Loading...
22912 EDMONDS WAY.PDF11111111111111 13938 22912 EDMONDS WAY 0 19 / . Af I ADDRESS:. TA-X ACCOUNTIPARCEL NUMBER: BUILDING PER -MIT (NEW STRUCTURE): COVENANTS (RECORDED) FOR: CRITICAL AREAS: DISCRETIONARY PERMIT #'S: DRAINAGE PLAN DATED: PARKING AGREEMENTS DATEI EASEMENT(S) RECORDED FOR: PERMITS (OTHER): DETERMINATION: Ej Conditional Waiver El Study Required Ej Waiver PLANNING DATA CHECKLIST DATED: SCALED PLOT PLAN DATED: SEWER LID FEE $: SHORT PLAT FILE: LOT: SIDE SEWER AS BUILT DATED: SIDE SEWER PERMIT(S),#: GEOTECH REPORT DATED: STREET USE / ENCROACHMENT PERMIT #: FOR: WATER METER TAP CARD DATED: OTHER: -,-",�o LID BLOCK: LATEMMS'PsTomis\Street File Checklist.doc 'i� 0 CtA - -�Sq Golder Associates Inc. 18300 NE Union Hill Road, Suite 200 Redmond, WA USA 980,52-3333 Telephone (425) 883-0777 Fax (425) 882-5498 www.goider.com REPORT ON ire I ZAO, HILLSIDE TERRACE GEOTECHNICAL INVESTIGATION EDMONDS, WASHINGTON Submitted to.- Hanz Lammersdorf Valhalla, LLC P.O. Box 251 Edmonds, Washington Submitted by: Golder Associates Inc. 18300 NE Union Hill Road Suite 200 Redmond, Washington 98052 Distribution: I Copies - Valhalla, LLC I Copies - A.D. Shapiro Associates 3 Copies - Golder Associates Inc. April 6, 2004 RECEIVED OCT 12 2004 PERMIT COUNTER t % h APP, L 1r4,--.ANT COPY, 043-1117.100 0406WrW1 OFFICES ACROSS AFRICA, ASIA, AUSTRALIA, EUROPE, NORTH AMERICA AND SOUTH AMERICA April 6, 2004 -1- 043-1117.100 TABLE OF CONTENTS 1.0 INTRODUCTION .............................................................................................................. I 2.0 PROJECT DESCRIPTION AND SITE CONDITIONS .................................................. 2 3.0 FIELD INVESTIGATION ................................................................................................. 3 4.0 SUBSURFACE CONDITIONS ........................................................................................ 4 5.0 DESIGN RECOMMENDATIONS ................................................................................... 6 5.1 General .......................................................................................................................... 6 .5.2 Foundations ................................................................................................................... 5.3 Retaining Wall Options and Design Criteria ................................................................ 6 6 5.4 Seismic Criteria ............................................................................................................. 7 5.5 Building Slabs .............................................................................. ................................ 7 5.6 Drainage Provisions ...................................................................................................... 8 6.0 STEEP SLOPE EXEMPTION ........................................................................................... 9 7.0 CONSTRUCTION CONSIDERATIONS ....................................................................... 11 7.1 General ............................. ....... *"** ...... * ... *-*,*,*"* ... ****,*",*,****"**,*,**I I 7.2 Sol] Nall Shoning Installation .............................................................................. ..... I I 7.3 Temporary Cut slopes ................................................................................................. 11 7.4 Subgrade and Footing Preparation .............................................................................. 7.5 Earthworks .................................................................................................................. 12 12 7.5.1 General ........................................................................................................... 12 7.5.2 Structural Fill Placement and Compaction .................................................... 7.5.3 Use of Excavated Solis .................................................................................. 12 12 7.5.4 Imported Fill Materials .................................................................................. 13 7.6 Geotechnical Construction Monitoring ....................................................................... 13 8.0 CLOSING ......................................................................................................................... 14 9.0 REFERENCES ................................................................................................................. 15 04OW4,W I Golder Associates 16,2004 LIST OF FIGURES Figure I Vicinity Map Figure 2 Site and Investigation Plan LIST OF APPENDICES Appendix A Test Pit Logs Appendix B Slope Stability Analysis 043-1117.100 0406(ArMl Golder Associates I 16,2004 1.0 INTRODUCTION 043-1117.100 Golder Associates Inc. (Golder) is pleased to present this report on our geotechnical Investigation for the proposed redevelopment of your property at 22910 Edmonds Way in Edmonds, Washington currently known as Hillside Terrace Apartments (Figure 1). The purpose of this investigation was to evaluate the soil and groundwater conditions, and the presence of fill at your property for your proposed construction apartments on our site. The scope of services for a geotechnical investigation, Phase I Environmental Site Assessment and a HazMat Survey for this site and another site were presented in a proposal to Valhalla, LLC dated February 27, 2004. Authorization to proceed with only the geotechnical scope of services at the Hillside Terrace Apartments was received from you on March 8, 2004. The scope of work included the following primary tasks: 0 Excavate seven test pits on the property, the excavator was provided by you; 0 Coordinate utility locate requests and schedule with the excavator operator; 0 Perform an engineering analyses to develop geotechnical recommendations for the design and construction of the apartment buildings and retaining structures; and 0 Preparation of this report. The scope of services was expanded and the budget increased on Thursday, April I to include Steep Slopes Exemption analysis and evaluation, which is being required by the City of Edmonds. The results of our study are summarized in the following sections of this report. Section 2 summarizes the project and site conditions, Section 3 summarizes Golder's geotechnical field investigation, Section 4 summarizes the geologic setting and the findings of our investigation, Section 5 presents our design recommendations, Section 6 presents our evaluation of the ste6ps slopes exemption, and finally Section 7 includes our discussion on construction considerations. Closing remarks are presented in Section 8, and references cited are listed in Section 9. I I I I I I 0 0406(Amll Golder Associates April 6, 2004 -2- 043-1117.100 2.0 PROJECT DESCRJPTION AND SITE CONDITIONS The Hillside Terrace project site is located at 22910 Edmonds Way in Edmonds, Washington. The project site currently has a single family house and a car port, scattered shrubs and small trees and grass lawns around the house. The house is currently occupied by rental tenants. The site topography lincreases from approximately elevation 352 feet at the street side of the property to 386 feet at the ack of the property. The front half of the site is relatively level. A slope with two narrow terraces is located along the back of the lot. The lower terrace is about 10 feet wide front to back and is at about elevation 360. The upper terrace is triangular in sharp and is located a little more than midway up the slope at the back of the parcel. The longest side of the upper terrace is approximately 30 feet along the west property line and tapers toward the east until it meets the slope about 15 feet from the east property line. The height from the base of the slope on the north to the top of the slope on the south is approximately 30 feet, elevation 356 feet to 386 feet. We understand that the property is included under the steeps slope ordinance and that a steep slopes exemption for development of this site is required. It is our understanding that the existing structures will be demolished for construction. The conceptual architectural plans for the Hill Side Terrace project, dated 01/06/04, show two three- story, wood -frame, multi -unit buildings with first level parking, which is at grade at the front - north side - of the lot and below grade at the back of the lot. The maximum depth of excavation needed for the proposed development is on the order of 20 feet on the back of the property and decreases toward the north. I I I I III I 0 0 04OW4HI Golder Associates I I I I I I I I I I I I I I I I I I April 6,2004 -3- 043-1117.100 3.0 FIELD INVESTIGATION A one -day field investigation was conducted on March 17, 2004. The investigation consisted of excavating seven geotechnical test pits (designated TP-1 through TP-7) at selected locations primarily on the slope at the back of the property. The depth of the test pits ranged from 3 feet below existing ground surface (bgs) at the front of the lot to 12.5 feet bgs at the top of the slope at the back of the lot. A site plan showing the existing topography and site features, and the proposed new buildings locations was provided by A.D. Shapiro Architects of Edmonds. The test pits were excavated by Northend Excavating of Edmonds using a Takeuchi TB-145, a small tracked excavator (trackhoe) under agreement with you. After the test pits were completed they were backfilled using the excavated soil and tamping with the excavator bucket. Some settlement of the backfilled soil can be expected over time. The general test pit locations were determined prior to the geotechnical investigation based on topography, proposed building locations and potential geotechnical issues. The actual locations were chosen in the field by Golder during the field investigation. The test locations were plotted on the site topographic survey by measuring distances from existing site features. Utility locating services for the site were coordinated by Golder prior to the field investigation. ne test pit locations are shown the Figure 2. Logging and sampling of soils were performed in accordance with Golder Associates Technical Procedure TP-1.2-6, "Field Identification of Soil", based on the Unified Soil Classification System (USCS). The soil conditions were examined and logged by the Golder Geologist. Pertinent information was recorded on field test pit logs, including soil classification, depths and locations, stratigraphy, soil moisture conditions, and other information. Samples of each soil unit encountered were collected from each test pit. The soils were classified in accordance with Golder Technical Procedure TP-1.2-6 and are summarized on the Sol] Description Index in Appendix A. All samples were placed in labeled one -gallon plastic zip -lock bags and taken to our laboratory for further classification. Summary test pit logs are presented in Appendix A. The soil contacts indicated on the logs represent the approximate boundaries between so]] types. The soil conditions were those recorded for the locations and dates excavated, and may not represent those of other times and locations. 0 040604mil Golder Associates I 16,2004 -4- 0 4.0 SUBSURFACE CONDITIONS 043-1117.100 Edmonds, Washington is located in the central Puget Lowlands and native soils are predominately glacial in onigin although more recent alluvial, marsh, lake, landslide and mad -made fill deposits are present over much smaller areas. The Edmonds area is generally underlain by a glacial sequence of soils including till, advance outwash and transitional beds (Minard, 1983). According to the geologic map by Minard (1984), the near surface geology in the vicinity of the parcel consists of till overlying advance outwash of the Vashon glaciation. Based on the subsurface conditions encountered duning our site investigation, the soil underlying the property from upslope to down slope consists of minor amounts of fill, weathered till, till and advance outwash. Generalized descriptions of the soil units encountered are provided below, in their descending order of occurrence: Topsoil: A thin layer of topsoil, containing leaves, roots and decayed organic matenial was present in all test pits and can be expected across the site. This material is relatively thin ranging 0 from 0.3 to 0.5 foot thick. Fill: Localized areas of fill were observed at the west side of the upper slope and terrace in test pits TP- I and TP-2 and across the lower terrace in test pits TP-4 an TP-5, The fill was thinner on the upper terrace and slope and ranged from 1.2 to 2.7 feet thick. The fill on the lower terrace was 2.7 feet thick in both test pits. The fill appeared to, be denived from local soils and consisted of loose to compact, nonstratified, fine to medium sand, little to some silt, little coarse sand, gravel and cobbles and none to some wood and charcoal. The fill has a SM or SM-SP soil classification. Based on site topography and the surrounding proper -ties, the fill was probably a result of development of adjacent properties and for leveling of the ground surface on the site. Weathered Till: Weathered till was observed in test pits TP-1, TP-2 and TP-3 on the upper terrace and slope and varied in thickness from 3.5 to 6.0 feet. The weathered zone of the till was characterized by orange -brown or yellow -brown color. Weathered till consisted of loose to compact, orange -brown or yellow -brown, nonstratified fine to medium sand, some silt, little to some coarse sand, gravel and little cobbles, none to little wood, damp. The USCS soil classification for weathered till was SM, SP or SM/SP. Till: Unweathered till was located below the weathered zone in test pits TP-1, TP-2 and TP-3, was gray in color and was denser than the overlying weathered zone generally being dense to very dense. The soil consisted of essentially the same gradation as the weathered zone above. The USCS soil classification of the till was also SM, SP or SM/SP. The till was observed to overlay advance outwash and varied in thickness from 1.2 to 4.0 feet thick. Advance Outwash: Advance outwash was observed as the lowest soil unit in test pits TP-1 through TP-5 and was the only unit observed in test pits TP-6 and TP-7. The advance outwash was overlain by fill in test pits TP4 and TP-5. ne advance outwash was generally gray, compact to very dense, nonstratified, fine to medium or fine to coarse sand with some gravel and cobbles, none to trace silt, no organics, and damp to moist. An upper weathered zone was observed in test pits TP4 through TP-7, which was loose to compact with an orange -brown or yellow brown color. The weathered zone of the advance outwash was about one foot thick in test pits TP-5 through TP-7 but was about 4.0 feet thick in test pit TP4, which was located at the base of the slope at the middle of the east side of the site. I 0 04OW4H I Golder Associates April 6, 2004 -5- 043-1117.100 No groundwater was observed in the test pits. The site slopes appeared to be stable with no indication of recent or ancient landsliding and no landslide deposits were observed. None of the following conditions were observed during our investigations: • No impermeable soils were interbedded with granular soils; • No springs or groundwater seepage; • No landslide deposits; and • No evidence of slope instability. 040W4rWi Golder Associates April 6, 2004 -6- 043-1117.100 5.0 DESIGN RECOMMENDATIONS 5.1 General The main geotechmcal issues at the site are cuts at the back of the slope and designation of the slope as a sensitive slope and specifically included the following: • Relatively large cuts at the back of the property to reach building foundation and slab elevations requiring temporary ground support; • Presence of small, uncontrolled fill deposits in areas of the site to be developed; and • Selection and design of a retaining wall system up to 20 feet high, which will need to accommodate surcharge loading associated with development of the adjacent sites. 5.2 Foundations The undisturbed, native compact to dense Outwash units or hard Till units are suitable for supporting lightly to moderately loaded foundations. Footings can also be supported on compacted structural fill provided any topsoil, underlying loose sod zones, and/or existing fills are stripped to firrn competent ground prior to placing the fill. Foundation design critenia include: • ALLOWABLE BEARING PRESSURE: 3,000 psf, this value can be increased by 1/3 for seismic design. • ALLOWABLE BASE FRICTION COEFFICIENT: 0.4 for outwash sand, 0.4 for Till • MINUAUM SIZE: 18-Inch width for continuous footings and 24 inches for isolated footings. • MINIMUM DEPTH: 18-inches below exterior grade for exterior footings; 6-inches below grade for interior footings. • ESTIMATED SETTLEMENT: Less than 1 -inch total and 1/2 differential settlement • EARTH PRESSURES: For walls free to rotate at the top, the earth pressure can be based on a fluid with a density of 30 pcf while 50 pcf should be used if the wall is restrained. These values assume a level backslope behindthe wall. Backslopes up from the wall will require increased pressures. • PASSIVE RESISTANCE ON SIDES OF SHALLOW FOOTINGS: For design purposes, we recommend that the allowable passive pressure be based on a fluid with a density of 300 pcf on the sides of bunied footings above the water table. This value can be increased by 1/3 for seismic or wind loads. 5.3 Retaining Wall Options and Design Criteria The soil conditions at the retaining wall location are considered suitable for a standard so]] nail wall and this ' is considered the most feasible type of retaining wall. However, other options for construction of a retaining wall exist and include the following: 0 Composite soil nail wall; 040604"1 Golder Associates I -April 6, 2004 -7- 043-1117.100 0 Soldier pile tie back wall; 0 Soldier pile wall with facing; or 0 Cast -in -place cantilever wall. These options have drawbacks not inherent in conventional soil nail walls including requining more space, potentially higher costs and more difficult construction. However, these options exist and alternatives to conventional soil nail walls can be evaluated as the design proceeds, if needed. 5.4 Seismic Criteria The current building standard in Washington State is the Uniffinn Building Code' (UBC, 1997). However, as of July 1, 2004 Washington will adopt the International Building Code`� (ICC, 2003) as the state standard for construction. The seismic design criteria for the site are presented below for both the UBC and the IBC because of the approaching adoption date. The current UBC seismic criteria at the project site is Seismic Zone 3 (UBC, 1997). Within this zone, a seismic zone factor (Z) equal to 0.30 is recommended for calculation of shear and lateral load imparted on structures during an earthquake. Based on the information obtained from the field investigation, Soil Profile Type Sc (UBC, 1997) should be assumed for design of structures. The site is underlain by a so]] profile consisting of dense and hard soil conditions with the depth to bedrock est mated to be greater than 100 feet. In resisting the lateral loads, both the base friction and passive pressures can be assumed to act together as presented above. If the buildings will be designed using the International Building Code (ICC, 2003), then the structures should use the following criteria based on the design procedure presented in the ICC. 0 Design accelerations are obtained from figures in the code that show contours of maximum considered ground motion. Two figures are provided; one for 0.2 second spectral response and one for 1.0 second spectral response, illustrated on IBC Figure 1615.1.1 and Figure 1615.1.2 respectively. Both of the figures give ground motion -parameters for a Site Class C soil profile (MC Figure 1615.1.1), which must be adjusted if the soil profile is different. For this site, we recommended the use of a Site Class C soil profile, which is defined by a stiff soil profile for the average properties in the upper 100 feet. The soils considered most susceptible to liquefaction generally consist of very loose to loose saturated granular deposits. in general, the site is underlain by compact to dense soils with some localized shallow zones of loose soils. Where encountered in the explorations the loose soils were relatively shallow and with no observed groundwater. We conclude that the potential for liquefaction at this site is negligible. 5.5 Buflding Slabs Conventional slab -on -grade floors can be supported on the compact to dense or hard native soils or on compacted structural fill. It is not recommended that floor slabs be supported on organic-ricb soils, topsoil, uncontrolled fill, loose, disturbed soils or wet soils. Should subgrade conditions be comprised of any of these soils, we recommend that they be removed and replaced with structural fill or that a structural slab be constructed. In places, loose, granular soils may be remediated by in -place compaction to provide adequate bearing. Fill placed beneath floor slabs shall be compacted to a minimum of 90% of the maximum dry density as determined by ASTM D-1557. All slabs should be underlain by a capillary break which consists of at least four inches of clean, free draining coarse sand or gravel meeting the gradations presented below. 0 04%04ffdl Golder Associates April 6, 2004 -8- Capillary Break Gradation Sieve Size Percent diameter (inches) Passing I Inch 100% Passing No. 4 0% to 70% No.10 0% to 10% No. 200 0% to 3% 043-1117.100 A vapor barrier consisting of heavy plastic sheeting should be placed over the capillary break. Two inches of clean drainage sand can be placed over the plastic sheeting at the owner's discretion to help cure the concrete. 5.6 Drainage Provisions The drainage system should consist of footing drains for all structures. The drainage system should consist of- • FOOTING DRAINS: A perimeter footing drain should be placed consisting of a 4-inch- diameter, heavy -walled, perforated PVC pipe or equivalent. The pipe should be surrounded by at least 6 inches of drainage gravel material as described above. Clean outs should be provided. • Wall Drains: Miffor drains or drain rock curtain. • DISCHARGE: The drainage system should drain by gravity if feasible to positive discharge such as the storm drain or infiltration system. If leak free walls are desired, a waterproof barrier, such as bentonite panels, should be placed on the outside of the concrete walls prior to backfilling. Any backfill below the groundwater table should consist of clean, free draining material, such as drain rock, pea gravel or coarse sand. A filter fabric will be required over the perforated pipe to prevent migration of the subgrade materials into the drainage system. 04OW4W] Golder Associates I I April 6, 2004 6.0 STEEP SLOPE EXEMPTION a 043-1117.100 The City of Edmonds is requiring a Steep slope Exemption evaluation for development of the site and Valhalla LLC, the developer, is requesting that a Steep slope Exemption be granted for the site slope. In order for a property to qualify for a steep slope exemption two sets of cn'teria need to be met. These cnitenia are, 1) Site Standards, and 2) Development Characteristics and are presented in the Steep Slopes Exemption document provided by the City, dated 02/27/02. A summary of the criteria include: 0 Site Standards — the physical features of the site and adjacent sites. - The site will be stable after the pennitted development is complete. - The development has to be located in an area that is either mapped as till, advance outwash, and or Olympia gravels on the "Geological Map of Edmonds East and part of Edmonds West Quadrangles", by J.P. Minard, or comprised of engineered fill placed, compacted observed and tested to confirm that the his is uniformly compacted on slopes of the same materials. Any fill must be placed under a legal grading permit, grading and fill were designed by an licensed professional engineer, underlying soils were prepared in accordance with engineering design and compaction testing confirins uniform compaction to the minimum specified density. The thickness of organics, debris, weathered soils, colluvial soils or loose soils on or adjacent to the step slope may not exceed three feet. In addition to the above, none of the following conditions can exist on the steep slope area: - Impermeable soils interbedded with granular soils, - Springs or groundwater seepage, or significant visible of groundwater seepage, or, - Previous landsliding or instability, or existing landslide deposits 0 Development Characteristics - criteria that the development has to put into place to qualify. - All excavations on steep slopes will not exceed 35-degrees down from the property lines, unless retained by structural shoring designed by a registered professional engineer, - All retaining structures shall be engineered structures conforming to the State Building Code. No rockenies greater than four feet in height are permitted. - A buffer of 15 feet shall be maintained - The proposed development will not decrease stability on any adjacent property. Requires an engineering analysis by a geologist or geotechmcal engineer licensed in Washington State, and include a description of the specific requested steep slope exemption and explain how the proposed exemption meets all of the criteria. 0 NOW4"l Golder Associates I I I I I I April 6, 2004 -10- 043-1117.100 Slope Stability Analysis As * a part of the steeps slope exemption, a slope stability analysis was performed on the native slope as it now stands using computer program SLIDE, version 5.0 by Rocscience, Inc. The results of the slope stability analysis are presented in Appendix B. The stability analysis was calculated for the entire slope, along the critical sections of the slope, and for seismic design criteria. The factor of safety for the entire slope — under static conditions was calculated at 2.8 and under seismic loading of 1.8. The section of slope with the lowest factor of safety of 1.4 was a very shallow surface section (less than 0.5 feet) of the fill between elevation 355 and 366 feet presented by test pit TP4. A global Factor of Safety of 1.5 is considered by the industry standard of care to be stable. This condition was achieved with the calculated factor of safety of 2.8. The shallow slump slip surface in the fill indicates a factor of safety of 1.4. However, these materials are planned for excavation and removal during the proposed development. The stability of the slope was verified during our field investigation. All sections of the slope view appeared to be stable. The proposed exemption meets the requirements for the Steep Slopes Exemption and include the following: - Retaining walls are recommended for cuts into the slope at the south half of the site including the south and west slopes. We recommend that a narrow section of slope at the south end of the east property line be removed. The retaining walls will produce stability equal to that of the current slope conditions. - The slope was mapped on the "Geological Map of Edmonds East and part of Edmonds West Guardangles", by J.P. Minard, as Till at the upper portion of the slope, and Advance Outwash at the lower portion of the slope Test pit sofl conditions confirmed the mapped units. Test pit logs are presented in Appendix A. - Grading and fills on the site will be engineered and designed by an licensed professional engineer and compaction testing will be performed during construction to verify that the fills are compacted to the design criteria. - Organic soils, debris, weathered soils, colluvial soils or loose soils will be removed or restrained by retaining walls during construction. - Excavations on the slopes will be retained by structural shoning or retaining wall designed by a licensed engineer or will not exceed 35-degrees. I I I I 0 04004H) Golder Associates I I I I I I I I I I I I I I I April 6, 2004 -11- 043-1117.100 7.0 CONSTRUCTION CONSIDERATIONS 7.1 General General geotechnical related site construction should consist of demolition of the existing house, site clearing, site grading, subgrade preparation, construction of retaining walls, casting of building walls, footings and slabs, placement and compaction of fills, and installation of the drainage systems. This section discusses selected elements of these construction issues. 7.2 Soil Nail Shoring Installation The basic concept of soil nailing is to reinforce and strengthen the existing ground by installing closely spaced steel bar inclusions commonly referred to as "nails" into a slope or excavation as construction proceeds from the top downward. This produces a reinforced zone that is itself stable and helps to support the unreinforced ground behind it. The nails are passive in that they are untensioned at the time of installation; over time, they become tensioned as they resist the deformation of the adjacent soil. The nail reinforcement improves stability by two ways. First, soil nails reduce the driving force along potential failure surfaces. Second, in ffictional soils, nails increasing the non-nal force and hence the so]] shear resistance along potential slip surfaces. Construction of a so]] nail wall involves the following major steps: I . Excavate soil, typically a 6 foot lift, leaving small berm in place. 2. Drill hole for the soil nail. 3. Install and grout nail. 4. Excavate out a berm to form vertical cut face. 5. Place drainage system. 6. Place water proofing (if specified). 7. Place reinforcements, bearing plates, and studs. 8. Apply sbotcrete wall. 9. Repeat process down to final excavation grade. 7.3 Temporary Cut slopes Based on the conceptual design, the maximum depth of the construction excavation will be about 20 feet. Safe temporary construction cuts are the responsibility of the contractor and depend on the details of the overall site and construction conditions at the time. We have observed stable unsupported slopes at this site on the order of IH:IV up to about 12 feet high. Within the dense till or advance outwash, cuts on the order I H: IV, up to 20 feet high appear to be feasible. The temporary cut slopes should be protected from precipitation and drying out. Direct rainfall or surface water can destabilize the face of the excavation, however, if the face becomes too dry, raveling will occur. We recommend that the temporary slopes be protected with v1squeen plastic sheeting secured in placed with stakes and sandbags. Alternatively, a flash coat of shotcrete (2-inches thick) will also protect the slope face from erosion and drying. If shotcrete facing is used to protect the slope, weep holes on 5-foot spacing are recommended to provide drainage of water that may build up behind the wall. 0 040604rnil GoOdev Associates I I I I I I I I I April 6, 2004 -12- 043-1117.100 7.4 Subgrade and Footing Preparation Based on the test pits, the foundation subgrade will likely consist of dense outwash sands and gravels, or gravelly sand, depending on the depth and elevation of the footing. The foundations below elevation 360 feet will be in the dense advance sands and gravels. The subgrade soils could become loosened and disturbed under the influence of surface water, groundwater, and construction equipment. The contractor will have to implement suitable procedures to protect the subgrade such as excavating with a back -hoe without tracking on the native soils, use of a crushed rock or gravel - working mat, soil admixing the subgrade, geotextiles and other suitable procedures during wet weather. Native competent subgrade that becomes loosened by the contractors operation, and wet and unsuitable soils should be over -excavated and replaced with a suitable fill material, or admix the soil with a moisture reducing agent or cement treated base (CTB), at the contractor's expense. The footing excavations should be free of any loose, soft disturbed material or water prior to placement of reinforcing bar and concrete. 7.5 Earthworks 7.5.1 General Although the site work will be mainly excavations, some structural fill may be required for backfill against walls, around foundations, and to establish final site grades. To the extent possible, the major earthwork should be completed during the dry time of year. Altho ' ugh feasible, earthwork construction during wet weather will significantly increase costs associated with off -site disposal of unsuitable excavated soils, increased control of water, and increased problems with subgrade disturbance and need for soil admixtures, gectextiles, or rock working mats. 7.5.2 Structural Fill Placement and Compaction Structural fill should be used below footings, slabs, and pavements. Structural fill should be a well - graded sand and gravel that when placed and compacted will meet the required compaction specification. Below all footings and within three feet of grade in pavement areas any fill should be compacted to at least 95 percent of maximum ASTM D 1557 dry density. Beneath floor slabs and other structural components such as utility service trenches, not underlying pavements of footings, a Minimum dry density of 90 percent ASTM D 1557 is required. If density tests indicate that compaction is not being achieved due to moisture content, the fill should be scarified, moisture - conditioned to near optimum moisture content, recompacted, and re -tested, or removed and replaced. 7.5.3 Use of Excavated Soils In general, organic material, silty soils, and the silts and clays should not be used for structural fill. The outwash sands and gravels are considered the best materials for use as structural fill provided that oversize material is removed and they are placed and compacted near the optimum moisture content and in accordance with the compaction requirements presented in Section 7.4.2., above. If density tests indicate that compaction is not being achieved due to moisture content, the fill should be scanfied, and moisture conditioned to near optimum moisture content, recompacted, and re -tested, or removed and replaced, 0 O4O6Wrrdl Golder Associates 16,2004 -13- 043-1117.100 7.5.4 linvorted Fill Materials If off -site structural fill is used during wet weather, it should be well -graded sand and gravel with less than 5 percent slit. Fills used for drainage should consist of washed gravels with less than 3 percent passing the No. 200 sieve or equivalent. 7.6 Geotechnical Construction Monitoring We recommend that a qualified geotechnical-engineering firm is on -site full time during critical aspects of the project. This would include installation of any shoring walls, footing and slab subgrade preparation, and placement of structural fills. Typically, geotechnical special inspection is required during the shoring and foundation phases of the project. 0406Nrall Golder Associates I 6,2004 0 8.0 CLOSING I I -14- 043-1117.100 This report has been prepared exclusively for the use of Vahalla LLC and their consultants and contractors for specific application for the Billside Terrace project. We encourage review of this report by bidders and/or contractors as it relates to factual data only (logs of bonings, conclusions, etc.). ne conclusions and recommendations presented in this report are based on the explorations and observations completed for this study and conversations regarding the proposed site develop and are not intended, nor should they be construed to represent, a warranty regarding the proposed development, but are forwarded to assist in the planning and design process. Considerable judgment has been applied in interpreting and presenting the results. Variations in subsurface conditions over small distances are common in glacial environments such as those encountered in Edmonds, and actual conditions encountered during construction may be different from those observed in the test pits. When the site project plans are finalized, we recommend that we be given the opportunity to review the plans and specifications to verify that they are in accordance with the conditions described in this report. The test pits were performed in general accordance with locally accepted geotechnical engineering practice, subject to the time limits and financial and physical constraints applicable to the services for this project, to provide information for the areas explored. There are possible variations in the subsurface conditions between the test borings and variations over time. It has been a pleasure to provide this consulting service to you on the Hillside Terrace project. If you have any questions, please call us at (425) 883-0777. Sincerely, GOLDER ASSOCIATES INC. c ael Lumpki G. Project Enginee Geologist n David M. Cotton, P.E. Principal JSS/CCK/se 0 040604FWI Golder Associates April 6, 2004 -15- 043-1117.100 9.0 REFERENCES Minard, J.P. (1984). Geologic Map of the Edmonds East and part of the Edmonds West Quadrangles, Washington, Miscellaneous Field Studies Map MF-1541, U.S. Geological Survey, Department of the Interior, Reston, Virginia. ICBO(1997). Uniform Building Code, International Code Council. Whittier, California ICC (2003). International Building Code. International Code Council, Country Club Hills, Illinois. 04004.A 1 Golder Associates I I I I I I I 0 I I 0 n I I I I I FIGURES I Golder Associates 4 X 02 be J? TK Mr. R We 00 31 t$ eD Me !AF sic w �- r—,�A IT, w T KI. r 0 2000 4000 FEET Source: USGS 7.5 Minute Series Topographic Map, Edmonds East Quadrangle (1984) I/wx .'A .wl�vl IMM1140 I N FIGURE SITE VICINITY MAP VALHALLA/HILLSIDE TERRACE APT/WA 0 DRAWING NO. 06431117100OOlfg0l.thIl DATE 04/05/04 DRAWN BY EL Gonder Assodates I I I I I I I I I I I I I I I APPENDIX A TEST PIT LOGS I Golder Associates I I I 11 I I I I I I ( M918 -G LOG OF TEST PIT TP-1 .. older 90- kasociates Temp 45 T Weather Lt. rain Engineer M. Stiehler Operator T. Zuanich Equipment Trackhoe Contractor Northend Excavating Date 3/17/04 Elevation 380.0 ft Datum MSL Job 043-1117.100.001 Location Southwest corner �;f- site S - I I I I I I I I I I 1 11 2 1 1 1 11 6 —12 L16 A 79 �MYOMK RIZZO,," ROM Bottom of Test Pit at 12.5 ft LITHOLOGIC DESCRIPTIONS AND EXCAVATION NOTES 0.0 - 0.1 ft: Surface A 0.1 - 0.3 ft: Dark brown, loose, silty fine to medium SAND, some gravel, organics and roots, damp to moist (SM). (TOPSOIL) B 0.3 - 3.0 ft: Gray, loose to compact, nonstratified, fine to medium SAND, some silt, little coarse sand, gravel and cobbles, damp (SM). (FILL) C 3.0 - 3.5 ft: Orange brown, loose to compact, nonstratified, silty fine to medium SAND, little coarse sand, gravel, cobbles, and roots, damp (SM). (WEATHERED GLACIAL TILL) D 3.5 - 9.0 ft: Gray, loose to compact, nonstratified, fine to medium SAND, some silt, little coarse sand, gravel, and cobbles, damp (9M/SP). (WEATHERED GLACIAL TILL) 5.0 ft: Becomes compact to dense, with some very dense lenses. (GLACIAL TILL) E 9.0 - 12.5 ft: Gray, dense, nonstratified, fine to coarse SAND, some gravel and cobbles, trace silt, damp (SP). (ADVANCE OUTWASH) M11. SAMPLES NO. DEPTH (ft) MOISTURE N 1 2.0 2 3.5 3 6.5 4 9.0 5 12.5 TIME DEPTH OF HOLE (ft) DEPTH TO W/L (ft) DEPTH TO SEEPAGE (ft) SPECIAL NOTES: Damp to the maximum depth excavated. I !2 In I 3. .0 MGoidelr LOG OF TEST PIT TP-2 Associates Temp 45 T Weather Lt. rain Engineer M. Stiehler Operator T. Zuanich Equipment Trackhoe Contractor Northend Excavating Date 3/17/04 Elevation 371.0 ft Datum MSL Job 043-1117.100.001 Location Near west prop. bound., mid- ay down slope N I I 1 11 2 1 1 1 11 6 S 2 6 A 0.0 - 0.3 ft: Dark brown, loose, silty fine to medium SAND, some gravel, organics, wood chips and roots, damp (SM). (TOPSOIL) B 0.3 - 1.5 ft: Gray, compact, nonstratified, silty fine to medium SAND, some gravel and cobbles, damp (SM). (FILL) 1.5 - 1.6 ft: Orange brown, loose to compact, nonstratified, silty fine to medium SAND, some gravel and roots, damp; discontinous layer (SM). (WEATHERED GLACIAL TILL) C 1.6 - 5.0 ft: Gray, compact to dense, nonstratified, fine to medium SAND, some sift, coarse sand, gravel, and cobbles, damp (SM). (WEATHERED GLACIAL TILL) 3.0 ft: At 3'- Becomes dense to very dense. (GLACIAL TILL) D 5.0 - 6.5 ft: Gray, dense to very dense, nonstratified, fine to coarse SAND, some gravel and cobbles, trace silt, damp (SP). (ADVANCE OUTWASH) SAMPLES NO. DEPTH (ft) MOISTURE 1 1.0 2 2.5 3 5.0 4 6.5 TIME DEPTH OF HOLE DEPTH TO W/L DEPTH TO SEEPAGE SPECIAL NOTES: Damp to the maximum depth excavated. 0 Golder LOG OF TEST PIT TP-3 Associates Temp 45 T Weather Lt. rain Engineer M. Stiehler Operator T. Zuanich Equipment Trackhoe Contractor Northend Excavating Date 3/17/04 Elevation 377.0 ft Datum MSL Job 043-1117.100.001 Location Near South -center prop. bound. S I 1 11 2 1 1 1 1 6 N 012 6 0.0 - 0.1 Ift: Surface A 0.1 -0.5ft: Dark brown, loose, silty, fine to medium SAND, some gravel, organics, and roots, damp (SM). (TOPSOIL) B 0.5 - 2.0 ft: Orange brown, loose, nonstratified, silty, fine to medium SAND, some coarse sand, gravel, cobbles, and roots, damp (SM). (WEATHERED GLACIAL TILL) C 2.0 - 5.0 ft: Yellow brown, compact, nonstratified, fine to medium SAND, some silt, coarse sand, gravel and cobbles, damp (SM). (WEATHERED GLACIAL TILL) D 5.0 - 6.5 ft: Gray, dense, nonstratified, fine to medium SAND, some sift, little coarse sand, gravel and cobbles, some lenses very dense (SWSP). (GLACIAL TILL) E 6.5 - 7.5 ft: Gray, dense to very dense, nonstratified, fine to coarse SAND, some gravel and cobbles, trace silt, damp (SP). (ADVANCE OUTWASH) SAMPLES NO. DEPTH (ft) MOISTURE M 1 1.5 2 3.0 3 5.0 4 7.5 TIME DEPTH OF HOLE (ft) DEPTH TO W/L (ft) DEPTH TO SEEPAGE (ft) SPECIAL NOTES: Damp to the maximum depth excavated. 0 Gold" LOG OF TEST PIT TP-4 Associates Temp 45 T Weather — Lt. rain Engineer M. Stiehler Operator T. Zuanich Equipment Trackhoe Contractor Northend Excavatinq Date 3/17/04 Elevation 364.0 ft Datum MSL Job 043-1117.100.001 Location Near east prop. bound., near base of slooe N 1 11 2 1 1 1 11 6 S 2 6 0.0 - 0.1 ft: Surface A 0.1 - 0.3 ft: Dark brown, loose, sifty fine to medium SAND, some gravel, organics, roots, damp (SM). (TOPSOIL) B 0.3 - 3.0 ft: Gray, loose to compact, silty SAND to SAND some silt, gravel and cobbles, some roots, woody debris and charcoal, esp. at 3 feet, damp (SM). (FILL) C 3.0 - 7.0 ft: Orange brown to yellow brown, loose to compact, nonstratified, sifty SAND some gravel, cobbles, roots, damp (SM). (WEATHERED ADVANCE OUTVVASH) D 7.0 - 8.0 ft: Gray, dense, some lenses very dense, nonstratified, SAND some gravel and cobbles, trace silt, damp (SP). (ADVANCE OUTVVASH) ji I D SAMPLES NO. DEPTH (ft) MOISTURE M 1 2.0 2 3.5 3 7.5 4 8.0 TIME DEPTH OF HOLE (ft) DEPTH TO W/L (ft) DEPTH TO SEEPAGE (ft) SPECIAL NOTES: Damp to the maximum depth excavated. I I I @Goidelr LOG OF TEST PIT TP-5 Associates Temp 45 OF Weather — Lt. rain Engineer M. Stiehler Operator T. Zuanich Equipment Trackhoe Contractor Northend Excavatinq Date 3/17/04 Elevation 361.0 ft Datum MSL Job 043-1117.100.001 Location Near west prop. bound., near base of slope E I I I I I I - I I I I I I -T---F---] W 12 16 —4 —8 I I I I L16 A; 1'. : t 1. jj J`fjj- - :..:I 'J-111-: D Bottom of Test Pit at 6.5 ft A 0.0 - 0.3 ft: Dark brown, loose, sifty fine to medium SAND, some gravel, organics, roots, damp (SM). (TOPSOIL) B 0.3-3.0fl: Gray, loose to compact, fine to medium SAND, some sin, little coarse sand, gravel and cobbles, damp, little debris (piece of plastic sprinkler line, frisbee, soda bottle) (SM-SP). (FILL) C 3.0 - 4.0 ft: Orange brown, loose to compact, nonstratified, silty fine to medium SAND some coarse sand, gravel, cobbles, roots, damp (SM). (WEATHERED ADVANCE OUTWASH) D 4.0 - 6.5 ft: Gray, dense, nonstratified, SAND some gravel and cobbles, trace sift to no silt, damp (SP). (ADVANCE OUTWASH) 6.0 ft: Decrease in sand size to fine to medium and trace sift, with some very dense lenses. SAMPLES NO. DEPTH (ft) MOISTURE M 1 2.0 2 4.5 3 6.5 TIME DEPTH OF HOLE (ft) DEPTH TO WIL (ft) DEPTH TO SEEPAGE (ft) SPECIAL NOTES: Damp to the maximum depth excavated. I O�ldLOG OF TEST PIT TP-6 er Wes Temp 45 T Weather Lt. rain Engineer M. Stiehler Operator T. Zuanich Equipment Trackhoe Contractor—Northend Excavating Date 3/17/04 Elevation 353.0 ft Datum MSL Job 043-1117.100.001 Location Rear yard, north of concrete ret. wall E 11 2 1 1 1 11 6 W -B C Bottom of Test Pit at 3.0 ft 4 L, A 0.0 - 0.3 ft: Dark brown, loose, silty fine to medium SAND, some gravel, organics, roots, damp (SM). (TOPSOIL) B 0.3 - 1.5 ft: Orange brown, loose to compact, nonstratified, fine to medium SAND, little silt, coarse sand, gravel, cobbles, roots, damp (SP/SM). (WEATHERED ADVANCE OUTWASH) C 1.5 - 3.0 ft: Gray, compact to dense, nonstratified, SAND some gravel and cobbles, trace silt, damp to moist (SP). (ADVANCE OUTWASH) SAMPLES NO. DEPTH (ft) MOISTURE N 1 1.0 2 3.0 TIME DEPTH OF HOLE (ft) DEPTH TO W/L (ft) DEPTH TO SEEPAGE (ft) SPECIAL NOTES: Damp from 0 to 3 ft. below ground surface. Moist at 3 ft. below ground surface. I @Golder LOG OF TEST PIT TP-7 Associates Temp 45 T Weather Lt. rain Engineer M. Stiehler Operator T. Zuanich Equipment Trackhoe Contractor Northend Excavating Date 3/17/04 Elevation 353.0 ft Datum MSL Job 043-1117.100.001 Location Near east -center Drop. bouna. N 11 1 T—T7 S 2 16 Bol 2 6 ]12 k, X% f�'- A B C torn of Test Pit at 2.0 ft A 0.0 - 0.3 ft: Dark brown, loose, silty fine to medium SAND, some gravel, organics, roots, damp (SM). (TOPSOIL) B 0.3 - 1.0 ft: Orange brown, loose to compact, nonstratified, fine to medium SAND some silt, coarse sand, gravel, cobbles, roots, damp (SM). (WEATHERED ADVANCE OUTWASH) C 1.0 - 2.0 ft: Gray, compact to dense, nonstratified, fine to medium SAND some gravel and cobbles, trace silt, damp (SP). (ADVANCE OUTWASH) SAMPLES NO. DEPTH MOISTURE (ft) M 1 2.0 TIME DEPTH OF HOLE (ft) DEPTH TO W/L (ft) DEPTH TO SEEPAGE (ft) SPECIAL NOTES: Damp to the maximum depth excavated. I I I I I I I I 11- I I I I I I I I I APPENDIX B SLOPE STABILITY ANALYSIS I Golder Associates I Slide Analysis Information Document Name File Name: static.sli Project Settings Project Title: SLIDE - An Interactive Slope Stability Program Failure Direction: Right to Left Units of Measurement: Imperial Units Pore Fluid Unit Weight: 62.4 Ib/ft3 Groundwater Method: Water Surfaces Data Output: Standard Calculate Excess Pore Pressure: Off Allow Ru with Water Surfaces or Grids: Off Random Numbers: Pseudo -random Seed Random Number Seed: 10116 Random Number Generation Method: Park and Miller v.3 Analysis Methods Analysis Methods used: GLE/Morgenstern-Price with interslice force function: Half Sine Number of slices: 25 Tolerance: 0.005 Maximum number of iterations: 50 Surface Options Surface Type: Circular Radius increment: 10 Minimum Elevation: Not Defined Composite Surfaces: Disabled Reverse Curvature: Create Tension Crack Loading I Distributed Load present: Distributed Load Constant Distribution, Orientation: Vertical, Magnitude: 1500 lb/ft Material Properties Material: Fill Strength Type: Mohr -Coulomb Unit Weight: 125 Ib/ft3 Cohesion: 0 psf Friction Angle: 32 degrees I I I I I I I I I I I I I I I Water Surface: None Material: Outwash Strength Type: Mohr -Coulomb Unit Weight: 135 lb/ft3 Cohesion: 0 psf Friction Angle: 38 degrees Water Surface: None Material: Weathered Till Strength Type: Mohr -Coulomb Unit Weight: 130 Ib/ft3 Cohesion: 200 psf Friction Angle: 34 degrees Water Surface: None Material: Till Strength Type: Mohr -Coulomb Unit Weight: 135 Ib/ft3 Cohesion: 400 psf Friction Angle: 38 degrees Water Surface: None Global Minimums Method: gle/morgenstern-price FS: 2.815230 Center: 167.960, 505.950 Radius: 152.519 Left Slip Surface Endpoint: 156.615, 353.854 Right Slip Surface Endpoint: 256.833, 382.000 Resisting Moment= 1. 13321 e+007 lb-ft Driving Moment=4.02527e+006 lb-ft Resisting Horizontal Force=70105.1 lb Driving Horizontal Force=24902.1 lb Valid / Invalid Surfaces Method: ale/moraenstern-Drice Number of Valid Surfaces: 4962 Number of Invalid Surfaces: 38 Error Codes: Error Code -101 reported for 1 surface Error Code -105 reported for I surface Error Code -113 reported for 36 surfaces Error Codes The following errors were encountered during the computation: - 10 1 = Only one (or zero) I I Isurface / slope intersections. 105 = More than two surface / slope intersections with no valid slip surface. I- 113 = Surface intersects outside slope limits. I I I I I I I I 11 I I I I a] Slide Analysis Information Document Name File Name: seismic.sli Project Settings Project Title: SLIDE - An Interactive Slope Stability Program Failure Direction: Right to Left Units of Measurement: Imperial Units Pore Fluid Unit Weight: 62.4 Ib/ft3 Groundwater Method: Water Surfaces Data Output: Standard Calculate Excess Pore Pressure: Off Allow Ru with Water Surfaces or Grids: Off Random Numbers: Pseudo -random Seed Random Number Seed: 10116 Random Number Generation Method: Park and Miller v.3 Analvsis Methods Analysis Methods used: G LE/Morgenstern- Price with interslice force function: Half Sine Number of slices: 25 Tolerance: 0.005 Maximum number of iterations: 50 Surface ODtions Surface Type: Circular Radius increment: 10 Minimum Elevation: Not Defined Composite Surfaces: Disabled Reverse Curvature: Create Tension Crack Loading Seismic Load Coefficient (Horizontal): 0. 155 1 Distributed Load present: Distributed Load Constant Distribution, Orientation: Vertical, Magnitude: 1500 lb/ft Material Prooerties Material: Fill Strength Type: Mohr -Coulomb Unit Weight: 125 Ib/ft3 Cohesion: 0 psf I I I I I I I I Friction Angle: 32 degrees Water Surface: None Material: Outwash Strength Type: Mohr -Coulomb Unit Weight: 135 lb/ft3 Cohesion: 0 psf Friction Angle: 38 degrees Water Surface: None Material: Weathered Till Strength Type: Mohr -Coulomb Unit Weight: 130 lb/ft3 Cohesion: 200 psf Friction Angle: 34 degrees Water Surface: None Material: Till Strength Type: Mohr -Coulomb Unit Weight: 135 lb/ft3 Cohesion: 400 psf Friction Angle: 38 degrees Water Surface: None 0 Global Minimums Method: gle/morgenstern-price FS: 1.810400 Center: 168.925, 498.824 Radius: 145.337 Left Slip Surface Endpoint: 157.985, 353.899 Right Slip Surface Endpoint: 255.382, 382.000 Resisting Moment=9.90594e+006 lb-ft Driving Moment=5.47167e+006 lb-ft Resisting Horizontal Force=64556.4 lb Driving Horizontal Force=35658.5 lb Valid / Invalid Surfaces Method: gle/morgenstern-price Number of Valid Surfaces: 4894 Number of Invalid Surfaces: 106 Error Codes: Error Code -101 reported for 1 surface Error Code -105 reported for 1 surface Error Code -108 reported for 4 surfaces Error Code -111 reported for 64 surfaces Error Code -113 reported for 36 surfaces Error Codes I I 11 The following errors were encountered during the computation: -101 =Only one (or zero) surface / slope intersections. - 105 = More than two surface / slope intersections with no valid slip surface. -108 = Total driving moment or total driving force < 0.1. This is to limit the calculation of extremely high safety factors if the driving force is very small (0.1 is an arbitrary number). -111 = safety factor equation did not converge -113 = Surface intersects outside slope limits. 4 Slide Analysis Information Document Name File Name: fill.sli Proiect Settinas Project Title: SLIDE - An Interactive Slope Stability Program Failure Direction: Right to Left Units of Measurement: Imperial Units Pore Fluid Unit Weight: 62.4 Ib/ft3 Groundwater Method: Water Surfaces Data Output: Standard Calculate Excess Pore Pressure: Off Allow Ru with Water Surfaces or Grids: Off Random Numbers: Pseudo -random Seed Random Number Seed: 10116 Random Number Generation Method: Park and Miller v.3 Analysis Methods Analysis Methods used: GLE/Morgenstern-Price with interslice force function: Half Sine Number of slices: 25 Tolerance: 0.005 Maximum number of iterations: 50 ISurface Option Surface Type: Circular Radius increment: 10 Minimum Elevation: Not Defined Composite Surfaces: Disabled Reverse Curvature: Create Tension Crack Loading 1 Distributed Load present: Distributed Load Constant Distribution, Orientation: Vertical, Magnitude: 1500 lb/ft Material Properties Material: Fill Strength Type: Mohr -Coulomb Unit Weight: 125 Ib/ft3 Cohesion: 0 psf Friction Angle: 32 degrees I I F1 I I I I I I I I I I Water Surface: None Material: Outwash Strength Type: Mohr -Coulomb Unit Weight: 135 Ib/ft3 Cohesion: 0 psf Friction Angle: 38 degrees Water Surface: None Material: Weathered Till Strength Type: Mohr -Coulomb Unit Weight: 130 Ib/ft3 Cohesion: 200 psf Friction Angle: 34 degrees Water Surface: None Material: Till Strength Type: Mohr -Coulomb Unit Weight: 135 Ib/ft3 Cohesion: 400 psf Friction Angle: 38 degrees Water Surface: None Global Minimums Method: gle/morgenstern-price FS: 1.401660 Center: 157.415, 405.520 Radius: 51.172 Left Slip Surface Endpoint: 172.740, 356.696 Right Slip Surface Endpoint: 182.124, 360.708 Resisting Moment=7371.2 lb-ft Driving Moment=5258.9 lb-ft Resisting Horizontal Force=131.579 lb Driving Horizontal Force=93.8735 lb Valid / Invalid Surfaces Method: ale/moroenstern-Drice Number of Valid Surfaces: 4938 Number of Invalid Surfaces: 62 Error Codes: Error Code -109 reported for 1 surface Error Code -111 reported for 18 surfaces Error Code -113 reported for 43 surfaces Error Codes The following errors were encountered during the computation: -109 = Soiltype for slice base not I I I I I located. This error should occur very rarely, if at all. It may occur if a very low number of slices is combined with certain soil geometries, such that the midpoint of a slice base is actually outside the soil region,even though the slip surface is wholly within the soil region. -111 = safety factor equation did not converge I- 113 = Surface intersects outside slope limits. I I I I I I I I I I I I I I LEGEND E9 TP-7 TEST PIT LOCATIONS (APPROXIMATE) BASE MAP PROVIDED BY A.D. SHAPIRO ARCHITECTS, DATED 01/06/04. (,ICADV>roiects\2OD4\043ill7\xIOD\001\0431117iOOOOlFOI dwo 0410WOU l.'I--r%A I —d- I —ti 0 20 40 1 11 - zz::9 SCALE IN FEET FIGUR,E 2 SITE PLAN AND TEST PIT LOCATIONS Valhalla/Hillside Terrace AptJWA Golder Assoal es FND. CONC. MON. 25 20. 17 W/ BRASS DISK 6�� 1775.94' W/'X' IN CASE 36 _41- 9-25-90 U-) 0) I FND. 2 1/2" IRON PIPE---" `W/RAMSET IN CONC. PLUG IN CASE 8-1-90 .LEGAL DESCRIPTION: ALL THAT PORTION OF THE NORTHEAST QUARTER OF THE NORTHEAST NE 1/4, NE 1/4 9SEC. 36 TWP. 27N RGE, 3E qW.M. -41-6.67,- N 228TH ST. sw 852.75' 436-08' N 00*34'51* E FND. 5* DIA. CONC. N 88*22155" W 2628.55' 133.55, MON. W/BRASS DISK W/PUNCH IN CASE 8-1-90 20.03'--/ &__61 *29'42-_"� R=410.23' L=440.30' WSDOT R=410.23' FND 2" DIA ALUM. CAP L=440.39' W/PUNCH IN PIPE DN. 0.9- IN CASE. 11-14-03 ,QUARTER OF SECTION 36, TOWNSHIP 27 NORTH, RANGE 3 EAST, W.M.. IN SNOHOMISH COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS: 10% BEGINNING AT THE SOUTH LINE OF THE NORTH HALF OF THE NORTHEAST QUARTER OF THE NORTHEAST QUARTER OF SAID SECTION .36, DISTANCE SOUTH 88-14'33" WEST 409.01 FEET FROM THE low SOUTHEAST CORNER OF SAID NORTH HALF THENCE RUNNING ALONG SOUTH LINE SOUTH 88*14'33" WEST 84.53 FEET; THENCE NORTH I u &to 1 0 QAD V 4UO - OV r QL I I V I Mr. ZOVU UMLKL T PAAKV I N Vr 9�VVN I T ROAD; THENCE SOUTH 38*01'10" EAST ALONG SAID MARGIN 100 FEET; THENCE SOUTH 15*43'18" WEST 169.06 FEET TO THE POINT D., OF BEGINNING; EXCEPT STATE HIGHWAY. A LEGAL PER PACIFIC NORTHWEST TITLE COMPANY OF SNOHOMISH COUNTY INC. DATED APRIL 9, 1999 AT 8:00 A.M. N R ­2 APPRO,rIVA 7F Z 0(^,A TION OF WA;FR LINEPERAS 411LrPZANSf)?0& Nl' 017Y OF ZO&ONVS RugLIC HvRffs A m 9, X. X'wl/ '0Av 6XIR9 NW CORNER 4� WOOD FENCE--�, 0'1�" N. W & 6' WOOD FENCE 19.2"S X 8.1'SE OF NE PROPERTY "Na CORNER ,0w R107gO 967 R-917-qO end' ;f EXCR 7)PZ-.? 48" ;r Rl'z 40. 619 lelvl6r' SE *R1PZ'.7Ze & 41RM0770N ,VOT a97%1N,4&,r &?,4X L r C4Nr4LE"WRa7 4.A. J/1 b1max", 444 10 w* co V 1-020 q0D ol . hg�"' ;. END 6' WOOD FENCE 13.7'SW X 1.4!SE OF IW PROPERTY CORNER �3-NW END ROCKERY '110 VNE X I&SE 116OF SW PROPERTY CORNER D A N g' .6# N -M IV . . . . . . . . . . . Ilk: EDGE OF LAWN CROSSES 0 11 .5 PROPERTY LINE 20.3'NE NW OF SW PROPERTY COR. 51xl 41 N. END 6' CHAINLINK FENCE 17.3'NE X 6.0'NW OF SW J79- -n PROPERTY CORNER JT7e - "i k. T. L 982- JJT84 6 moz 114'33* W 04-.53' (DdED) N 88119*55* W 184-5.3' SW CORNER 6' CHAINLIN FENCE 0.5W X 1.4'S OF SW PROPERTY CORNER , I \ 6' WOOD FitNCE CROSS�S PROP. x LINE 17.1'W 'OF SE PROP, COR. x NE CORNER 6' WOOD FENCE- 2.1'E X 0.3N OF SE PROP. CORNER (6,9-77) 1WON7A- 00 PARff 6' WOOD FENCE CROSSES PROP. LINE 97.6'SW OF NW` PROP. COR. qql�' R, 41L Rl 9, 44 9 ZIEFF '9 1 �:; "k? WOOD RAILROAD 71E WALL CROSSES PROPERTY LINE 96.0'NE OF SW PROPERTY CORNER SaIZOIN49 N. END HEDGE 86.6'NE X 2.8'SE OF SW PROP. CORNER GRAVEL CROSSES PROP.� LINE 57.9'NE OF SW PROPERTY CORNER FF", -1 -4 - 6 �b 6- " �'w ') -4 f ca �5- A9 p 41 "S.- END 5' HOGWIRE FENCE 24.9"NE X 1.8'SE OF SE PROPERTYCORNER 4 f-4 544 f 6' WOOD FENCE CROSSESPROP. LINE 1.8W OF SE PROP. COR. J5. 30 FND. 5" D I A * CONC. MON. W/BRASi DISK 31 W/PUNCH IN CASE B-1-90 fND. 5* DIA. CONC. MON. W/BRASS DISK W/PUNCH IN CASE 8-1-90 10 . cm 3i VICINITY MAP 00 220THIST SW w X 224TH ST SW 0 0 228TH ST SW 10 SITE 232ND S W cc _-232ND ST SW NTS 99 w w Z 10 0 ZD C4 0) 0 to 0 0 2 z I ps =20' CONTOUR INTERVAL = 2' 20' 20' 40" mm BASIS OF BEARINGS: ROS VOL. 34 OF SURVEYS PG.98 AF NO. 9102215002 & LOT LINE ADJUSTMENT AF 9905170971 DA13jM NAVD 88 BENCHMARK; SURVEY CONTROL PT# 23 TOP OF MON. IN CASE AT INT. 92ND AVE W. & 228TH ST SW -__--_ELEVATIO_N=367.97' _U8 S. LINE N. 1/2. NE 1/4, NE 1/4, SEC. 36, TWP. 27N, RGE 3E, W.M. 3-6 31 FND. CONC. MON. W/INVERTED NAIL IN CASE 9-25-90 FND. 3/16" ROD IN CONC. IN 2 1/2' IRON PIPE DN. 0.7' IN CASE 11-14-03 1=0 M WATER METER ,Q FIRE HYDRANT 04 WATER VALVE -0- UTILITY POLE UTILITY ANCHOR .-OHP-OVERHEAD POWER -SD-STORM LINE -SS- SEWER LINE -W- WATER LINE -G- GAS LINE GRASS S I TE BENCHMARK SURVEY LWEND + 004 SUBDIV. CORNER/FOUND FOUND CONC. MON. IN CASE SET CAPPEDREBAR LS 30450 0 SET LINE STAKE RECEyvim OCT 12 2004 PERMIT COUNTER THIS MAP IS A REPRESENTATION OF THE CONDITIONS At THE TIME THE FIELD SURVEY WAS:IPERFORMED. nr c 0- py 113 In li (L 2 (L pom WOO 'W> < mix 0 ::> z V) =)> z 0 _p in A ov, w mffi La Z -JZ CL < 8 loo: (L M CL_ Q Lu g co :?. ac Q 00 V75 Lq E-4 P4 P4 C) P-4 0 E-4 C�3 Z 0 P4 z 0 �D 0 SHT. I OF I JOB NO: 03-4043 MOM 6rAwlj RECEIVED OCT 12 2004 PERMIT COUNTER APPLI'(77'l, Nl COPY FND. CONC. MON. 25 20.17' W/ BRASS DISK 6;0Qj- 1775 .94 W/0X" IN CASE 36 9-25-90 0) FND. 2 1/2" IRON PIPE--" W/RAMSET IN CONC. PLUG IN CASE 8-1-90 LEGAL DESCRIPTION: All THAT PORTION OF THE NORTHEAST QUARTER OF THE NORTHEAST NE 1/4, NE 1/4 9SECO 36, TWP. 27N RGE. 3E oW.M. -416.67 228TH ST. SW N 8if-H-34- W 436.08' --------------- 852.61, TN 00*34*51* E FND. 5* DIA. CONC. N 88-2255- j-62-8 133 .6-57 -SUI36- ------ 133.55' MON. W/BRASS DISK W/PUNCH IN CASE B-1-90 20.03*--/ &-614-29*42"-� R=410.23' L=440.30' WSDOT R=410.23' L=440.39' FND 2" DIA ALUM. CAP W/PUNCH IN PIPE DN. 0.9 IN CASE. 11-14-03 QUARTER OF SECTION 36, TOWNSHIP 27 NORTH, RANGE 3 EASTI N^ W.M. IN SNOHOMISH COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS: BEG14NING At THE SOUTH LINE OF THE NORTH HALF OF THE NORTHEAST QUARTER OF THE NORTHEAST QUARTER OF SAID SECTION THE SOUTH 88*14#33" WEST 409.01 FEET FROM t6, DISTANCE RUNNING ALONG '4 SOUTHEAST CORNER OF SAID NORTH HALF; THENCE A:m 41. SOUTH 88*14'33" WEST 84.53 FEET; THENCE NORTH SOUTH LINE EAST 253.60 FEET TO THE SOUTHERLY MARGIN OF COUNTY 1:5*43'18" 0� ROAD; THENCE SOUTH 38'01'10" EAST ALONG SAID MARGIN 100 FEET; THENCE SOUTH 15*43*18" WEST 169.06 FEET TO THE POINT I Al OF BEGINNING; EXCEPT STATE HIGHWAY. LEGAL PER PACIF1 C NORTHWEST TITLE COMPANY OF SNOHOMISH COUNTY INC. DATED APRIL 9. 1999 AT 8:00 A.M. AAP,f0A%41A 7FL 490A 77ON Or #A' XR 'w, -n 2. LINE'PIR AS-9Z11L 7 PLANS rROV . . . . . . . . ... Pff* 017r OrZO&ON,9S PZ1,9NO WORIrS REVISED SLOPE LEGEND Color Range Beg. Range End Percent Area NW CORNER 4? WOOD FENCE EXMIMV MA 6' WOOD FENCE 19.21SW X &I'SE OF NE PROPERTY CORNER m �Z 0 40.00 9186.00 17.5 2792.81 19 /-SITE \BENCHMARK1 PIK NAIL LOCATED . _ �q _7_ __ 49.48'NE X 17.27'SE OF NW PROP. COR. ELEVATION=351.50' gmt irx es npr _v 4w, AF=J47.67 f6imp NOr a9b411V,4&6- &?,4;F N R VR8 �MR �p S ?f mgg A 0 19 VONTA VO )OARA" 9411ZOIN49 (,4 CON,00,) , -, - -.1 7__ __ _. _ - _ . - _40- 49 11-020 51 51A \IS A06 47)v �1111"' 4,7 j 46, x 61 WOOD FENCE CROSSES PROP. LINE 97.6SW OF NW PROP. COR. PAf 6__ �49 '51 1 1111 JII END 6' WOOD FENCE 113.7'SW X 1.4!SE OF R, 41L RO, 4, 0 77E NW PROPERTY CORNER ffiuk 110.1'NE X I&SE kAZOF SW PROPERTY CORNER WOOD RAILROAD TIE WALL I I M-A CROSSES PROPERIT UNL 96.0'NE OF SW PROPERTY CORNER 9611Z,91NO N. END HEDGE 86.6'NE X 20SE OF SW PROP. CORNER GRAVEL CROSSES PROP.-` LINE 57.9'NE OF SW PROPERTY CORNER EDGE OF LAWN CROSSES .4; PROPERTY LINE 20.3'NE w OF SW PROPERTY COR. N. END 6' CHAINLINK FENCE 17.VNE X 6.'O'NW OF SW PROPERTY CORNER ------ - N I N 6!' 011411WAVIt' /TA/6F SW CORNER 6' CHAINLIN FENCE 0.5'W X 1.4!S OF SW PROPERTY CORNER o .". gj v-4# ORA -7. z ;vw 11'33-W ".63' (DtED) 3 95V W t84.5,3' V 6' WOOD F�NCE CROSS�S PROP. LINE 17.1 *W OF - SE PROP� COR. %X0 NE CORNER 6' WOOD FENCE- 2XIE X O.VN, OF SE PROP. CORNER x I,--' 30 FND. 50 DIA. CONC. MON. W/BRASS DISK W/PUNCH IN CASE 31 8-1-90 Z io -0 C4 I 'to ZD 0 t4r) 0 0 z z _-FND. 5- DIA. CONC. MON. W/BRASS DISK W/PUNCH IN CASE 8-1-90 Wqmvmlffl�% ___U_0TH :ST SW w > x J (L-224TH ST,! SW 2 ____Z28TH ST SW 10 SITE 232ND ST SW 81 jt� -232-ND ST SW NTS 1 =20 CONTOUR INTERVAL = 2' 2 ? 201' 4p' SITE BENCHMARK S BASIS OF BEARINGS PK NAIL LOCATED gg ROS VOL. 34 OF SURVEYS PG.98 AF NO. 49.4VNE X 4.OWSE ®RO OF NE PROP. COR. 9102215002 & LOT LIIIE ADJUSTMENT AF ELEVATION=352.420 9905170971 DATUM;NAVD 88 ONTROL PT# 23 BENCHMARK SURVEY C AT INT. 92ND AVE TOP OF MON. IN CASE W. & 228TH ST SW 'n ELEVA ON=367.97' PA11?MZ 0 ... ... .... IN LEGEWD I M WATER METER FIRE H*DRANT 94 WATER VALVE -0- UTILITY POLE 40 C- UTILITY ANCHOR -OHP-OVERHEAD POWER -SD- STORM LINE _SS - SEWER LINE RA I?M D _W- WATER LINE G- GAS LINE 41 GRASS SITE 81 ENCHMARK- 10 10� .s S. END 5' HOGWIRE FENCE 24.9'NE X 10SE Or- SE PROPERTY CORNER N 881 QL55" 09.01 AVL S. LINE N. 1/2, NE 1/�. E 1/4 F w SEC 36 TWP 27N RGE 3 36 31 6- WOOD FENCE CROSSES PROP. 5 LINE 1.8'W OF SE PROP. COR. \1 d5i Q A 551, �h .HEDGE �E OF NEk NER 111-J4 W A5 18 IRCR NX & -Ir m rmn W unnumir mmrr 71.VNE X.6.2'SE OF SE -PROPERTY CORNER IcIr SSA(// 70P=J5,Y25 11-=J4552 07R 80 61'V,4NNrZ e'IN S1, O,Vr NX,) 1-0119 1,A, r FND. CONC. MON. W/INVERTED NAIL IN CASE 9-25-90 ND. 3/16* ROD IN CONC. JN 2 1/2" IRON PIPE'DN. :0.7' IN CASE 11-14-03 SURVEY LEGEND + w0-m SUBDIV. CO'RNER/FOUND S FOUND CO NC. MON. IN CASE 0 SET CAPPED REBAR LS 30450 0 SET LINE STAKE RECEIVED OCT 12 2004 PERMIT COUNTER THIS MAP IS A REPRESENTATION OF THE CONDITIONS AT THE TIME THE FIELD SURVEY WS:PERFORMED. a-11mly xfN tLOpy Imi I " 19 a CL m a. 0 �1 X. 0 < 2 5518 rj :) z fj) 0 >- n w 00 C coffi w z -JZ a. :) < ix <Ozo (L M rLu lie% pit C%j a Cb E- IN z 0 E-4 PL4 0 E­4 0 0 FEB 2 4 200 SHT. 1. Of I JOB NO: 03-4043 N— ��7�Po OCT 12 2004 PERMIT couNTER, FND. CONC. MON. 25 :9 20.17 W1 BRASS D I SK j;0Qj- 1775 .94' W/*X" IN CASE 36 9-25-90 FND. 2 1/2" IRON PIPE—' W/RAMSET IN CONC. PLUG IN CASE B-1-90 LEGAL DESCRIPTION: ALL THAT PORTION OF THE NORTHEAST QUARTER OF THE NORTHEAST NE 1/4, NE 1/4 �SEC* 36 TWP. 27N RGE. 3E qW.M. — - 228TH ST. sw N 880i-27-34;-w— —85237— 436.08, 852.61, w .N 00034'51* E FND. 5* DIA. CONC. N 88"22-55 2-628.55, SUBD- 13 �.55r E 133.55' MON. W/BRASS DISK W/PUNCH IN CASE 61 " 29 * 4i,--,� R=410.23' Lz440.30' WSDOT R=410.23' FND 2* DIA ALUM. CAP L=440.39' W/PUNCH IN PIPE DN. 0.9- IN CASE. 11-14-03 QUARTER OF SECTION 36, TOWNSHIP 27 NORTH, RANGE 3 EAST. W.M. IN SNOHOMISH COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS: BE014NING At THE SOUTH LINE OF THE NORTH HALF OF THE NORTHEAST QUARTER OF THE NORTHEAST QUARTER OF SAID SECTION t6, DISTANCE SOUTH 88014'33" WEST 409.01 FEET FROM THE CORNER OF SAID NORTH HALF; THENCE RUNNING ALONG SOUTHEAST SOUTH LINE SOUTH 88*14'33" WEST 84.53 FEET; THENCE NORTH . . . . . . . . . . 1:5*43'18" EAST 253.60 FEET TO THE SOUTHERLY MARGIN OF COUNTY .......... ROAD; THENCE SOUTH 3S*01'10" EAST ALONG SAID MARGIN 100 POINT FEET; THENCE SOUTH 15*43-18" WEST 169.06 FEET TO THE A� OF BEGINNING; EXCEPT STATE HIGHWAY. sz "T LEGAL PER PACIFIC NORTHWEST TITLE COMPANY OF SNOHOMISH COUNTY INC. DATED APRIL 9. 1999 AT 8:00 A.M. 1APPR0,r1#A rFZ 490A)70N 01AVA7FR ZIN-r,OZR A5-9Z11ff,0L.4NSAR0# UN. MONOS P4V9Z10 )W 01rr Or 10 AVORA�9 iM REVISED SLOPE LEGEND - - - - - - - - - - - - - Color Range Beg. Range End Percent Area NW CORNER V WOOD FENCE & 6- WOOD FENCE 19.2SW q X 8.1'SE OF NE PROPERTY 41 ?g 17.5 2792.81 CORNER 9186.00 40.00 01 -,11- CZ F 31- ww� 5, 71,6 F Ar=J47 8; .S Imp AR/1*1' Slff & 4 i9liffie,7142V 10. No r a qx 41m 4m, F 6 W, 4 7F RE- 4R-s, v x .......... Al 0% A at 01" NOR! e g:� R, .00 V -rI W� 19 VON7A- VO PARA"' (A CON,00) 10 1-020 4/1, fill 'o. x 1-J54- 6' WOOD FENCE CROSSES PROP. LINE 97.6'SW OF NW PROP. COR. '66... -T 6 1-N j 8 RHA 5Z 2 0. $7' #A04- WMO, RXILR01459 ;7Z-- WOOD RAILROAD TIE WALL CROSSES PROPERIT UNt 96.0'NE OF SW PROPERTY CORNER 9111LAINO N. END HEDGE 86.6'NE X 20SE OF SW PROP. CORNER GRAVEL CROSSES PROP.' LINE 57.9'NE OF SW PROPERTY CORNER 1 1-j 510 11 14, ORA tiz m S. END 6' WOOD FENCE 'NV0 113.7'SW X 1.4!SE OF NW PROPERTY CORNER '--NW END ROOKERY 110.1'NE X I&SE DOF SW PROPERTY CORNER M EDGE OF LAM CROSSES 4*) PROPERTY LINE 20.3'NIE 65 OF SW PROPERTY COR. N. END 6' CHAINUNK FENCE 5� . . . . . . . . . 5 g VNW OF SW 17.3!NE X 6. 4-- PROPERTY CORNER 3 -T80- M . . . . . . . . . . . . ....... 40, N 88011 9 53' (D&D) 5 N 880535-ww t84.53' C; SW CORNER 6' CHAINLIN FENCE O.VW X 1.4!S OF SW PROPERTY CORNER 6- WOOD F�NCE CROSS�S PROP. 0 LINE 17.1 *W OF SE PROP� COR. x X NE CORNER 6"WOOD FENCE- 2.1'E X 0.3!N.. OF SE, PROP. CORNER 4. p4 A) --m. rriv P nvkpvyimr. mriv.&. 71.3'NE X .6.2SE OF SE PROPERTY CORNER ZX SSA(// 70P=,Y5,Y246 IZ-=J4552 0)9? 80 V/-% F AV=6 011,4NNEZ e'IN SE, 0417'AIW�) 1-0/9 �--S. END 5' HOGWIRE FENCE b'' 24.9'NE X 1.WSE OF SE PROPERTY CORNER 6- WOOD FENCECROSSESPROP. LINE 10W OF SE PROP. COR. 9-1 20.03 30 FND. 5" DIA. CONC. MON. W/BRASS DISK W/PUNCH IN CASE 31 8-1-90 to LO w w 0 Z C*4 1 0). 10 rf) 0 0 FND. 5" DIA. CONC. MON. W/BRASS DISK W/PUNCH IN CASE 8-1-90 A6 4 09.01, S. LINE N. 1/2. NE 1/4, NE 1/4, SEC. 36, TWP. 27N, RGE 3E. W.M. 31 FND. CONC. MON. W/INVERTED NAIL IN CASE 9-26-90 AD 3/16* ROD IN CONC ,IN 2 1/2" IRON PIPE'DN. 6.7' IN CASE 11-14-03 I is =201 CONTOUR INTERVAL = 2' 2W 0 200 40' ROS VOL. 34 OF SURVEYS PG.98 AF NO. 9102215002 & LOT UNE ADJUSTMENT AF 9905170971 DATUM NAVD 88 BENCHMARK SURVEY CONTROL PT# 23 TOP OF- MON. IN CASE AT INT. 92ND AVE W. & 228TH ST SW ELEVA110N=367.97' M WATER METER FIRE H*DRANT 04 WATER VALVE -0- UTILIT* POLE UTILITY ANCHOR -OHP-OVERHEAD POWER -SD- STORM LINE -SS- SEWER LINE -W- WATER LINE -G- GAS LINE GRASS S I TE BiENCHM411K 1 SURVEY LEGEND + 004 SUBDIV. CbRNER/FOUND S FOUND CO;NC. MON. IN CASE 0 SET CAPPM REBAR LS 30450 0 SET UNEtTAKE RECEIVED OCT 12 2004 PERMIT COUNTER THIS MAP IS A.REPRESENTATION OF THE CONDITIONS AT THE TIME THE FIELD SURVEY WAS:PERFORMED. iti lid Ill 19 (L 2 0. 0 ce- <ce% a in l7i n Zcn 0 >- =) 0(n Mffi wz4z a. =) re <OZO (L M a 0 Ps 67- itt 1180 K E,4 too Cq, z 0 E--4 z 0-4 C) 0 E--4 z 0 FEB 2 4 2004 SHT. 1. Of 1 JOB NO: 03-4043 v -STREET FILI �-14 0 OCT 12 2004 PERMIT COUNTER