Loading...
21110 PIONEER WAY.PDF11111111111111 12833 21110 PIONEER WAY .:zr 00 CD cz� CITY of EDMONDS For Inspection Call 771-3202 Address of Construction: S 10 E ST FILE S E-W E R PERMIT PERMIT NO. EDMONDS Property Legal Descripti'on (Include all easements): X, Owner and/or Builder: /2e- Js ttr,"w _S X,4� 'Zt�' to C -'74' Contractor & License No: 4.:-- Single Family Residence Multi -Family (No. of Units Commercial (No. of fixture Units Invasion into City Right -of -Way: No '-A/ Yes (If Yes, Right -of -Way Construction Permit required. Call One -Call -Center (1-80,0-424-5555) before any excavation.) Cross'other Private Property: No . Yes (If Yes, easement required, attach legal description and county easement number.) PLEASE.READ THE ITEMS LISTED ON THE BACK I cer4tify that 1-have read and shall comply Nate with the items listed on the back. Permit Fee: issued By: /V" Trunk Charge: Date -Issued: Assessment Fee: Receipt No.: Partial. Inspection: Comments Final Inspection Approved: Rejected: eason SP. B!J Date Initial HOLLAND Date Initial PERMIT MUST B.E POSTED ON JOB SITE Wh.ite Copy File Green Copy - Inspector Date —5—itial Buff Copy - Applicant The City of Edmonds Side Sewer Drawing EASEMENT NO - -------------------------------------------- NEW CONSTRUCTION REPAIRS Fj LID NO - ------------------ ASMT. NO - ------------------ OWNER ..... -------- -E -- �� r\cx- -------------- PERMIT NO. .76�25 CONTRACTOR EDMONDS R Re ,:AT� JOB ADDRESS D L--.Lcv� ------ Coti�i� ----- Cn --- -------- LEGAL DESCRIPTION: LOT NO - ----- 4 ---------------------------- BLOCK NO.. [T- FATMENT-PLANT ..................................... ........................ ---------------------------------------------------------------------------------------- � NQRT-t-� am— PWW-0001-11175 (REV.11/78) .D ------ E!& ----------------- ...................... S.5'DP. 4�'c.c-wi3s C.O. c%P 1. S 1 0 P. r I op. X�om.$T TO G"COMC - VAul-T Approved: 33,j DATEByj ........................................... ft STREET MLE FILE# N/A DETERMINATION OF NONSIGNIFICANCE STREET Description of proposal Deck Addition Proponent Harry Fass Location of proposal, including street address, if any 21110 Pioneer Way, Edmonds, WA 98026 Lead Agency Edmonds'Planning Division The lead agency for this proposal has determined that it does not have a probable significant adverse impact on the environment. An environmental impact statement (EIS) is not required under RCW 43.21C.030(2)(c). This decision was made after review of a completed environmental checklist and other information on file with the lead agency. This information is available to the public on request. X There is no comment period for this DNS. This DNS is issued under 197-11-340(2); the lead agency will not act on this proposal for 15 days from the date below. Comments must be submitted by Responsible Official John Bissell Position/Title Code Enforcement Tech. Phone 771-3202 Address 250 5th Ave. N., Edmonds WA 98020 Date April 19, 1991 Signaturl ' - IL X You may appeal this determination of nonsignificance to- Hearing Examiner at 250 5th Ave. North, Edmonds, WA 98020 no later than 5:00 p.m. April 29, 1991 by filing a written appeal citing reasons. You should be prepared to make specific factual objections. Contact John Bissell to read or ask about the procedures for SEPA appeals. There is no agency appeal. FILE Compl:ete this checklist for nonproject proposals, even though questions may be answered "does not apply". IN ADDITION, complete the SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS (part D). For nonproject actions'. the references in the checklist to the words "project," "applicant," and "property or site n should be read as "proposal," "proposer," and "affected geographic area." respectively. 4 — �, —*. 0. V A. BACKGROUND 1. Name of proposed project, if applicable: 2. Name of applicant: APR PERMIT Co p -TE.,l In 3. Address and phone number of applicant and contact person: ;�r-7 (.J J J -7 4. Date checklist prepared: 5. Agency requesting checklist: ,,'I / --I I " 1,—. 2, . , /V 0 — g, -- e�-' 6. Proposed timing or schedule (including phasing, if applicable): 7. Do , you have any plans for future additions, expansion, or further activity related to or connected with this proposal? If yes, explain. 1111d 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. A/ o �// 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. A 10. List any government approvals or permits that will be needed for your proposal, if known. C r-.ell 1/g�, " 1) - - I 0� ,j , , - - 211ve", �- .. x - - �,'. - �-, i., 11. Give brief, complete description of your proposal, including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You*do not need to repeat those answers on this page. (Lead agencies may modify this form to include additional specific information on project description.) 4 Owl, 4ZA--PX1Z- Ll r U L-1 ai- .2 elllo 12. Location of the proposal. Give sufficient information for a person to understand the precise location of your proposed project, including a street address, if any, and section, township, and range, if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. TO COMPLETED BY APPLICANT EVALUATION FOR AGENCY USE ONLY B. ENVIRONMENTAL ELEMENTS 1. Earth a. General description of the site (circle one): Flat, rolling, hilly,( -steep S -o'pes� mountainous, other I b. What is the steepest slope on the site (approximate percent slope)? *'-'-" 'A c. What general typ4s of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If you know the classification of agricultural soils, specify them and note any prime farmland. d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe. /I/ C) e. Describe the purpose, type, and approximate quantities of any filling or grading proposed. Indicate source of fill. f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe. // 0 9. About what percent of the site will be covered with impervious surfaces after project construction (for example, asphalt or buildings)? 1, � I .. i 04-0(."t I 1 0"( A/0 duce or control erosion, or other impacts to the earth, h. Proposed mxe-a-Vs-u?-/eJs-et,o' Ke--"'c��-4 if any: 2. Air a. What types of emissions to the air would result from the proposal (i.e., dust, automobile, odors, industrial wood smoke) during construction and when the project is completed? If any, generally describe and give approximate quantities if known. b. Are there any off -site sources of emissions or odor that may affect your proposal? If so, generally describe. c. Proposed measures to reduce or control emissions or other impacts to air, if any: 3. Water a. Surface: 1) Is there any surface water body on or in the immediate vicinity of the site (including year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. 2) Will the project require any work over, in or adjacent to (within 200 feet) the described waters? If yes, please describe and attach available plans. 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. /�/ �--;) � �' C. 4) Will the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quantities if known. 5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan. 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. b. Ground: 1) Will ground water be withdrawn, or will water be discharged to ground water? Give general description, purpose. and approximate quantities if known. 2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any (for example: Domestic sewage; industrial, containing the following chemicals... ; agricultural; etc.). Describe the general size of the system, the number of such systems the number of houses to be served (if applicable), or the number of animals or humans' the system(s) are expected to serve. c. Water Runoff (including storm water): 1) Describe the source of runoff (including storm water) and method of collection and disposal, if any (include quantities, if known). Where will this water flow? will this water flow into other waters? If so, describe. 2) Could waste materials enter ground or surface waters? if so, generally describe. d. Proposed measures to reduce or control surfaces ground, and runoff water impacts, if any: 4. Plants a. Check or circle types of vegetation found on the site: --deciduous tree: alder, maple, aspen. other ---,,6v-!ergreen tree: fir, cedar, pine, other ,��hrubs :Z4ra s s pasture crop or grain wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other water plants: water lily, eelgrass. milfoil. other other types of vegetation b. What kind and amount of vegetation will be removed or altered? c- List threatened or endangered species known to be on or near the site. d- Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: " , -; - j - 5. Animals a. Circle any birds and animals which have been observed on or near the site or are known to be on or near the site: birds: hawk, heron, eagle, songbirds, other: ............................ mammals: deer, bear. elk, beaver, other: fish: bass, salmon, trout, herring, shellfi;�:*;t*�;;: ... b. List any threatened or endangered species known to be on or near the site. c. Is the site part of a migration route? If so, explain. d. Proposed measures to preserve or enhance wildlife, if any: 6. Energy and Natural Resources a. What kinds of energy (electric, natural gas, oil, wood stove. solar) will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. b. Would your project affect the potential use of solar energy by adjacent properties? If so, generally describe. C. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: 7. Environmental Health a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so, describe. 1) Describe special emergency services that might be required. 2) Proposed measures to reduce or control environmental health hazards, if any: b. Noise 1) What types of noise exist in the area which may affect your project (for example: traffic, equipment, operation, other)? 2) What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis (for example: traffic, construction, operation, other)? Indicate what hours noise would come from the site. 3) Proposed measures to reduce or control noise impacts, if any: 8. Land and Shoreline Use a. What is the current use of the site and adjacent properties? Il A.. - 0_��l b. Has the site been used for agriculture? If so, describe. c. Describe any structures on the site. 4/ �,. --,,.,I -c d. Will any structures be demolished? If so, what? e. What is the current comprehensive plan designation of the site? h. Has any part of the site been classified as an fienvironmentally sensitive" area? If so. specify. i. Approximately how many people would reside or work in the completed project? j. Approximately how many people would the completed project displace? k. Proposed measures to avoid or reduce displacelent impacts, if any: I. Proposed measures to ensure the proposal i patible with -existing and projected land uses and plans, if any: 14--N 41 id 7,v 9. Housing U-� a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low-income housing. b. Approximately how many units, if any, would be eliminated? Indicate whether high, middle, or low-income housing. C. Proposed measures to reduce or control housing impacts, if any: 10'.. Aesthetics a. What is the tallest height of any proposed structure(s), not including antennas; what is the principal exterior building material(s) proposed? b. What views in the immedia te vicinity would be altered or obstructed? c. Proposed measures to reduce or control aesthetic impacts, if any: 4 ct 11. Light and Glare a. What type of light or glare will the proposal produce? What time of day would it mainly occur? b. Could light or glare from the finished project be a safety hazard or interfere with views? c. What existing Off -site sources -of light or glare may affect your proposal? d. Proposed measures to reduce or control light and glare impacts, if any: 12. Recreation a. What designated and informal recreational Opportunities are in the immediate vicinity? b. Would the proposed Project displace any existing recreational uses? if so, describe. c- Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any: 13. Historic and Cultural Preservation a. Are there any places or objects listed on. or proposed for, national, state, or local preservation registers known to be on or next to the site? If so, generally describe. lu'fo b. Generally describe any landmarks or evidence of historic, archaeological, scientific, or cultural importance known to be on or next to the site. C.. Proposed measures to reduce or control impacts, if any: 14. Transportation a. Identify public streets and highways serving the site, and describe proposed access to the existing street system. Show on site plans, i any, b. Is site currently served by public transit? If not, what is the app distance to the nearest transit stop? roximate C. How many parking spaces would the completed project have? How man would the project eliminate? y d. Will the proposal require any new roads or streets, or improvements to existing roads or streets, not including driveways? If so, generally describe (indicate whether public or private). /;�ro e. Will the project use (or occur in the immediate vicinity of) water, rail, or air transportation? If so, generally describe. f. Now many vehicular trips per day would be generated by the completed project? If known, indicate when peak volumes would occur. g. Proposed measures to reduce or control transportation impacts, if any: CZ ;;e 15. Public Services 7-i" a. Would the project result in an increased need for public services (for example: fire protection, police protection, health care, schools, other)? If so, generally describe. b. Proposed measures to reduce or control direct impacts on public services, if any. 16. Utilities c a.—C' 1 ti.1 i ties. currently--ava i labl e -at �the_s )ite: ' u cft t cre use service., t t,,,ry. se�y c 0 er. t I Sys te� f _�honeJ'i�ni a se s m 0 �s e6 b. Describe the utilities that are proposed for the project. the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. r I C. SIGNATURE The above answers are.true and complete to the best of my knowledge. I understand that the lea o�n the t k 'ts decision. d agency is _�,tn o ma e i / relying Signature: ..... ..................... Date Submitted: ..... ................... D. Supplemental Sheet for Nonp oje ct "Acti ns (Rezones, Code Changes, Annexations, etc'.) Do not use this sheet for project actions. Because these questions are very general, it may be helpful to read them in conjunction with the -list of the elements of the environment. When answering these questions, be aware of the extent the proposal, or the types of activities likely to result from the proposal, would.affect the item at a greater intensity or at a faster rate than if the proposal were not implemented. Respond briefly and in gen&al terms. L How would the proposal be likely to increase discharge to water; emissions to air; production, storage, or release of toxic or hazardous substances; or production of noise? Proposed measures to avoid or reduce such increases are: 2. How would the proposal be likely to affect plants, animals, fish, or marine life? Proposed measures to protect or conserve plants, animals, fish, or marine life are: 3. Now would the proposal be likely to deplete energy or natural resources? Proposed measures to protect or conserve energy and natural resources are: 4. How would the proposal be likely to use or affect environmentally sensitive areas or areas designated (or eligible or under study) for governmental protection; such as parks, wilderness, wild and scenic rivers, threatened or endangered species habitat, historic or cultural sites, wetlands, floodplains, or prime farmlands? Proposed measures to protect such resources or to avoid or reduce impacts are: 5. How would -the proposal be likely to affect land and shoreline use, including whether it would allow or encourage land or shoreline uses incompatible with existing plans? Proposed measures to avoid or reduce shoreline and land use impacts are: 6. How would the proposal be likely to increase demands on transportation or public services and utilities? Proposed measures to reduce or respond to such demand(s) are: 7. Identify, if possible, whether the proposal may conflict with local, state, or federal laws or requirements for the protection of the environment. ENVCHK3/PFORMS CITY OF EDMONDS SSET INFORMATION SHEET FILEA STREI: 12�NEW ASSET NO. ADDITION ADDITION TO ASSET NO. RETIREMENT DESCRIPTION SERIAL NO. LOCATION D E�VR N 0 PURCHASE ORDER NO. PURCHASE ORDER DATE COST kyp) B.A.R.S. ACCOUNT NO. ESTIMATED LIFE PROJECT NUMBER PROJECT COMPLETION DATE COST /eq INITIATED BY DATE APPROVED BY "SUBMIT ASSET INFORMATION SHEET WITH FINAL PAYMENT REQUEST *SUBMIT ASSET INFORMATION SHEET UPON CLOSE OF PROJECT ACCOUNTING ONLY )ZDEPRECIATE MONTHLY DEPRECIATION AMOUNT ANNUAL DEPRECIATION AMOUNT G.L. ENTRY REFERENCE INITIAL DATE VERIFIED BY PROCESSED BATCH NO. DEPARTMENT FILE T 0. C e -o 0 "0 z rn -top CP co OA c —13 —0 r > G) 0 rn ;.2f m C 6 I"V" r m W, m Pee,n.c -0,C CL, Cc -7 71. . ... . ..... Poi I f�c,oi i r',-:-- t ;� -T 3 4 1- - - - �') 1 - I All (i :11 -i' 13 C;"e C.- A. p t I I Air. APR 10 MI :).��PERMIT COUNTER 3 07 Al v 174 < cr- Uj uu M U- Cc b ;m I-- C) LU LLJ N PRWBCT REVILM*CIMCKLIST" D gla5pmj�T ADDRESS: 211m). oommuas, PLANNING Reviewed by: (initial/date), wrwsw I STREET mamG FIRE -fU—ILDrNG sn4mz,FA,MILY/KILTIPLE/CU4�OCIAL -(Ci.rd.le One)' S41SACKS CH.ECKED. Plann ing IANCE/SETMCK- AW.1 'i�iONAL'bSi"P­E'RMIT 777777777 -77 2 77T11T. 7TF777T77777T7777 77TF1777 REMEM 'CHSCM 1 ;�ZCNING REQUIREMEN"M. 4 777777 7 7 7 777 T/ RONMEMAL.FEATURES PE VEHICLE ACCESS -77777T77T fill// 6 111711117 7T/777-77' PLAN '(On s 7 ILE 777777 111111171 77TT1777T7777777-7 .8 �7 .,DESCRIWICN VERIFICATIM DEDICATIMS 77 777777 7777TT177 77TTrR7 10 77/777/77 PUBLIC/ PRIVATE 7777771, SiWEi.-CaOTECTIM IF NO LID# 12 —777-7/7 117111111 7 rVISICN-'-REQUIREMEMS 13 F-WAY CONSTRUCTION PM= REQD UZ-0 14 777777 ////////T R7771777 777777/7 R EoD*,FoR'pumic:'n4PRovu4Ems LS,iC0NDITICNS,,&,GR0UND. M/44/ 4iEb CHECKEDA 1111111Y 16 T/777 TF1777UT 77 7 77 7 77 7 'PAVI'M 17 GVrrER r=IRED, 7TTT77 T777 7 7 7 7 7 111117TI7' 18 SIDEWALK REQUIRED Z. ////// ///////// T17TRIII ///////// Y,) 19 �7qq 777TFI TfFIT1777 77771-717 TOR DRIVEWAT REQD,'�",'r 20 -5 NANE. SIGN'-,REQW41` 21 7T/T77777 7717717 *V OTHER SIGNING: P266 �xf,!Fwk* 22 ATM� PEWER MAILABILITYc�.--.-,', 77T/7 111111171771111111 777//Y// 23 ISTINGIWATER mm�-Sii 24 R mm, S 771-M /////777 1111117111 25 ERVICE, LINE SIZE 77T17T 777,777U7 26 /7777777T777777777 7TUMI 27 SIZE EXISTING, 7TI-777 11171111 TRT7TI777 28 777/77 T/77 iowrNspEcTiom REQD 29 — 'CHARGE 17777111 TFF111uu I METER 30 FIRE�LINE-;-CHARGE REQM".SPRINKLER 11111M 11111114 TITUTR 31 -, tk,,� Ml i. m— M4 STREM I 32 33 -AN t, W. 777T17777777777 777RT //M/M 34 177TR7 777T7777 REM' 35 11IT171ff E 36 00 7777T 77 7 7 7 7 7 7 7 7/777T77 'CA BAS �D%M 37 TR TI T 7 Ti TTTF9 7 TITT7 7 T1- MATED CN;'SITETLM 38 -"DRkINAGEtMAIMAIN1* .4 //// M/Mly HALF. IOPEN tF 39 I I �Izkw N, sc:. 40 -4 13 -n too,— m RE V IEWED �,BY:; 's, MGR. �- f-,-f TLANNING, ENGMEMRING MGR. PUBLIC WORKS MGR. -07;�/, C1 OF EDMO ��il)S ZONE yl ( CONSTRUC 0 PERMIT APPLICATION B NA ,�r(7;�E OF AUDKhtib 711IJ 19101;1ee / BISIN LEGAL DESCRIPTION CHECKI SUBDIVISION NO. VAiLING ADDRESS e-le-5 e3,0P_-_Z 400"VZ) CITY TELEPHONE NUMBER PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP. ION A L - 0 0 D EG B D A R E L ES D S E S Z C RI P T 0 PU BLIC RIGHT OF e TING OSED AY CC PERM XIS Sea 721'e- 42A EXISTING REQUIRED DEDICATION PROPOSED / - NAME RIGHT OF WAY CONSTRUCTION PERMIT REQUIRED ADDRESS STREET USE PERMIT REQUIRED 0 CITY JTELEPHONE NUMBER SEE ENGINEERING MEMO DATED NAME i X , 2 ADDFfESS CITY TELEPHONE NUMBER 5 STATE LICENSE NUMBER r_1 & e!) C 12 J� I/ Legal Descriplion of Property - Include all easements (show below or attach four copies) /, --/ 0 x/ 70,�� 1 & ­1 - '41"t F� F" 14J N RESIDENTIAL F] PLUMBING ADDIALTER 1 1:1 COMMERCIAL E] MECHANICAL REPAIR r_1 RETAINING WALL SIGN DEMOLISH EXCAVATE D OR FILL FENCE ( x _FT) 1­7 PRE -MOVE INSPJ swim WOOD STOVE/ INSERT [:1 APT. BLDG El RENEWAL NUMBER OF STORIES NUMkH:HU1- oe,,� _9 IDWt:LLINU 7 NATURE OF WORK TO BE DONE (ATTACH PLOT PLAN) METER SIZE REMARKS SUPPLY SIZE la-11 a Z ffi W Z RE UNITS CC SIGN AREA I COMPENV. REVIEW ALLOWED I PROPOSED LETE i EXEMPT VARIANCE OR CU REVIEW BY ADB NO. [ORELINE 0 _FDATE YARD�� .t, I Jf HEIGHIJ LOT COVERAGE _77- 47 -7 FRONT SIDE REAR I 3-f - I CHECKED BY TYPE OF CO 1 7�_,o SPECIAL INSPECTOR ARE REQUIRED 0 YES ONO REMARKS /-kx M1611 / - Y/,; PLAN CHECK FEE BUILDING PLUMBING MECHAN ICAL This Permit covers work to be done on private property ONLY. GRADING/FILL Any construction on the public domain (curbs, sidewalks, driveways, marquees, etc.) will require separate permission. Permit Application: 180 Days Permit Limit: 1 Year - Provided Work is Started Within 180 Days "Applicant, on behalf of his or her spouse, heirs, assigns and w successors In interest, agrees to Indemnify, defend and hold to Uj harmless the City of Edmonds, Washington, Its officials, ,m employees, and agents from any and ill claims for damages of CC 4 whatever nature, arising directly or Indirectly from the Issuance x of this permit. Issuance of. this permit shall not be deemed to PLAN CHECK DEPOSIT waive or reduce any requirement of any city ordinance TOTAL AMOUNT DUE x 01 nor limit In any way the City's ability to enforce any ordinance provision." I hereby acknowledge that I have read this application; that the Information given Is correct; and that I am the owner, or the duly ATTENTION authorized agent of the owner. I agree to comply with city and THIS PERMIT state laws regulating construction; and In doing the work authoriz- AUTHORIZES ad thereby, no person will be employed In violation of the Labor ONLY THE Code of the State of Washington relating to Workmen's Compensa- WORK NOTED tiqn Insurance.. INSPECTION SIGNATURE (OWNER OR AGENT) DATE SIGNED DEPARTMENT q - CITY OF yaou EDMONDS ATTENTION 111.3202 holg AV,/ IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTU UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC CHAPTER 3. 102-78 0 Z Z Z 5 iL CODE HEIGHT 1 1? 17— OCCUPANCY OCCUPANT GROUP R_3 LOAD Z v_s;�4 '141 X VALUATION FEE 6 � 1 ��02 APPLICATION APPROVAL This application is not a permit until signed by the Building Official or his Deputy; and fees are paid, and receipt Is acknowledged in space provided. OFFICIAL'S SIGNATURE DATE RELEASED BY: DATE ORIGINAL — File YELLOW — Inspector ,PINK — Owner GOLD — Assessor . 1 �777 r.). 0 4 0 w A( 4 --l- 11400.4 �jc sc+ c"ic k (54.s" 'N POS Pa n 4 j ;"1530 10 —A ow Cc O,�K ki 2-:)! ti l*ne f ,I*c 2ECon 72 Z7% C4 0 \0 0 7' s1p e A. SITE P-AN, SCALE1 JL STANDARD DRAINAGE PLAN T USE* INFILTRATION SYSTEM INFILTRATIO N SysTEM NOTEI DO NO ON SLOPES OVER 15 PERCENT (15 PAGE p OF 2 FOOT RISE P ER 100 FEET HORIZONTAL) Ma - W I 0 DATE : / — /_:�_ — 65�11 MEMO TO: Building Division Planning Department FRO14: Engineering Division Public Works Department S UBJECT: After reviet-i of the subject Building Permit application, we have the following coraments Connection to City water system required. 2. Connection to City sanitary sewer system required. 3. Right-of-way permit required for any work on City property. 4. Oriveway slope not to exceed 14'. 5 . —Back-aa_'Cer val ve requ i red i f downs ta i rs PI umbing is below elevation of upstream manhole. 6. Water and sewer lines to be separated by 10 -foot minimum. S