Loading...
20911 82ND AVE W.PDF111111111111 �581 20911 82ND AVE W t�'C I T Y�- Permit No-. .vP,F EDMONDS ZA COMMUNITY. SERVICES DEPARTMENT RE.CZ, ve D 4 - cl RIGHT-OF-WAY CONSTRUCTION PERMIT Iswe Date AL)a Z 0 W V) U W 0 V. Washington Natural Gas Company A. 0 Owner: r-NMVP �Wmercer Street t6Qractor: Name Mailinp, Address Mailing Address Seattle WA 98111 GW.R� City State Zip C_ City State. Zip PAV State License Number Telephone Number C. 9 Address or Vicinity of Construction: .20911 82 Avenue West To Inst 11 2" PE IP Main in.82 Avenue West. Per Addached Type of Work to be Don Drawing: 812-524 (IR 6043-3) (1) D. 0 Work in Connection With: El Sub or Plat 0 Sing le Family El City Projects El Commercial El Multifamily 0 Utility E. 0 Pavement Cut: XY 0 N . F. 0 Size of Cut: — X APPLICANT TO READ AND SIGN INDEMNITY: Applicant understands and by his signature to this application, agrees to hold the City of Edmonds harmless from any injuries, damages, or claims of any'kind or description whatsoever, forseen or unforseen, that may be made against the City of Edmonds, or any of its depa'rtm2nts - or employees, including or not limited to the defense of any legal proceedings including defense costs, cd .('�osts n,,at(6—hiey fees by reason of granting this permit. THE CONTRACTOR IS RESPONSIBLE FOR . R MANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL INSPECTION. AND ACCE.PTANCE OF THE WORK. Estimated restoration fees will be held until the final street patch is completed by City forces, at which time a debit.or credit will be processed for issuance to the applicant. • A 24 hour notice is required for inspection; Please call Engineering: 771-3202 • Work is to be inspected during progress and at completion. • Restoration to be in accordance with City Code. • Street to be kept clean at. all times. • Traffic Control to be in accordance with City regulations. • All street -cut ditches must be patched with asphalt or City approved material prior to end of working day; NO EXCEPTIONS. I understand the above and that this permit must be available at the job site for inspection purposes at all times. Signature: Date:' March 29, 1991 Owner or Contractor This Permit Must be Posted at the Job Site For Inspection Purposes Call DIAL -A -DIG Prior to Beginning Work APPROVED BY: IT141 Time Authorized: Void after —JUNF— 67 days. Special Conditions: m A PERMIT FEE: Restoration Fee: Receipt No.: — Fund I I I Fee: Street Cut Dimensions: — x = $ RELEASED BY\-,\ Date q__ INSPECTED BY Date .NO WORK TO BEGIN- PRIOR. TO PERMIT ISSUANCE,. rrig, Div. March 1989 FIELD INSPECTION NOTES (Fund I I I Route copy to Street Rept.) �4 Comments: Diagram: CONTRACTOR CALLED FOR INSPECTION 0 YES Partial Work Inspection by P. W.: Work Disapproved By: Date: FINAL APPROVAL BY: Date: 0 NO Eng. Div. July 1985