Loading...
200 BEACH PL.PDFIIIIIIIIIIIIII 10217 200 BEACH PL *,RCE L i qg1 of 'rig' t -way inV nvon the Wes h a p terl 11 Y t No a in) Railroad 50 f Northj&y. from South, 1P line f sai merit Lot 2 d 6'v'e rn i1Pjection-,23j;­Townsh- Al y 2 7 North Range 3 East W.M. measured. along the Westerl e line,of said right of w�y.- thence North 490 West to th -meander line; thence,Worlth SX0241 East along said meander, h:-­"�+4, 17. f beginning; thence line 9.15 ft. to the t,,rue ppap o North 380371 West 276.68 ft.Jtot.the inner harbor line; inner -harbor line� thence North 44*3913011 Eas, ala�r, '-is�,"6.68 ft. to '100.12ift.; thence South 3803.1f,'I,, P'4.,,;,�;-.iimeander. line; thence 'South 5'10241- t along said meander, line to true point of beginning. *'.."44, w it) -PARCEL B —Commencing at a point on the West. line o Montana Railway right of way (now Great t ailway),� r-O ft. Northeasterly from the South line U E t Lot, 2, in Section'23, Township 27 North.- Ra thertrue'point of be8inning; thence continu 0 ea t :,along Westerly line of said Great Northern Rai qy r rly at right angle" 0, of way 100 ft.; thence Northweste 'Westerly line of said railway right of way to the Sound; Government meander line of the waters of Puget thence South 510231 West along said meander line to a point which is North 490 West from the true point of point of,:',',., beginning; thence South 490 Last to the true ' beg' TOGETHER WITH an easement for ingress and e'gress.' innings. 3 lying'Southerly over and across a strip of land 10 ft. wide right of e a. line parallel to the Northwesterly line of th es Real Estate Appraisals Commercial Industrial Form R Idential 12 5 4-1 n 10e f �j' 1 4' 0 A ADDRESS: TAX ACCOUNT/PARCEL NUMBERIN3-12-q`�O 0 1 Z-b ( 0 ()—W(3 , 0 b7 Zq5 Q 0 1 1 0 2- 41 fg)- q�jo a ' 06-72-456bIq0(o0-c+i)C) 1 0617-+500 ISO I rjo-"ri BUILDING PERMIT (NEW STRUCTURE): lat'll 0121111 / I W'7 -1/ C,1 -17 COVENANTS (RECORDED) FOR: CRITICAL AREAS: C)+--A-QC) - DETERMINATION: [:]Conditional Waiver XStudy Required Fj Waiver DISCRETIONARY PERMIT XS: A08 -'M'83(kA-A0deA) AbB DRAINAGE PLAN DATED: .':� I � PARKING AGREEMENTS DATED: EASEMENT(S) RECORDED PERMITS (OTHER): IBM., IM11,1111'Pi 1111111igl m5law llililli�IIIMVI "I. 611!�iiijj��, i"IC JIM— PLANNING DATA CHECKLIST DATED: SCALED PLOT PLAN DATED: JR 111,11n , 41,"flqy SEWER LID FEE $: LID #: SHORT PLAT FILE: LOT: BLOCK: SIDE SEWER AS BUILT DATED: SIDE SEWER PERMIT(S) #: G EOTECH REPORT DATED: Di STREET USE / ENCROACHMENT PERMIT #: FOR: WATER METER TAP CARD DATED: OTHER: LATEMP\DSrs\Fomis\Street File Checklist.doc (a. 0I 'J Z cc PLANNING DATA New Commercial Mulffami SITE ADDRESS: 2-00 ZONING: USE(S) PROPOSED: Ptg'/ (m,) LA=) - ALLOWED?: Yq - /- i 9-7z LEGAL NONCONFORMING LAND USE DETERMINATION ISSUED (Y/N) CUP File: To Allow What Uses?: ADB FILE #: ref al�) be(k) ZAA W-)-% -U-e1PAj- PARKING: .(v- 4+—,�G Use: No. Spaces Required: . X (floor area, # employees, etc.) = Use: No. Spaces Required: X (floor area, # employees, etc.) = Use: No. Spaces Required: X (floor area, # employees, etc.) = Use: No..Spaces Required: X (floor area, # employees, etc.) = Total Required: Actual Provided: SETBACKS: W- 0- be t�j Required+ Setbags- Front: Left Side:- Right Side: Rear: Actual Setbacks: Front: Left Side: —Right Side: 'Rear: Street map checked for additional setback required? (Yes/No) MAXIMUM FLOOR AREA: tv- &*,,� I . Maximum Allowed: Actual: BUILDING HEIGHT: �10 6111-� Maximum Allowed: Actual, Height: Modulation Allowed?: Modulation Height: Datum Point: Datum Elevation: Elevator Penthouse > 3 feet over height limit? If so,VAR# LANDSCAPING: N. Matches ADB approved - Bid Provided? Bond Amount (100% bid): CRITICAL AREAS #: Zm4 - 6o �eL2:!�j) -,s Iiia V SEPA DETERMINATION: a-4v--wA S�w�- SHORELINE REQUIRED?: YeA - i5x22i,, Continued ... 1Ahbrary\^P1andatNewComm.doc 0 DATE: 5-12-4 /c, 4 PLANCHK#: `�74,-IS7— NAME OF BUILDING PERMIT APPLICANT: f-66 Tike /* / 0/) PROJECT DESCRIPTION: P/z,!,D3 Sorm x7 gL".4 4rztc r4- 4, ADB FILE#: E2zu- ORDATEWAIVED: PLANS MATCH APPROVED PLAN: SUBDIVISION: P-til, Ta, 4,.w- LOT AGGREGATION REQUIRED?: IyA REDUCED SITE PLAN (8.5X11) PROVIDED FOR STREET FILE? A)A OTHER: Plan Review By: 1Afibrary\^P1andatNewComm.doc PLANNING DATA STREETF=ILE Name: F- OL V-1 01 ij M C, 1) 0 L,4 9 a I I Date: 0'4 .1-4 - 2,,OC) & SiteAddress: 2,C)o Beacin PlaCa :W- 107- Plan Check #: BLD-2006- () (0 9 Project Description: CLA tty ot-ti oyl ( 19 V M F D LA.+ W(VI d..OLAX W a I I Reduced Site Plan Provided: �E'DSNO) I Zoning: C,\&l Map Page: 1, 0 1 1 Corner Lot: (YES / no Flag Lot: (YES Critical Areas Determination #: OM Study Required '*� 100 +. oocp 0 El waiver W 2- 0 Of Of 5, K,0 If tUrue-., SEPA Determination: "f4nftQt Exempt Needed (for sites with 500 cubic yards of grading or within 200 feet of Puget Sound or Lake Ballinger. Requires: (1) Fee, (2) Environmental Checklist, and (3) APO List with notarized form). Re dSetbacks Street: Side: Side: 0 ear: N ActualSetbacks Street: Side: Side: ear: El Detached Structures: 11 Rockeries: N 0 V, El Fences/Trellises: El Bay Windows/Projecting Modulation: E] Stairs/Deck: Parking Required: Parking Provided: Lot Area: Lot Coverage: N Lot Coverage Calculations: Building He�t Datum Point: Datum Elevation: Maximum Height: Actual Height: N ADU Created: (YES Subdivision: A r-:* ';,7 10 W 9-D 0 Legal Nonconforming Land Use Determination Issued: (YES / NO) Other Plan Review By: g,,t;w &,� C�� #P20 CA File No: NA Critical Areas Checklist Site Information (soils/ topography/ hydrology/ vegetation) L. Site Address/ Location: 1p�e e #- /�p ( 2. Property Tax Account Number: 0-7 --Lct 17-�00 f ( kop(n 3. Approximate Site Size (acres or square feet): I!Er2 soock V 4. - Is this site currently developed? 4 yes; — no. If yes; how is site developed?.,. 5. Describe the general site topography. Check an that apply. Flat. less than 5-feet elevation change over entire site. 6. 7. F-11 Rolling: slopes on site generally less than 15% (a vertical rise of 10-feet over a horizontal distance of 66-feet). Hilly: slopes present on site of more than 15% andl4ess than 30% (a vertical rise of 10-feet over. a horizontal distance of 33 to 66-fee Steep: grades of greater than 30% present on site (a vertical rise of 10-feet over a horizontal distance of less than 33-feet). Other (please describe): Site contains areas of year-round standing water: Site contains areas of seasonal standing water: - What season(s) of the year? ; Approx. Depth: ; Approx. Depth: Site is in the floodway — floodplain of a water course. 9. Site contains a creek or an area where water flows across the grounds surface? Flows are year-round? Flows are seasonal? (What time of year? 10. Site is primarily: forested — ; meadow shrubs n-dxed urban landscaped (lawn, shrubs etc) 11. Obvious wetland is present on site: 1. Plan Check Number, if applicable? 2. Site is Zoned? 3. 4. 5. For City Staff Use Only SCS mapped soil type(s)? WAZ-;o LM 0 Critical Areas inventory or C.A. map indicates Critical Area on site? 46flguo Site within designated earth subsidence landslide hazard area? t� 10 DETERMINATION 'PI-1 STUDY REQUIRED WAIVER Reviewed by: Date: 6114 F)-�- 'ec. 1%19' #F20 City oJOVEditonds Development Services Department Planning Division Phone: 425.771.0220 Fax: 425.771.0221 The Critical Areas Checklist contained on this form is to be filled out by any person. preparing a­lkvelopment Permit Appli cation.for the. City of Edmonds prior to his/her submittal of the application to the City. The purpose of the Checklist is to enable City staff to determine whether any potential Critical Areas are, or may be, present on the subject property. The information needed to complete the Checklist should be easily i from -as te 'a",6&ile �at. PON nSel2 0 7 4 V WMMMWJ PPUCATION P1 D DEDkirr f%ni Mrrrn Date Recd"..%Id: City Receipt#: Critical Areas File #: Critical Areas Checklist Fee: $135.00 Date Mailed to Applicant A property owner, or his/her authorized representative, must fill out the checklist. sign and date it, and submit it to the City. The City will review the checklist, make a precursory site visit, and make a determination of the subsequent steps necessary to complete a development permit application. P lease submit a vicinity map, along with the signed copy of this form to assist City staff in finding and locating the specific piece of property described on this form. In addition, the applicant shall include other pert . inerit informationJe.g. site plan, topography map, etc.) Of studies in conjunction with this Checklist to assistant staff in completing their preliminary assessment of the site. 1he undersigned applicant and his/her/its heirs, and assigns, in consideration on the processing of the application agrees to release, indemnify, defend and hold the City.of Edmonds harmless from any and all damages, including reasonable attorney's fees, arising from any action or in&action based in whole or part upon false, misleading, inaccurate or incomplete information fumished by the applicant, his/her/its agents or employees. By my signature, I cer* that the information and exhibits her ith sj�bmitted are true and correct to the best of my ewl knowledge and that I am authorized to file this application on tLe ��he owner as listed below. SIGNATURE OF APPLicANi��_ DATE 7 -7 - Oc-( Property Owner's Authorization By my signature, I certify that I have authorized the above A�icant/Agent to apply for the subject land use application, and grant my permission for the public officials and the staff of the City of Edmonds to enter the subject property for the purposes of inspection and posting attendant to this application. SIGNATUM Of OWNER - I PLEASE PRINT CLEARLY Owner/Applicant: Name Street Address city State zip Telephone: Email address (optional): DATE Applicant Representative: Name -7 1(< Street Address )UCL4L WA-_ city State zip Telephone:- �1?_ 5-1 oz- Email Address (optional): 0 a 2 KZ i EBE3 T10F= A CONOOMINIL-l'.1 SECTION 23,TVVP.27N1-,P-3E-,VV-M- CITY OP ErDN'10rJOS Sr,jCT-EOrAISH COUNTY. v,/ASHINGTON LEG�L DESCMIPTION ...... L', C, .".1 or Or ulL:-GION1 ;,� L , I . I I. 111111:01111. , I'- 'OV LIN 0 SAID V IT THE , �. LOT I SECTIC-1021. 77 11011. 3 1 IT w 'r tol.ill AID", -1[1�l iAl D (It THE u"'s"t" k 3 -("CEO-011- 51-;4' EAST AIOtJG ul�"(,;i- or a(rroillln; IMPAct .011H C,;" -CC O'IM "I", I'i CCITT" of 11,11; I--E-Kt WJRIN(' - I'll it: 0 1 (.IT 'LL,,r SAID I'llifill 14AP 0 D. LI-L ICO.12 ;ItI; :Ht-CC 501-IN 311l 10 1 1.111t; I.I.CE SOUTH 31-14' TETI AILO�C SAID WANDER LI-t 10 THE TIU[ PCITT Of IIECI-11-G, ripcft I (C—I1<11�AAt5A Do T.t I;. I A I I'll 1011.1.0-11 Kli "Itli ;O(INI V1 Pic , 1 0 1 1 a r I K. ].(A It , , , 0 . I C of I CI I W SEC11011 1), 10:11S.11, 2; 1101111. 111K[ I A%;. . W, SAON-11`4 c ", �, "'p ........ C; lol.,(f co"Illivil-c OW)Vlw- I,. 1AIL Pull 1-1101, it, I, 01 -.1 ItIS ill THE.([ At i11:;L111.LIC1.`lr *or I'll IIILIOAD PICINI or 'AT 10 cl�ltlillllrlll I -All-S �Df 'L"I 'N'AC, SOL'. I.". IT I W( 10 A , , I 'Gill -.1c. Is 110,14 It- �l f-11 1 0 a PINING; THENCE Sol%. — (ITT To 1-1 I'VE 1GI..I 'If PL11;.-",,,O Sll�'!E [Is lot COUIIT OF ',!Alf Cr s CC, 10 (.5E.C.'s AND Ls—rl�s - "IC-0 L01ILL-1--l"ICT 1 .11— . — 6 U. A A- I �'e 4A 1p, :110 ilt-',i M-nl< �':GEND 101 til I P ("'IlEt 01 LIGHT 1-11 11 DA110. .19) --r1; ILAI-t-l- CAI l- 0 1— LIAO 11-Irl 1 0 LL tu 0 0 Er 0 /, I -q 2 1 IJ v 6 0 0.). n-Cr. I I C. 7 r-1 I I I N r\ 0 C:14� i fn ,!ra I I W, JI, Nj 0 Ent ............. Ma�1,19 04 07:45p NW Teamworks Cargobat 425-893-9371 Oeamw6rks Ca,rCabat 425*-9371 p.2 11 04 02:37p reAY-07-2004 11- 26 P. 02/04 CITY OF JWMONDS SIPECLAL INSPEMON AND TESTING AGREEMENT The RMect at -43--isnued =dcr buiWin permfinumber SPWW =,P=tm andfor tesa' UBC Chapter 15 ,,A n per and WAC Am =U 17M Tbe comy ofspecial inqx=tions is anwJfcd to tbis docunient- BEFORE A PERhM CAN 819 MURD: The owner and contisaw and ,n;haU cmupleft this agrccrocut and the attached mwumal tesqs) and mpections =11A �Iud the required arlm-wledgments- APPROVAL OF SPECIAL INSPECTORS: Each special ins poctor shall be approved by the Budding Official prior to perforrahim any dud In tion!L Ewb opmal inspector ow Submit I S(atepect. of ou2iliscationg. to the cial r rMew. special Wsp=tm shall displa:y identification when a fim a special iz�� an Wft. 4mial inspection and testing shall meet the nummum ents ; WC Chaptei 17 and the followi* A- D UsUad Ressomm 1. Observe Work I 71te special hNipector d" Observe ft site work for conforntswe with the ved "kt=tV phm..=d opcofications and applicable wodanancWp, providons of die UBC S or Enginew rmewed sbop dmwings may be used a* as an aid to hapection. . pecial inspections am to be perta; cd on a cmthmotw bWa-meanin do thc special bispectur is on site at all twos observing the wor mq'r=& special imimeti a. Periodic ins0ections. if Inn must haw r6yal by The City.bued an a separate written plan I PrWr 2%Cial =6 11W eUSMOr Or architect Of LeCD2 reviewed and approved by the B�� 2. Report Non-confh!ralt� MW SPCC321 inspector bring itewis to the bnmed ate atteation of the contreelor and soft all such item to die daily fleg repuz . Any ft= not resolved in a. timely manner shall be immediate cmw of ft specW inspww to noff the Building Official of the y plan devixftoz� ca r, change or otWaxion- , It sbW sho, be the duty of the spcegal hapector to promptly noffy &e mgm Of architect- 3. C=.Da'dyPR Is sh shag complete and sigm both the specu'd inspeW n P c a and the Wy -epos fiwm for each day's inspection. The= records kho remiain at ft jobsite with tWe contractor for review by the City BWding Inipicctor. 4. Forulab WvcW Repwft 71W R.Mcialjn�- or U*% .ipection agency dud] fmmish the City with weemy reports of tests mid inspecdom ect engmecir or archaeck mnd odwra as denguated oban also be "Wied on epcn - W reporft - imIude fte UhnnnV Desarkdon of duil Y and tests made with applicable locabous Ust Of aan , ng item R an sbfts 0� -- "W" _ _ a, items (resolved or unmolved) iteatized cWages stAborized by the Architect PA&w and City if not incht" in nonconforname item FurniabFinalComr1ruclin Repeft, The stecial bispector or nupecuou agency shall submk a Emal difined.cpar to the City statin that a g item T0q, is] inspe�tion and lestim were fillfilTed and reported. M4 to the best of his/h maw = dw Pcoject is in confounauce with ft appruivad plans aW Mcifications. approved change omen and the applicable workmunzsbi� provisions of the C. Items not in cmfum*ce or varcsolved item or any ftcrepand-es in uLipection coverage, (i.c.. missed inspections, peno&c mopection when c&abmww wzpccbons were reqvdmd, e1c.) sball be speoffically itemizodm thismpow p. 2 Matj 19 04 07:45p NW Teamworks Ca, rrobat 425-893-9371 p.3 NIT 425-03-93*71 p.2 Ma!d 11 04 04:17p eamworks./ Ca I igabai MAY-e7-2004 11'27 P. 03,104 B. I. Nodgy UK Special 10"Icew It is the duty of dw n naback, to notify &e special inspector vAw vmrk is ready for special inspectim Note, the il=$ hftd on the arbelmd wbxbde nd as oned an the VMoved plans and specifications: am mquirW to have: special inspeatimts. Adequas notice sW be provided by the contiactat so thst the MMicid inslwctor has tim to becom familiar vvi* the prGjCC1- 2. Provide Accew to Approved Plan3 Tbc cantr=1or is responsffile for providing ft special inspecIor accesa to approvcd pL-M as thejobsift 3. Retain Special lmqwcd= Rftords The emwactor is rmponsible to Ictam' at the , tisitc a a wspemion ramds submitted by &e special inspecior. Then teewtio, am toC pw�Uff=o the CiRy building inspector upon C. Cb of U-1=21hilifiem I . A&prove spedW im2pechn or fuspectk= agasicin baikfing dqPrUDCM 611811 8016ye all VeCial insPaCtors and qx:ciW inspection 2. Moutdor specId Imspection and a#pruve weekly reporb Wolk WeMial am and Ow Of special impecifts WW be MOU "Pwval be obtained prior to VWnL=b i I y City B OWMapp :&:,g bspector. placcuamt of concrLpte or odKr similar iativities in afttioii to do of am specW inspeant. 3. lame CeMficate of Oempancy ne Buming offikeial ma . Y Issue & Cwfificstc Of OwuPzmT afIft all weeldy special inspection icpw mcluifing the finaf report have be= sul;mitted =2d. acceptexL D- Owner Ile pro'cet'awner or the enginew or ambited of cc= aaft as the awnarls, agent dallfiand j spemw finvaction senice& F- Enelater or Archited of RMEd )MUggEWhilifia The engincscr or architm of I Islan inel WCcW inVoction requkements an ft plens and ACKMWLIEDGEMEM- I how remdand a&** to cwvep,�, %wh the nww wd cmdulow afthiv qXrftment. Owner i &a-- - Special Inspector G=wW FNArA= Ma!d 19 04 07:46p NW Teamworks / Cargobat 425-893-9371 p..4 0.5,/12,'2004 AVED J.2:1.4 FAX 72 050(� I-N-Tinwbcd 41orfda Adamn. Q002/003 C M' a Y., i 12 ( 0 It 7 13 A. 'm Orke Amento I t 0 No-4981 P. ma N- ks./ Car P.2 MnY-07-2004 11:-3-7 P. M104 tustor IR MCA - OWQU&Hiw Notify the Special Inspector It is the duty of the contragwr to not* the SP=i4l inspector when, V'ork is mady for Sy'ecial 'mf't'am Notr� the items Umd On the attadted whedule ad as now on the appmed plans mud Specifications am rvqubed to haw special iuSpectiom Adequate zkotim zW be pievided by the camactor go that the sPecial kwPeeftr b45 time 10 beOOMG fimmillar with thc plic4ed. 7. Provide Acme to Approved Pima The Contractor is rcsporimble for providigg ft spedal thajobsite. iBR=tO]r MOM to approved plans at 3. Reftla Special lumpecdon RecordB 'am conttactor is Omponsible to Main at the jobsite aH special JoWcation secords mbmined by the special juspwor. Then records are to be Provi&xf to am CitY buiMing inspecWr upon MqUCSL CJ* of Edmads Ruildfim- I. Approve speew Inspectors or laspection egentift The buiLding dcPwMeUt ShRU a0mve all special in6pectom and Special ijrWmtion 2- MODROr sPe.ch.1 10qx4ft' 2 And SOProve weddly reports Work ial rtbanance of P%Munmg gperl aztgal m1homw 'be mom by the City PMW. = approval %:I bcm=!"aS &h2U bo Pla - entolcomcfet orothrTstfrdhiracmdvities inamitiouto dug oftbespccial * prior to inspector. 3. Ism Certlacate of Oemp"ey The Mding 409ficia Lwmy imle a Certificate of Ocm . -wancy after an weemy spccw inspection reports inclawing the nm report have been admiacd and acceptcdL n- Tke pro, or the eaginm or am%ifta of. cc%n amiag . jwt owner as tbc ownWs agent'dan.fid spmal ii�on services. E. EnplagerorArrhilmaDlIg Reammbilifia no engineer or wcMtmt of rocord shma inchide qmml bwPftticm r0quimments; an the Plans and Specificadons. I haw ACKNOWLEJDGEMENTS. . . road and 4grm w comply wah be ftrw MW comdWom Orthip qg7vem,,N. V-T-C,iF PP95-'TDf- ff C— I 'C"- - QV%0.4.2 - General cc IF m YZA W, 0: il T, - rd rA N MA ffE Matj 19 04 07 :46p NW.Teamworks Cargobat 425-893-9371 Toamdorks C�urgobat Maj I I — 04 02:37p 425*3-9371 p.3 MAY-O?-2004 11:27 P.04/04 77; je &,A� XEV4MCZD CI)NCMLTJE, GUPWM GROM AND MORTAR: STRUCTURALSIL MJWELDMG- Sv-W bqmfim umna und Pfthftb-Y A-*— T-M (Mmmy . U&W. W@4 plij, I- -SwInw—Te-lif. GMAL Raw W&A fti�) pt—buiomimsfunin —swv*md7mmw I 'R,mmbmbdo.) — Sbw I - - , , wColiscotwe —TAW"IM-- OZhW OFiseld Ubm-k LEPRIllm Oshop OREM n4bd� Bokbe Im"Insim D3ftp cIrww 0^30 DAM ON ox OF Re6&ocimp Sad Mk-td Smd WAaftS &rApwjim ommft lawn Wa6m ftw"m FUtEPAWFVYQ- ?WE== lmpwtico 13CMN), Tim —TWk&mmTew —hapmamclurs WSULATMG CONCREM sft*t ad Tim vikis Wzjswz .FU-LMATEJIUAL: Aompm=Tcsb pbftweu kIpwim FkM Dousky SrKtx,7uRAL Wow: Slow W&UNdIft No"im AVIDMONAL IMMUC77ONS On O=ER TEm smqk Md TM cw"� A KD IMPECTIONS- p L&5 - Tdk Dow TOTAL P.04 of EDA CITY OF EDMONDS. 121 5TH AVENUE NORTH, EDMONDS, WA 98020 (425) 771-0220 RCW 197-11-970 Determination of Nonsignificance (DNS) . DETERMINATION OF NONSIGNIFICANCE Description of proposal: Repair displaced living room concrete floor slab and adjacent patio slab with pin pile and a e earnfigundation(damaged in October 2003 storm) and repair west living room exterior wall N Uq. L0: L-0-4 -511.5 2)) Proponent: Northwest Teamworks Construction for Ebb Tide Condominiums Location of proposal, including street address if any: 200 Beach Place, Suite 101 Lead agency: CITY OF EDMONDS The lead agency has determined that the requirements for environmental analysis, protection, and mitigation measures have been adequately addressed in the development regulations and comprehensive plan adopted under chapter 36.70A RCW, and in other applicable local, state, or federal laws or rules, as provided by RCW 43.21d.240 and WAC 197-11-158. An environmental impact statement is not required under RCW 43.21.030(2)(c). This decision was made after review of a completed environmental checklist and other information on file with the lead agency. This information is available to the public on request. XX There is no comment period for this DNS. This DNS is issued under 197-11-340(2); the lead agency will not act on this proposal for 14 days from the date below. Comments must be submitted by Responsible Official: Meg Gruwell Position/Title: Senior Planner - Planning Division. Phone: 425-771-0220 Address: City of Edmonds, 121 5th Avenue North, Edmonds, WA .98020 Date: I Signature: XX- You may appeal this determination to Robert Chave, Planning Manager, at 121 5th Avenue North, Edmonds, WA 98020, by filing a written appeal citing the specific reasons for the appeal with the required appeal fee, adjacent property owners list and notarized affidavit form no later than I- L,� 7- 5 .2004. You should be prepared to make specific factual objections. Contact Rob Chave to read or ask about the procedures for SEPA appeals. XX Posted on 2004; at the Edmonds Public Library, Edmonds Community Services Building, and the Edmonds Post Office.' xx� Distribute to "Checked" Agencies on the reverse side of this form, along with a. copy of the Checklist. Page I of 2 PC-04-152D.DOC 6/11/04.SEPA Mailed to the Owing along the Environmenta� with I Check# XX Environmental Review Section XX National Marine Fisheries Service Department of Ecology Northwest Regional Office 7600 Sand Point Way NE P.O. Box 47703 Olympia, WA 98504-7703 Seattle, WA 98115-:0070 XX Department of Fish & Wildlife i 16018 Mill Creek Boulevard XX Applicant: Northwest Teamworks Constructiop Inc. (Josh Krause) Mill Creek, WA 98012 7818 — 130' Ave. NE Kirkland, WA 98033 XX Puget Sound Water Quality Authority P.O. Box 40900 XX Owner: Corey Heins Olympia, WA 98504-0900 200 Beach Place, #101 Edmonds, WA 98020 Attachments pc: File No. PC-04-152 SEPA Notebook Page 2 of 2 PC-04-152D.DOC 6(11/04.SEPA 0�: EDA, CITY OF EDMONDS 250 5TH AVENUE NORTH, EDMONDS, WA 98020 (206) 771-0220 RCW 197-11-970 Determination of Nonsignificance (DNS) DETERMINATION OF NONSIGNIFICANCE Description of proposal:: Addition of living space to an existing condominium unit. The addition of living space will be comprised of the enclosure of an existing patio. The proposal is within the shoreline area, but the proposed alteration is valued at less than $2,500.00 Proponent: Harry and Rita Speiser, 2231 95' Avenue NE, Clyde Hill, WA 991014 Location of proposal, including street address if any: 200 Beach Place, unit 104 Lead agency: CITY OF EDMONDS The lead agency for this proposal has determined that it does not have a probable significant adverse impact on the environment. An environmental impact statement is not required under RCW 43.21.030(2)(c). This decision was made after review of a completed environmental checklist and other information on file with the lead agency. This information is available to the public on request. XX There is no comment period for this DNS. This DNS is issued under 197-11-340(2); the lead agency will not act on this proposal for 15 days from the date below. Comments must be submitted by Responsible Official: Jeffrey S. Wilso— Position/Title: Current Planning Supervisor, Department of Community Services - Planning Division Phone: 771-0220 Address: City of Edmonds, 121 5th Avenue North, Edmonds, WA 98020 Date: Signature- XX You may appeal this determination to Robert Chave, Planning Manager, at 250 5th Avenue North, Edmonds, WA 98020, no later than 1998, by filing a written appeal citing the reasons. You should be prepared to make specific factual objections. Contact Jeffrey S. Wilso to read or ask about the procedures for SEPA appeals. XX Posted on 4 1 b 1998, at the Edmonds Public Library, Edmonds Community Services Building, and the tdmonds Post Office. XX Distribute to "Checked" Agencies on the reverse side of this form, along with a copy of the Checklist. Page I of 2 98166A.DOC 6/22/98.SEPA Mailed to the following along with the Environmental Checklist: XX Environmental Review Section XX Department of Ecology P.O. Box 47703 Olympia, WA 98504-7703 XX Harry & Rita Speiser 223195' Ave NE Clyde Hill, WA 98004 Attachments pc: File No. Building Permit Application Plan Check # 98-166A SEPA Notebook David Seely The Driftmier Architects 720 V2 Market St. Kirkland, WA 98033 Page 2 of 2 99166A.DOC 6/22/98,SEPA 0 E D 0 7. MEMORANDUM Date: June 22, 1998 To: File No. Building Permit Application Plan Check # 98-166A From: John Bissell, Senior Planner Via: Jeffrey S. Wilson, Responsible Official Subject: ENVIRONMENTAL DETERMINATION FOR THE ADDITION OF LIVING SPACE TO AN EXISTING CONDOMINIUM UNIT. THE ADDITION OF LIVING SPACE WILL BE COMPRISED OF THE ENCLOSURE OF AN EXIS11NU PATIO. THE PROPOSAL IS WITHIN THE SHORELINE AREA, BUT THE PROPOSED ALTERATION IS VALUED AT LESS THAN $2,500.00; FILE NO. Building Permit Application Plan Check # 98-166A I have had the opportunity to visit the site, review the environmental checklist and the building plans, which have been prepared for the project a copy of which are filed in the official file for this permit. I - Based on my review of all available information and adopted policies of the City, I / recommend that an environmental determination of nonsignificance be issued for the project. Review by Responsible Official I concur: I do not concur: Comments: Je frevy S. Wilson Date I Attachments pc: FileNo. City of Edmonds cQ Planning Division 98166A2.DOC 0612V98. 1 8 q 0 - 1 99 - CITY OF. EDMONDS LAURA M. HALL MAYOR 250 - 5TH AVE. N. - EDMONDS, WA 98020 - (206) 771-0220 FAX (206) 771-0221 COMMUNITY SERVICES DEPARTMENT Public Works *-Planning e Parks and Recreation Engineering. January 6, 1995 Attn:.Jim Douglas Ebb Tide Homeowners' Association 200 Beach Place Edmonds, WA 98020 Dear Mr. Douglas I have reviewed your account and will allow a credit to your account for October and November 1994 in accordance with our City policy. The policy states that the customer will be billed at the retail rate based upon the average water consumption for the same period during the previous year. In addition, the. excess water lost from the leak will be billed to customer at the City's wholesale rate with a 156/o surcharge added for administrative cost. Only one leak credit will be 'granted in any three year period. Should you have any additional questi ' Ons after you receive your new billing, please contact Ilene Larson, Utility Billing Clerk. , Sincerely, ';RLon�#RaSnd Water/Sewer Supervisor RH/lk cc: Ilene Larson Utility Billing Clerk wordata\water\#600275 e Incorporated August 11, 1.800 0 Sister Cities International — Hekinan, Japan 0 0 0, 0 Mr. Ron Holland Water/Sewer Supervisor Public Works Division 200 Dayton Street Edmonds, Wa. 98020 Dear Mr. Holland: Dec. 26, 1994 RECEIVED JAN V i PUBLIC W08yS DEp7 Our Ebb Tide Homeowners President, Jim Douglas, conferred with you recently about an elusive water leak in the buil- ing. The leak was finally discovered and repaired, but not before there was significant water loss resulting in hor- rendous water bills in October and November, 1944. You indicated to Jim that there would be an adjustment in billing. We will appreciate your attention to this matter. Please find copies the the paid bills for Oct., Nov.and Dec., and the bill from Day & Nite Plumbing - also paid, herewith enclosed. t T4ank you in ly, Wy1ma Nelson, Treas. Ebb Tide Homeowners Association I CONNACT @ 8 Z 4, 9 Q�iy &',Nite Plumbing, Inc. ja -jq qq e'JOB LOCATION dba: D.qy & Nite Rooter S eNAME y I %^-A 7,75-6_464 353-6464 0 ehb4,,,& Ab" owmevs 36,4-0959 653-6500 L ADDRESS (PLUMBINGN'), D 11 ��Ince 1954 ZiD6 eea-eL T CITY STATE ZIP 0 P.O. Box'1021 - 18800 HWY.'99.' \Mter PHONE LYI�"OOD, WA 98046. k- Qujar PHONE WK DAYNIPI 077 CD �7 MSER DIAGNC;SIS'/ RECOMMENDATIONS DESCRIPTION OF WORK OTY. DESCRIPTION AM06—NT % . 1i -jpjakor se yic-r- 3/-111 Ao p I% um=A�2 o 6A V) ty IA 6 4. J SOURCE DIVIS . QN: /LIVC /0 /?—t2/qtf WATER PRESSURE PSI SUBCONTRACTORS MATERIAL WARRANTY • PLUAJING: All workiinanibij) and m—aTerials are warrantod for one" (4) year E%J1PME&.,.e_ A.S AA LABOR 00 PAID BY: CHNICIAN TIME RATE AMOUNT SERVICE CALL Zj unless otherwise specified or as stated on of this form, 0 None (Reason) • DRAIIACLEANING: Warranted for thig(30) days for lalJor only unless OCK# Ap it F LAT RATE otherwige specifid'd or a . s stated on lack of this form, 0 None (Reason) c3 cc 0 CASW) r-, —6,5 Af,;gl, 1-5' '! 6 W- - 4 W<- wo --,� do (Warranty work performed during reguh-tr bxIness houre) 0CLIEli?l ro Lf WORK AUTHORIZATION: 1, the undersigned, am owner/autgorized reprosentativeAe'naniof the above mentioned KOTHEO A,� 7&)c promises do hereby authorize the a6ove described work j�d agree to the terms, :f-1 00,) condition*and have read the 110 information, a* s stated on both sides of this form. te I , ULTime a" Material 0 Flat Rate'of $ 0WAWLY aj LABOR TOT* ORDE PLETE , JD0E /0,0 0.0�qc [701, 1 , 0 pj 0 T IN ou SIGNATURWU fi�i% adqawledge the oftfactory cornplobn of tM Above descrbed ITLEASE PAY F'11'OM THIS INVOICE M�A ll�z 8 90 - C)9 CITY OF EDMONDS 250 - 5TH AVE. N. - EDMONDS, WA 98020 - (206) 771-0220 - FAX (206) 771-0221 COMMUNITY SERVICES DEPARTMENT Public Works * Planning e Parks and Recreation * Engineering October 7, 1993 Ebbtide Homeowners #204200 200 Beach PL Edmonds, WA 98020 LAURA M. HALL MAYOR The City of Edmonds does not have any records showing the sanitary sewer line located on Dayton Street and Admiral Way serving your property, nor do we have any contracts stating the City will maintain this line past the City right-of-way. I have checked all easements and found no contracts that grant the City access to put such a utility in this area which is considered private property. If you have anything that states otherwise, please send us a copy and we will make corrections to our files. Until we hear from you, we will assume this line is a private structure and maintenance on this line is the responsibility of the association using such a structure. Sincerely, JUL(' -"I I.A,/ Ron Holland Water/Sewer Supervisor RH/l k cc: Noel Miller Superintendent of Public Works Attachment MATUSKA/TXTSEWER 9 Incorporated August 11, 1890 0 Sister Cities International — Hekinan, Japan 0 0 0 4� 11 1 f . 11 qlc I 'w . I I CENTER ISO '10 DAYTON -ST* -bAYTON-- ST.. WK MY lqc) OF 3 PLANT ISO, ?A lieiwr- vi A it 00 SQ ALOV 110 L tj A j? MM RIN L:v-4- A�Ao 14,1 .IT 40 z mom 4c -i �.ALDAA '61 sumsrr 32 CITY of ED B 'Adh=SS LICENSE APPLIC N t Mo*dsa,, hi Civic Center - Edmon s, s Ing on 98 0 City Clerk Phone 775-2525 D*— LICENSE NO. ANNUAL FEES PENALTY A HOME OCCUPATION CL.AS VA� LIC. EFFEC. DATE JREASG. LIC. NO.JSPEC. $1-0-0 (A) 7 1 1 Ii I I I , I I I INSTRUCTIONS: 2 LL )Q--- All items must be completed 0 SMA BUSMESS—, nr n Iinnfinn will not ho -qe-- RECEIPT NO. DATE PAID AL- $15.00 -.--0 PRINT X cepted. IN R SPEC. E BOX FO ISSU OF Sign and return application fEE PAID PENALTY PAID CORRECTED LICENSE WITH with fee. Renewals received 1 2 'LC' ACTION. after February 15 must pay penalty in addition to fee. NEW BUSINESSES AFTER JULY 31, 1/2 FEE. (PLEASE MAKE ANY NECESSARY CHANG A -Tg,R FEB. 1 L $5.00 0 ITIONAL $7.50 0 Business,With 10 or mq,re-6nployees ADDITIONAL $50.OQ , (C) ,6 NEW APPLICATION (LA) 0 RENEWAL (LB) Q CHANGE (LC) ::S) 0 DELETE ILD) OF EMT (3 (3 -F1 0 t�� -7 7 F - C/'o 2- -7 7 JUL NAM&02F FIRM BUSINESS PHONE MAILING ADDRESS V NATURE OF BUSINE$S 74�1� 2 -o eenet+ P4 0 C� -7 , , 'n D r. Of Public Works I— Y,-, 6 S, &M BUSINESS ADDRESS - INDIVIDUAL (S) PARTNERSHIP (P) CORPORATION (C) OWNERS NAME �bod 6- HOME ADDRKSS Do 0 e Al alS HOME PHONE I DATE OF'BIRTH PIACE OF BIRTH &X &ILY, M-1,4110 SOCIAL SECURITY NUMBER I :S�1�1-o/ '-EMERGE (PLEASE OTIFICATION: (1) NAME & TELEPHONE. LIST TWO) .(2) NAME & TELEPHONE 164-1 /,ya /s,1 WASHINGTON STATE TAX NO. V APPLICANT'S SIGNATUPI������� DO NOT WRITE BELOW THIS LINE STAFF REVIEW: FILL IN LAND USE CODE, UFIR NUMBERS, ZONING, ETC. CHECK APPROVAL OR DISAPPROVAL, DATE, AND SIGN. IF DISAPPROVAL, PLEASE COMPLETE "COMMENT" SECTION. ROUTE TO NEXT DEPARTMENT ON LIST. . PLANNING DEPARTMENT APPROVE 0 DISAPPROVE DATE LAND USE CODE ZONING CODE SIGNATURE CONDITIONAL USE PERMIT COMMENTS E= BUILDING DEPARTMENT DATE Building 94APPROVE E3 DISAPPROVE SIGNATURE 0 Permit 0 Hotel/Motel (L) Apt. Bldg. (A) COMMENTS: CAPACITY: (NO. UNITS, APTS., OFFICES, SEATS, BEDS, STUDENTS) FIRE DEPARTMENT - DATE ;< APPROVE E) DISAPPROVE SIGNATURE COMMENTS: POL E DEPARTMENT DATE SIGNATURE 11 �APPROVE- El DISAPPROVE F7 I I I 1 0 Office Bldg. (0) Occupancy El Restaurant (R) Group 0 Hosp/Nurs Home (H) 0 School (S) COMMENTS: 6 wl� now a I ILmLM PUBLIC WORKS DEPARTMENT 0 APPROVE 0 DISAPPROVE DATE SIGNATURE COMMENTS: PLEASE RETURN TO CITY CLFRK 04— 10-81 CITY OF EDMONDS ?00 DAYTON EDMONDS WA 98020 PAGE I NORTHWEST KIDNEY CENTER AP R/1-- 1991 '700 BROADWAY SEATTLE#WASHINGTON 98122 V c-, (206) 292-2771 u6bJl W6rks STREET FILE THE FOLLOWING IS A LIST OF NORTHWEST KIDNEY CENTER PATIENTS IN YOUR DISTRICT WHO CURRENTLY HAVE DIALYSIS MACHINES IN THEIR HOMESe IT WOULD BE SINCERELY APPRECIATED IF YOU COULD NOTIFY THEM IN ADVANCE OF ANY SCHEDULED SERVICE INTERRUPTIONS SO THAT THEY COULD SCHEDULE THEIR USE OF THE MACHINE ACCOROINGLYe ROWLAND*- JACK L- :?90 BEACH PL APT 501 EDMdND S WA 98020 (206) 774-1902 03-18-81- CITY OF EDMONDS 200 DAYTON EDMONDS WA 98020 % PAGE I ,NORTHWEST KIDNEY CENTER 700 BROADWAY SEATTLE9WASHINGTON 98122 206) 292-2771 RECEiVED 1 981 THE FOLLOWING IS A LIST OF NORTHWEST KIDNEY CENTER PATIENTS IN YOUR DISTRICT WHO CURRENTLY HAVE DIALYSIS MACHINES IN THEIR HOMES* IT WOULD BE SINCERELY APPRECIATED�-IF-YOU',COULD-NOTIFY THEM -IN ADVANCE OF ANY - SCHEDULED SERVICE INTERRUPTIONS SO'THAT THEY COULD SCHEDULE THEIR USE OF THE MACHINE ACCORDINGLY* ROWLAND9 JACK L 200 BEACH PL'APT 501 EDMONDS WA 98020�� (206) 774-1902 s rREE 7- June 4, 1974 Mr. A.G. Johnston Johnston Trenching Service Post Office Box 597 Lynnwood, Washington 98036 SUBJECT: Right-of-way Invasion Permit No...74-37 for Storm Sewer Work at Ebb Tide Apartments Dear Mr. Johnstono Inspection of the subject work has been made and found satisfactory to the City of Edmonds. The enclosed check in the amount of $150, posted in lieu of a resotration bond is released and attached herewith. Yours very truly CITY Or EDMORDS RICHARD H.' ALLEN Assistant City Engineer as Encl. 40 '2 CITY OF EDMONDS ENGINEERING DEPARTMENT. 505 BELL STREET EDMONDS, WASHINGTON 98020 APPLICATION FOR INVASION OF RIGHT-OF-WAY (Submit In Duplicate) Pe'rmit to be issued to: Johnstait'Trenahing Seitvl6e For work at: (address.or vicinit Ebb Tide Apts... .y Type of work to be done: Push pipe unde� roadway oomiect to stqrm.sqwere� (Attach Drawing When Applicable) Owner'. Don Nei SIO'n Name %b Tid a Apts Mailing Address 0 EA=nd8.Wn Pr 8-40 27 city State Telephone Number Contractor:- Johnston Tra-riahing Name Bx.597 Mailing Address A -wine 778.451,iD: city State Telephone Numb er Signatlure: (3, ON OWnei. or'Agent Me fiffned 0— Da DO NOT WRITE BELOW THIS LINE (Tio_�be completed by Issuing Agency) Permit Number Permit Issued (date) Remar6. 'y' Amok ENG.INEkR/1APPROVAL DATE Upon issuance of this permit, Ahe contractor is responsible Work subject to inspection and, restora"tion in accordence for -workmanship and materials for a period of 'one year with city code. A 24 hour notice 6'required for in�spection. following inspection of the restoration by the Engineering Call:715-2525 Dept. CITY OF- ENVONDS ENGINEERING DEPARTMENT Insp Date4--5-7.4-By..4;�,..L.j.:Z- InspDate. ---------- ----- By ....................... �Remarks ......................... .............. ----------------------------------------------- InspDate .................. By ........ ............ . Remarks- .................................................................................... InSpl; e --- ----------- -By .......................... Remarks ................................ . ...................................................... Fina ... A,-B . ........ 0 7 -E 7- 72- WE7,E�= jL� =A/ -67 7 IqKo L/7- --S� A7:11 '17-IeE�7 7-0 I.W. /-/. c " E;: !v i=T A111h la�:_ GEoENGINEER�� FIEMIREPORT' File Nurnber 11 136�00 1 -00, TO 100 Project: Date: Ebb Tide Condominiums, Un . i t # 10 1 Floor/Patio, S . I - ab July 16,2004 8410 154" AVENUE NE REDMOND,-WA 98062- Repair (425) 861-6000 Owner Tim of,Adval: Report Number Ebb'Tidle Cond I orniniums 0845 FR.7�16-04 Prepared by: Location: Time of Departure: Page: Boyd Benson Edmonds Wa6ington 1430 1 of.12 Purpose of visil:, Weather., Travel Time: Perrnit Nurnber Special Inspec I tion: Pin Pile Ingtallation Sunny, warm 1.75 2004-0525 (Edmonds) .Upon arrival to the site I assess personq),safety hazards: 0 r Yes -or (3 Referred to &16,Safety. Plan and Safety Tailgate it applicabia ed SafityHazeids.WereAddressadby:0 Staying Nen to Construct- and Equlpffor�tlllazards 00ther(descri") Gleneral I visited theEbb. Tide Condominiums at the request lens Johanson ofCorke Amento, Inc. to complete special 'Unit, 'inspections duiring. pin -pile installation -for the #40'.1 Floor/Patio Slab repair -work. The Ebb Tide Condominiums are locate within a 4-story buildi�g o - n the shore of Puget Sound, at 200 Beach Place� in Edmonds, Washington.. The special inspection visit was completed as. p;ift of the City of, Edmonds permit "I d "'Ci requ.trements as. summarized in the document tite .1ty of Edmonds Special Inspection and Testing Agreement.'" Our services were com leted i.ii,gqneral accordance With our Change Order.No. 2 dated May 18, 20.04, and authorized by the Cory Heins,of the Ebb Tide Condominium Association.on July 8, 2004. When I ' arrived at the site_�,!4-met with Josh Krau ' s ' e'of NW Tearnworks (General Contractor) and �Carl Burris, Justin Riunis, and Adalberto Martinez of Pacific Piling and U . nderpinni . ng (pin- pile'. installer). I observed the following: • A 1-fdot wide.jeast-'Wd�t), 26-fobt long (h6r6'-south) strip of concrete -been removed. along.the west edge of the file --covered concrete patio slab �v Unit #1'0 1. The, east -ed g'e of the r6mcved.s.tfip.'had been saw cut and the west edge of the'. removed strip mas coincident with the east edge of th e exposed aggregate concrete -courtyard. A 4- to 6-iPch void was observed -beneath the patio slab (see Photo Sheeti). No vdids''were ob�served beneath the exposed. aggregate courtyard slab along th . e saw cut trench. • Concrete and other construction waste had -been stockpiled'and covered with a tarp within the courtyard area. Pin Pile Installation 0 Plywood sheets were p laced against the windows and sliding doors of Unit #101 to protect them from breakage (see attached photo sheets). THIS FIELD RE00FIT IS PRELIMINARY F1 EPRESENTATIV DATE, A prelirninivy repon is provided sdely,as evidence that field observation, was; perforrned. Observations and/or conclusions and/or recommendations conveyed in the. final report May va-ry from prWirnfrurry'report- and shall fike precedence ovei t1i6se.indIdatbal in a TI�IiS FIELD R . EPORT IS FINAL A final report is an Instrurnent of p!otessionei service. my conclusions drawnl from this report should be discussed with and fwalualed by thq'prolessional involved. WEVIEWED' BY DATE ------- This repon presents opinions lonned as a rosu . 11 of our observation of activitiesjoi-ing, to our services only. V�49, r . O!y an the coninactor to corrpf� with the ptahs and spe�lfi . cation throughout the duration Of the project iftespective of dia 6resinda of ou!"representative. Our work ades not includiI s6pervislon or direction of the wo* of others, Our firm will not be'respFdble,for o! others on this f3r,01.0ol DISM�MER: Any'electron'ic form foctiit�il; of hard C�pyof the:66gii�� do6urnani (a Mil text. tf�Ae. arxUar no . ure) If provided, and , any nly a copy of the ofig P cjo� The orfgJ9af document is stored,by GeolEngipears, Inc. and will serve qa!�q, 6111clal ilocurneni of record. - Attachments: Pile Site.Plan, Photo Sheets (3 pages�, Pin Pile Installation Record sheets '(2 pages), Pin Pile Test Record sheet, Certificate of Certification -'for the t6st �am (3 Oag,es) Distribution: Corke Amento h (Jefis, Johanson: uo anson@corkeaf;ne-hto.corn Pacific Engineering Technologies m f in (Mark Uchimurx muchimuta@pacehqtec:h.co'_ and Underpi" ning , (Carl'Burris fax 425-486-40 . 25), J,. Paci ic Pile NWTeamworks (Josh Krause: irifo@nmeamworks.coin , TAT, File JUL 2 12004 PERMITCOUNTER File�Nb. 1.1136-001 -00, TIMIOO July'16, 2004, Pin piles were insta*lldd by:P'cific Piling and'Underpinning �y a i o The, pin piles -were installed, using a,140-pound� hand operated pheurnwicJack-lian-uners. 9 �The.pin, piles consisted ol"5.254bot lohg lengths of 27inch diameter A8TM. A53 Grade. A ERD 'S.ch6dule.'80 pipe. • Slip connections between the piles c6isi'sted of 1.75�-inch steel bar. The connections were 12- .inches long 'Willi a 2-;inch long sleeve [pre-welded'at't . he mid.dle of:the. bat for a total apparent additional pile length of 2-inches once installed. No. welding was completed during.the installation. • Five piles were installed at 6.5 foot int6rvMs along the centerl-ine of the -trench (see attached . pile plan) I • The piles were advanced unti[ embedment rates of less than 1-inch per n-finute were attained at embedment depths of 17 to 25 feet (speattached Pin. Pile InsidliationRecord summary'sheets). • The piles were cut-diff -at qpproximatOly,94nches- below estimated finish. slab elevation per NW Teamworks. o Pilecaps consisting of a 1/4-inch thick, 4-inch by 4�inch plate that had been Welded on tb 18-indh long 1.75-inch steel baeg were,slipped'ipto the too -of each pile. The steel bars of �some of the pile caps were cut down to 1.2-inches in l6ngth to avoid interference. with slip connections per the structural engineer (Mark.Uthimdra of Pacific Engineering Technologies). Pin Pile #1 was load tested by Pa * cific Piling And Underpinning • A load test criieria of-8,000 ouhds was!S p , pecified,(200% of the 4,000 pound design load) with less than 1/7.-inch. of additional embedme.pt. t • The,loadlest was completed with a Simplex 100-ton ram reacting against a steel load frame that was, bolted.to the building. An Enerpac gage and hand. pu ' mp were used to charge the ram. • An incorrect gage calibration relationship* Was used during. the. initial load test and Pile #1 was loaded in excess of the t6qui.red test criteri�. Pile #1 was loaded -to approximately 11.25 . 0 pounds (1,000 psi -gage pressure) with 0.084 inches o f additional embedment and then to approximately 10.500 pounds (1,700 p4i gage pressure) which resulted . in additional embedment of 1.75 inches (see attached P1 , n Pile Installation. 1�ecord summary sheets). • Pile #1 was- unloaded and then driven with little or no.embedment following the initial load test. The'load test was repeated using the correct'gage calibration relationship. A load of 8,100 pounds (approximately 200% of the 4,000 pound design load) resulted in a total of 0.019 inches of .additional embedment. The 8,100 pound load was niaintaindd-fdr-10 'minutes. • Based on our,observations- and measurements, Pile#I met. the required load test criteria. It is our opinion that Piles.#2 through #5 also , meet the required load criteria because of the�consistent installation activities at the -site. (D Co W (P M LU Co 'a C� 0 a) X- U) 0 0 �2 0 Go UI) 04 W X Looking southeast it Unit #101 I I 12-inch wide saw cut trench at1west edge of Unit #101 patio slab. Note the 6-inch void beneath the patio slab. No void was observed.beneath the exposed aggregatebourtyard slab to the, west.(right) Ebb Tide Condominium: July 1.6, 2004 GWENGIREER��r Earth Sciences + Technology Photo Sheet #11: Pin Piles CO S CO LU LU CO 4) CO ID C' �2 01 00 UO 04 9; 01 W cr Driving Pile #5 (north end of trench in foreground) and #1 (south end of trench in background). Piles are:2-inch diameter driven with a 140-pound I 2-inch long, 2-rinchdiameter sleeve IFN 77-77, A" )c 4' x 4"Pile. 12-inch long slip coupler �Ieft) made with 1.75-inch steel bar and 2-inch long sleeve and slip pile cap (right) made from 1/4-inch thick, 4-inch by 4-inch plate welded onto 18-inch long 1.75-inch steel bar. Note: some of the top plate bars were cut down to 12 inches to avoid interference with slip couplers. GEoENGINEER Ebb Tide Condominium: July 16, 2004 Earth Sciences + Technology Photo Sheet #2: Pin Piles W LU (0 ia C� M W C) 00 Ln CI4 59 LLI cc Pile #1 load test. Note steel reaction frame (left) bolted to building. I Gage pressure at -720 psi resulted in ram force of -8,100 pounds or -200 percent of design load. A total of 0.079 inches of additional embedment was recorded during the load test. Ebb Tide Condominium: July 16, 2004 GMEKGIREEA��r - Earth Sciences.+ Technology Photo Sheet #3: Pin Piles !L'Aa To OF 1—c- L3RD iall 0 lim Q--NIT #101 �L45 , A14D CL6. REMAIN .......... ......................... H7.7-7.. ................ ............ ...... .......... ............ . ..... ............. ............ . . . . . . . . . . . . . . . AIR. . . . . . . . . . . . . . . . . . . . ............ ..... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . ......... . .... . . . . . . . . . . . . . . . ... ........ ...... ................... ................. . .... .................. * ................. ............. ....... .............. . ................... !- L-1 ................. . ........... ..... . ........... ........ ......... ............. .. ....... . ............ . . .... ............. ---- -- - *::,.*::::,.:::::: . .... . ................ . ............ F -*.,.,., . ........................ = .... . . ....................... .......... . ... . ........ ......... ............ *-"-7 ........ ........ ................ . ..... .... .............. ............. ...... ...... ................ .................. ......... .................. ... ......... .......... ........................ ................... ................... .. ......... .. ............... f.*.'.*.'.'.'.*.*.*.*.*.*-* ... ...... . s ....... .......... ...... .............. ... ...................... = .......... .................... . .......... ............................................. ........... .............. (5) 31 0011, PLES EQUALLY S�)ACED, Itsda SR-A-E-DE BEAM COINT. BOY. SET "C"ELS INTO EX16T. TO MATCH REINF. EET EPDXY EA. END SCALE-.1/4" = -1. .01. E�<15T. COURTYAJ SLAB ANb cmu WALL TO'REmAiN PIP I PROPOSE;, FLOOR Dff,- CONC. To�_. PIN PILE INSTALLATION RECORD /qid jqAMA16-It (#AJID MEL-0 ) W/ wA lFile: t - a �en r) r PIM FILES 11-ocation: F'qq Tl D E M- . , k PIP. lID97 P 1/4 9 Lf PIN PILE INSTALLATION RECORD NOO YAM'mEfZ ZHAAD OL-�). A lFile: 111^36 -oo,-t -00 6,DAAo/QDS V) LQcatioh: 12f c A*I)OAA'^3'u'05 ?-/Z Uj c!F 'NIT ULJ C/> 0 ---------- E U) CD 04 cx co w ui n ... .... ..... x , j / LL V,\ x of I I Lu Y-4 f I'M Al I GE6ENGINEER��r January 30,'2004 Corke Amento, Inc. 710 Second Avenue, Suite 820. -Seattle, Washington 98104 Attention: Cory Heins, c/o Jens Johanson Subject: Report Settlement Evaluation Ebb Tide Condominiums, Edmonds, Washington GEI File No. 1113 6-001 -00 INTRODUCTION GeoEngineers is pleased to present this report summarizing our evaluation of the settlement at the Ebb Tide Condominiums in Edmonds, Washington. The purpos' e of our services is to evaluate settlement of a portion of aliving room and patio slab at Condominium Unit #101, settlement of an adjacent wall, and general settlement within a courtyard area west of the building. Our services were completed in general accordance with our December 3, 2003, proposal authorized by Cory Heins of the Ebb Tide Condominium association. The location of the site is shown on Figure I ' Vicinity Map, The Ebb Tide Condominium building is located at 200 Beach Place adjacent to the shore of Puget Sound in Edmonds, Washington. We understand that'high tides and winds during a storm on October 28, 2003, resulted in.waves overtopping the beach wall and flooding a courtyard area located on the west side of the building and the bottom floor of the building 'to a depth of approximately � feet. A portion of a living room and patio slab of Unit #101 on the ground floor Was found to . have settled approximately I to 3 inches following the flooding. An adjacent wall- that extends to a height of ap proximately 2 feet above the courtyard surface also settled and tilted away from the building. SCOPE OF SERVICES The purpose of our services is to document ' settlement at the site, evaluate subsurface conditions beneath the settled floor and patio slab and adjacent wall, and recommend conceptual . settlement repair alternatives. No specific design plans for repair of the building are included in our scope of services. We recornmend that the results of our service . s be reviewed upon completion and. used to assist in generation of specific repair design plans. Our specific scope of includes: 1. Review maps and references relative to the project area currently in our files. .2.. Complete a general reconnaissance of the site and measure and document the amount of settlement at the patio slab and wall. 3. Subcontract a cofing contractor to core three 8-inch diameter holes throug I h the concrete slab in the settled patio and adjacent area and one 8-inch diameter hole through the concrete slab adjacent to the north courtyard wall. _7' Eaf*,S��Yq�q.* Tep rtc�logy� ff Ir' webs Corke Amento, January 30,2000. Page 2 4. Complete hand auger explorations to evaluate subsurface soil and groundwater conditions at the site of the four concrete core holes and at one location adjacent to the settled wall. 5. Complete hand driven relative density drive -probe tests at the site of the four concrete core holes. 6. Develop conceptual repair al ternatives based on the results of our evaluations. 7. Summari ze the results of our evaluations in a letter report that includes our professional opinion regarding the cause of settlement at the site and conceptual recommendations for settlement repair options. SURFACE CONDITIONS .GENERAL The Ebb Tide Condominium building is located on the shore of Puget Sound in Edmonds, Washington. The five -story building consists of residential condominiums with a parking area immediately east of the building and a private courtyard immediately west of the building. A 2-foot high stucco -coated cement masonry unit (CMU) wall. separates the courtyard from a City of Edmonds park to the south and.the beach to thewest (see Figure 2, Site Plan, and Photographs in Appendix` B). A 6-foot high CMU - wall is located on the north edge of the courtyard. Tle courtyard surface consists of an exposed aggregate concrete surface with occasional planter areas. Sumps with electric pumps are located at the southwest and northwest comers of the courtyard. : The ground surface in the vicinity of the building is 'generally level and situated slightly above sea level with a narrow sand beach immediately west. of the private courtyard. Residential and commercial buildings are located adjacent to the building. Tle Edmonds -Kingston ferry terminal is located north of the building and the Edmonds Marina is located south of the building. We understand that the City. of Edmonds Park located south of the site was reconstructed in 2003. Based on discussions with m' embers of the Condominium Association, the reconstruction included remo . val of old pilings and installation of a new bulkhead along the shore of the park using vibratory equipment and heavy cranes to install the piles which are part of the new bulkhead. Based on the September 4, 1964, architectural and structural plans for the building titled "20-Unit Apartment., Edmonds, Washington" (Charles , Morgan and Associates, Architects), the building is supported on treated wooden piles driven.to a 20-ton capacity. Tlie tops of the piles are connected and bridged by a series of concrete grade beams that in turn support the concrete floor slab and CMU walls. Concrete patio slabs are shown extending 8 feet to the west of the building. The slabs are shown to be 4 inches thick and reinforced with steel mesh. The private courtyard and walls are not shown on the plans. Instead, the plans show the beach surface sloping down to the west from the west edge of the. patio. EVIDENCE OF SETTLEMENT GeoEngineers completed visits to the site on December 16 and 22, 2003, to observed site conditions and complete evaluations. Settlement was observed at Condominium Unit #101 at the southwest comer of the building and within the private courtyard area west of the building. The north, south, and east portions of the building were not examined during our evaluation as there were no reports by the residents of settlement in these areas. G e o E n g i n e e r s FfleNo. 11136-001-00 Corke Amento* January 30, 2004 Page 3 Condominium Unit #101 Condominium Unit #101 is located on the ground floor at the southwest comer of the building. An approxiii ately 5-foot deep (east -west), 1.4-foot wide (north -south) extension of the condominium's living room extends west onto the patio area. The roof of the living room extension consists of the overhanging deck of the unit above and the west face of the extension consists of aluminumclad sliding glass doors and windows. The south wall of the extension consists of the original CMIJ wall for the south side of the building and the north wall of the extension is faced with stucco and appears to have been instilled after the main building was constructed. The living room extension appears to be located west of the pile - supported section of the building. Evidence of significant settlement was observed along the top and base of the windows and sliding gla * ss doors. Approximately 1 -.to 3-inches of vertical separation was observed between the top and base of the sliding glass doors and window firaines and the adjacent wall sections. Horizontal gaps ranging from 0. 1 - to 0.3 inches were also observed between the adjacent window and sliding glass door sections. In addition, a vertical separation of approximately 0.6 inches was observed at the base of the north wall of the living room extension. Based on our visual examination, no evidence of significant settlement was observed adjacent to the courtyard at the other ground floor condominiums, units #102, #103, and #104. Evidence of significant settlement and tilting was also observed at the wall immediately west of the living room extension. Five vertical cracks, ranging from 0.l.to 0.5 inches wide, were observed at the wall and the top of the wall was observed to be tilting slightly out to the west. Horizontal separation of approximately 0.35 inches was observed between the base of the wall and the adjacent patio slab. No evidence of other gaps or paths for transmission of water or soil was observed in the vicinity of the settled wall or Unit #10 L Based on discussions with members of the Condominium Association, the settlement at Unit #101 occurred during or immediately following the flooding event on October 28, 2003. We understand that the courtyard area and adjacent condominiums were flooded to a depth of approximately 2 feet during the flooding event when storm waves overtopped the west wall. We also understand that the electric sump pumps located in the courtyard area did not flincti-on during the flooding event because of a power outage. Private Courtyard Area The private courtyard area is located on the west side of the building and is approximately 100 feet long (north -south) and 30 to 36 feet wide (east -west). The courtyard surface is composed of exposed aggregate concrete with occasional planter areas and. is bordered by CMU walls to the south, west and north. The courtyard area does not appear on the September 4, 1964, architectural and structural plans and appears to have been constructed after that time. Evidence of general settlement was observed within the courtyard area. The evidence included several V8-inch to Y4-inch wide cracks with vertical offsets up to V2 inch throughout the courtyard area. In addition, the east edge of the courtyard appears to have settled approximately 0.5 to I inch below the west edge of the patio area connected to the building.! Settlement appears to have also, resulted in an approximately 0.5- to 1.5-inch vert ical gap beneath an approximately 14-foot long section ' of the CNW wall at the north edge of the courtyard. Based on discussions with members of the Condominium Association, the settlement within the courtyard area occurred during the last few to tens of years. G e o E n g i n e e r s ReNo. 11136-001-00 3 Corke Amento, January 30, 2000 Page 4 SUBSURFAC� CONDITIONS LOCALGEOLOGY Based on the maps tilted "Preliminary Surficial Geologic Map of the Edmonds East and Edmonds West Quadrangles" (Mackey, 1975) and "Coastal Zone Atlas of Washington, Snohomish County" (W;shington Department of Ecology, 1977), the site is underlain by modified land composed of artificial fill. Based on the maps and topography, we mifer that the site and general vicinity was likely a broad low- lying beach or an estuary prior to placement Of artificial fill. Based on discussions with members of the Condominium Association, we understand that a sawmill was located at the site some years prior to construction of the building. SUBSURFACE EXPLORATIONS GeoEnginqers completed subsurface explorations at the site on December 16, 2003. The explorations included coring holes in the concrete slab and completing hand auger and drive probe evaluations. Voids, from 4- to 6-inches deep, were encountered beneath the concrete slab near Unit #101. Ile voids were found to extend laterally 2 to 7 feet beneath the concrete slab near Unit #101. The presence of voids beneath the concrete was also evaluated during the December 22, 2003, visit by tapping the concrete surface with a small hammer.;.Areas of known voids near Unit #101 had a hollow sound when tapped with the small harnmer. In addition, the concrete landing slab at the courtyard access door between Units # 103 and #104 appeared to sound hollow. Hammer sounding tests elsewhere were inconclusive because of the presence of ceramic tile on the concrete or differences in concrete type or condition. The results of the hand auger and drive probe evaluations are summarized below. Hand Auger Explorations A total of five. hand auger explorations were completed at the site. Representative soils samples were collected from the boring's and were visually classified by a representative from GeoEngineers. The approx. imate locations of the hand auger explorations are shown on the Site Plan, Figure 2. Logs from the hand -auger explorations are presented in Appendix. A. Subsurface conditions encountered in the four hand auger explorations completed in the slab area (HA-1 to HA-4) include fine to medium sand with varying amounts of -slit and concrete/organic debris to the bottom of the explorations at 2 to 5 feet. Deeper hand auger explorations in the slab areas were not possible because of caving sand. Subsurface conditions encountered in the hand auger exploration located immediately west of the wall adjacent to Unit # 101 (HA-5) consist of a thickness of 1-foot of topsoil overlying fine to medium sand with silt and occasional gravel to a depth of 5 feet. - Soft peat was encountered from a depth of .5 to 6 feet. Fine to medium sand with silt and occasional gravel was encountered from a depth of 6 feet to the bottom of the exploration at 6.5 feet. Drive Probe Evaluations A total of four hand drive probe evaluations were completed at hand auger locations HA-1 to HA4. The drive probe evaluations were completed using an 11-pound slide hammer used to drive Y2-inch diameter steel pipe. The number of 30-inch drops of the hammer needed to drive. the steel pipe for each 1-foot interval of depth were recorded at each site to estimate the relative density of soil at the tip of the G e p E n g i n e e r s FfleNo. 11136-001-00 Corke Amento,* January 30, 2004 Page 5 probe. The drive probe evaluations completed in the slab area adjacent to Condominium Uni t #101 (HA-1 to RA-3) suggest loose to medium dense soil conditions from the surface to depths of 6 to 7.5 feet. Refusal in dense to very dense soil conditions was encountered beneath the loose to medium'dense soil at 6 to 7.5 feet. The drive probe evaluation completed at HA4 near the north courtyard wall encountered refusal on concrete at a depth of 2 feet. CONCLUSIONS GENERAL I Based on our evaluation, both short-term and. long-term settlement damage has occurred at the Ebb Tide Condominiums. Settlement damage in the private courtyard area west of the building appears to be'the result of long-term settlement from soil consolidation or soil loss beneath the slab area. Settlement damage at Condominium Unit #101 appears to be the result of short-term settlement directly related to loss of slab support from flooding on October 28, 2003. We understand that the City of Edmonds completed improvements at the park located immediately south of the site in 2003. Vibrations associated with removing old bulkhead piling and installing new bulkhead pilings at the park may have contributed to settlementat the Ebb Tide Condominiums. However, without vibration and settlement monitoring data collected at the site it is not possible to show a direct cause -and -effect relationsh ip between vibration during the City of Edmonds work and settlement at the site. SETTLEMENT IN COURTYARD AREA Based on the results of our explorations and review, relatively loose. artificial fill soils ar . e pTesent to a depth of approximately 6.5 to 7.5 feet below the ground surface at the site. The presence of the artificial fill likely influenced the decision to use a piling system to support the building as described on the September 4, 1964, architectural and structural plans. However, the courtyard area.appears to be supported only on underlying soil. Long-term consolidation by loading and/or re -sorting. of the. fill material to a more dense condition by flowing water likely has. resulted in settlement of the courtyard slab. Alternatively, the settlement may be associated with decomposition and degradation of organic materials such as the peat material encountered in HA-5 or logs or other debris within the artificial fill at the site. Cracks are present in the courtyard area slab. The cracks are largely aesthetic issues and do not significantly impact the. slab performance. However, infiltration of water through the cracks could impact subgrade soils. In addition, the cracks may present a tripping hazard. -Grinding and sealing of the cracks will likely reduce the risk of water infiltration and tripping. Slab settlement beneath the wall at the north edge of the courtyard does not appear to currently affect wall performance. However, continued slab subsidence could result in future wall damage. Filling of the void beneath the wall with grout or concrete will likely reduce the risk of future wall damage. SETTLEMENT AT CONDOMINIUM UNIT #101 Large -void spaces, 4- to 6-inches deep and extending laterally up to 7 feet, were encountered during our explorations beneath the concrete, slab at, and immediately adjacent to, Unit #101. Weconcludethat flood water from the October 28, 2003, storm event flushed soil out from beneath the non -pile supported G e o E n g i n e c r s ReNo. 11136-001-00 Corke Amento January 30, 200 Page 6 portion of the living room and patio at Unit #101. The flood water likely flowed from the surface to the subsurface through the gap between the wall and slab at this locatiom Soil removed from the beneath the slab likely flowed into voids beneath the pile supported building. Alternatively, soil may have flowed into voids associated with buried organic materials or debris. The loss of support and significant settlement damage appears to be constrained to areas where voids are present beneath the unsupported slab area. The adjacent building area supported by pile foundations appears not to have settled. No evidence of significant settlement was observed at nearby Units # - 102, #103, or #104 on the ground level. However, these units could experience settlement damage sirnilar to that of Unit #101 should future loss of soil support occur. FOUNDATION REPAIR RECOMMENDATIONS GENERAL Our general recommendations for foundation improvements at the Ebb Tide Condominiums in Edmonds are summarized below. These recommendations are based on our current understanding of subsurface soil and groundwater'conditions at the site and the planned improvements as discussed during our meeting at the site on December 22, 2003. We recommend the use of pin piles or helical piers to underpin support the settled portions of the concrete slab area and adjacent CNW retaining wall. Our recommendations may be applied to the settled portions of Condominium Unit #101, the adjacent patio area, the adjacent wall, and portions of the private courtyard, as appropriate. The following recommendations should be supplied to a structural engineer to design appropriate construction plans. We recommend that GeoEngineers review the final design pl ans prior to construction. PIN PILES General Pin piles generally consist of 2- to 6-inch diameter steel pipe driven using a hydraulic. hammer mounted on relatively small and lightweight portable or tracked equipment. Pin piles are typically driven to practical refusal, which is generally defined as I inch of p en etra tion i n a time period of about 15 to 20 seconds depending on' the pipe size and harnmer weight. Single pipe sections up to 21 feet long can conn nonly be driven into the ground and additional pipe sections can be added until the required refusal criteria are obtained. The pin piles can be driven to variable depths and through deep soft ground conditions until the desired capacity is obtained. Although the pin piles provide some stiffness, we recommend that lateral support for the foundation improvements be.provided through a structurally designed connection to the existing building or other appropriate method as determined by the structural engineer. Pile Lengths Pin piles should extend at least 16 to 20 feet below the ground surface and a minimum, of 10 feet into the medium dense to dense sand. deposits, whichever. is deeper. If the refusal. criteria is not achieved or the design, capacity not met at these lengths then additional pipe sections must be added and the piles driven deeper until the required capacity is met. We recommend piles having a minimum length of G e o E n g i n e e r s FfleNo. 11136-001-00 Co'rke -Amento, 9 January 30, 2004 10, '40 Page 7 25 feet be used for planning and estimating purposes. Load tests as recommended in a following section may indicate that less penetration will be sufficient to provide the required design capacity. Pile Type and Driving Criteria We recommend that all pin piling be 3- or 4-inch extra strong ASTM A-53, Grade A, galvanized, Schedule 40, steel pipe. We recommend that the pin piles be driven using a 650-lb. (3-inch pipe) or a 850-lb. (4-inch pipe) hydraulic hammer at a rate of 550 to 1,100 blows per minute. the piles should be driven to practical refusal, which is defined as a rate of at least 14 to 16 seconds per inch of penetration. We recommend that the pin pile contractor evaluate the use of closed -end pipe piles to increase the driving resistance in the fine to medium sand underlying the site. If the driving criteria stated above are. met, it is our opinion that the 3- and 4-inch pin piles will provide allowable axial bearing capacities of approximately 4 and 6 kips, respectively. We recommend geotechnical inspection and load te sts on at least 5 percent of the piles (minimum of. one pile test).. The load test should be in general accordance with ASTM Standard D 1143-81 for static axial compressive loads on piles. "ne load tests should be performed by loading the piles in 25 percent increments up to 200 percent of the design load. -A load test would be considered acceptable if there is less than Y2 inch of vertical movement under the:.test load. Tle. 200 percent load should be held for a minimum of ten minutes to monitor vertical movement. The pile load tests may determine that shorter piles can be used than those driven to practical refusal. We recommend that the load tests should be completed on the first pile at each location so that penetration requirements can be adjusted accordingly for the remaining piles at that location*; Helical Pier. Foundations Helical pier foundations are *generally screwed into the ground to the desired depth or until specified resistance criteria are met. The piers have a square shaft 1.5 to 1.75 inches on a side and typically come in standard lengths up to 10 feet long. A single helix or multiple helices can be welded to the shaft to achieve the bearing capacity requirements. The helices on the shaft range from 6 to 14 inches in diameter. Based on our evaluation, the helical piers must have at least one 10-inch helix screwed in to a depth . of at least 14 feet to provide an allowable axial bearing capacity of approximately 4 kips. If a 12-inch helix screwed into a depth of at least 14 feet is used, an allowable axial bearing capacity of approximately 6 kips would be provided. The piers should be installed such that the helix is drilled at least 4 feet into the medium dense to dense sand deposits located at a, depth below approximately 7 to 8.5 feet below the ground surface. The recommended minimum length of 14 feet will typically require at least one joint for each pier foundation. Helical shaft joinU typically have a significant amount of slack. For this reason we recommend that lateral support for the foundation improvements be provided through a structurally designed connection to the existing building st ructure or othei appropriate method as determined by:the structural engineer We recommend that a load test be performed on the first helical pier installed at the site by loading the helical pier in 25 percent increments up to 200 percent of the design load. A'load test would be considered acceptable if there is less than Y2 inch of vertical movement under the test load. The G e o E n g i n e e r s FfleNo. 11136-001-00 Corke Amentolp 0 January 30, 200 Page 8 200 percent load should be held for a minimum of ten,minutes to monitor vertical movement. The load test will provide verification of the allowable axial bearing capacity with an empirical correlation that is based on torque measured during installation. Due to the proximity of the site to the salt water in Puget Sound, the helical pier foundations will be susceptible to corrosion. We therefore recommend that galvanized steel or equivalent corrosion protection be used in the de8ignof the helical piers. CONTRACTOR SELECTION We recommend that the installation of pin piles or helical piers be completed by a contractor experienced and sldlled in this method of repair. We can provide the names of two or three such experienced contractors if requested. MONITORING AND TESTING In addition to monitoring the pin pile and helical pier load tests, We recommend that installation monitoring be completed by GeoEngineers to verif� subsurface conditions and installation procedures. Installation monitoring should consist of observing the installation of each pin pile or h.elical pier and recording the length of each pile or pier below grade and the penetration resistance. Any unusual conditions encountered during ' installation should also be recorded. The purpose of the monitoring is to verify the torque or driving resistance and allow modification to the installation requirements if appropriate. LIMITATIONS We have prepared this report for the exclusive use of Corke Amento, Inc., and Ebb Tide Condominiums and their authorized agents to assist in evaluating and mitigating settlement at the Ebb Tide Condominiums. Our recommendations are intended to improve the overall stability of the site and to reduce -the .potential for future property damage related to settlement. However, all construction involves risk, only part of which can be mitigated through qualified engineering and construction practices. Favorable performance of structures in the n * ear term does not imply a certainty of long-term performance, especially under conditions of adverse weather'or seismic activity. Within the limitations of scope, schedule and budget, our services have been executed in accordance with generally accepted practices in the field of geotechnical engineering in this area at'thei time this report was prepared. No warranty or other conditions, express or implied, should be understood. Any electronic forni, facsimile or hard copy of the original document (email, text, table, and/or figure), if provided, and any attachments are only a copy of the original document. The original document is stored by GeoEngineers, Inc. and will serve as the official document of record. Please refer to the Attachment C titled "Report Limitations and Guidelines for Use" for additional information pertaining to use of this report. 4 .0. 0 G e o E n g i n e e r s FfleNo. 11136-001-00 nto, Corke Ame January 30, 2004 Page 9 We appreciate the opportunity to work with you on this project. Please call if you have any questions regarding this report. Yours very truly, GeoEngmeers, Inc. Boyd E. Benson, LEG EXP19E�S KrIIIUVUI%J.'DRUb45xI.� Principal BEB:KGB.mh Redm:\OO\Fi.naIs\I 113600100Rdoc Attachments: Figure I — Vicinity Map Figure 2 — Site Plan Attachment A - — Hand Auger Logs Attachment B — Photos Attachment C — Report Limitations and Guidelines for Use Four copies submitted G e o E n g i n e e r s FiIeNo- 11136-001-00 M All V EBB TIDE CONDOMINIUMS --4 W -_4 UNIT UNIT*103 -02 UNIT #1 Ell7 ... .. ................ ------------- C;" SL-oc' Pilo. 0�1 GAP BENEATH WALL HA-4 M COURTYARD AREA 03 M 0� I OU N, 0 b -0 0 0 Notes: 1 - The locations of all features shown are approximate. N 2. ;,�h[, jigui-6 is for in formational purposes only. It is intended to assist in the identification of.features :2 ,s. . : s ussed in a related document. Data were compiled from sources as listed in this figure. The data ources do not guarantee these data are accurate or complete. There may have been updates to the d: data since the publication of this figure. This figure is a copy of a master document. The master hard copy.is stored by GeoEngineers, Inc., and will serve as the official document of record. Reiere­n'c*e': :'Sheet A—,l, Charles Morgan & Associates, September 04, 1964. HA-8 HA-2 1111111111111M #101 U V IIN%3 NUUM r-A I r-1N1%:dVV4 AN,D SETTLEMENT AREA 4 Ll -5 TILTED WALL Aft WALLf EXPLANATION: 0 20 40 H.A-1 + HAND AUGER SCALE IN FEET GWENGINEE.R�� SITE PLAN Earth Science + Technology FIGURE 2 GEoENGINE.ERS ATTACHMENT A HANDAUGERLOGS WN IV - V A1111111L ANIL SOIL CLASSIFICATION SYSTEM MAJOR DIVISIONS GROUP SYMBOL GROUPNAME GW WELL -GRADED GRAVEL, FINE TO COARSE GRAVEL GRAVEL CLEAN GRAVEL COARSE GP POORLY -GRADED GRAVEL GRAINED More Than 50% SOILS of Coarse Fraction GRAVEL GM SILTY GRAVEL Retained on No. 4 Sieve WITH FINES GC CLAYEY GRAVEL SW WELL -GRADED SAND, FINE TO COARSE SAND SAND CLEAN SAND More Than 50% SP POORLY -GRADED SAND Retained on No. 200 Sieve More Than 50% of Coarse Fraction SAND SM SILTY SAND SC CLAYEY SAND Passes . WITH FINES N a. 4 Sieve ML SILT FINE SILT AND CLAY INORGANIC GRAINED CL CL AY SOILS Liquid Limit ORGANIC OL ORGANIC SILT, ORGANIC CLAY Less Than 50 MH SILT OF HIGH PLASTICITY, ELASTIC SILT -More Than 50% SILT AND CLAY INORGANIC Passes CH CLAY OF HIGH PLASTICITY, FAT CLAY No. 200 Sieve Liqui . d Limit F� RGANIC OH ORGANIC CLAY, ORGANIC SILT 50 or More HIGHLY ORGANIC SOILS PT PEAT NOTES: SOIL MOISTURE MODIFIERS: 1. Field classification is based on visual examination of soil In Dry - Absence of moisture, dusty, dry to the touch general accordance with ASTM D2488-90. 2. Soil classification using laboratory . tests Is in general Moist - Damp, but no visible water accordance with ASTM D2487-90 Wet - Visible free water or saturated, usually soil Is obtained from below 3. Descriptions of soil density or consistency are based on water table interpretation of blow count data, visual appearance of soils, and/or test data. GWENGINEER SOIL CLASSIFICATION SYSTEM FIGURE A-1 fAsoila-l.doc M' #6103 Date Excavated: Logge#�, KHC/BEB Equipment: Hand Auger Surface Elevation (ft). Not determined IF 106163 Date Excavated: Logge#-y: KH Equipment: Hand Auger Surface Elevation (ft). Not detennined W 96/03 Date Excavated: 0 Loggefl- KHC Equipment: Hand Auger Surface Elevation (fty Not determined r � V I Date Excavated: 1003 Loggedf'. KHC Equipment: Hand Auger Surface Elevation (ft)- Not determined 0 'Z� E :3 z MATERIAL �DESCRIPTION OTHER TESTS q > — CL— 4) (D W 0 CL a .2 -C& — CL 0 .0 AND NOTES [FJ C),R E E M Co 0 T 0 0 2 E >1 0 co t . 0 () 0— TS Topsoil SP-SM Brown fine to medium sand with silt and occasional fine gravel (loose, moist) SP-Sm Light brown fine to medium sand with silt and occasional Fine gravel (loose, moist to wet) Fr MWE Dark brown peat (soft, wet) SP-SM Grayish brown fine to medium sand with silt and occasional fine gravel 2 Hand auger completed at 6.5 feet on 12116/03 No groundwater seepage observed Nnor caving observed at I to 3 feet Now. See Figure A-1 for explanation of symbols The depths on the hand auger logs are based on an average of measurements across the hand auger and should be considered accurate to 0.5 foot. LOG OF HAND AUGER HA-5 Project: Ebb Tide Condominiums GEoENGI*NEER Project Location: Edmonds, Washington Figure: A-6 Project Number: 11136-001-00 Sheet I of 1 �jj )pN, 77-7� t-,- Ml �7 _Al Ebb Ebb Tide Condominium: December 16,2003 Photo Sheet #13-1, Patio XV 6N rZ 'e� 'rc , N �lfa OR I � J, aw1m, 'i 4iA, GEoENGINEERS Ebb Tide Condominium: December 16,2003 Earth Sciences + Technology Photo Sheet #13-3, Exterior wall cracks