December 11, 2001
HWA Project No. 2001202
C&H Construction
PO Box 75493
Seattle, Washington 98125
Attention: Mr. Dick Cro nin
I
I
I
I
I
I
I
I
I
I
I
I
I
I
U
fWAGEOSCIENCES INC.
19730-64TH AVE. W., SUITE 200
LYNNWOOD, WA 98036-5957
TEL. 425-774-0106
FAX.425-774-2714
www.hwageosciences.com
Subject: Final Letter on Construction Materials Testing pd Observation Services
OftBackfill n. oor- *mming Pool, Anderson Residence
rd g
@-93* J=onds, Washington
Dear Mr. Cronin:
HWA GEoSmNcEs INc (HWA) performed periodic construction observation and laboratory
testing for the above referenced project: The specific issues addressed included suitability of
selected backfill materials and compaction of structural fill materials. Attached are copies of test
reports generated during the course of this project.
Prior to backfilling, a sample of Type 17 mineral aggregate from Glacier Sand and Gravel was
provided to HWA for Laboratory Compaction Characteristics testing (ASTM D 1557, Modified
Proctor) and grain size distribution testing (ASTM C 136), as detailed on the attached reports,
Figures I and 2. The submitted material is considered suitable for use as structural backfill based
on the low fines content and well -graded particle distribution.
During backfilling, intermittent site visits were made by WA inspectors to monitor the progress
of the material placement and compaction. The backfill was placed in approximately 6" thick
lifts and compacted to a minimum of 95% of Modified Proctor in accordance with our
recommendations, as confirmed by field observations and field density testing (see attached Daily
Field Reports). . J
To the best of our knowledge, all the items observed and tested meet the
project.
Sincerely,
HWA GeoSciences hic.
Richard McKinley
Manager, Materials and Construction
Services Group
RM:rm
Lome Balanko, PE - 3/
Principal Geotechnical Engineer
GEOLOGY
GEOENVIRONMENTAL SERVICES
HYDROGEOLOGY
GEOTECHNICAL ENGINEERING
TESTING & INSPECTION
LABORATORY COMPACTIONCHARACTERISTICS OF SOIL
(ASTIVI D 698, ASTM D 1557, ASTIVI D 4718) U=1
CLIENT: C&H Construction HWAGEOSCIENCES INC.
PROJECT: Anderson Residence, Swimming Pool Backfill SAMPLE ID: S-1
PROJECT NO: 2001202 Sampled By: Client . Tested By: E.S.
Date Sampled: 11/26/2001 Date Received: 11/2&2001 Date Tested: 1112912001
MATERIAL TYPE OR DESCRIPTION: Type 17 Mineral Aggregate
SAMPLE LOCATION AND DEPTH: Glacier Sand and Gravel Stockpile
Standard: [--JD698
Method: F]A
Preparation: [X] Dry
FX-� D1 557
F-1B
F] Moist
Natural Moisture Content: 3.6 %
FRI c Oversize: 19.8 % retained on: 3/4 in.
Rammer:E]Auto [-]Manual Assumed S.G.:- 2.65
Test Data
Dry Density (pco
122.7
124.9
1 124.4
1 122.5
1
1
Moisture Content (%)
3.6
1 5.3
1 7.9
1 9.4
1
Data Summary*
Percent Oversize
19.8%
Max. Dry Density (pcf)
131.5
Optimum Moisture M
5.2
Test Values At Other Oversize Percentages
0.0%
5.0%
10.0%
15.0%
20.0%
25.0%
30.0%
125.2
126.7
128.3
129.9
131.6
133.3
135.1
6.2
5.9
5.7
5.4
5.2
4.9
4.6
- �iues cuffecxea ror presence or oversize matenau Reviewed By: FIGURE I
This report applies only to the items tested, and may be reproduced in J/Wth written approval AHWA GCOSCIENCES INC.
SAND
Coarse Fine Coarse Medium Fine SILT CLAY
SYMBOL
SAMPLE
DEPTH (ft)
CLASSIFICATION
% MC
ILL
PIL
PI
% Gravel
% Sand
% Fines
0
S-1
(GW), Glacier S&G Type 17 Mineral Aggregate (well graded GRAVEL with sand)'
4
57.1
41.2
1.8
HWAGRSZ 2001202.GPJ 11/29101
SWIMMING POOL BACKFILL GRAIN SIZE
ANDERSON RESIDENCE DISTRIBUTION
22510 - 93rd PLACE WEST TEST RESULTS
HWAGEOSCIENCES INC EDMONDS, WASHINGTON PROJECT NO.: FIGURE:
SWIMMING POOL BACKFILL GRAIN SIZE
ANDERSON RESIDENCE DISTRIBUTION
22510 - 93rd PLACE WEST TEST RESULTS
HWAGEOSCIENCES INC EDMONDS, WASHINGTON PROJECT NO.: FIGURE:
FIELD REPORT
19730-64th Avenue West
Job No. Page No.
JHW U01 Lynnwood', WA 98036
AGIOSCIINCIS INC Tel. 425-774-0106 2001202 1 of 2
Fax. 425-774-2714 Report No. Date
1 11/29/01
rroject Name Location or Mdress Ny of the Week
derson Swimminia Pool Backfill 1225 10 — 93 rd Place W. Edmonds Thursdav
I
Construction
Construction
Client Rep.
Dick Cronin
Dick Cronin
Temp. (F)
43 0
Richard
J.H. Carlock
NOTED THE FOLLOWING: (Contractor Activities, HWA Activities, Outstanding Issues, and Resolutions).
Start Travel: 8:45 Arrived at Site: 9:00 Departed Site: 9:30 End Travel: 9:45
Ichard McKinley on site at the request of Dick Cronin to observe compaction methods being used backfill of the
nterior swimming pool located at 22510-93d Place W., Edmonds, Wa. At the time of our visit the contractor had jack -
hammered the concrete slab in the base of the pool into rubble, to allow for bottom drainage. The interstitial voids
tithin the concrete rubble layer were filled in using clean sand that was sluiced into place with a garden hose. Sufficient
and was placed to provide a level surface for placement and compaction for placement and compaction of the Type-17
mineral aggregate. An initial 8" thick lift of Type 17 aggregate was in place in the deep end of the pool and was being
Rompacted using a Bomag EY27-2B 'Robin' double -drum roller with vibration. Based on our observations, the
ontractors methodology is in accordance with our verbal recommendations.
Start Travel: 15:45 Arrived at Site: 16:00 Departed Site: 16:30 End Travel: 16:45
Jack Carlock on site at the request of Dick Cronin to test compaction of the Type- 17 mineral aggregate being placed a6d
Lmpacted as backfill of the swimming pool. The test results indicate that the compaction exceeds the recommended
-nimum density of 95% of Modified Proctor (see Tests I to 3 on attached Field Density Report).
I
I
11
11
I
I
I
S'5 i e
�ign
e ewed:
I
FIELD DENSITY TEST REPORT - NUCLEAR METHOD
FX—JASTIVI D 2922 and ASTM D 3017 F-1AASHT0 T238 and AASHTO T239 E-1WSD0TTM7
FWAGEOSCIENCES INC.
CLIENT: C & H Construction PROJECT NO.: 2001202 DATE: 11.29.01
PROJECT: Anderson Swimniing Pool Backfill MATERIAL BEING PLACED: Type-17 Matetial
PROJECT IMPROVEMENT TESTED: Swimming Pool Backfill
Test
No.
Detailed Test Location
Elev.
or
Depth
(ft)
Probe
Depth
(in)
Over-
Size
c
Ic
(Rc 'kj
Lab Control*
Proctor Information)
Field
Values
Relative
Compaction
Sample
I.D.
I Density (pcD
Wet Dens (pcf).
Dry Dens (pcf)
Fiel�d
%
Spec
OW
I MnisturROA
Moisture fpcf)
Moisture%
1
Deep end of pool, tight of center
grade
-5ft
8.
S-1
131.5
133.4
127.6
97
96
5.2
5.8
4.9
2
Deep end of pool, Jeft of center
grade
-5ft
8.
S-1
131.5
140.2
132.9
101
95
5.2
7.3
5.5
3
Mid portion of Pool
grade
-5ft
80
S-1
131.5
139.6
132.9
101
95
5.2
6.7
5.3
Densometer: I X ITro)der3411-B "CPN MC1-DR-P Other Serial #: 12216 Dens. Stnd.: 2924 Moist. Stnd: 686
*Lab Control: DASTM D698, Standard Proctor —]ASTM D 1557, Modified Proctor COMMENTS:
FX
FIAASHTO T-99, St andard Proctor FIAASHTO T-1 80, Modified Proctor
Completed By: Reviewed By: Z, =�2 Page 2 of 2
This report applies only to the items tested, and may be reproduced in full, with v4ritten approval of HWA GEOSCIENCES INC. Revised 7/01
I FIELD REPORT
16730-64th Avenue West
U LT 4", 1 Lynnwood, WA 98036 Job No.
INC Tel. 415-774-0106. 2001202
IHWAGEOSCIENCES Fax. 425-774-2714 Report No..
2
IP 'act Name Location or Address
Merson Swimming Pool Backfill 22510 — 93 rd Place W. Edmonds
Owner I Permit No.
Construction
Client Rep.
Dick Cronin
Contractor Rep.
Dick Cronin
Page No.
1 of 2
Date
11/30/01
Weather Temp. (F)
Rain� 43'
HWA Project Engineer
Richard McKinley
HWA Field Rep.
J.H. Carlock
NOTED TBE FOLLOWING: (Contractor Activities, HWA Activities, Outstanding Issues, and Resolutions)
Start Travel: 15:45 Arrived at Site: 16:00 Departed Site: 16:30 End Travel: 16:45
On site at the request of Dick Cronin to check density of Type- 17 material used in t he backfill of the Anderson family
fwimn-�ing pool
Upon arrival it was noted that the contractor has completed the backfill of the.swimming pool to approximately three
teet below subgrade. While on site HWA performed one Nuclear Field Density test. See the attached Field Density Test
eport sheet. No other testing was conducted. No samples were taken.
I
I
I
I
11
I
I
I
Signed:
R c
evi
I
FIELD DENSITY TEST REPORT - NUCLEAR METHOD
FEASTIVI D 2922 and ASTM D 3017 . F�AASHTO T238 and AASHTO T239 OWSDOT TM7
"I A
U.
HV&GE0SC1tNCES INC
CLIENT: C & H Construction PROJECT NO.: 2001202 DATE: -11. 30. 01
PROJECT: Anderson Swimming Pool Backfill MATERIAL BEING PLACED:-Type-17 Material
PROJECT IMPROVEMENT TESTED: Swimming Pool Backfill
Test
No.
Detailed Test Location
Elev.
or
Depth
(ft)
Probe
Depth
(in)
Over-
Size
(Rock�
(0/6)
Lab Control*
(Proctor Information)
Field
Values
Relative
Compaction
Sample
1. D.
I Density (pcfli
Wet Dens (pc
D Dens cL
Field
%
Spec'
OA
FMoisture%
Moisture (pc
Moisture%
1
Mid potfion of Pool
grade
-3ft
8"
20%
S-1
131.5
131.4
126.5
96
95�
5.2
4.9
3.9
Densometer F—x]Tro)der 3411 -B F—]CPN MCI-DR-P F--j Other Serial #: 12216 Dens. Stnd.: 2933 Moist. Sind: 682
*Lab Control: E�ASTM D698, Standard Proctor FDASTM D 1557, Modified Proctor COMMENTS:
F-1AASHTO T-99, Standard . Proctor 0AASHTO T-180, Modified Proctor
Completed By: Reviewed By: Page 2 of 2
This report applies only to the Hems tested, and may be reproduced in full, with written approval of HWA GEOSCIENCES INC. Revised 7/01
FIELD REPORT
16730-64th Avenue West
Lynnwood, WA 98036 Job No.
2001202
Page No.
1
LWAGEoScIENCES
Tel. 425-774-0106
of I
INC Fax. 425-774-2714 Report No.
Date
3
12/03/01
op. roject Name
Location or Address
Day of the Week
MAnderson Swimming
Pool Backfill
22510 — 93 rd Place W. Edmonds
Monday
Owner
Permit No.
Weather Tamp. (F)
..Anderson Family
I
Cloudy 40s
SClient
Client Rep.
HWA Project Engineer
MC&H Construction
Dick Cronin
Richard McKinley
Contractor
Contractor Rep.
HWA Field Rep.
W&H Construction
Dick Cronin
Richard McKinlev
NOTED TBE FOLLOWING: (Contractor Activities, HWA Activities, Outstanding Issues, and Resolutions)
Start Travel: 14:30 Arrived at Site: 14:45 Departed Site: 15:15 End Travel: 15:30
On site at the request of Dick Cronin to check compaction of fill material used in the backfill of the Anderson family
tw*mmlng pool. The contractor was unable to obtain delivery of the Type 17 mineral aggregate from his supplier today
nd is placing pea gravel as an alternate, starting about 3' below grade. The pea gravel was being compacted using the
Yibratory roller to consolidate each lift. The material was probed with a steel probe and found to be dense, firm and
Flayielding.
I
I
I
I
I
I
I
I
I
I
Signed:
Reviewed:
I
FIELD REPORT
16730-64th Avenue West
L,nnwood, WA 98036 Job No.
2001202
Page No.
UWAGEoScIENCES
Tel. 425-774-0106
1 of 2
INC Fax. 425-774-2714 Report No.
Date
4
12/04/01
Name
Location o Address
Day of the W,
rProject
derson Swimming
Pool Backfill
225 10'— 93 rd Place W. Edmonds
Tuesday
Owner
Permit No.
Weather
—Anderson Family
I
Cloudv
Construction
Construction
Dick Cronin
Contractor Rep.
Dick Cronin
Richard M
HWA Field Rep.
Richard M
NOTED TBE FOLLOWING: (Contractor Activities, HWA Activities, Outstanding Issues, and Resolutions)
Temp. (F
30s
Start Travel: 11:30 Arrived at Site: 11:45 Departed Site: 11:45 End Travel: 12:00
Site visit to check compaction but current lift has not yet been compacted. Contractor has reverted back to using Type
7 mineral aggregate for the final 1.5 feet of backfill. Fill is currently at I foot below grade.
Start Travel: 15:30' Arrived at Site:'15:45 Departed Site: 16:15 End Travel: 16:30
site at the request of Dick Cronin to check compaction of Type 17 mineral aggregate used in the backfill of the
Anderson family swimming pool. The contractor has placed and compacted the Type 17 mineral aggregate to final
trade. One density test was performed on the final lift near the center of the pool area (see attached Field Density Test
eport). The indicated compaction exceeds the recommended minimum density of 95% of Modified Proctor.
I
I
I
I
I
I
D
I
Siped: Z2, --2,>z`�'
9K
Reviewed:"
I
FIELD DENSITY TEST REPORT - NUCLEAR METHOD --IWSDOTTM7
EASTIVI D 2922 and ASTIVI D 3017 F 1ASHT0 T238 and AASHTO T239 F
EWAGEOSCIENCES INC.
CLIENT: , C & H Construction PROJECT NO.: 2001202 DATE: 12.4. 01
PROJECT: Anderson Swimming Pool Backfill MATERIAL BEING PLACED: Type-17 Matefial
PROJECT IMPROVEMENT TESTED: Swimming Pool Backfill
Test
No.
Detailed Test Locat I ion
Elev.
or
Depth
(ft)
Probe
Depth
(in)
r
Over-
Size
c
(Roc
jk
- %
Lab Control*
roctor nformation)
Field
Values
Relative
Compaction
Sample
I n
e
[R_nsity (pco
--TDry
Wet Dens (pcf)
Dens (Pcf L
Field
Spec&
M oisture%
Moisture (Pcf)
Moisture%
1
Mid portion of Pool
grade
8"
20%
S-1
131.5
133.7
125.8
96
95
5.2
7.9
6.3
Densometer: Tro)der 3411 -B Fx1CPN MCI -DR-P F--j Other Serial #: MD00505617 Dens. Stnd.: 45217 Moist. Stnd: 8283
*Lab Control: 0ASTM D698, Standard Proctor ETIASTM D 1557, Modified -Proctor COMMENTS:
0AASHTO T-99, Standard Proctor 0AASHTO T-180, Modified Proctor
Completed By: RWIVI Reviewed By: Page 2 of 2
This report applies only to the Hems tested, and may be reproduced In full, with written approval of HWA GEOSCIENCES INC. Revised 7/01
Property Address:
Assessor's Parcel Ni
Legal Description:
ADU File Number:
ACCESSORY DWELLING UNIT COVENANT
ZZ6-10 93, /?7Z,,_)
Edmonds, Washington
1, the undersigned, have attained approval for an accessory dwelling unit (ADU) at the
property address above, in accordance with the provisions of Section 17.40.025
(Nonconforming Accessory Dwelling Units) of the Edmonds Community Development Code.
I agree and understand that it is my responsibility to notify all future property owners or long-
term lessors of the existence of the ADU and that its existence is predicated upon the
occupancy of either the ADU or primary dwelling unit by the owner of the property.
Additionally, I will notify all prospective buyers of the limitations on use and maintenance of
the ADU as stipulated in Chapter 20.21 (Accessory Dwelling Units) of the Edmonds
Community Development Code. An example of the limitations of the ADU per Chapter
20.21 is the property owner is required to reside in the primary or accessory dwelling unit for
6 months out of every year. No changes to the Accessory Dwelling Unit can make it more
nonconforming than it was at the time of registration.
Finally, this covenant shall be recorded in order to notify all current and. future property
owners that if any conditions of the ADU approval are violated, the property owner will be
required to remove all improvements which were added to convert the primary dwelling unit
into an ADU and restore the site to a single-family dwelling unit.
Property Owner Signature:.
Print Name: Re,-,4,41,
Date: () Z, Z) / 0 /
STATE OF WASHINGTON)
COUNTY OF SNOHOMISH)
I certify that I know or have satisfactory evidence that .4
signed thi s instrument and acknowledge it to be his/her free and voluntary act for the uses and
purposes mentioned in this instrument.
Notary's pressure seals must be smudged. Dated: oleo Zo
Signature of
MAOND Notary Public:
LA
y
BY PUBLIC Residing at: ele- A
STATE OF WM:
V:
W=
a]
COMMISSION 9 My Appointment
APRIL 3 2003 Expires:
THIS DOCUM kNT MUST BE RECORDED WITH THE SNOHOMISH COUNTY AUDITOR.
a
ADUcovenantAmnesty.doc