Loading...
202 5TH AVE S.PDF111111111111 5173 202 5TH AVE S ADDRESS: 2- - 6-111 -A ve- :5 00 TAX ACCOUNT/PARCEL NUM13ER: BUILDING PERMIT (NEW STRUCTURE): COVENANTS (RECORDED) FOR: CRITICAL AREAS: *1�( I fv-fq - DETERMINATION: E] Conditional Waiver E] Study Required jj��aiver DISCRETIONARY PERMIT #'S: /4p/3 - q/-/ - qt�? �W -&) - 4 DRAINAGE PLAN DATED: PARKING AGREEMENTS DA EASEMENT(S) RECORDED PERMITS PLANNING DATA CHECKLIS SCALED PLOT PLAN DATED SEWER LID FEE $: LID #: SHORT PLAT FILE: LOT: BLOCK: SIDE SEWER AS BUILT DATED:- SIDE SEWER PERMIT(S) #:- SOILS REPORT DATED: STREET USE / ENCROACHMENT PERMIT FOR: LATEMPOST'sTonnAStreet File Checklist-doc X� 6 PLANNING DATA * New Commercial / Multi -Family Projects ii S TREE T =FILE I Name: t e: rDat� e: 7 Site Address: -0 P I Plan Ch�eck #: BLD Project Description: Use(s) Proposed: Allowed Use;e�ES I NO) CUP File Number: C M —' 4006, OM To Allow What Uses: ArWe, - Legal Nonconforming Land Use Determination Issued: (YES / NO) Reduced Site Plan Provide C_(YE 0) Zoning: Map Page: Comp Plan Designation: 67yz.1 Corner Lote�_NO) Flag Lot: (YE r2), AD13 File Number ftle-wai%Mq): 0(9 LotArea: 112_lci wom Plans Match ADB Approved: (YES / NO) S eline Required: (YES 1(!g> Critical Areas Determination . El Study Required ��Waiver SEPA Determination: pw+ re Exempt '.5m El Needed (for sites with 500 cubic yards of grad ng orFwithin 20=7of Puget Sound or Lake Ballinger. Requires: (1) Fee, (2) Environmental Checklist, and (3) APO List with notarized form). Required Setbacks Street: I Side: 0 1 Side: 0 Rear: 0 ActualSetbacks Street: Side: 0/ Side: ol Rear: Lot Coverage/FAR Required: IVA Lot Coverage/FAR Provided: Lot Coverage/FAR Calculations: IVA -49 Building Height Datum Point: Datum Elevation: Maximum Height: Actual Height: Subdivision: Lot Aggregation Required: Landscaping Landscaping Matches ADI3 Approved: Landscaping Bid Provided: (YES / NO) Bond Amount (100% Bid). - Plan Review By: Is PLANNING DATA 46 New Commercial / Multi -Family Projects 11 STREEiEil Commercial f�arking Analysis Business Name Type/Use Parking Ratio Tenant Area Required Parking Total Parking Required. - Total Parking Provided. Vuld-Famfly Parking Anal is # Bedrooms per Dwelling Unit Parking Ratio # Units Required Parking Studio 1.2/D.U. I Bedroom 1.5/D.U. 2 Bedrooms / W_000,�' 1.89 3 + Bedrooms 2.0/D.U. Total Parking Required. - Total Parking Provided.- Othdr AVV iq 6, Plan Review By: t?4� A I 0 46 O� p4l CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS,WA 98020 PHONE� (425) 771-0220 - F,,xX (425) 771-0221 STATUS: ISSUED Ex' ra ion-- ate'��'l 1312-00T P, '02 5TH AW 91) M 0 NDS I , Project Addl'Fss:2.. Parcel No: 27032' )00407700 PROPERTYOWNER APPLICANT CONTRACTOR BP WEST COAST PRODUCTS LLC ALEXIA INIQUES ESE CORPORATION P 0 BOX 5015 1 10 1 1 WALLER RD BUENA PARK, CA 90622 TACOMA. WA 93446 425-25 1-6222 233-53*;-31 12 LICENSE# eseco"235QA EXP 10/4/2006 JOB DESCRIPTION REMOVE312K UNDER GROUND STORAGETANKS VALUATION: $0 PERMIT TYPE: Commercial PERMIT GROUP 70 -Tanksfhiel GRADING: N CYDS 0 TYPE OF CONST RUCTION RETAININGWALL ROCKERY: N OCCUPANT GROUP. OCCUPANT LOAD. FENCE: N ( OXO FT-) CODE OTHER N ------- OTHER DESC ZONE BC NUMBER OF STORIES: 0 VESTED DAT E OF DWELLING UNITS. 0 EUSMG AREA IBASEMENT: 0 1 ST FLOOR- 0 2ND FLOOR: 0 _7BA-SEMENT PROPOSED AREA 0' 1 ST FLOOR 0 2ND FLOOR 0 13RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0 13RD FLOOR 0 GARA GE. 0 DECK 0. OTHER: 0 FRONTSETBACK SIDESETBACK PLEARSETBACK REQUIRED: PROPOSED: �REQUIRED: PROPOSED: IREQUIRED PROPOSED. HEIGHT ALLOWED:O PROPOSED:O IREQUIRED: PROPOSED SET BACK NOT ES: SEPA DNS issued 6/2/06; appeal expires 6/16/06 I AGREE TO COMPLY WIT H CIT Y AND ST ATE LAWS REGULAT ING CONST RUCT ION AND I N DOI NG T HE WORK ALIT HORIZED T HEREBY, NO PERSON W ILL BE EMPLOYED IN VIOLAT ION OF T HE LABOR CODE OF T HE ST AT E OF WASHINGTON RELAT ING TO WORKMEN'S COMPENSATION INSURANCE AND RC%V 18 27 HIS APPLICATION IS NOT A PERJAIT UNTIL SIGNED BY T HE BUILDING OFFICIAL OR HISIHER DEPUT Y AND ALL FEES ARE PAID Signature Print Name Date Relea ATTENTION ITIS UNLAVVFUL TO USE OROCCUPYA BUILDING OR STRUCTURE UNTIL A FINIAL INSPECTION HAS BEfN MADE AND APPRO\'.M- OR A CERTIFICATE OF OCCUPANCYHAS BEEN GRANTED. UBCI09 IBCIIO IRCIIO E:1 ARCHIVE F-1APPLICANT F—] ASSESSOR OTHER 0 40 01. STATUS: ISSUED CITY OF EDMONDS, 121 5TH A%TNUE NORTH - EDMONDSMA 98020 PHONE (425) 77 1-0220 - FAX: (425) 771-0221 e)r it Tiiii�ti6id-WW" /13/2-607; Jrr6jett Addres' 'S'... 2027 5TH AVE S, EOMONDS' Parcel No: 27032300407700 PROPERTYOWNER APPLICANT CONTRACTOR BP WEST COAST PRODUCTS LLC BARGAUSEN CONSULTING ENGINEERS ESE CORPORATION PO BOX 5015 18215 72ND AVE WEST I 10 1 1 WALLER RD BUENA PARK. CA 90622 KENT. WA 98032 TACOMA. WA 98446 42 5-25 1-622 253-535-3112 LICENSE #� ESECO**235QA EXP 10/4/2006 DEMO 1000SF CONVENIENCE STORE- 713SF CANOPY VALUATION: $0 PERMIT TYPE. Commercial STATUS: ISSUED CITY OF EDMONDS, 121 5TH A%TNUE NORTH - EDMONDSMA 98020 PHONE (425) 77 1-0220 - FAX: (425) 771-0221 e)r it Tiiii�ti6id-WW" /13/2-607; Jrr6jett Addres' 'S'... 2027 5TH AVE S, EOMONDS' Parcel No: 27032300407700 PROPERTYOWNER APPLICANT CONTRACTOR BP WEST COAST PRODUCTS LLC BARGAUSEN CONSULTING ENGINEERS ESE CORPORATION PO BOX 5015 18215 72ND AVE WEST I 10 1 1 WALLER RD BUENA PARK. CA 90622 KENT. WA 98032 TACOMA. WA 98446 42 5-25 1-622 253-535-3112 LICENSE #� ESECO**235QA EXP 10/4/2006 DEMO 1000SF CONVENIENCE STORE- 713SF CANOPY VALUATION: $0 PERMIT TYPE. Commercial PERMIT CROUP 23 - Demolition GRADING. N CYDS. 0 TYPE OF CONsT RUCT ION DEMO RETAINING WALL ROCKERY N OCCUPANT GROUP OCCUPANT LOAD FENCE� N 1 0 X 0 FT.) CODE. 2003 OTHER: N ------- OTHER DESC: ZONE. NUMBER OF STORIES: 0 . VESTED DATE INUMBER OF DWELLING UNIT& I I EXISW�G AREA 1BASEMENT. 0 Mr FLOOR 0 2ND FLOOR 0 PRO PO S ED AREA 1 BASEMENT: 0 IST FLOOR 0 2ND FLOOR: 0 13RD FLOOR 0 GARAGE. 0 DECK: 0 OT HER- 0 13 RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER- 0 FRONT S ETBACK SWESETBACK REAR SETBACK ,EQUIRED: PROPOSED. REQUIRED� PROPOSED: IRT-QUIRED. PROPOSEI)i 1EIGHT ALLOWED-0 PROPOSED:O IREQUIRED. PROPOSED ,ET BACK NOTES I AGREE TO CONIPLYWITH ciTYAND STATE LAWS REGULATING CONSTRUCTION AND IN DOINGTHE WORK AUTHORIZED THEREBY., NO PERSON "'ILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATINGTO WORKMEN'S COMPENSAT ION INSURANCE AND RCW 18-27 THISAPPLICATION ISNOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR I-IIS/HER DEPUTY AND ALI-FEESARF PAID ; 0�, " �V� �, L - — , , &,, � '/'-, /, �,�2, ". " � 7 - ,, - " � &,W& '711,4101, Signature Print Narne Date Released By Date ATTENTION IT IS UN LA �% FLIL TO USE OR OICCUPYA BUIL DING OR STRUCTU RE UNTIL A FINAL INSPE(-nON HAS BEEN MADE AND APPROVAL ORA CERTIFICATE Of OCCUPANCN'HAS BEEN GRANTED UBC109 IBC1 101 IRCI 10 F-1ARC1111VE = APPLICANT F--] ASSESSOR x 01-1-IFR 41) C. I g9� 0 City of Edmonds PERMIT NO: 983 ' 5 PERMIT EXPIRES SIDE SEWER PERMIT LID # Address of Construction: Property Tax Account Parcel No. /,'7032 30C)eVoy700 Attach copies of all access and utility easements Verified and Approved by v 'd Owner and/or Contractor: Contractor License czc", E� _4� n I Building Permit 4 L No El Single Family Invasion into City *Right -of Way: jg..Yes F M Multi -Family (No. of Units *RW Construction Permit #.AL;k)Lf Commercial (No. of Units D Public Cross other "Private Property: El Yes tallo "Attach legal description and copy of recorded easement. Ownspler contractor signature and acknowledgement statement: By signing for this permit I certify that I have read the City's public handout entitled Side Sewer Specifications, and shall comply with all City requirements outlined therein. Date 2 CALL DIAL -A -DIG (1-800-42�1'_5555) BEFORE ANY EXCAVATION W W FOR INSPECTION CALL 425-771-0220 extension ia&—w 24 HOUR NOTICE REOUIRED FOR ALL INSPECTION REOUESTS Permit Fee $ -- -Repair Fee Issued By: Trunk Charge $ M114 4-Li City Permit Surcharge Fee Date Issued: Receipt No: Total Fees Paid $ NOTE: IF JOB SITE IS NOT READY FOR INSPECTION WHEN INSPECTOR ARRIVES A $45 RE -INSPECTION FEE WILL BE CHARGED. Job Site Ready YES NO —Date: Initial: Partial Inspection: Date: Initial: Partial Inspection: Date: Initial: FINAL INSPECTION APPROVED: Date: Initial:,-Z-/-/ As -built to Street File: 1,� PERMIT MUST BE POSTED ON JOB SITE t- White Copy: File Green Copy: Inspector Buff Copy: Applicant L;temp;bldg;forms;ssperTnitjlg4/00 do 0 1 111'1= CAP vAicb-T SVAAAep- FK WORM?-'Ul uktrp .VJVT% Tw%&-T:ptA&% - A� T-d' a e- 01pir" mr lot 4� .... ... --- f =60 in a PA� so" me um A P= =am-= am= No= vmsw� 5TH AVENUE SOUTI+ z 0 --.>- Z APPROVED AS NOTED By ENGINEERING Date: 4 INS-TkU— _4CF, 6gt:.� ftowl= of Am- DAYTON ST. 202 DON C.O. 7XIE71N(;7T07E ;BAN Cn 4)' > < -C 4__j C.O. In 15 1 0 C. . C.O. 6" ED* CITY OF EDMONDS SIDE SEWER AS- BUILT 0 11 -Wool ADDRESS HOMEOWNER 202 — 5th Avenue South Thuesen CONTRACTOR SCALE Evergreen Environmental Service NTS DATE DRAWN PERMIT 1890 4-8-2004 IBY K. Haney NO. 9835 �UT FILE 0 Critical Areas Checklist' Site Information ARCO AM/PM Project Name- - MINI -MARKET Site Location: 202 SO. 5TH AVE. Permit Number Property Tax Account Number. 232703-4077 Approximate Site Size (acres or square feet): Have you filled out a Critical Areas Checklist for a project on this site before? General Site Conditions NO 1. Has the site bem cleared or logged? NO Date of most recent action: — Soils / Topography 2, in the Suohomish County Soil Survey, what is the mapped soil typo(s)? 3. Describe the general site topography. Chock all that apply. X Flat less than 5 feet elevation chang� over entire site. Rolling: slopes on site generally less than 15% (a vertical rise of 10 feet over a horizontal distance of 66 feet.) 11illy: slopes present onsite of more than 15% and less than 300/* ( a vertical rise of 10 fbet.of horizontal distance.) Steep: grades of greAW than 30% present on site. Comments Hydrology/Vegetation. - 4. Site contains areas of year-round standing water. NO 5. Site contains areas of seasonal standing waten NO —Approx. Depth: 6. Site is in the floodway NO floodplain _NOof a water course. 7. Site contains a creek or an area where water flows across the grounds surface? flows are year-round? NO Flows are seasonal? NO 8. Site is primarily: forested meadow shrubs _; mixed DEVELOPED 9. Obvious wetland is present on site: NO 10. Wetland inventory or map indicates wetland present on site: NO 11. Critical Areas inventory or map indicates any Critical Area on site: NO 0 6 C It U 0-1991 PERMIT COUNTER CitY of Edmonds Critical Areas Checklist T1110 Critical Areas Checklist contained on dis fOm is to be filled -out by any Person Preparing a Development 1?crmit Application for the City of Edmonds prior to his/her submittal of a development permit to the city. 111C Purpose of the Checklist is to enable City staff to determine ''whether any potential Critical Areas am or may be present on the subject Pr0PcrtY- Thc information needed to comPlft the Chccidist should be easily available fiom observations of the site or data available at City Hall (Critical Areas inventories, maps, or soil surveys). An Vplicant� or his/her representative, must f '11 out the choe'dLS', sign and date, it, and submit it to the City- The City will reic,,, the chccldist, make a precursory site visit, and makc a determination of the mbscquent Steps necessary to complete a development Permit application. With a signed copy of this form� the applicant Should also submit a vicinity map of the parcel with enough detail am City staff can find and identify the subject Parcel(s). In addition, the applicant is encouraged to include any other pertinent information or studies in conjunction with this Checklist to assist staff in completing their Preliminary assessment of the site. � have completed the attached Critical Area Checklist and attest that the answers provided -are factual, to the best of my knowledge (fill out the appropriate column below). Owner / Applicant: ATLANTIC RICHFIELD COMpANy DALE FRATES Name Tide 18215 72ND AVENUE SOTUH Street Address KFNL WA 9,9n'19 f2O6) 251-6222 City, State, Zip Phone Applicant Representative: BARGHAUSEN CONSULTING ENGINEERSS INC. FRED WILHELM Name PROJECT PLANNER Title 18215 72ND AVENUE SOUTH Street Address KENT, WA 98032 City. State, Zip (206) 251--6222 Phone Date Signature Date e, c 4'. f ECIxii0n,1131S e ical ..--'Areas C The Critical Arm. ChecIffist contained on this form is tolm filled out biyl. -my- Wtuson prepu . . n si ID0401opmOt Petwt Application -for the City. of Edmbnds to his/her submittal of ad'evel'opment, t to.the city. .7ho purpose of. the Checidist is -to emble, er 211Y, Potential th'dcqi:Ar-e-�� -am or: is may be th i6ededl­ "t th, 0 :Ch��*t.shouldbi-.�' fle..ftom ns* 4 the ��-Qr,dati R�awle, at Y -W (Critical Ai�is lhvlp� ma j An applicant, or his/her representative, muit fill -out the checkfist, sign and date i4 FILE T bec''Ust and submit it to die City. The city will review the chedgg, maim a pmmftory site AA and malm a determination of the submqueat step nec Mary Complete a dCVC10Pmeftt Permit 4plication. With a sigmed MPY of this form, the applicant should "-submit a' Wcinity map Or -Plot plan fbr hdividual lots I of the parcel wil dW City staff can find and idenfif� ote.-sub' i - - P=d(s)'. In 4dMon,th Akiiit-00- _W�de U "to asft staff in completMg the1r'.Prdbd=ry assessment of the 91te. I have completed the attached Critical Area Checklist and aft= that the -answers provided are .&Ctual' to the best of my Imowlefte (fU- out the apprOpriate column below). Owner / Applicant. - ATLANTIC RICHFIELD COMPANY DALE-FRATES, REAL ESTATE -ENGINEER Nam C/O BARGRAUSEN CONSULTING ENGINEERS 18215 72ND AVENUE SOUTH SUW Addr(= KENT, WA 98032 251-6222 city, stite, zip Phone Applicad Reprwentafive: BARGHAUSEN CONSULTING ENGINEERS JOHN ELLINGSEN, PROJECT PLANNER Time 18215 72ND AVENUE SOUTH Skut AAdress KENT,_WA 98032 .. 251-6222 U Ve 4: 18025 September 15, 2006 Mr. Joe Runte The Bank of Washington 19424 58th Place West Lynwood, Washington 98036 Project No. E-12643 Dear Mr. Runte: Bureau Veritas North America, Inc. Geotecbnxal Semxes Department We are pleased to submit our report titled "Geotechnical Engineering Study, The Bank of Washington, 202 Fifth Avenue South, Edmonds, Washington." This report presents the results of our engineering analyses based on review of subsurface information collected by Delta Environmental Consultants, Inc. on July 7, 2004. The purpose and scope of our study were outlined in our proposal PRA 2643, dated September 7, 2006. We appreciate this opportunity to have been of continued service to you. If you have any questions, or if we can be of further assistance, please call. Respectfully submitted, BUREAU VERITAS NORTH AMERICA, INC. Eric L. Woods Senior Staff Geologist ELW/KMW/skp Earth Consultants, Inc. A Bureau Veritas Company 1805 136th Place, N.E., Suite 201 Bellevue, WA 98005 Kristina M. Weller, PE Associate Principal Main: (425) 643.3780 Fax: (425) 746.0860 RECEIVED SEP 1 5 2006 BUILDING DEPT. GEOTECHNICAL ENGINEERING STUDY THE BANK OF WASHINGTON 202 FIFTH AVENUE SOUTH EDMONDS, WASHINGTON September 15, 2006 Project No. E-12643 Mr. Joe Runte The Bank of Washington 19424 58th Place West Lynnwood, Washington 98036 BUREAU VERITAS North America, Inc. 1805 136th Place N.E. Suite 201 Bellevue, WA 98005 (425) 643-3780 Toll Free (888) 739-6670 TABLE OF CONTENTS E-12643 PAGE INTRODUCTION......................................................................................................................... 1 General................................................................................................................................... I ProjectDescription ............................................................................................................... I Scopeof Services ................................................................................................................. 2 SITE CONDITIONS ..................................................................................................................... 2 Surface................................................................................................................................... 2 Subsurface............................................................................................................................. 2 Groundwater.......................................................................................................................... 3 DISCUSSION AND RECOMMENDATIONS .............................................................................. 3 General................................................................................................................................... 3 Site Preparation and General Earthwork ............................................................................ 3 Erosion Control and Stripping .......................................................................................... 4 TemporarySlopes ............................................................................................................ 4 StructuralFill ..................................................................................................................... 4 Foundations........................................................................................................................... 5 Slab -on -Grade Floors ........................................................................................................... 5 RetainingWalls ..................................................................................................................... 6 Seismic Design Considerations .......................................................................................... 6 GroundRupture ................................................................................................................ 6 Liquefaction...................................................................................................................... 7 GroundMotion Response ................................................................................................ 7 SiteDrainage ......................................................................................................................... 7 PavementAreas .................................................................................................................... 7 LIMITATIONS........ : ..................................................................................................................... 8 AdditionalServices ............................................................................................................... 8 TABLE OF CONTENTS, Continued E-12643 ILLUSTRATIONS Plate 1 Vicinity Map Plate 2 Monitoring Well Location Plan Plate 3 Typical Footing Subdrain Detail APPENDICES Appendix A Field Exploration Plates Al through A4 Well/Boring Logs GEOTECHNICAL ENGINEERING STUDY THE BANK OF WASHINGTON 202 5TH AVENUE SOUTH EDMONDS, WASHINGTON E-12643 INTRODUCTION General This report presents the results of the geotechnical engineering study completed by Bureau Veritas North America, Inc. (BVNA) for the proposed bank development to be located at 202 Fifth Avenue South in Edmonds, Washington. The general location of the site is shown on the 'Vicinity Map," Plate 1. The purpose of this study was to review subsurface information collected by Delta Environmental Consultants, Inc. on July 7, 2004, and, based on the conditions encountered, to provide recommendations for developing the site with a new bank and associated drive and parking areas. Project Description The subject site consists of an approximately 0.257-acre, irregular -shaped site located at 202 Fifth Avenue South in Edmonds, Washington. The subject site is bordered to the north by Dayton Street, to the east by Fifth Avenue South, to the south by a commercial development, and. to the west by an alley and an apartment building. BVNA understands it is proposed to develop the site with a new one-st.ory bank with a drive- thru lane and associated paved parking and drive areas. We understand the bank will be of relatively lightly loaded wood frame construction with brick veneer. We anticipate wall loads will be on the order of 6 to 8 kips per lineal foot and column loads on the order of 40 to 70 kips. We estimate slab -on -grade floor loads will be up to 250 pounds. per square foot (psf). The site is currently vacant. At the time our study was performed, the property, proposed buildings, and the exploratory locations were approximately as shown on the "Monitoring Well Location Plan," Plate 2. The conclusions and recommendations in this study are based on our understanding of the proposed development, which is in turn based on the project information provided us. If the above project description is incorrect or the* project information changes, we should be consulted to review the recommendations contained in this study and make modifications, if needed. BUREAU VERITAS Page 1 North America, Inc. Geotechnical Engineering Study September 15, 2006 Scope of Services 12643 We prepared this study in general accordance with the scope of services outlined in our September 7, 2006, proposal. On this basis, our study addresses the following: • Evaluation of general subsurface conditions and description of types, distribution, and engineering characteristics of subsurface materials • Evaluation of general groundwater conditions and potential impact on design and construction • General recommendations for earthwork, including site preparation, excavation, site drainage, and the placement of structural fill • Determination of the seismic design parameters • Evaluation of project feasibility and suitability of on -site soils for foundation and fill support • Recommendations for suitable foundation systems and provision of allowable soil bearing capacities, associated settlement estimates, and lateral pressures and resistances under various loading conditions • Recommendations for subgrade preparation for floor slab and slab -on -grade support • Recommendations for utility trench excavation and backfill • Recommendations for temporary and permanent slopes SITE CONDITIONS Surface The subject site consists of an approximately 0.257-acre, irregular -shaped, asphalt -paved lot located at 202 Fifth Avenue South in Edmonds, as shown on Plate 1. The site is relatively level with a slight slope to the southwest. The maximum elevation change across the site is approximately 4 feet over a horizontal distance of 180 feet. Subsurface Subsurface conditions at the site were evaluated -by reviewing four boring logs by Delta Environmental Consultants, Inc. which were drilled at the approximate locations shown on Plate 2. The borings were drilled to a maximum depth of 21.5 feet below existing grade. The well/boring logs are included as Plates Al through A4. Please refer to the well/boring logs for a detailed description of the subsurface conditions encountered at each boring location. The following is a generalized description of the subsurface conditions encountered. At each of the boring locations, an approximately 6-inch-thick layer of asphalt was encountered at the surface. The asphalt was underlain by fill comprised of silty sand (Unified Soil Classification SM) to depths of 2.5 to 10 feet below existing grade. The fill was generally medium dense and was characterized by trace amounts of concrete, glass, wire, rebar, and wood debris. BUREAU VERITAS Page 2 North America, Inc. Geotechnical Engineering Study 12643 September 15, 2006 Underlying the fill, native soils comprised of silty sand (SM) and silt (ML) with localized areas of silt with sand (ML) and clay (CL) were encountered to the maximum depth explored. The native soils were generally very dense. Groundwater A groundwater table was encountered at each boring location at depths of 6.5 to 8.5 feet below existing grade. The contractor should be aware that groundwater levels are not static. There will likely be fluctuations in the groundwater level and seepage rate, depending on the season, amount of rainfall, surface water runoff, and other factors. Generally, the groundwater level is higher and seepage rates are greater in the wetter winter months (typically October through May). DISCUSSION AND RECOMMENDATIONS General Based on the results of our study, in our opinion, development of the site with a new bank is feasible from a geotechnical engineering standpoint. Conventional spread and continuous footing foundation systems bearing on a minimum 2 feet of compacted structural fill may be used for support of the proposed structure. Slab -on -grade floors may be similarly supported. This report has been prepared for specific application to this pmject only and in a manner consistent with that level of care and skill ordinarily exercised by other members of the profession currently practicing under similar conditions in this area. This report is for the exclusive use of The Bank of Washington and their representatives. No warranty, expressed or implied, is made. This report, in its entirety, should be included in the Oroject contract documents for the information of the contractor. Site Preparation and General Earthwork Based on our under'standing of the proposed development plan, site earthwork will likely consist of installing erosion control measures, stripping the site, cutting and filling the site to provide for building pad and parking grades and the installation of. underground utilities, preparing parking subgrades, and excavating for the building foundation. BUREAU VERITAS Page 3 North America, Inc. Geotechnical Engineering Study September 15, 2006 Erosion Control and Stripping 12643 The site should be stripped and cleared of asphalt, organic matter, and other deleterious material. Existing utility pipes to be abandoned should be plugged or removed so they do not provide a conduit for water and cause soil saturation and instability problems. During construction, the site must be graded such that surface water is collected and tightlined to an appropriate drainage facility. Water must not be allowed to stand in fill areas or where buildings, slabs, or pavements are to be constructed. Loose so il surfaces should be sealed by compacting the surface to reduce the potential for moisture infiltration. Temporary Slopes The following information is provided solely as a service to our client. Under no circumstances should this information be interpreted to mean that BVNA is assuming responsibility for construction site safety or the contractor's activities; such responsibility is not being implied and should not be inferred. In no case should excavation slopes be greater than the limits specified in local, state (WISHA), and federal (OSHA) safety regulations. Based on review of the information from the boring logs, the fill and native soils would be classified as Type C by wisHA/oSHA. Temporary cuts greater than 4 feet in height in Type C soils may be sloped to a maximum inclination of 1.5H:1V (Hodzontal:Vertical). If slopes of this inclination or flatter cannot be constructed, temporary shoring may be necessary. Structural Fill Structural* fill is defined as compacted fill placed under buildings, roadways, floor slabs, pavements, or other load -bearing areas. Structural fill should be placed in horizontal lifts not exceeding 12 inches in loose thickness a * nd compacted to a minimum of 95 percent of its laboratory maximum dry density determined in accordance with ASTM Test Designation D1557 (Modified Proctor). The fill materials should be placed at or near their optimum moisture content. Bated on review, the on -site soils in the upper 10 feet of the boring logs at the time of the exploration appear to be near optimum moisture levels and should be suitable for use as structural fill. The logs indicate the near surface fill and native soils have from 10 to greater than 50 percen t fines passing the U.S. No. 200 sieve. Soil with fines in excess of 5 percent will degrade if exposed to excessive moisture, and compaction and grading will be difficult if the soil moisture increases above its optimum condition. If the site soils are exposed to excessive moisture or cannot be adequately compacted, it may be necessary to import a soil that can be compacted. During dry weather, any non -organic, compactable soil with a maximum grain size of 4 inches can be used. Fill for use during wet weather should consist of a fairly well -graded, granular material having a maximum grain size of 4 inches and no more than 5 percent fines passing the U.S. No. 200 sieve based on the minus 3/4-inch fraction. BUREAU VERITAS Page 4 North America. Inc. Geotechnical Engineering Study 12643 September 15, 2006 Foundations Based on the results of our study and provided our recommendations are followed, in our opinion, the proposed buildings may be supported on conventional spread and continuous footing foundation systems bearing on a minimum 2 feet of compacted structural fill. Exterior foundation elements should be placed at a minimum depth of 18 inches below final exterior grade. Interior spread foundations should be placed at a minimum depth of 12 inches below the top of slab, except in unheated areas where interior foundation elements should be founded at a minimum depth of 18 inches. With foundation support obtained as described, for design, an allowable soil bearing capacity of 2000 psf should be used for structural fill. Loading of this magnitude would be provided with a theoretical factor -of -safety in excess of 3.0 against shear failure. For short-term dynamic loading conditions, a 1/3 increase in the above allowable bearing capacity may be used. Continuous and individual spread footings should have minimum widths of 18 and 24 inches, respectively. With structural loading as expected and provided the above design criteria are followed, total settlement of approximately I inch is anticipated, with differential settlement of approximately 0.5 inch. Most of the anticipated settlements should occur during construction as dead loads are applied. Horizontal loads can be resisted by friction between the base of the foundation and the supporting soil and by passive soil pressure acting on the face of the buried portion of the foundation. For frictional capacity, a coefficient of 0.35 should be used. For passive earth pressure, the available resistance should be computed using an equivalent fluid pressure of 350 pounds per cubic foot (pcf) for foundations backfilled with structural fill. These lateral resistance values are allowable values, and a factor -of -safety of 1.5 has been included. As movement of the foundation element is required to mobilize full passive resistance, the passive resistance should be neglected If such movement is not acceptable. Footing excavations should be observed by a representative of BVNA prior to placing forms or rebar to verify that conditions are as anticipated in this report. Slab -on -Grade Floors Slab -on -grade floors should be supported on at least 1 foot of granular structural fill. Loose native soils or structural fill disturbed during grading must either be recompacted or overexcavated and replaced with structural fill. The slab -on -grade floor should be provided with a capillary break consisting of a minimum of 4 inches of free -draining sand or gravel. In areas where slab moisture is undesirable, a vapor barrier, such as a 6-mil plastic membrane, should be placed beneath the slab. BUREAU VERITAS Page 5 North America, Inc. Geotechnical Engineering Study September 15, 2006 Liquefaction 12643 Liquefaction is a phenomenon in which soils lose all shear strength for short periods of time during an earthquake. Groundshaking of sufficient duration results in the loss of grain -to -grain contact and rapid increase in pore water pressure, causing the soil to behave as a fluid. To have a potential for liquefaction, a soil must be cohesionless with a grain -size distribution of a specified range (generally sand and silt), it must be loose, it must be below the groundwater table, and it must be subject to sufficient magnitude and duration of groundshaking. The effects of liquefaction may be large total and/or dfferential settlement for structures founded in the liquefying soils. In our opinion, the potential for liquefaction of the soils encountered at this site should be low. This conclusion is based on the very dense condition of the native soils. Ground Motion Response The 2003 Intemational Building Code (IBC) regulations contain a static force procedure and a dynamic force procedure for design -base shear calculations. Based on the encountered soil conditions, it is our opinion Site Class C, "Very Dense Soil or Soft Rock," as defined in Table 1615.1.1 of the IBC, should be used to characterize the site soils. Site Drainage A groundwater table was encountered at each boring location at depths of 6.5 to 8.5 feet below existing grade. If seepage is encountered, the bottom of the excavation should be sloped to one or more shallow sump pits. The collected water can then be pumped from these pits to a positive and permanent discharge, such as a nearby storm drain. Depending on the magnitude of such seepage, it may also be necessary to connect the sump pits by a system of connector trenches. Final site grades must allow for drainage away from the structure foundation. The ground should be sloped at a gradient of 3 percent for a distance of at least 10 feet away from the structure. Footing drains should be installed around the perimeter of the structure, at or just below the invert of the footing, with a gradient sufficient to initiate flow, as shown on the 'Typical Footing Subdrain Detail," Plate 3. Under no circumstances should roof downspout drain lines be connected to the footing drain system. Roof downspouts must be separately tightlined to discharge. Cleanouts; 'should be installed at strategic locations to allow for periodic maintenance of the footing drain and downspout fightline systems. Pavement Areas The adequacy of site pavements is related in part to the condition of the underlying subgrade. To provide a properly prepared subgrade for pavements, the subgrade should be treated and prepared as described in the "Site Preparationn section of this report. This means the subgrade should be compacted.to 95 percent of the maximum dry density (per ASTM D1 557). BUREAU VERITAS Page 7 North America, Inc. Geotechnical Engineering Study 12643 September 15, 2006 The subgrade should be proofrolled with a loaded dump truck under the observation of a BVNA representative prior to the placement of the crushed rock base. Soft, wet, or unstable subgrade should be removed and replaced with granular structural fill or crushed rock. Either of the following pavement sections for lightly loaded areas is suggested for site roadways: 2 inches of asphalt concrete (AC) over 4 inches of crushed rock base (CR13) material 2 inches of AC over 3 inches of asphalt treated base (AT13) material We will be pleased to assist in developing appropriate pavement sections for heavy traffic zones, if needed. The pavement section provided above may be superceded by City of Edmonds requirements for minimum pavement sections. Pavement materials should conform to WSDOT specifications. LIMITATIONS Our recommendations and conclusions are based on review of the boring logs and engineering analyses, the design information provided us, and our experience and engineering judgment. The conclusions and recommendations are professional opinions derived in a manner consistent with that level of care and skill ordinarily exercised by other members of the profession currently practicing under similar conditions in this area. No warranty is expressed or implied. The recommendations submitted in this report are based on review of the data obtained from the borings. Soil and groundwater conditions between borings may vary from those encountered. The nature and extent of variations between the exploratory locations may not become evident until construction. If variations do appear, BVNA should be requested to reevaluate the recommendations of this report and to modify or verify them in writing prior to proceeding with the construction. Additional Services As the geotechnical engineer of record, BVNA should be retained to perform a general review of the final design and specifications to verify that the earthwork and foundation recommendations have been properly interpreted and implemented in the design and in the construcfion specifications. BVNA should also be retained to provide geotechnical services during construction. This is to observe compliance with the design concepts, specifications, or recommendations and to allow design changes in the event subsurface conditions differ from those anticipated prior to the start of construction. BUREAU VERITAS Page 8 North America, Inc. f NUTT 181TH Sl Sw wm I i8al I t v sw if q� d MPE PI WhIER 'T v ;I sw 1001 Sw s�.'N f NEW ST 13 CIL M —.0-% 196 M ST SW -f %w DR PIZi I PUGET MELODY LN WY Q, MELODY L" .41b, coo, WY LKANO i�' i N axomla. �'f -V . 'I 9w (INVE P/A I ER CkSPERS ST t, W"'P4. a, PARk i WON 51 SW WAX - !A PS 0-I LAVI 4y i; P1 GLIN ST REACH `4 DALEY ST 43 I Vic e, CYR: SPRAGUL ST 1 1 �?'.,tv , a), . . A,'t' < 206 rh 116 Mao PINE - Hli t ST is- E91 IN: 37 Pt 56':. . . lb X A.Y'10N .109111 P1 va FILE LP JT PAM., I 23 QNut T S" �6'- � 4 - .1. CLDAR '9 ST WILDWE - t.. RO HOWEL 1. WY %1 :91 OB !P" try. : - 2BIN iwt .r 414 LQJKA 01 S, j -4 P J�e I., , ST-7-- vim 46 2171H 51 �i 1 '14 LN I IT _41 ;w A� it, f R ST 88EN, 26 30 < 25 Cv)i �E ;ELIA (M A Itt , — te ELM ST ii, ELI 4 ST 2 Q�ST Sw RD ;& "I -W VA. _-c "P sw BUREAU VERITAS NORTH AMERICA, INC. VICINITY MAP Reference: THE BANK OF WASHINGTON Snohomish County EDMONDS, WASHINGTON Map 454 A By Thomas Brothers Maps NORTH DRWN.DNM PROJ. NO. 12643 Dated 2006 I CHKD. ELW DATE 9/12/06 PLATE 1 DAYrON STREET DC .......... A ANMA V =11 V f .. '--1 ma.. 4 01 ---------- AIA E T Qp 0 ELEV loo'o -C. 58-00"PEED 1 -0 M -41 V.- K MI N-31 —<D AN �4 REFERENCE: DIMENSIONS ARCHITECTURE AND PLANNING, INC., 9/1/06 LLEGEND MW-1 I Appro)dmate location of monitoring well BUREAU VERITAS NORTH AMERICA, INC. by Delta Environmental Consultants, Inc., July 7, 2004 MONITORING WELL LOCATION PLAN THE BANK OF WASHINGTON EDMONDS, WASHINGTON DRWN.DNM PROJ. NO. 12643 NORTH NOT TO SCALE CHKD.ELW DATE 9/12/06 PLATE 2 t' SLOPE TO DRAIN 4 INCH MIN. DIAMETER PERFORATED PIPE — z 2 INCH MIN. 2 INCH MIN. 4 INCH MAX. 12 INCH MIN. LEGEND Su ce seal; native soil or other low peffnea bility material Washed rock or pea gravel Drain pipe; perforated or slotted rigid Schedule 40 PVC or SDR 35 pipe laid with perforations or slots facing down; fight jointed; with a positive gradient. Do not use flexible corrugated plastic pipe. Do not tie building downspout drains Into footing lines. SCHEMATIC ONLY - NOT TO SCALE NOT A CONSTRUCTION DRAWING BUREAU VERITAS NORTH AMERICA, INC. TYPICAL FOOTING SUBDRAIN DETAIL THE BANK OF WASHINGTON EDMONDS, WASHINGTON DRWN.DNM PROJ. NO. 12643 CHKD. ELW I DATE 9/12/06 PLATE 3 APPENDIX A FIELD EXPLORATION E-12643 The field exploration was performed on July 7, 2004. Subsurface conditions at the site were explored by drilling four borings to a maximum depth of 21.5 feet below existing grade. The borings were drilled by Cascade Drilling, Inc. The boring locations and elevations were surveyed on July 12, 2004. These approximate locations are shown on Plate 2. Logs of the borings are presented on Plates Al through A4. The stratification lines on the logs represent the approximate boundaries between soil types. In actuality, the transitions may be more gradual. Delta Environmental Consultants,. Inc. IWELLIBORING:MW-1 9 Cffy:. Edmonds [STATE. WA DRILLER: Caswde WELUBGRING g COMPLETION Sz X DRY I I I I MST 3 9 6 5 6 6 6 7 8 9. WET 3 8 23/8 10. 5016 12. 14 WET 3 7 3016 Is Sw 16 17 50/6 19 20 21 WELL CASING. SCH 40 PVC 2" WELL SCREEN: 4-lW(0.010") dIffnj 1, Inm SAN PACKU 3-19' (2X "2 0 MING ELEVATION 1 7 :C SURVEY DATE- 7112M 01W. 18.01 DESCPJPTIONILOGGF-D BY: Corvidea Katsaros Asphalt SM FILL. SILTY SAND : [an; 10% sill; 80% line sand, 5% medium send, 5% coarie sand,. trace gravel and places of concrete. Sm W SAME AS ABOVE, CL rdCLAY: dark gray', 76% cla)r. 25% very fine sand, sartd; occurs In lenses, medium plasticIty; very stiff. Sm SILTY SAND - grar, 10% slit: 90% medium sand-, trace coarse sand and gravel. MLJKAAND� gray; 100A slit 90% fina sand; very dense, Sm B ' with trace coarse sand and gravel In a 11 lenw SM Heaving sand, no sample PLATE A-1 Delta Environmental Consultants, Inc. I WELLOSORING: MW-2 ATE: WA MW2 -ST -------- DRILLER: C WELL/BORING COMPLEmON Z5 9 Sz T 2 1 0, 1 kqV k DRY 1 3.7 1 1 1 WELL CASING: SCH 40 PVC 2* WELLSCREEN: 4-11?(0.0101 1111n Inc. SAN PACK: 3-19IM12) .j 0 CASING ELEVA71ON 100.26 0 t SURVEY DAM 07W. 7112JO4 16.33 DESCRIPTIONILOGGED 13Y.- Corvidoa I(stgaros .9m ... FILL SILTY SANQ; gn))r, `10% SIR; 66% One send, 5% medium sand: trace coarse sand end gravel. NO s8mPI0 collected, construction debris.. INET 1 218 1 50 '1 10 A ' = 9MY; 100% sill With lenses of fine sand; trace gravel; I I very dense. 13- 14 WET 2.7 so 15— SM fiMLSMAM graY' , 10% sit 30-60% One sand; 40-60% 16 medlurn sand; trace gravel. i" tense of gray silk very dense.. 17 WET 21 60 SM SILTY SAND: grajr, lo% sat; qo% fine sand, grade 16 downward to 30% silt 70% very One sand: very dense. 19 21 PLATE A-2 &41 WqLkffl_0B[N_G LOCATION P Deita . Environmental Consultants, Inc. FWEUJB0R1ft MW-3 !NsTALLA-noN DATE: 717ID4 DRILLING METHOD: Hollow Stem Atmer r PROJFZr* AM02-517 SAMPLING MEMOD, QM Spit Spoon Cum: Adantic Pictiffeld Company 822 BORING MAMETEW. On LOCOON. 202 Fft Avenue South BORING DEPTH: 111Y MY. Edmonds WELL CASING: SCH 40 PVC 2" -A: _E: TT i WA WELL SCREEN: 4-1 W L0.01 MW-3 DR] -Cascade Drffhn Inc. EIAND PACK: 3-1W (919) VVELU13ORING 5 to 'd CASINGELEVATION 98.47 SURVEY DATE, 16-30 COMPLETION H 7/j2to4 DTW. as (0 DESCRIPTIONfLOGGED BY., CorvWea Katsaros Asphalt MST 283 Sm FILL SILTY SAND, gray, 10% slit 90% One'sand, trace gravel, coarse sand and cobbles'. debris wire, glass, 2X4, places of concrete. .WV 6— MST 585 7 10 ML MM gray. 1100%-silt. trace fine sand; brown organics and a 20 — 6- cobble. very dense. SZ 7— SAME AS ASQW_, slit with Increasing brown organics. WET 679 20 10— — ML 50/6 SM 11— SILTY SAND: gray, 10% slit; 90% very 6ne sand; very dense. 12- 14 V 6016 SM SILTY SAND., gray. 10-201/6 silt 80-90% very fine sand, 1113- Interbadded with layers or 11001A SOL WET 107 17— ML N DRY 117 50/8 18- — BU grajr. 100% slit; trace fine sand, very dense. 19 20- 21 222 1 1 1 PLATE A-3 WELL/121 N LOCATION --------- Delta Environmental consuitants, AORING: MW-41 INHALLATION DAM 717im DRILLING M0H0D:.Hg11w ftm Auger ^A MPLING wifflm- D&I SR in Swon CLIENT., Atlantic Richfield Company 822 BORING DIAMETER: 8" LOCATIQN:,202 Fifth Amenue South BORING'DEPTH: 2(Y MW-4 CITY: Edmonds WELL CASING: SCH 40 PVC Z' STATE: WA WELL SCREEN: 6-2T (0.01 DRILLER. Ca de'DAIIIng, Ina SAN - PACK 4�W RX12) () CASING ELEVA11ON 99,30 WELUBORING COMPLETION SURVEY DAM' 71112104 L D7W. ir &61 Sz T E DIBSCRIPTIONALOGGID BY. CorvIdea Katuarcs Asphalt 250 SM FILL, SILTY SAND, gra)q, 10% silt 90% fine sand; trace coarse sand and gm'vel; debris. rather, wood. and mots, 3- 4— -let. M DRY 501 7 5 SM SAME AS ABOVE, rill; silly sand, medium dense.. 7 K Ff g x.$ H. MST 395 60/6 10—: SM SILU BAND -gray. 10% slit 00% very fine sand, Interbedded with V ML ALIMMILAAM' gray. 70-801/b silt: 20-30% very fine sand; 12- verydense. 141- WET 14 6016 Bond SM SILTY SAND, gmy;. 1D-2D% silt OD-90% very fine sand. very dense. H. 17— .V R Ij WET 3 50f6 20— SM BAREASABUM with Increasing fines. 21- 22— PLATE A-4 - PLANNING DATA -- Signs -- STREET=FILE Sign Colors Proposed: w �T�e-- ql6lmoum Acceptable? Requires ADB Approval? AO Sign Location' If freestanding and 3-feet or over (unless a fence) meets setbacks? Requireol Setbacks Street: Side: Side: Rear: Alctual.5etbacks -T Street: Picle: Side: Rear: Landscaping for FreestandIng SIgns Size: Location: Critical Areas Determination #: StudyRequired waiver Other - e —2 V/ Plan Review By:-� vavlar loujf�n PLANNING DATA -- signs -- I HID N ame: IsSlite Date: Address: -�7-0 2- - E��JA Plan Check #: BLD-200 Project Description: VVAII Reduced Site Plan Provided: (YES Zoning: Comprehensive Plan Designation: Map Page: ;,70,2— —.. Corner LLot: NO) I (�5/ _ Flag Lot: (YES CN 0 ADB File # (or date waived): IV;Q- TOTAL Area T ign ype of S Type of Sign Allowed in zone? Matrix conditions . Allowed area per Unit TOTAL sign area Proposed met? unit allowed for sign area this siQn ExaMple Wall wl,�Mernal Illumination Yes, with condlt=5 Yes sq. tt-111neal It. attached 4.1 ft. attached wall 41 sQuare feet 20 square fee:: wall Sign #1 VVAII ts W11"4 3'�.�6 --L�o ye5 ir C� T-1 Sign Sign 4 14 /,-IL 0/y// 111UC1 IU[ Jt![1dfJt1,.,1J-e itt lax Permitt Previous Total: Proposed -7, 777"', t Sign Type: Max Permitted: Actual Height: Sign Type: Max Permitted: Actual Height: Sign Type: Max Permifted-. Actual Beight-. December 2000 i0o. -iy e, e,+ .00i S Figure 6H-11,9. Lane Closure on Minor Street (TA-18) CD(\CS Typical Application IS Page 6H-41 I: See Tables 6H-2 and OW3 for the rneanlng of the s9fnbols and/or loner codes used in this fkgure.. le (6pflonaq fted Adenuelor (o p1lonal) Buffer Space (opUonnl) ft)max.- SCCt. 6KO I If 211M no A as T do 76 La ejo za" . '4 e-� 70 �M=p um S. mm VANMC � In ? 4 - PARKM ME C A OPM AWKI PRIM m Acm� SPACE mm me � vla I M MW A Mrs I EVE X� c goo= win 5TH AVENUE SOUTI+ aw &Aft#MWMkMMft nun C:IN r No slam Comm umx APPROVED AS NOTED BY ENGINEERING cr Date: (A z ltjs.-TN.L-L- ?ZF- STA-00ftTIZIS -<c� sm-r' sa4x'rg� *mw�--r . 121 5TH AVENUE NORTH - EDMONDSWA 98020 PHONE: (425) 771-0220 - FAX: (425) 771-0221 STATUS: APPROVED Pennit Number: ENG20070191 Address of Pubfic Use/Encroachment: 202 5TH AVE S, EDMONDS PROPI-XINOWNER BUSINESS OWN1,11 I S'I'IZEEI'USI-YEN;CIIOACIIN'll�N;'I' ENCROACUMENT OF ROOF OVERHANGS, CANOPIES, AND FOOTINGS. ENG20070191 STREET USE: Placement o any temporary or movable objects in any portion ofpublic space or City right-of-way shall meet all code requirements as setforth in thefollowing chapters of the Edmonds Community Development Code. ENCROACHMENT. Permanent structures encroaching upon any portion ofpublic space, City right-of-way or easement area shall meet all Code Requirements as setforth in thefollowing chapter of the Edmonds Community Development Code. CODE APPLICATION. Chapter 18.70,17.65, and 17.70.040 of the Edmonds Community Development Code. All terms of the adopted ordinance are incorporated herein as if setforth in full and this permit therefore is subject to the terms of those chapters. FOR THE TERMIN WHICH THIS PUBLIC USEIENCROACHMENTIS INEFFECT, THE OWNER SHALL COMPLY WITH THE PERMIT COADITIONS SET FOR TH B Y THIS PERMIT. NOTE: The issuance of this permit is understood by the owner to be of a temporary nature, shall vest no permanent right and shall be issued and may in any case be revoked at the sole discretion of the City per ECDC 18.70.040. Applicant is responsible toprovide a copy of the insurance certificate to the City at the beginning of each calendar year, no later than the 21st day of January. INDEMNITY: The Applicant understands and agrees to hold the City of Edmonds harmlessfrom any injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the applicant or the City of Edmonds, or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs, court cost, and attorneyfees by reason of granting this permit. In addition, the applicant understands that helshe shallprovide and continually maintain during the term of the permit a ceritificate of insurance naming the city as an additional insured, with respect to liability, andproviding that it shall be primary as to any other policy of insurance. THISAPPLICATION ISNOTA PERMITUNnL SIGNED BY THE CITY ENGINEER OR HISMER DEPUTY: AND FEES ARE PAID, AND RECEIPT IS ACKNOWLEDGED IN SPACE PROVIDED. Printed: Friday. December TE V V FILECOPY F-1 INS PECTOR COPY E] APPLICANT COPY STATUS: APPROVED ENG20070191 CONDITIONS 0 None 0 None When recorded mail to: City Clerk City of Edmonds 121 Fifth Avenue North Edmonds, WA 98020 CONFORMED Copy 200708221063 1 7 PGS 0812212007 4-27�m 1�46,00 SNOHOMISH COONT , ASHINGTON SPACE ABOVE THE LM FOR RECORDERS USE Assessor's Parcel No.: 2103250040-7-74b Applicant: C-%A-<z-i �5c-44mffr4tp,�K� WA51+IK( ;g-tam ENCROACHMENT AGREEMENT This ENCROACHMENT AGREEMENT ("Agreement") is entered into between the CITY OF EDMONDS ("City") and -2- faceee-Ttes I.Lr—. gF"— C'Owner[s]"), in accordance with Chapter 18.70 of the Edmonds Conununit� Development Code. 1. The Provertv. Owner is the owner of that certain real property located at '2c>2- 5-t4 4�,jV-7 -!3 . within the City of Edmonds, Washington, Assessor's Parcel Number and more particularly described as follows or as described 'in Exhibit "X' attached hereto and incorporated herein by reference. 2. The Easement. The City right-of-way adjacent to owner's property or. an' existing easement used for (strike those that don't apply) [street, road, -&4ey,-4r�, sidewalk, -bHccpath,Vedesft+arr-vasemet+, sanitary sew vAiteF,-eteffn, other 3. The Encroachment. The Owner desires to encroach upon the public ,easement and the City hereby covenants and agrees and. grants its perrmission to Owner to allow ay\A (bo�-' To remain in a portion of the City right-of-way/easement. A partial site plan, scaled 1'�--20% showing the location of the e . ncroachment is attached as Exhibit "B" and incorporated by reference. This Agreement is subject to the following terms and conditions: -I of4- a- On behalf of themselves, their successors and assigns, the Owner promises to maintain, repair, remove and/or replace the encroachment located in the easement at their sole expense to the standards established by the'City. All maintenance, repair, removal and/or replacement shall be conducted solely at the Owners' expense. b. The Owner, on behalf of themselves and their successors and assigns, acknowledge that the City had no obligation to approve the encroachment within the easement for the sole benefit of the Owner, and the agreements contained herein, provide sufficient consideration for the Owner and their successors and assigns to maintain, repair, remove and/or replace said encroachment located in the easement at their sole expense in perpetuity. c- . The Owner pronu-ses to indemnify and hold harmless the City, its officers, agents and employees from any loss, claim or liability of any kind or nature arising from or out of its promises contained within this agreement, including any damage that may be caused to the encroachment by the City's operation, maintenance, repair, replacement or other work related to construction activity within the easement This promise to hold harmless and indemnify includes defense by counsel of the City's choosing, the payment of reasonable attorney's fees and court costs. Nothing herein, however, shall be interpreted to require the Owner to indemnify the City from the negligence or intentional tortuous act of its employees, officers, or agents. d. The Owner shall at the request of the City, promptly remove, repair, reconstruct, and/or replace the encroachment at the Owners' sole expense. Upon receipt of notification from the City that the City requires removal of all or portions of the encroachment from within the easement, the Owner will promptly remove those portions of the encroachment from within the easement area as required by the City at their sole expense. If the portions of the encroachment required by the City to be removed are not timely removed by the Owner, they shall be removed by the City at the expense of the Owner, and the, Owner shall reimburse the City for the - costs of removal of the encroachment and disposal of materials as well.as for any increased construction costs or consequential damages incurred by the City due,to the Owners' delay. In ther event that portions of the encroachment must be removed to facilitate utility and/or construction activity by the City within'the- easement or other requirements of the City, the Owner shall be solely responsible for replacement of the encroachment at their expense upon completion of the utility. and/or construction or other activity by the City. e. Whatever rights and obligations were acquired by die City with respect to the easement shall remain and continue in ffill force and effect and shall in no way be affected by City's grant of permission to construct and maintain the encroachment structure. -2 of4- f The property owner is required to provide and continually maintain during the term of the permit a certificate of insurance naming the City as an additional insured, with.respect to liability, and providing that it shall be primary as to any other policy of insurance. A copy of the insurance certificate shall be provided to the City at the: beginning of each calendar year, no later than the 21 " day -of January. 4. Entire Agreement. This Agreement constitutes the entire agreement between the parties with respect to the subject matter hereof and supersedes and replaces all other agreements, oral or written, between the parties with respect to the subject matter. This agreement may not be amended except in writing in a document filed of record with the auditor of Snohomish County, Washington. 5. Notices. Any notice which is required or may be given pursuant to this Agreement shall be sent in writing by United States mail, first class, postage pre -paid, registered or certified with- return receipt requested, or by other comparable commercial means and addressed as follows: to the City: 9 to th e Own er.- D to 110-,, /T Qr QS City Engineer :a-3septA RAInlre LLL City of Edmonds —711K On y- 84 24 s lt�j ,r S- - _,]371 PJVCe 121 Fifth Avenue North /C�S 2A JC t Edmonds, WA 98020 uo" which addresses may be changed from time to time by providing notice to the other party in the manner described above. 6. Waiver. City's consent to or approval of any act or omission by Owner shall not constitute a waiver of any other default by Owner and shall not be deemed a waiver or render unnecessary City's consent for approval to any subsequent act by Owner. A�ay waiver by City of any default must be in writing and shall not, be a waiver of any other.'default concerning the same or any other provision of the Agreement. 7. Termination of Agreement. In addition to any other remedy provided for by law, the City reserves the right to terminate this agreement in the event the encroachment negatively impacts or damages the City's easement and/or underlying utility systems or violates any condition of service adopted by the City, at its sole discretion, as may be necessary to prevent damage to the City's utility system, or any other public facility which may be impacted by the Owners' failure to properly use the easement. 8. Successors and Assigns. This Agreement shall be binding and inure to the benefit of the parties hereto and their respective legal representatives, successors,and assigns. Ownei agrees to incorporate this agreement by reference in any subsequent deeds to the property, but any failure to do so does not invalidate this provision. -3 of4 - 9. Capnity. Each party represents that the person(s) executing this Agreement on behalf of such party has the authority to execute this Agreement and by such signature(s) thereby bid such party. IN WITN-ESS WHEREOF, the parties hereto have executed this Agreement on this 1-1 day of YIr�o--j 20o-7 OWNER(S): By- 0A0�c,-,,q-t�-'By9X 0. 711'2 STATE OF WASHINGTON COUNTY OF SNOHOMISH This day, personally appeared before me, Tos'-p i+ eu to me known to be the person(s) who executed the within and foregoing document and that (helshelthey) lt7�- signed the same as (hislherltheir) 5 free and voluntary act and deed for the uses and purposes therein mentioned. No�ft`aryv Public OTA :0 PUB Typed or Printed Name %0 My Commission expires: op -4of4 - 0 LEGAL DESCRIPTION A TRAGT OF LAND IN THE NORTHEAST GUARTER OF THE SOUTHEAST GUARTER OF THE SOUTHEAST GUARTER OF 5EGTION 25, TONNSHIP 2-7 NORTH, RANOE 3 EAST, N.M., MORE PARTIGULARL-T- DE5GRIBED AS FOLLONS: GOMMENGIN& AT THE SOUTHNEST CORNER OF DAYTON STREET AND FIFTH STREET IN SAID TOV4N OF EDMONDS, GOUNTY OF SNOHOMISH, STATE OF NA5HINOTON; THENGE SOUTH ALONO THE VqE5T LINE OF FIFTH STREET 154 FEET; THENGE AT RIOHT AN&LE5 NEST 125 FEET, MORE OR LESS, TO AN ALLEY; THENGE AT A R16HT AN6LE NORTH ALONO THE LINE OF SAID ALLEY 44 FEET; THENGE AT A RI0HT ANOLE EAST AND PARALLEL TO THE SOUTH LINE 55 FEET; THENGE AT A R161-IT ANOLE NORTH AND P ARA ' LLEL TO THE EAST LINE ciO FEET TO A POINT ON THE SOUTH LINE OF DAYTON STREET; THENGE EAST ALONO SAID LINE OF DAYTON STREET 65 FEET TO THE POINT OF rOMMENGEMENT. 51TUATE IN THE GITY OF EDMONDS, GOUNTY OF SNOHOMISH, STATE OF HASHINOTON. Exhibit 'A' DESCRIPTION OF PROPOSED ENCROACHMENTS: Roof Overhangs: 1) For a distance of 16'-6" west and 2'-8" east of the NE property comer the roof overhang encroaches 2'-8" into the R.O.W for a total SF of 51 SF. 2) For a distance of 18'-0" south and 2'-8" north of the NE property comer the roof overhang encroaches 2'-83/4" into the R.O.W. for a total SF of 56 SF. 3) For a distance of 15' starting 76'-6" south of the NE property comer the roof overhang extends V-93/4" into the R.O.W. for a total of 27 SF. Canopies: 1) Starting 22'-6" south of the NE property comer for a distance of 12' a canopy extends 5'-0" into the R.O.W. followed by a six foot gap then another canopy of identical size followed by a six foot gap and a third and final identical canopy. Total square footage of their encroachment is 180 SF. Footings: The footing encroachments are under the roof encroachments discussed above. 1) For a distance of 13'-6" west starting at the NE property comer the footing encroaches 2" into the R.O.W for a total SF of 2.25 SF. 2) For a distance of 15'-0" south starting at the NE property comer the footing encroaches 2 %" into the R.O.W. for a total SF of 3.5 SF. 3) For a distance of 12' starting 78'-0" south of the NE property comer the footing encroaches 2 1/4" into the R.O.W. for a total of 2.75 SF. 6ttlibl-T "'15" (60 Attachment to Edmonds, WA encroachment document, Bank of Washington, i :2%* FOOTIN& EW-ROACHMENT F - - 11 5%" FOOTINC, --"I (L /. p ENCROACHMENT 1 4 '00 I ENCROACH�qNT Exhibit"B'(,,) NORTH i CC)(\ December 2000 n t - Page 6H-41 C, . S Figure 6H-10. Lane Closure on Minor Street (TA-18) Typical Application 18 See Tables 6H-2 and OH-3 for the meanIng of the syinbols and/or letter codes used in -this fitgure.. I& 16nifonan dad Atenualor (opu0nal) V, Buffer Space (optlonal) R) max. vli Sed. 6101 City of Edmonds Permit No: /2 7e RIGHT -OF- WAY CONSTRUCTION PERMIT Issue Date; z11 7 A. Address or Vicinity of Construction: �20 B. Type of Work (be specific): Rc2 -"4- Jk±= C. Contractor: F-1442* Ct&� C-n.-A'r-ows Contact: &LV=6 Is i. I Mailing Address: I-// 00c, - Phone: 7 S 7 FF� 7 State License Q e s (9 (v 1 3- Liability Insurance-.d;2 Bond: $ Q I D. Building Permit# (if applicable): NO Side Sewer Permit # (if applicable): E. Commercial Subdivision El City Project EUC (PUD, VERIZON3 PSE, AT& T, OVWD) E] Multi -Family Single Family El Other INSPECTOR: F. PAVEMENT CUT: ERYES [I NO G. 'SIZE OF CUT x 157, CONCRETE CUT: El YES nN INDEMNITY. Applicant understands by hislher sik?4;ture to this applicatio?i`h�she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description, whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including -but not limited to the d�jense of any legal proceedings including defense costs and attorneyfees by reason of granting this permit. THE CONTRACTOR IS RESPONSIBLE FOR'WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOLL097NG THE FINAL INSPECTION AND ACCEPTANCE OF THE WORK ESTIMATED R&TORATION FEES 97LL BE HELD UNTIL THE FINAL STREET PATCH IS COMPLETED BYCITYFORCES, AT WHICH TIMEA DEBITOR CREDITIRILL BEPROCESSED FOR ISSUANCE TO THEAPPLICANT. * Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by (WAC) 296-155-305 and must have certification verifying completion of the required training in their possession. 0 Restoration is to, be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City - approved material prior to the end of the workday - NO EXCEPTIONS. + Three sets of construction drawings of proposed work are required with the permit application. CALL DIAL -A -DIG (1-800-424-5555) PRIOR TO BEGINNING WORK i I HA VE READ THE AB.0 VE STA TEMENTS AND UNDERSTAND THE PERMIT REQUIREMENTS AND A CKNO WLEDGE THAT I MUST MAKETHE PINK COPY OF THE PERMITA VAILABLE ON SITE ATALL TIMES FOR INSPECTIONS 6 UPON COMPLETION OF PERMITTED WORK, AN ENGINEERING FINAL INSPECTION IS REQUIRED PER CHAPTER 18.00 OF THE EDMONDS COMMUNITY DEVELOPMENT CODE ,(Phone 425-771-0220, Ext. 1326) FINAL APPROVAL OF PERMITTED WORK. DATE:AihJ_1v0 1 ��insgecr, ry,&naffureo _ a a C'.T. 4D t961-1 e tion U For inspection requirements see Engineering Insp rmation &an, d DAMy Docuinnts)Forms\Engnmg'&OWperinit_.doc rT A 0 76' Le j-VW�-�l if r-cr I i - , cptv- vA%%-r svAvev- A-v WoWv-,N utiv fvjrrw lwc,-V:RACI . ,*,te,:' -16 L vls� P� z. m " L m ------ n A I I I I I 5TH AVENUE SOUTI+ mumu Li APPROVED AS NOTED - BY ENGINEERING ,-T m 1�-a Date: ag'rAi STA-000f11115- .. 1) 2#Vw Do A W 11 Igo 1-7le GARY HAAKENSON CITY OF EDMONDS MAYOR 121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 FAX (425) 771-0221 Website: www.d.edmondsma.us DEVELOPMENT SERVICES DEPARTMENT Planning - Building - Engineering July 17, 2007 Travis J. Falk, Project Manager Wilcox Construction, Inc. 2345 th Avenue South Edmonds, Washington 98020 RE: Bank of Washington @ 202 5th Avenue South, Edmonds Request for Alternate Design to Reduce Grade of Horizontal Drainage Piping Dear Mr. Falk, The City is in receipt of your request (dated July 13, 2007) to reduce the slope in fall for sanitary sewer from 2% to 1.5% for approximately 60 feet of drainage line. The specific governing code provision (2003 Uniform Plumbing Code Section 708.0) requires a uniform slope of not less than 2% unless where it is impractical due to the depth of the street sewer, structural features or the arrangement of any building/structure a slope of not less than 1/8" of an inch per foot or one percent may be approved by the Administrative Authority. Based on the site constraints and pipe location/information provided in your letter the request for below grade waste lines is hereby Approved with the condition that the building waste line be a minimum of 4 inches to maintain adequateflow. Sincerely, Jeannine L. Graf, C.B.O. Building Official Cc: Bank of Washington Street Address File Incorporated August 11, 1890 Sister Citv - Hekinan, Japan WILCOX CONSTRUCTION INC. 234 5th Avenue South - Edmonds. WA SW20 Rhone (425) 774-41 B5 - FAX (425) 774-4167 July 13, 2007 The Cit Yh of Edmonds 1 121 — 5 Avenue North Edmonds, Washington 98020 Re: Reduction in fall for sanitary sewer from 2% to 1.5% Dear Plumbing Engineer, I am writing this letter to request a variance to the standard 2% slope of the plumbing waste line (sanitary sewer) requirement. Due to a conflict in the elevation of the existing 6" sewer stub and the recently installed storm line, there is insufficient elevation to maintain 2% fall in the 3" building waste line. The new sanitary sewer line has been installed in accordance with the permit/construction documents and has the standard/required 2% slope to the point of connection of the plumbing waste line to sanitary sewer connection. The storm was installed per the permit/construction documents and has been inspected, approved and backfilled. Upon potholing the existing 6" sewer, it was found to be located perpendicular to and within 5' of the newly placed storm line. To maintain fall of the 6" sewer and to clear the 8" storm, the new sewer line needed to be routed over the top of storm pipe (the newly installed section of sewer line has been inspected and covered as well). This loss of elevation raised the sewer tie in at the building, resulting in a lack of elevation to obtain the necessary fall in the proposed building waste line. It will be necessary to reduce the slope from 2% to 1.5%. We are prepared to increase the size of the building waste line from 3" to 4" if deemed necessary to maintain adequate flow. Thank you for your consideration in this matter, Sincerely, Travis J. Falk Project Manager JUL I -'!, zu"iu DEPT LLJ 5% Z/UJZJUU4+U/OUU 6 EXISTING i,�APARTMENT u BUILDING AT PROPERTY LINE A6 '5V �'/'7/D V"" ,e,p TAX NO 27032300407900 EMSTING OFFICE i NE CORNER WAVI 0.36 SOUTH, 0.66 I 10D C'Kll'-lMrV*DlKl( 0 0 CITY OF EDMONDS TRAFFIC IMPACT ANALYSIS WORK SHEET Name of Proposed Project: epp Owner/Apolicant: -JD I Name LK-NmWie Street/Mailing Address -12) e7L�L�\/ LJ IF, city State zip Telephone: qZ-!�:- - 87-1 - R-2-q--Z, IVICO(APIP-h %qZ0 fet OIC44 Applicant Contact Person: W 4�; 4r b.s . Name - 5 ocxe Lo Aq Street/Mailing Address 1E5C-LX-1UCAff- LAD V'111- q,�Wcf city State zip Telephone: qq-g -87--L�Awq-�, Traffic Engineer who prepared the Trafflic Impact Analysis: Firm Name 1. PROJECT DESCRIPTION a. Street address (if known): Contact Name Telephone b. Location: & b, UQ C-(D(ZJ,3 4�F r2- 6 V-, 15T14, ANj ff C-, I- fz:>,�J -rc:�o Z;T- (Attach a vicinity map and site plan.) c. Specify existing land use: —,=,t ;TVc>,::> ( VeV-�5+� , d. Specify proposed type and size of development: I-7ZS e. When will the project begin construction and when will it be completed? f. Define proposed access locations: �=Wu— V M 04-- f= 0 1= FSTWt�Ajw- 5 Vt*-- - C>�JLH C)Ff= OF7 t)^-1 MQ V7LLLL-. g. Define proposed sight distance at site egress locations: i eSA2-:r- - cxb4b V�'- Page I 0 0 2. TRIP GENERATION a. Existing Site Trip Generation Table: Land Use Daily (ADT) PM Peak -Hour Trips IN OUT 84S - Gt�.-5 W I Cc�A VE D4(")C-JF- -A'3- 26,&4 b. Proposed Project Trip Generation Table: Land Use Daily (ADT) PM Peak -Hour Trips IN OUT CW2 c. Net New Project Trip Generation Table: Land Use Daily (ADT) PM Peak -Hour Trips IN OUT ckk?, — 6qs 2 (a . & ct d. State assumptions and methodology for internal, link -diverted or passby trips: Page 2 3. TRIP DISTRIBUTION Prepare and attach a graphic showing project trip distribution percentages and assigmnents. 4. SITE ACCESS ROADWAY/DRIVEWAYS AND SAFETY a. Have sight distance requirements at egress location been met per AASHTO requirements? b. Intersection Level of Service Analysis:, Existing Conditions LOS Delays Year of Opening LOS Delays Five Years Beyond Change of Land Use LOS . I Delays (Intersections to be evaluated shall be determined by the City ofEdmonds Traffic Engineer.) c. Describe channelization warrants: (Attach stripingplan.) d. Vehicle Storage/Queuing Analysis (calculate 50% and 95 % queuing lengths): 50% 95% 0 Existing Conditions Year of Opening Five Years Beyond Change of Land Use e. If appropriate, state stop sign and signal warrants: f Summarize local accident history: Page 3 0 0 5. TRAFFIC VOLUMES a. Describe existing ADT and peak -hour counts, including turning movements, on street adjacent to and directly impacted by the project. b. Describe the estimated ADT and peak -hour counts, including turning movements, the year the project is fully open (with and without project traffic). c. Describe the estimated ADT and peak -hour counts, including turning movements, five years after the project has been fully open (with and *ithout project traffic). d. State annual background traffic growth factor and source: 6. LEVEL OF SERVICE ANALYSIS Summarize Level of Service Analysis below and attach supporting LOS analysis documentation. Provide the following documentation for each arterial street or arterial intersection impacted by ten or more peak - hour trips. Other City -planned developments must also be factored into the LOS calculations. Existin2 LOS: Existing Condition: Year of Openin2 LOS: With Project: Without Project: Page 4 0 0 Five Years After Opening LOS: With Project: Without Project: Note any assumptions/variations to standard analysis default values and justifications: 7. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the Edmonds Road Impact Fee Rate Study Table 4 (attached) and as identified in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC 18.82.130. SAENGR\DwTeMCity ProjectATIA Guidefines\TraflnipAnalyWork 9-04.&c Page 5 0 0 zzt CD CD m 11 F= > DAYTON ,D IWO SITE LOGATION MAPLE ST. D--5' TE LOGATION NTS QNJ 0 0 Page 1 of 1 McConnell, Jeanie From: Ron C [rmc59@nwlink.com] /'dc,00 Sent: Tuesday, May 29, 2007 1:47 PM U To: McConnell, Jeanie Cc: tosborne@g-o.com; 'ron 177' Subject: Bank of Washington Traffic Impact Analysis Review Jeanie, The review memo is attached. It is a good report. I have talked with Matt, asking to explain the Table 5 trip mitigation fee calculation He explained that he noticed ITE Trip Generation data being used in Chapter 18.82. He called and asked Don Simms about it and using the newer 7th Edition (now over 3 years old) information. He created Table 5 which replicates the Edmonds Table 4 for mitigation rates and used the newer trip generation rates and pass by in accord with the direction of Don Simms. Trip length and other features of the mitigation table were left the same. I used the 7th Edition rates in the early part of my report before getting to the mitigation table. The point of the early portion of the report is that pass by would be subtracted from the gas station to determine a total. That total would be subtracted from the bank total (reduced for pass by) to determine a net change. The bank results in a reduction of area traffic. The other suggestion to look at trip generation based on employees is just meant to do a reaffirmation if there are questions; the trip generation based on employees could very well be less. GTC used the bank PIVI Peak volume for the analysis which is conservative, using a higher volume. Please let me know if there are questions or more information would assist the process. Please let me know that the report was received .... Thanks Ron Cameron T rfl 5/30/2007 I It r ; 007t 6t� � e��bvrxe, kc. MEMORANDUM TO: JEANIE McCONNELL FROM: RON CAMERON, P.E. DATE: 29 MAY 2007 SUBJECT: REVIEW OF BANK OF WASHINGTON G113SON TRAFFIC CONSULTANTS TRAFFIC IMPACT ANALYSIS CITY OF EDMONDS SNOHOMISH COUNTY G&O NUMBER: 07555 This,,Memorandum provides review comments of the Gibson Traffic Consultants Traffic Impa ct Analysis of the Bank of Washington development that will replace the former gas station/mini mart at the southwest comer of 5h Avenue South and Dayton Street. The following Google Earth map shows the location enclosed in red. Figure 1. Vicinity Map 0 E The Gibson Traffic Consultants Study addresses each of the City of Edmonds eight Traffic Impact Analysis Requirements (#E82 Development Engineering). There are two minor items that could be used if there is substantial concern of the development to reassure the LOS and impact analysis. First, for trip generation of Drive -In Banks, identifying the number of bank employees and using the ITE Trip Generation 7 th Edition to determine trip generation by the number of employees (pages 1676-1684) will serve as a cross check on the trip generation by floor area (pages 1685-1693). This could very well result in an even lower trip generation of the bank, that is there would be less traffic generated based on the number of employees since it is a relatively small bank, is in the center of downtown, and would is more conducive to pedestrian traffic. Second, pass by traffic for both the gas station and the bank should be used in determining the total net change in traffic. In determining the net trip generation, the Gas Station with mini Mart traffic (1,302 daily trips) is subtracted from the Drive in Bank 679.69 trips yielding-631 trips (the new bank will generate 631 fewer trips than gas station mini mart did). Then, 414 pass by trips are subtracted from the 631 and new total of -217 daily trips are shown. These are shown in Table 4. The development trip generation has two different components, the new trip generation which will occur at the driveways, the total for the ITE trip rates. The new street trips are the new development's traffic — the amount of new street traffic which is the new trip generation reduced by the amount of traffic that is already on the street, pass by traffic. This identifies how much less traffic will be generated resulting from the change in use. It should be calculated using the pass by reduction of 56% (Table 5.30 ITE Trip Generation Handbook) applied to the gas station mini mart as well as 47% (Table 5.20) for the drive in bank. The Trip Generation paragraph on page 3 of the report identifies that capacity analysis is made for 356 daily and 66 PM Peak trips. Table 5.20 of the ITE Trip Generation Handbook identifies 47% as the pass by average for drive in Banks which would reduce the 679.69 daily trips to 360 new daily trips and 66 new pin peak trips. The capacity analysis had been conducted using 66 new trips. These are conservative in that, the former gas station and mini mart generated more traffic than the bank will, and there will be a reduction in area traffic resulting from the change. The GTC study is straight forward in analyzing and reporting each of the analysis requirements: access, site description and vicinity (project description), trip distribution, traffic volumes including growth projections and project traffic, level-o-service analysis, and mitigations. Chapter 18.82.040 identifies the mitigation rate for drive in banks at $10.03 per square foot in paragraph BB. The 2,725 square feet drive in bank would have a traffic mitigation of $27,33 1. An 8 pump convenience store gas station would be $2,545.26 per pump, $20,362.08 and would result in mitigations of $6,969. However, the Chapter 18.82 information is based on the 6 1h Edition of the ITE Trip Generation and not the 7th Edition. The Trip Generation is continually updated with findings of additional studies and the figures revised. Matt Palmer, author of the analysis and report, reviewed the change from the 6 Ih to the 7'h Edition with Don Simms who provided the direction to use the newer 7 th Edition ITE data which would update the mitigations of 18.82. Table 5 of the report provides this analysis in accord with Don Simms, the newer ITE trip rates are used as well as pass by rates in calculating the Bank of Washington trip mitigations. Please note, that I used the newer rates in the opening of this report which is common practice, to use the latest Trip Generation edition information. The $4,641.33 identified in the report is consistent with the ITE traffic findings and methodology of the Edmonds Impact process. Yessage Page I of 2 Graf, Jeannine From: Bowman, Duane Sent: Tuesday, August 15, 2006 2:33 PM To: Graf, Jeannine Subject: FW: RE: ARCO CLEANUP Jeannine,, FYI Duane Bowman Development Services Director 425 771-0220 FAX 425 771-0221 ----- Original Message ----- From: Ron Wambolt [mailto:rrwambolt@msn.com] Sent: Tuesday, August 15, 2006 2:29 PM To: Bowman, Duane Subject: Fw: RE: ARCO CLEANUP ----- Original Message ----- From: rrqregg(a)-comcast. net To: Ron Wambolt Sent: Tuesday, August 15, 2006 10:25 AM Subject: FW: RE: ARCO CLEANUP Ron, My consultant just finished meeting with Ecology and filed the enclosed report. ALL: of this information is part of the public record so tomorrow (when I am back in my office) I will send you all of the analysis I have paid to have done on the Delta environmental reports that up till now I was concerned were confidential. IT-171 -------------- Forwarded Message: -------------- From: "Carla Brock" <cbrock@farallonconsulting.com> To: <rrgregg@comcast.net> Subject: RE: ARCO CLEANUP Date: Tue, 15 Aug 2006 16:27:49 +0000 Hi Bob: 8/15/2006 ,Message if Page 2 of 2 I just finished the file review at Ecology and here is what I found... These documents are all in the file, which is public record: Delta Environmental, March 7, 2006, Subsurface Investigation Report Delta Environmental, February 22, 2006, Groundwater Monitoring Report, Third and Fourth Quarters of 2005 Delta Environmental, August 11, 2005, Drainage Water Monitoring Report (footing drain discharge monitoring) Delta Environmental, August 10, 2005, Groundwater Monitoring Report, First and Second Quarters of 2005 Delta Environmental, February 8, 2005, Drainage Water Monitoring Report, Third and Fourth Quarters of 2004 Delta Environmental, August 16, 2004, Drainage Water Monitoring Report, First and Second Quarters of 2004 Delta Environmental, August 10, 2004, Subsurface Investigation Report Pacific Environmental Group, November 13,1995, Soil Sampling Pacific Environmental Group, May 13,1994, Environmental Assessment, Stage 11 Vapor Recovery Installation November 30,1999, Letter from Ecology to Delta Environmental indicating that because soil contains concentrations of GRO and BTEX exceeding the MTCA Method A cleanup levels, further action is necessary September 28, 1999, Letter from Delta Environmental to Ecology requesting review of documents and NFA determination September 9, 1998, Letter to Ecology from Delta Environmental indicating that cleanup at the site is ongoing and all copies of interim reports have been submitted Updated VCP Application, October 25, 2005, with Atlantic Ritchfield as the applicant, signed by Scoff Hooten Original VCP Application, 1995 I have requested copies of both of the 2006 reports, neither of which we have copies of yet. The March 7, 2006 Subsurface Investigation Report documented the installation of two additional monitoring wells at the Site in December 2006. The wells were installed on that little piece of property that juts out to the west and are near the western property line. The results of groundwater samples collected from those wells (named MW-5 and MW-6) detected concentrations of gasoline -range organics at 81,900 micrograms per liter and 9,890 micrograms per liter. That is really high, we expect to see free -phase gasoline when the concentrations are above 20,000 micrograms per liter, so it wouldn't surprise me at all if there is gasoline floating on groundwater at the site. And since the wells are so close to the property line, and groundwater flo w is to the southwest, it is very likely that n ot only the dissolved -phase plume of gasoline has migrated onto other property, but also that the free -phase gasoline is present on other properties. Active remediation is required anytime that free -phase gasoline is present. I will forward you copies of the 2006 reports as soon as I get them ... it usually takes a week or so. Let me know if you have any questions about any of thisl Thanks, Carla 8/15/2006 G , i - '-7, -C- ET F ILE LETMR OF TRANSMMAL Date: November 17, 1992 To: Dave Taylor 18215 72nd Ave. S. Kent WA 98032 Subject: Critical Areas Checkli'st Transmitting: For your information: X As you requested: For your file: Comment and return: Note attachments: Comments: Arco P.O. Box 2570 Los Angeles CA 90051 Planning Division Di-ane Cunn-ingham, Planni,nq Secretary RECEIVED NOV 1 7 1992 PERMIT COUNTER /ago 1941zl Ciq of Edmonds Critical Areas Checklist The Critical Areas Checklist co ntained on this form is to be filled Out by any person preparing a lbe'vel-o'p'ment Permit Application for the City of Edmonds prior to his/her submittal of a development permit to the City. The purpose of the Checklist is to enable City staff to determine whether any potential Critical Areas are or may be present on the subject Property. The information needed to complete the Checklist should be easily available from observations of the site or data available at City Hall (Critical Areas inventories, maps, or soil surveys). An applicant, or his/her representative, must fill Out the checklist, sign and date it, and submit it to the City. The City will review the checklist, make a precursory site visit, and make a determination of the subsequent steps necessary to complete a development permit application. With a signed copy of this form, the applicant should also submit a vicinity map of the parcel with enough detail that City staff can find and identify the subject Parcel(s). In addition, the applicant is encouraged to include, any other pertinent information or studies in conjunction with this Checklist to assist staff in completing their preliminary assessment of the site. I have completed the attached Critical Area Checklist and attest that the answers provided are factual, to the best of my knowledge (fill out the appropriate column be I low). Owner / Applicant: A P Name Title P-0. tx))< -Zg7o Street Address 1, -- - A��.�A loo5 I City, State, ZIP Phone Signature Date Applicant Representative: ID4& -TA-*/.-0K. Name Title /a v 7- r) Street Address �*� I WA 76orz City, State, ZIP Phone 9Signatur7� S-E ��:ET FILE 0 Site Information Project Name: Site Location: Critical Areas Checklist AHIrm Permit -Number -:�a 7, - 57 t' Z Property Tax Account Number: Approximate Site Size (acres or square feet): Have you filled out a Critical Areas Checklist for a project on this site before? General Site Conditions --� C 1. Has'the site been cleared or logged? Date of most recent action:A /A Soils / Topography upmw .4 L " &UP40N." �C-0014:1;1 2. In the Snohomish County Soil Survey, what is the mapped soil type(s)? -Y ro a 7, s tcpom S32r7'0X1 -077-oo 3. Describe the general site topography. Check all that apply. Ylat-- less than 5 feet elevation change over entire site - Rolling: slopes on site generally less than 15% (a vertical rise of 10 feet over a horizontal distance of 66 feet.) Hilly: slopes present on site of more than 15% and less than 30% ( a vertical rise of 10 feet of horizontal distance.) Steep: grades of gre;ater than 30% present on site. Comments Hydrology/Vegetation 4. Site contains ar eas of year-round standing water: f4 0 5. Site contains areas of seasonal standing water: JA 0 —Approx. Depth: 6. Site is in the floodway floodplain W 0 of a water course. 7. Site contains -a creek or an area where water flows across the grounds surface? flows are year-round? Flows are seasonal? 8. Site is primarily: forested meadow s 50MC mixed shrub 9. Obvious wetland is present on site: A0 10. Wetland inventory or map indicates wetland,present on site: 1410 11. Critical Areas inventory or map i ndicates any Critical Area on site: 14 0 TO SUBJECT I AT -DUPLICATE sIGNED DATE SIGNED E e4S469 SEND PARTS 1 AND 3.WITH CARBON INTACf. - PART 3 WILL BE RETURNED WITH REPLY. POLY PAK (50 SETS) 4P 469 DETACH AND FILE FOR FOLLOW-UP IE CITY OF EDMOMME-3 200 DAYTON ST. - EDMONDS. WASHINGTON 98020 - (206) 775-2525 DEPARTMENT OF PUBLIC WORKS Mr. Robert Shaffer Atlantic Richfield Company 8450 7th Southwest Seattle, Washington 98106 Dear Mr. Shaffer: o �� May 2a, 1981 HARVE H. HARRISON MAYOR SUBJECT: DRAINAGE AT ARCO STATION -: 202 5TH AVE. S.- EDM. The approved drainage plan for the recent building permit at the subject address calls for an asphalt berm that has not yet been installed. A copy of a portion of the plan is attached. The catch basin and 8" connection pipe has been installed and approved. To direct the runoff to the basin, however, the asphalt berm is still needed. The neighboring property owner to the west of the rear driveway is claiming that damage is occurring to his prop ' erty due to runoff which would be controlled by the berm. Even though you have,one year from the issuance of the building permit to ins . tall �he facilities, we are urging you to complete this relatively minor part of this project as soon as possible. If you have any questions regarding this matter, please contact Bob Franklin at 771-3202, extension 282. Sincerely, bE E. A P E. yy 7Enaineer 0 RRF: j ky cc: Building Department T. v rz — c'-7 0— %,j r- r-4 i KF I W rA %, r) rL m n-- 4-)V 4 4, C�y P" Al < I \-/ -t, 0 -- h: 0 111 G 1-4 Tt c: " -n- /-o -z J, b r-- IT z 0 F11LE HEARING ON COMPLAINT REGARDING 24-HOUR CONVENIENCE STORE IN DOWNTOWN EDMONDS At the March 17, 1981-Council meeting Ward Phillips had described the problems the neighbors of the..Ar.co:Mini*-Mar:t were experiencing. The complaints were regarding noise from the compressor, glare from the lighting on the building, lack of a public restroom, and alleged police complaints. The Planning Department had contacted Robert Shaffer, the Arco District Manager, who expressed his intent to resolve the problems. He said a restroom facility is being opened to the public, Arco is exploring screening for the lights, and some work had been done to the compressor, reducing the noise level by ten decibels. This was still unsatisfactory for the residential units to the west, and Arco's intent was to silence or relocate the unit. The Police Department had not received any complaints or reports of problems at this location. Planning Director Mary Lou Block reviewed the situation and noted that since this area is zoned BC, there is no limitation on hours of operation. She noted that a revision to the Code could establish specific operating hours in the BC zone as was done for the BN zone, but numerous restaurants in the downtown area currently are open until 2:00 a.m. The hearing was opened to the public. Jim Forden, manager of the Arco Mini -Mart, said Mr. Shaffer had called him this date from Yakima to say he could not be present at this hearing, but that Arco will do whatever is necessary to decrease the noise level and the lighting to a satisfactory level. Mr. Forden said 1/3 of the lights on the canopy are turned off from 10:00 p.m. to 6:00 a.m. because of a complaint he had received from Nick Spanovic, but he said Mr. Spanovic was the only person who had spoken to him about the lights. Mr. Forden said Arco will relocate or insulate the compressor. He took exception to a comment that the mini -mart had become a hangout for kids, and he said he would do what he could to be a good neighbor. Peg Hardesty, 757 Sprague, questioned whether this could become a problem with the store selling beer and wine in the summertime, considering the City's beach problems. Jim Musser, one of the owners of Old Milltown, read a letter of objection to the mini -mart, saying the neon lights and distasteful color scheme are unsightly to the guests at the Old Milltown Restaurant and to anyone entering downtown Edmonds; that the Old Milltown bathrooms have had increased vandalism because the mini -mart customers are directed there; and that the mini -mart appears to have become a "hangout" in Edmonds, which has posed a serious security problem for the Old Milltown tenants. He asked that the mini -mart cease business at 2:00 a.m. W. J. Ashley -Cole, owner of the apartments next to the mini -mart said he had experienced very good rapport with the manager of the mini -mart, but the noise from the compressor had not been decreased adequately, and he asked that it be silenced. Linda Perry, one of Mr. Ashley-Cole's tenants, said she had discussed this problem with the Planning Director and had been assured something would be done about it. She described the compressor as sounding like a jackhammer and said it runs 24 hours. Her front door opens to the compressor and her bedroom window is on the south side and she gets the bright lights. She had purchased blackout shades but said that did not keep out the light. She also said she had to clean up bottles and cans which originate at the mini -mart. Ward Phillips, residing at 522 Dayton St., immediately adjoining the mini -mart, said he also owns property 150' away --the caboose and the warehouse --and he considered the mini -mart to be a "garbage can" to downtown Edmonds. He said it does not have a final occupancy permit and he thought it should be closed right then. He said the people living next to it are suffering at the hands of Arco and that the City should use its authority to stand up to Arco. He thought Arco should be required to put in men's and women's restrooms, that the lights and noise should be eliminated, and that landscaping should be required. He said when he did Milltown he had offered to redo the Arco station and landscape it at his own expense, but Arco had refused the offer because the City did not require it. He said what you can contribute is what is important, not what you can get, and that Arco is not contributing anything. He spoke of the encouragement to keep the residential character in the downtown area. He noted that Mr. Forden is out every morning picking up the area, even if he doesn't own it. He concluded that he had invested in this City and he cares about it, but that he is frustrated about this situation. Regarding landscaping, Ms. Block stated that the ADB had decided not to make them landscape, the area surrounding the building already being asphalted, and in consideration of their removal of a large pole sign. EDMONDS CITY COUNCIL MINUTES Page 3 - April 7, 1981 Jane Cunningham, 1030 Grandview, said she had spent two years and $1,000 on a similar noise problem in her neighborhood, and the noise and vibration from the compressor are very bad. She said it is nice when there is a power outage because then she can go out her front door and it is quiet. No one else wished to speak, and the hearing was closed. Councilwoman Allen thought this was an administrative problem and could be handled by the administration, and she did not understand why it had existed for three months. She thought if they tried to change the requirements of the BC zone they would have problems with other people. She did not want to do anything about lighting restric- tions because that could affect the playfield where they need to have lights. She did not think the Council should take action on this. Councilwoman Jaech noted that one of the main concerns was the lack of a restroom facility and it appeared that would be addressed. She asked about the landscaping and Ms. Block said the City had recommended it, but the ADB had not required it. MOTION: COUNCILWOMAN JAECH MOVED, SECONDED BY COUNCILWOMAN ALLEN, THAT A REPORT BE PROVIDED AT THE APRIL 21, 1981 MEETING INDICATING WHAT WILL BE DONE ABOUT THE LIGHTING, WHEN THE RESTROOMS WILL BE COMPLETED, AND HOW MANY THERE WILL BE. Mayor Harrison agreed that a good deal of this was administrative, and he thought the City could interpret that this is a service station and require two restrooms, and he said if it is within his power he will make that determination. Ms. Block said there is no State require- ment for restrooms and the City would have to amend its ordinance to require rest - rooms. Councilman Kasper noted that a Conditional Use Permit is required in the BN zone but not in the BC, and that the major change here was to eliminate the grease racks and install the grocery section. He noted that a lot of things have changed in the downtown area, one of which is that the Code does not allow anymore apartments downtown in a joint use with commercial use, and a lot of things have moved away from the residential character of the City. He said Mr. Phillips' concern was that Arco was not responding quickly, which puts the City in the position of enforcement. City Attorney Wayne Tanaka said there is the noise ordinance and compliance with the City Code regarding lights, but his office's policy had been not to do a criminal citation if a person is trying to remedy a situation. Councilman Gould said he was also concerned about the man trying to make a business there, as well as the people who are suffering from it. Ms. Block indicated that the first decibel reading was 70-79 and with the insulation the reading was reduced to 69, but the requirement in a commercial area is 60 and there is no requirement to reduce that at night (in a residential area it would be 10 less at night). She said the Planning Department had recommended to them that they get some outside help to correct the problem as what they had done had not corrected it enough. Mr. Fordon was asked about turning the compressor off at night, and he said the milk and meat products would be affected, but he did not know by how much. He added that 1/3 of the lights on the south side have been turned off, but he did not know if there was a difference, and he did not know what had transpired with Arco. THE MOTION THEN CARRIED. Councilman Gould added that he was serious about enforcing the ordinances of the City, and that if the law is not followed the City should pursue it --whether the lawbreaker is big or small. SIX-MONTH REVIEW OF CITY NEWSLETTER Bonnie Morin, Newsletter Editor, reported that she had received 188 responses to the recent public opinion poll taken regarding the newsletter. She said that is a good response statistically (1%-2% being considered good). Of the responses, 86% were favorable and indicated they wished to continue receiving the newsletter. Many of the people opposed to the newsletter were opposed to the cost and there were comments that the news is old by the time it appears in the newsletter. Ms. Morin thought some of the critical comments were valid, and she is trying to make the news more timely and will attempt d ' ifferent approaches on items which have already appeared in the media. She received some comments that even if the material had appeared in local newspapers it might have been missed. She is striving for an earlier publica- tion date, five to seven days before the first of each month. She presented the cost breakdown for 1981, including the increase in postal rates, which will total $20,405.74. and which she noted will average $1.78 per household for the year, or 15d per month. Lloyd Ostrom, representing the Edmonds Concerned Citizens Council, said that body thinks this is a good effort, but they had not expected the newsletter to be a EDMONDS CITY COUNCIL MINUTES Page 4 - April 7, 1981 community events document or a newspaper, but rather more of advanced notice of things to come. They feel the kind of issues which should be given good coverage are those coming up several months in the future, such as the Highway 99 study --who is doing it, where they can get information on it, the final outcome of it. He said if the City can spend the money on it they would like to see it continued, but it can be improved. Fred Ross, 1060 Daley, a long-time newspaper person, said he thought Ms. Morin is doing a fine professional job, but that he had not seen anything in the newsletter that he had not already read in the ' Western Sun or the Enterprise. He thought the newsletter a waste of money and unnecessary. Councilman Gould said the newsletter was created purposely to answer a need in the City and he thought it too early to decide whether it should be continued. He agreed that attempts must be made to make it more effective. Councilman Kasper said he also could not support it if it is not improved, as it now is repetitious. He noted that the Council agenda changes very much, so he thought the only justification would would be to do major features on major problems. DISCUSSION ON PROCEDURE OF APPEALS TO COUNCIL FROM HEARING EXAMINER City Attorney Wayne Tanaka reviewed the written material he had provided the Council, and said the Council must give reasons for their decisions, especially in the cases of variances. He said they should go through the variance criteria and make their findings. He introduced James Driscoll, the Hearing Examiner. Mr. Driscoll said the important thing is to be familiar with the authority of the Hearing Examiner and of the City Council which is set forth in the Community Development Code. He noted that the Council would only hear variances if they were appealed, and he said if they read his decision and the basis for it and compare those to what is required in the Code, they will be going on the record, and hopefully he is capturing the most important parts of the record in his findings and conclusions, and is putting them in his decisions. There had not yet been an appeal. He noted that the elements of the criteria are set forth in State law, and they are very strict criteria and all must be met in one manner or another. In answer to a question from the audience, Council- man Gould said that when the Council hears an appeal they will start from the beginning and it will not be only on the record. This was determined when the Community Develop- ment Code was adopted. PROGRESS REPORT ON NEW LIBRARY Parks and Recreation Director Jim Jessel provided a breakdown of associated costs and discussed the exterior finish of the building. He had taken the Council on a view trip the past weekend to examine concrete block buildings and he now displayed samples of blocks. He then discussed the guidelines to be followed to assure that concrete block exterior walls are maintenance effective. Councilman Kasper said this probably will be the top building the City will ever build, and he was not convinced that the maintenance of such a building in that location was not a gamble over a long period of time. He said the price differential between block or structural concrete is nil, but Arai/Jackson thinks concrete blocks can meet the maintenance needs, and he was doubtful. Councilman Gould said he had confidence in the fact that the building could be done beautifully and satisfactorily, and this was no different from sealing a brick chimney on a house --if it is done right there will be no problem. Public Works Director Fred Herzberg added that the joints on this are designed not to collect water, and Arai/Jackson feels they have provided a structure in keeping with the site, the neighborhood, and the program, and that the City would get a second- best structure if it went with something other than the small concrete block. For MOTION: clarification, COUNCILMAN GOULD MOVED, SECONDED BY COUNCILWOMAN ALLEN, THAT THE TEAM Amended IN CHARGE OF THE LIBRARY PROCEED ON THE BASIS OF USING 4" X 16" CONCRETE BLOCKS IN THE COLOR SHOWN, WITH RAKED JOINTS AS DESCRIBED. COUNCILMAN KASPER AMENDED THE MOTION THAT THIS BE TAKEN BEFORE THE ARCHITECTURAL DESIGN BOARD WITHIN THE NEXT SEVEN DAYS EVEN IF IT REQUIRES A SPECIAL MEETING, AND THAT THE ACCEPTANCE BE DEPENDENT UPON THE CONCURRENCE OF THE ARCHITECTURAL DESIGN BOARD. THE AMENDMENT WAS ACCEPTABLE TO THE MAKER OF THE MOTION AND THE SECOND. THE MOTION CARRIED, AS AMENDED. EDMONDS CITY COUNCIL MINUTES Page 5 - April 7, 1981 % I ft PROPOSED VACATION OF PORTION OF 8TH AVE. N. (APPRAISAL AND SCHROEDER PROPOSAL) Councilman Kasper left the Council Chambers during this discussion. Donald Schroeder of 528 8th Ave. N. had responded to the most recent appraisal which was obtained because Mr. Schroeder thought the previous one was too high. The gist of Mr. Schroeder's letter was that he would be willing to pay $500 for the vacated portion of the street abutting his property, taking into consideration the storTn sewer Mr. Kasper and he will be installing. City Attorney Wayne Tanaka said something like what was asked MOTION: here had never come up before on street vacations. COUNCILWOMAN ALLEN MOVED, SECONDED Withdrawn BY COUNCILMAN NORDQUIST, THAT MR. SCHROEDER AND MR. KASPER BE GRANTED CREDIT FOR THE STORM SEWER THEY WILL INSTALL IN THE AMOUNT OF ONE-HALF THE COST TO EACH, AND THAT THE PORTION OF THE VACATED STREET ABUTTING MR. KASPER'S PARCELS A AND B REVERT BACK TO HIM AT NO COST SINCE THEY ORIGINALLY WERE DEEDED TO THE CITY BY MR. KASPER. Councilwoman Allen said she could not agree to granting credit for easements, as suggested by Mr. Schroeder in his letter, as everyone has to have some kind of easement through their property, but if the storm sewer will cost as much as $1,200 she could see granting credit for one-half of that. This was discussed at length, but problems could be seen. THE MOTION AND THE SECOND WERE WITHDRAWN. Councilman Gould thought the street should be vacated and the lower of the two appraisals should be charged so the parties involved would be treated just the same as anyone else has MOTION: been treated. COUNCILMAN GOULD MOVED, SECONDED BY COUNCILMAN NORDQUIST, THAT THE CITY ATTORNEY BE INSTRUCTED TO DRAFT AN ORDINANCE TO VACATE THIS STREET AT THE PRICE SHOWN ON THE HARRIS APPRAISAL, EXCEPT THAT LOTS A AND B WILL BE AT NO COST TO THE ABUTTING PROPERTY OWNER BECAUSE THEY WILL BE RETURNED TO THE ORIGINAL PROPERTY OWNERS, WHICH IS CONSISTENT WITH THE CITY'S POLICY. MOTION CARRIED, WITH COUNCILWOMAN ALLEN VOTING NO. Councilman Kasper returned following this discussion. COUNCIL Council President Allen advised that the Mayor and she had enrolled in a negotiations seminar, and also that the Mayor will be attending a negotiations workshop in San Francisco May 11-13, 1981. Council President Allen advised that the Mayor, the Finance Director, and she would be attending the AWC convention. Regarding the question of moving the utility billing clerks to the Finance Department, Council President Allen said she had talked to people in both departments and there are some real problems, so she felt no move should be made at this point. COUNCIL - MOTION: WOMAN ALLEN MOVED, SECONDED BY COUNCILMAN NORDQUIST, THAT THE FINANCE DIRECTOR AND THE PUBLIC WORKS DIRECTOR BRING A PROPOSAL TO THE COUNCIL NEXT WEEK FOR HIRING A CONSULTANT FOR NO LONGER THAN TWO MONTHS, WHO IS BOTH AN ACCOUNTANT AND IS FAMILIAR WITH DATA PROCESSING, TO WORK WITH THE UTILITY BILLING PEOPLE TO GET THAT FUNCTION ON LINE WITH THE COMPUTER TO RESOLVE THE CURRENT PROBLEMS. Councilwoman Allen said she thought a third party could resolve the problems. MOTION CARRIED. Council President Allen suggested that the Council have a dinner next week at 6:00 p.m., prior to the Committee meeting, in honor of the retiring Council Secretary. The Council will be advised of the location, and official notices will be made. There was no further business to come before the Council, and the meeting adjourned at 10:25 p.m. EDMONDS CITY COUNCIL MINUTES Page 6-- April 7, 1981 �_,ULETb` FILE WITH THE MODIFICATION THAT THE WORD "SHOULD" BE CHANGED TO "SHALL" IN THOSE RECOM- MENDATIONS NUMBERED 1, 2, 3, 5, 6, 7, 8, 9, 11, 12, 13, AND 14. MOTION CARRIED. Councilman Naughten commented that he had never seen a review done more comprehen- sively than is being done through the Hearing Examiner process. He said this Hearing Examiner Report was a professional document the likes of which he had never seen before and that it was a testimonial to the Hearing Examiner process. REPORT ON LIGHTING, NOISE, AND RESTROOMS AT CONVENIENCE STORE�AT 5tHIAND DAYTON Associate Planner Duane Bowman reported that the ADB had met the previous day and passed a motion that the generator be relocated to the northeast corner of the building behind the wing wall with the 24-hour sign, and that it be screened and fully enclosed and a sound block be put on top of it. They approved the valance around the lights and required that a dimmer be placed on the lights from 10:00 p.m. to 7:00 a.m. Mr. Bowman said that had been checked the previous evening and it did make a big difference. He said Ward Phillips had indicated that the valance corrected the situation of lights shining into the restaurant, and that Arco is in the process of relocati.ng the generator and an acoustical engineer is working on a sound block for it. The restroom had not been included in the ADB motion, but Mayor Harrison said it had been agreed that the door to the restroom would be opened. Councilwoman Allen observed that they were going out of their way to be cooperative because there is nothing in the Code that requires that they have a restroom. Jim Fordon, manager of the Arco Mini -Mart, stated that in many of the comments made on this at the Council meeting and in the press it appeared that the merchants and the community were upset, but there were only two people who complained. He said the merchants at Old Milltown had given him support and he was unaware of the light problem at the apartment house until the night of the Council meeting. He observed that these problems could have been resolved if the people had talked to him. PROGRESS REPORT ON NEW LIBRARY Parks and Recreation Director Jim Jessel reported that the ADB had discussed the exterior of the new library and had approved 4"x 16" block units with raked joints. The overall design will be discussed at their May meeting. He said the specifications are about ready to be finalized and on or about May 15 the team will meet to make the determinations. One question regarding furniture was whether it should be ordered soon and then get it stored or wait until the building is 90% finished and put in the order. He had discussed this with some local merchants who indicated that all the interior furnishings could be ordered now and they would store them at no charge until they are ready for installation. It was noted that the Library Board was concerned about setting priorities for spending "extra" funds, and Mr. Jessel said there are no "extra" funds, everything is in the base bid or the bid alternates. Librarian Kathy Turner said the interior decorator is expected to have her suggestions to the Library Board at about the same time as the bids are awarded, and the Library Board will start its fund-raising efforts in October. Regarding the 1% for arts proposals, Mr. Jessel said a prospectus had been prepared asking for proposals and indicating that numerous places on the site would be appropriate. Arai/Jackson had done a comprehensive study on where to locate art pieces, and Mr. Jessel was hopeful of having two or three pieces instead of one. Library Board member Don Schroeder stated that usually the building is up before the artist does the artwork, and he thought it in the best interest of the City to wait until then as it is helpful to the artist to see the building instead of only blueprints of it. NEGOTIATIONS DISCUSSION City Attorney Doug Albright stated that negotiations generally get underway in late May or early June. The Police and Fire units are covered by the binding arbitration statute, but if negotiations reach an impasse arbitration most likely would not occur until at least November. The Service Employees International Union (SEIU) does not yet have a contract, but that unit should be certified soon and they will be pressing for a contract. Mr. Albright said the immediate action is to formulate the City policy and negotiations team and be prepared to present the City's case to the bargaining units. Mayor Harrison noted that the meeting scheduled the previous week with the law enforcement unit had been cancelled in light of the letter sent by the Council President. Council President Allen asked if an Executive Session would be EDMONDS CITY COUNCIL MINUTES Page 6 - April 21, 1981 FILE 40 HARVE H. HARRISON COTY OF 200 DAYTON ST. - EDMONDS, WASHINGTON 98020 - (206) 17!� 2":`, MAYOR DEPARTMENT OF PUBLIC WORKS March 16, 1981 Dear Resident: On February 17, 1981, the Edmonds City Council passed Resolution 488 for construction, reconstruction and 'repair of deteriorated sidewalks. A Public hearing will be held in the Council Chambers at the'Civic Center on April 21,1981 at 7:30 P.M. You are invited to attend this hearing for discussing repair of portions of deteriorated sidewalk / abutting your property. The improvement of sidewalks in need of repair at the expense of the abutting property owner is provided by City Ordinance, Chapter 7.20 and Revised Code of Washington, Chapter 35.68. The areas needing repair have heen marked in paint on the sidewalk adjoining your pronerty. Reconstruction and repair of these sidewalks must be completed on or before September 1, 1981. In the event improvements are not completed within the above specified time, the City will perform and complete the improvements at the expense oE the abutting property owner. This action is in response to many citizen requests and pedestrian falling accidents which have been increasing in recent years as a result of sidewalk deterioration and increased pedestrian traffic. Sincerely, FRED F. HERZBERG Director of Public Works SEATTLE-FIRSTNATIONAL BANK DOUGLAS G. ROGERS Assistant Vice President FILE November 17, 1980 City of Edmonds Civic Center 250 Fifth Avenue North Edmonds, Washington 98020 Attention: Mr. Jim Adams Gentlemen: BALLARD BRANCH Re: Edmonds File: Arco 202 - 5th Street Developer: Davis Construction Proposed Project: Mini Market Remodel Loan No.: Commitment - Not Numbered With reference to the above identified matter, this will certify that this institution has a savings actount (or loan) for the above referenced developer for project so identified. In consideration of the permitted development of the property, and in lieu of a performance bond, this institution hereby agrees that it will freeze the following sum of money for the required improvements pending written authorization by the City of Edmonds. Improvements required per City codes and requirements established by the City Engineer, City Planner, Planning Commission and City Council. TOTAL: $884.40 The total sum just indicated will be withheld by this institution from any disbursements of any kind until written authorization has been received by the institution from the City of Edmonds to release the sum of money indicated by the written authorization from the City. The design, location, materials, and other specifications for the indicated improvements are those required by the City of Edmonds as appear in the above referenced Edmonds file. A 2UIO NUH I I IWLS I MAHKL I �; I I it-[. I/ SLA I ILL. WASH ING I UN 98101 ILLI 111 ION C- (206) 583-3663 W. City of Edmonds Civic Center Edmonds, Washington - 2 - November 17, 1980 In the event the developer fails to complete the indicated improvements within two months, the City of Edmonds may demand that the improvements be installed or completed immediately to City standards and the balance of the frozen funds be utilized for said installation or completion of improvements. It is expressly agreed that any funds maintained in this account shall be released to the City of Edmonds upon demand being made by said City. DGR: cap Agreed to and Approved: /B/�ft'et",and Title Si cerely, Dougl s G. Rogers Assistant Vice President FILELLD.YD'V. DAVIS PAII�HAEL J. DAVIS oavij eo"i teacamy ea 6425- 212TH STREET SOUTHWEST LYNNWOOD, WASHINGTON 98036 775-9491 LYNNWOOD - 7133-5959 SEATTLE November 14, 1980 CITY OF EDMONDS 200 Dayton Edmonds WA 98020 REt 202 5th. Arco Minimarket Conversion ATTNt J. E. Adams RES. 321-6494 WHIDaEy ISLAND RES. 321-1250 WHIDBE� 15'--ND Following is our cost breakdown to furnish and install (1) CB15 catch basin and approximately 14LF of 8" rubber gasket concrete pipe including fittings and turn downt CB 15 $ 97.00 Riser 38,00 Frame & grate 117-13 14LF of 8" concrete RG pipe @ $1.90/LP 26.6o (2) 1/8 bends @ $19.84 39.68 (1) Tee @ $17-59 17-59 4 hour minimum case 480 hoe @ $39-50 158-00 8 hrs labor @ t22.00 176.00 670.00 20% OH & Profit 134.00 $ 804.00 10% marrin per ordinance 80.4o DAVIS NSTRITCTION COMPANY R. M. Ga gh r rmg/r .40 r Z. FI OPY NEMO TO: FROM: SUBJECT: FILE October 28, 1980 Architectural:Design.Board Engineering Division COM11ENTS FOR NOVEMBER, 1980 A.D.B. MEETING The Engineering Division has the following comments on the hearings to come before the Architectural Design Board: CONSENT AGENDA, ADB-76-80 SUSAN ARBURY - Review of signs for child care center at 7802 196th St. S.W. Engineering has no objections to this item. ADB-78-80 BARCLAY-SHELTON DANCE CENTER - Review of signs for dance center at 413 Bell Street Engineering has no comment on this item. ADB-69-80 ATLANTIC - RICHFIELD - Review of monument sign.and land- scaping for existing ARCO station at 202:-:5th*�Ave"..-S...., A Street Use Permit is required for this sign. ADB-84-80 GREATER SEATTLE INVESTMENT - Review of existing signs for (1) "The Town Shop" at 406 Main Street and (2) "The Scan- dinavian Shop" at 402 Main Street Street Use Permits are required for both of the signs. ADB-71-80 R. L. HALE - Review of site landscape plan for triplex at 528 'Dayton Street. Engineering has no further requirements for this project than those assigned at the October 8, 1980 A.D.B. Meeting. AGENDA. ADB-79-80 JAMES DOBRICK - Review of site, landscaping, elevations anU signs for eight unit apartment at 7423 208th St. S.W. This applicant should be made aware of the following re- 2 W 31 ZO BUILDING DIVIS101 PERMIT APPLICATIOI NAME (OR NAME OF BUSINESS 4 IU- W i.- FUDRESS C. Y 1A1- 0 ADDRESS I- U -K M CITY I- z 0 U hETATt LA /7, z 0 I- L it U ,4 W 0 .J .J Applicant Fill Inside Heavy Lines LEPHONE NUMBER �-' -: 5 ?- 5; , ",; 7 LEPHONE NUMBER LEPHONE NUMBER rV LICENSE NUMBEW or Attach Four Copies) F� P49W RESIDENTIAL NON-RESIDENJTIAL ADD DEMOLISH ALTER EXCAVATE OR FILL AS -LINE SIGN RETAINING WALL FENCE I— X FT) FRONT FIRE ZONE TY I SPECIAL INSPECT&W REQUIRED 0 YES No PLAN CHECKED BY REPAIR PR9-MQVC INSP. swim POOL IPLAN REMARKS z NUMBER Of' STO "UM OCR OF OWE LLING UNITS NATURE OF WORK TO BE DONE U 0 CHECK FEE PLOT PLAN' 211--v BUILDING PLUMBING MECHANICAL FENCE SIGN In "Applicant, on behalf of his or her spouse, heirs, assigns und 1A W successors in interest, agrees to indemnify, defend and hold harmless .J 2 the City of Edmonds, Washington, its officials, employees. and M agents from any and all claims for damages of whatever nature, i ( arising directly or indirectly from the issuance of this permit. lssu- RETAINING WALL SWIMMING POOL a Iancc of this permit shall not be deemed to modify, waive or reduce anv renuirement of any City Ordinance nor limit in any way the USE ERMIT TILE ZONE UMBER JOB ADDRESS LEGAL DESCRIPTION I SUBDIVISION I SHORT SUB -WO. PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP EXISTING LI, e7 PROPOSED /q.1 DEFICIENCY OF RIGHT OF WAY_4r' PUBLIC IMPROVEMENTS REQUIRED 0 DRA:NAGE IMPROVEMENTS REQUIRED 0 DRA NAGE PLAN REQUIRED x— UNDERGROUND WIRING REQUIRED 0 CONNECTION TO SANITARY SEWER SEPTIC TANK PERMIT REO-D 0 "I NO. ELEVATION OF PROPERTY CORNERS 0 & FOOTINGS REO'D 1 SEE ENGINEERING MEMO DATED CHECKED BY 1`4 1 L 411- METER SIZE BUILDING SUPP LY SIZE SIGN AREA ED JCOMENV. REVI EW I AOB NO. ALLOWED I PROPIOS PLETI EXEMPT I SHORELINE REMARKS VARIANCE OR CU PLANNING REVIEW BY DATE YARDS I LOT COVERAGE SIDE REAR PE OF CONSTRUCTION I CODE lHEIGHT I GROUP I LOAD THIS SITE IS LOCATED IN THE CITY OF EDMONDS. LOCAL SALES TAX SHOULD BE CODED 31.04. VALUATION FEE -:5� 4/10 E I "PUBLIC WORKS DEPARTMENr CHECKLIST BUILDING PERNIT REVIEW .2o,�2 5� 14V, S - �/o (address) (date) Street Right -of -Way Existing_______��...�REQD Z H I Access Easements Existing Mo L4T&-7,�h,_!nX/r�-__REQD g Utility Easement Exist' 1V I / lng D W Lot Per Subdivision Plat Assessor Map W Site Plan Checke'd for Accuracy__,,,_� Underground 14iring Reqd. 1-4 0 Check Accuracy gal Desc4ption Z if Review by Date A0 -;2�1-,fd Existing Water Main Size /,,Z,,C1 Water Main Required 014 Service Line Required Hydrant Size Exist' 94 Hydrant Reqd Per Fire Code —Size W Detector Check Meter Reqd. E-1 Cross Connection Inspecti Fire Department ConTnents Water Meter Charge Reqd. 03��� Review by. //13_�� Date Septic Tank Design Approved Date Septic Tank Permit Reqd._ Permit No. Sanitary Sewer Availability Proj Drawing No. Z File No. C4 Side Sewer Availability A.Z �P_10*11&.W�"W_ Sanitary Sewer Connection Fee Req. :3: Review by A6A4:2ZX Date A>- W In Open Ditch Existing 4e-� _.Req d. Z Culvert Reqd. Size c4 Catch Basin Reqd. Indicate an Site Plan 0 Shoulder drainage maintain collection on swale open runoff � P &�_ En Manhole reqd. Indicate an Site Plan Soil Conditions and Ground Water Field Checked— /W. Review by _,Ag!5��.._Date Revised: 1v10-1977 Page 2 0 r6 C61 TO: FROM: SUBJECT: DATE: /'�q --lAfo Building Division Community Development Department Engineering Division Public Works Department 5—J-YL- Ave � f After review of the subject Building Permit application, we have the following comments: 1. Connection to City water system required. 2. Connection to City sanitary sewer system required. 3. Ripht-of-wav Permit required -for any work on City Pi�operty. 4, Driveway slope not to exceed 14%. 5. Backwater valve required if downstairs plumbing is below elevation of upstream manhole. 6. Water and sewer lines to be separated by 10 foot minimum. K NeW ,"a 17ra 116 /�' . Crrt KV �V, 161�4 ileW Signature V. V.SS U.S.A. RECORD OF FEE PROPERTY ss No. 82*2-11 ATLANTIC RICHFIELD COMPANY (Successor to Richfield Oil Corporation) (NAME OF COMPANY) City Edmonds County Snohomish State Washington Region Northwest Street Address SWC 5th and Dayton Sts. Kind of Property Service Stat ion - Construction of new SS facilities completed 1-29-54 Purchased From Rudolph 1. Nichols and Gertrude A. Nichols, his wife Acquisition Dot* 6-28-46 deed dated 6-12-46 Dead Recorded 6-28-46, Bk 373, Pg 486, Deed Records, Snohomish County Legal Description A tract of land in the NEJ of the SEJ of the SEI of Sec. 23, T 27 Nj R 3 E, of W. M., more particularly described as follows: Comm at the SWC of Dayton St and 5th St in said Town of Edmonds, County of Snohomish, State of Washington; th S along the W line of 5th St 134 ft; th at a r/angle W 123 ft, more or less, to an alley; th at a r/angle N along the line of said alley 44 ft; th at a r/angle E and parallel to the S line 58 ft; th at a r/angle N and parallel to the E line 90 ft to a pt on the S line of Dayton St; th E along said line of Dayton St 65 ft to the pt of Comm. REMARKS: 1. Richfield has been in possession of a portion of the above described real property since 5-28-40 pursuant to terms of lease dated 9-11-39, which lease terminated 6-28-46 by reason of merger of titles. Brief Re -Issued: 5-5-72 Copies to: Raney Collier Douglas Boettcher Berger (2)- File (2) Bacon OCT E E 0 4.1s.20 CROSS - INDEX AND REVIEW ASSIdNMENrS INITIATIN4 ACTION- ADO-1-ci-k DATE 9-1114-0 PArQE OF OWNER NAMEJ' X7f 60 ADDRESS* - APPLICANT NAME: ADDRESS., SITE LOCATION OR ADDRESS: �2-0-7- A 0 N E,' , 9��, - LEC%AL DESCRIPTION: ATrACHED FILE X. Olt TYPE OF ACTION :E N,4v R, 1) 1 V. REC 1). DATE jo Ul %k W) z Ui o U w p us, 5-- x z -.4 FOR MEETING PATFE F-SUILT's ct FILED IN 41 �w T-0-14 1C.4c. t: Z 12 t In z ac cl v N E X T MEETING DATE 0 'u I*- U) a 10 V) (n (e)- 4,00 - Z -7 -,F6 ENGINEERING REVIEWS C6 ASSIONEP DATE TO MOTE s DATE By U. AS I NED DATE ITO NOTES DATE BY PREVIOUS 141STORY SITE REVIEW V(SIT UTILI.TIES PJtAJNA4E/r*P,0.SAAP)4Y srREErs/SIDEWALKS TRAFFICIPARKIN6 3740NINCS CODE FIRE MAP-SHAL R. B. Shaffer FieldAlWiso ARCO Petroleum Products Company S. W. FILE # Is Con n & nance 8450 .7th Avenue 2� daint Seattle, Washington 98106 '� SITE PO� Telephone 206 762 7842 Answering Service 206 682 9389 NG PLANS (3): ELEVATIONS LANDSCAPE YUa— �MENTAL DATA Receipt kHIBITS (3) ARCHIT'. 'Nor bDIFICATIONS TO FILE NUMBER: Division of AtlanticRichfieldr-ompany � I DAT is OlsTNER/REPRESENTATIV PHONE ? Z5�2; 7 ZIP CODE ADDRESS,5F'Z-� HONE-7/,5 - z9!�� 7 CONTACT PERSON 7'f /5 ZIP CODE ADDRES ARCHITECT/DESIGNE PHONE DRESS ZONING__�� PROPERTY AD -S LEGAL DESCRIPTIO PLANS SUBMITTED FOR APPROVAL: 1. Building Plans — Preliminar Final Site Plan Landscape PlanL__ -:�L_Elevat ions___ 2. Sign Elevations— -2.2— Site Plan-- Landscape Plan___.Z> 12/78 3. Modification of previous approval EXISTING USE OF PROPERTY — DESCRIPTION OF PROPOSAL APPROXIMATE DATE WORK WILL BEGIN ON PROJECT 511)"11.1ve- P e_-�PX' 7— ESTIMATED TIME FOR COMPLETION OF WO P j-<'< I (we) hereby certify to the best of my (our) knowledge, that the statements and -t f #-4-- contained herein are, in all respects, true and correct. LL W&- CITY of EDMONDS BUSINW LICENSE APPLICATION DATE LICENSE NO. Civic Center - Edmonds, Washington 98020 ANNUAL FEES City Cle-0 * Phone 775-2525 PENALTY AFTER FEB. 15 J__� El HOME OCCUPATION INSTRUCTIONS: CLASS [YEAR I LIC. EFFEC. DATE-IFTEASCF. LI(9.%0rEC. $10.00 (A) ADDITIONAL $5.00 0 1, /) • All items must be completed' /,? � I I I I I I I I I )(SMALL BUSINESS or application will not be ac- RECEIPT NO. DATE PAID PRINT'XII $15.00 (B) ADDITIONAL $7.50 0 cepted. _J.zr�. v;,1/11 z5,111-d IN SPEC. Box 0 Business with 10 or FOR ISSUE OF • Sign and return application FEE PAID PENALTY PAID CORRECTED more employees ADDITIONAL $25.00 0 LICENSE WITH with fee. Renewals received I I I I I '_ 'LC'ACTION. $50.00 (C) after February 15 must pay K NEW APPLICATION (LA) penalty in addition to fee. 0 RENEWAL (LB) NEW BUSINESSES AFTER 0 CHANGE (LC) JULY 31, 1/2 FEE. (PLEASE MAKE ANY NECESSARY CHANGES) 0 DELETE (LD) NAME OF FIRM BUSINESS PHONE NO. OF EMPLOYEES etta A�ecc, 9 -) f- - � 3 6 3' MAILING ADDRESS NATURE OF BUSINES� ,9 leo 61 BUSINESS ADDRESS INDIVIDUAL PARTNERSHIP CORPORATION (S) (P) P OWNERS NAME HOME ADDRESS 'J. 1-2- 1-11-e-,OeAl HOME PHONE DATE OF BIRTH PLACE OF BIRTFi, SOCIAL SECURITY NUMBER OVV.Y 7F�9 I 9b Zle 14-1- /3�_-*ovopaq )' uj Z_ EMERGENCY NOTIFICATION: (1) NAME & TELEPHONE C', C: - ­9 ­07VA tF46 _162 =11111111111(w C�Q 3,2 (PLEASE LIST TWO) (2) NAME & TELEPHONE —/,,— L.,12o- - 0 "0q,0 WASHINGTON STATE TAX NO. APPLICANT'S SIGNATUR�-_`j STAFF REVIEW - DO NOT WRITE BELOW THIS UNt 6�� FILL IN LAND USE CODE, LIFIR NUMBERS, ZONING, ETC. CHECK APPROVAL OR DISAPPROVAL, DATE, AND SIGN. IF DISAPPROVAL, PLEASE COMPLETE "COMMENT" SECTION. ROUTE TO NEXT DEPARTMENT ON LIST. PLANNING DEPARTMENT DATE 8/L Q LAND USE CODE ZONING CODE 'AL APPROVE 0 DISAPPROVE SIGNATURE )(�� I I - I I CONDITIONAL USE PERMIT COMMENTS BUILDING DEPARTMENT DATE N-`APPROVE 0 *DISAPPROVE SIGNATURE A- PORI— COMMENTS: I I I CAPACITY: (NO. UNITS, APTS., OFFICES, SEATS, BEDS, STUM�TS) Buildigg Permit E3 Hotel/Motel (L) I I 1 El 0 Apt. Bldg. Office Bldg. (A) (0) Occupancy 0 Restaurant (R) Group 0 Hosp/Nurs Home (H) 0 School - I (S) FIRE DEPARTMENT DATE --- 9 - R - 5?0-- I.I.F.I.R. I APPROVE 0 DISAPPROVE SIGNATURE S'CXZ 4221�� 1:517171 COMMENTS: POLICE DEPARTMENT 'Z,APPROVE DATE 9 SIGNATURE 0 DISAPPROVE COMMENTS: PUBLIC WORKS DEPARTMENT 0 APPROVE 0 DISAPPROVE DATE _2Z� /JV SIGNATURE COMMENTS: PLEASE RFTLJRN TO rITY r.1 ;=PK ;15 V - /-/7 - 7-d B CITY of EDMONDS " "'S USIt� S LICENSE APPLICATION Civic Center Edmonds, Washington 9W20 City Clerk Phone 775-2525 INSTRUCTIONS: CLASS YE • All items must be completed or application will not be ac- RECEIPT cepted. • Sign and return application F Po with fee. Renewals received after February 15 must pay penalty in addition to fee. NEW BUSINESSES AFTER JULY 31, 1/2 FEE. (PLEASE NAME OF FIRM MAILING ADDRESS x BUSINESS ADDRESS OWNERSNAME HOME PH�ONE DAT E M IC TI t MAR�GENCY NOTIFICATI t (PLEASE LIST TW ) FILE F A;R. F EC, A HLA50, LIC NO.ISPECj NO. DATE PAID PRINT *X' IN SPEC. BOX VD PENALT PAID FOR ISSUE OF CORRECTED L IC ICENSE WITH E ' LC LC'ACTION. CTIO1 MAKE ANY NECESSARY CHANG t DATE LICENSE NO. ANNUAL FEES PENALTY AF'�� ER FEB. 15 HOME OCCUPATION $10.00 (A) ADDITIONAL "5.00 D SMALL BUSINESS $15.00 (B) ADDITIONAL $7-0 0 Business with 10 or more employees ADDITIONAL $25.00 0 $50.00 (C) ZN_EW APPLICATION (LA), *00RENEWAL (LB) 0 CHANGE (LC) 0 DELETE It M BUSINESS PHONE NATURE OF BUSINESS OF EMP INDIVIDUAL PARTNERSHIP CORPORATION E� (S) (P) HOME ADDRF--55 7,, BIP/TH I ��,ACE OF U2 b)� I I C " / f- " (1� NAME &TELEPHONE — (2) NAME & TELEPHONE 4' xi C WASHINGTON STATE TAX NO.Z -L e APPLICANT'S SIGNATURE SOCIAL SECURITY7NUMBER DO NOT WRITE BELOW THIS LIR? STAFF REVIEW: FILL IN LAND USE CODE, LIFIR NUMBERS, ZONING, ETC - CHECK APPROVAL OR DISAPPROVAL, DATE, AND SIGN. IF DISAPPROVAL, PLEASE COMPLETE "COMMENT" SECTION. ROUTE TO NEXT DEPARTMENT ON LIST. PLANNING DEPARTMENT DATE Fb LAND USE CO, DE ZONING CODE �;WROVE 0 DISAPPROVE S I G N AT U R E at. �iz� E:[= 4tl, 4,, CONDITIONAL USE PERMIT COMMENTS E= AOLDING DEPARTMENT 40 APPROVE DATE 2 0 DISAPPROVE __7 Buildi 0 Hotel/Motel SIGNATURE Permit 0 Apt. Bldg. (A) I I )!� Office Bldg. (0) COMMENTS: Occupancy 0 Restaurant (R) 0 Hosp/Nurs Home (H) —I CAPACITY: (NO. UNITS, APTS., OFFICES, SEATS, BEDS, STUDENTS) 0 School (S) FIRE DEPARTMENT DATE co, U.F.IoR. ;(APPROVE 0 DISAPPROVE SIGNATURE E= COMMENTS: E DEPARTMENT L PPF M., DATE r ROVE 0 DISAPPROVE SIGNATURE -let— COMMENTS: PUBLIC WORKS DEPARTMENT 0 APPROVE LJ DISAPPROVE DATE SIGNATURE COMMENTS: APPLICATION The City of Edmonds for SIDE SEWER PMMIT NEW CONSTRUCTION 0 REPAIRS 0 EASEMENT No . .......................................... 103-06600 O`WNER. .................. Rlahf�e-Ld ... Ser ...... atation. ........................... CONTRACTOR ..... - ............ ................................... ...... ............. -- .................. PERMIT No . ...................... 202 5th Ave. S. ADDRESS..................................................................................... - ................... LEGAL DESCRIPTION: LOT No . .................. ........................... BLOCK No . ............................................ NAME OF ADDITION ........................ �"Ul Dye Te3ted On Sewer June, 1972 Approved: DATE................................................ BY- ........................................................ The City of Edmonds Side Sewer Drawing EASEMENT NO . ................... 101-06600 NEW CONSTRUCTION F] REPAIRS LID NO. - .............. .. ASMT. NO . .................. OWNER ... BEF----BEE---ARCO --- SATIO-H -------------------------------------- CONTRACTOR .................................................................. - .......... ----- PERMIT NO. JOB ADDRESS ----- 2.0-2 --- .... 5T-H..-,A,, V- L� ....... S ------------------------------------- LEGAL DESCRIPTION: LOT NO . ...................................... BLOCK NO . ................ NAME OF ADDITION ......................... DYE TESTED ON SETc-TER Approved: PWW-0001-11/75 (REV.11/78) DATE -------------------------------------------- By ------------------------------- ...................... 4 1 16wl'' JX CONSTRUCTION, INC 234 5th AVENUE SOUTH EDMONDS, WA 98020 Ph: (425) 774-4185 Job: 07-3594 Bank of WA Edmonds 202 - 5th Avenue S. Edmonds, WA 98020 Spec Section Title: Submittal Title: Contractor: WILCOX CONSTRUCTION, INC Subcontractor: -0Imensbns--hc— Mike PeF;y -7 Submittal Spec Section No: 2-770 Submittal No: 5 Revision No: 0 Sent Date: 7/11/2007 n ; % I If. C �' ;++ I r- recast Concrme etenton cau U111 42 Wil UIX w a � Iftw '"w Is Contr tor's SC04STRUCTION71NC. NOEKCEPnM [3 REWSES TAKEN RESUBWr 13 MAKEcomirnm 13 SUBMW NWW SPECRM13A _1/ 13 REECTED DATE By � 0* ITHIS REVIEW DOES NOTRELIEVETHESUBCONTRACTORMI)fx LIER OF HIS RESPONSIBILITY FOR CORRECTNESS OF DIMEN- SIONS. QUANTITIES, AND SIZES, OR PROPER DESIGN OF UMIAIL0 '%UK1b itilZoMqAPPKCV%ttOFtXI-AKlUt(tl-MUM Engineer's Stamp CIV COPY U Project N=ber- 2007.010.017 Page 1 of 2-0 DESIGN CONTUTATIONS FOR . Bank of Washington 141-011 x 241-011 x 71-011 I.D. Detention Vault WIL PREPARED FOR: Granite Precast 4116 Bakerview Spur Bellingham, Washington 98226 UNWATRU�� E N G I N E. E R S -231 EFAP.qw: w RESUBMrr C3 SUBMIT SPEC4REDITE?A C3 REJECTED -7 THIS REVIEW DOES NOTRELIEVE THE LIEROF HIS RESPONSIBILITY FOR CORREMN.' �.AE SIONS, QUANTITIES, AND SIZES, OR PROPER = DETAILS NOR IS THIS AN APPROVAL OF OEP;kW1 Li CONTRACT DRAWINGS OR SPECIFICAT04S. RECEIVED JUL 0 9 2007 WILCOX CONST. INC. %MUCO"O"A" CONSTRUCTION, INC. VE 140 EXCEMM 0 REVISE& TAKEN RESUBMrr C3 MAKECORRECTONS [3 SuBmIT NOTED SPECIREDITEPA REJECTED DATE -11 Iblo-1 BY0 n:2 i-t-- I / C" THIS REVIEW DOES NOTRELIEVii THE SUBOONTRACTOWSM LIER OF HIS RESPONSIBILITY FOR CORRECTNESS OF DIME* SIONS, QUANTITIES, AND SIZES, OR PROPER DESIGN OF DErAILS'NOR IS THIS AN APPROVAL OF DEPARTURE FROM CONTRACT DRAWINGS OR SPECIFICATIONS. mton, New York 13 901 FAX: 607-231-6650 taengineers.com EXPIRES 8/251 -P--47 7 - 3 - 0-7- m 15'-7" ,,I . � A '--A' 94, M" REINFORCING SECTION M* DESIGN NOTES AS PROVIDED BY EORo l.DESIGNED IN ACCORDANCE WITH AASHTO 17TH EDITION FOR HS-20 LIVE LOAD. ASSUMPTIONS' CM AE VERIFIM BY EOR) 1. EARTH COVER = 2'-0" MAX. 2. UNIT WEIGHT OF SOIL = 120 PCF 3. BAR COVER = 1 1/2' TYP. U.N.O. 4. fr 0 28 DAYS = 6000 PSI 5. REINFORCEMENT = BAR PER ASTM A615, GRADE 60 PREPARED FOR: GRA2= PRECASTING & CONCUTE INC. 4116 BAKERVIEW SPUR BELLINGHAM, WA 98726 PHONE(3SO)671-7251 FAX(360)671-0780 1 DATE I REVISION -1 PREPARED BY. DELTA AE N G I N E E R S 184 COURT STRFM. � BINGHhjffoN, NY 13901 TEL (607) 231--SSOD PAX (607) 231-6850 6/26/07 N.T.S. "' 1' 'REINFORCING SUMMARY 1 SRO PRO= - . BANK OF WASHINGTON 14'-0" X 7'-0" 3-SIDED VAULT RS-01 2007010.017 1 OF 3� ,_,F tj % 17'-7" V-4' #806-oc F #4012"oc \�—#4@12'ocew BASE SLAB SECTION DESIGN NOTES AS PROVIDED BY EOR: 1. DESIGNEb IN ACCORDANCE WITH AASHTO 17TH EDITION FOR HS-20 LIVE LOAD. ASSUMPTIONS: BY EOR) 1. EARTH COVER = 2'-0" MAX. 2. UNIT WEIGHT OF SOIL = 120 PCF 3. BAR COVER = 1 1/2" -TYP. U.N.O. 4. fc 0 28 DAYS - 6000 PSI 5. REINFORCEMENT - BAR PER ASTM A615, GRADE 60 PREPARED FOR: 'GRAIUTE PRECASTING & CONCRETE INC. 4116 BAKERVIEW'SPUR BELLINGHAM. WA 98726 PHON�E(3 )671-2251 FAX(360)671-0780 gFv,No, DATF _I REVISION PREPARED BY: DAM. /2,/.7 SRQ iow, -- RENFORCING IUD mr SVh t.DELTA N.T.S71— SUMMARY BANK OF WASHINGTON ENGINEERS 14'-0- X 7'-0" 3—SIDED CULVERT 184 COURT gr=. BINGHAMTON. NY 139M lcaw=m- I-- — RS-01_ TEL- (807) 231-8800 FAIL- (607) Z31-6850 InWA PR� nl^ nl-Y 15M. � I nF I -1 OT L-W DESIGN NOTES AS PROVIDED BY EOR, 1. DESIGNED IN ACCORDANCE WITH AASHTO 17TH EDITION FOR HS-20 LIVE LOAD. ASSUMPnONS: (TO RF VERIFIED -BY FOR) 1. EARTH COVER = 2'—b' MAX. 2. UNIT WEIGHT OF SOIL = 120 PCF 3. BAR COVER — 1 1/2" TYP. U.N.O. 4. fe 0 2B DAYS = 6000 PSI 5. REINFORCEMENT - BAR PER ASTM A615, GRADE 60 8. #4@ 1 O"ocew #4012"ocew END WALL SECTION PREPARED BY: t,,DELTA E N G I N E E R S 184 COURT STREET. BINCHAIMN, NY 139M TEL, (607) 231-6800 PAX- (807) 231-6650 ORANUE PRECASTING & CONCUTE INC. 4116 BAKERMEW SPUR BELLINGHAM, WA 98226 PHONE(360)671-2251 FAX(360)671-0780 SRO N.T.S. BANK OF-WASHINGTON 14'-0" X 7'-0" 3-SIDED CULVERT 0.01 I PCANY, Inc. Design Output ID 0 -r Z- U Culvert Ver. 3.2 REINFORCED CONCRETE CULVERT DESIGN/ANALYSIS PROGRAM CULVERT VERSION 3.2.0 MARCH 2005 PRECAST CONCRETE ASSOCIATION OF NEW YORK, INC. DATE : 7/ 3/07 TIME : 10:27: 1 INPUT FILE NAME IS *** temp-inp OUTPUT FILE NAME IS *** temp -out REPRINT OF INPUT TITLE BANK OF WASHINGTON 14FT X 24FT X 7FT I.D. DETENTION VAULT TYPE = PC I DSN = LF FCONC = 6000 CWGT = 150 EWGT = 120 FYST = 60000 FSTL = 24000 NBOX = 1 NSPAN = 14 NHITE = 7 NFILL = 1.99 LENG = 8 CSKEW = 0 LSKEW = 90 RSKEW = 90 KBASE = P TSLAB = 10 KFXTS = F BSLAB = 0 KFXBS = V WALLR = 10 KFXW = F IWALLR = 0 KFXI = V VBOT = 0 LVLD = HS20 WHEER = 0 FILLR = 0 OFACT = 1 IMILT = NO OVERLD = 0 SURCH = YES LVOMT = YES )5-x �j 3) D 7/312007 BANK OF WASHINGTON 14FT X 24FT X 7FT I.D. DETENTION VAULT Page 1 Lo ot- Z-U PCANY, Inc. Design Output Culvert Ver.- 3.2 EDLU = 0 EDLC1 = 0 EDLX1 = 0 EDLC2 = 0 EDLX2 = 0 EDLC3 = 0 EDLX3 = 0 PRESS = 60 PMIN = 30 PWAT = NO COVS = 1.5 COVB = 1.5 COW = 1.5 CQVIN = 1.5 ISAMS = YES ISAMW = NO TFILT = 8 BFILT = 8 KRACH = YES IZOF = NO IINFN = NO DEFL = 800 END OF REPRINT 7/3/2007 BANK OF WASHINGTON 14FT X 24FT X 7FT I.D. DETENTION VAULT Page 2 PCANY, Inc. Design Output I C) I L_L/ ...:-Culvert Ver. 3.2. CULVERT VERSION 3.2.0 MARCH 2005 ORIGINAL PROGRAM BY THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS MODIFIED BY THE NEW YORK STATE DEPARTMENT OF TRANSPORTATION AND PRECAST CONCRETE ASSOCIATION OF NEW YORK, INC. TITLE BANK OF WASHINGTON 14FT X 24FT X.7FT I.D. DETENTION VAULT REG. LIVE LOAD * MILT. * SERVICE * LOAD * CULVERT INFL • CODE OMIT O-FILL OVERLD * LL. * LOAD * FACTOR * SKEW LINE HS20 YES NO 0. NO NO YES 0.0 NO • SOIL * STEEL * STEEL * CONCR * SHEAR * SHEAR * THICK INC. CONC. • WT. * FY * FS * STREN * CONCR * STIRRUP * SLAB WALL WGT. 120. 60000. 24000. 6000. 0. 0. 1.00 1.00 150. • EXTERIOR COVER * INT. * SAME THICK * BAR * BAR SPCG * BAR SIZ • T.SB B.SB WALL * COVER * SLAB WALL * TBL * MAX MIN * MAX MIN 1.50 1.50 1.50 1.50 NO NO YES 12.0 4.0 11 4 • EXTRA * EXTRA CONCENTRATED LOAD SPL. ALT. LIVE LOAD • U.LOAD * WT. X1 WT. X2 WT. X3 WHEEL FILL FACTOR 0. 0. 0.00 0. 0.00 0. 0.00 0. 0.00 1.00 • CELL * SPAN * HEIGHT * FILL * LENGTH * LSKEW * RSKEW * SUPPORT * CODE SINGLE 14.00 7.00 1.99 8.00 90.0 90.0 PIN • TOP * BOT. * EXT. * INT. * BOT. * L.LOAD * SOIL PRESS * WATER • SLAB * SLAB * WALL * WALL * VBOT * SURCHG * MAX. MIN * PRESS 10.00F G-00 10.00F 0.00 0.0 2.00 6o. 30. NO PHI HAUNCH * HAUNCHES * EDGE BEAM MOM * SHR TOP * BOT * CONSIDERED * REINFORCED 0.95 0.90 8.0 8.0 YES NO 71312007 BANK OF WASHINGTON 14FT X 24FT X 7FT I.D. DETENTION VAULT Page 3 PCANY, Inc. Design Output Culvert Ver. 3.2 TOP SLAB THICK. 10.00 BOT SLAB THICK. = 0.00 EXT. WALL THICK. 10-00 INT. WALL THICK. = 0.00 DESIGN SPAN = 14.83 DESIGN HEIGHT = 7.42 FILL = 1.99 UNFACTORED MOMENTS AND SHEARS DUE TO DEAD AND LIVE LOADS M-PT MDL MSP MWP MLL+ MLL- VDL VSP VWP VLL+ VLL- 1- 0 0.00 0.00 0.00 0.00 0.00 -0.69 1.97 0.00 0.00 -0.80 1- 1 -0.51 1.27 0.00 0.00 -0.59 -0.69 1.46 0.00 0.00 -0.80 1- 2 -1.02 2.18 0.00 0.00 -1.18 -0.69 0.99 0.00 0.00 -0-80 1- 3 -1.52 2.74 0.00 0.00 -1.77 -0.69 0.54 0.00 0.00 -0.80 1- 4 -2.03 2.99 0.00 0.00 -2.36 -0.69 0.13 0.00 0.00 -0.80 1- 5 -2.54 2.95 0.00 0.00 -2.96 -0.69 -0.25 0.00 0.00 -0.80 1- 6 -3.05 2.63 0.00 0.00 -3.55 -0.69 -0.59 0.00 0.00 -0.80 1- 7 -3.56 2.08 0.00 0.00 -4.14 -0.69 -0-90 0.00 0.00 -0.80 1- 8 -4.07 1.31 0.00 0.00 -4.73 -0.69 -1.lB' 0.00 0.00 -0-80 1- 9 -4.57 0.34 0.00 0.00 -5.32 -0.69 -1.43 0.00 0.00 -0.80 1-10 -5.08 -0-80 0.00 0.00 -5.91 -0.69 -1.64 0.00 0.00 -0-80 2- 0 -5-08 -0-80 0-00 0.00 -5.91 2.74 0.00 0.00 4.68 0.00 2- 1 -1.42 -0-80 0.00 3.55 -3.17 2.19 0.00 0.00 3.63 -0.43 2- 2 1.43 -0-80 0.00 6.31 -1.28 1.65 0.00 0.00 3.40 -0.85 2- 3 3.46 -0-80 0.00 8.29 -0.23 1.10 0.00 0.00 2.98 -1.28 2- 4 4.68 -0-80 0.00 9.47 0.00 0.55 0.00 0.00 2.55 -1.70 2- 5 5.09 -0-80 0.00 9.86 0.00 0.00 0.00 0.00 2. 13' -2.13 2- 6 4.68 -0-80 0.00 9.47 0.00 -0.55 0.00 0.00 1.70 -2.55 2- 7 3.46 -0-80 0.00 8.29 -0.23 -1-10 0.00 0.00 1.28 -2.98 2- 8 1.43 -0.80 0.00 6.31 -1.28 -1.65 0.00 0.00 0.85 -3.40 2- 9 -1.42 -0-80 0.00 3.55 -3.17 -2.19 0.00 0.00 0.43 -3.83 2-10 -5.08 -0-80 0.00 0.00 -5.91 -2.74 0.00 0.00 0.00 -4.68 713/2007 . BANK OF WASHINGTON 14FT X 24FT X 7FT I.D. DETENTION VAULT Page 4 i PCANY, Inc. Design Output 1 0 U le- w Culvert Ver. 3.2 ***** LOAD FACTOR DESIGN ***** MODULUS OF ELASTICITY OF CONCRETE (KSI) 4696. MODULAR RATIO (N) 6.18 MAXIMUM STEEL RATIO = .028 ***** THREE SIDED CULVERT ***** ATTENTION!!! FOUNDATION NOT DESIGNED BY THIS PROGRAM ENGINEER SHOULD DESIGN THE FOUNDATION *WARNING WARNING WARNING WARNING WARNING WARNING WARNING WARNING* CULVERT PROGRAM DESIGN OUTPUT REFLECTS FINAL SERVICE LOAD CONDITIONS ONLY. HANDLING, SHIPPING AND ERECTION STRESSES ARE NEITHER CHECKED NOR INCORPORATED INTO PROGRAM DESIGN AND MUST BE ANALYZED BY THE PRODUCER'S ENGINEER. EXTERNAL BRACING IS AN ACCEPTABLE METHOD TO MITIGATE OVERSTRESS AND POSSIBLE PRODUCT DAMAGE DURING THE COURSE OF HANDLING, SHIPPING AND ERECTION. *WARNING WARNING WARNING WARNING WARNING WARNING WARNING WARNING* PINNED REACTIONS - APPLIED TO STRUCTURE SERVICE LOAD VALUES (KIPS/UNIT WIDTH) REACTIONS AS SHOWN - POSITIVE >1 1< A A VERTICAL HORIZONTAL DL 3.67 0.69 SP 0.00 -1.97 WP 0.00 0.00 LL 4.68 0.80 WO/LL 3.67 -1.29 W/LL 8.35 -0.49 7/312007 BANK OF WASHINGTON. 14FT X 24FT X 7FT I.D. DETENTION VAULT Page 5 PCANY, Inc. Design Output lu OT Z_U Culvert Ver. 3.2 SERVICEABILITY CHECK BASED ON CRACK CONTROL TOP CORNER BAR BOT. CORNER BAR TSLAB(INS) Al A2 A100 FS FS(A) FS FS(A) FS FS(A) 24.80 27.36 0.00 0.00 25.58 28.15 BSLAB(INS) BSLAB(OUT) EWALL(INS) EWALL(OUT) A200 A400 B1 . B2 FS FS(A) FS FS(A) FS FS(A) FS FS(A) 0.00 0.00 0.00 0.00 0.91 23.40- 10.78 28.00 TSLAB(OUT) A300 FS FS(A) 0.00 0.00 INTWALL B3 FS FS(A) 0.00 0.00 SERVICEABILITY CHECK .BASED ON DEFLECTION LIVE LOAD DEFLECTION = 1/3905. COMPARED TO 1/800. LIMIT ***** REQUIRED BAR REINFORCEMENT TOP CORNER BAR BOT. CORNER BAR TSLAB(INS) TSLAB(OUT) Al A2 A100 A300 H V SZ SPG H V SZ SPG SZ SPG Sz SPG 57 59 5 7 0 0 0 0 6 6 4 12 BSLAB(INS) BSLAB(OUT) EWALL(INS) EWALL(OUT) INTWALL A200 A400 B1 B2 B3 Sz SPG Sz SPG Sz SPG SZ SPG SZ SPG 0 0 0 0 4 12 4 7 0 0 LONGITUDINAL BARS C1 Cloo C200 Sz SPG Sz SPG SZ SPG 4 12 4 10 0 0 713/2007 BANK OF WASHINGTON. 14FT X 24FT X 7FT I.D. DETENTION VAULT -Page 6 I I OT (-%j Design Output Culvert Ver. 3.2 PCANY, Inc. ***** OUTPUT AT CRITICAL SECTIONS ***** MEMBER NO. = 1 THICKNESS = 10-00 EXT WALL H OR HS DESIGN LOAD RATINGS MOMENT A.F.* SHR MU * MA VU * V.S.* V.A.* AS *M/V* I.R.* O.R. LT 0.9 10.5 1. 7 0.0 2.8 13.6 19 154 0.00 NC 0.0 0.0 MID 1.2 3.6 1.1 7.7 8.6 13.8 12 154 0.2D Nt 0.0 0.0 MID- -7.8 8.2 1.1 13.2 15.1 13.8 12 154 0.34 M 43.3 72.1 RT -17.6 8.2 -4.3 20.0 21.8 13.7 50 . 154 0.53 M 27.6 46.1 MEMBER NO. = 2 THICKNESS 10-00 TOP SLAB H OR HS DESIGN LOAD RATINGS MOMENT A.F.* SHR MU * MA * VU * V.S.* V.A.* AS *M/V* I.R.* O.R. LT * -15.6 4.7 11.8 20.0 21.1 13.7 137 154 0.53 V 24.2 40.4 MID 27.5 3.7 4.6 32.2 32.9 13.6 '53 154 0.88 M 25.1 41.8 RT -15.6 4.7 11.8 20.0 21.1 13.7 137 154 0.53 V 24.2 40.4 ** WEIGHT OF BARS AND VOLUME OF CONCRETE ** T.SLAB * B.SLAB * WALL * INWALL *** VOLUME *** STEEL IN IN IN IN CY/FT LB/FT 10.00 0.00 10.00 10.00 0.949 157 7/312007 BANK OF WASHINGTON 14FT X 24FT X 7FT I.D. DETENTION VAULT Page 7 PCANY, Inc. Design Output Culv6rt Ver. 3.2 ** REINFORCING STEEL BAR SCHEDULE ** LOCATION MARK * QTY * SIZE * TYPE * LENGTH * WGT * H LEG * V LEG TOP SLAB (INS) A100 16 6 STR 15- 4 367 TOP SLAB (OUT) AE300 8 4 STR 15- 4 83 CORNER (TOP) AE1 28 5 L-BAR 9- 8 285 4- 9 4-11 EXTWALL (INS) Bl 16 4 STR 7- 6 82. EXTWALL (OUT) B2 28 4 STR 7- 0 133 LONGITUD.( 1) cl 32 4 STR 7-11 172 LONGITUD.( 1) CE1 15 4 STR 7-11 81 LONGITUD.( 1) C100 17 4 STR 7-11 92 TOTAL 1295 SPLICE LENGTHS CHART MARK SIZE SPLICE LENGTH Bl 4 1- 9 Cl 4 1- 9 CE1 4 1- � Cloo 4 1- 9 713/2007 BANK OF WASHINGTON 14FT X 24FT X 7FT I.D. DETENTION VAULT Page 8 Culvert Ver.-3.2 PCANY, Inc. Design. Output ** MOMENT * AXIAL FORCE * SHEAR FOR LOAD FACTOR DESIGN AT.TENTHPOINT M-PT +MOMENT -MOMENT +A.F. -A.F. +SHEAR -SHEAR 1- 0 0.000 0.000 10.478 9.096 1.673 -1.335 1- 1 0.993 -1.115 3.566 8.174 1.011 -1.667 1- 2 1.510 -2.467 3.566 8.174 .0.391 -1.976 1- 3 1.584 -4.041 3.566 8.174 -0.185 -2.265 1- 4 1.246 -5.821 3.566 8.174 -0.719 -2.532 1- 5 0. 5Z8 -7.791 3.566 8.174 -1.050 -2.937 1- 6 -0.539 -9.935 3.566 8.174 -1.274 -3 * 385 1- 7 -1.921 -12.238 3.566 8.174 -1.477 -3.790 1- 8 -3.589 -14.682 3.566 8.174 -1.658 -4.152 1- 9 -5.509 -17.253 3.566 8.174 -1.818 -4.471 1-10 -7.128 -20.456 3.566 8.174 -1.956 -4.748 2- 0 -7.128 -20.456 1.956 4.748 13.704 3.566 2- 1 5.326 -9.758 2.578 4.592 11.148 1. 931 2- 2 15.013 -1.955 3.061 4.316 9.513 0.296 2- 3 21.932 2.950 3.406 3.643 -7.878 -1.338 2- 4 26.083 5.046 3.614 3.021 6.243 -2.973 2- 5 27.467 5.575 3.683 3.021 4.608 -4.608 2- 6 26.083 5.046 3.614 3.021 2.973 -6.243 2- 7 21.932 2.950 3.406 3.643 1.338 -7.878 2- 8 15.013 -1.955 3.061 4.316 -0.296 -9.513 2- 9 5.326 -9.758 2.578 4.592 -1.931 -11.148 2-10 -7.128 -20.456 1.956 4.748 -3.566 -13.704 713/2007 BANK OF WASHINGTON 14FT X 24FT X 7FT I.D. DETENTION VAULT Page 9 Delta Engineers, P.C. 164 Court Street Binghamton, NY 13901 (607)2311-6600 Fax (607)231-6650 Project: PRECAST SLAB DESIGN Client: Job Number File Name: Entered By: Checked By: .Date: 1 Oin 31n TECHNICAL DATA Concrete Strength r6' ksi Yield Strength ksi Equivalent Lateral Fuld Pressure:":,;'eF4�.;.!:O'�OO'kaf Unit Weight of Soil-.'. T-1,11�'.-,1�20.120 pcf Unit Weight of Concrete E Z42E+06 n 6.6 k 0.425 J 1858 K 492 Design Wheel Load r++:�,+�i,�-��;li�.,-.,'*;.'.',�'--�1:6, kips Uniform Live Load " F, t i tMi !++.,+,+'!-4!',.T-:J 0 ksf Capacity Reduction Factors: Phi - Moment Phi - Shear Load Factors: Gamma Beta - LL Beta - DL Beta - ELI�+r�.;!!!!�i-,--�,�;11,-t,�,;+'��.l�',' B'a-nkiDf,,Weishih�tdnzz-.i3i,-���,.-i.--�-;,*.r�r�.,,*..!",;�I , F I V 4-'--;x-2-M Dote- nsion.. a .. .... .... g,;!.I,;: 11" IN KN'. W 7/3/2007 Sheet:—L�L— of 0 J KIPS .4 KIPS bl= 0.75 (.85-.05.(fc-4)) fr= 581 psi Rho min 0.00333 (200/Fy) Rho max 0.02830 (.75Pb) Zmax Severe Exposure AASHTO HS20 References: 1. "Specifications for Highway Bridges, 17th Ed." - AASHTO -2. "Building Code Requirements for Structural Concrete" - ACI 318-99. 3. "Rectangular Concrete Tanks, 5th Ed."- PCA Publication. Delta Engineers, P.C. 164 Court Street Binghamton, NY 13901 (607)231-6600 Fax (607)231-6650 BASJ Unit Span Rise P-7. ft Top Slab Thickness = 31Lg**'iN0!:! 11 Wall Thickness (top) = in Wall Thickness (bot) = in Haunch a.25 in fill height PI!!"10-2 ft Number of wheels on box Slab: Thickness = in Overall Length = ft Overall Width = ft (Min. Controls) Bar cover Base Slab Area 152.42 sq. ft Project Bank of Washington. Job #- 2007.010.017 Sheet 15- Of 7-0 By: -�-RQ Date / 07 Chk By:. 5,0Z. Date 71 7/07 Used If fill is less than 4' VDL from "Culvert Ver. 2. 1" kips Calculated VLL 7.38 kips (Number Wheels * Wheel Load)/(Overall Width) Dead Loads: Walls: 1.57 kips Haunch: 0.07 kips VDL (total): 7.34 kips Live Loads: VLL (total): 7.38 kips Upward pressure: 1.27 kips Uniform Loads: WDL = 0.44 ksf WLL = 0.42 ksf Design Load: wu = 1.48 ksf M'J = 41.00 k-ft Design: A,(est) = 1.42 in2/ft Trial bar size: 1:�.i.!!ii�.-Li.-....--���'-.....-#:i81�.�-*�!..'I�,'..�E67::D A.(prov.) = 1.57 in'/ft d = 7.50 in a = 1.54 in q)Mn = 47.57 k-ft OK Reinforcement ratio: rho = 0.01745 bK Delta Engineers, P.C. 164 Court Street Binghamton, NY 13901 (607)231-6600 Fax (607)231-6650 Project: Bank of Washington Job * 2007.010.017 ZID Sheet: I & of By:'SRQ Date 7/3/20P7 Base Slab Design Conflnued: Chk By: Date _7 Check Cracking: Ma 23.75 k-ft fs 28.19 ksl OK -dc= 2.50 in A = 30.00 in' Z= 118.87 k/in OK Check Shear: VU = 11.02 kips Vc = 11.85 kips OK I Delta Engineers, P.C. 164 Court Street Binghamton, NY 13901 (607)231-6600 Fax (607)231-6650 Project: Bank of Washington Job #* 2007.010.017 Sheet: )-I Of z By: SRQ Date 7/3/2007 Chk By: Date '7/,T I / 04 L.L. Surcharge = 0.08 ksf End Slab: in Thickness Bar cover in Design Load: w,,, = 0.460 ksf wu = 0.777 ksf From PCA Case 10 b/a 2.00 Transverse Coeff Longitudinal Coeff Shear Coeff. Transverse Moment-- 2.25 kip-ft Longitudinal Moment-- 0.86 Idp-ft MU = 3.81 kip-ft Design: A,(est) = 0. 17 in'tft Amin = 0.19 in2tft Trial bar size: A.(prov.) = 0.24 in'tft d = 5.75 in a = 0.23 in q)Mn = 5.97 k-ft OK Reinforcement ratio: rho = 0.00341 OK Delta Engineers, P.C. 164 Court Street Binghamton, NY 13901 (607).231-6600 Fax (607)231-6650 Project: Bank of Washington Job #- 2007.010.017 Z() Sheet: is of By: SRQ Date 7/3 End Slab Design Continued: Chk By:. Date 0 Check Cracking: Ma = 2.24 k-ft is = 23.12 ksi OK dc= 2.25 in A= 45.00 in 2 Z = 107.77 k1in OK Check Shear: Vu = 2.50 kips q)vc = 9.09 kips OK Shear= Csx q x a 4 v Hinged Cd.qa H H CASE 10 Deflection = I I 1000D n n 9 9 3 00 e D = Et d Hinged d 12(1 _112) M N q L CATION btfi 4.0 10 2.5 2.0 1.7 . 5 1.25 1.0 0.75 0.5 Boftom edge - midpoint 0.50 0.37 0.37 OA9 0.37 0.37 0.49 - 0.48 0.37 0.37 0.48 - 0.37 OX --70.46, 0.451 0.37 --- 0.37 0.45 0.42 0.36 0.42 0.39 0.361 0.391 0.34 0.34 027 030 0.30 0.18 023 0-23 �Side edge - ma)dmum Side edge - midpolnt ITop edge - midpoint J Along Midheight (Y = 412) ble END 0.1b 0.2b 0.3b 0.4b 0.5b 0.9b 0.8b 0.7b !_, 0.6b 4.0 0- 7.00 10.60 12.10 ------ 7 12.70 12.80 3.0 0 5.50 9.10 11.10 12.00 1220 8.1 0 10.10 11.20 11.50 F 0 �04.70 3.80 . 6.70 8.70 9.80 10.10 1.75 0 3.20 5.80 7 810 9.10 ij ]EEfEE 0 2.6D .7 4.90 6.50 7.40 7.70 1.25 0 2.00 3.70 5.00 5.80 6.00 1.0 0 1.30 2.50 3.30 3.90 4.10 0.75 0 0.70 1.30 1.70 - 2.00 2.10 0.5 0 0.20 0.40, 0.501 0.6D 0.60 Along Midspan (x = b12) SOT. 0.1a 0.20 0.3a 0.48 _ 0-5a 0.6a 0.7a 0.8a 0.9a TOP 4.0 0 4.007.60 10.40 12.20 .12.80 12-20 10.40 7.60 4.00 0 U 0 3.80 7.30 9.90 11.60 11.60 9.90 73D 3.80 0 2Z 0 3.60 3! 6.80 6. 9.40 10.90 11.50 10.10 10.90 9.60 9.40 6.'20 BAD 6.00 3.60 3.20 0 0 2.0 0 1.75 0 1 2.90 2.50 5AD 4.60 7.40. 6-30 8.70 7.40 9.10 7.70 8.*70 7.40 7.40 6.30! 5.40 4.60 2.90 2.50 0 0 11.5 0 im 0 1.90 4-9D 5.70 6.00 5.70 4.90 3.60 1.90 0 1.0 0 1.30 2.50 3.30 3-90 4.10 3.90 3.30 z5o 1,30 0.75 0 0.70 1.30 1.70 ZDO 2.10 - 2.OD 1.70 , 1.30 0.70 0 LA as 0 0.20 n 40 0-50 0.60 .0-601 0.60, 0.50 0.40 G 20 0 2-59 Plate Analysis Results Or LU 2.5 Moment= Coef. x qa 2/1000 my =N D 0.1b 0.2b 0.3b I 0.4b- 0.5 0.9b 0.8b 0.7b 0.6b Top 0 0 0 0 d.-ga -0 -11 -13 1 3 12,eo'- I 11 -U.-Ba- 0 20 23 23 Z29 21 20 6.'-7a- -0 27 31 31 27 27 -U76a- -0 30 34 31 31 -Ts-a 0 32 35 33 32 0.4a 0 35 34 31 31 -6.-3a 0 ;P"-3207 31 29 27 27 0.2a 0 20 23 22 21 20 0.1a 0 11 13 12 11 11 BO-T-." 0 0. 0 --0-0 0 0 -000 M, D 0.2b I 0.3b 0,.46oOT 0.5b -- 0.8b OJ5; -0*6b TOP 0 i 0 0 0 0 0.9a 0 20 37 �4 40 41 0.8a 0 - 34 7 72 0.7a 0 4; 01 69' 8 92 94 0.6a- 0 o%7 78 10 -109 108 0.5a- 0 ;?�7748 -81 TO-0 112 0.4a 47 78 96 105 108 0.3a �000 42 69 94 0.2a 34 641 6 71 72 01 20 31 37 40 41 T. 01 0 0 0 0 01 I I �xy -9-ND 0.1b 0.2b 0.3b 0 A�b 0.5b 0.9b� O.Bb 0.7b 0 . 6b� TOP 42 27 15 71 - '0 0.9a 56 40 '26 14- 6 0 O.Ba 41 -"S4 22 5-- 0 0.1a 29 24 16 4 -2 0 T6-a -15 -13 0, U-5a 0 0 0 0 -U74 a- -15 -13 -9 - 2 0 0.3a 29 24 16 9 4 0 -411 34 22 12 0 0.1a 1 501 _ 40 2-6 14 6� r -B-OT. 1 541 42 271 15 b Mx END 0.2b 0.3b 0.4b j 0.5b Y 2.0 0.8b 0.7b 0.6b 1 -- -ro-p 0 0 0 q 0 0 �7 V7 V --T.-9-a 0 17 27 33 36 37 > Hinged 0.8a 0 28 46 57 63 65 H H 0.7a 0 34 58 74 82 85 1 1 0.6a 0 38 66 83 93 n n g 0.5a 0 39 88 86 971 (10 9 e a --F4-a 0 38 66 83 93 96 d Hinged d 0.3a 0 34 58 74 82 85 0.2a 0 28 57 - 65 t= a Z � b 0.1a 17 33 36 37 BOT. U 01 0 0 Moment= Coef. X qa 2/1 OW -0 END 0.1b 0.2b I b 0.3b 0.4b 0.5b MXY -fN-D- 0.1b 0.2.b - 0.3b 0.4b 0.5b MY 0.9b 0.8b 0. E7b ] 0.6b 0.9b 0.8-b 0.7b 0.6b 0 0 n 0 0 TOP 53 44 - 31 19 9 1' 0 TOP 0 .9 T-1 13-13- 13 -13 -09a- -49 42 - 30 IS 0j 9 0 0.9a 0.8a --0 19 23 24 23 23 0.8a 40 -28 35 -25 25 16 7- 5 5 0 0 -F-7a -0 24'- 31 --- 32 31 30 0.7j- 1 18 11 11 - 6 6 3 3 0 0.6a 0 28 36 37 36-35 -37 0.6a is 1 3 131 10 0 0 0 0.5a -0 29 37 3 8 37 0.5a 0 -15 0 g 0 6 3 3 - 0 0.4a 0 28 36 37 !2 V313 36 . 35 0.4a 28 13 1 3 25 5 10 1 125 11 .5 0 0.3a 1424 - 31 30 0.3a 35 51 1 16 7 7 0 0.2a 1 19 23 2A 24 Dq 23 0.2a 40 44,2d 30 181 9 0.1a M 01. 13 11 13 � 11 13 1 3� 3 _L 0.1! r-707T. 49 5�_ 3 44 31 19t 9 - 01 01 01 0 0 01 0 2-61 plate Analysis Results DRAINAGE REPORT FOR THE BANK OF WASHINGTON 202 - STH AVENUE SOUTH CITY OF EDMONDS SNOHOMISH COUNTY, WASHINGTON JRR # 06-67B PREPARED FOR: THE BANK OF WASHINGTON C/O GARY SCHMITT, CEO 19424-58 TH PLACE WEST LYNNWOOD, WA 98036 12- PREPARED BY: JRR ENGINEERING, INC. 18609 76TH AVENUE WEST, SUITE B LYNNWOOD, WA 98037-4149 PH. (425) 697-5108 FAX (425) 697-4506 7 �ao e 2 - 11 �0 This report has been prepared by JRR Engineering, Inc. (JRR) for Bank of Washington as support information for a commercial redevelopment within the City of Edmonds. Any revisions to the proposed project may not use or depend upon this report without the written permission of JRR. City approval will require items which are generally as follows: I . Identify existing conditions and possible development impacts 2. Show compliance with City code requirements for drainage Calculations and design plans are based on good engineering practice, City of Edmonds code requirements, methods and procedures in the Department of Ecology Stormwater Management Manual for the Puget Sound Basin (1992), and investigation of the existing system in the project area. General Site Description/Condition, The subject property (site) consists of a single lot totaling approximately 11,219 SF (.257 acres) and is located on the West side of 5th Ave. S. at Dayton Street In downtown Edmonds. Said property has a street address of 202 - 5th Ave. S., and is within the City of Edmonds, Snohomish County, Washington. A complete legal description is shown on sheet C- I of the plans. The site is bounded to the north, east and west by public right-of-way and on the south by similar commercial developments. Existing Drainage Existing drainage at and around this site consists of urban runoff. At this time there is a storm drainage system on the site to collect runoff, No wetlands have been identified on or adjacent to the site. The project is outside the floodplain and contains no shorelands. The site currently flows to the west to a closed conveyance system located in the adjacent alley. Proposed Drainage Developed runoff from the site will be routed westerly as it does in it's present condition. A decrease in impervious area is proposed. Runoff from the new buildings and the paved access and parking areas will be collected via catch basins and conveyed to a vault which will contain an outlet control tee and a 12- inch CMP discharge to the existing CB in the alley. Development Impacts The parking configuration, landscaping and drainage improvements are proposed to provide access and parking for the proposed use and improve the collection of surface water runoff on the site. No significant erosion has been observed on -site and no significant erosion is anticipated on the subject property or adjacent properties, due to the proposed development. Post development peak flows are expected to have no significant impact on existing downstream conditions. It is also the case that: (1) Modification to the existing drainage system will not cause runoff to be diverted away from the adjacent downstream property. (2) The proposed improvements are not expected to aggravate an existing drainage problem or create a new drainage problem adjacent to downstream properties. (3) A double orifice control structure is proposed for releasing runoff at pre -developed rates. (4) The proposed project conveyance system will contain and convey the 10 and I 00-year design storms. (5) The Clearing Limits that are anticipated consist of and coincide with the property lines, which will be marked prior to construction to indicate and delineate proposed improvements. Erosion/Sedimentation Control Design Silt fencing, construction entrance and typical cover techniques will be employed to minimize the potential for erosion and sedimentation. Erosion and sedimentation control details have been provided in the construction drawing submittals. Off Site Analysis: The site is generally at the same grade as the abutting properties, and is generally not affected by 11upstrearn off -site areas". Storm runoff generally is limited to that which is generated "on -site". Downstream conditions consist of a closed (pipe) drainage system draining north within the alley to Dayton Street. No significant erosion has been observed around the existing grading. No significant erosion is anticipated on the subject property due to the proposed development. Post development peak flows are expected to have no significant impact on existing downstream conditions. 2- Summary of Design Soils: Alderwood Series Hydrologic Group "C" Runoff Characteristics: Existing & Proposed C,,: 81 Second Growth Forest 86 Landscape (good condition) 98 Impervious surfaces Design Storms: 2-Year Design storm precipitation = 1.5 inches 10-Year Design storm precipitation = 2.0 inches I 00-Year Design storm precipitation = 3.0 inches Pre -Development Condition: Site Area = 11,219 SF (0.257 ac) "Meadow/Second Growth Forest" Note: Edmonds Drainage Code specifies all predeveloped conditions as "meadow" or "second -growth forest" No N sub s valuesfor meadow or second growth in DOE: Ns =. 24 2-Year Design storm peak runoff = 0.01 efs I O-Year Design storm peak runoff = 0.02 cfs 100-Year Design storm peak runoff = 0.05 cfs Post -Development Condition: Landscape Area = 828 SF (0.0 19 ac.) Impervious Area = 10,390 SF (0.23 85 ac.) 2-Year Design storm peak runoff = 0.08 cfs I O-Year Design storm peak runoff = 0. 11 cfs I 00-Year Design storm peak runoff = 0. 17 cfs Detention Required = 850 W Detention Provided = 880 W Z ; i _ke,016- -3/15107 51.73 0 CL L LU < z 270 ------------------ 6 5.1 B CNC n D WALL CENTERED ON RIDGE .272 PROPERTY LINE D < BANK OF z WASHINGTON < LC 2685 SF. F- _j Q:� > EXISTING W APARTMENT BUILDING AT w 1 ............. 2§6 62.62 5.5,3 273 6 C*4 227 __—`­CONC u3 j-4 se TRAS CAN PROPERTY LINE 1. 1 1 VL 0 o"I i I I ! 267 1 - 65.4A! 264 .0.24 ?90 C). LL EAST, 0.96 SOUTH 261 B "64.64 -------BUS STOP TOP WALL = 65.1 V-6 SHD - — — — — — — TOE WALL WEST 60.050 TYP. '0� 14 2j5 4 UP ENTRY TOWER PLANTER 4 MAX 8LOPE 1:11 TOP WALL 61.83 TOP WALL 63.93 1 0 277 -7 4 4C> 1.21/ .54,38 4 2212 58.00' DEED - UD I�R ow 39458 N89'57'40"W 244 mc v :7 — — — — — — — Fi-F\/ 60,96 112" w 7" CONCRETE WALEP'L 1. .3 251 k-7 o" w ..6 LJ u 152­ 244 243 21 .61.39 OF, r.4.4-9 .64.78 0 UD LAMP POST' ul) UD ol—NEW DRIVEWAY Cl 0 PER CITY STANDA 19 14 C 675 L /EV 6 0, "9 c' DEED Lv T 27 DETAIL, E2.26 5 44) 63?k 61.115 TRAV 4 64.79 241 242 v r �,.2e m * 54.65 co E UD Y9 af 11 —0 VAN CATCH 10 ACCESSIBLE OP COR X4 ,-71 32 uj 256 CL Lf) LL .255 2 7 246 241 Li 51. _5 54.01 S4.54 > FL:&B FL 283 61.44 FL CRO 98 r7 UD PLANTER 240 R 64� 209 2087 3 t 253 Lo 64.74 z .60. E61M FL NE 23 .3 aw J_FPHq UD 1D 64. - w4j, V, 6 E TXU D' I CURB 23 T, -'!5 4 WHEE STOP .64S6 4 f f" I vi , .519 pi ) 11 —_ lo, E) El FV 4 60-13 12" 7 Moir= w 25 .87 8" N89*57'40"W �l 7" CONCRETE WALL 122.68' CALC \TOP WALL 62.78 5- 8, 0 9 a 123,00 DEED C�, .03 1 TOP WALL 65.6 / 30, 3, 324 f�, 60.38 1/2 ROW EA BUILDING CORNER NE CORNER WALL s� 0.40 SOUTH 0.36 SOUTH, 0.66 WEST S.C.S: TYPE-lA RAINFALL DISTRIBUTION ENTER: FREQ(YEAR), DURATION(HOUR), PRECIP(INCHES) 2,24,1.5 ---------------------------------------------------------------------- S.C.S. TYPE- 1A DISTRIBUTION 2-YEAR 24-HOUR STORM 1.50" TOTAL PRECIP. ------------------ =--> --------------------------- ENTER: A(PERV), CN(PERV), A(IMPERV), CN(IMPERV), TC FOR BASIN NO. 1 .257,81,0,98,26 DATA PRINT-OUT: AREMACRES) .3 PEAK-Q(CFS) .01 PERVIOUS A CN .3 81.0 T-PEAK(HRS) 8.17 IMPERVIOUS A CN .0 98.0 VOL (CU- FT) 292 TC(MINUTES) 26.0 ENTER [d:][pathlfilename[.ext] FOR STORAGE OF COMPUTED HYDROGRAPH: BOW2PR SPECIFY:.0 - CONTINUE, N - NEWSTORM, P - PRINT, S - STOP C -.'P OS 7- ---------------------------------------------------------------------- ENTER: A(PERV), CN(PERV), A(IMPERV), CN(IMPERV), TC FOR BASIN NO. 2 .019,86,.2385,98,10 DATA PRINT-OUT: AREA(ACRES) 3 PEAK-Q(CFS) .08 PERVIOUS A CN .0 86.0 T-PEAK(HRS) 7.83 IMPERVIOUS A CN .2 98.0 VOL(CU-FT) 1141 TC(MINUTES) 10.0 ENTER (d:1[path]filename[.ext] FOR STORAGE OF COMPUTED HYDROGRAPH: BOW2PO S.C.S. TYPE-1A RAINFALL DISTRIBUTION ENTER: FREQ(YEAR), DURATION(HOUR), PRECIP(INCHES) 10,24,2 ---------------------------------------------------------------------- S.C.S. TYPE-lA DISTRIBUTION 10-YEAR 24-HOUR STORM **** 2.0011 TOTAL PRECIP. ---------------------------------------------------------------------- ENTER: A(PERV), CN(PERV), A(IMPERV), CN(IMPERV), TC FOR BASIN NO. .257,81,0,98,26 DATA PRINT-OUT: AREMACRES) PERVIOUS IMPERVIOUS TC(MINUTES) A CN A CN .3 .3 81.0 .0 98.0 26.0 PEAK-Q(CFS) T-PEAK(HRS) VOL(CU-FT) .02 8.00 562 ENTER (d:][Pathlfilename[.ext] FOR STORAGE OF COMPUTED HYDROGRAPH: BOW10PR SPECIFY: C - CONTINUE, N - NEWSTORM, P - PRINT, S - STOP ENTER [d:][pathlfilename[.ext] FOR STORAGE OF COMPUTED HYDROGRAPH: BOW10PR SPECIFY: C - CONTINUE, N - NEWSTORM, P - PRINT, S - STOP C ---------------------------------------------------------------------- ENTER: A(PERV), CN(PERV), A(IMPERV), CN(IMPERV), TC FOR BASIN NO. 2 .019,86,.2385,98,10 DATA PRINT-OUT: AREA(ACRES) PERVIOUS IMPERVIOUS TC(MINUTES) A. CN A CN .3 .0 86.0 .2 98.0 10.0 PF,AK-Q(CFS) T-PEAK(HRS) VOL(CU-FT) .11 7.83 1593 ENTER [d:1[pathlfilename[.ext1 FOR STORAGE OF COMPUTED HYDROGRAPH: BOW10PO M., S.C.S. TY�E-lA RAINFALLDISTRIBUTION ENTER:.,FREQ(YEAR), DURATION(HOUR), PRECIP(INCHES) 100,24,3 ---------------------------------------------------------------------- S.C.S. TYPE-lA DISTRIBUTION 100-YEAR 24-HOUR STORM **** 3.00" TOTAL PRECIP. ---------------------------------------------------------------------- ENTER: A(PERV), CN(PERV), A(IMPERV), CN(IMPERV), TC FOR BASIN NO. .257, 81, 0, 98, 26 DATA PRINT-OUT: AREA(ACRES) .3 PEAK-!--Q(CFS) .�0.51 PERVIOUS A . CN .3 81.0 TmPEAK(HRS) 7.�83. IMPERVIOUS A CN .0 98.0 VOL(CU-nFT) 12.18, TC(MINUTES) 26-.0 ENTER [d:1[pathl.filename[.ext1 FOR STORAGE OF COMPUTED HYDROGRAPH: BOW10.OPR S,PECIFY: C 7 CONTINUE, N - NEWSTORM, P - PRINT, S - STOP ENTER (cj:1(pathlflleflafRe(.eXt3 FOR STORAGE OF COMPUTED HYDROGRAPH: BOW100PR SPECIFY: C - CONTINUE, N - NEWSTORM, P - PRINT, S - STOP C ---------------------------------------------------------------------- ENTER: A(PERV), CN(PERV), A(IMPERV), CN(IMPERV), TC FOR BASIN NO. 2 .019,86.,.2385,98,10 DATAPRINT-OUT: AREA (ACRES) .3 PEM - Q (CF9) .17 PERVIOUS A CN 0 0 T-PEAK(HRS) 7.83 IMPERVIOUS A CN .2 98.0 VOLI(CU-FT) 2510 TC(MINUTES) RWM� (di-'Jtpathlfilename(.ext1 FOR STORAGE OF COMPUTED HYDROGRAPH!' Bowloopa SPECIFY.;:' C - CONTINU9, N - NEWSTORM, P - PRINT, S - STOP 7 SUMMARY OF INPUT ITEMS 1) TYPE OF FACILITY: TANK 2) TANK DIAMETER(ft), STORAGE DEPTH(ft): 3) VERTICAL PERMEABILITY(min/in): .00 4) PRIMARY DESIGN HYDROGRAPH FILENAME: 5) PRIMARY RELEASE RATE(cfs): .05 2.50, 2.50 F0519671 6) NUMBER OF TEST HYDROGRAPHS: 2 TEST HYD 1 FILENAME: BOW10po TARGET RELEASE(cfs): .02 TEST HYD 2 FILENAME: BOW2PO TARGET RELEASE(Cf8): .01 7) NUMBER -OF -ORIFICES, kISER-HEAD(ft), RISER-DIAM(in): 2, 2.50, 12 8) ITERATION DISPLAY: NO ENTER ITEM NUMBER TO BE REVISED (ENTER ZERO IF NO REVISIONS ARE REQUIRED): DTA.= 1.24 INCHES PERFORMANCE: __n� T�ARGET-OUTFLOW ACTUAL -OUTFLOW PK-STAGE _§3DRAGE DESIGN HYD: .17 5 .05 845 11 0 TEST HYD 1� .11 .02 1.76 630 TEST HYD 2: .08 .01 1.61 570 SPECIFY.j_ D --PeeMvMN_T, R - REVISE, A - ADJUST ORIF, E - ENLARG­E­,_--S--__W_O BOTTOM.ORIFICE: ENTER Q�MAX(cfs) .01 - DIA.= _..te jjfeNft_> -�o r VA &'A . 0 (1 -p-r- C-Oae- 'IQ-ORF" IS CHANGED TO .011 CFS IN ORDER TO MAINTAIN MIN. ORIFICE OF 0.511 TOP ORIFICE: ENTER HEIGHT(ft) 1. 65 DIA.= 1.25 INCHES PERFORMANM INFLOW TARGET -OUTFLOW ACTUAL -OUTFLOW PK-STAGE STORAGE DESIGN HYD: .17 .05 .05 2.50 --->1849 TEST HYD 1: .11 .02 .02 1.79 650 TEST HYD 2: .08 .01 .01 1.66 590 SPECIFT-F D - DOCUMENT, R - REVISE, A - ADJUST ORIF, E ENLARGE,.. S - STOP ",x /0, & 3X .3 Z-' ­54vfj� =- la-S-0 Z-.S-)( it y'sz_ go oR Z,,5 A 14 -1-7 X X'i 1950 P',A& Lit '6�-L c� R6UTING D!,TA: STAGE(FT) DISCHARGE(CFS) .00 .00 .25 .00 .50 .00 .75 .01 1.00 .01 1.25 .01 1.50 .01 1.65 .01 1.75 .02 2.00 .03 2.25 .04 2.50 .0.5 2.60 .36 2.70 .93 2.80 l..66 2.90 2.45 3.00 2.74 STORAGE(CU-FT) PERM-AREA(SQ-FT) .0 .0 44.2 .0 121.0 .0 214.5 .0 317.5 .0 425.0 .0 532.5 .0 595.1 .0 635.5 .0 728.9 .0 805.7 .0 849.9 .0 849.9 .0 849.9 .0 849.9 .0 849.9 .0 849.9 .0 AVERAGE VERTICAL PERMEABILITY: SPECIFY: F - FILE, N - NEWJOB, .0 MINUTES/INCH P - PRINT IF/OF, R - REVISE, S - STOP 9 LLI dx CD cia Ca z ad LLI LLI LIJ 4 co V*I- 0 0 z MI a; E E dip A ..... ....... .... ...... .... . .... .. . ... . .... .... ...... ... ..... ... .. ......... . . .. ......... .... .. .. ... ...... -------- -- ... ....... ..... ... . . . ....... . . ..... i ... .... .... ......... . 4 Nil . ...... .. ... th j a 46 T .. . ......... .......... .......... — ! r1ol- 'Oj ai Al- IQT A� OU Ji L lf- 4J CD lie u CUSTOMER: WILCOX PROJECT: BANK OF WASHINGTON STRUCTURE: 14'W X 24'L X. 7'H DETENTION VAULT STRUCTURAL NOTES: 1. CONCRETE STENGTH - Fc# =6,000 psi @28 Days Fc' = Recommended Stripping Strength - 3,000 psi 2. REINFORCING - ASTM-A615 GRADE 60 3. DESIGN LOAD - AASHTO HS20-44 4. DESIGN FILL - O'MIN. TO 2' 5. MATERIALS AND MANUFACTURING PER ASTM C789-95 6. REINFORCING COVER 11/2" U.N.O. 7. GROUT - 6,000 psi @56 Days, Non -Shrink Grout 8. MIN. ALLOWABLE SOIL PRESSURE - 2,000 psf GENERAL NOTES: 1. FINISH - CLASS 2 FINISH 2. INSTALLATION AND GROUTING BY OTHERS 3 . MIN. 20' CABLE LENGTH AND/ OR SPREADER BAR REQUIRED FOR LIFTING OF STRUCTURE TO BE SUPPLIED BY CONTRACTOR UPON INSTALLATION. SHEET LIST 1. COVER SHEE� GENERAL NOTES 2. PLAN, ELEVATIONS, SEC -EON 3. BASE LAYOUT 4. DETAIL: 3-SIDED PIECE-1 5. DETAIL: STD 3-SIDED PIECE-2 & 3 6. DETAIL: END BASE-1 WITH SUMP 7. DETAIL: STD BASE-2 8. DETAIL: END BASE-3 9. DETAIL: END WALLS A & B -in E)MK1rnDr`TKfr_ nTAr- UCTION, INC. 11. GROUTING DErAILS WILCOX 12. LIFTING & INSTALLA"E N CONSTR m it14000CEMM TAKM [3 MAXECORRECrx= N07M o /D 1* 13 SUBmrr SPECIFIEDRU E3 REjEcTm , THIS REVIEW DOES NOTRELIEVET14E SUBCONTRACTORiSUPF:L UER OF HIS RESPONSIBILITY FOR CORRECTNESS OF DIMEN- CONTRACT DRAWINGS OR S P_'E­CIF_1C_AT'I_0_N'S'. =RECEIVED JUL 0 9 2007 W ox co ST. c. ILCOX CONST. INC. PART LIST: 3-SIDED PIECE I 3-SIDED PIECE 2 3-SIDED PIECE 3 END BASE 1 END BASE 2 STD BASE END WALL A END WALL B HEAVY PICK: 31,,000 lbs.* *Approximate weights to be verified on scale prior to shipping 1) TOP SLABS ARE 10" THICK 2) BASE SLABS ARE 12" THICK 3) STRUCTURE HAS PIPE PENETRATIONS I EXPIR Bt251 =7'� UKANN tST: (aiA 6/)U/()z CHA DAM 6/20/07 SCALE� N.T.S. SHEM 1 MUE FOP, ENGINEERING Bank of Washington 14`W x 2WL x 71H DETENTION VAULT �'E ED AV L F � [L L- PTr 10" 7'- 1/2- 87/16' 14� 9 1/2- 9 1/2" 8 1/4" -�f. 77-7-77 iF=..- 1/4" 2' - - - : =77 6- SECTION A —A SCALE 1 64 2!7-4 3/4" T 2'-9 1/2" 4!-q 12" CP to OUTLET PIPE 'JE*1 I p_j P-2 P-3 02T ACCESS IP-1 I I 2,V'Vented I Manhole Ring & Cover 700 �B" CPEP AAVJNLET PIPE 8 T .24�- 3/4- PLAN If ;c EXPIRES 8/25/ 81 ------------ - -- -81 81 ---------- 40. 2 3/8- TYP. 8. 8- SPACE BETWEEN -7-3 - O� 3-SIDED PIECES Iv RIM: 61.65 @ ACCESS /--Ga 49!6ci Ladder T.O.S: 60.91V M1 NG: v fir r h60.07 Ol'-8" HOLE CPEP 01'CPEP------ 01'-8- HOLE - T— OUTLET'PIPE I.E: INLET PIPE 57AY lk —7 q,) 7-10 1/2" 91-10'1/2" 4� 1 6" EW-A 4�-4 1 1/2- 7- 1/2" 4%8 1/2- �EN D PIE ES ED T— ELEV: L 53.03'J4 11 L A ILA 7T A I LZ4 � I --� I - lol— — 8!-8" L L DIA. MANHOLE SUMP 3/8- TYP. 1-8 - -------------- SPACE BETWEEN BASE PIECES 2'-9 1/2"- END VIEW ELEVATION 17'-7- 8'--0- 4�-8 1/2' 3/8- 81-8.- 81 3/8' SPAC 3-SI --------------- E BETWEEN 8. DED PIECES 8'-8- 3/8" ELEVATION .*- 1. 2-7-4 314" SECTION B-B SCALE 1 / 64 L� EXPIR '/25/ =-q ES 8 ea: BASE LAYOUT 71 Lp IF� 11-6" 'TFrING INSERT P-1 SrARCON 10S X 100 (4) PLACES rfP. + -(i I 4!4' 02! HOI F 91, GROUTWAY TO BE Fnl-ED BY FILLEC 13Y CONTRACrOF DURING INSTAU.-ATnION 87/ PLAN 14! io- 3 1/4" 8 1/4" 14�-2 1/8" 7-3" .6" 87/1 ELEVATION 5. 2! :1 1 17 01--8. --J-JL- -JL- HOLE L + 4� 11" END VIEW EXPIRES 8/25/ GROUTWAY TO BE FILLED BY FILLED BY CON'TRACrOR DURING INSTALLATION \-�F`TING INSERT P-2 & 3 STARCON 10S X 10" (4) PLACES TYP. in PLAN 14!-2 118" 1 8 7/16" 8 7/16" ELEVATION 81 END VIEW DAVID ,:zi 1 XlY7 - 43372 IST /01YAk- EXPIRES 8/25/ w7 7, 1 LIM STARCC (4) FLALth i ye. 17-7" PLAN Z. 1T-10" V-1" 3- 91/21, 9 1/2" JL A GROUTWAY TO BE----, FILLED BY FILLED BY CONTRACTOR DURING INSTALLA EON ELEVATION 1. END VIEW EXPIRES 8/25/.O� 1- 3 - cl:� 17-7" 10, 1:1 W-1 � I 13'-10" 11-1�, 91/2. �q in- GROU'TWAY TO BE ---' FILLM BY FIl I ED v 13Y CONTRACTOR DURING INSTALLATION ELEVATION 1. INSERT N 10S X 10" -rVD END VIEW EXPIRES 8/251 7 - 3 - o-'/-- 17-7" 8'-8- PLAN INSERT N 10S X 10" �n t-tj rLJA%-C--3 — V-1" 11-1. ---w 9112--4 - - 13'-10" w -w 9 1/2" GROUTWAY TO BE - FILLED BY FILLED BY CONTRACTOR DURING INSTALLATION 11 13'-11" ELEVATION r 3' 7- IL A l'-3- END VIEW EXPIRES 8/25/ -�- - 3 - eq- PLAN GROUTWAY TO BE FILLED BY FILLED BY CONTRACTOR DURING INSTALLATION Y-4 1/27 END WALL, ,V-8 1/2' Ol'-8- HOLE ELEVATION INSERT N los X 10" :ES TYP. GINSEKr STAIRCON 10S X 6' (4) PLACES TYP. 4! 8. It. V-6- END VIEW %amuu I VVIKT I %J Q� FILM BY FILLED BY CONTRACTOR DURING INSTALLATION END WALL B ELEVATION —4'7Z (4) PLACES TYP. EXPIRES M51 -4a7 8. 7- 3 - 0�- END VIEW Al T-T AN 9 Ito 921 cl 7,, 6f6- Is-r- -tv— A300 cloo I 9E 04@12" O.C. _qw r-ftmo dwow V Min Lap 84-1 m 40 MR. Iw 84-1. -j I -r-1 1 02-'-09 r-(4-w 1 9 68@611 O.C. 3-Sided & Bass *bw Reinfordng Scwe: lle - 1, I J/T Clr. (Typ. U.N.O.) VV A A 0 A 43372 0 Al DI S/ONAL Bmts BAM EVIRES W251 TL� �PRECAS4�TG CC�J�j INC� 0 6/25/07 *4@12' O-C "120 O.C. 11 12 Cover 1 8 go. r H. A Inside Face #4LM 0" O.C. --=� 10"Cover fall Reinfordrig Scale. I/C - V 14W x 2411- x 7'H EP- Wilcox L) 11Z f MARK ISIZE SPACING AS PMV mr TOTAL LENGTH TYPE "vlm— A 0 Al 5 7 10-53 1Z--r 4Y T-10' A100 6 6 10-88 14�-S" STR A300 4 12 10.20 16-30 STR BI 4 12 0.20 T-7" STR cl 4 12 0.20 9'-8 a STR C100 4 10 0.24 V-8" SIR ' —r Dl 41 12 '0-20 V-C I I 2e MSUE FM ENGINMMG jCHAJO"TF: 6/25/07 H DkTF: 6/25/07 6 "=l' sKmr- Reba 1� Bank of Washington m TOP - SLAB � 3/16"X 2'X 42" GALVANIZED STRAP TYP (4) PLACES :ND WALL �A END WALL CONNECTION "-1) DETAIL N.T.S 1/2" OIA STAINLESS STEEL WEDGE ANCHOR FIELD INSTALLED PRIOR TO GROUTING 1/2" T —GROUT FILL FOAM BACKER ROD S S UPPLIED BY OTHERS 3116" X 2"X 48" STRAP TYP (4) PLACES lf2"DIA STAINLESS STEEL END WEDGE ANCHOR WALL t'D'*N\ TOP, END WALL Q� JOINT DETAIL KT.S GROUT FILL IM Iff'stm 1 1/2" EXPANDABLE FOAM IN A CAN OR BACKER ROD MAY BE USED TO GROUT EXTERIOR PRIOR TO FILLING CENTRAL CAVITY. r13'� WALL TO WALL Q9� JOINT DETAIL N.T.S [am m SUPPLIED BY OTHERS (optional to surface grout exterior of keyway before filling central cavity) (- �E WALL TO EN DWALL Qt— ) JOINT DETAIL N.T.S &CEBAS TOP -- JOINT DETAIL N.T.S OUTSIDE F WEDGE OUTSIDE OF LEG WITH HARDWOOD TO PREVENT MOVEMENT DURING INSTALLATION (MIN. TWO PER LEG) �Lj T�L �P R E C A G & CO C 2�R N RU INC,.. UgS125107 1/2- STEEI OR_/ KOROLATH SHIMS ILL BACKER ROD ZiLL LAB �4,3372 JOINT DETAIL N.T.S ST % NA EXPIRES 8/25/ =STRUCTURE DMWN Br. CHA OATE' 6/25/07 -- E -__ CHECKZD Ur. CHA OTT 6/25/07 14-VW x 24�1- x 7'H SCALF- 3/16"=I' SHEET* Gro i CUSTOMM Bank of Washington Wilcox K.A ISSUE FOR ENGINEERING 1 L"ng Lifting Hook or Shackle Load Handling Capacity to be Determined by Contractor Minimum 2U Cable Length- (4) Places Typ. Load Handling Capacity to be Determined by Contractor Starcon Clutches (4) Places Typ. 3-Sided - Piece by GPC RISE I - RUN CONTRACTOR TO MAINTAIN 2:1 RATIO OF RISE TO RUN CABLE LIFTING ANGLE. RATIO CAN BE GREATER SUCH AS 3:1, BUT NOT LESS THAN 2:1 GREATER SPANS MAY REQUIRE THE USE OF A SPREADER BAR LIFTING DIAGRAM FIG. 1 (FOR 3-SIDED SPANS UP TO 20') Locking Lifting Hook or Shackle - Load Handling Capacity to be Determined by Contractor DETAIL B 3-Sided - Piece by GPC DETAIL A itch 10 V Minimum 20'Spreader Bar Load Handling Capacity to be Determined by Contractor Minimum 20' Cable Length (4) Places Typ. Load Handling Capacity to be Determined by Contractor Starcon Clutches (4) Places Typ- RISE TO RUN RATIO OF 2:1 OR GREATER (Z OF RISE FOR EACH 1' OF RUN) Please follow the instructions outlined below to insure a smooth installation of your 3 Sided 5jidge., 1. Make sure that sub -base is prepared for installation. The bases should be placed on undisturbed soil leveled with 4 to 6 inches of pea gravel or 3/8" +/- compacted rock. Allow for soil PSI Requirements as specified per Engineering Calculations. 2. If the base is not cast in place, set footings or base stab. 3. Make sure that crane meets required maximum weight pick. Rig and set first required piece. 4. Accurate alignment of bases is critical for proper fit of 3 sided pieces. 5. Place (Korolath Shims or equal) in keyway to insure proper grouting. Center leg of 3 sided piece in keyway (from side to side). Make sure that the edge of the 3 sided piece is set flush to edge of end wall key way. See detail below. 6. Continue setting consecutive pieces. Make sure that pieces are aligned in the center of keyway. Set pieces as dose together as possible. 7. Grout 3 sided and base slab keyway, per drawing requirements. Materials Wt Lbs Vol CF.FT SSD Cement Factor Sacks im W/C Water 4.81 300 9.0 1/11 .35 Cement 4.30 8.46 6" Slump +/-1" 3/16 Max Agg Fine Agg 17.89 2990 ADMD(8.5 Lbs. INNERPLAST N (DISCLAIMER: THIS IS A GUIDELINE ONLY - FACTORS SUCH AS SAND AND AGGREGATE COULD AFFECT THE MIX - AS WELL AS TEMP. 8. Allow allotted cure time, per grout specifications, to insure required PSI. 9. Backfill and compact in 12" lifts. B) % to Inside Edge of End Wall Key Way WALL r1r_T VVMT --T LIFTING DIAGRAM FIG. 2 "i'ikD WALL DETAIL (IF APPLICABLE*) (FOR 3-SIDED SPANS GREATER THAN 20') (*FOR DETENTION VAULTS, DOES NOT APPLY TO BRIDGES & CULVERTS) �BSOH TRAFNC C0HSUL7,kHTB TRAFFIC ENGINEERING *TRANSPORTATION PLANNING 2802 WETMORE AVE. - SUITE 220 * EVERETT WA 98201 9 PH: (425) 339-8266 - FAX: (425) 258-29221 January 26, 2007 Mr. Don Sims, P.E. City of Edmonds 121 5h Avenue N Edmonds, WA 98020 Re: The Bank of WA (2,725 SF); 5th Avenue S at Dayton Street Traffic Impact Analysis, GTC #06-382 Dear Mr. Sims: Gibson Traffic Consultants (GTC) has been retained by Gary Schmitt of The Bank of WA to provide a traffic study for a proposed Bank of WA branch in the City of Edmonds. This technical memorandum is intended to supply the City of Edmonds with the necessary traffic generation and distribution information per the City's guidelines for developments that will generate more than 25 new PM peak -hour trips. This study has been organized in the same manner as the SEPA Traffic hnpact Requirements for the City of Edmonds. PROJECT DESCRIPTION The proposed Bank of WA residential development is planned to be constructed on the southwest side of 5h Avenue S at Dayton Street. A site vicinity map has been included in Figure 1. The development is proposed to consist of approximately 2,725 Square Feet (SF) of drive-in bank. Previously on the site was an 8 vehicle fueling position gas station with mini mart. The gas station was removed in June of 2006. The trips for the gas station have been credited towards the developments trips for the mitigation calculations. The gas station trips were not counted at the study intersections; therefore, the level of service analysis did not take into account credit for these trips. The development is proposed to be constructed/occupied by the end of 2007. The horizon year for this development would be the year 2012. The development is proposing to have an ingress only access point to Dayton Street,, o , ne� -) i full access onto 5'h Avenue S and access to the alley to the west. U L, "[p MAR c? 12007 COUNTS/SURVEYS - SITE IMPACTS - LOS ANALYSIS - EIS - HEARINGS - SAFETY - SIGNALS - PARKING I I I Mr. Don Sims, P.E. January 26, 2007 Page 2 METHODOLOGY Trip generation rates were obtained from the ITE Trip Generation Report, 7,h edition 2003. Land Use Code (LUC) 912, drive-in bank, and LUC 945, gas station with mini mart have been used for the trip generation calculations. Traffic congestion is generally measured in terms of level of service (LOS). Peak -hour level of service at critical off -site intersections is based on the 2000 Highway Capacity Manual (HCM) using Synchro 6. 0 percentile methodology. In accordance with the 2000 HCM, road facilities and intersections are rated between LOS A and LOS F, with LOS A being free flow and LOS F being forced flow or over -capacity conditions. A summary of the level of service criteria has been included in Table 1. The level of service at signalized and all -way stop -controlled (AWSC) intersections is measured in terms of average delay per vehicle in seconds. For two-way stop -controlled intersections, the level of service is determined -by the worst case of all the calculated lane groups at the intersection. The acceptable LOS within the City of Edmonds is LOS D. EXISTING CONDITIONS Existing Level of Service Level of service analysis was conducted at the five identified study intersections. These intersections are: 1. 5h Avenue S at Dayton Street — All -Way Stop Controlled 2. 4h Avenue S at Dayton Street — Two -Way Stop Controlled 3. 3d Avenue S at Dayton Street — All -Way Stop Controlled 4. 5 th Avenue S at Main Street — All -Way Stop Controlled 5. 5h Avenue S at Walnut Street — All -Way Stop Controlled The existing traffic counts at these intersections were obtained by Traffic Data Gathering (TDG) and were conducted in 2007. The study intersections currently operate at LOS B under the existing conditions. The intersections currently operate at an acceptable LOS. The existing level of service at the study intersections has been shown in Table 2. The existing turning movements used to determine the existing level of service have been included in Figure 2. RR'A"AF'1'V I Mr. Don Sims, P.E. January 26, 2007 Page 3 FUTURE CONDITIONS Baseline Level of Service Baseline volumes were determined by applying a 2% compounding annual growth rate to the existing traffic volumes to get to the horizon year of 2012. The growth rate is consistent with other studies in the City of Edmonds. The study intersections will continue to operate at LOS B or better with a slight increase in delay in the Baseline condition. The intersections currently operate at an acceptable LOS. The baseline level of service is summarized in Table 3. The turning movements used to determine the baseline level of service have been included in Figure 3. Future with Development Access The site currently has three curb cuts, two on 5th Avenue S and one on Dayton Street. These three curb cuts will be removed and the two new ones installed. The proposed access on 5h Avenue S would be located approximately 100 feet south of the intersection of 5th Avenue S at Dayton Street and the access to. Dayton Street would be located 56 feet to the west of the intersection. There is on -street parking and planters with trees along both 5th Avenue S and Dayton Street in the vicinity of the two site access points. This is consistent throughout the entire downtown area. . . Trip Generation Trip generation rates were obtained from the ITE Trip Generation Report, 7th Edition 2003. The following land uses were used to determine the number of trips that will be generated by the development: Land use code (LUC) 912 drive-in bank and LUC 945 gas station with mini mart. The average trip generation rates for each land use code were used to determine the trip generation. A pass -by rate of 47% was used for the drive-in bank and 56% for the gas station with mini mart. These rates are outlined in the ITE Trip Generation Handbook 2d Edition. The net new trips generated by the development with the credit for the 8 vfp gas station are anticipated to be -217 ADT with 19 PM Peak - Hour trips (9 inbound/10 outbound). A summary of the trip generation has been included in Table 4. However, for the level of service analysis the total trips generated by the bank were used to determine the actual impacts of the bank. It would be anticipated that without the credit the bank would generate 356 ADT with 66 PM peak - Hour trips (33 inbound/33 outbound). d RAFFIC IMIM OMOUL7 I Mr. Don Sims, P.E. January 26, 2007 Page 4 Trip Distribution Trip distribution for the development was based on existing turning movements at the study intersections. The trip distribution assumes that 35% of the site traffic will travel to and from south and 20% to and from the north on 5h 'Avenue S. The remaining 45% would travel on Dayton Street with 25% heading to and from the west and 20% to and from the east. The distribution of the PM peak -hour traffic without the gas station credit has been included in Figure 4A. A distribution of the net new PM peak -hour traffic with the credit for the gas station trips has been included in Figure 4B. Level of Service The future with development level of service analysis has been performed for the additional 66 PM peak -hour tips. The development turning movements at the study intersections has been included in Figure 5. The development's trips were added to the baseline turning movements to determine the future with development turning movements. The study intersections will continue to operate at LOS B. The new access to 5h Avenue S will also operate at LOS B. The future with level of service is summarized in Table 3. The future with development turning movements has been included in Figure 6. Par * 9 Per the City of Edmonds parking requirements for*the downtown business area the development will have to provide 1 parking stall for every 500 SF. The banks gross floor area is 2,725 SF; therefore, a total of 6 parking stalls would be required. According to the site plan provided there will be a total of I I parking stalls. This would be sufficient to meet the City's requirements. MITIGATION RECOMMENDATIONS Traffic mitigation payments to the City of Edmonds are based on Edmonds. Road Impact Fee Rate Study Table 4 Impact Fee Rates. However, the rate for drive-in bank has been updated to take into account the new rates in the ITE Trip Generation Report, 7 th edition 2003. Also the percent new trips were adjusted based on the new pass -by rates in the ITE' Trip Generation Handbook 2d Edition. The trips generated by the 8 vfp gas station with mini mart were credited towards the developments mitigation payment using the same mitigation fee methodology. The total required mitigation for the development would be $4,641.33. The mitigation calculations have been summarized in Table 5. RAFFIC Mr. Don Sims, P.E. January 26, 2007 Page 5 We trust that this letter and attachments adequately address the traffic impacts of the proposed commercial re -development. If you have any questions please don't hesitate to contact us at (425) 339-8266. Thanks. Sincerely, GiBsoN TRAFFIC CONSULTANTS, INC. Matthew J. Palmer, P.E. Traffic Engineer Attachments CC: Gary Schmitt, The Bank of WA aMFES 843- 69-C,6- RAFFIC (OMOUL 7 22miro Bank of WA GTC #06-382 TABLE 1 IINTERSECTION LEVEL OF SERVICE (LOS) CRITERIA Level of Service I Expected Delay Control Delay (Seconds Vehicle) Unsignalized Intersections Signalized Intersections A Little/No Delay :!�10 :!�10 B Short Delays >10 and:�15 >10 and:!�20 C Average Delays >15 and:!�25 >20 and:535 D Long Delays >25 and:!05 >35 and:555 E Very Long Delays >35 and:!�50 >55 and:!�80 F >50 >80 When demand volume exceeds the capacity of the lane, extreme delays will be encountered with queuing which may cause severe congestion affecting other traffic movements in the intersection. Source: Highway Capacity Manual 2000. LOS A: free -flow traffic conditions, with minimal delay to stopped vehicles (no vehicle is delayed longer than one cycle at signalized intersection). LOS B: generally stable traffic flow conditions. LOS C: occasional back-ups may develop, but delay to vehicles is short term and still tolerable. LOS D: during short periods of the peak hour, delays to approaching vehicles may be substantial but are tolerable during times of less demand (i.e. vehicles delayed one cycle or less at signal). LOS E: intersections operate at or near capacity, with long queues developing on all approaches and long delays. LOS F: jammed conditions on all approaches with excessively long delays and vehicles unable to move at times. RAW"A'C" (OMOUL GIBSON TRAFFIC CONSULTANTS TRAFFIC IMPACT STUDY GTC #06-382 BANK OF WA LEGEND FIGURE 1 (2,725 SF) PROJECT SITE SITE VICINITY MAP CITY OF EDMONDS 0 ## STUDY INMRSIECTIONS TRAFFIC IMPACT STUDY GIBSON TRAFFIC CONSULTANTS GTC #06-382S____j BANK OF WA LEGEND FIGURE 2 (2,725 SF) 181- PM PEAK HOUR TURNING MOVEMENT VOLUMES EYJSTING PM PEAK INTERSECTION VOLUMES CITY OF EDMONDS TRAFFIC IMPACT STUDY GIBSON TRAFFIC CONSULTANTS GTC #06-382 BANK OF WA LEGEND FIGURE 3 (2,725 SF) 200- PM PEAK HOUR TURNING MOVEMENT VOLUMES FUTURE 2012 PM PEAK WITHOUT DEVELOPMENT CITY OF EDMONDS INTERSECTION VOLUMES TRAFFIC IMPACT STUDY GIBSON TRAFFIC CONSULTANTS 2 L GTC #06-382 LEGEND FIGURE 4A BANK OF WA AWDT NEWDAUTRAFFIC (2,725 SF) PM 4 )o PEAX NEW PM PEAK HOURMPS DEVELOPMENT TRIP I TRP DlS'MBLMCt4 % DISTRIBUTION CITY OF EDMONDS (NEW PM PEAK & DAILY) TRAFFIC IMPACT STUDY GIBSON TRAFFIC CONSULTANTS 2 GTC #06-382 _j LEGEND FIGURE 413 BANK OF WA AWDT NEWDAJLYTRAFFIC (2,725 SF) PM PEAK NEW PM PEAK HOUR TRIPS DEVELOPMENT TRIP I TRIP DISTRIMMON % DISTRIBUTION CITY OF EDMONDS (NET NEW PM PEAK) I i I I P-1 I I I I I I I I I GIBSON TRAFFIC CONSULTANTS TRAFFIC IMPACT STU GTC #06-382 BANK OF WA LEGEND FIGURE 5 (2,725 SF) 7- PM PEAX HOUR DEVELOPMENT TURNING MOVEMEW VOLUMES INTERSECTION VOLUMES CITY OF EDMONDS (NEW TRIPS) I I v I 11 I I I I I I I I I I TRAFFIC IMPACT STU GIBSON TRAFFIC CONSULTANTS GTC #06-382 BANK OF WA LEGEND FIGURE 6 (2,725 SF) 207- PM PEAK HOUR TURNING MOVEMEW VOLUMES FUTURE 2012 PM PEAK WITH DEVELOPMENT CITY OF EDMONDS INTERSECTION VOLUMES I I I I I F r--1 L 11 I I I I I I I Bank of WA GTC #06-382 TABLE2 EXISTING LEVEL OF SERVICE Weekday PM Peak Hour EXISTING INTERSECTION CONDITIONS LOS Delay 1 . 5th Avenue S @ B 12.0 sec Dayton Street 2. 4th Avenue S @ B 12.2 sec Dayton Street 3. 3rd Avenue S @ B 10.7 sec Dayton Street 4. 5th Avenue S @ B 10.8 sec Main Street 5. 5th Avenue S @ B 12.4 sec Walnut Street RAN"Al'C" (OMOUL Ir 1HY0 I I I I I I I I 11 F1 I Bank of WA GTC #06-382 TABLE3 FUTURE LEVEL OF SERVICE Weekday PM Peak Hour EXISTING FUTURE 2012 CONDITIONS' With ut Project With Project INTERSECTION CONDITIONS LOS Delay LOS Delay LOS Delay 1. 5th Avenue S @ B 12.0 see B 13.5 see B 15.0 see Dayton Street 2. 4th Avenue S @ B 12.2 see B 12.8 see B 13.1 see Dayton Street 3. 3rd Avenue S @ B 10.7 see B 11.6 see B 11.8 see Dayton Street 4. 5th Avenue S @ B 10.8 see B 11. 8 see B 12.0 see Main Street .5. 5th Avenue S B 12.4 see B 14.2 see B 14.7 see Walnut Street 6. 5th Avenue S @ B 14.5 see Full Access 1. 1 Includes 2% annually compounded growth rate. I 171 I I G- 080(OH CRAFFIC OHOULYANTO I I 11 I I I I I i I I I *' I I I I I 11 Bank of WA GTC #06-382 TABLE4 TRIP GENERATION SUMMARY Proposed Land Use SIZE Average Daily Trips PM Peak -Hour Total Inbound Outbound Drive -In Bank 2,725 SF 671.69 125 63 62 Gas Station w/ Mini Mart -8 VFP -1302.24 -107 -54 -53 GROSSTOTAL ................. -631 18 9 9 PASS -BY Reduction .............. ..... X 7 : 7 : 7 7 : 7 : 7 : 7 : 7 414 1 0 1 NET NEW TOTAL -217 19 9 10 RR'ZF'F'('1C"' (OMOUL M M M M M � M M M "on"= ='M MIM M M = Bank of WA GTC #06-382 TABLE 5 MITIGATION SUMMARY ITE Code ITE Land Use Category Trip Rate Trip Length Factor % New Trips Net New Trips per Unit Impact Fee per Unit unit Total 912 Drive-in Bank 45.74 0.47 53% 11.39 $ 8,698.09 2.725 $23,702.29 945 Gas Station w/ Mini Mart. 13.38 0.53 44% 3.12 $ 2,382.62 -8 -$19,060. 5 Total 1 $ 4,641.33 I Excludes pass -by trips per the June 2004 Trip Generation Handbook. aR'A"F0F('1'CM (OM8 UL 7 a a IM70 Bank of WA GTC #06-382 IBank New Trips I A I I I I I I I I I I I I I New Trip Distribution % & Associated Trip Assignments (raw values not corrected for rounding error) PM Version - New Trips New ADT I New PM Peak % I In I Out I 100% 3561 331 33 AHourTfips 66 11% 3.56 0.33 0.33 0.66 2% 7.12 0.66 0.66 1.32 3% 10.68 0.99 0.99 1.98 4% 14.24 1.32 1.32 2.64 5% 17.80 1.65 1.65 3.30 6%1 21.36 1.981 1.98 3.96 7% 24.92 2.31 2.31 4.62 8% 28.48 2.64 2.64 5.28 9% 32.04 2.97 2.97 5.94 10% 35.60 3.30 3.30 6.60 11% 39.16 3.63 3.63 7.26 12% 42.72 3.96 3.96 7.92 13% 46.28 4.29 4.29 8.58 14% 49.84 4.62 4.62 9.24 15% 53.40 4.95 4.95 9.90 16% 56.96 5.28 5.28 10.56 17%1 60.52 5.611 5.61 11.22 18% 64.08 5.94 5.94 11.88 19% 67.64 6.27 6.27 12.54 20% 71.20 6.60 6.60 13.20 21% 74.76 6.93 6.93 13.86 22% 78.32 7.26 7.26 14.52 23% 81.88 7.59 7.59 15.18 24% 85.44 7.92 7.92 15.84 25% 89.00 8.25 8.25 16.50 26% 92.56 8.58 8.58 17.16 27% 96.12 8.91 8.91 17.82 28%1 99.68 9.241 9.24 18.48 29% 103.24 9.57 9.57 19.14 30% 106.80 9.90 9.90 19.80 31% 110.36 10.23 10.23 20.46 32% 113.92 10.56 10.56 21.12 33% 117.48 10.89 10.89 21.78 34% 121.04 11.221 11.22 22.44 35% 124.60 11.55 11.55 23.10 36% 128.16 11.88 11.88 23.76 37% 131.72 12.21 12.21 24.42 38% 135.28 12.54 12.54 25.08 39%1 138.84 12.87 12.87 25.74 40% 142.40 13.20 13.20 26.40 41% 145.96 13.53 13.53 27.06 42% 149.52 13.86 13.86 27.72 43% 153.08 14.19 14.19 28.38 44% 156.641 14.52 14.52 29.04 45% 160.201 14.85 14.85 29.70 46% 163.76 15.18 15.18 30.36 47% 167.32 15.51 15.51 31.02 48% 170.88 15.84 15.84 31.68 490% 174.44 16.17 16.17 32.34 178.00 16.501 16.50 33.00 New New PM Peak Hour Trips r-./.--FADT In I Out 11 Total 100%1 3561 331 3311 66 51% 181.56 16.83 16.83 33.66 52% 185.12 17.16 17.16 34.32 53% 188.68 17.49 17.49 34.98 54% 192.24 17.82 17.82 35.64 55% 195.80 18.15 18.15 36.30 56%1 199.36 18.481 18.48 36.96 570/61 202.92 18.81 18.81 37.62 58% 206.48 19.14 19.14 38.28 59% 210.04 19.47 19.47 38.94 60% 213.60 19.80 19.80 39.60 61% 217.16 20.13 20.131 40.26 62%, 220.72 20.46 20.46 40.92 63% 224.28 20.79 20.79 41.58 64% 227.84 21.12 21.12 42.24 65% 231.40 21.45 21.45 42.90 66% 234.96 21.78 21.78 43.56 67%, 238.52 22.11 22.11 44.22 68% 242.08 22.44 22.44 44.88 69% 245.64 22.77 22.77 45.54 70% 249.20 23.10 23.10 46.20 71% 252.76 23.43 23.43 46.86 72% 256.321 23.76 23.76 47.52 73% 259.88 24.09 24.09 48.18 74% 263.44 24.42 24.42 48.84 75% 267.00 24.75 24.75 49.50 76% 270.56 25.08 25.08 50.16 77% 274.12 25.41 25.41 50.82 78% 277.68 25.74 25.74 51.48 79% 281.24 26.07 26.07 52.14 80% 284.80 26.40 26.40 52.80 81% 288.36 26.73 26.73 53.46 82% 291.92 27.06 27.06 54.12 83% 295.48 27.39 27.39 54.78 84% 299.04 27.72 27.72 55.44 85% 302.60 28.05 28.05 56.10 86% 306.16 28.38 28.38 56.76 87%1 309.72 28.71 28.71 57.42 88% 313.28 29.04 29.04 58.08 89% 316.84 29.37 29.37 58.74 90% 320.40 29.70 29.70 59.40 91% 323.96 30.03 30.03 60.06 92%, 327.52 30.36 30.36 60.72 93%1 331.08 30.69 30.69 61.38 94% 334.64 31.02 31.02 62.04 95% 338.20 31.35 31.35 62.70 96% 341.76 31.68 31.68 63.36 97% 345.32 32.01 32.0111 64.02 989/al 348.881 32.34 32.34 64.68 99%1 352.441 32.67 32.67 65.34 100014 356.001 33.00 33.00 66.00 I I Bank of WA GTC #06-382 I I I I I I I I IF I I I I I Bank Net New Trips New Trip Distribution % & Associated Trip Assignments (raw values not corrected for rounding error) PM Version - Net New Trios New ADT New PM Peak Hour Trips % i-l- In I Eu:t=Total 100% 3 -6311 91 1011 19 l % -6.31 0.09 0.10 0.19 2% -12.61 0.18 0.20 0.38 3% -18.92 0.27 0.30 0.57 4% -25.22 0.36 0.40 0.76 5% -31.53 0.45 0.50 0.95 6%1 -37.83 0.541 0.60 1.14 7% -44.14 0.63 0.70 1.33 8% -50.44 0.72 0.80 1.52 9% -56.75 0.81 0.90 1.71 10% -63.06 0.90 TOO 1.95 11% -69.36 0.99 1.10 2.09 12% -75.67 1.08 1.20 2.28 13% -81.97 1.17 1.30 2.47 14% -88.28 1.26 .1.40 2.66 15% -94.58 1.35 1.50 2.85 16% -100.89 1.44 1.60 3.04 17%1 -107.19 1.531 1.70 3.23 18% -113.50 1.62 1.80 3.42 19% -119.80 1.71 1.90 3.61 20% -126.11 1.80 2.00 3.80 21% -132.42 1.89 2.10 3.99 22% -138.72 1.98 2.20 4.18 23% -145.03 2.07 2.30 4.37 24% -151.33 2.16 2.40 4.56 25% -157.64 2.25 2.50 4.75 26% -163.94 2.34 2.60 4.94 27% -170.25 2.43 2.70 5.13 28%1 -176.55 2.52 2.80 5.32 29% -182.86 2.61 2.90 5.51 30% -189.17 2.70 3.00 5.70 31% -195.47 2.79 3.10 5.89 32% -201.78 2.88 3.20 6.08 33% -208.08 2.971 3.30 6.27 34% -214.39 3.061 3.40 6.46 35% -220.69 3.15 3.50 6.65 36% -227.00 3.24 3.60 6.84 37% -233.30 3.33 3.70 7.03 38% -239.61 3.42 3.80 7.22 39% -245.911 3.51 3.90 7.41 40% -252.221 3.60 4.00 7.60 41% -258.531 3.69 0 7.79 42% -264.831 3.78 _4.1 4.20 7.98 43% -271.14 3.87 4.30 8.17 44% -277.44 3.96 4.40 8.36 45% -283.75 4.05 4.50 8.55 46% -290.05 4.14 4.60 8.74 47%1 -296.36 4.23 4.70 8.93 48% 0 -302.661 4.32 4.80 9.12 49% 0 -308.971 4.41 4.90 9.31 500/1 -315.281 4.501 5*00 New ADT New PM Peak Hour Trips 1-0/6 d In Out 11 Total 100%1 -6311 91 13 7 19 51% -321.58 4.59 5.10 9.69 52% -327.89 4.68 5.20 9.88 53% -334.19 4.77 5.30 10.07 54% -340.50 4.86 5.40 10.26 55% -346.80 4.95 5.50 10.45 56%1 -353.11 5.041 5.60 10.64 57%1 -359.41 5.131 5.70 10.83 58% -365.72 5.22 5.80 11.02 59% -372.02 5.31 5.90 11.21 60% -378.33 5.40 6.00 11.40 61% -384.64 5.49 6.10 11.59 62% -390.94 5.58 6.20 11.78 63%1 -397.25 5.671 6.30 11.97 64% -403.55 5.76 6.40 12.16 65% -409.86 5.85 6.50 12.35 66% -416.16 5.94 6.60 12.54 67% -422.47 6.03 6.70 12.73 68% -428.77 6.12 6.80 12.92 69%1 -435.08 6.211 6.90 13.11 70% -441.39 6.30 7.00 13.30 71% -447.69 6.39 7.10 13.49 72% -454.00 6.48 7.20 13.68 73% -460.30 6.57 7.30 13.87 74%. -466.61 6.66 7.40 14.06 75% -472.91 6.751 7.50 14.25 76% -479.22 6.84 7.601 14.44 77% -485.52 6.93 7.70 14.63 78% -491.83 7.02 7.80 14.82 79% -498.13 7.11 7.90 15.01 800/4 -504.44 7.20 8.00 15.20 81% -510.75 7.291 8.10 15.39 82% -517.05 7.38 8.20 15.58 83% -523.36 7.47 8.30 15.77 84% -529.66 7.56 8.40 15.96 85% -535.97 7.65 8.50 16.15 86% -542.27 7.74 8.60 16.34 87% -548.58 7.83 8.701 16.53 88% -554.88 7.92 8.80 16.72 89% -561.19 8.01 8.90 16.91 90% -567.50 8.10 9.00 17.10 91% -573.80 8.19 9.10 17.29 92% -580.11 8.28 9.20 17.48 93% -586.41 8.37 9.301 17.67 94% -592.72 8.46 9.40 17.86 95% -599.02 8.55 9.50 18.05 96% -605.33 8.64 9.60 18.24 97% -611.63 8.73 9.70 18.43 98% -617.94 8.82 9.801 18. 99% -624.24 8.91 9.90 18.81 1 100 -630.55 9.001 10.001 1900, I Bank of WA GTC #06-382 IBank Pass -by Trips New Trip Distribution % & Associated Trip Assignments (raw values not corrected for rounding error) PM Version - Pass -by I rips New ADT New PM Peak Hour Trips % In I Ou L�291 Total 100%1 3161 301 59 1 % 3.16 0.30 0.29 0.59 2% 6.31 0.60 0.58 1.18 3% 9.47 0.90 0.87 1.77 4% 12.63 1.20 1.16 2.36 5% 15.78 1.50 1.45 2.95 6% 18.941 1.80 1.74 3.54 7% 22.10 2.10 2.03 4.13 8% 25.26 2.40 2.32 4.72 9% 28.41 2.70 2.61 5.31 10% 31.57 3.00 2.90 5.90 11% 34.73 3.30 3.19 6.49 12% 37.881 3.60 3.48 7.08 13% 41.041 3.90 3.77 7.67 14% 44.20 4.20 4.06 8.26 15% 47.35 4.50 4.35 8.85 16% 50.51 4.80 4.64 9.44 17% 53.67 5.10 4.93 10.03 18% 56.82 5.40 5.22 10.62 19% 59.98 5.70 5.51 11.21 20% 63.14 6.00 5.80 11.80 21% 66.29 6.30 6.09 12.39 22% 69.45 6.60 6.38 12.98 23% 72.61 6.90 6.67 13.57 24% 75.77 7.20 6.96 14.16 25% 78.92 7.50 7.25 14.75 26% 82.08 7.80 7.54 15.34 27% 85.24 8.10 7.83 15.93 28% 88.39 8.40 8.12 16.52 29% 91.55 8.70 8.41 17.11 30% 94.71 9.00 8.70 17.70 31% 97.86 9.30 8.99 18.29 32% 101.02 9.60 9.28 18.88 33% 104.18 9.90 9.57 19.47 34% 107.33 10.20 9.86 20.06 35% 110.49 10.50 10.15 20.65 36% 113.65 10.80 10.44 21.24 37% 116.81 11.10 10.73 21.83 38% 119.96 11.40 11.02 22.42 39% 123.12 11.70 11.31 23.01 40% 126.28 12.00 11.60 23.60 41% 129.43 12.30 11.89 24.19 42% 132.59 12.60 12.18 24.78 43% 135.75 12.90 12.47 25.37 44% 138.901 13.20 12.76 25.96 45% 142.061 13.50 13.05 26.55 46% 145.221 13.80 13.34 27.14 47% 148.371 14.10 13.63 27.73 48% 151.53 14.40 13.92 2832 490X 154.69 14.70 14.21 157.851 15.00 14 40 New ADT New PM Peak Hour Trips % In I Out I Total 100014 3161 301 2911 59 51%1 161.00 15.30 14.79 30.09 52% 164.16 15.60 15.08 30.68 53% 167.32 15.90 15.37 31.27 54% 170.47 16.20 15.66 31.86 55% 173.63 16.50 15.95 32.45 56% 176.79 16.801 16.24 33.04 57%1 179.94 17.10 16.53 33.63 58%1 183.10 17.40 16.82 34.22 59% 186.26 17.70 17.11 34.81 60% 189.41 18.00 17.40 35.40 61% 192.57 18.30 17.69 35.99 62% 195.73 18.601 17.98 36.58 63% 198.88 18.90 18.27 37.17 64% 202.04 19.20 18.56 37.76 65% 205.20 19.50 18.85 38.35 66% 208.36 19.80 19.14 38.94 67% 211.51 20.10 19.43 39.53 68% 214.67 20.401 19.72 40.12 69% 217.83 20.70 20.01 40.71 70% 220.98 21.00 20.30 41.30 71% 224.14 21.30 20.59 41.89 72% 227.30 21.60 20.88 42.48 73% 230.45 21.90 21.17 43.07 74% 233.61 22.20 21.46 43.66 75% 236.77 22.50 21.75 44.25 76% 239.92 22.80 22.04 44.84 77% 243.08 23.10 22.33 45.43 78% 246.24 23.40 22.62 46.02 79% 249.40 23.70 22.91 46.61 80% 252.55 24.00 23.20 47.20 81% 255.71 24.30 23.49 47.79 82% 258.87 24.60 23.78 48.38 83% 262.02 24.90 24.07 48.97 84% 265.18 25.20 24.36 49.56 85% 268.34 25.50 24.65 50.15 86% 271.49 25.80 24.94 50.74 87% 274.65 26.10 25.23 51.33 88% 277.81 26.40 25.52 51.92 89% 280.96 26.70, 25.81 52.51 90% 284.12 27.00 26.10 53.10 91% 287.28 27.30 26.39 53.69 92% 290.43 27.60 26.68 54.28 93% 293.59 27.90 26.97 54.87 940/61 296.75 28.20 27.26 55.46 95% 299.91 28.50 27.55 56.05 96% 303.06 28.80 27.84 56.64 97% 306.22 29.10 28.13 5723 98% 309.38 29.40 28.42 99% 312.531 29.70 28.71 1 1000/4 315.691 30.00 29.00 5 m m m m w m � m m m m m m m = m = m m JEYA Bank of WA GTC #06-382 Trip Generation for: Weekday (a.k.a.): Average Weekday Daily Trips (AWDT) NET EXTERNAL TRIPS BY TYPE IN BOTH DIRECTIONS DIRECTI, DIRECTIONAL ASSIGNMENTS TOTAL PASS -BY DIVERTED NEW N PASS -BY DIVERTED NEW Gross Trips Internal Crossover LINK LINK LAND USES VARIABLE ITE LU Trip % % ln+Out % of Gross Trips In+Out ln+Out % of Ext. In+Out % of Ext ' In+Out I In+Out t In E-207 Out In Out In Out code Rate IN OUT (Total) Trips (Total) (Total) Trips N (Total) Trips (Total) I (Total) ) Drive-in Bank 2.725 ksqft 912 246.49 50% 50% 671.69 0% 0 672 477 316 0% 0 6 1581 0 0 178 178 ,Gas Station wl Mini Mart -8 vfp 945 162.78 50% , 50% -1302.24, 0% 0 -1302 56% -729 0% 0 j -575 -365 -365 0 0 -287 -286 ITotals -630.55 r/ 0 1 -631 — .7-14— E!O -217 -207 1 0 1 0 1-109 -1081 = m m m m m m m m = = m m m = = = = m C Bank of WA GTC #06-382 Trip Generation for: Weekday, Peak Hour of Adjacent Street Traffic, One Hour between 4 and 6 PM (a.k.a.): Weekday PM Peak Hour NET EXTERNAL TRIPS BY TYPE IN BOTH DIRECTIONS DIRECTIONAL ASSIGNMENTS TOTAL PASS -BY DIVERTED N W NEW PASS -BY DIVERTED NEW Gross Trips Internal Crossover LINK LINK LAND USES VARIABLE ITE LU Trip % % In+Out % of Gross Trips In+Out In+Out % of Ext " I In+Out % of Ext In+Out In+Out 0 ]E In Out In Out I In Out code Rate IN OUT (Total) Trips (Total) (Total) Trips (Total) I * Trips (Total) I (Total) (T I I Drive-in Bank 2.725 ksqft 912 45.74 50% 56-7/6 125 0% 0 125 467% 0;6 59 11-07 0 1-66 30 29 1 0 0 33 33 Gas Station w/ Mini Mart -8 vfp 945 , 13.38 50%,50% -107 , 0% 0 -107 5 569% -60 0 — 47 -30 - 0 3 0 0 — -24 -23J ITotals 18 0 1 8 JE 0 11 1 9 19 0.1 -1 0 1 o if 9 1 3 1 5th Ave S @ Dayton St Page I of 12 I I I F1 I I I I I I 11 I I I I I Synchro ID: I Existing 182 416 234 Average Weekday 20 1 152 10 PM Peak Hour 5th Ave S 6 Year: 1/23/07 208 43 1 3 ff33 172 t'2�' Data Source: TDG 464 Dayton St F90, I Dayton St 352 North 27 ZI 256 135 180 9*4 5th Ave S a 75 181 35 570 291 F Future without Project 201 460 259 Average Weekday 22 168 11 PM Peak Hour 0 11 Ib 5th Ave S "'9 Year: 2012 230 4:2 190 Growth Rate 2.0% 0 Years of Growth = 5 513 Dayton St F9967 Dayton St 389- North Total Growth = 1.1041 283 149 c* 199 104 �b 5th Ave S 11 83 200 9 308 1 630 J_ 322 F Total Project T * rips E-7 1 14 7 Average Weekday 3 1 4 0 PM Peak Hour 0 4 5th Ave S g�' 0 20 4:3 ff5 7 0 2 20 Dayton St Dayton St 14 North 0 P 0 0 7 0 5th Ave S la 12 7 7 32 26 Future with Project 208 474 266 Average Weekday 27 170 11 PM Peak Hour 0 4 5th Ave S I:s 29 256 4-- 128 E40 197 t2 539 Dayton St E� Dayton St 410 North 30 0 283 149 * 213 L 104 4�s 5th Ave S 9;� 1� 101 20 314 675 1 361 I rp I 1 5th Ave S @ Dayton St Page 2 of 12 I I I I I I I I I I I I I 11 I I Total Pipeline Project Trips Average Weekday 0 1 0 0 0 1 0 0 PM Peak Hour 0 IZI 5th Ave S 0 0 0 0 0 0 0 Dayton St Dayton St 0 North 0 0 0 0 5th Ave S 0 0 0 0 F___o 0 0 F Pass -By Project Trips Average Weekday 0 0 0 2 1 -2 0 PM Peak Hour 0 lb 5th Ave S 0 6 -2 0 0 2 6 Dayton St Dayton St 7 North 0 0 7 0 5th Ave S 6 0 0 1 ::qF 1 13 1 13 I 2 4th Ave S @ Dayton St Page 3 of 12 Synchro ID: 2 Existing E-41 102 61 Average Weekday 15 1 9 17 PM Peak Hour 4th Ave S 31 Year: 11/23/07 178 155 193 g7 0 Data Source: TDG 393 Dayton St ---J F476 Dayton St 404 North 211 4th Ave S I 8 10 1 9 53 1 27 Future without Project F-46 113 67 Average Weekday 17 1 10 19 PM Peak Hour 0 4th Ave S 9;� 34 Year 2012 197 0 ff17 1 213 Growth Rate � 2.0% 0 8 Years of Growth = 5 434 Dayton St F526 Dayton St 446 North Total Growth = 1.1041 C* 233 4th Ave S a 9 11 1 10 r-29 59 1 30 Total Project Trips F-�O 1 0 0 LI Average Weekday 0 1 0 0 PM Peak Hour 0 4th Ave S 1�'ff7 7 43 0 1 14 Dayton St Dayton St 16 North 8 4th Ave S 0 0 1 2 1 1 I — Future with Project [-46 113 67 :J Average Weekday 17 1 10 19 PM Peak Hour 0 G 'Ib 4th Ave S "> 4 204 E78 221 9 448 Dayton St F��72 Dayton St 462 North 241 4th Ave S 9 la 11 1 11 F-36 61 1 31 —1 I 2 4th Ave S @ Dayton St Page 4 of 12 I I I I I I I I I I I I I I I I I Total Pipeline Project Trips Average Weekday 0 1 0 0 0 1 0 0 PM Peak Hour 0 4 lb 4th Ave S R> 0 0 C3 0 0 Dayton St Dayton St 0 0 North 0 0 0 0 0 0 4th Ave S 0 la 0 0 0 0 0 Pass -By Project Trips Average Weekday 0 0 0 0 0 0 PM Peak Hour 4 4th Ave S 0 0 0 0 Dayton St Dayton St 0 0 0 North 0 0 0 0 0 4th Ave S 0 I 0 1 2d F-O 0 1 0 I I I 3 3rd Ave S @ Dayton St Page 5 of 12 I I I I F1 I I I I I I I I I 11 I I Synchro ID: 3 Existing 198 391 193 Average Weekday 55 1 88 55 PM Peak Hour 0 1�3 3rd Ave S lz� Year: 1/23107 209 4,3 E43 113 171 t2 15 Data Source: TDG 404 Dayton St F709 Dayton St 366 North 195 113 195 9 4b 3rd Ave S 41 77 112 257 145 Future without Project 219 432 213 Average Weekday 61 97 61 PM Peak Hour 4 1�1 3rd Ave S q' 7 Year 2012 231 4c= ff25 189 Growth Rate = 2.0% Z2 1 7 Years of Growth = 5 447 Dayton St F784 Dayton St 405 North Total Growth = 1.1041 216 125 c* 216 10 3rd Ave S 45 124 284 1 160 Total Project Trips 2 1 4 2 Average Weekday 0 1 0 2 PM Peak Hour t2 4 3rd Ave S R> 2 4 E4 7 8 Dayton St Dayton St 14 North 4 4 c* 7 0 3rd Ave S 1� 0 0 2 1 1 Future with Project 221 1 436 215 Average Weekday 61 1 97 1 63 PM Peak Hour 3rd Ave S R> 49 235 ��3 ff129 196 t2 18 455 Dayton St F-798 Dayton St 419 North 220 129 223 10 3rd Ave S la 45 85 1 31 f-125 286 1 161 I 10 I 3 3rd Ave S @ Dayton St Page 6 of 12 I I I I I I I I I I I I I 11 I I I Total Pipeline Project Trips 0 1 0 0 _J Average Weekday 0 1 0 0 PM Peak Hour L? <Z3 3rd Ave S 0 0 0 0 0 0 0 Dayton St Dayton St 0 North 0 C* 0 0 3rd Ave S ID 0 0 1 0 0 0 0 Pass -By Project Trips 0 0 0 Average Weekday 0 1 0 0 PM Peak Hour 60 3rd Ave S 0 0 *3 0 0 0 0 0 Dayton St Dayton St 0 North 0 �p I 0 0 C* 0 0 3rd Ave S 0 0 1 0 0 0 1 0 I I 4 5th Ave S @ Main St Page 7 of 12 I I I I I I I I I I I I I I r I I Synchro ID: 4 Existing 167 91 Average Weekday 15 PM Peak Hour lb 5th Ave S 4 Year: 1/23/07 265 59 ff3 218 5 Data Source: TDG 518 Main St F�-J Main St 440 North 15 0 253 120 c* 1,b 222 118 5th Ave S 78 52 87 186 403 217 Future without Project E-84 184 100 Average Weekday 31 1 36 17 PM Peak Hour 0 4 t 5th Ave S R� 26 Year: 2012 293 1:3 176 ff39 241 Growth Rate = 2.0% t2 Years of Growth = 5 572 Main St ---J F843 Main St 486 North Total Growth = 1.1041 245 5th Ave S la 86 57 96 F-205 444 239 Total Project Trips [-2 4 2 Average Weekday 0 1 2 0 PM Peak Hour 0 IZ3 5th Ave S g:� 0 3 EO 2 2 6 Main St Main St 4 North 2 5th Ave S la 3 2 14 7 Future with Project E-86 188 102 Average Weekday 31 1 38 17 PM Peak Hour 4 <b 5th Ave S 26 296 4--3 176 E41 243 t2 1 578 Main St -- F857� Main St 490 North 247 5th Ave S 89 59 r-212 458 1 246 F I Jz I 4 5th Ave S @ Main St Page 8 of 12 I I I I I I I I I I I I I I I I Total Pipeline Project Trips 0 1 0 0 _J Average Weekday 0 1 0 0 PM Peak Hour 0 1�3 5th Ave S gz> 0 0 *3 0 0 0 0 0 Main St Main St 0 No rth 0 0 C* 0 0 5th Ave S 0 0 1 0 F 0 1 0 Pass -By Project Trips Average Weekday PM Peak Hour 0 0 0 0 1 0 0 5th Ave S 0 0 4:3 0 0 ff t? 0 f 0 St Main St I 0 North 0 0 0 0 5th Ave S 0 0 0 1 0 1 13 5 5th Ave S @ Walnut St Page 9 of 12 Synchro ID: 5 Existing 280 596 316 Average Weekday 12 1 248 20 PM Peak Hour 0 4 <�, 5th Ave S 't'2' 23 Year: 1/23/07 96 51 114 E4 0 Data Source: TDG 198 Walnut St Walnut St 208 13 102 37 94 52 5th Ave S 33 280 340 690 1 350 Future without Project 309 1 657 348 Average Weekday 13 1 274 22 PM Peak Hour 4 lb 5th Ave S 25 'ti Year: 2012 105 56 125 E44 Growth Rate 2.0% Years of Growth = 5 217 Walnut St F 932-1 Walnut St 229 Total Growth = 1.1041 112 41 104 57 5th Ave S I la 36 309 375 761 1 386 Total Project Trips Average Weekday PM Peak Hour I 'I Future with Project Average Weekday PM Peak Hour I I I 2 1 0 0 106 219 15 ZI 113 41 * 57 10 20 10 1 1 8 1 1 5th Ave S Walnut St Walnut St 5th Ave S 0 1 8 F-8 16 1 8 319 1 677 358 14 1 282 1 23 0 Ib 5th Ave S Walnut St F952 Walnut St 5th Ave S 1� 4P 36 1 317 1 41 F -383 777 394 C4 1 0 1 0 2 11, [26 1:3 56 126 231 105 T North I T North I T North I T North I I 5 5th Ave S @ Walnut St Page 10 of 12 I I I I I I I I I I I I I I Total Pipeline Project Trips 1 0 0 Average Weekday 0 1 0 0 PM Peak Hour 4 Ib 5th Ave S [:S 0 0 413 0 0 0 0 Walnut St Walnut St 0 0 0 0 0 5th Ave S 0 0 1 0 F-O 0 1 0 1 F Pass -By Project Trips 0 1 0 0 Average Weekday 0 1 0 0 PM Peak Hour 0 Ib 5th Ave S 0 0 0 0 0 0 Walnut St Walnut St 0 0 0 0 0 5th Ave S I 9;� 1D 0 0 0 F-0 0 1 0 7� F T North I T North I I K5 I 6 5th Ave S @ Access Page 11 of 12 I I I I I i Synchro ID: 6 Existing 279 570 291 Average Weekday 0 1 279 0 PM Peak Hour 0 I�J 5th Ave S Year: 1/23/07 0 Data Source: TDG 0 Access F570 0 From the intersection of 5th at 0 0 Dayton St. 0 5th Ave S 0 291 b 279 570 1 291 Future without Project Average Weekday PM Peak Hour Year: 2012 Growth Rate � 2,00/6 Years of Growth = 5 Total Growth = 1.1041 I I I I I I I I ro 0 1:3 0 0 0 0 0 North 0 —308 629 321 0 1 308 0 0 5th Ave S 0 0 0 0 0 0 0 Access E-629� 0 North 0 0 0 0 0 5th Ave S 0 321 0 F-308 629 1 321 Total Project Trips F-6 1 32 26 Average Weekday 6 1 0 0 PM Peak Hour 0 4 1�3 5th Ave S 13 4:2 0 0 0 0 46 Access 0 North 0 5th Ave S I 7 4 1 22 1 11 Future with Project [-314 674 360 Average Weekday 12 1 302 1 0 PM Peak Hour 0 5th Ave S 29 0 0 0 12 ff 0 91 Access F708 No rth C* 0 5th Ave S I 17 1 315 0 F-319 651 1 332 I Ib 6 5th Ave S @ Access Page 12 of 12 Total Pipeline Project Trips 0 1 0 0 Average Weekday 0 1 0 0 PM Peak Hour 0 lb 5th Ave S 0 0 1:3 0 0 0 0 Access 0 0 q 0 0 0 0 5th Ave S 174 1� F- 0 0 T 1 0 0 Pass -By Project Trips 0 13 13 Average Weekday 6 1 -6 0 PM Peak Hour 4 5th Ave S 0 16 0 0 0 0 45 Access 0 23 41 29 0 0 6 5th Ave S 10 -10 0 0 1- 0 F I � I T North I T North I � 1 17 ui I LU LL 0 .0 (A- t- a � Lu 4 0 L) z LLJ W in 0 UJ 3 CL C=fc(o ch3 w m I 41P 4k > F4 J4- wl a. u L H:\2006\06-382\Synchro\Existing.sy7 1: Dayton St & 5th Ave S Bank of WA (06-382) --* ---I. --* \,r *-- *\ t /". \I. -4/ Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations *4 4� #4 *4 Sign Control Stop Stop Stop Stop Volume (vph) 27 135 94 33 113 26 75 181 35 10 152 20 Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Hourly flow rate (vph) 28 139 97 34 116 27 77 187 36 10 157 21 Direction, Lane # EB I WB 1 N13 1 SB 1 Volume Total (vph) 264 177 300 188 Volume Left (vph) 28 34 77 10 Volume Right (vph) 97 27 36 21 Hadj (s) -0.17 -0.02 0.01 -0.02 Departure Headway (s) 5.5 5.8 5.5 5.7 Degree Utilization, x 0.40 0.28 0.46 0.30 Capacity (veh/h) 606 559 604 570 Control Delay (s) 12.0 11.0 13.1 11.1 Approach Delay (s) 12.0 11.0 13.1 11.1 Approach LOS B B B B Intersection Summary Delay 12.0 HCM Level of Service B Intersection Capacity Utilization 52.2% ICU Level of Service A Analysis Period (min) 15 GTC (MJP) Existing Gibson Traffic Consultants, Inc. L, I 11 I I I I I I I I I I H:\2006\06-382\Synchro\Existing'.sy7 2: Dayton St & 4th Ave S Bank of WA (06-382) _# __p. I-* r *-- k 4% t /,I- \1p. � 4/ Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 4 4 4 4 Sign Control Free Free Stop Stop Grade 0% 0% 0% 0% Volume (veh/h) 20 185 10 7 155 31 8 10 9 17 9 15 Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 Hourly flow rate (vph) 23 215 12 8 180 36 9 12 10 20 10 17 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 216 227 505 500 221 498 488 198 vC1, stage I conf vol vC2, stage 2 conf vol vCu, unblocked vol 216 227 505 500 221 498 488 198 tC, single (s) 4.1 4.1 7.2 6.6 6.2 7.2 6.6 6.2 tC, 2 stage (s) tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 pO queue free % 98 99 98 97 99 96 98 98 cM capacity (veh/h) 1336 1324 447 457 811 454 465 835 Direction, Lane # EB 1 WB 1 NB 1 SB 1 Volume Total 250 224 31 48 Volume Left 23 8 9 20 Volume Right 12 36 10 17 cSH 1336 1324 531 548 Volume to Capacity 0.02 0.01 0.06 0.09 Queue Length 95th (ft) 1 0 5 7 Control Delay (s) 0.9 0.3 12.2 12.2 Lane LOS A A B B Approach Delay (s) 0.9 0.3 12.2 12.2 Approach LOS B B Intersection Summary Average Delay 2.3 Intersection Capacity Utilization 29.0% ICU Level of Service A Analysis Period (min) 15 GTC (MJP) Gibson Traffic Consultants, Inc. Existing I 2D H:\.2006\06-382\Synchro\Existing'.sy7 3: Dayton St & 3rd Ave S Bank of WA (06-382) -.4 --* -'V #e 4,- 4\ Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Sign Control *T+ Stop 4 Stop *4 Stop 4� Stop Volume (vph) 73 113 9 15 113 43 41 77 27 55 88 55 Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 Hourly flow rate (vph) 83 128 10 17 128 49 47 88 31 62 100 62 Direction, Lane # EB 1 WB 1 NB 1 SB 1 Volume Total (vph) 222 194 165 225 Volume Left (vph) 83 17 47 63 Volume Right (vph) Hadj (s) 10 0.12 49 -0.07 31 0.01 63 -0.04 Departure Headway (s) 5.4 5.3 5.4 5.3 Degree Utilization, x 0.33 0.28 0.25 0.33 Capacity (veh/h) 616 625 596 629 Control Delay (s) 11.1 10.4 10.2 10.9 Approach Delay (s) 11.1 10.4 10.2 10.9 Approach LOS B B B B Intersection Summary Delay 10.7 HCM Level of Service B Intersection Capacity Utilization 44.5% ICU Level of Service A Analysis Period (min) 15 I I I I I I I GTC (MJP) Gibson Traffic Consultants, Inc. Existing 1 21 I I H:\2006\06-382\Synchro\Existing'.sy7 4: Main St & 5th Ave S Bank of WA (06-382) --* --I. N 'e- 4-- -4\ Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Sign Control 4 Stop 4* Stop 4* Stop 4 Stop Volume (vph) 15 120 118 35 159 24 78 52 87 15 33 28 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Hourly flow rate (vph) 17 133 131 39 177 27 87 58 97 17 37 31 Direction, Lane # EB 1 W13 1 NB 1 SB I Volume Total (vph) 281 242 241 84 Volume Left (vph) 17 39 87 17 Volume Right (vph) Hadj (s) 131 -0.25 27 -0.02 97 -0.15 31 -0.16 Departure Headway (s) 4.9 5.2 5.2 5.5 Degree Utilization, x 0.38 0.35 0.35 0.13 Capacity (veh/h) 682 646 626 567 Control Delay (s) 10.9 11.0 11.0 9.3 Approach Delay (s) 10.9 11.0 11.0 9.3 Approach LOS B B B A Intersection Summary Delay 10.8 HCM Level of Service B Intersection Capacity Utilization 47.5% ICU Level of Service A Analysis Period (min) 15 I 11 I I GTC (MJP) Gibson Traffic Consultants, Inc. Existing 1 22 I I H:\2006\06-382\Synchro\Existing'.sy7 5: Walnut St & 5th Ave S Bank of WA (06-382) --* --0- -* 'r +-- 4.- 4\ Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Sign Control 4* Stop 4 Stop 4 Stop 4 Stop I I I I I I 1� r- I tA I I Pi Volume (vph) 13 37 52 40 51 23 33 280 37 20 248 12 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Hourly flow rate (vph) 14 41 58 44 57 26 37 311 41 22 276 13 Direction, Lane # EB 1 WB 1 NB 1 SB 1 Volume Total (vph) 113 127 389 311 Volume Left (vph) 14 44 37 22 Volume Right (vph) 58 26 41 13 Hadj (s) -0.26 -0.03 -0.03 0.01 Departure Headway (s) 5.7 5.9 5.1 5.2 Degree Utilization, x 0.18 0.21 0.55 0.45 Capacity (veh/h) 534 533 678 658 Control Delay (s) 9.9 10.4 13.9 12.3 Approach Delay (s) 9.9 10.4 13.9 12.3 Approach LOS A B B B Intersection Summary Delay 12.4 HCM Level of Service B Intersection Capacity Utilization 46.1% ICU Level of Service A Analysis Period (min) 15 GTC (MJP) I Gibson Traffic Consultants, Inc. Existing 1 23 I 11 U I I I I I I I I I I I I I I H:\2006\06-382\Synchro\Baselin'e-sy7 1: Dayton St & 5th Ave S Bank of WA (06-382) ---* --* --v \0� 4/ Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBIL SBT SBR Lane Configurations 41� *T* *T* 41� Sign Control Stop Stop Stop Stop Volume (vph) 30 149 104 36 125 29 83 200 39 11 168 22 Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Hourly flow rate (vph) 31 154 107 37 129 30 86 206 40 11 173 23 Direction, Lane # EB 1 W13 1 N13 1 S13 1 Volume Total (vph) 292 196 332 207 Volume Left (vph) 31 37 86 11 Volume Right (vph) 107 30 40 23 Hadj (s) -0.17 -0.02 0.01 -0.02 Departure Headway (s) 5.7 6.1 5.8 6.0 Degree Utilization, x 0.47 0.33 0.53 0.35 Capacity (veh/h) 572 514 578 525 Control Delay (s) 13.6 12.1 15.2 12.1 Approach Delay (s) 13.6 12.1 15.2 12.1 Approach LOS B B C B Intersection Summary Delay 13.5 HCM Level of Service B Intersection Capacity Utilization 56.8% ICU Level of Service B Analysis Period (min) 15 GTC (MJP) Gibson Traffic Consultants, Inc. Baseline 2012 1 I I I I I I I I 1� H:\2006\06-382\Synchro\Baselin'e.sy7 2: Dayton St & 4th Ave S Bank of WA (06-382) _-* __* -,V r *- 4_ 4N t /I- ',* 1 4/ Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations *1� + 4+ + Sign Control Free Free Stop Stop Grade 0% 0% 0% 0% Volume (veh/h) 22 204 11 8 171 34 9 11 10 19 10 17 Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 Hourly flow rate (vph) 26 237 13 9 199 40 10 13 12 22 12 20 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 238 250 558 552 244 550 538 219 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 238 250 558 552 244 550 538 219 tC, single (s) 4.1 4.1 7.2 6.6 6.2 7.2 6.6 6.2 tC, 2 stage (s) tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 pO queue free % 98 99 97 97 99 95 97 98 cM capacity (veh/h) 1311 1298 408 426 788 416 434 814 Direction, Lane # EB 1 W131 NB1 S13 1 Volume Total 276 248 35 53 Volume Left 26 9 10 22 Volume Right 13 40 12 20 cSH 1311 1298 495 513 Volume to Capacity 0.02 0.01 0.07 0.10 Queue Length 95th (ft) 1 1 6 9 Control Delay (s) 0.9 0.4 12.8 12.8 Lane LOS A A B B Approach Delay (s) 0.9 0.4 12.8 12.8 Approach LOS B B Intersection Summary Average Delay 2.4 Intersection Capacity Utilization 31.1% ICU Level of Service A Analysis Period (min) 15 I I GTC (MJP) Gibson Traffic Consultants, Inc. Baseline 2012 1 :215 H:\2006\06-382\Synchro\Baselinb.sy7 3: Dayton St & 3rd Ave S Bank of WA (06-382) -A --* --v f- *- *- - 4\ 4/ Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Sign Control 4 Stop 4 Stop 4* Stop 4 Stop I I I I 1] I I I I I I I olume (vph) 81 125 10 17 125 47 45 85 30 61 97 61 Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 V Hourly flow rate (vph) 92 142 11 19 142 53 51 97 34 69 110 69 Direction, Lane # EB 1 WB 1 NB I SB I Volume Total (vph) 245 215 182 249 Volume Left (vph) 92 19 51 69 Volume Right (vph) 11 53 34 69 Hadj (s) 0.12 -0.06 0.01 -0.04 Departure Headway (s) 5.6 5.5 5.7 5.5 Degree Utilization, x 0.38 0.33 0.29 0.38 Capacity (veh/h) 590 596 568 602 Control Delay (s) 12.1 11.2 10.9 11.8 Approach Delay (s) 12.1 11.2 10.9 11.8 Approach LOS B B B B Intersection Summary Delay 11.6 HCM Level of Service B Intersection Capacity Utilization 48.2% ICU Level of Service A Analysis Period (min) 15 GTC (MJP) Gibson Traffic Consultants, Inc. Baseline 2012 1 2�0 H:\2006\06-382\Synchro\Baselin6.sy7 4: Main St & 5th Ave S Bank of WA (06-382) --* ---W -'10 1* 1 q/ Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 4 4 4 4 Sign Control Stop Stop Stop Stop Volume (vph) 17 132 130 39 176 26 86 57 96 17 36 31 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Hourly flow rate (vph) 19 147 144 43 196 29 96 63 107 19 40 34 Direction, Lane # EB 1 WB I NB 1 SB 1 Volume Total (vph) 310 268 266 93 Volume Left (vph) 19 43 96 19 Volume Right (vph) Hadj (s) 144 -0.25 29 -0.02 107 -0.15 34 -0.16 Departure Headway (s) 5.1 5.4 5.5 5.8 Degree Utilization, x 0.44 0.40 0.40 0.15 Capacity (veh/h) 655 620 602 520 Control Delay (s) 12.1 12.0 12.1 9.8 Approach Delay (s) 12.1 12.0 12.1 9.8 Approach LOS B B B A Intersection Summary Delay 11.8 HCM Level of Service B Intersection Capacity Utilization 51.0% ICU Level of Service A Analysis Period (min) 15 GTC (MJP) Gibson Traffic Consultants, Inc. Baseline 2012 1 27 H:\2006\06-382\Synchro\Baselin6.sy7 5: Walnut St & 5th Ave S Bank of WA (06-382) 4-- 4, _ 4-\ t /I - Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations *T* *T* *4 *T* Sign Control Stop Stop Stop Stop Volume (vph) 14 41 57 44 56 25 36 309 41 22 274 13 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Hourly flow rate (vph) 16 46 63 49 62 28 40 343 46 24 304 14 Direction, Lane # EB I WB I NB I SB 1 Volume Total (vph) 124 139 429 343 Volume Left (vph) 16 49 40 24 Volume Right (vph) 63 28 46 14 Hadj (s) -0.26 -0.03 -0.03 0.01 Departure Headway (s) 6.0 6.2 5.2 5.4 Degree Utilization, x 0.21 0.24 0.62 0.51 Capacity (veh/h) 504 501 656 633 Control Delay (s) 10.6 11.1 16.5 14.0 Approach Delay (s) 10.6 11.1 16.5 14.0 Approach LOS B B C B Intersection Summary Delay 14.2 HCM Level of Service B Intersection Capacity Utilization 49.3% ICU Level of Service A Analysis Period (min) 15 I I I I I I I GTC (MJP) Baseline 2012 Gibson Traffic Consultants, Inc. 1 ZZ H:\2006\06-382\Synchro\FutureW.sy7 1: Dayton St & 5th Ave S Bank of WA (06-382) -.4 4% t /P. 1* -V Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Sign Control 4* Stop 4 Stop 4+ Stop 4 Stop I 11 I I 11 I I I I I I I I Volume (vph) 30 149 104 40 128 29 101 207 53 11 170 27 Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Hourly flow rate (vph) 31 154 107 41 132 30 104 213 55 11 175 28 Direction, Lane # EB1 WB1 N131 S131 Volume Total (vph) 292 203 372 214 Volume Left (vph) 31 41 104 11 Volume Right (vph) 107 30 55 28 Hadj (s) -0.17 -0.01 0.00 -0.03 Departure Headway (s) 6.0 6.3 5.9 6.2 Degree Utilization, x 0.49 0.36 0.61 0.37 Capacity (veh/h) 539 495 572 511 Control Delay (s) 14.5 12.8 17.8 12.8 Approach Delay (s) 14.5 12.8 17.8 12.8 Approach LOS B B C B Intersection Summary Delay 15.0 HCM Level of Service B Intersection Capacity Utilization 59.1% ICU Level of Service B Analysis Period (min) 15 GTC (MJP) Gibson Traffic Consultants, Inc. Future 2012 With I I I I I I I I I I F I I I H:\2006\06-382\Synchro\FutureW.sy7 2: Dayton St & 4th Ave S Bank of WA (06-382) --* --m- --* 'e, +- 4-- 4N t /0� \IN. 4/ Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations *4 4* 4 4 Sign Control Free Free Stop Stop Grade 0% 0% 0% 0% Volume (veh/h) 22 211 11 9 178 34 9 11 11 19 10 17 Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 Hourly flow rate (vph) 26 245 13 10 207 40 10 13 13 22 12 20 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 247 258 576 570 252 570 557 227 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 247 258 576 570 252 570 557 227 tC, single (s) 4.1 4.1 7.2 6.6 6.2 7.2 6.6 6.2 tC, 2 stage (s) tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 pO queue free % 98 99 97 97 98 95 97 98 cM capacity (veh/h) 1302 1289 396 415 780 402 423 805 Direction, Lane # EB 1 WB 1 NB 1 S13 1 Volume Total 284 257 36 53 Volume Left 26 10 10 22 Volume Right 13 40 13 20 cSH 1302 1289 490 500 Volume to Capacity 0.02 0.01 0.07 0.11 Queue Length 95th (ft) 2 1 6 9 Control Delay (s) 0.9 0.4 12.9 13.1 Lane LOS A A B B Approach Delay (s) 0.9 0.4 12.9 13.1 Approach LOS B B Intersection Summary Average Delay 2.4 Intersection Capacity Utilization 31.2% ICU Level of Service A Analysis Period (min) 15 GTC (MJP) Gibson Traffic Consultants, Inc. OU Future 2012 With H:\2006\06-382\Synchro\FutureW.sy7 3: Dayton St & 3rd Ave S Bank of WA (06-382) 4\ t Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Sign Control + Stop + Stop + Stop + Stop I I I I I I I Ll I I I I I Volume (vph) 81 129 10 18 129 49 45 85 31 63 97 61 Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 Hourly flow rate (vph) 92 147 11 20 147 56 51 97 35 72 110 69 Direction, Lane # EB 1 WB 1 NB I SB 1 Volume Total (vph) 250 223 183 251 Volume Left (vph) 92 20 51 72 Volume Right (vph) 11 56 35 69 Hadj (s) 0.11 -0.06 0.01 -0.04 Departure Headway (s) 5.7 5.5 5.7 5.6 Degree Utilization, x 0.39 0.34 0.29 0.39 Capacity (veh/h) 586 593 560 595 Control Delay (s) 12.3 11.4 11.1 12.0 Approach Delay (s) 12.3 11.4 11.1 12.0 Approach LOS B B B B Intersection Summary Delay 11.8 HCM Level of Service B Intersection Capacity Utilization 49.1% ICU Level of Service A Analysis Period (min) 15 GTC (MJP) Gibson Traffic Consultants, Inc. Future 2012 With H:\2006\06-382\Synchro\FutureW.sy7 4: Main St & 5th Ave S Bank of WA (06-382) --* --P, -,* 'r *-- I,- 4\ 1'0� -V Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 4* 4 *1� 41� Sign Control Stop Stop Stop Stop Volume (vph) 17 132 133 41 176 26 89 59 98 17 38 31 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Hourly flow rate (vph) 19 147 148 46 196 29 99 66 109 19 42 34 Direction, Lane # EB 1 WB I NB1 SB 1 Volume Total (vph) 313 270 273 96 Volume Left (vph) 19 46 99 19 Volume Right (vph) Hadj (s) 148 -0.25 29 -0.01 109 -0.15 34 -0.16 Departure Headway (s) 5.2 5.5 5.5 5.8 Degree Utilization, x 0.45 0.41 0.42 0.15 Capacity (veh/h) 649 614 599 515 Control Delay (s) 12.3 12.2 12.4 9.9 Approach Delay (s) 12.3 12.2 12.4 9.9 Approach LOS B B B A Intersection Summary Delay 12.0 HCM Level of Service B Intersection Capacity Utilization 52.2% ICU Level of Service A Analysis Period (min) 15 I I I 11 F-j GTC (MJP) Future 2012 With Gibson Traffic Consultants, Inc. 1 �2 H:\2006\06-382\Synchro\FutureW.sy7 5: Walnut St & 5th Ave S Bank of WA (06-382) -A 1'* -V Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Sign Control 4 Stop 4* Stop 4 Stop 4 Stop Volume (vph) 15 41 57 44 56 26 36 317 41 23 282 14 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Hourly flow rate (vph) 17 46 63 49 62 29 40 352 46 26 313 16 Direction, Lane # EB I WB 1 NBI SB 1 Volume Total (vph) 126 140 438 354 Volume Left (vph) 17 49 40 26 Volume Right (vph) Hadj (s) 63 -0.26 29 -0.04 46 -0.03 16 0.01 Departure Headway (s) 6.1 6.2 5.3 5.4 Degree Utilization, x 0.21 0.24 0.64 0.53 Capacity (veh/h) 497 484 652 630 Control Delay (s) 10.7 11.2 17.2 14.5 Approach Delay (s) 10.7 11.2 17.2 14.5 Approach LOS B B C B Intersection Summary Delay 14.7 HCM Level of Service B Intersection Capacity Utilization 49.7% ICU Level of Service A Analysis Period (min) 15 F I LI I I I I I I GTC: (MJP) Future 2012 With Gibson Traffic Consultants, Inc. 1 -5-3 I I I I I I P I I I I I I I I I H:\2006\06-382\Synchro\FutureW.sy7 6: Access & 5th Ave S Bank of WA (06-382) ---,* -'V 4\ Movement EBL EBR NBL NBT SBT SBR Lane Configurations Y #1 1� Sign Control Stop Free Free Grade 0% 0% 0% Volume (veh/h) 45 17 17 315 302 12 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 49 18 18 342 328 13 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 714 335 341 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 714 335 341 tC, single (s) 6.4 6.2 4.1 tC, 2 stage (s) tF (s) 3.5 3.3 2.2 pO queue free % 88 97 98 cM capacity (veh/h) 392 707 1218 Direction, Lane # EB 1 NB 1 SB 1 Volume Total 67 361 341 Volume Left 49 18 0 Volume Right 18 0 13 cSH 446 1218 1700 Volume to Capacity 0.15 0.02 0.20 Queue Length 95th (ft) 13 1 0 Control Delay (s) 14.5 0.6 0.0 Lane LOS B A Approach Delay (s) 14.5 0.6 0.0 Approach LOS B Intersection Summary Average Delay 1.5 Intersection Capacity Utilization 40.6% ICU Level of Service A Analysis Period (min) 15 GTC (MJP) Gibson Traffic Consultants, Inc. Future 2012 With I s1f TTRAFFIC DATA GATHERING TURNING MOVEMENTS DIAGRAM 4:00 - 6:00 PM PEAK HOUR: 4:30 PM TO 5:30 PM 416 C F1 82] LO 20 1 152 1 10 't 27 135 94 INTERSECTION PEAK HOUR VOLUME :5 U') IN 901 JOUT 1 901 1 COUNTED BY: RH REDUCED BY: CN DATE: Tue. 1/23/07 F279� F234] 75 1 181 1 35 rE I 1 570 1 5th Avenue @ Dayton Street Edmonds, WA "315 26 113 33 cli I Ul) I HV I PHF I SB 1% 0.83 N13 2% 0.94 WB 2% 0.83 EB 1 3 0/c 084 IINTRS.1 2% �= HV Heavy Vehicles PHF Peak Hour Factor DATE OF COUNT: Tue. 1/23/07 TIME OF COUNT: 4:00 - 6:00 PM WEATHER: Overcast TTRAFFIC DATA GA MEIHNG INTERSECTION TURNING MOVEMENTS REDUCTION SHEET LOCATION: 5th Avenue a Dayton Street DATE OF COUNT: Tue. 1/23/07 COUNTED BY: RH IEdmonds, WA TIME OF COUNT: 4:00 - 6:00 PM WEATHER: Overcast TIME INTERVAL ENDING AT FROM NORTH ON 5th Avenue FROM SOUTH ON Sth Avenue FROM EAST ON Dayton Street FROM WEST ON Dayton Street INTERVAL TOTALS HV Left Thru Right HV Left Thru, Right HV Left Thru Right HV Left Thru Right 02:15 PM 0 0 0 0 0 0 0 o 0 0 0 0 1 0 0 0 0 1 0 02:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:00 PM 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 03:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:15 PM 0 5 46 3 0 10 37 8 2 10 18 5 2 8 25 14 189 04:30 PM 1 1 33 7 2 17 46 3 1 6 23 2 1 2 7 25 12 182 04:45 PM 0 2 27 7 1 20 36 10 1 12 29 7 2 5 43 17 1 215 05:00 PM 1 2 50 3 2 24 45 7 1 7 32 13 2 3 18 28 232 05:15 PM 0 1 44 5 0 16 52 9 1 6 23 0 1 7 42 27 232 05:30 PM 0 5 31 5 2 15 48 9 0 8 29 6 3 12 32 22 222 05:45 PM 0 0 28 5 1 12 42 13 2 9 15 6 3 5 31 17 183 06:00 PM 0 4 29 6 2 15 42 17 1 10 11 6 2 3 38 17 198 PEAK HOUR TOTALS 1 10 5 75 181 1 35 3 1 33 1 113 26 8 1 27 1 135 94 INTERSECTION ALL MOVEMENTS 182 291 172 256 901 % HV 1% 1 2% 2% 3% 2% PEAK HOUR CTOR 0.83 0.94 0.83 0.84 0.97 HV =Heavy Vehicles PHF = Peak Hour Factor 4:00 - 6:00 PM PEAK HOUR: 4:30 PM TO 5:30 PM REDUCED BY: CN DATE OF REDUCTION 1/23/2007 Cl) 0) TTRAFFIC DATA GATHERING TURNING MOVEMENTS DIAGRAM 4:00 - 6:00 PM PEAK HOUR: 4:15 PM TO 5:15 PM 1 2 C 41 F61 F [1-5 1 9 17 20 185 10 INTERSECTION PEAK HOUR VOLUME IN 476 IOUT 476 1 COUNTED BY: CN REDUCED BY: CN DATE: Tue. 1/23/07 [H] 53 8 1 10 1 9 r277 4th Avenue @ Dayton Street Edmonds, WA 13�7 31 155 7 HV I PH;: S13 5% 0.73 NB 4% 0.68 WB 5% 0.88 EB 1 5 0/c I 1INTRS.1 5% 1 0.86 -1 HV Heavy Vehicles PHF Peak Hour Factor DATE OF COUNT: Tue. 1/23/07 TIME OF COUNT: 4:00 - 6:00 PM WEATHER: Overcast TTRA FFIC DA TA GA THEf UNG INTERSECTION TURNING MOVEMENTS REDUCTION SHEET LOCATION: 4th Avenue @ Dayton Street DATE OF COUNT: Tue. 1123/07 COUNTED BY: CN Edmonds, WA TIME OF COUNT: 4:00 - 6:00 PM —WEATHER: Overcast TIME INTERVAL ENDING AT FROM NORTH ON 4th Avenue FROM SOUTH ON 4th Avenue FROM EASTON Dayton Street FROM WEST ON Dayton Street INTERVAL TOTALS HV Left Thru Right HV Left Thru Right HV Left Thru Right HV Left Thru Right 0215 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a 03:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:15 PM 0 0 0 0 0. 0 0 0 0 0 0 0 0 0 0 0 0 03:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:00 PM 0- 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:15 PM 0 1 1 3 0 1 3 1 1 1 29 5 1 2 41 0 88 04:30 PM 0 1 1 2 0 1 1 3 2 1 3.5 5 3 9 39 3 101 04:45 PM 2 7 3 4 1 1 2 2 3 3 36 11 3 4 44 2 119 05:00 PM 0 5 4 4 0 2 3 2 2 2 41 12 2 5 38 0 118 05:15 PM 0— 4 1 5 0 4 4 2 3 1 43 3 2 2 64 5 138 05:30 PM 0 6 0 3 0 1 3 3 2 1 33 8 2 3 35 2 98 05:45 PM 0 7 2 0 1 4 0 2 3 0 26 1 2 1 48 1 92 06:00 PM 0 4 1 4 0 2 1 1 2 2 20 5 2 3 54 2 99 PEAK HOUR TOTALS 2 1 17 1 9 1 15 1 8 10 9 10 7 155 31 10 20 185 10 INTERSECTION ALL MOVEMENTS 41 27 193 215 476 %HV 5% 4% 5% 5% 5% PEAK HOUR FACTOR 0.73 0.68 0.88 0.76 0.86 HV =Heavy Vehicles PHF = Peak Hour Factor 4:00 - 6:00 PM PEAK HOUR: 4:15 PM TO 5:15 PM REDUCED BY: CN DATE OF REDUCTION: 1/23/2007 0 U TTRAFFIC DATA GATHERING TURNING MOVEMENTS DIAGRAM 4:00 - 6:00 PM PEAK HOUR: 4:30 PM TO 5:30 PM 391 F1 98] 7E 55 1 88 1 55 73 113 9 INTERSECTION CD PEAK HOUR VOLUME C) IN 709 ,OUT 709 1 COUNTED BY: KH REDUCED BY: CN DATE: Tue. 1/23/07 El F193 41 1 77 1 27 r145] 1 257 1 3rd Avenue @ Dayton Street Edmonds, WA 43 113 15 CD w C- 30- I HV I PHF I SB 3% 0.85 N13 2% 0.95 WB 7% 0.91 EB , 6% 0*72 INTRS.1 4% 7�� HV Heavy Vehicles PHF Peak Hour Factor DATE OF COUNT: Tue. 1/23/07 TIME OF COUNT: 4:00 - 6:00 PM WEATHER: Overcast I TTRAFFIC DATA GATHERING INTERSECTION TURNING MOVEMENTS REDUCTION SHEET LOCATION: 3rd Avenue at Dayton Street DATE OF COUNT: Tue. 1/23/07 COUNTED BY: KH IEdmonds, WA TIME OF COUNT: 4:00 - 6:00 PM WEATHER: Overcast TIME INTERVAL ENDING AT FROM NORTH ON 3rd Avenue FROM SOUTH ON 3rd Avenue FROM EAST ON Dayton Street FROM WEST ON Dayton Street INTERVAL TOTALS HV Left Thru Right HV Left Thru Right HV Left Thru Right HV Left Thru Right 02:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:00 PM 0 0 0 0 0 0 0 0 0 1 0 0 1 0 0 1 0 0 0 0 03:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:00 PM 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 1 0 0 04:15 PM 2 8 22 9 2 11 29 1 3 2 22 5 1 13 28 4 154 04:30 PM 0 11 23 3 1 13 19 1 10 5 7 31 16 1 10 28 1 172 04:45 PM 1 14 18 16 0 11 15 8 4 5 28 7 1 14 29 1 166 05:00 PM 1 15 19 8 1 13 14 10 5 4 26 9 0 10 25 3 156 05:15 PM 2 14 21 15 1 8 24 6 2 4 27 14 8 25 40 3 201 05:30 PM 1 12 30 16 1 9 24 3 1 2 32 13 2 24 19 2 186 05:45 PM 1 13 27 16 1 9 15 1 3 2 4 22 15 3 15 22 3 164 06:00 PM 0 15 11 0 10 IT97 3 1 3 15 11 1 23 24 2 148 PEAK HOUR TOTALS 5 55 3 41 E27 12 1 15 1 113 1 43 11 73 113 9 INTERSECTION ALL MOVEMENTS 198 145 171 195 709 % HV 3% 2% 7% 6% 4% PEAK HOUR FACTOR 0.85 0.95 0.91 0.72 0.88 HV =Heavy Vehicles PHF = Peak Hour Factor 4:00.6:00PM PEAK HOUR: 4:30 PM -TO 5:30 PM REDUCED BY: CN DATE OF REDUCTION: 1/23/2007 TTRAFFIC DATA GATHERING TURNING MOVEMENTS DIAGRAM 4:00 - 6:00 PM PEAK HOUR: 4:00 PM TO 5:00 PM 1 5 12. 1 1. INTERSECTION PEAK HOUR VOLUME IN 764 JOUT 764 COUNTED BY: JH REDUCED BY: CN DATE: Tue. 1/23/07 F76] 28 1 33 1 15 El 167 F91 I 78 1 52 1 87 F2177 1 403 1 5th Avenue @ Main Street Edmonds, WA q/ 24 159 35 --1 HV I PHF S13 1% 0.73 -N13 0% 0.88 W13 1% 0.81 EB 1 2% 0.79 IINTRS.1 1% 0.90 HV Heavy Vehicles PHF Peak Hour Factor DATE OF COUNT: Tue. 1/23/07 TIME OF COUNT: 4:00 - 6:00 PM WEATHER: Overcast PTOTRAFFIC DATA GA THE;ZfNG INTERSECTION TURNING MOVEMENTS REDUCTION SHEET LOCATION: Sth Avenue 0 Main Street DATE OF COUNT: Tue. 1/23107 COUNTED BY: IEdmonds, WA TIME OF COUNT: 4:00 - 6:00 PM WEATHER: JH TIME INTERVAL ENDING AT FROM NORTH ON 5th Avenue FROM SOUTH ON 5th Avenue FROM EAST ON Main Street FROM WEST ON Main Street INTERVAL TOTALS HV Left Thru Right HV Left Thru Right HV Left Thru Right HV Left Thru Rlaht 02:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:45 PM 0 0 0 0 0 0 0 0 1 0 0 1 0 0 1 0 0 0 0 0 03:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:45 PM 0 0 0 0 0 0 0 1 0 0 1 0 1 0 0 1 0 0 0 0 0 04:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:15 PM 0 2 5 10 0 16 16 17 0 9 50 8 6 1 37 37 213 04:30 PM 0 7 12 7 1 22 16 18 1 8 32 7 -2 0 3 25 27 184 04:45 PM 1 0 7 5 0 17 13 20 0 5 33 7 0 0 27 23 157 05:00 PM 0 6 9 6 0 23 7 32 2 13 44 2 2 6 31 31 210 05:15 PM 0 5 15 10 0 14 15 25 0 6 36 5 0 6 44 22 203 05:30 PM 0 9 18 7 1 44 17 7 1 6 29 2 1 0 8 24 12 183 05:45 PM 0 1 6 1 0 12 1 9 33 0 7 28 5 0 3 1 29 24 158 06:00 PM 0 2 12 2 0 23 15 19 0 4 19 6 0 1 29 24 156 PEAK HOUR TOTALS I is 33 28 1 78 52 1 87 3 1 35 1 159 24 4 1 15 120 118 INTERSECTION ALL MOVEMENTS 76 217 218 253 764 % HV 1% 0% 1% 2% 1 0 PEAK HOUR FACTOR 0.73 0.88 0.81 0.79 0.4n HV =Heavy Vehicles PHF = Peak Hour Factor REDUCED BY: CN 4:00 - 6:00 PM PEAK HOUR: 1 4:00 PM TO 5:00 PM ::] DATE OF REDUCTION: 1/23/2007 TTRAFFIC DATA GA THEFUNG TURNING MOVEMENTS DIAGRAM 4:00 - 6:00 PM PEAK HOUR: 4:30 PM TO 5:30 PM a) 2807 a) F to 12 1 248 1 20 00 CD 13 3, 52 INTERSECTION PEAK HOUR VOLUME IN 846 OUT 846 COUNTED BY: MV REDUCED BY: CN DATE: Tue. 1/23/07 596 F316] 33 1 280 1 37 EE 1 1 690 1 5th Avenue @ Walnut Street Edmonds, WA 23 51 40 00 94 --1 HV I PHF SB 2% 0.81 NB 1% 0.83 W13 0% 0.86 EB 1 0% 0.85 IINTRS.1 1% 0.90 HV Heavy Vehicles PHF Peak Hour Factor DATE OF COUNT: Tue. 1/23/07 TIME OF COUNT: 4:00 - 6:00 PM WEATHER: Overcast FAWN WAWA TTRAFFIC DATA GATHERING INTERSECTION TURNING MOVEMENTS REDUCTION SHEET LOCATION: 5th Avenue a Walnut Street DATE OF COUNT: Tue. 1/23107 COUNTED BY: MV IEdmonds, WA TIME OF COUNT: 4:00 - 6:00 PM —WEATHER: Overcast TIME INTERVAL ENDING AT FROM NORTH ON 5th Avenue FROM SOUTH ON 5th Avenue FROM EAST ON Walnut Street FROM WEST ON Walnut Street INTERVAL TOTALS HV Left Thru Right HV Left Thru Right HV Left Thru Right HV Left Thru Right 02:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 03:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:15 PM 0 2 54 1 0 4 56 5 0 13 10 3 0 4 9 14 175 04:30 PM 1 5 43 3 2 5 60 6 0 10 8 5 0 2 9 12 168 04:45 PM 1 1 50 3 1 12 68 12 0 8 16 9 0 5 8 17 209 05:00 PM 2 8 77 1 2 8 65 6 0 13 15 5 0 2 6 12 218 05:15 PM 1 9 66 6 0 8 84 13 0 10 8 4 0 3 12 13 236 05:30 PM 1 2 55 2 2 5 63 6 0 9 12 5 0 3 11 10 183 05:45 PM 0 3 66 3 1 8 61 9 0 6 1 6 4 0 3 6 13 188 06:00 PM 0 1 56 3 2 7 59 6 0 7 4 4 1 4 3 12 166 PEAK HOUR TOTALS 5 20 12 5 33 280 37 0 23 0 13 37 52 INTERSECTION ALL MOVEMENTS 280 350 1 114 102 846 % HV 2% 1% 0% 0% 1% PEAK HOUR FACTOR 0.81 0.83 0.86 0.85 0.90 HV o Heavy Vehicles PHF = Peak Hour Factor 4:00 - 6:00 PM PEAK HOUR: 4:30 PM TO 5:30 PM REDUCED BY: CN DATE OF REDUCTION: 1/23/2007 Ll I L4, I Edmonds Rood Impact Fee Rate Study TABLE 4 IMPACT FEE RATES 1 (1) (2) (3) (4) (5) (6) Trip ITE rrE Land Use Trip % New Length Net New Trips per Impact Fee Per Unit @ $ Code Category Rate' Trips' Factor4 Unit of Measure 763.66 per Trip 110 Light Industrial 0.98 100% 1.59 1.56 1,000 sq ft 1.19 per square foot 140 Manufacturing 0.74 100% 1.59 1.18 1,000 sq ft 0.90 per square foot 151 Mini -warehouse 0.26 100% 1.59 0.41 1,000 sq ft 0.32 per square foot 210 Single family 1.01 100% 1.09 1.10 dwelling 840.72 per dwelling unit House 220 Apartment 0.62 100% 1.15 0.71 dwelling 544.49 per dwelling unit 230 Condominium 0.54 100% 1.15 1 0.62 dwelling 474.24 Der dwellina unit 240 Mobile Home 0.56 100% 1.09 0.61 dwelling 466.14 per dwelling unit 310 Hotel 0.61 100% 1.25 0.76 room 1 582.29 per room 320 Motel 0.47 100% 1.25 0.59 room 448.65 per room 420 Marina 0.19 100% 0.97 0.18 berth 140.74 per boat berth 430 Golf course 0.30 100% 1.00 0.30 acre 229.10 per acre 444 Movie Theater 3.80 100% 0.72 1 2.74 1,000 sq ft 1.36 per square foot 492 Racquet club 1.83 100% 0.97 1.78 1,000 sq ft 3.58 per square foot 530 High School 1.02 100% 0.62 0.63 1,000 sq ft 0.48 per square foot S60 Church 0.66 100% 1.15 0.76 1,000 sq ft 0.58 pe square foot 610 Hospital 0.92 100% 1.56 1.44 1,000 sq ft 1.10 per square foot 620 Nursing home 0.20 100% 0.87 0.17 bed 132.88 per bed 710 General Office 1.49 100% 1.59 1 2.37 1,000 sq ft 1.81 per square foot 720 Medical office 100% 1.50 5.49 1,000 sq ft 4.19 per square foot 820 Shopping Center 3.74 81% 0.40 1.21 1,000 sq ft 0.93 per square foot 832 Restaurant: sit- 10.86 56% 1.06 6.45 1,000 sq ft 4.92 per square foot down 833 Fast food, no 26.15 52% 0.62 8.43 1,000 sq ft 6.44 per square foot drive -up 834 Fast food, wl 33.48 51% 0.62 10-59 1,000 sq ft 8.08 per square foot drive -up 844 Gas station 14.56 60% 0.53 1 4.63 purnp 3,535.82 per vfp 845 Gas station 13.38 47% 0.53 3.33 pump 2,545.26 per vfW w/convenience 8SO Supermarket 11.51 55% 0.65 4.11 1,000 sq ft 3.14 per square foot 851 Convenience 53.73 39% 0.40 8.38 1,000 sq ft 6.40 per square foot market-24 hr 912 Drive-in Bank 1 54.771 51%1 0.47 1 _1 3.13 1,000 sq ft 10.03 per square foot 2 ITE Trip Generation (6th Edition): 4-6 PM Peak Hour Trip Ends 3 Excludes pass -by trips: see 'Trip Generation Handbook: An ITE Proposed Recommended Practice" (1988) Ratio to average ttip length. vfp: vehicle fueling position Henderson, Young & Company City of Edmonds, Washington April 15, 2003 ,Page 18 TrIMP M Generation Handbook Second Edition An ITE Recommended Practice June 2004 Institute of Transportation Engineers = = = = M = = = = = = Ml = M M = M = = M Table 5.30 0 Pass -By Trips and Diverted Linked Trips Weekday, p.m. Peak Period CD Land Use 945—Gasoline/Service Station with Convenience Market 0 =3 SIZE (1,000 SQ. VEHICLE FUELING WEEKDAY NO. OF TIME PRIMARY NON -PASS- DIVERTED LINKED PASS -BY ADJ.STREET PEAK HOUR 0 FF. GFA) POSITIONS LOCATION SURVEY DATE INTERVIEWS PERIOD TRIP BY TRIP TRIP (%) TRIP VOLUME SOURCE 0 QL 0.8 8 Louisville area, KY 1993 83 4:00-6:00 p.m. 8 — 40 52 4,965 Barton-Aschman Assoc. m 0.6 8 Louisville, KY 1993 60 4:00-6:00 p.m. 20 — 27 53 1,491 Barton-Aschman Assoc. C2: 0 :3 0.7 10 Louisville, KY 1993 n/a 4:00-6:00 p.m. 19 — 24 57 1,812 Barton-Aschman Assoc. 1 Z? 0.7 8 Louisville area, KY 1993 n/a 4:00-6:00 p.m. 7 — 21 72 2,657 Barton-Aschman Assoc. a, 0.7 10 Louisville area, KY 1993 ri/a 4:00-6:00 p.m. 16 — 29 55 2,657 Barton-Aschman Assoc. CA 0.8 8 Silver Spring, MD 1992 36 4:00-6:00 p.m. 14 — 19 67 3,095 RBA 0.4 8 Derwood, IVID 1992 46 4:00-6:00 p.m. 11 — 43 46 3,770 RBA 2.1 8 Kensington, MD 1992 31 4:00-6:00 p.m. 13 — 35 52 1,785 RBA 1 8 Silver Spring, IVID 1992 35 4:00--6:00 p.m. 3 — 43 54 7,080 RBA Average Pass -By Trip Percentage: 56 mammm a nn" mm ==do M am an � � � � � — — — — — - llllk� mum w" go" mum wilM mum mom MUM Los MUM LPN APBU 111P __r� CNI (D D CD 511 0 =3 :E Q_ CT 0 0 217 CL m OL 01 M Table 5.20 Pass -By Trips and Diverted Linked Trips Weekday, p.m. Peak Period Land Use 912—Drive-in Bank SIZE (1,000SO. FT. GFA) LOCATION WEEKDAY SURVEY DATE NO. OF INTERVIEWS TIME PERIOD PRIMARY TRIP (%) DIVERTED NON -PASS- LINKED BY TRIP TRIP (%) PASS -BY TRIP N ADJ. STREET PEAK HOUR VOLUME SOURCE 16.0 Overland Park, KS Dec. 1988 20 4:30-5:30 p.m. 55 — 30 15 n/a n/a 3.3 Louisville area, KY Jul. 1993 n/a 4:00-6:00 p.m. 22 — 30 48 2,570 Barton-Aschman Assoc. 3.4 Louisville area, KY Jul. 1993 n/a 4:00--6:00 p.m. 22 — 14 64 2,266 Barton-Aschman Assoc. 3.4 Louisville area, KY Jul. 1993 75 4:00-6:00 p.m. 11 — 32 57 1,955 Barton-Aschman Assoc. 3.5 Louisville area, KY Jun. 1993 53 4:00-6:00 p.m. 32 — 21 47 2,785 Barton-Aschman Assoc. 6.4 Louisville area, KY Jun. 1993 66 4:00-6:00 p.m. 20 — 27 53 2,610 Barton-Aschman Assoc. Average Pass -By Tirip Percentage: 47 Table 5.21 Pass -By Trips and Diverted Linked Trips Weekday, p.m. Peak Period Land Use 931 —Quality Restaurant SIZE DIVERTED ADJ. STREET (1,000SO. WEEKDAY NO. OF TIME PRIMARY NON -PASS- LINKED PASS -BY PEAK HOUR SEATS Fr. GFA) LOCATION SURVEY DATE INTERVIEWS PERIOD TRIP (%) BY TRIP (%) TRIP (%) TRIP (%) VOLUME SOURCE 240 12 Louisville area, KY Jul. 1993 38 4:00-6:00 p.m. 36 — 38 26 4,145 Barton-Aschman Assoc. n/a 8 Odando,FL 1992 168 4:00-8:00 p.m. — 55 — 45 n/a TPD Inc. n/a 8.8 Odando,FL 1992 84 2:00-6:00 p.m. 40 — 16 44 n/a TPD Inc. n/a 6.5 Orlando, IFL 1995 173 2:00-6:00 p.m. — 38 62 n/a TPD Inc. Average Pass -By Trip Percentage: 44 Tro 1p eneratimon Handbook An ITE Proposed . Recommended Practice N October 1998 Institute of Transportation Engineers ,= aiiiiii, �- W--' on Nam am M W 911111 ON 011111111 sibm M W W ire" Table 5.14 Pass -By Trips and Diverted Linked Trips Weekday, P.m. Peak Period Land Use 845—Gasoline/Service Station with Convenience Market SIZE (1,OOOSQ. FEET GFA) VEHICLE FUELING POSITIONS LOCATION WEEKDAY NO. OF TIME PRIMARY NON -PASS- SURVEY DATE INTERVIEWS PERIOD TRIP (%) BY TRIP (%) DIVERTED LINKED TRIP (%) PASS -BY TRIP (%) ADJ. STREET PEAK HOUR VOLUME SOURCE .8 8 Louisville area, KY 1993 83 4-6 Pm. 8 - 40 52 4,965 Barton-Aschman Assoc. .6 8 Louisville, KY 1993 60 4-6 Pm. 20 - 27 53 1,491 Barton-Aschman Assoc. .7 10 Louisville, KY 1993 n/a 4-6 Pm. 19 - 24 57 i,812 Barton-Aschman Assoc. .7 8 Louisville area, KY 1993 n/a 4-6 P.m. 7 - 21 72 2,657 Barton-Aschman Assoc. .7 10 Louisville area, KY 1993 n/a 4-6 P.M. 16 - 29 55 2,657 Barton-Aschman Assoc. .8 8 Silver Spring, MID 1992 36 4-6 P.M. 14 - 19 67 3,095 RBA .4 8 Derwood, MID 1992 46 4-6 P.m. 11 - 43 46 3,770 RBA 2.1 8 Kensington, MID 1992 31 4-6 RM. 13 - 35 52 1,785 RBA 1 8 Silver Spring, . MID 1992 35 4-6 Pm. 3 - 43 54 7,080 RBA Average Pass -By Trip Percentage: 56 3 1 Table 5.26 Pass -By Trips and Diverted Linked Trips Weekday, P.m. Peak Period Land Use 912—Drive-in Bank SIZE (1,000SO. FEET GFA) LOCATION WEEKDAY SURVEY DATE NO. OF INTERVIEWS TIME PERIOD PRIMARY TRIP (%) DIVERTED NON -PASS- LINKED BY TRIP (%) TRIP PASS -BY TRIP (%) ADJ.STREET PEAK HOUR VOLUME SOURCE 16.0 Overland Park, KS Dec. 1988 20 4:30-5:30 P.m. 55 - 30 15 n/a n/a 3.3 Louisville area, KY Jul. 1993 n/a 4-6 RM. 22 - 30 48 2,570 Barton-Aschman Assoc. 3.4 Louisville area, KY Jul. 1993 n/a 4-6 P.m. 22 - 14 64 2,266 Barton-Aschman Assoc. 3.4 Louisville area, KY Jul. 1993 75 4-6 Pm. 11 - 32 57 1,955 Barton-Aschman Assoc. 3.5 Louisville area, KY Jun. 1993 53 4-6 P.m. 32 - 21 47 2,785 Barton-Aschman Assoc. QP\ 6.4 Louisville area, KY Jun. 1993 66 4-6 RM. 20 - 27 53 2,610 Barton-Aschman Assoc. Average Pass -By Thp Percentage: 47 27 6) = = = m m = = = = = = = = m = = m = = 0 bQt� ST"M W 2 �n �y P­ SITE/PROJECT INFORMATION SITE PLAN z 0 Z z < LL o < Z < a) LU am z IL w I — FA J.b A, rk_ m CJ.,k 'p 'Mr Al.0 Bank of WA - Application #bld2006.1048 Pagel of2 Mike Perry . ........... ... ... .. ...... . ....... ........ ............ From: McConnell, Jeanie [Mcconneli@ci.edmonds.wa.us] Sent: Tuesday, November 21, 2006 3:59 PM To., mperry@dimensionsarch.com Cc: Harrison, Marie; McConnell, Jeanie Subject: Bank of WA - Application #bld20061O48 Good afternoon Mike, I am forwarding to you comments from our Traffic Engineer, Don Sims, in review of the Traffic Impact Analysis worksheet. The remaining Engineering Division comments will be sent following the Hearing Examiner decision and subsequent appeal period. Regards, Jeanie McConnell Engineering Technician 425-771-0220, exit 1338 FAX - 425- 771-0221 mcconnell@dedmonds. waus —Original Message From: Sims, Don Sent, Monday, November 20, 2006 1:37 PM To: McConnell, Jeanie Subject: RE: Bank of WA Jeanie, I reviewed the submitted Traffic Impact Analysis Worksheet for the subject project and have the following comments: 1) The worksheet is incomplete. Per #E82 Traffic Impact Analysis Requirements, their proposal exceeds 25 peak -hour trips generated and therefore they need to complete all sections (11 -7). To that end (and because this proposal is a bit controversial from a land use perspective and we'll need to be able to quantify the traffic impacts to the downtown area for the city council), they need to at3alyze the existing inters 2ictions at 5th/Dayton, 5th/Walnut, 5th/Main, 3rd/Dayton & 4th/Dayton. Their traffic consultant will need to do a with a-n-d-w7i ffout project JT-T-7ortfiese intersections using the methodology outlined in the Highway Capacity Manua_T_Tfffi-L5yj c an ysis have any questions, they can contact me. 2) 1 do concur with their mitigation fee they came up with on page 2 (wrong location to calculate IL.), however, being consistent and carrying everything out to two decimal points, I come up with a fee of $7392.23 vs. their $7147.86. Don Sims, P.E. City Traffic Engineer Chy of Edmonds 11/22/2006 do. jj��, 00 A,,( 40 KNOW Zoe mom MOM COSTM I MKC mm mmw Pon 0 man" rm Mam.n APPROVED AS NOTED I BY ENGINEERING , :11rm MW-�-- 3f �r m nmx IMA mmu Date: 0 64CE, -5 -W, We F— ff� r 5TH AVENUE SOUTR nmm awpWand— AM admip.= a= M*dowft Of A PJ WILCOX CONSI I ON INC. VEHICULAR & PEDESTRIAN TRAFFIC ROUTING PLAN DURING CONSTRUCTION for ASMINGTOR *Qutpll4Y o**1 sionki"go APPROVED BY ENZNEERIHIIJ� rn V!�' 0 A q 00 00 DOS7ING OFFICE SUB.OING AT PROPERTY UNE < .................. m 0 ��6'17� 001po 70 (POO On"MG APARTMElff BUILDING AT PROM IV LINE —CONTRACTOR STAGING AREA & ON -SITE PARKING AS ROOM ALLOWS. OVERFLOW EMPLOYEE PARKING TO BE AT WILCOX CONSTRUCTION INC.'s PRIVATE LOT LOCATED TO THE SOUTH OFF OF THE ALLEY '04, # it THE BANK OF WASHINGTON CONSTRUCTION JOB TRAIIIER '1 2725 SF. J. - TO BE RELOCATED ON SITE As REOUIRED DURING 11 SLABIELE1465.10 CONSTRUCTION ACTIVITIE . S ARCH ELEV 100.0 _�­ ..................... / i i i _—L --------- J ---------- J -EXISTING BUS STOP FOR COMMUNITY TRANSIT TO BE TEMPORARELY RELOCATED TO DAYTON STREET FOR THE DURATION OF THE CONSTRUCTION PROCESS OF THE *THE BANK OF WASHINGTON" PROJECT. THE REMOVED AND RELOCATED BY COMMUNITY TRANSIT GC TO PROVIDE & INSTALL TEMPORARY PAVEMENT MARKINGS TO CITY OF EDMONDS STANDARDS AS TO PROVIDE (3) TEMPORARY PARALLEL -ON-STREET- PARKING STALLS ON 5TH AVENUE SOUTH TO REPLACE 5TH AVENUE SOUTH THE (3) PARALLEL PARKING STALLS TEMPORARELY CONVERTED TO THE COMMUNITY TRANSIT BUS LANE ON DAYTONSTREET MAIN CONSTRUCTION PERIOD VEHICULAR & PEDESTRIAN TRAFFIC ROUTING a Noe TEMPORARY COMMUNITY TRANSIT BUS STOP TO BE RELOCATED FROM 5TH AVENUE SOUTH TO THIS LOCATION ON DAYTON STREET FOR THE DURATION OF THE CONSTRUCTION PROCESS FOR 'THE BANK OF WASHII,IGTON' APPROXIMATELY 22-WEEKS - PER APPRO�AL FROM DANA OSBORN OF COMMUNITY I TANsIT Lu LLJ cn z 0 it PEDESTRIAN PATHWAY TO REMAIN CLEAR AT A�L TIMES COLD PATCH TO BE USED TO TEMPORARELY INFILL EXISTING PLANTERS AND CORRECT ANY HOLES! DIPS, OR UNEVEN SURFACES AS NEEDED TO MAINTAIN SMOOTH EVEN SURFACE FOR PEDESTRIAN TRAFFIC. PEDESTRIAN PATHWAY TO MAINTAIN AN UNOBSTRUCTED CLEAR WIDTH OF 3*-8'AT ALL TIMES. TEMPORARY CONSTRUCTION FENCIN TEMPORARY COMMUNITY TRANSIT BUS STOP LANE F77777777�1 PEDESTRIAN PATH OF TRAVEL - EXISTING SIDEWALK NARROWED TO 44" CLEAR MINIMUM AT ALL TIMES TRUCK HAUL ROUTE - TRUCK DELIVERIES TO SITE WILL BE ROUTED FROM DAYTON STREET (EASTBOUND) AND TRUCKS WILL EXIT THE SITE RIGHT (SOUTH) ONTO 5TH AVENUE S. BOTH via SR104 gf,cf-INED 0% 2 2 207 etAGjtApf%tlG DIvISION THE BANK OF WASH I NGTOIC����� MAIN CONSTRUCTION PERIOD - DAYTON STREET & 5TH AVE;UE SOUTH SIDEWALKS TO REMAIN 'OPEN- JUNE 12. 2007 0 r If 30 w NORTH omm mms r-ir-c 0 WILCOX CONSTRUCTION INC. 234 - 5TH Ave SE Edmnds' WasWngton 98020 Ora" Date: June 12. 2007 Drawn By-. T. Falk Appro�od By. T. Folk Project No. 07-3594 VEHICULAR & PEDESTRIAN TRAFFIC ROUTING PLAN VPR1.1w V!A 0 'A 00 00STING OMCE BUWNG AT PROPERTY LINE rn 0 ,-60-po 70, EXISTING APARTMENT 81,111U)NO AT PROPERTY LUE INSTALL SIGN ON TEMPORARY CONSTRUCTION FENCE FABRIC "SIDEWALK CLOSED - USE OTHER SIDE' �CONTRACTOR STAGING AREA & ON-SrrE PARKING AS ROOM ALLOWS. OVERFLOW EMPLOYEE PARKJNG TO BE AT WILCOX CONSTRUCTION INC.'s PRIVATE LOT LOCATED TO THE SOUTH OFF OF THE ALLEY # 000 # 4�1 THE BANK OF If CONSTRUCTION JOB TRAJ R WASHINGTON 2725 SF. - TO BE RELOCATED ON S As REQUIRED DURING SLAB ELEV; 65.10 CONSTRUCTION ACTIVITIES ARCH ELEV: 10D.0 cd I 4STRUCTION ZONE W _# ZONE < ............... 1 PEDESTRIAN PATHWAY TO REMAIN CLEAR AT ALL TIMES. COLD PATCH TO BE USED TO TEMPORARELY INFILL EXISTING PLANTERS AND CORRECT ANY HOLES, DIPS, OR UNEVEN SURFACES AS NEEDED TO MAINTAIN SMOOTH EVEN SURFACE FOR PEDESTRIAN TRAFFIC. PEDESTRIAN PATHWAY TO MAINTAIN AN UNOBSTRUCTED CLEAR WIDTH OF X-r AT ALL TIMES. 5TH AVENUE SOUTH DAYTON STREET OFF -SITE IMPROVEMENTS VEHICULAR & PEDESTRIAN TRAFFIC ROUTING I ADJACENT TO ALLEY DAYTON STREET THAT READS "SIDEWALK CLOSED - USE OTHER SIOF —TEMPORARY COMMUNITY TRANSIT BUS STOP TO BE RELOCATEDFROM 5TH AVENUE SOUTH TO THIS LOCATION ON DAYTON STREET FOR THE DURATION OF THE CONSTRUCTION PROCESS FOR 'THE BANK OF WASHINt.13TON' APPROXIMATELY 22-WEEKS - PER APPROVAL FROM DANA OSBORN OF COMMUNITY TRANSIT BE V FACE w w w Isse, 0 kRY CONSTRUCTION FENCING TO 4DED TO -A 4'BEYOND FRONT CURB AS TO SECURE WORK AREA rHE OFF -SITE IMPROVEMENTS ON STREET z 0 INSTALL SIGN ON TEMPORARY CONSTRUCTION FENCE FABRIC THAT READS - *SIDEWALK CLOSED - USE OTHER SIDE' OFF -SITE IMPROVEMENTS DONE SEPERATELY PEDESTRIAN PATHWAY TO REMAIN UNOBSTRUCTED AT CORNER TO ALLOW FOR NORTHBOUND PEDESTRIAN TRAFFIC TEMPORARY CONSTRUCTION FENCING TEMPORARY COMMUNITY TRANSIT BUS STOP LANE PEDESTRIAN PATH OF TRAVEL - EXISTING SIDEWALK NARROWED TO 44" CLEAR MINIMUM AT ALL TIMES TRUCK HAUL ROUTE - TRUCK DELIVERIES TO SITE WILL BE ROUTED FROM DAYTON STREET (EASTBOUND) AND TRUCKS WILL EXIT THE SITE RIGHT (SOUTH) ONTO 5TH AVENUE S. BOTH via SR1 04 THE BANK OF WASHINGTON DAYTON STREET OFF -SITE IMPROVEMENTS - SOUTH SIDEWALK CLOSED JUNE 12, 2007 r tr w 3W NORTH aww wme ir-w-o 0 WILCOX CONSTRUCTION INC. 234 - 5TH Ave SE Edmonds, Washington 98020 D�m Dam: June 12. 2007 Drawn By: T. Falk Apprwed By: T. Faik Project No. 07-3594 VEHICULAR & PEDESTRIAN -1 TRAFFIC ROUTING PLAN VPR 2.1 rn - CONTRACTOR STAGING AREA & ON-STTE PARKING AS ROOM ALLOWS OVERFLOW EMPLOYEE PARKING TO BE AT WILCOX CONSTRUCTION INC.'s PRIVATE LOT LOCATED TO THE SOUTH OFF OF THE ALLEY V�A 0 A 00 %p 00 MOSTING OFFICE BUILDING AT PROPERTY UNE CONSTRUCTION JOB TRAILER - TO BE RELOCATED ON SITE AS REQUIRED DURING CONSTRUCTION ACTIVITIES INSTALL SIGN ON TEMPORARY CONSTRUCTION FENCE FABRIC THAT READS - 'SIDEWALK CLOSED - FOLLOW DETOUR' CONSTRUCTION 9 :% N :%, 11L TEMPORARY CONSTRUCTION FENCING TO BE EXTENDED TO -/- 4'BEYOND FRONT FACE OF CURB AS TO SECURE WORK AREA DURING THE OFF -SITE IMPROVEMENTS ON V?.% 0 u"-!+ 'U0, -p 00 70 ��d 00 DOSIM APAR7MEIfT B1JMDW AT PROPEM UK Fn DELIVERY TRUCK ROUTE ENTER AND EXIT FROM DAYTON STREET ONLY DURING STH AVENUE SOUTH OFF -SITE IMPROVEMENTS VIA SR104 5TH AVENUE SOUT THE BANK OF WASHINGTON 2725 SF. SLAB ELEV; 65.10 ARCH ELEV. 100.0 ----- i ---------- i z�� u : Cd i —.Jcd 5TH AVENUE SOUTH OFF -SITE IMPROVEMENTS VEHICULAR & PEDESTRIAN TRAFFIC ROUTING Woltz PEDESTRIAN ACCESS ON 5THAVENUE SOUTH ALONG "THE BANK OF WASHING TON"PROPERTY TO BE SHUT DOWN AND RE-ROUTED TO THE EAST SIDE OF THE STREET DURING DEMOLITION OF EXISTING CURB, GUTTER, & SIDEWALKS (ASSUMING THE"OLD MILL TOWN"PROJECT HAS PROGRESSED TO A POINT r WHERE THE SIDEWALKS CAN BE RE -OPENED) - TIMING TO BE COORDINATE�l DIRECTLY WITH THE CITY OF EDMONDS PRIOR TO SHUTDOWN TEMPORARY COMMUNITY TRANSIT BUS STOP TO BE RELOCATED FROM 5TH AVENUE SOUTH TO THIS LOCATION ON DAYTON STREET FOR THE DURATION OF THE CONSTRUCTION PROCESS FOR 'THE BANK OF WASHINGTON' APPROXIMATELY 22-WEEKS - PER APPROVAL FROM DANA OSBORN OF COMMUNITY TRANSIT 000N Lu Lu cf) Z 0 INSTALL SIGN ON TEMPORARY CONSTRUCTION FENCE FABRIC THAT READS - 'SIDEWALK CLOSED - USE OTHER SIDE' ltmru�T brOP` SIGN (2ND STOP SIGN) ADJACENT TO VEHICULAR PATH OF TRAVEL AS A RESULT OF LINE OF SIGHT OBSTRUCTION CREATED BY TEMPOA� CONSTRUCTION FENCE (3) TEMPORARY PARALLEL -ON-STREEr "--PEDESTRIAN PATH OF TRAVEL TO BE PARKING STALLS ON 5TH AVENUE SOUTH TEMPORARELY CLOSED DURING NEW TO REPLACE THE (3) PARALLEL PARKING STORM CONNECTION. CURB & GUTTER. AND STALLS TEMPORARELY CONVERTED TO THE SIDEWALK IMPROVEMENTS - NORTH AND 56MM M 0W11YT"4SIf 8US_0Uq9_0N_ SOUTHBOUNDPED — AN VICT61BE- DAYTON STREET TO BE REMOVED PRIOR TO ROUTED TO EAST SIDE OF SIh AVENUE & DURING OFF -SITE IMPROVMENTS ON 5M SOUTH. TIMING OF Sth AVENUE SOUTH AVENUESOUTH OFF -SITE IMPROVEMENTS TO BE COORDINATED WITH THE CITY OF EDMONDS PERMANENT COMMUNITY TRANSIT BUS AND THE OLD MILL TOWN PROJECT AS TO STOP To BE RELOCATED BACK TO NEW CONTINUOUSLY PROVIDE A NORTH AND LOCATION ON Sth AVENUE SOUTH UPON SOUTHBOUND MEANS OF PEDESTRIAN COMPLETION OF OFF -SITE IMPROVEMENTS TRAVEL. TO Sth AVENUE SOUTH TEMPORARY CONSTRUCTION FENCING TEMPORARY COMMUNITY TRANSIT BUS STOP LANE PEDESTRIAN PATH OF TRAVEL - EXISTING SIDEWALK NARROWED TO 44" CLEAR MINIMUM AT ALL TIMES TRUCK HAUL ROUTE - TRUCK DELIVERIES TO SITE WILL BE ROUTED FROM DAYTON STREET (EASTBOUND) AND TRUCKS WILL EXIT THE SITE LEFT (WESTBOUND) ONTO DAYTON STREET BOTH via SR104 RECEIVEE) JU14,2 Z 2w? ENGINEERING DIVISION THE BANK OF WASHINGTON 5TH AVENUE SOUTH OFF -SITE IMPROVEMENTS - WEST SIDEWALK REROUTED TO EXISTING TEMPORARELY UNOCCUPIED BUS LANE JUNE 12, 2007 NORTH vim mu f-w-w 3a WILCOX CONSTRUCTION INC. 234 - 5TH Aw SE Edmnds, Wa.hngton 98M Drs� Date: June 12, 20D7 Drawn By: T. Falk Approved By: T. Falk Project No. 07-3594 VEHICULAR & PEDESTRIAN L \� 1% TRAFFIC ROUTING PLAN VPR 3.1 POST SIGN AT SOUH ENTRANCE TO ALLEY T14AT READS 'ALLEY CLOSED TO THROUGH TRAFFIC - LOCAL TRAFFIC ONLY' T11 0 "A V 0 00 EXISTING OFFICE BIJIILDING AT PROPERTY LINE END OF CONSTRUCTION CONSTRUCTION ZONE ZONE < ............... TEMPORARY CONSTRUCTION FENCING TO BE UTILIZED DURING THE DAY/CONSTRUCTION ACT VITIES TO ENCLOSE CONSTRUCTION AREA - 1 r TEMPORARY CONSTRUCTION FENCING WILL BE REMOVED FROM ALLEY R.O.W. AND ALL OPENED EXCAVATION AREAS WILL BE COVERED NTH STEEL PLATES AT THE END OF EACH SHIFT M I I 1 A L.h -P 00 Irb-1 6100 EXISMG APAN111111DIT BULMO AT PROPSM UK CONTRACTOR STAGING AREA & ON -SITE PARKING AS ROOM ALLOWS. OVERFLOW EMPLOYEE PARKING TO BE AT WILCOX CONSTRUCTION INC.'s PRIVATE LOT LOCATED TO THE SOUTH OFF OF THE ALLEY THE BANK OF WASHINGTON CONSTRUCTION JOB TRAI E��R R 2725 SF. - TO BE RELOCATED ON SITE AS REQUI DURING SLAB ELEV: 65.10 CONSTRUCTION ACTIVITIES ARCH ELEV. 100.0 Cd 9 EXISTING BUS STOP FOR COMMUNITY TRANSIT TO BE TEMPORARELY RELOCATED TO DAYTON STREET FOR THE DURATION OF THE CONSTRUCTION PROCESS OF THE'THE BANK OF WASHINGTOW PROJECT. THE EXISTING SIGN, BENCH, & TRASH RECEPTACLE TO BE REMOVED AND RELOCATED BY COMMUNITY TRANSIT 5TH AVENUE SOUTH ALtkEY WEST OF PROPERTY OFF -SITE IMPROVEMENTS 11 VEHICULAR & PEDESTRIAN TRAFFIC ROUTING POST SIGN AT NORTH ENTRANCE TO ALLEY THAT READS - 'ALLEY CLOSED TO THROUCMT TRAFFIC' LOCAL TRAFFIC oNLr TEMPORARY COMMUNITY TRANSIT BUS STOP TO BE RELOCATED FROM STH AVENUE SOUTH TO THIS LOCATION ON DAYTON STREET FOR THE DURATION OF THE CONSTRUCTION PROCESS FOR 'THE BANK OF WAS APP4HOIN�GTOWOAPPROXIMATELY 22-WEEKS - PER VALFR M DANA OSBORN OF COMMUNITY I­ UJ UJ (n z 0 PEDESTRIAN PATHWAY TO REMAIN CLEAR AT ALL TIMES. COLD PATCH TO BE USED TO TEMPORARELY INFILL EXISTING PLANTERS AND CORRECT ANY HOLES! DIPS, OR UNEVEN SURFACES AS NEEDED TO MAINTAIN SMOOTH EVEN SURFACE FOR PEDESTRIAN TRAFFIC. PEDESTRIAN PATHWAY TO MAINTAIN AN I UNOBSTRUCTED CLEAR WIDTH OF T-W AT ALL TIMES. TEMPORARY CONSTRUCTION FENCING TEMPORARY COMMUNITY TRANSIT BUS STOP LANE PEDESTRIAN PATH OF TRAVEL - EXISTING SIDEWALK NARROWED TO 44" CLEAR MINIMUM AT ALL TIMES TRUCK HAUL ROUTE - TRUCK DELIVERIES TO SITE WILL BE ROUTED FROM DAYTON STREET (EASTBOUND) AND TRUCKS WILL EXIT THE SITE RIGHT (SOUTH) ONTO 5TH AVENUE S. BOTH via SR1 04 THE BANK OF WASHINGTON ALLEY WEST OF PROPERTY OFF -SITE IMPROVEMENTS - ALLEY TO BE CLOSED DURING OFF -SITE IMPROVEMENTS JUNE 12, 2007 0 9 w 3w NORTH amm mm ir-w-w 0 WILCOX CONSTRUCTION INC. 234 - 5TH Ave SE Edmonds. Washington 98020 D�n Date: June 12. 2007 D . By: T. Falk Approved By: T. Falk Project No. 07-3594 VEHICULAR & PEDESTRIAN TRAFFIC ROUTING PLA VPR 4.1 Uji 18 <j2-L 1111�7 wz