20912 72ND AVE W.PDFiiiiiiii iiiiii
14970
20912 72ND AVE W
CITY OF EDMONDS
PUBLIC WORKS DEPA14WNT FOR INSPECTION CALL Permit N? 6686
CI
PU
S DE SEWER PERMIT 775-2525 Ext. 15iw Issue Date
PERMIT MUST BE POSTED ON JOB SITE
1.
Address of Construction se jF
ado-Y.1cZ
7,,2nei 10.
2.
Property Legal Description (include
a11 easements)
3.
Single Family Residence V"" Multi -Family
No. of Units
LL.
Commercial
4.
owner and/or Bui lder
5.
Contractor & License No. cny)
ex",
6.
Invasion into City Right -of -Way: No L.--#�Yes
(If Yes Right-of-
way Construction Permit Required -
Call Dial
Dig (342-5344) before
excavation).
/
7.
Cross other private property: Yes
No
Easement required -
attach legal description and county
easement
number.
-1
I READ THE FOLLOWING AND SIGN:
L
a. Property owners must obtain a permit to insJkL 'de sew rs on
Juniffl; to
their property. A licensed side sewer contractor m Ite3ap-Lu
construct side sewers in the public right-of-way *
b. The side sewer contractor assumes full rep9MLYPUlGach
installation for one year. 1-800 -562-6478
c. Cov.mnercial establishment requires a minimum of a six inch (6")
side sewer line.
d. Side sewers may not be installed closer than thirty inches (30")
to any structure. 0
e. Side sewer lines must be laid at a minimum grade of 2% (1.15
and maximum grade of 100% (450). 0
f. No turn in side s8wer greater than 45 (1/8,bend) is 0 allowed
between cleanout. All 90 turns must be constructed of a 45 (1/8
bend) and Wye with removable cap.
g. No down spouts,. footing drains or floor drains can be connected
to side sewer system.
h. Pea gravel is required for bedding when installing sewer lines
through other than granular soil.
i. Cleanouts are required at 30"-60" from each plumbing exit line
and at minimum intervals of 1001 along sewer 'line run.
j. Trenches within City right-of-way must berestored to original
conditions. Contractors shall be responsible for right-of-way failure
due to poor compaction of fill.
k.. Side sewer must be left uncovered until inspected and approved
by the City.
1. Inspection during normal working hours only. Two
(2) working
days notice required.
DATE: RE-CF-1VED
-"certify that I have read
and shall comply With the above
EPERMIT FEE: 0-0
ow *Tnt M K 00
eeNNrie-TieN--Pm:
* PERMIT MUST BE
DISAPPROVED BY: Date:
By: -Date:
APPROVED By: Date:
ON JOB SITE
§5CITY OF EDMONDS
A - FOR INSPECTION CALL Permit H1101 006010
RUBLIC WORKS DEPARTMENT
SIDE SEWER PERMIT .775-2525 Ext. 2-�2,0, Issue Date - A//
,1* PEP -MIT MUST BE POSTED ON JOB SITE *-4
ss
1. Addrie 0 onstruction
s, 4ol,
2. Property Legal Description (include all, easements) VIA BALLI
LIFT STAT!IONE
L 3. Single Family Residence W111 Multi -Family No. of Units
Commercial
[Uj 4. Owner and/or Builder V
5. Contractor & License No.
6. Invasion into City Right -of -Way: No 61-11"Yes (If Yes Right-of-
way Construction Permit Required - Call Dial Dig (342-5344) before
excavation).
7. Cross other private property: Yes No / Easement required
U attach legal description and county easement number.
READ THE FOLLOWING AND SIGN:
a4
a. Property owners must obtain'a permit to install side sewers on
>4 their property. A licensed side sewer contractor must be employed to
construct side sewers in the public' right-of-way
b. The side sewer contractor assumes full repdCALLAI�=each
installation for one year.
BEFORE
C. Commercial establishment requires a minimum or a AORAG(6
P4
side sewer line. 1- 800-562-6478
0 d. Side sewers may not be installed closer than thirty inches (30")
U
to any structure. 0
e. Side sewer lines must be laid at a minimum grade of 2% (1.15
0 and maximum grade of 100% (450). 0
E-4 f. No turn in side s8wer greater than 45 (1/8,bend) is 0 allowed
between cleanout. All 90 turns must be constructed of a 45 (1/8
bend) and Wye with removable cap.
g. No down spouts, footing drains or floor drains can be connected
to side sewer system.
h. Pea gravel is required for bedding when installing sewer lines
through other than granular soil.
i. Cleanouts are required at 30"-60" from each plumbing exit line
and at minimum intervals of 100' along sewer 'line run.
j. Trenches within City right-of-way must be restored to original
conditions. Contractors shall be responsible for right-of-way failure
due to poor compaction of fill.
k.. Side sewer must be left uncovered until inspected and approved
by the City.
1. Inspection during normal working hours only. Two (2) working
days notice required. x
DATE:
I-'beftify-tRat I have read
and shall comply With the above
P. 'PERMIT FEE: DISAPPROVED BY: Date:
1-4
/.,- (", r) B - Date:
-CONNECIT-10N�FEE: APPROVED B Date
94
0
44 PEP.MjT MUST BE POSTED ON JOB 'ITE
k
Side Sewer Drawing
The City of Edmonids EASEMENT No . ............................................
NEW CONSTRUCTION REPAIRS E] LID NO. Z�2.4—..ASMT. NO . ..................
OWNER. ........................................................ CONTRACTOR ....... 0 .................................................... PERMIT NO.
JOB ADDRESS ....... --- — --- 7?,....vV ........................... LEGAL DESCRIPTION: LOT NO . ...................................... BLOCK NO . ....................................
..... ........ ........
......................................................................................................... .............. .. VtA--lBA-LLINGER--
LIFT STATION
NAMEOF ADDITION .............................................................................. I ........................ z ...........
Nr
Z-1 --:3
�L C
Q
c) cz. sz.= 0
(,I C—q = C5
ci 't,� co
=j -1-t P — ct)
7Z-LAI/ Approved:
PWW-0001-11/75(REV.11/78) D A T E .., ........... By,,,4� ..... .....