19823 80TH PL W.PDF111111111111
7292
19823 80TH PL W
Charles J. Morrison
19823 80d' Place West
Edmonds, Washington §8026
February 4, 1997
Barbara Fahey
Mayor
City of Edmonds
505 Bell Street
Edmonds, WA 98020
Dear Madam Mayor:
RECEIVED
TEB o 7 1007
OFFICE OF THE MAyop
4 1997
ENGINEERINO
The average citizen is ill-equipped to deal with the power of government. I am very
disappointed with the contacts and attitude encountered with city employees
relative to my constant complaints never addressed.
As yet I have not been given the opportunity to tell anyone what really occurred,
except the "staff". If the staff,can transfer the "blame", one must be sure whose
perspective it benefits. Therefore, I respectfully ask for a short time to address the
City Council and protect my civil rights.
The blame game is a diversion and solves nothing, especially when it is
inappropriately accepted.
Respectfully,
--Z
Charle! on
CITY OF EDMONDS
CIVIC CENTER - EDMONDS, WA 98020 - 1206) 775-2525
��s t . 1 S 9"3
December 2, 1996
Mr. Charles Morrison
19823 80th Place West
Edmonds, WA 98026
Dear Mr. Morrison:
BARBARA FAHEY
MAYOR
As I explained in our phone conversation, City Clerk Sandy Chase referred your concerns to my
office about the reconstruction of the street in fi7ont of your home that took place about 2 1/2
years ago. I have reviewed your complaints with Community Services Director Paul Mar, City
Engineer Jim Walker, and Construction Inspector Lyle Chrisman. Once again, after reviewing all
information and talking with staff, it appears that staff has done as much as they are able to do.
The City staff does not actually do construction work. We contract out for those services, just as
was done with the area in front of your property. Because of the length of time since the work
was done, the original contractor is no longer responsible for problems.
At this point, I have no idea if we will ever be able to resolve this problem to your satisfaction.
Staff tells me that corrections they feel would work are not acceptable to you and feel your
recommendations are not feasible. However, as I indicated when we spoke, there is one final
process that can followed which will involve an independent contractor. I recommend that you
provide me:
a writtencurrent estimate from a contractor for the cost to solve the problems you feel need
to be corrected; and
2. the enclosed claim form completed by you.
These two documents will be evaluated by the City's insurance provider to determine if you have
a valid claim. If you do, the cost of the contract work wiH be covered. If they deny the claim,
your only recourse would be a legal action against the City. I do not have the ability to authorize
work that has not been approved through this process because of the length of time that has
passed since the completion of the original project.
I want to emphasize you should not have the work done to the drain in anticipation of a
satisfactory outcome. If it is denied, you would not be reimbursed except as a result of a legal
decision. If you failed in that action, you would be responsible for the contractor's fees.
Incorporated August 11, 1890
Letter to C. Morrison
December 2, 1996
Page 2
I am sorry there is no other recourse, but this is the only action available to you.
Sincerely,
Barbara Fahey
Mayor
BF/dm
Enclosure
c: Community Services Director Paul Mar
City Engineer Jim Walker
Construction Inspector Lyle Chrisman
City Clerk Sandy Chase
WinWor,d6\CS96\Moffison
1�
City of Edmonds
Claim for Damages Form
Please take note that
who resides at
mailing address
residence address for six (6) months prior to dateof this claim
home phone # work phone #
of and from the City of Edmonds in the sum of: $
This claim for damages arises out of the following circumstances listed below.
Date of Occurrence:
Time:
claims damages
I
Location of Occurrence:
DESCRIPTION:
1. Describe occurrence explaining the nature of the defects or am of negligence causing damages.
(attach an extra sheet for additional Information If needed)
2. Provide a list of witnesses, if applicable, to the occurrence including names, addresses, and phone numbers.
3. Attach copie
License Plate #
Driver:
Address:
Phone:
Passengers:
Address:
of all documentation relating to expenses, injuries, losses, and/or estimates tor repair.
"Additional Information Required for Automobile Claims Only"
DriverLicense# ' _Type Auto_ (Year)_ (Make)_ (Model)
Owner:
Address:
Phone:
Address:
Ownerjs Insurance Co.: Policy Number:
I
Have you submitted a claim for damages to your insurance company? Yes
No,
Note: This form must be signed and notarized
being first duty swom, depose and say that I am the claimant for above described; that I
h a-ve read the above claim, know the contents thereof and believe the same to be true.
State of Washington (Claimant's Sign ture)
County of
Subscribed and sworn to before me this day of '19
Notary Public in and for the State of W5iifi-ington
EWA
MEMORANDUM
Date: November 20, 1996
To: Dee McGrath, Executive Secretary
From: Sandy Chase, City Clerk�v
Subject: Citizen Complaint
I received a telephone call today from:
Charles Morrison
19823 80th Place West
Edmonds, WA 98026
776-5122
-Nov. U 1996
ICE OF YoR
OFF
Mr. Morrison asked if the City had an Ombudsman who could intervene on his behalf. I stated
that I do not believe we have an official Ombudsman at this time, however, I could refer his
concerns to the Mayor's Office.
He has a concern about the reconstruction of the street in front of his home that took place about
2-1/2 . years ago. He particularly objects to the work performed by the contractor. He asked the
question: "Can the City hire a contractor to do this work without telling me?"
He mentioned several staff members that he has tried to work with,' however, he indicated he
d oes not ever receive a response. (He has spoken with Lyle Chrisman., Jim Walker, Bill Stroud,
and left messages for Paul Mar.) Mr. Morrison stated he receives messages that staff will get
back to him, however, they never do. He did receive one call from Jim Walker at 7:00 a.m.; Mr.,
Morrison objected to this cal I because it was so early, he was not home, and Mr. Walker'spoke to
Mrs. Morrison who is ill.
Mr. Morrison would like someone to take a look at the work that was done by the contractor. He
mentioned that three drainage basins were put in to do the job of one. His driveway drained
perfectly before the work was done, however, this is no longer the case. Mr. Morrison was
promised another basin would be put in, however, he feels this would be ridiculous as it would
only be a few feet from a drainage basin that was not put in correctly.
He would like to have someone from the City meet with'him and look at the work that was
completed, so that he could demonstrate that the work was not done properly. He would like
someone to come out who does not have a "vested interest" in this matter (i.e., not Jim Walker,
Lyle Chrisman or Bill Stroud).
City of Edmonds cq Administrative Services
Mr. Morrison stated he wanted to try "one more time" to work with the City before he takes the
matter to court.
I told Mr. Morrison that I would refer his concerns to the Mayor's Office. Rather than have him
repeat the issues again, I told him I would forward my notes to you.
Office of the Mayor
—CITY'OF EDMONDS
Laura M. Hall
CERTIFIED MAIL STREET FILE
February 9,1995
Charles Morrison
19823 80th Place West
Edmonds, WA 98020
RE: REAR DRIVEWAY, YARD, AND STEPS
Dear Mr. Morrison:
In response to your letter of January 10, 1995, 1 have discussed your concerns with Acting
City Engineer Jim Walker and Cornmunity Services Director Paul Mar. I am convinced that
staff has done everything possible to correct the problems in your rear driveway, yard, and
steps.
Mr. Walker has had several conversations with you about the work that was done by the
private contractor for the City, and staff has been out to your property to investigate your
complaints. There is nothing more we can do. Due to the length of time since that work
was completed, and the fact that a private contractor did the work, we feel the only
recourse at this time would be to file a claim. I believe Mr. Walker has already forwarded
claim forms to you.
I am sorry I cannot respond to you in a more positive, satisfactory way. If you need more
information about filing a clairn,. please feel free to contact'Rhonda March, our City Clerk,
at 775-2525. 1
Sincerely,
Laura M. Hall, Mayor
CITY OF EDMONDS
LMH/dm
c: Paul Mar, Communitv Services Director
Jim Walker, Acting ' City Engineer
Rhonda March, City Clerk
WinWord6\Com.n-LSrvc\Monison
0 Incorporated August 11, 1890 e
505 Bell Street - Edmonds, WA 98020 - (206) 775-2525 - Fax (206) 771-0221
CITY OF EDMONDS
250 - 5TH AVE. N. - EDMONDS. WA 98020 - (206) 771-0220 - FAX.(206) 771-0221
COMMUNITY SERVICES DEPARTMENT
Public Works * Planning * Parks and Recreation # En in-arin
C� - to V
90. 11)
October 5, 1994
-9 IN
Charlie Morrison M117
19823 80th PI W
Edmonds, Wa 98026
Re: 200th St SW and 80th Ave W Sidewalk Project - E9DB
Follow-up to Phone Conversation on 9129/94 Regarding,
Rear Driveway for 19823 - 80th P1 W.
Dear Mr. Morrison,
LAURA M. HALL
MAYOR
"r Ji to /c, /7 �
I have attached sections from the project contract documents relating to damage to private
property and asphalt concrete pavement. -Most of the specifications on asphalt pavement are
found in the WSDOT 1991 Standard Specifications. You can review a copy of the standard
specification in our office at 250 5th Avenue North. Copies of the 1994 Standard
Specifications and possibly the 1991 edition are available for purchase at the WSDOT office at
15700 Dayton Avenue North in Seattle.
Our last call was the first time Lyle or I have heard you state that you did not give the
contractor permission to enter your property. Lyle stated that you had discussions about
extending a thin overlay of asphalt all the way up the driveway to keep a consistent appearance
and eliminate the possibility of ponding where the.new paving stopped. Lyle also noted that
you allowed the contractor to modify the asphalt at the connection to your stairway to provide
a smoother transition. City policy is to not allow contractor or City crews to work on private
property without the permission of the property owner. I ,
I have also attached page 1-60 of the WSDOT specifications and page 1-7 of City
Modifications to the Standard Specification, which cover Protection and Restoration of
Property. Although you indicated you are not willing to file a claim, a claim form is attached
for your use. If you do decide to file the claim, please return it to the City Clerk at 505 Bell'
Street. J.f you have any questions, please call me at 771-0220.
Sincerely,
JAMES C. WALKER
Assistant City Engineer
JCW/sf
Attachments
MORRISN2.DOC
o Incorporated August 11, 1890 *
1,07 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBI 1(!
Tle Engineer will not permit the area of excavation. borrow, and embankment work
to exceed the Contractor's ability -to meet the schedule for finish grading, mulching,
seeding. and other permanent erosion control work.
Clearing and grubbing, excavation, borrow. or fill within the right of way shall never
expose more than 750.000 square feet of erodible earth. unless the Engineer approv,4
otherwise. The Engineer may increase or decrease this 750.000-square-foot limit in lig�t
of project conditions-
71c Engineer may require temporary control measures if it appears pollution 0,
erosion may result from weather, the nature of the materials, or progress on the work ' 'at
Engineer may also require permanent erosion control work to be done with or
immediately after grading.
. When temporary control devices are no longer needed, the Contractor shall remove
them and finish the areas they occupied as the Engineer directs -
Nothing in this section shall rellcvc the Contractor from complying With othe
I
contract requirements -
If done according to the approved plan or the Engineer's orders. temporary water
pollution/crosion control work will be measured and paid for-
1. At Unit contract prices if the work differs little firom specified contract work. or
2- By force account, Section 1-09-6. if not covered by contract items -
For the purpose of providing a cornmon proposal for all bidders. the Contracting
Agency has estimated the cost of "Temporary Water Pollution/Erosion Control" and has
entered the amount in the proposal to become a part of the total bid by the Contractor -
'Me Contractor shall bear full responsibility for temporary water pollution control in:
all sources of material, disposal sites. and haul roads the Contractor provides- All costs
for this work shall be included in the various unit prices for materials obtained from or
hauled to Contractor-providod sites -
Erosion control items named in the contract shall be considered permanent control'
measures and paid for at unit contract prices-
1-07-16 Protection and Restoration of Property
1-07-16(l) Private/Public Property
The Contractor shall protect private or public property on or -in the vicinity of the
work site- The Contractor shall ensure that it is not removed. damaged, destroyed. or
prevented from bcing used unless the contract so specifics.
Property includes land, utilities. trees. landscaping. improvements legally on the
right-of-way. markers. monuments. buildings, structures. pipe- conduit� sewer or water
lines. signs, and other property of all description whether shown on the plans or not -
If the Engineer requests in writing, or if otherwise necessary, the Contractor shall
install protection, acceptable' to the Engineer. for property such as that listed in the
Previous paragraph. 'Me Contractor is responsible for locating all property that is subject
to damage by the construction operation -
If the Contractor (or -agents/employees of the Contractor) damage, destroy, or
interfere with the use of such property, the Contractor shall restore -it to original
condition- The Contractor shall also halt any interference with the property's use- if the
Contracto� refuses or does not respond -immediately, the Engineer may have such
property restored by other means and subtract the cost from m
the Contractor. I oney that will be or -is due
Pnfye 1-60
Class 0 trench backfill - 951; ASTM D 1557 or 95t WSDOT
test Method No. 606
Class C trench backfill - 901; ASTM D1557
Soil embankment - 95%. ASTM D 1557
Granular embankment 95*6 WSDOT test Method 606 or 95%
ASTM D1557 ,
For any other materials not addressed in this Section,
Chapter 9 of the WSDOT Construction Manual shall be
followed.
1-06.2(2)
Statistical Evaluations of Materials for Acceptance
Delete 1-06.2(2) except Paragraph C-
1-07.
LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC
1-07.1
Laws to'be Observed
Add: The Contractor shall observe all ordinances,
codes, and permit requirements of the City.
1-07-2
State Taxes
: Sales tax shall not be included in bi'd items and
shall be paid by City when applicable at the time of
progress payments.
1-07.9
Wages
Add: The Contractor shall pay all required fees
established in WAC 296-127-045 and consider said fees
incidental to the project.
1-07.11(3)
Delete
1-07.11(4)
Delete
1-07-11(5)
Delete
1-07.11(6)
Delete
1-07-11(7)
Delete
1-07.11(9)
Delete
1-07.11(10)
Delete
1-07.16
Protection and Restoration of Property
1-07.16(l)
Add: In the event that damage occurs, the claim for
damages are filed by the individuals, and the City will
request that the Contractor give evidence that he has
requested his insurance company make personal c6ntact
with the claimee- Any settlement for insurance claims
shall be strictly an act restricted to the claimee, the
Contractor, and his insurance company.
1-7
March 12, 1992
CITY OF EDMONDS.
Modifications to Divisions 3 through 9
The -following technical specifications shall be modified, clarified, or
superseded as described below.
5-04 ASPHALT CONCRETE PAVEMENT
5-04.3(4) Rollers
Pneumatic tire rollers shall not be used unless
specified in the Special Provisions-
5-04.3(17) Paving Under Traffic
Open -trenches within the traveled way or auxiliary lane
shall have a steel -plate cover placed over them. A
wedge of suitable materials, if required, shall be
placed for a smooth transition between the pavement and
the steel plate- Warning signs shall be used to alert
motorists of the presence of -the steel plates.
5-04.5 Payment
Payment shall include tack coat as being incidental to
the bid items. Cold patch or temporary patch as
directed by the Engineer shall be paid for a two (2)
inch thickness per unit measure as stated in the
proposal.
6-02 CONCRETE STRUCTURES
6-02.3(l) Classification of Structural Concrete
Class 3000 concrete, minimum 5 112 sack (94 pound sacks)
mix, shall be used for all concrete work, including
extruded curbs, retaining walls, and small structures.,
6-02-3(6)A Weather and Temperature Limitations
Protection of Concrete
A clear, not white, curing compound shall be brushed or
sprayed on all exposed concrete immediately after the
finishing work. Other protective measures against
temperatures, including wind chill factor, below 40
degrees F, and against potential damage due to weather,
are still required.
6-02.3(12-13) Construction, Trowel, and Expansion Joints
M-1 June 5, 1992
the utility adjustment be left overnight without an -asphalt
patch. All patching work shall be performed solely by the prime
asphalt contractor responsible'for the overlay work. Patching
work is subject to rejection and complete removal if it does not
match the texture and smoothness of the new overlay pavement.
10) Adjusting Manholes, Cleanouts and Catch Basins to Grade
All manhole and cleanout adjustment shall be accomplished after
the final roadway pavement.operation is completed as expediently
as possible (see Section 1-05.11a, Substantial Completion) but
shall be raised prior to walkway paving. The existing castings
and lids shall be brought flush with the surrounding finished
pavement surface and an asphalt patch consisting of Class "G" ACP
per Manhole Adjustment -Detail shall be constructed.
10a) Water Valve Boxes
Existing water valve boxes consist -of cast iron, two-piece,
slip -type boxes with covets. Adjustment*requires raising the
upper section of the valve box to final grade. Additional riser
sections ' may be required to perform the adjustment- Any loose
pavement or other ' debris will be kept from dropping into valve
box and interfering with the operation of said valve. The
Contractor shall remove any and all debris from the adjusted
valve boxes to ensure such operational condition.
10b) Adjust Survey Monument Case and Lid to Grade
Survey monument cases shall be adjusted to the finished grade of
the proposed asphalt overlay surface per the -standard details.
11) Pavement Grinding or Removal
Grinding or removal of the existing asphalt concrete pavement
thickened edge and other road surface is required as shown on the
contract drawings. Grinding will also be required at each end of
the project and at side street intersections. Grinding width for
thickened edge is three (3) feet and depth shall be to existing
road surface. Grinding depth of side streets shall be one and
one half (1 1/4) inches. Asphalt grindings from this project may
be used as part.of fill in lieu of crushed rock underneath the
sidewalk.
12) Asphalt Concrete Pavement Materials
The overlay shall be Class "B" "modified" asphalt concrete
pavement (AR-4000) consistent with the material specifications
identified in Sections.9-02 and 9-03 of the standards -
"Modified" shall be interpreted that the aggregate size shall be
on the finer end of the size range required for Class "B" asphalt
concrete pavement. Minimum compacted thickness shall be-1-51, for
each lift as noted in the plans.
SP-4
Where indicated in the plans, or as directed by the Engineer, the
Contractor shall feather and shim street surfaces, walks, or
driveways within street improvement areas to an extent that
provides a smooth -riding connection and expeditious drainage flow
to -or from the newly paved surface. Shimming and feathering, as
required in the plans, shall be accomplished by raking out the
oversized aggregates from the modified Class "B" mix.
Measurement shall be per ton of modified Class "B" asphalt
concrete in place as determined from truck weight tickets
deli"vered to inspector' on job site. Tickets for walkway shall be
kept separate from all other tickets.
13) Reconstruct Vertical Curve: Sta 14+00 - 17+00
Includes all excavation, 'grading, compaction, haul and disposal
of material for construction of vertical cuve and reconstruction
of driveways as specified on the plans; also includes prelevel, of
driveways. Contractor shall set new survey monument and case in
concrete to grade at intersection of 83rd Pl. W. and 83rd Ave. W.
with 200th St. S_W_
14) Measurementand Payment Summar
The following is a general summary of pay item descriptions
listed in the bid proposal and defined in the contract document -
All pay items shall include all costs of equipment, materials,
and labor required to make the installation complete per the
plans, details, and specifications. Imported materials shown on
the details shall be considered incidental to the appropriate bid
item.
Measurement for storm pipeline on a unit cost basis shall be the
actual footage from centerline of catch basin to centerline of
catch basin. Measurement for imported bedding shall be the same
as for pipe- Patching shall be the actual square footage
measured -
Item Description
Mobilization Bond and insurance, site move -in.
Traffic control Conform with MUTCD and approved
traffic control plan, detour
planning and set-up, flaggers,
signs, barricades'. lights,
coordinate with Maplewood
Elementary School -
Storm sewer pipe Excavation and removal of existing
pipe, pipe, imported bedding and
native backfill, compaction as
required per backfill, disposal of
waste materials, dewatering,
SP-5
City of Edmonds
Claim for Damages Form
Please take. note that
1-io resides at
ailing address
residence address for six (6) months prior to date of this claim
, home phone # work phone #
of and from the City of Edmonds in the sum of: $
This claim for damages arises out of the following circumstances listed below.
Date of Occurrence: Time:
Location of Occurrence:
DESCRIPTION.-
1. Des . cribe occurrence explaining the nature of the defects or acts of negligence causing damages.
claims damages
(attach an extra sheet for additional information if needed)
2- Provide a list of witnesses, if applicable, to the occurrence including names, addresses. and phone numbers.
3. Attach copies of all documentation relating to expenses, injuries, losses, and/or estimates for repair.
"Additional Information Required for Automobile Claims Only"
License Plate # Driver License # . Type Auto _ (Year) _ (Make) _ (Model)
Driver:
Owner:
Address:
Address:
Phone:
Phone:
Passengers:
Address:
Address:
Owner's Insurance Co.: Policy Number: _
Have you submitted a claim for damages to your insurance company? Yes
No
Note: This form must be signed and notarized
1, being first duly sworn, depose and say that I am the claimant for above described; that I
h0e read -the abov�im, know the contents thereof and believe the same to be true.
otate of Washington
County of (Claimant's Signature)
Subscribid and -sworn to before me this day of ig
tary Public in and for the State of Washington
CITY OF EDMONDS
LAURA M. HALL
250 - 5TH AVE. N. EDMONDS. WA 98020 - (206) 771-0220 - FAX (206) 771-0221 MAYOR
COMMUNITY SERVICES DEPARTMENT
Public orks * Planninn * Parks and Recreation * Ennineerinn
ok -
9 0 - 1 9
September 22, 1994
Charlie Morrison
19823 80th PI W
Edmonds, Wa 98026
CHi R, 0?� I
N COPY
Re: 200th St SW and 80th Ave W Sidewalk Project - E9DB
Rear Driveway for 19823 80th PI W.
Dear Mr. Morrison,
9 1� ,
)il,�Q , 3 /C�/v
This letter is a follow-up to -our conversation on August 3, 1994 at your property
regarding your driveway. As I told you in our phone conversation several days later,
I needed to speak with Noel Miller, Public Works Supervisor, regarding any work the
City's Public Works Division would do.on the project and was just able to meet with
him last Friday.
A summary of the problems you perceived as needing to be resolved with the driveway
when we met on August 3, 1994 were:
1. Inadequate drainage of water off the driveway.
2. Poor asphalt surface quality.
3. Unacceptable slope in walking, path between stairway and driveway area.
The City does not see any problems with the asphalt surface quality or with the slope
between the stairs and driveway. Public Works can -assist with the buildup of water off
the edge of the driveway by installing a drainage inlet along the north edge of the
driveway west of the sidewalk.
If you believe the contractor caused you damage by his action in 1992, you can file a
claim form with the City. Claim forms are available from the City Clerk. Please
contact me if you would like the City to install a drainage inlet in the right-of-way
behind the sidewalk next to your driveway.
Sincerely, i
JAMES C. WALKER
Assistant City Engineer
JCW/sf
MORRISON.130C
- 0 Incorporated Ati-gust 11, 1890 *
Sister Cities International — Hekinan, Japan
CITY OF EDMONDS
250 - 5TH AVE. N. - EDMONDS, WA 98020. - (206) 771-0220 - FAX (206) 771-0221
COMMUNITY SERVICES DEPARTMENT -
Public Works e Planning * Parks and Recreation o. En inearin
a - U to
a.9 0
July 19, 1994
�_Opy
Charlie Morrison
19823 80th PI W
Edmonds, Wa 98026
Re: 200th St SW and 80th Ave W Sidewalk - Project E9DB
Rear Driveway at 19823 80th PI W.
Dear Mr. Morrison,
LAURA M. HALL
MAYOR
7 It � /I /Y
This letter is a follow-up to our conversation last week regarding your driveway. The
Assistant City Engineer looked at the driveway and did not see any structural problems
with the asphalt surface. The edge cracks previously noted are most likely the result
of extra asphalt placed beyond your original driveway.
In order to conclude the subject issue,* would you please send us a letter stating exactly
what you think has yet to be resolved to your satisfaction . We would like to set up a
meeting with you, Bill Stroud, who is the Supervisor of the Street Division, and
Engineering to go over your concerns. The reason for the involvement of the Street
Division is that any work to be done will be by the Street Division since the warranty
period has expired and concurrence must come from the Street Division. *
Be assured, Mr. Morrison, that all calls received by this office are returned within a
day or two. If you placed calls and received no response, we will look into where the
breakdown occurred to insure similar problems do not happen in the future. We
apologize for any inconvenience to you over this subject.
Please contact this office at your convenience to set up a meeting with us so we can
resolve your concerns.
Sincerely,
ADDISON L. CHRISMAN IV
Engineering Inspector
ALC/sf
MORRISON.DOC
o Incorporated Att-gust 11, 1890
Sister r International — Hekinan, Japan
1 8 9 0 - 19 q —
CITY OF EDMONDS
250 - 5TH AVE. N. - EDMONDS. WA 98020 - (206) 771-0220 - FAX (206) 771-0221
COMMUNITY SERVICES DEPARTMENT
Public Works 9 Planning - Parks and Recreation * Engineering
July 12, 1994
Copy
Charlie Morrison
19823 - 80th Pi. w.
Edmonds, WA 98026
Re: 200th Street S.W. Walkway Project E9DB
Dear Mr. Morrison,
LAURA M. HALL
MAYOR
As requested, this letter is to let you know what action will be taken to fix an area of
your driveway approach (in City right-of-way) where the asp halt has popped out.
Although the contractor of the subject project did the paving, the warranty period has
expired. Since we missed the problem during the follow-up inspection, prior to the
warranty expiration, we will have the City crew do the repair.
During the telephone conversation with your wife yesterday, we explained to her what
the crew was going to do to repair the asphalt. In talking with the field supervisor, he
stated the repair work will be done this week.
If you have any questions, please call me at 771-0220, extension 324.
Sincerely,
ADDISON L. CHRISMAN IV
Engineering Inspector
A
7//
MORRISON.DOC
Incorporated August 11, 1890
—CITY OF EDMONDS Office of the Mayor
Laura M. Hall
CERTIFIED MAIL . ' STREET FILE
February 9,1995
Charles Morrison
19823 80th Place West
Edmonds, WA 98020
RE: REAR DRIVEWAY, YARD, AND STEPS
Dear Mr. Morrison:
r- r 1� � -',' - .. , , '.
-4
In response to your letter of January 10, 1995, 1 have discussed your concerns with Acting
City Engineer Jim Walker and Community Services Director Paul Mar. I am convinced that'
staff has done everything. possible to correct the problems in your rear driveway, yard, and
steps.
Mr. Walker has had several conversations with you about the work that was done by the
private contractor for the City, and staff has been out to your property to investigate your
complaints. There is nothing more we can do. Due to the lervgth of time since that work
was completed, and the fact that a private contractor did the work, we feel the only
recourse at this time would be to'file a claim. I believe Mr. Walker has already forwarded
claim forms to you.
I am sorry I cannot respond to you in a more positive, satisfactory way. If you need more
information about filing a claim, please feel free to contact Rhonda March, our City Clerk,
at 775-2525. 1
Sincerely,
Laura M. Hall, Mayor
CIT� OF EDMONDS
LMH/dm
c: Paul Mar, Community Services Director
j
Jim Walker, Acting City Engineer
Rhonda March, City Clerk
WinWord6\Com.mSrvc\ Morrison
0 Incorporated August 11, 1890 0
505 Bell Street - Edmonds, WA 98020 * (206) 775-2525 0 Fax (206) 771-0221
go _I 9 c�
October 5, 1994
CITY OF EDMONDS
250 - 5TH AVE. N. - EDMONDS, WA 98020 - (206) 771-0220 - FAX (206) 771-0221
COMMUNITY SERVICES DEPARTMENT
Public Works 9 Planning * Parks and Recreation e Engineering
r 'V�Charlie Morrison
19823 80th PI W
Edmonds, Wa 98026
Re: 200th St SW and 80th Ave W Sidewalk Project - E9DB
Follow-up to Phone Conversation on 9/29/94 Regarding
Rear Driveway ior 19823 - 80th PI W.
Dear Mr. Morrison,
LAURA M. HALL
MAYOR
.!,n J-J to /r, /7 �
I have attached sections from the project contract documents relating to damage to private
property and asphalt concrete pavement. Most of the specifications on asphalt pavement are
found in the WSDOT 1991 Standard Specifications. You can review a copy of the standard
specification in our office at 250 5th Avenue North. Copies of the 1994 Standard
Specifications and possibly the 1991 edition are available for purchase at the WSDOT office at
15700 Dayton Avenue North in Seattle.
Our last call was the first time Lyle or I have heard you state that you did not give the
contractor permission to enter your property. Lyle stated that you had discussions about
extending a thin overlay of asphalt all the way up the driveway to keep a consistent appearance
and eliminate the possibility of ponding where the new paving stopped. Lyle also noted that
you allowed the contractor to modify the asphalt at the connection to your stairway to provide
a smoother transition. City policy is to not allow contractor or City crews to work on private
property without the permission of the property owner.
I have al ' so attached page 1-60 of the WSDOT specifications and page 1-7 of City
Modifications to the Standard Specification, which cover Protection and Restoration of
Property. Although you indicated you are not willing to file a claim, a claim form is attached
for your use. If you do decide to file the claim, please return ' it to the City Clerk at 505 Bell
Street. If you have any questions, please call me at 771-0220.
Sincerely,
gr'v"" emv&
JAMES C. WALKER
Assistant City Engineer
JCW/sf
Attachments
MORRISNIDOC
Incorporated ALigust 11, 1.890 e
Sister Cities International — Hekinan. Japan
1-07 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC
The Engineer will not pmuit the area of excavation, borrow, and embankment Work
to exceed the Contractor's ability to meet the schedule for fmish grading. mulching,
seeding, and other permanent erosion control work.
Clearing and grubbing, excavation, borrow. or fill within the right of way shall never
expose more than 750.000 square feet of erodible earth, unless the Engineer approves
otherwise, Ile Engineer may increase or . decrease this 750,000-square-foot limit in light
of project conditions.
Ile Engineer may require temporary control measures if it appears pollution Or
erosion may result from weather, the nature of the materials, or progress on the work. 1h,
Engineer may also require permanent erosion control work to be done with Dr
immediately after grading.
When temporary control devices are no longer needed, the Contractor shall remove
them and finish the areas they occupied as the Engineer directs.
Nothing in this section shall relieve the Contractor from complying with other
contract requirements.
If done according to the approved plan or the Engineer's orders, temporary water
pollution/erosion control work will be measured and paid for.
1. At unit contract prices if the work differs little from specified contract work. or
2. By force account, Section 1-09-6, if not covered by contract items -
For the purpose of providing a common proposal for all bidders. the Contracting
Agency has estimated the cost of "Temporary Water Pollution/Erosion Control" and has
entered the amount in the proposal to become a part of the total bid by the Contractor.
The Contractor shall bear full responsibility for temporary water pollution control in
all sources of material, disposal sites. and haul roads the Contractor provides. All costs
for this work shall be included in the various unit prices for materials obtained from or
hauled to Contractor -provided sites -
Erosion control items named in the contract shall be considered permanent control
measures and paid for at unit contract prices.
1-07.16 Protection and Restoration of Property
1-07.16(l) Private/Public Property
The Contractor shall protect private or public property on or in the vicinity of the
work site. The Contractor shall ensure that it is not removed. damaged, destroyed. or
prevented from being used unless the contract so specifies -
Property includes land, utilities, trees, landscaping, improvements legally on the
right-of-way. markers, monuments. buildings, structures, pipe, conduit. sewer or water
lines, signs, and other property of all description whether shown on the plans or not.
If the Engineer requests in writing, or if otherwise necessary, the Contractor shall
install protection, acce . ptable' to the Engineer. for property such as that listed in the
previous paragraph- Ile Contractor is responsible for locating all property that is subject
to damage by the construction operation.
If the Contractor (or -agents/employees of the Contractor) damage, destroy, or
interfere with the use of such property, the Contractor shall restore it to original
condition. ne Contractor shall also halt any interference with the property's use. If the
Contractor refuses or does not respond immediately. the Engineer may have such
property restored by other means and subtract the cost from money that will be or is due
the Contractor -
Page 1-60
Class 0 trench backfill - 9506 ASTM D 1557 or 9506 WSDOT
test Method No. 606
Class C trench backfill - 90% ASTM D1557
Soil embankment - 95-6 ASTM D 1557
Granular embankment - 95% WSDOT test Method 606 or 95%
ASTM D1557
For any other materials not addressed in this Section*,
Chapter 9 of the WSDOT Construction Manual shall- be
followed.
1-06.2(2) Statistical Evaluations of Materials for Acceptance
Delete 1-06.2(2) except Paragraph C.
1-07 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC
1-07.1 Laws to be Observed
Add: The Contractor shall observe all ordinances,
codes, and permit requirements of the City.
1-07.2 State Taxes
Add: Sales tax shall not be included in bi'd items and
shall be paid by City when applicable at the time of
progress payments.
1-07.9 Wages
Add: The Contractor shall pay all required fees
established in WAC 296-127-045 and consider said fees
incidental to the project.
1-07.11(3) Delete
1-07.11(4)
Delete
1-07.11(5)
Delete
1-07.11(6)
Delete
1-07.11(7)
Delete
1-07.11(9)
Delete
1-07.11(lo)
Delete
1-07.16
Protection and Restoration of Property
1-07.16(l)
Add: In the event that damage occurs, the claim for
damages are filed by the individuals, and the City will
request that the Contractor give evidence that he has
requested his insurance company make personal cbntact
with the claimee. Any settlement for insurance claims
shall be strictly an act restricted to the claimee, the
Contractor, and his insurance company.
1-7
March 12, 1992
4
0
CITY OF EDMONDS
Modifications to Divisions 3 through 9
The -following technical specifications shall be modified, clarified, or
superseded as described below.
5-04 ASPHALT CONCRETE PAVEMENT
5-04.3(4) Rollers
Pneumatic tire rollers shall not be used unless
specified in the Special Provisions.
5-04.3(17) Paving Under Traffic
Open trenches within the traveled way or auxiliary lane
shall have a steel -plate cover placed over them. A
wedge of suitable materials, if required, shall be
placed for a smooth transition between the pavement and
the steel plate. Warning signs shall be used to alert
motorists of the presence of the steel plates.
5-04.5 Payment
Payment shall include tack coat as being incidental to
the bid items. Cold patch or temporary patch as
directed by the Engineer shall be paid for a two (2)
inch thickness per unit measure as stated in the
proposal.
6-02 CONCRETE STRUCTURES
6-02.3(l) Classification of Structural Concrete'
class 3000 concrete, minimum 5 112 sack (94 pound sacks)
mix, shall be used for all concrete work, including
extruded curbs, retaining walls, and small structures.
6-02.3(6)A Weather and Temperature Limitations
Protection of Concrete
A clear, not white, curing compound shall be brushed or
sprayed on all exposed concrete immediately after the
finishing work. Other protective measures against
temperatures, including wind.chill factor, below 40
degrees F, and against potential damage due to weather,
are still required.
6-02.302-13) Co nstruction, Trowel, and Expansion Joints
M-1 June 5, 1992
the utility adjustment be left overnight without an asphalt
patch. All patching work shall be performed solely by the prime
asphalt contractor responsible for the overlay work. Patching
work is subject to rejection and complete removal if it does not
match the texture and smoothness of the new overlay pavement.
10) Adjusting Manholes, Cleanouts and Catch Basins to Grade
All manhole and cleanout adjustment shall be accomplished after
the final roadway pavement operation is completed as expediently
as possible (see Section 1-05.11a, Substantial Completion) but
shall be raised prior to walkway paving. The existing castings
and lids shall be brought flush with the surrounding finished
pavement surface and an asphalt patch consisting of Class uGII ACP
per Manhole Adjustment -Detail shall be constructed.
10a) Water Valve Boxes
Existing water valve boxes consist -of cast iron ' two-piece
slip -type boxes with covers. Adjustment'requires raising ihe
upper s - ection of the valve box to final grade. Additional riser
sections may be required to perform the adjustment. Any loose
pavement or other debris will be kept from dropping into valve
box and interfering with the operation of said valve. The
Contractor shall remove any and all debris from the . adjusted
valve boxes to ensure such operational condition.
10b) Adjust Survey Monument Case and Lid to Grade
Survey monument cases shall be adjusted to the finished grade of
the proposed asphalt overlay surface per the standard details.'
11) Pavement Grinding or Removal
Grinding or removal of the existing asphalt concrete pavement
thickened edge and other road surface is required'as shown on the
contract drawings. Grinding will also be required at each end of
the project and at side street intersections. Grinding width for
thickened edge is three (3) feet and depth shall be to existing
road surface. Grinding depth of side streets shall be one and
one half (1 112) inches. Asphalt grindings from this project may
be used as part of fill in lieu of crushed rock underneath the
sidewalk.
12) Asphalt Concrete Pavement Materials
The overlay shall be Class "B" "modified" asphalt concrete
pavement (AR-4000) consistent with the material specifications
identified in Sections 9-02 and 9-03 of the standards.
"Modified" shall be interpreted that the aggregate size shall be
on the finer end of the size range required for Class "B" asphalt
concrete pavement. Minimum compacted thickness shall be-1.51, for
each lift as noted in the plans.
SP-4
Where indicated in the plans, or as directed by the Engineer, the
Contractor shall feather and shim street surfaces,, walks, or
driveways within street improvement areas to an extent that
provides a smooth -riding connection and expeditious drainage flow
to -or from the newly pav'ed surface. Shimming and feathering, as
required in the plans, shall be accomplished by raking out the -
oversized aggregates from the modified Class "B" mix.
Measurement shall be per ton of modified Class "B" asphalt
concrete in place as determined from truck weight tickets
delivered to inspector on job site. Tickets for walkway shall be
kept separate from all other tickets.
13) Reconstruct Vertical Curve: Sta 14+00 - 17+00
Includes all excavation, -grading, compaction, haul and disposal
of material for construction of vertical cuve and reconstruction
of driveways as specified on the plans; also includes prelevel of
driveways. Contractor shall set new survey monument and case in
concrete to grade at intersection of 83rd Pl. W. and 83rd Ave. W.
with 200th St. S.W.
14) Measurement.and Payment Summary
The following is a general summary of pay item descriptions
listed in the bid proposal and defined in the contract document.
All pay items shall include all costs of equipment, materials,
and labor required to make the installation complete per the
plans, details, and specifications. Imported materials shown on
the details shall be considered incidental to the appropriate bid
item.
.Measurement for storm pipeline on a unit cost basis shall be the
actual footage from centerline of catch basin to centerline of
catch basin. Measurement for imported bedding shall be the same
as for pipe. Patching shall be the actual square footage
measured.
Item Description
Mobilization Bond and insurance, site move -in.
Traffic control Conform with MUTCD and approved
traffic control plan, detour
planning and set-up,.flaggers,
signs, barricades, lights,
coordinate with Maplewood
Elementary School.
Storm sewer pipe Excavation and removal of existing
pipe, pipe., imported bedding and
native backfill, compaction as
required per backfill, disposal of
waste materials, dewatering,
SP-5
City of Edmonds
Claim for Damages Form
Please take note that
'-io resides at
..,ailing address
residence address for six (6) months prior to date of this claim
, home phone # work phone # claims damages
of and from the City of Edmonds in the sum of: $
This claim for damages arises out of the following circumstances listed below.
Date of Occurrence: Time:
Location of Occurrence:
DESCRIPTION:
1. Describe occurrence explaining the nature of the defects or acts of negligence causing damages.
(attach an extra sheet for additional information if needed)
2- Provide a list of witnesses, if applicable, to the occurrence including names, addresses, and phone numbers.
3. Attach copie
License Plate #
Driver:
Address:
Phone:
Passengers:
Address:
of all documentation relating to expenses, injuries, losses, ancl/or estimates tor
"Additional Information Required for Automobile Claims Only **
Driver License # Type Auto _ (Year) _ (Make) _ (ModeQ
Owner:
Address:
Phone:
Address:
Owner's Insurance Co.: Policy Number:
Have you submitted a claim for damages to your insurance company?
Yes No
** Note: This form must be signed and notarized **
1, , being first duty sworn, depose and say that I am the claimant for above described; that I
have read the above claim, know the contents thereof and believe the same to be true.
of Washington
County of (Claimant's Signature)
Subscribed and sworn to before me this day of ---- ---,lg
iTo-tary Public in and for the State of Washington
c1mdmgfm.doc 1V28/93
CITY OF EDMONDS
250 - 5TH AVE. N. - EDMONDS, WA 98020 - (206) 771-0220 - FAX (206) 771-0221
COMMUNITY SERVICES DEPARTMENT
Public Works * Plannino e Parks and Recreation * Ennineerinn
9 0 - 19
September 22, 1994
cr-,
Charlie Morrison
19823 80th PI W
Edmonds, Wa 98026
Re: 200th St SW and 80th Ave W Sidewalk Project - E9DB
Rear Driveway for 19823 80th PI W.
Dear Mr. Morrison,
LAURA M. HALL
MAYOR
Q � �a3
This letter is a follow-up to our conversation on August 3, 1994 at your property
regarding your driveway. As I told you in our phone conversation several days later,
I needed to speak with Noel Miller, Public Works Supervisor, regarding any work the
City's Public Works Division would do on the project and was just able to meet with
him last Friday.
A summary of the problems you perceived as needing to be resolved with the driveway
when we met on August 3, 1994 were:
1. Inadequate drainage of water off the driveway.
2. Poor asphalt surface quality.
3. Unacceptable slope in walking path between stairway and driveway area.
The City does not see any problems with the asphalt surface quality or with the slope
between the stairs and driveway. Public Works can assist with the buildup of water off
the edge of the driveway by installing a drainage inlet along the north edge of the
driveway west of the sidewalk.
If you believe the contractor caused you damage by his action in 1992, you can file a
claim form with the City. Claim forms are available from the City Clerk. Please
contact me if you would. like the City to install a drainage inlet in the right-of-way
behind the sidewalk next to your driveway.
Sincerely,
JAMES C. WALKER
Assistant City Engineer
JCW/Sf
MORRISON.DOC
- 0 Incorporated Atigtist 11, 1890 a
Sister Cities International — Hekinan, Japan
CITY OF EDMONDS
250 - 5TH AVE. N. - EDMONDS, WA 98020 - (206) 771-0220 - FAX (206) 771-0221
COMMUNITY SERVICES DEPARTMENT -
Public Works @ Planninn o Parks and Recreation 9 En ineerin
Q — to it
9 0
July 19, . 1994 , ropy
Charlie Morrison
19823 80th PI W
Edmonds, Wa 98026
Re: 200th St SW and.80th Ave W Sidewalk - Project E9DB
Rear Driveway at 19823 80th P1 W.
Dear Mr. Morrison,
LAURA M. HALL
MAYOR
71 1/
t
This letter is a follow-up to our conversation last week regarding your driveway. The
Assistant City Engineer looked at the driveway and did not see any structural problems
with the asphalt surface. The edge cracks previously noted are most likely the result
of extra asphalt placed beyond your original driveway.
In order to conclude the subject issu*e,' would you please send us a letter stating exactly
what you think has yet to be resolved to your satisfaction . We would like to set up a
meeting with you, Bill Stroud, who is the Supervisor of the Street Division, and
Engineering to go over your concerns. The reason for the involvement of the Street
Division is that any work to be done will be by the Street Division since the warranty
period has expired and concurrence must come from the Street Division.
Be assured; Mr. Morrison, that all calls received by this office are returned within a
day or two. If you placed calls and received no response, we will look into where the
breakdown occurred to insure similar problems do not happen in the future. We
apologize for any inconvenience to you over this subject.
Please contact this office at your convenience to set up a meeting with us so we can
resolve your concerns.
Sincerely,
ADDISON L. CIIRISMAN IV
Engineering Inspector
ALC/sf
MORRISON.DOC
, Vl"N'
0 Incorporated ALIgUSI 11, 1890 0
Sister (- ; International — Hekinan, Japan
8 9 0 - I g') -
CITY OF EDMONDS
250 - 5TH AVE. N. * EDMONDS. WA 98020 - (206) 771-0220 FAX (206) 771-0221
COMMUNITY SERVICES DEPARTMENT
Public Works * Planning . * Parks and Recreation * Engineering
July 12, 1994
cuppo%
14, 14 COPY
Charlie Morrison
19823 - 80th Pl. W.
Edmonds, WA 98026
Re: 200th Street S.W. Walkway Project E9DB
Dear Mr. Morrison,
LAURA M. HALL
MAYOR
.4 A
As requested, this letter is to let you know what action will be taken to_.fix an area of
your driveway approach (in City right-of-way) where the asphalt has popped out.
Although the contractor of the subject project did the paving, the warranty period has
expired. Since we missed the problem during the follow-up inspection, prior to the
warranty expiration, we will have the City crew do the repair.
During the telephone conversation with your wife yesterday, we explained to her what
the crew was going to do to repair the asphalt. In talking with the field supervisor, he
stated the repair work will be done this week.
If you have any questions, please call me at 771-0220, extension 324.
Sincerely,
ADDISON L. CHRISMAN Iv
Engineering Inspector
MORRISON.DOC
0 Incorporated August 11, 1890 *
Sister Cities International — Hekinan. Janpin
Office of the Mayor
CITY OF EDMONDS
. Laura M. Hall
41 .
P v e- Iv F, a
CERTIFIED MAIL STREET FILE FEB 4 1995
ENGINEEvtsN�..
February 9,1995
Charles Morrison
19823 80th Place West
Edmonds, WA 98020
RE: REAR DRIVEWAY, YARD, AND STEPS
Dear Mr. Morrison:
In response to your letter of January 10, 1995, 1 have discussed your concerns with Acting
City Engineer Jim Walker and Community Services Director Paul Mar. I am convinced that
staff has done everything. possible to correct the problems in your rear driveway, yard, and
steps.
Mr. Walker has had several conversations with you about the work that was done by the
private contractor for the City, and staff has been out to your property to investigate your
complaints. There is nothing more we can do. Due to the length of time since that work
was completed, and the fact that a private contractor did the work, we feel the only
recourse at this time would be to file a claim. I believe Mr. Walker has already forwarded
claim forms to you.
I am sorry I cannot respond to you in a more positive, satisfactory way. If you need more
information about filing a claim, please feel free to contact Rhonda March, our City Clerk,
at 775-2525.
Sincerely,
Laura M. Hall, Mayor
CITY OF EDMONDS
LMH/dm
c: Paul Mar, Community Services Director
Jim Walker, Acting City Engineer,
Rhonda March, City Clerk
WinWord6\ComniSrvc\ Morrison
e Incorporated August 11, 1890 0
505 Bell Street - Edmonds, WA 98020 * (206) 775-2525 * Fax (206) 771-0221
STREET FILE
CERTIFIED MAIL
February 9, 1995
Charles Morrison
19823 80th Place West
Edmonds, WA 98020
RE: REAR DRIVEWAY, YARD, AND STEPS
Dear Mr. Morrison:
In response to your letter of January 10, 1995, 1 have discussed your concerns with Acting City
Engineer Jim Walker and Community Services Director Paul Mar. I am convinced that staff has
done everything possible they can to correct the problems in your rear driveway, yard, and steps.
Mr. Walker has had several conversations with you about the work that was done by the private
contractor for the City, and staff has been out to your property to investigate your complaints. There
is nothing more we can do. Due to the length of time since that work was completed, and the fact
that a private contractor did the work, we feel the only recourse at this time would be to file.a claim.
I believe Mr. Walker has already forwarded claim forms to you.
I am sorry I cannot respond to you in a more positive, satisfactory way. If you need more
information about filing a claim, please feel free to contact Rhonda March, our City Clerk, at 775-
2525.
Sincerely,
Laura M. Hall, Mayor
CITY OF EDMONDS
LMH/dm
c: Paul Mar, Community Services Director
Jim Walker, Acting City Engineer
Rhonda March, City Clerk
WinWord6\CommSrvc\Morrison
Z
1�
U
0
U
"i
co
0
Z
0
LU
V)
::D
ce.
0
Cl'& OF EDMONDS
PUBLIC WORKS DEPARTMENT
(F�
RIGHT - OF - WAY CONSTRUCTION PERMIMRjEFT
A. *Address or vicinity of Construction ,
19823 Both PI.W.
0 Owner: C.J. Morrison
Name
19823 Both P1. W.
Mailing Address
3dwnft' wash 9eo2o
City, . State, Zip Code
9 Contractor
oicis olympic Inc.
Nay
.0 . BOX )LBO
Permit No. f 2 -2IO-1
Issue Date 7- 9- 1
0 Permit Issued To: 01c'Ls Olympic Inc.
9 Type of Work to be Done:
9 Work in Connection W>h-<
El Sub or Plat ingle Family
El Comml. / Ind. El Apt. Condo.
9 Pavement Cut: 0 Yes El No
223-01 OLDSO 317 BO
Mailini
,hAddress Sta�n5j�umber
1'y mlyobd� jqash 98036
City, State, Zip ode Telephone Number
NO WORK TO BEGIN PRIOR TO PERMIT ISSUANCE.
B. APPLICANT TO READ AND SIGN
INDEMNITY: Applicant understands and by his signature to this application, agrees to hold the City of Edmonds harmless
from any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made
against the City of Edmonds, or any of its departments or employees, including or not limited to, the defense of any legal
proceedings including defense costs, court costs, and attorney fees by reason of granting this permit.
Upon issuance of this permit, the contractor is responsible for workmanship and materials for a period of one year
following the final inspection and acceptance of the restoration by the Engineering Division.
Funds held from the Security Deposit (estimated restoration fee) will be held until the final street patch is comp leted, at
which time a debit or credit will be processed for issuance to the applicant.
Work is to be inspected. Restoration to be in accordance with City Code. Traffic Control.to be in accordance with Traffic
Section of City Code. Street to be kept clean at all times. A 24 - hour notice is required for inspection by Engineering.
Call 775-2525, extension 220.
I understand that this permit mw
Signatur V
Owner or
site for inspection purposes at all times.
Date
THIS PERMIT MUST -BEPOSTED AT THE JOB SITE FOR INSPECTION PURPOSES
CALL DIAL - DIG PRIOR TO BEGINNING WORK
C. Issued By:
Time Authorized:
Special Conditions:
Ammendments:
Void after
Permit Fee:
Security Deposit:
Receipt No.: —
Fund I I I Fee:
Street Cut Dimensions
X
NO,WOR.K TO BEGIN PRIORJO PERMIT ISSUANCE
Eng. Div. December 1978
31
FIELD INSPECTION NOTES (Fund 111 - Route coT)v to Street"Dept.
Comments:
Diagram:
Contractor called for inspection Yes NO
T
,Ajork DisaPproved By: Dat Bv: Date:
Work AL)proved By: Date:
Inspector:
Ena. Div. December 1978
APPLICATION
EYWI P! ANT
for
The City of Edmonds SIDE SEWER PERMIT
EW CONSTRUCTION REPAIRS Ej
Lil 6:-- 4 1. = o r5hl, I - /
f
OWNER -4- ...... I I a,
...... Vi. .......................................................
ADDRESS ................................
-k
N
c�
I
SEMENT No.../
47e
CONTRACTOR z.7n ........ . . ....... ...... C . ....... PERMIT No.' F
....... ........... ......... 1�t�
LEGAL DESCRIPTION: LOT No. 3 ............................. ........... BLOCK No . ......................................
ION M.4L,0 Z
-� In,* 0 4 Q
NAME OF ADDIT ..................................................... d
................ ...........................................
Approved:
................ By ........................
DATE
NOTICE:
No warranty of accuracy.
The information'shown on the attached
map(s) was compiled for use by the City of '
Edmonds, its Employees and Consultants.
The City of Edmonds does not warrant the
accuracy of anything set forth on these
map(�-). Any person or entity -req uesting a
copy should conduct an independent
inquiry regarding the information shown on
tKe -map(s), Including, but not limited to,
the location of any sewer stub shown. Su.ch
sewer stubs may or may, not exist and may
or may,not exist at the location shown.
Neither the City of Edmonds nor its
emp-l-o-yee-s o-r office-rS shall be Hab-11-e for the
information given on this map(s), nor for
any one representation provided based
upon said map(s).
CITY OF EDMONDS
CIVIC CENTER — WATER -SEWER DEPARTMENT Can PR*sPect 6-1107 when work
Is ready for Inspectjon. (No Impec_
ti— Saturday, Sunday or hotIda".) N2 1695
SIDE SEWER PERMIT
ADDRESS .................................. �!t_._j3.Q_tjj._pj&ce ... West
OWNER ........ --- !j0.rr.i.So.n --- ......... ................................. cowp.AcToR.4�ied Septic Service
................ . ....................................................
Pennission Is granted _.MarCh__l ..............
........... 19fiT., for ...................... days, to REPAIR or CONNECT a side sewer
with City Sewers in accordance with aPplication on file and governing ordinances.
ATTENTION IS CALLED TO THE FOLLOWING:
NOTE No. I —The owners of the Property may obtain a permit to construct sewer inside Property line. A licensed Side sewer Contractor must
be employed 10 construct side sewer In street area� Do not cover any portion of sewer before it has been Inspected.
NOTE No. 2—Obtain full Information regarding ordinance 11-16-0340 and Regulations governing side sewers when you get permit.
NOTE No. 3—Top of side sewer must have at least 30 Inches coverage at property line and 12 inches Inside property line;
No bends In grade sharper than % will be Permitted. minimum grade of 2%.
0 E No. 4—Trenches In street must be water settled and surface of street restored to original 'Condition. Contractors shall be responsible for
) failure due to Improper work which may develop within one year of completion.
NOTE No. 5—It is unlawful to alter or do any other work than is provided for In the permit, or to do any work on the main sewer or. Its ap-
) purtenances except to Insert the pipe into the wye.
J)!:!"T. OTCOLOWT
_DPILDLING. . .... .
Street PdFht-oE-1-:aNr Eaistinr_ Tu JA
Access Easmnits Existing
%
CL: Utility 1-ascinont F-dstina
Uo.
11 Lot Per Subdivision PI at Assessor 7 iop
Sitc 'Plarl (Tccl:cd for Accurac-11, Ari- 7 —1
Vnclonround 11,cod.
P(f 11(au
Yxistin- 1�',itcr "ain Sj.�-c
llydnil,L Size
7 C
r
Dctectnr (-Iicch Pcciti.rcd
L"j) "I,
Sc,ptic Tan!"
Sauj- ta ry R �.- ty.
Sido Sc,...:cr Avdlabilit�r
c,,-cr Co, C�iajl Fcc pecluil-CO
)cn Dit(j)
CIII.VC17t P.C70ITt-.L.,
catc"I Misill !,c(alirod
nn i n
01'f,
r, L.) -) -�4
r
a
,-ito, rl-cla (-111-cl-c
soil (-C)11(,Iit.iojs jid 1'f'zitor Hold Chodxd
1", .0 it,(),,
RcN'j. c.."
I c "o.
Pato
TjOic.-I.I.m.- �nitc Plnn
Ilia Plml
rr, I ',IV i 71 111-r 11, -rc(I
ftirb
and
C',itter ired
Sidcn
- rall-
Pcquircd
Wil)
c
Put
for Privoway Rcquircd
r
o ",2
pi ojjt-ojl-,,:�I�
- Construction Pc Zemdrod
_uCtIon PC Z(11 ro'
J',ond
JjCr�jlj
I
1-(�(j for ic Iimirovcments
r "I p - r
t 1.- 0 c t
zc
10 sj.(,n Requirccl
-I; Pcquirccl
Othcr sinn.in�
Pre 116 Sitc Insncction n.-adc on
BY: SCI-I-C r-I
Strcct
ElIgincCrin
Special Poquircm.cmts listccl in mem.o to 11"Itilding Pq-) nr t m t.
Date
-C
-;II.S f.il]_C(.1 ill on ],,,14
p: ca ion
-1)"Itc
P cav'r; 31-5 Staripc(I n-nd ".70tatic'.1s I(Ic
Date
Ay"pravc(I by Public 1"b"Tc; I-xparti"Iclit
CITY OF EDMONDS
PUBLIC WCFW — EWINEERIW,
ACTION REPORT
N9 1061
STRE�T FEL[E
SUSPENSE DATE:
Date: Time: CP 1%30 -File #
Attachments: Q�gYes
SUBJECT: 1?4v r___lNo
'OW4 IAJ4 14�eO,64 C-,'V'7 06/ We
0/l/ leo"9-1040140
REQUESTOR: NAmE: M01tZ1Q1!50AJ
ADDRESS: 3
HONE: :72 2 Co - 5/ZZ-
REQUEST RECEIVED BY:P
TELEPHONE
CONTACT IN OFFICE
OTHER:
RECEIVED BY:
ROUTE TO:
u
M
MWIA M �M_,; �
rz M
0 'A
0 W.
0
um����=Mnw
um
MMMM���M=
,am
MMWM���==
ACTION: /,f/
,57//g&
/IL&
777� Iffilele7-Pl'- 7hLe,
Action Completed/File