Loading...
215 6TH AVE S.PDF111111111111 5415 215 6TH AVE S i� 0 . STR- EET FILE' DATE:-N"Ich, 33L I MEMO TO: Harry Whitcutt I Building Official FROM: Richard 11. Allen Assistant City Engineer SUBJECT: After review of the subject buildinq permit application, we have the following comments: (1) Coordination of the location of any structure with respect to utilities, streets, property lines and driveway grades is the responsibility of tile contractor.' 2 The contractor is and debris caused uired to keep the abutt the construction. streets cleaned of dirt a PW 3/77 � ^ ��JCv�0� ' .' �_ '— PJ]� -- Street Right-nF'�oy Existing Access Easements Ezist Utilit-y- Easement ExistinNXW g D * Lot Pcr Subdivision Plat Assessor rhn 10 Site Ylan Oiodr6 for Accuracy Review by__ Date -.07 IlYdrant Size J:xisting it |hGroot Pxluircd °m�f0e Cod e. / ` ,�.` �)optzc lool� /molf,.n Septic Tank pcmit Required !'1erMit Mn.___�__ � 3unitury 3erorAruilui`ili / Review Pato q)c11 Pitch Existing —Require(l. Culvert Required Size -Open rawo I Imiliole required Indicate on Site 111m I.Soil Conditions F, Ground Water Field (1ocked Dr�uvinC 80. ' FiIo �b. ( � � | Street Paving, Required_ C E- Curl) and Gutter Required 1409 L- sidev"alh Require(, Curlb (lit for Priveway Required Pi.-lit-of-Irl'ay Construction Permit Reouirc d Bond Required, for Public Improvements Street Naj-.ic Sign Required Other Sif�ning Required Al)? - Pro Pcmit Site inspection made on BY: Smver Water Street Engineering Special Rcqiiirencnts listed in memo to Building Tk7partment 13 �) 0 9 --- r� —.—Date-- All. items filled in on Building Permit Application By— Drawin,-s Stamped and "Otations Ikkadc By_ Dato— Approved 1)), Public VIorhs Department PERMIT ADDRFSS"' co LEGAL DESCPIPTInN_, BUILDING PERMIT RFVIEW - ENGINEERING DEPARTMENT C11FCK LIST Instruction: G Iftf Check Accuracy of Leqal Description Check Against Assessor's Map for Legal Subdivision Does it conform to City Approved Subdivision? Re v i ev:e r' s Initials STREET FILE 1. This lot included in Subdivision/Plat No.: 2. Site Inspection made on: 3. Uhat are oround water and soil conditions? 4. Site Drainage Checked? 5. Storm Sevier Availabili Slit. (;f Ng. No. Projec Roadside Ditch 2 n— a 6. rrading & Final Contours: 7. Septic Tank System Design Approved: 8. Sanitary Sevier Availability Slit 0 f Project Side sevier availability: --- 9. Sanitary Sewer Connection Fees? 10. Vater Hains "A Fire 11.ydrants (Indicate Size Main) Check Fire Dept.'s Comments I 11. Sidewalks: (Site inspection tMi 4--AM,,k 1-n shows conditions of sidevialks as follows) 12. — Curbs: V?r"!F:7MNN/_4L — Curb Cuts/ Dri ve-ways (Check driveways for saf location, e-t y grade ar�d vJ'Fdth):' Ron ftUX55 13.. Underground 11iring: A5 Street Liqhts: 14. Street Riqht-of-%.iay A Rldq. set'backs-.91W 607�! 1 S h t. of nfficial Street Map. 15. Existinq Utility Easemc 16. Access Easements:- 17. Site Plan checked for i 18. Special Requirements listed in Hemo to Bldg. Dept. 19. Commercial & Apt. RPOUireflients form completed?- 20. Drawings stamped & notations made? 21. All Items filled in.on Dldg. Permit Application? 22. 199nds posted for site viorle? 23. Right-of-way Invasion Permit required'? COMMENTS: AMICATION The City of Edmoindv- for 'rNT NO . ......... . .. �EASI�M ... .................. SIDE SEWER PERNT NEW CONSTRUCTION REPAIRS LLD NO. ............. 4 ----- NO. ---------------- ASMT OV. NtR ...... )&alkl- ------------ ............................ CONTRACTOR ........................... . ............................... ...................... PERMIT NO . .................. JOB A-1) ESS ...... ------------ 50-t ....... ......... LEGAL DESCRIPTION: LOT NO . ........ . ............................ — BLOCK NO. .. . ............... . ............... . ............... ................................................................... .......................................................... NAMEOF ADDITION .................................................. ............ .................................. ....................... We K I n Approve& DATE....................................... ... ��-'By ............................................................... REGARDING: 215 - 6th Avenue South lo3- 1�o_5nn Ta—dTr—e—s 7s 'ET FILE R E C 0 R D 0 F C 0 N T A C T S DATE NME, PHONE NO. & ADDRESS of C�� COMMENTS ACTION TAKEN 5/l/74 Hubbard Realty Certified Letter No. 406414 sent Letter rec&ived. requiring hook-up within 60 days. 5/10/74 Mr. Carey from Occupants —Cooks. Please arrange D.T.O.S. Hubbard Realty for dye test through Hubbard. 6/14/74 Certified Letter No. 406495 sent Letter received. rescinding previous letter. INITIALS TE TE TE