Loading...
21103 SHELL VALLEY RD.PDFIIIIIIIIIIIIII 14408 21103 SHELL VALLEY RD ADDRESS: TAX ACCOUNT/PARCEL NUMBER: BUILDING PERMIT (NEW STRUCTURE): COVENANTS (RECORDED) FOR: CRITICAL AREAS: DETERMINATION: 0 Conditional Waiver F] Study Required E] Waiver DISCRETIONARY PERMIT #'S: DRAINAGE PLAN DATED: PARKING AGREEMENTS DATED: EASEMENT(S) RECORDED FOR: PERMITS (OTHER): PLANNING DATA CHECKLIST DATED: SCALED PLOT PLAN DATED: SEWER LID FEE $: LID #: SHORT PLAT FILE: LOT: BLOCK: SIDE SEWER AS BUILT DATED: SIDE SEWER PERMIT(S) #: GEOTECH REPORT DATED: STREET USE / ENCROACHMENT PERMIT #: FOR: WATER METER TAP CARD DATED: LATEMP\DS'Ps\Forms\Street File Checklist.doc tCATC.�A ISA'Slk: X-115 -I no (0 k WOUAL) 30(0" UA L TANDAF�D DRAINAGE PLAN A"TRELT FIL-E 'SLTRATION SYSTEM PAGE I OF Z TOK NC W L&C "a-rH i> "TACNCH cov" ...... T-0i Ar U IN4 K LCvri— TXCNrjq -'�FEXF PIPC CAY TrzF-� w/ 4Low. Lac;s SYSTEM CROSS—SECTION T -5 0 Is - LAYED e W4"—=)��ff [) Ko--K 'TP,EW—VA COVER G RAY E I 4-01Am FEPF P of TRENCH CR-OSS—SECTIO� for T�ft �Iion plan by phone da te pAr DESIGN DATA Trench, Perc LF per Number Rate 1000 sq. t. Imperm Trench Area V Req i2-w , 1118 7 I&S 1. NOTES 1. call Engineering Division (771-3202) for prebackfill and final inspections. 2. Responsibility for operation and maintenance of drainage systems on private property is the responsibility of the property owner(s). Preventive maintenance consists of preventing soil and other materials from entering trench during construction as well as after construction. Catch basins should be cleaned of floating material and sediment at regular intervals (at le!st twice per year). 7 CITY OF EOMONOS r CITY OF EDMONDS CIVIC CENTER * EDMONDS, WASHINGTON 98MO M) 775-2525 COMMUNITY DEVELOPMENT DEPARTMENT May 9, 19 80 Robert Hovde 20427 86th Pi. W. Edmonds, Washington SUBJECT: Dear Sir: aQn,)n 40 STREET FILE HARVE H. HARRISON MAYOR 11 Unit PRD at 2 Shell Valley Rd. ��9 This department is in possession of plans and associated paper work for a project you were contemplating. They have been on file for a period in excess of 180 days during which time no action has been taken. Section 303(c) of the Uniform Building Code 1973 Edition Drovides for the expiration by limitation of a permit application a-fter this time. The plans may be returned or destroyed. Please provide for picking up the plans within ten working days from the date of this letter. Because of limited storage space, unless they are retrieved by you or your agent they will be destroyed. Very truly yours, EDMONDS BUILDING DEPARTMENT Harold Reeves Building Official HR/rm The fee for plan check services performed by the City amounts tot468.00. If you wish to renew your application please remit this amount within 10 days. 1976 EDITION 302-303 The issuance of a nermit based on Ians and s —ifi—tions sh 11 # I 11 11 V . - prevent the Building Official from thereafter requiring the correction of errors in said plans and specifications or from preventing building opera- tions being carried on thereunder when in violation of this Code or of any other ordinance of the city. (d) Expiration. Every permit issued by the Building Official under the provisions of this Code shall expire by limitation and become null and void, if the building or work authorized by such permit is not commenced within 120 days from the date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of 120 days. Before such work can be recommenced a new permit shall be first obtained so to do, and the fee therefor shall be one-half the amount required for a new permit for such work, provided no changes have been made or will be made in the original plans and specifications for such work; and provided, further, that such suspension or abandonment has not exceeded one year. (c) Suspension or Revocation. The Building Official may, in writing, suspend or revoke a permit issued under provisions of this Code whenever the permit is issued in error or on the basis of incorrect information sup- plied, or in violation of any ordinance or regulation or any of the provi- sions of this Code. Fees Sec. 303. (a) Building Permit Fees. A fee for each building permit shall be paid to the Building Official as set forth in Table No. 3-A. The determination of value or valuation under any of the provisions of this Code shall be made by the Building Official. The valuation to be used in computing the permit and plan -check fees shall be the total value of all construction work for which the permit is issued, as well as all finish work, painting, roofing, electrical, plumbing, heating, air conditioning, elevators, fire -extinguishing systems and any other permanent work or permanent equipment. Where work for which a permit is required by this Code is started or proceeded with prior to obtaining said permit, the fees specified in Table No. 3-A shall be doubled, but the payment of such double fee shall not relieve any persons from fully complying with the requirements of this Code in the execution of the work nor from any other penalties prescribed herein. (b) Plan -checking Fees. When the valuation of the proposed construe- tion exceeds $1,000.00 and a plan is required to be submitted by subsec- tion (c) of Section 301,. a plan -checking fee shall be paid to the Building Official at the time of submitting. plans and specifications for checking. Said plan -checking fees for buildings of Groups R, Division 3 and M Occupancies shall be one-half of the building permit fees. Plan -checking fees for all other buildings shall be 65 percent of the building permit fees as set forth in Table No. 3-A. 31 00 CITY OF EDMONDS CIVIC CENTER - EDMONDS. WASHINGTON 98020 (205) 775-2525 COMMUNITY DEVELOPMENT DEPARTMENT DATE: October 12, 1979_ TO Robert Hovde 20427 86th Place West Edmonds, WA 98020 " STREL"T FILE HARVE H. HARRISON MAYOR TRANSMITTING: Fire Department Memo dated 10-9-79 RE: Building permit for PRD in Shell Valley AS YOU REQUESTED: FOR YOUR INFORMATION-XX AS WE DISCUSSED: FOR APPROVAL: FOR YOUR FILE: REVIEW AND COMMENT .... .. . COMMENT AND RETURN MINUTES OF MEETING ....... REMARKS: COMMUNITY DEVELOPMENT DEPARTMENT F Ese j '��qp -4- 0,909 vnr7- 99V av 31IJ Ll cavo-)�3,S, 0 0 E V/ nternational Conference of Building Officials 0 RESEARCH COMMITTEE REPORT 40 0 COMPRESSION PERPENDICULAR TO THE GRAIN FOR GLUED -LAMINATED LUMBER AMERICAN INSTITUTE OF TIMBER CONSTRUCTION 333 W. HAMPDEN AVENUE ENGLEWOOD, COLORADO 80110 1 1. Subject: Allowable compression perpendicular to grain stress F,_Q for structural glued -laminated hem -fir with Douglas fir or arch outer laminations. II. Description: This report establishes allowable co pression perpendicular to grain stress (F,J-) for visually gaded mstructural Flu�d-laminated hem -fir members with Douglas r or larch outer lammations at points of bearing. When at least two 11/2-inch-thick outer laminations of Douglas fir or larch of the same visual grade are substituted for the hem -fir grades required the allowable com- pression stress perpendicular to grain (FcJ-) o? Douglas fir may be used as follows: Dense Douglas fir or larch — FcJ- = 450 psi Close -grain Douglas fir or larch — Fc-L = 410 psi Medium Grain Douglas fir or larch — F,-L = 385 psi Permissible grade combinations remain as required in Table No. 25-11-A of U.B.C. Standards. Allowable unit stresses other than compression perpendicular to grain (F,-L) remain as shown in Table No. 25-C-1 of the Uniform Budding Code. Report No. 3311 February, 1978 III. Evidence Submitted: A discussion on perpendicular to grain stress is submitted. Findings IV. Findings: That allowable compression perpendicular to grain stress (F,-L) for visually graded structural glued-larninated hem -fir members with Douglas fir and larch outer laminations be as set forth in this report subject to the following: 1. At least two Douglas fir or larch IY2-inch-thick outer lam- inations of the same visual grade as required for hem -fir in Table No. 25-11-A of the U.B.C. Standards are substituted for the hem -fir laminations at bearing locations. 2. Where the increased bearing strength is needed on only one face (top or bottom), the Douglas fir or larch is needed on that face only. 3. Where Douglas fir or larch laminations are placed only at points of bearing, the minimum length of the laminations shall be 2 feet. Also, these laminations shall extend at least 1 foot beyond the edge of the support. Drawings of the beam shall clearly show bearing locations and the length of the two outer laminations. End joint spacings shall be main- tained where required. 4. The certificate shall clearly show where Douglas fir or larch is substituted so that field verification is possible. This report is subject to annual re-examination. Page I of I 0 r-] CITY OF EDMONDS CIVIC CENTER - EDMONDS, WASHINGTON 98020 * (206) 775-2525 COMMUNITY DIEVIELOPMIENT D9PARTM9NT DATE:. September 27, 1979 TO: Robert Hovde 20427 86th Place West Edmonds, WA 98020 %STFiELT NLE TRANSMITTING: Engineering Memo regarding PRD at 21103-09-13-17-23-27 Shell Valley Road AS YOU REQUESTED: FOR YOUR INFORMATION: XX AS WE DISCUSSED: FOR APPROVAL: FOR YOUR FILE: REVIEW AND COMMENT: C0114ENT AND RETURN: MINUTES OF MEETING: REMARKS: HARVE H. HARRISON MAYOR �Al-- v---" TO SUBJECT: TUWAY MESSAG�j STREL-T FILE -CEIVED FROM ll..'% -At-- �c� - i L NATE i tu� CL - -7 0 Iota- m r-A -Al"mvnb�cc, E LIT% oc;� T's O.Q. C 2.-, jo 1. (3 C,'3" s — s A — im.vam 4,��qx&ss es G A- / E Ct- a %a 49 c 8 ft3 ncns dLcr- rl., -- &N" IL bzk c- -I-k C-, ,3 %-- s I G N E D R E p L y DATE: ,,, I SIGNED CASCADEG Ll-C2375 PRINTED IN U.S.A. -... - - - -A & 0 DATE: f -:)- - n -� � - -7-'-: 7� 11 1,�: f,o P i ml Development.'. DeplirrmellL n(,e r J i, v) s i nil i c Depar t-men 1) C, r 111 C 'I L i k, C, f j c w r r,� _9,,Z� DATE: 1,FFMO TO: Building Division Community Development Department FROM; Engineering Division Public Works Department SUBJECT: After review of the subject building permit application, we have the following comments: M� ft. nA Eqo-=r- ill 14 NVI)o 11 111CA `)SE (2 t S icr=cs� 4—� cA,\,+. :T!EaA)4--(2 M Lx�\ AA,S= C-A 4 0 * 4 0-0 PUBLIC WORKS DEPART4E:NT CHEdcusT E�11 _�FVRIV106503127R 6 * - h-4FAMM WWI VA , 6 - .601 - 1� I I _ !� IV R-t NE am- 0 Street Right -of -Way Existing����OL Z _FEQD Access Easements Exist1ng__paa__2,g.._� REQD cd Utility Easement Existi Lot Per Subdivision Assessor Map__ Site Plan Checked for Accura Underground W`iring Reqd. 40&M-- Check Accuracy of Legal Descrip"tion_ — Z Review by. Date 6__Q_Va_ :z;t .0 -NOW _24 Existing Water Main Size Water Main Required NIA Service Line Required Hydrant Size Exist Cd Hydrant Reqd Per Fire Code Size Detector Check Meter Reqd. 1YI14 Cross Connection Inspection__0 Fire Department Comments Water 1-bter Char Re d Review by Septic Tank Design Approved Date Septic Tank Permit Reqd. Permit No.' -- Sanitary Sewer Availability_gxz_,__�� Proi Ir Drawing No. 4-w— File No.. Uoe Side Sewer Availability___O*e����� Sanitary Sewer Connection Fee Reqd. ^V :3: Review by, Agrw� Date W Open Ditch Exist* C4"-4 Le I e �; ell, Reqd. S Culvert Reqd. '00" ize, Ap 04 Catch Basin Reqd. 1j. -Indicate an Site Plan 0 Shoulder drainage maintain collection an swale open runoff 0 Manhole reqd. &,the- Indicate on* Site Plan Soil Conditions and Ground Water Field Checked Review by 10� Revised: IvIO-1977 Page 2 Street Paving Reqd. 4?Jar Curb and Cutter Reqd. &2je- Sidewalk Reqd. &0 C.,.;,Zo-o, 1,2 Curb Cut' for Driveway Reqd. pd Right -of -Way Construction Permit Reqd. Bond Reqd. for Public Inprovements Street Nam Sign Reqd. Other Signing Reqd. P, Pre Permit Site Inspection made on z 0 0 F4 BY: S94ER WATER H z STREET ENGINEERING Special Requirements listed in mem to CommLmity DevelopTwnt Department, Building Division BY - Date c) All items filled in on Building Permit Application P4 BY Date P' Drawings Stamped and Notations Made BY Date Approved by Public Works Department Revised: 1v 10-1977 CITY OF EDMONDS sill L`-T FILE BUILDING DEPARTMENT Apartment & Commercial Plan Review Checklist PROJECT ? R'D - �Fm. Ao,4 Ds DATE RECEIVED 8 - 30 - -7 9 - PRELIMINARY FINAL PLAN - ADDRESS V\03— V127 '546L VALL ROAD OWNER Wwr.>E ARCHITECT K t>E lLf:A-TVA;,:p PHONE- -77!5, c73c](7 USE Co tj t> o CODE lq76 FIRE ZONE OCCUPANCY (501) TL— I NO. STORIES TYPE OF CONSTRUCTION --sr-g OCCUPANT LOAD 1. AREAS & VALUATION BASE14ENT G906, SQ.FT.@, \0.10 —SQ.FT.= $ Gq 0 -7 -3c3 lst FLOOR 11 /86-3 SQ.FT.@ k(o 15 -SQ.FT.= $ '415, 455 2nd FLOOR 853-7 SQ.FT.@ 10, SQ.FT.= $ 85 37o GAVLAGS -FtOM 2141- - SQ.FT.@ 5,76 SQ.FT.= $ 1 z) '31 G OTHER--t;,T--ck6 1-7(,q. SQ.FT.@ 3 —SQ.FT.= $ TOTAL: s PER14IT FEE $ -72-c PLAN CHECK FEE $ 468 2. PLUMBING f v�lp I z 5 - - - f '3,1 co 00 NO. FIXTURES 4-3 FIXTURE UNITS ' 1-7 3 DISTANCE TO METER BUILDING SUPPLY SIZE MATERIAL A55 P tlL m qrez5 I METER SIZE PER[4IT FEE $ 2- 8q /77 asd i�uinonu_ building Department Apartment & Commercial Plan Review Checklist 10 40 3. -MECHANICAL HEATING SYSTEM OTHER APPLICANCES PERMIT FEE $ REMARKS 4. 5. 1.1 BASIC ALLOWABLE AREA (Table 5-c) (All floors) (505b) SEPARATION ON SIDES NEAREST DISTANCE (506) % ALLOWABLE INCREASE (506) TOTAL ALLOWABLE AREA (all floors) Sq. Ft.. AREA SEPARATIONS (505d) OCCUPANCY SEPARATIONS (503) EXIT FACILITIES (Chapter 33) NO. REQUIRED EXITS (3302a) WIDTH (3302b)_ ARRANGEMENT & DISTANCE (3302c,d) EXIT DOORS (3303) CORRIDORS (3304) STAIRWAYS & RAMPS.(3305,3306) EXIT ENCLOSURES (.3308) EXIT SIGNS (3312) ILLUMINATION OTHER COURTS) LIGHT, VENTILATION & SANITATION (Chap.6,7,9,10,11,12,13,14) WINDOW SIZE SANITATION —YARDS & COURTS CEILING HEIGHT OTHER 7. FIRE ZONE RESTRICTIONS (Chapter 16) ROOF COVERING OTHER (1603) (4307) -2- tdm6riu ; iwildin'g Deipartment 'kpartment & Commercial Plan Review Checklist 40 DIAPHRAGMS CRAW SPACE (2517) PLATES, SILLS POSTS FOUNDATION VENTILATION EXTERIOR WALL COVERINGS GIRDERS JOISTS I WALL FRAMING BRACING ROOF FRAMING NAILING 13. CONCRETE mix STRENGTH REINFORCEMENT ADMIXTURES TESTS SPECIAL INSPECTION COVER DESIGN CALC'S 14. STEEL & IRON (Chap. SPECS CONNECTIONS SPECIAL INSPECTION COLUMN BASES WELDER QUALIFICATIONS 15. EXCAVATIONS, FOUNDATIONS AND RETAINING WALLS (Chap.29) SOILS REPORTS TESTS SOIL PRESSURE FOOTINGS WALLS PLATES AND SILLS OTHERS -.4- Edmonds Building Department Apartment & Commercial Plan Review Checklist 40 40 8. REQUIREMENTS BASED ON TYPE OF CONSTRUCTION (Chap..17) ELEVATORS (1706) WEATHER PROTECTION (1707 PARAPETS (1709 PROJECTIONS (1710) TOILET FACILITIES (1711) GUARDRAILS (1716) BLDG.CLASSIFICATION(1701) OTHER 9. SPECIAL REQUIREMENTS PROVISION FOR ACCESS BY HANDICAPPED SOUND TRANSMISSION CONTROL (Chap.35 Appendix) STAIR CONSTRUCTION 10. 11. 12. ROOFS GENERAL DESIGN REQUIREMENTS (Chap.23) LOADS (2302) DEFLECTION (2307) WALLS & STRUCTURAL FRAMING SPECIAL LOADS (Table 23-0 ENGINEERING CALCIS ENGINEERING DESIGN MASONRY (Chap.24) REINFORCEMENT MORTAR GROUTING WOOD (Chap. 25) STRESSES IDENTIFICATION BEAM DESIGN COLUMNS CONNECTIONS ANCHORAGE LATERAL SUPPORT -3- Edmonds building Department.- -Apartment & Commercial Plan Review Checklist 40 16. ROOFS ROOF COVERING SHEATHING ATTIC ACCESS AREA SEPARATIONS SCUPPERS NAILING VENTILATION DRAINS SOFFITS 17. FIRE EXTINGUISHING SYSTEMS (Chap.38) SPRINKLERS STANDPIPES MISCELLANEOUS a) INTERIOR WALL & CEILING FINISH (Chap. 42) b) FIRE -RESISTIVE STANDARDS (Chap. 43) b. 1 PROTECTION OF STRUCTURAL MEEMBERS b. 2 CEILINGS b. 3 WALLS & PARTITIONS b. 4 FLOOR -CEILINGS b. 5 OPENINGS* b. 6 DAMPERS c) MARQUES, AWNINGS (Chap.45) d) GYPSUM 14ALLBOARD e) PLASTICS (Chap.47) f) GLASS & GLAZING (Chap.53,State Code) g) SOUND TRANSMISSION CONTROL h) FIRE ALARM SYSTEMS /77 asd S T FILE TREE 6AMA&C W q 817 14 67 -77L WJH A tAV VJ) bAv ICTAL (oo3 G AILAE)e LAV 1( q4o 67 lQK T 0 International Conference of Building Officials RESEARCH COMMITTEE, REPORT PATIO COVERS AND ROOF STRUCTURES T. H. LIKEN & SONS, INC. 3700 EAST 7TH STREET LONG BEACH, CALIFORNIA 90804 1. Subject: T. H. Liken & Sons, Inc., Patio Covers and Roof Structures. Il. Description: The T. H. Liken & Sons, Inc., Patio Covers and Roof Structures are designed for 10- and 20-pound-per-square- foot live loads. The 10-pound-per-s uare-foot patio covers are de- signed for a wind load of 10 pounas per square foot and a wind uplift force of 10 pounds per square foot. The 20-pound-per- square-foot live load roof structures are designed for a horizontal Report No. 3326P March, 1978 wind load of 15 pounds per square foot and a wind uplift force of 18.75 pounds per square foot. Identification: Each structure formed from these components should be provided with a permanent decal or identification tag fving the design loads and the name and address of the manu- a'cturer. III. Evidence Submitted: Details, plans and calculations are submitted. Findings IV. Findings: The subject report complies with the Uniform Building Code. This report is subject to annual re-examination. 1 0 Page 1 of I C, r, Z) 0 TA S S I 1E N T E11V I RO,'1.1 1E'-NTAL PROJE CT Planned -Residential eMlupmen� fur Robert Muvd-e­ DATE SURTITED August 16, 1978 U 10% ff REP T F11 1: VIr. Of Public NV In order to meet the requirements' of Ves State Environmental Policy Act of 1971, the responsible of1ficial must make a declaration of environmental impact as early as possible in the process of evaluating a project. The information in Viis form .,J11 be used to determine whether it will be necess- ary to rejui re an en J ronci�,nta I ii-.ioact s taterient If -ar) impact statement is not required, a Statement of Negative i will be placed in the file. If an impact statement is required, a draft statement must be filed with th i s office, public notice g'iven and a revia..-i period of 30 days allowed. The final statemen't and comments must be filed with the D'apartment of Ecology, Office of tile Governor and t:ie Ecological Commission. .1 The Edmonds Planning Staff will assist you in any way vie can in accumulating th*is information and .,/e would apprec i ate your cooper'ation. I. Land: Area in acres 2.72 Acres Alderwood gravelly loam None for house foundations Soil s type sand and gravel- mixture Limitations and roal construction Description of topography ('/'I slope) Property slopes aenerally to the west at approximately 6 to 12% gradient. There is a drainage swale on the westerly por- tion of the property which will be relocated to accommodate site grading. Grading: estimated cubic /ds. 750 cy - 800 cy I NOTE: If grading or f-',Iling wi IT exceed . 00 Cubic yards Filling: estimated cubic yds . 750 to 800 cy a grading and:' filling plaij 2. Water: must be submitted .-Jith the application. �Stream - estimated flot.: (Cubic feet per second) N/A Will strear,,i be altered?' N/A To What degree? N/A Impact on storm drainage (increase in run-off) Minimql. On.,iL Q_drain2�wi�ll be controlled within the roject by, storm drains and directed into holA-.--g ponds J_ located within the City park. Estimated area to be pave.d 0.40 acros % 14 ercent Estfinated a'rea in open space 1.76 acres % 65 i)ercent Shorelines: within 200.ft. of 11ean llig;ie.r High Water NIA Adjacent to shorelines ione N/A Environmental Assessment, page 2 3. Vegetation: Type of trees fir, a Ider and som e-maple % to be remo-ve.d. 40 percent Minimum diameter of trees to remain 8 inches Ground cover gialal, forest litter. -some % to be removed 50 percent brush Proposed landscaping, if any Lawns and ornamental shrubs will be planted pur- suant to construction. 4.- Existing Land*Use within 300 ft. radius of proposed development: Single Mu I ti - Vacant Family Fami 1 y Comm. Other North X South X X P.R.D. East X Wes t Park 5. 'Circulation: Estimated increase in auto trips daily 14 D. U. I s X 4 ATD I s = 50 ATD I s F.stimated dep,,,nd for public trans portati OP 14 additional family units Degree of change on adjacent streets moder ate; adjacent 'streets are capable of accommodating increased traffic volume3. 6. A'rea of imnact: neighbo-hood —Significant, as. to adjoining properties cityw-wide In -sign ficant regional Non6 7. Effect on air quality: Insignificant 8. thanges in noise generation: Minor I I I T ENVIRONMENTAI, CHECKLIST FORM Introduction: The State Environmental Policy Act of 1971, Chapter �_3 , RCW, requires all state and local governmental agencies to consider environmental values both for their own actions and when licensing private proposals. The Act also requires that an EIS be prepared for all major actions significantly affecting the quality of the environment. The purpose of this checklist is to help the agencies involved to determine whether or not a proposal is such a major action. Please.answer the following questions as completely as you can with the information presently available to youi Wherel.explanations of your answers are required, or where you believe an explanation would be helpful ­to government decision makers, include your explanation in the space provided, or use' additional pages if necessary. You should include references to any reports or stucles of which you are aware and which are 'relevant to the answers you provide. Com- plete answers to those questions now will help all agencies involved with your proposal. to undertake the reouired environmental review without unnecessary delay. The following questions apply to your total proposal, not just to the permit for which'you'are currently app.lying or the proposal for which approval is sought. Your answers should include the impacts which will be caused by your proposal when it is, completed, even though completion may not occur until. sometime in the future.. This will. allow all of.' the agencies which will be involved to complete their environmental review now, without duplicating paperwork in the future. NOT E : This i-s a standard form being agencies in the State -of Washington Many of the questions may not apply does not apply, just answer it "not on to the next qUEStions. A. BACKGROUND used by all. states and local for various types to your proposal. applicable" (n/a) of proposals. If.a question and continue 1. Name of Proponent Robert Hovde 2.' AddrLlss and Phone Number of Proponent .20427 - 86th Place W., Edmondg, Wa. 98020 Ar-,ents l,ovell-Sauerland & Associates, Inc 23106 - 100th Ave. W., Edmonds, Wa. 98020 Tel.: 775-1593 3. Date Checklist Submitted Aui_�ust 17, 1978 4 . Agency Requiring Checklistcity of f-.dinonds 5. Name of Proposal, if applicable: A planned residential development for Robert Hovde 6. Nature ancI Brief Description of the Proposal (including but not limited to its size, general design elements, and other factors tha ' t will given an accurate undE,rstanding of its scope and nature: The proposed action involves subdivision of a 2.72 acre tract utiliz- ing the Planned Resi�ential Development concept and will incorporate Ili dwelling tinits situated in both single and multiple d elling unit buildings. 7. Location of Proposal (describe the physical setting of the proposal, as -well as the extent of the land area affected by any environmental impacts, including any other information needed to give an accurate understand- ing of thE environmental setting of the proposal): This projec is situated on a wooded hillside in Shell Valley on the north side and at thc westerly terminus of Shell Valley oad. The aLolperty is located northof Sihell Park, a plan ed! residential develop- ment, and easterly of Yost City Park. -1- Estimated Date -for Completion of the Proposal: June 1979. 9. List of all Permits, Licenses or Government Approvals Required for all Proposal (federal, state and local -- including rezones): 1. Approv.1 of P.R.D. and final subdivision approval by City of Edmonds. 2 Issuance of residential building permits by City of' Edmonds. 10. Do you have any plans for future additions, expansions, or further activity related -to or connected with this proposal? If yes, explaln: No ll.. Do you know oT any plans by others' which may arfect the p.�,operty covered by your proposal? If yes, explain: No 12. Attach any other application form that has been com- pleted r6garding the proposal; if none has been com- plated,.but is expected to be filed at some future date, describe the nature of such applIcation form: See attached Subdivision Application and Environmental Assessment. B. ENVIRONMENTAL IMPACTS (Explanations of afl "yes" and "maybe" ahswers are -required). YES MAYBE NO 1. Earth. Will the proposal result in: a. 'Unstable earth conditions or in changes in geologic substructures: b. Disruptions, displacements, com- paction or overcovering of the soil? X C. Change in topography or ground surface relief features? X d. The!destruction, covering or modification of any unique geologic or physical features? X_ e. Any increase in wind or water erosion of soils, either on or off the site? f. Changes in deposition or ero- sion of beach sands, or changes in siltation, deposition or erosion which may modify.the channel of a river or*stream or the bed of the ocean or any bay, inlet or lake? X. Explanation: Cradinp, and fillinE win occun in connection with-coad construction and in preparation of building sites and attendant d r �, yes 4 -2- 2. Air. Will the proposal result in: Yes Maybe No a. Air emissions or deterioration of' ambient air quality? X b. The creation of objectionable odors? X C. Alteration of air Imovement, moisture or temperature,. or.a.ny change in clim6te, either locall� .,or regionally? X Explanation: - Duri ne, cons trurtion ohjPrtionahIp encountered at the time of street and oriors may he -driveway 3. Water. Will the proposal result:in: paying- a. Changes in currents, or the course or direction of water move- ments, in either marine or fresh. waters? X b. Changes in absorption rates, drainage patterns, or the rate and amount of surface water runoff? X C. Alterations to the course or flow of f000d waters? X d; Change in the amount of sur-' face water in any water body? X e. Discharge into surface waters., or in any alteration of surface water quality, including but not limited to temperature., dissolved oxygen.or turbidity? X f. 'Alteration of the direction or rate of flow of ground waters? X g. Change in the quantity of ground waters, either through dire-ct additions or withdrawals, or through interception of an aquifer by cuts or excavations? X h. Deterioration in ground water quality,.either through direct in- jection, or through the seepage of leachate, pho.sphates, detergents, ,waterborne virus or bacteria, or other substances into the ground waters? X i. Reduction in the amount of water otherwise available for public water supplies? X Explanation: Drainage pattern and run-off _c3`Fs_E_ru7_JT r9te will be minimally impacted by the on of streets, drivew-a-y—s-7-nd 'buildings. Storm water run-off-w-1-11 be-cont—ro-TI—ed within th� project by an interior storm drainage system and directed into holding ponds located within the City park -3- 0 0 Flora. Will the proposa!L in-. Yes Maybe No a . Change in the diversity of species, or numbers of any species of flora (including trees, shrubs, grass, crops, microflora and aquatic plants)? b. Reduction of the numbers of any unique, rare or endangered species of flora? X C. Introduction of new species of flora into an area, or in a barrier to the normal replenish- ment of existing species9 X d. Reduction in acreage of any agricultural crop? X Explanation: Lands*caping around dWE!llings and open spaces will intro- duce new species -of 1'lora in addit—lon to the existing natural vegeta ion. Fauna.- Will the proposa.-, result in: a. Changes in the diverc-,.ty of species,.or numbers of any species of fauna (birds, land animals includi.ng reptiles, fish and shell- fish,'benthic organisms, insects or micro'fauna)? X b. Reduction of the numbers of any unique, rare or endangered species of fauna? X C. Introduction of new species of fauna into an area, or result in a barrier to the migration or' movement of fauna? _X d. Deterioration to existing fish or wildlife habitat? X Explanation: Res ident fauna will be displaced in developed areas and existing feed an-d —cove-F-aecreaned in quantity-7 Noise. 'Will the proposal increase exis.ting noise levels? X Explanation: Noise level�-,-will increase minimally as would be 'normal to a residential7-park-H—Ousing '14 family units. Light and Glare. Will the pro- posal produce new light o-.:, glare? Explanation: New light ancJ glare will be produced by house, street and yard iliumInation. 0 �7� Yes Maybe No 8. Land Use. Will the proposal result in the alteration of the present or planned land use of an area? _X Explanation: The site is Presently -undeveloped. The -Proposal will not conflict with the comprehensive pla;i for this area, 9. Natural Resources. Will the pro-. posal result in: a. Increase in the rate of use of any.natural resources.? X b. Depletion of any nonrenewable natural resource? X Explanation: Home construction will�increase use of materials and energy of the Puget Sound area. Domestic water and electricity will be consumed by the inhabitants. 10. Risk of Upset. Does the proposal involve a risk'of an explosion or release of hazardous substances (including, but not limited to, oil, pesticides, chemicals or radiation) in the event of an accident or upset conditions? X Explanation: Limited to potential construction accidents. 11. Population. Will the T)roposal alter the location, distribution, density, or, growth rate of the human population of an area? X Explanation: Resulting alteration will be limited to the immediate neighbor -hood. 12.. Housing. Will the proposal affect existing housing, or create a demand for additional. housing? X Explanation: Upon completion, 14 new living units will be available for habitation. 13. Transportation/Circulation. Will- the.proppsal result in:. a. Generation of Additional vehicular movement? b. Effects on existing'parking ZD facilities, or demand for new parking? c. -Impact upon existing transpor- tation systems? . d. Alterations to present patterns of circulation o:, move- ment of people and/or goois? X X X X Yes Maybe No e. Alterations to waterborne, rail or air traff"c? X f. Increase in traffic hazards to motor vehicles, bicyclists or pedestrians? Explanation: Newly generated traffic and related added hazard will be limited to the neighborhood streets. 14. Public ServIces Will the'pro- posal have an effect upon, or result in a need for new o r alvered governmental services in -any of the following areas? a. Fire protection? X b. Police protection'? X c. Schools? X d. Parks or other recreational facilities? X e. Maintenance of public facill.- ties, including roads? X f. Other governmental services? �xplanation: Existing services have the capacity to absorb the increased need. 15. Energy. Will the proposal resull. in: a. Use of substantial amounts o'L" fuel or energy? b. Demand upon existing sources of energy, or require the develop- ment of new sources of ehergy? _X Explanation: Electrical energy wi be u, 11 ged for heating and illumination suUplied -via existing.-di-s-trihiltion nf nmpio capacity. 16. Utilities. Will the proposal result in a need for new systems or alterations,to the following utilities: X a. Power or natural gas? X b. Commiinicati-ons system.3? X c. Water? X d. Sewer or septic tanks? X e. Storm water drainage? X f. Solid waste and disposal? X Existing utilities have ample capacity to serve the completed subdivision. The development will necessitate only those minor alterations to the existing Utility system as are required to serve this subdivision. -6- Explanation: 17. Human Health. Will the proposal result in the creation of any health hazard or potential health hazard (excluding mental health)? Explanation: 18. Aesthetics. Will the proposal result in the obstruction of any scenic vista*br view open to the public, or will the proposal re-, sult in the creation of an aesthetically offensive site open to public view? Explanation: Yes Maybe No X_ 19. Recreation. Will the proposal result in -an impact upon the quality of quantity of' existing recreational opportunities? X Explanation: 20. Archeological/Historical. Will the proposal result in an alteration of a significant archeological or his- torical site, structure,, object or buildin.g? X Explanation: C. SIGNATURE I, the undersigned, state that to the best of my knowledge the above information is true and complete. It is understood that the lead. agency may withdraw any declaration of non -signi- ficance that it might issue in reliance upon this checklist should there be any willful misrepresentation or willful lack of' full disclosure on my part. Proponent: 0 M .0 I TY 0 F E D M 0 N 0 S TO: rot k VL ee"'(1 Lu 0 SUSPENSE DATE: MAYOR As We Discussed Investigate and report Take Appropriate Action x Prepare Letter/Memo fc�r My Signature' Mayor's Signature Previously Ref'd Status of Action? For your Information Note & File Return to: MAYOR'S ADMIN. ASS'T. CHIEF of POLICE CITY ATTORNEY CITY CLERK COMMUN. DEVELOP. DIR. FINANCE DIRECTOR FIRE CHIEF PUBLIC WORKS DIRECTOR COMMENTS: P I mm if6 for', FROM:2U� DATE: T-S-79, ;*HE P I -;111110d e U0.7TED_Aujr,us,t j(), 19'(8 SPIEL` T F I L E onmental Policy Nct of 1971, envi�ronmental impact as early ne whether it will be necess- ?�aTF17P..T,l�t—s—ta-�LL,ir,ent—is - 11 be placed in the file. t MLISt be filed win t;lis ) days allm,.,ed- The 'final lient of Ecology, Office of j , vie can in accumulating Ition. None for, house foundations OnS and road cOnstr'uCtion at �ge 3Wale on t-he westerly por- omiodate site pr6ding. OTE: If grading or f4lling I IT exceed D-00 cubi c yards orading and fill-hir, ol,111 St 'JC� JLlbilli tted �.ji Ul the ppl ication. N/A iiinal.. Onsi (-, .L_�ArairjjLiLre will I directed into'h Mini . ponds llljk� �;_LLy P'11.1(.- - . --:L i ma t L I aroa U) b0- paved �,o Es t )crcen t Lstilnated a'rea in 0j)en space I - 76 65 percen t ShOrcl illOS Within .200 Jt. of '1(�, t e r N/A r High Ila,, Adjacent to Shorel i lies Z*0111? J` thc en vi. r-onmen t a.]. s e t- t -1 ng o f t he propos a I 'LLi i L;__j _LLituated on a wooded hillside in Shell Valley on the north ,,ide mid at thc we!-fter]v ter-rlli nll:,,, or. Sholl Val.ley 1-oad. 'Phe L!L�J)(..-I-ty i:i locat.ed not-1,11 0.1 ;hull Park, a plarned*re.,ii(I(iitial duvelop- uictit, and easter,ly of' Yost City Parl<. -I-