RF Safety and NIER Analysis Report
7/27/2015
Site: SE01575A
Prepared for: T-Mobile
SEP 112015
DEVELOPMENT SERVICES
COUNTER
v N I = TIA �,
Prepared for: T-Mobile, Site: SE01575A
Table of Contents
Certification.................................................................................................................... 3
Executive Summary ........................................................................................................ 4
Introduction..................................................................................................................... 6
SiteDetails ...................................................................................................................... 6
Predictive Analysis Details ............................................................................................... 8
Conclusions and Recommendations ............................................................................... I I
Appendix A: FCC Compliance and RF Safety Policies .................................................. 12
Appendix B: Overview of RoofView@ Functions and Assumptions .............................. 14
References..................................................................................................................... 16
LimitedWarranty ........................................................................................................... 16
Centerline Solutions, Inc. Proprietary and Confidential Page 2 of 16
Prepared for: T-Mobile, Site: SEO I 575A
Certification
This report, prepared by Centerline Solutions, LCC for T-Mobile, is intended to
document compliance and evaluate power density levels as outlined in the report. The
comput ' ations,'analysis, and resulting report and conclusions were based on applicable
FCC guidelines and regulations for maximum permissible exposure to humans consistent
with FCC OET Bulletin 65, Edition 97-01.
Additionally, Centerline Solutions, LCC certifies that the assumptions are valid and that
the data used within Centerline Solutions' control are accurate, including information
collected as part of Centerline Solutions' field surveys. Centerline Solutions, LCC does
not however certify the accuracy or correctness of any data provided to Centerline
Solutions, LCC for this analysis and report by T-Mobile or other third parties working on
behalf of T-Mobile.
I certify that the attached RF environmental analysis and report is correct to the best of
my knowledge, and all calculations, assumptions and conclusions are based on generally
acceptable engineering practices:
John C. Keating, P.E.
July 27 1h 2015
Centerline Solutions, Inc. Proprietary and Confidential Page 3 of 16
Prepared for: T-Mobile, Site: SE01575A
Executive Summary
This report provides the results of an RF power density analysis performed on T-
Mobile's utility pole site SE01 575A.
Current Site Confizuration:
The Site's current configuration is as follows: Three sector site operating with technology
including GSM in PCS band (1900 MHz), UNITS in PCS band (1900 MHz), and UMTS*
in AWS band (2 100 MHz).
Proposed Site Configuration:
The Site's proposed upgrade is as follows: Installation and operation of additional LTE
technology, Long Term Evolution (LTE) in the 700 and 2100 MHz bands. UNITS in the
AWS band (2100 MHz band) will be removed.
The proposed physical modifications will result in replacement of radio hardware and
antennas at this site.
Site Description:
Site Type and Height- Utility Pole, elevation of 93. V
Equipment Location- Adjacent to the utility pole, inside a shelter.
Other Antennas- This is a T_-Mobile only site that does not host 'any other
antennas.
Access- Access to the utility pole is open to the general public, the equipment is
inside a locked shelter.
Study Reference Location- This study examines the power density environment at
ground and rooftop level from ALL sources of RF. -
Existing Signage- There is blue RF signage at the base of the utility pole.
RF Environment- Since the area on the ground and the adjacent rooftops is open
to general public, for purposes of evaluating compliance with FCC OET Bulletin
65, the area is determined as a General Public environment.,
AnalyaLis:
The analysis of the RF power density at this site indicates that emissions on the rooftop of
adjacent buildings will not exceed the FCC's Maximum Permissible Exposure (MPE)
limit for general/public environments. Ground level exposure is calculated to be less than
5% of the FCC MPE limit for general public environments. No further mitigation is
required.
Centerline Solutions, Inc. Proprietary and Confidential Page 4 of 16
Prepared for: T-Mobile, Site: SE01575A
Conclusion and Recommendations:
0 The results of the analysis indicate that the power density levels at ground and rooftop
of the, nearby buildings will not exceed FCC MPE limit with the proposed antenna plan.
- The risk of accidental exposure from these antennas is being mitigated by an RF alert
sign placed at the base of the utility pole which is visible upon approaching to it.
- This site will be operating in general compliance with FCC OET Bulletin 65 following
the implementation of the changes outlined in this report. No further mitigation is
required.
Centerline Solutions, Inc. Proprietary and Confidential Page 5 of 16
Prepared for: T-Mobile, Site: SE01575A
Introduction
The purpose of this analysis and report is to evaluate the cumulative power density levels
of all antennas located on the utility pole and identify any areas of concern that require
mitigation. This report also assesses the site's compliance with FCC OET Bulletin 65;
"Guidelines for Human Exposure to Radio -frequency Electromagnetic Fields".
As part of this analysis, the site was visited on 3/23/2015, to perform a complete field
survey. The purpose of the survey was to verify antennas located on the utility pole and
identify co -located wireless facilities.
The power density simulation performed for this site utilized Roofviewo analysis
software. All antennas were assigned an operating frequency and transmit power and
were deemed to be operating at 100% of their rated output power.
Site Details
Address: 2190996 1h Ave W
Seattle, WA 98020
Site type: Utility Pole
Height: — 93. V
The photographs on the following pages show a view of the existing antennas on the
utility pole and RF signage that is present.
Centerline Solutions, Inc. Proprietary and Confidential Page 6 of 16
Prepared for: T-Mobile, Site: SEO I 575A
Exhibit I- Photos
Centerline Solutions, Inc. Proprietary and Confidential Page 7 of 16
Prepared for: T-Mobile, Site: SEO I 575A
Antenna Invento!y.
The following table contains the technical data used to simulate the power density that
may be encountered with all antennas simultaneously operating at full rated power.
TMAIA G1900 1950 40
2 0.5
71.30007505 Commkope SBNHH-ID65A
TMAIS U1900 1950 30
2 0.5
53.47505629 CommScape SBNHH-1065A
TMAIC L2100 2150 120
1 0.5
106.9501126 CommScope S8NHH-ID65A
TMAID L700 730 60
1 0.5
53.47505629 Commkope SBNHH-ID65A
TM82A G1900 1950 40
2 0.5
71.30007505 CommScope SBNHH-ID65A
TM828 U1900 19SO 30
2 O.S
53.47505629 Commkope SBNHH-ID6SA
TMI32C L2 100 2150 120
1 0.5
106.9501126 Commkope SBNHH-ID65A
TMB2D L700 730 60
1 0.5
53.47505629 CommScape SBNHH-1065A
TMC3A G1900 1950 40
2 0.5
71.30007505 Commkope SBNHH-1065A
TMOB U1900 1950 30
2 0.5
53.47505629 Commkope SONHH-1065A
TMC3C L2100 2150 120
1 0.5
106.9S01126 Commkope SBNHH-ID6SA
TMC30 L700 730 60
1 0.5
53.475 629 Comm5co SBNHH-ID65A
73.5
88.5
Hexport
4.633333333
14.75
6530
73.5
88.5
Hexiaort
4.633333333
14.75
65;10
73.5
$8.5
Hexpon
4.633333333
14.9S
62;10
73.5
88.5
Hexpon
4.633333333
11.45
66;10
73.5
88.5
Hexpon
4.633333333
14.75
65;250
73.5
88.5
Hexport
4.633333333
14.7S
65;250
73.S
98.5
Hexport
4.633333333
24.95
62;ISO
73.5
88.5
Hexport
4.633333333
11.45
66;ISO
73.5
88.5
Hexport
4.633333333
14.75
65;260
73.5
88.5
Hexpon
4.633333333
14.75
65;260
73.S
88.S
Hexpon
4.633333333
14.95
62;260
13-5 -
Hexpon
4.633333333
IIAS
66;260
Exhibit 2- Antenna details
Predictive Analysis Details
For purposes of this analysis, RoofView@ was configured to provide an output based on
the appropriate MPE limit(s) published in the FCC's guidelines. The antenna information
was loaded into RoofView@, an MPE predictive analysis tool by Richard Tell and
Associates. The analysis was run for both the ground and rooftop levels.
The map in Exhibit 3-1 is a graphical representation of the predictive emissions on the
ground. The map in Exhibit 3-2 is a graphical representation of the predictive emissions
at rooftop of the nearby buildings. The solid green shading indicates that power density
levels are expected to be less than 5% of the applicable maximum permissible exposure
(MPE) level in these areas. Other colors are defined in the legend.
Centerline Solutions, Inc. Proprietary and Confidential Page 8 of 16
Prepared fior: T-Mobile, Site: SE01575A
Green <= 5% General Public Limit* Muc <-- 20% General Public Limit
<= 100% General Public Limit Red > 100% General Public Limit *
Exhibit 3-1 (Ground - I.ayout) (Not to scale)
Page 9 of 16
Prepared for: T-Mobile, Site: SE01575A
Green.<= 5% General Public Limit* Blue 20% General Public Limit
<= 100% General Public Limit Red > 100% General Public Limit
Exhibit 3-2 (Rooftop - Layout) (Not to scale)
Page 10 of 16
Prepared for: T-Mobile, Site: SEO I 575A
Conclusions and Recommendations
- The results of the analysis indicate that the power density levels at ground and rooftop
of the nearby buildings will not exceed FCC MPE limit with the proposed antenna plan.
- The risk of accidental exposure from these antennas is being mitigated by an RF alert
sign placed at the base of the utility pole which is visible upon approaching to it.
- This site will be operating in general compliance with FCC OET Bulletin 65 following
the implementation of the changes outlined in this report. No further mitigation is
required.
Note: Modifications to the site; andlor increases in channel counis or nower levels exceedinz those listed
in this revorl vvifl Muire additional evahiation io determine compliance.
Page I I of 16
Prepared for: T-Mobile, S ite: S EO 15 7 5 A
Appendix A: FCC Compliance and RF Safety Policies
In August of 1997, the FCC published OET Bulletin 65 Edition 97-01 to regulate
methods for evaluating compliance with FCC guidelines for human exposure to
radiofrequency (RF) electromagnetic fields. The FCC guidelines for human exposure to
RF electromagnetic fields incorporate two categories of limits; namely "Controlled"
(a.k.a. Occupational) and "Uncontrolled" (a.k.a. General Public). The guidelines offer
suggested methods for evaluating fixed RF transmitters to insure that the controlled and
uncontrolled limits deemed safe by the FC for human exposure are not exceeded.
OET Bulletin 65 recommended guidelines are intended to allow an applicant to "make a
reasonably quick determination as to whether a proposed facility is in compliance with
the limits." In addition, the guidelines offer alternate supplementary considerations and
procedures such as field measurements and more detailed analysis that should be used for
multiple emitter situations.
These guidelines define RF as emissions in the frequency range of 300 kHz to 100 GHz.
The FCC define Maximum Permissible Exposure (MPE) limits within this frequency
range based on limits recommended by the National Council on Radiation Protection and
Measurement, the Institute of.Electrical and Electronics Engineers, LCC. (IEEE), and by
the American National Standards Institute (ANSI).
The specific MPE limits defined by the FCC are as follows:
Frequency
Range [MHz]
0.3-3.0
3.0-30
30-300
300-1,500
11,500 - 100,000
Range [MHz]
0.3-3.0
3.0-30
30-300
300-1,500
1,500 - 100,000
f = freauencv
Electric Field
Strength (E) [Vim]
614
1842/f
61.4
Electric Field
Strength (E) [Vim]
614
842/f
27.5
Magnetic Field
Strength (H) [Alm)
1.63
4.89/f
0.163
Magnetic Field
Strength (H) [Alm]
1.63
2.19/f
0.073
oiled Exposure
Power Density
(S) [MW/CMA 2]
100*
goo/fA 2*
1
f/300
5
Power Density
(S) IMW/CMA 21
100*
1 80/fA2*
0.2
f/1500
1
power
Averaging Time JEJA 2,
JHJA 2 or S [minutes)
6
6
6
6
6
re
Averaging Time JEJA 2,
JHJA 2 or S [minutes)
30
30
30
30
30
The FCC states that "Occupational/Controlled limits apply in situations in which persons
are exposed as a consequence of their employment provided those persons are fully
aware of the potential for exposure and can exercise control over their exposure. Limits
for occupational/controlled exposure also apply in situations when an individual is
transient through a location where occupational/controlled limits apply provided he or
she is made aware of the potential for exposure."
Page 12 of 16
Prepared for: T-Mobile, Site: SEO I 575A
For General Population/Uncontrolled limits, the FCC states that "General
populatibn/uncontrolled exposures apply in situations in which the general public may be
exposed, or in which persons that are exposed as a consequence of their employment may
not fully be aware of the potential for exposure or cannot exercise control over their
exposure."
For purposes of this analysis, all limits are evaluated against the Power Density limits.
Typical guidelines for determining whether occupational/controlled limits can be applied
include insuring the environment (such as a rooftop) as limited/controlled access via
locked doors or physical barrier that are preferably controlled by a landlord that is aware
of the situation and can inform anyone going through the locked door of the. existence of
the RF emissions. Such notification/awareness is typically accomplished by means of
signage on the door, or other access to the area of concern, as well as signage on or near
the antennas. Examples of such signs include the following:
Radio frequency flelds beyond
this point nuly exceed dle FCC
general public exposure llffdt
Ob.y.9 posud V- and ft 9.&MIne.
for vvodilng In rano Inequency
ACAUTION
Beyond this point:
Radio frequency fields at Us site
may exceed FCC rules for human
exposum
SM Veto nftfl; on" 0 PQMd SWO and
.". O.M.4— f. -oldng In ft
hequencyenvironawft.
Beyond this point:
Radio frequency fields at this site
exomid the FCC rules for hunwan
exposure.
F.9— to oby in pobd " .0 sft
guld*11nol In, vAwWng In rodia frequency
w-bannuents could nmW In wbus lnjury�
Standards for when to use each of the above signs for occupational situations are as
follows:
No sign required: <20% of Occupational MPE
Blue Sign, Notice: 20% to <100% of MPE
Yellow Sign, Caution: 100% to <1000% of MPE
Red Sign, Warning: >1000% of MPE
All MPE references are to the FCC Occupational limits.
Page 13 of 16
Prepared for: T-Mobile, Site: SE01575A
Appendix B: Overview of RoofView@ Functions and
Assumptions
RoofView@ is a tool develope'd and supported by Richard Tell Associates, LCC. to be
used for analysis of RF field levels at telecommunications sites produced by antennas of
the type commonly used in cellular, paging, SMR, PCS and two-way radio
communications services. Although its name suggests that the tool is only for use in
evaluating emissions for roof top applications, it can also be used to evaluate ground
level effects of tower facilities.
RoofView@ allows the user to apply near field, far field, or a combination of near and far
field computational methods as desired by the user. For this analysis, near field
computations are used for areas within the near field, and far field computations are used
beyond the near field. Specific break points are dynamic based on the aperture of the
antenna being analyzed.
The near field methodology is based on a cylindrical model that assumes the power into
an antenna is distributed as a cylinder�around the aperture of the antenna. Research by
Richard Tell Associates, LCC. found that using such a model, along with corrections for
height and antenna pattern, is very accurate, if not slightly conservative in estimating RF
exposure. FCC Bulletin 65 recognizes the use of the cylindrical model for near field
calculations. The following picture
computations used by RoofView@ on a
used:
T
III
i
and corresponding equation summarizes the
bin -by -bin basis when the near field method is
. S 360 P
0 BW 2nRh
7 3 dB Beam
(deg rees) - 0 BW
Each bin's results are then also adjusted by spatially averaging the portion of a 6 foot tall
human that intercepts the aperture over 6 feet. Once the antenna is completely above (or
below) the height that corresponds to a 6 foot tall human, the cylindrical results are
Page 14 of 16
Prepared for: T-Mobile, Site: SEO 15 75A
reduced to 10% of their results and then dissipated inversely in proportion to the square
of the distance.
Once bins being analyzed fall outside of the near field (as determined by a method and
variable that is user -selectable; see below for method and variable used in this analysis), a
far -field spatial average is calculated. Spatially averaged power density in the far -field is
calculated by reducing the spatially averaged power density inversely, by the square of
the distance from the antenna(s).
There are several input variables to RoofView@ that can impact the results produced
when evaluating specific cell sites. Those variables are summarized accordingly:
Required Inputs for RoofView@ v4.15 Analysis
Thresholds Relative to Controlled Limits)
>= 0% < 5%
>= 5% < 20%
>= 20% Y ow < 100%
>= 100%
Standard
FCC 1997 Occupational (default)
FCC 1997 General Population (as applicable)
Model
Near/Far Spatial Average
Uptime
100% (vary as applicable)
Near/Far Field Transition Method
X ApHt
Near/Far Field Transition At Ht Factor
1.5
Page 15 of 16
Prepared for: T-Mobile, Site: SE01575A
References
FCC (1997). "Evaluating Compliance with FCC Guidelines for Human Exposure to
Radiofrequency Electromagnetic Fields"; Federal Communications Commission; Office
of Engineering and Technology, OET Bulletin 65, Edition 97-01, August.
Richard Tetl Associates, LCC. (2003). RoofView@ User Guide Version 4.15, Richard
Tell Associates, LCC., February 10, 2003.
Limited Warranty
Centerline Solutions, LCC. warrants that this analysis was performed in good faith using
the methodologies and assumptions covered in this report and that data used for the
analysis and report were obtained by Centerline Solutions, LCC. employees or
representatives via site surveys or research of T-Mobile's available information. In the
event that specific third party details were not available, best efforts were made to use
assumptions that are based on industry experience of various carriers' standards without
violating any confidential information obtained under non-disclosureterms.
Centerline Solutions, LCC. also warrants that this analysis was performed in accordance
with industry acceptable standards and methods.
There are no other warranties, express or implied, including but not limited to, the
implied warranties of merchantability and fitness for a particular purpose, relating to this
agreement or to the services rendered by Centerline Solutions hereunder. In no event
shall Centerline Solutions be held liable to T-Mobile, or to any third party, for any
indirect, special, incidental, or consequential damages, including but not limited to loss of
profits, loss of data, loss of good will, and increased expenses. In no event shall
Centerline Solutions be liable t6 T-Mobile for damages, whether based in contract, tort,
negligence, strict liability, or otherwise, exceeding the amount payable hereunder for the
services giving rise to such liability.
Page 16 of 16
Y ECTO
E
n G I n E E R S
ProjectNumber: U1194-802-151
October 20, 2015
Cascadia PM, LLC
3320 South Bay Road NE
Olympia, WA 98506
ATTENTION: Bryan Underhill
STREETFILE
RESUB
OCT 2 8 2015
DEPAR-ITMENT
SU'Ll)y'NOOF
C,T EMAONDS
REFERENCE: SE01575A— Edmonds Pkwy/SNOPUD/ HECOX
21909 96" Ave W — Edmonds, WA 98020
Structural Mount Analysis for Proposed Antenna and Equipment Installation
Dear Bryan,
Per your request, we have reviewed the construction drawings prepared by your office for the proposed removal of
(3) existing panel antennas and (3) existing tower mounted amplifiers and the addition of (3) new panel antennas
and (3) new remote radio units, attached to an existing monopole. Each of the (3) panel antennas is attached to a
crossover plate on an 8" standoff arm mounted to a universal ring mount installed at the top of the pole; similarly,
the RRUs are mounted with 8" standoff arms to a second universal ring mount a few feet below the top of the pole.
In addition to reviewing the proposed construction drawings, we have reviewed as -built construction drawings of the
existing antenna configuration prepared by B.J. Thomas, P.E. (Dated: October 5, 2012) and site walk photographs
(no time stamp) of the existing antenna mount assembly provided to us by your office. Please be advised as follows:
Based upon our calculations and review of the documents noted above, we conclude that the antenna mount
assembly, as detailed on construction drawings, is adequate to support the loads associated with the proposed
antennas and equipment. Supporting calculations for the gravity and lateral loading on the proposed antennas
and Valmont structural analysis letters verifying the capacity of the existing universal ring mount (Valmont
part#: LWRM) and 8" standoff arm (Valmont part#: MMO 1) are attached.
The recommendations above are provided based upon calculations prepared by our office and information the client
provided. A representative from Vector has not visited the site. The analysis and conclusions described above are
limited to the members included in this report only and are based on the assumption that the structure was properly
designed and constructed. Analysis of the capacity of the existing monopole and foundation are not included in our
scope and are to be completed by others prior to modification of the loading configuration. Vector Structural
Engineering makes no claim as to the correctness of the original design or the current condition of the structure,
which is assumed to be in good condition, free of damage or deterioration. The contractor shall verify the suitability
of the existing mounts and the condition of the existing structure and shall notify Vector immediately should any
damage, deterioration or discrepancies between the as -built condition of the existing structure and the assumed
condition described in this report and on the construction drawings be found.
We hope this meets your needs. If you have any further questions regarding this matter, please call our office at
your convenience. ..., �'T. A L �w
Very truly yours,
VECTOR STRUCTU ENGINEERING
9AL EN G
Rode,rt Aeortg,' S.h 10/20/15
Principal
LICENSED ) I
PROFESSIONAL
ENGINEER
No. 11412-S
RTA/Irg EXP. 4-30-16
This work was prepared by me
Enclosures or under my supervision.
Construction of this project will
be under my observation.
9138 S. State St., Suite 101 / Sandy, UT 84070 / T (801) 990-1775 / F (801) 990-1776 / www.vectorse.com
Page 2 of 19
JOB NO.: U 1194-802-151 DESIGNED: LRG
ECTORDATE: 10/19/15 CHECKED:BDV
n 9 1 n L- r= R 8
PROJECT: SE01575A EDMONDS PKWY/SNOPUD/HECOX
Desi-aln Criteria:
Code: Structural design is based on the International Building Code, 2012 Edition
Wind: Basic wind speed = 110 mph (3-second gust) per the ASCE 7-10 standard
Risk category: 11
Wind exposure: C
Seismic: Seismic loads are based on the International Building Code, 2012 Edition
Seismic importance factor, I = 1
Risk category: 11
Mapped spectral response accelerations: Ss = 1.265g S, = 0.495g
Site class: D
Spectral response coefficients: SDS = 0.843g So, = 0.497g
Seismic design category: D
Basic se ism ic-force-res isti ng-system: Cantilever Element: Braced below its center of mass
Seismic response coefficient, Cs 0.338
Response modification factor, R 2.5
Analysis procedure: Equivalent lateral force
General Notes:
1 The contractor shall verify dimensions, conditions and elevations before starting work. The engineer shall be
notified immediately if any discrepancies are found.
2 The typical notes and details shall apply in all cases unless specifically detailed elsewhere. Where no detail is
shown, the construction shall be as shown for other similar work and as required by the building code.
3 These calculations are limited to the structural members shown in these calculations only.
4 The contractor shall be responsible for compliance with local construction safety orders. Approval of shop
drawings by the architect or structural engineer shall not be construed as accepting this responsibility.
5 All structural framing members shall be adequately shored and braced during erection and until full lateral and
vertical support is provided by adjoining members.
Structural Steel:
1 All structural steel code checks based on the AISC, 14th Edition per the ASCE 7 standard
2 All steel pipe to be per ASTM A53 GR. B (35 KSI), U.N.O.
3 All steel rectangular tubes (HSS) to be per ASTM A500 GR. B (46 KSI), U.N.O.
4 All other structural steel shapes & plates shall be per ASTM A36, U.N.O.
5 All bolts for steel -to -steel connections shall be per ASTM A325N, U.N.O.
6 All bolted connections shall be tightened per the "turn -of -nut" method as defined by AISC.
7 All steel surfaces shall be galvanized in accordance with ASTM Al 23 and ASTM Al 53 standards, thoroughly
coated with a rust inhibitive red oxide primer, or otherwise protected as noted on the structural drawings.
Page 3 of 19
JOB NO.: U 1194-802-151 DESIGNED: LRG
ETO DATE: 10/19/15 CHECKED: BDV
n a i n E E R S
PROJECT: SE01 575A EDMONDS PKWY/SNOPUD/HECOX SUBJECT: Enclosure Calculations
lComponents and Cladding Wind Calculations
Label: Wind Pressure
SITE -SPECIFIC WIND PARAMETERS:
Basic Wind Speed [mph]: 110
Exposure Category: C
ADDITIONAL INPUT & CALCULATIONS:
Note: Calculations per ASCE 7-10
Height of roof, h [ft]:
90.8
Comp/Cladding Location: Walls & Roofs
Enclosure Classification: Enclosed Buildings
GCP:
0.9
Figure 30.6-1
(enter largest abs. value)
a:
9.5
Table 26.9-1
Zg [ft]:
900
Table 26.9-1
Kh:
1.240
Table 30.3-1
Significant Topography?
No
-------- >
(Figure 26.8-1)
Kj:
Height of hill, H (ft]: a:
K2:
Length of hill, Lh [ft Y:
K3:
Dist to tower, x [ft]:
K,t:
1.000
Equation 26.8-1
Kd:
0.85
Table 26.6-1
Velocity Pressure, qh [PSfl:
32.65
Equation 30.3-1
GCpi:
0.18
Table 26.11-1
(largest abs. value)
OUTPUT:
Ultimate Pressure, p [psfl: 35.27 psf (1.0 Wind)
Allowable Pressure, p [psfl: 21.2 psf (0.6 Wind)
p -= qh IL—C [G C:PA,
KL, P:E
Page 4 of 19
JOB NO.: U 1194-802-151 DESIGNED: LRG
F=CTOR DATE: 10/19/2015 CHECKED: BDV
n G I n E=- E R S
PROJECT: SE01575A EDMONDS PKWY/SNOPUD/HECOX SUBJECT:LOADS
Label: One sector on upper ring
Antenna Equipment:
Point Loads Weight Front Side
Wind Forces
(11. )
Seismic Forces
(1.0)
Front load
Side load
Lateral
Vertical
Quantity
(Ibs) area (ft") area (ft')
(Ibs)
(lbs)
(Ibs)
(lbs)
SBNHH-1D65A
33.5
1
4.55
2.71
160
96
33.9
5.7
FRLB
59.5
1
0.65
1.72
23
61
60.2
10.0
Diplexer
7.9
4
0.39
0.14
14
5
8.0
1.3
Line Loads
Weight
(Ibs)
Length
(ft)
DiaorWidth
(in)
Weight
(plf)
Wind Forces
(1-0) (pif)**
Seismic Forces
(1-0) (pil)
2" STD Steel Pipe
20
1
5.5
1
2.38
1
3.65
1 1
0.0
4.2
3.7
0.6
1
Dead Load, D:
Total Weight of Components: WP lb
Wind Load, W:
Design Wind Pressure: p psf (1.0w)
Vtrans 237 lb 0-6 - Vtran, 142 lb
Viong 199 lb 0.6 * VI.n, 119 lb
Seismic Load, E:
Consider Seismic:
Occupancy Category:
11
F. =
1.0
Seismic Design Category:
D
F� =
1.5
1p
1.00
SMS �
1.265
Site Class:
D
Smi =
0.745
Rp =
2.5
SDS =
0.843
S. =
1.265
SDI =
0.497
S, =
0.495
a, =
0.7 - Fp,min
F---26 -Jib
Z=
ft
0.7 * Fp.max
lb
h =
ft
z/h
0.7 * Fp,trans
102 lb
0.7 * Fp,long
102 lb
F, lateral
1.012
F, vertical
0.169
0.7 * Fp,,.rt
lb
142 LBS <
532 LBS
<
1700 LBS
Controls over Seismic
Controls over Seismic
MM01 OK
LWRM OK
Page 5 of 19
JOB NO.: U 1194-802-151 DESIGNED: LRG
DATE: 10/19/2015 CHECKED: BDV
enein15-155IRS
YECTOR
PROJECT: SE01575A EDMONDS PKWY/SNOP1JD/HECOX SUBJECT: LOADS
Label:
One sector on lower ring
Antenna Equipment:
Point Loads Weight Front Side
Wind Forces
0. )
Seismic Forces
(1.0)
Front load
Side load
Lateral
Vertical
Quantity
(Ibs) area (112) area (ft')
(Ibs)
(lbs)
(Ibs)
(Ibs)
Larger of FXFB & COVP
55
1
3.09
0.98
109
35
55.7
9.3
FRIG
55
1
2.84
1.24
100
44
55.7
9.3
Diplexer
7.9
4
0.39
0.14
14
5
8.0
1.3
Line Loads
Weight
(Ibs)
Length
(ft)
Dia or Width
(in)
Weight
(plf)
Wind Forces
(1-0) (pIf)**
Seismic Forces
(1-0) (plf)
Dead Load, 0:
Total Weight of Components:
WP lb
Wind Load, W
Design Wind Pressure:
p psf
(1.OW)
Vtrans
263
lb 0.6 * Vtrans
158 lb
Vlong
98
lb 0.6 * Vlan.
59 lb
Seismic Load, E:
Consider Seismic: F--Y—es-7
Occupancy Category:
11
F. =
1.0
Seismic Design Category:
D
Fv =
1.5
It, =
1.00
SMS =
1.265
Site Class:
D
SMI =
0.745
Rp =
2.5
SDS =
0.843
S. =
1.265
SD1 =
0.497
S, =
0.495
ap =
0.7 * Fp,min
b
�b
Z =
M10
ft 0.7 * Fp._
h =
ft
z1h
0.7 * Fp,trans
100 lb
0.7 * Fp,l.ng
100 lb
F, lateral
1.012
F, vertical
0.169 0.7 * Fp,rt
lb
158 LBS < 532 LBS
< 1700 LBS
Controls over Seismic
Controls over Wind
MM01 OK
LWRM OK
Page 6 of 19
N_n 1
0 U Lus
A vahnm T cowANY
March 22, 2010
RE: ANSI/TIA-222-G Mount Capacity
Valmont / Site Pro I Mount: 4'Triple T-Arm with 2 Antenna Pipes
PartNo. RDS-23xxx RDS-NP (Ref 2-7/811 Antenna Pipe)
MMO1 UDS-NP (Ref 2-7/811 Antenna Pipe)
The 4'Tr1ple T-Arm referenced above has been analyzed in accordance with ANSI/TIA-222-
G-2005 standard using the following design criteria.
Mount Design Criteria
Structure Height
200'
Basic Wind Speed
90 mph (3-sec)
Structure Class
11
Exposure Category
C
Topographic Category
I
Design Ice Thickness
1.0"
Wind Direction Factor 0.95 Tubular Pole Structures, Lattice Structures with other than triangular,
square or rectangular cross -sections, strength design of appurtenances
Gust Effect Factor 0.85 Guyed Masts & Self Supporting Lattice Structures 450' tall or less
1.10 Tubular Pole Structures
Modehng & Applied Appurtenance Loadin
The mount was analyzed for two (2) antenna loads evenly spaced across each face of the
mount, centered on the centerline of the mount (i.e. no vertical eccentricity). Based on the
Design Criteria above, the mount capacity is 2,140 lbs (67.43 Sq-ft). The maximum normal
force per antenna pipe is 1,070lbs (33.71 Sq-ft) with a maximum tangential force of 532 lbs
(16.76 Sq-ft). The weight of each antenna was considered to be a maximum of 250 lbs. Self -
weight of the mount was also considered.
The mount will also support a nominal live load of 250 lbs at one (1) location to provide
access for a climber. This condition assumes no wind.
ARROO Valmont Site Pro 1
2400 Walter Glaub Drive Plymouth, Indiana 46563-4005 USA
AMICWFLECT 574-936-4221 Fox 574-936-8925 www.siteprol.com
Page 7 o 19
GUST FACTOR BASED ON: 3
1. latticed tower, overall height = antenna height
2. latticed tower, overall height = 200 ft
3. monopole tower
4. Guyed Tower
5. Structure supported on other structures
Radial Ice Thickness:
I
inch
Structure Class:
2
See Worksheet "Structure Class" for Description
Exposure Category C
See Worksheet "Exposure Category" for Description
Topography Category I
See Worksheet "Topography Category" for Description
eight of Crest Above Surrounding Area, H 1
(ft) If 0 ft, use 1.0
Height Above Ground Love] at the
Base of the Structure, z 0
(ft)
Wind Direction, Kd 0,95
See Worksheet "Wind Diroction " for Description
(EPA),, (ft) 0
0
(EPA), (ft')
See Worksheet "Wind Force on Appurtenances" for Description
0
0
K.
i.00
A f 0
Projected area of flat structural components in one face of the section
Projected area of round structural components in one face of the section
A r
including the projected area of Ice on flat and round structural components
0
In one face for loadina combinations that include Ice.
Ag
25
Gross area of one face as if the face were solid, sqft.
E
0.000
solidity ratio = (Af + A,)/Ag
Effective Projected Area (EPA)A for Maxlmum-Allowable Mount Load
on 4'Triple T-Arm (RDS-23xx) with 2 Antenna Pipes (sq-ft)
WIND LOAD: 2.1400 kips
HEIGHT
BASIC WIND SPEED
Imph)
(ft)
70
75
80
85
90
95
100
105
110
115
120
40
156.4355
136.2727
119.7709
106.0947
94.6338
84.9345
76.6534
69.5269
60
143.6361
125.1230
109.9714
97.4141
86.8910
77.9852
70.3817
80
135.1950
117.7699
103.5087
91.6893
81.7846
73.4023
66.2456
100
128.9907
112.3653
98.7585
87.4816
78.0314
70.0338
120
124.1334
108.1340
95.0397
1 84.1874
75.0931
67.3966
1
140
120.1696
104.6811
92.0049
81.4991
72.6952
160
116.8385
101.7793
89.4545
79.2399
70.6801
180
113.9769
99,2866
87.2636
77.2992
68.9490
200
111.4766
97.1085
85.3493
75.6035
67.4365
220 1
109.2621 1
95.1794
83.6538
74.1016 1
hilpi//plystnvebliEngineeringit.4ount Area and Capacity/Windload Rev 0 (Revised) 3122/2010 3:56 Phi
GUST FACTOR BASED ON:
3
1. latticed lower, overall height = antenna height
2. latticed tower, overall height = 200 ft
3. monopole tower
4. Guyed Tower
5. Structure supported on other structures
Radial Ice Thickness:
I
inch
Structure Class:
2
See Worksheet "Stnicture Class" for Description
Exposure Category
C
See Worksheet "Exposure Calegoiy" for Description
Topography Category
eight of Crest Above Surrounding Area, H
1
1
See Worksheet "Topography Categoty" for Description
Height Above Ground Level at the
00 If 0 it, use 1.0
Base of the Structure, z
0
(ft)
Wind Direction, Kd
0.95
See Worksheet "Wind Direction I, for Description
(EPA)N (ft2)
0
(EPA)T (ft)
0
0
0
See Worksheet "Wind Force on Appurtenances" for Description
Ka
i.00
A f
0
Projected area of flat structural components in one face of the section
A r
Projected area of round structural components in one face of the section
including the projected area of ice on flat
0
and round structural components
in one face for loadina combinations that include ice.
Aq
25
Gross area of one face as if the face were solid, sqft.
C
0.000
solidity ratio (At + A,)/Ag
Effective ProJected Area (EPA)A for Maximum Allowable Normal Load
on 4'Triple T-Arm (RDS-23xx) with 2 Antenna Pipes (sq-ft)
WIND LOAD: 1.0700 kips
EIGHT
BASIC ill
i�� i 1EE1
i 1 11' 11
1
40
70
78.2178
75
68.136
80
59-8855
85
53.0473
90 95, 10'0 105 110 116 120
473169 42.4673
60
71-81 8o
62.5615
54-9857
48.'7070
43'
.4455
38.9926
38.3267 34.7634
35.1908
80
67.5975
58.8849
51.7543
45.8447
40-8923
36.7011
33.1228
100
64.4954
56.1826
49 * 3793
.7408
39.0157
35,0169
120
62 ' 0667
54.0670
47-6198
42.0937
37.5dAX;
140
60.0848
52.3406
46.0024
40.7496
6.3476
160
58.4192
50.8897
44.7272
3
180
56.9885
49.6433
AA AA 1 A
'I
200
55.738"
An rr-
?20
64.6311 1
47.5097 1
41.8269 1
37,
19
bltp:liptystF%,tebl/Engineeringit,lount Area and CaPaCilyWindload Rev G (Revised)
312212010 3:56 Phi
Page 9 o 19
GUST FACTOR BASED ON: 3
1. latticed tower, overall height = antenna height
2. latticed tower, overall height = 200 ft
3. monopole tower
4. Guyed Tower
5. Structure supported on other structures
Radial Ice Thickness:
1
inch
Structure Class;
2
See Worksheet "Structure Class" for Description
Exposure Category C
See Worksheet "Exposure Categoty" for Description
Topography Category I
See Worksheet "Topography Category" for Description
eight of Crest Above
Surrounding Area, H I
(ft) If 0 ft, use 1.0
Height Above Ground Level at the
Base of the Structure, z 0
00
Wind Direction, Kd 0,96
See Worksheet "Wind Direction " for Description
(EPA)N (ft) 0
(EPA)T (ft2) 0
See Worksheet "Wind Force on Appurtenances" for Description
0 0
Ka 1-00
A f 0
Projected area of flat structural components in one face of the section
Projected area of round structural components in one face of the section
A r
including the projected area of ice on flat and round structural components
0
in one face for loadina combinations that include ice.
Ag
26
Gross area of one face as if (he face were solid, sqft,
E
0.000
solidity ratio = (Af + A,)/Ag
Effective Projected Area (EPA)A for Maximum Allowable Tangential Load
on 4' Triple T-Arm (RDS-23xx) with 2 Antenna Pipes (sq-ft)
WIND LOAD: 0,5320 kips
HEIGHT
BASIC WIND SPEED
(mph)
00
70
75
80
85
90
95
100
105
110
115
120
40
38.8896
33.8771
29,7748
26.3749
23.5258
21.1146
19.0559
17.2843
60
35.7077
31.1053
27.3387
24.2170
21.6009
19.31370
17.4968
80
33.6092
29.2774
25.7321
22.7938
20.3315
18.2477
16.4685
100
32.0669
27.9338
24.5512
21.7478
19.3985
17.4103
120
30.8593
26.8819
23.6267
1 20.9288
18.6680
16.7547
1
1
140
29.8739
26.0235
22.8722
20.2605
18.0719
160
29.0458
25.3021
22.2382
19.6989
17.5709
180
28.3345
24.6825
21.6936
19.2164
17.1
200
27.7129
24.11410
21.2177
18.7949
16.7646
220
fT7.1624 1
23.6614
20.7962 ,
18.4216 1
1
1
hilp!//plystf%-iebt/EngineeFing/Liount Area and Capacity/windload Rev G (Revised) 312212010 3:56 PIA
Page 10 of 19
SITE
PRO
A vaknordW compAw
Feb 22, 2010
RE: ANSI/TIA-222-G Mount Capacity
Valmont / Site Pro I Mount: Ring Mount Assembly
Part No. LWRM
The Ring Mount Assembly referenced above has been analyzed in accordance with
ANSI/TIA-222-G-2005 standard using the following design criteria.
Mount Desigga Criteri
Structure Height
200'
Basic Wind Speed
90 mph (3-sec)
Structure Class
II
Exposure Category
C
Topographic Category
I
Design Ice Thickness
1.0"
Wind Direction Factor 0.95 Tubular Pole Structures, Lattice Structures with other than triangular,
square or rectangular cross -sections, strength design of appurtenances
Gust Effect Factor 0.85 Guyed Masts & Self Supporting Lattice Structures 450' tall or less
1.10 Tubular Pole Structures
Modeling & Applied Appurtenance Loadin
The mount was analyzed for three (3) different loading scenarios. See page 2 for results.
Volmont Site Pro I
A P.-non 2400 Walter Glaub Drive Plymouth, Indiana 46563-4005 USA
AmlawawT 574-936-4221 Fox 574-936-8925 www.siteprol.com
Page 11 of 19
SITE
P,uFN
ja-V-19
A vaknmdV oawAw
Modeling & Applied Upurtenance Loading ScenArio 1
The Ring Mount Assembly (LWRM) was analyzed with an evenly distributed load on
each Ring Mount weldment (X-LvVW with an 18" moment arm. Based on the Des' ign
Criteria above, the maximum acceptable normal force is 5,060 lbs (159 sq ft) and the
maximum acceptable tangential force is 3,200 lbs (100 sq ft) per weldment. The allowable
applied weight (mount plus antenna) was considered to be a maximum of 1,700 lbs per
weldment. Self -weight of the assembly was also considered.
Modeling & Applied Appurtenance Loading Scen rio 2
The Ring Mount Assembly (LXVW was analyzed with an evenly distributed load on
each Ring Mount weldment (X-LVVW with a 36" moment arm. Based on the Design
Criteria above, the maximum acceptable normal force is 2,530 lbs (79 sq ft) and the maximum
acceptable tangential force is 1,600 (50 sq ft) lbs per weldment. The allowable applied weight
(mount plus antenna) was considered to be a maximum of 860 lbs per weldment. Self -weight
of the assembly was also considered.
Modeling & Applied Upurtenance Loading Scen rio 3
The Ring Mount Assembly (LXXTM) was analyzed with an evenly distributed load on
each Ring Mount weldment (X-LVVTd\/I) with a 48" moment arm. Based on the Design
Criteria above, the maximum acceptable normal force is 1,900 lbs (59 sq ft) and the maximum
acceptable tangential force is 1,200 lbs (37 sq ft) per weldment. The allowable applied weight
(mount plus antenna) was considered to be a maximum of 650 lbs per weldment. Self -weight
of the assembly was also considered.
Live load Rating:
The mount will also support a nominal load of 5,000 lbs at a position less than 6"
from the mounting surface (climber anchorage or safety climb). This condition assumes
no wind without additional loading from mounts or antennas.
This mount will also support a norruinal. load of 500 lbs located at two (2) locations
simultaneously (500 lbs total) to provide access for climbers. This condition assumes no
wind, but does include the self weight of the mount, platform, and antennas.
AP.-Ron Valmont Site Pro I
2400 Walter Glaub Drive Plymouth, Indiana 46563-4005 USA
07MCWFLEICT 574-936-4221 Fox 574-936-8925 www.siteprol.com
Page 12 of 19
GUST FACTOR BASED ON:
3
1. latticed tower, overall height = antenna height
2. latticed tower, overall height = 200, ft
3. monopole tower
4. Guyed Tower
5. Structure supported on other structures
Radial Ice Thickness:
1
inch
Structure Class:
2_
See Worksheet "Structure Class" for Description
Exposure Category
C
See Worksheet "Exposure Category" for Description
Topography Category
I
See Worksheet "Topography Category" for Description
eight of Crest Above Surrounding Area, H
.1.
(ft) If 0 ft, use 1.0
Height Above Ground Level at the
Base of the Structure, z
0..:...!
(ft)
Wind Direction, Kd
�0.95.
See Worksheet "Wind Direction" for Description
2
(EPA)N (ft
.:.0
(EPA)T
0.
See Worksheet "Wind Force on Appurtenances" for Description
0
-0
Ka
.1-00:
A f
0
Projected area of flat structural components in one face of the section
':::Projected
area of round structural components in one face of the section
A r
.*:,..".,.'including
the projected area of ice on flat and round structural components
in one face for loadina combinations that include ice.
Ag
'.Gross
area of one face as if the face were solid, sqft.
E
'o.00d.
"Solidity ratio (Af + Ar)/A9
Effective Projected Area (EPA)A for Maximum Normal Reaction Load on Ring Mount Weldment
(X-LWRM) with 18" Arm (sq ft)
WIND LOAD: :�': 5;0600 wkips
HEIGHT
BASIC WIND SPEED
(mph)
(ft)
70
75
80
85
90
95
100
105
110
115
1:20
40
369.8896
322.2149
283.1967
250.8594
223.7604
200.8265
181.2459
164.3954
60
339.6255
295.8515.
260.0258
230.3342
205.4525
184.3950
166.4165,
80
319.6667
278.4652
244.7448
216.7982
193.3786
173.5586
1.00
304.9968,
265.6861
233.5132
206.8490
184.5042
165.5938
1:20
293.5118
255.68141224.7200
199.0599
177.5565
159.35821
1
140
284.1394
247.5170
217.5442
192.7035
1,71.8868
1.60
276.2630
240.6557
211.5138
187.3617
167.1220
180
269.4965
234.7617
206.3335
� 1'82.7730
163.029b.
200
263.5849
229.6117
201.8072
178.7635
159.4526
220
258.3487
1225.0504
1,97.79821
175.21:23:1
http://plysirwobl/Engineering/Mount Area and Capacity/Windload Rev G (Revised) 1219/2009 1:59 PM
Page 13 of 19
GUST FACTOR BASED ON:
3
1. latticed tower, overall height = antenna height
2. latticed tower, overall height = 200 ft
3. monopole tower
4. Guyed Tower
5. Structure supported on other structures
Radial Ice Thickness:
1,
inch
Structure Class:
2
See Worksheet "Structure Class" for Description
Exposure Category
..0
:See Worksheet "Exposure Category" for Description
Topography Category
I
See Worksheet "Topography Category" for Description
eight of Crest Above Surrounding Area, H
(ft) If 0 ft, use 1.0
Height Above Ground Level at the
Base of the Structure, z
'0
Wind Direction, Kd
See Worksheet "Wind Direction" for Description
(EPA)N
(EPA)T
0:
"Wind
See Worksheet Force on Appurtenances" for Description
0
�0
Ka
1.00
A f
0
Projected area of flat structural components in one face of the section
d.
Projected area of round structural components in one face of the section
A r
*,
including the projected area of ice on flat and round structural components
0
in one face for loadina combinations that include ice.
Ag
2 5
Gross area of one face as if the face were solid, sqft.
0.000
solidity ratio = (Af + Ar)/A9
Effective Projected Area (EPA)A for Maximum Tangential Reaction Load on Ring Mount Weldment
(X-LWRM) with 18" Arm (sq ft)
WIND LOAD: 3.2000 kips
HEIGHT
BASIC WIND SPEED
(mph)
(ft)
70
75
80
85
90
95
100:
105
110
1:15
120
40
233.9223
203.7723
179.0967
158.6463
141.5085
127.0049
114.6219
103.9655
60
214.7829
1'87.0998
� 1:64.4432
145.6659
129.9304
116.61:34
105.2436
80
202.1608
176.1045
154.7793
137.1056
122.2948
109.7604
100
192.8834
1:68.0228,
147.6763
130.8136
116.6825,
1,04.7234
120
185.6201
161.69571
142.1154
125.8877
112.28871
100.7799
1
140
17M929
156.53251
137.5774
121.8679
108.7031
160
174.7118
152.1933
133.7637
118.4896
105.6898
180
170.4328
148.4659
130.4876
11,5.5876
103.1,013;
200
1 166.6940
145.2090
127.6251
113.0520
100.8396
220
1 163.3826
142.3244
1 25.0898,1�
110.8062
http://plystrwobi/Engineering/Mount Area and CapacityMindload Rev G (Revised) 12/9/2009 1:57 PM
PARTS LIST
ITEM QTY
PART NO.
PART DESCRIPTION
LENGTH UNITWT.
NET WT.
1
1
X-WWM0l
S" STAND-OFF ARM / WALL MOUNT
18.12
18.12
2
4
A682112
6/8" x 2-1/2" HDG A326 HEX BOLT
2 112 in 0.33
1.34
3
4
A58FW
618" HDG A325 FLATWASHER
0.03
0.14
4
4
G58LW
5/8" HDG LOCKWASHER
0.03
0.10
5
4
A58NUT
5/8*'HDG A326 HEX NUT
0.13
0.62
6
6
2
2
X-UB1212
X-UB1300
1/2" X 2-112" X 4-112" X 2** GALV. U-BOLT
1/2" X 3" X 5" X 2" GALV U-BOLT
0.66
0.70
1.31
1.39
6
2
X-UB1358
112" X 3-518" X 5-1/2" X 3" GALV U-BOLT
0.77
1.64
7
4
G12FW
1/2" HDG USS FLATWASHER
0.03
0.14
8
4
G12LW
1/2" HDG LOCKWASHER
0.01
0.06
9
4
-19NUT
112" HnG HEAVY 2H HEX NUT
0.07
0.29
TOTAL WT. 111
26.06
A
2-318" OD PIPE, 2-718" OD PIPE or 3-1/2" OD PIPE,
PIPE NOT INCLUDED
QErAIL A
TOLERANCE NOTES
Locations:
DESCRIPTION
New York, NY
TOLERANCES ON DIMENSIONS, UNLESS OTHERWISE NOTED ARE:
6" STAND-OFF
Engs—ed,g AII-t.. GA
SJAWED. SHEARED AND GAS OUT EDGES (* 0,M')
ANTENNA WALL MOUNT,
Support Tem: L.. Ang.l.., CA
DRtLLED AND SAO OUT HOLES (*GO$" - NO CONING OF HOLES
SITE PRO 1
1-888-753-7446 Plymouth, IN
SaWm. OR
LAM CUT EDGES AND HOLES (*42010') - NO CONING OF HOLES
Avalmontir� Dall-, TX
BENDS ARE 2112 DEGREE
CPO NO.
DRAWN BY
ENG.APPR VAL
PART NO.
ALL OTHER MACHINING (4 OLM-)
ALL OTHER ASSEMBLY OGM-)
47114
RI-118 3123/2010
mmol
CLASS
SUB
DRAWING USAGE
CHECKEDBY
DWG.. 0.
81
01
CUSTOMER
BMC 5/10/2010
mmol
-F�
21
8
(SEE IN GE 3)
r— PA
24" 0
STAN
(CUT AS R
LENGTH
)THE
:TER.
IAY BE CUT
EQUIRED.
4-LI
9 17132"
INMI
0 M,10--
NMI
1--
I'Mm
110111111
IM1
IMN I
im-,
Fm-1
TOLERANCE NOTES
DIMM LEP OTHERINISE NOTED ME:
AND=
TXMI. SH1=D ED, , Raw"
DRILLEDAND QASCUT HOLES (*dLGM- NOODNING OF HOLES
LASER OUT EDGES AND HOLES (* 0,0109 - NO CONING OF HOLES
BENDS ARE * 112 DEGREE
ALL OTHER MACHINING (* 4LM-)
ALL OTHER ASSEMBLY (* 0,=-)
ITEMICITY1
PARTNO.
PARTOESCRIPTION
LENGTH
UNITWT.
I NETWT.
1
3
XmLWRM
RING MOUNT WELOMENT
68.16
204.48
2
9
GSBR-48
5/8" It 48"THREADED ROD (HDG.)
48 in
4.18
37.63
3
9
G58R-24
518" x 24" THREADED ROD (HDG.)
24 in
2.09
18.82
4
18
A58FW
5/8" HDG A326 FLATWASHER
0.03
0.61
5
18
G58LW
518" HDG LOCKWASHER
0.03
0.47
6
18
A58NUT
518" HDG A326 HEX NUT
0.13
2.34
TOTAL WT. 0
264.35
DESCRIPTION
RING MOUNT
ASSEMBLY
12"TO 45"DIAMETER POLE
4433 1 BMC 3117120091
DRAWING USAGE I CHECKED BY
CUSTOMER CEK 8124/2012
No. Y-k. NY
E.gi.—Hng
Abumto, GA
Support Team:
Lot, CA
Plym—'h JN
&Vatnvcatlw�
Salem. OR
D.It-, TX 0
T NO.
LWRM
1.
1. NO.
LWRM
c.n
0
8
IN
(SEE PAGE 3)
\0
9 1 132"'
:E7.1 �4= :71 - =--:
P/N RM-ADK
OPTIONAL LARGE DIAMETER ADAPTER ASSEMBLY
FOR USE WITH LWRM (SOLD SEPARATELY)
PARTS LIST
ITEM
QTY
PART NO.
PART DESCRIPTION
LENGTH
I UNIT WT.
F NET WT.
1
6
X-178627
BENT EXTENSION BRACKET
16.80
94.79
2
is
A5802
518" x 2" HDG A325 HEX BOLT
2in
0.27
4.89
3
is
G68LW
618" HDG LOCKWASHER
0.03
0.94
4
18
A58NUT
6/8" HDG A325 HEX NUT
013
468
61W*
(REF)
TOLERANCE NOTES
TOLERANCES ON DIMENSIONS. UNLESS OTHERMSE NOTED ARE:
SAWED. SHEARED AND GAS CUT EDGES 0 dM7
DRILLED AND GAS CUT HOLES (*90" - NO CONING OF HOLES
LASER CUT EDGES AND HOLES N a0107 - NO CONING OF HOLES
SENDS ARE 1112 DEGREE
ALL OTHER MACHINING (* AM-)
ALL OTHER ASSEMBLY (4 GOO-)
DESCRIPTION
RING MOUNT
ASSEMBLY
12" TO 45" DIAMETER POLE
4433 1 BMC 3/17/20091
IT.T—SU. I RAII.N. U.A.E ..".70 a' —
!J-01 CUSTOMER JCEK 8/2412012
36" TO 60"
DIAMETER
MONOPOLE
TOTAL WEIGHT: 105.309
A
LWRM ASSEMBLY
(SEE PAGE 1)
Locati—
New Y�WNY
Engineering
Atlent., GA
SupportT.—
Avalmomw6wIlmiII,
Lo. Angel—, CA
Plymouth, IN
Sete., OR
DaIIas,TX
T NO.
RM-ADK
NO.
-n
m
LWRM
��j
to
to
.
a)
R
8
VALMONT IS SUPPLYING THE VALUE
OF THE "W" DIMENSIONS TO ASSIST
THE ERECTOR IN PRE -ASSEMBLING
THE CLAMPS & TIE RODS.
POLE DIAMETER IS
CALCULATED FROM
MEASURED
CIRCUMFERENCE
THE CIRCUMFERENCE IS THE
DISTANCE MEASURED AROUND THE
OUTSIDE OF THE POLE AT THE
LOCATION OF THE CLAMP.
CIRCUMF
DIA (REF)
W
CIRCUMF
DIA (REF)
W
CIRCUMF
DIA (REF)
W
CIRCUMF
DIA (REF)
W
CIRCUMF
DIA (REF)
W
CIRCUMF
DIA(REF)
W
38"
12-118"
9�3116"
63.
20-1/16"
16-3116"
88"
28"
23-3116"
113"
36"
30-3116"
138'
43-16116"
37-114"
163"
51-7/8"
44-5116"
39"
12-7116"
9-7116"
64"
20-318"
16-7116"
89..
28-5116"
23-112"
114"
36-5116"
30-112"
139"
44-114�'
37-1/2"
164"
52-.V16"
44-9116"
'40..
12-314"
9.314"
65"
20-11116"
16-314"
90"
28-518"
23-314"
lis"
36-518"
30-314**
1,w..
44-91`16-
37-13/16"
165'
52-112"
44-7/8"
41"
113-1116"
10"
21"
17"
91..
28-15116"
24-1116"
116"
36-15116"
31-1116-
141"
44-718"
38-1116"
166"
52-13116"
45-3116"
42"
13-3/8-
10-5/16"
67"
21-5/16"
17-5/16'
92"
29-5116**
24-5116"
lir,
37-114"
31-5116"
142"
45-3116"
38-3/8"
l6r'
53-3116"
45-7116"
1*1.
13-11116"
10-9116"
68"
21-618"
17-9116"
93"
29-5/8"
24-5/8"
Ila"
37-9116"
31-5/8"
1'*..
45-112"
38-9/16"
168"
53-112"
45-3/4"
14"
10-7/8"
69..
21-15116"
17-7/8"
94"
29-16116"
24-7/8"
1191,
37-7/8"
31-7/8"
1"..
45-13116"
38-718**
169"
53-13116"
46"
'151.
14-5116"
11-2116"
70"
22-5/16"
18-1/81,
95"
30-1/4"
26-1 /8"
120"
38-3116"
32-3/16"
1"..
46-1/8"
39-118"
170"
54-1/8"
465/16"
14-518"
11-3/8"
71"
22-518"
18-7116"
96"
30-9/16"
25-7/16"
121"
38-1/2"
32-7116"
1"..
46-112"
39-7/16"
1171"
54-7116"
46-9/16"
47"
14-15116"
11-11116"
72"
22-16116"
18-11116"
97"
30-7/8"
25-11116"
122"
38-13/16"
32-3/4"
147"
46-13116"
39-3/4"
172"
54-3/4"
46-7/8"
'a..
15-114"
11 -16116"
73"
23-1/4"
19.1
98..
31-3116"
26"
123"
39-1/8"
33"
49"
15-518"
12.1/,V'
74"
23-9116"
19-1/4"
99..
31-1/2"
26-IW'
124�'
39-1/2"
33-5/16"
149"
47-7/16"
40-5/16"
174"
55-3/8"
47-7116"
so..
15-15116*1
12-1/7*
75"
23-7/8"
19-9116"
1001,
31-13116"
26-9/16"
125"
39-13/16"
33-9/16"
160"
47-314"
40-9116"
175**
55-11116"
47-11 /1 v-
si..
16-114"
12-13116"
76"
24-114"
19-13116"
loll,
32-118"
26-13116"
126"
40-1/8"
33-718"
15111
48-1116"
40-7/8"
176"
56"
48"
52"
16-9116"
13-1116"
77"
24-1/2"
20-1/8"
102"
32-7116-
1 27"
12T'
40-7/16-
1 34-118"
152"
48-318" 1
41-3116"
177"
56-6116"
48-1/4"
53"
1 16-718-
13-318"
78"
24-13116"
20-3/8"
103**
32-13116"
27-3/8-
128"
40-3/4"
34-7/16"
153"
48-11116"
41-7116"
178"
56-11/16"
48-9116"
W.
17-311W'
13-51W'
79"
25-118"
20-11116"
104"
33-118"
27-11116"
129"
41-1116"
31-11116"
154'
49"
41-3/4"
179**
57"
48-7/8"
55"
17-1 f2"
13-15116"
80..
25-7116'
20-15116"
105"
33-7116"
27-15116"
130"
41-3/8"
35"
'156"
49-5116"
42"
1801,
57-5116"
49-1/8"
56"
17-13/16"
14-3116"
81.1
25-13116"
21-1/4"
106"
33-314-
28-1/4"
131"
41-11116**
35-11W'
1561,
49-11116"
42-5116"
18111
57-518"
49-7/16"
57"
18-118"
i4-lir
82"
26-118"
21-1/2"
107"
34-1/16"
28-112"
132"
42"
35-9116"
157"
50"
42-518"
182"
57-15116"
49-11116"
W.
18-7116"
14-314"
83"
26-7116"
21-13/16"
108"
34-318"
28-13116"
133"
42-5/16"
35-13/16"
ISS"
50-5116"
42-718"
183"
68-1/4"
50"
59..
18-314**
15-1/16"
84.
26-3/4"
22-1116"
109"
34-11116"
29-1/16"
1 U..
42-6/8-
36-118"
159"
5M/S"
43-3/16"
184"
58-9/16"
50-1/4"
60"
19,18"
1 15-5116--
85"
L-"'
1 3 -212;
29-318-
135-
'Q'.
6-2!2
1 160"
50-15116"
43-7116"
ias"
58-7/8"
50-9116"
61"
TRITF
'15-51
:27;";
277-.81�
232-518;
11112
3g375111"
29-5/8-
1 136"
43 5116"
1
121
43-314"
1�t'
t9-3141'
50-13116"
62"
19-314"
15-71.%
27-11116"
1 22-15116" 1
112"
1 36-618-
29-15/16"
1 13r'
1 36-15/16"
1 1 2;;
51-9116" 1
187"
59_112
si..
188*1
189"
59-13/16"
60-3116"
51-3/8"
51-11/16"
TOLERANCE NOTES
TOLERANCES ON DIMENSIONS.
SAWED. SHEARED AND GAS
DRILLED AND GAS CUT HOLES
LASER CUT EDGES AND HOLES
BENOSARE2 112 DEGREE
ALL OTHER MACHINING 4* OLM-)
ALL OTHER ASSEMBLY 0 4=7
UNLESS OTHERWISE
CUT EDGES (*QM7
(*0,00 - NO
(*6,010 - NO
NOTED
CONING OF HOLES
CONING OF HOLES
ARE'
'DESCRIPTI
N
RING
ASSEMBLY
12" TO 45"
MOUNT
DIAMETER
POLE
Support
1-888-753-7446
Now
E.gi ... ri.g AU..t.,
Team: I—
L-Ilymo!-th"IN
Sale..
D.1tee,
York, NY
GA
CA
OR
TX
CPD NO.
4433
DRAWN BY
BMC 3/17/2009
ENG.APPR VAL
PART NO.
1 LWRM
W
I A
IREDRA IN IN INV, UPDATED TABLES& VIEWS
I 1KCS1
'apeat"I'maY
��—A--
CLASS
81
SU
01
DRAWING USAGE
CUSTOMER
CHECKED By
I CEK 8/24/20121
—
DWG. NO.
LWRM
1 REV
I DESCRIPTION OF REVISIONS
I CPD I
BY
I
I REVISIONHISTORY
10/19/2015 Search Results for Map Page 18 of 19
ASCE 7 Windspeed ASCE 7 Ground Snow Load Related Resources Sponsors About ATC Contact
Search Results
Query Date: Mon Oct 19 2015
Latitude: 47.8003
Longitude: -122.3615
ASCE 7-10 Windspeeds
(3-sec peak gust in mph*):
Risk Category 1: 100
Risk Category 11: 110
Risk Category III -IV: 115
MRI** 10-Year: 72
MRI** 25-Year: 79
MRI** 50-Year: 85
Ii 100-Year: 91
ASCE 7-05 Windspeed:
85 (3-sec peak gust in mph)
ASCE 7-93 Windspeed:
70 (fastest mile in mph)
*Miles per hour
Mean Recurrence Interval
Users should consult with local building officials
to determine if there are community -specific wind speed
requirements that govern.
M=
—I Print your results
..........
Z
Q
A
V
W%
WINDSPEED WEBSITE DISCLAIMER
While the information presented on this website is believed to be correct, ATC and its sponsors and contributors
assume no responsibility or liability for its accuracy. The material presented in the windspeed report should not
be used or relied upon for any specific application without competent examination and verification of its
accuracy, suitability and applicability by engineers or other licensed professionals. ATC does not intend that the
use of this information replace the sound judgment of such competent professionals, having experience and
knowledge in the field of practice, nor to substitute for the standard of care required of such professionals in
interpreting and applying the results of the windspeed report provided by this website. Users of the information
from this website assume all liability arising from such use. Use of the output of this website does not imply
approval by the governing building code bodies responsible for building code approval and interpretation for the
building site described by latitude/longitude location in the windspeed load report.
Sponsored by the ATC Endowment Fund - Applied Technology Council - 201 Redwood Shores Parkway, Suite 240 - Redwood City, Califonnia 94065 - (650) 595-1542
http:/AAtindspeed.atcouncii.orgri ndex.php?opbon=com—content&view=arbcle&id= 10&dec= I&Iabtude--47.800278&longitude=- 1 22.361472&risk_category_i= 1 00&r... 1/1
10/19/2015 Design Maps Summary Report
WM Design Maps Summary Report
M
User —Specified Input
Report Title Edmonds Pkwy
Mon October 19, 2015 18:15:03 UTC
Building Code Reference Document 2012 International Building Code
(which utilizes USGS hazard data available in 2008)
Site Coordinates 47.800280N, 122.36147OW
Site Soil Classification Site Class D - "Stiff Soil"
Risk Category I/II/III
_j 5000M
Kilngstan
Indianola -
�`o
!1S,mapiquesit'
USGS-Provided Output
Ss = 1.265 g
S, = 0.495 g
02015
S,s = 1.265 g
S,, = 0.745 g
10
J.
S,s = 0.843 g
S,, = 0.497 g
Will Greloll(,
0)
A North Cr-
0
4L
Me oddi Mano'r.,—,N
1'e r r a
0 malliquest
Page 19 of 19
For information on how the SS and S1 values above have been calculated from probabilistic (risk -targeted) and
deterministic ground motions in the direction of maximum horizontal response, please return to the application and
select the "2009 NEHRP" building code reference document.
MCER Response Spectrum
1.43--
1.30--
0.79
0.65-
0.52-
0. 39 - F_
0.26--
0.13--
0,00 1-
0.00 0.20 0.40 O.Go 0.20 1.00 1.20 1.40 1.60 1.�90 2.00
Period, T (sec)
Design Response Spectrum
0.99
0.90-.
0.91 __
0.72--
0.63--
0.54--
r il 0.45-
A
0. 36 -
0.27--
0.19--
0.03
0.00 1
0. 0 0.20 0.40 0.60 0.90 1.00 1.20 1.40 1.60 1.20 2.00
Period, T Isec)
Although this information is a product of the U.S. Geological Survey, we provide no warranty, expressed or implied, as to the
http://ehpl-earthquake.cr.usgs.gov/designmaps/us/summary.php?template=minimal&Iattude=47.800278&longitude=-122.361472&siteclass=3&riskcategory=0... 1/2
Existing
LRECEOVED
APPROX. NOV 2015
PHOTO
LOCATIoIsDEVELOPMENT SEPMES
COUNTER
Mobile 0-
Im, mr-p-mull.
PROPOSED
ANTENNA EDMONDS PKWY
LOCATIONS
w Looking North
(3) (N) T-MOBILE PANEL ANTENN S
& (3) (N) FRLB RR S
MOUNTED TO (E) 90.1 - AGL
WOOD UTILITY POLE
-SEE NOTES
Proposed
NOTES:
1. PM/GC TO VERIFY PAINTING REQUIREMENTS WITH JURISDICTION PRIOR TO ORDERING SUPPORT STRUCTURES,
IF= —1 F--n -u- ff--,n m L-j n n,.-ir u =D ATTACHMENTS, ANTENNAS, AND OTHER APPURTENANCES.
*CENTERLINE 2. VISUAL IMPACTS WILL BE AFFECTEGBY LOCATION AND VISIBILITY OF OBSERVER. THIS DOCUMENT IS FOR
PLANNING AND INFORMATION PURPOSES ONLY AND IS CONCEPTUAL. THIS IS SOLELY THE PHOTOGRAPHER'S
SOLUTIONS INTERPRETATION OF THE PROPOSED DEVELOPMENT
1
#APPROX.
T m mMobile,
w PHOTO
m LOCATION
CO 0 APPROX.
Ll- PROPOSED
0
EDMONDS PKWY
ANTENNA
< LOCATIONS
EE
Looking Northeast
w
er
Existing
F=0 " c:::i -iF ca Em- i " " i i c=j r-4
*CENTERLINE
SOLUTIONS
(3) (N) T-MOBILE PANEL ANTENNAS
& (3) (N) FRLS RRUS
MOUNTED TO (E) 90.1'AGL
WOOD UTILITY POLE
-SEE NOTES
Proposed
NOTES:
1. PM/GC TO VERIFY PAINTING REQUIREMENTS WITH JURISDICTION PRIOR TO ORDERING SUPPORT STRUCTURES.
ATTACHMENTS, ANTENNAS, AND OTHER APPURTENANGES.
2. VISUAL IMPACTS WILL BE AFFECTED BY LOCATION AND VISIBILITY OF OBSERVER. THIS DOCUMENT IS FOR
PLANNING AND INFORMATION PURPOSES ONLYAND IS CONCEPTUAL. THIS IS SOLELY THE PHOTOGRAPHER'S
INTERPRETATION OF THE PROPOSED DEVELOPMENT.
<
0 APPROX.
m mMobile,
PHOTO
LOCATION
CO
LL
APPROX.
PROPOSED
EDMONDS PKWY
ANTENNA
77� <
LOCATIONS
-f7
Looking South
i%
-4
Existing Proposed
NOTES:
1. PM/GC TO VERIFY PAINTING REQUIREMENTS WITH JURISDICTION PRIOR TO ORDERING SUPPORT STRUCTURES,
IF= D--§ 1--11 -9- C3 -c=3 0 r'4 L-D L- 0 ATTACHMENTS, ANTENNAS, AND OTHER APPURTENANCES.
*CENTERLINE 2. VISUAL IMPACTS WILL BE AFFECTED BY LOCATION AND VISIBILITY OF OBSERVER. THIS DOCUMENT IS FOR
PLANNING AND INFORMATION PURPOSES ONLY AND IS CONCEPTUAL. THIS IS SOLELY THE PHOTOGRAPHER'S
SOLUTIONS INTERPRETATION OF THE PROPOSED DEVELOPMENT
3
0
2L,
'4 'V,
0 7
�T t
0. >
Existing
0 APPROX.
PHOTO
m 0
OZ o oMobfle'-
LOCATION
0 APPROX.
PROPOSED
EDMONDS PKWY
ANTENNA
LOCATIONS
Looking Southeast
(3) (N) T-MOBILE PANEL ANTENNAS
& (3) (N) FRLB RRUS
M UNTIED TO (E) 93.1'AGL
WOOD UTILITY POLE
-SEE NOTES
Proposed
NOTES:
1. PWGC TO VERIFY PAINTING REQUIREMENTS WITH JURISDICTION PRIOR TO ORDERING SUPPORT STRUCTURES,
u r,4 L_o n -,-T- 0 r--n ATTACHMENTS. ANTENNAS, AND OTHER APPURTENANCES.
*CENTERLINE 2. VISUAL IMPACTS WILL BE AFFECTED BY LOCATION AND VISIBILITY OF OBSERVER. THIS DOCUMENT IS FOR
PLANNING AND INFORMATION PURPOSES ONLYAND IS CONCEPTUAL. THIS IS SOLELY THE PHOTOGRAPHER'S
SOLUTIONS INTERPRETATION OF THE PROPOSED DEVELOPMENT
El
% Al
—1
(E) ADJACENT
PROPERTY LINE (TY'P)
1 1 OVERALL SITE PLAN
3:
w
x
R�j
T-MOE
�EE
(E) T-MOBILE U/G CONDUIT ROUTE; (4) 6"0
SHEET A4.0
CONDUITS W1 (6) RUNS OF 1-5/8"COAX, (1)
HYBRID HI -CAP CABLE, (1) LMU BUNDLE, &
(3) RET CABLES (300 LF) TO REMAIN
—,70AX--
OA
— — -- — -- — --
A7_� —COAX
_---COAX
HYBRID
D�
Hy Rjj�
YB
SR
HYS 111)
DRAWING LEGEND
SU13JECT PROPERTY LINE
ADJACENT PROPERTY LINE
—COAX—
COAX ROUTE
HYBRID
HYBRID CABLE ROUTE
EXISTING FENCE
ELEVATION MARKER
DETAIL REFERENCE
SECTION MARKER
COMMON ABBREVIATIONS
(E) EXISTING
(N) NEW ABBREVIATIONS CONTINUED
(TYP) TYPICAL
ON SHEET GN1.0
NOTE:
SITE PLAN DERIVED FROM; EXISTING DRAWINGS, GIS, AERIAL
IMAGES AND SITE PHOTOS.
T-MOBILE PROJECT AREA
PARCEL #: 00373600700901
1000� SEE SHEET A2.0
'X
(E) OTHER CARRIER
EQUIP. ROOM
ECT Zone R-5 Comer Flag
(E) SUBJ
PROPERTY LI E (TYP)
Setbacka B�Ieguired Ag.jua.1
INGRESS/EGRESS Front
FROM 96TH AVE W
Sides
APPROVED BY, PLANNIN
Rear
(E) LINE OF T REE CANOPY
I
ENGINE�?'
" III fell
T - -Mobile..
CASCADIA' PM
Precision Program Management
*CENTERLINE
SOLUTIONS
AdVanCing wwe&.z Net"04y
WAS
5
108/18/2015
rCPM —PROJECT NO.: 8907
PREUMINARY
fRO=EATE
I D/C
I DESCRIPTION
=06-24-15
1JG/MS1
CLIENT COMMENT
"4
0 1;2�""!
CLIENT COMMENT
EZr
SUBMITTAL
NOI
DATE
I DIC
1 DE§251PTION
150§;21-
TO
6_
P SUBMITTAL
1
8_,8_151
'3
S, MS!
CLIENT COMMENT
t
I
I
SITE NAME:
EDMONDSPKWY/
SNOPUD/HECOX
SITE ID:
SE01575A
SITE ADDRESS:
21909 96TH AVE W
EDMONDS. WA 98020
D ate: SHEET TITLE
16.2- OVERALL
STREET Fi,LE TN MN SITE PLAN
SHEETNO.
S 0 OCT K' 3 2015
SCALE: 1 30'-0 (11 X1 7) 1 0. 15' 30' 60' A
go m n1NM ri
L B—DEPARe-MENT
SCALE: I" 15'-O"(22X34) CITY OF E NDS
Nalp 1 M��
m (-f - coib 70 15 (A 40 i
LANE CLOS.
(TWO
hA6:
W20-1
W20-4 AD
Z,
W20-7A<T-
.
Z�-
00
04
N,
NORTH
G20-2AF'
( Rw �wqxj
(OPTIONAL)
�URE
ON 9
FLAGGER OPEF
c
0
0
-3:
02
Lli
ol
,
>
0�
0
0
0)
0
0
r
6TH AVE W
!ATION)
G20-:2A
(OPTIONAL)
Qf A mi*
SPEED
'LIMIT
IIIN
( IG
P�CIN
Al I IF T)
BUFFER
(FT)
200
55
30
200
85--
35
350
12G
40
350
.170
45
.500
220
50
500
1 280
55
500
1 335
W20-7A
ONE�LpiE
.�.pkq, W20-4
AHEAD
0
ROAD
wbf!� W20-1
AHEAD
ENGINEERING DIVISION
A P V 0 S NOT D
DaW
f SNOHOMISH COUN7Y. I
u- [MMO TRAFFIC CONTROL PLAN
lY DISIRIMM I/ Awimamr..
PROJECT _T-MOBILE EDMONDS PARKWAY LTE MOD f 1 16
LdCATION 21909 96TH AVE W EDMONDS 98020 fitt -H
ENGINEER ANDERS DAHL DATE 7/15/2015 WO NO 100000271 —
PHONE 425-783-4342
c
.01
T?
'o
c:
0
co
0
0 to
L)
0
), I
0
,�,uj
0 PLANNING DATA street
SINGLE FAMILY RESIDENTIAL
Name: -f-MD10ije- I TI'M -HP-COX
RevIeWDate: 013.1S.,poocl
SiteAddress: /l/19ID9 Cl(olli AVC-\A/
Permit Number: /1/()Dg . 0 7 �-7
Project Description: 11 x 1+ e-9LAipVnCV1f- GhClter f- addf-ftor) of .3
pavl?A avitenna6 ovi re-plciceci Pup pole,
Zoning: P-6 —5
1 Comp Plan:
Corner'l-0t: (YES is
Flag Lot: (YES /0
]:VEaiance:
mall Site Plan: Oe NO)
ADU Created: (YES 60)
LLA:
CUP:
r
Shoreline:
Subdivision/Legal/Recording Number:
Legal Nonconforming Land use Determination Issued: (YES
Critical Areas Determination P-A- , W 01 - 0 0 7-5'
Study Required
waiver
SEPA Determination: tyfMP4 —kxh1itje"2
ReqUired SetbOCkS
Street:
cl-t-
\N e, 1-9
Side:
0 0 rl-�l 7.6 1
Side:
1 15 D Ut�j
Rear:
tA t;t
ActualSetbacks
Street-
\N P- j�- — 11 �5
Side:
5D+
Side:
� -;E)Qt�l (31
Rear.
-P,61 ei F) 60
�DetaCh�edStructure�s 9 ReeI(erieG.'Retafl9W0-Wsft 0 FeAeeSoq-F�- �rs
Bay-U4ROowsA2Fejeet-tng-Modataftn e >-391&taws 9 Geveped-geek4lPar-GM >-3eLE-aves
CZWAneW�ce * wigeeveFe"ReRc-4esed-.*-3GL9@GKA2Q=WP-aW
Parking Required: 2
Parking Provided: ,?, NIC,
I
coverage Required: 35%
Coverage Provided:
I
i —
Lot Area:
Lot Coverage
Calculations:
BUIlding Height
Datum Point:
Datum Elevation:
MaXiMUM Height:
Actual Height:
-nVei, . comniLAn i ty m -e f--h . n3 requiv-ed he14 1011L+
.571
pvuve, " Vvi 1,("VD
V1 t Of VDIC- EP
a OA
le-1—
I aM A Cy t, t4,F f V-1 A-P
Plan Review BW: Gina Coccla, ASsoclate Planner
a M I't VV — -f-A (A. 11, ty "
REGARDING: 21909 96th Avenue West 42,5- --6 Q 6,S6
(address)
R E C 0 R D 0 F C 0 N T A C T S
DATE NAME, PHONE NO., & COMMENTS
ADDRESS of CALLER
4/4/77 Willian Hecox Certified Letter No. 406814 sent
requiring hook-up by 7/1/77.
CON-NECTUN: COMPLETED: 5-2:3-77
COE
ACTION TAKEN
Letter received.
INITIALS
JT
CITY of EDMONDS
200 Dayton Street - Edmonds, Washington 98020 - Telephone (206) 775-2525
Department of Public Works
CERTIFIED MAIL4aod/
Mr. or Mrs. William J. Hecox
21909 96th Avenue West
Edmonds, Washington 98020
Dear Mr. or Mrs. Hecox:
April 4, 1977
Following a petition by a majority of the residents in your neigh-
borhood, the City Council of Edmonds accepted the annexation in-
corporating your property, located at 21909 96th Avenue West,
within the City limits. Officially, the annexation became effective
November 6, 1976. The City has now transferred accounts from the
Alderwood Water District to the Edmonds water system. Billing has
been converted to the Edmonds water rate and utility fee.
The major motivation for annexing to the City was to obtain avail-
ability for sewer hookups. Our records indicate that your property
abuts an existing sewer main and you are, therefore, required to
make connection. City Ordinance normally requires connection within
60 days. However, on annexation we allow for inclement weather con-
ditions and additional time for the home owners to make necessary
arrangements. We are establishing a date of July 1, 1977, as the
time in which you must have your'residence connected to sewers.
Requirements for obtaining a Side -Sewer Permit are as follows:
1. Payment of connection fee. Please bring the legal
description of your property to the Public Works De-
partment prior to your request for a Permit so that
the connection fee can be computed.
2. Payment of $35 Permit fee.
3. Copies of all recorded easements (where applicable).
4. A plot -plan drawing of the proposed connection.
Side -Sewer Permits may be obtained at the Public Works Department,
200 Dayton Street, Edmonds, between the hours of 8:00 a.m. and
5:00 p.m., Monday through Friday.
Please phone Mr. John B. Mitchell, Water Sewer Superintendent, at
775-2525, extension 226, for any information or assistance you may
desire.
Yo V'
ru
LEIF LARSON, P.E.
Direct r of Public Works
J BM: RHA: j t
RECEIPT FOR CERTIFIED MAIL-30� (plus postage)
SENT TO POSTMARK
Mr. or Mrs. William J. Hecox OR DATE
STREET AND NO.
21909 96th Avenue West 0
P.O., STATE AND ZIP CODE
\� 'p
Edmonds, \ . �)
_yashington 98020 (9
CD OPTIONAL SERVICES FO F!E—S—
R ADDITIONAL 1. �:E !:
RETURN N 1. Shows to whom,and date d Ii r
RECEIPT With delivery to a dres a n S4
hows to whom, date and w e Ve
SERVICES With delivery to addres e 11 1
I
y
it
DELIVER TU ADDRETSEE ONLy
WtUIAL UELIVERY (extra fee required) . . . . . . . . . . . .
.4 PS'Form NO INSURANCE COVERAGE PROVIDED —
A 3800 (See other side)
p . 1971 NOT FOR INTERNATIONAL MAIL GPO: 1070 0-307.4tiO
o
�Ln "'n' co,
T 0.
0,
cn, :"En:0
in rn
0!
�Z' ic:>�
—0
1 4::j
Z
C,
.0
0
ro U),
.7
'01
m
"a
41
A S Im, cd
T <
!Hj'.(a)t 44
to
0
� :� , 4-:� t
ca ,
Q
W
cr
c
.0 0
�94
-HI
co"
a)
:<
cd >-
4,
W,
il
i .
Z
0
9!
W,
bm
Z 0.
�0'
W,
L)
be
�4' 4L)
a.,
>
-j
E
W
'0 >
"O"N" 'rn
Q
-0;
z
w,
W"
a
0'
Q
70 0 0'
W 0 '0)
"W. r4
LU,'
>i
W";
Y '
W,
X 'X
W
W 7"
z
S
�4
or —
z
z
5,
< t:t4.W't<-0
�111'
QW:
NOTICE:*
71 r
N the attached
The information shown on tY 01
piled for use by the C1
map(s) was coM '
Edmonds/ its Empl-oyees and Consultants.
nt the
Th,e C ty of 'Edmonds does. not warra
on these
accuracy of anything set for.th
M a p ('s"'). A n . y person or entity -requesting a
copy should conduct an independent
1nfbrrn'ation shown-c
Inquiry regarding the
tT�e -m a p (S) / including, but not i'mited to,
-er stub shown. SU(
the location of any sew
sewer stubs may or may' not e.xist and ma�,
may not exist at the location shown.
or
r-ity of Edmond-s nor its
Neitheir the 11� ic er s *s h- a I. I b e 11 a. b-1--e f o r t- h
empjoyee-s o-r off*
information given on thi5 map(s), nor for
e-ntation provided based
3ny one repres
upon said. m a p (S'
APPLICATION
i.
The eity of Edmonds for
SIDE SEWER PERMIT EASEMENT NO - ------------------ -------------------------
NEW CONSTRUCTION REPAIRS F� LID NO - ------------------ ASMT. NO - ------------------
OWNER------------------------------------------------------------------------------------------------ CONTRACTOR
..................... ----------------------------- -- ------- PERMIT NO - --------------------
JOB ADDRESS ----
---------------------------------------------------------------------------------- LEGAL DESCRIPTION: LOT NO - -------------------------------------- BLOCK NO - ------------------------------------
NAMEOF ADDITION ---- L�7 - ---------------------------------------------------------------- ----------------------------------
-tz-y- ---\ I`Y\C�..% N--3 ----) j
J-41 IV= '," E-7�---r -
ZI
- - --- I
--
- ��J
CO
00
L?l
TF4
lEl
Approved -
DATE ... . ..... ..... . .. .. .. By..
X, 1!
E r WO 4
4�
EUT "OF
MER, PERM
Wk -SEWER DEP
TEMs Tr
P 'MIT
ER 5788
,(,,CiII: for, side sewer BEFORE covering:, -Any portion - of. the constructl
inspection Will be_provIded withf� 24 hours after requst. ��NOI`Sat., Sun., or holiday Inspection
d
�-�,kDD.RESS!�L'OUAUONi*OF.,,CONSTRUCT.IoN ...... 219.99 .... 9.�th Aveime Wes-t
. ...........................................................
7- ........................................................................
--�,P-ROI�'ERT-Y..�LEG!NLI?,DESCRIIPTION. The S-14' of the U. .6871. of Lot 9, Blodk 7,
..................................................... .......
....................................................
..� ........... ...... ........ ............................................... ...... 9
... . ..... .. ............................................ ........
TT,!'!A !.R �QQX
.............................................. .................... 0 "1 ER ANDVOR BUI IMER...�.N ..... ....... .................. . . .........
.............................
ADDR19SS ........... L. J�.-Roth,Cbnst.
............. ; .................. ...........................................................
......................... ....................................................
_�4av 13.
onjsl�,glrante& .......... ............................................... for repair and/or, connection of a side sewer to, the city sanit�ary sewer
tem ih-accoTd'a'ja'pptwiW,Clty, of; Edmonds, ordinances.
ATTI@KTION.*.Ii�-di��i6i�';,.i�'6�.TH-E FOLLOWING'
NOTE'No� 1--�-The�`,6wfieri��, of'�'the,'�property rnay obtain- a permit to construct I sewer Inside, property, line. A 116ensed'�Side Sewer Contractor must be employed. to construct
street; area. Dol not cover any, portion of sewer -before it has been, Inspected.
NOTE No; 2=A1I�WdrW.,,p�iforrne& Lin city' right-of-way requires an Invasion of Right -of -Way Permit obtkin�able from the City *Engineer's office.
N9TE� No., .3-01�ia(�, fuII,`,infci,rmaiion, regaxding, -Ordinance 1T. 16.030 and' Regulations governing side -sewers�' hen you get permit.
w
NOTE No. 4—Top,,AfTlslde�,sewer,must have at least 30 inches coverage at property line' and 12 inches Inal
It I I .. de property line; minimum grade,of 2%. No bends� In grade
han'lh� will,.be permitted
NOTE':No:r Tren t- mustbe, water settled and surfiLee of'street, restored, to original,,c6ndit ion., . Contractors sba M be resp;onsible, for I failure due A o.
': i r develbp, withl n,,one year of completion.
-0
OTE No.' I other work,,tha'n' Is, provldcd� for in permit, or.'to do,any work,.on the, main sewer'or Its appurtenances except to. in..
ithevWxe;.
....... ell
DISAPPROVED; at . ... ............ — .......... BY, Date .......... . BY Date ... * .................................. By ..................
..... ................
AIPPROVEW
............... . ......... ]BY ........ A.".-i ...... ......................................... .............................. .
.. ...... ....... ........................
Remarks:;: M'..." ........................................... ..............
V
... ........................... 7,-,-- W .. .......... .............................................................................. ........... ........... .........................................................................
4
Permii',Ij6pies, MU B
ST e. Signed By Owner of Firm Performing Construction'PRIOR To Request For Inspection
t�........................................................... : ............... .. hereby certify that. the side sewer installation, constructed underthis -permit
ner o Contracting Firm Performing Construction)
wasInstalled'i n, ace, a.nce with� allgoverning, ordinances of the city�,.of'Edmonds.
Dated, this ............................ day of ................. ........
............. ................ 19 .........
C�6ck,-BEF61LE, you dig for: Water E]; Gas-E], Telephone� Ej, Power- E], Sewer' 'F Other E] V, %/
APPUCATION
7hp,-,City of Edmonds for EASEMENT NO - --------------------------------------------
SIDE SEWER PERMff
NEW CONSTRUCTION REPAIRS E] LID NO. - --------------- ASMT. NO. .................
OVNE CONTRACTOR --------
------------------ 4--�y
. ............. ----------------------------------------- PERMIT No.,
R
JOB ADDRESS
------- �'w ---------------------------------------------------- LEGAL DESCRIPTION: LOT NO - ------------------------- ------------ BLOCK NO. - ---------------------------------
....................................................... -------------------------------------------------------- ............. ......................
NAME OF ADDITION -----------
Approved:
DATE............................................ By --------------------------------------------------- i7i7ig
Date --hp 11 7, 1977
22�o
Memo to: Dix.ccLor of Maintenance (verati.on
Public Works
From: City Engineer - Assistant
Subject: Sewer Connection Charges
Legal Description:
The south 74 feet of the north 687 feet of lot 9, block 7, Plat of Alderwood
Manor No. 91, as recorded in records of Snohomish County, Washington
Commonly known as: 21909 96th Avenue W. Owner: William J. Hecox
Z.F.F. Calculation:
(85.2S Z-F-F- x �5.50/Z.F.F.=
Lateral X
Unit x $25
CC: owner
$ 468.88 Copnection Fee
$ Lateral Charge
$ 2S.00 Trunk Charge
$ 10.00 Permit
503.88 TOTAL
Assistant.City Engineer