Loading...
21730 95TH AVE W.PDFiiiiiiiiiiii 9284 21730 95TH AVE W i STREET FILE Da te March 28. 1977 Memo to: Director of Maintenance �.- Operation ' "k Public Woi- S From: City Engineer Subject: Sewer Connection Charges i Legal Description: Lot 9) R. C. Munger Addition No. 3, as recorded in Voilume 16, page 36 of Plats, Records of Snohomish County, Washington. Commonly known as: Owner: 21730 95th Ave. W.- Wilma Lutz Z.F.F. Calculation: 75 Z . F. F. x $5. so Lateral X Unit x $25 7, b OF CC: owner $ 412. 50 Connection Fee $ -0- Lateral Charge $ 25.00 Trunk Charge $-l_Q. 0 0 Permit 447.50 TOTAL 2108 Da to March 28. 1977 STREET FILEF 0 Memo to: DirecLoi:- of Maintenance ,, 01..)cration Public Works From: City Engineer Subject: Sewer Connection Charges Legal Description: Lot 9, R. C. Munger Addition No. 3, as recorded in Volume 16, page 36 of Plats, Records of Snohomish -County, Washington. Commonly known as: 21730 95th Ave. W. Z.F.F. Calculation: 75 Z.F.F. �x $5.50 Lateral X Unit X $25 CC: owner Owner: Wilma Lutz $ 412.50 Connection Fee $ -0- Lateral Charge $ 25.00 Trunk Charge $_10.00 Permit 447. So. TOTAL 2108 (77 8 9 +8 S) elAleo C—.Z ..A/ 09� -P4-09 75 7-,e VAIA (:�A14Z a E!- #2 S. VtO V 77 <jFwex CA44 Lgaokotw 000 --D 'Zo LOT 13,0 ow- 95 'mr-w LM X u-T i:E:7 I NOTICE, N ---W"a'r.ran ... y ... of 'o at'on -shown on the a-ttached The inform I for use by the CitY 01 map(s) was compiled Edmonds,; its Empl.oyees and Consultants. Th,..e City of *Edm.onds does * not . warrant the orth on these accuracy of anything set f Map(s). An . y person or entity -requesting a copy should conduct an independent inquiry regarding the inform-ation shown, c -m a p (S) j including, but not Jimited to, the location of any sewer stub shown. Su( not exist and ma�, sewer stubs may or m3y t at the location shown, or may not exis Nelt-heir the City of Edmon(NJAS/ nor itS hall be I.-Ja-b-1--e fc)r th emptoyee-s Of office-rs -s inforrnation given on this map(5), nor for presentation provided based any one re upon said. m a p (S' CITY OF EDMONDS - SIDE SEWER PERMIT WATER -SEWER DEPARTMENT PERMIT Call 775-2525 for side sewer inspections BEFORE covering any portion of the construction.) Inspection will be provided within 24 hours after requst. NO Sat., Sun., or holiday inspections. ADDRESS LOCATION OF CONSTRUCTION ------ t A Q7_i­­­ ....................................... ..................... . ........... .. PROPERTY LEGAL DESCRIPTION ------------ - .. ......... ��. I A.T—'.' -- — -------------------- ......... ................................................................... ...................... . ........................... ...................... . .................................................... . .................................. . .............. ................... . .................................................. ................................................................. OWNER AND/OR BUILDER .... Lu 4— ............ . ........................................................ CONTRACTOR'S NAME ADDRESS ---------- L --------------- ------ 1=_�­ ---------------------------­ ----------- ­­­ ................................................... -Perm1ssionisgran._____.__ ------------ - ------------ 19 -., for repair and/or connection of a side sewer to the city sanitairy sewer "\,Si !!�i in accordance with City of Edmom&—ordinances. .-i'rENTION IS CALLED TO THE FOLLOWING: NOTE No. 1—The owners of the property may obtain a permit to construct sewer inside property line. A licensed Side Sewer Contractor must be employed to construct side sewer in street area. Do not cover any portion of sewer before It has been inspected. NOTE No. 2—All work performed in city right-of-way requires an Invasion of Right -of -Way Permlt obtainable from the City Engineer's office. NOTE No. 3--Obtaln full information regarding Ordinance 11.16.030 and Regulations governing side sewers when you get permit. NOTE No. 4—Top of side sewer must have at least 30 inches coverage at property line and 12 inches inside property line; minimum grade of 2%. No bends in grade sharper than % will be permitted. NOTE No. 5--Trenches in street must be water settled and surface of street restored to original condition. Contractors shall be responsible for failure due to improper work which may develop within one year of completion. NOTE No. 6—It is unlawful to alter or do any other work than is provided for in the permit, or to do any work on the main sewer or its appurtenanew except to in- sert the pipe into the wye. DISAPPROVED0 Date ---- -------- ......... .... By ................ Date. ........... By ................ Date ............... . ................... 'BY ................ ......... ..... --. / . ...... 7 ......................... By - APPROVED ;'--Da �./ 7, ------- Remarks: ....... . .................................. . .. . ................................................................................................... .............. ..................................................................... . ........................ ............................................................... . ................................... ............................................. ......... BOWTHC MUST Signe Owner Firm Performing Construction PRIOR To Request For Inspection MU ......... ... her r,�c I ......... . .......... . ...... ............................................... .... hereby certify that the side sewer installation constructed under this permit r of Cc racting Firm Performing &nstruction) i i ) ...—s install d ccordance withall governing ordinances of the City of Edmonds. ------- A .... ........... day of ----- Dated thi ­­1 .................................................. Chee i k BEFORE you dig for: Water [:], Gas F], Telephone' 0, Power Elp Sewer 0, Other E] -4 V APPLICATION The City of Edmonds for SIDE SEWER PERMIT EASEMENT NO - -------------------------------------------- NEW CONSTRUCTION REPAIRS LID NO . .................. ASMX. NO . .................. 7 ------------------------------ RLACn-q6lhiMIT NO - ---- -------------- 7-- TV OWNER --- --------- L—L-A .... Z - --------- ............................. CONTRACTOR . . ........... J ------- N:;;�' ..... . A JOB ADDRESS --- ....... -- ---------- LEGAL DESCRIPTION: LOT NO . ....... — ---------------------------- BLOCK NO . .................................... NAMEOF ADDITION ----------------------------------------------------------------------------------------------------------------------- pproved: , � -/Z - -& V. DATE .......... By --- 61� -Z// APPUCATION 0 The City of Edmonds for EASEMENT NO - ----------------------------- SIDE SEWER PERMrr --------------- NEW CONSTRUCTION [:] REPAIRS LID NO - ------------------ �ASMT. NO - ------------------ OWNER ....... 4�-U--f z ---------------------- ----------------------- CONTRACTOR :D -tr ------- C.Or PERMIT NO. JOB ADDRESS --mf Z-7 ------ - ------------------- LEGAL DESCRIPTION: LOT NO - -------- ----------------------------- BLOCK NO - ------------ ------------------------ ................................................................... --------- ------ .................................................... NAMEOF ADDITION --------------------------------------------------------- DATE-------------------------------------------- By --------------------------------------------------- Y,7fg Date— March 28, 1977 Memo to: Director ofMaintenande & Operation Public Works From: City Engineer Subject: Sewer Connection Charges ,Legal Description:, Lot,9, R. C. Munger Addition No., 3, as recorded in Volume 16V page 36 of Plats, Records of Snohomish�County, Washington. Commonly khown.as: Owner: 21730 95th Ave. W.- 4ilma Lutz Z.F.F. Calculation: 75 Z.F.F. X $�.50 $ 412.SO Connection Fee La teral X $ -0- Lateral Charge Unit x $25 25.00 Trunk Charge 10.00 Permit 447.50, TO�AL CC: owner 2108 My 25, 1966 (--9173D - 95th AVe�.V. V= Pear 11,1r. Cr4indall: Reference Is made to your request for a sunitalou study for Eot I Arboretum r3states 9,2* After careful consideration of the results of thepercolation and soil studies performed upon this lot it is our opiniou that this tract should be served by sanitary sewers for sewtole disposal rather than by the Septic VAak and druDifield -wethod. Cue to the tlgbt ifdpeyvious clzy stratu It IS impossible to obtain a satisfuctory percolution rate. In order to use the septic tank wethod we feel that it would be costly to excavate and buckfill with suitable material to create the required conditions. If YOu feel that you would still like to go aheud and construct a sultuble bed for a drainfleld we will be willing to assist you in eVrivir4i at the cost ilMlVed, Youn trulys Neyring Surveyors. Inc. NWJ/Vg REGARDING: 21730 95th Avenue West �06�6_2,P05- (address) R E C 0 R D 0 F C 0 N T A C T S DATE NAME, PHONE NO., & COMMENTS ADDRESS of CALLER 4/4/77 Wiln-a Lutz Certified Letter No. 406805 sent requiring hook-up by 7/1/77. 4/6/77 L. J. Roth obtained Permit #5748 and connection fee'of $4.12.50 paid. ACTION TAKEN Letter received. CONNE*CTION COMPLETED'APRIL*11.'1977 INITIALS JT JT N CITY of EDMONDS 200 Dayton Street - Edmonds, Washington 98020 - Telephone (206) 775-2525 Department of Public Works CERTIFIED MAIL 406966' Ms. Wilma Lutz 21730 95th Avenue West Edmonds, Washington 98020 Dear Ms. Lutz: April 4, 1977 Following a petition by a majority of the residents in your neigh- borhood, the City Council of Edmonds accepted ' the annexation in- corporating your property, lo ' cated at 21730 95th Avenue West, within the City limits. Officially, the annexation became effective November 6, 1976. The City has now transferred accounts from the Alderwood Water District to the Edmonds water system. Billing has been converted.to the Edmonds water rate and utility fee. The major motivation for annexing to the City was to obtain avail- ability for sewer hookups. Our -records indicate that your property abuts an existing sewer main and you are, therefore, required to* make connection. City Ordinance normally requires connection within 60 days. However, on annexation we allow for inclement weather con- ditions and additional time for the home owners to make necessary arrangements. We are establishing a date of July 1, 1977, as the time'in which you must have your residence connected to sewers. Requirements for obtaining a Side -Sewer Permit are as follows: 1. Payment of connection fee. Please bring the legal de ' scription of your property to the Public Works De- partment prior to your request for a Permit so that the connection fee can be computed. 2. Payment of $35 Permit fee. 3. Copies of all recorded easements (where applicable). 4. A plot -plan drawing of the proposed connection. Side -Sewer Permits may be obtained at the Public Works Department, 200 Dayton Street, Edmonds, between the hours of 8:00 a.m. and 5:00 p.m., Monday through Friday. Please phone Mr. John B. Mitchell, Water Sewer Superintendent, at 775-2525, extension 226, for any information or assistance you may desire. Yo s v t 'o L io 9rf LEIF LARSON, P.E. Direc of Public Works J BM: RHA: j t ac.0 040, .0,11) Oqjo 00s) 71viv 7vkoliv 03QIAOdd 3 ku3ml UO3 OV83AOO 33,VVVnION SNI 01V U LLL 67