Loading...
20430 82ND AVE W.PDF111111111111 7548 20430 82ND AVE W APR - 5 PERMIT - COUNTER CITY COPY. [4 M%p' H14, SZ I **p -11R J4, F 1!-. �4bloWWW- r& 4m!Wr,; mi 6- r7 30 4,6---c e mr- dver 30"A44-4 d-44 &w4,. ftu,)\ fwv.\ 7 APPROVED BY PLANNING �'q 2 M-1(gMLA MEMORANDUM Date: April 29, 1997 To: Jeannine L. Graf, Building Official CITY Copy From: Ann Bullis, Plans Examiner Subject: Alternate subfloor material for proposed deck at 20430 82nd Avenue West Enclosed is a letter from Glenn and Wendy Werner requesting approval (per UBC 104.2.8) of Durabord, a recycled plastic product, to be used for their deck subiloor. UBC 2326.9.1 sets forth the requirements for wood subfloonng. I have compared the physical properties of IHF#2 and Durabord plastic lumber and found that Durabord plastic lumber exceeds the strength of HemFir except for the Modulus of Elasticity: Durabord 1HF#2 • Bending Strength 3066 psi 850 psi • Hortz. Shear Strength 1220 psi 75 psi • Compressive Strength 3380 psi 1250 • Modulus of Elasticity 109,000 psi 1,300,000 psi • Nail withdrawl 240 lbs 42 lbs. UBC Table 23-I-Q allows 2" decking to span 48" (LL=40, E=512,000). To compensate for the low modulus of elasticity, the manufacturer recommends placing the plastic lumber decking on wood joists spaced 16" o;c. and 12" o.c. for I" wood decking. I contacted Gordy at Metro Plastics (makers of Durabord), and asked him for the engineering calcs or test results showing that the recommended joist spacing is adequate for the material. He said that there was no engineering done, and testing has only been done by trial and eff6r. W said the product has been installed at the recommended spacing for many years in Montana, Idaho, California, Washington and Oregon and no problems have been observed. He did say that in hot climates there have been problems with the I" decking placed 24" o.c., but Western Washington does not get hot enough to be a problem. Based on the above information, I recommend approval of the product for use as decking subfloor, following mfg. recommendations, placing the 2x decking on wood joists spaced 16" o.c. for the above noted project. It should be noted on the face of the permit that the deck area shall not be enclosed into habitable space unless the subiloor material meets the UBC requirements. Alternative Matchal Approved Denied Comments: ir:* 40;50�� Jeannine L. Graf, Official - 41, z &0 P Date City of Edmonds cQ Planning Division CITY OF EDMONDS" CONSTRUCTION PERMIT APPLICATION OWNER NAME/NAME OF BUSINESS b=,PAJ9R /AJP_ hfPC") 40 '4_14-C 4J ZIP TELEPHONE NUMBER R 2 -3 1 A KF_ -sr. .5. # le to CITY ZIP TELEPHONE NUMBER 91&;,K4,4tdb 990.S3 1-961,2927,11A NAME ADDRESS -?.-? 3 CITY ZIP TELEPHONE NUMBER IT! U USE PERMIT 970390 S Z ZONE o NUMBER 0 [JAD'DRESS 'SUITE/APT # XUAL UC01,H11`1IVr4 tHLUK SUBDIVISION NO. LID NO. PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP. TESCP Approved 0 EXISTING — REOUIRED DEDICATION RW Permit Required 11 Street Use Permit Req*d 0 Inspection Required ' 0 PROPOSED Sidewalk Required 0 METER SIZE LINE SIZE NO. OF FIXTURES PRV REQUIRED t YES 0 NO 0 1EMARKS — ENGINEERING MEMO OZ F-0.41a DS Z��J 2 0 U. 1-cu REVIEWED I STATE LICENSE NUMBER EXPIR T QLSJ,MPV1?'2 *A/M ,�T JTDJT SIGN AREA ALLOWED PROPOSED SEPA REVIEW COMPLETE Legal Description of Property - include all easements D-v 5 Z r 0 VIE FOP24 76 I`�5r,6F Lor 7. CAsr EXP ,jEXEMPT VARIANCE OR CU PLANNING REVIEW BY DATE /4 cr Lu Of qke6epEp 1, 1A) I/& /,Z OtC PMr:S SETBACKS — FEET HEIGHT. LOT COVERAGE 129 1 ' R FRONT 2 5 Slot EAR MM RFMARKS 75' 15 17. uj Property lha 97 Tax Account ParcelNo. #311 000 007 IV 09 NEW V_NRESIDENTIAL PLUMBINGIMECH W1 El COMPLIANCE OR El ADDITION f COMMERCIAL APT. BLDG. CHANGE OF USE REK40DEL SIGN GRADING FENCE E] REPAIR — CYDS. I x _FT) DEMOLISH WOODSTOVE 1-1 INSERT SWIM POOL El HOT TUB/SPA ' GARAGE RETAINING WALL/ F] F] CARPORT onelleg:RV RENFWAL TYPE OF USE. BUSINESS OR ACTIVITY) EXPLAIN NUMBER NUMBER OF CRITICAL OF . DWELLING AREAS -7-:401 STORIES I UNITS INUMBER DESCRIBE WORK TO BE DONE (ATTACH PLOT PLAN) 4 leg T W in 64V BY, I TYPE OF CONSTRUCT - 0'0A, 5 1 OCCUPANT REQUIRED WCK- 50 -7 LOAD 0 YES REMARKS PROGRESS INSPECTIONS PER UBC 108 FINAL INSPECTION REOUIRED ftt5r6 PLAN CHECK FEE HEAT SOURCE: GLAZING PLUMBING Plan Check No. (I I :�% / 0 :7- MECHANICAL This Permit covers work to be done on private property ONLY. GRADING/IFILL Any construction on the public domain (curbs, sidewalks, STATE SURCHARGE marquees, etc.) will require separate permission. ,driveways, Pe Permit Application: 180 Days P Pe ermit Limit: I Year - Provided Work Is Started Within 180 Days STORM DRAINAGE FEE "Applicant, on behalf of his or her spouse, heirs, assigns and ENG. INSPECTION FEE successors in. interest, agrees to indemnify, defend and hold harmless the City of Edmonds, Washington, its officials, m employees, and agents from any and all claims for damages of cc 4 whatever nature, arising directly or indirectly from the Issuance of this permit. Issuance of this permit shall not be deemed to PLAN CHECK DEPOSIT modify, waive or reduce any requirement of any city ordinance TOTAL . AMOUNT DUE OX Inor limit in any way the City's ability to enforce any ordinance provision." I hereby acknowledge that I have read this application; that the information given is correct; and that I am the owner, or the duly ATTENTION authorized agent of the owner. I agree to comply with city and THIS PERMIT state laws regulating construction; and In doing the work authoriz- AUTHORIZES ed thereby, no person will be employed In violation of the Labor ONLY THE Code of, the State of Washington relating to Workmen's Compensa- WORK NOTED tion Insurance and RCW 18.27. INSPECTION SIGNATURE (OWNER OR AGENT) DATE SIGNED DEPARTMENT, AIJ,WAI — ` CITY OF EDMONDS ATTENTION CALL FOR INSPECTION IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR . * 771 -0220 A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. USC SECTION 109 W191 APPLik-�,IATION-n..P--.OV4C""- This application is not a permit until signed by the Building Official or his/her Deputy; and fees are paid, and receipt is acknowledged In space provided. Cl SIG 06 ;VSE0'#Y: DATE IIGINAL—.File YELLOW— Inspector PINK — Owner GOLD — Assessor 06�IJAf 0 C T OF EDMONDS 250 5TH AVENUE NORTH, EDMONDS, WA 98020 (206) 771-0220 RCW 197-11-970 Determination of Nonsignificance (DNS) DETERME"4ATION OF NONSIGNIFICANCE Description of proposal: Construct a deck and storage room on a site with.a designated slo . onment on the City's Environmentaly Sensitive Areas Map (City of Edmonds Building Plan Check No' 97-107). Proponent: Mr. and Mrs. Glenn 0. Warner Location of proposal, including street address if any: 20430 - 82nd Avenue W., Edmonds, Washington Lead agency: CITY OF EDMONDS The lead agency for this proposal h ' as determined that it does.not have a probable significant adverse impact on the environment. An environmental impact statement is not required under RCW 43.21.030(2)(c). This decision was made after review of a completed environmental checklist and other information on file With the lead agency. This information is available to the public on request. x There is no comment period for this DNS. This DNS is issued under 197-11-340(2); the lead agency will not act on this proposal for 15 days from the date below. Comments must be submitted by Responsible Official: Jeffrey S. Wilson Position/Title: Current Planning Supervisor, Department of Community Services - Planning Division Phone: (206) 771-0220 Address: City of Edmonds, 250 5th Avenue North, Edmonds, WA 98020 Date: (I Signatu xx You may appeal this determination to Robert Chave, Planning Manager, at 250 5th Avenue North, Edmonds, WA 98020, no later than I�Rnj 30 1997, by filing a written appeal citing the reasons. You should be prepared to make specific factual objections. Contact Jeffrey S. Wilson to read or ask about the procedures for SEPA appeals. xx Posted on r-, I 16:7 1997, at the Edmonds Public Library, Edmonds Community Services Buildin , and the Edmonds Post Office. xx Distribute to "Checked" Agencies on the reverse side of this form, along with a copy of the Checklist. C17T Cop%, Page I of 2 NEW DNS.DOC 4/14/97.SEPA Mailed to the following along with the Environmental Checklist: XX Environmental Review Section Department of Ecology P.O. Box 47703 Olympia, WA 98504-7703 XX Applicant: Mr. and Mrs. Glenn 0. Werner 20430 - 82nd Ave. W. Edmonds, WA 98020 pe: File No. PC-97-107 SEPA Notebook Page 2 of 2 NEW DNS.DOC 4/14/SF7.SEPA of ELD 0 rp 16� St. I Date: To: MEMORANDUM April 14,1997 i File No. PC-97-107 (Building Permit) From: M.E. Meg Gruwell Via: Jeffrey S. Wilson, Responsible Official Subject: ENVIRONMENTAL DETERMINATION FOR WARNER DECK AND STORAGE ROOM; FILE NO. PC-97-107 I have had the opportunity to visit the site, and review the environmental checklist and building permit application materials which have been prepared for the project. A copy of these are riled in the official file for this permit. Based on my review of all available information and adopted policies of the City, I recommend that an environmental determination of nonsignificance be issued for the project. Review by Responsible Official lconcur: I do not concur: Comments: ho Jeffr*eyWilson Date Attachments pc: File No. PC-97-107 City of Edmonds cze Planning Division PC97107CDOC 04/14/97. O'F CITY OF EDMONDS ENVIRONMENTAL CHECKLIST St. Purpose of Checklist. - The State Environmental Policy Act (SEPA), chapter 43.21C RCW, requires all governmental agencies to consider the environmental impacts of a proposal before making decisions. An environmental impact statement (EIS) must be prepared for all proposals with probable significant adverse impacts on the quality of the environment. The purpose of this checklist is to provide information to help you and the agency identify impacts from your proposal (and to reduce or avoid impacts from the proposal, if it can be done) and to help the agency decide whether an EIS is required. Instructionsfor Applicants. This environmental checklist asks you to describe some basic information about your proposal. Governmental agencies use this .checklist to determine whether the environmental impacts of your proposal are significant, requiring preparation of an EIS. Answer the questions briefly, with the most precise information known, or give the best description you can. You must answer each question accurately and carefully, to the best of your knowledge. In most cases, you should be able to answer the questions from your own observations or project plans without the need to hire experts. If you really do not know the answer, or if a question does not apply to your proposal, write "do not know" or does not apply". complete answers to the questions now may avoid unnecessary delays later. Some questions ask about governmental regulations, such as zoning, shoreline, and landmark designations. Answer these questions if you can. If you have problems, the governmental agencies can assist you. The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of time or on different parcels of land. Attach any additional information that will help describe your proposal or its environmental effects. The agency to which you submit this checklist may ask you to explain your answers or provide additional information reasonably related to determining if there may be significant adverse impact. Use of checklistfor nonprojectproposals: Complete this checklist for nonproject proposals, even though questions may be answered "does not apply." . IN ADDITION, complete the SUPPLENENTAL SBEET FOR NONPROJECT ACTIONS (part D). For nonproject actions, the references in the checklist to the words "project," "applicant," and "property or site" should be read as 'Oproposer," and "affected geographic area," respectively. A. BACKGROUND 1. Name of proposed project, if applicable: rootvL 2. Name of applicant: Gle-mv) 0. OeKpiex 3. Address and phone number of pplicant and contact person: 0 V .5 0 AIA C/ 9 0,,� 7 -7 4 4 CHUT i DOOI-NOV-93 Page I of24 MASTEMSPEA -51 /-n 4. Date checklist prepared: - 21, � tl,' 5. Agency requesting checklist: City of Edmonds. 6. Proposed timing or schedule (including phasing, if applicable): _AzL/*1-z72z- (STAFF COMMENTS) 7. Do you have any plans for future additions, expansion, or further activity related to or connected with this proposal? If yes, explain. (STAFF COMMENTS) 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. h 0 P? k, (STAFF COMMENTS) 9. Do you know whether a . pplications arc pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. OL V (STAFF COMMENTS) Page 2 of 24 CHKLT.DOC\I-NOV-93 MAMERWEA 10. List any government approvals or permits that will be needed for your proposal, if known. (STAFF COMMENTS) 5-"�l 11. Give brief, complete description of your proposal, including the proposed uses and size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. 4 92EIV -5- A?!2 �9V � EZ- 122E C/,- L)IL7- MJ IdE RAE��2 VAR-b '04 &IF-0-3. So F-Ir -SrO19A&E, A246-M. ReJ147—,4Jg&7- 7,-n 774F— (STAFF COMMENTS) 12. Location of the proposal. Give sufficient information for a person to understand the precise location of your proposed project, including a street address, if any, and section, township, and range, if known. If a proposal would occur over a range of area, provide range or boundaries of the site(s). Provide legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans -required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. 7WE roR7-14 176 are,67- er- i-or )74 EA.57-F_DA46�JD�; 4eRas- THA!5� OF PLAT'�' (STAFF COMMENTS) CHUT.D001-NOV-93 Page 3 of 24 MASTEMSPEA TO BE COMPLETED BY APPLICANT B. ENVIRONMENTAL ELEMENTS 1. Earth a. General description of the site (circle one): FlaQj�;� hiUy, steep slopes, mountainous, other: ' (STAFF COMMENTS) b. What is the steepest slope on the site (approximate percent slope)? -2s— '27 (STAFF COMMENTS) C. What general types of soils are found on the site (for example, cla_<, �sa�nrav , peat, muck)? If you know the classification of agricultural soils, specify them and note any prime farmland. (STAFF COMMENTS) U d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe. (STAFF COMMENTS) Page 4 of 24 CHKLT * DOMI-NOV-93 MASTEMSPFA e. Describe the purpose, type 'and approximate quantities of any filling or grading proposed. Indicate source of rill. (STAFF COMMENTS) Could erosion occur as a result of clearing, construction, or use? If so, generally describe. (STAFF COMMENTS) g. About what percent of the site will be covered with impervious surfaces after project construction (for example, asphalt or buildings)? 75 It, (STAFF COMMENTS) h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: (STAFF COMMENTS) 2. AIR a. What types of emissions to the air would result from the proposal (i.e., dust, automobile, odors, industrial wood smoke) during construction and when the project is completed? If any, generally describe and give approximate quantities if known. (STAFF COMMENTS) CHKLT.DOC\I-NOV-93 Page 5 of 24 MASTERWEA b. Are there any off -site source's of emissions or odor that may effect your proposal? If so, generally describe. (STAFF COMMENTS) C. Proposed measures to reduce or control emissions or other impacts to the, if any: ­700 Q J + C­ (STAFF COMMENTS) 3. WATER a. Surface: (1) Is there any surface water body on or in the immediate vicinity of the site (including year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. if appropriate, state what stream or river it flows into. �\ 0 (STAFF COMMENTS) (2) Will the project require any work over, in, or adjacent to (within 200 feet) the described waters? If yes, please describe and attach available plans. (STAFF COMMENTS) (3) Estimate the amount of rill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of rill material. hoyLL (STAFF COMMENTS) Page 6 of 24 CHKLT.DOMI-NOV-93 MASMR\SPEA (4) Will the proposal re q*uire surface water withdrawals or diversions? Give general description, purpose, and approximate quantities if known. (STAFF COMMENTS) (5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan. no (STAFF COMMENTS) (6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. YA 0 (STAFF COMMENTS) b. Ground: (1) Will ground water be withdrawn, or will water be discharged to ground water? Give general description, purpose, and approximate quantities if known. Y�C) (STAFF COMMENTS) CHKLT.DCOI-NOV-93 Page 7 of 24 MASMR\SPEA (2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any (for example: Domestic sewage; industrial, containing the following chemicals...; agricultural; etc.). Describe the general size of the system, the number of such systems, the number of houses to be served (if applicable), or the number of animals or humans the syste.m(s) are expected to serve. (STAFF COMMENTS) C. Water Runoff (including storm water): (1) Describe the source of runoff (including storm water) and method of collection and disposal, if any (include quantities, if known). Where will this water. flow? Will this water flow into other waters? If so, describe. (STAFF COMMENTS) (2) Could waste materials enter ground or surface waters? If so, generally describe. K0 (STAFF COMMENTS) d. Proposed measures to reduce or control surface, ground, and runoff water impacts, if any: '11) -9- 5 V'VO t CA D-0 LA (STAFF COMMENTS) Page 8 of 24 CHKLT ' D001-NOV-93 MAMMSPEA 4. Plants a. Check or circle types of vegetation found on the site: deciduous tree: alder, maple, aspen, other: evergreen tre"(���ine, other: tI/ shrubs Y VCAq—LY\&YTnS O-Z-0-�koj j 5 I------ 7 . - L-' grass — pasture — crop or grain wet soil plants: cattail, buttercup, bulrush, skunk cabbage, other: water plants: water lily, eelgrass, milfbil, other: other types of vegetation: (STAFF COMMENTS) 4� p th-4-1, t- s ink i ,,- 41z4�s ,;,i( 4-e t-k & I',,- b. What kind and amount of vegetation will be removed or altered? n 0 AL (STAFF COMMENTS) C. List threatened or endangered species known to be on or near the site. Y� o VAk- (STAFF COMMENTS) Page 9 of 24 CHKLT i DOMI-NOV-93 MASTERWEA d. Proposed landscaping, use of native plants, or other materials to preserve or enhance vegetation on the site, if any: (STAFF COMMENTS) 5. Animals a. Check or circle any birds and animals which have been observed on or near the site or are known to be on or near the site: birds: hawk, heron, eagle, songbirds, other: Ct-14ujs 6PARacw�& mammals: deer, bear, elk, beaver, other: fish: bass, salmon, trout, herring, shellfish, other: (STAFF COMMENTS) b. List any threatened or endangered species known to be on or ear the site. Royu- +koct T� ��Vl 0 Vj - 0 (STAFF COMMENTS) C. Is the site part of a migration route? If so, explain. ho (STAFF COMMENTS) Page 10 of 24 CRKLT ' DOOI-NOV-93 MAMMSPEA d. Proposed measures to preserve or enhance wildlife, if any: /7 C00PI-15 01C RM-99 (STAFF COMMENTS) 6. Energy and Natural Resources a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. ��Q yu— (STAFF COMMENTS) b. Would your project affect the potential use of solar energy by adjacent properties? If so, 'generally describe. NO (STAFF COMMENTS) C. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: (STAFF COMMENTS) CHUT.D001-NOV-93 Page I I of 24 MASTERNSPEA 7. Environmental Health a. Are there any environmental health hazards, including exposure to -toxic chemicals, risk of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so describe. V� () (STAFF COMMENTS) (1) Describe special emergency services that might be required. Y\ a Yv— (STAFF COMMENTS) (2) Proposed measures to reduce or control environmental health hazards, if any: how (STAFF COMMENTS) b. Noise (1) What types of noise ' exist in the area which may affect your project (for example: traff le, equipment, operation, other)? (STAFF COMMENTS) CHUT.DMI-NOV-93 Page 12 of24 MASMR\SPEA (2) What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis (for example: traffic, construction, operation, other)? Indicate what hours noise would come from the site. k)A11-1AJ6 AAJt> 2)Q1L1-4k)6 /tJ S��Rp_�,5 q-5 (STAFF COMMENTS) (3) Proposed measures to reduce or control noise impacts, if any: (STAFF COMMENTS) 8. Land and Shoreline Use a. What is the current use of the site and adjacent properties? (STAFF COMMENTS) b. Has the site been used for agriculture? If so, describe. (STAFF COMMENTS) Page 13 of 24 CRUTDOMI-NOV-93 MASTEMSPEA C. Describe any structures on the site. 3 IFF-op-COAAL-U6059 (STAFF COMMENTS) d. Will any structures be demolished? If so, what? �-\n (STAFF COMMENTS) e. What is the current zoning classification of the site? R G (STAFF COMMENTS) f. What is the current comprehensive plan designation of the site? V-� 0 (STAFF COMMENTS) 9. If applicable, what is the current shoreline master plan designation of the site? Id 12 S: V� 0 N \1 (STAFF COMMENTS) CHUTDC01-NOV-93 Page 14 of 24 MASTEMSPEA h. Has any part of the site been classified as an "environmentally sensitive" area? If so, specify. j. k. 1. svv\,Q�� 00r1k &'y br) --(;Y- ozs--� —S-kak). .4 J YC;--P=-2 (STAFF COMMENTS) .�elt 6,q 1 On L 6t.) . a�i Approximately bow many people would reside or work in the completed project? -7Dd Q S �A gkk"\ �Q (STAFF COMMENTS) N. Approximately how many people would the completed project displace? A rs (STAFF COMMENTS) Proposed measures to avoid or reduce displacement impacts, if any: bo �Q c. qt V (STAFF COMMENTS) Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: NO (STAFF COMMENTS) CHUT.D001-NOV-93 Page 15 of 24 MASTERWEA 9. Housing a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low-income housing� (STAFF COMMENTS) b. Approximately how many units, if any would be eliminated? Indicate whether high, middle, or low- income housing. 0GQ_3 Y\ 0+ e-1 '0 D4, (STAFF COMMENTS) C. Proposed measures to reduce or control housing impacts, if any: (STAFT COMMENTS) 10. Aesthetics a. What is the tallest height of any proposed structure(s), not including antennas; what is the principle exterior building material(s) proposed? sl-ORA69 Repam 13 ' wall SL29&F 96?201. 'r 4EMR, a2 M,47-e-ll AXIST (STAFF COMMENTS) CHUTDC01-NOV-93 Page 16 of 24 MASTER\SPFA b. - What views in the immediate vicinity would be altered or obstructed? how (STAFF COMMENTS) C. Proposed measures to reduce or control aesthetic impacts, if any: (STAFF COMMENTS) 11. Light and Glare a. What type 'of light or glare will the proposal produce? What time of day would it mainly occur? (STAFF COMMENTS) b. Could light or glare from the finished project be a safety hazard or interfere with views? Y� 0 (STAFF COMMENTS) C. What existing off -site sources of light or glare may affect your proposal? (STAFF COMMENTS) CHUT.D001-NOV-93 Page 17 of 24 MASTEMSPEA d. Proposed measures to reduce or control light and glare impacts, if any: hQ+ (STAFF COMMENTS) 12. Recreation a. What designated and informal recreational opportunities are in the immediate vicinity? (STAFF COMMENTS) A--A4u,^,k b. Would the proposed project displace any existing recreation uses? If so, describe. (STAFF COMMENTS) C. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any: U (STAFF COMMENTS) Page 18 of 24 CHUT.DOLU-NOV-93 MASMRXSPEA 13. Historic and Cultural Preservation a. Are there any places or objects listed on, or proposed for, national, state, or local preservation registers known to be on or next to the site? If so, generally describe. 3% (STAFF COMMENTS) b. Generally describe any landmarks or evidence of historic, archaeological, scientific, or cultural importance known to be on or next to the site. T) 0 "— (STAFF COMMENTS) C. Proposed measures to reduce or control impacts, if any: (STAFF COMMENTS) 14. Transportation a. Identify public streets and highways serving the site, and describe proposed access to the existing street system. Show on site plans, if any. (STAFF COMMENTS) Page 19 of 24 CHKLT * D001-NOV-93 MASTEMSPEA b. Is site currently served by public transit? If no, what is the approximate distance to the nearest transit stop? VIC* (STAFF COMMENTS) C. How many parking spaces would the completed project have? How many would the project eliminate? (STAFF COMMENTS) d. Will the proposal require any new roads or streets, or improvements to existing roads or streets, not including driveways? If so, generally describe (indicate whether public or private). Y) (STAFF COMMENTS) e. Will the project use (or occur in the immediate vicinity of) water, rail, or air transportation? If so, generally describe. �J (STAFF COMMENTS) Page 20 of 24 CHKLT.DCC\I.NOV.93 MAMMSPEA c:I f. How many vehicular trips per day would be generated by the completed project? If known, indicate when peak volumes would occur. (STAFF COMMENTS) g. Proposed measures to reduce or control transportation impacts, if any: DO �P- r� - Y\ ri CJ-'IR P:A& --- (STAFF COMMENTS) 15. Public Services a. Would the project result in an increased need for public services (for example: fire protection, police protection, health care, schools, other)? If so, generally describe. n (STAFF COMMENTS) b. Proposed measures to reduce or control direct impacts on public services, if any: (STAFF COMMENTS) CUKLT.DCOI-NOV-93 Page 21 of 24 RASTEMSPEA 16. Utilities a. ilities currently available at the sit sanitary sewer eptic system, other: C;;;� (STAFF COMMENTS) b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. — hD fW1 (STAFF COMMENTS) C. SIGNATURE The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relying on them to make its decision. Signature of Proponent Date Submitted Page 22 of 24 CHUT.D001-NOV-93 RAMR%PFA ROW DA Zone D S.E. 1/4, SEC. 19 T.27N., RA E.W.M. 206 A 1 :us 209 — 1 202091 1 114 1 1 1 —41 �1 , I.. — - aw. I 202015 20206 2.a2M 20210 2021,3 202 X0 211261 wm mW OL ZOXIC. 20224 225 0227 022 . 04 20231 to ol "j-4 2030. m F2 23 �'�4Z 20 -N 20312 gel X 20323 314 r cc CIA aD 00 o" 2% -21M P B 1203ZO , rw C', #409 6w %A *4 'a" 0407/ 20411 07 "%�08 07 om cc '30416 0. 14 04 TH it 16 16 101401 90 11 2OM42A ELE. 29430 10427 29 1 0417 0430 99 ir 2M 30 oqz7 04 cc Um 3 ZOSO4 03 to ?c oci D3 20563 206 PL, 205-1Z sit 20612 0513 OC12 20509 Z A 15 gos . ?� r. 20513 IN 'a 2.SZJ 20� IDGE Pr', 152ui a 5 25 624 F 01'28 206-M 51W. 2067" ST. b. W. PA R K v CD "Or E2O602. 20606 7 Oro" 12 "a Z%m lrt4, W6W 420 15* Z062Z 2"25 'r — 2.0"s to %. 204.22 20620 20630 10431 �20630 PL 201,3o Js 2009 mAomprow cr A"s 29 20704 20,132 SwAmP 03 1 — , 20703 f!;� �,11;0 0 10 20703 20702 207a 40 707 %Wo�bw"G 1W BOG, 61 207409 W710 1 20710 ' 20709 %oz 40 POHD tz U; 2ID717 Z07/4 C� > It P 717 20710 2,070 v 0719 72, 20T, 2 c" — MARSH 4 WA lb Va 0715 1 27 42072 20727 QU 207U r4 a. 20no 7 ts ;R .4— orrnw&. 4c 08 zome 0. Z0845 29720 I -- N I A. 200iv 29811 rh Sw 20019 200)9 —K TV e, 6 w 20116 00 20917 zools'! 994 20921 — — 825, 0/0 C:-1 a ro 20030 RE 2� 11 if is �k 2 30 20029 — 901 20900 RD a fA, 0903 zo 209-4 9 5 It zs.9jf11bA2z 9of 4 0904209 to 20912 CNALEr 70119 9&3 17 A YAX 2093Z i'" WOW 20 '5.' > 2091 974 5T. 090 W 20909 IMPEOU.41. 25D to 101. 0902 1 W91 2"26 Z0991 Z&916 1003 \0 —1 U 210 a" P., 241 20925 ZJ014 "'o"Do" or -- a RE 'g To" 005 21 '. — 21cZ6 2tjoq 'CA 11A IQL. I., oto� ficog 214 2100/ 21106 0 21009 ole J003 2101 opmal 1 32, "d. 21021 11.1. it rL /006 21016 2104 zillo I loop cm 6 13 40 a 210272,114 21025 s vs ; 2J026 0 21 ZI 21 VOOD . "11C Imb 02 21 2/103 211144 AW 21031 103 21104 LPPiE gloo I's 14, 2102S — 2JIMP 2 St"Af MY1,960 jj24 los 21118 21117 x z -- Zolfo 11"I"Wow — 4J7 6. sillit 1 �- 'a C GO a s;; /0 1 2f/24 2#26 = a- a, in C 2112mv .. I r. ?.1fl4 — (Y 211, P 01 a A"s 2(130 1 8 t, 21120 Olt �g yj 2 ST. '214 4 all 0 *4 M 0 -4 21207 ted TO IeW IL — zo , A 1, i A 0 - -5-s C? u I RE r, It 212/4 a 2(215' 11. aw .9 21221 Oil — Z1222 01.1 on 3,03 W ico V223 & woo I ro,vx�erolk) 6-,X-r -,��rg4c�< CA FIL� NO. Critical Areas Checklist ---------------------------------- 7 — — — — — — — — — — — — — — — — — — — — — — — — — — - Site Information (soils/ topography/ hydrology/ vegetation) i 1. Site Add riess/ Location: c:2 & q 3c--'-, 3 9, A::2 .,4 eliE7 1f__ 2. Property Tax Account Number: /-0 If — 0 0 6) — 6� 6 3. Approximate Site Size (a cres or square feet): 4. Is this site currently developed? ZYes; no. If yes; how is site developed? 5. Describe the general site topography. Check all that apply. Flat: less than 5-feet elevation change over entire site. Rolling: slopes on site generally less than 15% (a vertical rise of 10-feet over a horizontal distance of 66-feet). Hilly: slopes present on site of more than 15% and less than 30% ( a vertical rise of 10-feet over a horizontal distance of 33 to 66-feet). Steep: grades of greater than 30% present on site (a vertical rise of 10-feet over a horizontal distance of less than 33-feet). Other (please describe): 6. Site contains areas of year-round standing water: Approx. Depth: 7. Site contains areas of seasonal standing water: - A Approx. Depth: What season(s) of the year? 8. Site is in the floodway— floodplain— of a water course. 10 9. Site contains a creek or an area where water flows across the grounds surface? Flows are year-round? Flows are seasonal? — (What time of year? 10. Site is primarily: forested meadow ;shrubs mixed urban landscaped (lawn,shrubs etc) 11. Obvious wetland is present on site: Alb For Citv Staff. Use OnI Y.. ::Site is Zoned?.:.... 2. SCS mapped. so' iliy i-P . -.f pe s ? L ::.W�tl�nd inveritoiy`.�.or..0 A: j di* etland:,oresent on site? m4p..,:in...catps..w ? iiticai.Areg.ts inv'.entor.y:.oT,.CA,. map: indicates Critical. Atea*.on site. 5 1,,v, j-, f �.:...:,:54e. within de]si r ­ subsidenkeJ gnAted..6 th landslide hazard area? 'No ;6 Sit d t d. th Eny n. Sensi ns'M e:. esign4. e e: ironmi� tally five A re a R.- ie� :DETERMINATION::' ^ca_chk.doc. Rev 02/11/97 City of Edmonds Critical Areas '4C. I S9, The Critical Areas Checklist *contained on this form is to be filled out by any person preparing a Development Permit Application for the City of Edmonds prior to his/ her submittal of a development permit to the City. The purpose of the Checklist is to enable City staff to determine whether any potential Critical Areas are or may be present on the subject property. The information needed to complete the Checklist should be easily available from observations of the site or data available at City Hall (Critical Areas inventories, maps, or soil surveys). An applicant, or his/her representative, must fill out the checklist, sign and date RECE:iVED MAR 13 1997 COMMUNITY SEVI'110ES Checklist it, and submit it to the City. The City will review the checklist, make a precursory site visit, and make a determination of the subsequent steps necessary to complete a development permit application. With a signed copy of this form, the applicant should also submit a vicinity map or plot plan for individual lots of the parcel with enough detail that City staff can find and identify the subject parcel(s). In addition, the applicant shall include other pertinent information (e.g. site plan, topography map, etc.) or studies in conjunction with this Checklist to assist staff in completing their preliminary assessment of the site. I have completed the attached Critical Area Checklist and attest that the answers provided are factual, to the best of my knowledge (fill out the appropriate column below). Owner/ Applicant: 61e-1111-) 0- V)e-r�le�- Name o 6"') Street Address City, State, ZIP Phone "gignature Date Applicant Representative: Name Street Address City, State, ZIP Phone Signature - Date City of Edmonds Critical Areas Determination I Applicant: Glenn 0. Werner Determination #: CA-97-40 Project Name: Non -Project Specific Permit Number: Site Location: 20430 - 82nd Avenue W. Property Ta x Acct #: 4311000 007 0108 Project Description: Non -Project Specific Determination: Conditional Waiver: During review and inspection of the subject site, it was found that the site contains an Erosion Hazard Area and a Wildlife Habitat Area pursuant to Chapter 20.15B of the Edmonds Community Development Code (ECDC). Waiver Criteria (all criteria must be found to apply): X There will be no alteration of the Critical Area or its required buffers pursuant to the requirements of Chapter 20.15B; X The development proposal will not impact the Critical Area in a manner contrary to the goals, purposes, objectives and requirements of the Critical Areas ordinance; X The development proposal meets the minimum standards of the Critical Areas ordinance; X The above findings are based on the following conditions of approval: 1. Alterations within identified Erosion Hazard Areas shall not be authorized without an approved erosion control plan pursuant to ECDC Chapter 18.30, which includes staged clearing, where appropriate. The erosion control plan must be approved by the City of Edmonds Engineering Department. 2. Clearing or disruption of the soils within an Erosion Hazard Area shall be kept at the minimum necessary to provide reasonable use of the site. 3. Any project shall be constructed in compliance with the City of Edmonds approved plans and code requirements. 4. A Tree Clearing Permit shall be required for trees proposed to be cut on any portion of the lot that has slopes exceeding 25 percent. Based on the above findings and conditions, the requirement for a Critical Areas Study associated with this development permit is hereby Waived, as authorized by Chapter 20.15B. 150 (B) of the Edmonds Community Development Code. Meg GraweU 3/21/97 Name SignaffiS6 Date 0 CITY OF EDMONDS 9 PUBLIC WORKS DEPARTMENT.1 ENGINEERING DIVISION =Wm� THIS PERMIT MUST BE AVAILABLE AT THE JOB SITE FOR INSPECTION PURPOSES Applicant to Complete Parts A and B A. Permit to be issued to: <!f 6 For Work at :(address or vicinity) /Z 10 & 7- ;f- 11,11e a A/Z> 7 �,,fOe 7;�I'- Is Type of Work to be done: e1&X101,A11_ (attach drawing when applicable) I 64&1,e_ Time Required -- Start: 1$_Xg 7�5 D, Owner: _�� /7/1 Name 2- & f,/-.3 o 06 h6f Mail�ng Address )� a Ili/ � City State Zip Contractor: —1�a llylellet"�"0-11— Name .15�A /_td- f I - Mailing Address Finish: 61ffd 17,5 T�lephone Number ,�_, ;-, '? - 2 / �� - Wd - -Z - ?- S -1 —' /7-/ State License Number City State Zip Telephone Number B. INDEMNITY: Applicant understands and by his signature to this application, agrees to hold the City of Edmonds harmless from any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the applicant or the City of Edmonds, or any of its departments or employees, including or not limited to the defense of any legal proceedings including defense costs, court costs, and attorney -fees by reason of granting this permit. Upon issuance of this permit, the contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the restoration by the Engineering Division. Funds held from the Security Deposit (estimated restoration fee) will be held until the final street patch is completed, at which time a debit or credit will be processed for issuance to the applicant. Work is subject to inspection and restoration in accordance with City Code. A 24-hour notice is required for inspection by Engineering. Call 775-2525, ext. 220. I understand that this permit must be available at the job site.for inspection purposes at all times. / Signature Date: '.5-1-141117S �: �wne�ror Agent C. TO BE COMPLETED BY ISSUING AGENCY7 Date Issued: —Permit No. Fee:Z_1� - CDC= Security Bond: Time Authorized:-70 4:2 /APPROVED B Y�4 zl�_ Date: AV� v so -- ell Ir LF SEWER P E RMIT Of CITY OF EDMONSTREET F1 11,9 9 0 19 PERMIT NO 8266 Address of Construction: 2 0 3 0 raft-., e' MIA T 01VDS Prop rty Legal Description (Include all easement�): pt Owner and/or C ontractor: Ke vin Vz e_tske, State License No. INF11 VE �9 &C Building Permit No. qa0z 3(o /16 Single Family Multi -Family (No. of Units—) El Commercial El Public Invasion into City Right-of-Way:J%, No Yes RW-Construction Permit No. Cross other Private, Property: No. Yes Attach. legal description and copy of recorded eas�ement I I certify that I have-readland shall comply with all city requirements as indicated on the back of. the Permit Card. - / Date CALL DIAL -A -DIG (1-800-424-,5555) BEFORE ANY. EXCAVATION OFF C U E. NLY s; o FOR INSPECTION CALL 771-3202, PUBLIC WORKS DEPT. Permit Fee: Issued By Trunk Charge: Date Issued: Assessment Fee: Receipt No..- /3 2015" Lid No.: — Partial Inspection: Date I nitial Comments Reason Rejected: F Date.1nitial Final Inspection Approved: Date Initia,l :­:".k , PERM.IT M UST BE POSTED- ON JOB'SITE White Copy: File GreenrCopy: inspector Buff Copy: ppliprit Revised 3!90 NOTICE: N�o­warranty­of accuracy. The information'shown on the attached map(s) was compiled for use by the City of Edmonds, its Employees and Consultants. The City of �Edm.onds does not - warrant the accuracy of anything set forth on these rnap(�_). Any person or entity -requesting a copy should conduct an Independent inquiry regarding the information shown on -rn a p (s) , including, but not limited to, th-e loc'ation of any sewer stub shown. Such sewer stubs may or may'not exist and may or may not exist at the location shown. Neither the City of Edmonds nor its e rn p-'I- o-y e e-s o r o ff i C e,r s -'s h a. 1. 1 b e 1.-'-1 a. b.-II.-e f o r -IL h e information given* on -this map(s), norfor ation provided based any one represent upon . said map(s). The City of Edmonds Side Sewer Drawing EASEMENT NO - -------------- ------------------------ NEW CONSTRUCTION F-1 REPAIRS 0""" LID NO . .................. ASMT. NO - ----------------- OWNER----------------------------------------------------------------------- ------------------------ CONTRACTOR ------------------------------------------------------------------------------------ PERMIT NO. JOB ADDRESS ............... ..... .. ....... 4 ................ LEGAL DESCRIPTION: LOT NO - -------------------------------------- BLOCK NO - ------------------------------------ S'X 0,7 Nor-- 37 i— t NAMEOF ADDITION -------------- ---------------------------------------------------------------------------------------------- ,41111111,.� .4 3 � 1 4 t PWW-0001-11/75(REV.11/78) -... Nbp�a -SL-� 14 ' 9 tep. 0 L ZA O't Approved: .......... DATE ...... ... ...... B, EDMONDS TREA f r,�IENT�PL ANT --- _A .4, ".1"k 61,9 0 - 199 - City of Edmonds. RIGHT-OF-WAY CONSTRUCTION EET FILE PERMIT Permit Number: Issue Date: A. Address or Vicinity of Construction: 20430 82 Avenue West B. Type of Work (be specific): New Service C. Contractor: Washington NAtural Gas Company Contact: Frank Swan Mailing Address: 81.5 Mercer 'Street, Phone: 224-2278 State License #: Seattle, WA .98111 Liability Insurance: Bond:$ D. Building Permit # (if applicable): Side -Sewer Permit # (if applicable): E. T1 Commercial ., El Subdivision F -ity Project kR Utility (PUD, GTE, WNG,'CABLE, WATER) F] Multi -Family E] Single Family Other INSPECTOR: INSPECTOR: F. Pavement or Concrete Cut El Yes IgNo G. Size of Cut: x H.'Charge $ APPLICANT TO READ AND dN es, or INDEMNITY. Applicant understands and by his signature to this application, ag �e�s�� to hold the City of Edmonds harmless from injuries, damag claims of any jUnd or description whatsoever, foreseen or unforeen, that may be m:�e_ao&nst the, City of Edmonds, or any ofits dqpartments-oy employ- ;e c ees, including or not limited to the defense of any legal proceedings including de e costs., and atibmey fees by reason of granting this pe�nit? THE CON7RACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MA7ERIALS FOR A, PERIOD OF ONE YEAR FOLLOW[W THE FINAL INSPEC77ON AND ACCEPTANCE OF THE WORK ES77MA TED RESTORA 77ON FEES WILL BE HELD UN77L THE FINAL S7REET PA TCH71S 'CO14iLETED BY CITY FORCES, AT WHICH 77ME A DEBIT OR CREDIT WILL BE PROCESSED FOR ISSUANCE TO THE APPLICANT. Construction drawing of proposed work required with permit application. A 24 hour notice is required for inspection; Please call the Engineering Department-� 771-3202. Work is to be inspected during progress and. at completion. Restoration is to be in accordance with City Codes. Street shall be kept clean at all times. Traffic Control and Public Safety shall be in accordance with. City regulations as required by the City Engineer. All street cut ditches shall be patched with asphalt or City approved material prior to the end of the working day; NO EXCEPTIONS. I have read the above statements and understand the permit requirements and the pink copy of the permit will be available on site at all times for inspection purposes. me 40t"(00t Signature: Date: May 27, 1992 (Contractor or Agent) CALL DIAL -A -DIG PRIOR. TO BEGINNING WORK I NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE Engrg. Div. 1991 FIELD INSPECTION NOTES (Fund I I I - Route copy to Street Dept.) Comments: Diagram: CONTRACTOR CALLED FOR INSPECTION Partial Work Inspection by P. W.: Work Disapproved By: FINAL APPROVAL BY: 0 YES 0 NO Date: Date: Eng. Div. July 198'. IMAL. Na -G&Sl�` Aw4wvvw&wgvcOTcww 6217 AV, VO U L- Addendum, to, CitV' of' Edzends Right� of Way� Permit: ApplicatiorT. Submitted by: Kew y-*&-Ish �2t,—,,4AW "U�AAD Engineering Aide Washington Natural Gas 622-6767 x2761 pager Po. . ws 8 15 Mercer -St. (P 0. Box 1869). Seattle. WA 98111 (206) 622-6767 APPLICATION for The City of Edmonds SIODE SEWER PIM .awtoArovT 00ENEW CONSTRUCTION ;J�REPAIRS law OWNER ------ ADDRESS ........... D EASEMENT No. CONTRACTOR ....................................... PERIM No. - 7-1�41 LEGAL DESCRIIMON: LOT No. ---------------------------------------- BLOCK No . ......................... lev — 1-5-0 NAME OF ADDITION . .... A&eeu,� ............................ . . A.... 04 APPROVED SEP 2 9 1969 A.pproved: DATEA6 .. 74-4--j ---------------- B�- ------ i �-- - 7-a- --�- - �- ------ ..... CITY OF EDMONDS CIVIC CENTER — WATER -SEWER DEPARTMENT Call a PRospect 6-1107 when work Is re dy for inspection. (No Inspec. ur Ions Sat day, Sunday or holidays.) N? 3181 SIDE- SEWER PERMIT ADDRESS ........... Z9430 - 82nd Ave. West ......................................................................................................................................................................................... OWNER ............... Tbpm4�q ... Rt .... ajnXi ddle ............................ CONTRACTOR ................. 5M!_aafp� Perinission is granted ............... S.ept....29 ......... ifig_., for ........................ days to REPAIR or CONNECT a side sewer iiith City Sewers In accordance with application oil file and governing ordinances. ATTENTION IS CALLED TO THE FOLLOWING: NOTE No. I —The owners of the property may obtain a permit to construct sewer Inside property line. A licensed Side Sewer Contractor must be employed to construct side sewer In street area. Do not cover any portion of sewer before it has been inspected. NOTE No. 2—Obtain full Information regarding Ordinance 11.16.030 and Regulations governing side sewers when you get permit. NOTE No. 3—Top of side sewer must have at least 30 inches coverage at property line and 1� Inches inside property line; minimum grade of 2%. No bends in grade sharper than 1/s will be permitted. NOTE No. 4—Trenches In street must be water settled and surface of street restored to original condition. Contractors shall be responsible for failure due to improper work which may develop within one yeax of completion. NOTE No. S—It is unlawful to alter or do any other work than is provided for in the permit, or to do any work on the main sewer or its appur- tenances except to Insert the pipe Into the wye.