Loading...
21313 76TH AVE W.PDF111111 lill 11 6326 21313 76TH AVE W 7 c90 /K CITY OF EDMONDS J �&_w 8 9 0 - 19" Address of Construction 01 13/3 - /!� __ /3- Property Legal Description (include all easements): SIDE SEWER PERMIT PERMIT N? 8867 AA BALLINGER LIFT STATION RECKIVED JUN 3 01997 UBLIG WORKS DEpl__. Owner and/or C t t 1 V IV / f J / CA-,) k I I I I r (A-IL-4 V f State License N', o5? _;00 — Bu ng ermit No. V C3 Si. gle Family 14asion into City Right -of -Way: El No A Yes Multi -Family (No. of Units RWC&nstruction Permit No.' Commercial Cross other Privaite Property:k No El Yes El Public Attach legal description and'copy of recorded easement I,ee'rt)y t-hat I have read a ,p�ha comp y itv rel ments iis-ip(dicated on the bacX'olt thetmit Card. Date CALL DIAL -A -DIG (1-800-424-5555) BEFORE ANY tXCAVATION OFFICE USE -ONLY FOR INSPECTION CALL"M-4,M .,,PUB,LI.0 WORKS DEPT. 60-00 7771,0,;�� Permit Fee: Issued By TrunkCharge: 3GO-oo Date Issued: Assessment Fe 92,Z-. Z-0 Receipt No.: 0 Lid No.:— P-4 6, M r-10 I w s P r o G rz #4 >_t Partial Inspection: Ii"'i TAP 6/10/97 1 0 NN. "7J2A7 Date —Initial Comments Reason Rejected: Date —Initial — Final Inspection Approved: Date I n itial ZIL PERMIT MUST BE POSTED ON.JOB SITE White Copy: File Green Copy; inspector Buff Copy: Applicant Revised 3/90 H The City of Edmonds Side Sewer Drawing EASEMENT NO . .................... ....................... NEW CONSTRUCTION E] REPAIRS F-1 LID NO . .................. . ASMT. NO . .................. OWNER ...... Gq�4.A!0.�,f ..... CArst ........................ CONTRACTOR .................................................................................... PERMIT NO. .. 4.7. JOB ADDRESS .... LEGAL DESCRIPTION: LOT NO . ........................................ BLOCK NO . .................................... .. ... . ... ... ... . .. .... .. ..... .. ..... .. ... CID r, 7�- - - - - ---- ............................................................... ..................................... ----------------- ----------------------- NAME OF ADDITION .......................................................... j .... --- -------- I cl 40 Lev tc/0) 6 D t, 19. 0 r- j 3 Approved: c /0 4--j to SN V, 0 t On stj 4= (. PV c t.'w a F Cvrb4a 41-4 j te PWW-0001-11/75(REV.11/78) DATE At-1 ............. B y 40� ----------------------------- NOTICE: No warranty of accuracy. The information shown on the attached map(s) was compiled for use by the City of Edmonds, its Employees and Consultants. The City of Edmonds does not warrant the accuracy of anything set forth on these map(s). Any person or entity requesting a copy should conduct an in dependent inquiry regarding the information shown on the map(s), including, but not limited to, the location of any sewer stub shown. Such sewer stubs may or may not exist and may or may not exist at the location shown. Neither the City of Edmonds nor its employees or officers shall be liable for the information given on this map(s), nor for any one representation provided based upon said map(s). The City of Edmonds Water Service Drawing EASEMENT NO . ............................................ NEW CONSTRUCTION REPAIRS'Fl LID NO . .................. . ASMT. NO . .................. OWNER ........... ......................... CONTRACTOR ..... .... C,.oNsT... PERMIT NO. 7-3.4 c 01 3-7 3 4 3 JOB ADDRESS .................................... ... LEGAL DESCRIPTION: LOTNO . ...................................... BLOCK NO . .............. 5.77-0. .4.1 ................................................ : .................................................................................................................. 2.1-sv3-7(orK 97, 34(, 12: a$ spuce 9- i A WS NAMEOF ADDITION ..: ................................................................................................................... 8.5, 1/2."C-OppeR I 2"SUPERA-CM I.P.S.—PE.- IGO PS-1. ,,j/-r;tA,MeP_ wlaf- %V3 17 7 (6 -r 2." P. S 2'.*F- up.Aa5 f COPMOZ I 3 1 r—1 . I Approved: PASMAO-'s 9/12/P7 ........... ... . .. ...... PWW-0,001-1 1175 (REV.1 1178) DATE Sx.r.-PT 15,A9.91. By MJL-10�/ ............ uj :r I- 11111111111111 15185 21313 76TH AVE W �'77 :13 C. Isq'-1 City �f Edmonds RIGHT-OF-WAY'CONSTRUCTION PERMIT Permit Number. Lssue Date: 4 - 26-!2 > A. Address or Vicinity of Construction: - '2-4:?) 11 5"- -7 L tA h a L B. Type o f Work (be specific): -_,� 7--7 uL),r it - 4n jl�--; 0 0 n Q &Q e-.& ij 0 A—) C . Contractor: --2.^ *h AJ I C, < 01 I)f:, 7—Contact: j p k (V 17_-A 0 r!) X A) I Cd'17T� Mailing Address: P,() ]�QK 669 Irbi"40bghone: 4o e)') - 43o State License #: 7's db Liability Insurance: Bond: $ D. Building Permit # (if applicable): Side Sewer Permit # (if applicable): E. Commercial Subdivision E] City Project Utility (PUD, GTE, WNG, CABLE, WATER) Multi -Family Single Farmily Other INSPECTOR: INSPECTOR: F. Pavement or Concrete, Cut Yes E]No G. Size of Cut: x 10 H. Chargq�,$ APPLICANT TO READ AND SIGN INDEMNITY. Applicant understands and by his signature to this application to hold the City of Edmonds harmlessfrom injuries, damages, or claims ofany kind or description ivhatsoever, foreseen or unforeseen, that may be made against the City of Edmonds, or any of its departments or employees, including or not. limited to the defense of any legal proceedings including defense costs and attorneyfees by reason of granting this permit. THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL INSPEC- TION AND ACCEPTANCE OF THE WORK. ESTIMATED RESTORATION FEES WILL BE HELD UNTIL THE FINAL STREETPATCHIS COMPLETED BY CITY FORCES, AT WHICH TIME A DEBIT OR CREDIT WILL BE PROCESSED FOR ISSUANCE TO TfiEAPPLICANT Two sets of construction drawings of proposed work required with permit application. Ir (ft W II I A 24 hour notice is required for inspection. Please call the Engineering Division, 771-0220. Work and material is to be inspected during,progress and at completion. JUN 2 7 1997 Restoration is to be in accordance with City Codes. ENGINEERIN'-.- Street shall be kept clean at all times. Traffic Control and Public Safety shall be in accordance with City regulations as required by the City Engineer. All street cut trench -work shal I be patched with asphalt or City approved material prior to the end of the working day; NO EXCEPTIONS. - I have read the above statements an derstand the permit requirements and the pink copy of the permit will be ��un available on site r ins ec 2)n purposes. A;P'all timesfo Signature: , _/�7, Date: CA='77cr-c-ont actor or Ag_e_n77-""--_______ IAL-A-DIG PRIOR TO BEGINNING WORK FOR CITY USE ONLY APPROVED BY: RIGHT OF WAY FEE: TIME AUTHORIZED: VOID AFTER DAYS DISRUPTION FEE]FUND I 11: RESTORATION FEE- -7 SPECIAL CONDITIONS: a K d W" 1.9 C, T OTAL FEE: RECEIPT NO.: ISSUED.BY_: da I a .3—V WV NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE Eng: Div 1997 FIELD INSPECTION NOTES (Fund 111 Route copy to Street Dept.) Comments: Diagram CONTRACTOR CALLED FOR INSPECTION Partial Work Inspection by P.W.: Work Disapproved By: FINAL APPROVAL BY: El YES Date: Date: El NO r-'7 -?rW (1,CIZ -- I'V ;�� 3ev u 26 I O-P —t-w 0 d gy V c f Qty�'.bf Edmonds -RIGHT-OF-WAY CONSTRUCTION PERMIT Permit Number. 9-Y Wue Date: 7 A. 'Address or Vicinity of Construction: 943/1 I&A A&E U/ B. Type of Work' (be specific): A16 112 C. Isoci or— PVC-- I M IZW NEW ARAMMEAIr (302" C. Contractor: Contact Mailing Address: _4M YAqw —.crj Phone: State License #: jelaA Liability Insurance: Bond: $ . D. Building Permit #(if applicable): S ide Sewer Permit # (if applicable): E. F-1 Commercial E] Subdivisi6n E] City Project E] Utility (PUD, GTE, WNG(,CA13LV WATER) F1 Multi -Family El Single Family Other INSPECTOR: INSPECTOR: F. Pavement or Concrete Cut: E]Yes �_No G. SizeofCut: _41' x Hi, Charge. T.1 APPLICANT TO READ AND SIGN INDEMNITY: Applicant understands and by his signature to this application to hold the City of Edmonds harmlessfrom injuries, damages, or claims ofany kind or 'description whatsoever, foreseen'or unforeseen, that may be made against the City of Edmonds, or any of its departments or employees, including or not limited to the defense of any legal proceedings including defense costs and attorneyfees by reason of granting thispermit. THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL INSPEC- TION AND ACCEPTANCE OF THE WORK ESTIMATED RESTORATION FEES WILL BE HELD UNTIL THE FINAL STREETPATCHIS C011PLETED BY CITY FORCES, AT WHICH TIME A DEBIT OR CREDIT WILL BEPROCESSED FOR ISSUANCE TO THE APPLICANT Two sets of construction,drawings of proposed work required with permit application. A 24 hour notice is required for inspection. Please call the Engineerini Division, 771-0220. Work and material is to be inspected during progress and at completion. Restoration is to be in accordance with City Codes. Street shall be kept clean at all times. Traffic Control and Publi'd,,Safety shall be in accordance with City regulations as required by the City Engineer. All street cut trench work sh�all be patched with asphalt or City approved material prior tothe end of the working day; NO EXCEPTIONS. I have read the above statements and understand the permit requirements and the pink copy. of the permit will be,, available on site..al all timesfior, * spection purposes. Signature., Date: _1_(C!61�6n1"tr`actor or Agent) CALL DIAL -A -DIG PRIOR TO BEGINNING WORK' FOR CITY USE ONLY APPROVED BY: RIGHT OF WAY FEE: -,212, TIME AUTHORIZED: VOID AFTER I Lo DAYS DISRUPTION FEEIFUND I H: SPECIAL CONDITIONS: RESTORATION FEE: T OTALFEE: RECEIPT NO.: ISSUED BY - NO WORK SHALL. BEGIN PRIOR T&T1fRN'IIT ISSUANCE Eng. Div 1997 FIELD INSPECTION NOTES (Fund 11.1 Route copy to Street Dept.) Comments: "Diagram CONTRACTOR CALLED FOR INSPECTION El YES El NO Partial Work Inspection by P.W.: Work Disapproved By: Date: FINAL APPROVAL BY: Date: 13) 7 -7/c4k AY \/V '�-b - q -7 AIEW 1419�1- --�fA6nL I I PVL,- 1) )'31 r7 (NE—W cous-�, CitEdmon& f RIGHT-OF-WAY�;CONST]ItUCTION PERMIT 6717- C4 Pennit Number. UsueDate: A. Address or Vicinity of Consiru6tion: 21,317 76 AV W (9716315) 9 C� B. Type of Work (be specific): Install 55' of 1-1/4" MPE IP on 76 Av W from 25' W to East edge of ROW @ 3101 + — N C/L 214 St SW C. Contractor: Puget Sound Energy Contact: Mastmne Kingsbury Mailing Address:' 1122 75 St SW Everett Phone: 356-7500 X7596 State License #: 98203 Liability Insurance: Bond:$ D. Building Permit # (if applicable): Side Sewer Permit. # (if applicable): E. Commercial Subdivision El City Project [Z) Utility (PUD, tTE, WNG, CABLE, WATER) Multi -Family Single Family EJ Other INSPECTOR: INSPECTOR: wk4cotJ F. Pavement or Concrete Cut: Yes []No 3 G. Size of Cut: x H. Charge - $ ffA APPLICANT TO READ Ai4D SIGN INDEMNITY. Applicant understands and by his signature to this application, agrees to hold the City ofEdmonds harmless from injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, that may he made against the City of Edmonds, or any of its departments or employees, including or not . limited to the defense ofany legalproceedings including defense Costs, and attorney fees by reason c;fgranting this permit. THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL INSPECTION AND ACCEPTANCE OF THE WORK ESTIMATED RESTORATION FEES WILL BE HELD UNTIL THE FINAL STREET PATCH IS COMPLETEO BY CITY FORCES, AT WHICH TIME A DEBIT OR CREDIT WILL BE PROCESSED FOR ISSUANCE TO Eyf�viilvkr� Construction drawing of proposed work required with permit application. A 24 hour notice is requi . red for inspection; Please call the Engineering Division, 771-0220. J U N 3 0 1997 Work and material is to be inspected during progress and at completion. ENGINEERING Restoration is * to be in accordance with City Codes. Street shall be kept clean at all times. Traffic Control and Public Safety shall be in accordance with City regulations as required by the City Engineer. All street cut ditches shall be patched with asphalt or City approved material prior to the end.of the working day; NO EXCEPTIONS. Ihave read the above statements and understand thepermitrequiremehts and thepink copy of thepermit will be available on site at all times for inspection purposes. 97 Signature: e: ohtractgf(j Agent) CALL DIAL -A -DIG PRIOR TO BEGINNING WORK. FOR CITY USE ONLY APPROVED BY: &6J- RIGHT OF WAY DEPOSIT TIME AUTHORIZED: VOID AFTER A%A) DAYS DISRUPTION FEE/FUND III: SPECIAL CONDITIONS:. -7, 761E, 4_- COMMENTS: RESTORATION FEE: PERMIT FEE: TOTAL FEE: RECEIPT FEE:, DATE:- ISSUED BY:, NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE Eng. Div. 1994 FIELD INSPECTION NOTES Comments: Diagram (Fund -111 - Route copy to Street Dept.) CONTRACTOR CALLED FOR INSPECTION El YES E] NO Partial Work Inspection by P.W.: Work Disapproved By: Date: FINAL APPROVAL BY: Date: CITY OF EDMONDS BARBARA FAHEY . . . . . ..... MAYOR 250 5TH AVENUE NORTH EDMONDS, WA 98020 (206) 771-0220 FAX (206) 771-0221 HEARING EXAMINER FINDINGS, CONCLUSIONS AND DECISION OF THE HEARING EXAMINER � CITY OF EDMONDS APPLICANT: Bruce Goodnight CASE NO.: V 97-40 LOCATION: 21317 76th Avenue West (see Exhibit A, Attachments 1, 2 and 4). APPLICATION: A variance for an 8-foot fence on top of a 2 to 4 foot high retaining wall where the maximum permitted combined fence and retaining wall height of 6 feet is allowed. The requested variance has been proposed to'mitigate potential impacts to the exist) condominium to the south of the proposed development (see Exhibit. A, Attachments 2, 3, 4, 5 and 6). REVIEW PROCESS,: Variance; Hearing Examiner conducts public hearing and makes final decision. MAJOR ISSUES: a. Compliance with Edmonds Community Development Code (ECDC) Section 17 (FENCE HEIGHT). b. Compliance with Edmonds Community Development Code (ECDC) Chapter 20 (VARIANCES). Description of Proposal Application by Bruce Goodnight to install an eight toot high fence along the south property top of a 2 to 4 foot high retaining wall. The proposed fence is intended to mitigate impacts to the existing condominium to the south of the proposed development. The F fence is a requirements placed on the subject property by the ADB as part of its approve D 12 unit multiple family complex (File No. ADB-97-12 1) (see Exhibit A, Attachments 2, 3, 4, 5 and 6) SUMMARY OF RECOMMENDATION AND DECISION: Staff Recommendation: Hearing Examiner Decision: Approve with conditions Approve with conditions * Incorporated August 11, 1890 e Sister Cities International — Hekinan, Japan Hearing Examiner Decision Case No. V-97-40 Page 2 PUBLIC HEARING: After reviewing the official file which included the Planning Division Staff Advisory Report; and after visiting the site, the Hearing Examiner conducted a public hearing on the application. The hearing on the application was opened at 9:05 a.m., May 1, 1997, in the Plaza Room, Edmonds Library, Edmonds, Washington, and closed at 9:08 a.m. Participants at the public hearing and the exhibits offered and entered are listed in this report. A verbatim recording of the -hearing is available in the Planning Division. HEARING COMMENTS: The following is a summary of the comments offered at the public hearing. From the City: Jeff Wilson, Current Planning Supervisor, entered the staff report into the record and recommended approval of the request with conditions. From the Applicant: Bruce Goodnight, applicant, said he concurred with the conditions and said that the proposed retaining wall and fence will provide privacy for the adjacent neighbors. From the Community: No one from the general public spoke at the hearing. FINDINGS OF FACT AND CONCLUSIONS A. Site Description I 1. Site Development And Zoning:. a) Facts : (1) Size: The subject property is 32,228 square feet in area. The proposed fence would be located along the south property line (see Exhibit A, Attachment 4). (2) Zoning: The zoning of the subject property is Residential, multiple family, 2.400 square feet of lot area required p er dwelling unit (RM 2.4). (3) Existing and Proposed Development: * The site is currently vacant. A single family building was recently moved off the site to allow the construction of a new 12 unit multiple family development. The ADB has granted approval of the design of the new building, and the applicant has applied for building permits. (4) Terrain'and Vegetation: The subject property slopes gently down to the east away from 76th Avenue West, and then slopes down steeply at the eastern end of the property to the adjacent developments. All vegetation has been removed from the site in preparation for construction. The applicant is proposing to redevelop the site with ornamental landscaping around the perimeter of the site (see Exhibit A, Attachment 4). Hearing Examiner Decision Case No. V-97-40 Page 3 2. Neighboring Development And Zoning: a) Facts: (1) North: Developed with a 12 unit multiple (family dwelling complex. and zoned RM 2.4. (2) South Developed with a 12 unit multiple family dwelling complex. and zoned RM 2.4. (3) East: Developed with a large multiple family dwelling complex and zoned CG under a contract rezone. (4) West: Currently under constructiol I with a new high school. and zoned Public Use (P). b) Conclusion: The proposed development would be consistent with the surrounding zoning and development. B. Edmonds Community Development Code (ECDC) Compliance 1. Compliance with RM 2.4 2. Zoning Standards a) Facts: (1) The fundamental site development standards in a RM 2.4 zone are set forth in Chapter 16.30. (2) The proposed building and site development conforms to all RM 2.4 requirements. (3) ECDC Chapter 17.30 states the standards by which fences may be developed, including height. The standards from which the applicant is requesting relief are: "Unless a variance isfirst obtained nofence or hedge shall be more than 6jeet in height as measuredfrom the top of thefence to the lowest original grade "(ECDC IZ30.000(Q). and "When a retaining wall tree feet or greater -is contiguous to andbelow aproposed fence, the proposedjence may be constructedfor the purposes of safety not greater thanfourfeet above the top of the retaining wall or thefinisihed grade, whichever is less. " (ECDC 17.30. OOO(D)). b) Conclusion: As conditioned the proposal complies with the development standards for RM 2.4 zones as set forth in Chapter 16.30 and 17.30 except the standard for which the applicant is seeking a variance. Hearing Examiner Decision Case No. V-97-40 Page 4 3. Compliance with requirement for a Variance ECDC Chapter 20.85 (Variances) states an applicant may request a variance from the standards of this Chapter pursuant to the procedures set forth in ECDC Chapter 20.85. Chapter 20.85 of the ECDC also sets forth the mechanism whereby a provision of' the Code may be varied on a case -by -case basis if the application of the provision would result in an unusual and unreasonable hardship (see Exhibit A, Attachment 2). a) Facts: (1) ECDC Section 20.85.010 establishes the decisional criteria with which a variance request must comply in order to he granted by the Hearing Examiner. These criteria include: a special circumstance must exist; no special privilege is granted. the proposal is consistent with the Comprehensive Plan and the Zoning Code; the proposal will not be detrimental and is the minimum necessary. (2) Variances may be used to modify bulk standards. They may not be used to, modify use or procedural requirements. (3) The applicant states that special circumstances exist due to the adjacent development. "The proposed Rose Ridge Condominiums are situated between two existing condominium projects. The adjacent Rose Pointe Condominiums are to the north with the rear yards facing the site. The adjacent Stratford Square Condominiums are to the south with their rear yardsfacing the proposed project. The proposedJence is to buffer the impact of the two adjacent rear yards. that of the proposed Rose Ridge, and the adjacent Stratford Square Condominiums. as required I—v the ADB. (4) The applicant states that the proposal would not he a grant of special privilege as other fence height variances have been- granted by the City of Edmonds, for buffering adjacent properties. Many of the other sites which used taller fences to buffer impacts are buffering commercial impacts from existing multiple family developments. These sites include the Top Foods site and the Funtasia site. One case where an impact from a new Multiple Family project was buffeted from an existing Multiple Family site was at the Cottage Crest Condominiums on 196th Street Southwest. (5) The applicant states that the proposal is consistent with the Comprehensive Plan .and by developing multiple family while protecting privacy. (6) The applicant states that the proposal is consistent with the Zoning Ordinance as the applicant is developing twelve units where the zoning allows twelve units. (7) The applicant states that the proposal will not be detrimental as the fence was required by the ADB to mitigate privacy reduction impact. Hearing Examiner Decision Case No. V-97-40- Page 5 (8) The applicant states that this is the minimum variance because, based on testimony by adjacent property owners., the ADB recommended that the height of the fence be allowed to be eight feet along the southern property line. (9) The proposed design has been approved by the ADB with the condition that the applicant obtain a variance to allow the proposed fence height (file No. ADB-96121 ) (see Exhibit A, Attachment 6). b) Conclusions: (1) Special Circumstances Special circumstances include the size. shape, topography, location or surroundings of the property and public necessity for public structures. Special circumstances exist for this proposal due to the location or surrounding.. of the property. Specifically. the condominium project to the' north is oriented. with the drive aisle on the north side and the backyards on the south side, while the condominium project on the south is oriented with the drive aisle on the south side and the backyards on the north side. This requires the backyards of the proposed project to face the backyards of an existing project. (2) Special Privilege It does not appear that any special privilege will be demonstrated in granting'this variance as other fence height variances have been granted by the City 'of Edmonds for buffering adjacent properties. (3) Zoning Code and the Comprehensive Plan Approval of the proposed variance would allow for the development of the site in a manner consistent with the intent of the Zoning Code and the Comprehensive Plan designation of the site while preserving privacy of adjacent properties. - (4) Not Detrimental Approval of the variance would not be detrimental to the public health. safety or welfare because the proposal is intended to reduce detrimental impacts. . (5) Minimum Required The request is the minimum necessary to reduce the possible impacts of tile proposal on adjacent properties. Hearing Examiner Decision Case No. V-97-40 Page 6 C. Technical Committee 1. Engineering Division Comments a) Fact: The Engineering Division has commented that the height of the fence. adjacent to 76th Avenue West must not he allowed at a height which would create a vehicle sight obstruction for vehicles entering and exiting 76th Avenue West. b) Conclusion: A condition should be incorporated into the decision stating that the applicant must obtain a building permit for the proposed fence, and that the fence must comply with the regulations of the City of Edmonds Engineering Division with respect to vehicle sight distance. 2. Other Comments a) Fact: No other City Divisions or Departments submitted comments. D. Critical Areas Ordinance 1. Facts: a) The subject proposal is subject to review under ECDC Chapter 20.1 SB (Critical Areas Ordinance). b) The applicant has submitted a Critical Areas Checklist, and the City has issued a Waiver from the requirement to prepare a Critical Areas Study (File No CA-96-21 1) 2. Conclusion: The applicant has complied with the requirements of the ECDC Chapter 20.15B. DECISION Based upon the foregoing findings and conclusions, the request for a variance is approved, subject to the following conditions: 1. This variance is to allow the proposal in the location identified on the proposed site plan (see Exhibit A, Attachment 4). Any other structures, additions or remodels would have to conform with the typical setbacks or height requirements for the zone or the applicant/property owner would be required to obtain an additional -variance. 2. This application is subject to the applicable requirements contained in the Edmonds Community Development Code. It is the responsibility. of the applicant to ensure compliance with the various provisions contained in these ordinances. 3. The applicant must obtaining a building permit for the proposed fence. Hearing Examiner Decision Case No. V-97-40 Page 7 4. The fence must comply with the regulations of the City of Edmonds Engineering Division pertaining to vehicle site distance obstruction. 5. The permit is transferable. Entered this 9th day of May, 1997, pursuant to the authority granted the Hearings Examiner under Chapter 20. 100 of the Community Development Code of the City of Edmonds. �on McConn—ell Hearing Examiner RECONSIDERATIONS AND APPEALS The following is a summary of the deadlines and procedures for filing reconsideration's and appeals. Any person wishing to file or respond to a recommendation or appeal should contact the Planning Department for further procedural information. REQUEST FOR RECONSIDERATION Section 20.100.010.G allows for' the Hearing, Examiner to reconsider his decision or recommendation if a written request is filed within ten (10) working days of the date of the initial decision by any person who attends the public hearing and signs the attendance register and/or presents testimony or by any person holding an ownership interest in a tract of land which is the- subject of such decision or recommendation. The reconsideration request must cite specific references to the findings and/or the criteria contained in the ordinances governing the type of application being reviewed. APPEALS Section 20.105.020.A & B describe how appeals of a Hearing Examiner decision or recommendation shall be made. The appeal shall be made in writing, and shall include the decision being appealed along with the name of the project and the date of the decision, the name of the individual or group appealing the decision, their interest in the matter, and reasons why the appellant believes the decision to be wrong. The appeal must be filed with the Community Development Director within ten (10) working days after the date of the decision being appealed. LAPSE OF APPROVAL Section 20.05.020.0 states 'Unless the owner obtains a building permit, or if no building is required, substantially commences the use allowed within one year from the date of approval, the conditional use permit shall expire and be null and void, unless the owner files an application for an extension of the time before the expiration date.' Hearing Examiner Decision Case No. V-97-40 Page 8 NOTICE TO COUNTY ASSESSOR The property owner may as a result of the decision rendered by the Hearing Examiner request a change inthe valuation of the property by the Snohomish County Assessors Office. EXHIBIT: The following exhibit was offered and entered into the record A. Planning Division Advisory Report PARTIES OF RECORD: Bruce Goodnight Goodnight Brothers Construction P.O. Box 669 Edmonds, WA 98020 Edmonds Planning Division Edmonds Public Works Division Edmonds Engineering Division Edmonds Parks & Recreation Division Edmonds Fire Department PROJECT -REVIEW CHECKLIST-" PROJECT NAME'.`.,,� 4 LAN 61. PROJECT ADD tSS. ; RECEIPT DATE ... ..... 0. BY: nif 1. PLAN., WATER.: MINI Im.- 0 E ......... FIRE:' SEWER' . ­:!�'i*' om M- o- M.W.LTs rrM MUM we Conditional Use --Permit ADS Requirements 4 Cther Zoning Requirements I _7111 WIMEMM 07201, MWER ME, 10. M-fr-rq7*7r-=1 MWOMIZE-12 �MIMIMMZM'11� MMM I IrOM-i Ina ��Mfm &*4:Tj4-trV7*TtT5T-MM. 0 11,111 EM11:1111:41-u-9mv ,A .1 "� , IM a, op %4,! 1W7*-M11r-_TT9N7#TroTo1LTr_Mo Mjff=,�� MEMMMEM 1#Trf rX93 FM 711MMM-To EM1111 rlql-.�Mgmm MMMI MMKM ����Mmmwm M10 _.�Mm �11 brFM MV MIX -10KN MINE m MM��� M. �=m Setback - Storm Drain UnW./ �open Ditch __ Existing M_41�77(/m ml�Mm 'Culvert Required M spam.�MIMMEM Culven Size 11MR-1 MINE, miwl.m��Em M, MMM:Tmq��- 'Catch Basin Required �10`61 'Driveway Slope & Vehicle Access iSidewalk Required �Curb & Gutter Required M&MOME MMMM��MM Street Paving Required I In "I gm T"no Street Name Sign Required Other Signing Required 'FEMA Map Check/Water Table iSide Sewer Availability :1/-� ,:Create Street File mum?"M MMEM Water Meter Size M91712-200 ME, NWIMMI, 'Mr Service Line Size I M. W, 010, M MINIMUM,= EM E�=! �1- m-_ _._ "M '11 wa �Hydrant Required Hydrant Size ExMng MIN I ROME"." � 0.15R �� MR MMMII� ME MAAMJMAWM��MN Reviewed By: FIRE I PLANNING ENGINEERING PUBLIC WORKS 1,J/ 0UBLIG-WORKS DEpj PERMIT APPLICATION. REQUIREMENTS o: Applicant rom: Jamal Mahmoud, Engineering bLVector "ne, rc, PlanChe&No: 9?-gv fter review of the subject permit application, the following requirements must be met: Construction hours are: WEEKDAYS — 7:00 AbL-10:00 PJVL;WEEKENDSIHOLIDAYS — 10:00 A.IVL-6:00 P.M. A separate RIGHT-OF-WAY CONSTRUCMON PERMIT is required for all work on public property. (ECDC 1&60) Truck haul route plan must be submitted and approved prior to. permit issuance. Builder/owner is responsible for containing all temporary runoff and erosion control on site (ECDC 18.30-030d). NO WORK SHALL BE DONE WITHIN 15 FEET OF STREAM OR 10 FEET FROM ANY CLOSED DRAINAGE FACILITY. BUILDER/OWNER IS RESPONSIBLE FOR IDENTIFYING CONDITIONS ON THE DRAVVi&G. (ECDC 1&30.50G) FILTER FABRIC FENCE SHALL BE INSTALLED AND INSPECTED PRIOR TO CLEARING AND CONSTRUCTION. (ECDC 1&30) INSPECTIONS ARE REQUIRED ON STORM DRAINAGE SYSTEMS, TIGHTLINES AND CATCH BASIN INSTALLATION. INSPECTIONS ARE REQUIRED PRIOR TO BACKFILIANG. (ECDC 1&30) Repair or replace all defective existing curb, gutter and sidewalk adjacent to the property. If an intersection is involved, a handicap ramp may be required. Contractor shall meet with the City Engineering staff to determine the extent of repair prior to issuance of the permit (ECDC 1&90) Driveway slope shall not exceed 14% without a waiver. Every attempt should be made to keep the slope below 14%. Waiver granted to 2-0 - %. (ECDC 18.80.060D) Driveways must be paved from' property line to City RIGHT-OF-WAY. A separate permit is required. (ECDC 18.80.060C) INSPECTIONS ARE REQUIRED ON DRIVEWAYS AND SIDEWALKS PRIOR TO AND AFTER POURING. (ECDC 18.30) No burning of construction refuse without a permit from the Fire Department Connection to City water sye-em is required. There is a sepatate charge -for the water mew (ECD.0 7.20).. A back water valve is required if downstaiis plumbing is below the elcva*tion of upstream manhole. (ECDC 7.20) Water and sewer main lines should be separated by 10 feet minimum. (ECDC 18.10) Connection th City sanitary system is required. A separate permit is required. LID# Fees paid: Yes No Charge- (ECDC 18.10) Underground wiring is required on all new construction, and for additions, alterations, and repairs that exceed 500/o of the total assessed value of the structure. (ECDC 1&90) A FINAL ENGINEERING INSPEiCnON IS REQUIRED PRIOR TO THE BUILDING DIVISION GRANTING OCCUPANCY OF THE BUILDING OR STRUCTURE. (ECDC IMO) 1 aAMIM k S3 STREFT FILE MAR 17 PERMITCOUVr Vto T- L* 4o I AZD + 411, + 414. 4kT AuiE LmE 41LI + ZC'A 4A. & 5** e-.Oc 8 MAA Z14E Pexl.)AL. 7 bukil oz ik2� 415.zr-+ 445-1- 4o,z:s-+4kj. 4%Z.. 9 75'+ Z5* 4-57.8 7-�r+ -Ir apoC 44ZB7!r re)f+,x 2)y Ptrm- Pi.& A63-76' Arb4r- 44.7C etvuAL. 43 4ox!r-t 411, 75,+ 4o'6.79 -t 4o+ 44,76+ Z-5"- 431.76. .43L. 6 m" ajbc4i X Pd-Al> PL kLL� RQ if— Aczo ftL- *3 -but LAOILWI 09�O ? -t-0 C. 18 C) 13 C-) CITY OF EDMONDS 0 BARBARA FAHEY MAYOR 250 5TH AVENUE NORTH - EDMONDS, WA 98020 '- (206) 771-0220 - FAX J206) 771-0221 - COMMUNITY SERVICES DEPARTMENT - Public Works a Planning * Parks and Recreation * Engineering March 31, 1997 STREET FILE '5 12- Del Erickson, P.E. 15020 S.E. 46th St. Bellevue, WA 98006 Subject: - Proposed 12 Unit Development 21217 - 76th Ave. W. (ADB-96-1 Z11 Dear Mr. Erickson, The Engineering Division is not able to adequately review the submitted plans because the storm calculations do not conform to SCS methodology as required in the attached Ordinance No. 3013. Please revise the calculations and the plans accordingly so that review of the project can take place. The Engineering Division is withholding comments on any other issues until the revisions are received. When the revisions are completed, please resubmit four sets of plans, along with a set of the revised calculations. If there are any questions, do not hesitate to contact Don Fiene at 771-0220, extension 323. Sincerely, James C. Walker, P.E. City Engineer GCH/JCW1sf Enclosures cc: Lara Knaak, Permit Coordinator A96121.DOC e Incorporated August 11, 1890 * Sister Cities International — Hekinan, Japan u. . . . . . . . . . ......... 01; .9. 9 4, A), city, EuMbU I ah �S_ * 4s) %.V, z b- r. ic rea h KI 'ne Critical Areas Che&lisi- on k6�='it it to the at Wiff W) 77W oy. ne city d& f0m is to-'.bc filled out by my Pawn." t�� die site makea MC VISIt" tfid nati P_ ursory ­­` Prqp;anng,aP,,qy lop .nl . R .,,p, . �- - _'� .. i: iia" jet"i on of th& S Application, Bor the City of EdniWds-p n-'o-r,,) _awyov� `,�j necesSarY to complete a to his/h er submittal of -a develOPMenti' '--deve1Dpftwperjnit plicati­­;'<'1' ap on. permit. to the City. With a signed c orm,,the Vy of this f ne Purpose of -the -Checklist -is- to -enable aPPXM Should also submi . t a vicinity map - City Staff to determule-whether-2ny— or plot plan for individual lotsof the-p—arcel .potent.WCriticalL,�imai�.6i'�hiiybe.'..;�.-,---.-�- vdth 666g-b City staff can find present on 16�*�W�ject pro rt .6- !:iidenfif pe- Tbe.,1, 2mi. ydi;ESWjeCt 77 infonnatio-it neddM 1D complete the all ons shall indU& Checklist should, cuily, availaW ftidi 7 atlier p ns dbsw,�alio i of the site or dtj'ii�ii raphy map, -etc.) or studies.in City Hall (Crx ml-Areas inventories, C60jubtfiodw MOMeWj�t-- IT12pd 1*2 ? or Sod St:2k_ Jed AWCOMP ng their prelitnina ry, volt-Assessmentof the 6 Anapplicanti-or" �reprd�Mtative, must fill out the checjdist� sign and date i I havicompleted- the attachM"Ciiii 69-Aiji j- 1 7 Checklist and attest that the answers provided are fiactual, to the best of my knowledge (fill out the apPropfiate column below) Owner I Applicant: - R�present:ative: A t A Name ka. k - .0, PON Street Address Strtet Addr= ;0'4; 0- City, State, ZIP P hone , -3. �y, State, Phone 7.7�' Signature ii6i a e,,,,,' s, D t Ignature Datel;sx 44, re st 9,� `.Crifical',"A' as�Chd&fii C Y7 Site infe.'rmation'.-(so,iL�lwp,6graphy/hyd I M4: Ito umf WE Property Tax 2 Account Number Ifs, App rOximate Site Size (acres or square feet): ., 4. Is this site currently developpd? no. ---&-yes; If yes; how is site developed? topography. Check all that ��-,JP 5. Describe the general site V - ih P p Flat: less than 5-feeeli%iiii6n cbange over 'entire site. Rolling: slopes on site g�q�.Iess than 15% P vertical. Kise4of -10466t orEw hi n6lldis�n 'Of isr;k). IG iJi.,t LnA�4; "T, SlOpespresent on site of more than 15% and less-iMn,16%,('iv��"­�' ,of 164eet 0 v�*eir a horiz;6ntal distance of 33 to 66-feet)-31 -StecP: .9rades of greater than30% present on site (a,�e&tc�:�rise Of loifi.ek,.,O� Wizontal distance of less 9m 33-feet). (please describe): 6.- Site containsareas of year-round stafidip'g w'aiter A ..pprq�. Depth: 7. Site cb�jjins areas of S��n .stah&t vrAw.:� ;al ng Approx2 Depth�' What season(s) of the yearT 8. Site is,M-- the fioodi�iy flood I p am of a water course. 9. Site'Contaig'a creek oran area wh 0,ws ere ' waW.flows across the grounds surfaceT F1 are-year-� rou�d? �_'Flowis* a*re seasonal? (What time of year? 10. Site is primarily: forested ;-meadow shrubs t11c_Z ;.Mixed urban landscaped (la wn,shrubs etc) 11. Obvious wetland is present on site: for City Staff Use Only 1. SiteiiZOMV 2. kS triapped soil type(s)? ,h5� 3. Wedand inventory or C.A_ rnap indicates wetla�d p*resent on site? Al-0 ---,Cr , itical Areas inventory or C.A. xnap indicates Critical Area on site? ; -A�_) te W4 5.. "Si t�,'ri designated earth subsidence landslide hizud area? 6. jes';tgnated on the Enviroarnentally,SensitiveAreas MaIP J -D RN ETE —MATION P, C "-YMDY R-13,01UMED CONDMONAL WAjV*EX1. IYER RevieWed by,. .�lan er I Date CETV RCWQlffl4tV4 AR.1 31597 EmnOUNTER I RECORDED RNfADD .20 i of, iii6nd's''Biuildin' Division 97 HAR:1 3 PH;2 9 -7 "t VV.250'5th`Avenue North AUDITOR Edmonds;'WA 98020 SNOHOMISH COUNTY. WASH.- DEPUTY--- BUILDINo MAR 2 8 1997 DECLARATION OF RESTRICTIVE COVENANT MULTI-FAMMY RESMENTLAL Reference N: Grantor(s): (1) 7101:01,ndMll-g- I Additional on pg. Grantee(s):- City of Edmonds Legal Description (abbreviated): Sec e,2-7 Twn; ,-,Pz Al Rng o 51.6 tr OR Lot — Block�?�P-z�,oPlate!S�Z�-Y - 64a."v.4 7A4 Assessor's Tax Parcel IDN(s): (1) 4<6 j1- e0o - 00 > --a*)— 06 Assessor's Tax Parcel IDN not yet assigned WHEREAS, / wm 3.e 0-7 x ( - are the owners of the f'oflowing described real estate in the City of Edmonds, to wit: Property Address: Legal Description: /2/1/2A�j /0- el 0 Assessor's Tax Parcel ID # 54 "0 0 0 oo;> — 00 0 WHEREASO the above named owners are desirous of imposing a restrictive covenant upon said premises in co mpliance with Section 19.00.040 of the Edmonds Community Development Code. VOL 32.80PABE0626 Mk W 7"It 1. RETURNADDRESS: City of Edmonds, Building Division -'250 5th Avenue North Edmonds. WA 98020 WITNESSEII�, that for and in consideration of the premises, the above named. -owners do hereby declare and grant to the City of Edmonds as Grantee the following restrictive covenant, to - wit: That at the time of the execution of this Covenant the Grantors have agreed to the Ordinance of the City of Edmonds provide that no building for multiple family housing may be erected on subject property containing more than units. Said Covenant shall be binding upon all present and future owners of said real estate and their heirs, successors and assigns. DATED this day of '19 GRANTOR State of Washington )ss County of SnOhOmish I I certify that I know or have satisfactory evidence that Brim K Goodn:Lght _ signed this instrument, on oath stated that he/she was authorized to execute the instrument and acimowledged it as the grantor — (title) of =DNI[CM MW COMT (name of party on behalf on whom instrument was executed) to be the free and voluntary act of such party for the uses and purposes mentions in this instrument. Subscribed and sworn to before me this 13th day of iss" 19 97 0, NOTARY 'V- ( I--- - No Wasl�iiigton. PUOUC �P Al commission expires Ju]Ly 31, 1999 Y X va. 3280PA6EO627 97031302.8 5 PLANNING DATA SITE ADDRESS:-21313,15,17 76th Avwe W DATE: 3/27/97 ZONING: RM 2.4 PLAN CHK#: 97-80 ADB # 96-121 PROJECT DESCRIPTION: 12 unit Multiple Family Building SETBACKS: Required Setbacks: Front: 15 Left Side: 10 Right Side: 10 Rear: 15 Actual Setbacks: Front: I--/ Left Side: Right Side: Rear: CORNER LOT no (Yes/No) LEGAL NONCONFORMING LAND USE DETERMINATION ISSUED NO (Y/N) LOT COVERAGE: Maximum Allowed: 45% Actual: BUILDING HEIGHT: ?/-A Maximum Allowed: 25 + 5'for a 4:12 roof Actual Height: 7�- Datum Point: P. 4:'eae4-A,,� Datum Elevation: SUBDIVISION / LOT LINE ADJUSTMENT: No CRITICAL AREAS #: (VA!:r& SEPA DETERMINATION: DNS w/ADB, appeal exp 12/10/96 LOTAREA: DENSITY ALLOWED 1 per 2,400 s.f. UNITS ALLOWED 13 PROPOSED-1 2 BONDING REQUIRED (ys/no) yes .(for what?) Landscaping $ ' &00 OTHER: Al-1110 li-ef5e-E-D Fe,-7t- r!!� Z"V5CtVg- Azz Plan Review By: �7, 71- OEOTECH CONSULTANTS, INC. 13256 N.E. 20th St. (Northup Way), Suite 16 Bellevue, WA 98005 (206) 747-5618 FAX 747-8561 Goodnight Brothers Construction P.O. Box 669 Edmonds, Washington 98020 Attention: Brian Goodnight Ic I APR 0 1 1997 PERMIT COUNTER Subject: Geotechnical Engineering Considerations Proposed Rose Ridge Condominiums 21317 - 76th Avenue West Edmond, Washington Dear Mr. Goodnight: March 31, 1997 JN 97115 On March 28, 1997, a geotechnical engineer from our office visited the site of the proposed Rose Ridge Condominiums at 21317 - 76th Avenue West in Edmonds, Washington. The purpose of this visit was to explore site subsurface conditions and to provide recommendations for foundation design. The recommendations and conclusion presented in this report are professional opinions based on the visual observations made during our site visit and on previous experience with other projects in the vicinity. We understand that you propose to construct three multi -unit buildings, totaling 12 units, on the project site. The two westemmost building will have wood framed floors constructed over a crawl space. The easternmost structure will have a daylight basement. The subsurface conditions were explored by excavating four test pits in or near the proposed building footprints. The test pits were excavated on March 28, 1997, with a trackhoe provided by the client. A geotechnical engineer from our staff observed the excavation process and logged the test pits. The test pit logs are maintained in our files and are available upon request. The site has been cleared and most of the topsoil removed! The soils at the test pit locations generally consist of one to three feet of loose to medium -dense reddish -brown silty sand with some gravel and roots, overlying several feet of medium -dense to dense gravelly sand. The gravelly sand is underlain by dense to very dense glacial till soils consisting of gray silty sand with gravel to a maximum explored depth of eight feet. No groundwater seepage was observed in the test pits. It should be noted that groundwater levels vary seasonally with rainfall and other factors. It is possible that perched groundwater could be found between the near -surface weathered soil and the underlying dense glacial till. A Goodnight Brothers Construction JN 97115 March 31, 1997 Page 2 CONCLUSIONS AND RECOMMENDATIONS Based on the observations made during our site visit, it appears that construction of the three condominium buildings is feasible from a geotechnical engineering standpoint. The structures can be supported on conventional foundations that bear on competent native soils underlying the site. The proposed buildings can be supported on conventional footings bearing directly on medium - dense to dense native gravelly sand or the dense to very dense glacial till soils. These soils were encountered at about 1 to 3 feet in the test pits. Continuous and isolated footings should have minimum widths of 12 inches and 16 inches, respectively. The footing subgrades must be cleaned of loose or disturbed soil prior to pouring concrete. Footings constructed according to the above recommendations may be designed for an allowable soil bearing pressure of 3,000 pounds per square foot (psf). A one-third increase in this design bearing pressure may be used when considering short-term wind or seismic loads. For the above design criteria, it is anticipated that the total post -construction settlement of footings founded on competent, native soils will be about one-half inch. Lateral loads due to wind or seismic forces may be resisted by friction between the foundation and the bearing soil. We recommend using an allowable coefficient of friction equal to 0.40 for the foundation's resistance to lateral loading. LIMITATIONS The analyses, conclusions, and recommendations contained in this report are based on site conditions as they existed at the time of our site visit. If the subsurface conditions encountered during construction are significantly different from those anticipated, we should be advised at once so that we can review these conditions and reconsider our recommendations where necessary. Unanticipated soil conditions are commonly encountered on construction sites. Such unexpected conditions frequently require making additional expenditures to attain a propedy constructed project. This report has been prepared for the exclusive use of Goodnight Brothers Construction and its representatives for specific application to this project and site. Our recommendations and conclusions are based on the site materials observed and on previous experience with sites that have similar observed conditions. The conclusions and recommendations are professional opinions derived in accordance with current standards of practice within the limited scope of our services. No warranty is expressed or implied. We trust that this report meets. your immediate needs for the proposed development. Please contact us, if we can be of further service. Goodnight Brothers Construction March 31, 1997 Respectfully submitted, GEOTECH CONSULTANTS, INC. F, R T 4)* 29740 IST 'j"01VA1, S 1EXPIRES to-2,1,-1-7 I D. Robert Ward, P.E. Associate DRW:mmm JN 97115 Page 3 .,Z C. City of Edmonds RIGHT-OF-WAY CONSTRUCTION PERMIT Per I mit Number: Issue Date: /0 - 070 A. Address or Vicinity of Construction: -Ap-PA NOE.) CAJ B. Tvne of Work (be snecific).*N RCQ�'Vk k �1� I A K\4 &90.199- . Co Contractor: (C"W� RQVI Intact: L�\C'V� Mailing Address: AI�Ab VkQ,-( 9 � Phone: 6-7 0 — Z-'c),O C�l State License #: 00"WOS uA 9V),�Oo Liability Insurance: Bond: $ D. Building Permit # (if applicable): Side Sewer Permit # (if applicable): 0. E. F� Commercial EJ Subdivision El City Project D( Utility (PUD, GTE, WNG, CABLE, WATER) Multi -Family E] Single Family r-1 Other X $ INSPECTOR: 6#1494444A INSPECTOR: F. Pavement or Concrete Cut : 4;kyes 0No G. Size of Cut- x H. Charge$ APPLICANT TO READ AN GN INDEMNITY. Applicant understands and by his signature to this application, agrees to . f1de City of Edmonds harmleslP ..... (jJ1e;-,Z ages, or claims of any jUnd or description whatsoever, foreseen or unforeen, that may be made against,the City of Edmonds, or atiy of Us departments or: employ- ees, including or not limited to the defense of any legal proceedings including defense cdiiR�,�n�,abdrney fees by reason of dr4ntini'this pe"r7?dt.*-? p � THE CONTRA CTOR IS RESPONSIBLE FOR WORKMANSHIP AND MA TERIALS FOR A PERIOD OF ONE YEAR FOLLOWNG THE FINAL INSPEC77ON AND ACCEPTANCE OF THE WORK ES77MA TED RESTORA77ON FEES WILL BE HELD UN77L THE FINAL S7REET PATCH IS COMPLE7ED BY CITY FORCES, AT WHICH 77ME A DEBIT OR CREDIT WILL BE PROCESSED FAR)ibsqANcE To THEAPPLICANT,', , > - Construction drawing of proposed work keqt�ired wito. permit application. EA6fieerin Departm A 24 hour notice is required for inspection; Please call th 9 eJ= Work is to be inspected during progress and at completion. Restoration is to be i n accordance with City Codes. 771-0220 Street shall be kept clean at all times. Traffic Control and Public Safety shall be in accordance with City regulations as required by the City En&iter, e All street cut ditches shall be patched with asphalt or City approved matf Ab to the end otA,6"� "IfyiijkRlay; NO EXCEPTIONS. I have read the above statements and understand the permit requirements and the pink copy,of the permit will be available 11 fi on site at a tjjkne n I Signature:o�= M:L Date: (Contractor or Ag 10 CALL DIAL -A -DIG PRIOR TO BEGINNING WORK ANCE Engrg. Div. 1991 FIELD INSPECTION NOTES (Fund I I I Route copy to Street Oept.) Comments: Diagram: CONTRACTOR CALLED FOR INSPECTION 0 YES 0 NO Partial Work Inspection by P. W.: Work Disapproved By: Date: FINAL APPROVAL BY: Date: Eng. Div. Jul: NOTICE: No warranty of accuracy. The information shown on the attached map(s) was compiled for use by the City of Edmonds, its Employees and Consultants. The City of Edmonds does not warrant the accuracy of anything set forth on these map(s). Any person or entity requesting a copy should conduct an independent inquiry regarding the information shown on the map(s), including, but not limited to, the location of any sewer stub shown. Such sewerstubs may or may not exist and may or may not exist at the location shown. Neither the City of Edmonds nor its employees or officers shall be liable for the information given on this map(s), nor for any one representation provided based upon said map(s). CIVIC * CITY OF EDMONDS CENTER — WATER -SEWER DEPARTMENT Call PROsPect 6-1107 when work Is ready for inspection. (No ins UORS Saturday, Sunday or holl Per' SIDE SEWER PERMIT "".) N2 1091 ADDRESS ............. OWNER ........ Mickey --- 119smon .................... .............................. CONTRACTOR .... W.1-11.&f ;L0 T) ............. Permission is granted ----------- Juna,.2k ............... 1 19.16A., for With CRY Sewers in ac'cordance with application on file and governing 0 "YS, to REPAIR or CONNECT a side sewer rdinances. ATTENTION IS CALLED TO THE FOLLOWING: NOTE No. 1—The owners of the property may obtain a Permit to construct sewer inside property line. A licensed Side Sewer Cont�actor must' be emPloyed to construct side sewer in street area. Do not cover any Portion of sewer before it has been Inspected. 7 No. 2--Obtain full Information regarding Ordinance 11.16.DW and Regulations governing side sewers when you get permit. E No. 3--Top of side sewer must have at least 30 Inches coverage at property line and 12 inches inside property line; No bends in grade sharper than % will be Permitted. minimum grade of 2%. NOTE No. 4—Trenches in street must be water settled and surface of street restored to original condition. Contractor be res Ible for failure due to improper work Which May develop within one Year of completion. NOTE No. 5--It Is unlawful to alter or do any other work than is Provided for in the permit, or to do any work on t: shall purten&nces except to insert the pipe Into the wye. e main sewer- or its ap- "TREET Fl f Edmordt LE jATIOR A I E R - P E R m r r OUTSIDE Ik ��IDE .0 ..REPAIRS 0 . I *,-�j —u / /, 4.) f_j WNEW.. 0 .... . .... .... .. fy .......... 0., 5. W.-A 9. H 0 U S E N ........ . ................... ................................................... . ........................... 7 'CARD No. EASEMENT No . .... ..... R. ... ... '0 . .. .... c/ .............................. CONTRACTO ................. ..... -.,,PERMIT STREET 7 AVENUELOT No . ...... / ....................................................................... BLOCK No`� .............. NAME ADD .... J A P P 0 Jl 2,6-.�j a"Va �;O, Date Approved: BACKFILL WORK ORDER ISSUED ................ ................... ....... DEPOSIT, ...................................................... SEWER WORK ORDER ISSUED ........................................ ....... BY.. DATE REVISION No. 2 HYDRAULIC CALCULATIONS FOR 2131-3-17 7-6-LI-i Jzk.Nrcarixaca Wqs�r�-�t jXPfRES %%-It -I April. 1997 Applicant: Goodnight Brothers ConsC. P.O. Box 669- Edmonds, WA. 98020 Tel: 517-4961 Engineer: Del Erickson, P.E. 15020 S.E. 46tb St. Bellevue, Wa. 98006 Tel: 747-5825 WALnnplLa! T N7 IE 0 DOWNSTREAM CONDITIONS: Attached hereto is a copy of the Off -Site Analysis prepared in December of 1995 by Land Development Consultants for the Rose Pointe Condos (parcel lying immediately north of the subject site). The downstream system for the subject project is identical to that described in the attached Off -Site analysis. OFF -SITE DRAINAGE: Contours generally fall across the property from the west to the east and southeast. No off -site runoff enters the subject parcel. It is bounded on the north by the Rose Pointe Condos whose storm drainage system collects and contains all runoff falling on that property. It is bounded on the west by 76th Avenue West which has curb and gutter, preventing any street runoff from entering the property. No runoff enters from the south or east as contours fall away from the site in those directions. WATER QUALITY AND QUANTITY CONTROLS: Runoff from the parcel is directed to an existing piped storm system bordering the subject property along its east property line. This piped system carries the site runoff to an ultimate discharge into Hall Creek. Storm water quantity controls for sites less than one acre in size, and discharging to a stream have been utilized for the subject site. Water quality control is not required as the site has'only 2 outside parking stalls. Water quantity control will be provided by a buried 84 inch diameter detention pipe and outlet control system designed to limit the peak rate of runoff to the pre -developed condition two-year, twenty-four hour design storm, while maintaining the pre -developed condition peak runoff rate for the ten-year twenty-four hour and one - hundred year, twenty-four hour storms. OFF -SITE DRAINAGE ANALYSIS PREPARED IN DECEMBER 1995 BY LAND DEVELOPMENT CONSULTANTS FOR THE ROSE"POINTE CONDOS WHICH BORDER THE SUBJECT PARCEL ALONG ITS NORTH I I PROPERTY LINE. THE DOWNSTREAM SYSTEM DESCRIBED IN THIS ANALYSIS THE THE SAME SYSTEM TO WHICH WE WILL BE DISCHARGING OUR DETAINED STOPMWATER RUNOFF. DOWN-STREAMJ)RAINAGE The off -site drainage down -stream from the property is shown in Figure 3. Surface water leaves the subject property through the existing catch- basin (station 0+00) located and the southeast corner of the subject property. The drainage flow then continues traveling south about 240 feet through an 12" storm drain to another catch basin on 214th St. SW (sts, 3+40). The drainage flow then travels east along 214th St. SW through 12" storm drains and five catch basins. to 73rd P1. W. (sta. 5+11). The drainage flow then travels south along 73rd Pl. W. through 12" storm drains and five catch basins to 216th St. SW (sta. 10+30). . The drainage flow then travels east along 216th St. SW through a 24" storm drain to station 13+20 and the end of the required path analysis'. From this point the storm drains appear to continue easterly crossing State Route 99 and out of the Edmonds City Limits. All the downstream drainage -facilities appeared to be, functioning adequately. No significant sedimentation, erosion or * flooding problems were observed in the down- stream drainage course. Deyplopment of the subject project will not permanently increase the sedimentation, erosion or flooding in the down -stream drainage courses. Uq-:U9A BIWI-E. GOODNIGI-I'l- 14PP IT 97 07:56 LAND DEUELOPMENT CONSULTANTS 2064818785 206-672-7837 P.02 TO: 206 672 7837 P02 � I Z ko 0 It S/ -f C., 710 L aAV 'PuZZ Nil sil MY �g, N. wos h 7 all, lj� IL cl 00" to uj 2.1 C%j IQ AV---A)9L- E:XMT]3mlrs .. . .... ..... . ... & , Lr md, 41 (Ij �q Nq ITAN I�A T4 4, 1 rill AI ka t Z7, pi-F j to. M 14 ;A 14 —.4 1 or qx, 'l A oil CA fic*- WALK (a 60. T �A t �A 'I 1 -4 - Ji vi tit fn tit STORNWATER MANAGE14ENT MANUAL FOR THE PUGET SOUND BASIN Table 111-1.3 -SCS Western Washington Runoff Curve Numbers (Published by SCS In 1982) Runoff curve numbers for selected agricultural, suburban and urban 1&nA tion friv- Tuna IR rninfAll Aiat-ribut-Ann. 24-hour atorm duration. LAND USE DESCRIPTION CURVE NUMBERS BY HYDROLOGIC SOIL GROUP A 'B C D ddltiVated iAnd(l)i Clilt t winter condition 86 91 �,94 95 ,-a 146distilh b0shaireast 46 u nt k In4 low growing�brush grasslands 74 82 89 92 teidqW-6k piitukei i itit d t# 01 Fbkchards 65 78 85 89 Obod or for4*t lAndt undisturbed 42 64 76 al W'. --d 'I 5)c r young second growth or brush ss 'i2 ai* 86 Orc r I with cover crop 81 88 92 94 Opop ipAcenj lawns, parks, golf courseef, cemeteries, landscaping .1 Good condition: grass cover on k75% of the 68 80 86 90 Fair conditions r cover on 50-75% of ;r::, 77 as 90 92 the area. dri4ei toads & parking lotat -7,6 as 89 91 VIA roads & parking lots: 72 82 87 89 k,iioiib.6urface9j pavement', roofs etd., 98 98 98 98 ,bpen Water bodies: J, lakes, wetla6de, ponds etc. 100 100 100 100 Singl6 family residential(2)- Dwelling Unit/Gross Acre SImpervioua(P) separate curve number i;O DU/dA is shall'be selected for IiS DU/GA 20 pervious & impervious 2iD DU/GA 2S portions of the site 2iS DU/GA 30 or basin 3.0 DU/GA 34 3.5 bU/GA 38 4.0 DU/GA 1...42. - 4.5 DU/GA 46 5.0 DU/GA 48 9.5 DU/GA 50 6.0 DU/GA S2 6.5 DU/GA 54 7.0 DU/GA 56 Oubinj condomi'apartments, %impervious commercial businesses must be inddstriil Areas computed I (1) Irojr.a.more detailed description of agricultural land.use curve numbers refer to National Engineering Handbook, Sec. 4, Hydrology,' Chapter 9j August 19721 .(2) A6iumes roof and drive ' way runoff is directed into atiest/storm system. (3) The 'remaining pervious areas (lawn) are considered to be in good . condition for these curve numbersi FEBRUARY, 1992 StORMWATER MANAGEMENT MANUAL FOR THiE PUGET SOUND BASIN Ti W travel time (minutes) L = ilow length (feet) V W average velocity (feet/sec) and 60 i conversion factor from seconds to minutes ArIMA of concentration (T,) is t lie gum o f T, values for the various consecutive flow ie"nts� Te me T1 + Tt + T 1 2 M iihore t T4. time of concentration (minutes) and number of flow segments b66aj flow is flow over plane surfaces. It usually occurs in' t�e headwater of iiirbams. "ith iheet flow, the friction value (nj (a modified Manning's effective rotighness coefficient that includes the effect of raindrop impacti drag over the plane 6urfacej obstacles ouch an litteri crop ridges and rockoj and'siddion and transportation of sediment) is used. - These n, values are for very shallow flow depthe of about 0.1 foot and are -only used for travel lengths up to 300 feet. Table ill-i. 4 gives' Manning I a n. values f or sheet. f low f or various surf ace conditions. �heet flow of up to 300 feetj use Manning's kinematic solution to directly For 6ompute Tt. Tt 0 N 42 InLV, - 0.327 6.4 t (P2) whores Tj 0 travel time (min), n. W sheet flow Manning's effective roughness coefficient (from Table 111-1.4). L flow length (ft), 2-year, 24-h6ur rainfall (in)' and P2 11 slope of hydraulic grade line (land slope, ft/ft) Velocity Equation A commonly used method of computing average velocity of flowi once It has measurable depth, in the following equation: . k wheret V velocity (ft/8) k time of.concentration velocity factor (ft/o) slope of flow path (ft/ft) "k" is computed for various land covers and channel characteristids with assumptions -made for hydraulic radius using the following rearrangement of Manning's equationt k (1. 49 (R)0-66') /n R an assumed hydraulic radius n Manning's roughness coefficient for open channel flow FEBRUARY, 1992- STOP14WATER MANAGEMENT MANUAL FOR THE PUGET SOUND'BASIN table 111-i.4 "n" AND "k" Values Used in Time Calculations for Nydrographe iin,* Sheet Flow Equation Nanning's Values (for the initial 300 fti of travel) n. ­­Imooth surfaces (concrete, asph gravel, or bare. hand p�cked fiklibw fields or laose @oil surface (no residue) .0.05 -ddltivatod mail with residue cover (as-0.20 ft/ft) 0.06 dditivatod *oil with residue cover.(n> 0.20 ft/ft) 0.17 grams and lawns 0.1s W 6 hib grasses �:.66ttuaa 0.41 grams (na�ur 0.13 d f, 6t f didit With light underbrush 0.40 lioodi ok.for6st with donee underbrush 0.80 ;Manning values for iheet flow only, from Overton and Meadows 1976 (See TR-55, 19"T "k" Values Used in Travel Time Time of Concentration Calculations Shallow concentrated Flow (After the initial 300 ft. of shest,flow, R -'0.1) ke I . Parest wIth hea�_Ygrouna 11tter and meadows (n - 0.10) 3 2. Brushy ground with some trees (n - 0.060) 5 Fallow or minimum tillage cultivation (n - 0.040) -A; Nigh grand (n - 0.035) 9 Short grass, pasture and lawns (n 0.030) 11 6. Nearly bare ground (n 0.25) 13 76 Paved and gravel areas (n - 0.012) 27 thannel Flow (intermittent) jAt the beginning of visible channels R 0.2)' kc 1. Forested swale with heavy ground-lItter (n 0.10) 5 2. Forested drainage couroo/ravine with defined channel bed (n O�050) 10 3. Rock -lined waterway (n - 0.035) 4; grassed waterway (n - 0.030) 17 S. Earth -lined waterway (n -.0.025) 20 6; CHP pipe (n - 0.024) 21 1; Concrete pipe (0.012) 42 ei Other waterways and pipe 0.508/n Channel Flow (Continuous stream, R - 0.4) ke ..9e Meandering stream wIth some poole(n - 0.040.1t 20 40i Rock -lined stream (n 0.035) 23 ll. Grass -lined stream (n 0.030) 27 i2i. Other streams, man-made channeI6 and pipe 0.807/n** FEBRUARY, 1997 4 C3c3-T-*L.s; -T-r4FlC)jRm-A--T,:EC)lW 0 STORMWATER MANAGEHENT FMUAL FOR THE PUGET SOUND BASIN f Table 111-1.6 Hydrologic Sail Groups fon Sells In the Puret Sound Basin too Type Hydrologic Soil Group Soil Type w Hydrologic Soil Group Agww Cotter C C Ahl 8 Custer ND Alto C Dabob ND Aidierwood C Delphi D Atero.q. Mdarwood It Dick ND Antos, Even" 8 Dimal D a Dupont D a Barlimord C C Edpwick C Saunwid B Md Nowntake 8 Elwell 8 C Esquatzel Bellingham D Everett A Bellingham variard C Everson D Bold" a Galvin D, now D Oetchell briscot D Giles sueltuf C Godfrey D Runkof R Greenwatei A Carey C Grove C Carlsborg "D flardins C Cagey ND flartalt ND Coasolory C 111011 ND Cathcart 8 Hokb ND Centralia 9 Hoodsport ND Chehalis 8 Hoogdol C Chesair A Hoyptis ND ciftew 9 flual ND Cullom C l[ndionolsk ND cu" 8 jonso a Ccosw beeches ...variable Jumpe ND, Karo""In CfD V.0taloch C Kowle C Kenton D Kilchlo C Republic 8 Kitup C Riverwash variable Klaus "D Robef C Kjone MD Salal C Lates C Sslkum B Leborn B Sammantish D LAIMMI ND Salt Jius" ND Lynnwood ND Scomman D Lystair ND Schneider b Mal C Seattle D Manley a Seklu ND Mashel B Sendahmoo D Maytown C Shalcor D Mcv.imli D Shona B McM6rMy ND Shelton C Melbounw 8 SI C Menzel ND Sinclair C Mijted,Ajiuvtai variable Skipope D Moloc" 8 SkykorW&h B Muklheo C/D SnAhopish MD "off 8 Snohondsh D N rpt A Solduc B Zionsi ND Solicits ND "elk" A Spone D FEBRUARY, 1991 I'Vi I:,.. i. dd' city, -I§ low. Effective rooting depth Is 20 to 40 4 unoff,184apid, and the hazard of water erosion seasonal perched water table Is at a depth of. Inc" has from Janua to March. Springs or seep b6hiinoh., i�!Thb Everet t 8611 Is Very deep and somewhat d b*bGbsIveIy ralned. It formed In glacial outwash. i',Tyoldally, the SuOace layer, where mixed to a depth of �i 66W 6 inches, Is Very dark grayish brown gravelly sandy 169hi-I the subsoil Is dark brown very gravelly sandy loam 0 Inches thick. The.. upper part of the substratum Id'br6wri Vety §faVelly lo * p amV sand about 5 Inches thick. r - a to i depth of 60 Inches or more Is dark t t1kieffi6ly oravelly sand. 16hrrie4bilitV of the Everett soil Is rapid. Avallabl& water 'Qk6hYAS'IC*-'15fte6tIve rooting depth Is 60 Inches or fiioid-`AUhbffI§,rspId, and the hazard of water erosion Is hiodefate I; ",� this Unit is used mainly as woodland and for wildlife �-hibfiat. It Is also Used for urban development. 'DbUglas-fit Is the main woodland speci6s'-on' the "Aiddrwood s the oil. On the basis of a 100-year site curve, m6an site Index Is 142. On the basis of a 50-year .6116 curve. the mean site Index Is 108. The mean annual 4 Increment at culmination (CMAI) for Douglas -fir at age-65, 146 cubic feet per acre. b6tiglas-fir Is the main woodland species on the bred poll. On the basis of a 100-year site curve, , 'M60,014e Index Is, i4l. On the basis of a 50-year slt��-' Wrvd,'the mean site Index Is 111. The mean annuaf-, 1p. "i6dibirrient at culmination (CMAI) for Douglas -fir at 6'(? 65 ISH 46 6ubic feet per acre. 9 mong th I a trees of limited extent on thls*unit are hemidck, Western redcedar, and red alder. A mdng t a common forest understory plants are salal, i't �4.&eroreen huckleberry, brackenfern, red huckleberry, 6omMon rose; and.Oregon-grape. fid4ill. '-,'.thd main limitation for the harvesting of timber is steepness of slope. Slope restricts the use of wheeled drid tracked equipment In skidding operations; cable .,it ardin systems generally are safer and disturb the soils lass: Narvesting systems that lift logs entirely oft the d d the disturbance of the protective layer of Nroun re uce du �il,�,`,16gging roads teoulre suitable surfacing for year-round Use. Rock for road construction is not readily available on this unit. Esta blishing plant cover on steep road cut -i and fill slopes teduces erosion. Steep yarding paths, skid trails, and firebreaks are subject to rilling and gullying unless adequate Water bars are provided or they are tected by plant cover. 'Seedling mortality Is the main limitation for the pfoduction of timber. Reforestation can be accomplished bY Planting DoUglas-fir seedlings. If seed trees are natural reforestation of cutover'Areas by red 'aidef occurs periodically. The high tem perature and low .,moisture content of the Everett soil during the growing i:-,i§eason cause high mortality of seedlings, especially Soil survey those on south- and southwest -facing slopes. When openings are made In the canopy, invading brushy plants, If not controlled, can delay the establishment of seedlings. Because the rooting depth Is restricted by a cemented pan In the Alderwood soil, trees are subject to windthrow. The main limitations of the Alderwood soil for septic tank absorption fields and homesites are steepness of slope and a seasonal perched water table. Effluent from absorption fields flows laterally above the pan and can seep. at the bottom of slopes. Drainage Is needed If buildings with basements and crawl spaces are con§tructed. This soil sloughs readily when saturated. The main limitations of the Everett soil for septic tank absorption fields are -steepness of slope and seepage. If the density of houslHo'ii'moderati to high, community sewage systems are needed to prevent contamination of water supplies as a result of seepage from onsite sewage disposal sypten1s, Road cuts tend to slough readily. . to protect the soils In this unit from erosion during construction, disturbed areas need to be seeded and runoff should be controlled. i This map unit Is In capability subclass Vile. 5-"Aldetwood.;Urban land complex, 2 to 8 percent slopesi This Map Unit Is on till plains. Areas are Irregular vih shapi§'ind are 100 to 1,000 acres In size. The native .,',4egetatlon Is mainly conifers. Elevation is 50 to 550 feet. '-The average annual precipitation Is about 40 Inches, the average annual air temperature Is about 50 degrees F, and the average frost -free season Is 170 to i9l) days. This unit Is about 60 percent Alderwood gravelly sandy loam and about 25 percent Urban land. The components of this unit are so Intricately Intermingled that It was not practical to map them separately at the scale used. Included In this unit are small areas of McKenna and Norma soils and Terric.M'edisaprists In depressional areas and drainagaways on plains. Also Included are small areas of soils that are very shallow over a hardpah4 small areas of Everett, Indianolai and Ragnar soils on terraces and butwash plains; and soils that have a stony and bouldery surface layer. Included areas make up about 15 percent of the. total acreage. The Aiderwood soil Is moderately deep over a hardpan and Is moderately well drained. It formed In glacial till. Typically, the surface layer Is very dark grayish brown gravelly sandy loam about 7 inches thick. The upper part of the subsoil Is dark yellowish brown and dark brown very gravelly sandy loam about 23 Inches thick. The lower part Is olive brown very gravelly sandy loam about 5 Inches thick., A weakly cemented hardpan is at a depth of about 35 InbOes. Depth to the hardpan ranges from 20 to 46 Inches. Petineability of the'Aiderwood soil Is moderately rapid above the hardpan and very slow through it. Available . water capacity Is low. Effective rooting depth Is 20 to 40 inches. Runoff is slow, and the hazard of water erosion County Area, Washington , lg� - slight. A seasonal perched water table is at a depth of V18 to 36 Inches from January to March. Urban land Is areas that ate covered by streets, i�bdllding6; parking lotsi and other structures that obscure .�*:Alter the -soils go that Identification Is not possible. 4,31he * Aldetw6od soil In. this unit Is used mainly for. ,'Oatks, building sites, lawns, gardens, Arid woodland. .1.jhe main limitations of the Alderwood soil for dinesites and septic tank absorption fields are the �,"deipth to thehlardpan and the seasonal. perched water Ftable: Onsite Waste disposal systems often fall or do not erly during periods of high rainfall. Drainage buildings with basements and crawl spaces 4r'e' constructed. Topsoil needs to be stockpiled during ;Ilte Oroparation and subsequently used to cover the ,.exposed material. Additions of fertilizer and peat are �deslrable prior to seeding grass for lawns. This map unit Is In capability subclass lVe. ii�—Alderwood-Urban land complex, 8 to 16.percent iwpd, � This map unit Is on till plains. Areas are irregular !.In 6ha'pe and are 25 to 100 acres in size. The native . 4 , vegetation Is mainly conifers and hardwoods. Elevation Is 60 to 550 feet. The average annual precipitation Is about f 1,40 Inches, the average annual air temperature is about -60 degrees Fj and the average frost -free season is 170 W,Vto i90 days. this -unit Is about 60 percent Alderwood gravelly sandy.. 1.. 3 *. jkliAoarn and about 25 percent Urban land. The components -,,.,of this unit are so Intricately Intermingled that It was not I - practical to map them separately at the sca ' loused. ? , , viarett and _i Included In this unit are small areas of E � Indianola soils on terraces and outwash plains, Kitsap 'soils on terraces and terrace escarpments, and Ragnar soils on outwash plains. Included areas ma e up a out jS percent of the total acreage. The Alderwood soil Is moderately deep and moderately well drained. It formed in glacial till.. Typically, the surface layer Is very dark grayish brown gravelly ,�';,"'sandy loam about 7 Inches thick. The upper part of the V�;:- iubsbil is dark yellowish brown and dark brown very gravelly sandy loam about 23 inches thick. The lower part Is olive brown very gravelly sandy loam about 5 Inches thick. A weakly cemented hardpan Is at a depth of about 35 Inches. Depth to the hardpan ranges from' 20 to 40 inches. Permeability of the Alderwood soil is moderately rapid above the hardpan and very slow through it. Available water capacity Is low. Effective rooting depth Is 20 to 40 Inches. Runoff Is slow, and the hazard of water erosion Is glight. A seasonal perched water table is at a depth of 18 to 36 Inches from January to March. i, , Urban land consists of areas that are covered by - flo streets, buildings, parking lots, and other structures that �1 obscure or alter the soils so that Identification Is not I possible. The Aiderwood soil In this unit'is used mainly for parks, building sites, lawns, and woodland. 13 The main limitations of the Alderwood soil for homesites and septic tank absorption fields are the depth to the hardpan and wetness because of the seasonal perched water table. Drainage Is needed If buildings with basements and crawl spaces are constructed. Onsite sewage di * sposal systems often fall,41. or do not function properly during periods of high rainfall. i Topsoil needs to be stockpiled during site preparation and subsequently used to cover the exposed underlying material. Additions of fertilizer and peat are desirable, prior to seeding grass for lawns. This -map unit is in capability subclass lVe. 7—Bellingham silty clay'loam. This very deep, poorly, drained soil is in depressional areas. It formed in alluvium and lacustrine sediment. Areas are regular in shape and are about 2 to 25 acres in size. The native vegetation Is mainly grass and sedges. Elevation Is 60 to 800 feet. Slooe is 0 to 3 percent. The average annual precipitation is about 45 inches, the average annual air' temperature i� about 50 degrees Fj and the average frost -free season is 160 to 180 days. . : ' . Typically, the surface layer Is very dark gray silty clay,,: loam about 9 inches thick. The subsoil to a depth of 60 inches or more is mottled, gray and olive silty clay. Included in this unit are small areas of Terric Medisap . rists, very poorly drained organic soils, Norma soils along upland drainageways, Kitsap and Pastik soils Qn terraces,l,'And Bellingham soils that have been, -0.631ned. Included areas make up about 10 percent of the - tbtal acreabe. - - I Permeability of this Bellingham soil Is slow. Available''�,J. water capAcIty is high. Effective rooting depth Is limited by a seasonal high water table that is at a depth of 0 to:.. about 12 inches from November to June. Runoff is very - slow, and the hazard of water erosion is slight. Ponding i occurs from' November to June. This unit is used for pasture, woodland, urban development, and wildlife habitat. This unit is suited to pasture if the excess water on the surface -is removed. Tile drains or open ditches can be,-,�. i used If suitable outlets are available. Grazing when the. soil in this unit Is wet results In compaction of the i, , �,' surface layer, poor tilth, and reduced Infiltration. Use of j,, proper stocking rates, pasture rotation, and restricted grazing during wet periods helps to. keep.the pasture In I , good condition. Proper grazing practices, weed control.- ti�, J and fertilizer are needed for maximurn quality of forage.'', This unit Is suited to red alder. On the basis of a 50- year site curve, the mean site Index Is 83. The mean,-. id-,, annual Increment at culmination (CMAI) for red alder atl,'l age 40 Is 89 cubic feet per acre. Among the trees of limited extent on this� unit are Douglas -fir, bigleaf maple, western redcadar, and western hemlock. Among the,. common forest understory plants are trailing blackberryj western swordfern, thimbleberry, salmonberry, and il 11 4 huckleberry. The main limitation for the harvesting of timber Is soil 1; wetness, which limits the use of equipment to dry 4C JNAI C7 LJ T, C- A kx. (DSX 16 Ir Cl) 4-7 4,r"it t ?i -- - - - - - - - - - - - - - - S.C.S. TYPE71A DISTRIBUTION 2-YEAR, 24-HOUR STORM 1.50" TOTAL PRECIP. --------------------------------------------------------------- - �.�':-,ENTER:.A(PERV)r CN(PERV), A(IMPERV), CN(IMPERV), TC FOR BASIN NO. DATA PRINT-OUT: AREMACRES) PERVIOUS IMPERVIOUS TC(MINUTES) A CN A CN ;7 .7 - 81.0 .0 A 25.0 �PEAK-,Q(CFS) T-PEAK(HRS) VOL(CU-FT) i02 8.00 820 ------------- S.C.S. TYPE-lA DISTRIBUTION 10-YEAR 24-HOUR STORM 2.00" TOTAL PRECIP. --------------------------------------------------------------------- ENTER: A(PERV), CN(PERV), A(IMPERV), CN(IMPERV), TC FOR BASIN NO. 0.72,81,0,0,25 DATA PRINT-OUT: AREMACRES) PERVIOUS A CN .7 .7 81.0 ''PEAk-Q(.CFS) T-PEAK(HRS) 8.00 IMPERVIOUS A ..CN .0. .0 VOL(CU-FT) 1575 Td(MINUTES) 25.0. - ---------- ------------------------- S.C.S. TYPE -IA DISTRIBUTION 100-YEAR 24-HOUR STORM 3.00" TOTAL PRECIP. - ---------------------------------------------------------------------- ENTER: A(PERV), CN(PERV)i A(IMPERV), CN(IMPERV), TC FOR 13ASIN NO. 0.72i8l,0,0,25 DATA PRINT -PUT: AREMACRES) PERVIOUS IMPERVIOUS TC(MINUTES) A CN A CN .7 .7 81.0 .0 .0 25.0 PEAK-Q'(CFS) T-PEAK(HRS) VOL(CU-FT) �16 7.83 3415