Loading...
20903 70TH AVE W.PDFIIIIIIIIIIII 5518 20903 70TH AVE W 2f If * ; 77.9-?58; RECEIVED OCT 27 2010 86ILDI14r, DEPARTMENT (LI CITY OF EDMONDS ST EET- A . ADULT RESIDENTIAL TREATMENT FACILITY HYDRAULIC CALCULATIONS mc 9-19-85 85-4021 SURVEYING ENGINEERING PLANNING MANAGEMENT . -i "I I j 1 8,5--4ozi � I xxx fA tm %ft a 0 0 0 A A A N " " VotumF- pp-ov I Deb PIPF, 4 C5 Syl.'Tem I/z. (,s 7-7- s-+ > O*P- I Pl C* F- 07= D.-GZA17-3�- qL &Y, A= aveoL or- opur-le-p- * -3z.Z 0, 4 4 Z Rm,aGeor,-i 0 v e*.r- Lo vi So A.#, xe^:r-e p- rgA4 25- To,p o r- e-v P- 6 TO p or- We-s-T- C's L,v w , tj bp-i vw A-i LL I. I Ts, W I Lj— tF S710 a. YVI ,47- ep 4 -7- 5. So we s 424.-)5- (,F-e s T 4-zs,.00 V, s Cwpf-G C-: -ro Srkee-r 9-)r, co-e 0 .5 kS-rk I Ut� OVEAPLOW, % 7 1 kDvl(,T �#�l (It OLB 17 . E I s ep, -.I;q r-Lo W Us ti E7 LI) e, i X bit.. NA lu w Di N .6 #A fA 4A 0 cc sm 4z4.SD jo- 3 =:91.119 cips 11/0. 0.7.1 C�s Scs Ftkt- Qe '= 0. 677 Dow tj b, P-cm-r 1 .6 IJ Po r- G? A cl 0 0. r/ Te, 01 -A) ND5 7M 9 ArDs Z'7a 0. Y3 eac 61ml 1000 MINN smillill m I= 1,91,11101115MEA a A 111mm NWMWIQPA�W���=M W. m 0 0 0 5 0 n ow W� ENVAN 'A 10111 Ills-W 111HPA'AlUZZMUM VAW!�, 'AM I 111111111111100 100 7 3 STREET FILE City of Edmonds Site Classification Worksheet 0 W( OV EnAl " , f,?,? 'y' IS, The project's Classification serves to identify the specific Stormwater Management requirements applicable to your site. Complete the worksheet below to determine whether your project falls into the classification of a Large Site, Small Site (Category I or Category 2), or a Minor Site. Step 1: Determine the Exempt Impervious Surface Area for your project and enter it on line I of the table (yellow box). Stel) 2: Determine the Replaced Impervious Surface Area for your project and enter it on line 2 of the table below dividing the total between Exempt and Non -Exempt (orange and blue boxes); either or both may be zero. Stev 3: Determine the New Impervious Surface Area for your project. If a portion of the new impervious surface area is also Non -Exempt Replaced Impervious Surface Area subtract this from the total of the new impervious surface area. Enter the final value on line 3 of the table below (blue box). SlUl 4: Add the values in the Non-exempt column for lines 2 and 3 and enter it into line 4 (green box). Where does the existing site runoff discharge? (Check all that apply) See Watershed Map I Figure-13, Handout pg 4 Supplement Chapter 2.3 El Direct Discharge 13 Edmonds Way Basin Creek or Lake Basin Line Type Area (square Feet) Impervious surface: How much and what type? (fill in coloy-ed boxes) See Definitions, Handout pg 9 Figure-C, Handout pg 7 Supplement Chapter 2.2 & Figure-C 1. Exempt Exempt Non -Exempt 2. 77 Replaced 0 — Examples, Handout pg 10 3. New 4. Total Replaced +New (Non -Exempt) (add numbters in bhie boxes) 35 Z- Land -disturbing activity area See Definitions, Handout pg 9 Supplement Chapter 8 sf Grading, Fill or Excavation Area sf Will project convert % acre or more of native vegetation to El YES M—NO lawn or landscaped area? Proceed to the Proiect Classification Chart (Figure D, pg 8) and use the data collected above to follow the flow chart and determine the classification of your project. LJ Large Site (Handout E72a) E] Small Site (Handout E72b) 5��inor Site (Handout E720 P_� Revised on 719110 E72 - Stornmater Management Erosion Confrol-FEVAL2 Page 5 of 11 City of Edmonds Critical Area Notice of Decision Applicant: J- 5 Property Owner: �(//Vl( F h CLIVV Critical Area File -2-0 1,9 -CY) (0 � Permit Number: 20 10 -0 7�3 Site Location: Z0q05 70 oi, (�(,e Parcel Number: Z -70 Y ? .0 0 0 30-2-7oc Project Description: &Lwaiver. No critical area report is required for the project described above. I . ,�' There will be no alteration of a Critical Area or its required buffer. 2. The proposal is an allowed activity pursuant to ECDC 23.40.220, 23.50.220, and/or 23.80.040. 3. The proposal is exempt pursuant to ECDC 23.40.230. [] Critical Area Report Required The proposal minimizes the impact on critical areas in accordance with ECDC 23.40.120, Mitigation sequencing; 2. The proposal does not pose an unreasonable threat to the public health, safety, or welfare on or off the development proposal site; 3. The proposal is consistent with the general purposes of this title and the public interest; 4. Any alterations permitted to the critical area are mitigated in accordance with ECDC 23.40.110, Mitigation requirements. 5. The proposal protects the critical area functions and values consistent with the best available science and results in no net loss of critical functions and values; and 6. The proposal is consistent with other applicable regulations and standards. F Limited report for stable erosion hazard consistent with ECDC 23.80.050.H required. F-� Critical Area specific conditio'n(s) have been applied to the permit number referenced above. See referenced permit number for specific condition(s). The proposed project as described above and as shown on the attached site plan meets or is exempt from the criteria in ECDC 23.40.160, Review Criteria, and complies with the applicable provisions of the City of Edmonds critical area regulations. Any subsequent changes to the proposal shall void this decision pending re -review of the proposal. /11 ( /<a— G�v V-411 a_ a 4� 11 �, 0 Reviewer Signature Date Revised 11/03/2010 PLANNING DATA STREET New Commercial I Multi -Family Projects Name: Date: 10 Site Address'. Plan Check #: BLD - 2-9 rO — 0 70/3 Project Description: _Addcf(d Use(s) Proposed: Allowed Use: (YES I NO) CUP File Number: To Allow What Uses: Legal Nonconforming Land Use Determination Issued: (YES I NO) Reduced Site Plan Provided.Ag� I NO) Zoning:L C,-� Map Page: Comp Plan Oesignation:#,[,,A,,,, Comer Lot: (YES i Op Flag Lot: (YES i' C AD6 File Number (date waived): .41YA Lot Area: 2 4 ff 3 0 Plans Match ADB Approved: (YES / NO) ffA Shoreline Required: (YES 109 Critical Areas Determination #: zo 10 -0 10 k El Study Required dd'waiver SEPA Determination: Exempt El Needed (for sites with 500 cubic yards of grading or within 200 feet of Puget Sound or Lake Ballinger. Requires: (1) Fee, (2) Environmental Checklist, and (3) APO List with notarized form)- Rd4iAre&S& acks tb Street - Sid 0 -5 Rear: 0 A-q �SeioacAs Street.- q Side: -t- Side- Rear.- 0-f- Lot Coverage/FAR Required: /VA__ Lot Coverage/FAR Provided: AM Lot Coverage/FAR Calculations: ffA Byddihglk44,�t Datum Point: Datum Elevation-. Maximum Height: Actual Height: 10 C, h4t414L Subdivision: Lot Aggregation Required: sgaping Landscaping Matches ADB Approved: Landscaping Bid Provided: (YES I NO) Bond Amount (100% Bid) Plan Review By.- I PLANNING DATA STREET New Commercial I Multi -Family Projects �lParkingAnal ysis Business Name Type/Use I f - (4 &t;h C� six Parking Ratio —1 )el ce- Tenant . Area 106e�oari5 Required Parkinq 3.3-3 q(e( Total Parking Required Total Parking Provided-- 4 v multi-Faipil P.4rkif ig.4 . Y Bedrooms per Dwelling Unit Parking Ratio # Units R � _ -ed _.!c� Parking Studio 1_21D.U_ I Bedroom 1-510. �. 2 Bedrooms 1.81D.U. 3 + Be �Ms 2.0/D.U_ Total Parking Required. - Total Parking Provided. - 0 +0 fq A I I Plan Review By: 6 0 Z010 0 7?3 I City of Edmonds Traffic Impact Analysis Worksheet 0 ltdla 4,1n V Vvt T Name of Proposed Project: Owner/Applicant Name Street/Mailing Address city State Zip Telephone: OV FQA:r 0 �') F6 Appl . int Contact Persia� A sA7AW Name .S� r) Street/Mailing Address city State Zip Telephone: nl'rL� f , Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): Firm Name Telephone: THRESHOLD LEVELS OF ANALYSIS Contact Name E-mail: Pr9ject Traffic Levels Sections to Complete I. Less than 25 peak -hour trips generated I and 7 only (Worksheet/Checklist) 11. More than 25 peak -hour trips generated All sections 1. PROJECT DESCRI[PTION a. Location - Street address: )�q e- _(Attach a vicinity map and site plan.) blft-gEcif . existing land use: y Dat I p p pe and size of development:.—A,Lfi3O-y\ Z E G of residential units andlor squarefootage of huilding) RESUB Revised on 6124110 M2 - Traffic InipactAnalysis Worksheel Page I of 5 NOV 3 0 2010 -MENT BUILDING DEPAR� CITY OF EDMONDS %4 :30 M M- "4 —n UNW500 romo M d. Date construction will begin and be completed: e. Define proposed access locations: J f. Define proposed sight distance at site egress locations: I'S171 Y14. 2. TRIP GENERATION Source shall be the Eighth Edition of the Institute of Transportation Engineers (ITE) Trip Generation manual. For independent fee calculations, the current edition of the ITE manual may be used. ADT = Average Daily Traffic PM Peak -hour trips (AM, noon or school peak may also apply as directed by the City Engineer) a. Existing Site Trip Generation Table: Land Use Daily (ADT) PM Peak -Hour Trips IN OUT b. Proposed Project Trip Generation Table: Land Use Daily (ADT) PM Peak -Hour Trips IN OUT c. Net New Project Trip Generation Table: PM Peak -Hour Trips Land Use Daily (ADT) IN OUT d. State assumptions and methodology for internal, link -diverted or passby trips: Revised on 6124110 E82 - Traffic Impact Analysis Worksheet Page 2 of 5 3. TRIP DISTRIEBUTION Prepare and attach a graphic showing project.trip distribution percentages and assignments. For developments that generate over 75 peak -hour trips, the City Engineer reserves the right to require trip distribution to be determined through use of the City traffic model. 4. SITE ACCESS ROADWAY/DRIVEWAYS AND SAFETY a. Have sight distance requirements at egress location been met per AASHTO requirements? b. Intersection Level.of Service (LOS) Analysis: intersections to be evaluated shall be determined by the City of Edmonds Traffic Engineer Existing Conditions LOS Delays Year of Opening LOS Delays Five Years Beyond Change of I LOS Delays Land Use c. Describe channelization warrants: (Attach striping plan.) d. Vehicle Storage/Queuing Analysis (calculate 50% and 95 % queuing lengths): 50% 95% Existing Conditions - Year of Opening Five Years Beyond Change of Land Use e. If appropriate, state traffic control warrants (e.g. stop sign warrants, signal warrants): f, Summarize local accident history7 (only required for access to principal and minor arterials): 1 Available upon request at City of Edmonds Development Services Department 2 Available upon request at City of Edmonds Police Department Revised on 6124110 E82 - Traffic Impact Analysis Worksheet Page 3 of 5 5. TRAFFIC VOLUMES Provide the following and other planned development traffic within the city-' a. Describe existing ADT and peak -hour counts (less than two years old), including turning movements, on street adjacent to and directly impacted by the project. b. Describe the estimated ADT and peak -hour counts, including turning movements, the year the project is fully open (with and without project traffic). c. Describe the estimated ADT and peak -hour counts, including turning movements, five years after the project has been fully open (with and without project traffic). d. State annual background traffic growth factor and source: 6. LEVEL OF SERVICE (LOS) ANALYSIS a. Summarize Level of Service Analysis below and attach supporting LOS analysis documentation. Provide the following documentation for each arterial street or arterial intersection impacted by ten or more peak-h.our trips. Other City -planned developments I must also be factored into the LOS calculations. LOS MMM LOS Existing Conditions Existing Delays Year of Opening With Project Without Project Five Years Beyond Change of Land Use With Project I I Without Project I I b. Note any assumptions/variations to standard analysis default values arid justifications: 1 A list of planned developments are available at the City upon request for public records Revised on 6124110 E82 - Traffic Impact Analysis Worksheet Page 4 of 5 7. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the Edmonds Road Impact Fee Rate Study Table 4 (attached) and as identified in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC 18.82.130. CHANGE IN USE Fee for prior use shall'be based -on fee established at the time the prior use was pennitted. If the previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04), the 2004 ECDC 18.82.120 impact fee shall be used. ZeAi units I "s, ITE Land Use Category Per Unit squar ect, U -e Fee Rate # of elling, vf1p, etc. New Use $ X IPrior Use Hbm�$ X I AP\ New Use Fee: $ Frior Use Fee: M "'NEW DEVELOPMENT Units in ITE Land Use Category Per Unit square feet, Fee Rate # of dwelling, vfE, etc. New Use $ X MITIGATION FEE RECOMMENDATION: S INDEPENDENT FEE CALCULATIOW $200.00 (+ consultant fee) S TOTAL TRAFFIC IMPACT FEE I $ I City of Edmonds, EngNee�ing DivisliMApproval , 'No impact' fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative. Revised on 6124110 E82 - Traffic Inipact Analysis Worksheet Page 5 of 5 9 Imp d., 'bW 2009.-. a Fe'e...R*-Ta! ei .. ......... ... .. .. irdmond�Strwfs and Roads Impact Fee Rcle Study TABLE 4 IMPACTFEE RATES -- (1) (2) (3) (4) (5) Trip ITE ITE Und Use Trip % New Lenp Net New Trips per hpact Fee Per Unit La -oda cataeory Ratez TOW Factor4 Unit of Measure $1,049.41 per Trip 110 Ught Industrial 0.97 100% 1,47 1.43 1.000 sq ft 1.50 per square Mot 140 Manufacturing 0.73 100% 1.47 1.07 1,000 sq ft 1.12 per square Not 151 Wril-warehouse 0.26 100%. 1.47 038 1,000 sa ft 0.40 per square foot 210 Sin& family House 1.01 100%1 1.13 1.14 dwelling- 161 W.33 per dwelling unit 220 Apartment 0.62 100% 1.20 0. 74 dwelling 776,56 per dwelling unit 230 Condominium 0.52 100% 1.15 0.60 dwelling 629.65 per dwelling unit 240 Mobile Home D.5b 100% 1.09 0.64 dwelling 671,62 per dwelling unit ZSI Senior Housing 0.16 10096 0.93 0.15 dwelling 157.41 per dwelling unit JZQ Motel 0.47 100% 1.27 0,60 mom 6Z9.65 per room 420 Marina D.19 100% 0.18 berth 188.89 per boat berth 444 Movie Theater 3.80 85% .0,97 0.73 2.36 1,000 sq Ft 2,413 prr square fbot 492 Health/Fltnos Club 3.53 75% 1.00 2.65 1,C)OO sq Ft 2.78 per square foot 530 High School 0.9� 80% I= 0.78 1,000 sq R 0.82 per square foot 560 Church 0.55 10096 1.20 0.66 1,000 5q ft 0.69 per square foot �56S-Day-Qpre -Center- 12.46 75% 0.67 1 6.26 1.000 Gq ft 6.57 per square foot LJOZO,Nin ln�:Hqine 0.22 100% 0.87 0.19 bed 199.39 per bed : . . . . -11 General Offte 1.49 90% 1.47 1,97 1,000 sq ft 2.07 por square foot 'dffliie 3.46 7 50A 1 �40 3.63 1.000 sa It 3.81 per sQuare foot '014 Sp6clawRetall., 2.71 55% 0.69 1,000 sq it M3 per -square foot 820 Shopping Center 3.73 65 A .13 1.28 1,000 sq ft 1.34 per square foot 850 Surenmarket 10.50 65% 0.67 4.57 1,000 w ft 4.80 ger gquare foot i 852 Convemianco mkt 3457- - 0.40 5.53 1,GCO sq ft 5.80 per square foot 15-16 twurs 912 Drive-in 4ank 26.82 55% 0.47 6.67 1,000 5q ft 7.00 per squ2re foot 932 Re3tmwant sit- 11JS 55% 0.73 4,48 1,000 sq ft 4.70 per square foDt crown 1 933 Fast food, no 26.15 50% 0.67 8,76 1,000 sq ft 9.0 per square foot dlive-up 934 Fast food, wl 33.84 51% 0,(j2 100 1,000 sq ft 11,23 per square foot drive -up 936 Coffse/Do= 40.75 20% 0.67 SA6 1,000 sq ft 5.73 per square foot Shop. no -drive -up 938 Coffee/Donut 75.00 20% 0.67 10.05 1,000 sq ft 10.55 per square foot Shop, drivL-Lip, no Indoor seating 945 Gas station 13.38 45% 0.53 3.19 vfp 3,347-62 per vfp5 w/convenlence 2 ITE Trip Generation (8th EcTition): 4-6 PM Peak 14ourTilp Ends -1 Excludes poss-by Pips: see "Trip Generation Handbook; An 17E PrIoposed Reconrimended Proofte" (1988) 4 Ratio to average trip length. 5 vfp: vehIcl a fuelng position menciotson, CltV of Edmonds, Washinglon Young & Octobei 291,2001? Company EFFECTIVE 5/1/2010 Page 21 e 3 of 4 Revised on 6124110 E82 - Traffic Impact Analysis Pag 2004 - Impact Fee Rate Table t-dmorids RocfdImpac I Poo R&j a Study I TABLE 4 1 IMPACT FEE RATES (3) (4) (G) Trip ITE r1*E Land Use Trip Now Length Net Now Trips per Impact Fee Per Unit @,D $ Code catuoEx Rate Trips' Factor' Unit of Measure Er. ni 110 Light Industrial oza 1 Do% 1.5f) 1.56 1,000 sq ft 1.19 per square foot 140 Manufacturing 0.74 100% 1.59 1.18 1,000 sq ft 0.90 par square foot 151 mifll�-Warehouse 0.26 10096 1,59 0.41 1,000 sq I't j3er sguare, fGat. 210 Single family 1.01 100% 1.03 1.10 divelling $40.77 per dwelling tailt House 2?0 Apaftment O.�Z 100% 1.15 0.71 dwelfing 1 544.49 per dwelling unit 230 Condominium 0.54 100% 1.15 0.62 ftellinn 474.24 per dwelting ustit 2-40 Mobile Home 0.56 100% 1 1.09 0.61 dwelling 466.14 per dwelling unit 310 Hotel 0 . G) 1 100% 1.25 0.76 room 58229 per room 1320 Motul 0.47 '100% 1.25 0.59 room _ 448.65 per room 420 Marina 0.19 1 DO% 0.97 0.18 berth 140.74 per boat berth 430 Golf course 0.30 1 001ya 1.00 0,30 acre 229.10 per acre 444 Movie Theater 3.80 100% 0.72 2.74 1,000 sq ft 1.36 r*r square foot 452 11-acquat club 1.83 100% 0.97 1.78 3,000 scl ft 3.58 Fer SCIUM fGDt 530 High School 1.02 1001/9 0,62 0.63 1,000 sq it OA8 per -9quare foot 560 Church 0.66 100% ills 0.76. 1,000 sq k 0.58 per SqyWa foot 610 Hospital 0.92 100%1 I.SG 1.44 1,000 sq ft 1,10 pet, square foot 620 NursIng hame 020 100% 0.87 0.1-7 b2d I 32,8H per bed 710 6eneral Office 1.49 100% 1.59 2.37 11,000sci ft 1.81 per square foot 720 Mmical office 3.66 100%1 1.50 5.49 1,000 sq ft 4.19 par square foot 820 Shouping Center 3.74 81W 0.40 1,21 1,000 sq it 0.93 per square foot 832 Restaurant,, sit- 10.8G 56% 1.00 6.45 11,000 s(I it 4.92 per square foot dMil 833 Fast f nod, no 26.15 52% - 0.62 8.43 1,060 sq ft loot 6A4 per square A drive -up $34 Fask food, w/ 33,48 51% 0,62 io.59 l,000 sq rt 8.00 per square foot 4rive-up 844 Gas. station 14-56 60% 0.53 4.63_,pump 3,535.82 T VfP 045 Gas station 13.38 47% 0.53 3,33 pump 2,S45.26 per vfpl w/converflence 850 Supermarket 11.51 SS% O.GS 4.11 1,000 .5q ft. 3,14 per square foot 851 Convenience 53.73 39% 0.40 8.38 1,00D sq ft 6.40 per square fool market-Z4 hr 1-912 Drive-in Bank 54,77, S11%, 0.47 13.13 1.,000 sq ft 10.03 gar square foot ITF Trip 0 eneration (6th Edition): 4-6 PM Peak Hour Trip Ends Excludes pass -by ITIps: see 11tip GeneTation Handbook: An iTE Prorjosed Recommended Practice" (1906) 4 Ratio to, average trip lengih. v1p: Yet -de lueling position Hendeison, City ot Edmonds. Washington Younf, & Apill 15, 2003 COMPOny EFFECTIVE 9/12/2004 Pago- 16 Revised on 6124110 E82 - Traffic Impact Analysis Page 4 of 4 STREET FILE �Of,' 775-15,8� SEP 2 71985 ADULT RESIDENTIAL TREATMENT FACILITY ,HYDRAULIC CALCULATIONS SURVEYING ENGINEERING . PLANNING 9-19-85 85-4021 MANAGEMENT /A -i4 657 Ott %A L" #A u - 0 xxx #A 0 4A coo A A A ARF,A /�--Aes Ojo (f 1000 I> Fo P-e- s r �v- q S- 141A)P ZT yk S4 r CIA- 0.10 x /,q,5- A 0. 0,5-0 -c4s T7-S- 7-5' G�o 579.'30 4341T 4o,QoT T + Z�G- A S.-�3 (591, ID) 4- V5 V C T- Y% 0. SO "K \VT co 0 &A�,.s CAm mol 0.306-1 VZO !�� �3f O.Zo - 0. S-G Ave-, C.= '50- M'?"i:tA Cl -7 - I-` - GR j N-C-1 L.1 CPtf-U G 40 711 03 LU w IS UA x I x wl 'A "' 000 on 0 a - t4 ; eq v -!qt A A A C4 r4 C4 V6 b F- Pp-ov I t>eb ,p I P F, Y5Tem o trc> op- I r- I C"F- S/Z-C- - 0.-6z A17-3 k V4 P�, -0 . IT T 2. Ar im� Ir t/2) L F�r w ot /� = a VeA- v r- op-Ir-le's - 0. 4M.V 0 — 0 v t*-r- Lo vi So &,xeA-*-ep- rA-" 2.5- TDr OF C-v P- 6 47-4,75 0-4- e�ft o,+ vie!j- eA,� To p Ir- wes,7- cx, 24 - -15- L,D W Ito DAIVeWA-1 (,"s-r 4ZS-0o U, I TV., w to- V(S c44-Af-6 F- -rC> ST-R&,P-T- Ir Sro 0- n, 9-Y, cee C> s Pe-s-rp- 1 crac oveAr-Low, P IILPM(I\ C- ZJD L A,.5r 0-51 UA I" M x x C, cc vi !0 (4 " .......... . El6a- Usitie We,, P- 15LO vi :r—r AZq.-iT-4Z4SO zT -P+ vo. G?e 0,Z7 c�s It- 6..,Scs ftr),VL Q.e . = 0. . I ,Do ui s 16 Pot- �G?p A ct o D- /I Te- 6" 4 7M 0. 15, (p A-DS ZO)o = 0 , q3 k V4 61m, 4",5, -C . B.� c 11 ==CoMm"MMOOM: I c I SM as On us On on on =20212911111511, ME Is sollms 0001111 oil, loll 221111111101 1 IMMINNIIIIIIII on momill I 00111111111111 so 111111111 WAM --.,w,.mwmmm i�am�m�m FA �VAML,-'Mm Mon nwjoo�� Mr �� �ld M WA CITY of EDMONDS E I VED S I D E SEWER PERMIT FU_�nspectiog Cal 3202 C V 14, 1 Q PERMIT NO. T b d P �n Address of Construction: Property Legal Description (Include -all easements):' OA YIA BALLINGER LIE1 STAT Owner and/or Builder: Contractor & License No: Singl:e Family Residence Multi -Family (No. of Units Commercial .(No. of fi,xture.'Units Invasion into City Right -of -Way: No Yes (If Yes, Right -of -Way Construction Permit required. Call Ond-Call-Cerite.r (1-800-424-5555) before any excavation.) Cross other.Private Property: No Yes AIf Yes, easement required, attach legal description and cou�ty easement number.) PLEASE READ THE ITEMS LISTED ONTHE BACK I certify that I have read and shall comply Date with the items listed on the back. Permit Fee: Trunk Charge: Assessment Fee: Issu.ed By Date Issued:, Receipt No.: Partial Inspection: Comments Final Inspection Approved: Date initial co Rejected:. CD Reason PERMIT MUST BE POSTED ON JOB SITE White Copy. -,File Green Copy Inspector Date Initial Date Initial Buff Copy - Appli'cant The City of Edmonds Side Sewer Drawing EASEMENT NO - -------------------------------------------- NEW CONSTRUCTION REPAIRS El LID NO. W.O----.,ASMT. NO - ---------- ------- OWNER SRQ!��Q-WT)/ l4OOSl-t4-G --- A.v7rAoRA:Ti CONTRACTOR DA --- G ---- BRCJK--VA-0-C ----------------------------- PERMIT NO. JOB ADDRESS2,0-9-0-3 --------- LEGAL DESCRIPTION: LOT NO. --------------------------------- BLOCK NO - ---- -- *-SAUINGER --- V-4 V =1 L�IFFTr STATION --------------- ------------------------ ------------------------------------------------------------------------------------ ---- G: z 1.5,0P. PWW-"1-1 1175 (REVA 1/78) Approved: .Y ----- - --------------------- - 1- .8-6- By - ----- - ---- ;9/ DAI E, Odl�t-ly, -1 - ------- --- CITY OF EDMONDS DEPARTMENT OF BUILDINGS CERTIFICATE OF OCCUPANCY UNIFORM BUILDING CODE, Sec. 306 20903 70th Avenue West )ancy established by this certificate: R - I Building Permit Number Fire Zone Type Const. V-lHour #860634 No. Stories One Rn Q­­ f Loacl signs . in place (per Sec. 2308 U-B.C.) — Capacity signs — posted (per Sec- 3301 (i) U.B.C.) Floor load and room cal5aril), sigiis, when required, must reinabi posled it/ (Ifl Jillies. Adult Treatment Facility __ HAS BEEN INSPECTED AND APPROVED AS COMPLYING WITH PROVISIONS OF THE EDMONDS BUILDING CODE AND WITH UNIFORM BUILDING CODES. Issued this Twenty-Nin h (lay of June 9 37 CHIEF BUILDING OFFICIAL By J-1 OLAORk M - — (�� !rtificate shall be posted In a conspicuous public area and shall not be removed, mutilated or obscured and shall be main- tained in legible condition at all times. Any change of occupancy requires a new certificate. s N% 10M "4 , \ "a, Mc TO I g - � 205 USE PERMIT N UMBER CITY OF EDMONDS zo CONSTRUCTION PERMIT APPLICJ�TION JOB ADDRESS 7e NAME *A NAME OIF U—N-41 _?d-70-3 19W- Housins! Authority of I Snoh. Couiity L AL D SCRIPTION CHECK SUBDIVISION NO. MAILING ADDRESS 3423 Broadway TELEPHONENUM 14 PUBLIC RIGHT OF WAY PER OFFICIAL 3TAEET MAP. CITY 259-554 EXISTING REQUIRED DEDICATION Everett PROPOSED_W___ -ME K. o n Jones DOAQ, Architects, PI.S. RIGHT OF WAY CONSTRUCTION PERMIT AEOUIRED II/ STREET USE PERMIT REQUIRED 1.1 ADDRESS 3224 Wetmore ___37 — SEE E GINEERING MEMO DATED— 2g4�Kg N( NU BE SEE PIW DEPT. REVIEW CHECK LIST DATED-- t I zbv- F11r,44- AETER SIZE IV, 11 sE NUMBER IS L FITrL10EVSE .6MBER PRV UWMED c SIGN AREA ENV. R VIEW ALLOWED PROPOSED COMPLETE EXEMPT Of H—ease.,_ients VARIANCE OR C U see attachment ;11041 z OAT T' Lo�LOT COVERA E z I,— 4jr 004"11-01 51 NEW 'S'O'"TIA Li PLUMBI N 0 ADDIALTER �NONMESIEL.T.AL ED MECHANICAL REPAIR RETAINING WALL 0 SIGN FENCE CHECKED By T_�PE OF Lou EXCAVATE OR FILL I x FT) _X_ — I VADV VL 1144 DEMOLISH r-1 PRE -MOVE INSPJ swim POOL SPECIAL INSPECTOR REQUIRED AREA OC UPA"Cy GR UP JOCCUPANT LOAD L_J COMPLIANCE INSP. 0 YES NO El El WATER LINE REMA�KS Z SIDE SEWER 74AM41, TIVSUL 17 ELO SM4e_ 64 f46y Ccpw,�— El NUMBER OF STORIE 21 beds fiAz 12e,,r,1AM10 d*.k- 61301A, NATURE OF WORK TO BE DONE JATTACH PLOT PLAN) Construct a 20-bed Adult Residenti VALUATION FEE Treatment Facility (A.R.T..F. CHECK FEE 625%00 on�rlinq house for BUILDING 0 menta lly ill 2�jrsons. Approx.* PLUMBING S,000 S.F., single story, wood fra MECHANICAL This Permit covers work to be done on private property ONLY. GRADINGIFILL An const ruction or, the public domain (curbs, sidewalks, YE 1.50 r veways, marquees, BIC.) will require Separate permission. d i nergy Code Fee Perrnit Application: 180 Days Permit Limit: 1 Year - Provided Work is Started Within 180 Days "A icanl,,O betnalf ol nis or ijor spouse, heirs, assigns and pp' n lan Check Dep. 00 F surc 's inity, defend and hold _ es. ilt!erest, agrees to indem its harmless t a Ci y of Edmonds, Washington. officials, and ag nts from any and all claims for damages 0 employees, whatever nature. arl sing directly or indirectly !.om the Issuance of this perrnit. Issuance of this permit Shall not be deemed to modify. waive or reduce any requiremen I of any city ordinance nor limit in any Way the City's ability to enforce any ordinance TOTAL AMOUNT DUE -0 provision." I hereby acknowledge that I have read this application; that the ATTENTIO N APPLICATION APPROVAL information given is correct; and that I am the owner, or the duly a . uthorized agent of the owner. I agree to comply with city and THIS PERMIT This application is not a permit until stale laws regulating construction; and in doing the work authoriz- AUTHORIZES signed by the Building Official or his ed thereby. no person will be employed In violation of the Labor ONLY THE WORK NOTED Deputy: and fees are'paid. and receipt Is Code of the State of Washington relating to Workmen's Compensa- . acknowledged In space provided. lion Insurance. INSPECTIO14 DE!>ARTMENT SIGN' U4 V­113ATE �GNED CITY OF EDMONDS OFFICIAL'S SIGNATURE �11 771-3202 ATTENTIOW, E) OR OCCUPY A BUILDING OR STRUCTURE /Y';E 31*1�11� DATE IC1 -Eyr, IT IS UNLAWFUL TO US A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR ORIGINAL — �ile YELLOW — Inspector _j UNTIL A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. . U13C �K -- Owner GOLD —Asses."r CHAPTER 3. '0? 73 0 C13 \A �A V CIO 0 CD CD I I C P"L-E Line Type Area (square Feet) Exempt -Exempt Replaced New Total Replaced +New (Non -Exempt) F4. (add numbers in blue boxes) �._ 0 —1 A, V_ EA - Z-4/3 & -7 Stia, f=-r, _ SU i L:bi Lt'<:1-Ev_vI6v5 EX,51t,. is L-'t:>& I Mc L 0 - H G SQ 1-11 aL. 10 - iA - 332. S�CLI ir- �y 4,.( L�;4 'I /\UALY _!& GL 10. IiA t>R IV _F0 _rp� I v 1/ 4 Z-7 s n 7 U_T_ 1Kr`i_0 SEC 20 TWP 27 RGE 041H PTN E1/2 SEI/4 SIN114 DAFODM ATNEGDR0FSDSF1/4SW1/4TH S02*46 23E ALG E LN OF sD smw mFr-TH SWi-22 07W 672.13f-TMlAP 1OFT-E OFW LN E1/2 SEI/4 SW1/4TH S02*33 23EALG E LN 0FPR1Y 00MV TO SNO OD RECAF NO L399049 DIST357 42FTTAPTHAT BEWS S99*22 07W FRSW CDR LOT 12 PLATOF HoyrACRESTpBTH �� 07E 223.23FTTApjH4T BBM�S NO2*33 23W FRS%N 0DR LOT7 PLATOF HOffACRESTH S02*33 23E 12MTH SB9,� 07W 22323MAP 1OFT EOFW LN OFSD E1/2 SE114 SMATH NO2*33 23W 12WM TPBB(CW20FFDiOF(AJ;CRAHSEBEMPrWASr C= C"4 �­C' Ui LU CD :=!a rA .4!1 ISI yfw (,-TOR GOVAIROL .3 4S I_rF_ FL -A" POCK 7-0 C1 0 16OZ-0 -r/�,� 4' 2:7 0 1- 2- 0 0 0 3 0 Z.7 0 0 -z -r14 V A:r> 10 :S S sa_F� i . % 712- SrL. I. 'Z-7 "':: Z-Co L S TA, <-- r-- V—_ IWIL) 0 b A1:_T I MA loft Is fo JC MAD '0% tj n'EET FILE r,?V& 8�� S-5 o?of,03 7ov-'- Ar- IU A-Abfflbr� STREET."FILE 514t Pla 0 OCT 2.7 2010 WILD/Al ury GOF FDMej�.� Z- 0 3.t2- :S 4!1 sIA, .4 (o, - C)o 5 Z_ -0 S-r Ik-k 6, f=,O. C_ I L_ I F1 fi� ­4� A4, APLr-1 & r- I 43 e 9:1 A '\zt-P&6v -rc>cKFI dA J 5 10 IC 0'/ 1 0,-q� Z-4 IMI Vs. Z11 'Do 6 St FEOCS 0 L Z) 17-1 L w 4!' U t 15 v 4 ,,DB PIOE CAt>. N4, E.-rS it I M C.S NOV 3 0 2010 BUILDING DEPAUMENT C!Ty Or- EDMOMPS - -. k"= Z_ 0 1 , C_ P�,L_F_ LLine F eet) Type Area (square Feet) Exempt 0 Exempt Non -Exempt n_Exem t j Replaced New Total Replaced +New (Non -Exempt) -�I (add numbers in b I I 2z. CS) OR -T -e r. Ij G, P, k IC>_K v [.-i v) C, rT P� %J JZ 2- 0 -5. zz 1 -11 - P, 6W E 9, \/,6. 1.1 LI 0 -T- A, V, F-A, — z 4/ 3 & -7 f:-F iSu i L:t:,i i�Ac- c-\/sz S7j33 Z_ S0,.Pr, 14 W�FEKVICU5 CAL-C—S', ED 7 C) 9 0 3 — —IF \JJ, EX I MCI L. 0 - H AS Z., SQ. v —1 , w 0-T- v WID, X. S�M 'D R I v L / -1- —7 -F 0 -r A, L Z_77 S G) - 4t -700 Z_-7t),j 4o00307 -TIE _r_>0\,Jv_ASr.0U-T- IKr�-o V_00v- I> F_ A� I �.A GKA��Ikd-cf-- -T I -Z_ _s a. P�r-T-, -Z 7 (o (f:- g &, \&J L S 'P 0 U " b A-T 10 t� SEC20TWP27RGE04TH PTNEl/2SEI/4SWI/4DAFa)MATNEcic)RoFsDsEl/4swi/4,THS02*4623EALGELNOF SDRjBMV3WrlliSB9*no7W672.13FTMTAploFTEOFWLNEI/2SEl/4SWI/4THS02*3323EALGELNOFPRly rTI0az-'IL EF-DS(Okl coNvYD To sNo cio REcAmo 1399049 DiST357 42FrTAPTKATBBk96 S89*22 07W F:RSW CDR LOT 12 PIATOF FKYVTACRESTpBTHNN*2207E22323FT7ApIMTBEARSNo2*3323wFRswaxLar7RATOFHCPITACRESTH WE�E-f> S02*3323El2WTTHS89*UO7W22323FrWlOf-TE(jFWLNOFSDEl/2SEI/4SM/4THNO2*n23Wl2OFM TPBEXCW2WFfHOF(AMMHSEBE4P-rWAST-FEG#093M-003) (IN --r- 5, 1 3> I 1- 0 F —1 H'F- ST 0 F_rA_\�j PzMr— ?'A"b"90 t-k_- V 4-Am IYXEA)fj�-e� &v,- *M I5I_=G7_5r__FI'6II9A_vr= 15Hr__E_r, 02ANA46G; I irxKp - r roLrl W/ ON T R.. -t to AVoid damagie 0 On"'.. o r the -Ontram or T ela he -000.utr40tor shall g t.j nOt I imit-0-0 to. tele �J, -ft- _�U phone, pg_ --sk r r P4. pose of 0 Ong Or r to coustruotion. 14 �lt TNT- WOP 4LAd g A es abiall mot be. �A ff" and po ur ng Of _4 9 :40 4A w. o's must b. 0. 140 6 t tt, a6 Ax"'I IN 4 NO ­4 NO, th 3 AE P, Oak t WAAWW' b 06�4t, on 4 4. NAM; t tp 0 Satisf -aO WK COO and the 31 aeted w M 04. 4,149 1, z- .4-6 M N, 9�, # Aw Over -z 0o, P., "w. i'�': %t t add MT -, P KIWI MIX- Ml �,__ 4 d W A "", 14�01_ g. Im b 'Ll 1�.A­�* _31", A.- 011- -0-F gg,-pm FIP7140,m NO gi, a M 2, r -7'.7 7. �:777�7 A-4 �,M. H�. TOR _429_12 - l.r=. 41 -1 - c5b 7 -MP 42-5. 1:t -2 422.2 6" Mirwrimum U�IOOMFIC FCUNof%­/ N�';�:5. --IMT W)4erle nlFW:ZT L GRAVEL COMTRUCTION ENTRANtE "6T Yl !STC-C-1- PUICre TOP OF C:,P-ATr:: eL 425,7t -TO P1140io -&—weLb TA155 Ab li Lila ��Mmmr=NT C>I* FL^TE _LIAS RQ' CAPAr, T'� *1 WRe:N 15 DOW N' AN 0 WeLDC-D I IZ 4L LAWDet� U r, I C-ASCAtur- Wl�_Vepvf (7ATe C/61 I -Lb W"5, 07PICAL) ur) t:qulv. . f4r IN MW, 17, e Xg D fA N_ AN PLA.TV-- w., .......... Fwg- Ta'cimf 6f%055. :1. P W. [61 A\M- AL4 TtL- It AN jilteJ5, AMCOATC-V Ne 'Row. r-xettl­r�- L i v j ED Ixslr W. GROUN 4-1 _444P� T_ w Z.— Sm R " G UNDW 0 'N COPOtR' CDMED Vf 4-- R FT.'. ..Z M. W KRE 1.4 % W_ -SE __7 -7,777,77 A. 0111.0 Ol C> ------- C14 co 0 cm Cc$ IL CD 0 7T �4 L (W E5 C_ e. 4(" IZ 111,4 D /+ �O 0 4- -4 /0 llffli A Ito 01 -T ovr 47 Iry I 7�7 Z9 T� 4-2 �5, A+ clJ TYre I N TA KE % uj T F%A-6" 5CME-et-4 TOP 42 5-15z, IM 7 0 t Z_ Elf-115T. &FIC)UNI WW 424.15cl- 19 SC 422 00 20 VAULT/FAD N 0 LOPIIZOP AL PM 1, F4 zu. w 'IT air AF W*T 'T z 4 I CITY OF EDMONDS BLDG. DEPT. CONDITIONAL PERMIT WORK- 5,1rZ_ 46y- 41411� ADDRESS- 76,74S W'- W- W OWNER- 1W APPROVED DATE - BY BLDG. OrrICIAL KEEP TZESE STAMP�ED OB'I 01 04 � PLANS ON JOBSITE FOR A I SPEJT1O S LL INSPECTIONS.. PERMIT NO. SHEeT OF a T__F a at 7�4 �6 L.-T � . 4V 1 t_� 64. NO --TYPICA4- Cal4C, W^LK V/,( -jot t4-j IX Z)4 WC), A,647�� To (N,,�i r7r-, tA ON L�Y d L P L T17 z 11 6 t�A4-,(v' \�5/ A(vNAL-7 +1 c0MFA(,TF_C) Cpu-�:,Hu) gify-K 6ou pe-ze_ j��gj�L-) F-z4N< �LIN G;Z&/F_L_ I qL .............. ----------- -------- 1 - General Contractor shall verify all dimensions and coordinate the work of all trades involved in the Project as part of this Contract. 2. The Contractor shall verify conditions at the site and report all discrepancies to the Architect before proceeding with the work. 3. General Contractor shall provide a complete and proper execution of the work �,., indicated on all drawings. if error in layout.. dimensions.. or details are found between Architectural. Structural. Mechanical, Site Developement. or Electrical drawings, contact the Architect immediately -before proceeding. 4. Regulations, standards., construction. materials. and requirements for installation of materials shall conform and be governed by the 1982 edition of the Uniform Building Code, and its amendments. issued by the City of Edmonds. 5.1 Referencing of drawings is for convenience only and does not limit application of any drawing or detail. 6� Materials.and finishes listed in Room Finish Schedule are for general information and convenience of Contractor, in addition*to materials and finishes indicated or specified eleswhere in the drawings. 7. Dimensions shown on Floor Plans are to face of concrete. to face of interior finish, exterior sheathing or to grid lines. 8. Height dimensions ar& given to the finished concrete floor line or to top of plywood subfloor and exclusive of floor underlayment and finish material. 9. Protect shrubs and trees designated to remain from damage due to the work. Remove and stockpile topsoil where new work occurs. for use later in new planting areas. See Sheet SDI.3 for Landscaping Plan. 10. 11. See Sheet,SDI.2 for Utilities, Site Retention and new Grading Plan. LEGAL DESCRIPTION OF RECORD That portion of the E half of the SE quarter of the SW quarter of Section 20,, township 27 North, Range 4 East, W.M. , described as follows: Commencing at the NE corner of said SE quarter of the SW quarter; thence 52' 4623"E along the East line of said subdivision, for 30 feet; thence 589* 22'07"W for 672.13 feet, more or less, to a po . int 10 feet Ea I st of the West line of the East half of the Southeast quarter of the Southwest quarter; thence 502' 33'23"E along the East line of property conveyed to Snohomish County, Washington by Quit Claim Deed, recorded under Auditor's File No. 1399049, a distance of 357.42 feet to a point that bears 589* 22'07"W", from the Southwest corner of Lot 12, Hoyt Acres according to the plat thereof, recorded in Volume 16 of Plats, page 26 records of the Auditor of the County.of Snohomish, State of Washington, being the true point of beginning; thence N89* 22' 07"E 223.23 feet to a point. that bears N2*, 33'23"W from the Southwest corner of Lot 7. Hoyt Acres; thence S2* 33'23" East 120.00 feet; thence-S89* 22'07"W, 223.23 feet to a point 10.0 feet East of the West, line of said East 1/2 of the Southeast quarter of the Southwest quarter; t1i6nce N20 33'23"W, 120.00 feet to the True Point of Beginning. EXCEPT the West 20.00 feet thereof. SITE AREA 24,387.6 SQ.FT. GROSS BLDG AREA 5,010.0 SQ.FT. PARKING REQUIRED 7 STALLS PARKING PFOVIDED 7 STALLS ZONING GENERAL COMMERCIAL OCCUPANCY R-1 CONSTRUCTION V-lHR SEISMIC -ZONE 3 BLDG. CODE U.B.C. 1982 EDITION Flo 7 . it NORTH IM SD1.1 SITE PLAN, SHEET INDEX, GENERAL NOTES, PROJECT DATA, LEGAL DESCRIPTION SD1.2 UTILITY PLAN, GRADING PLAN, SITE DTLS, NOTES SD1.3 LANDSCAPING PLAN;.SITE DTLS, PLANTING SCHEDULE Au_� TZ C� M 3: or M C 'rE XJ TZ Jzk. r1a A1.1 FLOOR PLAN, FLOOR PLAN NOTES, FINISH SCHEDULE/KEY, DOOR TYPES/SCHEDULE A2.1 BUILDING ELEVATIONS, WINDOW SCHEDULE A3.1 BUILDING SECTIONS, WALL SECTIONS, CONSTRUCTION NOTES ROOF PLAN, REFLECTED CEILING PLAN, DOOR TYPES AND SCHEDULE A4.1 DETAILS A4.2 DETAILS A5.1 INTERIOR ELEVATIONS AND DETAILS- A6.1 MASONRY ALTERNATE: PLANS, SECTIONS, DETAILS AND NOTES E3 Ir 1=_1 TJ r1_1 Or TJ i=p_ _zk r_S S1.1 FOUNDATION/FRAMING PLAN, FOUNDATION DETAILS, STRUCTURAL.NOTES S1.2 ROOF FRAMING PLAN, SHEAR WALL SCHEDULE, FRAMING DTLS M1.1 HVAC PLANS, PLUMBING PLANS, FIXTURE AND EQUIPMENT SCHEUDLE M r-a J_:P (,- r-r TZ 3: C; zk 1. E1.1 SITE PLAN, PANEL SCHEDULES AND RISER DIAGRAM E1.2 LIGHTING/POWER PLAN AND FIRE ALARM RISER DIAGRAM ch U) CM a) .0 -cr) C Lcts Vu CD 0 E (D 04 C%J z 0 F- O_ Cf) W LU _7 F- 0 LU 0 cr 0- CD W F_ 0 z W LU In z F_ r z _J (L LU 0 F_ 0 - C0 W-I, Cc: .7 n 0 -0 -C CTJ -0 0 -0 ITH) VAL 6 -TH) 55 M dl [?'�p 5<�Z L41 Q_�_- M EEiJ —1 TOP A,24. itp I -e - 421 .,c)5 MATCH C-X. r. r__416� W/ GENERAL NOTES 1. It shall be the responsibility of the contractor to avoid damage or disturbance to all existing utilities. The contractor shall. contact all utilities Including but not limited.to telephone., power, sewer, water, -gas, and cable TV for the purpose of identifying the correct locations prior to construction. 2. Manhole, inlet and catch basin frames and grates shall not be adjusted to finish grade until just prior to.paving and pouring of concrete curbing. 3. Storm water retention -detention facilities must be constructed and maintained in accordance with City of Edmonds requirements. 4. Provide and mai ' ntain the temporary sedimentation collection facilities to insure sediment laden water does not enter the natural drainage system. These faciliti * es must be in operation prior to clearing and building construction and satisfactorily maintained until construction and landscaping are completed and the potential of. on -site erosion has passed. 5. All disturbed areas such as retention facilities, roadway back -slopes, etc. shall be seeded with a perennial ground cover grass to minimize"erosion. Grass seeding will be'done using an approved hydroseeder or as otherwise approved by the Public Works, Department. 6. All dimensions -are to center of catch basins unless otherwise noted. 7. All wor.k,and,materials shall be in accordance with the latest edition of the Standards and Specifications for City of Edmonds and APWA, and any requirements established at City Hearings. 8. All catch basin and inlet grates shall be d F-presaed 0.10' below pavement level.. 9. All R/D pond ­berm construction to be monitered by Geo-Techni,cal�Enlgineer. Berms to be compacted to at ,least 95% of the maximum relative density as determined by Section 2-03.3 (14) D of the Washington State Highway Department 1980 Standard Sepcifications. 16. its-L.L. 1 ­%1- 0MP%TT=- - 5c-)4v5-W5-L T09 4 2 5. 1 :t C).r-. 42-4-50 I.e. 42-2.2-2 N 0 - 5L-W�) - Y-41-, - L_ OrY­6ml Ivyl-lerie— (;)Pe C't'je e:obr= oi- &fL"CxTe Ift"5Tc-E-L PLA-Te TOP OF CvP,,N-Tr= r--L. 4-Z5.-i t MOVr--ME�-NT 6" MIN or P%_ATC- 41_10. 4" E:L,=424.50 AS RQ -2100 L15 CAP4.C.t T-/, CoLAe-y- \A/"e:IN,I c7AITe 15 E>OW N D %Nr_L0r-_0 trpo r_fkP1MC_, _-5TANOM-0 tc C/C/I-Lb 12"(� 9 C-INW. LPXMF) or) tQCII,�01 4:17-.7-z C\J PAD \U1 3'X 3" HINGED AND SPRING[", 60T WO I LE I 51E5'; C)IA. LOCKED ST EEL PLATE IN P1_JkTE: VVELD 42 To CM P H-20 LOADING c-f2A55 C\J 4' X 42",X 61 1< 6J42 VAULT NOM' ALL bTtE:L- FNrS"r,5 At -AV 5LMFrA6 "_ MUell M (e>cCePT Ur>) .PRIMARY FFEED C .. 4 _1" P N T!5 GROUNDWIRE- 15' OF #4 BARE SOFT DRAWN COPPER COILED IN VAULT rp ----------- GRAVEL CONSTRUCTION ENTRANCE MIf?IFI IDOX OR equiv. *z 27 - 14 ePA.WELDC-P7_.\ WIRE FIE:Nr-r= >LA 4!' )TAND4RV CA: VWJA-5 CP OR aETTER PEP`, 6?,AV&L NORTH 'u""' r% �Iluulu uc nl!jnu V Ulan poinE a PROPER PLACEMENT OF A FILTER BARRIER IN A DRAINAGE WAY S d4ltl, 69 -7 CAf <5 -VIAL 4V5 MRS rD_34,6*bFf OR 0 ryplcwL 7-R4sp srREE-,41 t4.W L. - 424,55 t:;, PAD (E5 X561 X y W/ 12-11 424 ,Z41 5/81' X 61011 GROUND ROD- 422 INSTALL 12'1 BELOW GROUND LEVEL VkLJ L-T/F 0 15 10 15 20 AC) NC77F,� 25 50 '35 50 tprn 40 1515 45 &5 10 1. PAD SHALL BE LOCATED ON COIMPACTED AREAS AND SHALL OVERHANG THE VAULT EDGE POND 5ECTION A ­,A. AS DESIGNATED BY THE DISTRICT'S ENGINEERING DEPARTMENT. THE CUSTOMER SHALL PROVIDE AND INSTALL A MINIMUM OF 15' OF IDENTIFIED AND 1/t;' - C-O" HOI;NIZONTAL = V- 0" V E F�T SEALED CONDUCTOR PER PHASE INSIDE VAULT. I CAL 3. ALL HOLES NOT USED SHALL BE PERMANENTLY GROUTED. GROUNDWIRE- 4. ALL INSULATED CABLES ENTERING THE VAULT SHALL BE PROTECTED BY A PIECE OF #4 BARE SOFT PLASTIC DUCT. THIS DUCT SHALL BE PERMANENTLY GROUTED ON THE INSIDE AND DRAWN COPPER OUTSIDE. GROUTING IS ALSO REQUIRED AROUND THE GROUND WIRE. CONTINUOUS 5. ONE (1) GROUND ROD IS REQUIRED FOR VAULTS IN THE RUN AND, FOR VAULTS AT THE WITHOUT SPLICE END OF A RUN. TWO GROUND RODS WITH A UY 19) 9nnT 4-ZI7DADATTnM SECONDARY FEEDS 61 - 6. CONDUIT SHALL ENTER VAULT IN SUCH A WAY AS NOT TO INTERFERE WITH OTHER Vsj L-7 PA �-�D CONDUIT ENTRANCES. 7. BELL ENDS ARE REQUIRED ON ALL CONDUIT RUNS. OL 1.0 C\I C14 C\I CY) co V3 > Cc$ 0 E C\I C\J ce) LL. 0) z z 0 LL —J W -Z W Z�, + O'co CC Cf 0 + co 4r ZZ cy. z � 0 Lu"o- 0 C\1 -dis CO 06 W \J cc E,0 U! _J Z. > > z 0 11 CO- W_ 0 z ell _J LLr Cf) z 0 z 400 41 1.1 0 k" z C4 > 0 0,00 0 _J ZZ., a. CI) I 00 F- _J, 4- C: 0 0 Wz C: L) ca -0 I �­ 17 CD r- CD CD * > z 0 0 :3 CD T X z N . . . . . . . . ..... ... T71 11j)-L 9NI':50N > z -1S1AVZi9 C::I?tl--7V//\A k9N I 476�� 14 CD IM 0 CD r Ti rt _L,:;OJW(7� _40,117, (2j- �-aJV da.L.NVIA 4V NA-CHS, J-GN CNV -A2om -tRmL �c si-mr SHJ_ NIHIIPA evr'�* IIV :40 ;z ai\rz�r2s=6 (-;j-jcm �o Imil -jalric F -J� I. oz.01mo -ro� cvv ?g '1^77t.LN079 e;P1H1 NI --,dOA VJV-X�'NVI -40 101� I, 7tl_ 64 '4SI SHJ Oj. Y4*�NO`) 1-:t,5qx4N CINI ';;�OM SJV-)1�16NV1 TIV J.0 N HIHON (ss) dwo>iAn-] :r7nNn-21J 7nNn ri JOIN 1110 Q 1, 17 411 14 P\ SLD 77, ---------- 00 .o -Z 00, .e r A_ + t -AP -5.0 + k,,! - + + V V1,20a",Lirl `�;` I . � X_x 4- -1v--21JV1 '-ilvIl d71111 *,, 1 + C? 1�7 -z. -�ONIVI V7N)A 4- + 4 71 4-SNV 'NIVJ Qe S-IV j 0j. tG V� 4.. 1W.) PC V\Vi*AV" 411191-so--) + -,5 + + + T11 + J*N I->Vk­ + A j."r 6*% * -?. * +, + + + + s 6 * + + + + + + "A. .41"a� C7 'vNciavw ve wrracivn�H v,4P117W1V3 tsarw '0 z + + + ..#. s SLON .%Jul r-I + + > Mold HOLLMO />kV.Sl A119 40H-i + + + z c < m M m ;,,ON AN 3, m y a a!�Vv. W MIV_W3�i CIL 'VT-40-Aavyv "U < P m z =r > "V11W CP 4 CO) (D .0 x m vm-�,Vj-? v "nil CA ......... %R m 0' > t t c __4 0 -eo 43-,/. /)*.AnzvII;si�\ Av + + + ............ 4 + m + z 'Oel (Z) + m v)eq�� 'Oot6 + z 0 ID CO 1T1 NlvViS-4 cL 0 cocmFoa 117, > rt7 CD 3 0 CD # CD :3 SION CD 141"0 /L CD Ire- 77/ CD -.0wo so N IVMd Yf4O1JcVW loot — am% . — _s -------------------- 0 -------------- - ------ - --------- ------ 00 -------- (D rQ -J M x 4, A M Y-2)_-� M M /M T tn r L I z[ m1k I'M I V)I RECEIVED MAR 4 1986 ENGINEERING I U C? a) f) �.M. H� d tr) TDP 429. 17 C\I co LM Cz 2t V4 4- :3 + + + A > M 0 (I) E C\J 000 22 7. 2- > ki 1 0, MA vd JI W A Ex. C.b. F7 To P 425-40) A,W c2cr < 2 C C's 0) cc It 0//� E .0 A I _J Ne -0 4 2 7- 0\0 tO, C + + 401 LIJ V4 4 E== _J .00 + 01 t-C)OT I rl-4&5 7 CK �Y + xZ­ WN. A,� Ilk) N LOP 6RkTe - 5455 -X� Loop TOF A 2 4.15 10 1 YJ0 ... . .... 0. If I V=-. A22.2E> IZ4 /0, 11 7x w L,1 "4A 55 —4 C 4�_ 6N % A, t J, 'I �r AOL 1000 V> C). 5o ffl 0.50070 77 TOP 4*24. 1 (P I e. 4*21-95 MATC-H C-X. i.e. - -15 L k V 'JZ"-5TeEL FLA,-Te 0F%P%TF- - !t>94;;5-W5-L_ To;> 4z5-1 t D.F. 47-4.50 t.e. 422.,2--2 GENERAL NOTES 1. It shall be the responsibility of the contractor to avoid damage or disturbance to all existing utilities. The contractor shall contact all- utilities including biit not limited to Lelephone., power, sewer, water, gas, and cable TV for Lh(-- purpose of identifying the correct locations prior to construction. 2. Manhole, inlet and catch basin frames and grates shall not be adjusted to finish grade until just prior to paving and pouring of concrete curbing. 3. Storm water retention -detention facilities must be constructed and maintained in accordance with City of Edmonds requirements. 4. Provide and maintain the temporary sedimentation coliection facilities to insure sediment laden water does not en�er the-, natural drainage system. These facilities must be in operation prior to clearing and bui,lding construction and satisfactorily maintained until construction and landscaping are completed and the potential of on -site erosion has passed. 5. All disturbed areas such as retention facilities, roadway back -slopes, etc. shall be seeded with a perennial ground cover grass to minimize erosion. Grass seeding will be done using an approved hydrosbeder or as otherwise approved by the Public Works Department. 6. All dimensions are to center of catch basins unless otherwise noted. 7. All work and materials shall be in accordance with the latest edition of the Standards and Specifications for City of Edmonds and APWA, and any requirements established at City Hearings. 8. All catch basin and inlet grates shall be depressed 0.10' below pavement level. 9. All R/D pond berm construction to be monitered by Geo-Technical Engineer. Berms to be compacted to at least 95% of the maximum relative density as determined by Section 2-03.3 (14) D of the Washington Stat.e Highway Department 1980 Standard Sepcifications. 87j"E 1" T F UD I OL'f Nlf'l(, FCUNDF-)-/ No. 5c)4�5 - Orf'-6t_-'T W"E�-nr-- PPe?'JItJt1 lf�, IDIF�EGTL,-/ 0\lef� L_at�or=Fj j� JZ, IN, kt� I C?�Jr= '/Z"5Tr_-Et PLA-TE TOP OF (�P­ATe E-L - 475.1 (A5PH j%L-T TRe4­1 - ME-NT I k--\Nr::LID'TAI5t) Alj NE:(_E65Pf-),f �To A,�,JoItD MOVC-MeNIT OF PUATC- tUD. 611 MIN �V-O,F- E:L.=4-24.;�t AS RQ CV41�IM , ZOO Lb CAF),,,c t T-/ , d J \4*'1PE:NJ L-IF-f &Aja 15 DOW 0 N I P, N D V�[-_LIDC-D 'To rF-J1,Me, __-5TA-N0AT`)D 1��AI_V. LAt)DeF,, UF:1 fAle C1611-Lb 6A,6C4,,Ut CUL_Ve;-,-T OF,) tQ0I\,J. LO IV' P co 60T Wot_� - I Ere)'; DJ,-\. IN PLATe 6 VVELC) To CMP C-f,\055. (\J 4211 NOM '. ALL 5TtL-I_ PPF�Xt> ANV Mulo-T t�e_ bAL\/pm- I-Ito AND COP,TC-o \N 1A1-,FVAP6__T NAtNrf Q Of'� tu-lTeFN (E-Y-CePT LID) D 42 C'MP N T5 V__�\ b -eo All- 1) GRAVEL CONSTRUCTION IIIT100CE L 11t�Y JOZIT C6WZ11Y6 z wl�,f,11,846f UEWLY 6f�J�H) C?- FiL_-mP_ FAzz-c '2'4 4!' H G P C5Q aE:TTF=R a C_ . Tlc)�J 4�c;` __ __ __ TOP -4Z5-r_)c> I.e. 4-22--is Pldn A A Elevation Points A StIoul d hi9her vian point 8 1 PROPER PLACEMENT Of A FILiER BARRIER IN A DRAINAGE WAY E%1,11�77. CnF�CDUMD L. 424-- r7 C:1 I . V= . 4 NORTH 412 0 15 10 15 50 55 40 4.5 5.12 1515 tvc�l —0-- JAW— gk -4 CO 1- 04 > z co Z Go �i C: 0