Loading...
19411 84TH AVE W.PDF111111111111 7866 19411 84TH AVE W NOTICE: N'o warranty OT a ' -C-C e a'ttached The -information shown on th map(s) was compiled for use by the C'ty of Edmonds,, its Employees and Consultants. Th,e City of EcIm.onds does not - warrant the accuracy of anything set for.th on these map(�_). Any person or entity -requesting a copy should conduct an independent -ation shown on inquiry regarding the inform _tFe -map(s), including, but not limited to -er stub shown. Such the lociation of any sew sewer stubs may or may- not exist and may or may not exist at the� location shown. o nor its Neither the City of Edm 'nds- h-a-1.1 be 1--ia-b-IFe for the ernpto-yee-s o-r off i-k,.e*rs -s i information given' on this map(s), nor for esentation provided based any one repr upon . said map(s). CITY OF EDMONDS Call PRospect 6-1107 when work CIVIC CENTER — WATER -SEWER DEPARTMENT ill ready jar inspecuon. (No inspec.- tions Saturday, Sund" or holiftys.) N2 1634 SIDE SEWER PERMIT ADDRESS---------------- .. Aven .. ue,-Xcat .............................................. I ........................................................................ OWNER .......... Garold ... Ramon --------------------- ---------------------------- coj-jjri[&ACToR ......... Owner --------------------------------------------------------- Permission is granted --rebruary-17 ........... 196.7-, for ...................... days, to REPAIR or CONNECT a side sewer with City Sewers in accordance with application on file and governing ordinances. ATTENTION IS CALLED TO THE FOLLOWING: NOTE No. I —The owners of the Property May Obtain & permit to construct sewer inside property line. A licensed Side Sewer Contractor must be employed to construct side sewer In street area. Do not cover any portion of sewer before it has been inspected. NOTE No. 2—Obtain full Information regarding Ordinance 11.16.DW and Regulations governing side sewers when you get permit. NOTE No..3—Top of side sewer must have at least 30 inches coverage at property line and 12 inches inside property line; minimum grade of 2%_ No bends in grade sharper than % will be permitted. NOTE No. 4—Trenches In street must be water settled and surface of street restored to original condition. Contractors shall be responsible for failure due to Improper work which may develop within one year of completion. NOTE No. 5—It Is unlawful to alter or do any other work than Is provided for in the permit, or to do any work on the main sewer or Its ap- purten&nces except to insert the pipe into the wye. APPLICATION 4TREET FILE for The City of Edmonds SEDE SEWER PERMIT -30 0 NEW CONSTRUCTION E] REPAIRS OWNERI>g ..................................................................................................... ,--, 45P'15�1 1-1/ 1�r � -/' I-e -,� I Z// ADDRESS Z� .... .............................. ............... ............ ....................... 0 Llf EASEMENT No . .......................................... CONTRACTOR ............ LEGAL DESCRIPTION: LOT No. ;2� ..................................................... PERMIT No. .......................................... BLOCK No . ............................................ nip -5 .............................................. NAME OF ADDITION r ;j '��! '7 1 S 49 7 Approved: ............ ... . ... ... . ........... . . ** . ............ DATE: �-XS-). 0 0 ;Oootl!!! ",041 \ i.5 L. W4W -rFs-r&40 BLj'r ov4oT— IAJS PaC r(jV - r-IR, 17 lose PERMIT coupp CITY Copy Ll Thd Nnv44,.2/0 r-?- -f: Alr- Excap7 n�*-V- 0'4 eov 9,�ad C--At -AD