21070 88TH PL W.PDF11111111 lill
8537
21070 88TH PL W
STREET FILE,,
ar go - i 9 " -.
City of Edmo*nds
Critical Areas Checklist
The Critical Areas Checklist contained on
this form is to be filled out by any person
prepanng a Development Permit
Application for the City of Edmonds prior
to his/her submittal of a developmcnt-permit
to the City.
The purpose of the Checklist is to enable
City staff to determine whether any potential
Critical Areas are or may be present on the
subject property. Ile information needed. to
complete the Checklist should be easily
available from observations of the site or
data available at City Hall (Critical Areas
inventories, maps, or soil surveys).
RECEIVED
JUL 3 1 1992
.,PERMIT COUNTER
An applicant, or his/her representative, must
fill out the checklist, sign and date it, and
submit it to the City. The City will reviewe
the checklist, make a precursory site visit,
and make a determination of the subsequent
steps necessary to complete a development
permit application.
)With a signed copy of this form, the '
applicant should also submit a vicinity map
of the parcel with enough detail thatcity
staff can find and identify the -subject
parcel(s). In addition, the applicant is
encouraged to include any other pertinent
information or studies in conjunction with
this Checklist to assist staff in completing
their preliminary assessment of the site.
I have completed the attached Critical Area Checklist and attest that the answers provided are
factual, to the best of my knowledge (fill out the appropriate column below).
Owner / Applicant:
Ir T
1A k yy W 1) F- rl�l
Name
Title
J10-76 V)
Street Address
—tA V CA.AA� Uj"'�
City, State, ZIP Phone
Signature
Date
Applicant Representative:
Qw,jgq S. S 1 !1.0 op
Name
Title
Street Address %J
�341 s-7
GA*VLE,"SVV 36' -
City, State, ZIP Phone
OL 2—
Si ep� Date
RECEIVED
Critical Areas Checklist JUL 3 1 1992
Site Infortnation PERMIT COUNTER
Project Name:W; k 0 F-P- rt�"- PermitNumber:
03
Site Location-.5 PE c--�Nf-vt Maae= Property Tax Account Numb
Approximate Site Size (acres or square feet): Y-16 0 Z%k,
Have you filled out a Critical Areas Checklist for a project on this site before?
General Site Conditions tA a tAs
1. Has the site been cleared or logged? Date of most recent action: qA, 2
Soils / Topography AtOF-Ruievo CLtzamg
2. In the Snohomish County Soil Survey, what is the mapped soil type(s)? 2 - 6 67c,
3. Describe the general site topography. Check all that apply.
'/- —Flat: less than 5 feet elevation change over entire site.
'W-A Rolling- slopes on site generally less than 15% (a vertical rise of 10 feet over a
horizontal distance of 66 feet.)
NA. Hilly: slopes present on site of more than 15% and,less than 30% ( a vertical rise
of 10 feet of horizontal distance.)
t\ Steep: grades of greater than 30% present on site.
Comments
Hydrology[Vegetation
4. Site contains areas of year-round standing water: �1 U
5. Site contains areas of seasonal standing water �4 0 ---Approx. Depth:
6. Site is in the floodway () 0 floodplain U0 of a water course.
7. Site contains a creek o . r an area where water flows across the grounds surface? Q oflows
are year-round? Flows are seasonal?
8. Site is primarily, forested -'14.- .; meadow shrubs ---;.mixed /Y\
9. Obvious wetland is present on site:
10. Wetland inventory or ma�D indicates wetlandDresent on site:
v Pool/Hot Tub/Spa Permit
--- Applicatdon Information
Applicatio'n #.. 920721POOL Date— -8/12/92
Site Address... 21070 88th P1 W
Job Name ....... Mike Wilder
Owner T n formation
Name ........... Michael B & 1_1-'andra 1, Wilder
Address ........ 21070 88th P1 W
1414"
Permit 4 ... P-920721FOOL
CityjSt/ZiP .... Edmonds-, WA 98026
Home Phone ..... Work Phone...
Contractor Information
Name .......... Master Pools of'Washington
Address ....... 20031 Ballinger Rd. NE
City/St/Zip ... Seattle, WA. 98155
Unit # .....
ATA# 3?36 005 005 03
Cont #... NASTEPW*1_21RK
Contact._.'... Ralph Simonds Phone ... 365-3337
Architect Information
NaF.Tie .......... Master Pools of Washington Ax c b # ... 365--3337
Address ....... 20031 E;illinger Fd NER
;_ity11St/Zip ... Seattle, WA. 98105
Contact ....... Ralph Simonds Phone ... 365-3337
Engineer Information
N arrie ..........
AddT ess .......
city/St/zip_
Contact ....... Phone ...
rature of Work.. in -Sround Pool
i,,col /Ro-z Lu'j-'.:�."1-%,q Fee. $ 50. GIL",
010i- Fees ......
4'a", Per —
IJ ... . . ....
Engr # ...
fl,"�C F-
STREET FILE
N
1p c-
F
�C T [,,A CK
Fill, 'A
'37
-112a
18
— '-'oulkl
I\In T f-
G R P\ D E
VERY LIT-111,1-
c"'LOPE -1-0
RFAR
q-Vcf E-xt 6
T11: Ic
-1 ", ;
6AL�
10011w,4 mm�rl;4�
hy
F&ON T
RECEIVED
AUG 12 1992
PERMIT COUNTER
1� T& L'L-- T
7-7 C) C)
MASUR POOLS OF WASHINGTON
c��.0770
FILE# N/A
DETERMINATION OF NONSIGNIFICANCE
Description of proposal
Addition to a single family residence
Proponent Mr. & Mrs Mike Wilder
21010 88th Pl. W., Edmonds WA, 98026
Location of proposal, including street address, if any
21070 88th Pl. W, Edmonds, WA 98026
Lead Agency Edmonds Planning Division
The lead agency for this proposal has determined that it does not have
a probable significant adverse impact on the environment. An
environmental impact statement (EIS) is not required under RCW
43.21C.030(2)(c). This decision was made after review of a completed
environmental checklist and other information on file with the lead
agency. This information is available to the public on request.
X There is no comment period for this DNS.
This DNS is issued under 197-11-340(2); the lead agency will not
act on this proposal for 15 days from the date below. Comments
must be submitted by
Responsible Official Jeffrey S. Wilson
Position/Title CurrenT-Planning Supervisor Phone
Address 250 5th Ave. N., Edmonds WA 98020
Date -1 Signature LIZ,
X You may appeal this determination of nonsignificance
to— Hearing Examiner
at 250 5th Ave. North, Edmonds, WA 98020
no later than July 18, 1991
by filing a written appeal citing reasons.
You should be prepared to make specific factual objections. Contact
John Bissell to read or ask about the procedures for
SEPA appeals.
There is no agency appeal.
Compfete this checklist for nonproject proposals, even though questions may be answered "do'�s
not apply". IN ADDITION. complete the SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS (part 0).
For nonproject actions, the references in the checklist to the words "project," "applicant,"
and "property or site" should be read as "proposal," "proposer," and "affected geographic
area." respectively.
A. BACKGROUND
1. Name of proposed project, if applicable:
it 0
2. Name of applicant: J��
--In � 14 —So (2D
3. Address and phone number of applicant and contact person:
-32 q 3 0 P-- ct I S-L
SeaA4-& I
4. Date checklist prepared:
110H
5. Agency requesting checklist:
6. Proposed timing or schedule (including phasing, if applicable):
ck tv( �
7. Do youhave any plans for future additions. expansion, or further activity related
to*or connected with this proposal? If yes, explain.
k1b
8. List any environmental information you know about that has been prepared, or
will be prepared, directly related to this proposal.
Do-e-s k),4,- cQek�
9. Do you know whether applications are pending for governmental approvals of
other proposals directly affecting the property covered by your proposal? If yes,
explain. D"
10. List any government approvals or permits that will be needed for your
proposal , if known.
OP Es tl�� VA. I OC-S � LX I pa", �J
11. Give brief, complete description of your proposal, including the proposed uses
and the size of the project and site. There are several questions later in this
checklist that ask you to describe certain aspects of your proposal. You*do not
need to repeat those answers on this page. (Lead agencies may modify this form
to include additional specific information on project description.)
X
C,
12. Location of the proposal. Give sufficient information for a person to
understand the precise location of your proposed project, including a street
address, if any, and section, township, and range, if known. If a proposal
would occur over a range of area, provide the range or boundaries of the
site(s). Provide a legal description, site plan, vicinity map, and topographic
map, if reasonably available. While you should submit any plans required by the
agency, you are not required to duplicate maps or detailed plans submitted with
any permit applications related to th' h kl*st
E, q�' V 1 -
9, k 0 —10 W . W ,
TO BE COMPLETED BY APPLICANT EVALUATION FOR
AGENCY USE ONLY
B. ENVIRONMENTAL ELEMENTS
1. Earth
a. General de scription of the site (circle on Flat, rolling, hilly, steep
slopes, mountainous, other
b. What is the steepest slope on the site (approximate percent slope)?
c. What general types of soils are found on the site (for example, clay, sand,
gravel, peat, muck)? If you know the classification of agricultural soils, specify
them and note any prime farmland.
S"..4 ��
d. Are there surface indications or history of unstable soils in the immediate
vicinity? If so, describe.
1�0
e. Describe the purpose, type, and approximate quantities of any filling or
grading proposed. Indicate source of fill.
k6 Ke,
f. Could erosion occur as a result of clearing, construction, or use? If so,
generally describe. �0
g. About what percent of the site will be covered with impervious surfaces after
project construction (for example, asphalt or buildings)?
2�,3
h. Proposed measures to reduce or control erosion, or other impacts to the earth,
if any: �A
2. Air
a. What types of emissions to the air would result from the proposal (i.e.. dust,
automobile, odors, industrial wood smoke) during construction and when the project
is completed? If any, generally describe and give approximate quantities if known.
N'-O KO_
b. Are there any off -site sources of emissions or odor that may affect your
proposal? If so, generally describe. N6
c. Proposed measures to reduce or control emissions or other impacts to air, if
any:
3. Water
a. Surface:
1) Is there any surface water body on or in the immediate vicinity of the site
(including year-round and seasonal streams. saltwater, lakes, ponds, wetlands)? If
yes, describe type and provide names. If appropriate, state what stream or river it
flows into. �O
2) Will the project require any work over, in or adjacent to (within 200 feet) the
described waters? If yes, please describe and attach available plans.
1� 0
3) Estimate the amount of fill and dredge material that would be placed in or removed
from surface water or wetlands and indicate the area of the site that would be
affected. Indicate the source of fill material.
4) Wili the proposal require surface water withdrawals or diversions? Give general
description, purpose, and approximate quantities if known.
N 0
5) Does the proposal lie within a 100-year floodplain? If so, note location on the
site plan. NO
6) Does the proposal involve any discharges of waste materials to surface waters? If
so, describe the type of waste and anticipated volume of discharge.
�Ao
b. Ground:
1) Will ground water be withdrawn, or will water be discharged to ground water? Give
general description, purpose, and approximate quantities if known.
'S
2) Describe waste material that will be discharged into the ground from septic tanks
or other sources, if any (for example: Domestic sewage; industrial, containing the
following chemicals ... ; agricultural; etc.). Describe the general size of the system,
the number of such systems, the number of houses to be served (if applicable), or the
number of animals or humans the system(s) are expected to serve.
Rf'�' VV-Q--
c. Water Runoff (including storm water):
1) Describe the source of runoff (including storm water) and method of collection and
disposal, if any (include quantities, if known). Where will this water flow? Will
this water flow into other waters? If so, describe. Ir
2) Could waste materials enter ground or surface waters? If so, generally describe.
t� (3
d. Proposed measures to reduce or control surface, ground, and runoff water
impacts, if any:
R(� V-'Q'
4. Plants
a. Check or circle etation found on the site:
decidu s e. , aspen, other
evergreen treej� pine, other
�rubs
L-qrrs—s
pasture
crop or grain
wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other
water plants: water lily, eelgrass, milfoil, other
other types of vegetation
b. What kind and amount of vegetation will be removed or altered?
c. List threatened or endangered species known to be on or near the site.
t4o V'Q'
d. Proposed landscaping, use of native plants, or other measures to preserve or
enhance vegetation on the site, if any:
5. Animals
a. Circle any birds and animals which have been observed on or near the site or
are known to be on or near the site:
ongbirds other- ju, .......................
birds: hawk, heron , eagle, I
mammals: deer, bear, elk, beaver, other: ....
fish: bass, salmon, trout, herring, shellfish, other: ....................
b. List any threatened or endangered species known to be on or near the site.
K[13-�
c. Is the site part of a migration route? If so, explain.
QCD
d. Proposed measures to preserve or enhance wildlife, if any:
�-t a k\-Q-
6. Energy and'Natural Resources
a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used
to meet the completed project's energy needs? Describe whether it will be used for
heating, manufacturing, etc.
i — �,_4 3 , �,' U-.t Owl
b. Would your project affect the potential use of solar energy by adjacent
properties? If so, generally describe. No
c. What kinds of energy conservation features are included in the plans of this
proposal? List other proposed measures to reduce or control energy impacts, if
any:
7. Environmental Health
a. Are there any environmental health hazards, includinq -7 exposure to toxic
chemicals, risk of fire and explosion, spill, or hazardous waste, that could occur
as a result of this proposal? If so, describe. t�
1) Describe special emergency services that might be required. H
2) Proposed measures to reduce or control environmental health hazards, if any:
H0 V�_Q,
b. Noise
1) What types of noise exist in the area which may affect your project (for example:
traffic, equipment, operation, other)? �AA
2) What types and levels of noise would be created by or associated with the project
on a short-term or a long-term basis (for example: traffic, construction, operation,
other)? Indicate what hours noise would come from the site.
3) Proposed measures to reduce or control noise impacts, if any:
Rc� OQ-
8. Land and Shoreline Use
a. What is the current use of the site and adjacent properties?
b. Has the site been used for agriculture? If so, describe.
c. Describe any structures on the site.
V1
d. Will any structures be demolished? If so, what?
e. What is the current comprehensive plan designation of the site?
h. Has any part of the site been classified as an "environmentally sensitive"
area? If so, specify.
i. Approximately how many people would reside or work in the completed project?
S I * X
j. Approximately how many people would the completed project displace?
14 ('�� KJQ_
k. Proposed measures to avoid or reduce displacement impacts, if any:
Kc) V\.O-
1. Proposed measures to ensure the proposal is compatible with existing and
projected land uses and plans, if any:
9. Housing
a. Approximately how many units would be provided, if any? Indicate whether high,
middle, or low-income housing
\Alt
b. Approximately how many units, if.any, would be eliminated? Indicate whether
high, middle, or low-income housing.
c. Proposed measures to reduce or control housing impacts, if any:
R6VU�
10*.-Aesthetics
a. What is the tallest height of any proposed structure(s), not including
antennas; what is the principal exterior building material(s) proposed?
'9t -
b. What views in the immediate vicinity would be altered or obstructed?
RP--Q,
c. Proposed measures to reduce or control aesthetic impacts, if any:
11. Light and Glare
a. What type of light or glare will the proposal produce? What time of day would
it mainly occur? N
b. Could light or glare from the finished project be a safety hazard or interfere
with views? t\6
c. What existing off -site sources -of light or glare may affect your proposal?
Fq(D
d. Proposed measures to reduce or control light and glare impacts, if any:
N
12. Recreation
a. What designated and
informal recreational opportunities
are in the
immediate
vicinity?
v-46�-
b. Would the proposed project displace any existing recreational uses? If so,
describe. r4o
c. Proposed measures to reduce or control impacts on recreation, including
recreation opportunities to be provided by the project or applicant, if any:
9��i
13. Historic and Cultural Preservation
a. Are there any places or objects listed on, or proposed for, national, state. or
local preservation registers known to be on or next to the site? If so, generally
describe.
b. Generally describe any landmarks or evidence of historic, archaeological,
scientific, or cultural importance known to be on or next to the site.
c-Proposed measures to reduce or co t I impacts, if any:
MASL
14. Transportation
a. Identify public streets and highways serving the site, and describe proposed
access to the existing street system. Show on site plans, if any.
(3 &-�N pt, , CJ - �-
b. Is site currently served by public transit? If not, what is the approximate
distance to the nearest transit stop?
c. How many parking spaces would the completed project have? How many would the
project eliminate?
d. Will the Oroposal require any new roads or streets, or improvements to existing
roads or streets, not including driveways? If so, generally describe (indicate
whether public or private). ft
e. Will the project use (or occur in the immediate vicinity of) water, rail, or
air transportation? If so, generally describe. 00
f. How many vehicular trips per day would be generated by the completed project?
If known, indicate when peak volumes would occur.
I -zu--
g. Proposed measures to reduce or control transportation impacts, if any:
K(-3 V"-Q,
15. Public Services
a. Would the project result in an increased need for public services (for example:
fire protection, police protection, health care, schools, other)? If so, generally
describe.
b. Proposed measures to reduce or control direct impacts on public services, if
any. 90
16. Utilities
electri i y, natural ga
C*rcle utill- �*u ilab14-a--t-fh'e s,ite: 6�
Tu—se--" t��er, septic system, o
b. Describe the utilities that are proposed for the project, the utility providing
the service, and the general construction activities on the site or in the
immediate vicinity which might be needed.
�' (0 V4110 i1a; .0
C. SIGNATURE
The above answer ar _true and complete�tolthe Vest of my knowledge. I understand
it
that the lead ag c is rely)Trg—on o mak its decision.
Signature:.. . ..... .... ... .......................
q,
Date Submi ...................... .....
D. Supplemental Sheet for Nonproject Actions (Rezones, Code Changes, Annexations, etc.) -- Do
not use this sheet for project actions.
Because these questions are very general, it may be helpful to read them in conjunction with
the list of the elements of the environment.
When answering these questions, be aware of the extent the proposal. or the types of
activities likely to result from the proposal, would affect the item at a greater intensity or
at a faster rate than if the proposal were not implemented. Respond briefly and in geni?ral
terms.
1. Now would the proposal be likely to increase discharge to water; emissions to
air; -production, storage, or release of toxic or hazardous substances; or
production of noise?
L KL "J
Proposed measures to avoid or reduce such increases are:
N,, P,!;2-
2. How would the proposal be likely to affect plants, animals, fish, or marine
life? 'C
VA k VI -A
Proposed measures to protect or conserve plants, animals, fish, or marine life are:
N o V'Q_
3. How would the proposal be likely to deplete energy or natural resources?
Proposed measures to protect or conserve energy and natural resources are:
Ncv\�
4. How would the proposal be likely to use or affect environmentally sensitive areas
or areas designated (or eligible or under study) for governmental protection; such
as parks, wilderness, wild and scenic rivers, threatened or endangered species
habitat, historic or cultural sites, wetlands, floodplains, or prime farmlands?
Ir-
M ( L4% I
Proposed measures to protect such resources or to avoid or reduce impacts are:
f(() vl�
5. How would the proposal be likely to affect land and shoreline use, including
whether it would allow or encourage land or shoreline uses incompatible with
existing plans? <
VR ( �k '.
Proposed measures to avoid or reduce shoreline and land use impacts are:
=I
6. How would the proposal be likely to increase demands on transportation or public
services and utilities? JA
Proposed measures to reduce or respond to such demand(s) are:
Kc�
7. Identify. if possible, whether the proposal may conflict with local, state, or
federal laws or requirements for the protection of the environment.
�Ao C,
ENVCHK3/PFORMS
NOTICE:
. N wa r-ra
The -information'shown on the attached
map(s) was compiled for use by the GtY Of
Edmonds/ its Employees and Consultants.
Th,.e City of 'Edmonds does. not. wa rra nt the
t these
accuracy of anything set for. h on . '
Map(s�. An . y person or entity -requesting a
copy should conduct an independent
inquiry regarding the inform'ation shown- on
-map(s)., including,, but not limited to,
t . . n of any sew-er stub shown. Suc-l-
the lociatio
sewer stubs may or may- not e.xist. and may
or may not exist at the location shown.
of Edmonds nor its
Neither the City
ernpl-o-yee-s O*r offi-ce-rs -shatl be 1--icab-1--e for the
information given* on this map(5), nor for
presentation provided based
any one re
upon said map(s),
I . , c, %, APPLICATION
The City of Edmonds for
SEDE SEWER PERMIT
STREETFILEW CONSTRUCTION REPAIRS 0 EASEMENT No . ..........................................
OWNER ....... 14MN MAm-MON
------------------------------------------------------------------------------------------------------- CONTRACTOR ....... ...................................... PERMIT No.
ADDRESS .9.10*70 - Barm -PL...WA ...............
............................................................... ....... LEGAL DESCRIPTION: LOT No.PORT-10R.O.F.*5 BL0CK No . ........ ............................
NAME OF ADDITION.. 'TTN<34M)
_NUSERWCX��0 MWOR *S (We 4
. I I ................................................................................ ............................................
00 4wYO."�,
em
(W Deep)
L,j-
Owe)
4/wRat-AD
ul
VV
Approved:
DATE ..... Pt .. PLM.!�lljl ....... By
.............
CITY OF EDMONDS - SIDE SEWER PERMIT
WATER -SEWER DEPARTMENT
PERMIT
Call 7.76-1107 for side sewer inspections BEFORE covering any portion of the construction.
Inspection will be provided within 24 hours after request. NO Sat., Sun., or holiday inspections.)
ADDRESSLOCA17ON OF CONSTRUCTION .......................................................................................................................................................................
PROPERTYLEGAL DESCRIPTION ....................................................................... ........................................................................ 4 .......................................
..................................................................................................................................................... .................................................... ..................................................
................................................................ OWNER AND/OR BUILDER .............................................................................. .......................................................
CONTRACTOR'S NAME & ADDRESS ....................... .......................... ,
........................................................................... ........... 6� .........................................
Permission Is granted ........... ................................................ 19 ......... for repair and/or connection of a side sewer to the city sanitary sewer
system in accordance with City of Edmonds ordinances.
A' ITION-IS-CALLED TO THE- FOLLOWING:
NL__, No. 1—The owners of the property may obtain a permit to construct sewer inside property line. A licensed Side Sewer Contractor must be employed to construct
side sewer in street area. Do not cover any portion of sewer before it has been inspected.
NOTE No. 2—All. work performed In city right-of-way requires an Invasion of Right -of -Way Permit obtainable from the City Engineer's office.
NOTE No. 3—Obtain full Information regarding Ordinance 11.16.030 and Regulations governing side sewers when you get permit.
NOTE No. 4—Top of side sewer must have at least 30 Inches coverage at property line and 12 Inches inside property line; minimum grade of 2%. No bends In grade
sharper than 1/s will be permitted.
NOTE No. 5--Trenches In street must be water settled and surface of street restored to original condition. Contractors shall be responsible for failure due to Improper
work which may develop within one year of completion.
NOTE3 No. 6—It Is unlawful to alter or do any other work than is provided for in the permit, or to do any work on the main sewer or Its appurtenances except to in-
sert the pipe into the wye.
DISAPPROVEDFj Date ... . ................................... By ................ Date ............... .................. By ................ Date .................................... By ................
APPROVED ,Ft Date ... By ......... .................................................................................
1�- ... * X", - zr
Remarks: ......... ........... / .......................................................... Z�� ........................................................................... I ....................................................
.............................................................................................................................................................................................................................................................
BOTH Permi 0) T Be Signed By wner of Firm Performing Construction PRIOR To Request For Inspection
. .........
I, ; i 3.; - - - �.. Y. ..... .... hereby certify that the side sewer installation constructed under this permit
(Owner of trActi Fir Performing Construction)
W, -istalled in accor ance =h alm1governing ordinances of the City of Edmonds.
Dated this ............ 0 . ......... day of .... ........................................ 197-�!>
V \/ Check BEFORE you dig for: Water F], Gas [3, Telephone [:], Power E], Sew�r [j, Other E] -� V
UNIT 3
DESCRIPTION
THAT PORTION OF LOT 5, SLOCK. 5. ALDERWOOD MANOR NO.-9, , ACCORD G
D IN VOLUME 10 OF PLATS., PACE C, RECORDS
PLAT THEREOF RECORDE
ED AS FOLLOWS:
TON, DESCRISC
OF SNOHOMISH COUNTY, WASH!Nr -E:T OF
WFST CORNER OF THE NOPTH 637.47 FE.-
COMMENCING AT THE SOUTH ALONG T�E WEEST LINE OF SAID LOT 5, A
SAID LOT 5; THENCE SOUTIAIF
TNNING; THENCE
DISTANCE OF 25.00 FEET To T14E TRUE POINT OF BEr'
CONTINUING SOUTH, ALONG SAID wEST I-INE, A DISTANCE OF 136.76
THENCE NORTH, A
STp A DISTANCE OF 100.00 Ft --
FEET; THENCE EA
ki SOUTH LINE
DISTANCF_ OF 135.96 FEET To AN IMTERSECTION WITH THE
ET OF SAID LOT 5; THENCE NORTH 80032137"
OF THE NORTH 602.47 FEc
WESTp ALONG SAID SOUTH LINE, A DISTANCE OF 100.00 FEET TO THE
TRUE POINT OF BEGINNING. INGRESS., EGRESS AND UTILITIES OVER
-TOGETHER WITH AN EASEMENT FOR
FOLLOWING:
THE
9, ACCORDING
THAT PORTION OF LOT 5p BLOCK 5, ALDERW0,OD MANOR �10.
10 OF PLATS, PAGE (). RECORDS
IN VOLUHr
TO.PLAT THEREOF RECORDED
OF SNOHOMISH COUNTY.0 WASHINGTON, DESCRIBED A.S FOLLOW�:
FEET OF
BEGINNING AT THE SOUTHEAST CORNER OF THE mORTH 662.47 TH
-IEST, PARALLEL WITH THE NOR
SAID LOT 5; THENCE NORTH 89"32'37" 'NCE SOUTH,
LINE OF SAID LOT 5p A DISTANCE OF 25.00 FEET; THE
PARALLEL WITH THE EAST LINE CF SAID LOT 5, A DISTANCE OF 90.18
FEET; THENCE SOUTH 59003'(10" vEST, A DISTANCE ' OF 87.45 FEET TO
AN INTERSECTION wITIH THE 14EST LINE OF THE EAST 100.00 FEET OF
nO FEET; THENCE SOUTH,
THENCF WEST, A DISTANCE OF 50.
..SAI r) LOT 5;
THENC7 EASTp A DISTANCE OF 50.00
A DISTANCE OF 23.32 Fr_ 116.60 FEET TO
FEET; THENCE NORTH 59003'00" EAST, A DISTANCE OF
F SAID LOT 5; THENCE �-'ORTH,
-CTION WITH THE EAST LINE 0
AN INTERSC
SAID LOT 5, A DIS.TANCE OF 98.32 FEET TO
ALONG THE EAST LINE OF
THE POINT OF BEGINNING.
I
NOTICE:
-ra7n -Y ... o c u Y
NO war a-ttached
The information shown on the
map(s) was cornpiled for use by the City Of
Edmonds/ its Employees and Consultants.
Th,.�e city of Edmonds does. not. wa rra nt the
t these
accuracy of anything set for. h on
rnap(s�. An . y person or entity *requesting a
copy should conduct an independent
inquiry regarding th*e inform-ation shown on
t5e -map(S), including, but not Jimited to/
the lociation of any sew-er stub shown. Suc
sewer stubs may or may* not e,xist. and may
or may not exist at the location shown.
Neither the City of Edmo-nds nor its
ernpl-o-yee-s o-r offi-ce-rs -s-hal-1 be 1-Ja-b-l-e for the
information given on this map(s), nor for
any one representation provided based
upon said. map(s).
Pi* —The City of Edmonds
APPLICATION
for
SIDE SEWER PERMIT
NEW CONSTRUCTION REPAIRS
OWNER---- ....... ---------------------------------------
ADDRESS ..... ZtO-70 .. ... MIA ..... a..�-WA ........................ .......
t
t
0 1 1 21070 - 86fh Pz- w-
EASEMENT No . ......... ...............
6-
- --I
CONTRACTOR - ---------- ...... ��il .................................. PERMIT No.
LEGAL DESCRIPTION: LOT No. POO __lor../10715BLA)CKNo...�5 ....................................
NAME OF ADDITION . ----- ).44RERM . ......
CStf A77A:��* ......... * ...........
qA"—o
APR 3 0 1973
.000,
110,
100e
110,
Approved:
DATE................................................ By ......................................................................
f
- I
1-7
41-
C04
(7 '217V �L�977L7
I---
Q-NC E-
N
c7A T/ N 6 —
..prOPERT�l LJ.
SET BACK i
is
71X-�
'37
26
NOTE
GRADE
V E R Y LITTLE
FENCE EXISTP106
Li
L-L
U/
/)J-r-Q ELL
-,-� I it 4. -
/;7771 1 � - �IAGE-j
by
50
-- -FA,0N T —
CIO U /H
S TR EE- T_
XMR PM OF WASZNGTON
20031 BALLINGER RD N E
SEATME, WA 981-55
206 o 166,'is "
p iqaQ— wq.�
ro
RECEIVED
AUG 12 1992
PERMIT COUNTER
RECEIVED
APPROVED BY PLANNING AUG 1 2 1992
PERMIT COUNTER
Re.fp4;v- A�K kcil�5
4'ov\*-%'rLk rack-
dL vA evi 6&-lt
I -� � qvLyavre
'10
e-4 k)UL)p, VW
. . . ... ...
000"
C;F*A-G tr-e -&Vr
,Cp
Lcr -�;;' rl-t4
tV '7
t:> - 0:�� coAk Stz) Coe cf 0, 03 .4-7
T-w
Q UpS, Aj ( C.WAV(, VJ L UDrzf-
1'wr7o MItA FL, Uj. coo
RECEIVED
APR 19 1993
PERMIT COUNTER
9
zalll�1114*11;=--- 151,1111=1