22721 76TH AVE W (2)ZZ�Zi 7Wii AL)C,
FIRE PREVENTION
if�Serving Brier, Edmonds, and 12425 Meridian Ave S INSPECTION REPORT
Mountlake Terrace Everett, WA 98208 16EDMONDS
DBRIER '
Phone (425) 551-1206 D MOUNTLAKE TERRACE
www. FireDistrict]. org Fax (425) 551-1272 [3 UNINCORPORATED
r FREOUENCY
STATION & SHIFT_'�
LOCATION:
22721 76 th Avenue W 98026
BUSINESS NAME:
PHONE:
SCHEDULED
DATE DUE �
Henry Hockberg, MID
4256722427.
jwl2Q4cq
MAILING
UFIR 0
ADDRESS:
k,� 593107
22721 76th Avenue W, Edmonds, WA 98026
BUSINESS OWNER:
HOME PHONE:
Hochberg, Henry
EMERGENCY-1:
HOME PHONE:
CURRENT
KE Y ACCESS-2: Michelle K.
HOME PHONE:
2067908648
CITY YES NO
.
EMAIL:
BUSINESS VO
LICENSE
PERSON CONTACTED:
INITIAL INSPECTION DATE
. NAME OF INSPECTOR:
��Z_o 7—
9.711-16
FIRE SYSTEMS: FIE I+M-2-
06WA§Pgg�#nWCATIONS/COMMUNICATIONt
2
2
3 ..... .....
3
�4 .
4
5
6
6
7
7
I AGREE TO CdRRECT THE ABOVE VIOLATION(S) IN THE NEXT 30 DAYS X
1st RE -INSPECTION
2nd RE -INSPECTION
EXTENSION
FINAL RE -INSPECTION
VIOLATIONS
DATE DUE:
DATE DUE:
GRANTEDTO:
DATE DUE:
CITED:
PERSON
CONTACTED:
PERSON
CONTACTED:
PERSOfj,
CONTACTED:
INSPECTOR:
INSPECTOR:
INSPECTOR-
2
DATE:
DATE:
DATE:
3
VIOLATIONS
VIOLATIONS;�''
PRE -CITATION
CITATION ISSUED
15
15
LETTER SENT
NUMBER,
4
2
DATE:
CODE
SECTION-
5
6
RETURN RECEIPT
3 7
RECEIVED
6
DISPOSII ION:
4
8
4 8
LETTER NEED ED [] YES NO
DATE:
7
LETTER NEEDED E] YES 0 NO
1
8
FIRE PREVENTION
Serving*Brier, Ednionds
12425 Meridian Ave S
INSPECTION REPORT
SNOHOMISH CO.
Mountlake Terraceand
FIRE,f*4�0:'j
Everett, WA 98208
EDMONDS
BRIER
7 the Town of Woodway
Phone (425) 551-1200
[1WOODWAY
0 MOUNTLAKE TERRACE
1-DISTRI6 www.FireDistrictl.org
Fax (425) 551-1272
0 UNINCORPORATED
FREQUENCY STATION & SHIFT"
LOCATION:
22721 76th Ave W
731 20 A
I
BUSINESS NAME:
Henry Hochberg, MD
PHONE
4256722427
SCHEDULED
DATE DUE 11' 07/01/13
MAILING 22727 76th Ave W
LIFIR 1, 593 7107
ADDRESS:
Edmonds
98026
BUSINESS OWNER: Hochberg, Henry
HOME PHONE: 4254876371
EMERGENCY-1:
HOME PHONE:
"CURRENT
KEY ACCESS-2:
Michelle K.
HOME PHONE
2067908648
CITY YES NO
BUS )INESS
LICENSE
PERSON CONTACTED: IIAC)0t-,(
INITIAL INSPECTION DATE
NAME OF INSPECTOR:
-FIRE
FEll o2_
SYSTEMS:
ANNUAL
I 1-f
HAZARDS FOUND AND LOCATIONS /COMMUNICATIONS
WO �4 t-11 li�
2
2
3
3
4
4
5
5
6
6
7
7
1 AGREE TO CORRECT THE ABOVE VIOLATION(S) IN THE NEXT 30 DAYS X
lst RE -INSPECTION
DATE DUE:
2nd RE -INSPECTION
DATE DUE:
EXTENSION
GRANTED TO:
FINAL RE -INSPECTION
DATE DUE:
VIOLATIONS
CITED:
PERSON
CONTACTED:
PERSON
CONTACTED:
PERSON
CONTACTED:
1
INSPECTOR:
INSPECTOR:
INSPECTOR:
2
DATE:
DATE:
DATE:
3
VIOLATIONS
1 5
VIOLATIONS
1 5
PRE -CITATION
LETTER SENT
CITATION ISSUED
NUMBER:
4
2
6
2
6
DATE:
CODE
SECTION:
5
3
7
3
7
RETURN RECEIPT
RECEIVED
6
4 J..
.8
4
8
DATE:
DISPOSITION:
7
I., LETTEO NEEDED [) YES F1 No
LETTER NEEDED F] YES [I NO
-
FIRE DEPARTMENT COPY
Pre Application Meeting
April 23, 1999 — 9:00 a.m.
Applicant: r. er
Site A( ress: 22121 — 76th Avenue West
Remodel of Mixed Use Building
re pp #99-00
Attending: Representing City Sta Ray Miller, Jeannine Graf,!J,^o_ Lyle
Chrisman
Representing Applicant: Dr. Hochberg
Planning:
9 No one from Planning spoke, other than various comments throughout the meeting
from Ray....
Engineering: -(Lyle)
0 9 parking stalls are required, and there is some c ' oncern with stalls 8 and 9, not sure
how cars will maneuver and parallel park. Trees may need to be removed to allow
for parking space. Applicant was under the impression that he is not allowed to
change the vegetation. Check with Planning. The layout is not conducive to parking
at current angles. Ray said taking shrubbery out and replacing it elsewhere would be
OK. A discussion re parking reconfiguration ensued. Drawings will need to show a
cross-section of entrance, showing grades (6% is maximum). Parking space size
requirement is 14 V2' x 8 V2 with 2? overhang. With no landscape area, size is 16' x 8
1/2�
* A curbed radius into parking is required on entrance from 76h.
e There will be a traffic mitigation f�e of $952, which is based on peak hour trips.
There may be other requirements, Gordy Hyde will review upon his return
e Future permits for parking may require a design performed by a professional
engineer. It will need to include storm water control, drainage, etc.
0 When overlaying parking lot, will need to show that grading to 76 th Will match
existing grade. This may require some removal of current asphalt at entrance to
match grade and avoid a thin layer of new asphalt.
e Make all changes to design, bring in next week and show to Gordy.
There will be work in the City right of way, so contractor doing the work will be
required to get a right of way permit.
Fire: (John)
• Applicant explained stair patterns and was asked to draw them on the plans. Need I
hour separation from office to residential in ceiling or floor. I extinguisher needed.
Plan needs to show windows, openings.
• Smoke detector should be installed on outside of door in hall leading up to front door.
A newer floor plan would help determine where detectors need to go.
PreApp Mtg 4/23/99 (1) -1-
4
Building: (Jeannine)
0 Applicant said ADB told him if he takes any landscaping out, he'll have to replace it.
Also must have 9 parking spaces, which is based on use of space within the building.
Parallel spaces would need to be discussed with Gordy or Jamal. Single family only
requires I space. Applicant needs to verify I hour occupancy separation between
single family use and proposed use. Applicant can look at gypsum manual to
determine what separation can be used. If applicant changes use of space to get
around I hour separation, then parking will have to be reevaluated. Solid core door
(I hr. door) is also required. No non -ambulatory people in office at any time. City
needs to know overlay portion of business/single family. Toilet room needs to be
barrier -free. Applicant is not sure bathroom meets 5' requirement. Jeannine will
provide detail. Parking space will not exceed slope of I and 48, and a sign must be
provided.
Building permit process is approximately 2 weeks. The more complete the submittal,
the faster the process goes.
No work may be done without a permit. Applicant can get a separate interior
demolition permit to begin on walls, but building permit will be issued after 10
(business) day ADB appeal period.
Door at top of interior stairs is required to be rated. Door at bottom of stairs does not
need to be rated. If there is no door, a door must be installed.
Meeting concluded.
PreApp Mtg 4/23/99 (1) -2-
RECEIVED
2,3, 1999
IS FIRE DE
PP
REAPPLICATION MEETING
Notification & Plans
To:
Building E] Engineering E] Fire Planning E] Ray Miller E]
From:
Jana E] / Linda F1
Date:
April 19, 1999
Meeting Date:
April 23, 1999
Meeting Time:
9:00 A.M.
Applicant:
Dr. Hochberg
Contact Info:
Dr. Hochberg
Project:
Remodel 22721 76hAvenue W
Pre-App.
PA 99-0007
I have e-mailed each of you and scheduled this on your calendar. Attached please find the plans for this
meeting.
M C70 I C4—L— Ot=j9 C&
H-R- - < &P 94�1� 70
(p-J-466 C4A-615 S4 rtaf:4L
A-V 0
-2,,+, 10 6 : c -p " C,46,-A—
or— Owi5�-k-,,Jz.
cc: Conni Curtis