20904 74TH AVE W.PDFIIIIIIIIIIII
5869
20904 74TH AVE W
:=o9.ITY OF EDMONDS
PUBLIC WORKS DEPART 0 T
0A
IVA
04
04
�4
04
0
W
SIDE'SEWER PERMIT
FOR INSPECTION CALL Permit
775-2525 Ext. 220 Issue Date
j _ jg
* PEP -MIT MUST BE POSTED ON JOB SITE *
1. Address of Construction
2. Property Legal Description (include all, easements)
3. Single Family Residence AV Multi -Family No. of Units
Commercial
4. Owner and/or Builder
5. Contractor & License No. L_ LA-T T_
6. Invasion into City Right -of -Way: No-.)—< Yes (If Yes Right-of-
way Construction Permit Required Call Dial Dig (342-5344) before
excavation) .
7. Cross other private property: Yes No Easement required
attach legal description and county easement number.
READ THE FOLLOWING AND SIGN:
a. Property owners must obtain a permit to install side sewers on
their'Property. A licensed side sewer contractor must be employed to
construct side sewers in the public' right-of-way.
b. The side sewer contractor assumes full reponsibility for each
installation for one year.
C. Commercial establishment requires a minimum of a six inch (6")
side sewer line.
d. Side sewers may not be installed closer than thirty inches (3.0")
to any structure. 0
e. Side sewer lines must be laid at'a minimum grade of 2% (1.15
and maximum grade of 100% (450). 0
f. No turn in side sSwer greater than 45 (1/8,bend) is 0 allowed
between cleanout. All 90 turns must be constructed of a 45 (1/8
bend) and Wye with removable cap.
g. No down spouts, footing drains or'floor drains can be connected
to side sewer system.
h. Pea gravel is required for bedding when installing sewer lines
through other than granular soil.
i. Cleanouts are required at 30"-60" from each plumbing exit line
and at minimum intervals of 1001 along sewer 'line run.
j. Trenches within City right-of-way must be restored to original
conditions. Contractors shall be responsible for right-of-way failure
due to poor compaction of fill.
k.- Side sewer must be left uncovered until inspected and approved
by the City.
1. Inspection during normal working hours only. Two (2) working
days notice required.
DATE:
1-dertify-that I have read
and shall comply With the above
PERMIT FEE: 30,00 i I (- 112
DISAPPROVED BY': Date:
r-0 B Y-�: Date:
CONNECTION FEE: c.7,S,00 APPROVED By:"j 2:2�Date:
P4
0
44 PERMI I T MUST BE POSTED ON JOB SITE
M
0
Co
NOPCE: NO WARRANTY OF ACCU e formation sho on
attached map
r Was ComplIed for use by the City a Edmoid i,'-, C4-',�S
mi?V
M
3
0
cull, consultants. - the OtY ol twonds does no
set forth on the map. Anylpmersomnor
'ilsl
warrant
ftyrequS�..
-j
conduct an Independent InquIry rmegaarding
g
e Inforaji2icj r" 21
M
th r',zo, Including, but not Imited to, the loc
'Sucli
!on of any
Sii'L ..:: sewer Stubs may or may not e)dst
0 8XIst en
th. lo-z�uan shown, Neither the City of Edmon
may or rr--) 1-.
its
be liable for the -Information given on
I
nor- or,,.;'
1�
is map, nor f cr
or--., -
re-r'lsen'awn provided based upon sald m all
7-:od /'P V
71
4 81 :0
I
0 Tj
Z
Z
>
>
H_
z pri
0
z
2
z
M Cn
CL
M
0
.z CA
0
z
OR
M
z
0
49 STREET FILE 4*
CITY OF EDMONDS HARVE H. HARRISON
MAYOR
200 DAYTON ST. - EDMONDS. WASHINGTON 98020 - (206) 771-3202
OFFICE OF,THE CITY ENGINEER
February 17, 1982
Martin E. Bahr
20904 - 74th W.
Edmonds, Wa. 98020
Dear Mr. Bahr:
SUBJECT: SANITARY SEWER CONNECTION -209.04 74th W.
I received your letter requesting a delay in making
your sewer connection and am sorry that we were not more
explicit in explaining this requirement during the annex-
ation and LID hearings.
Due to the reasons stated in yo * ur letter, we will de-
lay this requirement until August 1982. When the sewer con-
nection is made, you must either remove your septic tank, or
pump it and fill it with sand.
If you have any further questions, you can call me or
the Building Department at 775-2525, extension 258.
Sincerely,
AJR___�ADAMS, P.E.
City Engineer
JEA/st
cc: Building Department
Dt
Rho d-a M�a.rc�h
Go
i,
P-,�A-07/
W-2
LJw% ,
A .17
/0, 0/0);
I A
3b 7,7
,4� &-wa—
ODO 2 j)
RECEIVED
JAN 3 0 1082
Dir. Ot Public Works
00
go 110_�/
STRE rf--T FILE
CITY OF EDMONDS HARVE H. HARRISON
MAYOR
200 DAYTON ST. 9 EDMONDS, WASHINGTON 98020 - (206) 771-3202
OFFICE OF THE CITY ENGINEER
December 21, 1981
1
Mr. Martin E. Bahr
20904 74th Ave. W.
Edmonds, Wa. 98020
Dear Mr. Bahr:
SUBJECT: L.I.D. 206 - SANITARY SEWER CONNECTION
City of Edmonds records indicate that you are the owner
of property. located in the College Place Area, and that the
sanitary sewer service is now available to your property.
Residents abutting this sewer main are required to be connected
per Edmonds City Code (18.10.010).
In -consideration of the completion of the sewer system and
the aforementioned code, you are hereby advised that you should
make arrangements to make the necessary sewer connection within
sixty (60) days.
If you have any questions, please contact Jerry Saterlie
at 775-2525, extension 259. Permit and connection information
may be obtained at the Building Department, at 505 Bell Street.
Sincerely,
JAMES E. ADAMS, P.E.
City Engineer
JR: jky