Loading...
21405 73RD PL W.PDFIIIIIIIIIIII 5827 21405 73RD PL W E- �MWW' c--�, C,), 15 C-- ADDRESS:221 Cz� 4 215( ') 2 t I TAX ACCOUNTIPARCEL NUMBER: 00�-�01?scocc[�50n BUILDING PERMIT (NEW STRUCTURE):20D I C6 2-5 COVENANTS (RECORDED) FOR:kM-kct WZ 2QQ I 0s D CRITICAL AREAS: DETERMINATION: El Conditional Waiver Ej Study Required V51�aiver DISCRETIONARY PERMIT #'S: DRAINAGE PLAN DATED: PARKING AGREEMENTS DATED: EASEMENT(S) RECORDED FOR: PERMITS (OTHER): IM24WcYO PLANNING DATA CHECKLIST DATED: SCALED PLOT PLAN DATED: SEWER LID FEE $: LID #: SHORT PLAT FILE:s * Is, F-,o LOT: BLOCK: SIDE SEWER AS BUILT DATED: a-z-& -�04 SIDE SEWER PERMIT(S) #: GEOTECH REPORT DATED: STREET USE / ENCROACHMENT PERMIT #: FOR: WATER METER TAP CARD DATED: L\TEMP\DSrs\Fomis\Street File Checklist.doc 0 4p ADDRESS: ,I/ �105 et 9/ 1-/Q 7 IS��' P(- lkllz,55 & ,-91,!0 7,�cA150-5- TAX ACCOUNT/PARCEL NUMBER: BUILDING PERMIT (NEW STRUCTURE): COVENANTS (RECORDED) CRITICAL AREAS: DETERMINATION: 0 Conditional Waiver F] Study Required E] Waiver DISCRETIONARY PERMIT #'S: DRAINAGE PLAN DATED: PARKING AGREEMENTS DATED: EASEMENT(S) RECORDED PERMITS (OTHER): PLANNING DATA CHECKLIST DATED: SCALED PLOT PLAN DATED: SEWER LID FEE $: SHORT PLAT FILE: SIDE SEWER AS BUILT DATED: SOILS REPORT DATED: LID LOT: BLOCK: SIDE SEWER PERMIT(S) #: STREET USE/ ENCROACHMENT PERMIT#: ()2--jqe17 --- OAIAII'A At/ 14--71 AAA J It , ) WATER METER TAP CARD DATED: OTHER: LATEMP\DSTs\Fomis\Street File Checklist.doc 1-4 C. 18 9 \3 CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 - FAX (425) 771.-0221 DEVELOPMENT SERVICES DEPARTMENT Planning - Building - Engineering November2l,2002 Hossein Ahmadnia 122 NE 158th St Seattle, Wa 98155 Re: Request for Address Change Dear Mr. Ahmadnia; GARY HAAKENSON MAYOR This letter is to inform you that your request for an address change has been granted. The old address of 21405 73m PI W is nOW 21507 73'rd PI W and 21407 73rd PI W is nOW 21505 73rd PI W. This may seem confusing at first but the numbers must get smaller as they go north SO 21507 must be south of 21505. 1 will inform all City Divisions including Fire, Police, Utility Billing, Public Works and Building. It is your responsibility to inform the Post Office, the Phone Company for Enhanced gil emergency purposes and all other interested parties of this correction. 3 Si cerely, c Y' r�aPalma *er Permit Coordinator City of Edmonds Cc: Fire Department Police Department Utility Billing Public Works Building Official/Street File L\Temp\DST's\Master Letters\Address Change Incorporated August 11, 1890 Sister City - Hekinan, Japan Nov 2 1 02 01:09p Virage Logic Carp. (425)746-869.3 0 P. 1 Nov 21, 2002 Fax: 425-771-0221 Attn: Lara Palmatier Hi Lara, I am requesting a change to the following addresses: Old Address New Address 2140573 d pl W 2150573 rl pl W 21407 73' P1 W 21507 73 �dpjW The current addresses do not correspond with the street crossing Best Regards, Hos - A4madTu'a,- ,sein W�-C— //- U-11 206-715-0747 -CEIVED 121 2002 BUILDING DEPT. -I.q C. 1 S 913 0 1 . . . q i� . 0 CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 - FAX (Q5) 771-0221 DEVELOPMENT SERVICES DEPARTMENT Planning - Building - Engineering November 21, 2002 Hossein Ahmadnia 122 NE i58th St Seattle, Wa 98155 Re: Request for Address Change Dear Mr. Ahmadnia; J. GARY HAAKENSON MAYOR This letter is to inform you that your request for an address change has been .. granted. The old address Of 21405 73rd P1 W-is nOW 21507 7*3rd P1 W and 21407 73rd P1 W is nOW 21505 73rd P1 W. This may seem confusing at first but theinumbers must get smaller as they go north SO 21507 must be south of 21505. 1 will inform all City Divisions including Fire, Police, Utility Billing, Public Works and Building. It is your responsibility to inform the Post Office, the Phone Company for Enhanced 911 emergency purposes and all other interested parties of this correction. 9 Si cer4ely,. a Pa�lma *e r Permit Coordinator City of Edmonds Cc: Fire Department Police Department Utility Billing Public Works Building Official/Street File L\TaM\DST's\Master Leaen;\Address Change Incorporated August 11, 1890 Sister City - Hekinan, Japan Nov 21 U2 UI:UZJP virage Logic Lur-pi. Nov 21, 2002 Fax- 425-771-0221 Attn: Lara Palmatier Hi Lara, I am requesting a change to the fol.lowing addresses: Old Address ' New Address 21405 73,d pl W 21505 73rd PI W 21407 73d PI W 21507 73"d PI W The current addresses do not correspond with the street crossing Best Regards, H 41,madry 206-715-0747 ED BUILDING DEPT. K'OTTF- NO WARRANTY OF ACCURACY The inforrinatic-i. cl,.r-kvn h ci t e 7j, V,= cc--mv -- fc� uze by the Go of Do, City at Edmonds does nct c-o the n, ap. Any person or entity a c I -py co to in � endent inquiry regarding t1k. injcr�j-,,=�cn c,"' c 71 bu, not limited to, the locaJon at eny may or may not e)d,-;It and m ay or rr,:.,, ncl. Neithe, the City of Edmonds ncr its ci"npIqi' z3 or Offics-i's S�42!1 ba 11L�.!aft, the information given onthis map, norfor �ny orJ rejorasew"on provided based upon said map 0 0 > z 0 * rg --A :;0 z X M 6-4 > c') 0 00 X, — ----- > 0 -n L4 0 0 . 0 0 V) 0, (D > coo 0 =r :3 0 -<;a 0 > 4S. z c� 2. 0 CL 0 CD W 0 Lo 0 'a 0 (A K: M :e 000 --1 M C D 0 (n (D z * CD (1) M cD 0 :E 0 CD 0 z -0 M (10 C) > 0 Cl� 12TH PL N M RETURN ADDRESS: City of Edmonds, City Cierk 121 5th Avenue North Edmonds, WA 98020 �c 7.77 FILE -00WORMED COPY ,2-001'08107-0284 08/07/.2001 1.2*.42'PM Snohomish P.�0002 RECORDED ' County DECLARATION OF RESTRICTIVE COVEN -ANT -MULTI-FAM-ILY RESEDENTIAL Reference #: do 0 Additional on pg. Grante6(s): CijX of Edmonds Legal Description (abbreviated): Sec—,,�L��Twn--j4.�9-21t—�Qt OR Lot --imock ]at Assessor's Tax Parcel ID#(s): _---jAssestor's Tax Parcel lD# not yet assigned WBEREAS, are the owners of the followingdescribed real estate in the City of �dmonds, to wit: Property Legal Description: # Assessor's Tax Parcel JUD W (s): - 40 000 AUTHORIZEDIFOR RECO]WING C, of.Edmonds By: Dat Page of WHEREAS, the above named owners are desirous of imposing a restrictive covenant upon said premises in compliance with -Section 19-00-040 of the Edmonds Community Development Code. WITNESSETH, t I hat for and in consideration of the premises, the above named owners do hereby declare and -grant to the City of Edmonds as Grantee the following restrictive covenant, to -;wit: That at the time of the execution of this Covenant the JGrantors have agreed to the Ordinance of the City of Edmonds provide that no building for 'multiple family housing may be erected on subject property --containing more than 12 b 4 . units. Said Covenant shall be binding upon all present and future owners of said real estate -and their heirs, successors and assigns. DATED this - day of GRANTOR GRANTOR State of Washington County of 4aok . 6) )ss I certify that I know or have satisfactory evidence that signed this instrument, on oath stated that he/she was authorized I to execute the instrument and acknowledged it as the 01 _,*� (title) of Toyfeoy_ (name of party on behalf on whom instrument wag executed) to be the free and voluntary act of such party for the uses and purposes mentions 'in this instrument. 'Subscribed and sworn to'before me this day.of Z01-Y M .......... Notary Pu Bc in and for the' State of Washington. 0 OTA#1� MW 0 -am MY commission expires�_. 0% PUBLIC C� AUTHORIZED FOR RECORDING City of Edmonds By:- �&J� Date - Page - -ca of - __ _.�_ L:X7'EMP\BUIILDING\FORMS\RES7RICT -1-11 C. i S 9 "J GARY HAAKENSON CITY OF EDMONDS MAYOR 121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 - FAX (425) 771-0221 Website: www.d.edmondsma.us DEVELOPMENT SERVICES DEPARTMENT Planning - Building - Engineering February 27, 2003 Mr. Nasser Ahmadnia 433 Ravenna Blvd Seattle, WA 98115 RE: Property at 21507 73 d Place W Dear Mr. Ahmadnia: Thank you for meeting with Lyle Chrisman and me on February 26, 2003 to discuss the concerns addressed in your letter of February 20, 2003. After discussing your concern s with you and your brother, we summarized them into three primary issues, which I would like to address as follows: 1. You feel you were sinjZled out and treated ingppropriately by Cily Engineering Division staff during the plan review and inspection of your p1pject. Your allegations that Engineer Division staff singled you out and treated you in a prejudicial and discriminatory manner are very serious allegations and are taken seriously by the City. Please be assured that it is the City's policy to treat all developers in a professional and consistent manner, as necessary to ensure compliance with applicable codes and approved plans. After reviewing your letter and your comments in our meeting, and looking into the project history, I must take exception to your allegations. Although your project had some site constraints that led to frustration for you in obtaining permit approvals, and some inspections resulted in disapproval and re -inspection, I believe our staff acted in a professional and consistent manner in our dealings with you. Nonetheless, it is clear that you are quite passionate in your perception of your treatment by Engineering Division staff. During our meeting, you agreed that there is nothing that can be done to change any past actions. However, I assured you that I will counsel our Engineering Division staff to make sure that we all have an appreciation for how our actions and procedures inay be perceived, and that we make sure that we deal with all developers in a professional, consistent, and respectful manner. 2. You believe that the Edmonds Communily Development Code (ECDC) needs to be revised so it can be uniformly and consistently applied. We agree. It has been a number of years since the ECDC has had a major update, and there are a number of areas where it could be clearer and easier to interpret. The Development Services Director had planned to undertake the significant task of a major Incorporated August 11, 1890 C'.. - � — rl!— LJ - I.: - - - I ---- code update in 2003. Unfortunately, due to significant budget cuts this year, the City Council was not able to approve the funding in the 2003 budget that the Development Services Director requested, to accomplish this task. Therefore, the best we can do for the foreseeable future is to continue to address and clarify individual issues on a case by case basis. If you can provide us specific recommendations to improve specific sections of the ECDC, that would be helpful and greatly appreciated. 3. You want City qpproval to not remove that asphalt '!parking Mace" that we have directed you to remove and replace with landscgping per the approved plans. . As we discussed, there are actually two corrections directed by Mr. Cbrisman's letter of January 24, 2003 that, as of our meeting, you had not completed. You were directed in that letter to 1) remove the block wall from the City right of way, and 2) remove the asphalt area in the front yard that could be used as a parking space and restore landscaping per the approved plans. During our meeting, you agreed to remove the block wall from the right of way. Regarding the asphalt "parking space", you explained that you do not intend this to be a parking space and that your intent is that it be a walkway extension from your previously existing sidewalk. As we agreed, you will submit a revised plan requesting City approval for a sidewalk extension in this location. I explained to you that the City's concern is that this not be later converted back to, a paved- area that could be used for parking because it does not meet City standards and would not be safe for parking a vehicle. Therefore, your revised plan must include permanent changes to the existing asphalt and features that will preclude it from being easily restored to a paved area that could be used to park a vehicle. In other words, prior to our approval, we must be assured that, for example, the landscaping cannot simply be removed again to restore the "parking space". We are always working to improve our processes and procedures, and I thank you for providing us your input. Sincerel DAVID K. GEBERT, PE City Engineer Cc: Mayor Gary Haakenson Duane Bowman, Development Services Director To: Mayor Gary Haakensons City of Edmonds To- Mr. David K. Gebert, PE City of Edmonds Dear Mr. Gebert, RECEFIV,EL) MAR 10 2003 LINGiNEEFUNG DIVISION RECEIVED MAR 0 7 2003 DEVELOPMENT SERVICES Thank you for meeting with my brother and I on February 26, 2003 to discuss the issues that I presented to you attention on my letter dated February 20, 2003. 1 will comment to same three primary issues that you summarize on your letter on February 27, 2003 below: Even though you -have assured me on your letter and during the meeting that the City Engineering Division "deal with all developers in a professional and consistent, and respective manner", this has not been my personal experience. I don't think it is helpftil to dismiss my concerns as a personal feeling and not acknowledge inconsistent or improper actions by the Engineering department staff. I still clairn that Ms. Danielle Gilbert, City Engineering Division staff Engineering inspector, has over step her authority to contact my brother and I on Feb 18 and find her comments and warning to me during that call out of line. Even though, I can't prove what she said to me over the call, I'll send you a receipt from our cell phone carriers which will show the time and phone number that her call originate from. Following her call, a notice was posted on my property from the Building department within 48 hours. Her call was a continuation of problems she presented to me over the course of her inspections. I had difficultly with all of the inspections she performed. If you review all other inspections perform on this;project, examples Building and Fire, and take the time to talk to those inspectors you'll find all those inspections we done without any difficulty. So, it is not right to dismiss the problem as project constraint but rather acknowledge there is merit to my claim and maybe Ms. Gilbert conduct through my and my project has not been proper. 2. It is interesting that the only thing you did acknowledge during our meeting is the necessity for major upgrade to ECDC code for which there are not sufficient funds at this time. What I was hoping to hear is that you'll review the engineering practices of Engineering Department. I agree the no code is perfect, however, that doesn't take a way the requirement of good engineering practice of consistent interpretation of existing code and timely response. It took well over six months and number of register letters to get an approval for the width of access road to the project. During this time, the Engineering Department insisted on requiring an extra 2 times 'shy distance' width to the 4! access road that is not in the code. It took the intervention of senior department engineer to drop this subjective requirement. 3. During the meeting we agreed to remove the block wall and we had already done that. We stated the paved asphalt area in front was not a 'parking space' as it is not big enough for this purpose. Also, we don't need to create an additional parking space since we have ample parking both on and off the property. We stated that we needed the paved area as a continuation to the paved surface to the house. You agreed. We have lined the paved area with stone blocks on both sides and added back landscaping. This should meet your concern. Please see the revised plan. Sinc/eFe/ly, a,Ss a ;17lo -3 L/33 So"-ftlk- 1-4L tical Areas Checklist 'Site Information (sdils/tdpography/hydrology/vegetation) 1. -Site Addiess'lLocatiow. 9.-3.rcl. Pt. k-D M., as r. 2. Property Tax: Acoount 57 25 000 9 Vurnbw. 01b 3- Approximate Site Size (acresor square fed): 2— 1) .4. b1his site currently. developed.? ____yes; I/ no. If yes;,how is site developed?....... 5. Describe the generalsite topography. -Check M dig apply. Flat less than 5-feet elevation change over entire site. -49. 0 C S14 ID '40 VA, 41 9SO Rolling: slopes on site generally less than 15% (a vertical rise of 10-feet over a horizontal distance of 66-fed). I illy. slopes present onsite of more than 15% and less than 30% a vertical rise' of 10 eet over a horizontal distance of 33 to 66 eet). Steep: grades of greater than 30% present on site (a vertical rise of I 9-feet over a horizontal distance of less than 33-feet). Other (please describe): 6. Site c6ntat ns areas of yea r-round standing water. A�O _;Approx. Depth: 7. Site contains areas of seasonal standing water. Approx.- Depth: What season(s) of the year? 8. Site is ii the floodway floodplain of a Qat& course- 9. Site contains a creek or an area where water flows across the grounds surface? Flows are year- round?.. Flows are seasonal? (What time of year? 10. Site is primarily: forested meadow shrubs mixed urban landscaped (lawn,shrubs etc) I I.. Obvious wedand is present on site: For City Staff Use On IF 1. Site is Zoned? Z 4 2-. SCS snapped soil type(s)? -72 - vr-bAft L&,�, 3. Wetland inventory or C—A. map indicates wedand present on site? 7,,Qitical Areas inventory orC-A.-inap indicates-C&fcal. Area on site? j 5�, within desig"nated earth subsidence landslide hazard area9 Site designated on the Environmentally Sensitive Areas MarP METERMINATIO JDYREQUIRED CONDITIONAL WAIVER --- ------- W,A VER _J 7 .,,....,Revi6w�dby;.- �—Manner Date i.Z A z s .890 - 19,4 Ci 10�6iiift X reas -:.'C- hetkftt' C116*11itt dkkitained -bn� i -Si6mit it 4ne City will to the City. this Wrin is to be filled out by any pex-son Oim the che�klistmake a precurso;� site preparing a DevelopmentTermit visit,- and make a doermination of the Application for the City of Edmonds pnor, - subsequent steps necessary to Complete a to his/her submittal.ofa. t, devd[opnientpenifit2pplication.�7,�. permit to the City. With a signed c9py of this form, the Mw purpose of- the Checklist is to enable '15howd;a][M submit a jdcinit� map City staff to determine whedw any dividuai lots of the parcel A. potential Critical Areas are or may be - - with enough detail that City staff can find presenton the subject proputy. ., Jbe�% . - In'—, � , - _.and idetifify the subject parcel(s). infox malii� - ni:� t-0 compide the additiozi, the app8cant shail include, Checklist should be easily ava-ibble from other Pertinent inforn�ation (e.& site obsenmfionsof the-siteor dati available. aif 'topigra.-i3lij niap, etc -)'or studiei in CityEW (Critical, Areas inventories, nuips. icordunction with this CIbe&ral to as�M — or soil. surveys)... Staff in Completing their preliminar*y, 1-assessinent of thesite. An applicant,'br hiAci representative', must fill out the checklist, sign anddate it, I have completed the attached Critical Area Checklist and attest that the answers provided are factual, to the best of my knowledge (fill out the appropriate column below). Owneirl Applicant: Appr"nt Representative: OALIL Kam J il Natne 7­7 Street Address Stred Addn:ss ;3TV1 Y), 'iMr' S, z 16o� city, State, ZIP Phone,-, aty, State� UP Thone V z", �7 =7- Signature x- A mature ate 4 Le !Y W 4e 4m , W- , . W . !, - W G DA ZoneG 1/4, SEC. 29' T'.27N., RA W.M. 1.57 2 M21 I . ef 00 0 vow WWII "K f1022 Von 5 7 '1 D.z,',v A V*34 "We 10 0 'elf alloy &III* too,. Ic ADIS i WMACL It K 2 C gill/ fill 59 N 44. K 21105 am ej A 4m $T &^TC . W1. 212"w ST a 00 1 title 0 la, ! a ry W1 7507 C!� Q q; N 2M20 wj SL 204 A a 1 0 zmS Lr F*A 4AO a 7303 SAa 0� � 0 21311 21117 21316 ICE p- PARV i ROG 2/310 213LT I T-1 Q L-OT 2 IK"o is zags j ., 2146S Ai mrzi3z4 4, Srow HE f4avot v7 Xon it x Al' IM, V420 1401 2j5 ST Sw 21+00 INMAOMTOO 21420 r, 2142T 21491 21429 141 21F21 0 Sw M521 21SOO 6 1527 AV 1116 A k4w Sr xaga 216" jOO 21605 zt600 Aff 21 217 A LI Ala 6 560 7—o-W17 1-10645e '0 IVew X'r7)oe1v';qu5 cerep ;'�"hc"rory 7o 7-re.07C-1,7 ="O.ji/ 3. 0 a5 r-es7—Re5j,1 r:5) ZZ - U6e des,* 7 1�7 M47/.11-1 C7 U Se 12 IM 0 0 0 6Z �3 I oto r" 12 Peale ---lo ('J.7 0. 0 q C.<S co /if X, 4 U;5e 415 /-o X14 wide dOelo Z/9' Ole 4. t(Ak'1W e4'.. I If ()-I, c tt AM. Ole -ilg"" 9/7/00 001 op's Ahmadnia Building Storm Drainage Report 2140573 rd Place West Edmonds, WA Portion of NWI/4, NW1/4, Section 2, Township 27 N. Range 4 East WM Snohomish County WA REc:s�VED MAR 2 2 2331 DEVELOPVI��'�! r,�-Rk'3CES CTR. c�TY OF EZ-1JODS iq/o( L:�--ExpjRES Table of Contents 1. Introduction/General Information 2. Existing Site Hydrology/Upstream, Downstream Consideration 3. Proposed Site Hydrology 4. Storm Draining Calculator and Supporting Document 0 0 1. Introduction/General Information The proposed project is located on lot 5, Luschen Tracts, Division No. 3, as per plat recorded in volume 17 of plats, page 87, records of Snohomish County, WA. The site address is 21405 73 rd place west Edmonds, WA. Existing site is approximately 11,520 SF. in area and contains an existing house located on west portion of site along 73 pl. west. The project site is bounded to north, south, and east by existing lots and structures ... and to the west by 73 d place west. Topography of site is sloping from.west to east with approximate relief of 8 Ft. Existing on site soil consists of gravely sandy loom and designated as hydraulic group c based on Snohomish County soil survey. The proposed project is to construct approximately 2,270 SF. of new building along with parking and drive areas. It is also required to modify the existing residential structure to provide fire access to project. i 2. Existing Site Hydrology/Upstream, Downstream Consideration Existing site consist of and 11,5 10 SF. of a parcel with and existing house along with it's paved driveway to 73rd place west. Site slopes from west to east with and an average slope of 6%. Existing ston-n run off sheet flows from west to east and percolate to ground along low portion of site along eastproperty line. There is no storm drainage conveyance downstream from site. An existing apartment complex is located to the East Side of project with no storm run-off conveyance to this parcel. There are no upstream drainage run-offs to this project site from adjacent properties. Upstream drainage basin for this project is from areas to west of 73 rd place west and 215th. SW. Storm drainage run-off from upstream areas is tight lined along 73 d place west and bypasses the project site and drains toward south. Storm drainage run-off from 73 rd place west and upstream tributary area is tight lined and drains toward 216t, St. SW. From here storm drainage system travels northerly along 216th St. SW and discharges to Haliscreek. Due to the fact tat this project does not proposes to discharge any run-off to this system, there will be no adverse impact to downstream conveyance system. 3. Proposed Site Hydrology Storm drainage conveyance and discharge system for this project is designed in the same manner to existing conditions. C & H Design performed a percolation test based on King County surface water design manual and the result is included within this report. The average measured percolation rate has been used with a factor of safety of 2 to size the infiltration system. The storm drainage infiltration system is designed for 100yr/24hr design using SBUH methodology and storm water management manual guide line. Please prefer to the enclosed calculation. 0 4. Storm Drainage Calculation and Supporting Documents .2/4/00- 4:5:12 pm Shareware Release page NASSER TOWNHOUSE STORM DRINAGE CALCULATION BASIN SUMMARY BASIN ID: Al NAME: 100YR/24HR POST-DEV. SBUH METHODOLOGY TOTAL AREA ....... : 0.14 Acres BASEFLOWS: 0.00 cfs RAINFALL TYPE .... : TYPE1A PERV IMP PRECIPITATION .... : 3.00 inches AREA..: 0.00 Acres 0.14 Acres TIME INTERVAL .... : 10.00 min CN .... : 0.00 98.00 TC .... : 0.00 min 6.30 min ABSTRACTION COEFF: 0.20 PEAK RATE: 0.09 cfs VOL: 0.03 Ac-ft TIME: 480 min 2/4/00 4:5:13 pm Shareware Release page 2 NASSER TOWNHOUSE STORM DRINAGE CALCULATION HYDROGRAPH SUMMARY PEAK TIME VOLUME HYD RUNOFF OF OF Contrib NUM RATE PEAK HYDRO Area cfs min. cf\AcFt Acres 1 0.021 340 1407 cf 0.14 2/4/'Ob 4:5:14 pm Shareware Release page 3 NASSER TOWNHOUSE STORM DRINAGE CALCULATION STORAGE STRUCTURE LIST STORAGE LIST ID No. 1 Description: 45X4X4 FEET TRENCH 2/4/00 4:5:15 pm Shareware Release page 4 NASSER TOWNHOUSE STORM DRINAGE CALCULATION STAGE STORAGE TABLE CUSTOM STORAGE ID No. 1 Description: 45X4X4 FEET TRENCH STAGE < ---- STORAGE ---- > STAGE < ---- STORAGE ---- > STAGE < ---- STORAGE ---- > STAGE < ---- STORAGE ---- > (ft) --- ..... --�= Cf--- ..... --AC-Ft- = ... =--- (ft) --- Cf --- .... -- AC -Ft- (ft) ---Cf--- --AC-Ft- (ft) --- Cf--- --AC-Ft- 84.00 0.0000 0.0000 85.30 78-000 0.0018 .... ==== 86.60 .......... 156.00 =--= 0.0036 .... - .... 67.90 =.== ..... 234.00 = ...... 0.0054 84.10 6.0000 0.0001 85.40 84.000 0.0019 86.70 162.00 0.0037 88.00 240.00 0.0055 84.20 12.000 0.0003 85.50 90-000 0.0021 86.80 168.00 0.0039 88.10 246.00 0.0056 84.30 18.000 0.0004 85.60 96.000 0.0022 86.90 17 4.00 0.0040 88.20 252.00 0.0058 84.40 24.000 0.0006 85.70 102.00 0.0023 87.00 180. 00 0.0041 88.30 258.00 0.0059 84.50 30.000 0.0007 85.80 108-00 0.0025 87.10 186.00 .0.0043 88.40 264.00 0.0061 84.60 36.000 0.0008 85.90 114.00 0.0026 87.20 192.00 0.0044 88.50 270.00 6.0062 84.70 42.000 0.0010 86.00 120.00 0.0028 87.30 198.00 0.0045 88.60 276.00 0.0063 84.80 48.000 0.0011 86.10 126.00 0.0029 87.40 204.00 0.0047 88.70 282.00 0.0065 84.90 54.000 0.0012 86.20 132.00 0.0030 87.50 210.00 0.0048 88.80 288.00 0.0066 85.00 60.000 0.0014 86.30 138.00 0.0032 87.60 216.00 0.0050 88.90 294.00 0.0067 85.10 66.000 0.0015 86.40 144.00 0.0033 87.70 222.00 0.0051 89.00 300.00 0.0069 85.20 72.000 0.0017 86.50 150.00 0.0034 87.80 228.00 0.0052 89.00 300.00 0.0069 vu 2/4/00 4:5:16 pm Shareware Release page 5 NASSER TOWNHOUSE STORM DRINAGE CALCULATION DISCHARGE STRUCTURE LIST DISCHARGE LIST ID No. 1 Description: INFILTRATION �/4/00 4:5:17 pm Shareware Release page 6 NASSER TOWNHOUSE STORM DRINAGE CALCULATION STAGE DISCHARGE TABLE DISCHARGE LIST ID No.. 1 Description: INFILTRATION STAGE <--DISCHARGE --- > STAGE <--DISCHARGE --- > STAGE <--DISCHARGE --- > STAGE <--DISCHARGE --- > (ft) --- CfS -- ------- (ft) --- cfs -- ------- (ft) --- cfe -- ------- (ft) --- CfS -- ------- ............ 84.00 0.0210 =-.-;; ---- .30 = ------- 0.0210 -------------------- 86.60 0.0210 -------- 87.90 === --- = --- ==== ----- 0.0210 84.10 0.0210 85.40 0.0210 86.70 0.0210 88.00 0.0210 84.20 0.0210 85.50 0.0210 86.80 0.0210 88.10 0.0210 84.30 0.0210 85.60 0.0210 86.96 0.0210 88.20 0.0210 84.40 0.0210 85.70 0.0210 87.00 0.0210 88.30 0.0210 84.50 0.0210 85.80 0.0210 87.10 0.0210 .88.40 0.0210 84.60 0.0210 85.90 0.0210 87.20 0.0210 88.50 0.0210 84.70 0.0210 86.00 0.0210 87.30 0.0210 88.60 0.0210 84.80 0.0210 86.10 0.0210 87.40 0.0210 88.70 0.0210 84.90 0.0210 86.20, 0.0210 87.50 0.0210 88.80 0.0210 85.00 0.0210 86.30 0.0210 87.60 0.0210 88.90 0.0210 85.10 0.0210 86.40 0.0210 87.70 0.0210 89.00 0.0210 85.20 0.0210 86.50 0.0210 87.80 0.0210 89.00 0.0210 2'/4/b6 .4:5:21 pm Shareware Release page 7 NASSER TOWNHOUSE STORM DRINAGE CALCULATION ,LEVEL POOL TABLE SUMMARY MATCH INFLOW -STO- -DIS- c-PEAK-> OUTFLOW STORAGE < -------- DESCRIPTION� -------- > (Cfs) (CfS) --id- --id- <-STAGE> id (CfS) VOL (Cf) ...... = ... = ........... ==­ ....... = ............... — ........ = ............. — .... =..=. 100YR/24HR ROUTING ........... 0.00 0.09 1 1 88.09 1 0.02 245.25 cf ILI PrG KING. COUNTY, WASONGTON, SURFACE WATLODESIGN MANUAL FIGURE 4SIB ROOF DOWNSPOUT INFILTRA17ION SYMM PLAN VIEW NO SCALE OBSERVATION PIPE 4" RIGID OR'lr FLEXIBLE - - - - - - - - - - - PERFORATED PIPE - - - - - - - - - - - - - - - - - ROOF DRAIN SUMP INFILTRnON TRENCH W/SOLID LID PROFILE VIEW NO SCALE OVEF OBSERVATI . ON PIPE-\ RIGID OR Gr FLEXIBLE SPLASH 8 / PERFORATED PIPE - - - - - - - - - - - - - t/ K� 1: MIN 5.0' MIN .0 WASHED ROC. I 91-N FIN'E MESH CB MP W/ SCREEN SOAULID -VARIES -10' MIN-J OBSERVATION PIPE 4-tr WC-PERF PIPE COMPACT BACKFILL 4C RIGID OR Ir FLEXIBLE I;. J-�=PERFORATED PIPE 24'--J SECTION A NO SCALE WASHED ROCK I ll:r-31,C WRAP GRAVEL ENTIRELY WITH FILTER FABRIC 4.5.1-5 11/94 Proj Tax account I OW C9 (4� - �-T '13k. -::::- -, � 11 -315--76 ve 0- t-7� 5 la 4 t-3 SOIL F'R'OFI LE 3 tzX, 2. 3. 0 -5-6 " .6 L4 - 4 77 4. 5. I 35-73 - 7'3 ? 7 0 T-�Jt t. A)oy4k' 3til 14� �U Q� W Ew—fl F "AC wze-1 *4t:*40— r4r,,, p Qj R a EV OW JAZ VIM F —aEe R1 V) SM !9 ;0 ow C14 m4t vi 'Z� MW Me F; exz 14; 04 ko, Wz--*& NU WARRANTY OF ACCURACY. The information shown on th�� at( hed map was compiled for use by the City of Edmonds, its employee:-, 8 tconsultants. The City of Edmonds does not warrant the accuracy oj anything set forth on the map. Any Person of entity requesting a coot, ~tkn J0 86-t yj should conduct an independent inquiry regarding the information showr'. '01'. tne map, including but not limited to, the location of any sewer Q-1"lown. Such sewer'stubs may Or may not exist and may or may nci the location shown. Neither the City of Edmonds not its —'200 Uf�:',QrS Shiall hij liah'Q fq� 111MV111141LIU11 Ylven of) this mall, fluf lut ��i% "fovided hal:ed !:Q(M SPA rnnn VON soll 'Alkv, LYNj4WOOD 32 20 1� All. tot 7M -39 78 28 04 -0 5 5 QN; lTakACF 34 ...- 4�4 il 78 2 i� Tlk A a JAI 4-N, 4 VA RN 7 Soil survey TABLE 15.--WATER FEATURES --Continued High water table 3logicl 1 1 .3u P Frequency 1 Duration 1 Months 1 Depth 1 Kind I Months lRare ------------ 1 I 1 Ft 2.0-4.0 lApparent 1 Nov -Apr 3 'Rare ------------ 1 >6.0 :Rare ------------ 1 2.0-3.0 lApparent Nov-Apr,�' lNone ------------ 1 I I Is 1 1.5-3.0 I'Perched I Nov_M4'_ lNone ------------ 1 1 1.5-3.0 lPerched I Nov -ma lHone ----------- I I >6.o 1 17 lNone� ------------ 1 1 1.5-3.0 lPerched Nov.4 lRone ------------- 1 1 >6.o lNone------; ------ 1 1.0-3.0 lPerched lio- O'No'ne ----- ------ I I >6.o Snohomish County Area, Washington TABLE 16—SOIL FEATURES [The symbol > means more than. Absence of an entry indicates that the feature is not a concern3 Soil name a?d map symbo 1E Lemented I :12, E 111:!t!ice__T________r D th pan I ____ __ *_�� a 1 R13 �EC 0 r r 0 �si 0 n ep Hardness 1, Potential, - I i 'Initial: Tot', 11 �i �IDepth 'Hardnp-q-Q frost !Uncoatpd 3 ----------------- It >60 I An 61 Alderwood 20-40 1Thi 40: Alderwood -------------- i >60 20-40 IThii Everett ---------------- >60 5*, Alderwood -------------- >60 I 1 20-40 'Thin Urban land. I I I 7 ----------------------- Bellingham 1 I I >60 ----------------------- >60 Bellingham Variant 9 10, 11 ------- a ---- C theart >60 120. S Cryohemists 3 ---------------------- C t 1 3 er >60 . C., A4 ---------------- ; -------- -"'.Elwell I I >6o 20-40 IThin I I I ""Elwell --------------- I I .., . --I I >6o 1 26-'40 IThin lomount_�--� ------------ I I 1 20-40 lHard I --------------- ,;Iwell 1 I >60 1 20-40- IThin ,_19mount --------------- I 1 1 20-40 lHaed 1GGk outcrop. 18, 19-------------- 1 >60 I-. Iverett 1 FlUvaquents ------------- 0 chell ------- 1 >60 1 20-40 'Thin ILow -------- Moderate !Moderate. f I I I I --- ILow ------ Noderate !Moderate. --- JLow____ --!Moderate IModerate. [Low ------ Noderate Noderate. --- Mow ------ !High ----- lHoderate. 1 11 Migh ----- IHigh-----IHlgh. I I I 'Low ------ [High ----- lHoderate. Mow ------ Noderate lHigh. I. I I I I I lH1gh-___lH1gh-____lH1gh. --- iHigh-____lHigh--___lHigh. I I I --- lModerate lH1gh--___lH1gh. I I I I I I lHigh ----- 'High� ---- lHigh. f I I . I [Moderate 1HIgh ----- lHigh. lLow ------ lModerate IModerate. Nigh ----- !High ----- Migh. I son TABLE 15.--WATER FEATURES-��ontinued 00 n Irologief High -water tab troup Frequency Duration I Months I Dapth,.. .1 Kind'.." Mont �A c 1 1.5-3-0: IPerched;. -A I None -- — -------- I 1 >6.0 'C' I None—"--., 1 .1 .5-3.5-,IPerched C"- I I 5�4 G'A Peiched-,'- ,A �X -'77 C- ­i .0. "I.: 1.5m-2.5�A?erched p'k >6.0 -+1-0.5:IP' f -77 -erched 4, v. :JAPparent:*�,��,,,,:j 7V A V -0 .0 +1-1.0 JApparent A­ 1, +1_1 .0� JApparent - Snohomish COUntY Area. Washington TABLE,I'5':.-`-VATE!R FEATURES-m-Contlnu ed.� 'r-Looging �§olf'name'_and 1w y a. rolo + g161 :High water table -V map symbol group I -Frequency_­�A_. Duration I Months I :Depth.- I KI ad. I Months 430: i Ft Olomount c I 1.5-3-5.lPerched I Nov -may Elwell--"--. -C INone ----- — -- 4 Parched: 1. Xoi�-Jun Rook oute-rop. D Greas INone nt PPare LRdii-Mar C P­ :030 INone -------- -3.0' -may Peebbed Nov 469- A-, c C" -De ' c-May Rock - ou tcrop-. A 4 7; 48, �49 - Pastlk'-� A None­m :,A �J-.S'��.5. Peiched., 'Pilchuck;.+ fFrequent' JUing -4o"A ri 1 0� p Apparent-:__�"_J_ %Novj!�Apr.. Pits -C A None"�-er -ched': ov may�- Pofchu&�"�� artni .C. c T'--5 -3.'0" Feridhed�'-' ortn .1,.5-3 Perc .c eqc*ikc rop uget O�4. 0 IAOp;ar 6nt I -'Ndv-Apr --- — ------------ 1� B Ikire uyallup., I >6.o 58---­;--� ------------ .,A agnar fxone� ------------ "I 1 >6.,o t "t VkH '4, 1 nt r W, t ,k, W z R77 �;.z u n mg RNi RD, No . ......... CAI - Win �pklicATION ............ SEWER FERMT EASEMENT No. SIME s IN AIRS 0 0U!j, IDE [I SIDE [I JtEF NO PERMYT I R CONTRACTO ....................... ............ 'T 13LOCK No . ......................... ..................... ST .................... .......... .. ..................... AVENUE LADT No. .... .... .............. ... . .......... ............... ........... ........... . .... . ........ bf� . ......................... -:-HOUSt'l D. . - . , 4,11— NAME AD ....... 't- tr-.77 3-4 X k- T_ — , , o 1 '77 a ;3 STOW ADDRESS FILE"' ME APPROVED 4_6 uG 24 1964 U G 11 . .............. ............ 01, A pproved: Date �'DEPOSIT, $ ............ ........ ................... .. .J:4, .................... . ............. . m pt ow Rld Z71 APPLICA [ON CARD No. ........................... ........ lor E SEIVER PERNUT n SIOD EASEMENT No . ...................................... .-4, OUTSTDE D INSIDE Ej REPAIRS 0 4 No R ..... ...... ............ CONTRACTO ...... ... - — --------------------- 'TREET BWCKNo . ............................................... 'LVENUE LOT No . ............................................................ ......... -ic ......... K— �f/' p f" -i�' No.. ................ o�",hg NAME ADD . ............................... —'t ............................................................................................ .......................... ;' � tl �kz� I f,Ve e v. Al STREET ADDRESS FILE Date Approved: ACKF........................ iij, WO�k Ond ISSUE][ ....... ..... DEPOSIT, $ .............. NYPRK 01��,RJSSUED ............. 7- pow'' lip z z 0 6 - z z z (L 0 Z U: 0 0 Z 0 > U U2 '� Z 0 tN M c LU 0 nq >; z NOTICE- NO WARRANTY OF ACCURACY The. jnf0rm,,t!vl '7�',vn c.1 the Fl,"P wa�: ccf"446 fc;- Me by thc'.' City of Edmc--: Th3 CitY of Edmonds does c's not wzrm:�,� of forth or, the map, Any person or entity F-9 i[ldcpendent Inquiry regarding the inf c.-;y bw not limited to, the I o c a t i S� ' o n o tuil3maYormaynotodstandma c rrr--.yr:tc, Nciftiller the City of Edmonds n cl�'a�l bu liablj fol the information Et or giv" 1w rcP,rzsell �akfj Provided based upon sald w I nor for any ord cn 0 r oL =7 A? P'i 0 60� Vl 0 A4 U2 M Ul 0 0 0 0 U2 CITY OF EDMONDS Call pRospect 6-1107 when work CIVIC CENTER —WATEWSEWER DEPARTMENT is ready for Inspection. (No WPM- tio. Saturday, Sunday or holidays.) N2 1159 WE SEWER PERMIT 851 - 27th P1 ................................ ......................................... ..................... ............ ADDR&S --------- ------------ --------------------------------- i�kqe South . ................... -- ....... CONTRACTOR..N.orth-End .. 5.ePtic ... TAIXk .. CO-$ ----------- OWAUNER ........ RQb-er.t.-1----H11,&'ff-S ---------------------------- --- ------ -- 407-1 24 ........... 19-.6.4-, for ---------------------- days, to REPAIR or CONNECT a side Sewer PeANIZon is granted --- - --- AU9USt ----- rdinances. 10 Sewers in accordance with application on file and governing o W1114i'llity APONTION IS CALLED TO THE FOLLOWING: obtain a permit to construct sewer inside Property line. A licensed Side sewer contract r must NOTE No. I —The owners of the property may street area- Do not cover any portion of sewer before it has been inspected. be employed to construct side sewer in NOTE No. L 2--Obtain full information regarding Ordinance 11.16.030 and Regulations governing side sewers when You get Permit NOTA No. 3—Top of side sewer must have at least 30 inches coverage at property line and 12 inches inside Property line; minimum grade of 2%. No bends in grade sharper than % will be permitted. NOTE No. 4—Trenches in street must he water settled and surface of street restored to original condition. Contractors shall be responsible for failure due to improper work which may develop within one year of completion. k than is provided for In the permit, or to do any work on the main sewer or Its aP NOTE No. 5--It is unlawful to alter or do any other wor purtenances except to insert the pipe into the wye. 0 Io C. 1 S) 11 CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 - FAX (425) 771-0221 Website: wwwdedmondsma.us DEVELOPMENT SERVICES DEPARTMENT Planning - Building - Engineering September 1, 2004 Mr. Hossein Ahmadnia 433 NE Ravenna Blvd Seattle, WA 98115 RE: Property at 21507 73 d Place W, Non -Compliant Parking Space Dear Mr. Ahmadnia: swc)'6 GARY HAAKENSON MAYOR This is in response to your letter dated August 27, 2004. On August 11, 2004, 1 personally observed the vehicle parking in the asphalt area in the front of your property at 2150773 d Place West while I happened to be passing through your neighborhood for another purpose. Not only did I observe the parked vehicle, but I also observed that the approved 6 foot wide asphalt walkway had been widened to well over the approved 6 foot width by removing some of the landscaping, relocating the concrete blocks, and exposing additional asphalt. As a result, my letter dated August 12, 2004 directed you to correct the situation. Your letter indicates that, as of August 27, 2004, the asphalt had. been removed. However, at that time, the extent of the asphalt removed was insufficient, the remaining asphalt was still in excess of 8 feet wide, and the concrete blocks needed to be relocated after completion of the additional asphalt removal. Lyle Chrisman and I both spoke to Mr. Hauck on August 27 and explained the additional asphalt removal required and the extent to which the blocks needed to be relocated. The voice mail that you left for me on August 27, 2004 did not leave a phone number. I tried to call you on the phone number we had on file, but it appeared to be a fax number. So, I sent the enclosed e-mail to respond to your voice mail. On Monday morning, August 30, 2004,. Lyle and I inspected the walkway and determined that additional asphalt had been removed over the weekend, and that the extent of asphalt removal and relocation of concrete blocks was acceptable. The enclosed photographs indicate the approved width of walkway asphalt and location of concrete blocks. As indicated in these photographs, which were taken on September 1, 2004, the restoration of landscaping remains to be completed. However, since the asphalt width has been reduced to the approved 6 foot width and the concrete blocks have been relocated, we do not intend to pursue enforcement action, civil fines or penalties at this time. Incorporated August 11, 1890 T T I - If you have any questions, please call Lyle Chrisman or me at 425 7710220. Sincerely, D K GEBERT, PE City Engineer Cc: Duane Bowman, Development Services Director Jeannine Graf, Building Official Lyle Chrisman, Engineering Program Manager Steve Bullock, Senior Planner Mike Thies, Code Enforcement Gebert, David From: Gebert, David Sent: Friday, August 27, 2004 1:12 PM To: I ahmadnia@yahoo.com' Cc: Chrisman, Lyie Subject: Walkway/parking at 21507 73rd PL W Mr. Ahmadnia, I received your voice mail today, but you did not leave me a phone number for me to return your call. I was with Lyle this morning when he inspected the walkway in front of your property at 21507 73rd PI W. Although some of the asphalt walkway has been removed, not enough has been removed to comply with our directions. Please refer to my letter dated August 12, 2004, which states that..."you must physically remove any asphalt that exceeds the approved 6 foot walkway width and restore the concrete blocks and landscaping to a permanent configuration that precludes the area from being easily changed back again to a parking space. In addition, ....the concrete blocks lining the 6 foot walkway must be outside the City right-of-way." During our inspection this morning, we observed that the width of the asphalt is still in excess of 8 feet wide. It must be no wider that 6 feet wide. Any asphalt that exceeds 6 feet in width must be removed. Dave Gebert City Engineer CA GARY HAAKENSON CITY OF EDMONDS MAYOR 121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 FAX (425) 771-0221 Website: ww,�tb.edmondsma.us DEVELOPMENT SERVICES DEPARTMENT 467 Planning - Building - Engineering August 12, 2004 Mr. Nasser Ahmadnia 433 NE Ravenna Blvd Seattle, WA 98115 ' RE: Property at 2i�07_73'd_ P - lace W, Tqon-Compliant Parking Space. kc- Dear Mr. Ahmadnia: On August 11, 2004, we observed a vehicle parked in a non -compliant parking space on your property at 21507 73rd Place West in Edmonds. Please see the enclosed photograph. On March 3, 2003, you were issued a correction notice for your development project at this location pertaining to the asphalt area in the front yard that, if left in its configuration at that time, could have been used as a non -compliant parking space. The correction notice required that you submit a revised plan requesting City approval for a walkway extension from the previously existing sidewalk or remove the asphalt area in the front yard that could be used as a non -compliant parking space, and restore landscaping per the approved plans. On March 7, 2003 we received a revised plan from you showing a 6 foot wide asphalt walkway extending from your previously existing concrete sidewalk to the new asphalt driveway on the south side of your property. My letter to you dated March 12, 2003 advised you that, although the configuration of the proposed asphalt walkway was acceptable, we could not approve it because you had not addressed the City's concern identified to you in previgus correspondence, specifically: ".'..the City's concern is that this not be later converted back to a paved area that could be used for parking because it does not meet City standards and would not be safe for parking a vehicle. Therefore, your revised plan must include permanent changes to the existing asphalt and features that will preclude it from being easily restored to a paved area that could be used to park a vehicle. In other words, prior to our approval, we must be assured that, for example, the landscapi ng cannot simply be removed again to restore the 'parking space'." Your letter dated March 18, 2004 stated that "...the area in question was never intended to be a parking stall and was never used for parking." You further stated that the City "...can continue to monitor for changes and issue a violation if we make any changes. . Incorporated August 11, 1890 .qiqfor r.ifii - t4olzinAn JAnAn The changes that I had made cannot easily be undone and you have my assurance that no changes will be made following your approval of current plan." Based upon your written assurances that no changes would be made from the'revised plan submitted with your letter of March 7, 2003 subsequent to our approval, and that your proposed plan would be'pennanent, my letter dated March 25, 2003 approved your proposed 6 foot wide asphalt walkway, lined with concrete block units and extending from your previously existing concrete sidewalk to the new asphalt driveway on the south side of your property. Unfortunately, as noted above, we have now observed that your approved plan has indeed been changed and the asphalt area in question is now, in fact, being used for a parking space. This parking space does not meet City standards and is not safe for parking a vehicle. Accordingly, we have no choice but to direct you to restore this area to the 6 foot Wide walkway as approved by my letter,dated March 25, 2003. In restoring the area to the approved walkway configuration, you must physically remove any asphalt that exceeds the approved 6 foot walkway width and restore the concrete blocks and landscaping to a permanent configuration that precludes this area from being easily changed back again to a parking space. In addition, I must remind you that the concrete blocks lining the 6 foot walkway must be outside the City right-of-way. You must complete the work to restore this area to the approved 6 foot wide Walkway configuration by Friday, August 27, 2004. If you do not complete the directed restoration by that date, the City will pursue enforcement action, which may include but not be limited to civil fines and penalties. If you have any questions, please call Lyle Chrisman or me at 425 7710220. Sincerely, DAVID K. GEBERT, PE City Engineer Cc: Duane Bowman, Development Services Director Jeannine Graf, Building Official Lyle Chrisman, Engineering Program Manager Steve Bullock, Senior Planner Mike Thies, Code Enforcement '177 Air >7 - �Jdloo^ -,PC. i S9,3 AD CITY OF EPMONDS 121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 - FAX (425) 771-0221 I Website: www.d.edmondsma.us DEVELOPMENT SERVICES DEPARTMENT Planning - Building - Engineering November 17, 2003 Mr. Nasser Ahmadnia 433 Ravenna Blvd Seattle, WA 98115 RE: Property at 21507 73 d Place W GARY HAAKENSON MAYOR The City of Edmonds, Engineering Division, has been advised by our Public Works Department that a water valve installed with the development of this property was buried in the sidewalk. The water valve was installed by the City of Edmonds at the time individual water services were provided to the lot. The sidewalk was subsequently constructed over the water valve by your development project. The water valve must be accessible and operational at all times. The City is requesting that you expose the water valve and raise it to the grade of the sidewalk. You will be required to remove the panel of sidewalk in which the water valve falls and then re -pour the concrete Sidewalk panel once complete. The City of Edmonds Public Works Department has marked the approximate location of this valve in blue spray paint on the sidewalk. Please bring the water valve to grade or provide the City with a reasonable timeframe in which the work has been scheduled to be complete, by December 18, 2003. If the work is not complete as specified, the Public Works Department will be forced to perforrn the work and you will be billed accordingly for time and materials, or the City will attach your bond. I Your cooperation in bringing the water valve to grade so it is accessible is appreciated. Please feel free to contact me at 425-771-0220, ext 1328 with any questions you may have. Sincerely, N Jeanie McConnell Engineering Technician jrn c: ott Highland treet file 1/1!c Incorporated August 11, 1890 14 C. 18,9 ", \--G M CITY OF EDMONDS Ai 17 GAPY HAAKENSON MAYOR 121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 - FAX (425) 771-0221 Website: wwici.edmondsma.us DEVELOPMENT SERVICES DEPARTMENT Planning - Building - Engineering March 25, 2003 Mr. Nasser Ahmadnia 433 NE Ravenna Blvd Seattle, WA 98115 RE: Property at 21507 73 d Place W Dear Mr. Ahmadnia: We have received your letter dated March 18, 2003. First, let me clarify that, during our meeting on February 26, 2003, 1 did not agree that the paved area did not have to be removed. What we did agree was that you would submit revised plans requesting City approval of a sidewalk extension in this location. I also advised you that your revised plan must include permanent changes to the existing asphalt and features that will preclude it from being easily restored to a paved area that could be used to park a vehicle; in other words, that prior to our approval, we must be assured that, for example, the landscaping cannot simply be removed again to restore the "parking space". We do not agree that your revised plan meets these criteria. Although the concrete blocks which you have placed on top of the asphalt pavement to delineate a walkway may be heavy, they can still be removed without difficulty to once again expose the paved area that is now covered by the blocks and landscaping bark. However, based upon your written assurances that no changes will be made from the revised plan submitted with your letter of March 7, 2003 subsequent to our approval, and that your proposed plan will be permanent, your proposed 6 foot wide asphalt walkway, lined with concrete block units and extending from your previously existing concrete sidewalk to the new asphalt driveway on the south side of your property, is approved. DA-WD K. GEBERT, PE City Engineer Cc: Duane Bowman, Development Services Director Jeannine Graf, Building Official Steve Bullock, Senior Planner Incorporated August 11, 1890 Date: March 18, 2003 From: Nasser Ahmadnia To: David Gebe rt City of Edmonds 121 5' Ave North Edmonds, WA 98020 Cc: Development Services Department Permit Coordinator 1215' Ave North Edmonds, WA 98020 Re: 21505 73rd P1. W, Edmonds Dear Mr. Gebert: 4/1 A%P? C-I'646 4?99J This is a reply to your letter dated March 12, 2003. 1 am currently out of United States and will return on April 28, 2003. 1 am sending you this response via email and will also send it to my nephew and ask him to mail you a copy of this letter via register mail. On March 7, 1 delivered a letter along with a revised plan for the area in question. As we had agreed in our meeting the wall along the sidewalk was removed. You had agreed that the paved area did not have to be removed as we stressed the need to have a paved access to the existing walkway to the house. The plan I submitted, and the modification to the area, shows a paved pathway lined with over 40 stoned blocks (50 lb each) that is six feet wide and twelve feet long. The existing pathway is not big enough for parking stall. In my plan, I forgot to highlight the length of the pathway. I stress again, the area in question was never intended to be a parking stall and was never used for parking. The length of the pathway (12 feet) prohibits it to be use as a parking stall. Also, the changes that I made will make it very difficult for anyone to park there. You can continue to monitor for changes and issue a violation if we make any changes. Other than that, I am not sure that I can offer to do. The changes that I had made cannot easily be undone and you have my assurance that no changes will be made following your approval of current plan. Given the level of difficulty with this project, I feel that'some good faith on your part is prudent Since I am currently out of state, please forward your reply via email to the following email area: . If any action is required, please keep in mind that I will not be back in United alunadnia0).vahoo.com States until April 28, 2003. Sincerely yours, Nasser Ahmadma. Page 1,of 2 Graf, Jeannine From: Gebert, David Sent: Friday, March 21, 2003 4:45 PM To: Bowman, Duane; Bullock, Steve; Graf, Jeannine; Chrisman, Lyle; Gilbert, Danielle Subject: FW: Order to Correct Violation Attached, for info, is the Nasser Ahmadnia letter to which my draft responds. Have a great weekend. Dave ----- Original Message�---- From: Nasser Ahmadnia (mailto:ahmadnia@yahoo.com] Sent: Wednesday, March 19, 2003 12:52 AM To: Gebert, David Subject: Re: Order to Correct Violation Mr. Gebert, I am currently out of United States and will return on April 28, 2003. 1 have attached a lette . r to' this email as a reply to your letter on March 12. -Please acknowledge receipt of this email via areply. Sincerely, Nasser Ahmadnia "Gebert, David" <Geber1@cLedmonds.waus> wrote: Mr. Ahmadnia, You will be receiving in the mail an Order to Correct Violation (OTC) dated March 10, 2003. Please disregard it. It was issued in error and has been cancelled. The Building Official issued the OTC because we were not aware at the time that you had submitted a revised plan. When you brought in your revised plans on Friday March 7, 2003, you gave it to the receptionist and did not indicate that it was a revised submittal. Therefore, it was not submitted to the Permit Coordinators who are responsible for tracking all permit actions. Thus, neither the Building Official nor I were aware that you had submitted your revised plans until after the OTC was issued. We apologize for any confusion. We will review your revised plan and'provide you a response. Dave Gebert City Engineer City of Edmonds Do you Yahoo!? 3/21/2003 100. CITY OF EDMONDS 121 5TH AVENUE NORTH , EDMONDS, WA 98020 - (425) 771-0220 FAX (425) 771-0221 Website: www.d.edmondsma.us DEVELOPMENT SERVICES DEPARTMENT Planning - Building - Engineering March 12,2003 Mr. Nasser Ahmadnia 433 NE Ravenna.Blvd Seattle, WA 98115 RE: Property at 21507 73"d Place W Dear Mr. Ahmadnia: GARY HAAKENSON MAYOR We have received your letter dated February 7, 2003. We believe you intended to date your letter March 7, 2003, because it was received in our Development Services Department on March 7, 2003 and in our Engineering Division on March 10, 2003., The' following is our response to the three specific numbered items in your letter: 1. My letter of February 27, 2003 responded to this item. In that letter I advised you of the action I intend to take. I have no further response. 2. My letter -of February 27, 2003 responded to this item. I have not further response. 3. We have reviewed the revised plan submitted with your letter for a 6 foot wide asphalt walkway extending from your existing concrete sidewalk to the new asphalt driveway on the south side of your property. The configuration of the proposed asphalt walkway is acceptable. However, we cannot yet approve it because your submittal does -not address the City's concern identified in my letter to you of February 27, 2003. Specifically, my letter stated that: "...the City's concern is that this not be later converted back to a paved area that could be used for parking because it does not meet City standards and would not be safe for parking a vehicle. Therefore, your revised plan must include permanent changes to the existing asphalt and features that will preclude it from being easily restored to a paved area that could be used to park a vehicle. In other words, prior to our approval, we must be assured that, for example, the landscaping cannot simply be removed again to restore the 'parking space'." Please submit, by * explanation of how your revised plan provides the C!tysuc#as"sur"anc1e's'&P Incorporated August 11, 1*890 The deadline for completion of the actions required by the Correction Notice issued on March 3, 2003, is hereby extended to March 21, 2003. Failure to respond by this date may result in issuance of an Order to Correct Violation. When you bring your submittal in to City Hall, please be sure to submit it to a Development Services Department Permit Coordinator so that it will be properly received and tracked for plan review. Sincerely, DAVID K GEBERT, PE City -Engineer Cc: Duane Bowman, Development Services Director Jeannine Graf, Building Official Steve Bullock, Senior Planner 0 NOTIC TO PERMITTEE AND/OR OWNER DO NOT REMOVE PARTIAL APPROVAL 0 CORRECTON REQUIRED ENFORCEMENT VIOLATION Owner �su, A6M (A A 011 C^_ Permit Number Job Address— Site Contact WORK DESCRIBED BELOW HAS BEEN INSPECTED AND IS APPROVED APPROVED PLANS AND JOB CARD MUST BE AVAILABLE TO INSPECTOR ON SITE CORRECTIONS LISTED BELOW MUST BE MADE: BEFORE WORK CAN BE APPROVED AND/OR THE NEXT PHASE OF WORK IS STARTED RECALL FOR INSPECTION El $45 REINSPECTION FEE MUST BE PAID PRIOR TO INSPECTION REQUEST STOP WORK -UNTIL AUTHORIZED TO CONTINUE BY CITY INSPECTOR NO PERMIT -STOP WORK -REMOVE CONSTRUCTION OR OBTAIN PERMIT AND MAKE WORK'COMPLY WITH ALL APPLICABLE CITY CODES 9v THE ACTIONS OR CORRECTIONS INDICATED ABOVE ARE REQUIRED TO BE CORRECTED WMUN 3 CALENDAR DAYS OR PENALTIES MAY BE APPLIED. FOR INSPECTION CALL 425-771-0220 13 Building El Planning Engineering El Fire El Public Works 1). rd I L 6GTj_ Inst)ector 1,0 2, White: Permit File PinL- Enforcement I I Buff: Applicant a, .'-tic. i 819'J GARY HAAKENSON CITY OF EDMONDS MAYOR 121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 - FAX (425) 771-0221 Website: wwwxi.edmondsma.us DEVELOPMENT SERVICES DEPARTMENT Planning - Building - Engineering 1�� February 27, 2003 Mr. Nasser Ahmadnia 433 Ravenna Blvd Seattle, WA 98115 RE: Property at 21507 73d Place W Dear Mr. Ahmadnia: Tliank you for meeting with Lyle Chrisman and me on February 26, 2003 to discuss the concerns addressed in your letter of February 20, 2003. After discussing your concerns with you and your brother, we summarized them into three primary issues, which I would like to address as follows: 1. You feel you were singled out and treated inapproRnately by City Engineering Division staff during the plan review and inMection of your prgiect. Your allegations thatIngineer Division staff singled you out and treated you in a prejudicial and discriminatory manner are very serious allegations and are taken seriously by the City. Please be assured that it is the City's policy to treat all developers in a professional and consistent manner, as necessary to ensure compliance with applicable codes and approved plans. After reviewing your letter and your comments in our meeting, and looking into the project history, I must take exception to your allegations. Although your project had some site constraints that led to frustration for you in obtaining permit approvals, and some inspections resulted in disapproval and re -inspection, I believe our staff acted in a professional and consistent manner in our dealings with you. Nonetheless, it is clear that you are quite passionate in your perception of your treatment by Engineering Division staff. During our meeting, you agreed that there is nothing that can be done to change any past actions. However, I assured you that I will counsel our Engineering Division staff to make sure that we all have an appreciation for how our actions and procedures may be perceived, and that we make sure that we deal with.all developers in a professional, consistent, and respectful manner. 2. You believe. that the Edmonds Community Develgpment Code (ECDC) needs to be revised so it can be uniformly and consistently applied. We agree. It has been a number of years since the ECDC has had a major update, and there are a number of areas where it could be clearer and easier to interpret. Tbe. Development Services Director had planned to undertake the significant task of a major Incorporated August 11, 1890 I - & code update in 2003. Unfortunately, due to significant budget cuts this year, the City Council was not able to approve the funding in the 2003 budget that the Development Services Director requested to accomplish this task. Therefore, the best we can do for the foreseeable future is to continue to address and clarify individual issues on a case by case basis. If you can provide us specific recommendations to improve specific sections of the ECDC, that would be helpful and g . reatly appreciated. 3. You want C±tapproval. to not R Mace" that we have directed ith landsca in er the at)Droytd plans. As we discussed, there are actually two corrections directed by Mr. Chrisman's ett er of January 24, 2003 that, as of our meeting, you had not completed. You were directed in that letter to 1) remove the block wall from the City right of way, and 2) remove the asphalt area in the front yard that could be used as a parking space and restore landscaping per the approved plans. During our meeting, you agreed to remove the block wall from the right of way. Regarding the asphalt "parking space", you explained that you do not intend this to be a parking space and that your intent is that it be a walkway extension from your previously existing sidewalk. As we agreed, you will . submit a revised plan requesting City approval for a sidewalk extension in this location. I explained to -you that the City's concern is that this not be later converted back to a paved area that I could be used for parking because it does not meet City standards and would not be safe for parking a vehicle. Therefore, your revised plan must include permanent changes to the existing asphalt and features that will preclude it from being easily restored to a paved area that could be used to park a vehicle. In other words, prior to our approval, we must be assured that, for example, the landscaping cannot simply be removed again to restore the "parking space"., We are always working to improve our processes and procedures, and I thank you for providing us your input. DAVID K. GEBERT, PE City Engineer Cc: Mayor Gary Haakenson Duane Bowman, Development Services Director 0 NOTIC TO PERMITTEE AND/OR OWNER DO NOT REMOVE Q PARTIAL APPROVAL Q CORRECTON REQUIRED &ENFORCEMENT VIOLATION Owner &1110%'t A1W&V11* Permit Number A101fle Job Address— 7-3 —Site Contact WORK DESCRIBED BELOW HAS BEEN INSPECTED AND IS APPROVED L3 APPROVED PLANS AND JOB CARD MUST BE AVAILABLE, TO INSPECTOR ON SITE Ll CORRECTIONS LISTED BELOW MUST BE MADE: BEFORE WORK CAN BE APPROVED AND/OR THE NEXT PHASE OF WORK IS STARTED L3 RECALL FOR INSPECTION $45 REINSPECTION FEE MUST BE PAID PRIOR TO INSPECTION REQUEST STOP WORK -UNTIL AUTHORIZED TO CONTINUE BY CITY INSPECTOR , I NO PERMIT -STOP WORK -REMOVE CONSTRUCTION OR OBTAIN PERMIT AND MAKE WORK'COMPLY WITH ALL APPLICABLE CITY CODES a � 1111!11 ,I i� 4, MW, F&I MI.Vmmp THE ACTIONS OR CORREMONS INDICATED ABOVE ARE REQUIRED TO BE CORRECTED WITHIN /0 CALENDAR DAYS OR PENALTIES MAY BE APPLIED. FOR INSPECTION CALL 425-771-0220 .0 , Building 13 Planning El Engineering 0 Fire 13 Public Works White: Pvrmit File Pink: Enforcement Buff: Applicant 1112 C. 1 SW3 CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 * FAX (425) 771-0221 Website: wwwci.edmondsma.us DEVELOPMENT SERVICES DEPARTMENT Planning - Building - Engineering March 12, 2003 Mr. Nasser Ahmadnia 433 NE Ravenna Blvd Seattle, WA 98115 rd RE: Property at,215077,L3 Place W Dear Mr. Ahmadnia: GARY HAAKENSON MAYOR We have received your letter dated February 7, 2003. We believe -you intended to date your letter March 7, 2003, because it was received in our Development Services Department on March 7, 2003 and in our Engineering Division on March 10, 2003. The following is our response to the three, specific numbered items in your letter: My letter of February 27, 2003 responded to this item. In that letter I advised you of the action I intend to take. I have no further response. 2. My letter of February 27, 2003 responded to this item. I have not further response. 3. We have reviewed the revised plan submitted with your letter for a 6 foot wide asphalt walkway extending from your existing concrete sidewalk to the new asphalt driveway on the south side of your property. The tonfiguration of the proposed asphalt walkway is acceptable. However, we cannot yet approve it because your submittal does not address the City's concern id entified in my letter to you of February 27, 2003. Specifically, my letter stated that: "...the City's concern is that this not be later converted back to a paved area that could be used for parking because it does not meet City standards and would not be safe for parking a vehicle. Therefore, your. revised plan must include permanent changes to the existing asphalt and features that will preclude it from being easily restored to a paved area that could be used to park a vehicle. In other words, prior to our approval, we must be assured that, for example, the landscaping cannot simply be removed again to restore the 'parking space'." Please submit, by Friday, March 21, 2003, an explanation of how your revised plan provides the City such assurances. Incorporated AugUst 11, 1890 qic+or Cifil - 1-40trinAn TAn;%n Z' --- The deadline for completion of the actions required by the Correction Notice issued on March 3, 2.003, is hereby extended to March 21, 2003. Failure to respond -by this date may result in issuance of an Order to Correct Violation. When you bring your submittal in to City Hall, please be sure to submit it to a Development Services Department Permit Coordinator so that it will be properly received and tracked for plan review. Sincerel DAVID IC GEBERT, PE City Engineer Cc: Duane Bowman, Development Services Director Jeannine Graf, Building Official Steve Bullock, Senior Planner Date: Feb 20, 2003 To: Mayor Gary Haakenson City of Edmonds To:-, City of Edmonds Regarding: Property at 21507 73rd Pl. W Edmonds, WA 98037 Dear Sirs, FEB 2 1 2003 DEVELOPMENT SERVICES I am writing you regarding my latest issue with one of your inspectors and want to share with you my very difficult experience with the Engineering Division and Engineering Inspection department over the course of my construction project in Edmonds. I own and have been involved in the construction of three town homes addition to my property at 21505 73' Pl. W. I want to ask you a simple question? Would you as professional individual tolerate name calling and insult by a city inspector? This is the experience that I had last Tuesday morning (February 18 around 8:30am) with Ms. Danielle Gilbert (Engineering inspector) who called me after -calling my brother to get my mobile number. During the call, Ms. called me "stupid" -.and stated that "if you think that we are not watching you, you -are being.stupid". the phone call, I visited the city of Edmonds, to inquiry about her and find out -about her supervisor's name. On the same day, she had contacted zz�, the planning department, a different department from where she works, and had them it' --Ibpost a notice of enforcement violation on my property stating "landscaping removed to Z "',p 4J accommodate additional parking space. Remove parking spaces and restore landscaping." The space in question is not big enough to accommodate a car. Also, as.you can see from the drawings the landscaping had to be changed to allow access to the existing sidewalk to the house on the property. Without this access, you had to walk over the grass to get to lxd' A�-wwe_ the existing sidewalk which is not proper. i My problems with Ms. Gilbert are not recent issue. From her first encounter toward me and my project I can only conclude that she has prejudices toward me. It is my request to you to have her stop harassing me and have her avoid making phone calls to me. I found her phone call to me very upsetting and offending. And I found her comment "if you ��ao think that we are not watching you, you are being stupid" to imply that city of Edmonds 4;J Airrcp�) have too much resources and can spare inspectors to keep an eye just on us. If you see my project, you would be proud to have this project in.such a location, where on both north and south of my project there are very dense apartment buildings. I believe we have build the only side walk on the street. If you continue on this sidewalk in front of the house you'll immediately walk into the electrical post and wiring tensioners. Here is some my past encounters with Ms. Gilbert which leads me to believe she has a personal issue with me and my project. k! " I got a permit for my project issued by the City of Edmonds on July 13, 2000. At that time, the city of Edmonds had told me that I would be able to renew my permit for another year. One month prior to expiration of my permit, June 2001, 1 went to renew my permit and at that time I was told that I have to complete at least one inspection before I could renew my permit. My first experience with Ms. Gilbert was when she came onto the job site with Mr. Michael Snook (building inspector) for per -construction meeting. She made a comment that the set of plans that I present her was not legitimate approved site plans and she had to call to verify my original plans. She stated that her visit did not count as an inspection and she refused to sign the inspection card. We continue to do site development. Next, we installed 80 feet 8" side sewer with a manhole. Again, she came out and inspected the work but refused to sign the inspection card. Then on 7/9/02, we installed detention system and called for inspection again. This time we got lucky and got a different inspector. That inspector came out inspected the detention system and we got the first signature on our inspection card, what we needed to renew our permit. Again, on another occasion 7/18/02, we called for inspection of water line from the street to the new building site. This time neither I nor my contractor (John Spencer) were at the site, however, my contractor's son was there. At that occasion Ms. Gilbert comes to the site and notices that the contractor did not have copper wire around the water line and she comments to my contractor's son, that she is very made at me and I (Nasser) should have know better. Why does she exhibit such behavior? I ask you is this type of treatment that people building in Edmonds should expect? I must tell you that I have heard in numerous occasions that -builders avoid building in -Edmonds because of similar -treatments that I have encountered. In numerous occasions I had called for inspection and Ms. Gilbert had either not showed up for inspection or failed.to re -schedule. Overall I had a total of 7 inspections required by Engineering Department (Ms. Gilbert) and all of them were challenging and frankly nightmarish. In contrast, I had, 16-17 building inspection done by the Building Department by Mr. Michael Snook and all of these inspections were pleasant experiences. In fact, Mr. Michael Snook encouraged my to build again in City of Edmonds which I'll n ever do. Also, my Fire and Planning inspections were completed very professionally. My problems with the Engineering department goes back to Mr. Lyle Chrisman, Development Services Engineer, reviewing of my project where he insisted on enforcing an non -existing set back called "shy distance". It toke six months and may registered letters to get a reply and finally Mr. Gerbert had to step in to resolve this matter. I would like your office to look into this discriminatory behavior and reply within 7 days to my letter since I only have 10 days to reply to the Notice I received from city of Edmonds. Regards, Nasser Ahm AdmA 41�4 C. 1 S9\3 CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 - FAX (425) 771-0221 DEVELOPMENT SERVICES DEPARTMENT Planning - Building - Engineering November 21,2002 A H ossein Ahmadnia 122 NE i58th St Seattle, Wa 98155 Re: Request for Address Change Dear Mr. Ahmadnia; GARY HAAKENSON . I MAYOR r This letter is to inform you that your request for an address change has been . granted. The old address Of 21405 73rd P1 W is nOW 21507 73 rd PlWand 2.1407 73rd P1 W is nOW 21505 73rd P1 W. This may seem confusing at first but the numbers must get smaller as they go north SO 21507 must be south of 21505. 1 will inform all City Divisions including Fire, Police, Utility Billing, Public Works and Building. It is your responsibility to inform the Post Office, the Phone Company for Enhanced 911 emergency purposes and all other interested parties of this correction. Si cerely, c Y' a Palma *er Permit Coordinator City of Edmonds Cc: Fire Department Police Department Utility Billing Public Works Building Official/Street File L\Teffjp\]DST's\Master Leuem\Address Change Incorporated August 11, 1890 Sister City - Hekinan, Japan Nov 21 U2 Ul:UZJP virarge Ldgi6 uur-V. k � C- � j I I r. - Nov 21, 2002 Fax: 425-771-0221 Attn: Lara Palmatier 11i Lara, I am requesting a change to the following addresses: Old Address New Address 21405 73'd pl W 21505 73rd PI W 21407 73d PI W' . 21507 73"d PI W The current addresses do not correspond with the street crossing Best Regards, H AJ�madrd' , ,. aLl 206-715-0747 BUILDING DEPT. 0 RETURN ADDRESS: City of Edmonds,- City Clerk 121 5th Avenue North Edmonds, WA 98020 CONFORMED COPY 200108070284 08/07/2001 12:42 PM Snohomish P-0002 RECORDED County DECLARATION OF RESTRICTIVE COVENANT MULTI -FAMILY RESIDENTIAL Reference #: -;�-o C) / __ 0 5�a Grantor(s): (1 1 Additional on pg. _4ADsse'y,\ Ahm Grantee(s): - City of Edmonds Legal Description (abbreviated): Sec_i-_,,L—Twn d-, -L-Rng Qtr A/ k/ OR Lot ------Block --- Ylat Assessor's Tax Parcel ID#(s): (1) S) 0 Ij — L2,012 - 0 0 5 - (2) -----Assessor's Tax Parcel ID# not yet assigned WHEREAS, 17&5�-4_�rAJ are the owners of the following described real estate in the City of Edmonds, to wit: Property Address: a�_ 117-31 P L. Legal Description:- I�Z Assessor's Tax Parcel ED # (s): (10 13 000 00'13_110_&� AUTHORIZED FOR RECORDING C, of Edmonds By:. Date Page of J_, WHEREAS, the above named owners are desirous of imposing a restrictive covenant upon said premises in compliance with Section 19.00.040 of the Edmonds Community Development Code. WITNESSETH, that for and in consideration of the premises, the above named owners do hereby declare and grant to the City of Edmonds as Grantee the following restrictive covenant, to -wit: That at the time of the execution of this Covenant the Grantors have agreed to the Ordinance of the City of Edmonds provide that no building for multiple family housing may be erected on subject property containing more than — 2 . units. Said Covenant shall be binding upon all present and future owners of said real estate and' their heirs, successors and assigns. DATED this C2 —day of�_,A CA_� 1-9��o _,4�K GRANTOR GRANTOR State of Washington )ss County of 4w::,) I certify that I know or have satisfactory evidence that AIL R+VtA1DJ4tA signed this instrument, on oath stated . that he/she was authorized to execute the instrument and acknowledged it as the ou_1710ZIA (title) of (name of party on behalf on whom instrument was executed) to be the free and voluntary act of such party for the uses and purposes mentions in this instrument. Subscribed and sworn to before me this of ZOL:f M & '90", 1 , ............ LZ AJ CJ 110 .0 Notary Pd%lic in and for theState of Washington. Z AOTA My commission expires ri-R-2,D3 CD PUBUG -.V&, ZV SZ AUTHORIZED FOR RECORDI14G 17, -',Cur City of Edmonds WAS ,"fill 1111000% By: Ze Date... MW Page COZ of -*2- LATEMMUILDINGWORMSMSTRICT 0 CITY OF EDMONDS GRADING AND DRAINAGE PLAN NOTES ALL WORK AND MATERIALS SHALL BE IN COMPLETE ACCORDANCE WITH STANDARDS AND SPECIFICATIONS OF T14E CITY OF EDMONDS AND THE APWA STANDARDS AND SPECIFICATIONS. 2. THE CONTRACTOR SHALL KEEP TWO SETS OF APPROVED PLANS ON SITE AT ALL TIMES FOR RECORDING AS -BUILT INFORMATION; ONE SET SHALL BE SUBMITTED TO BARGHAUSEN CONSULTING ENGINEERS, INC., AT COMPLETION OF CONSTRACTION. PRIOR TO ANY SITE WORK PERTAINING TO DRAINAGE, THE CONTRACTOR SHALL CONTACT THE EDMONDS ENGINEERING DIVISION TO SET UP SCHEDULING. 4. GRADING OUTSIDE OF THE CITY RIGHT- OF- WAY MUST COMPLY WITH CHAPTER 70 OF THE UNIFORM BUILDING CODE. 5. ALL PIPE SHALL BE INSTALLED WITH CLASS "B"BEDDING IN ACCORDANCE WITH APWA STANDARDS. 6. BACKFILL TRENCH OF PIPES IN LIFTS OF 6 INCHES TO 8 INCHES AND COMPACT TO 95 PERCENT MAXIMUM DENSITY (ASTM D- 1557) UNDER ROADWAYS AND 90 PERCENT MAXIMUM DENSITY (ASTM D-1557) OFF ROADWAYS. 7. ALL BUILDING DOWNSPOUTS AND FOOTING DRAINS SHALL BE CONNECTED TO THE STORM DRAINAGE SYSTEM. 8. ALL STROM PIPE AND FITTINGS DESIGNATED AS PVC SHALL BE POLYVINYL CHLORIDE (SDR-35) WITH RUBBER GASKETS CONFORMING TO ASTM D-3034-73. 9. INSTALL TEMPORARY CATCH BASIN SEDIMENT TRAPS ON ALL EXISTION OR NEW CATCH BASINS ON SITE DURING CONSTRUCTION. 10. ALL SPOT ELEVATIONS SHOWN ON THE PLAN ARE TO TOP OF PAVEMENT UNLESS OTHERWISE NOTED. 11. IF ANY UNKNOWN SUBSURFACE STRUCTURES ARE ENCOUNTERED DURING CONSTRUCTION, THEY SHALL IMMDIATELY BE BROUCHT TO THE ATTENTION OF THE OWER'S ENGINEER PRIOR TO PROCEEDING. 12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF ALL EXISTING UTILITIES TO REMAIN IN USE WITHIN THE CONSTRUCTION AREA WHETHER SHOWN OR NOT SHOWN ON T14E PLANS. 13. PROTECTIVE MEASURES SHALL BE TAKEN BY THE CONTRACTOR TO PROTECT ADJACENT PROPERTIES, PUBLIC AND PRIVATE, AT ALL TIMES DURING CONSTRUCTION. 14. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INPORTING AND/OR EXPORTING ALL MATERIAL AS REQUIRED TO PROPRLY CRADE THE SITE TO THE FINISHED ELEVTIONS SHOWN HEREON IN ACCORDANCE WITH THE APPROVED PLANS, SPECIFICATIONS AND THE SOILS ENGINEER'S RECOMMENDATIONS. MAR 2001 DE\fELOPMEW SERVICES CUTR- CITy OF EM1011"S 0 0 15. THE STORM DRAINAGE SYSTEM SHALL BE CONSTRUCTED ACCORDING TO THE APPROVED PLANS, WHICH ARE ON FILE WITH EDMONDS DEVELOPMENT SERIVERS. ANY DEVIATION FROM THE APPROVED PLANS WILL REQUIRE WRITTEN APPROVAL FROM THE APPROPRIATE DIVISION. 16. ALL "ENGINEERED FILL" SHALL BE COMPACTED TO 95 PERCENT MAXIMUM DENSITY (ASTM D- 1557). ALL IMPORTED FILL MATERIAL SHALL BE BANK RUN GRAVEL, CLASS "B." THE EMBANKMENTS SHALL BE CONSTRUCTED IN SUCCESSIVE HORIZONTAL LAYERS NOT EXCEEDING 8 INCHES IN LOOSE THICKNESS WHICH INCLUDES FILL IN CULVERT AREAS. 17. THE FACES OF CUT AND FILL SLOPES SHALL BE PREPARED AND MAINTAINED TO CONTROL AGAINST EROSION. THIS CONTROL MAY CONSIST OF EFFECTIVE PLANTING. THE PROTECTION FOR THE SLOPES SHALL BE INSTALLED AS SOON AS PRACTICABLE. WHERE CUT SLOP ARE NOT SUBJECT TO EROSION DUE TO THE EROSION -RESISTANT CHARACTER OF THE MATERIALS, SUCH PROTECTION MAY BE OMITTED. 18. CONSTRUCT DRAINAGE SWALES TO DRAIN BACK, SIDES AND FRONTS OF ALL BUILDINGS AS NECESSARY, 2.0 PERCENT MINIMUM SLOPE. 19. CONSTRUCTION OF DEWATERING (GROUNDWATER) SYSTEM SHALL BE IN ACCORDANCE WITH THE APWA STANDARD SPECIFCATION, SECTION 61-3.02. 20. CONTRACTOR SHALL ASSURE THAT ALL EXISTING STROM DRAINAGE STRUCTURES RECEIVING RUNOFF FROM THE SITE HAVE NOT BEEN IMPACTED BY CONSTRUCTION ACTIVITY. 0 0 CITY OF EDMONDS GENERAL CONSTRUCTION NOTES CONTRACTOR SHALL ADHERE TO ALL APPLICABLE LOCAL CODE REQUIRMENTS IN PROVIDING EXTENSION TO PIPING, CONDUIT AND OTHER UTILY ACTIVITIES. 2. SEE SITE PLAN FOR DETAILED INFORMATION AND DIMENSIONS RELATED TO CURB RETURNS, PLANTER DIMENSIONS, SETBACKS, PAVEMENT EDGE LOCATIONS, ETC. 3. FOR AID IN UTILITY LOCATION CALL 1-800-424-5555 PRIOR TO BEGINNING CONSTRUCTION. 4. ALL CURBING TO BE 6 INCHES HIGH EXTRUDED CONCRETE CURBING PER DETAIL AS NOTED ON PLAN UNLESS OTHERWISE NOTED. 5. CONFLICTS SHALL BE BROUGHT TO THE ATTENTION OF BARGHAUSEN CONSULTING ENGINEERS, INC. AND SHALL BE RESOLVED PRIOR TO PROCEEDING WITH CONSTRUCTION. 6. UTILITY LINES MAY NOT BE COVERD UNTIL AFTER THEY HAVE BEEN TESTED AND APPROVED. UPON COMPLETION OF THE BACDFILL OPERATIONS, THE UTILITY LINES SHALL BE RETESTED. 7. ALL UTILITY LINE EXCAVATION BEDDING AND BACKFILL MATERIALS AND COMPACTION SHALL BE PERFORMED IN ACCORDANCE WITH THE SOILS ENGINEER'S RECOMMENDATIONS AND T14E GOVERNING AGENCY REQUIREMENTS.UTILITY LINES S14ALL INCLUDE STORM DRAIN, WATER, SEWER, ELECTRICAL, TELEPHONE, AND LANDSCAPE IRRIGATION LINES. ALL SANITARY SEWER LINE SHALL BE PVC SDR 35 SEWER PIPE CONFORMING TO ASTM D-303A-73. CALL THE ENGINEERING DIVISION AT 425-771-0220, EXT 1326 FOR INSPECTION. 9. ALL WATER SERVICE SHALL BE COPPER TYPE K OR POLYETHYLENE PIPE. POLYETHYLENE PIPE SIZE SHALL BE IRON PIPE SIZE ASTM-D2239-SIDR#7- PE3406, AND SHALL BE MARKED AT INTERVALS NO GREATER THAN 5' WITH THE MANUFACTURERS NAME, SIZE AND MINIMUM PSI RATING OF 160PSI. 12 GAUGE VINYL COATED WIRE SHALL BE CONTINUOUS, WRAPPED AROUND THE METER AND AT THE HOUSE AND SHALL BE TAPED TO THE WATER PIPE EVERY 10'. CALL THE ENGINEERING DIVISION AT 425-771-0220, EXT 1326 FOR INSPECTION. 10. A TACK COAT SHALL BE APPLIED TO ALL CONCRETE EDGES TO WHICH ASPHALT IS TO BE PLACED. ii. SOIL STERILIZATION (WEED KILLER) SHALL BE APPLIED IN AREAS TO BE PAVED. KEEP 2 FEET (MIN) CLEAR OF EXISTING AND PROPOSED LANDSCAPE AREAS.APPLY AT MANUFCTURER'S RECOMMENDED RATE TO ASSURE PROPER PENETRATION. 12. SURFACE SMOOTHNESS OF ASPHALT SHALL NOT BE ACCEPTABLE IF EXCEEDING 1/4 INCH USING A I 0-FOOT STRAIGHT EDGE. PONDING OR 0 "BIRDBATHS" EXCEEDING 1/41NCH IN DEPTH SHALL LNOT BE ACCEPTABLE AND SHALL BE CORRECTED BY THE CONTRACTOR. 13. ALL EXISTING UTILIES SHOWN ON THESE PLANS WERE OBTAINED FROM A FIELD SURVEY AND FROM AVAILABLE PUBLIC RECORDS. CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UTILITIES, WHICH MAY CONFLICT WITH CONSTRUCTION WHETHER SHOWN ON THESE PLANS, OR NOT. ENGINEER DOES NOT WARRANT THAT ALL UTILITIES HAVE BEEN SHOWN. 14. IT SHALL BE THE CONTRACTOR'S REPONSIBILITY TO NOTIFY THE TELEPHONE COMPANY, THE GAS COMPANY,THE POWER COMPANY, AND THE CABLE TV COMPANY PRIOR TO CONSTRUCTION SO THAT THESE OTHER UTILITIES CAN PREPARE THE NECESSARY PLANS FOR THE EXTENTION OF THEIR RESPECTIVE UTILITIES. IT SHALL BE T14E CONTRACTOR'S RESPONSIBILITY TO COORDINATE THESE ACTIVITIES DURING CONSTRUCTION. 15. FOLLOWING COMPLETION OF T14E WORK, THE CONTRACTOR SHALL BE REQUIRED TO REMOVE ALL CONSTRUCTION EQUIPMENT, MATERIALS AND DEBRIS FROM THE SITE AND TO PROVIDE FINAL CLEANUP ACTIVITIES AS DIRECTED BY EITHER THE CITY OF EDMONDS OR T14E OWNER'S ENGINEER. CITY OF EDMONDS EROSION / SEDIMENTATION CONTROL PLAN NOTES ALL REQUIRED SEDIMENTATION/ EROSION CONTROL FACILITIES'MUST BE CONSTRUCTED AND IN OPERATION PRIOR TO CONSTRUCTION TO INSURE THAT SEDIMENT LADEN WATER DOES NOT ENTER THE NATURAi� DRAINAGE SYSTEM. ALL EROSION AND SEDIMENTATION FACILITIES SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING AND/OR CONSTRUCTION IS COMPLETED AND POTENTIAL FOR ON - SITE EROSION HAS PASSED. THE IMPLEMENTATION CONTROL SYSTEMS SHALL BE THE RESPONSIBILITY OF THE PERMITTEE. THE EROSION AND SEDIMENTATION CONTROL SYSTEMS DEPICTED ON THESE PLANS ARE INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION PROGRESSES AND UN EXPECTED OR SEASONAL CONDITIONS DICTATE, FACILITIES WILL BE NECESSARY TO INSURE COMPLETE SfLATION CONTROL IN THE PROPOSED SITE. DURING THE COURES OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILTY OF THE PERMITTEE TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY HIS ACTIVITIES AND TO PROVIDE ADDITIONAL FACILITIES, OVER AND ABOVE MINIMUM REQUIREMENMTS, AS MAY BE NEEDED TO PROTECT ADJACENT PROPERTIES AND WATER QUALITY OF THE RECEIVING DRAINAGE SYSTEM. 3. APPROVAL OF THIS PLAN IS FOR EROSION/SEDIMENTATION CONTROL ONLY. IT DOES NOT CONSTITUTE AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE, NOR LOCATION OF PIPES, RESTRICTORS, CHANNELS OR RETENTION FACILITIES. 4. ANY DISTURBED AREA WHICH BEEN STRIPPED OF VECETATION AND WHERE NO FURTHER WORK IS ANTICIPATED FOR A PERIOD OF 30 DAYS OR MORE MUST BE IMMEDIATELY STABILIZED WITH MULCHING, GRASS PLANTING, OR OTHER APPROVED EROSION CONTROL TREATMENT APPLICABLE TO THE TIME OF YEAR IN QUESTIONS. GRASS SEEDING ALONE WILL BE ACCEPTABLE ONLY DURING THE MONTHS OF APRIL THROUGH SEPTEMBER, INCLUSIVE. SEEDING MAY PROCEED OUTSIDE THE SPCIFIED TIME PERIOD WHENEVER IT IS IN THE INTEREST OF THE PERMITTEE, BUT MUST BE AUGMENTED WITH MULCHING, NETTING, OR OTHER TREATMENT APPROVED BY SNOHOMISH COUNTY. .70, Aflq c,4 t A) NOTE: A- IF DRIVEWAY WIDTH EXCEEDS 15', INSTALL A FULL DEPTH EXPANSION JOINT. OR l---l' 16' VERTICAL CURB DRIVEWAY APRON SHALL BE A MINIMUM EXPANSION JOINT OF 6' THICK AND SHALL BE PLACED ON OF 5/8' CSTC AND COMPACTED GRADE. .40 5' 1/2' LIP 6' CURB CONCRETE SHALL BE CLASS 3- 300OPSI I DRIVEWAY CURB TRANSITIONAL DETAIL FOR CURB AND GUTTER OR VERTICAL CURBS CURB AND GUTTER SHALL BE POURED. SEPARATELY FROM THE SIDEWALK. FORM INSPEC TION REQUIRED PRIOR TO POUR. F UR 0 B S R S L ME E22MG REVISIONS STAN DAR D D ETAI L STANDARD DRIVEWAY ENTRANCE 'Est. 1890 DATE 5/14/98 —T-� NTS I DWG NO. There were several issues with this permit during the review of the drawings. The biggest was access width on the south side of the project. Originally the architect indicated two way traffic and this would have required a 16' driveable access. In order to meet that requirement the architect was told he first floor of the existing house to be cut back in order to get the required 16' and initially, that was shown on the drawings. Our policy, although unwritten but used for years, required a two foot shy distance from structures which the ECDC defined fences and of course buildings as structures. This issue was expressed to the architect and when Gordy did the initial review and I carried if forth when I took over. I sent Nasser excerpts from the code that defined structures and tried numerous times to -explain why it was required. We went around and around on this and he procrastinated in responding to our requirements. Finally he decided to make the access on the south side one-way and we identified the access width as a minimum of 12'. With the first floor cut back and the access one-way, the required distances could have been met. As it turned out, the architect's drawings did not accurately depict the width between the existing fence and building. The shy distance was still required from the fence but allowed him to place a curb along the side of the house, which was to have landscaping behind it to provide some protection to the house. When inspected the minimum width, shy distance, curbing and landscaping was not met nor could it be. 00- �OLE August 13, 1980 MEMO TO: Planning Department FROM: Engineering Division SUBJECT: AUGUST 20, 1980 - BOARD OF ADJUSTMENT MEETING CONTINUED AGENDA 1. V-21-80 HAROLD WICKSTROM - Variance from required underground requirement of Chapter 6.30.060 for property located at 20331 83rd Avenue West. (RS-8) No comment other than to note that the requirement was made for undergrounding at the time of subdivision and again at the time of building permit application. All other newer homes in the area have underground electric service. 2. V-22-80. NEAL & KAY JOHNSTON - Variance from required rear yard setback, access width, and reduction of square footage requirement at 21405 73rd Place West. (RML) Engineering Division does not object t� this variance. The existing 23 feet should be adequate for an access road plus utility installation. At time of A.D.B. app- lication the site plan shall be reviewed for code confor- mance of said road plus parking layout and other site improvements. We have no comment on the other two aspects of this application. AGENDA I 3. V-24-80 DAVE HERMANS - Variance to waive minimum lot width to length requirement and to allow fireplaces to inavade setbacks approximately two feet at 221 3rd Ave. S. (RMH) Neither of these variances shall adversley effect the previously approved parking lot/site plans. Engineering does not object to these variances. (See'ADB-114-78) 01 ��M M DAN SMITH D-1 00 o's 0 Ll 4.18-60 ,,�S!AJNVEA AND FEVIEW ASS16NMF-NrS- ACTION- V-22-96DATE. 6-2-3-AriPAGE OF 'OWNER NAME; Necil os /-o 11 ADDRESS'. ZI.?Z- T;I:—ct AVE-WO 4�F Cl k417 0 Jf 4( 5 A- Zj3 APPLICANT 'NAME: ADDRE55., SITE LOCATION OP, ADDRESS: 0 S-- 7.? jL-0 P4, 4u F R M LE,5AL DiScltjpTjo-N:, liot' S'o 4(4S&4ej� rrqcts pla, Alo, 3 ATTACHF-b F I L FE oft TYPE OF ACTION D I V. RECID. DATE to tj ul cc pol A %, a. �- 1, , x %#. z tj i z 4c . maim(i 'PATE. F-,S u L. r s ct a * F I L E 0 1 N Ift 0 , X 3 p t z a ! ofilt 0' va NEXT MEETING PATE SET zo 0 CC Do: -c 4 al cc w 0 tn IA 4 - L ';(A to 0 lid 7-- a -m X, A x w. CL. Assl4lap DATE TO I NOTE S DATE ay�— q- -A u sslamop DATE To ENGINEERING R E V I E W5=--z---- NOTIES DATE By PREVIOUS HISTORY SITE REVIRW V(SITI I I I I LITILI-TIES .. I I I PRAlNA4F-/-r*Po6#tAP14Y srREErs ISIDIWALKS TRAFFICIFAFt KING 17,CNIN4 CODE -FIRE MAXSHAL I=IL.0 MEMO TO PLANNING July 9, 1980 Page 3 S riLE EE 7. V-22-30 NEAL & KAY JOHNSTON - Variance from required rear yard setback access-width,--and--reductiornvlof square footage r e q u i r e � e n t a tigg &d-61j7,f3kxd 2 RM I Zlelae'*s "t (RML) Engineering Division does not object to this variance. The existing 23 feet should be adequate for an access road plus utility'installation. At time of A.D.B. application the site plan shall be reviewed for code conformance of said road plus parking layout and other site improvements. We have no comment on the other two aspects of this application. 8. V-23-80 J,.--DI,RK-LOFIMAN�--Vari-alh-t�-froiii required rear yard setback At"1_8817. So-und-IU64- Place. �RS-12) No comment. DAN SMITH DT. JIM ADAMS DT. V-22-80 NEAL and KAY JOHNSTON-- Variance from required rear yard setba ck, access wi an square footage requirement at 5 . 73rd , PI .- W../� (RML) r1arices requested were to reduce OC ard setback from 20' to v,90, - "and to allow 5 units when the area would support only 4.7 units. It BOARD OF ADJUSTMENT Page 4 - July 16, 1980 was determined that a variance was not needed for the access width. Mr. Bowman reviewed the variance criteria. This would not amount to a rezone and there were no special conditions involved. Adjacent properties had been developed to the north and west with multi -family and with single family farther to the west. Strict enforcement of the zoning code would deprive the property owner of rights enjoyed by other properties in the same district because adjacent properties had been developed to a higher density. There were no unnecessary hardships in carrying out the provisions of the zoning code, however. Granting of the variances would not be detri- mental to the health, safety, or welfare of other property owners in the vicinity because of the higher density developed in adjacent areas. Mr. Bowman felt both were minimum variances and that they would be compatible with the zoning code as the property generally would be developed in accordance with RML requirements. He recommended approval. The public portion of the hearing was opened. The applicant had nothing to add, and no one else wished to speak. The public portion of the hearing was closed. Mrs. Medina noted that they were 640 sq. ft. below the required area for five units. She was told the intent was to build a fourplex behind the existing house. Mrs. Medina observed that the zoning had been changed in order to reduce the number of units on these lots so she did not believe that 640 sq. ft. was a minimum variance. Mr. HatzenbOhler noted that it is easier to build a fourplex than a triplex. MR. HATZENBUHLER MOVED TO APPROVE V-22-80 BECAUSE HE DID NOT FEEL IT WOULD ENDANGER THE PUBLIC HEALTH AND MORALS AND HE FELT IT WOULD BE IN HARMONY WITH THE SURROUNDING AREA AND WOULD MAKE REASONABLE USE OF THE LAND. VICE CHAIRMAN BYRD SECONDED THE MOTION, FEELING IT WAS A MINIMUM VARIANCE WHEN CONSIDERING THE SURROUNDING DEVELOPMENT OF PROPERTY. Mrs. Medina said the area around this site is overdeveloped and the zoning was changed to alleviate some,of that. She felt there was a valid reason to rez * one that'area and said added units would create additional traffic. Mr. Hatzenbuhler argued that.property is becoming a premium and it is not possible to spread out more so the only choice Is to be more dense*on the ground. Mr. Bowman noted that the single family development is farther to the west and that the apartment develop- ment is all just to the north of this site and farther to the south. ' He said this is one of.the last pieces of property there that can be developed into apartments, that it is a single family house existing in a multi- family zone. Mrs. Medina said there are children all over the place, and the question was whether this was a minimum variance, and she thought it was not. THE VOTE WAS TAKEN, WITH MR. HATZENBUHLER AND VICE CHAIRMAN BYRD. VOTING YES, AND WITH MRS. MEDINA AND MRS. McGEE VOTING NO, RESULTING IN A TIE VOTE. MOTION FAILED FOR LACK OF A MAJORITY. At the request of a person in the audience, MRS. MEDINA MOVED, SECONDED BY MRS. McGEE, TO REOPEN THE PUBLIC PORTION OF THE HEARING. MOTION CARRIED. The public portion of the hearing was reopened. Don VanDriel, 1233 Olympic View Dr., said he had been involved in selling. this property originally. He said the home is on the street and there is a 23' access alongside the home which is adequate for access to the rear. The back portion of the property has large apartments on one side and a nursing home at the back of it, and it becomes a large piece of property which is zoned for multi -family dwellings. He felt the highest and best usage In that area could best be served by allowing this variance. He said it wou-Id not cause any problems because the other development is quite a distance from the property line. Further, he noted that the change was from a 3-unit to a 4-unit building, a matter of one additional unit, and the design of a building normally is not that different, and for appearance's sake it normally would not look that different. He also noted that the buildings would not even be seen from the street. He felt that by limiting it to three units that would be cutting down a large portion of the allowable space and in the costs of construction and of land that would adversely affect the owner. He said these fourplex units have become very acceptable BOARD OF ADJUSTMENT Page 5 July 16, 1980 and are comfortable units, and the traffic conditions made by one unit would not be adverse when you consider that the adjoining apartment building is 34 or 35 units. He requested that the variance be approved. There were no changes Indicated in any of the votes. MRS. MEDINA MOVED, SECONDED BY MRS. McGEE, TO CONTINUE V-22-80 TO AUGUST 20, 1980 TO ALLOW MORE BOARD MEMBERS TO PARTICIPATE. THE MOTION CARRIED. City Attorney --,Wayne Tanaka advised the Board members that they should not engage in any ,;Contact with any of the parties and they should not discuss this matter ..among themselves. CITY OF 090 EDMONDS FILE # BOARD OF ADJUSTMENT DATE APPLICATION FOR VARIANCE F E E REC-T # HEARING DATE: APPLICANT Neal & Kay JohnstorADDRESS 2132 93rd Ave. W 'CITY & ZIP Edmonds, 98020 PHONE 774 6198 _Indicate type or degree of interest in the property: Owner OWNER: —Same ADDRESS,CITY & ZIP Same as Above PHONE LOCATION OF PROPERTY(ADDRESS) 21405 73rd Place W. Edmonds, WA 98020 LEGAL DESCRIPTION OF PROPERY: Lot #5, Luschen's Tracts Division No-3, as per plat recorded in Volume 17 of plats -on p . age 87 records of Snohomish County; Situate in the county of Snohomish, State of Washington LEGAL DESCRIPTION CHECKED & APPROVE[ USE ZONE RML BY PLANNING DIVISION ZONING ORDINANCE REQUIREMENT: 1.) Rear yard set back (20') Vk rj,�- r-eq V'e � 2 r-1JK1z.Q-Q- -4 ) M; ; -P 4- AMAIII Ok4 LACLL V UV CXPZ L I=qL4 LA I t�Lllt:l I UO �7Tf A VARIANCE REQUESTED: I. Reduction of reai 0 r, wi,Akh 3.) Allow a reduction of squ W footage requirement of 5.6 percent or 686sq.ft. STATE14ENT OF CONDITIONS AND REASONS FOR REQUEST, IN ACCORDANCE WITH STANDARDS AND CRITERIA ATTACHED: See Attached STATE OF WASHINGTON) Ss. COUNTY OF SNOHOMISH .A Si'gnatuKe of Applicant, Owner or Representative On this date, before me, the undersigned, a Notary Public in and for the State of Washington, duly commi ssioned and sworn, personal ly appeared ­/`--.'- -,-/- - ­ , - . / �,. . , - vtho, bein( duly sworn, on his/her oath deposes and says that (s)he has preparedand read the-f—cre"Doing statements and has acknowledged to me that the recitations contained therein are Lrun, and has signed this instrument as his/her free and voluntary act and deed for the purposes ther6in t4 men oned. Subscribed and sworn to before me this.'..' day of C 19 if -residing at,,-,,." Notary Public in and for,. -the State of WRMR0461- JUL 8 i�,M Di� u. -O'ALLEGATIONS'OF APPLICANT POINT 1. The 'following are the special circumstances whic . h apply to my property which deprive me of rights and privileges which are enjoyed by other properties in the vicinity under the identical zone classification. See Attached POINT 2. The variance I am requesting will not be detrimental to the public wel- fare or injurious to the properties or improvements.in the vicinity of a zone in which my property is located because' See Attached POINT 3. If this variance is not granted, an unnecessary hardship will continue to the owner of this property, the cause of which is beyond his control because: See Attached POINT 4. So as not to grant a special privilege to me by the granting of this variance I submit the following conditions to be imposed so as not to cause in- consistencies with the limitations upon other properties in the vicinity and zone in which I am located. Variance I and II: None Variance III: It would seem appropiate if the applicant were required to install a 5' solid cedar fence along is - the rear property line. 1;17- i V E J� YL 8 1980 r, vi.g. Of pf3blic 0 0 A WI/229 -#-b4 EDMON S LYP# MOUNTLAK&, JIAL-I�w I %POD. M-11cy --." ------------ 112 64 E *0 10-0 ..... . . . . . . 343.08 343.09 1 6 0 2 4 'ARSHE 'S 1�0 Id McFis— ---- �'D 1 .4 M s N W(BLAND6 p)�)OpOS eD Z1317 S7 VA �44N 0 E Oil ThAqT 2 %() T4 Rom :kT 2 3 4 5 84.4 2 LUS F6%#H]rN JS R C =S 80 4 so 6 '15 1'11.64 8TH ST. S. E. " - �o a 16 is NO. — I�v i. tl.-.:,., W, SOU4L > ERS Z6 'Z 5 0 V. .4 C A tp! 217 0 L;!7 0 -1 IITH R 0 I- 'L S H 10 10� 15 uj 6 v co N�-I 4 5T 7. CL 140.84 13DI V, N-0-- 3e !p 140.70 A 12 10 60 ------ IOTH %F-86-0-7 --------- 28 AAA& ST. S. E. db M A ch A 29 30 -tj W 23 0 C\1 FIVE" ST. 6o L S. E. Z R E C E-'4 JUL 8 Dir. Of 11g,44- -q 't� 2 - �rpv Alum 16 W1 134 fh M tVr toll 14. s T- C A L F I A 2 S' 7/7 1 N 0 0 2-5 '_,Fo Pi E C I V C-7, THI 8 lQpn Dir. Of Pij;, �03 7G. ZI-f ZZ 0-7 OT &-f 9 90 - 4S ;-7"-6T2 6 xfj 4 7 9 . T If pil ijk- IWO- CD 05 UJ C C-1 NTI A (7 1'0 1 tMi NoW OWNER .... .......... .... ....... ....... . ... ... .. .... s T i I." ET ui 110USE No.( ..... ........ ................. . .. ...... . . . . ... . ........ ..... A V EN U F LOT N o. .... .... BLOCK .... .. No, . .... Ic z N:%;MFl ADI') . ... ................ . ... .. ...... .. ......... .. . ........ . ............ ........ APPROVED UG 4 1964 ------------- ----------- Date Approved: .................... .............. DEPOSIT, $ ........................... ..... ........ �ACKFILL WORK .............. i.8EWER NVORK ORDER ISSUED .............. !N 0 0!* POINT 1*:; 0'. Variance I : The existing house vyas constructed too close to the property line to allow required access. At present the applicant is deprived of the right to construct four units on his property because of this circumstance. Variance II: The applicant had obta'ined an agreement to be granted some additional land from the adjoining property to the north. This additional,land would have satisfied the zohing requirements. The property to the north is presently a legal non conforming building. By ordinance, this precludes the granting of a lot line adj'�istment, thus making the granting of said land impossible. Variance III: The required set back between the existing house and the proposed new building causes the new building to extend towards the rear of the yard farther than would normally be required. POINT 2:, Variance I: The proposed drive way will run parallel with an abutting drive of a multi -unit building. The drive will be consistent with existing drives in the vicinity. Variance II: The granting of this variance will not adversley effect or be injurious to any of the properties in the vicinity. A majority of the surrounding construction is at a higher density then this variance would allow. Variance IIIt The building that is on the property abuttin the rear of applicants prqper'tyis at a lower elevation that causes most of.the proposed - building site to be hidden from its view. JUL 8 1980 Taking this into consideration the granting of a 2' variance would not adversley dffectDir.01P"�'," that property. There would be no impact on any other properties. POINT Variance It If this variance is not',granted the owner will be unable toconstru,ct,-a multi -family building which his.'property is zonned for. Variance II: The applicant feels that the intent of the RML Zoning is to limit densi ty to an accept- able level. The addition of three tenths of a unit seems to fall into this level of acceptance. It would be an unnecessary hardship to not be allowed to build within the intent of the zoning laws. Variance III: There would be no hardship imposed directly upon the owner of this property. The hard- ship would be imposed upon the general public. The applicant feels an obligation to provide the most liveable rental unit he can. By not granting this variance it would make it unnecessarily difficult to build a enjoyable living unit for a family. RECD JUL 8 1980 Dir. Of F;.. - W. 49,44' Moe � Vedm W1,6,4 fiWf V�r q,?. 2 NZ4 tk 6' qo. 00 S le LAJ e, ,r7 IJ F of A Oki cn� ISN 'zo, ;en ce- N 0 Z� 0 0 RECEiVk----") JUL 8 1980 Dir. of Public. 00 FILEC��' I T --i-I 6' F -E D M 0* . N D S SEWER DEPARTMENT STOPPAGE OF SANITARY SEWER MAIN REPORT DATE:-8 — AS7 7.2, TIME CALL RECEIVED: LOCATION OF STOPPAGE: 0,'j -'2 6 -2 1 P L,1-1 TIME OF ARRIVAL ON THE JOB SITE: c/:' �/o TIME NORMAL,FLOW OF SANITARY IEWER REESTABLISHED: 9�'7-0 -t-- CAUSE OF STOPPAGE: 7 eq r -0 u jw 0 C";-4 'c-& C) cc) ,--I k?�� L4 7-0 ACTION REQUIRED TO CLEAR,MAIN AND/OR LATERAL: ij, — C/I /7— c-�A r R U/,/v /-j C, t:E� (- (-- L-,, 14 c-- ;:r- r7_-7q /2 CITY CREW ON STOPPAGE CALL OUT (Personnel Involved): R r LOCATION OF RESIDENCE AFFECTED: IL NAME, ADDRESS, AND PHONE NUMBER OF PROPERTY OWNER: G c:::fz- I- G' L-A -21 t1-0 2 *7 n- C-J DESCRIBE.DAMAGE TO PRIVATE PROPERTY: /9/ C, 7-7 )4Z— F- r- REMARKS: /0 c L./.-" tEjo /'%j r::=-v yt- -r-c) t- tET- IT C-) kE L/ QpA.— b 4 — C,-jA-f zc/ 0 to t- �2 t) L.,-j A,) t— Z' ton tZ- "�Xj r ATE RECEIVED —1 FPERMIT 7—/ 3---CD EXPIRES CITY OF EDMONDS USE PERMIT ZONE N U M B E R rll?("�N - e� J013 ­7 *111, 9 SVITE/APT# ADDRESS 7 e-"140 -6- r::5�ed Wes r CONSTRUCTION PERMIT APPLICATION CON4 OWNER 7AME/NAME OF BUSIN 0 NER Am E' W ,�SS 7 F PLAT NAM EISUBDIVI SION NO. LOT NO. LID NO. / IS 5 hwss"S,'A PAM'p-lAw LID FEE $ cc Uj u.?zJ3 z 31. MAI ADDR MAIL NG ADDRESS PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP TESCP Approved Aw Permit 0 EXISTING PROPOSED Zerqu4ired In R Street Use Permit Req'd Inspect on Required Sldewa:k Required CITY ZIP TELEPHONE 1pi g-, OW-36 REQUIRED DEDICATION FT Unde vvIrIng'gr'.0qUuidred NAME METER SIZE LINE SIZE NO. OF FIXTURES PRV REQUIRED YES 0 No 0 Aj ADDR)SS A v�r IVV' REMARKS OWNER/CONTRACTOR RESPONSIBLE FOR EROSION CONTROUDRAINAGE z z 0 z W c2.3 Y-J CITY ZIP EPHONE "(s) 77 -V 1410P xxl'�J_ NAME 01 Inh) t y f R 'EVIE ENGINEERING 'YVE�PATE ADDRESS CC 0 FIRE�' DATE 'REVIEWED BY uj l'- z CITY ZIP TELEPHONE LL 0 VARIANCE OR CU —VIEW SHORELINE 0 R(ow INSPECTION oREO 'D BOND IPOSTED STATE LICENSE NUMBER EXPIRATION DATE CHECKED BY &,g§ 0 NO SEP_A_ RE COMPLETE EXE�PT SIGN AREA ALLOWED PROPOSED HEIGHT ALLOWED PROPOSED PROPERTY TAX ACCOUNT PARCEL NO. UJI I I _j oo, EXP Cjl�.VEW RESIDENTIAL PLUMBING MECH x LOT COVERAGE ALLOWED PROPOSED REQUIRED SETBACKS (FT.) FRONT SIDE REAR PROPOSED SETBACKS (FT.) FRONT UR SIDE REAR F-1 ADDITION COMMERCIAL Ej COMPLIANCE OR CHANGE OF USE 3 z z PARKING REQ'D PROVIDED LOT AFIEAJPLANNING REVIEWED BY D T REMODEL "APARTMENT SIGN REPAIR C] GRADI FENCE - tYDS 0 J��e X FT) REMARKS DEMOLISH 0 TANK C] OTHER 70 mA7z'A) o GARAGE ROETAINING WALL RENEWAL CARPORT R CKERY %) oci., (L (TYPE OF USE BUSINES CTIVITY) EXPLAIN: It. _FCRITICALPj6dVW,0 CHECKED BY ITYPE OF CONSTRUC ION OCCUPANT GROUP V— NUMBER NUMBER OF SPECIAL INSPECTOR JAREA OCCUPANT OF DWELLING AREAS REQUIREDE] LOAD 0 STORIES U NUMBER !2q-2j 4p- YES DESCRIBE WORK TO BE DONE REMARKS PROGRESS INSPECTIONS PER UBC 108/FINAL INSPECTION REO'D 4- 4VJ-1 Sla'. k VALUATION FEE PLAN CHECK FEE _Tj HEAT SOURCF___T_ GLAZING % LOT SLOPE % BUILDING 000 PLAN CHECK NO' VESTED DATE PLUMBING 00 —.3 0_3 MECHANICAL THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC GRADING/FILL DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. 5U STATE SURCHARGE 1r Cc PERMIT APPLICATION: 180 DAYS W 1. 0. PERMIT LIMIT: 1 YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS ENG. REVIEW FEES SEE BACK OF PINK PERMIT FOR MORE INFORMATION ENG. INSPECTION FEE (A *APPLICANT ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESORS LU IN INTEREST, AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF LANDSCAPING _j 2 EDMONDS, WASHINGTON, ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND INSPECTION FEE M ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY RECEIPT FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE PLAN CHECK DEPOSIT DEEMED TO MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE _j 0 NOR LIMIT IN ANY WAY THE CITY'S ABILITY TO ENFORCE ANY ORDINANCE PROVISION." RECEI T If 1 WW TOTAL AMOUNT DUE P7 --lc P-2 7 I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION APPLICATION APPROVAL GIVEN IS CORRECT, AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC- CALL This application is not a permit until signed by the TION; AND IN DOING THEYORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED Building Official or his/her Deputy: and Fees are paid. and IN VIOLATION OF THE'IfABOR CODE OF THE STATE OF WASHINGTON RELATING TO FOR INSPECTION receipt is acknowledged in space provided. CO�� DATE WORKMEN F ION,!NSURANV'�1`4D RCW 18.27. OFFICI" SIGNA SIGNATUF 09,A4�NT/ DAT�E41GYED (425) 4/n/o/ [;E' 771-02dLV RELEASI�D BY DATE A NTIOW / �1"r - EXTJ333 ­"j I/` . ? 1 7. _; IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL 771-0221 A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- ORIGINAL -FILE YELLOW- INSPECTOR CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 FAX PINK - OWNER GOLD - ASSESSOR 5/98 DATE RECEIVED PERMIT EXPIRES CITY OF EDMONDS USE PERMIT Z 0 N E 4. 49 nxi NUMBER JOB SU ! TE/APT ADDRESS 7 "7 CONSTRUCTION PERMIT APPLICATION OWN�R NAME/NAME OF BUSINESS PLAT NAM E/SU BDIVI SION NO. LOT NO. LID NO. LID FEE $ cc MAILING ADDRESS PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP TESCP Appmed 0 RW Permit Required U1 z 1" 1" q 0 EXISTING PROPOSED- 7 Street Use Permit Req'd 0" Inspection Required Sidewalk Required CITY ZIP TELEPHONE 7n�, 7 REQUIRED DEDICATION FT Und rground a Wir ng required NAME METER SIZE LINE SIZE NO. 9,F FIXTURES PRV REQUIRED 0 Q YES ,(�p NO .9 uu W ADDRESS 0 REMARKS EROSION CONTROUDRAINAGE z z OWNER/CONTRACTOR RESPONSIBLE FOR a L) z W 4 in CITY ZIP TELEPHONE 71 A NAME 17) kfj i VREVIEWED/DATE ENGINE�RING �.t, ZI �_OmK, ADDRESS "'Id 0 Flptv�`RE D�TE '�I EhED z CITY ZIP TELEPHONE I )x ILL 0 �kARI ANCE OR CU SHORELINE �?� - , -, , INSPECTION .�, REO'D BOND POSTED STATE LICENSE NUMBER EXPIRATION DATE CHECKED BY ­­­­.- I 7,�� E3,YES C] NO SEPA REVIEW COMPLETE EXEMPT SIGN AREA ALLOWED PROPOSED HEIGHT ALLOW ED PROPOSED PROPERTY TAX ACCOUNT PARCEL NO. W 7 4. I , -ji — EXP RESIDENTIAL NEW PLUMBING MECH LOT COVERAGE ALLOWED, PROPOSED REQUIRED SETBACKS (FT.) FRONT SIDE REAR PROPOSED SETBACKS (FT.) FRONT URSIDE REAR o COMPLIANCE OR F-1 ADDITION COMMERCIAL /0 z z CHANGE OF USE PARKING LOT AREA PLANNING REVIEWED BY DATE REMODEL APARTMENT E] SIGN RT�D PR�,,VIDED 4 �(, 0. REPAIR GRAT FENCE CYDS fut ( X FT) REMARKS f OTHER F-1 DEMOLISH TANK GARAGE RETA' NING WALL RENEWAL CARPORT. ROC KERY cc 4 (TYPE OF USE. BUSINESS OR ACTIVITY) EXPLAIN: P: CHECKED BY TYPE OF CONSTRUCTION CODE OCCUPANL. GROUP 0. NUMBE�_ OF NUMBER OF DWELLING CRITICAL -14 AREAS w M SPECIAL INSPECTOR REQUIRED A, OCCUPANT LOAD 0 STORIES 411k, UNITS NUMBER YES Z., DESCRIBE WORK TO BE DONE REMARKS z PROGRESS INSPECTIONS PER LIBC 108/FINAL INSPECTION REQ'D j `7 VALUATION FEE PLAN CHECK FEE HEAT SOURCE GLA ING% LOT SLOPE % BUILDING Zt. PLAN CHECK NO: VESTED DATE PLUMBING . ..... . MECHANICAL THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO t BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC GRADING/FILL DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. STATE SURCHARGE PERMIT APPLICATION: 180 DAYS w PERMIT LIMIT: 1 YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS ENG. REVIEW FEES SEE BACK OF PINK PERMIT FOR MORE INFORMATION ENP, I�SP I�N FEE "APPLICANT, ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESORS ,�T uj IN INTEREST, AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF i LANDSCAPING 2 EDMONDS, WASHINGTON, ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND INSPECTION FEE ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY RECEIPT FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE PLAN CHECK DEPOSIT Z DEEMED TO MOD IFY, WAIVE OR REDUCE ANY REQUIREMENTOF ANY CITY ORDINANCE _j 01 NOR LIMIT IN ANY WAY THE CITY'S ABILITY TO ENFORCE ANY ORDINANCE PROVISION.- RECEIPT- 4 TOTAL AMOUNT DUE we I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION APPLICATION APPROVAL GIVEN IS CORRECT., AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC- CALL This application is not a permit until signed by the TION; AND IN DOING THE WORK,AUTHORIZED THEREBY, NO.PERSON WILL BE EMPLOYED Building Official or his/her Deputy: and Fees are paid. and IN VIOLATION OF THE LABOR CODE OF THE STATE, OF WASHINGTON RELATING TO FOR INSPECTION receipt is acknowledged in space provided. WORKMEN'S C? IN�IURANCE AND RC%Y,18.27. 4 ...��SATION OFFICIA�S SIGNATURE j DATE SIGNATU DATE (425) REif( NER' R AGENT) .�!GNED (A. ,4- 1 77-0220 a, RELEASED BY DATE AT,,TENTION EXT1333 IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL 771-0221 A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- ORIGINAL - FILE YELLOW - INSPECTOR CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 PINK -OWNER GOLD - ASSESSOR FAX 5/98 vx, City of Edmonds RIGHT-OF-WAY CONSTRUCTION PERMIT A. Address or Vicinity of 2_1.40� _):5rPf11 L-3. Permit No: Issue Date: 7— B. Type of Work (be snecific):'UT1 L4 T11, PM 106 16E, 4VPWC-0 OW-5 dA1, L.- FOR- 1 4*1 S. C. Cbntractor�j H15 T:% C�4VA I.Va Contact: �0% D -0 0 r Mailing Address: 30%.11 Lt'rr).e D,e.A;r Phone:':20 C .3 State License #:1TH,5F Liability Insurance: Bond: $ D. Building Permit # (if applicable): Side Sewer Permit # (if applicable): E. F1 Commercial F1 Subdivision E] City Project EUC (PUD, VERIZON, PSE, AT& T, OVWD) Multi -Family E] Single family Other INSPECTOR: F. PAVEMENT CUT: [__1 YES El NO G. SIZE OF CUT x CONCRETE CUT: [J YES El NO Al'I'LICANT TO IZI,Al) ANI) SIGN INDEMNITY: Applicant understands by his/her. signature to this application helshe holds the City of Edmonds harmless ftom i . nj . uri . es, damages or claims of any kind or description' whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the efgnse of any legal proceedings including defense costs and attor'neyfeesby reason ofgranting this permit. THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOILOWING THE FINAL INSPECTION AND ACCEPTANCE OF THE WORK ESTIMATED RESTORATION FEES 47LL BE HELD UNTIL THE FINAL STREET PATCH IS COMPLETED BY CITY FORCES, AT WHICH TIMEA DEBITOR CREDIT 97LL BEPROCESSED FORISSUANCE TO THE -APPLICANT. * Traffic. control and public safety shall be in accordance with City regulations as required by the City Engineer. Every 'flagger must be trained as required by (WAC) 296-155-305 and must have certification verifying completion of the required training in their possession. * Restoration is to'be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City - approved material prior to the end of the workday — 140 EXCEPTIONS. * Three sets of construction drawings of proposedwork are required with the permit application. CALL DIAL -A -DIG (1-800-424-5555) PRIOR TO BEGINNING WORK I HA VE READ THE ABOVE STATEMENTS AND UNDERSTAND THE PERMIT REQUIREMENTS AND ACKNOWLEDGE THA TI MUSTMAKE THE PINK COPY OF THE PERMITA VAILABLE ONSITEA TALL TIMES FOR INSPECTIONS Signature: Date: **bO�2 or Agent) W F 'CITY USE ONLY OR, Approved by: Right-of-wayFee:770 45 Tim , e Auth(irized;,Void After WgrA Disruption Fee/Fund 111: Special Conditions�.'6�w F04 105W'Mxt ftl!�" estoration Fee: A­ AxM 1P_qV:PO4S K00 f**6 P0044tY4 . Total Fee: P U ST em & A U %, AA00799 —1 AA;i6 e*J62AJ KAI_� Receipt No:__&r/)z.9 .08kJ6 10 Ift'W - IvI 9TkW n6 tA-1 lU11 CX PA)Iv8 1 Issued br.- UPON COMPLETIONOF PERMITTED WORK, AN ENGINEERING FINAL INSPECTION IS REQUIRED PER CHAPTER 18.00 Of THE EDMONDS COMMUNITY DEVELOPMENT CODE (Phone 42,5-771-0220, Ext. 13,A6) FINAL APPROVAL OFPERMITTED WORK. DATE:1V,-LJQ3_ Inspector's Signature For inSDection reauirements see Information handout. 11103 IS Koff ff IMN MT M. DAMy Documents\Forms\Engnmg\ROWpermit—.doc W 001 on 1: 1 :4 - 010- WN ? F: Us: SAM CHEN 15421 56th A\/f=NUE 5E BOTHELL, INA51­11N&TON claOI2 (20(b) -711-1515 LEGAL DESCRIPTION 5ECTION 2f-i TOM5HIF 2-T RAN&E 04 OUARTER NI/4 LU5CHEN5 TRACT5 Dl\/ 5 BLK 000 D-Ol TH FTN LOT 5 5D FLAT BEIN& MORE PARTICULARLY DAF BE& 5Vq COR 5D LOT 5 TH NOO*51 05Yi ALC7 Yq LN 5D LOT P15T 4a.45FT TAFCR\/ TH NELY AL6 OR\/ To L HA\/6 RAD BEAR N4cl*06101N O/A 45*25'42" RAD 40.00FT DIST 51.71FT TH Na5*25 Oe)E 64.8-IFT THSOO*25 54E 65.8-IFT TH Ne?1*15 45Y4 '14.45FT TO FOB AKA UNIT LOT A CITY OF r=r?M 55D No. 5- 05-55 REC AFN 20050'7015005 SITE ADDRESS 2150-1 '75rd PLACE NE5T ZONING RM-2.4 TAX ACCOUNT NUMBER 00501500000501 LOT AREA 5662 50UARE FEET LOT COVERAGE CALCULATION NO CHAN65E I f1j, a-3 11:01=111 LIVIN6 AREA 1240 SQUARE FEET MAIN LEVEL LIVIN(5 AREA c`125 SQUARE FEET LONER LEVEL LIVIN6 AREA 4125 SQUARE FEET TOTAL GARA&E 252 SQUARE FEET DECK 1012 SQUARE FEET � I 0L "D x0el m 01 A-1 51TE PLAN, FROJECT DATA AND INDEX OF DRANIN65 A-1.1 EXTERIOR EI_F_V`ATION5 A-2 UPPER LE\/EL FLOOR PLAN A-5 LONER LEVEL FLOOR PLAN A-4 DETAIL5 (IS 10'7 9 1011 1 W 1 21�071 VO I I I ILL11 Im 0 106 SITE P"LAN SCALE. I" = 10'-0" NORTH M** .55o2a,5,yj 151.641 5 R tn cl Comer Flaa �_C.tbacks_ —Asl L La I Front Sides J%cr Rear Other 1- Lciqj'�_t RANDALL J. MUNSON BUILDING DESIGNER 17713 15TH AVENUE NORTHEAST SUITE 102 SHORELINE WASHINGTON 98155 (206) 349-4551 randy.munson@comcast.net COPYRIGHT NOTICE THIS PLAN IS ISSUED FOR CONSTRUCTION PURPOSES BY THE CLIENT INDICATED. REPRODUCTION OR USE OF THIS DOCUMENT WITHOUT THE EXPRESS WRITTEN CONSENT OF DESIGNER, RANDALL J. MUNSON, IS PROHIBITED. DESIGNER MAINTAINS ALL RIGHTS UNDER STATE AND FEDERAL LAW, INCLUDING COPYRIGHT. CONTRACTOR NOTICE CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AT THE JOB SITE AND NOTIFY THE DESIGNER OF ANY DIMEN- SIONAL ERRORS, OMISSIONS OR DISCREPANCIES BEFORE BEGIN- NING OR FABRICATING ANY WORK. DO NOT SCALE DRAWINGS. REVISIONS No. Date Item CITY OF EDMONDS 2L 10.13.14 CORRECTIONS #1 CITY OF EDMONDS A2 07.17.15 CORRECTIONS #1 z 0 F_ 0 z _r U) z 0 LL 0 2 c\I T_ 0 00 0) z U) LLJ :D Z z _r z LLJ U) 00 Lu < , 0c) cz), 0') C0 ED T_ c\l U 00 00 ) , co 'c\'j ITE PLAN, GENERAL NOTES, PROJECT DATA and INDEX OF DRAWINGS PROJECT NO. :14.116 DESIGN RJIVI DRAWN RJIVI ISSUE DATE :07.31.14 J F .. . . .... .. 11% NW 1/4) NW 1/4, SECTION 2, TOWNSHIP 27 NORTH, RANGE 4 EAST, W.M. EX DRIVE EX POWER POLE OHP- - — — — — — — — — — — — — \\'� -------------------- EV ACOUAI T VW'C' BENCHMARK CB TOP MONUMENT EL=100 S89' 1 5'30"E (ASSUMED) 0 215TH ST SW I Ln 0 El SSMH� 0 18.30.050 Development approval standards for erosion and sedimentation 0 C control (ESQ plan. A. ESC Minimurn Requirements. All activities necessitating a clearing or grading permit and all utility nroiects consistina of more than 500 lineal feet of trench excavation shall be required to control erosion and sediment during construction and to permanently stabilize exposed soil resulting from construction. Projects involving a critical area may also be required to comply with any combination of the ESC minimum requirements. Compliance will be demonstrated through the implementation of an approved ESC - W — — L plan. Guidelines for preparing ESC plans are provided in the manual. The plan must address the following i�quirements: EX CB EX CB EX WATER VALVE 1. ESC Minimum Requirement - Construction Access Route. Construction vehicle access shall be, whenever practical, limited to one route. Access points shall be stabilized with quarry spalls or crushed— — — SD rock to minimize the tracking of sediment onto public roads. If sediment is transported onto a road surface, the roads shall be cleaned thoroughly at the end of each day. Sediment shall be removed from roads by shoveling or sweeping and be transported to a controlled sediment disposal area within 24 hours. Street washing shall be allowed only after sediment is removed in this manner. in 2. ESC Minimum Requirement - Stabilization of Exposed Areas. All soils exposed by land disturb g activities shall be stabilized by suitable application of BWs, including, but not limited to, sod, hydroseeding, or other vegetation, plastic covering, or mulching. All BMPs shall be selected, designed, and (n maintained in accordance with the manual. The exposed soils shall be stabilized according to an approved timetable. (Typically, no soils shall remain exposed for more than two days from October I through April PROVIDE TEMP CH 30 and no more than seven days from May I through September 30). BASIN PROTECTION 0 DURING CONSTRUCTION 3. ESC Minimum Requirement - Protection of Adjacent Properties. Adjacent properties shall be protected from sediment deposition by appropriate use of vegetative buffer strips, sediment bwTiers or filters, dikes or mulching, or by a combination of these measures and other appropriate BMPS. 4. ESC Minimum Requirement - Maintenance. All erosio n and sediment control BMPs shall be regularly I inspected and maintained by the owner to ensure continued performance of their intended flinction. All maintenance and repair shall be conducted in accordance with the manual. 5. ESC Minimum Requirement - Other BMPs. As required by the city, other appropriate BMPs to mitigate the effects of increased runoff shall be applied. C9 6. Erosion and Sediment Control Requirement 6 Underground Utility Construction. The construction of underground utility lines shall specifically address the following: a. Erosion control for excavated and stockpiled materials; EX CB b. The placement of excavated material where consistent with safety and space considerations shall be placed on the uphill side of trenches; c. Trench dewatering systems (must discharge into sediment traps, sediment ponds, or other acceptable means); ry FDGP d. Tracking and spilling of materials on streets due to hauling; I ASPHALT U) e. Daily cleanup and street maintenance. V) 7. Additional ESC Minimum Requirements for Larger Developments. All new development and redevelopment that includes land disturbing activities of greater than, or equal to, one acre in addition to EX 8" WATER — meeting the minimum requirements set forth above shall comply with ESC requirements listed below. 8. ESC Minimum Requirement - Delineate Clearing and Easement Limits. In the field, mark clearing limits and/or any easements, setbacks, sensitive/critical areas and the buffers, trees and drainage courses. 9. ESC Minimum Requirement - Sediment Trapping. Prior to leaving the site, storm water runoff shall pass through a sediment pond or sediment trap, or other appropriate BMPs. Sediment ponds and traps, perimeter dikes, sediment barriers, and other BMI?s intended to trap sediment on -site shall be constructed as a first step in grading. These BMPs shall be functional before land disturbing activities take place. Earthen 30' R/W- structures, such as dams, dikes, and diversions shall be seeded and mulched according to an approved 30' R/W timetable. V) 10. ESC Minimum Requirement - Cut and Fill Slopes. Cut and fill slopes shall be designed and constructed in a manner that will minimize erosion. In addition, slopes shall be stabilized in accordance with ESC Requirement No. 2. 11. ESC Minimum Requirement - Controlling Off -Site Erosion. Properties and water ways downstream from development sites shall be protected from erosion due to increases in the volume, velocity, and peak flow rate of stonn water runoff from the project site. 12. ESC Minimum Requirement - Stabilization of Temporary Conveyance Channels and Outlets. All temporary on -site conveyance channels shall be designed, constructed and stabilized to prevent erosion from the expected velocity of flow from a two-year, 24-hour frequency storm for the developed condition. Stabilization adequate to prevent erosion of outlets, adjacent stream banks, slopes and downstream reaches shall be provided at the outlets of all conveyance systems. 13. ESC Minimum Requirement - Storni Drain Inlet Protection. All storm drain inlets made operable EX ASPHALT EDGE during construction shall be protected so that storm water rursoff shall not enter the conveyance system V.- I- I— �r_14­ A + A +_ I,— + without st e g OL V V1 W aW ta Va V, A VILLAUV %I OV VA. . I 1 1 14. ESC Requirement - Removal of Temporary BMPs. All temporary erosion and sediment control BMPs I shall be removed within 30 days after final site stabilization is achieved or after the temporary BMPs are I no longer needed. Trapped sediment shall be removed or stabilized on site. Disturbed soil areas resulting 3: from removal shall be permanently stabilized. 15. Erosion and Sediment Control Requirement - Dewatering Construction Sites. Dewatering systems shall discharge into a sediment trap or sediment pond. 16. Erosion and Sediment Control Requirement - Control of Pollutants other than Sediment on EX FIRE HYDRANT Construction Sites. All pollutants other than sediment that occur on site during construction shall be handled and disposed of in a manner that does not cause contamination of storm water. 17. Erosion and Sediment Control Requirement - Financial Liability. Performance bonding, or other �appropriate ancial instruments, shall be required for all projects to ensure compliance with the approved erosion and tsediment control plan. [Ord. 3013 § 1, 1995). APPROVED FOR o')T ?rJSrTBU0T'ON City Engigeer Date A J_ t- I I I I I F- N 12 -T- A -7 L F I I-- I N lklel"rAl I 'rr-kJM^MAM\J n/%f%1/ EX FENCE TO REMAIN CONSTRUCTION SEQUENCE 1) Schedule and attend pre -construction meeting with city inspector. 2) Call 1-800-424-5555 for utililies locate. 3) Install temporary filter fabric fence along perimeter of site as shown on plan. 4) Install temporary rock constnction on entrance. 5) Install temporary inict proteciion for all catch Basins in the vicinity of protect which might get effected by construction actiNities. 6) Temporary erosion and sedinentations control measures shown are minimum required. As construction progresses and vnexpected (seasonal) conditions dictates, more siltation control facilities may be required. It shall be the responsibility of the contractor to address any new conditions that may be created by his constriction activities. 7) Clear site within clearing limits while maintaining the temporary Erosion and sedimentation control measures. 8) Stabilize and protect disturbcd areas as soon as possible. 9) Grade site in accordance I to approved plans. Limit exposed disturbed soil to 24 hr from Nov I through April 30 and 5days from May 1 to Oct 3 1. Exposed soil must be protected by temporary control measures such as mulching, seeding, plastic covering during construction and also at the threat of rain. 10) Retain sediment within projcct site. 11) No sediment shall be trackee into the public street or on to paved surface. Sediment shall be removed from trucks and eqdpment prior to leaving site. In the event of failure and transport of sediment onto paved surfice, street sweeping shall be employed. 12) Install utilities in accordance to approval plan. All trench bedding and bectill shall be in accordance to city standards. 13) Stabilize and hydro seed / laidscape exposed areas. 14) Maintain TESC facilities unlil all risk of erosion / sedimentation has passed. Do not convey sediment -laden water into st)rm drainage system. TESC facilities to be removed upon final site stabilization and inspection. F—\ I \ / L_J I V ILW-VAI I -rr1JMfNnAnV r1l TrM N I r-\ CONS Jneer CTk LEGAL DESCRIPTION" — LOT 5, LUSCHEN TRACTS, DIVISION NO. 3, AS PER PLAT RECORDED IN VOLUME 17 OF PLATS, PAGE 87, RECORDS OF SNOHOMISH COUNTY, WASHINGTON. SITUATE IN THE COUNTY OF SNOHOMiSH, STATE OF WASHINGTON. LEGEND TYPE I CATCH BASIN FIRE HYDRANT WATERMAIN VALVE SANITARY SEWER MANHOLE POWER POLE OVERHEAD POWER LINE MONUMENT SILT FENCE FENCE EXISTING El IQ M 0 0 —OHP— E) X_X_X INSTALL TEMPORARY FILTER FABRIC FENCE PER DETAIL MERIDIAN PLAT 10 5 0 10 20 6monammm! - I - I I GRAPHIC SCALE IN FEET PROPOSED 0! P I EXPIRES 02___1 N AHMADNIA TRIPLEX 21405 73RD PL W NASSAR AHMADNIA SHEET TITLE: TEMPORARY EROSION 77AND SEDIMENTATION PLAN NO. DATE REVISIONS ,ell I fl '\% ow� S-HEET NO. : 7 2 oF 0