215 6TH AVE S.PDF111111111111
5415
215 6TH AVE S
i�
0 . STR- EET FILE'
DATE:-N"Ich, 33L
I
MEMO TO: Harry Whitcutt
I Building Official
FROM: Richard 11. Allen
Assistant City Engineer
SUBJECT:
After review of the subject buildinq permit application, we have the following
comments:
(1) Coordination of the location of any structure with respect to utilities,
streets, property lines and driveway grades is the responsibility of tile
contractor.'
2
The contractor is
and debris caused
uired to keep the abutt
the construction.
streets cleaned of dirt
a
PW 3/77
�
^
��JCv�0� '
.' �_
'— PJ]� --
Street Right-nF'�oy Existing
Access Easements Ezist
Utilit-y- Easement ExistinNXW
g D
*
Lot Pcr Subdivision Plat Assessor rhn 10
Site Ylan Oiodr6 for Accuracy
Review by__ Date -.07
IlYdrant Size J:xisting it
|hGroot Pxluircd °m�f0e Cod
e.
/ ` ,�.`
�)optzc lool� /molf,.n
Septic Tank pcmit Required !'1erMit Mn.___�__
�
3unitury 3erorAruilui`ili
/
Review Pato
q)c11 Pitch Existing —Require(l.
Culvert Required Size
-Open rawo
I Imiliole required Indicate on Site 111m
I.Soil Conditions F, Ground Water Field (1ocked
Dr�uvinC 80. ' FiIo �b.
( �
� |
Street Paving, Required_
C
E-
Curl) and Gutter Required 1409
L-
sidev"alh Require(,
Curlb (lit for Priveway Required
Pi.-lit-of-Irl'ay Construction Permit Reouirc
d
Bond Required, for Public Improvements
Street Naj-.ic Sign Required
Other Sif�ning Required Al)? -
Pro Pcmit Site inspection made on
BY: Smver
Water
Street
Engineering
Special Rcqiiirencnts listed in memo to Building Tk7partment
13 �) 0 9 --- r� —.—Date--
All. items filled in on Building Permit Application
By—
Drawin,-s Stamped and "Otations Ikkadc
By_ Dato—
Approved 1)), Public VIorhs Department
PERMIT ADDRFSS"' co
LEGAL DESCPIPTInN_,
BUILDING PERMIT RFVIEW - ENGINEERING DEPARTMENT C11FCK LIST
Instruction: G Iftf
Check Accuracy of Leqal Description
Check Against Assessor's Map for Legal Subdivision
Does it conform to City Approved Subdivision?
Re v i ev:e r' s
Initials
STREET FILE
1. This lot included in Subdivision/Plat No.:
2. Site Inspection made on:
3. Uhat are oround water and soil conditions?
4.
Site Drainage Checked?
5.
Storm Sevier Availabili
Slit. (;f Ng. No.
Projec
Roadside Ditch
2 n— a
6.
rrading & Final Contours:
7.
Septic Tank System Design Approved:
8.
Sanitary Sevier Availability
Slit 0 f
Project
Side sevier availability:
---
9.
Sanitary Sewer Connection Fees?
10.
Vater Hains "A Fire 11.ydrants
(Indicate Size Main)
Check Fire Dept.'s Comments
I
11.
Sidewalks: (Site inspection
tMi 4--AM,,k 1-n
shows conditions of sidevialks as
follows)
12.
—
Curbs: V?r"!F:7MNN/_4L
—
Curb Cuts/ Dri ve-ways (Check driveways for saf location,
e-t y
grade ar�d vJ'Fdth):'
Ron
ftUX55
13..
Underground 11iring:
A5
Street Liqhts:
14.
Street Riqht-of-%.iay A Rldq.
set'backs-.91W 607�! 1 S h t.
of nfficial Street Map.
15. Existinq Utility Easemc
16. Access Easements:-
17. Site Plan checked for i
18. Special Requirements listed in Hemo to Bldg. Dept.
19. Commercial & Apt. RPOUireflients form completed?-
20. Drawings stamped & notations made?
21. All Items filled in.on Dldg. Permit Application?
22. 199nds posted for site viorle?
23. Right-of-way Invasion Permit required'?
COMMENTS:
AMICATION
The City of Edmoindv- for
'rNT NO . ......... . ..
�EASI�M ... ..................
SIDE SEWER PERNT
NEW CONSTRUCTION REPAIRS LLD NO. ............. 4 ----- NO. ----------------
ASMT
OV. NtR ...... )&alkl- ------------ ............................ CONTRACTOR ........................... . ............................... ...................... PERMIT NO . ..................
JOB A-1) ESS ...... ------------ 50-t ....... ......... LEGAL DESCRIPTION: LOT NO . ........ . ............................ — BLOCK NO.
.. . ............... .
............... . ............... ................................................................... ..........................................................
NAMEOF ADDITION .................................................. ............ .................................. .......................
We K
I n
Approve&
DATE....................................... ... ��-'By ...............................................................
REGARDING:
215 - 6th Avenue
South
lo3- 1�o_5nn
Ta—dTr—e—s 7s
'ET
FILE
R E C 0 R
D 0 F C 0 N T A
C T S
DATE
NME, PHONE NO. &
ADDRESS of C��
COMMENTS
ACTION TAKEN
5/l/74
Hubbard Realty
Certified
Letter No. 406414 sent
Letter rec&ived.
requiring
hook-up within 60 days.
5/10/74
Mr. Carey from
Occupants
—Cooks. Please arrange
D.T.O.S.
Hubbard Realty
for dye test through Hubbard.
6/14/74
Certified
Letter No. 406495 sent
Letter received.
rescinding previous letter.
INITIALS
TE
TE
TE