Loading...
21909 96TH AVE W.PDFiiiiiiiiiiii 9438 21909 96TH AVE W *CEN-TERL I N E SOLUTIONS RF Safety and NIER Analysis Report 7/27/2015 Site: SE01575A Prepared for: T-Mobile SEP 112015 DEVELOPMENT SERVICES COUNTER v N I = TIA �, Prepared for: T-Mobile, Site: SE01575A Table of Contents Certification.................................................................................................................... 3 Executive Summary ........................................................................................................ 4 Introduction..................................................................................................................... 6 SiteDetails ...................................................................................................................... 6 Predictive Analysis Details ............................................................................................... 8 Conclusions and Recommendations ............................................................................... I I Appendix A: FCC Compliance and RF Safety Policies .................................................. 12 Appendix B: Overview of RoofView@ Functions and Assumptions .............................. 14 References..................................................................................................................... 16 LimitedWarranty ........................................................................................................... 16 Centerline Solutions, Inc. Proprietary and Confidential Page 2 of 16 Prepared for: T-Mobile, Site: SEO I 575A Certification This report, prepared by Centerline Solutions, LCC for T-Mobile, is intended to document compliance and evaluate power density levels as outlined in the report. The comput ' ations,'analysis, and resulting report and conclusions were based on applicable FCC guidelines and regulations for maximum permissible exposure to humans consistent with FCC OET Bulletin 65, Edition 97-01. Additionally, Centerline Solutions, LCC certifies that the assumptions are valid and that the data used within Centerline Solutions' control are accurate, including information collected as part of Centerline Solutions' field surveys. Centerline Solutions, LCC does not however certify the accuracy or correctness of any data provided to Centerline Solutions, LCC for this analysis and report by T-Mobile or other third parties working on behalf of T-Mobile. I certify that the attached RF environmental analysis and report is correct to the best of my knowledge, and all calculations, assumptions and conclusions are based on generally acceptable engineering practices: John C. Keating, P.E. July 27 1h 2015 Centerline Solutions, Inc. Proprietary and Confidential Page 3 of 16 Prepared for: T-Mobile, Site: SE01575A Executive Summary This report provides the results of an RF power density analysis performed on T- Mobile's utility pole site SE01 575A. Current Site Confizuration: The Site's current configuration is as follows: Three sector site operating with technology including GSM in PCS band (1900 MHz), UNITS in PCS band (1900 MHz), and UMTS* in AWS band (2 100 MHz). Proposed Site Configuration: The Site's proposed upgrade is as follows: Installation and operation of additional LTE technology, Long Term Evolution (LTE) in the 700 and 2100 MHz bands. UNITS in the AWS band (2100 MHz band) will be removed. The proposed physical modifications will result in replacement of radio hardware and antennas at this site. Site Description: Site Type and Height- Utility Pole, elevation of 93. V Equipment Location- Adjacent to the utility pole, inside a shelter. Other Antennas- This is a T_-Mobile only site that does not host 'any other antennas. Access- Access to the utility pole is open to the general public, the equipment is inside a locked shelter. Study Reference Location- This study examines the power density environment at ground and rooftop level from ALL sources of RF. - Existing Signage- There is blue RF signage at the base of the utility pole. RF Environment- Since the area on the ground and the adjacent rooftops is open to general public, for purposes of evaluating compliance with FCC OET Bulletin 65, the area is determined as a General Public environment., AnalyaLis: The analysis of the RF power density at this site indicates that emissions on the rooftop of adjacent buildings will not exceed the FCC's Maximum Permissible Exposure (MPE) limit for general/public environments. Ground level exposure is calculated to be less than 5% of the FCC MPE limit for general public environments. No further mitigation is required. Centerline Solutions, Inc. Proprietary and Confidential Page 4 of 16 Prepared for: T-Mobile, Site: SE01575A Conclusion and Recommendations: 0 The results of the analysis indicate that the power density levels at ground and rooftop of the, nearby buildings will not exceed FCC MPE limit with the proposed antenna plan. - The risk of accidental exposure from these antennas is being mitigated by an RF alert sign placed at the base of the utility pole which is visible upon approaching to it. - This site will be operating in general compliance with FCC OET Bulletin 65 following the implementation of the changes outlined in this report. No further mitigation is required. Centerline Solutions, Inc. Proprietary and Confidential Page 5 of 16 Prepared for: T-Mobile, Site: SE01575A Introduction The purpose of this analysis and report is to evaluate the cumulative power density levels of all antennas located on the utility pole and identify any areas of concern that require mitigation. This report also assesses the site's compliance with FCC OET Bulletin 65; "Guidelines for Human Exposure to Radio -frequency Electromagnetic Fields". As part of this analysis, the site was visited on 3/23/2015, to perform a complete field survey. The purpose of the survey was to verify antennas located on the utility pole and identify co -located wireless facilities. The power density simulation performed for this site utilized Roofviewo analysis software. All antennas were assigned an operating frequency and transmit power and were deemed to be operating at 100% of their rated output power. Site Details Address: 2190996 1h Ave W Seattle, WA 98020 Site type: Utility Pole Height: — 93. V The photographs on the following pages show a view of the existing antennas on the utility pole and RF signage that is present. Centerline Solutions, Inc. Proprietary and Confidential Page 6 of 16 Prepared for: T-Mobile, Site: SEO I 575A Exhibit I- Photos Centerline Solutions, Inc. Proprietary and Confidential Page 7 of 16 Prepared for: T-Mobile, Site: SEO I 575A Antenna Invento!y. The following table contains the technical data used to simulate the power density that may be encountered with all antennas simultaneously operating at full rated power. TMAIA G1900 1950 40 2 0.5 71.30007505 Commkope SBNHH-ID65A TMAIS U1900 1950 30 2 0.5 53.47505629 CommScape SBNHH-1065A TMAIC L2100 2150 120 1 0.5 106.9501126 CommScope S8NHH-ID65A TMAID L700 730 60 1 0.5 53.47505629 Commkope SBNHH-ID65A TM82A G1900 1950 40 2 0.5 71.30007505 CommScope SBNHH-ID65A TM828 U1900 19SO 30 2 O.S 53.47505629 Commkope SBNHH-ID6SA TMI32C L2 100 2150 120 1 0.5 106.9501126 Commkope SBNHH-ID65A TMB2D L700 730 60 1 0.5 53.47505629 CommScape SBNHH-1065A TMC3A G1900 1950 40 2 0.5 71.30007505 Commkope SBNHH-1065A TMOB U1900 1950 30 2 0.5 53.47505629 Commkope SONHH-1065A TMC3C L2100 2150 120 1 0.5 106.9S01126 Commkope SBNHH-ID6SA TMC30 L700 730 60 1 0.5 53.475 629 Comm5co SBNHH-ID65A 73.5 88.5 Hexport 4.633333333 14.75 6530 73.5 88.5 Hexiaort 4.633333333 14.75 65;10 73.5 $8.5 Hexpon 4.633333333 14.9S 62;10 73.5 88.5 Hexpon 4.633333333 11.45 66;10 73.5 88.5 Hexpon 4.633333333 14.75 65;250 73.5 88.5 Hexport 4.633333333 14.7S 65;250 73.S 98.5 Hexport 4.633333333 24.95 62;ISO 73.5 88.5 Hexport 4.633333333 11.45 66;ISO 73.5 88.5 Hexport 4.633333333 14.75 65;260 73.5 88.5 Hexpon 4.633333333 14.75 65;260 73.S 88.S Hexpon 4.633333333 14.95 62;260 13-5 - Hexpon 4.633333333 IIAS 66;260 Exhibit 2- Antenna details Predictive Analysis Details For purposes of this analysis, RoofView@ was configured to provide an output based on the appropriate MPE limit(s) published in the FCC's guidelines. The antenna information was loaded into RoofView@, an MPE predictive analysis tool by Richard Tell and Associates. The analysis was run for both the ground and rooftop levels. The map in Exhibit 3-1 is a graphical representation of the predictive emissions on the ground. The map in Exhibit 3-2 is a graphical representation of the predictive emissions at rooftop of the nearby buildings. The solid green shading indicates that power density levels are expected to be less than 5% of the applicable maximum permissible exposure (MPE) level in these areas. Other colors are defined in the legend. Centerline Solutions, Inc. Proprietary and Confidential Page 8 of 16 Prepared fior: T-Mobile, Site: SE01575A Green <= 5% General Public Limit* Muc <-- 20% General Public Limit <= 100% General Public Limit Red > 100% General Public Limit * Exhibit 3-1 (Ground - I.ayout) (Not to scale) Page 9 of 16 Prepared for: T-Mobile, Site: SE01575A Green.<= 5% General Public Limit* Blue 20% General Public Limit <= 100% General Public Limit Red > 100% General Public Limit Exhibit 3-2 (Rooftop - Layout) (Not to scale) Page 10 of 16 Prepared for: T-Mobile, Site: SEO I 575A Conclusions and Recommendations - The results of the analysis indicate that the power density levels at ground and rooftop of the nearby buildings will not exceed FCC MPE limit with the proposed antenna plan. - The risk of accidental exposure from these antennas is being mitigated by an RF alert sign placed at the base of the utility pole which is visible upon approaching to it. - This site will be operating in general compliance with FCC OET Bulletin 65 following the implementation of the changes outlined in this report. No further mitigation is required. Note: Modifications to the site; andlor increases in channel counis or nower levels exceedinz those listed in this revorl vvifl Muire additional evahiation io determine compliance. Page I I of 16 Prepared for: T-Mobile, S ite: S EO 15 7 5 A Appendix A: FCC Compliance and RF Safety Policies In August of 1997, the FCC published OET Bulletin 65 Edition 97-01 to regulate methods for evaluating compliance with FCC guidelines for human exposure to radiofrequency (RF) electromagnetic fields. The FCC guidelines for human exposure to RF electromagnetic fields incorporate two categories of limits; namely "Controlled" (a.k.a. Occupational) and "Uncontrolled" (a.k.a. General Public). The guidelines offer suggested methods for evaluating fixed RF transmitters to insure that the controlled and uncontrolled limits deemed safe by the FC for human exposure are not exceeded. OET Bulletin 65 recommended guidelines are intended to allow an applicant to "make a reasonably quick determination as to whether a proposed facility is in compliance with the limits." In addition, the guidelines offer alternate supplementary considerations and procedures such as field measurements and more detailed analysis that should be used for multiple emitter situations. These guidelines define RF as emissions in the frequency range of 300 kHz to 100 GHz. The FCC define Maximum Permissible Exposure (MPE) limits within this frequency range based on limits recommended by the National Council on Radiation Protection and Measurement, the Institute of.Electrical and Electronics Engineers, LCC. (IEEE), and by the American National Standards Institute (ANSI). The specific MPE limits defined by the FCC are as follows: Frequency Range [MHz] 0.3-3.0 3.0-30 30-300 300-1,500 11,500 - 100,000 Range [MHz] 0.3-3.0 3.0-30 30-300 300-1,500 1,500 - 100,000 f = freauencv Electric Field Strength (E) [Vim] 614 1842/f 61.4 Electric Field Strength (E) [Vim] 614 842/f 27.5 Magnetic Field Strength (H) [Alm) 1.63 4.89/f 0.163 Magnetic Field Strength (H) [Alm] 1.63 2.19/f 0.073 oiled Exposure Power Density (S) [MW/CMA 2] 100* goo/fA 2* 1 f/300 5 Power Density (S) IMW/CMA 21 100* 1 80/fA2* 0.2 f/1500 1 power Averaging Time JEJA 2, JHJA 2 or S [minutes) 6 6 6 6 6 re Averaging Time JEJA 2, JHJA 2 or S [minutes) 30 30 30 30 30 The FCC states that "Occupational/Controlled limits apply in situations in which persons are exposed as a consequence of their employment provided those persons are fully aware of the potential for exposure and can exercise control over their exposure. Limits for occupational/controlled exposure also apply in situations when an individual is transient through a location where occupational/controlled limits apply provided he or she is made aware of the potential for exposure." Page 12 of 16 Prepared for: T-Mobile, Site: SEO I 575A For General Population/Uncontrolled limits, the FCC states that "General populatibn/uncontrolled exposures apply in situations in which the general public may be exposed, or in which persons that are exposed as a consequence of their employment may not fully be aware of the potential for exposure or cannot exercise control over their exposure." For purposes of this analysis, all limits are evaluated against the Power Density limits. Typical guidelines for determining whether occupational/controlled limits can be applied include insuring the environment (such as a rooftop) as limited/controlled access via locked doors or physical barrier that are preferably controlled by a landlord that is aware of the situation and can inform anyone going through the locked door of the. existence of the RF emissions. Such notification/awareness is typically accomplished by means of signage on the door, or other access to the area of concern, as well as signage on or near the antennas. Examples of such signs include the following: Radio frequency flelds beyond this point nuly exceed dle FCC general public exposure llffdt Ob.y.9 posud V- and ft 9.&MIne. for vvodilng In rano Inequency ACAUTION Beyond this point: Radio frequency fields at Us site may exceed FCC rules for human exposum SM Veto nftfl; on" 0 PQMd SWO and .". O.M.4— f. -oldng In ft hequencyenvironawft. Beyond this point: Radio frequency fields at this site exomid the FCC rules for hunwan exposure. F.9— to oby in pobd " .0 sft guld*11nol In, vAwWng In rodia frequency w-bannuents could nmW In wbus lnjury� Standards for when to use each of the above signs for occupational situations are as follows: No sign required: <20% of Occupational MPE Blue Sign, Notice: 20% to <100% of MPE Yellow Sign, Caution: 100% to <1000% of MPE Red Sign, Warning: >1000% of MPE All MPE references are to the FCC Occupational limits. Page 13 of 16 Prepared for: T-Mobile, Site: SE01575A Appendix B: Overview of RoofView@ Functions and Assumptions RoofView@ is a tool develope'd and supported by Richard Tell Associates, LCC. to be used for analysis of RF field levels at telecommunications sites produced by antennas of the type commonly used in cellular, paging, SMR, PCS and two-way radio communications services. Although its name suggests that the tool is only for use in evaluating emissions for roof top applications, it can also be used to evaluate ground level effects of tower facilities. RoofView@ allows the user to apply near field, far field, or a combination of near and far field computational methods as desired by the user. For this analysis, near field computations are used for areas within the near field, and far field computations are used beyond the near field. Specific break points are dynamic based on the aperture of the antenna being analyzed. The near field methodology is based on a cylindrical model that assumes the power into an antenna is distributed as a cylinder�around the aperture of the antenna. Research by Richard Tell Associates, LCC. found that using such a model, along with corrections for height and antenna pattern, is very accurate, if not slightly conservative in estimating RF exposure. FCC Bulletin 65 recognizes the use of the cylindrical model for near field calculations. The following picture computations used by RoofView@ on a used: T III i and corresponding equation summarizes the bin -by -bin basis when the near field method is . S 360 P 0 BW 2nRh 7 3 dB Beam (deg rees) - 0 BW Each bin's results are then also adjusted by spatially averaging the portion of a 6 foot tall human that intercepts the aperture over 6 feet. Once the antenna is completely above (or below) the height that corresponds to a 6 foot tall human, the cylindrical results are Page 14 of 16 Prepared for: T-Mobile, Site: SEO 15 75A reduced to 10% of their results and then dissipated inversely in proportion to the square of the distance. Once bins being analyzed fall outside of the near field (as determined by a method and variable that is user -selectable; see below for method and variable used in this analysis), a far -field spatial average is calculated. Spatially averaged power density in the far -field is calculated by reducing the spatially averaged power density inversely, by the square of the distance from the antenna(s). There are several input variables to RoofView@ that can impact the results produced when evaluating specific cell sites. Those variables are summarized accordingly: Required Inputs for RoofView@ v4.15 Analysis Thresholds Relative to Controlled Limits) >= 0% < 5% >= 5% < 20% >= 20% Y ow < 100% >= 100% Standard FCC 1997 Occupational (default) FCC 1997 General Population (as applicable) Model Near/Far Spatial Average Uptime 100% (vary as applicable) Near/Far Field Transition Method X ApHt Near/Far Field Transition At Ht Factor 1.5 Page 15 of 16 Prepared for: T-Mobile, Site: SE01575A References FCC (1997). "Evaluating Compliance with FCC Guidelines for Human Exposure to Radiofrequency Electromagnetic Fields"; Federal Communications Commission; Office of Engineering and Technology, OET Bulletin 65, Edition 97-01, August. Richard Tetl Associates, LCC. (2003). RoofView@ User Guide Version 4.15, Richard Tell Associates, LCC., February 10, 2003. Limited Warranty Centerline Solutions, LCC. warrants that this analysis was performed in good faith using the methodologies and assumptions covered in this report and that data used for the analysis and report were obtained by Centerline Solutions, LCC. employees or representatives via site surveys or research of T-Mobile's available information. In the event that specific third party details were not available, best efforts were made to use assumptions that are based on industry experience of various carriers' standards without violating any confidential information obtained under non-disclosureterms. Centerline Solutions, LCC. also warrants that this analysis was performed in accordance with industry acceptable standards and methods. There are no other warranties, express or implied, including but not limited to, the implied warranties of merchantability and fitness for a particular purpose, relating to this agreement or to the services rendered by Centerline Solutions hereunder. In no event shall Centerline Solutions be held liable to T-Mobile, or to any third party, for any indirect, special, incidental, or consequential damages, including but not limited to loss of profits, loss of data, loss of good will, and increased expenses. In no event shall Centerline Solutions be liable t6 T-Mobile for damages, whether based in contract, tort, negligence, strict liability, or otherwise, exceeding the amount payable hereunder for the services giving rise to such liability. Page 16 of 16 Y ECTO E n G I n E E R S ProjectNumber: U1194-802-151 October 20, 2015 Cascadia PM, LLC 3320 South Bay Road NE Olympia, WA 98506 ATTENTION: Bryan Underhill STREETFILE RESUB OCT 2 8 2015 DEPAR-ITMENT SU'Ll)y'NOOF C,T EMAONDS REFERENCE: SE01575A— Edmonds Pkwy/SNOPUD/ HECOX 21909 96" Ave W — Edmonds, WA 98020 Structural Mount Analysis for Proposed Antenna and Equipment Installation Dear Bryan, Per your request, we have reviewed the construction drawings prepared by your office for the proposed removal of (3) existing panel antennas and (3) existing tower mounted amplifiers and the addition of (3) new panel antennas and (3) new remote radio units, attached to an existing monopole. Each of the (3) panel antennas is attached to a crossover plate on an 8" standoff arm mounted to a universal ring mount installed at the top of the pole; similarly, the RRUs are mounted with 8" standoff arms to a second universal ring mount a few feet below the top of the pole. In addition to reviewing the proposed construction drawings, we have reviewed as -built construction drawings of the existing antenna configuration prepared by B.J. Thomas, P.E. (Dated: October 5, 2012) and site walk photographs (no time stamp) of the existing antenna mount assembly provided to us by your office. Please be advised as follows: Based upon our calculations and review of the documents noted above, we conclude that the antenna mount assembly, as detailed on construction drawings, is adequate to support the loads associated with the proposed antennas and equipment. Supporting calculations for the gravity and lateral loading on the proposed antennas and Valmont structural analysis letters verifying the capacity of the existing universal ring mount (Valmont part#: LWRM) and 8" standoff arm (Valmont part#: MMO 1) are attached. The recommendations above are provided based upon calculations prepared by our office and information the client provided. A representative from Vector has not visited the site. The analysis and conclusions described above are limited to the members included in this report only and are based on the assumption that the structure was properly designed and constructed. Analysis of the capacity of the existing monopole and foundation are not included in our scope and are to be completed by others prior to modification of the loading configuration. Vector Structural Engineering makes no claim as to the correctness of the original design or the current condition of the structure, which is assumed to be in good condition, free of damage or deterioration. The contractor shall verify the suitability of the existing mounts and the condition of the existing structure and shall notify Vector immediately should any damage, deterioration or discrepancies between the as -built condition of the existing structure and the assumed condition described in this report and on the construction drawings be found. We hope this meets your needs. If you have any further questions regarding this matter, please call our office at your convenience. ..., �'T. A L �w Very truly yours, VECTOR STRUCTU ENGINEERING 9AL EN G Rode,rt Aeortg,' S.h 10/20/15 Principal LICENSED ) I PROFESSIONAL ENGINEER No. 11412-S RTA/Irg EXP. 4-30-16 This work was prepared by me Enclosures or under my supervision. Construction of this project will be under my observation. 9138 S. State St., Suite 101 / Sandy, UT 84070 / T (801) 990-1775 / F (801) 990-1776 / www.vectorse.com Page 2 of 19 JOB NO.: U 1194-802-151 DESIGNED: LRG ECTORDATE: 10/19/15 CHECKED:BDV n 9 1 n L- r= R 8 PROJECT: SE01575A EDMONDS PKWY/SNOPUD/HECOX Desi-aln Criteria: Code: Structural design is based on the International Building Code, 2012 Edition Wind: Basic wind speed = 110 mph (3-second gust) per the ASCE 7-10 standard Risk category: 11 Wind exposure: C Seismic: Seismic loads are based on the International Building Code, 2012 Edition Seismic importance factor, I = 1 Risk category: 11 Mapped spectral response accelerations: Ss = 1.265g S, = 0.495g Site class: D Spectral response coefficients: SDS = 0.843g So, = 0.497g Seismic design category: D Basic se ism ic-force-res isti ng-system: Cantilever Element: Braced below its center of mass Seismic response coefficient, Cs 0.338 Response modification factor, R 2.5 Analysis procedure: Equivalent lateral force General Notes: 1 The contractor shall verify dimensions, conditions and elevations before starting work. The engineer shall be notified immediately if any discrepancies are found. 2 The typical notes and details shall apply in all cases unless specifically detailed elsewhere. Where no detail is shown, the construction shall be as shown for other similar work and as required by the building code. 3 These calculations are limited to the structural members shown in these calculations only. 4 The contractor shall be responsible for compliance with local construction safety orders. Approval of shop drawings by the architect or structural engineer shall not be construed as accepting this responsibility. 5 All structural framing members shall be adequately shored and braced during erection and until full lateral and vertical support is provided by adjoining members. Structural Steel: 1 All structural steel code checks based on the AISC, 14th Edition per the ASCE 7 standard 2 All steel pipe to be per ASTM A53 GR. B (35 KSI), U.N.O. 3 All steel rectangular tubes (HSS) to be per ASTM A500 GR. B (46 KSI), U.N.O. 4 All other structural steel shapes & plates shall be per ASTM A36, U.N.O. 5 All bolts for steel -to -steel connections shall be per ASTM A325N, U.N.O. 6 All bolted connections shall be tightened per the "turn -of -nut" method as defined by AISC. 7 All steel surfaces shall be galvanized in accordance with ASTM Al 23 and ASTM Al 53 standards, thoroughly coated with a rust inhibitive red oxide primer, or otherwise protected as noted on the structural drawings. Page 3 of 19 JOB NO.: U 1194-802-151 DESIGNED: LRG ETO DATE: 10/19/15 CHECKED: BDV n a i n E E R S PROJECT: SE01 575A EDMONDS PKWY/SNOPUD/HECOX SUBJECT: Enclosure Calculations lComponents and Cladding Wind Calculations Label: Wind Pressure SITE -SPECIFIC WIND PARAMETERS: Basic Wind Speed [mph]: 110 Exposure Category: C ADDITIONAL INPUT & CALCULATIONS: Note: Calculations per ASCE 7-10 Height of roof, h [ft]: 90.8 Comp/Cladding Location: Walls & Roofs Enclosure Classification: Enclosed Buildings GCP: 0.9 Figure 30.6-1 (enter largest abs. value) a: 9.5 Table 26.9-1 Zg [ft]: 900 Table 26.9-1 Kh: 1.240 Table 30.3-1 Significant Topography? No -------- > (Figure 26.8-1) Kj: Height of hill, H (ft]: a: K2: Length of hill, Lh [ft Y: K3: Dist to tower, x [ft]: K,t: 1.000 Equation 26.8-1 Kd: 0.85 Table 26.6-1 Velocity Pressure, qh [PSfl: 32.65 Equation 30.3-1 GCpi: 0.18 Table 26.11-1 (largest abs. value) OUTPUT: Ultimate Pressure, p [psfl: 35.27 psf (1.0 Wind) Allowable Pressure, p [psfl: 21.2 psf (0.6 Wind) p -= qh IL—C [G C:PA, KL, P:E Page 4 of 19 JOB NO.: U 1194-802-151 DESIGNED: LRG F=CTOR DATE: 10/19/2015 CHECKED: BDV n G I n E=- E R S PROJECT: SE01575A EDMONDS PKWY/SNOPUD/HECOX SUBJECT:LOADS Label: One sector on upper ring Antenna Equipment: Point Loads Weight Front Side Wind Forces (11. ) Seismic Forces (1.0) Front load Side load Lateral Vertical Quantity (Ibs) area (ft") area (ft') (Ibs) (lbs) (Ibs) (lbs) SBNHH-1D65A 33.5 1 4.55 2.71 160 96 33.9 5.7 FRLB 59.5 1 0.65 1.72 23 61 60.2 10.0 Diplexer 7.9 4 0.39 0.14 14 5 8.0 1.3 Line Loads Weight (Ibs) Length (ft) DiaorWidth (in) Weight (plf) Wind Forces (1-0) (pif)** Seismic Forces (1-0) (pil) 2" STD Steel Pipe 20 1 5.5 1 2.38 1 3.65 1 1 0.0 4.2 3.7 0.6 1 Dead Load, D: Total Weight of Components: WP lb Wind Load, W: Design Wind Pressure: p psf (1.0w) Vtrans 237 lb 0-6 - Vtran, 142 lb Viong 199 lb 0.6 * VI.n, 119 lb Seismic Load, E: Consider Seismic: Occupancy Category: 11 F. = 1.0 Seismic Design Category: D F� = 1.5 1p 1.00 SMS � 1.265 Site Class: D Smi = 0.745 Rp = 2.5 SDS = 0.843 S. = 1.265 SDI = 0.497 S, = 0.495 a, = 0.7 - Fp,min F---26 -Jib Z= ft 0.7 * Fp.max lb h = ft z/h 0.7 * Fp,trans 102 lb 0.7 * Fp,long 102 lb F, lateral 1.012 F, vertical 0.169 0.7 * Fp,,.rt lb 142 LBS < 532 LBS < 1700 LBS Controls over Seismic Controls over Seismic MM01 OK LWRM OK Page 5 of 19 JOB NO.: U 1194-802-151 DESIGNED: LRG DATE: 10/19/2015 CHECKED: BDV enein15-155IRS YECTOR PROJECT: SE01575A EDMONDS PKWY/SNOP1JD/HECOX SUBJECT: LOADS Label: One sector on lower ring Antenna Equipment: Point Loads Weight Front Side Wind Forces 0. ) Seismic Forces (1.0) Front load Side load Lateral Vertical Quantity (Ibs) area (112) area (ft') (Ibs) (lbs) (Ibs) (Ibs) Larger of FXFB & COVP 55 1 3.09 0.98 109 35 55.7 9.3 FRIG 55 1 2.84 1.24 100 44 55.7 9.3 Diplexer 7.9 4 0.39 0.14 14 5 8.0 1.3 Line Loads Weight (Ibs) Length (ft) Dia or Width (in) Weight (plf) Wind Forces (1-0) (pIf)** Seismic Forces (1-0) (plf) Dead Load, 0: Total Weight of Components: WP lb Wind Load, W Design Wind Pressure: p psf (1.OW) Vtrans 263 lb 0.6 * Vtrans 158 lb Vlong 98 lb 0.6 * Vlan. 59 lb Seismic Load, E: Consider Seismic: F--Y—es-7 Occupancy Category: 11 F. = 1.0 Seismic Design Category: D Fv = 1.5 It, = 1.00 SMS = 1.265 Site Class: D SMI = 0.745 Rp = 2.5 SDS = 0.843 S. = 1.265 SD1 = 0.497 S, = 0.495 ap = 0.7 * Fp,min b �b Z = M10 ft 0.7 * Fp._ h = ft z1h 0.7 * Fp,trans 100 lb 0.7 * Fp,l.ng 100 lb F, lateral 1.012 F, vertical 0.169 0.7 * Fp,rt lb 158 LBS < 532 LBS < 1700 LBS Controls over Seismic Controls over Wind MM01 OK LWRM OK Page 6 of 19 N_n 1 0 U Lus A vahnm T cowANY March 22, 2010 RE: ANSI/TIA-222-G Mount Capacity Valmont / Site Pro I Mount: 4'Triple T-Arm with 2 Antenna Pipes PartNo. RDS-23xxx RDS-NP (Ref 2-7/811 Antenna Pipe) MMO1 UDS-NP (Ref 2-7/811 Antenna Pipe) The 4'Tr1ple T-Arm referenced above has been analyzed in accordance with ANSI/TIA-222- G-2005 standard using the following design criteria. Mount Design Criteria Structure Height 200' Basic Wind Speed 90 mph (3-sec) Structure Class 11 Exposure Category C Topographic Category I Design Ice Thickness 1.0" Wind Direction Factor 0.95 Tubular Pole Structures, Lattice Structures with other than triangular, square or rectangular cross -sections, strength design of appurtenances Gust Effect Factor 0.85 Guyed Masts & Self Supporting Lattice Structures 450' tall or less 1.10 Tubular Pole Structures Modehng & Applied Appurtenance Loadin The mount was analyzed for two (2) antenna loads evenly spaced across each face of the mount, centered on the centerline of the mount (i.e. no vertical eccentricity). Based on the Design Criteria above, the mount capacity is 2,140 lbs (67.43 Sq-ft). The maximum normal force per antenna pipe is 1,070lbs (33.71 Sq-ft) with a maximum tangential force of 532 lbs (16.76 Sq-ft). The weight of each antenna was considered to be a maximum of 250 lbs. Self - weight of the mount was also considered. The mount will also support a nominal live load of 250 lbs at one (1) location to provide access for a climber. This condition assumes no wind. ARROO Valmont Site Pro 1 2400 Walter Glaub Drive Plymouth, Indiana 46563-4005 USA AMICWFLECT 574-936-4221 Fox 574-936-8925 www.siteprol.com Page 7 o 19 GUST FACTOR BASED ON: 3 1. latticed tower, overall height = antenna height 2. latticed tower, overall height = 200 ft 3. monopole tower 4. Guyed Tower 5. Structure supported on other structures Radial Ice Thickness: I inch Structure Class: 2 See Worksheet "Structure Class" for Description Exposure Category C See Worksheet "Exposure Category" for Description Topography Category I See Worksheet "Topography Category" for Description eight of Crest Above Surrounding Area, H 1 (ft) If 0 ft, use 1.0 Height Above Ground Love] at the Base of the Structure, z 0 (ft) Wind Direction, Kd 0,95 See Worksheet "Wind Diroction " for Description (EPA),, (ft) 0 0 (EPA), (ft') See Worksheet "Wind Force on Appurtenances" for Description 0 0 K. i.00 A f 0 Projected area of flat structural components in one face of the section Projected area of round structural components in one face of the section A r including the projected area of Ice on flat and round structural components 0 In one face for loadina combinations that include Ice. Ag 25 Gross area of one face as if the face were solid, sqft. E 0.000 solidity ratio = (Af + A,)/Ag Effective Projected Area (EPA)A for Maxlmum-Allowable Mount Load on 4'Triple T-Arm (RDS-23xx) with 2 Antenna Pipes (sq-ft) WIND LOAD: 2.1400 kips HEIGHT BASIC WIND SPEED Imph) (ft) 70 75 80 85 90 95 100 105 110 115 120 40 156.4355 136.2727 119.7709 106.0947 94.6338 84.9345 76.6534 69.5269 60 143.6361 125.1230 109.9714 97.4141 86.8910 77.9852 70.3817 80 135.1950 117.7699 103.5087 91.6893 81.7846 73.4023 66.2456 100 128.9907 112.3653 98.7585 87.4816 78.0314 70.0338 120 124.1334 108.1340 95.0397 1 84.1874 75.0931 67.3966 1 140 120.1696 104.6811 92.0049 81.4991 72.6952 160 116.8385 101.7793 89.4545 79.2399 70.6801 180 113.9769 99,2866 87.2636 77.2992 68.9490 200 111.4766 97.1085 85.3493 75.6035 67.4365 220 1 109.2621 1 95.1794 83.6538 74.1016 1 hilpi//plystnvebliEngineeringit.4ount Area and Capacity/Windload Rev 0 (Revised) 3122/2010 3:56 Phi GUST FACTOR BASED ON: 3 1. latticed lower, overall height = antenna height 2. latticed tower, overall height = 200 ft 3. monopole tower 4. Guyed Tower 5. Structure supported on other structures Radial Ice Thickness: I inch Structure Class: 2 See Worksheet "Stnicture Class" for Description Exposure Category C See Worksheet "Exposure Calegoiy" for Description Topography Category eight of Crest Above Surrounding Area, H 1 1 See Worksheet "Topography Categoty" for Description Height Above Ground Level at the 00 If 0 it, use 1.0 Base of the Structure, z 0 (ft) Wind Direction, Kd 0.95 See Worksheet "Wind Direction I, for Description (EPA)N (ft2) 0 (EPA)T (ft) 0 0 0 See Worksheet "Wind Force on Appurtenances" for Description Ka i.00 A f 0 Projected area of flat structural components in one face of the section A r Projected area of round structural components in one face of the section including the projected area of ice on flat 0 and round structural components in one face for loadina combinations that include ice. Aq 25 Gross area of one face as if the face were solid, sqft. C 0.000 solidity ratio (At + A,)/Ag Effective ProJected Area (EPA)A for Maximum Allowable Normal Load on 4'Triple T-Arm (RDS-23xx) with 2 Antenna Pipes (sq-ft) WIND LOAD: 1.0700 kips EIGHT BASIC ill i�� i 1EE1 i 1 11' 11 1 40 70 78.2178 75 68.136 80 59-8855 85 53.0473 90 95, 10'0 105 110 116 120 473169 42.4673 60 71-81 8o 62.5615 54-9857 48.'7070 43' .4455 38.9926 38.3267 34.7634 35.1908 80 67.5975 58.8849 51.7543 45.8447 40-8923 36.7011 33.1228 100 64.4954 56.1826 49 * 3793 .7408 39.0157 35,0169 120 62 ' 0667 54.0670 47-6198 42.0937 37.5dAX; 140 60.0848 52.3406 46.0024 40.7496 6.3476 160 58.4192 50.8897 44.7272 3 180 56.9885 49.6433 AA AA 1 A 'I 200 55.738" An rr- ?20 64.6311 1 47.5097 1 41.8269 1 37, 19 bltp:liptystF%,tebl/Engineeringit,lount Area and CaPaCilyWindload Rev G (Revised) 312212010 3:56 Phi Page 9 o 19 GUST FACTOR BASED ON: 3 1. latticed tower, overall height = antenna height 2. latticed tower, overall height = 200 ft 3. monopole tower 4. Guyed Tower 5. Structure supported on other structures Radial Ice Thickness: 1 inch Structure Class; 2 See Worksheet "Structure Class" for Description Exposure Category C See Worksheet "Exposure Categoty" for Description Topography Category I See Worksheet "Topography Category" for Description eight of Crest Above Surrounding Area, H I (ft) If 0 ft, use 1.0 Height Above Ground Level at the Base of the Structure, z 0 00 Wind Direction, Kd 0,96 See Worksheet "Wind Direction " for Description (EPA)N (ft) 0 (EPA)T (ft2) 0 See Worksheet "Wind Force on Appurtenances" for Description 0 0 Ka 1-00 A f 0 Projected area of flat structural components in one face of the section Projected area of round structural components in one face of the section A r including the projected area of ice on flat and round structural components 0 in one face for loadina combinations that include ice. Ag 26 Gross area of one face as if (he face were solid, sqft, E 0.000 solidity ratio = (Af + A,)/Ag Effective Projected Area (EPA)A for Maximum Allowable Tangential Load on 4' Triple T-Arm (RDS-23xx) with 2 Antenna Pipes (sq-ft) WIND LOAD: 0,5320 kips HEIGHT BASIC WIND SPEED (mph) 00 70 75 80 85 90 95 100 105 110 115 120 40 38.8896 33.8771 29,7748 26.3749 23.5258 21.1146 19.0559 17.2843 60 35.7077 31.1053 27.3387 24.2170 21.6009 19.31370 17.4968 80 33.6092 29.2774 25.7321 22.7938 20.3315 18.2477 16.4685 100 32.0669 27.9338 24.5512 21.7478 19.3985 17.4103 120 30.8593 26.8819 23.6267 1 20.9288 18.6680 16.7547 1 1 140 29.8739 26.0235 22.8722 20.2605 18.0719 160 29.0458 25.3021 22.2382 19.6989 17.5709 180 28.3345 24.6825 21.6936 19.2164 17.1 200 27.7129 24.11410 21.2177 18.7949 16.7646 220 fT7.1624 1 23.6614 20.7962 , 18.4216 1 1 1 hilp!//plystf%-iebt/EngineeFing/Liount Area and Capacity/windload Rev G (Revised) 312212010 3:56 PIA Page 10 of 19 SITE PRO A vaknordW compAw Feb 22, 2010 RE: ANSI/TIA-222-G Mount Capacity Valmont / Site Pro I Mount: Ring Mount Assembly Part No. LWRM The Ring Mount Assembly referenced above has been analyzed in accordance with ANSI/TIA-222-G-2005 standard using the following design criteria. Mount Desigga Criteri Structure Height 200' Basic Wind Speed 90 mph (3-sec) Structure Class II Exposure Category C Topographic Category I Design Ice Thickness 1.0" Wind Direction Factor 0.95 Tubular Pole Structures, Lattice Structures with other than triangular, square or rectangular cross -sections, strength design of appurtenances Gust Effect Factor 0.85 Guyed Masts & Self Supporting Lattice Structures 450' tall or less 1.10 Tubular Pole Structures Modeling & Applied Appurtenance Loadin The mount was analyzed for three (3) different loading scenarios. See page 2 for results. Volmont Site Pro I A P.-non 2400 Walter Glaub Drive Plymouth, Indiana 46563-4005 USA AmlawawT 574-936-4221 Fox 574-936-8925 www.siteprol.com Page 11 of 19 SITE P,uFN ja-V-19 A vaknmdV oawAw Modeling & Applied Upurtenance Loading ScenArio 1 The Ring Mount Assembly (LWRM) was analyzed with an evenly distributed load on each Ring Mount weldment (X-LvVW with an 18" moment arm. Based on the Des' ign Criteria above, the maximum acceptable normal force is 5,060 lbs (159 sq ft) and the maximum acceptable tangential force is 3,200 lbs (100 sq ft) per weldment. The allowable applied weight (mount plus antenna) was considered to be a maximum of 1,700 lbs per weldment. Self -weight of the assembly was also considered. Modeling & Applied Appurtenance Loading Scen rio 2 The Ring Mount Assembly (LXVW was analyzed with an evenly distributed load on each Ring Mount weldment (X-LVVW with a 36" moment arm. Based on the Design Criteria above, the maximum acceptable normal force is 2,530 lbs (79 sq ft) and the maximum acceptable tangential force is 1,600 (50 sq ft) lbs per weldment. The allowable applied weight (mount plus antenna) was considered to be a maximum of 860 lbs per weldment. Self -weight of the assembly was also considered. Modeling & Applied Upurtenance Loading Scen rio 3 The Ring Mount Assembly (LXXTM) was analyzed with an evenly distributed load on each Ring Mount weldment (X-LVVTd\/I) with a 48" moment arm. Based on the Design Criteria above, the maximum acceptable normal force is 1,900 lbs (59 sq ft) and the maximum acceptable tangential force is 1,200 lbs (37 sq ft) per weldment. The allowable applied weight (mount plus antenna) was considered to be a maximum of 650 lbs per weldment. Self -weight of the assembly was also considered. Live load Rating: The mount will also support a nominal load of 5,000 lbs at a position less than 6" from the mounting surface (climber anchorage or safety climb). This condition assumes no wind without additional loading from mounts or antennas. This mount will also support a norruinal. load of 500 lbs located at two (2) locations simultaneously (500 lbs total) to provide access for climbers. This condition assumes no wind, but does include the self weight of the mount, platform, and antennas. AP.-Ron Valmont Site Pro I 2400 Walter Glaub Drive Plymouth, Indiana 46563-4005 USA 07MCWFLEICT 574-936-4221 Fox 574-936-8925 www.siteprol.com Page 12 of 19 GUST FACTOR BASED ON: 3 1. latticed tower, overall height = antenna height 2. latticed tower, overall height = 200, ft 3. monopole tower 4. Guyed Tower 5. Structure supported on other structures Radial Ice Thickness: 1 inch Structure Class: 2_ See Worksheet "Structure Class" for Description Exposure Category C See Worksheet "Exposure Category" for Description Topography Category I See Worksheet "Topography Category" for Description eight of Crest Above Surrounding Area, H .1. (ft) If 0 ft, use 1.0 Height Above Ground Level at the Base of the Structure, z 0..:...! (ft) Wind Direction, Kd �0.95. See Worksheet "Wind Direction" for Description 2 (EPA)N (ft .:.0 (EPA)T 0. See Worksheet "Wind Force on Appurtenances" for Description 0 -0 Ka .1-00: A f 0 Projected area of flat structural components in one face of the section ':::Projected area of round structural components in one face of the section A r .*:,..".,.'including the projected area of ice on flat and round structural components in one face for loadina combinations that include ice. Ag '.Gross area of one face as if the face were solid, sqft. E 'o.00d. "Solidity ratio (Af + Ar)/A9 Effective Projected Area (EPA)A for Maximum Normal Reaction Load on Ring Mount Weldment (X-LWRM) with 18" Arm (sq ft) WIND LOAD: :�': 5;0600 wkips HEIGHT BASIC WIND SPEED (mph) (ft) 70 75 80 85 90 95 100 105 110 115 1:20 40 369.8896 322.2149 283.1967 250.8594 223.7604 200.8265 181.2459 164.3954 60 339.6255 295.8515. 260.0258 230.3342 205.4525 184.3950 166.4165, 80 319.6667 278.4652 244.7448 216.7982 193.3786 173.5586 1.00 304.9968, 265.6861 233.5132 206.8490 184.5042 165.5938 1:20 293.5118 255.68141224.7200 199.0599 177.5565 159.35821 1 140 284.1394 247.5170 217.5442 192.7035 1,71.8868 1.60 276.2630 240.6557 211.5138 187.3617 167.1220 180 269.4965 234.7617 206.3335 � 1'82.7730 163.029b. 200 263.5849 229.6117 201.8072 178.7635 159.4526 220 258.3487 1225.0504 1,97.79821 175.21:23:1 http://plysirwobl/Engineering/Mount Area and Capacity/Windload Rev G (Revised) 1219/2009 1:59 PM Page 13 of 19 GUST FACTOR BASED ON: 3 1. latticed tower, overall height = antenna height 2. latticed tower, overall height = 200 ft 3. monopole tower 4. Guyed Tower 5. Structure supported on other structures Radial Ice Thickness: 1, inch Structure Class: 2 See Worksheet "Structure Class" for Description Exposure Category ..0 :See Worksheet "Exposure Category" for Description Topography Category I See Worksheet "Topography Category" for Description eight of Crest Above Surrounding Area, H (ft) If 0 ft, use 1.0 Height Above Ground Level at the Base of the Structure, z '0 Wind Direction, Kd See Worksheet "Wind Direction" for Description (EPA)N (EPA)T 0: "Wind See Worksheet Force on Appurtenances" for Description 0 �0 Ka 1.00 A f 0 Projected area of flat structural components in one face of the section d. Projected area of round structural components in one face of the section A r *, including the projected area of ice on flat and round structural components 0 in one face for loadina combinations that include ice. Ag 2 5 Gross area of one face as if the face were solid, sqft. 0.000 solidity ratio = (Af + Ar)/A9 Effective Projected Area (EPA)A for Maximum Tangential Reaction Load on Ring Mount Weldment (X-LWRM) with 18" Arm (sq ft) WIND LOAD: 3.2000 kips HEIGHT BASIC WIND SPEED (mph) (ft) 70 75 80 85 90 95 100: 105 110 1:15 120 40 233.9223 203.7723 179.0967 158.6463 141.5085 127.0049 114.6219 103.9655 60 214.7829 1'87.0998 � 1:64.4432 145.6659 129.9304 116.61:34 105.2436 80 202.1608 176.1045 154.7793 137.1056 122.2948 109.7604 100 192.8834 1:68.0228, 147.6763 130.8136 116.6825, 1,04.7234 120 185.6201 161.69571 142.1154 125.8877 112.28871 100.7799 1 140 17M929 156.53251 137.5774 121.8679 108.7031 160 174.7118 152.1933 133.7637 118.4896 105.6898 180 170.4328 148.4659 130.4876 11,5.5876 103.1,013; 200 1 166.6940 145.2090 127.6251 113.0520 100.8396 220 1 163.3826 142.3244 1 25.0898,1� 110.8062 http://plystrwobi/Engineering/Mount Area and CapacityMindload Rev G (Revised) 12/9/2009 1:57 PM PARTS LIST ITEM QTY PART NO. PART DESCRIPTION LENGTH UNITWT. NET WT. 1 1 X-WWM0l S" STAND-OFF ARM / WALL MOUNT 18.12 18.12 2 4 A682112 6/8" x 2-1/2" HDG A326 HEX BOLT 2 112 in 0.33 1.34 3 4 A58FW 618" HDG A325 FLATWASHER 0.03 0.14 4 4 G58LW 5/8" HDG LOCKWASHER 0.03 0.10 5 4 A58NUT 5/8*'HDG A326 HEX NUT 0.13 0.62 6 6 2 2 X-UB1212 X-UB1300 1/2" X 2-112" X 4-112" X 2** GALV. U-BOLT 1/2" X 3" X 5" X 2" GALV U-BOLT 0.66 0.70 1.31 1.39 6 2 X-UB1358 112" X 3-518" X 5-1/2" X 3" GALV U-BOLT 0.77 1.64 7 4 G12FW 1/2" HDG USS FLATWASHER 0.03 0.14 8 4 G12LW 1/2" HDG LOCKWASHER 0.01 0.06 9 4 -19NUT 112" HnG HEAVY 2H HEX NUT 0.07 0.29 TOTAL WT. 111 26.06 A 2-318" OD PIPE, 2-718" OD PIPE or 3-1/2" OD PIPE, PIPE NOT INCLUDED QErAIL A TOLERANCE NOTES Locations: DESCRIPTION New York, NY TOLERANCES ON DIMENSIONS, UNLESS OTHERWISE NOTED ARE: 6" STAND-OFF Engs—ed,g AII-t.. GA SJAWED. SHEARED AND GAS OUT EDGES (* 0,M') ANTENNA WALL MOUNT, Support Tem: L.. Ang.l.., CA DRtLLED AND SAO OUT HOLES (*GO$" - NO CONING OF HOLES SITE PRO 1 1-888-753-7446 Plymouth, IN SaWm. OR LAM CUT EDGES AND HOLES (*42010') - NO CONING OF HOLES Avalmontir� Dall-, TX BENDS ARE 2112 DEGREE CPO NO. DRAWN BY ENG.APPR VAL PART NO. ALL OTHER MACHINING (4 OLM-) ALL OTHER ASSEMBLY OGM-) 47114 RI-118 3123/2010 mmol CLASS SUB DRAWING USAGE CHECKEDBY DWG.. 0. 81 01 CUSTOMER BMC 5/10/2010 mmol -F� 21 8 (SEE IN GE 3) r— PA 24" 0 STAN (CUT AS R LENGTH )THE :TER. IAY BE CUT EQUIRED. 4-LI 9 17132" INMI 0 M,10-- NMI 1-- I'Mm 110111111 IM1 IMN I im-, Fm-1 TOLERANCE NOTES DIMM LEP OTHERINISE NOTED ME: AND= TXMI. SH1=D ED, , Raw" DRILLEDAND QASCUT HOLES (*dLGM- NOODNING OF HOLES LASER OUT EDGES AND HOLES (* 0,0109 - NO CONING OF HOLES BENDS ARE * 112 DEGREE ALL OTHER MACHINING (* 4LM-) ALL OTHER ASSEMBLY (* 0,=-) ITEMICITY1 PARTNO. PARTOESCRIPTION LENGTH UNITWT. I NETWT. 1 3 XmLWRM RING MOUNT WELOMENT 68.16 204.48 2 9 GSBR-48 5/8" It 48"THREADED ROD (HDG.) 48 in 4.18 37.63 3 9 G58R-24 518" x 24" THREADED ROD (HDG.) 24 in 2.09 18.82 4 18 A58FW 5/8" HDG A326 FLATWASHER 0.03 0.61 5 18 G58LW 518" HDG LOCKWASHER 0.03 0.47 6 18 A58NUT 518" HDG A326 HEX NUT 0.13 2.34 TOTAL WT. 0 264.35 DESCRIPTION RING MOUNT ASSEMBLY 12"TO 45"DIAMETER POLE 4433 1 BMC 3117120091 DRAWING USAGE I CHECKED BY CUSTOMER CEK 8124/2012 No. Y-k. NY E.gi.—Hng Abumto, GA Support Team: Lot, CA Plym—'h JN &Vatnvcatlw� Salem. OR D.It-, TX 0 T NO. LWRM 1. 1. NO. LWRM c.n 0 8 IN (SEE PAGE 3) \0 9 1 132"' :E7.1 �4= :71 - =--: P/N RM-ADK OPTIONAL LARGE DIAMETER ADAPTER ASSEMBLY FOR USE WITH LWRM (SOLD SEPARATELY) PARTS LIST ITEM QTY PART NO. PART DESCRIPTION LENGTH I UNIT WT. F NET WT. 1 6 X-178627 BENT EXTENSION BRACKET 16.80 94.79 2 is A5802 518" x 2" HDG A325 HEX BOLT 2in 0.27 4.89 3 is G68LW 618" HDG LOCKWASHER 0.03 0.94 4 18 A58NUT 6/8" HDG A325 HEX NUT 013 468 61W* (REF) TOLERANCE NOTES TOLERANCES ON DIMENSIONS. UNLESS OTHERMSE NOTED ARE: SAWED. SHEARED AND GAS CUT EDGES 0 dM7 DRILLED AND GAS CUT HOLES (*90" - NO CONING OF HOLES LASER CUT EDGES AND HOLES N a0107 - NO CONING OF HOLES SENDS ARE 1112 DEGREE ALL OTHER MACHINING (* AM-) ALL OTHER ASSEMBLY (4 GOO-) DESCRIPTION RING MOUNT ASSEMBLY 12" TO 45" DIAMETER POLE 4433 1 BMC 3/17/20091 IT.T—SU. I RAII.N. U.A.E ..".70 a' — !J-01 CUSTOMER JCEK 8/2412012 36" TO 60" DIAMETER MONOPOLE TOTAL WEIGHT: 105.309 A LWRM ASSEMBLY (SEE PAGE 1) Locati— New Y�WNY Engineering Atlent., GA SupportT.— Avalmomw6wIlmiII, Lo. Angel—, CA Plymouth, IN Sete., OR DaIIas,TX T NO. RM-ADK NO. -n m LWRM ��j to to . a) R 8 VALMONT IS SUPPLYING THE VALUE OF THE "W" DIMENSIONS TO ASSIST THE ERECTOR IN PRE -ASSEMBLING THE CLAMPS & TIE RODS. POLE DIAMETER IS CALCULATED FROM MEASURED CIRCUMFERENCE THE CIRCUMFERENCE IS THE DISTANCE MEASURED AROUND THE OUTSIDE OF THE POLE AT THE LOCATION OF THE CLAMP. CIRCUMF DIA (REF) W CIRCUMF DIA (REF) W CIRCUMF DIA (REF) W CIRCUMF DIA (REF) W CIRCUMF DIA (REF) W CIRCUMF DIA(REF) W 38" 12-118" 9�3116" 63. 20-1/16" 16-3116" 88" 28" 23-3116" 113" 36" 30-3116" 138' 43-16116" 37-114" 163" 51-7/8" 44-5116" 39" 12-7116" 9-7116" 64" 20-318" 16-7116" 89.. 28-5116" 23-112" 114" 36-5116" 30-112" 139" 44-114�' 37-1/2" 164" 52-.V16" 44-9116" '40.. 12-314" 9.314" 65" 20-11116" 16-314" 90" 28-518" 23-314" lis" 36-518" 30-314** 1,w.. 44-91`16- 37-13/16" 165' 52-112" 44-7/8" 41" 113-1116" 10" 21" 17" 91.. 28-15116" 24-1116" 116" 36-15116" 31-1116- 141" 44-718" 38-1116" 166" 52-13116" 45-3116" 42" 13-3/8- 10-5/16" 67" 21-5/16" 17-5/16' 92" 29-5116** 24-5116" lir, 37-114" 31-5116" 142" 45-3116" 38-3/8" l6r' 53-3116" 45-7116" 1*1. 13-11116" 10-9116" 68" 21-618" 17-9116" 93" 29-5/8" 24-5/8" Ila" 37-9116" 31-5/8" 1'*.. 45-112" 38-9/16" 168" 53-112" 45-3/4" 14" 10-7/8" 69.. 21-15116" 17-7/8" 94" 29-16116" 24-7/8" 1191, 37-7/8" 31-7/8" 1".. 45-13116" 38-718** 169" 53-13116" 46" '151. 14-5116" 11-2116" 70" 22-5/16" 18-1/81, 95" 30-1/4" 26-1 /8" 120" 38-3116" 32-3/16" 1".. 46-1/8" 39-118" 170" 54-1/8" 465/16" 14-518" 11-3/8" 71" 22-518" 18-7116" 96" 30-9/16" 25-7/16" 121" 38-1/2" 32-7116" 1".. 46-112" 39-7/16" 1171" 54-7116" 46-9/16" 47" 14-15116" 11-11116" 72" 22-16116" 18-11116" 97" 30-7/8" 25-11116" 122" 38-13/16" 32-3/4" 147" 46-13116" 39-3/4" 172" 54-3/4" 46-7/8" 'a.. 15-114" 11 -16116" 73" 23-1/4" 19.1 98.. 31-3116" 26" 123" 39-1/8" 33" 49" 15-518" 12.1/,V' 74" 23-9116" 19-1/4" 99.. 31-1/2" 26-IW' 124�' 39-1/2" 33-5/16" 149" 47-7/16" 40-5/16" 174" 55-3/8" 47-7116" so.. 15-15116*1 12-1/7* 75" 23-7/8" 19-9116" 1001, 31-13116" 26-9/16" 125" 39-13/16" 33-9/16" 160" 47-314" 40-9116" 175** 55-11116" 47-11 /1 v- si.. 16-114" 12-13116" 76" 24-114" 19-13116" loll, 32-118" 26-13116" 126" 40-1/8" 33-718" 15111 48-1116" 40-7/8" 176" 56" 48" 52" 16-9116" 13-1116" 77" 24-1/2" 20-1/8" 102" 32-7116- 1 27" 12T' 40-7/16- 1 34-118" 152" 48-318" 1 41-3116" 177" 56-6116" 48-1/4" 53" 1 16-718- 13-318" 78" 24-13116" 20-3/8" 103** 32-13116" 27-3/8- 128" 40-3/4" 34-7/16" 153" 48-11116" 41-7116" 178" 56-11/16" 48-9116" W. 17-311W' 13-51W' 79" 25-118" 20-11116" 104" 33-118" 27-11116" 129" 41-1116" 31-11116" 154' 49" 41-3/4" 179** 57" 48-7/8" 55" 17-1 f2" 13-15116" 80.. 25-7116' 20-15116" 105" 33-7116" 27-15116" 130" 41-3/8" 35" '156" 49-5116" 42" 1801, 57-5116" 49-1/8" 56" 17-13/16" 14-3116" 81.1 25-13116" 21-1/4" 106" 33-314- 28-1/4" 131" 41-11116** 35-11W' 1561, 49-11116" 42-5116" 18111 57-518" 49-7/16" 57" 18-118" i4-lir 82" 26-118" 21-1/2" 107" 34-1/16" 28-112" 132" 42" 35-9116" 157" 50" 42-518" 182" 57-15116" 49-11116" W. 18-7116" 14-314" 83" 26-7116" 21-13/16" 108" 34-318" 28-13116" 133" 42-5/16" 35-13/16" ISS" 50-5116" 42-718" 183" 68-1/4" 50" 59.. 18-314** 15-1/16" 84. 26-3/4" 22-1116" 109" 34-11116" 29-1/16" 1 U.. 42-6/8- 36-118" 159" 5M/S" 43-3/16" 184" 58-9/16" 50-1/4" 60" 19,18" 1 15-5116-- 85" L-"' 1 3 -212; 29-318- 135- 'Q'. 6-2!2 1 160" 50-15116" 43-7116" ias" 58-7/8" 50-9116" 61" TRITF '15-51 :27;"; 277-.81� 232-518; 11112 3g375111" 29-5/8- 1 136" 43 5116" 1 121 43-314" 1�t' t9-3141' 50-13116" 62" 19-314" 15-71.% 27-11116" 1 22-15116" 1 112" 1 36-618- 29-15/16" 1 13r' 1 36-15/16" 1 1 2;; 51-9116" 1 187" 59_112 si.. 188*1 189" 59-13/16" 60-3116" 51-3/8" 51-11/16" TOLERANCE NOTES TOLERANCES ON DIMENSIONS. SAWED. SHEARED AND GAS DRILLED AND GAS CUT HOLES LASER CUT EDGES AND HOLES BENOSARE2 112 DEGREE ALL OTHER MACHINING 4* OLM-) ALL OTHER ASSEMBLY 0 4=7 UNLESS OTHERWISE CUT EDGES (*QM7 (*0,00 - NO (*6,010 - NO NOTED CONING OF HOLES CONING OF HOLES ARE' 'DESCRIPTI N RING ASSEMBLY 12" TO 45" MOUNT DIAMETER POLE Support 1-888-753-7446 Now E.gi ... ri.g AU..t., Team: I— L-Ilymo!-th"IN Sale.. D.1tee, York, NY GA CA OR TX CPD NO. 4433 DRAWN BY BMC 3/17/2009 ENG.APPR VAL PART NO. 1 LWRM W I A IREDRA IN IN INV, UPDATED TABLES& VIEWS I 1KCS1 'apeat"I'maY ��—A-- CLASS 81 SU 01 DRAWING USAGE CUSTOMER CHECKED By I CEK 8/24/20121 — DWG. NO. LWRM 1 REV I DESCRIPTION OF REVISIONS I CPD I BY I I REVISIONHISTORY 10/19/2015 Search Results for Map Page 18 of 19 ASCE 7 Windspeed ASCE 7 Ground Snow Load Related Resources Sponsors About ATC Contact Search Results Query Date: Mon Oct 19 2015 Latitude: 47.8003 Longitude: -122.3615 ASCE 7-10 Windspeeds (3-sec peak gust in mph*): Risk Category 1: 100 Risk Category 11: 110 Risk Category III -IV: 115 MRI** 10-Year: 72 MRI** 25-Year: 79 MRI** 50-Year: 85 Ii 100-Year: 91 ASCE 7-05 Windspeed: 85 (3-sec peak gust in mph) ASCE 7-93 Windspeed: 70 (fastest mile in mph) *Miles per hour Mean Recurrence Interval Users should consult with local building officials to determine if there are community -specific wind speed requirements that govern. M= —I Print your results .......... Z Q A V W% WINDSPEED WEBSITE DISCLAIMER While the information presented on this website is believed to be correct, ATC and its sponsors and contributors assume no responsibility or liability for its accuracy. The material presented in the windspeed report should not be used or relied upon for any specific application without competent examination and verification of its accuracy, suitability and applicability by engineers or other licensed professionals. ATC does not intend that the use of this information replace the sound judgment of such competent professionals, having experience and knowledge in the field of practice, nor to substitute for the standard of care required of such professionals in interpreting and applying the results of the windspeed report provided by this website. Users of the information from this website assume all liability arising from such use. Use of the output of this website does not imply approval by the governing building code bodies responsible for building code approval and interpretation for the building site described by latitude/longitude location in the windspeed load report. Sponsored by the ATC Endowment Fund - Applied Technology Council - 201 Redwood Shores Parkway, Suite 240 - Redwood City, Califonnia 94065 - (650) 595-1542 http:/AAtindspeed.atcouncii.orgri ndex.php?opbon=com—content&view=arbcle&id= 10&dec= I&Iabtude--47.800278&longitude=- 1 22.361472&risk_category_i= 1 00&r... 1/1 10/19/2015 Design Maps Summary Report WM Design Maps Summary Report M User —Specified Input Report Title Edmonds Pkwy Mon October 19, 2015 18:15:03 UTC Building Code Reference Document 2012 International Building Code (which utilizes USGS hazard data available in 2008) Site Coordinates 47.800280N, 122.36147OW Site Soil Classification Site Class D - "Stiff Soil" Risk Category I/II/III _j 5000M Kilngstan Indianola - �`o !1S,mapiquesit' USGS-Provided Output Ss = 1.265 g S, = 0.495 g 02015 S,s = 1.265 g S,, = 0.745 g 10 J. S,s = 0.843 g S,, = 0.497 g Will Greloll(,­ 0) A North Cr- 0 4L Me oddi Mano'r.,—,N 1'e r r a 0 malliquest Page 19 of 19 For information on how the SS and S1 values above have been calculated from probabilistic (risk -targeted) and deterministic ground motions in the direction of maximum horizontal response, please return to the application and select the "2009 NEHRP" building code reference document. MCER Response Spectrum 1.43-- 1.30-- 0.79 0.65- 0.52- 0. 39 - F_ 0.26-- 0.13-- 0,00 1- 0.00 0.20 0.40 O.Go 0.20 1.00 1.20 1.40 1.60 1.�90 2.00 Period, T (sec) Design Response Spectrum 0.99 0.90-. 0.91 __ 0.72-- 0.63-- 0.54-- r il 0.45- A 0. 36 - 0.27-- 0.19-- 0.03 0.00 1 0. 0 0.20 0.40 0.60 0.90 1.00 1.20 1.40 1.60 1.20 2.00 Period, T Isec) Although this information is a product of the U.S. Geological Survey, we provide no warranty, expressed or implied, as to the http://ehpl-earthquake.cr.usgs.gov/designmaps/us/summary.php?template=minimal&Iattude=47.800278&longitude=-122.361472&siteclass=3&riskcategory=0... 1/2 Existing LRECEOVED APPROX. NOV 2015 PHOTO LOCATIoIsDEVELOPMENT SEPMES COUNTER Mobile 0- Im, mr-p-mull. PROPOSED ANTENNA EDMONDS PKWY LOCATIONS w Looking North (3) (N) T-MOBILE PANEL ANTENN S & (3) (N) FRLB RR S MOUNTED TO (E) 90.1 - AGL WOOD UTILITY POLE -SEE NOTES Proposed NOTES: 1. PM/GC TO VERIFY PAINTING REQUIREMENTS WITH JURISDICTION PRIOR TO ORDERING SUPPORT STRUCTURES, IF= —1 F--n -u- ff--,n m L-j n n,.-ir u =D ATTACHMENTS, ANTENNAS, AND OTHER APPURTENANCES. *CENTERLINE 2. VISUAL IMPACTS WILL BE AFFECTEGBY LOCATION AND VISIBILITY OF OBSERVER. THIS DOCUMENT IS FOR PLANNING AND INFORMATION PURPOSES ONLY AND IS CONCEPTUAL. THIS IS SOLELY THE PHOTOGRAPHER'S SOLUTIONS INTERPRETATION OF THE PROPOSED DEVELOPMENT 1 #APPROX. T m mMobile, w PHOTO m LOCATION CO 0 APPROX. Ll- PROPOSED 0 EDMONDS PKWY ANTENNA < LOCATIONS EE Looking Northeast w er Existing F=0 " c:::i -iF ca Em- i " " i i c=j r-4 *CENTERLINE SOLUTIONS (3) (N) T-MOBILE PANEL ANTENNAS & (3) (N) FRLS RRUS MOUNTED TO (E) 90.1'AGL WOOD UTILITY POLE -SEE NOTES Proposed NOTES: 1. PM/GC TO VERIFY PAINTING REQUIREMENTS WITH JURISDICTION PRIOR TO ORDERING SUPPORT STRUCTURES. ATTACHMENTS, ANTENNAS, AND OTHER APPURTENANGES. 2. VISUAL IMPACTS WILL BE AFFECTED BY LOCATION AND VISIBILITY OF OBSERVER. THIS DOCUMENT IS FOR PLANNING AND INFORMATION PURPOSES ONLYAND IS CONCEPTUAL. THIS IS SOLELY THE PHOTOGRAPHER'S INTERPRETATION OF THE PROPOSED DEVELOPMENT. < 0 APPROX. m mMobile, PHOTO LOCATION CO LL APPROX. PROPOSED EDMONDS PKWY ANTENNA 77� < LOCATIONS -f7 Looking South i% -4 Existing Proposed NOTES: 1. PM/GC TO VERIFY PAINTING REQUIREMENTS WITH JURISDICTION PRIOR TO ORDERING SUPPORT STRUCTURES, IF= D--§ 1--11 -9- C3 -c=3 0 r'4 L-D L- 0 ATTACHMENTS, ANTENNAS, AND OTHER APPURTENANCES. *CENTERLINE 2. VISUAL IMPACTS WILL BE AFFECTED BY LOCATION AND VISIBILITY OF OBSERVER. THIS DOCUMENT IS FOR PLANNING AND INFORMATION PURPOSES ONLY AND IS CONCEPTUAL. THIS IS SOLELY THE PHOTOGRAPHER'S SOLUTIONS INTERPRETATION OF THE PROPOSED DEVELOPMENT 3 0 2L, '4 'V, 0 7 �T t 0. > Existing 0 APPROX. PHOTO m 0 OZ o oMobfle'- LOCATION 0 APPROX. PROPOSED EDMONDS PKWY ANTENNA LOCATIONS Looking Southeast (3) (N) T-MOBILE PANEL ANTENNAS & (3) (N) FRLB RRUS M UNTIED TO (E) 93.1'AGL WOOD UTILITY POLE -SEE NOTES Proposed NOTES: 1. PWGC TO VERIFY PAINTING REQUIREMENTS WITH JURISDICTION PRIOR TO ORDERING SUPPORT STRUCTURES, u r,4 L_o n -,-T- 0 r--n ATTACHMENTS. ANTENNAS, AND OTHER APPURTENANCES. *CENTERLINE 2. VISUAL IMPACTS WILL BE AFFECTED BY LOCATION AND VISIBILITY OF OBSERVER. THIS DOCUMENT IS FOR PLANNING AND INFORMATION PURPOSES ONLYAND IS CONCEPTUAL. THIS IS SOLELY THE PHOTOGRAPHER'S SOLUTIONS INTERPRETATION OF THE PROPOSED DEVELOPMENT El ­% Al —1 (E) ADJACENT PROPERTY LINE (TY'P) 1 1 OVERALL SITE PLAN 3: w x R�j T-MOE �EE (E) T-MOBILE U/G CONDUIT ROUTE; (4) 6"0 SHEET A4.0 CONDUITS W1 (6) RUNS OF 1-5/8"COAX, (1) HYBRID HI -CAP CABLE, (1) LMU BUNDLE, & (3) RET CABLES (300 LF) TO REMAIN —,70AX-- OA — — -- — -- — -- A7_� —COAX _---COAX HYBRID D� Hy Rjj� YB SR HYS 111) DRAWING LEGEND SU13JECT PROPERTY LINE ADJACENT PROPERTY LINE —COAX— COAX ROUTE HYBRID HYBRID CABLE ROUTE EXISTING FENCE ELEVATION MARKER DETAIL REFERENCE SECTION MARKER COMMON ABBREVIATIONS (E) EXISTING (N) NEW ABBREVIATIONS CONTINUED (TYP) TYPICAL ON SHEET GN1.0 NOTE: SITE PLAN DERIVED FROM; EXISTING DRAWINGS, GIS, AERIAL IMAGES AND SITE PHOTOS. T-MOBILE PROJECT AREA PARCEL #: 00373600700901 1000� SEE SHEET A2.0 'X (E) OTHER CARRIER EQUIP. ROOM ECT Zone R-5 Comer Flag (E) SUBJ PROPERTY LI E (TYP) Setbacka B�Ieguired Ag.jua.1 INGRESS/EGRESS Front FROM 96TH AVE W Sides APPROVED BY, PLANNIN Rear (E) LINE OF T REE CANOPY I ENGINE�?' " III fell T - -Mobile.. CASCADIA' PM Precision Program Management *CENTERLINE SOLUTIONS AdVanCing wwe&.z Net"04y WAS 5 108/18/2015 rCPM —PROJECT NO.: 8907 PREUMINARY fRO=EATE I D/C I DESCRIPTION =06-24-15 1JG/MS1 CLIENT COMMENT "4 0 1;2�""! CLIENT COMMENT EZr SUBMITTAL NOI DATE I DIC 1 DE§251PTION 150§;21- TO 6_ P SUBMITTAL 1 8_,8_151 '3 S, MS! CLIENT COMMENT t I I SITE NAME: EDMONDSPKWY/ SNOPUD/HECOX SITE ID: SE01575A SITE ADDRESS: 21909 96TH AVE W EDMONDS. WA 98020 D ate: SHEET TITLE 16.2- OVERALL STREET Fi,LE TN MN SITE PLAN SHEETNO. S 0 OCT K' 3 2015 SCALE: 1 30'-0 (11 X1 7) 1 0. 15' 30' 60' A go m n1NM ri L B—DEPARe-MENT SCALE: I" 15'-O"(22X34) CITY OF E NDS Nalp 1 M�� m (-f - coib 70 15 (A 40 i LANE CLOS. (TWO hA6: W20-1 W20-4 AD Z, W20-7A<T- . Z�- 00 04 N, NORTH G20-2AF' ( Rw �wqxj (OPTIONAL) �URE ON 9 FLAGGER OPEF c 0 0 -3: 02 Lli ol , > 0� 0 0 0) 0 0 r 6TH AVE W !ATION) G20-:2A (OPTIONAL) Qf A mi* SPEED 'LIMIT IIIN ( IG P�CIN Al I IF T) BUFFER (FT) 200 55 30 200 85-- 35 350 12G 40 350 .170 45 .500 220 50 500 1 280 55 500 1 335 W20-7A ONE�LpiE .�.pkq, W20-4 AHEAD 0 ROAD wbf!� W20-1 AHEAD ENGINEERING DIVISION A P V 0 S NOT D DaW f SNOHOMISH COUN7Y. I u- [MMO TRAFFIC CONTROL PLAN lY DISIRIMM I/ Awimamr.. PROJECT _T-MOBILE EDMONDS PARKWAY LTE MOD f 1 16 LdCATION 21909 96TH AVE W EDMONDS 98020 fitt -H ENGINEER ANDERS DAHL DATE 7/15/2015 WO NO 100000271 — PHONE 425-783-4342 c .01 T? 'o c: 0 co 0 0 to L) 0 ), I 0 ,�,uj 0 PLANNING DATA street SINGLE FAMILY RESIDENTIAL Name: -f-MD10ije- I TI'M -HP-COX RevIeWDate: 013.1S.,poocl SiteAddress: /l/19ID9 Cl(olli AVC-\A/ Permit Number: /1/()Dg . 0 7 �-7 Project Description: 11 x 1+ e-9LAipVnCV1f- GhClter f- addf-ftor) of .3 pavl?A avitenna6 ovi re-plciceci Pup pole, Zoning: P-6 —5 1 Comp Plan: Corner'l-0t: (YES is Flag Lot: (YES /0 ]:VEaiance: mall Site Plan: Oe NO) ADU Created: (YES 60) LLA: CUP: r Shoreline: Subdivision/Legal/Recording Number: Legal Nonconforming Land use Determination Issued: (YES Critical Areas Determination P-A- , W 01 - 0 0 7-5' Study Required waiver SEPA Determination: tyfMP4 —kxh1itje"2 ReqUired SetbOCkS Street: cl-t- \N e, 1-9 Side: 0 0 rl-�l 7.6 1 Side: 1 15 D Ut�j Rear: tA t;t ActualSetbacks Street- \N P- j�- — 11 �5 Side: 5D+ Side: � -;E)Qt�l (31 Rear. -P,61 ei F) 60 �DetaCh�edStructure�s 9 ReeI(erieG.'Retafl9W0-Wsft 0 FeAeeSoq-F�- �rs Bay-U4ROowsA2Fejeet-tng-Modataftn e >-391&taws 9 Geveped-geek4lPar-GM >-3eLE-aves CZWAneW�ce * wigeeveFe"ReRc-4esed-.*-3GL9@GKA2Q=WP-aW Parking Required: 2 Parking Provided: ,?, NIC, I coverage Required: 35% Coverage Provided: I i — Lot Area: Lot Coverage Calculations: BUIlding Height Datum Point: Datum Elevation: MaXiMUM Height: Actual Height: -nVei, . comniLAn i ty m -e f--h . n3 requiv-ed he14 1011L+ .571 pvuve, " Vvi 1,("VD V1 t Of VDIC- EP a OA le-1— I aM A Cy t, t4,F f V-1 A-P Plan Review BW: Gina Coccla, ASsoclate Planner a M I't VV — -f-A (A. 11, ty " REGARDING: 21909 96th Avenue West 42,5- --6 Q 6,S6 (address) R E C 0 R D 0 F C 0 N T A C T S DATE NAME, PHONE NO., & COMMENTS ADDRESS of CALLER 4/4/77 Willian Hecox Certified Letter No. 406814 sent requiring hook-up by 7/1/77. CON-NECTUN: COMPLETED: 5-2:3-77 COE ACTION TAKEN Letter received. INITIALS JT CITY of EDMONDS 200 Dayton Street - Edmonds, Washington 98020 - Telephone (206) 775-2525 Department of Public Works CERTIFIED MAIL4aod/ Mr. or Mrs. William J. Hecox 21909 96th Avenue West Edmonds, Washington 98020 Dear Mr. or Mrs. Hecox: April 4, 1977 Following a petition by a majority of the residents in your neigh- borhood, the City Council of Edmonds accepted the annexation in- corporating your property, located at 21909 96th Avenue West, within the City limits. Officially, the annexation became effective November 6, 1976. The City has now transferred accounts from the Alderwood Water District to the Edmonds water system. Billing has been converted to the Edmonds water rate and utility fee. The major motivation for annexing to the City was to obtain avail- ability for sewer hookups. Our records indicate that your property abuts an existing sewer main and you are, therefore, required to make connection. City Ordinance normally requires connection within 60 days. However, on annexation we allow for inclement weather con- ditions and additional time for the home owners to make necessary arrangements. We are establishing a date of July 1, 1977, as the time in which you must have your'residence connected to sewers. Requirements for obtaining a Side -Sewer Permit are as follows: 1. Payment of connection fee. Please bring the legal description of your property to the Public Works De- partment prior to your request for a Permit so that the connection fee can be computed. 2. Payment of $35 Permit fee. 3. Copies of all recorded easements (where applicable). 4. A plot -plan drawing of the proposed connection. Side -Sewer Permits may be obtained at the Public Works Department, 200 Dayton Street, Edmonds, between the hours of 8:00 a.m. and 5:00 p.m., Monday through Friday. Please phone Mr. John B. Mitchell, Water Sewer Superintendent, at 775-2525, extension 226, for any information or assistance you may desire. Yo V' ru LEIF LARSON, P.E. Direct r of Public Works J BM: RHA: j t RECEIPT FOR CERTIFIED MAIL-30� (plus postage) SENT TO POSTMARK Mr. or Mrs. William J. Hecox OR DATE STREET AND NO. 21909 96th Avenue West 0 P.O., STATE AND ZIP CODE \� 'p Edmonds, \ . �) _yashington 98020 (9 CD OPTIONAL SERVICES FO F!E—S— R ADDITIONAL 1. �:E !: RETURN N 1. Shows to whom,and date d Ii r RECEIPT With delivery to a dres a n S4 hows to whom, date and w e Ve SERVICES With delivery to addres e 11 1 I y it DELIVER TU ADDRETSEE ONLy WtUIAL UELIVERY (extra fee required) . . . . . . . . . . . . .4 PS'Form NO INSURANCE COVERAGE PROVIDED — A 3800 (See other side) p . 1971 NOT FOR INTERNATIONAL MAIL GPO: 1070 0-307.4tiO o �Ln "'n' co, T 0. 0, cn, :"En:­0 in rn 0! �Z' ic:>� —0 1 4::j Z C, .0 0 ro U), .7 '01 m "a 41 A S Im, cd T < !Hj'.(a)t 44 to 0 � :� , 4-:� t ca , Q W cr c .0 0 �94 -HI co" a) :< cd >- 4, W, il i . Z 0 9! W, bm Z 0. �0' W, L) be �4' 4L) a., > -j E W '0 > "O"N" 'rn Q -0; z w, W" a 0' Q 70 0 0' W 0 '0) "W. r4 LU,' >i W"; Y ' W, X 'X W W 7" z S �4 or — z z 5, < t:t4.W't<-0 �111' QW: NOTICE:* 71 r N the attached The information shown on tY 01 piled for use by the C1 map(s) was coM ' Edmonds/ its Empl-oyees and Consultants. nt the Th,e C ty of 'Edmonds does. not warra on these accuracy of anything set for.th M a p ('s"'). A n . y person or entity -requesting a copy should conduct an independent 1nfbrrn'ation shown-c Inquiry regarding the tT�e -m a p (S) / including, but not i'mited to, -er stub shown. SU( the location of any sew sewer stubs may or may' not e.xist and ma�, may not exist at the location shown. or r-ity of Edmond-s nor its Neitheir the 11� ic er s *s h- a I. I b e 11 a. b-1--e f o r t- h empjoyee-s o-r off* information given on thi5 map(s), nor for e-ntation provided based 3ny one repres upon said. m a p (S' APPLICATION i. The eity of Edmonds for SIDE SEWER PERMIT EASEMENT NO - ------------------ ------------------------- NEW CONSTRUCTION REPAIRS F� LID NO - ------------------ ASMT. NO - ------------------ OWNER------------------------------------------------------------------------------------------------ CONTRACTOR ..................... ----------------------------- -- ------- PERMIT NO - -------------------- JOB ADDRESS ---- ---------------------------------------------------------------------------------- LEGAL DESCRIPTION: LOT NO - -------------------------------------- BLOCK NO - ------------------------------------ NAMEOF ADDITION ---- L�7 - ---------------------------------------------------------------- ---------------------------------- -tz-y- ---\ I`Y\C�..% N--3 ----) j J-41 IV= '," E-7�---r - ZI - - --- I -- - ��J CO 00 L?l TF4 lEl Approved - DATE ... . ..... ..... . .. .. .. By.. X, 1! E r WO 4 4� EUT "OF MER, PERM Wk -SEWER DEP TEMs Tr P 'MIT ER 5788 ,(,,CiII: for, side sewer BEFORE covering:, -Any portion - of. the constructl inspection Will be_provIded withf� 24 hours after requst. ��NOI`Sat., Sun., or holiday Inspection d �-�,kDD.RESS!�L'OUAUONi*OF.,,CONSTRUCT.IoN ...... 219.99 .... 9.�th Aveime Wes-t . ........................................................... 7- ........................................................................ --�,P-ROI�'ERT-Y..�LEG!NLI?,DESCRIIPTION. The S-14' of the U. .6871. of Lot 9, Blodk 7, ..................................................... ....... .................................................... ..�­ ........... ...... ........ ............................................... ...... 9 ... . ..... .. ............................................ ........ TT,!'!A !.R �QQX .............................................. .................... 0 "1 ER ANDVOR BUI IMER...�.N ..... ....... .................. . . ......... ............................. ADDR19SS ........... L. J�.-Roth,Cbnst. ............. ; .................. ........................................................... ......................... .................................................... _�4av 13. onjsl�,glrante& .......... ............................................... for repair and/or, connection of a side sewer to, the city sanit�ary sewer tem ih-accoTd'a'ja'pptwiW,Clty, of; Edmonds, ordinances. ATTI@KTION.*.Ii�-di��i6i�';,.i�'6�.TH-E FOLLOWING' NOTE'No� 1--�-The�`,6wfieri��, of'�'the,'�property rnay obtain- a permit to construct I sewer Inside, property, line. A 116ensed'�Side Sewer Contractor must be employed. to construct street; area. Dol not cover any, portion of sewer -before it has been, Inspected. NOTE No; 2=A1I�WdrW.,,p�iforrne& Lin city' right-of-way requires an Invasion of Right -of -Way Permit obtkin�able from the City *Engineer's office. N9TE� No., .3-01�ia(�, fuII,`,infci,rmaiion, regaxding, -Ordinance 1T. 16.030 and' Regulations governing side -sewers�' hen you get permit. w NOTE No. 4—Top,,AfTlslde�,sewer,must have at least 30 inches coverage at property line' and 12 inches Inal It I I .. de property line; minimum grade,of 2%. No bends� In grade han'lh� will,.be permitted NOTE':No:r Tren t- mustbe, water settled and surfiLee of'street, restored, to original,,c6ndit ion., . Contractors sba M be resp;onsible, for I failure due A o. ': i r develbp, withl n,,one year of completion. -0 OTE No.' I other work,,tha'n' Is, provldcd� for in permit, or.'to do,any work,.on the, main sewer'or Its appurtenances except to. in.. ithevWxe;. ....... ell DISAPPROVED; at . ... ............ — .......... BY, Date .......... . BY Date ... * .................................. By .................. ..... ................ AIPPROVEW ............... . ......... ]BY ........ A.".-i ...... ......................................... .............................. . .. ...... ....... ........................ Remarks:;: M'..." ........................................... .............. V ... ........................... 7­­,-,-- W .. .......... .............................................................................. ........... ........... ......................................................................... 4 Permii',Ij6pies, MU B ST e. Signed By Owner of Firm Performing Construction'PRIOR To Request For Inspection t�........................................................... : ............... .. hereby certify that. the side sewer installation, constructed underthis -permit ner o Contracting Firm Performing Construction) wasInstalled'i n, ace, a.nce with� allgoverning, ordinances of the city�,.of'Edmonds. Dated, this ............................ day of ................. ........ ............. ................ 19 ......... C�6ck,-BEF61LE, you dig for: Water E]; Gas-E], Telephone� Ej, Power- E], Sewer' 'F Other E] V, %/ APPUCATION 7hp,-,City of Edmonds for EASEMENT NO - -------------------------------------------- SIDE SEWER PERMff NEW CONSTRUCTION REPAIRS E] LID NO. - --------------- ASMT. NO. ................. OVNE CONTRACTOR -------- ------------------ 4--�y . ............. ----------------------------------------- PERMIT No., R JOB ADDRESS ------- �'w ---------------------------------------------------- LEGAL DESCRIPTION: LOT NO - ------------------------- ------------ BLOCK NO. - --------------------------------- ....................................................... -------------------------------------------------------- ............. ...................... NAME OF ADDITION ----------- Approved: DATE............................................ By --------------------------------------------------- i7i7ig Date --hp 11 7, 1977 22�o Memo to: Dix.ccLor of Maintenance (verati.on Public Works From: City Engineer - Assistant Subject: Sewer Connection Charges Legal Description: The south 74 feet of the north 687 feet of lot 9, block 7, Plat of Alderwood Manor No. 91, as recorded in records of Snohomish County, Washington Commonly known as: 21909 96th Avenue W. Owner: William J. Hecox Z.F.F. Calculation: (85.2S Z-F-F- x �5.50/Z.F.F.= Lateral X Unit x $25 CC: owner $ 468.88 Copnection Fee $ Lateral Charge $ 2S.00 Trunk Charge $ 10.00 Permit 503.88 TOTAL Assistant.City Engineer 2108