Loading...
21910 HIGHWAY 99.PDF11111111111111 11581 21910 HIGHWAY 99 g, Pic eng neer n Dick's.Drive In 220' Street SW & Highway 99 City of Edmonds, WA Stormwater Site. Plan February 11, 2011 Revised March 31, 2011 The information contained in this report was pr6pared by and under the direct supervision of the undersigned: AN Laurie J. PFarr, PE. 1LPD 15ngineering, PLLC 7936 Seward Park Avenue South Seattle,WA 98118 (206) 725-1211 Prepared for: Dick's Drive In Restaurants 44262 "d Avenue NE Seattle, WA 9810 Contact: Ken Frazier '(206) 634-0300 g 1p, engineerin TABLE OF CONTENTS Stormwater Site Plan Dick's Drive In March 31, 2011 Section I — Project Overview ............................................................................................................................ I Section 2 — Existing Conditions Summary ...................................... I ................................................................. I Section3 — Offsite Analysis ................................................................................................................................. 2 Section 4 — Site Classification .............................................................................................................................. 4 Section 5 — Permanent Stormwater Control Plan ......................................................................................... 6 Section 6 — Construction Stormwater Pollution Prevention Plan ............................................................. 9 Section 7 — Other Reports and Studies ......................................................................................................... 10 Section8 — Other Permits ................................................................................................................................ 10 Section 9 — Operation and Maintenance Manual ......................................................................................... 10 Section 10 — B ond Quantities Worksheet .................................................................................................... I I FIGURES Figure 1: Vicinity Map Figure 2: Existing Conditions Figure 3: Downstream Drainage Course Figure 4: Proposed Conditions Figure 5: Proposed Conditions — Replaced PGIS Areas APPENDICES Appendix A - Design Documents Appendix B - Design Calculations and Supporting Information Appendix C - Other Reports and Studies Appendix D - Operations and Maintenance Recommendations I I I I in INTRODUCTION Stormwater Site Plan Dicles Drive In March 31, 2011 This Stormwater Site Plan has been prepared for the proposed development of a Dick's Drive Inn Restaurant located on parcel#00580700004008 along Highway:99, in the City of Edmonds. The City of Edmonds Chapter 18.30 Edmonds Community Development Code and Exhibit "A" Stormwater Supplement dated April 2010 were used forthe design of the stormwater facilities. SECTION I -PROJECT OVERVIEW The existing project site consists of an asphalt parking area with several landscape planter islands. The project is located in the northeast portion of the asphalt parking lot for TOP Foods Grocery Store. Currently, there is no address as ' sociated with the parcel number; however, for reference the TOP Foods Grocery Store is located at 21900 Highway 99, in the City of Edmonds. Refer to Figure I Vicinity Map for the location of the project. The proposed project will include the construction of a restaurant facility located on the west portion of the site. The restaurant facility will consist of a full kitchen with associated storage areas,'a covered outdoor service area and separate restrooms for employees and customers. There will be no inside seating for patrons. Limited improvements will be made within the existing asphalt parking area on the east side of the site. These improvements will include restriping of parking stalls and the construction of several planter areas. Stormwater runoff from the new/replaced impervious surfaces will be managed by a bioretention area and the existing detention facility located underneath thel asphalt parking area in the central portion of the site. This detention facility was constructed in 1991 and provides flow control for both the TOP Foods site and the project site. SECTION 2 - ExiSTING CONDITIONS SUMMARY Research of the subject property was based upon the design drawings for the TOP Foods Grocery Store that were obtained from the City of Edmonds. The drawings show utilities I within and near the subject property. Additionally, a site visit was conducted to verify existing conditions and locate existing utilities. Refer to Figure 2 for a layout of the existing conditions. The existing conditions consist of an asphalt parking area that is associated with the TOP Foods Grocery Store. The TOP Foods building is located to the southwest of the project site. Along the north boundary of the site is one of the main parking lot entry drives for TOP Foods. Along the east boundary of the site, beyond the east edge of the parking lot, Page I en,gineenn I, Stormwater Site Plan Dicles Drive In March 31, 2011 there is a grass lined biofiltration Swale that flows north and discharges into the existing public drainage system within Highway 99. East of the biofiltration swale is the public sidewalk along the west side of Highway 99. Along the south side of the site there is a second parking lot entry drive that, provides access to the site and TOP Foods. Along the southwest and west portions of the site, the existing conditions consist of the main asphalt parking area for TOP Foods. Highway 99 is located along the east side of the project site. The site generally slopes down from northwest to southeast at approximately 2 percent, with a low point located within the east portion of the site. There are no steep slopes or erosion hazard areas located within the site. Per the City of Edmonds Soil Map (Figure B-2 of the stormwater manual), the site soils consist of Alderwood Urban Land Complex, 2 to 8 percent slopes. A Geotechnical Report has been prepared by Geotech Consultants, dated February 10, 2011. This investigation found the soils within the site to be very dense to dense silty sand and dense sandy gravel fill within the area of improvements. There is an existing underground detention vault located within the project site that was constructed with the TOP Foods development. The underground vault provides stormwater detention for the runoff from the TOP Foods building and the associated asphalt parking lot surrounding the building. The inside dimensions of the existing vault are 44 feet wide and 200 feet long, with an internal height of 5.75 feet. According to the design drawings, there is approximately 0.75 feet of cover between the top of the vault lid and surface elevation of the asphalt parking lot. The detention facility discharges runoff into a biofiltration ' swale west of Highway 99 on the TOP Foods parcel. Stormwater that flows through the s,.�ale is collected by an 18-inch pipe which also collects overflow from the detention vault, and connects to the existing public storm drainage system located within Highway 99. For a complete description of the downstream drainage course refer to Figure 3 and Section 3 of this report. SECTION 3 — OFFSITE ANALYSIS The downstream drainage course has been investigated from the site to the receiving waters of Lake Ballinger, which is located approximately one mile downstream of the site. The downstream investigation was conducted on February 7, 2011, on an overcast day with a temperature of approximately 45 degrees Fahrenheit. Per the City of Edmonds Watersheds map, Figure B-1 of the stormwater manual, the site is located within the Halls Creek Drainage Basin. The Halls Creek Basin is tributary to the Lake Ballinger Basin located to the south. Stormwater from the project site is ultimately tributary to Lake Ballinger, via Halls Creek. A storm drainage map for the drainage systems within Highway 99 and 216 th Street SW has been obtained from the City of Edmonds and is included in Appendix A. Refer to Figure 3 for a layout of the downstream drainage course from the project site. Page 2 Stormwater Site Plan DicWs Drive In March 31, 2011 eenng Rp Upstream Basin The upstream basin tributary to the project site consists of portions of the asphalt parking area located to the west and south of the project. The runoff from this area sheet flows onto the project site, and is collected by the two existing catch basins located east of the project site. These catch basins convey the flow into the existing detention facility located underneath the parking area. In the proposed conditions a curb will be constructed along the west boundary of the site, with a new catch basin located at a low point to collect the runoff from the upstream basin. The catch basin will connect into the proposed conveyance system that discharges into the existing detention vault. Downstream Drainage Course The outlet from the flow control structure located within the existing detention vault discharges to the east via an 18-inch CMP pipe. The pipe daylights into the biofiltration swale along the east side of the project site. During the time of the investigation, there was a visible flow of stormwater discharge through the swale. The swale hows north and is collected by an 18-inch concrete pipe that continues north into a catch basin located at north end of the swale. The catch basin combines flows from the swale, the overflow from the detention vault, and the flowcollected by two catch basins in the north entry drive. The combined flow from the catch basin connects with the existing drainage system located in the west side of Highway 99. From this point the downstrearri drainage course is as follows: * The flow continues east to a catch basin located within the gutter flow line along the east side of Highway 99. The drainage system along the east side of Highway 99, continues north through a series of catch basins and pipes. Due to the location of the catch basins within the roadway, the size of pipes could not be determined. However flowing water within the catch basin was observed through the grate. • Near the intersection of Highway 99 and 216 1h ' Street SW, the drainage system consists of solid locking lids located within the travel lane. The location of the system was consistent with the storin drainage map provided by the City of Edmonds. • The drainage system continues east along the south side of 216 th Street SW for approximately 500 feet. • The drainage system continues south and discharges into Halls Creek. Due to the steep side slopes and heavy vegetation the outfall of the drainage system could not be verified. There was no observed flooding or erosion within the approximate area of the outfall. The outfall into Halls Creek is located approximately 1,550 feet downstream from the project site. • Halls Creek continues south within a vegetated channel and through various culvert crossings underneath roadways. Halls Creek eventually discharges to Lake Ballinger, located approximately 7,700 feet (1.5 miles) downstream from the project site. Page 3 IN g Ipc eenn Stormwater Site Plan Dicles Drive In March 31, 2011 During the time of the investigation there was no evidence of flooding or overtopping of the existing drainage system. SECTION 4 - SITE CLASSIFICATION/MINIMUM REQUIREMENTS The project has been classified per Section 2 of the 2010 Edmonds Stormwater Code Supplement (ESCS). The project proposes to add/replace approximately 10,310 square feet of new impervious surface and will have approximately 12,606 square feet of land disturbing activity. Refer to Figure 4 — Proposed Conditions. Per Figure 2-1 of the ESCS, the site is classified as a Category 2 Small Site Project. Below is a list of all the Small Site Minimum Requirements (SSMR) that apply to the project. SSMR 91: Preparation of Stormwater Site Plan Complete site plans that show the existing and proposed conditions of the project and drainage systems are included. This Stormwater Site Plan summarizes the methods and analysis in the design of the stormwater components for during and after construction. SSMR #2: Construction Stormwater Pollution Prevention The Construction Stormwater Pollution Prevention Plan (SWPPP) is a combination of the Temporary Erosion and Sediment Control (TESC) Plan and a Stormwater Spill Prevention Plan (SSPP). Per Section 5.2 of the ESCS, since the project is classified as a small site, only a TESC Plan is required. The TESC Plan is sheet C 1. 0 of the drawings. SSMR #3: Source Control of Pollution Per Volume IV of the 2005 DOE Manual, for restaurants and fast food businesses the potential pollutant sources include the customer parking lots and garbage dumpsters. The existing flow control structure located within the underground detention vault fimctionsas an oil/water separator to provide pollution control for runoff from the impervious surface associated with the parking lot. The garbage dumpster area has been enclosed to prevent stormwater entering this area. The dumpster area has also been isolated such that any leakage from the dunipsters will be routed to a drain connected to the sanitary sewer. No washing of restaurant equipment, such as cooking vent filters, will be allowed within in any area draining to the stormwater system. SSMR #4: Preservation of Natural Drainage Systems and Outfalls Runoff from the existing project area currently sheet flows southeast to a low point within the asphalt parking area. A catch basin collects and conveys the runoff into the underground detention vault. The detention vault discharges into the biofiltration swale located along the east side of the site. Page 4 Stormwater Site Plan DicWs Drive In March 31, 2011 en ineering p c .......... In the proposed conditions, runoff from the proposed building and replaced impervious surface will be routed to the existing underground detention facility. The, discharge from the detention facility will remain unchanged and match the existing conditions. SSMR #5: Onsite Stormwater Management In accordance with Section 3.1 of the ESCS, small sites are not required to consider or use LID techniques (on -site stormwater management BMPs). However, because the project site is tributary to Lake Ballinger, LID has been considered to reduce the amount of runoff from the project. The project proposes the use of a bioretention area along the north, side of the building to collect roof runoff from the building. Refer to Section 5 for a complete description of the bioretention facility. SSMR #6: Runoff Treatment The project proposes approximately 4,438 square feet of pollution, generating impervious surface. Refer to Figure 5 included with this Report, for a layout of the New/Replaced PGIS Areas associated with the project. Per Section 5.6.1 of the ESCS, since this area is less than 5,000 square feet, the site will not require runoff treatment BMPs. SSMR #7: Flow Control Per Figure B-1 from the 2010 ESCS, the project is located in the Halls Creek drainage basin, which is tributary to Lake Ballinger. The total new'and replaced impervious surface area associated with the project is 10,3 10 square feet. The bioretention area will provide mitigation of stormwater runoff from the roof of the building. Runoff from the remaining replaced impervious surface will continue to be mitigated by the existing detention vault; based upon the construction drawings of the detention vault, the City determined ' that the vault can be used for SSMR#7 Flow Control for the replaced impervious associated with the project. A complete description of drainage system is provided in Section 5 of this Report. SSMR #8: Wetlands Protection There are no wetlands located within the site or associated with the project. SSMR #9: Operation and Maintenance Operation and Maintenance guidance from Volume III of the 2005� Stormwater Management Manual for Western Washington, for the onsite flow control BMPs are included in Appendix C this report. SSMR #10: Offsite Analysis Refer to Section 3 of this Report for the offsite analysis description. Page 5 N Ngoengineenn P c Stormwater Site Plan Dicles Drive In March 31, 2011 SSMR #11: Financial Liability The project is a commercial project, which would normally require that a performance bond be posted as a financial guarantee for the required stormwater systems and BMPs related to the Construction Stormwater Pollution Prevention Plan. However, there are no proposed improvements in the public right of way; therefore Jeanie McConnell has indicated that the Engineering Division does not require a performance bond to be posted for this project. A Traffic Impact Analysis has been prepared by Transportation Engineering Northwest. A copy of this Analysis has'been submitted under separate cover. SECTION 5 - PERMANENT STORMWATER CONTROL PLAN 5.1 Existing Site Hydrology The existing project area consists mainly of an asphalt parking area with a few landscaped planter islands. Runoff from the existing asphalt parking area generally sheet flows southeast with slopes of approximately 2%, into the two existing catch basins located along the east side of the site. These catch basins route the runoff into the existing underground detention vault located underneath the asphalt parking area. Refer to Figure 2 — Existing Conditions. 5.2 Developed Site Hydrology Per conversations with the City of Edmonds, the existing detention vault was designed to exceed the City's stormwater regulations that were in effect in 1991 when the TOP Foods site w ' as developed. Based upon the construction drawings of the,.detention vault, the City determined that the vault can be used for SSMR#7 Flow Control for the replaced impervious associated with the project. In the proposed conditions, the building will be constructed on the western portion of the site. The roof drains from the building will be routed toward the north side of the building and will discharge to the surface from a downspout at the north building comer. A channel will be located within the walkway to direct the downspout runoff into the bioretention area located along the north side of the building. The proposed bioretention area provides additional flow control to reduce the amount of runoff from the project site. The bioretention area will be located along the north side of the building and collect runoff from the building roof area. The under -drain and overflow from the bioretention area will discharge into the existing detention vault. The remaining runoff from the replaced impervious surfaces will discharge into the existing detention vault. Page 6 Stormwater Site Plan Dicles Drive In March 31, 2011 g Pic engin Runoff from the concrete access drive lane along the west side of th6 building will be collected by a trench drain. The runoff will be conveyed east and discharged directly into the existing detention facility. The stormwater runoff from the remaining parking area located on the east portion of the site will be collected by the existing catch basins within the parking area. The catch basins will route the runoff into the existing detention vault. Refer to Figure 4 — Proposed Conditions. 5.3 Performance Standards and Goals Although the project is not required to provide additional performance standard beyond the use of the existing detention system, the project proposed to meet the 2010, ESCS detention BMPs flow control standards for the building. This was accomplished by providing bioretention designed to these standards. The project is located within a Lake/Creek Basin, and peak flows have been designed not to exceed 0.07, 0.14 and 0.33 cfs per acre of impervious surface area for the 2, 10 and 100 year storm events, respectively. 5.4 Flow Control System As described earlier in this Section, the existing detention vault was determined to provide flow control that is equivalent to the current City of Edmonds flow control standards. The City has indicated that runoff from replaced impervious surfaces may continue to be routed to the existing stormwater detention system without modifications. However, a bio- retention area is proposed to further mitigate the replaced impervious surfaces associated with the project in addition to the existing detention facility. The proposed bioretention area will be located along the north side of the building and will mitigate storrnwater collected from the entire building roof s runoff. Since the onsite soils are classified as till and do not promote good infiltration, an under -drain will be provided within the bioretention area. The bioretention facility will consist of a 12-inch of ponding depth and an 18-inch layer of bioretention soil mix. The under -drain will be located within a 12-inch gravel layer underneath the bioretention soil. An overflow draini� will also be provided within the bioretention area and will discharge the flow into the existing detention vault. Western Washington Hydrologic Model Version 4 (WWHM4) with "Puget East 36" precipitation time series was used in the sizing of the bioretention area per Section 5.7.3.1 of the ESCS. A complete'copy of the output from the program is included in Appendix B of this Report. The -tot al area of impervious surface tributary to the bioretention area is 5,086 square feet (0.11 acres). Below is a summary table of the allowable release rates per the City of Edmonds and the release rates from the bioretention facility. I I Page 7 g Pic engineenn Table I — Bioretention Area Release Rates 'Return Period Allowable Release Rates (cfs) Actual R61ease.Rates frorn Bioretenti6nArea (cfs). 2-year 0.007 0.006 1 0-year 0.015 0.013 I I 00-year F- 0.036 0.030 Stormwater Site Plan Dicles Drive In March 31, 2011 The runoff from the remaining 5,224 square feet of replaced impervious surface associated with the project site disturbance will discharge directly into the existing detention vault. 5.5 Water Quality System I The project proposes approximately 4,438 square feet of new or replaced pollution generating impervious surface. Per Section 5.6.1 of ESCS, since this area is less than 5,000 square feet the site will not require runoff treatment BMPs. Refer to Figure 5 for a layout of the new and replaced PGIS areas associated with the project. 5.6 Conveyance System Analysis and Design The proposed conveyance system will convey runoff from the concrete access lane along the west side of the building, and the discharge from the bioretention area, as well as the runoff from the upstream parking area that is collected in the catch basin next to the proposed planter island west of the building. The conveyance system will connect into the existing detention vault located underneath the parking area. The proposed conveyance system has been analyzed to convey the developed 100-yeiar flow from the total replaced impervious surfaces and the upstream area which is 0.356 cfs. Using the Manning's Equation, the full capacity of a 6-inch pipe at 2.0% slope was determined to be 0.86 cfs. The 6-inch conveyance system Will have adequate capacity to convey stormwater runoff from the developed replaced impervious surfaces associated with the project. Page 8 1�11engin g , , Stormwater Site Plan Dicles Drive In March 31, 2011 SECTION 6 — CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN The Construction Stormwater Pollution Prevention Plan (SWPPP) is a combination of the Temporary Erosion and Sediment Control (TESC) Plan and a Stormwater Spill Prevention Plan (SSPP). Per Section 5.2 of the ESCS, since the project is classified as a small site, only a TESC Plan is required. The TESC Plan is sheet C1.0 of the drawings. The following twelve elements have been addressed in the Construction Stormwater Pollution Prevention Plan and on the TESC Plan: I . Mark Clearing Limits — Clearing limits will be defined by erosion control components and/or construction fencing as necessary. 2. Establish Construction Access — The existing asphalt parking area will be retained and used as a construction access. As portions of the asphalt area are removed, quarry spalls will be provided until the final surfacing is installed. 3. Control Flow Rates — Stormwater flow runoff during construction is anticipated to be mitigated by pumping runoff from the building excavation to a temporary sediment settling tank. The outlet from the sediment settling tank will discharge into the existing drainage system within the asphalt parking area. 4. Install Sediment Controls — Sediment will be controlled using catch basin inserts within existing catch basins within the project site. Additionally, compost filter socks and triangular silt dikes will be used to limit the amount sediment runoff from the existing asphalt parking area. (See TESC, Sheet C1.0 and Details, Sheet C1.1). 5. Stabilize Soils — It is anticipated that some of the earthwork and grading may occur in wet weather conditions. Exposed soils will be protected by approved coverage (plastic sheeting, straw mulch, hydroseeding, etc.) within seven days during the dry season, and within 2 days during the wet season. 6. Protect Slopes — Exposed slopes will be protected by approved coverage (plastic sheeting, straw mulch, hydroseeding, etc.) within seven days during the dry season, and within 2 days during the wet season. 7. Protect Drain Inlets — Existing catch basins will have inlet protection installed prior to site disturbance. 8. Stabilize Channels and Outlets — This element does not apply to this project since ' there are no channels or point discharges of stormwater proposed. - 9. Control Pollutants — Temporary protection of the disturbed soils provides the first level of protection for pollution control and perimeter measures downstream, as well as the sediment settling tank, will mitigate the remaining pollutants. 10. Control De -watering — De -watering will be pumped to an approved sediment settling facility prior to discharge. 11. Maintain BMPs — The BMPs will be maintained regularly in accordance with the Erosion and Sedimentation Control Plan and Notes. At the owner's request, LPD Engineering will also make periodic site visits to observe the erosion and sedimentation control facilities. 12. Manage the Project — The Contractor will maintain a daily presence on the site and will assign a contact person for erosion and sedimentation control issues. Page 9 * engineering P Stormwater Site Plan Dicles Drive In March 31, 2011 BMPs will be in accordance the Stormwater Management Manual for Western Washington and City of Edmonds standards unless otherwise noted here or in the drawings. The contractor will be responsible for monitoring and maintaining the erosion control on site as the project progresses. It is anticipated that some earthwork may occur during wet weather conditions and construction will continue into the dry season. Due to work in the wet season, care will be taken to limit impact to the'existing paved surfaces for use during construction and protect disturbed soils. Stormwater runoff from the proposed project area will be collected and pumped to a temporary sediment settling facility before being discharged into the existing drainage system. The temporary sediment settling facility was sized per the Stormwater Management Manual for Western Washington. Using the WWHM program, the 2-year flow rate of 0.057 cfs from unmitigated replaced impervious surfaces was used to size the temporary sediment settling facility. The total required sediment storage volume is 416 cubic feet (178 cf dead storage plus 238 cf sediment settling volume). The proposed storage volume provided by the temporary sediment settling tank is 535 cubic feet (4,000 gallons). SECTION 7 - OTHER REPORTSAND STUDIES The following reports and studies are associated with the project. Geotechnical Report by Geotech Consultants, dated February 10, 2011. A copy is included in Appendix C of this Report. A Traffic Impact Analysis has been prepared by Transportation Engineering Northwest. A copy of this Analysis has been submitted under separate cover. SECTION 8 - OTHER PERMITS At this time there are no additional permits associated with this project. SECTION 9 - OPERATION AND MAINTENANCE MANUAL An Operation and Maintenance Manual for the. onsite stormwater features is included in Appendix D of this Report. Page 10 Stormwater Site Plan Dicles Drive In March 31, 2011 eering Ipc SECTION 10 - BOND QUANTITIES WORKSHEET A bond quantities worksheet will not be required since there are no proposed improvements within the right-of-way. Per the City of Edmonds, an itemized cost estimate has been submitted under separate cover. Page I I Stormwater Site Plan DicWs Drive In Ipc eering March. 31, 2011 FIGURES Figure 1: Vicinity Map Figure.2: Existing Conditions Figure 3: Downstream Drainage Course Figure 4: Proposed Conditions Figure 5: Proposed Conditions — Replaced PGIS.Areas Z� 41 2—a7N �z � 208N ST SW 2081-H R sp, 2 TH sw �O9 T 210TH ST SW :;�2107H S7- SW _E� —A, ST SW 212TH ST 212TH ST SW "213NA 213TH ST SW 213TH RZ SW 2141-H R sw 2147h W PROJECT 215TH ST SW c 2,.�)—ypzsiy SITE C, sw 21 S7, slwy =21sw SW S, 218N SW - 2MTH ST SW M 220)TY ST 220TH ST S)Y 2207H ST SW Tw % 220TH R SW P4pl 221ST R SW 1ST R SW 221ST ST SW J� 222ND 222AD ST SW �k R221 N TH ST SW ST S;Y, ZEE 224 225TH R SW NR 225TH . 225TH R SW R SlY 226TH ST SW 2267H 22,67H sw 9 SW ::,E 2297H R SW —NST 2�7 SW 2281-H 2287H ST SW 2291-9 ST SW �L4 pt, PIZ 229TH R SM 230TH ST SW DON St 9 23 sw N ZIE 212NO ST 2,12ND sw ::'E �ZTMD A SW C20 Engineering PLLC ::Drivel- n- I Igoengin p APPENDIX A Design Documents. Stormwater Site Plan Dicles Drive In March 31, 2011 I Igoenginee.rin p APP ENDIX B Design Calculations and Supoorting Information Stormwater Site Plan DicWs Drive In March 31, 2011 WWBM4 PROJECT REPORT Project Name: RainGarden Site Name Dick Drive In . Site Address: 220th and HWY 99 'City City of Edmonds Report Date 2/10/2011 MGS Regoin Puget East Data Start 1939/10/1 Data End 2060/09/30 DOT Data Number: 03 Version : 2010/12/01 PREDEVELOPED LAND USE Name ' : Basin 1 Bypass: No GroundWater: No Pervious Land Use Acres C, Forest, Flat .11 Impervious Land Use Acres Element Flows To: Surface . Interflow MITIGATED LAND USE Name I : Dev-Roof Bypass:. No GroundWater: No Pervious Land Use Impervious Land Use ROOF TOPS FLAT Acres Acres 0.11 Groundwater Element Flows To: Surface Interfl6w Groundwater- RainGarden Surfaceen RainGarden Surfaceen Name. : RainGarden Bottom Length: 11.00 ft. Bottom Width : 11.00 ft. Trench bottom,slope 1: -0.001 To 1 Trench Left side slope- 0: 3 To 1 Trench right side slope 2: 3 To 1 Material thickness of first layer : 1.5 Pour Space of material for first layer Material thickness of second layer : 1 Pour Space of material for second layer Material thickness of third layer 0 Pour Space of,material for third layer Discharge Structure Riser Height: 1 ft. Riser Diameter: 6 in. Element Flows To: Outlet 1 . . Outlet 2 0.39 0.4 0.4 Landscape -Swale Hydraulic Table Stage(ft) Area(ac) Volume(ac-ft) Discharge(cfs) Infilt(cfs) <Table removed to conserve paper> Name : RainGarden Surfaceen Bottom Length: 0.00 ft. Bottom Width : 0.00 ft. Material thickness of first layer 0 Pour Space of material for first layer Material thickness of second layer : 0 Pour Space of.material for second layer Material thickness of third layer : 0 Pour Space of material for third layer Discharge Structure Riser Height: 0 ft. Riser Diameter: 0 in. Element Flows To: Outlet 1 Outlet 2 RainGarden 0 LSplitter Hydraulic Table Stage(ft) Area(ac) Volume(ac-ft) Discharge(cfs) Infilt(cfs) <Table Removed to conserve paper> ANALYSIS RESULTS I I Flow Frequency Return Periods for Predeveloped. POC #1 Return Period Flow(cfs) 2 year 0.001879 5 year 0.003083 10 year 0.003761 25 year 0.004464 50 year 0.004888 100 year 0.00524 Flow Frequency Return Periods for Mitigated. POC #1 Return Period Flow(cfs) 2 year 0.006383 5 year 0.010047 10 year 0.013385 25 year 0.018913 50 year 0.024184 100 year 0.030637 Annual Peaks for Predeveloped and Mitigated. POC #1 Year Predeveloped Mitigated <Yearly Peaks removed to conserve paper> Ranked Annual Peaks for Predeveloped and Mitigated. POC #1 Rank Predeveloped Mitigated <Ranked Peaks removed to conserve paper> POC #1 Facility FAILED duration standard for 1+ flows. Flow(cfs) Predev Mit Percentage Pass/Fail <Durations removed to conserve paper> The development has an increase in flow durations from 1/2 predeveloped 2 year flow to the 2 year flow or more than a 10% increase from the,2 year to the 50 year flow. The development has an increase in flow durations for more than 50% of the flows for the range of the duration analysis. Water Quality EMP Flow and Volume for POC #1 On-line facility volume: 0.0047 acre-feet On-line facility target flow: 0.01 cfs. Adjusted for 15 min: 0.0077 cfs. Off-line facility target flow: 0.0048 cfs. Adjusted for 15 min: 0.0054 cfs. Perind and Impind Changes No changes have been made. This program and accompanying documentation is provided I as -is I without warranty of any kind. The entire risk regarding the performance and results of this program is assumed by the user. Clear Creek Solutions, Inc. disclaims all warranties, either expressed or implied, including but not limited to implied warranties of program and accompanying documentation. In no event shall Clear Creek Solutions, Inc. be liable for any damages whatsoever (including without limitation to damages for loss,of business profits, loss of business information, business interruption, and the like) arising out of the use of, or inability to use this program even if Clear Creek Solutions, Inc. has been advised of the possibility of such damages. WWHM4 PROJECT REPORT Project Name: TESC Sizing & Conveyance Sizing Site Name Dick Drive In Site Address: 220th and HWY 99 city City of Edmonds Report Date 2/10/2011 MGS Regoin Puget East Data Start 1939/10/1 Data End 2060/09/30 DOT Data Number: 03 Version : 2010/12/01 PREDEVELOPED LAND USE Name TESC Sizing .Bypass: No GroundWater: No Pervious Land Use Acres Impervious -Land Use Acres PARKING FLAT 0.23 Element Flows To: Surface Interflow Groundwater MITIGATED LAND USE Name : Conveyance -Sizing Bypass: No GroundWater: No Pervious Land,Use Acres Impervious Land Use Acres PARKING FIAT 0.58 Element Flows To: Surface . Interflow Groundwater ANALYSIS RESULTS Flow Frequency Return Periods for TESC Sizing. POC #1 Return Period Flow(cfs) 2 year 5 year 0.076171 10 year 0.089981 25 year 0.109058 50 year 0.124496 100 year 0.141026 Flow Frequency Return Periods for Conveyance Sizing Return Period Flow(cfs) 2 year 0.144719 5 year 0.192084 10 year 0.226909 25 year 0.275015 50 year 0.313946 100 year 0.355631 Water Quality BMP Flow and Volume for POC #1 On-line facility volume: 0.0047 acre-feet On-line facility target flow: 0.01 cfs. Adjusted for 15 min: 0.0077 cfs. Off-line facility target flow: 0.0048 cfs. Adjusted for 15,min: 0.0054 cfs. Perind and Impind Changes No changes have been made. POC # 1 This Program and accompanying documentation is provided I as-i s I without warranty of any kind. The entire risk regarding the performance and results of this program is assumed by the user. Clear Creek Solutions, Inc. disclaims all warranties, either expressed or implied, including but not limited to implied warranties of program and accompanying documentation. In no event shall Clear Creek Solutions, Inc. be liable for any damages whatsoever (including without limitation to damages for loss of business profits, loss of business information, business interruption, and the like) arising out of the use of, or inability to use this program even if Clear Creek Solutions, Inc. has been advised of the possibility of such damages. Circular Channel Analysis & Design Solved with Manning's Equation Open Channel - Uniform flow Worksheet Name: Dicks Drive In Comment: Conveyance System Sizing Solve For Full Flow Capacity Given Input Data: Diameter .......... 0.50 ft Slope ............. 0.0200 ft/ft Manning's n ....... 0.012 Discharge .......... 0.86 cfs Computed Results: Full Flow Capacity ..... 0.86 cfs Full Flow Depth ........ 0.50 ft Velocity .......... 4.38 fps Flow Area ......... 0.20 sf Critical Depth .... 0.45 ft Critical Slope .... 0.0175 ft/ft Percent Full ...... 100.00 % Full Capacity ..... 0.86 cfs QMAX @.94D ........ 0.92 cfs Froude Number ..... FULL Open Channel Flow Module, Version 3.41 (c) 1991 Haestad Methods, Inc. * 37 Brookside Rd * Waterbury., Ct 06708 Sediment Trap Sizing'Calculations Per DOE Manaul Project Name: Dick's Drive In by: BRH Required Trap Surface Area multiplier = 2 Per DOE Manaul Q = 0.057 cfs 2-year developed storm event Vsed-= 0.00096 fps SA 118.8 sf Required Dead Storage Depth = 1.5 ft Volume = 178 cf Volume SA Depth Required Live Storage Depth = 2 ft Volume = 238 cf Volume SA Depth. Total Required Storage Volume = 416 cf -Volume = 3,109 Gallons engini g P APPENDIX C Other Reports and Studies 13 Stormwater Sitb Plan Dicles Drive In March 31, 2011 OEOTECH CONSULTANTS, INC. 13256 Northeast 20th Street, Suite 16 Bellevue, Washington 98005 (425) 747-5618 FAX (425) 747-8561 February 10., 2011 JN 11016 Dick's Drive-ins, LTD 4426 — 2nd Avenue Northeast Seattle, Washington 98105 Attention: Ken Frazier via email ken@qdir.com Subject: Transmittal Letter — Geotechnical Engineering Study Proposed Dick's Drive -In Restaurant 21984 State Route 99 Edmonds, Washington Dear Mr. Frazier: We are pleased to present this geotechnical engineering report for the proposed new Dick's Drive - In Restaurant to be constructed in Edmonds, Washington. The scope of our services consisted of exploring site surface and subsurface conditions, and then developing this, report to provide recommendations for general earthwork and design criteria for building foundations and retaining walls. This work was authorized by your acceptance of our proposal, P-8091, dated January 11, 2011. The attached report contains a discussion of the study and our recommendations. Please contact us if there are any questions regarding this report, or for further assistance during the design and corIstruction phases of this project. IJ LH/D RW: jyb . *RoRespectf 'I ubmitted, es pectf I u G 0 0 ULTANTS, INC. D 0 beWaord, P.E. Principal GEOTECH CONSULTANTS, INC. GEOTECHNICAL ENGINEERING STUDY Proposed Dick's Drive -In. 21984 State Route 99 Edmonds, W ashington This report p - resents the findings and recommendations of our geotechnical engineering study for the site of the proposed new Dick's Drive-in Restaurant to.be Iodated in Edmonds. We were provided with a preliminary site plan. LPD Engineering, PLLC developed the site plan, which is dated November 30, 2010. Based on this plan and conversations with the project design team, we understand that the proposed project will consist of constructing a one-story commercial building in the northeastern corner of the existing parking -lot, which is currently used by the Top Foods grocery store. This restaurant building site is planned to be constructed near to, just below the existing site grades, requiring only minimal excavation work. Notably, the new building will be located near an existing, below grade stormwater detention vault. The eastern wall of the new building is planned to be constructed about 1.5 feet west of the western vault wall. If the scope of the project changes from what we have described above, we should be provided with revised plans in order to determine if modifications to the recommendations and conclusions of this report are warranted. SiTE CONDITIONS SURFACE The Vicinity Map, Plate 1i illustrates the general location of the site in Edmonds. -The Top Food facility site is located on the. northeastern side of the intersection at State Highway 99. and 220th Street Southwest. The proposed Dick's Drive -In building and parking will be located in the northeastern corner of the existing facility where a parking lot currently exists. The existing parking lot in this area is -relatively level, sloping gently down to the east. The overall elevation change across the project site is approximately 6 feet over about. 100 feet horizontally. The plans we received Indicate that the vault slab is at elevation 350.5 feet. SUBSURFACE The subsurface conditions were explored by drilling three test borings at the approximate locations shown -on the Site Exploration Plan, Plate 2. Our exploration program was based on the proposed construction, anticipated subsurface conditions and those encountered during exploration, and the scope of work outlined in our proposal. The borings were drilled on January 26, 2011 using a truck -mounted, hollow -stem auger drill. Samples were taken at 5-foot intervals with a standard penetration sampler. This split -spoon sampler, which has a 2-inch outside diameter, is driven into the Soil with a 140-pound hammer failing 30 inches. The number of blows required to advance the sampler a given distance is an indication of the soil density or consistency. A geotechnical eng'Ineer from our staff observed -the drilling process, logged the test borings, and obtained representative samples of the soil encountered, The Test Boring Logs are attached as Plates 3 through 4. GEOTECH CONSULTANTS, INC. Dick's Drive -In February 10, 2011 Soil Conditions JN 11016 Page 2 The native silty sand was very dense beneath the existing pavement in the two test borings drilled away from the stormwater vault, However, Test Boring 1, conducted approximately 4.0 feet east of the western foundation wall of the detention vault at this location revealed approximately 6 feet of medium -dense to dense, sandy gravel fill. The fill appeared well compacted as structural fill. Beneath the previously placed structural fill, the dense to very dense silty sand soil's were encountered. These dense native -soils were encountered to the maximum depth explored of 11.5 feet.. These silty sands,were also found in the soils investigation performed by Terra'Assoclates for.the previous development of the Top Foods grocery store, Based on our review of the Top Foods grocery store :co.nstru'ction documents, the area proposed for the new Dick's Drive-in was likely excavated to reach the existing grades during previous parking lot construction. No obstructions were revealed by our explorations. However, debris, buried utilities, and old foundation and slab elements are commonly encountered on sites that have had previous development. Groundwater Conditions No groundwater -seepage was observed in our explorations. The test borings were left open for only 'a- short time period. 'therefore, the seepage levels on the logs represent the location of transient water seepage and may not indicate the statlG groundwater level. Groundwater levels encountered during drilling can be deceptive, because seepage into the boring can be blocked or slowed by the auger itself. It should be noted that groundwater levels vary seasonally with rainfall and other factors. It is possible that groundwater could be found perched on dense native soil. The stratification lines on the logs represent the approx imate boundaries between soil. types at the exploration locations. The actual transition between soil types may be gradual, and subsurface conditions can vary between exploration locations. The logs provide specific subsurface information only at the locations. tested. The relative densities and moisture descriptions indicated on the test boring logs are interpretive descriptions based on the conditions observed during drilling. CONCLUSIONS AND RECOMMENDATIONS GENERAL THIS SECTION CONTAINS A SUMMARY OF OUR STUDY AND FINDINGS FOR THE PURPOSES OF A GENERAL OVERVIEW ONLY. MORE SPECIFIC RECOMMENDATIONS AND CONCLUSIONS ARE CONTAINED IN THE REMAINDER OF THIS REPORT. ANY PARTY RELYING ON THIS REPORT SHOULD READ THE ENTIRE DOCUMENT I IGEOTECH CONSULTANTS, INC. Dick's Drive -In JN 11016 February 10, 2011 Page 3 The two test borings conducted for this study located outside of the eAsting stormwater vault area encountered very dense native silty sands With some gravel beneath the existing asphalt parking lot. The test boring drilled near the vault ' revealed medium -dense to dense structural fill overlying the dense to very dense native soil. The structural fill and the dense native soils are very well suited for.foundation support. Conventional footings can be used for the building foundations. - The most considerable geotechnical engineering concern of this project is the construction of the new building foundation near the existing detention vault. The proposed locatio * n of the eastern building wall is 1.5 feet to 2 feet west of the western wall of the existing stormwater detention vault. The structural backfill encountered in ' the test boring near the existing stormwater vault could support the new building loads with minimal differential settlement, but the eastern foundations will impose additional surcharge loads on the walls. of the detention vault. If the existing vault foundation walls cannot support any additional surcharge loads, th.e new foundation loads should be lowered to elevation 352.5. feet, about 2 feet above the vault slab. The most economical method for lowering the foundation loads would be to excavate a trench to elevation 352.5 feet and backfilling the trench with lean mix concrete up to the design footing grade. The depth of the foundation load may be raised to higher elevation depending on the structural analysis of the existing vault wall and its lateral capacity. The native silty sand is very dense at shallow depths. Beneath the existing ground surface Contains a high silt content, and has very low permeability. It is unlikely that stormwater would infiltrate into these native soils. The drainage and/or waterproofing recommendations presented in this report are intended only to prevent active seepage from flowing through concrete walls:or slabs. Even in the absence of active seepage into and beneath structures, water vapor can migrate through walls, slabs, and floors from the surrounding soil, and can even be transmitted from slabs and foundation walls due to the concrete curing process. Water vqpor also results from occupant uses, such as cooking and bathing. Excessive water vapor trapped within structures can result in a variety of undesirable conditions, including, but not limited to, moisture problems with flooring systems, excessively moist air within occupied areas, and the growth of molds, fungi, and other biological organisms that may be harmful to the health of the occupants. The designer or architect must consider the potential vapor sources and likely occupant uses, and provide sufficient ventilation, either passive or mechanical, to prevent a build up of excessive water vapor within the planned structure. Geotech Consultants, Inc. should be allowed to review the final development plans to verify that the recommendations presented in this report are adequately addressed in the design. Such a plan review would be additional work beyond the current scope of work for this study, and it may include revisions to our recommendations to accommodate site, development, and geotechnical constraints that become more evident during'the review process. We recommend including this report, in its entirety, In the project contract documents. This report should also be provided to any future property owners so they will be aware of our findings and recommendations. SEISMIC CONSIDERATIONS In accordance. with Table 1613.5.2 of the 2006 and 2009 International Building Code (IBC), the site class within 100 feet of the ground surface is best represented by Site Class Type, C (Very Dense GEOTECH CONSULTANTS, INC. Dick's Drive -In JN 11016 February 10, 2011 Page 4 Soil and Soft Rock). As noted in the USGS website, the mapped spectral acceleration value for a 0.2 second (S,,) and 1.0 second period (Si) equals 1.2g and .0.4g, respectively., The site'soils are not susceptible to seismic liquefaction because of their dense nature and the absence of near - surface groundwater. The International Building Code (IBC) states' that a site -'specific seismic study need not be performed provided that the peak ground acceleration be equal to SE)s/2.5, where SDS is determined in Section 21.2.1 of ASCE 7. Section 21.2.1 indicates that Section 11.4.7 of ASCE 7 should be used. In Equation 11.4-3 it Is noted that SDS is equal to 2/3Sms. Based on Equation 11.4-1, Sms equals F, times Ss, where. F, is. determined in Table 11.4-1. For our site, F, = 1.0. Thus, the peak ground acceleration = 0.32g. CONVENTIONAL FOUNDATIONS As discussed earlier, if no surcharge loads can be imposed on the vault, the foundation along the eastern building wall should be constructed on leani-mix concrete that extends approx! miately to elevation 352.5 feet. The base of the excavations needed where lean -mix concrete is to be placed should extend 6 inches beyond the edges of the footing, and the subgrad6 should be cleared of any loose or compressible material. The overexcavation should be backfilled. with lean -mix concrete within a few hours prior to completing the excavations to reduce the chance of sloughing or caving of the excavations. The remaining foundation portions of the proposed structure can be supported on conventional continuous and spread footings bearing on undisturbed, very dense native Soil. We recommend that the continuous and individual spread footings have minimum widths of 12 -and 16 Inches, respectively. Exterior footings -should also. be bottomed at least 18 inches -below the lowest adjacent finish ground surface for protection against frost an . d erosion. The local building codes should be reviewed to determine if different footing widths or embedment depths are required. Footing subgrades must be cleaned of loose or disturbed soil prior to pouring concrete. Depending upon s ite and equipment constraints, this may require removing the disturbed soil by hand. An allowable bearing pressure of 4,000 pounds per square foot (pso is appropriate for footings supported on competent native soil or lean mix concrete placed atop this native soil. A one-third Increase in this design bearing pressure may be used when considering short-term wind or seismic loads. For the above design criteria, it is anticipated that the total post -construction settlement of footings, founded on competent native soil, will be about 0.25 inch, with differential settlements on the order of less than one -half -inch in a distance of 50 feet along a continuous footing with a uniform load. Lateral loads due to wind or seismic forces may be resisted by fr(ction between the foundation and the bearing soil, or by passive earth pressure acting on the vertical, embedded portions of the foundation. For the latter condition, the foundation must be either poured directly against relatively level, undisturbed soil or be surrounded by level. structural fill. We recommend using the following ultimate values for the foundation's resistance to lateral loading: GEOTECH CONSULTANTS, INC. Dick's Ddve-ln February 10, 2011 Coefficient of Friction 0.50 Passive Earth Pressure 300 pcf Where: (1) pcf Is pounds per cubic foot, and (if) passive earth pressure is computed using the equivalent fluid density. JN 11016 Page 5 If the ground in front of a foundation is loose or sloping, the passive earth pressure given above will not be appropriate, We recommend maintaining a safety factor of at least 1.5 for the foundation's resistance to lateral loading, when using the above ultimate values. PERMANENT FOUNDATION AND RETAINING WALLS Retaining walls backfilled on only one side should be designed to resist the lateral earth pressures imposed by the soil they retain. The following recommended parameters are for walls that restrain level backfill: Active Earth Pressure 35 pef Passlve Earth Pressure 300 pcf Coefficient of Friction 0.50 - Soil Unit Weight 145 pcf Where: (1) pcf Is pounds per cubic foot, and (11) active and passive earth pressures are computed using the equivalent fluid pressdres. * For a restrained wall that cannot deflect at least 0.002 times its height, a uniform lateral pressure equal to 10 psf times the height of the wall should be added to the above active equivalent fluid pressure. The values given above are to be used to design only permanent foundation and retaining walls that are to be backfilled, such as conventional walls constructed of reinforced concrete or masonry. It is not appropriate to use the above earth pressures and soil unit weight to back -calculate soil strength parameters for design of other types of retaining walls, such as soldier pile, reinforced earth, modular or soil nail walls. We can assist with design of these types of walls, if desired. The passive pressure given is appropriate for the depth of level structural fill placed in front of a retaining or foundation wall only. The values for friction and passive resistance are ultimate values and do not include a safety factor. We recommend a safety factor of at least 1.5 for overturning and sliding, when using the above values to design the walls. Restrained wall soil parameters should be utilized for a distance of 1.5 times the wall height from corners or bends in the walls. This is intended to reduce the amount of cracking that can occur where a wall is restrained by a corner, GEOTECH CONSULTANTS, INC. I Dick's Drive -In February 10, 2011 JN 11016 Page 6 The design values given above do not include the effects of any hydrostatic pressures behind the walls and assume that ' no surcharges, such as those caused by slopes, vehicles, or adjacent foundations will be exerted on the walls. If these conditions exist, those pressures should be added to the above lateral soil pressures. Where sloping backfill is desired behind the walls, we will need to be given the wall dimensions and the slope of the backfill in order to provide the appropriate design earth pressures. The surcharge. due to traffic loads behind a wall can typically be accounted for by adding a uniform pressure equal to .2 feet multiplied by the above active fluid density. Heavy construction equipment should not be operated behind retaining and foundation walls within a distance equal to. the height of a wall, unless the walls are designed for the additional lateral pressures resulting from the equipment. Wall Pressures Due to Seismic Forces The surcharge wall loads that could be imposed by the design earthquake can be modeled by adding a uniform lateral pressure to the a bove-recorn mended active pressure. The recommended surcharge pressure is 7H pounds per square foot (psf), where H is the design retention height of the wall. Using -this increased pressure, the safety factor against sliding and overturning can be reduced to 1.2 for the seismic analysis. M Retalning Wall Backfill and Waterproofin Backfill placed -behind retaining or foundation walls should be coarse, free -draining structural fill containing no organics. This backfill should contain no more than 5 percent silt or clay particles and have no gravel greater than 4 inches in diameter. The percentage of particles passing the No. 4 sleve should be between 25 and 70 percent. If the native silty sand is used as.backfill, a drainage composite similar to Miradrain 6000 should be placed against the backfilled retaining walls. The drainag'e composites should be hydraulically connected to the foundation drain system.. Free -draining backfill -or gravel should. be used for the entire width of the.backfill where seepage is encountered. For increased protection, drainage composites should be placed along cut slope faces, and the- walls should be backfilled entirely with free -draining soil. The later section entitled Drainage Considerations should also be reviewed for recommendations related to subsurface drainage behind foundation and retaining walls. The purpose of these backfill requirements is to ensure- that the design criteria for a retaining wall are not exceeded because of a build-up of hydrostatic pressure behind the wall- The top 12 to 18 inches of the backfill should consist of a compacted, relatively impermeable soil or topsoil, or the surface should be paved, The ground surface must also slope away from backfilled. walls to reduce the potential for surface water to percolate into the backfill. It is critical that the wall backfill be.placed In lifts and be properly compacted, in order for the a bove-recom mended design earth pressures to be appropriate. The wall design criteria assume that the backfill will be well -compacted in lifts no thicker than 12 inches. The compaction of backfill near the walls should be accomplished with hand -operated equipment to prevent the walls from being overloaded by the higher soil forces that occur during compaction. The section entitled General Earthwork and Structural Fill contains additional recommendations regarding the placement and compaction of structural fill behind retaining -and foundation walls. GEOTECH CONSULTANTS, INC. Dick's Drive -In JN 11016 February 10, 2011 Page 7 The above recommendations are not intended to waterproof below -grade' walls, or to prevent the formation of mold, mildew or fungi in 'Interior spaces. Over time, the performance of subsurface drainage systems can degrade, subsurface groundwater flow patterns can change, and utilities can break or develop leaks. Therefore, waterproofing should be provided where future seepage through the walls is not acceptable. This typically includes limiting cold -joints and wall penetrations, and using bentonite panels or membranes on the outside of the 'walls. There are a variety of different waterproofing materials and systems, which should be installed by an experienced contractor familiar with the anticipated construction and subsurface conditions. Applying a thin coat of asphalt emulsion to the outside face of a wall is not considered waterproofing, and will only help to reduce moisture generated from water vapor or capillary action from seeping. through the concrete. As with any project, adequate ventilation of basement and crawl space areas is important to prevent a build up of water vapor that' is commonly transmitted through concrete walls from the surrounding soil', even when seepage is rot present. This is appropriate even when waterproofing is applied to the outside of foundation and retaining walls, We recommend that you contact a specialty consultant if detailed recommendations or specifications related to waterproofing design, or minimizing the potential for infestations of mold. and mildew are desired. The General, Siabs-On-Grade, and Drainage Considerations sections should be reviewed for additional recommendations related to the control of groundwater and excess water vapor for the anticipated construction. SLABS -ON -GRADE The building floois can. be con ' structed as slabs -on -grade atop the native. material, or on structural fill placed atop the native soils. The subgrade soil must be in a firm, non -yielding condition at the time. of Slab construction or undersl ' ab fill. placement. Any soft areas encountered should be excavated and replaced with select, imported structural fill. Even where the exposed soils ap pear dry, water vapor will tend to naturally migrate upward through the soil to the new constructed space above it. This can affect moisture -sensitive flooring, cause imperfections or damage to the slab, or, simply allow excessive water vapor into the space above the slab. All interior slabs -on -grade should be underlain by a capillary break or drainage layer consisting of a minimum 4-inch thickness of gravel or crushed rock that has a fines content (percent passing the No. 200 sleve� of less than 3 percent and a sand content (percent passing the No. 4 sleve) of no more than 10 percent. As noted by the American Concrete Institute (ACI) in the Guides for Concrete Floor and Slab Structures, proper moisture protection is desirable immediately below any on -grade slab that will be covered by tile, wood, carpet, impermeable floor coverings, or any moisture -sensitive equipment or products. ACI also notes that vapor retarders, such as 15-mil plastic sheeting, have been used in the past, but are now recommending a minimum 10-mil thickness. A vapor retarder is defined as a material with a permeance of less than 0.3 perms,.as determined by ASTM E 96. It is possible that concrete admixtures may meet this specification, although the manufacturers of the admixtur es should be consulted. Where vapor retarders.are used under slabs, their edges should overlap by at least 6 inches and be sealed with adhesive tape, The sheeting should ex ' tend to the foundation walls for' maximum vapor protection. If no potential for vapor passage through the. slab is desired, a vapor barrier should be used. A vapor barrier, as defined by ACI, Is a product with a water transmission rate of 0.01 perms when tested in accordance with ASTIVI E 96. Reinforced membranes having sealed overlaps can meet this requirement. GEOTECH CONSULTANTS, INC. Dick's Drive -In JN 11016 February 10, 2011 Page 8 In the recent past, ACI (Section 4.1.5) recommended that a minimum of 4 inches of well -graded compactable granular material, such as a 5/8-inch-minus crushed rock pavement'base, be placed over the vapbr retarder or barrier for their protection, and as a "blotter" to aid in the curing of the concrete slab. Sand was not recommended by ACI for this purpose. However, the use of material over the vapor retarder is controversial as noted in current ACI literature because of the potential that the protection/blotter material can become wet between the time of its placement and the installation of the slab. If the material is wet prior to slab placement, which is always possible in the Puget Sound area, it could cause vapor transmission to occur up through.the slab in the future, essentially destroying the purpose of the vapor barrierlretarder. Therefore, -if there is a potential' that the protection/blotter material will become . wet before the slab is installed, ACI *now recommends that no protectio n/b [otter material' be used. However, ACI then recommends that, because there Is a potential for slab cure due to the loss of the blotter material, joint spacing in the slab be reduced, a low shrinkage concrete mixture be used, and "other measures" (steel reinforcing, etc.) be used. ASTM E-1643-98 "Standard Practice for Installation of Water Vapor Retarders Used in Contact with Earth or Granular Fill Under Concrete Slabs" generally agrees'with the recent ACI literature. We recommend that the contractor, the project materials engineer, and the ownerdiscuss these issues and review recent ACI literature and ASTM E-1643 for installation guidelines and. guidance on the use of the protection/blotter material. The General, Permanent Foundation and Retaining Walls, and Drainage Considerations sections should be reviewed for additional recommendations related to the control of groundwater and excess water vapor for the.anticipated construction. EXCAVATIONS AND SLOPES No excavated slopes are anticipated other than for utility trenches. Excavation slopes should not exceed the limits specified'in local, state, and national government safety regulations. Temporary cuts to a depth of about 4 feet may be attempted vertically in unsaturated soil, if there are no indications of slope instability. Howeve*r, vertical cuts should not . be made near property boundaries, or existing 'utilities and structures. Based upon, Washington Administrative Code (WAC) 296, Part N, the soil at the subject site would generally be classified as Type A. Therefore, temporary. cut slopes greater than 4 feet in height. should not. be excavated at an Inclination steeper than 0.75:1 (Horizontal:Vertical), extending continuously between the top and the bottom of a cut. The above-recom mended temporary slope inclination is based on the conditions -exposed in our explorations, and on what has been successful at other sites with similar soil conditions. It is possible that. variations in soil and groundwater conditions will require modifications to the inclination at which temporary slopes can stand. Temporary cuts are those that Will remain unsupported for a relatively short duration to allow for the construction of foundations, retaining walls, or utilities. Temporary cut slopes should be protected With plastic sheeting during wet weather. It is also important that surface water be directed away from temporary slope cuts. The cut slopes -should a.lso be backfilled or retained as soon as possible to reduce the potential for instability. Please note that sand loose soil can cave suddenly and without warning, Excavation foundation, and utility contractors should be made especially aware of this potential danger. These recommendations may need to be modified if the area near the potential cuts has been disturbed in the past by utility installation, or if settlement -sensitive utilities are located nearby, GEOTECH CONSULTANTS, INC. Dick's Drive -In February 10, 2011 DRAINAGE CONSIDERATIONS JN 11016 Page 9 Foundation drains should be used where (1) crawl spaces or basements will be below a structure, (2) a slab is below the outside grade, -or (3) the outside grade does not slope downward from a building. Drains should also be placed at the base of all earth -retaining walls. These drains should be surrounded by at least 6 inches of 1-inch-minus, washed rock and then wrapped in non -woven, geotextile filter fabric (Mirafi 140N, Supac 4NP, or similar material). At its highest point, a perforated pipe invert should be at least 6 inches below the bottom of a slab floor or the level of a crawl space, and it should be sloped for drainage. All roof and surface water drains must be kept separate from the foundation drain system. A typical drain detail is attached to this report as Plate 5. For the best long-term performance, perforated PVC pipe is recommended for all subsurface drains. As a minimum, a vapor retarder, as defined in the Slabs-On-Gracle section, should be provided in any crawl space area to limit the transmission of water vapor from the underlying soils. Also, an outlet drain is recommended for all crawl spaces to prevent a build up of any water that may bypass the footing drains. No -groundwater was observed during our field work, If seepage is encountered in an excavation, it should be drained from the site by directing it through drainage ditches, perforated pipe, or French drains, or by pumping it from sumps Interconnected by shallow connector trenches at the bottom of the excavation. The excavation and site should be graded so that surface water is directed off the site and away from the tops of slopes. Water should not be allowed to stand in any area where foundations, slabs, or pavements are to be constructed. Final site grading in areas adjacent to a building should slope away at least 2 percent, except where the area is paved. Surface drains should be provided where necessary to prevent ponding of water behind foundation or retaining walls. GENERAL EARTHWORK AND STRUCTURAL FILL All building areas -should be stripped of existing asphalt pavements and any, topsoil, organic soil, and other deleterious material. The stripped or removed materials should not be mixed with any materials to be used as structural fill. Structural fill Is defined as any fill, incl * uding utility backfill, placed under, or close to, a building, behind permanent retaining or foundation walls, or in other areas where the underlying soil needs to support loads. . All structural fill should be placed in horizontal lifts with a moisture content at,Or near, the optimum moisture content. The optimum moisture content is that moisture content that results in the greatest compacted dry density. The moisture content of fill is very important and must be closely controlled. during the filling and compaction process. The allowable thickness of the fill lift will depend on the material type selected, the compaction equipment used, and the number of passes made to compact the lift. The loose lift thickness should not exceed 12 inches. We recommend testing the fill as it is placed. If the fill is not sufficiently compacted, it can be recompacted before another lift is placed. This eliminates the need to remove the fill to achieve the required compaction. The following table presents recommended relative compactions for structural fill: GEOTECH CONSULTANTS, INC. Dick's Drive-in February 10, 2011 Beneath footings, slabs 95% or 'walkways I I Filled slopes and behind 90% retainin.q walls . I 95% for upper.1 2 inches of Beneath pavements subgrade; 90% below that level Where: Minimum Relative Compaction is the ratio, expressed In percentages, of the compacted dry density to the maximum dry density, as determined In accordance with ASTM Test Designation D 1557-91 (Modified Proctor). Use of On -Site Soil JN 11016 Page 10 If grading activifies take place during wet weather, or when the silty, ori-site sail is wet, site preparation costs may be higher because of delays due to raln and the potential need to import granular fill. The on -site soil is generally silty and therefore' moisture sensitive. Grading operations will be difficult during wet weather, or when the moisture content of this soil exceeds the optimum moisture content. The moisture content of the silty, on -site soil must be at, or near, the optimum moisture content, as the soil cannot be consistently compacted to the required density when the moisture content is significantly greater than optimum. The on -site silty sand underlying the existing pavement could be used as structural fill, if grading operations are conducted during hot, dry weather, when drying the wetter soil by aeration is possible. During excessively dry weather, however, it may be necessary toadd water to achieve the optimum moisture content. Moisture -sensitive soil may also be susceptible to excessive softening and "pumping" from construction equipment,. or even foot traffic, when the moisture content is greater than the optimum moisture content-. It may be beneficial to protect subgrades with a layer of imported sand or crushed rock to limit disturbance from, traffic. A significant geotechnical consideration for development of this site is the overly moist to wet condition of the silty soils. Based on our observations, and the results of.our laboratory tests, the moisture contents of the on -site soils are significantly above the optimum moisture content necessary for the required structural fill compaction., These fine-grained, silty soils are sensitive to moisture, which makes them impossible to adequately compact when they have moisture contents even -2 to 3 percent above their optimum moisture content. The reuse of these soils as structural fill to level the site will only be successful during hot, dry weather. Aeration of each loose lift of soil will be required to dry it before the lift is compacted. Alternatively, the soil could be chemically dried by adding lime, kiln dust, or cement, provided this is allowed by responsible building department, Regardless of the method of drying, the earthwork process will be slowed dramatically. The earthwork contractor must be prepared to rework areas that don't achieve proper compaction due to high moisture content. Utility trench backfill in structural areas, such as pavements, must also be dried before it can be adequately compacted. Improper compaction of backfill in utility trenches and around control structures is a common reason for GEOTECH CONSULTANTS, INC. Dick's Drive -In February 10, 2011 JN 11016 Page 11 pavement distress and failures. Imported granular fill will be needed wherever it is not possible to dry the on. -site soils sufficiently before compaction. LIMITATIONS The conclusions and recommendations contained in this report are based on site conditions as they existed at the time of our exploration and assume that the soil and groundwater conditions encountered in the test borings are representative of subsurface conditions on the site. If the subsurface conditions encountered during construction are significantly different from those observed in our explorations, we should be advised at once so that we can review these conditions and reconsider our recommendations -where necessary, Unanticipated soil conditions are commonly encountered on construction sites and cannot be fully anticipated by merely taking soil samples in test borings, Subsurface conditions can also vary between exploration locations. Such unexpected conditions frequently require making additional expenditures to attain a properly constructed project. It is recommended that the owner consider providing a contingency fund to accommodate such potential extra costs and risks. This is a standard recommendation for all projects. This report has been prepared for the exclusive use of Dick's Drive -Ins, LTD, and its representatives, for specific application to this project and site. Our recommendations and conclusions are based on observed site materials, and selective laboratory testing and engineering analyses. Our. conclusions and recommendations are professional opinions derived in accordance with current standards of practice within the scope of our services and within budget and time constraints. No warranty is expressed or implied. The scope of our services does not include services related to construction safety precautions, and our recommendations are not intended to direct the contractor's methods, techniques, sequences, or procedures, except as specifically described in our report for consideration in design. Our services also do not Include assessing or minimizing the potential for biological hazards, such as mold, bacteria, mildew and fungi in either the existing or proposed site development. ADDITIONAL SERVICES In addition to reviewing the final plans, Geotech Consultants, Inc. should be retained to provide geotechnical consultation, testing, and. observation services during construction. This is to confirm that subsurface conditions are consistent with those indicated by our exploration, to evaluate whether earthwork and foundation construction activities comply with the general intent of the recommendations presented in this report, and to provide suggestions for design changes in the event subsurface conditions differ from those anticipated prior to the start of construction. However, our work would not include the supervision or direction of the actual work of the contractorand its employees or agents. Also, job and site safety, and dimensional measurements, will be the responsibility of the contractor. During the construction phase, we will provide geotechnical observation and testing services when requested by you or your representatives, Please be aware that we can only document site work we actually observe. It Is still the responsibility of your contractor or on -site construction team to verify that our recommendations are being followed, whether we are present at the site or not. GEOTECH CONSULTANTS, INC. Dick's Drive -In February 10, 2011 The following plates are attached to complete this report: PI ate I Vicinity Map Plate 2 Site Exploration Plan Plates 3 thru 4 Test Boring Logs Plate 5 TypIca I Footing Drain Detail JN 11016 Page 12 We appreciate the opportunity to be of service on this project. If you -have any questions, or if we may be.of further service, please do not hesitate to contact us. JLH/DRW: jyb Respectfully submitted e GEOTECHANe6� , INC. N��Dh I D. Robert Ward, P. E. Pdncipal GEOTECH CONSULTANTS, INC. wu= .'a 0 I r; a IN LIM OM) 0 0 LL CD cu W7-MIV 5�k'Ji�'j FWMA r. c U) C14 q. 00 0 C\I LLJ Ph �l r7� jpg 1L. —I F T. rd 11 Dric' 41 5� 2411 F, —41, 01� 'AN Q 4! dt 'Proposed Location of Newpullding I ) TO Existing �tormwater Detention Vault Le-gend: 0 Test boring location GEOTECH CONSUIXANTS, INC. SITE EXPLORATION PLAN 21984 State Route 99 Edmonds, Washington Job Alb: Date. plate. 111016 1 Jan. 2011 1 1 2 5 10 15 5 10 15 26 82 (11 �-) 65 50 (6") 11 00 %z BORING 1 Description 14-inches of asphalt concrete over Brown SAND with gravel, medium grained, moist, medium dense 111 FILL (Structural FILL) 2.1 -becomes very dense Light gray silty SAND with gravel, molst, very dense 3 1 -gravel lense 4 * Test boring was terminated at 11.5 feet on January 26, 2011. * No groundwater was encountered during drilling. h, "��'�V io cj� A� 50 (6") 50 60 BORING 2 Description 4-inches of asphalt concrete over Light gray, slightly silly SAND with gravel, medium grained,.moist, very dense 3 * Test boring was terminated on 11.5 feet on January 26, 2011. * No groundwater was encountered during drilling. GEOTECH CONSULTANTS, INC. TEST BOWNG LOG 21984 State Route 99 Edmonds, Washington Job Date. Logged by: Plate: 11016 1 Jan.2011 I JLH i 3 1 5 M111 15 I I 1 111:1114.11 50 (511) 50 (511) � 50 (5") 11 2 3 BORING 3 Description 4-Inches of asphalt concrete over Light gray, slightly silty SAND with gravel, fine to medium grained, moist, very dense Test boring was terminated on January 26,- 2011 at 11.5 feet. No groundwater was encount ered during drilling. GEOTECH CONSULTANTS, INC. TEST BORING LOG 21984 State Route 99 Edmonds, Washington Job Date., Logged by: Plate: 11016 1 Jan. 2011 1 AH 1 4 Slope backfill away from , foundation. Provide surface drains where necessary. .. Backfill (See text for requirements) Nonwoven Geotextile Filter Fabric Washed Rock (7/8" min. size) 4" min. Tightline Roof Drain (Do not connect to footing drain) Possible Slab 00 00 ?�p 0'0 forp 1.0 4" Perforated Hard PVC Pipe (Invert at least 6 inches below slab or crawl space. Slope to drain to appropriate outfall. Place holes downward.) Vapor Retarder/Barrier and Capillary Break/Drainage Layer (Refer to Report text) NOTES: (1) In crawl spaces, provide an outlet drain to prevent buildup of water that bypasses the perimeter footing drains. (2) Refer to report text for additional drainage, waterproofing, and slab considerations. GEOTECH CONSULTANTS, INC. FOOTING DRAIN DETAIL 21984 State Route 99 Edmonds, Washington Job A/0. Date. Plate: 5 11016 1 Jan. 2011 1 1 ?-(G�K- ST i�W- ZZ7 YAr tQOMjZ6AWDVaA1 Va-kk S-Mt-�FT Sv) 0 55 110 220 330 440 550 Storm Manholes — Contour 2ft smoothed T!T Feet m Storm Catch'BasiFs-j Edmond-s-P-arcels-2010-03 1 in= 200ft Storm Pipes No warranty of any sort, including accuracy� fitness, or merchant ability is accompany thi duct. DITCH -CREEK MrR -Dow 1,,�T r1t VMMACAT, COUP -SE Stormwater Site Plan Dicles Drive In I Igo March 31, 2011 engineenn P APkNDIX D Operations and Maintenance Recommendations No. 5 — Catch Basins Maintenance Defect Conditions When Maintenance is Needed Resulf1i Expected When Component Maintenance is pirfo�6dl General Trash & Debris Trash or debris which is located immediately in front of the catch basin opening or is blocking inletting capacity of the basin by No Trash or debris located immedi ' ately in front of catch. basin or on grate more than 10%. opening. Trash or debris (in the basin) that exceeds 60 No trash or debris in the percent of the sump depth as measured from catch basin. the bottom of basin to invert of the lowest pipe into or out of the basin, but in no case less than a minimum of six inches clearance from the debris surface to the invert of the lowest pipe. Trash or debris in any inlet or o ' utlet pipe blocking more than 1/3 of its height. Inlet and outlet pipes free of trash or debris. Dead animals or vegetation that could generate odors that could cause complaints or dangerous gases (e.g., methane). No dead animals or vegetation present within the catch basin. Sediment Sediment (in the basin) that exceeds 60 percent of the sump depth as measured from No sediment in the catch basin the bottom of basin to invert of the lowest pipe into or out of the basin, but in no case less than a minimum of 6 inches clearance from the sediment surface to the invert of the lowest pipe. Structure Top slab has holes larger than 2 square Top slab is free of holes Damage to inches or cracks wider than 1/4 inch and cracks. Frame and/or Top Slab (intent is to make sure no material is running into basin). Frame not sifting flush on top slab, i.e., separation of more than 3/4 inch of the frame from the top slab. Frame not securely Frame is sifting flush on the riser rings or top slab and firmly attached. attached Fractures or Cracksin Maintenance person judges that structure is unsound. Basin replaced or repaired to design standards. Basin Walls/ Bottom Grout fillet has separated or cracked wider than 1/2 inch and longer than 1 foot at the Pipe is regrouted and secure at basin wall. joint of any inlet/outlet pipe or any evidence of soil particles entering catch basin through cracks. Settlement/ If failure of basin has created a safety, Basin replaced or repaired Misalignment function, or design problem. to design standards. Vegetation Vegetation growing across and blocki ng more than 10% of the basin opening. No vegetation blocking opening to basin. Vegetation growing in inlettoutlet pipe joints No vegetation or root that is more than six inches tall and less than growth present. six inches apart. 4-36 Volume V — Runoff Treatment BMPs Februafy 2005 No. 5 — Catch Basins Maintenance Component Defect Conditions When Maintenance is Needed , Results Expected When Maintenance is performed Contamination and Pollution See "Detention Ponds" (No. 1). No pollution present. Catch Basin Cover Cover Not in Place Cover is missing or only partially in place. Any open catch basin requires maintenance. Catch basin cover is closed Locking Mechanism Not Working Mechanism cannot be opened by one maintenance person with proper tools. Bolts into frame have less than 1/2 inch of thread. Mechanism opens with proper tools. Cover Difficult to Remove One maintenance person cannot remove lid after applying normal lifting pressure. Cover can be removed by one maintenance person. (intent is keep cover from sealing off access to maintenance.) Ladder Ladder Rungs Unsafe Ladder is unsafe due to missing rungs, not securely -attached to basin wall, misalignment, rust, cracks, or sharp edges. Ladder meets design standards and allows maintenance person safe access. Metal Grates (if Applicable) Grate opening Unsafe Grate with opening wider than 7/8 inch. Grate opening meets design standards. Trash and Debris Trash and debris that is blocking more than 20% of grate surface inletting capacity. Grate free of trash and debris. D�amaged or Missing. MIssi g. F Grate missing or broken member(s) of the grate. I Grate is in place and meets design standards. -j No. 6 — Debris Barriers (e.g., Trash Racks) Maintenance Components Defect Condition When Maintenance is Needed Results Expected When Maintenance is Performed General Trash and Debris Trash or debris that is plugging more than 20% of the openings in the barrier. Barrier cleared.to design flow capacity. Metal Damaged/ Missing Bars are bent out of shape more than 3 inches. Bars in place with no bends more than 3/4 inch. Bars. Bars.are missing or entire barrier Bars in place according to design. missing. Bars are loose and rust is causing 50% deterioration to any part of barrier. Barrier replaced or repaired to design standards. InlettOutlet Pipe Debris barrier missing or not attached to pipe Barrier firmly attached to pipe Februafy 2005 Volume V — Runoff Treatment BMPs 4-37 I An appropriate sediment control device should be used to treat any sediment -laden water discharged from an under -drain (Low Impact Development Center, 2004). Sediment Control Erosion and sediment problems are most difficult during clearing, grading, and construction; accordingly, minimizing site disturbance to the greatest extent practicable is the most effective sediment control. Bioretention facilities should not be used as sediment control facilities and all drainage should be directed away from bioretention facilities after initial rough grading. Flow can be directed away from the facility with temporary diversion swales or other approved protection (Prince George's County, 2002). Bioretention facilities should not be constructed until all contributing drainage areas are stabilized according to erosion and sediment control BUTs and to the satisfaction of the engineer. Erosion and sediment control practices must be inspected and maintained on a regular basis. If deposition of fines occurs in the bioretention area, material should be removed*and the surface scarified to the satisfaction of the project engineer (Prince George's County, 2002). 6.1.3 Maintenance Bioretention areas require annual plant, soil, and mulch layer maintenance to ensure optimum infiltration, storage, and pollutant removal capabilities. In general, bioretention maintenance requirements are typical landscape care procedures and include: Watering. Plants should be selected to be drought tolerant and not require watering after establishment (2 to 3 years). Watering may be required during prolonged dry periods after plants are established. Erosion control. Inspect flow entrances, ponding area, and surface overflow areas periodically, and replace soil, plant material, and/or mulch layer in areas if. erosion has occurred. Properly designed facilities'with appropriate flow velocities should not have erosion problems except perhaps in extreme events. If erosion problems occur the following should be reassessed: (1) flow volumes from contributing areas and bioretention cell sizing-, (2) flow velocities and gradients within the cell; and (3) flow dissipation an ' d erosion protection strategies in the pretreatment area and flow entrance. If sediment is deposited in the bioretention area, immediately determine the source within the contributing area, stabilize, and remove excess surface deposits. Plant mat eriak Depending on aesthetic requirements, occasional pruning and removing dead plant material may be necessary. Replace all dead plants and if specific plants have a high mortality Tate, assess the cause and replace with appropriate species. Periodic weeding is necessary until plants are established. T'he weeding schedule should become less frequent if the appropriate plant species and planting density have been used and, as a result, undesirable plants excluded. Nutrient and pesticides: 'ne soil mix and plants are selected for optimum fertility, plant establishment, and growth. Nutrient and pesticide inputs should not be required and may degrade the pollutant processing capability of the bioretention area, as well as contribute pollutant loads to receiving waters. By design, bioretention facilities are located in areas where phosphorous and nitrogen levels are often elevated and these should not be limiting nutrients. If in question, have soil analyzed for fertility. 84 - LID Technical Guidance Manual for Puget Sound Mulck- Replace mulch annually in bioretention facilities where heavy metal deposition is likely (e.g., contributing areas that include parking lots and roads). .In residential lots or other areas where metal deposition is not a'concem, replace or add mulch as needed to maintain a 2 to 3 inch depth at least once every two years. Soil. Soil mixes for bioretention facilities are designed to maintain long-term fertility and pollutant processing capability.'Estimates from metal attenuation .research suggest that metal accumulation should not present an environmental concern for at least 20 years in bioretention systems (See Performance section below ). Replacing mulch in bioretention facilities where heavy metal deposition is likely proAdes an additional level of protection for prolonged performance. If in question, have soil analyzed for fertility and pollutant levels. 6.1.4 Performance Pollutant removal processes in bioretention All primary pathways for removing pollutants from storm flows are active in bioretention'systems. Schueler and Clayton (1996) list the following as the primary pathways: • Sedimentation is the settling of particulates (not effective for removing soluble components). Sedimentation occurs in the pretreatment (if provided) and ponding area of the facility. • Filtration is the physical straining of particulates (not an effective mechanism for removing soluble components). Some filtration occurs in the ponding area as stormwater moves through plants, but the soil is the primary filtering media. Pitt et al., (1995) report that 90 percent of small particles commonly found in urban storm flows (6 to 41 microns) can be trapped by an 18-inch layer of sand. Tl-.ds level of performance can be anticipated for bioretention soils typically high in sand content. • Adsorption is the binding of ions and molecules to electrostatic receptor sites on the filter media particles. This is the primary mechanism for removing soluble nutrients, metals, and organics that occur in the soil of bioretention areas as storm flows infiltrate. Adsorption increases with increased organic matter, clay, and a neutral to slightly alkaline pH. • Infiltration is the downward movement of surface water to interstitial soil water. This process initiates adsorption, microbial action, etc., for pollutant removal. • Phytoremediation processes include degradation, extraction by the plant, containment within the plant (assimilation) or a combination of these mechanisms (USEPA, 2000). Studies have shown that vegetated soils are capable of more effective degradation, removal, and mineralization of total petroleum hydrocarbons ('17PBs), polycy.chc aromatic hydrocarbons (PAHs), pesticides, chlorinated solvents, and surfactants than are non -vegetated soils (USEPA, 2000). Certain plant roots can absorb or immobilize metal pollutants, including cadmium, copper, nickel, zinc, lead, and chromium, while other species are capable of metabolizing or accumulating organic and nutrient contaminants. A University of Maryland study found significant metal accumulation in creepingjuniper plants in pilot -scale bioretention cells. Copper increased by a factor of 6.3, lead by a factor of 77, and zinc by a facto ' r of 8.1 in the tissue of junipers after receiving synthetic stormwater applications compared to pre -application tissue samples (Davis, Shokouhian, Sharma, Practices: Bioretention Areas - 85 .4 r OEOTECH CONSULTANTS, INC. Dick's Drive-ins, LTD 4426 — 2nd Avenue Northeast Seattle, Washington 98105 Attention: Ken Frazier Subject: Transmittal Letter — Geotechnical Engineering Study Proposed Dick's Drive-in Restaurant 21984 State Route 99 Edmonds, Washington Dear Mr. Frazier: 13256 Northeast 20th Street, Suite 16 Bellevue, Washington 98005 (425) 747-5618 FAX (425) 747-8561 February 10, 2011 JN 11016 via emaY ken@ddir, com We are pleased to present this geotechnical engineering report for the proposed new Dick's Drive - In Restaurant to be constructed In Edmonds, Washington. The scope of our services consisted of exploring site surface and subsurface conditions, and then developing this report to provide recommendations for general earthwork and design criteria for building foundations and retaining walls. This work was authorized by your acceptance of our proposal, P-8091, dated January 11, 2011. The attached report contains a discussion of the study and our recommendabons. Please contact us if there are any questions regarding this report, or for further assistance during the design and construction phases of this project. JLH/DRW: jyb G D-. Roberf Ward., P. E. Principal GEOTECH CONSULTANTS, INC. I TANTS, I NC. RECEIVED FEB 14 20 11 DEVRDPMENT SERVICES CTR. CITY OF EDMONDS STREET FILE I GEOTECHNICAL ENGINEERING STUDY Proposed Dick's Drive -In 21984 State Route 99 Edmonds, Washington This report presents the findings and recommendations of our geotechnlcal engineering study for the site of the proposed new Dick's Drive -In Restaurant to be located In Edmonds. We were provided with a preliminary site. plan. LPD Engineering, PLLC developed the site plan, which Is dated November 30, 2010. Based on this plan and conversations with the project design team, we understand that the proposed project will consist of constructing a one-story commercial building In the northeastern corner of the existing parking lot, which is currently used by the. Top Foods grocery store. This restaurant building site is planned to be constructed near to, just below the existing site grades, requiring only minimal excavation work. Notablyi the new building will be located near an existing, below grade stormwater detention vault. The eastern wall of the new building is planned to be constructed about 1.5 feet west of the western vault wall. If the scope of the project changes 'from what we have described above, we should be provided with revised plans In order to determine if modifications to the recommendations and conclusions of this report are warranted. SITE CONDITIONS SURFACE The Vicinity Map, Plate 1, illustrates the general location of the site In Edmonds. The Top Food facility site Is located on the northeastern side of the intersection at State Highway 99- and 220th Street Southwest. The proposed Dick's Drive-in building and parking will be located in the northeastern corner of the existing facility where 6 parking lot currently exists. The existing parking lot in this area Is relatively level, sloping gently down to the east. The overall elevation change across the project site Is approximately 5 feet over about. 100 feet horizontally. The plans we received Indicate that the vault slab is at elevation 350.5 feet. SUBSURFACE . The subsurface conditions were explored. by drilling three test borings at the approximate locations shown on the Site Exploration Plan, Plate 2. Our exploration program was based on the proposed construction, anticipated subsurface conditions and those encountered during exploration, and the scope of work outlined in our proposal. The borings were drilled on January 26, 2011 using a truck -mounted, hollow -stem auger drill. Samples were taken at 5-foot Intervals with a standard penetration sampler. This split -spoon sampler, which has a 2-inch outside diameter, is driven Into the soil with a 140-pound hammer falling 30 Inches. The number of blows required to advance the sampler a given distance is an Indication of the soil density or consistency. A geotechnical engineer from our staff observed the drilling process, logged the test borings, and obtained representative samples of the soil encountered. The Test Boring Logs are attached as Plates 3 through 4. GEOTECH CONSULTANTS, INC. Dick's Drive -In February 10, 2011 Soil Conditions JN 11016 Page 2 The native silty sand was very dense beneath the existing pavement in the two test borings drilled away from the stormwater vault. However, Test Boring 1, conducted approximately 4.0 feet east of the western foundation wall of the detention vault at this location revealed approximately 6 feet of medium -dense to dense, sandy gravel fill. The fill appeared well compacted as structural fill. Beneath the previously placed structural fill, the dense to very dense silty sand soils were encountered. These dense native soils were encountered to the maximum depth explored of 11.5 feet. These silty sands were also found In the soils investigation performed by Terra Associates for the previous development of the Top Foods grocery store, Based on our review of the Top Foods grocery store construction documents, the area proposed for the new Dick's Drive-in was likely excavated to reach the existing grades during previous parking lot constructJon. No obstructions were revealed by our explorations. However, debris, buried utilities, and old foundation and slab elements are commonly encountered on sites that have had previous development. Grounctwater Conditions No groundwater -seepage was observed in our explorations. The test borings were left open for only a- short time period. Therefore, the seepage levels on the logs represent the locabon of transient water seepage and may not indicate the static groundwater level. Groundwater levels encountered during drilling can be deceptive, because seepage into the boring can be blocked or slowed by the auger itself. It should be noted that groundwater levels vary seasonally with rainfall and other factors. it Is possible that groundwater could be found perched on dense native soil. The stratification lines on the logs represent the approximate boundaries between soil. types at the exploration locations. The actual transition between soil types may be gradual, and subsurface conditions can vary between exploration locations. The logs provide specific subsurface information only at the locations tested. The relative densities and moisture descriptions indicated on the test boring logs are interpretive descriptions based on the conditions observed during drilling, CONCLUSIONS AND RECOMMENDATIONS GENERAL THIS SECTION CONTAINS A SUMMARY OF OUR STUDY AND FINDINGS FOR THE PURPOSES OF A GENERAL OVERVIEW ONLY MORE SPECIFIC RECOMMENDATIONS AND CONCLUSIONS ARE CONTAINED IN THE REMAINDER OF THIS REPORT ANY PARTY RELYING ON THIS REPORT SHOULD RE4D THE ENTIRE DOCUMENT. GEOTECH CONSULTANTS, INC. Dick's Drive -In JN 11016 February 10, 2011 Page 3 The two test borings conducted for this study located outside of the existing stormwater vault area encountered very dense native silty sands with some gravel beneath the existing asphalt parking lot. The test boring drilled near the vault revealed medium -dense to dense structural fill overlying the dense to very dense native soil. The structural fill and the dense native soils are very well suited for foundation support. Conventional footings can be used for the building foundations. The most considerable geotechnical engineering concern of this project is the construction of the new building foundation near the existing detention vault. The proposed location of the eastern building wall Is 1.5 feet to 2 feet west of the western wall of the existing stormwater detention vault. The structural backfill encountered In the test boring near the existing stormwater vault could support the new building loads with minimal differential settlement, but theeastern foundations will impose additional surcharge loads on the walls of the detention vault. If the existing vault foundation walls cannot support any additional surcharge loads, the new foundation loads should be lowered to elevation 352.5 feet, about 2 feet above the vault stab. The most economical method for lowering the foundation loads would be to excavate a trench to elevation 352.5 feet and backfilling the trench with lean mix concrete up to the design footing grade. The depth of the foundation load may be raised to higher -elevation depending -on the structural analysis of the existing vault wall and its lateral capacity. The native silty sand is very dense at shallow depths. Beneath the existing ground surface contains a high slit content, and has very low permeability. It is unlikely that stormwater would infiltrate into these native soils. The drainage and/or waterproofing recommendations presented In this report are intended only to prevent active seepage from flowing through concrete walls:or slabs. Even In the absence of active seepage into -and beneath structures, water vapor can migrate through walls, slabs, and floors from the surrounding soil, and can even be transmitted from slabs and foundation walls due to the concrete curing process. Water vapor also results from occupant uses, such as cooking and bathing. Excessive water vapor trapped Within structures can result in a variety of undesirable conditions, including, but not limited to, moisture problems with flooring systems, excessively moist air within occupied areas, and the growth of molds, fungi, and other biological organisms that may be harmful to the health of the occupants. The designer or architect must consider the potential vapor sources and likely occupant uses, and provide sufficient ventilation, either passive or mechanical, to prevent a build up of excessive water vapor within the planned structure. Geotech Consultants, Inc. should be allowed to review the final development plans to verify that the recommendations presented In this report are adequately addressed In the design. Such a plan review would be additional work beyond the current scope of work for this study, and it may Include revisions to our recommendations to accommodate site, development, and geotechnical constraints that become more evident during the review process. We recommend Including this report, In Its entirety, In the project contract documents. This report should also be provided to any future property owners so they will be aware of our findings and recommendations. SEISMIC CONSIDERATIONS In accordance with Table 1613.5.2 of the 2006 and 2009 International Building Code (IBC), the site class within 100 feet of the ground surface is best represented by Site Class Type, C (Very Dense GECTECH CONSULTANTS, INC. Dick's Drive -In JN 1101-6 February 10, 2011 Page 4 Soil and Soft Rock). As noted In the USGS website, the mapped spectral acceleration value for a 0.2 second (S,) and 1.0 second period (Si) equals 1.2g and 0.4g, respectively. The site soils are not susceptible to seismic liquefaction because of their dense nature and the absence of near - surface groundwater. The International Building Code (IBC) states that a site -specific seismic study need not be performed provided that the peak ground acceleration be equal to SDs/2.5, where SDS is determined in Section 21.2.1 of ASCE 7. Section 21.2.1 indicates that Section 11.4.7 of ASCE 7 should be used. In Equation 11.4-3 it Is noted that SDS is equal to 2/3Sms. Based on Equation 11.4-1, Sms equals F. times Ss, where F, is determined in Table 11.4-1. For our site, F. = 1.0. Thus, the peak ground acceleration = 0.32g. CONVENTIONAL FOUNDATIONS As discussed eadler, if no surcharge loads can be imposed on the vault, the foundation along the eastern building wall should be constructed On lean -mix concrete that extends approximately to elevation 352.5 feet. The base of the excavations needed where lean -mix concrete is to be placed should extend 6 Inches beyond the edges of the footing, and the subgrade should be cleared of any loose or compressible matedal. The overexcavation should be backfilled with. lean -mix concrete within a few hours prior to completing the excavations to reduce the chance of sloughing or caving of the excavations. The remaining foundation portions of the proposed structure can be supported on conventional continuous and spread footings bearing on undisturbed, very dense native soil. We recommend that the continuous and individual spread footings have minimum widths of 12 and 16 inches, respectively. Exterior footings should also be bottomed at least 18 inches below the lowest adjacent finish ground surface for protection against frost and erosion. The local building codes should be reviewed to determine if different footing widths or embedment depths are required. Footing subgrades must be cleaned of loose or disturbed soil prior to pouring concrete. Depending upon site and equipment constraints, this may require removing the disturbed soil by hand. An allowable bearing pressure of 4,000 pounds per square foot (psf) is appropriate for footings supported on competent native soil or lean mix concrete placed atop this native soil. A one-third Increase in this design bearing pressure may be used when considering short-term wind or seismic loads. For the above design criteria, it is anticipated that the total post -construction settlement of footings founded on competent native soil, will be about 0.25 Inch,. with differential settlements on the order of less than one -half -inch in a distance of 50 feet along a continuous footing. with a uniform load. Lateral loads due to wind or seismic forces may be resisted by friction between the foundation and the bearing soil, or by passive earth pressure acting on the vertical, embedded portions of the foundation. For the latter condition, the foundation must be either poured directly against relatively level, undisturbed soil or be surrounded by level* structural fill. We recommend using the following ultimate values for the foundation's resistance to lateral loading: GEOTECH CONSULTANTS, INC. Dick's Drive -In JN 11016 February 10, 2011 Page 5 I Coefficient of Friction 0.50 Passive Earth Pressure �00 pef Where: (1) pef Is pounds per cubic foot, and (11) passive earth pressure Is computed using the equivalent fluid density. If the ground In front of a foundation is loose or sloping, the passive earth pressure given above will not be appropriate. We recommend maintaining a safety factor of at least 1.5 for the foundation's resistance to lateral loading, when using the above ultimate values. PERMANENT FOUNDATION AND RETAINING WALLS Retaining walls backfilled on only one side should be designed to resist the lateral earth pressures imposed by the soil they retain. The following recommended parameters are for walls that restrain level backfill: Active Earth Pressure 35 pcf Passive Earth Pressure 300 pcf Coeffildent of Friction 0.50 Soil Unit Weight 145 pcf Where: (1) pcf Is pounds per cubic foot and (11) active and passive earth pressures are computed using the equivalent fluid pressures. * For a restrained wall that cannot deflect at least 0.002 times Its height, a un1form lateral pressure equal to 10 psf times the height of the wall should be added to the above active equivalent fluid pressure. The values given above are to be used to design only permanent foundation and retaining walls that are to be backfilled, such as conventional walls constructed of reinforced concrete or masonry. It is not appropriate to use the above earth pressures and soil unit weight to back -calculate soil strength parameters for design of other types of retaining walls, such as soldier pile, reinforced earth, modular or soil nail walls. We can assist with design of these types of walls, if desired. The passive pressure given is appropriate for the depth of level structural fill placed in front of a retaining or foundation wall only. The values for friction and passive resistance are ultimate values and do not include a safety factor. We recommend a safety factor of at least 1.5 for overtuming and sliding, when using the above values to design the walls. Restrained wall soil parameters should be utilized for a distance of 1.5 times the wall height from corners or bends in the walls. This Is intended to reduce the amount of cracking that can.occur where a wall is restrained by a comer. GEOTECH CONSULTANTS, INC. Dick's Drive-in February 10, 2011 JN 11016 Page 6 The design values given above do not Include the effects of any hydrostatic pressures behind the walls and assume that no surcharges, such as those caused by slopes, vehicles, or adjacent foundations will be exerted on the walls. If these conditions exist, those pressures should be added to the above lateral soil pressures. Where sloping backfill is desired behind the walls, we will need to be given the wall dimensions and the slope of the backfill in order to provide the appropriate design earth pressures. The surcharge due to traffic loads behind a wall can typically be accounted for by adding a uniform pressure equal to 2 feet multiplied by the above active fluid density. Heavy construction equipment should not be operated behind retaining and foundation walls within a distance equal to the height of a wall, unless the walls are designed for the additional lateral pressures resulting from the equipment. Wall Pressures Due to Seismic Forces The surcharge wall loads that could be imposed by the design earthquake can be modeled by adding a uniform lateral pressure to the above-recom mended active pressure. The recommended surcharge pressure is 7H pounds per square foot (psf), where H is the design retention height of the wall. Using -this Increased pressure, the safety factor against sliding and overturning can be reduced to 1.2 for the seismic analysis. Retaining Wall BacktIll and Waterprootin Backfill placed behind retaining or foundation walls should be coarse, free -draining structural fill containing no organics. This backfill should contain no more than 5 percent silt or clay particles and have no gravel greater than 4 inches in diameter. The percentage of particles passing the No. 4 sieve should be between 25 and 70 percent. If the native silty sand is used as backfill, a drainage composite similar to Miradrain 6000 should be placed against the backfilled retaining walls. The drainage composites should be hydraulically connected to the foundation drain system.. Free -draining backfill or gravel should be used for the entire width of the backfill where seepage is encountered. For increased protection, drainage composites should be placed along cut slope faces, and the walls should be backfilled entirely with free-dratning soil. The later section entitled Drainage Considerations should also be reviewed for recommendations related to subsurface drainage behind foundation and retaining walls. The purpose of these backfill requirements is to ensure. that the design criteria for a retaining wall are not exceeded because of a build-up of hydrostatic pressure behind the wall. The top 12 to 18 inches of the backfill should consist of a compacted, relatively impermeable soil or topsoil, or the surface should be paved. The ground surface must also slope away from backfilled. walls to reduce the potential for surface water to percolate Into the backfill. It Is critical that the wall backfill be placed in lifts and be properly compacted, in order for the above -recommended design earth pressures to be appropriate. The wall design criteria assume that the backfill will be well -compacted in lifts no thicker than 12 inches. The compaction of backfill near the walls should be accomplished with hand -operated equipment to prevent the walls from being overloaded by the higher soil forces that occur during compaction. The section entitled General Earthwork and Structural Fill contains additional recommendations regarding -the placement and compaction of structural fill behind retaining and foundation walls. GEOTECH CONSULTANTS, INC. Dick's Drive -In February 10, 2011 JN 11016 Page 7 The above recommendations are not intended to waterproof below -grade walls, or to prevent the formation of mold, mildew or fungi In interior spaces. Over time, the performance of subsurface drainage systems can degrade, subsurface groundwater flow patterns can change, and utilities can break or develop leaks. Therefore, waterproofing should be provided where future seepage through the walls is not acceptable, This typically includes limiting cold -joints and wall penetrations, and using bentonite panels or membranes on the outside of the walls. There are a variety of different waterproofing materials and systems, which should be Installed by an experienced contractor familiar with the anticipated construction and subsurface conditions. Applying a thin coat of asphalt emulsion to the outside face of a wall is not considered waterproofing, and will only help to reduce moisture generated from water vapor or capillary action from seeping through the concrete. As with any project, adequate ventilation of basement and crawl space areas is Important to prevent a build up of water vapor that is commonly transmitted through concrete walls from the surrounding so![, even when seepage is not present. This Is appropriate even when waterproofing is applied to the outside of foundation and retaining walls. We recommend that you contact a specialty consultant if detailed recommendations or specifications related to waterproofing design, or minimizing the potential for infestations of mold and mildew are desired. The General, Slabs -On -Grade, and Drainage Considerations sections should ba reviewed for additional recommendations related to the control of groundwater and excess water vapor for the anticipated construction. SLABS -ON -GRADE The building floors can be constructed as slabs -on -grade atop the native. material, or on structural fill placed atop the native soils. The subgrade soil must be in a firm, non -yielding condition at the time of slab construction or underslab fill placement. Any soft areas encountered should be excavated and replaced with select, Imported structural fill. Even where the exposed soils appear dry, water vapor will tend to naturally migrate upward through the soil to the new constructed Space above It. This can affect moisture -sensitive flooring, cause imperfections or damage to the slab, or simply allow excessive water vapor into the space above the slab. All interior slabs -on -grade should be underlain by a capillary break or -drainage layer consisting of a minimum 4-inch thickness of gravel or crushed rock that has a fines content (percent passing the No. 200 sieve) of less than 3 percent and a sand content (percent passing the No. 4 sieve) of no more than 10 percent. As noted by the American Concrete Institute (ACI) in the Guides for Concrete Floor and Slab Structures, proper moisture protection is desirable immediately below any on -grade slab that will be covered by tile, wood, carpet, impermeable floor coverings, or any moisture-sensltive equipment or products. ACI also notes that vapor retarders, such as 6-mil plastic sheeting, have been used in the past, but are now recommending a minimum 10-mil thickness. A vapor retarder is defined as a material with a permeance of less than 0.3 perms, as determined by ASTM E 96. It is possible that concrete admixtures may meet this specification, although the manufacturers of the admixtures should be consulted. Where vapor retarders are used under slabs, their edges should overlap by at least 6 inches and be sealed with adhesive tape. The sheeting should extend to the foundation walls for maximum vapor protection. If no potential for vapor passage through tha slab is desired, a vapor barrier should be used. A vapor barrier, as defined by ACI, is a product with a water transmission rate of 0.01 perms when tested in accordance with ASTM E 96. Reinforced membranes having sealed overlaps can meet this requirement. GEOTECH CONSULTANTS, INC. DIck's DrIve-In JN 11016 February 10, 2011 Page 8 In the recent past, ACI (Section 4.1.5) recommended that a minimum of 4 inches of well -graded compactable granular material, such as a 5/8-inch-minus crushed rock pavement base, be placed over the vapor retarder or barrier for their protection, and as a "blotter" to aid in the curing of the concrete slab. Sand was not recommended by ACI for this purpose. However, the use of material over the vapor retarder Is controversial as noted in current ACI literature because of the potential that the protection/blofter material can become wet between the time of its placement and the Installation of the slab. If the material is wet prior to slab placement, which is always possible in the Puget Sound area, it could cause vapor transmission to occur up through the slab in the future, essentially destroying the purpose of the vapor barriedretarder, Therefore, if there is a potential that the protection/blotter material will become wet before the slab is installed, ACI now recommends that no protection/blofter material be used. However, ACI then recommends that, because there Is a potential for slab cure due to the loss of the blotter material, joint spacing in the slab be reduced, a low shrinkage concrete mixture be used, and "other measures" (steel reinforcing, etc.) be used. ASTM E-1643-98 "Standard Practice for Installation of Water Vapor Retarders Used In Contact with Earth or Granular Fill Under Concrete Slabs" generally agrees with the recent ACI literature, We recommend that the contractor, the project materials engineer, and the owner discuss these issues and review recent ACI literature and ASTM E-1643 for installation guidelines and guidance on the use of the protection/blotter material. The General, Permanent Foundation and Retaining Walls, and Drainage Considerations sections should be reviewed for additional recommendations related to the control of groundwater and excess water vapor for the anticipated construction. EKCAVATIONS AND SLOPES No excavated slopes are anticipated other than for utility trenches. Excavation slopes should not exceed the limits specified'in local, -state, and national government safety regulations. Temporary cuts to a depth of about 4 feet may be attempted vertically In unsaturated soil, if there are no indications of slope Instability. However, vertical cuts should not be made near property boundaries, or existing utilities and structures. Based upon Washington Administrative Code (WAC) 296, Part N, the soil at the subject site would generally be classified as Type A. Therefore, temporary cut slopes greater than 4 feet in height. should not. be excavated at an Inclination steeper than 0.75:1 (Horizontal:Vertical), extending continuously between -the top and the bottom of a cut. The above -recommended temporary slope Inclination Is based on the conditions exposed in our explorations, and on what has been successful at other sites with similar soil conditions. It Is possible that. variations In soil and groundwater conditions will require modifications to the inclination at which temporary slopes can stand. Temporary cuts are those that will remain unsupported for a relatively short duration to allow for the construction of foundations, retaining walls, or utilities. Temporary cut slopes should be protected vAth plastic sheeting during wet weather. It Is also important that surface water be directed away from temporary slope cuts. The cut slopes should also be backfilled or retained as soon as possible to reduce the potential for instability. Please note that sand loose soil can cave suddenly and without warning. Excavation, foundation, and utility contractors should be made especially aware of this potential danger. These recommendations may need to be modified if the area near the potential cuts has been disturbed In the past by utility Installation, or if settlement -sensitive utilities are located nearby. GEOTECH CONSULTANTS, INC. Dlol(js Drive-in February 10, 2011 DRAINAGE CONSIDERATIONS JN 11016 Page 9 Foundation drains should be used where (1) crawl spaces or basements will be below a structure, (2) a slab Is below the outside grade, or (3) the outside grade does not slope downward from a building. Drains should also be placed at the base of all earth -retaining walls. These drains should be surrounded by at least 6 inches of I - inch -minus, washed rock and then wrapped In non -woven, geotextile filter fabric (Mirafi 140N, Supac 4NP, or similar material). At its highest point, a perforated pipe invert should be at least 6 inches below the bottom of a slab floor or the level of a crawl space, and it should be sloped for drainage. All roof and surface water drains must be kept separate from the foundation drain system. A typical drain detail Is attached to this report as Plate 5. For the best long-term performance, perforated PVC pipe is recommended for all'subsurface drains, As a minimum, a vapor retarder, as defined in the Slabs -On -Grade section, should be provided In any crawl space area to limit the transmission of water vapor from the. underlying soils. Also,. an outlet drain Is recommended for all crawl spaces to prevent a build up of any water that may bypass the footing drains. No groundwater was observed during our field work. If seepage is encountered in an excavation, it. should be drained from the site by directing It through drainage ditches, perforated pipe, or French drains, or by pumping it from sumps Interconnected by shallow connector trenches at the bottom of the excavation. The excavation and site should be graded so that surface water Is directed off the site and away from the tops of slopes. Water should not be allowed to stand in any area where foundations, slabs, or pavements are to be constructed. FInal site grading in areas adjacent to a building should slope away at least 2 percent, except where the area is paved. Surface drains should be provided where necessary to preventponding of water behind foundation or retaining walls. GENERAL EARTHINORK AND STRUCTVRAL FILL All building areas -should be stripped of existing asphalt pavements and any, topsoil, organic soil, and other deleterious material. The stripped or removed materials should not be mixed with any materials to be used as structural fill. Structural fill Is defined as any fill, including utility backfill, placed under, or close to, a building, behind permanent retaining or foundation walls, or in other areas where the underlying soil needs to support loads. All structural fill should be placed in horizontal lifts with a moisture content at, or near, the optimum moisture content. The optimum moisture content is that moisture content that results in the greatest compacted dry density. The moisture content of fill is very important and must be closely controlled during the filling and compaction process. The allowable thickness of the fiR lift will depend on the material type selected, the compaction equipment used, and the number of passes made to compact the lift. The. loose lift thickness should not exceed 12 Inches. We recommend testing the fill as it is placed. If the fill is not sufficiently compacted, It can be recompacted before another lift is placed. This eliminates the need to remove the fill to achieve the required compaction. The following table presents recommended relative compactions for structural fill: GEOTECH CONSULTANTS, INC. Dick's Drive -In JN 11016 February 10, 2011 Page 10 Beneath footings, slabs 96% or walkways I Filled slopes and behind 90% retainin-a walls I 95% for upper 12 Inches oi Beneath pavements I subgrade; 90% below that Where: Minimum Relative Compaction Is the ratio, expressed In percentages, of the compacted dry density to the maximum dry density, as determined In accordance with ASTM Test Designation D 1557-91 (Modified Proctor). Use of On -Site Sol/ If grading- activities take place during wet weather, or when the silty, on -site soil is wet, site preparation costs may be higher because of delays due to rain and the potential need to import granular fill. The on -site soil is generally silty and therefore moisture sensitive. Grading operations Will be difficult during wet weather, or when the moisture content of this soil exceeds the optimum moisture content. The moisture content of the silty, on -site soil must be at, or near, the optimum moisture content, as the soil cannot be consistently compacted to the required density when the moisture content is significantly greater than optimum. The on -site silty sand underlying the existing pavement could be used as structural fill, if grading operations are conducted during hot, dry weather, when drying the wetter soil by aeration is possible. During -excessively dry weather, however, It may be necessary to add water to achieve the optimum moisture content. Moisture -sensitive soil may also be susceptible to excessive softening and "pumping" from construction equipment, or even foot traffic, when the moisture content is greater than the optimum moisture content. It may be beneficial to protect subgrades with a layer of imported sand or crushed rock to limit disturbance from traffic. A significant geotechnical consideration for development of this site is the overly moist to wet condition of the silty soils. Based on our observations, and the results of our laboratory tests, the moisture contents of the on -site soils are significantly above the optimum moisture content necessary for the required structural fill compaction. These. fine-grained, silty soils are sensitive to moisture, which makes them impossible to adequately compact when -they have moisture contents even 2 to 3 percent above their optimum moisture content. The reuse of these soils as structural fill to level the site will only be successful during hot, dry weather. Aeration of each loose lift of soil will be required to dry it before the lift is compacted. Alternatively, the soil could be chemically dried by adding lime, kiln dust, or cement, provided this is allowed by responsible building department. Regardless of the method of drying, the earthwork process will be slowed dramatically. The earthwork contractor must be prepared to rework areas that don't achieve proper compaction due to high moisture content. Utility trench backfill In structural areas, such as pavements, must also be dried before it can be adequately compacted, Improper compaction of backfill In utility trenches and around control structures is a common reason for GEOTECH CONSULTANTS, INC. Dick's Drive -In February 10, 2011 JN 11016 Page 11 pavement distress and failures. Imported granular fill will be needed wherever it is not possible to dry the on -site soils sufficiently before compaction. LIMITATIONS The conclusions and recommendations contained in this report are based on site conditions as they existed at the time of our exploration and assume that the soil and groundwater conditions encountered In the test borings are representative of subsurface conditions on the site. If the subsurface conditions encountered during construction are significantly different from those observed in our explorations, we should be advised at once so that we can review these conditions and reconsider our recommendations where necessary.. Unanticipated soil conditions are commonly encountered on construction sites and cannot be fully anticipated by merely taking soil samples In test borings. Subsurface conditions can also vary between exploration locations. Such unexpected conditions frequently require making additional expenditures to attain a property constructed project. It is recommended that the owner consider providing a contingency fund to accommodate such potential extra costs and risks. This is a standard recommendation for all projects. This report has been prepared for the exclusive use of Dick's Drive -Ins, LTD, and Its representatives, for specific application to this project and site. Our recommendations and conclusions are based on observed site materials, and selective laboratory testing and engineering analyses. Our conclusions and recommendations are professional opinions derived in accordance with current standards of practice within the scope of our services and. within budget and time constraints. No warranty is expressed or Implied. The scope of our services does not include services related to construction safety precautions, and our recommendations are not intended to direct the contractors methods, techniques, sequences, or procedures, except as specifically described In our report for consideration in design. Our services also do not Include assessing or minimizing the potential for biological hazards, such as mold, bacteria, mildew and fungi* in either the existing or proposed site development. ADDITIONAL SERWCES In addition to reviewing the final plans, Geotech Consultants, Inc. should be retained to provide geotechnical consultation, testing, and observation services during construction. This is to confirm that subsurface conditions are consistent with those indicated by our exploration, to evaluate whether earthwork and foundation construction activities comply with the general intent of the recommendations presented in this report, and to provide suggestions for design changes In the event subsurface conditions differ from those anticipated prior to the start of construction. However, our work would not include the supervision or direction of the actual work of the contractor and its employees or agents. Also, job and site safety, and dimensional measurements, will be the responsibility of the contractor. During the construction phase, we will provide geotechnical observation and testing services when requested by you or your representatives. Please be aware that we can only document site work we actually observe. It Is still the responsibility of your contractor or On -site construction team to verify that our recommendations are being followed, whether we are present at the site or not. GEOTECH CONSULTANTS, INC, Dick's Drive -In JN 11016 February 10, 2011 Page 12 The following plates are attached to complete this report: Plate 1 Vicinity Map Plate 2 Site Exploration Plan Plates 3 thru 4 Test Boring Logs Plate 5 Typical Footing Drain Detail We appreciate the opportunity to be of service on this project. If you have any questions, or if we may be of further service, please do not hesitate to contact us. JLH/DRW: jyb Respectfully subm D. Robert Ward, P.E. Principal GEOTECH CONSULTANTS, INC. INC. fact on 4 4p I f M-B-2 -L f Y,N* '�-Proposecl Location of vp New Building f f Existing 8�toirnw,ater Detention Vault Lenend: 0 Test boring looatlon GEOTECH CIONSULTAWS, INC. WA SUE EXPLORATION PLAN 21984 State Route 99 Edmonds, Washington Job NO. Date: Plato., 1101.6 1 Jan. 2011 1 1 2 5 10 15 A ol 4P 5 10 is 26 82 (11.) 65 50 (6") 50 (6") 50 50 00 BORING 1 Description 14-inches of asphalt concrete over Brown SAND with gravel, medium grained, moist, medium dense 111 FILL (Structural FILL) 21 3 1 -becomes very dense Light gray silty SAND with gravel, moist, very dense -gravel lense 011H.111 - • Test boring was termlinated at 11.5 feet on January 26, 2011. • No groundwater was encountered during drilling. BORING 2 Description 4-inches of asphalt concrete over Light gray, slightly silty SAND with gravel, medium grained, moist, very dense I I I 12 3 M. '';I:; Test boring was terminated on 11.5 feet on January 26, 2011. No groundwater was encountered during. drilling. GEOTECH CONSULTAWS,.INC. TEff BORING LOG 21984 State Route 99 Edmonds, Washington Job Date: I Logged by. 11016 1 Jan. 2011 JLH 1plate: 3 1 5 1 10 I is I& BORING 3 e 100 Description 4 -inches of asphalt concrete over Light gray, slightly silty SAND with gravel, fine to medium grained, moist, very dense (5") 50 (5") 50 (511) M 11HUM111 111 Test boring was terminated on January 26, 2011 at 11.5 feet. No groundwater was encountered during drilling. GEOTECH CONSULTAWS, INC. TEST BORING LOG 21984 State Route 99 Edmonds, Washington Job Date: Loggedby: 1PIate: 11016 1 Jan.2011 I JLH L 4 I Slope backfill away from foundation. Provide surface drains where necessary. Backfill (See text for requirements) Nonwoven Geotextile Washed Rock Filter Fabric (7/8" min. size) a, a 60 a Ab 6 -'D. 4" min. Tightlirie Roof Drain (Do not connect to footing drain) Possible Slab 4" Perforated Hard PVC Pipe (Invert at least 6 inches below slab or crawl space. Slope to drain to appropriate outfall. Place holes downward.) Vapor Retarder/Barrier and Capillary Break/Drainage Layer (Refer to Report text) NOTES: (1) In crawl spaces, provide an outlet drain to prevent buildup of water that bypasses the perimeter footing drains. (2) Refer to report text for addifional drainage, waterproofing, and slab considerations. GEOTECH CONSULTANTS, INC. FOOTING DRAIN DETAIL 21984 State Route 99 Edmonds, Washington Job NO. DOM PAM?. 11016 1 Jan. 2011 1 1 5 aftvsz�w uoruonD'err ATTORNEYS AT LAWL L I Joel M. Gordon February 11, 2011 Development Services Department City of Edmonds 121 - 5th Avenue North Edmonds, WA 98020 2025 First Avenue, Suite 500 Seattle, WA 98121-3140 Phonei 206.382.9540 Fax: 206.626.0675 www.GordonDerr.com Re: . Dick's Drive -In Permit Applications — Reciprocal Easement Agreement To Whom It May Concern: This office represents Briar Development Company LLC ("Briar"), the current property owner of the parcel which is subject to permit applications for the development of a new Dick's Drive -In Restaurant ("Dick's) near the intersection of Highway 99 and 220,h in tile City of Edmonds. Dick's has entered into a Purchase and Sale Agreement with Briar for the acquisition of the parcel that is subject to the development applications. The attached Reciprocal Easement Agreement between the patties has been fully negotiated and agreed to by the parties. As a result, the parties are contractually committed to enter into the Reciprocal Easement Agreement upon the closing of Dick's acquisition of the parcel. This letter is being issued to provide the City of Edmonds with the assurance that the attached easement will be in place in conjunction with the development of the property. If you have any questions, please do not hesitate to contact me. JMG:IkI Enclosure cc: Gary Hall Glen Foresman Eugene. Wong RECEIVED . FEB 14 2011 DEVELOPMENT SERVICES CTR- CITY OF EDMONDS Sa" N& we �, I HtF FILE 't Y:NWPffEDM0lf0Sl,DlCK'S\REA G.DOC 2/11/11 RECIPROCAL EASEMENT AGREEMENT BETWEEN BRIAR DEVELOPMENT COMPANY LLP and HAGGEN, INC. and DICK'S DRIVE-INS, LTD., L.P. !G TABLE OF CONTENTS Section Page ARTICLEI ................................................................................................................................. I DEFINITIONS............................................................................................................................. I 1.1 Lot ......................................................... I ................... I .............................................. I 1.2 Floor Area ....................................... ; ............................................... ....................... 2 1.3 Occupant ... 4 ................................... ; ................................... I ....................... ; .............. 2 1.4 Party ........................................................................................................................ 2 1.5 Permiltee ................................................................................................................. 2 1.6 Person ........................................................................................................................ 3 1.7 Shopping Center ...................................................................................................... 3 1.8 Site Plan .......................................................................................... ....................... 3 1.9 Access Road ............................................................................................................. 3 1.10 Common Area ......................................................................................................... 3 ARTICLE2 ............................................................................................................................... �.A EASEMENTS.... i ........................................................................................................................ 4 2.1 Ingress and Egress ................................................................................................... 4 2.2 Utilities .................................................................................................................... 6 2.3 Storm Drainage'& the Storm Water Detention Facility ........................................... 7 2.4 Landscape Alteration and Management Easement ................................................. 9 2.5 Limitation ................. I ............................. I ....................... ... ..................................... 10 ARTICLE3 ................................................................................................................................ 10 CONSTRUCTION.................................................................................................................... 10 3.1 General Requirements ........................................................................................... 10 3.2 Improvements on Lot 2 ......................................................................................... 11' 3.3 Building Improvement .......................................................................................... 12 3.4 Heavy Construction Activity Black -out Period .................................................... 12 ARTICLE4 ............................................................................................................................... 13 MAINTENANCE AND REPAIR ........... .................................................................................. 13 4.1 Utilities .................................................................................................................. 13 4.2 Building Improvements ........................................................................................ 13 4.3 Access Drives ........................................................................................................ 14 ARTICLE5 ............................................................................................................................... 14 OPERATIONS OF SHOPPING CENTER .............................................................................. 14 5.1 Uses ....................................................................................................................... 14 5.2 Insurance.: .............................................................................................................. 17 5.3 Liens ...... ...... 18 ARTICLE6 ................................................................................................................................. 19 MISCELLANEOUS ................................................................................................................. 19 6.1 Default ................................................................................................................... 19 6.2 Interest ................................ : .... ............................................................................. 20 6.3 Notices ........................ I ........................ I .............................................. o .................. 20 Y:%WPffFDM0NDSxD1CKS'RCA GDOC 211 V1 I Fn 6.4 Approval Rights .................................................................................................... 21 6.5 Binding Effect � ...................................................................................................... 22 6.6 Singular and Plural ........................................................................ ! ....................... 22 6.7 Coi]interparts and Signature Pages ........................................................................ 22 6.8 Negation of Partnership ........................................................................................ 22 6.9 Not a Public Dedication ........................................................................................ 22 6.10 Excusable Delays ................................... ........................................... ; .................. 23 6.11 Severability ........................................................................................................... 23 6.12 Amendments ........................................ I ................................................................ 23 6.13 Captions and Capitalized Terms ........................................................................... 23 6.14 Minimization of Damages ..................................................................................... 23 6.15 Agreement Shall Continue Notwithstanding Breach ............................................ 24 6.16 Time ....................................................... .............................................................. 24 6.17 Non Waiver ........................................................................................................... 24 ARTICLE7 ................................................................................................................... ........... 24 TERM........................................................................................................................................ 24 7.1 Term of this Agreement .......................................................................... I .............. 24 EXHIBIT A Legal Description of Lot 2 EXHIBIT B Legal Description of Lot I EXHIBIT C Site Plan EXHIBIT D Dick's Approved Building Plans EXHIBIT F Form Easement Agreement V:%WPXHTDMONDS1J)1CKV,R,FA G.DOC 2!11/11 M RECIPROCAL EASEMENT AGREEMENT . THIS RECIPROCAL EASEMENT AGREEMENT ("AGREEMENT" or "REA") is made and entered into as of the day of � 2011, between BRIAR DEVELOPMENT COMPANY LLP, a Washington limited liability partnership ("Briar"), HAGGEN, INC., a Washington corporation ("Haggen") and DICK'S DRIVE-INS, LTD., L.P., a Washington limited partnership ("Dick's"). Briar and Haggen are collectively referred to herein as the "Haggen Parties". WITNESSETH WHEREAS, Dick's is acquiring from Briar that certain - parcel of undeveloped land located in the City of Edmonds, Snohomish County, Washington, More particularly described on Exhibit A attached hereto and made'a part hereof ("Lot 2"); WHEREAS, Lot 2 is part of a short plat consisting of two parcels recorded under Snohomish County Auditor's File 200307295008 (the "Short Plat"). Haggen, Briar's affiliate, has a leasehold interest in Lot 1, as identified on the Short Plat and more particularly described on Exhibit B attached hereto and made a part hereof ("Lot I upon which it operates a TOP Food and Drug store; WHEREAS, Lot I and Lot 2 (collectively, the "Lots") are contiguous and adjacent as shown on the Short Plat; WHEREAS, Dick's intends to develop and operate Lot 2 and in order to effectuate the common use of the Lots as integral parts of a retail shopping complex and to prevent material adverse effects to Lot I and Lot 2 as a result of the development, use, and operation of Lot I and Lot 2, the parties desire to enter into certain agreements; NOW, THEREFORE, in consideration of the covenants and agreements hereinafter set forth and in furtherance of the parties understanding, it is agreed as follows: ARTICLE 1. DEFINITIONS 1.1 Lot "Lot" shall mean either Lot I or Lot 2 or such further subdivisions thereof as may occur in the future. YATIHIEDMONDSIDICK'ST-EA GDOC 211 In I M 1.2 Floor Area "Floor Area" shall inean the acival number of square feet of space contained on each floor within a building, as measured firom the exterior faces of the exterior walls and/or the center of any common walls; provided however, that space used for building utilities or mechanical equipment shall not be included in such calculations. 1.3 Occupant "Occupant" shall mean any Person from time to. time entitled to the use and occupancy of any portion of a building on Lot I or Lot *2 under an ownership right or any lease, sublease, lidense,, concession, or other similar agreement. 1.4 Party "Party" shall mean each signatory hereto and, after compliance with the notice requirements set forth below, their respective successors and assigns. Until the notice requirement is complied with, the transferring Party shall (for the purpose of this Agreement only) be' the transferee's agent. Each Party shall be liable for the performance of all covenants, obligations and undertakings herein set forth with respect to the Lot owned or occupied by it which accrue during the period of such ownership or occupancy, as applicable, and such liability shall continue with respect to any portion transferred until the notice requirement set forth below is complied with, at which time the transferring Party's liability for future obligations shall terminate. The transferee Party,shall automatically become liable for all obligations, performance requirements and amounts which afise subsequent to compliance with the notice requirement. A Party transferring all or any portion of its interest in a Lot shall give notice to all other Parties of such transfer and shall include therem, at least the following information: (i) the name and address of the transferee; and (ii) in the case of a transfer of a portion of a Lot, a copy of the legal description of the portion thereof transferred. . Nothing contained herein to the contrary shall affect the existence, priority, validity or enforceability of any lien pen-nitted hereunder which is placed upon a Lot prior to receipt of the notice. 1.5 Pen-nittee "Permittee" shall mean all Occupants.and the officers, directors, employees, agents, collators, customers, vendors, suppliers, visitors, invitees, licensees, subtenants, and contractors of Occupants insofar as their activities relate to the intended use of a Lot. Among V:',WPW,EDM0NDS%DICKSULFA GDOC 2/11111 PC others, Persons engaging in the following activities on the Lots will not be considered to be Permittees: (i) Exhibiting any placard, signs or notice; . I (ii) Distributing any circu lar, handbill, placard, or booklet; (iii) Soliciting memberships or contributions; (iv) Parading, picketing" or demonstrating; or (v) Failing to follow regulations relating to the use of the Lots. 1.6 Person "Person" shall mean any individual, partnership, firm, association, corporation, trust, or any other form of business or government entity. 1.7 Shopping Center The "Shopping Center" shall mean the area encompassed by the Lots. 1.8 Site Plan Attached hereto as Exhibit C is the "Site Plan" which illustrates the agreed initial locations of the buildings, access drives, parking layout and other improvements to be developed on Lot 2, which Site Plan was approved by Briar pursuant to the ten-ns of the Real Estate Purchase and Sale Agreement dated October 12, 2010 for the sale of Lot 2 from Briar to Dick's (the "REPSA"). 1.9 Access Road "Access road" shall mean those roads or driveways that provide direct access to Lot 2 from any county or public road as shown on Exhibit C. 1. 10 Common Area. "Common Area" shall mean all areas within the exterior boundaries of the Shopping Center, exclusive of where buildings exist or are from time to time constructed and all r.P abutments and dedicated patio areas thereof Y:NWPW,EDM0NDS\DI0CS\kEA GDOC 2111111 3 ARTICLE 2. EASEMENTS' 2.1 Ingress and Egress During the terrn of this REA as set forth in Article 7, and perpetually thereafter with respect to the Haggen Easement (as defined in paragraph 2.1(vi)), each Party hereby grants and conveys to the other Party for its use and for the use of its Permittees, in common with others entitled to use the same, a non-exclusive easement for ingress and egress for the passage of vehicles over and across theparking and driveway areas of the other. Party's Lot as the same may from time to time be constructed and maintained for such use and for the pass . age and accommodation Of pedestrians over and across the parking, driveways and sidewalk areas of the Party's Lot as the same may fi-om. time to time be constructed and maintained for such use. Such easement rights shall be subject to the following reservations as well as other provisions contained in this REA: . (i) Except as otherwise provided, only the owner of Lot I shall allow its Permittees to use any portion of Lot I for parking purposes and only the owner of Lot 2 shall allow its Pen-nittees to use any portions of Lot 2 for parking purposes, and each Party recognizes and agrees that no Party shall be deemed to have an easement or any other right to use any portion of another Party's Lot for parking purposes. Notwithstanding the above or anything to the contrary: (a) both Parties understand and acknowledge that Lot 2 is not large enough to provide all of the parking for Lot 2 Permittees, required by current ordinances and regulations for the type of fast food restaurant that Dick's plans to build on Lot 2. Accordingly, for so long as a fast food restaurant is operated thereon, Lot 2 is hereby granted a parking easement, along with the corresponding ingress and egress therefor, over Lot I to provide, along with the parking spaces on Lot 2, the minimum number of parking spaces required for Dick's to obtain its building permit ftom the City of Edmonds and to remain in compliance therewith, which the Parties currently understand to be approximately 20 parking spaces. In the event parking spaces on Lot I need to be designated for the benefit of Lot 2, the Owner of Lot l.will designate them from among those parking spaces on Lot I situated closest to Lot 2. Provided further that such parking on Lot I shall not be utilized for employee parking for Lot 2. Such easement shall be separately recorded upon finalization of the construction on Lot 2 and each Party agrees to sign the necessary documents to finalize the easement and (b) except to the extent authorized by the foregoing parking easernent, the Parties also understand that "cross parking" may happen with common patrons or "overflow" parking may take place on occasion. Each Party agrees to use its reasonable best efforts to prevent its Permittees from violating this' provision, such measures to include but not be limited to appropriate notice and signage of this parking restriction. YAWMEDMONMUCKSREA GDOC 2/11111 In the event overflow parking occurs with any regularity, the owner of the lot whose Permittees are violating this provision shall pay for the installation of adequate signage on the other party's lot informing Permittees of the parking restrictions of this agreement (e.g. "no restauranf'or "no supermarket parking" as the case may be located in the problem areas). Parties may also take necessary self-help measures to enforce the provisions of this paragraph including, without limitation, towing violating vehicles provided the parties agree to notify the on -site manager of the other party before implementing a towing program.but will not be required to provide notice on an individual incident basis. The intent of the provisions of this section is to control parking abuses and repeat parking offenders and not patrons of either. establishment who on occasion or inadvertently park in the wrong location. Provided, however, that if a Party has exercised its reasonable best efforts as required by this paragraph and nevertheless its Permittees continue to violate this provision, such violations shall not be considered a default by said Party under this REA nor forrn the basis of a claim for damages by any other Party. (ii) Except for situations specifically provided for in the following subparagraphs, no fence or other barrier which would unreasonably prevent or obstruct the passage of pedestrian or vehicular travel for the purposes herein permitted shall be erected or permitted within or across the aforesaid easement areas; provided, however, that the foregoing provision shall not prohibit the installation of convenience facilities (such as mailboxes, public telephones, benches or public transportation shelters), landscaping, berms or planters, nor of limited curbing and other forms of traffic controls. (iii) In connection with any construction, reconstruction, repair or maintenance on its Lot, each Party reserves the right to create a staging and/or storage area, in the Ccimmon Area on its Lot at such location as will not unreasonably interfere with access between such Lot and the other areas of the Shopping Center. (iv) Each party further reserves the right to close off its portion of the Common Area for such a reasonable period of time as may be legally necessary or agreed among the parties to prevent the acquisition of prescriptive rights by any third party. Provided, however, that prior to closing off any portion of the Common Area, as herein provided, such Party shall give written notice to each other Party of its intention to do so, and shall attempt to coordinate such closing with each other Party so that no unreasonable interf�rence in the passage of pedestrians or vehicles shall occur, (v) Each Party reserves the right- at any time and from time to. time to exclude and restrain any Person who is not a Permittee fi-om using its Common Area. V:MP,H'kEDMONDS%D1CK'S\REA G.DOC VIIIII . (vi)' Notwithstanding the termination date of this Agreement, the Haggen Parties hereby agree to grant a per petual ingress and egress easement for pedestrian, vehicular, and utility access, maintenance, and repair as shown on die Site Plan (the "Haggen Easement"). Such easement shall be consistent with this REA and separately recorded upon finalization of the construction on Lot 2 and each P ' arty agrees to sign the necessary documents to finalize the easernent, which shall be substantially in the form attached hereto as Exhibit "E" and made a part hereof. 2.2 Utilities A. Each Party hereby grants and conveys to each other Party non- exclusive perpetual easements in, to, over, under, along and across those portions of the Common Area (exclusive of any portion located within any building, patio, or abutment thereof) located on the Party's Lot necessary for the installation, operation, flow, passage, use, maintenance, connection, repair, relocation, and removal of lines or systems for the following utilities, as currently exist or may be installed in the future, serving the Party's Lot: sanitary sewers, water, irrigation, gas, electrical, telephone and communication lines. Except with respect to ground mounted electrical transformers at the rear of a building or as may be necessary Auring periods of construction, repair, or temporary service, all utilities shall be underground unless required to be above ground by the utility providing such service. Prior to exercising the right granted herein for any utility line not in service as of the date hereof, the Party requiring access shall first provide the other Party with a written statement describing the need for such easement, a survey and proposed final working drawings and specifications for construction of the proposed utility line, and an architect's or engiReer's report that contains all information the other Party may reasonably request in connection with the proposed utility line and all other work to be performed in connection therewith, shall identify the proposed location of the utility, and shall furnish a certificate of insurance showing that its contractor has obtained the minimum insurance coverage required by Section 51(ffi hereof. Any Party installing utilities pursuant to the provisions of this subparagraph shall pay all costs and expenses with respect thereto and shall cause all work in connection therewith (including general clean-up and proper surface and/or subsurface restoration) to be completed as quickly as possible and in a manner so as to minimize interference with the use of the Common Area. B. The initial location and width of any utility not in service as of the date hereof shall be subject to the prior written approval of the Party whose Common Area is to be burdened thereby, such approval not to be unreasonably withheld, conditioned, or delayed. '17he easement area shall be no larger than whatever is necessary to reasonably satisfy the utility company as to a public utility or five feet (Y) on each side of the centerline as to a private line. Upon request, the Grantee shall provide to the Grantor a copy of an as -built survey showing the location of such utility. The Grantor shall have the right at any.time to relocate a utility line upon thirty (30) days' prior written notice, provided that such relocation: V-.',WPI.H\EDMONDS'l.DICK'S\FLEA G.DOC 2A 1/11 _J (i) shall not interfere with or diminish the utility services to the Grantee; (ii) shall not reduce or unreasonably impair the usefulness or function of such utility; (iii) shall be perfort-ned without cost or expense to Grantee; (iv) shall be completed using materials and design standards which equal or exceed those originally used; and (v) sh all have been approved by the utility company and the appropriate governmental or quasi -governmental agencies having jurisdiction thereover. Documentation of the relocated easement area shall be the Grantor's expense and shall be accomplished as soon as possible. Grantee shall have a right to require an as -built survey of such relocated utility be delivered to it at Grantor's expense. 2.3 Storm Drainage & the Storm Water Detention Facility A. The Parties acknowledge that, as of the date of this REA, the stdrmwater runoff from the impervious surfaces on Lot I and Lot 2 runs into'a common storm drainage system that currently serves both Lot I and Lot 2 (the "Storm Drainage System") including a Storm Detention Vault (hereafter the "SDV") that is located on both Lot 1 and Lot 2. Dick's and the Haggen Parties shall not construct any building over the Storm Drainage System; provided, however, that Dick's may at its sole expense construct a concrete patio over the SDV (so long as the existing access points to and into the SDV remain accessible for repair and.maintenance work) and/or relocate within Lot 2 all or portions of the Storm Drainage System on Lot 2 to remove the system from a building footprint or to otherwise accommodate construction on Lot 2, as long as the replacement facilities function as well as the facilities they replace and as long as all relevant governmental agencies approve the relocation without imposing any conditions on Briar or Lot 1. B. Dick's hereby grants to Briar a nonexclusive perpetual easement for the use, operation, maintenance, repair, replacement, alteration and improvement of the portion of the Storm Drainage System that is located on Lot 2 (together with the right of ingress and egress across Lot 2 necessary to accomplish the same), in the location where the system now exists or in the location where it may exist in the future as provided herein, and the Haggen Parties hereby grant to Dick's -a nonexclusive perpetual easement for the use, operation, maintenance, repair, replacement, alteration, and improvenfent of the portion of the Storm Drainage System that is located on Lot I (together with the right of ingress and egress across Lot I necessary to accomplish the sarne), in the location where the system now exists or the Y:%WF',.Jf,EDMOND91DICKS!REA C.DOC location where it may be relocated in the future (collectively the "Storm Drainage Easements"); provided, however, that: (i) If, when Dick's seeks to construct building or site improvements on Lot 2, the physical or. engineering constraints of the Storm Drainage System or the regulatory requirements of the City of Edmonds or any other governmental authority with jurisdiction over the Lots make it necessary to constriact improvements or additions to the Storm Drainage System to accommodate storinwater runoff from Lot 2 following construction of such building or site improvements (including but not limited to improvements or additions to the Storrn Drainage System to provide improved or increased conveyance, detention, retention, or water quality treatment), Dick's shall be responsible, at its sole cost and expense, for constructing the necessary improvements or additions to the Storm Drainage System. All detention, retention, or water quality treatment facilities required, as a physical, engineering or regulatory matter, to accommodate stormwater runoff from Lot 2 shall be located.on Lot 2 unless Briar, in its reasonable discretion, gives its consent for such facilities to be located on Lot 1. If it is not possible to segregate the stormwater runoff from Lot 2 and Lot 1, and detention, retention, or water quality treatment facilities required for purposes of accommodating stonnwater runoff from Lot 2 must therefore also accommodate stormwater runoff from Lot 1, Dick's shall still be responsible, at its sole cost and expense, for constructing the necessary improvements or additions to the Storm Drainage System notwithstanding that the improvements or additions will accommodate runoff from both Lots. In this situation, Dick's must still obtain Briar's consent, in Briar's reasonable discretion, for -any detention, retention, or water quality treatment facilities to be located on Lot 1. (ii) If, under the regulations of the City of Edmonds or any other goverrunental authority with jurisdiction over the Lots, the construction of building or site improvements on Lot 2 triggers a requirement to construct improvements or additions to the Storm Drainage System (whether on Lot I or Lot 2) for purposes of accommodating storinwater runoff from Lot I (including but not limited to improvements or additions to the Storm Drainage System to provide improved or increased conveyance, detention, retention, or water quality treatment), Pick's shall be responsible, at its sole cost and expense, for constructing the necessary improvements or additions to the Storm Drainage System. Dick's must obtain Briar's consent, in Briar's reasonable discretion, for any detention, retention, or water quality treatment facilities to be located on Lot 1. (iii) Prior to any relocation of the Storm Drainage System on Lot 2, or to the construction of any improvements or additions to the Storm Drainage System on either Lot, Dick's shall submit to Briar detailed plans for the work. Y:*VV,J+XDMONDS,D1CKSqMA G.DOC V11111 Briar must approve such plans prior to commencement of construction, said consent not to be unreasonably withheld, conditioned or delayed. C, Each Party shall repair and maintain in first-class condition any portion of the Storm Drainage System located on its Lot; provided however that the Haggen Parties shall, maintain, repair and alter as needed or required by legitimate government authority, the SDV with cacti Party sharing the costs of such, maintenance, repair, or alteration based on the proportion that -each Party's lot bears to the collective size of both Lots; and provided further that if the SDV ever needs to be substantially or completely replaced, it will be abandoned in place so as to minimize the disruption to Lot 2 and Dick's business, and the replace�ment SDV shall be constructed on Lots 1 and/or Lot 2 where it will be least disruptive and intrusive to both Parties' business operations. If the Parties cannot agree on this location, the matter shall be s . ubmitted to an arbitrator appointed by Snohomish County Superior Court. The decision of the arbitrator shall be final and judgment on the arbitration award may be filed by either party with Snohomish County Superior Court. All work by a Party in conjunction with maintenance, repair or alteration of the Storm Drainage system including the SDV shall be performed so as to minimize to the extent that is commercially reasonable the disruption to the other Party's business operations; and unless it is an emergency or Dick's gives its prior consent (which consent shall not be unreasonably withheld, conditioned or delayed), all work performed on the SDV by any one of the Haggen Parties or any of their agents shall be scheduled with Dick's no less than thirty (30) days in advance, and to the ekient Dick's requires any such work to be commenced, completed, or cleaned up between the hours of 2:30 AM to IOAM local time, or on Thanksgiving Day or Christmas Day, Dick's will pay the additional expense for work performed during those times and/or days to the extent the labor charge exceeds the then prevailing rate for daytime non -holiday labor.. 2.4 Landsc4pe Alteration and Management Easement There currently exists a portion of Lot I that exists east of Lot 2 between Lot 2 and SR 99, between the two existing access drives to SR 99, that is maintained as a landscaped- area and biofiltration swale (the* "Landscape Strip"). Some of the larger vegetation in the Landscape Strip may block the visibility of the building and/or signage proposed to be developed on Lot 2. The Haggen Parties hereby grant Dick's an easement to enter into the Landscape Strip to have the right to cut, remove and replace of any and all trees or other vegetatio ' n in the Landscape Strip which limit the visibility of the improvements on Lot 2, so long as any landscaping that is removed or altered is replaced with landscaping of a quality consistent with that maintained elsewhere on Lot I and Dick's makes whatever -alterations may be reasonably necessary to the existing irrigation system for such replacement landscaping to become established and be maintained in a healthy condition. Prior to making any cutting or removing any landscaping, Dick's shall secure any and all approvals required from the City of Edmonds for such work. Provided farther that Dick's shall not make any alterations to vegetation, topography or drainage that would negatively impact the operation and maintenance of thd biofiltration swale that exists in the Landscape Strip. Y:\WP%H\EDMONDS1D1CKS,REA GDOC 2111111 2.5 Limitation No Party shall grant any easement for the benefit of any property not within the Shopping. Center; provided, however, that the foregoing restriction on the granting of easements shall not prohibit the granting or dedicating of utility easements by a Party on its Lot to governmental or quasi-govemmental authorities or to public utilities. ARTICLE 3. CONSTRUCTION 3.1 General Requirements A. The Parties agree that -all construction activitie's performed by any one of them on Lot I or Lot 2, as the case may be, shall be performed in compliance with all laws, rules, regulations, orders, and ordinances of the city, county, state, and federal governments, or any depa rtment or agency thereof, With jurisdiction over the improvements constructed within the Lots. B. Each Party fiu-tber agrees that its construction activities shall not unreasonably interf�re with the use, occupancy or enjoyment of any part of any other Party's Lot by the other Party or its Permittees. C. Each Party agrees to defend, indemnify and hold harmless the other Parties from all claims, actions, proceedings and costs incurred in connection therewith (including reasonable attorneys' fees and costs of suit) resulting from any accident, injury or loss or damage whatsoever occurring to any Person or to the property of any Person arising out of or resulting fromthe performance of any construction activities performed or authorized by it except for claims, actions, proceedings, or costs caused by the negligence or willful act or omission of another Party, its licensees, concessionaires, agents, servants, invitees, Permittees, or employees, or the agents, servants, or employees of any licensee or concessionaire thereof I D. Prior to constructing, reconstructing, remodeling, or enlarging a building on a Lot, the owner and tenant of the Lot subject to the foregoing shall give the other Parties at least fifteen (15) days' prior notice of the proposed location of any staging and storage area. All storage of materials and the parking of construction vehicles, including vehicles of workers, shall occur only on the Lot where the work is to be situated unless the other Parties provide prior written consent to also use a specific portion of its Lot. If substantial work is to be performed, the Party engaging in such work shall, at the request of any of the other Pai ties, fence off the staging and storage area. V:XWV%K%EDM0NDSZ1CK'S',REA GDOC VIU11 10 3.2 ImDrovements on Lot 2 A. Upon its election to construct improvements upon Lot 2, Dick's shall cause Lot 2 to be initially improved substantially as shown on the Site Plan with substantial completion of such improvements to be no later than the ninetieth (90,h) day following the date the business on Lot 2 opens for business with the public. Such work shall be done in a good and workmanlike manner and in accordance with good engineering standards. B. The parking area of Lot 2, as augmented by the supplemental and overflow parking easernent described above in paragraph 2.1, shall contain suffibient ground level, standard automobile size, parking spaces in order to comply with the following minimum requirements unless otherwise approved by the Haggen Parties- (i) for retail uses, five (5) parking spaces for each one thousand (1,000) square feet of Floor Area; (ii) for each cinema or theater, .35 parking spaces for each patron seat provided; (iii) for each motel, one (1) parking space for each motel residential unit; (iv) for each apartment building, 1.5 parking spaces for each apartment dwelling unit; (v) for each professional office or medical center, seven (7) parking spaces for each one thousand (1,000) square f�et of Floor Area; (vi) for each congregate care center, one (1) parking space for each bed in the facility; (vii) if a business use contains a drive -up unit (such as remote banking teller or food ordering/dispensing facility), then there shall also be created space for stacking not less than five (5) automobiles for each drive -up unit; and (viii) for each single restaurant which has less than five thousand (5,000) square feet of Floor Area, then five (5) additional parking spaces for each one thousand (1,000) square feet of Floor Area devoted to such use; or (ix) . for each single restaurant which has five thousand (5,000) square feet of Floor Area or more, then ten (10) additional parking spaces Yi'%W?.Ji',EDMQNDS\DICKBTEA GDOC VIIIII for each one thousand (1,000) square feet of Floor Area devoted to such use; The foregoing requirements as well as all governmental regulations, ordinances and similar orders relating to parking shall be satisfied throughout the term of this Agreement and, except for 'the parking spaces available through the overflow parking easement described in paragraph 2.1 above, without reliance on the parking spaces that may be available on Lot 1. In the event of a condemnation of part of Lot 2 or sale or transfer in lieu thereof that reduces the number of usable parking spaces below that which is required, Dick's shall use its best efforts (including using proceeds from the condemnation award or settlement) to. restore' and/or substitute parking spaces in order to comply with the parking requirements set forth above. If such compliance is not possible, Dick's shall not be deemed in default hereunder, but shall not be permitted to expand the aniount of Floor Area located upon Lot 2. If such Floor Area is thereafter reduced, then it may not subsequently be increased unless the parking requirement is satisfied. C. The Parties acknowledge that, as of the date of this REA, the landscape irrigation system on Lot 2 is connected to the landscape irrigation system on Lot 1. At such time as Dick's constructs site improvements on Lot 2, Dick's shall provide a landscape irrigation system on Lot 2 that is connected to the water meter for Lot 2 so that Dick's pays f�r'the cost of the irrigation on Lot 2. 3.3 Building Improvement A. Dick's agrees that the initial building construction on Lot 2 shall be substantially in accordance with the plans attached hereto as Exhibit Q which have been approved by the Haggen Parties. Approval of Plans by the Haggen Parties shall not constitute assumption of responsibility for the accuracy, sufficiency, or propriety thereof, nor shall such approval constitute a representation or warranty that the Plans comply with applicable laws. B. No building or other structure on Lot 2 shall exceed 25 feet in height, unless otherwise approved by the Haggen Parties. No penthouse, parapet mechanical equipment or similar appurtenance located on the roof of such building shall'extend upward above the top of the building more than twelve (12) feet. 3.4 Heavy Construction Activity Black -out Period Except as may be required for emergency repairs or in connection with construction pursuant to Di&s Site Plan, no Party shall engage in excavation, other earth work, or any other construction activity that involves use of heavy equipment on or across the Access Drives, or Shopping Center drive aisles, or the Common Area of another Party during the following periods: (i) from November 17, 2011 through November 24, 2011 and December 18, 2011 through December 25, 2011; and (ii) fi-om November I st to the following January 15th of any year after 2011. YA%VP,R,EDMO1JDS1,D1CKS,,REA G.DOC 2/11/11 12 ARTICLE 4. MAINTENANCE AND REPAIR 4.1 Utilities A. Each Party shall repair and maintain in first-class condition all utility facilities, lines, and systems located on its Lot except 'as otherwise provided by this Agreement or unless the same are maintained by a public or quasi -public utility or authority. B. Each Party shall maintain and repair at its cost any facilities installed pursuant to the easements which exclusively serve its Lot unless the same are granted or dedicated to and accepted by a utility or a governmental agency which agrees to maintain and replace the same. Any maintenance and repair by Dick's of non -dedicated utilities located on Lot I shall be perforined only after two (2) weeks' notice to the Haggen Parties (except in an emergency where the work may be initiated with reasonable notice) and shall be performed in such a manner as to cause a's little disturbance in the use of Lot I as is practicable under the circumstances. Dick's agrees to promptly pay all costs and expenses associated therewith to diligently complete such work- as quickly as possible and to promptly clean the area and restore the affected portion of Lot I to a condition equal to or better than the condition which existed prior to the commencement of such work. C. Regardless of the provisions of Section 2.3 above, any hazardous materials (as defined under any and all applicable State, Federal or local law or regulation) contained in the Storm Drainage System prior to the date of mutual execution of this Agreement shall be the responsibility of the Haggen Parties. Otherwise, the, responsibility shall remain the responsibility of the owner of the Lot from which such hazardous materials were released except to the extent caused by another Party or Permittee thereof where such Party or Perrriittee(s) shall then be responsible. 4.2 Building Improvements In the event any of the building improvements on any Lot are damaged by fire or. other casualty (whether insured or not), each party immediately shall remove the debris resulting from such event and provide a security barrier and within a reasonable time thereafter shall either (i) repair or restore the building improvements so damaged, such repair or restoration to be performed in accordance with all provisions of this Agreement, or (ii) erect other building imp�rovements in such location, provided all provisions of this Agreement are complied with, or (iii) demolish the damaged portion of such building improvements and restore the area to an attractive condition. Each Party shall have the option to choose which of the foregoing alternatives to perform, but each party shall be obligated to perform one of such alternatives. Each Party shall give notice to the other party within ninety (90) days from the date of such Y:XWP,-.H',EDM0NDS\D[CK'S%REA GDOC 13 casualty of w1iich alternative it elects, but in no event shall the selection of one alternative preclude a Party's ability to subsequently switch to another alternative. 4.3 Access Drives The Haggen Parties shall maintain the access drives located on the portions of Lot I that provide access to Lot 2 ("Access Drives") in smooth and evenly covered condition and repair, including snow removal, painting lines on the Access Drives� maintaining traffic signs in the Access Drives, resurfacing and other maintenance and repairs to the surface of the Access Drives. Dick's shall reimburse the Haggen Parties its proportionate share (based on the total square footage of Floor Area on Lot 2 divided by the total square footage of Floor Area on Lots I and 2 combined) of the costs incurred or paid by the ' Haggen Parties in. maintaining the Access Drives as set forth in this paragraph. Notwithstanding the foregoing, in the event that, maintenance or repairs are needed as a result of the negligence or willful misconduct of either party, a breach of this Agreement by either party or by construction activity on either Lot, then the responsible party shall be solely responsible for the cost of such repairs. The responsible party shall promptly pay its share of the costs of maintaining and repairing the Access Drives within thirty (30) days after receipt,of an invoice setting forth the total amount paid and the responsible party's share. If the responsible party fails to pay its proportionate share when due, the unpaid amounts together with all accrued interest that the responsible paily owes the other party p I ursuant to, this section shall constitute a lien upon the responsible party's right, title and interest in and to its Lot to secure repayment of such amounts, from the date the payment is made until paid in full. The injured party shall have the right but not the obligation, to record its lien. The responsible party shall execute such instruments as the other party may reasonably request to permit the recordation of such lien. Each party hereby irrevocably designates the other as its attomey-iii-fact for the purpose of recording its lien pursuant to this section. The injured party shall have the right to foreclose such lien in the manner provided by law. The injured party may charge interest pursuant to Section 6.2 below, from the date payment is overdue. ARTICLE 5. OPERATIONS OF SHOPPING CENTER 5.1 Uses A. No part of Lot 2 shall be used for other than retail sales or services, or commercial purposes. Retail service uses shall mean food and beverage service, financial institutions, real estate and stock brokerage offices, travel or insurance agencies and similar uses providing services directly to the public for retail fees. B. The following uses shall not be permitted on Lot 2, without the prior written consent of the Haggen Parties: Y:WY0E0%40NDS`-D1CKT.REA GDOC VIVII 14' (i) Any use which emits an obnoxious odor, noise, or sound which can be heard or smelled outside of any building on Lot I (excluding odors typically generated by restaurants); (ii) Any operation primarily used as a warehouse operation and any assembling, manufacturing, distilling, refining, smelting, agricultural, or mining operation; (iii) Any "second hand" store or "surplus" store; (iv) Any mobile home park, trailer court, I ' abor camp, junk�ard, or stockyard (except that this provision shall not prohibit the temporary use of construction trailers during periods of construction, reconstruction, or maintenance); (v) Any dumping, disposing, incineration, or reduction of garbage (exclusive of garbage compactors located in the rear of any building); (vi) Any fire sale, bankruptcy sale (unless pursuant to a court order) or auction house operation; (vii) Any central laundry, dry cleaning plant, or laundromat; provided, however, this prohibition shall not be applicable to on -site service oriented to pickup and delivery by the ultimate consumer, including nominal supporting facilities, as the same may be found in first-class retail shopping districts in the Edmonds, Washington metropolitan area; (viii) Any automobile, truck, trailer or recreational vehicle sales, leasing, display or repair; (ix) Any bowling alley; (x) Any skating fink; (xi) Any living quarters, sleeping apartments, or lodging rooms; (xii) Any veterinary hospital or animal raising facilities (except that this prohibition shall not prohibit pet shops); (xiii) Any mortuary; (xiv) Any 'establishment selling or exhibiting pornographic'materials; Y.,ArFUf%EDMONDSIDICK'SWA G.DOC MIA I 15 (xv) Any bar, tavern, restaurant or other establishment whose reasonably projected annual gross revenues from the sal ' e of alcoholic beverages for on premises consumption exceeds fifty percent (50%) of the gross revenues of such business; (xvi) Any health spa; (xvii) Any theatre; (xviii) Any flea market, amusement arcade, pool or billiard hall, car wash or any other place of amusement or recreation such as dance hall, game room, exercise facility, massage parlor, bingo parlor, or teen night club; (xix) Any health care facilities such as a clinic, medical office, dental office, chiropractic office or optornetric office;. (xx) Any unlawful or illegal purpose; (xxi) Any use that is a public or private nuisance; (xxii) Any supermarket, meat market or department, grocery market or department, vegetable produce market or department, fruit produce market or department, bakery or bakery department, dairy store or department, delicatessen or delicatessen department, or any other store or. business establishment selling food (except for permitted restaurants), whether at retail or wholesale. Notwithstanding the foregoing restriction, a fast food restaurant may be developed and operated on Lot 2, provided that in no event shall the allowance of such restaurant permit the operation of a delicatessen on Lot 2; (xxiii) Any facility for the sale of health and beauty products, including prescription drugs and medications; (xxiv) The use of more than ten percent (10%) of the Floor Area for office purposes provided that support office space serving an on -site retail or restaurant facility shall not be considered use for "office purposes" under this limitation. C. The name "Haggen" or "Top" shall not be used to identify Lot 2 or any business or trade conducted on Lot 2 without the Haggen Parties' prior written authorization with may be withheld in their sole and absolute discretion, provided, however, that Dick's may describe its Edmonds location as being "in the N.E. corner of the Top Food & Drug parking lot on Highway 99 at 220'h in Edmonds". Y:VPff.EDMONDS%DICK'S\REA GDOC VIIIII 16 D. No portion of Lot 1, as may be subsequently subdivided, shall be used for a fast food hamburger restaurant or quick service hamburger restaurant, which prohibition includes without limitation a McDonalds, Burger King, Wendy's, Fat Burger, Red Mill Burgers, Red Robin, Burgermaster, Kidd Valley, Zips, and the like. 5.2 Insurance A. Each Party shall maintain or cause to be maintained in full force and effect Comprehensive Public Liability Insurance in such amounts * as that Party determines in its sole discretion. Such insurance shall include the following provisions: (i) shall provide that the policy may not be cancelled or materially reduced in amount or coverage without at least thirty (30) days prior written notice by the insurer to each insured and any additional insureds; (ii) shall name the other Parties as additional insureds; (iii) shall provide for severability of interests; (iv) shall provide that an act or omission of one of the insureds or additional i fisureds which would void or otherwise reduce coverage, shall not reduce or void the coverage as to the other additional insureds of the insured, respectively; and (v) shall provide for contractual liability coverage with respect to the indemnity obligation set forth below. Dick's covenants and agrees to indemnify, defend and hold harmless. the Haggen Parties and the owner of Lot I from and against all claims, costs, expenses and liability (including reasonable attorneys fees and cost of suit incurred in connection with all claims) including any action or proceedings brought thereon, arising from or as a result of the injury to or death of any Person, or damage to the property of any person which shall occur on Lot 2, except for claims caused by the negligence or willful act or omission of the Haggen Parties, its licensees, concessionaires, agents, servants, invitees, Permittees, or employees, or the agents, servants, or employees of any licensee or concessionaire thereof The Haggen Parties covenant and agree to indemnify, defend and hold harmless Dick's and the owner of Lot 2 fi-om and against all claims, costs, expenses and liability (including reasonable attorney's fees and cost'of suit incurred in connection with all claims) including any action or proceedings brought thereon, arising from or as a result of * the injury to or death of any Person, or damage to the property of any person which shall occur on Lot 1, except for claims caused by the negligence or willful act or omission of Dick's, its - licensees, concessionaires, a ents, servants, invitees, Permittees, or employees, or the agents, .9 servants, or employees of any licensee or concessionaire thereof GDOC 2111/11 17 B. Prior to commencing any construction activities on its Lot, the constructing Party shall obtain or require its contractor to obtain and thereafter maintain so long as such construction activity is occurring, at least the minimum insurance coverages set fol th below: (i) Workers' Compensation - statutory limits (ii) Employers Liability - $100,000 (iii) Comprehensive General and Comprehensive Auto Liability as follows: (a) ' Bodily Injury - $ 1,000,000,per occurrence; (b) Property Damage - $ 1,000,000 per occurrence; (c) Independent Contractors liability. or Owner's -Protective Liability; same coverage as set forth in (a) and (b) above; (d) Products/Completed Operations Coverage, which shall be kept in effect for two (2) years after completion of work; (e) "XCU" Hazard Endorsemcnt, if applicable; (f) "Broad Form" Property Damage Endorsement; (g) "Personal Injury" Endorsements; (h) "Blanket Contractual Liability" Endorsement. If the construction activity includes another Party's Lot, then the owner of said Lot shall be an additional named insured and such insurance shall provide that the same shall not be canceled without at least thirty (30) days prior written notice to the named insureds. If such insurance is canceled or expires then the constructing Party shall immediately stop all work on or use of the other Party's Lot until either the required insurance is reinstated or replacement insurance obtained. 5.3 Liens In the event any mechanic's lien is filed against a Party's Lot as a result of services performed or materials furnished for the use of the other Party's Lot, the Party causing the lien agrees to cause such lien to be discharged prior to entry of final judgment (after all appeals) for the foreclosure of such lien and further agrees to indemnify, defend, and hold harmless and indemnify the other Party against liability, loss, damage, costs or expenses (including V:%WF�H; 'EDMONDSOICKSTFA G.DOC MMI 18 reasonable attorneys' fees and cost of suit) on account of such claim of lien. Upon request of the Party whose Lot is affected, the other Party agrees to promptly cause such lien -to be released and discharged of record, either by paying the indebtedness which gave rise to such lien or by posting bond or other security as shall be required by law to obtain such release and discharge. Nothing herein shall prevent the Party causing the lien from contesting the validity thereof in any manner it chooses so long. as such contest is pursued with reasonable diligence. In the event such contest is determined adversely (allowing for appeal to the highest appellate court), Party causing the lien shall promptly pay in fall the required ainount, *together with any interest, penalties, costs, or other charges *necessary to release such lien. ARTICLE 6. MISCELLANEOUS 6.1 Default A. If a Party fails to comply with any provision herein, (the "Non -Performing Party"), then the other Parties may, upon forty-five (45) days'prior written notice to the Non- Perfonning Party, proceed to cure the default (and shall have a license to do so) by the payment of money or performance of some other action for the ' account of the Non - Performing Party. The foregoing right to cure shall not be exercised if within the forty-five (45) day notice period (i) the Non-Perforining Party cures the default, or (ii) if the default is curable' ' but cannot reasonably be cured within that time period, the Non -Performing Party begins to cure such default within such time period and diligently pursues such action to completion. The forty-five (45) day notice period shall not be required if, using reasonable judgment, a Party deems that an emergency exists which requires immediate attention. In the event of such an emergency, the Parties shall give whatever notice to the Non -Performing Party as is reasonable under the circumstances. B. Within ten (10) days of written demand (including providing copies of invoices reflecting costs) the Non -Performing Party shall reimburse the other Parties for any sum reasonably expended by them to cure the default in accordance with this Agreement, together with interest thereon. The Non-Perforining Party hereby giants to the other Parties non-exclusive casements over and under any and all parts of their respective Lot for all purposes reasonably necessary to enable the Parties (or their agents, contractors or subcontractors) to perform any of the terms, provisions, covenants, or conditions of this Agreement that the Non -Performing Party is obligated to perforrn but has failed to perform after notice and time to cure pursuant to this.Section 6. 1. C. Tlie unpaid amounts together With all accrued interest that the Non - Performing Party owes the other Parties pursuant to this section shall constitutea lien upon the Non -Performing Party's right, title. and interest in and to the Non -Performing Party's Lot to secure repayment. of such amounts. The Parties shall have the right, but not the obligation, to record its lien. The Non -Performing Party shall execute such instruments as the other.Parties V.1WMMEDM0NDS%D1CK'S\REA G.DOC 2/11111 19 may reasonably request to permit the recordation of such lien. The Non. -Performing Party hereby irrevocably designates the othe*r Party as the Non-Perfaiming Party's attorney -in -fact for the purpose of recording its lien pursuant to this section. The other Party shall have the right to foreclose such lien in the manner provided by law. D. In the event any Party shall institute any action or proceeding against another Party relating to the provisions of this Agreement, or if any default hereunder, or to collect any amounts owing hereunder, or if an arbitration proceeding is commenced by agreement of the Parties to any dispute, the unsuccessful litigant in such action or proceeding shall reirnburse the successful litigant therein for costs and expenses incurred by the successful litigant in connection with such action or proceeding and any appeals therefrom, including attorneys' fees and court costs. E. All remedies are cumulative and shall be deemed additional to any and all other remedies to which the Parties may be entitled in'law or in equity. The Parties shall also have the right to restrain by injunction any violation or threatened violation by a Party of any of the terms, covenants, or conditions of this Agreement, or to obtain a decree to compel performance of any such terins, covenants, or conditions, it being agreed that the remedy at law for a breach of any such term, covenant, or condition (except those, if any, requiring the payment of a liquidated sum) is not adequate. 6.2 Interest Wherever and as often as a Party shall not have paid any sum payable hereunder to any other Party within five (5) days of the due date, the Party to make payment shall pay interest on such amount from the due date to and including the date such payment is received by the payee, at the lesser of - A. The highest rate permitted by law to be paid on such type of obligation; or B. Three percent (3%) per annum in excess of the prime rate from time to time publicly announced by U.S. Bank, or its successor. 6.3 Notices All notices, demands, statements, and requests (collectively the "notice") required or permitted to be given under this Agreement must be in writing and shall be deemed to have been properly given or served as of the date hereinafter specified: (i) on the date of personal service upon the person to whom the notice is addressed or if such person is not available the date such notice is left at the address of the person to whom it is directed, (ii) on the date the notice is postmarked by the United States Post Office, provided it is sent prepaid, registered or certified mail, return receipt requested, and (iii) on the date the notice is delivered by a courier service (including Federal Express, Express Mail, Emery or similar operation) to the address V:;WP-.H%ED1M0NMDJCK'S,KEA GDOC 20 of the person to whom it is directed, provided it is sent prepaid, return receipt requested. The address of the signatories to this Agreement is set forth below. Dick's: Dick's Drive -Ins, Ltd., L.P. 4426 — 2"d Avenue N.E. Seattle, WA 98105 Attn: Jim or Walt Spady With a copy to: Lasher Holzapfel Sperry & Ebberson PLLC 601 Union Street, #2600 Seattle, WA 98 101 Attn: Eugene W. Wong Haggen Parties: Briar Development Company LLP P.O. Box 489 Bellingham, Washington 98227 Attn: Gary Hall With a copy to: GordonDerr, LLP 2025 First Avenue, Suite 500 Seattle, WA 98121 Attn: Joel M. Gordon Each Party shall have the right from time to time and at any time, upon at least ten (10) days' prior written'notice thereof in accordance with the provisions hereof, to change its respective address and to specify any other address within the United States of America; provided, however, notwithstanding anything herein contained to the contrary, in order for the notice of address change to be effective it must actually be delivered. Refusal to accept delivery of a notice or the inability to deliver a notice because of an address change which was not properly communicated shall not defeat or delaythe giving of a notice. 6.4 Approval Rights Unless otherwise herein provided, whenever a Party's approval or consent is required, such approval or consent shall not be unreasonably withheld, conditioned, or delayed. Unless provision is made for a specific time period, approval shall be given or withheld within thirty (30) days of the receipt of the request for approval. If disapproval is not given within the required time period, the relevant Party shall be deemed to have given their approval or consent. If a Party shall disapprove, the reasons therefor- shall be stated. Except with respect to an approval given by lapse of time, all approvals and disapprovals shall be in writing. The "right to approve" herein reserved by the Haggen Parties shall be assignable, but only to a maximum of two (2) Parties and such Parties must either own or lease the majority of the Floor Area of Lot I as originally configured on the date of this Agreement. Dick's may assign its "right to approve7' but only to a new Party that either owns or leases Lot 2 in its W. WPI&IMMONDSOICKSkREA G.D0C 2111/11 21 entirety. Each successor assignee, in turn, may also assign such "right to approve" to a maximum of one (1) Party on the same condition. If the holder of the "right to approve" transfers its entire ownership interest prior to assigning such "right to approve", then the transferee Party shall immediately become vested with such "right to approve". 6.5 Binding Effect The terms of this Agreement and all easements granted hereunder shall constitute covenants running with the land and shall inure to the benefit of and be binding upon the signatories hereto and their respective successors and assigns who.become Parties hereunder. This Agreement is not intended to supersede, modify, amend, or otherwise change the provisions of any prior instrument affecting the land burdened hereby. 6.6 Singular and Plural Whenever required by the context of this Agreement, the singular shall include the plural, and vice versa, and the masculine shall include the feminine and neuter genders, and vice versa. 6.7 CounteKparts and Signature Pages This Agreement may be executed in several counterparts, each of which shall be deemed an original. The signatures to this Agreement may be executed and notarized on separate pages, and when attached to this Agreement shall constitute one complete document. 6.8 Negation of Partnership None of the terms or provisions of this Agreement shall be deemed to create a partnership between or among the Parties in their respective businesses or otherwise, nor shall it cause them to be considered joint venturers or members of any joint enterprise. Each Party shall be considered a separate owner, and no Party shall have the right to act as an agent for another Party, unless expressly authorized to do so herein or by separate written instrument signed by the Party to be charged. 6.9 Not a Public Dedication Nothing herein contained shall be deemed to be a gift or dedication of any Lot or portion thereof to the general public, or for any public use or purpose whatsoever. Except as herein specifically provided, no right, privileges or immunities of any Party hereto shall inure to the benefit of any third -party Person, nor shall any third -party Person be deemed to be a beneficiary of any of the provisions contained herein. V,WP,,1fEDMONDS'01CK'MEA O.DOC 211/11 22 6.10 ExcusableDclUs Whdnever performance is required of any Party hereunder, that Party shall use all due diligence to perform and take all necessary measures in good faith to perform; provided, however, that if completion of performance shall be delayed at any time by reason of acts of God, war, civil commotion, riots, strikes, picketing or other labor disputes, unavailability of -labor or materials, damage to work in progress by reason of fire or other casualty, or any cause beyond the reasonable control of a Party, then the time for performance as herein specified shall be appropriately extended by the arno unt of the delay actually so caused. The provisions of this section shall not operate to excuse any Party from the prompt payment of any monies required by this Agreement. 6.11 Severability Invalidation of any of the provisions contained in this Agreement, or of the application thereof to any person by judgment or court order shall in no way affect any of the other provisions hereof or the application thereof to any other person and the same shall remain in full force and effect. 6.12 Amendments This Agreement may be amended by, and only by, a written agreement signed by all of the then current Parties and shall be effective only when recorded in the county and state where the Lots are located. No consent to the amendment of this Agree , ment shall ever be required of any Occupant or Person other than the Parties, nor shall any Occupant or Person other than the Parties have any right to enforce any of the provisions hereof. 6.13 Captions and _Cqpitalized Terms The captions preceding the text of each *article and section are included only for convenience of reference. Captions shall be disregarded in the construction and interpretation of the Agreement. Capitalized terms are also selected only for convenience of reference and do not'necessarily have any connection to the meaning that might otherwise be attached to such term in a context outside of this Agreement. 6.14 Minimization of Damages In all situations arising out of this Agreement� all Parties shall attempt to avoid and minimize the damages resulting from the conduct of any other Party. Each Party hereto shall take all reasonable measures to effectuate the provisions of this Agreement. V:%WPW,EDM0NDS*,D1CKS�REA G.DOC 23 6.15 A14reement Shall Continue Notwithstanding Breach It is expressly agreid that no breach of this Agreement shall (i) entitle any Party to cancel, rescind or, otherwise terminate this Agreement, or (ii) defeat or render invalid the lien of any mortgage or deed of trust made in good faith and for value as to any part of the Lots. However, such limitation shall not affect in any manner any other rights or remedies which a Party may have hereunder by reason of any such breach. 6.16 Time Time is of the essence of this Agreement. 6.17 Non Waiver The failure of a Party to insist upon strict performance of any of the terms, covenants or conditions hereof shall not be deemed a waiver of any rights or remedies which they may have hereunder or at law or equity and shall not be deemed a waiver of any subsequent. breach or default in any of such tenns, covenants or conditions. ARTICLE 7. TERM 7.1 Term of this Agreement This Agreement shall be effective as of the date Dick's becomes the fee simple owner of Lot 2 and shall continue in full force and effect until 11:59 p.m. on December 31, 2059. In the event Dick's does not become the fee simple owner of Lot 2 pursuant to the REPSA, this Agreement shall become void ab initio. Upon termination of this Agreement, all rights and - privileges derived from and all duties and obligations created and imposed by the provisions of the Agreement, shall terminate and have no fin-ther force or effect; provided, however, that the termination of this Agreement shall not limit or affect the Haggen Easement, the Storm Drainage Easements, or any remedy at law or in equity that a Party may have against any other Party with respect to any liability or obligation arising or to be performed under this Agreement prior to the date of such tennination. [Intentional Page Break] Y:I.WP',,11',r-DMONDS',DICK'S%REA G.DOC V11111 24 IN WITNESS WHEREOF, the Parties have caused this Agreement to be executed effective as of the day and year specified in Section 7.1 above. DICK'S: DICK'S DRIVE-INS, LTD., L.P., a Washington limited partnership M Its Date Y.',WPff,EDM0ND5-D1CK&UA G.DOC HAGGEN PARTIES: BRIAR DEVELOPMENT COMPANY LLP, a Washington limited liability partnership By_ Its Date HAGGEN, INC., a Washington corporation By_ its Date 25 STATE OF WASHINGTON ss' COUNTY OF I certify that I know or have satisfactoiy evidence that signed this instrument, on oath stated that be was authorized to execute the instrument and acknowledged it i'n his capacity as the of Briar Development Company LLP to be the free and voluntary act of such partnership for the uses and purposes mentioned in the instrument. Dated this day of 32010. (Signature) (Printed Name) Notary Public in and for the State of Washington, residing at My commission expires. STATE OF WASHINGTON ) )ss. COUNTY OF I certify that I know or have satisfactory evidence that signed this instrument, on oath stated that he was authorized to execute the instrument and acknowledged it in his capacity as the of Haggen, Inc. to be the free and voluntary act of such partnership for the uses and purposes mentioned in the instrument. Dated this — day of 12010. V:,WP%MEDM0ND5%D1CK'S,REA GDOC 2111111 (Signature) (Printed Name) Notary Public in and for the State of Washington, residing at My commission expires 26 STATE OF WASHINGTON ) )ss. COUNTY OF I certify that I know or have satisfactory evidence that iped this instrument on oath stated that he was authorized to execute the instrument and acknowledged it in his capacity as the of Dick's Drive -Ins, LTD., L.P., to be the free and voluntary act of such company for the uses and purposes mentioned in the instrument. Dated this — day of 12010. Y:'kWP&1EDM0NDS*01CK'SaEA GDOC 211111 (Signature) (Printed Name) Notary Public in and for the State of Washington, residing at My commission expires 27 " , It EXMB1T A TO R-EA LEGAL DESCRIPTION OF LOT 2 Parcel No. 005807-000-040-08 LOT 2 THAT PORT14UN OP-TqACT 40, SOLMER'S FIVE ACRE TRACTS, A"DRDMO TO THE PLAT THEREOF PEOGROEI) iN VOLIME 7 OP PLATS, PA -GE Z6, RECORDS Or SUDHOMISK COUNTY. '01ASHINi3TON DESCRIBED A5 FQLLPWS! COPMENCING AT THE MTIERSE(MON OF THE R04TH LINE OF SAIP TRACT 40. WIT8 THE WESTERLY Riowr or wAy m4poi-.4 oF S7ATF 441CFWAY SR S9 JP.S.H, NO. ��. THENCE SOUTH 25*45'2e:Y' WEST ALONG SAID -%%SSTFRLY MARGM A G.'STANCE OP 9a. 17 PEET TO A POI NY ON A CURVE M TH5 ILEPT FROM WHICH THE CENTER BEAR$ SOUTF1 65#30'55- V)CST� 25.00 rMF DISTANT: 7HENrE NORTHAIESTERLY ALONG THE ARC 09 SAID CURVE THROU-$H A CENTPAL ANGLE OF 39'47'30' FOR AN ARC LFMGTH OF 17-36 FEET70 A POINT OF TANGENCY; THENCE NORTH 64'46'-31" %VF5T A DISTANCE OF li--$7 M&T TO THE POINT OF BEGINNIM; THENCE �COKTFNOINC NORTH 64*iG'3i" 'UNEST A DI$TAKICE OF 4e.42 FEET TO T11E BEGINNINO Oft A TA146EIYT CURVE TO THE LEFT HAVINe A RA01US OF 50,0!Z� FEET, TmENCE WESTERt-Y AL0146 'ME APC OP SAID CU�Zvrm 1*��'OU06H A CENTRAt, AmOLE 24'-54'00" FOP AN ARC LrMGT`H OF 21.73 FEET TO A POtNT Of TANOENOYi THENCE NORTH aa*?Q'W VIIE$r A DISTANCE OF 163 85 rEET; THENCE 50VTH 25'43':?9- WEST A DISTANCE OF 106.84 FEZTj THENCE SOOTH 64'i6**-'-I' EAST A DISTANCE OF 153.29 FEET TO THE aK6tMNJN6 OF A TAtMENT CURVE TO THE: RIGHI.- 144VING A RADIUS OF 17.50 FEET; THENCE S00-it-I-EASTERtY ALOMa THE APO OF SAID CURVt TKRGVGH A CIZNTRAL ANGLE OF 27*4$'40" FOR AN ARC L8NOTH OF 8.49 �'f�T TC) A POiNT OF TMOEtiCy: TKENCE SQUT44 -36*27'51" MST A 015TANCE OF .58,33 FEET. lHeNCE SOUTH 42'54'0�' E.AST A bisrANCES OF 1?. 14 F!�!E"T TO A POINT ON A OUPVE TO tHe LEFT FRr.4.4 WMCH THE CENTER BEAR'S 14ORTH 42 -0 1 05- WE!; r at-54 FEET D I STANT z THENCE. NOkt,'HI�AS fit-4LY AILONO THE ARC OF SAID CURVE THROUGH A CERTRAI, ANGLE OF rOP AN APO LEWTH OF 3-5.82 FEET TO A PO.MT or TAMC�rE-NLI.Yj THENCE N'OPTH R5*43'2'9- EAST A DISTANICE OF 072.09 FEET TO THE ROW OP BEGIMNIN0. EXHIBIT B TO REA LEGAL DESCRIPTION OF LOT I LOT 1, CITY OF EDMONDS SHORT PLAT RECORDED UNDER AUDITOR'S FILE NUMBER 200307295008, RECORDS OF SNOHOMISH cbuNTY, WASHINGTON, BEING A PORTION OF TRACTS 40,41 AND 42, SOLNER'S FIVE ACRE TRACTS, ACCORDING TO THE PLAT THEREOF, RECORDED IN VOLUME, 7 OF PLATS, PAGE 25, RECORDS OF SNOHOMISH COUNTY, WASHINGTON, LOTS 4 THROUGH 9, BLOCK 1 AND LOTS 6 THROUGH 11, BLOCK 2, PINE -LAND ADDITION, ACCORDING TO THE PLAT THEREOF, RECORDED, IN VOLUME 13 OF PLATS, PAGES 50 AND 51, RECORDS OF SAID COUNTY, LOTS 6 THROUGH 11, WILLERS ADDITION, ACCORDING TO THE PLAT THEREOF, RECORDED IN VOLUME 14 OF PLATS, PAGE 13, RECORDS OF SAID COUNTY, AND PORTIONS OF VACATED 219TH STREET S.W. AND VACATED 218TH STREET S.W. SITUATE IN THE COUNTY OF SNOHOMISH, STATE OF WASHINGTON. a J, .41 EXHIBIT C TO REA SITE PLAN 7 r r LE -RAIN Wb&�. TRA.SH EN IN f I LANDSW Q PLANTERS r If /* MET FRAT CATION, V /* h MY IF M-ff[W 19 Site Layout 4 1 , -A EXHIBIT D TO REA DICK'S APPROVED PLANS 10 37,.A Hi I--,- iR-11 IIXKTI: fIA-I IFF 7TT---T--7---F--r-I -1 I u let If ------------ ---------------------- - ------ I II-1 �14. 371,4 -7rrl 4 V 371. A .14 37... D5 4-m r I - - - ME N ` L ...... 4 * , 'a EXHIBIT E TO REA FORM EASEMENT AGREEMENT [To be inserted] City of Edmonds Traffic impact Analysis Works:heet::.'. .Name of Proposed Project: . .... .... . Owner/ApWicant OvA<!s S LTD., L. P, Name 'i q:z (0 AOF— NIE Sireet/MailinR Address E- N-TT L G 10, S, City State zip Telephone: ;�069 &3f - 0300 THMHOLD LEVELS OFANALYSIS Applicant Contact Person: \-."\ � VA � . � �-- P, (-� �-- r E: Name 10IR6 ;�t- Prue "e Street/Mailing Address 594 -r-fi. WA ct,�YJ05�- City State zi �p Telephone:. ;�C& N— 0,3CrD' Proieoi:T .. . .. .... clevels ons to. com6lete: 1. tess than 25 peak-hout tri. d I and 7 6 1 (Worksheet/Checkli 'ps generate Y: .. ... ... If. More than 25 peak -hour tripsgenerated All: secdons: 1. PROJE CT DESCRIPTION a. Location � Street address: 4�61& oAe4� 4�&k aj,�l _(Agachayidnity: #�qg al0d:sile pknd b. Specify existing land Use, c. Specify. proposed type And site of development' 1!jRf1AA'—Ze7L Aa�fllo� Oofresi&ntialunirsan Worsquaref otagne of bdilding) APPROVT--'D BY RECEIVED N, 10. 1 N "I h's G Revised on 6124110 k82 - -�rqflzc Impact Analysis Worksheet 2011 bate: DEVELOpMENT SERVICES CTR. C17Y OF EDMONDS "'TREET FILE d. Date construction will begin and be, completed: e. Define proposed: access locations- f. Define p!Dposed sight distance at site egress locations: _A0. 11� i;X' 2. TRIP GENERATION Source shall be the Eighth Edition of the Institute of Transportati9iiEngineers, (YM) Trip Generation . .. . .. .... manual. For independent fee calculations. the current edition of the rFE- manual in Y be used. APT = Average Daily Traffic PM Peak -hour trips (AM, noon or school peak may also. apply 49, directed Wthe City Engineer), a. Existing Site Trio Generation Table: b. Proposed Project Trip Generation Table - Land Use Daily (APT) IN OUT: op tvt 43� c. Net New Project Trip Generation Table: Land Use Dai ly (ADT) d. State assumptions and methodology for internal, link -diverted or passby trips: Revised on 6124110 E82 - Traffic Impact Analysis Worksheet Page 2 of 5 3. TRIP: DISTRIBUTION Prepare, and attach a graphic showin c distr ibutiori bereen�agqs:and assignments. For proje . t trip,_ devel ment that generate: over 75 ity op ..8 1p�ak-hotir trips,th6 C"' Enigineer reserve9the rikht toi.tpire trip distribut.i.on to be determined through use of the City traffic.� model. 4. 81TE ACCESS ROADWAYIPRIVEWAYS AND: SAFETY a. Have sight distance requirem .pots 4tegres$ location b.peii.rii6t'66r.A.A.S,H:.TO�re��men.ts� . .. ....... .... . b. Intersection Level: of Service (LOS): Analysis- qo: A. 1pe4 'a J�x. Intersections to be evaluxed shall be detennine by f4 City of Edmonds TrqffleEn-gineer - e. If appropriate, state traffic control warrants (e.g. !Aop sign wgrAnts, signal warrants): f. Stinimarize local accident history! (only req4ired: for access to -principal and.lminbr arterials): nA Fimhilrl ke. i6447. CAW ..... ..... ..... ... 1 Available upon request at City of Ednionds.Develooment. SArvices.Department 7 Available upon request. at City of Edm6h,ds Pol, ice Departi-ni.it .Revised on 6t24110 E82 - Traffic Impact Analy�4 Worksheet, Page 3 of 5 5, TRAFFIC VOLUMES — exa 441�4kl( :the Provide the following and other planned,devd1opment traffic within "city' a. Describe exi sting ADT and peak7hour counts fless..than tw ears. old), includ I ing ty ming movements, on street adjacent to. and directl impacted by the,project; �y b. Describe the estimated ADT and pea k�houf counts, including tufning:MbVdm605i.th6 year the c. Describe. the estimated ADT and pdak-hour counts, including. turning movements,, five, years, after the project has been fully open (with: and withou . t project traffic). d. State annual, background traffic growth factor and source; 6. LEVEL OF SERVI C*E (LOS) ANALYSIS 5�,Z 4410� a. Summarize Level of Service Analysis below and. attach supporting LOS: Provide: the following, docu mentation for each arterial street or arterial intersection, impactod. by ten or more peak -hour trips. Other. City -planned developments' must also b:'e f::ac:to:r*ed:into t - LOS calculations. to.& LOS Exigting Conditions Existing Delays, .... . ........ . Year of Oponing: With Project Without ProjePU . .. ........ . . d WithRoject Without Project. FiveYears:13eyon Changed'i Land Use b. Note any assurnotions/variations to standard analysis default values and justifications: A list of planhed developments are available at the City upon request for public records kevised on 6124110 E82 - Traffic Impact Analysis Worksheel Page 4 qfS, ITE la nd Use Category I PerUnit I Fee Rate New:Use 0 OTHER Cit of Edniotidg,*EogineeringDIV'Lsion.Approval.:- Patp Fee No imr)act fees will be due, nor will a credit be given, for an impact fee ca lcu lation resulting,in a net! negative. Revised on 6124110 E62 - Traffic Impact Analysis Warksheet. Page �5 of 5 Transportation Engineering. NorthWest, LLC Memorandum df"Or�ONA-r,y N. DATE: January 31, 2011 % C TO: Bertrand Hauss, P.E. 0: City of Edmonds 3.345 FROM: Nfichaelj. Read, P.E. Transportation Engineering Northwest, LLC NAL RE: Dick's Drive -In Restuarant, Edmonds, WA — Traffic Impact Study P�PIRES 2 28111 I This report summarizes traffic impacts associated with Dick's Drive -In, a proposed fast-food restaurant in Edmonds, WA. This study addresses the following traffic impacts associated with the proposed action as requested by the City of Edmonds: > Description of proposed project. > Summary of existing conditions through field reconnaissance and planning documents. > Estimation of vehicular weekday p.m. peak hour trips generated by the proposed action. > Assignment of weekday p.m. peak hour project trips onto the existing roadway network. > Evaluation of level of service (LOS) impacts at one (1) off -site study intersection and 2 project site access intersections. > Assessment of site access, safety, and circulation issues in relation to increased driveway use and vehicle queuing conditions along SR 99. > Identification of mitigation measures to maintain acceptable levels of mobility and safety based upon City of Edmonds and the Washington State Department of Transportation (WSDOT) standards and guidelines. Project Description ne proposed development would construct up to 3,800 square feet of a fast-food restaurant. The project site is located at 21910 Mghway 99 (in the general vicinity of the northwest comer of the SR 99 and 220thStreet SW intersection) in Edmonds, WA. A project site vicinity map is shown in Figure 1. ne project site would be located within the northeast quadrant of an. existing retail complex containing a Top Foods and Bank of America. There are two existing driveways onto SR 99 and one existing driveway onto 220t" Street SW which would be utilized by the proposed Dick's Drive -In Restaurant. A project site plan is illustrated in Figure 2. Full build -out of the project site is anticipated for completion by the 4th-Quarter of 2011. nx,0�� 6 www.tenw.com PO Box 65254 + Seattle, WA 98155 9,11ilz Office/Fax (206) 361-M3 + Toll Free (888) 220-7333 STREET FILE i ­ i4 Transportation Figure I' Engineering Project Site Vicinity NorthWest, LLC I Transportation Engineering Northwest, LLC PO Box 65254 * Seattle, WA 98155 Office/Fax (206) 361-7333 * Toll Free (888) 220-7333 Dick's Drive -In Restaurant Traffic Impact Study January 31, 2011 Page 2 V4&W (Not to Scale) Dick's Drive -In Edmonds, WA Traffic Inipact Study Dick's Drive -In Restaurant Traffic Impact Study January 31, 2011 Page 3 <w4z W cc 0 n J C_. to io.: CD (NottoScale) Transportation Figure 2 Dick's Drive-in. Engineering orthWest, LLC Project Site Plan-. Edmonds, WA Traffic Impact Study Transportation Engineering Northwest, LLC PO Box 65254 * Seattle, WA 98155 Office/Fax (206) 361-7333 * Toll Free (888) 220-7333 Dick's Drive -In Restaurant Traffic Impact Study January 31, 2011 Page 4 Existing Conditions This section includes an inventory of existing roadway conditions, intersection levels of �ervice, and planned roadway improvements. Existing Roadway Conditions SR 99 is classified by WSDOT as an urban principal arteriaL Adjacent to the project site, the roadway consists of 6 travel lanes with a two-way center left-tum lane. Travel lanes are 12 feet with curbs, gutters and sidewalks. The speed limit is posted at 45 mph. 220th Street SW is a four -lane roadway with a two-way center left -turn lane. Travel lanes are 11 to 12 feet with curbs, gutters and sidewalks. The speed limit is posted at 30 mph west and 35 mph east of SR 99. Intersection Level of Service Level of service (LOS) serves as an indicator of the quality of traffic flow at an intersection or road segment. The LOS grading ranges from A to F, such that LOS A is assigned when minimal delays are present and low volumes are experienced. LOS F indicates long delays, heavy volumes, and increased traffic congestion. Table 1 summarizes the delay range for each level of service at signalize * d and unsignalized intersections in the study area. The methods used to calculate the levels of service are described in the updated 2000 Higbway Capaci _* Manual (Special Report 209, Transportation Research Board). The measure of effectiveness for signalized intersections is average control delay, defined as the total time vehicles are stopped at an intersection approach during a specified time period divided by the number of vehicles departing from the approach in the same time period. Level of service for signalized intersections is defined in terms of control delay, which is a measure of driver discomfort, frustration, and increased travel time. The delay experienced by a motorist is made of up a number of factors that relate to traffic control, geometries, traffic demand, and incidents. Total control delay is the difference between the travel time actually experienced and the reference travel tinve that would result during base conditions (i.e., the absence of traffic control, geometric delay, any incidents, or as a result other vehicles). LOS F at signalized intersections is often considered unacceptable to most drivers, but does not automatically imply that the intersection is over capacity. jammed conditions could occur on one or all approaches, with periods of long delays and drivers waiting for multiple signal cycles to progress through the intersection. For unsignalized intersections, a level of service and estimate of average control delay is determined for each minor or controlled movement based upon a sequential analysis of gaps in the major traffic streams and con fEcting traffic movements. In addition, given that unsignalized intersections create different driver expectations and congestion levels than signalized intersections, their delay criteria are lower. Control delay at unsignalized intersections include ' deceleration delay, queue move -up time, stopped delay in waiting for, an adequate gap in flows through -the intersection, and final acceleration delay. Transportation Engineering Northwest, LLC PO Box 65254 * Seattle, WA 98155 Office/Fax (206) 361-7333 * Toll Free (888) 220-7333 Dick's Drive -In Restaurant Traffic Impact Study January 31, 2011 Page 5 Table 1: Level of Service Criteria for Unsigna ized Intersections Level of Service Signalized Intersection Unsignalized Intersection Delay Range (sec) Delay Range (sec) A :5 10 :r. 10 B > 10 to:5 20 > 10 to :5 15 C > 20 to :s 35 > 15 to :s 25 D > 35 to :s 55 > 25 to !s 35 E > 55 to:5 80 >. 35 to :s 50 F a 80 a 50 Source: "Highway Capacity Manual", Special Report 209, Transportation Research Board, 2000, Update. 'Me Highway Ca pado Software (version 4.1e/� was used to evaluate levels of service at signalized and unsignatized intersections. Evaluation of level of service impacts was conducted at the following 1 off -site and 2 site access intersections under 2012 full buildout conditions: 1. SR 99 220" Street SW 2. SR 99 South Driveway 3. SR 99 North Driveway Figure 3 illustrates existing channelization and traffic control at study intersections. Figure 4 shows existing p.m. peak hour traffic volumes at the study intersections in 2011. Peak hour turning movement counts during the p.m. peak hour were conducted by All Traffic Data Services, Inc. and TENW in January 2011. Existing p.m. peak hour levels of service are summarized in Table 2. As. shown, all study intersecdons currently operate at LOS D or better. Detailed level of service summary worksheets are provided in Appendix A. Table 2: 2011 Existing P.M. Peak Intersection Levels of Service Signalized Intersection Movement LOS Delay #1 - SIR 99 / 220th Street SW Signal D 52 Unsignalized Intersection Movement LOS Delay #2- SR 99 South Driveway EB B 14 #3 - SR 99 North Driveway EB C 24 I NB Left B ote: Analysis based on HCS 2000 results using HCM 2000 control delays and LOS. Planned Roadway Improvements The City of Edmonds Six -Year Transportation Improvement Program (77P), 2012-2016, identified no transportation -capacity improvement projects that would be impacted by p.m. peak hour vehicular trips from the proposed project. Transportation Engineering Northwest, LLC PO Box 65254 * Seattle, WA 98155 Office/Fax (206) 361-7333 * Toll Free (888) 220-7333 Dick's Drive-in Restaurant Traffic Impact Study January 31, 2011 Page 6 j6 $top Sign, 'qW (Not W:Scale) Transportation Figure 3 - Dick's Drive-in 1%9 Engineering Existing Channelization Edmonds, WA NorthWest, LLC and Traffic Control I I Traffic Impact Study Transportation Engineering Northwest, LILC PO Box 65254 * Seattle, WA 98155 Office/Fax (206) 361-7333 + Toll Free (888) 220-7333 Dick's Drive -In Restaurant Traffic Impact Study January 31, 2011 Page 7 MAW (Not to Scale) Dick's D.rive-In Transportation Figure 4 Engineering 2011 Existing P.M. Peak. Edmonds, WA NorthWest, LLC Hour Traffic Volumes Traffic Impact Study Transportation Engineering Northwest, LLC PO Box 65254 + Seattle, WA 98155 Office/Fax (206) 361-7333 + Toll Free (888) 220-7333 Dick's Drive -In Restaurant Traffic Impact Study January 31, 2011 Page 8 Traffic Impact Analysis The following section describes transportation impacts the proposed Dick's Dtive-In development would have in the site vicinity. The discussion includes non -project traffic forecasts, new trips generated by the proposed development, distribution and assignment of new project trips, intersection level of service impacts, and an evaluation of site access, safety, and circulation issues. Ncin-Project Traffic Forecasts For the purpose of tl-ds traffic analysis, year 2012 was selected for completion and full utilization of the proj cct, as the restaurant is expected to open in the 4th-Quarter of 2011. Per direction from the City of Edmonds, a 1 percent per year growth rate was used to factor existing traffic volumes to 2012 baseline conditions without the proj ect. Future year traffic volume forecast estimates are provided in Appendix B. Project Trip Generation Dick's Drive -In Restaurants are typically open from 10:30 a.m. to 2:00 a.m. Therefore, only the criticalp.m. peak hour would be used for analysis of traffic impacts requested by the City of Edmonds on driveway operations in proximity to the SR 99 and 220th Street SW intersection. Average trip rate equations compiled by the Institute of Transportation Engineers (ITE) Ttip Generation, e Edition, 2011, were used to estimate daily and p.m. peak hour traffic that would be generated by the proposed development. Average trip rates qTE land use code 933) for fast-food restaurant without drive -through window were used based upon total gross floor area (GFA). Although the proposed Dick's Drim-In Restaurant is located in the same complex as a Top Foods and Bank of America and within walking distance of offices and retail shopping areas, no internal or walk/transit trips were assumed, also making this a "worst -case" trip generation scenario. Pass -by Trips Restaurant land uses have a unique characteristic to their trip generation rates. Many of the trips that will use the restaurant are not "new" trips. They are existing trips that are or will be traveling near the new restaurant site, regardless of whether the restaurant were there or not, but have no reason to stop without the restaurant. These trips are called pass -by trips. Pass -by trips are those traveling on streets immediately adjacent to the site with easy access. Pass -by trips are not considered to have direct impacts on the adjacent transportation facilities because they would be there anyway. It is only the impacts created by existing trips diverted onto different routes and by "new" trips, which would not be made unless the restaurant development occurred, that are considered to be site -specific iransportation impacts by generating additional turning movements into and out of site access driveways. Transportation Engineering Northwest, LLC PO Box 65254 + Seattle, WA 98155 Office/Fax (206) 361-7333 + Toll Free (888) 220-7333 .A Dick's Drive -In Restaurant Traffic Impact Study January 31, 2011 Page 9 There are no reported surveys for pass -by trip rates for the proposed use, Fast Food Restaurant without Drive -Through Pass -by rates identified in the ITE Dip Generadon Handbook, 2004. As such, pass -by surveys for High�Turnover Sit Down Restaurant IJTE Land Use Code 932) and Fast -Food Restaurant with a Drive -Through Restaurant �TE Land Use Code 934) were reviewed. Average pass -by rates for these two uses range between 43 and 50 percent for p.m. peak hour trips. While neither of these land use * categories directly represent the proposed use, some level of pass�by traffic is reasonable to apply given the nature of the proposed restaurant. For this project, a 20 percent pass -by trip reduction assumption was applied as this would reflect a more conservative tr . ip generation scenario. Project Trip Generation Summary Table 3 summarizes estimated trip generation by the proposed action. An estimated net total of 79 p.m. peak hour vehicular trips (40 entering and 39 exiting) would be generated at fall-buildout of the project during the p.m. peak hour of adjacent street traffic. Detailed calculations of project trip generation are provided in Attachment C. Table 3: Pr &ct Trip Gen ration Land Use ITE Land Use Code' Size 2 P.M. Peak Hour' EnterT Exit Total Fast -Food Restaurant without Drive -Through Window 933 3.8 SF GFA 50 49 1 99 20% Reduction for Pass -by Trip -10 -10 -20 Net Trip Generation 40+ 39 79 1 — ITE Tfi P Generafion Manual, 8th Edition, 2011. 2 — SF GFA is square feet of gross. floor area. Trip. Distribution and Assignment Based upon historical traffic volumes and patterns, the vicinity housing/employment/service distribution within the area, and anticipated market corridors by the owner, p.m. peak hour traffic volumes generated by the proposed action would be generally distributed as follows (distribution and assignment are also shown in Figure 5): > 25 percent northerly and 25 percent southerly via SR 99; and > 30 percent easterly and 20 percent westerly via 220'h Street SW. Intersection Level of Service Impacts Table 4 summarizes intersection level of service under 2012 full badout conditions. As shown, all study intersections would operate at LOS D or better with the project under 2012 full buildout conditions. Figure 6 illustrates project -generated and pass -by traffic volumes, and Figure 7 summarizes p.m. peak hour traffic volumes with the project under 2012 full buildout conditions. Detailed level of service summary worksheets are provided in Appendix B. Transportation Engineering Northwest, LLC PO Box 65254 * Seattle, WA 98155 Office/Fax (206) 361-7 333 * Toll Free (888) 220-7333 Dick's Drive -In Restaurant Traffic Impact Study January 31, 2011 Page 10 141111111111F. (Not to Scale) Dick's Drive -In. Transportadon Figure 5 Engineering Project Tri Distribution Edmonds, WA NorthWest, LLC I P I Traffic Impact Study Transportation Engineering Northwest, LLC PO Box 65254 + Seattle, WA 98155 Office/Fax (206) 361-7333 * Toll Free (888) 220-7333 Dick's Drive-in Restaurant Traffic Impact Study January 31, 2011 Page 11 lgx,::� =�T,,np qW ,p (Not to Scale) Transportadon Figure 6 1 Dick's Dirive-In Engineering P.M. Peak Hour Project Generated Edmonds, WA NorthWest, LLC Trip Assignment.at Study Intersections Traffic Impact Study Transportation Engineering Northwest, LLC PO Box 65254 + Seattle, WA 98155 Office/Fax (206) 361-7333 * Toll Free (888) 220-7333 -A Dick's Drive-in Restaurant Traffic Impact Study January 31, 2011 Page 12 (N 74W �ea�Vblurmes ";'ec' ot to Scale) Transportation Figure 7 Dick's Dirive-in Engineering 2012 P.M. Peak Hour Edmonds, WA NorthWest, LLC Traffic Volume Impacts Tralfic Impact Study Transportation Engineering Northwest, LLC PO Box 65254 * Seattle, WA 98155 Office/Fax (206) 361-7333 + Toll Free (888) 220-7333 Dick's Drive -In Restaurant Traffic Impact Study January 31, 2011 Page 13 Tnhip 4- 2()12 P_M_ Peak Intersection Levels of Service Impacts Signalized Intersection Movement Witho Project With Project LOS Delay LOS Delay #1 — SR 99 / 22 01h St SW Signal D 5� D 54 Unsig6alized Intersection Movement LOS Delay LOS Delay #2- SR 99 South Driveway EB B 14 B 15 1 #3 - SR 99 North Driveway EB C 24 D 26 NB Left B 12 B 13 Note: Analysis based on HCS 2000 resuJts using HCM 2000 control delays and LOS. Site Access, Safety and Circulation Issues Vehicular site access with the project would be provided via two existing driveways onto SR 99 and one existing driveway onto 2206 Street SW. As summarized above, critical entering and exiting turning movements at the project site driveways onto SR 99 are anticipated to operate at LOS D or better under 2012 full buildout conditions with little or no vehicular queuing with the proposed development. P.M. Peak Hour Queuing Analysis This section summarizes a queuing analysis conducted for left -turns on SR 99 between the North Driveway and 220"' Street SW. The distance between the stop bar at 220 h Street SW and the North Driveway was field -measured to be approximately 560 feet. As defined in the 2000 Hi ,ghway Ca 'pado Manual, the "back of queue" is the number of vehicles that are queued depending on arrival patterns and vehicles that do not clear the intersection during any given green phase (overflow). For the southbound left -turn at Intersection #1 — SR 99 / 220th Street SW, the average (50ffi percentile) queue length was estimated to be 175 feet and maximum (95 h percentile) queue length was estimated to be 285 feet during the p.m. peak hour with the project in 2012. For the northbound left -turn at Intersection #3 — SR 99 / North Driveway, the maximum (95'h percentile) queue length was estimated to be 25 feet during the p.m. peak hour with the project in 2012. The resulting separation between "back of queues" at their maximum witb�in the center turn line area is therefore estimated at 250 feet. Per WSDOT Standard Plan M-3.03-02 Left Turn Back to Back, this distance is more than adequate to provide for transition and taper of 150 feet (two 50-foot openings and a 50 foot back-to-back left turn transition area) between these two movements. Given the flexibility of the existing channelization for refuge and storage for the northern driveway that would serve the site and no changes in channelization to the center lane along SR 99 are recommended based on this evaluation. . Transportation Engineering Northwest, LLC PO.Box 65254 4 Seattle, WA 98155 Office/Fax (206) 361-7333 * Toll Free (888) 220-7333 Dick's Drive -In Restaurant Traffic Impact Study January 31, 2011 Page 14 Traffic Impact Fees To mitigate systemwide impacts to planned transportation improvements within the City of Edmonds, the City assesses a traffic impact fee for new development. For the proposed land use (Fast Food Restaurant without Drive Through), a� traffic impact fee of $9.19 per square foot of gross floor area is assessed. As the proposed Dick's Drive -In Restaurant would involve of up to 3,800 square -feet in gross floor area, the traffic impact fee is estimated at up to $34,M based on the current traffic impact fee rates. The actual fee would be calculated at the time of building permit application. Project Mitigation Measures A review was conducted of vehicular trip generation, intersection levels of service, and site access and safety issues of.the proposed Dick's Drive -In development. Based upon this traffic impact study, the following mitigation measures may be required: > Payment of traffic impact fees of up to $34,922. Transportation Engineering Northwest, LLC PO Box 65254 + Seattle, WA 98155 Office/Fax (206) 361-7333 + Toll Free (888) 220-7333 - .6 Appendix A Intersection Level of Service Calculations Queues 1: 220th St SW & SR 99 1/14/2011 --* --,, i- 4-- 4\ 4 'T S B R Lane Group Flow (vph) 120 402 220 744 140 1371 249 170 1014 97 v/c Ratio 0.82 0.64 0.94 0.95 0.75 0.84 0,31 0.81 0.61 0.12 Control Delay 104.5 59.9 108.8 75.7 89.0 43.0 11.8 92.2 32.7 7.6 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 104.5 59.9 108.8 75.7 89.0 43.0 11.8 92.2 32.7 7.6 Queue Length 50th (ft) 117 187 216 363 135 632 55 1164 388 8 Queue Length 95th (ft) 186 239 #382 #486 206 #835 128 #247 513 47 Internal Link Dist (ft) 837 1499 1312 259 Turn Bay Length (ft) 150 300 35b 250 355 250 Base Capacity (vph) 192 736 235 800 248 1623 809 250 11670 790 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductri 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.63 0.55 0.94 0.93 0.56 0.84 0,31 0.68 0.61,�, 0.12 95th , perce n , tile volu , me exceed s'capacity, queue maybe longer. Queue shown is maximum after two cycles. Dick's Drive in 5:00 prn 1/12/2011 2011 Existing PM Peak Hour Synchro 6 Report Transportation Engineering Northwest Page 1 't 1�-- 4 HCM Signalized Intersection Capacity Analysis 1/14/2011 1: 220th St SW & SIR 99 Lane Configurations 11 T T+ 71 TT 17 '1 TT r ldea-IFIo-W'.:,(VphpI):.,, 1900 ::,::1900;�::1900;::.1900 1900 1900 1900 , 1900 1900 1900 -1900, 1000 Grade -3% 10% 0% 0% T I E" Tota osi time (S) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4[0 Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00 Ffrt 1.00 0.98 1.00 0.96 1.00 i.*00 .0.8.5 1.-00 0'.86 �it Protected 0.95 1.00 b.95 1.00 0.95 1:00 1.00 0.95 1.00 1.00 8atd. Flow (prot) 1796 3516 1681 3224 1770 3539 1583 11770 3539 160 At Permitted 0.95 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00 1.00 8atd. Flow (perm) 1796 3516 1681 3224 1770 3539 1583 17TO 3539 11583 Volume (vph) 110 317 52 202 497 188 129 1261 229 156 933 89 Peak-�burfsic'to-r, PHF 0.92 . 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.02 0.92 Adj. Flow (vph) 120 345 57 220 540 204 140 , 1371 249 170 1014 97 MR Re-duction, (vph) 0 9 0 0 26 - 0 0 0 83 ..0 0 43 Lane 666-p Flow (vph) 120 393 0 220 718 0 140 1371 166 1'70 1014 54 Turn Type o Prot Prot Prot, - Perm Prot Perm Pr . oi�&ed Phases 7 4 3 8 5 2 1 6 Permitted Phases 2 .6 -ree' Actuate G n G s 12.8 27.1 20.9 35.2 15.7 67.3 67.3 17.7 69.3 69.3 I Eff6ctive-Green, g (s) 12.3 26.6 20.9 35.2 15.7 68.8 68.8 17.7 70.8 70.8 Actuated g/C Ratio 0.08 0.18 0.14 0.23 0.10 0.46 '5.5 0.46 0.12 0.47 0.47 Clea-ra-666-Ti 'me (s) 3.5 3.5 4.o 4.0 4.0 5.'5 4-.0 5.5 .5.5 V eh , i . cle Extension (s) 1.0 3.0 3.0 3.0 2.0 4.0 4.0 2.0 4.0 4.0 Lane Grp Cap (vph) 147 624 234 757 185 1623 726 209 1670 74 v/s Ratio Prot cO.07 0.11 0.13 cO.22 0.08 cO.39 cO.10 0.29 . v/s Ratio Perm 0.10 0.0 Vic i�ielo 0.82 0.63 0.94 0.95 0.76 0.84 0.23 0.81 O.M 0-07 Uniform Delay, dl 67.7 . 57.1 63.9 56.5 65.3 35.9 24.6 64.5 29.3 21.7 Oro-gre-s"s�ibn Factor 1 .00 1.00 1.00 1.00 1.6o 1.00 1.00 1.00 1.00. 1.00 Incremental Delay, d2 27.0 2.0 42.4 20.8 14.4 5.6 0.7 210.0 0.7 0.1. Delay (s) 94.7 59.1 106.4 77.3 79.7 41.5 25 .3 84.5 30.0 2.1.7 L'e v6 I * of 8 e--r'v i c e F E' F E E D C. F 0 Approach Delay (s) 67.3 84.0 42.2 .36.6 A p* pir o -a'c h -L'O'S E F D D HCM Average Control Delay 52.4 HCM Level of Service D HCM Vo'Iu` 'me to Capacity ratio 0.86 Ai�tiiate-di Cycle Length (s) 150.0 Sum of lost time (s) 16.0 Intersection Capacity Utiliz ation 82.7% ICU Level of Service E Analysis Period (min) 15 c. Critical Lane Group Dick's Drive in 5:00 pm 1/12/2011 2011 Existing PM Peak Hour Synchro 6 Report Transportation Engineering Northwest Page 2 I - 46 Queues 1/14/2011 1: 220th St SW & SR 99 4\ Ea-de-Gr6-u-p- -EB L EBf --WB-f-NBL ­WB L --fZ-T---R-BR--SBL T, S Lane Group Flow (vph) 121 406 222 753 141 1385 251 172 1024 98 . v/c I Ratio 0.82 0.64 0.94 0'.96 0.76 0.86 0.31 0.82 0.62 0.12 Control Delay 1 . 04.9 60.0 109.4 77.2 89.2 43.8 12.0 92.4 33.0 7.7 .Queue (Delay 0.-0 0.6 0.0 0.0 0.0. 0.0 0 ' 0 0.0 0.0 0.0 Total belay' 104.9 60.0 10 . 9.4 77.2 89.2 43.8 12.0 92.4 33.0 7.7 0 6 e tuel e--n g t ii 60 t h (ft) 1f8 18'9 210 368 136 644 56 166 394 9 Queue L ength 95th (ft) 18 . 8 24 - 1 #386 #495 207. #851 130 #251 519 48 11 nt6mal Link Dist (ft) 837 1499 1312 259 Turn Bay Lehgth,(ft) 150 - 300 350 �50 355 250 Base Capacity (vph) 192 736 235 800 248 1617 807 25b 1665 788 S . t . arvation'Cap Reductn 0 0 0' 0 0 0 0 0 0 0 Spillbac.k Cap Reductn 0 0 0 0 0 0 0 b 0 .0 Storage Cap Reductn 0 0 0 0 0 .0. 0 0 0 R -e d ui-c e d V/6 R -at i o 0.6�' 0.56 0.94 0.94 0.57 0.86 0.31 0.69 0.62:: 0.12 4'. 95ih percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Dick's Drive in 5:00 pm 1/12/2011 2012 Without Project PM Peak Hour S�nchro 6 Report Transportation Engineering Northwest Page 1 HCM Signalized Intersection Capacity Analysis 1: 220th St SW & SIR 99 1/14/2011 Mo"V'e�'ai -8-k Lane Configurations tt if Vi tt if Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Grade (%) -3% 10% 0% 0% Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00 Frt 1.00 0.98 1.00 0.96 1.00 1.00 0.85 1.00 1.00 0.85 Fit Protected 0.95 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00 1.00 Satd. Flow (prot) 1796 3515 1681 3224 1770 3539 1583 1770 3539 1583 Fit Permitted 0.95 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00 1.00 Satd. Flow (perm) 1796 3515 1681 3224 1770 3539 1583 1770 3539 1583 Volume (vph) 111 320 53 204 502 190 130 1274 231 158 942 90 Peak -hour factor, PHIF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph) 121 348 58 222 546 207 141 1385 251 172 1024 98 RTOR Reduction (vph). 0 9 0 0 27 0 0 0 83 0 0 43 Lane Group Flow (vph) 121 397 0 222 726 0 141 1385 168 172 1024 55 Turn Type Prot Prot P rot Perm Prot Perm Protected Phases 7 4 3 8 5 2 1 6 Permitted Phases 2 6 Actuated Green, G (s) 12.9 27.2 21.0 35.3 15.8 67.0 67.0 17.8 69.0 69.0 Effective Green, g (s) 12.4 26J, 21.0 35.3 15.8 68.5 68.5 17.8 70,5 70.5 Actuated g/C Ratio 0.08 0.18 0.14 0.24 0.11 0.46 0.46 0.12 0.47 0.47 Clearance Time (s) 3.5 3.5 4.0 4.0 4.0 5.5 5.5 4.0 5.5 5.5 Vehicle Extension (s) 1.0 3.0 3.0 3.0 2.0 4.0 4.0 2.0 4.0 4.0 Lane Grp Cap (vph) 148 626 235 759 186 1616 723 210 1663 744 v/s Ratio Prot cO.07 0.11 0.13 cO.23 0.08 cO.39 Co. 10 0.29 v1s Ratio Perm 0.11 0.03 v/c Ratio 0.82 0.63 0.94 0.96 0.76 0.86 0.23 0,82 0.62 0.07 Uniform Delay, dl 67.7 57.1 63.9 56.6 65.2 36.4 24,8 164.5 29.6 21.8 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 27.0, 2.1 43.2 22.4 14.5 6.1 6.8 201.4 0.8 0.1 Delay (s) 94.7 59.2 107.1 79.0 79.7 42.5 25.5 84.9 30.4 21.9 Level of Service F E F E E , D C F C C Approach Delay (s) 67.4 85.4 43.0 37.0 Approach LOS, E F D D HCM Average Control Delay 53.2 HCM Level of Service D, HCM Volume to Capacity ratio 0.87 Actuated Cycle Length (s) 150.0 Sum of lost time (s) 16.0 Intersection Capacity Utilization 83.4% ICU Level of Service E Analysis Period (min) 15 c Critical Lane Group Dick's Drive in 5:00 pm 1/1212011 2012 Without Project PM Peak Hour Synchro 6 Report Transportation Engineering Northwest Page 2 Queues 1: 220th St SW & SR 99 1/14/2011 Lane Group Lane Group Flow (vph) 121 406 222 765 141 1396 251 184 1035 98 v/c Rat - io 0.82 0.63 0.94 0.97 0.76 0.88 0.32 0.84 0.62 0.12 Control Delay 104.9 59.6 109.4 78.2 89 .2 45.8 12.2 94.0 331.4 7.9 belay 0.0 - -0. . 0 - 0.0 0.0 , 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 104.9 59.6 109.4 78.2. 89.2 45.8 12.2 94.0 33.4 7.9 Otue-ue Length 66th (ft-) 118 -"18'9 219 376 136 665 68 177 401 9 Queue Length 9�th (ft) 188 241 #386 #507 207 #862 131 #284 5�6 49 internal Link Dist'(ft) 837 1499 1312 259 Turn Bay Leingfl�(ft) 150 360 350 250 355 25b Base Capacity (vph) 1.92. 736 235 800 248 1592 796 250 1658 .784 starvation Cap Reductn 0 0 0 0 0 01 0 0 0 0 $pillback Cap Reductn 0- 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 keduced-vi6'Ratio 0.63 0.55 0.94 0.96 0.57 0.88 0.32 0.74 0.62 0.13 # 95th percentile volume exceeds capacity, queue may be longer Queue shown is maximum after two cycles. Dick's Drive in 5:00 pm 1/12/20112012 With Project PM Peak Hour Synchro 6 Report Transportation Engineering Northwest Page 1 HCM Signalized Intersection Capacity Analysis . 1: 220th, St SW & SIR 99 1 /14/2011 M-dy-ement --Ei�L-EBT-EBR-WEFL-\�VB-T'--\AFBR--t4-E�-L-NgT--NB-R 'BL :SBT SBR Lane Configurations 1900 1900 1900 1900 1900 1000 1900 1000, 1000 1900 :1 goo. 1:900 .,[.Oeal...Flow.�(.vphpi).:..,::, Grade -3% 10% 0% 0% ,Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.01 Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00 1.00 . 0.98 1.00 6.96 1.00 1-.00 6.85 1.00 1.00 0.86 Fit Pro . tected 0 .95 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00 1.00 Satd. Flow (prot) 1796 3515 1681 3221 . 1770 3539 1583 1770 3539 16 3 Fit Permi fted 0.95 1.00 b.95 1.00 0.9� 1.60 1.00 0.95 1.00 1.010. Satd. Flow (perm) 1796 3515 1681 3221 ..1770 3539 1583 1770 3539 1 ' 583 Volume (vph) 111 320 53 204 506 198 130 1284 231, 169- 952 Pe - ak-hour factor, PHF 0.92 0.92 0.92 10.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92, Adj. Flow (vph) 121 348 58 222 550 215 141 1396 251 1�4 1.935 98 'RTOF�ked_Uction (vph). 0 - 9 0 0 27 0. 0 84, 0 0 43 Lane . G . roup Flow (vph) 121 367 0 222 738 0 141 1396 167 184 1035­ 55 T-6.rn.Type Prot Prot Prot Perm Prot Perm. Protected Phases 7 4 3 8 5 2 1 6 ermitted Phases I Act uat ed . Gree . n, G (s) 12.9 27.5 21.0 35.6 15.8 65.9 65.9 18.6 68.7 68.7 Effective"Greeh, g (s) 12.4 .27.0 21.0 35.16 15.8 67.4 67.4 18.6 70.2 70.2 Actuated g/C Ratio 0.08 0.18 0.14 0.24 0.11 0.45 0.45 0.12 0.47 0.47 -5.5 - ance Clear " - time (s) 3.5 -T.5 - �.o 4.0 4.0 5.5 6.5 4.0 5.6 Vehicle 'Extension (s) 1.0 3.0 3.0 3.0 2.0 4.0 4.0 2.0 4.6 4.0 Lane Grp Cap (vph) 148 633 235 764 186 1590 711 219 1656 741. vis'Ra iio Prot cO.07 0.11 0.13 cO.23 0.08 cO.39 cO.10 cO.29 . v/s Ratio Perm 0.11 o.o4 V�c' Ratio 0.82 0.63 0.64 0.97 0.76 0.88 0.24 0.84 0.62 d.07 I U . niform Delay, dl 67.7 56.8 63.9 56.6 65.2 37. , 6 25.4 64.2 30.0 &0 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 - 27.0 1.9 43.2 24.1 14.5 7.2 0.8 23.2 0.8 0 Delay (s) 94.7 58.8 107.1 80.7 79.7 44.8 26.2 87.5 30.8 22.1 Level -of Service F E F F E D C F C Approach belay (s) 67.0 86.7 44.9 38.1 Approach LOS E F D D HCM Average Control Delay 54.4 HCM Level of Service D HCM Volume to Capacity ratio 0.91 Actuated (Cy-cle Le' . ngth - (s) 1.50.0 Sumbf lost time (s) 20..0 Intersection Capacity'Utilization 84.7% ICU Level of Service ,Analysis Period (min) .15 c Critical Lane Group Dick's Drive in 5:00 pm 1/12/2011 2012 With Project PM Peak, Hour Synchro 6 Report Transportation Engineering Northwest Page 2 . C; HCS2000: Unsignalized Intersections Release 4.1f TWO-WAY_`STOP CONTROL SUMMARY Analyst: JGT Agency/Co.: TENW Date Performed: 01/12/2011 Analysis Time Period: PM Peak Intersection: #2-South Driveway & SR 99 Jurisdiction: WSDOT/City of Edmonds Units: U. S. Customary Analysis Year: 2011 Existing Project ID: Dick's Drive In East/West Street: South.Driveway North/South Street: SR 99 Intersection Orientation: NS Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Northbound Southbound Movement 1 2 - 3 1 4 5 6 L T R L T R Volume 1559 1148 9 Peak -Hour Factor, PHF 0.92 0.92 0.92 Hourly Flow Rate, HFR 1694 1247 9 Percent Heavy Vehicles Median Type/Stora.ge Undivided RT Channelized? Lanes 2 2 0 Configuration T T TR Upstream Signal? Yes No Minor*Street: Approach Westbound Eastbound Movement 7 8 .9 10 11 L T R 'L T R Volume 30 Peak Hour Factor, PHF 0.92 Hourly Flow Rate, HFR 32 Percent Heavy Vehicles 2 Percent.Grade (%) 0 0 Flared Approach: Exists?/Storage Lanes. 1 Configuration R Delay, Queue Length, and Level of Service Approach NB S8 Westbound Eastbound Movement 1 4 1 7 8 9 1 10 11 12 Lane Cc'nfig I I . R v (vph) C (m) (vph) v/C 95%.queue length Control Delay LOS Approach Delay Approach LOS 14.1 B J2 426 0.08 0.24 14.1 B HCS2000: Unsignalized Intersections Release 4.1f TW6-WAY STOP CONTROL SUMMARY Analyst: Agency/Co.: TENW Date Performed: 01/12/2011 Analysis Time Period: PM Peak Intersection: #2-South Driveway & SR 99 Jurisdiction: WSDOT/City of Edmonds Units: U. S. Customary Analysis -Year: 2012 Without Project Project ID: Dick's Drive In East/West Street: South Driveway North/South Street: SR 99 Intersection Orientation: NS Study period (hrs): 0.25 Vehicle Volumes and Adjustments -- Major Street: Approach Northbound Southbound Movement 1 2 3 1 4 5 6 L T R L T R Volume 1575 1159 9 Peak -Hour Factorr PHF 0.92 0.92 0.92 Hourly Flow Rate, HFR 1711 1259 9 Percent Heavy Vehicles Median Type/Storage Undivided RT Channelized? Lanes 2 2 0 Co nfiguration T T TR , upstream Signal? Yes No Minor Street: Approach Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R Volume 30 Peak Hour Factor, PHF 0.92 Hourly Flow Rate, HFR 32 Percent Heavy Vehicles 2 Percent Grade M 0 0 Flared Approach: Exists?/Storage Lanes I Configuration R Delay, Queue Length, and Level of Service Approach NB SB Westbound Eastbound Movement 1 4 1 7 8 9 10 11 12 Lane Config R v (vph) 32 C(m) (vph) 422 v/C 0.08 95% queue length 0.24 Control Delay 14.2 LOS B Approach Delay 14.2 Approach LOS B . 4.4 IL HCS2000: Unsignalized Intersections Release 4.1f TWO-WAY STOP CONTROL SUMMARY Analyst: JGT Agency/Co.: TENW Date Performed: 01/12/2011 Analysis Time Period: PM Peak Intersection: 02-South Driveway & SR 99 Jurisdiction: WSDOT/City of Edmonds Units: U. S. Customary Analysis Year: 2012 With Project Project ID: Dick's Drive In East/West Street: South Driveway North/South Street: SR 99 Intersection Orientation: NS Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Northbound Southbound Movement 1 2 3 4 5 6 L T R L T R Volume 1593 1171 12 Peak -Hour Factor, PHF 0.92 0.92 0.92 Hourly Flow Rate, HFR 1731 1272 13 Percent Heavy Vehicles Median Type/Storage Undivided RT Channelized? Lanes 2 2 0 Configuration T T TR Upstream Signal? Yes No Minor Street: Approach WestbOund Eastbound Movement 7 8 9 10 11 12 L T R L T R Volume 41 Peak Hour Factor, PHF 0.92 Hourly Flow Rate, HFR 44 Percent Heavy Vehicles 2 Percent Grade M 0 0 Flared Approach: *Exists?/Storage Lanes 1 Configuration R Delay, Queue Length, and Level of Service Approach NB SB Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Config R v (vph) C (m) (vph) v/c 95% queue length Control Delay LOS Approach Delay Approach LOS 14.6 B 44 417 0.11 0.35 14.6 B HCS2000: Unsignalized -Intersections Release 4-lf TWO-WAY STOP CONTROL SUMMARY Analyst: Agency/Co.: TENW Date Performed: 01/12/2011 Analysis Time Period: PM Peak Hour Intersection: #3 - North Driveway & SR 99 Jurisdiction: WSDOT/City of Edmonds Units: U. S. Customary Analysis Year: 2011 Existing Project ID: Dick's Drive In East/West Street: North Driveway North/South Street: SR 99 Intersection Orientation: NS Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Northbound Southbound Movement 2 3 1 4 5 6 L T R L T R Volume 16 1543 1147 59 Peak -Hour Factor, PHF 0.92 0.92 0.92 0.92 Hourly Flow Rate, HFR 17 1677 1246 64 Percent Heavy Vehicles 2 Median Type/Storage TWLTL 1 RT Channelized? No Lanes 1 2 2 1 Configuration L T T R Upstream Signal? Yes No Minor Street: Approach Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R Volume 22 10 Peak Hour Factor, PHF 0.92 0.92 Hourly Flow Rate, HFR 23 10 Percent Heavy Vehicles 2 2 Percent Grade M 0 0 Flared Approach: Exists?/Storage Lanes 1 1 Configuration L R Delay, Queue Length, and Level of Service Approach NB SB Westbound Eastbound Movement 1 4 1 7 8 9 10 11 12 Lane Config L L R v'(vph) 17 23 10 C(m) (vph) 524 175 429 v/C 0.03 0.13 0.02 95% queue length 0.10 0.44 0..07 Control Delay 12.1 28.7 13.6 LOS B D B Approach Delay 24.1 Approach LOS C " I � A- HCS2000: Unsignalized Intersections Release 4.1f TWO-WAY STOP CONTROL SUMMARY Analyst: Agency/Co.: TENW Date Performed: 01/12/2011 Analysis Time Period: PM Peak Hour Intersection: f3 - North Driveway & SR 99 Jurisdiction: WSDOT/City of Edmonds Units: U. S. Customary Analysis Year: 2012 without Project Project ID.- Dick's Drive In East/West Street: North Driveway North/South Street: SR 99 Intersection Orientation: NS Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Northbound Southbound Movement 1 2. 3 4 5 6 L T R L T R Volume 16 1558 .1158 60 Peak -Hour Factor,-PHF 0.92 0.92 0.92 0.92 Hourly Flow Rate, HFR 17 1693 1258 65 Percent Heavy Vehicles 2 Median Type/Storage TWLTL RT Channelized? No Lanes 1 2 2 1 Configuration L T T R Upstream Signal? Yes No Minor Street: Approach Westbound Eastbound Movement 7 8 9 10 11 12 �L T R L T R Volume 22 10 Peak Hour Factor, PHF 0.92 0.92 Hourly Flow Rate, HFR 23 10 Percent Heavy Vehicles 2 2 Percent Grade M 0 0 Flared Approach: Exists?/Storage Lanes 1 1 Configuration L R Delay, Queue Length, and Level of Service Approach NB SB Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Config L L R v (vph) 17 23 10 C(m) (vph) 518 173 425 v/c 0.03 0.13 0.02 95% queue length 0.10 0.45 0.07 Control Delay 12.2 29.0 13.7 LOS B D B Approach Delay 24.3 Approach LOS C a N 11 HCS2000: Unsignalized Intersections Release 4.1f TWO-WAY STOP CONTROL SUMMARY Analyst: JGT Agency/Co.: TENW Date Performed: 01/12/2011 Analysis Time Period: PM Peak Hour Intersection: #3 - North Driveway & SR 99 Jurisdiction: WSDOT/City of Edmonds Units: U. S. Customary Analysis Year: 2012 With Project Project ID: Dick's Drive In East/West Street. North Driveway North/South Street: SR 99 Intersection Orientation: NS Study period (hrs): Vehicle Volumes and Adjustments Major Street: Approach Northbound Southbound Movement 1 2 3 4 5 6 L T R L T R 0.25 Volume 39 1554 1158 70 Peak -Hour Factorr PHF 0-.92 0.92 0.92 0.92 Hourly Flow Rate, HFR 42 1689 1258 76 Percent Heavy Vehicles 2 Median Type/Storage TWLTL RT Channelized? No Lanes 1 2 2 1 Configuration L T T R Upstream Signal? Yes No Minor Street: Approach Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R Volume 37 24 Peak Hour Factor, PHF 0.92 0.92 Hourly Flow Rate, HFR 40 26 Percent Heavy Vehicles 2 2 Percent Grade M 0 0 Flared Approach: Exists?/Storage Lanes Configuration L R Approach Movement Lane Config v (vph) C (m) (vph) v/C 95% queue length Control Delay LOS Approach Delay Approach LOS Delay, Queue Length, and Level of Service NB SB Westbound Eastbound 1 4 1 7 8 9 10 11 12 L L R 42 40 26 513 167 425 0.08 0.24 0.06 0.27 0.89 0.19 12.6 33.2 14.0 B D B 25.7 D � W) Ij Appendix B 2012 Traffic Volume Estimates Dick's Drive -In PM Peak Hour Turning Movement Volume Forecasts �.�-t"ate = 1.0% JCRY sesl%Grwthftt. Existing Year = 2011 1 Future Year = 2012 '1161 Enter Emt Total Enter Exit Total 40 39 79 10 10 20 2011 Existing 2012 Baseline Project Distribution Project Trips Passby Trips 2012 With Project SIR 991220th St SIN: SR 991220th St sw SR 991226t" St SW SR 99 1220th St SIN SR 99 1 220th St SW aft 991220th St SIN 715 11111 11111 4.163 491 479 52 202 702 122 ill lgo 8:: 20 4,205 502 484 53 7 100%% 20%130% 110% 30% 4 2 0 2 0 11 0 0 0 726 198 908 ffll 4,24.1 506 484 53 204 721 —Te I -:In�ase 10% at A Pro;aa Share 1.0% 2 1 SR 991 So Uth Driveway 2 SR 99 1 SoUth Driveway 2 SR 99 1 8—th Driveway 2 SR99/$6MhDrlveway 2 SR 99 1 South Driveway SR 99 1 7F T 0 9 _�O 30 30 2.746 0 -F---T- 9 0 0 0 _O 2.773 0 30 30 0 D 5% 0% 25% 25% 105% 0% 2 0 10 0 0 0 12 �OE 2..11 41 41 0 % Inmass 1 0% Project Share= 1.5% all 9i) Norm 6rl Leway ... ....... 3 SR9 9 I,NorlK Driveway, ......... 3 SR 99 1 North Driveway SR99LNorth Driveway 3 99'1 North Drl' SR veway .... .... 3 .. we, 75 0 32 0 10 ri Lq 76 22 0 0 0 2,825 32 10 0 0 I I 66% 25% 0% 125% 55% % 0% 2. ffo 0 21 0 12 7 2 7 7 0 12 37 0 0 0 2.881 0 60 24 Lq % Increase l.D% I Project Share 1.7% Transportation Engineering Northwest, LLC Date Printed: 1114/2011 Page 1 of 1 Appendix C Trip Generation Calculations Trip Gen Land Use PM Peak Daily New Code Size x Enter Exit Trips Trips Method Fast -Food Restaurant with Drive -Through Window .934 3.8 1,000sf =0.52*J3 I =J3-H3 I =C3*33.84 =MROUND(C3*496.12,50) average 20% Reduction of Restaurant Land Use for Pass -by Trips - =-SUM(13:13)*$L$4 I =-SUM(J3.,J3) *$L$4 =-SUM(K3:K3)*$L$4 0.2 Net Trip Generation —.=-SUM(H3:H3)*$L$4 =SUM(H3:H4) — =SUM(I :14) I=SUM(J3:J4) =SUM(K3:K4) Page 1 Transportation Engineering NorthWest, LLC Mernora urn Aj'ri, DATE: April 1, 2011 TO: Bertrand Hauss, P.E.. 0:— City of Edmonds Traffic Engineer 4", k3313 &5"� 42 0 C , � % tA.-- ,k, I k4. % is I FROM: Michael J. Read, P.E. Transportation Engineering Northwest, LLC k'%NAL RE: Dick's Drive -In Restaurant — Traffic Impact An alysis Supple RES 2 / 28 IT This memorandum supplements the Dick's Drive -In Restaurant Traffic, Im act Analysis, P January 31, 2001, TENW in response to City comments prepared on March 18, 2011, for Application #blc[20110095. The response addresses each of the City co'niments as follows: Response to Comment 1 — Count Analysis at Site Driveway onto 120'h! Street: As we. discussed during our telephone conversation, the existing Top Food's site -driveway onto 220'h Street SW was not an identified as a study intersection. during traffic 'study scoping, an I d given its limited use by patrons for the proposed Dick's Drive -In Restaurant on the north end of the site, was not counted during our traffic observations in 2011 As such, the City concurred that no level of service impact analysis would be required at this' location. For trip tracking purposes, an estimated 20 p.m. peak hour project trips would utffi;z:,e this driveway, and therefore, would not result in any significant adverse traffic impacts. Response to Comment 2 — Collision History at Northern Driveway: XENW reviewed historical collision records maintained by the City of Edmonds Police Department between 220 h Street SW and 212" Street SW along SR 99. This statistics were reviewed during a three year period from January 1, 2008 through December 31, 2010, and were comprehensive in nature, including identifying collisions that occurred within private parking lots along SR 99. Attachment A summarizes collisions that occurred at key intersections along SR 99, including 212'h Street SW, 216' Street SW, and 220 h Street' S\V. Collisions occurring within 100 feet of these intersections were considered to occur at'thc intersection. Also, noted and separated out were those collisions that are; considered ."mid -block" in the vicinity of the northern driveway along SR 99. As shown in Attachment A � 6 collisions were reported at 212th Street, 11 collisions at 216'h Street SW, and 44 collisions at 220'h Street SW during the three year period. No fatalities were reported within the. roadway segment studied. Mid -block collisions were reported from distances north of * 220" Strect'SW'and 216" Street SW. For collisions reported as being south of 216 h Street SW. identified %rithin the three year period, both of which were more than ;t Per r proposed northern driveway vicinity (i.e., more than 200 feet away), and th6refc ? considered to be related. For collisions reported as being north of 220" S were reported, of which, only one occurred within immediate the vicinity of the driveway (approximately 600 feet north of 220thStreet SV/) and did not'res. www.tenw.com PO Box 65254 # Seattle, WA 98155 Office/Fax (206) 361-7333 + Toll Free (888j 220-7333 STREET N1B RESU A -72011 PR FL E %WILDING DEPARTMENT 01TY OF 60MONDS Dick's Drive -In Restaurant — Traffic Impact Analysis Supplement April 1, 2011 Page 2 within the three year period. It should be noted that in addition to this'colhsion, one incident was reported to occur within the private driveway/parking lot are�alof the northern driveway vicinity and also did not result in any injuries. As such, based on. our review of historical collision records within the past 3 years, no collision statisticswer'� reported that identified any safety issues or conflicts that occur within the vicinity of the existing Top Food's northern driveway on SR 99 that would be utilized by the prop6sedDick's Drive -In Restaurant. Response to Comment 3 — Trip Distribution: A revised Figure 5 is incl6ded as Attachment B to this response. The 5 percent noted on the west leg of the:220th Street SW, and SR 99 intersection is an assumed directional split of traffic traveling w�c$tbound on 22 . Oth Street SW that would continue west on 220th Street SW and* enter the site at the Top Food's driveway on 220th Street SW rather than making a westboun'd right turning' 'movement onto SR 99 and then a northbound left turning movement from SR 99 into the 'Top Food's site at the northern driveway along SR 99. Response to Comment 4 — WSDOT Reference: Comment noted, this -was a typo in our reference to a standard plan within the WSDOT Design Ma'nual. Response to Comment 5 — Grand Opening Traffic Control: During the entitlement phase, neither the applicant nor TENW was focused on addressing the initi;lal "spike" that sometimes occurs when opening certain retail establishments. While the applicant is cognoscente of this potential, no specific traffic control pla n's are developed to address "grand opening" traffic levels, as the owner is not expecting traffic loads that would generate adverse operating conditions. It should be noted however, that at all existing Dick's Drive -In Restaurant: stores, active security is providing during peak demand periods that occur in late eveiiin 'hours on weekends or special events. Security has always been at top priority of Dick's Drive -In Restaurants and is provided by off -duty police officers from the local ju . risdiction. Dick's. Drive -In Restaurants will utilize the same practice at the proposed Edmond's location, and - would also have police presence during the grand opening events. These resources would therefore be immediately available to provide active traffic Control if a derl�a:nd arises. Based on TENW's review of the finalized site plan, an additional recom;men:dation to address any potential spikes in traffic levels associated with grand openi.ng,of the restaurant would include temporary restriction of vehicular access interior to the parking lot and close proximity of the northern driveway to avoid any vehicle queuing or conflicts that could occur adjacent to the proposed restaurant pad. Attachment C contains anmexhibit of this temporary restriction (involving placement of traffic cones and temporary'signage) which could be managed by on -site off -duty police officers, owners, or store rnana m ge ent during, the grand opening event. Transportation Engineering Northwest, LLC PO Box 65254 + Seattle; WA 98155 Office/Fax (206) 361-7333 # Toll Free (888) 220-7333 ATTACHMENT A COLLISION HISTORY 1/1/2.008 TO 12/31/2010 Transportation Engineering Northwest, LLC PO Box 65254 * Seattle, WA 98155 Office/Fax (206) 361-7333 * Toll Free (888) 220-7333 Collision History along SR 99 between 212th Street SW and 220th Street SW JANUARY 1, 2008 - December 31, 2010 I REF NO I DATE I TIME I OFFENSE I LOCATION STREETI IMPACT PT I STREEI72 I TRAF AREA PRIM MSE JINJIFTLI Highway 29 WW 212th Sbaot SW 09003670 20090925 211011 ACCIDENT -TRAFFIC 21200 HWY 99, EDMONDS WA 98275 212 ST SW AT HWY 99 STREET TOOCLS 0 0 08001728 20080501 163657 ACCIDENT -TRAFFIC 21200 HWY 99, EDMONDS WA 98275 HWY 99 15 FT N 212 ST SW STATEHWY DEFEQP 1 0 09001517 20090425 94324 ACCIDENT -TRAFFIC 21200 HWY 99, EDMONDS WA 98275 212 ST SW 25 FT W HWY 99 STREET INATT,DUNKWN.OTHE 0 0 09004258 20091105 235502 ACCIDENT-TRF H&R ATT 21116 HWY 99, EDMONDS WA HWY 99 160 FT N 212 ST SW STREET YLDPES+INATT+BACK 0 0 08003442 20080819 135402 ACCIDENT -TRAFFIC 21200 HWY 99, EDMONDS WA 98275 HWY 99 20 FT N 212 ST SW STATEHWY YIELD,INATT+NOTDI 0 0 09001699 20090508 111140 ACCIDENT -TRAFFIC 21200 HWY 99, EDMONDS WA 98275 HWY 99 30 FT N 212 ST SW STATEHWY OTHER+DUNKWN 1 0 Three year average collision history at Highway 99 and 212th Street SW 6 total collisions 2 injury collisions 4 property damage only collisions Highway 99 and 216th street SW 09000688 20090307 202602 ACCIDENT -TRAFFIC 21600 HWY 99, EDMONDS WA HWY 99 AT 216 ST SW STATEHWY YIELD-INATT+DUNKW 1 0 10004342 20101114 201620 ACCIDENT -TRAFFIC 21600 HWY 99, EDMONDS WA 98026 HWY 99 AT 216 ST SW STREET DUNKWN-TOOCLS 1 0 08003966 20080923 121948 ACCIDENT -TRAFFIC 21600 HWY 99, EDMONDS WA 98026 216 ST SW AT HWY 99 STREET TOOCLS+INATr+DUNK 0 0 10002099 20100609 115516 ACCIDENT-TRF H&R ATT 21600 HWY 99, EDMONDS WA HWY 99 6 FT S 216 ST SW STATEHWY 0 0 09002226 20090617 102114 ACCiDENT-TRAFFIC 21600 HWY 99, EDMONDS WA 98026 HWY 99 20 FT N 216 ST SW STATEHWY TOOCLS+INATT�DUNK 0 0 09003452 20090910 142925 ACCIDENT -TRAFFIC 21500 HWY 99, EDMONDS WA 98043 HWY 99 30 FT N 216 ST SW STATEHWY INATT+DUIA+INTRCT 1 0 10000962 20100313 202448 ACCIDENT -TRAFFIC 21600 HWY 99, EDMONDS WA 216 ST SW 35 FT W HWY 99 STREET INATT+DUNKWN 0 0 100DO058 26160106 3MTbdl 21M HWY 99, EDMONDS WA98M HWY 99 to FrT S 216. ST SW STATEHWY' DtRA' a- 0 08002232 20080605 153559 ACCIDENT -TRAFFIC 21600 HWY 99, EDMONDS WA 98026 HWY 99 100 FT N 216 ST SW STATEHWY TOOCLS+INATT+DUNK 2 0 08004126 20081004 132210 ACCIDENT -TRAFFIC 21558 HWY 99, EDMONDS WA HWY 99 100 FT N 216 ST SW STATEHWY TOOCLS+DOUTSD 0 0 10001350 20100414 150151 ACCIDENT -TRAFFIC 21558 HWY 99, EDMONDS WA HWY 99 100 FT N 216 ST SW STATEHWY INATT+INTRCT+TOOC 0 0 Three year average collision history at Highway 99 and 216th Street SW 11 total collisions 4 injury collisions 7 property damage only collisions Mid -Block Collisions South of 216th Street SW on Highway 99 10001449 20100422 81609 ACCIDENT -TRAFFIC 21700 HWY 99, EDMONDS WA 98026 HWY 99 400 FT S 216 ST SW STATEHWY INATT�YIELD+DOUTS 1 0 09000885 20090307 152302 ACCIDENT-TRF H&R ATT 21600 HWY 99, EDMONDS WA 98026 HWY 99 600 FT S 216 ST SW STATEHWY TOOCLSIINATT+DUNK 0 0 Note: As these mid -block collisions occurred more than 200 feet north of the northern driveway access, they were not considered to be in the driveway vicinity Source: Edmonds Police Department, March 2011. Page 1 of 3 Collision History along SR 99 between 212th Street SW and 220th Street SW JANUARY 1, 2008 -December 31, 2010 I REF NO I DATE I TIME I OFFENSE LOCATION I STREET1 I IMPACT -PT I STREET2 ITRAIF_AREA1 PRIM -CAUSE 11INJIFTLI QG -.4 11fth V� ftW 08000101 20080107 215903ACCIDENT-TRAFFIC 22000 HWY 99, EDMONDS WA 08000293 20080122 111201 ACCIDENT -TRAFFIC 22000 HWY 99, EDMONDS WA 98043 08001129 20080318 145142 ACCIDENT -TRAFFIC 22001 HWY 99, EDMONDS WA 08001630 20080424 225044 ACCIDENT -TRAFFIC 22000 HWY 99, EDMONDS WA 98043 08002135 20080529 163752 ACCIDENT -TRAFFIC 22000 HWY 99, EDMONDS WA 98043 00421IS-1 09000540 20090210 94911 ACCIDENT -TRAFFIC 22000 HWY 99, EDMONDS WA 98043 09GO1661 20090506 72706 ACCiDENT-TRAFFIC 22000 HWY 99, EDMONDS WA 98043 09002344 20090624 140355 ACCIDENT -TRAFFIC 22000 HWY 99, EDMONDS WA 98043 09003139 20090820 114548 ACCIDENT -TRAFFIC 22000 HWY 99, EDMONDS WA 98043 09004616 20091204 201631 ACCIDENT -TRAFFIC 22000 HWY 99, EDMONDS WA 98043 10001460 20100422 181422 ACCIDENT -TRAFFIC 22000 HWY 99, EDMONDS WA 98043 10003096 20100819 115130 ACCIDENT-TRF H&R ATT 22000 HWY 99, EDMONDS WA 98043 10003927 20101017 141736 ACCIDENT -TRAFFIC 22000 HWY 99, EDMONDS WA 10004300 20101112 53930 ACCIDENT -TRAFFIC 22000 HWY 99, EDMONDS WA 98043 10000191 20100116 234610 ACCIDENT -TRAFFIC 22000 HWY 99, EDMONDS WA 98043 10000822 20100304 83600 ACCIDENT -TRAFFIC 22000 HWY 99, EDMONDS WA 98043 10003499 20100915 203623 ACCIDENT -TRAFFIC 22000 HWY 99, EDMONDS WA 98043 08004763 20081117 123836 ACCIDENT -TRAFFIC 22000 HWY 99, EDMONDS WA 98043 10001207 20100402 133247 ACCIDENT -TRAFFIC 22000 HWY 99, EDMONDS WA 98043 08001641 20080425 151917 ACCIDENT -TRAFFIC 22000 HWY 99, EDMONDS WA 98043 09000557 20090211 151746 ACCIDENT -TRAFFIC 220 ST SW, EDMONDS WA 09000651 20090218 135831 ACCIDENT -TRAFFIC 22000 HWY 99, EDMONDS WA 98043 08002641 20080630 190150 ACCIDENT -TRAFFIC 22000 HWY 99, EDMONDS WA 98043 10000743 20100226 232508 ACCIDENT -TRAFFIC 21900 HWY 99, EDMONDS WA 98043 10003321 20100903 94656 ACCIDENT -TRAFFIC 21917 HWY 99, EDMONDS WA 98043 0M711 Z*062119 M732 OW 22WHWY99,E0MOWSWA98W 09001959 20090528 75408 ACCIDENT -TRAFFIC 22000 HWY 99, EDMONDS WA 98043 10000675 20100221 182357 ACCIDENT-TRF H&R AT7 22100 HWY 99, EDMONDS WA 98026 10001237 20100404 204032 ACCIDENT -TRAFFIC 22000 HWY 99, EDMONDS WA 98043 08000660 20080216 15252 ACCIDENT-TRF H&R ATT 22000 HWY 99, EDMONDS WA 98043 08003767 20080909 113351 ACCIDENT -TRAFFIC 22000 HWY 99, EDMONDS WA 98043 G8001019 20080311 180959 ACCIDENT-TRF H&R ATT 22000 HWY 99, EDMONDS WA 98043 09GO2114 20090608 182322 ACCIDENT -TRAFFIC 22000 HWY 99, EDMONDS WA 98043 09004056 20091023 140635 ACCIDENT -TRAFFIC 22000 HWY 99, EDMONDS INA 98043 08003217 20080805 123925 ACCIDENT -TRAFFIC 220 ST SW, EDMONDS WA 09002499 20090707 140741 ACCIDENT -TRAFFIC 21900 HWY 99, EDMONDS WA 98043 08000240 20080118 174743 ACCIDENT -TRAFFIC 22130 HWY 99, EDMONDS WA 08001833 20080508 143621 ACCIDENT -TRAFFIC 22000 HWY 99, EDMONDS WA 08004694 20081113 64705 ACCIDENT -TRAFFIC 22000 HWY 99, EDMONDS WA 98043 09003738 20090930 123444 ACCIDENT -TRAFFIC 22000 HWY 99, EDMONDS WA 98043 09000773 20090227 163404 ACCIDENT -TRAFFIC 22000 HWY 99, EDMONDS WA 98043 09002160 20090611 152023 ACCIDENT -TRAFFIC 21900 HWY 99, EDMONDS WA 98043 10004614 20101208 61043 ACCI DENT-TRF H&R ATT 22000 HWY 99, EDMONDS WA 98043 Three year average collision history at Highway 99 and 220th Street SW HWY 99 AT 220STSW STATEHWY YIELD-INATT,NOTDI 1 0 HVVY 99 AT 220 ST SW STREET OTHER+NOTDIS 1 0 HWY 99 AT 220 ST SW STATEHWY TOOCLS+INATT+DUNK 0 0 SR 99 AT 220 ST SW STATEHWY TOOCLS+NOTDIS+LIG 2 0 HWY 99 AT 220 ST SW STATEHWY DUNKWN 0 0 HWY 99 AT 220 ST SW STATEHWY TOOCLS+INATT+DUNK 0 0 HWY 99 AT 220 ST SW STATEHWY TOOCLS+INATT+DUNK 0 0 HWY 99 AT 220 ST SW STATEHWY SPEEDR+INATT+DUNK 0 0 HWY 99 AT 220 ST SW STATEHWY TOOCLS+OTHER-INAT 0 0 HWY 99 AT 220 ST SW STATEHWY NONE+NOTDIS 1 0 HWY 99 AT 220 ST SW STATEHWY NONE+NOTDIS 1 0 HWY 99 AT 220 ST SW STATEHWY YLDPES+INATT 1 0 HWY 99 AT 220 ST SW STATEHWY TOOCLS+INATT+DOUT 0 0 HVVY 99 AT 220 ST SW STATEHWY LIGHT+INATT+DUNKW 3 0 220 ST SW AT HWY 99 STREET NONE+NOTDIS 1 0 220 ST SW AT HWY 99 STREET TOOCLS+INATT+DUNK 0 0 220 ST SW AT HVVY 99 STATEHVV1( LIGHT+INATT 0 0 220 ST SW AT HWY 99 STREET BACKNG-DEFEQP+DUN 0 0 220 DST SW AT HWY 99 STREET TOOCLS+DUNKWN 0 0 220 ST SW AT HWY99 STREET YIELD+INATT+DUNKW 0 0 220 ST SW AT HWY 99 STREET TOOCLS+INATT+DOUT 0 0 220 ST SW AT HWY 99 STREET INATT+BACKNG+DUNK 0 0 HWY 99 12 FT N 220 ST SW STATEHWY TOOCLS+iNATT+DUNK 2 0 HWY99 20 FT N 220 ST SW STATEHWY BACKNG+INATT+DUNK 0 0 HWY 99 20 FT N 220 ST SW STATEHWY IMPTRN 0 0 220 ST SW 2D FT W StfttEt _ WlA+TOOCLS4AXJNKW 1 0 220 ST SW 20 FT W HWY 99 STREET INATT+BACKNG+DUNK 0 0 220 ST SW 25 FT E HWY 99 STREET DUNKWN+BACKNG 0 0 HWY99 30 FT N 220 ST SW STATEHWY OTHER+NOTDIS+AFAT 0 0 220 ST SW 30'EAST OF HWY 99 STREET DUIA+TOOCLS+INATT 2 0 220 ST SW 30 FT W HWY 99 STREET TOOCLS+DOUTSD 0 0 220 ST SW 60 FT E HWY 99 STREET INATT+IMPTRN+DUNK 0 0 220 ST SW 50 FT E HWY 99 STREET TOOCLS+INATT+DUNK 2 0 220 ST SW 50 FT W HWY 99 STREET INATT+NOTDIS 0 0 HWY 99 60 FT N 220 ST SW STATEHWY TOOCLS+INATT+DUNK 0 0 HWY 99 80 FT N 220 ST SW STATEHWY TOOCLS+INATT+DINS 1 0 HWY 99 80 FT N 224 ST SW STATEHWY TOOCLS-DOUTSD 1 0 220 ST SW 70 FT W HV4Y 99 STREET YIELD+U-TURN+DUNK 0 0 220 ST SW -80 FT W HWY 99 -STREET YIELD+IMPTRN+NOTD 1 0 220 ST SW 85 FT W HWY99 STREET TOOCLS+DUNKWN 1 0 220 ST SW 100 FT W HWY 99 STREET YIELD+IMPTRN+DUNK 0 0 HVVY 99 100 FT N 220 ST SIN STATEHWY IMPTRN+INAT-T+DUNK 0 0 HWY 99 100 FT N 220 ST SW STATEHWY INATT+YIELD+DOUTS 0 0 44 total collisions 16 injury collisions 28 property damage only collisions Source: Edmonds Police Department, March 2011. Page 2 of 3 Collision History along SR 99 between 212th Street SW and 220th Street SW JANUARY 1, 2008 - December 31, 2010 REF_NO I DATE I TIME I OFFENSE I LOCATION STREETI I tMPACT­PT I STREET2 ITRAFLAREA1 PRIM —CAUSE I-Iffq Mid -Block Collisions North of 220th Street SW on Highway 99 10004615 20101208 60521 ACCIDENT -TRAFFIC 22000 HWY 99, EDMONDS WA 98043 HWY 99 140 FT N 220 ST SW STATEHWY IMPTRN,INATF-DOUT 0 0 10000310 20100125 182007 ACCIDENT -TRAFFIC 21900 HWY 99, EDMONDS WA 98043 HWY 99 150 FT N 220 ST SW STATEHWY TOOCLS+DUNKWN 0 0 10004620 20101206 143336 ACCIDENT -TRAFFIC 22000 HWY 99, EDMONDS WA 98043 HWY 99 220 FT N 220 ST SW STATEHWY INATT+TOOCLS+DINS 1 0 08002247 20080606 173238 ACCIDENT -TRAFFIC 22000 HWY 99, EDMONDS WA 98043 HWY 99 300 FT N 220 ST SW STATEHWY NONE+NOTDIS 1 0 08005320 20081229 144739 ACCiDENT-TRAFFIC 22000 HWY 99, EDMONDS WA 98043 HWY 99 300 FT N 220 ST SW STATEHWY YIELD+DUNKWN 1 0 10002750 20100725 130403 ACCIDENT -TRAFFIC 22000 HWY 99, EDMONDS WA 98043 HWY 99 600 FT N 220 ST SW STATEHWY NOSTOP+INATT+DUNK 0 0 09000987 20090316 115658 ACCIDENT -TRAFFIC 21700 HWY 99, EDMONDS WA HWY 99 816 FT N 220 ST SW STATEHWY YIELD+INATT+DUNKVV 2 0 09003561 20OW 8 114007 ACCIDENT -TRAFFIC 21420 HWY 99, EDMONDS WA HWY 99 500 FT N 216 ST SW LOT TOOCLS+INATT+DUNK 0 0 Note: Mid -block collisions between 450 and 650 feet north of 220th Street were considered to be in the vicinity of the existing northern driveway access that would serve the proposed Dick's Drive-in Restaurant, and one was recorded within the Parking Lot of Top Foods. As such. of these reported mid -block collisions only I collision within the last 3 years was reported to be in the vicinity of the existing driveway access and one occurred within the Parking Lot area off of Highway Source: Edmonds Police Department, March 2011. Page 3 of 3 ATTACHMENT B MODIFIED TRIP DISTRIBUTION FIGURE Transportation Engineering Northwest, ' LLC PO Box 65254 * Seattle, WA 98155 Office/Fax (206) 361-7333 * Toll Free (888) 220-7333 TAW (Not to Scale) Transportation Figure 5 Dick's Drive-in Engineering Project Trip Distribution': Edmonds, WA NorthWest, LLC (Revised for Supplement); Trafflc Impact Study ATTACHMENT C TEMPORARY TRAFFIC CONTROL PLANWITHIN PARKING LOT AREA IN VICINITY OF NORTHERN DRIVEWAY Transportation Engineering Northwest, LLC PO Box 65254 * Seattle, WA 98155 Office/Fax (206) 361-7333 * Toll Free (888) 220-7333 J.t�l I W', Transportation Engineering NorthWest, LLC 66 F. Install Temporary Signage to Direct Traffic to Interior Parking Lot for Grand Opening Install Temporary Traffic Control Cones to Block Traffic within First 0 Feet of Restaurant /* Temporary Traffle Control For Grand Opening,' D 31e) Dick's Drive-in �dmonds, WA Traffic Impact Study KALLSEN A R C H I T E C T U R E 28 June 11 Marie Harrison REVISION Senior Permit Coordinator City of Edmonds JUN 28 2011 Development Services Department 121 - 5th Avenue North WILDING DEPARTMENT Edmonds WA 98020 CITY OF EDMONDS T 425-771-0220 F 425-771-0221 Dick's Drive -In - Edmonds Curb Ad ustment i Project Address 219 10 - HWY 99 Edmonds WA 98026 Parcel No. 00580700004008 Pre -Application Meeting No. PRE2010-00015, 12 Dec 20 10 We submit three copies of Site Plan page 1 and Landscape Plan page 26 in support of a proposed adjustment to curbs within the eastern parking lot of subject project, described as follows: 1. Omit the two wheel stops closely east of parking stalls # 28 and #29 (Plot Plan 1 / 1). 2. Omit the curbs, and pave through the intervening area at the two narrow curb islands closely east of parking stalls #24 - 27 and #30 - 32 (Plot Plan 1 / 1). The reason for this adjustment is to remove barriers to traffic circulation within the eastern parking lot. Please note that the affected areas do not qualify as "planters", nor are they used in our Type V planter area calculation (Landscape Plan 12/26). Please contact me if you require any clarifications or further documentation of this proposed adjustment. gn Professional) 85 SOUTH WASHINGTON SUITE 301 SEATTLE WA 98104 TEL 206-382-1679 phil@kallsenarchitecture.com PLANNING DATA New Commercial I Multi -Family Projects Name: Dr Date: Site Address-- Plan Check #: BLD - 2-0 t 00`7 S— (T-aK Project Description: Use(s) Proposed: Allowed Use: (Y40 / NO) CUP File Number: To Allow What Uses: Legal Nonconforming Land Use Determination Issued: (YES I Reduced Site Plan Provided: � JE I NO) Zoningife Map Page: 6'0 c) Com Pla I V,�RVUt ip n - Occi ig Comer Lot: (YES /09) (L Flag Lot(!9 N , 0) q1 /�w y OVAJ-, AD6 File Number (date waived): -A (t(AftkotArea: Plans Match ADB Approved: (YES NO) A(W I Shoreline Required: (YES I Critical Areas Determination #: Zo 1 (200 6 IJ Study Required ,kf-Waiver SEPA Determination: Ltooc crr- If Exempt 00 C S7 u lTro, Needed (for sites with 500 cubic yards of gradinZ-g orUith�i-nk4f4je(k4 (g(t Woun r Lak Ballinger. Requires: (1) Fee, (2) Environmental Checklist, and (3) APO List with notarized form)- 1ZdqiJh7ed:S&thqcks Street: Side: Rear: Actua1$qtba&ks Street- Sid R Lot Coverage/FAR Required: 111111"q— Lot Coverage/FAR Provided: Lot Coverage/FAR Calculations: Datum Point: Datum Elevation: — Maximum Height: -75 Actual Height: Subdivision: 5-02 -2 1� Lot Aggregation Required.- P/O caping Landscaping Matches ADB Approved: Landscaping Bid Provided: I NO) & Bond Amount (100% Bid) S Plan Review By: 0� ap/A a-V t-do PLANNING DATA. STREETF:I��] New Commercial / Multi -Family Projects 66�� W erch _-Par*ihg.A Business Name Type/Use Parking Ratio Tenant Area Required Parking 0(-- U-& t " �0-4 -w, I Iq otal Parking Required: Total Parking Pro vided: # Bedrooms per Dwelling Unit Parking Ratio # Units ired �Parklirng a Studio 1_21D.U_ I Bedroom 1.51D.U. 2 Bedrooms �8/0u. 3 + Bedrooms 2.01D.U. Total Parking Required. Total Parking Provided-, Plan Review By- 1 "trim cap Plex Faces .030 Aluminum Ri TRUCTION & MOUNTING DETAIL iurn 2 or 6'on center 3/8"all thread )olted with 2"x 2"L-Iron back if metal studs iurn 2 or 6'on center 3/8"rated ision bolts onto concrete nurn 2 or 6'on center 3/8"lag hru L-Iron to wood structural member nurn 2 or 6'on center 3/8"x 6"toggle bolts Transformer Can A 1/2" Flex to primary power — Discount Switch APR 05 2011 DEVELOPMENT SERVICES COUNTER BERRY NEON, 5 1 G IN S Y S T E M S 7400 Hardeson Rd Everett, WA 98203 (425) 776.8835 Fax (425) 774.8221 newpermits@berryneonsigns.com 19 ,Act Structural Technology Consultants Woman C�vned I Ceftried Small Business ,Providing Prixtinal Solutions (I Wednesday, July 20, 2011 Tracie Skiles BERRY NEON SIGN SYSTEMS 7400 Hardeson Road Everett, WA 98203 Re: Dick's Drive Inn 21910 Hwy 99, Edmond, WA STC Project: 1384-41 Dear Ms. Tracie Skiles, Per your request, STC has evaluated the use of an alternate footing size of 4'4' x 4'-0" x 8�-6" depth. After analyzing the alternate footing design we concluded this footing size is adequate for the 2Y-0" tall sign. Please contact STC if you have any questions. 0 S N9Regards, (Jf w4s M Duane]. Gee E. 46286 -GIST "SIONA L EX�"' 0"I REET FILE 7827 Convoy Court, Suite 406 1 San Diego, California 92111 (858) 278-2400 1 (800) 681-8106 1 FAX (858) 278-2424 1 signengineer@stcsd.com I www.signengineer.com Grease Interceptor Sizing Worksheet Facility Name: Dick's Drive -In Address: 21910 Hwy 99, Edmonds, WA • A Grease Interceptor permit is required ($365.00 fee). Contact the Pretreatment Technician (425-672-5755) if you have any questions and also to get signature approval on this form. • Per Edmonds City Code the minimum sized Grease Interceptor permitted is 500 gallons. Maximum sized unit is 4,000 gallons. NUMBER OF MEALS SERVED AT PEAK HOUR Based on the total number ofseats and average timeper meal. Lounge and bar seating is counted at 20%. WASTE FLOW RATE (Choose one) • With Dishwashing Machine ...................... 6 gallon flow • Without Dishwashing Machine ................ 5 gallon flow • Single Service Kitchen* ............................. . 2 gallon flow • (Food Waste Disposer ....................... add 1 gallon flow) RETENTION TIME S (Choose one) • Commercial Kitchen Dishwasher ............. 2.5 hours • Single Service Kitchen* ............................. 1.5 hours STORAGE FACTORS (Choose one) 0 Full Service Kitchen 0-12 hour operation: .......... I e Full Service Kitchen 12-20 hour operation: ........ 2 Full Service Kitchen 24 hour operation: ............. 3 Single Service Kitchen*: ....................................... 1.5 (Alternate factor for occasional use kitchen ......... A= 300 B= C= i-S D= Minimum Interceptor Size (liquid capacity) A x B x C x D *A single service kitchen refers to a restaurant where disposable dishware is used and dishwashing operations are therefore greatly reduced. ------------- — ----------------------- (For City use only below this line) Remarks: Sizing determined after discussing food characteristics, the grease interceptor and its performance at the highest meal volume Dick's Drive-in. This approved sizing is assuming that the food service will not have a dishwasher. Note: A dishwasher will require a 2000 gal minimum grease interceptor. Sizing discussed with Ken F. of Dick's Drive -In. Size Approved: 1500-2000 gal. Approved by: 1;n�n Date: 1-24-11 V Pretreatment Technician [Rev. Feb. 20041 1`11ECEIVED FEB 14 2011 CITY OF EDMONDS t1q10 _W�k�aj qj �*ttk X\k-IK After Recordin2 Return To: City Clerk City of Edmonds 121 — 5'h Avenue N. Edmonds, WA 98020 Grantors: Grantee: Legal Description: Tax Parcel Nos. Reference No.: (06505/T330786,D0Cj STREET FILE Ll u NO EXCISE TAX REQUIRED OCT 2 4 2011 KIRKE SIEVERS, SnohoNA Cou* TrOaS414f By KIRKE SIEVERS - 201110240649 13 PGS 10/24/2011 4:16�m RAO SNOHOMISH COUNT , ASHINGTON WATERLINE EASEMENT AGREEMENT BRIAR DEVELOPMENT COMPANY LLP a Washington limited liability partnership HAGGEN, INC. a Washington corporation DICK'S DRIVE-INS, LTD., L.P. a Washington limited partnership CITY OF EDMONDS a Municipal corporation LOTS I AND 2, CITY OF EDMONDS SHORT PLAT RECORDED UNDER AUDITOR'S FILE NO. 200307295008 j _sno 4oftt�sk Co 005807-000-040-07; and 005807-000-040-08 N\A WATERLINE EASEMENT AGREEMENT This WATERLINE EASEMENT AGREEMENT (the "Agreement") is made this day of October, 2011, by and between BRIAR DEVELOPMENT COMPANY LLP, a Washington limited liability partnership ("Briar"), HAGGEN, INC., a Washington corporation ("Haggen"), DICK'S DRIVE-INS, LTD., L.P., a Washington limited partnership ("Dick's") (Briar, Haggen, and Dick's collectively referred to as "Grantor"), and the CITY OF EDMONDS, a Municipal corporation ("COE" or "Grantee") (Briar, Haggen, Dick's, and COE may hereinafter be referred to individually as a "party" or collectively as the "parties"). RECITALS A. Briar is the owner of the property situated in Snohomish County, Washington and legally described in Exhibit "All attached hereto and made a part hereof (the "Briar Property"). B. Haggen has a leasehold interest (the "Haggen Lease") in the Briar Property, upon which it operates a TOP Food and Drug store. C. Dick's is the owner of the property situated in Snohomish County, Washington and legally described in Exhibit "B" attached hereto and made a part hereof (the "Dick's Property"). D. In connection with the construction of improvements upon the Dick's Property, COE requires a utility easement across the Briar Property and Dick's Property to install, operate, and maintain an underground waterline for the Dick's Property. E. Briar, Haggen, and Dick's are willing to grant such an easement in accordance with this Agreement. NOW, THEREFORE, in consideration of the mutual covenants contained herein, the parties hereto agree as follows: I . Grant of Easement. Briar, Haggen, and Dick's do hereby grant and convey to COE and its successors and assigns, a permanent non-exclusive easement for: the installation, operation, and maintenance of an underground waterline for the benefit of the Dick's Property over, across, through, and below the Briar Property and Dick's Property, but only to the extent of those portions legally described and diagrammed in Exhibit "C" attached hereto and incorporated herein by this reference (the "Easement Area"), and the further right to remove trees, bushes, undergrowth, and other obstructions interfering with the location, construction, and maintenance of said underground waterline, together with the right of reasonable access to the Easement Area for the stated purposes. Notwithstanding the foregoing or anything in this Agreement or otherwise to the contrary, Grantor shall have the right to use the Easement Area for any use not inconsistent with the purposes of this Agreement. (06505/-r330786.DOC) 2 2. Costs of Construction and Maintenance. COE has already, at COE's cost and expense (pursuant to an earlier agreement with Dick's) installed the underground waterline within the Easement Area (the "Waterline"). If Briar, Haggen, or Dick's gives COE notice of reasonable maintenance that needs to be performed on the Waterline, Easement Area, Briar Property, or Dick's Property as a result of normal wear and tear, failure of, or defects with the Waterline and COE does not perform such maintenance or repair within thirty (30) days from the date of said notice (or sooner as reasonably necessary in the case of an emergency), Briar, Haggen, and/or Dick's will be entitled to perform such maintenance or repair and COE will be liable to such respective party for the costs of such maintenance or repair. 3. Relocation of Waterline. Each Grantor has the right at any time to relocate that portion of the Waterline within the Easement Area upon a minimum of forty-five (45) days'prior written notice, provided that such relocation: a. Will not interfere with or diminish the utility services to Dick's or the Dick's Property; utility; b. Will not reduce or unreasonably impair the usefulness or function of such C. Is performed without cost or expense to the other parties; d. Will be completed using materials and design standards which equal or exceed those originally used; and e. Shall have been approved by the owner of the Dick's Property (such approval not to be unreasonably withheld or delayed) as well as any utility company and the appropriate governmental or quasi-govem-mental agencies having jurisdiction thereover. Documentation of the relocated easement area shall be the relocating party's expense and shall be accomplished as soon as possible. Dick's shall have a right to require an as - built survey of such relocated utility be delivered to it at the expense of the party that relocated or caused the relocation of the Waterline. 4. Compliance with Laws and Rules. The parties shall at all times exercise their rights herein in accordance with all applicable statutes, orders, rules and regulations of any public authority having jurisdiction or claiming jurisdiction over the subject easement or Waterline. 5. Work Standards. All work to be performed on the Briar Property, Dick's Property or Waterline pursuant to this Agreement shall be in a careful and workmanlike manner, free of claims, and liens. Upon completion of any maintenance work on the Waterline, the party causing the work to be performed shall remove (or cause to be removed) all debris and restore the surface of the Easement Area as nearly as possible to the condition in which it was at the commencement of such work. It is specifically acknowledged that the party performing or (06505/-r330786.DOC) 3 causing any such work will not unnecessarily hinder or impact the ingress, egress, or use of the Briar Property, Dick's Property, or the Easement Area, and will provide a minimum of seventy- two (72) hours advance written notice (or notice after the fact in case of an emergency) to Briar, Haggen, and Dick's of access to the Easement Area and/or Waterline. 6. Release and Indemnit . Each party does hereby release, indemnify, and promises to defend and save the others harmless from and against any and all liability, loss, damage, expense, actions, and claim, including costs and reasonable attorneys' fees, incurred by any of the other parties in defense thereof, asserted or arising directly or indirectly on account of or out of acts or omissions of a party and/or the party's employees or agents in the exercise of the rights or the performances of the duties contained herein, including, but not limited to those resulting from any personal injury, death, property damage, water pollution, hazardous waste contamination, hazardous substances contamination, damage to fish or wildlife, or fish or wildlife habitat, damage to natural resources, or, environmental harm, arising out of or in connection with the Waterline and use of or access to the Briar Property, Dick's Property, or Easement Area. 7. Duration. The term of said easement shall be indefinite and shall continue until revoked by the mutual agreement of Briar, Dick's, and COE or their respective heirs, successors, or assigns. Said easement is intended to and shall run with the land and the benefits and burdens of the easement herein created shall pass to the heirs, successors and assigns of the parties in and to their respective properties benefited and burdened by these easements. 8. Specific Performance. If any party shall default in its obligations under this Agreement, the parties each acknowledge that it would be extremely difficult to measure the resulting damages. Accordingly, any nondefaulting party, in addition to any other rights or remedies, shall be entitled to restraint by injunction of a violation, or attempted or threatened violation, or any condition or provision of this Agreement, or to a decree specifically compelling performance of any such condition or provision. In such event, all parties hereto each expressly waive their defense that a remedy in damages or at law would be adequate. 9. Liens. COE shall not allow any mechanics, laborers, materialmen's, or any other lien of any type or nature whatsoever to be placed against the Easement Area, Briar Property, or Dick's Property arising out of any activity thereon by COE or its agents or employees. If any lien is placed against the Briar Property, Dick's Property, or Easement Area as a result of or incident to any such activity, COE shall within ten (10) days of notice from Briar, Haggen, or Dick's to either: (1) cause the same to be released and discharged of record; or (ii) at COE's expense, cause a title insurance company acceptable to the affected party to issue insurance to said party and any lender designated thereby insuring over such lien, whether pursuant to deposit or bond. 10. Invalidation. If any provision of this Agreement is held to be invalid by any court, the invalidity of such provision shall not affect the validity of the remaining provisions. 11. Notices. All notices, demands, statements, and requests (collectively the "notice") required or permitted to be given under this Agreement must be in writing and shall be deemed to (06505rF330786.DOC) 4 have been properly given or served as of the date hereinafter specified: (i) on the date of personal service upon the person to whom the notice is addressed or if such person is not available the date such notice is left at the address of the person to whom it is directed,,(ii) on the date the notice is postmarked by the United States Post Office, provided it is sent prepaid, registered or certified mail, return receipt requested, and (iii) on the date the notice is delivered by a courier service (including Federal Express, Express Mail, Emery or similar operation) to the address of the person to whom it is directed, provided it is sent prepaid, return receipt requested. The address of the signatories to this Agreement is set forth below: Dick's- Dick's Drive -Ins, Ltd., L.P. 4426 — 2nd Avenue N.E. Seattle, WA 98105 Attn:, Jim or Walt Spady With a copy to: Lasher Holzapfel Sperry & Ebberson PLLC 601 Union Street, #2600 Seattle, WA 98101 Attn: Eugene W. Wong Briar: Briar Development Company LLP P.O. Box 29060 Bellingham, WA 98228-1060 -Attn: Gary Hall With a copy to: GordonDerr, LLP 2025 First Avenue, Suite 500 Seattle, WA 98121 Attn: Joel M. Gordon Haggen: Haggen, Inc. 2211 Rimland Drive Bellingham, WA 98226 Attn: C.E.O. & C.F.O. With a copy to: Akerman Senterfitt One SE Third Avenue, #2500 Miami, FL 33131 Attn: Carl D. Roston & Martin G. Burkett COE: City of Edmonds 121 — 5'h Avenue N. Edmonds, WA 98020 Attn: City Clerk 106505/-r330786.DOC) 5 Each party,shall have the right from time to time and at any time, upon at least ten (10) days' prior written notice thereof in accordance with the provisions hereof, to change its respective address and to specify any other address within the United States of America; provided, however, notwithstanding anything herein contained to the contrary, in order for the notice of address change to be effective it must actually be delivered. Refusal to accept delivery of a notice or the inability to deliver a notice because of an address change which was not properly communicated shall not defeat or delay the giving of a notice. 12. Cost and Attorneys' Fees. If any party hereto shall bring any suit, arbitration or other action against another for relief, declaratory or otherwise, arising out of this Agreement, the prevailing party shall have and recover against the other party, in addition to all costs and disbursements, such sum as the Court, or arbiter may determine to be a reasonable attorneys' fees. 13. Non Waiver. The failure of a party to insist upon strict performance of any of the terms, covenants, or conditions hereof shall not be deemed a waiver of any rights or remedies which they may have hereunder or at law or equity and shall not be deemed a waiver of any subsequent breach or default in any of such terms, covenants, or conditions. 14. Not a Public Dedication. Nothing herein contained shall be deemed to be a gift or dedication of any of the other lot or a portion thereof to the general public, or for any public use or purpose whatsoever. Except as herein specifically provided, no right, privileges or immunities of any party hereto shall inure to the benefit of any third -party person, nor shall any third -party person be deemed to be a beneficiary of any of the provisions contained herein. 15. Binding Effect. The terms of this Agreement and all easements granted hereunder shall constitute covenants running with the land and shall inure to the benefit of and be binding upon the signatories hereto and their respective successors and assigns who become parties hereunder. Haggen shall remain a party until such time as the Haggen Lease is terminated or otherwise expires by its terms or Haggen is otherwise released from its obligations. thereunder. This Agreement is not intended to supersede, modify, amend, or otherwise change the provisions of any prior instrument affecting the land burdened hereby. 16. Singular and Plural. Whenever required by the context of this Agreement, the singular shall include the plural, and vice versa, and the masculine shall include the feminine and neuter genders, and vice versa. 17. Counterparts and Signature Pages. This Agreement may be executed in several counterparts, each of which shall be deemed an original. The signatures to this Agreement may be executed and notarized on separate pages, and when attached to this Agreement shall constitute one complete document. 18. Documents. Each party to this Agreement shall perform any and all acts and execute and deliver any and all documents as may be necessary and proper under the (06505/T330786.DOC) 6 circumstances in order to accomplish the intents and purposes of this Agreement and to carry out its provisions. 19. No Merger. It is the express intent of the parties that the easement granted hereunder shall not merge with the fee interest in the Briar Property or Dick's Property. The terms of this Agreement, to the extent specifically inconsistent with other agreements or respective rights of the parties, shall supersede such inconsistencies. IN WITNESS WHEREOF, the parties have caused this Agreement to be duly signed as of the day and year first above written. BRIAR: BRIAR DEVELOPMENT COMPANY LLP a�,�hington limited lilility partnership 0 -RAC-k%e-?i 42- Rpnoe-A V Its: jj HAGGEN: HAGGEN, INC. a Washington corporation By, f4 Its: DICKS: DICK'S DRIVE-INS, LTD., L.P. a Washington limited nership !=:7 — 1z B #,Py Its. VP OF Oftp 6ep C I-ry C CO/Z( -k, IT-5 [NOTARY BLOCKS ON FOLLOWrNG PAGE] f06505/-r330786.D0Cj 7 STATE OF WASHINGTON ) ss. COUNTY OF I certify that I know or have satisfactory evidence that 4,1;CM0,& g, _ signed this instrument, on oath stated that he/she was authorized to execute ee instrument and acknowledged it in his/her capacity as the P^r-V-A<-C of Briar Development Company LLP to be the free and voluntary act of such partnership for the uses and purposes mentioned in the instrument. Dated this IZ-6 day of October, 2011. �Jjt%jjlll I fill,, 4,11'. $,�T H 4: '0 0130 5r - 19.2 b" WAS'* STATE OF WASHINGTON ) ) ss. COUNTY OF Wv-la�con-% ) C"� zs�� w'qq I (Signature) (Printed Name) s�,Arc Notary Public in and for the State of Washington, residing at My commission expires L4. Ig - m I certify that I know or have satisfactory evidence that , -P<y,-, 5k-Vcn,�, signed this instrument, on oath stated that he/she was authorized to execute the instrument and acknowledged it in his/her capacity as the 0 F n of HAGGEN, INC. to be the free and voluntary act of such company for the uses and purposes mentioned in the instrument. Dated this 12-:J�n day of October, 201 L CaION \C3 % 'TA :4 0 f? :0+ (P (JB .0 ..AZ, 0 1 - 1 N# OF �S� %% 1111"1111111100% 11 (Signature) (Printed Name)* L.h. -S-qr1110C�.r5k1 Notary Public in and for the State of Washington, residing at My commission expires (06505rr330786.DOC) 8 STATE OF WASHINGTON ) ) ss. COUNTY OF KI A/ I certify that I know or have satisfactory evidence that \/ / 114 5 P19 41 signed this instrument, on oath stated that he was authoij*zed to execute the instrument and acknowledged it in his capacity as the Vpor C01tip W ,pf DICK'S DRIVE-INS., LTD., L.P. to be the free and voluntary act of such limited partnership for the uses and purposes mentioned in the instrument. U Dated this 1 -1 day of October, 2011. Notary Publit State of Washington JEAN MILLER My:'Appo!ntment Expires Mar 1.�2.0.14 STATE OF WASHINGTON ) COUNTY OFSW�j ss. 0�1 /oil rblvm.. . �� (Sigfaqre),�-­ (PriWName) (,-km md(ez Notary Public in and for the S4te of Washington, residing, at �0' / My commission expires 3-) -'?-01 L4 _73H ent at(d acknowledged it I certify that I know or have satisfactory evidence that (�49AWZ-Iigned this instrument, on oath stated that he was authorized to execute e in itrum in his capacity as the ::2?2,g of the CITY OF EDMONDS to be the free and voluntary act of such municip'alit�/for the uses and purposes mentioned in the instrument. Z-4- Dated this day of October, 2011. %4 Orq (Bignature) ­_ I (Printed Name)< jlj-1�114 1'2�, S&111�11 Notary Public in and for the State of Washington, residing at My commission expires 9 (06505rF330786.DOCI 9 EXHIBIT "A" (Briar Property) LOT 1, CITY OF EDMONDS SHORT PLAT RECORDED UNDER AUDITOR'S FILE NUMBER 200307295008, RECORDS OF SNOHOMISH COUNTY, WASHINGTON, BEING A PORTION OF TRACTS 40, 41 AND 42, SOLNER'S FIVE ACRE TRACTS, ACCORDING TO THE PLAT THEREOF, RECORDED IN VOLUME 7 OF PLATS, PAGE 25, RECORDS OF SNOHOMISH COUNTY, WASHINGTON, LOTS 4 THROUGH 9, BLOCK I AND LOTS 6 THROUGH 11, BLOCK 2, PINE -LAND ADDITION, ACCORDING TO THE PLAT THEREOF, RECORDED IN.VOLUME 13 OF PLATS, PAGES 50 AND 51, RECORDS OF SAID COUNTY, LOTS 6 THROUGH 11, WILLERS ADDITION, ACCORDING TO THE PLAT THEREOF, RECORDED IN VOLUME 14 OF PLATS, PAGE 13, RECORDS OF SAID COUNTY, AND PORTIONS OF VACATED 219TH STREET S.W. AND VACATED 218TH STREET S.W. SITUATE IN THE COUNTY OF SNOHOMISH, STATE OF WASHINGTON. [END OF EXHIBIT "A"] 106505/T330786.DOCI 10 EXHIBIT "B" (Dick's Property) LOT 2, CITY OF EDMONDS SHORT PLAT RECORDED UNDER AUDITOR'S FILE NUMBER 200307295008, RECORDS OF SNOHOMISH COUNTY, WASHINGTON, BEING A PORTION OF TRACTS 40, 41 AND 42, SOLNER'S FIVE ACRE TRACTS, ACCORDING TO THE PLAT THEREOF, RECORDED IN VOLUME 7 OF PLATS, PAGE 25, RECORDS OF SNOHOMISH COUNTY, WASHINGTON, LOTS 4 THROUGH 9, BLOCK I AND LOTS 6 THROUGH 11, BLOCK 2, PINE -LAND ADDITION, ACCORDING TO THE PLAT THEREOF, RECORDED IN VOLUME 13 OF PLATS, PAGES 50 AND 51, RECORDS OF SAD) COUNTY, LOTS 6 THROUGH 11, WILLER'S ADDITION, ACCORDING TO THE PLAT THEREOF, RECORDED IN VOLUME 14 OF PLATS, PAGE 13, RECORDS OF SAID COUNTY, AND PoRnoNs OF VACATED 219TH STREET S.W. AND VACATED 218TH STREET S.W. SITUATE IN THE COUNTY OF SNOHOMISK STATE OF WASHINGTON. [END OF EXHIBIT "B"I �06505/T330786. DOC I I I EXHIBIT "C" (Easement Area) TMT POR77ON OF LOT 7, CITY OF EDMONDS SHORT PLAF RECORDED UNDER AUDfTOR'S ;7LE NUAl&-R 200307295008. RECORDS OF SNOHOMISH COUNTY w-SPoNGTON. DESCRiOED, AS FOuOwS. COAMENCINO AT THE SOUTHEAST CORNER Or LOT Z sAiD 5HORT PL4T.- tHrAce AtoNc rHE SoLIMERLY LINE OF -WD LOT 2 THE FOLLOWNC COURSES AND DISTAWCES. N42*34'OJ"# 12.14 FEET, THENCE' NJ4r27'51'# 38.33 M7 TO A CURW TO THE L&7 HAWNG A RADIUS OF 7750 FEET AND AN ARC LENGTH OF 8.49 FEET TO A POINT Or r&XDVCY, THENCE N64*16'jf-# 121,Z4 FLrr TO THE POW OF &EGINNING fOR A WATERLINE EASEMENT GRANTED TO THE CfrY OF EUMONn 580MOVISH COUNTY; WASWAICTON LOC-47ED ON AFORESAID LOT 1; THENCE S25*10'00'W 84.77 FEET; THENCE N64*50'00V FO.00 FTJ7.- THENCE N25*?0'00*E 84.87 FEET; THENCE S64*50'00T 10.00 F-V*ET TO THE POINT OF BEGINNING CONTAINING 848:t 5041ARE F= THAT PORnON OF LOT 2. CITY OF EDMONDS SHOW PLAT RECORDED UNDEP AUDITOR'S FILE NUAIRER 200JO72950013. RECORPS OF SNONOMISH COUNTY, WASHINGTON. DESCRIBED AS FOLLOAS- COMME&MG AT THE 50UTNr-45r CORNER OF SAID LOT 2, THENCE ALONG TUE SOUNERLY LINE OF SAID LOT 2 THE roLLowwo COURSES AND DISTANCLES: N42'34'OJ'W 72.14 FEET nzy,�� NJir27'5fl# 38.J3 r&C7 TO A CURV?F TO THE LEFT WOW A RADIUS OF )750 FEa AND AN ARC 4ENGIN OF t�49 PUT TO A POiNT OF TANGENCY; IMENCE .A;54'16'Jl'W 121.24 MET 70 THE PO,'NT OF BEGYNN!NG FOR A WATERLWE EASEME14r CRAN7ED ro rHE CITY OF EDMONDS, SNOMOMSH COUNTY, KASHINGTON LOCATED ON AMAESAID LOT 2, N64'50'00'W 10.00 jrFET. THENCE N25*101001E 2q..S8 Ffrr, THENCE 564',SO'DOT 791 j�ffT TO AN rXISM17 BOWING: THENCE ALONG TNE S4/0 BUILDING UNE THE FOLLOW40 COURSES AND DISTANCES; S25'43'29'W Y2.13 I=, THENCE S64'09'58'E 2.21 F-c*E7;- THENCE DEPAR77NG SAID qujLDjtjG Lim S25,10�OOV 17.3;,, pEfT To The PoiNT or t3ojwwa CONTAINING ZM:t SOUARE FECT. [BALANCE OF PAGE LEFT BLANK] f ,06505/T330786.DOC� 12 N2.5-10,00T 84.87' 6- il' ­ ;�� \ E-7 5257-01-00" V 84.77' .6 1*1 'too. 4 L INE TASL L I N47-34'03'N 12,14' L2 N,36-27'517W 38.JJ' -3 N64'50'00'W raoc' L4 564'50'W-E FO,00' \_R- f7.50. L5 N25*101001E 29.38* L=8, d9' L6 S64'50'00'E 7.9 1' ,7 S2 5"4J29'w )2- fJ' L8 564'09'56T 2.21' L9 S25'10'00'W 17-32' TYPICAL PARX;NG 7vmAmar—a',' �Coku ( E COR, SE CORNER. LOT 2) LOT I .5CALE: 1' 40' EXHIRIT PREPARED FOR DICKS ORAIF-INS DRAWN 8): t;RA lfll� MCRONES & ASSOC. N -11 I N—A M An LAND SURVEYORS AIX sw" (4Zv Iku-Mv SHEET 2 OF 2 [END OF EXHIBIT "C"] f ,06505/T330786.DOCI 13 6'- 0'r B E R R Y N E 0 N SIGN SYSTEMS 4 21'- 8 1/8" a d' P'' q INDIVIDUAL OPEN FACE PAN CHANNEL LETTER DISPLAY 2 1/2".063 ALUMINUM SIDEWALLS ANDA 25 ALUMINUM BACKS PAINTED PMS 485C2X RED EXPOSED NEON ILLUMINATION - 30MA I 5MM TECHNOLUX RUBY RED NEON (TWO PENETRATIONS PER TRANSFORMER AS NEEDED) MOUNTED TO PARAPET WALL (FINISHED DIMENSIONS & DETAIL TO BE DETERMINED) f 71 UVOTIMMOURdOMMIM Be a !Now 'U U0 I Y UF EDMONDS BUILDING DEPARTMENI-71 !'ADDRESS— L —E,:, R ru—ri—A..o'VZDDATE- Go'FiCIAL: STREET FLE _.. _�A' APPROWD BY PLA NIMG A, Job Name: DICK'S DRIVE IN Scale: 1/2"= 1'- 0" Designer: MARTY JOHNSON Q Berry Neon Sign Systems, Inc. All Rights Reserved [:] APPROVED AS IS [-] APPROVEDA/ $014GES AS MARKED SiteAddress: EDMONDS WASHINGTON Date: 1 /28/2011 Rev. 2 / 2 / 2011 3 / 17 / 2011 Unauthorized use, reproduction, and or display shall render the infringer CLIENT APPROVAL: LF11 LE. - Sales Rep: JAY STARR Design No. 012811 DICKS File Name: DICK'S.SCV liable for up to $150,000 in Statutory Damages, plus attorneys fees and costs, SIGNATURE NOTE: If this file has been emailed or faxed it may be out of scale. NOTE: This Color Drawing is a simulation of the proposed colors and should be verified with actual materials. for each infringement, under the U. S. Copyright Act [ 17 U. S. C. 412 Ft 5041 DATE APPROVED: APR 12 2011 BUILDING DEPARTMENT Office/ Deliveries: 7400 Hardeson Road, Everett, WA 98203 m (425) 776-883 5 m (800) 488-2430 m Fax: (425) 774-8221 M E-Mail: info@Berryneonsigns.com GrTY OF SBMONDS SIGN TO HAVE HINGED FACES SIGN TO 25'-0" 7--9" 12-- 2" 12-- 5" IF" PALV--I*v VAS SYTA SIGN TO HAVE HINGED FACES DICK S I ;A. 1/4 LBs 100% BEEF --I-- - :�_, �.., r. � ''1 1-.111.1­ 0'- 6" IF F 4, S, o� 6-11" 5'- 11" 2 X-9n 91-in + 2 114" NEON & GLASS STANDS EACH SIDE it 1'- 6" 2'- 0" M Cn M 0 M C7 ±4'- 3" 2'- 10" �__CONCRETE CONCRETE FOOTING FOOTING C Oi= TO BE SURROUNDED BY PLANTER (BY OTHERS) TO BE SURROUNDED BY PLANTER (BY OTHERS) -t:-. M 4 DI (T(ffl0GN)= ±30" OVER 17" COPY;"HAMBURGERS"= 14" COPY;"INSTANIT SERVICE"= ±1 I" OVER 5 1/2" COPY;"DICK'S" (BOTTOM SIGN)= 5 1/2" COPY;"DELUXE"= 16" COPY;1/4 LB. 100% BEEF"= 8" COPY 0 IN a �_A D/F INTERNALLY ILLUMINATED FREE-STANDING SIGN W/ BARE TUBE NEON ARROW ALL BACK-PAINTED.1 77 CLEAR ACRYLIC FACES (COLORS: PMS 1655C ORANGE. PMS 109C YELLOW, PIVIS 483C BROWN, PIVIS 485C RED, BLACK & 404 OR 804 BLUE -WHITE LACRYL)) INTERNAL 800MA H.O. FLUORESCENT ILLUMINATION X C= Z NEON ARROW =ALUMINUM CONSTRUCTION PAINTED PMS 485C RED W1 EXPOSED 30MA CLEAR RED NEON (1 5MM) SIGN FRAMES, CABINETS &ARROW = ALL ALUMINUM CONSTRUCTION 09 0 A CABINETS & POLES PAINTED MATTHEWS #42216 POLYURETHANE ORANGE (EXCEPT "DICK'S DELUXE" CABINET = MATTHEWS POLYURETHANE BLACK RETAINERS) Job Name: DICK'S DRIVE IN Scale: 1/2"= 1 '- 0" Designer: IVIARTYJOHNSON IQ Berry Neon Sign Systems, Inc. All Rights Reserved Unauthorized use, reprod cti,n, and or display sheik render the Infringer tiable for up to $150.000 In Statutory Damage,, pi—st-rey, fee—rd costs, foreach infrinitern-It, under the U.S. Copyright Act (17U.S.C.412 & 5041 C]APPROVEDASIS 0 APPROVED W/ CHANGES AS MARKED Site Address: EDMONDS WASHINGTON Date: Rev 1/28/2011 -2/2/113/17/113/17/11 CLIENT APPROVAL! Sales Rep: JAY STARR Design No. 012811DICKS File Name: DICICS.SCV S16-TuRE B F R R Y NOTE: If this fit, be, be,, ­R,d or taxed it maybe out of scat,. NOTE: This Color Drawingt, a si—tation of the proposed color—rd should be —Ifled Ith,ctu,t starlets. DATE APPROVED: _ 0 W T�� F SIGN SYSTEMS Office IDeliveries: 7400 Hardeson Road, Everett, WA 98203 M (425) 776-883 5 M (800) 488-2430 ID Fax: (425)774-8221 to E-Mail: info@Berryneonsigns.com e =P PN(— WIL W IL wq w4 W4- W4 W9 T!) I X X ILA a) -1 X11 -.11 — wo�> rX 11 1 1 11 C-T. 7� r- T .2- Z -T-1 -1 al-E EAST ELEVATION SCALE: 3/16"= 1'- 0" ELEVATION SHOWING PROPOSED OPEN FACE PAN CHANNEL DISPLAY RECFEIVED APR 0 5 2011 DEVELOPMENT SERVICES COUNTER Job Name: DICK'S DRIVE IN Scale: AS NOTED Designer: MARTY JOHNSON Q Berry Neon Sign Systems, Inc. All Rights Reserved Ej APPROVED AS IS APPROVED W/ CHANGES AS MARKED Site Address: EDMONDS WASHINGTON Date: 3/30/2011 Rev. 3/17/2011 Unauthorized use, reproduction, and or display shalt render the infringer CLIENT APPROVAL: 0. Sates Rep: JAY STARR Design No. 012811 DICKS File Name: DICICS.SCV liable for up to $150,000 in Statutory Damages, plus attorneys fees and costs, SIGNATURE B E R R Y NOTE: If this file has been emai(ed or faxed it maybe out of scale. NOTE: This Color Drawing is a simulation of the proposed colors and should be verified with actual materials. for each infringement, under the U.S. Copyright Act (17 U.S.C. 412 Et 5041 DATE APPROVED: N E 0 N SIGN SYSTEMS Office I Deliveries: 7400 Hardeson Road, Everett, WA 98203 M (425) 776-8835 M (800) 488-2430 m Fax: (425) 774-8221 M E-Mail: info@Berryneonsigns.com .. . ..... ....... . TIV &V xll)� ................... ......... .... ... .. ..... ..... ............ ....... ............ ----------­- - . ...... -*A,-0,PRlY6WAY . ...... ............... .......... is O.Rly's ... . . .... .. R=50. 00' N89'10:11V I =2t DIV . . . . . . . ED 04 oz; p4 Z It ( + + + PAP + + 91 *+ , 4 + + + + + C ON Fk,& 470 PC% l5T&4INr. AM" + + 0 Pli ax 1 ST. F&V ism a N "r 14 X A6%_ OW Sw5,JllWr P&6XP-&%- It 4 it. UREq) I*SVI 10 14 co 0 PARKING STALL pRopla-SE til c K, s DRIVE -IN (TYP) POOD, :57\ �le F.:,A C 11_17,1 DL_De_ + 9-� PZWTH� + + + 10 LANDSCAPE� + + 4 RS 3 ,,-WHEEL STOPS vmv,�-ril.tq FMNCe 40 (TYP) J.3 �uL-L P F-FtIm F-7 F-P. (B 38 PfLtop. L�IN, a 7,30 L.F.) �c 34. 91 '49 IA FR.F-F. o", p y 6 o �4 I Sig as, cl) TRAFFIC AR 12 ROW/,f.; A, jo IIA 0 R= 17 50' 'o, L=8.49' 10 RE v CENIFE D I TL11-1-1 APR 0 5 2011 DEVELOPMEN, E#E8'- E 2 IF col rT 1� 16ESIGN CODE- IBC 2009 wl ASCE 7 Provisions units; pounds, feet u.n.o. WIND (wind governs design) ,2.2 Basic Wind Speed: 85 Per ASCE 7-05, Fig. 6.1 Exposure C Design Wind Pressures (psf) Heights; 15 20.45 20 21.65 25 22.61 Area Force Arm Moment 9.8 201 4.9 988 29.1 594 11.7 6955 2.3 48 14.2 675 3.1 63 14.9 944 35.5 768 16.5 12639 4.7 101 18.5 1866 9.3 201 19.5 3923 50.4 1140 22.5 25641 144.1 3116 53630 Footing Design IBC Table 1806.2 Sec. 1806.3.4 Footing Type: square Soil Pressure (100x2): 200 b 6.36 S, S x d/3 S, = 513 A 2.34P / S, x b A = 2.23 d =05A ( 1+[I+(4.36h/A)]'A)) d = 7.69 Formula Per IBC Section 1807.3.2.1 Footing size: 4'-6- x4'-6" x7'-9- Depth Column Design Pipe Steel - s 18" ASTM A53 Grade 8 / > 18" ASTM AP15L Grade 8 Moment at base (#-f t): 53,630 Required S (in 3); 30.6 Z = Moment x 12 / (1*21000) H (ft) M (lb/f t) Z req'd. Size (in) lbs / ft t (in) Z (in 3) V (lb) 0.0 53,630 30.6 10.0 40.5 0.365 36.9 8.0 29,361 18.6 8.0 28.6 0.322 20.8 2952 6TfRUCTUFRAL TEC�4NOLOG;-T- CON6ULTANT6 INC. IL321 CONVOY COURT, SUITE 406, SAN DIEGO, CA c32111 PHONE (858) 215-2400 FAX (555) 210-2424 PROJECT: E)ICK'S DRIVE IN, 21910 HWY V3, EDMONDS, WA SHEET: I OF 2 PROJ. NO.: 1354-41 DESIGNER: VH DATE: 03-31-11 CLIENT: IBERRY NEON SIGN SYSTEMS I I I 11 � 4'-(,' 5Q.4 ELEVATION GENERAL NOTES FOR POLES AND FOOTING: 1. CONCRETE DE51GN AS F'r-=2500 PSI., MIN. SPECIAL INSPECTION NOT REQUIRED. 2. PIPE STEEL :5 18" A5TM A53 GRADE B. 3. ROLLED STEEL ASTM A36. 4. SIGN CA51NETRY SHALL BE FABRICATED IN THE SHOP OF AN APPROVED FABRICATOR. 5. 501L PASSIVE PRE55URE BASED ON 2001315C TABLE 1806.2 CLASS 5 MATERIAL. SPECIAL INSPECTION NOT REQUIRED. (IF SOFT ORSANDY SOIL, COLLAPSING OR UNSTABLE SOIL, ORGANIC MATERIALS OR GROUNDWATER ARE ENCOUNTERED, IMMEDIATELY CONTACT THE ENGINEER OF RECORD FOR ADDITIONAL w FOUNDATION REQUIREMENTS.) (b. SITE 15 NOT SUBJECTED TO WINE) SPEED-UP C14 (A EFFECT (Kzt :5 1.0) AS DEFINED IN SECTION &.5.1.2 OF A5CE 1-05. CONTACT ENGINEER OF RECORD IF SUCH EFFECTS ARE PRESENT. 1. PROVIDE PERIODIC SPECIAL INSPECTION FOR FIELD WELDING PER IBC SECTION 1104. 8. STEEL: ALL WELDING SHALL BE PERF-ORMED BY AN-5 CERTIFIED WELDERS USING E-10 ELECTRODES OR WIRES AND AWIS APPROVED SYSTEMS AND PROCEDURES. 13. PROVIDE SLOPE AXAY FROM BASE OF POLE. S 0 S 16 rjf WAS 46286 ox., GIST ef%NA L OkQ� wo I T * A-4 APR 0 5 2011 DEVELOPMENT SERVICES COUNTER (TOP 4 BOT. OF SIGN, 2 MIN.) SCALE� WS. PL 3/a all PIPE FIL 1/4 Y4" MIN. 1/4 Yell GA L 4 4 " M I y AP 4 MAX. j 1/8 2-6 6 4 PLACES 1/4 (EVENLY 1/4 "2i--(-o SPACED) 3/4 x 11/2 10" PIPE PL I (,,\SPLICE DETAIL IS w 0 0 Uj Z d) -i 0 Lj- L) Uj IL Z d)'q w L) Z w LLI L) LU X LU d) 1LU >- 1, LLI Z LU L Z X wa, ff a LL X�l LLI LU (L X Uj 3: uj Y6 Q Z LU -1 W d=1 9 L11 LU 0 rw DESIGN CODE- IBC 2009 wl ASCE 7 Provisions UNITS: POUNDS, FT U.N.0 ASCE 7-05 Wind Loads 6.5.14 F=qh*&*Cf*A, 6.5.10 qh = 0.00256*WKzt*Kd*V2*I K,t= 1.0 (unless unusual landscape) I= I for structural category II Kh= table 6-3 Exposure C Kd= 0.85 for signs I= 500 (constant for L, Table 6.2) V= 85 mph e= 0.2 6.5.8 G=0.925 ((1-1.7*g,*Iz*Q)/(1+1.7*gv*Iz)) or 0.85 C= 0.2 iz=c*(33/zy 1/6) z=max(O.6*h, zmin) zmin= 15 Load Combination Factor 1.0 9,= 3.4 gq= 3.4 Q=4( 1.0 / (1+0.63*(B+h)/LP.63 L,= 1*(z/33)' sign eiem. # n F+ qh C7 s/n B/s f-f pressure. r 1 9.83 0.85 13.36 0.85 0.24 1.70 1.80 20.45 201 2 13.58 0.85 13.36 0.85 0.24 1.70 1.80 20.45 594 3 14.745 0.85 13.36 0.85 0.24 1.70 1.80 20.45 48 4 15 0.85 13.36 0.85 0.24 1.70 1.80 20.45 63 5 17.915 0.9 14.15 0.85 0.24 1.70 1.80 21.65 768 6 19.08 0.9 14.15 0.85 0.24 1.70 1.80 21.65 101 7 20 0.9 14.15 0.85 0.24 1.70 1.80 21.65 201 8 25 0.94 14.78 0.85 0.24 1.70 1.80 22.61 1140 1 sum: 3116 It &TIRUCTURAL TECHNOLOC-3r CONSULTANTE5 INC. 1521 CONVOY COURT, SUITE 40(o, SAN DIEGO, CA 52111 PHONE (656) 218-2400 FAX (855) 218-2424 '0 Lu "w 6, 0 PROJECT: DICK'5 DRIVE IN, 21510 HWY '39, EDMONDS, WA SHEET: 2 OF 2 z PROJ. NO.: 1384-41 DESIGNER: !VH DATE: 03-31-11 CLIENT: IBERRY NEON SIGN SYSTEMS SPLIC V�. 11-02 M = 29361 lb-ft DI = 10 in tl = 0.365 in FExx = 70 ksi P = 1940 lb D2 = R in t2 = 0.322 in Gap = 1.375 in H1 15 in H2 13.625 in z d) -J Cap PL Welding H3 2 in Neglect effect of upper ring Cl M ( 12 HI = 29361 12) 15 23489 lb 02 L, a (DI) n(lo) 31.4 in 1/4 inj :5 t 1 0- '0 Cl/1000 23.489 Lreq'd -- = -- [(0.3)(FExx)(1/16)(42/2)](16)(t.) (0.212) (70) (0.25 tp GUIDE RW3 4 10 6.3 in 9 CaR PL Bendin r-2 Assume cap plate will carry all axial load w :r Take 4 in (D2/2) strip 3/8 tw Fy 36 ksi C-3 L) Z S (132/2) (t,)2/6 = 4 ( 0.375 )2 6 N PLACES LU CK 3 0.0938 in (131-132)/2 1 in (EVENLY KJCK RING SPACED) W. x L. I -- L =' I- L) cl M (P) [(D I -D2)/21 / 2 t 1940(1)/2 = 970 lb -in w 3 fb M/S = 970 0.0938 a- 10341 psi Fb 0.6(36000) 21600 psi lo Lu >- Q-M Check Ring Slot Weldin Ring Compression z w Neglect effect of cap plate (W, + 1/4") 1 �i- C3 = C2 C2 = M ( 12"'.) H2 Neglect effect ofcap plate = 29361 ( 12 13.625 25859 lb Take quarter of inner ring C2 25859 fa = - x "i W, min = tl + 5/16 0.678 in 4(a x D2/4 I n x 8/4) W, = 3/4 in jDM',V','-okj 4116 psi I.- LU L, = 2 x W, 1.50 in F I a 0.6(36000) 21600 psi UL uj > N 4 U F C2/N 25859/4 6465 lb To 'n T fw F / (1, xWj 6465 / (1.5 x 0.75) 5747 psi Fw (0.6FExx)/() = (0.6 x 70) 2.0 Uj L) (L LU 21 ksi = 21000 psi W (L W, min + 1/8 = 0.803 in lose 13f WA S 0. W, max Greater 4, y: '! 2-1/4 x tl 0.821 in 0 1-0 z W, max 0. 8 2 1 i n C:) Ls max 10 x tl 3.65 in ii 6286 RECEIVELE)PI P0 G1 ST '9'9101AVA Uj to L V' APR 0 5 2011 DEVELOPMENT SERVICES, COUNTER w C Z a) I I I I I I I I I I I I I I I I I SW 1/4, NW 1/4, Section 29, Township 27 N. , Range 4 E. , W.M. - - -- - -- - -- - -- - -- - -- - -- - -- 7 Civi engineer. ,71 TO NEAREST JOINT __ 1400" C, S"'W"' WING M ENGIN 79M SEWARD PARK AVE S SEATTLE WA 98118 �_ABOVE. WADE 0 R HOSED ir PHONE- (2D6) 725-1211 DISCHARGE OFACCEPTABLE Site Address sAwoff & REMOVE W�Nl& PROTECT 57-DRIJINATER TOjEX CB EX ASPHALT (TYP) X SA 41 EX �GHT kajiN AFTER SETTILNG. REMOVE 22M ST SW & HIGHWAY 99 -TO _LN �� 11�i 41 EDMONDS, WA NWIS _ 09107"Ir - . -1 - - -HOSE A Surveyor: 4, CRONES & ASSOC. LAND SURVEYORS 1 23806 190TH AVE SE MIT. WA 98042 CONTACT: JEW CRONES PHONII (425) 432-5930 SAVE & PROECT 01 11PH,="'j- /I ;' �; , PRINT SAVE & mricl AS LONG AS EX SUECTRC LINE HSTRU-n GO DISTURBED AREAS ADD .000 ON Utility providers: PAID PER ROVID OR -RENT OR VIPROVED FOR SEDIMENT SqNG SAWARY SEWERS, STORM DRAINAGE, WATER CITY OF EDMONDS PUBLIC WORKS DEPARTMENT > TRIANCULAR SILT 121 5TH AVENUE NORTH DD(E (TYP) EDMONDS, WA 98020 I . CONTACT' R08ERT S. ENGLISH CITY ENGINEER REMK)Vr EX CURB PHONEL (425) 771-0220 POWER NATURAL GAD SAW & PROTECT SNOHOMISH C012M PUT) PUGET SOUND ENERGY 1111 75TIl STREET SW 151 1 1 GTH 1.1 11 EX CURB TO REMAN MI ADDRESS: BELEVUE. WA 98004 PO . 11.7 - 2 - 000 :g WA SWUB �.j -5773 EVI 225 (425) 347-4300 �__SAA & PROTECT I E)( STRUCTURE POr s- TO REMAIN Legend OR CS CCW WOR SHAUL PROVA PE ENUCEPTOR SWALES AND,SUMPS AS 0 COLLECT NECESSARY T PROPERTY LINE a 'T LADEN STORMWATER OUR C59"N EX CONTOUR (INDEX) SUCH THAT IT IS NOT DISCHARGED OFF T FOOPUM -------- EY CONTOUR 0 PUMP SM R .20MOVIORt.L. 0 TE A PRIOR 0 TUFTY [FC ( I REMOVE ELECTRIC PROPOSED BUILDING DI�IC ZIT SHE IT G I f±J/ LINE AS NECESSARY TO COMPOST FILTER SOCK CONSTRUCT PROPOSED REMOVE EX LIGHT IMPROVEMENTS .0. & Pwoq TRANAGULAR SU DIKE STABIM CONSTRUCTION SAWCUT LINE f, . ........ I , \,COMPOST FILTER ASPHALT REMOVAL PROTECT ........... . -lil-RUCTURE S= TO REMAIN CONCRETE REMOVAL A C SAVE & PROTECT EY CURB REMOVAL EX STRUCTURE TO REMAIN (W) TEMP SEDIMENT TRAP FOR CB 0 EX TREE TO REMAIN SS q, 4 0 20 10 20 40 dcale T-20' Erosion and Sedimentation Control (ES 1 . CONSTRUCTION ACCESS ROUTE CONSTRUCTION VEHICLE ACCESS SHNU. K WHENEVER PRACTICAL. UMM TO ONE FIGURE. ACCESS POINTS SHALL BE STABILIZED WITH QUARRY SPALLS OR CRUSHED ROCK TO MINIMIZE THE TRACKING OF SEDIMENT ONTO PUBLIC ROADS IF SEDuENT IS TRANSPORTED ONTO A ROAD SURFACE. THE ROADS SHALL BE CLENNED THOROUGHLY AT THE 00 OF EACH DAY SEDIMENT SKNI BE REMOVED FROM ROADS BY SH043JNG OR SWEEPING AND BE TRANSPORTED TO A CONTROLLED SEDIMENT DISPOSAL AREA WITHIN 24 HOURS. STREET WASHING SHALL BE AUDWED ONLY 47ER SID.-MINT IS REMOVED IN THUS MANNER 2 STABUZADON OF EXPOSED AREAS ALL SOILS EXPOSED By LAND DISTURBING ACTIVITIES SHALL BE STABILIZED BY SUITABLE APPUCATION OF SUPS, INCLUDING. BUT NOT LIMITED TO. SOD. HYDROSEDDING. OR OTHER VEGETATION, PLASTIC WARM OR MULCHING NO SOULS SHALL REMAIN EXPOSED FOR MORE THAN TWO DOS FROM OCTOBER I THROLIGH APRIL 30 A14D NO MORE THAN SEVEN DAYS FROM MAY 1 THROUGH SEPTEMBER 30 3 PROTECTION OF ADJACENT PROPERTIES ADJACENT PROPERTIES SHALL BE PROTECTED FROM SEDIMENT DUIO57ION By APPROPRIATE USE OF VEGETATIVE BUFFER STRIPS, SEDIMENT BARRIERS OR FILTERS. DIKES OR MULCHING, OR BY A COMBINATION OF THESE MEASURES AND OTHER APPROPRIATE BMPS. 4 MANTERANIM' ALL EROSION AND SEDIMENT CONTROL BMPS SMALL BE RE:GULARLY INSPECTED AND MAINTAINED By TIC OWNER TO ENSURE CONTINUED PERFORMANCE OF THEIR WENDED FI;NCnON 5. AS REQUIRED BY THE CITY, OTHER APPROPRIATE BUIPS TO MffXATIE THE EFFECTS OF 94CREASED RUNOFF SRALL BE APPLIED & UNDERGROUND UTILITY ODNSTRUCTM THE CONSTRUCTION OF UNDERGROUND UTILITY UNESSHAUL SPECIFICALLY ADDRESS THE FOLLOWING: A. EROSION COMM FOR EXCAVATED AND STOCKPILED MATERIALS, IS. THE PLACEMENT OF EXCAVATED MATERIAL WHERE CONSISTENT WITH SAFETY AND SPACE CONSIDERATIONS SMALL BE PLACED ON THE UPHILL SIDE OF TRENCHES C. TRENCH DEVATERING S67EMS (MUST DISCHARGE IWO SEDIMENT TRIPS, SEDIMENT PONDS, OR OTHER ACCEPTABLE MEANS). Notes: D TRACKING AND SPILLING OF UAT0445 ON STREETS DUE TO HAULING. 13.S',GRU DRAIN N0 PROTECTION ALL STORM DUN INLETS MADE OPERABLE DURING CONSTRUCTION SUL ELI PROTECTED SO THAT STORM E. DAILY CLEANUP AND STIZEET MAINTENANCL WATER RUNOFT SKNI NOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRS! BEING FILTERE) OR OTHERWISE TREATED TO REMOVE SEDIkIEW 7 ADDIFFIONAL ESC MINIMUM REQUIREMENTS FOR LARGER DEVELOPMEN7.S ALL NN DEVPOPMEW AND REDEVELOPMENT THAT INCLUDE LAC DI5TURSNC ACTIVITIES OF GREATER THIM. OR EQUAL TO. ONE ACRE IN ADDITION TO MEETING THE MI)NDIUM REQUIREMENTS StT FORTH ABOVE SHALL COMPLY WITH ESC KOUIRD414TS LISTED BELOW 8 DELINEATE CLEARING AND EASEMENT UMITS. IN THE FIELD. MARX QLARNG LIMITS AMIOR AW EASEMENTS. SETBACKS. SENSFFAE/CRITICAL AREAS AND THE BUFFER& TREES AND DRAINAGE COURSES 9 SEDIMENT TRAPPING PRIOR TO LEAV.NG THE SITE STIORM WATER RUNOFF SHALL PASS THROUGH A SEDIMENT POND OR SEDIMENT TRAP. OR OTHER APPROPRIATE OMPS SEDIMENT PONDS AND TRAPS. PERIMETER OXES, sDuENI BARRIERS. AND OTHER BMPS INTENDED TO TRAP SEDIMENT ON -SITE SHALL BE CONSTRUCTED AS A FIRST STEP IN GWING THESE Sups SK41 BE FlUkTIONAL BEFORE LAND DISTURBING ACTIVITIES TAKE PLACE EARTHEN STRUCTURES. SUCH AS DAMS, DIKES, AND DINERSONTS SHALL BE SEEDED AND MULCHED ACCORDING TO AN APPROVED TIMETABLE 10 CUT AND FILL SLOPES CUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTED IN A MANNEI THAT WILL MINIMIZE EROSION. IN ADOMON, SLOPES SHAUL BE SjARU2ED IN ACCORDANCE WITH ESC NOTE NO 2 11 CONTROLLING OFF -SITE EROSION PROPERIES AND WATER WAYS DM51REAM FRCM DEVELOPMENT SITES 91ALL BE PROTECTED FROM EROSION DUE TO INCREASES IN THE VOLUME V0.00TTY, AND PEAK FLOW RATE OF STORM WATER RUNOFF FROM THE PROJECT SITE 12.sTABuzAnON OF TIEWPORAW CONVEYANCE CHANNELS AND OUUM' ALL TEMFORAFY ON -SITE CONVEYANCE CHANNELS SHALL BE DESIGNED, CONSTRUCTED AND STAMM TO PREVENT EROSION FROM THE EXPECTED VELOCITY OF FLOW FROM A TWO-YEAR. 24-HOLIR FREQUENCY STORM FOR THE DEVELOPED CONDITION STASWATION ADEQUATE TO PREVENT EROSON OF OUTLETS, ADJACENT STREAM BANKS. SLOPES AND DOWNSTREAM REAM SHALL BE PROVIDED AT THE OUTLETS OF ALL CONVEYANCE SYSTEMS. 14 REMOVAL or TEMPORARY BMPS. ALL TEMPORARY EROSION AND SEDIMENT CONTROL EIMPS SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE ST . A&DTION 15 ACHIEVED OR AFTER THE TEMPORARY SNIPS ARE NO LONGER NEEDED TRAPPED SEDIME14T SMALL BE REMOVED OR STAMM ON SITE. IDSTURBED 5% AREAS RESULTING FROM REIMAL SHALL BE PERMANENTLY STABILIZED. 15 STORM DRAII R&D PROTECTION ALL STORM DRAIN INLETS UAOE OPEIZABLE DURK CONSTRUCTION SHAU. BE PROTECTED SO THAT STORM WATER RUNOFF SHALL NOT ENTER THE CONVEYANCE SYU`EM WITHOUT FIRST KING FILTERED OR OTHERWISE TREATED TO REMOVE SEDIMENT. 16. REMOVAL OF TEMPORARY SUM ALL TWPORARY EROSION AND SEDIMENT COW-ROL BUIPS SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABWATION IS ACHIEVED OR AFTER THE TEMPORARY BMPS ARE NO LONGER NEEDED TRAPPED SEDIMENT SHALL BE REMOVED OR STAMM ON SITE DISTURBED SM AREAS RESULTING FROM REMOVAL SHALL BE PERMANENTLY STABIUZED 17 DFUTERNG CONSTRUCTION SITES DIEWATERING SYSTEMS SHAUL ' DaHARGE INTO AN APPROVED SEDIMENT FILTRATION OR SETTING FACILITY 18 CONTROL OF POLLUTANTS OTHER THAN SEDIMENT ON CONSTRUCTION SITES. ALL POLLUTANTS OTHER THAN SEIXIJENT THAT OCCUR ON SITE OURING CONSTRUCTION SHALL BE HANDLED AND DISPOSED OF IN A MANNER THAT DOES NOT CAUSE CONTAMINATION OF STORM WATER. 19.FINANCAL LIABILITY: FERFORIMCE BONDING, OR OTHER APPROPRIATE FINANI INSTRUMEWs. SIALL BE REQUIRED FOR ALL PROJECTS TO ENSURE COMPLIMCE WITH THE APPROVED EROSION AND SEDIMENT CONTROL PLAN. (ORD. 3013 1 1. 19951 20.ALL SITE WORK MUST COMPLY WITH CITY OF EDMONDS MUNICIPAL CODE- 21.THE TEMPORARY EROSION AND SEDIMENTATION CONTROL SYSTEM SHALL BE INSTALLED AND INSPECTED BY THE D04EERING INSPECTOR PRIOR TO ALL OTHER CONSTRUCTION 22.AS CONSTRUCTION PROGRESSES AND SEASONAL CONDITIONS DICTATE, THE EROSION CONTROL FACTURES SHALL BE MAINTAINED AND/OR ALTERED AS REQUIRED BY THE CITY TO ENSURE EFFECTIVE AND FUNCTIONAL. OROSION/SEDIMENTATION CONTROL 21TEMPORARY SILTATON PONDS AND ALL TEMPORARY SILTATION CONTROLS SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING AND / OR CONSTRUCTION IS COMPLETED, PERMANENT DRAINAGE FACILITIES ARE OPERATIONAL, AD THE POTENTIAL FOR EROSKIN HAS FASSED 24.AUL DISTURBED LAND AREAS SHALL BE SLABIUM AS REQUIRED BY THE CITY OF EDMONDS AS NOTED ELSEWHERE IN THIS PLAN SET. 25.WHERE POSSIBLE NATURAL VEGETATION WILL BE MAINTAINED FOR SILT CONTROL 2&STOCKPILES ARE TO BE LOCATED IN SAFE AREAS AND ADEQUATELY PROTECTED BY TEMPORARY SEEDING AND MULCHING. HYDROSEED PREFERRED. 27.TFIE PUBLIC ROW SIQLL BE 10T CLEAN TRACKING OF MUD AND/OR DEBRIS FROM THE SITE WILL RESULT IN WORK STOPPAGE. Dust Control Note THE CONTRACTOR SRU USE THE FOLLOWING MEASURES TO CONTROL. DUST DURING CONSTRUCTION. 1. ALL TRUCKS LEAVING SITE WILL BE COVERED WITH ROLL04M TARP. I USE WATER SPRAY ON DEBRIS AS NEEDED WHEN LOADING TRUCKS. I 0014ER PILES OF DEBRIS AS NEEDED DUE TO WEATHER CONDITIONS Construction Seauence I SCHEDULE A PRE -CONSTRUCTION MEETING WITH CITY ENGINEERING DIVISION AT 425-771-0220, EXT. 1326. 2 REVIEW ESC NOTES 3 CALL 'ONE -CALL" 0 1-800-424-5555. AND PRIVATE UUUTY LOCATE FOR UTILITY LOCATES. 4 INSTALL ESC MEASURES AND MAINTAIN DUST CONTROL 5 HAVE MOSON CONTROL MEASURES INSPECTED BY CITY OF EDMONDS CITY ENGINEERING INSPECTOR. (ALL TEMPORARY SEDIMENTATION AND EROSION CONTROL MEASURES MUST BE IN PLACE AND INSPECTED PRIOR TO ANY CONSTRUCTION OR STE CLEARING. EROSION AMID SEDIMENTATION CONTROL PRACTICES MD/OR DEVICES SHALL BE MAINTAINED UNTIL PERMANENT VEGETATION IS ESTABLISHED.) 6 SAWCUT & REMOVE EX ASPHALT WITHIN BUILDING AREA 7 CONSTRUCT BUILDING 8. INSTALL UTILITIES AND OTHER SITE IMPROVINENTS. 9. INSTALL CURBS & SIDEWALK& IO.STABIUZE�AND REVEGETATE ENTIRE SITE_ II.ESTABUSH LANDSCAPING AND PERMANENT VEGETATION. EROSION CONTROL FEATURES CAN BE REMOVED UPON FINAL SITE STABRIZATION AND APPROVAL BY CITY INSPECTOR 2 57 Sr j I _1141 14-N ;-IS-W 114 WIN S7 SW PROJECT SITE 11M 511' 170 ZVN S7 SP FIS7 $7 21�0 S7 VY 57 SW Z=2 n5m AT 51' 22M $1 _% k "I '5__'7T1y Vicinity Map NTS Sheet Index C1.0 TESC & SITE DEMOLITION CIA TESC DETAILS C2.0 GRADING. DRAINAGE UTILITIES C2.1 GRADING. DRAINAGE UFFILITTIES NOTES & DETAILS C2.2 GRADING, DRAINAGE UTILMFS NOTES & DETAILS C3.0 PAVING & STRRNG C3.1 PAIANG DETAILS Surveyors Notes FIELD MEASUREMENTS FOR THIS SURVEY PERFORMED WITH A 2" TOPCON TOTAL STATION USING TRAVERSE METHODS THAT MEET OR EXCEED ACCURACY R�OUIREMENTS CONTAINED IN WAC 332.130.090. THIS SURVEY WAS CONDUCTED WHIM THE BENEFIT OF A CURRENT TITLE ROW AND THEREFORE DOES NOT F NIS OR RESTRICTIONS OF R�CORD, IF MY. THIS IS NOT A BOUNDARY SURVEY AND SHOULD NOT BE REUED UPON FOR THE ESTABLISHMENT OF WPRU491DO OF ANY KIND. THE BOUNDMIES SHOWN HEREON ARE FOR REFERENCE PURPOSES ONLY. PROPERTY LINES DEPICTED ON THIS TOPOGRAPHIC SURVEY WERE DETERMINED WITHOUT THE 13ENEFET OF A BOUNDARY SLMY AND ARE SHOWN AS APPROXIMATE THE ACCURACY OF THE PROPERTY LINES ARE NOT GUARANTEED AND ARE NOT INTENDED TO BE USED FOR DESIGN OR PLANNING PURPOSES. I THE BOUNDARY CORNERS AND LINES DERCUi ON THIS MAP ARE PER RECORD TITLE INFORMATION AND REPRESENT DEED LINES ONLY. THEY 00 NOT PURPORT TO SIM OWNERSHIP LINES THAT MAY OTHERWISE BE DETERMINED BY A COURT OF LAW. THIS TOPOGRAPHIIC SURVEY IS IINFENDED FOR GENERAL DESIGN PURPOSES. ADDMONAL SURVEYING MAY BE REQUIRED TO MEET SPECIFIC CITY/10OUNTY AKD/OR ENGINEERING REQUIREMENTS. THIS SURVEY WAS PREPARED FOR THE EXCLUSIVE USE OF THE CUENT NAMED HORIEN. TO BE USED ONLY FOR THE PURPOSE FOR WHITCH IT WAS ORIGINALLY INTENDED. ITS USE DOES NOT EXTEND TO, AND IS NOT AUTHORIZED FOR USE BY ANY UNNAMED PERSON OR PERSONS. THIS SURVEY IS NOT TRANSFERABLE TO ANY OTHER PARTY WITHOUT THE EXPRESS PERMISSIDN AND RECERTIFICATION BY THIS SURVEYOR TO ANMHER PARTY. ALL FOUND SUM EVIDENCE WAS VISITED ON THE DATE OF THIS SURVEY UNLESS OTHERWISE NOTED. COPYRIGHT BY CRONES & ASSOCIATES LAND SURVEYING. Legal Description PORTION OF OF TRACT 40, SOLNER'S IVE ACRE TRALTS, ACCORDING TO THE PLAT THEREOF RECORDED IN VOLUME 7 OF FLATS. PAGE 25, RECORDS OF SNOHOMISH COUNTY. WASHINGTON DESCRIBED AS FOLLOWS: COMMENCING AT THE INTERSECTION OF THE NORTH LINE OF SAID TRACT 40. WITH THE WESTERLY RIGHT OF WAY MARGIN OF STATE HIGHWAY SIR 99 (P.S.H. NO: 1); THENCE S25*43'29'W ALONG SAID WESTERLY MARGIN A DISTANCE OF 98.17 FEEF TO A POINT ON A CURVE TO RE LEFT FROM WHICH THE CENTER BEARS S65'30'59'W 25.00 FEET DISTANT; THENCE NORTHWESTERLY ALONG THE ARC OF SAID CURVE THROUGH A CENTRAL ANGLE OF 3T47'30' FOR AN ARC LENGTH OF 17.36 FEET TO A POINT OF TANGENCY; THENCE N61'16'31*W A DISTANCE OF t6.67 FEET TO THE POINT OF BEGINNING; THENCE CONTINUING N61'16'31'W A DISTANCE OF 48.42 FEET TO THE BEGINNING OF A TANGENT CURVE TO THE LEFT HAVING A RADIUS OF 50.00 FEET; THENCE WESTERLY ALONG THE ARC OF SAID CURVE THROUGH A CENTRAL MGLE 24!54'DO' FOR AN ARC LENGTH OF 21.73 FEET TO A POINT OF TANGENCY', THENCE N8TlD'31'W A DISTANCE OF 163.85 FEET; THENCE S25-43-29-W A DISTANCE OF 106.84 FEET: TH04CE S6,rl6'3l'E A DISTANCE OF 151129 FEET TO THE BEGINNING OF A TANGENT CURVE TO THE RIGHT HAVING A RADIUS OF 17.50 FEET; THENCE SOUTHEASTERLY ALONG THE ARC OF SAID CURVE THROUGH A CENTRAL ANGLE OF 2748*40' FOR AN ARC LENGTH OF 8.49 FEET TO A POINT OF TANGENCY. THENCE S3927'51'E A DISTANCE OF 30.33 FEET; THEM S42*34'03'E A DISTANCE OF 12.14 FEET TO A PONT ON A CURVE TO THE LEFT FROM WHICH THE CENTER BEARS N4701'05'W 86.54 FEET DISTANT; THENCE NORTHEASTERLY kONG THE ARC OF SAID CUM THROUGH A CENTRAL ANGLE OF 2715'26' FOR AN ARC LENGTH OF 33.62 FEET TO A POINT OF TANGENCY; THEM N2543'29*E A DISTANCE OF 172.09 FEET TO THE P0114T OF BEGINNING. Vertical Datum THE ELEVATIONS AND CONTOURS SHOWN HEREON ARE BASED UPON MRS NETWORK, STATION 0 TFILD, ELEVATION DETERMINED TO BE 603.790 FEET. NAVD88. SET AN ONSITE TEMPORARY BENCHMARK: FOUND FIX NAIL ON NE PROP. COR.. ELEVATION = U8.70 FEET. CONTOUR INTERVAL I FOOT. Call 3 Working Da Before " You DIG CITY of EDMONDS t% APPROVED FOR CONSTRUCTION CV-Q 1 1-800-424-5666 NOTE I NOTE: EXCAVATED MI WHICH 0 GAS CONNECTION TO BE COORD VM FSE [ND DUST CONTROL MAY CAN 14CT BE STORED ON Sr 2) ELEC OONNECTOM APPURTE1,1ANCES TO .0 . D DURNG PERIODS BE DISPOSED OF OFF -SUE AT -ALL CITY ENGINEEPING DIVISION DATE BE BE BE COOK) W/ ENCHOMIS1 COUNTY PUD OF El" Y WEATHER. COMMERCIAL FACILUY._ ffj 7936 S..d Pk A. S, SCCIC� WA 98118 p.206.715.1211 U1 E 206373.5344 engineering pllc J. :M7 1 PER CITY COMMENTS 03/31/2DIl D 1. T.b- U V W �k �gtv ;Aj 0 C) S4 'jc� 108-10-01 02/14/2011 As Noted NAY" BRH LJP EX- CHW AM-1 Up TESC 1.0 E HIS Not Used I r-fAVATIV RI IU1 MIN C, �11Y SPALLS 2 1 -:N DIA I#i�AVATAVAVAVVAAVAAVAPAViAPAVqAFAVAViVA�VAF� �IN DEPTH . . . . . . . . . . . . 1Z PROV:D- rL' L wlli� OF ING;r'S/ EGP-"' A -A CONTRACTOR 3P-1 CO'JSTPUCTIDI, EN--�A�jC- DURINS THE CON' 7 Z, C 71014 1111, 111--PECIIDI`� IEG,111�1 0" 11 L EPO-I'l 1011-�OL MEA�:U'ES BEFDFE WE" CAN FGTN CIT, OF. EE)MOilDS.. S TI\ ' i D A P D -D ETAI L STAMM CONSTRUCTION ENTRANCE "S COE STD Detail E 1.2 - Stabilized Construction Entrance 2 TOP Of DRUM O.=356 RUNOff WITH SM" PROVIDE SOLD COVER STOLE, IDE I* MIN DFM SUMP NO DRUM FM 11-96LER-TANK -�,APRDN ON THIS APRON SIDE OF THE DIKE SHOULD BE FOLDED FILM RUNOFF UNDER THE DIKE SECTION AND CONSTRUCTION AREA STAPLED DOWN w 'PROVIDE 6' MIN CLEAN GRAVE d AROUND PERIMETER OF DRUM FLOW WW WITH FILTM FABRIC A A 55 GALLON DRUM OR EQUAL W1 -T 2M WEEP MOM NOM. 3--6' TRENCH 1. STAPLES SMALL BE PLACED WHERE THE UNITS OVERLAP AND IN THE CENTER OF THE 7' UNIT AS SHOWN ON THE DIAGRAMS WRE TIES STAPLES ZL STAPLES WATER SUMP PUMP AND MOTOR W/ 125 GPM MIN, CAPACITY -MFL% T WEE —UWrTS OF SEDIMENT CONTROLLED AREA CONCRETE BLOCKS "S Triangular Silt Dike 5 Moveable Sump &Pump 6 /GRATI ITH F cATCH BASIN I 7 < STRAW EI ES BE USED IN UMA CEFTAIN CIRC ISTANCES (SEE D TAIL E11,1 THIS APPLICAITDN SHALL BE MAINTAINED AT ALL T IMES DURING CONSTR UCITON PERIOD IRNESSPEBCETFIOON REQUIRED ON A[ rROSION CONT7 [EITY MEASU RE WOR� CAN BEGIN CITY �QF EDMONDS.,.I., �EVISIOIJS STAI`JDARD DETAIL "' 'R D —FIT SEZWTRAP FOR CATCH SAM N,S E1.3 COE STD Detail E 1.3 - Temporary Sediment Trap for Catch Basins 3 Not Used 7 COMPOST SOCK 1. COMPOST SHALL BE IN ACCORDANCE WITH WSDOT STANDARD SPECIFICATION 9.14 18 - COMPOST SOCK SHALL BE A MINIMUM OF Ol IN DIAMETER OR SZED TO SUIT CONDITIONS AS SPECIFIED BY T ENGNEER HE _ SOCK MATERJAL SHALL BE BIG DEGRADABLE, PROVIDE COMPOST SDC BY CEDAR GROVE COMPOSTING, OR APPROVED EOUIVALENT. 2.AUWAYS INSTALL COMPOST SDCK PERPENDICULAR TO SLOPE AND ALONG CONTOUR UNES, 3.REMOVE SEDIMENT FROM THE UP SLOPE SIDE OF THE COMPOST SOCK WHEN ACCUMULATION HAS REACHED �2Z THE EFFECTIVE HEIGHT OF THE CIDIAPOST REASON: TO INTERCEPT & DETAIN SMALL AMOUNTS OF SEDIMENT UNDER SHEET FLOW CONDITIONS FROM DISTURBED AREAS DURING CONSTRUCTION. TO DECREASE VELOCITY OF SHEET FLOWS. His Compost Filter Sock 41 Not Used 8 ... SmW Pk A- S. S.W,WA98118 P. 206.725.1211 C Non .... mmm engineering pllc J. 7 L I PER CITY COMMENTS 03/31[2011 0 r T..n— M� C*), C, 0 108-10-01 0 /14/2011 IL20' 13RH - UP CHW 'q- UP TESC Details C1.1 I EX 8' SS (TOP FOODS� CIN=.80,F V LATERAL TO BE VERIFIED .M..E - 'a THE UEPAWO .11 PUI3UC WORKS SEWER OMSION AT 425,771.02B7-- CONNECT TO EX 8' SS IE 345.32 (61 (!� 8800 3 -05WO—= Wil­ EX GAS-,, _T NSO #Z SDOO RW-355.7— E M18 (6 E) Z7 LIF V SO 0 2 0% MIN, 13 LF 6' SS 0 1&0% - TRASH ENCLOSURE PER ARCH DWGS SHT 2 SURFACE RUNOFF & WASHING WITHIN TRASH bEO!i�RE WILL DRAIN TO SS CREASE INTERCEPMR 61 2-CA 2000 GALLM RIM 355.97 C 3%911 �15' N OUT HE .14 S� IN 6' ID CTYP) 1 22 LF 6" ss 0 �mz_ IE -352 09 A' SS) TP, 391 (6- SS)f so TZ9N PIE.' mxu THIS sHbET! "I mm �_. IP *-40 I APPRO, LOCATION OF ' CAS_ COORD,'W/ PSE REDUCED PRESSURE BACKFLT ASSEME OT 0' I�Z I' WA. METER 74� 10. *� - DICKS DRT�E IN) 101 LF I* WA SERVICE - A -A �_11"A ft __ - �_ CON0 0(8' LF e SS T' &51 �2 78 (61 SW 1/4, NW 1/4, Section 29, Township 27 N. , Range 4 E. , W.M. Fall &a64 IE 354 44 (6- N) APPROX DEPTH TO LOCATION FOR S40HOLOSM TOP OF SEWER AT COUNTY PUD TRANSFORMER It VAULT cc ELEC CROSSING - 9.8' , COORD W/ SNOHOMISH COUNTY PUB 'x V. 7 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -ROOF- 6�ROUTD SM DRARS:ROUrED-*1KA _"-APPROX PER ARCH Ed RWTING I�j.2 7`� COORD W/ SNOHOMISH -a u RDOF'OS-OXYUGHT-TO-j- EIDTIOM EL-354 0 - am.,07 �c , TOP OF WS MO COUN1Y_PUD-_ swmmxl ROCK SO SIDOO RIM 3545 P It 353.5.(6 E) _k!i "Qj 51 LF 6* SO 0 M2 W24 V/ NVIOPLAST '10- ROUND W/ DomEa 355.0 0 15% MIN 'Wro �v S 7 LF 6 SO It 0 wo 20% MIN E T51 83. 4-W � IN) 65 LF fSD_;?, 15% M14 55_7 6 Cr 40 TO D I .I TO of SO I VAULT 7 at 35 (61 SO R RW B HE 354 3 3555M EX UN 12:1 MAX f. I CEFENTIO I 1 7 SLOPE (61 E 352 64 -1 I�UF 6 SS 0 182 PROPCISM MATCH W/ EX eLCK3 PROP PVUT CRADE it (61 CURB FF 35&8 PROVIDE 6 YAM FUEFEBR To LA PLAA FOR IRRKIATKIN LAYOUT TU_ CHECK V. IRRIGATION UNE.. r 70 ad EX WA MAIN ESVT�,' _'!HAGCEN)'I J, LNIVERVIOUS SURFACE CHART A - Line Type Acea (square reat) 1. Non-Repla led 0 Exempt Regulated 2. Replaced 0 10,31011 3. 4. Ne. (Po�l 1977) 44444 -) 4 -> 4 + M.,==Impavlous .-­f2Am'f 0 10,310 5. 6. T.Isd A... MUlptd by F..istig St —ter -MummUmneat Systemo(s) Replated Arm Not Yet Mitigated 7. Ann proposed to be Mitipld! by Lune Impact Development Techniques & Am proposed to be Mitipted flumugh C—lional SW.Nl Techniques PLEASE NOTE THAT urLrry TFENcH REPAIR AND REPLAcED LrBmow SURFACE 6 NOT NC� + WON " I . , . . , RESTORE BCMTR ATIC.4 PATIO CE SWALE 10 EX AREA, PRE CONSTRUCTION CON6TTIONS RAISE R I I I TO GR I ADE ED PARKING SOUD rN STALL SKID YOUR PER Ui C-30 IF EX PVMT G-WE It ATCH W1 EX PROVIDE 6* CURB TP 355M 3GN PYLON PER ARCH VWCS LAN . . . . . . . . . . . . . . MATCH W1. EX PVUT &RABE Ar PROVIDE 6',CURB CONNECt W A� E� ?040 POLE 20 0 10 20 40 Scale 1'-20' 14 Legmd PROPERTY LINE EX CONTOUR (INDID0 EX CONTOUR PROPOSED BUILDM CONCRETE WALKWAY CONCRETE PAVEMENT ASPHALT PAVEMENT LANDSCAPING FF 78.0 FINISHED FLOOR ELEVATION REDUCED PRESSURE RACITLOW ASSEMBLY IN HOT DOY _I_tDOUEILE WATER SERVICE LINES WATER METER RRIGAIDON LINE CHEO( VALVE TR04M DRAIN AREA DRAIN STORM DRAXACE PIPE (SDCO) DOWNSPOUT 230 PROPOSED CONTOUR SPOT ELEVATION VERTICAL CURB 0 EX TREE TO ROM WS WATER,SURFACE LA LANDSCAPE ARCHITECT ARCH ARCHITECT TRENCH DRAIN, SCHEDULE TRENCH NO. QUANTITY 8601 1 8602 1 8603 1 8604 1 8605 1 8606 1 8607 1 8608 1 8609 1 THE TRE14CH NO. LWED ABOVE IN THE TRB4CH DRAIN SCHEDULE ME PER ZURIN! TFfiRXH DRAN MrEM MIX THE TREI� MANS SHALL BE ZURN1 OR APPROVED EQUAL THE TFeXH DRM SCHEDULE NXATES FROM UPSIFIEM TO DmvwFEm (ExIDEPT FoRv wFIERE ONE oF EACH OF 1HE FM M ffEW SLOPE TOWARD, THE NICIDILE FROM EAa.i E10) THE TRBCH DRAW SCHEDULE IS APMXUATE AND SHALL EE vERFm wrrH TFE mamsai PFm To mum RD CONEFITRUCTIONIL (D GAS CONECT11014 TO BE COORD VATH PSE (Z PROV11DE Wa&U V SEPARATM SlETIMEEN SAWARY SEWER AM WATER SERVIM LM ALL UMM WIRES FOR M-E SLS*CT DIVASLOPMEW SHALL BE PLUM UNDERGROkM CITY of EDMONDS APPROVED FOR CONSTRUCTION Call 3 Working Day$ Before You 010, 1-600-424-i'565 CITY ENGINEERING DIVISION DATE Pat A. S, SCOI; WA % I IS N m p.2X'rS.1211 engineering plIc J. Z �Q Dam I PER CITY COMMENTS 03/31/2DII r RA Scib v - smk �0' CPN 0 C10 > T-4 pm' 108-10-01 n"u" . 02/14/2011 S.m As Noted Now� BRH Lip D­� CHW AW� Up Dma". Grading Drainage & Utilities sw C2.0 E Cleneral Notes 1. ALL MATERIALS AND WORK SHOWN ON THESE PLANS SHAJ. CONFORM TO THE CITY OF EDMONDS STANDARD PLANS AND DETAILS. THE FOLLOWING SPECIFICATIONS AND CODES, AND ALL OTHER APPLICABLE LOCAL MUNICIPAL. STATE, AND FEDERAL OCIDES, RULES AND REGULATIONS, - CURRENT INTERNATIONIV. BUILDING CODE (BC) - 2wo ww/Apu STANDARD SPECIFICATIONS FOR ROAD. BRIDGE AND MUNICIPAL CONSTRUCTION - WASHINGTON STATE DEPARTMENT OF ECOLOGY STORUWATER MANAGEMENT MANUA. FOR THE PUGET SOUND BASIN (CURRENT EDITION) 2. STANDARD PLAN AND TYPE NUMBERS INDICATED ON THESE DRAWINGS REFER TO CITY OF EDMONDS STANDIM DETAILS, LINKERS NOTED OTHERWISE 3. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOBSITE WHENEVER CONSTRUCTION IS IN PROGRESS. 4. DEVIATICRIS FROM THESE PLANS MUST BE APPROVED BY THE ENGINEER OF RECORD AND THE LOCAL GOVERNING AUTHORITY. 5. CONTRACTOR 91ALL RECORD ALL APPROVED DEVIATIONS FROM THESE PLANS ON A SET OF 'AS-BU[LT` DRAWINGS AND SHALL SUMMARIZE ALL AS -BUILT CONDITIONS ON ONE SET OF REPRODUCIBLE DRAWINGS FOR SUBMITTAL TO THE OWNER PRIOR PROJECT COMPLETION AND ACCEPTANCE. A SET OF AS-BULT DPAWINGS SHALL BE SUBMITTED TO THE CITY OF EDMONDS PRIOR TO FINAL APPROVAL OF THE BUILDING OCCUPANCY/FINAL PROJECT APPROVAL 6. ELEVATIONS SHOWN ARE W FEET . SEE SURVEY FOR BENCHMARK INFORMATION. 7. THE LOCATIONS OF DEW UMUTIES AND SITE FEATURES SHOWN HEREON HAVE BEEN FURNISHED 13Y OTHERS BY FIELD SURVEY OR OBTAINED FROM AVAILABLE RECORDS AND SHOULD THEREFORE BE CONSIDERED APPROXIMATE ONLY AND NOT NECESSARILY COMPLETE IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO INDEPOIDENICY VERIFY THE ACCURACY OF ALL UTILITY LOCATIONS SHOWN AND TO FURTHER DISCOVER AND PROTECT ANY OTHER UTILITIES NOT SHOWN HEREON WHICH MAY BE AFFECTED BY THE IMPLEMENTATION OF THIS PLAN. CONTRACTOR SHALL VERIFY LOCATION, DIEPTH, SIZE. TYPE AND OWIDTION OF EXISTING UTILITY LINES AT CONNECTION OR CROSSING POINTS BEFORE TRENCHING FOR NEW UTILITIES. ENGINEER ASSUMES NO RESPONSIBILITY FOR THE COMPLETENESS OR ACCURACY OF THE DMNG UTILITIES AND SITE FEATURES PRESENTED ON THESE DRAWINGS. ENGINEER SHALL. BE NOTIFIED IMMEDIATELY OF CONFLICTS THAT ARISE 8. CONTRACTOR SHALL LOCATE AND PROTECT ALL UnUM DURING CONSTRUCTION AND SHALL CONTACT THE UNDERGROUND UTILITIES LOCATION SOUCE (1-800-424-5555) AT LEAST 2 BUSINESS DAYS PRIOR TO CONSTRUCTION. 9. CONTRACTOR SHAUL VERIFY ALL CONDITIONS AND DIMENSIONS AT THE PROJECT SITE BEFORE STARTING WORK AND SHALL NOTIFY OWNER'S REPRESENTATIVE OF ANY DISCREPANOM 10 PIPE LENGTHS WHERE SHOWN ARE APPROXIMATE AND MAY CHANGE DUE TO FIELD CONDITIONS. ILCONTRACTOR SHALL NOTIFY UITILITY OWNERS WITHIN THE CONSTRUCTION LIMITS, A MINWUM OF TWO WEEKS PRIOR TO EXCAVATION, OR OTHER CONSTRUCTION ACTIVITY THAT MAY IMPACT THE UTILITY. CONTRACTOR SHALL ALSD CONTACT I-BOO-ONECALL PRIOR TO ANY CONSTRUCIION ACTIVITY IN THE AREA. CONTRACTOR SHALL PROVIDE ACCESS TO UTILITY OWNERS FOR MkHTENANCE AND WORK ON THOR UTILITIES DURING THE COURSE OF THE WORK. 12 RELOCATIONS MD/OR REPLACEMENTS OF OWING UTILITIES SHAUL BE COORDINATED BY THE CONTRACTOR WITH THE UTILITY OWNER. MMA70R SKALL CONTACT, SCHEDULE, AND ESTABLISH UTILITY SHUT DOWN TIMES AND DETERMINE THE RELOCATION AND/OR REPLACEMENT REOLARDISINTS OF EXISTING UTILITIES PRIOR TO THE START OF ANY WORK. THE UTILITY SHALL BE RELOCATED OR REPLACED TO THE SATISFACTION OF THE UnU`rY MO. Excavation. Grading, and Fill: 1. EXCAVATION, FILL AND GRADING SHALL CONFORM TO THE 2006 INTERNATIONAL BUILDING CODE AND CITY REQUIREMENTS. WORK SHALL PROCEED TO THE FINISHED SURFACES AT THE ELEVATIONS AND CONTOURS SHOWN ON THE DRAWINGS. 2. APPROXIMATE LOCATIONS OF EXISTING UTILITIES HAIVIE BEEN 'OETAINED FROM AVAILABLE RECORDS AND ARE SHOWN FOR CONVENIENCE THE CONTRACTOR SHALL BE RESPONSBUE FOR VERIFICATION OF LOCATIONS AND TO AVOID DAMAGE TO ANY ADDITIONAL UFLITIES NOT SHOWN. F CONFLICTS WITH EXISTING UTILITIES ARISE DURING CONSTRUCTION. THE CONTRACTOR SHAUL NOTIFY THE ENGINEER AND ANY CHANGES REQUIRED SHALL BE APPROVED BY THE ENGINEER PRIOR TO COMMENCEMENT OF RELATED CONSTRUCTION ON THE PROJECT. 3. MATERIALS EXCAVATED IN AREAS REQUIRING CUT GRADING MAY BE USED As FILL IF THEY MEET THE REQUIREMENTS FOR FILL MATERIAL COINED BELOW. NO BOULDERS. CONCRETE OR ASPHALT CHUNKS GREATER THAN 4' IN ITS LARGEST DIMENSION MAY BE USED. SUCH MATERIAL SHALL BE DISPOSED OF OFF-STTE LEGALLY. 4. AFTER CLEARING & GRUBBING IS COMPLETE, THE GROUND SURFACE 91ALL BE PREPARED As FOLLOWS., A. ALL AREAS TO BE SURFACED WITH PAVEMENT, CONCRETE WCCS OR STEPS, AND BUILDING SLABS SKALL HAVE THE TOP 12- OF EXISTING SOILS SCARTIED AND RECIDLIPACTED TO AT LEAST 95% OF THE MAXIMUM DENSITY DETOUNED BY ASTM D-1557 (MOCIFIED B. PRIOR TO RECOMPACTION OF THE SCARIFIED MATERIAL ALL AREAS SHALL BE PROOF ROLLED IN THE PRESENCE OF THE GEOTECHNICAL ENGINEER OF THE OWNER'S CHOICE. ANY AREAS DEEIM UNSUITABLE BY THE GEOTECHNICAL ENGINEER SHALL BE OVEREXCAVATED AND REDUCED WITH COMPACTIED FILL MATERIAL AT AN AGREED UNIT PRICE BASED ON TRUCK MEASURE OF REPLACEMENT FILL 5 IMPORTED FILL SHALL BE FREE -DRAINING GRAIN" MATERIAL WITIOLIffORGANICS, AND SHALL CONFORM TO WSDOT SECTION 9-03.10 FOR GRAVEL BASF 9-03.14 FOR GRAM! BORROW, OR ALTERNATE MATERIAL APPROVED BY THE ENGINEER IN WRTTNG PF40R TO ITS USE. FILL SHALL HAVE NO MORE THAN 5% PASSING THE 1200 SIDE 6 SUBMIT SAMPLES OF PROPOSED FILL MATERIAL FOR TESTING FOR THE DETERMINATION OF THE OPTIMUM MOISTURE - DENSITY RELATIONSHIP PER ASTIM D-1557 (MODIFIED PROCTOR), PRIOR TO ANY TUNG OR OVEREXCAVATION AND REPLACEMENT. 7. PLACE FILL IN W THICK mauum uFrs (Lo osE) AND COMPACT To 952 OF THE MAXIMUM DRY 004SUY PER ASTMI D-1557 (MODIFIED PROCTOR). B. COMPACT ALL FILL USING SLOTABLE COMPACTION EQUIPMENT. 9. ADD MOISTURE TO THE SOILS OR SCARIFY TO OFTY SOILS AS NECESSARY TO ACHIEVE SPECIFIED COMPACTION. 10.00NTRACTOR IS RESPONSIBLE FOR SOIL AND COUPACflON TESTING IN CONFORMANCE WITH THESE SPECIFICATIONS. 11. SOILS WAY A.SID BE TUB BY OWNER 12. CONTRACTOR SHALI STRIP AND RE -COMPACT ALL SOILS NOT MEETING SPECIFIED COMPACTOR AT NO ADDITIONAL COST 70 OWNER. 13. FOR PLACEMENT OF BALLAST. GRAVE BASF, ANDIOR CRUSHED SURFACING BENEATH ASPHALT CONCRETE PAVING (ACP), REFER THE TYPICAL PAVEMENT SECTION. 11 THE CONTRACTOR SHALL TAKE ALL PRECAUTIONARY MEASURES NECESSARY TO PROTECT IMPROVEMENTS FROM WAAGE AND ALL SLO NPROVEMENTS OR STRUCTURES DAMAGED BY THE CONTRACTOR'S OPERATIONS SMALL BE RECONSTRUCTED TO THE SATISFACTION OF THE OWNER AT THE EXPENSE OF THE CONRCTOR. 14. EXCAVATION SHALL MEET THE REOUREUENTS OF OSHA 29 CFR PART 1926. SUBPART P. COVATIONS. ACTUAL SLOPES SHALL NOT EXCEED THE MAODMUM ALLOWABLE SLOPES. . IS. ANY DISCREPANCIES FOUND BETWEEN THE DRAWINGS AND ACTUAL SITE CONDflIONS, OR ANY INCONSWENCIES OR AMBIGUITIES BETWEEN THE DRAWINGS AND OTHER COMPONENTS OF THE CONTRACT DOCUMENTS SHALL BE IMMEDIATELY REPORTED IN WRITING TO THE ENGINEER. THE ENGINEER WILL PROMPTLY CORRECT INCONSISTENCIES OR AMMES IN WRITING. WORK DONE BY THE CONTRACTOR AFTER Its DISCOVERY OF SUCH DISCREPANCIES WITHOUT A WRITTEN REPORT AND RESPONSE FROM THE ENGINEER. MALL BE DONE AT THE CONTRACTOR'S RISK AND EKPME I&ALL DMENSONS. INCLUDING, BUT NOT LIMITED TO ELEVATICINS, STATION% AND DISTANCES ARE IN STANDAR? ENGLISH UNITS. 17.PRCTECT EXISTING FACILITIES AND NPROVEMENTS FROM DAMAGE USE CARE WHEN EXCAVATING ADJACENT TO EXISTING UnUTE&. 18.00STING PIPING, EQUIPMENT AND TOPOGRAPHY ARE SHOWN SCREENED AND/OR LIGHTENED. NEW PIPING. EQUPMENT, STRUCTURES, AND FINISH GRADE IS SHOWN HEAVY LNED. 19. ALL CALLOURS AND NOTES ARE DIRECTED TO THE CONTRACTOR UNLESS SPECIFICALLY STATED OTHERWISE 20.PROTIECTION OF THE ENMRIDNMENF: NO CONSTRUCTION RELATED ACTIVITY SHALL CONTRIBUTE TO THE DEGRADATION OF THE ENVIRONMENT, ALLOW MATERIAL TO ENTER SURFACE OR GROUND WATERS, OR AULDWI PARTICULATE EMISSIONS TO THE ATMOSPHERE. WHICH EYCEED STATE OR FEDERAL STANDARDS. ANY ACTIONS THAT POTENTIALLY ALLOW A DISCHARGE TO STATE WATERS MUST HAW PRIOR APPROVAL OF THE STATE OF WASHINGTON. DEPARTMENT OF ECOLOGY. 2LOONSTRUCTION SHLALL BE CONDUCTED IN STRICT ACCORDANCE WITH PERMIT RESTRICTIONS AND PUBLIC FACILITY ACCESS RESTRicnoNs. 22.PREVENT THE TRANSPORT OF SEDIMENT FROM THE SITE AND PREVENT SEDIMENT FROM ENTERING ALL STORM DRAINS WHICH RECEIVE RUNOFF FROM THE DISTUMED AREA. 21PREVENT ON-SffE EROSION BY STABILIZING ALL SOILS, INCLUDING STOCKPILES THAT ARE TEMPORARILY EXPOSED. 24.01ONTRACTOR SKALL OBTAIN AND PAY FOR ALL POUTS REQUIRED FOR INSTALLATION OF ALL IMPROVEMENTS INDICATED ON THESE DRAWINGS. 25.AS A MINIMUM REQUIREMENT, ALL DISTURBED AREAS ON AND OFF SITE SHAUL BE RETURNED TO THE EQUIVALENT OF THOR PRECONSTRUCT10N CONDITION IN ACCORDANCE WITH APPROPRIATE REQUIREMENTS AND STANDARDS. 26.AUL DISTURBED SOIL AREAS SHALL BE SEEDED OR STABILIZED BY OTHER ACCEPTABLE MErHODS FOR THE PIRDIENTON OF ON-SFE EROSION AFTER THE COMPLETION OF CONSTRUCTION. SEE EROSION CONTROL PLANS FOR SPECIFIC GRADING AND EROSION CONTROL REQUIREMENTS. 27.THE CONTRACTOR SHALL KEEP STREETS CLEAN AT ALL INES BY SWEEPING. WASIHING OF THESE STREETS WILL NOT BE ALLOWED WITHOUT PRIOR APPROVAL 28. THIS PROJECT IS NOT A BALANCED IEARTHWORK PROJECT. BOTH EXPORT AND IMPORT OF SOIL AND ROCK MATERIALS ARE REQUIRED. 29.00NTRACTOR SHALL BE RESPONSIBLE FOR AND SHALL INSTALL AND MAINTAIN SHORING AND BRACING AS NECESSARY TO PROTECT WORKERS, DOW BUILDINGS, WALLS, STREETS. WALKWAYS, UTILITIES A14D OTHER EXISTING AND PROPOSED IMPROVEMENTS AND EXCAVATIONS AGAINST LOSS OF GROUND OR GAMING EMBANKMENTS. CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR REMOVAL OF SHORING AND BRACING, AS REQUIRED. NIS Excavation, Grading & Fill Notes 5 30.CQNTRACTOR SKALL OBTAIN APPROVAL FROM THE CITY AND FOLLOW CITY PROCEDURES FOR ALL WATER SERVICE INTERRUPTIONS. HYDRANT SHUTOFFS. STREET CLOSURES OR OTHER ACCESS RESITUCTIONS. CONTRACTOR SHAI NOT RaOCATE OR ELIMINATE ANY HYDRANTS WITHOUT FIRST OBTAINING WRTTIEN APPROVAL FROM THE FIRE ILARRiAL 31.00ORDINATE AM ARRANGE FOR ALL UTILITY CONNECTIONS, UTILITY RELOCATIONS AND/OR SERVICE INTOMPTI WITH THE AFFECTED OWNERS AND APPROPRIATE UTILITY COMPANIES. CONNECTIONS TO EXISTING UTILITIES SHALL BE MADE ONLY WITH ADVANCE WRITTEN APPROVAL OF THE AUTHORITIES GOVORNING SAID UnUMS. 32.EGSTING UTILITY LINES IN SERVICE WrICH ARE DAMAGED DUE TO CONSTRUCTION WORK SHALL BE REPAIRED AT CONTRACTOR'S EXPENSE AND INSPECTED AND ACCEPTED By CITY OF Ecum AND OWNER'S REPRESENTATINE PRIOR TO BACIMNG. 31NEW UnUTY LOCATIONS ARE GENERALLY SHOWN BY DIMENSION, WHERE NO DIMENSIONS ARE INDICATED, LOCATIONS UkY BE SCALED FROM DRAWINGS. FIELD ADJUSTMENTS SHAUL RE APPROVED BY OWNER'S REPRESENTATIVE AND CITY. 3CCONTIRNI SHNUL 09TAIN A COPY OF THE GEOTEDINCAL REPORT (WHERE APPLICABLE) AND SHALL THOROUGHLY FAMIQUARIZE HIMSELF WITH THE CONTENTS THEREOF. ALL SITE WORK SHALL BE PERFORMED IN STRICT COMPLIANCE WITH THE RECOMMENDATIONS OF THIS REPORT. 35.STRUCFURAL THU. MATERIAL AND PLACEMENT SHALL CONFORM TO THE RECOMMENDATIONS OF THE PROJECT GEOTECHNICAL REPORT. 36.MANHOLES. CATCH BASINS, UI1U`nES AND PAVEMENT SKALL BEAR ON MEDUM DENSE TO VERY DENSE NATIVE SOIL OR COMPACTO STRUCTURAL FILL IF SOIL DISTURBED IS. SOFT. LOOSE. WET OR IF ORGANIC MATERIAL IS PRESENT AT SUBGRADE ELEVATION, REMOVE AND REPLACE WITH COMPACTED STRUCTURAL FILL PER GEOTECHNICAL REPORT. 37.SEE SURVEY AND ARCHITECTURAL DRAM FOR DIMENSION AND LOCATIONS OF BUILDINGS, LANDSCAPED AREAS AND OTHER PROPOSED OR EX]STING SITE FEATURES. 38.SEE DRAINAGE PLAN FOR PERIMETER FOUNDATION BROS. FOUNDATION DIWNS SHU BE INDEPENDENT OF OTHER SITE DRAIN ONES AND SHALL BE TIGHTLINED TO THE STORM DUN SYSTEM WHERE INDICATED ON THE PLANS. 39.ALL REQUIRED STDRWWATER FACILITIES MUST BE CONSTRUCTED AND IN OPERATION PRIOR TO INSTALLATION OF ANY PAVEMENT UNLESS OTHERWISE APPROVED BY THE ENGINEER. 42.AUL ROOF DRAINS, PERIMETER FOUNDATION DRAINS, CATCH WINS AND OTHER WERNAL DRAINS SHALL BE CONNECTED TO THE STORM DRAINAGE SYSTEM, UNLESS NOTED OTHERWISE. 43.SUOPE OF FINISHED GRADE SHALL BE CONSTANT BETWEEN FINISHED CONTOURS OR SPOT ELEVATIONS SHOWN. 44.nNISHED GRADE SHULL SLOPE AWAY FROM BIALDING WAU.S AT MINIMUM 22 SLOPE FOR A MINIMUM DISTANCE OF 5 FEET. 45.WHERE NEW PIPE CLEARS AN EXISTING OR NEW UTILITY BY 6' OR LESS PLACE POLYETHYLENE PLASTIC FOAM AS A CUSHION BETWEEN THE UTILITIES. 46.SEE MECHANICAL. DRAWINGS (WHERE APPLICABLE) FOR CONTINUATION OF SITE UTILITIES WITHIN THE BUILDING 47.SEE ELECTRICAL DRAVANGS (WHERE APPLICABLE) FOR INTERIOR ELECTRICAL WORK 48.SEE LANDSCAPE DRAWINGS (WHERE APPLICABLE) FOR SITE tRRKATToN SYSTEM. Storm Drainage Notes- 1. UNLESS OTHERWISE NOTED, ALL STORM DRAIAGE (SD) PIPE SHALL BE CORRUGATED HIGH DENSITY POLYETHYLENE PIPE (CPEP) WITH SMOOTH INTERIOR CPEP SHAUL BE ADS N-12 OR HANCOR HI-1 OR EQUAL AS APPROVED BY THE CITY PRIOR TO CONSTRUCTION. WHERE OTHER PIPE IS INDICATED. IT SHALL BE REINFORCED CONCRETE PIPE (RCP). ASTM C-14 (24- DIAMETER AND LARGER TO BE REINFORCED ASTM C-76), OR CORRUGATED METAL PIPE (CUP). CUP TO BE GALVANIZED SM WITH TREATMENT I ASPHALT COATING OR BETTER. ALL ROD AND CUP SHWi FLAVE RUBBER GIISKETS. MINIMUM COVERAGE REQUIREMENTS FOR PIPE SHALL BE PER MANUFACTURER'S REQUIREMENTS. 2 ALL PIPE SHAU. BE PLACED ON STABLE EARTH, OR F THE EXISTING FOUNDATION IS UNSATISFACTORY. THE CONTRACTOR SHALL OVER EXCAVATE AND BACKFUl WITH A GRAVEL MATERIAL AS NECESSARY TO SUPPORT THE PIPE. 3 PIPE BACKFILL SHALL BE PLACED EQUALLY ON BOTH SIDES OF THE PIPE OR PIK-ARCH IN L096 WITH A LOOSE AVERAGE DEPTH OF 6-, W=UU DEPTH 8'. THOROUGHLY TAMPING EACH LAYER. THESE OOMPXTEO LAYERS MUST EXTEND FOR ONE DIAMETER ON EACH SIDE OF THE PIPE OR TO THE SIDE OF THE TRENCH. MATERIALS TO COMPLETE THE FILL OVER PIPE SHALL BE AS SHOWN ON THE PLANS AND INDICATED IN THESE AND THE REFERENCE) SPECIFICATIONS. 4 ALL GRATES (INLET AND CATCH BASIN) SHALL MATCH PAVEMONT/CURB ELEVATIONS. 5 ALL CATCH BASINS SMALL. CONFORM TO WSDOT STANDARD TYPE 1, UNLESS OTHERWISE NOTED. 6 THE C0N`RkCTOR SHALL BE RESPONSIBLE FOR ADJUSTING ALL MANHOLE, NET, AND CATCH BASIN FRAMES AND GRATES JUST PRIOR TO POURING OF CURBS AND PAVING. 7 ALL CATCH BASINS WIN A DEPTH OVER 5.0 FEET TO THE FLOW LINE SHALL BE A TYPE 2 CEL 8. ALL MANHOLES AND CATCH BLASINS SHALL HAVE LOCKNG LIDS. 9. STANDARD POLYPROPYLENE LADDER STEPS SHALL BE PROVIDED IN ALL CATCH BASINS/MANROLES EXCEEDING 5 FEET IN DEI'TH, IO.CATCH BASINS SHALL HAVE STANDARD CAST IRON FRAME AND GRATES. ILAUL STORM DFAN WORK MUST BE STAKED FOR UNE AND GRADE PFWR TO STARTING CONSTRUCTION. 12.STORM WATER REITNTON/DEFENTION FACILITIES, STORM DRAINAGE PIPE AND CATCH 84NS SMALL BE FLUSHED AND CLEANED PRIOR TO CITY OF EDMONDS ACCEPTANCE. 13.PRIOR TO ANY SITE WOW PERTAINING TO DRAINAGE. THE CONTRACTOR SIRALL CONTACT THE CITY OF EDMONDS TO SCHEDULE AN INSPECTION. 14.THE WANIZE SYSTEM SHALL BE INSTALLED 11 ACCORMANCE WITH THE APPROVED PLAN. I5.ONE SET OF APPROVED DRAINAGE PLANS SHALE 13E ON -SITE AT ALL TIMES FOR DRAINAGE INSPECTION. 16. NO PART OF THE DRAINAGE SYSTEM SHAIJ. BE COVERED. CONCEILED, OR PUT INTO USE UNTIL IT HAS BEEN TEM. INSPECTED, AND ACCEPTED BY THE CITY. i7.STEmat. sroIN DRAIN GRATES "DUIAP NO WASTE, DRAINS TO SIREAM* I&CONTRACTOR IS CAUTIONED THAT POTENTIAL CONFLICTS WITH EXISTING UNDERGROUND UTILITIES AND STRUCTURES EXIST PROPOSED CATCH BASIN LOCATIONS ARE PROVIDED BASED ON AVAILABLE INFORMATION AND MAY REQUIRE U14OR AMUSTMENTS. CONTRACTOR SHALL NOTIFY OWNER OF CONFLICTS ENCOUNTERED. DETENTION SYSTEM, CATCH BASM FRAMES, GRATES, MATERIALS AND INSTALLATION METHODS SHALL COMPLY WITH CITY OF EDMONDS DESIGN AND CONSTRUCTION STANDARDS. NIS Storm Drainage Notes 6 TRENCH EDGES MUST BE SAW CUT AND TACKED PRIOR TO FINAL TRENCH PATCH AK. TRENCH PATCH PA( WI 3 'S TA BOTH E�OW) SEE E2 LE 6 2" of 5/8'z CSTG­-�� 4" MIN. DEPTH 1 -1/4' CSBC X 01 BACKFILL MATERIAL X . . . . . . . . . (SEE NOTE BELOW) ............. . . . . . . . . . . . . 0j C) MATERIAL EEDD1N NOTE (SEE BELOW) N 0 1 E: REFER TO ClIf OF EOVONDS MODIFIC-0:JS T�l DIVISION 9 O-_ WSDOT SPECIFICATION'; F��R ROAD, BRIDGL & MUNICIPAL CONSTP-jCT­j TABLE 1: MA>� TRENCH PATCH PA' . WID'] __LRENCH DEPT-] PAY WIDTH V-4' 40" A'- 10' 60" 10'- 20' 72" C I T��'� OF [__[DiV-0[�,�Os STA7L)AFID DI -TAIL TYPICAL TRENCH SECTION GEGCGT 11.1 '1 7124101 1— HIS E4.2 I HIS General NotNe's' 3 COE,STD Detail E4.2 - Typical Trench Section 4 if I RESIDENCE E A. CLEANOUT WITH 45- REND AND CAP C.O. NOT TO EXCEED 100' BWEE�l 1 4,14'x 5" CLEAN OUTS CONCRE E COLLAR CLIANIIT Y1 " I I'KINW T 'A ER) LEVELING COLLAR CONCRET- LEVELIN6 COU AR /1_0�-JNG LAMPHOLE COVER 12 MIN. '-WATER TIGHT CAP RISER rONCRETE PAD 12" PVC SLEEVE A. OR 6. SIDE SEWER� 6" RISER GENERAL CLEANOUT DETAIL 6- WYE AND AS - A n 1/8 B IN 7ENJI 6�'­OTl BLUE 32. A- OR .' SIDE SEWER ASPHALT GUGRF�CE CLEAN OUT DETAIL AT PROPERTY LINE 12" LOCHING LAMPHOLE COVER (EAST JORDAN IRON WORKS CO.) 6- RISER 12" PVC SLEEVE (MODEL 111: 00366108) PVC CAR 'IB'R PWC L CE NOTE, TYPICAL 7CLNOUT UNDER ASPHALT SIDE SEWER JOINTS SHALL BE OR CONCRETE GASKETED :CATY.. I O�F',:.E.D,M 0 NO S STArJDARD DETAIL D "BIG" 6/16/1 L-� SEWER CLEANIOUT DETAILS _11" NTB D GE.CRT 4/2/0 G5 "" 7 COE STD Detail E6.2 - Sewer Clearout Details IN TALL CHECK VALVE ON METER INS7AL BLILGING CONG-TIGH -1. DELETE C-EC- V.- I M�TERS TINST LLFIL WITH REPLACENEN1 C E_ ING 1­1 ..INS i I I Do "L'r- :';',T-LLED I CITY L-1 VALVE '01 JI (T Ej OPERTY LIN� Eel (T 1 1- 1.�­ IC' U-.E: CURB SICP BHA L BE PLACED �1 MARKED 1- IAONTED ER ­-LE1 ON IT, __D N CK _ NO CURB STOP, CC- -ALL BE 16- I.Gli G C ALL G­ .1 1 ­E "�ST­ �­ER 7UBING CEMENT LINED DI BRONIZE C RR VDA CC 1­1 -C 11,17 AID CO-4 (CTSI 5- DUTLET. <FORG OR ­[­ TERMAIN WIT� TIRE - SOF1 ­­ IUR!N� W - 'OLECUL-R �a Y PIPE '16D -1). TITCN TYPE JO:NT TRACER WIRE ­,- 8 ­A­rl ­1 'ARE D I. -D Y PIPE, IRONIC 1111 '.T11 , 1�� EIA 3- 1E7ER SErl ED-L 10 ICONAL3 W TH INDLF BILI ­L11 ­ L­ INL' �-(�K VALVE, 12- IALL II G, 70, INI_ET AM. oull, G­ �O­Gl CGNIGGT­ (D DOUBLE B-A S­� C -ER,11. D ­­ THIN CTEEL MID-STA­ P.1GT:C,-LTCQ GO- I --. tl . 18 1 12, ITH MG U.19 OUCIILE LI (J) BRISS COMPRESSIGN FITTING PAINTED 2 X -' IT-1 ',-TEQ' '­1C LED C, I (=K) V WATER SERVICE TO HOUSE MIPT � CT S G�I- j 5 I'G`Pa" ED TRACER ITAPED N17TE: PVC PIPE SHALL NOT BE USED FC7 VAI[P SERVICES TO LY IPE EVERY 10-) CITY 0F EDMQ�,J.DS:­ STArJDARD DETAIL __" !;.F __ :� G. GGRGR �,i 1 34- and 11- WATER SERVICE INSTALLATION G. GEBERT 1 6111, ,1 BIB D. DESERT 1 4 , P 07 1 COE STD Detail, E7.6 - 3/4" & I" Water Service Installation 8 SoGf�W�98118 A S. P. 20&M.1211 1 206-973J344 N M M enginee(ing pllc p 30766 D usi Dw L 9% A I PER CITY COMMENTS 03131/2011 r I- So* it W, sKak Axorcu,,gi, 0 DID 88 Cl 4-) 0 '2�1 108-10-01 02/14/2011 As Noted BRH of,IK,illf LP DRR,A CHW AW� Up D..W. Grading Drainage, & Utilities Notes & Details C2.1 Nis COE STD Detail E7.7 - Residential Double Check Valve Assembly (DCVA) I JLJ A .Y4 PLAN —1-1 J— Grease Interceptor 5 Ix �GRATE SHALL BE 6' WIDE DUCTILE IRON. TRENCH DRAIN GRATE NEEL PROOF LONGITUDINAL. ADA RATED, NTS PER ZURN ZM6-HP) (ITEM NO. 18) OR APPROVED EQUAL 1 4' MIN. THICKNESS 4- VAIRIES SEE KAN THICKNESS 4' MIN '�TRENCH ORO PER ZURN Z1186 OR SUBGRhDE TO 95% APPROVED EOUAL MODIFIED PROCTOR TRENCH DRAIN SECTION NIS 20* OR SLAB 20' TRENCH DRAIN CATCH BASIN --- PER ZURN 7887-6 (6-X201 OR APPROVED EQUAL SLAB j THICKNESS TRENCH DRAIN CATCH WIN 2 NTS Trench Drain WE INS-L — WE 101 1— —TECTON .1 E.— CONCR-i (20). - -101 GRADE (T.) ='.RE F�Rlc) CONNEC' 11 IIATER zTR _DATE" &-CEW TO FRONT V E c—l', OR 'T. —ERS ELEMR� I IN EON' DRECT BUREN. OR ROD Is- R�Q I— CO.OLIT RER EILE�.- I—' PER- REWRE—S. NOTES: SIDE VIEW PROVIDE On APPROVED SUPPORT FOR DEVICES LARGEO THAN I" DIAMETER. OWNER S . 1 2 HALL FURNISH NSTALL AND MAINTAIN THE RPBA OR RPDA AND ALL PIPING AND APPURTENANCES SHOWN ON THIS PLAN. 3. CITY WILL PROVIDE INSPECTION. INITIAL TEST OF THE RPBA OR RPDA PRIOR T E TABLISHMENT OF WATER SERVICE WILL BE DONE Bf A STATE CERTIFIED BAT TESTER REDUCED PRESSURE BACkFLOW'ASSEMBUES SHALL BE STATE APPROVED DEVICES. 5. ANNUAL TESTING Or RPBA AND RPDA REQUIPED BY OWNER 6. DRAIN SHALL BE SIZED IN ACCORDANCE WITH AWWA CROSS CONNECTION CONTROL FI CURE 6 _8 (SEE SID DETAIL SHEET E 7.11.1) 7. ENCLOSURES SHALL BE LOCATED ON PRIVATE PRO�ERTI. QTY-� -0 F� ED�AONDS STA;JDARD DETAIL 11 —ERT —11T .1-1 AMD RIRDA E7.11 .,s r N's COE STD Detail E7.11 - Hot Box Assembly For RPBA & RPDA 6 BUILANG BLOCK RIVER ROCKS /*BOTTOM OF BIO;=ON POND M (PE S7 =— /— — ONj 11� BID SOIL LA PLAN 00 NOT COMPACT SU13GRADE. SCARP UPPER 3-e PRIOR TO PLACEMENT OF BIORETENTION SOIL MIX V Pt SLOTTED UNDERDRAIN IE PER PLAN 7- 12* MIN. AGGREGATE PROVIDE 0.5"0 ORIFICE ON END OF LINDER-DRAIN PIPE w16' OUTLET PIPE PER PLAN OVERFLOW DRAIN W/ CAST IRON DOMED GRATE. I'M PER PLAN IE 1: SIZE PER PLAN N" Bioretention Pond Section 3 IF CLEANOUT 6 IN CONCRETE PAV MACE. PROVIDE THICKENED EIX & POUR CONCRETE MONOUITHIC CAST RON COVER AND RING 90 `FDCO* FOR TOOK DPANS AND 'SDM" FOR STORM LINES THREADED CAP nNISH GRADE 12'0 DJ. III CONCRETE - nBER JONI 45' BEND - SEE PLAN FOR AND PIPE S12E DIA PER PLAW WYE OR 1/8 I I PAVEL) AFFAS SET FLUSH W/ FI? LANDSCAPE GRADE PLASTIC VALVE 00! W/ 8- DtA LE 2' PEA CAP FABRIC 1/8 BEND -LDIA PER PLAN --�PLUG SI-IALL BE SEND IN SAME MANNER AS MAIN SEWER JOINTS LANDSCAPED AF-AS Has Clemout 4 NON SHRINK -CORE DRILL EXISTING RC PPE DETENTION VAULT 6- SDRI PVC 4 WASHED WAR ROM MANHOLE ADAPTOR 4 DOSTING DETENTON VAULT 4 "s Existing Detention Vault Connection 7 N's River Rock Channel 8 1 X "I Li Sattl�WA,98118 M M 1111 S—A I,* AW S. P. 20025.1211 t 1 .06.973.5344 I engineering pllc J.. 7 RI.- ts, L I PER CITY COMMENTS 03/3112011 1. r I� . PIN SOO. It ft SC* AOX�* ON ON un 48 0 R'*'- 108-10-01 `-- 02/14/2011 Slat As Noted 'dPw BRH LJP ORRR, CHW A-- Up Grading Drainage, & Utilities Notes & Details C2 E SW 1/4, NW 1/4, Section 29, Township 27 N. , Range 4 E. , W.M. -7- ---------- ------------ PAVE)JD4T I RESIOR01 M (TYP) CURB RAMP4Z M-2 - (SIM) 7 i� -1 3bb R=i �z VCONC R., r 9. "V�- j CDC WALKM (!�AsEPKAL? DO C PROPCSED VERTICAL ADA CURB RAMP R=r CURB (ryp) "k R 2' SIGN '00 NOT ADA ST41PING rl 2) Legend Dm R MUTI ji)� R E a, tI PROPERTY LINE R_ 5 ADA SVIJBOL R-i EX CONTOUR (INDEX) SEA L COAT D PVMT .0 EX CONTOUR TO REMA.N I WHED. STOPS 61 Luf 4� PROPOSED SULD64G CONCRETE WALWY CONCRETE PAVEMENT is ASPHALT PAVEMENT PAVEMENT SEAL COAT k 4* WHITE STRSN�G LANDSCAPING R=2' FF 78.0 FINISHED FLOOR DDATION a P HOT ENEIL A Es R=2" LIN A- R=1 ERERGAT'F 10 UNE R=2 LT.. CHECK V", TRENCH DRAIN STORM DRAINAGE PIPE CLEANOUT (SOCO) —DOWNSPOUT EX TREE TO REMAIN N 0 10 20 40 20 Scale T=20' Asphaft Concrete Paving 1. MATERIALS AND WORKMANSHIP SHALL CONFORM TO 2010 WSDOT STANDARD SPECIFICATIONS CONTRACTOR SHALL POSSESS AND BE FAMILIAR WITH THESE STANDARD SPEOFICATIONS 2. PANANG WORK SHALL CONSIST OF NEW ASPHALT CONCRETE PAVEMENT (ACP) AS SHM ON THE APPROVED DRAWINGS 3. ALL EDGES OF EXISTINNG ACP SHALL BE SAWCUT TO PROVIDEE FOR NEAT JOWS WITH NEW ASPHALT OR OTHER SURFACES YMERE HE GRADES MEET EXISTENEG. RDADVED ASPHALT OEM SH" BE DISPOSED OF OFF SITE IN AN APPROVED MANNER. 4. CLASS *HMA J- ASPHALT CONCEETIE PAVEMENT SHALL BE FURNISHED AND PLACED IN CONFORMANCE MM THE MATERIALS METHODS AND TOLERANCES OF THE WSDOT StANDARD SPECIFICATIONS SECTIONS 5-01.1 THROUGH 5-04 3(21) FINAL COMPACTED DEPTH OF ASPHALT CONCRETE PAVEMENT SHALL BE AS SHOWN ON THE APPROVED PLANS. S. APPLY CSS-1 10 ALL VERICAL FACES OF THE EX SAWCUT PAVEMENTS PRIOR 70 INSTALLATION OF NEW PAVEMENT. 6. PRIM KWD(-JOINT TAPE N ACCORDANCE WITH MAINUEFACTURES REQUIREMENTS 10 ALL JOINT& Call 3 Working Days Before � You DIGI '11-800-424-6686 CITY of EDMONDS APPROVED FOR CONSTRUCTION CITY ENGINEERING DIVISION DATE S..d ftt A- S, Sc.11,,WA981111 206.725.1211 106 mmm .973"'44 engineering plIc 30766 L I PER crry COMMENTS 03/31/2011 D 1. 2- It AMDI�* 041% C� m C) cc i, > S4 108-10-01 02/14/2011 As Noted BRH LJP CHW LIP Paving & Striping S— Cr-I 3_. E WM PER PLANS CONC WIN 300D IRS J 4' CRUSHED SURFACING TOP COURS PER WSDOT SID SPEC 9_M.9(3) SUBGRADE COMPACTED TO 95% MAX 12' WIN DEPTH . Conc Walk CL AR SPACE BETWEEN END CE' DONE L TRANSITION POINT FQN SLOPE TO LAND :NG ­H A. T, A YPPI_ \ j � TIA ME EKIE1 1. CIA. CSTEC—LE I—E, P.—PI 4S�Ll_,YEA __ - A A N 0 010 —A- .—SETAT c —ATION DE741L 1, DETAIL B NOTE, 11- SIDEWALKS, CO�STT ILO ATIGIS 1HCRE HE, ".PS 'BUETNET'TS 'END CIDD, W—EES, P—TER STRI WCI .1 EA.RS ID HATCH BIC SuqrICES 2 ALL CONCRETE SLIBIFFADES SNILL HIVE A LIGHT BROO. FINISH 3 C NERETE SIALL K S-EIIED WITH I CLEAR CUR- COWITUND OR S­ BE CE)VERER AND KEPT MINST FOR 72 IOLRS, c L ­CTABLEANDARNING P�TTERNS SIRLEN TED —.1 SHALL BE RES—IT ON ALL PUBLIC STREETS WITH I RD RETURN PRIIA STREET ­ENG FIWE BAE — LOTS. TR.C;IDN GRID 1DIA—EIS1 TG BE USED AS INDICATED ' TO NON-TERSECTICEI CLRB RI-S CEN PRIVITE P-DPERTI TNE STA­RD DIAIRIND PA;tERN III BE SED AS INDICATED IN BETAB_ A. U BEF POLERED SEPARATELY F11 Eall CITY ��F- -EQM0f,JDS. EGI P"slo's STAillOARD DETAIL -M." 1 .;'!. I CIURB RW rfPE 2 ", S, *.—, " , � GERORT 1 0­7 1 A% 7/2-1 """ NTS j"* NTS COE STD Detail E2.15 - CA Ramp Type 2 9 2 - 14 CAST-IN- 4* WIN C TOP COU STO SPEI I P T FOR PAVEMENT RES70RATION PPER CITY OF EDMONDS SID DET E4.2 ap s Conc: Vertical Curb 2 PROVIDE TOPSOIL & PLANIINGS PER PLAN NON -PAVEMENT AREAS ' "s Pavement Restoration 6 Not Used 10 SAIIICUT, TACK COAT AND MATCH EX A94KT FULL 06" EXPANSION J GRADE KIMT V '0.18' LOAD TRANSFER SMOOTH DM BAR FINISHED LAN 9' ENT 0 12' O.C. 14 0 18' O.C. EACH WAY IN� /3 OF SA ED( UNDISTURBED PW SUB -BASE MUST BE COMPACTED TO 95% MAIL DOM PER ASM 01557 3* CLASS V ASPHALT CONCRETE IEVMT 2* CRUSHED SURFACNG TOP COURSE PER WSDOT STO SPEC 9-UX3) COMPACT TO 95% WAX DENSTY 4* CRUSHED SURFACM BASE COUtSE PER WSDOT SID SPEC 9-03.91(3) COMPACT TO 95Z MAX DONSTY 12- (WIN) GRAVEL BORROW AS REOUIROD OR DDSTING SUBGRADE COUPACIED TO M WAX. DENSITY PER ASIM D1557 1. SAWOUT FULL DEPTH WX REV PVW7 ABUTS EXISTING AND APPLY TACK COAT. 2. PLAUE AC IN ACCORDANCE VTH WSDOT APWA SECTION 5-04 3. PROOF ROLL AND REMOVE ANY SOFT SPOTS REPLAa RIUM MATERIAL WITH GRAVEL BORRCEN R TO Pj V,Nr CONTRACTOR 91ALL TEST AND VERFY SUBGRADE VEM MMPACTIDN MOUIREMENTS PRO A WTs Asphalt Conc Paving 3 AUGN CENTER OF WHEOLSTOP MOF PAWNG STAU. cam vangop ON EAM PARKING STAU. WHERE WDICKIED ON PAM PLAN ON SHT C-10 4- WHITE PAINTED STRIPING (W ALL PA"G STALLS) ----------------------- e�,p gV. 111. _31 gir ;1,40, ­ w1w 6* CONCRETE PAVEMENT 4000 PSI -r COMPACTED DEPTH 5/8* MINUS CRUSHED SURFACING TOP CI0JRSE PER VSDO7 STE) SPEC 9-03.9(3) -3- COVPEACTEID WITH 1-1/4' WDIUS CRUSHED SURFACE BASE COURSE PER WSDOT STD SIU 9-03,9(3) - 12- (U�O GRAVEL BORROW AS REQUIRED OR EXISTURG SUBGRADE COMPACTED TO 95% WAX DENSITY PER ASTU D1557 NOTES: RACE CONTRACTION JOINTS AT MAX '0* OC IN BOTH DIRECTIONS ON (IA. IINTRACTION JOINTS SHALL BE MADE By SAW. RASC STR.PS RAM W/ CONCRETE, OR TOOLED INTO CONCRETE DURING PLACEMENT. NTS Cement Concrete Pavement �r mm PKI'm STRIPI PLAN MEW NTS 8 ADA Symbol CRAY RECYCLED PLASTIC WHEEL STOPS FROM BARCO PRODUCM. BELSON OUTDOORS OR AMOVED EQUIV (3) 15 REBAR 0 IC L , wo, F 717-1 PANTED STRIPING SECTION VIEW 12 Paint Striping & Wheelstop Installation ADA Striping 11*111,1111 PE6 A' S, Sumb;111.93119 P. 20025.1211 MMM 206373.S,10 engineering pilc SEE. I PER CITY COMMENTS 03/31/2011. 0 1. r rn!�� T� IPMB, PEA !P:RB if HER saik ftj. WERE. 4_� 0 ct ct as 88 E > "a �J4 111 0 108-10-01 02/1412011 As Noted BRH LJP CHW UP Paving Details SEE. L C3.1 L.J 4�' hY "Y"AR F PiSTURBANCF�—' EY OVERFL6W STRUCTbRE,.,,,""' EX DETENTIO WITHIN VAULT VAULT----� 7, f 1EX LANDSCAPE LANTER 1P E CATCH"YAS X K )R6JEC f" SIT -A' AREAS OF DISTRUBANCE EX BIOFILTRATION V 4, SWALE _k/ Yll" C5 40 J.. EX CA�CH BASIN A /Z /b, Yr� EX FLOW CONTROL STRUCTUR� WITHIN VA (0 2010 LPD Engineering PLLC EXISTING AREAS Pervious Surface 550 SF Impervious Surface 1ZO56 SF Total Area of [Astrubance, 1Z606 SF REFER TO FIGURE 3 FOR THE COMPLETE DOWNSTREAM DRAINAGE COURSE FROM THE SITE N 0 15 3 0 6 0 Scale 19=30' Dicks Drive In 7936 seward park Ave s, Description Febuary 7, 2011 Figure SeaW; WA 98118 p. 206.725.1211 Existing Conditions 1216,171,1344 engineering pIIC 2 E r a 0 -C! 0 0 Cx -0 CL L- BIORETENTION AREA $'ON W W W Nor V to 7 x BUILDING 1,001 TO BIORETENTION 7.7 ... ................. UPSTREAM AREA TRIBUTARY TO SITE TOTAL 15,334 SF A/ 4 jr .4- PROPOSED AREAS Bu&ft Roof Area (MMCATO BY BIORDUMON ARV) Replaced hipervious SLwface (DIRECILY DISCMRGING TO U VAULT) Impervious Surface Pervious Surface Total Area of l3istrubance C 2010 LPD Engineering PLLC 5,086 8F 5,224 SIF 10,310 SIF Z296 SIF 1Z606 SF tl /x 1 0 15 30 60 Scale 1 =30' Dicks Drive In 7936 Seward Park Ave S, Description Febuary 7, 2011 Figure SmWe, WA 98118 p. 206.725.1211 Proposed Con.ditions E 206.973.5344 4 engineering plic www.��eeriug.= I I m .0 0) 0 0 0 Q� 0 W �i LZ J (0 2010 LPD Engineering PLLC 9 V .2 -4 X NEW AND REPLACED TOTAL 4,438 SF lZe. t y N SP I Legend NEW/REPLACED POLLU11ON x j GENERATING IMPERVIOUS SURFACE N 0 15 30 60 Scale 1"=30' Dicks Drive In 7936 sewud pak Ave s, Description Febuary 7, 2011 Figure Seattle, WA 98118 p. 206.725.1211 Pro-Do'sed Conditions E 206.973.5344 x 5 New and Replaced PGIS Areas ineering p11cww.Wm&m-in&com CL CD IN to IN 04 tO 2 a U U) x -t C14 10 '99, �r,_LT v-v,6,rJ\ fi\jj 10 SOO-TIA of 111KIIJ 916 9 6 ( , *6 Ez-x 8"55 OR APPROVED EQUAL %NNH 01; 1 E_ -3 +7, YL to' RIM 355.64 IE 354.44 (6- N) -1 RIM 356.5 IE 354.0--(6- E) EX 8" SS (TOP FOODS). CONDITION OF EX SS LATERAL TO BE VERIFIED BY OWNER. TV LINE AND PROVIDE COPY OF INSPECTION TO THE CITY - PUBLIC WORKS DEPARTMENT FOR APPROVAL CONTACT——, 6 N E_ T CT A PUBLIC WORKS SEWER DIVISION AT 425.771.0235. IE 349.34 (6") 13 LF 6" SS @ 2.00/6 TRASH ENCLOSURE PER ARCH DWGS SHT 2. SURFACE RUNOFF & WASHING WITHIN TRASH ENCLOSURE WIH DRAIN TO SS -GA-20 00''G EPTOR ��612� UON, S,, IN, 6" ID (1YP)__111'�,J/ Sw I //A-ug NW 1/4, Section 29, Township 27 N. , Range 4 E. , W-M- � G AS ) APPROX DEPTH TO POSSIBLE LOCATION FOR SNOHOMISH TOP OF SEWER AT COUNTY PUD TRANSFORMER & VAULT ELEC CROSSING 9.8' '6') COORD W1 SNOHOMISH COUNTY PUD 'TION X GAS .7 ROUTINq,�: SHOWN GAS M4*ex PSE. ------ - - - - - -- -- - - - - BLDG`ROOF DRAINS.- ROUTED ��PIORETE N11ON ARE INTERNALLY-.30- INGLE--DS_ 1) 8D 02, SDCO 12" PONDING - DEPTH `t�43 I I � . APPROX ELE� ROUTING PER ARCH DWGS SHT 7.1 3:1 83IDE SLOPES ROOF -OS--DAYLIGHT TO COORD W/ NOHOMISH - IE 352.18 (6- E) BOTTPM- EL- 354.0 COUNTY Pub TC 356.5 GRADE 107 No TOP OF WS 355.0 T- W 6. 6" SD @ 2.0% MIN TP RrVE� ROCK SID *4, WCO f rC 356.14 -...CHANNF 8 RIM 354.5 E) 352.5 (6 rP 355.64 rc 356.77, rp..-356.27. 51 LF 6" SD 0 2.0% MIN nQAI 811304' NYLOPLAST,10" ROUND DRA IN 0 WBAA�IN, W1 DOMED'., GRATE RIM 355,0 @ 1.5% MIN 7 LF 6" SD IE 35183 S OUT) .3.55- 27 6" SD @ 2.0% MIN IL 35 L-8.13 I�4,�W IN) TP 35537 65 IF 6 -�.SD,�Q 1.5% MIN 17 35 _---CONNECT,,SD TO EX NNECT TO EX SD TC 355.66 DETENTION VAULT lo, VX 87 LF e SS TP 151.19._.__, f,--,,JE 351.20 (6 SD 0. 2.0% RIM 355. !355, f 6 IE 354.3 TC 355.5 -tor 177.,J TP 355.33 EX UNDER RPUND 44 Ar DErLN I lU ULl Jj MAX 3 5.64 /X TC 355.14 TP 354.64 V 6 MATCH W1 EX 355.76 PR ED + 4 BLDG PVMT GRADE & BL UTLINE 4 . I PROVIDE 6" CURB�,,' *8 41 OOF` OVER r6 7TJ35!5 HANG TC 355 79 TO. �i_ TP 355.48'_'­ R�,t % B)OFILTRATION PU U Ex (=�Z' WATER METER PATI ERVICE KL (;LINWIRUG ION,1 i".1 TC 356.57 AR C60b I S' V 1 1 55.46 TP 35&07-*-- 4n' WA Ctillr 2b% I- - - . 1 1. : � I DAPVIKIP RAISE' I FO GRADE (DICKS D*E-IN) IPROVipf SOLID NON ZSTALL (TYP) LATUU I VtK C_ SKID 1POVER ZPEE-T C -3.0 TC 356.0 'C 355.14 TP 355 58 ATCH W/ EA TP 354.14 I , + I % + WA SERVICE PVMT GRADE & V". J 5. 7'�/, + 35.3 PROVIDE 6" CU RB KtrtK IV A 0' WA ESMT 7 1141K <� A> 17014 IRRIGATION LAYOUT LA LO N SIGN (HAGGEN PYL'bN SIGN PER ARCH DWGS LANDSC E Z2- 11' DOUBLE CHECK" /VALVE ASSEMBLY/ LAN S MATCH+ 4 L/".I�RRIGATION LIW (TYP) W/ EX + + PVMT GRADE + + :6N�&f T� 6 ti) C SW.JD PROVIDE 6" CURB EX'1O*ER` POLE 01 b Al CONNECT TO EX 8" WM f- NO, '580 - 9004001 XL J 7 ij EX WA MAIN ESMT (HAGGEN) 71 1 XJI IMM, 11VIOUS SURF ACE CRAWr Line Ty PQ Area (square feet) Non -Regulated 0 Exempt I Regulated Replaced New (Post 1.977) ................. 4 444 4 4 4 4 4 1 + 10,310 0 3. 4. Total Itegulated Impervious Area .10, 310 Mitigation required �f in e_vcess ql'20001!f 5. Total Area Mitigated by Fxisting Stormwater Management Systeni(s) 6. Regulated Area Not Yet Mitigated 7. Area Proposed to be Milligated by Low Impact Development Techniques 8. Area Proposed to be Milligalled 11hrough Conventional SWM Techniques PLEASE NOTE THAT VMM TFENCH FEPAIR AM REPLACM IMPERVKM MWACE IS NOT INCLUDM I � - 0=0 PROPERTY LINE EX CONTOUR (INDEX) .... .. EX CONTOUR PROPOSED BUILDING 'd CONCRETE WALKWAY .......... .......... CONCRETE PAVEMENT ASPHALT PAVEMENT + + + + + LANDSCAPING R= 78.0 FINISHED FLOOR ELEVATION PRESSURE BACKFLOW ,,,,---REDUCED ASSEMBLY IN HOT BOX "*_�WATER SERVICE LINES WATER METER IRRIGATION LINE DOUBLE CHECK VALVE TRENCH DRAIN AREA DRAIN STORM DRAJNAGE PIPE \-CLEANOUT (SDCO) - DOWNSPOUT 230 PROPOSED CONTOUR xxx.x SPOT ELEVATION VERTICAL CURB 0 EX TREE TO REMAIN WS WATER SURFACE LA LANDSCAPE ARCHITECT ARCH ARCHITECT TRENCH NO. OUANVY 8601 1 8602 1 8603 8604 8605 8606 8607 8608 8609 Zo 1 -4 v L IL Call 3 Working Da i�. 0 f o r 0 You D19L CITY of EDMONDS APPROVED FOR CONSTRUCTION MY ENGINEERING DIVISION DATE � 0 1" 2- 11112MMEM 1111us= Two Inches At Full Scale If Not Scale Accordingly I Project Name all 0 MIN R2 r% 0 0 . r-4 U Project No. 108_10_01 Issue Date 02/14/2011 Scae As Noted Designed BFJ1 Checked LJP Drawn CHW Approved LJP Description Gradinr,- 9 Drainage & Utilities 4 2,0 1-] DEVELOPN';';�� IT SERVIi-m, rm'� Sheet I I U r �J j j C200 Electrical Asb ilts CONNECT TO EX 8" SS IE 345.32 (61 SD Ot CB TYPE 1 (Z 88CO 3 RIM 356.5 U2. RIM 356.02 IE 354.0W E) IE 345.9 (6-) SW 1/4, NW 1/4, Section 29, Township 27 N. Range 4 E. 5 W.M. (5) 3" Pipes for secondaries 8D43 cB ZURN 2887-6 CATCH BASIN to switch gear OR APPROVED EQUAL (2) 2 Pipes RIM 355.64 IE 354.44 (6- N) APPROX DEPTH TO POSSIBLE LOCATION FOR SNOHOMISH TOP OF SEWER AT -P ELEC CROSSING 9.8' COUNTY PUD TRANSFORMER & VAULT 9 1� /Z/ C00"ORD W1 SNOHOMISH COUNTY PUD CONNECTION V/--EX GAS EX 8- SS (TOP FOODS). CONDITION OF EX SS APPROX ROUTINGb-SHOWN LATERAL TO BE VERIFIED BY OWNER. TV LINE --RdUTEIJ-L AND PROVIDE COPY OF INSPECTION TO THE CITY:! DRAINS- rUbUU WUKKb UWAKIM11111 rUK ArrKUVAL 6UNIAW PUBLIC WORKS SEWER DIVISION AT 425.771.0235.--------- ',Cb OZ SDW IE 352.18 (6- E) 27 LF 6* SD 0 2.0% MIN TC 356.14 �.64-- 7C 356.77 13 LF 6" SS 0 18.0% TP-35q.2 TRASH ENCLOSURE PER ARCH DWGS SHT 2. SURFACE RUNOFF & WASHING WITHIN TRASH ENCLOSURE WILL DRAIN TO SS GREASE INTERCEPTOR 612-GA 2000 GALLON RIM 355.97 IE 350.99 (6" N) OUT 6- FD (TYP) IE 35t-.24 (67 S) IN 22 If 6* SS 0 X-ING V52i09 19 35 .5946- I T" I OT NO. 590700004001 /U2. RIM 3.1 I E 3 62 APPROX. LOCATION OF, METER C )ORD/W/ PSI tj INTERNALLYM- APPROX ELIE ROUTING PER ARCH DWGS SHT 7.1 3:1 ME SLOPES COORD W/ -�NOHOMISH-�. ---------ROOF-DS-DAYLIGHT-TO-1-- ----------BoTrpm-EL-354. COUNT�YPUb--- GRADELOT NO. TOP 9F WS 355.0 580700094001 RIVE� ROCK 8D 44. 8DW I S INGLE �DS--�--� IGS S T 7 T To_ GH --CHANNfLI!2:� RIM 354.5 < U2 ir %r.,) r, 'i" -E)- 1�13 L J-Box IV 558 51 LF 6* SU V-4.U<0 MIN VEPELOV J-Box OP -,,l ROUND 'D RAII'11111-� IN, W/-DOM ' G TE RIM--355.0 A'A'Y'Ay. =J"'8. /0' LF 6" SD 0 1.5% MIN /tE 351-.'8 " S OUT) E 351 A3 4,IN) 355.77 66 LF 6" SD 0 2.07. MIN U'�>v TP 355.' TC 356.77 355.76 ,CONNtdt,SD TO �E V 356.27 X NNECT TO E)( .1. - / TXC 35 DETENTION VAULT, 48.0± '9 1.9 + 87 LF 6� SS E 351.20 (61 0 8.5% 5536 T 355.38 + VC I + + 4 iM 355 35 IE )6.78 (6") IE 354.3 OT "An'i 4. Y, 355.33 EX UNDER ND 355.76 SSW 2 12:1 MAX 359.46-- DETENnJ0 ULT 4 RIM 355.71 1 SLOPE + 64 4 o + ++4 1E 352.64 4 TC 355.1 V 354.64 + + + + ++. 11 LF 6* SS 0 1.8% + + + + N)SED + + MATCH W/ EX 55.76 .++ 'e PRO ED BLDG .1 - � + NMI GRADE & PrnZ 713 356*82 353.50 t6j UILU UIUNt FF W5.8 + 11 PROVIDE 6" CURR/ OVERHAN # TC UV A A rrn Pprq4zl 1pr 355.76 AU'len nW 3558 G (6m) I � yrz z�,AS8EMBLY IN HOT BOX /I \ A] 4a) 1- WATER mEn TP I I , / 0 V, FD( 1 CIA ENT (DICKS DR1VE-IN) 01 LF 1* f0' WA HAG '/P- + + + + + 7.7.7.' C.' TC 3&5%5.79 1 / / I/ ". IX'' .11 // 355. /-'?/,,,Sign Power 'Kk U% B!*LTRAtOK 7rl TC 356.71 6 1 PA110 E "I �: - * # V 356.2 0 EX 6.71 4 GEIONO, b TC 3�6 5 '.46 4/ Fj; CONDITIft 5 + + 44. RAISE1 TO GkE PROPOSED P ING + NON (1) 3/4" PIPIU PRO14D SOLID STAII SKID '4YOUT PER C-3.0 356.no H W1 TC 355.14 + L-V . . . . bcx TP 354.64 + + 3555. :+ PVMT GRADC'& + + o' D& rt PROVIDE 60 CUI1W ++,+ .7 + + + + + + 35 .6-1 REFER TO [A P TP 3 64 + +++ I TC 3 + F00 IRRIGATION LAYOUT CONNECT TO EX 8n WM TAX LOT NO. 580700004001 IWERVIOUS SURFACE CHART LANDS, IE TP 355.05 N-SIGN LE CHECK' J� PER ARCWDWGS P S ')SEWLY C5 bi! LINE / + C� & -4 MATCH W/ EX PVmT GRADE &---- + + CURB COMN T n1% pl?9W PO PROVIDE 6"/' EX WA MAIN ES (HAGGEN) / (1) 4" Pipe X 0 e r no% /Data/ �k/ V/ Z 41 V !4,7� E 20 0 10 20 40 hip r)9 Scale 1 =20' D/5 Area (square feet) Line Type Non -Regulated 0 Exempt Regulated .......... 2. Replaced 0 10,3109 3. New (Post 1977) + 0 Total Regulated Impervious Area 4. 107310 i Mitigadon regidred if in excess of 200qsf I S. Total Area Mitigated by Existing Stormwater Management System(s) I 6. Regulated Area Not Yet Mitigated 7. Area Proposed to be Mitigated by Low Impact Development Techniques 8. Area Proposed to he Mitigated through Conventional SWM Techniques P h ( 54 TV LOT NO. Legend PROPERTY LINE EX CONTOUR (INDEX) EX CONTOUR PROPOSED BUILDING CONCRETE WALKWAY ............ CONCRETE PAVEMENT ASPHALT PAVEMENT + + + + LANDSCAPING F:I= 78.0 FINISHED FLOOR ELEVA71ON REDUCED PRESSURE BACKFLOW ASSEMBLY IN HOT BOX WATER SERVICE LINES WATER ME1`ER IRRIGATION LINE DOUBLE CHECK VALVE TRENCH DRAIN AREA DRAIN -\\-CLEANOUT STORM DRAINAGE PIPE (SDCO) DOWNSPOUT 230 PROPOSED CONTOUR XXX.X -11X SPOT MATION VERTICAL CURB 0 EX TREE TO REMAIN WS WATER SURFACE LA LANDSCAPE ARCHITECT ARCH ARCHITECT TRENCH DRAIN SCHEDULE 00111TAI a V Call 3 Working Daws Before You D161 1-800-424-5556 CITY of EDMONDS APPROVED FOR CONSTRUCTION � CITY ENGINEEIZING DIVISION DATE I No. Revisions Date PER CrTY COMMENTS 03/31/2011 0 1. 2- sonommm EMENEEM Two Inches At Full Scale If Not Scale Accordingly I Project Name 01 . V" Cd C) Ei C) till 0 V-4 U Project No. 108-10-01 Issue Date 02/14/2011 S 0 esigned BRH Clecled LJP Drawn CHW APProved LJP Description Grading 0 Drainage & Utilities OCT 4 2011 MELOPMENTSERVICES C1 11. CITY OF EUMIONDS f xir wi AW ""A kwo r�A &X4go'FAF & 011 THIN b"mc"9% sy so v/0 "TA.WIM4 NOAMA�L 5"hbPrz silosep mwfum CHIPPED CMDAR. D&RX MU6C" IN 3 SAAJQLIL %X ROOT GAMOL 0#41M.&TSK -e- SURU&P FROM UPPER - �PL641L ON comit. CW HAN04IRMS0 frop Sol LW a PLANTING WitS =-B H R U 5 PLA"Nyl NA ------- ------- NOT V10 -SC^11.90 won PF, 41 fA* -0y Ab- Wn 1 '1 ' 00 a lip LIM p . 40,jg NUM] [xii 1#1101ram"'! MEN IC"RimmurNAIM f4m ME immik k� M NO 104mmumis 4 _11MOV6 win op, I'N "W� $to Ic! 1:0 s 1 011 ri'l I Los V V 1 6" HEDGE REMOVAL REmovE oasTiNG HEDGE FROM ALONG EASTERN AND NORTHERN PROPERtY LINES. GRuI3 OuT - ROOTS, DISPOSE OF DESMS LEGALLY. OFF SITEL. FILL RESULTANT EXCAVA-nONS WITH APPROVED TOPSOIL NX, COMPACTED TO 75% MAXIMUM DRY DENSITY. 2 TREEREMOVAL REMOVE EXISTING OAK TREES FROM -ALONG EASTERN PROPERIY LINE. GRUB OUT ROOTS, DISPOSE OF DEBRIS LEGALLY OFF SM FILL RESULTANT EXCAVATIONS WrITI APPROVEDTOPSOIL MK COMPACTED TO ?5% MAXIMUM DRY OENSITY. 3- 7M PLANTING ACER PLANTANOIDUS "NORWAY MAPIr, 2" CALIPER SALL & BURLAP, NTH 2' DEEP CHIPPED DARK MULCH WITH145 FEET OF TRUNK AS PART OF MAINTENANCE PROGRAM AFTER FIVE YEARV GROWirf"I' LIMB UP CLEAR AB F1NSHGRAM Move -Eco blodks to -new, tree location. Final location- to be U. 4 determined by Owner. < U- > -W tzi F-W %?b E'srm fA 0 ?AIM 'Sir-b-. 100 *bvF W I a -1 4A -7h*6-Uv"fdi'­ NME t606 W� W Atfue *aw. -.A0%'Bu611t .11/4 We, MMAJI WAr- - - 00 410 am dw al V - 3 nA- 1080-.*.. - J `5 8 RREET ILE .9/22" 0 1 -4 2011 CT Al .011y OF EDN,10rqj)s j%C3 - - — ------------ ( Rlff-V,I) NURSEfZY- 4ROWN TKILE f%ume 3 0 diff 0s; c mow m u qr XIF,T9kIN I*HE L-56&090, 0 SlEIQUAA TO aAhL.%V. IRPI!`41 T %Aii- -*�# 1-4. Twa Wj%%$ TH1111164011LO THFku no sacmricv4 op Hose sk? 0ZF-P MEDIUM CHIPPIED C&OALOL BALFIlK j%4U`Iwr.H fN 311 SAUCILK J,X %001T 64,LL Ot4bMS'769., REMOVE 15WRL&P PROM UPPI&R, i/.s cr46Ne op Rop-r BaZu. P"ce ON COVI OF ~40- r-tam%* P6&Nwrlma SOIL. - SCA,;tIFY &U%4%&0fi 4"OLLP . T ?-I "rREE pLAN*rlNc4 NOT TO $CALL rHit4 l50tAkNCHE$ SY 30 1p/0 kF,TAiNlW&^ NORMAL 51-IE DEMP M6.01UM CHIPPED CF.90AR -bj&MK MUt.CH IN 31' IsAtjC-FLR.. ZX ACOT GAbLL 01^H&*I 9f.MblVF. SUFtI.Ah-P PROM UPPER 14 ONI-Y OF MCCM 5411 - ""%.PL44QL ON aoNe or HANlD-FiRmso LZX K001i VAL L scA.Rtray sliaambi3m 46'" MILO 5HRUB PLANTIN4 r4al 'rO SC44.Z 5-r4asIr ew-) I -4b" !vpvc. AIS&R. VC OR16 5600" �JVI-1147 Z NAM 1v w-k-r a. A -M. Wra -MA I.N.TA6 W -m- L. S.w PIE S-. 3C 0 memo r*I ip v Apa 0.0*- 46 "'I t r4 P, 4; . .. .. I � , pav I.., � -1 X. 01 $k I ILI v Ev. Ilk- *K LANOSCAPE NOTES GE NEkAL' 'A mv AT ALL AREAS OUSIDE OF BUILDING FOOTPRI ALL 6' -\N NT, NOT INDICATED AS PAVED, INST 14 TOPSOIL MIX, WITH TOPSOIL WELLS AS REQUIRED FOR TREES AND SHRUBS, c: W�MIdN=iC COMPLETE BIDDER-DE$IGNED AUTOMATIC IRRIGATION SYSTEM, AND PLANTINGS AS X V14=11 gwiveN sthm A I N L.&SS $161 "NIPS — ------ UNION IV,' M . 1pl F. Leo" 1-4A - 4p r.A46V..4!vrvL. Pipe 4 'VI& MAM&L L.=W-1 Ll i 1.1'Ns. 'it LW� FWWr ..I -v %, A** 7, ... . ... ... . ....... ... ..... .. ... . . .... .... FOLLOWS: HEDGE REMOVAL 4L REMOVE EXISTING HEDGE FROM ALONG EASTERN AND NORTHERN PROPERTY LINES, LTANT GRUB OUT ROOTSI DISPOSE OF DEBRIS LEGALLY OFF SITE. FILL RESU EXCAVATIONS WITH APPROVEO TO?S011- MIX. COMPACTED TO 75% MAXIMUM DRY DENSITY. 2 REMOVE EXISTING OAK TREES FROM ALONG EASTERN PROPERTY LINE. GRUB OUT TREE R!EmovAL + 13- ROOTS, DISPOSE OF DEBRIS LEGALLY OFF SITE, FILL RESULTANT EXCAVATIONS WITH APPROVED TOPSOIL MIX, COMPACTED TO 75% MAXIMUM DRY DENSITY, ;L 3 TREE PLANTING CALIPER BALL & BURLAP, WITH 2" DEEP A05R PLANTANOIDUS "NORWAY MAPLE", Z CHIPPF-D BARK MULCH WITHIN 6 FEET OF TRUNK. AS PART OF MAINTENANCE PROGRAM AFTER FIVE YEARS! GROWTH, UMB UP CLEAR TO 6'-(Y'ABOVE ADJACENT 4L FINISH GRADE. 4.3 4 HF-DGF, PLANTING EEP IIII'OTF0 LUYKEN LAURELO FRUNUS LAUROCERASUS, 5 GALLON CAN, WITH 2' D CHIPPED BARK MULCH WITHIN 3 FEET OF STEM, AS PART OF MAINTENANCE PROGRAM AFTER TWO YEARS! GROWTH. TRIM TOPS LEVEL, NOT TO EXCEED HEIGHT OF V-0" ABOVE ADJACENT GRADE; TRIM SIDES TO 1:12 BATTER, NOT TO WEND BEYOND FACE OF ADJACENT CURB, N CANS SPAQED 24" ON CENTERS GROUNDCOVER PLANTING COTONEASTER DAMMERI 'CORAl- BEAUTY EACH WAY, WITH 2" DEEP CHIPPED BARK MULCH BETWEEN PLANTS, 4A PARK)."44 ST&II-LS.a. 17.1; SP/ST46-�.kw SIM 7. 5 IF solo. -r-u" f--*vsFk4k4jL AT W10-rLo 7 RAIN GARDEN PLANTING MIX OF."MARCH MAR[GOLD' CALTHA PALUSTRIS (AT CENTER); 'JAPANESE SWEET FLAG" ACORUS GRAMINEUS (AT SIM SLOPE$): AND 'PLANTAIN LILY" HOSTA GINKO 44, 3z4- CRAIG (AT P5RIMETER), 2-GALLON CAN, WITH 4- RIVER -ROCK COBBLE SURROUNDS, PfLcwtorwj:�.- FAP FILTER FENCE TEMPORARY FILTER FENCF- PER DETAIL, FULLY PROTECT ADJACENT B10FILTER SWALE. RECEIVED AUG-8 2011 DEVELOPMENT SERVICES CTFl- CIjY OF EDMONDS all M uQ to ct iv At Lu -T. j< is 00 ca c) ig < 04 Ilem Lu c-) > A 12� Lm w cc c 0 u- Coo) w 4W —w- I , , .. I " 1� 'A, . 1* . . A . ��. , I '. . " . Y - . -1 . . r, 1� . �. I. 1, " . . �- ; / `% \ I . 1� . I I �"- I ,-"- " -z .................... � ------ � ------ ­­ ........ �-, - ) , ................... 11- ----- - - ----- � .......................... � --- - --------------------- ---­-------------------­-- - .., \ ------- � .................. ----------- %. A . . P. 1. W I , /, .". . . I I , \ � / , , - ..' . � - , . 1"..4:i . .1 1, � 11 1_. . ... . . ill' '­'.:::::::::::::: �� � .... . . :.�.:_-_--_:-_-__,�:�::,��,-,-.,:---------: - . .".,,_ . .... � . � ammum - - " Al I- .. ­ .1 . . + -------.--- --------. ../, 1, .- - ., I ..'.." /,.: ... 0 + + -0 I'v SwTgvz� 1". / -If--,/ - 1, // -­-...::_:::::, - + + - I'.,- A/ . Z + + /./ . _,e.... // 1',-_.. 'Ift, .. r I I . '.. �0` k " / / , . . . . f � -e" I / / ,-:,..- . -14 11 ! 1, , // / . :.,--,:: I , .-, , 4F , , .. 4 1 1 , /./ _. , 4 0 . 4 I / + + . . 4� f . . _ I I11- I ; -v " - / / / . , " , .,., " ": -.,. + + . � . .1 , I . III .. . ,,/ / * 4 4 ' � w. . - 1. . , - I. , . 1. % . i. ./ il i I . " . . . . - I ,,­,,� , 7t _+ �% // i / + + . . I . %1, / /.I / 41/ a . 'r -+ t . ".1. / W / + + . . .4 a : . . .1'r I .I`.,.. " ", j1-1 / " , i- + . . . . . ­ . I . . : .." - I- + + . / , ;/ I .:.. .. ., il / , + + .4 . e . ..-../ // . .. v ,., ­-% .. / .1 + + . . . �� -+ :, - 11V / (r ! + + .4 ** . . . / ..-.:.;. - ,,, , i f / 4 . -1" , , , " " : 11! . / . . / + + + I . A -�'. O'. / �' .. / + + . .. :. -* 4 . .. le / / . <, . .. .. . . A . d'. / , . + + . . � .. . � : / 1? 11 / .1 / + + . i . � . ;.q .m _e_e. '.. .1 " . 4 , .e.. ""I" .. je .. / S. 0 � / � + + . . . 0 .. - ., I * ' 'e. � , �.,., .. . .. . 1� ., . ... �1. / P . . ' . .. . , .. z w / + + + + .11 . . '4' - - , 10 i . .-" �% / 4AM ... _ ---------- � '. 4 ' I 11.e .X"..11 I 11 / / I + + _f - . ..." . .. .4 . 1* I,e / / .> + + �TpAp___.:.__. ------ - - ", . l. / / I/ .11 .w� . . . , l­ 1..�- 4 . . ". - I . _­ / . / , ." v + + . . . . . . I . . . .-el - - I / i I/ � 41i + . . .0 . . . 4 � I., , _t- , . , - / . . . . .. I � .I ­_', / / .� 4e + + 11 . 4% . . . .. I . "" _:l-l", / / . I -, I + + "O -4 - , * . ,._,. � :._1 .1 .1 / 11 . / .. + + . . .. A 4 a .7, , I -..----"-,:, .." / / .. 2 . . . . . .. . / . ,_. . �,_. . / 11 / / I/ ;1 I 44 + + . . . Id I . . I %% e . . A.. . ­_-, ,�' - .1 + + I . V ,� . . . .., / � / .., % + + . . . . . __ " ...,­ , . .. / I . . ' .�. . . .. / / / / . X, ." I %t"v -.41 - ­4 , . I- I. / i I- -.. %, / / / / / /./ . , . �) + + . . I 40' . 4 . . , . . -e-l" / / / � .1 � N. . + + + - - I . . 4 .4 - ' ' 1-6) z , , I-,-- l, . . � . -r-Ar, ,;�__,..� / / .. / / I � - - I , h + + . . . . . . . I '. I . % .0 .. . I . ...'.., - . e . !, .,. / / / * , - - 4-i :.,l, 41 . / .1 / , , '. / , .4 . * , " . / , / I .. 11 . + : 4 ;1 , . - / � / - I/ / / 2 / . , . IX-11 / *,""11-.... / / / i It + + %%*11_� .: ... . ,,_ -1 a / . .. -1 '....., / I 1*__1 / / ', / / I / / . . 'a ...... .., -.-,.I- / / I . ,.... / / / / i .11.1 . + 4- + + 61. , . ,...�.�. i ;;­,..... .. / / , � q + + . I _,X��- ! .,. / / / � 4Z, . . I .1 / / .1 � .,., I . / / - ' / I � + + . / / / '.'...�/ d, / / + + Q r. - - , / "I � / .. i .,.,.,..". i f , , / / / I " � , * - - .,-1_1 w*4 I 7. ..-- / .1 .---,,,A - / / . '. + + & / / . / ....". .i e / / / 4' .,�7 1, _­­ .. / / /; / _. / / + + *7 :1 . I ,, / I . / �, .-. " / /IN 11 + + .� . . "..."11, �' 1, i , / / . / --I �1, ,- / ; 1, . � .. el, ...-ex, . / / / .,, I If ,IV ,.. f / /. / / / _%,/. �� + + x- .11 _".­ fit -ASH . / / . / ,--t-, " _r I- ': -I- " ..".0, � .L_%g-?..,. . , � _." / . 19 ll ,.- ii 11 / / // // 1V .�._�_... '/ ++.++ .. . .",.l.,.-..#....., 'I I / . .... 0 1 / ../ // // e .,.-// + + 10 . . .,­­­'�y--- �. # / / :1 + >0 , ,,, " �- 4 . / !? 17 , ......-, -, �, � * - ....................... � " ., . .. . . . e � I ----- ....... __ ---------- . .: . . , _.. . . 4 I � ... -:. . , "r -n,-y ;?-;�- 40e , : � -,--,.-" , "' � � . ----- ----------_------- ­:­. -, .,�'­-- - .�, .. * , - - I � I , 0e, , .. .:%... '% el^�', ef.,,.�,el .( ./e '� I 11 11 ---------- 1_1"1-__-__.,._ 'p ': .. , I 11 ; �. .. - . ,.--._.,. .. - . .; . I . / ',-I.: '/. ,,;p 1'110.1-�� -� , , _.,_ 11 .. '. ., . I - a ; 5 0 , I I -11 ." . ....". - - �/ Kj.ell V � , , / , .�A*-.V' 0v1'.VvV*0../ " ; I V, I.;. "'"" .. � -, I . 11 " . . I. 1. I'. I ,e d - - , 1". ," .. I ".. . . � 2 11 . .. I'll "I A� , � . /� __.__1__._-.,... - _. ..... I . . _­. I �_,__ "I. . "I ; � ." - "'; ,, - "' % " ; 11 _. -,_.., _ _�, I I I I , j , � .4 / ".. 2, m � : I I I . ., ly -'I-.-- : w . , . ,._ I __,'. 5-4) _:*�ts � ? . I : , _", , " 1 (4 u " * A-(-S--Pgjv . ". -� d, _', � I - .6 WAI Y ............... IT i . . : ., .� ". ,'. �. _, " I V, � ,__ - --------- ------------------ ­­ " -N.10 %_ -m 11 I I,/ I ", ,_,_,,- ." E_ � , ,,, __1 ------------ - - ..F - -A-6-cstas-S --- _QK,_tv1_ ------ � ................ � ---------_----- ; , .? -.1. " , 1, � ..,- : I - . e !�­� 1w � . I I -- --------------------- - � _," .. ! ���'ll,���,���������,�������������,����'I'l���l,����,���������� , I ., I ... ,I ............. " .- : H ,.,. 2.4' W I M L .1 - ------------- � --------- � ------------ __,�_ -------- Im �*_��:rljw 1� d r%".'-L : " d. N.-.1 � � % . , .. / �� I , I " _ . j, p . .1 - . . ` .. , �,, 't - , ; . -1. �- 11" -.1 " I . - - / ! ILIO-11 e �1. . 'i" / �-Iw d. - - L a // I . I 1. , / ! - -.1 K p a N8970 al V r'. -.11'., " - R=50.000 'i ___� ,,,--,Ir "...., " -­11. ._ :-.. � __ I - .. ... , ! ;­ -5 .. .. - . . � � � 4200= ­ - --- ��, -----------_- I .................. ." - � , t . - $ . - ___C=mzm_1 ­­ _­.: ---------- I L=21.7,J I + ­ . ;jjjjjj::::;,�.... �91, 11, - --------- ii4",--�f'." I . .� --, : � 't 2% 9:�,% i "r - , ,.,,.,. ,­ I -t' ­t t + r -ow-1-F.0 alrbF. :5 / ' , V.-.... e. N Ca N %�. . , � _.. . . .I'-- 163-85 ll, % Ts & t , .. - , ,I. '.1 // " � ; I -4- + + A ; : " : --,-. ..._, ­/�_. .,�. ". ­­,­­ 11 / . ; 4z .. ,::.,. I . 1�_,. % .1 . - .L�i I.. fl.: : ! "'. : :,-I'-. // ..... -,.--.- .. 11.�� . , ...-" I / , : I , _r 409-MA11 6*41%\ Y : "I : 11 . . ,.". - p 1: -':, -.-- - A. .,. , �, I . , ... . . .., . / . ,� .1 I , *, : : ­­........ .'L.. I : : . y�( �%_ I � '. . I I'll - . ,-. - - I - I . *11, .11, : -1 F 0 11 + ,+ * , ) / I / - ,; .. . - . . .. � I + I . ,,V - i ,:::.::, . I—% , .1 - � , i .. .. : '�._. .. . '. '. , -, .,,��. e ft,W I ". ! il. i -1: I. _1�m. .... .. , "I -- . ,, : 44t, 1-i . 1. I t I.- , " -1. . , * � Z., �-% % _ � i r� ... . '41 11 � /I _,X, .1, : //: : I ".., ':: , '-.--.- " ., x .. . /t . I." �4 /. I 11 ,::., ­'. � _­ 1­ " . 104 � 11 // : : : ,P:-,. '. , I .. ..., /A 4 . 1+ A pi , : ,./-...�' 11 �, --.. .1, __;".., "I I .- . . � ; . . I /.,r ` �­:... - " __ __ I/ %%- . . ,74 - q44 ly . ."-7-- .1, �.� / . 1. 1. '­ .. , I , - : : "... / .:, I . 161'e a / ., .. " : : I'll . . � o4 ; , R .. k � AF-V, I ; / I . I ././ "" / ­.,'-_,. :; '1� - .. . .1. , ." - I - . : V : -.-, . - ...,* _. -I . ; +.. _AL 11 4 1. A : "I ,/ - '. ­- . 11--, ,� - ?,'. -'\ 1 '4-�'. 11--, A�, .'., / ! I I . , "t " . . ,Y i" : ; . / -:,-. .", % _,,. I ,,, .--- . . . . I , . : 11 � il . "" .;4, --. . * I- , _N * I . I . /: I . . 1%. __.. �% ,,,�. . I _'. /A.V . � , : zut - - .. , " . ­ , . / f : : %1% // // : : : / :`-.. ..xj ,­:.-::,.. "k, ....-, -; %, 1% . "I:,... ­. " 41 .."', � a /! i, I -I..... "I ... . j,".. . " - �r tL � * .1 - ,'9%. / : : . . ,-- V . . / + , // / __� _.... \. . ** - , - I A . :/ I I :-,::-.- %. - 1. . .. � ­';� .11 , � , . 1z . I . : I... . .---:::.. ... -.1 _. �'- � - � - +'141 _� a / : : ,:'­,�/ . I V 441_� _._...., \ '�. / . .1 - 1. -./ A , I . � / / :,",.,-_, . . / V --- >,,, � // `�_..�_ 11. /' 'A, 'Ai*�, � ......... � 9�,q + v I., / : ; : / '---::.:.:. '�*,. .1 It, --,,-. / . . 11 . ..., �, 1� , I , `�', * '' 6�N. ... 01 . . . .� : ; I : : . - __!�. 1�� � / : 1�?/_" I I",..;, I . t : / . y , ... . , * �: , i , � I %­_ 1. � - , A .. . ­ .. : ", . __ V . +,q)V -.jijo ,­ N, ,/. . // / : i : : f . . .­ ,�, - - I q*%," -_. f.? : . . �, _ ., - __.t_ � . , / : ." :.- --*.'4-,. le '1% `,_,_...__1_1 . .", : __:� + _r I : '1411. - /;/I," - �:,.; -, - ": . __. � 1. ,.IT 'r . . . / i / . _�,A� _. . , . 1! , _ : 4. %vk+ ''..'t .+ .+ -1 � . : / li , / _'­..­_,-. '% 11 - .. .r - - . . (9.0 � / . . / . .: ,/,,.­-._,._ , � ., / �_.. . .,�'.. L + ; : I ,.- .. : 0 . , *::"., .. " %�. . w .., .1 4'. 1 � .4 1, / : " , �, i / �,­_ 1�__. / _"', ., .*- ! e : . I .. . - + + *+ / : : `­ L ", ,­..'--,. \ I , �11 ; r, - :.*::..- r 6 . .. ;e /: : 11rz ! .1 Ag "---- ./ / l,' ."r.:. %. \ I "I .. . \ -, _ ."..", lI .... . . 4, , . IV ��__.., :,-.. % " 'I', , -_ ..A :,_...l i , . . -* , 4 ./ : : " - I + �._ ..l"01 / �. .,.,: , I . `�,_% � � i %. , \ - -_ 1, . ; 0� . .� *�_ I -.-: V ; 'l./ .,_... 6 i . - f &� I po'l.,. / .. ­... , . .:.: , . -.1. .e l . � , / . I : � / .1 ! % I � � .1 "'_�'_­ ­"....." ­.- 4 . / : . � ..�� r -. - 11 11 �� . ..... . . � .,:.. .. il�, i % . -I.. I . ., . . ., : I -.4 - I .� �. . -,,�*` .....", A /. ,.-,,--:.-- . - . 1%11A . ", _. ,.Are __4_��;,: . ".,: -.: . I f "I". \ I - : D ,.-- . . ..--,* ,­- & 0 �c A , 0 : . 1A - .. - : I . \ .. ­ /�/ " ..' ./.- %. : lx��, / / / ... . " ..., , .. EV11%&I I .. , / _____ . - : 4 f 4,V Ct � 14 vo � I �V., . . .. I . . ': : : / .­ : f - , - - e 7`1///111 . . / *:, , / __j / .%. i . I , , , , .... - -7 "'40 , .1 ­_ - i 11 "A. ... � = Z / - ,v// .& : / I/ / .­ / , -1� . . V . I , / i / / - ':;::,:. - , -- - - . I I . 7/05ow". _ / /. %�/� / _.", - : i - '-. I I \ , __ - -� * � (5 -p 4 - " . , : : ^ ", .... . / .l " lz��...., - l. . , . , e I � .Ir , .. �11. , . ,.,..l..­ , v w &/ 5 " / : 9$ . : : / .." I i 1.1,/. -:: . li,�,� 1-1. 1%. , K ff 01 :-, / I I () f- . .2, , 1.'. I., . 1;*`­ / - -..: �. .l. . I ­V­ . . / / ­­.- ,_: 11. .. 1?. . � %. & .. .l. , �, 7�- � -, Z. 0/,/%Z, - Z141,111, �Y'! � /, W/vm� .-_,-1:­ : : / .." / . . --- / ..- " 1-1 \ 11. . ma . A , I / - - .: I , % p I-... . I I ,­_./ . .j 1. . ......".- . _el i / : / .1..._... :: _,�. , . 1. " _. / .. / / '... \ :.... . _. CA w m _e, ..."., :/ .1� . / / i , , * " .. V.�A 7// I pr�" I, l. I / k / / / 1�1 1. 'A i =Ed - - ol .11 op Z : � -11 / 8 ... // f 1%. " ..% ,l- I.. , r -, " � � 1? ie i .',, I "I. . *.1 . , I : / / / : / . ..... - ; -� .. * �-11 . �% . =a �- .. ,.,-- .,... ! �, ."",141 4,0111*1"A : /11 I J! � I ., "/ ej ." �, , . ,%� . - : / .... .. .,�� V, I . : I ., ". I , , / .1 , lj . .. *7`%, ... :.. . ,.� .- - lo / .r//V,, . ,�., : : .., I � % . I ... - . . / ��, . : , /j, % : : / .1 . / / I / // ­,� " . .! t. '.. - . . /� ,�, ,/ _,�47 . 11 i // I -,,--.,.. "I. *.O. . ... � �% .." .". , L, I ;0 J. ..., / / __ " (; 'It, i'%1'1j111­;_ I'-- ^% - , , . I 01 . " � 11 .1 - : 'V / 7 // ? ......... ,A. 0 .. e I a " ; ,_ , 'ell, . -- - . I : " // 4.) / / -_ "I a: �� - .."' q ��� "I . . i ..f /L / Y I 1% I . I I li .1 . / �1` __....,..�. 11 . I : 11 to . / .11 L / /'. 11 - - - ..A - . 11 11 , : ; -$TA6411 NA A Fk ... e �'% I % ..--l" .... I /// aw : I / . t.'.14ZONT9410070A..'� - ! 1� I., , . 0 1 , , , , I , : ./ il ..A ., - I . A I - f I , __ - .1 - -1c, - -1 � .� "e... - .--- - .� V. . i ! 1__,.,. - - I ... ... . A-.' . . : :� I .. . / il � �. ' " .A. e 1. . ll. � / : /' . -1, . " It.. - 1, w . ' it 11% ,��­- l'....A ,_ -.*.,. I I ,� , le : / . . 011%) FIXIST. p&v1S"%WT__/1" ­ I I .il // ,,,er ______ I - ... -S , - - /7, 5 a i � \ * L., \ .." I _.. - - .., . , , : �.v /A-,\ 1-5-.111 : i / // .�e I. . .1 I _,_ - " ,, .1 * , . . , Al.k. ON swm%jac,-r, p&r4t,mi.. ,// I . I . :,`..­­...__--- ... .. I ­­*­1.11_.1.. . < 10 Ab 0 1 1-0 ._,.. i 4; -I& ; V .1, e . � � .! " __ '� % 11 / ,.,..,.. - - / -- . . . I " : �/ e . /� . � I . '.1 ..., .1, 11 I . ..�* "-A� / :1 � �111- / .. \ ' .,. ....., 4 : . I 510* : /V ...* /� ." I , ..... ./. .11, ,r I "I w . I "...., -, 11 4 ,:q , . '. . // .. // f �. .. - I -� . __,..,..� ". % .. - // I .1 . . .1 .1. ./ , I 1% .94- ­111-11". I 11 �' " w_ 1� ,- ..�- .1 , . 0 ; : // . . : : !.,' -� /� 11 % .... :.,.../ , -- . . I . " / I ,_1 I,,, - .. ,--­­:,., .. .V/, , ': 1, . . , 11-11 75, _Irel� . J f "" . ,/ e ! .1 A �, � ." - / - - ,d,f, . I . �, . . . ;1 - I i �11 I Z.q I , __ - ---- - : . . : I - , " _111_1z I : /. I I I / I ?.,. ' � .-- I � I . I al � �, " , " ..-,.-.-. - I . . , / .� I.,. �. I ... . , I . I � / ­ , Z �_,- -I' , - , -, . ­q - ' : fl ,�A ­ t . e.", , , "" ".� ,l ,; : -d , . " " - I . . "Ill-.11- .01, I.% I - / ­7 "r " "_ �- I - I , .. , , 5"' A'l I 'V1 ,� - .1 , "' - : I " , . I 1 11 I . IC SURE e 0"- ..­. .l.. / / .. - . : ", - , ,% . RZY . , /` _�- 9 . : :1i ,,. , " .1� I .,.,..; 4%.. I Y __�_-.`- -L . / . _�_ . : .11, j11 .."., " � . I ... e%%�- , , ..A .21 I , I m� z If � . .. �ll .1 . , 'I',.,,, : ." / .A + + I / ..: .". - 't. .. - ; - I .; -, .", . . / " . � f ': . 4 . - -%-,., I : : .. - : !:x e* �., . . � 11 -.-'-.:%_ A. I I ; .., :. I ., . .� ... .,- - I .. , " -- .., l` / . . .,� .q. - .i - S . , :: �. , ,/ . ., . d. - p I ��. ��, ),� � ,( ,1 .... ., ' - .- " " ", .'% I . , I '. ,�' '?.; I , . 11� , - " , . / . . i .,� I ." I _ / , I � I I : lie, ,,, _-1. I .. "/ . ,...., :1 ;L�';' , le. , , ,A, ; 11 __ . ! ­. . ., I / " / , _ . ( , , , :, 1, - ­' - . - 1. 11 d. , �? , " :! /. , � : / 11 / + - . 11 - .", , ." .-,--" ./: ok " #I . � ,I - .. I " / " , . / . / . N A 1� -.P - () � ,­ : I . . / ­, .�� e. -, ,,,4�,,, ; : / .11 , / : , I , . //'..%,'�, / . . .- ..�, .,. ­ . . I /. el', L. I ---.. . A. I ." 1;1 � I , -1o. 14% . - . . 11r.-, .7 11-, . . - '% ,:... I # '.. ., ., . �m ., - , . �. , / 11 ./ /.W .. ..l ..,., I ,:-",�1.1�;),?,:(,;�")Ol�;,��)OI.1'I ..�.,. / :4 . d ' .11. : / , ,." I ,._ �. . . / I e 11 .... .. : / / / ,,, .i + + . � 14N. . -.1 ,01 � _� "' 4 4 .'- q �: 4 m : i ." .. / . --, I., . / , / / "' .11 - : /; , , . PARKING ST ALL / .,- Im �, I 11 +11 , I ; : I / I . I I �11_11. : :/*� �...._ 1. . ou 1�1 6 .. / + + . --l", ..-"-' r f ': f "q .1 .11, . V �, � 4/ / z . V, , Ir / / i � / v ".l� A A / ..'. I I , S ; . P .. .. ,.,.. . -, : - .... A, . . . . f ..,'.. , F/ / � . ..�.,_�' . . . . "? . . 91 *1 . l RR-0 p 0 5 go I I co 14 1$ pok Iva 11 I W 1-1.""; . . : ,4 . / / . � . .. � ­ IV . . . .11 .. " . , , ! . / . . ** _ - " .. . . / .... � ; ! i . i : : . ,, / / i .", / . ­­, ---9- I .. .. m : ! ".., -.,. (TYP) . .:. " j , ) 'A'+ + + ... mini W. . 'j, x i:.� ., . . ­ . . , .. . .%.. / - rf f : / / / / / + + 4 - - - ,;f.-X . a $*fo .. . . ; : 'd "k %. 4 : .1 -� ....- - ...... p f 11 . -".q) y 36 : . . .1 ..., f p, .. ;1 / / 'i ./, / / ..., .- j­ A !!A . p .. 40 r . I ..1. , .. . . � I : / !., - ".. I . e .- " ,_ , � I + + . _` I �A 0 _.*1_1 /. , : , : ". ... � + ­_­ / �. _,_., . , , / le �, / / ; + r ,:._.,---"+'. .'.', I * . / . - , . . e . . / / I , .l ,., . I I - . .... - L_ AN v $ C.& p S_ / I . . '. ,/ , , I / I ., / /, . " . � 41:..q %0 : '. ,_.. . .. I , . / / ">,p -:.... 1. Foot> :$ v VA a. - FA.'1b.r t.-6 J.'T y I .�__! ./ . . . .. , -.11 -A. W T a P. / I.` i .; + , F � "�, - 11 . ... .11 . ,� . , . : ': - ',4- .11, I - / ." . i / r . . ­­' I I . . �_ A/,/�,_. - , I pt - -- I .� 1� f / � , � I : 4:. , : / -, ... f ..- . . / ? .1 ; I / I / I . , ; ___ -r. . ,J " : ./ 1%_0 -, ..- abm"1777 � .11 / .. f ., I ( .11 1 4- ---l". D - $ .0_1.,+.__Ci.-. 0. p F. w �+.. .a 'd . , .� � .. . . 11,14 .. . /I . ... / , '-' , . , ..: : `_ L-04, H � . , I I , / , - /;�,:",-&. I I 1z ` .%. � ., � .? . ; e , . w .l. ..­�, - / .. : ,I.. .. I—- -- / .� . - .. 1. ',� I--,.. ! $ I .A," I . 11 .. ­ '. ; : . .. " , 1. / '. " / . ..., e I r " - ,,, .� , + " -"I-"-"--,", ... �, f , I I . - / I i ,�., 11 . I -m�'/-,;�' - , : .., ,. , " ��m- ­­. , ....._.. j i .1 ..", . ,,­ - : - N,',�/­"_ - ,.�11.-k.-.. . .. / / , i (� + �, ­_­ _­__­_­-­­­­-- --------- ­­ _�.. . "A-.. +-.,... ­.....­­ " ...... ... ­__..._­... .. - .1. 1­ __.­ � ­ . - 7 11 .11, 11 ­%. "I .1 m� . . .� . .� , , e / 1p / / % . ...1-0 I . / : : I . �) . <1 " 0 1 Z� / : 1k �. / , , . � I *:,... "....'-­ , / . - . . . V I - w �/. , . : �111 * � _.. .... ... 11 , : I / . . . + + - .l, . l 1, -.-, '.- a .. ., . ,-� 4�r ". v i . Or 'A�f I - .." , -�, / � " ": , . . ,l.� .,r ., , .., . - '. : il -1 L" -, , . ... , ? / '� I .-I i, . , . I .1. � ., . I" - - . ___.. / 1. : . 16 , , ­4f,11- ", -� . -1 -1. / - e , , / . / ,,, , I .1 . - , ..,t __ " .- .. . 1. ." � -',-..,.. . 11 , . . .P' ­­­­'....� ,:",.. - , :..4 . R_; W� `111� .1*1 '. % / ,. I " "/ , / .." e / ;-.*-:' � + + .- � .., �. - . " ,a : .; I - , / I , I , L.. - . � -- . " 1� : 4 . A.. , : ,. -1 7z . / . . � / f . , , + I + .. - -­P, ,� m 1�1' 11'. -IF . ` I . ,,- . 1� __ " - .� .­ . Y, - , . - " .. / �, I .V I . . / .1 . $ .1 -1 . . + + e, . ­­" 1-1 l.r. _­­­ I - . A_�' / - , v 1; - 4 "I"11-11 I v:', 1�1& 37 .. - . . - - , : . . " �.. // , '. / w ,�. I . -.1.4 - / ;/ ,,­ , . 'i I :�-,;." I . - " ?/ + .. - . , , I" 1. A ,,, , .. ?/ . .. ... I . i ,; " I/ .." I e 1_1% . .. i., .... ..,.:/ % . L 4v 1 % I ... /­ / 91i _/ / I ...: . - i. , , ,.)/ / A .I- ." , : I . . f% A ,0/ . . . .' - , 1� '* -.,- . 'N'I LANDS%imPE. " -1 l " - ,.. ..-- .- ,_._ -.-..-- - .... '­: - I " 49 : , /* I .._..,.%.. / "' �' le .�:" ., . / I .... . .., , - . 11�relllk j� � .. .-- , 1* " / .1, I e..... . �r . �', Il. .. erl I I , � - y , Y"- / / I. . ., ;? . I . 9% / ...... ; I '1� ler .." - , .." .. ., f . . ._­­ll, . V., . . . _.l.. ...... I . . . Z-11 ., " , / ."', I .. I /. , I 111*.. : : if -1 .;T / - . . ;' " . "I I : '­ ... - - - . / . I .11. .1 . I ; ! r- , /I 11 _l "" ... .. . - - - .. i Al . 'd . , - , .. I / , / , .1 / ". , I ". . ,�."-`l 11 ." ft- 0 l. -� - . � -l..: - ...'ll .. ...."ll'.' . . 0) , r I ie � .� . ,.- - "" . le /I _! - I .W ., ... .... ..... - .-..-" - ': l.,_­' ; I I / + .. PLANTERS �� _1 . ... ,__ _.:.`l,_-_A'- I �_ - ltrl � &O 1 9 ;_11 ,; I / . , X.. - - . - I .0.1, 11?k - . ' a . . / - . . '. I / / ., .. .1 I . , . �11:_ I- _­ "' A-----' � , I I ..P.,_� . � aj , , '. / '. / "I . / / - "' �_ �X.l` - ,4 .7,q , : :i� . / I/ . ' I .1 .11, ? ." / -Nw- / ,' . I .., / " 1� I ." / . . ./ ..:, . 'r - t- o ....... l." . '. - la d I .. .. .. ., , . I I I ,� , , " . .. - - .1 .. ".. j . . . . 1. . .4 �. r .. . . . .. , + ., ... , � - I ..­/. � I i I . . I I-- ­- - . , : // I ,j� :.A : , *A., .- � - / e .. / .11 . // , .. . . I'* . . : // I -11, .. ._', / / ". j 11 , .1 /I / ., - - * " . I . " ,,, .;.? /, ,;! I " , I . - 10 - ...., a I : ,.I I d, , " .�. . , , " To � " 11 Z 11 . . . _ll _.-A:,....._. . . . '42) ... * , .10 , � , 6 A _�.... .3.11 "I , - : ... * .,...-' �*�:, I , - , .� 1` m ",;, �, ­ . I '/// Li ,,--,-- ­­ .,. , � Li- I - - ,_'.�, , . " - - ­11-11-111 , �� . 1 �', : . - .� .. .--.... - '. ... i A� ` '.. I I I I/ I .. ..-' .1q ; .." ­" . , .1 , 0 - + I ". . ex, . , . . .� -� _. ._ . , : , .1e : /. / A e i , ,� - " ., _ . / : 4 - , 13 ft- ; / , . .. � I . . 77 ;,, / , / . ;z , ... - _# .. _% - , �� . .?� / I., + + I .X, _ _., .. "" 7%1* �"_ I ff . , . . * . . / . . + . / f �.%.; I , , ., . . , , AV 4, -� . � V I , I " I . I i , �/ .w .% " . + � ., : :// � - ./ .1 .. -1 / / .. . . I . .y . . ­11 . ... .. ?.. .11 . , I ./ .1 , -0 + . ., - . � , -, - 11�� 1� , . //, . '_...y '. 4 /I", . . .11, .. -.1 .1 4 - . . . , . '_ 1. , v I - . . , . /f ­/ 'I.- / ., / ./,�, +/.. i / . ,_ , . . ' . . -1: . . // . . . I I I + ;7 + + ­ ,,-.A ."' - - ­ 1�0 �q . . - , ­ If .. ..... . . ". /I ., I . . O.". . . / , � ."'r".., .11 + e� __ ­ _ %% 4 , -1114e : /� .1 ., - - / .. , / ., / .., / ­1 ".. x. 1. ..y I . . . .,. . . - , , . - .. * :,_.I- IV --:., .. - . , " ..,_,� I?, . . - 1-� . f .. , . ___ l"-l� ", . -A ­ .11, , - . ­ - - , ,� - -111, / - .. 1. I , i / I "I I—— A � I 4e'd4' - //,',' : '�' , - ), I , . I.j .. - . - ". . : . : , , .. , . - , . . + .. I I I " I I , " t , .11, .11, , / .1 / � � / / .1 - %V441% 7/'. .:� A . , / -, � + I - , - .. / .1 if ,,�./+­ I ....l ... . . � . - , i�; - . / ,� / f , " .. . ".111 +1 1%41%lb : , : . __41e "" .. . - , A� ,., " - ." - ; I - / � I 1i . . I .- . - . . .. . T I . . I Q . 4. A; , . : I . � / / � �. 'L," I'; . -- I . . � 1/l/ , . " . / , / , f ,1 / .. .., e , ,�XA , 1. ,;. -'I,",- �. " .,. . .?, .. .. , , I , i. " 1, . r -11 � . X I . . � -_1 + I %-, .1 .11 " Y . , . '. . , ,� ? $ . / / . �, . // . � I?. I, , � .� ,'x . .. A . � , -7 . . ­"11____1* '-.1 . .."', --,*kee .�....,. / . � ,. % .. . �� -.1IV / :�/. -, : � + + + 10 I/ 4 / / 11 " I . - . ?A . . f-r,' 111, qk, . .1 . . V . "i / I V/1 - I + + ­ I%% 'dil, 10 _.,�:�//,: I ; I . , 4 1% . i.,, . . ,.// 17. / / r / r . . . A 3 ­ " a . 1� �% - ;.- ;1 , , // le . I . 9 dIdn", , //, i / e .., .41, 1: - . ", e $ / - . . L" " - _,*�11 -� .� i / k / :. , 10 _>*!�. - '% ., . L/ ; / ; , I i '.. 1%� .. %!IV / i . , .. - , . " ..'m /I 1, // I - ' ' / /' � , ! - .-,, I-, " ... , . . I I / f ,��, i - � --- . . A/ - : .. dr . / I \) � . , 11, I � ./ 11 A .1 �,,. '! '/-, , . ........ I, .! . _ "re , , : N WHEEL STOPS - ; �3 � ' , ,- . ,I -H&I V4 LW I 14 Y'. � , 4..;,.*� " p . � - . / ,.� .� A' ,� " ./ / . .. '.. _. . . 1. .,.,�/ / : i / / ­4 ­ r-1 ,4:hrVj. I C, . . : /Or A . '. .11 . . . . I .." + + -o",%eel. . . _1410� ." . 1\ e .- 4�: 'e. - I , * * / I �� / � . . .1 /. . . -1, I .. . 0 '. . .. / / / . * - : , .,.. 11 / / -, 4. , / I . ... , : "I , +;....-- , 40 ; . I / -,.- - i .d! / il'l ..:i . , ....... , I � . /* / e + . / . � � : ?. i mj . , .; 0% .,� .. ,/ , .� " " , - /f / I . 1, & _11N,11 " (TYP) N ., i . , / ,� / . x , e: " .. /;., , ...."/ � i / ...!:,�p..NS0rAV4.T1.0"., � fma I .. ... I I __ I .0 � ...../ . 11 , / V ., , , .. , / , 11 " : /./ I I a / , . - .� 11 I , 5 N .f .,- , / 1. e al ....'. '.1 .1 / I 1.,,/ / I r .0 -.-;4-.., / .paw ,qwltibl '�, .X3 . . 0 , / ... , / - // / , ft , . I .. I �*__Ik . I . .p. I " - ../ . / / L .11 i . . , /. ., ,­ - , I , / I + -f ,�K ,� I ., // .... // / / I b - , . I - C 11 1. : . .., ____ F _ - / / . I 900 " ,;� ! .1 / / '%�� / .//, : - // .1, I'le a 1� f, ,,,, /* . ? / . ; I I . 1i � . �/ , U L- L - -F-. M 9 G 0 p . gV �20,4 /' .".. .. . f'SP. U, i F. r - ��, "I'Mo I I -1 ."i ., . . : . L � . *�'. / ; I'///,- : / .*1 ­1 ! 1� ., 11 ..;..' � .: .-/I / ... , I mw,p . A "I , 4,1_11111 - " 4b ; , ... - � " fb� 11 .$ 1� e ... .. . . / / + ... . / I / , /.5 -"Z//, . I /:, 11 .11, I 1r.. / , d . d " / � . / �. ":/ i . 44 : .A , � ... /1'p+ 90 Pw....I*. W Ir 1*17.30 - L. F',) ­ . - ,/ : , + + ; : . A - , ./ +11 -1 .� . -p I I / I / . . / , I . i "....... /. / F.. (��/ v � ,� e , -."- . V, - - / / .. 6 A I : .11 �, / + + + " I I / i .� / , f ". .,/� i . . , , . / ,�" .o., 1. I.- / .. / . ,. , , i / ,." .11 11 , / / . ­�-�-. / / / 'A : : i./ , . ""I',, � ',V / .. �.. / i 11 ,w "if � /. .,: , / . 1. .;/ / / . . A , , * ; - ; I 0 "' ; : , �11111 , '-,., I . , " / - . �� / : An / .1 . / - I � . . - / / I / I a & & - / : //? . . I to . + / 11 / .... ,, .A , / .,. / . 4 / . .. .. ./ � v . ?, ... - - L" / . / / / / ; IV If " " / . �- .1 e / 1, / / .. " ./ I ** 1, 11 . . - H / "..... " I . #4 / // .. - r.'r ell1l, - `N/v, - a ;p , / t3; i 0 1 : I � . I .. . + + , , e " .. . . ..�. / - / , " � I I f . . I � - / . . . � 4 ,-'/ � .. / i / : 10N , � le, / " / / / / : , 'e, + . ., / I A, W I . .11, .- : , / - . . / " . .// . ` 47-11d - : /.( -1, I .. . e', '.. , .. 0 '. ,,, I.' , , - -, 11 I . . �11 " Y )O , / " � - 11*� I . - , - -- . e � / ,.-- . > / / -, / / . /11 'e, I 0 I 11 _. 9 1. / : : �; ­". ;I 0 ..... 41*1 ;w , . 4. , 1, . I / / , �_.- / I � I I ' Q%r "? , 00 , - , . , " .� -11 _.pgop - � " .". , . . . / . / / .11 , � 5 az) - .." , . � e / /, "&, .11, . I 1( .�. . I - / 10.1 , + + .� .. 10 .1 . f% .,,/ / CA �_ / / ­­,". , .0 . -11 + ., ; , .", .. .11 / i - .'LJ,. z , r .1 '. ../ . . / I / . -111, */ '' ! .. ".: ,-q / - I z / -_ i + �� , , �e .- '. .-.�., , I 11 . , .. " ."""'I I Z p ? + 1! 1. .� �'.i . 11 "', = _j ., I " - a $ . .11 ? _, / w _111e.0 / -1-11 : : , � V �++ / I e. r __7 + / , / / . . S60. 1-_0 / �� /I ., : :ii .I. 0,11. e . . / / .. . L" .� . - K.VW-.& . -$T026 No IN ,t ;. � / . 1* / . � I , / / I If/ Ly .- *� ;y : - . - - + + . 1* / . . "I, .4, /" - , I - / I / � . r� .11, , . r " / - ,.- 1! I . . I _,"T" 4 / / / It, : /? me . ., 11 -,.� - / , / / �#"`* . / / . /* / , I , ff : . � W Z ea 4 .-P..'A( 6 0+4 S...� -1.p... ,.%'% / Lll+.+ + Ir ,... ;�'. I . � 1`11 .­ / = / / . / : .. I . ! . .. i .; , ; , . , el_ / . . ;% ,. / . S . I .- , %� � - / : ./ .11 _ L4 " , '. '' * ab 0 / . .., � / / / / .� � R I / - + . . .11 - ? / / / / . .11 � . I � 11 e / Nig : "I-,,, , I + + ... . , � A" / e, I �� / � m ". ­i ., , , 1, I , " , , "I / .., / 11 / ""I.-..." 11 / / / / . , <�(j I A � ; - : : /I/ f , ..'-.',,'v / + � ; . , . - I I,. .�, e. - A ". I , I. - - < /+ 1( / . ._;1._..,.. + . 11 -.1 � + .:,;" I I,. -'­.� � . _1 / , ., . ? !. . I / / / / - IN /: � : � : : I f I / , . ., ".. I . .� ." I A / / / . / ... I / : .. ;1'41�1 1 �.; " / " .,. . ., + 1. .. /� - .- 1, - I * .. U- , .... I 1, i + + ._;� . ? I " - . / .1v . / / / 1. / %. elk../ � , , I, / , - � ... '. ,,, 11 . I'll + ,,,,, i 10 !". j I - I / ", " ./. - � / / .... I / / / . / / . I., I 8 Lo / ". -, . : .. i + . ; �i" I .. .1 .1 . I . : LU r / ..,/ / / I .1, / / : . % ,�.. �. _.. / .w . �, , � , . � / "' i " . e �, . , / I . / . . / " , " . .., - '.'., - /_`_.1.,.... I .11 % 14.11 + '. I . . 1(0 � .-,, - / / .- I/ .1 / / . ; I? "Stbo',C) --,o' ! ', " .? . - 11 /,� " ,e i , . ;-' , - * 11'11�1­1111­",�,, / z , , , � ,% . , 0 " / / / �', . � / / i j � i / 11 , : p : : � .. .,-,�, 2 11tof ..,.�. . . / / 1__.. ;�, � .., / . ,'�- / /7 - /­ / , - . � �11 _* .: z / ..... / / / I / I / : : :/ . 10&. .I.L... ... C . ,x�. I - . ... // " / / . . 4 ,�. . -,: , t % .1 I p 1, "", , . , � ..�. "I?- +,*-^!..;' , , " - ."",, 11 //.' . , ,wv///, 010e , " �/�, " u,,�, 1 - w / .1 I : / . i _.., 1. ,/ "I'V1. _. , , ...� / / � / / 'e, . // e .A - / f .. I I : � : / I "I'll, I ... Y . : , f.. ., . .. ! - - 'li . I / . il; / " / , ,%;*,Sz 7* ;, %,;,/O�� ..", ;� / 1�71' ", -.1 *1,41.4 > / / / - / 10 I .�, .. �.. :. . loom I . / : �? .1 :1 / + ,r. "* / � " / / ; -­�, ", / � :,.. "I I/ / " / / / / I ; , a : : . 1. . f / . .1 , ". , . . f., . , . . . . . . . . . . . I x / / . i X : I", , W / "J" - I - . .� .j . ,i ""'', "' / - ,...-..- ` 4 / .. . I ly / 1.,, 1',%, - - . / -- � . . . . . . . . . �""R 11,1,11011mil ,2'N�I't` . .., , � .1 / " '.*-. I ,,":"� I, __­,,�,,ixN"w, ..... . ,,, .1 �,!.., / "'_ , - /r, .'� ' / ,, "��",',-,,,',,��,"""',,,�ll'I'l"Z"I"""""�ll"� - ; Lu , / 1p / 1. i I : : .. r%. - kA111­1m / / " ,,.� . / � I / . '**' I , �� " , .. " , " ,,,� .. I -..%.%, .. ., -. .p ..,.r '' "f/ 1, 115"',11� . , . . ., , ... .. 11 I .,././ ! /. .. /I 11 i / : : I. !�&P;./ '4 IC k. . I / .11, I'll.." , /. . ;/ . p / . /'.."""', ." .-,' , .,. , , ./ / /______ r � I " . ,,, v � / / _1� . / / / : I , . , " , / I " i / .,.. f : ." ,�� : V 11 , , .1 '. , el . . " , �', I A .P I . . -;,, ., i .,. / / . U) ; / / / / _. . / , k�l .? le 4 + if w/ _.. . / / / VMS// % -,-I... -%.; I.> " /�. . .1. . . . . / , .1 - I � / . : : p **% J! : / , " . .. '/ Ae (' . , ., .. I �'. . / ,/ / .. I . . , - - / .? .11 . - . , / I . / i / / / / : ,/ : / .1,11 ,, .. ."V � i �. . /, � / ; I / / ?i / I I / . .1 - 11 p, /­.�.. " , i , / - i . / _.� / . , 1. 4 - z 114 I&I / .1 . /I � + / i . / ,/ AV 43 1 �� i .,.,.. � I I ;, : , : : / .-I + I 0 * V 11 V / 1. " ., �%:­�. f / . . . ,// j " d / / / .j + / f . / Q , 0 I- f Jl� .." .- 1. / , - am a . / ­.... - . , : , **,ft IV :/ . .1. -.1 9.1/ ,,,,-- T VY � / .- ,--,; ... ILI� .A' ., " I./.*,.*X.,... � ., - // i / I ; � : . . . W I/ " .."; / "' . , � / / . IF I I m .... . . , .,.� . -. Y/91 , ; - w , . / , . . /. . /v - , * il � i : . / /, ., � / ! / i i I : .. ""' / � 11 -11 4. , ,� , . i . ..;, r i � . . i : , . -;I �, 1 4 . ., 11 I , / / / / -..%.,, � / / . : 4 : 1;1 -1 / + * .1 w / . . �71 " , 0 1 1 - . . � .� .1 . I I il / / I . / / / f -�. / / I / / I / / "'.1 ' ".. � � A'� /I ­-%-', !.. , C'1�1- CA 0 / _ , f .. / : -i + + ' I ./;(TYP ­­ ..'.. I � ". .� " / .1 , " A -/ / ' . ". . / / I / / f / � / / : / : / ." I., ... . , , .,.... - .. . ."'..". - ; . .'....'.�+.. '?-..- i -! / / : . I 11 I ..... '-.! w " �-. . ,../ / / i / 9 I .4 - ) .'. ;, , , , . . I , f . Nk . . .. - 4 1 / . . : / A' / - . I ' U- .. . '. . . " I., I , . , " , .1 . , . lk � - .1 � "I. f � /.',' I � , *., ": , ,,,,, 1�i j + . / / / .1 / / . , / ,.,.%.. - '; -, � , .1 i Z, 11 * ,.,./ , It . 1119 .. e I , / / /: : / A + + -, -r I I's , . ,�_ t . / : : / / I :1 f . / /.IX ,::,: d ; " . / ;1 ?? 1� . I I . ,:, X -,(/ . . . / / i / � I ,.,.'_ I/ i . � . I �. , . / ."��.. . . / / : / . / . / / . ... I : / ,' . '.. + ca / ;. .1 .-. 4��--.--- . �, .� .. * , , , /I ST/�E FILE � * * . " / � I + , f1l md" " + � . . /.-� . . .. . j ..�: . _ / � '' . / / . / I / / : // .r . 11 . / _� . .F / , e ',%.-"/- ? ! - ­�<-_,. / . / .."..., . / ;, - ­,�` / ,// / I _/ I .L1 11 . 11 : . � ; 11 �: / , / . . / /. I r : " . ... / I %! - / .1 . / . ! Em LIJ .,.,. e / / / I / 11 / ; : . . .... + + / .., / .. .., /<+,. j� ! /. .. /I .*, // / , , I * . � . / I . 1.� .11 I .11 .. " Za.,. .. - I ././ . / � .. ".... / / / ' ( -2 . : : ',,.� , � , �,, .1., ,�. / . M z , ',�//,� - / / i ,./( .* - '-4-r : 1 0. I . .. /1� I 'i : /1*4t� 3 " '. ., / -� -1f - , I J ..%.. �- / : : / . ,_..., / " y � 11 . , I/ , / "�',..,* ,- *, /.,-', . / ! A : _j- - corner Flag_�� + / 11 . . +,.,. i .41,,� f /: : / : . V . I... I .*.,,: .1i . . . / I 'C . i , ,. A"'..; , " , / - , i i I , / / li � / : : I" . _�%__11�1/ . . / e � I -1� . - 1. . DI%�; r , zone,' .. �c I �` ".." / , r L�= _'*�?_-? , . .1 I / � ,I. / . . I/ #r ,�' .1, � / . . / . : ,,. r, ;1 4., � ; , I- " . ... � / . I �, ... � .., i .,. , / .1 . x -1 ". . .. �/* - i / / / : : I/ 1��,�tjr:,,d . A.ctual / / I I .. -� -, , . .,. v I .... - / ': / /11 i / / / / : / ? aplacks . : , / I _.. , ; . / , / ... . ,+;, i / . �, / , __ ._ _ * " . ?, -1 " � . - .. / /11 ..-..- / . ./ . . . . ; J ..'. / / � I / - I 011 -...,.---- ­4-� . � / / 11 ;1 ­ . X . , - " . / / / / / i -/';*r�� .- 1� - 6(1? 0 / . , - /p,i '. .," / L . .'/./ / A : ' - .' +. . . .:' / - RESUB � / L / / i , / �' : Front / : : .11 1: I R= 17.50 .11 * I/ ..' / d J ." ; ' ." . I - (0-f :./ .. r " / ..' . 1! + . � ." . I / / i ­.- /. I / � ..._.. , / , � . / A"'� .. / / 1. i / . +/ ? I . ­'. +. . / /* I/ : f / - - :/ C - " / _... ,_1 , , �� / / 11 , . / . .. .. / . 11 - I , , .0 . / / 1 , / ','--. : / / __� ,(/ ---;--/ : I .. . .,. J ; I 'p" . 11 / ,�''. ,:+ r., ­ // / A(/ I - ._...... / i i / : ,*"... / Sides ­4 " : ), . .X L=8.49' / '.. ,// .. . .I. " / 11 ; , ." I I / . . : f / / I . I 11 .'- ,_..� / ... ., .,! -, 1, ,/. - -/ - - I/ J I :, . . . .1 �< ! , %� / .0 I ", / / i I i ; _-.-A. , ' .1. .,. / I/ e ." $ I/ , , . 1',V 0 2 2011 _._ . I / / / -�4-._,p w ................. , - '.. . - . __ .. .. '.11 v .. "I 1� " I . . . . il / . .., / I A : - . i , .. , / ,., I .. " , / 1. . �, .�, " .1, ,-. , "' - // / , / " : /: : I /,-,*-., i / , : 1-4. -, * : . / %, 'I./. -.. .11 � / / / / /. : / ;� Rear . i / 11 . '.. -) ""' i ... , /. . - . -,. -- . , - .. .,"� / !/ ., I I " f / i f I I / . / , ------- -e i . ,� , ". " dy I/ .., , /,,' . I � I . / / ..%I- / I ... / X2�_ � v I . I . ZO I/ -� V i /..� ...... ; " // _,... ; . / / .I. ". "J ..", .. - BUILDING DEPARFIVIENT I - ,� i, .....�..,. , , ; I - / : . .... , . . . . . / I / . : ; Odier .., / .11 , L_1 i . i / .. ., .� . .. " , � .I., f. -7 ..A... . r - .1 , . . CITY OF EDMONDS , , / / / - . � � / / . ­.. / %. Ar ,/ ,� , . .� / . I . 'i � . , I / �7� �,j .: / / D,ML*t / - -;�., . . ".., � " , . .� ." I I -, , ;i ./ . . , '... ? / I �11 '. . : / :. .11 .... _; I ;� / ....%..�.. ; , / +' .... : :,/ + I _.... w� " + All ,� ...... � "� - IT� . ­ � ... / . . ' "L. d" - . ". ? �. .., - . � -1 11 / - = __L - 7W11 1, ()� " / " I , .1 . ,.;:--.-:.:: . d. " .,;" , . / , . f I � . m W / / : : /. / . . . ." , I , , . . . . - e ., / ,.-, " / . 1. 1, . mp.m . .... . m." - I .......... .d - ;1 i / / , / ?/ 7 A , / * ... - /'-, '. // "_., . ... I , / 11 I I . I'. 1. , , , I/ - ; I / I L? A / . . �� . .. :: . ... . - � I / ., :..' " e .1 I / . 1� I I � / / : I / - .. , . I ,'...'.. . A- , / . . I - . . .Y.., .,I .. _ , " ... '! -1 I I I _: , ;, I'll I '. - /. , / / .., "' '. . . .: ..." : , ./ .. ./ S.E.Po...C.1.141LW..4towti.m,.�w ...I.- / f / A I/ // /' . / . ./ / / ... :1 � S e '. 195� � ! OR; ) -E i *­`__-_... 1�/ - �.::: . .. / . �%. , *., /, .0 : . / .- .0 _ - . ; , / , - A 140 . . .. -*� '! . , . � ,...:// / I . ,;�� .� / -� ..-. ? - , . . t . ._... .'. ' / / / - i / /./ .. I -, ., 4p r 4( -.,/ r .,.. .,.,. . . .1 .1 F_ " � / . , . /.I / ! / / / ,, / % " i.� - , / -, . , .- . -,, ' ; � '. . / : / V '. "/ /-. , . ­.. .." A.� / , (( i '.. f # , �, / ,,V//-',�:,_. , I I � - / . ..."'Z. .1 . / - " , . I . . ­/ .. I / /* .".. . .� 1V .1 . . . . . / , / I . / . / .., ,01 I . .. 1. ��, .1, I I / .y . , / *. . . 41 . C3.1. � � ­% 1� I i I � / - � , - - / ­` ... ! ! : / i j .4/ - . 4( ., Z I . e A . e -, " �. , /� f " ... x , . /I - - / / , x . " ------ Qfkwi $,.'_C1.0. " ; ___ . .. . , , -� .11 e ! �`; - - 1'/ ` .. . ; _­_.., 11 : / , 4 ... I ��// 1.11 / .. . . + , I -, " // -, , / - ,4 ,0 . . : . . i �_... " . / I . I'll $, 0 .�. J / -, / ." , . ., / ">,., , . / - , �'/ / / . / , W ,A / , I . . . - : .'. "..... I? I ,..: '. : ,p: / / .,- , - 11 .../� /I �jn / 1% Y , ,.. ..� . -..r-*--Fk-. CJVVLo.__F..W4!t4ft � ." . / � .. ... j. , I., / '." , I �� , 4/ I I f . - � . -�,,! ; / i ,1., - / "' / / /+,( V . Lr% CA / .., I / � ; . -;, . �: / ,Z , , .'.,..: /: . PARKING SPgES REQ'D .6 Iq - . / tp / I., .. ; -f ,�, .. : - - 14 , // / . � .1 '. .. .. / - / I / M .. +I'. .e .1 � ! '/ : : / , . 1". i . ., . I .'- '/,' I . 1. . .."'. .� �. 11 / / _ io : f 1, ,,�.�/ 1* . I � / .p" ; /. . . . ... " ; - ,../ � I . ! .. .-., d� I : :.1 : . / / ..�;/ 40 V V-N, Z, . . " / - . t � PIL . I - 11 . /: /' , , tj 51f / '�'e' - %I C.A ... / --,. .7 / .;, /.", , 1. :. " ,,/ i r _.. _.-M.P.ACYSIM Is N -Ts._ 4 � �- .'. I / .. - .,... : : . " , I , - .� �_ .. 1, " ; ; ." Ae /I I I '� I-'': ,�i / : . / "I . Q % . . I . . / � _. A , . A-1 - ! . " . ; - . . . f I .- , i ! I" / ; , . , , 'i. . i +. '. . V . , -� , .-' - , I I . , I .// / I . : : '. : . . :- " . X . .11! .,; ,- t . . . . .,.. e , / . .. . r .. . . . j . .. 1. i + , . / � . . . i - _�. .r CO "I - . ,-, �-" - - :� : :/ , , I . v� / ; I -..-. PARKING SPACES PROPOSP, .. .11 ... :to 1+ - X. I .. .1., ,_ 11, / � -� , ...... �- El ON / . � L... I I -.,. . / -=. ., , . , .. ... . / . . . // / 0, : / - �ix . / .,� ,. .. . - .1 . ... P A02k K I N C4 LOT... . �. 1. I ... All - �� r-z ....../ - . ", :1 ; -, 5 .1� 7411 Is .J Z *4 / , , . ,� � .1 -'./ / . . .%, . I . -, . .,. / , .. .1 t -.1 . . " f . � '... f . , : BARRIE)l 'bt'A�t;b . 11 .1 I- . . . I .p / Id - . : . , . . / %.� I Kitt FAKKIN I 6 // . ..I v , 1/1 1. 1 ., / ,,- , . I. / . I 0, I .../ // / / . i . _�. .. %... iL ! / . . . I 1k , 11 . d. " / , . OT _.1­_­...­.­._­.._­ ,. I I . . : I i : : I . I -;, v. ,f , - � - , . , .,. - : -, . . / : / I.. / . � 1, . f /' , I r ­ ­ , ­ '7-'--- i / : . , / /-'- - .. p / / -, - ,.� . - � ;I'? � " x. / \.1 .. I /111. Al / 444, ;/-T ... 11 , , ", 11 '. , 0 .. .1', . %... .1 / - , / " .. il /� .". . , , f - - � "' , I / .,. . // / / - / �m - . 4,;� . : / : . " / 4r. I., / No% * 1. . I- .,.,, (* / 'I .. - . _uw�*_ - I. ­... 1. I ... I I... ­ 1. � ... -..,.%. % 11 .. . 11 ".. . � 6 - -mmummor- " �_ .L / '�­-- 1. / , / , -.11// � .1 . / * ,/ . . // / KF_'w -1 - I I 1::�� . ,� � I . .7 I/ � �r '. /a '..' / . wavemm"Nom"Na" r - / 4, - ".. / . /, . - q - . ft - %, /I-** ,./ V . . 11 , ,., - / I I ;' I A \ /, _e` / � . . - �� _* �p I8 , z t �� w ,!3 1 m � � - ON M r. �w - , - _J 0 m � .1-l' M I Re 0 : 0 0 . . i V. 0 : i 0 b. : � 0 a r of . z 0 j : I a 0 1. *0 I . a! � Z 0 . � 1. : = a I 0 C 7 : : 44 a i r. a , = ; lu 11 i I A .m I I- e) . r 1. � . m w IL to I fA 1-0 a 40 . I* V) . w I : IN . I- In i I . 2 we . r 0) ai � I z a � wl � a . 1. X a OX ; z U6 ; � 0 � ; 1% . W 0 � 4 V. . IC I 'm ; z 0 ; . 1. V) : I 2 I 0 ! . 00 . 0 N : in A . 0 I&I : I. : . . . r . ; p � : . . . p r . . . 3 � � � i i * � -A. . . t � I 0 p . I . r . 6 1 . 1h . � . I . , - I � � : )I ; a : ' L � i � : I i i . . r ! ; I . fa . p IN r 0 . co : L r Im . .4 � . : r 3: . : 0) � 93 i t z . ; 0 ! I . 2 . . a . In r . I . Im : I 0) I � I �_ I . i 3: ! z . � : as I i P. . . to . r .0 *0 � 0 C4 N . ; I . I - "I. 't, * ............... . . � 1. I � 1. ­­ ------------ �, _ � ., I . . . .......... . . :-:.. *.* , : ", *. - , , - -1. .. , ,­� .,.:.-.,,, , * I el ."/ � " -- ----------- ---------------------------------- leZ . 1. . 1. , � - . I 11 . . S ,I , Y, � //S,/" NVI,, , . : , . . - I I �A,v " --�., I,4- / ,f , t -le � I _. - .,," ,: , , . , - 11 '? 11 -1 _ , - " l_,l I I . - ;., ell .1'.. � . . . ; � -,� � ,-, .., , . . . , _...... . . i. ;,. �,. 41 V/1 I 1� / t 11 p I? ,-, I: " -, .1 ­-­ . - " V, � -, 1. �. , . I . % ,,�,, ,,,.Iuv,�.A�� . , ''.. .q,;v �;,�e \1 . a ,/,� A .: ; � � , r .., % '11, I. I al ." "' . ­,-­___,_,,, il a ,e � , ­ I - , ,,-,., � .. . . � 0 . , -, c " ­­ - .. - I I - . - - - - , - - __ - , ..; , " 11 I .� " � e 11, � -1 � .? � . I _..... - - _� , . --..-. - . I I . 1. % 11 . I , w - - ­ ;'. . - - � . , I , . 1�1 11 I " . -, I I . ., % ". -- ,.,;-.- -I.. . � . ,� . . ; . e .. ,.� � . . 1 4 __,1­4 --------------------------- � ---------------_ \. . I. If , / _., - , .................... __ , , . : - / ,� , .­..... I . W 8 -------- -- � ..... __ .......... (p , . : , I / --,...,.; 14 P4 -------- _ ------ _ -------_-------- � , � , I I . ---------------- __ ............ � --- � -------- .. - 11 I I . . . ___` - ..... I... - I . . I I I 1%. I 8 ----- ---- !�-P�$A - Q- -P 9 KYS. WAY ............... - 0 . . . I. .�_,,,.­.. . - I . % . --------- � I . ., � . 6 � ...... %___ . � < . P4 EA w I . . . ..... � --- � -- -------- , I/ I- : . H z : * __ , , - � ­_11-N-0.14 T_m 11 ." I .. � .... 4-6-COMS-S ----- OR I H . .r IV .,`1 m - Al vis I � .� -, .. ; I � ^^�, I , " I ,, ... ;�,�����������,�����:��!�������������,��;'''',,��������������� " --------_------------ ­­_ .. , � . . I, , __.". : � �2 . 11 . � - '_ �- !11 el H w . I r 1. s &�,A I - �, d ---------------- 1-1 --------------------- _ --- I ------------- I _.�.____ i tor _j 9 I . _.. . :� . ,_,��� dT ... .* a I ---_--------------- ­-..-_-_,, ------------ ^"-, � � ,%.... I 11/1'. /'* w I ra L rA . 1. e . N..., / ;? I .T., , � : : I / , .� . - . . ,� 11 . ,., I'll . A . m I . . �! .�- a .1 .. � / , ,. .., _/ I 1* i _5 � I . �- / .1 . ,..,. - . 11 * 11 ;e".", / .*I � - - � - ------- ­ - ; "' R=50. 00' . . I Ile ... :::. . , If, �,,,-,,` i�A, : - , -,- i m I . 94 � __ - , - , p � . H ; ,--.,-�,:::::: .......... 1­ ------ � ------------- ­1. ,_.. . , T ,,L -a N89@10`31 V ,,,.,.-/-/ ' .. ..-.;. ,.. _:J I " . I _. - . I ; " "' H - � . � � . ;,:----. _r . . / "I .,,.,,-' 11 . %. - �, I . I - ;, � I I Lf) . . %. + ____ I pl- . ____-4-_;i.� � - _., -f 1, . /�,- / 11 -0 IV sp�TfLp� .., . __r____l_ I k, ---------- --------- I.: -- �i� -- -- -- -ciZ-2-=--:.-, -�- - - -------- --------- - ------ _', ------------ I , 1. L=21.73 i U). 9 � ,. �,_ I 't �,t ; - 7� #i�� ------- ­ .j=ii:i, -- ------­------- ---- � .` ;, . tc) I / , .... ,��.,�� _� -------- - --- � � : ..".'. - 1� - - � m -96 . � ' ��, ,mw 1166-w-l?", I I (14 �� . - 4 . , I ; I - -1 1-1 - � I , --, I- 0 + + - ...1, 7% c�%)Yl! R-, E 13 :$%roe 5 -r -V 0 NON rj�...___ .,�. , . 11 � I .I/ /,.­� . 7 . t t - .1., 163.850 rm s a Ab , .-...,- ., . _.. 1. .­ e ,�/ .t_.�I " + __t� + + . ., - I ". ... ­­ i . 1 � // .. - I ,­. � // ", z + + ,­ �_ .., , /�_. %. � ..,.. I /f ..:, + + � + ��� , -- . I'll .. I A/ . . , :.:" ­ . .e . � .e... .:,-. �0_ j, i � ­� .1 // -.,-. .1. .,.. ,f .p � � : . I I I -1 .1. _%,� .,.. I i .1. . . I/ -",-^, I . �,.. t -, / / I , ,­.. _r + _,LAV , f . : ." I - I 1. . .. ?, a� � f� I .. : ,., ` �,, . . � � I , // : I A : I .,./ � . - -,a- . .. ; E . - - I., . 11 / . , , : � " : I : '!I'. , I - :"-.::: 1, 1% I ,�-. ....- � -/� ! . I / " // / .,.I- . AQ) , _., -+ *7 . /. / . � I I �.., , :. ______-_.-_ .. I_ ! /." .--. , �, / . .� t; A7 11 / ..__�. , 4 � : ". � .. - "7., .0 0 ,,, I _. . 7 1, . I ,� li � . ... , -,:, I'll',,'. , - __ I a a If/ , ;/ .,,.---:.,--- Ot �.� vow-k-, "I., , -,.... /. : -"::. -----. ` , I ,:.., 4t � . I s .; ". . ... / + + I *-NN I : ill % ..'.- .- I . . *1 11 I 1 :_ �,, , li.. z, ... 111. // : : : . - . . .. ...... � .51 1 V. I 11. - .... ­ :,". I � , / r�.. il i . � - . 1. ')," . . I / 40 , �_ � � i , ,l ,,� / , ,�,­, I_ .// � ..,.. , , 11 - / ! " X : //: : I . . ` ".. + + . . .,.,, ., ., I . 1� . -, . ; I 4- -+ --(.,. , 41 , . \ / .` :I--. ." "I. ,.� . % it . - . , ,j 4 , -;: ,,,w,.-.,--,_ , , -,-, .1 ; I , I �. I . � - � ­1 . 1+ / : ". , ._ ,.. 11 z i , / I a lk i I . � / I `_ '­ I 1. / I . j . I . ­ _0 . �, . , ,"­­, It _+ _... _,� - . ^.,. -.- ". I /;,�- I, - ,�,,,_, 11. 's 4 t, 4 8 �)'f i 0 2 � 4 , � , I - A' . . I I i 1, / : I I.*. /./ ­­ , �,% ,0 // i . . - .... ,4 1 q4 - , . I . : : : / � / , , -;.,- - - , I .. ':. 1. � � . . I ^.w ; - I ­,_r, ,%..., .., . . *11 1A � . ,.. . + + . 11 I, / I I'll // . --;Z:.. . .x I',.*- _.., I/ .. . I',- - 11 - L .. . + 4 t + .,L 4t .. � . AFVR I ; 111. : V : / . . ,�, �,- - ,��,. 1 6 - � I I. / p / � + + .4 . . . I .1. ., - . ) 9 I / : ! . /� / w � .10 . .. I -.,e,.. - - A I / � : 1. 1. I / . / . .. - . ,..,.__... . - / . *a � I . . If ;/ 7 ' il : : - - -. .. ­. % � 4-r, I Z a ; , , % " I . / . . .0 . . . ,., + , . - #v . � : I'll . : .f. - ;;,� " -- 1%. . % � - .2., +;, , I � I . ; / // / I i .1-1. .."'i -.. -. I .. � / + + . ... 71- ,-r � � I'll . : .. ... -.-- " 1� -^,-. , , - ? I. - I...,......:% .-' / I/ / " .1 + + . . .1. + -t * 4- ., . - #,v j � / : : I IL ,I- -1 _....__ . I -; %. 11.1. � L;lf i 0 0 i .":V I // t I " + + . / P / i ,�-:::: _: . ­ , � 1. / . . . . %-,#q . IQ Y * , ,all, Ill / : : ,� " /� / Z : . --.­_.,.,--, i " .,,:,, % _,.__.. , ".. .p %i-l-, . .. �_,";; i 1. *0 ; . 1. ... . . . , : I`-. . I.- , .11, : I / .. I - i . / ,--.::-.�-_,:,./ r - -,. ,.%. : ,::.-.,./ ,� .., ..; " ­� ­�._,._. \ .., ,�p . - - .2 i I ,,IV;. ! a ! le , : , t 4,6 , ­ I . , ./ 4 ! ) / : __ / I . . / : .:- - /I . . I / : I . . . . 1. . .......... ; ic I . I I . . NV * + v 11, � I . / // ..:".. ,�%_. . . i,. . ,?- - , , , / + + + + + . . . ,,'.'., 4r. i . iq . �,,,� ,4_11. �11. I t I . �,, - . A , . t / t I: I I : .� . %__ �-,.. _. / �� I I ,),,;. X 0 . . I . . . - . .. ­ do f / 1%. ,z � * ; �,t,/ b. . . . I . .. . -1. .. .. . : / I - I ; ,� :,. - Al. e . I / + + F e . , .. -N% -- -- * . 11 / : I / .. - -.. .1, : , � . . If + + . . , + * .c, Z � . . 0� .. , : --­­:-"';". I,-,,,- ,I_ / I.! .1 / / + , . i . � / . .." .,4 .. . 0-% W. 'T "r + / : : li . / .. . :. : -�:: - I J : , : �11 v A . .".- .., / . 4&rjA . e��. 00� A , . _­- , -,::.. -� / .11 . I . - .. 4 + 4#\', R , ... ,I.: / / : . i � 4111. ". ," 1. -tl - - .- m a � : .1 / 4% + + . 1. . :.ql .-.A,.. - ,"I. � , , : � / / ;. "I T \ ^­­__­'.­_,­ .1 �, ,��-. . ... I i i _., W44k * .+ -4 . ld i i", i I -I. li - : . mc " .1 " a 4 .;. - .�, ., .. + 'r I 0 1 1 . . .. -- , . . �111 �._ ; 11 . 111% .. I - I / .� m / i", . ­ . - ; / - ..: "ef... I I.. � .. : I 4c a . . , , - , . .� I I . � .1 � I + + ..-.------' _,.,�--.,,, ­�- ` I i : . / . : �lIx".1'...'.4 .1 / . %� . w , , I /1 ; Y , . I., I . " I � . . . A I... . .. / : I., : ­_ . e ,� / ,. . . I . . . . " . - . + .. 8 / L -� I. , ­* ll�^,. . ,_ . 3: ! f. I + + .. . . ,p .. .1 � + + 41 ;e / : : I - / I / - - ., % I I I - . , I ;, .. . . ''A, :.__-___­,`.. .-..,, -..'-,,*, :.,.. :... 115r, :-,� -., � 1% \ .. � :/ .� ... . : li .-/ I . , ,-,-,%- .. . , . - ; ! I . .. �� -4 A% 6 I : : . �----,_ : / - .. . -11, . !: I I I . ­ I ,� ------ ,4 - ... . I . f+,�I.-I �. I . w / / , �% - - I ­ ­ ,�-- ..... _,..e.__: , & . . . 1. # i : v . 1. ,1�1_ 111) �. % " 1 lu ; ! / I / + + -..I, . .,, . ,:-,. 11 , .- ­. � "' . / I + + . . _�� ..� .,. . : I jr . . - ;I." / / .. Q . -.,.,-" 0_ - ... . I/ : " / --. ., ; .. _.- / ! . + + - . 14 ' _e - I ,.,--- . , � . - I*" f -,...:%. . . ,. A jg ; 2. � -/. / ,%,-_-l­,_ , . . % / / -j - - ---- ­_,,4­_.. , . - -,.- ­_ , / : .. / - -.,,.. I f� . .", ..., / - I :) - a i / I � qr + + . . I .. . , ", . :...". a / I ,,.,,..-.��, - . ; ,,­11 11 -..,.. I", I . , .- i I IV . . - / . . . ­4�?pll e .- .. ,�_�/_,-,- \ , Q,v a 7/",/" / . 1, 11. , I I : I � . __ - . & t , dr : %� ... - ., I IN - , / / . . . _.,�, .. . ", . - c I.- ./.. ... �,� . . .. I \ I . , . ,a � .,.l, ...... .... t . � . ;- �; . / .--. / , -, %.. \ 1, � % I ,-� . � . I --.j .. I ig - f . . / . .. _ 1. ""' , "I . . I . 2e, I / I - / "-:--: 11 , '. � . . , .- ! �_ : . . . , � . . 'y 9 pp-0.0"'Oe -.--4��111, �/Xz/`%/,`J*`� � -_�_y : el , ; ,.­..� - .-.., . I I., , . A / / 1/ � + + : . - .0 . .. . I- j - _. .... A . . : : . ­­-. / 4 / ^, . 11 - * / . , , � .. " . / . - . . .� 1! ", ._� - �� , -*- - - : - / i / . ,,� � ul - . � '.1.1 ,., 71,,/,-',,,. 1A .//j .0 / i / / + + I . . ..� . . . . .. I -XI - ,.l. .,,. " V / -1 . . �,. I . / . 4% _.,e..��,, / A!-l" """ 9 114 � �x I :-,,.... ,�- �. . I? / , / . . .%/ . / d ,v .4 . I I � " . . , / . / ,� 'I, ,% 06 I .. .." + + . .---`:._...�- -,.. .,. , , f4l�ftiv,l ,. $ ,:MV - . : - P" I I .. / ,". \. : = 0 i . / / / e + + . . A 4 -e , . _x" / -, - . e,t;,,�,, " I ,- .: / i 9 ..:, I / / I i. 4;�`11--, ,..'... /."... \ . a : .. . Id .. ,,e ."I.. I : . / / f d. . .. . . � _ . 14%. & ...." . Z A 5.9&9,__.. , . � / . , . : / �f / 17-1--., ..,:.. bm 0 1 -t- + . .. A - ­ i -,..* : : / / / ­,�,-, ! \ 1�1 ....,.,.... . � 1 v- ca / � 1* �� "' /�,%/ ­-4/00V ,%w 7, j . ____ . #A w . / .1 I . . . . .1 . . .. _1 / ,'.,7,., " lrl,el-, j / \ 4%.1, . / I I . . . . . / 4m .:.......... /'C'o " A4 ,? /,-, - \ / / ./ . . -0 %% . . -- , , _ / ,-�;-, ! . I ::/ .�, / / , %. ".... i / .#P,�, -.1 : / _! .. q a 40 � --.-­.,.�..,.... 1� - ; / / . ;A ` q , . __�_ - / *%l, .,...O." . , ;� Te � � .., I a -i // I '01 . .., . 11 , ; end 0 in � . . 11 . / . . I + + . . . . . . . . 4 --- . ,� 7 : I I / / I \ \ , . . , : / / / i / .. ,�V EWA I-_ . I / / "i � + + ' �,- �,,,,. ".. , Il. - // I \ .. *l. �11 -1 .... / , ,., . . "' . I '... ... *.., . & " : �, , . I I / - ' -, :.,.,. / / Irl � � .--.. . - - ' � / ; . . .. I .!.'. -, � y /d//, & gr W, ,_ ,/., /I " + + . . ...l., ,!�/ ' 14 -* - -.4 . P &46011!_!,� //1';/79 �-' V1. : ' A +1 :�, . .,/ . . / i - , - 4 I I � . . I I. 17 ,,z 0 . "p. . , 1. : / p / . ./ .� I .� " % , ,., w I : / 11 . �, I % . / .*l, /. f // ­,� -1 , ,,,, � � N I + _x . / � , I* I / / 11 .1 1. . .v . .. . . . -7. A . . . . . -.P � ­�` . W/ A - W: p I , : :1 , i / --.-, . ". "I I41Pl,,,P,,_,;:,e, i I- I , / , 1� 1;0 11 ..., // !­ : .. ;,,-;"// /� : , up -/-...,. / / � + + . . . . . . -�- e ,,..� ft z M, , . , : v / / ? // , / _.- ., I., . (./ ", I- �, I . / . ,�, - / I, / . . I I . ,!%/ ; � " ` I - .., 10 / / I , . W 4. . _e�, A 7 / ZE /% " / b . _ __ .., / ./ P, : 1% "' , . / .///,o // , , �//,�! /,/ 4") / C,­ m - -1 + _r . .. 11 . __ - �,, 14 ... : *V i ... / / / .. . , . - , �. � .. < ---- ... . : / ,7 / 11 // I , ; I 1� 01 - ,& � Y ; i / .1 -,, / + + 0 .,d , : , . 4' - � - _...... - :�,//.,l Ill\ O� jo . . .11 t 11 , �, i � / i / / / / .I. ? . ;q . . .....'. _.., 1, . ,0 � /� ,/ I -, ... , 1� I,- i ,-..,. 4 .. ,­ : : I / . pk , ,. � / / i / / 2 / . . . . � _.. I 10 I . I . -$T&41 Ng' L4 1, ... ,. % , ; 0 / P, . + + + I .. � 4 . 7' / - - ,,�, -, ---- / .. " - � -C 0 N T 94-07raw.�_ .. - / i , ___ .. �- . 0 - i -.1 e. ./ . 11 . ..M, - : Id 1v : , 1; __ 1, I "' i / . / / / 4 + + : . ... , - # _....., , - - I .-..--.-- qQVI, . el : :., ..,4^ t�,.i: ) i I � .- � - . �. I z a / ! _,..... . I .­" h . , .....�_ . :/ . . . . I 1. 1. I " � 11 / / / .1 . :,.I' `0 , li � : le il i -1 "' � - . I + + 4 ,s_­i, .. ...... .,.--...,. / : . . 0114 exts"r, P&V+tsm.F / A, .., /1, 1. ,� . a ; / . j 11 q. : , .. ..., - . ,._., _,...., I 4% . . j : 41 : . / . ..w r-. _/�1111_ I -_ - I I ­41 / + .1 "I % . w , -� I / __.. / / / / . . .. . / --,,,: g!5 it ., .-.#' . 14g : / .-� I 11 -l-, I \ I P. X / . . I + + Ok _�..�.e� - /I- . il . __ 1. � ; ?".. .. / / r . I . a:.. I I - ,,.,.�. .,., I .. , le.*11. I 1/1, .1 - 1. . / f ..� .". / / / le / + + . . I . lb .�,:,.., "....­.­ .. 11 .. .% ... -IrIlk",� : I/ I' al."', Al,�. or4 swmjr&4T vp^ 4 t. a %.a /:./ .. I, ." .,�... I.." �. : < )4 i / / .. 1, 11 � . -- c % I a / + + a, . I .1. - � . . I I � . // /I . .! .,. , , ,� 11 z ; I e', . . . . -1 \ � I .. - - I I �lez : 0 I . / / / / /.I',-..- i .1/ / 4z 4) / . 0 41 - --.-,., . - - -'.,:.,: - / 150 51'.** IV el // .1 / � '......., , . . I / / "i_.. 11 � / / + + . , ­�: -'�-'-'"­--.. 4 - : I .11, : .11 / I .1 . .. I ,. � � / . ,/ , . I I 0 * . . + 11 " .� .. - - .. - 4. 1* � : // .A' il I � ____ .. , ; � ; : �/ // I "".... 1. �� N . . . . . // 11 1. I ... . ; 0) i / / / . - ... + + , � Il- ... _.... .. 11 1. . I _,,,,l,,ll,___, . -� . % If " ; ... i � / / .... . 4�, ,. ..., / / / _... I / . / .: .1 .,.,,.,- � -,�,-, 0.4 ­ . - ..... _' , -.e- - . . 40 .11 :! I ..", . - . ^ :-7.-A 0 / I _.. i . + + # �e- I - .i . fi ! .- s I/ .? ,-I -, -, "', -r . ,�7 .,. I .­' ..... I..".. </I - , I : , , � -, 04 I / / / / ..... / / + + - A � :%, . I - f _, . - .,dp, ., 1101.0 .T : " / � / , . tl,*ll\ .- ... .,�e-�,,� . /:, , ,: . . . A/ . . 4 , ; -, .1 . I -,.- ` I : I I : ,4*1_11.11 . : i w - . � . %."," I I , , - , , I ... 3: ; / , / ;"-.-. " / + + .: ..... �,; C', . Z I . . / 11 ,? !11.11 . _ , .".".. I / . IV " 0 it ....... . . , : " � .w . 1% .� 1. / . . I / ./ I/ / / I + + . le I ­ I - - . � . � ". ,/--,� 1 IN / : / I I ASIJ . �­ .# . - . rm . 1-4" / . , ..:.,24 . .141, : !.,( ", V... I I I/ .!. . / / - f . + + ) . - . .. I - - . , I . -1141# : : 1, ., ", .. _� .�­� z 0 . I / / : 9 I 11 .,. - / : - I . I- .. �4 A .1 I ..... ,,;..�, � - ...- . .1 9 : . 1 1411, . :,�;?..., '.. Re. ,.., ­,­,-i-,.., 1. V) p . I lil�.,. I . . . .1. : :lj ,. _..�-.., �, % ." . .� ..�.�,) . . I/ e', / ... 11 � ". ". %, I , / / . '.... .111, : . ., - H'/,. . c Su 7 " .X. 14.11 ,�/ __ .. / / / : + + . RE /Orl I . 1. I d.( Id , . . -111-11-11 A - .� I ! -�,, .., / . + . . - I _.� .. . , . ; / I/ / / . _. / . ..-.#- I .1 ... .."', -p . 2 , .�,,, , . '. '%,. . .1 . . . . .. .,/ -,. / . fu - ,., I I - -----":*. i - ­1111, + + f -,:.. ��._ , ... 0 1 / / / . -11. + + . . �.. . �' 4 - ; I" - . .. � / ... / .. .., 0 .. I . : . '1.% . / "., I I , - ; . , .� ,- ., 0 I . f / / ­,", �, �� ��. . 1.4 �A,.,. / .., -, / ..' :.,,. 0 - .Y.;,- 1, , . . . .0* - ,j - . , - - .- %.- " ` . . . , i . , - . ., I - .1 / , . ;, ",", .., P,� 0) ,N i / .11 / P, 7 + + ..A , ... . : %, . --,-., � .?�,, ,_ ­." : :.Ii.., ...-:. -1. . - . . ,. e / / / ;L.'." I . . / 10* / I 11 -, .1 / , .1 ..-,. I : -� - I .. ,c. , 11 �l . / I . ,A' . + )00 .�-,, _X� Xr- - - - :1 .. . + 1. ..-:-,: ... _ in .8 ; . -,� 1�11,/sll, � 0 I"' �, 1".... :., . . : .f/ . . .. � . .. *, , , I / . . , I I I I ; 0 . 1� / -.. . -,, . , i ., -, e,f�.,,.,, � f ; * .1 I - � , / I . / . /? / .w . ­ ,e- , , / � /; I .._ I , 1� I I 0 W I � . f / / + N V, , vo I � . .. :. . . 0 . :ell % I - 1. .. 4 ." , i,.,,.,. 11, .1 : .i . . "� -A , / :4 : /,W - I I .. il, .1 , I , ` ., 1. .. ! - (. . .�.., , - 4��_,_._,*_�,_�, - . . . 6 _,_., :_ - '..", I ./ / I 11 . - .., If . . : .. I i / _,; ..." ... "I , . ;. 11 , . .. . . � � , . , - 4, I - , . 1. ") I A . / .�/ 1� A2 % ! / 11 , /. . '_ I 1�0 I - :."-..,-,- j, �?, . -, /I .*� .. ., .A"' ..... v 0. '... . 10 / / " ., . + . . ..,. . . 4 : I .�..,. . PARKING S'r & LL f .. I . I I/ . ­­;r, ... 1, IQ - - .. 47, 1// "' i , ; ; + + . I . . -,' a; lAn I .. . /. I . / . . .. / . .... � .., " . . , / -1 . �vl / .. ,� / . , � / / - _.., . V 0 + 11 .-."... .., ; .1 i / / .�_...a, . .... , , . - i : : - . - - - . . , /. 11 .1 r -�,,, " .� / , I f . i e / , ... I . _1 .1 ,7 , . - v ". ." i. I , ,q _-...- - ;:.. . . ,. � + + p . . e.�, ,p-R-0 p 0 O.. . I c 14 5 0 rk 1.1v d 11 I w _...., � / . ; . . . I I � ,� 11 / ... , if / , i /, i � - , ll� (lyp) � , . ).. � I I/ I + + . .. .1'. r. .e. .", : i. _. + + + I- " $ /, i _.. " i � / . 11 14' " - �_, 1� + � / ,,� V " .. .. .. / I - ... - - / , .. + : / .... . - ., I I I I . , , ,11�. f:.-* ' .- .., r � � ...- � .1 r. . I ,e . : : A . ,ak , 4 . . + . I " " /. � : I i I / + I 4j ... I-- .,�..^, --i-, _­. $TO ok 0. . .. r. . . . , : /I., .. . - ..", 40 /� x . ., I . .11 � / ,e 1; : / / . ..". e I / :- I ,.-.. I � ...... ,., , , . .. / + + . .. 1. � � �,, : 1. � :/f. .. + / ,. f / , ! ... .. I � .0 - 171� I"_ �N D. $ 4o,44 -P.S.- il- , / .1 I / j . m / / + . l .. - .�. . , , . ./ ... - 1� .I -.. . f . / . .0 .. r-000 49 LZ,--.-_FA,c�­' 61 -Tryll r. .1 - .,..A'-.-..':' ". . I . . . ,. 'd ,/ / ,.. I : . : e I / ,& I . " : .- ,;,. -J, : .� - .. .1 . .. ' ?- %_ � P L A. W 'r V. P � If f - / - .. / .1 . .0 X, r - ., . . .A' / . / : 4;' " - . ,;�� .,..,. . + I � . .-..,. � &? ; .. .. ". " / ,. ,: ." . / 4 I I I . - 40 : - ; , / , , I ; j __ . . / , ,.. -� " / , �c �! i --� - � / / � , . ,. -�. 1. � . .. � I I �-,.- -- .. --,-''-* I., I--, ,,��, ",". , ,. 11 . r -� f . ,� / � I / I >(- ,-.-..----,-...,, j, , 10" - ' 0_ PF-NTH- .$ 4 A - n : ,. _.. 11 j . . . / . ) . - - " -,.- � / ; ,,, Ilt -1 I lo. - __.jD.L_D._4..._.H �­ 111I_A$- __.+_,_9.- _ .. . ,� . ... ,/;_,. f _141-1-.1, .1 / i.., 4111-11, lz ", I I 4 . ; : .1.1 , .0"." 11 i .11, , , , . , .. : :. / ,f, , : : , ..,. - , / ... I . . . . " 11 ­.. � / ; .. -.,-,, ., 11 . . . -"el,� .I. � .. 11-11 '..... �11- .., , , / .1 .., I . 1-1 .1 . . .,,� . : - ­- �// ,1_1� .,­ - I A. -, , ... e I / . 1. . + -, I -,--..-,�---�..--...-.-..-..--....-- ..--.+.-----. -.'.+'-".'­_,'-­­__­ .. . ... . . ..... .. ­­­­­1 ----------- ­­,11-- ­­­ ­­1 I ", . �_ /*: ,q: . V - ­,1, *'? - - . ..�..., : �,./ .. / � . . .q.�\ / ; . / ..? i / . I ..e a ill r ;. . ,- , ,? " . r .., . . I 1q, Z00,;i , , ,­`/ . . . ! / - .� I .. , 1, / 11 / .. � � i , d " " , .,,� I. ... __ . . - . I , . 11 . - , , 11 / , 41. : ; * � /; . ,. � . . .� . . .,_ . A,-'-',.'-�-__ .. " _;. / .) : 1:/ I I . .� ... Z . / :. 1 ... - .. z . I - ---,/, I I / .... , .. I � "'..". - _._ , - .", I : i� ., -­ / I .... ,. , .1, .? � I ;-I'_- , + ,­ .11' ,.,­`,­,_.­., . , / .. : . 'd - -.1 / 0 ; ,�( . . ,/ . . / I . � I .. / / ., ..- 0 IV .'- I 11 I 1� .. . , I ! . , - . I ,. .1 . .11� ,_,_..�, r . ­.1-JA . . . . I . 1� ... - // � ., _­!/ r ' - I . ;, - ;I 7 .f /I / " ,. . ,'*./" . . . _A .. .. . - . . . '�? I I ", I I .. i � . .:'.* . I .Y/ .. ., I ; 11 I- . .. ,,/ . WA '... ". I . . 'I 1. .111/ � - . -,,, . :', I I , % -,, , . I -, / I .; I ,.._.� 14 . ,.. / I I .11 .;". . , - .. ." . . :/ . . v .7 1141'.. .4. I. - ... $ / . , ,.., I : A . + ,. .1 ._� 1.pl�­ ._.. .?-, :..I :�-, �( .. , .1 .1 .., ; I .� .... I-" - ..... .. . .,/. . .1 I I .1 , le 2 L. " ..� I- .. I 41 _ , , " .;...(,; , a .._ " ; I ­`,:., ..... , _ . ... ..", ..: . . le / -11 , 37 ); .1 oil I , - // , . 1, ., . ___ - 0, ,. ' " ,pllf, ,. , �� / ' I - � . AJ 4 ­�r . : : . _?___,_..,..... .. i I .. / -�, / + + �, - _....., - ..... ,"..","..., . 47 ...: . : / -e p .; / .. . - " -.-.--,: ,,_� :..4 - - - . :, ., ,/ , I . , _ + ", I ,:,------- .' ....':. .. ., . ..x . . /, IZ / + ,., 11 ..... ,:.. - . in, l�l,/_/_;_/_-,,,,,,__ .., I / LANDSPA P Ei " / + + ......, . . . Z__ ,,,�.,­. __­ , ......­ . , ._.. -1.1, 1 I L-1 : ` 14. . / / p ,; _ / -, . . �,, /L ILI. I � . .1 , ,-,P,�, I,. .I- . / '. 0) / I'Ll 1-1 ,.�.., / * - , , - / 11 . /,.. , . . . , . _... ., - ... - A I ,4 ;, ,- ." I ? / . .. I'll + _,." ,,..�,, ,., - ., ,.. .. ....� I , I ,. . / .. �1111_111, _� ; 1,/ -, ; , . ;, ,,,,�, . ... .,. , �' - - �� .- " . I . 4".. % .1.1 I ; 1, - .., I - - / ., I ... f . I _. -.1 `­ -_ ­' . , I'll, .1 � - I " � ". _ . ..... . , I , I - / - , .. , ! . ... __ " . . . ,. .. + .., .. .. .1 , i , :-. , ,�, % ,.. _.�, . 4' .., . I Q/ , , - �, ;, ,;: . , . .., " . . " - ..., I . _%, ; , -el / I / . _...�. , ; 1 14 � . / r- 4-w 1 PLANTERS � . I . - : // ?I , ,.,., . . .4 , .1 ,.. . I. . .1 .1 1. / . I , � : , �,... . - - ., .. - .1 . . 1. . -I,--,'. : �;� 11 e. / " . 1w . 2 / I V" It .. A. ".;., .. . .- .... . + AV , ". I/ W., . - '�­- - .'.'- r - & ..", . . ,,�_ . ...� :,-..-.-.-, ,,, .. - ,. .,-' , / i . � i r , . .." , ' ./I / I I .1 1111�1, 1. -, , IV . A". :,q - .Ile - . , .. , ... ,. - � I 1, ., . . - , . _. . Y *"'* V_ -" ... � _. e, - " * . ' I / / I -� .. ., � / I ,. V11- "� . -'%* - '-- - � . I Qr � I , / " , , : . . 1: - .. � " , . - .i I . . I . .,.. �_4 v .., .. . i . .....A // � . - .�, . e .. il . . ,' - - , � ... . 11 . . I--- - , . 1. . ... ... :.A - - . : . �. I,$ . , ,c , , I ! . --" ..- ", _ I . 1 4,P . 11 / '! f .... .----.� _­�, �., I y - - .. I " "' / " - I , / I " . , .. ,;, .e , 0i . . , -1 I // % . , . d . . 11 ...... .1 . . . 4 1. / . �,z. . 17 ,./� , ,,,-;,�/, ,,;�!, I ,. . ._;', .�., ,,. CL . ,e . . . : '.1 . . I? / . --�;, / so , al - 4 - . v - I . .il I . / , - .� , / f .%'..; � "I'llk-1111'e. X10 �,,�,� , ...,. ", I 1� .1 111% / ; %.6 . ... . ... - .,- . I A : // V/ , . \1--5j . , ...... O', _,"I'll"k-1, / 4-'--- , ;;;;� I - - .� I _X_*_ .- .- ", : All 7 .p / - � + ..._. :..... ... . .-..--. -...."., ./ : , : 4 - ' - . + ,. X, .. I./ �q 141 -0. 40 - rr / 44b :. ;,. �,, - : i Y fL .,- . ." . .� I . . + + - ,. - __ '� I I . � ­11 11 .., ..... I I ,,'-, , /� . � ' , : . I I.. . 1. . / , . - . . A I , - , 1, / / %, /..,.'' ,,..,; - -- ,q ,., .1 : .1 .. , . 11 � .. A`— X-e - _ ___ -,' _v 1 _?!M�4 %� // .': -� . �/ .111, / ­­ -... I �/ 11 I ,., I / .1. -�'�' - - "; _ ..4;1, - .1 / -1 / .4"!/ �,!/,-!� ., + 10 : . . I ..., I . _'_ I'-- A . ..., ... 4 - 4 .. . ci Z; . . . .. . .1 0,41., .1.1 . , /+ + .., , ,,, .... . , , I �� " �� . 4t . : - elke. , I / / I . */.!,� .,�- . , . i ..... . / - t lj;v f .� - ,�, ... I _"� ,.�. M. - I . .. . ... ... : /�/ -11 , , " 11 � / ..�.. , , � . / . . ­ .. .., . . - . ,a . 14: - - . .111, � 'I, / . / I . . .. , I . . , / ".j - �� / .- - .,- .d I . . .: .1 I . . I . ." , ....- ,�, ", " I / / P. ... / , ­ /i ,_� y , . . , te � :3 i . / . . -j , _e. . ", 1. ' . , , . , . 11 .., / I - .. I ." /. . / ., " - � .0 ,.. . .1 " / .. . *� � 0 - , . .- V . .. * I . i - / � � � � � .. . . 4 I �llllz i : .1 I I i ... I - I " / . 11 .. / ,; , 11 . // 1. I , ?. 9 _ . w . . � . , -.,;� 7 -..,.. : �/ L 4 al 00 ULJ _. . / , I � , " . I , 7 i . . : - 'A A . 0 . je , . . , / 3 i / , I , � / I A � w . I ff ", . / . I . . _,"ll, .,.;� a ,� ......�.... .. Y,,�, .� / / / 7 Val j . . . / � .. _� .. .. ,. _,**� 1. ,,.i . if .1 ... -�,".."', , . . . , , - I; %ki;�, �-;,,,/-.,.:-: I .., f . . / / I !. . + + � / - . ,;., . I Y ., % 1� 4), - . 4 ;. , "' / / - .1 ?4 .. ., //. , ,q *11, ,e I. .; . 11 1% ... �� .` / .. .,. I I / ,.,. - . . ,-,, / . . � - .. + + .. 1%. 0 - . , 'r 1, , ; .1,11. % ill - - I -, / .11 � , il ; . . .., � f : . 11 .. / , , �� � . , . / I . ,r . .. .j . .., . . / .1 . - �, - - , .// . / . / . _ . ­�: //: I .111, - -,. , r ."... / . �,, te , i4; , / . I k / . � r . ,.� . / , r . / .1 I I f�:,., ; . / !. , - - ,.., , I � I .%, - -, - ,.., - . p .. . ,,// "s Qc I r ... � I le�l . .1 i A" I . ! . . .� .., , I + / � /I I . lw . f , 1%1. - . ; .., I � -xv s ,/ - f / . ,�, I . .11 1, I / . . / .., I . . �/ : . I / ... i, ; ��Z,_;...,,.. . "*--, I e/ ; ." 1�1 � , v .l. -0&, . , , "I . 39 I I . . , /Z r . >*-�- - � ,�) I I ;j dall", '/'/,////, ., I . i..�:-­, I . .1 I I - ".10 / . ..... . � .. � . m ... e ' 4 . 'I',, : 11 .., . , X D - ,., / I i / ,H C_H4%jV4r -.1 r. /5"IN + + + , ,�, .,." " I , I . . - , " / � -j - + : - A V/ 1! . -.4.., " I C �,I�N+W .>. ., . : - ;pw/�, I " I " , .11 . . . . . . " � . I . -.. . %. d.� e , . I I ./ " 11 r . . . / � I .., / i / / " / - I W, d . . ... , : . I - . I I .." . / .� /, , Y - �/ ; / / �2-,-­ �. 0 + I . . . A� r I I . / .._..� � h ..- .� .�, / i i -1 . . / I " /, ,;.: " // : i - , . . I , " : & .0011- , ; I f . I; � . . .. - . . . , . . / . ­1 .1 1. -// � i . . . 1. .- . . : /./ : i .., I " % / ,�� e", ­ I, . .... � / � � I I I I . � 1. I % �, *, , . , / .. , , ..,/ I - (:0pw,s0rAv,ll;T1,Qw_- *,� I/v . "'. , ,�.�, / / -11 I -q%#; .. -,� /­ 1, // �, ?. 8 , 'i - I � .3 /, � I . // 41 11 . . , I r _.... / / ,*�� ,rl c ./ ,0 . I ,'k-I'll, I I 11 * / / * Y" , .-I / /I..'. , / ; .. . I . -.11 . .� I : . - Ir .1 � , � . .. / I // i . . , / " / / ut. - kl.",.m,T-.MFk a I.- : :;,,�, . ,. // � . 1-1- 11 / " f. . .., i / ;r - . , ,/ 114 . I 2,12 , .1, I I / i ./Y . , i , I F I . ,L - �psf qqt- � 3 : I . , ,�� / ,,,, 141, ." . / / I , .../ . .... � +. / ., ! . . I ,.�,, ,/ , / /�ft rr - I al,ft ! / rl--*-,-.-,, .; ..,// ;�,,, // ! /.., . . . r I . I . 'IV..", I 11 P, , , .: ­// . , .. I (. �� , : .1 � . . " , � , i �'. - .1 . / e I, .;:r, Zi / I � � / ." ,;'/,',.,,.":.,., * * "' . / -* /j, I : . .15 : A , I I " It- . .. . I., . . , . .11 . ­ ,,,r,,-,,,. : .I. I/ I.. � *;/ .W , , m? � .I. 4, I i ,-.,,* , " ,. .".. :// / / i i f / . . A / -111-11 �, / q / " e / -1, 1''.. ! i r . ,.�..,. / .' !.,ra:. 7.3 O'.. r� L ­ .0 ,/Jl / /,,_l/?,znz,P , � , . 'i , . .. 'to ... K-Qrr�-� ­­41"W , , .1 / .11, / / . i i ._....., / ._ I / , ) 6 IV . _W4.1- / -."- P, .. / i .� ./ , I .,// I . I . / . . ! I : .1 / 11: ... d. / I., ;, ,,- ,,"- . � / / / I / �4 . /, - / - ­1 ­_"'-,',, .,. + /I . " ,. / r L *.' L�' 1� , ..". I I I/ . / : i , , ; . . 1. ."! ill' " ,/ ;/ / ; I I've : : /Y " .f . / f. la + / ;11-..... / / I / ., , , lj�,1111,41111 ,�, I � ,�/ 1, / e r. � . i ./ . 1. + , I ! .,, - , - . m/ . 10 r . . .� . V I � , . ..!.�:,,: i . . v / I . / / i r I .'. . I / + .; / , ,4, . � -,­ il / I r . I '. " . , I I . ! I ., . . / , + / .p / .1 I " / �- . I 1. ... / / t IN / i / . I .0 _r -1 V/ "It',----." lel�.. . e �.. . . / . . .,.. / z , a /. i /;.,/ V/&a, -!l,,�////, I 2 ;;p ""--,,i . . . / / . I ., .!-- ./,-- ..., / i / / / / / .11 . 9 1 e�%, ! , Y ), : lil .1.11 / . I + + .1 I , 'e" i . ". -,.,. " / .. . ; -,.,. 1, i . . , / , . * / � .1 " � . -, I . � . / : : . I /,Ll .11, i I "I . , -// f -.1 / / / I I / . . . , , I .. /,.. � . . / '-�".,�,; >_ 0 ! / I I , , � , , � .,� , ,'- ., "/.,' I / / - .1 .... . ? I. . ,.- llr� I'll. . I � i , ,.,­,,,,! - i ; / / ,;,-... / . . I j : ,-r6/,//,,. .., I. vl*t . � . + ,,� ''." I,v //.: !,$, .1 11 " .11 .+ + 'I .,- .1 ....'e. f . , � r - " , ... � ; ., i ,�, , I + + �, P. ., - ... ; i .1 . I . ,. / . i + + , / .. .", , , -I . /I/ / - ` . : 1. .11 .. ,� I i . I / ./ : * 5:w, Y ­111-11, a . " / ... ,,,.W "/" ,,.�..'.� . - ; . / I- I A _­ � ; , / -/ "'r."'.. ,." ^- - go / . " .p .111 . .1, �.el / = _j -, I .� : 51e*� v . / " . . ... .. I I /. I _11 I - r . - � .. 11 . , . �, " . / . I .� ", . .../. , I 44 i / . . --------,,. / .* , *4 + .., .; . I I . ; I / . f , : - /L , I Apr , I '_'*_,,,. r ." e& , 11 . ". jr / / / Y`,�. . I / / i - �_ � " / �'P­ . r 1 ''. :. , ,. I / .d / .� .0 - + �,,_A ;�? le .,/ . , . Z:,&- 4 Aofpo$110. - . . ..., xe0,.ft%%V, -pa I . I / . I ,.-' ;` � ,/ . , . . .,- : . // ,- $ ,- - . ca . / / . / ., r A J. �r. . . " , I - /e ,%-%b ., A . Ilk No I N.- ? + , %'. / / I , .4 0 . , / F -m-&-la-ST4. ., : / -, .� -M .?9,*. ,/ / I - / I J // I , / / �,_ . . , . I / Jo .1 .1 .. / . P I - / - 4 / . ./ / / . / I : i� ." AI , / + me ;�.-_., , / � I ." .. . / - il.... i / I ", I /r/ . / .. � .. / .., / : . . ./ ." .- / .'y " % .11 1. ." " , . I ., . ..." . .1-/ ; R: .1 / / IR - _'." V. / / / . . . .0 r' . /, z .' 1. + ,-..( . / I., "t. ,..",;. �,. . V _1 . . . ''' I ! , " . Ig / _H , . - - .' ; ", e .. . , / .1 � I . : /� ea .' .'p �6'011­1­ � I / ..'... I *A,,­­.-S­.% / / / .. / : . 1; , . _f_ . .' . L A 'r . GDO � / I / � :// .11 " + + + +,+ . . , / ?, I, ; � .... � / / . If' / $_ -11-11. , I ,:; . / / / - I <�(j A ; : . I ; , / , 'III/ �� ... ,,,..- � / fl�. - i ,y. ". , , ! I .. / . , 11 ;�� A- - ­ ­11� .., .. ,.. // I , , ,:N ��i, 'r - � . - /. . . / z i . . . / ". / . 1110 , , .,� /11 .i .,.. I; I to : . . I I / 1� I / � . . / . . ` ";.. // . I ". . 11 . . : V-1-11 . .:,;,-, I I . .A,.,,^- r �� e , . .. I ?'' / . I U_ 0 I, / � / . - f-11 - I At /: � : 1. . // , ", ,-, /, . I N < 'r - / .1 - . : .1 . .,A . / / I I- ... / / I / / . : , . � � �,.�-, / .*, ?, , "I - li . I I / I/ .. If . I � - "I',-, / �,,, 'I / + + I . K 11 / / ,:, , .. // / . . I -�, ... . / / / 11 W44, 11 , . : 1, , -11 I/ ..V . I ! I / / .,.... . , 11 , I . . ;/.. I 11 , / ,��ebi / i . I . . : -1 Wl�,,- /I ,,,, to . , �. ; ". / I I .. ., , . , ;/ / . m z � I .. / .I. - . / / / .; / / ; : 0 10 / -% I . ,� .. , i + /./ . , I/ I-li .1 , /. . . / / I bw w / ', z ,�. 11 . I �,. . � V I / / / . ? ..� / / / � 11 . I 11-1.1* \ . . .-" ., ",.,:,. ;, !I I I i / / / A� 11 .. ; r I % 5/0 le / 1-11 , . I 1(0 , / .1 . ,,,,#, W, : : / , ;,, / .., .. ", -i / 11 .. "' '_ " .r.',-, 0 � ; -.111, 1. I, I /� ,.. ; .- I ,// / i i. ; .. 'i, .. . : : / " , . 1� �,, / ." " / / -', ' , _.' ' ., . . C-) ; . "­ - i / f S � , I .� , '" . � . r . . � . . // / ! sk . / ., / ... i / . : 11 . , . I / . z . / z ". / --.. / . 1: / a . . / . ..... / i / / / : , 44 : : / Sa / I ...... .. I -,,�, - ,,, , , , ,/? " y"..... I .,,,r . 11 . 1. I I , . , I ,...; - . A . / 11* = �; 11 . / I , : / x " 4 .- � ,,� IV, -,?"-.,/ I 11 . i ; a . / . I .I ..e i / ,.� / / se 7ft v / .% . // z .? ., "..,4 .. .... .. �. �. ..-. " ,. *,, . ,' ! W / / 'r ! / I : � : I . / / ,_ ./ 11 . . ., I � / . - /', / / / � �� ft-0:00 I vile "'. . , � I ..., I ;�*,, .. �-.- .; - I � : /� / lwvl0,!,/,- I'll-,,, . i I % .., Zllk. .. - / ", - , ,:A-* " .: "A ; ." Z 11 .., . . / . . .,, / / � � . 10L / I . I ,// I UA / i � / I / ; �? AQ� . . I / . / .l.. -, .: , "-" . I , wk� / - /,.---,--.- e i I.., . 1* -� I r / w ; 11 "" .� � . �%,_,, ""­*, 10 . .., . . . , �/ / / 1 Im LLJ I + / / `­.., / / , / I i AE ___,..___.__ _ 'I ; " ,.-" ,/ r / i . - � I . , I / 1� r .. 11 /I : , , : : i .1 / ., r j / e'. ,� ,�,, Z.. . -, �_., I - / . / 11 11 .1 11 , r . �.; . '. , . . ,�,' 'r r,*._ . " .. , . � I . It/ / I : . . / I : I I / .. 1-14-A . . - �,r / _', / , . ., -- .; .../ I 0) / I I", I / : : " : : / , ;.- , I _ .,' /,,-' .� .. .� .%- I I / . . _... . - ;",/" ** ck - 1 j7k- 11 " , . � ;r .� - -. *-, ", /I -*./ . ". I 1 �&, ,,, � 4 lyr, �r / I ; . �A 4 . / . I , ". " 1, ; / / . �/.. / / 11 I I .."', 19'.. `.* _.,,� . I/ , . ... , / � , ��. . / / : -, . i I / I - / ,,, .. ., j , I . � . I ! / .'- / / / i / _.. i - . / W , , , 7/1 0. � V �,-11_11. > , �,�,­ , �, , ­ / i . . PLANNING �/,,/Ylm �� / / . � , he - % % .� .I. � , .11 / r� , RONO r : *44% %; ., . -, f/ .�,, /� , / . / ;', ,� p 19, ,, ?, /.-,*,'. , ;. .. ""/.' / . � . - / : / : " . .-� . .,./., i � : - , , . ; * . / / / ." / .1 : 91.1 eA ; /, .::. ,., /' i., lw 11 " /, / i I � " � , / - // . i ,. . � . , � ' , �; , ", / m 0 � / , 11 * ' " ,,: ,.,.:.,,.,. � ,. . .. - . I .. - / ' . : : / / . A i- R �- . - /' * *A � ., . .1 . ,".. - /! / : / / -j / / ;,, : ; : .. / 11 / " . " .11 ..%" / .'', / � 3: ".. .� /I ,,,�� . + I / 1�1 "' / " .. .1 11. .. / I'll IIJF 11 L / . I, . / / : : w , ,/ . . "', _,.� ,., /� , , '' , * , , il / . M 0 = : . ! ; . i f . / /­­., ", f i � ' " ( i : � , / ?" / ;-, , . ' " ' � ' / , i . /,i , A�.; . ..,� .,/ . / ./ ,_ / / ' t / - (r) Z.�. ,/ / i ....'. ..( 3p, , 0 , a 'L /��_ _ "%4b IV - , � " .. ,,-..rr---% 6_1-�_7,'i ., __ - - __e _,_ -'!' ..--- TR NFIC A ROW . � . // / / )l ,­,,� .. // / , j� 11 : I .-*., + + V /f/ ,,o ,(., + ..%" ... , .1. ,.-v . , " "' / r . ,I / / , ; / I / i / : : : . : . ." "t ... . � .I ;, / i? ,,,. - j4,,.,' i, ".1 � I .z 'I, , il / / . ; ... . , , . . - I. - I V . 0 ! 11 / / i I / / / . / � : i 1. + ,� , el +� /,� , C., , . -'., . . ! . I , / . , , . .. 1. , � , . / . --��. / ! / : / I . : I / ." .-,/ " I , ; " , " , ".... ..:'.. ;,/ � / : . CA ad i . . . r f, - �, / / I I , , .. . I � _. * - � : : / . .� I : "I f. , " . . � ..t .� / . / 11 11, + / .. : I . el ,. /J. "' ... " - * ;, ., , . ,:�/ - . � i . . I" , all' f, - , . Y .. ,:; /. 11.1 ; , . / . �: + _r / ,. I `_ , i . , �, /I / as ; // . .". -, - -�-, - � / / / ,�,, -, .11 / / / . . 1 .17 + + -cl ,/ ) . / ,/..", LL I II _... I I .. .1 .,� . . : : I + P. If ..? �r ., � I . / I . . ,�` , I/ . .1 . . 1, . .r / I., , I 3: : , 11 / �e I . .. � �l .1 11 6', / . � I /* . . / / � . / I / . -1 . ", / .. .1 / " . "'.1, 11.1.:.� " . , , ... // / .1 I -� .. / , / r / - / / / : : / . e . .1, . . . ,,, . � ; . - /. . i '..",. ly I. . :i 10, I i _,.%..... 19 I ; .-,.,._l.,i,, . 11 / ", - 1.11*// / 11 � a ; .. �, - . / � .1 .'. I/ , V f. I : , - w � I 1/1 . ii I � -� ,/ I I : , ?: �.-lfl .*, / / r/ ., / / I / / . . ?� e " " . " , � / . . . , : . . I . / ? � LIJ ; " ,/ . , � : I - , _ / - + ./ .,--il / ! ; �- I / I / / / I I . / 1. I I . .: . . - ... " / " - I ,,�'.­�! I // � : . . I/ �/.. . . - � --/ �` I . " ", � " -�, , ./ . .. � - I ( . ". I I, �%. . I " 1, le - I J, :�-- �-,,zme� r, �.Pl cor,der � Flagy Y . . : / . k. �_ + + + / - . ....... . . ...- ; . ,� Z<, . I / .c , - � .� . f I � : + + . I .. .// .` .? � / .� A ,.,: - .., - ,r,* / . , t. . . 11 - I /,,; , , , '/-/ i I / . . . I . - , ;­i, , / : In z *0 ; now . I : 11 ! . / .1, � " I /1, N" ,. ,?, I ;. "'.. - �. I! i / I . � I ; I;, .. __,_, I ..%" . . ? , ...: ,/ 0*_,�, ! . ., .,,?/­, I / I /I . . . / - - . � , , - I " . . . . i 0 i 11 " 4Mutred : : v , / .. 1. _� . / 11*1 11 -1 / v_,, . . . � .. /.-"-,.. � . I . / / ... � L/ � '.. "Z i : . 10. + . . . , . � �, / / / / / , / / I '3etbRcksij,l_,:,. .� . . / -.A- . W-"--#- + / � I "",IN,?--,. - I I . , ; ., / . - ,-./� . . � " / : ..,- . - 7 .., ,_ 1� ,� . - . . . . / , I ", I .., ,. ... . .. . / " / : N I .� i . / � . / / f ", .. y I I ' : / / . ) .. .1 I . . I I ; ; I I/ I I -, , I ; I � -I.. . ; . �, 61 .l.. i .. .; . �/ �i e . / . " I - ! I I / - -_ -- � 9S REQR, r. 1, / A .... ", " ,,;�,? : ; N I I / ... ? . Front /,, _ -j-- I : . RKING SPAG ��4 - ; : / .1 I / '%'-,,,�, r 11 . // ,. - , .. il / #/_ : . . / : / / 11 I � I i - � - :,./ / / ; ! ') '7­ ,I, . ­1�� . " I " / .1 I I (c ��, , qq OA5,f..(, & .? - R= 17.50 , -, // , / .� / /S' " �l I 111 I - � / . i ! I .ld .11 I . . / IF . . / e 1� 11 " / . ..��,. ,; i'l . . 7. . I f� , ,7 ., ,Y I / . 11 ,� ! i I . / . , .., -,/" I I / I / �,,- ... ,* I p �O . / / "', : . __ - ... /F/ , 11 ,� 4, A f� Side&k) C)+,/ � . / ... .. 11 I i _...,. , S; - /; I , . .;. ­ / . / _ . . / ­._: 11 ; * I . 1". ... ; I .., . / , " /. I/ i ....... A. � -f / ReAr I, - I- // PARKING SP/( *6 - .., ,./ Z=849 / - ... " / e 'r I I,." . 11 I I . . .., "i . It / . f -., / - , ... : w ....- .1 ,;/ . , - � I/.. . � I I CES PROPOS . /,F& / .. . , ,�, Ic ! 41� / I I ,6 .90 .., /I , I/ - � I . / . , . � _' -T.- .? ..� I.,. . . j� .. I . . - / i .. I I 7% / - , ,.. , i / 1, ,('/ . I . i ! I , - : i . ". " . / / .... a P" .0 / . I 11 . . I ,: ".. . - / I � I ... ; i / . 11.1 ,,,, ./ : " /I / I . . + / I I * I � I . f -2 / : :. - -.. - .. e I /', ., !f -, .. I,/,. , �,// !I � - x '.I'-'- / ,.. ,.. ./ . � Z-1 .1 .. . .1 /11 . I - , ZO � , . . . I gthq - . : . Z(7- e � // /. . A / J5 ,...;., , � - ... , , ., " , >1 , . -// / ..".. � � �� / / ; ;, .�.; i i" .; I .. ,. A� _.. I / I p ,/ , e "I I ". I., , . i I ; - � "-.,. / I .f v ., ... . "'. I :1 / . . . " , ,...�. . 11 4' A_!�_ . V, I ,� ./ I ..... .. � . / It � ; . Height . . . . . / ,,_� .. J . �-. ... I � I . . � /.=== I - . 'A... BARRIER;fREE PARKIN G'SPAGES:. I .I. ., j . . ., .., 4�, , ,- ,. I ; . : I / / I / / - r, .7 / Z---' I . , " I ; - I .1, , ?I ..... f I ___Z____4.�____d_ .", .11� / ..... . "I � / . / , I / . ., , ,"/ 1. I ; . - ;� .. ... J . �,%,,. � X/_,;�,./ ��107, ell�110 / Iry, :',;�.- � /. I / . . : I ,........ ..,., / "I" t/ ; . �, -?, , li � __:�_, --,I- - .11 + . I I . / I ._­...� / -, . ". ,. I .... . ,.,�., . � -,...,.. 17 / " / .11 I'. P 4 ;;, / .1 . ; . � i I i . I . . , : / , , ". � � ,,�., I . -, - *--'Y , . .� I / 1� "I : ., /.;:---.. . . .1 I . . I. ,: -�/* - f I " . I /. -..,-. � .. . -�.., " 1, ... " 11 1. . *�/ / I mmommmom -,..- �! ; " / / - /I-, . / I ., ,�, . . . .. , ... , Y., ......'. � "I / f / / / � '--^ .,. ,. / .. . ? e . V - : - 1�1 i �w /I / , -';;.I, , i / i : : . / /W - . ': .:,,,�.' ',-/ , / . .1 61,�s . t i . I �, - I.'. .. � . . .1 .. .*,.,/ ` . V ' ! � . . - " i / / �. - / % 1. -1 . , �. . / . .." A - I . � f , ". /.I : --. ::. a 1. * .,....,. .'- / i i ; :/ / :A40 . ,�, .1 . , �, - , . I ..: I . , ..: -1 ; ! / / . I i `­.... / // . -,.-, - j( 110 �. . / ,. .. ,�I� . . ..." ,.! . I e�. .. / 1. /,; / ,,,,�/ S.E.M.1- C I v 11 L . ­(:4 Wfir"C­pV­## t ­ - I . // , ., V .. / . ,,, �; � . I - I I I e , .. "'; A I L i-7 / , ,. , , . I / ,.. .1 / : I / . ., , 41P 4", -../ -',./ I ,. . . d. e..1, � / , / : : / : e , / ".. I . � . I i - . ; � ,. 'i'_ il,- ,/l/­,,,P./ i " z,,.� " . I .i; i : - '� r I . / / / , " ,� � , I .,.-. ,;�--- .-,- - . . . . . . I/ �, a ! ­.. . / . % ... ,. / % . -/.- .-/ ,% , , ... i A." I . %-, I , . , - � A I ; - i ; I I I '/ "I // . I .��,, , h1V . I . i j I � f. .,) - - . -- , ,q , -� R . d (11 " - mi .., . .. .. . ,. , � .. I , ... i : : / ,.. .,. : : / 4/ .. . ., *< r ,-, Z I , � , . , / __lDRw" 4311 .­ ", I ..' 11 [ / : / / i . - / ., "I &* I '..... I ApplZJ)'401) iv,� HOTE �4 � / � / A I, ., /' . : . . 5�, . y �, .. ,( I" . I / ", el . , ,� � I ,�. '. .. , $­,­­C"j'0-+ , , --) [ / : : : / m�/ ; i / . .1 le / .,�. i.., . . . / " " il . . , 1 [ �,,,,, : :/ . / �. v .� 1 v .1 ,� -Nei � �E�T N1 I , _.,,..,..,,,.,�, : / / / I � .,,%. I. ;->.'. ,- . . / 'j r .;�l - . I A. , �/ / ; . ., .. I ,_ I L_ C3 .., ... / : 011� "I -� .� ., .'I ..�., . . /. , 141� ..".. / - . 11 %,� , 0 . . " . - . 'I I ..p . i !11 . , . / - , , .. V ./I . / 11 .1 ? . .. . � . 6,1V - I / / . 11 , � . .. , , - - 0, I . . . .: 1, 4 ,,____� I : ,�: / . 11 � . . 11 CA- / .. / ;, ; e" .. e . ­­,f..0_A,_.­­c VlL0.._,FLW4ftcq Ill. i . , I . - . I J,� i I - . / �// /.,( & . ! I -_ ,. , I ......... I , ,// / , - ! : . .... . 11 i / / i/ , 6". tp . I.". . ,/ ..,,I . , I .. I I , -, � - 0 , , , , .. - RJ I " 8 20 A � , . __,.�� . - ,,-.'. : / : ,�.. I �/ U_ , . -� I . ..4 : :"// / -z' -S , 1. I I , . ... . . i / I ,V r . .. , / .. I /, .. ; I!' , , , I � . � . f . _.. le �, ; , , :" I I I , 0 . / - / .;, " / --- . i I . >1 , - , �., - I .. ,:. .. .,; / - .11 � i � / . . .. - , � - / 'I I - - , , I I I . i I .1 : / . / .... ,,., /.., _Z� C.� - , I v -� , ,� ;- ,� , ., - .. / I "' / , . . /I i / f � . . 4 - .- . , , I , / / i., -, I / / .. - .4, 19 It = 1*kJA �,,. / ., . / .:. , ,;, ,* . ___ t-mia-MOV.S.M.-F , .- . ­ .1 I - I .1% _______�_ / '. .-;/ : : . : / / /: : "". . ..,,,.�/ r .-N. . p i f W:N I . - : : : . 11 / /,-i- -1 , . - I I 3 wl m E E, � It " I ._.." j. , I , �Waow__ I /, �,..,� . .� - 'i ;, . . ; . . ........ -,, Date: -­_ ./ / / : : - , , - - 11 , " , . /.-..". /. - I ? ,. . ..... I .1 . ,-, / 1. ..'� / I I /, . . / � . r I ULDIEG )EFA I �; .1 . , % . /.- - -, .: .. "../! . f Tr� � .... I s : ./ - .I/ . ..", , X - " ., " e . - - ,?., I .: . , .. .,.. . -�./ / / . r........ ­ I I I. . I - : : / . _.. . I. " , ; .- , ml . , , X ,., , , ;� I _� . . .. . .,.. . : � " ,. / e .. -.1 PA4NK I Nco-LOT + ''. ot 1r) ^� 11 ..�,, ' / . �� / / : � 0 L3'N / ,�..,.p . . , . / C, F. r- r "M . ;,-., ._.�. . : il / , :,� / / - .,� I � � I . i /, " , , ------ 1,0000, -, � , 70 - �1/7 O:r I �jw ��*"�,__,�,` I I 10 I I e , /),, .1 ; ,!. ,�.,;/ I I I V 1, I "' I // / / I I I -,. . e "I '-.-..-: : I / I .-I'. // . . Is ZZ I. ,,e ., ". e" / I .... . .. I / : ; I : / ie . I % f ,ee . .. '' � ) . /* I � . . . ., J.. 1. I . I . .. I -1 : ,( : 11 . . ,......-I. I.I.- ­1 r I -.. I / . : :. : . / I :/ . ., / . , lk ,/. . . - .*. Y / -1 . ,/:� ,/ / , .....­-1. --,-.-, � ­­ I - ".. -,.-... -� - / P ../' 1.4r, NO 'A �, X .". / .1 � ... * % , ,A &� , %WNL Oe ,..- ., / . - / . i: J :.../ ;�Np\ i "4*1 / ie , 11;1 / _.A.4"VAM "N* . : / . 0. . f/�,Mlg(g to 1, .. - / / . -, I , I / li, / ..,. � 06ae ,��.- .,! / -, %," . .4 , . � W-1 .... _,_.__,-_., - - - . -.1,'.. : : Ill: / :1 / * N ..,.., C) x / -Y .r ,� / le .1" / i .. V . . r,�. . I -,ley - , - - + I I + . : " - , X . I : . . I _..� ?, � ,� : : .1 : I . e // N ., . . el .1 - I /.,�. // � 1 - , - � - -_ . . I i / . �r . / �t / .�� el, I/ - I I / . ­,_ i ! - . I'. I/ .% � I .", , 1 '14? I" I.- . .. 411 ./ . / . I � .. I ... I � . ... ..... / .1 ,� f : I ,. " .1, / " �, , I.' I"'', / / / I .. . . . . . , . I , ... � ; %; �-, , . . I ,,,� � .. Z I .1 .. . ,!'m . `1111!�­ 111,111-- I I . . " - -A, 16 w I ,: llf : .,. i,;,`, / I / // , IQ � � V,.-. .., , - I" / .*, I 9 . ,,,, I . 3 I . �,-, .. . / / I I . . I . , I- / ,// ."s ,. .. w / . � � I -,. I N* , - � , .,,' " � .. I Pa. .. X - Ile, __ , - . - - � J ** . :1 - � . k .- ---.--- -,-.-.. . � .. ./.. _.. - ... I _... ­­­ + . . � I Ea t. . . '. ..... .. t � I ..� . ___f_j__1_ _-LAM11- P-%hl- --- ­­ __ � - ,; r AQA%_ �us 10 Wl 00ec - - , -_ --- � r I . ", I E_ + - .." , . .r,,, � � . - .11 \�l I � I - .,.::: �,..,: -1 I . - . r ­., r � - f P. � ­ . . _., 3 r:i,,� _____ I _d - �',�,:�-7�,­�.­,­­- ­­ _,__ '', � , �, - �� .1 1. I I _,;��,:� -�:,�­�,.";�4�.,, � � �,­��: r - r� -1 I—. ��. � L ­,�, ; _ ,�,', , _;­� "I.. , r , ,7� _ _ �.­��: r ­��: r r� ­��: r r� . ­��: r r� . I I,. ��, � Ill limm- � ­­ � .., _,..__ .......­­ r ­� , �: r r� . I I,. ��, � �., + .1 . . . . . . . . . . . . --------- -1 zLp-.C.pp-ml.gl"*-N--"-"17",ilI __ .. _,_,,____. _______,_._ ------- � - ­ "I". I I y�� � . - ­ " , I , . � Ill - � i � - I P, ev., ?RUNS so 0/0 or- CROW" BUT Xclr& IN *rHe L.&A60mv, SECURE mro rAA%-*v- IRON T -RA61L. OrHptw 120 sacsylow op Hose -3m 09EP MEPIUM CHIPPIEr.) C.604K Ewzx mul-c-H IN 31, s4ucem. -L)< P.00 r SALL 01.&Ml-rSIXI. REMOVE BURLAP FROM UPPILIZ I/S cm6se Oro ptoo-r 50,o., �.��PLACE ON CONG Or- 11­14140- FIRMED SACKFIUL pL,4Nqrfmc* sollL. - srAPLIFY lSUSQZ&0E DELP ROOT "LL "OT "rFket PLANOT IN4 NOT TO SC&LE THIN 594NCHES BY 30 0/6 ;keT&jNlW4 NORMAL SK&Prs 31' DEEP MEIDIUM CHIPPED CF.OAR 154AK MULCH IN 31, SA.UcEm. fzemc>vF. SUIRLAN.P FROM UPPER, 1/jS ONLY OF A00T 54k.L PL44L ON CONE Ofr -HAND-FIRMED orops-01L. �2_x K00116SALL scARtFy SU84R40E 61" oerLp.- 5HRUB PLANTI P44 N01 `11`0 SCALE X li 4=10 11 PRIVEN 90t UNION PLEX 9,41S&R. F-ITTIN4S pvc pipp.0 � -F-L-aoie4 FNC LWrE.R,4L. LINE A TZIL opt 1.4's - REV. Rev. I LANDSCAPENOTES GENERAL AT ALL AREAS OUSIDE OF BUILDING FOOTPRINT, NOT INDICATED AS PAVED, INSTALL 6" TOPSOIL MIX, WITH TOPSOIL WELLS AS REQUIRED FOR TREES AND SHRUBS, COMPLETE BIDDER -DESIGNED AUTOMATIC IRRIGATION SYSTEM, AND PLANTINGS AS FOLLOWS: 1 HEDGE REMOVAL REMOVE EXISTING HEDGE FROM ALONG EASTERN AND NORTHERN PROPERTY LINES. GRUB OUT ROOTS, DISPOSE OF DEBRIS LEGALLY OFF SITE. FILL RESULTANT EXCAVATIONS WITH APPROVED TOPSOIL MIX, COMPACTED TO 75% MAXIMUM DRY DENSITY. 2 TREE REMOVAL REMOVE EXISTING OAK TREES FROM ALONG EASTERN PROPERTY LINE. GRUB OUT ROOTS, DISPOSE OF DEBRIS LEGALLY OFF SITE. FILL RESULTANT EXCAVATIONS WITH APPROVED TOPSOIL MIX, COMPACTED TO 75% MAXIMUM DRY DENSITY. 3 TREE PLANTING ACER PLANTANOIDUS "NORWAY MAPLE", 2" CALIPER BALL & BURLAP, WITH 2" DEEP CHIPPED. BARK MULCH WITHIN 5 FEET OF TRUNK. AS PART OF MAINTENANCE PROGRAM AFTER FIVE YEARS' GROWTH, LIMB UP CLEAR TO V-0" ABOVE ADJACENT FINISH GRADE. 4 HEDGE PLANTING 110TTO LUYKEN'LAUREL" PRUNUS LAUROCERASUS, 5 GALLON CAN, WITH 2" DEEP CHIPPED BARK MULCH WITHIN 3 FEET OF STEM. AS PART OF MAINTENANCE PROGRAM AFTER TWO YEARS' GROWTH, TRIM TOPS LEVEL, NOT TO EXCEED HEIGHT OF V-0" ABOVE ADJACENT GRADE; TRIM SIDES TO 1:12 BATTER, NOT TO EXTEND BEYOND FACE OF ADJACENT CURB. 6 Z UKVUNUt;VVr_K rLpkm i um" BEAUTY1. "iGALLON CANS SPACED 24" ON CENTERS COTONEASTER DAMMERI "CORAL EACH WAY, WITH 2" DEEP CHIPPED BARK MULCH BETWEEN PLANTS. .. ...... .... ...... ..... .. F u kolm c-avf.9 &4 IL OUT .*J.*IrF.0 pll&wTWe4 ....... .. . 7 RAIN GARDEN PLANTING MIX OF "MARCH MARIGOLD" CALTHA PALUSTRIS (AT CENTER); "JAPANESE SWEET FLAG" ACORUS GRAMINEUS (AT SIDE SLOPES); AND "PLANTAIN LILY' HOSTA GINKO -.3,2.4-a CRAIG (AT PERIMETER), 2-GALLON CAN, WITH.4" RIVER -ROCK COBBLE SURROUNDS. 8 FILTER FENCE TEMPORARY FILTER FENCE PER DETAIL. FULLY PROTECT ADJACENT BIOFILTER SWALE. .......... . .... ... DUILDING DEPARTME 0 fy or MV �j - [7 , ONIX9 . . . . . . . . . . . . . I . . 1 90, mA THAT PORTION OF THE _2L1/4, _N�D/4, SECTION _aE TOWNSHIP _37- NORTH, RANGE __Q!_ EAST, W.M. Lo Q -D T T- T - - - - - - - - - - CO cn CONC. WALK p ..A D-D- n4--�e_-D-D_ ���BD D D-D-D-D-D , " %. .... T- T--t- T- r Dl -D�D�-D-D-D-4-D-D_ D-D 4'. D2 CWH FLOWLINE, S3 I -6 _G -6 s TAX LOT NO. PIT 62. 580700004001 4j 4 s-s-s-s s-s-s s -s-s-s-/ S-S-S-S_s_�_ <;2 s-s-s-s S-s-�-s _s N89'1 O'J 1 "W 'D3 -S _R =_55TOO L=211.73' D20 4v C2 16J.85 p ....... 44 el n S ... ..... .... ......... ... . .. ...... p p T13m: IFOUND K C-2 .......... co.......... * .......... ........... .. - ......... . ..... . ... . . . / 0, R ...... .......... - D4 NAILI EL. =J48.7 ........................................ 346 ................ ......... IR.... .. .......................... . .. . . . 11-1 \ F %/ .. .. . . . . .. . .............. . . ......... ......... ....................... . ..... ..... / ............ . . .... ....... C-i ...... .............. ................ D19 Sb* ......... . ...... 8 MAP�E 41 TAX LOT NO. ....... ....... . . . . . . . . . . . . . . . ... . . . . - . . . . .0 ...... .. ... ....... ...... I ........ 580700004001 4L ..... ....... ... ... ............ ISO, ....... ....... ..... .. . .. . . . . . . . . . . . . �L C NC. .... .. ....... ....... ....... ............. BLZICKkk\ D 0) ....... ..... .. ...... ............. ...... .... ............. .. .. ..... ....... TAX LOT NO. 580700004008 ................... . . . . . . . . . . . . . . . . . ...................... ........... ....... ........ ................... ........ . .. ..... .. ............ D17 ....... ... ... .......... .. Y i: V 4 ................. . N ...... ........... (�61 ...... .............. ..... ........... D6: D12 .54 .................................. ................................. �&c P a ... ............................... ............ ....... ................. ... ......... ...... ............. .. .... ............. .................... ......................... .......... .............. . . ..... ....... ... D 11 ..... .. ... * ... ....... ....... ..... ........... "0" 4z ... ...... 6 4qz........ . .......... . ..... ............................... ............ 14:7 ............ ..... ............... lilt . ..... b z A�.......... ....... . IMAPL 4 ............ A� ki .......................... :y 4�) . ........... ... .................................... j 7 .......... ... ..................... ............. C.2 ..... ............... ..... ...... 111111111411111111 . . . _. - x�' / ...... ....... ...... .... n%_ ..... ...... ... ...... ..... ..... ............ ..... A� ..... .................. SEWER & STORM SCHEDULE: .... ....... .. ..... R= 17.50' ........ .. .' .' .. .. .. .. .. .. . ... . _.. . . - / // / - . / / .." Sl TOP OF SEWER MANHOLE J5Z57 ............... ....... L=8. 49' q c) (j, D r�D= D CIIRB �l D2 7 _rn CONC.) ... ...... ... E. INV J46.57 (12 ........... ... ....... .. ......... ... ... ...... CONC.) TAX LOT NO. .............. /4.1 SW INV. J46.67 (12 D7 .................. v ... ... .................. S2 TOP OF SEWER MANHOLE = 350.44 580700004001 ..... ... D13 v NE INV = J4J. 09 (12 CONC.) .. ........... ......... 1/0" UAPL ........... ........ ....... CONC.) .......... ...... W. INV = J43.19 (12 550 SJ TOP OF SEWER MANHOLE = J47.45 .............. .......... IN v = 47P R 1 LEGAL DESCRIPTION THAT PORTION OF OF TRACT 40, SOLNER'S FIVE ACRE TR4CTS, ACCORDING TO THE PLAT THEREOF RECORDED IN VOLUME 7 OF PLATS, PAGE 25, RECORDS OF SNOHOMISH COUN7Y, WASHINGTON DESCRIBED AS FOLLOWS: COMMENCING AT THE INTERSECTION OF THE NORTH LINE OF S410 TRACT 40, WITH THE WESTERLY RIGHT OF WAY MARGIN OF STATE HIGHWAY SR 99 (P.S.H. NO. 1); THENCE S25'4J29"W ALONG SAID WESTERLY MARGIN A DISTANCE OF 98.17 FEET TO A POINT ON A CURVE TO THE LEFT FROM WHICH THE CENTER BEARS S65'30'59"W 25 00 FEET DISTANT; THENCE NORTHWESTERLY ALONG THE ARC OF S4/D CURVE THROUGH A CENTRAL ANGLE OF J9*47'30" FOR AN ARC LENGTH OF 1ZJ6 FEET TO A POINT OF TANGENCY; THENCE N61'16*Jl'W A DISTANCE OF 16.67 FEET To THE POINT OF BEGINNING,' THENCE CONTINUING N61'16'31'1W A DISTANCE OF 48.42 FEET TO THE BEGINNING OF A TANGENT CURVE TO THE LEFT HAVING A RADIUS OF 50-00 FEET, THENCE WESTERLY ALONG THE ARC OF SAID CURVE THROUGH A CENTRAL ANGLE 2454'00" FOR AN ARC LENGTH OF 21.73 FEET TO A POINT OF TANGENCY; THENCE N89*10,31"W A DISTANCE OF 16J.85 FEET, THENCE S25*4J29"W A DISTANCE OF 106.84 FEET, THENCE S64'16'Jl"E A DISTANCE OF 158.29 FEET TO THE BEGINNING OF A TANGENT CURVE TO THE RIGHT HAVING A RADIUS OF 1Z50 FEET, THENCE SOUTHE4STERLY ALONG THE ARC OF SAID CURVE THROUGH A CENTRAL ANGLE OF 2748'40" FOR AN ARC LENGTH OF 8.49 FEET TO A POINT OF TANGENCY, THENCE SJ6*27'51 "E A DISTANCE OF J8.JJ FEET, THENCE S42'J4'OJ"E A DISTANCE OF 12-14 FEET TO A POINT ON A CURVE TO THE LEFT FROM WHICH THE CENTER BEARS N42*01'05"W 86.54 FEET DISTANT; THENCE NORTHEASTERLY ALONG THE ARC OF SAID CURVE THROUGH A CENTRML ANGLE OF 22'15'26" FOR AN ARC LENGTH OF JJ-62 FEET TO A POINT OF TANGENCY, THENCE N25'4J29-E A DISTANCE OF 172.09 FEET To THE POINT OF BEGINNING. NOTES: FIELD MEASUREMENTS FOR THIS SURVEY PERFORMED WITH A 2" TOPCON TOTAL STA77ON USING TRAVERSE METHODS THAT MEET OR EXCEED ACCURACY REQUIREMENT5 CONTAINED IN WAc jj2. ljo.090. THIS SURVEY WAS CONDUCTED WITHOUT THE BENEFIT OF A CURRENT TITLE REPORT AND THEREFORE DOES NOT PURPORT TO SHOW ALL E4SEMENT5 OR RESTRICTIONS OF RECORD, IF ANY. THE BOUNDARY CORNERS AND LINES DEPICTED ON THIS M4P ARE PER RECORD TITLE INFORMATION AND REPRESENT DEED LINES ONLY THEY DO NOT PURPORT TO SHOW OWNERSHIP LINES THAT MAY OTHERWISE BE DETERMINED BY A COURT OF LAW. THIS TOPOGRAPHIC SURVEY IS INTENDED FOR GENERAL DESIGN PURPOSES. ADDITIONAL SURVEYING MAY BE REQUIRED To MEET* SPECIFIC CITY/CoUNTy ANDIOR ENGINEERING REQUIREMENTS. THIS SURVEY WAS PREPARED FOR THE EXCLUSIVE USE OF THE CLIENT NAMED.HEREIN, TO BE USED ONLY FOR THE PURPOSE FOR WHICH IT WAS ORIGINALLY INTENDED. ITS USE DOES NOT EXTEND TO, AND IS NOT AUTHORIZED FOR USE BY ANY UNNAMED PERSON OR PERSONS. THIS SURVEY IS NOT TRANSFER4BLE TO ANY OTHER PARTY WITHOUT THE EXPRESS PERMISSION AND RECER77FICATION BY THIS SURVEYOR TO ANOTHER PARTY ALL FOUND SURVEY EVIDENCE WAS VISITED ON THE DATE OF THIS SURVEY UNLESS OTHERWISE NOTED COPYRIGHT BY CRONES & ASSOCIATES LAND SURVEYING. VERTICAL DATUM. THE ELEVATIONS AND CONTOURS SHOWN HEREON ARE EASED UPON CORS NETWORK, STATION ID 'PFLD, ELEVA77ON DETERMINED TO BE: 60J.790 FEET, NAV088. SET'AN ONSITE TEMPORARY BENCHMARK. FOUND PK NAIL ON NE PROP. COR.. ELEVATION = J48.70 FEET. CONTOUR INTERVAL: 1 FOOT. LEGEND: @ FOUND NAIL & DISK, LS IIJ0450, AS SHOWN RIW RIGHT OF WAY CATCH BASIN FIRE HYDRANT \ %.Tl . '& I / IV I . 1 0 GAS VALVE ...... ...... S. INV = JJ8. 75 (12 - CONC.) ...... .......... SW INV. = J38.80 (12- CONC.) ..... ....... ... tK Ile M IRRIGATION CONTROL VALVE S4 TOP OF SEWER MANHOLE = J51-02 pin N. INV = J42.27 (12- CONC.) POWER VAULT S. INV. = J42.J7 (12- CONC.) TOP OF CATCH BASIN = 356.57 Dl LIGHT POLE D ,6 E. INV = J51.42 (18" STEEL) ST W. INV. = J51.J2 (18 EEL) POWER POLE CONC D2 - TOP OF CATCH BASIN = J52.06 --l-BLOCK'S S. INV. = 348.76 (12 - STEEL) POWER JUNCTION BOX STEEL) AJA- W. INV = J48.71 (18 12- M4�% 4v DJ - TOP OF CATCH BASIN J52. 11 ST N. INV = J48.Jl (12 EEL) STEEL) SW INV. = J4Z51 (18 Q D8 TOP OF CATCH BASIN = 354.24 D4 4-- k1 ry BOT OF DRAIN VAULT J4ZJ9 D5 - TOP OF CATCH BASIN = J54.75 4"' MAPLE BOT. OF DR41N VAULT J4Z45 D6 - TOP OF CATCH BASIN = J54.94 BOT. OF DRAIN VAULT J4Z44 D7 - TOP OF CATCH BASIN = 355.2J BOT. OF DRAIN VAULT J4ZJJ D9 D8 - TOP OF CATCH BASIN = J55.J6 N. INV. = 351.16 (12- STEEL) W. INV = J51.Jl (12" STEEL) D9 - TOP OF CATCH BASIN = J5J.86 N. INV. = 34Z71 (24- CONC.) D 15 D10 - TOP OF CATCH BASIN = 354.34 BOT OF DRAIN VAULT = 34Z29 D11 - TOP OF CATCH BASIN = 354.27 BOT. OF DR41N VAULT = J4Z22 D 12 - TOP OF CATCH BASIN = 352.70 C_j W. INV = J50.00 (12 -STEEL) DlJ - TOP OF CA TCH BASIN = J53.14 W, INV = 350.J4 (12- STEEL) C-1 D 14 - INV EL. CULVERT = J4Z31 S TEEL) GRAPHIC SCALE (12 D 15 - TOP OF CATCH BASIN = J50.25 SE INV = J4ZO5 (12- CONC.) 0 10 20 40 NE INV. = J46.94 (12" CONC.) D 16 - TOP OF CATCH BASIN J49.7J OEM CONC.) s.. N. INV = J45.4J (12 S4 S. INV = J45.5J (12- CONC.) D17 - TOP OF CATCH BASIN = J48.14 0, IN FEET (UNABLE TO OPEN, STRIPPED BOLT) D 18 - TOP OF STORM MANHOLE = J49.25 1 inch = 20 ft. N. INV = 34J.55 (12- CONC.) TAX LOT NO. E INV. = 34J.05 (J6- STEEL) 580700004006 S. INV. = 344.25 (24- STEEL) W. INV = J43.55 (24- STEEL) NW INV. = J44.75 (4- PVC) D18A- INV. EL. CULVERT = 345.06 (2 4 - STEEL) D 19 - TOP OF CATCH BASIN = J4 Z 12 N. INV. = J44.00 (12- STEEL) S. INV = J4J. 92 (12 - CONC.) 21900 HWY 99, D20 - TOP OF CATCH BASIN = 346.98 EDMONDS, WA 98026 S. INV = 344.13 (12- S7FEL) STREET FILE RECEIVED FEB 14 20 11 DEVELOPMENT SERVICES CTR. CITY OF EDMONDS POWER LIGHT BOX S4NITARY SEWER MANHOLE @ STORM MANHOLE 0 DECIDUOUS TREE N WA TER VA L VE G - GAS LINE -E- OVERHE4D ELECTRIC LINE -P- UNDERGROUND POWER LINE -E- SANITARYISEWER LINE -D- STORMIDRAINAGE LINE T- UNDERGROUND PHONE LINE W- WATER UTILITY LINE S UR VE YOR'S CER TITICA TE THIS MAP CORRECTLY REPRESENTS A SURVEY MADE BY ME OR UNDER My DIRECTION, AT THE REQUEST OF KEN FRAZIER WITH DICKS DRIVE-IN, LTD, LP, IN JANUARY, 2011. JAMES D. CRONES L.S. 295J7 D . WA QTrPP AnnPPQQ- - Go % 29 7 ol %14 Ts 0 L ov DATE. I-1q_11 rD Ld ry :D ui Z cj:� L u� C:) CL < Q) (D C-) 0 0 (j 0 Q) 124 (z) Cd ? ft�: I Q) rl 't4 Cd SHEET THAT PORTION OF THE _MLI/4, -NI-1/4, SECTION _29- TOWNSHIP --?Z- NORTH, RANGE _Qj- EAST, W.M. J L 1 of I