Loading...
20209 87TH AVE W.PDFIIIIIIIIIIII 8268 20209 87TH AVE W I IF 890 - 199 - City of Edmonds RI WAY CONSTRUCTION '0%kov wREET 17IMPERmIT Permit Number. t?r) _091,:� Issue Date:__�" A. Address or Vicinity of Construction: - 2ngnq gy Ay w 9515948 B. Type of Work (be specific): Install New Serv:Lce C. Contractor: Wasqhingtnn Nat-ural GAn Mailing Address: 1122 75 St SW -Everett State License #: 98203 D. Building Permit # (if applicable): Contact: Fra-rik Swart Pho ne: 447-3284 Liability Insurance: _ Bond: $ Side Sewer Permit # (if applicable): E. Commercial EJ Subdivision El City Project [I Utility (PUD, GTE, WNG, CABLE, WATER) Multi -Family [] Single Family F] Other INSPECTOR: INSPECTOR: V\J F. Pavement or Concrete Cut : 0 Yes [JNo G. Size of Cut: — x — H. Chargq,$ APPLICANT TO READ AND SIGN INDEMNITY: Applicant understands and by his signature to this application, agrees to hold the City ofEdmonds harmless from injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds, or any of its departments or employees, including or not limited to the defense ofany legalproceedings including defense costs, and attorney fees by reason ofgranting thispermit. THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE'YEAR F04LOWING THE FINAL INSPECTION AND ACCEPTANCE OF THE WORK ESTIMATED RESTORATION FEES WILL BE HELD UNTIL THE FINAL SPREET PATCH IS COMPLETED BY CITY FORCES, AT WHICH TIMEA DEBIT OR CREDIT WILL BEPROCESSED FOR ISSUANCE TO THEAPPLICANT. Construction drawing of proposed work required with permit application. A 24 hour notice is required for inspection; Please call the Engineering Division, 771-0220. Work and material is to be inspected during progress and at completion. Restoration is to be in accordance with City Codes. Street shall be kept clean at all times. Traffic Control and Public Safety shall be in accordance with City regulations as required by the City Engineer. All street cut ditches shall be patched with asphalt or City approved material prior to the end of the working day; NO EXCEPTIONS. Ihave read the above statements and understand thepermit requirements and thepink copy of thepermit will be available on site at all times Or4rtgj5ection pupposes. Signature: Date: 5-5-95 (Contractor or Agent) CALL DIAL -A -DIG PRIOR TO BEGINNING WORK FOR CITY USE ONLY APPROVED BY: a V'J TIME AUTHORIZED: VOID AFTER YS SPECIAL CONDITIONS: COMMENTS: DATE: RIGHT OF WAY DEPOSIT DISRUPTION FEE/FUND 111: RESTORATION FEE: PERMIT FEE: 3 L) , OL) TOTAL FEE: RECEIPT FEE: ISSUED BY: NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE Eng. Div. 1994 FIELD INSPECTION NOTES Comments: Diaaram.: (Fund 111 - Route copy to Street Dept.) CONTRACTOR CALLED FOR INSPECTION 0 YES Partial Work Inspection by P.W.: Work Disapproved By: Date: FINAL APPROVAL BY: Date: E-] NO Washington INIatural Gas A W,),Jv xjjrvi F n(4cry U , 4 � yr,/ . �j Watermain depth gas main Addendum to: City of Edmonds Right of Way Permit Application Submitted by: Mariamne Kingsbury 'Engineering Aide Washington Natural Gas 1356-7500 X7596 2-o2- ;Z->T- VQ N 2JD W Q0 C-OTS 19S I ee Key: -W- Water -G- Gas -SS- Sewer -& Water hydrant 0 Water valve Washington Naltiral Gas Conipan%, 1122 7501 Strect S.\V.. h-crett. Washington 98203. (206) 355-3331 NOTICE: —ra currary. -No'*War-rantro tached The information'shown on the at map(s) was compiled for use by the CitY Of Edrnonds� its Employees and Consultants. Th..e City of *Edm.onds does not. warrant the accuracy of anything set forth on t * hese rnap(�_). Any person or entity -requesting a copy should conduct an independent m-ation shown on inquiry regarding the infor ff�e -map(s), including, but not limited to, th'e lociation of any sew-er stub shown, Such sewer stubs may or may, not exist and may or may not exist at the location shown. .As nor its Neither the city of Erlmond empl-o-yee-s o-r office-rs -shal] be 11a-b-Fe for the information given on this map(s), nor for any one representation provided based upon said map(s). APPLICATION The City of Edmonds for SlIDE SEWER PERMIT 1 5c, ,,!NEW CONSTRUCTION REPAIRS EASEMENT No . .......................................... OWNER.................. ............................................. CONTRACTOR ...................... ............................................................. PERMIT No. 91 . Is -7 -kA v e- A.DDRESS .................................. .......................................................... A ....... LEGAL DESCRIPTION: LOT No. — ........................................... BLOCK No . ............................................. NAMEOF ADDITION ------------------------------------------ Le, -2 _.&. ' ------------- ............. - T -------------------------------------------- 0 Approved: DATE ....... ��-5 .......... B Y�- - �4 ------ 74� :I. r) -4 0 0 �3 0 0 n 0 0 M rt M z 91 0 rt M Q 01 I WININE11111 111101 IN MININ11 mining !!III _q M rn ,C) M AD M M 0 M M a) 07 0 0 q V > z �3 0 tri X 0 a 0 z -3 H tq z 0 0 r_ q 00 VQ 0 e1N (D C� M 0 00 DO r1l r—r DO C) 'h h (D (D cn 0 (D )0 )0 ID -t (D Do0 (D 11U� 1 ie) C:- C_ I F'j 0 �4 0 CITY OF EDMONDS aj — WATER -SEWER DEPARTMENT is ready for inspection. (No Inspec CIVIC CENTER C I PRospect 6-1107 when work SIDESEWER PERMIT Ilona Saturday, Sunday or holidays.) N2 -01334 AMPLE SS .................................................. 20209 - 87th Avenue West ...................................................................................................................................................... OWNER ........................ 13mokenshire ........................................ CONTRA OR ....... $. .�-Safe CT 4P Permission is granted ..... �bAIY ... Z? .................... 1 19 ... ��, for ........................ days to REPAIR or CONNECT a side sewer with City Sewers in accordance with application on file and governing or'dinances. ATTENTION IS CALLED TO THE FOLLOWING: NOTE No. I —The owners of the property may obtain a permit to construct sew er Inside Property line. A licensed Side Sewer Contractor must be employed to construct side sewer In street area. Do not cover any portion of sewer before it has been Inspected. NOTE No. 2—Obtain full information regarding Ordinance 11.16.030 and Regulations governing side sewers when you get permit. NOTE No. 3—Top of side sewer must have at least 30 Inches coverage at property line and 12 Inches Inside property line; minimum grade of 2%. No bonds in grade sharper than % will be permitted. P' No. 4—Trenches in street must be water settled and surface of street restored to original condition. Contractors shall be responsible for failure due to Improper work which may develop within one year of completion. NUTE No. S—It Is unlawful to alter or do any other work than Is provided for In the permit, or to do any work on the main sewer or Its appur- tenances except to Insert the pipe into the wye. I—, 0" M