200 7TH AVE N.PDF111111111111
6893
200 7TH AVE N
Imp
TAX ACCOUNT/PARCEL NUMBER: tk-'!t�IJU)62t R2721
BUILDING PERMIT (NEW STRUCTURE):2wsml5c)
COVENANTS (RECORDED) FOR:ZM5042
CRITICAL AREAS: DETERMINATION: El Conditional Waiver F] Study Required F] Waiver
DISCRETIONARY PERMIT #'S:
DRAINAGE PLAN DATED: 2, 625
PARKING AGREEMENTS DATED:
EASEMENT(S) RECORDED
PERMITS (OTHER): MU — I I � I
�mlw�
PLANNING DATA CHECKLIST DATED:
SCALED PLOT PLAN DATED:
SEWER LID FEE $:
SHORT PLAT FILE:
SIDE SEWER AS BUILT DATED:
SIDE SEWER PERMIT(S) #:
GEOTECH REPORT DATED:
STREET USE / ENCROACHMENT PERM
WATER METER TAP CARD DATED: Z-/
OTHER:Fr'1,w1D ( pj��
LID #:
LOT:. BLOCK: '90
L\TEMP\DS'rs\Fomis\Street File Checklist.doc
PLANNING DATA
SINGLE FAMILY RESIDENTIAL
STREET FILE
Name: R'dl
I Date: I 01/a (I I /-q IQG
Site Address: ;Zoo - 74� Ave- Al
Plan Check #: laocro - I I IGO
Project Description: T-(N4bA q I W \, ---,ocd -0e,,Nce, -aAv,\n ?Orklo.-\ o- CAD e4�1k�n
ee AIW corne�r 0 (Ase ;
=Pr-e A=
Reduced Site Plan Provided: NO)
0>
Zoning:
I Q!E,- r,.
Map Page: ao��
Corner Lot: NO)
Flag Lot: (YES
Critical Areas Determination #: C-Pk-QOOq- 0157
El Study Required
JwWaiver
SEPA Determination: k�ce,�4A
Exempt
Needed (for 500 cubic yards of grading or site within 200 feet of Puget Sound or Lake Ballinger)
0 Fee 0 Checklist 0 APO List with notarized form
Required Setbacks
Street-
q0
Side
A6 5'
Side:
RAMM
Qp
Actual Setbacks
Street:
rine'e-
Side- NI
e-r;:�144 �0 6p-
Side:
Rear:
El Detached Structures: dor_ �e�oczn,
X Rockeries: Ext'aA;r1l
Fences/Trellises: Ace_ e."
El Bay Windows/Projecting Modulation: t4c,,Ne-i�:NxcLz�
El Stairs/Deck: No,,e,
Buildin Height
Datum Point: N /A
Datum Elevation:
VA
I
Maximum Height Allowed: G
Actual Height: T -t!��Ooc-
Other
Parking Required:
Parking Provided: No 't�e,
Lot Area:
\1J
Maximum Lot Coverage: 35% Proposed: \6C
Lot Coverage Calculations:
ADU Created: (YES X9
Subdivision: c;l!, W
Legal Nonconforming Land Use Determination Issued: (YES 0
Comments
Ferkc-e- rvvl!!N� V-)�eJr kcAlz� -vne_ -6x,,
Nor\.
Plan Review By:
Planning Data Form 04-11-06.doc
0 0
PLANNING DATA
NAME: 6��-A QCI.SS DATE: /0 *
SITE ADDRESS: v &A�P - -7 Al PLAN CHK#: (�14 - 5'4 4
PROJECT DESCRIPTION: lVdw 94e 4 �Ocw Act'A-
V V
REDUCED SITE PLAN PROVIDED?: &J/ No)
MAP PAGE: ?0 3 CORNER LOT: (Yes / No FLAG LOT: (Yes / No)
ZONING:. 'P � '- & — CRITICAL AREAS DETERMINATION #: 15 7
LlStudv Reouired:
aWaiver
L] Conditional Waiver
SEPA DETERMINATION:
Ll Fee
L1 Checklist
Ll APO list w/ notarized form I&S7.
Ll(Needed for 500 cubic yards of grading, Shoreline Area- site wit9in 206ft. of Puget Sound or Lake Ballinger)
L&Exempt
SETBACKS:
Required Setbacks: Bo 51-,
-7- fy. Street: 2z, Left Side: 5' Right Side:— 2b' Rear: 5-'
Actual Setbacks: ZZ, I
Street: 2,0'-* Left Side: �& �,10� Right Side:— ;-70' Rear: 5-'
Street map checked for additional setback required? (W�W No / DNA)
N--111 N-1-4
LJ DETACHED STRUCTURES:
LXRoCKERIES:
LJ FENCES/TRELLISES:
3
I-J BAY WINDOWS / PROJECTING MODULATION: a- � Auir - W -�-
O'STAIRS / DECKS: -"�',--A Ae". f-� St-bwvf,- 6r.t r-ejwv-e.( , vAr-imt<
PARKING: Required: 2- Actual:
LOT AREA: 6 5 3 4
LOT COVERAGE:
Calculations:
j1KW
BUILDING HEIGHT: -7"' A"( IV. Datum Elevation: /Go,
Datum Point:—*,t-^;,ik on
Maximum Aflowed.: 11:1,S) —ActualHeight: Z9
A.D.U. CREATED?: 0 C—P I0. k-
SUBDIVISION: Z" 39 1- 4o k--e .,h 4&*b&a,-y i, 3�9
LEGAL NONCONFORMING LAND USE DETERMINATION ISSUED: (Yes /
OTHER: gr"A61 rxr%,\o- be cv-V--miH4 �-, S-'-6Ab4j -14- j
-41, 64%4" 4!,� &*� A 5ozj- (7-) 0 W 3' . b.+ t"j-
r0i-A . AAL-X4� 0� P-6 C4,0,vc. W Ujj f�,, 3AtZ�-.
Plan Review By:
NewBPP1anningDataForrn.D0C
j4j 0 V L.> fjo S, > 006-UU f - rr� C. I-
F>Lo -r A W
5TREE-11' FILE 9VE
FEB 0 8 Z035
+ %1) PERMIT COUNTER
AJND AID ADDRESS SM &=Wpa
el ALL UP090 SURFACES TO
MSTRUCTION
TEIMPORAM Ck 6
§E MERE-D WITHIN 2 DAYS
C-31TIMINCEFF REC)MED
IS)
rz
C)
(0
4j
o
>Ij
S
31
cc
U) Lu
uj
Z
0
I - u ;_;p
LLJ
a_ ca
Cl-
L? ti
Lu
Uj LLJ
F-
Ln C30
Lu CV2 'wt
0 cc =
L) 20' :
Co.
INATER EY-�Ap-
4SPECTI 'EQ'D
lot
425 7?1
-T
(00
Zone COMO Fla&,
N,
Setbacks Rggtfired
Actual
Front
Sides
lz
Rear
Other
Hei*
U AL-0-1
JAY
#0
CL (Ao oj, jj
4 101-'�
,t,LL ))CIO
tj�'Jloti
" L)
15,6sist 1�p
OA
(\PAA-
/00-
1AINS NOT
puc jW-�
E.D INTO
mpokf6H-i
p
09,
0 1
00
too.
APPROVED BY PLANNINC
OWt4ER/Col*,*:',','-,i,��.,"i'UR IS RESPONSIBLE FOR
EROSION CONTROL AND DRAINAM
STREET FILE
Dennis M. Bruce, RE.
M.S.G.E- M.B.A. Geotechnical /Civil Engineer
April 14, 2004
K-g-9,
H V
City of Edmonds LC-1
c/o Aaron and Chloe Cerutti
20223 p.ailh pl. W FED 0 0
Edmonds, WA 98026 P-�V!"
Subject: Geotechnical Evaluation - Foundation Recommendations
202 71h Ave., Edmonds, Washington
Proposed Gerutti Residence
This engineering roport presents the results of a geoteul u iiQal evaluation of the
Aaron and Chloe Cerutti property at 202 7 1h Ave., Edmonds, Washington. This
evaluation was required dLJ8 to nwnpr nnncerns, as well as City of Edmonds
requirements.
REFERENCES:
• Property lot layout (furnished by owner)
• Proposed Residence Plans - Site Plan (furnish.ed by owner)
• Photographs dated April 6, 2004 by D. Bruce, P.E.
BACKGROUND:
The overall property at 202 7 th Ave. is rectangular in shape and consists of Lot
Nos. 39 and 40, Overall lot dimensions are approximately 60 feet by 110 feet (total).
The majority of the lot itself is essentially flat, with moderate slopes in the right-of-
way at the location of City of Edmonds streets (7 th and Bell).
There are no obvious visual geotechnical problems with the property: no
evidence of slides, no sloughing, or any evidence of erosional degradation.
A City of Edmonds'tr ' eated timber retaining wall exists at the north edge of Bell
St. (at 7 1h Ave.) (see photographs). This timber retaining wall is approximately 4-1/2 feet
tall and shows no evidence of any geotechnical distress: no bowing, no bulging, or any
evidence of erosional degradation . (see photographs). This engineer understands that
City of Edmonds has installed this timber retaining wall and is responsible for its
ongoing maintenance, The wall appears to be in excellent condition with no apparent
problems.
SO/LS - FOUNDATIONS - SITE DEVELOPMENT * INSPECTION - DRAINAGE - DESIGN 6 PERMIT - LEGAL
P.O. Box 55502 - Shoreline, Washington 98155 - (206) 546-9217 - FAX 546-8442
z 050,d !Jeujem monwo <- !VqdL01-ZL so/Lt"
0 0
City of Edmonds
c/o Aaron and Chloe Cerutti
April 14, 2004
Page 2
The other location on . the overall property with slopes is the right-of-way zone
immediately, adjacent 7 th Ave. This engineer estimates that the Slt)pt:: aLijacent the
paved portion of 7 th Ave. reposes at an approximate 3H-1V declination. The slope
contains mature trees, densp shrohbery, and reveals no evidence of any gootechnical
distress: no slides, no sloughing, or any evidence of erosional degradation.
This engineer understands that Aaron and Chloe Cerutti propose to build a
standa�rd single-family residence in the central portion of the overall property with no
cutting of adjacent slopes near toe right-of-way (see owner furnished Site Plan).
EVALUATION.
in order to 31_10ment the existing site. geotechnical information, 3 soil test hOle3
were dug by hand on April 6, 2004 in the likely footprint location of the proposed
residence. All 3 test holes revealed similar sub-qrade conditions. namely:
0" to 6"
6`1015"
15" to 40" (bottom of test holes)
Lawn, roots, and organic silt
Sandy loam, grading to medium dense
sand h gravels
Dense slightly silty sands wit
No water was encountered in any of the three test holes. All te . St hole wall-,
remained vertical and stable. No sloughing or caving occurred.
CORQLUSIONS /_RECOMMENDATIONS:
Based on the findings of this investigation, and experience with similar sites in
at 202 7'�' Ave., Edmonds, Washington is eotechnically.
the area -the property ,, si,.I9le_faIIIily re5irjel-lce, subject to the following*
ppR!oved -for the PFUPQ!St!d Ct:'Iu
0 No excavation or undermining of the adjacent road slopGr
Standard reinforced continuous and spread footings. AIJnw;;hlP bparing
pressure- 2,000 P.S.f. f 35 p.c.f. is recommended for any retaining wall
Equivalent fluid pressure o
desian Drovided'drainage zone is inspected and verified by this engineer.
use friction factor of 0.55 and passive pressure of 3tlu
For retaining wall design,
p.c.f.
e ,
r. Obed !jeujeM monqo -
.WdLO:ZL so/LL/t :Pa^TaOOU
0 0
City of Edmonds
c/o Aaron and Chloe Cerutti
April 14, 2004
Page 3
Geotechnical inspections by this engineer prior to any foundation concrete
placement. I
The proposed structure can be supported on conventional continuous and
spread footings bearing on undisturbed native soils or on structural fill placed above
native soils. See the later sub -section entitled General Earthwork and Stnirfiiml Fill for
structural fill placement and compaction recommendations. Continuous and individual
spread footings should have minimum widths of eighteen (18) and twenty-four (24)
inches, respectively, and should be bottomed at least eighteen (18) inches below the
lower adjacent finish ground surface.
Depending on the final site grades, some over -excavation may be required below
fnofinos to expose competent native soils. Unless lean concrete is used to fill the over
excavated hole, the width of the over -excavation at the bottom must be at least as wide
as the sum of two times the depth of the over -excavation and the footing width. For
example, an over -excavation extending two feet below the bottom of a three-foot wide
footing must be at least seven feet wide at the base of the excavation.
Footings constructed according to the above recommendations may be designed
for an allowable soil bearing pressure of two thousand (2,000) pounds per square foot
(p.s.f.). A one-third increase in this design bearing pressure may be used when
oonsidering short-term wind or scismic loodo. For the above design criteria, it is
anticipated that total post -construction settlement of footings founded on competent,
native snils (or on Mrtirtural fill up to five (5) feet in thickness) will be about one-half
inch, with differential settlements on the order of one -quarter inch.
NOTE: The bearing capacity of 3,000 p.s.f. applies to over -excavated and
backfill conditions. Footings placed on native soils may be designed for 2,000 p.s.f.
Lateral loads due to wind or seismic forces may be resisted by friction between
the foundations and the bearing soils, or by passive earth presisure Anting on the
vertical, embedded portions of the foundations. For the latter condition, the foundations
must either be poured directly AgAinst tindisturbed soil or the backfill placed around the
outside of the foundation must be level structural fill. We recommend the following
design values be used for the foundation's resistance to lateral loading:
Parameter Design _Value
Coefficient of Friction 0.55
Passive Earth Pressure 35.0 P.0-
z L so/ L L
t, !iquiem Monqo <-
0 1 . 0
City of Edmonds
c/o Aaron and Chloe Cerutti
April 14, 2004
Pnge 4
Where:
(1) p.c.f. is pounds per cubic foot.
(2) Passivp Parth prpssurp is compijtpd using thp Pquivalent fluid dpnqity.
We recommend that a safety factor of at least 1.5 be used for desi.qn of the
foundation's resistance to lateral loading.
SLABS -ON -GRADE:
Slab -on -grade floors may be supported on undisturbed, competent native .5615 or
on structural fill. The slabs may be supported on the existing soils provided these soils
can be re -compacted prior to placement of the free -draining sand or gravel underneath
the slab. This sand and gravel layer should be a minimum of four (4) inches thick, We
also recommend usinq a vapor barrier such as 6-mil. plastic membrane beneath the
slab with minimum overlaps of 12 inches for sealing purposes.
PERMANENT FOUNDATION AND RETAINING WALM
Retaining walls back -filled on one side only should be designed to resist lateral
earth pressures imposed by the soils retained by these structures. The following
recommended design parameters arp for w;alls 1pss thnn twplve (12) feet in height,
which restrain level backfill:
Parameter
Active Earth Pressure'
Passive Earth Pressure
Coefficient of Friction
Soil U.nit Weight
Where:
ID-esign Value
3.5 P.C.f.
350 p.c.f.
0.55
125 p.c.f.
(1) p.c.f. is pounds per cubic foot
(2) Active and passive earth pressures are computed'using equivalent fluid
densities.
Fut tesLiaiiired walls which cannot defect at least 0.002 times the wall
height, a uniform lateral pressure of one hundred (100 P.s.f. should be
oddod to the active equivalent fluid pressure).
Of5ed !JOUJOM !VYJZO: ?_ � 90/ L L/ L
0 0
City of Edmonds
c/L) Aw v, I dfld ChlOe Cel.utti
April 14, 2004
p1ge -1)
The values given above are to be used for design of permanent foundation and
retaining walls only. An appropriate safety factor should be applied wlit�ii detiigning the
walls. we recommend using a safety factor of at least 1.5 for overturning and sliding.
The above design values do not include the effects of any hydrostatic pressures
behind the walls and assume that no surcharge slopes or loads will be placed above the
walls. If these conditions exist, then those pressures should be added to the above
lateral, pressures. Also, if sloping backfill is desired behind the walls, then we will need
to be given the wall dimensions and slope of the backfill in order to,provide the
appropriate design earth pressures.
Heavy construction equipment should not be operated behind retaining and
fOLinciation walls within a distance equal to the height of the wall, unless the walls are
designed for the additional lateral pressures resulting from the equipment. Placement
and compaction of retaininq wall backfill should be accomplished with hand -operated
equipment.
Retaining Wall Backfill
Backfill placed wiLhirt eightee') 0 8) inches of any retaining or foundation walls
should be free -draining structural fill containing no organics. This backfill should contain
no more than five (6) percent silt or clay particles and have no particles greater than
four (4) inches in diameter. The percentage of particles passing the No. 4 sieve should
hp hptween twenty-five (25) and seventy (70) percent, Due to their high silt content, if
the native soils are used as backfill, a drainage composite, such as Mirafi and
Enkadrain, should be placed against the retaining walls. The drainage composites
should be hydraulically connected to the foundation drain system. rhe purpose of these
backfill requirements is to assure that the design criteria for the retaining wall is not
exceeded because of a build-up uf llydiutsLatic pressure behind the wall. The
ork and Structural Fill contains recommendations
subsection entitled General Earthwork
rogarding placement and compaction of structural fill behind rptsining and foundation
walls.
EXCAVATION AND SLOPES:
in no case should excavation slopes be greater than the limits specified in local,
state and national government safety regulations. Temporary cuts up to a height of
four (4) feet deep in unsaturated soils may be vertical. For temporary cuts having a
height greater than four (4) feet, the cut should have an inclination no steeper than 1
(Horizorital-Velliudl) ri-om the top of the slope to the bottom of the cxcavation. Under
specific re'commendations by the geotechnicall engineer, excavation cuts may be
modified for site conditions. All permanent cuts into nativP -Soilq should be inclined no
!Vid?-O:z� 90/LL/L :PO^T9Oa8
9 060d !j9uj8M
City of Edmonds
c/o Aaron and Chloo Corutti
April 14, 2004
Page 6
steeper than 2:1 (H.V). Fill slopes should not exceed 2H-.lV. it is important to note that
sands do cave suddenly, and without warning- The contractors should be made aware
of this potential hazard.
Water should not be allowed to flow uncontrolled over the top of any temporary
or permanent slope. All permanently exposed slopes should be seeded with an
appropriate species of vegetation to reduce erosion and improve stability of the surficial
layer of soil.
DRAINAGE CONSIDERA�TIONS:
Footing drains are recommended at the base of all footings and retaining walls.
These drains should be surrounded by at least six (6) inchpq of one-inch-minUs. washed
rock wrapped in non -woven geotextile filter fabric (Mirafi 140N, Supac 4NP, or similar
material). At the highest point, the perforated pipe invert should be at least as low as
the bottom of the footing and it should be sloped for drainage. All roof and surface
water drains must be kept separate from the foundation drain system.
No groundwater was observed in any of the 3 test holes during the fieldwork.
Seepage into the planned e)<oavation is possible, and likely if cxcavation occurs during
winter months, and if encountered should be drained away from the site by use of
drainage ditches, perforated pipe, French drains, or by pumping from sumPs
interconnected by shallow connector trenches at the bottom of I the excavation.
The excavation of the site should be graded so that surface water is directed off
the site and away from the tops of slopes. Water should not be allowed to stand in any
area where foundations, slabs, or pavements are to be constructed. Any exposed
slopes to be covered with plastic to minimize erosion. Final site grading in areas Iding,
adjaccnt to buildings should be olopod Ot least two (2) percent away from the bui
except where the area adjacent to the building is paved.
r_-r_m;=PjN1 FARTHWORK AND STRUCTURAL FILL:
The proposed building and pavement areas should be stripped and cleared of all
surface vegetation, all organic matterl'and other deleterious material. The stripped or
removed materials should not be mixed with any materials to be used as structural fill.
. 3tructural fill is defined as any fill placed under the building, behind permanent
retaining or foundation walls, or in other areas where the underlying soils needs to
nd nftpr px(,.;;vsfion
engineer should observA- site
SUpport loads. This . con(.iitions riiirino A
prior to placement of any structural fill.
!V4dZo:ZL 90/11/1 pi, AT a DO U
!JOUJOM Mon"D
City of Edmonds
c/o Aaron and Chloe Cerutti
April 14, 2004
Page 7
All structural fill should be placed in horizontal lifts with a moisture content at or
near the optimum moisture content. The optimum n-ioisLuie Uoritent is that moisture
content which results in the greatest compacted dry density. The moisture content of fill
soils is very important and mijst he closely controlled during the filling and compaction
prOcess.
The allowable thickness of the fill lift will depend on the m5terial type, compaction
equiprpent, and the number of passes made to compact the lift. In no case should the
lifts exceed twelve (12) inches in loose thickness. The following table presents
recommended relative compaction for structural fill:
Location of Fill Placement
Beneath footings, slabs or walkways
Behind retaining walls
Beneath pavements
Minimum Relative
Compaction
95%
90%
95% for upper 12 inches of
Sub -grade, 90% below that level
Where: Minimijm relative compaction is the ratio, expressed in percentagcs, of
the compacted dry density to the maximum dry density, as determined in
accordance with ASTM Test Designation D-1 557-78 (Modified Proctor).
Use of On -Site Soils
If -grading activities take place during wet weather, or when the sandy, on -site
soil3 are extremely wet, site preparabuij uusls may be higher because of delays due to
rains and the potential need to import granular fill. The on -site soils are generally sandy
and thus are not particularly MniRtUre sensitive. Grading operations will be difficult
when the moisture content of these soils greatly exceeds the optimum moisture content -
Moisture sensitive soils will also be susceptible to excessive softening and
"pumping" from construction equipment traffic when the moisture content.is greater than
the optimum moisture content.
Ideally, structural fill, which is to be placed in wet weather, should consist of a
granular soil having no more than five (5) percent silt or clay particles. The percentage
of particles passing the No. 200 sicvc c,�hould be measured from that portion of the soil
passing the three -quarter -inch sieve.
!jeujem monqo <- !1Nde0:ZL so/LLIL
City of Edmonds
c/o Aaron and Chloe Cerutti
April 14, 2004
Page 8
The use of "some" on -site soils for fill material may be acceptable if the upper
organic materials are. segregated and moisture QQntents arc monitored by engineering
inspection.
DRAINAGE CONTROLS:
No drainage problems were evident with the overall property at 202 7"' Ave.
Currently, it uppeais that any storm water runoff flows northerly then westerly into
the City of Edmonds storm system present in 7 1h Ave.
If desired, the sandy sub -grade soils will allow for on -site infiltration. Further
discussions with City of Edmonds to clarify drainage system.
CONCRETE:
All foundation'concrete (footings, stem walls, slabs, any retaining walls, etc.)
Shall tidwe a (11illirrium celflerlL (;Unterit uf 5-1/2 6acks per cubic yard of concrete rnix.
SLOPE SETBACKS / BUFFERS:
As previously stated. the proposed Cerutti residence is understood to be sited in
the central portion of the property.
This engineer recommends that no slope disturbance, cutting, or undermining
occur.
INSPECTIONS:
The recommendations of this report are only valid when key geotechnical
aspects are inspected by th*s enaffineer dUring construction:
Any soil cuts
Foundation sub -grade verification
Retaining wall, or rockery pJacement
Any fill placement
Subsurface drainage installation
SUMMARY:
The proposed Cerutti residence at 202 7t" Ave., Edmonds, Washington is
gootechnically viable when constructed in accordance with the recommendation-,
VMaeo :;3 1. go/ L t
city of Edmonds
(-,/o A2ron and Chloe Cerutti
April 14, 2004
Page 9
herein, compliance with City of Edmonds approved plans and requirements, and key
gpotechnical inspprtinnR during non.stri.iction.
GEOTECHNICAL REVIEW OF FINAL PLANS:
At the time of this investigation and report, final house plans were not available
for review.
'Ao 3tated in thi.s report, the Cerutti residence may bi-, located anywhert- on the
lot, subject to no soil cuts in the adjacent right-of-way slopes.
Prior to final permit issuance, this engineer should reviewthe final hou . se plans to
compliance with the recommendations of this report.
Upon satisfactory review, a "Statement Of Minimal Risk" will be issued.
CLOSURE:
The findings and recommendations of this report were prepared in accordance
with gpni-r;illy Anr.Ppteri prinfessinnal Pnoine.e.ring principles and prRntice. No other
warranty, either express or implied, is made. The conclusions are based on the results
of the field exploration and interpolation of subsurface conditions between explored
locations. If conditions are encountered during construction that appear to be different
than those described in this report, this engineer should be notified to observe the
situation and review and verify or modify the recommendations.
If there are any questions, do not hesitate to call.
DMB:abj
M.
G
NA
2) 0 L
004
L,-� /V
Dennis M. Bruce, P.E.
Geotechnical / Civil Engineer
OL 968d !jeujem monwo <- ! vydco: ?, t so/ L L /.L : pa/%T a oaH
Li
C13
171-11 #�
.IDDP
jai
.r
&J Sl Ri r
rr
=.PV
00 64mrs ;-00 Tvk ftol. tlpM
ED
r
�13 I "r' ";, E E T F I L E
ALL EX06990 SURFACES T-Q)
9E CWERM WITHIN 2 DAYS Z (c V,
p a-, 0 % 4,X(,LjA
0 UK ;'(0 4�� '3 FEB 0 00 2j05
x
ft-UPORARN'
4.
N.
Z
L
z
UJ
Q% (-'NA
v --.. —0 v
INSP CTIONS Agem
C41- 42'
P.DOU11011ED
pi 4".
0 0 L, lv-� 'btAIIJA6C
-rL) tJ. z -
�j sj t, r(? A r ,
. y () eLoo�,
P-.r- o' 0-
a. ul c�
uj QO le
0 = cm CD
co co:;E UM
0'1
Doj
ok,ro
6alcoo '�,�-00
�Je- aou(�- WP,,F,
104 &,0-07 a'
1*,0 \� WkLL
sz�l
FOOTING BRAINS NOT
TO BE TIED INTO
D - -ENTION' SYSTEM
Q,
61,
0INNER/C01N] �v' "' -fL)Vi IS RESPONSIBLE FOR
EROSION CONTROL AND DRAINAGE
STANDARD
OWNER:
A tjo 0 G a-A-S5
nETENTION SYSTEM WORKSHEET
001
(5000 SF OR LESoj
ADDRESS:
')-oo tY'Aal. /4-
CALC. BY: CL,of
PHONE: ()L-o 0 11;L - tt �Lq
DATE: vas;-10
IMPERVIOUS SUFACE AREA PIPE DIA. PIPE LENGTH - W, ORIFICE
FOOTING DRAINS SHALL NOT BE CONNECTED TO
OCKING LID (TYP-)
IM ELEV.
RIM ELEV.—� DETENTION PIPE LENGTH 6' Min. clearance
ED Measured from top of
-*E Conc. box or riser.
/F F
11MI
DETENTION SYSTEM
RIM ELEV.-
0.5% TO 1 .0% SLOPE H TO C17-Y CONVEYANCE
\--iNV INV. ELEV.
INV. ELEV. ELE'V.
"'—OUTLET
UPPER CATCH BASIN CONTROL
ROM CONTROL CB 9" 1 N.. RIFICE
2'X2'Xl 2' DEEP CONTROL CATCH BASIN
(4--6- QUARRY SPALLS OR EQUAL) IN. 6"COVER
FROM CONTROL C 13-
-f- C
NR ONTROL CB 9- JIN
OMC
2' 2' DEEP
(4 QUARRYSPALLS
SHA
TRENCH SHALL BE LINED
CONTROL CS
SHALL BE PERPENDICULAR 15
TO SPREADER TRENCH
WITH MIRAF1 & ON TOP
% PERF. PIPE SHALL BE
LEVEL & CAPPED AT ENDS
RIPRAP OUTLET 7/8"WASHED DRAIN ROCK
SPREADER TRENCH
NOTES R
1. CALL ENGINEERING DIVISION (771-0220 EXT. 1326) 24 HOURS IN ADVANCE FOR A TIGHTLINE AND DETENTION
.SYSTEM INSPECTION BEFORE BACKFILLING AND FOR FINAL INSPECTIONS.
2.. Responsibility for operation and maintenance of drainage systems on private property is the responsibility of the property
owner. Material accumulated in the storage pipe must be flushed out and removed from catch basins to allow proper operation. '3ZI
The outlet control orifice must be kept open at all times. r- .
CITY STORM
CONVEYANCE
SYSTEM
SPREADERTRENCH
SHALL BE AMIN,
OF 10'LONG AND
PERPENDICULAR
TO CONTROL CB.
DATE
I W_
N
Wk
.1 () F E.D,,.,,_
5' Deep
BELL ST
CITY . OF EDMONDS WATERLINE AS -BUILT
ADDRESS HOMEOWNER
ul 200 7TH AVE N I SNODGRASS
CONTRACTOR SCALE
CHUCK WARNER NTS
DATE DRAWN WATERLINE
7/13/05 By 1. ABILA NO- 2005-0250
A () f
---qqq ;A ___�
CITY OF EDMONDS WATERLINE AS -BUILT
ADDRESS HOMEOWNER
200 7TH AVE N SNODGRASS
CONTRACTOR ISCALE
NTS
DATE DRAWN
7Zl,3XO5 By 1. ABILA
WATERLINE
No- 2005-0250