Loading...
22201 96TH AVE W.PDFiiiiiiiiiiii 9449 22201 96TH AVE W' 41 N d6 ZAVALES DESIGN ASsbCIAfES MILT ZAVALES 0 542'.""', 1243 NE 152nd ST Suite 8 (Z D A Seattle Washington 98115-9 .(206) 34PPIORD AS NOTED By ENGINEERING Date:__9j-I( I ACCEPTABLE T TLINE 110,-0" L. . S '35 A '15 S 5LOCv. LINE Sl E iall MAX. INC. (5UTTER 3 (TIrp) ri 0 � LINE OF OVERHAN& ARA6r. 2 r,��,M ,AWOSED 199 .0VERED 16U a LU < L IL 0 0. \0 ,,—IN65RES5, E6RES5 AND UTILITY EASEMENT N TOP OF MPORARY CONSTRUCTION OTE: A L ENTRANCE REQUIRED 3/4" 5 PIPE I OCATED I FEET 12'A5PHALT.' SOUTH OF NA OR , CONCRETE PFZOPF=;21-v' CORNER-DRIVE14 � !:'- ..' FLUSH HITH FIN15H &RADE. AATER MAIN HT -OF -WAY CONSTRUCTION PERMIT RM;EIVED ;i" ..� , . r7 i,, AND INSPECTION REQUIRED. PLAN. 1941 B SITE PLAN SCALE 164=20'-O" p 0 mm OAF WAtER & SMR INSPECTION-43 RE0 C .42 771-00 F-0-AW ALL HEIGHT CALCS: A=101.83 B=101.18 C=99.75 D=99.75 AVE. GRADE =100,62 ACTUAL=125.00 MAX.=125.62 SURFA(jES M WITHIN DAYS FRANK LICATA PHONE: (425) 775-0968 JIM DRIVEWAY SLOPE L.: (206) 498-5339 �10�0 DRAINS NOT ALLOWED 14% TA o r- I Itu INTO DETENTION SYSTEM LOT COVERAGE LOT AREA= 8389 S.F. HOUSE & DECKS`i 1530 S.F. COVERAGE 1530/8389= 18.2% IMPERVIOUS SURFACES HOUSE & EAVES= lq�45.F. DRIVEWAY & WALK$= 636 S.F. PATIO= 300 ItAc-p-es's . -rcrTAX-= e�c,q 'es., = I Z 94 -LEGAL DESCRIPTION LOT 24, BLOCK 1, PINE ACRES, ACCORDING TO THE PLAT THEREOF, RECORDED IN VOLUME VA ng: DI ATC DAf-_1C C'l *D=f'nDnC EX. CB TYPE I 5."7& AUG cf&TH A\/E. YiE5T (SE 55 =3 CE�#j OF'SNOHOMISH COUNTY, WA. BUILDING DEPT, DATE: 07.30.02 6 t H EIGE T. FILIE ___ I v I H G,OAUC -T- 5LI, Poo t4 wq.R2 Wn o 0464M 'rotcwva �bw Nsm �, % 4e Tt Oro "ir MA% %A r*4. in I jwt RES-% 22- z 01 4 tprw fta %,*jzc A�, % i6 �Iet 241 Nac.%k A IPVA,r hcux--�> -T%C o%oe,o iM %gut%% WA. Qkrf-il Mv P^v cx roor. m T- City of Edmonds Permit No:1J,0(-r3C0 W RIGHT-OF-WAY CONSTRUCTION PERMIT Issue Date: A. Address or Vicinity,pf Construction: g� ONE - B. Typq of Work (be specific): urgil e DRIPM44 E6 Contact: Mailing Addres's: r-1 YPOZZ S7- Phone: ZState License'#: lSel-4;�rld hity Insurance: Bond- $ Er.- Bui-lding Permit # (if applicable Side Sewer Permit # (if applicable): E. F1 Commercial El Subdivision El CityProject [] EUC(PUD,VERIZON,PSE,AT&T,OVWD) F� Multi -Family FD Single Family r_1 Other F. PAVEMENT CUT: El YES 0 G. SIZE OF CUT x CoiqCRETt CUT: El YES _VNO AN'LICANTTO IU,Al) ANI) SICN INDEMNITY. Applicant understands by his/her signature to this application helshe holds the City of Edmonds harmless ftom injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and aitorneyfees by reason ofgranting this permit. THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL INSPECTION AND ACCEPTANCE OF THE WORK. ESTIMATED RESTORATION FEES 47LL BE HELD UNTIL THE FINAL STREET PATCH IS COMPLETED BYCITYFORCES, AT WHICH TIMEA DEBITOR CREDIT KILL BEPROCESSED FOR ISSUANCE TO THEAPPLICANT, + Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by (WAC) 296-155-305 and must have certification verifying completion of the required training in their possession.. + Restoration is to be in accordance with City codes. All street -cut* trench work shall be patched with asphalt or City - approved material prior to the end of the workday NO EXCEPTIONS. + Three sets of construction drawings of proposed work are required with the permit application. CALL DIAL. -A -DIG (1-800-424-5555) PRIOR TO BEGINNING WORK I HA VE READ THE ABOVE STA TEMENTS AND UNDERSTAND THE PERMIT REQUIREMENTS AND ACKNOWLEDGE 11 J_ THATIMUSTMAK T PINK Cod'OF THEEIPERMITA VAILABLE ON SITE A TALL TIMES FOR INSPECTIONS Signa1ure:7:R_:C4 --b I ate: 9-_Ir� (Contractor or Agent) Approved by:. WJM 0 FOR CITY -USE -ON] r4 Lk&�C — !Z / 5 Time Authorized: Void After Right-of-way Fee: 16 4-9 Disruption Fee/Fund Ill: Special in itions: Restoration Fee: LLdw Total Fee: I V Receipt No: 5#5 Issued by: UPON COMPLETION OF PERMITTED WORK, AN ENGINEERING FINAL INSPECTION IS REQUIRED PER CHAPTER 18.00 OF THE EDMONDS COMMUNITY DEVELOPMENT CODE (Phone 425-771-0220, Ext. 1-326) FINAL APPROVAL OF PERMITTED WORK. DATE Inspector's Signature For inspection requirements see Engineering Inspection Information handout. DAMy Qocuments\Forms\Engnimg\ROWpermit—,doc I V Permit No: City of Edmonds RIGHT-OF-WAY CONSTRUCTION PERMIT I.ssueDate: A. Address or Vicinity of B. Type of Work (be specific): It L414-- JK_ Z_ W�: C. Contractor: .k1ailing State License #:— r7 1<�? J r, 4 /7 1_5 D. Building Permit # (if applicable):_3=-067(:�- Contact: Phone: Liability Insurance: Bond: $ 12, coc) Side Sewer Permit'# (if applicable): E. r-1 CommerciiiI El Subdivision El City Project EUC (PUD, VERIZON, PSE, AT& T, OVWD) Multi -Family Fly Single Family n Other fNSPECTOR:. F. PAVEMENT'CUT EINES 140 G. SIZE OF CUT x CONCRETE CUT: F 91 I YES NO A14"LICANT TO IMAI) ANI) Sl(.,N INDEMNITY. Applicant understands by hislher.s.ig�aature to this application helshe holds the Cit� of Edmonds harmless ftom injuries, dam�yges or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City, of - Edmonds or* *any of its departments or employees,'including but not limited to the defense of any legal proceedings including defense costs and attorneyfees by reason of granting, this permit. THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL INSPECTION AND ACCEPTANCE OF THE.WORK. ESTIMATED RESTORATION FEES WILL BE HELD UNTIL THE FINAL STREET PATCH IS COMPLETED BYCITYFORCES, AT WHICH TIMEA DEBITOR.CREDIT 97LL BEPROCESSED FOR ISSUANCE TO THEAPPLICANT Traffic control and public safety shall be in'a.ccordance with City regulations as required -by the City Engineer. Every flagger must be.trained as required by (WAC) 296-155-305 and must have certification verifying completion of the, required training in their possession. Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with Asphalt or City - approved material prior to the end of the workday - NO EXCEPTIONS. Three sets of construction drawings of proposed work are required with the permit application. CALL DIAL -A -DIG (1-800-424-5555) PRIOR TO BEGINNING WORK I HA VE READ THE ABOVE STATEMENTS AND UNDERSTAND THE PERMIT REQUIREMENTS AND ACKNOWLEDGE THATIMUSTMAKE THE PINK C , Y OF THE PERMITA PAILABLE ON SITE A TAL TimEs FOR INSPECTIONS 0 Date: Signature: rY47 A) (Contractor or Agent) FOR CITY USE ONLY Right-of-way Fee: Approved by: :1 414, t u Time Authorized: Void After 11—/ 05 Disruption Fee/Fund'111: Special Conditions: A61W-1Wl'eJ �51 �s�,-Tgptoe_ Restoration Fee: :Cf0fA OA-TU (36W - CgA-TACT MJWS'i'� Tb94 Total Fee: ::�50 I gM V,5� NT5. Receipt No: 2Q2!W 1;2AVJ gf-fAZ &—fW &JENDOMS. Issued'by:, t:;L� UPON COMPLETION OF PERMITTED WORK� AN ENGINEERING FINAL INSPECTION IS REQUIRED PER CHAPTER 18.00 OF THE EDMONDS COMMUNITY DEVELOPMENT CODE (Phone 425-771-0220, Ext. 1326) FINAL APPROVAL OF PERMITTED WORK. M J Ki k DATE-Ilfz�bd Inspector's Signature For inspection requirements see Engineering Inspection Information handout. DAMy Documents\Fonns\Engnmg\ROWpermit—.doc N < 16U -I < P, 00, �-!� DATUM NOTE: TOP OF 3/4' 5TEEL PIPE f COATED I FEET 50VTH OF NN PROPERTY C-ORN1:-R DRIVEN FI-0511 HITH - - -1 FIN15H &RADE. , I R5CSIV50 4 C--64V AUG — 7 2002 BUILDING DEPT. S- ZONE SETBACKS:— ZAVALES DESIGN ASSOCIATESRON MILT ZAVALES SIDE 7. ZDA1243 NE 152nd ST Suite 8 REAR- Seattle, Washington 98155 OTHER (206) 362-2992 q HEIGHT qp1101-011 -,x 4�' J� 54A5'' I 51DE - I APPROVED BY PLANNING PATIO LINE 000 DA0 HEIGHT CALCS: INC. 611TTER A=101.8.3 B=101.18 (r(P) C=99.75 LINE OF D=99.75 OVERHAN& AVE. GRADE =100.62 &ARA&IF I ACTUAL=126.00 2 CWM : 2 I MAX.=125.62 K FRANK LICATA 101-OU PHONE: (425) 775-0968 KDE A.C, ------ -5339 I'Q DRIVEmy CELL.: (206) 498 t MA81 LOT COVERAGE LOT AREA= 8389 S.F. -55, EORE55 AND -IN6 � 1530 S.F. SRZ HOUSE & DECKS UTIL17Y EA6EMENT COVERAGE 1530/8389= 18.2% IMPERVIOUS 8URFACES 12' A5PHALT HOUSE & EAVES= VqIOS.F. OR CONCRETE DRIVEWAY & WALK$= 636 S.F. PATIO= 300 PLAN. 1941 B IKC-ple'515 I -rcrTA\-= -41 so 12.%4 FCVLSS-, =- SITE PLAN LEGAL DESCRIPTION SCALE I"=20'-V' LOT 24, BLOCK 1, PINE ACRES, ACCORDING TO THE PLAT THEREOF, RECORDED IN VOLUME 11 r)r- P) AT-cZ PArZP WA PPrr)Pn-q Ex. 05 TYPE I I I 6E 555.16 CB#i OF SNOHOMISH COUNTY, WA. cf&TH A\/r:. NE5T - — - — — - — - — - — -- DATE: 07.30.02 STRtEET FILE lj� IQ I ),Q 1 3 : 901cl� mry-N 0�1t-loQ-z-,j -V- %--n6 --N-Iamx)lAT 50 Nqw 0 PLANNING DATA NAME: eovl-yy 6-j'"o. DATE: 7/197o2- SITE A RESS: 2- -2- z. - ) - A— PLAN CHK#: PROJECT DESCRIPTION: (2,s-9 REDUCED SITE PLAN PROVIDED?: MAP PAGE: I c74 CORNER LOT: (Yes /ZQ FLAG LOT: Z,ONING:- R.'s 4 CRITICAL AREAS DETERMINATION M. 0 1 El Study Required: U11"Walver UConditional Waiver SEPA DETERMINATION: LJ Fee U Checklist LJ APO list w/ notarized form U (Needed for 500 cubic yards of grading, Shoreline Area- site within 200 ft. of Puget Sound or Lake Ballinger) aftempt ('7,o e4A. .". SETBACKS: Required Setbacks: Street:. -757 Left -Side: -7,5' Right Side: 7.5- Rear: Actual Setbacks: Street: 3o. Left Side: 10. Right Side: Rear: 0-9 Street map checked for additional setback required? (Yes /No / DN Lj DETACHED STRUCTURES: L3 ROCKERIES: L3 FENCES/TRELLISES: L3 BAY WINDOWS / PROJECTING MODULATION: dSTAIRSIDECKS: cr-v� fa,,-o, Ck6uN, ^, PARKING: Required: Z- Actual: LOT AREA: � 3 k,) " 15' "/I� 1kn -- BUILDING HEIGHT: Datum Point: d'c� fowy""'4^4- 0 1,'kL Datum Elevation: too. Maximum Allowed: Actual Height: .2- A.D.U. CREATED?: N Yes) 1-"3' V SUBDIVISION: '�b' an'w"A- LEGAL NONCONFORMING LAND USE DETERMINATION ISSUED: (Yes / nNo OTHER: Plan Review NewBPPIanningDataForm.D0C a W u Ito IWd ULF 60 P\A .--- \ 'pii - IA Z.4- N coo r NMI T A s F r-! -7)V, "17 CID Aer &- &TIM r 0 ;'2 APPROVED A NOTED BY ENGINEERING Date: OWNERICONTRAUOR IS REMSIBLE FOR tZ KCA%) AS'-k 'Ac4'X L-16 C%I. \41Z�5 EROSION CONTROL AND DRAINAGE e\QCA,3-WZA-1�, akg S\71�� T%�v_ VkA AWZ� C69-4,-Qtv%S— RIGHT-OF-WAY CONSTRUCTION PERMIT R v E D AND INSPECTION REQUIRED JU," 1 4 "32 STREE7 FILE 02VEL0 - PMENT SERVICES CTR. CITY OF EDMONDS pj, (:sw DATE RECEIVED (k PERMIT EXPIRES CITY OF EDMONDS USE PERMIT ZONE AMA L44 9MI NUMBER CONSTRUCTION PERMIT APPLICATION JOB SUffE/APT# ADDRESS M 0� - qte+,,,,, Avew OWNER NAMVIAME OF BUSINESS PLAT NAMEISUBDIVISION NO. LOT NO.a LID NO. 15 MAILWQ ADORES LID FEE $ T PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP TESOP App;rcv;o7d RIN Pon so" U_ ZIP ITELEPHONE EXISTING — PROPOSED kapection RAQUIred SWirwalk ft*dred 4_29-;77,_S-- REQUIRED DEDICATION— FT urxwgmumd wiring a NAME ZA METER SIZE LINE SIZE NO. OF FI)(TURES !wM PRV REQUIRED 13 OZ VALIE,� (19 YES NO x ADDRESS q/ V lau '? REMARKS OWNEPICONTRACTOR RESPONSIBLE FOR EROSION CONTROUDRAINAGE -r\.> CrVf -1 Zip TELEPHONE :Mwagoo (bi%agF, L aL A z 6krk (Dr-Iju- NAME.- ENG P REVITD)DATE IC ADDRESS V. VA _ iq it y IDATE REVIEWED BY ZI Z, TELEPHONE 1E 8 A , STATE LICENSE NUMBER EXPIRATION DATE y '�'VARIANCE�Ok.Cu' SHORELINE ORAb&P INSPECTION REOID BOND POSTED Lai rM C3 YES MM40 WO RE\nEW,,-.,'- ION AREA HEIGHT PROPERTY TAX 'P& U� RCEftQ. COMPLETE -.--.EXE4P PROPOSED., 'A 0 WED PROP08ED EXP 0 2-51 NEW R61DENTIW, PLUMBING I MECH COI 'ALLOWED. - 0RQPbS­ REQUIREO'sETsAcK8 _(F6* FRONT' SIDE ':'REAR -'PROPOSED SETBACKS (FT.) FRO LIR SIDE REAR ..ED [3 ADDITION M ERCIAL E3 COMPLIANCE OR 4 75 7 791 CHANGE OF USE [3 REMODEL APARTMENT SIGN PARKING REOD, PROVIDED LOVAREA .. . I PLANNINGREVIEM6Z& DATE I . . I FENCE [3 REPAIR cyos 13 x FT) RElt DEMOLISH El. TANK [3 OTHER . GARAGE *RETAINING WALL 11 [3 Lem S PU i4r" CARPORT R*OCKERY RENEWAL UWE OF USE. B!MOR ACTIVITY).EX": ME r7z.z &9 A. 11— ALI CHECKED BY� TVPEOF , CONSTRUCTION,, CODE, OCCUPANT GROUP NO _?,� a NUMBER OF UMBER,'.OF,: 0 wELU 0,,' �,:� NUNITS I , CRrfiCAI_ AREAS kv, UM IV 0_/ SPECIAL INSPECTOR AREA .�j,jf(p 13 OCCUPANT 00, a STORIES c;L - NUMBEPZ REQUIRED. YES" LOAD DESCRIBE WORK TO BE DONE REMARK PROGRESS INSPECTIONS.PER UBC 108/FINAL INSPECTION REGeD IS . .......... & WcTbt A A Ei� Von --_"rF,_EE Description FEE beqk Anuft yo-0 PE % IluiII P PLANrCHECK NO, 2,,-2q VESTED -DATE- a jilumblAg--y A10I Mechanical THIS PERMIT AUTHOR ONLY THE WORK NOTED. THIS PFaMIT COVERS WORK TO BE DOME ON PRIVATE PROPERTY OMLX ANY CONSTRUCTION ON THE PUBLIC SIDEWALKS, DRIVEWAYS, Grading 122 Recording Fee 3 DOMAIN (CURBS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISI Engr. Review 162P City Surcharge IL PERMIT APPLICATIOft 100 DAYS PERUff LIMM I YEAR - PROVIDED WORK 19 STARTED WFTHIN ISO DAYS EngrAnspection State Surcharge SEE BACK OF PINK PERMIT FOR MORE INFORMATION 'APPLICANT. ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESORS Traffic Mitigation Plan Chk Deposit IN INTEREST, AGREES TO INDEMNIFY. DEFEND AND HOLD HARMLE THE CITY OF as EDMONDS. WASHIN(YrON, ITS OFFICIALS. EMPLOYEES, AND AGENTS FROM ANY AND Fire Review Receipt # ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE. ARISING DIRECTLY OR INDIRECTLY FROM THE ISSUANCE. OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHAIL NOT BE DEEMED TO MODIFY WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE Fire inspection Total Amount Due 0 zi NOR LIMIT IN ANY WAY THE CnYS ABILITY TO ENFORCE ANY ORDINANCE PROVISION.- Landscapelnsp.1 Receipt # I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION THAT THE INFORMWATION GIVEN IS CORRECT: AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF APPLICATION . APPROVAL THE OWNER. I AGREE TO COMKY WITH CITY AND STATE LMS REGUIATING CONSTRUC- CALL This application is inot a perrinit until signed by the M G I TION; AND IN DOI 0 THE WORK AUTHORIZED THEREBY. NO PERSON WILL BE EMPLOYED BWkUng Official or his/her Deputy: and Fees are paK and IN VIOLATIO OF THE STATE OF WASHINGTON RELATING TO gtth FOR INSPECTION receipt Is aclawwledged In space pricirlded. )N N�!LABI N'S N TIONJIfURANCE " RCW 18.27. SIGNATU I R VA EM � �_, DATrEED 16 (425) OFOJIALS SIGNATU DATE J /7— 771-0220 P ED BY DATE ENTION Off 1333 AIA I J A 1A, IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL 771-0221 12 A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI_ CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 ORIGINAL - FILE - YELLOW INSP R FAX PINK - OWNER - GOLD- ESSOR 10/01 RECEIVED AUG 2 0 2-001 . CA 01- 115 Critical Areas Checklist CA File No. %t4e #4�M#Vgq goils/topogTaphy/hydrology/vegetafion) 2 1. Site Address/ Location: 2. Property Tax Account Number: -if�00 / 0 71 tf 0 0 3. Approximate Site Size (acres or square feet): 4. Is this site currently developed? X yes; no. if yes; how is site developed? 4104t 5. Describe the general site topography. Clieck all that apply. Flat less than 5-feet elevation change over entire site. Rolling: slopes on site generally less than 15% (a vertical rise of 10-feet over a horizontal distance of 66-feet). Hilly: slopes present on site of more than 15% and less than 30% ( a vertical rise of 104eet over a horizontal distance of 33 to 66-feet). Steep: grades of greater than 30% present on site (a vertical rise of 10-feet over a horizontal distance of less than 33-feet). Other (please describe): 6. Site contains areas of ;year-round standing water: —IZlr7 Approx. Depth: Site contains areas of seasonal standing water: Approx. Depth: What season(s) of the year? 8. Site is in the floodway --,4 40 floodplain It4o of a water course. 9. Site contais a creek or an area where water flows across the grounds surface? Flows are year-round? Flows are seasonal? /1/0 (What time of year? 10. Site is primarily: forested meadow ;shrubs mixed urban landscaped (lawnshrubs etc) Y&3 -/ . Al 11. Obvious wetland is present on site: F orCity Staff Use Only 1. Plan Check Number, if applicable? 2. Sit6-is-Zoned? oto 0 �1. SCS' %&'.Cnfica1Ajreaoiisi M* Revj6�ed A Date: M V- --61 Howland Homes File W,S.1M0I­';i 16 Pag:e 2 of 10 JU - INTRODUCTION., 'T SERVICES CTR. A. Application. DEVELOPMEA ONDS CITY OF EDM 1 . Applica : Garrett Birkeland fbf. Howland Homes (see Attachment 2) 2. Site Location: 22203'—'96". A�v6*n'tieW. see Attachment 1) 3. Re�ues To divide one lot widi,Approximately 0.41 acres into'2 lots mi a Single-'Famlily Residential RS-8 � zone. 4h6�-�'4)plibaht has iequeisteol' a modification request.; (see Attachment.4) to reduce.- the required 7.5-foot side setback,to� allow the existing! house, on-, proposed lot F to.'remain'in:-its�'currefifj location at. approximately 1334eet from the. side property line, as shown in,Attachmefit�� Sta& makes an- administrative 4. ReviewProcess: Following the, Comment.. Period, Planning decision. 5. Major Issues: a. Compliance with' Edmonds',C6mm*ty Development Code (EQDC) Section 16.20.030, site development standards'fbr�the-RS_8 zone. b. Compliance with Edino�ds,C6mt#iunity Development Code (�CDQ,Section 20.75, subdivision requirements. c. Compliance with Edmonds Co'rrimumty Development Code (ECDC) Section 20.85,' criteria for approval of a.yairiaince. d. Compliance with Edmonds 'Community Development Code (ECDC) Title 18, public works requirements e. Compliance with Edmonds Community Development Code (ECDC) Section 20 95, staff review requirements. B. Decision Based upon the Findings of Fact and Conclusions, Attachments and Exhibits submitted with the application and during the comment period, the following. is the decision of -the City of Edmonds Planning Division: The proposed setback modification 6 DENIED. The Subdivision is APPROVED with -the -following conditions: 1. Prior to recording the applicant must complete the following requirements: a) Complete the Engineering Division.conditions listed "Required prior to Recording'�' on Attachment 5. b) Remove th� portion of the house that is within the required 7.5-foot setback to the &,c Ow - easement. A demolition pernidt is required. c) If setbacks are to be included in the plat, add;to the face of the Plat "Setbacks shown are for reference only and vest no right." d) Add to the face of the Plat "Conditions of approval must bernet and can be found in the final approval for the short subdivision located in File S-2001-116." e) Trees within the setback areas shall be preserved unless required to be removed to accommodate the storm drainage system. Other trees should also be preserved where possible. Any tree may be removed if an ISA-certified arborist states that the tree.is a hazard. f) The storm drainage for this development must meet ECDC 18.30 and Engineering Division approval. Please contact Lyle Chrisman or Don Fiene to determine if the proposed drainage plan may be used, or if stormwater from new impervious surfaces must be pumped to 96th Avenue W. after being detained on site. S-2001-116.doc / December 3, 2001 / Staff Report II. Howland Homes, File No.!S-2001-116 Page 3 of 10 icertificaticin"lioldJ,�'�!,. I j, g) �;,_ '111111 j.. , . 9, Ter,s .�g)r.lbw"ndrs�iniigt;sign!th�lin �pa.� h -4 � armless�a$rpemFqt,, di9taf R 1. 6c� Provide an easement, mamtep4'&'p` a�'g`rieeirnent on: the sh6rCplat., i) Make: sure all aocuments,to-. el recorded meet. -the Snohomish County Auditor% ing..", requirements f6Ttrecordi' j). Subrruitcopies,6fthe do! cume4gto -.be:reco'rde& f6ri the Tlanning Divisioniari,d, Engineering. Divisiofi's. a vat: 0 e,approved,",the: applicant must record'the PpFo nc documents with Snohomish County A I udito r�s omice.- k) Submiv an upd . ated,,c6o..y,,of�the,.fitle.rep.ort, (short plat..c.ertificate) with the,documents., proposed, to be recorded." Subinit: 0 t -d 6h`�tliem, q.,recording number marke !�; , ; u6divisi n to h v� �,be6nW to the Planning 'Division.-" The�,,'City 4ill -not' conside' r, the; s 1 0 a recorded until this is.,done. Compleie'the Engineering Di�ision conditions lisidd "Required with Building Permit" on Attachmefit-5. FINDINGS OF FACT AND CONCLUSIONS A. Analysis of Design: 1. Lot sizes and.dimensions: a) Provosed number of lots:�. 2 b) ReQuired Lot Area (RS-8 zone): 8,000 square feet c) Proposed Lot sizes: Lot 1 Lot 2 Net sq. Gross sg. ft 8,000 9,600 9,389 8,389 d) Reguired Lot Width (RS-8, ione) 70,feet e) Promsed Lot Width: Lot 1 Lot 2 Meets Width Reguirement? Yes, Yes� f) Setbacks: Setbacks should be as follows: Lot 1: Street Setback Q5 feet): Side Setbacks (7.5, feet)-. Rear Setback (15 feet): Lot 2: Side Setbacks (7.5 feet): From the west property line Frorit the south, pT'6pe'rty line and edgi. of the easement From the east property line Fror� all property lines g). Corner Lots: Neither lot will be a comer lot. . h) Flag lot detern-dnation: Proposed lot 2 is considered a flag lot. S-2001-116.doc /December 3, 2001 /Staff Report. I .0 ClfY. F-t6MON'bt, REMENTS- R-PLAT E146INEERING REQ6. �-.Fo­­,­'. SAWSUOMVIM614�� -A r Fi e' c'­.n�S_'O*i--*1 Name: How` hind-jibihes,r.-t'! N YZ e provi ., . . , . , . . : vleiiiitv: th Ap 22203 96... A* V,��.­:, Assist Citv EnRineer date "R 'd eq, prior,, Req "d w/bl -4,.Pos , ted-,.,C6 --t6n� 'lete I mp orecor mg.. P ermit*:, 1 RightS-0 7way bfic streets: � f .-for pu. x 2: Easeffiefits!q,(Cit othef:utilitie§).1 - ,y: uti. ities, pnvateaccess� Provide all easements as needed. x eet.improvements P wiffi-ctirb ,3 Str .1 -andgutter): 7� Access driveway for the short plat shall be 12-.00 feet wide plus x 18" asphalt thickened edge Install 18" concrete curb and gutter along the entire frontage of x short plat. 4. Street -turnaround: Provide an on -site turnaround is -required for lot 2 x 5;.­:'sidewalks and/or Walkways: Construct five-foot wide concrete sidewalk to City standards x along the entire property frontage. � lip - ­.1 1 .. 6'. Street i fits: , ; .. I.. ..:.. N/A` x 7. Planting strip:. N/A x provern nts ,pump.:,. 8. 'Witter, systemArn (piklies;:,* bydr Provide service to each lot. x Connect to public water system x Connect to OVWSD for water in accordance with x OVWSD's Standard Developer Extension Agreement. Sardtary:,sewer: I system im'p ve- ents jr 1`9 , In: pipe 'lines .1 put . up Stations; teleffietering, health district,: etc.):OVWSD Provide new service to each lot x Connect to public sewer system Connect to OVWSD for sewer in accordance with x OVWSD1s Standard Developer Extension Agreement ystern improvem s;:PUM Storm sewer s enO*,(pip6* p Stations. Provide storm sewer service to all proposed lots. x Construct storrn detention system sized to provide adequate x capacity for proposed single family dwellings and access improvements in accordance with ECDC 18.30 and preliminary drainage plan. 11. On -site drainage (plm.p6r Ord. 3013): Connect all new impervious surfaces to detention system. x un w' 12. Undergro d iring, erOid. 1381). Required for all new services x x 13. Excavation and grading�(per URC, Chapter 70): Submit a grading plan as part of engineered site plan. x x 14. Signage (per City Engineer): Fire and aid address sign required for lot 2. x \\Fdmondsfile\])ATA\USERS\chrisman\dvrw\sp\01-1 16plt.do . c ATTACHMENT 5 a ri p or. '-Req'dw/bldg... t '60* g o., re rain -P6 ul`� t ,"d 1 .1 5_ Survey mo Limentation (perOr d'.,: Stai on 12.100120)*. N/A x 16. Ai-*b6ili drawings:(per City Engineer): Required for all utility construction. x x Other r'e*qu'ire ffie-hik"..' N/A x E4gtneenng flees! a) Drainage system design review at $50 per lot x b) Sewer connection charge/LID fees to be paid in full. x c) Drainage system inspection fee. x d) Plan review/inspection fee of 2.2% of improvement costs x plus $250. 9�4,. mpkie �Q.' Authorized for recording by: \\Edmondsfile\DATA\USERS\chrisman\dvrw\sp\OI -I 16plt.doc 9A /0 CITY ENGINEER, CITY OF EDMONDS DATE Date: Hearing Examiner Decision Case No. AP-02-05 & AP-02-06 Page 9 traffic counts from 1995 and 1996,-the improvements proposed or required with this project are appropriate and will adequately mitigate impacts. The main issue at this time on 95th Place W appears to be one of pedestrian safety due to development that occurred in the past before sidewalks were required. One solution to the problem is for the property owners in the area form a Local Improvement District to have sidewalks installed that will have a direct benefit for those who live in the area. DECISION: Based upon the.foregoing findings and conclusions: AP-2001-205 is APPROVED, and condition B. Lb) found in Attachment 4 to Exhibit A is revised to read "No windows or doors shall be allowed on the north wall of the existing house on lot 1.11 AP-2001-206 is DENIED. The decision of the Project Planner to approve the subdivision, subject to conditions, is upheld. Entered this 21st day of March 2002 pursuant to the authority granted the Hearings Examiner under Chapter 20. 100 of the Community Development Code of the City of Edmonds. Ron McConnell, FAICP Hearing Examiner RE G - ON SIDE RA. TION .PEAL N, �:;J ...... "T' d- 'd e,,f6liowingfis�atsurnma"';,,-of-'th'-e.d &v:`� ed lines-,,and,.'p'r o*ce--, f fil it - §�-, L1Wg.-rec 1E y iii"1�11Ad- ,pergdh, pe -A, + 'J a11=g4, .1 X 4 d WF otmati6 owor 4p c 6 PI DISA ti ti'j;, 17' .1 E -S �_ tT��FOR RF-- *,100.olo.G W1 OWS, fIDr the liecring Examiner f6reonside* -'his - decision, wommendationiza"nen r0pest 1SA14widiin ten (W -' in world initial, ftpision-by�m y pemnYdWattends.,the ic hea 1heatt&fi p:Or rin 4, and sigp� 0,ftors4ip, immst.- -'- a m "Or.*S�Atitesfimony orbry7any person holding an �W114COSi011'or recommendaddiL 11he iecoilsi &wraltio "K, -e 4ndings and/or,the criterig'�'c6htg6i-dl"' th e e,brdifia JAQ W*ragm 6 th -r0*itW-ed-. Of 4ppliGafibfi5b�iRg 11 - and� I t DONNA L. BRESKE, P.E. ' 6621 Foster Slough Rd. Snohomish, WA 98290 Phone: 425-334-9980 Fax: 425-334-7380 DETENTION SYSTEM FLOW CALCULATIONS, HEAD LOSS, TOTAL ]HEAD DETERMINATION AND PUMP SIZING FOR FIRSTLINE CONSTRUCTION SINGLE FAMILY HOME CONSTRUCTION 13 DATE: SEPTEMBER 5, 2002 NFcr SITE: 22203 96THAVE W., (EAST LOT) EDMONDS, WA 98036 DRAINAGE - DETENTION - INSPECTION - GRADING & TESC SEWER & WATER FEASEBILITY - SITE DEVELOPMENT 40 .31 FIRSTLINE CONSTRUCTION Design Discussion and Overview: A detention pipe and release orifice was sized by another consultant for a new single family residence to be constructed on the east lot of a 2-lot short plat. Zavales Design Associates show the new impervious area for the panhandle driveway access and house, as 4,150 SF on their site plan. It is below the 5,000 SF threshold, and hence sizing can be accomplished using the city of Edmonds Detention System Worksheet. Due to the topography of the land, the runoff from the impervious area of the existing house on the west lot will also be conveyed to the new detention system. The existing house impervious area is 1,330 SF. It is also quite likely that a detached garage will be on the west lot of the existing house. Total impervious are of the west lot is therefore assumed to be 2,500 SF. Using the Water Works program, a peak flow rate of 0. 12 cfs was calculated for the 100 year, 24 hour storm event for the combined impervious areas of 4,150 + 2,500 = 6,650 SF. This results is a calculated maximum flow of 53.9 gpm. Flows released from the detention system will be pumped up to the drainage conveyance system in 96h Ave. West via 190' of 2" Schedule 40 PVC. The total head determination takes into consideration the elevation difference, length of pressurized pipe, two 90-degree elbows, and one check valve. A total head of 16.4 feet was calculated. PUMP SIZING CRITERIA: MAXIMUM FLOW RATE: 53.9 GPM TOTAL HEAD: 16.4 FEET NOTE: THE TOTAL HEAD AND SUBSEQUENT PUMP SIZING ARE BASED UPON THE USE OF A 299 PVC, SCHEDULE 40 PRESSURIZED LINE. FLOW CALCULATIONS -OR FNSTLINE COMS-rRUCTIcAl' CALC5. 2_22,0? W_ 1/3/0 Deve, Lol 9- 1.5" E�SMT 4 1,50 3 F EL IF Lo �I To I a 6.5 !SoL-Ba�,,'r A -real, Io4co .5*F= C(18 Group v,, j,)f I 111 - /2.4 P;2- use TC 0 Y, 10. Qeferlfior tl- C -.1 1 - 42 1tv 8 La ij e.- o A. Cf ge [a f -7 35. 1 '. it" L 31 7q, 2 �,75"" 0?; z lyc�r(2,) I A -,7 cf .7 2.L To+41 De�e.tiilon Volome 11o'e2. C-P pipe. Equi valer� �n#h_ .--or 2_,� )z . 9/ 5/02 FIRSTLINE CONSTRUCTION, 22203 96TH AVE.W. EDMONDS page CALCULATE FLOW RATES FOR STANDARD CITY DETENTION SYSTEM 100 - YR STORM EVENT BASIN SUMMARY BASIN ID: A10OX NAME: 100 YEAR EXISTING SBUH METHODOLOGY TOTAL AREA ....... : 0.24 Acres BASEFLOWS: 0.00 cfs RAINFALL TYPE .... : TYPElA PERVIOUS AREA PRECIPITATION .... : 3.00 inches AREA..: 0.24 Acres TIME INTERVAL .... : 10.00 min CN.... : 81.00 TIME OF CONC ..... : 10.00 min IMPERVIOUS AREA ABSTRACTION COEFF: 0.20 AREA..: 0.00 Acres CN.... : 98.00 PEAK RATE: 0.06 cfs VOL: 0.03 Ac-ft TIME: 480 min BASIN ID: B100D NAME: 100 YR DEVELOPOESD SBUH METHODOLOGY TOTAL AREA ....... : 0.24 Acres BASEFLOWS: 0.00 cfs RAINFALL TYPE .... : TYPElA PERVIOUS AREA PRECIPITATION .... : 3.00 inches AREA..: 0.09 Acres TIME"INTERVAL .... : 10.00 min CN.... : 86.00 TIME OF CONC ..... : 10.00 min IMPERVIOUS AREA ABSTRACTION COEFF: 0.20 AREA..: 0.15 Acres CN.... 98.00 PEAK RATE: 0.12 cfs VOL: 0.05 Ac-ft *TIME: 480 min purtip fo hw,41e 4is Pow 9/ 5/02 page 2 FIRSTLINE CONSTRUCTION, 22203 96-11h AVE.W. EDMONDS CALCULATE FLOW RATES FOR STANDARD CITY DETENTION SYSTEM 100 - YR STORM EVENT STORAGE STRUCTURE LIST UNDERGROUND PIPE ID No. P1 Description: EQ. LENGTH OF UNDERGROUND PIPE Diameter: . 2.00 ft. Length: 44.80 ft. Slope... : 0.0050 ft/ft 9/ .5/02 page 3 FIRSTLINE CONSTRUCTION, 22203 96TH AVE.W. EDMONDS CALCULATE FLOW RATES FOR STANDARD CITY DETENTION SYSTEM 106 - YR STORM EVENT DISCHARGE STRUCTURE LIST COMBINATION DISCHARGE ID No. C1 Description: RISER & ORIFICE'DISCHARGE Structure: 01 Structure: Structure: R1 Structure: Structure: MULTIPLE ORIFICE ID No. 01 Description: 0.75 INCH ORIFICE PER DESIGN Outlet Elev: 379.00 Elev: 378.00 ft Orifice Diameter: 0.7500 in. RISER DISCHARGE ID No. R1 Description: INFLOW AT TOP OF 241N. ADS TEE Riser Diameter (in): 24.00 elev: 381.00 ft Weir Coefficient ... : 3.782 height: 383.00 ft Orif Coefficient ... : 9..739 increm-: 0.10 ft 9/ 5/02 page 4 FIRSTLINE CONSTRUCTION, 22203 96Th aVE.W. EDMONDS CALCULATE FLOW RATES FOR STANDARD CITY DETENTION SYSTEM 100 - YR STORM EVENT LEVEL POOL TABLE SUMMARY MATCH INFLOW -STO- -DIS- <-PEAK-> STORAGE o(JAW < -------- DESCRIPTION --------- > (cfs) (cfs) --id- --id- <-STAGE> id VOL (cf) Pea k 100 YEAR ..................... 0.06 0.12 Pi Cl 381.09 11 139.29 0, 12 cf-S. FRICTION HEAD DETERMINATION PUMP SIZING 611 - (OK -sr '131'0 2— ca c ula fe ET(,)(,Vct�eI4 110 " 0� :2 // 1� I ve D [cf,, P U C CH f6 vO cc( Vo 0 che( uolue P I q 0 4- 4-6 r—Orl ve(4 C�-s fo ry7 C&- 3 (2 --� S�?c Clow C&- 100 - yr- 12 F7,43 C01 versiol x 72- 4t, 7, a 41 0 A, 0 vi ID I Aere, r) 6 6. 0 Colculoff, �-rl'c�t'or Head F�ropi awl+; Rr;ctim 5(-2e Pc)mP �5 (ri Fee H,eeld in �e.e� rxor 'too LF o� 2/f i2m j) Fu-5F N 6 c(- 3 -02 ZOO Lc% cz C%4 W, --q 0) 9- LAI W I -- CD cla 10 CARRYING CAPACITY AND FRICTION LOSS FOR SCHEDULE 40 THERMOPLASTIC PIPE (independent variables: Gallons per ininote and nominal pipe size O.D. Dependent variables: Velocity, friction head and piess ore drop ppr 100 feet of pipe, inteaor sniouil-i V i c 22 g] 2 6 -d 33 c: 0 ii cl ic wn 0 jZ in S Z 0 mi. 3; 0 280 111 , .1 "T m9Z .3 Im '. H 0 MR Z r" gig m V r V1 r, to x RES S: V i o 0 0 a r) A G &I Z Z ta Z 0 112 IN. W4 IN. I IN. 1-1/4 IN. 1-1/2 IN. 7 IN. 2412 IM 3 IN- 1 1.13: 2-08 ).90 0 * 53 051 0.22 2 2.25. 4.16 1.00 1.26 1.02 0.44 0.77 02-6 0-24 0-44 0.14 0-06 033 0,01 u.'u3 5 5.64! 21.44 13.15 3-16 S.Ta 2.43 1-93 1 ?2 0-15 1.11 0.44 0.19 061 0.22 0.09 0.49 OV66 0.029 0.30 ii.o3q: no Is o.22 O.OIS a.001 7 190; 43.00 0.64 4.43 10.52 456 2,72 311 . 1 37 1,55 0.81 0.35 1.13 O..0 0.17 069 0.11 0.048 0.6 0.051 ' O-W?.3 0.31 0.021 0.009 10 11.29 1 82132 35,51 6.32 20.04 &.6a 3.95 502 Z.61 2.21 1.55 OW $62 0.72 0-31 0.98 O-2t 0.091 0.48 0.09 i 0.619 OA4 0.03 0.013 is 4 IN. 0.40 42.40 ISA9 5.19 1277 S.53 131 1.29 1.42 2-42 1.53 O.5V 1.45 0.19 1.03 0.19 .0.082 9�ge 0.07 0.039 20 osf, nn3 D.013 IZAS TZ 34 31.32 f.?Z 21.75 942 4.4Z 3.59 242 3.23 261 1.33 195 .79 a .33 1.37 0.32 4M.;4 0,24 011 0046 25 0,64: 0-04 Dal? 5 1". 6.65 3283 1422 3.52 9,43 365 404 3.93 1.11 2.44 1 * WISU 1.11 G.49 U. I I . Io 0.17 0-074 30 0.77 GAS 0026 0.49 002 D. 009 11.58 4o" 1995 6.63 IL85 5.13 453 5.53 t.39 290 1.62 0-70 2.05 0-69 ).2: 1.33 0-23 0.10 0-1) 35 0.57 boo 0.0#3 -- 7.73 1576 B-82 5.66 7.36 3.19 341 2.15 0.93 2.39 0.91 a 11.4- 1.55 0 3 1 oil Ap 102 Oil 0.048 005 0 D3 0.013 SA4 MIS 8 1`4 647 11.43 41.013 3.90 2.25 1.19 2.73 1.14 0.50 jjj- O.Z 45 Sn '1. 13 1.28, 0.13 0.16 0.0556 0.069 0.73 0.81 004 0,05 0 -0 1 f 0022 0.59 6 IN. 002 D Dog 994 II.OS ISSO jo.so 10 Al 13�21 127 a be 11113 14.25 5.00 9.17 4,39 4*e A. I. 1:4.. 3.019 �1.42 1.44 1.75 U-62 016 1.99 2-21 U.'51) 0.60 .17 0.22 0.26 W 1.531 0.22 0.0-0 0.9? 0.0? O.D3O 0.67 003 0013 910 19.98 965 S.85 �3 a 2.53 4.10 2AS IMT 216 WaS o 31 70 1,191 0.30 0. 13 .14 010 .041 0.79 0 _O4 0011 653 7.32 6 8.82 3.36 3-82 4.79 5.12 3.27 3-71 1.42 1.61 3.09 3.31 1.13 123 0.49 QS5 75 I.9Z' 0.14 0.15 1.22 011 0.048 0.04 005 oan !0 2.05, 0.30 0.16 1.30 013 0 O-A 0.90 005 0.022 IN. 7.110 9.94 4.30 5.41 4.19 SAI 3.53 1.44 0.62 90 2-30 0.41 0.7U 1.46 016 0.059 Sal 000 0.0�16 8.111 1237 5.36 8.15 5.21 2.26_ 3-9B 1.50 0.78 100 2.66. OAS 0-25 1.62 019 0.11112 11.12 0 D8 0.035 0.65 0.03 0012 0.73 15.03 631 8.04 6.33 2-74 4.42 2.18 0.04 125 3.20 0.131 0,38 2.03 T4 T T4 T 0.29 -15�iil -aoin- 0-125 --6 1 T 6 1.41 012 0062 0.01 -091- 0-035 0.015 A -SS 958 4-15 5.52 3.31 1.43 ISO 3.94- 1.22 Q.S3 1 GO 13. 16 D D69 0-04 0017 11) �O 25 341 581 6 ii 4153 2.00 175 4.48 1.63 0.11 2.84 0.54 0 Z35 1.91 0.22 0 OM 1.14 D.055 0024 7.13 6.115 2-67 200 5.11 2.09 OJ30 3.25 060 0.10 22S 818 UZ t.30 017 0030 0 B2 0.02 f U.012 aa3 725 3.40 ZSD k4O 3.15 t36 4.06 1.06 OAS 2-81 0.43 OAS 1.63 0.11 0.048 103 0.035 0.015 12 IN. 11.04 111.93 5.17 300 ?.61 4-41 1.96 4.8? 1.49 0 &1 3 27 061) 0.26 114 0.16 0-069 123 O.D5 0422 3SO 9.95: Sir 5.69-1.25 9.115 3.94 0-79 0.34 2.27 0.21 0091 0.44 O.OW5 0.026 IA1­ D.02 7 0.012 400 113.23 T32 3.20 GJSO 2-40 I.D8 4.40 1.01 1) 44 2.59 0.27 0.12 1.64 0.09 0.039 1.16 O.D4 OMIF 7.31 309 1.34 5.05 120 0.55 2.92 0-33 0.14 1 BG 0-11 0.048 120 0.05 0.022 300 6.112 3.76 1.63 5.62 143 0-66 324 0,40 Oil 7 CA 0.13 0.056 1.45 0.06 0.02B I'so 8.43 3.25 141 4.88 0.55 0.37' 30 6.11 Ola 0-40 0.12 0.21 2.17 2.69 G.t2 020 0-052 0.087 .009 11.24 S.S4 n4oi-49 I i� 63 5.11 2.20 0.95 5.14 0.73 0.32 3.62 031 0.13 1300 9. r2 3.0 P I III 6.9t; will 0 .0 2000 bit L72 0.74 0.73 0. 3 1400a In.27 2,81 1.13 ?.23 1.11 0.49, 3001) ISS 0.67 3300 ':.69 12 2.07 0-90 IaT 2.66 1, .15 11- no 0 Z m 0 0 >Vn 0 w 17- m MI 0 W C) CD 0 io .-1 -4 0 jc Z -0 0 0 w 3q 4-N 4, 9 BE�-04-20702 17: 211 425 641 3335 0 F-irstone C P-Ilmn resistanoe, sminiess sr4 metal part, BUNA-N elast0merS. a Shmt corrosion resistant, 400 series stainless steel. Threaded design. Locknut on three phase modeb to guard against comPD- nent damage an acadental reverse rotation. M Faswriers: 300 series stainless steel. g Capable of running dry without damage' 0 OMPOnelts. a Designed for confiru= cperation, when fully submerged. MOTORS 0 Fully submerged in high grade turbine oil for jubocation and effidentheatIranSfel. All ratings are within the working limits at the Motor. 'Iq M APPUCATIONS Specifically designed for the following uses: • Homes • sewage systems Devvatering!Effluent • Water 'transfer • Light industrial • Commercial appliCatiOns Anywhere waste or drainage must be disposed of quid* quietly and efficiendy, SPEGFICATIONS Pump - Solids handling capab-ililies: r makimum. . Capacities; up +,0 220 GN, - Tod heads: UP M 81 feet. TCH. DisItarge stze: Z' NPT threaded companion flange as ondard. 31 option available but must be ordered seprately. (order no. A 1-3) Temperatum 104OF (400Q continuous 140-F (60cC) interminem See order niumbM on reverse side for spe(* HP, voltage. Phase and Rpms available. FEATURES a impeffer. cast iron, ek=4 *=ic* balanced with pump clut vanes for mechankal seal protection Optiml silicon bronze impeller available. a Casing: Cast iron flanged volute type br rnaximurn efildeM. Designed for easy insmLition on AIO-20 silicle ral. a medmmW Seal: MMN CAMIDEVS. SJUCON CARMDE seakq *z for 2;eft abrasive a Class B insuW011, AD sino!e phase modets Wture capadt0f SMII motors for rrlaY�murrl starting torque - Single phase (60 Hz)' , aujit-in overload with alt,omatic re5at, 'A andh'Hp — 10 SITOW t,j&, 115 V or 230 V IhTee Prot I. Plug. "A to 2 4P — 1413 STOW with bare leads. three phase (60 M' - ove!ioad protection must be provided in stafter Urit, 9 14j4 STOVJwithhare leads. a Designed for Continuous operdrtion: P-imp rartings are w&in the motor rnar,ur,actumrs recommended %voricing limits, can be operate� corrnuousiywithout damagewhen fullv submerged. 53.9 a 3urings: upper CU lu IV'/VCI heavy duty bail bearing M power Cable: Severe duty rated. oil and water resimn'L Ep" W1 on motor end provides secondary moisture barrier in case cf outer jacket damage and to prEvent oil wi&ng. Standard cord is 20'. Optonal len#s ale avaitabie. g Mozir Cover 0-ring: Assures Dositive sealing aci3inst contaminant ;nd oil leakage. s Consult factoTV "or. iriormatiol-- on 575 V models. AGENCY L15TINGS CT,Med to UL 7,78 and MC5A ZZI 108 S=MdaRK GY (xWdj%n itmdwds Auadafian -us Fie #UUSS49 o 4D ,�'j S I er' e-5 )/Z 0- Fump Goulds VUMPS ITTIndustries SER-04-2002 17:22 -COMPONENTS I lye, oesai0on 1 Multi-varte non -dog cast imn im2eller 2 Elemocoat Daim-outside and imidt 3 silicon carbidg vs. silicon :arbide mechaniW seal 4 Stainlpss steel shait 5 High grade wrbine oil 6 AN ball bwdnq heavy duty cle5ign 7 �sea�cable 8 1 0-ring seal DIMENSIONS 7 'All dimensions are in inchm 130 not use for rongruction puMosm) RdTATION 425 541 3835 P. 03,13:5 Sewage Pump 4 3887BHF 3 SIMPLEX AND DUPLEX SYSTEMS Simplex Ejector Systems: are used where drain facilities are below existing sewer lines. Also can be used for septic tank applications. where wastewater must be pumped away from tank for treatment or disposal. —T Duplex Ejector Systems. offer the I 7�'4* necessary safety required by institutipris 61/1 1 I wNch cannot afford an interruptior ICK A K I L— - their sewage disposal systems. MODELS AND PERFORMANCE RkIAGS PERFORMANCE RATINGS (gallons per minute) Flanged Discharcis SeW�Le PUMPS, 2' 500415 ortler No. HP PH I V,tU Kvt Amps. RPM Wt. (tbs.) WS031 IBHF 'A 1 its I i z.4 i 1 3500 WSC3188HF 200 6.9 WS03128HF 6.2 W50511814F iiS 1 14.5 65 'WS05180HF 7200 8.4 WSOS125NF 230 7,6 V90538BHF 4.1 WSOMW 1 230 3.6 WS0534SHF 460 1.3 WSOS378HF 575 1.5 WS0718SHF 11.0 85 41 WSD7128HF 1 230 9.4 WS07388MF zoo WSOMBRIF 230 I.; WS07346HF 460 1.8 VVS07379MF 573 2.2 WS10189HF 200 14 WSIO128HF 13' !3 WS10360mf 8.6 1 WS10328HF '30 1 7.5 WS1034BHF 460 1 3.9 M10378HF 575 311 1 WSISUBW L 1 M 3 230 17.0 1 92 200 '.0.6 �WSIS3$BHF WS153284F 230 9.6 1 W515348RF 460 4.8 1 SI$373HF W M 575 319 WSZO12 HIF M 2 1 3 230 200 12.0 i J10388HF W520 W520329K 220 i 11.6 460 1 518 VieW$20348HF W52037@MF 575 33 orderNo, WS03BHFIWSOSBHF�W$07gmHWSIOBHF�WSISBHFIWS200HFI RPMb, 1 3500 350D 3500 1 3500 3500 3500 110 - - - 88 120 158 - 20 - 62 98 139 - - 25 - 32 74 120 170 204 30 - - 49 101 150 191Q 35 - - 21 82 130 175 40 - - 60 110 159 45 38 88 140 so - j 67 120 55 47 100 60 29 80 is - 62 70 43 75 23 Goulds PUMPS ITT Industries �1 11 TOT�il- P. 03 SYSTEM DESIGN L Va" TYPE J CATCIH BASIN 1"Mm INSTALL: 1.1/zlo plic rok -A(K LOCK RF=LIEFZ- IN 2 4 A D-5% PE, ...... ...................................... ................................. ......... EXISlING G'� 1� IE MIN. CHECK VALVE E EL EV.= 30' 24' DIA. ADS, C K F:7 LDO 0 1,-. 5-f JE 5 -02 8 MIN LAID LEVEL (109 C.F.) REQ'D=89 C.F. 8' ADS 0 0.6ox AEQ--379.2L_�� IE=379.25 0.75* DIA. ORIRCE 2V DIA. ADS TEE PUMP NOTE: PUMP TO BE ADJJSTED TO PUMP 35 GPM OR LESS. nFYM71ON PIPE. - SECTION MERCURY ON/Off FLOAT'f SWITCH SET TO FOR 38100 ON AND 379.90 OFF. 0 HANOOR 4.0' V DIA. ADS 40-35% OVERFLOW IE=381.00 I' PLASTIC CONDUIT TO GARAGE W/ POWER LINE 1- 1/2' (SCH 40) PVC MP PUMP YDROMATIC MODEL NO. \A/ 2-5A -k (SEE NOTE BELOW) OR EQUAL TYPE I CATCH BASIN mom sm wowma INSTALL CATCH BASIN TYPE 1 AND W#W ALL ROOF DOVWNSPOUT TO BASIN. 4-INCH 'PVC SAM FCR BI.DQ FOUNDAMN DROM FoUNDAnoN DRAINS TO INFIVRAl." 70M DETOTION PIPE PER CITY OF 9WO STANDARDS AND PER DETAIL 1. 30 LF. 24! DW AM 04 INSTALL 8' DIA. ADS (N-12). 24f DIA. ADS TEE WIN SUMP PUW HOWT-W" MOM NO. SP-2�— VJ PER DETA& Z .0 I- pLASM MWWT TO GAME W/ D. ;7- D�Wlp�vc 40) LK MZ I "uAirn TO BE TV46HATED IN PROPOSED EAST LOT (OCLWW 15 WM LOT (UAJM 2.106 SF IS E)STING C moW_ THE OMS SQW WaLME THE EASEIM - CUT/fILL WMM r &ujb, CUT = o CU. YDS FILL = 160 CU- R 5- - 0Z__ fMELT(IFJL) = 160 CL 1:�Nx uor Ivu- 4% L4 %;?->-r ea CP C, 41 :3 w Q lul /Z>& .-70 A Sot am�l 6 lw�- &sit, lo 4fW. 5F ................ WOW - [W [�14 (ORTACT"tA4% E U ................ A coordinated utility environment which maximizesjoint utility opportunitiej to provide quality servicefor the'citizens ofEdmonds YOU WILL BE GIVEN A CONFIRMATION NUMBER BY EACH UTILITY ONCE YOU HAVE INFORMED THEM OF YOUR PROJECT, SITE ADDRESS: 011affe Ll 12, C'"— z V, :z # CV(Y / 9 3 Rich Afflem 425-670-3208 DEVELOPMENT SEWCES You will need to provide PUD with a site plan and w.00nflil s ;TR. New Service Questionnaire. PUGET SOUND # ENERGY New er Construction Call to verify gas availability and to coordinate service i n-stall. Department - 1-888-321-7rg You will need to provide parcel number, contact phone number and mailing address. # 72 4? _Z_ You will need to provide Verizon with the location of your Dow Brandley — 425-710-018 project, totalline requirement, and the date in which service is re,quired. A copy of your development plan ma�y be required. # 0 n Aw BROAD01"AND You will need to proved AT & T Broadband with the location of 253-437-6go6 or e-mail: your project, a copy of your development and site plan (digital wa-ope-north@broad1xmd.atLcom copy if available.) The date in which service is required and a list of contact names, phone numbers & mafling addresses. W®r # Steve Dunphy - 42s-774-7769 You will need to provide OVWSD with the survey map of your For awomers in Olympic View Servic e Area site and complete a development information form. THIS FORM MUST BE COMPLETED AND GIVEN TO DEVELOPMENT . . SERVICES STAFF AT THE TIME OF PERMIT SUBA=AL rt MUM EWES - STORM WMAGE/GUNG INSTALL CATCH BASIN TYPE I AND CONNECT ALL ROOF DOWNSPOUT TO BASIN. 4-INCH PVC STUB FCR BM FOUNDATION DRAINS- FOIJNDA11ON DRAINS TO INFILlRAIM TRENCH. (D DETENTION PIPE PER CITY OF EDMONDS STANDARDS AND PER DETA 1. 30 LF, 2e DIA. ADS. INSTALL fl� DIA. ADS (N-12). (D 24! DIA. ADS TEE WITH SUMP PUMP NYDROMATY, MODEL NO. ft W, 3 EMERGENCY OVERFLOW INFILTRATION TRENCH PER DETAIL 2. I" PLASTIC CONDIUT TO GARGE W/ POW LINE i OR UqW' DIA. PVC (SCH 40) PRESSURE UNE To BE TERMINATED IN PROPOSED CATCH BASIN, I GROSS AREA ($F) IMPERVIOUS WWACE (SF) ROOF ROAD/DW AREA (SF) Pams AREA. (SF) 04STINO WERM (SF) (SF) Me" (CF) RECAM PROVIDED 8.3 IB 17 1,M 29200 1,330 3,186* 4,1,50 4,516 4,239, 3.484 680 4.5% 3,470 89 109 0 EAST toT (INUDING 16 EW WEST LOT (EXCLUDING 15! ESMT)_ .9 e. o 0 T4N\u4rl\ll�t— VZA".-r % %%xi .V'rc AL. * Z106 SF IS 06SM C01110WIl "VEWAY. NOIE- THE GROSS sWa FOOTAGEq, THE LOT DOES NOT IMAE IRE EAS004T AFU .WTMtL WANIRM CUT = 0 CU, YDS FILL F=160 CU. YDS � �CUJJ NET(FMILL) w. _160 CU. YDS I NORTH WASHED ROCK 2.01 "mow —AOCEPTABLE-MGHTLINC �-T 10-1--illa MATERK WASO ROCK $OR 36 ;4t;m 14V 12 WHANCOR +0 6. I 4c E)GSTING GRADE 18" MIN. CHECK VALVE Akk 4== P p r7 ELEV.=�LOO 30' - 24,* DIA. ADS, LAID LEVEL (109 C.F.) REQD=89 C.F. .4 42# - e ADS 0 0.60% ,EIIV.=379-00 IE=379-25 0.75! DIA. ORIFICE 24! DIA. ADS IEEE MERCURY Fl OAT TYPE I CAMH SWITCH SET TO FOR 382.00 ON AND 37 .9.0 OFF. PUMP NOTE: TO ADJUSTED TO 2940MMMM PUMP NOlEi To . \\\�w BE Kla::WN'� Tll SECTION DE 6 4.0' 4" DIA. ADS 410,35% OVERFLOW IE=381.00 I" PLASTIC CONDUIT TO two "a rn GARAGE W/ POWER UNE 1-1/2' (SCH 40) PVC SUMP PUMP HYDROMATIC MODEL NO. (SEE NOTE BELOW) OR EQUAL TYPE I CATCH BASIN I CMSTMJCT40N KWOTES — STORM 0 MAfiE/WWG (DINSTALL CATCH BASIN TYPE I AND CONNECT ALL ROOF D0WNSPO(JT TO BASIN, 4-INCH OV0 STUB FCR BWG. FOUNDATION DRAINS. FOUNDA71ON BRAINS TO INFILIRATION WXCH. DETENTION PIPE PER CITY OF EDMONDS STANDARDS AND PER DETAIL 1. 30 LFj 24! DIA. ADS. INSTALL 6" DIA. ADS (N-12). 24! DIA. ADS iff NIH SUMP PUMP NYDROMAX MODEL NO. MAR* -31eicc-.n �� W�= 4_-� EMERGENCY OVERFLOW INFILTRAIN 1RENCH PER DETAIL 2. I" PLASTIC CONIJIUT TO GARGE W/ POW LINE i OR 42#0 DIA. Pvc (SCH 40) PKSWREAE To BE TERMINATED IN PROPOSED CATCH BASIN. ez-1 'o 11 GROSS AM (SF) ROW ROAD/DW AREA (SF) s W"A Dim IMPEMS (SF) (SF) DmTo (CF) RE4M PROVIDED EAST tOT (INCLUDING IV ENT) 9,3a 9 1*950 Z200 4,150 4,239 680 3,470: 89 109 wmT LOT (EXODINQ i S' ESM� 94,00 1 1.330 3,186" 1.40 1,511 * Z106 SF IS OWN COOM MWMY- NOM JK OW W ,dAAE FOOTAGEDF X LOT DOES NOT I INCLUDE TH T AREA, WTMLL QUANIRM CUT 0 OU, YDS FILL 160 W. YDS NET(R I - 160 CU..PJS I ;v a ORTH I WHED RON WMLL ........... 2.6 --A=PTA LE MATERK. Wift ROCK Ign 35 U AA Aji 2 0 HANOW f ?"kip 6.0' 4.0V EXIING GRADE 18* MIN. FCHECK VALVE V DIA. ADS GD-35% E: OVERFLOW P J, ON WWAO" ELEV.-381.9bo- 3 30- ,2 " DIA. ADS, IE=381.00 - reo AO'_2 IL" D h, L LAID L (109 C.F.) 89 all 1* PLASTIC CONDUIT TO 89 C.F. GARAGE W/ POWER LINE 42 e-ADS i�x IELEV.=--3179.0 1-1/2' (SCH 40) PVC 7 IE=379 �25 SUMP PUMP HYDROMATIC O.V DIA. ORIFICE MODEL No. V;t�� 3's817 %%\i-- (SEE NOTE BELOW) W DIA. ADS TEE OR EQUAL TYPE I MER A OAT TYPE I CATCH BASIN SWITCH SET TO FOR 382.00 ON AND 379.9.0 OFF. PUMP NOTE: MP PUMP TO BE ADJUSTED TO PU DEMION PIPE.— SEc*nON �-Y)oc I Ld 1.1 pr �01 > YISD) //Z_ Vo L q M 1�:45T Lc)T 7-11 /A/ 4)j Fo 0 (:S"ym e; A5 )/v L_-5 e 3 7 7 5- 'Lo 7,* Jew PF, D 5 - 63 �Ta_3) 7 11