21121 76TH AVE W.PDFIIIIIIIIIIII
6319
21121 76TH AVE W
ADDRESS: '76777 Y�VJeee
Zq
TAX ACCOUNT/PARCEL #: I)o 60 V�0 70&
BUILDING PERMIT (NEW STRUCTURE) #:
COVENANTS (RECORDED) FOR:
CRITICAL AREAS #: DETERMINATION: n Conditional Waiver [] Study Required [] Wai,ver
CRITICAL AREAS #: DETERMINATION: Conditional Waiver F1 Study Required El Waiver
DISCRETIONARY PERMIT #'S:
DRAINAGE PLAN DATED:
PARKING AGREEMENTS DATED:
EASEMENT(S) RECORD FOR:
PERMITS (OTHER — list permit #'s):
PLANNING DATA CHECKLIST DATED:
SCALED PLOT PLAN DATED:
SEWER LID FEE $:
LID #:
SHORT PLAT FILE:
LOT:
BLOCK -
F
SIDE SEWER AS BUILT DATED:
SIDE SEWER PERMIT(S) #:
GEOTECH REPORT DATED:
STREET USE/ENCROACHMENT PERMIT #:
FOR:
WATER METER TAP CARD DATED:
OTHER:
L:\TEMP\DST's\Forms\Jana's Street File Checklist 5-14-08.doc
0 "'REET FLE
1
i-,. *, .7 1;
NAME
mc-V-Picic L-C-A —1
LOU ADDRESS
cr
< CITY 1)80,52 ITELEPHONE NUMBER
ii�A I e231,6117
I /
PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP. TESCP
APPROVED BY
E T QUIRED DEDICATION
XIS ING
PROPOSED4
RIGHT OF WAY CONSTRUCTION PERMIT REQUIRED
STREET USE PERMIT REQUIRED .
SEE ENGINEERING MEMO DATED Z /,I:TVIEW BY
NAME e/f"44/j/ LA�, &0,0
Cr ADDRESS -Kee-x1416 Z�-10L-6171W
2 C--Q) METER SIZE SUPPLY SIZE FIXTURE UNITS
CITY T
C)tW4�E; ELEPHONE NUM13ER
Oz L L L) L�, �,j A 7 2-rZ—IREMARKS
STATE I ICENSE NUMB
Legal Description of Property - include all easements
z (show below or attach two copies)
9
L A—S.,
Uj
0
AI�Cc- L T, 6n7
1:1
NEW
RESIDENTIAL
PLUMBING
El
ADD/ALTER
COMMERCIAL
MECHANICAL
APT. BLDG.
REPAIR
SIGN
EXCAVATE
FENCE
DEMOLISH
OR FILL
(— x —FT)
REMODEL
CARPORT
GARAGE
swim
POOL
F WOOD STOVE/ r7
RETAINING WALL/
INSERT
ROCKERY
RENEWAL
EC &17W(lyat
#
6 NUMBER OF STORIES
W
NUMBER OF
0
DWELLING
I
cc
UNITS
NAJURE OF WORK TO BE DONE (ATTACH PLOT PLAN)
SIGN AREA ENV. REVIEW ADB NO.
ALLOWED PROPOSED COMPLETE EXEMPT
VARIANCE OR CU PLANNING REVIEW BY DATE
SETBACKS - FEET HEIGHT LOT COVERAGE
FRONT SIDE REAR I I
A4r-0txAVQ Aovo -4
?Pa!p�
CHECKED BY
OF CONSTRUCTION
CODE
HEIGHT
go
ITYPE
119hs
SPECIAL INSPECTOR
AREA
OCCUPANCY
OCCUPANT
REQUIRED
GROUP
LOAD
n YES I NO
REMARKS
PROGRESS INSPECTIONS PER UBC 305
641Z &-7— 140,00,621, ar k d
PLAN CHECK FEE
BUILDING
PLUMBING
MECHANICAL
This Permit covers work to be done on private property ONL GRADINGIFILL
Any construction on the public domain (curbs, sidewalks,
driveways, marquees, etc.) will require separate permission. STATE SURCHARGE
�ermit Application: 180 Days
ENERGY CODE
Permit Limit: 1 Year - Provided WorR is Started Within 180 Days
"Applicant, on behalf of his or her spouse, heirs, assigns and
successors in interest, agrees to indemnify, defend and hold
harmless the City of Edmonds, Washington, its officials,
employees, and agents from any and all claims for damages of]
11AVr,1Y -Z�S'Ae,117eW A04'
�� VALUATION I FEE NER
a
Er
LU
z
z
z
CL
a
z
whatever nature. arising directly or Indirectly frorn the Issuance
10
0
-11 N rA- t'-- L
0
Fop-
r, u m P-,-
r-7'
le
A4-c
k
r L.
L�IUILPIII
ii.177 -rpor4 =1
".08
L-;
. I
r_-, . F-i F- F
Lj
L-J
42
VAaAUM
-LAW
lot.
UN
LAW
rv,.C-)
TrN-61- VAkI4,
cwr-cLjf Wl-)
L-1
f%qrfi---
MET FILE
Q.,_ITE PLAN
Vol
4,CITYqOF EDMONDS f-;�t7=0 FLE Permit No. 06 4e
COMMUNITY SERVICES DEPARTMENT =_L� lk9
RIGHT-OF-WAY CONSTRUCTION PERMIT Issue Date
Z
0
W
Cn
U
Ix
0
�J.
A. 9 Owner: The Greenwood Group, Inc. B. 0 Contractor: Karnak Inc.
Name Name
13401 BP -I -Red Rd', #B-4 P.O. Box 1464
Mailing Address Maili Address
Bellevue, WA 98005 11, WA 98011
City State Zip City State Zip
KARNAI*195K8 — (206)481-2904
State License Number Telephone Number
C. 9 Address or Vicinity of Construction: 21125 76th Ave West
Type of Work to be Done: add 160 feet of storm drain
D. 0 Work in Connection With:
E. 0 Pavement Cut: FKI Y El N
El Sub or Plat
KI Commercial
APPLICANT TO READ AND SIGN
D Single Family El City Projects
0 Multifamily 0 Utility
F. 0 Size of Cut: 5 X 200
INDEMNITY: Applicant understands and by his signature to this application, agrees to hold the City of Edmonds
harmless from any injuries, damages, or claims of any kind or description whatsoever, forseen or unforseen, that may
be made against the City of Edmonds, or any of its departments or employees, including or not limited to the defense
of any legal proceedings including defense costs, court costs, and attorney fees by reason of granting this permit.
THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE
YEAR FOLLOWING THE FINAL INSPECTION AND ACCEPTANCE OF THE WORK.
Estimated restoration fees will be held until the final street patch is completed by City forces, at which time a debit or credit will be
processed for issuance to the applicant.
• A 24 hour notice is required for inspection; Please call Engineering: 771-3202
• Work is to be inspected during progress and at completion.
• Restoration to be in accordance with City Code.
• Street to be kept clean at all times.
• Traffic Control to be in accordance with City regulations.
• All street -cut ditches must be patched with asphalt or City approved material prior to end of working day;
NO EXCEPTIONS.
I understand the above and that this ermit must be available at the job site for inspection purposes at all times.
Signature: Date:- �7
Owner or Contractor
This Permit Must be Posted at the Job Site For Inspection Purposes
Call DIAL -A -DIG Prior to Beginning Work
APPROVED BY:
Time Authorized: Void after— "*�_days.
Special Conditions:
RELEASED BY: Date
PERMIT FEE: A,5 0. 0 C)
Restoration Fee:
Receipt No.: /(3991
Fund I I I Fee:
Street Cut Dimensions:
INSPECTED BY
NO WORK TO BEGIN PRIOR TO PERMIT ISSUANCE
Date
Eng. Div. March 1989
RIGHT OF WAY CONSTRUCTION PERMIT ROUTING FORM
CONTRACTOR T-()C DATE PERMIT RECEIVED '6-'8-89
WORK ADDRESS
PUBLIC WORKS DATE SENT COMMENTS: 1989
REVIEW BY BOBBY MILLS AIIIC"'�
nc
REVIEW BY BILL STROUD 4��I"Xj
7
REVIEW BY ARCHIE BRENA
FROM PUBLIC WORKS, ROUTE TO NOEL MILLER IN THE ENGINEERING DEPARTMENT
ENGINEERING DATE SENT A COMMENTS:
REVIEW BY NOEL MILLER
REVIEW BY DAN SMITH L,,11a-fr2
/'coy
FROM
ENGINEERING, ROUTE TO JEANNINE
IN THE
BUILDING DEPARTMENT
DATE
PERMIT ISSUED S -2)-M
PERMIT
# 89
Rev. 1/4/89
mo
R/WFORM/TXTRECEP
STREET FILE
iV CONSTRUCTION INC.
13401 Bel -Red Rd., Suite B-4
Belleuve, WA 98005
(206) 641-0722
August 3, 1990
City of Edmonds
Engineering Dept.
250 - 5th Ave N.
Edmonds, WA 98020
Attn: Gordon
RE: Summit Car Wash
7525 - 212th St. SW
Dear Gordon,
heczi VE: 0
A UG 6 7990
ENG11VE%N(,
7
This letter is to advise you that the balance of the extruded
curbing has been installed.
Sincerely,
Steve Guthrie
President
SG: sl
Commercial Builders
STREET FILE 0
CITY OF EDMONDS
250 - 5TH AVE. N. - EDMONDS, WA 98020 - (206) 771-3202
COMMUNITY SERVICES:
Public Works 9 Planning 9 Parks and Recreation * Engineering
� 8 9 0 . 1 9 13
December 1, 1989
Pace.Construction, Inc:
13401 Bel -Red Road, Suite B-4
Bellevue, WA. 98005
Attention: Rick Carlisle
Re: Grease Monkey/Car Wash Project
212th St. S.W. and 76th Ave. W.
Gentlemen:
� �V_7
LARRY S NALIGHTEN
MAYOR
Yesterday, Dan Smith and I reviewed the sidewalk and driveway apron
cement concrete work adjacent to the site*with your project
superintendent, Denton Talbert. The following concrete work is
required as a part of the project:
PETER E. HAHN
DIRECTOR
1. Remove the three (3) existing driveway aprons along 76th Ave. W.
and replace with one (1) 30 foot wide driveway apron, along with
new concrete curb, gutter and sidewalk.
I
2. Remove and replace three (3) cracked sidewalk panels.
3. On 212th St. S.W., beginning at the easterly edge of the project,
remove and replace approxiiiiately 180 lineal feet of cement
concrete sidewalk curb and gutter (measured by your
superintendent). This area would include the adjacent driveway
apron to the east, which was partially damaged by construction
equipment on this project. This also includes the two (2)
existing concrete driveway aprons off of 212th St., along with
other defective sidewalk panels.
Some of the damage to the sidewalk on 212th St. was created by the City
of Edmonds in conjunction with repairing watermains. The City will,
therefore, contribute $600'for *,repairs. If you believe that this
figure is not equitable, please let me know, and I will schedule City
crews to make these repairs immediately.
Attached is a,co.py.of the City of Edmonds Development Code regarding
sidewalk repairs for your reference. Please call me if you have any
questions.
Sincerely yours,
NOEL F. MILLER, P.E.
Construction Engineer
Alberts
NFM/sdt I
Attachment Incorporated August 11, 1890 9
GREASE/TXTST530 Sister Cities International — Hekinar�', Japan
I El�
No
18.90.040 DUTY TO MAINTAIN
The owner of property adjacent to a sidewalk shall maintain the
sidewalk and planting strip as follows:
A. Sidewalks. The owner shall maintain existing hard surface
siIdewalks by keeping them free of litter, debris, ice and
snowi and by repairing defect in -the surface with materials
approved by the Director of Public Works. '
B. Plantinq Strip. The owner shall maintain any portion of the
City right-of-way between -the edge of the street or alley and
the property line of the owner's property. Maintenance
includes keeping the planting strip free of litter and
debris, watering and trimming vegetation, repairing rockerie4
or retaining walls, and other work necessary to protect the
public in its use of, the sidewalk and the public right-of-
way.
C. City Responsibility. The City will pay one-half of the costs
necessary to rebuild a sidewalk less than ten years old, and
more than five years old. If the sidewalk is less than five
years old, the City will perform the needed rebuilding. The
City -will not pay to repair damage caused by the owner.
D. Notice. The Director of Public Works may order an owner to
conform to this section by sending notice by certified
mail. If the work is not done within the period of time
specified in the notice, the Director may have the work done
and charge the cost to the owner pursuant to statutory
authorization, which charge'shall be a lien on the property
if not paid. (Ord. 2477 §2, 1985.1 1
I
Z
0
W
U
1:4
0
"4
CITY OF EDMONDS Permit No. ff-IrM.,
COMMUNITY SERVICES DEPARTMENT
Issue Date
RIGHT-OF-WAY CONSTRUCTION PERM �� U
A. * Owner: Lakeshore Investments B. * Contractor: Pace Construction Inc.
Name. Name
P.O. Box 338 13401 Bel -Red Rd, #B-4
Mailing Address Mailing Address
Edmfids, WA 98020 Bellevue , WA 98005
City State Zip City State Zip
PACECI*110LM (206)641-0722
State License Number Telephone Number
C. *Address or Vicinity of Construction: .212th & 76-th
Type of Work to be Done: sidewalk repairs
D. 0 Work in Connection With: 0 Sub or Plat El Single Family El City Projects
10 Commercial 0 Multifamily 0 Utility
E. * Pavement Cut: El Y 0 N F. * Size of Cut: - X
APPLICANT TO READ AND SIGN
INDEMNITY: Applicant understands and by his signature to this application, agrees to hold the City of Edmonds
harmless from any injuries, damages, or claims of any kind or description whatsoever, forseen or unforseen, that may
be made against the City of Edmonds, or any of its departments or employees, including or not limited to the defense
of any legal proceedings including defense costs, court costs, and attorney fees by reason of granting this permit.
THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE
YEAR FOLLOWING THE FINAL INSPECTION AND ACCEPTANCE OF THE WORK.
Estimated restoration fees will be held until the final street patch is completed by City forces, at which time a debit or credit will be
processed for issuance to the applicant.
• A 24 hour notice is required for inspection; Please call Engineering: 771-3202
• Work is to be inspected during progress and at completion.
• Restoration to be in accordance with City Code.
• Street to be kept clean at all times.
• Traffic Control to be in accordance with City regulations.
• All street -cut ditches must be patched with asphalt or City approved material prior to end of working day;
NO EXCEPTIONS.
I understand the above and that this p5ynit must be available at the job site for inspection purposes at all times.
Signature: Date://—,27-
Owner or Contractor
This Permit Must be Posted at the Job Site For Inspection Purposes
Call DIAL -A -DIG Prior to Beginning Work
APPROVED BY:
Time Authorized: Void after -I& days.
Special Conditions -
PERMIT FEE: A15) 00,
Restoration Fee:
Receipt No. -
Fund I I I
Street Cut Dimensions:
RELEASED BY: Date . INSPECTED BY Date
NO WORK TO BEGIN PRIOR TO PERMIT ISSUANCE
Eng. Div. March 1989
W
e"R"r-ET FILE
BUSH, ROED & HITCHINGS, [al
2009 Minor Avenue East
Seattle, WaShington 98102
Area 206/323-4144
Fax 206 / 323-7135
July 28, 1989
Mr. Jerry Haugth
City of Edmonds, Engineering
250 Fifth Avenue North
Edmonds, WA 98020
Re: Grease Monkey/Car Wash
21125 - 76th Avenue West
Permit Application No. 145
Dear Mr. Haugth:
In response to your plan review comments received yesterday by telephone, we
have made the following changes to the Grading & Drainage Plan:
1. Storm drain pipes with a slope = 1%, we specify as concrete or PVC
material. PVC pipe with less than 3 feet of cover will require the
contractor to protect pipe from heavy loads during construction until
pavement is in place, see note on Plan.
2. An oil/water separator, baffle type vault has been added to the plan at
the storm drain outfall located near the southeast property corner. We
are indicating vault to be a "Utility Vault" Model No. 5106-A, with a
1,570 gallon capacity or equal. We investigated the possible use of a
smaller capacity vault, and conclude that we should use the 5106-A to
allow enough time for oil and particle separation.
Please contact me if you have further requirements or comments regarding the
Grading and Drainage Plan.
Si cerel
ron DuPont
BGD/cd
Enclosure
�,-ET HLE
BUSH, ROED & HITCHINGS, INC.
2009 Minor Avenue East
Seattle, Washington 98102
Area 206/323-4144
Fax 206/323-7135
July 18, 1989
Mr. Jerry Haugth
City of Edmonds - Engineering
250 5th Avenue North
Edmonds, WA 98020
RE: "Grease Monkey/Car Wash"
21125 76th Avenue West
Permit Application No. 145
Dear Mr. Haugth:
JOL I �) 1989
FNGINEERING
The proposed development referenced above will include the following:
1. The removal of the existing building, canopy and the majority of the
existing pavement.
2. The removal of the existing storm drain catch basin and drain pipe, which
is discharging at the curb line of 212th Street Southwest.
3. Construction of two new buildings and the parking and access pavement
surface.
4. Construction of the new storm drains which will include the extension of
the existing storm drain in 212th Street.
The new site configuration will have 15,720 square feet of new impervious area
(buildings and pavement) which replaces the existing impervious surface area
of 14,750 square feet. It is our understanding that the City of Edmonds Vill
not require a storm detention system for this minor change in total impervious
area. Please enter this letter into your records as confirmation of this
understanding.
Sincerely,
Byron G. DuPont
BGD/scr
cc: Rick Carlile, Pace Construction
CITY OF EDMONDS
ASSET INFORMATION SHEET
/NEW -
1-1 ADDITION
RETIREMENT
lim, 7 FILE
ST :.T
ASSET NO
ADDITION TO ASSET NO.
DESCRIPTION
SERIAL NO.
LOCATION
DEPT. NO.
* * PURCHASE ORDER NO.
PURCHASE ORDER DATE
COST
PROJECT NUMBER w NQ� () 05
PROJECT COM PLETION DATE (32--2-8 �?C)
COST 9 1 L-1 " 7,2
B.A.R.S. ACCOUNT NO. q I I - 000 - c) (I - -5 Lis --
ESTIMATED LIFE IS LA
i
INITIATED BY
DATE
APPROVED BY
"SUBMIT ASSET INFORMATION SHEET WITH FINAL PAYMENT REQUEST
*SUBMIT ASSET INFORMATION SHEET UPON CLOSE OF PROJECT
ACCOUNTING ONLY
VDEPRECIATE
MONTHLY DEPRECIATION AMOUNT
ANNUAL DEPRECIATION AMOUNT
0 G.L. ENTRY
REFERENCE
kyp) INITIAL
DATE
VERIFIED BY
PROCESSED
BATCH NO.
DEPARTMENT FILE
E- B -P E R, WLT
CITY of EDI fNDS SO E -SEW.
"REET FILE
For Inspection Call 771-32020 1 PERMIT No. 08121
Address of Construction:
Property Legal Description.(Include all easements):.'
Owner and/or Builder: 1-4 r_ lo VIA RAI I lNrFP
LIFT STATI
Contractor & License No:
Singl:e Family Residence
Multi -Family (No. of Units
Commercial X (No. of fixture Units
Invasion into City Right -of -Way: No Yes (If Yes, Right -of -Way
Construction Permit required. Call One -Call -Center (3-7800-424-5555) before any
excavation.)
Cross other Private Property: No Yes (If Yes', easement required,
attach legal description and county easement number.)
PLEASE READ THE ITEMS"LISTED ON THE BACK
RECEIYED
JAN 16 1990
I certify that I havd read an�Kshall comply Date
with the items listed on the back. PUBLIC WORKS
Permit Fee:
Trunk Charge: e—
Assessment Fee:
Partial Inspection:
'Issued By:
'Date Issued:
Receipt No.: 4
. . (:� (::17 6 4=4
Comments Date Initial
1A P6
Final Inspection Approved:
Date 'rnitial
co
Rejected:
C)
Reason —Ta—te —5—itial
(A
PERMIT MUST BE POSTED ON JOB SITE
cj� Wh-ite Copy File Green Copy Inspector Buff Copy Applicant
NOTICE:
No warranty of accuracy.
The information shown on the attached
map(s) was compiled for use by the City of
Edmonds, its Employees and Consultants.
The City of Edmonds does not warrant the
accuracy of anything set forth on these
map(s). Any person or entity requesting a
copy should conduct an independent
inquiry regarding the information shown on
the map(s), including, but not limited to,
the location of any sewer stub shown. Such
sewer stubs may or may not exist and may
or may not exist at the location shown.
Neither the City of Edmonds nor its
employees or officers shall be liable for the
information given on this map(s), nor for
any one representation provided based
upon said map(s).
, The City of Edmonds Side Sewer Drawing EASEMENT NO - ------------------------------ .............
NEW CONSTRUCTION 'REPAIRS F-1 LID NO . .................. . ASMT. NO - ------------------
OWNER ............... - ------------------------------------------------------------ ................... CONTRACTOR .......
- - ----------------------------------------- PERMIT NO.
JOB ADDRESS --- QJA---,l-.-k ---- ---- LEGAL DESCRIPTION: LOT NO - ------------- ------------------------ BLOCK NO - ------------------------------------
-------------------------------------------------------------------------------------------------------------------- . .... ...
LlflG�—R
:Vj,Q
A SALLlf�GER
NAME OF ADDITION ......... ..................................... ...... ... ........ ..... .... LIFT .. S-TA:jj4)N.--.-
-T,
0
Ll ?
(e If el<) --.,/ * �l
—t-0 q. V. e- \— - , ,�t/
rc.4S,e-
00
c,: %
-� PWW-0001-11/75(REV.11/78)
;Z I I � I - '7 Vr` A-Lr-.
te )( &(t
xe--, fee S \A-r M4-f-
- 14. i;;'
eID
4
T
Approved:
DATE.1 ...... ----------------- ------- -------------------
DATE: P.TREET FILE
MEMO TO: Permit Coordinator, Building Division
FROM: Dan Smith, Engineering Inspector
ADDRESS: C� / /")- / /& ry
OWNER:
After review of the subject building permit application, we fiave the
following comments:
r
1) Construction hours are: WEEKDAYS 7:00am to 10:00pm
WEEKENDSIHOLIDAYS 10:00am to 6:00pm
2) A Right -of -Way construction permit is required for any work on
City property.
3) Co nne'ction to city water system required.
4) Connection to City sanitary sewer system required; obtain separate
permit.
5) Water and sewer lines to be separoted by 10 foot minimum.
6) Driveway must be paved a minimum of 20 feet back from City
right-of-way; separate permit required.
7) Driveway slope not to exceed 14%.
8) Back water valve -required i f downstairs plumbing is below
......elevation of upstream manhole.
9) Builder/Owner responsible for,containing all temporary runoff and
erosion control on site. Construction may not impact neighboring
properties in any way.
10) No burning of construction refuse without approval from Fire Dept.
11) Street to be kept clean of debris, dirt, mud, and construction
materials.- Contractor responsible for dust control.
12) Inspection required on drainage system, c ' atch basin -installation,
driveways, and sidewalks. A final engineering inspection is
required prior to the b * uilding division granting occupancy.,
'69-08-30 23:53 F.2
0 b i t-li-L'E."i FILE 0
4-"-.
CONSTRUCTION INC.
13401 Bel -Red Rd., SUlte 8-4
Beueuve, WA 9800S
GO) 641-0722
August 29, 1989
Gordon Hyde
Engineering Coordinator
City of Edmonds
250 5th Ave. N.
Edmonds, Wa. 98020
RE: Joint access on 76th for Grease Monkey and 7-11
Dear Mr Hyde,
Per your request, I have submItted the proposal for a thirty
foot (net) curb cut to be used as a joint access for use by
Grease Monkey and 7-11 to the property owners, Tom
Strickland, and Bob Porterfield, as well as the management
of the 7-11 parcel. As this is a reasonalb'16 request and
will all.ow for safer traffic flow both'on and off site, all
the parties concerned ag�reed to this being a condition of
the permit. I am attaching a sketch showing our proposed
placement of the curb cut as you and I have discussed. The
location is described as starting at a point 5 feet south of
the northern most point of the existing easement, and
vroceeding south a net distance of thirty feet.
Our noreement to this is'also predicated on the existing bus
stop being moved. at no expense to us, to a point not less
than 20 feet south of the new curb cut.
Upon review of our conditional use permit, this common
access is in conflict with condition number 9 of the
decision as issued by the Hearing Examiner. As this change.
is in the best interest of The City of Edmonds and the
public safety we are aasuming that condition 9 of the C.U,P.
is waived. If this is not the case please inform us by
September 1, 1989.
Sincerely, r
Rick Carlile
cc; Lakeshore Investments
Bob Porterfield
Vto
Commercial Suildem
189-08-30 23:52 0
7-j
P. 1
AA
W CONSTRUCTION INC.
13401 1301-126d Rd., Suite B-4
Belleuve, WA qMs
(206) 641-0722
Tr-kampim INMIMTION SMILIT
b
rx. : �2 t-e& cb e, Me A V444 / 4-.4%r- 1 A/ �,6 �
PTCM: ce e- Tell
FAX
ad,
13401 llal-Rcd Ro. SUjAm B-4
Ballovue, WA 90005
al�t'+ -14"k
Thom ara pages beirxj twanomittcJ, includinSr thi5 cavcr almot.
Xf YOU dO n0l; x0c0ivc 311 L�09CG, PIC*= Contact tho sander.
gpx= INGMWrIONS AND/011 WMS:
Commerclal aullders
IT
0
City of Edmonds EET FILE
(71NTER-OFFICE CORRESPONDENCE
f
TO FROM D A T E 7IM; /�O
S UBJECT /46� lllr,� A4-TA00w 1-4AUG
ENGINEERING
311989
PUBLIC
Cf
KARNAK., INC.
1 (206) 483-2904
Utility Development Specialists
i
P.O. BOX W4 BOTHELL, WA
AUGUST 10, 1989 MET FILE
PACE CONSTRUCTION
13401 Bellevue Redmond Road Suite B-4 RECEIVE:D
Bellevue, Washington 98005
ATTN: RICK CARLILE A U G 14 198.9
RE: GREASE MONKEY/CAR WASH WORK DELAY.. ENGINEERING
Please find enclosed our hourly rates for equipment and labor relating to the standby
time at 21125 76th Ave. W. (Grease Monkey). As the delay' was above and beyond our
cont . rol and our schedule was set to your and the city's demand for storm drainage
completion -- we therefore cannot suffer the loss of a complete work day.
I feel compensation for the equipment, signs and labor to be just and fair. However,
the bright side to this is we found some fill-in work for most of the crew. The
breakdown is such:
American Trackhoe 8 Hrs. @ $125.00/Hr. $1,000.00
580 Backhoe 8 Hrs. @ $ 55.00/Hr. $ 440.00
Pipelayers 5 Ea. 4 Hrs. 20 Hrs. @ $ 25.00/Hr. $ 500.00
Supervisor & Truck, 4 Hrs. @ *$ 40.00/Hr.
$ 160.00
Signs & Barricades' L.S. $ 200.00
TOTAL DUE $2,340.00
Also a 10 CY load of ATB for temporary patch was delivered on -site
at 9:am. The decision to stop work did not allow time to cancel.
If this material is unusable when we start work we will want additional
compensation for this item.
I realize this is an unfortunate situation, the decision was not ours, the
scheduling was not ours therefore, the lost time will not be ours.
4 an4k,
i
aniel f�'B�rown, President
cc : City Of Edmonds, Noel Miller.
VILE
IR
HONG CONSULTING ENGINEERS','INC.
Caote&d*W Ergkim" 9 MotwW To" * Construction Quosty Control kwP*dI%NskvE0llllG
INSPECTION PkEPOflT
PROJECT: DATE:
LOCATION: -L % IL A- Lo 4-%-% GENERAL CONTRACTOR: K v% v- -L-c
vv% 0,1 CONTRACTOR'S REP : T) c., /\ "?, v e o,)
JOB NUMBER: a a 4t OUR REPRESENTATIVE: -15 4F
PERMIT NO: SUB. CONTRACTOR:
ARCH: RUR- REP-
ENGR:
c, C-^C(
i>i.7-c- OLftA-ce_-�C�\ 1:::� v LD
v.:, - CJ 0 t
0 0,
0 �A Zc C-0.
kkz. vz.�VN
CV\. vl",t�: 1A --c V; 0 -nk so �\A
\--3 C--15 c,- 0 1-5 57. s "It cf -711
As
-l",-W Ova CIA%.^^
c-A
0 k-e- VA 4/k-s- "o
C -CA 0
LG
PAG E OF
C; e IV
Geotechnical Engineering * Moterial Testing o Construction Qualitq Control ln3pe r?"o '^00
OIELD DENSITY REPORT
Project: V'. t-, V,
Test Apparatus, P11V,LkA,&-,A
Mach
No: kwd)(.
Address:.... I IL +-t, .................
— Soil Description:,
SAN
V
Job Number: 4C-('0 .........
.. ..... Temperature Air:-
C
Soil: 0 C
Date Tested: . A - ZA By:
Specified Compaction:
%
Client: ......
Compaction Standard: T rl ... 0.
.. ................. N cl%v� . i a
Minimum Dry Density: ...... . ...
. .. ... .. ....
PCF
.... .... %00-01 6-
Maximum Dry Density:
PCF
Attention: .......... .................
... Optimum M t.: ..... .... . .. ....
0/0
cc.,, t
. .. .... ....
e
16 V'U�
........... ... ... - ... .. ............ I ............. ...... .....
.............
L;
Test No.
T -
'!>T
1>T- 4
Location
......... ..... .. .....
. .....
.. .
....
Elevation
...... ..
..... ..
....... ...
Wet Density — PCF
?f"t-C wt
o% L
Moisture Content — %
5
00.0
Dry Density — PCF
7A .74
1 o
I
.............
......
I I -CA
Compaction — %
'� 5. -1
0-1 (, .'2—
'Jig
9g.-L
Remarks: ....... .. ........
............. .
Y. k
Y. " V"3'
- ........ ....... .
')Soo I
. ........... .... ... . ... .. . ........ . .... ...... ...
.... ..... . I .... .. . ....
-'C 4,
........... ............
k7r", � � C- L—A
Ok C-4 C ?"T.-A
mii mbib puriurnit:u in accorcance wan Ab I M
ie STREET FILE
HONG CONSULTING ENGINEEk*,j, INC. SC vf-'D
Vk , F, I
o Geotechnical Engineering 9 Moiterial Testing * Construction Quality Control lnsp�gw?
FIELD DENSITY REPORT
Project: .........
CA -A- VN C�V, a ,, C -
Test Apparatus: v cLL4/-A Mach. No.: k-u--K
Address:.
Soil Description:
........ ....
.... ........
Job Number:
4r k,
Temperature Air:
0C Soil: ..... OC
Date Tested:
... $7. BY:
Specified Compaction: .........
q �7> %
Client: ................
... .................. .... .......... ...... .. ............
Compaction Sta ndard:
VA '5 T
- ......
(-'I- V -E-s- V1 k-YQ,-V 0 P � ........
Minimum Dry Density:
PCF
- . ......
Maximum Dr y Density:
PCF
Attention: .
%
Optimum M.C.:
....... I .... - .... I
Dc, VQ";n
Test No.
-b-77-u . .
...... .. ....
.... . ..... .. ...
L ocat i o n
Elevation
. ...... T-,x-
..... . . ...
Wet Density — PCF
Moisture Content — %
Dry Density — PCF
Compaction — %
cis
iw iebib puriormeci in accorcance WIM A51M
STREET FLE
HONG CONSULTING ENGINEERS,'INC. 0
GeotechnicW EnalneerInQ o' Mciteriol Te3ting 0 Con3truction Qualit' 0 2%jqs9
4 Control lnspe�G
INSPECTION REPORT
PROJECT: KARI!,0140 loc T-Rc--,,jcH— DATE: 4, a c, Lis T 1 ).0 99
LOCATION: 75-00 4-?, 7(.00 l3locks GENERAL CONTRACTOR:
CONTRACTOR'S REP DAAJ 13RQ<-VA1
A 1,�I- 7R A v UJ -
JOB NUMBER: OUR REPRESENTATIVE: P-6b C--A(Jf3,'O,',J
PERMIT NO: SUB. CONTRACTOR:
�ARCH: SUB. REP:
ENGR:
re-Air-y7eel -20, Y.- W7) no -y-
I?
45 X1 71 e-
ea. y..,,zi 1, e
47e7" "7-S a/- e,-Xlf
�Idc,z-
4�/161 K. �/�?e 1/1-�;,//
�a 4c e. iv e 5 4cla 2-4,� w
z
alY -re"K
PAGE OF1
STREET FU 0 � . j\/F.0
C F.
FIELD DENSITY REPORT
Project:...k'A iF,, 0 A K hQ C -1 P-,F tl -,� '-H ... ....
Test Apparatus: 0_ P -Aj
Mach. No.:, ...............
Address: AV� ...
Soil Description: aro-V
SA Kj-!�
Job Number:.,...
Temperature Air: 7:5- 105= Soil:
�oc
Date Tested: J I- By: F FA 0 i-:�! 0 i�
Specified Compaction:
%
Client:.eXC-�, 01-Af<4-151-G
Compaction. Standard: A S
....
Minimum Dry Density: .......
. ... ....
-PCF
......... - ...... I ......... ..... ........ .... . .... ..... . .........
Maximum Dry Density: . .. ....
PCF
Attention: ..... X;>,&A . .... .... ...
.... . .. . ....
Optimum M.C.:
9!7
.......... ............. . .......... . .....
..........
S041--- .-S'> C,
-j
Test No.
Location Fro,..% e-'K 1 9
1-1 �Y'eo C11
+(-e-C4
11.11si, K
i"
0�'
'7-4c16 bill-,
P" tc
.. . ......
... 0 3. 7
...................
Elevation
................
. . .........
.... .. .... ..... ...
.. gx
... ... . ..... ......... ...
.......... .............
Wet Density — PCF
.................
................
14 *3
. .. ..... .
Moisture Content — %
--4v .......... - .... ........ - ... ............
Z5
-- .......... ...... ....
7.75
... .......
Dry Density — PCF
135-,g
Compaction — %
0 -
Reviewed B�:.
P E
mii tutitzi puriormea in accoraance with ASTM
2003
0 STREET FILE
-_-----
������� CONSULTING �����U������� U��� ���
oo��'n��� �~"��nn����x.nnn��� u.nn��nn�x.x~����, no��~��������� . =~~-
��(�����
* Ge�wc6Nc�Emg|needog * Material Testing * Cmmmxru�|pn��u�|t@CmmtrcuImw���`~" ��q+
:INEERING
COMPACTION TEST RESULTS
Project:_ Inc
Trench Sample Number:
Addneoo:- WA.___---
Sample Location:
- _-- -------_-
____-_-_ Sample Description:- Brown
silty
SAND with
Job Number: T�U04G
3Om8 gravel
Date Tested: _8-10-89
By: 3Y_---__' Minimum Dry Denuity:
PCF
Client:_.GrouD
_ _ Maximum Dry Density:
}35^5
POF
Optimum Moisture Content: _
8'0
96
Attention:. 'Ri�h Carlisle
Natural Moisture Content:
8^8
96
| 1*0
A5TM D-1557
CnmpocionSb�ndund�_________________
Y.
Hammer VV�igh�l0 |bs.
130
Hammer Drop:. l8 ins.
5
No. of layers:. _
125
Number of blows/layer: 25
c� mo|d�_____4 inu.
Diameter___
`uo
Height of mo|d:____________ 4 inn.
Volume of mo|d:l/3ou.ft.
ns
LL
Surcharge Weight: |bu.
O
C .
Vibratory Amp!itude:.________
� �m
Vibratory Frequency:
\�-
o
Vibratory Time: _ min.
| c 1n«
C ompactive Effort: ft.lbs./ou.
100
95
90
85
80
1007
u m is 20 25 no no 40
Moisture Content — %
All tests performed maccordance with ASTw
t"
0
STREET FILE
MERRICK LEWZ ARCHITECT REC':1 VED
15446
BEL-RED RD.
SUITE 410
REDMOND
WASHINGTON
98052
(206)881-8117
June 1, 1989
FNGINEERING
Mr. Gordon Hyde
Office of the City Engineer
City of Edmonds
250 5th Ave. N.
Edmonds, WA 98020
RE: Traffic Mitigation for Proposed Grease Monkey/Car Wash
Businesses
Dear Gordon:
I am writing to confirm the results of.our meeting, yesterday,
regarding the traffic mitigation fees for the proposed Grease
Monkey/Car Wash on the northeast corner of 212 Street S.W. and
tb Ave. W.'in Edmonds.
As we discussed, the PM Peak traffic generation figure of ele-
ven trips for the Grease Monkey, and five trips for the car wash,
for a total of sixteen trips will be used.
Per the College Place Traffic Study, dated April 10, 1989, a
cost of $114.00 per trip will be applied, resulting in a total
mitigating cost of $1,824.00. This amount is acceptable to my
clients, and it is our understanding that this will satisfy the
traffic mitigation condition of our Conditional Use Application
#CU-36-89.
If you have any questions, please call.
Sincerely,
ENTZ
AMERCK L ARCHIT T
Merrick D. Lentz, AIA
cc: Ken Walters
Steve Guthrie
05/15/89 10:30 2t 8857697
8 TER E E T F I LEE
May 15, 1989
Mr. Gordon Hyde
office of the City Engineer
City of Edmonds
250 5th Ave. N.
Eamonds, WA 98020
RE: Traffic Analysis for Conditional Use Request
Dear Gordon:
ptvd,�.�
This traffic analysis will supplement the information recently
submitted for Conditional Use Permit approval for the property
at the northeast corner of the intersection of 76th Ave. W. and
S.W. 212th Street, currently being considered for development
of the Grease Monkey and Cat- Wash bosinesses. Since the ITE
Manual has limited trip generation data for these uses, we have
assembled documentation specifically related to the industry.
The Car Wash data is supported by customer and retail sales in-
formation for approximately 400 self service car wash operators.
The gross income figures, divided by the annual number of cus-
tomers and factored into weekly numbers equals 568 customers
per week. Using ITE daily trip rates, two-thirds of the weekly
number will come an weekdays. Therefore, an average weekday
will account for 152 vehicle trips. The ITE Manual allows a
discount of 25-60% for service retail facilities for passerby
or "drop -by" trips.
Assuming a 40% discount, the average new trips generated per
weekday is 91. Per ITE standards, approximately 5% of the use
will occur at the PM Peak, resulting in a trip generation of
5 PM Peak trips.
The data for Crease Monkey is based on national data for 150
facilities. Per the attached data sheet, a typical facility
will average Go customers per day. Since the store is open
Ib446 seven days per week, the ITE daily trip rate allows the typical
BEL-PED RD. daily weekday trip count of 49 cu5tomers, or 98 vehicle trips,
SU11i 410 to be established, Using the 40% discount as explained above,
PFDMOND 59 new customer trips are generated with this use. Three em-
WASHINGION
98052 ployees will add 6, for a total of 65 new vehicle trips gener-
(206) 881-8117 ated. ITE Manual data supports a 5% PM Peak rate, or three
trips generated during PM Peak.
02
2 8857697
0
03
The development of both uses will therefore result in eight new
PM Peak trips generated. It is also significant to identify the
PM Peak of the existing service station. Using ITE Manual fig-
ures, the existing use generates three FM Peak trips. It is
our opinion that this should be a consideration in determining
the total effect of this development or the traffic patterns.
If you have any further questions or comments, I will be happy
to discuss them with you.
Sincerely,
MERRICK LENTZ ARCHITECT
Merrick D. Lentz, AIA
cc: The Greenwood Group
INC -
GREASZ MONKEY IMMRNATIONAL,
1660 Wynkoop #1160
Denver, Colorado 80202
-534-1660
Telephonet 303
Talecooys -303-5-34-290.6
FACSIMILE MESSAGE
TIME
DATV;��
ENT -al
Rmc X.O.Tr 4e 6
any)
ATTENTIONs—T2
TZLECOPY c,.TELEPHONE # op—gz
FROM a
. AT-s
TOTAL NUMBER OF PAGES (including cover page)
N
r,
TOTAL PAGE.001
GREA5&
MONKEY LUE)HISLAIJUN
CLN-jEt
PRO -FORMA BREAK EVEN AND PROJECTIONS
TmRFP
YFaR awvRamr
raR
rortmT PPR nav
Ar
Average Car -Count per
Day..
ANNUAL GROVIN
RATE AFTER XONTH.3�
month 13,il
month- : jai
i J
Month 2.
19
Month 14.
month-
55
lonth-3.
20
month 15.
8
Month 4.
24
Month 16.
49-t,
MonU 22.
s
26.
Month 17,
NO.. !to
t
Month.
2
Month Ia.
Month -7
3
Month 19.
boat jJ)'.
5
Month 0.
33
hooth 20.
NORth 32.
month 9.
month 21,
S2.
both 33.
Se
Month 10
38
Month 22.
0-3
month 34.
59
tl
Month 11
40
Month 23...
S4
Month 35.
59:
S
Month 12
41
24.
SS
Month 36.
60
4
ii� . j _ . ,
WAMIIIRMI�
0
W IA In
b- D- $-
LU AM
., " ul
xxx
W IA vi
coo
0 C,
C4
C4 V
A A A
C14 C4 C4
0
0
S
4--S
5 — 6p
cle5
t
t Rs v L-5-e ^6 e-
PASSE�--BY
(Po7o
4
o- r c *v" c6 ca 4e--s
3 1-- r-,* F S i
2 Z- 7p-- 1 P-
ZO -(T�t P-
160
P-S
0
UA la
LU
coo
Ance
C44
04 Re
A A A
C4 C4 C4
9
-�-. Z2-
0
--S2
0
EWTP,ANCi5 EXI-M, ARE FbR� 1\41MOTE- L-USF-
+ CA25 R-U5 -DZjv6 'T#P.OU&H
PM
CAle5- />LL/5 DRIVE- 771ROV6-1�(
_4J7
J3
4 ��g
e-AR5 191-v5 ,0,4,e1I(1,v4— role AleW 0,00,t
DKIV4F -rllJeOU&H IPAX4A) Cr FOX
Na r poof�
P4,15 2— 091116-- Mleo V Cyll
5-�
P6 (15 3 PelllC 7-111MV67Y oA)G ooc toy/cH t-,,4-r 4
4 6et v&c k,' 60
on
3_9
e- vj PA 6Y It 0 a cj AL.
rF
0
CONSTRUCTION INC.
13401 Bel -Red Rd., Suite B-4
Belleuve, WA 98005
(206) 641-0722
August 28, 1989
Gordon Hyde
Engineering Coordinator
City of Edmonds
250 5th Ave. N.
Edmonds, Wa. 98020
RE: Joint access on 76th for Grease Monkey and 7-11
Dear Mr Hyde,
Per your request, I have submitted the proposal for a thirty
foot (net) curb cut to be used as a joint access for use by
Grease Monkey and 7-11 to the property owners, Tom
Strickland, and Bob Porterfield, as well as the management
of the 7-11 parcel. As this is a reasonable request and
will allow for safer traffic flow both on and off site, all
the parties concerned agreed to this being a conclition—of
the permit. I am attaching a sketch showing our proposed
placement of the curb cut as you and I have discussed. The
location is described as starting at a point 5 feet south of
the northern most point of the existing easement, and
proceeding south a net distance of thirty feet.
Our agreement to this is also predicated on the existing bus
stop being moved, at no expense to us, to a point not -Tess
than 20 feet south of the new curb cut.
Upon review of our conditional use permit, this common
access is in conflict with condition number 9 of the
decision as issued by the Hearing Examiner. As this change
is in the best interest of The City of Edmonds and the
public safety we are assuming that condition 9 of the C.U.P.
is waived. If this is not the case please inform us by
September 1, 1989.
Sincerely, r
eck VCarlile
cc; Lakeshore Investments
Bob Porterfield
I Commercial Builders
4aXl- C�
015H ) ve fftf
ieH W.,L� /;3N
tL
:L:Ar
LAW
L
rr-
m 00 MY
L
Yl
R",
10)
k�\
--1
F --1 F-71
8
L--I
L-J
IN
I -SLAW
191.-441
tiLL. r"Algluer r_xm-r Kill rtxt,)
*5--U-r
SIT. ISI.W.
�I�SITE P�LAN�
STREET FILE
MERRICK LENTZ ARCHITECT
MAY 15 1989
May 15, 1989 ENGINEERING
Mr. Gordon Hyde
Office of the City Engineer
City of Edmonds
250 5th Ave. N.
Edmonds, WA 98020
RE: Traffic Analysis for Conditional Use Request
Dear Gordon:
This traffic analysis will supplement the information recently
submitted for Conditional Use Permit approval for the property
at the northeast corner of the intersection of 76th Ave. W. and
S.W. 212th Street, currently being considered for development
of the Grease Monkey and Car Wash businesses. Since the ITE
Manual has limited trip generation data for these uses, we have
assembled documentation specifically related to the industry.
The Car Wash data is supported by customer and retail sales in-
formation for approximately 400 self service car wash operators.
The gross income figures, divided by the annual number of cus-
tomers and factored into weekly numbers equals 568 customers
per week. Using ITE daily trip rates, two-thirds of the weekly
number will come on weekdays. Therefore, an average weekday
will account for 152 vehicle trips. The ITE Manual allows a
discount of 25-60% for service retail facilities for passerby
or "drop -by" trips.
Assuming a 40% discount, the average new trips generated -per
weekday is 91. Per ITE standards, approximately 5% of the use
will occur at the PM Peak, resulting in a trip generation of
5 PM Peak trips.
The data for Grease Monkey is based on national data for 150
facilities. Per the attached data sheet, a typical facility
will average 60 customers per day. Since the store is open
15446 seven days per week, the ITE daily trip rate allows the typical
BEL-PEDRD, daily weekday trip count of 49 customers, or 98 vehicle trips,
SUITE 410 to be established. Using the 40% discount as explained above,
REDMOND 59 new customer trips are generated with this use. Three em-
WASHINGTON
98052 ployees will add 6, for a total of 65 new vehicle trips gener-
(206) 881-8117 ated. ITE Manual data supports a 5% PM Peak rate, or three
trips generated during PM Peak.
The development of both uses will therefore result in eight new
PM Peak trips generated. It is also significant to identify the
PM Peak of the existing service station. Using ITE Manual fig-
ures, the existing use generates three PM Peak trips. It is
our opinion that this should be a consideration in determining
the total effect of this development or the traffic patterns.
If you have any further questions or comments, I will be happy
to discuss them with you.
Sincerely,
MER CHI
Merrick D. �e tz, AI
cc: The Greenwood Group
C"w
/Zoe
L. 4 (9. Ob
_AL
nx
J&
14-
LAI A Mfl�
----------
1 -7.
REVISIONS:
1/211=ik-oll
u
4
TO MAJOH ;F3,01L.01-461
Pipe.
ENCIOGURE
:3
L�
4A6 -
I
2
SECTION AT SITE
1 201 -
I'-
i - , T�r;-�t-fo vr- 1, 1 r.-T.
<
Fi�
< �7
\Z V
F-1
Lj\
riu, t�-Xlvpdq- 1:54v� Kill, rov.1)
H,1
L J
\,/A4.LfLjf-)
-ro r_r:-t-,IA4
E P L AN
81— 1
L --I
PROJECT NOTES
01-,,I -r-rPF;-- . v - r-4 �Aeot-j I-1K L-Ff�SD
-S-rA. LL I e A 114
I eo-7 Z '50 - r-T- 6AfL' V4 A-f v- 1 -4
6en-A,*,T gtA (.,-r 10 1 -1 7 F�i . 1?.> - I
WITH If --I pAA�I,,H
1, e 61 A L I P11- 10 r-4 s
P�,�Ce--K
-r�+ ?T�4 Lar:�.- 7 4-2:;- PA- i--'-
E�PE-e,'i erzW L-0-r e;- -rH r-- AL&I
L�OT 7f�> FT -rH �A Ic-" FT I-1/L,
To If--17 L-14 PLIQ 4 2611,92 PT OF KI LO
�OT,ry 7*0> TH W qqA r-,i/L. To I t-4 T L ki
PL kA tt 14, -;> Fr H e9F f:-� L- �,l LOT,�� TH t-J
Zry PT OV.L� TO I [,IT L�,J PLkl 4 122r�� FT 1\1
0 F C-, LW -s P l.-oT T H 1�,A 9 0 -r-T TO VJ 1-0
L-OT EP T�-1 e��, I Zc�) FT TO 64!��f;-' L,—T' fOE>
St? L,0T �':'5 7H 0L��(
1-\I-&j 0 L-W �!,P LOT '?P !2:, FT T4-4 ----,F:L-Y
1-0 1 I-J T S�, L [A LOT e�l AAF 0;� FT SLY OF G4,J
LOT f=T'
e�;� LA
2.000 e>f- (A
�-.>gki 04,e-1p, -r f PTeAl 1-4 To 6-61--1 t-J F--e-j'
wi-r-i le)asrriH&�i
SITE
TH 7 > . F��
4 =,
6 ��ST < sw;;
2 196 ki
ST
VNZ
117 1 -��7"]
J!21-
L SW
M
11A
21,
Rj:�"Ji4�
JUL 1
PERMIT COUNTER
"o
op
R;-
00
co
9
N
04
8
00
01
z
0
z
V)
L ul
Z
0
Lu
LU
D
uj
Lij
rn
'o
A
0
N
0
04
DATE: 7-1':3-51)
DRAWN BY:
SHEET
Al
OF SHEETS
iE COMPLETE LINE/123844
FERGUSON & SONS 120436
z�XAST S M A/
//f/v -Ifz/ 46
04)
q
-k
D1,11,01CVreS Z0C-R71.0,A1 6K1,PZVV
RV11,,94r C(q.A1CRr7,= A911eVrmr
q K
(:;Cr IFORr6 A59SC5 C041AN45
2 9�nfv 0.,pry
m/ 6 gVC6')
JD
.0 .'4 .. 4. , , % 14
0 mdelrml, ALoce,)
: 17-
1'70MP V117Ue� 7-- c 13
ArI44 2 OR COMP4675AIr 12" eoA4vwr_rc1.7 oepxq
Mqrl mz- 4% ma, / Aeo, / 0, a k,)
)9JP11R T COAICA�"TL` 1W111R_LrA1T gFMIZ..
5106-SA A10 SCRe-e
OIL, SEPA��,%T(F;
41r
1__x /s Z 17'Y 7- �IR
1r)? OP
P6rerza/v c4ruvIr ezn<xellre.
mffAfeAlr IvIrIl afwm /0//o Wwm
0 Ar 144le-
70,90%
OeAl
,51ry 1,foDlple�o q�g reSr
Ivo,re . zoc.,Qrr oll AWA/ AS 1A1,01cNre9 (D
40 COAIC96TY W,111<' 3,rCrlo"
1-3
DIPFUSER
HAF7FLE
I
01L
BAWFLE
OU TL E T
--�ILUUUt AtW
EXIS711\16 CUR6
0� 1,570 GALLON CAPACI T f A', 4*-0" WA IP R EIE�
7'- 2'
--Xls 7-11V6 comr vlQ6(- -i FLOW DIFFUSEF
BAFFL-_
^11 . ?A In r1r,9
6
r aV IOZV14,1 19S 1A101C,9r,5,0
'(/o /_'! 5: Z 0 Cq 7L 0
,0,0,C 7_1,A7410 eeAfe.Alr'
e0A1CA;'ere IWWWV67"
hWO044 AIAII.SAI R iv F. D
1H1 3 1931
MAO AWA4
PERMIT COUNTER
...........
40.
SWAIV C1,14
"Oolne:o Aeoc rate re's r
" P
01of1WWr1V7' _9EC7A01V
n,no-rl z7AII-7 ^cA_4.cAj7' I'vwIlIC�ar4' STORMWATER DRAINAGE PLANNOTES
1. ALL SITE WORK MUST COMPLY TO CHAPTER 70 OF THE UNIFORM BUILDING CODE
(1985 EDITION).
THE CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND
SEQUENCES OF CONSTRUCTION AND FOR THE SAFETY OF WORKERS AND OTHERS ON THE
CONSTRUCTION SITE.
3. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROTECT IN -PLACE ALI.
UTILITIES AND/Oil STRUCTURES WHETHER SHOWN OR NOT SHOWN ON THIS PLAN.
DAMAGE DUE TO CONTRACTOR'S OPERATIONS SHALL BE REPAIRED AT THE
CONTRACTOR'S EXPENSE.
4. ALI, CONSTRUCTION SHALL BE IN ACCORDANCE WITH CITY OF EDMONDS STANDARD
SPECIFICATIONS AND WASHINGTON STATE DEPARTMENT OF TRANSPORTATION 1988
STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION.
5. DATUM SHALL BE CITY OF EDMONDS DATUM UNLESS OTHERWISE APPROVED BY THE
11vG1cp1-6,5 �oc/q;r/o/v CITY DEPARTMENT OF PUBLIC WORKS.
6. ALL PIPE SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION ACCORDING TO
WASHINGTON STATE SPEC. 7-02.3(l). THIS SHALL INCLUDE NECESSARY LEVELING
OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL AS WELT AS
SL UDGE WEIR-
JEA7R.9 MR.
VST IN RZ�qCZ-
C619B 17f TRI�
PLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL TO UNIFORM GRADE SO
THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED ON A UNIFORMLY DENSE
UNYIELDING BASE. IF TM NATIVE MATERIAL IN THE BOTTOM OF THE TRENCH
Oil RETENTION
MEETS YHE REQUIREMENTS FOR "GRAVEL BACKFILL FOR PIPE BEDDING" THE FIRST
blo 15C194. c
LIFT OF PIPE BEDDING MAY BE OMITTED PROVIDED THE MATERIAL IN THE BOTTOM
C191-CAl /3/93//41/ 4/0. 2
OV
OF THE TRENCH IS LOOSENED, REGRADED AND COMPACTED TO FORM A DENSE
UNYIELDING BASE. BEDDING FOR RIGID PIPE (CONCRETE AND IRON) SHALL BE
/w :.. :- - CLASS "B" PER APWA STANDARD PLAN NO. B-18c (GRAVEL FROM 4 INCHES BELOW
'!�'XISTIIVG 19SI01,119,1-1- IWV�_ 6-1,17-
VTDT? 7'n CDDTX7rTTXj�
B DDING FOR FLEXIBLE PIPE kCORRUGATED METAL OR
PLASTIC) SHALL BE CLASS "F" PER APWA STANDARD PLAN NO. B-18c (GRAVEL FROM
4 INCHES BELOW PIPE TO 6 INCHES ABOVE PIPE). TRENCH WIDTH SHALL BE 40
INCHES MAXIMUM OR 1-1/2 TIMES PIPE DIAMETER PLUS 18 INCHES, WHICHEVER IS
e
401
_c J-ei
.07-, eJ- v, 7
C191 V /vo. 4
Yl
x7
7 9E
�2'
4Z 3, 0
/A/ V f
All 6RI97 6-
43L
A/6 8 W,9 7_,�SC
F 1
iVv
No T67 - c oA17R,,?c
7'0,,e- SIIAI� L -svW
rIA 16
/VOr-C-' 19�_L V111,0 MROCW910111C S&IRVEY 11Vr01eM,91_10A1 x7s Al,,zk �,Ro/qv 1-wv,-1w6-'vT /,;X/c
L
_Av�� 541R612:-7Y By 7-0 M1?7_C />/7 Co1Wp"9f %
5_-X1,51-1A1G C.45. JI-10WIV 0A1 7/ /5 &9S6 0A1 7 C197CIII 8191%1v A/0. 3 11j01_71F1_cC- /�qOC70XZ T6YF
67(�. � 4275C 149RRO,5 19A10 S-'A17_UC,,"> PROV10,10 8Y 19<
0
(3RR 7z__ 6�. L7 4Z513:9 S7-ORA-1 M91V110�-E
gC6,9R471AIG SUI C V6 _,,;2L L
AlOre: C01VTRI,)CTO,`� /Z //VV E��, 4zo. 65 SW /�'IM 6Z. 422. 72-
12 A' IIVV 41&. 7Z
Tp(lo r,,) !FX1_3711VG oRl(l&�,Wl9y qpKoA15 WITIV
67A IS /�/
-0 M19 IVG gM6,�� �2
1..d, TAI <1 T,?Fr— r Al��
GREATER. BACKFILL SHALL BE PLACED IN 6 INCH LAYERS COMPACTED TO 95%
MAXIMUM DENSITY.
7. ALL STORM DRAIN PIPE SHALL BE CONCRETE RUBBER GASKETED ASTM C-14-2 OR
ASTM C-76-II OR GALVANIZED STEEL OR ALUMINUM CORRUGATED METAL PIPE (PIPE
GAUGES PER CHART BELOW). STEEL OR ALUMINUM PIPE SHALL HAVE WATERTIGHT
CONNECTING BANDS CONFORMING TO THE REQUIREMENTS OF APWA SPECIFICATIONS
qRCTTON 9-09-4(7)- qTF.F.T. PTPF ,HAT.I. RP.r.FTVP. TRP.ATMF.MT I M;PITAT.T r.nATTNr.'
14 5411 30" TO 36"
12 60" TO 66" 42" TO 54"
10 72" 60" TO 72"
8 78" TO 96" 78" TO 8/4"
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - -- - - - - - - -
3 INCH BY I INCH CORRUGATIONS
MINIMUM GALVANIZED ALUMINUM
GAUGE STEEL
16 36" TO 102" 30" TO 60"
8. ALL BUILDING DOWNSPOUTS AND FOOTING DR.AINS SHALL BE CONNECTED TO THE
STORM DRAINAGE SYSTEM, UNLESS OTHERWISE APPROVED BY THE DEPARTMENT.
9. EXISTING UTILITIES INDICATED ON THE DRAWING HAVE BEEN PLOTTED FROM THE
BEST INFORMATION AVAILABLE TO THE ENGINEERS. UNDER NO CIRCUMSTANCES WILL
ERRORS OR OMISSIONS IN LOCATION OF UTILITIES OR IMPROVEMENTS BE
CONSIDERED AS A BASIS FOR EXTRA OR ADDITIONAL COMPENSATION TO THE
CONTRACTOR.
10. THE STORM DRAINAGE SYSTEM SHALL BE CONSTRUCTED ACCORDING TO THE APPROVED
PLANS WHICH ARE ON FILE IN THE DEPARTMENT OF PUBLIC WORKS CENTRAL
RECORDS. ANY DEVIATION FROM THE APPROVED PLANS WILL REQUIRE WRITTEN
APPROVAL FROM THE PROPER AGENCY, CURRENTLY THE CITY OF EDMONDS DEPARTMENT
OF PUBLIC WORKS.
A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER
CONSTRUCTION IS IN PROGRESS.
11. UTILITY PIPE SPECIFICATIONS:
a <
T�-
DO
WN
U)
CE
0
LLi
_j
r
>-
LLJ
LIU
U)
>
X
U)
grimy's
<
I
C-6
C\i
cy)
U)
a
CD
LIJ
Lu
Lu
z
0
o
7
U)
LLJ
<
LLJ
_j
>
LIJ
>
I
cl:
0
z
c:)
CD
�.j
z
0
V)
cr.
0
z
ACCEPTABLE MATERIALS FOR THE FOOTING DRAIN PIPE AND FITTINGS ARE:
PERFORATED CORRUGATED POLYETHYLENE DRAINAGE TUBING, AND SHALL MEET OR
EXCEED ALI, REQUIREMENTS OF ASTM F-405 (HEAVY DUTY), OR POLYVINYL CHLORIDE
(PVC) PIPE SHALL MEET OR EXCEED ALL REQUIREMENTS OF ASTM 2729.
ACCEPTABIF MATERIALS FORTHE ROOF DRAINPIPE AND FITTINGS ARE:
PVC D3034, SUR 35 OR CONCRETE RUBBER GASKETED ASTM C-14 CL. 11. so
12. CONTRACTOR TO REPLACE ALL PUBLIC AND PRIVATE IMPROVEMENTS IN CONDITION
EQUALTO THAT WHICH EXISTED PRIOR TO CONSTRUCTION. CONSTRUCTION AREA TO
BE FINE GRADED UPON COMPLETION IN UNIMPROVED AREAS. !:A-
13. ALL WATER AND/OR CONSTRUCTION DFBRLS SHALL BE REMOVED FROM NEW SEWERS AND
SHALL NOT BE PERMITTED TO ENTER THE EXISTING SYSTEM. �j
14 . ALL STRUCTURAL FILLS SHALL BE COMPACTED TO A MINIMUM OF 95AZ OF MAXIMUM
DENSITY BY MODIFIED PROCTOR TEST.
15. PROVIDE AND MALNTAIN TEMPORARY SEDIMENTATION COLLECTION FACILITIES TO Jkj
INSURE SEDIMENT LADEN WATER DOES NOT ENTER THE NATURAL DRAINAGE SYSTEM. Qk
THE FACILITIES MUST BE IN OPERATION PRIOR TO CLEARING OR OTHER
CONSTRUCTION AND BE MAINTAINED UNTIL CONSTRUCTION AND LANDSCAPING ARE
POTENTIAL FOR ON -SITE EROSION HAS PASSED. AS CONSTRUCTION
COMPLETED AND
PROGRESSES AND EXPECTED (SEASONAL) CONDITIONS DICTATE, MORE
SILTATION
CONTROL FACILITIES MAY BE REQUIRED TO INSURE COMPLETE SILTATION CONTROL
ON THE PROPOSED PLAT. THEREFORE, DURING THE COURSE OF CONSTRUCTION, IT
SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE DEVELOPER TO ADDRESS
ANY NEW CONDITIONS THAT MAY BE CREATED BY HIS ACTIVITIES AND TO PROVIDE
ADDITIONAL FACILITIES, OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE
NEFIDED TO PROTECT ADJACENT PROPERTIES.
16. 7HE BACKFILL SHALL BE PLACED EQUALLY ON BOTH SIDES OF THE PIPE IN LAYERS
OF SIX INCHES,
WITH A LOOSE AVERAGE DEPTH MAXIMUM DEPTH EIGHT INCHES, :,Z
THOROUGHLY TAMPING EACH LAYER. THESE COMPACTED LAYERS MUST EXTEND FOR
ONE PIPE DIAMETER ON EACH SIDE OF THE PIPE OR TO SIDE OF THE TRENCH.
MATERIALS TO COMPLETE THE FILL OVER PIPE SHALL BE THE SAME AS DESCRIBED.
17. SIDE SLOPES SHALL BE CONSTRUCTED NO STEEPER THAN 2 HORIZONTAL TO 1
VERTICAL OR OTHERWISE STATED BY SECTIONS AND NOTES ON THE DRAWINGS. NJ
18. WHERE NEW PAVING MUST MATCH EXISTING PAVING, APPLY TACK COAT FOR PROPER
SEALING.
DRAWN BY CHECKED BY
Col\IAI��-C_T /-o .-_X1_5711VG 57_01?1vf
1-10,,Q1Z0A1719L
(d
R10k 7-0 "Y SCALE DATE
RIM 417- i�'� py f
12 11 IAIV. i, 6�. 7 4A918 9
E6671VI7
7-
12 08 NO
S roRm OR1191111, 6: = 3,71 0/,
I __ I T-1 I -
04 , 15
MUING �t � -11
67?1_0 HIVU uVz'- p4RN
E"'I /s T11vc, 5"s. /
11vvr-11t,�):: 417. or,
�/7) �zl&q3
Alo 0 o C,94 67
SHELT OF
MUM ImUld
1�1
ga, Yh
C41- W,4sq ;752
011-eA� -76
jUL 13 1931
HIUAIT COUNTFR
il
/&V �tzl
Id
If
11 F60/7
ON
,6,v c1ie16w,6
6,9,r
40 P
A 4
o
OR
Afaellledplvck")
r
A URI, q� T C01VC9,z 7L
.ee- c A 1,:i lllvb\,,,_ gsPI�U A,9vF/vleA/r-,";` A �_
j
Ice
5106-SA
OIL/ WATER SEPA;�-ATnn
117141- /ry r ou
5,78-
l'- 2"
1o4g,qr-4w,o c4rAf4FAlr exv"e,,re: 1,107F., zoonr 0// Rzv/v "95
MffW-e&r W17XI EAt-om /0//0 WWAJ
10-01C rZAA147 IfAf
e, OA/,r
-Okt-f LFre w,06+-- IA11.51,1
7r
�d
141
ov.
IPWAf'
c�"cr meae,,aw 7o.90% A...
04FA451rY 1lrR Afoacle,0 - 1%TCJ70R_ 7ZrSr
locMe om A## & INDIewreo
amsay
40 60AICACTY W41k--** 960ROAl omocrde resr
"5W66 Aql1eV6,V7- joeCrloM ..
3
FLOW DIFFUSER OIL RETENTION
BAFFLE BAFFLE
4
111LET -
OUTLET
� PORM9NO CEMEA17- Co1V<TR67-6-
C1957 //(/ ARC6
A5,011,91-T '10,�q1.--4f6Vr
0
SLUDGE WEIR
VL
V -X15 r11\16 ef�lx�6
L
oe
01
7'-2-
CXIS 7'11V6 FLOW DIFFUSER 1,570 GALLON CAPACITY AT 4'-0" WATER LEVEL 6
BAFFLE 11vc1,fq;r6L5 zocgrlolv
OAI 101-191v.
014 - W.4 Mg
v SLUDGE WEIR SEPPRR rat
a 6"
OIL RETENTION
BAFFLE A 0-,-LC- ;WX
-11VG /9 //,7/ CA7 7-c /4/ A/0 scI9467
C1, IS 7 V 1319JIAI
1W 51W,
izo) x
0 //V V 30
//Vv
Al <65� " Z 3' 41
,2, '/ L5 /,�j
Tr/ J
111VIV L
Rz-ocRa wv 11 1111"
L oligill 1 r
Ilia
5 /v
EAlr
-Y,
k
4
,v) /K 17
4Z!5,,
01Z A1,9r,
1o1VWMLzA1
4- 51feV5,971 W,5 S110XIAl
rOA
1A/V '4� 1;
L
rp v co.
2 -SoX,
<21 11VV -!!5Z, 40 3,75(�l
"17
Ry sewe"_-
'5,0�V17"p
RIM 5�� -4
.0 A
INV ce. 4251 6
7 /0 L
00
IIVV C-,� - 422. 0
'o
50
/16
46e1VC11 MARI'-
Clr>-' AgW76M
r�.o 01,11alV4 /0
?7
4
N,
;v.v.
A10A5.- 7,Ve C
7-OR L
4�0 14 3e KI 0/4"
RCA4 k F_ 6-A Sr AIC, AlKe
C- 19J1W19,'_7_ 191V471" COAICR677",5 61, 0
k
Al <6,9*
9 "IC- RK -02,1(�' /91-1- R4,VA17,FeS
rl �71 7,4Z 70 A,16w cue6 z-11ve (mew oe_,4qvr45-p_
V/ Ue-7
IC�� t!S7
— --------- cI-- 21
m9TER m ET64-1
ITT
S/oxav
Wv
STORMWATER DRAINAGE PLAN NOTES
1. ALL SITE WORK MUST COMPLY TO CHAPTER 70 OF 7HE UNIFORM BUILDING CODE
(1985 EDITION).
2. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND
SEQUENCES OF CONSTRUCTION AND FOR THE SAFETY OF WORKERS AND OTHERS ON THE
CONSTRUCTION SITE.
3. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROTECT IN -PLACE ALL
UTILITIES AND/OR STRUCTURES WHETHER SHOWN OR NOT SHOWN ON THIS PLAN.
DAMAGE DUE TO CONTRACTOR'S OPERATIONS SHALL BE REPAIRED AT THE
CONTRACTOR'S EXPENSE.
4. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH CITY OF EDMONDS STANDARD
SPECIFICATIONS AND WASHINGTON STATE DEPARTMENT OF TRANSPORTATION 1988
STANDARD SPECIFICATIONS FOR -ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION.
5. DATUM SHALL BE CITY OF EDMONDS DATUM UNLESS OTHERWISE APPROVED BY THE
CITY DEPARTMENT OF PUBLIC WORKS.
6. ALL PIPE SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION ACCORDING TO
WASHINGTON STATE SPEC. 7-02.3(1). THIS SHALL INCLUDE NECESSARY LEVELING
OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL AS WELL AS.
PLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL TO UNIFORM
THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED ON A UNIFORM GRADE SO
UNYIELDING BASE. LY DENSE
IF THE NATIVE MATERIAL IN THE BOTTOM OF THE TRENCH
MEETS THE REQUIREMENTS FOR "GRAVEL BACKFILL FOR PIPE BEDDING" THE FIRST
LIFT OF PIPE BEDDING MAY BE OMITTED PROVIDED THE MATERIAL IN THE BOTTOM
OF THE TRENCH IS LOOSENED, REGRADED AND COMPACTED TO FORM A DENSE
UNYIELDING BASE. BEDDING FOR RIGID PIPE (CONCRETE AND IRON) SHALL BE
CLASS "B" PER APWA STANDARD PLAN NO. B-18c (GRAVEL FROM 4 INCHES BELOW
PIPE TO SPRINGLINE), BEDDING FOR FLEXIBLE PIPE (CORRUGATED METAL OR
PLASTIC) SHALL,BE CLASS"F" PER APWA STANDARD PLAN NO. B-18C (GRAVEL FROM
4 INCHES BELOW PIPE TO 6 INCHES, ABOVE PIPE). TRENCH WIDTH SHALL BE 40
INCHES MAXIMUM OR 1-1/2 TIMES PIPE DIAMETER PLUS 18 INCHES, WHICHEVER IS
GREATER. BACKFILL SHALL BE PLACED IN 6 INCH LAYERS COMPACTED TO 95%
MAXIMUM DENSITY.
7. ALL STORM DRAIN PIPE SHALL BE CONCRETE RUBBER GASKETED ASTM C-14-2 OR
ASTM C-76-II OR GALVANIZED STEEL OR ALUMINUM CORRUGATED METAL PIPE (PIPE
GAUGES PER CHART BELOW). STEEL OR ALUMINUM PIPE SHALL HAVE WATERTIGHT
CONNECTING BANDS CONFORMING TO THE REQUIREMENTS OF APWA SPECIFICATIONS
SECTION 9-05.4(7). STEEL PIPE SHALL RECEIVE TREATMENT I ASPHALT COATING
INSIDE AND OUTSIDE, OR BETTER, UNLESS NOTED.
---------------------------------------------------------------
2-2/3 INCH BY 1/2 INCH (NOMINAL) CORRUGATIONS
----------- w ----------------------------------------------------
MINIMUM GALVANIZED ALUMINUM
GAUGE STEEL
16 8" TO 4811 8" TO 2711
14 5411 30" TO 3611
12 60" TO 6611 42" TO 5411
10 721# 60" TO 72"
8 78" T096" 78" TO 8411
-----------------------------
3 INCH BY I INCH CORRUGATIONS
MINIMUM GALVANIZED ALUMINUM
GAUGE STEEL
16
36" TO 102" 30" TO 6011
ALL BUILDING DOWNSPOUTS AND FOOTING DRAINS SHALL BE CONNECTED TO THE
STORM DRAINAGE SYSTEM, UNLESS OTHERWISE APPROVED BY THE DEPARTMENT.
9. EXISTING UTILITIES
INDICATED ON THE DRAWING HAVE BEEN PLOTTED FROM THE
BEST INFORMATION AVAILABLE TO THE ENGINEERS. UNDER NO CIRCUMSTANCES WILL
ERRORS OR OMISSIONS IN LOCATION OF UTILITIES OR IMPROVEMENTS BE
CONSIDERED AS A BASIS FOR EXTRA OR ADDITIONAL COMPENSATION TO THE
CONTRACTOR.
10.,.,THE STORM DRAINAGE SYSTEM-SHAL BE CONSTRUCTED ACCORDING TO THE APPROVED
PLANS WHICH ARE ON FILE IN THE DEPARTMENT OF PUBLIC WORKS CENTRAL
RECORDS. ANY DEVIATION FROM THE APPROVED PLANS WILL REQUIRE WRITTEN
APPROVAL FROM THE PROPER AGENCY, CURRENTLY THE CITY OF EDMONDS DEPARTMENT
OF%-,UBLIC WORKS.
A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER
CONSTRUCTION IS IN PROGRESS.
t
0
0
c
<
z
0
0.
z
a, rr
0
_j
*own
m
U)
lomm
X
cx�
U)
cr
LLJ
Lu
Lij
Z
00
at
Lli
>
cr
U
A%O&
0�
C -1
ullLlix PIPE SPECIFICATIONS:
ACCEPiABLE 'MATERIALS FOR THE FOOTING DRAIN PIPE AND FITTINGS ARE:
PERFORATED CORRUGATED POLYETHYLENE DRAINAGE TUBING, AND SHALL MEET OR
EXCEED ALL REQUIREMENTS OF ASTM F-405 (HEAVY DUTY), OR POLYVINYL CHLORIDE
(PVC) PIPE SHALL MEET OR EXCEED ALL REQUIREMENTS OF ASTM 2729.
ACCEPTABLE MATERIALS FOR THE ROOF DRAIN PIPE AND FITTINGS ARE:
PVC D3034, SDR 35 OR CONCRETE RUBBER GASKETED ASTM C-14 CL. II. so
12.� cbNTRACTOR TO REPLACE ALL PUBLIC AND PRIVATE IMPROVEMENTS IN CONDITION 44
EQUAL TO THAT WHICH EXISTED PRIOR TO CONSTRUCTION. CONSTRUCTION AREA TO
BE FINE GRADED UPON COMPLETION IN UNIMPROVED AREAS.
13. ALL WATER AND/OR CONSTRUCTION DEBRIS SHALL BE REMOVED FROM NEW SEWERS AND
SHALL NOT BE PERMITTED TO ENTER THE EXISTING SYSTEM.
14. ALL STRUCTURAL FILLS
SHALL BE COMPACTED TO A MINIMUM OF 95% OF MAXIMUM
DENSITY BY MODIFIED PROCTOR TEST. C
15. PROVIDE AND MAINTAIN TEMPORARY SEDIMENTATION COLLECTION FACILITIES TO t4i
INSURE SEDIMENT LADEN WATER DOES NOT ENTER THE NATURAL DRAINAGE SYSTEM.
THE FACILITIES MUST BE IN OPERATION PRIOR TO CLEARING OR OTHER
CONSTRUCTION AND BE MAINTAINED UNTIL CONSTRUCTION AND LANDSCAPING ARE
COMPLETED AND POTENTIAL FOR ON -SITE EROSION HAS PASSED. AS CONSTRUCTION
PROGRESSES AND EXPECTED (SEASONAL) CONDITIONS DICTATE) MORE SILTATION
CONTROL FACILITIES MAY BE REQUIRED TO INSURE COMPLETE SILTATION CONTROL
ON THE PROPOSED PLAT. THEREFORE, DURING THE COURSE OF CONSTRUCTION, IT
SHALL BE THE OBLIGATION Zk
AND RESPONSIBILITY OF THE DEVELOPER TO ADDRESS
ANY NEW CONDITIONS THAT MAY BE CREATED BY HIS ACTIVITIES AND TO PROVIDE
ADDITIONAL FACILITIES, OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE
NEFDED TO PROTECT ADJACENT PROPERTIES.
16. 7HE BACKFILL SHALL BE PLACED EQUALLY ON BOTH SIDES OF THE PIPE IN LAYERS
WITH A LOOSE AVERAGE DEPTH OF SIX INCHES, MAXIMUM DEPTH EIGHT INCHES,
THOROUGHLY TAMPING EACH LAYER. THESE COMPACTED LAYERS MUST EXTEND FOR
ONE PIPE DIAMETER ON EACH SIDE OR TO SIDE OF THE TRENCH.
OF THE PIPE
MATERIALS TO COMPLETE THE FILL OVERPIPE SHALL BE THE SAME AS DESCRIBED.
9%
17. SIDE SLOPES SHALL BE CONSTRUCTED NO STEEPER THAN 2 HORIZONTAL TO 1
VERTICAL OR OTHERWISE STATED BY SECTIONS AND NOTES ON THE DRAWINGS.
t
18. WHERE NEW PAVING MUST MATCH EXISTING PAVING, APPLY TACK COAT FOR PROPER
SEALING.
C(9AIM,5��T 70 -XIS71AIG SMi-Al DRAWN 13Y CHIE CKLD BY LL.
PRIOR 70 "Y
COIVVAIKICTIOA,� R11W 64.= 417. SCALE OATE
/p 3�� /11 If Lu
I % (ox / a'- ID'I A � y , . = 'n / It-14—
OIL - W197�4_714Z
4OL5110WAI
IVS
-INV
12 " 11V V EZ 419- 7�1)
6,9S1,A1 Alo. 4
/A/ V, 4 1,9. 0
//orc.- "941 �� I . —1
5X1,97-1A1C,, - l6oelmome Y 19A10 7*CR0&fRP111C SeIR V6- y IAIZ�MA-f,9710AI No-L-.. c0A1TR,9C70,o4Z
C. /5. 5,410WAI 0A1 117S RIC'mov(5 C/97c//
G1':;Zlq76 =7 -5z275L-, 7/ IS 'PeIVIV IS A59SIFO 0/v 7-1,�� &y
RRR0,ff 19AIZ7 �9&�OC.,.F6�9rr,6,- (2197CII 6/q%/V A/0. 3 t-Z/,57 �f , 5, rwo ,;tk rRol-70
', JA14 > PRO Vloeo By 0WA1,-,e__ OV�7SMOAIS TY106� / 70 VFMCA17 IlOW
Alordr; CO3,V7R,900R Slllq�L REC-19,CCIA16 SUR V6Y Cq-7 r2 Glq��qTE =-Z. co/vip"91f 7- -
7095%
7-kvo (2) 6XIVIA16 LIRI(IeW,91y lqol�IoAIS W1711
12 11VV !F�, 420. 6 5 -
C61R6 4,eWl'&A� �O MN7cX1 6,VIS&V�3 S70RA4 MogNmol-E
W RIM
12 A' VV
N4 lk
41&. 72
01)
r7 S 7 Rel: 7- S, W
A.
w
76-r'4AW�: W-
NS
FERGUSON & SONS 120436
4-- X /L5r Ls. 19 M A/
/x/v 421 .0,6
�j
Z3
uu
Z
4`11NV6Z. =4Z_,5.20
i
5q�
U/
I_j
43
.10
0
,01-4 OR V0MPer46&,r
71yer. .. e
17 ICD11171
/ 1. c// vcnt: / c i.
E 5 7*11V6
/- -X /3 \7 AYR1-b7U P,9V,--1VLc1\1r4'
,o-R.�-movLz" =x1,5r11v6 eap-6
CX1,Sr11'16 COAIC KIQ4L
-'XIS 7//VG 19MIV194 7- 1`RVcM,-A17_
o
2
4
le 4CaWA9Cr4F,0 47,rOrM
('.95 % h y A (a q /I Ileo I fi v
IIIACACAIT 94C7AI�
5106-SA NO S(:Ri
OIL/ WATER SEPARATOR
071-Z oy VNz11_ r
490UM.
5'- 8"'
FLOW DIFFUSER T- 2"
BAFFLE I
p4wr44mo cemfmr aawxere:
"ProelfIr m1r& afoom " 7f 6 IV /0//0 ;Vwm
AWAY&
ON,)
c')
/00 JPWA-f
J1
70 90 VS
,0eA1.$1rY AFR ROO-01e,0 MX�,"-7 44VAnr S4 QA 110 CIZ 4 0c.
A0rur: IOC47e ON P401 WS 11VD1CNrF0
AeocrdA res r
4f' COAICA6�rcc. PVqll<' 3Z:C' r10A Aqt1drAfeN7- JSCrIO,41
//0 _1cwe (D Z
1.05C,0440
co
FLOW DIFFUSER
Q�rrlr -
HILET
OIL RETENTION
.—I �
OUTLET
1.570 GALLON CAPACITY AT 4'-0' WATER LEVEL
014 - W Mg
SLUDGE MIR �- ;2 SEPPR*9 rok
OIL RETENTION 4_7F M11-
BAFFLE
V
C1?7_(CA1 13,9J11V Ajo - 2
7 -) -R,,F - - Y
6�TN 7-6- -1-, = 426, 60
12' 1"V -42 1.30
/"v V
eAf
PZV,41 �9,Y IAIOIC�9reo 0
/ M/0 e-eAfFVr
BROOM
170RrzN1VG ^6M6,A17 601V<?A�rL-_
STORMWATER DRAINAGE PLAN NOTES
ALL SITE WORK MUST COMPLY TO CHAPTER 70 OF THE UNIFORM BUILDING CODE
A
N
(1985 EDITION).
2.
THE CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND
c\J
SEQUENCES OF CONSTRUCTION AND FOR THE SAFETY OF WORKERS AND OTHERS ON THE
4.
46"W4 T 10Wj1,zM&Vr
CONSTRUCTION SITE.
<
cl,
3.
IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROTECT IN -PLACE ALL
UTILITIES AND/OR STRUCTURES WHETHER SHOWN OR NOT SHOWN ON THIS PLAN.
DAMAGE DUE TO CONTRACTOR' S OPERATIONS SHALL BE REPAIRED AT THE
CONTRACTOR'S EXPENSE.
CO 6
4.
ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH CITY OF EDMONDS
(3 >-
<
Lu
N
STANDARD
LIJ
U)
SPECIFICATIONS AND WASHINGTON STATE DEPARTMENT OF TRANSPORTATION 1988
STANDARD SPECIFICATIONS FOR
Z >
ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION.
cc
5.
DATUM SHALL BE CITY OF EDMONDS DATUM UNLESS OTHERWISE APPROVED BY THE
D
u)
CITY DEPARTMENT OF PUBLICWORKS.
01V 04191v.
6. ALL PIPE SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION ACCORDING TO
U
n
"zi-
WASHINGTON STATE SPEC. 7-02.3(l). THIS SHALL INCLUDE NECESSARY LEVELING
<
OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL AS WELL AS
- D-f T)
PLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL TO UNIFORM GRADE SO
THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED ON A UNIFORMLY DENSE
_j
06
a
UNYIELDING BASE. IF THE NATIVE MATERIAL IN THE BOTTOM OF THE TRENCH
(1)
(0
NO
MEETS THE REQUIREMENTS FOR "GRAVEL BACKFILL FOR PIPE BEDDING" THE FIRST
GE"
CD
15C1941c
LIFT OF PIPE BEDDING MAY BE OMITTED PROVIDED THE MATERIAL IN THE BOTTOM
OF THE TRENCH IS LOOSENED, REGRADED AND COMPACTED TO FORM A DENSE
LIJ
UNYIELDING BASE.
All
BEDDING FOR RIGID PIPE (CONCRETE AND IRON) SHALL BE
CLASS "B" PER APWA STANDARD PLAN NO. B-18c (GRAVEL FROM 4 INCHES BELOW
Roo,-- aRRIAl
4Z3,
_e.=4Z
/14/V CZ,
e**7
4AP I x I
It AMAIA�ry
-
�' R?.
. � �. _!_ __
4'-*11A1V 6 3.
7REAIC-1-1 Z)9,911V 11V V e4 42.4-3 7
47.=,c 0A7/'1A/z 7,,gr,- 7 0/ e7A
12 TH
11VVrm4) = 4/7 00 4?Y' 0
/W(1,0�/V �93.
01
IS - W
/A46-T6�C
FIFE 10 SPRINGLINE). BEDDING FOR FLEXIBLE PIPE (CORRUGATED METAL OR
u
PLASTIC) SHALL BE CLASS 'IF" PER APWA STANDARD PLAN NO. B-18c (GRAVEL FROM
0
7
U)
4 INCHES BELOW PIPE TO 6 INCHES ABOVE PIPE). TRENCH WIDTH SHALL BE 40
tij
<
INCHES MAXIMUM OR 1-1/2 TIMES PIPE DIAMETER PLUS 18 INCHES, WHICHEVER IS
uj
GREATER. BACKFILL SHALL BE PLACED IN 6 INCH LAYERS COMPACTED TO 95%
_j
LIj
>
MAXIMUM DENSITY.
>
<
X(-)
cr-
7. ALL STORM DRAIN PIPE SHALL BE CONCRETE RUBBER GASKETED ASTM C-14-2 OR
(n
0
z
ASTM C-76-II OR GALVANIZED STEEL OR ALUMINUM CORRUGATED METAL PIPE (PIPE
M
GAUGES PER CHART BELOW). STEEL OR ALUMINUM PIPE SHALL HAVE WATERTIGHT
CONNECTING BANDS CONFORMING TO THE REQUIREMENTS OF APWA SPECIFICATIONS
m
0
CD
SECTION 9-05.4(7). STEEL PIPE SHALL RECEIVE TREATMENT I ASPHALT COATING
c\j
toi.
INSIDE AND OUTSIDE, OR BETTER, UNLESS NOTED.
6
------------------
2-2/3
--------------------------------------------
INCH BY 1/2 INCH (NOMINAL)
CORRUGATIONS
---------------------------------------------------------------
MINIMUM
GALVANIZED
ALUMINUM
GAUGE
STEEL
16
8" TO 4811
8" TO 2711
CITY OF EDMONDS
14
5411
30" TO 3611
12
60" T066"
42" TO 54"
WATER DEPARTMENT
10
72"
60" To 72"
8
78" TO 96"
78" TO 84"
Iter review If% potential heftIth hwrds, insialmmill . 1. 1 t
---------------------------------------------------------------
O\ is approved on condition the following Water SySam 3 INCH BY I INCH CORRUGATIONS
'1� protedion is provided: ---------------------------------------------------------------
MINIMUM GALVANIZED ALUMINUM
NONE GAUGE STEEL
AIR - GAP
APPROVED REDUCED PRESWRE 16 36" TO 102" 30" TO 60"
PRINCIPLE DEVICE
W"MED DOUKE CHWK VXV4 8. ALL BUILDING DOWNSPOUTS AND FOOTING DRAINS SHALL BE CONNECTED TO THE
USEMY STORM DRAINAGE SYSTEM, UNLESS OTHERWISE APPROVED BY THE DEPARTMENT.
OTHER z
0
_qj0(z_?j Qt5Al_MQ_ 9. EXISTING UTILITIES INDICATED ON THE DRAWING HAVE BEEN PLOTTED FROM THE >
w
BEST INFORMATION AVAILABLE TO THE ENGINEERS. UNDER NO CIRCUMSTANCES WILL cr
ERRORS OR OMISSIONS IN LOCATION OF UTILITIES OR IMPROVEMENTS BE
CONSIDERED AS A BASIS FOR EXTRA OR ADDITIONAL COMPENSATION TO THE
CONTRACTOR. .
10. THE STORM DRAINAGE SYSTEM SHALL BE CONSTRUCTED ACCORDING TO THE APPROVED
PLANS WHICH ARE ON FILE IN THE DEPARTMENT OF PUBLIC WORKS CENTRAL
RECORDS. ANY DEVIATION FROM THE APPROVED PLANS WILL REQUIRE WRITTEN
APPROVAL FROM THE PROPER AGENCY, CURRENTLY THE CITY OF EDMONDS DEPARTMENT
OF PUBLIC WORKS.
A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER
CONSTRUCTIONIS IN PROGRESS.
11. UTILITY PIPE SPECIFICATIONS:
ACCEPTABLE MATERIALS FOR THE FOOTING DRAIN PIPE AND FITTINGS ARE:
PERFORATED CORRUGATED POLYETHYLENE DRAINAGE TUBING, AND SHALL MEET OR
EXCEED ALL REQUIREMENTS OF ASTM F-405 (HEAVY DUTY), OR POLYVINYL CHLORIDE
(PVC) PIPE SHALL MEET OR EXCEED ALL REQUIREMENTS OF ASTM 2729. COO)
>%j - 55
cr 1<
ACCEPTABI E MATERIALS FOR THE ROOF DRAIN PIPE AND FITTINGS ARE: so
PVC D3034, SDR 35 OR CONCRETE RUBBER GASKETED ASTH C-14 CL. II.
1-14
12. CONTRACTOR TO REPLACE ALL PUBLIC AND PRIVATE IMPROVEMENTS IN CONDITION -
EQUAL TO THAT WHICH EXISTED PRIOR TO CONSTRUCTION. CONSTRUCTION AREA TO "Z
BE FINE GRADED UPON COMPLETION IN UNIMPROVED AREAS. 04
/vo. 4 13. ALL WATER AND/OR CONSTRUCTION DEBRIS SHALL BE REMOVED FROM NEW SEWERS AND
SHALL NOT BE PERMITTED TO ENTER THE EXISTING SYSTEM.
7-YP6
14. ALL STRUCTURAL FILLS SHALL BE COMPACTED TO A MINIMUM OF 95% OF MAXIMUM
12 /A/ V, �5Z 41,9. 0 DENSITY BY MODIFIED PROCTOR TEST.
15. PROVIDE AND MAINTAIN TEMPORARY SEDIMENTATION COLLECTION FACILITIES TO
INSURE SEDIMENT LADEN WATER DOES NOT ENTER THE NATURAL DRAINAGE SYSTEM.
THE FACILITIES MUST BE IN OPERATION PRIOR TO CLEARING OR OTHER
CONSTRUCTION AND BE MAINTAINED UNTIL CONSTRUCTION AND LANDSCAPING ARE
COMPLETED AND POTENTIAL FOR ON -SITE EROSION HAS PASSED. AS CONSTRUCTION
PROGRESSES AND EXPECTED (SEASONAL) CONDITIONS DICTATE, MORE SILTATION
CONTROL FACILITIES MAY BE REQUIRED TO INSURE COMPLETE SILTATION CONTROL
ON THE PROPOSED PLAT. THEREFORE, DURING THE COURSE OF CONSTRUCTION, IT
SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE DEVELOPER TO ADDRESS
ANY NEW CONDITIONS THAT MAY BE CREATED BY HIS ACTIVITIES AND TO PROVIDE
ADDITIONAL FACILITIES, OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE ktj
NEFDED TO PROTECT ADJACENT PROPERTIES.
16. IRE BACKFILL SHALL BE PLACED EQUALLY ON BOTH SIDES OF THE PIPE IN LAYERS
WITH A LOOSE AVERAGE DEPTH OF SIX INCHES, MAXIMUM DEPTH EIGHT INCHES,
THOROUGHLY TAMPING EACH LAYER. THESE COMPACTED LAYERS MUST EXTEND FOR
ONE PIPE DIAMETER ON EACH SIDE OF THE OR TO SIDE OF THE TRENCH.
PIPE
Notr67.- coAoRgc7-ne w, MATERIALS TO COMPLETE THE FILL OVER PIPE SHALL BE THE SAME AS DESCRIBED.
em
7- /�%//_7
17. SIDE SLOPES SHALL BE CONSTRUCTED NO STEEPER THAN 2 HORIZONTAL TO I
/?6�0ZIW6- 70 M/9TC//7 C01WP"9(fT 7'0 95% VERTICAL OR OTHERWISE STATED BY SECTIONS ANDNOTES ON THE DRAWINGS.
OR/Vf M191VIIME /-Y/12F -Y-46 /119� 18. WHERE NEW PAVING MUST MATCH EXISTING PAVING, APPLY TACK COAT FOR PROPER
57 1), SEALING. DRAWN BY CHECKEM'
AV/w 7a 1. .1 -7o, qlf g
12 A' 1,AIV �E7L, 41&. 7Z c ollm&�� 7 -Xl-5TIIVG 570
1w191V1)A0z67,(K�,f1FY /YO,';�/ZOA/T
Mt)
,e1(9R 70 AIVY SCALE: DATE
6 IVV_Rll�lm� RIM 6z = 417
(9 if/ go /0 ZIZ918 Y
12" IAIV. 6Z. = 410,97 wo
1�58 �_,F 12 If0A1(_-RE7,-_ 1211
JOB NO,
sroRm 'CR1911\1, S = 3,71 0/,:, 99
157.75 /V0 7 7'0 �7c,9499
ET OF
1 r_
9 1 F
Owwe Ansol-ey
6*klvok- ;76215--.2,z 5r5-,111
011-EAY 211ZI Va lftttl
:511-e a,7l-z-lry ,
in
ED
(3
20 L
A----
2AA I L P I �J 64'51,
SECTION AT -SITE
t ax I �;; T)
FOR
ME
PA HP TF-9
7
>
'T
A F gAle* M 04 MY
4
r
A
14 A
� P-L
CIA
P,
L
E3
L L J
L --I
VA&A Q M
<
70
o-5T.
-SITE PLAN
Yj -Z r,>�
I
PROJECT-NOTES-
-e�& Fr. Vr�-H l6oL.-M f:i,.UiP MAlWTPt4AWeX-,
__04�AAPM&T -Tyfr=e-2-. 'AL4-ro 45rozVlez. a-1
OIL i�TO A6tr.- +Z
6tRAc)g*)
Q6t fzat2u I 'STALLoe,
f�WX4 f Fitpo. 1/&00 o2. 5
Pp 'Sl
H Re,. ALL le!� 11
107 2- l5a r-T. edAg W As-44
1.7 `5oTAlLcV,
PA It r-J w em rgov I pao eo 'S-TALL,-;;p - rROVI Pfao
W I tH, I W WAevH a4:Y-�,-
1, adjA L. PT 1 ois4
-rT L-a f+ajdj
HT9:�p
P-0&-
PTI-4 Lor4.P 7 +9!p PAF
-rH A LeM Sp L_t4ry
aol!Upl �vw C-401t LaT 95.
L-OT 7 tg> 101-i FT TH 0 1 ctv PT'm/ I
TQ.lW7 L44 PLkl 4 Vol-112 FT 15 C:Fl W ILA
-7*e;, TH W q9A rl/L- TO� IWT LW
?Lkl 14 - 5 fr ),I 6F f_: Lt,�l LOT g> TH 1,4
z5 PT mIL. -reo it -IT LW - PLW 4 12S FT tJ
OF ev -Ul i5PP L-OT TH W - 90 r-T TO W LO
LOT e:P TH dSp 12 r-�? f:T,,TO. -514 _wit L&:Pr fOE!P.
L�E*G, ae-M 'GVJ 6OFt -5-P L-OT� S 7H 0 UY
IaLy
PT M4,
AL&j PA L-0 ::PL? LOTA?P
L4T LO," AAP 9!:� FT SLY OF e-*J
T0__ I WT IS, LN
BaAfrj We-i rfzaeipr�L4 We --iO*O PevF
I Tf.: L�) RA i W 4..e� ., *5 1 T a ' PFZAl N TO 415HW�45:�T
IT H,
siny,
)MPLETE LINE/123844
FERGUSON & SONS 120436
,57x11sr 19, 15 M.
/x/v
�Aj
N,
N
141A[71CQrr,5 1009710,Al 6KI
A3
'94wgzr 'CoAlcRe7aw '0,911'em'-wr
R66AC6,976& 4W.7-6 Will /
2
7
40 A-
-4 4 eoAfpqerca
F r&y, 6V AfIV1,0rA&70' R-Oreor)
oll OR 00AfP46;l
A? CaWA-74rW
A UPWR T COVVCA�-TF
,-,-,x1s;7r11"v6\" AS101-1,1�'Z7 P,9V&-1V61Vr-,"l
_4�6'XISTIIV6
Ly
Rii- sx/sr//vc, a/.l
�0
C1?eAf0VF 6XISrIM6 CoAln
g
MEN oil 11 1 11 �iw- ihRmill
5106-SA Ivo Sil
OIL/ WATER SEPARATOR
4/M 17Y vvu_ r 4�g 6r ou m
5'- 8
I V- 2"
FLOW DIFFUSER
BAFFLE
WASHINGTON STATE SPEC. 7-02.3(1). THIS SHALL INCLUDE NECESSARY LEVELING
OF THE TRENCH BOTTOM OR THE TOP 'OF THE FOUNDATION MATERIAL AS WELL AS
0/1. - W.9 Mg PLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL TO UNIFORM GRADE SO
0,1CAOr2 A* AD 1r^0
SLUDGE WEIR z_11.,o0?17c77- IAI 0/z?AC /V/R.Q n.1-7f7ll
THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED ON A UNIFORMLY DENSE
OIL RETENTION UNYIELDING BASE. IF THE NATIVE MATERIAL IN THE BOTTOM OF THE TRENCH
BAFFLE aF MAL MEETS THE REQUIREMENTS FOR "GRAVEL BACKFILL FOR PIPE BEDDING" THE FIRST
A/0 SCR6 67 LIFT OF PIPE BEDDING MAY BE OMITTED PROVIDED THE MATERIAL IN THE BOTTOM
OF THE TRENCH IS LOOSENED, REGRADED AND COMPACTED TO FORM A DENSE
C197-Cl-I 0/9j//v A/0. 2 UNYIELDING BASE. BEDDING FOR RIGID PIPE (CONCRETE AND IRON) SHALL BE
TYI-16- ff - 481 0 CLASS "B" PER APWA STANDARD PLAN NO. B-18c (GRAVEL FROM 4 INCHES BELOW
7t -L. = 426. 60
12' //Vv &,�. �421-30
/,A/V
Iv
Z 3 41 " E
99,/-
,motguwAg cemwr emr,,ill
0WffW4l AIM& SOZA4 714" /0//0 ;Vwm
AINISAI
4"
Y'w AAA /O.A/Z 4.
r meaea-e m .90
,0e&,5177Y IVoill AfODIoill /%Zr� reSr
Ao,re rzocill ow pw As ImIcNreo 0
40 enAlcI76r67 wwt SinerloAll
3
4l It
Zo"Ire CW
& x & /00 *WAf
FLOW DIFFUSER OIL RETENTION
BAFFLE BAFFLE ,
HALET
't-:717
OUTLET
"401AAW Aeocrill
AMeNfN7 56Crlo,41 Mo
------- ---
"/%I&/ SIORMWATER DRAINAGE PLAN NOTES
/,A/ PjRC&
1. ALL SITE WORK MUST COMPLY TO CHAPTER 70 OF THE UNIFORM BUILDING CODE
(1985 EDITION).
2. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND
SEQUENCES OF CONSTRUCTION AND FOR THE SAFETY OF WORKERS AND OTHERS ON THE
7,56V194 T CONSTRUCTION SITE.
3. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROTECT IN -PLACE ALL
UTILITIES AND/OR, STRUCTURES WHETHER SHOWN OR NOT SHOWN ON THIS PLAN.
DAMAGE DUE TO CONTRACTOR'S OPERATIONS SHALL BE REPAIRED AT THE
CONTRACTOR'S EXPENSE.
4. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH CITY OF EDMONDS STANDARD
SPECIFICATIONS AND WASHINGTON STATE DEPARTMENT -OF TRANSPORTATION 1988
STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION.
1,570 GALLON CAPACITY AT 4'-0- WATER LEVEL 6 5. DATUM SHALL BE CITY OF EDMONDS DATUM UNLESS OTHERWISE APPROVED BY THE
CITY DEPARTMENT OF PUBLIC WORKS.
-5 IM0101976S ZOCR)ii
0A1 /0/-19/V. 6. ALL PIPE SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION ACCORDING TO
%1i
ROO,c- ORRIAl
MENCAl DRAIN IAIV et = 4Z4,37
SEC ,9RVW17,-C7-�Y PI-RAI
R F L-rZ
00/-- C71e)VIV
//VV 1!Fz. = .1;rZ3,
... ... ....
4"
�777777�777 77-7;
W19TEe m ET64Z
cl,
�A ill
oell-WIV6. 19
CRTC11 819,VIV A10. 3
TY10,- /
6RRrE
/Z // IAIV E6, - 42o. 6 5
STR65 r
Rtc*1K9 V5 C)MCAl ONSIAl
eXI5;r f "s.
�919TE =Z. = 4-94. 00
VI))
, , Y. W
A�
Q
I '--:
PIPE TO SPRINGLINE). BEDDING FOR FLEXIBLE PIPE (CORRUGATED METAL OR
PLASTIC) SHALL BE CLASS "F11 PER APWA STANDARD PLAN NO. B-18c (GRAVEL FROM
4 INCHES BELOW PIPE TO 6 INCHES ABrVE PIPE). TRENCH WIDTH SHALL BE 40
INCHES MAXIMUM OR 1-1/2 TIMES PIPE I)LAMETER PLUS 18 INCHES, WHICHEVER IS
GREATER. BACKPILL SHALL BE PLACED IN 6 INCH LAYERS COMPACTED TO 95Z
MAXIMUM DENSITY.
7. ALL STORM DRAIN PIPE SHALL BE CONCRETE RUBBER GASKETED ASTM C-14-2 OR
ASTM C-76-Il OR GALVANIZED STEEL OR ALUMINUM N CORRUGATED METAL PIPE (PIPE
GAUGES PER CHART BELOW). STEEL OR ALUMINUM PIPE SHALL HAVE WATERTIGHT
CONNECTING BANDS CONFORMING TO THE REQUIREMENTS OF APWA SPECIFICATIONS
SECTION 9-05.4(7). STEEL PIPE $HAL RECEIVE TREATMENT 1 ASPHALT COATING
(0/ INSIDE AND OUTSIDE, OR BETTER, UNLESS NOTED.
---------------------------------------------------------------
2-2/3 INCH BY 1/2 INCH (NOMINAL) CORRUGATIONS
------------------------------------------ 7 ---------------------
MINIMUM GALVANIZED ALUMINUM
'.AUGE STEEL
16 80' TO 48" 8" TO 2711
14 5411 ', 30" TO 3611
12 6011 TO 66" 42" TO 5411
10 7.2" 60" TO 72"
8 71l 96" 78" TO 8411
----------------------------------------------------------------
3 INCH BY 1 INCH CORRUGATIONS
-------------------------- 7 ------------------------------------
MINIMUM GALVANIZED ALUMINUM
GAUGE STEEL
16 36" TO 102" 30" TO 60"
8. ALL BUILDING DOWNSPOUTS AND FOOTING DRAINS SHALL BE CONNECTED TO THE
STORM DRAINAGE SYSTEM, UNLESS. OTHERWISE APPROVED BY THE DEPARTMENT.
9. EXISTING UTILITIES INDICATED ON THE DRAWING HAVE BEEN PLOTTED FROM THE
BEST INFORMATION AVAILABLE TO THE ENGINEERS. UNDER NO CIRCUMSTANCES WILL
ERRORS OR OMISSIONS IN LOCATION OF UTILITIES OR IMPROVEMENTS BE
CONSIDERED AS A BASIS FOR EXTRA OR ADDITIONAL COMPENSATION TO THE
CONTRACTOR.
10. THE STORM DRAINAGE SYSTEM SHALL BE CONSTRUCTED ACCORDING TO THE APPROVED
PLANS WHICH ARE ON FILE IN THE DEPARTMENT OF PUBLIC WORKS CENTRAL
RECORDS. ANY DEVIATION FROM THE APPROVED PLANS WILL REQUIRE WRITTEN
APPROVAL FROM THE PROPERAGENCY, CURRENTLY THE CITY OF EDMONDS DEPARTMENT
OF PUBLIC WORKS,
A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER
CONSTRUCTION IS IN PROGRESS.
b
0
11.
UTILITY PIPE SPECIFICATIONS:
ACCEPTABLE MATERIALS FOR THE FOOTING DRAIN PIPE AND FITTINGS ARE:
PERFORATED CORRUGATED POLYETHYLENE DRAINAGE TUBING, AND SHALL MEET OR
EXCEED ALL REQUIREMENTS OF ASTM F-405 (HEAVY DUTY), OR POLYVINYL CHLORIDE
(PVC) PIPE SHALL MEET OR EXCEED ALL REQUIREMENTS OF ASTM 2729.
OIL - M1197-ZW
s,EE 40
ACCEPTABLE MATERIALS FOR THE ROOF
R//11 /,Vj
DRAIN PIPE AND FITTINGS ARE:
-3110WAI
PVC D3034, SDR 35 OR CONCRETE RUBBER GASKETED ASTH C-14 CL. II.
12" INV 6-L, = 4/L3, F rl�q)
12 " IAIV EZ. = .41,6.8 roull)
12.
CONTRACTOR TO REPLACE ALL PUBLIC AND PRIVATE IMPROVEMENTS IN CONDITION
EQUAL TO THAT WHICH EXISTED PRIOR TO CONSTRUCTION. CONSTRUCTION AREA TO
BE FIRE GRADED UPON COMPLETION IN UNIMPROVED AREAS.
319SIAl /vo. 4
13.
ALL WATER AND/OR CONSTRUCTION DEBRIS SHALL BE REMOVED FROM NEW SEWERS AND
TY10,-_ /
SHALL NOT BE PERMITTED TO ENTER THE EXISTING SYSTEM.
6R19T6 lez. =: 40,31 0
14'.
ALL STRUCTURAL FILLS SHALL BE COMPACTED TO A MINIMUM OF 95% OF MAXIMUM
c
//v v Ir-z 41 0
DENSITY BY MODIFIED PROCTOR TEST.
A
15. PROVIDE AND MAINTAIN TEMPORARY SEDIMENTATION COLLECTION FACILITIES TO
INSURE SEDIMENT LADEN WATER DOES NOT ENTER THE NATURAL DRAINAGE SYSTEM.
THE FACILITIES MUST BE IN OPERATION PRIOR TO CLEARING OR OTHER
CONSTRUCTION AND BE MAINTAINED UNTIL CONSTRUCTION AND LANDSCAPING ARE
COMPLETED AND POTENTIAL FOR ON -SITE EROSION HAS PASSED. AS CONSTRUCTION
PROGRESSES AND EXPECTED (SEASONAL) CONDITIONS DICTATE, MORE SILTATION
CONTROL FACILITIES MAY BE REQUIRED TO INSURE COMPLETE SILTATION CONTROL
ON THE PROPOSED PLAT. THEREFORE, DURING THE COURSE OF CONSTRUCTION, IT
SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE DEVELOPER TO ADDRESS
ANY NEW CONDITIONS THAT MAY BE CREATED BY HIS ACTIVITIES AND TO PROVIDE
ADDITIONAL FACILITIES, OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE
NEEDED TO PROTECT ADJACENT PROPERTIES.
16. THE BACKFILL $HALL BE PLACED EQUALLY ON BOTH SIDES OF THE PIPE IN LAYERS
WITH A LOOSE AVERAGE DEPTH OF SIX INCHES, MAXIMUM DEPTH EIGHT INCHES
w
THOROUGHLY TAMPING EACH LAYER. THESE COMPACTED LAYERS MUST EXTEND FOR
ONE PIPE DIAMETER ON EACH SIDE OF THE PIPE OR TO SIDE OF THE TRENCH.
NOT67 - coA17RIvc MATERIALS TO COMPLETE THE FILL OVER PIPE SHALL BE THE SAME AS DESCRIBED.
TOR- sh"qu CUT" c
wllzk j!:�RO/_,7,07 PVVEMCAIT /01A9
17. SIDE SLOPES SHALL BE CONSTRUCTED NO STEEPER THAN 2 HORIZONTAL TO 1
Q� 1'0mqrc1-1, colvflowc7- 7-o VERTICAL OR OTHERWISE STATED BY SECTIONS AND NOTES ON'THE DRAWINGS.
18. WHERE NEW PAVING MUST MATCH EXISTING PAVING, APPLY TACK COAT FOR PROPER
S70RAI 111191VII01-E 7YIQF mm
.7 SEALING. ORA
422. 72-
tk::� COIVA16 -C,7- 70 6k1_5r11VG 5;r(WM
12 ' 11VV 41&. 7Z
A4191VI101_67,(W�71flFY ,YOR/ZOA/7�Z
-OV119P 7-0 OAIY "Nam
0
00
Z <
WN _j
0 r
(!))- LU
LIJ U)
Z >
viiiiiiiiiiM CE
3 :D
U)
n
3: cii
—till U)
go cr
Lli
Q Lu
Lu Z
0 Z w
cc LU <
U_j
WN > >
X <
cr
z
0
c\J
cy)
c\J
cy)
0
0
,JD
z
0
m
0
z
z (,) SCALE: DATE
417, pl /0 Ir
12 " IAIV. 6*,,_', = 410, 9 7 J", 1 �IZ918 Y
158 4,F - 12 1211
--A / �, JOB NO,
Z 4-4 (;�WV
EXISTIA16 5.,5 M.1-1 a1J7-11V5? 6q)"i to
oo llvvrllv) =- 417. oo 4-11VIS11 6glq'i 4
IIVV(,�04_17,) -:g/&, �13
ii SrORM 47RI1911\1 7 S. = 3. 71 ol, s
157.75 ,V0 7 7o 1�c,94 og
SHEET OF
FERGUSON& SONS 120436
�Aj
(D
R d4)
I koo
I
16.
t
2 ,,,, e
CPS%,
AO a,.prq
C>
f4
&
A?" e4WA70lF47
A144 12MMAEA
OR C
17WIlm -r
t-clly(.-ncic 1`H'Vc1YZt1V1 UtIlIX
5106-SA
OIL/ WATER SEPARATOR
ASAH,�'U A,90E-M,5A1r-"' &Az /,ry r .,�lz
�-X/smvr, alez 4
i-ReIVOOF 6XIS r11116 comn
00.
C,A�v
eXISTIN6 ASR,09,�;-
goo,C L7Rp1,V
4111INV67z. =4z5-l?oi OR,91,4,1
-4"'IAIV 6-Z = 425.,?
5-8
�j
PO
A,
,o4r.f r4amo cemewreawXVIF
MprWrWr IVIrW BRX04 7/`61 v ea , /0 AO W W A4
10/1VAYA/
o., mewre wwcA
44f
i
i��=r "sarwe 70-90%
Aq
,FAI517-y IVR Ajvaorle�o j%n�� rezir
A0A.r: 10CM6 oll A01 AS IMOICNreO 0
x1w..t ginerloAl,
3
FLOW DIFFUSER OIL RETENTION 4
BAFFLE BAFFLE
A
cy
'3- OUTLET
Lj
�ov 1,570 GALLON CAPACITY AT 4'-0" WATER LEVEL 0 11V0101976,5 ZOICRrION CITY DEPARTMENT OF PUBLIC WORKS. nrrLxvvrLi DL .1 L LIZ U)
FLOW DIFFUSER T-2"
BAFFLE o" 104191v. 6. ALL PIPE SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION ACCORDING TO
WASHINGTON STATE SPEC. 7-02.30). THIS SHALL INCLUDE NECESSARY LEVELING
014 - Wig Mg OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL AS WELL AS
PLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL TO UNIFORM GRADE SO
SLUDGE IR - 00 jorl 0 1* Mlp /-to /)�? cl 7- 1A 0/fl,--07A* /111RA nc Tfl//
,VOr,5'-* ZOW76- CW P4,VN ,,95 1A,40Vo9,reo 0
j0i9,e7Z,Q,V,g , e,--AfFWr-
e0hlcxere MffAf6Ar.
LWOOM AIMISq
7.
61 x MAO *WA4
*`I%4Al,0 CIZI_
0
212 r/4"
�ET
1 '4<1
\%c.
11
Mo -3c&lr z
pogmq/vo Csmemr STORMWATER DRAINAGE PLAN NOTES
1. ALL SITE WORK MUST COMPLY TO CHAPTER 70 OF THE UNIFORM BUILDING CODE
(1985 EDITION).
2. THE , CONTRACTOR IS SOLELY RESPONSIBLE FOR THE c\j
MEANS , METHODS AND CD
SEQUENCES OF CONSTRUCTION AND FOR THE SAFETY OF WORKERS AND OTHERS ON THE
CONSTRUCTION SITE. 00
3. IT SHALL BE THE CONTRACTORIS RESPONSIBILITY TO PROTECT IN -PLACE ALL z <
UTILITIES AND/OR STRUCTURES WHETHER SHOWN OR NOT SHOWN ON THIS PLAN. U) Ld
DAMAGE DUE TO CONTRACTOR'S OPERATIONS SHALL BE REPAIRED AT THE rr
CONTRACTOR'S EXPENSE.
0 <
>- Ui
4. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH CITY OF EDMONDS STANDARD W w
SPECIFICATIONS AND WASHINGTON STATE DEPARTMENT OF TRANSPORTATION 1988 Z >
STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION.
5. DATUM SHALL BE CITY OF EDMONDS DATUM ITNIESS gruvwxrov
THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED ON A UNIFORMLY DENSE J6 o6 cy)
OIL RE ENT)ON owl1c. rogg UNYIELDING BASE. IF THE NATIVE MATERIAL IN THE BOTTOM OF THE TRENCH a
BAFFLE MEETS !HE REQUIREMENTS FOR "GRAVEL BACKFILL FOR PIPE BEDDING" THE FIRST C/) 0
No scl`9� 67 LIFT OF PIPE BEDDING MAY BE OMITTED PROVIDED THE MATERIAL IN THE BOTTOM Ir 2Y
OF THE TRENCH IS LOOSENED, REGRADED AND COMPACTED TO FORM A DENSE Lu
C19 7C A/ 1319ilAl A/0. 2 UNYIELDING BASE. BEDDING FOR RIGID PIPE (CONCRETE AND IRON) SHALL BE Lu
All CLASS "B" PER APWA STANDARD PLAN NO. B�-18c (GRAVEL FROM 4 INCHES BELOW z
6�TI9767 42&. &0 PIPE TO SPRINGLINE). BEDDING FOR FLEXIBLE PIPE (CORRUGATED METAL OR ui (D
12 " //V V EL -4,9 /- 30 PLASTIC) SHALL BE CIASS#'Ffl PER APWA STANDARD PLAN NO. B-18c (GRAVEL FROM Z U)
4" IAIV t-z. 4 INCHES BELOW PIPE TO 6 INCHES ABOVE PIPE). TRENCH WIDTH SHALL BE 40 0 LJJ <
INCHES MAXIMUM OR 1-1/2 TIMES PIPE DIAMETER PLUS 18 INCHES, WHICHEVER IS cc Lli
GREATER. BACKFILL SHALL BE PLACED IN 6 INCH LAYERS COMPACTED TO 95% uj
MAXIMUM DENSITY. >
/99, 1.4
A./ 159 11 z 3 41 ZF 3: CE
0 (A 0
7. ALL STORM DRAIN PIPE SHALL BE CONCRETE RUBBER GASKETED ASTH C-14-2 OR z
ASTM C-76-II OR GALVANIZED STEEL OR ALUMINUM CORRUGATED METAL PIPE (PIPE
GAUGES PER CHART BELOW). STEEL OR ALUMINUM PIPE SHALL HAVE WATERTIGHT
CONNECTING BANDS CONFORMING TO THE REQUIREMENTS OF APWA SPECIFICATIONS C)
�j (D
900,oc- OR,91AI N,�. 4-
4'l1A1VR-;f4l3.1 7R-6AIC/1 D9,91N IAIV 6Z - = 424-4 7
SEC VRC1117FC7-S RZAA1
5. tc. F. I Also
6k/sT//vr> CuRle C111T
1910Rlo1v
C197CII 819J11V A10, 3
TY10,5 /
GRR rE c-l� , = 4eg. -20
12 1'/ //Vv 154, = 420. 6 5
s TREI: r
0011c- ORIOV1111
/,vv cz. = 42,3,
IV
2 W19TEle m ET621
,,17
OV
"c'/W 5,
n /,5 2' f,
V0� i
,
14/
R,
N
S�
3
0\
16 8" TO 48" 8" TO 2711
%Nil
I
m
14 5411 30" TO 3611
12 6011 TO 6611 4211 TO 54"
10 7211 60" TO 7211
8 78" TO 96" 78" TO 8411
------------------------------ --------------------------------
ul
I
7
3 INCH BY I INCH CORRUGATIONS
---------------------------------------------------------------
MINIMUM GALVANIZED ALUMINUM
GAUGE STEEL
16 36" TO 102" 30" TO 60"
8. ALL BUILDING DOWNSPOUTS AND FOOTING DRAINS SHALL BE CONNECTED TO THE
STORM DRAINAGE SYSTEM, UNLESS OTHERWISE APPROVED BY THE DEPARTMENT.
z
9
9. EXISTING UTILITIES INDICATED ON THE DRAWING HAVE BEEN PLOTTED FROM THE
BEST INFORMATION AVAILABLE TO THE ENGINEERS. UNDER NO CIRCUMSTANCES WILL
w
ERRORS OR OMISSIONS IN LOCATION OF UTILITIES OR IMPROVEMENTS BE
CONSIDERED AS A BASIS FOR EXTRA OR ADDITIONAL COMPENSATION TO THE
CONTRACTOR.
10. THE STORM DRAINAGE SYSTEM SHALL BE CONSTRUCTED ACCORDING TO THE APPROVED
PLANS WHICH ARE ON FILE IN THE DEPARTMENT OF PUBLIC WORKS CENTRAL
RECORDS. ANY DEVIATION FROM THE APPROVED PLANS WILL REQUIRE WRITTEN
APPROVAL FROM THE PROPER AGENCY, CURRENTLY THE CITY OF EDMONDS DEPARTMENT
OF PUBLIC WORKS.
A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER
CONSTRUCTION IS IN PROGRESS.
11. UTILITY PIPE SPECIFICATIONS:
ACCEPTABLE M RIALS FORTHE FOOTING DRAINPIPE AND FITTINGS ARE
PERFORATED CORRUGATED POLYETHYLENE DRAINAGE TUBING, AND SHALL MEET OR
EXCEED ALL REQUIREMENTS OF ASTM F-405 (HEAVY DUTY), OR POLYVINYL CHLORIDE
OAL - M1197-!�� _5,ff1019j-W)-0k (PVC) PIPE SHALL MEET OREXCEED ALL REQUIREMENTS OF ASTM 2729. lZ
SEE- LL--7191L 40 ACCEPTABIE MATERIALS FOR THE ROOF DRAIN PIPE AND FITTINGS ARE:
R1111 !�-& 1,;75 S//ow/v PVC D3034, SDR 35 OR CONCRETE RUBBER GASKETED ASTM C-14 CL. II. so
/?-// INV 418. F rl-"2) 12. CONTRACTOR TO REPLACE ALL PUBLIC AND PRIVATE IMPROVEMENTS IN CONDITION
12"11VV El_ .418.8 (oul -4
EQUAL TO THAT WHICH EXISTED PRIOR TO CONSTRUCTION. CONSTRUCTION AREATO
BE FINE GRADED UPON COMPLETION IN UNIMPROVED AREAS.
519SIAl Alo. 4 13. ALL WATER AND/ORCONSTRUCTION DEBRIS SHALLBE REMOVED FROMNEWSEWERS AND
7 YRE SHALL NOT BE PERMITTED TO ENTER THE EXISTING SYSTEM.
i.;Z
6RgTe Ez. 14. ALL STRUCTURAL FILLS SHALL BE COMPACTED TO A MINIMUM OF 95% OF MAXIMUM
DENSITY BY MODIFIED PROCTOR TEST.
15. PROVIDE AND MAINTAIN TEMPORARY SEDIMENTATION COLLECTION FACILITIES TO
INSURE SEDIMENT LADEN WATER DOES NOT ENTER THE NATURAL DRAINAGE SYSTEM.
THE FACILITIES MUST BE IN OPERATION PRIOR TO CLEARING OR OTHER
CONSTRUCTION AND BE MAINTAINED UNTIL CONSTRUCTION AND LANDSCAPING ARE
COMPLETED AND POTENTIAL FOR ON -SITE EROSION HAS PASSED. AS CONSTRUCTION
PROGRESSES AND EXPECTED (SEASONAL) CONDITIONS DICTATE, MORE SILTATION
CONTROL FACILITIES MAY BE REQUIRED TO INSURE COMPLETE SILTAtION CONTROL
ON THE PROPOSED PLAT. THEREFORE, DURING THE COURSE OF CONSTRUCTION, IT
SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE DEVELOPER TO ADDRESS
CREATED BY HIS ACTIVITIES AND TO PROVIDE
ANY NEW CONDITIONS THAT MAY BE
ADDITIONAL FACILITIES, OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE
NEEDED TO PROTECT ADJACENT PROPERTIES.
16. IHE BACKFILL SHALL BE PLACED EQUALLY ON BOTH SIDES OF THE PIPE IN LAYERS
r
WITH A LOOSE AVERAGE DEPTH OF SIX INCHES, MAXIMUM DEPTH EIGHT INCHES,
THOROUGHLY -TAMPING EACH LAYER. THESE % —
COMPACTED LAYERS MUST EXTEND FOR tE
ONE PIPE DIAMETER ON EACH SIDE OF THE PIPE OR TO SIDE OF THE TRENCH.
NOTF.- CovTRqCro,,C SA�RZ�
lls,9w CUT" 14ATERIALS TO COMPLETE THE FILL OVER PIPE SHALL BE THE SAME AS DESCRIBED.
!-RoRg pq 17. SIDE SLOPES'SHALL BE CONSTRUCTED NO STEEPER THAN 2 HORIZONTAL TO 1
VIFAICAIT /ovo VERTICAL OR OTHERWISE STATED BY SECTIONS AND NOTES ON'THE DRAWINGS.
M,,9rcIl co/-1/0/9�f 7- 7-0 .9:5 % 1�5
ps/c M01_71FI6�g ;�C7-0,4_- reZ-7-.
IS 7_09AI M191VII01- E 7YI`�F 717— 18. WHERE NEW PAVING MUST MATCH EXISTING PAVING, APPLY TACK COAT FOR PROPER
1), SEALING. DRAWN BY: CHECKED BY'
/';�'/A-f 6 -102. 7?_
12 IV 1,AIV 6�, = 41&. 79 CONA16-CT 70 &XI,571A/� 57ORM
`2,67G
m1l91v11o1_IE_p(Vt--R1Fy HOR/ZOA/7,Z
jeV,--1e71e,9e_ ARIOR 7-0 AVY SCALE: DATE
6 OA /3 7 R-41C M OA, � RIA 4 cc/_ 4 / 7, 1
12 " 1AIV. -�Z. = 410.9 7 / -*1 /0
1�58 Z-,F - 12 "' 6(')A 1CRE76- 31�1 '_Pl/
JOB NO.
SrORM 47RI911\1 7 S = 3.71 0/0 s. Lo/
15',7 .75 lVo 7 ;ro �C,9449 oz —
SHEET OF
FA ��/