20800 72ND AVE W.PDFiiiiiiiiii * lill
15994
20800 72ND AVE W
J J
CITY OF EDMONDS
18 9 0 19
Address of Construction:
Property Legal Description (Include all easements):
Owner and/or Contractor:
State License No.
0 Single Family
0 Multi -Family (No. of Units-)
El Commercial
xPublic ,
SIDE SEWER PERMIT
PERMIT f\](' 3983
0
F,
Building Permit No.
Invasion into City Right-9f-Way: M401 El Yes
RW Construction Permit If
Cross other Private Property: V No7Wes
Attach legal description and copy of recorded easement
I ce.rtify that �+ave read and shall comply with all city require.ments
as indicatedfo(n the back of the Permit Card.
C�?>
Date
CALL DIAL -A -DIG (1-800-424-5555) BEFORE ANY EXCAVATION
OFFICE USE ONLY
FOR INSPECTION CALL-;74�, PUBLIC WORKS DEPT.
77/-0,:;LZ,5
Permit Fee: 42 (0 Issued By 71- -
Trunk Charge: Date Issued: -79
Assessment Fee: Receipt No.:
Lid No.:
Partial Inspection: Date -Initial -
Comments
Reason Rejected:
Initial
Final Inspection Approved: Date- Initial __1i71111r
PERMIT MUST BE P0S1KWmQNnsM
White Copy: FiNe Green Copy: trispector Buff Copy: Ap'plicant
Revised 3190
4
rn
The City of Edmonds
Water Service Drawing
EASEMENTNO . ............................................
NEW CONSTRUCTION 09 REPAIRS E) LID NO . .................. . ASMT. NO . ..................
OWNER— ................................................................. ...........................
7 J� ..........
B ADDRESS 2018CX�
JO
2 " P. P.-g.
I' F�qa .1
P%4EXCIZ
I 1J.'s,
Vcappae
2:
PERMI I NQ . ....................
CONTRACTOR.................................................................... . .
LEGAL DESCRIPTION: LOT,.N0 . ...................................... BLOCK NO . ....................................
. .. .............
.......................................... ..................................................................................................... ..
NAMEOF ADDITION ............................................. ..........................................................................
240 8 C(O '7 2 rA D Av e - \A/ -
NOTICE: No WARRANTY OF ACCURACY. The koloodon shown an the
atiched map was oompiled for use by the CRY d Edmonds. Its "00ye"
and consultants. The City ot Edmonds does not warrant the a=ffacY Of
amything sd torth on the map. Any person or entity requesting & cOPY
should conduct an independent lnqtdry regarding the information shown on
#" man irAulnn W rint limited to. the location of arri sewer " shOJIL
Such sewer sbibs may or may not exist and may or may not exist at Me
location shown. Neither the City of Edriznds nor its employees or officOrS
shall be liable toi the information givOl. on this map, no; for any oral
tepesantadon provided based upon said map.
PMV.0001-1 1175 (REV.1 1178)
2. 0
do Z I r
2.()'802- 7 1 N D AW. W.
A ed-
mwj';�� ....................
DA'I'r'. 1. .... //.,L-19-2�.... By
4
(n
The City of Edmonds Water Service Drawing EASEMENT NO . ............................................
NEW CONSTRUCTION REPAIRS [:3 LID NO . .................. . ASMT. NO . ..................
PERMIT NO . ....................
OWNER................................................................................................ CONTRACTOR ................................................................ . . ... . .. ...
LEGAL DESCRIPTION: LOT. NO . ...................................... BLOCK NO . ....................................
B ADDRESS ....... ...........
JO
.......................................... .................................................................... ..................................................
F4�
A" P. FE,
2 " P. 1%y.
I' r'q* -,
merea
2. "cap Pee
2:
NAMEOF ADDITION ..: .....................................................................................................................
20SOO '7.ZtAio Ave-W.
NOME, NO WARRAM OF ACCURACY. The Madon shown On 00
abdod mp was compled for M by to C4 d Edmonds. Its
and consultants. Tho City of Eftonds don not warrant the Accuraq of
affithing set forth on dw map. Any person or entity requesting & COPY
should owiduct an independent Inquiry regarding the Information shown on
th man i"Ann tut rVi Gn*ad ta ft 10Cati0n Of aM sewer Stub St"M
..." -'---jtjj'rnay or may not exist End may or may not exist at U*
Such sewer
imton shown. Neither the City ot Edmonds nor its omployM Or Offims
shall be liable tor the inform --tor
*' n nr this map, no; for any oral
jepeswWon pranded based upon U&J IMP
PW�I-0001 .11/75 (REV.1, 1178) 2-0 8 -r" S-T. sw.
C/O
2 "P. F— —"",4 0
1 - V
2-70
t
3'15r2"C'*PP*Q
'71ND AN. W.
A ed-
AW";K�
DAT',
....................
.... BY
.'�J9
94.
j 7 1995
FgING
Turnberry Lane Condominiums
208'hStreet Southwest & 7rd Avenue West
EDMONDS, WASHINGTON
e
STORMWA TER MANAGEMENT REPORT
Prepared by. -
Washington Land Design
9709 Third Avenue N.E., Suite 203
Seattle, Washington 98115
(206) 522-9510
FAX.- (206) 522-8344
FEX—PIR-ES 7/7/14,
July 18,1997
Revised October 28, 1997
Revised December 12, 1997
Revised December 29, 1997
Revised Januafy 23, 1998
.1c fvr
sm;e
e. 1 &Ao
TABLE OF CONTENTS
VicinityMap ..................................................................................................................... 1
ProjectNarrative .............................................................................................................. 2
Project Description
Existing Conditions
Proposed Storm Sewer System
Stormwater Detention
Stormwater Quality
Conveyance
ExistingConditions Map ................................................................................................. ;.5
ProposedCondition Map ........................................................................... ...................... 7
Stormwater Runoff Hydrographs ..................................................................................... 9
I 0-Year, 24 Hour Design Storm
1 00-Year, 24 Hour Design Storm
Flow Control Structure Calculations .............................................................................. 16
1 0-Year, 24 Hour Design Storm
1 00-year, 24 hour Design Storm
Stormwater Conveyance Calculations ............................................................................ 22
FlowControl Detail ......................................................................................................... 24
Coalescing Plate Structure Detail .................................................................................. 26
CurveNumber Calculations ........................................................................................... 28
Time of Concentration Calculations ...................... I ........................................................ 30
Tumberry Lane Condominiums
July 18,1997
Revised January 23, 1998
t
. . ............. tit) <
VM"mf Rf H.; NQIJ y V!!WLAN�) I ��L '7-1 wy
r 1 981 1
N P1 I
r WrX)!AfR1 "1 114, Of 1A
. , * i x : ; : I
BRACKHTS -199!tt � � S �, ,,w I -
S I w t I N.� - I '? ,
-�ST INICIPAL
LANDI AC
Bi* N -it '410 �1'111. yy !..I MON.—. sw lot rotwif
?UOTH S1 w
J] ST ,I
jAI I R Wy p EL"*,MDS
202- —
ST
202ND
ZI %if RRA 'I ; C04"ITY
RD A.
ST '.W Pi�. Sw
;;i I N V L
?03RO ST W COLLEGE
!1AI I Y
S w
2
'L
SW
CIR Y'RA(tl �.w
";PLAYFUJI, i,
PINE
r
RIDIW
C rif
COt L [Gf PtArF
Si PK �T,�W: mid
05 KALD
J
VRIVjhG Rolilrif
S
I.
Z01111 ST
MA N ;t,'.. Pl. !sW
I i PO
ST I .,. - :
7 1w
I)AY 104; Will f:
209TH P1 I
WMIAL 210il ST sw
o-MAPLI vosr
sw I
AL F ST PK�
WAINUI' PAW
ST -I I Tit ST .w -
H --2
CLOA SI
WWII.
WY
.T
�pw
X; I A'Am. - RU p1*111 PARK
�T-- bp� -I- < ?13TH PL.,
TY pq a K J� SW jTH. P PL W-\
2 1 1 It.
214TH PL W 0 i RIDE
2141m pl
215TH ST ?14!i; S.
SW
P; fw
ST f
r
ST Sw
Plitt T 2,16114
ST SW
A 216TY-
.717TH 14 640f)
Sw
(w
AR
K
?13 /
TH PL P
,w W, RIDE
Sw
Sw
I It
6
LIM
1?OTH ST sw �w
220TH Sr
*ITCOM —:71. P
P,
4_�
r P, VILP
*4
PIP
I Silt RAM
All I'j VA RK
PK
2? 11
I ko,
0
71
rs,
PROJECT NARRATIVE
PROJECT DESCRIPTION
The proposed project is on a 1.20 acre parcel to be redeveloped into a condominium
complex. This project consists of the construction of four two-story buildings, parking,
landscaping, stormwater conveyance/detention, utility improvements, and site grading
to accommodate these improvements. The three existing on -site buildings (3,560 SF,
1202 SF, and 1,061 SF in area) will be demolished to accommodate the proposed
development.
The stormwater quantity and quality management system for the project has been
designed in accordance with applicable requirements of the Washington State
Department of Ecology Stormwater Manual and the City of Edmonds Storm Drainage
Ordinances.
EXISTING CONDITIONS
The site is located adjacent to the northwestern corner of the intersection of 208 th
Street SW and 72 nd Avenue W. On the existing site is a small private school. The
overall site topography slopes from the northeastern portion of the property to the
southwestern portion. The existing grades vary between 427 feet and 413 feet above
mean sea level. Refer to the attached sketch of the existing site conditions.
PROPOSED STORM SEWER SYSTEM
Stormwater quality and quantity management has been designed in accordance with
applicable requirements of the Washington State Department of Ecology Stormwater vfoijs
Manual. all 1*" OC
The proposed stormwater management system is designed to detain and treat the
stormwater runoff for the areas subject to vehicular traffic. The detention system will
consist of an underground detention pipe and a flow control structure which is to be
located in the southeastern portion of the property. Detention of the increase in runoff
due to the development of the site is addressed in the Stormwater Quality and
Stormwater Detention sections of this report.
The conveyance calculations for the storm system have been based upon the 25-year
design storm as calculated using the SCS method as implemented in Waterworks
software by Engenious Systems, Inc. The proposed drainage system is composed of
curb and gutter, catch basins, and underground storm drainage pipe.
'41
Tumberry Lane Condominiums
July 18,1997
Revised January 23,1998
STORMWATER DETENTION
Stormwater. runoff will be detained and released at or below the pre -developed runoff rates
Runoff will be conveyed through an oilfwater separator and then into the proposed extension
of the public storm drainage system in 72nd Avenue W.
DETENTION
The stormwater runoff is conveyed to the on -site underground detention pipe. The
stormwater detention system has been designed to provide detention for the peak runoff for
the 10 and 1 00-year, 24 hour storm eve ' nts based upon the SCS methodology as directed by
the City of Edmonds. Curve numbers used in determining the design storms have been
based upon available soils information..
The pre- developed (existing) 1 0-year and 1 00-year, 24 hour discharges for the entire site
are 0.24 els and 0.49 cls respectively. The detention calculations for the stormwater
management system have been based upon the SCS method as implemented in Waterworks
software by Engenious Systems, Inc., and are provided in the Appendix. The table below
summarizes the detention analysis.
Pervious. Area
0.34 AC
Impervious Area
0.86 AC
Existing 10yr peak flow
0.24 cfs
Existing 1 00yr peak flow
0.49cls
Proposed I Oyr peak flow*
0.47 cfs
Proposed 1 00yr peak flow*
0.75 cfs
*Proposed peak flow before detention
STORMINATER QUALITY
OILIWA TER SEPA RATION
The. stormwaterrunoff which is subject to vehicular shall be treated after it has been
detained. Although other BMP's for water quality are preferred, an oil/water separator
was selected due to space constraints. The oil/water separator has been sized to treat
the 1 0-year, 24 hour storm.
3
Tumberry Lane Condominiums
July 18, 1997
Revised January 23, 1998
Existing Conditions Map
17
L
ri
ti M3 V;4A) Ili III
LL - --- - - - - -
T -1
J�
tfit"g
GRAPHIC SCAtE
T
. . .. .........
0. "" I
- . 10
an- WB�Ii 4,-, - - -
PlAnning & fngineenng 208th STREET CONDOMINIUMS
EDMONDS. WASHINGT� EXISTING CONDITIONS
IL-k, WA F3 I
95811
0
0
Proposed Condition Basin Map
Turnberry Lane Condominiums
Juty 18,1997
Revised December 29,1997
9
I
N . DATE By REMSION DESCRIPTION DESCMD fly: ISSLIE DAir: Ington
D" 81: Marudng & En#r-wing TURNBEARY LANE CONDOMINIUMS
PROPOSED CONDITIONS
PROICI No EDMONDS, WASHNGTON
Stormwater Runoff Hydrographs
Tine in Hours
Hyd
No.:
28
Rate:
0.25
cfs
Time:
8.33
hr
Vol
0.08
Ac-ft
Int:
1.0.60
min
Hyd
No.:
28
Rate:
0.29
cfs
Time:
8.50
hr
Vol
0.11
Ac-ft
Int:
10.00
min
Hyd
No.:
-28
Rat�e:
0.43
cfs
Time:
8.3 3
hr
Vol
0.15
Ac-ft
Int:
10.0b
min
Hyd
No.:
28.
Rate:
0.17
cfs
Time:
8.33
hr
Vol :
0.06
Ac-ft
Int:
10.00
min
Time in Nmrs
Hyd
No.:
28
Rate:
0.39
cfs
Time:
8-17
hr
Vol
0.13
Ac-ft
Int:
10�.00
min
Hyd
No. :
28
Rate:
.0.55
cfs
Time:
8.50
hr
Vol
0.19
Ac-ft
Int:
10.00
min
Hyd
No.:,
28
Rate:
0.70
cfs
Time:
8.17
hr
Vol
0.24
Ac-ft
Int:
10.00
min
Hyd
No.:
28
Rate:
0.30
cfs
Time:
8.33
hr
Vol :
0.11
Ac-ft
Int:
10.00
min
1/23/98 page I
Turnberry Lane Condominiums
Edmonds, Washington
BASIN SUMMARY
PE vpc-wvlv
BASIN ID: l00YRDTN NAME: 100 YEAR 3@q4"N@W
SCS METHODOLOGY
TOTAL AREA ....... : 1.20 Acres BASEFLOWS: 0.00 cfs
RAINFALL TYPE .... TYPEIA PERV RVIP
PRECIPITATION .... : 3.00inches AREA..: 0.34Acres 0.86Acres
TIME INTERVAL .... 10.00 min CN .... : 92.00 98.00
TC .... : 5.00 min 5.00 min
ABSTRACTION COEFF: 0.20
TcReach - Shallow L: 50.00 ks: 11.00 s:0.0500
impTcReach -Sheet L: 115.00 ns:0.01 10 p2yr: 1.50 s:0.0005
PEAK RATE: 0.75 ds VOL: 0.25 Ac-ft TIME: 490 min
BASIN ID: 100YREX NAME: 100 YEAR E)CISTING STORM
SCS METHODOLOGY
TOTAL AREA ....... : 1.20 Acres BASEFLOWS: 0.00 cfs
RAINFALL TYPE .... TYPEIA PERV HAP
PRECIPITATION .... : 3.00inches AREA..: 1.04Acres 0.16Acres
TIME INTERVAL .... 10.00 min CN .... : 86.00 98.00
TC .... : 12.89 min 5.00 min
ABSTRACTION COEFF: 0.20
TcReach - Sheet L: 300.00 ns:0.0600 p2yr: 1.50 s:0.0400
TcReach - Shallow L: 50.00 ks: 11.00 s:0.0500
impTcReach - Sheet L: 115.00 ns:0.01 10 p2yr: 1.50 s:0.0005
PEAK RATE: 0.49 ds VOL: 0. 17 Ac-ft TIME: 5 10 min
1/23?98 , page 2
Turnberry Lane Condominiums
Edmonds, Washington
BASIN SUNffvbkRY
VEVO"Fwp
BASIN ID: IOYRDTN NAME: 10 YEAR DgWakW2150
SCS METHODOLOGY
TOTAL AREA ... ; ... : 1.20 Acres BASEFLOWS: 0.00 cfs L4000,
RAINFALL TYPE .... TYPEIA PERV ff%4P
PRECIPITATION .... : 2.00inches AREA..: 0.34Acres 0.86Acres
TIME INTERVAL .... 10.00 min CN .... : 92.00 98.00
TC .... : 5.00 min 5.00 n-dn
ABSTRACTION COEFF: 0.20
TcReach - Shallow L: 50.00 ks: 11.00 s:0.0500
impTcReach -Sheet L: 115.00 ns:0.01 10 p2yr: 1.50 s:0.0005
PEAK RATE: 0.47 cfs VOL: 0. 16 Ac-ft TIME: 500 min
BASIN ID: 10YREX NAME: 10 YEAR 0USTING STORM
SCS METHODOLOGY
TOTAL AREA ....... : 1.20 Acres BASEFLOWS: 0.00 cfs
RAINFALL TYPE .... TYPE I A PERV RAP 40/0"
PRECIPITATION .... : 2.00 inches AREA..: 1.04 Acres 0. 16 Acres
TRAE INTERVAL .... 10.00 min CN .... : 86.00 98.00
TC .... : 12.89 min 5.00 min
ABSTRACTION COEFF: 0.20
TcReach - Sheet L: 300.00 ns:0.0600 p2yr: 1.50 s:0.0400
TcReach - Shallow L: 50.00 ks: 11.00 s:0.0500
impTcReach -Sheet L: 115.00 ns:0.01 10 p2yr: 1.50 s:0.0005
PEAK RATE: 0.24 cfs VOL: 0.09 Ac-ft TIME: 5 10 min
Flow Control Structure Calculations
1/23/98 page 5
Tumberry Lane Condominiums
Edmonds, Washington
STAGE DISCHARGE TABLE
MULTEPLE ORIFICE H) No. OREFICE
Description: ORIFICE
Outlet Elev: 411.80 *0
Elev: 409.80 ft Orifice Diameter: 2.3400 in. OV
Elev: 414.50 ft Orifice 2 Diameter: 2.2500 in.
STAGE <--DISCHARGE---> STAGE <--DISCHARGE --- > STAGE <--DISCHARGE --- > STAGE <--DISCHARGE >
(ft) --- cfs -- ------- (ft) --- cfs -- - ----- (ft) --- CA -- ------- (ft) --- cfs--
411.80
0.0000
413.10
0.1694
414.40
0.2396
415.70
0.4439
411.90
0.0470
413.20
0.1758
414.50
0.2442
415.80
0.4538
412.00
0.0665
413.30
0.1820
414.60
0.2921
415.90
0.4634
412.10
0.0814
413.40
0.1880
414.70
0.3145
416.00
0.4728
412.20
0.0940
413.50
0.1937
414.80
0.3326
416.10
0.4819 0000'
412.30
0.1051
413.60
0.1994
414.90
0.3485
416.20
0.4908
412.40
0.1151
413.70
0.2048
415.00
0.3630
416.30
0.4995
412.50
0.1243
413.80
0.2101
415.10
0.3763
416.40
0.5081
412.60
0.1329
413.90
0.2153
415.20
0.3889
416.50
0.5164
412.70
0.1410
414.00
0.2204
415.30
0.4009
416.60
0.5246
412.80
0.1486
414.10
0.2254
415.40
0.4123
416.70
0.5327
412.90
0.1558
414.20
0.2302
415.50
0.4232
416.80
0.5406
413.00
0.1628
414.30
0.2349
415.60
0.4337
a / 0 0
1/23/98 page 7
Tumberry Lane Condominiums
Edmonds, Washington
--------------
LEVEL POOL TABLE SUMMARY
MATCH INFLOW -STO- -DIS- <-PEAK-> STORAGE
<---DESCRIPTION----> (cfs) (cfs) --id- --id- <-STAGE> id VOL (cf)
10 YR ........................ 0.24 0.47 PIPE FLCTRSTR 414.49Y 613.77 cf
100 YR ....................... 0.49 0.75 PIPE FLCTRSTR 416.2 2 1046.16 cf
MEMMMMEW
1123/98 . page 4
Turnberry Lane Condominiums
Edmonds, Washington
STAGE DISCHARGE TABLE
COMBINATION DISCHARGE ID No. FLCTRSTR
Description: FLOW CONTROL STRUCTURE
Structure: ORNME Structure:
Structure: WEIR Structure:
Structure:
STAGE <--DISCHARGE --- > STAGE <-DISCHARGE --- > STAGE <--DISCHARGE --- > STAGE <--DISCHARGE
(ft) --- cfs -- ------- (ft) --- cfs — — ----- (ft) --- cfs -- ------- (ft) --- cfs -- -------
----------- ----------
411.80 0.0000 411.90 0.0470 412.00 0.0665 412.00 0.0665
1/23/98 page 6
Turnberry Lane Condominiums
Edmonds, Washington'
STAGE DISCHARGE TABLE
BROAD CRESTED WEIR ID No. WEIR
Description: OVERFLOW WEIR
cd: 3.2 100 Weir length: 1.0000 ft.
El: 416.75 ft. Weir Increm: 0. 10
STAGE <--DISCHARGE --- > STAGE <--DISCHARGE --- > STAGE <--DISCHARGE --- > STAGE <--DISCHARGE >
(ft) --- cfs -- ------- (ft) --- cfs -- ------- (ft) --cfs -- ---- — - (ft) --- cfs -- -------
416.75 0.0000 416.80 0.0402 416.80 0.0402 416.80 0.0402
1/23/98 page 3
Tumberry Lane Condominiums
Edmonds, Washington
----------
STAGE STORAGE TABLE
UNDERGROUND PEPE ID No. PEPE
Description: DETENTION PEPE
Diameter: 5.00 ft. Length: 57.00 ft.
Slope ... : 0.0000 ft/ft upstr: dnstr:
STAGE < ---- STORAGE ---- > STAGE< ---- STORAGE ---- > STAGE< ---- STORAGE ---- > STAGE< ---- STORAGE >
(ft) --- cf--- --Ac-Ft- (ft) --- cf --- -- Ac-Ft- (ft) ---cf--- --Ac-Ft- (ft) --- cf--- --Ac-Ft-
411.80
0.0000 0.0000
413.10
231.23 0.0053
414.40
588.09 0.0135
415.70
936.63 0.0215
411.90
5.3417 0.0001
413.20
256.53 0.0059
414.50
616.54 0.0142
415. 80
959.84 0.0220
412.00
15.016 0.0003
413.30
282.39 0.0065
414.60
644.89 0.0148
415.90
982.20 0.0225
412.10
27.416 0.0006
413.40
308.75 0.0071
414.70
673.11 0.0155
416.00
1004 0.0230
412.20
41.945 0.0010
413.50
335.55 0.0077
414.80
701.14 0.0161
416.10
1024 0.0235
412.30
58.247 0.0013
413.60
362.73 0.0083
414.90
728.94 0.0167
416.20
1043 0.0239
412.40
76.074 0.0017
413.70
390.25 0.0090
415.00
756.46 0.0174
416.30
1061 0.0244
412.50
95.237 0.0022
413.80
418.05 0.0096
415.10
783.64 0.0180
416.40
1077 0.0247
412.60
115.59 0.0027
413.90
446.08 0.0102
41�.20
810.44 0.0186
416.50
1092 0.0251
412.70
136.99 0.0031
414.00
474.30 0.0109
415.30
836.80 0.0192
416.60
1104 0.0253
412.80
159.35 0.0037
414.10
502.66 0.0115
415.40
862.66 0.0198
416.70
1114 0.0256
412.90
182.56 0.0042
414.20
531.10 0.0122
415.50
887.97 0.0204
416.80
1119 0.0257
413.00
206.55 0.0047
414.30
559.60 0.0128
415.60
912.65 0.0210
Stormwater Conveyance Calculation
Tumberry Lane Condominiums
July 18,1997
-Revis� December 29,1997
Washington Land Design
Planning Engineering
-7
Project: w'q Date: IIVA? 7
Description: By: WFX-
o44&- xw --
7e.. VAAB /CC-m- 24HA.-
C40 XOA-
,444 sr-z.,;we
6; y
0 , ±-�f- '/Z -r/.t
I"P%- -5-. rp- '4
10700 Meridian Avenue North, Suite 503, Seattle, Washington 98133 (206) 365-9510 Fax: (2-06) 365-0225
Flow Control Structure Detail
Turnbe--v Lane -Condominiums
, :'r .. . . , -
SOLID COVER
RIM EL 418.0'
2 � TYPE 2, 54" 0
CATCH BASIN
STEPS OR
LADDER
GASKET (TYP.)
SHEAR CATE
36"0 IN
N
us
ml
IE OU
1.80 Aw
--All 1 q8O�
IE = 411.80
SLEEVE COUPLING
NON7SHRINK GROUT
WELDED STEEL PLATE W/
2.35" DIA. ORIFICE (#I)
54" o
FLOW CONTROL STRUCTURE
SCALE 1"=2'
1 46
TOP OF RISER
416.8
2-GALV.STEEL
STRAPS
2.35" DIA. ORIFICE (#2)
EL = 414-50
(WITH DOWN -TURNED ELBOW)
-18" RISER
12"MAX.
3"MIN.
12"0 OUT
FLEXIBLE
ADAPTER
COUPLING
2-GALV.STEEL
STRAPS (TOP
.AND BOTTOM)
0
Coalesing Plate Structure Detail
Tumberry Lane Condominiums
660-CPS.
OIL / WATER SEPARATOR
768 SO. FT. - EFFECTIVE COALESCING AREA
415 G.P.M. - MAXIMUM PROCESS FLOW
COVER 4'-8"
No. 64-2-342P
1,200 lbs.
-�7 !T---�Ti -7-7!T'- 6-8"
LITIT-7- -
!Ti T17 1-Z 17
-7-
_717
7
1T
71 - - - - - - - - -- - - - -
- - - - - - - - - - - - - -
-- - - --- - - - - - - - - -
- --- - - - - - - - - - - - - - - - --
- - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - -- - -
- - - - - - - - - - - - - - -
- - - - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - -
OUTLET PIPE
WITH SAMPLING TEE
BY OTHERS
FIBERGLASS
HOLD-DOWN CHANNEL
BASE ASSEMBLY
No. 660-CPS
6,300 lbs.
>
OUTLET WEIR
INLET PiPE
W;TH ELBOW
OIL RETAINING BAFFLE BY OTHERS
.7�
c i
5'-6*
.0 i<
COALESING MEDIA 4,_01
INLET WEIR -
ITEMS SHOWN ARE SUBJECT TO CHANGE
WITHOUT NOTICE.
FOR DETAILS SEE R EVERSE SIDE.
4
0
Washington Land Design
Project: Planning * Engineering Da I te: 117-Z /?Y-
k/4
Description:
.6 IVa By: W4:7:
DOC
TOIG� -rXimm.. fir - Z 3'
.-oQ77, A4EZD- Yr
Oki: 14 Alxia Ow WAMSAg-
IJ t
:30
- 7-14NIIw4-TIS-
. r�.V i r.WAa- M IW.WVA5b ---,J
ZFsa
USV-=P 2-/
-n--e-w-b ' !ry W10
-'rAWL'&r - AP40 -4
U-470 C-O^V-Ar-K JW rIJ& PUMX.�
rme sw� CT
.:XT %&&nrAkW -r44-: 04"W4b
:PAW"eJ=- A AlMall G;4WVA&C> WAMIZ. 71,08le
r-1114 "w- C'X-7y -F ."
~ft Y2[--D AS "-COACA C&OW7W
P'itlramwD S�E AffbVV
14144-MOb AS' 0- C?PFOJ
Cc
Z
10700 Meridian Avenue North, Suite 503, Seattle, WaMiington Xs 133 (206) 365-9510 Fax: (206) 365-0225
STORMWATZR MANAGEMENT MANUAL FOR THE PUGET SOUND BASIN
SOU Ty"
Hydroiasia Sad
am"
Sad Type
Hydraktic SW
Grow
M90011405
a
sp"Way
AIS
N! 4, ")
B
Sprint"
B
Nooback
C
sularver
N==
CID
311kon
C
Ovarty
C
subm variant
B
Ok"
KD
SIRENS
C
Okianount
C
4--alft-
ND
Oly
B
T80011011
D
Ones
D
Taawax
ND
Oridis
D
T"ImAkit
ND
Ortirw
ND
Tenino
C
080
C
riach
D
Ovau
C
Takul
ND
Foofik
C
Townsend
C
fteemy
C
Tribm
ND
Pbsbas
ND
TvkWds
D
PUsbuck
C
Tuhay
ND
Polak"
C
urnm
Vari"
Podobo
C
Vaikon
8
P"dor
C
Ve"
C
P"K
D
WWO10
ND
Pay
B
Wardes
B
Quests
ND
Wbidbey
ND
QW3108110
ND
Wi1kesen
B
14810W
B
WLft1aW
A
Raimieff,
C
woodinv&
B
Room
a
YdM
C
aded
ND
ZY&W
Hydrologic Sail Group Classifications
A. (Low runoff potential). Soils having high infiltration rates, even when
thoroughly wetted, and consisting chiefly of deep, well -to -excessively drained
sands or gravel*. These soils have a high rate of water transmission.
B. (Moderately low runoff potential). Soils having moderate infiltration rates
when thoroughly wetted, and consisting chiefly of moderately fine to moderately
coarse textures. Theme soils have a moderate rate of water transmission.
C. (Moderately high runoff potential). Soils having slow infiltration rates when
thoroughly wetted, and consisting chiefly of soils with a layer that impedes
downward movement of water, or soils with moderately fine to fine textures.
These soils have a slow rate of water transmission.
D. (High runoff potential). Soils having very slow infiltration rates when
thoroughly wetted and consisting chiefly of clay soils with a high swelling
potential, soils with a permanent high water table, soils with a hardpan or
clay layer at or near the surrac-e—, -and shallow soils over nearly impervious
material. These soils have a very slow rate of water transmission.
ND Data not currently available for this mail type.
*From SCS, TR-55, Second Edition, June 1986, Exhibit A-1. Revi-sro—ne made from
SCS, Soil Interpretation Record, Form #5, September 1988 and various county scf."
survey*.
III-1-10 FIBRUWY, -19TY
17. Erosion -and Sediment . rem#-nt -
Financial Liability. Performance bonding, or other
appropriate financial instruments, shall be requir-ed
for all projects to ensure compliance* with the
approved erosion and sediment control plan.
I I-XIOXIIXIN IJVJ ZI IRN ST M e I kw.,% 94"(41713 MINA e I DIA 0 D_XV
N110i 014'VT am-741-:3 -.1091VA 4 V-16WOIIR#.V
A. Any new development or redevelopment with more than
2,000 square feet of new impervious surfacing shall be
required to provide stonn water quality control.*
Compliance will be demonstrated by implementing an
approved Storm Water Site Plan. Guidelines for Storm
Water Site Plans are provided in the manual. The plan
must address the following requirements, in addition to
ESC requirements.
SOC Minimum Rgguirement - Storm Water
Detention/Strearnbank Erosion Control. Storm
water discharges shall control stream bank erosion
and flooding of the downstream storm system by
limiting the peak rate of runoff from the site. The
predevelopment condition for all cases other d=
open water bodies shall be considered meadows or
young second growth forest. As the first priority to
meet this requirement, BMPs shall udH=
infiltration to the fullest extent practicable only if
site conditions are appropriate and ground water
quality is protected. Due to high ground watcr
tables in large portions of the City and a landslide
complex in the Meadowdale area (where high
ground water increases the slide hazard), there are
few sites within the City where infiltration should
be considered., Exhibit B delineates the areas where
infiltration may be feasible for this requirement if
the site satisfies the requirements outlined in the
Manual. BMPs shall be selected, designed, and
maintained according to the Manual. The minimum
diameter orifice size used for control shall be 5/8 of
an inch. In the case of redevelopment, this
requirement shall apply only. to that portion of the
site that is being redeveloped. Any development or
redevelopment that has less than 5,000 square feet
UMA -13-
-STORNWATIR MANAGEMENT MANUAL FOR THE PUGET BOUND BASIN
Table 111-1.3 SCS Western Washington Runoff Curve Numbers
(Published by SC8 in 1982) Runoff curvenumbers for selected agricultural,
suburban and urban
I --A --� fo%w Rkirrum 11 va4nfall Mai-9-4htit-inn- IA-hnur mtnrm duratinn-
LAND
USE DESCRIPTION
CURVE NUMBERS BY
HYDROLOGIC
SOIL GROUP
A
8
C
D
Cultivated land(l):
winter condi tion
86
92
94
95
Mountain open a roast
low growing brush grasslands
74
82
89
92
Meadow or pasture:_
65
78
85
89
Wood or forest landt
undisturbed
42,
64
76
81
wood or forest land:
young second growth or brush
55
72
81
86
Orchard:
with cover crop
81
88
92
94
Open spaces, lawns,
parks, golf courses, cemeteries,
landscaping.
Good condition:
grass cover on 05% of the
68
80
86
90
area
Fair condition:
grass cover on 50-75% of
77
85
.90
92
the area
Gravel roads & parking lots:
76
85
89
91
Dirt road's &parking
lots:
72
82
87
89
impervious surfaces,
pavement, roofs etc.
98
98
98
98
otmn water bodies:
lakes, wetlands, ponds etc.
100
100
100
100
single family residential(2):
Dwelling Unit/Gross
Acre %Impervious(3)
Separate
curve
number
1.0 DU/Qh
15
shall be
selected for
1.S DV/QA
20
pervious
G impervious
2.0 DU/GA
25
portions
of the
site
2.S DU/GA
30
or
basin
3.0 DU/GA
34
3.5 DU/GA
38
4.0 DU/GA
42
4.5 DU/GA
46
5.0 DU/GA
48
5.5 DU/GA
50
6.0 DU/GA
52
.6.5 DU/GA
54
7.0 DU/GA
56
PUD's, condos, apartments,
%impervious
cottimercial businesses must be
Industrial areas
computed
(1) For a more detai led description of agricultural land use curve numbers refer
to National Engineering Handbook, Soc..4, Hydrology, Chapter 9, August 1972.
(2) Assume@ roof and driveway runoff in directed into strost/storm system.
(3) The remaining pervious areas (lawn) are considered to be in good
condition for these curve numbers.
111-1-12 FEBRUARY, 1992
EXHIBIT 8
CitY of Edmonds
0
Washington Land Design
Planning Engineering
Project:
Description:
Date: /2/�V/17
By: V,4::F-
14abe 7Wr— av- =-e: z--V mrpgo r.
V
-J'w6'w
12-111. A 0. T# ,w 12.-75—,,
10700 Meridian Avenue North, Suite 503, Seattle, Washington 98133 (206) 365-9510 Fax: (206) 365-0225
Washington Land Design
Planning Engineering
Project:
Description:
CO. 0 z
r
4
v
Date:
By:
25
, -, -w --ot lulat, nwrime ivorm, 3utte .5U.3, 5eattle, Washington 98133 (206)365-9510 Fax:(206)365-0225
CITY OF EDMONDS HARVE H. HARRISON
MAYOR
200 DAYTON ST. - EDMONDS, WASHINGTON 98020 * (206) 771-3202
OFFICE OF THE CITY ENGINEER
December 21, 1981
Mr. Gary A. Nelson
9710 Wharf Street
Edmonds, Wa. 98020
Dear Mr. Nelson:
W=z% lf�
tinT FILE
SUBJECT: L.I.D. 206 - SANITARY SEWER CONNECTION
RE: PROPERTY LOCATED AT 7218 208TH ST. S.W.
City of Edmonds records indicate that you are the owner
of property located in the College Place Area, and that the
..sanitary sewer service is now available to your property.
Residents abutting this sewer main are required to be connected
per Edmonds City Code (18.10.010).
In consideration of the completion of the sewer system and
the aforementioned code, you are hereby advised that you should
make arrangements to make the necessary sewer connection within
sixty (60) days.
If you have any questions, please contact Jerry Saterlie
at 775-2525, extension 259. Permit and connection information
may be obtained at the Building Department, at 505 Bell Street.
S incerely,
JAMES E. ADAMS, P.E.
City Engineer
JR: jky
1�
�01=
HOOL
S. W.
98020,
7Z/$
o4c All,
m
Rllw
I 12�
3Prl
I - 9'�)
'12C.
Date:
To:
Subject:
CITY OF EDMONDS BARBARA FAHEY
MAYOR
250 5TH AVENUE NORTH - EDMONDS, WA 98020 - (206) 771-0220 FAX (206) 771-0221
COMMUNITY SERVICES DEPARTMENT
Public Works Planning 9 Parks and Recreation e Engineering
Letter of Transmittal
February 3, 1997
Environmental Review Section
Department of Ecology
PCI-Box 47703
Olympia, WA 98504-7703
7218 208th St. SW, Edmonds (File No. ADB-96-150)
Transmitting Mitigated Determination of Nonsignificance
For Your Information: XX
As you requested:
For your file:
Comment:
Note attachments:
Sincerely,
Cc: WSDOT
Stevens Hospital
Edmonds School District
Community Transit
Robin Miller
Diane Cunningham, Administrative Secretary
9 Incorporated August 11, 1890 0
Sister Cities International — Hekinan, Japan
OV. EDAI
CITY OF EDMONDS
250 STH AVENUE NORTH, EDMONDS, WA 98020 (206) 771-0220
RCW 197-11-970 Determination of Nonsignificance (DNS)
MITIGATED DETERMINATION OF NONSIGNIFICANCE
Description of proposal: The proposed 28 unit multiple family dwelling complex, 56 parking stalls and
approximately 2,800 cubic yards of grading proposed (File No, ADB-96-150).
Proponent: Robin L. Miller, 146 3rd Ave S., Edmonds, WA 98.020.
Location of proposal, including street address if any: 7218 208th Street Southwest
Lead agency: CITY OF EDMONDS
The lead agency for this proposal has determ�ined that it does not have a probable significant adverse impact on the
environment. An environmental impact statement is not required under RCW 43.21.030(2)(c). This decision was
made after review of a completed environmental checklist and other information on file with the lead agency. This
information is available to the public on request.
There is no comment period for this DNS..
XX This DNS is issued under 197-11-340(2); the lead agency will not act on this proposal for 15 days from
the date below. Comments must be submitted by Fe- 6. 1 S( .19971.
Responsible Official: Jeffrey S. Wilson
Position/Title: Current Planning Supervisor, Department of Community Services - Planning Division
Phone: 771-0220
Address: City of Edmonds, 250 5th Avenue North, Edmonds, WA 98020
Date:
XX You may appeal this determination to Robert Chave, Planning Manager, at 250 5th.Avenue North,
Edmonds, WA 98020, no later than Mom� Lf 1997, by filing a written appeal citing the
reasons.
You should be prepared to make specific factual objections. Contact Jeffrey S. Wilson to read or ask about the
procedures for SEPA appeals.
XX Posted on Fe 6. 3 , 1997, at the Edmonds Public Library, Edmonds Community Services
Building, and the Edmonds Post Office.
XX Distribute to "Checked" Agencies on the reverse side of this form, along with a copy of the Checklist.
Page I of 2
AD96150A.DOC
1/30/97.SEPA
Mailed to the -following along with the Environmental Checklist:
XX Environmental Review Section XX
Edmonds School District No. 15
Attn.: Bret Carlstad, Planning and Property
Department of Ecology
Manager
P.O. Box 47703
Olympia, WA 98504-7703
20420 68th Avenue West
Lynnwood, WA 98036-7400
XX Washington State Dept. of Transportation XX
Community Transit
TSM&P/Land Developer
Attn.: Brent Russell
15700 Dayton Avenue North
Seattle, WA 98133
1133 164th Street Southwest, #200
Lynnwood, WA 98037
XX Stevens Memorial HospiW XX
Robin Miller
21601 76th Avenue West
146 3rd Ave N
Edmonds, WA 98026
Edmonds, WA 98020
XX MITIGATING MEASURES INCORPORATED INTO THE PROPOSAL:
I . BASED ON THE COLLEGE PLACE TRIP MITIGATION ORDINANCE, AND THE NUMBER
OF DAILY TRIPS PROJECTED BY THE TRAFFIC REPORT SUBMITTED BY THE
APPLICANT, A TRAFFIC MITIGATION FEE OF $22,616 IS REQUIRED TO BE PAID
PRIOR TO THE ISSUANCE OF THE BUILDING PERMITS FOR THE PROPOSED
PROJECT. CERTAIN STREET REQUIRED STREET IMPROVEMENT WORK MAY BE
CREDITED TO THE TOTAL MITIGATION FEE. ANY POSSIBLE CREDITS SHALL BE
DETERMINED BY THE CITY ENGINEER.
Attachments
pc: File No. ADB-96-150
SEPA Notebook
Pap 2 of 2
AD96150A.DOC
1/30/97.SEPA
of E
MEMORANDUM
Date: January 28, 1996
To: File No. ADB-96-150
From: John Bissell, Associate Planner
Via: Jeffrey S. Wilson, Responsible Official
Subject: ENVIRONMENTAL DETERMINATION FOR THE
UNIT MULTIPLE FAMILY DWELLING COMPLEX
STALLS AND APPROXIMATELY 2,800 CUBIC
GRADING PROPOSED, FILE NO. ADB-96-150
PROPOSED 28
56 PARKING
YARDS OF
I have had the opportunity to visit the site, review the environmental checklist, site plan, building
plans, and trip generation report which have been prepared for the project. A copy of these
documents are filed in the official file for this permit.
Based on my review of all available information and adopted policies of the City, I recommend
that a mitigated determination of nonsignificance be issued for the project.
The subject property is located within a transportation study area. The study, known as the Bell -
Walker College Place Transportation study, indicates that the addition of new vehicle trips
within its boundaries create specific impacts. The Study also outlines mitigations that should be
required within the transportation study area. In this case, the number of trips generated was by
the Bell Walker Study. The City has adopted the College Place Transportation Study Area as an
Environmentally Sensitive area, and has adopted the findings of this study as policy.
Based on my review of all information and adopted policies of the City, I am.recommending that
the proposal be changed or clarified to include the following mitigating measures so that a
Mitigated Determination of Nonsignificance (MDNS) can be issued.
Recommended Mitigation Measures:
Based on the college place trip mitigation ordinance, and the number of daily trips
projected by the traffic report submitted by the applicant, a traffic Mitigation fee of
$22,616 is required to be paid prior to the issuance the building permits for the proposed
project. Certain street required street improvement work may be credited to the total
mitigation fee. Any possible credits shall be determined by the City Engineer.
City of Edmonds cza Planning Division
AD96150B.DOC
01/30/97.
This recommendation is based on adopted policies of the City as found in the Edmonds
Community Development Code (ECDC). Specifically, the following apply:
City of Edmonds Ordinance 2824, College Place Traffic Mitigation
Ordinance. (see attached mitigation requirements)
These policies directly support the "above mentioned mitigation measures and require these
measures in order to fully mitigate the impacts created by the proposal. Should you have any
questions concerning the information in this memorandum, please contact me.
Review by Responsible Official
I concur:
I do not concur:
Comments:
Sj�� (At&-)
Jeffrey S. Wilson Date
Attachments
pc: File No. ADB-96-150
Page 2 of 2
AD96150B.DOC
01/3a/97.
IC)V EDAf
0,
MEIN*?,
St. I
Purpose of Checklist.
CITY OF EDMONDS
ENVIRONMENTAL CHECKLIST
The State Environmental Policy Act (SEPA), chapter 43.21C RCW, requires all governmental agencies to consider the
environmental impacts of a proposal before making decisions. An environmental impact statement (EIS) must be prepared for all
proposals with probable significant adverse impacts on the quality of the envirorunent. The purpose of this checklist is to provide
information to help you and the agency identify impacts from your proposal (and to reduce or avoid impacts from the proposal, if it
can be done) and to help the agency decide whether an EIS is required.
Instructionsfor Applicants
This envirorimental checklist asks you to describe some basic information about your proposal. Goverrimental agencies use this
checklist to determine whether the environmental impacts of your proposal are significant requiring preparation of an EIS. A�swer
the questions briefly, with the most precise information known, or give the best description you can.
You must answer each question accurately and carefully, to the best of your knowledge. In most cases, you should be able to answer
the questions from your own observations or project plans without the need to hire experts. If you really do not know the answer, or
if a question does not apply to your proposal, write "do not know" or does not apply". complete answers to the questions now may
avoid unnecessary delays later.
Some questions ask about governmental regulations, such as zoning, shoreline, and landmark designations. Answer these questions
if you can. If you have problems, the governmental agencies can assist you.
The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of time or on different parcels of
land. Attach any additional information that will help describe your proposal or its environmental effects. The agency to which you
submit this checklist may ask you to explain your answers or provide additional information reasonably related to determining if
there may be significant adverse impact.
Use of checkfistfor nonprojectproposals.
Complete this checklist for nonproject proposals, even though questions may be answered "does not apply." 114 ADDITION,
complete the SUPPLEIvENTAL SBEET FOR NONPROJECT ACTIONS q= D).
For nonproject actions, the references in the checklist to the words "project;" "applicant" and "property or site" should be read as
"proposer," and "affected geographic area," respectively.
A. BACKGROUND -
I. Name of proposed project, if applicable: 2jC)B*" Siveet SW Condorn�iumG
bob Xlepfh5er Me 5r-hroeder
2. Nameofapplicant: — Double FZ:!31e DevelopmeMs UC
3. Address and phone number of applicant and contact person:
14(o Third Avenue &Mh
ScArnards. WA qB010
ATTN: Rob Mi Iter (ZO(o) S93-02.38
CHKLTMMI-NOV-93 Page I Of24
4. Date checklist prepared: December 18, 199(0
5. Agency requesting checklist: City of Edmonds.
6. Proposed timing or schedule (including phasing, if applicable):
CQhSirUCjj0n MIA 1297
I Phases
(STAFF COMMENT
I Do you have any plans for future . additions, expansion, or further activity related to or connected with this
proposal? If yes, explain.
'N 0
(STAFF COMMENTS)
S. List any environmental -information you know about that has been prepared, orwill be prepared, dire . ctly related
to this proposal.
(STAFF COMMENTS)
9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting
the property covered by your proposal?, If yes, explain.
No
(STAFF COMME
0=T-D=-N0V-93 Page 2 Of24
MASIMPRA
10.
List any government approvals or permits that wiU be needed for your proposal, if known.
(STAFF COMMEN
11. Give brief, complete description of your proposal, including the proposed uses and size of the project and site.
There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You
do not need to repeat those answers on this page.
2 -Ud -WAI CohdoVyil6lUm
A ii r&der) - 900,__ 13501f Vilth CoVelred
?4hd SUVfA(e PAYk�hQ on A C.0.0on t Sf Sije_
(STAFF COMMENTS)
12. Location of the proposal. Give sufficient information for a person to understand the precise location of your
proposed project, including a street address, if any, and section, township, and range, if known. If a proposal
would occur over a range of area, provide range or boundaries of the site(s). Provide legal description, site plan,
vicinity map, and topographic map, if reasonably available. Wh ' He you should submit any plans required by the
agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related
to this checklist.
is louted e *y SW Corner of L08-1h 5t-5W
(STAFT COMMEN
CMUMCU-NOV-93 Page 3 of 24
UASMMM
2
TO BE COMPLETED BY APPLICANT
B. ENVIRONMiNTALILEMENTS
1. Earth
a. General description of the site (circle one):Q�offing, hilly, steep slopes, mountainous, other:
(STAFF COMMENTS)
b. What is the steepest slope on the site (Approximate percent slope)?
io Z� borji)ern edge,
(STAFF COMMENTS)
C. What general types of soils are found on the site (for example, clay, sand-, gravel, peat, muck)? If you
know the classification of agricultural soils, specify them and note any prime farmland.
szndNi qravel (latn)
(STAFF COMMENTS)
d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe.
0
Par 4 of 24
CHrXTJ=1-N0V-"
MASMSPFA
e. Describe the purpose, type and approximate quantities of any filling or grading proposed. Indicate source
of fill.
C U1 24 d 11 WA Gh-5iJkC sooil
5nme— e'%�nfj Inm be reQuilred 500 CLA-)(d.
(STAFF COMMNTS)
7-
E Could erosion occur as a result of clearing, construction, or use? If so, generally describe.
No
(STAFF COMMENTS)
g. About what percent of the site will be covered with impervious surfaces after project construction (for
example, asphalt or buildings)?
GQ—(Q070
(STAFF COMMEENTS)
h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any:
L?AhdS(A�1hQ - -And pmseniinQ PX115-hN JrecS Where possible—
J J
(STAFF COMN[ENTS)
MEMO
a. What types of emissions to the air would result from the proposal (Le., dust, automobfle, odors, industrial
wood smoke) during construction and when the project is completed? If any, generally describe and give
approximate quantities if known.
—MIWM211 -- -(Yoni Construchon
a
(STAFF COMMNTS)
CHnTD=1-NW-*3 Pap 5 of 24
MASTEMSPRA
b. Are there any off -site sources of emissions or odor that may cffect your proposal? If so, generally describe.
No
(STAFF COMMENTS)
C. Proposed measures to reduce or control emissions or other impacts to the, if any:
(STAFF COMMENTS)
3. WATER
a. Surface:
(1) Is there any surface water body on or in the immediate vicinity of the -site (including year-round and
seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If
appropriate, state what stream or river it flows into.
(STAFF COMMENTS)
(2) Will theproject require any work over, in, or adjacent to (within 200 feet) the described waters? If
yes, please describe and attach available plans.
No
(STAFF COM[MENTS)
(3) Estimate the amount of fill and dredge material that would be placed in or removed from surface
water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill
material.
None
(STAFF COMMENTS)
Page 6 of 24
CMTDOCU-NOV-93
MAMIMSM
(4) Will the proposal require surface water withdrawals or diversions? Give general description,
purpose, and approximate quantities if known.
No
(STAFF COMMENTS)
(5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan.
No
(STAFF COMMENTS)
(6) Does the proposal involve any discharges of waste materials to surface Waters? If so, describe th e
type of waste and anticipated volume of discharge.
NO
(STAFF COMMENTS)
b. Ground:
(1) Will ground water be withdrawn, or will water be discharged to ground witer? Give
general description, purpose, and approximate quantities if known.
No
(STAFF COMMENTS)
CHKLTMMI-NOV-93 Pap 7 af24
WASTERWU
f-)
(2) Describe wastematerial that will be discharged.into the ground from septic tanks or
other sources, if any (for- example: Domestic sewage; industrial, containing the
following chemicals .. ; agricultural; etc.). Describe the general size of the system, the
number of such systems, -the number of houses to be served (if applicable), or the
number of animals or humans the system(s) are expected to serve.
NQh C
(STAFF COMMXNTS)
C. Water Runoff (including storm water):
(1) Describe the source of runoff (including storm water) and method of collection and
disposal, if any (include quantities, if known). Where will this water flow? Will this
water flow into other waters? If so, describe.
Oh-5de- 5tDYrn yY2,fer deiemb6h MfAKA-hbll s�sie
(STAFF COMMXNTS)
(2) Could waste materials enter ground or surface waters? If so, generally describe.
(STAFF COMMENT�)
d. Proposed measures to reduce or control surface, ground, and runoff water impacts, if any:
StOYIM defen-Holl 'S�-'�Aem
(STAFF COMMENTS)
Page 9 af 24
CMMTZ=-NOV-"
MASrBR%WEA
4. Plants
a. Check or circie types of vegetation found on, the site:
deciduous tree: alder, aspen, other. A6H
evergreen tree: (9 Eii�e�other.
v� shrubs
grass
pasture
crop or grain
wet soil plants: cattail, buttercup, bulrush, skunk cabbage, other.
water plants: water lily, eelgrass, milfbil, other.
other types of vegetation:
(STAFF COMMENTS)
b. What kind and amount of vegetation will be removed or altered?
SoMe Shru bS -Wee S
(STAFF COMMENTS)
C. List threatened or endangered species known to be on or near the site.
(STAFF COMMENTS)
CHMTZMI-NOV-93 Pap 9 of 24
MASMR%PRA
d. Proposed landscaping, use of native plants, or other materials to preserve or enhance vegetation on the
site, if -any:
(STAFF COMNMNTS)
5. Animals
a. Check or circle any birds and animals which have been observed on or near the site or are known to be on
or near the site:
birds: hawk, heron, eagle,4En=gbirds other:
mammals: deer, bear, elk, beaver, other: 5rN4 tj rodenis
fish: bass, salmon, trout, herring, shellfish, other.
(STAFF COMMENTS)
b. List any threatened or endangered species known to be on or near the site.
None
(STAFF COMMENTS)
C. Is the site part of a migration route? If so, explain.
(STAFF COMNMNTS)
Par 10 of24
CHKLTMMI-NOV-93
MASM%M
d. Proposed measures to preserve or enhance wildlife, if any:
— J�Anp—
(STAFF COMMENTS)
6. Energy and Natural Resources
a. What kinds of energ� (electric, natural gas, oil, wood stove, solar) will be used to meet the completed
project's energy needs? Describe whether it will be used for heating, manufacturing, etc.
(STAFF COMMENTS)
b. Would your project affect the potential. use of solar energy by adjacent properties? If so, generally
describe.
— No
(STAFF COMMXNTS)
C. What kinds of energy conservation features are included in the plans of this proposal? List other proposed
measures to reduce or control energy impacts, if any:
(STAFF COMMENTS)
CMMTJMI-NOV-93 Page 11 of 24
UABMWEA
e-)
I Environmental Health
a. Are there any environmental I health hazards, including exposure to toxic chemicals, risk of,fire and
explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so describe.
NC)
(STAFF COMNIENTS)
(1) Describe special emergency services that might be required.
(STAFF COMMENTS)
(2) Proposed measures to reduce or control environmental health hazards, if any:
-None
b. Noise
(1)
(STAFF COMMENTS)
What types of nois� exist in the area which may affect your project (for example: traffic,
equipment, operation, other)?
-1-VAY-IL
(STAFF COMMENTS)
CMMTDMI-NOV-93 Par 12 of 24
b(ASMWEA
r-)
(2) What types and levels of noise would be created by or associated with the project on a short-term or
a long-term basis (for example: traffic, construction, operation, other)? Indicate what hours noise
would come from the site.
(STAFF COMMENTS)
(3) Proposed measures to reduce or control noise impacts, if any:
(-omtyuctioy) 2,uh�ji-h*e-s wh rne.e;
StAha.Ar86- - . W J
(STAFF COMMENTS)
S. Land and Shoreline Use
a.
What is the current use of the site and adjacent properties?
CuYeenf 11ASe- '. -Piri�aEe- 5chno
'Nov +k Gol� roulrse-
Vves+: kulit - Varni 1��J
(STAFF COMMENTS)
b. Has the site been used for agriculture? If so, describe.
— No
(STAFF COMMENTS)
Page 13 of 24
CflnTD=-N0V-"
WREMSPEA
C. Describe any structures on the site.
. ., A * .
(STAFF COMMENTS)
d. Will any structures be demolished? If so, what?
- \ 'Les, al i hu i ICL Ih
(STAFF COMMENTS)
e. What is the current zoning classification of the site?
— RM I. ;
(STAFF COMMENTS)
f. What is the current comprehensive plan designation of the'site?
Multi - FAmi 1--i
(STAFF COMMENTS)
9. If applicable, what is the current shoreline master plan designation of the site?
(STAFF COMMENTS)
CWMTM=-N0v."
MASMWEA
Par 14 of24
h. Has any part of the site been classified as an "environmentally sensitive" area? If so, specify.
— 1-40+ -Khown
(STAFF COMMENTS)
L Approximately how many people would reside or work in the completed project?
Co c) — -7
(STAFF COMMENTS)
j. Approximately how many people would the completed project displace?
C) — Nto one Yesides oh-s'df
(STAFFCOMMENTS)
k. Proposed measures to avoid or reduce displacement impacts, if any:
I . - . I .
MUMMU&I'MOZZWOU ATM ma. -
(STAFF COMMENTS)
L Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if
any:
-PYU,FCSCI0,MI re,�IeW zhd AP Yoval.
I I S
(STAFF COADIENTS)
CHKLTJD=-NOV-93 Par 15 of24
MASMWEA
9. Housing
a. Approximately how many units would be provided, if any? Indicate whether high,'middle, or low-income
housing�
2A - r die
nid
(STAFF COMN(ENTS)
b. Approximately how many units, if any would be eliminated? Indicate whether high, middle, or low-
income housing.
- 0
(STAFF COMMENTS)
C. Proposed measures to reduce or control housing impacts, if any:
Wone
(STAFF COMMENTS)
.10. Aesthetics
a. What is the tallest height of any proposed structure(s), not including antennas; what is the principle
exterior building material(s) proposed?
'% — r--.4. J. - - I - -, - I - I k
(STAFF COMMXNTS)
Par 16 of 24
CHKLTDWj-NOV-93
MASMR%VEA
A�
b. What views in the immediate vicinity would he altered or obstructed?
mk�oy views s
J
(STAFF COMMENTS)
C. Proposed measures to reduce or control aesthetic impacts, if any:
Ma-hAye trees, will be pirescnmd where- possibLe.
(STAFF COMMENTS)
11. Light and Glare
a. What type "of light or glare "I the proposal produce? What time of day would it mainly occur?
(STAFF COMMENTS)
b. Could light or glare from the finished project be a safety hazard or interfere with views?
— No
(STAFF COMMENTS)
C. What existing off -site sources of light or glare may affect your proposal?
MIkOy IYAL A Ct 7010 MQUOUL
%J
(STAFF COMNMNTS)
CHKLTDWI-NOV-93 Page 17 of24
HASMUMA
d. Proposed measures to reduce or control light and glare impacts, if any:
(STAFF COMMENTS)
12. Recreation
a. What designated and informal recreational opportunities are in the immediate vicinity?
(STAFF COMMENTS)
b. Would the proposed project displace any existing recreation uses? If so, describe.
NO
(STAFF COMMENTS)
C. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be
provided by the project or applicant, if any:
None
(STAFF COMMENTS)
Page 19 of 24
CMLTMWI-NOV-93
AV'-, -,
13. Historic and Cultural Preservation
a. Are there any places or objects fisted on, or. proposed for, national, state, or local preservation registers
known to be on or next to the site? If so, generally describe.
None
(STAFF COMMENTS)
b. Gener i ally describe any landmarks or evidence of historic, archaeological, scientific, or cultural
importance known to be on or next to the site.
(STAFF COMMENTS)
C. Proposed measures to reduce or control impacts, if any:
— None,
(STAFF COMMENTS)
14. Trinsportation
a. Identify public streets and highways serving the site, and describe proposed access to the existing street
system. Show on site plans, if any.
72,1'�* Wii1,N +wo Airovew;)---i .2cce(,� nnn�+c,
(STAFF COMMENTS)
CMUMI-NOV-93 Page 19 of 24
MASTEMSM
b. Is site currently served by public transit? If no, what is the approximate distance to the nearest transit
stop?
Ye s (sipp w'Aih 0
(STAFF COMMENTS)
C. Ho . w many parking spaces would the completed project have? How many would the project eliminate?
GO SP2XeS,
14 Wi POMM "-" VV IN
(STAFF COMMENTS)
d. Will the proposal require any new roads or streets, or improvements to existing roads or streets, not
including driveways? If so, generally describe (indicate whether public or private).
CUVbS qukr w2alks C e2i S+ f-Yn e4e of
%J �—. Sq . I U— J
4-a on)peYf-,I -ah 72-,"')
1 1 J -
(STAFF COMMENTS)
e. Will the project use (or occur in the immediate vicinity of) water, rail, or air transportation? If so,
generally describe.
'No
(STAFF COMMENTS)
CHMTM=I-NOV-93 Pap 20 of 24
MASM&WEA
f.
How many vehicular trips per day would be generated by the completed project? If known, indicate when
peak volumes would occur.
(STAFF COMMENTS)
U:00
g� Proposed measures to reduce or control transportation impacts, if any:
- Nons
(STAFF COMMEENTS)
15. Public Services
a. Would the project result in an increased need for public services (for example: fire protection, police
protection, health care, schools, other)? If so, generally describe.
M�hiM2,1 6PACt
(STAFF COMMENTS)
b. Proposed measures to reduce or control direct impacts on public services, if any:
— '�4one'
. . (STAFF CONMNTS)
Page 21 of 24
CHMMMI-NOV-93-
MAMMU
16. Utilities
a C -
. J�—Hties currently available at the site:
(sanitary !!!Ler) septic system, other.
CA)DU —tv
(STAFF COMMENTS)
b. Describe the utilities that are proposed for the project, the utility. providing the service, and the general
construction activities on the site or in the immediate vicinity which might be needed.
-F-k-cfYiCiL-i -MD "-A ReAuc"e - bqnhwood blspos2l
- GAs - \N hii�ckh NA+Uvz I 6'a-5 01�1,eTV- Chambers
-7elepho-ht GIFE ornevs - C i
(STAFF COMMENTS)
C. SIGNATURE
The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relying on them to
make its decision.
W 'be(ember i'18--js9c,
JI I
Yoeder
Signature of Proponent Date Submitted
Page 22 of 24
CMMTMMI-NOV-93
MASTIRWEA
D. SUPPLEMMNTAL SliEET FOR NONPROJECT ACTIONS
(do not use this sheetfor project actions)
Because these questions are very general, it may be helpful to,read them in conjunction with the list of the elements of the
environment.
When answering these questions, be aware of the extent the proposal, or the types of activities likely to result from the
proposal, would affect the item at a greater intensity or at a faster rate than if the proposal were not implemented. Respond
briefly and in general terms.
1. How would the proposal be likely to increase discharge to water; emissions to air, production, storage, or release of
toxic or hazardous substances; or production of noise?
Proposal measures to avoid or reduce such increases are:
2. How would the proposal be likely to affect plants, animals, fish, or marine life?
Proposed measures to protect or conserve plants, animals, fish, or marine life are:
3. How would the proposal be likely to deplete energy or natural resources?
Proposed measures to protect or conserve energy and natural msources are:
Par 23 of24
CMMTM=-NOV-"
UAffMRXRVRA
4. How would the proposal be likely to use or affect environmentally sensitive areas or areas designated (or eligible or
under study) for governmental protection; such as parks, wilderness, wild and scenic rivers, threatened or endangered
species habitat, historic or cultural sites, wetlands, floodpWns, or prime farmlands?
Proposed measures to protect such resources or to avoid or reduce impacts are:
How would the proposal be likely to affect land and shoreline use', including whether it would allow or encourage land
or shoreline uses incompatible with existing plans?
Proposed measures to avoid or reduce shoreline and land use impacts are:
6. How would the proposal be likely to increase demands on transportation or public services and utilities?
Proposed measures to reduce or respond to such demand(s) are:
7. Identify, if possible, whether the proposal may conflict with local, state, or federal laws or requirements for the
protection of the environment.
Pap 24 of 24
CHKLTDMI-NOV-93
MASFERWU
0006.
WSS/tcp/klt
11/30/90
ORDINANCE NO. 2824
AN ORDINANCE OF THE CITY OF EDMONDS, WASHINGTONI
AMENDING THE ENVIRONME14TALLY SENSITIVE AREAS MAP
AND EDMONDS POLICY PLAN TO INCLUDE THE COLLEGE
PLACE TRAFFIC AREA AND FIXING A TIME WHEN SUCH
ACTION SHALL BE EFFECTIVE.
WHEREAS, the City has designated through the Edmonds
Policy Plan certain environmentally sensitive areas which are not
subject to the exemptions established by WAC 197-11r800 and ECDC
20.15A.100;
WHEREAS, the Council finds that the traffic wi thin the
College Place area h as reached a critical level and has
previously commissioned a study know as the Bell Walker Report in.*
order to determine the offsite impacts of development and
appropriately assess mitigation fees;
WHEREAS, the implementation of mitigation fees are
restricted by the categorical exemption relating to the
construction of building projects with four or fewer units; and
WHEREAS, the Council finds that the College Place
neighborhood, given the impacts of any additional impact traffic,
on the already critical traffic situation, should be designated
as an environmentally sensitive area in order that all new
construction be reviewed to determine whether impact fees are
appropriate, NOW, THEREFORE,.
THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, DO
ORDAIN AS FOLLOWS:
WSS528720
-1-
Section 1. The Edmonds Policy Plan, the,
Environmentally Sensitive Areas Map is hereby amended to include
the College Place traffic area shown on the Attached Exhibit A,
incorporated by this reference as fully as if herein set forth.
Section 2. This ordinance, being an exercise of a
power specifically delegated to the City legislative body, is not
subject -to referendum, and shall take effect five (5) day s after
passage and publication of the ordinance or a summary thereof.,
consisting of the title.
APPROVED:
MA71.,AR� AUGHtEN
ATTEST/APTHENTICATED:
R
E-TY ftERK, JACQUELINE G. ARRETT
APPROVED AS TO FORM:
OFFICE OF THE CITY ATTORNEY:
BY
FILED WITH THE CITY CLERK: N6vember 30, 1990
PASSED BY THE CITY COUNCIL: 26, 19911�
PUBLISHED: March 1, 1991
EFFECTIVE DATE: March 8,' 1991
ORDINANCE NO. 2824
WSS528720
-2-
I
DEVELOPER MITIGATION
General
The use of developer funded traffic impact mitigation measures has become a necessary
component of transportation planning activities in recent years. The City f Edmonds
has. approached the point of development that will require developers to proviode traf f ic
impact mitigation in order -to maintain acceptable traffic operations on the city street
system. Three Possible mitigation scenarios are discussed in this report as Possible
Policy for the City of Edmonds to adopt in the interest of pre s erving and providing
an efficient, safe and affordable transportation system.
Transportation Impact Fees
The process of "charging" developers for the impacts their projects have on the
transportation system has become an increasing viable method of allocating improvement
costs fairly over a wide area. Impact fees are commonly assessed based on peak -hour
trip generation of the development and are used to fund immediate 'ol� future projects
required to mitigate the developer's impacts to the adjacent str et system. s
-time traffic impact fee of $*2,010
Angeles County, California has established a one i Lo
per peak hour trip generated for new developments. The fee is deposited into -a
transportation trust fund and is used area -wide to provide improvements as needed.
Montgomery County, Maryland requires a similar fee, but requires annual payments to
cover 20-year construction bonds for required projects. Again, the fee is based on
peak hour trip generation. Dallas, Texas uses a flat rate fee of $0.50 per square
fOOt'of development. While simpler to establish than fees based on trip generation,
it is not as equitable due to the wide ra ge of trip generation C*harac' teris tics
attributable to a given square foot of devellolpment.
The " cost per trip" factor calculated for use in the project 'prioritization section
Of this report could also be used to establish a cost per peak hour trip impact fee
for the College Plac-e Traffic Study study area. The type of improvements to the street
system can be divided into those that primarily serve the immediate area (local
streets) and those that are improvements to the arterial streets and serve the
entire area. The costs for local streets would be totally the responsibility of
the study area. The arterial street improvement costs would be shared bas'ed' on the
contributed traffic volume.. The fee is determined as follows:
Arterial
Local Streets
Streets
Total
Cost of Improvements*
Total Additional P.M. Peak
$1,149,000
Trips .1 — 1,745
$199,000
-- 1,745
$1,348,625
1,745
Impact Fee Per Added . P.M. Peak Trip $ 658
$ 114
$ 772
* Share of cost det-ermined
traffic to total traffic.
by Jurisdictional and the
Refer to Figures 6-10, -and
ratio of .
Table 7.
site generated
-28-
TA �0
�- .,h .� . I �' W "
Vm
OIT
W.
-hn. :P,�
ADB'— &i SO,
tM
'ZfA�, V1,
V
RM- F.5
541i.
V i")
LU
T�Au
�7.
z
04
212TH ST sw,--
Vicinity and Zoning Map
qm
Exhibit 1
File# AP-96-150
0006.
WSS/tcp/klt
11/30/90 2824
ORDINANCE NO.
AN ORDINANCE OF THE CITY OF EDMONDS, WASHINGTON,
AMENDING THE ENVIRONMENTALLY SENSITIVE AREAS MAP
AND EDMONDS POLICY PLAN TO INCLUDE THE COLLEGE
PLACE TRAFFIC AREA AND FIXING A TIME WHEN SUCH
ACTION SHALL BE EFFECTIVE.
WHEREAS, the City has designated through the Edmonds
Policy Plan certain environmentally sensitive areas which are not
subject to the exemptions established by WAC 197-11-800 and ECDC
20.15A.100;
WHEREAS, the Council finds that the traffic within the
College Place area h as reached a critical level and has
previously commissioned a study know as the Bell Walker Report in.
order to determi ne the offsite impacts of development and
appropriately assess mitigation fees;
WHEREAS, the implementation of mitigation fees are
restricted by the categorical exemption relating to the
construction of building projects with four or fewer units; and
WHEREAS, the Council finds that the College Place
neighborhood, given the impacts of any additional impact traffic
on the already critical traffic situation, should be designated
as an environmentally sensitive area in order that all new
construction be reviewed to determine whether impact fees are
appropriate, NOW, THEREFORE,.
THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, DO
ORDAIN AS FOLLOWS:
WSS528720 -1-
Section 1 The Edmonds Policy Plan, the
Environmentally Sensitive Areas Map is hereby amended to include
the College Place traf f ic area shown on the Attached Exhibit A,
incorporated by this reference as fully as if herein set.forth.
Section 2. This ordinance, being an exercise of a
power specifically delegated to the City legislative body, is not
subject to referendum, and shall take effect five (5) days after
passage and publication of the ordinance or a summary thereof
consisting of the title.
APPROVED:
ATTEST/AUTHENTICATED:
tfTY ftERK, JACQUELINE G. PARRETf—
APPROVED AS TO FORM:
OFFICE OF THE CITY ATTORNEY:
I'-V4
FILED WITH THE CITY CLERK: N6vember 30, 1990
PASSED BY THE CITY COUNCIL: -rebruary..26, 1991*-.-'�'
PUBLISHED: March.1, 1991
EFFECTIVE DATE: March 3, 1991
ORDINANCE NO. 2824
WSS528720 -2-
DEVELOPER MITIGAZION
General
The use of developer funded traffic impact mitigation me . asures has become a necessary
component of transportation planning activities in recent years. The City of Edmonds
has. approached the point of development that will require developers to provide traffic
impact mitigation in order to maintain acceptable traffic operations on the city street
system. Three Possible mitigation scenarios are discussed in this report as Possible
Policy for the City of Edmonds to adopt in the interest of preserving and providing
an efficient, safe and affordable transportation system.
Transportation Impact Fees
The process of "charging" developers for the impacts their projects have on the
transportation system has become an increasing viable method of allocating improvement
costs fairly over a wide area. Impact fees are commonly assessed based on peak -hour
trip generation of the development and are used to fund immediate or future projects
required to mitigate the developer's impacts to the adjacent street system. Los
Angeles County,. California has -established a one-time traffic impact fee 0 f $2 " 0 1 0
per peak hour trip generated for new developments. The f ee is de pos ited into a
transportation trust fund and is used area -wide to Provide improvements as needed.
Montgomery County, Maryland requires a similar fee, but requires annual Payments to
cover 20-year construction bonds for required projects. Again the fee is based on
peak hour trip generation. Dallas, Texas uses a flat rate fee' Of $0*50 per square
fOot'Of development. While simpler to establish than fees based on trip generation,
it is not as equitable due to the wide range of trip generation c*haracteristics
attributable to a given square foot of development.
The 11cost per trip" factor calculated for use in the project prioritization section
of this report could also be used to establish a cost per peak hour trip impact fee
for the College Place Traffic Study study area. The type of improvements to the street
system can be divided into those that Primarily serve the immediate area (local
streets) and those that are improvements to the arterial streets and serve the
entire area. The costs for local streets would be totally the responsibility of
the Study area. The arterial street improvement Costs would be shared based on the
contributed traffic volume. The fee is determined as follows:
Arterial
Local Streets
Streets
Total
Cost of Improvements*
Total Additional P.M. Peak
$1,149,000
Trips 11745
$1990000
--- 1, 45
$1, 348,625
1 745
Impact Fee Per Added P.M. Peak Trip _ $ 658
$ 114
$ 772
Share of cost determined
traffic to total traffic.
by Jurisdictional and the
Refer to Figures 6-10, -and
ratio
Table 70.f
site generated
-28-
0 1 0
LETTER OF TRANSMITTAL
Washington Land Design
9709 Third Avenue N.E., Suite 203, Seattle, Washington 98115-2027
(206) 522-9510 FAX: (206) 522-8344 E-Mail: wld@wldengr.com
Date: September 11,11-998
To: Gordy Hyde, City of Edmonds
From: Joe Geivett
Re; Edmonds Condominiums, 208' Street S. W. and 72 "d Avenue West
Remarks
Enclosed please find one copy of sheets C-1, C-3, and C-6 for the above referenced
project. We have marked these plans to i I I ustrate revisions to the storm system necessary
due to revised field conditions. There are numerous utilities in 72"d Avenue West which
requires modification to the original storm drainage design. Please review and call if you
have questions. Our surveyor will continue to proceed on the construction of these
improvements.
cc: Ronnie Hilliard, Western Surveyors
edpsghol
JJSCFJ'VF'0
su A 4 jq�B
e,4Gtt4FFsiNG
CITY CLERK
CITY OF EDMONDS
121 STH AVENUE NO.
Eai')NDS, WA 98020
STREET RLE
9BO2040112
02/04/98 10:26
p.0004 Recorded
Snohomish County
NOTIFICATION OF LOT AGGREGATION
TO COMBINE LOTS AS DESCRIBED IN THIS RECORDING
PROPERTY OWNER
(grantor/grantee): Double Eagle Development L.L.C.
Legal Description: Section 20, Township 27, Range
(for more detailed legal description see Exhibit B)
Tax Account Numbers: 3801-000-005-0000
3801-000-006-0108
�801-000-006-0207
The purpose of this document is to combine the aforementioned lots per the agreement
identified and signed by the property owner. in Exhibit A of this recording
is the person who appeared before me, and said person acknowledged that (he / she)
signed this instrument and acknowledged it to be (his / her) free and voluntary act for the
uses and purposes mentioned in the instrument.
Dated: a 2 y-
(print or type name)
NOTARY PUBLIC in and for the
State of Washington, residing at:
71az?- 919 P/ 104 /0 "-',4
?go'a 10
My commission expires: 1-ch s
'/-.2,54 el
EXHIBIT B
THE LAND REFERRED TO HEREIN IS SITUATED IN THE STATE OF
WASHINGTON, COUNTY OF SNOHOMISH AND IS DESCRIBED AS FOLLOWS:
PARCEL A:
Tract 5, Plat of Aurora Heights, according to the plat thereof recorded in Volume 12 of
Plats, page 120, records of Snohomish County, Washington.
PARCEL B:
That portion of Tract 64 Aurora Heights, according to the plat thereof recorded in Volume
12 of Plats, page 120, records of Snohomish County, Washington, described as follows:
Commencing at the Northeast comer of said Tract 6;
thence South along the Easterly line of said Tract 6, a distance of 132 feet;
thence West and parallel to the North line of said Tract 6 to the West boundary line of
Tract 6;
thence Northerly along the West line of said Tract 6, a distance of 132 feet.to the Northwest
comer of said Tract 6;
thence East along the North line to the POINT OF BEGINNING.
EXCEPT portion deeded to City of Edmonds by deed recorded under Auditor's File No.
8911170207.
PARCEL C:
Tract 6, Aurora Heights, according to the plat thereof recorded in Volume 12 of Plats, page
120, records of Snohomish County, Washington;
EXCEPT the North 212 feet thereof.
Situate in the County of Snohomish, State of Washington.
FX4131T A
NOTIFICATION OF LOT AGGREGATION
WHEREAS, the undersigned owns three (3) lots, legally described in Exhibits A and B
attached hereto and incorporated by this reference as if set forth in full; and,
WHEREAS, the owner of said parcels is applying for development approvals for the
construction of a residential condominium on the lots described in Exhibits A and B; and,
WHEREAS, the owner desires to aggregate said parcels into one building lot in order to
have its condominium development application processed as one development;
NOW, THEREFORE, the undersigned property owner, as the owner of the parcels
described in Exhibitoo and B, does hereby aggregate said parcels into a single building
parcel. This notification is being recorded in order to confirm the aggregation so that the
three (3) parcels shall be considered as one for the purpose of development review by the
City of Edmonds. The City will apply setbacks to the newly aggregated lot in accordance
with current ordinance. By this notification, the owner binds itself, its successors, heirs
and assigns to treat the parcels legally described in Exhibits A and B in accordance with
the pr ovisions of law and ordinance prior to any future sale of less than the entire newly
aggregated parcel.
DONE this day of 1997.
ACKNig
YEDGED:
............
DOUBLE��kbLE DEVELOPMENTS L.L.C.
by RobiffMiller, Manager
STATE OF WASHINGTON )
) ss.
COUNTY OF SNOHOMISH)
I certify that I know or have satisfactory evidence that RfBw L.
9802040"112
STREET FILE
RETURN ADDRESS:
City of Edmonds, City Clerk
121 5th Avenue North
Edmonds, WA 98020
03/11/98 16:27
P-0003 Recorded
Snohomish County
DECLARATION OF RESTRICTIVE COVENANT
MULTI-FAMIELY RESIDENTIAL
Reference#: 97-275
Grantor(s):(I)Double Eagle Develp.ments LLQ Additional on pg.
Grantee(s): City of Edmonds
Legal Description (abbreviated): See-1 _0Twn__Z ng
_F _�Qtr
OR Lot Block Plat
Assessor's Tax Parcel ID#(s): (1 (2)
-----Assessor's Tax Parcel ID# not yet assigned
WBEREAS, Grantor is
Aii the owneri of the following described real estate in the City of Edmonds, to wit:
Property Address: 7218 208th St SW & 20808-2()824 72nd Asie W, Edmonds WA.
Legal Description: SEE.EXHIBIT "A", Attached
Assessor's Tax Parcel.1D # (s): 3801 000 005 00, 3801 000 006 01
AUTHORIZED FOR RECORDING
City of Edmonds
By: —Date. z-11 I./g. T
Page of J
I :' ?,O�
WBEREAS, the above named owners are desirous of imposing a restrictive
covenant upon said premises in compliance with Section 19-00.040 of the Edmonds
Community Development Code. WITNESSETH, that for and in
consideration of the premises, the above named owners do hereby declare and grant to
the City of Edmonds as Grantee the following restrictive covenant, to -wit: .
That at the time of the execution of this Covenant the Grantors have agreed to the
Ordinance of the City of Edmonds provide that no building for multiple family housing
may be erected on subject property containing more than u . nits.
Said Covenant sliall be binding upon all present and future owners of said real estate and
their heirs, successors and assigns.
AT'�l iis ay of 'Wo'c", 19
GRANTOR
GRANTOR
State of Washinoton
)ss
County of'*pt+Vt-41_s!tt_)
I certify that I know or have satisfactory evidence that fi)31j,/ L_ - Al / L-4,
signed this instrument, on oath stated that he/she was authorized to execute the
instrument and acknowledged it as the (title) of
—(name of party on behalf on whom instrument was executed) to be
the free and voluntary act of such party for the uses. and purposes mentions in this
instrument. Subscribed and sworn to before me this - ID r
day of A2,0
19
*A WJ
AtVry iublic in ahhor the State of Washington.
W#
pires 1 -7
My commission ex
0 Lit, .-' -k- z
AUTHORIZED FOR RECORDING
City of Edmonds
B Y: _Date_ZtLt�q�
Page 2- Of -3
L:\tEMP\BUILDING\FORrVIS\RESTRICT
9803110568
EXHIBIT A
THE LAND REFERRED * TO HEREIN IS SITUATED IN THE STATE OF
WASHINGTON, COUNTY OF SNOHOMISH AND IS DESCRIBED AS FOLLOWS:
PARCEL A:
Tract 5, Plat of Aurora Heights, according to the plat thereof recorded in Volume 12 of
Plats, page 120, records of Snohomish -County, Washiftgton.
PARCEL B:
That portion of Tract 6, Aurora Heights, according to the. plat thereof recorded in Volume
12 of Plats, page 120, records of Snohomish County, Washington, described as follows:
Commencing at the Northeast comer of said Tract 6;
thence South along the Easterly line of said Tract 6, a distance of 1�2 feet;
thence West and parallel to the North line of said Tract 6 to the West boundary . line of
Tract 6;
thence Northerly along -the West line of said Tract 6, a distance of 132 feet to the Northwest
comer of said Tract 6;
thence East along the North line to the POINT OF BEGINNING.
EXCEPT portion deeded to City of Edmonds by deed recorded under Auditor's File No.
8911170207.
PARCEL C:
Tract 6, Aurora Heights, according to the plat thereof recorded in Volume 12 of Plats, page
120, records of'Snohomish County, Washington;
EXCEPT the North 212 feet thereof.
(z '5 v I C15
e &V
Situate in the County of Snohomish, State of Washington.
980311()568
4�1,/
DOUBLE EAGLE DEVELOPMMS LLC
146 Third Avenue South - Edmonds - Washington 98020
(206) 583 0238 - (206) 775 3822 - Fax (206) 583 0306
February 6, 1998
Mr. Jim Walker 891FREENsIm FILE
Engineering Dept, City of Edmonds
121 5" Ave. N., 2 nd Floor
Edmonds, Washington 98020
Re: Traffic Mitigation Fees; Turnberry Lane Condominium
Dear Mr. Walker,
RECEIVED
FEB 0 6
COMMUlyffy 6ERVICL.4
Our development company has concluded that the cost of completing tie off -site
storm water and other improvements along 72 n' Ave. West, in accordance with the
approved civil engineering for the project, will substantially exceed the amount of the
mitigation fees indicated in correspondence from your department which are normally
collected at the time permits are issued.
Given the foregoing, -we request that the collection of those mitigation fees be
eliminated -from the final amounts payable to the City when permit fees are calculated,
since we will require the use. of:those funds, and more, to complete the neeessary off -site
improvements. - We understand that bonding or other suitable completion guarantees will
be required of us prior to the issuance of any permits.
If you have questions or concerns regarding our request, please contact me or
Peter Schroeder at 206.223.0393 as soon as possible. We look forward to beginning
work on the project within a few days. Thank you for your continued assistance.
Respectfully,
Bo Klepinger, LLC ember
c:
Ann Bullis, John Bissell Gordy Hyde
Ce
, _�r-e e* C( t? O�
of M 0 a �� e_ t t4 ct
6 �71179>
0 0
drc(,')?,7J e
_�_o 0 1— j *r e
+ tm rt-&i ette n e e i's
M ccep
P ItJ �T Q
Tee-
1 0
DOUBLE EAGLE DEVELOPMENTS LLC
146 Third Avenue South - Edmonds - Washington 98020
(206) 583 0238 - (206) 775 3822 - Fax (206) 5a3 0306
February 6, 1998
Mr. Jim Walker
Engineering Dept, City of Edmonds
121 5 1h Ave. N., 2 nd Floor
Edmonds, Washington 98020
Re: Traffic Mitigation Fees; Turnberry Lane Condominium
Dear Mr. Walker,
RECEIVED
FEB 0 6
COMMUN I Y 6ERVICL!J:
Our development company has concluded that the cost of completing the off -site
storm water and other improvements along 72 nd Ave. West, in accordance with the
approved civil engineering for the project, will substantially exceed the amount of the
mitigation fees indicated in correspondence from your department which are normally
collected at the time permits are issued.
Giventhe foregoing, we request that the collection of those mitigation fees be
eliminated -from the final. amounts payable to the City when permit fees are calculated,
since we will require the use. of:those funds, and more, to complete the necessary off -site
improvements. - We understand that bonding or other suitable completion guarantees will
be required of us prior to the issuance of any permits.
If you have questions or concerns regarding our request, please contact me or
Peter Schroeder at 206.223.0393 as soon as possible. We look forward to beginning
work on the project within a few days. Thank you for your continued assistance.
Respectfully,
Bo Klepingier,LLC ember
c:
Ann Bullis, John Bissell Gordy Hyde
Run Date: 02/05/98
R.
Miller Construction Co., Inc.
Page:
I
J/C Date; 02/05/98
JOB ESTIMATE PRINTING ITEM COST G PRICE
SUMMARY
Time:
Oe:43 AM
ESTIMATE NO: 4636-555 TURNBERRY TOWNHOUSES REVISED'
-------------------------------------------------------
--------------------------------------------------
ESTIMATOR: JERRY COX
JOB ADDRESS:
S.F.:
13,238
JOB TYPE: GEN General Contract
START
DATE:
EST.STATUS: N NEW
COMMENT:
COMPL DATE:
STATUS DATE: 02/04/98
CONTACT:
PHONE:
-
EXT:
+---TAKE OFF---+
EXTENDED
EXTENDED
LINE ITEM CODE
DESCRIPTION
U/M QUANTITY UNIT CO�T
COST MARKUP
PRICE
1
Demolition a Abatement
13320.000
13,320.00 .00
13,320.00
2
Mitigation Fees - Edmonds
1.000 7484.100
------------
7,484.18 .00
7,484.18
3 *SUB
------------
20,804.18 .00
------------
20,804.16
4
5
SITEWORK - OFF SITE:
6
Site Utilities & Earthwork
1.000 47625.000
47,625.00 .00
A0 47,625.00
5/ -AABC)
7
Sidewalk & Formed Curbs
1.000 6818.000
6,816.00 .00
A 6,818.00
00
8
Asphalt Paving - off site
1.000 4300.000
4,300.00 .00
0 4,300.00
'5100
9
G.C.,Insurance, B&O 6 Overhead
1.000 0.000
.00 8,693.96
8,693.96
10 -SUB
TOTAL SITEWORK - OFF SITE
------------
------------
58,743.00 8,693.96
------------
67,436.96
11
12
SITEWORK - ON SITE:
13
Surveyor
1.000 900.000
900.00 .00
900.00
14
Site Utilities & Earthwozk
1.000 99168.400
99,168.40 .00
J( 99,168.40
is
Sidewalk 6 Formed Curbs
1.000 10500.000
10,500.00 .00
* 10,500.00
1 z4-51>
16
Asphalt Paving - on site
1.000 18995.000
18,995.00, .00
A Is, 995. 00
2 2
17
Striping
1.000 600.000
800.00 .00
4; 800 .00
is
Extruded Curbs
920.000 1.750
1,616.00 -00
* 1,610.00
0
19
Landscaping
1.000 59600.000
59,600.00 .00
59,600.00
20.
Fences
290.000 14.700
4,263.00 .00
4,263.00
21
Dumpater Enclosers
2.000 735.000
1,470.00 .00
1,410.0b
22
G..c.,Insurance, 840 9 Overhead
1.000 0.000
.00 29,201.35
29,201.35
23 *SU13
TOTAL'SITEWOPK - ON SITE
------------ ------------ ------------
197,306.40 29,201.35
226,507.75
24
so 01
4 225000
q qb
"0 .40
DOUBLE FAGLI DEVELOPMEMS LLC
146 Third Avenue South - Edmonds - Washington 98020
0
(206) 583 0238 - (206) 775 3822 - Fax (206) 583 OW6
February 6, 1998
Mr. Jim Walker
Engineering Dept, City of Edmonds
121 5hAve. N., 2 d Floor
Edmonds, Washington 98020
Re: Traffic Nfitigation Fees; Tumberry Lane Condominium
Dear Mr. Walker,
RECEIVED
FEB 0 6 1998
COMMUNITY SERVICES -
Our development company has concluded that the cost of completing the off -site'
storm water and other improvements along 72 d Ave. West, in accordance with the
approved civil engineering for the project, will substantially exceed the amount of the
mitigation fees indicated in correspondence from your department which are normally
collected at the -time permits are issued.
Given the foregoing, we request.that.the collection of those mitigation fees be
eliminated -from the final, amounts payable to the City when permit fees are calculated,
since we will require the use of those funds, and more, to. -complete the necessary off -site
improvements. - We understand that bonding or other suitable completion guarantees will
be required of us prior to the issuance of any permits.
If you have questions or concerns regarding our request, please contact me or
Peter Schroeder at 206.223.0393 as soon as possible. We look forward to beginning
work on the project within a few days. Thank you for your continued assistance.
Respectfully,
Bo Klepinger, LLC ember
c:
Ann Bullis, John Bissell Gordy Hyde
LETTER OF TRANSMITTAL
Washington Land Design
10700 Meridian Ave. No., Suite 503
Seattle, WA 98133
(206)365-9510 FAX(206)365-0225 E-Mail. wld@widengr.com
Date: November 13, - 1997
To: Patrick Pirtle DRUM
From: Bi 1 11 Fortunato NOV 17 11997
Re: Turnberry Condominiums; Edmonds, W�shington
Remarks
Please find the enclosed Grading calculations for the above referenced project. The enclosed
site plan shows the cut and fill locations for the site. The Site Volume Table indicates the
amount of cut and fill using separate methods. For the purposes of the City of Edmonds, the
grading can be summarized as follows:
EMMME q
900 CY
1*..-.-*'* 3375-
* This calculation is a rough estimate based on the survey and the proposed grades. The totals in no way reflect
over -excavation for structural fill or of unsuitable soils.
Also as we discussed in our telephone conversation, we foresee no need for temporary
shoring. Bu ilding 'A' would be the only building of concern if an extreme amount of over -
excavation is needed for the building foundation. The Geotechnical Engineering Report from.
Nelson-Couvrette & Associates does not -indicate soils which would require such excavation.
'If you have any questions regarding th'is transmittal, please contact me at 365-9510.
FILE
W!�.
7ai
site Volume Table: unadjusted
Cut
Fill Net
yards
yards yards
Method
Site:' edps
Stratum: earth
ex prop
498 860
362 (F)
Grid
494 751
256 (F)
Tin' Sub
514 894
38b (F).End
area
WoshIneyton I-andDesIgn
NOV 1 3 W7
V
, 21
N A
7 cizilve
Q,
�3 '�"Fy
!996
ego-191-
CqUNTER
tv
4
Cii of Edmonds.-.
Critical Ar"as"
e
'ne Critical AreajChj�� -�6 `0
ned on d b
this farm, is to be filled out by any person 211. su mit it to the City. Ile City will
review the Checklist. make a.precursory site
preparing a Development Permit and Mal�6'a' dei��fiinati6n.Of th,& -- "
Application for the City Of Edmondsprior subsequent steps 'necessary to complete a
to his/her submittal of a development development permit application -
Permit to the City.
�With a signed copy of this,form, the
Ile purpose of the Checklist is to e�le 2PPlicant should also submit a vicinity map
City staff todeterrninewhethe�any_. or or i of. the parcel
plot P;an f ndividual lots
Potential Critical Areas are ormay be with enough detail that City staff can find
present on the subject propert ijb.
.y.- - 'Me 3M identify V6 s" " je'd pd�. 'in
information needed to complete the additioi, the 2pplicant ifiall include
Checklist should be easily available fr�
m other palkiient inf,67r��fion (e.g. site
,Observations of the site ordata, available'�t pit� Ummilt:1111U. imap, etc.) orstudies in
City Hall (Critical Areas inventories, maps.' comaunction with this Checklist- to a�sist
or soil surveys). -staff in . completing their preliminary
s - ` - � 1 ., 11 :
2ssessment or the" ite.
Anapplicant, Or his/her rep'resentathie,i
must fill out the Checklist, -sign and -date it,
I have completed the attached Critic a-1 Area Checklist and attest that the answers provided are
factual, to the best of my knowledge (fill out the appropr* column bclow).
Owner I Applicant: Applicant Representative:
L L6 PJ57� -
Name N=ne
IWO 3)IPxVPWvF_ .50UM /4764 7NRZ) AVENUt-E 091006
Street Address Street Address
WA -qgo2o _44FAV4=5� WA INV (20(p) 22Z '02f_3
City, State, zip. (2*) 5ft VISAPhone at-y, State, zip
Phone..,%.,
ure
—Date igmiure
f,gnature
/Datw,,�.,,�
Site Infbern -Odsltopog2i .0
P!l ..
ro
Si t A . ddressAl ion R UIT
P&jefty Tax Accoutir Nul"ni
-2 `07
jAporbxirnate Site.Size
or s feet): 60,000
quare
p.
4� Is. this -.Site currently developed? no.
—m—yes
If yes; how is site developed?
tit,
5. Describe the general site eck al dm*a
j
0
to Flat: Ims th n e over en
ess than.5
/0_ Ro I I ing: sl op es on s ite g eneraUy less than 15 % (a verti cal ris I* o f I 0-feet,,over. a - ri
. . 1"�� _�. - :1 � �
h nzo
o � 'dtal distanc� of �&feet).
iite of More than 15*% an-d'Iess.tha'n 3 amerticai rise
Hiliy. ""slopes Preserit on, 0
of I G-feet over a horizontal distanceof 33 to 66-feet).
Steep: grades of greater than 30% present on site (a vertical rise of I 0-feet' over 'a''
horizontal distance of less than 33-feet).
Other (please describe):
6. Site contains areas of year- rdurid -standing, , wat . er ao
Approx,.- Depth:
7. Site co�tains areas of.seasonal standing water ao Approx.- Depth:
What seasop(s).of the year?
of a
Site is in the floodway WO floodplain water course.'
9. Site contains a creek or an'area where water flo7rross the grounds surface? Flows are year-
round? ws are season— tq (What time of year?
Flo
10. Site is primarily: forested 5�&M& meadow ;shrubs mjxed
urban landsca2ed (lawn,shrubs etc)
11. Obvious wetland is present on site: AIV
For City Staff Use On v
I - Site is Zoned?
2. -kS tnapped soil type(s).) Ur.&wv 4-ItIvi -5 la,41e
3- Weiland inventory or CA. rnap indicates wetland present on site?
---,Critical Ams inventory or C.A. xnap indicates Critical Area oz� site?.
withi' designated iarth*subsidence landslide 6=rd aiii?
.'�ite n
6- -S�itd d ated on the Environmentally Sensitive Areas M203 410
esign
DETERMINATON
'"STUDY REOUIRED
CONDITIONAL WAIVER
-WAIVER'
Revi�wed by-
Pl� -,�Date'l %
)—rot--
X,
Rcv01AW" ti'mcl-
4
k
A
I", . '
777777- 7-
INTER-OFFICE COMMUNICATIONS
DATF MAY, 19 �-2
TO FROM PLANNING DEPARTMENT
TOR!
NJ PLAN/ENG INSPECTOR
ASR<=
S UBJECT: ADB-21--82/THE :STE lNSCHOOL/HEAR I W_DATE':.JUNE'-2,; - -1982
PLEASE SUBMIT YOUR COMMENTS ON THE ATTACHED PROPOSAL BEFORE
THE HEARING DATE,
THANK YOU.
bh=- t "T F L
DATE FILE
SITE PLAN.
CITY OF EDMONDS
APPLICATION
to the
ARCHITECTURAL DESIGN BOARD
BUILDING PLANS (3): ELEVATIONS V1
LANDSCAPE PLAN t-/
ENVIRONMENTAL DAT-A RECEIPT #
SIGN EXHIBITS LI-1, FEE RECPT #
PLAN MODIFICATIONS TO FILE NUMBER:
HEARING DATE _TQpS _Z 1, lq�3
OWNER /REPRESENTATIVE jMWV -
IJ =,/ ) PHONE &
,k
ADDRESS 07, /_ &ff
-ZIP CODE
ARCHITECT/DESIGNER
PHONE
PROPERTY ADDRESS72/tf'- 21 -e Jd� S ZONING
LEGAL DESCRIPTION 7/./,C PZPr 6FAV&pt?4 Jill,4,67-5.0 T
C 4 C_,
r-1416- 5-,a, e_,� c- 44Z�Z_�Q 6 /v .5 "T's-ro'--y 'dweli
40.4A-rdn /'V <A'C1*1r'AJ J'6 .274/ RzfV,!��F_ 4;1,eT 0i A4 5/rZVMA (A, 'Ma4-.C6. IM77,4' diC tUk -
PLANS SUBMITTED FOR APPROVAL:
Building Plans - Preliminary-
-I'.
Site Plan
2. Sign Elevations --' Site Plan_
3. Modification of previous approval
Final
Landscape Plan Elevations 4"�
Landscape Plan
EXISTING USE OF PROPERTY
?J9AJ
DESCRIPTION OF PROPOSAL
APPROXIMATE DATE WORK WILL BEGIN ON PROJECT '1�
ESTIMATED TIME FOR COMPLETION OF WORK d -
RELEASEMOLD HARMLESS AGREEMENT: The undersigned applicant, his heirs and assigns, in
consideration for the City processing the application agrees to release, indemnify, defend and
hold the City of Edmonds harmless from any and all damages and/or claims for damages,
including reasonable attorneys; fees, arising from any action or inaction of the City whenever
such action or inaction is based in whole or in part upon false, misleading or incomplete
information furnished by the applicant, his agents or employees.
PERMISSION TO ENTER SUBJECT PROPERTY: The undersigned applicant grants his, her or its per-
mission for public officials and the staff of the City of Edmonds to enter the subject
property for the purpose of inspection and posting attendant to this application.
A0 -Z
(SignatTf _Ypplicant)
The Stein School
Pre -School e Kindergarten
7218 - 208th S.W. 0 Edmonds, Washington 98020 * 778-8572
Mr. James E. Adams, P.E.
City Engineer
City of Edmonds
200 Dayton Street
Edmonds, Washington 98020
Dear Mr. Adams:
SUBJECT: 208th Street S.W.
December 20, 1982
STRL'-"'' I FILE
7
Enclosed is the information you requestedi-kn regards
to marking 208th Street S.W. a school zone.
1. Total enrollment 180 students
2. Days of operation Monday through Friday
3. Hours of operation - 8:30 am - 3:30 pm
4. Number of students walking - 15 with parental supervision
5. Remainder of students use private transportation
6. School safety policy - Parents received letter at beginning
of school year urging caution upon entering and leaving the
parking lot. Also, students are not allowed to leave the
school without parental supervision.
Sincerely,
A- Stein
D'rector
May 27, 1982
MEMO TO: Architectural Design Board
FROM: Dan Smith
Planning/Engineering''.
Inspector* --
SUBJECT: JUNE 2, 1982-ADB MEETING i
ADB-19-82 'BICKFORD STEAKS
No comment.'
ADB-25-82' CROSS ENTERPRISES,INC.
No comment.
ADB-20-82 COMMERCIAL DESIGN ASSOCIATES
The requirements ar e as follows:
a) Extend curb, gutter, sidewalk and pavement to east
property line of Pine Street.
b) Obtain approved utility development plan from
Engineering prior to issuance of the building permit.
c). Obtain the proper permits in conjunction with the
development of the property.
ADB-21-82 STE.IN SCHOOL
Due to the unsafe�n*ature of the access from the school
parking lot onto 208th, only one curb cut will be
allowed. This -should be at the far west side.of the
property. The'gravel* parking lot is approved, however,
20' of asphalt paving.back from the edge of the 208th
Street shall be required. The owner is also required.to
sign a "waiver.of protest" form for a future L.I.D. on
.local streets. The applicant shall be required to get a
right-of-way construction permit in conjunction with the
paving of the driveway aprons.
ADB-22-82 STOP-N-SOCK
There shall be a 20' asphalt apron between the gravel
parking lot and the 238th pavement. A right-of-way
construction permit is required.
A
U
A4
EA
P4
z
0
U
0
E-4
C11TY OF EDMONDS
PUBLIC WORKS DEPARTSIT FOR INSPECTION CALL Permit Djo
t,
C,7
0
0
PU
S, DE SEWER PERMIT 775-2525 Ext. 220 Issue Date 7
PERMIT MUST BE POSTED ON JOB SITE
1. Address of Construction
2. Property Legal Description (include all, easementsi
PL4 ,�- Aurwra 940-1rj�i+-,
3. Single Family Residence Mukti-Family No. of 1-44s. --
Commercial V I A BAEMG
— 2s: LIFT ST llowtij
4. Owner and/or Builder
5. Contractor & License No. Z--,yVAy
6. Invasion into City Right of-L'y: No Yes (If Yes Right-of-
way Construction Permit Required - Call Dial Dig (342-5344) before
excavation).
7. Cross other private property: Yes_ No�� Easement required -
attach legal description and county easement number.
READ THE FOLLOWT-.NG AND SIGN:
a. Property owners must obtain a permit to install side sewers on
their property. A licensed side sewer contractor must be employed to
construct side sewers in the public' right-of-way.
b. The side sewer contractor assumes full reponsibility for each
installation for one year.
c. Commercial establishment requires a minimum of a six inch (6")
side sewer line.
d. Side sewers may not be installed closer than thirty inches (30")
to any structure. 0
e. Side sewer lines must be laid at a minimum grade of 2% (1.15
and maximum grade of 100% (450). 0
f. No turn in side s8wer greater than 45 (1/8,bend) is 0 allowed
between cleanout. A111,90 turns must be constructed of a 45 (1/8
bend) and Wye with removable cap.
g. No down spouts, footing drains or floor drains can be connected
to side sewer system.
h. Pea gravel is require d for bedding when installing sewer lines
through other than granular soil.
i. Cleanouts are required at 30"-60" from each plumbing exit line
and at minimum intervals of 100' along sewer 'line run.
j. Trenches within City right-of-way must be restored to original
conditions. Contractors shall be responsible for right-of"way failure
due to poor compaction of fill.
k.- Side sewer must be left uncovered until inspected and approved
by the City.
hours
1. Inspection during normal working4, o 'y. Two (2) working
days notice required.
,Z
DATE: F I L
certify that I have read
and shall comply With the above
PERMIT FEE: DISAPPROVED BY: Date:
-Tr-( A-YA 't2 -T - .2 —0 By: Date:
04 CON E ION FEE: APPROVED By Date: <p,1111
0 1 1
PERMIT MUST BE POSTED ON JOB SITE
The City of Edmonds Side Sewer Drawing EASEMENT NO . .............................................
NEW CONSTRUCTION ;�r-' REPAIRS r-1 LID NO.,? 4k .... . ASMT. NO . ..................
OWNER .. ........................................... CONTRACTOR
............................. PERMIT NO. 7
...............
JOB ADDRESS ------ ZZZY ... . .. .......... LEGAL DESCRIPTION: LOT NO . ....................................... BLOCK NO . ....................................
0
0
40
PWW-=l-lll75(REV.111?8)
NAME OF ADDITION
4:�� 0 8
................... .. ......
VIA IBALUNGER
LIFT STATION
Approved:
�0-fl aA
DATE -,,J�,Z/"/`"�`--;,� ............... B 0 , �.., i?-. (
City. of. Edmonds
,,,,WT-OF-WAY CONSTRUCTION
PERMIT. Permit NumbAff- 213
Lssue Date:
�C-4�A'A�jdress or Vicinity of Construction
B. Type of Work (be specific):. 2 /7 40, _7�_ kkaj(c
C
C. Contractor: /_ VAIAIAMaD F4W<o��
Maili.ng Addm�s:/
State License#:/ I—
.. . ' g, -
D. Building. Permit # (if applicable): 1�: Y11211
Co ntact: //,�)y /V -761r-S e7-
Phone: 1175- U746,&a1q1,ee /-/i?5_7,07L9,r74,
Liability Insurance:. — Bond: $
Side Sewer Permit # (if applicable):
E. 11 Commercii'l' 'E] Subdivision El City Project E] Utility.(PUD, GTE, WNG, CABLE, W-ATER)
Multi -Family, El Single Family Other
I N S P E C T 0 R: A—/# e-re- V-//— INSPECTOR:
F. Pavement or* Concrete 'but : WYes 0No G. Size of Cut: x H. Chargi�_$
APPLICANT TO READ AND SIGN
INDEMNITY- Applicant undo�r�tands and by his signature to this application to.hold the City of Edmonds harmlessftom injuries, damages, or claims ofany
kind or description whatsoever foreseen or unforeseen, that may be made against the City of Edm onds, or any . of its departinents or
employees, includingor not limite�to the defense ofany legal proceedings including defense costs andattorneyfees by�reason ofgranting thispermit.
THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL INSPEC-
TION AND ACCEPTANCE617 THE WORK. ESTIMATED RESTORATION FEES WILL BE HELD UNTIL THE FINAL STREETPATCHIS COMPLETED
11
BY CITY FORCESA T WHICH TIME A DEBIT OR CREDIT WILL BE PROCESSED FOR ISSUANCE TO THE APPLICANT
Two sets of construction drawings of'proposed work.req'uired with permit application.',
A 24 hour notice is required for inspection.'Plea'se call the Enginee'ring Division, 771-0220.
Work and material is to be inspect9d during progress and at completion.
Restoration'is to be in accordance with City Codes.
Street shall be kept clean at all times.
Traffic Control and Public Safety shall be in accordance with City regulations as required by the City Engineer.
All street cut trench work shall be patched with asphalt or City approved r�aterial prior to the end of the working day;
NO EXCEPTIONS.
I have read the abgre statements and understand the permit requirements and the pink copy of.the permit will be
available on site XA4mesfor inspection purposes.
gnature Date:
,V
E71 (Contractor or Agent)
i1-:1 CALL DIAL -A -DIG PRIOR TO BEGINNING WORK
FOR CITY USE ONLY
APPROVED BY.
TIME AUTHORIZED: VOID AFTER DAYq
SPEClALCONDITIONS:A�x '&wokeez gnvzz_�
,.Voo
RIGHT OF WAY FEE:
DISRUPTION FEE/FUND I H:
RESTORATION FEE:—
OTALFEE: -V7.'w—
RECEIPT NO.: ---
ISSUED BY:
NO WORK SHALL BEGIN. PRIOR TO PERMIT ISSUANCE Eng. Di� 1997
-7T
FIELD INSPECTION NOTES' (Fuirid 111- Route copy to Street Dept.)
Comments:
1,17C. -18913
r4 0 T I C*E
TO PERMITTEE AND/OR OWNER
Ej PARTIAL APPROVAL
F-1 VIOLATION
ED CORRECTIONS REQUIRED
PermitNumber 9'30G4-L— Owner " Ki2
Job Address 2- v 5 c> 4- -2 2- A v6 v,--'
NO PERMIT -STOP WORK -REMOVE CONSTRUCTION OR OBTAIN PERMIT AND MAKE WORK COMPLY
Lj WITH ALL APPLICABLE CITY CODES.
F-1 CONSTRUCTION Is NOT IN ACCORDANCE WITH APPROVED PLANS AND PERMIT - STOP WORK.
MAKE WORK COMPLY WITH APPROVED PLANS AND PERMIT OR REMOVE.
F-1 STOP WORK - UNTIL AUTHORIZED To CONTINUE By CIT Y INSPECTOR.
F-1 CORRECTIONS LiSTED BELOW M ' UST BE MADE: BEFORE WORK CAN BE APPROVED AND/OR THE
NEXT PHASE IS STARTED; To AVOID POSTING OF A STOP WORK ORDER, ORDER To
CORRECT, OR ABATEMENT PROCESS.
LjJOB CARD MUST BE POSTED ON SITE AND BE VISIBLE FROM STREET.
F-1 APPROVED PLANS MUST BE AVAILABLE To INSPECTOR ON SITE.
LjWORK DESCRIBED BELOW HAS BEEN INSPECTED AND Is APPROVED.
F-Y-1 CONTACT INSPECTOR AND ARRANGE FOR APPOINTMENT.
LjRECALL FOR INSPECTION.
-1:9"
A, f'�0,--jD ru-�exse \ncs.
&L W1 C, I
d p'% 4 e- ek� k—jeA& C'rs
--x J
_j rl�,
0 e— e>* -7
THE ACTIONS OR CORRECTIONS INDICATED ABOVE ARE REQUIRED WITHIN
DAYS OR PENALTIES MAY BE APPLIED. FOR INSPECTIONS CALL 771-0220.
LjBuilding Division OPlanning Department Z) Engineering Department FIFire Department
CITY OF EDMONDS
rz w Inspector MAY 7L I Date
AUu 2 5 1997
PERMIT COUNTFF-�q:
GEOTECHNICAL ENGINEERING RE'PORT
2 Ih
08. STREET CONCOMINIUMS�
SNOHOMISH COUNTY, WASHINGTON
FOR
PETER SCHROEDER ARCHITECTS
NELSON- COUVRETTE ASSOCIATES, INC.
CONSULTING GEOTEC NICAL ENGINEERS, GEOLOGISTS
AND ENVIRONMENTAL SCIENTISTS
17311-135th Avenue NE, A-500 Snohomish County (425) 337-1669
Woodinville WA 98072
(425)486-1 669 - Fax �81 -2510
July 24, 1997
Mr. Peter Schroeder
Peter Schroeder Architects
1904 Third Avenue, Suite 1005
Seattle, Washington 98 101
Geotechnical Engineering Report
209th Street Condominiums
Edmonds, Washington
NCA File No. 210097
Dear Mr. Schroeder:
Wenatchee/Chelan (509) 784-2756
INTRODUCTION
This report presents the results of our geotechnical engineering evaluation for your planned 208th Street
Condominiums project in the city of Edmonds. The site is locatedi at the southwest comer of the
intersection of 208th Street Southwest and 72nd Avenue West, as shown on the Vicinity Map in Figure
1. You have provided us with a drawing dated March 6, 1997, titled "20,8th Street SW Condominiums".
The site consists of a "C" shaped parcel, approximately 1.4 acres in siz�e. The site is generally flatlying
with a gentle downward gradient to the southwest. A school is currently located at the site. As part of
the development of the site,the existing structures will be remo*ed. The project includes the
construction of four condominiums and townhome buildings with pavid parking and access roadways
Infiltration is being considered for storm water runoff at the project. The finished floor elevation of the
building at the north end of the site will have an elevation of 417 or 418 feet. Cuts up to 7 feet in height
will be necessary to create a level building pad for the structure. The remaining portions of the site are at
or near grade. The site will be accessed from 72nd Avenue West at two.1 locations. The proposed layout
is indicated on the Site Plan in Figure 2.
Geotechnical Engineering Report
208th Street Condominiums
July 24 1997
,NCA File No. 210097
Page 2
The first infiltration tests were run on shallow soils as we found low per'�neability silty zones in the 3 to 5
foot range below the ground surface. The elevation of the tests we j r'e kept above these silty zones.
However, we broke through these soils in one of our test pits. FolloWling discussions with your civil
engineer, Mr. Bill Fortunato, concerning the feasibility of deeper infiltration galleries or pits, it was
decided to complete additional tests at deeper locations. These testifound favorable results and are
presented in this report. The shallow tests are not considered reprejentative as the galleries 'will be
deeper.* Therefore, the results from the shallow tests are not presente d ii� this report.
SCOPE
The purpose of this study is to explore the subsurface conditions and to rovide recommendations for site
development. Specifically, our scope of services includes the followingl!
Explore the site with backhoe excavated test pits to evalila'te the subsurface soil and
ground water conditions.
2. Provide recommendations for site preparation, drainage' grading and structural fill.
3. Provide recommendations for foundation design.
4. Perform infiltration tests as required by the City of Edm".6nds.
1
5. Prepare a written report to document our findingsand rolcommendations.
SITE CONDITIONS
Surface
The "C" shaped parcel is about 1.2 acres in size and is located at the southwel't comer ofthe intersection of 208th
Street Southwest and 72nd Avenue West. The ground slopes downward gently� from the northeast comer of the site
toward the southwest with a vertical change in elevation of about 6 feet. Below the gentle slope, the ground is flat
lying with a very gentle downward gradient to the southwest. A total charige in elevation across the site was
measured from the site plan provided to be on the order of 13 feet.
Currently, three single -story buildings are located at the site. A concr('te slab basketball court and play
i
ground equipment are also at the site. These structures will be removold as part of the development. A
few scattered evergreen trees and lawn areas vegetate the site.
Geology.
Most of the Puget Sound region was affected by past intrusion of conti n�entail glaciation. The last period
of glaciation, the Vashon Stade, ended approximately 10,000 to l.j,000 years ago. Many of.the
NELSON-COUVRgTTE &ASSOCIATES, INC.
Geotechnical Engineering Report
208th Street Condominiums
July 24, 1997
NCA File No. 210097
Page 3
geographic features seen today are a result of scouring and overriding by glacial ice. During the Vashon
Stade, the Puget Sound region was overridden by. over 3,000 feet of ice.:,; Soil layers overridden by the ice
sheet were compacted to a much greater extent than those that were 'not. A typical glacial sequence
includes glacial drift overlying advance outwash sand.
The geologic units mapped for this area are shown on the
by Mackey
Smith (U.S.G.S., 1975). The site vicinity is mapped as glacial till and Odvance outwash. The glacial till
consists of a dense, non -sorted mixture of clay, silt, sand and gravel.., The advance outwash deposits
consist of stratified sands and gravels. Our explorations encountered g� acial drift and advance outwash.
Glacial drift is similar to glacial till in composition, but is typicallmi less dense and indicates some
sorting.
Subsurface Conditions
Subsurface conditions were explored at the site by excavating twel,,�e test pits with a rubber -tired
backhoe. The test pits extended to depths of 5 to 13 feet below the surfil;ce. The test pits were located in
the field by a geologist with this firm, who classified the soils encounjered and maintained logs of the
explorations. The test pit locations are shown on Fi ure 2. The soilswere visually classified in general
9
accordance with the Unified Soil Classification System, shown as Figu-re 3. The samples were brought
back to our laboratory for further classification. Logs of the test pits ai�p presented in Figures 4 through
7.
A surficial layer of crushed rock, sod or topsoil, 0.3 to 1.0-foot in thick, ness, was encountered in all of
our explorations. A layer of fill was encountered underlying the surfici4l soils in Test Pits 1, 4, 5, 7*, and
8. The fill was generally less than 2 feet thick, except in Test Pit 7, vf:here it was found to be 4.3 feet
deep. Based on this data, we would expect' localized areas of fill to (,ixist elsewhere on site. The fill
generally consisted of loose, silty sand with gravel, roots, abandoned stiorm pipes and pieces of asphalt.
Test Pits I and 4 encountered a layer of buried topsoil, 0.2-foot in thi�`kness, underlying the fill. Test
Pits 1, 2, and 5 through 10 encountered a layer of weathered drift, 0.5 td: 3.0 feet in thickness, underlying
the surficial soils. These soils generally consist of medium dense, fi le to medium. sand with varying
I ' I
amounts of silt, roots and gravel. Underlying the weathered soil horizol and underlying the crushed rock
in Test Pit 3, medium dense to dense, fine to medium sand with silt, gT'avel, occasional fine to medium
sand pockets and lenses of silty sand were encountered. In general4 the.silt content increased with
NELSON-COUVROTTE & A SSOCIA TES, INC.
Geotechnical Engineering Report
208th Street Condominiums
July 24, 1997
NCA File No. 210097
Page 4
increasing depth and a dense, silty fine sand layer was encountered 4 fo 5 feet below the surface. We
have classified these soils as glacial drift.
Test Pit 7, 11 and 12 encountered dense, fine to coarse sand with grav;1 underlying the drift. We have
interpreted these soils to be an outwash deposit. Test Pits I I and 12 were excavated during a second site
exploration program to evaluate the lower outwash soils for infiltration (1haracteristics.
Hydrologic Conditions
Ground water seepage was observed at depths of I I and 10 feet in Test Pits 11 and 12, respectivel
Y-
These ground water levels were observed following the completion of bur infiltration tests. That is, we
excavated to the depth of the test and completed the testing which included a soaking period. We left the
test pits open for a period of time and although the seepage continued iff:to the pit, it slowed considerably
as it neared the depth recorded on the logs. We expect this lower water to be a water table that extends
under most of the site, if not further.
We would expect shallow ground water to perch on the less permea ble glacial drift so ils during the
wetter portions of the year. Perched water occurs when surface water in,tiltrates through less dense, more
permeable soils and accumulates on top of the underlying, less permeal�le soils. Perched water does not
represent a regional ground water "table" within the upper soil horizons� It should be noted that the local
volumes of perched ground water will vary, depending upon the time of year and the upslope recharge
conditions.
Infiltration Test.
We completed two infiltration tests at the site in general accordance with the EPA Design Manual
Number 35: Onsite Wastewater Treatment and Disposal Systems (JaP!uary, 1980). These tests were
located in.the proposed infiltration areas and are indicated on the Site Plan. The soils encountered at the
testing depths consisted of fine to coarse sand with seams of sand with '$ilt. A PVC pipe, 2 feet in length
and 6 inches in diameter, was installed into the excavated hole and driven approximately 6 inches into
the underlying soils. The bottom of the PVC pipe was 9.0 and 8.5 feet below the ground surface in
Infiltration Tests 4 and 5 respectively. Soil was placed around the p:�qipe and compacted. A couple of
inches of pea gravel was placed at the bottom of the pipe to minit:'hize scour. The pipe was then
continuously filled with water and the soil was allowed to saturate for minimum of 90 minutes. After
the saturation period, the time needed for the water in each pipe to "drop a distance of 6 inches was
NELSON-COUVROTTE & ASSOCIATES, INC.
Geotechnical Engineering Report
208th Street Condominiums
July 24, 1997
NCA File No. 210097
Page 5
recorded. The test was run three times at each location.. The infiltratk"'M rates for the two test locations
are presented in the table below.
Test Feet Length of Soak Test I Test 2 Test 3 Average
Number Below (Minutes) (Minutes/Inch) (Minutes/In"ch) (Minutes/Inch) (Minutes/Inch)
Surface
IT-4 9 90 0.1 0. 1 .: 0.1 0.1
IT-5 8.5 . 95 0.11 0.11 � 1 0.12 0.11
We consider that these infiltration values would be appropriate for the soils below 6.5 feet at the test
locations.
CONCLUSIONS AND RECOMMENDATIONS
General
The underlying glacial soils will provide adequate support for the proposed development. it is our
opinion that the planned structures may be supported on conventional shallow spread footings.
Foundations should extend through any fill, topsoil or loose surface � 3 oils and bear on the'underlying
medium dense to dense' soils or structural fill extending to these soils.:. Our investigation. revealed that
areas of fill exist at the site up to 4.3 feet in thickness. Where deeper fill exists, the foundations may be
extended by utilizing deepened footings, longer stem walls, controlled density fi 11 (CDF) or rock
trenches. These *are described in the Foundation sub -section of this r ep6rt.
Where the fill exists within building slabs and pavement areas, the .fill and buried topsoil could be
removed and replaced with structural fill. If some settlement is toleratile, another option is to compact
the surface of the fill to a firm, non -yielding state. Areas observed to 'ump and weave excessively will
p
need to be repaired. Providing that the fill surface is not observed to pump and weave, the settlement
should be within normal tolerances of less than one inch. The risk is that pockets of highly organic or
very loose soil exist, although we did not observe these conditions.
The soils likely to be exposed during construction are moderately to hi . ghly moisture sensitive and will
disturb easily when wet. We recommend that construction take place during the drier summer months.
If construction takes place during the wet season, additional expenses atid delays should be expected due
NELSON-COUVRETTE & ASSOCIATES, INC.
Geotechnical Engineering Report
208th Street Condominiums
July 24, 19 97
NCA File No. 210097
Page 6
to the wet conditions. These expenses would be associated with. the �:importing of rock spalls for the
roadways and potential delays in the project.
Erosion Control Measures
The site soils are considered slightly susceptible to erosion when stripped of vegetation. Erosion control
methods should be undertaken to prevent surface runoff from flowingi, off site. A. silt fence should be
constructed below the construction area. Excavation cuts exposed io wet weather should be covered with.
plastic sheeting and properly anchored in place. After construction� the disturbed areas should be
revegetated and the vegetation should be maintained until it is established. Where the vegetationhas not.
been disturbed, erosion should'be minimal. Erosion control measures should conform to applicable City
requirements.
Site Preparation and Grading
One option for development of the site is to remove the topsoil, fill and,,buried topsoil throughout the site
and replace it to proposed grade. with structural fill in building and pavement areas. With this method,
areas to receive structural fill should be stripped of existing fill and bi� iried topsoil down to firm native
soils. These areas should be compacted to a dense., non -yielding condition after stripping. Any areas
observed to. pump and weave excessively should be overexcavated iind replaced with structural fill.
Areas that are wet may require a blanket of spalls prior to placing fill, in order to achieve a suitable base.
This should be evaluated at the time of site preparation. We do not anticipate problems with wet soils if
site work is accomplished during the dry time of the year. The removaJ of the fill and replacement with
structural fill is expected to perform the best with the least amount of p6st-construction settlement.
Another option, if some settlement is tolerable, is to strip the sod off the site and leave the topsoil and fill
in place. Following removal of the sod, the roadway and building areas should be compacted to a dense,
non -yielding condition. Areas where the subgrade is observed to weaye excessively during compaction
should be repaired. This method may be suitable for pavement or slab�.areas where some settlement can
be tolerated. The impact of settlement on slabs can be reduced (�y suitably reinforcing the slab.
Alternative site preparation methods and repairs should be determined. based on conditions observed in
the field. If the subgrade is prepared as described, we estimate settlemrits on the order of 1 inch or less,
based on the known depths and types of fill. .
NELSON-COUVRifTTE & AssoclATEs, INC.
Geotechhical Engineering Report
208th Street Condominiums
July 24, 1997
NCA File No. 210097
Page 7
If earthwork is to be accomplished during wet weather, we recommend. that a blanket of rock spalls be
placed in the planned access roadway. The thickness of the spalls should be based on soil conditions at
the time that the site is developed and their performance under heavy equipment. We recommend using
a minimum of 6 inch thickness of spalls in traffic. areas for estimating pKirposes.
Temporary and Permanent Slopes
Temporary cut slope stability is a function of many factors such as the type and consistency of soils,
depth of -the cut, surcharge loads adjacent to the excavation, length of -time a cut remains . open and the
presence of surface or ground water. It is exceedingly difficult under1hese variable conditions to pre-
establish a "safe and maintenance -free" temporary cut slope angle, . Therefore, it should be the
responsibility of the contractor to maintain safe slope configurations si.11ce he/she is continuously at the
job site, able to observe the nature and condition of the cut slopes, and able to monitor the subsurface
materials and ground water conditions encountered.
We anticipate cuts on the order of 5 to 7 feet will be needed in the northern portion of the site for the
foundation for Building A. The proposed building will be 15 feet �Way from the adjacent property
boundary. For planning purposes, we recommend that temporary cuts',:in the fill be no greater than L5
Horizontal to I Vertical (1.5H:IV) and in the weathered drift be no steeper than a IH:IV inclination.
The proposed excavation should meet these slope requirements withiA. the property lines. If perched
ground water is encountered, we would expect that flatter inclinations would be necessary. We
recommend that cut slopes be protected from erosion. Measures taken'may include covering cut slopes
with plastic sheeting and diverting surface runoff away from the top of cut slopes. We do not
recommend vertical slopes for cuts deeper than 4 feet, if worker access is necessary. We recommend
that cut slope heights and inclinations conform to appropriate local, stat and federal regulations.
Final slope inclinations for structural fill and the native soils should be: no steeper than 2H: IV. Lightly
compacted fills or common fills, should be no steeper than 3H:IV. Common fills are'defined as fill
material with some potential organics that are "trackrolled" into phice. They would not meet the
compaction -specification of structural fill. Final slopes should be vegetated and covered with straw or
jute netting. The vegetation should be maintained until it has been established.
NELSON-COUVROTTE & ASSOCIATES, INC.
Geotechnical Engineering Report
208th Street Condominiums
July 24, 1997
NCA File No. 210097
Page 8
Structural Fill
General: All fill placed beneath buildings, pavements or other settlement sensitive features should be
placed as structural fill. Structural fill, by definition, is pl*aced in accordance with prescribed methods
and standards and is monitored by an experienced geotechnical professional or soils' technician. Field
monitoring procedures would include the performance of a represent;�'tive number of in -place density
tests to document the attainment of the desired degree of relative compa' ction. The area to receive the fill
should be prepared as outlined in the Site Preparation and Grading su�,_section of this report.
Materials: Imported structural fill should,consist of a good quality, fr�,ee draining granular soil, free of
organics and other deleterious material and be well graded to a =ximurn size of about 3 inches.
Imported all weather fill should contain no more than about 5 percent,fines (soil finer than a U.S. No.
200 sieve) based on that fraction passing the U.S. No. 4 sieve.
i
Some of the on -site soils contain a significant percentage of fine-grained particles and are moderately to
highly moisture sensitive. The use of the on -site soils as fill should be limited to extended periods of dry
weather. Even during periods of dry weather, some discing for drying and watering may be necessary to
achieve the desired moisture content. We recommend that these soii.s. be considered for fill, only if
construction takes place during the drier summer months. The existing fill contains a s . ignificant
percentage of fine-grained par.ticles and debris, and are considered highi.y moisture sensitive. Use of this
fill may require segregation if unsuitable, organic -rich soils are encountered.
Fill Placement: Following subgrade preparation, placement of the .9"tructural fill may proceed. All
backfilling should be accomplished in 8- to 10-inch-thick uniform lifts. Each lift should be spread
evenly and be thoroughly compacted prior to placement of subsequent li.fts. All structural fill underlying
building areas and within 2 feet of pavement subgrade, should be compacted to a minimum of 95 percent
of its maximum dry density. Maximum dry density in this report refers� to that density as determined by
the ASTM D 1557 compaction test procedure. Fills more than 2 feet beneath sidewalks and pavement
subgrades should be compacted to a minimum of 90 percent of th('1,1;,ir maximum dry density. The
moisture content of the soils to be compacted should be within about,2 percent of optimum, so that a
readily compactable condition exists. It may be necessary to overexcav4te and remove wet soils in cases
where drying to a compactable condition is not feasible. All compa6t,ion should be accomplished by
equipment of a type and size sufficient to attain the desired degree of coinpaction.
NELSON-COUVR4TTE &ASSOCIATES, INC.
Geotechnical Engineering Report
208th Street Condominiums
July 24, 1997
NCA File No. 210097
Page 9
Foundations
Foundations may be supported on the underlying medium dense to dense glacial soils or structural fill
i
extended to these soils. We recommend that where overexcavation and replacement with structural fill
or rock spalls are used, the trenches should be excavated wide enough to allow for a 0.5 Horizontal to 1.0
Vertical (0.5H: LOV) line below the footing in the backfill. That is, for every 2 feet of structural fill or
rock spalls below the foundation, the trench should be an additional I f'oot in width outside each side of
the footing. Controlled density fill (CDF) is a lean concrete mix. If OF is used, the trench excavation
need be only slightly wider than the footing. Therefore, the use of CDF would minimize the volume of
excavation. Using the trenching method (not.total overexcavation and'�� repl acement), settlements of the
surrounding fill may occur and could cause some distress to the building slab and/or pavement areas.
These should be compensated for in the design.
Footings should be located at least 18 inches below the adjacent grilde for frost protection. During
footing excavation, the upper 6 to 8 inches of footing subgrade is li kely to become disturbed. The
resulting footing subgrade should be compacted to a firm and non -yielding surface or the loose material
should be removed prior to pouring footings.'
We recommend an allowable soil bearing pressure of 3,000 pounds per square foot (psf) be used for
design of shallow footings founded into the undisturbed medium dense to dense glacial soils. All
footings should be sized according to the anticipated wall or column loads and the above soil bearing
values. Minimum footing widths of 18 and 24 inches are recommend ��d for all continuous and isolated
footings, respectively. Footings should be excavated and poured in a timely manner. Footing areas
should be free of ponded water and sloughed or water loosened soils prior to placement of footing
concrete. Higher bearing capacities can be provided for specific locations and designs if desired. We
should be contacted to review specific plans if higher bearing capilcities are needed. A one-third
increase in the above allowable bearing pressure may be used when �Qnsidering short-term transitory
wind or seismic loads.
Foundation settlement, using the above allowable bearing pressures, should be less than 1.0 inch total
and 0.5 inch differential across the structure, based on our experien(��e with similar projects. Higher
bearing pressures can be used based on specific foundation widths. We recommend that we review
specific plans if higher design bearing pressures are desired.
NELSON-COUVRItTTE & ASSOCIATES, INC.
Geotechnical Engineering Report
208th Street Condominiums'
July 24, 1997
NCA File No. 210097
Page 10
Lateral loads may be resisted by friction at the base of the foundation and by passive pressures against
the foundation. We recommend using a coefficient of friction of 0.7. between the foundation and the
underlying soil. Where structural fill is placed against the foundation, a'passive pressure of 450 pcf may
be used. We recommend appropriate safety,factors be applied to the preceding values.
Retaining Walls
The lateral earth pressure acting on retaining walls. is dependent on the nature and density of the soil
behind the Wall, the amount of lateral wall movement which can, occur as backfill is placed and the
inclination of the backfill. Walls that are free to yield at least one -thousandth of the height of the wall
are in an "active" condition. Walls restrained from movement by stiffitess or bracing are in an "at rest"
condition. Active earth pressure and at rest earth pressure can be calculated based on equivalent fluid
density. Equivalent fluid densities for.active and at rest earth pressure. of 35 and 50 pcf, respectively'
may be used for design for a level backslope. These values assume that the on -site soils are used for
backfill and that the wall backfill is drained. The preceding values do not include the effects of
surcha . rges, such as due to foundation loads, traffic or other surface loads. Surcharge effects should be
considered where appropriate.
The above lateral pressures may- be resisted by friction at the base of the wall and passive resistance
against the foundation. A coefficient of friction of 0.5 may be used todetermine the base friction in the
glacial soils. An equivalent fluid density of 250 pcf should be used for.passive resistance design. These
recommended values incorporate safety factors of 1. 5 and 2.0 applied toi the estimated ultimate values for
frictional and passive resistance, respectively. To achieve this value of passive pressure, the foundations
should be poured "neat" against the native dense soils or compacted fill should be used as backfill
against the front of the footing, and the soil in front of the wall should extend a horizontal distance equal
to at least three times the foundation depth. We recommend that the 'Upper I foot of soil be neglected
when determining the passive resistance.
All wall backfill should be well compacted. Care should be taken to prevent the buildup of excess lateral
soil pressures due to overcompaction of the wall backfill. This can be accomplished by placing w all
backfill in 8-inch loose. lifts and compacting with small hand operated compactors.
Permanent drainage systems should be installed for retaining walls. We recommend that these drainage
systems consist of an 18-inch-wide zone of clean (less.than 3 percent fines), free draining granular
NasoN-CouvRETTE & AssoclATEs, INC.
Geotechnical Engineering Report
208th Street Condominiums
July 24, 1997
NCA File No. 210097
Page I I
material placed along the back of the wall. Pea gravel is an acceptal�le drain material. The. granular
material should be placed up the back of the wall to within I foot.,`. of the ground surface. A less
permeable soil should be placed in the last I foot to reduce surface infiltration into the wall drain. The
on -site surficial soils are not suitable for use as free draining wall back1lill. A slotted drain pipe having a
minimum. diameter of 4 inches should be embedded in pea gravel or somm other free draining material at
the base of the wall and along its entire length. This drain pipe should dtischarge into tightlines -leading to
an appropriate collection and discharge point. Roof drains should not! be connected to wall or footing
drains.
Slabs -On -Grade
Floor slabs may be supported on subgrade prepared as outlined in the� Site Preparation and Grading.
and Structural Fill sub sections of this report. The least amount of risk of settlement will be from the
overexcavation of the entire fill and replacement with structural fill scheme. Some settlement should be*
expected if the alternative site preparation method is used. The impact of these settlements can be
reduced if the slab is suitably reinforced. We recommend that the slabs be founded on a minimum of I
foot of structural fill if they are to be placed above the existing fill.
Where moisture control is important, we recommend that at least 6 inches of free draining material be
placed under slabs -on -grade to act as a capillary break. The capillary break material should be separated
from slabs by a vapor barrier such as plastic sheeting. To aid in curing* the concrete, a 2-inch-thick. sand
blanket may be used to cover the vapor barrier. The capillary break material should be connected *to the
footing drains to provide positive drainage.
Some risk of settlement and/or cracking should be expected of any sl4b placed above the existing fill.
Where slabs are placed above the existing fill,'they should be reinforo.'ed to withstand some differential
settlement. A gap should be provided between the slab and adjacent f6undation wall or columns so that
the slab can settle without being "hung up" causing a bridging condition. This is commonly done by
placing a felt expansion strip between the slab and foundation wall. Where slabs transition through
doorways, they should be reinforced to prevent vertical offsets, caused by settlement, to occur. The
transition slab is a reinforced structural slab that is doweled into the foundation and the slab -on -grade.
As settlement occurs, the dowels act as hinges allowing rotational movement without vertical offsets at
the slab joints.
NELSON-COUVRETTE & AssociATEs, INC.
Geotechnical Engineering Report
208th Street Condominiums
July 24, 1997
NCA File No. 210097
Page 12
Drainage
We recommend that runoff from impervious surfaces such as roofs, driveway and access roadways be
collected . and routed to an appropriate storm water discharge system. The roof drains should be
tightlined separate of the footing or wall system drains until they are; a minimum of I foot vertically
down gradient from the footing drains.
The finished ground surface should be graded such that storm water is,collected and directed off of the
site. Final site grades should allow for drainage away from any buildings. We suggest that the finished
ground be sloped at a gradient of 3 percent minimum for a distance cif at least .10 feet away from the
buildings. Surface water should be collected by permanent catch basin.� and drain lines t o be discharged
into a storm drain system.
It is good practice to use footing drains for moisture control. However, footing drains may be optional if
the resulting site grade slopes away from the planned structures or if the slabs are a minimum of I foot.
above surrounding grades. This tan be evaluated at the time of construction.
If perimeter footing drains are not used, appropriate moisture control should be utilized. Measures taken
should include providing a suitable capillary -break and vapor barriev for slabs -on -grade and sloping
crawl spaces to drain. Vapor barriers should be used for slabs in any case where moisture control is
important. A drain should be installed to allow water that may accumul�te in a crawl space to drain from
the crawl space. We recommend that wall drains be utilized around bastment walls.
The footing drain should consist of a 4-inch-minimum-diameter, perf6rated or slotted, rigid, PVC pipe
laid at the bottom of the footings or a minimum of 6 inches below the"bottom of interior slabs or crawl
spaces, whichever is deeper, with a gradient sufficient to generate flow by gravity. The drain line should
be surrounded with free draining pea gravel.
The on -site infiltration systems should be designed using the infiltration rates provided in the
Infiltration Test section of this report. We consider that these infiltration rates can be used on the soils
found below 6.5 feet below the ground surface in the area the tests.. were taken. The DOE manual
suggests locating the infiltration pits a minimum of 100 feet up gradient" of structures. We consider this a
general guideline for shallow systems. Due to the depth of the soils that will infiltrate water, we do not
consider a setback of the system to the structure to be needed. In our opinion, any problems that would
NELSON-COUVR#TTE & ASSOCIATES, INC.
Geotechnical Engineering Report
208th Street Condominiums
July 24, 1997
NCA File No. 210097
Page 13
be associated with a nearby infiltration system would be moisture control not beating capacity or
stability. Therefore, installation of a proper capillary break and vap6r barrier is more important that
locating the system away from the structure. If the slab or crawlspice is at or'near the surrounding
grades, foundation drains should be considered. It would be best to locate slabs a minimum of 140ot
above the surrounding grades. This can be reviewed at the time of design, if needed.
USE OF THIS REPORT
We have prepared this report for Mr. Peter Schroeder and his agents tor use in planning and design of
this project. The data and report should be provided to prospective tontractors for their bidding and
estimating purposes. However, our report, conclusions and interpretations should not be construed as a
warranty of subgrade conditions.
The scope of our work does not include services related to constru( Aion safety precautions and our
recommendations are not intended to direct the contractors' methods, techniques, sequences or
procedures, except as specifically described in our report for consideration in design. There are possi - ble
variations in subsurface conditions. We recommend that project pl�nning include contingencie s in
budget and schedule should areas be found with conditions that vary from those described in this report.
We should be retained to provide monitoring and consultation services during construction to confirm
that the conditions encountered are consistent with those indicated iby the explorations, to provide
recommendations for design changes should.the conditions revealed during the work differ from those
anticipated, and to evaluate whether or not earthwork and foundation installation activities comply with
contract plans and specifications.
Within the limitations of scope, schedule and budget for our services, We have strived to take care that
our work has been completed in accordance with generally accepted practices followed in this area at the
time this report was prepared. No other conditions, expressed or implied, should be understood.
000
NELSON-COUVREiTTE & ASSOCIATES, INC.
Geotechnical Engineering Report
208th Street Condominiums
July 24, 1997
NCA File No. 210097
Page 14
We appreciate the opportunity to be of service to you. If there are an questions concerning this report
y
or if we can provide additional services, please call.
Sincerely,
NELSON-COUVRETTE & ASSOCIATES, INC.
Andrea L. Ernst
Senior Staff Geologist
EXPIRES -/'7'
Charles P. Couvrette, PE
Principal Engineer
LMH:ALE:CPC:nt
Three Copies Submitted
Seven Figures
NELSON-COUVR19TTE & ASSOCIATES, INC.
N
Vicinity Map:
A B C
0-
4
�e,
X-
I 77�
2MO
K
TH
7 Z,
.4.
Project 20M
:77
r Site
ki ri
6
73
1 2TH
7i-
q,
1Y
j:
::-L .;q.
"!,J
....... .. ..
21M
226�H�4'
7
"T
.4r I
2 22
2
LLJ
I A
47-4,
Bros. Maps
FIGURE
NasoN-Coumrm & ASSOCIATEs, INc. 208th StCondos
CONSULTING GEOTECHNICAL ENGINEERS, GEOLOGISTS
AND ENVIRONMENTAL SCIENTISTS FILE NO. DATE
210097 July 1997
UNIFIED SOIL CLASSIFICATION SYSTTM
MAJOR DIVISIONS
GROUP
SYMBOL
GROUPNAME
GRAVEL
CLEAN GRAVEL
GW
W . ELL -GRADED GRAVEL, FINE TO COARSE GRAVEL
COARSE -
GRAINED
MORE THAN 50% OF
GP
POORLY -GRADED GRAVEL
COARSE FRACTION
GRAVEL
SOILS
RETAINED ON NO. 4
SIEVE
WITH* FINES
GM
SILTY GRAVEL
GC
CLAYEY GRAVEL
MORE THAN 50%
RETAINED ON
NO. 200 SIEVE
SAND
CLEAN SAND
SW
WELL -GRADED SAND, FINE TO COARSE SAND
SID
POORLY -GRADED SAND
MORE THAN 50% OF
SAND
COARSE FRACTION
PASSES NO. 4 SIEVE
WITH FINES
Sm
SILTY SAND
SC
CLAYEY SAND
SILT AND CLAY
INORGANIC
ML
SILT
FINE -
CIL
CLAY
GRAINED
LIQUID LIMIT
LESS THAN 50%
SOILS
ORGANIC
OL
ORGANIC SILT, ORGANIC CLAY
MORE THAN 50%
PASSES NO. 200 SIEVE
SILT AND CLAY
INORGANIC
MH
SILT OF HIGH PLASTICITY, ELASTIC SILT
CH
CLAY OF HIGH PLASTICITY, FAT CLAY
LIQUID LIMIT
50% OR MORE
ORGANIC
OH
ORGANIC CLAY, ORGANIC SILT
HIGHLY ORGANIC SOILS
PT
SAT
NOTES:
SOIL MOISTURE MODIFIERS
1 Field classification Is based on
visual examination of soil In general Dry- Absence of moisture, dusty, dry
accordance with ASTM D 2488-83. to the touch
Moist- Damp, but no visible water
2) Soil classification using laboratory
tests Is based on ASTIVI D 2487-83. Wet- \Asible free . water or saturated,
usually Sol Is obtalned.from
3) Descriptions of soil density or below wdter table
consistency are based on
Interpretation of blowcount data,
visual appearance of solls, and/or
test data.
NELSON-COUVRE7TE &ASSOCIATES, INC.
UNIFIED SOILCLASSIFICATION SYSTEM
CONSULTING GEOTECHNICAL ENGINEERS, GEOLOGISTS
AND ENVIRONMENTAL SCIENTISTS
FIGURE 3
LOG OF EXPLORATION
DEPTH Usc SOIL DESCRIPTION
TEST PIT ONE
0.01-0.3
CRUSHED ROCK q:
0.3-1.0
SP-SM
BROWN FINE TO MEDIUM SAND WITH SJLT, GRAVEL. AND ROOTS (LOOSE,
MOIST) (FILL)
1.0-1.2
BURIED TOPSOIL
1.2-4,.6
SP-SM
BROWN TO GRAY FINE TO MEDIUM S�ND WITH SILT AND SCATTERED
COBBLES (MEDIUM DENSE, MOIST) (WEAT$ERED DRIFT)
4.6-5.0
sm
GRAY SILTY FINE TO MEDIUM SAND WITH 4RAVEL (11DENSE, MOIST) (DRIFT)
SAMPLES WERE COLLECTED AT 0.5,2.0 AISP 5.0 FEET
GROUND WATER SEEPAGE WAS NOT ENCqUNTERED
TEST PIT CAVING WAS NOT ENCOUNTERE
TEST PIT WAS COMPLETED AT 5.0 FEET 017 06-04-97
TEST PIT TWO
0.0-1.0
sm
DARK BROWN/BLACK SILTY SAND WITH Gl�AVEL AND ROOTS (LOOSE, MOIST)
(TOPSOIL)
1.0-4.4 SP-SM BROWN FINE TO MEDIUM SAND WITH SV AND GRAVEL (MEDIUM DENSE,
MOIST) (WEATHERED DRIFT)
4.4-5.3 SM GRAY SILTY FINE TO MEDIUM SAND WITH q.RAVEL (DENSE, MOIST) (DRIFT)
SAMPLES WERE COLLECTED AT 2.5 AND 5.6 FEET
GROUND WATER SEEPAGE WAS NOT ENC§UNTERED
TEST PIT CAVING WAS NOT ENCOUNTERED
TEST PIT WAS COMPLETED AT 5.3 FEET ON 06-04-97
TEST PIT THREE
0.0-0.3
CRUSHED ROCK
0.3-6.0 SP
BROWN TO GRAY FINE TO MEDIUM SAND WTH GRAVEL AND TRACE SILT, 1.5
FOOT FINE TO MEDIUM SAND LENSE AT 1.4 FEET, AND SILTY SAND LENSES AT
5.5 FEET (MEDIUM DENSE TO DENSE, MOIST) (DRIFT)
SAMPLES WERE COLLECTED AT 2.0,4.0 AND 5.5 FEET
GROUND WATER SEEPAGE WAS NOT ENCqUNTERED
TEST PIT CAVING WAS NOT ENCOUNTEREC)
TEST PIT WAS COMPLETED AT 6.0 FEET ON 06-04-97
TEST PIT FOUR
0.0-0.5
SOD
0.5-2.0 SM
BROWN SILTY SAND WITH GRAVEL AND ROO.TS (LOOSE, MOIST) (FILL)
2.0-2.2
BURIED TOPSOIL
2.2-5.0 so-sm
BROWN TO GRAY FINE TO MEDIUM SAND! WITH SILT AND GRAVEL (MEDIUM
DENSE TO DENSE, MOIST) (DRIFT)
5.0-5.5 SM
GRAY SILTY FINE TO MEDIUM SAND WITH d RAVEL (DENSE, MOIST) (DRIFT)
SAMPLES WERE COLLECTED AT 1.0, 4.0 ANP 5.0 FEET
GROUND WATER SEEPAGE WAS NOT ENCOUNTERED
TEST PIT CAVING WAS NOT ENCOUNTEREO
TEST PIT WAS COMPLETED AT 5.5 FEET 04 06-04-97
LMH:dfr
NELSON-CCIYVRETTE &ASSOCIATES, INC.
FILE NO. 210097
FIGURE 4
LOG OF EXPLORATION
DEPTH Usc SOIL DESCRIPTION
TEST PIT FIVE
0.0-0.3
CRUSHED ROCK
0.3-1.0 SM
BROWN SILTY FINE TO MEDIUM SAND W&H CRUSHED ROCK AND A STORM
PIPE (LOOSE, MOIST) (FILL)
1.0-2.0 SM
GRAY -BROWN SILTY FINE TO MEDIUM )S.AND WITH GRAVEL AND ROOTS
(MEDIUM DENSE, MOIST) (WEATHERED DR(FT)
2.0-5.5 SP/Sm
GRAY FINE TO MEDIUM SAND WITH SILt GRAVEL, FINE TO MEDIUM SAND
POCKETS, AND SILTY SAND LENSES (M�DIUM DENSE TO DENSE, MOIST)
(DRIFT)
SAMPLES WERE COLLECTED AT 0.5, 3.5 AN ' D 5.0 FEET
GROUND WATER SEEPAGE WAS NOT ENCOUNTERED
TEST PIT CAVING WAS NOT ENCOUNTEREO.
TEST PIT WAS COMPLETED AT 5.5 FEET 04 06-04-97
TEST PIT SIX
0.0-0.5 SM
DARK BROWN/BLACK SILTY SAND WITH ROOTS (TOPSOIL)
0.5-2.8 SP-SM
BROWN FINE. TO MEDIUM SAND WITH S14T, GRAVEL AND ROOTS (MEDIUM
DENSE, MOIST) (WEATHERED DRIFT)
2.8-5.7 SP/Sm
GRAY FINE TO MEDIUM SAND WITH TRAqE SILT AND GRAVEL, GRADING TO
FINE TO MEDIUM SAND WITH SILT AND. G�AVEL (MEDIUM DENSE To DENSE,
MOIST) (DRIFT)
SAMPLE WAS COLLECTED AT 1.5 FEET
GROUND WATER SEEPAGE WAS NOT ENC UNTERED
TEST PIT CAVING WAS NOT ENCOUNTERE
TEST PIT WAS COMPLETED AT 5.7 FEET O� 06-04-97
TEST PIT SEVEN
0.0-0.4 SM
DARK BROWN/BLACK SILTY SAND WITH RCPTS
(TOPSOIL) JE!LW
0.4-4.3 SM
DARK BROWN SILTY FINE TO MEDIUMf' SAND WITH GRAVEL, PIECES OF
t
ASPHALT AND ROOTS (LOOSE, MOIST) (ELL�)
4.3-5.9 SM
RUSTY BROWN SILTY FINE TO MEDIUM SAND WITH GRAVEL (MEDIUM DENSE,
MOIST) (WEATHERED DRIFT)
5.9-7.0 SP-SM
GRAY -BROWN FINE TO MEDIUM SAND WITH SILT AND GRAVEL (MEDIUM
DENSE, MOIST) (DRIFT)
7.0-8.0 SP/SW
GRAY FINE TO COARSE SAND WITH GRAVrjL (DENSE, MOIST) (OUTWASH)
SAMPLES WERE COLLECTED AT 2.0, 4.5, 6.� AND 8.0 FEET
GROUND WATER SEEPAGE WAS NOT ENC�UNTERED
TEST PIT CAVING WAS NOT ENCOUNTEREP
TEST PIT WAS COMPLETED AT 8.0 FEET ON 06-04-97
LMH:dfr NELSON-CLjUVRETTE &ASSOCIATES, INC.
FILE NO. 210097
FIGURE 5
LOG OF EXPLORATION
DEPTH Usc
SOIL DESCRIPTION
TEST PIT EIGHT
0.0-0.3 SM
DARK BROWN/BLACK SILTY SAND WITH ROJOTS (TOPSOIL)
0.3-1.4 sm
DARK BROWN SILTY SAND WITH GRAVEL *D ROOTS (LOOSE, MOIST) (FILL)
1.4-2.5 SM
RUSTY -BROWN SILTY SAND WITH GRA�EL AND ROOTS (LOOSE, MO . IST)
(WEATHERED DRIFT)
2.5-5.8 SP/SP-SM
GRAY FINE TO MEDIUM SAND WITH TRACEZILT, GRAVEL GRADING TO FINE TO
MEDIUM SAND WITH SILT, GRAVEL (MED[Uill DENSE, MOIST) (DRIFT)
SAMPLES WERE NOT COLLECTED
GROUND WATER SEEPAGE WAS NOT ENC(PUNTERED
TEST PIT CAVING WAS NOT ENCOUNTEREP
TEST PIT WAS COMPLETED AT 5.8 FEET 00,106-04-97
TEST PET NINE
0.0-0.3 SM
DARK BROWN/BLACK SILTY SAND WITH RCbTS (TOPSOIL)
0.3-2.5 SM
BROWN SILTY FINE TO MEDIUM SAND "ITH GRAVEL AND ROOTS (MEDIUM
DENSE, MOIST) (WEATHERED DRIFT)
2.5-4.8 SP/Sm
GRAY FINE TO MEDIUM SAND WITH GPAitEL AND TRACE SILT GRADING TO
SILTY FINE TO MEDIUM SAND WITH GRAVEL (MEDIUM DENSE TO DENSE,
MOIST) (DRIFT)
SAMPLES WERE NOT COLLECTED
GROUND WATER SEEPAGE WAS NOT ENCOUNTERED
TEST PIT CAVING WAS NOT ENCOUNTERED
TEST PIT WAS COMPLETED AT 4.8 FEET O� 06-04-97
TEST PIT TEN
0.0-1.0 sm
DARK BROWN SILTY SAND WITH ROOTS (TOPSOIL)
1.0-2.2 sm
RUST -BROWN SILTY SAND WITH GRA\&L AND ROOTS (LOOSE, MOIST)
(WEATHERED DRIFT)
2.2-6.0 SP
BROWN -GRAY TO GRAY FINE TO MEDIUIO SAND WITH GRAVEL AND TRACE
SILT, AND SILTY SAND LENSES AT 5.5 EET (MEDIUM DENSE TO DENSE,
MOIST) (DRIFT)
SAMPLES WERE COLLECTED AT 1.5 AND 5.P FEET
GROUND WATER SEEPAGE WAS NOT ENCTUNTERED
TEST PIT CAVING WAS NOT ENCOUNTEREP
TEST PIT WAS COMPLETED AT 6.0 FEET ON 06-04-97
LMH:dfr
& ASSOCIATES, INC.
FILE NO. 210097
FIGURE 6
LOG OF EXPLORATION
DEPTH Usc
SOIL DESCRIPTION
TEST PIT ELEVEN
0.0-1.0 sm
DARK BROWN SILTY.SAND WITH GRAVEL, ROOTS, ORGANICS, PIECE OF
ASPHALT (LOOSE, MOIST) (FILL)
1.0-.2.7 SM'
BROWN SILTY FINE TO MEDIUM SAND �MITH GRAVEL, ROOTS (LOOSE TO
MEDIUM DENSE, MOIST) (WEATHERED DR )FT)
2.7-5.5 sm
GRAY SILTY FINE TO MEDIUM SAND V�ITH
GRAVEL, LENSES OF FINE TO
MEDIUM SAND, POCKETS OF FINE TO COARSE
SAND, IRON STAINING FROM 2.7
TO 3.7 FEET (MEDIUM DENSE TO DENSE, I�OIST)
(DRIFT)
5.5-13.0 SP-SM/SW
GRAY FINE TO MEDIUM SAND WITH SILl;' AND GRAVEL TO FINE TO COARSE
SAND WITH GRAVEL WITH TRACE SILTY SAND SEAMS (DENSE TO VERY
DENSE, MOIST) (OUTWASH)
SAMPLES WERE COLLECTED AT 3.0,4.5,81'5, AND 11.0 FEET
SLIGHT GROUND WATER SEEPAGE WAS ONCOUNTERED AT 11.0 FEET
TEST PIT CAVING WAS NOT ENCOUNTEREJ.D
TEST. PIT WAS COMPLETED AT 13.0 FEET ON 07-14-97
TEST PIT TWELVE
0.0-0.6 SM
DARK BROWN SILTY SAND WITH GRAVSL, ROOTS, AND ORGANICS (LOOSE,
MOIST) (TOPSOl
0.6-1.6 Sm
RUST BROWN SILTY FINE TO MEDIUM S�AND WITH GRAVEL, ROOTS(LOOSE,
MOIST) (WEATHERED DRIFT)
1.6-3.6 SP-SM
BROWN -GRAY FINE TO MEDIUM SAND�:WITH SILT AND GRAVEL (MEDIUM
DENSE, MOIST) (DRIFT)
3.6-6.5 SM
GRAY -BROWN TO GRAY SILTY FINE TO MEDIUM SAND WITH GRAVEL,
SCATTERED COBBLES, LENSES OF FIN� TO MEDIUM SAND, IRON STAINING
FROM 3.6 TO 4.6 FEET (DENSE, MOIST) (139IFT)
6.5-11.5 SP/SP-SM
GRAY FINE TO COARSE SAND WITH GRAVEL GRADING TO FINE TO MEDIUM
SAND WITH SILT AND GRAVEL (VERY DENbE, MOIST) (OUTWASH)
SAMPLES WERE COLLECTED AT 2.0,4.0, AIND 8.0 FEET
SLIGHT GROUND WATER SEEPAGE WAS 4NCOUNTERED AT 10.0 FEET
TEST PIT CAVING WAS NOT ENCOUNTEREID
TEST PIT WAS COMPLETED AT 11.5 FEET ON 07-14-97
LMH:dfr
UVRETTE & ASSOCIATES, INC.
FILE NO. 210097
FIGURE 7
CU
C�
CU
0%
CU
CL
219
—0 --L
—0j)-a 0-0—D— C
C
30-
Iry
LA
C21
O�H al
arkin I - �J; am nvAc
24, 1W.
ISPOWT aflow .........
IL CU 10
5
;U
r
MON
z I IT
TV, 2 8 03.90,
10= MOM TP-1 0
TP-7
4� C�
03
TP-9 L
L D
A D G C B JILDI r,
T T W H ME
3 NIT T WNHOM 3 UNI
2 s He 0- 2 storie its
5 paLr statt4e -
-67�(FLAT 2')
a T61 207.
TP-8 I-Sm"
Reference: Site plan created from a drawing titled "208th Street SW Condominiums", dated March 6, 1997 by
Peter Schroeder Architects.
Site Plan
0 40 80
Scale 1" = 40'
LEGEND
TP-1
NUMBER AND APPROXIMATE
LOCATION OF TEST PIT
IT-4
NUMBER AND APPROXIMATE
LOCATION OF INFILTRATION TEST
20�1'H ST�EET S\�.
425 -
+2 +2 �+��2 +2 +2 +1 +1 +1 +2 2 +2 +1 +1 +1 +1 +1 +1 +1 +1
2 +2+2+2 +2+2
2+90 +1 1 + 4 5+5+ + +4 +4 +4 ++ +4 ++ 4 + +3 +3 + + 3+3 +2+
> 4. +1
— - - - - - - - - - - - - - 2 -2 -2 2 -2 —1 11 4-1 4-1
-4 -4 -4 -4 -4 -4 -4 -4 -4 -4 - 4 -5 -5 5 -6 - -6 -7 -7 -7 -7 1
-4 -4' 5 :5
-4 -4 -4 -4 -4 -4 -4 -4 -4 -4 -4 4 -4 -4 4 -4 - IN14 : 5 6 6 -7 �7 -7 -7 -7 -7
-4 -4 -4 4 -4 -4 *12 4 -4 4 -4 -4 4 - 4 -4 -4 4 14 -5 -5 6 7 -2 7
--4 -4 -4 : 4 4 —4 —4 —4 —4 - 4EWL kV:ll -7 -7 -7 K-1
4
--1 3 -3 -3 -3 -3 -3 -3 �-- 4 :: �4- 4 - 4 -4 -4 -4 L765--6 4 -6 -6 -7 -7 -
-3 -3 -3 -3 -3 -3 -3 -3 -3 -3 -3 -3 -3 -3 -3 -3 -3 -3 3 -3 -3 -3 -3 -%-,4 4
��6 :�� j�6 -6 - 6 'i,6 -6 -
-3 -3 -3 -3 -3 -3 3 -3 -3 -3 -3 -3 -3 -3 -3 -3 3 -3 -3 -3 -3 - 1 4 '1 -6 -6 -6 -1
--3 -3 -3 -3 �-2 -2 -3 -3 -3 -3 -3 -3 -3 3 -3 -3 -3 -3 - 3'-' 4 4 S -6 -6 -6 -6 -6
r3 - �3- 2 2 - -3 -3 43 - 6 -6 -
J
-2 2 -2 3 -3 - �-6 =6 f, -6-6
3
2 47J
2 -2 - 2
Z, -2 -2 -2 -F 2
F
2 -2 -2 -2 -2 -2 - -2 - - - - - - - 2 �2 -2 - -2 -2 -2 2 -2 - - - 2
2 2'J2 -2 - -2 2 -2 - 2 - I .. I ` - , -
:2 2 - -2
-2 -2 -2 - -2 - -2 - 2 -2 -2 -2 -2 -2 - -2 :2 1 - 72- 2 2 -
-2 -2 -2 -2 - -2 2 2 -2 -2 -2 -
2 2 2 -2 -2 -2 -2 - 2 - 2 -2
2 - -2 2 -12 - -2 - 1 -2 2 - - I -
2 - -1 _1 -1 -1 -1 -1 -1 - 1 -1 -1
+1 +/+,
+
F+F 41 0
+1 +1 +1 1 +1 1 11
I I . +1 +111++: +� ++� I
+1 1 +1 +1 tL±� +1 1 +1 — — —
+41 1 +1 +1 +1 +1 +1 —+1 .— 1 +1
+ +1 +
�tL-A-� 418
+1 +1 +1 +1 +1 +1 +1 1 +1 +1 +1
I I 1 +1 +1 +1 +1 +1 +1 1 +1 +1 +1 +1
1 2 +2 +2 +2+2 +1 +1 +1 +1 +1 +1
+2 +2 + +1 +1 1 +1 +1 +1
+ +2 +2 +21.2+2 +2 1 +1 +1 +1
+11 1 +1 +1 +1
+1 + +1 +1
+:
,2 %2,+l +1 +1 +1
+1 + +1 417
1 +11111 1 1 +1 +1 +1 +1 +1 +1 1 +1
I + +1 1 +1 +1 1 +1 +1 0 +1 +1 +1 +1 +1 +1 +1 T, +1 +1
1 +1 + +1 +1 +1 + +1 +1 je+1 1 +1 %� ------ � 1 +1 +-17-1+7:1�-
1 +1 +1 +� -+-1 +1 1 +1 2 +2 1 +1 +1 +1 +1 +1\ +1 +1 +1 +1 +1 +1 +1 +1 +1 +1 +1 +1 +1 +1 +1 +1 +1 +1
1 +1 +1 +1 +1 +1 1 +1 -+1 +1 +1 +1 +1 +1 +1 +1 +1 1 + +1 +1 +1 +1 +1 +1 +1 +1 fl -R-+I-R +1 +1
+ +2 +2 +2 2 +1 - �V+l +1 +1 +1 1 +
+� +1 +1 + +1
+2 2 +2 +2 + +2 +1 +2 +2 + +2 +1 +1 1 +1 +1 4-1 +1 +1 + I I 1 +1 +1 +
1 +2 2 +2 +2 +1 1 +1 + +2 +2 1
1 2 2 +2 +2 +2 ILD 2 +:'� +12 ++Il ++ ++il +1 1 ++11 ++11 ++Il ++ 11 t�W +1 +1
+ 2 -V2 +2 �41§ -Z$ +2+ + +2 :2 +1 + +I, il 1 +1 +1 +1 +1 +1 +1 V ti tbts +1 11 +1 +1 +1
+ .1 �l I 1 +1 +1 +1 +1 +1 s.R+l
+2 442 +2 +2 +2 +2+2 +2 +2 +2 +2 �P+2 + + �l +1 +1 +1 +1 IFI+l -H
* +3+3+2 2 +2 +2 2 + -�+3 +2 +2 -d�+'2 +2' + I + +I +1,+� Wlw+oolD+I,rl +I
* 4-3 +3 +2+ +2 1� I I + ljll� L 1 +1 4441.3+1 1
+ +2 2 2 + +2 +2 +1 +1 +1 1 1 ±1 1 1 ±3 ±1 ±1 ±1 ±1 t� ffEl I
417-,
0+00
,.?4 ----
0+05
420 -
416
0
0+00
420
416
412
20 40 60 so 100 120 140 160 ISO 200 220
412
0 20 40 60 80 100 120 140 160 180 200 220
SCALE: H I"=40' LEGEND: EXISTING GROUND
V I "= 4' PROPOSED GROUD
0
0+15
420 �
416
412
0+10
420 -
416
412 L
0
420
416
412
20 40 60 80 100 120 140 160 190 200 220
420
416
412
20 40 60 80 100 120 140 160 180 200 220
SCALE: H I"=40' LEGEND: EXISTING GROUND
V I"= 4' PROPOSED GROUD
0
0+25
420 r-
416
412
0+20
420 -
416
412 L
0
420
416
I I I I I I 1 1 412
20 40 60 so too 120 140 160 180 200 220
20 40 60 80 too 120 140 160 180 200 220
SCALE: H 1"=40' LEGEND: EXISTING GROUND
V 1 "= 4' PROPOSED GROUD
420
416
412
0
0+35
420 �
415
w
0+30
420 —
416
420
415
412
20 40 60 80 100 120 140 160 iso 200 220
412 ' I I I
0 20
SCALE: H I"=40'
VI"= 4'
40 60 80 100 120 140 150 180 200 22C
LEGEND: EXISTING GROUND
PROPOSED GROUD
420
416
412
0+45
420 �
416
0 20 40 60 80 100 120 140 160 180 200 220
0+40
420 �
416
412 '
0 20
SCALE: H I"=40'
V 1"= 4'
40
420
416
420
415
412
60 80 100 120 140 160 180 200 220
LEGEND: EXISTING GROUND
PROPOSED GROUD
16
0+55
420 �
416
0 20 40 60 80 100 120 140 160 ISO 200 220
0+50
420 -
416
0 20 40 60 80 100 120 140 160 180 200 220
SCALE: H I"=40'
LEGEND: EXISTING
GROUND
V 1"=
4'
PROPOSED
GROUD
420
416
420
416
0+65
420 -
416
0 20 40 60 80 100 120 140 160 180 200 221
0+60
420 -
416
0 20 40 60 80 100 120 140 160 180 200 22(
SCALE: H I"=40' LEGEND: EXISTING GROUND
V I"= 4' PROPOSED GROUD
420
416
420
416
0+75
420 -
416
0 20 4D 6D 80 100 120 140 160 180 200 22(
0+70
420 -
416
0 20 40 60 80 too 120 140 160 180 200 22(
SCALE: H 1"=40' LEGEND: EXISTING GROUND
V 1"= 4' PROPOSED GROUD
420
416
420
416
0
0+85
420 �
416
0 20 40 60 80 100 120 140 160 180 200 22(
0+80
420 �
416
0 20 40 60 so 100 120 140 160 ISO 200 22C
SCALE: H I"=40' LEGEND: EXISTING GROUND
V I "= 4' PROPOSED GROUD
420
416
420
416
0
0+95
420 —
416
0 20 40 60 80 i0o 120 140 160 180 200 220
0+90
420 —
416
0 20 40 60 80 100 120 140 160 180 200 220
SCALE: H I"=40' LEGEND: EXISTING GROUND
V I "= 4' PROPOSED GROUD
420
416
420
416
Ll
1+10
420 —
416
420
416
20 40 60 80 100 120 140 160 180 200 2 20
0
1+05
420 —
416
1+00
420 —
416 L
0
420
416
20 40 60 80 100 120 140 160 iso 200 2 20
420
I ' 411
40 W M Wo 120 140 160 180 2� 212.
SCALE: H I"=40' LEGEND: EXISTING GROUND
V I"= 4' PROPOSED GROUD
1+25
420 -
416
1+20
420 F_
416
14-15
420 -
416 L
0
420
I I I ' 411
20 40 60 80 100 120 140 160 180 200 220
420
411
20 40 60 80 100 120 140 160 180 200 220
420
411
20 40 60 80 100 120 140 160 1 80 200 220
SCALE: H I"=40' LEGEND: EXISTING GROUND
V I "= 4' PROPOSED GROUD
1+40
420 �
416 L
0
1+35
420 r-
416
1+30
420 —
416 L
0
420
-L L -L 'L- ' I -'- ' i I ' "'
20 Q SO SO 1. 120 141 ISO 11 2. 220
420
I I I I I I I I I I I I I I I I I I I I ' 416
20 40 60 80 100 120 140 iso ISO 2DO 220
420
I ' 411
20 Q 611 SO I� 1 '20 1 �10 160 2� '20
SCALE: H I"=40' LEGEND: EXISTING GROUND
V I"= 4' PROPOSED GROUD
0 �
1+55
420 -
0 20 40 60 80 100 120 140 160 180 200 22C
1+50
420 -
0 20 40 60 80 100 120 140 160 180 200 22C
1+45
420 �
0 20 40 60 80 100 120 140 160 180 700 22C
SCALE: H 1"=40' LEGEND: EXISTING GROUND
V I"= 4' PROPOSED GROUD
420
420
420
1+70
420
0 20 40 60 80 1DO 120 140 160 ISO 200 22(
1+65
420 r--
0 20 40 60 80 IDO 120 140 160 180 2DO 22(
1+60
420 -
0 20 40 60 80 100 120 140 160 180 200 22(
SCALE: H I"=40' LEGEND: EXISTING GROUND
V I"= 4' PROPOSED GROUD
420
420
420
0
1+80
420
IM
1+75
420
a
420
I I I I I I I I I I I ' 416
20 40 60 80 100 120 140 160 180 200 220
420
I I I I I I I I I I I I I I I 1 1 416
20 40 60 w 100 120 140 160 180 20D 220
SCALE: H 1"=40' LEGEND: EXISTING GROUND
V 1"= 4' PROPOSED GROUD
�m
110111
420
420
0
416
11 20 40 60 80 100 120 140 160 180 2DO 220
06151
420
416
420
416 ' I I I I I I I I I I I I I I I I I I I I I . 416
0 20 40 60 80 100 120 140 160 180 200 220
SCALE: H I"=40' LEGEND: EXISTING GROUND
V I"= 4' PROPOSED GROUD
2+00
424 -
420
416
Moll
420
424
420
416
20 40 60 80 100 120 140 160 180 200 220
420
416 ' I I I I I I I I I I I I I I I I I I I I ' 411
0 20 Q 60 80 100 120 140 160 180 200 2M
SCALE: H I"=40' LEGEND: EXISTING GROUND
V I"= 4' PROPOSED GROUD
0
(9
2+10
424 -
420
416 '
0
2+05
424 -
420
416 L
0
424
420
I I I I I I I I I I 1 416
20 40 60 80 100 120 140 160 180 200 220
424
420
I I I I I I I I I I I I I I I I ' 411
20 40 60 80 100 120 140 160 100 200 2M
SCALE: H 1"=40' LEGEND: EXISTING GROUND
V I"= 4' PROPOSED GROUD
2+20
424 r--
420
416 L
0
2+15
424 -
420
416 L
0
424
420
I I I I I I I I I I I I I I I I I I I ' 416
20 40 60 so 100 120 140 160 ISO 200 220
424
420
I I I I I I I I I I I I I ' 416
20 40 60 80 100 120 140 160 180 200 2;0
SCALE: H 1"=40' LEGEND: EXISTING GROUND
V, I"= 4' PROPOSED GROUD
0
2+30
424 �
420
416
2+25
424 —
420
416
424
420
416
20 40 60 so 100 120 140 160 180 200 220
424
420
1 416
20 40 60 80 100 120 140 160 180 200 220
SCALE: H 1"=40' LEGEND: EXISTING GROUND
V I "= 4' PROPOSED GROUD
0
*I
2440
424
420
m
2+35
�zm
420
424
420
416
20 40 60 80 100 120 140 160 iso 200 220
416
0 20 40
SCALE: H 1"=40'
V I"= 4'
60 80 100 120 140 160 180 200 220
LEGEND: EXISTING GROUND
PROPOSED GROUD
424
420
415
IF-]
L
2+50
424
420
416 L
0
2+45
424
420
416 �
0
SCALE: H 1"=40'
VI "= 4'
424
420
I I I I I I I I I I I I I I I I I I I I ' 411
20 40 60 80 100 120 140 160 180 200 220
20 40 60 so 100 120 140 160 180 200 22(
LEGEND: EXISTING GROUND
PROPOSED GROUD
424
420
416
0
0
2+60
424
420
416
2+55
424
420
4?4
420
416
20 40 60 80 100 120 140 160 180 200 2K
416 ' I I I I I I I I I I I I I I I I I
0 20 40 60 80 100 120 140 160 M 2 720
SCALE: H I"=40' LEGEND: EXISTING GROUND
V I"= 4' PROPOSED GROUD
424
420
416
0 ii
2+70
424
420
416 L
0
2+65
424
420
424
420
1 1 416
20 40 60 80 1 DO 1 20 140 160 lw 200 220
416 ' I I I I I I I I I I I I I I I I I
0 20 40 60 80 100 120 140 160 150 200 220
SCALE: H 1"=40' LEGEND: EXISTING GROUND
V I"= 4' PROPOSED GROUD
424
420
416
�lm
2+75
428
424
420
416
0 20 40 60 80 IDO 120 140 160 180 200 220
SCALE: H 1"=40' LEGEND: EXISTING GROUND
V I"= 4' PROPOSED GROUD
428
0
In
420
416 10
2+8�
428 F-
424
420 L
0
2+80
428 —
424
420
428
424
I I L I I ' 420
20 40 60 80 100 40 1. 1160 1 '80 200 220
0 20 40 &0 so 100 120 140 160 180 200 22(
SCALE: H I"=40' LEGEND: EXiSTING GROUND
V 1"= 4' PROPOSED GROUD
428
424
420
0
2+ 95
424
424
0
420 L
0
2+90
428 -
I I I I I I I I I I I I I I I I I ' 420
20 40 60 80 100 120 140 160 180 200 220
428
0
424
420 '
0
424
I I ' 420
20 40 60 80 100 120 140 160 180 200 220
SCALE: H I"=40' LEGEND: EXISTING GROUND
V V= 4' PROPOSED CROUD
vt SC;SjVE:0 -
j A% 7 199a
Tumberry Lane Condominiums
208'h Street Southwest & 7Vd Avenue West
EDMONDS, WASHINGTON
S TORM WA TER MA NA GEMEN T REPOR T
Tq (rV f )LA
�, 0 1 � G A(,rej
-1
�. 3 -? )
e7S k)
Prepared by.
Washington Land Design
9709 Third Avenue N.E., Suite 203
Seattle, Washington 98115
(206) 522-9510
FAX. (206) 522-8344
FE-XP1 RES _7/7/-tq j
July 18,1997
Revised October 28, 1997
Revised December 1Z 1997
Revised December 29, 1997
Revised Januaty 23, 1998
(,Ic f*r
50;10
6. JA
ep�
*V I �Jqs
14
TABLE OF CONTENTS.
VicinityMap ...................................................................................................................... 1
ProjectNarrative ............................................................................................................... 2
Project Description
Existing Conditions
Proposed Storm Sewer System
Stormwater Detention
Stormwater Quality
Conveyance
ExistingConditions Map .................................................................................................. 5
ProposedCondition Map ................................................................................................. 7
Stormwater Runoff Hydrographs ...................................................................................... 9
1 0-Year, 24 Hour Design Storm
1 00-Year, 24 Hour Design Storm
Flow Control Structure Calculations .............................................................................. 16
1 0-Year, 24 Hour Design Storm
1 00-year, 24 hour Design Storm
Stormwater Conveyance Calculations ........................................................................... 22
FlowControl Detail ........................................................................................................ 24
Coalescing Plate'Structure Detail ....................................... I ........................................... 26
CurveNumber Calculations ............................................................................................ 28
Time of Concentration Calculations ............................................................................... 30
Tumberry Lane Condominiums
July 18, 1997
Revised January 23, 1998
Bwt), Af ptly -I WY ILL PAti—
I R, I _ANLI-11 CDs zt5j
98;
.4 ; I . . - r.
J99Ttt
BRAc" 11 'CASP T ST w I I'AlRb"V 'I.. X�- l!'10JI (A
iAWIAL
81,44 H
VI 11� — ... .1, 'J"', WY
-iA 11 R W, P: w NV r*1 11 cotwif
M714 -
20-11�f)
A"' %if RRA 20 No 40
1; I'lo;
?021
Ca"MI Ty 9
G, i N ; " T i , ! , *
ST w w v
f 11W
—oA COLLEGE i
J�Al I Y ?wRo ST w
sl
2."
D110
SW5-
w
t];t %W
'IR
C
PLA rf it 11
i4v
pu 7, ME
RIDW
4 ?eo MIT ;o I �01 PK
FK KkLO Mid UR L fW PLArf CIII
0
MAI N ST 01,11 ST i sw I RIVIAG RAWA
PO
r4
DAYTON, ST- L :!"41 PL .�W
KAPLI
YOS r
; 209fH pt
ST -V
f... - V, 6 ,
M90RIAL iE sw
L
SW
ALM14 PAW W. T), ST SW ?Joj)j I
Sw
.7 WAt Kjl:
x . .1 1 : . PK:
211rjj sl w
UDI 21 1 f :�,,
21 H ' I .
M N ?I'll 91, "1 ST sw 2VIV
HOWM WY
oly
SW
Ru
xf RK
op :x PARK
Ty 713TH 713TH PL
-r: :fTfi L 91'PL
IS '2141H pt "L RIDE x: 214m: V. --,i SiT I,- W
Are,
x:;.. 7 st 2; It.
Sw I
'15 w. 51
A ST
?161H S.. a ST '8
P, 161 ST sw
- - 216TV�< ST
w
?171H f
Aj
"j.
sw
'W
/ " " * ,
.W
s . 7 . 10
Lim sl
&:
I? Til ST sw
w
,*jI T C 2a I H 220TH
sr
sw
I I 7K�.
51.
PROJECT NARRATIVE
PROJECT DESCRIPTION
The proposed project is on a 1.20 acre parcel to be redeveloped into a condominium
complex. This project consists of the construction of four two-story buildings, parking,
landscaping, stormwater conveyance/detent ion, utility improvements, and site grading
to accommodate these improvements. The three existing on -site buildings (3,560 SF,
1202 SF, and 1,061 SF in area) will be demolished to accommodate the proposed
development.
The stormwater quantity and quality management system for the project has been
designed in accordance with applicable requirements of the Washington State
Department of Ecology Stormwater Manual and the City of Edmo . nds Storm Drainage
Ordinances.
EXISTING CONDITIONS
The site is located adjacent to the northwestern corner of the intersection of 208 th
Street SW and 72 nd Avenue W. On the existing site is a small private school. The
overall site topography slopes from the northeastern portion of the property to the
southwestern portion. The existing grades vary between 427 feet and 413 feet above
mean sea level. 'Refer to the attached sketch of the existing site conditions.
PROPOSED STORM SEWER SYSTEM
Stormwater quality and quantity management has been designed in accordance with
applicable requirements of the Washington State Department of Ecology Stormwater
Manual. all to) fcvlovl
The proposed stormwater management system is designed to detain and treat the
stormwater runoff for the areas subject to vehicular traffic. The detention system will
consist of an underground detention pipe and a flow control structure which is to be
located in the southeastern portion of the property. Detention of the increase in runoff
due to the development of the site is addressed in the Stormwater Quality and
Stormwater Detention sections of this report.
The conveyance calculations for the storm system have been based upon the 25-year
design storm as calculated using the SCS method as implemented in Waterworks
software by Engenious Systems, Inc. The proposed drainage system is composed of
curb and gutter, catch basins, and underground storm drainage pipe.
0�1
Turnberry Lane Condominiums
July 18,1997
Revised January 23, 1998
S TORMWA TER DETENTION
Stormwater. runoff will be detained and released at or below the pre -developed runoff rates
Runoff will be conveyed through an oil/water separator and then into the proposed extension
of the public storm drainage system in 72nd Avenue W.
DETENTION
The stormwater runoff is conveyed to the on -site underground detention pipe. The
stormwater detention system has been designed to provide detention for the peak runoff for
the 10 and 1 00-year, 24 hour storm events based upon the SCS methodology as directed by
the City of Edmonds. Curve numbers used in determining the design storms have been.
based upon available soils information.
The pre -developed (existing) 1 0-year and 1 00-year, 24 hour discharges for the entire site
are 0.24 cfs and 0.49 cfs respectively. The detention calculations for the stormwater
management system have been based upon the SCS method as implemented in Waterworks
software by Engenious Systems, Inc., and are provided in the Appendix. The table below
summarizes the detention analysis.
Pervious Area 0.34 AC
Impervious Area 0.86 AC
Existing 10yr peak flow 0.24 cfs;
Existing 100yr peak flow 0.49cfs
Proposed 1 Oyr peak flow* 0.47 cfs
Proposed 1 00yr peak flow* 0.75 cfs
*Proposed peak flow before detention
STORMWATER QUALITY
OILIWATER SEPARATION
The stormwater runoff which is subject to vehicular shall be treated after it has been
detained. Although other BMP's for water quality are preferred, an oil/water separator
was selected due to space constraints. The oil/water separator has been sized to treat
the 1 0-year, 24 hour storm.
3
Turnberry Lane Condominiums
July 18, 1997
Revised January 23, 1998
Existing Conditions Map
L
-j
Fj
n::
IT
LL
n,
own 31A -
f T-1
All
No
(;HAPHIC SCAl E
!;AiL P
lUming I fngin�. nng 208th STREET CONDOMINIUMS
4 EDMONDS. WASHINGT�
EXISTING CONDITIONS
Proposed Condition Basin Map
Turnberry Lane Condominiums
July 18, 1997
Revised December 29,1997
BASIS OF =G
--4
208TH' S.W.
BUILDING
III
30 SIALIS IOIA4
NX(
o=
T7
F
BUILDWO
3 WE 101114m
2 STORIES
5 P�pc STATES
30*
Z4
EPA.
DF95NED BY: IM DATE:
.IT Lwashington Land D-isn
L
lik—Awfoy. Awning EnSineering TURNBERRY LANE CONDOMINI
EDMOND
IN F;RUCI NO MET Tt*dA— ME-.*ft S. WASHNGTON PROPOSED CONDMONS
a I r.1.10 81. 5.* WA9111141
fZCWS22-"10 f7AXOMSU-M"
Stormwater Runoff Hydrographs
Tim in Hours
Hyd
No.:
28
Rate:
0.25
cfs
Time:
8.33
hr
Vol
0.08
Ac-ft
Int:
10.00
min
Hyd
No.:
28
Rate:
0.29
cfs
Time:
8.50
hr
Vol
0.11
Ac-ft
Int:
10.00
min
Hyd
No.:
28
RaLe:
0.43
cfs
Time:
8.33
hr
Vol
0.15
Ac-ft
Int:
10.0'0
min
Hyd
No.:
28
Rate:
0.17
cfs
Time:
8.33
hr
Vol :
0.06
Ac-ft
Int:
10.00
min
Time in hours
Hyd
No- :-
2 8
Rate:
Vol
Hyd
No.:
2 8
Rate:
Vol
Hyd
No.:
28
Rate:
Vol
Hyd
No.:
28
Rate:
Vol :
0.39
cfs
Time:.
8.17
hr
0.13
Ac-ft
Int:
10.00
min
0.55
cfs
Time:
8.50
hr
0.19
Ac-ft
Int:
10.00
min
0.70
cfs
Time:
8.17
hr
0.24
Ac-ft*
Int:
10-00
min
0.30
cfs
Time:
8.33
hr
0�11
Ac-ft
Int:
10.00
min
1/23/98 page I
Turnberry Lane Condominiums
Edmonds, Washington
BASIN SUM?vLARY
P'E
BASIN ID: 100YRDTN NAME: 100 YEAR 9@q4VRf@EP
SCSMETHODOLOGY
TOTAL AREA ....... : 1.20 Acres BASEFLOWS: 0.00 cfs
RAINFALL TYPE .... TYPEIA PERV HVIP
PRECIPITATION .... : 3.00inches AREA..: 0.34Acres 0.86Acres
TIME INTERVAL .... 10.00 min CN .... : 92.00 98.00
TC .... : 5.00 min 5.00 min
ABSTRACTION COEFF: 0.20
TcReach - Shallow L: 50.00 ks: 11.00 s:0.0500
impTcReach - Sheet L: 115.00 ns:0.0 110 p2yr: 1.50 s:0.0005
PEAK RATE: 0.75 cfs VOL: 0.25 Ac-ft TIME: 490 min
BASINID:100YREX NAME: 100 YEAR E)(ISTING STORM
SCS METHODOLOGY
TOTAL AREA ....... : 1.20 Acres BASEFLOWS: 0.00 cfs
RAINFALL TYPE .... TYPEIA PERV RVIP
PRECIPITATION .... : 3.00inches AREA..: 1.04Acres 0.16Acres
TIME INTERVAL .... 10.00 min CN .... : 86.00 98.00
TC .... : 12.89 min 5.00 min
ABSTRACTION COEFF: 0.20
TcReach - Sheet L: 300.00 ns:0.0600 p2yr: 1.50 s:0.0400
TcReach - Shallow L: 50.00 ks: 11.00 s:0.0500
impTcReach -Sheet L: 115.00 ns:0.01 10 p2yr: 1.50 s:0.0005
PEAK RATE: 0.49 ds VOL: 0. 17 Ac-ft TIME: 5 10 min
1/23/98 page 2
' Turnberry Lane Condominiums
Edmonds, Washington
BASIN SUMIVIARY
OFEVA"Mv
BASIN ID: IOYRDTN NAME: 10 YEAR DSW66WE49-
SCS METHODOLOGY
TOTAL AREA ....... : 1.20 Acres BASEFLOWS: 0.00 cfs 100e
RAINFALL TYPE .... TYPE I A PERV UVEP
PRECIPITATION .... : 2.00 inches AREA..: 0.34 Acres 0.86 Acres
TIME INTERVAL .... 10.00 min CN .... : 92.00 98.00
TC .... : 5.00 min. 5.00 min
ABSTRACTION COEFF: 0.20
TcReach - Shallow L: 50.00 ks: 11.00 s:0.0500
impTcReach - Sheet L: 115.00 ns:0.01 10 p2yr: 1.50 s:0.0005
PEAK RATE: 0.47 cfs VOL: 0. 16 Ac-ft TIME: 500 min
BASIN ID: 10YREX NAME: 10 YEAR EXISTING STORM
SCS METHODOLOGY
TOTAL AREA ....... : 1.20 Acres BASEFLOWS: 0.00 cfs
RAINFALL TYPE .... TYPE I A PERV RVIP
PRECIPITATION .... : 2.00inches AREA..: 1.04Acres 0.16Acres
TIME INTERVAL .... 10.00 n-dn CN .... : 86.00 98.00
TC .... : 12.89 min 5.00 min
ABSTRACTION COEFF: 0.20
TcReach - Sheet L: 300.00 ns:0.0600 p2yr: 1.50 s:0.0400
TcReach - Shallow L: 50.00 ks: 11.00 s:0.0500
impTcReach -Sheet L: 115.00 ns:0.01 10 p2yr: 1.50 s:0.0005
PEAK RATE: 0.24 cfs VOL: 0.09 Ac-ft TIMIE: 510 min
Flow Control Structure Calculations
1/23/98 page 5
Tumberry Lane Condominiums
Edmonds, Washington'
STAGE DISCHARGE TABLE
MULTIPLE ORIFICE ID No. ORIFICE
Description: ORIFICE
Outlet Elev: 411.80 le
Elev: 409.80 ft Orifice Diameter: 2.3400 in.
Elev: 414.50 ft' Orifice 2 Diameter: 2.2500 in. to
STAGE <--DISCHARGE --- > STAGE <--DISCHARGE --- > STAGE <--DISCHARGE --- > STAGE <--DISCHARGE
(ft) --- cfs -- ------- (ft) --- cfs -- ------- (ft) --- cfs -- ------- (ft) --- cfs -- ------- *
411.80
0.0000
413.10
0.1694
414.40
0.2396
415.70
0.4439
411.90
0.0470
413.20
0.1758
414.50
0.2442
415.80
0.4538
412.00
0.0665
413.30
0.1820
414.60
0.2921
415.90
0.4634
412.10
0.0814
413.40
0.1880
414.70
0.3145
416.00
0.4728
412.20
0.0940
413.50
0.1937
414.80
0.3326
416.10
0.4819 0000"
412.30
0.1051
413.60
0.1994
414.90
0.3485
416.20
0.4908
412.40
0.1151
413.70
0.2048
415.00
0.3630
416.30
0.4995
412.50
0.1243
413.80
0.2101
415.10
0.3763
416.40
0.5081
412.60
0.1329
413.90
0.2153
415.20
0.3889
416.50
0.5164
412.70
0.1410
414.00
0.2204
415.30
0.4009
416.60
0.5246
412.80
0.1486
414.10
0.2254
415.40
0.4123
416.70
0.5j27
412.90
0.1558
414.20
0.2302
415.50
0.4232
416.80
'0.5406
413.00
0.1628
414.30
0.2349
415.60
0.4337
1/23/98 page 7
Turnberry Lane Condominiums
Edmonds, Washington
LEVEL POOL TABLE SUMMARY
MATCH INFLOW -STO- -DIS- <-PEAK-> STORAGE
< -------- DESCRIPTION --------- > (cfs) (cfs) --id- --id- <-STAGE> id VOL (cf)
10 YR ........................ 0.24 0.47 PIPE FLCTRSTR 414.49J 613.77 cf
100 YR ....................... 0.49 0.75 PIPE FLCTRSTR 416.22 2 1046.16 cf
wMMMMMMO
1/23/98 page 4
Turnberry Lane Condominiums
Edmonds, Washington
STAGE DISCHARGE TABLE
CONIBINATION DISCHARGE ID No. FLCTRSTR
Description: FLOW CONTROL STRUCTURE
Structure: OPHICE Structure:
Structure: WEIR Structure:
Structure:
STAGE <--DISCHARGE --- > STAGE <--DISCHARGE --- > STAGE <--DISCHARGE --- > STAGE <--DISCHARGE >
(ft) --- cfs -- ------- (ft) --- efs -- ------- (ft) --- cfs -- ------- (ft) --- cfs -- -------
411.80 0.0000 411.90 0.0470 -412.00 0,0665 412.00 0.0665
1/23/98 page 6
Turnberry Lane Condominiums
Edmonds, Washington't
STAGE DISCHARGE TABLE
BROAD CRESTED WEIR ID No. WEIR
Description: OVERFLOW WEIR
cd: 3.2 100 Weir. length: 1.0000 ft.
El: 416.75 ft, Weir Increm: 0. 10
STAGE <--DISCHARGE --- > STAGE <--D1SCHARGE---> STAGE <--DISCHARGE --- > STAGE <--DISCHARGE >
(ft) ---cfs-- --* ----- (ft) --- cfs -- ------- (ft) --- cfs --- ------- (ft) --- cfs -- -------
416.75 0.0000 416.80 0.0402 416.80 0.0402 416.80 0.0402
1/23/98 page 3
Turnberry Lane Condominiums
Edmonds, Washington "
------------- : ---------
STAGE STORAGE TABLE
UNDERGROUND PIPE ID No. PIPE
Description: DETENTION PEPE
Diameter: 5.00 ft. Length: 57.00 ft.
Slope ... : 0.0000 ft/ft upstr: dnstr:
STAGE < ---- STORAGE--> STAGE < ---- STORAGE ---- > STAGE< ---- STORAGE ---- > STAGE <---STORAGE >
(ft) --- cf--- --Ac-Ft- (ft) --- cf --- -- Ac-Ft- (ft) --- cf--- --Ac-Ft- (ft) --- cf--- --Ac-Ft-
411.80
0.0000 0.0000
413.10
231.23 0.0053
414.40
588.09 0.0135
415.70
936.63 0.0215
411.90
5.3417 0.0001
413.20
256.53 0.0059
414.50
616.54 0.0142
415.80
959.84 0.0220
412.00
15.016 0.0003
413.30
282.39 0.0065
414.60
644.89 0.0148
415.90
982.20 0.0225
412.10
27.416 0.0006
413.40
308.75 0.0071
414.70
673.11 0.0155
416.00
1004 0.0230
412.20
41.945 0.0010
413.50
335.55 0.0077
414.80
701.14 0.0161
416.10
1024 0.0235
412.30
58.247 0.0013
413.60
362.73 0.0083
414.90
728.94 0.0167
416.20
1043 0.0239
412.40
76.074 0.0017
413.70
390.25 0.0090
415.00
756.46 0.0174
416.30
1061 0.0244
412.50
95.237 0.0022
413.80
418.05 0.0096
415.10
783.64 0.0180
416.40
1077 0.0247
412.60
115.59 0.0027
413.90
446.08 0.0102
41�.20
810.44 0.0186
416.50
1092 0.0251
412.70
136.99 0.0031
414.00
474.30 0.0109
415.30
836.80 0.0192
416.60
1104 0.0253
412.80
159.35 0.0037
414.10
502.66 0.0115
415.40
862.66 0.0198
416.70
1114 0.0256
412.90
182.56 0.0042
414.20
531.10 0.0122
415.50
887.97 0.0204
416.80
1119 0.0257
413.00
206.55 0.0047
414.30
559.60 0.0128
415.60
912.65 0.0210
Stormwater Conveyance Calculation
Turnberry Lane Condominiums
July 18, 1997
Revised December 29,1997
If
I
Washington Land Design
Planning 0 Engineering
Project:
Description:
C40
Az --.,,ve-yA'4C'w
A Ilf 14 522
I -IL- rp_ .4
0 - C), <?F —,
Da te: —7, //Y/'? 7
B Y: I-IFX—
10700 Meridian Avenue North, Suite 5*03, Seattle, Washington 98133 (206) 365-9510 Fax: (206) 365-0225
Flow Control Structure Detail
Turnbe— Lane Condominiums
14
SOLID COVER
RIM EL 418.0'
2 � TYPE 2, 54" 0
3
CATCH BASIN
STEPS OR
LADDER
CASKET (TYP.)
SHEAR CATE
36"0 IN
IE = 411,80__,,--
SLEEVE COUPLING
NON -SHRINK GROUT
WELDED STEEL PLATE W/
2.35" DIA. ORIFICE (#l)
TOP OF RISER
416.8
2-GALV.STEEL
STRAPS
2.35" DIA. ORIFICE (#2)
ELY= 414.50
-TURNED ELBOW)
(WITH DOWN
18" RISER
12"MAX.
13 " M I N.
12"0 OUT
IE OUT
411.80
FLEXIBLE
ADAPTER
COUPLING
2-CALV.STEEL
STRAPS (TOP
AND BOTTOM)
54" 0
FLOW CONTROL STRUCTURE
SCALE I"=2'
Coalesing Plate Structure Detail
Turnberry Lane Condominiums
660-CPS
OIL / WATER SEPARATOR
798 SO. FT. - EFFECTIVE COALESCING AREA
415 G.P.M. - MAXIMUM PROCESS FLOW
COVER 4'-8"
No. 64-2-342P
1,200 lbs. 7'717--- 6,_8*
_T-T-�T!7-71 7:-1
--------- - -
-1-171
- --- - - - - - - - - - - -
- - - - - - - - - - -
OUTLET PIPE
WITH SAMPLING TEE
BY OTHERS �7
BASE ASSEMBLY
No. 660-CPS
6.300 lbs.
OUTLET WEIR
OIL RETAINING BAFFLE
6-01,
FIBERGLASS
HOLD-DOWN CHANNEL
j,_
iNLET P�PE
H ELBow
BY OTHERS
5'-6"
COALESING MEDIA-`
INLET WEIR
0
Copyright 1992
123
ITEMS SHOWN ARE SUBJECT TO CHANGE
WITHOUT NOTICE.
FOR DETAILS SEE REVERSE SIDE.
Issue: Aoril. 1992
U
Washington Land Design
Planning *Engineering
Project: Date:
k14
Description: ,5� ',14 - By: WXg=
^482_
VAF
7015
LAM 5 X 7 -ZOOVS IfAIMO 5-.=5
A -
sww- 'Q-'w-;5b =-'J
7Z.,--ra A'A.--4 A47r =-J--i- "XL=-P
T- UAne A"
-rMe 5XIM 7->V -QveT-x-,i
XS UV4�L�
)VW�e.M- A G;4WVA4C> �4,QTMq- 7*"ZL--
);;;4 7&4--- 6��Y or wpm
E-7,ezro-rr,-14 6-W>-X-7�d "3;V4e- V6 YOVAZ
7,j& 5�ra
AlA.:5- A=5W AA144 VaCO AS XMC�IAI-b --4&WTW
&Iallar
AAIIYZVb Af A- C7FE�J
44wo2v-AP-MIC Aw
the
IVA -
uotj - on
10700 Meridian Avenue North, Suite 503, Seattle, Wa's7iington %NS f33 (206) 365-9510 Fax: (206) 365-0225
*7'
STORMWATER MANAGEMENT MANUAL FOR THE PUGET SOUND BASIN
Soil Type
Hydrologgic Sail
Group
Soil Type
Hydrologic Soil
Group
--i
Newball:
B
spanaway
AIB
Nisqually
8
Sprinedde
Nookawk
C
sulsavar
Norm
CID
Sultan
C
Opny
C
Sullen Variant
B
01"
ND
sualas
C
Okwun"
C
swanown
ND
OIYWVW*
B
TWO100
D
Ore"
D
Taawaz
ND
Orklia
D
T"lwbh
ND
Orting
ND
Tenino
C
090
C
Tisch
D
ovall
C
Tokul
ND
P"Q
C
Townsend
C
Pbeeney
C
Triton
ND
Pbelan
ND
Tukwila
D
Pilchuck
C
Tukay
ND
PM 1,'
C
Urban
variable
Poulsbo
C
Vaime
8
Prather
C
vwkx
C
pus"
D
wepaw
ND
Puyallup
B
Warden
B
ND
Wbk%ey
ND
Quil"no
ND
Wilkeson
8
Rapar
B
W611000
A
Rainier
C
Woodinville
B
Raugla
B
Y"
C
Raw
ND
Zynbar
B
Hydrologic Soil Group Classifications
A. (Low runoff potential). Soils having high infiltration rates, even when
thoroughly wetted, and consisting chiefly of deep, well -to -excessively drained
sands or gravels. These soils have a high rate of water transmission.
B. (Moderately low runoff potential). Soils having moderate infiltration rates
when thoroughly wetted, and consisting chiefly of moderately fine to moderately
coarse textures. These soils have a moderate rate of water transmission.
C. (moderately high runoff potential). Soils having slow infiltration rates when
thoroughly wetted, and consisting chiefly of soils with a layer that impedes
downward movement of water, or soils with moderately fine to fine textures.
These soils have a slow rate of water transmission.
Op D. (High runoff potential). Soils having very slow infiltration rates when
thoroughly wetted and consisting chiefly of clay soils with a high swelling
potential, soils w1th-a permanent high water table, soils with a hardpan or
clay layer at or near the surface, and shallow soils over nearly impervious
material. These soils have a very slow rate of water transmission.
ND Data not currently available for this soil type.
*From ICS, TR-55, Second Edition, June 1986, Exhibit A-1. ReviTI-on—smade from
SCS, Soil Interpretation Record, Form 05, September 1988 and various county sc,
surveys.
III-1-10 FEBRUjM-Y—,-1M
17. Erosion' and Sediment Control —R—q,uirement -
FinancW Liability. Performance bonding, or other
appropriate financial instruments, shall be required
for all projects to ensure compliance with the
approved erosion and sediment control plan.
ABON Urfi: Q 7790,140B 3117N. 0
WA
A. Any new development or redevelopment with more than
2,000 square feet of new impervious surfacing shall be
required to provide storm water quality control.'
Compliance will be demonstrated by implementing an
approved Storm Water Site Plan. Guidelines for Storm
Water Site Plans are provided in the manual. Ile plan
must address the following requirements, in addition to
ESC requirements.
S-QQ Minimum RcQuirement _- Storm Water
Detention/Streambank Erosion Control. Storm
water discharges shall control stream bank erosion
and flooding of the downstream storm system by
limiting the peak rate of runoff from the site. The
predevelopment condition for all cases other -than
open water bodies shall be considered meadows or
young second growth forest. As the first priority to
meet this requirement, BWs shall utilize
infiltration to the fullest extent practicable -only if
site conditions are appropriate and ground water
quality is protected. Due to high ground water
tables in large portions of the City and a landslide
complex in the Meadowdale area (where high
ground water increases the slide hazard), there are
few sites within the City where infiltration should
be considered. Exhibit B delineates the areas where
infiltration may be feasible for this requirement if
the site satisfies the requirements outlined in the
Manual. BMPs shall be selected, designed, and
maintained according to the Manual. The minimum
diameter orifice size used for control shall be 5/8 of
an inch. In the - case of redevelopment, this
requirement shall apply only. to that portion of the
site that is being redeveloped. Any development or
redevelopment that has less than 5,000 square feet
83948.4 -13-
STORMWATZR MANAGEMENT MANUAL FOR THE PUGET SOUND BASIN
Table 111-1.3. SCS Western Washington Runoff Curve Numbers
(Published by SCS in 1982) Runoff curve numbers for selected agricultural,
suburban and urban
land ume for qhma lk rainfall d1&*r1hut1nn- 2A-hnur storm duration -
LAND USE DESCRIPTION
CURVE
NUMBERS BY
HYDROLOGIC
SOIL GROUP
A
B
C
D
Cultivated land(l):
'winter condition
86
91
94
95
Mountain open areas:
low growing brush grasslands
74
82
89
92
Meadow or pasture:
65
78
85
89
Wood or forest land:
undisturbed
42
64
76
81
Wood or forest land:
young second growth or brush
55
72
81
86
Orchard:
with cover crop
81
88
92
914
Open spaces, lawns,
parks, golf courses, cemeteries,
landscaping.
Good condition:
grass cover on t75% of the
68
80
86
90
area
Fair condition:
grass cover on 50-75% of
77
85
90
92
the area
Gravel roads & parking lots:
76
85
89
91
Dirt roads & parking
lots:
72
82
87
89
Impervious surfaces,
pavement roofs etc.
98
98
98
98
Open water bodies:
lakes, wetlands, ponds etc.
100
100
100
100
Single family residential(2):
Dwelling Unit/Gross
Acre %Impervious(3)
Separate
curve
number
1.0 DU/GA
is
shall
be
selected
for
1.5 DU/GA
20
pervious
& impervious
2.0 DU/GA
25
portions
of the
site
2.5 DU/GA
30
or basin
3.0 DU/GA
34
3.5 DU/GA
38
4.0 DU/GA
42
4.5 DU/GA
46
5.0 DU/GA
48
5.5 DU/GA
50
6.0 DU/GA
52
.6.5 DU/GA
54
7.0 DU/GA
56
PUD's, condos, apartments, %impervious
commercial businesses must be
industrial areas
computed
(1) For a more detailed description of agricultural land use curve numbers refer
to National Engineering Handbook, Sec. 4, Hydrology, Chapter 9, August 1972.
(2) Assumes roof and driveway runoff in directed into street/storm system.
(3) The remaining pervious areas (lawn) are considered to be in good
condition for these curve numbers.
111-1-12 FEBRUARY, 1992
EXHIBIT 8
CitY Of Edmonds
C3
Washington Land Design
Planning *Engineering
Project:
De5cription:7;,4r,- w e�
Date: / 21.�V /17
By: V4F,!C—
'r -4aMma ry -rW.0 S1,WpAerr Cowe-w-
Z44,.'
0 a+.rIPr
2ft- &wa. -- F=
,rts "Mot
z
oA"p- <
Ir
4-2 046. X01).
-z7
A
.0-571
12
f
Al
5;.a,.4
—J7
7v tj
sm.,
7� C. .74 A--
10700 Meridian Avenue North, Suite 503, Seattle, Washington 98133 (206) 365-9510 Fax: (206) 365-0225
91
Washington Land Design
Planning Engineering
Proiect:
Description: 7-;7,-Yz .,,c
0-42 �6'
SID
2
42
2-:=
V
-7,-- --- Oz�2,IX'i
Date: / Z/M/417
B y: t�/.gF-
luluu mertman Avenue North, Suite 503, Seattle, Washington 98733 (206) 365-9570 Fax: (206) 365-0225
MEMORANDUM
Date: December 30, 1996
To: Planning Division
From: Gordy Hyde, Engineering Coordinator W--
Subject: Proposed 28'unit condominium for Robin Miller at
7218 -208th St. S.W. (ADB-96-150)
The.application has been reviewed by the Engineering Division. All
necessary� permits will have to be obtained. The applicant will have to comply
with the terms of Ordinance 3103 regarding storm water quality and quantity.
The project is located within the College Place Traffic Study area and as such
will be required to pay $22,616.00 in traffic mitigation fees at time of building
permit issuance. High traffic load driveways will be required. Curbing will be
required to separate landscaping from traffic areas. The City standard for .
parking stalls is 8.5 feet by 16.5 feet, with no compact designation. Sidewalks
adjacent to parking areas must be widened or the stalls must include wheel
stops. The minimum drive aisle width is 24 feet. There is no allowance for trees
encroaching upon the drive aisles. Frontage improvements will be required
across the property on 72nd Ave. W. The cost of these improvements will be
credited for the traffic mitigation fees. The Engineering Division has no other
comments on the proposal at this time. The application is considered complete
at this time.
CITY OF EDMONDS
ENGINEERING DIVISION
ADB96150.DOC
city of edmonds
land use application
ld�:ARCHITECTURAL DESIGN BOARD
E3 COMP PLAN AMENDMENT
13 CONDITIONAL USE PERMIT
0 HOME OCCUPATION
D FORMAL SUBDIVISION
L3 SHORT SUBDIVISION
El LOT LINE ADJUSTMENT
-W?-Fq-ANNED RESIDENTIAL DEVELOPMENT
El OFFICIAL STREET MAP AMENDMENT
STREET VACATION
El REZONE
El SHORELINE PERMIT
Q VARIANCE / REASONABLE USE
EXCEPTION
El OTHER
FILE ZONE
DATE 12-1191'21, REC'D BY T[3,lm6
FEE Zo?-, — RECEIPT# '7-2-1 94-
HEARING DATE
E) HE El STAFF Ell PB El ADB El CC
ACTION TAKEN:
0 APPROVED El DENIED El APPEALED
APPEAL#
Applicant Phone? -7'5 Z-
Address �(o. Are- wo, qkzo
Property Address or Location
Property Owner
Address
Agent
Address
�TaxAcc# -380) pop W5 e)060
� Legal Description -!DP-L bv-ej
:tv-N
Phone -,"-I 1�) '5 �� )--2— .
Phone
W, --)
Sec. Twp. Rng.
1 Details of Project or Proposed Use 2S , t (1)')t c 6*�Ylt> M'Nc) N*ut &A -6 �X9- 61,'L% 'L+
10he(l -AV.)R 00, It) -
The undersigned applicant, and his/ her/ its heirs, and assigns, in consideration of the processing of the
application agrees to release, indemnify, defend and hold the City of Edmonds harmless from any and all
damages, including reasonable attorney's fees, arising from any action or infraction based in whole or in part upon
false, misleading, inaccurate or incomplete information furnished by the applicant, his/ her/ its agents or
employees.
The undersigned applicant grants his/ her/ its permission for public officials and the staff of the City of Edmonds to
enter the subject property for the purpose of inspection and posting attendant to this application.
SIGNATURE OF APPLICANT/ OWNER/ AGENt-�-L, . �V
AL
LEGAL DESCRIPTION
PARCEL A:
TRACT 5, PLAT OF AURORA HEIGHTS, ACCORDING TO THE PLAT THEREOF
RECORDED IN VOLUME 12 OF PLATS, PAGE 120, RECORDS OF SNOHOMISH
COUNTY, WASHINGTON.
PARCEL B:
THAT PORTION OF TRACT- 6, AURORA HEIGHTS, ACCORDING TO 'HE PLAT
THEREOF RECORDED IN VOLUME 12 OF PLATS' PAGE' 120, REC'_-)RDS OF
SNOHOMISH COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS:
COMMENCING AT THE NORTHEAST CORNER OF SAID TRACT 6:
THENCE SOUTH ALONG THE EASTERLY LINE OF SAID TRACT 6, A DISTANCE
132 FEET;
THENCE WEST AND PARALLEL TO THE NORTH LINE OF SAID TRACT 6 TO
THE WEST BOUNDARY LINE OF TRACT 6;
THENCE NORTHERLY ALONG THE WEST LINE OF,SAID TRACT 6, A DISTANCE
OF 132 FEET TO THE NORTHWEST CORNER OF SAID TRACT 6;
THENCE EAST ALONG THE NORTH LINE TO THE POINT OF BEGINNING.
EXCEPT PORTION DEEDED TO CITY OF EDMONDS BY DEED RECORDED UNDER
AUDITOR'S FILE NO. 8911170207.
PARCEL C:
TRACT 6, AURORA HEIGHTS, ACCORDING TO THE PLAT THEREOF
RECORDED IN VOLUME 12 OF PLATS, PAGE 120, RECORDS OF SNOHOMISH
COUNTY, WASHINGTON;
EXCEPT THE )NORTH 212 FEET THEREOF.
SITUATE IN THE COUNTY OF SNOHOMISH, STATE OF WASHINGTON.
/C
c
I'll
FENCE (
WEST-
M / 7- XPIRE:3 q0 DI A YS
CITY OF EDMONDS
8 9 0 1 9
Address of Construction:
Z0900 -
,v' 1� A v,
SIDE SEWER PERMIT
PERMIT 9025
INJVP�_r)molob
Property Legal Description (Include all easements):
WOIRY\S PIE?'
Owner and/or Contractor: M KZ -DEVEL019 M&_t\)T' C-o . _1W C
StateLicenseNo. MK_T)DE:T_-*_:z330W - Building Permit No. q ?0
IYIA BALLINGER
[] y s LIET, STATION
0 Single Family Invasion into City Right-of-Way:]AKNo 0
Multi -Family (No. of Units RW Construction Permit No.
Commercial Cross other Private Property: V( No 11 Yes
11 Public 1
"'_� ,, K
Attach legal description and copy of recorded easement
I ce�tify that I have read and shall comply with al 6?1-ty requirements
as indicated on the back of the Permit Card.
c7?1 Apia! 19lit?
Date F
* CALL DIAL -A -DIG (1-800-424-5555) BEFORE ANY EXCAVATION *
OFFICE: USEONLY
FOR INSPECTION CALL 771-3W2, PUBLIC WORKS DEPT.
04 A 3 5 ''
Permit Fee: — &o, 00 Issued B
4712 V
Trunk Charge: 4-0- Date Issued: :j(a, C, 9
Assessment Fee: Receipt No.:
Lid Nov"20(o
Partial Inspection: I , SMA C's-T- -:Tr,, �J C,40 t-7 S Date 5- nitial _Cgn��
Comments
Reason Rejected: Date— Initial
Final Inspection Approved: Date Initial low
** PERMIT MUST BE POSTED ON JOB SITE **
White Copy: Fite Greeit Copy: tnspector Buff Copy: Applicant
Revised 3/90
The City of Edmonds
Side Sewer Drawing
EASEMENT NO. -.- ......................... --------------
b
N; W CONSTRUC1 ION J3�1 RFPAIRS F� LID NO . .................. ASMT. NO . .. ..............
OWNER................................ .......... --------------- ---- -------------------- --- ----- CCNTRACTOR ...... ----- ...................... ...................................... PERMIT NO. .3p.;ZT—
JOB ADDRESS ....... PP ....... -7.,;2 . . ....... LA
.. . ....................... LEGY'IL DESCRIPTION. LOT NO . . ............... .............. ..... BLOCK NO ........... ......... .............
T
Z%OP
PWW-0001-11/75 (REV. 11/78)
I Q-
....................................................... .............. ........ ..................................................................................
NAMEOF ADDITION --------- ------------------------------------------------------------------------------------------- -----------------
'V Zl�
Lil IIALLII�-(3-- -
-A-
7-
C�-
Approved: 1�1
DATE ..... 5�/f -1-f ................. By ..... C4:7n�� .....................
_4
VA Y's
CITY OF. EDMONDS SIDE SEWER PERMIT
18 '0 9 q PERMIT �Jo_ 9026
Address of Construction: ;z 0 90 Z -72 Ave W. 02)a)oobs WA
Property Legal Description (Include all easements):
Owner and/or Contractor: MV-D CO - _-Q-3C.
StateLicenseNo. Building Permit No. e?f(O U 7
Single Family Invasion into City Right -.of -Way: t�'No Yes
Multi -Family (No. of Units RW Construction Permit No.
Commercial Cross other Private Property: I No El Yes
Public Attach legal description and copy of recorded easement
I certify that I have read and shall comply wi,6ail city requirements Date
as indicated on the back of the Permit Card.
VIA BALLINGER
LIFT
. . STAT10rq
CALL DIAL -A -DIG (1-800-424-5555) BEFORE ANY EXECA
`6�FICE USE.ONLY
FOR INSPECTION CALL 771-3M, PUBLIC WORKS DEPT.
&o 00 OA�35
Permit Fee: — Issued 13 Ant&
. 0,257. 01) % 9*M
Trunk Charge Date Issued:
Assessment.Fee:
I iri Nlr)
Receipt No.:
Partial Inspection: cA,�E Cez k,-A, Date lnitialo&e/4e
Comments
Reason Rejected: Date —Initial
Final Inspection Approved: Date I
** PERMIT MUST. BE POSTED ON JOB SITE **
White Copy; File Green Copy: Inspector Buff Copy: Applicant
Revised 3190
The City of Edmonds Side Sewer Drawing EASEMENT NO - ------------ ..............
NEW CONSTRUCTION Rr' REPAIRS F1 LID NO. ._ ......... . — ASMT. No . ...............
OWNER ---------------------- --------- --------- ------- ------ -------------- CONTRACTOR ./V kj) ------ D.&v&.16p.(�je -
,.j
.0-.t ...... PERMIT NO.
............
JOB ADDRESS &V LEGAL DESCRIPTION: LOT NO . .................... ----------------- BLOCK NO - ---------------
NAMEOF ADDITION .................... --------------------------------------------------------------------------------------------------
�a)rrn I t - * fool (n
fil-L
PWW-0001-11/75 (REV.11/78)
7,�2,4.
I 0j
. %6SV
j,-j,5Ptcrc,r Ajo7 C4 IIJ
9x
Approved:
DATE ... ------- By
...........
ORMi7- &iPW43 `/0 -,014k6
CITY OF EDMONDS
SIDE SEWER PERMIT
PERMIT N2 9027
Address of Construction: 2 oFs a q- -7o? 1�4 A-ve W E bir of,) bs, Ub A
Property Legal Description (Include all easements): -
Owner and/or Contractor: MiLD TQE-�_)F::L_0J2M0&'4T
StateLicenseNo. M K-_bh0T_=X=Z 3=kQlA�1, -Building Permit No. S'05 4 2-
VIIA 13ALLINGER
T T10J
El Single Family Invasion into City Right -of -Way: X No S
YeLIFIT, STATION
�k Multi -Family (No. of Units 3 RW Construction Permit No.
1:1 Commercial Cross other Private Property:,KNo 0 Yes
0 Public Attach legal description and copy of recorded easement
I cert Ky i_hatT�av_e read and shall comply with arcity requirements
as indicated on the back of the Permit Card.
0? /
Date
* CALL DIAL -A -DIG (1-800-424-5555) BEFORE ANY EXCAVATION *
OFFICE USE ONL
FOR INSPECTION CALL 771-M2, PUBLIC WORKS DEPT.
&0, ( )0 a3,05
Permit Fee: Issued By
Trunk Charge Date Issued" 4kI (q�,
Assessment Fee:
Receipt No.:
Lid No.:
Partial Inspection: .1 SxA 17, 4iq� Cg�)_ Date5_�L:�717,rinitial
� ad
Comm�_nts�'
Reason Rejected:
Final Inspection Approved: Date 7-07- lnitial]9�-_C)
Date -initial
** PERMIT MUST BE POSTED ON JOB SITE **
White Copy: File Gre en Copy: Inspector Buff Copy: Applicant
Revised 3190
The city of Edmonds Side Sewer Drawing EASEMENT NO. — ................ -------------------
NEW CONSTRUCTION REPAIRS F1 LID NO. -- .............. ASMT. NO. — -------- ------
OWNER -------------------------------------------------------- — ------ -------------------------- ...... -------------
CONTRACTOR PERMIT NO. ?017
JOB ADDRESS ..020 ........ Ae4 ........................... LEGAL DESCRIPTION: LOT NO . ......... --------------------- ...... BLOCK NO - ----------------------- ....... —.-
.......... I .............. .............................. ........... ------------------------------------------------- .........................................
NAMEOF ADDITION- ... ............... .... -------- ........ .......................... --------------------------------------- ---------
00,
PM-0001-li/75(REV.11178)
VIA BALLINGER
'notj
L'Ft StAt
; ,Vsp-ecl-or 4.,101- Cc�/Ie-� 0,-.,,,i —1
Pr4lV;d,,) gr
Approved:
DATE "?--?i -------------------- � By
PrRm rr EA,,o, o�3 oA ys
CITY OF EDMONDS
SIDE SEWER PERMIT
8 9 0 1 9 PERMIT J\10 9028
Address of Construction: 20 'FS 0 (D _7;�""d W, elb(X)ok�)bS WA
Property Legal Description (Include all easements),:
A
Owner and/or Contractor:
State License No. Building Permit No.
13 Single Family Invasion into City Right-of-Way:0 No 0 XIA BALLINGER
Multi -Family (No. of Units RW Construction Permit No. LIET, S-TATIQU
Commercial Cross other Private Property: PkNo 11 Yes
El Public Attach legal description and copy of recorded easement
I certify that I have read and shall comply with a6ibity requirements
as indicated on the back of the Permit Card.
I
o? IAVAA�l
Date F
CALL DIAL -A -DIG (1-800-424-5555) BEFORE ANY EXCAVATION
-OFFICE USE ONLY
FOR INSPECTION CALL 771-3M, P BLIC WORKS DEPT.
Permit Fee: — & Im A �
00 Issued B0
U
Trunk Charge. -7500 Date Issued:.
Assessment Fee: Receipt No.:
Lid No.:
Partial Inspection: C,/,o Z D a t e =5-- 92�1 n i t i a I C44�4!:��
Com Mts>
Reason Rejected: Date —Initial —
Final Inspection Approved: Date ff, nitial R&
PERMIT MUST BE POSTED ON JOB SITE
WhiteCopy:File Green Copy: Inspector Buff Copy: �Ippficant
Revised 3!90
The City of Edmonds Side Sewer Drawing EASEMENT NO. ......... - ------------- -- I..-_.,,,
NEW CONSTRUCTION REPAIRS F-, LID NO . ........... ...... ASMT. NO - ----------
OWNER � .......................................... ---------------------------- ----------- CONTRACTOR ---- PERMIT NO. -940ak
- ...............
JOB ADDRESS .... LEGAL DESCRIPTION: LOT NO. - --- ----- ------------------------ BLOCK NO. ...... ---
NAMEOF ADDITION .................. .................... ------------------- ---------------------------- ---------------------------- —
�permlt# loag
VIA SALL*4GEIR
STAr
3 -jo
Ole -;�l c, 0,
iAa 5 Pe c-l-o r VOT- Ccffc� 40t.+w;�j
A pproved:
PWW-0001 - 11175 (REV. 11/78) -)ATE ..-45 ...... ........... Byz�� -- ------ -- - --------------
4 /-��
"SIDE SEWER PERMIT
CITY OF EDMONDS
18 9 0
PERMIT N2 9029
Address of Construction: 2 080!9 -7 P A Le t j-) 41D A
Property Legal Description (Include all easements):
U,
q
f-VTA BALLINGEaR
Ll
LIF-1 �STA
T1011
TIOP4
Owner and/or Contractor: ffilcb G-LC)j2rni=0-7 Co.
State License No. M Y, DhtE77=:Jt: 2 3 -3 Q LAD Building Permit No. 9 0.5 v-C7(-
Single Family Invasion into City Right -of -Way: 0— No 0 Yes
)9-M.ulti-Family (No. of Units -,3 RW Construction Permit No.
Commercial Cross other Private Property: No 0 Yes
Public Attach legal description and copy of'recorded easement
I certify that I have read and shall comply wit6lall city requirements
as indicated on the back of the Permit Card.
1
Date r
* CALL DIAL -A -DIG (1-800-424-5555) BEFORE ANY EXCAVATION *
OFFICEf,'USE 'ONLY-,
FOR INSPECTION CALL 771-Mk, PUBLIC WORKS DEPT.
OIA31,5, -
Permit Fee: 0 - 00 Issued By
Trunk Charge: -75, 06 Date Issued- :4
Assessment Fee: Receipt No.:
Lid No.:
Partial Inspection: 9 A I Date Ini
Cornrnpnits; J
Reason Rejected: Date —Initial
Final Inspection Approved: Date Initial
PERMIT MUST BE POSTED ON JOB SITE
WhiteCopy:File, Green Copy: Inspector Buff Copy: Applicant
Revised 3190
Tho C;tu ^f Fdmnnde Side Sewer Drawing I
EASEMENT No. ----------- ......
NEW CONSTRUCTION REPAIRS Ej LID NO . .......... ASMT- NO. ..........
OWNER.... ....................................... ------------- ........ .................. ......... CONTRACTOR
---------------------- ------ PERMIT NO. W.-
JOB ADDRESS --- LEGAL DESCRIPTION: LOT NO . ............ ........... ............. BLOCK NO - ----------------------- ------------
...... - .... I .................... ................................. -.1 .... --- ............................................ .....................................
NAME OF ADDITION ---------------------------
U"'o?o
I ?n Aw vs
3 Pr X,-Oo
PWW-Ml-11175 (REV, 11/78)
EVIA BALLINGER
LIF S T10
_ _N
-T STATIQN
Approved:
DATE .............. By 110L 'q"w
------------------------- - ---- ----------- * --------
RECEIVED
MEMORANDUM MAR 12 1998
ENGINEERING
Date: March 10, 1998
To: Jim Walker, P.E.
City Engineer
From: Noel Miller, P.
6 tor
PublicWork MDir" tor
Subject: Turnbury Lane Condominium Development
7218-208 th St. SW (ADB-96-150)
During the final review of this development, Public Works had some concerns
regarding the design of the sanitary sewer line from a maintenance perspective.
Presently, the plans call for the 8" sewer lines to be installed at a 0.5% slope. In
addition, a utility easement is required so that the city crews can mairitain the
system.
Public Works suggests the following:
1. The sewer lines should be installed at the steepest grade possible due to
the low expected flows in the 8" pipeline. A cursory review indicates that
the sewer lines could be installed at a 1% grade. This would need to be
verified at the time of construction.
2. Any of the sewer lines installed on private property should not be the
maintenance responsibility of the city.
If you need any further involvement from Public Works on this matter, please let
me know.
Thank you.
NM/Ik
cc: Jim Waite, Water/Sewer Supervisor
wordatMadminUumbury
Ll
DOUBLE EAGLE DEVELOPMENTS LLC
146 Third Avenue South - Edmonds - Washington 98020
(206) 583 0238 ~ (206) 775 3822 - Fax (206) 5a3 0306
February 6, 1998
Mr. Jim Walker
Engineering Dept, City of Edmonds
121 5h Ave. N., 2 d Floor
Edmonds, Washington 98020
Re: Traffic Mitigation Fees; Turnberry Lane Condominium
Dear Mr. Walker,
RECEIVED
FEB 0 6 icm
COMMUNI f Y SERVICL4
Our development company has concluded that the cost of completing the off -site
storm water and other improvements along 72" Ave. West, in accordance with the
approved civil engineering for the project, will substantially exceed the amount of the
mitigation fees indicated in correspondence from your department which are normally
collected at the time permits are issued.
Given the foregoing, -we request.that the collection of those mitigation fees be
eliminated from the final amounts payable to the City when permit fees are calculated,
since we will require the use, ofithose funds, and more, to complete the necessary off -site
improvements. - We understand that bonding or other suitable completion guarantees will
be required of us prior to the issuance of any permits.
If you have questions or concerns regarding our request, please contact me or
Peter Schroeder at 206.223.0393 as soon as possible. We look forward to beginning
work on the project within a few days. Thank you for your continued assistance.
Respectfully,
Bo Klepinger, LLC ember
c:
Ann Bullis, John Bissell Gordy Hyde
C e 1TJr),r-_�i6,"7
_�re et a?-7 CY(
�r � -� lc7 9>
h qJ e
re C�e r
+ ol
C71 cce 77' —at e-
CITY.- OF"EDMONDS BARBARA FAHEY
MAYOR
121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 FAX (425) 771-0221
COMMUNITY SERVICES DEPARTMENT
Public Works e Planning/Building e Parks and Recreation - Engineering - Wastewater Treatment Plant
January 23, 1998
Joseph Geivett
Washington Land Design
10700 Meridian N. #503
Seattle, WA 98133
Subject: Proposed 27-unit complex at 7218 - 208th St. S.W. (ADB-96-150)
Mr. Geiveft:
The Engineering Division has completed additional review of the engineered
site plan for the subject proposal. The attached comments on the enclosed
storm drainage report need to be addressed. When the revisions are completed,
please resubmit the enclosed red -lined report with two copies of the revised
report. Prior to issuance of construction approval, an estimate of construction
costs must be approved for bonding purposes. The Engineering Division review
and inspection fee will be calculated at 2.2% of the construction costs.
Additionally, $22,616 in traffic mitigation fees must be paid.
If you have questions regarding the stormwater review, please contact Don
Fiene, Hydraulics Engineer, at (425) 771-0220, extension 323. If you have other
questions contact Gordy Hyde, Engineering Coordinator, at (425) 771-0220,
extension 325.
Sincerely,
;,"um, 6. */,4
James C. Walker, P.E.
City Engineer
GCH/JCW/sf
Enclosure
c: Lara Knaak, Permit Coordinator
Bob Klepinger, owner
Pete Schrader, Architect
6150C.DOC
* Incorporated August 11, 1890 0
Sister Cities International — Hekinan, Japan
CITY OF EDMONDS BARBARA FAHEY
121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 FAX (425) 771-0221 MAYOR
1 Lw_� COMMUNITY SERVICES DEPARTMENT
Public Works * Planning/Building - Parks and Recreation e Engineering * Wastewater Treatment Plant
C.
December 23, 1997 mleZ4 J1__QJt Y17 7
Joseph Geivett
Washington Land Design
10700 Meridian N. #503
Seattle, WA 98133
Subject: Proposed 27-unit complex at 7218 - 208th St. S.W. (ADB-96-15PI
Mr. Geiveft:
The Engineering Division has completed additional review of the engineered
site plan for the subject proposal. Many of the comments from the earlier
reviews have not been addressed. The following comments apply:
• See comments on stormwater management report. Respond as indicated.
• Clarify the detention for stormw.ater from Building A. This runoff does not
naturally drain to the north. If you want to do this, the receiving system will
have to be analyzed. Otherwise, you must drain it to the on -site detention
system.
• ADS N-12 is not an acceptable pipe material in any area exposed to
vehicular traffic. This requirement pertains to private as well as public
property.
• Provide parking and drive aisle dimensions under and entering Building A.
• Domestic water service for single units can be adequately provided with a
3/4" meter. The DDC assembly and domestic service to Building A must be
accessible from the driveway. The 2" service may not be adequate for 19
units.
A minimum of a 14'driveway aisle must be provided between the curbs.
The 20'wide entry must be signed for one way traffic only or show as 24'
wide as shown on earlier submittals.
• Add 2"' of crushed surfacing - top course to pavement detail.
• Add/relocate catch basins as indicated.
I When the revisions are completed, please submit the enclosed red -lines with
two sets of revised drawings and revised stormwater calculations. Prior to
issuance of construction approval, an estimate of construction costs must be
approved for bonding purposes. The Engineering Division review and inspection
o Incorporated August 11, 1890 0
Sister Cities International — Hekinan, Japan
Joseph Geivett
Washington Land Design
December 23, 1997
Page 2
fee will be calculated at 2.2% of the construction costs. Additionally, $22,616 in
traffic mitigation fees must be paid.
If you have questions regarding stormwater, please contact Don Fiene,
Hydraulics Engineer at (425) 771-0220, extension 323. If you have questions
regarding utilities, please contact Jim Waite, Water/Sewer Supervisor, at (425)
771-0235. If you have other questions, contact Gordy Hyde, Engineering
Coordinator, at (425) 771-0220, extension 325.
Sincerely,
r
James C. Walker, P.E.
City Engineer
GCH/JCW/sf
Encl.
c: Lara Knaak, Permit Coordinator
Bob Klepinger, owner '
Pete Schrader, Architect
6150B.DOC
CITY OF EDMONDS BARBARA FAHEY
MAYOR
121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 FAX (425) 771-0221
COMMUNITY SERVICES DEPARTMENT
Public Works * Planning/Building e Parks and Recreation e Engineering - Wastewater Treatment Plant
C. is()"
December 3, 1997 miJ I zAllf 7
Joseph Geivett
Washington Land Design
10700 Meridian N. #503
Seattle, WA 98133
Subject: Proposed 27-unit complex at7218 - 208th St. S.W. (ADB-96-1591
Mr. Geivett:
The Engineering Division has completed additional review of the engineered site plan for
the subject proposal. The following comments apply:
0 See comments on stormwater management report. Respond as indicated.
Existing trees that are to be saved are to be pruned to maintain a minimum' of 7 feet of
clear area below the lowest hanging branches.
• When more than one acre is disturbed, a sediment trap is. required and the length of the
construction entrance is a minimum of 100 feet.
• Clarify the detention system in the vicinity of Building A. It appears that it drains to
detention, however, the calculations do not reflect this.
Provide profile of storm system and show all utility crossings.
ADS N-12 is not an acceptable pipe material in any area exposed to vehicular traffic.
Underground parking in Building A is to drain to sanitary sewer after passing through
oil/water separator.
Provide parking and drive aisle dimensions under and entering Building A.
Pavement is to encircle tree in front of Building C.
Show that curbs will be painted and stenciled for no parking.
Provide enclosed detail for high traffic load driveways.
Show configuration and signage for on -street parking.
Show location of mail boxes. Obtain approval from Edmonds Postmaster.
Sidewalks to be minimum 7 feet wide, or provide curb stops with 5 foot wide sidewalk.
0 Provide fire and aid address signs or ensure that addresses will be visible from the
street.
FDC and DDCV must be located outside of building.
Minimum grade on sewer is 2%.
Water meters are to be located within the easements.
Add water valves as noted.
Revise utility Note 4 as indicated.
Add 2 inches of crushed surfacing - top course to pavement detail.
a Incorporated August 11, 1890 0
Sister Cities International — Helkinan, Japan
Joseph Geivett
Washington Land Design
December 3, 1997
Page 2
Add/relocate catch basins as indicated.
The design of the storm system needs to be based upon a survey of the existing
conditions. Field changes should be minimized.
When the revisions are completed, please submit the enclosed red -lines with two sets of
revised drawings and revised stormwater calculations. Prior to issuance of construction
approval, an estimate of construction costs must be approved for bonding purposes. The
Engineering Division review and ins pection fee will be calculated at 2.2% of the construction
costs. Additionally, $22,616 in traffic mitigation fees must be paid.
If you have questions regarding stormwater, please contact Don Fiene, Hydraulics
Engineer, at (425) 771-0220, extension 323. If you have questions regarding utilities, please
contact Jim Waite, Water/Sewer Supervisor, at (425) 771-0235. If you have other questions
contact Gordy Hyde, Engineering Coordinator, at (425) 771-0220, extension 325.
Sincerely,
LIM`
James C. Walker, P.E.
City Engineer - -
GCH/sf
Enclosures
c: Lara Knaak, Permit Coordinator
Bob Klepinger, owner
Pete Schrader, Architect
6150A.DOC
40 C. 18913
CITY OF EDMONDS BARBARA FAHEY
121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 - FAX (425) 771-0221 MAYOR
COMMUNITY SERVICES DEPARTMENT
Public Works e Planning/Building - Parks and Recreation * Engineering - Wastewater Treatment Plant
September 24, 1997
Bob Klepinger
Double Eagle Developments LLC
146 Third Avenue South
Edmonds, WA 98020
Subject: Allowable Drainage Practices - ADB-96-150
Dear Mr. Klepinger:
�hada� ?/z Klq 7
It is unclear to Engineering staff how you came to believe that infiltration would be
allowed for your project near 21 Oth St. S.W. and 208th St. S.W. I have attached the map
showing.areas where infiltration is considered to be feasible. Your Fairway Ridge project
does not use infiltration as the primary method for controlling storm water. That project
de ' tained storm water and released it in the natural direction of flow through a spreader
trench.
Since storm drainage is customarily installed as part of a road improvement, a drain line
extended along the gutter line of 72nd Ave. W., where it would be used by the future road
project, could be considered a transportation improvement to the extent that it functions
as a road drainage collection system. If connection to your property required the drain to
be installed unusually deep , the incremental cost for installation of a deeper line would
not be part of transportation mitigation.
Please contact me at 771-0220 if you have any questions.
Sincerely,
t. lvj-e�-
JAMES C. WALKER, P.E.
City Engineer
JCW/sf
Attachment
ADB96150.DOC
* Incorporated August 11, 1890 0
Sister Cities International — Hekinan, Japan
EXHIBIT B
City of Edmonds
Infiltration Feasibility Mop <
Scale: 1"=4000'
16 q3
%6-
LEGEND 5TO"uW*ST
PARK
F2YMBOL MEANING
Sites where WiltroGon
P71 may be feas;ble. if
L�j condifions are met.
Sies where infiltration 68th
F] -t1I not be Per-itted.. N
7
CITY LIMITS C
197nd
4
main S
Yost
rk 12th I.
JJ
co `0
S1, 220th st.
224th
'228th SL
10 E
INGE
244th St.
205th St.-
;�' - P
I,? C. 18 (4 11
CITY OF EDMONDS BARBARA FAHEY
MAYOR
121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 - FAX (425) 771-0221
COMMUNITY SERVICES DEPARTMENT
Public Works - Planning/ Building 9 Parks and Recreation - Engineering - Wastewater Treatment Plant
September 10, 1997
Joseph Geivett
Washington Land Design
10700 Meridian N. #503
Seattle, WA 98133
Subject: Proposed 27-unit complex at 7218 - 208th St. S.W. (ADB-96-1U0
Mr. Geivett:
The Engineering Division has completed initial review of the engineered site plan for the
subject proposal. The following comments apply:
Provide notes showing sequence of construction.
Incorporate attached note regarding stabilization of exposed areas.
Footing drains cannot be connected to the detention system.
Infiltration systems are not an acceptable method of stormwater conveyance. Stormwater
must be treated for water quality, detained, and released to the public storm system.
Additional storm drainage comments may be made upon review of revised plan.
Show all utility crossings on utility profile.
Provide easement(s) for public water and sewer lines on private property. Install cleanout
at property line.
Cleanouts and manholes are to be raised to grade and be provided locking Cl lids.
Underground parking in Building A is to drain to sanitary sewer after passing through
oil/water separator.
• Trees are to be pruned to maintain a minimum of seven feet of clear area below the lowest
hanging branches.
• Provide parking and drive aisle dimensions. Provide plan showing how parking will be
provided under Building A.
Show that curbs will be painted and stenciled for no parking.
Provide enclosed detail for high traffic load driveways.
Show configuration and signage for on -street parking.
Show location of mail boxes. Obtain approval from Edmonds Postmaster.
Sidewalks to be minimum seven feet wide, or provide curb stops with five foot wide
sidewalk.
Provide fire and aid address signs or ensure that addresses will be visible from the street.
Road section to be revised to reflect twenty feet from face of curb to centerline of public
right-of-way.
Pavement is to encircle tree in front of Building C.
61 SO.DOC
Incorporated August 11, 1890
Sister Cities International — Hekinan,.Japan
Joseph Geivett
Washington Land Design
September 10, 1997
Page 2
When the revisions are completed, please submit the enclosed red -lines with two sets of
revised drawings and revised stormwater calculations. Prior to issuance of construction
approval, an estimate of construction costs must be approved for bonding purposes. The
Engineering Division review and inspection fee will be calculated at 2.2% of the construction
costs. Additionally, $22,616 in traffic mitigation fees must be paid.
If you have questions regarding stormwater, please contact Don Fiene, Hydraulics
Engineer, at 771-0220, extension 323. If you have questions regarding utilities, please contact
Jim Waite, Water/Sewer Supervisor, at 771-0235. If you have other questions, contact Gordy
Hyde, Engineering Coordinator, at 771-0220, extension 325.
Sincerely,
e,
James C. Walker
City Engineer
GCH/JCW/sf
Enclosure
c: Lara Knaak, Permit Coordinator
6150.DOC
PLANNING DATA
NAME:
SITE ADDRESS:- ADATE:
ZONING: PLAN CHK#:
PROJECT DESCRIPTION: 61�3r 01of T- eollr�11?
CORNERLOT ;L� - � (Yes/No)
SETBACKS:
Required Setbacks: -7-4 IV/175r- -CLjort4 ,
'2,0& XmAt: /< L$#4kIc- Right-61de- 10 RGaR. /0
Actual Setbacks:
Front: j<: Left Side: j c-;— Right Side: jo Rear: /*0
Street map checked for additional setback required? (Yes/No)
LEGAL NONCONFORMING LAND USE DETERMINATION ISSUED fih -(Y/N)
LOT COVERAGE:
Maximum Allowed: Actual:
BUILDING HEIGHT:
-3-3 &/,
Maximum Allowed: Actual Height: —
Datum Point: 'Datum Elevation:
II
A.D.U. CREATED?: X/O
SUBDIVISION:
CRITICAL AREAS #: '74 - 2 q6 - i 1-)o � u -),r
SEPA DETERMINATION:
LOT AREA: 9,q -7
OTHER: Uvoln, -
Plan Review By:
cAfi1es\permiA^p1andat.doc
Run Date: 02/05/98
Miller Construction Co., Inc.
Page:
1
J/C Date: 02/05/98
JOB ES*E
PRINTING - ITEM COST PRICE
SUMMARY
Time:
08:43 AM
ESTIMATE NO: 4636-555
----------------------------
TURNBERRY-TOWNHOUSES REVISED
�.: -------------------------
-M
----------------------------------------------------------
ESTIMATOR: JERRY COX
JOB ADDRESS:
S.F.:
13,238
JOB TYPE: GEN General Contract
START DATE:
EST.STATUS: N NEW
COMMENT:
COMPL DATE:
STATUS DATE: 02/04/98
CONTACT:
PHONE:
-
EXT:
+---TAKE OFF---+
EXTENDED
EXTENDED
LINE ITEM CODE
DESCRIPTION
U/M QUANTITY UNIT CO�T
COST
MARKUP
PRICE
1
Demolition & Abatement
1.000 13320.000
13,320.00
.00
13,320.00
2
Mitigation Fees - Edmonds
1.000 7484.180
7,4B4.18
.00
7,484.18
3 *SUB
------------
20,804.18
------------
.00
------------
20,604.18
4
5
SITEWORK OFF SITE:
6
Site Utilities 6 Earthwork
1.000 47625.000
47,625.00
.00
* 47,625.00
7
Sidewalk & Formed Curbs
1.000 6818.000
61818.00
.00
AA 6,818.00
45 10 0
8
Asphalt Paving - off site
1.000 4300.000
4,300.00
.00
41 4,300.00
0o
9
G.C.,Insurance, B&O & Overhead
1.000 0.000
.00
8,693.96
6,693.96
$A)P.
10 *SUB
TOTAL SITEWORK - OFF SITE
------------
58,743.00
------------
8,693.96
------------
67,436.96
11
12
SITEWORK - ON SITE:
13
Surveyor
1.000 900.000
900.00
.00
900.00
14
Site Utilities & Earthwork
1.000 99168.400
99,168.40
.00
Af 99,168.40
15
Sidewalk & Formed Curbs
1.000 10500,000
10,500.00
.00
*'10,500.00
16
Asphalt Paving on site
1.000 18995.000
18,995.00
.00
d-18,995.00
2 SOP
17
Striping
1.000 800.000
800.00
.00
800.00
18
Extruded Curbs
920.000 1.750
1,610.00
.00
1,610.00
0 0
19
Landscaping
1.000 59600.000
59,600.00
.00
59,600.00
20,
Fences
290.000 14.700
4,263.00
.00
4,263.00
21
Dumpster Enclosers
2.000 '735.000
1,470.00
.00
1,470.00
22
G.C.,Insurance, B&O & Overhead
1.000 0.000
.00
29,201.35
29,201.35
23 *SUB
TOTAL SITEWORK - ON SITE -
------------
------------
197,306.40
---------
29,201.35
226,50-1..75
0
24
4 925 000
(D
q
0
A 1-7 5. 0)
J6
CITY OF EDMONDS
D' d
ir
Date Eoy es
RRARA FAHEY
MAYOR
121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 - FAX (425) 771-0221
COMMUNITY SERVICES DEPARTMENT
Public Works * Planning/ Building * Parks and Recreation * Engineering o Wastewater Treatment Plant
WOU"1112
Edmonds Subdivision/Plat/Permit No . AD P-> 9 ( , - fs-o
Project Name 7_u,&v8e?e46-1
Project Address -7-2 / b - nk 7-V -S7-. -S -
Owner/Developer/Contractor R
WASHINGTON MUTUAL LOAN 01-0980-000976108-1
INC.
With reference to the above -identified matter, this will certify that this institution has a savings
account (or loan) for the above -referenced developer for the project so identified. In consideration of
the permitted development of the property, and in lieu of a performance bond, this institution hereby
agrees that it will freeze the sums of money for the indicated site improvements pending written
authorization for release of said funds by the City of Edmonds in the amount of $ -�215� —
The total sum indicated will be withheld by this institution from any disbursements of any kind until
written authorization has been received by the institution from the City of Edmonds to release the sum
of money indicated by the written authorization from the City.
The design, location, materials and other specifications for the indicated site improvements are
those require . d by the City of Edmonds as appear in the above -referenced Edmonds file and in
compliance with Chapter 17. 10 ECDC of said City.
In the'event the owner/developer/contractor fails to complete the indicated improvements within
the City of Edmonds may demand, and the institution shall make,
payment to the City of said funds so that the improvements can be installed or completed immediately
to City standards. The institution shall not be liable to the owner for any disbursement of said funds to
the City of Edmonds.
It is hereby specifically agreed by and between the parties hereto that -in the event that any legal
action must be taken to enforce the provisions of this bond or to collect said bond, that the prevailing
party shall be entitled to collect its cost and reasonable attorneys' fees as a part of the reasonable costs
of securing the obligation hereunder. In the event of settlement or resolution of these issues, prior to
the filing of any suite, the actual costs incurred by the City, including reasonable attorneys' fees, shall
be considered a part of the obligation here ' under secured. Said costs and reasonable legal fees shall be
recoverable by the prevailing party, not only from the proceeds of this bond, but also over and above
said body as a part of any re* covery in any judicial proceeding, in addition to recovery of the bond.
0 Incorporated August 11, 1890 0
Sister Cities International — Hekinan, Japan
City of Edmonds
Pertcrma=6 Bond - Frozen Fund
Page 2
WASHINGTON MUTUAL BANK . MKD DEVELOPMENT CO., INC. JANICE J. MOORE IN(
XZ___ 1-111 APPROVED. --
NAME OF FIN������ Oyj ER/DE E PER/CONTRACTOR
PETER-H. STERNITZKY, FIRST VICE PRE3'SKNT
OFFICER SIGNATURE/TITLE SI NATURE: O� A��
PO BOX 91141 FTH0340
INSTITUTION MAILING ADDRESS MAILING ADDRESS
SEATTLE, WA 98111-9752
Oez_48rV64'!5� 6c'1'4� 9iao�(
CITY/STATE/ZIP CITY/ ATE/Z
(800) 388-1411 x1 ACCEPTED:
PHONE CITY OF EDMONDS Eii&NEERIN&
01-0980-000976108-1 too
ACCOUNT NUMBER DATE
STATE OF WASHINGTON)
) ss
COUNTY OF KING
On this 4th day of AUGUST
011 �11
W - = I
19 98 , before me, the undersigned, a Notary
Public in and for the State of Washington, duly commissioned and sworn, personally appeared
PRTRR u - qTRRwTTay TOME KNOWN TO BE THE FTR-.;T yTrE PRE-.;TDF.NT
TITLE
of WASHINGTON MUTUAL BANK the corporation that executed the foregoing instrument,
FINANCIAL INSTITUTION
and acknowledged the said instrument to be the free and voluntary act and deed of said corporation, f -or the
uses and purposes therein mentioned, and on oath stated that HE was authorized to ex e*cute said
.: .- - , ; instrument and that the - seal affixed is the corporate, seal of said corporation.
WITNESS my hand and official seal hereto affixed the day and year first above written.
............
A/
0 T A R
(S
0
k\\F WAS
NOTARY PUBLIC in and for the
State of Washington, residing at
sw= Ra6rek)nd
BONDPFFF.DOC
Revised 09/96
tun Date: 02/05/98 _-�R. Miller Construction Co., Inc.
T/C Date; 01/05/9's JOB RINTING - ITEM COST A PRICE SUMMARY
0
:STIMAT& NO: 4636-555 TURNBERRY TOWNHOUSES REVISED
------------------------------------------------------- -----------------------
7SIP'runTOR: JERRY COX
Page: 1
Time: 08:43 AM
�_QQ:
S. F.:
JOB TYPE:
GEN General Contract
START DATE:
EST.STATUS:
N NEN
COMMENT:
COMPL DATE:
STATUS DATE:
02/04/98
CONTACT:
PHONE-
+ ---TAKE CFF---+
EXTENDED
EXTENDED
LINE ITEM CODE
DESCRIPTION
U/M QUANTITY UNIT COiT
COST
MARKUP PRICE
I
Demolition
A Abatement
1.000 13320.000
13,320.00
.00 13,320.00
2
Mitigation
Fees - Edmonds
1.000 7484.180
7,484 .18
------------
.00 7,484.18
3 *SUB
20,804.18
------------ ------------
.00 20,804.18
13,238
EXT:
SITEWORK - OFF SITE:
Site Utilities & Earthwork
1.000
47625.000
47,625.00
.00
10 47, 625.00
Sidewalk & Formed Curbs
1.000
6818.000
61818.00
.00
A 6,818.00
45 (00
Asphalt Paving off site
1.000
4300.000
4,300.00
-00
4 4,300.00
'5100
G.C.,Insurance, BiO Overhead
1.000
0.000
.00
8,693.96
8,693.96
TOTAL SITEWORK OFF SITE
------------
58,743.00
------------
8,693.96
------------
67,436.96
SITEWORK - ON SITE:
Surveyor
1.000
900,000
900.00
.00
900.00
Site Utilities Earthwork
1.000
99168.400
99,168.40
.00
d 99,168.40
Sidewalk & Formed Curbs
1.000
10500.000
10,500.00
.00
* 10,500.00
.Asphalt Paving -,On site
1.000
1S995.000
18,995.00
.00
418,995.00
2
Striping
1.000
000.000
800.00
.00
A 800.00
Extruded Curbs
920.000
1.750
1,610.00
.00
* 1,610.00
Landscaping
1.000
59600.000
59,600.00
.00
59,600.00
Fences
290.000
14.700
4,263.00
.00
4,263.00
Dumpster Enclosers
2.000
735.000
1,470.00
.00
1,470.00
G..C.,Insurance, B&O A Overhead
1.000
0.000
.00
29,201.35
29,201.35
TOTAL SrTEWORK - ON SITE -
------------
------------
197,306.40
------------
29,201-35
226,507,75
So
00 c)
plID q
AD
Ozz
�No
-
LETTER OF TRANSMITTAL
Washington Land Design
9709 Third Avenue N.E., Suite 203, Seattle, WA 98115-2027
(206) 522-95 10 FAX: (206) 522-8344 E-Mail: wld@wldengr.com
Date: April 6, 1998
To: Gordy Hyde, City of Edmonds
From: Bill Fortunato
Re: Turnberry Condominiums; Edmonds, Washington
Remarks
Please find the attached Site Sections of the earthwork and area calculations, per your
request, for the above referenced project. Washington Land Design has utilized the
Softclesk Earthworks software to calculate the approximate grading quantities, as requested.
The end area calculation yielded 2,147 cubic yards of cut material, and 1,056 cubic yards
of fill material. This would have an export of approximately 1,091 cubic yards of soil.
Also included is a calculation of the approximate earthwork for the proposed utilities. This
earthwork quantity was found to be approximately 1,400 cubic yards.
If you have any questions regarding this transmittal, please feel free to call.
edpsgh03.trn
-)-?& -/ 115 A)
Washington Land Design
Planning * Engineering
Project:
Description: Z)Inr4z-ry 2s��.'A VA F.7 to tv
Date:
B y: W4 z;m,
OWES" AWE, Allaa1z. VJ-
cc �F-
wz�
J.
�7
wis4ie i.. ic
61= 7;IV V20C r.4-
10700 Meridian Avenue North, Suite 503, Seattle, Washington 98133 (206) 365-9510 Fax: (206) 365-0225
0
7 1999
et4Gjt4FFFkiNG
208th Street Southwest & 7rd Avenue West
Prepared by. -
Washington Land Design
9709 Third Avenue N.E., Suite 203
Seattle, Washington 98115
(206) 522-9510
FAX: (206) 522-8344
9% C�f
f—EXPIRES 7/7/-fq j
July 18,1997
Revised October 28, 1997
Revised December 12, 1997
Revised December 29, 1997
Revised January 23, 1998
TABLE OF CONTENTS
VicinityMap ..................................................................................................................... 1
ProjectNarrative .............................................................................................................. 2
Project Description
Existing Conditions
Proposed Storm Sewer System
Stormwater Detention
Stormwater Quality
Conveyance
ExistingConditions Map .................................................................................................. 5
ProposedCondition Map ................................................................................................. 7
Stormwater Runoff Hydrographs ..................................................................................... 9
1 0-Year, 24 Hour Design Storm
1 00-Year, 24 Hour Design Storm
Flow Control Structure Calculations .............................................................................. 16
1 0-Year, 24 Hour Design Storm
1 00-year, 24 hour Design Storm
Stormwater Conveyance Calculations ........................................................................... 22
FlowControl Detail ........................................................................................................ 24
Coalescing Plate Structure Detail .................................................................................. 26
Curve Number Calculations ........................................................................................... 28
Time of Concentration Calculations ............................................................................... 30
Tumberry Lane Condominiums
July 18,1997
Revised January 23, 1998
. . . ........................................
HIN(lify 1! WILM Wy
Sm X). RI - __ kILL - - - r. 10". - -
pful�m!�f Sf P1 I
I A
BRACK[ T T5
5 1 W
CASP 'R T
HIA(H WY VINIC,'AL
NOTH w ;,f)
�i*f,, pt : 'A., : . ; i i.
t., IAST %W
CL"DS
I I RRA 202IND
re
20"NL)
CO)IMMIT), 2:)M
(;I i N '.T �'.t I;:'� PL SW
?0 M 5 T COL L IGE
2
N�
S
J;Aj f Y %It RRI r
4r
w
%W
CIR Y'RA( I
"'PLAY)"It 17
-71
4c -.41 p[ME
ow
w
C01 i FG1 PtArf
s I PK C Itf ell
'KjMrlLR 201M ST w DRIVING RANI
MAIN:
ST Po
to
1)"y ION:
YOS T
MAPH . I- - 41
ST 209TH Pt
ES.
s sw 21OTli I 210ft S T Sw
4 ADMIAL
AUX T PAW ST .
3T
w
A I NO I ST
SW-! -I i n! s
i:
sl ST
C 4i,, 21
~[IL wy
L
V sl sw
j Ru
I/V PARK
MTH PL
t DI plop'0, X
oc. X" < .-i
sr Sw __�3TH
p Sw
Yl W\
2 RIDE
?15
sw I ?ICH S T "W
Im-
:§
c� ST
pl,[ r
?161H T
2 161" ST sw
— ?16TI T S,
s
2 11 TH I
sw
sw
w
el
w
s . 7 f Lm ST
LIM 51
-UT w
ST
ITOTH
L 2 Z UIH 220TH
ITcome S9 E., "t: - z sr sw
p/
iZ
ivfR
J* A: I
t spf� RAM - 0C f;pFi N
'A kA
2?41ti
PK
_ IT-1
A
2 �
PROJECT NARRATIVE
PROJECT DESCRIPTION
The proposed project is on a 1.20 acre parcel to be redeveloped into a condominium
complex. This project consists of the construction of four two-story buildings, parking,
landscaping, stormwater conveyance/detention, utility improvements, and site grading
to accommodate these improvements. The three existing on -site buildings (3,560 SF,
1202 SF, and 1,061 SF in area) will be demolished to accommodate the proposed
development.
The stormwater quantity and quality management system for the project has been
designed in accordance with applicable requirements of the Washington State
Department of Ecology Stormwater Manual and the City of Edmonds Storm Drainage
Ordinances.
EXISTING CONDITIONS
The site is located adjacent to the northwestern corner of the intersection of 208 th
Street SW and 72 nd Avenue W. On the existing site is a small private school. The
overall site topography slopes from the northeastern portion of the property to the
southwestern portion. The existing grades vary between 427 feet and 413 feet above
mean sea level. Refer to the attached sketch of the existing site conditions.
PROPOSED STORM SEWER SYSTEM
Stormwater quality and quantity management has been designed in accordance with
applicable requirements of the Washington State Department of Ecology Stormwater
Manual.
WWI
The proposed stormwater management system is designed to detain and treat the
stormwater runoff for the areas subject to vehicular traffic. The detention system will
consist of an underground detention pipe and a flow control structure which is to be
located in the southeastern portion of the property. Detention of the increase in runoff
due to the development of the site is addressed in the Stormwater Quality and
Stormwater Detention sections of this report.
The conveyance calculations for the storm system have been based upon the 25-year
design storm as calculated using the SCS method as implemented in Waterworks
software by Engenious Systems, Inc. The proposed drainage system is composed of
curb and gutter, catch basins, and underground storm drainage pipe.
2
Tumberry Lane Condominiums
July 18,1997
Revised January 23, 1998
L_.1
0
STORMWATER DETENTION
Stormwater.,runoff will be detained and released at or below the pre -developed runoff rates
Runoff will be conveyed through an oil/water separator and then into the proposed extension
of the public storm drainage system in 72nd Avenue W.
DETENTION
The stormwater runoff is conveyed to the on -site underground detention pipe. The
stormwater detention system has been designed to provide detention for the peak runoff for
the 10 and 1 00-year, 24 hour storm events based upon the SCS methodology as directed by
the City of Edmonds. Curve numbers used in determining the design storms have been
based upon available soils information.
The pre -developed (existing) 1 0-year and 1 00-year, 24 hour discharges for the entire site
are 0.24 els and 0.49 cfs respectively. The detention calculations for the stormwater
management system have been based upon the SCS method as implemented in Waterworks
software by Engenious Systems, Inc., and are provided in the Appendix. The table below
summarizes the detention analysis.
Pervious Area
0.34 AC
Impervious Area
0.86 AC
Existing 10yr peak flow
0.24 cfs
Existing 100yr peak flow
.0.49cfs
Proposed 10yr peak flow*
0.47 cfs
Proposed 1 00vr peak flow*
0.75 cfs
*Proposed peak flow before detention
STORMWATER QUALITY
OIUWA TER SEPARATION
The stormwater runoff which is subject to vehicular shall be treated after it has been
detained. Although other BIVIP's for water quality are preferred, an oil/water separator
was selected due to space constraints. The oil/water separator has been sized to treat
the 1 0-year, 24 hour storm.
3
Tumberry Lane Condominiums
July 18,1997
Revised January 23,1998
Existing Conditions Map
f
t
L
LL------ -
c
®rliVi
r-r -I -
Li
GRA1441C SCALE
—J'
NO DAIL B*
208th STREET CONDOMINIUMS
Manning Engineening
EDMONDS, WASHINGT
EXISTING CONDITIONS
0
P'a
Proposed Condition Basin Map
Turnberry Lane Condominiums
July 18, 1997
Revised December 29,1997
0
Stormwater Runoff Hydrographs
Time in Hours
Hyd
No.:
28
Rate:
0.25
cfs
Vol
0.08
Ac-ft
Hyd
No.:
28
Rate:
0.29
cfs
Vol
0.11
Ac-ft
Hyd
No.:
28
RaLe:
0.43
cfs
Vol
0.15
Ac-ft
Hyd
No.:
28
Rate:
0.17
cfs
Vol :
0.06
Ac-ft
Time:
8.33
hr
In,t:
10.00
min
Time:
8.50
hr
Int:
10.00
min
Time:
8.3 3
hr
Int:
10.00
min
Time:
8.33
hr
Int:
10.00
min
Time in Hours
0 0
Hyd
No.:
28
Rate:
Vol
Hyd
No.:
28
Rate:
Vol
Hyd
No.:'-
28
Rate:
Vol
Hyd
No.:
28
Rate:
Vol :
0.39
cfs
Time:
8.17
hr
0.13
Ac-ft
Int:
10.00
min
0.55
cfe
Time:
8.50
hr
0.19
Ac-ft
Int:
10.00
min
0.70
cfs
Time:
8.17
hr
0.24
Ac-ft
Int:
10.00
min
0.30
cfs
Time:
8.33
hr
0.11
Ac-ft
Int:
10.00
min
1/23/98 page I
Tumberry Lane Condominiums
Edmonds, Washington
BASIN SUMMARY
BASIN ID: 100YRDTN NAME: 100 YEAR 027;�
SCS METHODOLOGY
TOTAL AREA ....... : 1.20 Acres BASEFLOWS: 0.00 cfs
RAINFALL TYPE .... TYPE I A PERV IMP
PRECIPITATION .... : 3.00 inches AREA..: 0.34 Acres 0.86 Acres
TIME INTERVAL .... 10.00 min CN .... : 92.00 98.00
TC .... : 5.00 min 5.00 min
ABSTRACTION COEFF: 0.20
TcReach - Shallow L: 50.00 ks: 11.00 s:0.0500
impTcReach -Sheet L: 115.00 ns:0.01 10 p2yr: 1.50 s:0.0005
PEAK RATE: 0.75 cfs VOL: 0.25 Ac-ft TIME: 490 min
BASIN ID: 100YREX NAME: 100 YEAR EXISTING STORM
SCS METHODOLOGY
TOTAL AREA ....... : 1.20 Acres BASEFLOWS: 0.00 cfs
RAINFALL TYPE .... TYPE I A PERV HAP
PRECIPITATION .... : 3.00 inches AREA..: 1.04 Acres 0. 16 Acres
TIME INTERVAL .... 10.00 min CN .... : 86.00 98.00
TC .... : 12.89 min 5.00 min
ABSTRACTION COEFF: 0.20
TcReach - Sheet L: 300.00 ns:0.0600 p2yr: 1.50 s:0.0400
TcReach - Shallow L: 50.00 ks: 11.00 s:0.0500
impTcReach - Sheet L: 115.00 ns:0.0 110 p2yr: 1.50 s:0.0005
PEAK RATE: 0. 49 cfs VOL: 0. 17 Ac-ft TIME: 5 10 min
1/23/98 page 2
Turnberry Lane Condominiums
Edmonds, Washington
----------
BASIN SUNM4ARY
PEV090090)
BASIN ED: IOYRDTN NAME: 10 YEAR DE�E��
SCS METHODOLOGY
TOTAL AREA ....... : 1.20 Acres BASEFLOWS: 0.00 cfs
RAINFALL TYPE .... TYPE I A PERV IN[P
PRECIPITATION .... : 2.00 inches AREA..: 0.34 Acres 0.86 Acres
TIME INTERVAL .... 10.00 min CN .... : 92.00 98.00
TC .... : 5.00 min 5.00 min
ABSTRACTION COEFF: 0.20
TcReach - Shallow L: 50.00 ks: 11.00 s:0.0500
impTcReach -Sheet L: 115.00 ns:0.01 10 p2yr: 1.50 s:0.0005
PEAK RATE: 0.47 cfs VOL: 0. 16 Ac-ft TIME: 500 min
BASIN ID: IOYREX NAME: 10 YEAR EXISTING STORM
SCS METHODOLOGY
TOTAL AREA ....... : 1.20 Acres BASEFLOWS: 0.00 cfs
RAINFALL TYPE .... TYPE I A PERV RVIP
PRECIPITATION .... : 2.00inches AREA..: 1.04Acres 0.16Acres
TIME INTERVAL .... 10.00 min CN .... : 86.00 98.00
TC .... : 12.89 min 5.00 min
ABSTRACTION COEFF: 0.20
TcReach - Sheet L: 300.00 ns:0.0600 p2yr: 1.50 s:0.0400
TcReach - Shallow L: 50.00 ks: 11.00 s:0.0500
impTcReach -Sheet L: 115.00 ns:0.01 10 p2yr: 1.50 s:0.0005
PEAK RATE: 0.24 cfs VOL: 0.09 Ac-ft TIME: 5 10 min
Flow Control Structure Calculations
1/23/98 page 5
Turnberry Lane Condominiums
Edmonds, Washington'
STAGE DISCHARGE TABLE
MULTEPLE ORIFICE ID No. ORIFICE
Description: ORIFICE
Outlet Elev: 411.80
Elev: 409.80 ft Orifice Diameter: 2.3400 in.
Elev: 414.50 ft Orifice 2 Diameter: 2.2500 in. lop
STAGE <--DISCHARGE --- > STAGE <--DISCHARGE --- > STAGE <--DISCHARGE --- > STAGE <--DISCHARGE
(ft) --- cfs -- ------- (ft) --- cfs -- ------- (ft) --- CA -- ------- (ft) --- cfs -- -------
411.80
0.0000
413.10
0.1694
414.40
0.2396
415.70
0.4439
411.90
0.0470
413.20
0.1758
414.50
0.2442
415.80
0.4538
412.00
0.0665
413.30
0.1820
414.60
0.2921
415.90
0.4634
412.10
0.0814
413.40
0.1880
414.70
0,3145
416.00
0.4728
412.20
0.0940
413.50
0.1937
414.80
0.3326
416.10
0.4819 0000"
412.30
0.1051
413.60
0.1994
414.90
0.3485
416.20
0.4908
412.40
0.1151
413.70
0.2048
415.00
0.3630
416.30
0.4995
412.50
0.1243
413.80
0.2101
415.10
0.3763
416.40
0.5081
412.60
0.1329
413.90
0.2153
415.20
0.3889
416.50
0.5164
412.70
0.1410
414.00
0.2204
415.30
0.4009
416.60
0.5246
412.80
0,1486
414.10
0.2254
415.40
0.4123
416.70
0.5327
412.90
0.1558
414.20
0.2302
415.50
0.4232
416.80
0.5406
413.00
0.1628
414.30
0.2349
415.60
0.4337
1/23/98 page 7
Turnberry Lane Condominiums
Edmonds, Washington
LEVEL POOL TABLE SUMMARY
MATCH INFLOW -STO- -DIS- <-PEAK-> STORAGE
< -------- DESCRIPTION --------- > (cfs) (cfs) --id- --id- <-STAGE> id VOL (cf)
10 YR ........................ 0.24 0.47 PIPE FLCTRSTR 414.49Y 613.77 cf
100 YR ....................... 0.49 0.75 PEPE FLCTRSTR 416.2 2 1046.16 cf
"MMMENEWO
1/23/98 page 4
Turnberry Lane Condominiums
Edmonds, Washington
STAGE DISCHARGE TABLE
COMBINATION DISCHARGE ID No. FLCTRSTR
Description: FLOW CONTROL STRUCTURE
Structure: ORIFICE Structure:
Structure: WEIR Structure:
Structure:
STAGE <--DISCHARGE --- > STAGE <--DISCHARGE --- > STAGE <--DISCHARGE---> STAGE <--DISCHARGE
(ft) --- cfs -- ------- (ft) --- cfs -- ------- (ft) --- cfs -- ------- (ft) --- cfs -- -------
411.80 0.0000 411.90 0.0470 412.00 0.0665 412.00 0.0665
1/23/98 page 6
Turnberry Lane Condominiums
Edmonds, Washington'%
STAGE DISCHARGE TABLE
BROAD CRESTED WEIR ID No. WEIR
Description: OVERFLOW WEIR
cd: 3.2100 Weir length: 1.0000 ft.
El: 416.75 ft. Weir Increm: 0. 10
STAGE <--DISCHARGE --- > STAGE <--DISCHARGE --- > STAGE <--DISCHARGE --- > STAGE <--DISCHARGE
(ft) --- cfs -- ------- (ft) --- cfs -- ------- (ft) --- cfs -- ------- (ft) ---cfs -- -------
416.75 0.0000 416.80 0.0402 416.80 0.0402 416.80 0.0402
1/23/98 page 3
Turnberry Lane Condominiums
Edmonds, Washington
STAGE STORAGE TABLE
UNDERGROUND PEPE ID No. PIPE
Description: DETENTION PIPE
Diameter: 5.00 ft. Length: 57.00 ft.
Slope ... : 0.0000 ft/ft upstr: dnstr:
STAGE < ---- STORAGE ---- > STAGE< ---- STORAGE ---- > STAGE< ---- STORAGE ---- > STAGE< ---- STORAGE >
(ft) --- cf --- -- Ac-Ft- (ft) --- cf --- -- Ac-Ft- (ft) --- cf--- --Ac-Ft- (ft) --- cf --- -- Ac-Ft-
411.80
0.0000 0.0000
413.10
231.23 0.0053
414.40
588.09 0.0135
415.70
936.63 0.0215
411.90
5.3417 0.0001
413.20
256.53 0.0059
414.50
616.54 0.0142
415.80
959.84 0.0220
412.00
15.016 0.0003
413.30
282.39 0.0065
414.60
644.89 0.0148
415.90
982.20 0.0225
412.10
27.416 0.0006
413.40
308.75 0.0071
414.70
673.11 0.0155
416.00
1004 0.0230
412.20
41.945 0.0010
413.50
335.55 0.0077
414.80
701.14 0.0161
416.10
1024 0.0235
412.30
58.247 0.0013
413.60
362.73 0.0083
414.90
728.94 0.0167
416.20
1W 0.0239
412.40
76.074 0.0017
413.70
390.25 0.0090
415.00
756.46 0.0174
416.30
1061 0.0244
412.50
95.237 0.0022
413.80
418.05 0.0096
415.10
783.64 0.0180
416.40
1077 0.0247
412.60
115.59 0.0027
413.90
446.08 0.0102
415.20
810.44 0.0186
416.50
1092 0.0251
412.70
136.99 0.0031
414.00
474.30 0.0109
415.30
836.80 0.0192
416.60
1104 0.0253
412.80
159.35 0.0037
414.10
502.66 0.0115
415.40
862.66 0.0198
416.70
1114 0.0256
412.90
182.56 0.0042
414.20
531.10 0.0122
415.50
887.97 0.0204
416.80
1119 0.0257
413.00
206.55 0.0047
414.30
559.60 0.0128
415.60
912.65 0.0210
Stormwater Conveyance Calculation
Turnberry Lane Condominiums
July 18, 1997
Revised December 29,1997
Washington Land Design
Planning a Engineering
Project: 2CFw Date: -7, 11YI-7
Description: B y: L-IF)t—
S7-VreI-I AWMV S-X-w-W%b -0 IFAB 140-M- 241t.-
C40
A4 VF- VAU'&::&r Ah-'P4--v
.4
F.—,.,L ,, F"" 5- C--�Aax-"
b -7-AAF-
0 - 0. C7,7 ,, -
10700 Meridian Avenue North, Suite 503, Seattle, Washington 98733 (206) 365-9510 Fax: (206) 365-0225
Flow Control Structure Detail
Turnbe-- Lane Condominiums
SOLID COVER
RIM EL 418.0'
2 ) TYPE 2, 54" 0
C- 3 )CATCH BASIN
STEPS OR
LADDER
GASKET (TYP.)
SHEAR CATE
36"0 IN
IE = 411.80
SLEEVE COUPLING
NON7SHRINK GROUT
WELDED STEEL PLATE W/
2.35" DIA. ORIFICE ("l)
ff
7l5TF--;iTiiTE-jjjF=_
TOP OF RISER
= 416.8
2-CALV.STEEL
")TRAPS
2.35" DIA. ORIFICE (#2)
EL = 414.50
(WITH DOWN -TURNED ELBOW)
18" RISER
1 2"MAX.
13"MIN.
12"0 OUT
IE OUT
411.80 FLEXIBLE
ADAPTER
COUPLING
2-GALV.STEEL
STRAPS (TOP
"r r.AND BOTTOM)
L 54" 0
FLOW CONTROL STRUCTURE
SCALE 1"=2'
Coalesing Plate Structure Detail
Tumberry Lane Condominiums
0
F_
L
660-CPS
OIL/ WATER SEPARATOR
7U SO. FT. - EFFECTIVE COALESCING AREA
415 G.P.M. - MAXIMUM PROCESS FLOW
COVER 4'-8"
No. 64-2-342P
-,-7'T-7'T!T!7-
1,200 lbs.
_T'
T -'T-' —T
1- 1!7-'7-'
T-
7 7 --- - - - - - - - - - - - - - - - - -- - --
- - - - --- - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - -- - - - -
- - - - - - - - - - --
- - - - - - - - - -
OUTLET PIPE
WITH SAMPLING TEE - - — - -
BY OTHERS
FIBERGLASS
HOLD-DOWN CHANNEL
BASE ASSEMBLY
No. 660-CPS
6,300 lbs.
6'-0"
OUTLET WEIR
INLET PIPE
WiTH ELBOW
OIL RETAINING BAFFLE
BY OTHERS
�J
6'-0"
COALESING MEDIA
INLET WEIR -
Copyright 1992
* ITEMS SHOWN ARE SUBJECT TO CHANGE
WITHOUT NOTICE.
FOR DETAILS SEE REVERSE SIDE.
123 Issue: Anril 1992
Washington Land Design
Planning Engineering
Project: k/4
Description:
Almm a2se-
Date:
B y: klXg-'
J_� L
'Fel. our
Ai�xx_r'rX7.-Va
F;T�
..A 71*4C.4AEP VPRCLO Z=
%AZU.&E
it
19, AZZ.6 oW
;jj
I44E: CIX-111 ..4r
4-
::5*/oQA
L
, Covne.,ax-
c:
L
.4
RAMA XIV
:'f
-or-
IJA - A hkz=W
C_edpv��, V.PMW_'-T-Ae4..ES-,. .4^40 .4
.44A.4W45
I_aAl -A/
AR" 1r WJQ5 SM
)NM"e-P- A . At_-C41 C;;"VAU> WATV.1Z_ -rdSXE-
e5,epwW oic -1Gj*Pw . 7—am sxr,-=
J12310f AW44 YLACE) A5 A�Abh 6&1W111
A&WE
vj 4,uy b qr o, of.,
;5A...0 WIV, Z-,QWDnZAP-1r. 2w
IVA - eovce_
1Y
10700 Meridian Avenue North, Suite 503, Seattle, Wa7hington %b f33 (206) 365-9510 Fax: (206) 365-0225
50
STORMWATZR MANAGZMENT MANUAL FOR THZ PUGZT SOUND BASIN
SW TY00
M
Hydrok*k SW
Group
3oil Type
Hydrologic Soil
Group
Newbei,
B
spansway
AIB
Ninqually
B
Springdale
B
Nooksmak
C
Suluver
B
No�
CID
Sultan
C
O#arty
C
Sultan variant
B
Ob"
ND
sum"
C
01011110unt
C
swatilown
ND
Olyinpic
B
Tacoome
D
on"
D
Tanwax
ND
Oridia
D
Tea1whit
ND
Orting
ND
Tenino
C
000
C
TLwb
D
Ovall
C
Tokul
ND
Pastik
C
Townsend
C
PbmM
C
Trhoe
ND
Pbska
ND
Tukwila
D
PUchuck
C
Takey
ND
P. W A
C
urnan
variable
Poulabo
C
Vailloc
B
Padw
C
Ve"
C
P""
D
Wapato
ND
Puyallup
B
Walden
B
Quam
ND
Wbidbey
ND
Quikm
ND
Wilkawn
B
Rapm
B
WiL011408
A
Rainier
C
Woodiarille
B
Rau&
B
Y"
C
Road
ND
ZYOW
a I
Hydrologic Soil Group Classifications
A. (Low runoff potential). Soils having high Infiltration rates, even when
thoroughly wetted, and consisting chiefly of deep, well -to -excessively drained
eands or gravels. These soils have a high rate of water transmission.
B. (Moderately low runoff potential). Soils having moderate infiltration rates
when thoroughly wetted, and consisting chiefly of moderately fine to moderately
coarse textures. Theme soils have a moderate rate of water transmission.
C. (Moderately high runoff potential). Soils having slow infiltration rates when
thoroughly wetted, and consisting chiefly of soils with a layer that impedes
downward movement of water, or soils with moderately fine to fine textures.
These soils have a slow rate of water transmission.
D. (High runoff potential). Soils having very slow infiltration rates when
thoroughly wetted and consisting chiefly of clay soils with a high swelling
potential, soils with a permanent high water table, soils with a hardpan or
clay layer at or near the surface, and shallow soiCls over nearly Impervious
material. These soils have a very slow rate of water transmission.
ND Data not currently available for this soil type.
*From SCS, TR-55, Second Edition, June 1986, Exhibit A-1. Revisli-ons made from
SCS, Soil Interpretation Record, Form 15, September 1988 and various county ec"
surveys.
III-1-10 FEBRUMV, im
17. Erosion - and- Sediment- Control ftuirement -
inancial.Lability. Performance bonding, or other
appropriate financial instruments, shall be required
for all projects to ensure compliance with the
approved erosion and sediment control plan.
-Y
M-10-3-TUGM&WEII �0; �-F%
A. Any new development or redevelopment with more than
2,000 square feet of new impervious surfacing shall be
required to provide storm water quality control.'
Compliance will be demonstrated by implementing an
approved Storm Water Site Plan. Guidelines for Storm
Water Site Plans are provided in the manual. The plan
must address the following requirements, in addition to
ESC requirements.
SOC Minimum Muirement - -- Storm water
Deten-tton/Streambank Erosion Control. Storm
water discharges shall control stream bank erosion
and flooding of the downstream Storm system by
limiting the peak rate of runoff from the site. The
predevelopment condition for all cases other than
open water bodies shall be considered meadows or
young second growth forest. As the first priority to
meet this requirement, BMPs shall utilize
infiltration to the Mest extent practicable only if
site conditions are appropriate and ground water
quality is protected. Due to high ground water
tables in large portions of the City and a landslide
complex in the Meadowdale area (where high
ground water increases the slide hazard), there are
few sites within the City where infiltration should
be considered. Exhibit B delineates the areas where
infiltration may be feasible for this requirement if
the site satisfies the requirements outlined in the
Manual. BMPs shall be selected, designed, and
maintained according to the Manual. The minimum
diameter orifice size used for control shall be 5/8 of
an inch. In the case of redevelopment, this
requirement shall apply only. to that portion of the
site that is being redeveloped. Any development or
redevelopment that has less than 5,000 square feet
89948.4 -13-
STORMWATZR MANAGEMENT MANUAL FOR THE PUGET SOUND BASIN
Table 111-1.3 SCS Western Washington Runoff Curve Numbers
(Published by SCS in 1962) Runoff curve numbers for selected agricultural,
suburban and urban
land use for Tvne 1A rainfall distribution. 24-hour storm duration.
LAND USE DESCRIPTION
CURVE
NUMBERS BY
HYDROLOGIC
SOIL GROUP
A
8
C
D
Cultivated land(l)t
winter condition
86
91
94
95
Mountain open areas:
low growing brush grasslands
74
82
89
92
Meadow or pasture:
65
78
85
89
Wood or forest land:
undisturbed
42
64
76
81
Wood or forest land:
young second growth or brush
55
72
81
86
Orc ard:
with cover crop
81
88
92
94
Open spaces, lawns,
parks, golf courses, cemeteries,
landscaping.
Good condition:
grass cover on 05% of the
68
80
86
90
area
Fair condition:
grass cover on 50-75% of
77
85
90
92
the area
Gravel roads & parking lots:
76
85
89
91
Dirt road's & parking
lots:
72
82
87
89
Impervious surfaces,
pavement, roofs etc.
98
98
98
98
Open water bodies:
lakes, wetlands, ponds etc.
100
100
100
100
Single family residential(2):
Dwelling Unit/Gross
Acre %Impervioue(3)
Separate
curve
number
1.0 DU/GA
15
shall
be
selected for
1.5 DU/GA
20
pervious
& impervious
2.0 DU/GA
25
portions
of the
site
2.5 DU/GA
30
or basin
3.0 DU/GA
34
3.5 DU/GA
38
4.0 DU/GA
42
4.5 DU/GA
46
5.0 DU/GA
48
5.5 DU/GA
50
6.0 DU/GA
52
6.5 DU/GA
54
7.0 DU/GA
56
PUD's, condos, apartments, %impervious
commercial businesses must be
industrial areas
computed
(1) For a more detailed description of agricultural land use curve numbers refer
to National Engineering Handbook, Sec. 4, Hydrolo4y, Chapter 9, August 1972.
(2) Assumes roof and driveway runoff is directed into street/storm system.
(3) The remaining pervious areas (lawn) are considered to be in good
condition for these curve numbers.
111-1-12 FEBRUARY, 19§7
EXHIBIT B
CltY 01 Edmonds
0
Washington Land Design
Planning * Engineering
Project:
Description: 7;,7419: CW e:�WOWTXWMW'4
7
Date: 121;�VI77
B y:
A)
V
5
05' '�7. 139
C, 3�4 Ae- 12, -25
10700 Meridian Avenue North, Suite 503, Seattle, Washington 98133 (206) 365-9510 Fax: (206) 365-0225
Washington Land Design
Planning Engineering
Project:
Description: 77;,:,vz o)=
0
Date: / Z/-M/ll 7
By: t—.j:F-
ff� /— — 25-0'
I n -
IU/U0 Mendian Avenue North, Suite 503, Seattle, Washington 98133 (206) 365-9510 Fax: (206) 365-0225
07
SV
q!T, I rn 9
H VA
CA
"qo
fv)-t
t0#1107
PW
1E
<
FTT
Q+ )JPQ)
QJVA JIWAQ
1�,
V,
Fj � Y lh
z4-V SIR
city of Edn�nds Permit No:
RIGHT-OF-WAV CONSTRUCTION PERMIT Issue. Date:
A. Address or Vicinity of Construction: 20800 72ND AAA
M&TM RRT_qqwrMr rpTR-TW 2 y A fqlFp
B. Type of Work (be specific):
ORDER # 107006604 2TL05ZRU LAW,.,,
MKD DEVE"ENENf�R?
C. Contractor: PUGET SOUND ENERG31 Contact: 'R�
Mailing Address: ILIL22 75TH ST. SW, EVERFTT ��4?03PIione: 4215656�-7512"r.-'
State License #: Liability Insurance.— I Bond: $
�/4
D. Building Permit # (if applicable� Side Sewer Permit # (if applicable).
E. Commercial Subdivision Q-0jy r7jp�i E] EUC- (PUD GTE PSEvCHAMBERS. Q'VWD).
Oth
E] Multi -Family Single Family'.. F .,.er.
INSPECTOR.
F. PAVEMENT: YES n NO G. SIZE OF CUT 2 x 4 H. Charge $
CONCRETE CUT: E] YES F] NO
APPLICANT TO READ AND SIGN
IDEMNITY.:.- Appli(qqt,understands by his/her. signature to this application helshe holds the City of Edmonds harmlessfrom injuries,
-o -c A -'qhforeseeh�,-thai*�mai�,-b�!th
damages� 7;� lainig of an;�,kind or,.*4gsqrd,#h�� 46ev t7fi&s�en.'k,
q�,4.against.theXity 9f
A..
any of its departments or employees, including but nof limited to e defenseof any tegat proceedings -including Jeje.n.se -c'osts -an'd
attorneyfees by reason ofgranting this permit.
THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A. PERIOD OF, ONE YEAR FOLLOWING THE FINAL
INSPECTION AND ACCEPTANCE OF THE WORK, ESTIMATED RESTORATION FEES WILL BE HELD UNTIL THE FINAL STREET PATCH 1�"
�COMPLETED BY CITY FORCES, AT WHICH TIME A DEBIT OR CREDIT WILL BE PROCESSED FOR ISSUANCE TO THE APPLICANT.
0 Traffic control and public safety shall be in accordance with Cit 4egulations as required by the City Engineer. Every
Y,
flagger must be trained.as required- by .(WAC) 296-155-305 and must have certification verifying completion of the
required training in their possession.
Restoration is to be in accordance with City codes. All street -cut trench Work shall be.p�atched with asphalt or City -
a proved material prior to the end of the workday — NO EXCEPTIONS.
p
Th�ee sets of construction drawings of proposed work are required with the permit application.
IRAVEREAD TkE ABOVE STATEMENTS AND UNDERSTAND THE PERMIT REQUIREMENTS AND ACKNOWLEDGE
THA T I MUST MAKE THE PINK COPY OF THE PERMIT A VAILABLE ON SITE A T ALL TIMES FOR INSPECTIONS
Signature: FEEMA H LOI!EZ— 8/24/19!59
Date:
(Contractor or Agent).
CALL DIAL -A -DIG (1-800-424-5555) PRIOR TO BEGINNING WORK
FOR CITY USE ONLY
'70
Approved by: Right-of-way Fee;
Time Authorized: Void After <&otl 10 1 Disruption Fee/Fund 111: '500
Special Conditions: Restoration Fee:
Total Fee: 570!:�--
,n c- -14 1 -n d Receipt No:
A&A(147 Issued by..
A v g_t
A -if J�k
A A4 o 1��
AN ENGINEERING FINAL
UPON COMPLETION OF PERMITTED WORK,
INSPECTION IS REQUIRE!) PER CHAPTER 18.00 OF THE EDMONDS
COMMUN, ITY DEVELOPMENT CODE.
FINAL APPROVAL OF PERMITTED WORK.
INSPECTOR'S SIGNA TURE DATE:
For inspection requirements see Engineering Information Handout.
i. 2
4 i
NO WORK SI-IALL BEGIN PRIOR TO PERNUTISSUANCE
I Or,
Ubt
CITY OF EDMONDS ZONE PERMIT
41" 1 - (� NUMBER
CONSTRUCTION PERMIT APPLICATION C, Z,0�t o ' w SUITEJAPT #
OWNER NAME/NAME OF BUSINESS ADDRESS
0
AfKD tt-- VC-UPPRNT LEGAL DESCRIPTION CHECK SUBDIVISION NO. LID NO.
MAILING ADDRESS I 1�*
cr)2 0 N .1 . * t" / / 0
PUBLIC RIGHT 0 AY PER OFFICIAL STREET MAP TESCP Approved J�,5 19
CITY ZIP 7E�EPHONE NUMBER R AW Permit Required kfj�f�\
7 EXISTING EQUIRED DEDICATION 4: Street Use Permit Req'd 0
er_wk V Vf_�, I tVA q CN% 41 _V.5 -4 le"Im 0 PROPOSED ��461_ 1 Inspection Required Y6510
NAME I Sidewalk Required �&S# o::
METER SIZE LINE SIZE NO. OF FIXTURES PRV REQUIRED
ADDRESS YES NO 0
V 0
REMARKS Z
CITY ZIP I TELEPHONE NUMBER w
_614 d i' i
Z
W, 11!6161 K?co '1112 n3q 3
NAME';
01VNM
ADDRESS r
ENGINEERING MEMO D ATED REVIEWED BY
CITY ZIP TELEPHONE NUMBER IIIIIII -711t1qi I
STATE LICENSE NUMBER
MKDr,+_7T -2
EXPI ATION DATE
'INS,
R-) - I -L - -13
J16)
I
VARIANCE OR CU
ADB #
SHORELINE N
Legal Description of Property - include all easemerits
9e� —,f 50
SEPA REVIEW
COMPLETE EXEMPT
SIGN AREA
ALLOWED PROPOSED
HEIGHT
ALLOWED PROPOSED
IIAM
A/
EXID ke%�
I
45,1- 4_�
LOT COVERAGE
ALLOWED ED
REQUIRED SETBACKS (Fr.)
FRONT SIDE REAR
PROPOSED SETBACKS (FT.)
FRONT UR SIDE�,_REAR
�PROPOS,/
0
4D
10. 11
5
/5' '/D'
ji Property oco CK:� E7, 0 tot)
O-Z of
LOT AREA
LAN G REVIEW BY
I j
07T E
Th.
fV__1
REMARKS'
EW RESIDENTIAL
V� PLUMBING(MECH
P
El ADDITION COMMERCIAL
COMPLIANCE OR
CHANGE OF USE
RAPT. BLDG.
REMODEL
SIGN
CHECKED BY
TYPE OF CONSTRU TO
I V- 4-
CODE--
OCCUPANT
GROUP
GRADING FENCE
El El
REPAIR' — CYDS.
x —FT)
)
WOODSTOVE
DEMOLISH INSERT
SWIM POOL
HOT TUB/SPA
SPECIAL INSPECTOR
REQUIRED
Ig
- 11311- Igo
i TP
CC ANT
6 'd
LOAD_)M
GARAGE RETAINING WALL/
CARPORT ROCKERY
jo, "
RENEWAL
YES
"4
11211 2
F
1
REMARKS
I ' 3Zb
PROGRESS INSPECTIONS
P R LIBC/1
-=I (TYPE OF USE. BUSINESS OR A9TIVfTY) TPLAIN:
NUMBER
OF
STORIES
NUMBER OF
DWELLING
I UNITS 11 .
CRITICAL
AREAS
INUMBERq6Vf(D
DESCRIBE WORK TO BE DONE (ATTACH PLOT PLAN)
I 'VIVrt e61VP()H1A11Uk4
FINAL INSPE CTION / REOUIRED
bu-111tVA
VALUATION
FEE
EJE
PLAN CHECK FEE
BUILDING
5 L)
HEAT SOURCE:
OR 11
GLAZING-
%
PLUMBING
Plan Check No.
MECHANICAL
GRADINGIFILL
This Permit covers work to be done on private property ONLY.
Any construction on the public domain (curbs, sidewpiks,
driveways, marquees, etc.) will require separate permission.
STATE SURCHARGE
Permit Application: 180 Days
Permit Limit: 1 Year - Provided Work Is Started Within 180 Days
STORM DRAINAGE FEE
ENG. INSPECTION FEE
"Applicant, on behalf of his or her spouse, heirs, assigns and
successors in interest, agrees to indemnify, defend and hold
harmless the City of Edmonds, Washington, its officials,
employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance
of this permit. Issuance of this permit shall not be deemed to
modify, waive or reduce any requirement of any city ordinance
nor I.imit in any way the City's ability to enforce any ordinance
provision."
PLAN CHECK DEPOSIT
TOTAL AMOUNT DUE
�0 owe
I hereby acKnowleug that I ave rea . F]J .. � . �
information given is correct; and that I am the owner, or the duly
ATTENTION
APPLICATION APPROVAL
authorized agent of the owner. I agree to comply with city and
THIS PERMIT
T his application is not a permit until
state laws regulating construction; and In doing the work authoriz-
AUTHORIZES
THE
.
signed by the Building Official or his/her
ed thereby, no person will be employed in violation of the Labor
ONLY
is
Code of the State of Wash . ington relating to Workmen's Compensa-
WORK NOTED
Deputy; and fees are paid, and receipt
tior)lnsuranceArici RCW 18.27.
INSPECTION
acknowledged in space provided.
OW ER CPR AGENT) DATE 2IGNE))_
V/A
DEPARTMENT
CITY OF
OFFICI�L' fl'NAT Illy) DATE
7
EDMONDS
CALL FOR
..KY14A
RELEASED BY- CyATE
ATTENTION
INSPECTION
W67
IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE
0
UNTIL A FINAL INSPECTION HAS BEEN. MADE AND APPROVAL OR
771-0220
ORIGINAL - File YELLOW - Inspector
A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC
SECTION 109
PINK - Owner GOLD - Assessor
0
MAs.
CITY OF EDMONDS
USE PERMIT
ZONE
NUMBER
CONSTRUCTION PERMIT APPLICATION
joe
AUUHL5S SUITE/APT ir
OWNER NAME NAME OF BUSINESS
�DESCRIPTION
EGAL CHECK
B01VISION No.
LID NO
MAILIffG_ ADORE SS
Z
PUBLIC RIGHT OF WAY PER OFFICIAL STAIEE� MAP.
TESCP Approved 11
RW Permit Required 13
0
CITY- V ZIP
TELEPHONE NUMBER
�S��4 - C'�i
EXISTING — REQUIRED DEDICATION
PROPOSED
Street Use Permit Req'o 11
Inspection Required 13
Sidewalk Required 0
a:
NAME
METER SIZE
LINE SIZE
NO. OF FIXTURES
W
PRV REQUIRED
YES 0 NO 0
L) ADDRESS
REMARKS Z
L)
RE
W
CITY zip
TELEPHONE NUMBER
Z
W
NAME
(\.\ Vd—
cc ADDRESS
ENGINEERING MEMO DATED
I-
0
S4'4&+ A— o
U I C)
cc ZIP
NUMBER
,
Z
[TELEPHONE
IRE MEMO DATED REVIEWED BY
0 V/
313—
STATE LICENSE NUMBER EXPNATION DATE
4
VARIANCE OR CU
ADB#
SHORELINE #
LePTIesbTio5oh of Property - 6!zide all easi��n�)B�ht't T k4
SEPA REVIEW
SIGN AREA
HEIGHT
Z
COMPLETE I EXEMPT
ALLOWED PROPOSED
ALLOWED I PROPOSED
A, z�
CC
EX
— --I
U sp�_ ; a
I(; f 0 � I J-�Q k � _1
U) Q
LOT COVERAGE
ALLOWED PROPOSED
REQUIRED SETBACKS (FT.)
FRONT SIDE REAR
, ,
PROPOSED SETBACKS (Fr.)
FRONT UR SIDE REAR
0
�
Z
Z
W 77romrty
LOT AREA
PLANNING REVIEW BY
DATE
Tax Account
Parcel No.
NEW RESIDENTIAL PLUMBING/MECH
REMARKS
COMPLIANCE OR
ADDITION COMMERCIAL CHANGE OF USE
APT. BLDG.
REMODEL SIGN
HECKED BY
TYPE OF CONSTRUCTION
Cd--)E
OCCUPANT
GROUP,
EIREPAIR 1:1 GRADING FENCE
CYDS. 11 x —FT)
wOODSTOVE
E] DEMOLISH INSERT SWIM POOL
11 F HOT
S
SPECIAL INSPECTOR
AREA
TUB/SPA
JR
F
REQUIRED
OYES
LOAD
GARAGE RETAINING WALL/
CARPORT ROCKERY RENEWAL
REMARKS
PROGRESS INSPECTIONS PER UBC 108 Z
(TYPE OF USE. BUSINESS OR ACTIVITY) EXPLAIN:
D
CF C9
W NUIMBER
NUMBER OF
'RITICAL
a OF
DWELLING
AREAS
(00 STORIES
UNITS
NUMBER
DESCRIBE WORK TO BE DONE (ATTACH PL& PLAN)
FINAL INSPECTION
REQUIRED
uk On L, _Cm/ C
PLAN CHECK FEE
BUILDING
HEAT SOURCE:
—
GLAZING
PLUMBING
Plan Check No.
MECHANICAL
This Permit covers work to be done on private property ONLY.
GRADINGIFILL
Any construction on the public domain (curbs, sidewalks,
driveways, marquees, etc.) will require separate permission.
STATE SURCHARGE
Permit Application: 180 Days
Permit Limit: I Year - Provided Work is Started Within 180 Days
STORM DRAINAGE FEE
"Applicant, on behalf of his or her spouse, heirs, assigns and
ENG. INSPECTION FEE
successors in interest, agrees to indemnify, defend and hold
harmless the City of Edmonds, Washington, its officials,
employees, and agents from any and all claims for damages of
cr
whatever nature, arising directly or indirectly from the issuance
of this permit. Issuance of this permit shall not be deemed to
PLAN CHECK DEPOSIT
modify, waive or reduce any requirement of any city ordinance
0
X
nor limit in any way the City's ability to enforce any ordinance
TOTAL AMOUNT DUE
provision."
I hereby acknowledge that I have read this application; that the
information given is correct; and that I am the owner, or the duly
ATTENTION
APPLICATION APPROVAL
authorized agent of the owner. I agree to comply with city and
state laws regulating construction; and in doing the work authoriz-
THIS PERMIT
AUTHORIZES
This application is not a permit until
ed thereby, no person will be employed in violation of the Labor
ONLY THE
signed by the Building Official or his/her
Code of the State of Washington relsitip I g to Workmen's Compensa-
WORK NOTED
Deputy; and fees are paid, ana receipt is
tion Insdrailce aria RCW 18.27.
T
INSPECTION
acknowledged in space provioea.
SIGN�'I`�RE NER 07 N71.) DATE SIGNE
7
DEPARTMENT
CITY OF
OFFIC AL'S §dGN!TUqE
A ) --,/-
� --, - , 7
EDMONDS
/ k,
N
ATTENTION
CALL FOR
Rtr�lfi) BY
INSPECTION
IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE
UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR
771-0220
ORIGINAL — F:i;a YEELLOV.'
A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC
— ins--ector
SECTION 109
PINK — 0-,,.r.er GCL-D — �sSessor
102-87
CITY OF EDMONDS
USE
ZONE Fin PERMIT
—NUMBER
CONSTRUCTION PERMIT APPLICATI N
i OB SUITE/APT #
OWNER NAME/NAME OF BUSINESS
ADDRESS
;�txuz. -�-z
i
Mgt) Pr71VFt0PNbNT
LEGAL DESCRIPTION CHECK
SUBDIVISION NO.
LID NO.
W
Z
01:
MAILING ADDRESS
/W20/&_ _48110
"I J-00
TESCP Approved
PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP.
CITY VO4 ZIP
A
TELEPHONE NUMBER
124,r) 49t
EXISTING — REQUIRED DEDICATION
RW Permit Required
Street Use Permit Req'd
)SED
.SPection Required �0"
Sidewalk Required "
NAMP
METER *SIZE
LINESIZE
NO. OF FIXTURES
-19
PRV REQUIRED
uj
LU
A
DT16 4 5.
R RKS
0
YES Noo
0
IOU �LeI04�,
W
��ICITY
ZIP--7i—ELEPHONE
NUMBER
,049ft kA 16
Pbtlq)
4`23 03473
NAME
Z.
OwNbps
cc
ADDRESS
0
ENGINEERING MEMO DATED REVIEWED BY
CITY Zip
TELEPHONE NUMBER
Z
1
FIRE MEMO DATED REVIEWED BY
0
cc
VARIANCE OR CU ADB# SHORELINE#
(9/1-/15-0
STATE LICENSE NUMBER EXPIRATION DATE
r)w qlqg�
Legal Description of Property - include all easements ,
—SIGN
Z
SEPA REVIEW
COMPLETE
EXEMPT
ALLOWED
AREA
PROPOSED
HEIGHT
ALLOWED
j PROPOS�D
0
EXP
I NOR
5
cc
0
0
LOT COVERAGE
REOUIRED SETBACKS (Fr.)
PROPOSED SETBACKS (FT.)
Lu
ALLOWED I PROPOSED
1.401"
FRONT SIDE REAR
FRONT UR SIDE REAR
/0 /5
ZZ
Lu
_j
Property 006 0cf - 0/0 7
L OT AREA
PLAN IEWBY.
p5
/DATE
Tax Account
P3Po - 600,00s
7!)
Parcel No. i o goe)
11[2_—PLUMBINGIMECH
REMARKS
Y'NEW
RESIDENTIAL
COMPLIANCE OR
El
DDITION
COMMERCIAL
CHANGE OF USE
REMODEL
APT. BLDG.
El SIGN
FENCE
HECKED BY
TYPE OF CONSTRUCTION
1
C00—
(4+_
OCCUFANT
GROU
REPAIR X—M
DEMOLISH VOODSTOVEW SWIM POOL
INSERT HOT TUB/SPA
El I "ej � [i
_ I 4e
10 V _11/W,
SPECIAL INSPECTOR
hF,� -34
F,1 M
OC9UPANT
1,
GARAGE RETAINING WALL/
CARPORT El ROCKERY RENEWAL
KA
REQUIRED LOAI)I,e�;,
I
d—YES IM-7 Coo A-020
—MARKS
1,
Z
0
(TYPL OF USE, BUSIVESS OR ACTIVITY) EXPLAIN:
PROGRESS INSPFCTInwS PEW
Ex
uj
0
NUMBER
OF
NUMBER Of
DWELLING
Ct
CR TICAL
AREAS
IN
03
STORIES
UNITS
0
DESCRIBE WORK To BE DONE (ATTACH PLOT PLAN)
q - CaND INJUM
jytw
FINAL INSPECTION
REQUIRED
r1V
VALUATIO N
FEE
PLAN CHECK FEE
BUILDING
HEAT SOURCE:
tcj�e
GLAZING
I > %
I
PLUMBING
14
Plan Check No. 17a, 7
MECHANICAL
GRADING/FILL
-75
This Permit covers work to be done on private property ONLY.
Any construction on the public domain (curbs� sidewinlks,
_D
driveways, marquees, etc.) will require separate permission.
STATE SURCHARGE
Permit Application: 180 Days
Permit Limit: 1 Year - Provided Work Is Started Within 180 Days
STORM DRAINAGE FEE
"Applicant, on behalf of his or her spouse, heirs, assigns and
ENG. INSPECTION FEE
successors in interest, agrees to indemnify, defend and hold
harmless the City of Edmonds, Washington, its officials,
employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the Issuance
of this permit. issuance of this permit shall not be deemed to
PLAN CHECK DEPOSIT
0
modify, waive or reduce any requirement of any city ordinance
-V
nor limit in any way the City's ability to enforce any ordinance
TOTAL AMOUNT DUE
-5 V
R'? 1
provision.
I hereby acknowledge that I have read this application; that the
ATTENTION
APPLICATION APPROVAL
information -given is correct; and that I am the owner, dr the duly
authorized agent of the owner. I agree to comply with city and
state laws regulating construction; and in doing the work authoriz.
THIS PERMIT
A . UTHORIZES
This application is not a permit until
ed thereby, no person will be employed in violation of the Labor
ONLY THE 0
signed by the Building Official or his/her
Code of the State of Washington relating to Workmen's Compensa-
WORK NOTED
Deputy; and fees are paid, and receipt is
tion,hirtsurani;e arig RCW 18.27.
INSPECTION
acknowledged in space provided.
SI E AGENT) OAT
DEPARTMENT
OFFJCI V -SIGIAb RE DATE
Uff—WIMN 7
CITY OF
EDMONDS
Z�//
,W
IX6NA
ATTENTION
CALL FOR
INSPECTION
DATE
�
IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE
UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR
i
771-0220 ORIGINAL — File YELLOW — Inspector
A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC
SECTION 109
PINK — Owner GOLD — Assessor
C...n
IM
GRAPHIC SCALE
,wgm
'saw, "';'a
a
( IN FEET )
1 Inch = 20 ft.
S1311,4
J/
E
IZ I,,
VI
7i
0
... ..... .....
-77
1M
-208TH STREET S.W.
EXISTING LEGEND PROPOSED LEGEND:
'CIV
16
"--SEr"ARCH. _.FQR
TLANS,
RD6-CONNLCTIONS
1.5
,
0
4175
BUILDING A-2
BuLDING A
FF 417.5
FF 417.5
-0
�412'5
411 .0
411-5
ORAip.j
t
A,,DRAI
ARE� N
CONNEbI70,,
4" PVC
..........
I
TO STORM " 21 - --------
420
@ 1.0%
N
411-5
AREA DRAIN
417.5
I
"175
"t1> .
41? . i �� 1* `'
�; I _ AREA DRAIN
i
CONNECT TO
CONNECT TO fl 6
SD 412"d CT
417.5
17
4' PVC
4" PVC
1 Af
V1 I
@ 1.0% 417.5
RDL
@ 1.0%
C.O.
417.0-
IE 416.75
_\ X-��v
Fifil
A 4 In L Ali
YARD DRAIN-
T I Ij
L�j
1 �TYPE I CATCH 13ASIN
4 PV THR J 13311.1 C f
C
(TYP.) 4,? 4F j C
��w
7.2 11-.7
9
11 � Ps
,w-m
L �0
UILDING C
F r
416.25 FF 417.67
Cn Co
Im
NO.
DATE
BY
REVISION DESCRIPTION
4/8/98
BUILDING 'A' REDESIGN
12/12/97
SECOND REVIEW
10/28/97
--f-
CITY COMMENTS
,__T8/4/97
PERMIT SUBMITTAL
wll�mmg�m
"Li6"
RDL
@ 0.5%, TYP.
6]
F
BUILDING Di
FF 418.25
lb
5�
00
N.
418
418.2
C7
SEE SHE_-_T C-5 .1FOR
I --STORY STORM ERAINA3%
WOOD FRAME EXTENTICN -INFOR ATION,
UL�)IUNLU UY:
WFF
ISSUE DATE:',
R. %" -
WA
Washington Land Design
10/28/97
Nt.
Planning & Engineering
DRAWN BY:
PROJECT NO.0
BF
9709 Third Avenue N. E., Suite 203
CHECKED BY:
977711
32 19
is
Seattle, WA 98115
JRG
T.
(206) 522-9510 FAX (206) 522-3344
- wwvv" I I
EXPUM JRY 7, 1998
.... ......
j. j
A
I i
-STRUCTURE SCHEDULE
CB#
TYPE
RIM
IE (OUT)
0
1
417.0
413.7
1
417.1
413.0
if
417.5
412.5
11
417.6
412.3
417.9
412.0
418.35
411.8
FLOW CNTL STR.*
417.7
411.8
415.8
413.0
416.9
412.5
YARD DRAIN
416.8
1
417.2
413'.5
* SOLID LOCKING LID
PIPE SCHEDULE
PIPE #
DIAMETER
LENGTH
(FT.)
SLOPE
(FT./FT.)
8
11
0.064
8"
88
0.005
8"
36
0.005
12"
55
0,005
12"
46
0.005
60"
55
0.000
12"
5
0.005
8"
95
0.005
8"
26
0.007
8"
40
0.013
6"
40
0.081
6"
101
0.037
5A
SPOT ELEVATION
PROPOSED CONTOUR
RIDGE LINE
TYPE I CATCH BASIN 1
C-3
QD
TYPE 11 CATCH BASIN
YARD DRAIN
TRENCH DRAIN PER UTILITY VAULT CO.
STORM DRAIN PIPE
NOTES:
1. THE DESIGN SHOWN IS BASED UPON THE ENGINEER'S UNDERSTANDING
OF THE EXISTING CONDITIONS. THIS PLAN DOES NOT REPRESENT A
DETAILED FIELD SURVEY. THE EXISTING CONDITIONS SHOWN ON THIS
PLAN SHEET ARE BASED UPON THE SURVEY FOR SCHOEDER ARCHITECTSAIA,
PREPARED BY HEBRANK, STEADMAN & ASSOCIATES, P.S. DATED
DECEMBER 1996. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING
FIELD CONDITIONS PRIOR TO BIDDING THE PROPOSED SITEWORK IMPROVEMENTS.
IF CONFLICTS ARE DISCOVERED, THE CONTRACTOR SHALL NOTIFY THE
OWNER PRIOR TO INSTALLATION OF ANY PORTION OF THE SITEWORK
WHICH WOULD BE AFFECTED.
2. THE SPOT ELEVATION INDICATED ON THIS PLAN REPRESENT THE
DESIGN TOP -OF -ASPHALT GRADE, UNLESS OTHERWISE INDICATED.
3. ALL UNSURFACED AREAS ARE TO RECEIVE FOUR INCHES
OF TOPSOIL, SEED, MULCH AND WATERED UNTIL A
HEALTHY STAND OF GRASS IS OBTAINED.
4. ALL CATCH BASINS AND AREA DRAINS ARE TO BE SITUATED
SUCH THAT THE OUTSIDE EDGE OF GRATE FRAME IS AT TOE
OF CURB (WHERE APPLICABLE).
5. CONTRACTOR TO GRADE ALL AREAS TO PRECLUDE THE
PONDING OF WATER.
6. STORM DRAINAGE PIPE WITH LESS THAN 2'-0" COVER
SHALL BE CLASS IV REINFORCED CONCRETE PIPE,
OR APPROVED EQUAL TO SUSTAIN H-20 LOADING.
7. ALL ONSITE STORM DRAINAGE PIPE SHALL BE SMOOTH WALLED INTERIOR,
MANUFACTURER'S VERIFICATION OF MANNING'S ROUGHNESS
COEFFICIENT n=0.012 OR LESS. ADS N-12 IS NOT TO BE USED.
8. CATCH BASIN INLET PROTECTION / EROSION CONTROL TO BE
USED FOR ALL NEW INLETS.
9. CONTRACTOR TO CONNECT ROOF DRAIN LEADERS TO PROPOSED
STORM DRAINS AS SHOWN.
10. CONTRACTOR TO REMOVE UNSUITABLE SOILS LOCATED WITHIN THE
BUILDING SPLAY LINE OF THE FOOTINGS.
11. THE CONTRACTOR SHALL COORDINATE WITH PUGET SOUND ENERGY SERVICES
�N0 WORK IN THE AREA OF THE EXISTING 12" GAS UNE IN 72ND AVENUE W.
OT SHOWN ON SURVEY)
CAUTION - NOTICE TO CONTRACTOR
THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT
THE LOCATION AND/OR ELEVATION OF EXISTING
UTILITIES AS SHOWN ON THESE PLANS IS BASED
ON RECORDS OF THE VARIOUS UTILITY COMPANIES
AND AVAILABLE AS -BUILT INFORMATION. THE
. .. .... INFORMATION IS NOT TO BE RELIED ON AS
BEING EXACT OR COMPLETE. THE CONTRACTOR
MUST CALL THE APPROPRIATE UTILITY COMPANY AT
LEAST 48 HOURS BEFORE ANY EXCAVATION TO
VN REQUEST EXACT FIELD LOCATION OF UTILITIES. IT
SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR
TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT
WITH THE PROPOSED IMPROVEMENTS SHOWN ON
V I THESE PLANS.
TURNBERRY LANE CONDOMINIUMS
EDMONDS, WASHINGTON GRADING AND DRAINAGE PLAN
I
(
"I
..
11
_
r,
(,I'
CA
C
U.
�"..
V
1�_,
W.-
�
�._;�41
�11
cz.
C
...,
C-1,
C�
C,
��.-:,:
X.,
C -`,
. ..... "
i,*56
.,
_
.,
.-
,
11) IJ
C-)
R,
, _
.3
-�!�7,
� �_,
C
; ,.,,,jl
_.�,'
.
. -
t _', )
i
�_
(I -,)
,
ux.j,
_
. 1_.)
fl.,
"
.. I... .. . - 1- I-. I . I-. . . .
. '_ I � ,�' . !
.ir, 3;____ _.n!� __ -� � 11
� . � - �)
,-, � 'A , .;,,�7 ,_�,_ ...... ,
I 1.1 1�,j_i` . 4, , %.: �'.� '.., , .r Q ,,.,' � � . i f
� � - - - -� � ...... I �.
; �
. ;� I I,""", � ".,(, ..
.
� � ;,. I _; Z,. i 1% ! I � ��: . ",�J)AY " i
i �. - "
; ly
, . F_ S,6q3"T, _,� �i.j�3",-
- 4 ,
1 � f �,,<, 7 ., ., _'.. "
.;�, � , j 1,�
I I .1-11 � I I . I " I �",'j)l 11 If
! ,�,,, - .I., .� -0 .
.
11
;
,�
.
L 11 I I
I � ,ij , � 'r
."..; ..
_� I ,
.� 0"I". _ ,f � ., I 4 % 4[ !� . � . . _ .1
- "I i ., - , ,
i I_, - �;l i? - �,, ? r _�, ; i., - -, i,; , , 1 't, _ '1111.N11
. , � - _.
> t � 11; I , � � , ; F, % ; % I ,il,�\, .1 ..
- .1 I . I - . � '. 1 , i�i i !"i �
, i, I
, �, . I . .,
- �.� . _ Z.
. . i
NGF-,',"�j I.- ,,, � j ��, . 1, , I " i�..,,
Vjl_ *,.-' 1�
.1-1.1 .11-, , �
. � �
" 'i I . -
� _,_1j..,_i
I
il
.
�
.:', I �:..
� .
.-
, ; -
11. '. I � ,,
.. 1, -
�� ", ,
I im, -
_. t _. I., ,
I I , � ,1, ;-* - 1 ,'- .. i. . I . ,-.I
, L 11:, � , i�', J, .-:ri
�.\.� � j'.. i ". I �, !_ ,� f ... I I.. I,-, 1. I � " 1
. i �, ' %.. ',�i, I I ,�' " ill, I i � wi-.".
I _ � ,, T : -, 1, I ',._�,,
'. . ': , t 1 - ;11 ,!_ ."!
, ,-,!!, , r` . I I
,� i i�.,,
,�2; __
._ ."', -
I- �;,�� 1."', .
I : j �
I
1-;'c�.',, - - - i : __ . . ..... 11 . ... .... I �
, 1,
; .1 ... _ 11-1 ;Q kl�ii�gc - - -.,.-,...
", ! I I "
�
_ _ _..., _ 1' ! . ........ � , * - .� � , f I .
I 11 ", �
.... ........ ... .... .. .. ..... � ... I- �, i -.----. - _-.11-- ........ __ I � 11. -.11-11-- _ , . I . , �,
I. " _ __ _ -- - : i .. __. ___'. .111, � j ; , .. � . I -
� �, � -, ." - � - .- - -
. ;
� i
� i
I., 1 . .".- 11 -1
- -
1; &
t �,
." �
" � -_
. ,
1. I 1 .1.1_ -I....
.
i �
1, 1, "
� �. J � I . .1 .... 11.11--...1. -','-,�,,,,-.r:_ .............. ......... �- �
I . - . 1't ;', ...�
I , , :, " , _ ;. � ...
I t ..... . ; . , "4 r-11, r / . I , �, ...., ,.- , i � I .1 11 I I., _j.. i-, tj -"'-
I � , , , ,4 ,-, '. I . ! � Z� 1*� f", , F." i . ; _ , , � � j� .
- s I , . 1 , ; f " t �1 - I - ; ! . � ,_ ... , I �'
� - � " ; , f � i � I
. ..... _.. '.___:,. _...1-- . __1.___.. - _11., . I I _ _., , I- ;, �: �, - .
1.111.1 ", � ... � , "I., I x. 11 I_ I . , i ,. " ,Z, " � : il
1�. 1--....11- �..___ .- . , ". I i . . I I
, �_. . . 1� � I.; � � ; I i
1; 1. ... I
i .- . .- 11
1 ,,,
- "-'--- ,;
-
i ,
- , ___,. - , .
. .)
. i
------ � ,
, - - .- - f 1: - - -1-1.
- L.
,I IV -,
1. 1. _
�'
,1-
, , .,p ,,,�fq
, 'i 1, ,
_ I'll, L... 1 I
11.� . ,: 1,5 . ........ .... _ .
�, " Z� � ,�,
,.�i , - _T""�',
. ,t , - s , �7 4 , ,i,; . ",-*.i -
. , ,
_ r-1 , ; -,
- , _�_ - t 4'
I F, i.:,., ,:F
i .__ ,
I 'i i ; �'..,' , " -
I
I ,. It' -, " " , -,,
. I "..",%
CONNECT TO'EX,:,'Ss �-
j � 11, -
q I ,I
. ;
I ! . -
�1. �� I Q
� 1� � 1 _
� I 1
%
N "
. � t.
ill,
I , .
. . .. . . .1 I I. 7 -1 .1111
,� I .. . ___11 _ " . __ . . __
, "
811 �
, ss C.O.
, .
I '
I I—- ... *
17 1 iA
�, , v I ,_
. i
'. _ -pll� I
, " 'V., `
" flil%iG
"i IE = 412.24 208TH STREET S.xA/
- 1. ..
i : . .1
-1. .-I.. .---,. -
...... : �.
, � 1,1
, , "_. Fl;_.� ,;,�t
.-I ; t- 1i
, -
. 1 -, , - . . . _. .- _ �_ -,
i
! ; i
i I
i i i
t � j
.
IE=410.20 (W) 1,
-
" _' `
I �
1. , --:t
� � %_11
. ,I
, 1� I ,
, . . I.,
__ __ ......... . .. � ...... . _ �
_ am
. � v v 0
".11 I.. �
; -A IC1.1 '�'�_
�'. ,. _ -I- �
i t_ '' 11" i"''C; 1 , �
'. " . .7 4 t .. t irl I . ", _ . ,,"
DDCV AND FDC PER CITY OF , , :.� . I .1 I I
4 -
111-__ .. ..... ___ to '64, - '� "' ,
...... � ...... , f �,
i:_;:�, '' - . -
% j I �
i
.
I t,
itjp�.!
!4, �,!1t'A1_1Hf:1_1
_. .
. r, ,
f � 1_`11 - �
. .
t . . J-_tim.!
I
�
i i
� z . i
% I
� .
CHANNELIZE TO - '.
I
,�-, -
I- , ,:'I,-
.. � ,
I �,
.1 ,w :
.11.,". 11:.
, � ��t . � I 1 ��
.- I I ' i ;�,_
, . - 1 11 .; i !, �.r
i =4.,.x .,. -TEQ I - I _.1... :-:. , m:_.��.
b", .
,-, "... � . I "I., .
M I i.,
JED ONDS-'ST�NQA S- - E�A , _' 1-1 �,_., '' � �: 0 I., f -
S NT
-R ,,� _y
- 1 ;
- "'
, ""' - "'
; I i
_�A_.
"'.
1, I
FLOW EAST � ,
;
I .,
% 7�11M -,I 4-C.:; ...... Cj-_:_.__
�_. _.
.
z " ".1
.., ,
,
�
� , -F -,.- _0 . -
.... 11 1..._1__ . ; . , Pl� i
_1__....._ ........... . ... 11;=:: �- - �
- .i
,�.. a. -, , - "�`,i TE.,',,':-,,V
. I �il 1_.1 .;_:.-!: _,,__,.-,;_-_1 __GA ...ALVE(FxMJ).,,....,,.,.,.,:,,,,,,,, .. ... . ... i:,_i,,,;:.'_..; .. ..... ��;j ...... :,_,", ". ..
1. T 'i -
i - - __';:_
, PR
RE QVIQEI)79�MC,
K,
i . i ;
. i
t
i
7 ....".1_ _-
; �,
. .. -
� I 5
i
11
11 ,-..-. ... .I......
"Ic .,
IE=410.40 (E) , ,
I , . ,
ii, .. .---...-; ,1
I , , %
,.
� - I _ I -.-,.. -
ji I "'T, .1.
-, 11 ... 11. ,�,.- --,--.--.,-- "--.------- , '' 1 ... �. , ;s ,� . .. ..... �
� I '_'-;1__.__.____..
�f . .. :, �,
e . 1H __ - -..--
4
"".., -
� '!' -I. -,,� �
", " _. _ ! t'. - � "'; " ! `� � � ----
__ - _)�j! :�, �:� ,THRUST'BLOck I.; ,,%, . ..... : . ,� .
I ___-_____1_____._'_ .."...__
-- --- - ---- -- - --- -_ -
zi� ... I——
.", i
- �,��', -- - - - - j
111.7 I
'im". _._.._..1. -,. I
-1.1
1
. ! .1, .1
.."!; ; j, I :'i....
, ., . _.._____ -,.,- "',
"
. I L,
'),- -, -,t� : C, .�', -1 -7-
_', � .. .. d; , -_ _,� I � I
" - 1, _._11
�� _ I,_ �,�*_ �
,"
..... .... ___ - 1_ -- -_ 1, '. . :
__ .. ,- I _. -11
: 1 . � ,
,� 11 , -C, � ! - ., I I—— �, ......... 11-1-1 - - i .11 ,
, )� ,� �. If I ;..�, ,
, i::1 ,_ ......... ... �:_ ..,., ii_ ,, ! 111. -
.- - " 1._ .... _ ...
,. � 1. - _ ,_ _ - -4., - --- .1f...11111 * ..�11_11. , .. __
11, �:i:;, -�p . _ .. e� - - S�___:,11'.._ , ":, . .. �' " " , _'2_7 ,,, "
I �1,1, � .,i S� � 1 �� .. � *Ii,,�.�,i ..... . .. . ... � I—— I 1.
, _ ,...".". 11 T, . �
v .... 5#'q..,.`,
.., - , .. .. '. - - - - .,,,,, -, ) 1 . x 11
� T 1 ,� ,� ; * .. I � . 1. � I - _ - - _.
, 11
�1:11 .. ,
, #
, `,,;�. I i
i
i i
;
�p 1,
� � .
. q�
i " *1 "I
I i .�iil
I
, . . , .
, ..
.1, .
. I -
. 1 i
- I
,
v - , .
� _,� ,� ,, .VALVE(F'M`J)
i,! . .�, , , , ; ___ _ ... 1_1 ,_
, i -
, , . .. e� ' " A -, I 1* I I I I - � ;, I., i � - I ... � __'..".._�.
.
'j" . . , .
I ,� " I,'. 1: i I I '�
. 1.
1.) . .. , .2 F'_ ", 41*"'�' .: .i . :: �.,,
.1 .0. �1, 100 IL ' ' �' 5LF 6 SS
I I . -
"
-, I
� _�,; ,
; �-,��,;, - -
1,
:
- ..
, _. , ,
" - " ji, �
i
It,", ;., -_
I .. ,
__ .1 ...- V �� .1. . __1 ,
. I - 1� - I , '* !:___�,� - L I"-
I .. I � I � A ., .. � . - .... i
ti. D . , .
,vt ':;` - - , I - - - -
.. I "i
1.111 _ _....__ ...
,.-
" ;
. I I
1�,,i�_... .-
" - _
- -1
- , �
I .....
........ . 't ,
.... 1-I.-I., ...... '. ". . ..,
.
% : , = 414.50 81) SS 5.0% @ 5.0% - .
, . ..... ": -� ... - I..
i,� . .:.,
." �1 �
,�, I,
. , ,
t,, ,,.
I : i
". t
.. .
, . _ : .".
.
� I - - ". '.1. 1
� i .1 i f ...
. : - . �
I
� I
.
sm �
emm ...
p .. .. � _1.1 ..... I 1
.
,, .-�::" ." __ it M Im"m .... . "'IT"
� . .
I . i:_ '' , -1 .
, , ... . .1
, . . i '. .
" . ; 1. 8 . . :..: ---.%4�,�o.
- , ...., .. .
I
_'; NF �
.�i�
A
4 M
,� -1
,�!! I ,
�*-11 I
. �1111
" ; , . i
-, � I
,. �j
i
".1
. i 1 .
_... ... 11
. I �._ _ -
. . .1, ,_ -, i -,
. ; _'_,. ., "I'l.,f `_-.1
_�!,�,__ ;
; i _=i
? t i ; �;! � F!Ac -v ',i�,,� `
: i! .;. A �'-'
; i . .., -!.
I , I ... I
, __�,�.�.
Pli'-'-�i,�;!,� ;_ '�
�'_ i,;�
I
:1 r
�, t,�_ 1-11 �
I., -
I ,
. � .1 � :1 -
... , .., .. .. ... !"'.1,
- " .
, " I = . .
. ;
.:%�, / -1 -.1 I 5LF 6"SS IE �..,
" , ...�_* -Z"-*.: % , ..'!
... �:.,., �*: .": ... .. l. _ .. .. 177T771
'I_ .
- 4 , ,
r
N_ 1.1_�? , i;
I.,
, i .....
, *
-`�, j t
. .
. I
, �:
� I t : ��
i : I �1_ :.,�.%_, .
: , , � ;. A 1,� --;
i P "
; I � I `�
i � V� .�,.;f � If ", ! .,
: I " �.: i --. : r .,
I .
i , �; ; '.
I , I I %-.I.....
.
1-11, _7;�!.�!�.,
_:� !
� ; 1�q: 1* .... 1. Ov"
Lj ,:,:,
, . _. � �
1 !
.
i
, .:......, ., _.
,'.... . I I.. ... .... 1 , D.
4.; ,.-.,:, I I -i .."
; ...
" �, : . �..,.
.�, 1: cd, 5.0%
i��� . ,
�. ,
, " ' ;
g ...
t
LL
- %:", ��
,.
.. �.
i �, . t
t! i _
; � , , -
1; ; ,
�
.
� I -
I :;) �
.
I ;
CONTRACTOR TO
. m
. � I
, ,
.%,. ,,_..1..1
10k .1 __ - I
i - t - -*_ : �
� . .
i L ,,, = I I
. I > I",
I - uo >- Ln ?
. i I �
t
t i . . i I
. : . .
. m
il I ;
. : �
,
t- 1 i
i �
�
! I I
r ; !, I
f i
4
COORDINATE U/G POWER,
TELEPHONE & CABLE
� %, I
'I. i
,. : i
I .
____,00" of� r- I
� I
I I P� r_� I - i .
A
1� �_ 4
. i i I I
I � LO . � i
. i 2-_ i 2_� ;
I
t i
_, - ______ LLJ ..q- - � 11 !
" 8.5' L4-,::T-
I
i �
,�
t I.,
i �j .
I I
't !
k .'..,
! 'I 7
I ".
I � "
. ,
I I '..
: -
i
MATCH rXISTING SIDEWALK, CURB, ETC.
I
WITH LOCAL PROVIDERS,
I
I I
il
, 11.
it
,. ; _. -
L0 I i
1 I,V"!� I , i
; -
------ ---I, C/) I I Lq 6 � L. Ln
..Ill- 8.5' �. ,,.,, I �
'/' LLJ 1,6 -'- - "F-4- I ., �: 1
- V) � ij- c�o 8.5" Cn
-.--LA
i �
I
i ?�
I , I
_. i
:.�. %,
. P I
. . ; �
; .
i
TYR.
�_ . . ,
I A
__&,C�_ - 4� � i �. 1,; I
i i .. 1 !, .
,
� 'I"M , ,_ Y.� ......
- ____�_ f , i `
U ! -a- I
, - �
............ i
" 1, ': :
. �,-' : ,
1".., _ "I ": : -�,:, -;
. j, ii
�
I j k .
t1i, � I
.! ,
. ._..
I
1i '%
. . I �
- 0 1 -11 I -6 , . I
I I I w �: I �
I
GARAGE PARKING E " 1 ir I
( �
____,,i,1
-_ ""..,
, .
,,� "_-f:.,.-,
�,%17_. . -- - .", �-,.;
�'i III::
: , I....... w
. '. :., 4:;,1_.,41.
1'. :_. . I
:..;'.
': ;, � i �
.. . i .
� j i
: 7 �
GARAGE SS CONNECTION -J,..
-
-
�_ *1*1
. I
11 1. � .
� i i
,.--,-B ARCH PLANS FOR $
\ ,, - UILDING A-2 DIETAILS) i
� � - I -1
I I 13UILDIN A
t �
� ':
-
-,:. ... .:.,
.�.;-.,-.-.::---1::
.... 1. . ...
r - ,..
,:;�-t--t.*, ��-*�
;.,.
! i
i i
. .
%
� i
I
�
1. .
I i
I , � 9 UNIT CONDOMINIUM - I
� N -q-
9 UNIT CONDOMI III II(A - _C14 i
, CONCRETE XTRUD �
I
..
-1:.-.`
1.... -,
..,
, . �:�,:
j:'......
.. 'f'.,i
� . ...
'.
- - - .:' '1'.
"
�
. 'U
i
i CONCRET*,E C�URB & GUTTER 4
MAIL BOXES TO BE
,,, (L
,-
%
...:. 12 STALLS TOTAL INSIDE
. CURB (TYR. 12 STALLS JOTAL�INSIDE t
I , , '11.11. ... .
.. I" .1.11 ,
� 'i` I'llL . .5
" i _ . I—— I
1.14101" I
;
.: .
�,.,:., '.*?.%
..., ,:..i.
t... t . .....;
..*.,.,
�__ .H.-
* ... * :-.,.:..I
_
c.. -
! . .
� ; �., YP.)
! : . (T -) C-5
i
INSTALLED IN FRONTAG E
f'..
;.I
,
�.
1*
11 I " .. I
t � I I I
j
I , k :,.i. .1 � �� i
I ; ,,:,,vv",! 24)1� __ �- � . __ I
.. .
i � 1� I
-),. - N 0 1 I 11 . �1
, ''
I --a _0� 0 .. b � � .1
. i
I � - - I-, �_.._i ", ;
1
a
I I
... .1
1'. .. ", . ".. .
. , ........
.. . �::
..., � : .
""-_ .., .,.,. I
.. . � ...
,
i I ;
; t I
I !
; i .
. I
LOADING UNIT IN LOBBY
t .
1; .
t .
Z; ,
I � I !.Ili . . i, t .j
F. i! I I
-
� � �,� . " i, i �*ffik�q . .
� ;. I ... .- 1 I m .. _To Qr7 � -�;
L t i �
_1
�,
-,'.'.' V-:�� :1 " -
:., I :'-�.,:�:�::,
I , .
?.. ..,.f.'.'.*.
. ..,.,. - - � . 1; ...
!
i
; I
20
a I DATE _L BY
I
EXISTING LEGEND:
I I � . �
. -,. � � I % . � � "
:1 - I I i,: ": . , :.1 �
'. ; - 1 ,�, : , . , .. ...... I
. . I
. .
,.�z . I m r "' , -�� , - , ' - . . . � I 5
I., '�' : LO . .4-,:-,:-.�
, : � CD � CD ' - .. ..�--- .
� .
I ..
I .
i, I INSTALLED IN FRONTAGE - - 5 . . ...I........
c., 1 : V) 1. I .r_,)__ I.. - ___ . _1 1". I... : I
I
�_ 11 ___ ... ... .___1.11:<_ .11, -1 -1 11 I i - .-.... ".. 1, '�::: ,
� I I i :-1-:-:.:-:-:` , 11
i . � .." -5
ARCHITECTURAL CONCRETE- � � f , " � ; M C6 ... C
� - i - . ,.:... X..V......." _
I ,
i � - /. - -, - -LOADING UNIT IN LOBBY ) .-i . 1, :�:,��%:�:�:::�:�.
"i I ,.- I I = . .. ..... I ;
(SEE ARCH. PLANS) z_ �'r',,`i4�,'-t;N`G-, I I I'A. I f ! 1 ,.? !*
I,- -Z f 1 C4 .. ; � .1. . I
, - I I I I I L ! _. I ... .. ,
.. . - [ - ) , I I . __ :x::::::::::::---
.. . - ; 4 � . '.
- ; . . . . :�J':�:�:�:�:�:�:... 7' C
, I I __ . ....
, , % . . q
4 1 I e I , " . . I ONC�ETE SIDEWALK
Wi i i 1, ... I t I .. �.: % -.1 . '. t'
� . � - P. - I -, " . . ... .:...-. , - I .. 1. .1.. I " 1. ; I
I
I , . ,::,:.�::." - , . � , .. F.,� ;' * , . ... � . ... ..1. ... i�,� �:`,.,- ����.��: (T�P.)
,
il . . . . . I ,% . -:_:; " , ...... ..' .. . .I.. .. . .:...1-w"..�, t �-.�,,--, - . ��: ........'.. , I -..-.j..-.-.-..--.�-.-.-...: t
. .. I It. , _ _ .
I— , . ':..., IL I- .: .. LCD,., "' I - . '....�` " ., - 1:6 [.........: .. % .1 :,,. � . ..... ..
�: .... '. .. :1-1.' :.. .. ..-� . I - - % .. ". I a
. . ... . `11 ` .. .�- 1 ...'.:. I
. -,.* i*-. . , .. ,., . . - �., " *- ..: ��, z
: ...*. . .1 k i., - - *` *p * C: - ..1..,
I . . .. . , - *.1... . - . . -.:'�o:� :t: . ... % ... : ,.:., � . ..."'.... 11 .,
�, � A'. ; : , .: . �-- � '. ,.!.,.��..: ..: " � ',W- .. , , , . , ... iit . '. : 'r
� , ..,::. . . . , . . '... . - � - - I I .
�:-, .. . I . . . , I .".. :.; 1.;
. . . I '. . - r - - V....'... - '. * * � - L:L__` -i -77 '....I. -I.: '. -,...;, . :.;,! '. .. . 9- WATUD ki
,�,: . � AGE .. ., . . I , . :� . . : , '. :4 .........
...,,..�:-.-.'�l�.--'.'..�..-',....,.,. i , , . . .......... UTILITY LEGEND:
, �%R ' - ,."'....q.- . .""7 : . [ .. ... I � �
.,: , .... I . . . . . . . ... .�
. . .1 . I .. -
.. � :.....:.1. : `:: , , , , ..,. � ..". ': .; I.: . . . t.:.v.*.'.*.,.1.: i
_�1_4 - .1 I t . .1. '....'... :�:f::�:�:�:�:�::::: I I f-=
i I ::I. . .11: . L IER
, I � ..., .1.. .. I .. .. . , 1. :.- I ....... I
... ::.,. I i . 1: ., _. 11: � . �� .... .... ..... GAS ..."..", ) �.. '... :�,,:�:�:�:�:�:��i� ...
. �....,.... *1, . .:.;, :
... m ... 9 ., v 1 600 SS I
. .
:.. � I t_� ' 's'- 8' . '�7 ''.' .: �� - -
1'�. ... I
I .y � ..-.. . I : z �/ _8 _ _ 8. . '. .: .� �. .. 8 9 .5' k4 " :, *.' : . ., . ,_�:, , . . � 11 PER CITY OF EDMONDS -
i I I ... .�': ---- 1� ,.,.Y� ': .,.`�. " - . I '.' �, ... , I I I . . -.Y.,.,.,.,.,.,.*.*.,., A %J!
I., : ., � .. "
- . ......
-A " a 1i - ,.:-.1..� - .__m_ ..... I ... :.1 ., i - � 1. - ..: , . � _-, ,_... . ::j1::::::::::::::::::::::, ; SANITARY SEWER PIPE
. , ;.... *...,'- , t, . .
-1 ., .: :�, i r
. I . . Lq ......:. - I
: � I.' .1. ,7,- - - ::- , ,.fl, �.. �:�:11���:��:���:��i:���:���:��i:���:���:ii�:���:��
- � . , co . . . .
.. .::. . . . .,. 1
I 4...-- ".. . , . - - C.0 " bo D . . I .." .1 ............ i I f; it
I . ... ... :. *1.,..---,./ I �: -.1 -, `*7. 1 .... "' ., -.--.-,--. ,�".%v.,�,�-:.:-.-:-:,
_
0 j 9 , A . I - .. ., �'.. . - ��i.`, � � .., . , W /
I : .., ....... �::::-. �
- . I . ... . E:::::.:-:-7 j I
."'. . : , . : . ,�i� - . -
.. :, ., . �1.1��:::�:��:��:��:��:� .. i �
. �:�l 1-2"x8"TAPPING TEE
i i , """:1. .. ...,:-, . " ..V)�.":,., : ...
! � -_ --- __j - .... , . . " " - 'i . I .:,."., .'. -.,-]:: .-"; ....] -, ..-:,: - - .%.. .. . ", , , '__�
I 1A 1�_Ij 1�. 11 . : ,-: .":._ . :� -..�- - 4 .�.. �, . .. __� WATER MAIN
e I i i �Z- .. - ., -, -, - * -, - I �� __� 11 2 WML��
I I z - - I- , ... 11 , �'f .,:.: . i
I i .
2" 90' BEND 4 vvh ; 4 �t_' �i ,� : -' lr� I, ,-�..",'!i j,: I ("I -.*' *., .1�.'....'. - �-; �
,
I , I ; 1i �
i . fi!- e I �.111; 1 4.'. .
.1
,., .1 I. . .... I I
- . _ _ t ;'', ` . ______07cl , ....:-, I ! � ",
i , :, ; ?'.� ,'� r. � _ it T. - I ? I
� i ! . .
� . ,::::::::::�:�:�:�:�:��.
... )! "t) ,
1 4 : e SU- .1 �, ��,: , I *.1'.7.*.'.'.' ...
; i . I � I , . I
i I 6 f'Ll��,A F.,i 1� 1,�;,2.11' i, : `21, , * V., I * I -.-.-.4:.. 1 � I
, 1 e .
� I ."................... �:,� �
I I I - r � ; " 2,0� ._,:"'�'Ffl_,�` r: i - .1 - 1"-'.*-'-'_`:::::::K I HIGH TRAFFIC LOAD DRIVE-
i j , m. . G i ; � _ . I i",
; i 'i i... ,Nf("k '�.l ,__ .......... ,---- -I
.
� ,
. . . . I , .-- . I ,��. "'."! CN :.,�Ai *...- I . WAY PER CITY OF EDMONDS T UNDERGROUND TELEPHONE
I � M!:�!f_,_;:%i 's 4,_., I � I- -.4-
F ; *i %1:�:�:�:�:�:�:�:�:::::::�� �.i �, i
z ; ,�. � ............ I i �
I ; i . . :-A ,:, I
I .......... I s
I I ? i 1 -.� ..... *':*.----4 ,
� i , . i'l . 1"`-'-'----:-*-'-'-*4 i
� ,: �,_ " 1 . � ................ !
. . � 1. I I
. . �, 1 j -[:1:.'J1'j1j_, n , I ,J,111*�11_' +12. ,.'..+. -, 4.0s.'.'.'.'.*.*... 1 � � STANDARDS. SHEET C-5; -
� . .1. __ . 1'" I ...... .....
I - I _,�, A . � . ! *1 .....-...... ; I i G AS LINE
. , I . i
. i :, I . I 1. -['l X,�r�! . G
I i I t :,: fPYH1 , - .( H .
- I'. Z 1 r I d
� .
.
'. I i %...,t � I i : I.j. � ; --.�":-.i..�������������������, , i i DETAIL 6.
, 1 1 1 \1 , 1. - I . ? .... :4 : . I i
.... .... � - i
�4, i�,.,:" * C i if-l"- �,i,,- � I I I., ... "
- oi .1 I 1 4 1 ! i , ", - �_ I .:i:: �: .. V, I
,
..�� i�;: )� i �,�.�, �, " .,. :- I
i I v � . ": 2�1 1� I., 4 ... :.:-,.. :..-:.::, /� ", 1�
!_ V _ i . . . . -
.. I—— I , \ I'll . )�� I I ,�_ � 1,4;, � ... .1 , , , il,� - MONUMENT SIGN WITH 0
� .411-1 ___X___. .1 .:. .n � ,
. -
I I I �1, Xmm .,�:'Cmm m"m ,--Fmzmmm= '. ism - .X, 6i&w., ,. " �. .-� .i - : I . GAS METER
. " .., ` .- ��- �����i��.A, I
� � ac I +i ;`s I' f ' - . ! �.44
. i . I � -
.. � , , .
. '. - 4 * .......... I :
'. , , ......... i;_ 1 1
.1 -, , ...... ,� .
; I R,';�, . . , BUILDING NUMBERS
,
� I I A+ f . I . " .. , : , "'.4, 1 ;
, " -, ..,.,.%%%'...... 1 ; �
-..,-- -,;k.*.1.1.1.1.1 : 1
4
� 4 : -�,;� ''i .....
1�_,!j,`, �', ', . i , -�-., -,-,-V-,-,4 (
C D ,I , ".. .. 4 t I 1.1� -.--.,--���i����i� I I COTG
i I .1 * ....... I
� " , I ::.. .1 I
... ,
tROSSING WATERMAN -_ ... I..'................... . - .... i - SAWCUT AND MATCH
I ,,, t ........ ... -
. a ;
I BUILDING B i 17 � \-CURB TO BE"'PAINT-5D - � -�' , -'� ; `;",*"**"`%`%'
All I ..".: i . t
___� � . I..
,", F ,I' ...,: T.
1.1+1 7 OVER SD .. I �!.",'."���::i�::��::��::��::��::��::: �:��:�:� :_ - EXISTING GRADE.
.. . �:�i _..) I
3 MIT TOWNHOME _ , "_'�-� *-.:-.* I . I 1
,:,.. :, . ; � ..1 I
�:,t * , I I ., � i -
i , . :-:-:-:-:-:.:.:-:.,-:-, ;
" - , ;. . .-. �� .,.,;;+, ,I , - * :": �:1.-.-.-.-.....-...-.-.--. I
: �� 0�',', E" ,.,;..:, ...1; �,,"i, � I , , :`
11W - r", ", 2 STORIE8 . �." �.. ,;:�,,. - - ., ", + I , I
11 I - ".
. .1 1pi:1:_*.A: I
I '7_.- �: . .. .. . ;� I--- 1.11., ' � _ - , . ..- . f f I_-, -, .,� il 3: il - ON -STREET PARKING 10' WATER AND SEWER EASEMEN'-
'i;tl'i, .41 F". I '" � I :.�!, ,.:jIqR "NO PARKING"
, _ 14, 1. +1, � , � , _ ...... ! , , "
� I ............. - ,
' * I �' "I".".1.1. ....A
. ",". I'll, I.. ... .. . "
.�` �'::, z ;
, .
� .:. . ... '. I
..:. ;.'fr*t -%4!jj� it., I.: . .............. .-
:t_ v. . " .. TO BE STRIPED &
- _" V � . �: I... t, , w ,,�:�: i
__ . . . . ,
.i 7 � � .:�I. . � �:;, ,
11 . - - - . I '! '. , i - ,I
�-.'��;ia , t i.,
"' -
5 PA�KING STALLS . : ! , � I "i i , ' ...... ***, i'll , " , .. .�,
I
1 ""', I I , � �, , , � , .,. - �,. , "
1: " ;- 1.1y" , -, _ . � _ , A �..- -i�, ..'..........'111 ��
_;If,,�,�
%,5_,�_ s i I .t ! .��..-��.��..-.*......,...-,.,..-�
,' S 1 " MENTr2 � ..!, "..'................, , ",
1 "I ,:1 __1.,11_..... _ ......... . . & 111.11., - .......... ... r � ., _ I i SIGNED PER CITY OF
I ., . I- .:j::::::::::::::::::.:::."F
" DOMESTIC '' *CAUTION* ..'�; .1 ........ �
5LF 6" S ,,-..-- _-, E PAVE - ..........................i ;
- ` � �f. ....
' % I :�;-, .: . :1
_
: , .... I -1 I
I .. . .1� .... + , " 1
,-:� - �: H1%;, j f .'..*: ....... - D -:' ' EDMONDS STANDARDS
��, � - , . !!.!.!.�.!.:.!:!:::.::::::1A �
- I
. � i ";�,.' , ''. ,�.� @ 5.0 � �.., (TYR.) � C��v ' !.!
.1 , , .: - - _�_ 11'. - - - ii -�:',EXISTING 12" GAS I _, ..�:�:�:�:�:�:�:�N i
.o " �_n , i LINE ,I ...,.:C,t .: ......
WATER SERVICE. - �Ojjl,` . -.-.-.-.-.-... i mmm3p ��'_, �- 1_ .
I 11� : :� �f I � .� t t - .-: .".
_ , .; - .
" RffRy + . : .:,.. 'X.'.'.V.1...-...-.%-..�/1 -
! � ., - Kj
� i�:i%-.r�,-� .... SS, r �.� t; ..,.. .. � T- ! t.'.
,
. _ t , , I
- -.1 +.--. 1_
..4,..,. i .
i _1 11'. _.1,_ ... ... __1 - ,j N6f§HOWN ON SURVEY. " ,- I i d. " 1,
; , 1 4, '. �,._ li��i���ii���i�'11 I .
: IE=415.8 _�!_T I I . . . � � ,..--t
I i
.1 . - r_ i CONTRACTOR SHALL .:..%. ' ': - .-11--*.----.-.---------:-1 A ! .. .... .
..: .. .......... r -, - I ;
11, � -1--. i " : __ -----i � 11, z . . i.. I ......... 4.. EXISTING 8" W/M
'_'� C. 0. (6 ") . _, i, %, I ; j I �,ii�.... V.....: ....... I ..--.
2 +1 I :! Z I ,0 .r.: . ... ..... :.. ,�-_-� j i
; � I
i t � I ? VERIFY LOCATION a - . -...-.-.-.-.-.-,..-.-T � ( 1. I
i z - . '..'.*.V.1.'.1.*.1.1.1 , TO BE VERIFIED BY
. I 1, � 1. :.'.� :':!, �-",f:�:.':�:�:�:�:�:::::::::�- ,. I ".
.: . . - , i
��4 IE=415.62 ,, I . ., . .. ......., 1. 'il .1 _ ,
� i I - A I :�-' .*1 ..... *...'............ � PAVING LEGEND:
z I . I I :.:4:."...:.1.:1 1, . -.-, I
q. _., i 1: 18 � .% . ., ,.i .... v:i�- �
. .�,.*:.,: .. . .
_,__ ,&i"." ` � i r, I- I ,% :�:�:�:�:�:�:�:�: 1. 1i
� i �' 'i .1 I sm 1 :,) NEW APRON AT EX. I 1. *.:.w.,.,.*1 .... ; ,_ I
,
I -
� I . *. :,, - .::.--.-:. .4.", i __
'. .:. . .. I'�,�
. :-z".."......., I
i - - . * : �.,�-.-,,.,�����:�:�:�:�:�:�:�:�-
I . � X I I '.. .. .... . I <
, " ,- -+"!� . 11
. I .". F . :,-. -1 ......... _ % 1 i it
4 -, Z.......... �:.-Z. i i DRIVEWAY , .�,::,.,. :E."* :11 I :
41 . .. 1. s'J_J� - _> � I...",%,.".......... J -
.... 4 ......
i , .: �: r �,!;_�, ... `���j���i�i��� i 2-Y2; WATER METER
, " :1
� -..::,-. k- i ".,.. �jj �` .
i .%,. :. : , I I " 1. '. *.'.%1.1 I ....... .. ;
. , , . � : r
.., .... . " ....4 ......... ;.
. .. . - , . .1 ,
I i - � , . -F-.*-:...: ........ � . ,,--. I ...'. � .
i 4 I ... : .... , -.;.:
i , *:: .: .: .�% - (�) I . .* ., .... . I ONDS 14, -! rQFW DAX/CkAC 2
.. . '.:.�'.. .:1_:..,:.,.,.1.*.1.1.1.1.. 4
." %.. . , 0", § .... f�����.-��:�: I PER CITY OF EDM rnm
CURB TO BE PAINTED
YELLOW & STENCELED
FOR "NO PARKING"
2-1/2" TEE
� I � STANDARD DUT
��5 (TYR.)
GRAPHIC SCALE
10 20 40
( IN FEET )
1 Inch = 20 ft.
i i , . .. - I
; � I -�:�:�:�:�:.*:.":�:.,:�:�:..,:., � � 4 11 I
I i i '. - -�. .1 ; �
i ._-, ,-.--� ... I ." .. +. .
I i . ,s� I CURB TO BE PAINTED � 41 �_',:, _1_ " : '* ....... �
: _____ 0 T i .1. I .. � I I _1 :, .. � :,:1.......................... I ; C-5
�
,
-
'' ��17 * ............. , '' i
il ;, E .............. I
- �
4
1. i �
--,-,.:::-:+:.:-:-:-:.:: C\1 �
, *:*,*", '%"*.*'
I P . RED AND STENCILED .-,nl .., I %.::.i.., It .......... !
� i A I -:.v ........... r/j, ; 1-2"x8"TAPPING TEE
� , . ." � : , _- + .�
. I 'elill , - ,,, �%z�:.:..:.:..............+ I
i .....; -, - � STD. DUTY PAVEMENT
I 11'. �. �fll', .... I I.. i . .
. .11
.. .
.
. -... -1 -.1, i I _i K ..:;.:-:.:-:.:-:-.... z
I i.___ ."'...1.111+1 11. I.-..-,.--- 11. -\--_",!- .�: ". � t FOR "NO PARKING" i
__�,.�.", i . IS
-P. - " '. ". �
; .:��_ .
. - � �-'__ii'i':�:�:�:�:�.: ... I
I , L , :. .:-: I - I
. i i , , �
, _i���:�
..i�:�:�:�:� ......
I � . ,?,�...'..! : " .. �i -5
_. �x` '�. -.1..'.. � . _1 I V...., 1. - j :!:_..,:.:.1.-.-.. . .-; t c
, wmm-- r:jiimii -V ] _,_� ,I . , G
I ; . I.--4im=-,- ,
, ..., I if I r - - * ��u"
�: ��i 1 V"IfIt"', r i__-,,�?' ,:- I
I 1; J fi_1 I i .'
.
".
h t
: , .-
i .
1,'. ..
_ -
I
j
f
X" i
�_,, I
,
__�
.- "
;11: ': I
k �
t i
;
4
4d 1. �1. ".
�
ENT :1
'�:
, I
REVISION DESCRIPTION
PAVING NOTES:
1 - DIMENSIONS SHOWN REFER TO FACE OF CURB,
BUILDING OR TO THE CENTERLINE OF PAVEMENT STRIPING.
2. FIRE LANE STRIPING AROUND BUILDING PERIMETER AND
ALONG FIRE TRUCK ACCESS WAYS SHALL BE INSTALLED
IN ACCORDANCE NTH THE LOCAL CODE AND FIRE
MARSHALL REQUIREMENTS. CONTRACTOR TO COORDINATE
AND INSTALL AS PART. OF THIS CONTRACT.
3. CONTRACTOR SHALL PROVIDE A TEMPORARY TRAFFIC
CONTROL PLAN FOR THE CITY ENGINEER'S APPROVAL
PRIOR TO ANY WORK WITHIN THE CITY RIGHT-OF-WAY.
4. ALL PAVED PARKING LOT AREAS WITHIN THE LIMITS OF
IMPROVEMENTS SHALL BE STANDARD DUTY PAVEMENT
UNLESS SHOWN OTHERWISE.
5. CONCRETE SIDEWALK SHALL BE 4" THICK PCC OVER 6"
M FINISH UNLESS OTHERWIS�.
NOTED.
UTILITY NOTES:
1. THE DESIGN SHOWN IS BASED UPON THE ENGINEER'S UNDERSTANDING
OF THE EXISTING CONDITIONS. THIS PLAN DOES NOT REPRESENT A
DETAILED FIELD SURVEY. THE EXISTING CONDITIONS SHOWN ON THIS
HITECTS,AIA,
NK, STEADMAN, Se ASSOCIATES, P.S. DATED
DECEMBER, 1996. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING
FIELD CONDITIONS PRIOR TO BIDDING THE PROPOSED SITEWORK IMPROVEMENTS.
IF CONFLICTS ARE DISCOVERED, THE CONTRACTOR SHALL NOTIFY THE
OWNER PRIOR TO INSTALLATION OF ANY PORTION OF THE SITEWORK
WHICH WOULD BE AFFECTED.
2. CONTRACTOR SHALL REFER TO ARCHITECTURAL PLANS
FOR EXACT LOCATIONS AND DIMENSIONS OF SITE
APPURTENANCES, PRECISE BUILDING DIMENSIONS,
AND EXACT BUILDING UTILITY ENTRANCE LOCATIONS.
3. CONTRACTOR SHALL PROVIDE AND INSTALL A SEPARATE METER AND
SERVICE CONNECTION FOR THE IRRIGATION SERVICE LINE IN ACCORDANCE
WITH CITY OF EDMONDS REQUIREMENTS. 't.
CITY
4. PAN! A#"R SHALL SUPPLY & INSTALL 211 WATER METER WHICH CONFORMS-
..... 1-11
TO CITY OF EDMONDS SPECIFICATIONS. CONTRACTOR TO CONSTRUCT
2" AND 1" DOMESTIC COPPER SERVICES. CONTRACTOR TO SUPPLY & INSTALL
VAULT WHICH CONFORMS TO CITY OF EDMONDS SPECIFICATIONS.
RDINATE INSTALLATION OF ALL WORK WITH THE
- CITY OF EDMONDS.
5. FOR SANITARY SEWER TRENCHING & BACKFILL PER CITY OF EDMONDS
STANDARDS. 1
6. PROJECT TO RECEIVE POWER FROM PROPOSED UNDERGROUND ELECTRICAL
LINE. CONTRACTOR TO PROVIDE BEDDING BAC.KFILL AND CONDUIT FOR
.
EXTENSION OF POWER FROM SERVICE TO BUILDING. CONTRACTOR TO
COORDINATE POWER INSTALLATION WITH SNOHOMISH COUNTY P.U.D No. 1.
7. CONTRACTOR SHALL COORDINATE ALL WORK NECESSARY Tin ppnvirw
- -� ? t .. �. -
I I /t - �i =i i z . "' -
(D I/ I , � 48" SS MH LI'L......,..,%,...�..'..*,.I.,*,.";...*�I CONCRETE SIDEWALK GAS SERVICE TO THIS PROJECT. CONTACT PUGET SOUND ENERGY SERVICES.
� I -, , "
__ I " ,.ii:" :
."", I. \, . ! __. �. .- _'.4) 1 i
I 39L - 6" SS -1 � '.._1 ir,',� Ll_: i IE=410.15 (S) �CJ-5
_1 I . " i; �'
@ 1 0% .., " 1 4 5 LF0;'8 1 q q 0 9 r� - � CHANNELIZE TO 8. CONTRACTOR SHALL COORDINATE RAISE ALL DISTURBED MANHOLES AND
.i I . _......... zz "I
.., �:..
- - i /� r ."�___, I -!!k .....I.I.......'........._.". . 1,;
*
- - . 11 I/ , .,..,.*.,:.*.,:.,.* ,:.,. I,, LOW SOUTH CONCRETE EXTRUDED CURB (D CLEANOUTS TO GRADE.
- ,- . . .,:.,.%,.,.,:::.-� I ,
1 .',�.. .. ..::::"
. ! ,,:;' , .. .. ..:,.1.111*1 . IE=410.25 (W)
* . ...* ... ........ i i
,� 1z , I I _T' IN A L 11 - 6" C.O. . ... .............. I i
.
.....: .... - . , - 1�� i.r. I I*.,: .. .... :.: �__ � I 1 9. ALL MANHOLES AND CLEANOUTS ARE TO HAVE LOCKING CI LIDS PER CITY OF
'
.. : - ...'.."... - .. . ..... -
.., � ... , .,.
... :.. ....
. .A... ..... I
%,:.... i I i ��,�,I�',." IE = 413.00 11 I ... .......
__ � - - i 1F..'. . . ...
____ - I . . - -_ � . ..,:.,.*.*.�:.:.: v.".-A .. .
I., . . . . . . . I ..... , 1. ,,::..... :...:..J, . . -11 __ i HIGH TRAFFIC LOAD DRIVE - - - - - - - - - - SAWCUT S.
... I
I . .
_ '."', . , . . .. 1._",��'-Ii- I . V4 ;.o i
. � . .... �� :
- . ,
...
. . _ .. .. ... :.�:�:�:t 1
.. . . ,
... ,--i"�17.: ; . :-- . I.................... .
, , , � * ...'.. . ... - ! m . WAY PER CITY OF EDMONDS
*
I I , I I .. . * :: . -....
1. .-_�, ) I - ..:. , d
:- :,` I
": � ' .'! , :-,'---.: - 1 " DOV. �� 1 F I :,.. ;
.%. - ... %. . ,..,.:.. . i . . ...
1. . '. V I'll, i ."', * I '.... . ..j.,.*.*.,.,.,.. ...:
VLI 6' S i . .. '...* I _: .. . , " 10. THE CONTRACTOR SHALL COORDINATE NTH PUGET SOUND ENERGY SERVICES
.. I _ I .. :::: i
-
.-I.. 6 " U. U. .:..,:_.�, .. - I ... ...., I-, __; : .. ...... 1:1�-:-: .... :�:..'.' I �TANDARDS. SHEET C-5; -
' �--�-' I �� 1,; . , * * ��... - ; .
'
%, SS E ERVICE - � ._� - .... : .'.*.*.'.'��: .... I f
, !, ; ',:, �, @'5. .%,�, " i .""', " i WORK IN THE AREA
..;"*: @ 5.07o � ... I , � .. :-'f.'.'.'.*.,.,:.*.1.-.-.....- !
I IE=414.96 1 DOM' , I "�: I.., I SS E N TR Y,,,, I �. I . ::"� ... * .... *"** DETAIL 6.
1 . .. . , 1*11*11 ....... I YT THE EXISTING 12" GAS UNE IN 72ND AVENUE W.
.,:. m, ` . � , .J............. ....... � �
""', ! .. -,: ......... . \\ �NOOT SHOWN ON SURVE
4.. SERVIC .- ; .. . . ; * :: .1 .............. ! ASPHALT REMOVAL & REPLACEMENT
i .� .............. a
�
. ...
..:...... � .. I IE:�F,413.21: , '. .1 LL�m
... 11 --I -11
....... .... .i.
, . ;; i :--.�,:-.- i , .� 7 1,:! i p �Z�- - , .,:,::: i
. � BUILDING C 51..:., BUILLAN . ' ' - l... ...!::::::::::::::: �
� I ..
..
..
..
..
i,,z I ,...:.'..V.,.,.,.....1
, i. � I .. .....1. .... CONNECT TO EX. 11. THE CONTRACTOR SHALL COORDINATE NTH THE CABLE PROVIDER TO
i? ;, . I... .... ............ ., I
� !'.;; t i , : . :. I �-:i , .. V w..".,. . .. �. I
I I � '. , . r_... -
... .. �
3 UNIT TOWNHOME 1. 3 UNIT TOWNHOME ; I I '. ... I ; :.,.-.-.-: . .. . - . . .. - ., . . ; __j
. . ..Zj,-^�� ,�-- . ... * **
I .�.. ;,..:. ".,:.. . .,. ... -
... 1i .. . . . 4" GAS BY PUGET ... INSTALL SERVICES
il .1 . . . . .... : '"
. � I �_ i : :,; ..... :.
. I i . J - ---:
..
2 STORIES GAS METER ". .. 2 STORIES 4 . . . [.:.-..' :77 NEW ASPHALT ROADWAY
��s 1 I.... i.. i .
� " - i -,.,.' 1 1:.)i.1;.1 I , . � T'.��:�:.*:.'-i:�:�.:. . . i SOUND ENERGY. DO
. I I , Pf ; t % . .. . I
I I.: I � ", i I I -
, i .�ji�l,q, ;!-,-..'-%,,,p, . .it
5 PARKING STALLS (TYR ) 5 PARKING S TA i L�" . '.. � 12. AH ON -SITE SEWER AND WATER IS PRIVATE.
.1 : L I. 1v ,,, .� .�`` :-,.::::::::::::::!::.,�::.::::�:
.. i I �_T. I 1 � I " I
.
rp, i � � I I -�, : .... :..� - i NOT DISTURB EX.
.. . . , .: " ";,:.,.,..........I ......
.1 i i �i�; .
. 11'. � i %.....� I ,
"
I
I I i I �...:..._ ::�:�:�::�) ., � :
�
i i .. -7-1 j ; 12" GAS MAIN.
I I - .- , . e -z . I ...
. '. I s
--,---- ,� � y 1. � :"', �:i:::��������������:����������� CURB &
� I 11 I . "... -1 .-.,---..;;, 11 ............... w GUTTER
: I � , !
_
'C", , � . I
".1 - � ,%, I—.. - ; . __ ... -
i, ., , "', I. 1 ,:�5 .. ' '�) I .
�
i i "' � � i , r: , ;11 %.- . "'��������������������������.�� , 4! ,
11 ...��' ,,'a _ C E TO CONTRACTOR
I ,
i I i _ . .� 1, I ,
. 1 .. ... ... 1_,:�;.- , __i .. I.;.-, � , . \ C.O.
;11� I i;.��i 1-1.1 , -1 I :: �";"������������������������������ ; THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT
- � / , ,:* � i 11 _- I - .. . . *
. - ,
� �; , � i ... -al. . i, .�I� 1.'J,�. 1. 1, .� I ,,, - - ., � ,_ --.. --- ---- : '.' � (_1 K, . � - I.- IE=411.42
_...- !, . I - I . J,!,
�� � � " N11 ... ", � I ,� ". _, , _ - - �1 � 11.
� bKohm"m bi! i !* , � ;." .) ,:, , ,
.i. .*:.%� � .1 ..
I .
am= � 1. v_ - _ � ".F,__ ( 1. -.�.�-.�'�j ��,,�������������--------------.- -i � HE LOCATION AND/OR ELEVATION OF EXISTING
11111-1-, 11111=.--.- -.-... I � . I
. -_ . , __�. __ . �,� _ ...� I.... .,.,.,.,: . i'l .
I ��_ . ... .., .� I
\�71't -.- .1 . ..... , � I
I . ,��v ,. .... ,. 7', ;
, ,�_ ,_E.1. I i . 4'. .,
i .11, . I _� ', .1 _f.: -:_..._. I � I i I',- 1 1 MAIL KIOSK FOR
� .
. , . . . .. UTILITIES AS SHOWN ON THESE PLANS IS BASED
,
i ,., "t ... � 1. I .Ir
i,�, . . . I; . � . 1-
t '� � . -1
,
i .1, � . ....
i ...... ! ...
� il... I � . I : � . - BLDGS B,..,C & D
- , , , * � .
. . ,� � k"i" I �r, � I T w '
i I � - , , . 't'!
_,_.1.'. :A, . j �, - ., .. ARIOUS UTILITY COMPANIES
,'�:, 0� " �-,' ::, SS MH 1 i _ ., w_ I i Wlkibi ,!��_:, �; , ":
., ;, � � t t _,,-� � I i i � t.;�;_ ..
, 'i-j ; �� r 1 �,!�' H �� AS AP 9,.,. ; I,
. I - :1 �,,:- � t 1"
�. _1 ; . - , ., i i � - .11-. -6-UILT INFORMATION. THE
- &-r '! t !
.� ! i . t ,;i,,� �, ,;: AND AVAILABLE AS
_;;�,� r .; :
RIM = 418.0 C 4 .1 ! 5 f .1
. z ( 1: i i ; EDMONDS POSTMASTE R; ' INFORMATION IS NOT TO BE RELIED ON AS
I .
ON -STREET PARKING I *; .':; ' I
i
r ... I I
i . ,
IE = 414.02 (E) 6' ASPHALT 1 ' ' . �;l Qf�, �- i , �.� �il:, - .
A . , .-�`:��; t.�, �-�,.
? I "I i`.�. .,.-.- __ __ _!'... .. �i-,! � BEING EXACT OR COMPLETE. T
` 1 11 .... . ... I."...."---... ..
.- 1"WO � -
TO BE STRIPED & ; � 11, : ��
I � I :w, �. .1111.
. __- �P.?.;',!...-;. , ; t..�,, ,�,, ,F� : .. . 1, iHE CONTRACTOR
I . , . - . � '��, _f,l ,
. 1-1 r : !,�rlifr �.. r. ,:7ii *." :
IE = 414.12 (NW) TRANSITION '. . : i i:!� - . ; .,.: .,.:,: �.'p_ . I �..
1 � , , : 11. f., , �,�i�,-.. . .1 -----. ___ MUST CALL THE,APPROPRIATE UTILITY COMPANY AT
, I .1
. : .-
;
: . : J'�'i' :-- ;..;'I 41. �fj� L.'!"i'L 0*1!6 LEAST 48 HOURS BEFORE ANY EXCAVATION TO
I .,- I -Li N.� . �. I .; OURS
GRADE � .- � , �, !'� 1 .j` .1 .'v& L'& P,--; & '% V *m 1) F 0
IE = 414.12 (SW) SIGNED PER CITY OF TO EXISTING ';' i � �Dj)" i'li-Y, . .1
w : 101 - I .;"�; _: " 0"_ ,., . "! " -
a , , .
EDMONDS STANDARDS i..' � - �: :_ r.__ -1.
-, . 1 ,".1-., Appi, .,,,,* m .
11'' :%F- ,�'.
.i i i , N., .1 REQUEST EXACT FIELD LOCATION OF UTILITIES, IT
14" .. � _!.- I" i .-, :Fo , ", A 7 ,,, on't I BEFORE YOU DIG
. i -v ��, �-, lf'%%l SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR
- , Q "' " '3 U I
1; N --j A. CTI
i vom 1 -1800-424-5555
;
! I TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT
:
. 9 Em 11111
. 0,ATE:__4.t_-1j0 ,j . I .
.
. ! - _Zjq�__ I WITH THE PROPOSED IMPROVEMENTS SHOWN ON
. i THESEPLANS.
I �
. el , t
L I
- I - __ __ ______ - __ .. I ITY 1-7NIG21NEFF1 _: .
� - - - .. " --. --- . -I-------- _� I -
II DESIGNED BY: I IqqI IF nATF_-1 vffi--4 I? -40- I I A /_ - I- f __ -.r - ff I &-� 2 I - - � - - __ __
mrr
/U/UU -
BUILDING 'A' REDESIGN
vil I
10/28/97
- � far "A - - /_
,It-
12/12/97
DRAWN BY:
"I ---, C��
-
, 1
CITY COMMENTS
� BF -_ PROJECT NO.
L
8/4/97
- - I
PERMIT SUBMITTAL
CHECKED BY:
JRG 977711
.4, 1111h 3 519 01-
IST
- - . I
ORAL
- 1w Irly" V_
.
-".--,���-.-,�.--�,.-,�,�",--,��-�,-..�', � " .- 11 11.11., 1 1.11
I
1 -
, - � - , ,, ,,,, - ,,, ..... .. � ... � .- -. I . . ..... .. __.-I-111. I-.
.
"I .. .... _____- _ ;_ ''I-1-1-, 111 I—— 1 .
TIRES JULY 7, IN 1
" I ...'' 111__11_.__ . 1 , 1 11 - -
I TA Ur.-w &:T A I I 8 I " I A I A = ASA_ I a ra = = r-T_4JTm-7-m1
- - -- - - - - -0 - - - - �%-1619 A %.* A6.0' %.o UY,115 1 if __ ; .
IL NIUR AS .
I
i
!
Planning & Engineering TURNBERRY LANE CONDOMIN M ;
!
9709 ThirdAvenue N.E. i
,. Suite 203 :
!
Seaftle 7 WASHUNI'GTON !
., WA 98115 UTILITY AND PAVING PLAN C-2 1
(206) 522-9510 FAX (206) 522-8344 i '_
I I-
- - --I ; ,
__ � r
I/
. .
I
,- "I'll."'-, ...... 11111.1 ,�,�,-�.",-���,.�-���-,�-�"-�-�l,--� ... ___'__s___ 1_1__.__11_1-_ �11-111-�l"...,.��,.�,-��,,�-.-,�.-"-.%,-,-,:,-�-�:.-,-�"%,-,-"�'ll-l�t.-,"-.:��,�-".-�,t�-�"..-"-,-�11-11. _..__...__ 1 . .I.- .. 11, I
1, "I -__._-.. - _', __ I-— 1. I . -.1.- _-__1.1__,_____. - 11 . . . � 1,
I
. .
I
I
.
I
#3 BAR
EA.CORI
#3 BAI
EA.SIDI
#3
c*
M. VVm I
FRAME AND GRATE —
(INSTALL W/ FLANGE
DOWN OR CASTINTO
RISER)
PRECAST BASE SECTION
NT AT THE
-- BASE) 1-0 BA
PICAL KNOCKOUT �
MIN WALL THICKNI
2—#3 BA
PROVIDE 18" MINIMUM DEPTH COMPACTED
GRAVEL BACKFILL FOR PILE BEDDING
BELOW CATCH BASINS
TYPE I CATCH BASIN DETAIL
6" RISER SECTION
12" RISER SECTION
FRAME & GRATE I ,— RISER OR ADJUSTMENT SECTION I I I - I
><A I
><
c,0 <
—HANDHOLDS
co
FLAT SLAB COVER
20",(24$p OR
STEPS & LADDER
24" DIA.
><
CD
48" UNLESS
PRECAST BASE
w
T7
DTHERWISE
NOTED.
c
W/ INTEGRAL RISER
REINFORCING STEEL
(FOR PRECAST BASE W/ INTEGRAL RISER)
77
0.15 SQ. IN./FT. IN EACH WAY
FOR 48"DIA
c:l
c�
0.19 SQ. IN./FT. IN EACH WAY
FOR 54"DIA
MORTAR FILLET
'0
4A
COMPACTED GRAVEL BACKFILL
FOR PIPE
"K—
-A
BEDDING, 6" MIN COMPACTED DEPTH. FOR
CID
PRECASTBASES ONLY.
611
1-0
00
FOR SEPARATE CAST
IN PLACE ONLY
SEPARATE CASTIN
PLACE
OR SEPARATEPRECASTBASE
REINFORCING STEEL
(FOR
SEPARATE BASE ONLY)
"0" RING
0.23 SQ. IN./FT. IN
EACH
DIRECTION FOR 48"DIA
0.19 SQ. INJIFT. IN
EACH
DIRECTION FOR 54"DIA
PRECAST
BASE JOINT
TYPE 11
CATCH BASIN
rn-"�
SOLID COVER
RIM EL 418.0'
2 � TYPE 2, 54" 0
C— CATCH BASIN
STEPS OR
LADDER
GASKET (TYP.)
SHEAR GATE
36"0 IN
IE = 411.80
SLEEVE COUPLING
NON —SHRINK GROUT
WELDED STEEL PLATE W/
2.35" DIA. ORIFICE (#l)
TOP OF RISER
416.8
2—GALV.STEEL
STRAPS
2.35" DIA. ORIFICE (#2)
EL = 414.50
2.=31
(WITH DOWN —TURNED ELBOW)
18" RISER
"M AX
"MIN.
12"MAX.
13?M I N
12"0 OUT
IE OUT
411.80
FLEXIBLE
ADAPTER
c-, COUPLING
2—GALV.STEEL
STRAPS (TOP
-�r fl AND BOTTOM)
1 54" 0
FLOW CONTROL STRUCTURE
NTS NTS SCALE 1"=2'
COVER
No. 64-2-342P
1,200 lbs. 6*-8'
-7 ------
'7 - - - -
- - — - I --- - - - - - - - - - - - - -- -
I --- - - - - - - - - - I - - - - - - -
- - - - - - - - - - - - - - -
7-
- - - - - - - - - - - - -- - - -
OUTLET PIPE
WITH SAMPLING TEE
BY OTHERS
FiBERGLASS
HOLD-DOWN CHANNEL
PASE MEW Y 000
No. 660-CPS
6.300 lbs.
6
OUTLET WEiR
INET PIPE
WITH ELBOW
OIL RETAINING BAFFLE By OTHERS
A�l
5*-6'
COALESING MEDIA -
INLET WEIR
OIL/WATER SEPARTATOR
NTS
NO.
DATE
BY
REVISION DESCRIPTION
10/28/97
CITY COMMENTS
8/4/97
PERMIT SUBMITTAL
DESIGNED BY: ISSUE DATE:
WFIF
DRAWN BY: 10/28/97
BF PROJECT NO.
CHECKED BY:
I JRG 977711
--y4wv127
10 32519
ISTO
IONAL
-W trlrvm NP
co
IE=415.6
SCALE: 1"=40'
co
IE=415.8
CID
IE=415.9
I I
co
IE=417.25
AprmwVED FOR
CONSTRUCTION"
CATY
Washinaton Land Design
Planni�n.'g & Engineering
11 A L A
TURNBERRY LANE CONDOMINUIVIS
9709 Third Avenue ME ' Suite 203
EDMONDS, WASHINGTON
DRAINAGE DETAILS
C-3
Seattle
., WA 98115
(206) 522-9510 FAX (206) 522-8344
RING & COVER
WITH LOCKING LID
NOTE:
FURNISH PRECAST SECTIONS WITH KNOCKOUTS
FOR PIPE PENETRATIONS. KNOCKOUTS SHALL
HAVE 2" MIN WALL THICKNESS AND KNOCKOUT
DIAMETER SHALL EQUAL PIPE OUTSIDE DIA.
PLUS MANHOLE WALL THICKNESS.
"0" RING
PRECAST BASE JOINT
REINFORCING STEEL (FOR SEPARATE BASE ONLY)
0.23 SQ. IN./FT. IN EACH DIRECTION
L
NO. DATE
10/28/97
8/4/97--
MORTAR FILLET
nn
114URLIL lmllubl
JUK � I TF)
SEE C-5 FOR PAVEMENT SECTIONS
>< =:�=PORTLAND CEMENT CONCRETE
>< z:
A
r (3000 PSI COMPRESSIVE STRENGTH)
C.0
ADJUSTMENT SECTION
C14, (LEVELING BRICKS OR
CD 2411 GRADE RINGS OPTIONAL)
HANDHOLDS
PRECAST CONE (ECCENTRIC
UNLESS OTHERWISE SPECIFIED)
A PRECAST CONC.
RISER SECTION(S)
RAM—NER FLEXIBLE GASKET OR
611 MORTAR JOINTS AS APPROVED
BY ENGINEER
4R'f MIN
SLOPE = 1/2"/FT (TYP)
A.-
CONSTUCT IN FIELD CHANNEL &
SHELF TO THE CROWN OF THE PIPE
PRECAST BASE
W/ INTEGRAL RISER
REINFORCING STEEL
.(FOR PRECAST BASE W/ INTEGRAL RISER)
r
0.15 SQ. IN./FT. IN EACH DIRECTION
00
FOR PRECAST BASE ONLY:
6" MIN. COMPACTED DEPTH GRAVEL BACKFILL
M
f6 IN 1 0 (WSDOT STD. SPEC. 9-03.16)
SEPARATE CASTIN PLACE OR SEPARATE PRECAST BASE
STANDARD MANHOLE
SANITARY SEWER MANHOLE DETAIL
90 0 BEND
CAP
TEE
45 0 BEND
D
22 1 /2 0 BEND
4 2-3/411 DIA. RODS FOR 10" SIZE & SMALLER
[C2 _ 1" DIA. RODS LARGER THAN 10" SIZE
OAT RODS WITH ASPHALT
X X
GATE VALVE
THRUST BLOCK - TABLE
MINIMUM BEARING AREA AGAINST
UNDISTURBED SOIL SQUARE FEET
PIPE
SIZE
A
B
C
D
4 10
3
2
2
1
NONE
NONE
61'
6
4
3
2
1
NONE
8
11
8
6
3
2
3
10"
16
11
9
5
3
4
12"
24
17
13
7
4
5
14"
33
23
18
9
5
7
16"
23
23
17
9
5
10
NOTES
1. THRUST BLOCKS SHALL BE CAST IN PLACE
CEMENT CONCRETE WITH MINIMUM 28—DAY
COMPRESSIVE STRENGTH OF 3000 PSI
2. THRUST BLOCKS SHALL BEAR AGAINST
FITTINGS ONLY AND BE CLEAR OF JOINTS
THRUST BLOCK
NTS
BY REVISION DESCRIPTION
CITY COMMENTS
PERMIT SUBMITTAL
DESIGNED BY: ISSUE DATE:
WFF
. 1 10/28/97
DRAWN BY.
BF PROJECT NO.
CHECKED BY:
JRG 977711
32619
1w
STEPS SHALL BE INSTALLED
ADJACENT TO INFLOW LINES
INFLOW PIPE SHALL EXTEND
4" TO 9" INSIDE THE MH.
OUTFLOW PIPE SHALL BE
FLUSH WITH INSIDE OF MH.
NOTE: 0.10 DROP IN ALL
CHANNELS ACROSS
ALL MANHOLES
j/2"
1/8" RAISE
1/2 1) WIDE BORDER
CAST IRON RING & COVER
NOTE:
LOCKING LID REQUIRED
Washington Land Design
Planning & Engineering
9709 Third Avenue N. E., Suite 203
Seattle, WA 98115
(206) 522-9510 FAX (206) 522-8344
3/4" SQUARES
SPACED — 3/4"
AS INDICATED —
HT. 1/8"
4" MIN.
GRADE
FIBRE JOINT PACKING
45- (1/8") BEND
PVC SEWER PIPE
CLEANOUT DET
NTS
I
2 1-011
1 1/2" CLASS "G"
ASPHALT 211 0
CLASS "B"
CEMENT CONIC. COLLAR
CEMENT CONIC. BEDDING
---- -— ----- PLUG TO BE SEALED IN SAME
7;
MANNER AS MAIN SEWER JOINTS
1
CEMENT CONC. BEDDING
VERTICAL
ORIENT 5 1/2" PORT
TOWARD DRIVE OR AS
RAKE
RAKE @ 1/4" PER FT.
DIRECTED BY FIRE
DEPARTMENT
2 1/2" NST NO ZZLES
FIRE HYDRANT PER AWWA C502
361' MIN. 24"
co
1/8 CU. YD. CEMENT
2" MIN.
CONCRETE 36 x36"x4"
3
1/2 CU-YD. GRAVEL ------
BACKFILL FOR DRAINS
WSDOT STD. SPEC.D
9-03.12(14)
Lj
Of HYD. CONNECTION
Lo
< MECHANICAL JOINT
m
00
00
0 100
0 00
00
0
0
00 0
THRUST BLOCK AREA
00
. . . . . .
1/4 CU. YD. CLASS 3000
....
CONCRETE
HYDRANT DRAIN
SHALL NOT BE COVERED
k..
16"xl6"x4" CONC.
BLOCK
PIPE BEDDING UNDISTURBE D
MATERIAL
q 11111
Ain 17, 1 � 0 . p 0 . ... k in
EDMONDS, WASHINGTON
FACE OFCURB
2.5'
MIN.
2-3/4" STEEL
SHACKEL RODS
VALVE BOX
6" GATE VALVE
(FLxMJ)
THRUST BLOCK
TEE W/ 6 of
OUTLET
APP-pie
CONSTRUCTIO,vq
V
Ciry ENGINEEF1
VANITARY SEWER AND
WATER DETAILS
C-4
[7— Expnw MY 7,
CLASS 'B' ASPHALT CONCRETE
WEARING COURSE (WSDOT STD SPEC 5-04.2)
r
cli
.,=') ..Q: .: 00 - ' P .. :. ' ". . . v
-0
:0\6�:60-
0. o
-"\CLASS 'B' ASPHALT CONCRETE
LEVELING COURSE(WSDOT STD SPEC 5-04.2)
CRUSHED SURFACING
TOP COURSE(WSDOT STD SPEC 9-03.10)
COMPACTED SUBGRADE
CRUSHED SURFACING
BASE COURSE(WSDOT STD SPEC 9-03.9(3)
STANDARD DUTY PAVEMENT
NTS
PAVEMENT WIDTH 1 "R
1 BATTER
1AT
TERJ
1/2"R 1 R
T
0.05 LFT. FT. CD
V-6))
CONCRETE CURB AND GUTTER SECTION
NTS
5 1
ACP DMEMY'
LM
AEC Nil a 1j;T-'-KT!tkj' a m,:,*
MOMETF40 vezvy RAMP
(7t VVIM SAWLrK)
180 IMNSMON CTyp)
12'
P24
bUTTER SECMN
HIGH TRAFFIC LOAD DRIVEWAY ACCESS
SCALE: NTS
NO.
DATE
BY
REVISION DESCRIPTION
10/28/97
CITY COMMENTS
8/4/97
PERMIT SUBMITTAL
W6 @ 6" O.C.
WELDED WIRE
FABRIC -
0--oo (j6.:
.0
0-
..:60
COMPACTED SUBGRADE
PORTLAND CEMENT
CONCRETE (4000 PSI
COMPRESSIVE STRENGTH
PER WSDOT STD.
SPEC. 5.05)
CRUSHED SURFACING
BASE COURSE (WSDOT
STI) SPEC 9-03.9(3)
TYPICAL SECTION CONCRETE PAVEMENT
DESIGNED BY:
ISSUE DATE:
WFF
10/28/97
DRAWN BY:
PROJECT NO.
977711
BF
CHECKED BY:
JRG
vXw
rm
2 51
)519
9
v's
)NAL
Im 9
4.5 1
PAVEMENT NOTES:
1. MATERIAL THICKNESS IS COMPACTED
DEPTH. APPLIES TO ALL SECTIONS.
2. SUITABLE ONSITE SOILS SHALL BE
FREE OF DELETERIOUS MATERIALS
AND MAY BE USED FOR SUBASE
PROMDED SOILS MEET REQUIREMENTS
IN THE PROJECTS SPECIFICATIONS
5" THICK—/
CONCRETE PER
CITY OF EDMONDS
REQUIREMENTS
5' SIDEWALK
18" CURB &
GUTTER
-10. 5'
PROPOSED WIDENING
2%
5 1/2"
PAVEMENT
EXTRUDED CONCRETE
CURB
18" REBAR STAKED AT
20 FT ON CENTER (TYP.)
r.nmlr.RFTF FYTRI 11)Fn r.1 IRR
1' SAWCUT AND MATCH
2" A.C.P. PAVEMENT
2" AGG. LEVELING COURSE
4" AGG. BASE COURSE
APPROVED SUBBASE
98% COMPACTION (ASTM 698)
ROAD SECTION
SCALE: 1" 2'
8.5'±
EXISTING ROADWAY
EXISTING EDGE OF PAVEMENT
1
2%
Washington Land Design
Planning & Engineering
I 1
L AS�
TURNBERRY LANE CONDOMINIUM
9709 ThirdAvenue N.E., Suite203
EDMONDS, WASHINGTON
PAVING DETAILS
c-5
Seattle, WA 98115
(206) 522-9510 FAX (206) 522-8344
. .........
w
CAUTION - NOTICE TO CONTRACTOR
THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT
THE LOCATION AND/OR ELEVATION OF EXISTING
UTILITIES AS SHOWN ON THESE PLANS IS BASED
ON RECORDS OF THE VARIOUS UTILITY COMPANIES
AND AVAILABLE AS -BUILT INFORMATION. THE
INFORMATION IS NOT TO BE RELIED ON AS
BEING EXACT OR COMPLETE. THE CONTRACTOR
MUST CALL THE APPROPRIATE UTILITY COMPANY AT
LEAST 48 HOURS BEFORE ANY EXCAVATION TO
REQUEST EXACT FIELD LOCATION OF UTILITIES. IT
SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR
TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT
WITH THE PROPOSED IMPROVEMENTS SHOWN ON
THESE PLANS.
NOTES:
1. CONTRACTOR TO REPAIR EXISTING PAVEMENT, DRIVEWAYS,
OR OTHER PROPERTY DISTURBED DURING THE COURSE
OF CONSTRUCTION.
2. CONTRACTOR TO VERIFY ALL EX. UTILITIES AND IMPROVEMENTS
IN FIELD PRIOR TO ANY EXCAVATION.
3. COORIDATE ALL CONSTRUCTION NTH THE CITY OF EDMONDS
DEPARTMENT OF PUBLIC WORKS.
4. THE CONTRACTOR SHALL COORDINATE WITH PUGET SOUND ENERGY
SERVICES TO WORK IN THE AREA OF THE EXISTING 12" GAS LINE IN
72ND AVIENUE W. (NOT SHOWN ON SURVEY)
PROPOSED LEGEND:
TYPE I CATCH BASIN
C-
Q3
TYPE 11 CATCH BASIN
STORM DRAIN PIPE
EXISTING LEGEND:
m
'A 1 k i R?" I I i
'j k I.. f", IF i i ;I I
L V!,, 'J j:.
H I
k1k Is] M I kyj
SEWER MANHOLE #4, L.I.D. #206, SHEET 5 OF 7
FILE 1.990
RIM ELEV. = 419.73'
ELEV. = N'LY INVERT = 408.57
ELEV. = SLY INVERT = 408.47
N 0.
DATE
B Y
REVISION DESCRIPTION
12/19/97
CENTERLINE SURVEY
12/15/97
CITY COMMENTS
10/28/97
CITY COMMENTS
8/4/97
PERMIT SUBMITTAL
....... 0�!oo
422
420
418
416
414
412
410
w;
406
404
402
400
M]
o
I-
6.0-A
— ---------
EXISTING CURB 72ND AVEWEDGE OF PAVEMENT
0+50 1+00 1+50
EDGE OF PAVEMENT
SD
EXISTING CB
RIM 407.93
1E 401.50 P
0-1
C)
C%4
r1i
C14
C)
m c)
C:)
F-=
Mi
C)
Of
cn
AMINTA11i
SCALE: 1"=20'
C/)
C)
C)
m CD
cf)
m
ZE
SEE SHEET C-1 FOR ON —SITE STORM DRAINAGE INFORMATION
. ... .... . .. .............
SAWCUT_ANV(7��)
PAVEMENT!
.... .. .. ...... 13+31.24
2+50 TYPE 11 CB 3+00
2+00 RIM = 420.3±
1 E = 411.5
12" SD
71
><
TYPE 11 CB
z
RIM = MATCH
EXIST19
EASTERN EDGE
OF i!�
(417.5±)
)>
CB GRATE
20' EAST OF
EX.
'n
IE 408.4
CENTERLINE TO ACCOMEDATE
FUTURE
ROAD IMPROVEMENTS
0
:��E
C:)
m
C)
ct-
C)
C)f
LLJ
:�E -
c-) (J-)
W
Of
C) C/)
LL _j F--
C14
F—
Lj_j
C)
V)
CD M Lf-)
in r--:
L�j
cn
L1_
(D
+
W �
(7) -4-
C)o
m Ln
Lri
Ld
C/
C'4
U�
+
:<
LLJ
r4-)
cn U-) C-T
t-Li
+
m
C) C.0
L.LJ
><
f I
Uj LL,
C L F5
E
C—)
m a: Lij
EX
_nNG (RADE @
EVATERLINE-\
1.00
L --- i
00
qo
. . . . . . . . . . .
c
0+00 0+50 1+00 1+50
72ND AVE W PROFILE
DESIGNED BY: ISSUE DATE:
WFF
DRAWN BY: 10/28/97
BF PROJECT NO.
CHE KED BY:
JRG 977711
2+00 2+50
SCALE: H: 1"=20' V: 1"=2'
3+00
3�50
Washinaton Land Desi'jzn
Planning & Engineenng
TURNBERRY LANE CONDOMAINIUMS
11 A
72ND AVE. W. STORM DRAINAGE
9709 Third Avenue N. E, Suite 203
Seattle, WA 98115
11 A
EDMONDS, WASHINGTON
EXTENTION PLAN
C-6
(206) 522-9510 FAX (206) 522-8344
ME
10110
422
420
418
416
414
412
410
m
5LF 6" SS
@ 5.0% —
SS ENTRY----,
IE=415.87
I
10
I
IbIx
00
39LF 6" SS
@ 1.0%
0 4�i�
30+00
F)"Pf) I
L 9LrF6"7'SS,
@c SS ENTRY
j.U/0 IE=414.96
BUILDING C
10+00 10+50 11+00
PROFILE A
NO.
DATE
y
REVISION DESCRIPTION
4/8/98
BUILDING 'A' REDESIGN
10/28/97
CITY COMMENTS
8/4/97
PERMIT SUBMITTAL
DESIGNED BY: ISSUE DATE:
WFF
DRAWN BY: 10/28/97
BF PROJECT NO.
CHECKED BY:
JRG 977711
La
t 10
wel
2519
I V 091
I V 00-1
PROFILE A
145LF 8"SS @ 2.67._---uj4e
15LF 6"SS
r",Pnl
6" RD�[.
40,500, TYP. SS ENTRY
IE=413.21
BUILDING D,
PLAN
SCALE: 1"=20'
422
420
.418
416
414
412 ,
41(!.
0)
Ij�
mz
c\j
11+bu 20+00 20+50
PROFILE B
SANITARY SEWER PROFILE VIEW
SCALE H: 1"=-?O'
V: 1 " = 2,
SS;6
RIM 419.7
11+46
422
420
418
416
414
412
410
w
##CAUTION## NOTICE TO CONTRACTOR ##CAUTION##
THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT
THE LOCATION AND/OR ELEVATION OF THE EXISTING
UTILITIES AS SHOWN ON THESE PLANS IS BASED ON
THE RECORDS OF VARIOUS UTILITY COMPANIES AND,
WHERE POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD.
THE INFORMATION IS NOT TO BE RELIED ON AS BEING
EXACT OR COMPLETE. THE CONTRACTOR MUST CALL
THE APPROPRIATE UTILITY COMPANY AT LEAST 48 HRS
BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD
LOCATION OF UTILITIES. 1-800-424-5555 IT SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL
EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED
IMPROVEMENTS SHOWN ON THESE PLANS.
30+00 30+50
,PROFILE C
APPROVED FOR
4 HUG I luill
(AMS i CAUTION
DATE: 0 lqq.!g THE CONTRACTOR SHALL COORDINATE WITH PUGET SOUND ENERGY SERVICES
A �OOWORK IN THE AREA QF THE EXIS-nNG 12" GAS LINE IN 72ND AVENUE A
N T SHOWN ON SURVEY)
P- -%4,AIAS I
Washington Land. Design
Planning & Engineering
L AS
TURNBERRY LANE CONDOMINIUM
9709 Third Avenue N. E " Suite 203
EDMONDS, WASHINGTON
UTILITY PLAN AND PROFILE
C-7A
Seattle, WA 98115
(206) 522-9510 FAX (206) 522-8344
f"o
**CAUIION** N0110E TO CONTRACTOR **CAUTION**
THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT
THE LOCATION AND/OR ELEVATION OF THE EXISTING
UTILITIES AS SHOWN ON THESE PLANS IS BASED ON
THE RECORDS OF VARIOUS UTILITY COMPANIES AND,
WHERE POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD.
THE INFORMATION IS NOT TO BE RELIED ON AS BEING
EXACT OR COMPLETE. THE CONTRACTOR MUST CALL
THE APPROPRIATE UTILITY COMPANY AT LEAST 48 HRS
BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD
LOCATION OF UTILITIES. 1-800-424-5555.IT SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL
EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED
IMPROVEMENTS SHOWN ON THESE PLANS.
NO.
DATE
BY
REVISION DESCRIPTION
4/8/98
BUILDING 'A' REDESIGN
10/28/97
CITY COMMENTS
8/4/97
PERMIT SUBMITTAL
SCALE: 1"=20'
DESIGNED BY: ISSUE DATE: K. C - Washington Land Design
WFF 10/28/97 WA Planning & Engineering
DRAWN BY: ' z 0:)
BF PROJECT NO. k -- 9709 Third Avenue ME, Suite 203
14 Cl%,% IA/A 01111 C
CHECKED BY: 32519 L"'Ut
977711 IST - (206) 522-9510 FAX (206) 522-8344
JRG 1014AL
-W wv�"'p
428
426
426
424
422
420
418
416
414
412
410
I ME
40+00 40+50 41+00
PROFILE D
SANITARY SEWER PROFILE VIEW
JUL AS
TURNBERRY LANE CON"DOMIN IVI
EDMONDS, WASHINGTON
SCALE H: 1"=20'
V: 1"=2'
APPRC-4NED FOR
C)ATF,---Akn'1 /,a:g
CITY ENGINEU1, 9-7
UTILITY PLAN AND PROFILE
J�Qm#wgl
EXPIRES JULY 7, 1998
......... .
t
16
- ------ moor_ - -------
�H 2 41 21 6 I E
F. NOR R, .4 1'^
0 f BEA AT)
'4,' E '(P L
4
D '7
24 D D
D
a A
LEGE"D:
LEGEND'' IN
0 8TH,
SANJ I �V�Y SEWE
fTYP1QAL)
ATION
'ATC H El A f SPOT ELEV
S TO RA I N 1-11,
425
6.9
ol- RIDGE LINE
E I CATCH BASIN
.6
C-3
L. F:.,P- I- i N
4
205 H
8 , I E TYPE 11 BASIN
SEE. ARCK., PLARS,.,.QQR.'
w 17
0.
RD6 00
YARD DRAIN
PC 7 E. Co M,
t41?
�'BUILINNG:
BUILINN A -2
TRENCH DRAIN PER U" LT. CO.
ILITY VAU
FF 41
7.5,! 41 Z
42
4p, ING C 0 T 41. f
EX V
ISTJ��G rt'-) 83 E REM() ED
ARE IN
6p AKI f�. I C
474
4", PVC TO S RM
420
0 1.07. 4Nr�
----AREA DRAIN
AR -DRAIN 41
EA
CONNECT TO
CONNE%j1
c: 4 tjv(;
@ 1.0%
77-
4" PVC ' N,
4 it
417.$ 1.4 417. RDL,�
SD
7
-'Q
2
417,6 V. I
0 1.0%, , - / . I I - 1 .1 9 - �ff
C. 0.
Rr s r.rf 4 Pulk<; 77
12
IE 416.75
R
UWEY' CAP ST xmPED
10
v "HSA FLS. 29'82"
YARD DRAIN
c.a.
E' 4,16
v3.3
- - --------- -
444
.0 IMP"
1a4
BUILDING -,B 4as
l4
0�
Ina I A
NOTESIN
1. THE DESIGN SHOWN'IS BASED UPON THE ENGINEER'S UNDERSTANDING
OF THE'EXISTING' CONDITIONS. --THIS PLAN DOES NOT REPRESENT A
DETAILED FIELD; SURVEY. THE *EXISTING� CONDITIONS' SHOWN ON, THIS
PLAN SHEETARE BASED UPON -THE SURVEY FOR'SCHOEDERARCHITEcTs,AiA
7,PREPAREDBY'HEBRANK, STEADMAN & ASSOCI ATES, P.S.. DATED
DECEMBER 1996.-.THE CONTRACTOR. -IS RESPONSIBLE FOR VERIFYING
FIELD CONDITIONS PRIOR- TO. BIDDING THEPROPOSED SITEWORK IMPROVEMENTS.
ARLDISCOVERED,`_THE CONTRACTOR SHALL NOTIFY THE
OMER PRIOR, TO ASTALLA11ON, OF ANY PORTION OF THE SITEWORK
WHICH WOULD., BE - AFFECT,%
2. THE SPOT �LEVATION, INDIC ATED ON THIS PLAN REPRESENT THE
DESIGN TOP-,OF�� ASOH ALT. GRADE,',UNLESS OTHERWISE INDICATED.
3. ALL UNSURrACED- AREAS ARE, TO" RECEIVE FOUR INCHES
OF TOPSOIL. SEED MULCH AND WATERED UN1711 A
OF, GRASS IS OBTAINED.
Y STAND'
72ND AVENUE* W
418.8 HEALTH
ff]
SOLID LOCKING LID
�Aitk R--�.
STRUCTURE SCHEDULE
C131,
TYPE
R114'
IE (WT)
1
413.1
1
-417.1
.;1413.0
11
412.5
:,(4)
11
417.6
�`412.3
11
.,417.9
'412.0-
11*
418.35
411.8
'(D
FLOW CNTL STR
4177,'
.411,8
I
4t
..413.0'
�!6.9
412.�
YARD DRAIN
11.
417.2
413.5
TORY
L q
WOOD' FRAME
T.,
418
FD
tj
E
11 CATCH.
TYPE BASIN
iA_
4185
_�TYPE
41 �7
1 ATCH BASIN
I t
-3`
q
PVC .0'm
�C-V (TYP.),:
V
4 7.2
J, W,
FE.NCE. 0.61.
N
9
m i*,
5
Ny
- .4io
�14
Q
6' RDL-
PIPE SO- HEDUL5
PIPE
DIAMETER
-LENGTH
(FT.)
SLOPE
(rT. /Ft
8*
11
-0.064
Fil
8*
88
10.005
80
i.0.005
F4�
12"
55'
.0-005
101
.46
F6_�
60*
55
0.000.
12"
5
87
95
26
0.007
nil
40.
0.013
[172
."40
0.081
F13�
6"
101
0.037
4.
ALL,UAIIUH.UA�SINS AND., AREA DRAINS ARE TO'BE 'SITUATED
SUCH THAT'THE OUTSIDE EDGE OF GRATE..FRAME.IS AT, TOE.
OF CURB (WERE.. APPLICABLE).
5.
CONTRACTOR TO - GR AM ALL, AREAS TO PRECLUDE, THE
PONDING OF WATER.
6.
STORM. DRAINAGE. PIPE WITH LESS THAN 2" -0" COVER
SHALL BE CLASS IVl REINFORCED CONCRETf PIPE$
OR APPROVED EQUAL TO SUSTAIN H 20.,COADING',
-7.
ALL ONSITE-STORM DRAINAGE PIPE SHALL BE SMOOTH WALLED INTERIOR,
MANUFACTURER'St VtRIFICATON OFAANNINGS ROUGHNESS
I N n= .01-2. OR LESS. ADS-N-12 IS.NOT TO BE USED.
8.
-4
CATCH BASIN INLET PROTECTION EROSION CONTROL TO'BE
.'USED FOR ALL NEW INLETS.
9.
CONTR ACTOR TO CONNECT ROOF DRAIN LEADERS -TO PROPOSED -
STORM DRAINS 'AS SHOWN.
10.
CONTRACTOR TO REMOVE UNSUITABLE SOILS LOCAT
BUILDING SPLAY LINE OF THE FOOTINGS.
.�GRAPHK;, SCALE 6"
%NK
F OW CONTROL!,STRUCTURE 11. THE CONTRACTOR SHALL COORDINATE WITH PUGET, SOUND ENERGY SER'
Sl*.
I SIV;
NOT SHOWN ON SURVEY)
416,2
FF 416,2
AREA '.GAS* LINE IN'72ND AVMUE W .
0 �WORK, IN1HE -OF THE, EXISING lf-
80 DmG.,C,
40
BUILDING, E�
7 FF, 418 2
FF 40.t*
JER-�
/WA
K RET
1 01
cix SER,AkAtO
�C
o -ccs Z.,
Ft A CONTRACTOE'
t/i - - ,CAUTION. NOIXE�
I inch 20 ft.
4' 7.
.4
X,
THE CONTRACTOR IS SPECIFICALLY''CAUTIONE0 THAT
_r Ili. z
THE LOCATION 1AND/0R ELEVATION
4_
7
UTILITIES AS S tIOWN ON THESE'PLANS' IS BASED
1 7' Y COMPIAMES:
04 RECORDS OF TK� VARI0U$,?'VnUT'
";,�v i�
'y" , I Z 'N' 1-. -1
AF
'p L Alf t 7.
E �f u wc:1,1F AND �'A AS:�-BUILT, INF THE
.10
BE RELIED ON AS
�1 8,i.od!�, c MT�
NFORMA11ON IS NOT. TO,
1 4 �A.
`SHE
JHE CONTRACTOR
�BEING EXACT. -OR COMPLETE.
T
A -A 4
t IN.
i4 TORY. 10
T RM
UTILITY COMPANY AT
4m
VW00 FRAME XTENTIONI
SW -!114, 0.0.f 6,, SPEr 5 7
E I IF
.,.MUST CALL THE APPROPRIATE
LEAST, 48 HOURS BEFORE ANY EXCAVATION 10
ile,
4'
73'
V IT.
4, p � � " jj.,� ��k, -
TIoN OF� UTILITIES
kr
I -_Oik 4
`i4,08 37" REQUEST EXACT FIELD tocA
RESPONSIBILITY-- OF THE, CONTRACTOR,
BE.THE
s f_ T
SHALL
4
t
JO, RELOCATE. -ALL EXISTING UTILITIES WHICH'CONrUCT'
V.,
S
5
WITH THE PROPOSED IMPROVEMENTS SHOWT4 ON
THESE PLANS
Alwl, "'gi
_2
J
i J_j
,,NO.
�TE
.:'':,B,
.........
R V1 S1 ON,' DESCRI RTI ON,
198,
'BUILDING A"REDESION,
SECOW'REVIEW't
1049/9 -7
CITY 'COMMENTS'
8 7
PERMIT SUBMITTAL
DESIGNED1, B Y:
"ISSUE-DA TE.
MT)
1 0/28/97
DRAWN ::BY:
Ino
PROJECT NO.'
CKE,
'77
- - I - - , � I . I 11 I .1 i � 11 .'� 11 . �,: . , I I I , , , , ! I I � "I - . _. , . . I . I� 1. . .,i, i l , 11 I � I � I . � . � . . . � I . I I , , ,
11�, ,� `- e -,,"', I I . . . 1, I'�,. � �� ,:"-,,,, . , I . I I
I . % .. I , Z, � � , , � � , , , , , � - I , " I I I � , - � ' � , , � 11 I ,4 I , I I I , " " " , � " . � I . � � I ,J I � - � . a I � �., . - I
, - . , ., , I% I . I .1 I . 1. I I i . - I , � ,: I , . I I . I I . � I . .
, I . , , " , -- , '- - "" 1 ,t;'. I I I I I . � � I !. �� , . 1�,l . - 11 I . I,: I. ,;.. I 11 . I I . . , i . . � I � I - -
� ,;�� , � ..", . , " �, �.li.'.`_4�� l!" - 1� _: , - 1 1 � .; I . . I � �� , , I , ' I 1, 1, , '�, - , f , I � i I . . , I . I .., I � . . I . I . . . .. I I � I I
e ; , - � � " - - ,, , � . I ', !, I I lk� � t ;1� � f� . I . .1 .
, � � !� , *i 4 , , . .. ., ll l . � L I , 1�1 1. 1. . I �
, , , . - � I I I - - I 11 I ______-"_1 I I . .. , , t: : 'it � .- , , J, , ; I I - � � I �, ��'6 �, -, l � i . ?, 1 : ; , jt� , I , , , , : � . I - .1 I 1 .. I . I
I . , , I I 11, � I ; � , . ., , � I I � , - '. - � . , 1 . , , ,�' , I � , I - ., - , - �; � , 4 ;, ", �', � , . 71, 1 1 � , ,'. 1 . � . . , , I - -,, , , � " :� �, 4 t
I , I , , � � I I ___ _L____ I �� �, , .: I _ � ,,,,, ,� I. I �. .4 . I . . I I I 11t, � - (I � . , ,1� I , ., t
11 i . I . 1; �, - 1* I , I I .,. , , I - I . ; ;t_,�� -_;t . , , 1 11,11. f , 1, I . , I � I I . . . '� - . . I . 4 - ; .j , t , �, I 1 I , .: . . I m I I .. I . I . . I . 1. , �, . , '' : , 1. . I
� '. �� : '�,�, ,,,� - . , � . I , . i� i � � � .
: I - I , I I . " � w � , " , � I � , , , � ! , , �, � ,, "I � i w - , , I , � I ' '! '4' `,tl'l * :' . � " I I .. .. � " F i , - , . � I I , , t (� I , 1, �� I f ; � , . I , . .. I �., - -, I ! 11 �� , .1 11 .1 I � 1 I . ., . I . I . I . . , * . I
, - - ! k , , . , I , I., I I - , I 11 . 1, . "I., " , , - I � . ., J" I' ,, I , ,I: ,
I I � I " . " ., . I , . I . " , , , �. I 1 2, , . j I � - 1 I I - '0;0 , t , , , I;,- I � ,,,, j 11 f I -. 4 , �'� f - - � , I 1, I I I flt,i I, . , I 1, - � I I : , - I I . � I .� I z � I � I
I I , . � � '. ,� I I �." k I "I 1, I I , "I - -,. �, .., ", ,. I j _.,� , 1. ,,, � " , .. , , I I I , , , '. I . � I I I
11 -_ i - , I -1 , 'l, ,� �."K ,: :, "I" - � , I - - . 1, _ , t, , "'. - , A �_" 14�1 I . 1. , I 1. I I i . ��, .1, , " - - . ,,. .1 . , .� ,,, . 11 '. I I . r , ,,, � I �
I I , . I I . I � I I 1, , , 1� t i i I 1 , . I , I ; t'l t 4 �l ., !. . � � , . . - . . I . � I . . . I . h . � I . * I .
I I I . 1 '4 , . , i - � ,. . I 1, 1� ., I I I � � I , I . I . i . C, . . � I �. I . I .
. , 1 -w4' - ., 4 ,., 4, , . I . - . . . I I . . I . �
. ,. !, 1, . � ��144,;, . - `,- -1., � ,- �* " '. ., 1� , 11 I .1 . .1 11", t , � I,W�� ... - , , , � 11 4.10 � -1 - . �, I , , ; , . . � I � I I I
I
�, � . ., I I , . 1 , : � �, . - , , , , " - , I , `� ", - '.1 , . � , , , . !�. , : I I , I , . � " 1. , ., � . , 4 ! , I ` -
I I � , , _ ,,, � � � , , . ., , �i ,., � 11 I I , t , " I , , , " ? , , , ) �, . , I , 1,�. ,�, -, i � , � , , 7 1 : . It f . I . .. I
5 I i �,�;, , , , - %, . , i�' � l r I )If ,,t,' , a ,�, ? � , ,�. :it � , I ; ,V', , " " I � I I it I�,/ , I , I t . I I , I I . , ,
.� - , ! ,41 - , ;, � . - - I � I r � r Ill , I I I l . , , . "" .., , i : 1 . I I � I I - � . I I . . I I . . . . . I. ;. - . , -
" ; , , . . - I I -, � l � I . �, I . I - 4� . I '.. It,, , 4 .( i I � ill , " 4 - 1, . � , : I . I . . . � I � 1, I I I . . .. . I I 1. 1, � I : , , � �
� . % .- I I . - :'� I . , I , �,..,., '. I 'j�,;, - , - 11 . � I I . __ I �, i _�� I - I , i'l . ,.,�,, i, I * � .0"I � j "'o . � , , 1, I 11 I , �, . . I � I � A I I . . . . ,� 11 , I . . . � . � , ': . .. . . . I 1 . .
. - �, , '16 � ,� , I.. . F I ,1 - , , . , " . I,�. `1,4w" , , " " - � , ,
I .11, I 1,11,11,11, " l I . , li I - , , , 1 . : . I i " I . ,��
. , " " , , t �, I I., � I � : , " - - , .: , I I '. . � I , . ,
,
,
� , , � . .! � 7 � . I � , �i� - '4 �t I
, I :1 : I I . I , . I- ,ftil �7 : : 4 '! " I It, l � .,, I iv., k , , J. , 1, " I � oi,�.F,f ,v - �t. ,. � k .
, , I - ,,� I -.;": 'i,-,�,_ ,,�, , � ,
� 11 ,� �',. , _ ,; . . . t4 , � -1 �$ 7 r % .,( . , i
I . . I , �',1-,:"`,v , :, .� , � , , I , � I , 1� � 'l I I ;t. , , , I, ;1i .."P I I
I I I I .
': �111 .1, .: * , I � � v . , ; - ". ,,, i 1, . , I .. I i ,
11 i , I , i ,I I 11 . _ , ,,j :� 1 , 4�4o'l �� , t1,,'A` . . . ,
- , �, i I ," ,,, , , , " � , " I , " �� .44*744 , , I- 11 ,',,:- I 4, �., 1 z I f . , ,t . � ", � . I - 1, , . I . . I . I I t .
- . � 1� I 11 "I * I , .�, ,� ', . I .. 1 I . "�,*f , ;', � . . I I � I - .
,
I I , , � ( , � � , �. � - , ".. 1. I :� 't, , I 'i - � , , !,. , . , � . I I . I �1 ;� , lit �, ': . - , 4� , I ". . I IV . , I ,t ?, Jr I ,- mmommo I I .1 . iK .1 � �, � ,; - , , .l, � ", i , ,I ,�,,, . , . , � � I I il � : I ��
� 1� � , - ; � , I, . , t 1:1 . " I 11 , , - . , ." I I . , I - , I l , ),('i -, � ,ii, I . , )z", I , , IT -I � , I I . I I I I I I � I � r - . I I I t
I;: . I I � I �. I --- -I! V', -
� �,kt , , 11 I I l I I , , P , I . I I . . . �,
I 1. 111.1 "I I �_ - I ; 11 x4 , , , I 1. I I I , I , � � . I
I I, . I ` � I � : , . . ,,, � � I I . I ,� , - , , . , 11 I - I �: . " ". � , c . " �1. � , I I 11,11 . - , =� - I. �� _ --..--- I x . I I - - .. I I ; � � , , 1: 1, - - . - - - I . �
I
I , - ,,, i i. 1 I I . . 11 � . . I I - � ,. w I - , . � , '_ , l9i A', �'__ .1, , I I . I., - , , - ;sli ; ....- I I I _1� � I I �, . N ;� , , . . 1, q - i, I
I . -1 � -1 I - I I I I . . I . , , I , " , � � I I x "I, ,,� tv.,, et 'i 4 : ,�� 4d.6.. - I i k, � _ - 1. 1. ammemmommomm I . . � . . I I " � I I .I .�,,.
", 1�: 4 , " " - - __ - -_ -_ 11 t ,, - 1. '11�. 1, � , . , . . I I I '. .0 � ,4 . � I I . I t , . I , . 1 7 1 . � , � I . . - . . - . I - � - � . I .,t :1 I I I i
, - -v - ,� 11 I I , F. � , . I i v,,_ � . , . I I � � ''I ,, � , , I ; I 1� I . I � I I : I I __. �. - I _1� - � 71 ; , .". I
,
. 1 wow-0-4 '41,t" . ,.; .... 000�" , I ,, 'g I ; 11,101111,01 I - I 1-1 I i � Im . . �. I � -o! -- $ . I .1, I . . 1 o.,�*! !!,�.!! , - � 11 I I l 1. I � � . . I I I I . I i I I I - I .. 1: . . "I'll .�
� I __ -, W 1 1 1� I 1 7.1 � - . . . .. . I I . � I ,. . " I � I , ,* , - l I 11 ., I' I I I I 1. . . ., I 1, I , .i " ,:l ,-. i" . . I . .
____ ; I , 7, , 1, 't. , - 1, , , I , " . - _ * , I . i . I .,�.- - -, 4, .T.. . ! , � I , '-4� � I , , � . I . I . . I . . . , , , , . , . 1� . , ,
. I " � � � 1, I ", t . - I ,,, , � �,, 1 - � I *� ., , �, . I '. - - " , . . � . " , I ", , I , � 7 1.4- , 'r - �,, ; illy A ? I � �11 "'it - I I . . I . . . t � I � ; . , � I - , � � : - " I , , .
I . � ,,, , I "'�b ,i �, I , -, f- , 1� , 'i " , � ,� * . - I 1. I v � I 'it" - . - ,,, , . , . . . , I . I b - . i I
. I � �, I ,� . ; � : . I :k% I I I . 1. . .. .. p 4 - , .. �, � - - . . , ., . � , , . * � "' 1�� i r. 4"I 1 , , i If � , I I I I I -4. - . I I # , I , ;� 1 , " ,: ". . . I I * I ), . I I , . I ,.I ,�.
� t .. " ,�. f, " - . I . It, 1; � _ I I - . ,,I -. � . ;, -'I � ..
� , - : , , il "! , , ; .i � I , I .. ? l, , 4 � �� ".,� ,� . : , I.!, , 4, '. - Z, '' , .1 �, 'T, � 1 �tl I I J�,Vjr),,i I . .1 � � . I - .1 I y I I . , , 4 I .
. '!t-, � , , - I I . , , , , , I'Ir � ; � I t -, �, , � , � .� - ! " �, . , -o! ! ,I k, e
�� I 1 1 �,j . # , . . . l� i, , .e *,, , I' . I , � , .. I', , . � I I , � ! 11 I I .. � I . 1. ,
I , , I I I . . . . . I
I 1. I , :, , , '. - " ! ; I � I I - . I � . . I . I ! I .
� ; . � � .." l , , , 1. . , .� " !, . . I I I I �I . � , � 1. . ,, , ; ii , I � ., � I . . ; 1. I 11 I .. . I - , .� 11 I . .
I I - : ,�'_ I , � ,. J I . � ,
I � 11 , .� . l 4:�*,, -, �,, ., 'k , , - - � I � % , - I . . I l I " - I , - . . ,_ " ". .. - ." 11 ! �1'01
I . � .I, I I ., . " . , . _ " - I . , - , 'I, I ,I " � I , I I . ,
I � . , � I I I . .� W111, I . � Ii;, � .�,�-' � �. ,-,;�,,,� ;�,_ , . " I . " � , ., � .., I ,:;e, �, I ..
. I � I I . � .
� , I , I . , I �., I I 't � . . I 1 . I , I i� ,4 , , 'I :t I, I I I . . . . . I . . m I � �:l - i-, A., : !.": ! " .r� � . , 1p 1" -
. , � � I I I . I � . , , " I 1. . . i A . , , I I , ), 'Ik � . , , , I ;! ) I I 4 .1 � , , - ; p , �1, ", � 1 1
t11 , , . , I 1. � I � . , '. * 1, �'!� ,. . ! _11 ,�,:, ,, ,* ,,�, i. ; 11 _,_�l "I I I I , " , ". , , , I ., I . I . 'I - . , , ,, �. I, t, i,., , , � �-A'I i, t I ,, ! ", I I , , . . , � .,. . iit. - `_
; 1. ,� I -, . � .. t,*� � � , � :; � - .1 14 ". , , ? ik", I . .; , � � 4 ,ii � �� "!"t l'o, , I . . . I . . � �
.1r, ,,-,,',, - . . � '. - " ,. .4t r. zj -, .�, " f, ,� , t .. 1� A ` , ?, I T �, , i . � .
, ., , , , t , I I 11 �3'4 e, , ,!, *, "I 'y " 4 . I , I x, , 'f ,ir , t " I _ . . " . �ii I , � I �, ) �� , ", I I ". � - ok ! , I 1: I 1, ,q f ( , " , I I ,, ; , I I ,i " , � � .1 . I ..'r .t � 1 ,
I I ".,. 'll'.-I I - ', .. "o . � I ..!�,,�� t I . , " � .- . , , , '! ", � �,': '_ � . I '. I " , I I ,. - I . - I * I . % I i� I , . !. , I - _� I � I ; � - I t �� I , ,� 1, . . . 11 � , _. . I . � 1. . . % . . . . .
I I j 'i� , , ,I , , � .. i I � .., � , . i . '. I �.. I
. , I . I h , " 0 ,,. � X I , ji �� . � I . , , I I to I , � . .
�. .., . � I �.,�i.iili � '. .. , - '. . 1. I .. , - _ , I ,� , , I � �,
- . � -I' I . � -lit, I , 1� , ,il 11 . � � I , I , . , , I , , I i I . " - I �) '. . I " � � if I . I . I '. . ,� :
� � . . ':1 " � ! � " '. * - I ii� - �, - -_ _A � 4 " 1, - .. � - '", �., 10410, �,, �. lt*� � v -� ,41� � 4 I 1, I I 1, . ; . . . I , I .. . I , � � . ", � ., .1 I I ., 1. , . . . I , .
� I i v� � . I . I . I .. - _� I , $ . , "-I..., Will. , , . 'i, - ,I� . ." I - 4,� I I " , ,I �, .:.� � , '. I .1 . . , �, .1 ... . I . v- , , ". , ,�' .1 , . I . .. . . I I i
4�� , ,. - �, v , , 1, �, . I ! ; ,) I I I I . . I � .
, , , V, �, p I , . . I I - I , 11 , I . I .1 - � " I . I I I . I I - I - - , , � . I � �. I . . . I I i
, :., , . . I , I ) ,., . , . � , I I .. I I I * rt" 1#.. , 'a ,,, � v , kiiil-o ,;. , ,it � ., . . I � I t I I I ?I
,
� " I ... I � I ,� � , 4 I I : . ,�. �, t � I : : 1. I � I . , . . . t .; . I � .1 , . I . I I . , I I � - I , . . . � I.., I. "I . I �:, .1 , 11 , 'JI 4 � .- ,,V , , I I , I, 4' - , , ", �: , �*,! , $1 � jl�kl � , , , . , , , ,z "I � �1' I lt� 1. ;,, -, , t . , ,j ,,, , , " 7. . , .- 11 I I � - .1 I. I 11., , �, .. . I , I . I , . I . I . . I I I I . � . . I . � . , . . . I . . � .
. I , . 4 1 tllw.�, I I . l� ,. � .. .
- I ,� � � . . ? r, 'I . - I I it . �v. tl'�Iw. 1k: . � � 1 I I I., 4, ., I - , . .: . . I , . . I
I � .� . I ; . - ., . . " t � , . -I, 1, � " ,", '_ i" ,� , I . I , .1 I I '. � - , .1 ., , is' , l , "i, , - ,� � , ,,4 , � - I . I . '. I -1 . 1. '. . . . I . 1, . .. 'I . :, , - - - . . � I . .
. I . - I - , � , % . . P " 1 4 1 1, . , . , , � , � � , , * ,�",- "i e. i. 0 -17";. it, , , It I � � , I , , � , .'. , . . I � I 11 . I , !
" , - ,
, I
1, ;J. , v " " I � i., , . .i , � . . � . I ", I , , " . I � - . - , '. .1 � . I . I . . I . , '! , , 4 I
� . ,I r, , , I I . I I I � , , . _ . ? � i . I . I , - . , ". � I I I I I. "", A' , 't � I " I I , 11.1 . , . � ., .1 . . I , I . i .. " I .
I , �'j'� - , , , :, I . '�- . � '. I ,. ,.: I ,� . . I. , , �` " , . , !. , t �, , : , '. . , P. �v ,,I , 4 I � � '.' . .: ,� 4 ,r 0 � , � '"14",'Vil � "141', ,- I., L <-'s 1 ' � . . ' I - ..", � . I
I . - ..i, - . . �, I � I �", 1. . , I I I , � , .. e: �i,� ". . t �, - - � I - 1 ,.0 , , ' , , � � . i , I I .�'. I . I I . . , , i I
i : , I I I . � .. _. .1 ,.- � :, . I .1 , , , I I'A $ ' *4 , , . I I I I 11 , . . � .1 .
� ' � ,�� !�, ... . , , , - , � .1 ,-� � , , , J;;i �q ; , ". I, ,,t.111 t, , . . ,., ,� , I , _1 I . I I . 6 v4 . - � . " . I . I , . , . I I N I , . . � . . .
I I 'i", , , , '�. ... I. .1 ,'f'w,. ' ,,, 4 IV; ( I , 11 livr A, � k� 1,�� 1' I v '. " � .. I
I I I ;.�. ,V, � � ,,-�i� ,.'it, �. _ , . _,, .1 ...... . i-- I ;. '.. _ "'. , , . � _,.:', _.� 4, 1 : !_ . _ it I I : 14,; � " - -1: ) � � , ii, � , . I I
r I I , . 1�1 M," , :,. " _4 ::: � � I I � " w I
, .1 . I - e " ,- . .1, . .. �!��, -� , ,..;�� I 11 .� �; � ,�
I � I , iCl .., k t��!: , I . . , I I I � �.� i ". , 4 � I I - � I t, ". , � � , ,( ,, _: I - - - .., I. 1 , , , ., � I . -, ", I c . - , � , 'i I , * I I " .,)
.
,* I , I -� . . , I � A . � 11 � I., . , , I I . ,:. I 1. 0 4 , , �. , , . I I f . . . . � 1 t, - - �* oflk ,, , -, - , I 1. : -1 *0 " �' .. 1. 1. 11 ,� 1 , t , . I I I : � .
I . I .. . � , :"�; '. , , , .; , , ,, , I , � . I : I � . ! : , s . . . I .. - - I .. I I I I . I
t , . I . . . 1. I , � . i, I I �,,!kl � , - , , .. I : I ;�,, . I t . , , . I �, I " � "I . .1 . . l , 'l, 1� I 1� I I , � � ; 0 - . 1, r � I � I t� 1- - I, *. , '. , � , ,., I . - -i , .1 I j
r " � . " ", * . ", I � I I " ," i I I I , . I . I . AWN.,:-- .. I I . � ...
. I , ,tri, -7 , � -.- � " - . . I . 1. . .. � , , * , � . " , 1 �, 11 I - , 1, . � . I .1 ,. - , . i . I I 1 7. p_, �. - - ,,. . - _- 1.� I . . . . �. , � \ �; , f.� . 11.k, - -
� , - � I I I : I . I It , I - I ____ .. l, . _ �_ i ... .1 � . .'' I .. � ,, , " .. , 4
� - .. i. 1. - I—. .""'' _.-I , ,.-I : � it , 11 I ",":. "t'. ,� I t 0 . - I I � I I, I I . SITE STORM DRAINAGE INFORM . . , � %
r � Z� r" -, , . - , ,.,. � - it I I I .1 I . I ti! -� - , I I .. I - , . t,i . �1�1 ... ;,,I � I.. .Ilslj ..A.� I I- C4 " , � .. , ;, 11 ... ,
""I , � , " I .t . : p _ � , I . , . _t'i
. .1 . . - I . � � ,f "; ., , . I .� I I Y, -7, , 11 1 4 1. f , 1. , _ � I' I 1- _�, l: . j .
. I . , : . "' - 1,11'.".-., I ", �V_ - 11 , � It.& T I . � I . � � ..., I �� . - - . -,, , � I 1! " ,V 1, �. , , '. �_ $ . . ; � . I . ir i. 11 I �, . - ".j � , .;
. . , I , I , , . � , I I 4% , , , I �- , I ! R7 1 - - �. ,_'l.__. -#.� � 1, - it, I -
�11, :Oi� , ��, ., I . � 11 ''I . I o I 1, � , i I I I i , � 'i, � � . I I ,� " y Y, � 1, . , , �o.�,, r � . , , , . I .1 , I , -, I . . I '. . . , .
t I . , 1, , . , "': , � � I , `� . , 4 !7` f . I , : ; , i � , � I - 11 - I., ;. � .. '. I I 11, . : , 11 i: , r., I 0 . t .-- I I . r
I ; - , :1 I -, � " , .,; 1; *." 1 " ": ;, ,;, ; -" .1 - *: ,; , , * , , - . . ,1111 - . � #y 1 - . I �,,, 1, " , I . �
I 11 � . ,� I �11i!� 11 il.- , I I I :11 I.", -I' .1 . , I : "., � - ". � , , I . I , , , I SEE, SHEET, * C I FORt ON � - , .,. � .A
I I !, I . - : � . I , I : � . . i - - , , . , , . . - , � ,� : � �j I " , I, . � - �', , rr �i , ,! I � I � .1 ,I I , . I : I I 1. I . . � . A
� � 11 , : t, I , � I I %..�. . ; �, , . . . I � I �. , , I , � I
, ��, _ . � - . . I I I . ; I Ill I I . . , � ,,!, I I - ., I - Y 1. I t .. - .
. 1, �mi�� . � . 1. ,,, 11 t I ': . I I i . : I I lo, I � . .
I I - -,ill; , I I � .1 I � � '/ I ..
,
,
.1 I , -1 - I I . . , . . " ", ,I, , I - I I � i � , . , . - , . I - . . I . lei, ( I .1 I , . I j . , , . �,,, I I m . � I ; I :. I I I . I I I I I ;l, 14 . . It, I , I
I .
�
,
I I . .., . - � , � ': . � .� - � . . . . . . I . , . il, I 11 I I . I � I,- . 1"�.�11� . t .I �, . , _ " I , 1 � , , � I . ; !,l,r, .- . . I *1 . , 1, � 'I., � I I , , , ,,, ) '. . . I . I , I I
I . . I - � , , - , . .., _ ,, , , "I : . , - , . ,.*, � . I I 11 � . . . . 1 4 'it * " , '. , ,� , -- I . 1� 11 " �, I , . I , I I '. I I . I . , i . , . I , i . . I . . , . � . I .
� . , ,, fhl�,�� . 1"", � " � I ; I - , : - I I. _� . 7; , ,*� � - � - " ': , 1 , I I I I . . . � . ! : , , I I I I � I I
I . I I ,, I . � ��i, t 1. � .� I �� - .. : , 1�1 . ,.� " I * " I - , I , _ ,I'� I i , , I .
'I . r . ; ,; � 1:ii.1* , Ii. I � I _01'wmp� I , . :, . � . I , . . . .
� I . , wo, " I I - I . 1. ;; , I I I . - , � I 1. I .
, , ft, , . r -j , I I 1. � . It �:, ". , � �_, , . ,,, , - t , - i.. . I . I , 11. ,� � . I I . . I
- I : , , . t, . ; , I I . I . I , , " : � I . � .., . I . ". _: , I I . . I _-.1, . , , . . I . I I . '. � - : - 'A�' - . . I .. . . ..
I . . ,� " �j : I I .
I . I �
. . � . I I I � I � . I I I , l", *1 I , I I . , I . . . I it . , -
. I I I 4, - i_ � __ 1.1_ - 11 . I � I . ;1 � � ,. �... . "t, . � t , t� Iv , ,� , i . �It ,,,,'� it 4 I., , " � I . � . . , I . I I t . � I . I . . . �
� I g , r I . : . � __ , � , , I ,, .. '. : - �iil , ". 1 �, �'." ,,;..� - ,'-', ,,�� , .I , . , ". � 1. I � - t . .- . i _', ", , _. , , ,1i'l 1� , At, -;I -, � 1;� -, k� I M i "r ;,. I , � ,
" " ! . � -1 -t , 1. , I - - , , , , - .. . , , " , , III li I . I I � . i �
I ; . : . ,. , , I :1 - I F , �1� "I .
,� ;!, � I . t . 4� , , -,�, ..A � .. ". ,�ii-,, ,,, �.: , , , , �,r7xjli*A�iit� � , ? " I, � ,�' ,��' ", i,t� - .". , . , � , �' I ,, � I �-, . .'O 11,l � 1�'
I 1i , - , , . I . I I I ,,, I I . , . , F, �, .1 , , � , I , � , - � . I I,
I . I ,
I . ; I . � . , . . , � p I " . , � I �, �t, 1, I r ; , , , I I . � , , .� I .. � , % . , .
I - , - - I " , � �',� , � e . , - I v . I . ,% . - ;. , i ,
I . I , , . ., . . I , � . ,,, I . � I I �' _ � , I " : I " ..�. : � . � ., I '. . , "; , , . . ,,, I I , , , �- , " � . . I I , I I I I, . -ii � . I , I ,,, . I I . �
I ! 11 I - t� �'l - I � . I . � , . . . . . � I I I I ei. I I it V, �. ,; .. I " I . �� I :1 I I I I I I I v _itit.� � I . � �, I . � " , ; !_ . � I . I ! . :
I . � , � ( . 'i , , I � + . . I i; i - t-m- - - � - - I . . . I � � � � I
� . � , I . I I I I I "I , 4 . I I I * . . . I .
I �
j " 'it, , � 11 . . 1". . 1, .�'.. I I . . . � . I . # , '. , � I . 1, � � , ,,'I , - I I , -,,� i? , . I t'� � � , It ., " t , I V , _�: �_ I, .1.1 - - � . . I � I . ; . 5 . . + . . � . � �k . , I . . � : I I
I I , . , - 1. .. . I - I . "I lim- - . , " �,,j, , ., to _oA_ � , . - . � ! ; �, I I . . . --- . . .: 1, . I , . . I ; I � , , .. I ., I - I I � . . .. I
� t I t : I , I . I I , " z - . " I �, . ; I '. I , il , . � �t ., I , ': , - I * '" , i , - - " l, , , ,,, i, � jo r- - I ; _. , : � ., I I ; � .. .. 4 , ". ., .4 '. � " -11. I " '. '. I _., I . . �� . , , . 1. I , I . .� . � ,
� ,I . I I it , - , t, ,� _� " - , , , IS, ,
� , �;. . . , I �1` _ . . ".. ., . - . 1, " I " - , , . " � , , , I I ,; � : ! . � - � I , , , � ; - �;, . � �, � . I 11 " , I , I ,, � ", � -" I , ��.' , 11 ,� �Io -14 - , . . 'q I , , - ,� " 1, . I I , �, , * - :
: � , i " , . I . . , "). I - , 11 I � * 11 - .; � , , :' �., ;� _4 !� ,, i '. " I � . . I 'i . . . ! "I , � I , . � I . ,v I ,
� i i J , f .", � 'I, �. - _t , I . " . , I . . V . I " . . . . k, � � i
�
I , I I . I � ., i.. � , I .. .. I .� . . ". " I . , I ;% , , * , I .11 i, .- I 1 4, �-_. . ., , Fl"': I . " I . - I , , . . I ., . ; , . , . � � 'i'A I :y, � � 'I I I
. .., �. . I , - I � I - t -It ", � -:7 , " ,t , ".; " , "N , 1, cl) � I I . !", . .. �4, .6 , ,,, , � ; i ? I I I - t 7 � I . .
. . I , , I .,. :, I � , i�. i: � I , t , ,,�, , ,,- . I . . , e . " I I , , , I I � I I , . I , ..- � � I i , � ", 11� I � I . . I � '. . . . , , 11 . .� I I I � - I . . I I - ! 11 I
I I : I . - .1 , I I " . . , � " , , .; � , � . '. � I 4 1 . , , . , � . I. - � , � I I I I ! . I I I .1 , I I i, e � � :-A - .1 . :1: .. . �. , ". . . , .1 i
� . � I " I ! I � ,-, � . I � I I � . , : .11 I 17 . ,,, � I �,� . . , 1 , -�,,� 4 "' 11 . : . 1, I I I I I . it!,-, '. � : , I , � to;;� 00�;!;� � ,;. ; , . �, '. -, '. , V. � ; , , I � �4, 1 _ . .. , ... . , � I .
, . i "t I I ''. . 'r " : - I - , 1, , I I ,�., I . , ` I .,V* . , 1. am I . I I . � , I �1 I . - " , ....; --oo"`-'"""- 7 - - - ;1 I " � t. , I . % 1. , I �', ) I 11 I .j .. 1. 1. � � � i , . . . ., I . 1 I I I : ,. I I
, , � , � . � I 1 - . , ", 1. , , , , I . , . . I " , , , , - i it'i""cl ( ,,, , - 1 , . ,
1% , , .". - . � . � . . I � i,�' 1 , � � . 1, � - .,�. l � . .000000" , 'T .11 v , �4 i, .(l ll I, �, 11. " . I -.:..---,.. 01 � , _ 1 .,5 *;.,-- . I.; . � `..; ,:. . . . 11 I , , . , 'i
� ot � I . I . . . - � I .- - � .111, . � .. I I i, I I � , � ;I I . il ,,-- . ,, . - .t I , . 1, , .11 I .1 .
... I . ,,, . , . I I , , ,�:['! ,,, ,,, I qt 'I , t I , it 1,Z � . 1 6� � � ,..___1__. . I : �1. I .�
,
"I i . '' : � i.:_ 1; I; � - �' , . . , I I I t'.. "", I r., t V, :, . , I I �, , ; i, "I I , I I . �.. . . p
� . I I , .I, - - " , , 4 �, � : t . . A!" It ,I,;), �� I 4 . I " I I I . , I ._
� ,,t,!, ,rt."" m I I . -
.
I . ,r " : . � , �, � I I I , I . I 0 I � � �, ;,. � , i _�_ommowww�111110�7 I ".." 'v I I , � , . _1"t �, - �, . I I' 1 ,---.7 1 ... I., � - " ' " . �
. � I,! 11� �. . � 'll I I I - I i � , : �e. ,:j; 11 I I , , l . i, " , f ; 1�
. : �, , d" . , ", .1 j : , , , ,4 , ,i ? , # I 4 , . ____ 1. . . . % . . ... .. . .1 -, - ,
I . � , , , . I -1 i - ... , I ":: I , , , , . i � ,
I I I . ., . � I � I . - , ----I, � I , . , 1
I � !. , I I . P'A , - '. , , I . I � '_ � , . i . ,�. - � I I I .- -, v , - -mmom I I . . 11. I I i �
'r, 1� I � I � , , j � I : I . i I .� ; I � I : ) i. I I 11 � , - '� : . *� I I :'I � 4 ', I't ; , -.--- .- ___.__1.-_ - -,---.-- . _ . I � �. , " x : _ , I I 1 I I I . I I - i � ; � . I I ,
, � - � I I 11 , I � I . i . . , I , -;' - " I k, � I . � . I , �, , 0 I - - ,, " , "; - 0 � I 1� : !t I � 11..:
. . � I �. - � .: I -.� . ', "I :, !. .. , . - � ,� I � � ; I
" -, I . r : I ." - , I" � I I , , , ," - , � � , , I . %' 1 i , . le "I I � � , , 1 --- . I . � i ; ., t " . " � ;
. 1. I I ,... - - ." 1, ,� '. ,-I-. -, ,� .,� i�,. . - , - . � � , . � � ,�j . . 1, I I . . I "I :IA,.. I I , � � .. . . I I I . I - . . ,
. . ,, 1� I I -_ I .
I v., � ,,�,, , ,� + .P , �, f,;j , ,, _4�, 1 1-1 i, I - . � I -_ _. -.-.----- ,"_.,__-____. ____ I I . . . . . I . , I , I . � I � ! I i
I -,- -1 , , - � - ----- .. _7 . I . I � . .i. I . � . I - ,� . � , I . , ,, I . I . , , , 11
� .. I A , 1 . ... 11' ;1;z=;0;*__,____ -1--" , -11 - ._�. , _ -.r ____ I . , " , . , , . - .. . , I . , , . � . , � ., I I I it I
. "';w 11, It', " � ,, �, . i - .i � -_ . .- � - _--ii _____,___._, � ; , . .
I I -1 1. ,� ., I . 1, - _ . , . I I I , - ; --- ----- , ___ __ ___ - - .1 I .
, .- I . , .. I , . I I i ': - " .. .. � : 1� "I � , ,! t ') . '-L ,
� f. I . I � I . � I I � I � . � , �� __r __-;� _.�_-- I . I., .
, . k � . : � I , I , , : " I :` .1 ;�;77 � i'�,��", - . 4 . � � - . .1 . e � __ ___'__ -A -. -�;=- -- ___
. I . .. . I "'! * : �1!1 . I . I I � : . ,� - .. I ; - I ,:. I . I � 1. .1 I , " - . I. �'. . I % " v] , I 11.�_ . . ! .1 ;.*"�� . - I !. _� I ,�. , : � , , . . . Iiw� , . L L-, I , � � . I , , � : I
- , 11 . , : 1. , I � , . . I , I I . . , . , . I , I . . ; i . . I : I . 'i : I - --Z,�rI.)-.____ _ _w___ I � . .
. � l - , , ! �� _ :. _____--- ____"_, . . I
,� I ; :; � '.. . � . . ,. . 1. � I 1� I ., � " . . w I . I ,. v.__.___--1 ---.
, I .. . :'t i. ti, �v I . ,1� l , : t , . . , , . I + I I � . I ", - � + � . I . I I-P � I I - � . .. 4 , I I , . . . J . , , " '' 1, wt��-__---- � . _ I 7 .11 � , .___� ;. " '. , . � . I i i
, � , � �, � _ I. - , . I I,� ;. , . '. ., I'll, 11 .1 ;,` I .1 , , , + , , , I I . . :1 - �;�__�__ =_ 1, , . . . ( o� - I �, L i . 11 . .�
: � �, � ; � ��, , ., . . , . I I , . I . I . I 1,I I . . I " � . __1,-d___ ,_L___4_�__ I __,_____. I, � - 11-1 ", - .. . . . I . I .1, � I . I -
. I � 1 1), -----A._ , : I I '.4 � . . - 1.
I , , , , � I , i, . � I c .- . .�
I
I I ": , I � I I , � � I . �, ... 1 I � " * ; . , , I � - - , - A�� -_ wo"Aimoow , I . , � A� � : 1, . . Iii � � .1 , . I 1. 1, , . � .. . .. . . I . . . I . 1 m I I .
� * . I . - . . �1 1" .� ""...".11.1.1-. -"- �', I .1 - � " , , , i ,,� � I i I Fj I . . ,*- * . I . � , ,
I . 11 I . � � I - I " .. i . � I . � . 1, ..t� 7 �. I , . _dap �, ", -, - . - -,-.- ! � 1 4: , ., , . '. , I I � : , 1, _I;Z1 '.� . I . . . 1. I ..
. I I . - . , _ 4. . i , .� �, . z I . I , � , I . .1 " I ij, , . �' , .1 S , I I . . . I . I . . � r : , �' � - ': , : I I I N , I , , ! . ; : ., �" - I
1. I I I ,. : I - I . - . " � _ , , , , 1 " , I A I; _ - . I . I . . y: . . .
. . " - I % �� I I , 1, * � _ I , � .1 1, . .1 I'' t I I. � I . . . . . . . I- . Q , ,
�. h I ;, " , i � , - . � I . - , . , � I - , I . : I I I I . . , :� �, I I .. I , . . , I --_� . . , 1 : . � .
;;; I , 4 �11'4- � t I IM _.;.'; I I --:: =-.�,�, , �.-r�- ; � , % " .1 �. Y , ,-AND,
I 11 I � , . .,. "... �!� � � - '- , - � I il 1: _� , , , . I : , � , .: i " ) .44.�;_ 1, I...= --- --..,:W, I ,�; I.. Ar � j � , 4 I ,
I , t '. f I . . � ,��. '' " , � I I., ". I I ; ., . o r I . � I .
I : .1 . '; 1�,,: 11 � - __.�� ', I I .
I I . 1 .,. - *�* , , I , , � -_ I itl_ . . . � . I �
_ - ..�. .. i ,41i' t V: . 4 ��_ , , . . I . �i 1. I -
I "I _11� � � - . . . .. 1�, i`�. -i,. ': .� . . u - % � � �, '. , � + I I . I I f" .,. I . I .1 . � , '. . . '', .:+ . + .� . ,� I
. I I , . . . - - ': " "', " - - _ '� . I k�',,,,,,.�Ic.�t t- ' ' ,,, . - I I .,
I . I I � " I ,r ; I , V ,. .'': I .I" , 1 4 . .''. � I 11 I . t, I . . : . . � �. � � .1 . 1. I .. ,� . .
. . I - 11. 'i .... .. , _ _ - : ' 1'� '' l�l 1, , � " �.., � I- 11 " I - 'I'll, , � I I 14 . .�O, - I il �;.I.Alj,�t ,1 r, ,I , �. r I , I ; I , . � I I- I
. . . � 11 - , � : - " _, , �0 .. � �, " . � I 11 . . � -;` , *67 .1 ,_ I ; . . � I � .1 L � .
* �' ` � . � .111_1. _ I . . , � f �x , , , I : 1, � �Ird , �;,in , , . I
,;; � " - , I - j- - 1�'. , . 1, . t �.t , ., l �: -�', " I. � . ", ,. '��- � , 1 " , t, � , , , Ili, -� � I .11 � , I , I L, � i. _ �_ i, '' . � : i I . I I . .. I : ., I . ; i ,�� � ,� I . . :
. . -, ,. , � -i- - . . , + 1. r , . � � I - - l, - L10; I . I . . � I I : I . . - . i
.
I ... - ", , -, . � , , I 11 I , .,. 11 I , , . . .. , , , , I f , . PAVEMENT I . . I � I .. .
I , . � 11t I . . I., . .
. , , * t - § 1,�, . tg� -1, - I.- I.- t 1. . . ., ,.�',ik%-., l� , �1� I m '" ,I,, . . . . ,
. , � . . l 1". � 11 I I- 4.fy ". 11, . I il . It I I � . .
,7, . � , , - I il"... .�,, ...,�,' � '97,11`1511 ;, " " , N 'Em"'"', I " "RAVE , N I . �, i - , ! . . + . '.
.1, : 1, , , 11. 1. . ., . �.�� mr , I It I .-
. . I . . : � I 1, . I , " azzw� ; ..." I., , *Pi " " ; , " _ --...--- I
, . I , ,l, _i : , . ". ,-1,,4 '.. %. 11� .1 ". .� . , ., *: �_-1;==z- - . I '. � EX. . I . I
, .. ��: "', I . ". . . 11, � . , - -_ .i,l . .c;_�L , � I n ,, 11 I I � , , �� , I : I ,. . i ,.,
� i 1* I , '� 1, � I . . :. � . . I , � I I I � I ;,� , �4 :. . I ''
i,i` .i -� .- -, I I . , ___�__.;�:-�� . _ (1� , .
I " - � . , , , _ -, ,
, - I �_ .
�.-* Ir
� I
. I I , I I I ,�r I �!� , " ;x -, , .
, , . i � I , I 1
4 . " ,, �,,l . I __ I 'i, I I 'ij � �T, : 2 � ,
,
� , , � .. , ,
I
. , ''.. , ", . ". 't ,��-, 7 K .!. I .
I I I , KGEi; OF, -ME .
I � ,, j ; , , , � , � , i , , ! , I ,
I . 1. - . . . I ,,, I . . I � I I .. . , I 11, li� tS.",� - INO:.CURB . I .�. , ' - , . i " I— .,.),,, ll '' . , , . � . i� . -1 . - I I., � . rl I I , . I I . ,: . , '. . . I I
�.. I I , ! " ". 1� I , . - I . I.. �, * *V�1, � *T, ,�'.'l . - I �. _;, . " � - � _... 11.1 I - , .": , � . . . ,� � I I ;
I I I . I . ;� -,,o,� , . � I a, 4 v .. . - I , I . , . I ��' I I , , .1 , 1_____- I" . . . . , I - .
I . � ,,- , , , - 4 I , : . I , , . w I . , I . �, I . .I.). It '' 1. .. - 4 ,t4�, � " - : - I, ,, , , 41 � + y - -I ", 4 ), 't -�' , " , I r . I I A 4 � , � I. I
. " . . I 1. I . I A .. It � 'o,:. I , t , I ; � . - I . � I � I , t , _. , 't 1, � .
I ;� I I I ,� I o I , " ii I " , . . Z: I.- ... . . .
I 0 � I., r . . �- . I , ". . * - �. - f -�;-_. k .1----z-�,: I . � . . . I
I I . , , I- I , , . .11 I . � , - � -�, _�_4_.`. � . , . I
I . 7 � . %� I . . � �� , :, . �. . . I ". ,1 I I-, . , : " 1, I 1, � .. " I " t �i � I � � .� _1_4.;� 1 . I '.. ,.,
� I . I I I �., ": ,�-- t , ; - - - , �;, . m " N ��: " , I " ! � I I I I 11 1: . I . . ... ,11 . - + , " � 'i" . ii, �.v__ - -Aki,io :1;;t, - ,, � i , . � " , ., '. I t, ... I, .. . I , , . ... � � � I � '. ,7t , I , 1.,ii_,�__�__ ___� , , .. , � I - I I I I I , . % I., ;
I i .it � I :. � I .�, % "I I I . . I,- . 1.t .. � ." . .. .1 , ; * : '. I "I I t � I ., .. "', . . , � . , � . 4 , - - IP I - I _� . , .1 . � I I . ; . , . I . �
�� � ... .1, ...", . � . � It. t . . 'i.. -, � , 'T". 'i I,itl.iv ,I, -, " " ',�-�--- - t, � �i . i .. ! I . ., �, I �� . . + 11 . I I I . I � I . . 'v
, � � .. 1I 1. � .1 11� .- " , . .� : .. � 11'__ I .. - 1.11.11. I - I I . , 1, . I - I ., .. .., I I , I ,, , L . I. i . _. I , . f � .1. I ;�.Zi _� . ,` , . . " . � *. . . . � I I � , . �
, I . � .! �;_g . _. �, ,. I . , I I I L I . . I I I . I .
� � � I $1, - . .., . , I I : �% .: - . I ,' :. " . - . , .. 1. : , ,I . , , , �A . . ., . . t 1. 4 . ' 1. I .� I . . � I
1, I , . . . .4'1. i " � � � . I �., A, .. .. � , I �,�.��r, _Z;.Ii!�_..a�� , � __�. , I + ' I '�' 1 3+00. 1 1 i, 3+31-24 . I '. ,. ,� t 1, .1 I
I
, I , ! ";:"", , " "', it t"I"I"t-', , - I . .1 . �, I 'a -, '� ..!, " .. � I _, :.,..i I - .t� " . ,4? �, I 1: ,
I I . I I . I I'll . + - 11. I .. . � �: 1. .. , . I � .. ; . . . .
. . i . � ."', I I , I " I , I . '. I I '. I . 1 .
. ,I ..., 11 I I I . . . _� , I I I . . � . - _:;___zI t - I -, � - �-�'. -�i__,-, " ., - iii, t -, , 1,; .. , .1 2' 56 " . . . TYPE'11'CB � ... I ;' �, � .
. 11: L '; . . . , � . .L' I I . J I . , I �' " I _ �+__-, . . - - ' ' I � , ' " ". -1 I . . . . .- - . � I..,. : ., I
I . .. I . . . . k I .: . ..( . : , � . . . .- - it, - . - __ � . , .. , '' I " I ' _* "" "'.. - ' `__ # I , , � I I I I . .. I I I . I _,� 1 - ,, �. I I .
: " : I . . i ? I -- I . , . , . ,
. i.11, , . I . - . � . . , ' ' - " '. :---I--- - , I �' -.1, - , v - - , , 1 . . I . �. .1. . . . 1,
� 11 !1. .. . I I .. . . . . I . � " I � � I . - -,I- _,�., , -��_,�,_:_*__::._:.' I" I "' "'J" � .1+50 �... � , �- .2+0Q � ,., - �,, ;, .. I , . .. I" � ' - - RIM. = 420.3±,. ' � , � '. . I
I �� -.1 . .1 � , � � I � � , ' I, - * ,-- . t.. - ., , � . . . i 11, . - ". I ,;' , � ' . . ., .1 . � I I . . , m . - - �.� .- . . I _1_� I t. I I I.. I . 1. . i ", , , * , , , , '.1 I . %+ . I
I . " I �' , _�, +_77_._- ---7 , ! i, . I I . -i't 00 )i , , 7 i I . . . . I 1 4:1 - -1 , I I - I I ,�. I . I I . I., . � � . , . ) I i
. . � , I .t ,. � I ., . . �, . . _ I'll' � . � I . k 0+50 ,. I ,.,, I . _� .1 ., , � I � i . � f. I � . I , . � I . I
I � 1� I . � 11 . 4 I I _f'!.1n, l -_ I . I' i '?. � 1, I . .. . , , i , I + � I � t i ". , . , I 1, I . . . . . - I . . .11 � I
I I � � I . 11 � - ... . :r� 4,l, � i I . I � � . . ii� I � ,111 - , I I li',�!: 1. . I � I I", � I I . I 1. . I . I , I I I:' - : - ! * 41 1
11 I I I I ; .. � . I , I = , I . � I - I � � , I
. I � . I I I I . I ". ,� . . � I �� t ., .
� I;, , It ,,� .!_ �Iv�l I , ' .1 , I . .1 I I I .1 .. � ", it I . " t 1,; , . , I I ,� . I I . . .
I . . I I I I . � � �� I " � 1,ll . c- - f-In ---.ft,..=. �. . I I . I
I " � I I - I I I I I . I 1. " . ,, , I I __t�'. . " + . �
, I , I I . I's i I �1- I ,� 4, 41-.,.�% I -,� -7;*.'% � ; - �-�� '', ., . I I .. 1�__ !, �: 1. , . ,.. I . I � . ,�� .1,11 I , .� '.. -e . . ". lt � ''� ....... . ,' f" i, � � , J, , "".1 ", ,,, � I I . . - I - � - -_ , � - . . I . .� 1, . �
' I � 1, I I t. , I � . .
. I � 1� 1 , , .1 11 I - ' - I " � +" '.'; ? I .I I I, I. I., � '' " . I .1 j I '. .. � , , , � . " , , E.'OP',"PAVEMENT ' , o' �-� ", ,,,,,� 't, -;� " I - . � 1, I . . ... . I � . I I "
I ; , , PIMM - .. rr - �... :04 001 EDG , IE 4 t I
I . �, WAS, . , _ . . , . .. � 0 .
Ifterm, � ,4' -1 � . . - I - . 1. . � . ij, . , _ . � . �l. � � . - - . . I . .
II .1 . . t, I � I .- .v . I., I I 'i, V .- 11 �;, . I I ,, -, - ".. I ... ''. l, Ist o' !tr * 11 . � . , I 11. ,... . I I �. I I I _w , , � : I , . � I I I . 11 1. I � I I . . - I . . . . 1.7 + . ... : .. .
, .% - , . . �-. � ,%,it'-- , - "'., ), , j , f t � .'. -,. .: � , I 17! -1 I � !i.M. . :, I " I
.�_ . .; " ".1% .*." 1, - ". . 1, � l '. . ,,;�'. . ,., � - r.1.' loll 11 "p ,w - , -.1. i . 1. ". ==c0i=www_w .`*"""""""` I . . I � .1 I . I �
� 11 I "'.- . . - .." � I . .. .., I -_ I I . .1 % : . � - ;
I . I j . 11 I . I., " ..j_4 " I I . � I I I. . ., . I 11.1.1 . .r I . . ,
I I . 1� . � . .1 . � - . �' .�. . ,i : _.ii .1111. * - . I , : , I I . . ;
=1 - ., - , ,,,, i?, , �, , i : - I . I—- .. - , I �1 �
. I .. I ,
. mymg CONMA I - . t I I., 1''. .11, ,,, " 4 j. " i ,,, " , ,
. � '. I l. 1. I I . . I I .. I . � � ,- .... ,,, - 1, , " I . , . ., .. It � I t - 11 " - I I . .. t
I, I _� .. ,, .1 . I .1 . ,. ... I . .1 . '44 . _I,,.!" � I ___`*�"` I . . I . - �, I _ - I I 1 . . . . 1! . I . � . I I . . . ,r 1� i
I ,�:;, -,, - � .e r�, �! I , .I' ; " .7. -!- "I , '. . _ . , . -,!.,� I I " , . I I If , .
; I , , " I I . I I I I o . I . .\ � .
- I
.1 I I � I "m - . -1. I . �, . , I ; ." . , I I . . " . 4 - - , .. , , � . - - ,� �, :.'� �, �� . .$ ... 7 ....... -7- - � ' - ', , , , . P1 -1 I I . � , , _ I. I " I I , , , I � � ltii� ., - .t- , , , . � . , . , . � � I .
SHALL BE " I 1� :_., . �. I _�� 1. 1; I, I I I .1.p11d1::r , 1� � , , - --- - I 1 1. I ,It, " . - I . .1 . .
I I , I � �. I I I �, I 11�' i,ij , f'......'.4 I - - I I - �( I 1111 . .11 .il� � "I �. ,"M - , I . I .. I , 1. I � I
� � " I . 1wer"Itioull....'. . . . I I _, . I . . . 17:z I . I I-
I I p , I . I � . . " .. k,t - , " , .'r.?, 1, All, ,; - , ". 1" , " . ! , , ..!', , '. . - ", � -, '' , � ,,7 � ,I .. . I . , 'I I I . t , 1. __ . � . . I q I A�� , .��. I . "I I !11 . � JI � .1 : �., I .., . I , .1 2 I SD .. I . .. \ .. . I � ", I �', ", - , � : . I : . I i
,
I I , I I " . 'I , l I - .. I -1 ... 11 . I - I ., . . - , I . :�e � , 11 I � " . , . !.. . 1111� I .1 . . � . _4 ., � - .. . , _ -; ,� ...r. ; , " - .. :
. I ). , . . I . I I . I 11"i* - ii4 , m".-..p"ro-7o______7 -I- I . I 14 - m , f I , �� , �. : - 1, -� �-" - n, . N' - 11 m .1 - . . , � i�vi , % - . . , 7ma� 1 : I - I I. 1. " ,,� �
� . I . . - I . . I . . .. � tr - . .1 ,�, , .4 1, - , � , , . 4 , , 1 , ; . . , : :1 . .,,�, . . . . I I , I , , . � . � , . I . I . . _ I . . I %.�
"I � . .� . V... -1 t � . , - . ; . IT , , , , tw I i, , , , I - . .� - � , � I I , - 1A I . I I . .. � . , . * � I i" I . ,
I uTLnmB . �� I 11 I ''. _ � .1 1. . 1 ,,� , .11L ,; _ L, L, 1, - -, : � I � 11, 11 1, ,f �1 "I 1. _- ,.' ,,, . ,SD A �,Wm i 14 ' Il. i V.1 I'V it , I .�< I., -1 11 ; I. � I 11 . I . ': ,- I . I .. ""...,
, 11 I . . � � I I . _14 "..; I , � �� - -_ ... - I � il * . .. . .... .. I., . . . .1
I I ,;. . � . .. , r . . .. . .'. i: 1, , .. . I I � . " . I I . 1, i t. : ,;�il�,"�-!�! . I .. - - _-�! - I - --- . . . � .. I .1 ... I . . . ..,.. ..: �. . !
., . " ,I/ �, ..o. I � m ;�3 11 tit) I , . ) . - I
"I". . I - I - _ ,,,�;� � , I - '' , I rl�
. . I � - ::: , , " . 1. . I.. . . . I. . ., . 1., _r`1__ I I . * ... lar,,- � I
I � I , . � I I I . L I I I i ; , , - 1, I . i i . - ' # ,, - , , , - , , , "', - (=) � , !_ . . L . \ - __T . . I ., . i I . , � . . I . . I � I � . I ,l . .
I 4 . I . I I . I , , , - I . . , , I . , . I I .. , . � . . -
I , , ? I I I . � .1 . � I . . :� 11 1, . . . I I . I "-*_1i9*"*`I I � ". I . . � W, , " I - . , ,,, . . ; . 6 1 . $" , " �, ., ', ,�,� '! I I . I ?< I . '. , , I _ . , . I �,
,
- . ,� ': I I L" . , �- . - I m , . I- . ... X ---- 11 , , ". ; .. , : 1, , i . , � . . . � "
. I . � , . I am - . . _L� , , ", , , I* , , :""I" , I
� , ,� . � I I . , I I I + I ., .� , i%,, ..��, ,,, .......; , 1. - . , . ,� .- . . . I . ,
,
� .. ". .. I- - _1 ., �� � . I � I , I . _1, I I r , ; , ; N E . , ":,. . . I .. I .. . I . I (7) �
- - - .7. .1 + . ... , ". , - I , 1'. _. - �. .1 . , , . t , � * , I . I I I 11 I 1. I ..
I . . � I I . � . , .. 1. . ; - -2"" 1 ,. -Fwp,�. T - " L, I " , �,, , I I , . . I - L.--;. �_ -� vi-,� -,�*4 __1__"`"o I - - � - 1 . q , ,I I I" ". "' I -, k t; (A _ I . . . .�
. . I I I , .. . . I I - �. I - , It"' - " . "I'l I ,, - - # . . . , I* . ;a - 1,'�' Z� 30, - m ,` . . I I I I
� I - I , , �- - t I.. j4 $l I . I - - , - . � - I �, ! . t ; , ; +1 � 11 !
1. ;, ., � . . . . I -7 � I I I � : " �1 _., '. .. �_ , - . - � - "I , . 1, i :11'i - � , - I tl 't ,# 0 , � " ;a I � � , , � I I , I �
I 1� . , , . � . ; , � . ..", � - - 'j-, � I .1, . , . ,t' . I I l- ; 1. . .. �
I � i, � I � . � .. , I . ., . 11, I . - . . . , :, . I , -1. � ...A. ,,,,iiol,i -----*.---" - . - � I .. .. .1 .. .. ' '. :1 - : .; - 11 � � - ' " L . . . . :�F � e . i . I I I .
: : 1" it .. . , T I . . '. . . � I I . ., � , � , ; ; I- p , , ,j . - I I I I
- , , W, i, . it . 11 li, � ! , . , � . ,. � , k I � 4 C.'., . ;
I �� " I � . I . I . I , 1, I . ., I , ! ,1�6 - , I � I .. - 11::; . I - . � . � . .. ;..., . .� . I I � , , , , 'j! Ill 'to .�d I . � I I , I . I :
I . . . . I I . , . I . � I I ,<-I?A . I I t Lj� - ",'�. ',' I I , , . , . . . I .
� .11 � . . . . . - '. . � i - I . . . I .4 -, 1. � . ! .. ..1. . � ,; i 11
I � . � � . . Im � ; I I - 1
4 1 ; I I - - I - , � . I _. .. ��" �'::, ,� - . �� �� . " , I �`; 4 :,�Ij ,_; I . � m , I � , A P ZI z 1 41 1 l 40 ..
. I k, *1 . . . I . ; . I ".. I—- � � ". I . * _ I... I .. .. _T iz , . . .1 . i
� I . - I I`— 11 I ", " , , � . - � . " . I i . -1. I * . . . . � ; I . I
I I I _ I . I . , � - 1. 4, I . .- ... . I I I -, . .
*1 1, I " I I . I ,�,! . . . , I 1. 1, . � . I � . " , . . � . 11 I toc, . .. 1. - . . . . . I _ .. - I �
. I I I F, , 11 �!' 1. 'r . I I -1. . . , " . - � I . ., . �. , , ,,,�., , I I . , . , I 'i k , ; ( �,, -z cl I' I I I I 1, I � '. I I
. I � .��: .- I , , , I k , � � � I I _. I . I I ". I . .. . I I � _; I ..,,�, �, I .1 . i4i e . I I �1> . *1 r, . . . . , . I . � ., . I . + . .. . . I
, , I I , . . I . . I I - �_. I., ,.,.I " , l'o" . I , I � 4 I I �> 0 .1 .... . . I
. .1 I., I , a 1 .. �,, I t -, 1, I I-, �A . .L: , 0 rq "')
I t AU11 N0,11 'M& 002A.9 . � . I ...'. ..,!.. I :'� . I 11 ',w I , . , _� : I.: I . _ 11.1 F11 I I
� I -7 *� QE�, . JOR, .t ". . ... , I 1+..�'.111 � � " �," $,__,-1 � . 'i . , 11 i , � I �.' i� I � � '11�114 �fl � I . .
I I . I I . r. 1. . I I , �,- , ", � � � � 1.! : '. . I - _< jj _P� : "I'' . 11 . .
. I � . . t .41�i I L. li'v.. , "A , � . I 1. 1z 11.< *, 0 .1 � I . . . . I . . . j . .. .1 � :1
? I 11 I— I I �, . I I I '. I 915TING CB ' .� ..,"I I I 1: I .� . '.. . . ..1. . .1 ,l I . I 1� L I— ..... I . i .. '. * I
,
�, . ��., - "; � I I , .1 � � . '_ I :��,,� �4 .4 iz .. � ' 4 ,,, ,, ', p I , ?A .z I . � .
I I I '
- . I I . Ill! ; I r ",I:, ,.: 11 . .. I I . , I -. I . 1�.. I , , . . ' r, .. t . � � . . I . 1.
*.
! . . I � I � .1.. .. . I I � il. I . . ., I I 11 't -1,11-11:1 . . TYPE Il- CB 1! ,< � , . . � � I .
., I .. . . I :. :v . . .. .1 I I -.4 , ,, . I . I RIM,,= 'M . , . - .p. - 0 I I -,, � , I .
'', . � . . � : � " .; , � '', , - I I , � I, . j. � : . I ,. �; I I , r. I . � . I . . I I I . � �
lr . . . I . - . I - - ..'' , I .1 . I .. - 1. I I I I . �,, I .1 . I ..- I
� I I I . . . . � . - 7 1 i" 'T , I 1 0 0 I - 1 . � . 1; . 11 l, - . � . . . 11. '. I
I , : ''
I I I I I I . � . '. � 1 , . � : I " I. . I .. t . I '... . � , , ! I I . I I ; .
. . . � . . � , ; . ''I" � I 1. I . . I � . I I . . . . I . I . � . .
. I . I . � '. . 1. t � i, '' ! I - 0150 . . ; ., . . - . .1 I
YOR ELEVATI , . " ', , , , " !; 1 , � it , , , , , , . . - 't.A I.- . I
i -%�,pj U(ISTING, ., ' I � � :, ", ,� - , , I � ;�, ;� 'Zj. cl :rj r , . . '. ii .1 � , � .;".r, ' . .J��
- '
I - ,Atj ` , , , , , , I "' 1. I I � .. I 1 7 � I I . I
ON -1 -40- `�, -, � ,,, I . f 1. ;-.rj I.) �,,. '�, .rj .
, _�
1HE, LOCATION ,OF ,(41,7.5±) � I - - I , I , . r .
,
:f 'N '�� ,�4 1�t , ...
ITHE'CONTRACTOR -. IS,� SPECIFICALLY, CAU11ONED THAT, - I - 1. � . �� P : � . ,� � . . ATCH, EXISTING.,: GRADE- - ' ' I 11, I I 1 � 4 -�p - l - I
� . I . I ... , ., .� - .1 I . I I s 11 il � - RIM!, x 407.93 . L ., �-,, ,0 I
. .
.
. I .. , I I . � . PL A _ ---NAL EW sck.E i ,
I I I I I . . I �. � _. . ! i�� i - .p. - IE --w"4 -. . 3 I �; ; 1, I I � !" , I, , � . . .'I , � I I I � .. - I . . I . . � " , I .. I � I I . . I
, ,
I I I , 0:. I : � , i I . ` il lil. �I. . , , I I ;* . . . , i�; �: . .* � 7 . I :I
I . I � . . . . I .
. � � , � , , it I ,_ I . ,,,- _. � . I I %.'o 'r � q t, t ".. + � � . . : I I I . I
'PLAN I ,�`l - �" I 1�. � I , , � I I I ... ., "� - ..'I ,: , ' . I
. I UTILITIES AS .-SHOWN ON -THESE . I : , . :,1, , "i., .: :.,z ! - .+ 41, I : I - . I
. . S � IS BASED' . I I I : . . I .. .. , . . -, �, - I . I "
. � � , 1. � I . , I I . '... I ,, �, ,!, % , + 1. � � .. � . . - 1. c�:: ,-;. - _. -
'A * 1� - ,. ". , � , I , I I , .. * 11. 'i '1k ". I .1 . I I , . . I I ,
I . I . I I I I I . 4� t - 1: li h, -1 - r I .1 + 1� , ,iJE ' -, 08.4 .- , , I...
� . !.'' � . , _ '�, '' . . � ;'ti` " .. ii': - , ' , I � i. " . . i . . I . I I . I I 11
I - . I � ,7, 1� '' . I i, :r "' I . ... . . .. ".
, � . " - 4 1 . . I I , , I
I I j I i - - + I I - 4 I , i �l . . 1 4 ,� I I 1. ! . I
� I I .1 I . I I . . I I 11. �� I I .. - I I , , I r f . I I 41 . I . I I � � .. : � " I .. , I jr.11 � , 'I 1� I . I It 'L . I . t I . I I I " ... . . I . , [; :�, . . . . I I I �
_ I I , I . .1 I . .- : - y 1 "i W , . .1 . " I � . I
-RECORDS OF,� THE � . I - . I 1, .. - � m - � I > el. . I . L , I , I . , I I I , - ; I I . .
I ION� .' VARIOUS UTILITY COMPANIES � I . � , I ,.: J:�� ,, . I I I 1 I
I :-, ,,,, I . . � "' . . . t,; ,. , '. . I I
. I . . , � ' r . ; . . . . . 11 . . 11 I � . . . .
I
� '' ' I " � t. ; � I � .11 ,.,." I- I, �', 9 . I - .1 � . I . . . ... � P_ i!. " , 11 .,. I - 11 I I .11, ; I :�, I -. - _,� .tt,., : " t .. . ., �, '.,. I . :1 I ! I 1. " t . 1, , �,, ': � �, . I I , I . 11 : I � -
. - � . - I . 11 I . !_ . 1 �L I
I I I � . . I : . .. " . I I I - � .
'. - .0-BUILT INFORMATION I . � .., , I "., �'; , '11, "; / .,;. j. , . . ., . . .1. t1t . . 11.1 . a . ;,,I 1, k ", . .. I..: .i .; .� ;i... � .. I . .. I, I � ll% .. I .. . . I 4 . .,I % - I . 1. I I �
ABLE I I . THE. ; . - ", '' i'� � . .1 � - '..."'r, . . I . . I ; . . I . I . I I .1 � . ....., . I : . . . . . �
, AND , AVAIL. - - . I I % � ., I , I q . . 11, t -. , I � i i - I >_ (n I . I 1. ! '. . � .
I I 11 . . t , . . . I � . .. . - 1. , :!4 � , _,'.%�_ ,;� - , � � I .. � . . I I . �. . . 1. I. � . � � I
� , I . i
� . .� I I . ", .
' . � I . I", . �. 1, - . ,�, , i�,.,,; , , �., t, I . ,!. . � , , RA, 0,." . , LI . - :nt LO R I � . ..
. I . MATION,IS I 'T � TO BE'�;RELIED" ON AS* 7 I , -- . I . I , I . I I I . I . z : I i ( d . �, � ,�. 1� b `;' " ; i , I I , . � c); - n I C:) Q , I
I I .. . . + . . . ? I I l � I .." , . . � ! -r�,l. I e
. . I . I . I . I . � � I I I - . I I . I .. I . , � I . , I ,i ,),,� , � . ,,,, I . I . . . . .- I . I �
* , * � . I . t . ',
� I
. � .r - I �,�:_ . I . . I f i , +�, t , , . I . ; I . . .. an. I= � . cr_ 6 . I I .. ! , � �
I . ! I . . , I a _�, 1� I . . 1 S 1 I . ... - .
ANNR � . I . .. . r. , ". v , ... .. : . . I . . : " I . . , �, ..''. � ,� � 93 1
iq , . , - , . 9
, ;1 , I . -1 , �'� I ; � . �
- - '. ,#'t" 9 I .. I I
I : 1. .. �.. I . �'. .,; 1:,.. '' , p , it I . I I ",;,I .1 � . . . i .4i . '' I . , . . . = I 11 .� I . it. �
. . I . ' � T � . , � � . . . _., . . I I 1'. I . t t ill ": , " . I
, TEAHE,CONTRACTOR ' I . . 1 - ''. , ". I - % .1 4;t 1 1 � � , : 4 . � I I i + ... 11,4", i I . � ,� . 1. * _" . . . . .1 11 . 11
I EXACTOR 4 _ I . � - 1, �' I � , 1-. is �,, 110'' . U_v 0'' I I' L_ I. I I - w i . .. . ,
I . I � . .1 . , . I �� . � , . -, I . it I I . � T i . -.,:� , I., 4 ;.t .. �'. I �f. I :
� � . .+ . : : . .6�. m - I Ot UJ . I - . I . . . . I . . I I 11 I r
� � i . t . I I . ; * , * , + : I , . ; ', � 'i . , I . . , . .
. I I ., I . . : . . I 1. ".., - . � 1 I .11, j , 91 .. . = I � , I . I . . � I I . I � . ...
, 1 LL THE, An, P . : . � . . I I .. � , I , L. I,+ . . cr- it. in 1(v�- , , - � . ... , � I I . I.. , I . 1 .. I m (n I w c� U) - I . . I . 05" . I . . .. I
. . . �. ., __ _ , ., .- . �. �.,,._,� j _ . I , , 1. . I I "'t -., ..,. 11, I , U4 �- . . 6 w . .. I . . . . " . .1 .
1. I % - ,.I ", C4 , "WI � . _ _ I I I .�. . I r. .., I � U4 I— . CN M I . �, 1. I
.
: t'. .. .'A'4 -, , !; ,_ 11: . I E. � � i. � I I
. .. . '. I � i, I . . I .�.j I I I I� . . , I . + "
I : 1. I . .. . I ; " I I '_ . . I t' L,W, U�. ; ot . "It u- :5 . " . "" I � � - . .. . . I : I . I
l . � ; 'it , Uij U_ = �'�Ll ';j: " ,. ' :1, . . , .. I ., �, . :D - r ..... , I f4r) - . I I I
� I
I . :MU$�%'CA .0 ROPRIATE - UTILITY'COMPANY. AT I i I + r ' . , .111, � ." . ;. . I . I . _1 " .: " / V'. 'I . . , , I - ��'. + .; , , �' , C:) .
� .. I It" 1. , 11 1 .7 .1 11 I �. . I I I .. I � .. , . . 11. .,. , + � �l I - - - emo ,A, I, ); .1 ��(-,� . � , �W I
BEFORE, -ANY -EXCAVATION - TO -, - . I , I f I - ,.., . I I _�_ 1, + : : :, , . iii., .
.-, 1! %, . , , I - :-� - I !, ., . t r4j ltk_o� , : -, I � . ;0. ., ' � 04 __j
. . I . 11 I n
. LEAST 48 HOURS, 7 1 1, .. . , ll. ". I 1. _. .. - ! - . : . 01, � I I I '. ,".. . . I I I I I - 8 ic I
?, I 41 , � �,:�,4"j It., � 11 ... 1, f. , " , 4m � . -� � I
11 I � . it I . I I , , I, 'I I i S rl_ Ln , . I . C � I e, �,,.' . ., I . . , ".;. . I . M LO _ LO . V) :0 . . . . . I � I .�
, 1. i, I I . I .. . Ln, C;x ! , ,
-, , . � . I I . I ' ' _1 , , i , . . pef . ,.. ., +. c 'a O... m . �D , , : I . I . . t , . - V-- CO I M LO Ln ,in Ct.J4 I' �' 11 .
. L, "- � 0� . , �.� . I . � 1 (6 . 711 I �_ I U-i 1. . .1 1. I I . . i " � fle) g= P- r-- . . . I I
; I., '414QUEST EXACT FIELD LOCOON OF LUTJLIJES$�% IT If . . I I I I 1 'i ' '7� y ! I �� ,,' . I I I , I I- t�t -, i, . I : I t ": , . - I , v C; 1.
� I w . - - I 't - -, . �
.
I I � � . . � - ; , # I I I. I I �w . C4 co !� , * . , >;- " , 91'*' 1. I - 1�� � � . v, , .1, , . : . .. . w - 8 - I � � - I � . 11 � I
, , . I � � ; . � , - - - - - _ I I ; ': % , � , -;- :1 . . � I ��, � I . I , . I �_ Ln '. I + LAA . - , .
. , . . � , I . . .+ : k I . , - , . � � . , . .-Z I I �
,� . � I "I .'' I . � � . I . I I I I I I I .�. , (m li? :;: I
. i , " 1. � . ., __ I . I I I I I 1�11 ml - - Ln 11 - . I . + + -4- = . " 1, , I
� . I . j. , , � 1� . '. . , CD Z I i � "� . : I I .1 ..
I � .,,S o I I : . I . I � . '. �, . I + . CD . r*_,_`1 i ': : � I. , , . . 11 C4 1 'It I< in i I : I I I
,� 1. ALL BE SIBILITY .OF THE CONTRACTOR ; : , I I I F I ; . t � .. I I - , I p w 'r 6 . I . I . . � 1. .. . � I
- I I .. 1, I I . 05" u,::,�:6, � . , . .. I ? ., I . I 11 0� . " 0 n C) w#1 I . L . I
I '!.�*: ,'I-, I I . . .1. . I - 11 i
. . I . 1, I � THE RE$PON � I I- I " I . 1. . - I I I i:1., ,-,:, 1� . ,;z it - - . I , I :1, - 1. . I . 0 o< M L L � _Ile ps V) U., . I ::W- 11 . I
. I : I . "ALL; ExiSTING. U LITIES MICH .'CONFUCT . . I . � l I - : , ! . . 4 , � . I I I I ; 1, I , . I . L I - � . � . ,A - I " it + ^
" k ELOCATE-, i . . I ,)� _; I T : I - -. . �- . I - , , . , I - . I . I , . I
'I I TO :',;� , .11 I I .1 . � I 11 I I ., I# . ::i '' " 1! I . . I I. - � ., -..,.,. I . I I : .
11 I . . , i . , ,,+, . I " i . Q,2' . � . , . . . ,w , � . I < < M , . .. ! I I . . . . . . .
11 1, I .1 - . I . . 1 I, ,; :� j� '. i �;- I . . , - I . f I � : .1 + 4 11� I : - , , _1 .I . , I . I 1 �, .1 I . . . , . .1.
'. � ,'� . .: . , 1. I . . � � . i . ., 1% ,.( ,,, . �� � I ; I . 'e, �, , .- . �_ w . I .,
.
. , .1 .1 , . , " t - , , I, . .. ! �- �, �I,r 1) � ,,, . ". i , I . 11 , , , � . .. I.' 1, -, .. . ,. . � - wj (n 0 I .
I " " ! 1'� 1. , , , .1 1 7) C=L M:E -aiUJ
, . - . , ,
. �. . I 1-1 1. � !,� �l..'� . . , ;,;, - '-p.." �,,l . .
; - .. ; �' , , .�
� I 'WITH THE PROPOSED IMPROVEMENTS,SHOWN ON, I I , . � ,, , 'r * , i ?a w - _. . . 1, , "t I . . I . I I � I I I �1' i ,: "! . . .
� ,
; I � . � . . . . , � I 1+ j : _ . I ''I �
t I � t '�'It ' "' I � .
A ,�.,! ., I . � . " . , I -,� - + . I I : , I I
, - . . '. 't,,,,..� i, '' , . �-A.0if',s_"'( , , 4.r - . . .. � ..
. 4' 4 . � I .1 I le , v ��,.,� .� : I ,� , i ,* , ,� I . I . , . . � I c . . i . - 11 .
I . I � , ; . I r � . _ �, I � . . i i �,� " 1 . � I , .. , .. ... . I .� , p , . o' t ;: w I ,* itt , I I ' � , . I � . I ,
. � . . � .1 - I I . . I . I I . . 1, �, . . . , . ?, . � I . ! , " �
' E I . I li� . . � I , 4 . _ " .1 I I . .. . !, I . , �' . 11' , .. - ,� � L . ' .. ;..., 1, ., � .
- I ' SE , PLAN ., - -� , .- I � �, I 'I. . 11%, 'Ik�� . . - , , 1. '1 ... _.. -1.1, � 1 ... I . . _ . .1 I 'Ll . V � , , . I + - i I -
� . . , .. . . 4 .1. � I - I . I k � . ., .
� , I I.TH $ 1 1 , I . : . I ; I �!, , . ." . IN I - :, ..' ) ,'I I 1. . ;.1 ,- - . � ; . . 1, " . I I I : . x . .1 . . I � I �. �
I " 4' � 11 I 1 '. � �. , I .... I . . � - ,� . I . . �. �'. , �! ( , � - " ... . � li . - .. I . v;` - . , I . . -,��, r �,"� , I' - " ..., - I ".., , ll - . �". I ;1� .. . I
., 11 7 I . I 1. I , I , . - , . . I it � I I , '. - i it I I ! I . I . . .. . I .
- i I . ;,. � . I . � . I I .. r. + I ,� �_ �i. I I I 11 , . I :, 1, . :i . � . ,�;,! � .� i 11 ,� I % "; ! , " '. I I . I I .:. � . . .." I . I 1, I .j - . . � � . . I . � I I
. ,I . , * I . "-"-.:, , . ;,. ,�it, I , .
I I � , I I . I � . I . I . 1, -_ � . �, . �, I . . .. � I I .1. , - . I
I I � - , , . : , I I I I I � I � I � I . ` I . � i. '), � , , t : ,,�( 7 , .;: - - - -, '' , . " , . !.�,! j, , .,,. .1 . .. ., .1 :; , . .1 . I � I I I . I " , i I' I t 4 .1 . � *!. ,iL I . , , , " I I . . ., I . ,; "
I . : I + t I - I . � :. � 4 , I ) : .1 1. � . 1 I I . , "I � 11 * .. �,- - .., 4 1 :, . , + I / I � � , I . . I I V, . :, . ., i I I I .f 1: . . I;., ; . � I ! . . I.
.1 � 1 : � I I .. . . I_ I . . . " . .. � , . 1. L' 1,
I . I . I I . k A . I I
L � ., 11 11 11 � - . . . I I I . '. � +A 1, ", I I , I I - , , . - I � . .,e " � I , . I : . I _ I I . , . P�l : I, - , *1� * . 'y f � , - . .., . . . I I . I .� . . . I I
I , I � . . , . I . � " �l '. i 'i I I �l _. -�! ': ., � � , f , . , � , I , . 1. I I . . I � I 4 � � , I . I � � ."., . : .- .. - - . _ I . � I I .
. . . I . . , � L -, I. .:
, , ,,, I � -1 1i t, - � I I .!:, . I I " � .. .: :. ..li '. '.. . I , , '! . . 1. I � : . I '. .1 '. , � I I . I I . I I , I I I � . �
. . I * I " It I _ .: I , � , � _� .: t . I . . , . 1. , � I : . f I ) I I �
, . l .f. � . I I . I , i . � I . . ,�r . . . . I I - I I . I i� I � i . . I I . . . , I
. I I I - . I I . I . . I '. I . �, , , I I . , . . , � p 'i � . . i . �. - . I - � . ; I I .: -
� I I � ,� " I . I I I , , . I . .1 . . I r. ., , . v I I I � i - I I 1-- , - 1 I t . . I - � - . '. .
. " : 'r " . " . I . � It .1 ], 1 4,_*. ;. 420 1 1 1 . j 4 11 . � � �
� . I � _ . . . � . - . . . I I '' t, I . , I I .
. . I � . I I 1. .1 .� 1. . . . 1. 11 %. _'o...........1, " ---.---- I I I f �
I
I I o �, ,� I � 1 I � I I I . I ) I 11r, :1 1 1. , . . I .1 - . . , I I . 11 I I . I I I I I . .1 . . � .11 'I' 14" 11 _t. It, � .:,' 4 I t. I -1, - I �� . . ! I . I , I * , � I I I - i, . . .
. . . I . � I I- , f! . , 1, , � ,c,� I I I . . I 1 I ':' , I . i � . I I I .. I I I . too. -_ 000 I
� I I � , . I � . - , , I . , , - I � I .. 7 I' '� , , i � . . - .w too. I I . - " .. .- . , . � . � _ . I + � . .
, , ,�', � � . .i r .. . I I � .
. w � I . I . .� I I I . � . � , . - I ,., . I . . I 11 ,� m* . . . . . i: "i . .v " ,� . S; 4 , t, . I , t 1'. 10, w I - + , k , . .i , . � . ,+ � .! . .
. . . It t,I+� 1� . 11 . + I ,
I, i, � . � , I � .. I � � i , . I I ,� � it, I ir� . "". ... .11 . 11 � . I . I . t . , I. - , V I ' ' .00 . -_ 1 . . . . I . . I . I I I I
I . I f �, i I � I . I , ". ,*, I I � I . 000mI -�- . I � . : ! . . . I . . to
. . , 1.: . - I 4 '� I �., . I I . : ! . I I I I
I I �11. " u �'* I � I . . I . I i I I I I . I I . !� :; f . ;. " . I . it I It! ; . % "I _+ " ", I , I : � . . I . I . I *; � I . . . I 000k .ot ) I I ;
� , � - I - . I I 1, '' . I ," .1. �e. .; . 1, I . I I , I " I - I I i 11 I . , I if t I . . � .
. �, . .. I I I " I . t � , . I , _ " " � 11 . . . I " 1 , . : , . � L . " . . -, " : . . + . . . . . . I I I ;� , , , ... .... I I - � , . . I
:!. . , . I . . I i , I I .. .. �� ; . . / i ��,i I r I : ,� . , '. . . � . . L ,.
. . , , , I . . . . . f � ; I I I : r . T I . I i ; . . I I : .1
i . . . . � i I 11 _* . I . . I I . , I 1 . - l - .. . . � .
. , i a I , I " .. I � I I I - ..., I . I . I . , , : . � i t .. ..,;", -. , - ,,, . I , . � 1, I ., . I � � : ' �� / I .1 . . * . - I , . , . . . I � I I"; , .. . . �� . . .. ...; zo I I
L ., �; i,,,Nt OTES ", , i I :,. .11 '' . 11 �i -; "., . . ......1. . . .1., -
: . . � L ft� ,, !4. t,� '. I- 1. . . � . . - _ .-.I+ . 1. . : . .1 ".
� I - , I . I I 1,41 "'..'JIV, � ., 1) e','T. i-, . ,� . . .� I'll,+ e I . I I I
. � . . . . . � .
_ I .; . I I I . I . ", I . I
I It I I 1 l I - - � ", ,,, . - : -..:. I.- ., �. " �,�'I, A I � - I : "I.It 1, ,, . �:,, �,��_ ,?I .# .. I I � i,: I ,., �.: "I. .11 . . . I . .1.11 , lool , _I A i I I , . .1
I I ;I-,_ I .1 I :
- .I!,'�g:� 1-om.m.. ., _:� wr.,..),I�,, !,I) I . .
. � I 1� . 1. � I : . ., ti" - �.,'. . . I", _�,�,, 1. I , ... .1 I I I ,I too I q t
:. . : t ?. 11 I " r I . .., , '( " ' ' ' * ' 4 - -r� 40 " .'y - ,.l., , r ", . . i000 . : t . .
I . . 11, I I I � I . . . I ; . I . I . J .1 ; . I I w � � _ - " lio " "r I I I +.. I . . � I .-*, . .. . I � - I., i , , . .1 .
I 11 " 1. � � I It I. t 1, � , � - I . � I' , I I . . t. , ; 1. . L� ' � . � �. I :, '' ", , ; , . f ;
. . � I . . � � . I . "I , , ; I I I - L - I . I . � ,�. to * . . I I
I . I
_. - - " ' . I , 1. , , . : . . I � . �, ; ! I I I . .
I �_, 1, .*TO REPAIR EXISTING PAVEM It ,. V� . I I . ��. ", . li L . 1 1 .1 11 �' - . I . I . . - . I I � , , �1 , I . - . . I �,
I �' i'.' I
I 11 I ' t; "CONTRACTOR' . . ! "_p._". I . , . , 11 - I � - .. . J' ..' ,. * 2,_.), 1. . : I . o - . U � . : I :�."..�, , .; ,�. k. � . - ., 1. , I . -1 .-I?!--, -I " 1, , I ; � . I . � _ , i ... ,:. . . I
, .
, ENT,'DRIVEWAYS0 , : I � � . , I -
I . . 1. - - " . , 'I.,, . I � I I ., . ., I . - , . � -.a n I" .. I . I �
' i I" I .. f I I _ - � � I . .
''. 4 - � . . . � .
. * � , I "; A * `7 I . ; . I 1� I
. ., . I l , , . I ,,�, - tl. ,_'. -_ - - : , , ! - I 1, - '7 4 1 1 1 I -1 I, I ; � I . t . . i +. L - - .1; I i .�; 1, tt� . I . . 1. I ., � I
'.. � �_ I , . 1. I .1 .,�, - . '�;. I I ., i .. . �. ! I I .,. I . � - .
. , 11 . :, 1. . � , . 1. , - I I ! I -. I ., �'l i . I i.. . I . . ; I
. I .:1 � OR OTHER. PROPERTY'DISTUROE6, DU91W,'THE. .. . . ,,,, I - ��- I 1, _ .; - .. , 7'. I . I 1, , 41B I . - I t I . . loot L � I . I : � . . + . .
I �' ; � , 100URSE. - ' 14"'. - , . � . , - , i .1 I " '' . ,,, I . . I . : .. ., I �,�' I . 4� - �
11, I . , � . ,, I . e t ,� �i -1 .- t - '. i - .; . r .1 . r . " .�,_. i wo, .11 . , I .., . I
�, 4 ., . '41 . I I . , 1 ,4,. - I - . I , I .. "t "; , r " - I , I . . I I I . !,ol . I I , , . . - - I . I ., , . - � , , . I . I . . !
- . . I k" . � � ., , I . . I - - - , , , � - : t , � � q - 41 I . . . , . I . . . I . . . . I :, . I
,
� �! , I I I I I I �� " 'PO 1. � I .1 . I 11 . .1� I . . I _4 * , , .4, 1 .. *-* � , � . ,I � ., I . " . . . . I . . , . . . "I " - . I i
. I I . � � - '. � , , . .- . � . I I I I . . I I . . , . . � I . , . ,.;. imoo I ! , , , , � , � I I � . . . . . . . I . I . . " .. I I
1. ' * . - �, f A I. . .1 , . bv 111�G'QOPE 0 (ENTEkUNE � I I 1. I .." o,,,, � . . t . . . � 1-
. p I _ "' ' �', ! .' _L,j�'� , i � , :
. I ." � OF CONSTRUCTION. , I I �, L, I ".. � . It - I I , I - p . I . I " . _ �1 I I I � : . . . . I I
� . 1 11 . . I . �_::, - I ,,� . � . I : . I . I -_ , , .1 . i . ij t 1! i.-, 1. .. , . . : :. I . . . . . T . , : 1,;.. ::1j,t . . ;!, '' :, ,* I
I I I I . I IV � I , - - . I � -I �__ - I I .. , .", * . A. , ! .; . � : 'i f . I .1 . � 1 1 . 1 . �
� . I I *: I I . . . I � I 11 I I . , . . , . . ) I .1 I I . , : 11 I ' 1 .14 if o � .... .- - . . . . . - � .. . . I . . . I . . 4 .
� I . I I , , , . I , t 0 - - � ': ; it , I. . ; . I .' , " , _: - - - � I � . I ; � . I ,w I ."i - I I I I � � . . � I I . . i : I "
� , v � . . I , . � " " - . �_11 *1 + . 1. A : ; *_ i � - . 11 . 4 1 . . . . I . I . 1. � I 4 :; I
. . 1 4 1 t, .
. ". . � . . " � . . � .. � - , . , . . .,� � I . I I , , , I . I . _ ) . I I" 1� I , I I , - �.- I I I I , . . . .)
, - � :,I I .1 , " , * ". . . . � , it. I I , I- . . . � . '. . . _. : I . I , I I ': "; -, - I % 1. , . . .0 - , . I . . � � �! I �. ". , '. , :i - i
. , � , � '*� '. ' "" : L I , , i. . I -A -11 . 1; I . . , �: 11 4 I.,
I I "t * . '. 'i 4 I .il 1/ ': ". . I, , :1 - I " � � . . .1 - . r III ;��, . �. ,. � I , " I .� � . 1, �. -
I � , � . I I � , I , , ; I I i . � I . . . : . j , ; ,
1� . - � . , , '* V I. I I 1� 11. '. - "I - _)k � . . , I I � I 01, . I ; I I . . � I - 1. I - � *:. I t,
. 1. . I I , ,:i,� , I I # �, b. I" I , . : 11 - 1: i.. f I . - - . . . . . I ,�i I r . . I , I . . ! I , , N "I I I . . . I I.. . I . I I . . �
I . . � , . ) I . 11 L 1, . 11 � I �. I', . . : �
I I I " - � . I , I I § I � . � . . . :, i _ i'' , , , -,-,, I I I . I . , I . . 0o .1 , I I " ! . . : . _. . , I I I I., . - I . , I . I ! . ''! -I.; "� �V; , I - '; ;. I
� - �� I I . 4*. , : ., . 1 , , . : I - I . o � I 1. 'ti I , : . � , , I . I � .. . ..
. �_ I , I; �� ". I � 'j 1 1 : ,, I . � � � L I " I . l , �k, oo�o .. . . . , *1 1. .. .- L. .. . 11 . I I . I . ! :., , . � I 11 I . . . � ), . ,- 11 ,� I
I t . - I I . I I I , . . I I a . . � - I . . . I
-
.
. . . I . . . "I .,;-'CbNTRA0TORi- TO VERIFYr'ALL7EX`UTIL1%S. AN . IMPI -.- - EATS., I : k, i, I " - ".:, , . 6 . I I I I . .. I - 1. I . A �, . I : I I . "I . . - ., . I I _ .** ,,,, I ,tl . . .. . ... . . . �, . . . , . 'i - � �
- 6 �
- .� I -�. 11 1: . . I , .� , . I I "'. :1
, . I . I I . i,; % : . ; I I . . .. . � I .. " . . I , I ,.� ''. � . . ,; . I I I � . . 1. � . .. �. . :1 ': .� .I �
'. . ; - ' ' I I � i 1 4. � ". , ,,, , , " �, . . , � . I I - - - I' .. . I.. . .; � I I , I � � I I 1, ! ... . 1, � .:. I . I I, �w . , I . . 1 I I I . . . I 1 14 ' ' 1 [ i " 1, . + I I �
. .1 11 ., , 1 I , . . I 1. .16 1 _. : . I .. I , , I . . I � , . % I I , , �,. . I I;y.- . I . . ., , . . . L I I . I 1,
I ' FIELD., PRIOR M. ANY. EXCAVATI ON.,."_ �: . . . ": � I , � i_. " . . . 1, .1 . I , n ... ... t , � � � � , . I I . t
. 1, -'r I , IN . I I.. �` - . ".. I ; .,�.� -, �. "'' t j., . . . � , � �,: - I ti, _. . , . ,) - . . - . , . I . 1-0-iP.T, - --. ;- I � I I . I . I - I I . .� � I . � .
. .� 1. I I .1 . I I I I . . . � .
� 't , ". . , � � �'_ . � - I . I - � I , .1 I . � . . I . . . . . � . . I � . it . 1. I - . . 11,� i
.. .�,
. . ". . c . . . I . .. I -, . - " ' , L., L . . . " , .. . . ,V . .ow- ,7 7 I I .1 I I , ,� I . . . . , . � . I �
I � , ,.: . , . I _; . . I ,�. . ! '416 * I I I " il . .. I I ot � . . I , .- . �. . , . . . .
, " . " � . � �. I i I I I 11 . ; I . I .� I . � , : ;,,. , . * . . , I � . . I I 11 , 7."" 14 i . 14 ., . - - '.. : ..,. . oo I A i . 1- ,�, . 11, . . ", , . . . . . . . I 11 . : I . I ! � I r , .1 .. . I i 4 � L
- . � � . .!. I . . � . . , , j . . :. �,. , d % �! I I �t . i I., . 4 " i . I _'t . � . , ., . . I . I I . . . . . . . I - I
I z - I . � , � I .� . �.ii, � I I .. 11 ,I ; I I I I I . * . . . . . I . . .
I
1_.I11 11"..." .1 I � I . ! io: 'i . , L� . .,� , - .. . . � . , it 0. , ,I � - � I 1. I I I . � .. ,� . ". : � i 1*1 . .." . I 11 11 .., . .- I . I i I I I . � .. I � , I � . . I .. c . I I I I 1. . I . . I . . j , ; . , .. . . '! I I . ., . I I
. , : ., 1� * - 'i 11 I . I � ow . . I � . .1 I I .1 . I - . " - , . . I . . r.
'.' A I ill- �- 'f .11 .
� " d ; � I - , . I I I . f . . . .� . I _ .... � I
. , # . . , 11, I . I '. , I . . � It . I . . " I . � 1.
?, - TR . �. . . I . . .. � . . I � . I I I . I �: � V - . I .r ;
. -
I -3." COORIDATE�,ALL C04S UCTION'.WITH'THE CITY OF EDMONDS". 'tL, ;-, . I / . , , - , , .
, - "' . I 11 I ,.I" , I .- 1�_ I too, . I . . . I -,:.- 1, '' . . I . I ? , �,, � , . I I
1: 0 � ,01,� , I'l . I I .. ." � �+ , . ,� ll 5 1 1 , '' . . . I : .
� I . I , I 'j, ..., . . .11 , , . . , I � . ., I 1. I ! '.; I I :
, r 11 - . -
� , I � I 'k, , I 1, , I �. - .., 1. : � .. , I i . � � . � I i .. I I . , I . � �'. ... I . . . . � . ''. I . i ;. I ,. - , 1 I ., I
I I I , I i I I I . t I . I. , I r "'' I - i�o -_ . .1 i 11 ,l, I : it L . I � . . * ; . wo! " . . . . - . � 1 I . . I . 1. 1i . ,., . .11 . I . , 1. . �
. � I'' ""
: -, ,il, , , , . 11 I J. I - I � . im 01'' ' L ': , .000 . F I , "I
I I � " � 1, I � ,,, I fl,;, 1) , � 1#1 I . . ";7 1 � . I .T; - ,4-- : , ow I I I . .11 : ; I � i .1 I I
.
. I I ... , .1 I . ,ii. , . . �f,v� - I r I . , � I � , je � I . t,e I f 11 . . I : I . . I . � I I ; . 1, .:,�i_,` .* . . I - � I . . . . . . 1.11. I I - I !
��,, �.DEPARTMENT OF PUBLIC WORKS. I . � , 4' , � � + . I �
I
I � � 11.�Ii� , I . � - .i;` � 1�. . . , . 1, � : I . , . .. I . I : .1 . . -
4 11 . . $ , , I � I I L . . I ., P �:; , ., � 111. I I 00 I ,-1 " . I I �� I., , ## I
�_ ; : � . I I . . . + !,_��,*' I . . . L 1, � �". � . . , . I i, 100 I i J. % : - . it . t . I .1 . ,% 1, ", If . I I I I 1, I I . 11 ..
� I . I �, . I I I .. . 1-:11 , ,-�_'., " I,lj ". I I � I I L I 11 . f I I ! , - - #0 � . i I � j''. I I I I � � I I . � 1, . ;...'', ,,, ...I � ". I . I . I . I I I . . � .. ..I, .. . . .
� 1! ; I I . � I � 1 . I s . I I �, I � I I I I L : '. 1;, I . I . � I . ... i
I � . � �,,� .',.j_..,.. �,,, . - I � -1 .. 11 .1 I I I I . I I ( . L. I . � 11 r. . I I .. I I 1. I
I
- -
. � -1 I. L � . . I � . . � . 11 I I 1 i`,+.". .1 . �: '.11. � I � - . ..... :�. .- - �0 -, - , ]-,� 1: - . ... ... ". . .1. - I—— - I - .. - , . . I% I- 1. I- - . I It I .� . � . . � . I , I... 11 I �.'', I I . . I. 11' '. " - I 1 . . . 1 I I . . ,+ . . . I
, L ' I . I . . . I , .��. 'I, ,.,: ',.�. I I . I I I . 0 I I . � I '. .1 i I . 1. I
: I I � I � . . . I., � � I I I I � . . :, ". . I 1'� - I I . _. I :: --.:I,: I I It , . . ! I - - 000 i - . 11 I . . . � I . I I .. I _. .+ . . .- I I
. � � 4 .. I � - - ll I I � 1 4 1 . I � l . . .- � :
c. . : ,, -I 1. � . � . I I � , , . ,
� I .. - . I I I . I I I . .L - -, .i,, , ?. . I . . I \. . . I - . .
. I t .� " I t . . . I ". . .. � . '.1 I . . I., I �. I _ 'I, - ".. � I I _: I i , I t . - i ` -I' 414 I -7�, 7T., . � ,:v - ____ , __ - - I . t, 14�1, 11 o - v , . - . . � . I o . .. . I " .! - .. I , ,. , , I . . I I .. .
� I I lLt, . . . . ! ". . . I .
4 - I � . ,. ,j,7. !; '.. , , "'j, A. - �(., I , V s% - 11, i: . 't'!. 'i,,*. .. , oo .. < . . . ) . '. .+ .
, . I .. . I.I. I o _. , ,; , -y i �; " k>ir, - ,fi:' - � 1.1"I't, - � "I',""' " . 1: �,t14, I .� !. �' j..; 4 "I , .100 ., ,.A. ,� : �t_. �Ilet.. I - " ,� ; I . I . I . - I i . � . . .. . .1. I
.. . � �, '': - � ti, , .. � _1....' � 11. I—: . . I . I—- I - :, . . ,� �, I I . 4' � . I ,% I L. . I . -, I—. . 0 . , .
4 f1..11-_.., __ , . , I � I � v�, , , le. .� 41" � .., .. - � I I . _. . � 1! 11 . ...�_ I'll"i'l .....,.1. -1 , � i, i.i. . j , " I ..., �
_,.r, , ''. . " I 1-l"'.- 1. 11 I . I I � � .. . � 1. t ..... 1 I .. I - . . I ..
I .1 _ . I - - .. 1 I'-.' . " I " �.:111.� . . :.1 I . 1 ".17 . . . . . ... I . � .. '. . . . . r ,..:, . .
I , � .... .. . 11 11 ', ., " � I v , I - . 1. 11 i�. .. - , " - , , :
I t I , ''I � 1- ._� r - ': I .. .,-. " � .. _ I., , 1 -.c - - '� , -f �,! �v;* � `�j ,,, -', I �; ., I 1. I#-* 1. I %, I '.... I . ".. . I I r I I I I - t t .- % 1. .� . - .
, . . I . .
: Ll . � . � "! I ", :... I . I ..t.. �.+ , I - )..* . + ; � . , � I ' t
. I . . I .. .0* � . I I . . �+ ". . I _,�.. - � . _,._'_ .
' - - . . I 4 � . I I I I . I . . t I I ... . I I ... . .� .11 ; . . I � ,:. , ''. . :
. , I _+ 11, 11 . - - - - -I-, ...... - .. . , ,_ .
. � 4 . . 1. . t. I . . I I . : . I 'I . . I � I . *#* � I . I I t , I . + I � I . . p , . .
. .. . 11 I �- � '. Im I '. I I . . � : . � � �, ', 11 I . 1. I I- - , ., I I - - , . I I
. � i , - - . '. -i . 1. I . . .1 ,
I : , . . I I I . I . I . I � I .0, , � I . I I � . I . I . '' . . : .. . i� I , ., . L
I � ; ,_ I 'PROP, OSED. !-W8 b " ." " - I . � , _ I . . � ! I . . . . I r , , I I I i�c I .. I I . .
- . .'.. .1 � . I � , J_ . I., � 1, . I I . . .. I I .11 I . . I . I . . . � I . . . . I . ... .. z.
I . i swamp."= 1-1 . . I .. I i , I I � I � . " � 1) I � "% � I 0,00`0 .. � ''. I I . � I - 1 . . . 1.
. L. ( 4 � 1. � f . � . I � I I ', i . I . . t I � I L , . , . .. . � I . I . . . I I . I . I
. � . 41 . I � � 11 .. . It I . . t I ; i� . . . . . q , . 1. I .1 . . I . I I " , I :. I .,: . � . I I I I . ..�i;-- ,. . . . . � ., .. I., - " . � 0 . I . ; � I I I . . I I � . 1, I I .
� I � I . r I I I . I . . � . I I I 1. ..., � v I � I I I . � I . I .10 . I I., t . 1. i . . . . . I . . . I i . . . . + .1 I I I . . . s �
- I , . I . . 1. ; . I I I I % . . . . I I f 1, ; ! , , I
. ,r I I � I � . . . , I . I I 11 I I j . . . I I I I 1:1 I I t" 11 , . . . . I . . . . it !,� , "', '. - . � � 4 I . , 11 , � � . L . . , . I , .
� � I I I . I � . . � I � I .. I . . I . I I I . � ; I . . � ; 1. I .0 ; I . I I ,, . 1. . I " I I I I . i . . I I . I I , I : , .. , , . I I I � :
I . . .1. .1 44 w '. . . � I I . I �. - . I ', - I I : . 1 .
.
. I I I I I " . . : , .1 11 . . I * . .. � I - r #4 . -_ , I . rf t. I . I � � I , � , I � , . . . :. �:, 1 , . t I % . . . ,� � j -
. I 1 - � , . � 1. . .. I . . ; . .
. I I I ...It . ,!�);, , � , : I I .1 . � 1 L ,, � ..1. I .I , . 412 " It I �.. I do I I j....Lq!, ,�', + 1�, 11 t � I , 11 I I I : I I . � I IL I . . it 41 .-. 11 . . I, I . : , It + I . , 1 . . � . . . . I �
I � '. , - ,., � .1 ,. " L I I , I . I � . i . I I I . I I .,: r � It .1. . . . oe ; ; 1. �,.; I 1. I . .,-_A�w000000000"i' � - . . . . . �
I I . 11 I 1. - ,�_ . . , ., I 1. I I . I ", - I., �. ... , _ I . '.. I . .,. I: i,.:. � " '' _ . I
I. � ; I . . I . 1, , � .; . . .. � I. �. I .'� - . I , ; . . . ; . 1 , , . .. I . I , I I .
I I � . I . . ,; - - I I . I I L I I I I 11", . . +.
� I I I . :'"' , . 4 - �' . - 1 I . . . . 1 ; I �
I,- , 11 1. . ,. T-Y P E I CATCH BASIN 1. . . . ., - . I op I '. , 1! 4 1 I . .1 -1 1. I . I I 1. � I ; .* I �a .
.
. I . - . 1, �. ; I , . , ': ". - I. C-3 � � � kt. I �..t .. It '. , - � . , 11 . .� ( , I . .** t I I I .. I 11 t i . I : , .. . . t , I I I I I 1. . .1 , , I I . � . . . . I �
� I � ., � . I . , , - ... � . * .. . � I �... " I I I I I I . I I . - . ".. - - I I I I 4 � I
F � - z I . I ; , !-. '41 1,� � � I 11.� - i . . . I it .. I . .. .- .-I. i I �, t I 1. . . I � I 1.
� I I . � I ,+' I I 40' I I I I .. ,. I .
. I � � I � 1. � I � I �l 'I. I. , :, :1 , .: .. � . I I I . I . .. .��'. I . I I � I , ; I 'i ... I I I 1; .. I.; . , . I I . I I I I � . ., . I ..............� :1 '. - . I . . I I .. � .., , . . . � . I
� � �: � . . ;, � .1, , . . . . I . .. I It ..,:; , " I lw; , � . I e I I I I . . ( "I It +.. " � � . � . I % . I . . . . . - I I . . I I . . . ,� t I ; :
,� r I ..", 1 I . f. ii. .. I ... �� . I ... 1'. . . � le . . I " I '. , ., � , .:, - 1. 11 . .1. - . .1 � I
I . I � I I . '_ 'i � ' ' 4 i. .' TYP 6 � . , . . . . I 4 ;� .. I . i . : ! 01 - I I . - I , : : 0 , 1 .00 � I . . I . I I . . . I . . I I
�i � It . . ' . ,.. � - 0 . � . . .. . I . . I I . � I w I � . . I . . , . I . I � . . . I I � .
. , I . . E 11' CATCH BASIN , . I , v ., .11 ..1 't _-� - I I e , , . ; -.,�. . : I I . I . , , " 1� � It . . Ikk I. 1. I I , . I � i't I.., . . . .
. I b I I... � � A . . ., I .1 . I . I I � � �, -1 s"'. . . .I- 4 + Li - , . I I..'' * I .1 I � I I . . . I I . I I I I 11��I s I - I . � I I . I. . ... . � I * I
� .. . � I— - , � I 1� , . I , I +�,. 1, � - I ; � I � I . + . I I . - L I . I I . I , I . ill . I . � I.
I � � I I . �� I I' , I . I � r I I . . I I '.. I . . � I , I I ; . � . I , . ., I � 1. . 1. . �. , I . . I I I 91t1i, � � - I � I . , . I I . � . � . � . 4 '. e .
I I : ; I L I . I , I . � . ". I � , I I I I . � 1, I . � � i r . . I low . + + I I . . 1, . . I . - � - - _-m , I . . . . . .
-
, - I �. I I I . I I . � � . I . I . . . - - -_ - - , -a%- .. , . � I I 11 . I . 1; . . .1 , I .
. . J, � I , ,., . , .1 I o0o I .
, , j -,' , I I . I , I , . � . I . . , . I I I . I . . � � . I . . l . . I . � I . I . . I . I . . I _
I . t ; . . . I . I " I . .,�I., . .. � io� I . �. I , . � I I � I I .
L - I I I . . � i,� . �- - 1 . � ro""'o" I ,, " . . .� � . , . . I I . . I .
. L . . I I i - . I . I ... .
. � ! -. . . � -410,., ,� ke �. ,
. .- . � - . ! - * � � I I - .-*' ,, . I , I . .0000, , - I . . . I " I t
I . I : .1 . - _,i ,- , . STORM ORAIN PIPE ; I . � , i_ . . "'o , I . . : , � I 1\5 ".. . 1; I "I . . . .
. I ,� , I I
I . ___ :. I � I .. . . I .
� ; .'ti . . + - , � I I I . . I . -e , : � % ... .i 11 ! .1 .
. '. , . , - I �. . ; ,�.` , . I . I I I - I . . . 11
I i'l � ? ; -, . .. . 1. - . I . , � I . . I I . � , . .
., � 11 "I . I I t � I L . I I . . 1. I . + I . . I . . I *,:;,, � I ,%' . I .000 - . I ,: I L� � � . " - . 11 I I.. . L. . , -. . . . . . I I I I
. � " . I. � - 1: � I � _t� I . . .. . . . . . It I I I � " ,,-,'.I - .1 . - I I I . ''.. . . _. . . I . : , 0.1 . 1 NNO , . : _� I . t I . � I . . . - . '. t
I I I I.. I I . . . . . .", - , I �;" -1 I .11 o to, . I . .'' t, I P .1 � I . .
I , . I . ; a . I .I � , .� 1 . I . - , �. 1. t . . .-, lI, _;,,j�., " , I . 1". . .�._o 1: r.. 1. . . .1 L I . I .+ I L . i � . � . I I . I I I . . ... � I . 1. �.
� 11 ... �.. 1, .. r . � I I . . I I _ � � ., 4.,.,( ,,� I - . � . - � . , _! , .I I ,� . . 1. 1, .. � I . '. I I . . I . . I .. . . . � ; I I ... . . :
. I ,., 1. I . I � . : �. . .. . . .1 ; � - _ . " . . �.
I 11 I � I I., I � . I � - I 11 . , - , "�, . . �, 1� - I . . . . L
. I , , I .. . .,. , _ I ..! .I . " , . I . 7 . I . �
I I.. 11 . * .1L a . I I , . I - . � ti .. It I ..� " r.. , .- - -,. " 1. l'. It . I I . I I .. � I . . . ... � . 1. .1 I , � . - .,I, I .. . . I .
� . . li. I t - L � - I;— .l. �! �?',.t r I A, . I . I I .. .. - . . I _. � . - � . .; . I . . I . I
� I - l I . I .,I I �..� I . . I . I I . . 1. Ole , I - . i . : I 11 � ; ,I t , I I I . .. '. I . .
� � " +. ml .- . . I - . . . l, I "I . . � -, - ,� - . I 0# ... i, * , ( I '' I � 'L . . . . I . I I I 1% !! I I ,. ,.1.1 - -, ,; � . .
. � . I ' .. - I , .. I .. + . 1 . . : I . . :.. ,
� _ Fn SO �,` ... ,_ 11 �1.1-. .. it _'� � '" " l , ! - I t -, I . .oll.l i I � . . , 1 . . . I I._
� . 1. " EXISTI .L r= We 'v 1: . ' :''L " ' . ... �, . � I . i I '. I I : . . . . - . : .
. I l., � . lilgG , ". I I 1. , , __ __ I . 11 11 � .1 , � ,r . . . . ., .1, . I .. � . ._�. _; " I., � 1 '411 "' - it 11 : h , � " � . .,�; i : , , , ", I it, ", j , �, � .., '. . , .t, , '. , . I I . - .
11 . , � � , .r � , � . I I e
. . . -1. � �,,� ,., . .1. ? . I I " ., I . I , � I � . x , -�,It .. � , I , - , . ,' t . ., ... . . - I .. . �, � ... . I .�, , . I I . 1; - 1. . I . � I I .
. I ,� q - I I - � � - - - - " -oo '�` " .-ii, I . ,� , I � I , I m. . .. � ;, � I .. 11 . I I .
. . . .- -It , , 1 . I . -1 � . . . . ,' . , . , � " I , . I , I . I I I , * I t, . . _,._� . I .. . I . . . I � - , �. :1 , r � �, . I . - . � .
I I � . �, ", - . I , .. � , I- , , " 11 -1. __ :. - . , _: . 1. , - - . - I . � . .. wt It t I,— - " � - I I � , .1 I " I . , . , I .- .l;, ?'_� - - , , . . I .1 I .1 . I . . I ,,, It 4� �o . I . � - . .; � I. . . I I . I . - I - 1��, .
� � . . 11 , .. - - .,I I _ I 1, * . , , . , w, . . , ., I .. , . 1, . . I. ... - ; ., I - � I I . . I . . I. . I I . � . - . .. .. . .. . - .1 7 I - . , . �_ , . . .. . .11 . � I � .. . I : ,
. I .. . i , � I . I '.. . . 1, I I . . . ,. I , " , I � e I . ", - '08 . - --�. I ... . � - '. j ...0 6 - � I . � . 1� � I I 7 - - I I . "I. . - i, ) , I . . I , I . I . , .1 . - . . . 1. + I I I � . . . . . . I
. , " . , I ... A , . I � :,__4 .,. I- -, - I v .; . ., I � . :. . � � , ii, 1 I ... �' 1 . . I . .
� I . I , " , �. , r � -10 C, ' . - _. I ..'%. . .. ._.... . 1. , ,_,�. _'. + ., .� . . I �� - I .. ol�_�, _. I .. I - I I I.
i , I . '* IV' -OLE ' - ' 7 ' '. 7 - - I m .� ,� I . , I I . I I , 1. i .1, '' I i "". :+ .i", 4: - 1 .. I I � I.. I . I I .. � I _� - . 141-- .., ., 1. � !! - : - . -.:;_,� ; . I "" I . I I
. .,ANtT*`iiSEWER Mf - ''. .: ` I ", ", - -j\ , , ;" .. � , , : � ',�, i 1. , �A,:+ . -� - I 1,11 t� -"A 1* ,- , I . I . - I . 1. I . . I "... . - 1. .. . ., . . . - ..
.- . . . , . 1. It . 1 ,/ ,, r t , ". , ) I 1. � i,,,.. "Itf) .- - . . . , . . .. . . .. , �..�
. �, .. . I , . . '. I . I �. -, I " __ �,;. '. , , - I .1 1;, ,It I I - I .� ., I it, . � ,. I I . . I . L . . � . I I -, - - . � .
I - , 7 I .%t I . I, � : 1. " , , .. ", -, t" 't I .ifl.. 1, - ;\ -� J., �. I!. . . I 11 ., I ". I + , ,� .'. 1- *I: ., I , k, � ,, I . I . . '. . , v . I
� , , I � I. l, , : , , . 1* , -'- -� ,� ,�,,' *,r - " t :. , .,. * -; � 1, 1 - : 1- " . . . . .1 � i � - I I I : ,,:, I
t . . . . I � . I . + 11 .1 _ I - - - \ � .. . . I I � :- . I . , � ", . . I .1 . .. . 1. , � I I , . . _ � .- I I Ito . ��. I . I ... � . I . . . . . . I . . .
. . I I I I . . I - . I . ;
, I , J, ., , , 1,, 1; "_ !, : 4 1 . , , I . I . . � I . t . , . I .
,� . :'. -- .-, -- SEWER LINE . '� . . I . : . � i .. I ,,, I 1. � . . , - ,ol� ** i
I - � I � .. I . I . . . . .. . . . I I :'. 4, .j , - I ., I - 1� f, :, �.' I - , -_ � , � , I � . t I I :; ,� , - - - - -I. - - " : , , ..., � . 1. _ .., . - I - _,� .�t " %, I 11 I . , t. I , I I I . , I I . % � I i - I + L
I , , � I.. L � � I I I '. . . " , � I z . . ., . I . " , , � . I . I � I � I .
; , , � ; I I ., I : ,'i , � . �'.. . __ I I - . . . , '. .... ill I � . , ) I � 1 . � - It I . . , . I , . . , I � I I . �- ", . : . I I I y I � I . . � . . . .,- - . . . . I � I I . I
. I , � I I . . I � I I I I . � � . ;
. . I .. 4 . I 1 . 1 , I I . I .
. � � . '. I "ATCH BAS11N %, - , I , - , 11 I I',, I ,�, . .. � . . I I I I , . . I : . I .11 ! I I , 4:.. , I . .. I
, : a f, . '., 7 - i I , � ? I I . . 1+ . t, I I 1! I ; . - I I .
I . .. ... . � I I � L , . _ 7,. , . ,. 1+ ! . �11 .. , - , , � lt, I I I . I I I I .. . I , .: ., � . . , � . �: : . , 'I , . . , - . .. I , . �, � I I � . . I . I . . :
I ; L+ L I . 11 � ; I . �* 7 : , 7 :: i. � I . I I I V, _ - &I q . " . I . , . I I . . . I
"'
I I I . I I I �, I -, . . .1 . , . I � .1. � I � '4, � , i .,k, �.oi ��4 1 1 1 , , I , rt . . , d .1. I . I
I I 1. I i I . + I . I " v , I "! ." ,i,-,,j % , " , I ,` -, it, ." ( .- --; . I I . . I
� . , . - . I I j ,. , k L,
.
, I �, �:.�, -To v - DRMWVANHOL&� - . 0 ; .11, , , . !., - . , ... I— ,� , ,":, �_'.. � r . I � . I �
I I ,� ., I I m � . I . L I I I . I 11
i ; " �` " I 1 4 1 . . . " I . I I . � . � . . I , , , i, : ... . . r I .1. ; . � ., I , 40f 0 I - : . , .1 . . . I . . �
, , , . ,�, ,
I : : , �, - � it . I II "T 1 ,t, . .� . I t ", . I I I I . I . . , . I 1
4 . � I I . I . I . . . .. I . . . '. .:, 't.. .1, . 1* ! , ", . , - . . " . , � " . ,,, � p .", , I . .1 . I I . . - . . .t . - . . I . , .. . � . ( , I . , , I
! � I - . �- 'I I" . . � I I I I . . , I I 1 I I ; . ., I . , . I .
� I �� , ,., - : . � .. . 11 . � . I- . ! . I . - * .1 -.. I 1. - � - , � . 't " - , - I . - . . ': 1_ I I � .1 . ! ,_400 . _..,,,,00000`o * , I- � It ., I I I , . I . .. 1. . . I - : I - . . . . . . I a , , I
:i-� r " , - I I ,r I : ., I ,.-!,t . . I ; it, I . . I
.. I - , . �_ . " I , , , - r - - I ., : , . , , - -0 %i- . . � . I � , . .*. ,.
I � I � 0 , s , R � I , � t . � - I I I I . .1, . .1 ,.i_'_" -;i � . I � I . . . . - 4 .
� . I 1. . . . I � , : . � . � , . . . , , . - I I I I , -, , � , . � �
,� , ! r : . - - a - �
11 01 , . . � .. � . . I .
.; . I . .1 . , " � : I � : - i'. � k , - - � . I I I . . . ; L � � �', I I I . I I - _ . t .. I , .1 . ,. � . I . I . I I . : I . I I . � I , I i! . �
I . . � + , ,,� ; I I .. . I '.... I . W I � " .� - -1 11 _ I I I . �. . I. I , ' I . . . . . . . I � . . k ,
. � - , . 2L 1, � � . . ; !� '. 0 t . ; -_ : ,It I . . - I I . . . , .(b 1. . ,
11 � I so*--. STORM, El ". , . . -11 , I . . � , �. . , I . . �., 1.171oiq!r.� t.%, ,!., 4"'t 0 1
, 11, - . . , DRAIN LN , . I ': : 11 . 1. . �,ii . :1 . 406 1 :.. 11 . ., 1. _ I., I I - - � :l I -�? � .;, It I tti;, I i� -
� ... ... . . ..� L_ : -.1 I
. C - _t . ;_ , I I . I I .. . 1. I ,� ;, I I .l . I I I I%'. !�, I it �,
I I . ..... . I . . 111'�ol_, �, I I . ._ ,,:,.,, I I . , + � . P!11( ,I I 1; I I . . .A . . I 0 .. .. I I
1, I . q r , t+ l." ,-, + � . "I . .1 I- . �'., I , I ; 0 ,I � ,j.A . + " , . . I I . . . �, .1 I . I �
. � i'' -,--- WATER * LINE .r, , . , . I .1 . . I I I .. - � . � ',-. . .,� . �, , .-.�� ", -, I I � I I . . 1, 11 . .
4 ' " � r.� I .; . _ I � I ,� . ,1�
. � � . '. . � __ I '.1 I : J I,.: , I 1. i ., I . I. � .1 . I !� t .'' � O., I . A .
. . , I . . ' -, L .1 . . I I . A '. .,;oo� N .1 . I I . . � i : . I I . I " ! 1 4 �
. . I
. I . I . . � . . I . I , I . . i ., - 1 1 1 : � .1 I , � " i F , " , , . . - I . I . I , .., - . . � + . . . I . .. � � L. . I " , I . � . . . . 1, I
. . - , - I I . . .10, 1-1. - I I .. 11, ;*;��_ ; � I !. . : I . .
. . + w .. . i . . . I I I I . � I : I � I . . , ., I . I . , . , , I . ,,,�, , %!� I I . .
I ': � . '' . . . - . � . .. � . . . I . � - I . lt . - . � ' . � ,_ � , , L f ; , . I I , . , , , : , * , , % I I I . I I . ,
.. . I I � I I , . I . I � I I I '.. , 1 ! . - , .., � I . ., , � .. I . . I I . . . . � I � I . . . .. . - I .
I s i! - I , 11 I . I I I . . " .. I, - , i, I � , I .- � , :, , � I � : - - : , ') I . . .". " . , : I , , I I'' .. I I . I . I , I I . I
I �, I . F . " . . , ., ; - . I t of - � , 4 ; _N , . ".�,,. 1. I . . . I I . . ,` . . I I 11 . �
I . . I , I . : , � .-IIJ, : I 1. : - . I . I � . . . ,4; . I . I . .
I . I ! _ 1. \� ) , st i, . I . I I +
I � . � . I . , I I 'to , - , - , , I . I � ; - . � I ��.
. : I I I . . 11 . . -� -7 'I 17_-7-- OVERHEAD _ POWER UNE , .- - I �, -t ! *: -' � I , I � . .*Iw,� Will, 1r, . '_ .:. - I Ili. . ". - -� - . - � , , , � � 1. � I . .1 . :-
I I . * , ', ,r . , " � I . : . im�y I , �:- i -11 __.V. b , , -! * � , , , .i:. l . ''.. . . , " �i� ; 0, I . . -�- -, t . it'. - - ., ! I - *. , 1* �! . , , � 'i ! � . � � I.. . I I . . I .. . . - I . I I . . �,
,
. ., .., _ " _ .. . �; ,. �_"":, I �_ . ". . � .. , ." I . r. , � I I IN . I . . _ . . - I 1 . - 1. I . . . . . � ", . ' ? I ., � , , . . , _ ,4 V I � , 11 - - .. 1\0 �4 , . L '. , 1. . I � � : I . . I + I
. I I . I ,I'. e4:1 *� I I . I I . t . : .
, 1. ... .� . i . - , , , " , .-. 'j - :�" .,. .. .1 .. 11 .. . �il I'' I I I , I _� � I- 11 . .. I % I zJim - . 11. . I 11 ; , . - , . _ . . . . . . . I . . - I .- I . . .. . 1. - . . .. . . I . . I : I . � �
t �. . � I * , � , . 0 I . , � . i, : P , it '. � , ii ' 1. i ,.. l, . . . .� . I � . 1. . I � " I .1 - � � .
'. I . ; � �. - .., . . . 111�: Ir . . - ,. I � . � . c c ; 1,+ �., 1. I , . l. � � v -�'Ir , _' ;,`7 " L�'!" * , , , " I , . ` -,'! - 1. :11, � - � 4 - . . . - 001 I . I . .� : I - � I + . . . . - . ..1. 1 - , *.' - . � . . . . , I . � I . . I , ,.,
. I I 1, , .1 j . � . . .
+ -,
� I . -, � OUND TFLECOM - L I IN C ; I . I i� ��,-' ,'. - . .11. !, I ; I " " . . � .+ I., .
. , i(IL � : I � . . ; Ll il I . A _'l. I I .- . �., .1 . I I . . . 1. ... I I . ... . .. - � .. I
� .. . 0 �, , I ; ,. I . . � i , - . f .. I ;_ ,I , . ii �." 1i L . . . : I I I I : �. � . I . . . I � '. .
I � I z " � � - - - ... I , : , . � I I ,l ,*� , . . . . . I � . I . I , " I I " . -. I I �
"
. 1.1, ,- U li��o �T; �13 , , . . . . I , . I I I . 7. �, .: �'; ... .1-1. s 4", . L I . .1 I l I � I
., � � . I , '' , , , �, I
. I I. � : . . I 1, ,,, . I "..-, 1� " i i � I � A: . _ , , � � I �l I �;) I I . I .
I . I :, , .V, . , 1� I .�� loll I � _11'�� 11. 4 � ; . � I .
;1 I l I I ". I .. ,,, I ., 1, �. ��,�,,+,i . � , I `; 1L 4 �" � . . I
� � I ; . I . - , 1. . :�, . 1, . ;. : . . , I I
I : L, " "I" ' --- � v _ 'i,,it.. � I - - - --- I _ I I �",, �L . . I I I I . ; . . I . . I . .l . I
. I . , � I �.� � ,11 _.. C ?. 0 1 I I . I ! I . . . . . . - I I
. - _ . .. , + , .1 � .. , ", ' �, '404. .11 - - .. .. , . - I ,,, 7 . ?, .. �_:, .+. 1�': � ,t�, V . I.: I . "' I " " " ,.' . " .t , I I � -,; , i ... I ; . I . . . I . . . I . . I I 1. . I I I I .1; I
I 7 - ,3 z, , " � I , � i I. 2 ,,, -;
. t .: , .. " t,. - " - 4 1 , I . � - I . I . ! I r ., �
' "
I .. . C ' R ��F ' � 4 L C,* 0 U LIN I" � , , , ! . � 't , ," � _,�: � " ' .L
� . I t� I I i . - , - . I i . .�;l' , . l ,t. , -.:", 4 �:* !, , � , , � . : - - . . - I ,
. -11 ! i � , . I . �_: . i � , . . . I I I I ; I . . I
. .. . I . ., . . , i. I I . . . I ; I - .. , . I " - ! . 1. : !., it 1. I .. .,
� I I . ." , ; : . I �; , I - i � b� I - . , f, �� , � -_ , , , - .. I .;. I 1, 11 ; . .
I \ 11 1 A), POWER & ' TE 1* I I I : I . .- . ".. - 4 , ., ,, -. I 1. t :i � I I t�l " � . . !
� :1 . � 11 I -�, I I I I " t -,
, :
. � I I . .1 . I I . ,_ I : I . " , . I
�
. I t iL. , .., � I . t * *:*;", -1 I " .' . ., - . . . : - _ . I . � � r I , �� . It I I - . V. .. , . .. .1. I .. '' ; r -.' 4- 4 i i - ,,, 1, � �._ . ql . .. � .1 I . , . � . . - � I . � � I . . .
� I ,� � � . " � � � � �L . I ". I-; �- . I I I r . ! I . � i - . _,� I 1. . " 1. .1 1. . . ��� I f l;L ,. ill , . I � I . I I I v . I i . '. . I . i., 11 .1 .
, . . , . .� � : . . , .1. . I ,� , . + � I 1. . i , I I .1 . . 11 4
.. . �,, , , � � � I r . I . . .. . .
,
11 I ,�,, �,,�,',f-�'� tt. ,� L I I I � . . � t � -.I- I r. : '. .,�'. . _.. �,, r . 11 . � L. : � 'I, I . I 1, . �. �
I-: . .� 11 , ..� I � I . . I I � , , . I � .�.., 'it' j, i,. " .1, ", - li, I � .i . i. I ..
I _ -7��r tlNr , , - , . I .. I I I I i :,' .�, � - , ; . J , I . . - I , ; �', I 9t. . , l ( . , r I - . � I I.. . . . I
I . � - �I � - ��_13, + . I t - J.. . j , ."i . . . + I , - � .- �jt i� 11�1_ . � . I . I � _.. . : , t _ . It t - . . . . . I . . . ,tk � - ." ,�,,N , , .1.1 I . I I i
t1,11K., �� .,�", ,� , :,,,,� ,z� , - i I ,� I . 1! � I I
. � ;. - , _ I ,li ; oi 1 ; 1 " Nl�* �A;J,.�,r ,t.'i. . I'; ". "., ",�', - I. ... . . .. �. ." - , �: �, " �. + , It,, , � I '. I :_ . � , , . . I � k 4 � - . : . .� ; I � . . . .1. .. I . .. � . :
I - ) � . : �l I I � �_ � I . � � . . ... I I ; , . . .
I - , I I . I " - I ! '� .". .. , i, �� ,�� I .. iL 1� � - � ..,- I . " � .. : . . . I : - ` - . � - . . . -
. *' I � . " ., . I I .i* _��l . . 1, I 1. � I - . . " I J� : ti; ;* " I0 ��',, -1 e.? , � . . � .. i � I ,� 7 ,,:-. � ; .., f'. 11 . � ". � . :, � '. - ,.I . I. ";".'� I I
loT,", , '": i",, .''.."'; ,�i, -'., , , `� " 'L .1 I ., �� . .1 .,111 . � ! . .� I � I -
. " � , . . . . ; _ . , , . __ � . t t � .
. � I � .�;i. ". � . . ��, . I I ,�:' 1;� t"'t - �, " .1, '' . I . I .
, . I I I . , I I , - I. . "", , , � ; %l,b L, I . . - . � - - . _ I �. Ix - . . . I 11_� : I �11.: 4 'i , " f ? . � . � I . J i . . . .1 . , �* I ,! I . - , , . :
. _ � I . . I . : � ... , . - � j I . . ,. Ili, I .. " , '' , I 1, � , I . . +1�1 . I � + . . � 'L' .4 - v i . � I 1: I ,!' I . . . I I . . I I . : , I . � I .11 . .
. I
. t� , m I A—, I . I 11, I , V , . . . _ , , i - . 1, , , I I - . . , I : . . " I . ,; f. �!, . . 1,
I � - , � , . I I I - ` 10 �*_ I , I � I I � . , I I I . , � : I � I I . . � I I .
,
; I . I '_ I . � 1. . - . � � 1 I �+ + . . 1: % , I ;1. i " -* , , 1 � : � , , ,�' , i j" l' " ; ; , ., � - " " "'; , , i '.. " I 1. - I - � i � �s � 71 . " ., " i i � " I I I I I .. I .
I I + A , � I ,,,,, o I I . - I 1. I � I . . . :( , I �r 1. .. . + . . , l ,:' ; � t . " I I I I I . . � I . I � I . . - . .1 . . . �
I I :1 . "'o , . ,�,i� -, I ; , . . - I . I '. I I � � I , I -� , I . , ., " I ., , . I - � .
I t I I I I 11 I . , I , - . � ' L ' % . � I .1. 1. . I .. ' I .1 .1 '. -,. . , , I . . I . I . - , .-r-, , t � e I : 1. 11' - , , , , , " ,
. . . . , I � � . I I I. ; . . , . I ? , . I .
.1 I I . -� .. . I . , * - . i . , I - - ; , 1'.. I ,,I, ; . . . ., I . . . . I I :
, ,I 1 1. 11: 11 ' j . I � , , ' ' - _L"�' ' 1. I .,: '� I; � " 1 ,� � ., '. tif ; "!� t I . I I . . . I.
. . � I I I� .. I I I . I . � , , I �l . I I . I , , . . . , . ; . . .� , , * 1. . , I.. I . 11 I I
-1 i ; ."', .: r. I . I , . �, , , "' . . I " � 10 '. ju; I _ "I� 4�- 1 : � , � - .�7 . "_ , , . . .; � I 4. , ., � I - - �. . � I . I 1, . I . . "
, -_ . I . � . . , I
I : � , , , I I . I I I . � " , ": � � � � . I . �� � . : I I . 11 .
I . I . I ,� I r 1 . 11 . 1. � " .. , I. I - , .. , . � .- ,� .1 ?. i ,,�,,� ;:� . I . . . . , . I , � - '. . . � . I . � I .
. 1. . I I . V1 , I � _ !, '. , j . . ; � t.. I 1 I I . I . . � I I . I I . I .
. I . . . I , I � - r I . I I � ": .., I - . 4. �� I . '4 � - , - , I . , � � I I . I I . I . . I
� 1� . � I I , . . - . I , . � . � L � , I , , . I I �� I I
.. I . ,
-
� .� . . I ;I �. 1, � I , . I . . . '.. . � I � I , 1, I % ; �) � , �.� - , "i, , "_ � , L � , I � 'A' . � _io,� , � - , 1, " . . 4 ,: � I I .
I , *��f . . ", � t o. 41 " - - - I , , . I . .., . - - I I I I �
. . .. . I �� , . , t - . � I . f . , I 4 " " I � . I I . 2 I - - I - I I I . . �
- - 1 � � I I I . -, .. .
� � � :e�, � � ��. I � . I I ; I __ l . , � I I . iA � I .11 . 1. f I . . '.. - , I . I . I � L .
, , . I I , , , 7, , j; i4.. -: t . I . � I . . I I . � A . I I
I . . 1: . � . .1 1�. , , . . . .�.-, � ,. . � I I . i - � , " - , . - � �,- 1� I .. . �., I . I . 'i- -,t -,. ; I � I ; ,)I, "i � . ,it, � � . I : I I 1, I � . . . I., I . I � � r I I .. . � . � . I .
" . . t : , ! tf, .. f - � . I t-� . I .'. . . . . - . :. I I . :
I I � ,��,J�, , ,
. i � ! ,,, , ,,, -, 4 " , , . I . I � � � . I � .
. . I I ,o . . 1� I . . . . . .. . � . ,:, . .
, , .. y ,', N4 AR ! � I . � I . , . fl. . 1, . I ;, s . .)l �: I :1 11 . '( ; , ; k?� ` , ,., � ; � I I . . : . . . I.
I . I I "' � - I � , . r ,:i , - I I ..-- %, ,- t : , - ,'!" ' .�:10,�� 402 - - ey ; I 1� , - I.: .�'?
- **-"** " _� I I I �. . . I . I ... �', - � . . I T,; I .1 '. �;" *, .", '' 11 � - .? It. - - .1 . . I �� . . �
I . I . � ... , .; . .". I , . I r � ;, . I 1,� . . . . I . . . I
I I - t�� ,SEN' K" 41 I.,*, . - * , * . !. '� : , , .:, - , , I .?,'. :-. . 1-___� .11 � �. N . . �. i .. . I ., � , *
. ,1, " ., I, I . ,'I , " . 11 . . .-J, 1 , . I � � ,j � .,% . t . � . � " �� I ; -, �
�. . I -_ .. I I - .. it , ." -, .)", -, , �.; .; l., it; . , "', - � � "I I . ,�, . . I . I 11. . � I �.' . 1. I`_ I r : It .I I I - � . I . . 1 .. I, , ,,, .. I � .
.. I it I I - I - ,`� . I- '.. w . I ;wl,�. - , .1 .... I .. i �� t , I I � i , " , , . . , . I I I I I -
I I . . ': �, �' F - , - .-� - � I I ", '� :, � , I . '. , I . . �-
.. I , I 1.11 I ."111 ,� - i � I ! i'4 . I -1 I . " - �
11 � I i 6%, , , - ', . , ,+ I I .. L � I ," ,,� f. r ! ir; , . . ; 4 1 . � . . . I I
�, . ' , � i, "i � �,; . . I ., ;_ - � � X , . . � j I 0, 4 4 . t ' , I � .�f*" - f. . J" . . I I . . I . . . I .- I � L . I I I - I . � ,I I I . .
I , � " . . �'Iv . , I :.", . , . v,, A . : f , . , ;`.' � .. i * . - . , - �'. k + I t .., . I - : . I ", . ,�L , _4 ;) I . I �
I- , , � . I N , , r,; - S; I . 4 - - . I
., , , �: . , p - ,� , , ` �' z �:r. -.��, :j � , " �j I I I. V". . . , I. .. ; ; ; ill I , I �� � l �') .1/ I , I ;4 j- , I : . . , . . . i
'I
.- ; - ln I , � . . v , " �., .i 't . f, . , �' r ' '
� ! �T. ��,.' " 't �. , � , , . 4 I , . I I
I . �, - " - I �, - . it , , . I 0 ""I, - � 11 !�� 4 _ . _111o,.- " I ; 4 I ,,, I " , ,,,, - . . � . I .
, . . . I � L I - . I ., �. , I - I , � ;, I I
, .; I , . . + � I , .. :1 . I 11 .. � : ,_ '. . .. I ,` I �.' , , t A " � " �-. r , � . � .1 !
11) * , ,,, I , '.;,* + j . I I . : 1, . . . . . :. I I
I 'I, . t 1. I I : , , . , , 1. . . 1% . .1 it - 11 "; � , : ... oe . I � I- I . . . I "I . , : Iry .1. z It -.7 � I , ,� . I L, , .
� <_ � I .� �1, I I � - I lk" : ,i� 4 1 � .,� . , , :" , ;, . . I . + . . . . . .` . I I I
� �� , t " ,;. � I . I . . . I ,. � . -i!.? ; I . . � L . .1 . I* ^1 .�I, ... 3 4 I_ I I - - r .1 .. � I I . I , . I .. 1 4 1 . I 1. I , i
� , . . 6 ' i,il. lt�: 7 I.. , .- . , . . I I ! . . 1. . .: +t ...t I - % 1i .
. I .
I , NANHOLE14 - ,.. - . , , � I , ,, i � ,.,ro Y ,4, . �, ; � , , �, . . . .., �', I , . I
. I SE , � . 0-D 0 ''SHEET. 5 "OF 7: . I.— � , "W,�.' .1 1:t - ". Qo'. 1, � , , I I.. , I . . , � i." , _ 6�. �.- l tj _ .. - . . -1 + �% , .
I I I . ; , ,,� � �1. _ " -..-; .��, . . / % _ r ". � , 1::, . . I :,,;:' jl-�,, �_--- I , . : I +. - , . _ .1; I
. , . - I . to I . #2 1 - � I I . :. I � -, . I � � j.,; . . � it. . '' 1 . .l . It' .s � � I �. . 'i I I I . I 1. . v " ,;' '--� - " 4 ".!; ,_:�: ; � 1
- � '600_�"'- � I . . - 1 . - � .1', I .� - I � � I . .� , " � �, . . .1 I . .x , '.1 1. I I . . . I., I .: .
.,42; " I t I I /1. 1, � : ti, I , �: ". i , . . , : : . I . I I.- .. _. . I., .�, I � . I '.. A t . . I I .
. . � . I . . I I
I � 1� I " f, I � � I I � 1: . * , , I . 1. : I � . �, - -.,: '- . , , � , I , .5 ," ll.t: � I I I I I 11 - ., � '. . _ I . I I . , � . . I ; . t .� .; . �. .1 I. I I � �
� � FILEiJ., �, , , �,, , - - , - I I :, , , , 1. I - ..... i4� .- .- , . , I - . i 1, :114'' - j L I �, I 1. , ''. ." . I
. I I., _ ',�.!,,', I �' ", .. . ,; . I .. l.l . . .. , 1. ! . + ,:, .. I I I I ,, It
I I . I . t . I A
I..: . I I t, "..., . I . . . . 't " - .. , �,4,', "."..1. ,�, _ , - I . '.. I. I . .I. . . : . I . � I .. , , " I � 10,
, - ,,, . .- . '7, . . .... . .... : , , . I ,.". I I , I . I I �;. j I . : I ,
.. rI , .... I I, � . .1 � . .
� � l- , I , : . . I . . , , __ � . , '' , , , . .!;, , :,:. ". - . , , 11 I
, ,!. � t .., �,* , I I ..':,j: 1 "!' � I ., -, . 'i �, I I I �. 'i , I
- 11 . � � .I.. !1 " '. � . 1. I -1 I I
,- � � . I . - I .1 !.. - � .. 1;1 .i -1 A-4 �,rf 1: .:." -_�;�j �, ;, . "'. .... I . . " ',�-'"' +. � I
- , ! � . 1. � . - � _ � _,_i I I I � . �, . - - I I �..�,,� J � �. , * - I... . I I � I , . , . I . . I I . .." . i
'5' . . � I . . , lo; . . . " , ,; .biti r , , , I . � -It � ... I � . I 11 . . � ; , � i � . I . '. : I
�, I � - - 1 I "I . . .1 I . _ . 4' - - I . � I I 1. .. . L � � , I 14) ri, , . .� " . . I I I I t I I � .1 . . ,-� I I . ;'� .
. . � � � � - , , ' , - , � � t". . , , 1� , _ - , , Z. - I � ;i �-,,,,!'�! � 11 �. ". I : vi4 . I I � I I " . � :, ,
I 1. . C. I . . �, � T _ I - " .. � . � 4,,� 'i, ____ . ,- r � , - . I .1 . . . 't
, � - , I , - _l .. , I ,`�, , -.I -- - - I - v . I I� . I . 1. . . I .�t
� � ELEV. . = �41 933' L . � . I .-, , , ! I. . I - . I . ; IA 1, - t , ` . .t., -li_ "'. . '--ir 'i , .. I ,:, � - I V � - + . . . ., , ,I
- 11 1. "I 1� , . . , , - ----. -� ' . . . l! �, .. - .; 1, I ; . . I I . I
" 4t . - , - 11--, � o , - . , .. .. L; -ii?.z - ., .: . , , y ,,�, �; , . .�. . --� ,- , �. . .. .1 .t .A + �. . I I , I I
�. I . , ,� . I � ". , ..
., I �'-,14'- . , � . -i". I - , I .. .., ', ,- � " . I . .1 ....4 , I 11 1. . I . . , � ;� .. � .I. '' . , , 1. 'I , " � I , .. .. �, I _, � I �. , , J" , � � At' "I - . 11 ! I I .1 , ' i : I � 4 1, ,,, I I I I . . . � �. � ..�. . I . . . I , ., 1 . I � I . I . ".. I I �. I � I
,
� , r D'o, 1 -tt_io.A'_-_,. . .. � .11 -.t,,_, I .,4 . ]�,14;41, " � il - - , " " �,,,.m. , , , - j I . . .. . . I I I � .i 1.
( '. _,"._�Im-l." . . 7 1, .�� w " -.1 �. ,�j I .,. i,.. - it. .. .40Q�, , ;.. ,, ":r . "'t) i i . "V p "jAr.N�j.*j. , '6. : , L 1-*-'t-I i ,, : , 4 ' � ' �' ' . I � . I
) , I . ._,�; ..A 11, i_ - -._�; '*, . , � �. ; I I .
I ;1� . � . I �. , . � I . _ , , .., 74.4", . -_ - J ..'' lii ,. - ,,, 4�,_ ,,.,.,I - to '0,, : ( . . . " , "t, i, 4 . I .. . . .1 . . . " . . � . . .
'. , - -,=, -14 to - : I __ , I _. ,", . ,�.� . .. . . . , . , , - � I , 1 . . I . I I I
. I .
, ,.. ,N-. .. - � � I � �_) �! " I - . _� " I I ; -. , , � . . . I . . I 1. I 1. . . . I , . . " . � it . , I I � I I
-- 1 4... - � .1 � ill - _'. ��,`Al"A 11.1. ., , , " , . ... , I I . I
. I I . . __1? . � I ;.�. . .",�;�:--,& � . :' 'I W, . 4k,. . . - 1
,�4� 1 :� I , � , ��,i -iNVERT -40&57, - -' ' .., 4 -.1, ., - . � - , t . ._., , �. . . I , " I , .11 : T11 " .;. . ;
I , , . L. ELEV."'I"NlY I .. _'.iil. I - ,I-sr-o"10, it�-7,. 1',,, .. 14�, � � . V . _, .", I—— . k � J�: � I .
i 1�i'111". : ol.. . , , ,� � - ., I - i . I - i, . I -
'. . . � 1: I" I . I I . " , - l,.". ,� � . 1 l,4 -.. ��, ',', I :.. _ . . I I
I .., �. 4 . I , . . I . �. . � . . ". 1 4 t�i, � .� I I �� - ,,,o . �., .T1 " " . 4 I- I ' �k-�'. 4 �,, - w. . .��, . . . ,-, - o . . - . ., . 1 ,. I , � , � ... - 4 , I . I .1 1. .. '. , - . . +1 ., .. " . . . i I � 11 I . - . . . I . . .. . I I 1, I I �. :
. I ( - � 4�3'. ' � I I � ' � " . , : I � .. 4 -, ;. . - I - L .
_ J` I . 1. " . I I � I . . ,,, t � .1 _fl� `�, , � - r - " , :v ", - . I . I I . - . . . V.I.. . .. .. - . . . '. � . I . . . . I
I , , ZJ . � -, , � - I I I I I . " _* I . I 1, ., , � I I - I , I I ,� .I.-, I - � I - I � . . _. �
I .1 ., , , -, . . t , I I . I I : :�: I � 11 � I , " � . , . , �, " , .. , .. . ; ,; � . , , . I .1, 4 1. I I t *. I , ,. "I . A �", ,��" L�." ' '� � . I ..
. '. , r � It. . �. L.I - '. t ., ., I � - .. I I.. - - � I I . I I � f 11 I .1 . it ;
, ', . � - . I I .1; � ;, � I . I , : 111 I � t ,, , ,, . , . - :. . I . .
4 - � - . - - ?I .. 1. � . . I I I . . I . I � . .1 I . . . , . � . + � . -
" 1�'. � I I . . , ' ' . :' t .. j, �' 'I", L � ! . � 1 I . I I 1� I t
'I - , , ; ELEV. �� S LY INVERT'=' 4O8.A7 1 - . ;I ; \_ . I . : . ; "': P� :, - I 'i" _1 L .jlilf�, 1. "k, I 1 .. ; 11 . � - � . ..,-. - - "... " ,,, I % ;. , , 141. , .
I-: � I � . . 1. . I .. ." .. I— I . I I 'R), L I
I , , 11i.�. .., . . I I. . -_ 11� -_ .. I. ' � " , t I
I , , , j .'� � � I : � �, I ! � I � I , . ". , ".". r " t�, .1 I I .
,
- I � f " it, �*.j . . � Jl A . 1 ?, � , - � , ." � . � , : L I ' .,. � , I , % "; :.� � � 4, .."�`. . :. .. . � _." I � L-,., ! I , ! , " , _. 4- ., � P , I . � .i . . ,�� .i � '. . I . I " , I I . I . � I - . 1. . __v w I— , ;!* : J�
. .1., I . I 1�.. p I I : .
. , � I .� - . , . _ � 1, I . . I I . � � .
" .� I "I . . ,�, ,� , � ., , , I . : , I .��, - 1, I .11 I , . . ; . �, , I it �� f-;:i,,,!, :, , , . I . , �` , , , . I , ". . . . , , I I . t , �
, t"! � 7 . . � 1. . �.& 'H, GU. � R *%, 0* "
, 1. : . I ,.I-.. . I.- - -- - - - ...,- _ _.-I.... _ - , _L . I
f i 11�1 .i' . . � " : � I , . I I- . �� ;. I I" ) . - , .1 i.. 1, , , + . . . p, ... 1 , - , . . V . �. AL ---:
. . I
I 1) I �,!' - � I , .� . . ' 4- ' - I . , I . 1. I .11, - . 11 .. :0'. , ... , � .- . . ; : . � r . _. , � . I + . - '. " , . , � . _0 . , . ;. . . . . , I . - . � I
I - I I . I .1 I , . . F ,c
I I ., � I I ; , , - I . . I . . . . . '. . .. i . . . I . 1; I �:, , * " I . �
I f � �, �t - . _� , I , . ., � -. -, t'� , � � I . � r - � ".. - , - -- - .. . - . . . ,4 � t j . I ; t , , .
I .�;� . . . � , . . , 1. .. I - �. �' + , ,� , : _ , - 'r ., - ,- _1; � i' , �. I . I . _ ! 1) , . , ., I , � � 't I .1 . .. i . . � I 'A I . �i ... � I I
I I . . , . .1 , . , rp - -- . i 11. . �. I it . I I . . � I I 1.
I . I , ,. I I I l, � _. I I lw , , .I , - rr,! *,0 . " I . I . -. I I I I . . I � . I � ;
. . � � :., �. . - I. . . I I : , , I �
1�� -.1. ,. _ I . � - , - I . . . . � . . . . I 1; . IV - . I I - I . I .
- . 1 . I I ,� 1i: . " "., : ,, , I I I i . . , I I & I , .1 I !I L' " . I � .
. - � I I , I , I ." : � � 1: I �� 7 j , , .1 , � I . I � I - I . l '. 11 7 .. j, , I 4; - _.. "ie - � � I � , I .
. _,� -',',:,' �, * "::z - " I I �;; _ , I I , I I - , vi�q - , .)
� . � . � � . I .i , , . � I I . I I+- 11 ..._ � . . I - I I .. 1 4, � - , I . . _ � � I � � � .. , � �, ,, t, , .1 , ,�, I �_' : , , t , i �
, I _. � - I , .: . , . , I . .. r, � % L � ; .� I , I . I I '' .
I - , . � , .1, . 1� I I , :_ : � .:, - I . �i . , ,4) � " j�.. � , � , `,i, � , . I., W , _ � ., , 4 . , I , . .1 t F _,� . '_ , , , � � - '� . � I . . . - I - - - . , , J,
I , ,,,. ��: , " t - �. -, 1. ..,� -, ,�.. _. �,� � , "; � � . � . 1�.' �, . � " � ..� � � ". '. � '. 1. , - . I I it ! , I ',! �. ii;',, .,I � r , ' , , , , I' , - , * , , ` , - I I , I
, , , � . , - I . . . i . I . * r" rl".1 -: I . ,, � , 0; it I =1 - - I. - I - � . 1. I . , I .. . � ., ;, � � I I il + I I .
, , I . v , . , , - , i�, -� . , I . . . , �
- � , 1�'. "' I � - I 11� 11 '.1 1.11 , I . I � _ � 1. �, I I I I � I , �, . I - , , rW . .. 11. . - .
. I I 'i f, f� ,� , _ � � (", , ".1 , ,,il . I . I : I . � - i� . I . I .: ,,- �,�J,', 't-,- � - h ',. � -. - .. - � - ... I. I . � I . .1 I �
io-" ,� .4 "I, , I ",:. ,f� ," I . ". .1 L . "" . I . I I . 11 i
I I I + I �-. c. v , I � . . - . 1. I �, . " - - , - , , " . I I l- - 1 � , ,. I I . . . I I I 1. I I .�
I - ,if .,(#, 1��_ 1. , I . I . 1 . �t I . p I . . . . � . I . % I . .. . . . �
I � . i , 1. �:, � .", I . -1 � it , 1;, ,, . .". ". - I " ' - . '- 1 3+50' * 1 i I , i 1
- IbN,56 ill, +` , , �. �i_ ". � ' -
I �
I I I -1 '��."_.;.�W, . - ". i':�,,,'�,� , . I - !: - - , f, * " " � I , .
� ,�':_ 1, " 1. : , - if -;l
I , , , , I I , - - "' - , - '� "I ", 't ',�:t
. .. I " , I I 11 , " , I ': .. ir , � . � , - 7 il, ,-4 ,,,, � , , , !0, f, t, 1 ! , , , ; - -
� spz . . I I v , ", I . . . I I 1. '. - �,r. k � -, . I - - llo ,,, � ,:l,:* , '. 4;� 1 4
, , � . � e� I" � . I I . . .1 I I -I. % , , � . " - I.. . . , I - I r � I � t . fr. I . . I � . L. � . . . I ! � . . � - ;
,." 4,1�1 �, " I ,0. , " . -1 - " , - .-1 .. 11 � - , I. : � . I +v I �� .,I - , , , 'T .. I I � �,�'.�,' il i . . I I I . '.
� ; , I I '. I . . . .. .. . � . ,� I . �. !
,
.
, I v, "i . , . I . . -; 11 ,� . ,Q+bd,i-+z- f ,,; 1 -� v - ", , 1, - �.l - I r It, l I., 1+60 . � +0. � � 2+50A . .
. -� I . �r!;i I Itl-,�-I..., , . ,,,,,, - W�,-,;;i 1:1�. �., .. .tit! ,,, . X " - ,
. -, I , � I . � _t � . -, 98:, ..� , . 7�7, ,c ', ,' ' - 'i�, %
I , � .. -1 . BEFO
. � �. "ii'd .it 1! .:, :, . I -, . . I L, I 1 ._.1j-o_,4. ` "r" "' + , -.:,,; �, 3 ,:V, , ,,,,R,,E YOU ". DIG'' '
'
I � . � , 'iL , .. 1:7 ". 1111" J.,,pali,ir � I .., -, � . .1. ''I + ":! +QQ j '2 -0� I' . ;
, L .. -.1.
. . - , " - , ;!;;� � . .,; - I. I � . . 11 ,.�. I . A . �� ,I
I '. - 1 I I I I 1� r ,�., � 4" . 'I.I: , ,L , , I ; ' " I ` ., I � 4 � ;1 . . - . I I . I . I . I � I
'
*
" "
' I " "' ' " I ", , " 7-7 - �
L
I
�
I
.
I
r
)
i
L
i
I
,
.1 I
'I
Iq Iii, ,
,
.t,, IN
I \
I 71�,w I L"' '_1 L12
lt^v,�. . I
,
� L
� :Q�l
I
- I
,
1. Y
I
.. ,
L�-�____4_
) I- 2 6, S; � �L�� � ���-4 __A4,
. -
L-� :
= ,
. ,"', , !'" I. 11 I �`_ "I I
x =
. 4 = =: = - �_.' � �"_ "
�
I
a" -1 � . -
I �
I � ! 4 ' K �_ � � __ - I " I ' , , "' I.
,
I
- -
.."
, ' , I
,
" ! '-" "' " " ' - " ,
' " ' ' ' ' I I I
't ".-i - - - I
.' . � ` -� - �
' ' .1 ` - - - I �
��PE 11 �JB
I �, � "__ . , , ...'.1. . . I I . , , -,. " t, " I I � .1.," ,, L_ ', , l,i _ , I . I I.. -r,& monoli . . !
;r: . I k..; �:t, y , . I �. . .
I I .1 . I ..�.. I I , 11 . _ . I � . - I . l.,., - I. " it . A , . ��,, ". I _i i , I . . _ w ; . I f I I -
: , 1.'.hl - ' .. 1 11 - I I , %, ".., 'i 1. ? � �. ., , . . I I -1 i 11, I I � 1-1, . �.+�- : � , -_ � .
I _�. , I I I F L 11. -, li� - I +__ , i . _ I I - I . - I w I .' I - � " " � I e , �1 � i'- " - �,,� , .t',*, � 1 4 1� ,� i . , I I 1- , . . e. . ". .i,, , I �i " � I . . I . .1 . I - . :, . I . 1�1 , . 1 '' ,r I . - - . Ili
I . . . I I .� - � � :.1 'i.*'v , " , I ". - I . L t '. - . I . I I ; ; " : I r - . 10" ''. : 11 *1 I , . . A , - 11. ,,, � � - ., -1, , . � . j . w I , I 11 � I .
. I ��, .� . . .. . I . . , , - . I I .
I , ` I . . I , 1 0 � 1� r � , ,�. ,
I � 'r , _', ' . . , . I t , . "I I "t It j=.'-,' i� " "' , , . 4 I ,. I
, "it � � � . I . , .. , � I, .1 � ' ' 11 I - I. I I
I I e I, .�, � " ,: " .'..� , , � , . I , : 1, I . ..; - -t- .1 � I , , = I .1 I I I : . , 1, _ ... � . �.-,,. , I
- I 11 � . . I . � . I . I, i. . , . I I ; I - � . . I . 1. ,, , " � , I . . , , . � . . I - I : I 1, e� I I .
- ': , . _ �p 1" I . . � - . ��. I . I I .i . , :1 , I �.� � i , ". f I I . 7 - . , -so � . . . . I 1, . _1� 1* I'll - :;
'. , , I ' 'i I"- . I , I � i ..
, ,.I t *!,;i'-- - - . " , I _., - I I . I . I it , ". ,� , t . I . I I . I I I � . . I , " � -y 1�,- L.. ; ' kt-:'I�Ai, -20? V: 17 2"
ilt .- I r, " , � : . ''.;,.._', �, 1.� I : �, .: !��' � - t, , '' - .:: '.,,.*', "", ,"I,. ; � "I . , ': , I '' _; I ".1 '. I , , -, 4 I 11 I 'i t'. , , " " "V 1'. � ��.: �-- . I � , . .
� I . , I 9, I , : I - + _ _ . . I ., k , �, � t , . � * . I ,�� , . I I.. I � I I . . . � I . . . I I , . I I - ��
. � , t . , , ''� , , .. I \` , : :,, ,f �'. - - . .1 I . I I . - I .,..- . .:,_,',�, I . I . " i .. 1� I I., I ,. !, ��;ot � I . . "' ' - i' ' " " '_� �;�`�: 0, " R" 1p, 'I v . . 41
I -Ij I " � I I ''%:r - � " ,,�, �� '' , I . - �, " - :!"4�1' " ,� . , _ , 1. � I I : I.. �. Ik� �4( j - , I I . , I... 55� ,. . �
,; :�
1, . - - �1, . I �� I . I I I I I . � i . i. 61 ". � i I I I - � .rl . I . . . � .
,,�'lj_ t" -, ,,, I '. �. I �,',.., ' ;', . �, : ,A � L, -.'It� . � � -..,A I ,� , c , j r
�_ ... , , � �, ..., , , , . . . I ' ��'�' 'I i.
I - . �; , '; ��;4, �,,_ 4, ;� I ll' I- .
I
, I ." �,r* , r, , . 'i� ., . -1 . , I '.:I, �. ". I " �., _t, . � . � " � !.* -� .. � . . .�+ : ,,,,. ", .. 1 � - ,,I ,4,- l-F _A , , I I ") 4 I I. 5 .5
,,, ,� + : , _'. 1. I . , . I I .. I : � , ; :; � . :*-,�fi, . � I ". ; : "F, 1, t �-, i,,�4 . I � I : , I I - . �
� - __ _ . , - . ... � , , � A . . 4 .,"�14,�1,4,, .
, ,i;___', ,
I . 11 . ,� �.. .,� � , . 1� '' � I I � -1. � . .:� � �% . I ,' � . , � , � I 1. ..� , I ., It .. "I .,. . � -I., ., .. . . . . I . � - ,
I I . : -,, I.., I.) " ,,11 . I .1, � ! 1 -48-00.r�- I
,
,
� . . , . .
�
� � . ".S r ,._v1_.. !I(.. �... I I t... 1� , I'll "'.. � I I I . . 11 , 1. 11 I I I.S."", I . , . �; V41 ,.,.;. . - ,._!..�:ii ..!,.Jl�_-� ;.., , .. il.- - " � \ ��"W .
' I I '. I—-, I ..,.. , �j .", . 'Z , 1. i, � 0 �
I I 1* - , �4 � " I I., . I" ! 11 � 7 N'0),'Wwtl�-, I', -., I 0" ''I I I i . _.__ � � �,
- L* � I t -. , '' . L , 1. " ��, I .1,11, I � I.. I r I . I � ...� . 1. �
. .. _.�. " _ - -.- ,l-;:;, ,1-' ,,, 1, I I � I � ,,t.� '. ,; I., I I 11 - - I o I � 1�
� " 1, , - _ �"'. . .1 , :.- �:.;.* � i. - , t - ...- I , � 1 . �
+ 11' : I 2 , .0r,
� - . �,Z, �1�1 I I , I, I " . , L 4 1 . . _,�� � ",
� I I I � , , , . , . : .. it , I - ;1 ,� ,�; 'i �' �': , �� , -,, -- 4 . � , i * I , , I I 11 . . I � � ;!1I " I f I �e, '.
I I ,./T' I . " _ . I . � I , 4, , , . - v ''
, I -_ ____ -_ I . . I . �,,, ,L1, - I i " , .- I - I . I � 1.1 'I. "I'll "I � 1� . .1 I I I Z - - _� I � . �
I , , �,�,' , I - - I " . L 1, � I . . . r � , �. . !_ � , * , - � i I I'll, mll,iiom� " -
; , . .. 'l I I , . I I I . `o"�Iiii I .
- I - I ` .......... . . I- i I . I . . ,v 7 � I
, � , I I ; I " I , , � - i � , , I * � I I I . .10 "'i �! ! ,,,�� , t" � :_ I � I I � I . ; . - . p ; :
I I . � 'k.", I 1, - 11; � I , , , . - . , . - , � 1. I I 1, , , " � � i��. t -#i " � ? q . ;.,j,r" � I , i . ,
" , ., .;" , . , , , � , , , , . , i , ; F , �l " l, " , , � � I 11 I I � . ),I " - I -�
* �� , , I .1i I. - ,iz i.
'' , . 17' . � I . I I �, I -, 11� I � F, - I " , I I- I � "I , , I " � I ,� 1, I . I , i - ;,. � .; 1 1 J, 1,1 , .J. .� I, I I . . � I i:�j j, t4" : '. I L. I � . I I I , ,. I + . 11 ! I + . I . I . � . . I
� ,,`� . I , " 'r ill 17 , ; I ohmm"m , .1 I - ,'I: 1. !., , � . -�% � I I , " I . 11 I I . I I
� . . , 6 to , 0 " low - . - , " - . � , . - I , ; � I .1. � I � " I 1. 1. ." - , - . '. � 11.11-1
I _ I I I - I I . I I � - � - ., . , "! - , I , �. + - _ I . ?� 'i 1,'�i,' � �: 'l 'i, � t!: ,� . i. . - .. . I , . I � . . . .
, , , � ,,, � ."i '. � - , , �m �, , � 'i I I It .- ; " ,; � �, ! i i i- i. ,
I I � ,_ , 'i � � p 1. - 4 . ., �, ! - w ,, , - . I t , It, 'I ! ! . ,
. 1, � " I I . . I � I .,. , , I . - I— I " - . , . I 1. '� 1111� -, , '. ." I I.. � � I I . '.. 'I- -A� ", , ,,� y` � :1 � - -� .'' I I ; . , ... - . I , , I - . I . . - -il � ." , , , - . I , I . . !, 7 ': �
I " . �. : I I" I I .'_ , , , I - . I I . , I , ( I . 1?� - - � ,� , .1. 4� . . - ,e - .. ". L, : I I � I . . I .. , . : L . ,,, . , . , , , I
-1 I .1 � .11 � . I � I � . I I I I l � . I I I . � , I . I I I ., . ", I - I T v, 7 .,� �, I 1. ,, e I :I . I I I I � I I
-- Z
I � ,;i� I
l ; i , I (:�'N
. I ""
. . , I . 11:� ,
I I 4'.' ).C4
L � , "ir,
- I..
I , :; tjr�_,,
11 - Lj
.4,i,
.
� .", - -
'I _�
'i � �
l. i v
.
I I . i 1�,;,
. . �, � C">
. � 1, "i C15
", , �i
I * ,I �,6
f ; W
,.,��
*
I .
'.I
; * ) 1,
,, , I ,& I.
1,
N 6i i
;, , , & 'it �
, �
.. .. I I 11 .I- -*
I " ,
l .
�, I I l, r,
I �
"', D ATE `
I . I I I , I - I ��
. I I
", ' L I
, ""' I ., � � , , �
I I
i., , .
T,�',,
I . - . I L I . I l I - . I � i I
, I -1 4 �
I I , I I - . . , . I " . I - �_ � - I Ic p , I . : - ,..�,�' y ..,n� " .� I ,
- . �
- -�, I , - I '! 41 ". . I I I , t . � , , � : :1 ,
. . ". 1 ,
�, � "% I
I � - '. - , � ,.� . . . 11;,,;, ,I' � I I . , � ,
S
RE -10N`DE, " ITION, '' .- '"
�
. ��
�*, .."
�-,,-it-R .
,_ .� ,,
, ,
, ii-
.1 I .V'!,�� '. I I . ,, - 'it, . - t 1, � �;,
t,,,�- I I , , ,VIS -,
- ''4.1 � I
I 11
i0000`ooi00000
I I
I
- �- -I- (7-
I I !. , !
1.� -
.� s
,-, .. , . "I �
,
�,� "
11-1-1
� , � *, , � I ", t - -+ , ". -
� " �11 I
� �,
I " C,� �,. .,7.`-.
_� j ,� ", , , "� jl�,",L, , . 1, tt � . I I it `-��' , . ,-t,.�1,1,i,�,;,I.q�,'���,.7'.1. ir 1.
-t .,:-, � � � ,
11. �. '. i,� k � � I � - - � . . .
, CEN MON 'EY " � �. .
T 4E."SURV
,,, ,
. 1 7,
- I � �,
iIl "s 12/19/97 ��
:** %" " ,j"', t.
I r ''," ' � -� - ,,,.- ,, , I 1. . I
, , - , I � 4 - _'�`�,_'� 1.11 -to
I 1, 1 'i
:1 ,, � I
I . I I .
,
�' I
" " 12/15/97 ' � "
"
. I
. � I "
I � � I - . �
,
- . NI- 1. j, - . .
I., , I 11 I., � . � I . , N", I
I � . . , �. � � , � I + I
, ,
r '. � � � , . � + ( 1 ';,%
: � , I" -
, . I � I ,
, CITY. -.' �` - -'
� ,
1.11 I
1�1
L
" t
1. � . ,
I., I ! �
. , . .COMMENTS + � _. I., I
, I 11. I I � � ,
� to
I . ,
� 1, -� il
_ �
. I � .
I '
`
4k, ' '4-
" " _',
7--
I "----
. . ,I
.
I ' �
�,�*,�",,; I '���'
�
� . .�, 4 I 1. ,'�L ", . . 't "� , I 17
, . - . . , _ - +
- - , I I - I . _�;L,y, - ^ ,
, _1 . , : I I � I I ; ".11,
lil
-,t, _ ;
" - l�. -.1 . I - . , - ,.-
� ` y
� 4
oi o;, )11
,Ab,/28/0��,� ,
7
." i I
I ,
_ 11
_ . � -,ti..��,� . , ; 11 , it
, I -
" , � I "tcIT ",cOM4EN1T$'1. ,: - ", I
"
- 1.
. ,�
I ,
: ..,
I
., I .1
I - ,
-
-1 I ,;
- I
I , ,�
�
I , . .
l . I , , , - I
" �i , ., I L �
�, , , . ,
,
�� i_ I,!,
. J,,
_ I � � t
"r . I , t I
I .
� I ,
- 1� '. , . I
, � � o...L�
. '.
11 I It-
*, -.-, � -.0 I -1 -1
11 � o . 11 I , , �4 t,f ,�, , .., . � , - I � � , - I .,I , t � I I . , t, I
L , , . ""' "' '�' ' � I - ' . - , , � t -�*. -� -,.., I., �
, , , , , '. I I , .- , - " - ,.
, , - I � _. . . � 1 1,
, . al - .. 1. .(11 i I .
: ,�,_ � , �, 1, 1-1. � . �;�.� .. FERMIT't0b, TTA4., _: � ". . I . I
, - . I I
� , ., � I 1. I "'� I ,
I , - I -
��M�_@ t� m� I, " I � � �, 1. i' I 11. I I
I . I ,,� I , _"
I - � I " I I I I I . � I , � I I . ... I .-I 1.t . I . . � . . I � �. . . .. . . . I .
N t� .. , _ � . I 1"' 4t,&, . t ., , I "'i - I � ,;t"�- �.:� ,,it, , . . I I.. . . , 1. I " . I . . I . .
. � . . � � � .
�, 4 , �, 1 7� 1 " - �_ , 11 . . I I
I tv ., I , I '' ss . it"_:. . . I 1. . -, I * . il : . I I I �. " , + ", . , I . � . : � !�
� � � , L� f i;, I (� i. :,.'44 4 14 0 .,i , ,,- " , ., . ., � , � . .., 0 ., . . I :, � . ''; . .1
1 - - 'su'ri. -, , Tri I I r.� "'. I P �t' - , ' L I ., +1 , . ,_ � � I I I � I ; ... ; , . . I �. . % '. - 1. . . . ".1 I
I ,
- DES10- ID *BY.. " 4s p I L-1:lo .. I, "; " � " i. `,� , ,t� "r _0 � ,� b - I I f , �,;- ,,,-, ��i` i I 1. . I I I . . I I . . . I : I �
I -I- �� 1'''. �41 '., � 1'e�., K ' ' . d I I , � 1. r. �,� .L ", , . � ,
, .1 11 k ...i � "fl, � ,..", I . I . ' . I I ' . . I.L
I
I .. . I—., _. ... , k,. � -,A� ,,, it, I" I ..'' . ,,,�. I .1 , lt,� ." � .. , ' 1"L+"i', i,.l I ,i. I!
I I 1:��, l ;. I "�f�, i.-,_ -I I - I . ,�.'_., , I . :, � .1
'10A 0% ,., - , .,,.;, . '' I , I * " . I _. .
I . .ir �1, I � ;L I - I , . .1. I - 4: . , !+,
1�'. " q I _i ,,, I I �
-_ Q . . _,, � .. , . I I :. , '� . - ..,;,I, � � `tx. 1! � I 1, , I
I . 1. 1.4 1 " " I " " � I -4 It- ",I . t . , � A I, � i I . L. I * * . 1 ! . � . 'A
, ! . - -
11, I .
� iw&lm `11_1� + :it
OT.'�V , - I v . :L mmu�n ,v"W�N , . I ' -, , '' " 'C', . , , " I� . 1w, I I 11 t ". '.
# I . , 4, 1 . I I . I -,--.. __ ___ . . . - , 'i '. I .
1 I ��, , ", I . . I L :L, .- . - . I.. . , I 1;1 I . ! I � , . I
_. 11 1. . � I . 1. , , � .,� � I I I.- I .. I � �
i .� . I it - ? - .! I ".. , , , _, i .".. � � i � j. ,� . i.. I I I:,.. . . + . I 1. ; I
I I � . I . I I '.1 I � I I I . ., � � i I I I - , . . . I I I.i
I . .1 : ., . r_ �� 111. OIL - '4 L , , �l . I �;,: ii � �. '. I - . . I . + � - I .. I : . 1. . i ! 'I.: I I �
! I . . I . I 11 I . - . , � ': �,,�,- -� ,,� -, % V - ,�,, " ., . . I I . � ��, , - . . . .. . I I . � . I :, . I., 1. . . .
�
1, , 1i . � � � 33 A e" i I ''I i";; - - � �, . .,t;� o� �j � �w% ,%.. _ � 1.']". 1, .-, 1"""', ;. . . . I - 1, . . . I I
, t .. I , 01 t*, ,�WA i - , . 1, V .1 ,, : 1 ,4 "'', - W. . +,. . �., "I . I I I � . I �. I
. . , : ,S�m - I . I I.. t. : .. ,,,i,:t',' , 7,. � m"10N* FLAN" `._ " '�';' , �, . 4
I . . ,.,.,.-.., , � .. "I. .. . 1_ ' N T"' " - '
. � 4��. .. I ''. . ...'
- - I I .. I I '. .& ", �.._. ' M-0 ArEn I , I 44 " : . ' ' I . , 1 ,:16 TOR " AG I =1 ,� � R -
I , I . 0 'e''.14i ---,* �.�, - I .''.1"..'' - NBERAY, ... Ak 1E � I
, W -hin. t
� - � wl� ,..,-'.1* __ kjl� , .� IT'llU Rr, �t IN ,, , 1 Ci,,, I , �� , � N
" i , 1* ",9 , -
, ", 1. , �,� ,
�
,
, �,Pl n ;_;_ , 11 � " L _. '. I " , 'E -W.'.
I . , I r*- " p it 4 O% ,,, WMI 11' - �' 72ND L A,V �Wj"t,
,,�,;�,. "m UMS
. ,
,
. I
, ,
m, , 1. � -*&-, 7,i. '' + .. I I . ' - , .
144 . . I ii, L, 4;1.1111�:,+ 6. ii... 1, ..�_�I . , ...,.,." .�.- " - .
?.
BY-l" . _,,m 9. , , �,i�,;,,:�,,.�� 1. ,I .,,..,� ,,:,,1m:'Dr`
.1 l.- , .1 - r� . I I—. . �'..., . IN
...1.;;I- . .. '';.-.L,. 11. . .1 I
I I I Vt? 11, 1. . - 1 i;,, I himm ..:I. . " . il"., ��,.,.. � � ��" . ,� i�;
�'. I : I � , ' I ' , * - 0700- :1. ... . ii'�; ,,_. 4 I - , .. .. . . , , ': - � -�j , I - , *;;_,' * � I
, -, . I - . -1 'A" '' -563 � o, � ,,�- i_'..:..'1_t (z ; - ,% . - I -
I , ,5, %,Kr � jv, : I � � - 'A'-Qadmm tilk",--it'.." _� -, ... � ,� ... , � "". it ,,, , ,
iii-� L �. � ^ '.. � �. _.. , ,
.
i ,,it', �,_ I .. L " - F711 N - - �, . I I , , ., .,t,, .' ,
.
, - y "" ' '.- WE' L.'' 1 . � ;, 1". . 0 "11 N I "' - - " - .c
_DRA M. : . 1� l.'� I - ,
,
_'V. Y.. - � , w , 'I", D - w - GTO' � , :
� , 81`__�__ 1. ---'-'. i TR * I- % _11-ossy , , r, ,.. - _. " _ � , � ,
XED I , , : � - ._�'�l � . . - "'... V�l .. , I ..,. . f %�)1_,.,,i'4-.(:'"_ 1, ,,,�l-. -EX, ,',,,E . . , . I �
11:. .� .11 . I I I .. � . � .
,,. - CH'EQ -p Y�-' : I . i. . ., .. . I I r _,.;f. "; . �V , I I 1) " .1 .. 1. I "I . " :� ,-.,"I . . ,., ,:"+"* - 1 + � I . I . .11 ;. " �, . . I . ": . I ..''. �. . �
I "�_9 - ..", j oi,', ;. :, *-"",.;, � I I ,- 11 . ,� , " 11 I I ', 11 I'll I . I ''. I 11 I I . I - L . I . . 1. . .11, " . ... .� I I
I I - I. 1. 1. 1. w I . . I � . I � " " - a , I , I I . �
. . . , , � 'k I . ,, � . i, , - . '", � , , . - I I it I I .� - ., f..; -I. 1� I . . I 1i �. .1� � I . I" �.
; ,�, "I, ' 111 ., ///]I , ,,,,, ,l!. I I il , 0"t:*,Z!fA&-C� E5, :,,' . ': � 11 i � ", A . , , : * - : I., I "". , � � . . I i � , � , I . A . - � . . . : � . - -
; IL . I � ,,�,�. I, . , . �) E I.' . � W, . I ". 'i, - . - . 1, -, It ,. 1 �t . . . � .; 1. � ' 'Ll . " 11 ; 1 ,
: I I I ��.'�,, -_ - _` I I 1:�l , "_., �r ,., -1 .. 1 4�11(2.01001.464� Mil..J..�,J�j� " A ,� � I � _-, 1 . I �.' e - - ,
� . . 1. I'A� '. I 1, �'11'1.1) .1 ,rl �_ t.�, :2 - � - z L ,,, I � - . � ;*,
, � I AJI - � � .1 - I ...
I - 0";4- ... , I 1. 11 I
L � . . � .- . "I ', ,.t".,.� �. � I . I - �, 1, - I � I ., I
. I I " � . � . � . - .� .1'r-, '�,._, ,_-,,1_ . -, i� " I . �l , � 1, I � ,i ,4.,�11_41'_., �, -41, t 4,�� ` - - I % , , 11 I � . , " I ; I . "i � I It I . �� . i , 11 � . . .- � 7:. 1
iv lt, �* -i- - , , I : '.' : I I - - . . - . " I I kl! , '' "'t, '', , , : . I I , ,� , . , ,,_ I I I � I � - :� I .1 � � . . . I , , � . I � . . , .1 I .1 , I
ll ; I I � . . � -� . 1, T-lo , . . . " I ,, .. !,; --, , , I . I., , � � -.. ) , , . , i -i , , iio�,i, -, r ., . + I
I I . � � �,,� . " I I 11 . I I 1, � �, I . I , � -, : � . -'. , - . I � I .. �.. � .", . ._ t i I . , i I , t I � . I -�4 i. j � L . I I . I � �� ill " ,' .. , , I ,.:.,, , ', &f,' .. � . it .. I -t ii� ,, � �,, , . . . -,z � I , " " Ill. � .. r . I I � . I � , - , � , , � _ � 7 I . , . I I
I J_,� t , , I � . , I , I , . , i I , , f" : � , " I ; , ;, , � , ;I I ,., � . � t I ,,, , , 0 1 ; � I , I � I - "'. I,.,, � , � ,'..� - , . ,!-.;I:�Y�., 'v ,,, � " "�' . . �,, � - ; �
. - , , I , I - ,� 'A � ' I 't'. I .." !. 11 _,;�, J� .. _ 1. �,( et -,':;_,� I I 11 f,,� - ., - - i , - - .... . . .. '... , I . - .1 - �. - - _ � .. , ". ;,: . _: , It", , . ,� , .. � .1 .. 1, I , " I
I .
I
I � I 1: , - � -- � � " I . .i i ; �. ! . ; i'l, .: , ,z '? ,I'. " " i , " .5 * , , 1_ 11 " .
.
- '4� - - I " ,I I i� ; �,J' ._�, � Ili. -,�: , � ;-�4 -:, " � , I I I V. .. , ,." , ': � " ; . .V.l � , , . - . . � .- -1. - .- , _ . : , -1 " . y-,, �, .� � ,� � l. - k �,,: I V,,,� .., � , , '_tl - ".1 . .. - I . ! - � .
, , , , , � " - ,
, , . . . . .1 I I � , � -, . , .1 .: ,, � , � ,.' 1, � .1 '.l'�,� � . . , .. - , � ti"; � i f, � z I 11 ! ... I �. ... , j o: � 4 . .
11 " , . , � I I I 1. , , , . 11 1 ' ' 1 ., 1. I �! 1, 1-:1 _ ,t... , I , , - , .,,� 1 4., .. '. � , , . F) . , i16 ; r, I
� , 'r .. i - , 1, � " :, " --'� �o, i �,A � I , , ., r , tj �� - �- t", . -1
� � . � , __ ,
� , I ,:, ,�'� ,;, , , , �, ,. ". �, ... I , , , ,r ,- to , I ! I ,E�� RS9 7171 ,I 1. " i,,:� "' 'I*,.,,
, . . ,� �, . � I , , , ", � " Y ; , f I 11 .- -- i� I , � � . - , - 1. I � I , . . �
. . " .� I � � I t _ ,,A�,-', :-,--�-�,;i, , - j, - 1!�, , I , I � 1� - ". I , - I . .1, . A .1 - , ", 11
I I � I I . I I I . �i " I "I , ", .. . I . . �i, 4, t t� � I , ti� . , - - , , '1,4i. . "i ., . _._'J'i"�_-,:":�:d� -.- - _x - . . . I : . - I I '. 1 u, . . . _ I I
- ;'' � * 1, , - ., .�":_,. ; .'��,!� ,�Ay. -, " ,it� -,� .,. " �, I 11 .
I I - I .. � � � , I , , I . - , '. - . I � . I . I .. ,,,,
7 ��7 77 to-4
tt5LF 6.
VON-,
Blimp
F I#415.87
oto
'A.
IF RO Fi
S H
S
419.7
_x RIM
'6" SS
I 45LF 8, S a, -
5 P
itTP N TR Y
Al
E
'BU
,
1LD111 10%
Lb N
4. 4
20
`$CAL
oo
422
41 8
416
41 4
.4.1 2
'410
_40
7
ui uj
4
C*4 0:� In c/)
cz . w C%4 C14. C%4 9�
�P)I 40 1 1 1 Do 04 C14
—00 c)
Lo I , 11
< C14 + Ln
;7- -t P �j
c
c%4 14-
:0
R
L
LLJ
4 44 18,11
uj
4 , W CL ui
CIO
cow v) cow in BE LLJ W
c/) %-"Q:
Uj
422
422
420
420
16
PROPOSED GR kD
GR ADE"
Wall tOF OM E�\
milk
M 8 IT i ft% 0, 1 1
418
T
Now
6'
416 41 6L.
61
6"
S�
75
0
6 T
0(y
SS @2
070
2. '*4AU=* Nola'
2.
414 'ITO; CMAM
414
'Ili CONTRACTOR IS" SPECIFIC ALLY CAUTIONED THAT
E
..,�THE, LOCATION I�
AND/OR, ELEVATION OF THE, EXISTING
UTILITIES AS 'SHOWN ON, TH PLANS IS BASED ON
�ESE
THE RECORDS, OF'
UTILITY COMPANIES AND'
VARIOUS
412 -W
ir 412 HERE POSSIBLE, MEASUREMENTS, TAKEN' IN
-THE INFORMATION, IS NOT TOBE.RELIED ON AS BEING
X - E T, OR COMOLETE, THE� CONTRACTOR.�'
AC WUST CALL
-UTILITY- COMPANY, AT, LEAST, -48 AS
-APP ROPRIATE
'EXACT FIELD
BEFORE, ANY.. EXCAVATION TO REQUEST
'424-�5555 IT SHALL BE THE'
'AW
410 LOCATION Of UTIUTIES. 1-800—
BILITY OF' 'ALL
RESPOkSI* THEICONTRACTORTO RELOCATE
44
401 EMSTING, UTILITIES., WHICH,, CO"CT WTH THE PROPOSE6
A
)MOROVEMENTS'SHO0 ON'JH�SF MIANS.
n
A 2
Wo
%
+
H UR
'CALL .48 f0'
30+00. 30+50
iZ
4 1 1 + 00 11 +50 1 20 20+50
E
B FO RE YOU D I
It
;k
J
P ROFILE C
OF , 1 Lq �ei, P G
P! R LE� B
24 5555
-1--800-4
S 'N
ARY
A CAU11ON
ik
.1 4 COORDINATE W TH PUGET SOUND ENERGY SER \4 CES;`
THE CONTRACTOR SHALL''
ALE
77
G
IRK, IN TH ARE �F, T�E:: USTIN 12 VN, E IN ?2.ND AVENUE W.
:A
'j
`1 t t
0 0
0
N
, ,Mmi ) a I t I A
1; A
494
t V>
k, Z.
A, 1 ; , 77
lit.
V)
La
F�-
1 0;
3:
c 4
�
,;E uj +
0 0::
F=
Ilk
Uj LAJ
T,
Uj
o. jt: i.
4
alp
T�i
;.00;
:PRO�OSED GN)t
-A I'
W-.500
'00
1
J_
t 1.7
'0
SEE F
ROFILE B
'FOR CO
4TINUATION
fl.
f
00FILE C
-SEE
45
FOR UNTINUATION
ss
0
7
7
'j
-4
1
f
N I,�
�n A, n rlr%c
Evi I OW
S Dt:1 RIPT10W
-�§�NEDBYi,-]
DE
WFF
4S
E Al t:
7_71-1
A;11
07 1
DIRMI b r.
UIWING' �A EDESIGN
PROJEt T AO
"OF
/97-
qMM NTS,11
CI Tr E
'i'VA4
CHECK 8 Y.-
07
P ERMfT U AL
W11 >
�10 Y', �P
I, , ; 11 � � -�. � I � I
r% , A:
P & �,:, -
T"I ER
un NE
$ RY, L Mi
P
970 M r 1. r�
WA 3'
WX
11 AIR
�
M 1K '&G
!NQP,I;�'! H N 'TION!
U"""" Lim" N Q PHO
I 'T
` PLA FlLt
'17
A'
1,-
�Wel",,IW4 981
,, - "OIL
1,'1.r,;%r,t!,
Or
4411 14,
6,)
"Al
�.O-
otrl
Ak
n. t,
P
Y..
ttitiitiiitfUJ
cN
Ul)
CD
U4
+
F�
LLJ
'428
426 PRO
IROPOSED GRADEN
426
100 U.
8" S8 5.07.11
C= RIM ELEV. oo
wo
01) 424,
41 +q§
>- Lo "T
422.
4n I a
L IG
A
420
Lj
BUILDIK 1G., UIL01 ,RA
418
f
41
"EW'
PLAN V1
-SCAL5: 1 =j2O
I t I
-414
%A� mm �,,10 cmmcmp,
Df
"THtCONTACTOR IS SPECIACALLY'CAUTIONED 'MAT
OF `W EXISTING
'OCAION .AND/'Q%R` LEVATION
THE-, L
412
UTILITIES AS HOWN ..,ON THESE PLANS, IS -BASED"' ON'
�;COMP
THE, 0EC'ORDS'OF VARious UILIfy ANIES ND'
o, r MEASUREMENTS TAKEN IN 1HE.. FIELD..�
WHERE POSSIE)
L
THE� INFORMATIOW IS�NOT TO BE- RELIED ON -.-AS BEINO
41
ALL
0
EXACTOR -,COMPLETE.: THE 00 NTRACTOR' MUST C
TILITY COMPANYAT,trAS
U
THE APPROPRI ATE T 48 HRS
'BEFOR ANY, EXCAVATIOR TO., REQUESTVACT FIELD
A
ATM OF *,-_424�-5655' "M
LOC OC
CONTRACTOR TO -
RESPONSIBILITY OF THE,
408
41 + 00
40+50
EAS*G','UT1UTIES-,,,WHICH "CONFLICT:ATHIHEL PROPOSM.
0+00
MPROOENTS 'SHOWN THPLANS
OU�'R'S
A
H itP'=^Fl
IISANITAR. Y,..SE%E -1
log DIG,
"PR f9-. L
5
1. 8PQ 4 9,4 5:5
=20'
SCALE H., 1
2'
77
it
N 0.'
W,"DESCRIPAL'.1i
"C :,
_DATE
;4/
OUI WANG,
_,X`REDESIGN
10"8/
:1Y.'. c l"I. 71
MENT
8 /Y9 1
P I T' SUBMITTAL
DESIGNED 'BY",
SOE D A
'971
?8/
u m A VY 141
&PROJECT N
CH!�� Yf�
977711
I K,
w
�, !"r9to,
'ANE"
Jill
r B, R, Rm Y
Lo' C0011'41100MINIV M8
ot
lot.
I I J; "'f ""tt It Ii,
A 203
MIN' I".;f
"J4 K
�tJi
Er* A, A
T
NOR" "WN.1A ING
I ITIL TYI
LA A, N D.
F R, Or L
7w�
t!-Rft
Lom,40%
t
AN 'j,
A.
I
A)�
(296)"52V Va AAA 2006),,,524243"
f
4 1
4V. 1- 0,
Z' I" A`1 1`0 1' 1
A ff �l I
I,Ltr A �zy-,-�
cv
ou� C,6Y
I
1c;
4
4" PVC
@ 1.0%
AREA DRAIN 417.5
CONNECT TO `�
SD 41Z5
4" PVC -±,.5
@ 1.0%
C.O.
IE = 416.75
YARD DRAIN
VYPE I CATCH B
q-�) (TYP.)
Alffil C�R/Ilss C/110 wrp-1
423.37' plmrfl
1JE, SDMH
LE 42 7,93'
P'. WB�71 4 LIC F�IGF'ff OFF Wf') 1, 6'
LE. EAS'r a;Q
r. IVEST 421 ,8'
E3/.kSD1S 01F* BEAR11\,!G
D D------- ID D D D D
D ...... D --k C.
, I " (PLAJ 682,71
682.62
111c,
PK NAIL
0`11 S%TREET S.W.
4, S P HALT R--,,vo420r%
42''
425 ----------------------
42s
Com Mom
.1 T __ - V
'T6.9
A,
---SEE ARCH. P AR 7216
L _ S_FQR _j 208TH ST. SW
417,5
tQNS \0 0
RD6,C-01VE6 -�7
417
_Aj,� .5
BUILDING A-2 BUILDING 6'-1
�� = � 41
FF 417.5 7.5
417,5 4170
YARD 420 (D r-j
DRAIN 20
zo
N
ARE DRAI
CONNE N
0 �60_' TO STOR
421
420
M
417.5
�17.
5 1 V
PVC
4
14
174 1 1 :�: C_ � �1' 417.5
1 1 @ 1.0% -
r
A
"p,
r41g
.0
fF
7
41Z
2 -o)
oURVE)" CAP STAMPED
HSA PLS 29282"
410
4
418.8
P
4184
WEST
41818
F2'1
AIT - 81
418
TYPE 11 CATCH BASIN
3
1 yp.)
3
7
12
L
9
5
M= Cc=
20818
72ND AVENUE W
1 -STORY
WOOD FRAME
4 17 �,@, 4- PVC THR
FrNCE 0, 5'
_WORTH
151 C�,
*'R
�, m
__._L6' RDL
IN
GRAPHIC SCALE
Q
0 0 57.1 TYP.
t
2D 40 80
20 0 10
BUILDING-Dj 72 8 ON,
N
hm mm Rd bmmd ILDING C 2081'H 1T, -V,1 I IN k'-,
I Im Em 11mmmm 1010111119mmm
25
FF 416. FF 417.6 FF 418.21 1 . .... . . . . . . . .
IN FEET
V, 1 -STORY
1 inch 20 ft. CW . _`�
\t4s� �1 ),,j ,, 4'AWIE .... I
42 R�
(n m 417.4
419,
118.2
4LG- -J
7
=11111 Cc=
SEE SHEET C6 �OR
I -STORY STORM DRAINAGH
WOOD FRAME EXTENTION INFORNIATH
9
NO.
DATE
BY
REVISION DESCRIPTION
4/3/98
BUILDING 'A' REDESIGN
12/12/97
SECOND REVIEW
,10/28/97
CITY COMMENTS
�8/4/97
PERMIT SUBMITTAL
DESIGNED BY: ISSUE DATE:
WFF
DRAWN BY: 10/28/97
BF PROJECT NO.
CHECKED BY: 977711
JRG
32519
G�
WIRM MLY 7,19_q___7I
__-AREA DRAIN
EXISTING LEGEND:
SANJ-,ARY S_1w;L-r
I ! �' I I �_. E: -
S3:. VER ` INE
G'A'T C�ii BASIN
0 S -fd
TOf' ffi?AiN'
5"F0 'NE
.. . .........
U'T1U1),i' POLE
C)VERHIEAi) PCII-VER LINHE
I I T" tEGO)k UJINIE
�VEIRJHIEAO PCVVJUR� Y, TELE-COkI,
GAS UNE
N 0 Ul� LA%,?F
EXI-T NG T,0 BF
CONNECT TO
RDL
C-Ni
C. 0.
!\,1E 416.75
W
_J
0
STRUCTURE SCHEDULE
CB#
TYPE
RIM
IE (OUT)
0
1
417.0
413.
1
417.1
413.0
11
417.5
412.5
11
417.6
412.3
11
417.9
412.0
11*
418.35
FLOW CNTL STR.*
417.7
duzow
1
415.8
413.0
1
416.9
412.5
YARD DRAIN
416.8
if
417.2
413.5
* SOLID LOCKING LID
PIPE SCHEDULE
PIPE
DIAMETER
LENGTH
(FT.)
SLOPE
(FT./FT.)
11
0.064
8..
88
0.005
91
8.
36
0.005
F±]
12'
55
0.005
Eo
12m
46
0.005
60"
55
0.000
12"
5
0.005
8"
95
0.005
M
8"
26
0.007
9
8*
40
0.013
6-
40
0.081
6'
101
0.037
OW CONTROL STRUCTURE
01 /WATER SEPARATOR
(TYP.)
`,Vil"I BRAS'3 C.:oYl VhP-;
F 7
nX
Rom
PROPOSED LEGEND:
SPOT El EVATION
PROPOSED CONTOUR
RIDGE LINE
TYPE I CATCH BASIN
C-3
9
TYPE 11 CATCH BASIN
YARD DRAIN
TRENCH DRAIN PER UTILITY VAULT CO.
STORM DRAIN PIPE
NOTES:
1. THE DESIGN SHOWN IS BASED UPON THE ENGINEER'S UNDERSTANDING
OF THE EXISTING CONDITIONS. THIS PLAN DOES NOT REPRESENT A
AILED FIELD SURVEY. THE EXISTING CONDITIONS SHOWN ON THIS
PLAN SHEET ARE BASED UPON THE SURVEY FOR SCHOEDER ARCHITECTSAIA,
PREPARED BY HEBRANK, STEADMAN & ASSOCIATES, P.S. DATED
DECEMBER 1996. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING
04 FIELD CONDITIONS PRIOR TO BIDDING THE PROPOSED SITEWORK IMPROVEMENTS.
IF CONFLICTS ARE DISCOVERED, THE CONTRACTOR SHALL NOTIFY THE
OWNER PRIOR TO INSTALLA11ON OF ANY PORTION OF THE SITEWORK
MICH WOULD BE AFFECTED.
2. THE SPOT �LEVATION INDICATED ON THIS PLAN REPRESENT THE
DESIGN TOP -OF -ASPHALT GRADE, UNLESS OTHERIMSE INDICATED.
ALL UNSURFACED AREAS ARE TO RECEIVE FOUR INCHES
OF TOPSOIL, SEED, MULCH AND WATERED UNTIL A
HEALTHY STAND OF GRASS IS OBTAINED.
4. ALL CATCH BASINS AND AREA DRAINS ARE TO BE SITUATED
SUCH THAT THE OUTSIDE EDGE OF GRATE FRAME IS AT TOE
OF CURB (WHERE APPLICABLE).
5. CONTR�CTO'R TO GRADE ALL AREAS TO PRECLUDE THE
PONDING OF WATER.
6. STORM DRAINAGE PIPE WITH LESS THAN 2'-0" COVER
SHAH BE CLASS IV REINFORCED CONCRETE PIPE,
OR APPROVED EQUAL TO SUSTAIN H-20 LOADING.
7. ALL ONSITE STORM DRAINAGE PIPE SHALL BE SMOOTH WALLED INTERIOR,
MANUFACTURER'S VERIFICATION OF MANNING'S ROUGHNESS
COEFFICIENT n=0.012 OR LESS. ADS N-12 IS NOT TO BE USED.
8. CATCH BASIN INLET PROTECTION / EROSION CONTROL TO BE
USED FOR ALL NEW INLETS.
9. CONTRACTOR TO CONNECT ROOF DRAIN LEADERS TO PROPOSED
STORM DRAINS AS SHOWN.
10. CONTRACTOR TO REMOVE UNSUITABLE SOILS LOCATED WITHIN THE
BUILDING SPLAY LINE OF THE FOOTINGS.
11. THE CONTRACTOR SHALL COORDINATE WITH PUGET SOUND ENERGY SERVICES
�N0 WORK IN THE AREA QF THE EXISTING 10 GAS LJNE IN 72ND AVENUE A
OT SHOWN ON SURVEY) ,
CAUTION - N0110E TO CONTRACTOR
THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT
THE LOCATION AND/OR ELEVATION OF EXISTING
UTILITIES AS SHOWN ON THESE PLANS IS BASED
ON RECORDS OF THE VARIOUS UTILITY COMPANIES
'AND AVAILABLE AS -BUILT INFORMATION. THE
INFORMATION IS NOT TO BE RELIED ON AS
BEING EXACT OR COMPLETE. THE CONTRACTOR
MUST CALL THE APPROPRIATE UTILITY COMPANY AT
LEAST 48 HOURS BEFORE ANY EXCAVATION TO
REQUEST EXACT FIELD LOCATION OF UTILITIES. IT
SHALL BE THE RESPONSIBILITY -OF THE CONTRACTOR
TO RELOCATE ALL EXISTING UTILITIES MICH CONFLICT
WITH THE PROPOSED IMPROVEMENTS SHOWN ON
THESE PLANS.
Washihgton Land Design �,Zrlj I -off -f-4 P1 1/n
Planning & Engineering TUR 1"N" om" E tami" 1P11 IV L A N E C 0 N D 0 M I lom"I U M S Nil/
p, I Ihk 1
9709 Third Avenue ME.,. Suite 203 EDMONDS, WASHINGTON GRADING AND DRAINAGE PLAIM C-1
Seattle,, WA 98115
(206) 522-9510 FAX.- (206) 522-8344
FRAME & GRATE
RISER OR ADJUSTMENT SEC71ON
#3 8 AR
EA.CORI
#3 BAI
EA.SID1
#3
C
. T111 I
FRAME AND GRATE — /" �4
(INSTALL W/ FLANGE
DOWN OR CASTINTO
RISER)
PRECAST BASE SEC11ON
NT AT THE
E. BASE) 1-43 BA
PICAL KNOCKOUT V
MIN WALL THICKNI
2—#3 BA
PROVIDE 18" MINIMUM DEPTH COMPACTED
GRAVEL BACKFILL FOR PILE BEDDING
BELOW CATCH BASINS
TYPE I CATCH BASIN DETAIL
COVER
N0.84-2-M" __\
1,2w ros.
OU`tLETPIPE
WITH SAMPLING TIEE
BY OTHERS
10ASIR ASSIEmBLY
No. 860-CPS
6=6 am
OUTLET WEIR
OIL RETAININIG BAFFLE
COALESING MEDIA
INLET WEIR
OIL/WATER SEPARTATOR
NTS
FIBERGLASS
HOLD-DOWN CHANNEL
NO.
DATE
BY
REVISION DESCRIPTION
10/28/97
I I
CITY C I OMMENTS
PERMIT SUBMITTAL
INLTLT PIPIE*
WITH ELBOW
BY OTHERS
6" RISER SECTION
12" RISER SECTION
DESIGNED BY: ISSUE DATE:
WFF
DRAWN BY: 10/28/97
BF PROJECT NO
CHECKED BY: 977711
JRG
F%rq ' 1
32519
IST
IONAL
00
X
C-4
C.D
09 CN
20"X24" OR
24* DIA.
F
48" UNLESS
OTHERWISE NOTED.
MORTAR FILLET
\77 ".7`>
. <
r
6"
ca —
FOR SEPARATE CAST
IN PLACE ONLY
"0" RING
PRECAST B ASE JOINT
1,
HANDHOLDS
FLAT SLAB COVER
STEPS & LADDER
PRECAST BASE
W/ INTEGRAL RISER
EINFORCING STEEL
(FOR PRECAST BASE W1 INTEGRAL RISER)
0.15 SQ. IN./FT. IN EACH WAY FOR 48"DIA
0.19 SQ. IN./FT. IN EACH WAY FOR 54"DIA
COMPACTED GRAVEL BACKFILL FOR PIPE
BEDDING, 6" MIN COMPACTED DEPTH. FOR
PRECAST BASES ONLY.
1 L
SEPARATE CAST IN -PLACE OR. SEPARATE PRECAST. BASE
REINFORCING STEEL (FOR SEPARATE BASE ONLY)
0.23 SQ. IN./FT. IN EACH DIRECTION FOR 48"DIA
0.19 SQ. IN./FT. IN EACH DIRECTION FOR 54-DIA
TYPE 11 CATCH BASIN
NTS
I
co
IE=417.25
NOTE:
FOOTING DRAINS CANkT BE CONNECTED TO DETENTION
SYSTEM PER CITY OF EDMONDS �REQUIREMENTS
FOOTING DRAIN IJETAIL
SCALE: 1"=40'
SOLID COVER
RIM EL 417.7
2 � TYPE 2, 54" 0
t"') CATCH BASIN
STEPS OR
LADDER
GASKET (TYP.)
SHEAR GATE
36"0 IN
it = -cl I.Ou
SLEEVE COU[ILING
NON —SHRINK GROUT
WELDED STEEL PLATE W/
1.75" DIA. ORIFICE (#1)
12"0 OUT
—%ftxl ft-1:2=1 1 00 FLEXIBLE
ADAPTER
C 0"4 COUPLING
2—GALV.STEEL
STRAPS (TOP
AND BOTTOM)
54 to 0
--OW CONTROL STRUCTURF
Washington Land Design h I
Planning & Engineering TURNBERRY LANE CONDOMINIUMS
10700 Meridian Avenue N., Suite 503 DIVIONDS, WASHINGTON DRAINAGE DETAILS C-3
Seattle,, WA 98133
(206) 365-9510 FAK.- (206) 365-0225 1 1 1
EXPBO JMY 7, 1998
C)
L
�'6
UJ
V)
J'
Cl-
I.L�
I =vl I I'
A
FA
CAU11ON — N0110E TO CONTRACTOR
THE CONTRACTOR IS SPECIFICALLY CAU11ONED THAT
THE LOCATION AND/OR ELEVATION OF EXISTING
UTILITIES AS SHOWN ON THESE PLANS IS BASED
ON RECORDS OF THE VARIOUS U11UTY COMPANIES
AND AVAILABLE AS —BUILT INFORMATION. THE
INFORMATION IS NOT TO BE RELIED ON AS
BEING EXACT OR COMPLETE. THE CONTRACTOR
MUST CALL THE APPROPRIATE UTILITY COMPANY AT
LEAST 48 HOURS BEFORE ANY EXCAVATION TO
REQUEST EXACT FIELD LOCATION OF UTILITIES. IT
SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR
TO RELOCATE ALL EXISTING UTILITIES MICH CONFLICT
WITH THE PROPOSED IMPROVEMENTS SHOWN ON
THESE PLANS.
NOTES:
1. CONTRACTOR TO REPAIR EXISTING PAVEMENT, DRIVEWAYS,
OR OTHER PROPERTY DISTURBED DURING THE COURSE
OF CONSTRUCTION. ' '
2. CONTRACTOR TO VERIFY ALL EX. UTILITIES AND IMPROVEMENTS
IN FIELD PRIOR TO ANY EXCAVATION.
3. COORIDATE ALL CONSTRUCTION WITH THE CITY OF EDMONDS
DEPARTMENT OF PUBLIC WORKS.
PROPOSED LEGEND:
TYPE I CATCH BASIN c 3
0 TYPE 11 CATCH BASIN
STORM DRAIN PIPE
EXISTING LEGEND:
f Sr'_ ER I�AANHOLF
,3r_WFR UNE
0 BASIP4
(43� f)RA,jN IMAN"HOLE
STOiRM CRAIN LNE
"I"A TZ, R LINE7,
POVVEr', LINI.:7.
L POIW�-R' _Ak 'r LIT
i
("A., LIME—
BENCHMARK:
SEWER MANHOLE #4, L.I.D. #206, SHEET 5 OF 7
FILE 1.990
RIM ELEV. = 419.73'
ELEV. = N'LY INVERT = 408.57
El FV. = S'LY INVERT = 408.47
NO.
DATE
B Y
REVISION DESCRIPTION
12/19/97
CENTERLINE, SURVEY
12/15/97
CITY COMMENTS
10/28/97
CITY COMMENTS
8/
4/97
PERMIT SUBMITTAL
422
420
418
416
414
412
410
408
406
404
402
400
398
0
1 cj)
cri
)LI
41
SEE SHEET C-1 FOR ON —SITE STORM DRAINAGE INFORMATION : As'�"
R7...... ...... . . . . . . . . . .
. . . ............................ I .... . . . ........................ I .... . . . ...................................
12" SD >< >< X
M
EXISTING CB
RIM 407.93
IE 401.50
C:)
V)
171
C)
X
:m
C14
w�
5m CD
3 rZ, Lo
C/)
C) M CD
C-4
+
cl '_:
CD lid- CD
10-
Lo
cm
En
>- I r--:
V) I
:< n
SCALE: 1"=20'
r
:CBT
9
TYPE 11
<
RIM = MATCH
EXISTING GRADE
(417.5±)
IE = 408.4
c%
Lo L"
cn C) M Ln
uj
9 11
cl
I '�
F15 i
I'D
Z
814
Z
m
C-)
M
CD
V)
m
m
V)
LL-
C)
LLj
�g
M
cn V)
Lo
c)
-8
u
V)
C-4
r-: 'd:
L.LJ
V)
LL.
(D M Lo
LLJ 00
w
L6
CN
0) Lo
LLJ
cq
re)
n
LLJ
F-3
+
r1l)
C'j
00 11
+
pl)
V)
a
i I If^
H
U-i
U)
CE. o
LLJ
CO 11
u
a-
0 CL Fx
1
00
E)O!;nNG
GRADE 0 GENTERUNE-\
ol
.00 op
e
#.*
Of-
00
'Isg
10,
Ak
.00
0-01
H U
000l-
tj
I -
0+00 0+50 1+00 1+50
72ND AVE W PROFILE
DESIGNED BY:
ISSUE DATE:
WFF
10/28/97
DRAWN BY:
PROJECT N
977711
I
BF —
CHECKED BY:
JRG
0 * V.: i W'0'1! ml 1w. * - wl_ " 0 -4
- P"al
' , flAl
MitwL
2+00 2+50
SCALE: H: 1*=20' V. 1"=2'
Moff
3+50
1EXPIRES 7/7/0(5
EXISTING TREE TO REMAIN, TYP -
data
OBTAIN ME) ADHERE TO THE
F
0C
project
THE RECOMMgt �ATI Ns-QF
A PRx;)FESSIONAL AFeORI6T
FOR PROTECTION OF TREES
REMOVE EXISTING
c ------- 1,
A Al
PROJECT NAME. TURNIBERRY LANE CONDOMINIUM5
THROUGHOUT THE CONSTRUCTION
PLANTING THIS AREA
ADDRESS: 121a 20aTH 5T, S.W.
PHASE. MNE EXISTING TREES
AS REOID
"01
EDMONDS, WASHINGTON
To PROVIDE 1'-0' CLR BELOW
JF
L 1 C. P�
-56 MW USED As Fil ED OFF-51TE
LOWEST BRANCHES.
45'
DATUM FOR ALLOL*BLE 5Lr.>G
TAX PARCEL NUMBERS: 3WI-000-005-0000
4.5'
HEIGHT. (E) RIM EL, 421.45
DATUM EL. 1000
OR WT. CALCS.
PROP05ED USE. CONDOMINIUMS
EH
CODE: UBC IVB1
EB
CURRENT ZONING RM 1.5
CONSTRUCTION TYFE:
ROOF OVERHANG,
ROOF OVERHANG,
16T FLR PARKING V-1 HR
TYP
TY x
UNIT 101
15T FLR DWELLINC V-1 HR
(E) EL.
3 a V.�>'
P-
I
2ND 4 3RD FLR V-1 HR
421,B
1
17,
(E) EL.
I.".
1 41
OCCUPANCY TYPE;
15T FLR PARKING 53
J,
4242 r-
16T FLR DWELLING UNIT 101 RI
fDtnr= en\/=rvUAM11. Typ
w,
ELEvAT IONS NOTED AS '(E)'
2ND 4 3R0 FLR Rl'
C%J
E
C
LA_
Ce
site plan
SCALE:
project
208TH 5T SW
location
210TH ST SW
I I I I I I
I I
I I I I I I I
vicinity ma
NO SCALE
FREVIOU51-Y-FERMITTED PORTION
TO REMAIN UNALTEREC)
mol-ill
NOTE: PROVIDE ATTIC VENTING EQUAL TO 1/300
OF THE AREA TO BE VENTED PER U.BC. 15053,
EXCEPTION 1. PROVIDE 50% OF THE REQUIRED
VENT AREA IN VENTILATORS LOCATED 3'-O'MIN
ABOVE THE CONTINUOUS EAVE VENTS. RIDGE
VEENT6 SHALL PROVIDE A MINIMUM OF 3/4 SQUARE
INCH OF VENT AREA PER LINEAR FOOT OF VENT.
�3
J
G A2 (BLDG Al SIM)
LENGTH OF ATTIC VENTING (INCL. RIDGE)
EAVE VENTING a 321'-4' LF
RIDGE VENTING a 223'-2' LF
ATTIC AREA a 5250 SF
VENT AREA REQUIRED -- 5250/ 300 2 11-F 5F
VENT AREA PROVIDED a (3213 + 223.2) LF x V a 45A 5F
5TORIE6.
THREE
HEIGHT:
30 FT. AE50VE AVERAGE GRADE
VALUATION:
vno,000
SITE AREA
522(ol ^
UTO AT'
FIRE PROTECTION: AUTOMATIC SPRINKLER SYSTEM TO MEET U5C
WITH RESIDENTIAL QUICK -RESPONSE SPRINKLER
QHE'TA'r,M>_5 U6AH"4ERE ALLOWED BY THE STANDARD.
area
summary
ALLOUJABLE AREA CALCULATION:
BLDG A (63 OCCUPANCY - 14,WO (TABLE
5-15) x 50% INCREASE
(SEC 50511) - 2 YD6,0 60' - 21000
5F.
BLDG A (RI OCCUPANCY - 10,500 5F (TABLE 55) X 2
(SEC 504.2)
X 50% INCREASE (SEC 505.1.1 - 2 YIDS 0 60' a 31500 5F,
5LDG$ 5. C LP - 6000 SF (TABLE
55)
,- Al
BLDG - 15TFLR (PAWING 4 1 UNIT)
ARE FLR AREA
TOTAL
PARKING 4021 5F
4021 SF
LOBBY 4 STAIR 331 &F
331 Sp
UNIT 101 6W 6F
880 SF
TOTAL 5eMT AREA 5235 5F
5238 SF
BLDG A2 - 2ND FLOOR (4 UNITS
UNIT FLR AREA
DEC
TOTAL
201w 1133 SF
35 5F
1166 5F
202W 113E, 5F
41 5F
IV 5F
203ui 1263 SF
1263 SF
204w 101(o SF
101(0 SF
COMMON AND STAIR 46a 5F
420 $F
TOTAL 2ND FLR AREA 5O'B5 50F
&2 5F
5111 _Cq--
BLDG A2 - 3RD FLOOR (4 UNITS
UNIT FLR ARE
D E
TOTAL
301W 1133 5F
35 5F
1168 _Cf
302w 113E-) _15F
41 SP
1182 6F
303W 12(03 6F
3S SF
1302 5F
304w 10-I& SF
35 5F
III] 5F
COMMON AND STAIR 401 SF
401 5F
TOTAL 3RD FLR AREA 5008 _cF
5(0 5F
5164 SF
TOTAL BLDG Al AREA IE,341 6F
238 6F
1551S SF
5LDGA2 - 15TFLR (PA 11s* I I UNIT
AREA FLR AREA
TOTAL
PARKING 4033 ef
4033 SP
LOBBY 4 STAIR 331 SF
331 5F
UNIT 101 880 ef
t3w SP
TOTAL 5SMT AREA 5250 51-F
B1250 SP
BLDG A2 - 2ND FLOOR (4 UNIT$
UNIT FLR AREA
IDE
TOTAL
201w 1133 5F
35 64:
1166 SF
202w 1135 5F
41 5F
1162 5F
203w 1215 BF
1215 SP
204w 101(0 5F
1016 6F
COMMON AND STAIR 488 5F
486 5F
TOTAL 2ND FLR AREA 5101 6F
62 5F
51as &F
B�IDG A2 - 3RD FLOOR (4 UNITS
UNIT FLR AREA
DEC
TOTAL
301W 1133 5F
35 5F
11(06 5F
302W 1135 6F
41 5F
11,52 SP
303W 1215 5F
3c� 5F
1314 SF
304w 1016 6F
35 5F
1111 5F
COMMON AND STAIR 401 6F
401 6F
TOTAL 3RD FLR AREA 5020 &F
15(0 5F
5116 SF
TOTAL BLDG A2 AREA 15311 SF
238 5F
15615 6F
PREVIOU$LY-FERMITTEI-) 5LIDG
15T FIL 2NID FL
UNIT TOTAL
BLDG 13 (3 UNITS 2110 6F 2336 Of
444& 5F
BLDG C, (3 UNITS 2OW 5F 2306 SF
43ci(o 5F
BLDG Q (3 UNITS) 2OW 6F 230(o SF
43S& 6F
FOOTPRINT AREA: I(P-118 6F
LOT COVERAGE: 32%
TOTAL UNITS: 21
site parking summary
PARKING REQUIRED:
2 5TALL5 PER UNIT x 21 UNITS
54 (INCLUDES HC, 4 H.C. VAN STALLS)
HANDICAPPED STALLS REQUIRED
I
HANDICAPPED VAN 5TALLS REQUIRED
I
PARKING PROVIDED;
COVERED STALLS REGULAR
H.C. VAN
TOTAL
BLDG Al 12
12
BLDG A2 12
12
BLDG 5 5
5
BLDG C 5
5
5LDGID 5
5
SURFACE STALLS 14
1 1
13
TOTAL STALLS 53
55
garage venting
summary
VENTING REQUIRED:
AREA - PERIMETER WALL AREA x 20% a (211 LF x I'-11' HIGH) x 20 a 43(62 SF
LENGTH - PERIMETER WALL LENGTH x 40% - 211 LF x .40 a I 10Z LF
VENTING PROVIDED --
AREA - 585fo eF - 2(o.1 % OF BASEMENT PERIMETER WALL AREA
LENGTH - 112.1 LF x 40.1 % OF BASEMENT PERIMETER WALL LENGTH
r* [W-1 I-
L
A. TH15 PROJECT SHALL COMPLY WITH THE ISS1 U5C, UMC, UPC AND UPC, AND
THE 11354 W5EC, THE ISS3 WA STATE VENTILATION 4 INDOOR AIR QUALITY
CODE AND WAC 51-30 FOR ACCESSIBILITY. THIS PROJECT SHALL ALSO
COMPLY WITH ALL APPLICABLE LOCAL CODES.
B. GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING
CONDITIONS PRIOR TO COMMENCING WORK.
C. DO NOT SCALE DRAWINGS. VERIFY ALL DIMEN51ONS
BEFORE PROCEEDING WITH WORK NOTIFY ARCHITECT
CONCERNING QUESTIONS, CHANGES, OR OMISSIONS. IN
THE EVENT OF CONFLICTS OF CHANGES BETWEEN DETAILS
OR BETWEEN THE PLANS AND SPECIFICATIONS NOTIFY
THE ARCHITECT IMMEDIATELY.
D. ALL DRAWING NOTES INDICATE NEW WORK WHICH SHALL BE
CONTRACTOR FURNISHED AND INSTALLED, UNLESS CLEARLY
NOTED OTHERWISE SUCH AS: 'EXISTING', OR 'EXISTING
TO REMAIN', ETC.
E. CONTRACTOR SHALL VISIT J05 SITE AND VERIFY ALL
FIELD DIMENSIONS AND NOTIFY ARCHITECT OR ENGINEER
OF ANY DISCREPANCIES BEFORE PROCEEDING WITH WORK
F. FIN15H FLOOR REFERENCE DATUM EQUALS (0.0). REFER
TO TOPOGRAPHIC SURVEY FOR ACTUAL SITE ELEVATION.
G. ALL WOOD IN CONTACT WITH CONCRETE OR MASONRY SHALL
BE PRESSURE TREATED WOOD OF ANY SPECIES OR
FOUNDATION GRADE CEDAR OR REDWOOD, ALL MARKED BY
AN APPROVED TESTING AGENCY,
H. ALL WOOD FORMS USED FOR CONCRETE IN THE GROUND OR
BETWEEN FOUNDATION SILLS AND THE GROUND SHALL BE
REMOVED.
1. DIMEN51ONS ARE TO FACE Of: STUD OR GIRT, FACE OF CONCRETE
OR MASONRY, CENTERLINE OF COLUMN, UNLESS OTHERW15E
NOTED.
J, ALL GYPSUM WALL BOARD IN MOISTURE PRONE AREAS TO BE
WATERPROOF.
K. SURFACE MATERIALS LL441CW ARE PART OF THE
FLOOR -CEILING WALL A55EMBLY SHALL BE INSTALLED
PRIOR TO FINAL IN6f�.MTION.
L. PROVIDE FIREBI_oc�i�G AT THE FOLLOWING LOCATIONS:
I - AT CONCEALED SPACES OF: STUD WALLS INCLUDING FURRED SPACES
AT THE CEILING AND FLOOR LEVELS AND AT 10 FOOT INTERVALS
50TH VERTICAL AND HORIZONTAL,
11 AT ALL INTERCONNECT IONS BETWEEN CONCEALED VERTICAL AND
14ORIZONTAL SPACES.
III IN CONCEALED SPACES BETWEEN STAIR STRINGERS AT THE TOP
AND BOTTOM OF THE RUN AND BETWEEN STUDS ALONG TWE RUN OF
5TAIRS IF WALL$ UNDER THE STAIRS ARE UNFINISHED.
IV IN OPENINGS AROUND VENTS, PIPES, DUCT$, CHIMNEYS, FIREPLACES
AND 51MILAR OPENINGS WHICH AFFORD A PA56AGE FOR FIRE AT
CEILING AND FLOOR LEVELS WITH NONCOMBUSTIBLE MATERIALS.
V. FLOOR AND CEILING DRAFT STOPS SHALL, BE INCLUED IN ALL
IN LINE UNITS. ALL VOIDS TO BE SEALLED.
M. PROVIDE SMOKE DETECTORS AS SHOWN AND As REQUIRED.
N. THE CONTRACTOR SHALL PROVIDE A FULL-TIME PROJECT
SUPERINTENDENT DURING THE ENTIRE COURSE OF THE PROJECT
0. VENT HOT WATER TAW RELIEF VALVES DIRECTLY TO BLDG EXTERIOR.
P. CONNECT ALL ROOF DRAJN5 TO AN APPROVED DRAIN SYSTEM. SEE
CIVIL DRAWINGS.
Q, FIRE RATING OF 2ND FLOOR A55Y REDUCED TO 2-HR PER U15C TABLE 35,
FOOTNOTE 5.
R. ALL INSULATION ON PIPES 4 INSULATION 4 ITS FACINGS SHOULD WAVE A FLAME
SPREAD RATING OF 25 AND A SMOKE DEVELOPMENT RATING OF 450.
esign approvs
---FILE NO. ADB-S&-150
................. 1111,0111 ........... 1111"11110,111 ..............
(deferred submittals
THE FOLLOWING PERMITS ARE NOT INCLUDED IN THIS SUBMITTAL:
1. FIRE SPRINKLER - A TYPE 13-R SPRINKLER SYSTEM 15 TO BE INSTALLED
THROUGHOUT THE RI OCCUPANCY AREA, AND A HAZARD GROUP 11 DRY
SYSTEM WILL BE INSTALLED THROUGHOUT THE 63 OCCUPANCY AREA.
ENTIRE SYSTEM TO MEET UBC STANDARD 13-1 SYSTEM.
2. ELECTRICAL
3. MECHANICAL - COMBUSTION AIR CALC5 FOR FURNACES 4 HWT'S WILL BE
BE SUPPLIED W1 APPLICATION FOR PERMIT.
4. FIRE ALARM
5. ENGINEERED ROOF TRUSS DRAWINGS TO BE SUBMITTED 5Y MANP.
(o. ELEVATOR 614OF DRAWINGS AND MACHINERY TO BE SUPPLIED BY MANP,
average grade calculations
REFER TO SHEET CI FOR GRADE ELEVATIONS.
BLDG Al
ACTUAL REL. TO DATUM
EX15TING GRADE -0 CORNERS: 422.4 1350
4 2 4 2 'Brole
4n.1 'B23
AVERAGE GRADE.- '340
ALLOWABLE HT x AVG: GRADE 30': 124.0
ACTUAL BLDG HEIGHT: 1233
BLDG A2
ACTUAL REL. TO DATUM
EXISTING GRADE 10 CORNERS: 421,5 1343
422.4 IB5.0
41S.5 S2.1
41S.5 (32.1
AVERAGE GRADE: IB33
ALLOWABLE HT cc AVG GRADE + 30'- 1233
ACTUAL BLDG HEIGHT; 1233
symbols
'T
SECTION
SECTION
X IDENTIFICATION
X LOCATED ON
SWEET
NOTE/PAINT
REFERENCE
CI 11A > DOOR SYMBOL
WALL TYPE
NORTH ARROW
SANITARY 5EWER MANHOLE
5TORM DRAIN MANHOLE
FIRE HYDRANT
0 TELEPHONE JUNCTION BOX
-(> UTILITY POLE
;P,EV15ION CLOUD
IDENTIFYING NUMBER
PARCEL 4:
TRACT 5, FLAT OF AURORA HEIGHTS, ACCORDING TO THE FLAT THEREOF
RECORDED IN VOLUME 12 OF FLATS, PAGE 120, RECORDS OFSNOHOM16H
COUNTY, WASHIW-sTON.'
PARCEL 5:
TWAT PORTICN OF TRA,,�-T 6, AURORA HEIGHT$, ACCORDING TO THE FLAT
THEREOF RECORDED IN VOLUME 12 OF PLATS, PAGE 120, RECORDS OF
SNOHOMISH COUNT-, WASHINGTON, DESCRIBED As FOLLOWS:
COMMENCIN6.2 AT THE NORTWEAST COF;�NER OF SAID TRACT 6
THEN SOUTH ALONG THE EASTERLY LINE OF SAID TRACT 6, A DISTANCE
OF 132 FEET +/- ,
THENCE WEST AND PARALLEL TO THE NORTH LINE OF SAID TRACT (o TO
THE WEST BOUNDARY LINE OF TRACT (o +/-
THENCE NORTHERLY ALONG THEWE5TLINEOF5A1D TRACT (o, A DISTANCE
OF 132 FEET TO THE NORTHWEST CORNER OF SAID TRACT & +/-
THENCE EAST ALONG THE NORTH LINE TO THE POINT OF BEGINNING.
EXCEPT PORTION DEEDED TO CITY OF EDMON05 BY DEED RECORDED UNDER
AUIDITOR'5 FILE NO. 6VII-10201.
PARCEL C:
TRACT (o, AURORA HEIGHTS, ACCORDING TO THE FLAT THEREOF
RECORDED IN VOLUME 12 OF PLATS, PAGE 120, RECORDS OF 5NOWOM15H
COUNTY, WASHINGTON4/-
EXCEPT THE NORTH 212 FEET THEREOF.
SITUATE IN THE COUNTY OF SNOWOM16H, STATE OF WASHINGTON.
sheet index -
ARCHITECTURAL
AIJ 51TE PLAN AND GENERAL INFORMATION
A2.1 FIRST FLOOR PLAN
A2.2 SECOND FLOOR f=>LAN (THIRD FLOOR SIM)
A23 ROOF PLAN
A2.4 ENLARGED PLANS AND DETAILS
A215 ENLARGED PLANS
AB -I ELEVATIONS
A4.1 SECTIONS AND DETAILS
A4.2 SECTIONS AND DETAILS
CIVIL. - PERMIT REVIEW COMPLETED.
STRUCTURAL
SI FOUNDATION PLANS 4 DETAILS.
52 2nd FLOOR FRAMING 4 DETAILS.
63 3rd FLOOR FRAMING 4 [DETAILS.
54 ROOF FRAMING 4 DETAILS.
65 NOTES 4 DETAILS.
LAND5CAFIN
L I LANDSCAPE PLAN
00 T'2
INTERIOR ELEVATION
aX ELEVATION IDENTIFICATION
X-- LOCATED ON SHEET
CENTER LINE
PROPERTY LINE
APPROVED By PLA14%1140