Loading...
20124 83RD AVE W.PDF111111111111 7733 20124 83RD AVE W t City of Edmonds FILE RIGHT'OF WAY CON T s PERMIT 9-? 3 �"-3 Permit Number. Issue Date: — F A. Address or Vicinity of Construction: 20124 83 Av W (9402133) 11 89 0 9 C) B. Type of Work (be specific): Trintall NAw SAryie-A p C. Contractor: Washington Natural Gas Company Contact: Frank Swan Mailifig Address: 815 Mercer St. Seattle, WA Phone: 224-2278 State License #: 96111 Liability Insurance: Bond:$ D. Building Permit # (if applicable): ' Side Sewer Permit # (if applicable): E. E] Commercial [J Subdivision [I City Project M Utility (PUD, GTE, WNG, CABLE, WATER) E] Multi -Family [J Single Family E] Other INSPECTOR: INSPECTOR: F. Pavement or Concrete Cut: R1 Yes []No G. Size of Cut: 1 (2 x 4) H. Chargq�_$ In Asphalt w#14� @ Gas APPLICANT TO READ A�ND81[GN INDEMNITY. Applicant understands and by his signature to this application, agrees to the City of Edmonds ha iaoplsl damages, or rm gi '-itadepartments or claims of any kind or description whatsoever, foreseen or unforeseen, that may be m against the City ofEd ndWrn7jf employees, including or not limited to the defense ofany legalproceedings including defense costs, and attorney fees by reason ofgranting this permit. THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR PERIOD OF ONE YEAR FOLLOWING THE FINAL INSPECTION AND ACCEPTANCE OF THE WORK ESTIMATED RESTORATION,FEES WILL BE HELD UNTIL THE FINAL STREET PATCH IS COMPLETED BY CITY FORCES, AT WHICH TIMEA DEBIT OR CREDIT WILL BE PROCESSED FOR ISSUANCE TO THE APPLICANT. Construction drawing of proposed work required with permit application. A 24 hour notice is required for inspection; Please call the Engineering Division, 771-0220. Work and material is to be inspected during progress and at completion. Restoration is to be in accordance with City Codes. Street shall be kept clean at all times. -traffic Control and Public Safety shall be in accordance with City regulations as required by the City Engineer. All street cut ditches shall be patched with asphalt or City approved material prior to the end of the working day; NO EXCEPTIONS. W Ihave read the above statements and understand thepermitrequirements and thepink copy of theperm it will be available on;si�te �a�tlnzes fy"'rpection purposes. Signature: Date: November 15, 1993 (Contractor or Agent) CALL DIAL -A -DIG PRIOR TO BEGINNING WORK FOR CITY USE ONLY APPROVED BY: TIME AUTHORIZED VOID AFTER DAYS RIGHT OF WAY DEPOSIT DISRUPTION FEE/FUND Ill: SPECIAL CONDITIONS: OVE—&—t RESTORATION FEE: 4;!s MAW PERMIT FEE: TOTAL FEE: L COMMENTS: RECEIPT FEE. - DATE: ISSUED BY: 0 NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE Engrg. I)iv. 1991 FIELD INSPECTION NOTES Comments: Diagram: CONTRACTOR CALLED FOR INSPECTION Partial Work Inspection by Work Disapproved By: FINAL APPROVAL BY: L "I, (Fund 111 - Route copy to Street Dept.) El XES Date: Date: E1,NO., Addendum to 4Rigb AofWaPy Perm t Appli6ation Submitted by: Guyka Connors Engineering Aide Washinqton Natural Gas 521-5248 �-� #= 94OZ13 5 Z-c:> I:Z4 o3r NQ W- SAN- 5. qj (>ff ffo X I , 'De Nt W11 H N /A WNG to window N14Water main depth unknown gas main -I -/I -g- gas -ss- sewer - water !iydrant S15 Mcrcer St. (P.O. Box 1869). Sunk, WA 99111 (206) 622-6767 APPLICATION STREET FILE for The City of Edmonds SEDE SEWER PERMIT EASEMENT No . ........................ .............. .... . ..... NEW CONSTRUCTION REPAIRS 4 /,0 w- 174 VNER ... )8� OV Ai ........... ZIZ4 .. 1-..,4 ........................................... CONTRACTOR . ... ..... ... ... ... ......... ...... PERMIT N -io - -Vj 17- - --� - - - - - A D D R. E S S ..... /---Q ..... -,/ ....... . ......... ... LEGAL DESCRIPTIC" .... T n— "o. .............................. ......................... ............. ............ BLOCK No . ................... NAME OF ADDITION ...... ..... Approved: DATE.................... ............................ BY 0 NOTICE: N'o ... W a rr a n ty —Of—a-c-c-- -u-r--a-cy. The information *shown on the attached map(s) was compiled for use by the City of Edmonds, its Employees and Consultants. The City of �Edm.onds does not . warrant the accuracy of anything set forth on these map(�-)- Any person or entity'requesting a copy should conduct an independent inquiry regarding the Inform-ation shown on tRe -map(s), including, but not limited to, th'e location of any sewer stub shown. Such sewer stubs may or may, not exist and may or may not exist at the location shown.. Neither the City of Edmonds nor its ernp-1-o-yee-s o-r office-rs -sh-a-11.1 be 11a.b.-IFe for the information given* on this map(s), nor for any one representation provided based upon said map(s). CITY OF EDMONDS Call PRospect 6-1107 when work CIVIC CENTER — WATER -SEWER DEPARTMENT is ready for Inspection. (No inspee, SIDESEWER PERMIT tions Saturday, Sunday or holidays.) N 4 7 ADDRESS----------_---- ZQ12.4 ... 7n ... Qard --- AwLaw�__Ngs.t­ ... ................................................................................................................ OVMER ..................... Ben --- Hal.1 ................... ­­ .......................... CONTRACTOR .... Hyatt ... & --- S.on.s ....... In.c ............................... ....... ........ .. ............. .. . .... .. . Perinission is granted ----- Apr". -A_ ----------------­ 19_7Q, for ------------------------ days to REPAIR or CONNECT a side sewer with City Sewers in accordance with application on file and governing ordinances. ATTENTION IS CALLED TO THE FOLLOWING: NOTE No. 1—The owners of the property may obtain a permit to construct sewer inside property line. A licensed Side Sewer Contractor must be employed to construct side sewer in street area. Do not cover any portion of sewer before it has been inspected. NOTE No. 2—Obtain full information regarding Ordinance 11.16.030 and Regulations governing side sewers when you get permit. NOTE No. 3—Top of side sewer must have at least 30 inches coverage at property line and 12 Inches inside property line; minimum grade of 2%. No bends in grade sharper than 1/s will be permitted. NOTE No. 4—Trenches in street must be water settled and surface of street restored to original condition. Contractors shall be responsible for failure due to improper work which may develop within one year of completion. NOTE No. 6--It Is unlawful to alter or do any other work than is provided for In the permit, or to do any work on the main sewer or its appur- tenances except to Insert the pipe into the wye.