Loading...
19235 93RD PL W.PDFiiiiii iiiiii 9071 19235 93RD PL W J AN Z 6 1993 EPTSIDE SEWER PERMIT CITY OF EDMONI)SLIC WORKS D PERMIT N -0 8 4 3 "o,qlfoh— -Tr FILE. - Address of Construction: I q?-SS7 93 V611 �L . we-st Property Legal Description (Include all easements): Owner and/or Contractor: 'Te 44' SfroW (011,4-5,t- State License No. TV �;E R C _70 P, Building Permit No. )(Single Family 0 Multi -Family (No. of Units-) 11 Commercial 0 Public S Ci *20 33 8 Invasion into City Right -of -Way: KNo 11 Yes RW Construction Permit No, Cross other Private Pr operty: KNo El Yes Attach legal description and copy of recorded easement I certifyhhi'Yave read and shall comply with all city requirements as indicated on the back of the Perm.it Card. -q 3 Date ! * CALL DIAL -A -DIG (1-800-424-5555) BEFORE ANY EXCAVATION * OFFICE',USE, ONLY" FOR INSPECTION CAJ-1 PUBLIC WORKS DEPT. Permit Fee: 17!1.o , sued By TrunkCharge: Date Issued: ,'Y -7 �ssessment Fee: �A�)Al ReceiptNo.: 7\,_WG15t\ Lid No.:- '1\5 / Partial Inspection: Date -Initial Commer Reason Rejected: Final Inspection Approved: Q/t&2_L-!q� Initial4f L Date -Initial 6� ** PERMITIMUST BE POSTED ON JOB SITE ** White Copy; File Green Copy. Inspector Buff Copy; Applicant Revised 3190 Side Sewer Drawing �k TL el: f r-A A a ly W 111WIN 3 EASEMENT NO - -------------------------------------------- NEW CONSTRUCTION 2-' REPAIRS Fj LID NO. ------- - AsmT. NO - -------- OWNER------------------------------------------------------------------------------------------------ CONTRACTOR ------------------------------------------------------------------------------------ PERMIT NO. R�3 --- Z. JOB ADDRESS 19 ... C�3-5 -- ---- q .... 1-3. ... 1.2.1-1-�., ....... P ... L ........... W ------------ LEGAL DESCRIPTION: LOT NO - -------------------------------------- BLOCK NO. NAMEOF ADDITION ----------------------------------------------------------------------------------------------------------------------- El PWW-0001-11/75 (REV.11/78) ON 'iso (t," P.%(.L C-P . SPD-o-c-y�. 0-0,p I I t C�- ? - q T>u. Approved: DATE ............... By,� .. ...... NOTICE:* -a No---w- 'a 'r.r a n The information shown on the attached map(s) was com ' piled for use by the City Of Edmonds., its Empl.oyees and Consultants. Th,.e City of �Edrn.onds does ' not * warrant the accuracy of anything set for.th on these M a p (S"). A n . y person or entity -requesting a should conduct an.independent COPY -o 1nfbrrn'at'on shown inquiry regarding the tF�� -map(s), including, but not i1mited to, th . e location of any sew-er stub shown. Suc sewer stubs may or may- not e.xlst and may or may not exist at the location shown. of Ed moin d. s. nor its Neitheir t1he -1 be 11 ab-'Fe for thE PA . em toyee-s 0-r off icers -shal is map(5), nor for infor . mation given on th' 'ded based any one representation provi upon . said map(s). f% ve �_� ?"""' ol nr.ET FILE CITY OF EDMONDS SIDE SEWER PERMIT '0 . , 9, , PERMIT N 0- 8432 Address of Construction: I gis S, 93 V6( �L. We -it Property Legal Description (Include all easements): �3711-0oa-ooi,,S -0(01� Owner and/or Contractor: 'Te -�Lc �trov, (OLt_�t. ME f _71)(Z State License No. , _- 4 C- )k I S - Building Permit No KSingle Family C3 Multi -Family (No. of Units 0 Commercial 0 Public S 01203-318 I . nvasion into City Right -of -Way: KNo C1 Yes RW Construction Permit No. Cross other Private Property: KNo El Yes Attach legal description and copy of recorded easement I cert4�A? iWave r'ea'd and shall comply with all city requirements as indicated on the back of the Permit Card. I --2G --q 3 Date * CALL DIAL -A -DIG (1-800-424-5555) BEFORE ANY EXCAVATION * OFFICE USE ONLY "'FOR INSPECTION PUBLIC WORKS DEPT. =11011 Permit Fee: 77442— y 20 Issued B Trunk Charge: C21�=5 - on Date Issued: Assessment Fee: Receipt No.:. Lid No.: Partial Inspection: Date —Initial — Comments Reason Rejected: Date —Initial Final Inspection Approved: Date —Initial— ** PERMIT MUST BE POSTED ON JOB SITE ** White Copy: File Green Copy: Inspector Buff Copy: Applicant Revised 3190 Revised 3/90 I SIDE SEWER PERMIT REQUIREMENTS 1. Side sewer permits'shali,be poste�d'at'job-si-te and �vailable to inspector at time of inspection. Inspection duHhg'normal working hours only. One (1) working day notice required. Side sewers must be left uncovered until inspected. A water test is required. 2. Property owners can obtain a permit to install side sewers on private property. Licensed side sewer contractors must be employed to construct side sewers in the City right-of-way. Invasion into City right-of-way requires a separate permit. 3. The side sewer contractor assumes full responsibility for each installation for one (1) year. 4. Trenches, within -City r.ight-of-way must be restore.d to original ..condj-t-ions. -Street restoration fee.s shall be paid in advance under a right-of-way permit. Contractors shall be responsible for ri g'ht-of -way, f ai 1 ure due to poor cbmp6tti 6n of f i 11 5. No down spouts, footing drains or floor drains can be connected to a side sewer system. 6. Pea gravel is required for bedding when installing sewer lines through other than granular soil. 7. Cleanouts at property line and at house will have risers installed to within 12" of surface grade with removable cap. 8. Commercial establishments require a minimum of six inch (6") side sewer line. Side sewers may not be installed closer than thirty i-nches (30")* to any structure. 10. Cleanouts are required at 30"-60" from each plumbing exit line and at minimum intervals of 100' along sewer line run. 11. Side sewer lines must be laid 0 at a minimum grade of 2% (1.15 0) and maximum grade of 100% (45 ). 12. No turn in side sewer gre -- 1 50 (1/8 bend) is allowed be Veen cleanout. All 90u -turns must be constructed of a 45 (1/8 bend) and wye with removable cap for cleanouts. 13. No cleanout shall be paved over. If located in pavement, cast iron lids will be installed. 14. All connections will be of gasketed type. No solvent joints unless prior approval is granted. 41� cl'a35- I- CITY COPY DETERMINATION OF NONSIGNIFICANCE Description of proposal New Single Family Residence "FIL AET FILE /A Proponent Robert Scott 3512 S.W. 310th Ct, Federal Wy, WA 98023 Location of proposal, including street address, if any 19235 93rd Pl. W. Edmonds, WA 98020 Lead Agency Edmonds Planning Division The lead agency for this proposal has determined that it does not have a probable significant adverse impact on the environment. An environmental impact statement (EIS) is not required under RCW 43.21C.030(2)(c). This decision was made after review of a completed environmental checklist and other information on file with the lead agency. This information is available to the public on request. X There is no comment period for this DNS. This DNS is issued under 197-11-340(2); the lead agency will not act on this proposal for 15 days from the date below. Comments must be submitted by Responsible Official - Jeffrey S. Wilson Position/Title Currenf Planning Supervisor Phone 771-3202 Address 250 5th Ave. N., Edmonds WA 98020 Date 1 1.6 1 1 'a- Signatu X You may appeal this determination of nonsignificance to Hearing Examiner at 250 5th Ave. North, Edmonds, WA 98020 no later than January 17, 1992 by filing a written appeal citing reasons. You should be prepared to make specific factual objections. Contact John Bissell to read or ask about the procedures for SEPA appeals. There is no agency appeal. Complete this checklist for nonproject proposals, even though questions may be answered "does not apply". IN ADDITION, complete the SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS (part D). For nonproject actions, the references in the checklist to the words "project," "applicant," and "property or site" should be read as "proposal," "proposer," and "affected geographic area." respectively. A. BACKGROUND 1. Name of proposed project, if applicable: 2. Name of applicant: MDOrt 41 ?2��4 6r..D# 3. Address and phone num�pr of applicant and contact person: "401-4 /2W ;�10-!`Ct)M- 4V,,Po�- q 4�:0;3;�7 6/)+, "Y) tkkwe '31S fo) 4. Date checklist prepared: 1?1)G I 11 5. Agency requesting checklist: Kbw� 4m4>S WA- % K 14 6. Proposed timing or schedule (including phasing, if applicable): 7. Do you have any plans for future additions, expansion, or further activity related to or connected with this proposal? If yes, explain. t , 4,0 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. JeA- irwic- tky) �1 �, - C- , enip. .� 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. 10. List any government approvals or permits that will be needed for your proposal, if known. 11. Give brief, complete description of your proposal, including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You'do not need to repeat those answers on this page. (Lead agencies may modify this form to include additional specific information on project description.) 12. Location of the proposal. Give sufficient information for a person to understand the precise location of your proposed project, including a street address, if any, and section, township, and range, if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. 6u b-n TO BE COMPLETED BY APPLICANT EVALUATION FOR AGENCY USE ONLY B. ENVIRONMENTAL ELEMENTS 1. Earth a. General descriptio;.91 he site (circle one): Flat, rolling, hilly, steep h4ir slopes, mountainous, r� 41� tz T b. What is the steepest slope on the site (approximate percent slope)? c. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If you know the classification of agricultural soils, specify them and note any prime farmland. 0&v� d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe. +4 o e. Describe the purpose, type, and approximate quantities of any filling or grading proposed. Indicate source of fill. 4-ulli-b— e-ut f. Could erosion occur as a result of clearing, cons truction, or use? If so, generally describe. ILI ob ct ;J g. About what percent of the site will be covered with imperv4s surfaces after project construction (for example, asphalt or buildings)? h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: 2. Air a. What types of emissions to the air would result from the proposal (i.e., dust, automobile. odors, industrial wood smoke) during construction and when the project is completed? If any, generally describe and give approximate quantities if known. b. Are there any off -site sources of emissions or odor that may'affect your proposal? If so, generally describe. c. Proposed measures to reduce or control emissions or other impacts to air, if any: 3. Water a. Surface: 1) Is there any surface water body on or in the immediate vicinity of the site (including year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. $�O 2) Will the project require any work over, in or adjacent to (within 200 feet) the described waters? If yes, please describe and attach available plans. 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. f�'D 4) Will the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quantities if known. 4t;"%A 5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan. 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and antic i pated 'vobjme of discharge. b. Ground: 1) Will ground water be withdrawn, or will water be discharged to ground water? Give general description, purpose, and approximate quantities if known. 2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any (for example: Domestic sewage; industrial, containing the following chemicals ... ; agricultural; etc.). Describe the general size of the system, the number of such systems, the number of houses to be served (if applicable), or the number of animals or humans the system(s) are expected to serve. kc� c. Water Runoff (including storm water): 1) Describe the source of runoff (including storm water) and method of collection and disposal, if any (include quantities, if known). Where will this water flow? Will this water flow into other waters? If so, describe. VA A)&—ft YUPP6 P" at/ qV). qntl 2) Could waste materials enter ground or surface waters? If so, generally describe. d. Proposed measures to reduce or control surface, ground, and runoff water impacts, if any: 4. Plants a. Check or circle types of vegetation found on the site: deciduous tree: alder, maple, aspen, other evergreen tree: fir, cedar, pine, other shrubs grass pasture crop or grain wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other water plants: water lily, eelgrass, milfoil, other other types of vegetation b. What kind and amount of vegetation will be removed or altered? Oul cA(I , t14 c. List threatened or endangered species known to be on or near the site. d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: "A L)J 0, 5. Animals a. Circle any birds and animals which have been observed on or near the site or are known to be on or near the sit er- birds: hawk, heron, eagle �ngbirds 0� mammals: deer, bear, elk e: er. fish: bass, salmon, troui, herring, shellfish', ;t,�;�: b. List any threatened or endangered species known to be on or near the site. 904G c. Is the site part of a migration route? If so, explain. d. Proposed measures to preserve or enhance wildlife, if any: k.)WE-.0 6. Energy and Natural Resources a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. b. Would your projec affecthe poten use of solar energy by adjacent properties? If so, generally describe. c. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: 7. Environmental Health a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so, describe. 401 1) Describe special emergency services that might be required. 4 1 r—.. 24_.- 2) Proposed measures to reduce or control environmental health hazards, if any: b. Noise 1) What types of noise exist in the area which may affect your project (for example: traffic, equipment, operation, other)? 2) What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis (for example: traffic, construction, operation, other)? Indicate what hours noise would come from the site. 6rn 4� to - Y) 3) Proposed measures to reduce or control noise impacts, if any: 8. Land and Shoreline Use a. What is the current use of the site and adjacent properties? b. Has the site been used for agriculture? If so, describe. )�CD c. Describe any structures on the site. �b96 d. Will any structures be demolished? If so, what? 40 e. What is the current comprehensive plan designation of the site? 94�p - I Z, . h. Has any part of the site been classified as an "environmentally sensitive" area? If so, specify. (Z�V.5- T-­:, __-� Tz----2-;i - �— Z�s A C o OCAAC-7T- t' go 15 J 67-c�'_ i. Approximately how many people would reside or work in the completed project? 1!�� j. Approximately how many people would the completed project displace? k. Proposed measures to avoid or reduce displacement impacts, if any: q1A* 1. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: A 1� 9. Housing a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low-income housing. b. Approximately how many units, if any, would be eliminated? Indicate whether high, middle, or low-income housing. c. Proposed measures to reduce or control housing impacts, if any: 10r.. Aesthetics a. What is the tallest height of any proposed structure(s), not including antennas; what is the principal exterior building material(s) proposed? �" I. -1Z V Ink, , 6"r I Lr'Q*L b. What views in the immediate vicinity would be altered or obstructed? c. Proposed measures to reduce or control aesthetic impacts, if any: 11. Light and Glare a. What type of light or glare will the proposal produce? What time of day would it mainly occur? b. Could light or glare from the finished project be a safety hazard or interfere with views? c. What existing off -site sources -of light or glare may affect your proposal? "*S d. Proposed measures to reduce or control light and glare impacts, if any: t4bilr__ I rtloo� 12. Recreation a. What designated and informal recreational opportunities are in the imediate vicinity? 41144E.- b. Would the proposed project displace any existing recreational uses? If so, describe. c. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any: 13. Historic and Cultural Preservation a. Are there any places or objects listed on, or proposed for, national, state, or local preservation registers known to be on or next to the site? If so, generally describe. C" b. Generally describe any landmarks or evidence of historic, archaeological, scientific, or cultural importance known to be on or next to the site. c.. Proposed measures to reduce or control impacts, if any: 14. Transportation a. Identify public streets and highways serving the site, and describe proposed access to the existing street system. Show on site plans, if any. rw �6,r t)�� b. Is site currently served by public transit? If not, what is the approximate distance to the nearest transit stop? c. How many parking spaces would the completed project have? How many would the project eliminate? te*�e— C) d. Will the proposal require any new roads or streets, or improvements to existing roads or streets, not including.driveways? If so, generally describe (indicate whether public or private). e. Will the project use (or occur in the immediate vicinity of) water, rail, or air transportation? If so, generally describe. f. How many vehicular trips per day would be generated by the completed project? If known, indicate when peak volumes would occur. g. Proposed measures to reduce or control transportation impacts, if any: 15. Public Services a. Would the project result in an increased need for public services (for example: fire protection, police protection, health care, schools, other)? If so, generally describe. 415) b. Proposed measures to reduce or control direct impacts on public services, if any. ,Q�* 16. Utilities rc 1 e u t i 1 c u r rfr1L4—AXa i I a b I e a t the s i te.Q e ci "natural qas,"� .Water jrgr� septic system, Oephone,)qrFTrary sew b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. C. SIGNATURE The above answers are true and complete to the best of my knowledge. I understand that the lead aqenV is relyin3gon trhn to make its decision. Signature: ..... . ............................... Date Submitte .. ..................... ............... D. Supplemental Sheet for Nonproject Actions (Rezones, Code Changes, Annexations, etc.) -- Do not use this sheet for project actions. Because these questions are very general, it may be helpful to read them in conjunction with the list of the elements of the environment. When answering these questions, be aware of the extent the proposal, or the types of activities likely to result from the proposal, would affect the item at a greater intensity or at a faster rate than if the proposal were not implemented. Respond briefly and in gen6ral terms. 1. How would the proposal be likely to increase discharge to water-�emissions to air; production, storage, or release of toxic or hazardous substa es; or production of noise? Proposed measures to avoid or reduce such increases are: I--% ev 2. How would the proposal be likely to affect plants, animals, fish, or marine life? % W-;�Jv) Proposed measures to protect or conserve plants, animals, fish, or marine life are: tw I v), 1,e) 3. How would the proposal be likely to deplete energy or natural resources? Proposed measures to protect or conserve energy and natural resources are: 6?Aek VOL 4. How would the proposal be likely to u se or I affect environmentally sensitive areas or areas designated (or eligible or under study) for governmental protection; such as parks, wilderness, wild and scenic rivers, threatened or endangered species habitat, historic or cultural sites, wetlands, floodplains, or prime farmlands? Proposed measures to protect such resources or to avoid or reduce impacts are: 5. How would the proposal./be likely to affect land and shoreline use, including whether it would allow or , encourage lang or shoreline uses incompatible with existing plans? / , Lr Proposed measur6s to avoid or reduce shoreline and land use impacts are: 6. How would the proposal be likely /increase demands on transportation or public services and utilities? Proposed measures to reduce/��r respond to such demand(s) are: 7. Identify, if possible, whether the proposal may conflict with local', state, or federal laws or req rements for the protection of the environment. ho cowl'(--L ENVCHK3/PFORMS 0 0 is STREET FILE Complete this checklist for nonproject proposals, even though questions may be answered "does not apply". IN ADDITION, complete the SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS (part 0). For nonproject actions, the references in the checklist to the words "project," "applicant," and "property or site" should be read as "proposal," "proposer," and "affected geographic area." respectively. A. BACKGROUND 1. Name of proposed project, if applicable: .�60A rz 2. Name of I applicant: 41 ?2060r� 6��0# 3. Address and phone numypr of applicant and contact person: 4i�P W--N1 4' q cz) 4. Date checklist prepared: 5. Agency requesting checklist: V,O� � 6. Proposed timing or schedule (including phasing, if applicable): 4 '� -b M A 1 e � C-t 5 1 t�� 4 7. Do you have any plans for future additions, expansion, or further activity related to or connected with this proposal? If yes, explain. 0 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. enie-rj� 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. 10. List any government approvals or permits that will be needed for your proposal, if known. 11. Give brief, complete description of your proposal, including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You*do not need to repeat those answers on this page. (Lead agencies may modify this form to include additional specific information on project description.) 12.. Location of the proposal. Give sufficient information for a person to understand the precise location of your proposed project, including a street address, if any, and section, township, and range, if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. TO BE COMPLETED BY APPLICANT EVALUATION FOR AGENCY USE ONLY B. ENVIRONMENTAL ELEMENTS 1. Earth a. General descriptiogf 1,,he site (circle one): Flat, rolling, hilly, steep hir slopes, mountainous, r b. What is the steepest slope on the site (approximate percent slope)? c. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If you know the classification of agricultural soils, specify them and note any prime farmland. IE I I 10 etmv� 4W1 , qnv�! � � d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe. �4 o e. Describe the purpose, type, and approximate quantities of any filling or grading proposed. Indicate source of fill. 1 f. Could erosion occur as a result of clearing.�construction, or use? If so, generally describe. k - - '— " . r. 4� g. About what percent of the site will be covered with impervioYs surfaces after project construction (for example, asphalt or buildings)? h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: 2. Air a. What types of emissions to the air would result from the proposal (i.e., dust, automobile, odors, industrial wood smoke) during construction and when the project is completed? If any, generally describe and give approximate quantities if known. b. Are there any off -site sources of emissions or odor that may affect your proposal? If so, generally describe. c. Proposed measures to reduce or control emissions or other impacts to air, if any: 3. Water a. Surface: 1) Is there any surface water body on or in the immediate vicinity of the site (including year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. $10 2) Will the project require any work over, in or adjacent to (within 200 feet) the described waters? If yes, please describe and attach available plans. gi!�> 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. 4 1 ID 4) Wili the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quantities if known. FU 5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan. 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anti ci pated 'vollume of discharge. b. Ground: 1) Will ground water be withdrawn, or will water be discharged to ground water? Give general description, purpose, and approximate quantities if known. A 2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any (for example: Domestic sewage; industrial, containing the following chemicals... ; agricultural; etc.). Describe the general size of the system, the number of such systems, the number of houses to be served (if applicable), or the number of animals or humans the system(s) are expected to serve. k:wa c. Water Runoff (including storm water): 1) Describe the source of runoff (including storm water) and method of collection and disposal, if any (include quantities, if known). Where will this water flow? Will this water flow into other waters? If so, describe. 4b-ft ruO6 P" at/ 44- lqtrAl.' &*M 4A 6p- A �tb *S' r9w4v 2) Could waste materials enter ground or surface waters? If so, generally describe. +4D d. Proposed measures to reduce or control surface. ground, and runoff water impacts, if any: 0 4. Plants a. Check or circle types of vegetation found on the site: deciduous tree: alder, maple, aspen, other evergreen tree: fir, cedar, pine, other shrubs grass pasture crop or grain wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other water plants: water lily, eelgrass, milfoil, other other types of vegetation b. What kind and amount of vegetation will be removed or altered? c. List threatened or endangered species known to be on or near the site. 40�� d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: )IUM 5. Animals a. Circle any birds and animals which have been observed on or near the site or are known to be on or near the si �er . ............................. birds: hawk, heron, eagle, �nAgbirds 0 mammals: deer, bear, elk, ;e er. fish: bass, salmon, trout, herring, shellfish:,o,*t*h��,:,:*::***::: ... b. List any threatened or endangered species known to be on or near the site. 4144L.-I c. Is the site part of a migration route? If so, explain. d. Proposed measures to preserve or enhance wildlife, if any: kDA& 6. Energy and Natural Resources a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. 4- 1 e Z — m Kalt - A �Ja 4 1 b. Would your roject a�ffecl the poten 'al use of solar energy by adjacent properties? If so, generally describe. I,- c. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: 7. Environmental Health a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so, describe. �40 1 1) Describe special emergency services that might be required. 2) Proposed measures to reduce or control environmental health hazards, if any: b. Noise 1) What types of noise exist in the area which may affect your project (for example: traffic, equipment, operation, other)? 2) What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis (for example: traffic, construction, operation, other)? Indicate what hours noise would come from the site. ry) LO, 14 3) Proposed measures to reduce or control noise impacts, if any: 0 �"tl�_ 8. Land and Shoreline Use a. What is the current use of the site and adjacent properties? b. Has the site been used for agriculture? If so, describe. )�O * c. Describe any structures on the site. d. Will any structures be demolished? If so, what? 40 e. What is the current comprehensive plan designation of the site? h. Has any part of the site been classified as an "environmentally sensitive" area? If so, speci i. Approximately how many people would reside or work in the completed project? Z!�_, j. Approximately how many people would the completed project displace? k. Proposed measures to avoid or reduce displacement impacts, if any: 1. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: .-'A I Y wnty wre� 9. Housing a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low-income housing. d >he, kll� IV')U- Vy�_e Ohl t b. Approximately how many units, if any, would be eliminated? Indicate whether high, middle, or low-income housing. c. Proposed measures to reduce or control housing impacts, if any: 1G.. Aesthetics a. What is the tallest height of any proposed structure(s), not including antennas; what is the principal exterior building material(s) proposed? mok, , 6" P- '�i*4) i 'A--f t'- 14 �-Oo/ b. What views in the immediate vicinity would be altered or obstructed? 4�1_ c. Proposed measures to reduce or control aesthetic impacts, if any: **iel 11. Light and Glare a. What type of light or glare will the proposal produce? What time of day would it mainly occur? b. Could light or glare from the finished project be a safety hazard or interfere with views? 4 c. What existing off -site sources -of light or glare may affect your proposal? d. Proposed measures to reduce or control light and glare impacts, if any: t4b klr-- I M.01 12. Recreation a. What designated and informal recreational opportunities are in the immediate vicinity? b. Would the proposed project displace any existing recreational uses? If so, describe. 4_0 c. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any: 13. Historic and Cultural Preservation a. Are there any places or objects listed on, or proposed for, national, state, or local preservation registers known to be on or next to the site? If so, generally describe. b. Generally describe any landmarks or evidence of historic, archaeological, scientific, or cultural importance known to be on or next to the site. c.. Proposed measures to reduce or control impacts, if any: 14. Transportation a. Identify public streets and highways serving the site, and describe proposed access to the existing street system. Show on site plans, if any. he �A b. Is site currently served by public transit? If not, what is the approximate distance to the nearest transit stop? c. How many parking spaces would the completed project have? How many would the project eliminate? pciv— e) d. Will the proposal require any new roads or streets, or improvements to existing roads or streets, not including.driveways? If so, generally describe (indicate whether public or private). e. Will the project use (or occur in the immediate vicinity of) water, rail, or air transportation? If so, generally describe. f. How many vehicular trips per day would be generated by the completed project? If known, indicate when peak volumes would occur. 0 vv-� ' 'k �Our-�' g. Proposed measures to reduce or control transportation impacts, if any: NbN6 15. Public Services a. Would the project result in an increased need for public services (for example: fire protection, police protection, health care, schools, other)? If so, generally describe. NO b. Proposed measures to reduce or control direct impacts on public services, if any. 16. Utilities -A—�Orcle util' J,gs curreqJJy.Ayailable at the site<27-19�z�r�ice' natural ;q serv- v-1-el ephon�'�.�Mry �sew septi c system, "ofizr.--, b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. C. SIGNATURE The above answers are true and complete to the best of my knowledge. I understand that the lead aqeng is relying on thW to make its decision. Signature: ..... ............................... Date Submitte .. ..................... �y .1 �. 1.1 ............... D. Supplemental Sheet for Nonproject Actions (Rezones, Code Changes, Annexations, etc.) -- Do not use this sheet for project actions. Because these questions are very general, it may be helpful to read them in conjunction with the list of the elements of the environment. When answering these questions, be aware of the extent the proposal, or the types of activities likely to result from the proposal, would affect the item at a greater intensity or at a faster rate than if the proposal were not implemented. Respond briefly and in genL-ral terms. 1. How would the proposal be likely to increase discharge to water-�emissions to air; production, storage, or rele.ase of toxic or hazardous substa es; or production of noise? IV) Y).�Anb Proposed measures to avoid or reduce such increases are: 2. How would the proposal be likely to affect plants, animals, fish, or marine life? Proposed measures to protect or conserve plants, animals, fish, or marine life are: 3. How would the proposal be likely to deplete energy or natural resources? Proposed measures to protect or conserve energy and natural resources are: I r-J uw 4. How would the proposal be likely to use or affect environmentally sensitive areas or areas designated (or eligible or under study) for governmental protection; such as parks, wilderness, wild and scenic'rivers, threatened or endangered species habitat, historic or cultural sites,-' wetlands, floodplains, or prime farmlands? Proposed measures to protect such resources or to avoid or reduce impacts are: I 5. How would the proposal /be likely to affect land and shoreline use, including whether it would allow or' encourage lanA or shoreline uses incompatible with existing plans? -)qz 70 Proposed measu s to avoid or reduce shoreline and land use impacts are: 6. How would the proposal be likely dincrease demands on transportation or public services and utilities? Proposed measures to reduce/6 respond to such demand(s) are: F,� 7. Identify, if possib"i whether the proposal may conflict with local', state, or federal laws or reqWrements for the protection of the environment. ho 641 ENVCHK3/PFORMS 0 0 z o oAti A - Li. IAI STREET Fl LE CITY OF EDMONDS OFFICIAL TRUCK ROUTES 7 1. Z,3 Nil ,AiCI,. I I , �' 3 MEADOWDALE Cie_ A-11 . ..... .. I. . . . . . . . . . . . CVUNTY A!", ob —J-lJ L Y N N IN 0 0 D NEWT$ ELIM 100 If Is Je -.-.17 dib 20 �TO L"AlW000 -7 S I-iw p— cl CITY CAC. U-1 ED.AROS Is POINT C.- ...TG c... ILl. 2r I W 0 0 0 W A Y . LAKS M 0 U N T L A K E T E R R A C E If STORM DRAINAGE REPORT LOT 5 ADMIRALTY VIEW 192nd ST. SW & 93rd PL. SW for THE SCOTT RESIDENCE prepared by John W. Mellor, P.E. .9/ / 9/-Fz '�� '22 6T RECEIVED MAR 2 7 1992 PERMIT COUNTER M61=111111W.111LI -I - -4 191 M11 11 WINT, TV I Lei a For this proposed project consisting of the construction of a single family residence storm drainage will be controlled using the infiltration trench ("dry well")system. This alternative type of storm drainage disposal requires on -site perc tests. These required tests were performed in five different locations on the site including the locations of the infiltration trench sites. Perc test results are shown in Figure A, attached to this report. The holes established for the five individual perc tests indicated similar soils in these locations and apparently over a majority of the site(re * fer to the perc test map attached to this report). In accordance with the SCS Soils Maps for Snohomish County the soils encountered are the Alderwood - Urban Land Complex, 8 - 15 % slopes. They are a gravelly sandy loam with a dark brown color in the top 6 inches of the hole underlain by a gravelly sandy loam of yellowish brown color. In all holes the soils were nearly identical in texture and color variations, and consistant to a depth of 36 inches. See attached SCS soils survey data. A ge6technical investigation was done by,James Eaton, P.E. of Geotechnical Services, Box 126, Hobart, Wa. 98025. A copy of this report is included herewith. The report basically concludes that disposal of storm drainage through means of infiltration is reasonable for the subject site and will not have adverse affects on the slope or on neighboring property. Existing Conditions Total area of subject site 111' x (225.66' + 46) - 3.1416 x (4510-s x (50,846) 2 360 15,021.63 - 898.52 = 14,123.11 sq. ft. A = 14,123.11 = 0.324 ac 43,560 C = 0.20 I = 1.80 in/hr where T. 10 + 92' where S = L6 = 0.17 1. 1 x6O 92 V = 1.1 fps 10 + 1.39 = 11.39 Estimated Existing Runoff Q = CIA = 0.20 x 1.80 x 0.324 = 0.117 cfs Required Detention Proposed impervious surfaces including roofs, driveways, sidewalks, & decks 5666 sq. ft. = 0. 130 acres 43560 sq.ft. Pervious surfaces: 14123.11 - 5666.00 = 8457.11 = 0. 194 acres 43560 43560 C(value for developed lot) = F0,20 x 0,1941 + f0,90 x 0,131 0.324 Q = 0.117 cfs 00 0,117 =0.748 0.481 x 0.324 T = -25 + 2706 V 00 25 + 2706 V 0.748 = -25 + 55.3 = 30.3 = 0.481 Vs = 4329 T + 40 Q. T T + 25 = 2529.75 - 1051.69 = 1478 VT= Vs x C x A = 1478 x 0.481 x 0.324 = 230.3 cu. ft. 2 Sizing trench lengths The square footage of roof and driveway contributing runoff is the sum of: 1025 + 1237 + 300 + 392 + 630 + 700 + 1382 = 5666 square feet, refer to the enclosed site plan. The required trench length in accordance with Table 1 - Infiltration Trench Length - City of Edmonds and the average perc rate of this location of 3.7 min/inch is 24ft of trench per 1000 sq. ft. of impermeable surface, 5666 sq. ft. x 24 ft trench/1000 sq. ft. imperv. surfaces = 135.9 ft. of trench with a bottom width of 2. If a trench with a bottom width of 4' is used it would shorten the required length of trench to: 135.9' x 2' + (1' + 1' for each side) = 135.9' x 4' = 90.6' of trench, 4' bottom 4' + (1' + 1' for each side) 61 To assure the required detention volume is available in the trench, the trench will be filled with a material with void ratio of 0.30, a commonly used value. The required detention volume 205 cu. ft. must be available in the voids within the gravel in the trench. The 90.6 trench if 2 feet deep and 2 feet wide will contain: 90.6 x 2 x 2 x 0.3 = 108.7 cu. ft. of detention volume < 230.3 cu. ft. A trench 4 feet wide, if lengthened to 96', would contain: 96 x 2 x 4 x 0.3 = 230.4 cu. ft. of detention volume > 230.3 cu. ft. Trenches 4 feet wide and 96 feet in total length will be used for infiltration, and storage. 12 feet of the total 96 feet will be designed as runoff spreader outlet trench. Refer to the attached map. All trenches will use 3/4" x 1 1/2" washed gravel, will be 2 feet in depth and 4 feet in width. Total gravel required will be 768 cu. ft. Filter fabric will be used to enclose the washed gravel placed in the above trenches. The perforated pipe will be 4" in diameter. 3 RUNOFF FACTORS FOR STORM SEWERS (Values of "C" in.0 CIA) FLAT ROLLING .0-5% 5% UNDEVELOPED LAND Wood & Forest.......,,,,., .... ...... 0.10 0.15 Sparse Trees & Ground Cover ................... 0.15 0.20 Light Grass to Bare Ground .................... 0.20 DEVELOPED AREA Pavement & Roofs... 0.90 0.90 Gravel Roads &.Parking Lots...',,, . 0*0000*00*0** 0.75 0.80 City Business.... OAS 0.90 Apartment Dwelling Areas' 0080 0 . .85 Industrial Areas 0.70 0.80 Industrial Areas (Light)., .......... 0.60 0.70' Earth Shoulder ......... 0*50 0.50 Playground ............ 0.25 0.30 Lawns, Meadows & Pastures ............. o ........ 0.20 0.25 Parks & Cemeteries ..... 0.15 0.20 SINGLE FAMILY RESIDENTIAL (Dwelling Unit/Gro'ss' A6re)- 1.0 - 1.5 DU/GA.-...0000 0.30 1.5 - 3.0 DU/G . A ...... 0*35 3.0 - 3o5 DU/GA .... 0.40 3.5 - 4.0 DU/GA .... 0000..* ... 0*..9 0.45 4.0 - 6.0 DU/GA ......... o ...... o ...... o ....... 00 0.50 6.0 - 9.0 DU/GA.o ... o ... o ...... ***o9*000**:oo*oe Oo6O 9oO - 15.0 f)U/GA....00..o.,000000000000000000000000 Oo7O 18 This figure may be used to help estimate overland flow times for surface flow. TRAVEL TIME FOR OVERLAND FLOW 16 001 cxv 02 ev. o-,OP% L�A moo.. -0 mom MENEM MENNEN I %kik NONE 0 mom Emlk'klm mom No moon mommommom mmmalm ON mommommom No mom momms mommom NONE mommom smoom S V-A Ah %"I tr J1 m WASHINGTON . WASHINGTON STATE DEPARTMENT OF NATURAL RESOURCES WASHINGTON STATE UNIVERSITY AGRICULTURE RESEARCH CENTEi SYMBOL 4 5 6 7 9 10 12 13 14 15 16 7 118 19 20 21 22- 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 so 51 62 53 54 55. 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 so at 82 SOIL LEGEND NAME Aldo-,oW gravelly Sandy losm. 2 to 8 percent slopes Ajder*ood gravelly sandy 108M. 8 to 16 percent slopes AJd0rwO0dQr&vellY sandy loam 15 to 26percent slopes Aldervwood- Everett gravelly "Y looms. 25 to 70 percent slopes AlderviiOOC�Urban landcomplax. 2 108 percent slopes Bellingham silty'ilay loarn Bellingham Variant mucky silty clay loam Cathcart loam. 3 to 16 percent slopes Cathcart loam, 16 10 25 percent slopes Cathcart loam. 25 to 60 percent slopes CrVohemists. nearly level Custer fine sandy loam EJvwll silt loam, 3 to 30 Percent slopes Elvvill-0ioniount complex. is to 30 Percent slopes ElvAll-010MOunt-Rock Outcrop complex, 30 tO-60 percent slopes Everett gravelly sandy loam, 0 to 8 Percent slopes Ever@" gravelly sandy loam. a to 15 percent slopes Everett gravelly sandy loam. IS to 26 percent slopes Fluvaquents. tidal Getchelf silt loam. 3 to 30percentslom Getchall-6so complex, 15 to 30 percent slopes Getchell-Ozo-Rock Outcrop complex. 30 to 65 Percent slopes Gnionvater loamy send Marini t-Patchub-Rock Outcrop complex. 65 to go Percent slopes Indianola loamy sand. IS to 25 Percent slopes KitsaP silt loam 0 to 8 percent slopes Kitsap silt loam. 8 to 25 percent slopes Kitsap silt loam. 25 to 50 percent slopes LVnnv.eW loamy -sand, 0 to 3 percent slopes LyrinvAxid-Nargar COMP18x. 66 to 90 Percent slopes AkKanna gravelly silt loam, 0 10 8 percent slopes Menzel silt loam. 0 to 3 percent slopes Mukiltoo muck Nargar fine sandy loam, 0 to IS Percent slopes NSrgar fine sandy loam. 15 to 30 percent slopes Nafgar&Lynnv400d complex, 30 to 65 percent slopes Natuar Variant sandy loam. 3 to 30 percent slopes Norma loam Norms Variant loam 09-tv-Tokul-Rock Outcrop complex. 65 to 90 Percent slopes Olornount gravelly loam, 3 to 15 percent slopes Oloniount-Elvoell-Rock outcrop complex. 65 10 90 Percent slopes Orcas peat 0$0 grwolly loam, 3 to 16 Percent slopes i I Oso-Gstchall-Rock Outcrop complex. 65 to 90 percent slopes Pastik silt loam. 0 90 8 Percent slopes Pastik sift loarm 8 to 26 parcantslopes Pastik silt loam, 25 to 50 Percent slopes Pilchuck loanry sand Pits Potchub silt loam. 3 to 30 percent slopes Potchub-Harinit complex. 15 to 30 Percent slopet Potchub-Martnit-Rock Outcrop complex. 30 to 65 Percent slopes Puget silty clay loam Puyallup fine sandy loam Ragnar fine sandy loam. 0 10 8 Percent slopes R89nar fine sandy loam. 8 to IS percent slopes RivervAsh Rober silt loam. 0 to 16 percent slopes Robot sift loam. 15 to 30 percent slopes Robot silt loam. 30 to 65 percent slopes Skykomish gravelly loam. 0,10 30 Percent slopes Snohomish silt loam Suluw&f gravelly loam, 0 to 8 percent slopes Sultan silt loam Sultan Variant silt loam Sumastiltioam ' Torric Modisaptists. nearly level Tokul silt loam, 2 to 8 percent slopes Takul silt loam. a 10 15 percent slopes Tokul gravelly loam. 0 to 8 Percent slopes Tokul gravelly loam. a to 15 Percent slopes Tokul gravelly loam. 16 to 25 percent slopes Tokul-Oww-iV-Rock outcrop complex. 9 to 25 percent slopes Tokul-OpM-Rock Outcrop complex. 26 to 65 percent slopes Tokul-Winston gravelly foams. 25 to 65 percent slopes Urtionland Varlat mucky silt loam. 3 to 25 percent slopes Winston gravelly loam, 0 to 3 percent slopes Winston gravelly loam, 3 to 30 percent slopes Xerorthents. nearly level Snohomish County Area, Washington I I supplemental irTigation is also needed. Fertilizer is needed for optimum growth of grasses and legumes. The main limitations for homesites and septic tank absorption fields are the depth to the weakly cemented hardpan and wetness because of the seasonal high water table. Effluent from absorption fields flows laterally above the hardpan and may seep at the bottom of slopes. Drainage is needed if buildings with basements and crawl spaces are constructed. During construction, disturbed areas need to be seeded and runoff controlled to protect the soil from erosion. Temporary sediment basins can be used in construction areas to reduce the amount of sediment in runoff water. This map unit is in capability subclass lVe. 3—Alderwood gravelly sandy loam, 15 to 25 percent slopes. This moderately well drained soil is on till plains. It is moderately deep over a hardpan. The soil formed in glacial till. Areas -are long and narrow, are oriented in a northwest to southeast direction, and are 20 to 100 acres in size. The native vegetation is mainly conifers and hardwoods. Elevation is 50 to 550 feet. The average annual precipitation is about 40 inches, the averiage annual air temperature is about 50 degrees F, and the average frost -free season is 170 to 190 days. Typically, the surface layer is very dark grayish brown gravelly sandy loam about 7 inches thick. The upper part of the subsoil is dark yellowish brown and dark brown very gravelly sandy loam about 23 inches thick. The lower part is olive brown very gravelly sandy loam about 5 inches thick. A weakly cemented hardpan is at a depth of about 35 inches. Depth to the hardpan ranges from 20 to 40 inches. Included in 1his unit are small areas of soils that are similar to this Alderwood soil'but have cobbles or stones on the surface. Also included are small areas of Everett, Indianola, and Ragnar soils on terraces and eskers. Included areas make up about 15 percent of the total acreage. Permeability of this Alderwood soil is moderately rapid above the hardpan and very slow through it. Available water capacity is low. Effective roofing depth is 20 to 40 inches. Runoff is medium, and the hazard of water erosion is moderate. A seasonal perched water table is at a depth of 18 to 36 inches from January to March. This unit is used as wo6d[and and for urban development Douglas -fir is the main woodland species on this unit On the basis of a 100-year site curve, the mean site index is 142. On the basis of a 50-year site curve, the mean'site index is 108. The mean annual increment at culmination (CMAI) for Douglas -fir at age 65 is 148 cubic feet per acre. Among the trees of limited extent are western redcedar, western hemlock, and red alder. Among the common forest understory plants are salal, evergreen huckleberry, Oregon -grape, brackenfern, and western swordfem. This unit is well suited to year-round logging. Logging roads require suitable surfacing for year-round use. Rock for road construction is not readily available on this unit. Reforestation can be accomplished by planting Douglas -fir seedlings. If seed trees are present, natural reforestation of cutover areas by red alder occurs penodically. When openings are made in the canopy, Invading brushy plants, H not controlled, can prevent the establishment of seedlings. Because the rooting depth is restricted by a cemented pan, trees are subject to windthrow. The main limitations for homesites and septic tank absorption fields are the steepness of slope, depth to the weakly cemented hardpan, and wetness because of the seasonal perched water table. Effluent from absorption fields flows laterally above the pan and can seep at the bottom of slopes. Drainage is needed if buildings with basements and crawl spaces are constructed. During construction, disturbed areas need to be seeded and runoff controlled to protect the soil from erosion. Temporary sediment basins'can be used to reduce the amount of sediment in the runoff water. The topsoil needs to be stockpiled during excavation and subsequently used to cover the exposed material. A site preparation system that controls runoff and maintains the esthetic val6e of the site is needed. This map unit is in capability subclass lVe. 4—Aiderwood-Everett gravelly sandy loams, 25 to 70 percent slopes. This map unit is on till plains, terraces, and outwash plains. Areas are 30 to 160 acres in size. The native vegetation is mainly conifers and hardwoods. Elevation is near sea level to 550 feet The average annual precipitation is about 40 inches, the average annual air temperature is about 50 degrees F, and the average frost -free season is 170 to 190 days. This unit is about 60 percent Alderwood gravelly sandy loam and about 25 percent Everett gravelly sandy loam. The components of this unit are so intricately intermingled that it was not practical to map them separately at the scale used. Included in this unit are small areas of Ragnar, Indianola, McKenna, and Norma `ioils and Tem'c Medisaprists in depressional areas and drainageways; on plains. Also included are colluvial soils, slump areas, and escarpments. Included areas make up about 15 percent of the total acreage. The Alderwood soil is moderately deep over a hardpan and is moderately well drained. It formed in glacial fill. Typically, the surface layer is very dark grayish brown gravelly sandy loam about 7 inches thick. The ' upper part of the subsoil is dark yellowish brown and dark 4rown very gravelly sandy loam about 23 inches thick. The lower part is olive brown very gravelly sandy loam about 5 inches thick. A weakly cemented hardpan is at a depth of about 35 inches. Depth to the hardpan ranges from - 20 to 40 inches. Permeability of Ahe Alddrwo6d soil is rrioderately rapid above the hardpan and very slow through it. Available Snohomish County Area, Washington 11 supplemental irrigation is also needed. Fertilizer is needed for optimum growth of grasses and legumes. The main limitations for homesites and septic tank absorption fields are the depth to the weakly cemented hardpan and wetness because of the seasonal high water table. Effluent from absorption fields flows laterally above the hardpan and may seep at the bottom of slopes. Drainage is needed R buildings with basements and crawl spaces are constructed. During construction, disturbed areas need to be seeded and runoff controlled to protect the soil from erosion. Temporary sediment basins can be used in construction areas to reduce the amount of sediment in runoff water. This map unit is in capability subclass lVe. 3—Alderwood gravelly sandy loam, 15 to 25 percent slopes. This moderately well drained soil is on till plains. It is moderately deep over a hardpan. The soil formed in glacial till. Areas are long and narrow, are oriented in a northwest to southeast direction, and are 20 to 100 acres in size. The native vegetation is mainly conifers and hardwoods. Elevation is 50 to 550 feet. The average annual precipitation is about 40 inches, the avegige annual air temperature is about 50 deg�ees. F, and the average frost -free season is 170 to 190 days. Typically, the surface layer is very dark grayish brown gravelly sandy loam about 7 inches thick. The upper part of the subsoil is dark yellowish brown and dark brown very gravelly sandy loam about 23 inches thick. The lower part is olive brown very gravelly sandy loam about 5 inches thick. A weakly cemented hardpan is at a depth of about 35 inches. Depth to the hardpan ranges from 20 to 40 inches. * Included in 11his unit are small areas of soils that are similar to this Alderwood soil'but have cobbles or stones on the surface. Also included are small areas of Everett, Indianola, and Ragnar soils on terraces and eskers. Included areas make up about 15 percent of the total acreage. Permeability of this Alderwood soil is moderately rapid above the hardpan and very slow through it. Available water capacity is low. Effective roofing depth is 20 to 40 inches. Runoff is medium, and the hazard of water erosion is moderate. A seasonal perched water table is at a depth of 18 to 36 inches from January to March. This unit is used as wo�dland and for urban development. Douglas -fir is the main woodland species on this uniL On the basis of a 100-year site curve, the mean site index is 142. On the basis of a 50-year site curve, the mean* site index is 108. The mean a I nnual Increment at culmination (CMAQ for Douglas -fir at age 65 is 148 cubic feet per acre. Among the trees of limited extent are western redcedar, western hemlock, and red alder. Among the common forest understory plants are salal, evergreen huckleberry, Oregon -grape, brackenfern, and western swordfern. This unit is well suited to year-round logging. Logging roads require suitable surfacing for year-round use. Rock for road construction is not readily available on this unit. Reforestation can be accomplished by planting Douglas -fir seedlings. If seed trees are present, natural reforestation of cutover areas by red alder occurs pedodically. When openings are made in the canopy, Invading brushy plants, if not controlled, can prevent the establishment of seedlings. Because the rooting depth is restricted by a cemented pan, trees are subject to windthrow. The main limitations for homesites and septic tank absorption fields are the steepness of slope, depth to the weakly cemented hardpan, and wetness because of the seasonal perched water table. Effluent from absorption fields flows laterally above the pan and can seep at the bottom of slopes. Drainage is needed if buildings with basements and crawl spaces are constructed. During construction, disturbed areas need to be seeded and runoff controlled to protect the soil from erosion. Temporary sediment basins can be used to reduce the amount of sediment in the runoff water. The topsoil needs to be stockpiled during excavation and subsequently used to cover the exposed matehal. A sfte preparation syst.enn that controls runoff and maintains the esthetic value of the site is needed. This map unit is in capability subclass lVe. 4—Alderwood-Everett gravelly sandy foams, 25 to 70 percent slopes. This map unit is on till plains, terraces, and outwash plains. Areas are 30 to 160 acres in size. The native vegetation is mainly conifers and hardwoods. Elevation is near sea level to 550 feet The average annual precipitation is about 40 inches, the average annual air temperature is about 50 degrees F, and the average frost -free season is 170 to 190 days. This unit is about 60 percent Alderwood gravelly sandy loam and about 25 percent Everett gravelly sandy loam. The components of this unit are so intricately intermingled that it was not practical to map them separately at the scale used. Included in this unit are small areas of Ragnar Indianola, McKenna, and Norma "S''Oils and Tem'c Medisapdsts in depressional areas and drainageways on plains. Also included are colluvial soils, slump areas, and escarpments. Included areas make up about 15 percent of the total acreage. The Alderwood soil is moderately deep over a hardpan and is moderately well drained. It formed in glacial Ull. Typically, the surface layer is very dark grayish brown gravelly sandy loam about 7 inches thick. The upper part of the subsoil is dark yellowish brown and dark 4rown very gravelly sandy loam about 23 inches thick. The lower part is olive brown very gravelly sandy loam about 5 inches thick. A weakly cemented hardpan is at a depth of about 35 inches. Depth to the hardpan ranges from - 20 to 40 inches. Permeability of'the Alddrwo6d soil is moderately rapid above the hardpan and very slow through it. Available 12 water capacity is low. Effective rooting depth is 20 to 40 inches. Runoff is rapid, and the hazard of water erosion is high. A seasonal perched water table is at a depth of 18 to 36 inches from January to March. Springs or seep areas are common. The Everett soil is very deep and somewhat excessively drained. It formed in glacial outwash. Typically, the surface layer, where mixed to a depth of about 6 inches, is very dark grayish brown gravelly sandy loam. The subsoil is dark brown very gravelly sandy loam about 12 inches thick. The upper part of the substratum is brown very gravelly loamy sand about 5 inches thick. The lower part to a depth of 60 inches or more is dark brown extremely gravelly sand. Permeability of the Everett soil is rapid. Available water capacity is low. Eff ecbve roofing depth is 60 inches or more. Runoff is rapid, and the hazard of water erosion.is moderate. This unit is used mainly as woodland and for wildlife habitat It is also used for urban development. Douglas -fir is the main woodland species on the Alderwood soil. On the basis of a 100-year site curve, the mean site index is 142. On the basis of a 50-year site curve, the mean site index is 108. The mean annual increment at culmination (CMAI) for Douglas -fir at age 65 is 146 cubic feet per acre. Douglas -fir is the main woodland species on the Everett soil. On the basis of a 100-year site curve, the mean site index is 141. On the basis of a 50-year site curve, the mean site index is 111. The mean annual increment at culminabon (CMAI) for Douglas -fir at age 65 is 146 cubic feet per acre. Among the trees of limited extent on this unit are western hemlock, western redcedar, and red alder. Among the common forest understory plants are salal, evergreen huckleberry, brackenfern, red huckleberry, common rose, and Oregon -grape. The main limitation for the harvesfing of Umber is steepness of slope. Slope restricts the use of wheeled and tracked equipment in skidding operafions; cable yarding systems generally are safer and disturb the soils less. Harvesfing systems that lift logs entirely off the ground reduce the disturbance of the protecUve layer of duff. Logging roads require suitable surfacing lor year-round use. Rock for road construct.ion is not readily available on this unit. Establishing plant cover on steep road cut and fill slopes reduces erosion. Steep yarding paths, skid trails, and firebreaks are subject to rilling and gullying unless adequate water bars are provided or they are protected by plant cover. Seedling mortality is the main limitafian for the production of Umber. Reforestabon can be accomplished by planting Douglas -fir seedlings. If seed trees are present, natural reforestafion of cutover areas by red alder occurs periodically. The high temperature and low moisture content of the Everett soil during the growing season cause high mortality of seedlings, especially Soil survey those on south- and southwest -facing slopes. When openings are made in the canopy, invading brushy plants, if not controlled, can delay the establishment of seedlings. Because the roofing depth is restricted by a cemented pan in the Alderwood soil, trees are subject to windthrow. The main limitations of the Alderwood soil for septic tank absorption fields and homesites are steepness of slope and a seasonal perched water table. Effluent from absorpfion fields flows laterally above the pan and can seep at the bottom of slopes. Drainage is needed if buildings with base ' ments and crawl spaces are constructed. This soil sloughs readily when saturated. Tbe. main limitations of the Everett soil for septic tank absorption fields are steepness of slope and seepage. If the density of housing is moderate to high, community sewage systems are needed to prevent contaminabon of water supplies as a result of seepage from onsite sewage disposal systems. Road cuts tend io slough readily. To protect the soils in this unit fromerosion during construction, disturbed areas need to be seeded and runoff should be controlled. - This map unit is in capability subclass VIIe. 5—Aiderwood-Urban land complex, 2 to 8 percent slopes. This map unit is on fill plains. Areas are irregular in shape and are 100 to 1,000 acres in size. The native vegetation is mainly conifers. Elevafion is 50 to 550 feet The average annual precipitation is about 40 inches, the average annual air temperature is about 50 degrees F, and the average frost -free season is 170 to 190 days. This unit is about §g_pg[c9qtAIde po g�Ayelly sandy . T�V !qgm-and. abg.k!iLgf�.p@�q�p!.Qro�qn,.Iand� The components of this unit are so intricately intermi�61ed that it was not practical to map them separately at the scale used. Included in this unit are small areas of McKenna and Norma soils and Terric Medisaprists in depressional areas and drainageways on plains. Also included are small areas of soils that are very shallow over a hardpan; small areas of Everett Indianola, and Ragnar soils on terraces and outwash plains; and soils that have a stony and bouldery surface layer. Included areas make up about 15 percent of the total acreage. The Ald'erwood soil is moderately deep over a hardpan and is moderately well drained. It formed in glacial fill. Typically, the surface layer is very dark grayish brown. gravelly sandy loam about 7 inches thick. The upper part of the ' subsoil is dark yellowish brown and dark brown very gravelly sandy loam about 23 inches thick. -The lower part is olive brown very gravelly sandy loam about 5 inches thick. A weakly cemented hardpan is at a depth of about 35 inches. Depth to the hardpan ranges from 20 to 40 inches. Permeability of the Alderwood soil is moderately rapid above the hardpan and very slow through it Available water capacity is low. Effective roofing depth is 20 to'40 inches. Runoff is slow, and the hazard of water erosion Snohomish County Area, Washington 13 is slight. A seasonal perched water table Is at a depth of 18 to 36 inches from January to March. Urban land is areas that are covered by streets, buildings, parking lots, and other structures that obscure or alter the soils so that identification is not possible. The Alderwood soil in this unit is used mainly for parks, building sites, lawns, gardens, and woodland. The main limitations of the Alderwood soil for homesites and septic tank absorption fields are the depth to the hardpan and the seasonal perched water table. Onsite waste disposal systems often fail or do not function property during periods of high rainfall. Drainage is needed if buildings with basements and crawl spaces are constructed. Topsoil needs to be stockpiled during site preparation and subsequently used to cover the exposed material. Additions of fertilizer and peat are desirable prior to seeding grass for lawns. This map unit is in capability subclass lVe. 6—AldeOwood-Urban- land: comp'le . x, . 810-45 percent slopes. This map unit is on till plains. Areas am irregular in shape and are 25 to 100 acres in size. The native vegetation is mainly conifers and hardwoods. Elevation is 50 to 550 feet The average annual precipitation is about 40 inches, the average annual air temperature is about 50 degrees F, and the average frost -free season Is 170 to 190 days. This unit is about 60 percent Alderwood-gray.elly sandy loam.and about 25 percent. Urban, ]a_n_d"._, the comp6-66fit'C 6f this unit are so intricately interningled that it was not practical to map them separately at the scale used. Included in this unit are small areas of Everett and Indianola soils on terraces and outwash plains, Kitsap soils on terraces and terrace escarpments, and Ragnar soils on odtwash plains. I ' ncluded areas make up about t5 percent of the total acreage. The Alderwood soil is moderately deep and moderately well. drained. It formed in glacial till. Typically, the surface layer is very dark grayish brown gravelly sandy loam about 7 inches thick. The upper part of the subsoil is dark yellowish brown and dark brown very gravelly sandy loam about 23 inches thick. The lower part is olive brown very gravelly sandy loam about 5 inches thick. A weakly cemented hardpan is at a depth of about 35 inches. Depth to the hardpan ranges from 20 to 40 inches. Permeability of the Alderwood soil is moderately rapid above the hardpan and very slow through it. Available water capacity is low. Effective roofing depth is 20 to 40 inches. Runoff is slow, and the hazard of water erosion is slight. A seasonal perched water table is at a depth of 18 to 36 inches from January to March. Urbin land "consists of . areas that are covered by streets, buildings, parking lots, and other structures that obscure or alter the soils so that identification is not possible. The Alderwood soil in this unit is used mainly for parks, building sites, lawns, and woodland. The main 11 mitations of the Alderwood soil for homesites and septic tank absorption fields are the depth to the hardpan and wetness because of the seasonal perched water table. Drainage is needed if buildings with basements and crawl spaces are constructed. Onsite sewage disposal systems often fail or do not function properly during periods of high rainfall. Topsoil needs to be stockpiled during site preparation and subsequently used to cover the exposed underlying material. Additions of fertilizer and peat are desirable prior to seeding grass for lawns. This map unit is in capability subclass lVe. 7—Bellingham slity clay loam. This very deep, poorly drained soil is in depressional areas. It formed in alluvium and lacustrine sediment. Areas are regular in shape and are about 2 to 25 acres in size. The native vegetation is mainly grass and sedges. Elevation is 50 to 800 feet. Slope is 0 to 3 percent. The average annual precipitation is about 45 inches, the average annual air temperature is about 50 degrees F, and the average frost -free season is 160 to 180 days. Typically, the surface layer is very dark gray silty clay loam about 9 inches thick. The subsoil to a depth of 60 inches or more is mottled, gray and olive silty clay. Included in this unit are small areas of Terric Medisaprists, very poorly drained organic soils, Norma soils along upland drainageways, Kitsap and Pastik soils on terraces, and Bellingham soils that have been drained. Included areas make up about 10 percent of the total acreage. . Permeability of this Bellingham soil is slow. Available water capacity is high. Effective rooting depth is limited by a seasonal high water table that is at a depth of 0 to about 12 inches from November to June. Runoff is very slow, and the hazard of water erosion is slight. Ponding occurs from November to June. This unit is used for pasture, woodland, urban development, and wildlife habitat. This unit is suited to pasture if the excess water on the surface is removed. Tile drains or open ditches can be used if suitable outlets are available. Grazing when the soil in this unit is wet results in compaction of the surface layer, poor tilth, and reduced infiltration. Use of proper stocking rates, pasture rotation, and restricted grazing during wet periods helps to keep the pasture in good condition. Proper grazing practices, weed control, and fertilizer are needed for maximum quality of forage. This unit is suited to red alder. On the basis of a 50- year site curve, the mean site index is 83. The mean annual Increment at culmination (CMAI) for red alder at age 40 is 89 cubic feet per acre. Among the trees of limited extent on this unit are,Douglas-fir, bigleaf maple, western redcedar, and weiten hemlock. Among the common forest understory plants are trailing blackberry, western swordfern, thimbleberry, salmonberry, and, huckleberry. The main limitation for the harvesting of timber is soil wetness, which limits the use of equipment to dry p '34 (00+10 .. ........... I., ..... *.:...*..,.,.,..*.*.,. 4(o ...... . *.** ....... 4A . ....... ... .... .. . .......... ............ .*.*x.--::::i T111-- 31H, . ....... ...... eiin:... .. . .. .... . .. ........... ......... . ...... . ........................ ....... ... I., ii.; eff: i Jr do IL �o (OOP. Atr p F- P- L 0 C,4 710 AJ FIGURE A A B C D E 2 3 4 7.5 min 0 2 inch 7 min 02 inch 6.15 min 0 2 inch 6.4 min 0 2 inch 5.15 min 0 2 inch 5 3.7 min/inch 3.5 minfinch 3.1 min/inch 3.2 minfinch 2.6 min/inch 6 7 8.3 min 0 2 inch 8.3 min 0 2 inch 8.6 min 0 2 inch 7.7 min 0 2 inch 5.9 min @ 2 inch 8 14.2 min/inch 14.1 minfinch 4.3 minAnch 3.8 minfinch 2.9 min/inch 9 1 1 - I I I I 10 lave 3.9 min/inch lave 3.8 min/inch lave 3.7 min/inch lave - 3.5 mintinch lave 2.8 min/inch C C SMEET FILE CITY OF EDMONDS C A ION .CONSTRUCTION PERMIT APPLICATION USE U S E N ZONE 0 E PERMIT NUMBER 0 , a /APT # ADDRESS 19"o, 5 9Z su'l A D D R 0 E OF BUSINS J� RZE i T E A LEGAL DESCRIPTION CHECKI SUBDIVISION NO. L OL LID NO 11:511 MAILING ADDRESS . -3'5; (-r, '12W ;�(Cpn -/,t, 1,nz:5 PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP PU L EX EXISTING —REQUIRED DEDICATION S T PRO P PROPOSED TESCP App—ed AW Pe -it Requ.,ed S1,001 Be Pe-1 Req d 0 I�Specu 07Rquildld ":lt 0 Side.. R.I.k. Li III W4A IILII"INLNUIIER E C) NAME REMARKS REM, U. U. A)112�A:JK //I ADDR �tls ,7 <�2ef 7tb- z CITY - Zip ITELEPHONE NUMBER NAME EN I ENGINEERING MEMO DATED . / f . t ou le a ?e� . /xi ;, ff / 5- �;, METW; iff SUPPLY SIZE NO. OF FIXTURES ef , < ZIP CITY L EPHONE NUMBER IBUILDING Iff M Z /5', , I /,. I/ STATE LICENSE NUMBER -//- /,! -3 REMM V SIGN AREA SEPA REVIEW ADS NO. Le�ZDescription o rope include all easements ALLOWED PROPOSED COMPLETE EXEMPT Z I )A \G j , ) I SHORELINE# 0 's EXP U (A) fV) VARIANCE OR CU P EVIEW BY I/ DATE SETBACKS — FEET I'V�RAGE -7— SIDE /0 FRONT REAR 7 I . �ElqZ 11.0 1% Z Z Tax Account Parcel No. om 00 CO Cl REMARKS NEW BIRESIDENTIAL PLUMBING ElADDIALTER COMMERCIAL MECHANICAL 0 APT. BLDG . REPAIR SIGN FENCE CHECKEQ I BY I TYPE OF CONSTRUCTION CODE HEIGHT DEMOLISH CYOS I x _FT) PR 2S' CARPORT swim 0 REMODEL LIGARAGE POOL, �IALINSPECTI _14—AJ SPEC OCCUPANT JAREA ED YES JOCCUPANCY GROUP LOAD W 000 STOVE I M. RETAINING WALL/ INSORT L_J ROCKER Y RENEWAL WMARKS 0 (TYPE OF USE. BUS NESS ORACTIVITY) EXPLAIN: PROGRESS INSPECTIONS PER LIBC 305 Z NUMBER OF STORIES _TDWELLING UMBE OF T11440,44- -VI-19/4 Are AN-/ h2inc .7 U ITS 00 Z DESCRIBE W(2RK TO BE ?ONE (ATTACH PLO 4a li4 FINAL INSPECTION REQUIRED W494,ot7C VALUATION FEE A�,472- P LAN CHECK FEE BUILDING PLUMBING .515- Plan Check No. C/ MECHANICAL 217 GRADINGIFILL/ 0 This Permit covers work to be done on private property ONLY. Any const ruction on the public domain (curbs, sidewelks, 1. -ST driveways, ma�rqppftp, Etc.) will require separate permission. STATE SURCHARGE Permit Applicatio'091bays . Permit Limit: I Year - Provided Work Is Started Within 180 Days STORM DRAINAGE' FEE "Applicant, on behalf of his or her sp6use, heirs, assigns and ENO. INSPECTION FEE successors in interest, agrees to Indemnify, defend and hold `7— harmless the City of Edmonds, Washington, its officials, z' employees, and agents from any and all claims for damages of 5 whatever nature, arising directly or Indirectly from the Issuance [let &C of this permit.'Issuance of this permit shall not be deemed to PLAN CHECK DEPOSIT Q modify, waive or reduce any requirement of any city ordinance 01 nor limit in any way the City's ability to enforce any ordinance TOTAL AMOUNT DUE 1�03_�50 provision." I hereby acknowledge that I have read this application; that the ATTENTION APPLICATION APPROVAL Information given is correct; and that I am the owner, or the duly authorized agent of the owner. I agree to comply with city and laws regulating construction; and In doing the workauthoriz. THIS PERMIT AUTHORIZES This application is not a 'permit until :late d thereby, no person will be employed In violation of the Labor ONLY THE Signed by the Building Officialor his/her Code of the State of Washington relating t6y�orkmery`s Compensa- WORK NOTED Deputy; and fees are paid, and receipt is tion Insurance. INSPECTION acknowledged in space provided. SIGN TURE IOWNEFI OR AGENT) SIGNED DEPARTMENT JDATE CITY OF OFFICIAL'S ��TURE DATE v I L EDMONDS CALLFOR ,'AELEZSECSY� TE AT E TION T TIO I INSPECTION IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE 771-3202 UNTIL A F;NAL INSPECTION HAS BEEN MADE AND APPROVAL OR ORIGINAL — File YELLOW — Inspector A CERTIF CATE OF OCCUPANCY HAS BEEN GRANTED. UBC CHAPTER 3. PINK — Owner GOLD — Assess— -7, IN LTf LN, *51-� 1 pr�, qv( 1=+s ftt4a lb lop ;r L/orr q �(Sw I q 4r. 6W I tt-,. AA BUILDING MAY 0 5 1992 7-a STREET/3FLE -RECEIVED APR 2 3 1992 STATEMENT ON ACCESSORY UNITS PERMIT COUNTER Property Address Legal Description Lot M (M Z2e6, �4, C4 I have read the requirements for accessory units contained in Chapter 20.�l of the Edmonds Community Development Code and understand that an accessory unit, including a second kitchen, is prohibited for at least two years after occupancy by the -current owner is granted and until after a Conditional Use Permit has been approved by the City of Edmonds Hearing Examiner. I also understand that approval of a Conditional Use Permit is subject to a public hearing, and neither this statement nor the issuance of a permit shall act to limit the discretion of the City in the review of any application for a Conditional Use hrmit. Property.Owner Name Date STATE OF WASHINGTON) COUNTY OF SNOHOMISH) I certify that I know or have satisfactory evidence that signed this instrument and acknowledge it to be (his/her) free and voluntary act for the uses and 7X&-z purposes imentlioned,in 161his instrument. go- �k-.Sc��Z Dated 13 -/a - V;Z- '4 ON Signaiure Of Notary Public T i t 1 e zu My a0intment oil Expires 0FA' THIS DOCUMENT MUST BE RECORDED WITH THE SNOHOMISH COUNTY AUDITOR 9 2'U32 70 5 6 0, VOL. 2551PA0531 8 91 90 - "9 CITY OVV 250 - 5TH AVE. N. - EDMONDS, WA 98020 - (206) 771-0220 - FAX (206) 771-0221 COMMUNITY SERVICES DEPARTMENT Public Works * Planning - Parks and Recreation Engineering May 4, 1992 John Wolfe 315 NW 202nd Seattle, WA 98177 LAURA M. HALL MAYOR PETER E. HAHN DIRECTOR Mailed 5/5/92 SUBJECT: DRIVEWAY SLOPE WAIVER FOR 19235 93RD PL. W. Dear John, We have reviewed your request for a driveway slope waiver for the subject address and feel there is sufficient justification to approve the waiver. Therefore, the driveway slope may be placed at a grade not to exceed sixteen (16) percent. If you have any questions, please call me at.771-0220, extension 324. Sincerely, ADDISON L. CHRISMAN IV Engineering Inspection Alberts ALC/sdt SLOPEWVR.93/TXTST530 �Ac-- Incorporated August 11, 1890 Sister Cities International — Hekinan, Japan RECEIVED MAY . 51992 45u'l PERMIT COUNTER 001#0 - filfAMORP MACH sl%461 Ylo f4w tot 16roAlfl(LIF, WH filmll tk) tGAI 4AO Z;ez -tt� er i5ee- �� &AA 15!j�MC,� rW t4 PA 6" rJjj 5 Ylo 14W zoz !�,GAIIUF, WH q5tIl 6di, o"t [ehv fflb-l- var �7 g� wn 4, AA, VON' N ZA IT A- z *:40:4 -4k,4 11w, e It'll hi, r T , m pop! Yl 4 t, 10 u'l- -4 v WIT, J` A rp, 44 w 7s Ril 5k Jr: Z W4 00 -jo ING /* I Jill' Cjx(!� IV tx Ail I lip oil A,4 vw-- , . . . . . . . . . . . . . -7v ilk, N7.1. Auff 617 . nr, YL, JZ lo 'lot STREET FILE ,K ,PC�o 17� E� I tjg o 71 4- CA oil G7 flo 6 1 7Oil 3pt oil y------------------- L ;C01 I lu I 43 V. w"PRO VED 890 C) CITY OF EDMONDS 250 - 5TH AVE. N. - EDMONDS, WA 98020 - (206) 771-0220 - FAX (206) 771-0221 COMMUNITY SERVICES DEPARTMENT Public Works 9 Planning a Parks and Recreation e Engineering May 4, 1992 John'Wolfe 315 NW 202nd Seattle, WA 98177 CHIR?0"], COP svEET SUBJECT: DRIVEWAY SLOPE WAIVER FOR 19235 -�--93RD PL. W. Dear John, LAURA M. HALL MAYOR PETER E. HAHN DIRECTOR We have reviewed your request for a,driveway slope waiver for the subject address and feel there is.sufficient justification to approve the waiver. Therefore, the driveway slope may be placed at a grade not to exceed sixteen (16) percent. I If you have any questions, please call me at 771-0220, extension 324. Sincerely, ADDISON L. CHRISMAN IV Engineering Inspection ALC/�dt SLOPEWVR.93/TXTST53O * Incorporated August 1-1, 1890 * Sister Cities International — Hekinan, Japan NOTICE TO PERMITTEE AND I,* OWNER PARTIAL &R,81-T FILE VIOLATION CORRECTIONS REQUIRED pPERMIT NUMBER JO B ADDRESS 473 Awf' Re NO :Iff PERMIT - STO WORK REMOVE CONSTRUCTION OR OBTAIN El - PERMf AND MAKE WORK COMPLY WITH BUILDING LAWS. ElCONSTRUCTION IS NOT IN ACCORDANCE WITH APPROVED PLANS AND PERMIT - STO APPROVED PLANS P WORK- MAKE EXISTING WORK COMPLY WITH STOP AND PERMIT OR REMOVE IT. WORK - UNTIL AUTHORIZED TO CONTINUE BY INSPECTOR. CORRECTIONS LISTED BELOW MUST BE MADE BEFORE WORK CAN BE APPROVED. WORK DESCRIBED BELOW HAS BEEN INSPECTED AND IS APP ElCONTACT INSPECTOR AND ROVED. ARRANGE FOR APPOINTMENT ED RIECIALILL FOR INSPECTION. �77-- �,2 T,9 THE �FIONS OR CORRECTIONS INDICATED ABOVE ARE REQUIRED WITHIN DAYS OR PENALTIES IMPOSED BY LAW MAY BE APPLIED. FOR INSPECTIONS CALL low INSPECTOR BUILDING DIV. 107 -2 771-00PUBLIC WORKS C�IWT Y� 0 F _:-_ 7 2-- DATE EDMONDS El FIRE DEPT. ik k�;' -y 9 0 - .1.9 9 - City of Edmonds R �-WAY CONSTRUCTION VIL 8 T ill, PERMIT Permit Numben- 91::� '::� or" V, /- )4-�� Issue Date: T 2 '1 .2 A. Address or Vicinity of Construction: - 19235 93 place ftrt B. Type of Work (be specific): Install New Service C. Contractor: -Washington Natural Gas Compan Mailing Address: 815 Mercer Street, State License #: Seattle, WA 98111 D. Building Permit # (if applicable): Contact: Frank Swan Phone: 224-2278 Liability Insurance: Bond: $ Side Sewer Permit # (if applicable): E. 'F_1 Commercial E] Subdivision El City Project Rk Utility (PUD, GTE, W`NG, CABLE, WATER) F-1 Multi-Fan-�ily E] Single Family Other INSPECTOR: INSPECTOR: \WJTC_UT:T F. Pavement or Concrete Cut : El Yes [X]No G. Size of Cut: — I x — H. Charge$ APPLICANT TO READ A!NPDGN INDEMNITY. Applicant understands and by his signature to this application, agrees 0 th ity of Edmonds hatwile, oNnldeV or 9inages,- claims anv A:ind or description whatsoever, foreseen or unforeen, that may be made fgainst the City of Edmonds or an its ZfeDartmelnrs or eniDlov- ees, including or not limited to the defense ofany legal proceedings including defense costs, and atiorneyfees by reason ofgranting this permit. THE CONTRA CTOR IS RESPONSIBLE FOR WORKMANSHIP A ArD MA TERIA LS FO� A PERIOD OF ONE YEAR FOLLO WING THE FINAL INSPEC77ON AND ACCEPTANCE OF THE WORK ES77MATED RESTOR,477ON FEES WILL BE ftEL13 0ML THE FINAL STREET PAidH fS �rOMP&TED BY C17Y FORCES, AT WHICH 77ME A DEBIT OR CREDIT WILL BE PROCESSED FOR ISSUANCE TO THE APPLICANT. Construction drawing of proposed work required With permit application. A 24 hour notice is required for inspection; Please call the Engineering Departm 2 2'. Work is to be inspected during progress and at completion. Restoration is to be in accordance with City Codes. m4220 Street shall be kept clean at all times. < -,a Traffic Control and Public Safety shall be in accordance with City regulations as required by the Cit—yEngineer. All streef cut ditches shall be patched with asphalt or City approved material prior to the end of the working day; NO EXCEPTIONS. I have read the above statementvand understand the permit requirements and the pink copy of the permit will be available on site at all limesfor in;��zon purpol Signature: _ ___ i i , �&M Date: September 23, 1992 (Contractor or Agent) CALL DIAL -A -DIG PRIOR TO BEGINNING WORK FOREITY. USE ONLY. .. ...... ... . . ..... ... .. ...... ....... ............. . . . .... . ........ ...... . . .. ..... .......... . .......... ..... ...... . 172 ... .... RIGHT., OF. WAYMEPOSIT:�.:.... .......... .... . ...... ........ ........ TIM&AUTHORIZED: VOID AFTER-:: -,DAYS . .... DISRUPTION.FEF/FUND11.1 ........... . .... 1. . ......... .. . ... .... I., ... ........ . ....... ...... ...... I ..... .................. .. .. .... .. ... . ....... .... . . .... .. ..... ­ ............ .. .... . .. . .... ........ . ........................... ... .. . . . ..... . .......... .... ................... �SPECIAL CONDITIONS::::.''. -RESTORATIONTEE:..: ...PERM IT.. FEE,:.,. .............. . ..... . ......... . .. ........ ... . ... .. ... .... ........ .. . .... .......... ..... . ...... ....... . ... ....... ...................... ......... . ........... . . . ..... ......... ... ... .. . ... .... ...... ... ....... ... ..................... ............. I ....... ....... ............ TOTAL.FEE... COMMENTS; . ........ ... .. �....'DATE: ISSUED BY::� A WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE Engrg. Div. 1991 FIELD INSPECTION NOTES (Fund I I I - Route copy to Street Dept.)'��' Comments: m Diagram: CONTRACTOR CALLED FOR INSPECTION 0 YES 0 NO Partial Work Inspection by P. W.: Work Disapproved By: Date: FINAL APPROVAL BY: Date: Eng. Div. July 1985 .1 I � � !�?5 1 � PL W 5 OIN WN amer main aepr-n unknown / 11 gas main 14 Addendum to City of Edmonds Right of Way Permit Application Submitted by: RIC-4441P-o �tIL-L-kp.D Engineering Aide Washington Natural Gas 622-6767 x2761 pager 9(_-g - I(c% �) 6 CaTT, - -g- gas -ss- sewer -&- water hydrant 0 water valve 815 Met= St. (P.O. Box 1869), Sia— �,WA 08111 (206) 622-6767 !NFILTRATION WORKSHEET STANDARD DRAINAGE.PLAN CATC.H BASIN: 'r*-rj0& X I do 'N I -r1kWftCt4 cavom -n&4uwir-/ LCVMrL. 71t=NCJJ 4FICILF FIPV...,7 CAP TEE W/,4rLow, LE GS W7 Fine- &tuk Sces-en ciTti-dw& lb 1ao++vm or pwri—i SYSTEM CROSS—SECTION M I RA-r I _50 0 x TO 6FF—a W&1e)H1tfP TPLE�C14 COVr=R 3/40 WASME0 GRAVEL 4!Q1AM F'FRF P1 0A55CU4170A1 WgVL. IJ7 14 T(_,cortp t L,:> ct �c L.; 41- TRENCH CROSS—SECTION �41 U 0 4-'� a PCIZF PIPF- W^SHED &F-ANEL oLrrrLow TRENtm, MIN 10' LON&, -roP PVFLF PIPE TO Off LJ--VWL VA-1" D PRAY151- roP "'L 4 FROM OLMEr CON-rROL 4� PERF P%PF- WITH CkPS RUNOFF SPREADER OUTLET FOOTING DRAINS SHALL NOT BE Page 8 of 9 CONNECTED TO THE DRAINAGE SYSTEM INFILTRATION SYSTEM for location plan by phone date DESIGN DATA Trench Oerc LF ver IMDerm Trench Number Rate 1000 sq.ft. Area Req. /'^V/dp�wr/ T 44- PAN �C=/ 41 --x 0=" I- _rlaA " 0 A' 1� F7_ !t NOTES 1. Call Engineering Division (771-3202) for prebackfill and final inspections. 2. Responsibility for operation and maintenance of drainage systems on private property is the responsibility of the property owner(s). Preventive maintenance consists of preventing soil and other materials from entering trench during construction as well as after construction. Catch basins should be cleaned of floating material and sediment at regular intervals (at least twice per year). A K"i V JadjJ E, CITY OF EDMONDS PROJECT REVIEW CHECKLA�§T. FILE PROJECTNAME: -S<--c>-r7- PLAN CHECK#: 3 PROJECTADDRESS: RECEIPT DATE: 7 REVIEWED BY: I itial/Date) PLAN. WATER COMMENTS FIRE BLDG. SEWER STREET ENG. Setbacks/Variance/Setback Adjustment 1 Conditional Use Permit 2 ADB Requirements MOM HIMM 3, Other Zoning Requirements -4 Underground Wiring Required Lot Slope 15% SEPA Environmental Checklist/Hydraulics Permit it 7 Tree Cutting Plan 8 Plat/Subdivision Requirements .... . .... . . . . ................ . . . . . . . . . . . . . . . . ........ 9 Legal Description Verification ...... ... 10 Quit Claim/Street Dedications Easements - Public/Private ..... ..... . 12 Engineering Storm Drain Review Fee �v .. 13 Engineering 2.2 Inspection Fee . . . . . . . . . . . . . . . Drainage Plan (On -Site) Setback - Top of Bank, Stream, Water Courses ....... ....... . . . . . . . . . . . . . 16 Setback - Storm Drain Line -- - ------ 17 Open Ditch - Existing /.a// 18 Culvert Required Culvert Size ................................... ........................ . . . . . . . . . . . . . . . . . . . . . . . . . . . ................... ............ ....... ...... 2 Shoulder Drainage/Shale Open Runoff Catch Basin Required 22 Driveway Slope & Vehicle Access 28 Sidewalk Required Curb & Gutter Required ------------- A/ Curb Cut For Driveway Required L Street Paving Required IV' RigM-Of-Way Construction Permit Required .. ME Street Name Sign Required 29 Other Signing Required Bond Required For Public Improvements ...... . . . . . . 31- FEMA Map Check/Water Table . . . . . . . . . . . . . 321��. Side Sewer Availability . . . . . . . . . . . Calculate Sewer Connection Fee If No LID #/Is-( 34 Create Street File Existing Water Main Size H" I . . . . . . . . Water Meter Size . . . . . . . . . . . .. - 1 4-- 37 Service Line Size X,X'l 38.1 Water Meter Charge Required 3T-. Hydrant Required, . ......... 40:: Hydrant Size Existing �feEc,25 -c;zAw" ....... 41 Fire Line Charge Required - Sprinkldr "..XXX Street Cut. 43 Miscellaneous ............. 44 PUBLIC 1190RKS PERMIT APPLICATION REQURCENTMS TO: Permit Coordinator, Building Division FROM: Lyle Chrisman, Engineering Inspector OWNER: ADDRESS: After review of the subject permit application, the followmig requirements mustbe met. r— PLANCK #— DATE: 1. Construction hours are: WEEKDAYS .......... 7:00 A.M.-10:00 P.M. WEEKENDS/HOLIDAYS ..... 10:00 A.M.-6:00 P.M. 2. A separate *RIGHT-OF-WAY- Construction Permit is required for all work on Publicproperty. (ECDC 18.60) 3. Truck haul route plan must be submitte d and approved prior to permit issuance. 4. Builder/Owner is responsible for containing all temporary runoff and erosion control on site. (ECDC18.30.030a), 5. NO WORK SHALL BE DONE WITHIN 15 FEET OF STRE"S OR 10 FEET FROMANY CLOSED DRAINAGE FACIL- ITY. -'BUILDERIOWNER IS REPSONSIBLE FOR MENTIMNG CONDITIONS ON THE DRAWING. (ECDC18.30.50G) 6.,24L.TER FABRIC FENCE SHALL BE INSTALLED AND INSPECTED PRIOR TO CLEARING AND CONSTRUCT[ON. (ECDC 18.30): :.' 7.-. INSPECTIONS ARE REQUIRED ON STORM DRAINAGE SYSTEMS, TIGHTLINES, FOUNDATION DRAINS, AND CATCH BASIN INSTALLATION. INSPECTIONS ARE REQUIRED PRIOR TO BACKFILLING. (ECDC 18.30) 8. Repair or replace all defective existing curb, gutter, and sidewalk adjacent to the property. Ifaiiiiiterse-ctionism'volveda handicap'ramp may be required. Contractor shall in eet with the City Engineering Staff to determine the extent of repair prior to issuance of the permit. - (ECDC 18.90) 9. Driveway slope shall not exceed 14 % without a waiver. Every attempt should be made to keep the slope below 14%. Waiver granted to . %. (ECDC 18.80.060D) 10 - Driveways must be paved from property line to City RIGHT-OF-WAY. A separate perimit is required. (ECDC 18.80.060C) 11. INSPECTIONS ARE REQUIRED ON DRIVEWAYS AND SIDEWALICS PRIORTO AND AFTER POURING. (ECDC 18.30) 12. No burning of construction refiise without a permit from the Fire Department. 13. Connection to City water system is required. There is a separate charge for the water meter. (ECDC 7.30) 14. A back water valve is required if downstairs plumbing is below the elevation of upstream manhole. (ECDC 7.20) 15. Water and sewer mainlines should be separatedby 10 feet minimum. (ECDC18.10) 16. Connection to the City sanitary system is �guired. A separate permit is required. LID# 1.5'1 Feespaid: Yes t No Charg;R� -(ECDC18.10) 17. Underground wiring is required on aH new construction; and for additions, alterations, and repairs that exceed 50 % of the total assessed value of the structure. (ECDC 18.05.010) 18. A FINAL ENGINEERING INSPECTION IS REQUIRED PRIOR TO THE BUILDING DIVISION GRANTING OCCU- PANCY OF THE BUILDING OR STRUCTURE. (ECDC18.90) 19. ��Aw& Ike h Aarwe 2e;" /A? lvd4'm o4 zm�l ey-� " 6" 20. til hEET FILE % % LLM" IDS LU ..... ..... .. 0 ................. I .... ....... ....... ...... ...... ; ......... ............. ..... ....... . f .... . ...... ... . ... ..... % % Up �-- ................ . ...... .. ....... . ....... ......... :.- -5;! ............... . . . ... .... : ......... ... ...... . .... ............. oz ......... . ......... ........... �f.l . .................. . .... . .... . ........ * ........ ...... . ..... .. . . ... ................ Ufff ............. .. ::: gg-g...... .. ;; ....... ;; " *. . ....... ..................... .. iz . ........ ........ I -r;Z ....................... I V) S;7 'Z, -D/,j A--4=r�A,,Pr+ m on-+- 26 Af,jO <::AAjj :!:)n4F., to mm, ue tp4o-w ww- NIMA" Ape-, 1-5-v )A,g ,44 InWHC- 44 + I + 50 1 e� 600 all ic*4 / iw(vulict-4 m1wl 1%0)� AUM, V1 ~ ff VM 15 AAX.� OIL. .0 tAOA!p M&MV tX5 IV' WA4W IfAM, vow-_ APPROVED foil 41:, 4 /Z/ /PZ STREET FILE; �,�AWIW-4 1�1�bx 4tfi5p M44, 46W(W� NOM6 / Wr- flov R7 City of Edmonds RIGHT-OF-WAY CONSTRUCTION PERMIT Permit Number: /9!� Issue Date: _K' -A (it, A. Address or Vicinity of Construction: _JqZJS '339-D RL KJ B Type of Work e snecific):e-vT at-n &-smiu-m A. C-r-D"l- 9 0 - 199 be4_ W L-W P-L-G10(=NC& - O&S-10(24- AS-91AAL-T W%e=J Cv�KdGif=D- iNS'r v'(�, C. Contractor- P'J 0 Contact: Y—V g:r M f�-R,:T I r'.J Mailing Address: 2_ioi4� "wA ciq F_DhatmS Phone: (610-712C>77 State License #: Ci *SO 7- 6 Liability Insurance: Bond: $ D. Building Permit # (if applicable): Side Sewer Permit # (if applicable): E. -R Commercial D Subdivision El City Project 0;*J4!1Ti1ity (PUD, GTE, WNG, CABLE, WATER) R Multi-Fam�ily &;ooSingle Family FJ Other INSPECTOR: INSPECTOR: F. Pavement or Concrete Cut &Wes []No G. Size of Cut: x 2-7 S' H. Charge $ APPLICANT TO READL4ND SIGN INDEMN11T. Applicant understands and by his signature to this application, agrel76 hold the City of Edmonds harmlessfrom injuries, damages, or I claims of any kind or description whatsoever, foreseen or unforeen, that may be made -against the City of Edmonds, or any of its departments or employ- ees, including or not limited to the defense of any legal proceedings including defense'��sb,,AaAd attorney fees by reason �f iran 'n - is�e;&. Rth THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF YEAR FOLLOWING THE'FINAL INSPEC77ON AND ACCEPTANCE OF THE WORK. ES77MATED RESTORA 7TON FEES WILL BE HELD THE FINAL STREET PA TCii IS' COMPLETED BY C17Y FORCES, AT WHICH 77ME A DEBIT OR CREDIT WILL BE PROCESSED FOR LS& NCE TO THE A PPLICA NT. Construction drawing of proposed work required''W"it'll' t pli ti , permN ap ch ont A 24 hour notice is required for inspection; Please call t e . gineering Department- 771-3202. U A NCE TO, h E gi Work is to be inspected during progress and at completion. Restoration is to be in accordance with City Codes. Street shall be kept clean at all times. , C Traffic Control and Public Safety shall be in accordance with ity regulations as required by the Ci�y E n "-.w i All street cut ditches shall be patched with asphalt or City ap oved nkiteAal prior to the end of"the"i" no 9 day; NO EXCEPTIONS. I have read the above statements and understand the permit requ' ents and the pink copy of the permit will be available on site at all timesfor inspection purpo S K Signature: V.�J�4 CA F Date: (0 (Contractor or Agent) I CALL DIAIA-DIG PRIOR TO BEGINNING WORK .... ..... ..... FOR CITY USE ONLY ..... ..... ... ... ... ... ............. ..... ..... APPROVED:ZY:. RIGHT,OF WAY DEPQSJT:� ............ ... ........ . ........ .................. .... ..... . .. . ....... ......... ........... ........ ...... — ....TIME:AUTHORIZED: VOID AFrER.. DAYS . ..... DISRUPTION FEE/FUND. 111: ...,SPECIAL.-CONDrrIONS:,:- ........ ... .. . ..... .. ........... RECEIPT NO: 0 NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE Engrg. Div. 1991 ,-! � .1 FIELD INSPECTION NOTES (Fund I I I - Route copy to Street Dept.) Comments: Diagram: CONTRACTOR CALLED FOR INSPECTION 0 YES 0 NO Partial Work Inspection by P. W.: Work Disapproved By: Date: FINAL APPROVAL BY: Date: Eng. Div. July UNDERGROUND PRIMARY LAYOUT SHEET. 2173 1/88 PUBLIC UTILITY DISTRICT NO.1 OF SNOHOMISH COUNTY LOCATION lliz 3 s 939-0 P L_ L0 CC:> AREA POLE NO. -5 C- 1/4 S 13 T 2 77 R :5 DATE z z - 9 a W. 0. NO. _0 0 C-D 0 Z B REASON FOR wbRK_.?`2_ojioC- '-A (-. p P-II, 5VL ENGINEER MAR�'Tir%) DWC. NO. C)'l -7 +0_7 'Fo 2 a E P_-T ��C077 DRAFTER U. G. NO. 6-A:s SCALE. I'/= I oc� SUBSTATION CIRCUIT NO. PHASE ENVIRONMENTAL ANALYSIS S EXEMPT 0 NOT EXEMPT PARA. 18 ITEM C_ FEES REO'D' 0 YES G NO PRIMARY OVERHE/ D O.H(:�COND. _Z KV PRI CABLE 'OF 1/0 e-ON(- Ze-TO 0 RESIDENTIAL 0 COMMERCIAL ADD -114-5 CKT. FT. I PH LEO# / I s @ / REM — CKT. FT. — PH -SOO SEC CABLE IS /OF 3_S0Y_C)A -rQ p NET * 4-4-S CKT. FT. (SPECIFY IF I RUN OR PARALLEL & SIZE) SECONDARY OVERHEAD XFMR(S) 15 K VA KVA _KVA 0. H. U.C. COND. KV BASIC _EE S tic /2,+OV -V V @ ADD ::KT. FT. PH DUCT BY CUST -OF PVC STEEL METER/CONV. POLE S R EM :KT. FT. PH DUCT BY PUD 4-SO 'OF C-PVC-7) STEEL NET :�KT. FT. DUCT PRIMARY UNDERCROJND 0 RESIDENTIAL 0 COMMERCIAL PERMITS (DATE GRANTED) FUSING AMPS BASIC -_EE S 0 TREE TRIM CUST PROVIDES VAULT SIZE LEU# 0 STATE PUD PROVIDES P-VAULTSIZE4zX ZY-50 C 0 COUNTY JOINT XING —TEL —TV AUTH @ LAYOUT LEGEND W CITY El ABOVE GROUND J-BOX PADMT TRANSFORMER SECONDARY UNDERGROUND EASEMENTS 91 REQUIRED HANDHOLE 0 BASIC 'EE S E# 0 NOT REQUIRED PDMT SINITCH CABINET @ SECONDARY PEDESTAL UG PRIMARY TRENCH UNDERGROUND PL�\T '��14/0 AL TRX DB SEC CABLE - - - - - - BASIC FEE S_ DATE SENT TO R/W (o KCM AL TRX DB SEC CABLE ....... FOREIGN CONTACTS t FT. @ S 8 AL DB STREET LT CABLE E GTNW JPN# STREET LIGHT 0 STREET LIGHTING EXISTING DUCT t FT. @ $ 0 CATV JPN# FUTURE DUCT 0 JOINT TRENCH GTNW & CATV U EXISTING UG U WORK IN RIGHT OF WAY 0 JOINT BORE GTNW & CATV POLE & OVERHEAD LINE 0 PRIMARY 0 SCHEMATIC LEGEND L 0 . SECONADARY POLE STENCILING 10 PADMOUNT TRANSFORMER FT. @ S 30 PADMOUNT TRANSFORMER FROM TO MISCELLANEOUS F:_ES FEED THRU BUSHING ON XFMR VAULT S TAKE OFF POLE 11/0 AL CNCTRC NEUT DB PRI CABLE PRE—CONSTR. REOUIREMENTS i-Box 0 PERMIT S 0 TREE TRIM N PUD LOCATOR FUSE 10 EXISTING OVERHEAD V BACKHOE 0 20 EXISTING OVERHEAD N ONE CALL DATE 30 EXISTING OVERHEAD TOTAL )UE S DISC. SWITCH (NORMALLY OPEN) DISC. SWITCH (NORMALLY CLOSED) DATE PAID STANDOFF BRACKET RECEIPT# FEEDER CABLE NEW SVCE APPLICATION# PULL THRU BOX LOCATION MAP PAGE fs+ �-70' Z " PVIL a I OPCIQ (-UT cy I.5,TI w(, 1-70 2-0, o9cri c-v-r 9-opa Aloje, W,'rvi 2" Pve- al pvD c_vT lro iL c 9 o s c! N PVIL eN PVD tj R�j 0 19 0, Q-T 4 <, a s 9- 1 vi U12 2 " PVC- 61 p u o I rj e-VL-- loc - spc- D o.PF-rj C-OT ir--y I STI N c, t0% !6 9 H A LT . _z i g -a 5" C&$ U 6 8 L ,TO p 0,0 P4k IL V 4 C 0 a. f-j & fL P&^j 60T7am ito I-ri(,4- j_-Ijo wouc >- 4-T I-c> LJD-r Kjumj�; I aecr, f,A Y 9' coefkz (z - tl;t-L 14 t AK- I IJ 4�_ '? -_>70 Z P, L-L !P 0 ii_� CvT > + %'Ij t4�f_- r�j NC�-k � N m IF I L� iI5_--T