Loading...
21915 93RD PL W.PDFiiiiiiiiiiii 9090 21915 93RD PL W NOTICE. -N'O---w-a r-r an- t Y... The information shown on the attached for use by the City Of map(s) was corn ' piled Edmonds/ its Empl-oyees and Consultants. Th,..e City of 'Edm.onds does ' n ot. warrant the these accuracy of anything set for.th on r entity Map(S"'). Any person 0 in I dependent copyshould conduct an inquiry regarding the InfOrm'ation shown*o tHe -rnaP(S)Jj including, but not Jimited to, the location of any sew-er stub shown, Suc sewer stubs may or may not e-xlst and may or may not exist at the location shown, ri nor its —ty of E,.-Amonld4 Neitheir the �"] e m p-'i- o-y e e*s 0,r o ff i -c e -r s -s h- a, I- I b e a. &I-e I n on this map(5), nor for information g'Ve* d 3ny one representation provided base upon said map(S'. t lbe-Coly of Edomw* /A< �1'6 m 0- "PLICATION for Ott!= la FILX SIDE NEW R PERMff OUTSIDE 0 INSIDE 0 REPAIRS 0 OWNER... ................................................................................. HOUSE No. ............. /) ;Fz, S.0. ....................... ... ) .................. ............... s-- 'fio'D Az- 4j - CARD No. EASEMENT No. CONTRACTOR... .................. ............. ......... ...... .. .................. .. PERMIT No. STREET AVENUELOT No . ............................... .................. . ....... .. ..... BLOCK No. � .......... ..... . ....... Lt/12-547-2.1;.e .............. t/.;.ff�3 — ... - ....... ........ ...... I ......... I ........ ............ NAME ADD ................. ... . .. ... . .... . .... ED. N2 fr� 0 BACKFff,L WORK ORDER ISSUED .......... ................................. DEPOSIT, $ ...... .............. ............................ -WER WORK ORDER ISS"D ----- ..................... .................... ... ...... 1 8 9 0 - 19 C) - CITY OF - EDA AER LAURA M. HALL 250 - 5TH AVE. N. - EDMONDS, WA 98020 - (206) 771-0220 FAX (206) 771-0221 MAYOR COMMUNITY SERVICES DEPARTMENT Public Works @ Planning * Parks and Recreation @ Engineering STREET F February 9, 1993 Dear Resident: As you were informed last month, sewers are available for connection in your area of the ci.ty. Property owners having failed or failing septic systems should connect as soon as possible. All other owners are. encouraged to do so as well. At this time, there is no established deadline to connect to'the sewer system. However, the City does reserve the right to require hookup within 60 days if a septic system is failing or if other health hazard exists. Following our procedures as described below should simplify the installation process and minimize inconveniences. 1. Obtain a side sewer connection and inspection permit at the Community Services Building, 250 Fifth Avenue North. 2. Read all requirements located on the back of the permit. Flyers will be available from the Permit Coordinator when your side sewer permit is issued. 3. If you or your contractor have any questions at this time, please contact Everett Akau at 771-0235, extension 354 or myself at extension 349. This way we can clarify anything before the actual installation takes place. 4. Proceed with the installation. 5. Schedule an inspection providing the City 24 hours advance notice. Make sure that you provide the permit number at this time and have the permit at the job site. 6. Once an inspection is complete and accepted by our inspector, you will have two (2) days to break in the top of the existing septic tank and fill it with sand. Required by the Uniform Plumbing Code. At this time, our inspector will finalize your permit. * Incorporated August 11, 1890 0 Sister Cities International — Hekinan, Japan Sewer Connection Page 2 Please feel free to contact this department if you are unsure about any steps in this process. I will be glad to have an inspector meet with you and go through the procedure so we can make the entire process as simple as possible for you. Thank you for your cooperation., Ron Holland Water/Sewer Supervisor RH/l k SEWER/LT/TXTSEWER