20416 79TH AVE W.PDFIIIIIIIIIIII
6811
20416 79TH AVE W
NOTICE:
No warranty of accuracy.
The information shown on the attached
map(s) was compiled for use by the City of
Edmonds, its Employees and Consultants.
The City of'Edmonds does not warrant the
accuracy of anything set for ' th on these
map(s). Any person or entity -requesting a
copy should conduct an independent
inquiry regarding the information shown on
the -map(s), including, but not limited to,
the location of any sewer stub shown. Such
sewer stubs may or may not exist and may
or may not exist at the location shown.
Neither the City of Edmonds nor its
emp-l-oyee-s o-r officers sha-111 be [iabl-e for the
information given on this map(s), nor for
any one representation provided based
upon said map(s).
CITY OF EDMONDS
CIVIC CENTER — WATER -SEWER DEPARTMENT
SIDE SEWER PERMIT
ADDRESS -------- 2P41A --- 7_19-th --- A.ve_nue_..We.s.t ----------------
OWNER ------------- Loe-s-lie Gr
call rRospect 6-1107 when work
Is ready for Inspection. (No inspec-
tions Saturday, Sunday or holldsys.)
N2 2858
CONTRACTOR ........... �jqW.,-JRc .................. -------------
Permission is granted .................... M-a. ... r --- q ---- h. 26, Ig..68,
.. ..... ...... for ----------_------------ days to REPAIR or CONNECT a side sewer
with City Sewers in accordance with application on file and governing ordinances.
ATTENTION IS CALLED TO THE FOLLOWING:
NOTE No. I —The owners of the Property may obtain a permit to construct sewer inside Property line. A licensed Side Sewer Contractor must
be employed to construct side sewer In street area. Do not cover any portion of sewer before it has been Inspected.
NOTE No. 2—Obtain full information regarding Ordinance 11.16.030 and Regulations governing side sewers when you get permit.
NOTE No. 3--Top of side sewer must have at least 30 inches coverage at property line and 12 inches inside property line; min mum grade of 2%.
No bends in grade sharper than % will be permitted.
F- �, No. 4—Trenches in street must be water settled and surface of street restored to original condition. Contractors shall be responsible for
failure due to improper work which nmy develop within one year ��completion.
Nul'E No. 5--It is unlawful to alter or do any other work than Is provided for in the permit, or to do any work on the main sewer or Its appur-
tenances except to insert the pipe into the wye.
The City of Edmonds
APPLICATION
STREET FILE for
S11DE SEWER PERMIT
NEW CONSTRUCTION)gL, REPAIRS 0
EASEMENT No . .....
OWNER ............................................... CONTRACTOR ---------- 9� ?-. 4- .4?-el .................................................. PERMIT No.
ADDRESS .. . ....... ...................... LEGAL DESCRIPTION: LOT No . ......... ................................ BLOCK No . ............................................
NAMEOF ADDITION ..... ... . ........... k .............................................................
0
APP.
MAR 2 6 lj,;B
Approved:
DATE............... By ........ .. ................................. ................
V"
t e-�; lie-.
'a
ram oun
t=�gx
or Sitt
of
sitat,or dr� Sep=
co!�!'M'Z
I
ir
Zone V�;_o Comer �J Flag A/
Setbacks
Required Actual
Front
Sides
Rear
Other
Height
YED r
8v
7 �4/k Poe— �j
Lj
pql�
2-0 � I �P Iq t"' Alt
�ajo�,, CaApt-
[INC61-e
Ar
R. R C E d v ME DU
SEP 2 5 2012
DEVELOPMENT SERVICES CTR.
CITY OF EDMONDS
STREET FLE
IPL -70 x 13
2-60 LF /00
ME