Loading...
21813 86TH PL W.PDFIIIIIIIIIIII 8181 21813 86TH PL W City of Edmonds E ''n: 1:� STR T F I L E r� ""' ' I Site Classification Wor sheet JUN 16 2015) Page 1 of 2 OEVELv�,",'��W I SERVICES CTR. CITY OF EDWiONDS The i proJect's Site Classification will dictate the specific stormwater managernent requirements applicable to your site, Cornpleting this worksheet will help determine the arnount of regulated ill-lpel'ViOlIS Surface and whether your project falls into the cla8sification of a Small Site (Catevor I ()I- Calt-gory 2), or a Minor Site. Please reference the Glossa y — y --- r Jpp. 10- 11), Pi gurts Q ati d 1�dpp. 8-9), and Examples (pp. I 1- 12), toassist with completion ofthis worksheet. 1) Is Permeable Pavement' Proposed For Use on,this Site? El Yes EN No Refer to Stomi water Supplement Chapter 5. 1 it L' S, the subject area is to be considered impervious for initial site classification purposes. Include total permeable pavement area in the calculation of Non -Regulated, Replaced 'and/.or New impervious surface areas in the table below. 2) Determine the Amount and Type of Existing & Propos ed Impervious Surface for the Site Refer to Stonnwater Stipplement Chapter 2 and Fig. C Line 1: 1clenlily the Non -Regulated Impervious Surface Area. Line 2: Identify the Replaced Im ervious Surface Area, dividing tile total betweei� . Exempt and Regulated; either or both p may be zero. Note: For project classification purposes, Replaced Impervious,may only be considered exempt Linder certain conditions. Refer to the Glossary and Figure D. Line 3: Identify the New Impervious Surface Area for Your project. All imperviou . s areas created p0St-JLIIy 7, 1977 or after the date of annexation into the City are regulated & Should be included in this total unless they can be categorized separately as a Reiplaced-RegUlated area. Line 4: Enter the SLIM of the total Replaced -Regulated plus the total New impervious areas. Line 5: Identify the total area currently mitigated by an existing city -approved storm'Water management system. Line 6: Enter the sum of the value in Line 4 less the value in Line 5 to identify the total Regulated area in which stormwater controls have not yet been applied. Line 7:.Identify the total area prop osed to be mitigated through the use of Low Impact Development Techniques. f Ligg 8: Identify the total area proposed to be mitigated through conventional StormWater Management Techniques. Provide a copy of the:following table on the drainaLre Dlan sheet for the nrnnn.qprl nrnipet Line Type ype Area (square feet) Non-R.egulated egulate d .77777777 Exempt r ii��1 Regulated 3'71 C.: 2 Replaced )laced 77 3. 1 New (Post 1977) 4 4 4 4 4 'ost I � ) > Total Regulated Impervious A 4. rea Mitigation regidred ff in excess o 2000s "c + y - 5. Total Area Mitigated by Existing Storinwater Management S stem(s) 6. Regulated Area Not Yet Mitigated 3,710 0 7. Area Proposed to be Mitigated by Low Impact Development Techniques Area Proposed to be Mitigated through Conventional SWMTechniqtiesT=7]_ (e.g. porous asphalt, Porous concrete, paver blocks, concrete open celled PAvilig grids, or plastic lattices fil . Ned with turf or stone) Revised on 310512012 E72-SWM—Ei-osioll—Coitti-t)1-03.05.12.doc . : V , , Page 5 of 12 City of Edmonds Site Classification Worksheet Page 2 of 2 1 8CO 3) Determine the Total Area of Land DiOurbing Aclh,ity 8,000 sf Refer to Storinviater Supplenient Chapter 8 4) Determine the Quantity of Grading, Fill and/or Excavation 200 5) Will the project convert 3/4iAcre or More of Native Vegetation to Lawn or Landscaped Area? E:1 Yes FX] No 6) Identify the Watershed the'Existing Site Runoff Discharges to Re/er to Storinwater Suppl�nient Chapter 2.3 We' stgatb Pond -.Basin #5 Based on Site Location and Watershed Map — Figure-C. Check all that abply. A. E] Direct Discharge B. [X Creek or Lake Basin o.-Edmonds Way BMin • Puget Sound Basin • Puget Sound Piped Basin DETERMINE PROJECT CLASSIFICATION USING THE INFORMATION ABOVE AND THE PROJECT CLASSIFICATION CHART (Figure B, pg 4) mail Site - Category I S 1-1 Small Site - Category 2 El Minor Site Stornmater Supplement Storinwater Supplement Ston7livater Supplement Chapter 5 Chapter 5 Chapter 6 Revised on 310512012 E72-SWAI-Fi-osioll-Coiiti-ol-03.05.12.(Ioc k Page 6 of 12 PLANNING DATA SINGLE FAMILY RESIDENTIAL I,--- STREE Name: LA6 �f_ (1—P 00 5_� 01 0000 5-,o a Date: Site Address: -Z I / I Plan Check' # Project Description: Reduced Site Plan Provided:_k!,S_/NO) Zoning: Map Page: Corner Lot: (YES /QP Flag Lot: (YES re Critical Areas Determination # - in ==a- F Study Required IT 1�1-Waiver SEPA Determination: �9_Exempt El Needed (for over 500 cubic yards of grading) 0 Fee 0 Checklist El APO List with notarized form Required Setbacks Street: z Sid'. Side: Rear: Actual Setbacks Street: de- 0 Side: 0 Detached Structures: 11 Rockeries: 11 Fences/Trellises: EI-Bay Windows/ Projecting Modulation: edv'4'�f C/ Orr_ Stairs/Deck: ct �-(D (4o r-tl�cA(- A-- OA //9-0' c:�'z c)c Li,,�. c Height Datum Point: 41 Datum Elevation: Maximum Height -Allowed: (-7. Actual Height: Other Parking Required: Parking Provided: tz '61 C S�,_C/ Lot Area: C1 Maximum Lot Coverage: 35% Proposed: Z 7- Lot Coverage Calculations: Acl,.) e- tix-r— Z, T ADU Created: (YES / 00 Subdivision:SA- aw 4 olne- Legal Nonconforming Land Use Determination Issued: (YES Comments- A- 7 756Y. V Iq I or r- C, -Z I Plan Review By: � �/Jf 3 / -7 /1 -�_ Planning Data Form G4-11-06.doc !0 SEE D E T�11- B 8,257 SF C92 10' PRIVATE DR�WAGELE SEMENJ #2, fO BENEFIT LOTS 4� 5 & 6, SEE DE AIL D/ BUILDING HEIGHT CALCULATION A=92.18 B=92.14 C=93.21 D=91.31 368.84 + 4 = 92.21 AVE. ELEV. MAXIMUM HEIGHT = 92.21 + 25 =117.21 PROPOSED MAX. ELEVATION= 116.90 PROJECT 13ENCH MARK TOP OF CONCRETE MONUMENT IN CASING AT THE INTERSECTION OF 86th PLACE W. AND 218th STREET S.W. ELEVATION : 100.00 DATUM : ASSUMED LOT COVERAGE FOOTPRINT — 2,349 SQ FT COVERAGE 2 349+8,441 =27.83% li Scann&A, SCALE: 1"=20' 0 m 0' 5' 10' 20 7.5' BUILDING SETBACK LINE tRADE YARD TO DRAIN TO YARD DRA ISIS A, C) 0 -9 U) m I I Q 0 L) Z U) ENGINEERING DIVISION �OV D S NOTED 71,=Date:2J2i 15' BUILDING SETBACK LINE BUILDING SETBACK LINE N 89-32"13" W 64.52' U) one ('?s Z Corner a 0 M CZ 5.1tb ck �a .!��red 0 0 1 Front w cq �- 0 2 0 Sideslvl� Tld 7A i Y FN I Rear 9 m Other STREET FILE IMPERVIOUS AREAS SITE PLAN INFORMATION ROOF 2,763 SQ. FT. DRIVEWAY 726 SQ. FT. PROPERTY OWNER & CONTRACTOR: PATIO 132 SQ. FT. WALK 80 SQ. FT. ECHELBARGER INVESTMENTS, LLC STOOP 9 SO, FT, 4001 198TH STREET S.W. TOTAL 3,710 SQ. FT. LYNNWOOD, WA 98036 425-673-1100 REVISED MITIGATED 3,737 S.F. REGISTRATION NO. ECHELIL90506 IMPERVIOUS AREA SITE ADDRESS: 21813 86th-PLACE W. AREAS LOWER FLOOR 0 SQ. FT. EDMONDS, WA 98026 JUL 2 2015 MAIN FLOOR 1,495 SO. FT. LEGAL DESCRIPTION: UPPER FLOOR 1,745 SO. FT. )INC3 DEPAR;7MENT GARAGE 838 SO. FT. LOT 5, SHAW LANE SUILI .ONDS 0F Eog� COVERED PORCH 32 SQ. FT. CITY WALKWAY 80 SQ. FT. ASSESSOR'S PARCEL NUMBER: DRIVEWAY 726 SO. FT. PATIO/STOOP 141 SQ. FT. 01144700000500 LOVELL-SAUERLAND & ASSOCIATES, INC., 19217 36TH AVE. W., SUITE 106, LYNNWOOD, WA 98036 TELEPHONE: 425.775.1591 LSA FILE NO. 5383 DATE: 6-12-15 DRAWN: JTT REVISED PER CITY COMMENTS 7-22-15 JTT 6uD 2.015- 0-7(-4 & FILTER FABRIC - SECURED TO 2' X 2' 14 GA, WIRE FABRIC EQUAL 2' X 2' WOOD OR C I D EQUIVALENT �u 8'- 12' PLACE 3/4'-1.5' WASHED GRAVEL IN THE TRENCH AND ON BOTH SIDES OF FILTER FABRIC FENCE ON THE SURFACE. CU CONTRACTOR/DEVELOPER SHALL MAINTAIN AND REPLACE STRAW BALES TO INSURE PROPER EROSION CONTROL, laso-19ul-i FILTER FABRIC MATERIAL IN CONTINUOUS ROLLS. USE STAPLES OR WIRE RINGS TO ATTACH FABRIC TO WIRE, WIRE MESH SUPPORT F TO SUPPORT FILTER Fi BURY BOTTOM OF FILTER MATERIAL 8' TO 12' 6' MAX. 2' X 2' WOOD POSTS OR EQUIVALENT CITY INSPECTION REQUIRED ON ALL EROSION CONTROL METHODS BEFORE OTHER WORK CAN BEGIN.� CITY OF EDMONDS REVISIONS STANDARD DETAIL PROVED BY DATE FILTER FABRIC FENCE FILTRATION SYSTEMS DATE SCALE DWG NO. 7/24/01 1 NTS 11 E1.1 *'5�00- *THIS SITE DOES NOT CONTAIN SUFFICIENT AREA TO PROVIDE FULL LENGTH ENTRANCE. ±25' WILL BE PROVIDED FRON EDGE OF EXISTING ROADWAY TO FRONT OF NEW RESIDENCE MIN, RADIUS QUARRY SPALLS 2-4' MIN DIA 8'-12' MIN, DEPTH z -­-</ PROVIDE FULL WIDTH OF INGRESS/ EGRESS AREA CONTRACTOR SHALL MAINTAIN TEMPORARY CONSTRUCTION ENTRANCE DURING THE CONSTRUCTION PERIOD. ICITY INSPECTION REQUIRED ON ALL EROSION CONTROI MEASURES BEFORE WORK CAN BEGIN, la90-1199V L LITY O=IF:I- EDMONDS. REVISIQN�i_ STANDARD DETAIL APPROVED BY DATE D. GEBERT 10/6/03 STABILIZED CONSTRUCTION ENTRANCE DATE 7/24/01 1 SCALE NTS I DWG No' E 1 .2 SECTION 30, T.27N., RAE., W.M. ZEE UL I �ML b W, . . . . . . . . ........ ................. . . . ............ M WATER SEMENT TO LBARGER'S OA, ............................. ........ . . ...... . ... ....... 6 ... .... ... 8,257 SF 1J. 14 10' PRIVATE DRA!N�GE EASEMENT .#2 TO BENEFIT LOTS 4, 5 & 6 SEE DETAIL D� 9,976 SF ............ COM. BOX 10' PUBLIC UTILITY r 0 EASEMENT ............. 13 00-,' A - - - - - - - - - - - - - - - - - - - - 42.00' . ..... 0 . ........ 0 5 ............ . . 0 > 8,441 SF 50 MV -t 8.00' COM. BOx__j'[] - - - - - - - .0 - - - - - - - - - ............ 7 2. 00' 1 E DRAINAGE PLAN M2870B3FT I #1 TO JS 1. 2 &,3, q MF-93.10 00 1 2 00' (A CORERED 1 P CI_4 32 SF .............. 2 0 Ct .8,170 SF L4 2. 00' 2.. 0' 1.00, . ......... r2.00" 9.50 CIL N) 0 .. ....... 5'00' J� ............... L 0 19.50' I > - - - - - - - - .0 .. ... ...... ............ ISTOCKPILE)-- BMP#C1 23 PLASTIC . ... ........ COVERING AT STOCKPILES(TYP.) .... ........... ............. ALL DISTURBED AREAS ON AND OFF SITE SHALL BE COMPOST AMENDED TO MEET REQUIREMENTS OF BMP T5.13 IN THE STORMWATER MANUAL, ............ ........................ VOL V, CHAPTER 5 L 4 3 9,508 SF 9,871 SF CERTIFIED EROSION AND SEDIMENT .CONTROL LEAD (CESCL) CONTRACTOR SHALL PROVIDE A DOE CERTIFIED CESCL WHO SHALL BE AVAILABLE AT ALL TIMES. EROSION AND SEDIMENT CONTROL (ESC) NOTES 1. ESC MINIMUM REQUIREMENT - CONSTRUCT10N ACCESS ROUTE CONSTRUCTION VEHICLE: ACCESS SHALL BE, WHENEVER PRACTICAL, LIMITED TO ONE ROUTE. ACCESS POINTS SHALL BE STABILIZED NTH QUARRY SPALLS OR CRUSHED ROCK TO MINIMIZE THE TRACKING OF SEDIMENT ONTO PUBLIC ROADS. IF SEDIMENT IS TRANSPORTED ONTO A ROAD SURFACE, THE ROADS SHALL BE CLEANED THOROUGHLY ATTIE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM ROADS BY SHOVELING OR SWEEPING AND BE TRANSPORTED TO A CONTROLLED SEDIMENT DISPOSAL AREA WITHIN 24 HOURS. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. 2. ESC MINIMUM REQUIREMENT - STABILIZATION OF EXPOSED AREAS:ALL SOILS EXPOSED BY LAND DISTURBING ACTIVITIES SHALL BE STABILIZED BY SUITABLE APPLICA11ON OF BMPS, INCLUDING, BUT NOT LIMITED TO, SOD, HYDROSEEDING, OR OTHER VEGETATION, PLASTIC COVERING, OR MULCHING. ALL BMPS SHALL BE SELECTED, DESIGNED, AND MAINTAINED IN ACCORDANCE WITH THE MANUAL. THE EXPOSED SOILS SHALL BE STABILIZED ACCORDING TO AN APPROVED TIMETABLE. (TYPICALLY, NO SOILS SHALL REMAIN EXPOSED FOR MORE THAN TWO DAYS FROM OCTOBER 1 THROUGH APRIL 30 AND NO MORE THAN SEVEN DAYS FROM MAY 1 THROUGH SEPTEMBER 30). 3. ESC MINIMUM REQUIREMENT - PROTECTION OF ADJACENT PROPERTIES: ADJACENT PROPERTIES SHALL BE PROTECTED FROM SEDIMENT DEPOSITION BY APPROPRIATE USE OF VEGETAI�E BUFFER STRIPS, SEDIMENT BARRIERS OR FILTERS, DIKES OR MULCHING, OR BY A COMBINATION OF THESE MEASURES AND OTHER APPROPRIATE BMPS. 4. ESC MINIMUM REQUIREMENT - MAINTENANCE: ALL EROSION AND SEDIMENT CONTROL BMPS SHALL BE REGULARLY INSPECTED AND MAINTAINED BY THE OWNER TO ENSURE CON11NUED PERFORMANCE OF THEIR INTENDED FUNCTION. ALL MAINTENANCE AND REPAIR SHALL BE CONDUCTED IN ACCORDANCE WITH THE MANUAL. 5. ESC MINIMUM REQUIREMENT - OTHER BMPS: AS REQUIRED BY THE CITY, OTHER APPROPRIATE BMP'S TO MITIGATE THE EFFECTS INCREASED RUNOFF SHALL BE APPLIED. 6. ESC MINIMUM REQUIREMENT - UNDERGROUND UTILITY CONSTRUCTION: THE CONSTRUCT10N OF UNDERGROUND UTILITY LINES SHALL SPECIFICALLY ADDRESS THE FOLLOWING: A. EROSION CONTROL FOR EXCAVATED STOCKPILED MATERIALS; B. THE PLACEMENT OF EXCAVATED MATERIAL WHERE CONSISTENT WITH SAFETY AND SPACE CONSIDERATIONS SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES; C. TRENCH DEWATERING SYSTEMS (MUST DISCHARGE INTO SEDIMENT TRAPS, SEDIMENT PONDS, OR OTHER ACCEPTABLE MEANS); D. TRACKING AND SPILLING OF MATERIALS ON STREETS DUE TO HAULING; E. DAILY CLEANUP AND STREET MAINTENANCE. UTILITY CONFLICT NOTE THE LOCATION OF UNDERGROUND UTIL111ES SHOWN HEREON IS APPROXIMATE ONLY. THE OWNER SHOULD CONTACT THE PURVEYORS OF ALL UTILITIES IN THE AREA TO DETERMINE THE LOCATION AND DEPTH OF ALL UTILIT'IES ON AND ADJACENT TO THE PROPERTY. CONTRACTOR TO VERIFY UTILITY LOCATIONS PRIOR TO CONSTRUCTION. IF ANY CONFLICTS ARE IDEN11FIED CONTACT ENGINEER IMMEDIATELY. GRADE YARD TO DRAIN TO YARD DRAINS 0 7- 1[\j 0 -9 U) 0 0 U :4 Cq 0 1 VD U) 9) 0 V) 0 b 0 0 1C\1 0 V) U) 0 P u 'q 0 U 0 >_ VO hz U LEGEND t-y-Y-1� (9 CLEARING LIMITS X_ (5 FILTER FENCE (STD DETAIL E1.1) 17-1 A INLET PROTECTION (STD DETAIL E1.3) CONSTRUCTION ENTRANCE TO BE LOCATED AT NEW DRIVEWAY LOCA11ON-QUARRY SPALL ENTRANCE PER EDMONDS STANDARD DETAIL E 1.2 CONSTRUCTION SEQUENCE 1. SCHEDULE A PRE -CONSTRUCTION MEETING WITH CITY ENGINEERING DIVISION AT 425-771-0220 EXT.1326. TWO DAYS (48 HR.) N0110E IS REQUIRED. 2. REVIEW TEMPORARY EROSION AND SEDIMENT CONTROL NOTES. 3. CALL FOR UTILITY LOCATIONS. 4. INSTALL TESC MEASURES AND MAINTAIN DUST CONTROL WHILE PREVENTING DISTURBANCE OF ANY AREAS OF VEGETATION OUTSIDE THE CONSTRUCTION ZONE. 5. HAVE EROSION CONTROL MEASURES INSPECTED B Y CITY OF EDMONDS CITY ENGINEERING INSPECTOR. ALL TEMPORARY SEDIMENTATION AND EROSION CONTROL MEASURES MUST BE IN PLACE AND INSPECTED PRIOR TO ANY CONSTRUCTION OR SITE CLEARING. EROSION AND SEDIMENTATION CONTROL PRACTICES AND/OR DEVICES SHALL BE MAINTAINED UNTIL PERMANENT VEGETATION IS ESTABLISHED. 6. DEMOLISH EXISTING STRUCTURES. 7. ROUGH GRADE SITE AS REQUIRED TO INSTALL DRAINAGE FEATURES. 8. CLEAR, GRUB & ROUGH GRADE SITE. REVEGETATE DISTURBED AREAS NOT SUBJECT TO ADDITIONAL SURFACE DISTURBANCE IMMEDIATELY AFTER ROUGH GRADING. (OTHER EXPOSED AREAS SHALL BE STABILIZED PER EROSION CONTROL NOTES BELOW). 9. INSTALL UTILITIES AND OTHER SITE IMPROVEMENTS, INCLUDING FRONTAGE IMPROVEMENTS. 10. STABILIZE AND COMPOST AMEND ALL EXPOSED SOILS PRIOR TO REVEGETATION'OF EN11RE SITE. 11. ESTABLISH LANDSCAPING AND PERMANENT VEGETATION. ALL TEMPORARY EROSION CONTROL MEASURES SHALL BE REMOVED UPON FINAL SITE STABILIZATION AND APPROVAL BE CITY INSPECTOR. nx 4 4- TE CB FILTER SOCK WITH OVER FLOW HOLES CATCH BASIN THIS APPLICATION SHALL BE MAINTAINED AT ALL TIMES DURING CONSTRUCTION PERIOD, SEDIMENT SHALL BE REMOVED ON A REGULAR BASIS TO MAINTAIN FILTRATION EFFECTIVENESS. CITY INSPECTION REQUIRED ON ALL EROSION CONTROL] MEASURES BEFORE WORK CAN BEGIN. -0-F.- ....-E-OV N'D-S REVISIONS AeMyu Ay DATE STANDARD DETAIL D. GEBERT 10/06/03 D. GEBERT 05/19/05 TEMPORARY SEDIMENT TRAP FOR CATCH BASO lag 0_ 1 qC30 D, GEDERT 05/05/06 ' DATE 7/24/01 SCALE INTS DWG NO. E1.3 R. ENGLISH - 11/01/13 1 1 ESTIMATED GRADING QUANTITIES CUT 100 C.Y. FILL 100 C.Y. Call 2 Working Days Before You Dig 1-800-424-5555 Utilities Underground Location Center (ID,MT,ND,OR,WA) FILE JUL 2 3 20155 BUILDING DEPAR71VIV CITY OF EDMONDS APPROVED FOR CONSTRUCTION CITY OF EDMONDS DATE: A P )V 'D,�S NOT W Date: B Y.- CITY BUILDING DiPARTIMENT 19217 36th Avenue W. Suite 106 Lynnwood, WA 98036 phone: (425)775-1591 e-mail: info@Isaengineering.com web: Isaengineering.com C4 LU 13- z (n 2 5; Ca Ld Ld It < z _j ry 0 n CD n V) F--� n < ;7 3: C�3 0 CD ry z 0 6 Llj < L1J 1. ::) ry V) 0 0 0 0 ft 0 o z 0 Ld 0 C) Cf) LLJ L.Lj SCALE 1 $9 =20' DRAWN CHECKED SHEET J.T.T. DATE F.B. 6-12-15 527, P.54 C 1 PFN OF2 ISA FILE NO 5383 GENERAL NOTES 1. ALL MATERIALS AND WORK SHOWN ON THESE PLANS SHALL CONFORM TO THE CITY OF EDMONDS STANDARD PLANS AND DETAILS, THE FOLLOWING SPECIFICATIONS AND CODES, AND ALL OTHER APPLICABLE LOCAL MUNICIPAL, STATE, AND FEDERAL CODES, RULES AND REGULATIONS: - CURRENT INTERNATIONAL BUILDING CODE (IBC) - 2014 WSDOT/APWA STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION - WASHINGTON STATE DEPARTMENT OF ECOLOGY STORMWATER MANAGEMENT MANUAL FOR THE PUGET SOUND BASIN (CURRENT EDITION) 2. CONTRACTOR SHALL RECORD ALL APPROVED DEVIATIONS FROM THESE PLANS ON A SET OF "AS -BUILT" DRAWINGS AND SHALL SUMMARIZE ALL AS -BUILT CONDITIONS ON ONE SET OF REPRODUCIBLE DRAWINGS FOR SUBMITTAL TO THE OWNER PRIOR PROJECT COMPLETION AND ACCEPTANCE. A SET OF AS -BUILT DRAWINGS SHALL BE SUBMITTED TO THE CITY OF EDMONDS PRIOR TO FINAL APPROVAL OF THE BUILDING OCCUPANCY/FINAL PROJECT APPROVAL. 3. CONTRACTOR SHALL LOCATE AND PROTECT ALL UTILITIES DURING CONSTRUCTION AND SHALL CONTACT THE UNDERGROUND UTILITIES LOCATION SERVICE (1-800-424-5555) AT LEAST 48 HOURS PRIOR TO CONSTRUCTION. 4. CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AT THE PROJECT SITE BEFORE STARTING WORK AND SHALL NOTIFY OWNER'S REPRESENTATIVE OF ANY DISCREPANCIES. 5. CONTRACTOR SHALL OBTAIN A COPY OF THE GEOTECHNICAL REPORT (WHERE APPLICABLE) AND SHALL THOROUGHLY FAMILIARIZE HIMSELF WITH THE CONTENTS THEREOF. ALL SITE WORK SHALL BE PERFORMED IN STRICT COMPLIANCE WITH THE RECOMMENDATIONS OF THIS REPORT. 6. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS REQUIRED FOR INSTALLATION OF ALL SITE IMPROVEMENTS INDICATED ON THESE DRAWINGS. 7. ALL DISTURBED SOIL AREAS SHALL BE SEEDED OR STABILIZED BY OTHER ACCEPTABLE METHODS FOR THE PREVENTION OF ON -SITE EROSION AFTER THE COMPLETION OF CONSTRUCTION. SEE EROSION CONTROL PLANS FOR SPECIFIC GRADING AND EROSION CONTROL REQUIREMENTS. 8. THE CONTRACTOR SHALL KEEP OFF -SITE STREETS CLEAN AT ALL TIMES BY SWEEPING. WASHING OF THESE STREETS WILL NOT BE ALLOWED WITHOUT PRIOR APPROVAL. 9. CONTRACTOR SHALL BE RESPONSIBLE FOR AND SHALL INSTALL AND MAINTAIN SHORING AND BRACING AS NECESSARY TO PROTECT WORKERS, EXISTING BUILDINGS, STREETS, WALKWAYS, UTILITIES AND OTHER EXISTING AND PROPOSED IMPROVEMENTS AND EXCAVATIONS AGAINST LOSS OF GROUND OR CAVING EMBANKMENTS. CONTRACTOR SHALL ALSO 13E RESPONSIBLE FOR REMOVAL OF SHORING AND BRACING, AS REQUIRED. 10. CONTRACTOR SHALL OBTAIN APPROVAL FROM THE CITY AND FOLLOW CITY PROCEDURES FOR ALL WATER SERVICE INTERRUPTIONS, HYDRANT SHUTOFFS, STREET CLOSURES OR OTHER ACCESS RESTRICTIONS. CONTRACTOR SHALL NOT RELOCATE OR ELIMINATE ANY HYDRANTS WITHOUT FIRST OBTAINING WRITTEN APPROVAL FROM THE FIRE MARSHAL. DRAINAGE CONSTRUCTION NOTES 1. THE PROPERTY IS PART OF A THE PROPOSED PLAT OF SHAW LANE FOR WHICH A STORM WATER DETENTION SYSTEM HAS BEEN PROVIDED. THE ALLOWABLE IMPERVIOUS IS 3,737 SQ. FT. 2. THE FOOTING DRAINS WILL BE DIRECTED TO THE STUB PROVIDED IN THE PLAT DEVELOPMENT. 3. THE ROOF DRAINS SHALL BE DIRECTED TO THE STUB PROVIDED IN THE PLAT DEVELOPMENT. 4. PIPE MATERIAL: UNLESS CALLED OUT OTHERWISE ON THIS PLAN, ALL STORM DRAIN PIPE MATERIAL SHALL BE PER C.O.E. APPROVED MATERIALS LISTS MM-1, MM-2 & MM-3. NEW IMPERVIOUS AREAS ROOF 2,763 SQ. FT. DRIVEWAY 726 SQ. FT. PATIO 132 SQ. FT. WALK 80 SQ. FT. STOOP 9 SQ. FT. TOTAL 3,710 SQ. FT. TOTAL MITIGATED 3,737 S.F. IMPERVIOUS AREA ALLOWED FOR LOT 5 PER REVISED PLAT DRAINAGE PLAN STORMWATER CLASSIFICATION WORKSHEET INFORMATION: 1. PERMEABLE PAVEMENT PROPOSED = 0.0 SF 2. IMPERVIOUS AREA TABLE (SEE TABLE ON THIS SHEET) 3. TOTAL AREA OF LAND DISTURBING AC11\ATY=9,000±SF 4. EARTHWORK QUANTITY. EXCAVATION= 1 00±CY; FILL=100±CY 5. PROJECT WILL NOT CONVERT 3/4 AC OR MORE OF NATIVE VEGETATION TO LAWN OR LANDSCAPED AREA 6. WATERSHED=CREEK OR LAKE BASIN=WESTGATE POND 7. PROJECT CLASSIFICATION: CATEGORY 1 SMALL SITE IMPERVIOUS AREA TABLE TYPE AREA (SQUARE FEET) NON -REGULATED 0 EXEMPT REGULATED REPLACED 0 0 NEW (POST 1977) 1 + 3.710 TOTAL REGULATED IMPERVIOUS AREAJ 1 3.710 TOTAL AREA MITIGATED BY EXISTING STORMWATER MANAGEMENT SYSTEM(S) 3,710 REGULATED AREA NOT YET MITIGATED 0 AREA PROPOSED TO BE MITIGATED BY LOW IMPACT DEVELOPMENT TECHNIQUES 0 AREA PROPOSED TO BE MITIGATED THROUGH CONVENTIONAL SWM TECHNIQUES, 0 10' PRIVATE WATER --J EASEMENT #1 TO L BENEFIT LOTS 2 & 31 10'PRIVATE WATER EASEMENT #2 TO BENEFIT LOTS 4 & 5. ...... ........... A SEE DETAIL 8 TORM WATER ............... EASEMENT TO 'HELBARGER'S HOA, ............................. ........... . . . ..................................... ...................................... .. ....... .. ......................... ........................... .......... . .. .... 6 8,257 SF T. 10' PRIVATE DRANAGE EASEMEjRT #2 TO BENEFIT LOTS 4, 5 & 6, j .... ..... .. .. SEE DETAIL D' 9.9Z5 SF ............ UNDERGROUNDPOWER AND COMMUNICATIONS LINES COM. box OTING DR dN 0.0. 44'-1* PVC UNDERGROUND 10' PUBLIC P=90.48 %I-c4 n,) Ajrni�A WATER SERVICE, GAS SERVICE. UTILITY EASEMENT T A 42.00' I X SEWER (b INV=90.0 I V=85.93 0 5 C.0 _b -P V COM. Box - - - - - - - - - - - - - - - - `V=1 INV= VT .......... T� STUB 6.25j: ..A 2 6 -'0.26 U, OF I �2�16'-4*PVC ...SS 0 17.00% STOOP 9 SF 8.00' 8 00' FF 1 1 �0 .0 9,.;. 2.00' 1ATE DRAINAGE iz 1 oo' PLAN M2870133FT NT #1 TO LOTS 1, 2 &,,3, ROOF DR IN C.O. 0 MF=93.10 C� U I bt TOP=91. INV=86.'5 32 ___P clii' 2.00' CD I COVERED A .... .. . . .......... PO PORCH 32 SF I IL 2 0 8,170 SF 2.00' 1.00, 2. 0 ................ -2.00' "PIATIO 1 9.50' 1132 --SF 5.00' ................ 04 C� 19.50' 0 0 57 _4!PVCC'% . SD SID FOOTING DRAIN C.O. . . ... .. TING TOP=9(.38 .. . _f CO�NECT TO EXIS .......... .. FOOTING DRAIN LINE INV=87 28 (VERIFY) INV=87.6± (VERIFY) FOOTING DRAIN C.O. R06F DRAIN C TOP-90.86 0. TOP=90.31 INV=87.72 (VERIFY) 1 88.13 (VERIFY) NV= .......... . ..... ........ INV-88.88 GRADE YARD TO DRAIN TO YARD DRAINS INV=88.17 C7� cq 0 cq 0 0 U) Cq T U) 0 0 0 CZ 0 C11 0 Cq cq -9 Cz U) U 14 0 U) a PROJECT INFORMATION OWNER/ I APPLICANT ECHELBARGER INVESTMENTS, LLC 4001 198TH STREET' S.W. LYNNWOOD, WA 98036 425-673-1100 REGISTRA11ON NO. ECHELIL90506 ZONING RS-8 PARCEL NUMBER 01144700000500 PROPERTY AREA IUiAL LOT AREA - 8,441 SQ. FT PROPERTY ADDRESS 21813 86th PLACE W. LEGAL DESCRIPTION LOT 5, PLAT OF SHAW LANE ENGINEER /SURVEYOR CONTACT. JEFFREY TREIBER LOVELL-SAUERLAND & ASSOCIATES, INC. 19217-36TH AVENUE W. SUITE 106 LYNNWOOD, WA. 98036 PH.: 425-775-1591 E-MAIL: JEFFTOLSAENGINEERING.COM WATER SERVICE CITY OF EDMONDS TELEPHONE VERIZON ELECTRICITY P.U.D. NO. 1 OF SNOHOMISH COUNTY SANITARY SEWER SERVICE CITY OF EDMONDS NATURALGAS PUGETSOUND ENERGY 19217 36th Avenue W. Suite 106 Lynnwood, WA 98036 phone: (425)775-1591 e-mail: info@lsaengineering.com web: Isaengineering.com Cq IJj 5: Ld Ld Ld V) Ld Qf UTILITY CONFLICT NOTE THE LOCATION OF UNDERGROUND UTILITIES SHOWN HEREON IS APPROXIMATE ONLY. THE OWNER SHOULD CONTACT THE PURVEYORS OF ALL UTILITIES IN THE AREA TO DETERMINE THE LOCATION AND DEPTH < ry 0 OF ALL UTILITIES ON AND ADJACENT TO THE PROPERTY. CONTRACTOR TO VERIFY UTILITY LOCATIONS PRIOR TO CONSTRUCTION. IF ANY CONFLICTS ARE IDENTIFIED CONTACT ENGINEER IMMEDIATELY. n Lij U) Cn C) < BENCH MARK- �7 PROJECT BENCH MARK 0 TOP OF CONCRETE MONUMENT IN CASING AT THE INTERSECTION OF 86th PLACE W. AND 218th STREET S.W. ry :2 > ELEVATION : 100.00 r) �7 0 -.., DATUM ASSUMED FOOTING DRAIN8 NOT < LLJ 0 0 'TO TO BE TIED IN 0 DET000H 8Y.STEM Ljj 0 < 1 0 ACCEPTABLE TIffiTLM z: 0 U) :2 < MATERIAL 3DR 35 ry 0 SCH 40 r) N -12 7- 0 F810 HANCOR V) OWNER/CONTRACTOR RESPONSIBLE FOR LOCAnNG ALL ON -SITE UITIUTIES. R RE IS U 83 LLJ RELOCATIONIREVISION TO ANY UTILMES JUL 2 3 2015 41 V) MAY REQUIRE SEPARATE PERMIT BUILDING DEPAR71VIENT CITY OF EDMONDS Call 2 Working Days Before You Dig 1-800-424-5555 Utilities Underground Location Center (ID,MTND,0R,WA) APPROVED FOR CONSTRUCTION CITY OF EDMONDS SCAlz 1 $1 =20' DRAWN J.T.T. CHECKED J.T.T. I SHEET 1 DATE F.B. 6-12-15 , 527, P.54 C2 OF2 PFN. PLN20120043 LSA FM NO - 5383