Loading...
21815 86TH PL W.PDF111111111111 8183 21815 86TH PL W LLJ LL. I­ LIJ LAJ CO City of Edmonds Site Classification Worksheet Page 1 of 2 OV ED4f Z, n U 2 - 7 C. t gqz or The project's Site Classification will dictate the s ecific stormwater p managernent requirements applicable to your site. Completing this worksheet will help determine the amount of regulated impervious surface and whether your project falls into the classification of a Small Site (Category I or Category 2), or a Minor Site. Please reference the Glossary (pp. 10-11), Figures Q and E, (pp. 8-9), and Examples (pp. I I - 12), to assist with completion of this worksheet. 1) Is Permeable Pavement' Proposed For Use on this Site? Refer to Storinwater StIpPlement Chapter 5.1 El Yes [N No It YES, the subject area is to be considered impervious for initial site classification purposes. Include total permeable pavement area in' the calculation of Non -Regulated, Replaced'and/or New impervious surface areas in the table below. 2) Determine the Amount and Type of Existing & Proposed Impervious Surface for the Site Refer to Stonnivater Supplement Chapter 2-and Fig. C Line 1: 1dentify the Non -Regulated Impervious Surface Area. Line 2: Identify the Replaced Impervious Surface Area, dividing the total between Exempt and Regulated; either or both may be zero. Note: For project classification purposes, Replaced Impervious may only be considered exempt Linder certain conditions. Refer to the Glossary and Figure D. Line 3: Identify the New Impervious Surface Area for Your project. All impervious areas created post -July 7, 1977 or after the date of annexation into the City are regulated & should be included in this total unless they can be categorized separately as aReplaced-Regulated area. Line 4: Enter the sum of the total keplaced-Regulated plus the total New imperviou , s areas. Line 5: Identify the total area CUrr ' ently mitigated by an existing city -approved stormwater management system. Line 6: Enter the sum of the value in Line 4 less the value in Line 5 to identify the total Regulated area in which stormwater controls have riot yet been applied. Line 7: Identify the total area proposed to be mitigated through the use of Low Impact Development Techniques. Line 8: Identify the total area proposed to be mitigated through conventional StormN�ater Management Techniques. Provide a copy of the'following table on the drainage plan sheet for the Provosed proiect Line Type Area (square feet) 1. Non -Regulated Exempt Regulated 2.1 Replaced + ......... .... ­4:279. 3. 4. New (Post 1977) 44 4 4 4 Total Regulated Impervious Area Mitigation required if hi excess of 2000sf �4,279 - 5. 6. Total Area Mitigated by Existing Stormwater Management System(s) Regulated Area Not Yet Mitigated 4,279 0 I Area Proposed to be Mitigated by Low Impact Development Techniques T_ 8. Area Proposed to be Mitigated through Conventional SWM Techniques (e.g. porous asphalt, porous concrete, paver blocks, concrete open celled paving grids, or plastic lattices filled with turf or stone) Revised oiz 310512012 E72-SWM—Erosioii_Coliti-ol-O.?.05.12.doc Page 5 of 12 City of Edmonds of EDA. Site Classification Worksheet Page 2 of 2 3.) Determine the Total Area'of Land Disturbing Activity 8,000 sf Refer to Slon-nwoter Suppleinent iapter 8 4) Determine the Quantity of Grading, Fill and/or Excavation 200 —cy 5) Will the project convert 3/4 Acre or' More of Native Vegetation to Lawn or Landscaped Area? El Yes X No I I i - 141 6) Identify the Watershed the Existing Site Runoff Discharges to Refer to Storinwater Stipple I ment Chapter 2.3 Westgate Pond - Basin #5 Based on Site Location and Watershed Map — Figure-C. Check all th A. 0 Direct Discharge B. [Z Cre�k or Lake Basin • Edmonds Way Basin • Puget Sound Basin. ci Puget Sound Piped Basin DETERMINE PROJECT CLASSIFICATION USING THE INFORMATION ABOVE AND THE PROJECT CLASSIFICATION CHART �Figure B, pg 4) 0 Small Site - Category 1 0 Small Site - Category 2 El Minor Site Storinwater Supplement Stormwater Supplement Storinwater Supplement Chapter 5 Chapter 5 Chapter 6 UVI A Revised on 310512012 E72-SWM—Et-osioii—Coiitl-ol-03.05.12.doc Page 6 of 12 PLANNING DATA SINGLE FAMILY RESIDENTIAL STREET=FILE Name: T-9 - Date: SiteAddress: Plan Check #: Project Description: Reduced Site Plan Provided: CE NO) Zoning:. Map Page: Corner Lot: (YES 0 Flag Lot: (YES IDO Critical Areas Determination #:0. El Study Required C? O-Waiver SEPA De�ermination: ,VExempt El Needed (for over 500 cubic yards of grading) 0 Fee 0 Checklist 0 APO List with notarized form Required Setback5 Street, Side 7. Sid 7. Rear: ActualSetb�cks Street: Zq Side: 7- 7C) I Side: 5S-061 Rear: 11 Detached Structures: El Rockeries: El Fences/Trellises: B-Bay Windowis/Projecting Mod lation E�-Stairs/Deck: a 0 Hei ght Datum Point:( Ff-7/� OqVWJOK� 4 Datum Elevation: 0 0 Maximum Height Allowed: Z Actual Height: 16. Other Parking Required:- Parking Provided: Lot Area: 1, �-'() Maximum Lot Coverage: 35% Proposed: - y �� Lot Coverage Calculations: Aoc/ Lo rc-/q� ADU Created: (YES / NO) Subdivision: 6E S�A av, L cvte Legal Nonconforming Land Use Determination Issued: (YES ra Comments A QP G- C D 5-3 Plan Review By:/V6�qf �-O/\ Planning Data Fonn G4-11-06.doc N 89'30'44" r COM. BOX C� 00 7.5' BUILDING - SETBACK LINE L--- 203.10' -'23! NI 89'30 —' W (KROS) LANE 8,441- SF 10' PRIVATE DRAINAGE EASEMENT #3 TO B ENEFIT LOTS 4 & 5. N '89'30'23" W 90 APPROVED BY PLIAN&ING -13 If ENGINEERING DIVISLON P L A T T.E D -IlpiA P 0 ED S NOTED l Date:4=151 BUILDING HEIGHT CALCULATION IMPERVIOUS AREAS A=91.62 ROOF 2,867 SO. FT. B=91.76 DRIVEWAY 1,412 SO, FT C=92.99 D=91.53 TOTAL 4,279 SQ. FT. 367.90 + 4 = 91.97 AVE. ELEV. MAXIMUM HEIGHT = 91.97 + 25 =116.97 PROPOSED MAX. ELEVATION=116.,W 6-1 PROJECT BENCH MARK TOP OF CONCRETE MONUMENT IN CASING AT THE INTERSECTION OF 86th PLACE W. AND 218th STREET S.W. ELEVATION : 100.00 DATUM : ASSUMED LOT COVERAGE FOOTPRINT - 2,515 SQ FT COVERAGE 2,515+9,508 =26.45% MITIGATED PER REVISED CALCULATIONS 4,279 SQ. FT. AREAS LOWER FLOOR 0 SQ. FT. MAIN FLOOR 1,463 SQ. FT. UPPER FLOOR 1,774 SQ. FT. GARAGE 660 SO. FT. COVERED PORCH 207 SQ. FT. WALKWAY 0 SQ. FT. DRIVEWAY 1,271 SQ. FT. PATIO 110 SQ. FT. SCALE: 1"=20' &&0!61 0' 5' 10' 20' cNi LLI 1,10 0 0 14 7.5' BUILDING SETBACK LINE Altk N 0 -x 9 0 0 -9 n Cz U) 0 L u Zone_f�:�� Comer Flag Setbacks Reauired --Actual Front -140 -z- 5�, -Eq SidesOvJ 7-5-/7.!r -7. 5- [35, Or. Rear 5 1 5:� 2Z-ly 5&qther d _7, 1.10 " E�kht 2 zq-6� SITE PLAN INFORMATION PROPERTY OWNER & CONTRACTOR: ECHELBARGER INVESTMENTS, LLC 4001 198TH STREET S.W. LYNNWOOD, WA 98036 425-673-1100 REGISTRATION NO. ECHEUL90506 SITE ADDRESS: 21815 86th PLACE W. EDMONDS, WA 98026 F�C J�- LEGAL DESCRIPTION: LOT 4. SHAW LANE MAR 2 7 2C15 ASSESSOR'S PARCEL NUMBER: CII)YOVI-1 01144700000400 -P(,�f zol-ZOOC13 LOVELL-SAUERLAND & ASSOCIATES, INC., 19217 36TH AVE. W., SUITE 106, LYNNWOOD, WA 98036 TELEPHONE: 425.775.1591 LSA FILE NO. 5436 DATE: 3-26-15 DRAWN: J7 Scanned FILE avzoi 5-o,399 "RE SECTION 30, T.27N., R.4E., W.M. FILTER FABRIC - SECURED TO 2' X 2' 14 GA, WIRE FABRIC EQUAL 2' X 2' WOOD OR C I :) EQUIVALENT �xj 8'- 12' 81 PLACE 3/4'-1.5' WASHED GRAVEL IN THE TRENCH AND ON BOTH SIDES OF FILTER FABRIC FENCE ON THE SURFACE, C) cu CU CONTRACTOR/DEVELOPER SHALL MAINTAIN AND REPLACE STRAW BALES TO INSURE PROPER EROSION CONTROL. /U90-19qu FILTER FABRIC MATERIAL IN CONTINUOUS ROLLS. USE STAPLES OR WIRE RINGS TO ATTACH FABRIC TO WIRE. WIRE MESH SUPPORT F TO SUPPORT FILTER F BURY BOTTOM OF FILTER MATERIAL 8' TO 12' el KAAV 2' X 2' WOOD POSTS OR EQUIVALENT CITY INSPECTION REQUIRED ON ALL EROSION CONTROL METHODS BEFORE OTHER WORK CAN BEGIN, CITY OF EDMONDS REVISIONS STANDARD DETAIL PPZVED BY DATE FILTER FABRIC FENCE FILTRATION SYSTEMS DATE 7/24/01 1 SCALE NITS I DWG No' E1.1 MIN. RADIUS QUARRY SPALLS 2-4' MIN DIA 8'-12' MIN, DEPTH *THIS SITE DOES NOT CONTAIN SUFFICIENT AREA TO PROVIDE FULL kP LENGTH ENTRANCE. ±25' WILL BE PROVIDED FRON EDGE OF EXISTING ROADWAY TO FRONT OF NEW RESIDENCE PROVIDE FULL WIDTH OF INGRESS/ P OV E C SS GRESS AREA CONTRACTOR SHALL MAINTAIN TEMPORARY CONSTRUCTION ENTRANCE DURING THE CONSTRUCTION PERIOD. ICITY INSPECTION REQUIRED ON ALL EROSION CONTRO� MEASURES BEFORE WORK CAN BEGIN, IC90-199V CITY OF EDMONDS REVISIONS STANDARD DETAIL APPMVED BY DATE D. GEBERT 10/6/03 STABILIZED CONSTRUCTION ENTRANCE DATE 7/24/01 1 SCAM NTS I DWG No' E 1 .2 Si Cn Lq to W 0 0 z,0 �.IJ5 11 11 0 af Lo CE n 1 0 '9 1 _j .0 0) Lo _j - - - - - - - - - - - - 0 Eq 12 ICE '0 COV'D PORCH 207 SF Lo LD CL 5-5' 4.51 5.5' 2.17' ro LLJ to in 00 C5 6 2' THE CARLSON 11 ... ....... PLAN 3227 N MF=92 40'- .11 0 0 L z 1.00, 4 -0 9,508 SF 0 0 '0 - 2 12' 14.17 ____1 STOCKPILE) 116.33' �5 ��7.00' A3 O,� - - - - - - j BMP#C123 PLASTIC COVERED. COVERING AT PATIO STOCKPILES(TYP.) CL 311 9 x v cq X EN U) 0 QD PB C) 0 a, c) C\1 1__ o �_ ix g -9 R Cz U) 0 U) z 0 U ,q 13, 0 U U 0M a r\ 6 Indivi 06V (VI ij) (-0 cv-m6 -X- X 92.10' W01 7k- - - - - - - - - - - - 203.10' N'89-30'23" W -1-1r. N 89-3d"23 -W (M,ROS) 10' PRIVATE DRAINAGE EASEMENT TO BENEFIT ECHELBARGER'S SHAW LANE HOA. U N P L A T T Er D CERTIFIED EROSION AND SEDIMENT CONTROL LEAD (CESCL) CONTRACTOR SHALL PROVIDE A DOE CERTIFIED CESCL WHO SHALL BE AVAILABLE AT ALL TIMES. EROSION AND SEDIMENT CONTROL (ESC) NOTES 1. ESC MINIMUM REQUIREMENT - CONSTRUCTION ACCESS ROUTE CONSTRUCTION WHICLE: ACCESS SHALL BE, WHENEVER PRACTICAL, LIMITED TO ONE ROUTE. ACCESS POINTS SHALL BE..STABILIZED NTH QUARRY SPALLS OR CRUSHED ROCK TO MINIMIZE THE TRACKING OF SEDIMENT ONTO PUBLIC ROADS, IF SEDIMENT IS TRANSPORTED ONTO A ROAD SURFACE, THE ROADS SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM ROADS BY SHOVELING OR SWEEPING AND BE TRANSDORTED TO A CONTROLLED SEDIMENT DISPOSAL AREA WITHIN 24 HOURS. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. 2. ESC MINIMUM REQUIREMENT - STABILIZATION OF EXPOSED AREAS:ALL SOILS EXPOSED BY LAND DISTURBING ACTIVIT'IES SHALL BE STABILIZED BY SUITABLE APPLICATION OF BMPS, INCLUDING, BUT NOT LIMITED TO, SOD, HYDROSEEDING, OR OTHER VEGETATION, PLASTIC COVERING, OR MULCHING. ALL BMPS SHALL BE SELECTED, DESIGNED, AND MAINTAINED IN ACCORDANCE WITH THE MANUAL. THE EXPOSED SOILS SHALL BE STABILIZED ACCORDING TO AN APPROVED TIMETABLE. (TYPICALLY, NO SOILS SHALL REMAIN EXPOSED FOR MORE THAN TWO DAYS FROM OCTOBER 1 THROUGH APRIL 30 AND NO MORE THAN SEVEN DAYS FROM MAY 1 THROUGH SEPTEMBER 30). 3. ESC MINIMUM REQUIREMENT - PROTEC11ON OF ADJACENT PROPERTIES: ADJACENT PROPERTIES SHALL BE PROTECTED FROM SEDIMENT DEPOS11ION BY APPROPRIATE USE OF VEGETATIVE BUFFER STRIPS, SEDIMENT BARRIERS OR FILTERS, DIKES OR MULCHING, OR BY A COMBINATION OF THESE MEASURES AND OTHER APPROPRIATE BMPS. 4. ESC MINIMUM REQUIREMENT - MAINTENANCE: ALL EROSION AND SEDIMENT CCNITROL BMPS SHALL BE REGULARLY INSPECTED AND MAINTAINED BY THE OWNER TO ENSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. ALL MAINTENANCE AND REPAIR SHALL BE CONDUCTED IN ACCORDANCE WITH THE MANUAL. 5. ESC MINIMUM REQUIREMENT - OTHER BMPS: AS REQUIRED BY THE CITY, OTHER APPROPRIATE BMP'S TO MITIGATE THE EFFECTS INCREASED RUNOFF SHALL BE APPLIED. 6. ESC MINIMUM REQUIREMENT - UNDERGROUND UTILITY CONSTRUCTION: THE CONSTRUCTION OF UNDERGROUND UTILITY LINES SHALL SPECIFICALLY ADDRESS THE FOLLOWING: A. EROSION CONTROL FOR EXCAVATED STOCKPILED MATERIALS; B. THE PLACEMENT OF EXCAVATED MATERIAL WHERE CONSISTENT WITH SAFETY AND SPACE CONSIDERA11ONS SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES; C. TRENCH DEWATERING SYSTEMS (MUST DISCHARGE INTO SEDIMENT TRAPS, SEDIMENT PONDS, OR OTHER ACCEPTABLE MEANS); D. TRACKING AND SPILLING OF MATERIALS ON STREETS DUE TO HAULING; E. DAILY CLEANUP AND STREET MAINTENANCE. UTILITY CONFLICT NOTE THE LOCATION OF UNDERGROUND UTILITIES SHOWN HEREON IS APPROXIMATE ONLY. THE OWNER SHOULD CONTACT THE PURVEYORS OF ALL UTILITIES IN THE AREA TO DETERMINE THE LOCATION AND DEPTH OF ALL UTILITIES ON AND ADJACENT TO THE PROPERTY. CONTRACTOR TO VERIFY UTILITY LOCATIONS PRIOR TO CONSTRUCTION. IF ANY CONFLICTS ARE IDEN11FIED CONTACT ENGINEER IMMEDIATELY. ALL UP0,­ci covi ii�n, LEGEND CLEARING LIMITS _X­ FILTER FENCE (STD DETAIL E1.1) & INLET PROTECTION (STD DETAIL E1.3) CONSTRUCTION ENTRANCE TO BE LOCATED AT NEW DRIVEWAY LOCATION -QUARRY SPALL ENTRANCE PER EDMONDS STANDARD DETAIL E 1.2 CONSTRUCTION SEQUENCE 1. SCHEDULE A PRE -CONSTRUCTION MEETING NTH CITY ENGINEERING DIVISION AT 425-771-0220 EXT.1326. TWO DAYS (48 HR.) NOTICE IS REQUIRED. 2. REVIEW TEMPORARY EROSION AND SEDIMENT CONTROL NOTES. 3. CALL FOR UTILITY LOCATIONS. 4. INSTALL TESC MEASURES AND MAINTAIN DUST CONTROL WHILE PREVENTING DISTURBANCE OF ANY AREAS OF VEGETATION OUTSIDE THE CONSTRUCTION ZONE. 5. HAVE EROSION CONTROL MEASURES INSPECTED BY CITY OF EDMONDS CITY ENGINEERING INSPECTOR. ALL' TEMPORARY SEDIMENTATION AND EROSION CONTROL MEASURES MUST BE IN PLACE AND INSPECTED PRIOR TO ANY CONSTRUCTION OR SITE CLEARING. EROSION AND SEDIMENTATION CONTROL PRAC110ES AND/OR DEVICES SHALL BE MAINTAINED UN11L PERMANENT VEGETATION IS ESTABLISHED. 6. DEMOLISH EXISTING STRUCTURES. 7. ROUGH GRADE SITE AS REQUIRED TO INSTALL DRAINAGE FEATURES. 8. CLEAR, GRUB & ROUGH GRADE SITE. REVEGETATE DISTURBED AREAS NOT SUBJECT TO ADD11IONAL SURFACE DISTURBANCE IMMEDIATELY AFTER ROUGH GRADING. (OTHER EXPOSED AREAS SHALL BE STABILIZED PER EROSION CONTROL NOTES BELOW). 9. INSTALL U11LITIES AND OTHER SITE IMPROVEMENTS, INCLUDING FRONTAGE IMPROVEMENTS. 10. STABILIZE AND COMPOST AMEND ALL EXPOSED SOILS PRIOR TO REVEGETATION OF EN11RE SITE. 11. ESTABLISH LANDSCAPING AND PERMANENT VEGETATION. ALL TEMPORARY EROSION CONTROL MEASURES SHALL BE REMOVED UPON FINAL SITE STABILIZA11ON AND APPROVAL BE CITY INSPECTOR. :A- 4 A 4- CD FILTER SOCK WITH OVER FLOW HOLES 19:4 I CATCH BASIN I THIS APPLICATION SHALL BE: MAINTAINED AT ALL TIMES DURING CONSTRUCTION PERIOD, SEDIMENT SHALL BE REMOVED ON A REGULAR BASIS TO MAINTAIN FILTRATION EFFECTIVENESS. CITY INSPECTION REQUIRED ON ALL EROSION CONTROLI MEASURES BEFORE WORK CAN BEGIN. REVISIONS STANDARD DETAIL AM-KIVED BY - -DATE 1). GE13ERT 10/06/03 TEMPORARY SEDIMENT TOP FOR CATCH BASINS 1). GEBERT 05/19/05 D. GEBERT 05/05/06 DATE SCALE WG N In 1890-1990 R. ENGLISH 11/01/13 1 7/24/01 1 NTS 1 0- E1.3 ENGINEERING DIVISION APP' V D A NOTED Date: L ESTIMATED GRADING QUANTITIES CUT = 100 C.Y. FILL - 100 C.Y. 2 hL STREET FILE Call 2 Working Days Before You Dig 1-800-424-5555 Utilities Underground Location Center (ID,MT,ND,0R,WA) APPROVED FOR CONSTRUCTION CITY OF EDMONDS DATE: BY. CITY BUILDING DEPARTMENT 19217 36th Avenue W. Suite 106 Lynnwood, WA 98036 phone: (425)775-1591 e-mail: info@lsaengineering.com web: Isaengineering.com M z < n� 0 n I­ 0 n n C� 7- Cn I-- U) n < Co 7, 3: C�3 L -0 0 0 P0 .2 r) 0 d LLJ < Lij I , D 11� U) 0 0 C) 0 0 1-- & co < LLJ 0 _j 0 Lli U) z SCALE 1 of =20' DRAWN CHECKED SHEET J.T.T. DATE F.B. C1 3-26-15 527, P.54 PFN OF2 LSA MILE NO' 5383 L 16L,D-2_015- 03qq GENERAL NOTES 1. ALL MATERIALS AND WORK SHOWN ON THESE PLANS SHALL CONFORM TO THE CITY OF EDMONDS STANDARD PLANS AND DETAILS, THE FOLLOWING SPECIFICATIONS AND CODES, AND ALL OTHER APPLICABLE LOCAL MUNICIPAL, STATE, AND FEDERAL CODES, RULES AND REGULA11ONS: - CURRENT INTERNATIONAL BUILDING CODE (IBC) - 2014 WSDOT/APWA STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUC11ON - WASHINGTON STATE DEPARTMENT OF ECOLOGY STORMWATER MANAGEMENT MANUAL FOR THE PUGET SOUND BASIN (CURRENT EDITION) 2. CONTRACTOR SHALL RECORD ALL APPROVED DEVIA11ONS FROM THESE PLANS ON A SET OF "AS -BUILT" DRAWINGS AND SHALL SUMMARIZE ALL AS -BUILT CONDITIONS ON ONE SET OF REPRODUCIBLE DRAWINGS FOR SUBMITTAL TO THE OWNER PRIOR PROJECT COMPLETION AND ACCEPTANCE. A SET OF AS -BUILT DRAWINGS SHALL BE SUBMITTED TO THE CITY OF EDMONDS PRIOR TO FINAL APPROVAL OF THE BUILDING OCCUPANCY/FINAL PROJECT APPROVAL. 3. CONTRACTOR SHALL LOCATE AND PROTECT ALL U11LI11ES DURING CONSTRUCTION AND SHALL CONTACT THE UNDERGROUND U11LITIES LOCATION SERVICE (1-800-424-5555) AT LEAST 48 HOURS PRIOR TO CONSTRUCTION. 4. CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AT THE PROJECT SITE BEFORE STARTING WORK AND SHALL NOTIFY OWNER'S REPRESENTATIVE OF ANY DISCREPANCIES. 5. CONTRACTOR SHALL OBTAIN A COPY OF THE GEOTECHNICAL REPORT (WHERE APPLICABLE) AND SHALL THOROUGHLY FAMILIARIZE HIMSELF WITH THE CONTENTS THEREOF. ALL SITE WORK SHALL BE PERFORMED IN STRICT COMPLIANCE WITH THE RECOMMENDATIONS OF THIS REPORT. 6. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS REQUIRED FOR INSTALLATION OF ALL SITE IMPROVEMENTS INDICATED ON THESE DRAWINGS. 7. ALL DISTURBED SOIL AREAS SHALL BE SEEDED OR STABILIZED BY OTHER ACCEPTABLE METHODS FOR THE PREVENTION OF ON -SITE EROSION AFTER THE COMPLETION OF CONSTRUCTION. SEE EROSION CONTROL PLANS FOR SPECIFIC GRADING AND EROSION CONTROL REQUIREMENTS. 8. THE CONTRACTOR SHALL KEEP OFF -SITE STREETS CLEAN AT ALL TIMES BY SWEEPING. WASHING OF THESE STREETS WILL NOT BE ALLOWED WITHOUT PRIOR APPROVAL. 9. CONTRACTOR SHALL BE RESPONSIBLE FOR AND SHALL INSTALL AND MAINTAIN SHORING AND BRACING AS NECESSARY TO PROTECT WORKERS, EXISTING BUILDINGS, STREETS, WALKWAYS, UTILITIES AND OTHER EXISTING AND PROPOSED IMPROVEMENTS AND EXCAVATIONS AGAINST LOSS OF GROUND OR CAVING EMBANKMENTS. CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR REMOVAL OF SHORING AND BRACING, AS REQUIRED. 10. CONTRACTOR SHALL OBTAIN APPROVAL FROM THE CITY AND FOLLOW CITY PROCEDURES FOR ALL WATER SERVICE INTERRUPTIONS, HYDRANT SHUTOFFS, STREET CLOSURES OR OTHER ACCESS RESTRICTIONS. CONTRACTOR SHALL NOT RELOCATE OR ELIMINATE ANY HYDRANTS WITHOUT FIRST OBTAINING WRITTEN APPROVAL FROM THE FIRE MARSHAL. DRAINAGE CONSTRUCTION NOTES 1. THE PROPERTY IS PART OF A THE PROPOSED PLAT OF SHAW LANE FOR WHICH A STORM WATER DETENTION SYSTEM HAS BEEN PROVIDED. THE ALLOWABLE IMPERVIOUS IS AS SHOWN ON THE REVISED CALCULA11ONS SUBMITTED HEREWITH. 2. THE FOOTING DRAINS WILL BE DIRECTED TO THE STUB PROVIDED IN THE PLAT DEVELOPMENT. 3. THE ROOF DRAINS SHALL BE DIRECTED TO THE STUB PROVIDED IN THE PLAT DEVELOPMENT. 4. PIPE MATERIAL: UNLESS CALLED OUT OTHERWISE ON THIS PLAN, ALL STORM DRAIN PIPE MATERIAL SHALL BE PER C.O.E. APPROVED MATERIALS LISTS MM-1, MM-2 & MM-3. NEW IMPERVIOUS AREAS ROOF 2,867 SQ. FT. DRIVEWAY 1,412 SQ. FT, TOTAL 4,279 SQ. FT. MITIGATED PER REVISED CALCULATIONS 4,279 SQ. FT. STORMWATER CLASSIFICATION WORKSHEET INFORMATION: 1. PERMEABLE PAVEMENT PROPOSED = 0.0 SF 2. IMPERVIOUS AREA TABLE (SEE TABLE ON THIS SHEET) 3. TOTAL AREA OF LAND DISTURBING AC11\ATY=9,000±SF 4. EARTHWORK QUANTITY. EXCAVATION=100±CY, FILL=100±CY 5. PROJECT WILL NOT CONVERT 3/4 AC OR MORE OF NATIVE VEGETATION TO LAWN OR LANDSCAPED AREA 6. WATERSHED=CREEK OR LAKE BASIN=WESTGATE POND 7. PROJECT CLASSIFICATION: CATEGORY 1 SMALL SITE IMPERVIOUS AREA TABLE TYPE AREA (SQUARE FEET) NON -REGULATED 0 Z EXEMPT REGULATED REPLACED 0 0 NEW (POST 1977) + 4,279 TOTAL REGULATED IMPERVIOUS AREA 4,279 TOTAL AREA MITIGATED BY EXISTING STORMWATER MANAGEMENT SYSTEM(S) 4,279 REGULATED AREA NOT YET MITIGATED 0 AREA PROPOSED TO BE MITIGATED BY LOW IMPACT DEVELOPMENT TECHNIQUES 0 AREA PROPOSED TO BE MITIGATED THROUGH CONVENTIONAL SWM TECHNIQUES, iwpv - - - - - - - - - - - - - - - - - - A ............ ............... . ................. .............. 5 RIVATE DRAINAGE 4F�NT #1 TO -IT'LOTS 1, 2 & 8,W1 SF ........... .8,170 SF co - - - - - - - - - - - - -- 0 10' PRIVATE DRAINAGE z EASEMENT #3 TO BENEFIT LOTS 4 & 5, ....... .... d "Six ........... -b # ............. ............ do cq .......... 18.22±­� INV=E 0 YD 59'-4"PVC61 42% G so SD TOP=91.3 U) ....... . ..................... INV=89.0 . .. .... ........... 0 22.00' 1 =W104± 0 INV=87.Z2 1 0 AV=88.45± - . " 1 4 0 C� I 0) Cz 4 0 0 A" 011L aac� 5k(& . . . ... ................ . ................... 0 ... . ..... .................. ? . C6N--. DRIVE ............ ....... .......... .......... ........... O�UC�Wo\,kf cq 0 z_ ............... 1,412 0 9 0 PV U) C 02.22% COV'D PDRCH 207 SF OM. BOX - LO U) 29 z to II F- 5' 0 4 2.17' to I NT8 .2- d U 3 00 L -�a 9,871 SF 2' THE CARLSON 11 If to W PLAN 3227 1. 0 49'-l" PVC ...... U MF=92. WATER SER\ACE -1.33 0 L n 1.00, 4 9,508 SF U -0 14.17' 0 7.00' �1 6.33' c� - -9 F-W 4=90.7 115'-4"PN'C01% COVERLU. INV=89.6 :PATIO 11 ...... ....... ... 0 0 ...... .... 203.10' - - - - - - - - - N 89'3d'23'.-W� (M,ROS) 10' PRIVATE DRAINAGE EASEMENT TO BENEFIT ECHELBARGER'S SHAW LANE HOA. Sy yw Ava 1 1 V15S Vft V u amacw if)4,ko *C)�c "IV-) 41 co y\0 jr : 54� sy4m PROJECT INFORMATION OWNERAPPLICANT ECHELBARGER INVESTMENTS, LLC 4001 198TH STREET S.W. LYNNWOOD, WA 98036 425-673-1100 REGISTRATION NO. ECHELIL90506 ZONING_ RS-8 PARCEL NUMBER 01144700000400 PROPERTY AREA TOTAL LOT AREA - 9,508 SQ. FT. PROPERTY ADDRESS 21815 86th PLACE W. LEGAL DESCRIPTION LOT 4, SHAW LANE UTILITY CONFLICT NOTE ENGINEER /SURVEYOR CONTACT. JEFFREY TREIBER LOVELL- SAU ERLAN D & ASSOCIATES, INC. 19217-36TH AVENUE W. SUITE 106 LYNNWOOD, WA. 98036 PH.: 425-775-1591 E-MAIL: JEFFTCLSAENGINEERING.COM WATER SERVICE CITY OF EDMONDS TELEPHONE VERIZON ELECTRICITY P.U.D. NO. 1 OF SNOHOMISH COUNTY SANITARY SEWER SERVICE CITY OF EDMONDS NATURAL GAS PUGET SOUND ENERGY FHE LOCATION OF UNDERGROUND UTILITIES SHOWN HEREON IS APPROXIMATE ONLY. THE OWNER SHOULD CONTACT THE PURVEYORS OF ALL U11LIlIES IN THE AREA TO DETERMINE THE LOCATION AND DEPTH OF ALL UTILITIES ON AND ADJACENT TO THE PROPERTY. CONTRACTOR TO VERIFY UTILITY LOCATIONS PRIOR TO CONSTRUCTION. IF ANY CONFLICTS ARE IDENTIFIED CONTACT ENGINEER IMMEDIATELY. -jk BENCH MARK_ PROJECT BENCH MARK TOP OF CONCRETE MONUMENT IN CASING AT THE INTERSEC11ON OF 86th PLACE W. AND 218th STREET S.W. ELEVATION : 100.00 DATUM : ASSUMED Call 2 Working Days Before You Dig 1-800-424-5555 Utilities Underground Location Center (ID,MT,ND,OR,WA) ENGINEERING DIVISION A OV D NOTEP. Date: 27 j". �'J 5 APPROVED FOR CONSTRUCTION CITY OF EDMONDS DATE, BY - CITY BUILDING DEPAR'nAENT 19217 36th Avenue W. Suite 106 Lynnwood, WA 98036 phone: (425)775-1591 e-mail: info@lsaengineering.com web: lsaengineering.com U2 z Lij ry 0 < I-- 0 V) < 0 0 n 1171.1 0 LLJ �7 1 1 '--. LJJ I I D < M 0 0 Lij LL- CD < 0 71 q- 0 C/) :2 < 0 QQ 0 . 1i z C/5 Z (J V) z SCALE 1 it =20' DRAWN CHECKED SHEET J.T.T. J.T.T. DATE F.B. 3-26-15 , 527, P.54 C2 PFN. PLN20120043 OF2 LSA FILE NO - 5493