Loading...
20920 HILLCREST PL.PDFIIIIIIIIIIIIII 11680 20920 HILLCREST PL RECEIVED "EET FILE JAN 3 1 2012 EDMONDS CITY CLERK 1111111111 ti tult 2 PGS 1212al2o9flm 16am SMOHOMISH CUTY - WSMIGTON Return Address: City Clerk NO EXCISE TAX City ofEdmonds REQUIRED 121 - 5th Ave. N. Edmonds, WA 98020 DEC 28 2011 UTILITY EASEMENT KNE SIEVERS, SnohoWsh Counly Trewer By KIRKE SIEVERS - Property Address: None Assessor's Property Tax Parcel Nos.: 00373600500713, 00373600500714, 00373600500715 IN CONSIDERATION of benefits to accrue to the grantors herein, the undersigned, Daniel Eagle and Kimberly Eagle, hereby grant to the CITY OF EDMONDS, a Municipal Corporation, a permanent easement for the installation, construction, operation, maintenance, repair, reconstruction or replacement of a waterline conveyance pipe and necessary appurtenances, over, across, through, and below the following described property, and the further right to remove trees, bushes, undergrowth and other obstructions thereon interfering with the location, construction, operation, maintenance, repair, reconstruction or replacement of said waterline conveyance pipe and necessarV appurtenances together with the right of access to the easement at any time for the stated purpose. The easement hereby granted is located in the COUNTY OF SNOHOMISH, STATE OF WASHINGTON, described as follows: THAT CERTAIN PRIVATE ROAD OVER LOT 7, BLOCK 5, ALDERWOOD MANOR NO. 9 DESCRIBED AS THE SOUTH 50 FEET OF THE EAST 135 FEET OF T14E NORTH 330 FEET, AND THE WEST 50 FEET OF THE EAST 135 FEET, EXCEPT THE NORTH 280 FEET THEREOF. The easement area is depicted in the drawing attached as Exhibit A. THE CITY agrees to restore to substantially the original condition such improvements as are disturbed during the construction, maintenance, and repair of said utility or utilities, provided the grantors, their heirs, or assigns shall not construct any permanent structure over, upon, or within the permanent easement. DATED THIS STATE OF WASHINGTON) )ss COUNTY OF SNOHOMISH) DA F Di ielEagle Kimbeily Eagle On this day personally appeared before me Daniel R Eagle and Kimberly Eagle, to me known to be the individuals described in and who executed the within and foregoing instrument and acknowledged that they signed the same as their free and voluntary act and deed, for the uses and purposes therein mentioned. UNDER MY HAND AND OFFICIAL SEAL THIS '1W'DAYOF_jW-2— 201 t BRADLEY A BERGET NOTARY POLIC in and�Wr the NOTARY PUBLIC State of Washington, residing at STATE OF WASHINGTON MY COMMISSION EXPIRES 01-18-15 EXHIBIT A MAIN ST CL C4 w a u Lot 7, Alderwood 110902 Manor No. 9 20914 Easement 0105 21109 21113 0 0 Z :D N TO SCALE 1-02 VI-12 Pilchuck Contractors, Inc. Job #107017156 13 July 03 Sheet 1 1 J. Buss National Barricade Co Notes: 1. All signs and spacing shall conform to the MUTCD and City of Edmonds specs 2. Alert offected residents 3. Channelizing devices are 28" traffic cones. 4. Maintain a 16'driving lane on pavement for vehicles. 5. All signs are 48" x 48" B/O unless otherwise specified. 6. Work zone is 369's/o c/I Main ST & 1 Ve/o c/I Hillcrest PL Main ST -------------- --0- -.)0- CHANNELIZING DEVICE SPACING (FEET) TAPER TANGENT 20 20 LEGEND WORK AREA 28" TRAFFIC CONE EXISTING TRAFFIC FLOW 'SZ SIGN LOCATION PROTECTIVE VEHICLE OR WORK VEHICLE A ;s.., ""INC. CONSUL 1�256 NE 201h�S=16­ Bellevue, WA. 98005 (425) 747-5618 FAX (425) 747-8561 Subject: Geotechnical Engineering Study Proposed MackResidence 21OXX Hillcrest Place Edmonds, Washington Dear Mr. Torina: PERmi-r COUWER STREET FILE We are pleased to present this geotechnidal engineering report for the proposed.Mack residence to be constructed in Edmonds, Washington. The scope of our work, consisie.d.of exploring site surface and subsurface conditions, and then developing this report to provide. recommendations for general earthwork and design criteria for'foundabons and retaining walls, You authorized our work by accepting our proposal, P-4160, dated February 7, 1997. The subsurface condibons of the proposed building site were explored with two test -pits that encountered about 4, feet 9f lbpsq, weathered soil oveflyl. g :dense n The proposed ri�,sJdpnce`%canib;d. supported on,:996 itIona*I:footIng,s_:0,0, TAP" ded: into,", I Aw qu. e. om sk;q ac. a, RX, P.O." men e syste, 9Jree4.r@ npq,ba�41'8 d 4 h JOtS future - Wat6r,.',- ro n 19 pote ble. pritroVrnewspres. can, 0 d M' q��pccornplis,he , ithout adversely i6i#ing Qpes. Due to the moisture sehsiUvity of. the silty, op -site soils, Wet weather ea �iork in`d'.g`iad"!'n­g will likely be more difficult and cody. The attached report. contains a discussion of the study and our recommendations., Please contact us, if there are any questions regarding this report, or If we can be of further assistance during the design and construct.ion phas.es of thisproject. Respectfully submitted, GEOTECH. CONSULTANTS,'. INC.. Marc R. McGinnis, RE. Associate GEOTECHNICAL ENGINEERING STUDY Proposed Mack Residence 21OXX Hillcrest Place Edmonds, Washington This report presents the findings and recommendations of our geotechnical engineering study for the site of the proposed Mack residence in Edmonds. The Vicinity Map, Plate- 1, Illustrates the general locabon of the site. Development of,,th.q,property is still in the planning stage. We were provided with only a topographic map.. that, is, dated August 1996 and was developed by* Reid Middleton. No. detailed plans for the proposed. house or. site gradingvere available at the time of this report. Based on discussions with Jim Torina, we anticipate that a house having two floors over a daylight basement J.s planned to be constructed on the. eastern, central portion ofthe property. The . garage would be accessed from the east, off.the existing asphalt d6veway. The majohty of the property Is to be left undisturbed. SITE CONDITIONS Surface This undeveloped, rectangular parcel: is situat edon t q� q;ton �r -south -of hp,,w r ;Id0..'Qf_lRCrest�P'Ia* Main.��e� . .!The p-roperty has 270. feet of frontage alono'.,.,� sf and.,al ,�5.feet... rO. � Place, I 4pth, I A narrow, asphalt driveway in the Hillcrest Place right-of-way extends along the eastern border of the site. The w easement road.. estern 50 feet f the —d'. ..0 ., site are shown on the. :topographic map that we.un erstan is for access to adjacent western lots. VVith the exception of the eastern 120.1o..3-5, feet of th . 6,'� hq'M'.hWfqf Ahe;.sitp. whichl slopes gently down tot.he west from the asphalt driveway, q 40. 60ig�01.#,down t9.#_g0,;M rwest and�s.outhwest.­ The ground surface Inclination on this steeply sloping, area isZQ_jQ 7,Q,, , p These steep slopes appear to be fairly natural and were,covered with a heavy growth of underbrush at the time of our field explorations. Mature Douglas fir,,q _.fdar and.madrona trees are scattered around this eastern por0on of the prooerty. -easement, have been graded for: access to ��an,,,:adjace'nt;,property.-��Q=Q.a, The road sJtQ 'th majority of thisjq 4;tod..,..a�r:ea',,slopes�g6nUy.down�toward,,ther�r g kpu'th. Along the ea�tern side of the road easement is a ppy.stiopp,cut slope havinq�a hoigh t of up to 204 -.80 to ,Aet and,an IncjjnatiQn,;of, fq@nt. This cut slope is relatively bare. No indications of recent large-scale slope mo%ement or significant soil erosion were observed on 0' the site duri our,visits. It does appear that some.,near�rsurface,.cre.eR��mayl.,.bet�,,o.,p the ly ptIgi W steep�,slopes, and a small amount of4oughing was evident on the steep cut slope* along the road easement. This'slope movement appears to be affecting only:the; looser, -near-surface, weathered soil. GEOTECH CONSULTANTS. INC. �ames'E.Torina Fine Homes JN'97108 April 14,1997 Page 2 Subsurface 7 The subsurface conditions were explored by excavating.two-,--tettgplWat the approximate locations shown on the Site Exploration Plan, Plate 2. The field exploration: program.was-based..upon,,J�e proposed construclJon and required design. criteria, the site topography and access, the subsurface conditions revealed during excavation, the scope of work outlined in our proposal, and the time and budget constraints. Access to the remainder of the site for exploration equip Ment was limited. However, we were. able to observe the soil conditions exposed In the" C'U"t.sId'' POS �alohgl theVestern road,easement. The test pits were excavated on March 20, 1997 with a rubber-bre&bac'khoe. A geot I echnical engineer from our staff observed the excavation process, loggO the telst:�pits, and obtained representative samples of the soil encountered. "Grab" sam pies Qfselected.-subsurface soil.were collected from the backhoe bucket. The Test Pit Logs are attached to this report.as Plate...3. Both of the test pits encountered similar subsurface conditions. Beneath* about 12 Inches of topsoil was loose, weathered, graVelly,silty sand. This weathered soil extended to a:depth of about 4 feet and was very moist to wet. Slight caving was noted in this upper, loose soil,. Below approximately 4 feet, the test pits revealed dense, glacially compressed, gra I velly, silty , sand.,., referred to in this report as glacial till, The glacial till extended to the maximum explored depth of 10 feet. Dense glacial till was exposed in the steep cut slopes on the western side of the site. The final logs represent our Interpretations of the field logs and laboratory tests. The stratification lines on. the logs represent the approximate boundaries between, soil types at the exploration locations. The actual transition between soil types may be,.gradual, and subsurface conditions can vary between exploration locations. The logs provide specific, subsurface information only at the locations tested. The relative densities and moisture descriptions Indicated on the test pit logs are interpretive descriptions based on the conditions observed dudng excavation. The co.mppction of backfillva6, not In the scope of our servicqs. *Loose soil will therefore be found in the area of the test pits. If this presents a problem,'t . he backfill will need to be removed and replaced with structural fill during construction. Groundwater Groundwater seepage was observed in both test pits at a depth of.4 feet, This seepage level appears to represent shallow groundwater that Is perched above the relatively impermeable glacia) till. The test pits were left open for only a short time period. Therefore, the seepage levels on the logs represent the location of transient water seepage and may not indicate. the static groundwater level. It should be noted that groundwater levels vary seasonally with rainfall and other factors. We anticipate that groundwater will likely be found in more permeable soll.layers and between the nea,r-surface, weathered soil and the underlying dense glacial till. GEOTECH CONSULTANTS, INC. james-E.Torina Fine Homes Apdl 14,1997 97108 Page 3 CONCLUSIONS AND RECOMMENDATIONS General Bated on the results of our observations and explorations, It Is our,opirnon that the proposed site development is feas ' lble from a geotec,hnical engineering standpoint..� Conventional: foundadons bea * ring directly on the dense glacial till can be used to support th . e residence,. This competent soil was foun&at-least 4 feet below the existing grade in the test -pits. The floor slla4s.can be supported, on the looser, weathered, nadve soil that underlies the topsoil. Because most of the site is steeply sloped, we anticipate that a "'reasonable u.se*,.exoeptlon will need to be obtained from the City of Edmonds for the. proposed development. We support such an exception, The recommendaflons presented In this report are intended to allow the development without significant risk to public safety, both on and off the site. The.dense, glacially compressed: soil that underlies the 41te:.has: hIgh:1shw:s"ngthPnd-%Is- not. typically 'susceptible to deep Instability, Future soil movement on the steep, undisturbed slopes will likely occur as mudflows, that Will affect the looser, weathered soil, This type of slope movement, which typically follows extended periods of heavy rainfall Is a natural process.that can periodically affect any steep slope underlain by competent soil. Continued sIoughIng..rof.tho_e;�posed4 soil. on. the very steep western cuts can. also be expected. The primary geotec'hnical consideration.: related to slope stability Is the protection of the house from damage due to the shallow slope movement that can be expected periodically in the future. Foe this reason,... we . recommend that the western, downslope, foundation of the house be embedded at leasi.3 feet Into ..the..undisturbed glacial till. This found.ation wall should be designed as a. retaining wal[that extends down from the basement slab and does not rely on the slab for lateral support, The height of this retaining wall will depend on the location of the slab relative to existing grade along the downslope side of the house. For example, if the basement slab is at the existing ground surface elevation along the downslope side, the retaining wall would need to be designed to retain the, ap proximate 4 fe ' et of topsoil.and loose, weathered soil, plus 3 feet of the glacial till. Deck foundations should -not -be - constructed downslope of the house,- unless they are designed to resist lateral soil loads that couldfesult from shallow, slope rrfovement. The proposed development should not adversely affect the sta . bili.ty. of the steep slopes if the recommendaUon of this report are followed.. The site clearing,:.should. be, H rri,40 to.,,,are.aa.1hat-w91 be, developed. If trees are cut down on the slopes for safety reasons, the root system�.,,sh'puld be left in place. No soil or debris should be placed on the steep slopes downslope of the . residence. It is important that the clearing and excavation contractors are made well aware of this. It is often prudent to install a highly visible construction fence along the downslope side of the area to be cleared. The site soils do riot have a high erosion potential on the steep slopes if the existing `,v6get a tive cove ' r is left in place and the soils are not disturbed, We anficipate that typical 'erosion control measures will be sufficient for this project during wet weather. These measures usually include a silt fence along the downslope side of the disturbed area, a rocked construction access road, and temporary cut slopes covered with plastic. Areas of disturbed soil that will not be built on, or revegetated soon, should be mulched with straw for temporary erosion protection. Water from drains and downspouts should not discharge onto the steep slopes, but should be tightlined to a suitable discharge away. from the slopes. GEOTECH CONSULTANTS, rNC. James-E. Torina Fine Homes April 14, 1997 'JN 97108 Page 4 All fill should be properly retained by engineered retaining. Walls. Due to the high. silt content of the sfte soils, and the presence of near-surfice seepage, they will generally notl.ba- usable.. as structural fill. The silty soils could be used for fill under slabs and behind walls if earthwork occurs during hot weather, when the wettei'sbi-Is can be dried prior to compaction. The silty soils are moisture sensitive, making them difficult to grade In wet conditions. Excavated foundation subgrades should be protected with 2 to 4 inches of crushed rock or quarry spalls to reduce subgrade disturbance during foundation construction. Free -draining backfill and waterproofing should be placed behind the basement iWalls to limit the potential for future water problem's In, bolow-grade spaces. Depending on the soil and groundwater conditions encountered during. excavation, subsurface drainage will likely also be needed beneath the slab to intercept subsurface water that bypasses the perimeter footing.drains. Geote.c.h.Consul.tants, Inc. should be allowed to review thewfinal-deve opmpnt..:pk=;to.v fy- od Ahat.the ,recommendations, presented In. this -report are ad pquately addressed In',.the;:deslgm -Such a plan review ' would be addibonal work beyond the current scope of work for this stu dy . and it may Include revisions to our recommendations to accommodate, site, deveo'"p:ment,. and' geotechnical constraints that become more evident during the review process. Conyentional Foundations The proposed structure can be supported on conventional continuous and spread I foothgs-bearing directly on undisturbed, dense, native soil or on. structural fill placed:.�ob,6ve'�,this,-i3ompotpM�,..r.la 'I , tive soil. - We recommend. that continuous and Individual spread footings haveminim'um -,12 and 18 inches, respectively.. With the exception of the downslope perimeter footing, the foundations should. be. bottomed at least: 12 Inches below,the lowest -adjacent.. . finish- groun,"urface for frost -protection. The local building codes different footing should be reviewed to determinelf widths or embedment depft are required, Footing subgrade3 must 136. cleaned".,of.. loose or distu . rbed soil prior to pouring concrete. Depending.upon site and equipmen . t constraints,, this may reqwre removing the disturbed soil by hand. An allowable bearing pressure of 3,000 pounds per square foot (psf) 13.:. 9pPrQ00ate1jqrpfo90ngs supported on competent, native soil, A one-third increase �ln this desi ri� b ri urer.may be .g ea ng -press, used -when. considering short-term wind or seismic loads. For the above d" n crit ria, it is g e anticipated that the.total * post -construction settlement of fooUngs founded on competent, -native soil will be- about oneehalf -inch*, with differential settlements on 'the order -of inch in a distance of 50 feet along a continuous footing. Lateral'loads due to. wind or seismic forces may be resistedby friction between the foundation and the bearing soil, or by passive earth pressure acting on the vertical, embedded portions of the foundation. For the latter condition, the foundatlon must be either poured direcUy against. rela0vely levet, undisturbed soil or surrounded by lev6l,' structural fill. We recommend using t h*e: following design values for the foundation's resistance to lateral loading: GEOTECH CONSULTANTS, INC, jame��Ejprina Fine,. RTes, m7106 Aphl:f4"1997�:' �"Pag6 5 Parameter Design -Value .Coefficient of Friction 0.45 Passive Earth Pressure 350. pcf Where: .1. pcf is pounds per cubic foot. 2. Passive earth pressure is computed using the equivalenFfluld density., If the ground in front of a foundati*on is loose or sloping, the passive earth: pressure given above. will not be appropriate. -We recommend a safety factor of at.least" 1 "5, for A a" pun0jafion's' resistance to ad e v lateral.1o. ing; wh n using.the abo ''a design values, 6�b Selsmi onsiderallons The,sito; Is, -located,within: Seismic, Zone 3, as illustrated -on FlgueO.� NO., J:$-�'.of the-1994,'Uniform Building Code (UBC). - In accordance with Table 16-J of the 1994 UBC, the.site soil profileis best represented by Profile Type S2. The on -site glacial till Is dense and not,susceptible to..seismic liquefacflon. Slabs -on -Grade The building floors' may be -constructed as slabs -on -grade atop native soils that underlie the topsoil, The subgrade soil must be In a firm-, non -yielding condition at the -time of slab construction* or underslab fill placement. Any soft areas encountered should be excavated and replaced with select, imported, structural fill. All slabs -on -grade should be underlain by a capillary break -or drainage layer consisting of a minimum 4-inch thickness of coarse, free -draining, structural fill with a gradation similar to that discussed later in Permanent Foundation and Retaining Walla. A vapor barrier, such as a 6-mil plastic membrane, should be placed beneath the slab. Additionally, sand should be used in the fine -grading process to reduce damage to. the vapor barrier, to- provide uniform support under the slab, and to reduce shrinkage cracking by improving the concrete curing -pro mis. Permgnent Foundation and Retaining Walls Retaining walls backfilled on only one side should be designed to resist the lateral earth. pressures imposed by the soil they retain. The following recommended design paranieters are for,wal(s that restrain level backfill: Parameter Design Valve Active Earth Pressure* 35 pcf Passive Earth Pressure 350 pcf GEOTECH CONSULTANTS, INC. Jam bnna:.flne Homes Apr! 14, 1697 Coefficient of FrIcVon .0.45 Soil Unit Weight 130 pcf Where: 1. pcf is pounds per cubic foot. 2. Active and passive earth pressures -are, computed using the equivalent fluid densities. For a restrained wall that cannot deflect at least 0.002 times - Its height, a uniform.lateral pressure equal to 10. psf times the height of the wall.should be added to the above active equivalent fluid pressure, .,-",JN i9_7 108 :.age bd_ The values given above are to be used to design permanent, foundation' andretaining' walls, only. The passive pressure given is appropriate for the depth of level, structural fill, placed In front of a retaining.or foundation wall only. We recommend a safety factor of at least 1.5 for overtuming and sliding,- when using the above values to design the walls, The.d.esign values given above do not include the effects of any hyOrpatatic prwsurss behind the w;WI§,.,.and -assume that no surcharge slopes or loads, such, -:as, vehiciesi -will �be . :placed,. behind the walls. If these condibons - exist, those pressures should be added Ao the above' lateral soil pressures. Also, if sloping backfill Is desired behind the walls, we will need to be given. , the wall dimensions. and the slope of the backfill in order to provide the appropriate design earth'* ..,,pressures. The; surcharge due to traffic loads behind a wall can typically be accounted forby adding. a uniform pressure equal to,2 feetmultiplied by the above active fluid density. Heavy -construction equipment should not be operated behind retaInIn'g'an'd4:-fbundi , tidn'461ls Within a distance equal :to the: height of a wall, unless the walls are! designed. for�',th lateral o. addl"V pressure§,.Tq4pIting. from the equipment. The wall design% criteria assume - that th�'e 1566kfill will be well-co,m pa ' cted in lifts no thicker than 12 Inches. The compaction of backfill neauthe,*alls should be -accomplished -with hand -operated equipment to prevent, the'walls from: being.overidaded by the higher soil forces that occur during compaction, Retaining Wall Backfill Backfill placed behind retaining or foundation walls . should be. coarse,: free -draining, s ' tructural fill containing no organics, This backfill should contaln.no. more than 5 percent silt Aor clay pardcles and have no gravel greater than 4 Inches In diameter. The percentage of particles passing the No. 4 sieve should be between 25 and 70 percent. If the weathered, native, silty sand is dried and used as backfill, at least 18 Inches of free-�_dralning'. I gravel should be placed against the backfilled retaining walls. Gravel should,be used,for:thO entire width of the backfill zone to 2 feet above and below the Interface between the weathered soil and the glacial till, where seepage is most likely to be encountered. GEOTECH CONSULTANTS. rNC. JameS',E.-:TPrina'F1ne Homes A*prif 14,1 96� 4 T 62�'--'06rpose of. these -back 11 requireme d''; fo' r a nts is to ensure- thati, the--depi re�@, ining' wall.. arenot exceeded. because of�a build-up of hyd 'stotle':pre*.�,s. r ro -p�,bohlnd:'the walL The top '1.2 to 18, Inches of the backfill should consist of a:, � com dd' relatively pa'd impermeable soil or topsoil, or the surface should be paved. Tha g �oun&surface must also slope away from backfilled walls to reduce the p . otential for surface water to percolate into the backfill. The sub -section entitled General Earthwork and Structural Fill contains recommendations regarding the placement and compaction of structural fill behind retaining and foundation walls. The above recommendations are not intended to waterproof the below -grade walls. If some seepage through the walls or moist conditions are not acceptable, damp -proofing or waterproofing should be provided. This cou.ld.include limiting cold -joints and wall. penetrations, and possibly using bentonite panels or membranes on the outside of the walls. Applying a thin coat of asphalt emulsion is not considered waterproofing, but it will help to prevent moisture, generated from water vapor or capillary action,. from seeping through the concrete. Excavations and SI Excavation slopes should not exceed the limits specified in local, state,.and national government safety regulations. Temporary cuts to a depth of about 4 feet may be,.a.ftempted vertically in unsaturated soil, If there are no indications of slope Instability. Based upon Washington Administrative Code (WAC) 296, Part N, the dense glacial till at the subject 'site would be classified asType-& Therefore, temporary cut slopes greater than 4 feet In height In this competent soil cannot be..excavatod at.an inclination steeper than 0 ' 75:1 (HorizontalNorti.6al). Temporary cuts in the looser, near -surface soil should be inclined no steeper than 1: 1 (H:V). The above-recomm ended tempora ry slope inclinations are based on what has been successful at other sites with similar soil conditions. Temporary cuts are those that will remain unsupported for a relatively short duration to allow for the construction of foundations, retaining.. walls, or utilities. Temporary cut slopes should be protected with plastic sheeting during wet weather. The cut s . lopes should.also be backfilled or retained as soon as possible.to' reduce the.poienfial for Instability. Please note -that loose soil can cave suddenly and without warning. Utility co . ntractors should be made especially aware of this potential danger, All permanent cuts into native- soil should be inclined no steeper than 2:1 (H:V). Water should not be allowed to flow uncontrolled over the top of any temporary or permanent slope. Also, all permanently exposed slopes should be seeded with an appropriate species of vegetation to reduce erosion and improve the stability of the surficial layer of soil. Any disturbance to the existing slope outside of the building limits may reduce the s . tability of the slope. Damage to the existing vegetation and ground should be min I imized, and any disturbed a�ea� should be revegetated as soon as possible. Soil from the excavation should not be placed on the slope below the house. and this may require the off -site disposal of any surplus soil.. Drainage Considerationgs We recommend the use of footing drains at the base of footings, where (1) crawl spaces or basements will be below a structure, (2) a slab is below the outside grade, or (3) the outside grade GEOTECH CONSULTANTS, INC. .,T.o.Anj,,:.FJnetHo I me$ g B A P.. do*es not slope downward from a building. Drains should also be at the, base of all backfilled, earth-retainin'g walls. These drains should be sur . rounded by =t.6-inche . s.-of'l-inch- minus, washed* rock and then wrapped In non -woven, gebtextile filteir'fabric'" (10l.rafi 140N, Supac 4NP, or. similar material). At its highest. point, a perforated pipe . Invert should be at leastas low as the bottom of the footing, and It should be sloped for drainage. Drainageshould also be provided inside the footprint of a structure, where (1). a craw[ space will slope. or �be'lower than the surrounding ground surface, (2) an excavation encounters significant seepage, or (3) an excavation for a building will be close to the expected high groundwater elevations. We can.. provide recommendations for interior drains, should they become� necessary, during excavation and foundation constructon. All'roof and, surface water 'drains must be kept separate *from the, 46uindatlon, draln:.� system.. A typical drain detail is attached to this report as Plate 4. . For the best. long-term performance, perforated PVC pipe is recommended for all subsurface drains. 'Groundwater, was observed during our field -work. Where. seepage Is encountwqd �in an excavation, it should be drained from the site by direcdng%, it through drainage': ditches .,Perforated pipe, or French drains, or by pumping it from sumps Interconnected by shallow connector1renches at -the bottom of the excavation. The excavaUon and, site should be graded so that surface water I& directed othhe site an . 0 away from.the tops,of slopes. Water should not be allowed to stand In.any area I where founclations. slabs, or pavements are to be constructed. Final site grading In areas'adjacent to, the house should slope away at least 2 percent, except where th I 'are is,. paved. W e a aterfrom roof, storm water, and foundation drains should not be discharged onto slopes; It should be Ughdined to a suitable, outfall located away from any slopes. General Earthwork and -Structural Fill All building and pavement areas should be stripped of surface vegetadon, topsoil*, orgaplc,�soil, and other deleterious Material. , The stripped or removed materials should'. not. be mixed with any materials to be used as structural fill, but they could be used In non-struct.ural areas, such as landscape beds. Sti*u;tural. - fill Is defined. as any fill placed under a building, Whind.-,permandnt.,..fQtoiNtio'.- ��Ondation walls,* or In other areas where'the underlying soil needs to support loads'. Ail ural. fi.11- should be placed In horizontal lifts with a moisture content at, or near, the optimum moisture: content The optimum moisture content Is that moisture content that. results In the .,greatest, compacted dry density. The moisture content of fill is very important and must be plosely controlled during the filling and compaction process. The.allowable thickness of the fill lift will depend on the material type selectec�' the compaction equipment used, and the number of passes made to compact the lift. The loose lift -thickness should not exceed 12 Inches. We recommend testing the fill as it Is placed. If the fill is not compacted to specifications, it can be recompacted before'another lift Is placed, This eliminates the need to remove the fill to achieve the required compaction. The following table presents recommended relative compactions for structural fill: GEOTECH CONSULTANTS, INC. 'James E Torina Fine. Homes .:,.JN 97108 April 14,1997 Page 9 minimum Location of Fill elacement Relative Complcti2n Beneath slabs and walkways Behind retaining walls Beneath pavements 95% 90% 95% for upper 12 inches of subgrade, 90% below that level Where: Minimum Relative Compaction Is the rabo, expressed in percentages, of the compacted dry density to the maximum dry density, as' determined In accordance with ASTIVI Test Designafion D 1557-78 (Modified Proctor). Use of On -Site Soil If grading activities take place during wet weather, or when ' the silty, on -site Soil is.wot, site preparation costs may be higher because of -delays due to rain and the potenoal need to import addiflonal granular fill. The on -site soil Is generally silty and therefore moisture - sensitive. Grading operatlons, will be difficult during wet weather, or when the moisture content of this soil exceeds the optimum moisture content. The moisture content of the.silty, on -site soil must be at, or near, the optimum moisture content, as the soil cannot be consistently compacted to the required density when the moisture content is significantly greater than opbmum. The moisture content of the on -site soil was generally above the estimated optimum moisture, content . at the time of our explorations. The on-site.sand underlying the topsoil could be used as structural fill under slabs and behind walls, only If grading operations are conducted during hot, dry weather, when drying the wetter soil by aeration is possible. During excessively dry weather, however, it may be necessary to add water to achieve the optimum moisture co.ntent. - - - Moisture-sensifive soil may also be susceptible to excessive softening and "pumping" from construction equipment, or even foot traffic, when the moisture content Is greater than the optimum. moisture content. It will be beneficial to protect subgrades with a layer of Imported crushed rock or quarry spalls to limit disturbance from traffic. Ideally, structural fill that will be placed In wet weather should consist of a coarse, granular soil with a slit or clay content of no more than 5 perce*nt. The percentage of particle$ passing the No. 200 sieve should be measured from that porUon of soil passing the three -quarter -inch sieve, GEOTECH CONSULTANTS, INC. 'James E. Torina Fine Homes April 1401997. 97108 LIMITATIONS The analyses, conclusions, and recommendations contained in this report -are based on site conditions as they existed at the time of our exploration and assume that the.'soil encountered in the test pits is representative of subsurface conditions on the site. If the subsurface conditions encountered during construction are significantly different from those observed in our explorations, we should be advised at once so that we can review these conditions and reconsider our recommendations where necessary. Unanticipated soil conditions are commonly encountered on construction sites and cannot be fully anticipated by merely taking soil samples In test pits. Subsurface conditions can also vary between exploration locations. Such unexpected conditions frequently require making additional expenditures to attain a properly constructed project. It is recommended that the owner consider providing,, a confingency fund to accommodate such potendal extra costs and risks, This is a standard recommendation for all projects, The recommendations presented in this report are directed toward the- protection of only the �roposed house from damage due to slope movement. Predicting the effects of development on the stability of slopes Is an inexact and imperfect science that is currently based mostly on the past behavior of slopes with similar charactedstics. Landslides and soil mo.vemi4nt can occur on steep slopes before, during, or after the development of property. The owner must ultimately accept the possibility that some slope movement could occur, resulting In possible loss -of -ground or damage to the facilities around the proposed residence. This re ' port has been prepared for the exclusive. Use of James E, Todna Fine Homes, the Macks, and their representatives for specific application to this project and site. Our recommendations and conclusions are based on observed site materials, and selective laboratory testing and engineering analyses. Our conclusions and recommendations are professional opinions derived In accordance with current standards of practice within the scope of our services and within budget and time constraints. No warranty is expressed or implied, The scope of our services does not include services related to constructon safety precautions, and our recommendations are not intended to direct the contractor's methods, techniques, sequences, or procedures, except as specifically described in our report for consideration in design. We recommend including this report, in its entirety, In the project contract documents so the contrWor may be aware of our findings. 6DIDITIONAL SERVICES Geotech Consultants, Inc. should be retained to provide geotechnical consultation, te , sting, and observation services during construction. This is to confirm that subsurface conditions are consistent with those indicated by our exploration, to evaluate whether earthwork and foundation construction activities comply with the general intent of the recommendations presented in this report, and to provide suggestions for design changes' in the event subsurface conditions differ from those anticipated prior to -the start of construction. However, our work would not Include the supervision or direction'6f the actual work of the contractor and its employees or agents. Also, job and site safety, and dimensional measurements, will be the responsibility of the contractor. GEOTECH CONSULTANTS, INC. James E. Torina Fine Homes April 14,1997 �aqe I The following plates are attached to complete this report: Plate .1 Vicinity Map Plate 2 Site Exploration Plan Plate. 3 Test Pit Logs Plate 4 Footing Drain Detail We appreciate the opportunity to be of service on this project. If you have any questions, or K we may be of further service, please do not hesitate to contact us. MRM/JRF:ant Respectfully submitted, GEOTECH CONSULTANTS, -INC. �� * �vn-' IC 0- 0 27845 AL Marc R. McGinnis, P.E. Associate 7, James R. Finley, Jr., P.E. Principal GEOTECH CONSULTANTS, INC. =// , 4 of b 9 Fl:A AwQ is L40, Gww m st o"I s & cr DAYTON MAPLE 1.0111 V, m. 23 UNION V, OIL HOW ELL WY WSH Or Hrmocx " , UR -K" I to[ I : 1 0 L� LA -9 L PK 25 -c g 11 BELLA cOOLA ST 006D�, GEOTECH CONSULTANTS 7: -IT. El Hu rT PX IK I I Ift $1 "I tn pt SIT WU w.— I T�j se 51 sw, I"Ill 51 �w I 6T6 w IST 81 AKE PL — srr .. 19Q 1,, ST 5�i CHEW ST T Ax 19VID ST X IA 47 196 ST: SW MELODY Pu E"T DR 0 MIN LEV lik v CWLA ASP R S VIE *2, S X MLNFA Lilv labw ... WY 4 R wy rr IF 20011, $1 CAP IN LEI. til sic I *W r �LEY 24 31 ST A a 19 C'R ST A Y" FX--. PINE RIDGEM px ELL ST AINI _V_ ST V1 To P, PL ALDE� LNUTI 1 .0 CEDA T CIE .L. ly FAA 16 VIRLICE 9� 6 sl UD 1 LLIL LIN Z14TIf pt Its, - V, ri Mli s sw ST[, 30 L ELM ZlVIw It 220TA 1. ST S�W_ rgoL pt C. e6 VICINITYVAP 21*OXX HILLCREST PLACE EDMOND.So WA, ow ft'l 07108 "APR 1997 A.......... ul TP-.1 CONCRETEk k TP-2 LEGEND: 5 APPROXIMATE TEST PIT LOCATIONS GEOTECH CONSULTANTS 174 SITE EXPLORATION PLAN 21OXX HILLCREST PLACE EDMON,I)Sv W.A APR 1997 2 A., U 1W] 10 USCS TEST PIT 1 Reddish brown, gravell ilty SAND,'fine- to medium -grained Y, si with roots, very moist, loose -becomes wet -becomes gray, moist, dense (Glacial Till) I Test pit terminated at 10 feet below grade on 3-20-97. Moderate poundwater seepage encounteredat 4 feet during.excavadon. 1 5 Slight cavmg from 0 to 4 feet. V1 5 Fri, TEST PIT.2 I -Lopsoll witti roots dish brown, gravelly, silty SAND, fine- to medium very moist, loose I -.becomes wet :S -becomes gray, moist, dense (Glacial Till) Test pit terminated at 8 feet below grade on 3-20�97. Slight &wundwater seepage encountered at 4 feet during excavation. No caving. GEOTECH CONSULTANTS, INC TEST PIT. LOGS 21OXX HILLCREST PLAdE EDMONDS, WA Job Nx Date: L 'ad by: to: 97108 APR 1997 1 0% .9 `7 S/ope backtill 17woy from TIGHMNE ROOF DRAIN Do not connect to fOOM17p:drain. BA CKFI4 L See ioxt for VAPCR BARRIER SLAB I WASHEO ROCK M/A. FR46E - CRAINM NaMOVEN SCOrEXRLE V . NVI CRA M. AXrER FABRIC 4" PERFoRArED HARD Pvc PIPE. In VOft G/ MOW 05 low - OS 1001il?g VAdlOr crowl space. 5/ope to drolft. plam weeptia/m downward, GEOTECH CONSULTANTS A. FOOTING DRAIN'DETAIL 21*OXX HILLCREST PLACE 'EDMONDSI.WA .1.W No" vote, . 97108 1 APR 90 7 N.T.S. City of Edmonds Critical Areas Determination Applicant: I Melinda Bradshaw Mack I Determination #: I CA-99-238 Project Name: I N/A I Permit Number: I N/A I Site Location: 1 20920 Hillcrest Place Property Tax Acct #: 3736-005-007-1203 Project Description: Short Plat Feasibflity Determination: Study Required Review of a topographic map and inspection of the subject site, found what appears to be a Steep Slope Haza d Area pursuant to Chapter 20.1513 of the Edmonds Community Development Code (ECDC). This detennination is intended to replace CA-96-156, which was issued in error. The previous critical area application contained an incorrect address (21104 Hillcrest) by which the staff relied on when' performing their review. Steg Slope Hazard Area Delineation Reguirements To determine the extent of a Steep Slope Hazard Area, a topogTaphic survey of the property, prepared by a Licensed Land Surveyor must be obtained. Any* slope of 40% or more, with at least 20 feet of vertical rise will be classified as a Steep Slope Hazard Area. From the toe or top of the Steep Slope Hazard Area, a 50-foot buffer plus a 15-foot building setback is required. The survey is to confirm the presence of a Critical Area and locate the buffer and building setback as mandated by ECDC Chapter 20.15B. For development of any kind that is proposed within the, 50-foot buffer, the 15-foot building setback, or critical area itself, the following options may apply: I . A licensed geologist or geotechnical engineer may provide evidence to demonstrate that a buffer alteration down to 10 feet plus a 15-foot buffer setback will have no adverse impact upon the site, the public or any private party. This effectively reduces the requirement from a total of 65 feet from the top or toe or slope down to 25 feet. A geotechnical analysis of the site and statements regarding the setback reduction and lack of adverse impact on the public is required prior to any development permit application. 2. If development, must occur within the critical area, buffer and/or setback and is not identified as an exception, a variance or Reasonable Use Exception and variance pursuant to ECDC Section 20.1513. may be-p-ossible. The site is also identified on the City of Edmonds Environmentally Sensitive Map. SEPA review will be required of all development applications or permits Karissa Kawamoto �11# - � V, 6 � j 8/24/99 Name Signaftk--� /"c Date lecel Ver, JAN - 3 2o03 PEFQIT COUMTEj? Slope backfill away from foundation. NGHrUNE ROOF DRAIN Do not connect to. ftffi7g: drain. BACKF14L See lex/. for BARRIER SLAB 5 BA CKF14 L je.v/ fa y N WASHED ROCK 4 min. 70 :- 00. 6 FR46C - WAINING 4.X7, N016RAVEL NaMOVEN 6EMEXrXE ap/0 FILMR FAMIC 4" PERFORAIMD HARD PVC PIPE. Invert at least as low. as 100m,79 andlor crowl Wee. Slope to alroln. Place, WdePha/05 OoWNWOIV.� ,STREET FILE GEOTECH CONSULTANTS RECEIve-m JAN - 3 2003 PERMIT COUNTER FOOTIN% DRAIN DETAIL 2 1*0XX HILLCRESTPLACE 'EDMONDSo.WA 11 ow No., 97108 APR 1997 N T.S.- 03/05/2@03 16:50 4257478561 GEOTECH PAGE 02 March 5, 2003 JN 97108 Northcrest Development P.O. Box 340 Edmonds, Washington 98020 Attention: Rick Klemm Subject:. Review of Plans Proposed Residence. 20920 Hillcrest Place -Edmonds, Washington Dear Mr. KJemm: We have completed a general review of the geotechnical aspects of the plans for the residence to be constructed at 20920 Hillcrest Place. The plans we reviewed included Sheets 1 through 7 of Plan #2616. Design Consultants prepared these plans, which are dated March 4, 2002. We also reviewed Sheet I of I of a Single family Lot Clearing, Grading, TESC Drainage, Sewer, and Water plan prepared by Donna Breske, PS and dated July 16, 2002. We completed a geotechnical study of this site on April 14, 1997. The proposed residence will be located at the northern end of the site and will step up the hillside. The cleMgn features a sloping crawl space between the upper eastern portion of the house and the western basement area. The maximum recommended permanent slope in this crawl space is 1-5:1 (Horizontal -.Vertical), and it appears that a basement retaining wall will be required. The design parameters included in our geotechnical report may be used to design this wall, but an active pressure of 60 pounds per cubic foot should be used due to the sloping backfill. Furthermore, we recommend that all of the backfill placed in the crawl space consist of imported gravelly sand containing less than 5 percent fines (silt or clay particles), and two foundation drain lines should'be instal,led. The first drain should be located on a small bench or ditch cut into the interface between the loose weathered till soils and the underlying dense glacial till. This drain will need to be located in the field once the excavation is in progress. The second drain would be located at the base of the basement retaining wall. Both of these drains and the exterior perimeter footing drains should be constructed as shown on Plate 4 Of our geotechnical study. No explorations were completed near the base of the steep slope area for our previous study. Dense, glacial till soils are exposed along the toe of the slope in the steep cut south of the proposed house. However, depending on the depth to the dense bearing soils in the area of the western end of the house, some overexcavation for the proposed footings could be required to expose these soils. Depending on the actual site grades encountered, the eastern footings may also need to be lowered to bear directly on the dense glacial till soils. We understand that the adjacent house to the north of the site is over 20 feet from the common property line and therefore will not be affected by the proposed house excavation. We recommend constructing the proposed rockeries according to the attached rockery detail. Also, it would be preferable to move the southern rockery away from the southeastern corner of the house such that a distance of 7 feet can be maintained between the rockery and the house. The S r9A TRUEET FILE r '�!7'cf _1 03/05/2003 16:50 4257478561 GEOTECH PAGE 03 Northcrest Development JN 97108 March 5, 2003 Page 2 maximum grading . inclination above the rockeries should be 2:1 (H:V), and 3:1 (H*V) would be preferred. This grading restriction will require that the rookeries be somewhat taller and possibly that the grading be extended up the slope. in our judgment, considering the above clarifications, the plans conform to the recommendations in our geotechnical engineering report. We trust this letter satisfies your needs at this time. Please contact us with any questions or if we can be of further service. Attachment — Rookery Detail JHS- alt Respectfully submitted, GEOTECH CONSULTANTS, INC. FE-XPIRES 01-33-777-7 James H. t5trange, Jr., F. Geotechnical Project Manager GEOTECH CONSULTANTS, INC. 03/05/2003 16:50 4257478561 GEOTECH PAGE 04 I-- ................... Height (H) Max.=$ feet Min.-12" Notes: Mlnlmurn '12-Inighes depth of compacted native soil or topsoil 1 or2 2:1 (H:V) slope.-� Froo-dralAing bacitfill (Maximum 5% fin0s) Minimum iz-imhes width of 2"-4" quarry spalls adjacent to rockery. Dense, Native Glacial Till 1. Rockeries shall be constructed in accordance with King County Standards and generally -accepted local practice. 2, RoO shall be sound and have a mWnum density of 160 pounds per cubic foot. cut face Woven Filter Fabric Rock: Minimum 9'cover over, and 2" under pipe. perforated PVC pipe (slope to drain) 3. A minimum of 12 inches of quarry spalls shall be placed between the rockery and the Cut face, umh n 4-inch diameter wrforated dmin olne installed at the base of the rockery as shown. 4. Exposed slopes should be vegetated or hydroseeded following completion pollental for erosm. I try' 11 E 0 T E 'C J Hi L CONSULTANTS, INC. Fffk-PIRES 01—` � 'I Rockery Detail Proposed Residence 20920 Hillcrest Place Edmonds, Washington Ae ft.- Dalie; 911108 1 Mamh 2003 PLANNING DATA NAME: - Ket%-% MZACAL DATE: 2 / 2 -,/ r, -3 SITE ADDRESS: Z,09 7-6 - ff� It tvj , P1, PLAN CHK#:-03 - 0-13 PROJECT DESCRIPTION: 0w c , n4 u - ?,!�, : k res re-, % ce— REDUCED SITE PLAN PROVIDED?: (&-/ No 4 Gki MAP PAGE: O� CORNER LOT: (Yes FLAG LOT: 6H'-W-r �44 ZONING: P-S-il CRITICAL AREAS DETERMINATION #:- 1199-214? Study Required: S ff4 1 4""f "4 "h fH" 5 him - y-, 1!;4 1 r - -z - 1�ir C'I Waiver 4-j/A, 14 P-e� C 41Pt tll-kA Conditional Waiver SEPA DETERMINATION: _TSS,.,,A '7,,D �,ij - OW 107P'JL Fee Checklist 4 O.."9C Np"?% UAPO list w/ notarized form. Ef (Needed for 500 cubic yards of grading, Shoreline Area- site within 200 ft. of Puget Sound or Lake Ballinger) U Exempt SETBACKS: '�" V ­0 ?_ - 4. M I-W Required Setbacks: Street:_ZFr-- Left Side: 15 Right Side: 7. 9 Rear: / S' Actual Setbacks: Street: Left Side: I()' Right Side: 1901 Rear: 3 3 Street map checked for additional setback required? (V-e-s,/ No Nil I Mi &V--j7 DETACHED STRUCTURES: 1411, 0 4. U"ROCKERIES: 2 3' PAS" El FENCEsrrRELLISES: K, /'46 C-Prk-'i BAY WINDOWS / PROJECTING MODULATION; 6&AAU,4--4 Yh� Swb-" La STAIRS / DECKS: goi t 3 1, PARKING: Required: 2� Actual: LOT AREA: 570 5,54 , LOT COVERAGM, 3t4--9;1 Calculations: -TT.q st. 2"11S-0 BUILDING HEIGHT: Datum Polnt:_'5r-'�� yyy ft- �--4 Datum Elevation: Maximum Allowed: 2,51 Actual Height: 2, 1 A.D.U. CREATED?: (No / Yes) SUBDIVISION: LEGAL NONCONFORMING LAND USE DETERMINATION ISSUED: (Yes OTHER: Plan Review NewBPP1amingDataForm.D0C e c i,�') o .6 � — K. w , c7j.;,�J 5 ) -r, e ((; 5 Ll- 2, fro — J� o of �eAclp_ (^34-. 5go2c 13 5 lc,,ory\ 61 tie h e, ckt- r, r R + a IAg Mtk,5(- --?F L"CeD j) ?PAVAlV- -PROWIZN 1� (DL�fNw_ ?,Eefoos( ' &),� Vbg- W--�(NIP4 APPROVED -BY PLANNING f) c C3 0 -7. 30 - sf. t 0 . t Co r n e- (- 1 1 5 /- '\ 1 5 e- e, . -, 5 �v 6e 1'-frooA foln 51 .1/4�6 lf_�_ e rl C e bo OOT U\)uo�� ()g- pp �-r 4v '-poe), -ro wv �, ITY STREET FILE � AC e + APPROVED AS N B ELW_�lN%Yk.," Date: 5-1 CR A C -e Ck,\8 5 CJC E I P ill c rri 11, y 1 7 j 7111 AR j PERMIT COUNTER CITY OF EDMOND'-' C Z3 BUILDING DEPARTMENT kv-\Cc- ADDRESS OkAINER-1 A O�VD DATE*_ 11-03 PPROVED DATE: , OF: C L rBLL D G, 0 . PFFICIAL P MIT J�UV tnoan PERMIT NUMMEn I T C STREE I I ILE CAFILENO. '4q-ZISS Critical Areas Checklist ---------------- --------------------------------------------- Site Information (soils/topo raph./hydrology/vegetation) 0 -Y ��99- .11 / - 1. Site Address[Location: �i� 2. Property Tax Account Number: 3. Approximate Site Size (acres or square feet): 492- 9 rc, / g5x 4. Is this site currently developed? —yes; -X no. If yes; how is site developed? 5. Describe the general site topography. Check all that apply. Flat: less than 5-feet elevation change over entire'site. Rolling: slopes on site generally less than 15% (a vertical rise of I 0-feet over a horizontal distance of 66-feet). Hilly: slopes present on site of more than 15% and less than 30% ( a vertical rise of I 0-feet over a horizontal distance of 33 to 66-feet). Steep: grades of greater than 3 0% present on site (a vertical rise of I 0-feet over a horizontal distance of less than 33-feet). Other (please describe): 6. Site contains areas of year-round standing water: ­, &c/—; Approx. Depth: 7. Site contains areas of seasonal standing water: Approx. Depth: What season(s) of the year? S. Site is in the floodway floodplain —,AL of a water course. 9. Site contains a creek or an area where water flows across the grounds surface? Flows are year- round? Flows are seasonal? (What time of year? 10. Site is primarily: forested meadow________; shrubs mixed urban landscaped (lawn,shrubs etc) 11. Obvious wetland is present on site: ^CMhk.d0V, Rev 10/03/97 City of Edmonds CRITICAL AREAS CHECKLIST E, The CriAW k6; . Checklist contained on this form is to be pffi ,I-qd'. outl— by any person preparing a Development Permit Application for the City of Edmonds prior to his/her submittal of a development permit to the City. The purpose of the Checklist is to enable City staff to determine whether any potential Critical Areas are, 'or may be, present on the subject property. The information needed to complete the Checklist should be easily available from observations of the site or data available at City Hall (Critical Areas inventories, maps, or soil survV An applicant, or his/her representative, must fill out the checklist, sign and date it, and submit it to the City. The City will review the checklist, make a precursory site visit, and make a deterinination of the subsequent steps necessary to complete a devel'opment permit application. Please submit a vicinity map along with the signed copy of this form to assist City staff in finding and locating the specific piece of property described on this form. In addition, the applicant shall include other pertinent infoiandtion (e.g., site plan, topography map, etc.) or studies in conjunction with this Checklist to assist staff in completing their preliminary assessment of the site I have compQ�ih�`�tiached Critical Areas Checklist and attest that the answers provided are factual, to the best of my knowledge (fill out the appropriate column below). Owner/Applicant: Fo,-� Street Address �V,00!e city, State Zip Z� 373 - -TeIevh-o-ne Signatu�e I- ,A- Iq X 3 A7 Applicant Representative: Name Street Address city State Zip Telephone Signature Date crecepdon�anakacl.doc Date (over) I City of Edmonds Critical Areas Determination Applicant: Melinda Bradshaw Mack Determination #: CA-99-238 Project Name: N/A Permit Number: N/A Site Location: 20920 Hillcrest Place Property Tax Acct 1 3736-005-007-1203 Project Description Short Plat Feasibility Determination: Study Required Review of a topographic map and inspection of the subject site, found what appears to be a Steep Slope Hazard Area pursuant to Chapter 20.1513 of the Edmonds Community Development Code (ECDC). This determination is intended to replace CA-96-156, which was issued in error. The previous critical area application contained an incorrect address (21104 Hillcrest) by which the staff relied on when performing their review. Steep SloRe Hazard Area Delineation Requirements To determine the extent of a Steep Slope Hazard Area, a topographic survey of the property, prepared by a Licensed Land Surveyor must be obtained. Any slope of 40% or more, with at least 20 feet of vertical rise will be classified as a Steep Slope Hazard Area. From the toe or top of the Steep Slope Hazard Area, a 50-foot buffer plus a 15-foot building setback is required. The survey is to confirm the presence of a Critical Area and locate the buffer and building setback as mandated by ECDC Chapter 20.1513. For development of any kind that is proposed within the, 50-foot buffer, the 15-foot building setback, or critical area itself, the following options may apply: I . A licensed geologist or geotechnical engineer may provide evidence to demonstrate that a buffer alteration down to 10 feet plus a 15 -foot buffer setback will have no adverse impact upon the site, the public or any private party. This effectively reduces the requirement from a total of 65 feet from the top or toe or slope down to 25 feet. A geotechnical analysis of the site and statements regarding the setback reduction and lack of adverse impact on the public is required prior to any development permit application. 2. If development must occur within the critical area, buffer and/or setback and is not identified as an exception, a variance or Reasonable Use Exception and variance pursuant to ECDC Section 20. 1513. may be possible. The site is also identified on the City of Edmonds Environmentally Sensitive Map. SEPA review will be required of all development applications or permits Karissa Kawamoto its 8/24/99 Name S�Ignaffir� Date CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 - FAX (425) 771-0221 DEVELOPMENT SERVICES DEPARTMENT Planning - Building - Engineering August 24, 1999 Damon Helland 7810 Greenlake Drive North Seattle, WA 98103 Subject: . Determination regarding Critical Areas Checklist # 99-238 Dear Applicant: BARBARA FAHEY MAYOR Enclosed please find a copy of the Critical Areas Checklist you submitted. The "DETERMINATION" reached by the City is located on the reverse side of the form (bottom of page). It is very important for you to retain a copy of this Critical Areas Checklist "DETERMINATION" for your records. ............. ...... ATAIVT INFOPMA116WTO BE* rkb.. .............. ................................ ........... PLEASE EXAMINE THIS" DETERMINATION" FOR ADDITIONAL REQUIREMENTS. YOU MAY NEED TO SUBMIT ADDITIONAL INFORMATION SUCH AS AN ENVIRONMENTAL CHECKLIST OR CRITI LAREASSTUDY, The 'DETERMINATION' for the Critical Areas Checklist you submitted is a site -specific determination not a project -specific determination. no, You must submit a CODY of the CRITICAL AREAS CHECKLIST and DETERMINATION WITH ALL PERMIT APPLICATIONS or YOUR APPLICATION WILL NOT BE PROCESSED. _4111111 Permit applications include the following: Enc: Determination cc: Melinda Bradshaw Mack 4270 Whitman North Seattle, WA 98103 Architectural Design Board C:Reception\Jana\CRLTR.doc Building Permits Conditional Use Permits Subdivisions Variances Applications to the ADB* Land Use Applications Any other development permit applications. Thank you. Planning Secretary Incorporated August 11, 1890 Sister City - Hekinan, Japan V I L- V- 1 N XJ Critical Areas Checklist Site Information (soils/topograpliy/hydrology/veget:ation) 1. Site Address/Locatiom -P Cq1@Wy"i(Ct-,-5--,4 2. Property Tax Account Number: 5716 - 006 - 6V 7- 3. "Approximate Site Size (acres o ( '06) 2- 3V 4. Is'this site currently developed? _yes; -)� no. If yes; how., is , site developed? 5. Describe the general site topog raphy- Check al . I that apply. Flat: less than 5-feet elevation change over entire site. Rolling: slopes on site generally less than 15% (a vertical rise of 10-feet'over a horizontal distance of 66-feet)- Hilly: slopespresent on site of more than 15% and less than 30% ( a vertical rise of 10-feet over a horizontal distance of 33 to 66-feet). Steep: grades of greater than 30% present on site (a vertical rise of I 0-feet over a horizontal distance of less than 33-feet). Other (please describe): 6. Site contains areas of year-round standing water. Approx. Depth: 7. Site contains areas of seasonal standing water: Approx. Depth: What season(s) of the yearT. 8. Site is in the floodway floodplain of a water course. 9. Site contains a creek or an area where water flows across the grounds surface? Flows are year- round? Flows are seasonal? _ (What time of year? 10. Site is primarily: forested meadow shrubs mixed urban landscaped (lawn,shrubs etc) 11. Obvious wetland is present on site: For City Staff Use Only s I. Site is Zoned? 2. �CS mapped soil type(s)? A- LL*,-kvJ L A,,,J Ca,� lex :5&�,.* 3. Wetland inventory 'or C.A. map indicates wetland present on site? 4.--:'- :',C ritical Areas inventory or C.A. map indicates Critical Area on site? 5. within designated earth subsidence landslide hazard area? /L.10 6. designated on the Environmentally Sensitive Areas Map? -DETERMWATION `�tUDY REQUIRED CONDrrrONAL WAIVER WAIVER wed by: Revi6' Plannejo� Date RCV01/0W94 "go - 199- City of Edmon& Critical Areas Checkl's ist The Critical Areas Checklist contained on this form is to be filled out by any person preparing a Development Permit Application for the City of Edmonds prior to his/her submittal ofa. development permit to the City. The purpose of the Checklist is to enable City staff todetermine whetherany POtentia]'Critical Areas are or may be presenton the subject property. The information needed to complete the Checklist should be easily available from observations of the site or data available at City Hall (Critical Areas inventories, maps, or soil surveys). An applicant, or his/her representative, must fill out the checklist, sign and date it, r!b JUL 10 PERM' T COUNTER and submit it to the'City. The City will review the checklist, make a precursory site visit, and makea. determination of the subsNuentsteps -necessary to complete a development permit application. With a signed copy of this form, the applicant should also submit a vicinity ma or plot plan for individual lots -of the parcel with enough detail that City staff can find and identify the' subject parcel(s). Jn addition, the aPplicant shall include otherpertinent information (e.g. site plan, topography map, etc.) or studies in conjunction with this Checklist t'o assist staff In, completing their preliminary assessmentof the site. I have completed the attached Critical Area Checklist and attest that the answers provided are factual, to the best of my knowledge (fill out the appropriate column below). Owner I Applicant:* Name Street Address K't-07- WA- - Opt -Ozz// City, State, ZIP Phone Signature Date Applicant Representative: Narne Street Address C Z7 City, State, ZIP Phone 7/,oA�1 S ature Date I J I 4 ....... .. . 7� C. IV.Etr- PLA A= oE saw.. A —.Ore/ '.7 4? Mrs. .............. ............................................. ................................................... Seller, and ..... .......... D G* and. ........................................................................ husband .... ...................... ........................ ....................... ............................................ ...................................... ......................................................... ............................................... hereinafter termed the Purchaser; WITNESSIETH That in consideration of the stipula tions herein contained and the payments to be made as hereinafter specifi�d, the seller hereby agrees to sell to the purchaser and the purchaser agrees to buy from the seller the following described real property I with the appurtenances, situated in. the Coi�nty oL ....................... ............... I ........... State of Washington, to -wit: 'rr.-O Nloxr.h 270 f eat of , t iie c cuth '73. c,4,, f A to 0 Qt O-AL' Lot 7., Dlock Manor NO', 9,, az =_aziurcd alonZ -L'"llo line =1��, 90.01 -'CCA- thereof; -U. '.Zjt.% Cn-CZ.,CjjA- 4'0;: :Lr OVCr 41 f.Cc,. OZ '--'10 `10,-Ith 3CO Zeat of the Svath 853.8/+ Aldc::-100d Ila:= 14o. fc-ct 0± zaid 7 TOGLUUM With 4-tcr0c;t LI az4 '0 that ccrtaia prjvaltc ro.-,A- z�nd doscribeld ap,: Tim' 1 '0 I'k-ct of t2ae _;M st 1"'35 e t 0 f 1-1 1110 INCa-lb.", fect of Lot 7, 1 !Uock 5, idden.,00d lizMC-11 No. 9.., mid the Wcat 50 A'Coz Of t- h a .LC U-1 6`5 Z' 0�- Of tho, South 8?1 Ez'st 135 ' et Of tne !'ort X` ct a3 Iucasurca i 0 a-10:119 'LIAIO East. I:Lno jU:D tho, !�V- 11ce. Oz tLmi Ea--t 150' fcct . of tho 80 fCQt Of thO SOUtIh 205 Zee ka' of Lot - 7-A az r.casuz7od ajc.-Z" tho Lao'- all in Lot7j, DIOCk 5, -Padea-wrood Mmoz- 1­0 StatO Of Wazhinr;l. 9., slturta ;U1 the County.Of Oil. —Vass Sale "k0s,", 5 % *,a ft In 0152 file offs i-� L A 9 wit Ire Off# 1: too ags S"WAWS 'BAV W.L FA V soft j%WWOW MA sow 0& zoos Q 04 We 91*8 LLLA 7- R r4 SOS 1w Z04 w CIL42 49 60IFF I.: w fzbv a Isi's V) kc 61K 46 (n 0 w szw F lifps ;Awv gas -1C Koss 9058 Use %A wo MIS #ZW USS 9 wis Soso 4N also 60519�4 /156 /Or, 19, so use ISO �A— — m *w jiff gist 61.69 pt z 1 1A uj 14, USS else fis"19 1,T58 g"S Oise also SEL 0170 14 - I N w d) ;z A AU99 i� alto 04 A 400 � *M C4 0&0 0 104 aid T WMAIC size Y/1V via? -wv = G Ct a/ 4i E c ft FAVUASS Am TA BAW 1AV ft-A we fA ',?A V Ou —Soso- %-'alLult IS . '2 4 ease t iz WN Z rise t 4— 51n nee 1?98 ozvt$ #fee t fir in %ft fq, 11'r Imp 2069 1069 V 569 068 5069 68 44 — woo o168 6069 o4 0/00 OUP ----i be 1166 91-69 SI-66 I" -;�/ 6-0 5160' 8160 j — t�- rd Me ".4 14 1 60 ;; 1, 68 '48rijq 9969 Ali; 0160 U69 IW6 1096 toob S-7/ Use T006 1/06 0106 jigs Vb 4" 9106 z906 OrO6 1106 906 &TOb it 9 W04 tZod A — 1116 TOM W6 Owl on OZ16 In OD of All 4 4? 2-US L-Z wvvd M 'PAV 36 'JFAV air 76 -1 Fen, 121 C e-1 all fte" -I n Mr. Or- Ow. W. W, W W. w w Impermeable Required Area Sq. Ft. Vol Cu Ft 2000 50 5 0 62 3 oo 000----- 75 87 4000 100 4500 112 5000 125 Note: Allowable Pipe Materials: tenton Pipe Sizes Pipe Diameter 15, 18'. 24d 30' 40 28.. - 16 10 50 35 20 13 60 42 24 15 Required pipe 70 -49 -28 18 -length in feet 80 56 32 21 90 63 36 23 100 70 40 25 Reinforced Concrete Aluminized Steel Aluminum CMP Asphalt Coated N — 12 ADS (Not permitted on roads) F__�Table 2 — Outlet Orifice Sizes Impermeable Area Sq. Ft. 2000. 95M �3000 ----3500 4000 4500 5000 Outlet Orifice Diameter (Inches) 5/8 5/8 3/4 3/4 7/8 7/8 7/8 3 — Rectangular Catch Basin Requirements Detenton Max. size Catch Basin pipe diameter knockout Type 10 20' Type 1, CB 15 26' Type IL, CB 16 36' Type 11, CB 19 19 (481 Basin) 36' to 42" 42' Type 11, CB 19 19 (54' Basin) *Source: Assoc. Sand & Gravel Co, Standards 5 P,evised 3/16/95 STANDARD DRAINAGE DETENTION SYSTEM WORKSHEET -1+ at-o- ow ADDRESS - wo 10 CALC BY: PHONE:Lq25)'3 3q- q'ISO DATE: *****DESIGN DATA***** IMPERVIOUS AREA PIPE DIA PIPE �G ORIFIC.E -Z --9# lei Pkk DETENTION PIPE LENGTH LOCKM L ID ISHED G M M NIMUM I C FF.'"v D N NC6 IGHTL *Al' ,R a EpR8M Qrq0, .5% TO 1% SLOPE CONC BOX OR RISER Z_ETLET PERMIT COUNTER F OUTLET CONTROL MIN. UPPER CATCH BASIN aRIrIcE CONTROL CATCH BASIN JA ti 3 2093 SYSTEM CROSS SECTION P8.940 cot/4 2'XZ'X6',DEEP, 4-6- SPALLS OR EQUAL FROM CONTROL C9 2'X 2'X 3' DEEP: 3/4' CRUSHED ROCK 1p-�� ISTING GRADE UTLET WASHED RO FROM CONTROL 0 51177 CK TRENC B� MIN 10' L6W. PERF PIPE TO LEVEL PERF PIPE W/ END CAPS TR SMALL E LINSP WITH MIRAr PRIHTO PLACLME N WASHED DRAIIN ROCK jvpjup ottrur RUNOFF SPREADER. TRENCH FOOTING DRAINS SHALL NOT BE CONNECTEDTO DETENTION SYSTEM NOTES: 1, Call Engineering Division (771-0220) for a tightline, and detention system inspection A� before backfilling and for fmal inspections. APPROVED BY 2, Responsibility for operation and maintenance of drainage systems on private property is the responsibility of the property owner. Material accumulated in the storage pipe must be flushed out and removed from the catch basins to allow proper operation- 71te outlet control orifice DATE must be keot oDen at all times. City of Edmiol RfGHT-OF-WAY CONSTYP A. Address or Vicinity of Construction: 'C3 C1 b v B. Type of WArk (be specific):. ek �ds Permit No: ".2W3 0/13 UCTION PERMIT iss u e Date: (9 C) oyl C. Contractor: 1� oc A Contact: Mailing Address:.' 3�n)La_ Au ti Phone:c�LLa 4232' C9 q,2 Sl- State.Licen,se* #:- LC H d T_ I(.)( V1 -1 y2i Liability Insurance: Bond: $ D'. Building Permit # (if applicable): Side Sewer Permit # (if applicable): CommerciaF, El Subdivision E] CityProject. EUC(PUD, VERIZON, PSE, AT&T, OVWD) Multi -Family' E] Single Family Other fNSPECTOR: F. PAVEMENT CUT: k YES El &6 G. SIZE OF -CUT x S CONCRETE CUT: [__1 `�ES, EII:NOr INDEMNITY. Applicant understands by his/her signature to this application helshe holds the City of Edmonds harmless from injuries, damages or i�laims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City o f Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorneyfees by reason ofgranting this permit. THE CONTRACTOR -IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOFffNG THE FINAL INSPECTION AND ACCEPTANCE OF THE WORK. ESTIMATED RESTORATI ' ON FEES W!LL BE HELD UNTIL THE FINAL'STREET PATCH IS COMPLETED BY CITY FORCES, AT WHICH TIME A DEBIT OR CREDIT WILL BE PROCESSED FOR ISSUANCE TO THE APPLICANT. * Traffic control and,public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by (WAC) 296-155-305 and must have certification verifying completion of the required training in their possession. * Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City - approved material prior.to,th ' e. end of the workday - NO EXCEPTIONS. * Three yts of construction drawings of proposed work are required with the permit. application. ,�. ., k I CALL*.DIAL-A-DIG (1-800-424-5555) PRIOR TO BEGINNING WORK I HA VE READ THE ABOVE STA TEMENTS AND UNDERSTAND THE PERMIT REQUIREMENTS AND A CKNO WLEDGE THA T I MUST MA KE THE PINK COPY OF THE PERMIT A VAILABLE ON SITE A T ALL TIMES FOR INSPECTIONS Signature. k, tL- Date:_7 ZZ 6 _-S (Contridor or Agent) FOR CITY USE ONLY Approved by: I Lgg��_ Right-of-way "Fee: Time Authorized: VoidAfter, r I -OIZ Disruption Fee/Fund 111: Special Conditions:. P-P- abu R;R 0,11\1 Restoration'Fee: , 01�eo<,4 ge��R-,F 01 gel) U bLe Pi;:' Total Fee: cQ q S' _724u, K6� x. R­ lug, 0,QA)D 111 J bt I I-O'MR1 AQ V Receipt I No- -WF-050 f)8649�01!S P&10E—_M 1A-Jgr_4TU_-f— Is'sued"b R-:: Ez; ��q 41 v4q M wp��- U_, L f .A:Z� W kjAt)�' dm FJX�n(Ot� 6F= P(�O-Tla:�r 42471'11 OTTO Y UPON COMPLETION OF PERMITTED VORK9 AN ENGINEERING FINAL INSPECTION IS REQUIRED PER CHAPTER 18.00 OF THE EDMONDS COMMUNITY--DEVELOPME-N-T-CODE. (Pho , ne 425-771-0220, Ext. 1326) PINALAPPROVAL2 ­tltk�iTTED VORK. DATE,:-, Insbector's Signature For inspection requirements see Engineering Inspection Information handout. NMI "Mrs ,\My.pocuments\Forms\Engnmg�ROWpermit_.doc RECEIVED JAN 3 1 2012 EDMONDS CITY CLERK Return Address: City Clerk City of Edmonds 121 - 5th Ave. N. Edmonds, WA 98020 Property Address: None 2012)ZO A ffcre-.5�- /,0(- 201112280354 2 PGS j2128120ji 10-16am �63-130 SNOHOMISH COU�Ty, W SHINGTON NO EXCISE TAX -"'PET FILE REQUIRED �.-, N , QT '. - DEC 28 2011 UTILITY EASEMENT KIRKE SIEVERS, SnohodA County Treasurer By KIRKE SIEVERS Assessor's Property Tax Parcel Nos.: 00373600500713, 00373600500714, 00373600500715 IN CONSIDERATION of benefits to accrue to the grantors herein, the undersigned, Daniel Eagle and Kimberly Eagle, hereby grant to the CITY OF EDMONDS, a Municipal Corporation, a permanent easement for the installation, construction, operation, maintenance, repair, reconstruction or replacement of a waterline conveyance pipe and necessary appurtenances ' over, across, through, and below the following described property, and the further right to remove trees, bushes, undergrowth and other obstructions thereon interfering with the location, construction, operation, maintenance, repair, reconstruction or replacement of said waterline conveyance give and necessary armurtenances, together with the right of access to the easement at any time for the stated purpose. The easement hereby granted is located in the COUNTY OF SNOHOMISH, STATE OF WASHINGTON, described as follows: THAT CERTAIN PRIVATE ROAD OVER LOT 7, BLOCK 5, ALDERWOOD MANOR NO. 9 DESCRIBED AS THE SOUTH 50 FEET OF THE EAST 135 FEET OF THE NORTH 330 FEET, AND THE WEST 50 FEET OF THE EAST 135 FEET, EXCEPT THE NORTH 280 FEET THEREOF. The easement area is depicted in the drawing attached as Exhibit A. THE CITY agrees to restore to substantially the original condition such improvements as are disturbed during the construction, maintenance, and repair of said. utility or utilities, provided the grantors, their heirs, or assigns shall not construct any permanent structure over, upon, or within the permanent easement. DATED THIS / Kimbely Eagle STATE OF WASHINGTON) ) ss COUNTY OF SNOHOMISH) On this day personally appeared before me Daniel R Eagle and Kimberly Eagle, to me known to be the individuals described in and who executed the within and foregoing instrument and acknowledged that they signed the same as their free and voluntary act and deed, for the uses and purposes therein mentioned. UNDER MY HAND AND OFFICIAL SEAL THIS 19-�'DAYOF 201 BRADLEY A. BERGET NOTARY PUBLIC STATE Of WASHINGTON MY COMMISSION EXPIRES 01-18-15 NOTARY PUKIC in and ddr the State of Washington, residing at EXHIBIT A MAIN ST -j- Lot 7, Alderwood 20902 Mcnor No. 9 2091-4 "'��Easement 21105 21109 21113 RECEIVED. JAN 3 1 2012 jp� it it ii ii it �v� lill �i� it i� it EDIVIONDS CITY CLERK W11228035i 2 PGS 1! 3,00 1212112011 10-i6am �� S�O�OMISH CONTY, W SHINGTON Return Address: City Clerk City of Edmonds PTREETFILE0 EXCISE TAX 121 - 5th Ave. N. Edmonds, WA 98020 REQUIRED - DEC 28 2011 UTILITY EASEMENT KWE SEVERS., snohomiA COO Tmwmr Property Address: None By Assessor's Property Tax Parcel Nos.: 00373600500713, 00373600500714, 00373600500715 IN CONSIDERATION ofbenefits to accrue to the grantors herein, tile undersigned, Charles Carey, hereby arant to tile CITY OF EDMONDS, a Municipal Corporation, a permanent easement l'or tile installation, construction, operation, maintenance, repair, reconstruction or replacement of a waterline conveyance pipe and necessarV appurtenances, over, across, through, and below the following described property, and the further right to remove trees, bushes, undergrowth and other obstructions thereon intert-ering with the location, construction, 7 Z, operation, maintenance, repair, reconstruction or replacement ofsaid waterline conveyance pipe and necessary appurtenances, together with the right ofaccess to the easement at any time for the stated purpose. The easement hereby granted is located in the COUNTY OF SNOHOMISH, STATE OF WASHINGTON, described as follows: THAT CERTAIN PRIVATE ROAD OVER LOT 7, BLOCK 5, ALDERWOOD MANOR NO. 9 DESCRIBED AS THE SOUTH 50 FEET OF THE EAST 135 FEET OF THE NORTH 330 FEET, AND THE WEST 50 FEET OF THE EAST 135 FEET, EXCEPT THE NORTH 280 FEET THEREOF. The easement area is depicted in the drawing attached as Exhibit A. C, THE CITY agrees to restore to substantially the original condition such improvements as are disturbed C, during the construction, maintenance, and repair of said utility or utilities, provided tile grantors, their heirs, or assigns shall not construct any permanent structure over, upon, or within the permanent easement. DATED THIS 30" DAY OF /2 2, �zl -c' h 20a C �harles CareyC--r 61 STATE OF WASHINGTON) )ss. COUNTY OF SNOHOMISH) On this day personally appeared before me Charles Carey, to me known to be the individual described in and who executed the within and forecoina instrument and aclulowledged that4ie"ioned tile same as tkt�T free and voluntary act and deed, for the uses and purposes therein mentioned. P) vs UNDER MY HANDAND OFFICIAL SEAL THIS DAY OF /�Z, .20 (-_N3TAY�l PUBLIC ip/596 for'the State 61[1�yshington,�rd'siding at /,,v 7, v , EXHIBIT A MAIN ST Lot 7, Alderwood 00902 Manor No. 9 20914 Easement 21105 21109 21113 07- 3 -7, 5- - 0 o -7 — p ZC� 3 146-16HT- CALCULAVOP415 R, C- r- ri-em m � 11 , r- Dell, 7-097-0 - .3qo ido4l8oza 3 1 e, I �5cJBJ,�-"L,7- T�) C- 102- V_ 0 2 q 5- 5,�;- 4r\j r> Iq DEC, t o ^J 17Z- R-cmyLizo APPROVED BY PLANNING S"Of R E E T I L E Z- 2- '7 5 0 -:117, 1�4. �7 Lor COV6p4+&ls : Z4610 (11 %) PERMIT COU EMR Z&r 5COF9 : 2-7�. 7-,�, -,> ,�Ef5 el+jeme-A-)-r "Fzl&q"5) Z-7o I 140S F- V 0 C> x �3z Lp E�5A-17- -DWFU, tA -Fl- e — --w 0 C> — 7- 4y —7 � *- oo - / 7-- C' 2> &-C--AJ 7-) : C,)( IST/ 4 C, -C PAO P&�e-D LW"—Iq 1 "A&O LOA* GAITV-4 ,7-. L";�4 7— J A-) <7 An 7 n2 -7�� sf- - F�-,,qv OWNER/CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL AND DAMAGE —7-0 ? -77) ff- o ,7 -7 01 "o tv, I Rece, In Ver) JAN - 3 2003 s PER"- CQUArrEli 4 TREE r F/L E. +�o 27o.00 3-7D 40 C4�5-) 7 7 L� '3 t t I APPROVED AS NOTED BY ENGINEERING ---,T-BC,r-o li L Date:--� 39 D 3ac) A 0000 0� oi� o '00 PROPOSED 1 1/4- MPE-IP MAIN — 'S CA PROPOSED 1 1/4- MPE—IP MAIN ----'E C/L E.O.M. 1 1/4- MPE CAP — I S. __ 'E CA 1 P�_. 0 8 F- z UJ 2 LU W LO I MAIN ST (208 ,9 R2 50' CO R/W F - -_ -,qs 2_8�, 6- . EX. 5/8" 271' 1989 0) 0 C14 STANDARD GAS CONSTRUCTION NOTES: ST SW) 1 - FIELD LOCATE ALL UNDERGROUND UTILITIES. CALL "ONE—CALLN TWO WORKING DAYS PRIOR TO CONSTRUCTION, WESTERN WASHINGTON CALL: 1-800-424-5555. IN KITTITAS COUNTY CALL: 1-800-553-4344 IN 2. ALL CONSTRUCTION IS TO CONFORM TO PSE GAS OPERATING STANDARDS AND GAS FIELD PROCEDURES. 3. EROSION AND SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150-3200 TECHNIQUES FOR TEMPORARY EROSION AND SEDIMENT CONTROL AND ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. 4. NOTIFY PROPERTY OWNERS ADJACENT TO PROPOSED CONSTRUCTION ACTIVITIES A MINIMUM OF TWO WORKING DAYS PRIOR TO BEGINNING CONSTRUCTION. USE tS1 TO DISTRIBUTE FLYERS IF JOB IS LARGE, OTHERWISE HAND DELIVER FLYERS BE SURE TO INCLUDE THE LIST OF FREQUENTLY ASKED QUESTIONS AND INFORMATION ABOUT THE OPPORTUNITY TO PURCHASE AN EXCESS FLOW VALVE WHEN THEIR SERVICE IS ISNTALLED OR REPLACED PER GAS OPERATING STANDARD 2550.1600. ALLOW ADEQUATE TIME FOR CUSTOMER DECISION AND RESPONSE. 5. ANY CHANGE IN ROUTE, TIE—IN METHOD OR ADDITIONAL MAIN FOOTAGE MUST BE APPROVED BY PSE GAS ENGINEERING SERVICES. 6. COMPLETE mPIPIE CONDITION REPORT" ON ALL EXPOSED EXISTING PSE FACILITIES. CHECK BOX ON REPORT FOR WIRE BOX (TEST LEAD) INSTALLATION. 7. ACTIVE SERVICES DENOTED BY: 8. PIPELINE MARKERS AND WARNING SIGNS SHALL BE INSTALLED AND RECORDED BY THE CONTRACTOR PER PSE GAS OPERATING STANDARD 2525-2500. 9. VALVE MARKERS SHALL BE INSTALLED AND RECORDED BY THE CONTRACTOR PER PSE GAS OPERATING STANDARD 2525-2600 FOR ALL HP VALVES IF THE LOCATION IS NOT REDILY ACCESSIBLE, AND FOR ALL VALVES WHERE PERSISTANT SNOWFALL MAY OBSCURE THE VALVE BOX 10. TO PREVENT ACCIDENTAL OVERPRESSURE OF ADJOINING SYSTEMSo NO TWO MAINS SHALL BE CONNECTED EXCEPT AS SHOWN ON THIS DESIGN UNLESS APPROVED BY PSE GAS ENGINEERING SERVICES. 11. SYSTEM MAOP DENOTED BY:ISYSTEM MA5P = 45 PSIG 1 1/4- MPE TAP TEE 12. GAUGE AND MONITOR USE OF ALL STOPPERS TO ENSURE ADEQUATE FEED. S. I VE CA 13. RESTORE ALL DRIVEWAYS SUBJECT TO OPEN CUT TO ORIGINAL OR BETTER CONDITION. 14. GAUGE AND MONITOR USE OF ALL STOPPERS AND SQUEEZES TO ENSURE ADEQUATE FEED. (USE MANOMETER FOR LP SYSTEMS) 15. RESTORE ALL DRIVEWAYS SUBJECT TO OPEN CUT TO ORIGINAL OR BETTER CONDITION. 16. PURGE POINTS AND PRESSURE TAPS TO BE INSTALLED PER PSE GAS OPERATING STANDARDS 2525.3400o AND 2525.1200. EX. 5/8* 369'S 1992 0 (D 0 0 PRIVATE RD EX. 1 1/4* MPE—IP 15' 507'S 107016076-03 JT FITTER (Check Box if Complete) • WORK AREA LEFT IN CLEANISAFE CONDITION. El • COMPLETE ALL PIPE TABLES AND GAS PRESSURE STAMP. El • FIELD CHANGES RED—UNED ON AS—BUILTS. El • MATERIAL VERIFIED AND CHANGES NOTED ON PAPERWORK. I-] • ALL VALVE AND TIE—IN LOCATIONS NOTED ON AS —BUILT. El • NOTE BEGINNING OF MAIN, EOM,& LINE OF MAIN LOCATIONS. El • SHOW ROPE LOCA77ONS & CUL—DE—SAC RADIUS El Fitter's Signature Company Employee ID# GAS MAIN INSTALLATION/RETIREMENT Type/Work Pipe size Type Estimated Length Actual Length Manufacturer INSTALL 1 1/4" MPE 330' GAS MAIN PRESSURE & TESTING TYPE TEST PRESSURE TESTED BY _�Tz_ J1,l TIME ON D ATE OFF TIME OFF TYPE TEST PRESSURE TESTED BY DATE ON TIME ON DATE OFF TIME OFF Design Press 60 SYS MAOP 45 PROJECT PHASE NOTIF# ORDER# V) SAP Superior Service/Meter— Service/Meter Service/Meter Service/Meter Ind. Service Ind. MSA Dis. Reg. /FT HP Svc/MSA Relocate Retirement X201830875 107017156 X604629388 106111056 ontractor CONSTRUCTION COST CODES: ITE Vicinity Map WORK SITE Owner / Developer Contact Info NORTH CREST DEVELOPMENT CORP. P.O. BOX 340 EDMOND, WA 98020 ATTN: RICK KLEM 206-550-4245 offloe LO :31:-113-1 Project Manager Contact Information: CALL (800) 424-5555 I 2 BUSINESS DAYS BEFORE YOU DIG PATTINESS THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF FACILITIES CELL: 425-327-2783 1 0 ML ESTATE/EASEMENT PERMIT REQUIRED EDMONDS REV# DATE BY DESCRIPTION FUNCTION CONTACT PHONE DATE 3 PROJECT MGR PATTINESS 206-418-4237 2 ENGR — GAS 1 DRAWN BY PHUONG DAO 2064184218 7/3/03 A-i COUNTY SNOHOMISH 1 /4 SEC SW19-27-04 UTILITIES CONTACT PHONE# EMER SECT 4 OP MAP 160-088 CHECKED BY PATTINESS 206-418-4237 7 - 3-a5 GAS WK CTR APPROVED BY PATTI NESS 2064184237 ?-313. MCNSEG FITTER #1 PLAT MAP FITTER #2 0 163-068 MAPP ING JOINT FACIUTIES ARRANGEMENTS PUGET 1 1/4" MPE-11? MAIN EXT. SOUND ENERGY 20920 HILLCREST PLACE, EDMONDS, WA 98026 (NORTH CREST DEVL) DESIGNED BY PILCHUCK CONTRACTORS INC. SAP Superior Order 0 = 107017156 en Dravving Number N/A eq SCALE: AGE: � i�z lot = 50' 1/1 C:1 4o7o X L)5 N-1 ,TYPE )-I' X IN, , qkl 1k. CAL SEWER 9.: wATE R Cj)NG�E r-AMIL\? L07- CL.Wi%, cqkADIN�, TESC, PRAINAGEl - vt PL, $) H I LLC R65 FoR Nom CREST t)E\;E-i_DPMF_,MT 5 E'C. T 27N,) RA ff,7 W. M. 05T 44� aeo rL, 'N 1 51101 O� '6 10 Jr z N V1 E 1. - I :.­ " - V 1( , 4 IrY MAP � r-H -4 M I'V OF 51T(_ rl: Au 41C v�' y1l, 3 A-1 Io�l t W1 I:. Ni jpp"Ib' )41 t A �_J 5: 4, -4 sF_c,T(oN li-A 0 7_0 -X) -r t�, rip Lf TWE I - L 1- 15 F-C-T- 10 M t% D_ F3 Of -s oi L_e I" --io \N1 -3/J" 00TLET ORIFICE 20 It-c" SCALE 1 "--;-10' APPROVED BY ENGINEERING W(ffin VA (.,,"RAQING 6,UANTITIR`�-, COT. 00 CY nLLb, $0 CY 6KADING Q(AAW'1T1Ei5 AM CA LLOLATJON:� AND V0 NOT ACC-00 ;ro� So 1� 5 W"�,A U 09 � R � N YA(AG CONSTRUCTION SEQUENCE: 1. Pro -construction meeting with owner, contractor, design engineer, and city engineer. 2. Install temporary erosion control measures. 3. Orade, install utilities, detention system and rockery. Place straw or mulch on exposed soil areas. 4. Design engineer shall inspect key project aspects during construction 5. Constructs house and install final landscaping or hydroseed. 6. Remove TESC facilities. I OR GREATER Tt3 — QUARRY ROCK 4" TO 3/4" 12" MIN. 18" MAX. MIN THICKNESS 40% OF HEIGHT OF ROC�ERY CHINK VOIDS, VDIA OR GREATER (bACK SIDE ONLY) NO. 2 COARSE AGGREGATE PER SEC 9-03.1(3)C OF WSOOT STANDARD SPECS. (12" ABOVE PIPE) 0,0000 000 00 0 WRAP PIPE AND AGGREGATE WITH FILTER FABRIC 00 0 0 00 0 0 (MARIFI 140X OR EQUAL) 0 00 0 0 4" DIA, PERFORATED HIGH DENSITY POLYETHYLENE CORRUGATED PIPE WITH SMOOTH INTERIOR. CONNECT TO STORM DRAIN OR AS DIRECTED BY ENGINEER, UNDISTURBED SOIL OR COMPACTED FILL AT 95% MAX DRY DENESTY NOTES: I ROCK FACINGS SHALL BE CONSTRUCTED BY INTERLOCKING THE ROCKS SO THAT EACH ROCK IS IN CONTACT WITH AT LEAST TWO OTHER ROCKS. AND WITH EACH ROCK HAVING A MINIMUM OF THREE BEARING SURFACES. 2 EACH ROCK SHALL BE LAID WITH A FLAT SURFACE ALONG THE ROCKERY AND WITH THE LONG DIMENSION HORIZONTAL, 3 THE DENSITY OF ROCK MATERIAL SHALL BE A MINIMUM OF 160 POUNDS PER CUBIC FOOT. THE SIZE CATEGORIES FOR ROCK SHALL BE AS FOLLOWS: SIZE APPROXIMATE APPROXIMATE WEIGHT — LB. DIAMETER INCHES I MAN ROCK 50 200 1 2 IS — 2 MAN ROCK 200 700 18 28 28 36 3— MAN ROCK 700 2000 36 48 4—MAN ROCK 2000 4000 5—MAN ROCK 4000 6000 48 54 6—MAN ROCK 6000 8000 54 60 4 THE CONTRACTOR SHALL USE THE ROCK SIZES AS SET FORTH IN THE ABOVE TABLE AND SHALL INSURE A DISTRIBUTION OF ROCK SIZES WITH THE LARGEST ROCKS ON THE BOTTOM AND PROGRESSIVELY SMALLER ON TOP. 5 VOIDS IN THE ROCKERY FACE SHALL NOT BE GRATER THAN 50 SQUARE INCHES FOR ROCKS OVER 3 FEET HIGH AND 36 SQUARE INCHES FOR ROCKS UNDER 3 FEET HIGH. NOTES Y & BOUNVAPl PROVIO�_ W( 1. TO POC?RAf H' IDOWNING & &SSOW17ES, 2,. SF -WE k 9, WA-I­F�R DATA r--nq-fNr-_RE0 FROM CITY OF' EDMONDS RF=(ORD3 VISIT LDCATIOR5 ARF_ APPROMMATEP OWNEP,J PEVEL0PC-_.,C"/1w4)L1CA NT. NORTH C-AE5T PEVI�-LOPNENT Ki-Emm" PKE-51,9WT $01 �KO C-�)VIONDS, WA ;6020 TAA PA k_ E. L N 0'. �3-736-005­ 00-7 -1203 SITE " ZOq2O H1LLGk6,<,J PLACE STH`EET FILE REV 1: INCREA5E PETENT104 PIPE SIZE & qT)P SIPREADE TRERCH R FJ:) 'Z) I IN L:i L—=- t- I I I L__ I M-5, fl,O�;Lo, INAKI, VE WA7r -EK FoR."t" tb DONNA Lo bRFESKE- _-P-9h. J _P.M.F 6 62- 1 fv9TFP- 5LOU61+ P-b APR 1 5 2003 �;X/b/+O INI�f+ WA 993VIO SEc, 1$ W.77N.) WA 11 IN- 0 "' UN44--l- I 5 H a--T OF' f FAX I�Z5 - `3r3 _73'd . . . __ . 1� . L F_', - A? ,jEv -f COUNTER S)NGI-ff rAMJL\� L07- C-LEARIJIG, GrRADIN&, TESC, PRAINAGE, SEWER 9,- WATER FOR NORTK CREST DEVE-LOPMEMT 51-OPE > 4o7. AN 5 E-C. 1% T. 27N,) R,i ff,7 W. WAfER & SEWER ONS REaD. INSPECTI RED FIRE AND AID ADDRESS SIGN REQUI E)(T. 1326 -0220 -rd Ia. V051e; A-r 1f(W(v-0C'-f r2t- (,ALL 425-771 AV, .4t. o X i';j :Jll, t,U V1 E 0 AP5 N-12 T`YPE 1-1- ca 4 W/ �y I 1,0 7 k-J) rl MAXIMUm DRivEW A ED I LLOW 1 llff't t677TY "If -?" v- /P' f. � V V) - INSTAL SPREADER TRENCH ERCITYOF EDMONDS �0 RAINAGE WORKSHEEV V: C TbFHR 5TRAW 37D� X E-X 15T I N, BLOWOF N, %WkW -P M I-T OF '-n .N1 U 24, low C", All, .1 . . ......... N #4 v, �'x I$ 4 ......... I A r V K "Z ' T 'N N". 70, "f." xv ? & W/ -3/,+" OUTLET ORIFICE APPROVED AS NOTED BY ENGINEERING Date: -10000--� 01 v FROF05ED 6RADE 4 ISTI N4 ROCKUZY C4 P, A 09 3$9 n-'41064T 5 10 20 130 40 so sEcTi oM SCALF- 1 "-;10' ,ntractor, design engineer, 'es. and rockery. Place straw or t aspects during construction. aping or hydroseed. QUARRY ROCK 4- TO 3/4- AIN. AAX. 'KNESS,r 40% OF OF ROC ERY IDS, 6"DIA OR GREATER )E ONLY) AGGREGATE PER SEC 9-03.1(3)C OF RD SPECS. (12" ABOVE PIPE) 4D AGGREGATE WITH FILTER FABRIC OR EQUAL) )RATED HIGH DENSITY POLYETHYLENE PIPE WITH SMOOTH INTERIOR. CONNECT: AIN OR AS DIRECTED BY ENGINEER. OR COMPACTED FILL DENESTY EACH ROCK IS IN CONTACT WITH AT BEARING SURFACES. ITH THE LONG DIMENSION HORIZONTAL. USIC FOOT. APPROXIMATE DIAMETER — INCHES 12 — 18 1 8 — 28 28 — 36 36 — 48 48 — 54 54 — 60 %BLE AND SHALL INSURE A PROGRESSIVELY SMALLER ON TOP. FOR ROCKS OVER 3 FEET HIGH AND PRoVIDR J�y 2, SEWEI? 9, WATEA DA7A 607'"ERBO FROM CITY OF EPMONDS RECORD,5 & SITE V1617-. LOCAT(OR5 ARE APPROXIMATE-, OWNF=Rj PEVEL0,PC-R/APPL1CA N T. NORTH ckas-r PEVELOP(YIENT R(C-K KLEMM, PRE519W'T R 0. 130'A 340 qq EDMONDS, WA ;8020 PHONE 4-31al TAX PARC-EL NO. �3-73�-005- 00-1 - 1203 0 IV 1 TF- Z0720 4ILLCP,'6S7 PLACF-- EDMONDS WP 5802-0 REV INcREA5E PETEN-no4 FiPE sk5E AvP SIPREAMR TRENCti WE: 340- 03 KREET FILE