Loading...
22319 76TH AVE W (2)�2Z319 7(olh Rt)r- Q SNOHOMISH CO. Serving Brier, Edmonds, and 12425 Meridian Ave S Mountlake Terrace Everett, WA 98208 FIRE r Phone (425) 551-1200 DISTR r www.FireDistri.ctl.org Fax (425) 551-1272 FREQUENCY STATION & SHIFT LOCATION: 2231976th AvenueW 98026 2016* 20-D BUSINESS NAME SCHEDULED Edmonds Landscaping PHONE: 4257756427 DATE DUE 0 Mar 2016 MAILING 7 ADDRESS: 22319 76th Avenue W, Edmonds, WA 98026 F� - BUSINESS OWNER: Hopkins, Shaun HOME PHONE: EMERGENCY-1: Kosic, Marko HOME PHONE: 4257701001 KEY ACCESS-2: HOME PHONE: EMAIL: _!5r_4a24qAQ4 9 PERSON CONTACTED: NAME OF INSPECTOR: IA!��4 FIRE SYSTEMS: FE 03/13 n.qtp I qQt.qPr%/irPH* Vlt- FIRE PREVENTION INSPECTION REPORT FDMONDS BRIER 0 MOUNTLAKE TERRACE 0 UNINCORPORATED CURRENT CITY YES NO BUSINESS f;71 LICENSE v2w., INITIAL INSPECTION DATE V_ 11—IL .HAZARDS FOUND AND LOCATIONS COMMUNICATIONS 2' jr,ly2e &jr, 1W 04 14,2 7-W gU le n '&'tr 2 - 3 3 4 4 5 5 6 6 7 7 I AGREE TO CORRECT -THE ABOVE VIOLATION(S) IN THE NEXT 30 DAYS X lst RE -INSPECTION 2nd RE -INSPECTION EXTENSION FINAL RE -INSPECTION VIOLATIONS DATE DUE: DATE DUE-.' GRANTEDTO: DATE DUE: CITED: PERSON PERSON CONTACTED: PERSON ,EONIACTED: CONTACTED: INSPECTOR: VJIJU *60A,& INSPECTOR: INSPECTOR: 2 DATE: Cl _2� DATE: DATE: 3 VIOLATIONS I LL C' IV," heu ftvu VIOLATIONS 5 PRE -CITATION CITATIONISSUED 4 LETTER SENT NUMBER: CODE 5 2 6 DATE: SECTION: RETURN RECEIPT 7 RECEIVED DISPOSITION: 8 J�o 4 DATE: 7 ETTER NEEDED [] YES t � LETTER NEEDED YE� N�' 8 .10 FIRE PREVENTION Sem,inQ Bilei: Edmonds 12425 Mei-idian Ave S INSPECTION REPORT SNOHOMISH CO. Mountlake Terraceand Everett, WA 98208 EDMONDS E I BRIER I.FIRE the Town of Woodway DIST 'FT Phone (425) 551-1200 OWOODWAY 0 MOUNTLAKE TERRACE www.FireDistrict1.o'r'g-. Fax (425) 551-1272 0 UNINCORPORATED 0' FREQUENCY TATION & SHIFT') LOCATION: 22319 76th Avenue w 730 2. A BUSINESS NAME: Edmonds Landscaping PHONE: 4257750427 SCHEDULED DATE DUE 0 03/01/13 MAILING '22319 76th Ave W LIFIR 0 591 3-107 ADDRESS: Edmonds 98026 BUSINESS OWNER: HOME PHONE: 4257419096 ACTIVE EMERGENCY-1: Hopkins, Shaun HOME PHONE: 4252327767 eCURRENT _"N KEY ACCESS-�: Kosic, Marko HOME PHONE: 4257701001 CITY YES NO BUSINESS El El LICENSE PERSON CONTACTED: INITIAL INSPECTION DATE G/lb /�5 NAME OF INSPECTOR: "I-'D CPL-11 Q 0�11 1 FIRE FE S I � -2D SYSTEMS: ANNUAL HAZARDS FOUND AND LOCATIONS COMMUNICATIONS 2 2 3 3 4 4 5 5 6 6 7 7 I AGREE TO CORRECT THE ABOVE VIOLATION(S) IN THE NEXT 30 D,AYS X 1st RE -INSPECTION DATE DUE. 2nd RE -INSPECTION DATE DUE. EXiENSION GRANTED TO: FINAL RE -INSPECTION DATE DUE: VIOLATIONS CITED: PERSON CONTACTED: PERSON CONTACTED: PERSON CONTACTED: 1 INSPECTOR, INSPECTOR: INSPECTOR, 2 DATE: D E: DATE: 3 VIOLATIONS 1 5 VIOLATIONS 1 5 PRE -CITATION LETTER SENT CITATION ISSUED NUMBER: 4 2 6 2 6 DATE: CODE SECTION: 5 3 7 3 7 RETURN RECEIPT RECEIVED 6 4 18 4 '8 DATE: DISPOSITION: 7 LETTER NEEDED E] YES El NO LETTER NEEDED [] YES El NO 8 FIRE DEPARTMENT COPY C ITY OFEDMONDS 121 5TH AVENUE N. - EDMONDS, WASHINGTON 98020 (425) 771-0215 FIRE DEPARTMENT LOCATION: 22319 76th Avenue w BUSINESS NAME: Edmonds Landscaping MAILING 22319 76th Ave W FIRE PREVENTION SAFETY SURVEY PHONE: 4257750427 ADDRESS: Edmonds 98026 BUSINESS OWNER: HOME PHONE: 4257419096 EMERGENCY-1: Hopkins, Shaun HOME PHONE: 4252327767 KEY AC.CESS-2: Kosic, Marko HOME PHONE: 4257701001 FREQUENCY STATION& SHIFT 730 1� 20 C SCHEDULED 3/ 01/11 DATE DUE 11 UFIR o. 591 3107 ACTIVE lo INITIAL INSPECTION DATE PERSON CONTACTED: �API�V_a V-,U 4_, 1 C_ NAME OF INSPECTOR: A 15-�- -r7 - if FIRE FEW51 SYSTEMS: t-,) ( JN, ANNUAL HAZARDS FOUND AND LOCATIONS COMMUNICATIONS ENTER CODE ONLY ONCE I� VIOLATION CODE 2 2 3 3 4 — ----- 4 5 6 6 7 __ 7 8 8 lst RE -INSPECTION 2nd RE -INSPECTION EXTENSION FINAL RE -INSPECTION VIOLATIONS GRANTED TO: CITED: DATE DUE: DATE DUE: DATE DUE: . . PERSON PERSON PERSON . . ................. . ... CONTACTED: CONTACTED: CONTACTED: IN SP E CTOR- INSPECTOR INSPECTOR: 2 DATE: DATE: DATE: 3 VIOLATIONS __V�TIONS PRE -CITATION CITATION ISSUED 5 1 5 LETTER SENT NUMBER' CODE 2 6 2 6 DATE: SECTION: RETURN RECEIPT 6 3 7 3 7 RECEIVED .— 7 - Di . S . P I OSITION: 4 18 4 DATE, LETTER NEEDED E.] YES E] NO LETTERNEEDED Ei YES 8 FIRE DEPARTMENT COPY MEMORANDUM Date: September 15, 2007 To: Development Services Lead Marie Harrison JAI From: Fire Marshal John J. Westfall 425.771.0213 Subject: BILD20060977 Edmonds Landscaping 22319 76 1h Ave W The following project has been evaluated under the 2003 International Fire Code and the Edmonds Community Development Code. 1 ) Provide building addresses for structures on site plan. Contact Development Services for approved addresses. 2) Site plan shows both OFFICES existing. Which is COU? 3) Indicate occupancy types and area for each structure on site. 4) How is access made to EXIST. GRAVEL PARKING? Show access from East, as I applicable. 5) If not applicable, Fire Department access roads shall be provided for every building extending to within 150 feet of all portions of the exterior walls of the first story of the building as measured by an approved route around the exterior of the building. From previous records, rear STORAGE BUILDING is likely in excess of this 150' dimension and lane width is less than required 20'. Provide fire access or alternative fire protection provision. 6) What are the materials, quantities, and equipment being stored in STORAGEs? 7) Indicate fire hydrant locations from north and south approach on site plan. Hydrants are required to be spaced every 300' 8) Sheet A3 provide 2A:10B:C minimum rated portable fire extinguisher inside main entry/exit. Cc: Applicant Mr.Warren LaFon, WLA, wa rrenlafon(cDearth I ink. net Assistant Building Official Ann Bullis City of Edmonds �b Fire Marshal Westfall, John From: Westfall, John Sent: Saturday, September 15, 2007 1:10 PM To: Harrison, Marie Cc: 'warrenlafon @earthl ink. net'; Bullis, Ann; Smith, Mike Subject: BLD20070935 Edmonds LS 22319 76 Ave W.doc Marie: Will you verify cc email for Warren and forward as rqrd? Thank you, John — -31 BLD20070935 Jmonds LS 22319 7. Westfall, John From: Westfall, John :-' 1 - . Sent: Saturday, September 15, 2007 12:57 PM To: 'Harrison, Marie' Subject: Boka 22319 76th Ave Marie: Bldg & Fire records show COU for SFR to OFFICE in 1997. Should this address be 22313, or do you think they gave the wrong address before? I've edited, reattached and resent the comments previous for site plans that weren't address with 9/12 submittal. John , Date: To: From: Subject: MEMORANDUM August 10, 2007 Ift 2- A-0 b Cc -4 0-7 - 13 S— Development Services Lead Marie Harrison Fire Marshal John J. Westfall 425.771.0213 BLD20060977 Edmonds Landscaping 22319 76 th Ave W The following project has been evaluated under the 2003 International Fire Code and the Edmonds Community Development Code. 1) Provide building addresses for structres on site plan. Contact Development 1W Services for approved addresses. 2) Site plan does not scale to 1/8" = 1'0". Correct measure. 1 (11. " a a,.- 3) Indicate occupancy types for each of the structures. oe 4) Storage buildings and south OFFICE are new indicated on site plan. Fire Department access roads shall be provided for every building extending to within 150 feet of all portions of the exterior walls of the first story of the building as measured by an approved route around the exterior of the building. From previous recorrds, rear STORAGE BUILDING is likely in excess of this 150'dimension and lane width is less than required 20'. Provide fire access or alternative fire protection provision. 5) What are the materials, quantities, and equipment being stored in STORAGEs? 6) Has south. OFFICE (22319?) been approved for COU? 7) Indicate fire hydrant locations from north and south approach on site plan. Hydrants are required to be spaced every 300' 8) Sheet A-3 Call out on plans and post OFFICE address on structure (west elevation). Cc: Applicant Mr.Warren LaFon, WLA, warrenlafon(a-earthlink. net Assistant Building Official Ann Bullis City of Edmonds Sb Fire Marshal 7 / TIv Westfall, John From: Sent: To: Cc: Subject: Fire Dept comments C BLD200600977 bmonds LS 22319 Westfall, John Friday, August 10, 2007 6:05 PM Harrison, Marie Bullis, Ann; Smith, Mike; 'warrenlafon@earthlink.net' BLD�00600977 Edmonds LS 22319 76 Ave W.doc f Pre -application meeting February 19, 1999 — 9:00 a.m. Applicant: Rich Fulcher Site Address: 22319-76"' Avenue West, Edmonds Landscaping — Shop & Parking Attending: Representing City Staff- Steve Bullock, Jeff Wilson, Jeannine Graf, Jamal Mahmoud, Gordy Hyde, John Westfall, Conni Curtis.. Representing _AI2121icant: Rick Fulcher, Marko Kosic Jeff explained the purpose of the meeting and asked each City representative to give a brief rundown of what they saw in the preliminary plans, with the Applicant being able to ask questions following the comments. Planning � �eve): Meg worked on the original permit and left me some notes on her review. Is this long narrow building on the east side of the property the one you're planning to add a second story to? Applicant replied affirmatively. Meg put together a list of comments for you. I'll go through it and highlight some of the things that I think will be critical as you go through the process. This is going to be what we consider a minor project for design review. It will go before the Architectural Design Board (ADB), but I don't think you'll have any problems meeting the standards as far as height, proximity to the property line and things like that. The biggest issue is that when it originally went through the design review process, it was allowed to go right up to the property lines with no perimeter landscaping because there is a fence outside that basically screened the view of it. However, if you're going up another floor, the ADB may have some concerns. Then again, they may not since it is adjacent to some commercial sites. So one of the things you're going to want to be prepared to talk about is the context that this building is in — is it adjacent to multi -family or is it adjacent to a gas station? And depending on what it is, you may feel it's legitimate to locate it right next to the property line, with no trees or anything to soften the mass of it. Parking probably shouldn't be a big deal since it is a storage facility. It appears that no SEPA is going to be required. I have no further comments, so I'll give you a copy of Meg's notes. Engineering ic circulation, and _CJ—amao: I understand that you have an approved plan showing the traff that you have two driveways, one from the south side, the other from the north side, both of which are 11 feet wide and are each one-way. I met you on the site, and you told me that you would like to have a 22' driveway from the north side of the building. Applicant: The main question I would like to have answered here today is, "Is our ingress and egress going to preclude usfrom doing this secondfloor? What is the use of the second floor? Applicant: Storage. Are you originating more trips by having the second floor and if not, why do you want the second floor? Applicant: For the space — as it stands right now what would go into that secondfloor gets crammed in down below — wejust need more space. We're not planning on increasing in terms of trips and employees. Just bear in mind that if you want to expand the north driveway, you need to get an easement from your neighbor, and it is requir . ed before approval. Applicant: You're telling me I need an easement? No, I'm saying if you are proposing expansion of the north driveway, you need to have an easement; if you are not proposing that, the existing driveways are probably sufficient. This is based on the fact that the second floor will be storage only. Applicant: Yes, there will be no people working in any of this area — bothfloors are storage. People will go in to get out ofstorage what they need and that's all. Applicant (Marko): Iprobably can talk more about this, because I am in charge of thesefacilities more than anything else. Most what will be stored in thesefacilities are mowers, plus additional tools like shovels, rakes, the like. Right now we are rentingfour additionalfacilities in Shurgard, just to store this stuff, so we hope to put all the stuff in our buildings. Gordy: Maybe to clarify for Jamal's benefit, the Planners indicated to me yesterday that there is no additional parking demand with the storage building so the asphalt area that's their back yard will not be striped for parking; therefore, we can make a logical assumption that because of this there is no additional demand. The trucks that come and go there are their existing trucks. Jeff: So, Gordy & Jamal, just to be clear, they've got one-way ingress on the south side and then the one-way egress on the north side? Jamal: That's correct. Jeff. And how large are the Page 1 Pre -Application Meeting February 19, 1999 Rick Fulcher/Ednionds Landscaping existing ingress and'egress roads? Jamal: 11 feet wide on both sides. Jeff. And that's adequate for the one-way? Gordy: That's been approved with the first phase. Jeff. The parking for the storage building is based on the number of employees — if the number of employees doesn't change, that's why there's no additional parking required. Jamal: Be sure that you have three parking stalls in front of the building. Building_G&�nnine): Pole buildings are required to be designed by State of Washington licensed professional engineers. Since you're getting your plans from the Midwest, you'll have to give those plans to a local engineer to review and stamp. Pole Buildings are non -conventional construction. Applicant: I had Ed Baker stamp a letter saying that the building below will support the pole building, but are you saying that I need something more? A state of Washington licensed engineer must stamp the pole building plans. We would require a list of equipment or supplies that will be stored in the pole building. If flammable liquids are stored, you have to provide the type and quantity. Applicant: You're talkingjust in the upperpart — the pole building only? Yes. You need to refer to LJBC Table 5A for opening protection requirements to property lines and exterior bearing wall protection. We also need a lighting budget. That would be all of our comments. Jeff. Do you have any other questions? Applicant: I've gathered up the information I think I need to submit to the ADB, and would like you to review it with me. My biggest question was on the elevation drawings. I need to know what more detail will be required. Steve: You need to call out your materials — what you're going to be using for the siding, the roofing, etc. If you can put it on the elevation drawings it's going to strengthen your case because you're showing more accurately what it's ultimately going to look like. That's the reason it's before ADB — to determine what it will look like. Applicant Do you think it would be appropriate if we attach some of the brochures for the pole building? Steve: Yes,that's very appropriate. Gordy: I don't think that Engineering will even review it from ADB, given the.status of storage and no change in parking regulations, etc. Steve: Regarding the landscape plan, it'll be somewhat up to the applicant to propose something. I understand that right now there is no change in the landscape plan from what they originally proposed. They will need to articulate why they don't believe they need landscaping now that the building is taller. The ADB may then say with it being that close to the property line, they think it does, but that's just something the applicant needs to prepare themselves for. So they may want to submit something of that nature in writing as part of the original application; then they can get a chance to vocalize their comments at the meeting. Fire ( John : You're right at that point where we asked for 150' by the code by an approved route to the far end of the building on the first floor, and we're really pushing that. In fact, it's probably 152' — 15 3'. With the second story, I'm a little concerned — it isn't just a brick building — now there's going to be more to it than that. What can We do on your building to improve our response or to improve the fire protection or to reduce the distance that it takes the Fire Department to protect your property? What I'd like to see is some automatic detection — you could have heat detectors down below to protect the area where the maintenance will be done and you could have smoke detectors up above. You are really over the access requirements meaning that we can't get our fire engine past the front of the house conversion. I'm willing and open to listen to other suggestions that you might have arranging your project as such, but it is over the 150'. Applicant: Our neighbor to the north is also zoned commercial and runs a business out of that property. He has plans to build a shop in the back, somewhat the same idea as what we have. As it exists, he has a garage that comes to the property line, and there's 18'from the corner of our office to his garage. He'splanning to eliminate that garage at the time that he builds in the back. I'm wondering if 18'passage is enough to get in. Then, long term when that garage is out of the way, there'll be 22'. John: So you'd be sharing a means of access? Applicant: We won't be sharing it but in reality there's that much space — that's his way in and out of his property, immediately adjacent to ours. John: I'll look again at the site and specs and will get back with you on this. CAMy Documents\Engsec\DEVELOP\Pre-AppMtgs\PreApp2.19.99. Ldoc Page 2 -i Pre -Application Meeting February 19, 1999 Rick Fulcher/Edmonds Landscaping Note — Follow-up from Fire Department: Fire Department will not requirefire detection system due to distance Of Fire Department access to storage building. Instead, Fire Department will assure that access lane to north, which is attached to neighbor, will be made availablefor apparatus as the neighbor develops and similarly adds another back building. CAMy Dmuments\Engsec\DEVELOP\Pm-AppMtgs\PreApp2.19.99. Ldoc Page 3 i Plans #0,6, Fire Department Review Project type Fire -Flow (UFC Appendix III -A) Building type: \ tv Fire area: 1�7L_ square feet 4-hour area separation wall? 00 Type I or Type 11-FR Construction? Modifications: Increase or Decrease? .5 - 3 8 1-D& 7, 3 \ c� Fire -flow is gpm for hours. R3 dwelling reduced %for auto sprinkler? (min. 1000 gpm) All other use reduced % for auto sprinkler? (min. 1500 gpm) Total fire -flow: 1560 . gpirn for _I— hours. Fire Hydrant Locations and Distribution (UFC Appendix 111-13 & 19.75.150 ECDC) Min. # of hydrants: Ave. spacing: SCO Max distance to frontage: (ur-c:� WD Dead-end road? Highway dividerlobstructions? Single-family residentially zoned area? (600'apart): Other zoned areas? (300'apart): 01r— Existing hydrant distance to frontage: North 1,_7 �_ feet. South ' ( 0��' feet. East feet. West feet. # of hydrants required and text location(s) Fire Protection/Detection system & other rqrmts (UFC & ECDC 19.75) prt-M6,J�-- P1,46 ? __.1 Arcof,5,5_ P-09MTS 07q= Z I 1� � �9� Reviewer: Review Date: Z/ P, 06. A�tfall, John To: Curtis, Conni Subject: PA 99-03 Fulcher Edmonds Landscaping Follow-up to subject pre-app meet is that FID will not require -fire detection system due to distance of fd access to storage building. Instead, fire department will assure that access lane to north, which is attached to neighbor will be made available for apparatus as the neighbor develops and similarly adds another back building. � * Westfall, John From: Gruwell, Meg Sent: Thursday, February 18, 1999 2:16 PM To: Chave, Rob; Hyde, Gordy; Mahmoud, Jamal; Graf, Jeannine; Westfall, John Cc: Miller, Raymond Subject: Edmonds Landscaping Preapplication Meeting I wanted to pass along some information I just received from Rick Fulcher of Edmonds Landscaping who has a preapplication meeting scheduled for tomorrow regarding his site at 22319 - 76th Avenue W. His proposed project is to construct a 12- by 48-foot second story on top of the existing permitted building at the rear of his lot. The structure will be a pole building, 8 feet tall. No employees will work in it: it is just for storage. The question he is most interested in finding out about is whether he can get a building permit for the second floor addition with the ingress and egress provided to the rear yard in his approved permit for the first story. Because the proposed structure is so minor that we would typically not have a preapplication meeting for it, I have suggested he go ahead and come to the preapplication meeting and just discuss the question above. I have not requested the plans for the building. From Planning's perspective, with no employees in the new unit, he would have no additional parking requirements. Mr. Fulcher believes that he has gotten the run-around, and been given different answers by different people here in the city, so I can see why he would want to have a preapplication meeting to confirm the access issue. Please come to the pre -application meeting prepared to answer the question: Can he get a building permit for his second floor addition with the ingress and egress to the rear yard shown in the earlier permit? If anyone has major heartburn with this approach, please get back to me today at extension 330. Thank you.