Loading...
22806 96TH PL W.PDF9513 22806 96TH PL W on, ADDRESS: �0 ?J075I p TAX ACCOU NT/PARCEL #: 00q 3-7 6) 00 00 0 7 00 BUILDING PERMIT (NEW STRUCTURE)#: 0-7�----7 COVENANTS (RECORDED) FOR: CRITICAL AREAS #:M—p I M DETERMINATION: 0 Conditional Waiver Xstudy Required [:1 Waiver CRITICAL AREAS M DETERMINATION: El Conditional Waiver Study Required E] Waiver DISCRETIONARY PERMIT #S: DRAINAGE PLAN DATED: PARKING AGREEMENTS DATED: EASEMENT(S) RECORD FOR: PERMITS (OTHER — list permit Xs): PLANNING DATA CHECKLIST DATED: SCALED PLOT PLAN DATED: SEWER LID FEE $: LID #: SHORT PLAT FILE: LOT: BLOCK: SIDE SEWER AS BUILT DATED: SIDE SEWER PERMIT(S) #: GEOTECH REPORT DATED: STREET USE]ENCROACHMENT PERMIT #: FOR: WATER METER TAP CARD DATED: OTHER: L:\TEMP\DST's\Forms\Jana's Street File Checklist 5-14-08.doc PLANNING DATA SINGLE FAMILY RESIDENTIAL II S TR EE T F=ILE I Name: Date: 11-10 Site Address: Tax Parcel -71 000c9o,7oo Project Description: Plan Check #: B L-:\,) AM D 07S-7 Reduced Site Plan Provided: NO) Zoning: gs-16 Map Page: Corner Lot: (YES /0 Flag Lot: (YES Critical Areas Determination # 7-D 0 r) I - Study Required waiver A SEPA Determination: 1\AVQ5 .4 0 Exempt A-, r re, 5 "k El Needed (for over 500 cubic yards of grading) 0 Fee 0 Checklist 0 APO List with notarized form Required Setbacks Street: Side: Side: -7 1 LA.) a —r. ActualSetbacks Street* ide: Side: ear: El Detached Structures: El Rockeries: El Fences/Trellises: -&]-Bay Windows/Projecting Modulation: c� El Stairs/Deck: Height Datum Point: t- Datum Elevation: SO 5V, 0 Maximum Height Allowed: to (2 5- Actual Height: goR,16 Offier Parking Required: Parking Provided: Lot Area: g b �—g Maximum Lot Coverage: 35% Proposed: k, Lap Lot Coverage Calculations: ADU Created: (YES Subdivision: 7 --�- C) 0 Legal Nonconforming Land Use Determination Issued: (YES Comments Plan Review By: L Planning Data Form 07-14-09.doc L City of Edmonds I* Critical Area Notice of Decision Applicant: A t, f Property Owner: 1�.5 Critical Area File CI Permit Number: Lt> 9-oi ()o -)S-7 Site Location: Pt VJ Parcel Number: 00 3-710001)070 0— Project Descriptio n: -40- k4 I r e-�- ov, e- t F-I Conditional Waiver. No critical area report is required for the project described above. There will be no alteration of a Critical Area or its required buffer. 2. The proposal is an �Ilowed activity pursuant to ECDC 23.40.220, 23.50.220, and/or 23.80.040. 3. The proposal is exempt pursuant to ECDC 23.40.230. Erosion Hazard. Project is within erosion hazard area. Applicant must prepare an erosion and sediment control plan in compliance 'With ECDC 18.30. Ur Critical Area Report Required. The proposed project is within a critical area and/or a critical area buffer and a critical area report is required. A critical area report has been submitted and evaluated for compliance with the following criteria pursuant to ECDC 23.40.160: 1 . V' The proposal minimizes the impact on critical areas in accordance with ECDC 23.40.120, Mitigation sequencing; 2. V The proposal does not pose an unreasonable threat to the public health, safety, or welfare on or off the development proposal site; 3. The proposal is consistent with the general purposes of this title and the public interest; 4. Any alterations permitted to the critical area are mitigated in accordance w,ith ECDC 23.40.110, Mitigation requirements. 5. V' The proposal protects the critical area functions and values consistent with the best available science and results in no net loss of critical functions and values; and 6. The proposal is consistent with other applicable regulations and standards. E] Unfavorable Critical Area Decision. The proposed project is not exempt or does not adequately mitigate its impacts on critical areas and/or does not comply with the criteria in ECDC 23.40.160 and the provisions of the City of Edmonds critical area regulations. See attached findings of noncompliance. 52""Favorable Critical Area Decision. The proposed project as described above and as shown on the attached site plan meets or is exempt from the criteria in' ECDC 23.40.160, Review Criteria, and complies with th I e applicable provisions of the City of Edmonds critical area regulations. Any subsequent changes to the proposal shall void this decision pending re -review of the proposal. F� Conditions. Critical Area specific condition(s) have been applied to the permit number referenced above. See referenced permit nu ber for specific condition(s). ev\ Reviewer knature Date Appeals: Any decision to approve, condition, or deny a development proposal or other activity based on the requirements of critical area regulations may be appealed according to, and as part of, the appeal procedure, if any, for the permit or approval involved. Revised 12/16/2010 OVED B;FLANNING MONUMENT SET A CENTER OF Zone CULDESAC PER PLAT ENGINEERING Setbacks Required Actual ELEV. 385.58' Front 957 96th Sides e- Rcar q S Othervi to ,ht Heip ADDRESS 2250e, CI&TH PL. H. 1±t-" _P-"RC-E6 NO OOq5-7qOOOOO-7OO LE(S-AL DESCRIPTION, 5F-C.TION 56, TOVINSHIP 2-7. RANC715 5 -7 NE OU^RTER, K. EL15E f3Lr_ 000 1:;�-00 LOT SITE ^REA. 6)655 5OUARE FEET LOT SLOPE NORTH -SOUTH 555.00* - 560.010'- 25.00' 25.00 %/Ef;ZTICAL FEET- 25.5% 5LOPE15 I UTILITY 105.00 LINEAR FEET EASEMENT r-AL_CUL^TION 00 Hr=I,SHT A: 3q3 IMPERVIOUS C.O/ERA&E� B 55-7 C, . 575 R.E51PENr_E 1�520 5OUARE FEET (including overhongs) D. 552 PRiN/EY4AY 560 Sw3UAR. E FEET 1540/4- 555.00' ViALKINAY 50 5(5ZUARE FEET AVERA&E C�RADE- 555.00' Ar-TUALBUILVIN& HEh�HT- 405 16' TOTAL 2,130 SCAJARE FEET MAXIMUM E3UILDIN& HEIC51­17`- 410.00' LOT r_O\oEF;ZA6E. RESIDEW-f! 1.420 SGUARE FEET INC,. CO%.IEF;tEr> POF;ZC,HI=-S. C�ARAC�E TOTAL 1,420 5(5�UARE FEET 1,4220/505a- 16.4% 35% MAXIP'%)" LOT C-ONIERA&E LINE T_rpE AREA (SOFT) 1. EXEMPT exv� 2. FZEPLAr-,EIDP 4. 1 TOTAL 15' UTILITY� 0:2 510 :20 50 50 100 I EASEMENT' I I I i N SITE PLAN SEE &ENERAL. NOTES SaAL.Et I" = 20'-0" REPLACEMENT IS REQUIRED OF ANY PLAT IMPROVEMENTS THAT ARE DAMAGED DURING CONSTRUCTION SEE GRADING/TESC AND DRAINAGE/UTILITY PLANS FOR MORE INFORMATION PL PRE -DEVELOPMENT CONTOUR W, OLYMPIC MEW WATER AND SEWER DISTRICT SANITARY SEWER EASEMENT —SEE DETAIL ON SHEET 4 OF 4 0 0 STREET FILE RESUB JAN 11 �bll BUILDING DIPARUMENT CITY OF EDMONDS 0 I* City of Edmonds 0 Critical Area Notice of Decision Applicant: Property Owner: Critical Area File Permit Number: Site Location: Parcel Number: t) 0 3 -7 1000o 0 70 0— Project Descriptio n: e�j Conditional Waiver. No critical area report is required for the project described above. There will be no alteration of a Critical Area or its required buffer. 2. The proposal. is an allowed activity pursuant to ECDC 23.40.220, 23.50.220, and/or 23.80.040. 3. The proposal is exempt pursuant to ECDC 23.40.230. F� Erosion Hazard. Project is within erosion hazard area. Applicant must prepare an erosion and sediment control plan in compliance with ECDC 18.30. Ur Critical Area Report Required. The proposed project is within a critical area and/or a critical. area buffer and a critical area report is required. A critical area report has been submitted and evaluated for compliance with the following criteria pursuant to ECDC 23.40.160: 1 The proposal minimizes the impact on critical areas in accordance with ECDC 23.40.120, Mitigation sequencing; The proposal does not pose an unreasonable threat to the public health, safety, or welfare on or off the development proposal site; The proposal is consistent with the general purposes of this title and the public interest; 4. Any alterations permitted to the critical area are mitigated in accordance with ECDC 23.40.110, Mitigation requirements. 5. v**' The proposal protects the critical area functions and values consistent with the best available science and results in no net loss of critical functions and values; and 6. The proposal is consistent with other applicable regulations and standards. F_� Unfavorable Critical Area Decision. The proposed project is not exempt or does not adequately mitigate its impacts on critical areas and/or does not comply with the criteria in ECDC 23.40.160 and the provisions of the City of Edmonds critical area regulations. See attached findings of noncompliance, 52"'Favorable Critical Area Decision. The proposed project as described above and as shown on the attached site plan meets or is exempt from the criteria ih ECDC 23.40.160, Review Criteria, and complies with the applicable provisions of the City of Edmonds critical area regulations. Any subsequent changes to the proposal shall void this decision pending re -review of the proposal. F-I Conditions. Critical Area specific condition(s) have been applied to the permit number referenced above. See referenced permit nu ber for specific condition(s). V\ Reviewer §ignature Date Appeals: Any decision to approve, condition, or deny a development proposal or other activity based on the requirements of critical area regulations may be appealed according to, and as part of, the appeal procedure, if any, for the permit or approval involved. Revised 12/16/2010 ILIE "I D +q6t MONUMENT SET A CENTER OF Z r CULDESAC PER one _S�7% corflor PLAT ENGINEERING Setbacks IRSmcuired Actual ELEV. 385.581 9T_ 96th Front I I Sides e- Rear q 773, 10 Height ADDRE55 22506 cI&TH PL. H. TAX PARaEL NO LEC�AL 5ECTION 56, TOINN15HIP 21, FZANer= 5 PE5CF1IPTI ON' NE OUAFZTFFZ, K. ELisi E3Lr_ 000 0-00 LOT -7 1 51TE AREA, 8.655 50UAFRE FEET z T C-LQPF CA CA_ NOFZTH-SOUTH 555.00' - 560.00'- 25.00' 25.00 \/Ef;ZTICAL FEET= _25.5% SLOPE15' UTILITY 105.00 LINEAFZ FEET __: EASEMENT 00 HPI&HT CALCULATION IMPEF;ZVIOU5 CO\/I=-F;ZA(5E, A- 5q5 13 . 515-7 5-75 FZESIDENCE 1�520 SOUARE FEET (Incivc1ing o�erhctnqs) D. 552 ET VRI\/EP4Ar 560 50UAFZE FEET 1540/4. 555.00' V4ALr_k4AY 50 SOUAFRE FEET EI-I A,/r=FZA(5r= &RADE= 555.00' UAWE ACTUAL BUILDINr5 HEhSHT- 405 16, TOTAL 2.15050 -F-r= T HAXIMUM f3UIL0INa HEICPHT- 410.00' LOT r_OVEFZAr=E. FZESIDENCE !,420 5MAFZE FEET INC. CO\/EFZED F-OF;ZC-HES. CAFZAC5E TOTAL 1,42C) SOUAf;Zr= FEET 1,420/5.6595= 16.4-96 55% MAXIMUM LOT COVERA.OE LINE TYPE AREA (50FT) 1. EXEMPT 2. F:Zr=PLACE=P 5. NEH 2150 4. 1 TOTAL z 02 5 10 20 50 50 100 15' UTILITY I EASEMENT' L`1_jr___11 I I 'r- N PLAN 51EE C�ENIERAL' NOTES SCALE, I" - 20'-0" REPLACEMENT IS REQUIRED OF ANY PLAT IMPROVEMENTS THAT ARE DAMAGED DURING CONSTRUCTION SEE GRADING/TESC AND DRAINAGE/UTILITY PLANS FOR MORF INFORMATION ,<0050- � - , OLYMPIC VIEW WATER AND SEWER DISTRICT SANITARY SEWER EASEMENT —SEE DETAIL ON SHEET 4 OF 4 T ezYVIREE-T FILE RESUB JAN 11 ' P11 BUILDING D�PAWMENT CITY Of EDMONDS AT: TH Occupancy established by this certifi No. Stories:. 2 Automatic sprinkler system provided Ile 6TREET FILE DEPARTMENT OF, BUILDINGS PER INTERNATIONAL BUILDING'CODE-SECTION 111 Imonds -:Puilding Permit #: BLD20100757 te: R3 Dwelling Units: Type'6f C66 t� uction: VB Basement: — No' NoV Automatic gorinkl6t.�system required: No Owner of building: Clearwater Homes, PO Box�A'12'-IiMarvr;V"'iII67'WA�98270--��-- th \ ­u'-, J i The Sin-gle Family Residence at 22806 96 PlaceW Edmonds=-;-�--Lh;�s�:been,inspected and approved complying with the requirements of the 2009 edition of the International Residential Codd,,ag adbpt6d-byLthe�C-itk-f6i�-the/group and division of occupancy and the use for which the proposed occupancy is classified. Issued this 19th day of March, 2012 Chief Building Official z2 By: T71J . ........................ .. . Any change of occupancy or use requires a Wildin.g permit and anew Certificate of Occupancy issued by the City of Edmonds Building Official. M LIU & ASSOC.IATES, INC. Geotechnical Engineering Engineering Geology February 1-9. 2012 Mr. Bob Murphy Murphy Building. Company 620' ) — 202 ad Street SW Lynnwood. WA 98036 Dear Mr. Murphy: Subject: Final Inspection Report Single -Family Residence 7206 r- 960' Place W Fdmond�, NN.ashing gon L&A.lob No. 11 -012 ; 7- � , , 74 5 P I,- 'V / 4 �' J OX-D (0 7 ±;7 -7 Earth Science �40 MAR - 8 2012 BUILDING DEPARTMEN't CITY OF EDIVIONDS We have provIded geotechnical inspection services for the construction of the subject residence. Items we have inspected include. 1.) temporary erosion control with installation of silt 1'ence on the downhill side of the residence site, 2) cut bank stability evaluation, 3) footing bearifig Sol] v-erification. 4'.) footing drain line installation. 5) rain garden construction, and 6) final erosion control. Our Daily, Field Reports documenting our inspections oftbe above items are anached hereto for your rcvil-w. Based on our observations, It is our opirtion that the geolechnical construction work items listed above are CornpleLed in accordance with cin, approved plans and specifications, and is acceptable, Please contact us if vou. have questions. A Yours very truly,. J. S, (fulian) Liu, Ph.D... P.E. Consulting Geotechnical Engineer FARM 7/17/ ; Attach.: Daily Field Reports I through 5 19213 Kenlake Place NE - Kenmore, Washington 98028 Phone (425) 483-9134 - Fax (425) 486-2746 "REET FILE 01 DAILY FIELD REPORT J 101) No. Held Rep. Vage KePOA NO. 'm 0' LIU & ASSOCIA'I'ES9 INC. 11-012 J. Liu 1 of 1 2 2 ;Th G*)tech%9,.nl Engineering, Enginftying Geolop- & Earth Science miles 30 . On Site 1 1:45A Date 8/2512011 D a7y ' Thur. ur.] 19213 Kenlake Place NE TmM Time (Hrs) '71rne off site weatner Keninore, Washington 98028 0.75 - 112:115H Sunn� Vehicle Hrr. on Site ChaTW vtsftm Phone: (425) 483-9134 Fax: (425) 486-2746 JHM Projw Job Location client Single -Family Residences - Lots 7 & 8 226.xx - 96th Place West, Edmonds Murphy Building Co. General Contractor Genetal Contractor Superintendent Received Unchecked By Murphy Building Co. Bob Murphy Eaftwork.Conftdor Eaftwor�-Conlractor Supt. Reu*ved checked By A the request of Bob Murphy with Murphy Building Co.. I come on she today to observe installation of footing drains for the homes being constructed on the subject lots. At the time of my site visiL the footing drain lines of 4-inch rigid perforated PVC pipes have mostly been laid alon the perimeter foundations of the buildings, except around the garage where footing..drains, are omitted. The geotechnical report for this project recommended that footing drain lines be wrapped in nqn-woven filter �! o.r crushed rock. The footin fabric socks and completely enclosed in clean 314 to 1-1/2 inch washed!Rr�y ---9. drains are embedded in 3/8 to 1-1/2 inch washed gravel with a non -woven filter fabric liner covering the top of the washed gravel fill. it is my opinion footing drains constructed in this manner are acceptable, too. The fifter—I fabric should keep soil from migrating into the drain lines and there is little chance that the finer grav��l woull-pluq. up the holes in the PVC pipe walls. It is my opinion the footing drains are properly installed. 46 23i- A copy to: 0 Continued 1) Bob Murphy/Murphy Building Co. 2) on Next- 3) 4) Page _ DAILY FIELD REPORT Job No' FAWd Rep' I -age KepOrt NO. LRJ & ASSOCLAXES9 MC. 11-012 J. Liu I of 1 3 GemechnicMEnginwing, Miles 30 Time On Site 10:20A Date 12 11111 011 Fe Day of Week Fri. 19213 KenlAe Place NE Travel Time (Hrs) Time Off SJte �5 Kenimore, Washinotoa 98028 0 0,75 11 AUA Cloudy VeNcle HrS on bite Hts charged VISOM Phone: (425) 483-9,134 Fix: (425) 486-2746 Job Lo=Dn Crent Single -Family Residences - Lots 7 & 8 228)u�- 96th Place West Edmonds Murphy Building Co, General Contractor General Contractor Superintendent Received Unchecked By Murphy Building Co. Bob Murphy. Eaft.wk Contractor Earthvvorl( ConracW Supt. JR�e—d Checked BY. At the request of Bob Murphy with Murphy Building Co., I corne- on site today to observe the construction of the rain garden for the residences on the subject lots. A pit has been cut down about 2.5 to 3 feet below the existing grade for the rain garden pond. It is excavated Into a brown Sifty fine to medium sand with a trace to some gravel. It is my opinion that construction of the rain garden to date is according to the d I esign plans and is ap., Copy to,: Continued 1) Bob Murphy/Murphy Building Co. 2) on Next 3) 4) Page DAILY FIELD REPORT job NO, FlUd HeP� vage , KepOrt NO. LIU & ASSOCIATES, INC. 11-012 J. Liu I of 1 4 Earth9c—lancr mites — Time On Site M We [Jay of Week 30 9:15A 11/2912011 Tues. 19213 Kenhake Place NE Travel Time (Hra) Kenmore, Washingtoti 98028 0.75 9:3sA Sunny Vehide Hno on Site Visitors Phone: (425) 483-9134 Fax: (425) 486-27-46 Protect JoO Location client Single -Family Residences - Lots 7 & 8 228xx - 96th Place West, Edmonds Murphy Buildind Co. General Contractor Gneral Contractor Superintendent Received Unc#zcked By Murphy Building Co. Bob Murphy Eafthvmrk Contractor EartirAwk Conlya Supt. Received Checked By At the request of Bob Murphy "t Murphy Building Co., I come on site today to observe the construction of the rain garden for the residences on the subject lots. A precast concrete block wall about 2 to 3 feet tall has been constructed at north end of rain gard n p2nq wit� a plastic pipe sticking oui--of t.his wall to tarry stormwater of the residence into the rain garden. The bottom of the pond is lined with a layer of modified soil (soil mixed with organics) about 18 inches thick. Water discharged into the pond or rain water catched by the pond has consolidated this layer of modified soil some what. The_�ain q��5�n isy.�t to be planted. It Is my opinion that construction of the rain garden to date is according to 11!�e op�!Q-p plans and is.acce able. -4-A6 7/17/ Copy to: 0 Continued 1) Bob Murphy/Murphy BUilding Co. 2) on Next 3) 4) Page DAILY FIELD REPORT L11J & ASSOCIATES� INC. Job NO. 11-012 F"I Rep. J. Liu Vege 1 of 1 em Gmectmial Enj�neain& En&e� Geott)&y & Euth Sciana Miles Ime 7-35P ate Day of Week 30 12, 21297/21012 Wed. Travel rime (Hrs)— e"t1h. 19213 Kcniak-e Place NE Kenfhore, WasWngtm 98028. .0.75 i:OOP Light Rain Vehicle Hrs on Site— Wrs0jg—rgF— ViErs Phone: (42-5) 433-9134 Fax: (42:5) 486-2-746 4 1 - j protect Job Locamon Gfient Single -Family Residence - Lot 7 22806 - 96th Place West, Edmonds Murphy Building Co. General Contractor General Contractor Super1rd, endent Recewed Unchecked By Murphy Building Co. Bob Murphy Earthwork Contractor. EAfftmuk C4mtractor Supt. Received Checked By the request of Bob Murphy with Murphy Building Co., 1 come on site todaylo conduct a finai inspecti . an on permanent erosion control for the subject residence, At the Ume of site visit, the unpaved ground vAthin the r r esidence site has all been landscaped and is either covered by lawn grass of py shredded bark. There are no [At igns of erosion within the site. It is my opinion that erosion control for the site is now completed. s sil Copy to: [3 Continued 1) Bob Murphy/Murphy Suildina Co. 2) on Next 3) 4) Page _J I . �.- !P" . Lot- -7 Z-noce q�� �Lw HUT& ASSOCIATES, INC. .. . ..... ... ** .. .... . . . . . . . . ........ ............ ........ .......... .... . .. ... .... .... ... ... j u 1� f I �.. 2 0 1. 1 Nlfr� Bob Murph), -:o, Murphy --Building( mpam 6203 Street SW Lynn -wood, WA 98036 De.�.ir -.N11%, �Ytvvp�y. Subj,-�-ct: Rahn* Garden for Storyn.w"a-ter DisposiM 'Three Single-Fau-jily Residences 2249xx — 96", Pl.ace W Edi-nonds, Wwshint'�"Ion' L& A Job No, I 1 -0 1 41. INNTRODITC.TION' S*or- d* ^or the We -und-erstan.d that a'rain. g,�irdanis now b��Ii-�g cojisklert�d. fior a r isposal. f reside-ri.ces,to be constructed on Lots 7 and. 8'of pro.ject. This raili girdLi-i is to bQ locatediri. -,i flat to gently . siope(.1 arca at the s,(nah end of a -50400t-vvidk� --aseinem travershig, the �,,We of the subJect The stubstidue condition of thi-s arezi wa,-.,- previously explorled by mo te,,.t pits� vvith th.o k-yas of these test pit--., pres-.11ted. in our Addenduin No, i to.. our, 3/1 T:'27,011 origin.,M ot��.ctjnical roport.- Presented in -t.lqis repori zj, . t Teour rt�comnicndatjolmi -for fl.e rain m St) . BSURFACE CCIN"DrrION SoU C'ondftMn - o -j wo-e 7 Fhe. two test pits excu'vated in the ,�rea f the propos.ed rain ga-�dej. mxcavated, t-o depths of 6-5 to L15 Qt, B-oth t-*--st pit..; encountercda lmer offifl. as much as 3.0 1.�'Cet 19213 Kenlake Place NE ^ Kenmote, Washington 98028 Phone (425) A83-9434 � Fax (4-275) 486-2746 JUL 0 5 2011 STREET FILE BUILDING DEPAVVENT CITY OF EIDMONDS 13L-020/0-07-5-7 Jv ly, 1, 2011. Three Singl.,e-Famfly RO'Sidences -I.A.A.Job No. I 1 -01. 2, thick and a I�ver of relic toj.)soil of 1xichve, thick.. 'Dw fill is de�,.m wid appc.trs to h.avc been compaued to certain degree. Under.1virig -1he rellic topsoil. is a layer ol: med itun- .1 den -se "veathe-rQd 'goil of silty t.) 'e sarid N;vith a trace of .11 gravel.. up to 3,10 ff�ket thitck-. Bem,4wh ,hii lavcr of weathered soil is a liwcr of ftcsh till. Soil Of Ii-N-gray. i wakly- C'umented. cx.tinauely low peri.iwability, slh�v fine sand, up to about 21,0 fcet thick, This fresh till to the depth explored k. a fresh advau", ow.,,v-asli ewpci�i( of gray. den'se. gravolliv. mediu-nn uo ccarse sand of ujoderatol-v. hi�zh Permeability. Groundwater Condition Groumdwaler Was, not encountered tw eith.er te.�t pit�. exu.Vatcd in th�e proposed. arca of tho rain garden. Smce -stormw�i.kr c.an infllfr�i.te imo "Aie undorking AN; nu buvivash deposk, there -fore, hrigmet of - ound-water on el-w rain gurden st-10u."'d I')-o GEOLOGIC HAZARDS T"he area of the pro�p�-,�sed rain garden is n-jallflod by a lover of compaew,,d fill. with a thii-j- I ay cr T of mlic t-qrpsoil beneath. Jlw r;dic lopsoil is mideiimdr,� b-,-, y-denw till aad kimse fo hi, a -�dwlxjc- outw-ash 5wik, basal so,:Is an', o4 vm -high v,,h shoz .- stmm <; h -z a, agpfl.�! stop-, I-ailure. Tht. area is flat. to ger3fly sl�ptd and the basal soils. c0oiz C, hazw- m t�h m., of hig,"'I against �rosioa,- M, W." na-,-o kind"'Iffle arj�d W" occur i,---I ffic a rnininjal. LITj &- ASS-SOCIATES, INC Jut; 1, 2011. Three sillgb�-Faplfly 1A.A.Job"No. 11-01.2 INgn 3 RECO NNENIE N DATIONS ("'eneral Bfised. on. Condition by Ibe, bx,o 11�,;! piw,*, ir fl.r.1c of`fl)�. proposed rah! gard;,-n, it is ou.-r, Opinion, dult it is suitIbit, to """',rden -1.) dispos,- !,o txt ^,;' ��-ad P, of ih,� �ubjev pryom ..u, provived K son u��iQd in v)�- flesign of the rahi gardal and fulh w W1 &0 mai olien dynod at w mcfac man 410 1 K 1 A pond of v July 1, 2011. 1.1-irce Sinde-Fami1v Residences Lek.A. Tob No, 11, -0 12 PaGe 4 V Phuits of She, rain garden should be tolerant: of pon.diiig. vvatcr and saturaued soil condition.s. u-I. th.c -Svirlmr. -allm.i.ths imd. d-lought. irt th�e nlonth;,, III ger-e-r-al, the prcdomit"'ant plants, 111houtd. bQ of facultativ--e- �, ecies adapted to stresses associated, vvit.h. �-vet dl-% P. conditions. dIC I-',IjTl � �. Y ck).Mpmse of red, twig dogwomf. F-11"I"es -1 .1 - .1 gardt!nplam, juay 1, - Ncugu-j. ml III jultim-ly �Ijlu o-villuc-11%, alm an Iuyclj Icm.N, 'it" mziv%�-u ligularias or vuricyus primroses. Erosion 111M.i.figation Vegetall.on outside. of fimils should be: prescncd atid maiw:;dnecL Ple Surficial tolns�);l and. Weathered scril drapin.2 the -�Ioj-w ahovc ubc i-ai.vj. pr&rx contaill a high pt�-rccyllfqsc- of fir-C."i vvilic'n are seln-,J(ivi� lo, -moisture .,Md ctm be A�asi,lv disturbed by constructiu-n. uaKlz, A ia'yt�r of dlewi� 2-w--I-inch qiu,irrv- 'Spalls -'rhoul4d bc placed c-.,:ver are -as of frerquent tra-Fric.. siuch as the rainp to and from the rain gardc loc-afion.. as reqp-ireal, to protect thc -,,ubgradc soils *om disturb-ance by corlstrtict.1011 rTaffic. A silt- fl�enc,C -A.ould. bc hns talk lt�:d. ulon..g fl-ic do�uhifl �idles of wm,�Arucflon area, lk� fl,1,611i.1111;�c trarisport of slediment ordo neighborii),g propertie.s or th M. L� c �crcae, Thc bou .1ai of du� filfter ol'i.b.c S�11 11,6-jus sbould ir, ancl-w*ed j-n a trcrich FiLled svith onsito- 's,0D.. Di,slurbcd arras and artm-, devciid of-vq,�i�tadnn cm 1hc, -.Jo Zl.> p- ni activitiei �51-)oudd bc- m-weded anct re-veg�cm;,Puj as, -,-,00n as possilmle, (,A,�.fluntnam-A 5torllvwater sbf.),uld, wil. be dlsdizu,�-,,jed orak) the �Ao;pe,- Roriil�m--,Im LTU& ASSOCIATES. INC. J b ly 1P 2, () .1 t llra Res-idences L &- A Job No. 1. 1. -0 12 Page. 5 ill.1perviollk svdace,�, Such al") raofs and p�avcd dri've.-tvays, should be capa-ured by an undergowid drain line sysiem connectiA toroof dovviispoots or by clatch ba.shis- instalhcl AV i Ile. III pavtd dr'- ;nvay, wat -r collectiA [-),� thts�� drah). �.i, hould b-, tit'jillined to, discharg-c into a stonn s��vwr or Suitatle stormwate.r disposal cl* 108 UIR- E We are pleit3cd to b,� of sel.-vice to you. oll th'is Neake f'eel ftct� to comact Lis if you "WVO all' OUCSdODS re.gArding this rcp�.,srt orric-d.fi-Ortha Your,-, vely truly, &.,,\SSOClA.TES. INC. S. O*ulian) Liu. Ph.l.-Y, P.E. onsul . in 11 , LRJ & ASSOCIATES. INC. LIU & ASSOCIATES, INC. Geotechnical Engineering Engineering Geology June 27., 11-011 Mr. Bob Murphy Murphy Building CornpanN 620-33 — 202"' Street SW Lynnwood, WA 98036 Dear Mr. Murphy'. SUbJect: Rain Garden for Stormwater Disposal Three Sinale-Famik; Residences ?? 8XX — 4"' Place W' Edmonds, Washington L&A Job No. I 1 -0 12) INTRODUCTION Earth Science We understand that a rain garden is no-w being, considered for stormwater disposal for the residences to be constructed on Lots 7 and 8 Of the SUbJect proJect. This rain garden is to be located in a flat to gently sloped area at the south end of a 50-foot-wide casement traversino the east side of the subject lots. The subsurface condition of this -area Nvas Z� previously explored by two test pits, with the logs of these test pits presented in our 051/031120 11. Addendum No. I to our "17/201.1 original geotechnical report. Presented in this report are our recommendations for the rain garden. SUBSURFACE CONDITION Soil Condition The two test pits excavated in the area of the proposed rain garden were excavated to depths of 6.5 to 121-5, feet. Both test pits encountered a layer of fill as, much as 3.0 feet 19213 Kenlake Place NE - Kenmore, Washington 98028 JUL 0 5 2611 Phone (425) 483-9134 - Fax (425) 486-2746 BUILDING DEPAR—IMENT STREET FILE cITY OF rMONDS ?3t-r) 2-0io- a -7-S-7 June 27, 2011 .Fhree Single -Family Residences 1, &A Job No. 11-0 12 Page 3 RECOMMENDATIONS General Based on the subsurface condition encountered by tile two test pits in the area of the proposed rain garden, it is our opinion that it is suitable to use rain garden to dispose storrnNvater for the residences to be constructed on Lot 7 and 8 of the subject proJect, provided the recommendations in this report are used in the design of the rain garden and fully implemented and observed during construction of the rain garden. Design of Rain Garden We understand that the proposed rain garden is to be about. -2 to 3 feet deep. If th e bottom of the rain garden is to be cut into the relic topsoil or the niedium-dense weathered soil below the relic topsoil, a desi- infiltration rate of 0.75 iph inch per hour may be used for the design of the rain garden. If the bottom of the rain garden is to be cut into the advance outwash sand deposit.. then backfilled with clean, graNelly., fine to coarse sand N,vith nominal compaction. a design infiltration rate'of 1.5 iph may be used to design the rain garden. Construction of Rain Garden The cut slopes ofthe rain Parden should be no steeper than 3 )11: Ill. The pond of the rain ,.,arden should be lined with a laver of amended soil at least 18 inches thick. 'rhe amended soil should have 30 to 35 percent of compost tilled,into the rain garden native soil to achieve a n or anic content of 100� b\ dn w-eight. 9 0 Y Y LIU & ASSOCIATES, INC. June 27, 2011 1-hree Sinale-Family Residences L&A Job No.. .11-012 Page 4 Plants of the rain garden should be tolerant of ponding water and saturated soil conditions in the winter months and drought in the sumnier months. In general. the predominant plants should be of facultative species adapted to stresses associated .�,ith wet and dry conditions. 'ry, ically, the rain garden plants may comprise of red twip- dogwood. rushes. . p w w - - sedges. sahnonberry and vv\.-inberry� and ornamentals Such as royal ferns. big -leaved ligularlas or various primroses. CLOSURE We are pleased to be of service to you on this prqject. Please feel free to contact us if you have awy questions regarding this report or need further consultation. 00�" G I �� �.A Yours vefy truly, LIU SSOCIATES. INC. S J. S. (,Julian) Liu, Ph..D., P.E. Consulting Geotechnical *Engineer LIU & ASSOCIATES, INC. I p i. LI-U & ASSOCIATES, INC. Geotechnical Engineering Engineering Geology Earch Science Mr. Bob Murphy Muirpliv Buildillu, Company 62203 - 202", street SNV Lyi-iiiwood. \VA 08036 De'ar Mr. IN.-lurpily: Sublect: AddeML1111 NO. I to 311 7/20 1, 1 Geoteclinical Report Three Simule-Family Residerices 228xx - 96"' Place \V L"Arriorlds, Wasli I ]I (-)toll L&A Job No. I 1-0 12 INTRODUCTION 111filtration tre.iiches are plawied to dispose slormwatel, ollsite 1,01. [lie 1\vo I-c-sidellces to be con�;tructcd oil LOLs 7 and 8 of tile ,LIbjCC1 Pl-( 'eCt. Orlginallv. tre"ches were to be located iri the area of ceiitral cast side ofa 50-l'()ot-\vIdQ easemerit Zibl.lttillL' il-le cast side ol'L.L)t S. 'Hils Is arl area alolig, tile base of a steel) slope coilling, dowil fi-oill tile west side arid desceilds eastvvard arid drops a few feet dowii to a ricluliborim., property. It decided this may not be a suitable location for the Irifiltratl0ii trei-iches aiid the gentl\-slope To flat SOLIth ei-ld of ti-ii-I easernerit iicar I-I'dinonds Way iiow tile s I iori li-ei-ictics. ']'Ile S1.Il)SLII-1'1'IC;2 elected arca fi,r irifiltrati condition of this area \.\as explored by t\\.:o test pits. (XII' 1-ii-idiiigs ai-id recomilleridal 1 oils 1'01' infiltratioii ti-criches to be C011SIRICtCd III Illis area are prc.scrited lit this adderidw)i. SUIBSURFACE CONDITION Soil Condition Tile SL1bSl-ll-f'ciCC C011diti011 dt (Ile NOL1111 elld of 111C eMS0111CIII. .]List 3101`11) Of l:'.'dIll0lldS \Va\.- \V"IS explored witli two pits. 'I"'llese test piTS ":CI'C CNcavatcd oil April 2 1 . -?(. . H 1. \\�Itli -,I track-moui-iied 19213 Kenlake Place NE - Kenmore, Washington 98028 Phone (425) 483-9134 - Fax (425) 486-2746 RESUB MAY 18 2011 DING DEPARi-MENT 0""TmEET FILIEL, zj 9 1 TY OF EDMONDS I �P- May 3. 2011 Addenclum'No. I to 3/ 1 7:�20 11 Geotechnical Report -HII-ce SlnLde-F-amlly Residences L&,A Job M). 11-0121 Pa a c 2) backhoc to dcpths fi-om 6.5 to 12.5 feci, The -c-1pproxilliale locations of' these mo test plIS. dc"lu'llated Lis I-cst Pits 6 and 7. ar%� shown on PkIIC I - Site 111d l--'Xj)l0I'dtI0Il LOC,111011 Plill"l. The test pitS Wel-e 10C,�Ited Witil Vi-SLI'l Nl'el-ellCe to existllll-, 101)01-11'�Ij I e 1 11 11 �11'C I' ',ILLH-eS III tht I'leld "Illd 01) tile topographic sLjl,\,e\ 1711M). 111(1 their locakons should he considered onl\- is accLII-LItC tO tile llle�ISLII'1111-1 Method Used. A oeolecltil,cal enulnecl. t - rom our office was prescm during, subsurface eNplol-atioll. Who emamined the soil and gcolo-IC COIIL[16011� eI1C0LII)tCIVd MICI C0111pletCd IOUS of test piIS- So C, - samples obtained from cach soil LIllit ill thO ICSt pitS Wel-C VIsLially clas'sliled Ili genend accordance wilh Linlied Soil Classitication Systcm. a copy of which presented oil Plate Detailed (leSCI-lp(IC)IIS OCS011S ClIC0 Lill tel-Cd I)V test pit are pi-csented Ili dic wil IoL-, oil Plaics and 7. Both tcSI pits encountered a laver of compacted dense ]ill Lip to —0 feet thick. Underlying the 1111 is a laver of, relic topsoil. about 9 HIC11CIS thiCk. ThC (0f)SOII iS Llildt�ltllll b\ a laver of ol-all'-'e- brown cathered soil ol, illedlum-dense. silty I ine sand with a trace of* gravel. ill) to ".0 fect thick. Beneath this ]a\-er of weathered soil 1�� a 4o-er ol, till soll ol, hidit-u'l-LIN. wealdv- cemcnied. silty fine sand. up to 2.0 fect thick. L.,'ndcrlying ihis fresh till I0 thC &PT11 eNp101-ed IS J . C, I'i-esil �jdv-L-jljce olitwasll deposit of gra\. k-.lejise. gravelk. llik�dil-llll to CoLll'se SIjld. (';roundwatcr Condition I CNC'I\ ated 1he proposed area (11' (11-01.lildwatcr was ]lot C11COLImered b\1 cithcC cdtll,� Iwo pits infiltration trenches ill the easement. The test pits WCIV CNCLIVLItCC1 Ili a wet carly Spi-1110 following a wry wet winter. Thei-cforc. it is our opinion Impact ol'ground\\Liter on thtf proposed infiltration trenches should he minimal. LIU & ASSOCIATES, INC. ILI May 3.2,oil Addenclum No. I to '/17/20 11 Geoteclinical Report Three Single -Fall -illy Residences L&, A .1 ob N o. I 1 -0 1 Piae 3 RECOMMENDATIONS C"cileral I�asccl on the soil condition C11COLIMCNd hy test lilts excavated In the arca ol'proposed 11,111ir"Ition tl-endle.S. it IS 0LII- 0I)II11011 that tile SOLIth cnd ofthe casement ,1101.11d he Sl.lit-Llble I'01- tile SillnL' 0i' I The clean gravelk nitcliuln to coar-�e I trenches. del)oSit enC0LIn1CI-Cd bN the le -St Pits SI10LIId be able to support Infiltration trenclics for onsite stormwater disposcil. The boliom ol' infiltration trenches should be cut at least. 6 111C)ICS Into the Widerlying, LAdvance OLIM"'iSh depoS11. Construction Of Infiltration trenches SI10LIId be monliored I)v a (gotcell"Ical elhilneel'. Design Infiltration Rate One soil samplc obtained at 7-5 I'eet below grade froin Test Pit 6 wai selecied for Parlicle Sl7e DISO-1111.16011 teit in laboratory to determine tile lilt H tratio n I'Me ol' the UdVallCe offlwa�h deposit. The report ol'this test is presented mi P]ate �A- I W attached APPENDIX. -�s 11omi on the Panicle Slzc D s I r. -)I1 repol.l. Ilic soil was composed (*)I' uravolk. line to coarse sand. with a clay content and uravel;'.sand C011MIt Ot'94. I Accoftill 1'-' 10 (Ile USDA -FCXLLli-e Triangle (from U'.S. Depailment of Al.!I-ICLI[Wre). shown In Plaic A-2 in attaclied Appendix. this soil sample can be ckissifled as -sand". The Dj,) size of this -",)I] s�Linlple (the size t)i' 10%' pLjssiIj,-,) is 0.114. Accordina, io 'rable ',.7 dthe Siormwmer Management IMOIILI�ll Ibl' W7estel-n \Va --,,Ii i nu, ton.. -M5 bv \Vashinuton State Department ol'1--cology rct'eri-ccl to as the I )0I.` Manual). showil oii Plate A-2 'M attached AppendlN. [lie estimated loijo-lCrill (CleSioll) i ale s .0 '1) 1 I- , Intlill-aTI011 Y i -' . I I (inch per hour) based on a correction faclor of 4 oil a shorl-terill Infillnition rate ol, 's 1ph Iol, LIU & ASSOCIATES, INC. May 3, 2011 AddendUm No. I to 3/1 T-120 11 (Jeotechnical Rcport Three Single -Family Residenccs L&rA Job No. I 1 -0 121 P,iL,,c 4 I. ..,anc cl -cd Lill Llie PUNICle SIZC D'Stl-*1711.111011 ICSI kill Ole ',od �amplc obtaim�d II-0111 (Ile ., F. 13- s I I I OLII\\,-tl,il klep(-)Slt III TCM I'll 6. the DI, size ol'this soll samplc Is 0.114. Ak�corkfing, it) *1 ahle 3.8 of the DOE Manual. shown oil Plale A-4 Ill the -Littached Appenclix. the estimated lom--term illf-1111-ation I-3te is 3).5 Iph for Dic = 0.2 aild is -2.0 1ph for Dj, 0.1. BN I[] Lk:]'I)ol'it 1011. thC estimated loll,-, tcrm infiltration r.,Ite for the soil sample ShOLIld be -2.315 1ph \\-]ill Dj,; = 0.1 14. Based 01) the above. wc recomincild a design long-term Infiliration rale of.'.() iph be used for the infiltration trenches to be constRicted ill thC S(-)LIth end area ofthe 50-1-`60t-\\-Id0 Oal,0111011( 1-111LIRMLI the cast side o['Lc)t 8. with the bottom of thC ti-ClIC11CS CLII �-It ItList 6 Inches Into the cleall .-,alld soll of' the advance OUtWaSh &IN)SNI. The I'elllaillim! recolillilcildations fOr the desh-m and construction of the infiltration trenches In our 17/2-011 2eoLeChilical report should still applN CLOSURE NVe Lare pleased to be kit' ser\ 'ICC 10 \:Oil (M proJect. Plezi"c I'leel fi*c,: to contact Ll�, 11'.\OLI hl1\e MIN: ClUeS11011S regardinul this report or 11ced 1111-thel- C011SLI] Wt loll. 4 Attached: Plates I. ',. 6 and 7 and Appendix Y 0 UrS \� e I'\' I I- LI I \ . LIU kA-SS0(.-lA-I-I--'S. INC'. S. dullan) L.M. Ph.D.. P.E. ('01"ISLI111thl' GIC(ACC1111ICill I-IlLilleel, L111 & ASSOCIATES, INC. LI U* & ASSOCIATES, INC. Fnninfzeiino - FnaineeiinU Gtulcxiv - Earth Scl--�nce — . - - z J 0 SITE AND EXPLORATION PLAN THREE SIGNLE--FAMILY RESIDENCES 226XX - 96TH PLACE \A/EST EDMONDS, WASHINGTON JOB No 1 I DAJE 4WS/2011 I PLI"JE UNIFIED SOIL CLASSIFICATION SYSTEM MAJOR DIVISIONS GROUP GROUP NAME SYMBOL % OR A VEL 'D r-, t-1 CLE A f� GW '!�'E LL-IS -D-E -,F,*,-. EL, F i I; E T.'_ �,E MORF THAI! G RAW E L GP P R L -G. P E D G� A GRAINED FRACTIC,114 GRAVEL VVITH GI\/j SOILS f,,' C, 4 S I =_ V FINES GC SAND C L E r", N SW L L D I %Q F 1; E T C P. E. L 1 r-00RE THAN 50"A.. r0ORE THAN 500k, OF SAND S P p Cl p E L, S"ki'i i_- SAND`A/ITH SM 7,, RETAINED C+! I -HE C 0 4;. R S E F R.A C T 10 r,l '10 �,LS*�,if,]G -4 ,-,!EVE F I � I E Q S C FINE- SILT AND CLAY INORGANIC IVIL SILT CL CLAY GRAINED LIOUID LIMIT ORGANIC OL DRGANI'l SOILS LESS THAN 50'.�,, IVIC RE T H A 1%) 5 0`11, SILTY AND CLAY INORGANIC MH SILT Y. ELAc,:.T,-,' S. LI' CH Cli 1­41G�l PL L 1,Ti,--17 (',LA PASSING ON THE LIOUID LIMIT ORGANIC OH ORC-Af li"--' S;LT SILT NO. 200 SIEVE 50"4, OR MORE HIGHLY ORGANIC SOILS PT P E A -1 A Id D , 0 1 H E R I I I G'HLY '� P G;� N; C z� L C NOTES: SOIL MOISTURE MODIFIERS. . -D CLAS:FICA�lCiN :S BASED Of. -I �-,IISIJAL E),ANII-N�TIOH -IEI IF Y 1 'e. L; T a. B S E i R� E !_': F M' - I 0;; S C� I _ 1; - I r, E N E R 28. L a C C (:) RD'i" ;, J C E VV 11 - H S T N1, D 2 416 - 8 THE 2 SOILCLA'SSIFICATION USING LABORATORYTESTS IS BASEL" ON ASTM D2487-83. MOIST - DAMP BUT NO 'J'v'ATER 3 DESCRIPTIONS OF SCIL DENSITY OR CONSIS1 E NC f ARF V E RV I,.,! C.- i S T - V E PY DA bvl fvIC I S -I U P. E P E: I � T T THE 'I --'H BASED 0N*ItlTERPRFTATION OF BLO�,V-COUNT DATA. VI�UAL VIrET - Vl�jSLE. ER OR IIAT tjpiTH; ;�PPE.%R_�NCE rW: SCILS AND -OR TES7 CAT-' FT FRI_.;v� r.F 'VvL T 7 R I 2L:: LIU & ASSOCIATES, INC. UNIFIED SOIL CLASSIF ]CATION SYSTEtVl Geotechrical Engneering Engineering C-eoiogy �7,ziriii science PLATE 3 Logged By'. JSL TEST PIT NO. Date� 4/21/2011 7 Ground El. Depth ft. USCS CLASS. Soil Description Sample No W 0110 Other TE-st Sm Grass and brush on Surface Gray, dense, gravelly. silly, fine to medium SAND. some sri,.@Il 2 wood and root fragments. moist (FILL) 3 ------------------------------------------ OIL Dark-brovin, loose. organic, silty fine SAND. mom 4 __4.rek_T0R_1:',01L4 - — — — — — — — — — — — — -- — — — -- — --- — — — — Sm Orange-biown, mediLim-clense. silty fine SAND, trace gravel. 5 Moist ------------------------------------ 6 Sm Light -gray, very-clense, silty fine SAND, weakly -cemented. 1110ist (fresh VASHON TILL) SW Gray, dense, gravelly, mediUM to coarse SAND, moist (fresh ADVANCE OUTWASH) 10 Test pit terminated at 9.0 fi, gioundwater not encounieied. Logged By� TEST PIT NO. Date: Ground EI Depth usc Sample Omer ft. CLA Soil Description No. U! Tes! 2 3 4 5 7 8 9 LIU & ASSOCIATES, INC. Geotechnical Engineering - Engineering Geology - Earth Science TEST PIT LOGS THREE SINGLE-FAMILY RESIDENCES 228XX - 96TH PLACE WEST EDMONDS, WASHINGTON JOB NO �Tg. 4/2,1/2011 1 PL;'�.TE- APPENDIX Particle Size DistribL10011 TeSt RCI-MI-t Three Sinule-Famliv Residences h 228xx — 96' Place \k"est Ednionds. NVashill0toll c LIU & ASSOCIATES, INC. 00 90 elf U-1 Bo Z F- Z 50 LU U W 4U - 3A 10 ()H "on ASTM C1 17/136 Particle Size Distribution Report L h N 100 lu N ot. % GRAVEL % SAND FINES CLAY % COBBLES E R UM FINE CRS. FINE C S MEDI SILT 3.1 (o 6.6 21.1 2 SIEVE PERCENT� SPEC.' PASS? SIZE FINER PERCENT (X=NO) I in. 3.4 in. 5�;S in. S J. 1/2 n. 3/S In. T;A -/ 2. 3 410 61.6 440 4 216.2 1: 4, 1 00 5.9 0.03,29 4.7 0.0710n;1M. ;.5 0.0087 inni. 2.8 0.0061 rnni. 2.9, 0.0031 inn). 2.7 0.001.3 nim. 1.3 'rest Pit t� (I gand Soil Description Atterberq Limits PL= LL= Pl= Coeff icients D85= 13.5 D60= 1.52 D5�)= 0.935 D30= 0 321 D 1 5= 0- 15(' D,lo= 0.11- ct,= 13.40 Cc--- 0.60 Classification USCS= AASHI*O= Remarks As delivered by clier.1 oil 4�22-2011 T-'.1v[.=03-: I Sample No.: 'Q75-- SourceofSample: Date: 5-3-20H Location: Elev./Depth: -;.i' Client: Project: '11011 M" CI`10 IEC�a F�oje�ct No-._ 09.1 1-2S Robert Aikman FL�-\-Tc- A-I--i j CITY OF EVERETT STORMWATER MANAGEMENT MANUAL Figure 9.1 USDA Soil Textural Triangle Table 9-t Recommended Infiltration Rates based on USDA Soil Textural Classification. *Short -Term CorrecOoll Estimated Loji—Term Soil Textural Classification Infiltration Factor, CF (Design) Infiltration kate Ri (e (in./h r) (i n./h I-) Clean sandy gravels and 20 to aravelk, sl.lnd-q (i.e.. 901,110 of the total soil sample is ictained in the �10 sieve) Sand 9 2 Loamy Sand 2 4 San& Loam I It 0,25 Loam O.i 4 0.13 *From WEF/ASCE, 1998. Volume /11 — Flow Control atid Treatment 9-7 Correction Factors higher than those provided in Table 3.7 Should be considered for situations \vhcrc lonu-terin maintenance \vIII he dMICUlt R) Implement, where little or no prcti-catnicril. is anticipatcd. or where site conditions are highly variable or uncertain. These situations 17CCILlif-C thL use of best PrOFCSSional Judgment by the site en-Ineer and tile approval of the local jurisdiction. ,%it Operation and Maintenance plan and a Financial bonding plan may be rCCILIIrcd by Ole local jurisclictioll. 2. ASTM Gradation Testing at I:Ull Scale Infiltration Facilities g As an alternative to Table 3.7. recent studies by Massniann and BUtChal-I (2000) �ve;­C used to develop the correlation provided in "I'able 3.8. 1 hese Studies compare infiltratiOn Measurements from Full-scale infitratiOn f1loilities to suil oradation data dcveloped u,.,Ino the ASTNI procedure (ASTM D422). The primary source ofthe data used by Massinalln and BUtchart \vas firoin Wliltsle (1998), \vho included limited ini-Iltration Studies oil]), oil Thurston County sites. Ho\vever, Massrilann arid BLItchall also included limited data from Kinu, arid Clark Count,%- sites In thc1l, analysis. This table provides reconi ni c tided long-ierni infiltration rates that have been correlated to soil gradation parameters L[Sin(l tile A�TNI soil gradation procedure. Table 3.8 can be used to cstiniatc: 1011-1,C1111 desi(_,n infiltration raics directly Front soil gradation dala, SUbJCCL 10 tile al)PI-OVal OftlIC IOC-31 .jurisdiction. As is true of'Tabic 3.7. the lon(--terni rates provided in Table 3.8 represent averag conditions regarding site variability, the deorce of lona-term maintenance and pretreatment for TSS controf. The long-term ini-iltration rates in Table 3.8 rnav need to be decreased ifthe site is lliLIil\ variable, or if maintenance and influent charact.crIsLics are not well controlled. The daui that forms the b�isls fior Table 3.8 was from soils that Would be classified as sands or saiid\ -ravels. No dala \vas avallable for finer soils at the time the t1able was dcvcloped. Tlierei'Ore, Table 3.8 should riot be uscd for soils %vith a d jo slic (10% passing the "I/C 11sted) less thall 0.05 ilini (U.S. Standard Sieve). I Table 3.8 --Alternative Recommended Infiltration I Rates based on ASTM Gradation Testing. ].)to Size from :ks,rNi D422 Soil Gra(lation Test (nmi) Estimated Lon—Tei-ni (Design.) fill-1111-a(ion Rate (in./hr) i 0.'1 3 0.2 3. 5 0.1 0.05 0.8 Not recommended tor treauncut Refer cc) SSC-4 and SSC-6 Ibi ticaunent acccpwhifily criteria February 2005 Volume Hydrologic Analysis and Flow Confrol BMPs 31-77 r L IU & ASSOCIATES, INC. &D aOl 0 0-7'5 1 'za S 0 C1 Lo +- P I, W LOT I Geotechnical Engineering Engineering Geology Earth Science March 17, 2011 Mr. Bob Murphy Murphy Building Company 6203 —202 d Street SW Lynnwood, WA 98036 Dear Mr. Murphy: BUILDING DEPARc7MENT CITY OF EDMONDS Subject: Geotechnical Investigation Three Single -Family Residences 228xx — 96th Place W Edmonds, Washington L&A Job No. 11 -0 12 INTRODUCTION We have completed a geotechnical investigation for the development of three single-family residences, located at the above addres s in Edmonds, Washington. The residence on Lot 6 has had its foundations already poured and construction of the other two on Lots 7 and 8 is yet to start. The general location of the residence site is shown on Plate 1 — Vicinity Map. The purpose of this investigation is to characterize the -subsurface condition of the residence site, evaluate feasibility of onsite stormwater disposal and slope stability, and provide geotechnical recommendations for onsite stormwater disposal (if feasible), grading, slope stabilization, erosion mitigation, drainage control, and building foundation support for the residences. Presented in this report are our findings, conclusions and geotechnical recommendations. PROJECT DESCRIPTION For our use in this investigation, you provided us with topographic survey and plot plans of the three residences. We understand that all three residences are to be above -grade, wood -framed 19213 Kenlake Place NE - Kenmore, Washington 98028 Phone (425) 483-9134 - Fax (425) 486-2746 March 17, 2011 three Single -Family Residences L&A Job No. 11 -0 12 Page 2 structures supported on perimeter concrete walls and interior bearing walls and columns. Due to the sloping ground within the lots on which the houses are to be built, some cut and fill may be required for construction of these residences. SCOPE OF SERVICES Our scope of services for this study comprises specifically the following: 1. Review geologic and soil conditions of the site based on a published geologic map. 2. Explore subsurface conditions of the site with backhoe test pits to depths where a firm bearing and/or percolable soil stratum is encountered or to the maximum depth (about 10 feet) capable of by the backhoe used in excavating the test pits, whichever occurs first. 3. Based on the soil data obtained from the test pits, perform evaluations of onsite stormwater disposal feasibility and slope stability, and provide recommendations for grading, slope stabilization, erosion mitigation, drainage control and foundation support to the two new residences. 4. Prepare a written report to present our findings, conclusions and recommendations. SITE CONDITIONS SURFACE CONDITIONS The subject reside nce lots are located on the southeast side of 96 th Place West. They are situated on the top of a moderate to steep, southerly to southwesterly -declining hillside. The terrain within the lots generally slopes down gently to moderately southeasterly for about their northern to northwestern halves, then descend steeply from there to their southeast boundaries. The gently sloped north to. northwestern portions of the lots is covered.with lawn grass, while the remaining areas of the lots are covered by thick Scottish Broom and berry bushes. LIU & ASSOCIATES, INC. March 17, 2011 Three Single -Family Residences L&A Job No. 11-012 Page 3 GEOLOGIC SETTING The Geologic Mgp of the Edmonds East and Part of Edmonds West Quadrangles, Washington, by James P. Minard, published by U. S. Geological Survey in 1983, was referenced for the geologic and soil conditions at the site. According to this publication, the surficial soil units at and in the vicinity of the subject site are mapped as Vashon Till (Qvt) underlain by Advance Outwash (Qva). The Vashon till soil unit covers the upper portion while the advance outwash soil unit covers lower portion of the hillside. The geology of the Pu . get Sound Lowland has been modified by the advance and retreat of several glaciers in the past and subsequent deposits and erosion. The latest glacier advanced to the Puget Sound Lowland is referred to as the Vashon Stade of the Fraser Glaciation, which has occurred during the later stages of the Ple istocene Epoch and retreated from the region some 14,500 years ago. The Vashon till soil unit was plowed under glacial ice during the most recent glacial period as it advanced over an eroded, irregular surface of older formations and sediments. The till soil over the top two to four feet is normally weathered to a medium -dense state, and is moderately permeable and compressible. The underlying fresh till -soil, over -consolidated by 3,000 to 5,000 feet of ice, is a very -dense mixture of unsorted clay, silt, sand, gravel, and scattered cobbles and boulders, often referred to by laymen as "hard pan". The fresh till soils are practically impervious. They have a shear strength comparable to that of low-grade concrete, and can stand in steep natural or cut slopes and remain stable for a long period. If remained undisturbed and well -drained, the fresh till soils can provide excellent foundation support with little settlement expected. LIU & ASSOCIATES, INC. March 17, 2011 Three Single -Family Residences L&A Job No. 11 -0 12 Page 4 The advance outwash soil unit, normally underlying a Vashon till soil unit, is composed of stratified sandand gravel with very minor amount of silt and clay, deposited by the meltwater of advancing glacial ice of the last glacier. The advance outwash deposits had been glacially overridden and are generally dense to very dense in their natural, undisturbed state, except the soil exposed in the top 2 to 3 feet which is normally weathered to a medium -dense state. Due to their generally granular composition, the advance outwash deposits are of moderately high permeability and drains fairly well. SOIL CONDITION The subsurface conditions of the lots and an adjacent private drainage easement were explored with five test pits. These test pits were excavated on February 17 and March 4. 2011, with a track -mounted backhoe to depths from 6.5 to 12.5 feet. The approximate locations of the test pits are shown on Plate 2 - Site and Exploration Location Plan. The test pits were located with visual reference to existing topographic features in the field and on the topographic survey map, and their locations should be considered only as accurate to the measuring method used. A geotechnical engineer from our office was present during subsurface exploration, who examined the soil and geologic conditions encountered and completed logs of test pits. Soil samples obtained from each soil unit in the test pits were visually classified in general accordance with United Soil Classification System, a copy of which is presented on Plate 3. Detailed descriptions of soils encountered by test pit are presented in the soil logs on Plates 4 through 6. The . two test pits, Test ocated in the upper portions (f :Lo:ts7 :and:8 :encLintered a fresh till deposit of light -gray, very -dense, weakly -cemented, gravelly, silty, fine sand with LIU & ASSOCIATES, INC. March 17,2011 Three Single -Family Residences L&A Job No. 11-012 Page 5 occasional cobble, from about 2.5 to 3.2 feet below ground surface to the depths explored. This till deposit is overlain by layers of fill and weathered till soil. Test PiC a�nd) located north of a buried stormwater detention vault in the private drainage easement abutting the east side(o:f:L�ot �8,countered 6.1 and 3.3 feet of fill, respectively. Th I e fill appears to be spoil soil from lot grading or from excavation of the vault pit and was disposed onsite. It appears to have been compacted to some degree, but the fill in Test Pit 3 still experienced some sloughing. A thin layer of relic topsoil was found underlying the fill in Test Pit 3. QTestPit , located near th(Zeas . :tboundary of the easemen �,encountered a layer of topsoil, f but no fill. riderlying the fill and topsoil in these test pits are layers of weathered till and fresh till soil to depths from 5.0 to 8.0 feet. A fresh advance outwash deposit of gray, dense, medium sand with various amount of -gravel, was found underlying the fresh till layer in these three test pits. GROUNDWATER CONDITION Groundwater was not encountered by any of the five test pits excavated on the site. The fresh till deposit underlying the site at shallow depth is of extremely low permeability and may perch stonnwater infiltrating into the more permeable surficial soils. The amount of and the depth to this near -surface, perched groundwater would fluctuate seasonally, depending on precipitation, surface runoff, ground vegetation cover, site utilization, and other factors. This near -surface perched groundwater may dry up completely during the dryer Summer and Fall seasons and accumulate and rise in the wet Winter season. The test pits were excavated in the middle of Winter and the subject site is located on the top of a hillside, therefore, we anticipate only limited amount, if any at all, of groundwater under the site even in the winter months. Consequently, the impact of groundwater on the proposed development, in our opinion, should be minimal. LIU & ASSOCIATES, INC. March 17, 2011 Three Single -Family Residences L&A Job No. 11-012 Page 6 DISCUSSION AND RECOMMENDATIONS GENERAL Based on the geologic condition indicated on the above -referenced geologic map and the soil condition encountered by test pits excavated on the site, it is our opinion that the subject lots are suitable for the development of the three proposed residences. The fresh till deposit at shallow depth underlying the upper portion of the lots should be able to provide excellent foundation support to the proposed residences. This deposit.is also of'extremely low permeability and will not work well for infiltration facilities. How ever, the advance outwash sand soil encountered in Test Pits 3 through 5 located at the downhill area in the private drainage easement is of moderately high permeability and should be able to support infiltration facilities for stormwater disposal of the residences to be constructed on Lots 7 and 8. GEOLOGIC HAZARDS AND REMEDIATION Landslide Hazard The site is underlain at shallow depth by very -dense fresh till soil of high shear strength, with a high resistance against slope failure. The fresh till soil is also exposed on a vertical cut bank in the middle part of the hillside that can be seen from the gravel -surfaced yard next to a gas station on Edmonds Way. This vertical cut bank in fresh till soil has remained stable for many years. Therefore, it is our opinion that the potential for deep-seated landslides to occur on the subject lots should be minimal, provided the recommendations in this report are fully implemented and complied with during construction. Erosion Hazard The fill, topsoil and the medium -dense weathered soils mantling the site are of low to moderate resistance against erosion, while the underlying fresh till and 'advance out deposit deposits are of LIU & ASSOCIATES, INC. March 17,2011 Three Single -Family Residences L&A Job No. 11-012 Page 7 high to moderately -high resistance against erosion. There is an outside chance that erosion may occur in the weaker surficial soils over the steep slopes of the lots if they are devoid of vegetation cover and overly saturated. Progressive erosion can lead to shallow, skin -type mudflows on the steep slopes of these lots. To mitigate such erosion hazard, vegetation outside of construction limits should be preserved and maintained. Unpaved ex p*osed finished ground within the site resulted from construction activities should be re -seeded and re -vegetated as soon as possible. Concentrated stormwater should not be discharged uncontrolled onto the ground within or adjacent to the lots. Stormwater over impervious surfaces, such as roofs and paved driveways, should be captured by underground drain line systems connected to roof downspouts or by catch basins installed in paved driveways. Water collected by these drain line systems should be tightlined to discharge into a storm sewer or a suitable' stormwater disposal facility system, such as infiltration trenches. Seismic Hazard The Puget Sound region is in an active seismic zone. The site is underlain at shallow depth by dense to very -dense fresh till and advance outwash deposits of high to very -high shear strength. Therefore, it is our opinion that the potential for seismic hazards, such as landslides, liquefaction, lateral soil spreading, to occur on the site should be minimal if the erosion mitigation, drainage control, site stabilization measures recommended in this report are fully implemented. The proposed residences, however, should be designed for seismic forces induced by strong earthquakes. Based on the soil conditions encountered by the test pits, it is our opinion that Seismic Use Group I and Site Class C should be used in the seismic design of the proposed r6sidences in accordance with the 2006 International Building Code (IBC). TEMPORARY DRAINAGE AND EROSION CONTROL LIU & ASSOCIATES, INC. March 17, 2011 Three Single -Family Residences L&A Job NoA 1-0 12 Page 8 The onsite surficial soils contain a high percentage of fines which are sensitive to moisture and can be easily disturbed by construction traffic. A sufficiently thick layer of clean, 2-to-4-inch quarry spalls should be placed over areas of frequent traffic, such as the entrance to the site, as required, to protect the subgrade soils from disturbance by construction traffic. A silt fence should be installed along the downhill boundaries of the site to minimize transport of sediment onto neighboring properties or the streets. The bottom of the filter cloth of. the silt fences should be anchored in a trench filled with onsite soils. Ditches or interceptor trench drains should be installed on the uphill sides of construction areas, as required, to intercept and drain away storm runoff and near* -surface groundwater seepage, if any. Water captured by such ditches or interceptor trench drains should be discharged. into a nearby storm inlet. The storm inlet should be covered with a filter sock to prevent sediment from entering the storm sewer system. The filter sock should be cleaned frequently during construction to prevent clogging, and should be removed after completion of construction. Spoil soil should be hauled off of the site as soon as possible. Spoil soil and imported structural fill material to be stored on site should be located in areas where the ground surface is no steeper than 15% grade, and should be covered with plastic tarps securely weighted down with sandbags. EXCAVATION AND FILL SLOPES Under no circumstances should excavation slopes be greater than the limits specified by local, state and federal safety regulations if workers have to perform construction work in excavated areas. Unsupported temporary cuts greater than 4 feet in height should be no steeper than 3/4H: IV in the fill, topsoil and weathered till soil, and may be vertical in the underlying fresh till LIU & ASSOCIATES, INC. March 17, 2011 Three Single -Family Residences L&A Job No. 11 -0 12 Page 9 and advance outwash deposits provided that the overall depth of excavation does not exceed 12 feet. Unsupported permanent cut banks should be no steeper than 2-1/4H: IV in the fill, topsoil, no steeper than 2H: I V in the weathered till soil, and no steeper than I- 1/2H: 1 V in the underlying fresh till and advance outwash deposits. Permanent, fill embankments required to support structural or traffic load should be constructed with compacted structural fill placed over undisturbed, proof -rolled, firm, native, fresh till soil after the surficial unsuitable soils are completely stripped. The slope of permanent fill embankments should be no steeper than 2-1/411: IV. Upon completion, the sloping face of permanent fill embankments should be thoroughly compacted to a non -yielding state with a hoe - pack. The soil units and stability of cut banks should be verified by a geotechnical engineer during excavation. The above recommended cut and fill slopes are under the assumption that groundwater seepage would not be encountered during construction. If groundwater seepage is encountered, the construction should. be immediately halted and the slope stability re-evaluated. The slopes may have to be flattened and other measures taken to stabilize the slopes. Surface runoff should not be allowed to flow uncontrolled over the top of cut or fill slopes. Permanent cut slopes or fill embankments should be vegetated as soon as possible for long-term stability, and should be covered with clear plastic sheets, as required, to protect them from erosion until the vegetation is fully established. STRUCTURAL FILL LIU & ASSOCIATES, INC. March 17, 2011 Three Single-Farnily Residences L&A Job No. 11-012 Page 10 Structural fill is the fill that supports structural or traffic load. Structural fill, if required, should consist of clean granular soils free of organic and other deleterious substances and with particles not larger than four inches. Structural fill should have.a moisture content within one percent of its optimum moisture content at the time of placement. The optimum moisture content is the water content in the soils that enable the soils to be compacted to the highest dry density for a given compaction effort. Onsite soils meeting the above requirements may be used as structural fill. Imported materialto be used as structural fill should be clean, free -draining, granular soils containing no more than 5 percent by weight finer than the No. 200 sieve based on the fraction of the material passing No. 4 sieve, and should have individual particles not larger than three inches. The ground over which structural fill is to be placed should be prepared in accordance with recommendations in the SITE PREPARATION AND GENERAL GRADING and EXCAVATION AND FILL SLOPES sections of this report. Structural fill should be placed in lifts no more than 10 inches thick in its loose state, with each lift compacted to a minimum percentage of the maximum dry density determined by, ASTM D1557 (Modified Proctor Method) as follows: Application Within building pads and under foundations Roadway/driveway subgrade Retaining wall backfill Utility trench backfill BUILDING FOUNDATIONS % of Maximum Dry Densily 95% 95% for top 3 feet and 90% below 92% 95% for top 4 feet and 90% below LIU & ASSOCIATES, INC. March 17, 2011 Three Single -Family Residences L&A Job No. 11-012 Page 11 Conventional footing foundations may be used to support the proposed residences. The footing foundations should be constructed at least 6 inches into the underlying, yery-dense, fresh till soils. Water should not be allowed to accumulate in excavated footing trenches. Disturbed soils in footing trenches should be completely removed down to undisturbed, native, fresh till soils prior to pouring concrete for the footings. If the above recommendations are followed, our recommended design criteria for footing foundations are as follows: 0 The -allowable soil bearing pressure for design of footing foundations, including dead and live loads, should be no more than 3,000 psf if constructed into very -dense, weakly - cemented, fresh till soils. The footing bearing soil should be verified onsite by a geotechnical engineer after the footing trenches are excavated and before the footings poured. • The minimum depth to bottom of perimeter footings below adjacent final exterior grade should be no less than 18 inches. The minimum depth to bottom of the interior footings below top of floor slab should be no less than 12 inches. • The minimum width should be no less than 16 inches for continuous footings, and no less than 24 inches for individual footings, except those footings supporting light -weight decks or porches. A one-third increase in the above recommended allowable soil bearing pressure may be used when considering short-term, transitory, wind or seismic loads. For footing foundations designed and constructed per recommendations above, we estimate that the maximum total post - construction settlement of the buildings should be 1/2 inch or less and the differential settlement across building width should be 3/8 inch or less. LIU & ASSOCIATES, INC. March 17, 2011 Three Single -Family Residences L&A Job No. 11 -0 12 Page 12 Lateral loads on the proposed residences may be resisted by the friction force between the foundations and the subgrade soils or the passive earth pressure acting on the below -grade portion of the foundations. For the latter, the foundations must be poured "neat" against undisturbed soils or backfilled with a clean, free -draining, compacted structural fill. We recommend that an equivalent fluid density (EFD) of 350 pcf (pounds per cubic foot) for the passive earth pressure be used for lateral resistance. The above passive pressure assumes that the backfill is level or inclines upward away from the foundations for a horizontal distance at least 1.5 times the depth of the foundations below the final grade. A coefficient of friction of 0.55 between the foundations and the subgrade soils may be used. The above recommended soil parameters are unfactored values, and a proper factor of safety should be used in calculating the resisting forces against lateral loads on the proposed residence. ONSITE STORMWATER DISPOSAL Feasibility Three soil samples were selected for Particle Size Distribution tests in laboratory to determine feasibility of using infiltration trenches to dispose stormwater onsite for the residences to be constructed on Lots 7 and 8. These soil samples were obtained from the advance outwash deposit in test pits excavated at the lower portion of the hillside within the private drainage easement abutting the east side of Lot 8. Soil Sample I was taken from Test Pit 3 at 8.5 feet deep, Soil Sample 2 from Test Pit 4 at 8.5 feet deep, and Soil Sample 3 from Test Pit 5 at 6.0 feet deep. The reports of these tests are presented in APPENDIX — Laboratory Tests, attached hereto. As shown on the Particle Size Distribution reports, Soil Samples I through 3 were all composed of gravelly fine to coarse sand, with a clay content of 3.4%, 3.0% and 3.5%, and gravel/sand LIU & ASSOCIATES, INC. March 17, 2011 Three Single -Family Residences L&A Job No. I 1 -0 12 Page 13 content of 82.1%; 82.8%, and 81.9%, respectively. According to the USDA Texture Triangle (from U.S. Department of Agriculture), shown under Appendix, all three soil samples can be classified as sand -dominated Loamy Sand. This type of soil should be able to support infiltration trenches for onsite stormwater disposal. Design Inffitration Rate According to Table 3.7 of the Stormwater Management Manual for Western Washington, 2005 by Washington State Department of Ecology, the estimated long-term (design) infiltration rate is 0. 5 iph (inch per hour) based on a correction factor of 4 on a short-term infiltration fate of 2 iph for loamy sand, and is 2.0 iph based on a correction factor of 4 on a short-term infiltration rate of 8 iph.for sand. Since the loamy sand of the advance outwash deposit is sand -dominated, we recommend a design infiltration rate of 0.75 iph be used for the design of infiltration trenches to be used for onsite dispose of stormwater for theresidences to be constructed on Lots 7 and 8. Construction Recommendations Infiltration trenches extending to at least 6 inches into the underlying advance outwash sand deposits at the lower portion of the hillside within the private drainage easement may be used to dispose stormwater for the residences to be constructed on Lots 7 and 8. To -reach this target soil layer the infiltration trenches would have to be excavated from approximately 5.5 to 8.5 feet deep. The soil unit at bottom of infiltration trenches should be verified by a geotechnical engineer. The infiltration trenches should be set back at least 5 feet from property lines and at least 8 feet from nearby house foundations. Cut banks of the trenches should be set back at least 2 feet from the nearby existing rockery, and should be sloped back no steeper than 3/4H: IV in fill, topsoil or weathered soil and may be vertical in the underlying fresh till and advance outwash deposit. The LIU & ASSOCIATES, INC. i March 17, 2011 Three Single -Family Residences L&A Job No. I 1 -0 12 Page 14 soil units and stability of trench cut banks should be verified by a geotechnical engineer during excavation. The schematic presentation, of an infiltration trench with a single dispersion pipe is shown on Plate 7. The infiltration trench should be at least 24 inches wide. The schematic presentation of an infiltration trench with multiple dispersion pipes is shown on Plate 8. Multiple dispersion pipes, if used in an infiltration trench, should be placed at least 2 feet off the trench walls and spaced at no closer than 4 feet on centers. The side walls of the trenches should be lined with a layer of non -woven filter fabric, such as MIRAFI 140NS. The trenches are then filled with clean washed 3/4 to 1-1/2 inch gravel or crushed rock to within about 8 inches of the finish grade. The dispersion pipes should be constructed of 4-inch rigid PVC pipes and laid level in the gravel or crushed rock filled trenches at about 10 inches below the top of trenches. The top of the gravel or crushed rock fill should also be covered with the filter fabric liner. The remaining trenches should then be backfilled with compacted onsite clean soils. Stormwater captured over paved driveways should be routed into a sediment control structure/oil-w.ater separator catch basin before being released into the infiltration trenches. DRAINAGE CONTROL Building Footprint Excavation Building footprint excavation for the proposed residences, if encountering groundwater seepage, should have bottom of excavation sloped and ditches excavated along the bases of cut banks to direct collected groundwater into sump pits from which water can be pumped out. A layer of 2- inch crushed rock should be placed over footing bearing subgrade soils, as required, to protect the soils from disturbance by construction traffic. This crushed rock base should be built to a LIU & ASSOCIATES, INC. a March 17, 2011 Three Single -Family Residences L&A Job No. 11 -0 12 Page 15 few inches above groundwater level, but not less than 6 inches thick. The crush rock base should be compacted in 12-inch lifts to a non -yielding state with a vibratory mechanical compactor. Runoff Over Impervious Surfaces Storm runoff over impervious surfaces, such as roofs and paved driveways, should be collected by underground drain line systems connected to downspouts and by catch basins installed in paved driveways. Stormwater thus collected should be tightlined to discharge into a nearby storm sewer or a suitable stormwater disposal facility system, such as infiltration trenches. Building Footing Drains A subdrain system should be installed, around the perimeter footings of each of the proposed residences. The subdrains should consist of a.4-inch-minimum-diameter, perforated, rigid, drain pipes, laid a few inches below bottom of the perimeter footings of the buildings. The trenches' and the drain lines should have a sufficient gradient (0.5% minimum) to generate flow by gravity. The drain lines should be wrapped in non -woven filter fabric socks and completely enclosed in clean 3/4 to - 1- 1/2 inch washed gravel or crushed rock. The remaining trenches may be backfilled with clean onsite soils. Water collected by the perimeter footing subdrain systems should be tightlined, separately from the roof and surface stormwater drain lines, to discharge into a storm sewer or a suitable stormwater disposal facility, such as rain gardens. Surface Drainage Water should not be allowed to stand in any areas where footings, on -grade -slabs, or pavement is to be constructed. Finish ground surfaces should be graded to direct surface runoff away from the proposed residences. We recommend the finished ground be sloped at a gradient of 3. percent LIU & ASSOCIATES, INC. March 17, 2011 Three Single -Family Residences L&A Job No. 11-012 Page 16 minimum for a distance of at least 10 feet dway from the buildings, except in the areas to be paved. Cleanouts Sufficient number of cleanouts at strategic locations should be provided for underground drain lines. The underground drain lin es should be cleaned and maintained periodically to prevent clogging. RISK EVALUATION STATEMENT The subject site is underlain at shallow depth by very -dense, weakly -cemented, fresh till and advance outwash soils. These basal soils are of high shear strength and the site should be quite stable. Proper and adequate erosion mitigation and surface and groundwater drainage control are key to maintain site stability during and after completion of construction. It is our opinion that if the recommendations in this report are fully implemented and observed during construction and following the completion of construction, the areas disturbed by construction will be stabilized and will remain stable, and will not increase the potential for soil movement. In our opinion, the risk for damages to the proposed development and from the development to adjacent properties from soil instability should be minimal. LIMITATIONS This report has been prepared for the specific application to this project for the exclusive use by Murphy Building Company and their representatives, associates, consultants and contractors. We recommend that this report, in its entirety, be included in the project contract documents for LIU & ASSOCIATES, INC. March 17, 2011 Three Single -Family Residences L&A Job No. 11-012 Page 17 the information of the prospective contractors for their estimating and bidding purposes and for compliance with the recommendations in this report during construction. The conclusions and interpretations in this report, however, should not be construed as a warranty of the subsurface conditions. The scope of this study does not include services related to construction safety precautions and our recommendations are not intended to direct the contractor's methods, techniques, sequences or procedures, except as specifically described in. this report for design considerations. Our recommendations and conclusions are based on the geologic and soil conditions encountered in the test pits, and our experience and engineering judgment. The conclusions and recommendations are professional opinions derived in a manner consistent with the level of care and skill ordinarily exercised by other members of the profession currently practicing under similar conditions in this area. No warranty, expressed or implied, is made. The actual subsurface conditions of the site may vary from those encountered by the test pits. The nature and extent of such variations may not become evident until construction starts. If variations appear then, we should be retained to re-evaluate the recommendations of this report, and to verify or modify them in writing prior to proceeding further with the construction of the proposed development. CLOSURE We are pleased to be of service to you on this project. Please feel free to contact us if you have any questions regarding this report or need further consultation. LIU & ASSOCIATES, INC. March 17, 2011 Three Single -Family Residences L&A Job No. I 1 -0 12 Page 18 Eight plates attached Yours very truly, LIU & ASSOCIATES, INC. J. S. (Julian) Liu, Ph.D., P.E. Consulting Geotechnical Engineer LIU & ASSOCIATES, INC. March IT 2011 'I'liree Siji-lc-Familv Residences r, - L&A. Jot) No. I I -M . I CLOSUIRE. - We are pleased to be of ser\ ice to N-OU *on this projject. Piet -se feet free to contact us OU have XIV questions regarding this report or need Wrther consultation. Eight plates atlkbed YOUrs very truly. W I - I I LI A), A QQ I W-I A Tl�'Q. I - Tr- ....... Nl- Effl. Ph.D.. P.F- LIU & ASSOCIATES, INC. SEACH i�':S S ST '2 FW '7i c s PRAGU E s' E3. m TA YFI �Ej ST 5ELL -1 � Q ni C PL sw T� IN S-T L I coi DAYTONI i i n� ST 5" "P� C 3J2O9T1'1+: f �:p L MAPLEt 2 --------- i-- ST Sw 'S T Rk �_' _A.' . I ST ALDERi 2 <'ALNP C) UNION 3t-0 I WXLY rjR I 1,ic F\S OIL rz rEDAR 5_1 j L HOWELL WY ? UICE �14RSH S - , 'r', Co; . I rR <' ;P . E2'm u, 21 "r L_ o' 71: . ..' - . LI-411, CD ML-MLOCV. Z y 2 Sid 215TH S, ?15TH 5 LAUREL ?L 215T"A av SW LU IN -1 1 '7 :> Si 2- 6 <1 FoRs T'H MAKAH af . '- 1R.-_ -'- I �E- 'a-1 217TH ST LN 2!71H PL Sd FIR ST PL FIR PL 6811f. _—Z SW �Lj Lj_j 0 F j" ry- 30 F < NZ:1- - - z L& 1 COO LA LM T'H"!;" sw RD E ST 220 Cr� ST _21H �L NITCOMB cli? 71V E ZZ, T L BIRCH '221f' ­j�� sw PL DO G A- Z 9� -of sw im ST SN 224TH KULSHAN 14TH ;�w ZK 3�; 14 :Bt PL W 4'.__ Te� GONOUIN ST S� A'H 'T 226T� sw I LN 22M PROJECT %"30 TH , ri", = I C2 i M� - s 227TH PL ;w 227T)i PL g27 c A 228TH S;�;.' RIAL c" 228TH SITE y CEP TER nQ 228TH jfK SW. ') .�l s-f TH p < 3! 4 'E 7 V. !Z; F' IT 'Iel 232ND ;--I= 231 ST FS sw I T W HOLLY LN 232140 ST s (232ND PL SW) COL- Mpm sf 91 233RD RA LE EWNDS- L LN MMAY -L" PL SW it (233RD PL Sw) 234TH MADPONA C14 HS ST'� ?34TH �F` Y2 s n' Qc� - w 47 97C (23.111 Pt sw� 23" INGRAM RD s PL < 3: ST SW 235TH PL SW Z XTH S Aw j FUrIL 2361q PL S ROBBERS ROOST. - cz�) '-/ =j PL j r136 7,' ;W 6 u �2.37TH 238TH ST =ISW Z' 23 TH ST SW ;W1 - 4 1 Z' Y, =1� i T C5 2361H I f. U U_T 1 UN U 'it .11 239 ;;, 240TH NEMOi IA jvq�� giZ L PL qCENTER AV);4151 Y_1! sw �11 Al F_ I 11 OlU L EA LE L -1- __ 6T y L �315L Sw f1l 4N 242ND ST sw t L sw 'SNOHOKII&S AN) ai i -F' 8 iRRY LN 2431,1_-on_� P 4 R;, PL VICINITY MAP Ll U & ASSOCLILTES, INC. THREE SINGLE-FAMILY RESIDENCES 228XX - 96TH PLACE WEST Geotechnical Engineering E_:nqineenng Geology S6ence EDMONDS, WASHINGTON JOB NO. 11-012_ 1 DATE 2/15/2011 1 PLATE c) (D 0 rD 0 0 0 L �-3 (N ID CURRfxl Ks-muLT 2 CLWFO.M 3 SET A CEmlEA a- CLUESAC PER PRE -DM (PwENT PLAT FWCMEERING CONTOURS m ","R, 96th PL. W. EDMONDS '0 DR'AICNAYWEASEMEN I r-) SEE I)ElAIL ON 0 SHFET 4 OF 4 (D t:3 0. —1 0 OPE 0 40 - ----- 50'- OV4. -7 --PRIYAT DR, (; Tri R T m I a) LOIS 1 -B.-Eh- 31P3 LIU co eoftN -�771� (D t -:2 a L�j c a. Y.- CARAGF. IV V 0 cl) -T q) SF cf) S�l. 00 7. x DOI -N 0 X Z Z E OLYMPIC '4EW WATER AND SEWER DISTRICT SANITARY SEWER M M EASEMENT-SrE DETAIL 0 ON SHEET 4 OF 4 -n SIC-' > > 0 1 ,002.. SF M co > r- T- n 35' 0 m UTILITY cf) �7 M r- EA— > SEMENT ql- m co \A UNIFIED SOIL CLASSIFICATION SYSTEM .MAJOR DIVISIONS GROUP GROUP NAME SYMBOL GRAVEL C L E N G'A/ COARSE- "4 GR �J'El GRAVEL WITH GM k G 3RAINED �Ot-,F.SE GC SOILS p E: 1 z�. i N, E C, FINES ja'� Ev S R:.t j z SAND CLEAN SW MORE 'HAN, 1101-k, tooRE: TiAN 50'�, �DF SAND IS p P l'� P L R -' D r' S."'lNID WITH SM 7)' PETAIHED) )[,j 7HE r-OA.Rc ��F -;R;%C7 'D!'� SC "SY S C NO -X SiEVE FINES FINE- SILT AND CLI^"kY INORGANIC ML S11-7 CL CLAY GRAINED LIOUID LIM5T ORGANIC OL 'zl,-.T. OR-GANIC CLA-Y SOILS LESS THAN 50% MOR E TH AN 50% SILTY AND CLAY INORGANIC MH D: HIGH PLASTICITY E�ASTI-- S-LT CH I T �-I.A i PASSING ON THE LIC-JOD D10:T I ORGANIC OH o R G A IN C S, L T. 0 :1 G t"�"j I C S � L T N'0-200 SIEVE 50�1/r2 OR MORE I HIGHLY ORGANIC SOILS PT Pm- A T AND C-TH ER L T r'.R N IC SCL-Lz NOTES: SOIL MOISTURE MODIFIERS: FIELD CLASSIFJCA,710�j IS BASE[) ',:j DRY - -�:F DRl' TO OF S01 :N GENERAL AXORr.�ANCE AS. D- THE T'--�UCH 2 SOIL 'CLASSIFlCATION USING LABORATORY TESTS IS BASED SLIGHTL �' k1C IS7 MCi�ST� jR7- '.-)---T D jS ON AST M D24-67-83 IA 0 1 S T - DA 11M P, P- U NO VI S: 6 L E E R 3. DESCRIPTIONS OF SOIL DENSITY OR CONSIS7ENCY ARE VERY MOiST- VERY DAMP. tAOISTURE FELT THE 7�:,UCH, BASED OWNTERPRETATION OF BL0VV-COU,'-jT DATA, VISUAL VVET - VIS!BLE FREE �AJATEP OR SATURATED,* APPEA.RkNCE OF SCILS. AND;OR TEST CATA S L y S,--; 1 L S 0 3 A I E D F R C., r,1 e E L C V v V/ATER TABLE 1,11) & ASSOCtATES, INC. UNIFIED SOIL CLASSIFICATION SYSTEM Geo',F- clinical E�jgmeerinq - Engineering Geblogy Earth Science LPLATE 3 p Loaaed Bv: JSL TEST PIT NO. Date: 2/17/2011 ii Ground El. Depth ft. USCS CLAS& Soil Description Sample No. W % Other Test Sm Scottish broom and berry bush on surface 1 Brown to gray, medium -dense, silty fine SAND. some gravel, with fine roots. moist (FILL) 2 - - - - - - - - - - - - - - - - - - - - - - - - - — - - - - - - -- Sm - - - - - - - - - - Light -brown, medium -dense. silty fine SAND. trace gravel. moist (weathered VASHON TILL) 4 ------------------------------------------ Sm Light -gray, very -dense, gravelly, silty, fine SAND. occasional cobble, weakly -cemented, r-noist fresh VASHON TILL) 6 7 8 10 12 13 47TTest pit terminated at 12.5 ft: groundwate.r not encountered. TEST PIT NO. 2 L000ed Bv: JSL Date: 2/17/2011 Ground El. Depth ft. USCS CLASS. Soil Description Sample No. W % Other Test Sm Lawn grass on surface 1 Brown to gray, mediu.m-dense. silty fine SAND, trace gravel, ___p . !(Lc(Lof cloth, moist (FILQ - - - - - - - - - - - - - - - 2 Sj� Brown, me&7�Trri-Cense, silty fine SAND, trace gravel, moist - - - - - - - - -- (wutheiecLYASR0NJLLU - - - - - - - - - - - - - - - - - - - 3 SM Light -gray. very -dense, gravelly, silty. fine SAND, occasional cobble, weakly -cemented. moist (fresh VASHON TILL) 4 5 7 Test pit terminated at 6.0 ft; groundwater not encountered, 8 LIU & ASSOCIATES, INC. Geotechnical Engineering Engineering Geology Earth Science , TEST PIT LOGS THREE SINGLE-FAMILY RESIDENCES 228XX - 96TH PLACE WEST EDMONDS, WASHINGTON JOB NO. 11-012 1 DATE 3/412011 1 PLATE 4 Logged By: JSL TEST PIT NO. Date: 3/4/2011 3 Ground El - Depth ft. LISCS CLASS. Soil Description Sample No. w % Other Tesi SIM Scottish broom and berry bush on surface Brown to gray, loose to medium -dense, slightly silty, fine to medium SAND, trace to some gravel, moist (FILL) 2 Note-, Fill on trench wall partially collapsed. 4 6 ------------------------------------------ 7 SP/SM Brown. medium -dense, slightly silty, fine SAND, some gravelly, moist 8 s�5 _dra_y_,d_en_s_e, medij�A�15, Trace to some gravelly, moist (fresh ADVANCE OUTWASH) 10 111 1 Test pit terminated at 10.0 ft: groundwater not encountered. TEST PIT NO. 4 Logged By: JSL Date'. 3/4/2011 Ground El. Depth ft.* USCS CLASS. Soil Description Sample No. W % Other Test Sm Scottish broom and berry bush on surface Light -brown to light -gray, niedium-dense, gravelly, silty, fine SAND, trace gravel, rnoist (FILL) 2 4 ------------------------------------------- OL Dark -brown, loose. organic, silty fine SAND, moist L�emnant TOPSOIL) . . . . . . . . . . . . . . . . . Brown, r;�dium-dense. silty fine SAND, trace gravel. moist (weathered VASHON TILL) ------------------------------------------ Sm Light -brown to light -gray, very -dense, gravelly, silly, fine SAND, 7 weakly -cemented, moist (fresh VASHON TILL) 8 ------------------------------------------ Gray. dense. gravelly. rnediurn SAND, moist 9 (fresh ADVANCE OUTWASH) 10 11 Test pit terminated at 10.0 ft; groundwater not encountered. 12 LIU & ASSOCIATES, INC. Geotechnical Engineering Engineering Geology Earth Science TEST PIT LOGS THREE SINGLE-FAMILY RESIDENCES 228XX - 96TH PLACE WEST EDMONDS, WASHINGTON JOB NO DATE 3/4/2011 1 PLATE 5 or or" C- 0 m z 0 -4 > m I n I ri 0 z Cf) In z m < T m i�j! C) m co -0 z rn m rn fj) r T . I . . . I . I , . Ell -jj L=! - (2,o - I - - 0. - -6 t, ?, � o L) -M !�r_ D I m P-t� T 60� TRO L� P" r I r a C. F-6 C C, V k.) /-\f 6,'0 r- u t� Fe�PF-. ..'D 00 ILI -- (i HT L, F,� 0 v 0 0 coo 04 0 6oT-ro m /-Fp" F- �j c M (tJ t4 -ro c L C-- A t� P i C-S 41 ti Logged By: JSL TEST PIT NO. Date'. 3/4/2011 5 Ground El. t Depth ft USCS CLASS. Soil Description Sample No. W r/:; Other Test Sm Scottish broom and berry bush on surface 1 Dark -brown, loose, organic, silty fine SAND, fine roots.. moist Sm \(TOPSOIL) 2 Brown, medium -dense. silty fine SAND. sorne gravel, moist (weathered VASHON TILL) 3 4 ----------------------------------------- SM Light -gray, very -dense, gravelly, silty, fine SAND, weakly - cemented, moist (fresh VASHON TILL) 5 - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - — - - - SP Gray.. dense. medium SAND. some gravel, moist 6 (fresh ADVANCE OUTWASH) 7 9 Test pit terminated at 8.0 ft,- groundwater not encountered. 10 Logged By: TEST PIT NO. Date: Ground El. Depth ft. USCS CLASS. Soil Description Sample No. W % ther Test 2 3 4 6 7 8 9 10 LIU & ASSOCIATES. INC. C,Poterhnical Engineering Engineering Geology Earth Science TEST PIT LOGS THREE SINGLE-FAMILY RESIDENCES 228XX - 96TH PLACE WEST EDMONDS, WASHINGTON JOB NO. 11-012 1 DATE 3/4/2011 1 PLATE 6 or, 5; C- 0 U3 z 0 T- > m 0 C� I T" Z 00 C, x Cl) ri T m > r- > Z < U) 0 M 7 1 Fi U 77 rn Fri CD I 10 0-0 0 o') 'i o 06-1 J,) 40 .0 0'0�1 4� 0 f S Q6 0") Pvc pire, 0 L) 0 eo 0 L) 0 0 6 0 o.o- 0- k IF U L:— I D NI F I (- -a" '> :3 1 0 �,:Vj H o u 5 C:E- T �OWCKP L/ C-- vvrc H 44, (Ket\lF, r- V(:, T 16 H -r I- 10 C-- W/,\y 040!) 11 it C, L-et\t� 7-14 - I V� 1� RAV C-�L- OR ' P,'L) SH C-P 6?,o c-K F- i L L- 's,/-\0 o I L-,� APPENDIX RESULTS OF LABORA]'-ORY -1"FSTS TURFE. SINGLE-FAMILY RESIDENCES 228XX - 96 PLACE WEST EDMONDS, WASHINGTON LIU & ASSOCIATES, INC. 90 8C 70 cc LU 60 Z Z 50 UJI Q Q� LLJ 40 0- 30 20 10 -201-L 1- ASTM C117/136 Particle Size Distribution Report Z" Z H 71 -T- -7 T-- t 4 500 100 10 1 0.1 GRAIN SIZE - nim 1 : , 7-7­7 0.001 % COBBLES % GRAVEL % SAND % FINES 1- SILT CLAY CRS. FINE CRS. MEDIUM -FINE i - - 0.0 27.4 1 12.8 5.9 11.8 24.) 14.5 3A SIEVE SIZE PERCENT FINER SPEC PERCENT PASS? (X=NO) 2 in. 100.0 1-1,'2 in. 82.1 I ill. 78.2 3/4 it). 72.6 5,18 in. 0.4 1121 i 67. 3/8 in. 65.3 .44 59.S U110 53.9 #40 42.1 1 -4200 17.9 0.0318 111W.. 10.6 0.0205 nim. 8.8 0.0121 ami. 6.3 0.0087 mm. 5.1 0.0062 nirn. 3.9 0.0030 nim. 2.7 0. 00 13 ill in. 1.9 Soil Description T F -.3, S,ln(]V TA)arn Atterberg Limits PL= LL= Pl= Coefficients D85= 40�7 D60= 4.10 D50= D-,o= 0.17-7 -i- D10= 0.0278 D15= 0-0575 C-U= 17516 Cc= 0.23 Classification USCS= AASHTO= Remarks F.M.=1.20 - (nosp-r-ification providcJ) Sample No.: 9724 Source of Sample: Murphy 3 Sing1c 1-w2o Date: 3-16-2CI 1 Location: Elev./Depth: 8- 4. Client: Lui & A.-;so(;iate-s F�i Project: 2011 LaboratoryTesting 0=7.3-:-1; .0 Project No: 0911-28 Nick Averill 100 90 80 LU Go LL F_ Z 50 Uj C) 0� W 40 30 20 10 '�O(L_ '�AMEL-e- 2- ASTM C117/136 Particle Size Distribution Report ';'T GRAIN SIZE - mm % FINES % GRAVEL % SAND % COBBLES CRS. FIN 711 N E SIL CLAY E CRS. 1 WFDIL�l ___T_ . 7-- ).0 j 23.,3 lo.0 13.5�� -) 142 SIEVE SIZE PERCENT SPEC.' PASS? FINER PERCENT (X=NO) 1-1,14 in. 100.0 I in. 9�-o 3fA in. 96.9 5`8 i n . 87.0 3/8 in. 78.6 *4 67.1 #ic 56.1 =140 42.� 00 17.2 0.0331 M01. 9.2 0.0210 fill)). 8. 4 0.0124 win. b. I 0.0089 ll)M. 3.9 0.0063 mm. 3.2 0.0031 min. 2.4 0.0013 1.7 TP I Loamy Sand Soil Description Atterbera Limits PL.= LL= Pl= Coefficients D85= 14.0 D60= 2.81 D50= 0.95,S D30= 0.1 13 D15= 0.0036 D10= 0.03S5 Cu= 72.98 cc= 0.28 Classification USCS= AASHTO= Remarks F'. M. = 0. 6 3 . (Tio spcci5c�ativji prolidcd) Sample No.: 9725 Source of Sample: M, Lrpby 3 ,;illgle l7al, ON Resldeiice -11-010 Date: 3-15-2011 Location: Elev./Depth: 8.5' Client: P oj ct* Lui & Associ�-,Le% 20i C/NSCAME 7=-, I[IJG I E. 12� ProjectNo: 091.1-28 Nick Averill a: LU 4�0[L' 5�AmrL_E 5 ASTM C1 17/136 Particle Size Distribution Report A )o 30 ro a io ;o to w IT 30 P - N:. w 10 o �nn In 01 0001 GRAIN SIZE - mm % COBBLES % GRAVEL % SAND %FINES CRS. MEDIUM FINE SILT -CLAY - ----- 13.7 19-3 i 6.0 ').2-3 ilL 14.6 SIEVE !PERCENT SIZE FINER SPEC.* PASS? PERCENT (X=NO) I- H4 in. 100.0 I i 11. 0.1.3 34 in. 86.3 518 in. 84.0 L �2 in. 79.0 3/8 jil. 72.9 94 67.0 1110 61.0 #40 48.7 �K_)00 18.1 0.0126 mm. 0.1 0.0') 10 mm. 7.8 0.0 123 mm. 6.3 0.0088 IM-n. 4.8 0.06'? clun, 4.0 0.0031 rnro. 73 0.0013 null. 1.� Soil Description TP-5 Atterberg Limits PL= LL= pl= Coefficients D85= 17.2 D60= 1.71 D50= 0.469 D3o= 0.150 D15= 0.0593 D10= 0.032-1 CU = 5 3.21 3 Cr= 0.41 Classification USCS= AASHTO= Rernarks F.M. -0.74 (no.Tecification provic:W) Sample No.: 9720 Source of Sample: N.1urphy 3 Single Runily Reside-nct- - 11-010 Date: 3-15-201; 1 Location: Elev.iDepth: 6.0' FClient: Lui & A,,;:Nociate.% Project: 2011 Laboratory Tescing, C^.SfZ:Ar'3F= 7F­RT111J0 L_n,1�30F=�,^Jro =111. I J Project No: (011-18 Nick Averill Textural Triangle U.S.D.A. 100% clay so so 20 70 Cis 30 so 40 silly so A clay 10:� ft .,� � .- - - - 1� ey Clay illy �60 lay fntn Sandy lay loam TO loam Los,\// 10 an loam sit 100% sand 90 Go 70 GO 60 40 30 20 10 100% 614t i Shaded area is applicable for design of infiltration BNIPs Figure 3.27 USDA Textural Triangle Source: U.S. Department of Agriculture 3-74 Volume 1/1 — Hydrologic Analysis and Flow Control BMPs February 2005 I . . Ao/ -/ '01&4 ea 152 0 z-o F r J�.: S-,q- -S F kwg I. /PLO -Fo 4,, 1 . 4,, 1 g ,^, - .5 t 2oqS 71b' k1s' 1A 7- z 5- 's = PAY ((??/I cj� 7, Zoi L4 el, dp�o )A7 e4oves m� Toot \40- J-POL F 6L <Jk4 iz CURRENTAS-BUILT CONTOURS (TYP.) MONUMENT C41- CrT A rrk[Tr*D r1r 9om PL. W. CULDESAC PER PLAT ENGINEERING ELEV. 385.58' PRE -DEVELOPMENT CONTOURS (TYP Im SF SLOPE +4%' 41 k n P \4 Y---�- 77� 10, 5 7 ?B 8,658 VF 4P 0, LINE OF STRQqTURE K LINE OF 18" 0 G OLYMPIC VIEW KA��R I AND SEWER DISTRICT' CE 'SANITARY SEWER ESMT. FF M @ 385.00' FIR&LACe)15 z 7 winr 4' WIDE K 118 6EP ON 00 -i4i.-o 0-, z 15' UTILITY EAsEMENT 355-- % 8 16,69 SCALE: 1 " = 20' 0 10 ADDRESS TAX PARCEL NO LEGAL DESCRIP770N. S17E AREA: LOT SLOPE NORTH-SOU771 I HEIGHT r,4LCULA 20 A= 393 B= 387 C= 378 n- 701) 0WNEFYCONTF?AV EROsIOjq TOR IS RESPONSIBLE FOR CONTROL AND DRAINAGE AFF�Acvm AS wmu y cr I ws OWNER/dONTRAOT09 (S RESPONSIBLE FO'� EROSION CONTROL AND DRAINAGE q It, 154014= 385.00' AVERAGE GRADE= 385.00' ACTUAL BUILDING HEIGHT= 408.16' MAXIMUM BUILDING HEIGHT= 410.00' LOT COVERA 22806 96TH PL W. 00937900000700 SECTION 36, TOWNSHIP 27, RANGE 3 NE QUARTER K. ELSIE BLK 000 D-00 LOT 7 8,658 SQUARE FEET 385.00' - J60.00'= 25.00' 30.00 VERTICAL FEET= 26.0% SLOPE 115.00 LINEAR FEET RESIDENCE 1,512 SQUARE FEET INC. COVERED PORCHES, GARAGE TOTAL 1,51218,658= IZ46Z IMPERWOUS COVERAGE. RESIDENCE (including overhangs) DRIVEWAY 1,512 SQUARE FEET mx mmmum LOT COVERAGE 1,512 SQUARE FEET 541 SQUARE FEET WALKWAY 30 SQUARE FEET TOTAL Z083 SQUARE FEET CONTACT OLYMPIC VIEW WATER/SEWER DISTRICT NOTE 1. SEE GWINGITESC AND DINNAGE/UnL17Y PLANS FOR MORE INFORM4770N. ZkV?_0 10 -0 -7 5- -7 A?PROVED �Y PLANNING 0 __-A Zone Corner-jjFIA&.p Setbacks Re, q i r ed Actual Front Sides 771p�- Rear -3 Other H*ht I L m LINE TYPE AREA (SOFT) 1. EXEMPT CUM NO#-VOPT -n - REPLACED m 3. NEW 4. 1 TO TA L I I z 083 NW114, AE1/4, SEMON 36, T27N., ME., W.M. SNOHOAHSH COUNTY CLEARWATER DESIGNED BY. DATE. I SCALE. JOB NO.: S.ROSE 051 1,�--20 10-0525 SITE PLAN I I RES UB amp INSIONT INGININKING CO. JUL 0 5 2011 P.O. BOX - 1478 EVERFIT, WA 98206 BLJJLDING DEqARi.-ME10425) 303-9363 (425) 303-9362 FAX Cj,Ty Of OtPONDS INFO@INSIGHTENGINEERING.NEr . EX. HSE. C.O. TOP-368.2 8 FILE HSE. 7 INFILL PIT 6 -- - - - - - - - - 6 C.O. - — — — — — TOP-353.8 TOP=378.7 50, PRIVATE DRAINAGE EASEMENT TO BENEFIT 40 LOTS 1-8 I.E.-M9. f8 12.5 RET. WALL TOP (Typ.) .10 0 10 20 40 39 FLOOR AREA ±440 S.F. I 1NdH = 20 F7. Storm "As-Builts" TOE (TW.) Elise Short Plat 96th P1. W .......... 121191201f lb jcofam Aneea, an RIP/W OvERFLOw MEMO 337. 3 A c-+v&Q 0 CB ESC NOfIES (ECDC 18.30. ThE.12 ELEAENTS OF TESC BAV CONSTRUCTiONSEQUENCE AW1/49 AE1/4, SECTION 36, T27N., R.3E., W.M. A. ESC IS.* ALL ACTIVITIES NECESSITA77NG A CLEARING OR GRADING PERMIT AND ALL UTLI MARK CLEARING LIMITS. I TY ELEMENT11 UM. REQUIREMEN PROJECT 5 CONSIS77NG OF MORE THAN 500 LINEAL FEET OF TRENCH EXCAV477ON SHALL BE REQUIRED TO CONTROL LIMIT OF CONSTRUC77ON ARE CLEARLY MARKED. 1. PRIOR TO C6NSTRUC77ON ACTIVMES, THE CONTRACTOR SHALL SCHEDULE AND ATTEND PRE­CoNsTRuCI?0N CONFERENCE WITH THE SNOHOMISH COUNTY, WASHINGTON EROSION ND SEDIMENT DURING CONSTRUCTION AND TO PERMANENTLY STABILIZE EXPOSED SOIL RESULTING FROM SNOHOMISH COUNTY INSPtCTION UNIT AND EROSION CONTROL CONSTRL �3710N. PROJECTS INVOLVING A CRITICAL AREA MAY ALSO BE REQUIRED TO COMPLY WITH ANY COMBINA77ON OF ELEMENT 112 - ESTABLISH CONSTRUCTION ACCESS: SPECIALIST THE ESC MINIMUM REQUIREMENTS COMPL14NCE WILL BE DEMONSTRATED THROUGH 774E IMPLEMENTATION OF AN A STABILIZED CONSTRUCTION ENTRANCE is SHOWN. APPROW ESC PLAN. GUIDELINES FOR PREPARING ESC PLANS ARE PROVIDED IN THE MANUAL. THE PLAN MUST ADDRE$! THE FOLLOWING REQUIREMENTS. 2, FLAG CLEARING LIMITS AND INSTALL SILT FENCE AS SHOWN. ELEMENT J-3 - CONTROL FLOW RA7ES. AN INFILTRATION TRENCH IS PROPOSED. 3. INSTALL ROCK CONSTRUCTION ENTRANCE. 1. ESC UM REQUIREMENT - CONSTRUCTION ACCESS ROUTE. CONSTRUC71ON VEHICLE ACCESS SHALL BE, WHENEVER PRAAC LIMITED TO ONE ROUTE. ACCESS POINTS SHALL BE STABILIZED WITH QUARRY SPALLS OR CRUSHED ROCK ELEMENT J4 - INSTALL SEDIMENT CONTROLS. TO v E THE TRACKING OF SEDIMENT ONTO PUBLIC ROADS. IF SEDIMENT IS 4. GRADE AND $TABILIZE FOUNDATION AREAS. COVER EXPOSED SOILS TRANSPORTED ONTO A ROAD SURFACE, SILT FENCE, INLET PROTECTION, MULCH, INTERCEPTOR SWALES AND WITH MULCH,'HOG FUEL OR HYDROSEED. 'HE R THE S SHALL BE CLEANED THOROUGHLY AT 774E END OF E4CH DAY. SEDIMENT SHALL BE' REMOVED FROM ROADS SEDIMENT POND ARE PROPOSED. 5`111 ING OR SWEEPING AND BE ITMNSPORTED TO A CONTROLLED SEDIMENT DISPOSAL AREA WITHIN 24 HOURS. BY SHO ' 5. CONSTRUCT WATER AND STORM UTILITIES. INSTALL 'GAS, POWER, STREET IN SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. ELEMENT #5 - STABILIZE SOILS. TELEPHONE AND CABLE UTILITIES, AS REQUIRED. SOIL STABILIZ47ION IS ACHIEVED BY MULCHING, PLASTIC COVERING AND 2 ESC hf� MUM REQUIREMENT - STABILIZATION OF EXPOSED AREAS. ALL SOILS EXPOSED BY LAND DISTURBING ACTIMES SEEDS. ST 6. ALL DISIURBED AREAS ON AND OFF SITE SHALL BE REPLACED WITH ABILIZED BY SUIIABLE APPLICATION OF BMPS, INCLUDING, BUT NOT LIMITED TO, SOD, HYDROSEEDING, OR COMPOST AMENDED SOIL PER STORMWATER MANUAL DEFAL . 3. -OR MULCHING. ALL 8MPS SHALL BE SELECTED, DESIGNED, AND MAINTAINED IN 1 751 OTHER RON, PLASTIC. COVERING, ELEMENT 16 - PROTECT SLOPES. A I'D ACCOR NCE WITH THE MANUAL THE EXPOSED SOILS SHALL BE STABILIZED ACCORDING TO AN APPROVED TIMETABLE 5 ARE PROTECTED BY PLASTIC COVERING, MULCHING AND (TYPICAU"Y, NO SOILS SHALL REMAIN EXPOSED FOR MORE THAN TWO DAYS FROM OCTOBER 1 THROUGH APRIL 30 AND SLOPE, 7. CONSTRUCT STORM DRAINAGE SYSTEM AND REMOVED SEDIMENTA77'ON EXIS77NG VEGETATION. IN ALL CATCH BASINS AND THE VAULT. NO 7HAN SEVEN DAYS FROM MAY .1 THROUGH SEPTEMBER 30). 3. ELEMENT J7- PROTECT DRAIN INLETS: 8. STABILIZE ALL DISTURBED AREAS AND REMOVE ALL TE.S.C. MEASURES. ESC MIA (MUM REQUIREMENT - PR07ECTION OF ADJACENT PROPERTIES. ADJACENT PROPERTIES SHALL BE PR07ECTO INLET PROTECTIONS ME PROPOSED FOR THE STORM DNINS. DIMENT DEPOSITION BY APPROPRI47E USE OF VEGETA77VE BUFFER STRIPS, SEDIMENT BARRIERS OR FILTERS, FROM S1, SCALE: 1 20' DIKES OR ,,' MULCHING, OR BY A COMBINATION OF THESE MEASURES AND OTHER APPROPR14TE BMPS. ELEMEN18 - STABILIZE CHANNELS AND OUTLETS. CLEARED AREA: 17,278 SF COVER ANY STORM WATER OUTLET PR07ECTIONS ARE PROPOSED. 4. ESC IIIIJ CD CATCH WINS DOWNSTREAM FROM �MUM REQUIREMENT - MAINTENANCE. ALL EROSION AND SEDIMENT CONIROL BMPS SHALL BE REGULARLY 1. C812 20 10 0. 20 40 THE SITE WfTH FILTER SOCKS TO GE 374.20 INSPECt"t AND MAINTAINED BY THE OWNER TO ENSURE CON77NUED PERFORMANCE OF THEIR INTENDED FUNCTION. ALL ELEMENT J9 - CONTROL POLLUTANTS. - PREVENT SffE RUNOFF PROM IE 370.031 MMNTEM NCE AND REPAIR SHALL BE CONDUCTED IN ACCORDANCE WITH THE MANUAL. ALL VEHICLES, EQUIPMENT AND PEP?OLEUM PRODUCT ENTERING PER EDMONDS STANDARD STORAGEIDISPERSING AREAS WILL BE INSPECTED REGULARLY To OTHER BMPS. AS REQUIRED BY THE CITY, OTHER APPROPRIATE BMPS TO M GATE E L;11111- -pt, w DETAIL E1.2 5. E4C EQUIREMENT III TH DETECT ANY LEAKS OF SPILLS, AND TO IDENTIFY WNTE)VANCE NEEDS .96th PIT W EX. 6" PVC AND PREVENT LEAKS OF SPILLS JL J-do vi 0 E (M'�';�OF INCREASED RUNOFF SHALL BE APPLIED. MONUMENT SET A CENTER OF PRE -DEVELOPMENT AND SEDIMENT CONTROL REQUIREMENT - UNDERGROUND U71LITY CONSTRUCTION. THE CONSTRUCTION OF ELEMENT J10 - CONTROL DEWA7ERING. CULDESAC PER CONTOURS 6. EROSIOA PLAT ENGINEERING TEMPORARY A EX. 8 CUP UNDERGI(OUND UTILITY LINES SHALL SPECIFICALLY ADDRESS THE FOLLOWING. 7HESE WILL BE NO DEWATERING AS PART OF THIS CONSTRUCTION . � 1i PROJECT. ELEV. 385.58' CONSIRUC170M \DRWY J� A. EROS(ON CONMOL FOR EXCAVATED AND STOCKPILED MATERIALS, WMCE ELEMENT #Il- MAINTAIN BMPs. cap B. THE FTACEMENT OF EXCAVATED MATER14L WHERE CONSISTENT WITH SAFETY AND SPACE CONSIDERATIONS SHALL BE ALL TE,)C BMPS SHALL BE MAINTAINED AND REPAIRED AS NEEDED. co EXISTING G P C9,D ON THE UPHILL SIDE OF TRENCHES, E 362.37 LA CONTOURS MHJ10 E 358.37 1 11. ELEMENT #12 - MANAGE THE PROJECT. RIM 383.40 C. DEWATERING SYSTEMS (MUST DISCHARGE INTO SEDIMENT TRAPS, SEDIMENT PONDS, OR OTHER ACCEPTABLE 7HIS COULD BE ACHIEVED BY MINIMIZING THE EXTENT.AND DURATION IE.375.00 OF THE AREA EXPOSED AND BY EMPHASIZING EROSION CONTROL THEN 10, SEVIMEfff CONTROL. r 8 1 CITY OF EDMONDS 0. TR4C AND SPILLING OF MATERALS ON STREETS DUE TO HAULING; EXIST. SIV & DIW .7. - e" 16,695 DRAINAGE �ASEMENT E. DAILY$[ CLEANUP AND STREET MAINTENANCE, RESIDENPE N.) FF MAIN 01377.5 500 Z ADDITIO L ESC MINIMUM REQUIREMENTS FOR LARGER DEVELOPMENM ALL NEW DEVELOPMENT AND REDEVELOPMENT L011EST FOOTING 0 362 THMAT ODES LAND DISTURBING AC71VMES OF GREATER I PRIVATE DRAINAGE THAN, OR EQUAL TO, ONE ACRE IN ADDITION TO MEE77NG GAR4GE /F FOojjt4G EAWENT TO BENEFI� THE REQUIREMENTS SET FORTH ABOVE SHALL COMPLY WITH ESC REQUIREMENTS LISTED BELOW. ao sf SLAB @ 001-fom OPyio5g LOTS I-R 8. ESC REQUIREMENT - DELINEATE CLEARING AND EASEMENT LIMITS. IN THE FIELD, MARK CLEARING LIMITS 0 -, 377.5 312-po CB AND/d ANY EASEMENTS, SETBACKS, SENS177VEICRITICAL ARF54S AND THE BUFFERS, TREES AND DWNAGE COURSES. G 0 E456.50 < )A (,- - IE 1351.50 9. ESC A441 UM REQUIREMENT -SEDIMENT TRAPPING. PRIOR TO LEAVING THE SITE, STORM WATER RUNOFF SHALL PASS GRADI NG 0 UA A TITIES. THROUP A SEDIMENT POND OR SEDIMENT TRAP, OR OTHER APPROPRIATE BMPS. SEDIMENT PONDS AND TRAPS, PERIM R DIKES, SEDIMENT BARRIERS, AND OTHER 8MPS INTENDED TO TRAP SEDIMENT ON-SI7E SHALL BE CUT: 50 Cu. Yds. 7 NG DECK GUN�ilff GIED AS A FIRST STEP IN GWING. THESE BMPS SHALL BE FUNC77ONAL BEFORE LAND DISTURBING ACTIWTIES FILL: 50 Cu.Yds. TAKE P1 CE EARTHEN STRUCTURES, SUCH AS DAMS, DIKES, AND DIVERSIONS SHALL BE SEEDED AND MULCHED 'F (GR4 8,658 S7 ACCORD G TO AN APPROVED TIMETABLE. YD 4 It GE 387.43 16 STORMWATER DING QUANTITIES WERE CALCULATED USING THE LAND -11 DETENTION DEVELOPMENT DESKTOP COMPOSITE METHOD. CALCULATIONS DO NOT IE 384.43 PROP .60TTO& OF OTING 10. ESC IMUM REQUIREMENT - CUT AND FILL SLOPES. CUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTED CONTOURS VAULT ACCOqNT FOR SOIL SWELLING AND SHRINKAGE.) E IN I AA VNER THAT WILL MINIMIZE EROSION. IN ADDI170N, SLOPES SHALL BE STABILIZED IN ACCORDANCE WITH ESC "jgT60 /70.3 SF YDj1O REQUI, OENT NO. 2. GE 357.25 RESIANCE OL Y Pl�, VIEW :WAA MEE. IE J54.25 11. ESC MM IMUM REQUIREMENT - CONTROLLING OFF -SITE EROSION. PROPER77ES AND WATER WAYS DOWNSTREAM FROM FF MAIN @ 385,00 IIAN S ER D TRICTI It LOWEST F0077NG 0 376 DEVELOOM I. EKCESS CUT MAY BE SPRE4D ON SITE. ------- YETA Y SE ER EWT. ENT SITES SHALL BE PROTECTED FROM EROSION DUE TO INCREASES IN THE VOLUME, VELOCITY� AND PEAK FLOW TE OF STORM WATER RUNOFF FROM THE PROJECT SITE. 2. ANY SOIL REMOVED FROM THE SITE MUST BE HAULED TO A CIIY BOTTOM ---I \ I I I I --, "sN APPROVED SITE. ESC UM R STABILIZATION OF TEMPORARY CONVEYANCE CHANNELS AND OUTLEIS. ALL TEMPORARY OF FOOTING 1 12 EQUIREMENT ON- ANCE CHANNELS SHALL BE DESIGNED, CONSTRUCTED AND STABILIZED TO PREVENT EROSION FROM 7HE ELEV. 377.00' morio. 'CONVEY 6 7V;' 205 SfF,,," RIM J48 10) EXPECT VELOCITY OF FLOW FROM A TWO-YEAR, 24-HOUR FREQUENCY STORM FOR THE DEVELOPED CONDITION. T E. S C. LEGEND 11,002 SF YD IE 340. �O/ STABIL' TION ADEQUATE TO PREVENT EROSION OF OUTLETS, ADJACENT STREAM BANKS, SLOPES AND DOWNSTREAM SF RFAAC SHALL BE PROVIDED AT THE OUTLETS OF ALL CONVEYANCE SYSTEMS. Ap IE M7,20 IM 383.40 SF SF SILT I`ENCE A LES AD 375.0(Y 13. ESC Mll�JMUM REQUIREMENT - STORM DRAIN INLET PROTECTION. ALL STORM DP IN IN M E OPERABLE DURiNG 0 1: ER RUNOFF SMLL NOT ENTER THE CONVEYANCE SYSTEM '&a CONST01ICTION SHALL BE PROTECTED SO THAT STORM W47 WITHO I:FIRST BEING FILTERED OR OTHERWISE TREATED TO REMOVE SEDIMENT. GE 364.70 TEMPORARY CONSTRUCTION OL�MPIC WEW WATER 14, ESC RE �UIREMENT - REMOVAL OF TEMPORARY BMPS. ALL TEMPORARY EROSION AND SEDIMENT CONTROL BMPS SHALL ENTRANCE - BE REM VED WITHIN JO- DAYS AFTER FINAL SITE STABILIZATION IS ACHIEVED OR AFTER 774E TEHPOR4RY OMPS ARE NO IE 3361 70 ANO SEWER DISTRICT.-.' NEEDED. -OR ST LONGERI TRAPPED SEDIMENT SHALL BE REMOVED ABILIZED ON SITE. DISTURBED SOIL AREAS RESULTING SANITARY SEWER.�ES v. ..FR IRFMOVAL SHALL BE PERM4NENTLY.STABILIZED. _OM, CATCH BASIN INSERT C&,�ITROL; RE EYENT - DEWATERING CONSTRUC77ON SffEs. DEWATERING SYSTEMS SHALL PROTECTION (TYP.) 'E INTO A SEDIMENT SEDIMENT POND. Io- 16. 0 AND SEDIMENT CONTROL REQUIREMENT C'ON77?OL OF POLLUTANTS OTHER THAN SEDIMENT ON YD 8 DNS TION SITES. ALL POLLUTANTS OTHER THAN SEDIMENT THAT OCCUR ON SITE DURING CONSTRUCTION SHALL BE CLE4RING LIMITS C GE 377 8 HAND AND DISPOSED OF IN A MANNER THAT DOES NOT CAUSE CONIAMIN477ON OF STORM WATER. 1E 3.74M 17. EROSIO$ AND SEDIMENT CONTROL REQUIREMENT - FINANCIAL LIABILITY. PERFORMANCE BONDING, OR OTHER APPROfffIATE FINANCIAL INSTRUMENTS, SHALL 13E REQUIRED FOR ALL PROJECTS TO ENSURE COMPLIANCE WITH THE VEGETATION APPRMI) EROSION AND SEDIMENT CONTROL PLAN. [ORD. 3013 § 1, 1995]. -380- MULCH &IOR STRAW MAMNG ko PLASTIC COVER �AA. NOTES: 1. REPLACEMENT IS REQUIRED OF ANY PLAT IMPROVEMENTS THAT ARE DAVAGED DURING CONSTRUCITON. FLOW ARROW (EX.) 2. ENTIRE STORM SYSTEM ACCESS WILL BE FROM 96TH PL W, EVERY EFFORT SHALL BE MADE TO OBTAIN PERMISSION TO ACCESS TkE CITYOFEDMONDS TEMPORARY CONSTRUCTION CONSTRUCTION OR THE RAIN GARDEN FROM EDMONDS WAY ENTRANCE REQUIRED 4PPRO VED FOR CONSTRUCTION 3. SEE SITE PLAN AND DR0JN4GE1UTIU7`Y PLANS FOR MORE INFORMA77ON -340.1- CONC)Lympic VIEW FOR: TACT /GRATE PVBLIC WORKS DIRECTOR DATE ^TERISEWER D MH#10 ]STRICT RIM J41.28 1E 334.58 oTREET FILE c B SJR 07-12-2011 REVISIONS PER CITY STREET FILE SLOPE MAKIMUM DRIVEWAY REV. NO. DESCRIP77ON INITIALS DATE o ED 140k ln CBJ6 UTILI7 7 CONFLICT NOTE. GE 3;"2 1�,334.55 CA UTIO) V FILTER SOCK WITH THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE'LOCATION, OVER FLOW HOLES MATERIAL IN DIMENSION, AND DEPTH OFALL EXISTING UTILITIES WHETHER SHOWN ON FILTER FABRIC 25' MIN. RADIUS THESE PLANS OR NOT, BY P07HOLING THE UTILITIES AND SURVEYING THE �P CONTINOUS ROLLS. USE STAPLES TOR IS RES ONSIBLE FOR L S 000dCONTRAC HORIZONTAL AND VERTICAL LOCATION PRIOR TO CONSMUCTION. THIS AND QUARRY SPA L OR WIRE RINGS TO ATTACH FILTER FABRIC !-4" �MIN CIA NTROL AND DRAINAGE THEN SHALL INCLUDE CALLING UTIL17Y LOCATE @ 1-800-424-5555 SECURED TO. 2" x 2 FABRIC TO WIRE. EROSION 00 14'GA. WIRE FABRIC 1 8 -12 MIN. DEPT POTHOLING ALL OF THE EXIS77NG U77LIIIES AT LOCA77ONS OF NEW URL17Y vv\AAAAan�, INSIGHT ENGINEERING Co. CROSSINGS TO PHYSICALLY VERIFY WHETHER OR NOT CONFLICTS E)(ff. EQUAL. ff \AAAAA/ CATCH LOCA77ONS OF S41D UTILIIIES AS SHOWN ON THESE PLANS ARE BASED \AAAAA/ AAAAAAA/\_ s 4: AAAAA/\/\/\/\/\/\ AAAAAA/WV\_�_ UPON THE UNVERIFIED PUBLIC INFORMATION AND ARE SUBJECT TO 2 2". WOOD OR 'VWIR�E :MESH SUPPORT FE E 4VVV A1X4vvvvvvv TO UPPORT FILTER FA -a, \/\AA/\/V\/V\/VV C T WITH INSIGHT ENGINEERING C 25)303-9 EQUIVALENT IC. Xz \AAAAAAAA PROBLEMS PRIOR TO PROCEEDING W1 \AAAAAA S17E ADDRESS. 22804, 22806 CALL TWO (2) BUSINESS DAYS ACCUTABLE TIMTLVF- EDMONDS, WA. 98020 MATERIAL BEFORE YOU DIG 1-800-424-5555. R TOM OF FILTER SDII 35 TAX �CCOUNT NO.'S. BLD. 20100757 (U 1�kp 1p STRAW BALES MAY BE USED IN T Y BOT SM 40 CMBAU ERIAL 8' TO 12" 400re� BLD. 20100758 N CERTAIN CIRCUMSTANCES (SEE 6' MAX. H DETAIL E111). THIS APPLICAITON F818 AMCOR U SHALL BE MAINTAINED AT ALL R. .8# TIMES DURING CONSTRUCITON 14\ CONTRACTOR SHALL MAINTAIN TEMPORARY PROVIDE FULL WIDTH OF INGRESS/ PERIOD. WAS 2' X 20 WOOD POSTS OR EGRESS AREA NW114, NE114, SECTION 36, T.27N., R.3E., W.M. CONSTRUCTION ENTRANCE DURING THE PLACE 3/4"-1.5" WASHED GRAVEL IN EQUIVALENT CONSTRUCTION PERIOD, THE, TRENCH 'AND* ON BOTH SIDES OF APPROVED ..AS NOTED CLEARWATER Aq FILTER FABRIC. FENCE ON'THE SURFACE. CITY INSPECTION' RbQUIRED ON ALL 1TV INSPECTION REQUIRED ON ALL EROSION CONTROL EROSION CONTROL METHODS BEFORE CITY INSPECTION REQUIRED ON ALL EROSI5T� I N=R I N,, PEASURES BEFORE WORK CAN BEGIN. DWG nLENAME DESIGNED B NO.: CONTRACTOR/DEVELOPER SHALL MAINTAIN AND REPLACE 4�) OTHtR WORK CAN BEGIN. MEASURES BEFORE WORK CAN BEGIN. 6499 STRAW BALES TO INSURE PROPER ER08ION CONTROL, 100525-nN4L.DWG S.ROSE qViy 1*62o, 10-0525 ?oil F1 L TER FA BRIC FENCE F1 L M TION S YS TEMS STABILLZED CONSTRUCTIONENTRANCE YSEDDENT TRAP FOR CATCH BASINS SHEET TREMPH ME4N .'ING N, L ci NOT TO SCALE STO DIL. E1.3 ES B NOT TO SCALE SID D7L. El. 1 NOT TO SCALE SID DTL. E1.2 -7- /0? GRADING AND TESC PLAN Of 2 JUL 12 2 11 1 ING DFPAR�'!WENT trry ma EDMONDS _7607-77 04-.9 2,C�rO 073 2,t,-9/e) 7 5 CLCI%��Ke�� '1'3 C� qio I (-) o -7 �� 2,'7--'0_67 0 (4r q cil" -:PL vj NW114, NE114, SECTION 36, T.27N., ME, WX SNOHOPYRSH COUNTY, WASI-MVGTON WER WO US S URFA CE LOT # DRIVEWAY WALKWAY ROOF OUTLINE TOTAL IMP. AREA LOT 7 541 SF JO SF 1,512 SF 2,083 SF LOT 8 526 SF 80 SF 1,534 SF Z 140 SF TOTAL 4,223 SF BIORETENTION CALCULATIONS PER TABLE 5 BIORETENTION BOTTOM AREA = 4,223 SF x "�'/100 = 266' OR USE 11' WIDE BY 25' LONG POND BOTTOM WITH 6" OF PONDING DEPTH. DESIGN INFILTRATION RATE = 0.75 INCHES PER HOUR SCALE: 1 20' KEAN Ism KFAMNIEN I OEM CBJ2 20 10 0 20 40 GE 374.20 IE J 70.03 96th PL WN EX, 6" PVC STRIP DRAINS MONUMENT TO BE CONNECTED SET A CENTER OF e TO ROOF DRAINS CULDESAC PER EX. 8 CMP PLAT ENGINEERING A ELEV, 385.58' TRENCH FOR GAS, CABLE, POWER & PHONE \DRW.y TO PROPOSED RESIDENCE -.-N , 1 C813 (ALL NEW UTILITIES MUST BE UNDERGROUND) EXISTING A,) GE J62.37 'cl CONTOURS MHJ10 DRIV� ..., 6 IE 358.37 RIM 383.40 'SLOPE -9.5Z-:' IE 375.00 10' EXIST. S/W & 01W 8 CITY OF EDMONDS co li* 16,695 �5F URAINAGE WEMENT RESIDEN�E MAW @'377.5 50, LOWEST FOOTING 0 362 1p I PRIvATE DRAINAGE 20LF DPIVEWA GARAGE 11E.- 362.00' 6. EASAfENT TO BENEW X SLAB @ 3POUT Pvc IZ) LOT$At+L8T 4CCESS SLOPE +4% 4 DOWNS— J775 @ 359 'COLLECTbR TYP. CB#� TOP w/PIPE VAULT 8OTTfM 349.64 4` 66TING DRAlN ANCH(�RSt), GE 35 .50 COLLECTOR TYP. IE 13 .50 11L. %, - I /_ I YO GARAGE S @ 385. 0 81 658 SF L I GE 387.43 IE 384.43 TILI PROPOSED 4 SS LINE STORMWATER DETENTION - - - - - - - --- EA M VAULT f YD410 GE 35 7.25 4' OlWG DRAIN ILF RESIDE CE OLYMPI VIEW WA�ffl FF MAIN 0 385.00 LOWEST FOOTING 0 376 IIAND S WER DISTRIC LINE TO DRYWELL -_7'6� PVC /0 12.90X IE 354.25 20LF 00 NITAPY SEWER E$MT. 6" PVC A,j IE. 376.00' 4* 2 38LF 6 PVC 0 23.68X 4 6 DE K 11,002 SF YD 5 Ss GE 390.20 c MH 1 IE 387.20 HIM 56,5.40/ C-1 n_ C) IE 375,001 DRYWEI-S 1 '10 ;�Ob 3 Ixi lx3l ul. FILLED - -YD 9 w/GRAVEL yl GE 364.. 0 OL�MPIC VIEW WATER 55 iE JJ61.70 ANO SEWER DISTRICT -SANITARY SEWER ESMT. SEWER CLEANOUT 4E 362.00 r< 5 SEWER CLEANOUT AT E4SEMENT LINE *10 YD 8 (6- WflH 12' CAST IRON NOUT LOCKING LAMPHOLE COVER GE 377.88 IE 366.00 w1112' HEXBOLTS, T��) IE 374.88 SEWER CLEANOUT AT EASEMENT LINE ­'(6m WITH 12* 04ST IRON LOCKING LAMPHOLE COVER w1112- HEX�?OLTS, NP.) _380- LA YARD DRAN TABLE YD# P" IE J70.00 367.00 363.00 360.00 J54,00 J51.00 J49.75 347.00 J57.75 J55.00 IE. 340,10 A 3' HIGH WA, 31- 1 SL kaV GARDEN -340- BOTTOM AREA = 289 SF, 3:1 SLC PE SEE DETAIL THIS SHEET USE LOW PERMEABLE SOIL FOR BERM AREA se MH#?J 11 0.(0 40.00 DlAd 7,41 ')P MH#10 RiM 348. 10 IE 340,70 1E JJ4.5 8 0 J" A CB#6 3 ;n2 IE,334.55 EX. CB E TOP 337.28 NV 334.54 N NV 334.39 W ",-,FX. (RMH 4F 1. REPLACEMENT IS REQUIRED OF ANY PLAT IMPROVEMENTS THAT ARE DAMAGED DURING CONSTRUCITON. 2. SEE SITE PLAN AND DRAWAGEIUTILITY PLANS FOR MORE INFORMATION. RAIN GARDEN BOTTOM ql 1 COMPACTED 3" COARSE WOODCHIP MULCH Eli BERM (ABOVE PONDED AREA) R� J4 1. 00 - ------------------------------- ROCKLINED OVERFLOW INLET PIPE. SET 0.1" MIN. " Irl- ABOVE RAIN GARDEN FLOOR, (SEE NOTE 4) ...... .... Flow ROOF DRAIN IE. 340.10 340.50 - - - - - - - - - - - - - - - - - INSTALL RIP RAP DISPERSION PAD + PONDING DEPTH VARI SEENOTE 1 90LF 6" 7.67g FLOOR: 34 7. U2 3" COMPOST MULCH -j Z Ad IN PONDING ARE4 Z p- �-v -L-97- TYPICAL RAEV GARDEN DRARVAGE SECTION A -A N.Ts. RA17V GARDEN INSTALLATION NOTES: 1. PONDING DEPTH SHALL BE AS SPECIFIED IN TABLE 5 (6 OR 12 INCHES). 2. BIORETENTION SOIL DEPTH SHALL BE A MINIMUM OF 12 INCHES FOR FLOW CONTROL AND A MINIMUM OF 16 INCHES FOR WATER QUALITY TREATMENT. 3. SCARIFY SUBGRADE 3" MIN. BEFORE BIORETENTION SOIL INSTALLATION. 4. SIZE TO CONVEY DESIGN OVERFLOW. 5, APPROVED PLANTS FOR RAIN GARDEN PER GEOTECH ARE RED TWIG DOGWOOD, RUSHES, SEDGES, SALMONBERRY AND TWINBERRY AND ORNAMENTALS SUCH AS ROYAL FERNS, BIG -LEAVED LIGULARIAS OR VARIOUS PRIMROSES. luagbom Z 11%IP6 1:-Jill" JKII:KKI WI K141.%Ill. k-2 %.5pW.Ip 4 %ZK4%%p 16 4 d 6 it I I I .. I I '. .. -ir ; I e.10 I r % r WIN -. -t I T r I q I . I - Ill 3. 1 116 IN 1.0 IN. II I F-. vin%lvii %P.f.KW.%Tr% '.'% r . .. m - r .6ri r% , LlrN­A %, r jumaw jr cl rcmal% mi All IN.% ir Is -6 0 1110 10 .1 IN A 1,C Ll n mr lor r I Ill S% kit r I r.1 %6r a Ne if J* IJI-111 M-IJIM KO11- I %;J +-mIl.;II Ir.Lll+'M%r..;%L 1 0 Kim. NEI% A; -0 lie( I -% I 9-Ir-:1 1' 1. , - I 'I I 1 1-1 In IN .1 VII I 1 111-11 'NJ lI 06 LA. ' A':% I."IJX%.. :%M 5W.% A k :'I I m I Irl r% it r Y6 a a pi F I .-I L. IA0 .0 IL I..Lk%. 116 4.41�W Isspam.La fl.riN " 11 -1 4�m . I L-v -in I - b.1 -I IN I IN L.A Nrul hi I I u4m ri ANN dra6f M;;iV W-4-i" I-.?- 41 -11 1 11 rr r filr- I I Ara I lkriD r lk.-k7;kw 1 rr%ml im &-i orl I -. oa I r. I uLt s&I A L -.n maJ I.. L I I -%&h."I0l%pll6aI -mZ -rs has I "1 0 1 -1 1 1 J %. I � ; r . X. IN 1. '1 1 1 -7 P. -Ir e %# :i- I t. V? TA ? T ir4 : m -1 1 1 1 eq.A"e, f iley III 5r4ey Rt i'r. m IlLiLrd I Lm .1 i7W, it oex d'.vrel`rrNF:6 11 ol to U% I r :-I ir I I LAA IS . flIA-: @090 F LJ LI As IJMJ J I A.IA.L% L I e -rK­W' rN W.&LK6-e fn-e t13 lL%7rvlj* y1wreynh-4 yl '.,. I M--aj . 1. -L%D r a. . . .. I- .. .4 1 a um:. IN u ei. -% v%.r 16. A A ..A .111. LIN I- 110. 1- Ir % OF = IV C6 - rMlfi . IN 0 L.1 I PIP I IN %L lo. J06 &V NMI &TIMTCONTUCTNOTE.- CA M01 V. - THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, DIMENSION, AND DEPTH OF ALL EXISTING U77LITIES WHETHER SHOWN ON THESE PLANS OR NOT, BY POTHOLING THE UTILITIES AND SURVEYING THE HORIZONTAL AND VERTICAL LOCATION PRIOR TO CONSTRUCTION. THIS AND THEN SHALL INCLUDE CALLING UTILITY LOCATE @ 1-800-424-5555 POTHOLING ALL OF THE EXISTING UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY VERIFY WHETHER OR NOT CONFLICTS EXIST. LOCATIONS OF SAID UTILITIES AS SHOWN ON THESE PLANS ARE BASED UPON THE UNVERIFIED PUBLIC INFORMATION AND ARE SUBJECT TO VARIATION. IF CONFLICTS SHOULD OCCUR, THE CONTRACTOR SHALL CONSULT WITH INSIGHT ENGINEERING COMPANY TO RESOLVE ALL PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION. CUL TWO (2) B US17VESS DA YS BEFORE YOU -MG 1-800-dr.2-dr-5555 ,Alai WSW GENEWAL NOTES: 1, ALL MATERIALS AND WORK SHOWN ON THESE PLANS SHALL CONFORM TO THE CITY OF EDMONDS STANDARD PLANS AND DETAILS, THE FOLLOWING SPECIFICATIONS AND CODES, AND ALL OTHER APPLICABLE LOCAL MUNICIPAL, STATE, AND FEDERAL CODES, RULES AND REGULATIONS. - CURRENT INTERNATIONAL BUILDING CODE (18C) - 2010 WSDOT/APW4 STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION - WASHINGTON STATE DEPARTMENT OF ECOLOGY STORMWATER MANAGEMENT MANUAL FOR THE PUGET SOUND BASIN (CURRENT EDITION) 2. STANDARD PLAN AND TYPE NUMBERS INDICATED ON THESE DRAWINGS REFER TO CITY OF EDMONDS STANDARD DETAILS, UNLESS NOTED OTHERWISE 3. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOBSITE WHENEVER CONSTRUC71ON IS IN PROGRESS. 4. DEVIATIONS FROM THESE PLANS MUST BE APPROVED BY THE ENGINEER OF RECORD AND THE LOCAL GOVERNING AUTHORITY. 5. CONTRACTOR SHALL RECORD ALL APPROVED DEVIATIONS FROM THESE PLANS ON A SET OF "AS -BUILT" DRAWINGS AND SHALL SUMMARIZE ALL AS-13UILT CONDITIONS ON ONE SET OF REPRODUCIBLE DRAWINGS FOR SUBMITTAL TO THE OWNER PRIOR PROJECT COMPLETION AND ACCEPTANCE. A SET OF AS -BUILT DRAWINGS SHALL BE SUBMITTED TO THE C17Y OF EDMONDS PRIOR TO FINAL APPROVAL OF THE BUILDING OCCUPANCY/FWAL PROJECT APPROVAL. 6. ELEVATIONS SHOWN ARE IN FEET. SEE SURVEY FOR BENCHMARK INFORMATION. 7. THE LOCATIONS OF EXISTING UTILITIES AND SITE FEATURES SHOWN HEREON HAVE BEEN FURNISHED BY OTHERS BY FIELD SURVEY OR OBTAINED FROM AVAILABLE RECORDS AND SHOULD THEREFORE BE CONSIDERED APPROXIMATE ONLY AND NOT NECESSARILY COMPLETE. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO INDEPENDENTLY VERIFY THE ACCURACY OF ALL UTILITY LOCATIONS SHOWN AND TO FURTHER DISCOVER AND PROTECT ANY OTHER UTILITIES NOT SHOWN HEREON WHICH MAY BE AFFECTED BY THE IMPLEMENTATION OF THIS PLAN, CONTRACTOR SHALL VERIFY LOCATION, DEPTH, SIZE, TYPE AND CONDITION OF EXISTING UTILITY LINES AT CONNECTION OR CROSSING POINTS BEFORE TRENCHING FOR NEW UTILITIES. ENGINEER ASSUMES NO RESPONSIBILITY FOR THE COMPLETENESS OR ACCURACY OF THE EXISTING UTILITIES AND SITE FEATURES PRESENTED ON THESE DRAWINGS, ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF CONFLICTS THAT ARISE, 8. CONTRACTOR SHALL LOCATE AND PROTECT ALL UTILITIES DURING CONSTRUCTION AND SHALL CONTACT THE UNDERGROUND UTILITIES LOCATION SERVICE (1-500-424-5555) AT LEAST 48 HOURS PRIOR TO CONSTRUCTION. 9. CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AT THE PROJECT SITE BEFORE STARTING WORK AND SHALL NOTIFY OWNER'S REPRESENTATIVE OF ANY DISCREPANCIES. 10. PIPE LENGTHS WHERE SHOWN ARE APPROXIMATE AND MAY CHANGE DUE TO FIELD CONDITIONS. 11, CONTRACTOR SHALL OBTAIN A COPY OF THE GEOTECHNICAL REPORT (WHERE APPLICABLE) AND SHALL THOROUGHLY FAMILIARIZE HIMSELF WITH THE CONTENTS THEREOF. ALL SITE WORK SHALL BE PERFORMED IN STRICT COMPLIANCE WITH THE RECOMMENDATIONS OF THIS REPORT. 12, STRUCTUR41. FILL MATERIAL AND PLACEMENT SHALL CONFORM TO THE RECOMMENDATIONS OF THE PROJECT GEOTECHNICAL REPORT. 13, MANHOLES, CATCH BASINS, UTILITIES AND PAVEMENT SHALL BE4R ON MEDIUM DENSE TO VERY DENSE NATIVE SOIL OR COMPACTED STRUCTURAL FILL, IF SOIL IS DISTURBED, SOF� LOOSE, WET OR IF ORGANIC MATERIAL IS PRESENT AT SUBGRADE ELEVATION, REMOVE AND REPLACE WITH COMPACTED STRUCTURAL FILL PER GEOTECHNICAL REPORT, 14. SEE ARCHITECTURAL DRAWINGS TO DETERMINE IF FOOTING DRAINS ARE REQUIRED. FOOTING DRAINS SHALL NOT BE CONNECTED TO THE STORM SYSTEM. TIGHTLINE TO.DRYWELL AS SHOWN ON PLAN, 15, ALL REQUIRED STORMWATER FACILITIES MUST BE CONSTRUCTED AND IN OPERATION PRIOR TO INSTALLATION OF ANY PAVEMENT UNLESS OTHERWISE APPROVED BY THE ENGINEER. 16. ALL ROOF DRAINS AND CATCH BASINS SHALL BE CONNECTED TO THE STORM DRAINAGE SYSTEM, UNLESS NOTED OTHERWISE. 17. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERA41TS REQUIRED FOR INSTALLATION OF ALL SITE IMPROVEMENTS INDICATED ON THESE DRAWINGS. 18, AS A MINIMUM REQUIREMENT, ALL DISTURBED AREAS ON AND OFF SITE SHALL BE REPLACED WITH COMPOST AMENDED SOIL PER STORMWATER MANUAL DETAIL T5.13. 19, ALL DISTURBED SOIL AREAS SHALL BE SEEDED OR STABILIZED BY OTHER ACCEPTABLE METHODS FOR THE PREVENTION OF ON -SITE EROSION AFTER THE COMPLETION OF CONSTRUCTION. SEE EROSION CONTROL PLANS FOR SPECIFIC GRADING AND EROSION CONTROL REQUIREMENTS, 20. THE CONTRACTOR SHALL KEEP OFF -SITE STREETS CLEAN AT ALL TIMES BY SWEEPING. WASHING OF THESE STREETS WILL NOT BE ALLOWED WITHOUT PRIOR APPROVAL. 21. SLOPE OF FINISHED GRADE SHALL BE CONSTANT BETWEEN FINISHED CONTOURS OR SPOT ELEVATIONS SHOWN, a =OFEDMONDS APPROVED FOR CONSM UCTION , PUBLIC WORXS DIRECrOR DA7B 2 REVISED RAINGARDEN I SJR 109-21-20111 1 REVISIONS PER CITY SJR 107-12 2011 REV. NO, DESCRIPTION INITIALS I - TE INSIGHT ENGINEERING CO. P.O. BOX - 1478 EVERETF, WA 98206 (425) 303-9363 (425) 303-9362 FAX INFO@INSIGHTENGINEERING.NET S17F ADDRESS: 22804, 22806 96TH PL. W. EDMONDS, W4. 98020 TAX ACCOUNT NO.'S: BLD. 20100757 BLD. 20100758 WA 8 MV114, NE114, SECTION 36, T.27N., R.M., W.M. CLEARWATER Z, DWG FILENAME DESIGNED BY, DATE. SCALE. JOB NO.. 36499 100525-FINAL.DWG S.ROSE 0511712011 1 l`_-20 10-0525 I s T V, ONAL SHEET C2 DRANAGEIMIMS Of 2