Loading...
21109 SHELL VALLEY RD.PDFiiiiii 11111111 13045 21109 SHELL VALLEY RD �o ADDRESS: IJ161 0 � TAX ACCOUNT/PARCEL NUMBER: M7 4 BUILDING PERMIT (NEW STRUCTURE): C�70 9!� COVENANTS (RECORDED) FOR: CRITICAL AREAS:. DETERMINATION: E] Conditional Waiver [] Study Required aiver L Xw DISCRETIONARY PERMIT #'S: DRAINAGE PLAN DATED: PARKING AGREEMENTS DATED: EASEMENT(S) RECORDED PERMITS (OTHER) PLANNING DATA CHECKLIST DATED: SCALED PLOT PLAN DATED: SEWER LID FEE SHORT PLAT FILE: SIDE SEWER AS BUILT DA SIDE SEWER PERMIT(S) GEOTECH REPORT DA STREET USE / ENCROACHMENT PERMIT #: FOR WATER METER TAP CARD DATED: LID LOT: BLOCK: LATEMP\DSTs\Fomis\Street File Checklist.doc -,To 25 CITY F - ONDS JOB AODRESS T/ Y/ IA- Tle: �v PERMIT APPLICATION CONSTRUCTION L tmEss) SUS jSQN NO NAME (OR NAME OF 6" LiGAL ­7 -1, .. / � Z_ M G ADDRESS Z A LIN PUBLIC RIGHT 01 WAY PEP. OFFICIAL STREET MAP. a L.16-r Ulg,u I)EDICATION 0 P �MSTING CITY �ROPOSEr1_?F_.1Vk1;? STRUCTION PERVIT REGUIR!'D - NAME FIGHT C-F WAN CON STREIT L!SEpERMIT REOUIRCD MEMO DATED SEE ENGINEERING A. ADDRESS 11111A 11 cc CITY 4 (,I 14_5 �yg A I'L FIXTURE UNI_-S cc 13UILDING,CUPPLY 2E METZR ZE ADDRESS 0 'MLEPHONE NUMBER REMA�_A CIT� AOB NO. V ENv. REVIEW 7. SIGN AREA OF Cc PLETE E)(EMPT 100 STATE LICENSE NU 'ABER ALLOWED PR OSED s,10 SLINE" T- ;'. _Je�-_­.; v D 6- property-inclu e a C-k T Le at DeSC6 p 111: our copies) J�A ts� 'De ttach 0'-ANNING RE I I t ow of a VARIANCE OR Cu VIE >A Hrlr.�T LOT CO F�RAG Z YAROS� et V, I EAR SIDE FRONT:' REMARKS PLUMBING 2S, Fw �RESIOINIIAL AL -CHANICAL :rAAL I [] " 11 C1A..IAL Ell LQ_Eo_--"R --.— OF CONSTRU TION CODE 11 SIGN Typr P.�_TAINING WALL nHECKCD E-Y [3,EPAIR 11 0 FENCE lqf"5 I EXCAVATE _FT, A _3 LOADPAN ARE ORCU DEMOLISH OR FILL SPECI INSPECTOR G ou P -MOVE INSP.j o []101E rp-O . L C ML, A", 'NSP. REMODEL REMARKS R-E-AL WOOD S'OVE [] APT. BLOG INSERT NUMBEROF -S 0 - NUMB OF SIORIF I WELLING UNITS ACH PLOT PLAN) t to 12 NAIUR OF W RK To BE DONE tATT FEE VALUATION PLAN CHECK FEE BUILDING PLUMBING MECHANICAL ne n Frivale property ONLY. GRADINGIFILL p,,rmit C rs work to be do , I. This truCtiOn on the publicdomair, (curtS, side�la ��05 STATESURCHARGE Any cons ' Vill T; Quire separate perm's I driveways. marquees, etc.) k ENERGY CODE permit Application! 180 Days is Started Within 180 Days Permit Limit' 1 -year. Provided Work e heirs assigns and, "APplican If of his Cr oheirnsPOu clei�nd and hold 0 interest, d, dem , agrees i ts Officials' successors in Washington, t of Edmon s, clairrs for da ages Of harmicss the y m Brice employees and agents from any and �11 ' I� PLAN CHECK y or indirectly from Tede'esned ature aris�ng direcil hall not be whatever n . e of this permit. I�Ssuance Of this Permit St of any city o,d!lanc T modify, waive or reduce any irequiremen' y ordinance 'TOTAL MOUN nor limit in any way the City's ability to enforce Wl APPLIrATION APPROVAL 'on provis, BPP �a,,O,, tht the ATTENTION 71.dg. that I have r?ad this ' e duly kilon is not a permit until 1 hereby acX'10' t- and that I am the owner, or th PERMIT This aPPIiCE c Comply With city and THIS information given is cOrrec - t AUTHORIZES silned by he Building official or his of the owner. 1 agree h I"I ONLY THE DeputY; and 1�nd.receip% is and in doing the work aut fees are paid. a. _ authorized agent "d d. ogulating construction the I-dbor �ORK NOTED I slate laws r a rn�loyed in violation 01 o achnow edged in Space Pro' ed thereby no person will be to Workmen's Compen9a* 'NS'ECT. ,NsPECTION DATE .'PAR, Washington relating F"� Code of III; state of �DA%F. *IGuED , N1 T RE ce. CITY 0. C .v ti. n Insuran ,NER OR AGLNTI IGNATU E I Y. 7 EDMONDS 0 ATY. 771-3202 T," ION File YELLOW — inspector A OR OCCUPY A BUILDING OR STRUCTURE ORIGINAL — I T III L, L UL TO USE HAS BEEN MADE AND APpRCIVAL Oil PINK — O�-ner GOLD — AssensOr F AL IN' ECTION GRANTED. UBC UNT NF E OCCUPANCY HAS. FEEN 01 /Z A E;j IF CAT CHAPTER 3- it"d NO.. gloom 1,741 1 :If ttt'_ ,U , , .- �� . i . . I - , 1� R 'M 14 a4. 3, d—A q. T. D I AO 130-00 6 FILE No. 1/'7 qAtical Areas Checklisfo -------------------------------------------------------------- Site Information (soils/ topography/hydrology/vegetation) 1. Site Address/ Location: 2. Property Tax Account Number: 3. Approximate Site Size (acres or square feet): p T Z 4. Is this site currently developed? _ L-'yes; _ no. If yes; how is site developed? KX-w)Z,�j7-YAC 14ceis-,-,-, 5. Describe the general site topography. Check all that apply. Flat: less than 5-feet elevation change over entire site. Rolling: slopes on site generally less than 15% (a vertical rise of 10-feet over a horizontal distance of 66-feet). Hilly: slopes present on site of more than 15 % and less than 30 % a vertical rise of 10-feet over a horizontal distance of 33 to 66-feet). Steep: grades of greater than 30% present on site (a vertical rise of 10-feet over a horizontal distance of less than 33-feet). Other (please describe): 6. Site contains areas of year-round standing water: Approx. Depth: 7. Site contains areas of seasonal standing water: AL0 ___- Approx. Depth: What season(s) of theyear? 8. Site is in the floodway_,&�� floodplain- of a water course. 9. Site contains a creek or an area where water flows across the grounds surface? Flows are year-round? 41,�j Flows are seasonal? (What time of year? J. 10. Site is primarily: forested meadow shrubs mixed urban landscaped (I'awn,shrubs etc) e' 11. Obvious wetland is present on site: _Aln City Staff Use 1 Site is Zoned? 2. SCS, ma'pped soil t�pe�s)?'. :A vt�cli-,�ocqv e%"ww%A_-,e 3. Wetland inven* tory or C.A fiiai� indicates w!etland present on site? %a i Areas iriv'e" C.A., *map indik'ates Critical'Area on Th TL 4. C:ifica htory or, site? 0.41P ETC)$ 10, -0i 5. ::,Site�w*th' d subsidenceJandsh azard area? fl, in esignat6deaiifi . ide h o e Eriiiir6niiieiiii�y*.:�e ated. fith. ...tive Areas Map? —�A-" ��6m bE* T+'E.'RMINATIO N­ '1cA_xh1Ldoc; Rev 02/11/97 JR. City of Edmon'ds Critical Areas Checklist '4C. 10%3 The Critical Areas Checklist contained on this form is to be filled out by any person preparing a Development Permit Application for the City of Edmonds prior to his/her submittal of a development permit to the City. The purpose of the Checklist is to enable City staff to determine whether any potential Critical Areas are or may be present on the subject property. The information needed to complete the Checklist should be easily available from observations of the site or data available at City Hall (Critical Areas inventories, maps, or soil surveys). An applicant, or his/her representative, must fill out the checklist, sign and date I it, and submit it to the City. The City will review the checklist, make a precursory site visit, and make a determination of the subsequent steps necessary to complete a development permit application. With a signed copy of this form, the applicant should also submit a vicinity map or plot plan for individual lots of the parcel with enough detail that City staff can find and identify the subject parcel(s). In addition, the applicant shall include other pertinent information (e.g. site plan, topography map, etc.) or studies in-conj unction with this Checklist to assist staff in completing their preliminary assessment of the site. I have completed the attached Critical Area Checklist and attest that the answers provided are factual, to the best of my knowledge (fill out the appropriate column below). Owner/ Applicant: - '11 1 Name Zj I r4-1S&:& 4- V,'4u,,-L--z "-*71 Street Address -If �0� 41A City, State, ZIP 776—SMI Phone gf-gna-tuire Date Applicant Representative: Name Street Address City, State, ZIP Phone Signature Date PiR V) cc CITY o,' EDJW OrNS For InApection Call 771-3202 NO 11111 ; 1V IMMARQ SIPj' SEWER PERMIT 1�R 2 9 1987 PERMIT NO. 076,617 PURUC WORKS, Address of Construction: L V,,9,1 /_ 4- Property Legal Description (Include all easements): -2 ;7- 0 Af 67 #2? 762/2 Owner and/or Builder: Contractor & License No: K J, &AI 7- z,3 2_' 0 C_ Single Family Residence :STREET FILE Multi -Family (No. of Units Commercial (No. of fixture Units 1. Invasion into City Right -of -Way: No Yes (If Yes, Right -of -Way Construction Permit required. Call One -Call -Center (1-800-424-5555) before any excavation.) Cross other Private Property: No Yes (If Yes, easement required, attach legal description and county easement numberi.) PLEASE READ THE ITEMS LISTED ON THE BACK I certify I have read and h —at Z':?J4 7 shall comply Da fe with the items listed on the back. Permit Fee: 30. 00 Issued By: Trunk Charge: Date Issued: Assessment Fee: Receipt No.: 00f Z_ Partial Inspection: Comments Date 5iti Final Inspection Approved: _4��f -2 a e Initial Rejected: Reason nm+- T 4,94 PERMIT MUST BE POSTED ON JOB,SITE-** White Copy - File Green,Copy - Inspector , 11'' t The City of Edmonds Side Sewer Drawing EASEMENT NO - -------------------------------------------- A NEW CONSTRUCTION IN REPAIRS LID NO . ............... ... ASMT. NO - ------------------ OWNER Akn --- ) ........ S WN: �k'lk., %'L S. 5 ........................................... CONTRACTOR V-- In ---------------------------- ----- ---- - ------------------------- PERMIT NO. - ------------ LEGAL DESCRIPTION: LOT NO . ..... a JOB ADDRESS 2�M.pl ----- 5Rfl . . ..... NA�47-� ........ -- ------------------------------ BLOCK NO. ------- 4% uj 0 �j PWW-0001 -11175 (REV. 11/78) NAMEOF ADDITION --------------------------------------------------------------------------------------------------------- E 6 -0 --- b S TR--lA'!f�-iENl- PLANT 0, ;k, c-p Approved: DATE....................... By ..... J/ -j %4) 0 EIR-ItECEIVED Return AddreAN 3 1 2012 City Clerk City of 121 - 5&0'T%S CITY CLERK Edmonds, WA 98020 Property Address: None 122 2 PGS rj 'I I Tl 21'1'19016 NGT SNOHOMISH COUNTY, WNHI" ON -:9- // 0 9 Ni LD wal DEC 28 2011 KIRKE SIEVERS, Snohon�A Counly Trermr By KIRKE SIEVERS.. Assessor's Property Tax Parcel Nos.: 00373600500713, 00373600500714, 00373600500715 IN CONSIDERATION of benefits to accrue to the grantors herein, the undersigned, Scott A. Mi , hereby grant to the CITY OF EDMONDS, a Municipal Corporation, a permanent easement for the installation, construction, operation, maintenance, repair, reconstruction or replacement of a waterline conveyance pipe and necessary appurtenances, over, across , through, and below the following described property, and the further right to remove trees, bushes, undergrowth and other obstructions thereon interfering with the location, construction, operation, maintenance, repair, reconstruction or replacement of said waterline conveyance pipe and necessary aj3purtenances, together with the right of access to the easement at any time for the stated purpose. The easement hereby granted is located in the COUNTY OF SNOHOMISH, STATE OF WASHINGTON, described as follows: THAT CERTAIN PRIVATE ROAD OVER LOT 7, BLOCK 5, ALDERWOOD MANOR NO. 9 DESCRIBED AS THE SOUTH 50 FEET OF THE EAST 135 FEET OF THE NORTH 330 FEET, AND THE WEST 50 FEET OF THE EAST 135 FEET, EXCEPT THE NORTH 280 FEET THEREOF. The easement area is depicted in the drawing attached as Exhibit A. THE CITY agrees to restore to substantially the original condition such improvements as are disturbed during the construction, maintenance, and repair of said utility or utilities, provided the grantors, their heirs, or assigns shall not construct any permanent structure over, upon, or within the permanent easement. DATED THIS _ STATE OFQ&�61--g )ss COUNTY OF SNO�d, M ,O� On this day personally appeared before me Scott A. Miller to me known to be the individual described in and who executed the within and foregoing instrument and acknowledged that they signed the same as their free and voluntary act and deed, for the uses and purposes therein mentioned. �THIS 20 UNDER MY HAND AND OFFICIAL SE4 I OFFICIAL SEAL NPTARYPUBLIC!'n7an for-ti JAIME SUMPTER S�ate of N� i mt�� esiding at NOTARY PUBLIC OREGON COMMISSION NO. 432921 MY COMMISSION EXPIRES OCT 13 201 EXHIBIT A MAIN ST Lot 7, Alderwood 20901? Manor No. 9 20914 cz. "���Dasement 21105 21109 21113 CITY OF EDMONDS ASSET INFORMATION SHEET 12/NEW 11 ADDITION El RETIREMENT STRELT FILE ASSET NO. ADDITION TO ASSET NO. DESCRIPTION SERIAL NO. LOCATION DEP;(. NO. PURCHASE ORDER NO. PURCHASE ORDER DATE COST B.A.R.S. ACCOUNT NO. ESTIMATED LIFE PROJECT NUMBER PROJECT COMPLETION DATE COST 0�, INITIATED BY DATE APPROVED BY "SUBMIT ASSET INFORMATION SHEET WITH FINAL PAYMENT REQUEST *SUBMIT ASSET INFORMATION SHEET UPON CLOSE OF PROJECT ACCOUNTING ONLY a -DEPRECIATE MONTHLY DEPRECIATION AMOUNT ANNUAL DEPRECIATION AMOUNT G.L. ENTRY REFERENCE t(p) INITIAL DATE VERIFIED BY PROCESSED BATCH NO.- 0 MEMORANDUM April 6, 1987 TO: Project File FROM: Jerry Hauth, Hydraulics Engineer SUBJECT: DETENTION PIPE (JIM SMITH'S SHORT PIAT) On March 2, 1987, 1 inspected the interior of the 36" detention pipe installed in Jim Sndth's short plat. The gaps at the joints, discovered on previous inspections, have been covered with an asphaltic emulsion. This material was of a runny consistency, and, consequently, it is impossible to determine if this will be a satisfactory plug for the gaps between the pipes. The intent is to stop the pipe from leaking.- (See the attached letter to Jim Smith for a history of this pipe.) At the present time, I feel this may be the best product we can get with the given circumstances. I recomnend that we accept the pipe, aware of the existing limitations. I feel that we should determine if it is necessary to use same of the bond money for road repairs prior to releasing the bond. JH/sdt Attachment DENTION/TXTST530 erts v MtLrch 0.) CITY OF EDMONDS 250 51h AVE. N. - EDMONDS. WASHINGTON 98020 * (206) 771-3202 COMMUNITY SERVICES February 25, 1987 Jim Smith Olympic Properties, Inc. 620 Edmonds Way Edmonds, WA. 98020 SUBJECT: SHORT PLAT IN SHELL VALLEY Dear Jim: LARRY S. NAUGHTEN MAYOR PETER E. HAHN DIRECTOR I am writing in response to your request for a list of conditions required in order to proceed with the subject development. In order to do this, it is necessary to list the problems with the existing systems and the events leading up to the present. 1) The existing system is too small. 2) The work was buried without an inspection. 3) An observation pit had to be dug in the new asphalt. 4) Large gaps exist at the pipe joints. 5) Difficulty trying to resolve the problem with your contractor. We are willing to issue the second building permit based on the following conditions: 1) The existing joints shall be sealed and inspected to our satisfaction. 2) The observation pit shall be filled with crushed rock, compacted to City standards and paved with 3" of ACP. 3) The drainage deficiencies shall be addressed with an on -site system on lot 3 prior to issuing the remaining building permit. In a separate matter, it is necessary to ifint out that this is not a final punch list for the subject plat. Other items, such as the failure of the road, will need to be repaired to City standards even though they may not be addressed herein. PUBLIC WORKS PLANNING PARKS AND RECREATION FNrINFFRINr. Jim Smith February 25, 1987 Page 2 Hopefully, we can work together to complete your short plat as quickly as possible. Very truly yours, JERRY W. HAUTH, P.E. Hydraulics Engineer JWH/sdt JIMSMITH/TXTST530 *I I ) . 9.) M-- "J 1 IzelIS' 7 CITY OF EDIVIONOS 250 5th AVE. N. - EDMONDS, WASHINGTON 98020 - (206) 771-3202 COMMUNITY SERVICES January 28, 1987 Tom Bel t B & M Contractors P. 0. Box 216 Lynnwood, WA. 98036 SUBJECT: SMITH SHORT PLAT Dear Mr. Belt: LARRY S. NAUGHTEN MAYOR PETER E. HAHN DIRECTOR With respect to the subject project, it appears necessary to clarify a few things. First, I concur with your interpretation of the standard specifications. It very clearly states that, if required in the plans, a storm sewer can be tested by exfiltration. You will recall, that storm sewer was installed and backfilled without an engineer from the City inspecting it. In addition, there was some question about the size of pipe installed. The receipts that you gave us show 36" diameter pipe and the approved plan shows 42" diameter (73% of the required volume). We attempted the exfiltration test not to "test" the pipe, but to establish the amount of capacity available in the buried pipe. We tried to fill the pipe from a nearby fire hydrant. The meter on the hydrant indicated that we had put sufficient water in the pipe to fill it, and yet there was no visible indication that the pipe was filling with water. At that time, it was agreed that I would make a visual inspection of the pipe from the inside after your crew removed the end section. Upon entering the pipe, I found the ends of the pipes to have up to 2" of gap between them. This certainly explains why the system failed to hold water. This information was relayed to one of your crew. At a later date, we found your crew trying to seal the gaps with "rubberized acrylic caulk." A subsequent exfiltration test indicated the pipe still fails to hold water. Since it was the intent of this pipe to hold water, and since it fails to hold water, the pipe does not serve its function and is unacceptable as constructed. PUBLIC WORKS 0 PLANNING 0 PARKS AND RECREATION a ENGINEERING I Tom Bel t January 28, 1987 Page 2 I previously offered to work with the developer in an attempt to come up with a way to compensate for the 27% + deficiency in detention volume. This offer still stands. However, as this system currently exists with the introduction of a large volume of water under the road, the system is not in accordance with generally accepted engineering practices. If you have any other questions on this matter, contact me at your convenience. Very truly y urs, W JERRY W. HAUTH, P.E. Hydraulics Engineer JWH/sdt cc: Jim Smith Bob Jones SMITH/TXTST530 0) INVnlr-,= SASCADE CULVERT CORP. 4APO cat P.O. BOX 217, ARLINGTON, WASHINGTON 98223-0217 TELEPHONE (206) 435-2181 SEATTLE/BELLEVUE 625-0554 SOUTHERN CALIFORNIA (619) 741-8737 F S 0 M CONTRACTORS L P 0 183OX 216 0 D WOOD LYNNWOOD WA 98036 1 T 0 'A' COMPLETE 0 M I * , , CAL ±� ` —LL OBE 32 0 �4-`..-TWLSGR IPTION- --------- -- U,M LAT ATTN/ E� F, NOTE CENT nF' TOT�W,`GADEk I L L "'CALL AN6 `QEL'Ay' OF#��bkf)18R: A Al I L NOTE V II7;o -:CUSTOMEIi-'WlLI:CALT MATERIAL'BETWEEN 9 ANQ .10 :' . 00 A.Mp .00 A-M. F 'RIDAY 6/6/ 'f" _0 T J. . 4TFIADE�b�is6otjtu� T� � , � 43*85 MAIL PAYMENT TO: CASCADE CULVERT P,O, BOX 217 ARLINGTON, WASHINGTON 9822 PAGE 2 D.U.N.S. 04-067-9904 - liyv. F 6/0�6/86�6�/10/�86 �726 S H M CONTR­A­C--T0-R—S----'— I JAMES SMITH SHORT PLAT P EDMONDSp WASHINGTON T 0 112 OF I 7e2l �-ODAY NET lt443.,85 2 - DUPLICATE INVOICE — — — — — — — — — - - --- - - - - - - - - - - - - - ----- - INVOICE CASCADE CULVERT CORP. P.O. BOX 217, ARLINGTON, WASHINGTON 98223-0217 um TELEPHONE (206) 435-2181 SEATTLE/BELLEVUE 625-0554 SOUTHERN CALIFORNIA (619) 741-8737 S B Z M CONTRACTORS 0 L P 0 BOX 216 D LYNNwOOO WA 98036 T COMPLETE 0 m. MAIL PAYMENi CASCADE CULVERT P.O. BOX 217 ARLINGTON, WASHINGTON 98223-021 PAGE 1 D.U.N.S. 04-067-9904 S 8 & M CONTRACTORS H I JAMES SMITH SHORT PLAT P EDMONOSq WASHINGTON T 0 MEW- 1E R', SHIP VIA ORDER NUMBER SIS. NO. RMS 5200 WILL CALL V/ TOM BELT 31 112 OF 1% ZODAY NET 3, IUMBER,' d I DESCRIPTION. U/M TOTAL. FEET UNITIPRIC9"�,'.:: I ou 135920 16GA 08INX2- 0-F T* , A��.'.,SP I RAL PIPE EA 3 60 2e95 177000 3 716GA 0 8 X 077.147 �"AL ZF. P t&A NO .- EA- s, 000 *00 3/8INX07.I'NX'Q8TN DIA NEIO GASKET 'E A �'Z'l 000 600 301 14GA 361NX20FT�—GO ..REC, TRI PIPE 'EA 2 eq*so 779*60 302 14GA 361N.X17FT GO, -A EC TRI..PIPE EA 3 31 `3 3 331*33 303 16GA 36 1 Nx 0 FT GO C" TRI PIPE EAi .*,92 155o92 304 16GA 36 INX 1 Q.5 1 N GlY.014P IPC,i liA� 3. "'60 000 305 ? T R I B'ANDS'�' 3 8 1 N X 1 -2 r N X 3-6 1 N,' OV EA A,, 3� y 17 '00 *00 AS K E,,f E 3 -"W 00, *00 W6 12GA 36. TN 'M, NO B, E C"A P. W/, S.T U s E: A, '0; *00 307 '�E k, -N '2 '00 00 F Q..6�"*O-NG ON�� WA-SHI-NGT- -()N STATE. TAX.-,CODE)e RE:SALE INOTE CALL"' W�HEN R EADY J.'" A-M E S S M I T CON TAAtT/' H T f 4V Nr E 0 NE, A, Es.AM6u'NT,,, TRAPE�PISCOU ,EOUS,,CHA'RG "'MISCFILAN E,.:i 2 — DUPLICATE INVOICE ------------------------------------------- 0) TOM BELT 0 P 0 BOX 216 LYNNWOOD WA 98036 City of Edmonds 250 - 5th Ave. N. Edmonds, Wa. 98020 AttN; Jerry Hauf Engineering Dept. Dear Sir: RECEIVED JAN 19, 198'1 ENGINEERING 1-16-87 Ref: Storm- Jim Smith Short Plat - Shell Valley Lovell-Sauerland Plan 85-1430 We believe we have installed the retention on Mr. Smith's short plat to meet the necessary requirements. You have physically inspected the inside of the pipe, the bands and the grade, and to our knowledge you have found no problem. 778-0247 Regarding your requirement to have the pipe water tested, I believe, in reading to me the requirements for testing storm., that you are assuming that all storm is tested. The fact is that most all storm installed in all of our surrounding areas, including Snohomish and King Counties, is not required to be tested, so plans do not call for pipes to be constructed of material to be tested. In the plan for Mr. Smith, which was designed by Lovell-Sauerland and approved by the City, item 7 in the general notes calls for galvanized or aluminum pipe, which is a material that is not designed nor built to be pressure tested in any form. Refer to the enclosed letter from the Marketing Manager for Cascade Culvert Corp. who manufacture and distribute metal pipe in the 3 Western States and Alaska. Also refer to the insert which refers to testing of storm drains constructed of premiable materials, which the aluminum pipe is not. Mr. Smith has posted a cash performance bond, so I see no need to withold the building permits on these lots. Your written reply will be appreciated. Yours truly, 16,,,Ys a L/C Tan Belt B & M Contractors Encl. 2 cc Bob Alberts, Engineer, City of Edmonds Hal Reeves, Building official James Smith, owner Jerry Lovell, Lovell-Sauerland 776-2829 CASCADE CULVERT CORP. P.O. BOX 217, ARLINGTON, WASHINGTON 98223-0217 TELEPHONE 206-435.2181 TELEX: 15-2461 November 24, 1986 B & M Contractors P.O. Box 216 Lynnwood, WA 98036 Attn: Mr. Tom Belt Ref: James Smith Short Plat Dear Tom: This letter is to confirm our conversation of November 21, 1986 regarding the'above-referenced job. Cascade Culvert had no knowledge that the Pipe Supplied was to be water tested. Corrugated metal Pipe typically will not pass any form of pressure test at the joint or the helical lockseam. It has been our experience that when tested storm sewer is required, it will be specified on the engineer's plans. Any questions regarding this or future storm sewer applications, please don't hesitate to call. Sincerely, V-k Robert Showalter Marketing Manager RS:mm "�__�'CASCADE CULVERT CORP. P.O. BOX 217, ARLINGTON, WASHINGTON 98223-0217 TELEPHONE 206-435-2181 TELEX: 15-2461 November 5, 1986 B & M Contractors P.O. Box 216 Lynnwood, WA 98036 Dear Customer: Cascade Culvert is now entering its 22nd year. We were originally established in May 1965. In February 1983 we were acquired by an Australian firm known as The Bell Group, Ltd. Anticipating the need to widen our market area in late 1984, we added another manufacturing plant in Escondido, California. We now operate as a full range Culvert company throughout Alaska, Washington, Oregon and California. Looking into the future, we are dedicating ourselves to meeting the total needs within our industry. While we know progress has Fe —en made over the past 21 years, we recognize there are areas for improvement. In an effort to monitor our development towards this goal, we would appreciate your candid opinion on some critical areas. We have attached a short questionnaire, along with a self-addressed, stamped envelope. We welcome any additional comments. Thank you for your interest. Yours very truly, ) ry Robert Showalter Marketing Manager Enclosure RS:mm rA Section 62-Pipe Laying, Jointing and Testing prior to testing and shall be tested after backfill by the exfiltration method, or by the low pressure air method, unless otherwise provided in the special provisions. How- ever, where the natural groundwater table is such as to preclude a proper exfiltration test, the Engineer may re- quire infiltration tests. All work involved in cleaning and testing sewer lines between manholes and/or rodding inlets as required herein shall be completed within 15 working days after backfilling of sewer lines and structures. Any further delay will require the written consent of the Engineer. The Contractor shall furnish all labor, materials, tools and equipment necessary to make the test, clean the lines and to perform all work incidental thereto. Precau- tions shall be taken to prevent joints from drawing during tests, and any damage resulting from tests shall be repaired by the Contractor at his own expense. The manner and time of testing shall be subject to approval of the Engineer, provided that the Engineer may limit pipe footage to be laid prior to testing. All wyes, tees and stubs shall be plugged with flexible jointed caps, or acceptable alternate, securely fastened to withstand the internal test pressure. Such plugs or caps shall be readily removable, and for their removal shall provide a socket suitable for making a flexible jointed lateral connection or extension. In the event that the Contractor elects to test large diameter pipe one joint at a time, leakage allowances shall be converted from GPM per 100 feet to GPM per joint by dividing by the number of joints occurring in 100 feet. If leakage exceeds the allowable amount, corrective measures shall be taken and the line then retested to the satisfaction of the engineer.. Testing of storm drains shall be the same as for sanitary sewers. -3.10A Exfiltration Test Prior to making exfiltration leakage tests, the Contrac- tor may fill the pipe with clear water to permit normal absorption into the pipe walls provided, however, that after so filling the pipe he shall complete the leakage test within 24 hours after filling. When under test, the leak- age allowable shall be limited according to the provisions that follow. Specified allowances assume pre -wetted pipe, Leakage shall be no more than five -tenths (0.5) gallon per hour per inch of diameter per one hundred (100) feet of sewer pipe, with a minimum test pressure of six (6) feet of water column above the crown at the upper end of the pipe or above the active ground water table, whichever is higher as determined by the Engi- neer. The length of pipe tested shall be limited so that the pressure on the invert of the lower end of the section tested shall not exceed sixteen (16) feet of water col- umn, and in no case shall be greater than 700 feet or the distance between manholes when greater than 700 feet. For each increase in pressure of two (2) feet above a basic six (6) feet measured above the crown at the lower end of the test station, the allowable leakage shall be increased by 10 percent, tabulated in the table which fol- lows. ALLOWABLE LEAKAGE IN GALS. / 100 LINEAR FEET / HR. Head Above Crown on Lower End of Test Station Pipe Size (Inches) 6 Ft. 8 Ft. 10 Ft. 12 Ft. 14 Ft. 16 Ft, 4 2.0 2.2 2.4 2.6 2.8 3.0 6 3.0 3.3 3.6 3.9 4.2 4.5 8 4.0 4.4 4.8 5.2 5.6 6.0 10 5.0 5:5 6.0 6.5 7.0 7.5 12 6.0 6.6 7.2 7.8 8.4 9.0 15 7.5 8.2 9.0 9.8 10.5 11.2 18 9.0 9.9 10.8 11.7 12.6 13.5 21 10.5 11.6 12.6 13.6 14.7 15.8 24 12.0 13.2 14.4 15.6 16.8 18.0 27 13.5 14.9 16.2 17.6 18.9 20.2 30 15.0 16.5 18.0 19.5 21.0 22.5 36 18.0 19.8 21.6 23.4 25.2 27.0 42 21.0 23.1 25.2 27.3 29.4 31.5 48 24.0 26.4 28.8 31.2 33.6 36.0 54 27.0 29.7 32.4 35.1 37.8 40.5 60 30.0 33.0 36.0 39.0 42.0 45.0 72 36.0 39.6 43.2 46.8 50.4 54.0 In any case where the measured leakage is excee�deid but is not more than one hundred and forty perc . ent (140%) of the allowable leakage, the Contractor will be permitted, at his option and at his own expense, to r - e.p6 , ir the defective section without removing and rel5yibg the pipe. Such repairs shall satisfactorily comply with re- quirements of the leakage test. In event the measured leakage should be more than one hundred forty percent (140%) of the allowable, the Contractor, at his own expense, shall remove and discard all defective pipe and relay new pipe to conform with the requirements of the leakage test. The Contractor shall furnish all equipment, materials and labor necessary for making the leakage tests. Any arrangement of test equipment which will provide accu- rate means of measurement will be approved by the Engineer. The leakage test will be made by the Contrac- tor in the presence of the Engineer. -3.10B Infiltration Test When the natural ground water table is above the crown of the higher end of the test section, the maximum allowable limit for infiltration shall be four tenths (0.4) gallon per hour per inch of internal diameter per 100 feet of length, with no allowance for external hydrostatic head. -3.10C Other Test Allowances All lateral or side sewer branches included in the test section shall be taken into account in computing allowable leakage. An allowance of 0.2 GPH per foot of head above invert shall be made for each manhole included in a't�est section or tested separately. -3.10D Air Pressure Test f6i Se*ers and Storm Drains Constructed of Air-41remeable Materials 1. Pipelines may be tested with low pressure air in lieu of water exfiltration, by either the constant pressure method or the pressure drop method. Con- stant pressure shall be 3 psig greater than the average back pressure of groundwater above the centerline of the pipe, and pressure drop shall be from 31/2 to 21/2 psig greater than the average back pressure of groundwater above the center of the pipe. At the contractor's option, pipe may be tested without pre-wettirig; however, test allowances fol- lowing assume pre -wetted pipe. 2. The rate of air loss shall not exceed 0.003 CFM per sq. ft. of interior pipe surface, except that when the computed rate for a test section is less than 2 CFM, the allowable rate shall be 2 CFM. In the event that the contractor should elect to test air - permeable pipe without pre -wetting, during dry pipe and/or dry ground conditions, alternate air loss allowances may be substituted as may be approved by the engineer, provided it can be derd6nstrahed that the alternate criteria correlates with the stand- ard criteria for wetted pipe. 3. The test equipment to be used with either method of air testing shall be furnished by the contractor and shall be inspected and approved by the engineer prior to use. The inspector may at any time re- quire a calibration test of gauges or other instru- mentation that is incorporated in the test equipment. 4. SAFETY PROVISIONS. Plugs used to close the sewer pipe for the air test must be securely braced to prevent the unintentional release of a plug which can become a high velocity projectile. Gauges, air piping manifolds and valves shall be located at the top of the ground. No one shall be permitted to en- ter a manhole where a plugged pipe is under pres- sure. Four pounds (gauge) air pressure develops a force against the plug in a 12-inch diameter pipe of approximately 450 lbs. Air testing apparatus shall be equipped with a pressure release device such as a rupture disk or a pressure relief valve designed to relieve pressure in the pipe under test at 6 p.s.i. 5. Recommended procedure for Conducting Acceptance Test by the Constant Pressure Method. a. Plug all pipe outlets with suitable test plugs. Brace each plug securely. b. All gauge pressures in the test should be in- creased by the amount of groundwater pressure at the center of the pipe. Page III-11 4;r- i5 4c,- 1514a-� in (J* <:c�ncii.kc� n .:ir"v,,� ;;��rn +Fe, +�nnr-- tn-�5 - iza = <��, &�147 --�- c> .-z-7= - 4f c- =r z::, - (C-, FZ4-L,r-,r -e�'X 17 S) -�- 6� - Z7Y 0. 20) <',' = o -,:�p 4:::�, = e:> - Zia 10 ---y . j - w 1. xxx &n 0 in coo &M !a C4 C4 V A A C4 C4 C4 _7) -7:5 )(j�o) + Amj E: >4 - (:�:-) -ay A VIJ �0.95) 4- 4r-> - -2:7- C: p .,z -,, ezO (O.'ag) i:5� (- CL- 8 67 4-2" ---MP C,-, E5, -e I m p A --51 - TIC fA #A 0 x x in W 4A ace inco C4 C4 -0 ot -0 C4 C4 C4 C4 C4 C4 Ir �Z4LA-CA,v = a E7x(2-) - Q ay AL4.OvV = — c:;,. r > 1-4&...44 = sa�5 / %3 DATE: - 2-1 - 7 01) 14E"'TO TO: Building Division Community Development Department FROM; Engineering Division Public Works Department SUBJECT: 2-1 ((--)n \ILI I E=-:� p-�r�� After review of the subject building permit application, we have the following comments: Now 05� x E-40 10--7-05"T A 5 R T--- C -13-V Air-1--ce CAyIJ7-- I # �boz - - !�)-12 1 —Ilc:p . PUBLIC WORKS I)EPARDEMCKLIST BUILDRC PERMIT REVIEW Q-A03_-:E61A"' Pr&d- (address) I (date) 0 Street Right -of -Way Existin&____fd* J Z H I Access Easements Exist' c4 Utility Easement Exist' W Lot Per SubdivisionS Plat L56-,- Assessor Map_ Site Plan Checked for Accura .0 Z Underground 14iring Reqd. 4j= 4ew�� .4=. 0 Check Accuracy of Iegal Description Z Review by Date Existing Water Main Size 0, Water Main Required Service Line Required Hydrant Size Existing c4 Hydrant Reqd Per Fire Code Size Detector Check YEter Reqd. Cross Connection Inspection Fire Department Conuents Water Meter AV, Review by te F—IK— 714" Septic Tank Design Approved Date Aa Septic Tank Permit Reqd. Perrmr m3t No. AA0 Sanitary Sewer Availability Pro, J. Drawing No. S-Ror File No.---Ej& P-7r Side Sewer Availability. A6&9V!_e Sanitary Sewer Connection Fee Reqd.. A20 0- :3 Review by A-8p,10 Date =A Open Ditch Existing kZ,,Z Reqd. Culvert Reqd. At - &�" X04"_ 'row-,& Size Catch Basin Reqd. "oe.10 &Aae Indicate an Site Plan 0 Shoulder drainage maintain collection on swale open runoff Yunhole reqd. &4ke, Indicate on' Site Plan Soil Conditions and Ground Water Field Checked Review by. Date Revised: MO-1977 W; Page 2 M Street Paving Reqd. Curb and Gutter Reqd. Sidewalk Reqd. Curb Cut'for Driveway Reqd�7 Z r4 Right -of -Way Construction Permit Reqd. Bond Reqd. for Public,.Inproven-ents A Street Nan-e Sign Reqd. Other Signing Reqd. AVIV * Pre Permit Site Inspection Tnade on z 0 �-4 BY: S31JER WATER z STREET H ENG=RING Special Requirenmts listed in memo to Com=ity Developn-ent Deparment, 44 Building Division 0 C4 P4 P4 -4 BY Date All items filled in on Building Perrnit Application BY Date Drawings Stamped and Notations Made BY Date by Public Works Departumt Revised: lv 10-1977 TRAFFIC WATER SEWED sTREETS PLANNING W X z W r W >- W I Ld Z CZ C3 in L tn IL Ir Z to w I.- CL a d z W in UA 0 z UJ U 0 Of Z W in p,_ W t3 > I- a X M M 0 -4 Me = _J Er . in a. to ca In W "'I C3 C3 M 0 0 CL Z Z I I I 'J 'J 1 1% vy 1 '4 % F\ APPROXIMATE ONLY AND IT SHALL BE THE RESPONSIBILITY 0 F THE /0 EX. A/H CONTRACTOR TO DETERMINE THE EXACT LOCATION(S) OF ALL UTIL- 11 EX. M-4 (L--RoP \/H) ITIES AND IMPROVEMENTS TO AVOID DAMAGE OR DISTURBANCE. I L INV 299.00- N 0 INJV 31B.00--- 710 EROSION F_ILTEF?, B,,ARRIER INV 312-00-S 2 ALL CONSTRUCTION SHALL CONFORM TOTHE "STANDARD SPECIFICA- T TIONS FOR MUNICIPAL PUBLIC WORKS CONSTRUCTION" AND STANDARD RIP RAP APPROX. LOC. EX. 0>FZAINAGE COURSE PLANS AS ADOPTED BY THE CITY OF EDMONDS, AND ANY REQUIRE - EX. -TEE -A -A MENTSS ESTABLISHED AT CI1Y HEARINGS ON THIS PLAT. EX. TEE 7Z� E X. 8 CONC. 5.3. EX. 6"CONIC. SANITARY SEWEf;,- 1\44IN C ........ EX TEE T M ...... 3. ALL CONSTRUCTION IS SUBJECT TO- THE INSPECTION BY THE CITY S= 0.0855 NMI 5= C)- 1 112 3\0 0 kvc' 4. - - - -- - - - - - -- - - - �Q __ ... _- OF EDMONDS AND THE CONTRACTOR SHALL NOTIFY THE CITY OF HIS ,.,_�,o C, 1b 6-0 -W 6�T 0'RA(NAGE SL/V4LE t SCHEDULE IN SUFFICIENT TIME TO PERMIT INSPECTION PRIOR* TO AND DURING THE WORK 0\ 0 0 0 1 4. ALL WORK WITHIN THE PLAT AND CITY RIGHT OF WAY SHALL BE 6-17 42 CMP SUBJECT TO THE INSPECTION OF THE ENGINEER. PVC THICkENEP EPGE lip V7- 5. THE CONTRACTOR S 11 A L L BE RESPONSIBLE FOR OBTAINING ALL -------------- PERMITS FOR ROAD AND [IT ILITYCONSTRUCTION. I Va" PVC. CL, 200 -2"Pvc, CL. 200/// J­i x, -- ------- 40 �00 STUE3 5'- E3 " F:VC ------ 6. PROVIDE AND MAINTAIN TEMPORARY SEDIMENTATION COLLECTION STUB 5'- FACILITIES TO INSURE SEDIMENT -LADEN WATER DOES NOT ENTER 94.14' _V ! 150-00 THE NATURAL DRAINAGE SYSTEM. THESE FACILITIES MUST BE IN OPERATION PRIOR TO CLEARING AND GRADING, AND SATISFACTORILY /0 h C L E AW OU T C-,/R_t> MAINTAINED UNTIL CONSTRUCTION IS COMPLETE AND THE POTENTIAL c.E3.#2 OF ON -SITE EROSIONHAS PASSED . 0 +45 -r* T 1+ 6,5 FR T UGATED METAL 16 GA. ME T,�:� SHALL BE CORR' _\TEF, 7. ALL STORM SEWER PIPE I /1 0 ID 0, o 0 -314 KA TER _ER GALVANIZED AND ASPHALT COATED TREATMENT I OR BETTER, AAE 7 0 0 "T CORRUGATED ALUMINUM PIPE, 16 GA. OR PVC. EPM (BY THE `CITY,10P 4 0 0 A SANITARY SEWER PIPE SHALL BE 611 PVC-SDR35-AST.M SPEC. D3034 Z 8. ------------ (0 e(q;,42-; I MATERIAL OR CONCRETE ASTM C-14 CLASS 3, RUBBER GASKET. r 0 C.), 9. SIDE SEWER PIPESHALL BE PLACED ON UNDISTURBED. SOIL.' NATIVE ro. 0 'FILL PROVIDED SHARP ROCKS ARE 01 MATERIAL CAN BE USED FOR BACK 4- A(/H/L E 0 KEPT OFF THE PIPE bURING THE BACKFILL PROCESS. 0 TE�MPORARY C��6EfK< c;, I SION HEAC�XWALL -34"CMR CULVi5fRT, IRIF:1RA \J (MILITY CRb5SING,�-:5 A E r-,>Vt IN F-LACF 10. ALL CONNECTIONS TO EXISTINGWATERMAINS TO BE ACCOMPLISHED BY 0�9 0 OF� CXDNS,_74F;�!UCTEC�' ACk��=_/LLED. LINE ------------- THE CITY OF EDMONDS WATER DEPARTMENT. SERVICE REQUIREMENTS TiRENC- 1,4 WITH E3 M'/ - RCASTIC, LAPPING UR5TF;i�EAM TO BE ARRANGED FOR PRIOR TO START OF CONSTRUCTION THROUGH + OECTIO -bVEF;� AL->JACEN-F p 113 WATER DEPARTMENT CUSTOMER SERVICE SECTION (TEL.: 775-2525). --�"OWKSTREAM SE /ON. 11. ROAD RESTORATION SHALL BE PER CITY OF EDMONDS STANDARDS. E10 70- 12. ALL ROOF DRAINS SHALL BE CONNECTED TO STORM DRAINAGE SYSTEM. ab 94.14 0 130.00 10'NATIVE G/R/OWTH PROTECTION" E3UFFEF,::( CREEK' NOT TO E3E E�ISTUFZ/E3EC? %T- S 4W Y---b D Zt= -5 CUTTING VIMITED TO HAN019"UTTING OLACK,/bERRIES) ----------- TOP 313-76 0 0 0 ��'00 '0 E5M'T (50' ACCE55 ANP UTILI-FIES ESM'T) 0\-/ERF'L0W- -312-39 BASEP ON ORAWING BY REIP, MIPI�)LETON ASSOC/ATE-9, INC., F-ILE NO. 02-85-69, C)ATED 6-20-85 -REMO\�ABLE C PVC 051 P U .3 z L2-PVC0RCMR INV CUT HOLESA�'PIA­. IN PVC CAP 345 340 0 0z 330 W 325 _J J W 11 0 Ld z _J z 0 EX. 4\5PH. ""�CE3,TYPE 1-A (ASSOC/ATEC�l C.O.- 16 OR EQUAL) C. E3.4' 1 R E STR I C TOF?, F�,>E TA 1 L N-T 0. E3 10 24"CINAR CULVERT 0. E;5 �/-M IK 305 OU-rF-ALL! ANV a08,29 0 0 0 �50, VC M = 0. 54 U 60 1 VC 11'p 1\4= 1.21 + 0 00 + 40'VC + N _-4 E3- M= 0. Z5 A- 0 N + U G\ (D N 0 U > 0 I U + W 0 N rob 0 (\J N lf) C-3,#2 (f) M 7'- (f) TOP 323.41 Z, -0 INV 320-41 00- 100 12!"Pvc WELP END PLATE ON�4?"CMP CMP \-WELC�l ENO) F->LATE ON W1 6 C1\4F 5TbE3 42 Cmf-, I W/ 1�>_t,cmp STU63 INV 308.89, Tvpff 1A WIREs-rRlc_ro)� _FOR �51_9-76 INV. 008.54 A4=0- 0 V`1 M=0.46 U) 0 + N U 0 q 0 Lf) Y) 1�1 M + CQ 0 00 0 ly (D + (n 9 -7 4, r 7-7­ t 2"M/N. COMPT PERTH, CLASS "B" ASPHALTIC CONC. -I­HICKENEI;� ECIGE ASPHALT,;, I 'Az" MIN. COMPT. 01EPTH, CRUSHEP SUIRFACIt,1G, TOP C0LJRSE �/2 " r\.4 I N - C01\A F, T. PEFTt i, C/;�U_5HEF_-' OufRFACING, &ASE CGUF,-SE_ \--GP-AVEL- E3A5E, CLA,5S"0", rVIA-1 BE IREO'[?, F�ENE:;,iN(3 SOIL CC)NOITION TYPICAL ROAPWAY 6ECTION N.TO. J� P>VC CAR C.. 17r r_ L4AW ST. WaLi'41_17 ST REQ'C).' LENGTH PIRE---�__ �et. VIC StakeS.. z ix.cavate a 4"x4" trert�h upslope along the line of staNes I Io .41 .3. taplE filter [,;a t e r I a I to 4. Eachfill and compact the takes �rid E!xtt:_-nJ it i it to e,cavated soil. Filter Barrier: ThiS, sediment-i-barrier liay be coriStrucLed using burlap the tr,:nch. or standard 'strength synthetic if ilter fabric. It 1. is design I eq for- I I pw 'aie*'ilp. or: modet ws not, exceeding 'fs. SQ,,� P140 I.Q 1. The hei ;ht of a filter bar Irier siall be a.miriimum of 15 inchei, and 11b ;,:Y�IY shall ndt exceed inche4 2. Burlap Or standard strengtb syntnetIc filtertfabric sh.all be pLil-chased in a co6tinuous rol I and cftt to the+ length of, the barrier to dvbid N, the use�of joints, (and thu� inpr)ve the strer�gth and afficiency3 of the bar ier). 3. The sta�es shall �be space& a maxim-im of 3 fe4t apart at the barrier 1 ocatiorl and driven securely int.) t6e ground �(minimum iof 8 inches WNSI,-�LJCT 10;, of' A I IL UR b�'IiRILR 4? A tr�nqjj. §h4ll ho e�poy�qd 4ppr�)xjtately 4 inches wide and 4 ipche5 deep along tIIe lffle of stok,Vs,arij u'p'166e �rdm 'the b a Hir 1 e r.' Maintenance The fil;�er materila ]shall e Stapled to the qooden stak es, and f3 inchestlf the fabric shal It be ex'.onded into the trench. Heavy Puty 1. Silt fences arid filter bartlers shall be inspected immediately after wire s pies at Teast 1/2-inch long46hall be �used. FiAter material each rainfall and' at leasCdaily during prolonged rainfall. Any shall n t be stap.led to ex�stinq tr�es. required repairs shall be made immediately. 6. The tre"chshall be backf6led aed the soil dompacted over the filter 2. Should tbe fabric:'on a slit fence oil. filter barrier detompose or materia become ineffective prior to the end:Of the expected us ble life and the barrier Still'be neces ary the �lfabric shall be re�laced promptly. 7. If a fiJter bart-fler is to �e con�trocted aCr Ss a ditch line or, Swale, the bar ier shall be of sufficiett length toielimina end flowi 3. Sediment depositV should be removed after each storm eient. They te and the:plan conriguration; shall'rei�mble an arc or horseshoe W.1 t h must be removed 4en deposits reach 'approximately one- :alf the height the end oriented uo�lqpq. J.�Jlote 1.066) or the barrier 8 Fi arriers shal I be r�moited. h�n they h ed their us�fwl 4. AAy sedlInent depol;lt remaining In place after the $Jli feqpq or.. ]ter Ii I've 5ery purpose but not before th� vosVcpe:�area has ibeen per.-nariently s�abi- i filter liarrier isino onger requ iirel shall be'dressed to conform lized. with theex Isting., gr:de, prepared and seeded.. I > /A, ul > > ku V8 BEND .A > + < I WVV I Y/ 220th ST SVII 0 E 6­0 160 D WA-F E R­T I G i__4 _r P"L. U G VIGNIT"r KAAP SCALP: I"= Z5(�,01 CLEAN -OUT PET/!!\1L_ N T5. DRAINAGE AND UTILITY PLAN AND DETAILS FOR JAIMaES Sm"ITH IN SWV4 SW 1/4 SECTION 19, T. 27 N., R. 4 E., W.M. CITY OF EDMONDS SNOHOMISH COUNTY, WASHINGTON J M28 1986 I PEFP_ CITY COMMENTS L Lovell Sauerl and & Associatesi, I nc. S SLIRVEYORS DEVELOPMENT CONSIJLTANTS PLANNERS 23106 100TH AVE. W. EDMONDS WA. 98020 PHONE 775-1593 AWN CHECKED DATE B. SCALE FILE NO. 111=20'HO -22-86 K" RGJ 1 In =51 V Tt 85-1430 2116V 511� A/� CIO f7 .I--/ lz�7 f77