LOCATION: 228 2 nd Avenue N 98020
BUSINESS NAME: Edmonds Sunset.view Condos PHONE: 4257781815
MAILING
ADDRESS: 228 2nd Avenue N, Edmonds, WA 98020
BUSINESS OWNER:
HOME PHONE:
FIRE PREVENTION
IN;%,PECTION REPORT
.ZIEDMONDS
OEIRIER
0 MOUNTLAKE TERRACE
[I UNINCORPORATED
FREQUENCY STATION& SHIFT'*,
Annual 17-D
SCHEDULED Sep,2017
DATE DUE
427202
UFIR
1.
EMERGENCY-11: Abernathy, Pamela #4 HOMEPHONE: 8473060111 — f6e --,
CURRENT PE S' NO
KEY ACCESS-2: HOME PHONE: 17 CITY
EMAIL: BUSINESS
LICENSE
INITIAL INSPECTION DATE
PERSON CONTACTED: vak,
NAME OF INSPECTOR:
FIRE SYSTEMS: FE 7/18 112�09-..N-AV—
Date Last Serviced:
FIRE PREVENTION
'12425 Merididfi Ave S INSPECTION REPORT
Serving Brl' r,' Edmonds, and
SNOkOMISH CO
OEDMONDS
Mou'liflafi Terrace Everett, WA 98208 0 BRIER
Fl Phone (425) 551-1200 0 MOUNTLAKE TERRACE
0 UNINCORPORATED
D I 10'31PL R www.FireDistrict].org Fax (425) 551-1272
LOCATION: 228 2 nd Avenue N 98020
BUSINESS NAME: Edmonds Sunset View Condos
MAILING
ADDRESS: 228 2nd Avenue N, Edmonds, WA 98020
PHONE:
4257781815
E UENCY
n I STTfV SHIFT
nQua
SCHEDULED Sep 2016
DATE DUE I`
42( ZU2
UFIR ll�
BUSINESS OWNER: HOME PHONE:
ftw-tj"rl �"blff M 34 0/0
James G/Norma Murphy 425,7-784ZI5 7-1)
EMERGENCWl-N HOME PHONE: CURRENT
YES NO
KEYACCESS-2: HOME PHONE: CITY
BUSINESS
.EMAIL: 441 LICENSE
PERSON CONTACTED: 1j, C,,t 1.'y INITIAL INSPECTION DATE
NAME OF INSPECTOR:
:IRE SYSTEMS: AS, 7112) FA117/12 F _/_ 12:00:00 AM
Date Last Si;�iced:
HAZ�RDS FOUND AND LOCATIONS COMMUNICATIONS
10 lij�'e5 cj- forvp��4_7 T4u,,e_"4-,; a_Jagov I
OLt-cer.s- Ow'�� is elota�r� A,*S t—ovej We�
2 iAo+- cfr,ve. If& 14711)7"w 2
3
i c7 IflNi4fal— -56a w c.� -P4-7*6- 3
4 96-W 0 V& I— /,73-'VS /A/ 0�0" 0) or fr 12&.X 4
5 5
6
6
7 7
I AGREE TO CORRECTTHE ABOVE VIOLATION(S) IN THE NEXT 30 DAYS X
Ist RE -INSPECTION
2nd RE -INSPECTION
� FINAL RE -INSPECTION
EXTENSION vioLATioNS
CATE DUE:
DATE DUE:
GRANTEDTO CITED:
DATE DUE:
PERSON
PERSON
PERSON
5ONTACTED.
CONTACTED.
i CONTACTED
INSPECTOR:
INSPECTOR:
2
INSPECTOR:
DATE
DATE.
PATE.
VIOLATIONS
VIOLATIONS
CITATION iS§lUED
PRE -CITATION
1 5
1 5
4
LETTER SENT NUMBER
CODE 5
2
2 6
DATE SECTiON
RETURN RECEIPT
7_
7
RECEIVED 6
DISPOSITION
8
4 8
DATE- 7
LETTER NEEDED YES NO
LETTER NEEDED b YES El NO
8
James 0,, Murphy
October 7, 1993
Mr. John J. Westfall
Inspector
City of Edmonds
Civic Center
Edmonds, Washington 98020
Dear Mr. Westfall:
Please change your records to show our correct address is:
Sunset View Condominiums
228 Second Avenue North
Unit #5
Edmonds, Washington 98020.
We have received your letter regarding fire extinguishers and alarms, but we may not be
able to meet by October 13th.
111� rs very truly,
es G. Murphy
JGM:hj
RECEIVED
OCT 8 1993
EDMONDS FIRE DERL
P.O. Box 504
Edmonds, Washington 98020
Telephone: (206) 778-1815 or (206) 771-6189
Fax: (206) 672-9385
James R. Murphy
October 20, 1993
Mr. John J. Westfall
Inspector
City of Edmonds
Civic Center
Edmonds, Washington 98020
Dear Mr. WestfO:
Enclosed you will find the completed Fire Hazard Form dated 9/13/93.
We have contracted with Triple AAA Fire Extinguisher Company (of Everett) to provide
our annual check and service our fire extinguishers.
If you have any further questions, please contact me.
Yours very truly,
J s
GM:hj
Enclosure
P.O. Box 504
Edmonds, Washington 98020
Telephone: (206) 778-1815 or (206) 771-6189
Fax: (206) 672-9385
RECEIVED
OCT 2 1 1993
EDMONDS FIRE DEEM
0
International Conference.'of Building Officials
REGIONALOFFICE: 2122-112TH AVENUE, N.E., SUITE B-300 - BELLEVUE. WASHINGTON' 98004 * (206)451-9541
BOARD OF DIRECTORS
CHAIRMAN
BRENT SNYDER, C.B.O.
BUILDING OFFICIAL
PACIFICA, CALIFORNIA
FIRST VICE-CHAIRMAN
EUGENE J. ZELLER, P.E, C.B.O.
SUPERINTENDENT OF BUILDING
AND SAFETY
LONG BEACH, CALIFORNIA
SECOND VICE-CHAIRMAN
JAMES L MANSON, C.B.O.
DIRECTOR. DEPARTMENT OF
BUILDING AND SAFETY
CGUNTYOFSPOKANE
SPOKANE, WASHINGTON
IMMEDIATE PAST CHAIRMAN
WILLIAM E. SCHILECHT. C.B.O.
BUILDING OFFICIAL
COUNTY OF WASHINGTON
HILLSBORO. OREGON
ROBERT J. EPPSTEIN, C.B.O.
CHIEF BUILDING OFFICIAL
FREMONT. CALIFORNIA
BOB FOWLER, P.E, AIA. C.B.O.
DIRECTOR OF BUILDING INSPECTION
ABILENE, TEXAS
JAN P. GASTERLAND. C.B.O.
BUILDING CODE OFFICER
ST. PAUL MIN�ESOTA
PHILLIP M. HERRINGTON, C.B.O.
DIRECTOR. DEPARTMENT OF
BUILDING AND SAFETY
RENO.NEVADA
DOUGLAS E. HOOD, C.B.O.
BUILDING OFFICIAL
COLORADO RIVER INDIAN TRIBES
PARKER. ARIZONA
GORDON W. MURDOCH. P.E.
BUILDING OFFICIAL
DANA POINT. CALIFORNIA
MICHAEL J. NOLTE, C.B.O.
BUILDING OFFICIAL
CRESWELL. OREGON
RON PERKEREWICZ. C.B.O.
DIRECTOR OF COMMUNITY
DEVELOPMENT
COUNTY OF KITSAP
PORT ORCHARD. WASHINGTON
JAMES R. SINGLETON C.B.O.
BUILDING SAFETY ADMINiSTRATOR
TUCSON. ARIZONA
THOMAS R. THOMPSON, C.B.O.
BUILDING OFFICIAL
BROOMFIELD. COLORADO
ROBERT D. WEBER, P.E., C . B.O.
DIRECTOR. DEPARTMENT OF BUILDING
COUNTY OF CLARK
LAS VEGAS. NEVADA
ALLEN 0. ZEPPER, C.B.O.
BUILDING OFFICIAL
STILLWATER. MINNESOTA
PRESIDENT
JAMES E. BIHR, P.E.
JR 1;� L 9 1 V ra D
JAN "S 1411
December 15, 1989
Jerry Saterlie
Acting Building Official
250 5th Avenue North
Edmonds, WA 98020
Dear Mr. Saterlie:
OFFICES OF
JERRY J. BARBERA, P.E.
REGIONAL MANAGER
JUAN C. INCHAUSTE, P.E
SENIOR REGIONAL ENGINEER
FRANK S. NATSUHARA, P.E.. S.E.
SENIOR REGIONAL ENGINEER
CHARLES J. WILLIAMS, P.E.
REGIONAL ENGINEER
Plan Check: 2593
Project: 4 Plex
Address: 228 2nd Ave N
Code Information: R1/B1 Occupancy;
Type V-N Construction
Stories: 2 Stories over basement
Floor Area: 6155.45/2601
Occupant Load: 43
Valuation: $340,000
1988 Uniform Building Code
Seismic Zone: 3
Basic Wind Speed: 80 mph
Exposure: B
We have reviewed the plans and associated data ' for the
project mentioned above to see if it conforms to the Uniform
Building Code as well as parts of the Uniform Mechanical
Code. We have not reviewed them for requirements of federal,
or other state-.thd local regulatory agencies. In most cases,
the designer should modify the plans and/or specifications
to satisfy these comments.
N 0 N S T R U C T U R A L
GENERAL
/1. Your Public Works Department should review the plans
for street improvements, curb cuts, and storm drainage
requirements.
1/ 2. Your Fire Department should ensure that the fire hydrants
are within 150' of the.site and that fire extinguishers are
provided in the building. Refer to Article 10 of the LIFIC.
C 1�—
FAXNUMBERS
Ordef Deparimeni (213) 692-3853
Plan Ae�iew (213)692-3425
iCBO ES.t (213� 695-4694
Administr ion (2 1 3 699-8031
kA,; � () ff; � - �z'z r, n q— -t I, \ A l—t- — � \ A; I I P —4 - \ �-.; �-; — (- -- ;:, — i �' a nrn I . (') 1 1) AQ Q _n ; -1 1
Plan Check 2593
Jerry Saterlie, Edmonds
December 15, 1989
Page Two
3. You should ensure that the Washington State Energy Code is followed.
I am including a guide sheet for your assistance.
4. You should ensure that the sewer is large enough to handle the increased
flow due to the discharge from the new building.
The size, location and slope of the sewer line should be shown on
the site plans. Section 302 (b) .
6. The legal -description of the property should be reviewed and approved
by you. Section 302(a)2.
CL7. The drainage plans should be submitted for review prior to permit
�5__issuance. Section 302(b). The plans should address the following items:
a. All the ground surface water should be directed away from the
building. A note should be added to the plans.
b. The roof drainage system- should be a tight -line system near the
ground surface. The footing drains should be independent from
the roof drainage system. Both systems should be tight -lined.
A note should be added to the plans.
OCCUPANCY COMMENTS
Al - ;�,I. This building should be classified as R-1/B-1 occupancy. The note
on sheet A-1 should be corrected from M-2 to B-1 occupancy. Section
501 and 1201.
it 2. The parking garage area is larger than 3000 sq ft. Therefore, it
should be classified as a B-1 occupancy. Section 701, 1101 and 1102(b).
Ab 3. A two hour occupancy separation between the garage. (B-1 occupancy)
and the dwelling units (R-1 occupancy) should be provided at the following
locations:
It a. At the floor/ceiling assembly between the garage and the dwelling
units.
It b. Stairs I and 2 should be separated from the garage.
It c. The elevator shaft walls from the basement to the first level should
be of two hour fire resistive construction.
All the openings in the two hour occupancy separation walls should be
of one and one-half hour fire protection rating. Section 503 (a, b, c, d)
exception 2.
Plan Check 2593
Jerry Saterlie, Edmonds
December 15, 1989
Page Three
4. The building is within the height and area limitations according to
sections 505 and 507.
�,6
5. All the structural members supporting the horizontal two hour occupancy
separation should also be protected by a two hour fire resistive construction.
Section 503(b). This should be noted on the plans and details should
be provided.
6. Section 510(a) requires that a room with a water closet should be
separated from food preparation rooms or ---storage rooms by a tight -fitting
door. The bathroom doors near the kitchens should be a tight -fitting
door. Refer to units 1, 2 and 4.
7. Accessories such as grab bars, towel bars, paper dispensers and
soap dishes provided on or within the walls should be installed and sealed
to protect the structural elements from moisture. Section 510(b). This
should be specified on the plans.
8. The shower compartments should be finished with smooth, hard, nonabsorbent.
materials such as ceramic tile to a height of not less than 70" from the
drain inlet. This should be noted on the plans. Section 510(b).
9. The gypsum wall board specified as a base for the tile on the shower
enclosures should comply with the requirements of section 4712 and UBC
Standard 47-14. This should be specified on the plans.
10. The water closet.stools should have a clear space not less than 30"
in width and a clear space in front of not less than 24". The dimensions
for the clear space should be noted on the plans. Section 511 (a).
f6w
11. The parking garage should have an unobstructed headroom clearance
6v--)
of not less than 71 above the. finish floor to any ceiling, beam, pipe or
(,,,",;,,,similar
construction. You !�h_ould ensure this is provided. It appears
At) that the W21. x 62-steel beam-s-"4 including the two hour fire protection covering
will encroach into the 71 head room clearance. Section 702(b)5.
TWO V',1+c1Pe'',512. Ventilation should be provided for the parking areas. The ventilation
loee-i "Mr�."/system
should be capable of exhausting a minimum of 1.5 cfm per sq
of gross floor area. The building official -may approve an alternate
ventilation system designed to ventilate 14000 cfm for each operating vehicle.
Section 705. This should be addressed on the plans.
13. The habitable rooms on all levels have been provided with adequate
natural light and ventilation by means of exterior glazed openings. Section
;::'�xe;
1205(b) . However, the Den in the second level has not been provided
I
Al-c- � �� I
with natural light or ventilation. This should be corrected. Section
1205 (a) .
Plan Check 2593
Jerry Saterlie, Edmonds
December 15, 1989
Page Four
All the bathrooms, water closets and utility rooms have been provided
with mechanical ventilation as required by section 1205(c). However,
the size of the fans for all the above mentioned rooms should be specified
on the plans. The mechanical ventilation should be capable of providing
fire air changer per hour. The point of discharge of exhaust air should
be at least 5' from any mechanical venting intake.
15. The kitchens, halls and bathrooms may have ceiling heights of not
less than 7'. You should ensure this is followed.
16. The bedroom in the second level close to stair 2 should be provided
with operable windows approved for emergency escape. The escape windows
should have a clear openable area of 5.7 sq ft with a minimum net clear
height and width dimensions of 24" and 20". The sill height should not
be more than 44" above the floor. Section 1204.
17. The required smoke detectors should receive their primary power
from the building wiring when such' wiring is provided from a commercial.
source. The wiring should be permanent and without a disconnecting
switch. Section 1210(a)3. This, should be noted on the plans.
18. The smoke detectors should be installed on each story. This should
be provided. The smoke detectors should sound an alarm audible in
sleeping rooms. Section 1204(a)4.
19. The smoke detectors should be installed on the ceiling or wall at
Al- a point centrally located in the corridor area giving access to the bedrooms.
Section 1204.(a)4. The location of the smoke detectors should be shown
on the plans.
20. The heating system should. be capable of maintaining a room temperature
of 700 F at -a point of 3' above the floor in all the habitable rooms. The
heating system should be ju-s-tified.
TYPE OF CONSTRUCTION
1. For the purpose of this plan review I will assume all the materials
to be compatible with type V-N construction. Sections 2201 to 2205.
However, the following conditions must be met so the building structure
falls within the type V-N classification:
a. The building must comply with all the requirements of section
403 (basements)
b. The finish grade elevations should be measured as specified in
section 408 (GRADE: Adjacent Ground Elevation)
/ - c. The first story should be in compliance with section 420 (STORY).
Plan Check 2593
Jerry Saterlie, Edmonds
December 15, 1989
Page Five
The architect should submit calculations of the finish grade elevations
;401
around the perimeter of the building to justify the building is a two story
1-40
over basement structure. If the finish grade is such that the building
16
does not qualify as a two story over basement the type of construction
must be type V-1 hour throughout. Table 5-D and section 1202 (b) .
2. The floor ceiling assembly between the garage and the dwelling units
should be of two hour fire resistive construction. The assembly shown
on the plans on sheet A-5 does not comply -with the required fire rating.
This should be corrected. I am including a copy of UL design for the
designers information.
3. All the columns supporting the floor system over the garage should
be protected by two hour fire resistive construction. Details for the
fire resistive protection should be provided for review.
4. The column's fire protection covering is exposed to injury from moving
vehicles within the garage. Therefore, column jacketing or other means
of protecting the fire covering should be specified on the plans. The
method of column protection should be approved by the building official.
Section 4303(b)5.
5. The steel beams and glulam beams supporting the two hour fire resistive.
assembly and loads from the second level and roof should be individually
wrapped with the same fire protection as the floor assembly. Section
4303 (b) 6. Details showing the individual protection of the steel and wood
beams should be submitted for review.
6. Details for the penetrat ions on the two hour floor ceiling assembly
should be provided for review. Fire stopping should be of an approved
material, securely instatled and capable of maintaining its integrity where
subject to the time temperat_ure curve of UBC Standard 43-1. Section 4305.
The walls separating the__`g�arage and the dwelling units at the elevator
7.
shaft and next to the stairs should be of two hour fire resistive construction.
Details should be provided on the plans. A design from the Fire Resistive
Manual from the Gypsum Association may be specified.
I - A's, 8. The weather resistive barrier to protect the interior wall covering
Z_A5 should be as specified in UBC Standard for kraft waterproof building
3-,A,g paper. You should ensure this is followed. This should be specified
on the plans.
9. The foundation walls enclosing the basement should be damp proofed.
Section 1709(d) .
Plan Check 2593
Jerry Saterlie, Edmonds
December 15, 1989
Page Six
4 * -j
c .Q,10. Specifications for the elastomeric coating should be submitted for
review. so we can verify if it is an adequate water proofing agent. Section
1707(c).
11. The spacing of the horizontal pipes of the guardrail shown on detail
2 of sheet A5 should be such that a sphere 611 in diameter can not pass
A,( through. Section 1711. This should be noted on the plans.
Draft stops should be provided in the attic and overhangs and should
be above and in line with'the wall separating tenant spaces from each
A.,hother and from other uses. Section 2516(f)3B(ii). T his should be shown
on the roof plan.
13. Specify' method of anchorage for the roof tile. The concrete roof
JL
i 14 tile should comply with an ICBO technical report or other approved data
to show it complies with UBC Standard 32-12. Table 32-D-1.
-7 - t:51 14. Each elevator lobby or entrance area should be provided with an
C4 -X4 approved smoke detector. Section 5103(g).
uAc- r1000 15. The elevator shaft should be vented. to the outside. The area of
'Alt the vent should be not less than-3-1/2% of the area of the elevator shaft.
Section 5104.
16. The glazing within doors and within 12" of all doors, sliding glass
doors, showers and bath enclosures should be labeled impact type per
UBC Standard 54-2. Section 5406.
EXIT
1. Two exits are required from the second level. The exit should be
separated by a distance equal to 1/2 the overall maximum diagonal at
(M. S the second. level. The maximum diagonal is 75.25'. The distance between
st�rir I and stair 2 is less thAn 37.63'. Also the distribution of the exit
should be such that any arec-rwithin the unit with 10 or more occupants
should have access to two required exits. Section 3303(c).
2. Stair 1 exits into a garage. The overhead door is not acceptable
as a required exit. Section 3304(n) . This should be corrected.
3. All the exit doors should be openable from the inside without the
use of a key or any special knowledge. This should be noted on the
plans. Section 3304(c) .
4. The height of all exit doors should be specified on the plans. Section
3304(f) .
5. There should be a floor or landing on each side of the door. The
door or landing should be not more than I" lower than the threshold
of the doorway. This should be noted on the plans. , Section 3304(i) .
Plan Check 2593 '
Jerry Saterlie, Edmonds
December 15, 1989
Page Seven
6.
The
dimensions of all
landings should be shown on the plans. Section
3304(j)
.
7.
The
handgrip of the
handrail as shown on detail 1 on sheet 6 has
a
dimension greater than
211. This should be corrected. Section 3306(j) .
t5�o'-1 A68.
Fire
blocking should
be provided at midspan on stair 1.
6,4. It appears from the sections that the bottom soffit of the stairs will
Z�,.�61,94_be separating the B-1 occupancy and the R-1 occupancy. This is not
e since a two hour occupancy separation is required. The designer
acceptabl
should clearly define the occupancy separation around the stairs. Section
503(c).
�X.e 'e-1 �'A
10. The garage floor should drain to
an approved oil separator or trap
J4>�!p,
discharging to sewers. Section 702(b).
11. If the water heaters do not have
a rigid water connection
and they.
are over 41 in height, they should be
anchored or strapped to
-resist
horizontal forces due to seismic loads.
Section 504 UMC.
f lov,
12. The locations of the dryer vents
should be shown on. the
plans.
Section 1903 UMC.
Structural comments will follow under
separate cover.
Our headquarters accounting department in Whittier, California
will send
you an invoice for this plan- reviewing
service based on a valuation of
$ 340,000.
I am returning all data and plans to the designer and am taking the liberty
of sending a copy of this list- directly to him. To do the recheck, the
designer should revise the p-Tans and specifications, indicate on a separate
sheet on which sheet or deta-ir the corrections may be found and return
these check prints. Please feel free to contact me if there are any questions.
Very truly yours,
6Puane C.Jc_h=ust"eP. E.
Regional Engineer
spM
Enclosure
c/Warren Lafon Architects
n; Rj A
'OFFICE CORRESPONDENCE;
I ER
Nlt
TO, k
FROM 94 � ez, DATE,'
SUBJ
ECT
04?4_�allp top
0
�44 1� (e, -P are_ k-X -
Ij
LD
47
fill
iw-
ON,