Loading...
23005 HIGHWAY 99.PDF1111111111 lill 11637 23005 HIGHWAY 99 *IN* -OFFICE COMMUNPAIGNS OATE dul� 17, TO Harry Whitcutt FROM William J. Nims Building Official 'Assistant Engineer of Field & Office SUBJECT: Fill Permit ADDlication 2300 We can not review the permit because of Inadequate plans. Please have the applicant provide this department with a plot plan which includes existing contours, drainage and proposed finished grade contours. WJN:mjr Attachment 12 2!6 - ig 75 ADDRESS: L!�C)D5 - H !�Zd-wp-j q9 TAX ACCOUNT/PARCEL NUMBER: Z'i�e :7 - " - c)'l /-/ zZL/2 BUILDING PERMIT (NEW STRUCTURE): COVENANTS (RECORDED) CRITICAL AREAS: DETERMINATION: E] Conditional Waiver [:] Study Required A Waiver DISCRETIONARY PERMIT #'S: DRAINAGE PLAN DATED: PARKING AGREEMENTS DA EASEMENT(S) RECORDED FOR: PERMITS PLANNING DATA CHECKLIST DATED: SCALED PLOT PLAN DATED: &ja Z'��d� SEWER LID FEE $:- LID SHORT PLAT FILE: LOT: BLOCK: SIDE SEWER AS BUILT DATED: SIDE SEWER PERMIT(S) #:-2�yl SOILS REPORT DATED: STREET USE / ENCROACHMENT PERMIT #: WATER METER TAP CARD DATED: OTHER&,al-Too-7,�& LATEMP\DST's\Fonns\Strzet File Checklist-doc 9 PLANNING DATA 0 New Commercial / Multi -Family Projects STREET:FEI Name: OT � Date: 2 - 0_\_ 0 Site Address: �3 � �— Plan Check BLD Project Description'. Use(s) Proposed: Allowed Use: (Y& NO) CUP File Number: To Allow What Uses: Legal Nonconforming Land Use Determination Issued: (YES Reduced Site Plan Provided: (YES / K(,� Zoning: Map Page: Comp Plan Designation: Corner Lot: NO) Flag Lot: (YES i ADI3 File Number (date waived): 4vf Lot Area: Lt<;_ 1-1 Plans Mat6h ADI3 Approved: (YES I NO) Shoreline Required: (YES N Critical Areas Determination #: CF,,R,) 00 El Study Required JR�`Waiver SEPA Determination: El Exempt Needed (for sites with 500 cubic yards of grading or within 200 feet of Puget Sound or Lake Ballinger. Requires: (1) Fee, (2) Environmental Checklist, and (3) APO List with notarized form). Required Setbacks <A - Street: CR Ll Side: Side: 0 ee�ir: Li ----I ActualSetbacks Street: q k Side: Side: Lot Coverage/FAR Required: Lot Coverage/FAR Provided: VA Lot Coverage/FAR Calculations: Building Height Datum Point: Datum Elevation: Maximum Height: Actual Height: 181 Subdivision: Lot Aggregation Required: V1 0 Landscavinq Landscaping Matches ADB Approved: Landscaping Bid Provided: (YES i NO) Bond Amount (100% Bid). - Plan Review By: Vec, AP -VA �-J* PLANNING DATA New Commercial I Multi -Family Projects STREET Commercial Parking Analysis Business Name Type/U . se Parking Ratio Tenant Area Required Parking Total Parking Required. - Total Parking Pro vided.- 3-7 ulti amily. Parking Anal is M F # Bedrooms per Dwelling Unit Parking Ratio # Units Required Parking Studio 1-2/D.U. 1 Bedroom 1-5/D.U. 2 Bedrooms 1.81D.U. 3 + Bedrooms 2.0/D.U. Total Parking Required. - Total Parking Provided. - Other Plan Review By: Ct" A..AkA of eb oubg DEPARTMENT OF BUILDINGS =Pau PER International Building Code Section I I I At: Occupancy established by this certificate: M —Building Permit #: Dwelling Units: N/A Construction: VB No. Stories: I Basement: NO Maximum Occupant Load ** 122 ** (Per IBC 1004) Room capacity signs, when required, must remain posted at afl times. Building Owner: SHIOMI INVESTMENTS LLC Owner Address: 9091 NE 37 TI PL BELLEVUE WA THE O'REILLY AUTO PARTS HAS BEEN INSPECTED AND APPROVED AS COMPLYING WITH THE REQUIREMENTS OF THE 2009 EDITION OF THE INTERNATIONAL BUILDING CODE AS ADOPTED BY THE CITY FOR THE GROUP AND DIVISION OF OCCUPANCY AND THE USE FOR WHICH THE PROPOSED OCCUPANCY IS CLASSIFIED. Issued this 27TH — day of FEBRUARY 2012 CHI BUI N F L BY: This cerlificate shall be posted in a conspicuous public area and shall not be removed, mutilated or obscured and s�h\lle maintained in legible 6on , dition at all times. Any change of occupancy or use requires a building permit and a new Certificate of Occupancy issued by the City of Edmonds Building Official. J 0 0 -6-b 20 to 0 (.S� City of Edmonds Traffic Impact Analysis Worksheet 01: EQ& Name of Proposed Project: At,��, 1:��LTc,�, ...... Owner/Applicant Applicant Contact Person: 24iLu-i A�rkonvs Sy�,-c-,4 IL�ic, c�&&CA Name Name ZS-3 FATVCIK� 'S. z-A NA Z'&AD Su�.OE, Street/Mailing Address Stree(Avlailing Address k11,014 City State Zip City State Zip Telephone: Telephone: 1'6-H Traffic Engineer who prepared the Traffic linpact Analysis (if applicable): (ISA v-vge4z,-r LpN�6� Firm Name Contact Name Telephone: q45 - 1,5111 i E-mail: -y-C101 THRESHOLD LEVELS OF ANALYSIS r ect Traffic Levels Sections to Complete -1.) Less than 25 peak -hour trips generated I and 7 on ly (Worksheet/Cliecklist) It. More than 25 peak -hour trips generated All sections 1. PROJECT DESCRIP'IION a. Location - Street address: 7,2-COS M-4 '19 VVA- (Attach a vicinity inap and site plait.) existing land usc: VACA�A: — F�34VIUPL L- SAUE3 c Spec osed e of development: Di6. �9-i'LS(-It:)Q�(#ofresideittialtiititsaiidlot-squai-efoolageofbuildiiig) F82 - Tru hnpaci AnahSis Workshect RESUB P,.q, I of 5 Revised on 6124110 OKI STREET FILE 1E1 - 12011 BUILDING DEPARTMENT CITY OF EDMONDS d. Date construction will begin and be completed: 70 c. Define proposed access locations: 5.111 PL A -NA 5, - TD'P-- I 0—r: ON 51— SW. f`.' Define proposed sight distance at site egress locations: 2. TRIPGENERATION Source shall be the Eighth Edition of tile Institute of Transportation Engineers (ITE) Trip Generation manual. For independent fee calculations, the current edition of the ITE manual may be used. ADT = Average Daily Traffic PM Peak -hour trips (AM, noon or school peak may also apply as directed by the City Engineer) a. Existing Site Trip Generation Table: Land Use Daily (ADT) PIM- Peak -Hour Trips IN OUT b. Proposed Project Trip Generation Table: Land Use Daily (ADT) PM Peak-HourTrips IN OUT c. Net New Project Trip Generation Table: Land Use Daily (ADT) PM Peak -Hour Tfips IN OUT %tq_ 6?CC-W-rJ v �a C %4 70) -pal FF ,AA4 d. State assumptions and methodology forinternal, link -diverted orpassby trips: Revised on 6'124110 F82 - Thifflic hupact AnalYsis Work-sheel Page 2 of 5 _T_01 3. TRIP DISTRIBUTION Prepare and attach a graphic showing project trip distribution percentages and assignments. For developments that generate over 75 peak -hour trips, the City Engineer reserves the right to require trip distribution to be determined through use of the City traffic model.' 4. SITE ACCESS ROADWAY/DRIVEWAYS AND SAFETY a. Have sight distance requirements at egress location been met per AASHTO requirements? b. Intersection Level of Service (LOS) Analysis: Intersections to be evaluated shall be determined by the City of Ednionds Traffic Engineer Existing Conditions LOS Delays Year of Opening LOS Delays Five Years Beyond Change of Land Use LOS Delays c. Describe channelization warrants: (Attach striping plan.) d. Vehicle Storage/Queuing Analysis (calculate 50% and 95 % queuing lengths): 50% 95% Existing Conditions Year of Opening Five Years Beyond Change of Land Use e. If appropriate, state traffic control warrants (e.g. stop sign warrants, signal warrants): f. Summarize local accident history 2 (only required for access to principal and minor arterials): 1 Available upon request at City of Edmonds Development Services Department 2 Available upon request at City of Edmonds Police Department Revised on 6124110 E82 - Traffic hnpact Analysis Worksheet Page 3 of 5 5. TRAFFIC VOLUMES Provide the following and other planned development traffic within the city.' a. Describe existing ADT and peak -hour counts (less than two years old), including turning movements, on street adjacent to and directly impacted by the project. b. Describe the estimated ADT and peak -hour counts, including turning movements, the year the project is fully open (with and without project traffic). c. Describe the estimated ADT and peak -hour counts, including turning movements, five years after the project has been fully open (with and without project traffic). d. State annual background traffic growth factor and source: 6. LEVEL OF SERVICE (LOS) ANALYSIS a. Summarize Level of Service Analysis below and attach supporting LOS analysis documentation. Provide the following documentation for each arterial street or arterial intersection impacted by ten or more peak -hour trips. Other City -planned developments, must also be factored into the LOS calculations. LOS LOS Existing Conditions Existing Delays Year of Opening With Project Without Project Five Years Beyond Change of Land Use With Project I I Without Project I I I b. Note any assumptions/variations to standard analysis default values and justifications: 1 A list of planned developments are available at the City upon request for public records Revised on 6124110 E82 - Traffic hnpact Analysis Worksheet Page 4 qf5 9 0 7. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the Edmonds Road Impact Fee Rate Study Table 4 (attached) and as identified in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC 18.82.130. CHANGE IN USE Fee for prior use shall be based on fee established at the time the prior use was permitted. If the previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04), the 2004 ECDC 18.92.120 impact fee shall be used. ITE Land Use Category Per Unit Fee Rate New se LA $ Prior Use $ Units in square feet Fee # of dwelling, vfp, etc. x 0 D $ (0, +5 x $ Z, CHU INew Use Fee: $ (p, 01 - I Prior UseFee: $ 'Z I Oq = I $ ti, 9 Z-0, -1 0 NEW DEVELOPMENT ITE I -and Use Category Per Unit Fee Rate New Use $ D OTHER Units in square feet, Fee # of dwelling, vfp, etc. x $ INDEPENDENT FEE CALCULATION: $200.00 (+consultant fee) J$ TOTAL TRAFFIC IMPACT FE E 1 $ City of Edmonds, Engineering Division Approval Date 'No impact fees will be due, nor will a credit be given, for an impact fee, calculation resulting in a net negative. Revised on 6(24/10 E82 - Traffic hyact Analjwis Work -sheet Page 5 of 5 4- rim0 Lovell-Sauerland & Associatest. 19217 36t.h Avenue W., Sijik- 106 Phone: (425)779-15q1 �i L)rnnwood. WA 9803b LSAcn.einccring.com Engineers Surveyors / Planners Development Consultants I CMA Architecture August 26 1h 2011 c/o Less Jessica L. Iverson LSA No 5331 219 North Second Street, Suite 301 Minneapolis, MN 55401-1454 Subject: O'Reilly Auto Parts - 23005 Highway 99, Edmonds, WA Supplemental Access Evaluation Mrs. Iverson: This traffic evaluation memo has been prepared to address the proposed O'Reilly Auto Parts site development access points. The memo is intended to supplement the City of Edmonds Traffic Impact Analysis Worksheel. The site is located on the southeast comer of Highway 99 and 230,h St SW in the easterly boundary of the City of Edmonds. The project proposes to create two access points for the nearly one acre site. One access will be on Highway 99 along the westerly boundary of the site in the location of an existing driveway cut access, and the other on 2301h St SW along the northerly boundary of the site. Highway 99 Access: The westerly access to Highway 99 is an existing access point approximately 180 feet south of 2301h St SW. Currently landscape vegetation impairs sight distance. If vegetation was trimmed the available sight distance at the Highway 99 access point would be well over 500 feet in both the south and north direction. 23e S1 SW Access: The northerly proposed site access is a new access located on 23 01h St SW (posted 25 mph). The proposed centerline of the access is approximately 70 feet east of the easterly curb -line of Highway 99. The proposed access point is located so that the access aligns with an existing access point to a strip retail center on the north side of 230" St SW. Aligning the two access points will reduce the chance of conflicting entering or exiting movements and is ideal. Once the northerly site access point is constructed and the existing vegetation is removed there will be clear sight distance to Highway 99 and beyond to the west leg of Sight distance to Highway 99 and 23 01h St SW, and sufficient length of sight distance is available to the east all the way to 76 1h Ave W, about 560 feet to the east. Conclusion: Upon installation and removal of existing vegetation the proposed access points of the site will have adequate sight distance. Attached is a site development plan and photos of the available sight.distance at both the Highway 99 and 2301h St SW access points. I trust this information fulfills the required access evaluation requirement of the City's Traffic Impact Analysis Worksheel. Please let me known if you have any questions or need additional information. Sincerely, Robert L. Long, P.E. August 26 1h 2011 Encl: A. Site Development Plan B. Site Access Photos s;P I" TV t7l, A X XZ V4 > f 4(j C I SIT * EDEVELOPMENT P�AN Ca Attachment A O'Reilly Auto Parts Supplemental Access Evaluation LSA No. 5331 August 2011 LEMON --Iry 77 - oz� .......... RECEIVED STREET FILE Gebtechnical Engineering Report Proposed O'Reilly Auto Parts 23005 State Route 99 Edmonds, Wa'shington For O'Reilly Auto Parts SEP 13 2010 BUILDING DEPARTMENT Wy OF EDMONDS 0 1 9 FROBINSON' NOBLE April 23, 2010 Mr. Curt McNay O'Reilly Auto Parts 233 South Patterson Springfield, MO 65802 Geotechnical Engineering Report Proposed O'Riailly Auto Parts 23005 SR99 Edmonds, WA RN File No: 2587-001A Dear Mr. McNay; This letter transmits three copies of our report for your proposed O'Reilly Auto Parts store located at 23005 State. Route 99 in Edmonds, Washington. The scope of our services is outlined in our Services Agreement dated April 7, 2010. We consider the ' site to be compatible for the planned store. The core of the site is underlain by glacial till (hardpan) which can provide adequate support for the structure. Some loose undocumented fill was encountered along the southeast side of the building down to an approximate depth of 9 feet. The fill can be removed and replaced. with structural fill to support the east side of the building. Our Geotechnical Engineering Report discusses methods to prepare the site, for your planned structure in detail. We appreciate the opportunity of working with you on this project. If you have any questions regarding this report, please contact us. Sincerely, Rick B. Powell Principal Engineer cc: Dale M. Allison, ATC-Director, National Client Management wwwrobinson-noble.com TABLE OF CONTENTS INTRODUCTION .......... ................................................................................................................................. 1 PROJECTDESCRIPTION ............................................................................................................................... 1 SCOPE......................................... .................................................................................................................. 1 SITECONDITIONS ....................................................................................................................................... 2 Surface Conditions ......... -------------------------------'---------.2 ' Geology ....................................................................................................................................................... 3 Explorations................................................................................................................................................ 4 SubsurfaceConditions ..................................................................................... !..................................... 4 HydrologicConditions .............................................................................................................................. 5 Lab Testing ........................................................................................ ....................................................... 5 GEOLOGICHAZARDS .................................................................................................................................. 6 ErosionHazard ........................................................................................................................................... 0 Seismic. Hazard .......................................................................................................................................... 0 CONCLUSIONS AND RECOMMENDATIONS .............................................................................................. 7 General................................................................................... .................................................................. Site Preparation and Grading .................................................................................................................... 8 StructuralFill .............................................................................................................................................. 8 GonoraL------------------------------------------------.O ` Materials................................................................................................................................................ Q Fill Placement ---..--—�..`— '.'.' .-- —.. ��. ----------------------------. Q Temporary and Permanent Slopes ......................................................................................................... 1O Foundotiono--------------------------'--------------------11 � Dn�nug*.:------.�-----------------------------------------12 Utilities...................................................................................................................................................... 13 PavementSubgrode................................................................................................................................ 13 CONSTRUCTION OBSERVATION ............................................................................................................. 14 USEOFTHIS REPORT ................................................................................................................................. 4 Robinson Noble, Inc INTRODUCTION This report presents the results of our geotechnical engineering investigation at, your proposed O'Reilly Auto Parts store located at 23005 State Route 99 in Edmonds, Washington. The project is located at the-south6ast corner of SR 99 and 2301h Street Southwest as shown on the Vicinity Map in Figure 1. You have requested that we complete this report to evaluate subsurface conditions and provide recommendations for site development. For our use i,n preparing this report, we have been provided with a site plan showing the proposed building and parking lot, dated March 4, 2010 and a Land Title Survey and Topographic Survey, dated February 24, 2010, prepared by Huitt-Zoliars. PROJECT DESCRIPTION The project will consist of a single story square commercial building with dimensions of approximately 85 feet, located in.the southeastern portion of the lot. A parking. lot is. planned on the west and north sides of the structure. We have not been provided with a grading plan, but we understand that site grading will include minor cuts and fills to create the parking lot. SCOPE The purpose of this study is to explore and characterize the subsurface. conditions and present recommendations for site development. Specifically, our scope- of services as outlined in our Services Agreement, dated Ap ril 7, 2010, includes the following: 1 . Review available geologic maps for the site. 2. Contact the free. utility locate service to have the locations.of underground utilities marked where they enter the site. Retain a utility locator to mark the on -site utilities with the exception of non-metallic pipes, which cannot be detected by this service. To reduce the likelihood of damaging on -site underground utilities- during our explorations, you should inform us of the location of any of these utilities. We cannot be held responsible for any damage to unmarked utilities. 3. Explore the site subsurface soil and groundwater conditions- with four boring� to a depth of approximately 15 feet. Haul the drill cuttings away and dispose of them off -site. Drilling contractor to be provided by us.. Robinson Noble, Inc Geotechnical Engineering Report O'Reilly Auto Part Store 23005 State Route #99 Edmonds, Washington RN File No. 2587-001A April 23, 2010 Page 2 4. Evaluate pertinent physical and engineering characteristics of the soils encountered in the borings based on the results of the borings and our experience. Conduct laboratory tests consisting of two grain -size distribution and about ten moisture content determinations. 5. Prepare a geotechnical report containing the results of our subsurface explorations, boring logs, site plan, and our conclusions and recommendations for geotechnical design elements of the project. Our report will include: 0 Description of the geologic materials encountered. 0 Description of depth to groundwater, if encountered. Discussion of seismicity at the site along with seismic design parameters including Site Class and site coefficients based on current IBC criteria. 0 Liquefaction analyses for the subsurface soil conditions. • Recommendations for foundation design. • Estimate the total and differential settlements Comment on any anticipated construction difficulties identified from the results of our site studies and from our experience on projects at similar sites. SITE CONDITIONS Surface Conditions The' irregular shaped project site is 0.997 acres in size and has maximum dimensions of approximately 205 feet in the east -west direction and 280 feet in the north -south direction. Access to the site is provided by 23 01h Street Southwest along the north side of the site and via State Route 99 along the west side of the site. Existing commercial property borders the site to the south and east. A driveway separates the southern edge of the project from existing commercial property. The majority of the site slopes gently down to the northeast at approximately 4 percent. There are slopes at the southern edge, the east side and in the northeast corners of the property. The slopes decline down to the neighboring properties.and are on the order of 3 Robinson Noble,'Inc Geotechnical Engineering Report O'Reilly Auto Part Store 23005 State Route #99 Edmonds, Washington RN File No. 2587-001A April 23, 2010 Page 3 to 5 feet tall. The slopes are inclined at roughly 3 Horizontal to 1 Vertical (3H:1V) to 5H: 1 V. An abandoned single story structure occupies the center of the property. Access to the structure is provided by a*gravel driveway off of State Route 99. The flat area and slopes of the site are well vegetated With grass, scotch brush, blackberry b ushes and various other types of vegetation Geology Most of the Puget Sound Region was affected by past intrusion of continental glaciation. The last period of glaciation, the Va shon Stade -of the Fraser Glaciation, ended approximately 1 0,000 to 11,000 years ago. Many of the geomorphi.c features seen today are. a result of scouring and overriding by glacial ice. During the Vashon Stade areas of the Puget Sound region were oVerridden by over 3,000 feet of ice.. Soil layers overridden by the ice sheet were compacted to a much greater extent than those that were not. Part of a typical glacial sequence includes glacial till. Glacial till is an unsorted mixture of sand, silt, and gravel that was deposited below the glacier, and is commonly referred to as hardpan." The glacial till has been consolidated under the weight of the glacier and exhibits both high strength and low permeability. Our site explorations encountered glacial till overlain by fill. The geologic units for this area are mapped on the Preliminary Surficial Geologic Map of the Edmonds East and Edmonds West Quadrangles, Snohomish and King Counties, Washington, by Mackey Smith (U.S. Geological Survey, 1975). The site is mapped a's being underlain by a deposit of Vashon Till. Vashon Till is described as poorly sorted, nonstratified'*fodgment till deposited as ground moraine. It is composed of a mixture of clay, silt,,sand, pebbles, cobbles and occasional large boulders. It is extremely compact and lacks surficial cracks or joints. Robinson Noble, Inc Geotechnical Engineering Report O'Reilly Auto Part Store 23005 State Route #99 Edmonds, Washington RN File No. 2587-001A April 23, 2010 Page 4 Explorations We explored subsurface conditions within the site on April 12, 2010, by drilling four borings with a truck mounted hollow stem' auger drill rig. The borings were drilled to depths of 15 feet below the ground surface. - Samples were obtained from the borings at 5-foot intervals by driving a split spoon sampler with a 140-pound hammer dropping 30 inches. The number of blows required for penetration of three 6-inch intervals was recorded. If the number of blows reached 50 before the sampler was driven through any 6-inch interval, the sampler was not driven further. To determine the standard penetration number at that depth the number of blows required for the lower two intervals are summed. The borings were located in the field by an engineer from this firm who also examined the soils and geologic conditions encountered, and maintained logs of the borings. The approximate locations of the borings are shown on the Sit e Plan in Figure 2. The soils were -visually classified in general accordance with the Unified Soil Classification System, a copy of which is presented as Figure 3. The logs of the borings are presented in Figures 4 through 7. Subsurface Conditions A b rief description of the conditions encountered in our explorations is included below. For a more detailed description of the soils encountered, review the boring logs in Figures 4 through 7. Borings 1 and 2: Our explorations on the southern and eastern corners of the planned building encountered appr oximately 9 feet of undocumented loose to medium dense fill. The upper 1 to 1. 1/2 feet consisted of bark and wood ch�ips. The remainder of the fill in Boring 1 consisted of dark brown to black silty sand with organics and gravel and brown fine to coarse sand with silty clay and gavel. The fill below the wood chips and bark in Boring 2 consisted of *organic silt with wood debris as well as silty sand with organics and silt. Dense to very dense glacial till was observed near the 9 foot depth in both Boring 1 and 2 and was observed down to the final depth explored of 15 feet. Robinson Noble, Inc Geotechnical Engineering Report O'Reilly Auto Part Store 23005 State Route #99 Edmonds, Washington RN File No. 2587-001A April 23, 2010 Page 5 Borings 3 and 4: Significantly less fill was observed in the borings located near the center of the western side of the planned building and in the northern portion of the planned parking lot. A foot of medium dense crushed rock was encountered at the surface of Boring 3. Roughly 3 feet of'wood chips was encountered at the surface of Boring 4. In both borings, very dense glacial till was encountered below the upper layer of crushed rock and wood debris. The till was observed down to the final depth of 15 feet. Hydrologic Conditions With the exception of some slight groundwater seepage' near the 13 foot. depth in Boring 2, groundwater was not encountered. The bark, wood chips and the organic silt at the 2.5 to 4.0 foot depth in Boring 2 were wet. The glacial till in Borings 3 and 4 had moisture contents less than 10 percent and the till in Borings 1 and 2 had moisture contents between 9 and 16 percent. The dense to very dense till interpreted to underlie the site is considered poorly draining. During the wetter times of the year, we expect perched water conditions will occur as pockets of water on top o f the till layer. Oerched-water does not represent a regional groundwater "table" within the upper soil horizons. Volumes of perched groundwater vary depending upon the time of year and the upslope recharge conditions. Lab Testing Moisture Content Evaluation: Samples were obtained i'n the field during the exploration process, properly sealed in plastic bags and then promptly taken to the lab to determine the moisture content. The moisture content for each sample was determined by first weighing the moist soil sample and then baking the moisture out of the sample to determine the weight of water within the sample. The moisture content is the result of dividing the.weight of the water by the weight of the dry soil after baking. The.results are shown on the Boring Logs in Figures 4 through 7. Wet Sieve Analyses: Wet sieve analyses were performed to determine the grain size Robinson Noble, Inc Geotechnical Engineering Report O'Reilly Auto Part Store 23005 State Route #99 Edmonds, Washington RN File No. 2587-001A April 23, 2010 Page 6 distribution of two of the soil samples. One was performed on the glacial till encountered at the bottom of Boring 4 and the other was performed on the undocumented fill which was at the 8 foot depth in Boring 1. We chose to p erform,the grain size analysis on the fill because it visually appeared suitable -to be used as structural fill onsite and the test confirmed that. We performed the sieve analyses in general accordance with ASTIVI D 422 and the results are shown in Figures 8 and 9. GEOLOGIC HAZARDS Erosion Hazard The erosion hazard criteria used for determination of affected areas includes soil type, slope gradient, vegetation cover, and groundwater conditions. The erosion sensitivity is related to vegetative cover and the specific surface soil types (group classification), which are related to the underlying geologic soil units. We reviewed t he Soil Survey of Snohomish County Area, Washington by the Soil Conservation Service (SCS) to determine the erosion hazard of the on -site soils. The site surface soils were classified using the SCS classification system as Alderwood-Urban Land Complex, 2 to 8 percent slopes (Unit 5). The corresponding geologic unit for these soils is till, which is in agreement with the soils encountered in our site explorations.. The erosion hazard for the soil is listed as being slight for the gently sloping conditions at the site. Seismic Hazard It is our opinion based on our subsurface explorations that the Soil Profile in accordance with Table 1613.5.2 of the 2006 International Building Code (IBC) is Site Class C As referenced in the 2006 IBC, we used the US Geological Survey program "Seismic Hazard Curves and Uniform Hazard Response Spectra." That program uses 2003 NEHRP Seismic Design Provisions to obtain values for S., S1, F,,, and F,. The seismic design parameters are: Sr, 119.6% g Robinson Noble, Inc Geotechnical Engineering Report Q'Reilly Auto Part Store 23005 StateRoute #99 Edmonds, Washington RN File No. 2587-001A April 23, 2010 Page 7 S, 41.8% g F. 1.0 F, 1.4 Site specific coefficients and adjusted maximum considered earthquake spectral response acceleration parameters apply as shown in Section 1613.5 of the IBC. Based on the USGS data and Tables 1613.5.60) and (2), the site has Seismic Design Category D. Additional seismic considerations include liquefaction potential and amplification of, ground motions by soft soil deposits. The liquefaction potential is highest for loose sand with a high groundwater table. The underlying dense till is considered to have a very low potential. for liquefaction and amplification of ground motion. CONCLUSIONS AND RECOMMENDATIONS General It is our opinion that the site is compatible with the planned development. The underlying dense to very dense glacial, till deposits are capable of supporting the planned structure and pavements. We recommend that the loose fill be removed from the building footprint and then backfilled with structural fill. Please. refer to the Structural Fill section for recommendations for fill placement. The foundations should bear on the underlying native glacial till, or on structural fill extending to these soils. Based on our site explorations, we anticipate these soils will generally be encountered at the. 9 foot depth on the east side of the planned building and at typical footing depths on the west side of the planned building. The soils likely to be exposed during construction are highly moisture sensitive and will disturb easily when wet or during wet conditions. We recommend that construction take place during the drier summer months, if possible. If construction takes place during the wet season, additional expenses and -delays should be expected due to the wet conditions. Additional expenses could include costs for an increased depth of site stripping, export of Robinson Noble, Inc Geotechnical Engineering Report O'Reilly Auto Part Store 23065 State Route #99 Edmonds, Washington RN File No. 2587-001A April 23, 2010 Page 8 on -site soil, the import of clean. granular soil for fill, and the need to place a blanket of rock spalls in the access roads and paved areas prior to placing structural fill. Site Preparation and Grading The first step of site preparation should be to strip the vegetation, topsoil, or loose soils to expose medium dense or firmer native soils in pavement and building areas. 'The excavated material should be removed from the site, or stockpiled for later use as landscaping fill. The resulting subgrade should be compacted to a firm, non -yielding condition. Areas observed to pump or yield should be repaired prior to placing hard surfaces. The on -site glacial till likely to be exposed during construction is considered highly moisture sensitive' and the surface will disturb easily when wet. We expect these soils would be difficult, if not impossible, to compact to structural fill specifications in wet weather. We recommend that earthwork be conducted during the drier months. Additional expenses of Wet weather or winter construction could include extra excavation and use of imported fill or rock spalls. During wet weather, alternative site preparation methods may be necessary. These methods may include utilizing a smooth -bucket trackhoe to complete site stripping and diverting construction traffic around prepared subgrades. Disturbance to the prepared subgrade may be minimized by placing a blanket of rock spalls or imported sand and gravel in traffic and roadway areas. Cutoff drains or ditches can also be helpful in reducing grading costs during the wet seas on. These methods. ban be evaluated at the time of construction. Structural Fill General: All,fill placed beneath buildings, pavements or other settlement sensitive features should be placed as structural fill. 'Structural fill, by definition, is placed in accordance with prescrib ed methods and standards, and is observed by an experienced geotechnical professional . or soils technician. Field observation procedures would include the Robinson Noble, Inc Geotechnical Engineering Report O'Reilly Auto Part Store 23005 State Route #99 Edmonds, Washington RN File No. 2587-001A April 23, 2010. Page performance of a representative number of in -place density tests to document the attainment of the desired degree of relative compaction. Materials: Imported structural fill should consist of a good quality, free -draining granular soil, free of organics and other deleterious material, and be well graded to a maximum size of about 3 inches. Importedi all-weather structural fill should contain no more than 5 percent fi*nes (soil finer than a Standard U.S. No. 200 sieve), based on that fraction passing the U.S. 3/4-inch sieve. The use of on -site soil as structural fill will be dependent on moisture content control. Some drying of the native soils may be necessary in order to achieve compaction. During warm, sunny days this could be accomplished by spreading the material in thin lifts and compacting. Some aeration and/or addition of moisture may also. be necessary., We expect that compaction of the native soils to st ructural fill specifications Would be difficult, if not impossible, during wet weather. Fill Placement: Following subgrade preparation, placement of the structural fill may proceed. Fill should be placed in 8- to 10-inch-thick uniform lifts, and each lift should be spread evenly and be thoroughly compacted prior to placement of subsequent lifts. All structural -fill underlying building areas, and within a depth of 2 feet below pavement and sidewalk subgrade, should be compacted to at least 95 percent of its maximum dry density. Maximum dry density, in this report, refers to that density as determined by the ASTM D15.57 compaction test procedure. Fill more than 2 feet beneath sidewalks and pavement subgrades should be compacted to at least 90 percent of-the.maximum dry densit y.' The moisture content of the soil to be compacted should be within about 2 percent of optimum so that a read i ly, compactabl e condition exists. It may be necessary to overexcavate and remove wet surficial soils in cases where drying to a compactable condition is not feasible. Ail compaction should be accomplished by eqyipment of a type and size sufficient to attain the desired degree of compaction. Robinson Noble, Inc 0 . 0 Geotechnical Engineering Report O'Reilly Auto Part Store 23005 State Route #99 Edmonds, Washington, FIN File No. 2587-001A April 23, 2010 Page 10 Temporary and Permanent Slopes Temporary cut slope stability is a function of many factors, such as the type and consistency of soils, depth of the cut, surcharge loads adjacent to the excavation, length 'of time a cut remains open, and the presence of surface or groundwater. It is exceedingly difficult under these variable conditions to estimate a stable temporary cut slope geometry. Therefore,' it should be the responsibility of the contractor to maintain safe slope configurations, since the contractor is continuously at the job site, able to observe the nature and condition of the cut slopes, and able to monitor the subsurface materials and groundwater conditions encountered. For planning purposes, we recommend that temporary cuts made around the eastern perimeter of the planned building footprint be no steeper than 1.5 Horizontal to 1 Vertical (1.5H:1V). Cuts in the dense to very dense till may stand at a 0.75H:1V inclination or possibly steeper. If groundwater seepage is encountered, we would expect that flatter inclinations would be necessary. We recommend that cut slopes be protected from erosion. Measures taken may include covering cut slopes with plastic sheeting and diverting surface runoff away from the top of cut slopes. We recommend that cut slope heights and inclinations conform to local and WISHA/OSHA standards. Final slope inclinations for granular structural fill and the native soils should be no steeper than 2H:1V. Lightly compacted fills, common fills, or structural fill predominately consisting of fine grained soils should be no steeper than 3 H:1V. Common fills are defined - as fill material with some organics that are "trackrolled" into place. They would not meet the compaction specification of structural fill. . Final slopes should be vegetated and covered with straw or jute netting. - The vegetation should be maintained until it is established. Robinson Noble, Inc 0 0 Geotechnical Engineering Report O.'Reilly Auto Part Store 23005 State Route #99 Edmonds, Washington RN File No. 2587-001 A April 23, 2010 Page 11 Foundations Conventional shallow spread foundations should be founded on undisturbed till or structural fill extending down to the till. If the soil at the planned bottom of tooting elevation is not suitable, it should be overexcavated to expose suitable bearing soil. We recommend that the overexcavation be wider than the building footprint. The amount the overexcavation should be wider depends on the depth of the overexcavation. We recommend that the width from the outer edge of the footing be at least half of the depth of the overexcavation. For example, if 8 feet of soil needs to be removed beneath a footing to reach the dense native till, then the excavation should extend at least 4 feet beyond the outer edge of the footing. The overexcavation should then be backtilled with structural till as described in the above sections. Footings should extend at least 18 inches below the lowest adjacent finished ground surface for frost protection. Minimum foundation widths should conform to IBC requirements. Standing water should not be allowed to accumulate in footing trenches. All loose or disturbed soil should be removed from the foundation excavation prior to placing concrete. For foundations constructed as outlined above, we recommend an allowable design bearing pressure of 2,000 pounds per square foot (psf) be used for the footing design. IBC guidelines should be followed when consi , dering short-term transitory wind or seismic loads. Potential foundation settlement using the recommended allowable bearing pressure is estimated to be less than 1-inch total and 1/2-inch differential between footings or across a distance of about 20 feet. It is important to compact the structural fill within the building area to above project specifications to -reduce differential settlement across the building. The above foundations may be resisted by friction at the base of the wall and passive resistance against the foundation. A coefficient of friction of 0.5 may be used- to determine the base friction in the *native glacial soils. An equivalent fluid density of 250 pcf -may be used for passive resistance design. To achieve this value of passive pressure, Robinson Noble, Inc 0 0 Geotechnical Engineering Report O'Reilly Auto Part Store 23005 State Route #99 Edmonds, Washington FIN File No. 2587-001A April 23, 2010 Page 12 the foundations should be poured "neat" against the native dense soils, or compacted fill - should be used as backfill against the front of the footing, and the soil in front of the wall should extend a horizontal distance at least equal to three times the foundation depth. A factor of safety of 2.0 has been applied to the passive pressure to account for required movements to gene rate these 'pressures. The friction coefficient does not include a factor of safety. Slabs -On -Grade Slab -on -grade areas should be prepared as recommended in the Site Preparation and Grading subsection. Slabs should be supported on medium dense or firmer native soils, or on structural fill extending to these soils. Where moisture control is a concern, we recommend that slabs be underlain by 6 inches of pea gravel for use as a capillary break. A suitable vapor barrier, such as heavy plastic sheeting, should be placed over the capillary break. An additional 2-inch-thick damp sand blanket can be used to cover the vapor barrier to protect the membrane and to aid in curing the concrete. This will also help prevent cement paste bleeding down into the capillary break through joints or tears in the vapor barrier. The capillary break material should be connected to the footing drains to provide positive drainage. Drainage We recommend that runoff from impervious surfaces, such as roofs, driveway and access roadways, be collected and routed to* an appropriate storm water discharge system. The finished ground surface should be sloped at a gradient of 5 percent minimum for a distance of at least 10 feet away from the buildings, or -to an.approved method of diverting water from the foundation per IBC Section 1803.3. Surface water should be collected by permane nt catch basins and drain lines, and be discharged into a storm drain system. We recommend that footing drains be used around all of the structures where moisture control is important. It is good practice to use footing drains installed at le ast 1 foot below the planned finished floor slab to provide drainage. Footing drains should discharge into tightlines leading Robinson. Noble, Inc 0 .0 Geotechnical Engineering Report O'Reilly Auto Part Store 23005 State Route #99 Edmonds, Washington RN File No. 2587-001A April 23; 2010 Page 13 to an appropriate collection and discharge point. For slabs -on -grade, a drainage path should be provided from the capillary break material to the footing drain system. Roof drains should not be connected to wall or footing drains. Our experience with gently -sloping till sites is that the volume. of water collected by commercial building foundation drains and routed to the stormwater detention system is insignificant when considered in the storm drainage design. We do not, expect that the foundation drain water will impact the design of the stormwater detention system. Utilities Our explorations indicate that deep dewatering will not be needed to install standard depth utilities. Anticipated groundwater is expected to be handled with pumps in the trenches. We also expect that some groundwater seepage may develop during and following the wetter times of the year. We expect this seepage to mostly occur in pockets. We do not expect significant volumes of water in these excavations. The soils likely to_ be exposed in utility trenches after site stripping are considered highly moisture sensitive. We recommend that they be considered for trench backfill during the drier portions of the year, provided these soils are within 2 percent of their optimum moisture content and are suitable to meet compaction specifications. During the wet seaso n, it may be difficult to achieve compaction specifications; therefore, soil amendment with kiln dust or cement may be needed to achieve proper compaction with the on -site materials. The amount of organics encountered will also determine if onsite soil can be used or if imported materials are needed. Additional overexcavation may be needed in areas to confirm the utilities are supported on native bearing soil or structural fill extending to these soils. Pavement Subgrade The performance of roadway pavement is critically related to the conditions of the underlying subgrade. We recommend that the subgrade soils within the roadways be Robinson Noble, Inc Geotechnical Engineering Report O'Reilly Auto Part Store 23005 State Route #99 Edmonds, Washington RN File No. 2587-001A April 23, 2010 Page 14 prepared as described in the Site Preparation and Grading subsection of this report. Prior to placing base material, the subgrade soils should be compacted to a non -yielding state with a vibratory roller comp actor and then pro -of -rolled with a piece of heavy c6nstruction equipment, such as a fully -loaded dump truck. Any areas with excessive weaving or flex ing should be overexcavated and recompacted or replaced with a structural fill or crushed rock placed and compacted in acco rdance with recommendations provided in the Structural Fill subsection of this repbrt. An alternative to complete removal of all the existing fill would be to remove the upper 2 feet in the pavement areas and compact the existing surface. If the existing fill can be compacted to a dense state, then 2 feet of granular import could be placed for the pavement section. If this method is used, there is some additional risk of settlement in the pavement area. Additional maintenance would be expected. The amount of fill removed and the degree of compaction will reduce the risks. CONSTRUCTION OBSERVATION We should be retained to provide observation and consultation services during construction to confirm that the conditions encountered are consistent with those indicated by the explorations, and to provide recommendations for design changes, should the conditions revealed during the work differ from those anticipated. As part of our services, we would also evaluate whether or not earthwork and foundation installation activities comply with contract plans and specifications. USE OF THIS REPORT We have prepared this report for O'Reilly Auto Parts and its agents, for use in planning and design of this project. The data and report should be provided to prospective contractors for their bidding and estimating purposes, but our report, conclusions and interpretations should not be construed as a warranty of subsurface conditions. Robinson Noble, Inc Geotechnical Engineering Report O'Reilly Auto Part Store 23005 State Route #99 Edmonds, Washington FIN File No. 2587-001A April 23, 2010 Page 15 The scope of our services does not include services related to construction safety precautions, and our recommendations are not intended to direct the contractors' methods, techniques, sequences or procedures, except as specifically described in our report, for consideration in design. There are possible variations in subsurface conditions. We recommend that project planning include contingencies in budget and schedule, should areas be found with conditions that vary from those described in this report. Within the limitations of scope, schedule and budget for our services, we have strived to take care that our services have been completed in accordance with generally accepted practices followed in this area at the time this report was prepared. No other conditions, expressed or implied, should be understood. Robinson Noble, Inc Geotechnical Engineering Report O'Reilly Auto Part Store 23005 State Route #99 Edmonds, Washington RN File No. 2587-001A April 23, 2010 Page 16 We appreciate the opportunity to be of service to you. If there are any questions concerning this report or if we can:provide additional services, please. call. Sincerely, kobinson Noble, Inc. Kevin Boekholt, EIT Project Engineer 3 5 Rick B. Powell, PE Principal Engineer KWB:RBP:am Three Copies Submitted Nine Figures Information about this Geotechnical Engineering Report cc: Dale M. Allison, ATC - Director, National CI I ient Management Robinson Noble, Inc Vicinity Map N g=-i CL 9 221ST 220TH I PL i�� S.T, ;�J < 222N 221ST A - siq S 22N6 Sw > 3: PL Sw. ST S14: 2221VO `J*K LOk I P ARK CN C=) CD 223RD �k 7 to PL SW 79 222110 224TH X!..2m ST SW 225TH ST, 225TH Sw, PL SW -J R Co CN ?28TH ST W - is 7700 -- 1 740�------ :-:j�2PIH ST =t SW 230 H__ Project 1�w S -232ND--ST' Sw 2�33RD L Sw 224TH 'I MOrT S 0010 Z, IST SW 'N si, �'z .. - - - 1 223RD pL SW cot I ro P L SO :> ST 26TH ST 22-ITH PL Sw 225TH -PL _ S�4 :qV 4 < ? Z pi, 22,7;, 267 L2 H- 'ST SW PL 22 8TH �J227TH Sw ST ST SW _.S 2 9ATW E3 I -J PAffi 229TH ------ T­ 7 & %r -J 230T/I '9 0- C) P Sw �E > < C-, 230TH ST M Sid OTH S T <)3 M �w M, I n". F— I ! 3 St iE I =: F— ST 232ND ST SW! IST wo , 9 :-.1 1 232Nb 01US PL Sw 45RI) S� S� 232hD Pl. --C SWL].,C 1 13.- po 4LUNGER 02005 Thomas Bros Maps 233RD Address: 23005 SR 99, Edmonds, WA ROBINSON' 17625-1.30th Ave NE, 0-102 - Phone: (425) 488-0599 O'Reilly Auto Pjarts Fax: (425) 488-2330 File Number Figure bodinville, WA - 98072 1 2587-001 A 1 1 Site Plan LEGEND. B-1 Number and Approximate Location of Soil Boring 1 0 0 50 100 Scale 1" = 50' Reference: Based on site plan provided by O'Reilly Auto Parts, dated 03-04-2010 Phone: (425)488-0599 O'Reilly Auto Parts - 23005 SR99. Edmonds, WA Fax: (425) 488-2330 FROBINSON File Number 2587-001A Figure 2 NOBLE 17625-130th Ave NE, C-1 02 - Woodinville, WA - 98072 1 1 1 F_ -I Ah UNIFIED SOIL CLASSIFICATION SYSTEM MAJOR DIVISIONS GROUP SYMBOL GROUPNAME GRAVEL GW WELL -GRADED GRAVEL, FINE TO COARSE GRAVEL COARSE- CLEAN GRAVEL GP POORLY -GRADED GRAVEL GRAINED SOILS MORE THAN 50% OF COARSE FRACTION RETAINED ON NO. 4 SIEVE GRAVEL WITH FINES GM S I LTY GRAV E L GC CLAYEY GRAVEL SAND CLEAN SAND SW WELL -GRADED SAND, FINE TO COARSE SAND SP POORLY -GRADED SAND MORE THAN 50% RETAINED ON NO. 200 SIEVE MORE THAN 50% OF COARSE FRACTION PASSES NO. 4 SIEVE SAND WITH rINES SM SILTY SAND SC CLAYEY SAND FINE - SILTAND CLAY INORGANIC ML SILT CIL CLAY GRAINED SOILS LIQUID LIMIT LESS THAN 50% ORGANIC CIL ORGANIC SILT, ORGANIC CLAY SILTAND CLAY INORGANIC MH SILT OF HIGH PLASTICITY, ELASTIC SILT CH CLAY OF HIGH PLASTICITY, FAT CLAY MORE THAN 50% PASSES NO. 200 SIEVEI LIQUID LIMIT 50% OR MORE — ORGANIC OH ORGANIC CLAY, ORGANIC SILT HIGHLY ORGANIC SOILS PT PEAT NOTES: SOIL MOISTURE MODIFIERS 1) Field classification is based on visual examination of soil in general Dry- Absence of moisture, dusty, dry to the touch accordance with ASTM D 2488-93. 2) Soil classification using laboratory Moist- Damp, but no visible water tests is based on ASTM D 2487-93. Wet- Visible free water or saturated, 3) Descriptions of soil density or consistency are based on usually soil is obtained from below water table interpretation of blowcount data, visual appearance, of soils, and/or test data. Modifications have been applied to ASTM methods to describe sit and clay content. KEY TO BORING LOG SYMBOLS — Letter symbol for soil type Contact between soil strata IMML — (Dashed line indicates approximate contact between soils) Ground water level — Letter symbol for soil type 0 Blows required to drive sample 12 In. using SPT a (Weight of water) MC(M)=%MOlstur =(weight of dry soil) DD Dry Density NOTE: The. stratification lines represent the approximate boundaries between soil types and the transition -may be gradual Phone: (425) 488-0599 Fax: (425) 488-2330 Soil Classification and Boring Log Key FROBINSON' NOBLE 17625-130th Ave NE, Suite 102 - Woodinville, WA- 98072 Figure 3 Date 4/12/2010 Hol' meter 8" B-1 Logged by KWB Hole?epth 15' Driller Holocene Well diameter N/A Page 1 of 1 Elevation Well depth N/A LITHOLOGY / DESCRIPTION (j (6 zi Sample ?1 0) > 0 U W Static Water Level (D a -W tandard Penetration Resistance (140 lb. weight, 30" drop) Blows per foot Moisture Content 0 10 20 30 40 50 50+ BARK and WOOD CHIPS (FILL) ............. ..................... ........ ................................................ ......................... Brown fine to coarse SAND with gravel (LILL) AF ................. SW 2 3— 4— 5 — 6- 7— 8— 9— 10— 12- 13— 14— 16- 17- 18- 19— 20 . 21- 22- 23- 24— 25 67% U -------- - --------------------- ----------------------- ---------- ---------------- ------------------------------- --------- --------------------- ------------------------------- ------------------ --------- ---------- -------- ............. ----------------------------------------------- -------- Dark brown to black SILTY fine to coarse SAND with organics and gravel (Loose, Moist) (FILL) Brown fine to coarse SAND with silty clay and gravel (Loose. Moist) (LILL) SM SW-SC.''r, Dense GRAVEL encountered Brown SILTY fine to coarse. SAND with gravel (Dense, Moist) (TILL) SM TA15— Boring 2 complete at'l 5 feet on 4/12/2010 Groundwater seepage was not encountered Phone: (425) 488-0599 Fax: (425) 48 8-23.30 ROBINSON" NOBLE 17625-130 Ave NE, Suite 162 - Woodinville, WA - 98032 O'Reilly Auto Parts - 23005 SR99.Edmonds., WA File.Number 2587-001A igure 4 Date 4/12/2010 Hol ele, 8" 4 e B-2 Logged by KW13 Holetepth 15, Driller Holocene Well diameter NIA Page I of 1 Elevation Well depth N/A LITHOLOGY / DESCRIPTION C6 =i Sample ?_1 00) 0 Static Water Level qr andard Penetration Resistance (140 lb. weight, 30" drop) 0 Blows per foot M Moisture Content 0 iO 20 30 40 50 50+ BARK and WOOD CHIPS (FILL) .......................... ................................................................................. ........ Dark brown to black ORGANIC SILT with wood debris and fine to medium sand (Soft, Wet) (fILL) ............. ............ ......................................... ........ ................................. Gary SILTY fine SAND with organics and silt (Medium Dense, Moist) (FILL) AF ..... ...... OL ............ SM 2— 3— 4— 5— 6- 7— 9— 10— 12- 13— 14— 15— 16- 17- 18- 19— 20- 21- 22- 23- 24— 25— 93 --------- -------------------- -------- ------ ...... ------------- ----------------- ------------------- ................................................ ----------------------------- ----------------------------- ------------------------------- ------------- --------- Dense GRAVEL encountered Gray SILTY -fine to medium SAND with gravel (Very Dense, Moist) (TILL) SM Boring 2 complete at 15 feet on 4/12/2010 Slight groundwater seepage near 13 feet Phone: (425) 488-0599 Fax: (42 5)488-2330 ROBINSON- NOBLE 17625-130 AveNE, Suite 102 - Woodinville, WA - 98032 .L- O'Reilly Auto Parts - 23 005 SR99 Edmonds., WA File Number 2587-001 A Ef - 5 Date 4/12/2010 Holometer 8" B-3 Logged by KWB Hole depth 15' Driller Holocene Well diameter N/A Page 1 of I Elevation Well depth �N/A LITHOLOGY / DESCRIPTION U5 3 Sarn�ie -a 0 0 .2 W C Static water Level w !� cl- a) 0 tandard Penetration Resistance (140 lb. weight, 30" drop) * Blows per foot 0 Moistu re Content 0 10 20 30 40 50 50+ CRUSH ROCK (Medium Dense, Moist) (FILL) .................................................................................................................. Brown SILTY fine to coarse SAND with pulverized gravel (Very Dense, Moist) (TILL) Gray SILTY fine to coarse SAND with gravel (Very Dense, Moist) (TILL) Gray SILTY,fine to coarse SAND with gravel (Very Dense, Moist) (TILL) GW SM SM SM 2— 3— 4- 5— 6- 7— 8— 9- 10— 12- 13— 14— 15 . 16- 17- 18- 19— 20— 21- 22- 23- 24- 25— --------- ---------------------------------------- - : --------- 13 92 --------- -------------------- ------------------------------ 13 :510 . ......... ----------------------------------- -------------- ----------------------- --------- ------ --------- ---------- ...... Boring 3 complete at 15 feet on 4/12/2010 Groundwater seepage was not encountered Phone: (425) 488-0599 Fax: (425) 488-2330 ROBINSON' NOBLE 17625-130 Ave NE, Suite 102 - Woodinville, WA - 980,32 O'Reilly Auto Parts - 23005 SR99 Edmonds, WA F He Number 2587-001 A lFigure 6 Date 4/12/2010 Hol 'neter 8" B-4 Logged by KWB Ole e th 15, H A p Driller Holocene Well diameter NA Page 1 of 1 Elevation Well depth N/A LITHOLOGY I DESCRIPTION 6 6' Sample Static Water Level CD IR _c CL CD Wandard Penetration Resistance (140 lb. weight, 30" drop) Blows per foot m Moisture Content 0 10 2b 30 40 50 �50+ WOOD CHIPS (From 0.0 to 2.7 foot depth) AF AF 2— 3— 4- 5— .6- 7� 8— 9- 10 — 12- 13— 14— 15— 16- 17- 19— 20- 21- 22- 23� 24 25— ---------- m --------- ------------ ------- ----- ---- --------- 88 -------------------- ------------------- -------------------- 574 -------------------- -- �' ---------- --------- ---------- ----------------- -------------------- I ---------- ---------- a .......... ------------ ----------- ------ Gray SILTY fine to coarse SAND with gravel (Dense, Moist) (TILL) Gray SILTY fine to coarse SAND With gravel (Very, Dense, Moist) (TILL) Gray SILTY fine to coarse SAND with gravel (Very Dense, Moist) (TILL) sT SM SM Boring 4 complete at 1.5 feet on 4/12/2010 Groundwater seepage was not encountered Phone: (425) 488-0599 Fax: (425) 488-2330 ROBINSON NOB LE . 17625-130 Ave NE, Suite 102 - Woodinville, WA - 98032 O'Reilly Auto Parts - 23005 SR99 Edmonds, WA File Number 2587-001A lFigure 7 0 Grain Size Analysis U.S. Standard Sieve Opening in Inches U.S. Standard Sieve Numbers Hydrometer Results 100% 20 6 4 3 1% % A % #4 10 16 20 30 40 50 100 200 0% 442,4- 4 - -7 90% --- T ------....... ...... ----------- I r r I ------------ ------- - ---- -- ----------- - - ----------------- 11T,77 ------------------- ----------- ------- 10% 80% - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 4 - - - - - - - - - - - . . . . . . . . . . . . . . ----- 20% 70% ..................... - - - - - - - - - - - . . . . . . . . . . . . . - - - - - - - - --- - - - - - - - - - - - - - - - - - - - - - __T__ rT­ - - - - - - - - r . . . . . . . . . . ..... T . . . . . . . . ... . . r . . . . . . . . . . ... . . - - - - - - I - - - - - - I I T 7 7 . . . I . . ................... ... --------- 30% .2) --------­---------- ----­-------------- --- ­­­-77 ................. i5a) 60% 7: 1: 'r - - - T: r I r - - - -- - - - - . . . . . . . L - - - 1- - - - - - - ----- I - T I I - - - - - - - ------- 40% . ... . ... . . . . . . . . . . . . 7 1 T -r 7 7 - - - - - - - - - - - - - - - -- - - - - - - - - -- - - - - - -- - - --- - - - - - - - - - - -- 7- --- T - -- --- - -- - - - - - - --- - - - - - - 50% - - - - - - - - - - - - - - - - -- - - - - - - - - - - --------- ---------- 7 7 r -7 ------ __: -------- --- ---- ---- ----------- 50% U) r -- - -- - - - - 40% 4 J __: ----------- ------------- - - --- - - - - - - - - - - - - - - - - - - - - - -- J - - - L - J - - - - - - - - - - I - - - - - - - - - -- . . ....... ... 60% . . . . . . . . ... . ... .. . . . . . . . . . . . . . - - - - - - . . . . . . . . . . . . . . . - - - - - - - 7 M 30% L ... I ................... .. .......... -------- ------- - - - - ------- ------- 70% 20% ------ ----------- ------ I -- ------ ----- --- ------- 80% 10% ------------- -------- 7 - - - - - - - - - - - - - - ----------- ...... I ----------- -------------- ........ ------- ------------- ------- ------ -------------- 90% 0% 100% 1000 100 10 1 0.1 0.01 0.001 'Grain Size in Millimeters Gravels Sands Cobbles Silts Clays Coarse Fine Co. Medium -7 Fine Date: 04/20/10 D1() = 0.07 USCS Classification % Gravel % Sand Sample #: D30 = 0.28 SW -SC, Well -graded Sand wi 15.8% 73.5% Sample ID: Suitable Fill D60 = 0.80 Specifications Source: Cc = 1.35 No Specs Project: NUD Cu- 11.45 Sample Meets Specs % Silt & Clay Location: Liquid Limit-- n/a No 10.7% Boring #: B-f Plastic Limit-- n/a Fineness Modulus Depth: 8.25 Plasticity Index= n/a 2.80 Coarse Actual Interpolated Fines Actual Interpolated Section Cumulative Cumulative Section Cumulative Cumulative Sieve Size Percent Pe t Specs Specs Sieve Size Percent Percent Specs Specs us Metric Passing Pascsinng Max Min us Metric Passing Passing Max Min 6.00" 150.00 100.0% #4 4.750 84.2% 84.2% 4.00" 100.00 100.0% #8 2.360 72.7% 3.00" 75.00 100.0% #10 2.000 70.9% 70.9% 2.50" 63.00 100.0% #16 1.180 64.2% 2.00" 50.00 100.0% #20 0.850 61.5% 61.5% 1.75" 45.00 100.0% #30 0.600 53.2% 1.50" 37.50 100.0% #40 0.425 47.4% 47.4% 1.25" 31.50 100.0% #50, 0.300 32.8% 1.001, 25.00 100.0% #60 0.250 26.9% 26.9% 7/8" 22.40 100.0% #80 0.180 20.6% 3/4" 19.00 100.0% #100 0.150 17.9% 17.9% 5/8" 16.00 100.0% #140 0.106 13.7% 1/2" 12.50 98.7% 98.7% #170 0.090 12.1% 3/8" 9.50 94.9% 94.9% #200 0.075 10.7% 10.7% 1/4" 6.30 87.7% #270 0.053 #4 4.75 84.2% 84.2% I I I Copyright I Spems Engineering & Technical Services PS, 1996-2005 17625 - 130th Ave NE, Suite 102 18019 25th Ave NE Robinson Noble, Inc. Woodinville WA, 98072 Figure 8 Grain Size Analysis U.S. Standard Sieve Opening in Inches U.S. Standard Sieve Numbers Hydrometer Results 100% 90% 80% :E 70% 60% 0) 50% 40% (L 30% 20% 10% 0% 0% 10% 20% 30% 40% 50% 60% ID 70% 80% 90% 100% 1000 100 10 1 0.1 0.01 0.001 r,rAn',;i7A in Millimptprs ... Zu 4 J 17. 7. 7. 7. *4 lu ]b Zu qu ou 1UU ZUU 7 - - -- - - - - - - - 7- T - - - - - - . . . . . . . . . . . I,- T, - - - - - - - ----- - - - - - - 1, . . . . . . --T - - - - - - - - - - . . . . . . . . . . . . . . . . r-T - - - - - - - r - - - - - - - - - - - - - - - - . . . . . . . . . . . . . r ------------------- .......... * ---- ------ - --- ------ : . . . . . ; . . . . ; I --- I. -I -------- 11T., 7 -------------------------- 1,777, r , - - - - - - - - - - - - - T T-1- -1 - - - - - - - - - - - - - --T ------------------------- - - - - - - - - - - -- - - - - - - --- - - - -- - - - - - - - - - ---------------- ------ -------- ---------- - ---- ------------------- T r - - - T . . . . . . . . . . . . . . . - - - - - - - r. T- 4 ------------- ------- --------------------------------- -------- ----- --------------------- - ---------------------------------- -T - -- - - -- - - - - - - - - - - - -- -- - - - - - - - -- - - - - - - - - - - - - --- . . . . . . . --4 - - ---- -- - - --- -- - - - - - - - -- - - - - -- - - - - - - ------- - i --- - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - -- -- --- - - - - - - - - - - - - - - - - - --- -- - - - - - - - - 7 - - -- - - -- - - - - - - - - - - - - - --- - - - - - -- - - - - - - - - - - - - - -- -- - - - - - - - - - - - - - - - - - -- - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - --- - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - j. . . . . . .. - - - - - - . . . . . . . . . . 11-- - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - X, * - - - - - -- - - - - - - - - - - --- . . . . . . . . . . . .. . - - - - - - - - - - - - - - * . . . . . . . . . - - - --- - - - - - - - - - - - - - - - - - - - - - - - - - - t - - - - - - - - - - - - - - - - - - - - - I I - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ---------- -1 - - - - - - - - - - - - - - - - - . . . . . - - - - - - - - - - Cobbles Gravels Sands Silts Clays Coarse I Fine Co. I Medi.,-T Fine Date : 04/20/10 Sample #: Sample ID: TILL Source: Project: O'Reilly Auto Location: Boring #: B-4 Depth: 14.25 feet D10 = 0.04 D30 = 0.21 D60 = 1.26 Cc= 0.79 C,- 29.67 Liquid Limit- n/a Plastic Limit-- n/a Plasticity Index= n/a USCS Classification SM, Silty Sand with Grav Specillcations No Specs Sample Meets Specs No Fineness Modulus 2.96 % Gravel 23.1% % Silt & Clay 17.6% % Sand 59.3% Coarse Actual Interpolated Fines Actual Interpolated Section Cumulative Cumulative Section Cumulative Cumulative Sieve Size Percent Percent Specs Specs Sieve Size Percent Percent Specs Specs us Me7t�il Passing Passing Max Min US Metric Passing Passing Max Min 6.00" 150.00 100.0% #4 4.750 76.9% 76.9% 4.00" 100.00 100.0% #8 2.360 - 67.1% 3.00" 75.00 100.0% #10 2.000 65.7% 65.7% 2.50" 63.00 100.0% #16 1.180 59.4% 2.00" 50.00 100.0% #20 0.850 56.8% 56.8% 1.75" 45.00 100.0% #30 0.600 50.6% 1.501, 37.50 100.0% .#40 0.425 46.2% 46.2% 1.25" 31.50 100.0% #50 0.300 37.1%- 1.001, 25.00 100.0% #60 0.250 33.4% 33.4% 7/8" 22.40 100.0% #80 0.180 27.9% 3/4" 19.00 100.0% #100 0.150 25.5% 25.5% 5/8" 16.00 100.0% #140 0.106 .20.9% 1/2" 12.50 92.4% 92.4% # 1170 0.090 19.2% 3/8" 9.50 87.5% 87.5% #200 0.075 17.6% 17.6% 1/4" 6.30 80.4% #270 0.053 #4 4.75 76.9% 76.9% - I I I CopyrightlSpeam Engineering & Technical Savices PS, 1996-2005 17625 - 130th Ave NE, Suite 102 18019 25th Ave NE Robinson Noble, Inc. Woodinville WA, 98072 Figure 9 0 0 Geolec"hoical En ROPOPI., I 01fleepin-0 Geotechnical Services Ape Performed fop Specific Purposes, Persons, and Projects Geotechnical engineers structure their services to meet the specific needs of their clients. A geotechnical engineering study conducted for a civil engi- neer may not fulfill the needs of a construction contractor or even another civil engineer. Because each geotechnical engineering study is unique, each geotechnical engineering report is unique, prepared solelyfor the client. No one except you should rely on your geotechnical engineering report without first conferring with the geotechnical engineer who prepared it. And no one — not even you — should apply the report for any purpose or project except the one originally contemplated. Read the Full Report Serious problems have occurred because those relying on a geotechnical engineering report did not read it all. Do not rely on an executive summary. Do not read selected elements only. A Geotechnical Engineering Report Is Based on A Unique Set of Ppoiect-Specific Factors Geolechnical engineers consider a number of unique, project -specific fac- tors when establishing the scope of a study. Typical factors include: the client's goals, objectives, and risk management preferences; the general nature of the structure involved, its size, and configuration; the location of the structure on the site; and other planned or existing site improvements, such as access roads, parking lots, and underground utilitim Unless the geotechnical engineer who conducted the study specifically indicates oth- erwise, do not rely on a geotechnical engineering report that was: not prepared for you, not prepared for your project, - not prepared for the specific site explored, or completed before important project changes were made. Typical changes that can erode the reliability of an existing geotechnical engineering report include those that affect: . the function of the proposed structure, as when it's changed from a parking garage to an office building, or from a light industrial plant to a refrigerated warehouse, elevation,'configuration, location, orientation, or weight of the proposed structure, composition of the design team, or - project ownership. As a general rule, always inform your geotechnical engineer of project changes —even minor ones —and . request an assessment of their impact. Geolechnical engineers cannot accept responsibility or liability for problems that occur because their reports do not consider developments of which they were not informed. Subsurface Conditions Can Change A geotechnical engineering report is based on conditions that existed at the time the study was performed. Do not rely on a g6olechnical engineer- ing reportwhose adequacy may have been affected by: the passage of time; by man-made. events, such as construction on or adjacent to the site; or by natural eventsi such as floods, earthquakes, or, g roundwater f luctua� tions. Always contact the geotechnical engineer before applying the report to determine if it is still reliable. A minor amount of additional testing or analysis could prevent major problems. Most Geotechnical Findings Ape Professional Opinions Site exploration identifies subsurface conditions only at those points where subsurface tests are conducted or samples are taken. Geotechnical engi- neers review field and laboratory data and then apply their professional judgment to render an opinion about subsurface conditions throughout the site. Actual subsurface conditions may differ —sometimes significantly — from those indicated in your report. Betaining the geotechnical engineer who developed your report to provide consttuction observation is the most effective method of managing the risks associated with unanticipated conditions. A Report's. Reco.mmendations* Ape NotfinaL Do not overrely on the construction recommendations included in yow report. Those recommendations are not final, because geotechnical engi- neers develop them principally from judgment and opinion. Geotechnical engineers can finalize their recommendations only by observing actual subsurface conditions revealed during construction. The geolechnical engineer who developed your report cannot assume responsibility or liability for the report's recommendations if that engineer does not perform construction observation. A Geotechnical Engineeping Repopt Is Subject to Misintepppetation Other design team members' misinterpretation of geotechnical engineering reports has resulted in costly problems. Lower that risk by having your geo- technical engineer confer with appropriate members of the design team after submitting the report. Also retain your geotechnical engineer to review perti- nent elements of the design team's plans and specifications, Contractors can also misinterpret a geotechnical engineering report. Reduce that risk by having your geotechnical engineer participate in prebid and preconstruction conferences, and by providing construction observation. Do Not Redpaw the Engineep's Lous Geotechnical engineers prepare final boring and testing logs based upon their interpretation of field logs and laboratory data. To prevent errors or omissions, the logs included in a geotechnical engineering report should never be redrawn for inclusion in architectural or other design drawings. Only photographic or electronic reproduction is acceptable, but recognize that separating logs from the report can elevate risk Give Contpactops a Complete Repopt and Guidance Some owners and design professionals mistakenly believe they can make contractors liable for unanticipated subsurface conditions by limiting what they provide for bid preparation. To help prevent costly problems, give con- tractors the complete geotechnical engineering report, but preface it with a clearly written letter of transmittal. In that letter, advise contracto ' rs that the report was not prepared for purposes of bid development and that the report's accuracy is limited; encourage them to confer with the geotechnical engineer who prepared the report (a modest fee may be required) and/or to conduct additional study to obtain the spe cific types of information they need or prefer. A prebid conference can also be valuable. Be sure contrac- tors have sufficient time to perform additional study. Only then might you be in a position to give contractors the best information available to you, while requiring them to at least share some of the financial responsibilities stemming from unanticipated conditions. Read Responsibility Ppovisions Closely Some clients, de ' sign professionals, and contractors do not recognize that geolechnical engineering is far less exact than other engineering diSCi7 plines. This lack of understanding has created unrealistic expectations that have led to disappointments, claims, and disputes. To help reduce the risk of such outcomes, geotechnical engineers commonly include a variety of explanatory provisions in their reports. Sometimes labeled "limitations' many of these provisions indicate where geotechnical engineers' responsi- bilities begin and end, to help others, recognize their own responsibilities and risks. Read these provision's closely. Ask questions. Your geotechnical engineer should respond fully and frankly. Geoenuiponmental Concepns Ape Not Coveped The equipment, techniques, and personnel used to pMorrn a geoenviron- mental study differ significantly from those used to perform a geotechnical study. For that reason, a geotechnical engineering report does not usually relate any geoenvironmental findings, conclusions, or recommendations; e.g., about the likelihood of encountering underground storage tanks or regulated contaminants. Unanticipated environmentalproblems have led to numerous project failures. If you have not yet obtained your own geoen- vironmental information, ask your geolechnical consultant for risk man- agem ent g u i dan ce. Do not rely- on an en vironmental repof t prepared for someone else. Obtain Pitofessional Assistance To Deal with Mold Diverse strategies can be applied during building design, construction, operation, and maintenance to prevent significant amounts of mold from growing on indoor surfaces. To be effective, all such strategies should be devised for the express purpose of mold prevention, integrated into a com- prehensive plan, and executed with diligent oversight by a profess ' ional mold prevention consultant. Because just a small amount of water or moisture can lead to the development of severe mold infestations, a num- ber of mold prevention strategies focus on keeping building surfaces dry. While groundwater, water infiltration, and similar issues may have been addressed as part of the geotechnical engineering study whose findings are conveyed in this report, the geotechnical engineer in charge of this project is not a mold prevention consultant; none of the services per- formed in connection with the geotechnical eqgineer's study were designed or conducted for the purpose of mold preven- tion. Proper implementation of the recommendations Conveyed in this report will not of itself he sufficient to prevent mold from growing in or on the structure involved. Rely, on Youp ASFE-Membep Geotechncial Engineep fop Additional Assistance - Membership in ASFE/The Best People on Earth exposes geotechnical engineers to a wide array of risk management techniquos that can be of genuine benefit for everyone involved with a construction project. Confer with you ASFE-member geotechnical engineer for more information. ASFE The BeSl People an Earth 8811 Colesville Road/Suite G106, Silver Spring, -MD 20910 Telephone: 301/565-2733 Facsimile: 301/589-2017 e-mail: info@asfe.ofg www.asfe.org - �opydght2004 by ASFE, Inc. Duplication, reproduction, or copying of this document, in whole or In part, by any means whatsoever, is strictly prohibited, except with ASFE's specific written permission. Excerpting, quoting, or otherwise extracting wording from this'document is permitted only with the express written permission ofASFE, and only for purposes of scholarly research or book review. Only members of ASFE may use this document as a complement to or as an element of a geot6chfiical engineering report. Any other firm, Individual, or other entity that so uses this document without being an ASFE member could be committing negligent or Intentional (fraudulent) misrepresentation. 11GER06045.0M 0 City of Edmonds Development Services Department Planning Division Phone: 425.771.0220 Fax: 425.771.0221 Critical Areas File #: 7ZIM — (,'z,, Critical Areas Checklist Fee: $45.00 Date Received by Dev. Serv. Dept�_� I S_ 2LX0 City Receipt No: 10 B r, 151, Date Mailed to Applicant:- -4 - I CRITICAL AREAS CHECKLIST The Critical Areas Checklist contained on this form is to be filled out by , any person preparing a Development Permit Application for the City of Edmonds Prior to his/her submittal of a development permit to the City. The purpose of the Checklist is to enable City staff to determine whether any potential Critical Areas are, or may be, present on the subject property. The information needed to complete the Checklist should be easily available from observations of the site or data available at City Hall (Critical areas inventories, maps, or soil surveys). An applicant, or his/her representative, must fill out the checklist, sign and date it, and -submit it to the City. The City will review the checklist, make a precursory site visit, and make a determination of the subsequent steps necessary to complete a development permit application. Please submit a vicinity map, along with the signed copy of this form to assist City staff in finding and locating the! specific piece of property described on this form. In addition, the applicant shall include other pertinent information (e.g., site plan, topography map, etc.) or studies in conjunction with this Checklist to assist staff in completing their preliminary assessment of the site. I have completed the attached Critical Areas Checklist and attest that the answers provided are factual, to the best of my knowledge (fill out the appropriate column below). PLEASE PRINT CLEARLY I Owner/Applicant: Q VA li-fe, e, WA Name ;i�a Street Address City Stite Zip Telephone Signature Da4e Applicant Representative: Name Street Address city State zip Telephone Signature Date d:recsptiortqana/CACLHandout.doe Revised 411 OrM CA CAcal Areas Checklist' FONO ---------------- ------------------------- - - - - - - - - - - - - - Site Information (soil s/topography/hydrology/vegetation) I . Site AddressALocation: 2. Property Tax Accounfl� 3. Approximate Site Size (acres or square feet): 4. Is this site currently developed? X yes; no. If yes; how is site developed?— A � Y& SA 5. Describe the general site topography. Check all that apply. Flat: less than 5-feet elevation change over entire site. Rolling: slopes on site generally less than 15% (a vertical rise of I 0-feet over a horizontal distance of 66-feet). Hilly: slopes present on site of more than 15% and less than 30% ( a vertical rise of 10-feet over a horizontal distance of 33 to 66-feet). Steep: grades of greater than 3 0% present on site (a vertical rise of I 0-feet over a horizontal distance of less than 33-feet). Other (please describe): 6. Site contains areas of year-round standing water: Approx. Depth: 7. Site contains areas of seasonal standing water: Approx. Depth: Whit season(s) of the year? 8. Site is in the floodway floodplain of a water course. 9. Site contains a creek or an area where water flows across the grounds surface? Flows are year- round? Flows are seasonal? (What time of year? 10. Site is primarily: forested meadow ;shrubs mixed urban landscaped (lawn,shrubs etc) 11. Obvious wetland is present on site: SCS M" 4, 114-y- appe. tAq*JoYe;.i�9ry..-..9T*. p.T.ppa 'a Wi] ifiye .. .... .. Critica:Ar�as or. ln� .10 ..Oa jiti, al A-'r. -`-6 :Site Wfth.4in`;d.es!&n:�* e�io�t6d -oj thii`g vi ii n ro m d W .................. ... AtV z5s 0 ril I. A"_chLdoq Rev IWOM APR 41984 STORM DRAINAGE CALCULATIONS FOR BETTER HOMES SYSTEMS, INC. Portions of Lots 14 and 15, Skelton's Lake McAleer 5 Acre Tracts 230th Street SW and Highway 99 M. B. Mey 9 # 2 6 2 1 4/4/84 ME-711 !FA -to 4/ A 1OYSOCAtWAWAftV4WeJv Aer. rd=WAVA"Wise (- ow-4*rlAff eafzkvzws 4F = erov 47 - oeWAex5-Ae4 X402WOrY .4 w VAMW.4WeAwW j W.1A W. ?I- 706jw 410 OOIUI9M'AWV,6,JZOWZArtW A& 14714C.YBO x 147ZeelAl. 4? le ( 0 - -z— ) C /. 72- ) C A 70 ) w z�y, e.',45 417 w 9 x -Z!Fio ZZS5 A Y&, i r _ , 99 -C- .w w --ammdr e ,QW. ,OA'r,-V 360 7 7' - 40 4L 2- . 0:3 r-O Z5 Awaw .9 6,9 Z- 3619?— 1282- a 1,7 C,944� ) —4 + zis 7,oroLp. 5 X, go) J/--swv je 6,VAWW e 2— Co.69 Z.0 /,7 �--s ( 1,7 Czt-� e = AZ :Pwoclew) 41 AWOWAW-F - . Ifzga h = P,'�Wr. A%W- 49W7MAW,4~i&VAW -*009*2,r~ I'vilee7- 00,11:,Ar,�r r-A- .6z ;73w— (0'.50 /0 /7-7 0 ZAI' 4f, C1:11 yp P-11 RUNOFF FACTORS FOR STORM SEWERS (values of "C" in CIA) FLAT ROLLING 0-5% 5% UNDEVELOPED LAND Wood & Forest.... 0.10 0.15 Sparse Trees & Ground Cover..::::::::::::::::: 0.15 C:Qk) Light Grass to Bare Ground ..... 0.20 0.25 DEVELOPED AREA Pavement & Roofs ...... 0.90 0.90 Gravel Roads & Parking 0.75 Q�J-0- Ci ty Bus ine s s. . . . 9 a 0 6 * 0 4 0 0 4. * 0 0 0 0 a 0 0 6 . 0 . 0 & 6 0 . 0 o 8 5 0 . 9 0 Apartment Dwelling 0.80 0.85 Industrial Areas ... 0470 0.80 Industrial Areas (Light) ...................... 0.60 0.70 Earth Shoulder ............... 0.50 Playground ................... 0.25 Lawnst Meadows & Pastures ....... 0.20 0.25 Parks 0.15 0.20 SINGLE FAMILY RESIDENTIAL (Dwelling Unit/dross Acre) 1.0 - 1.5 ..................... 1.5 - 3.0 DU/GA 0.30 .... o ............................. 3.0 - 3.5 DU/GA 0.35 .................. oo ............. 3.5 - 4.0 DU/GA 0.40 .......... o ..... 0 ..... * .......... 4.0 - 6.0 DU/GA..o 0.45 ........................... *.. 6.0 - 9.0 DU/GA Oo5 0 ................ 0 ... 0 ...... 0..*.. 9.0 - 15.0 DU/GA 0-:-�O- ..... o ................. o .... o ..... 0.70 i 18 I/VW 04-:719 V W . �W M= V A�V AUMP AMOV AMr M A NO' 66624M, "a . 14?.. This figure may be used to help estimate overland flow times for surf:1ce flow. TRAVEL TIME FOR OVERLAND FLOW I 16 s E-� 3 2 RL ml SQO�4cmlsw COUQT%.,,/ Ll a 0 = 1 IDO . 40 50 10 " Me- -IWI.10 -"%' III AM /, '� a e e- Z),ey 1"Amz> Aqk1 -7WAL-04-5 -aWI)97M M nO Y-P A1VM.* ore7d-W7-1,OA1 7W-A-W 10'Z,!%7'Alrdr AF��eAD OA1 aA14CVS7Z'1oeAffo6.0 -Ole, A5WZ:e,oAV41- /*-AWr A5e Ar.44&40 WAP4WA4D X-4,VX ,VAO 90 720 1AXI1Z5 AO Ar4V AWATC7, Nor I m 3 p r/o AM. aMal A CO 1 W14! A&OOCWACh95 C&7- /A/ 10014V74-C, Allor N "N CV., 79, 0 7 Z. CA 4: 0: At."o ca 4 w-, WAI - z&w *,4 a q "::, w - %"4ir WI~64W /0 ,OOWAoO' 96ZO eAfflAl 70 CA3 "-#~ -X N dvId- ��:r --Y . I r.w,00wjr co W/owjwv- AWVA-,O - - C/Iov lweaw) - 1",16 .1 RCITY OF EDMONDS ". FOR INSPECTION CALL PUBLIC WORKS DEPARTIOT Permit 7 6& 17 yzs�/5 F.Xt. nh Issue Date-47 7 6 SIDE SEWER PERMIT 4 293 PERMIT MUST BE POSTED ON JOB SITE k,-- '.ww�mwmw'mw3WrMr3WMWAMW-AWAWAW3WrJMFMWAWAW YIA BALLINGER 1. Address of Construction _?3goS X11r,0Vkj4q 99 1 IET STA 10A 2. Property Legal Description (include all. easements) o o 'A A + ta C_ v) ed 3. Single �Jily Residence Multi -Family No. of Units Commercial X N 4. Owner and/or Builder STREjET FILE 5. Contractor & License No. #0_5_1551 6. Invasion into City Right -of -Way: No X Yes . (If Yes Right-of- way Construction Permit Required - Call Dial Digl� *Y464W) before 800-424-5555 excavation). E-4 7. Cross other private property: Yes No __S4_ Easement required - attach legal description and county easement number. �4 READ THE FOLLOWT-,NG AND SIGN: P4 04 < a. Property owners must obtain a permit to install side sewers on >4 their property. A licensed side sewer contractor must be employed to construct side sewers in the public right-of-way. b. The side sewer contractor assumes full reponsibility for each E-1 installation for one year. N �4 C. Commercial establishment requires a minimum of a six inch (6") P4 z side sewer line. 0 d. Side sewers may not be installed closer than thirty inches (30") to any structure. e. Side sewer lines must be laid at a minimum grade. of 2% (1.15 0 and maximum grade of 100% (450). .% 0 f. No turn in side s8wer greater than 45 (1/8,bend) is 0 allowed between cleanout. All 90 turns must be constructed of a 45 (1/8 bend) and wye with removable cap. g. No down spout6, footing drains or floor drains can be connected to side sewer system.. h. Pea gravel is required for bedding when installing sewer lines through other than granular soil. i. Cleanouts ar)6 required at 30"-60" from each plumbing exit line and at minimum int;lorvals of 100' along sewer 'line run. j. Trenches within City right-of-way must be*restored to original conditions Contractors shall be responsible for right-of-way failure due to poor,,c ' ompaction of fill. k. Side sewer must be left uncovered until inspected and approved by the City. . 1. Inspection during normal working hours only. Two (2) working days notice required. DATE: �Kcertify -that I have read nd shall comply with the above PERMIT FEE: J6, 0 DISAPPROVED BY: Date: UW IiL4�14 01"el"rQ e_ o7s- - 0 0 B Date: CONNECTION FEE: Date: 4Ajd 24- 198 94 ::) APPROVED By 0 FZ4 aqz, PERMIT MUST BE,PQSTED ON JOB SITE 00 EYRiNq ores' rs SSOCIATES, INC. (206) 778-3101 23423 Highway 99 Edmonds, WA 98020 P.O. Box 32 Lynnwood, WA 98036 The following represents the property on 230th SW and Highway 99, per the attached sketch. Parcel A All that portion of Tract 14, plat of Skelton's Lake McAleer 5 Acre Tracts, per the plat as recorded in Volume 6 of Plats, page 21, records of Snohomish County, Washington, described as follows: Beginning at the intersection of the East line thereof and the Easterly margin of the Old U.S. 99 Highway; thence S 0044138" E along said East line, a distance of 218.01 feet; thence N 640161 W along a course thatis perpendicular to the said Easterly margin of old U.S. 99, a distance of 97.20 feet to a point on said Easterly margin; thence along said Easterly margin N 25044' E, a distance of 195.14 feet to the Point of Beginning. Parnpl n All that portion of Tract 15, plat of Skelton's Lake McAleer 5 Acre Tracts, per the plat as recorded ih Volume 6 of Plats, page 21, records of Snohomish County, Washington, described as follows: Beginning at the intersection of the North line thereof and the Easterly margin of the Old U.S. 99 Highway; thence along the North line thereof, N 89'37'38" E, a distance of 205.0 feet; thence S 0143137" E parallel with the East line thereof, a distance of 279.0 feet; thence parallel with the North line, S 89037'38" W, a distance of 218.18 feet to an intersection with a line that is perpendicular to the said Easterly margin of Old U.S. 99; thence N 640161 W, a distance of 15-72 feet to a point of intersection with the West line of said Tract 15; thence along said West line, N 0*44'38" W, a distance of 218.01 feet to a point of intersection with the Easterly margin of Old U.S. 99; thence along said Easterly margin, N 25044' E, a distance 'of 61.3 feet to the Point of Beginning. a 2/20/84 STREET FILE 0 U) 1�1 CA -Ar Side Sewer Drawing The City of Edmonds EASEMENT NO - ----------- -------------------------------- NEW CONSTRUCTION REPAIRS LID NO. � ------------------ ASMT. NO - ------------- OWNER 50MR-14cmES ------------------------------------------------- --------- CONTRACTOR ... WOLZMAN ------------------------------------------ PERMIT NO. _713(c.- JOB ADDRESS Z�005 --------- 14 ---- 99 ------ --------------------- LEGAL DESCRIPTION: LOT NO - ------------------------ I ------------- BLOCK NO. - YIA--BAL LIFT STATION ------------------- ----------------- - ------------- ---------- 04 ---------------- ---- NAME OF ADDITION ----------------------------------- 71 84 TEMPORAR5 "OIL& NOVIL OrVICA st-ra co log* M M S-MEL POS-r 4"n (Stoto pww-owi-1 1/75 (REV.1 1/78) Hwy 99 too 46 13,0P BIKE S140P Approved: XDATE +.Z.fl)V4;�1904 ------ By jor --- V*-*// ----------------- ---------- 0 �t -1? C. 1891, 9 Q CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 - FAX (425) 771-0221 Website: wwwdedmondsma.us DEVELOPMENT SERVICES DEPARTMENT Planning - Building - Engineering Mr. Nathan Chinn, Manager Armadillo Storage 23031 Highway 99 Edmonds, Washington 98026 RE: Property @ 23005 Highway 99 Dear Mr. Chinn: GARY HAAKENSON MAYOR 8-9MEET FILE March 7, 2003 The purpose of this letter is to formalize the City's decision with regard to the existing red labeled manufactured dwelling at the subject property that has been used, and is currently being used, as a retail sales office. In researching City Conditional Use Permit number CU-7-84, we have verified this permit was issued for 'outdoor storage' at the subject site. Please note, the application does not specify that a model manufactured red label dwelling wouldbe used as an office for selling purposes; however, it is our understanding that this was common practice for this type of business. Since you have provided information that the same manufactured red labeled dwelling has been on site and used as an office since April of 1984, the City considers this specific manufactured dwelling to be grandfathered for use as an office under permit CU-7-84. Please be advised, if the unit is changed out or replaced, (even if replaced due to natural disaster) it must be replaced with a black label commercial coach suitable for office use including barrier free access and toilet facilities. The City shall not permit a replacement red or gold label dwelling to be put on site for the purpose of office use. Or, you I could make application for a building permit to construct a complying Uniform Building Code building as a replacement office. This decision is appealable by filing a written notice of appeal, application form and appeal fee of $155.00 within 14 calendar days from the date of ' this letter. Failure to appeal shall waive any future appeal rights and administrative recourse in this matter. If you have any questions please feel free to contact me at 425-771-0220. Sincerely, Le" Jeannine L. Graf Building Official Cc: Planning Manager Street Address File Incorporated August 11, 1890 Sister City - Hekinan, Japan I V CITY OF EDMONDS File NoW— 7- 5;41 EDMONDS, WASHINGTON Date — Fee 0 APPLICATION TO HEARING EWIINER AP 'S FOR CONDITIONAL USE PERMIT Rect. No. 2ZO5 HEARING PATE Better Homes 13550 Aurora �V�re'. N! APPLICANT:Systems Inc. -ADDRESS Seattle,WA PHONE 367-77,66 Indicate type or degree of interest in the property: leasee Ockson OWNER: Will Shiomi ADDRESS AeORJ6 PHONE 32.3-1300 .Y-z 0 C, V7 0 c' LOCATION OF PROPERTY (ADDRESS) Z30th S.W. and Hwy 99 (address not issued) LEGAL DESCRIPTION OF PROPERTY North Westerly portion of Lots 14 & 15 of Skelton's Lake McAleer 5 Acrts Tracts (approx. 1.69 acres). Correct description of leased portion by Meyring'Sur—veyors,Inc. to be submit - To be completed by the Planning Division: Use Zone ted by Legal description checked and approved by: . —Date: 2/24/84. VICINITY SKETCH: Example: PLEASE SHOW BELOW A VICINITY SKETCH AS PER EXAMPLE, INDICATING NORTH. 5V&JE3C1r MOPERV CONDITIONAL USE REQUESTED: Outdoor Storage use I DETAILS OF PROPOSED USAGE: Retail Sales Office; sales and display, of manufactured homes. k. L, q,�-A qec. -Tpk CL4 97gnature of Appri—ca r or Representative RELEASE/HOLD HARMLESS AGREEMENT The undersigned applicant, his heirs and assigns, in consideration for the City processing.the application agrees to release, indemnify, defend and hold the City of Edmonds harmless from anv and all damages and/or claims for damages, including reasonable attorneys' fees., arising from anv action or inaction of the City whenever such action or inaction is based in whole or in part upon false, misleading or incomDlete information furnished by the applicant, his agents or employees. PERMISSION TO ENTER SUBJECT PROPERTY The undersigned applicant grants his, her or its vermission for public officials and the staff of the City of Edmonds to enter the subject property for the purpose of*insDection and posting attendant to this application. �,��aO4 S-e C tL�� bipT%ture 01 APDlicant, %,ner or Representative 0 ENVIRONMENTAL CHECKLIST A. BACKGROUND 1. Name of Proponent Better Homes S . ys tems, iric 2. Address and Phone Number of Proponent 13550 Aurora Avenue North Seattle, WA 98133 (2o6)367-7767 3. Date Checklist Submitted 2/16/1984 4. Agency Requiring Checklist City of Edmonds, Edmonds, Washington 5. Name of Proposal, if applicable NIA 6. Nature and Brief Description of Proposal (including but.not limited to its size, general design elements, and other factors that will give an accurate understanding of its scope and nature: To improve and develop the property (1-691'�Acres) for use as retail sales & display center for manufactured homes. 7. Location of Proposal (describe the physical setting of the proposal, as well as the extent of the land area affected by any environmental im- pacts, including any other information needed to give an accurate under- standing of the environmental setting of the proposal): The proposed site is located on Hwy 99 and 230th St. S.W. .Edmonds, WA. The sit.e is presently unimproved, situated in a developed business community. The proposed site for-.. - development contains 1.69 acres; the site -is relativel—_ y flat, with minimal growth ofhlow brush, weeds & unau-thorized dump-L.Lis Uf Waste 111atentat. 8. Estimated Date for Completion of the Proposal 4/15/1984 9. List of all Permits,'Licenses, or Government Approvals Required for all Proposal (federal, state, and local — including rezones): City of Edmonds Conditional Use Permit (for outdoor storage) Sign Permit, Building Permit, State of Washington Manufactured Housing Dealer's License, City of Edmonds Architectural Design Board Review & Approval. * 10. Do you have any plans for future additions, expansions, or further activity related to or connected with this proposal? If yes, explain. No. 11. Do you know of any plans by others which may affect the.property covered by your proposal? If yes, explain. No. 12. Attach any other application form that has been completed regarding the proposal; if none has been completed, but is expected to be filed at some future date, describe the nature of such application form: Sip-n Permit. Architectural Design Board Review Application -1- B. ENVIRONMENTAL IMPACTS (Explanations of all "ye§" and "maybe" answers are required). YES MAYBE NO 1. Earth. Will the proposal result in: a. Unstable earth conditions or in changes in geologic substructures? V b. Disruptions, displacements, compaction or overcovering of the soil? V c. Change in topography or ground surface relief features? V/ d. The destruction, covering or modifica- tion of any unique geologic or physical features? e. Any increase in wind or water erosion of soils, either on or off the site? _V f. Changes in deposition or erosion of beach sands, or changes in siltation, deposition or erosion which may modify the channel or a river or stream or the bed of the ocean or any bay, inlet or lake? V Explanation: A portion of site (fronting Hwy 99) will - be graded and graveled. Remainder of the site will be cleared of existing unwanted vegetation and waste material (unauthorized dumping). The evergreen trees on the site will be protected and incorporated in the landscaping treatment. 2. Air. Will the proposal result in: a. Air emissions or deterioration of ambient air quality? _V_ b. The creation of objectionable odors? c. Alteration of air movement, moisture or temperature, or any change in climate, either locally or regionally? V Explanation: — NIA 3. Water. Will the proposal result in: a. Changes in currents, or the course or direction of water movements, in either marine or fresh waters? b. Changes in absorption rates, drainage patterns, or the rate and amount of sur- face water runoff? &41 YES MAYBE NO c. Alterations to the course or flow of flood waters? V d. Change in the amount of surface water in any water body? V/ e. Discharge into surface waters, or in any alteration of surface water quality, including but not limited to temperature, dissolved oxygen or turbidity? V f. Alteration of the direction or rate of flow of ground waters? g. Change in the quantity of ground waters, either through direct additions or withdrawals, or through interception of an aquifer by cuts or excavations? h. Deterioration in ground water quality, either through direct injection, or through the seepage of leachate, phosphates, deter- gents, waterborne -virus or bacteria, or other substances into the ground waters? V i.. Reduction in the amount of water otherwise available for public water supplies? V Explanation:_N/A 4. Flora. Will the proposall result in: a. Change in the diversity of species, or numbers of any species of flora (in- cluding trees, shrubs, grass, crops, microflora and aquatic plants)? b. Reduction of the numbers of any unique, rare or endangered species of flora? c. Introduction of new species of flora into an area, or in a.barrier to the normal replenishment of exist- ing species? V d. Recution in acreage of any agri- cultural crop? _V Explanation : Existing growth of weeds and low brushes will be cleared. Landscaping treatment will be used to upgrade the site conditions. -3- 0 0 1 5. Fauna. WIll the proposal result in: YES MAYBE NO a. Changes in the diversity of species, or numbers of any species of fauna (birds, land animals including reptiles, fish and shellfish, benthic organisms, insects or microfauna)? b. Reduction of the numbers of any unique, rare or endangered species of fauna? c. Introduction of new species of fauna into an area, or result in a barrier to the migration or movement of fauna? V d. Deterioration to existing fish or wildlife habitat? V Explanation:— NIA 6. Noise. Will the proposal increase existing noise levels? V Explanation:— NIA 7. Light and Glare. Will the proposal produce new li'ght or glare? V Explanation: Minimal amount of site security lighting will be installed, in addition to the lighted sign in conformance with the City of Edmonds requirements (Ch.20.60). 8. Land Use. Will the proposal result in the alteration of the present or planned land use of an area? -V Explanation:— NIA 9. Natural Resources. Will the proposal. result in: a. Increase in the rate of use of any natural resource? V b. Depletion of any nonrenewable natural resource? V Explanation: —N/A -A- YES MAYBE NO 10. Risk of Upset. Does the proposal involve a risk of an explosion or release of hazard- ous substances (including, but not limited to, oil, pesticides, chemicals or radiation) in.the event of an accident or upset condi- tions? Explanation: NIA 11. Population. Will the proposal alter the location, distribution, density, or growth rate of the human population of an area? Explanation: NIzA 12.. Housing. Will the proposal affect existing To—ising, or create a demand for additional housing? Explanation: N/A 13. Transportation/Circulation. Will the pro- posal result in: a. Generation of additional vehicular movement? b. Effects on existing parking facili- ties, or demand for new parking? c. Impact upon existing transportation systems? _V d. Alterations to present patterns of circulation or movement of people and/or goods? e. Alterations to waterborne, rail or air traffic? _V f. Increase in traffic hazards to motor vehicles, bicyclists or pedestrians? Explanation:— On -site parking will be provided for customers. -Based on present customer counts, a total of 12 stalls will be able to accommodate the projected.parking needs. No significant increase to the traffic counts on hwy 99 is anticipated. -5- YES MAYBE NO 14. Public Services. Will the proposal have an effect upon, or result in a need for new or altered -governmental services in any of the following areas: a. Fire protection? b. Police protection? V c. Schools? V d. Parks or other -recreational facilities? e. Maintenance of public facilities, including roads? V f. Other governmental services? _V/ Explanation:_N/A 15. Energy. Will the proposal result in: a. Use of substantial amounts of fuel or energy? V b. Demand upon existing sources of energy, or require the development of new sources of energy? V Expl anation:_N/A 16. Utilities. Will the proposal result in a neeTT6_r new systems or alterations to the following utilities: a. Power or natural gas? V b. Communications systems? \I/ c. Water? V d. Sewer or septic tanks? e. Storm water drainage? V f. Solid waste and disposal? V Explanation:— Existing -systems- will be able to accommodate all our utilities needs. -6- YES MAYBE NO 17. Human Health. Will the proposal result in the creation of any health hazard or potential health hazard (excluding mental health)? Explanation: N/A 18. Aesthetics. Will the proposal result in t-he obstruction of any scenic vista or view open to the public, or will the proposal result in the'creation of an aesthetically offensive site,open to public view? V Explanation: Th,�, proposal will substantially improve pr esent site conditions. 19. Recreation. Will the proposal result in an impact upon the quality or quan- tity of existing recreational oppor- tunities? V/ Explanation: NIA 20. Archeological/Historical. Will the proposal result in an i—Iteration of a significant archeological or his- torical site, structure, object or building? V Explanation: NIA C. SIGNATURE I, the undersigned, state that to the best of my knowledge the above information is true and complete. It is understood that the lead agency may withdraw any declaration or non -significance that it might issue in reliance upon this checklist should there be any willful misrepresentation or willful lack of full disclosure on my part. %,&-�Avc PROPONENT: -7- EXHISIT. f. STAFF REPORT TO THE. KEARLNG EXAT41NER FILE #CU-7-84 HEARING DATE: MARCH 15, 1984 1. REQUESTED ACTION: Conditional use permi't for outdoor storage of manufactured homes. at 23005 H1ghway 99. TT. APPLICANT/OWNER: Applicant - Better Homes Systems, Inc. 18550Aurora Ave. N. Seattle, WA 98133 Owner Wi'll Sh.iomi' 1032 S. Jackson Seattle, WA 9810.4 11L. LEGAL DESCRIPTION: See Exhib,it 3. IV. STAFF FINDI'NGS AND CONCLUSIONS: A. Description of the SubJect ProDertv and Surroundino Area The subject property -is- 1.69 acres- lyi'ng directly southeas�t of the tntersection of Hfghway 99 and 230th St. S.W'. It slopes down about 5 to 10% from Highway 99 to the east. The site i's presently undeveloped and covered with scrub brush. Surrounding development is commercial to the west and south.. The areas immediately adjacent to the north and.east are un- developed. Further to the east is a mix of single- and. multi- family development. B. Official Street Map Proposed R/W Existi'ng R/W North 230th St. S.W. 601 501 West Highway 99 100, 1001 The Offi*cial Street Map indicates that a 10-foot dedicati'on is - required. Staff Report to the. H.eari'.ng Exami.ne.r E'xhi,b.i*t l/Fi'le #CU-7-84 Page 2 . C. Comprehensive Plan The Comprehensive Poli,cy Plan Map desi.gnates the subject property as commercial/bus-ines,s. As conditioned, the proposed use should not be s-i.gnifi'cantly inconsistnet with the purposies of the Comprehensive Plan. D. Zoning Ordinance The subject property,'as well as. the s-urrounding adjacent prop- erti'es, is zoned CG. As- condittoned, the proposed use.should not be significantly in confli'c-t wi'th. the purpos-.es of the. CG zone or the Zoni'ng Ordi,'nance. E.. Not Detrimental As conditfoned, th.e proposed use s:hould not be significantly - detrimental to the -public health., safety, or general welfare. A declaration of nons.i-gni.fi.cance has been issued. F. Transferability The permit, should it -be granted, should not be transferab.le. V. STAFF RECOMMENDATION: It i.s the recommendation -of the.staff that CU-7-84 be approved, subject to the f6llowi'ng conditions� 1. The driveway aprons on both Highway 99 and 230th St. S.W. must be pay.ed from the edge of the existing.pavement back a dil . stance of 25 feet. 2. S*i'dewalks, curb, and gutters wi'll be requi'red along -the H.i.ghway 99. frontage. 3. The driveway I is to be signed one-way, with the exit to the north- dts4gnated as right turn only. 4. A drainage plan may be required. 5. Fire lanes must be established that will provi.de acces-s to within 150 feet of all areas that are occupted by structures. 6. A portable fire extinguisher must be provided in the offi.ce area, minimum size 2, A-10, B:C dry chemical type.. 4, .0 S:taff Report to the. Heari.ng Examiner Exh-i-Iii.,t I/Fi'le #CU-7-84 Page 3 7. Comply wi.th,any Architectural Design Board requirements. 8. The.entrance�on 230th-St. S.W. ts� to be used for deTivery of all homes to the s.ite. 9. Dedicate 10 feet along 230th.-St. S.R., as- required by th.e Official Street Map. DVK/tq cc: File #CU-7-84 pay. FAWOO LZ- Ake- TREET N own 0 DD LlAPIA CM) CP AMCk (TM. I cz, MANAW (TV.) TO S*MT MA"M too �IWW%M Lpl. LAT AREA Mf PMWWT LM WOTE CONTOUR LINES SHOWN AFK APMX AND AT I Ft PITUMALS. 334A SITE Better Homes Systems Inc. PROJECT DATA ZONE, CG LOT AREA: 1.69 Aaft BLDG. AREA: ljM SF. FARKING: 6 STALLS AL PUR &V 11=0 PAUL Z*'-,NM," &.w;cm &Bum. of ammum" MUM Is 0 COX tioN - FA41*' ( W TED MILT. PAWMrK Lrr Vf. F,, r')K=T, (b - 5 + WA3T LAMFo) bUROUNDY LETTE" $ 50PZEA OPP *"TL bmAbRoLso 4 "-m 4m. p" up- (n?.) 4t10' X 41-100 wy.11d) Mr. Tuft FRO"m bEYONP FM GTMCW* 6101 99 OF b'-& LMOXAFS m ccl OEM 41"ILMN6 SIT eft"T I; PROMN L" SECTION THRU PROPERTY a HWY 99 SCALE: 1 30'- 0' L4XNDeW1 AM^ . bk— ILIA. SIGN �LEVATION SIM V1Fw llo-" MATA TO M. i . .. I I . . - 4 -%WP 1. 104 F14114F. CaW-. 6*9CLTS ' f� LSVEL 0 64PA V-CP IAN. KLOW a NAM Mr.) COLUMN BASE DETAIL SCALE:3"-I'-W DPAUL Z. WU ARCHITECT ffmnbw r;rA InstItutootarchil 8109. :.1131h. Kirkland VIA W033 ING182 -4873 91 bkCKLp&(TTr.) ftm PROM CDLDR b4AW ft*T Rkvw AMON OIJTDOOR DEPLAY AREA (TYPJ LANDSCAPE PLAN 426501th-MEET—S.W. Lba LTYPJ PLANTING LIST LEGEND OTY I SUE/ REMARKS (& me" 1 1+ SCOA.- so -sow. 0 4-- JA I j Aw We J, 0 m -74.0cm. 60 1 GAL. POT% 16 1 C%kL. rollb V IN ALL ftAWTW* ARNA PFDTKT MLOM DMAAM 4p TopacIL WN. e4 20AL.Pois IV-16'PUL PAUL Z. Wu ARCHITECT awnbw - amrican lothut 8109. H.E. 11 3th. KIrkiand VA 96033 12081823-4873 I IUl j 4t 4 C 1-4 HE WASTER EDROOM BATH REA,_ Rod HEN ENTRY Y.j Is 8YAELL Sill." tgq pr I 'M tj A I rp 1 [.V 'O,Ta-A I&OVAOwliffiffArt, ,:fd z Al 4 4 A rl Fie 010 CC � r". -Y T , , 0 RA i-*,.�z all, BY W3i/SE83 IN M I M 8 H 4, r - L ING FEATURES."..".. �j P"- �wt -I IV you get a lono Ilortg b4cuty�'�� oj� fine Bapington home, UO COMfOrt VW 9#1001;VY fOcturet: More good thing from us; nVrow M!" 7 V, -wow 4"-Qft I Olt bodroorns 'd -hall,�rnastor lnl�q roorn,l bodMOM' -OlUmt . *d�& '�jjVdJor W=her Al dW Wl W b*`-iP` Op ons tQ a* m w 0 Roman tub & c C= wp Dlshwa#w/jgafb*gwd z M '4? N—, 177777 I. 7e zi j'�; 7 0 'j; T. . W�i p� ""I"" r 11 IC k� e"'; :Wit f J,- I'.. 4 0; W," IF v'4 00 4 -0 100 &,HEAD tk UTILITY TCHEN BATH KI f 165 U3, ReA ! on qj: UNE MIN pr#a- JfA ,, " i) . , , LINSM -#rM bA 4k ;su 77777--' Ivr Olt �'BEDR ON T'i LIVING ROO 3 ededox"a Air b, Room d fob J:�- OPT. RREPLACK d1to fKR5 thr NAY AV* '�7 c p j:h ffjhWid I"' L% 00- hN A 'MAV 5. XX C44/48/AUS3 gi LIVING FEATURES You get all this and more when you move Into this fine Green Hill home, More good things from us; more value for you I '14 ,mv, W.' rr TWOM., X, 4000119IF-W9411 fu TV;1 W* HUD COO O*rKkm# VIThermdIll 204 It lftWtatkwil`�4 `w colngsf k Pat qtaz*d Wlndow#. PMC PWTF;D IN LXA W" in 77� 4__ Z if ­7 �4 4-, 7`7 "k V '�'01'30 gallon olocM ECW clean vinyt floor owown ,6, Solid vIny1'cov*r*d qypsuM, 4, 0 Painted,cabine 4,,, through -out 9, Cabinet base and 4 IP 47,0 PLW, elect& CarPOtW/pQd-lMngrQ40M�... q-, 200 amp sWc* dini ng room, master boclmarq�,��,� W.- full length Org ng m K 30" olectfic range pes IM qm4 v,��WR 4r power dlnln "0 txmd W g romondffi --with _114 C4 a., re"floor 'Nil 11114. GQrc%M, _NO,w/jh*w*r jq A, sto ub VfMxwer hall bath I" O,Med Idne cabirAt wimilmr4low 1, M, Pine drawer sides w/rollem- - avollable. Be sure 001 gull and m nr Ze - nt��, LM, N a SAW '4,_j OW11 I W's A: A:i �;;.,.,_k � � -M Z, Z v E XHIBIT L c I ck —k r —1 —1 F�- 1,:\ � � S y s --� C., 0 -EXHIBIT 9,*, FILE # CU-7-84 FORM FOR (UMM/FINAL) DECLARATION OF (VIMMMUMONSIGNIFICANCE) Description of proposal Conditional use permi't for outdoor storage_ of manufactured homes. Proponent Better Homes Systems, Inc. Location of Proposal 23005 H4ghway 9.9 Lead Agency, City of Edmonds This proposal has been determined to (MVk/not have) a significant adverse impact upon the environment. An EIS (AX/is not) required under RCW.43.21C.030(2)(c). Th,is decision was made after review by the lead agency of a completed environmental checklist and other information on file with the lead agency. Responsible Official Duane V. Bowman Position/Title Assis.tant Ci:tylPlanner , Da te March. 8, 1984 Signature 11,&4W C.E J Y E D FINDINGS AND DECISION R 0 OF THE HEARING EXAMINER OF THE CITY OF EDMONDS C11Y OF �EDIWO ' Nq$ IN THE MATTER OF THE APPLICATION FILE: CU-7-84 OF BETTER HOMES SYSTEMS, INC. FOR APPROVAL OF A CONDITIONAL USE PERMIT DECISION: The conditional use permit is granted subject to the conditions listed. INTRODUCTION Better Homes Systems, Inc., 13550 Aurora Avenue North, Seattle, Washington, 98133, and hereinafter referred to as Applicant, has requested approval of a conditional use permit for outdoor storage of manufactured homes at 23005 Highway 99, Edmonds, Washington,,.and more particularly described as set forth in Exhibit 3 attached hereto. Ahearing on the request was held before the Hearing Examiner of the City of Edmonds, Washington, on March 15, 1984. At the hearing public testimony was presented by: Duane Bowman Planning Dept. City of Edmonds Edmonds, WA 98020 Mike Woldman 13550 Aurora Ave. No. Seattle, WA 98133 The following exhibits were presented and admitted at the hearing: Exhibit 1 - Staff Report 11 2 - Application if 3 - Legal Description. If 4 - Site Plan if 5 - Sign and Cross Section Drawing It 6 - Landscape Plan to 7 - Typical Home Plans it 8 - Photographs it 9 - Negative Declaration it 10 - Quit Claim Deed (submitted after the hearing) After due consideration of the evidence presented by the Applicant; evidence elicited during the public hearing; and, as a result of the personal inspection of the subject property and surrounding areas by the Hearing Examiner, the following findings of fact and conclusions constitute the basis of the decision of the Hearing Examiner. FINDINGS OF FACT 1. The application is for a conditional use�permit for outdoor storage of manufactured homes at property located'at 23005 Highway 99, Edmonds, Washington, and more particularly Findings * and De*on of the Hearing Examiner of the City of Edmonds Re: CU-7-84 Page 2 described as set forth on the attached Exhibit 3. 2. The subject property is 1.69 acres of land that is 1-ocated directly southeast of the intersection of Highway 99 and 230th Street S.W. The land slopes in an easterly direction at a 5 to 10% grade'. The site.is undeveloped and is covered with scrub brush. 3. Development of the surrounding properties include the followihg: West and South: Commercial North and East,: Undeveloped 4. It is the intent of the Applicant to use the subject pro- perty as a storage and -showing area for model homes. The model homes will be displayed on the site and they will be furnished, decorated and landscaped. There will be no permanent foundations for the model homes. 5. The site will be gravel and attempts to,k.eep it in its naturalstate will be made. No asphalt will be used. 6. In order for a conditional use permit to be granted in the City of Edmonds, the criteria as set forth in Section 20.05.010 of the Edmonds Community Development Code must. be adhered to. These criteria include: A. The proposed use must be consistent with the Com- prehensIve Plan of the City of Edmonds; B. The proposed use in its 'location must be consistent with the purposes of the zoning ordinance in which the property is located; and, C. The proposed use must not be significantly detrimental to the public health, safety or welfare, nor injurious to nearby private properties or improvements. 7. The subject property is zoned General Commercial (CG). The surrounding properties are also zoned CG. 8. The property fronts on Highway 99. There'is sufficient right_ of way on.' Highway 99 for the development of this property. The property also borders 230th Street S.W. The proposed right -of way for this street is 60 feet. The existing right of way is 50 feet. Thus, in order to develop the property, it is imperative that the owner of the subject property dedicate 10 feet of right of way. 9. The Comprehensive Policy Plan Map of the City of Edmonds designates the subject property as Commercial/Busiiness. Findings and De on o± the Hearing Examine* the City of Edmonds 48 Re: CU-7-84 Page 3 10. The proposed use will not be significantly detrimental to the public health, safety or general welfare. 11. Pursuant to the State Environmental Policy Act a declaration of non -significance has been issued for the subject property. 12. The -Applicant is not the owner of the subject property. The owner of the subject property has joined in with the requested conditional use permit. 13. The Planning Department of the City of Edmonds has recommended approval of the conditional use permit subject to the fol- lowing conditions: 1. The driveway aprons on both Highway 99 and 230th Street S.W. must be paved from the edge -of the existing pave- ment back a distance of 25 feet. 2. Sidewalks, curb,,and gutters will be required along the Highway' 99 frontage. 3. The driveway is to be signed one-way, with the exit: to the north designated as right turn only. 4. A drainage plan may be required. 5. Fire lanes must be established that will provide access .to within 150 feet of all areas that are occupied by structures. 6. A portable fire extinguisher must be provided in the office area, minimum size 2, A-10, B:C dry chemical type. 7. Comply with any Architectural Design Board,requirements. 8. The entrance on 230th Street S.W. is to be used for delivery of all homes.to the site. 9. Dedicate 10 feet along 230th Street S.W., as required by the Official Street Map. 14. The Architectural Design Board of the City of Edmonds ap- proved the application of the Applicants on March 7, 1984. Conditions of approval were made. 15. On March 20, 1984, the owner of the subject property dedi- cated 10 feet along 230th Street S.W. as required by the Official Street Map of the City of Edmonds. 16. Significant landscaping will occur along Highway.99 and along 230th Street S.W.. This landscaping will minimize any*'visual impacts the proposed project may have on the Findings and D�e CO- on of the Hearing Examiner of the City of Edmonds Re: CU-7-84 Page 4 surrounding area. 17. No adverse testimony was received in this matter. CONCLUSIONS 1. The application is for the approval of a conditional use permit for outdoor storage of manufactured homes at 23005 Highway 99, Edmonds, Washington, and more parti- cularly described as set forth on the attached Exhibit 3. 2. The criteria as set forth in Section 20.05.010 of the Edmonds Community Development Code has been met by the application. 3. With conditions for access and for curbs, gutters and sidewalks the proposed conditional use permit will not be in conflict with the zoning ordinances of the City of Edmonds and in particular the CG zones. 4. The requested conditional use permit is consistent with the Comprehensive Policy Plan Map of the City of Edmonds in that it satisfies the criteria for a commercial busi- ness in a CG zone. Further, the project,with.proper landscapinglis based on a design principal that will assure the . visual quality and aesthetic harmony of the community and Highway 99. 5. The proposed conditional use permit will not be detrimental to the public health, safety or welfare. 6. The conditional use permit should not be transferable. 7. The Planning Department of the City of Edmonds has recom- mended approval of the conditional use permit subject to the conditions as set forth in finding #13. DECISION Based upon the preceding findings of fact and conclusions; the testimony and evidence submitted at the public hearing; and, upon the impressions of the Hearing Examiner at.a site view, it is hereby ordered that the requested conditional use permit be granted. The specific request is a conditional use permit for outdoor storage of manufactured homes at 23005 Highway 99, Edmonds, Washington, and is granted subject to the following conditions: 1. The driveway aprons on both Highway 99 and 230th Street S.W. must be paved from'the edge of the existing pavement for a distance of 25 feet. Findings and De 19on h of the Hearing Examiner t e City of Edmonds Re: CU-7-84 Page 5 2. The Applicant shall be required to install sidewalks, curb, and gutters along the Highway 99 frontage. 3. The driveway is to be a one-way road. The entrance to the driveway will be off 230th Street and will exit onto Highway 99. At Highway 99. only a right turn will be allowed. This traffic circulation is to be clearly signed. 4. Upon a determination of the City Engineer of the City of Edmonds a drainage plan for the subject property may be required. 5. Fire lanes must be established that will provide access to within 150 feet of all areas that will be occupied by structures. 6. A portable fire extinguisher must be provided in the office .area, minimum size 2, A-10, B:C dry chemical type. 7. the Applicant is to comply with all Architectural Design Board conditions as set forth in the approval of March 7, 1984. 8. The entrance on 230th Street S.W. is to be used for the delivery of all homes to the site. No delivery will be allowed off Highway P9. 9. The Applicant is to dedicate 10 feet along 230th Street S.W. as right of way for 230th Street S.W. 10. The conditional use permit is not transferable. Entered this 28th day of March, 1984, pursuant to the authority granted the Hearing Examiner under Chapter 20.100 of the Com- munity Development Code of the City of Edmonds. ZAMEP M. DRISCOLL HeaJing Examiner 10 Findings and Decision of the Hearing Examiner of the City of Edmonds Re: CU-7-84 Page 6 NOTICE OF RIGHT TO APPEAL Written appeals alleging specific error of fact or other grounds for appeal may be filed with the Planning Department, City of Edmonds, Civic Center, Edmonds, Washington, 98020, within fourteen (14) days of the date of the Hearing Examiner's final action. In this matter, any appeal must be received by the Department prior to 5:00 p.m. on April 11, 1984. .f& AUTHORIZATION TO SOLICIT BIDS FOR RENOVATION OF WADE JAMES THEATER LItem (E) on Consent AgendaJ Councilmember Jaech asked if the funds for this project were budgeted. City Engineer Jim Adams replied that HUD block grant funds were being used. In response to a question from Councilmember Kasper, Me. Adams said the architectural plans should be completed by Wednesday, April 11, and would be available in his office for review any time after that. Planning Director Mary Lou Block said the improvements included paving the parking lot and handicapped ramps, restrooms and seating. COUNCILMEMBER MOTION: JAECH MOVED, SECONDED BY COUNCILMEMBER KASPER, TO AUTHORIZE SOLICITATION OF BIDS FOR RENOVATION OF WADE JAMES THEATER. MOTION CARRIED. ACCEPTANCE OF QUIT CLAIM DEED FOR RIGHT-OF-WAY (SHIOMIICHINN) rI_t_em_rFT`on Consent AgendaJ Councilmember Jaech realized this item is required by the Official Street Map, but asked what CU-7-84 involved. Ms. Block said CU-7-84 is a conditional use permit for use of property on Highway 99 for a trailer sales yard -and the outdoor storage requires a conditional use permit. In response to further questions, Ms. Block explained that these rights -of -way are required bythe Official Street Map and are returned to the property owner if the Official Street Map is amended, the street is officially narrowed and excess right-of-way results. COUNCILMEMBER JAECH MOVED, MOTION: SECONDED BY COUNCILMEMBER KASPER, TO ACCEPT QUIT CLAIM DEED FOR RIGHT-OF-WAY (SHIOMI/ CHINN). MOTION CARRIED. AUTHORIZATION TO ADVERTISE FOR PURCHASE OF LADDER TRUCK ($26,000) LItem (H) on Consent AgenKaT In response to a question from Councilmember Jaech, Acting Public Works Superintend- ent Bobby Mills explained that funds for replacement of vehicles have been set aside. Currently there is $16,000*-budgeted in 1984 and $11,000 in the B Fund for purchase of this vehicle. Mr. Mills responded to questions from Councilmember Kasper and Wilson explaining that the present vehicle was purchased used in 1964 and has been used only for emergency purposes to prolong its useful life. A new truck would be used for various activities in addition to changing of.traffic signal lights, such as last year's repair of the grandstand, trimming tree limbs in the City parks, installation of banners for special events, etc. He said the only other truck of this type is owned by Snohomish County. Mr. Mills said he had investigated the possibility ofobtaining a used truck but the only ones available cost close to $20,000. He added that the present truck would be traded in or sold upon purchase of a new truck. COUNCILMEMBER JAECH MOVED, SECONDED BY COUNCILMEMBER WILSON, TO AUTHORIZE MOTION: ADVERTISIN ' G FOR PURCHASE OF A LADDER TRUCK. A roll call vote was taken: Council - members Jaech, Wilson, Ostrom, and Dwyer voting yes; Councilmembers Nordquist and Kasper voting no. MOTION CARRIED. PROPOSED RESOLUTION OF INTENTION 263 SETTING HEARING DATE FOR CREATION OF LID TO FUND WATER LOOP IN AREA OF EDMONDS WATERFRONT r1tem (J) on Consent Agenda] City Attorney Mark Eames explained that two exhibits were missing from this item which were required by the State. Therefore the Resolution could not be passed this evening. COUNCILMEMBER JAECH MOVED, SECONDED BY COUNCILMEMBER KASPER, TO MOVE THIS MOTION: ITEM TO THE APRIL 17 CONSENT AGENDA. MOTION CARRIED. ION OF PLANNING BOARD RECOMMENDATION AND PROPOSED ORDINANCE 2424 REMOVING THE REMENT THAT CONDITIONAL USES IN RM ZONES BE LOCATED ON ARTERIAL STREETS (CDC-4- Item (K) on Consent Aaendal Councilmember Kasper asked if the State were the only agency that could approve arterial designations. Or. Adams replied that the City recommends arterial desig- nations and the State approves and prints them. Councilmember Kasper commented that the criteria for arterials as set by the State are not always adequate since 76th Ave. W. is not designated as an arterial. COUNCILMEMBER.KASPER MOVED, SECONDED BY MOTION: COUNCILMEMBER NORDQUIST, TO ADOPT PLANNING BOARD RECOMMENDATION AND ORDINANCE 2424 REMOVING THE REQUIREMENT -THAT CONDITIONAL USES IN RM ZONES BE LOCATED ON ARTERIAL STREETS. MOTION CARRIED. Councilmember Nordquist raised a point of order regarding -an item not on the agenda concerning traffic through the Neadowdale construction and asked the Council to place this item on the agenda during the Council portion. The Council agreed. EDMONDS CITY COUNCIL MINUTES Page 2 - April 10, 1984 -6gT FILE JRR Engineering, Inc. 16030 52nd Ave. W. Edmonds, WA 98026-4724 (425) 787-6020 RF.CEIVED APR 2 6 UD DEVELOPMENT SERVICES CTR. CITY OF EDMONDS Client: Northwest Foundations Project Location: Edmonds, WA P.O. Box 12867 Mill Creek, WA 98082 1(425) 483-2245 Scope: Structural Calculations for Detention Vault Code: 1997 UBC ACI 318-95/316R.95 Live Loads: HS 25-44 Traffic load II I Dead Loads: Roof Load: 106 psf (Precast Planks by Concrete Tech.) Soil Weigh, y: 140 pcf Concrete Weight, y: 150 pcf Water, y, 62.4 pcf I Soil Values per Geotech Consu Itants, Inc.: Soil Bearing: 4000 psf (Geotech to veri i7y)L Active Equivalent Fluid Pressure: 35 psf I At -Rest Equivalent Fluid Pressure: 35-psf,+ 10 psf ht of wall Passive Equivalent Fluid Pressure: 300 psf Soil Weigh, y: 140 pcf Friction,,It: 0.5 1 Prepared by: AMR Checked by: RKR Project Name Armadillo YAult )00 Project No. 00 - 01A 3/23/2000 Page 1 or- 10 ENqiNEERiNq & PIANNiNq SERViCES 16030 52nd Avenue West. e Edmonds, WA 98026-4724 (425) 745-1766 e Fax (425) 742-5221 Project Name- WW li::7 D-1 - N-ZMA,-DlkLlC--, \J A 0 I-T No.- 00 -C) I X Sheet a of 10 ENqiNEERiNq & PtANNiNq SEROCES 16030 52nd Avenue West * Edmonds, WA 98026-4724 (425) 745-1766 9 Fax (425) 742-5221 Project Name: Ow X'ZMkVlLL-0 '�kQL:r — No.: Sheet 3 of I C) ENqiNEERiNq & P[ANNiNq SERViCES 16030 52nd Avenue West. a Edmonds, WA 98026-4724 (425) 745-1766 * Fax (425) 742-5221 ProjeCt Name: WVJ 5:-pM kVMkIDILLQ \jPl\)\--r No.: 60- 01 Sheet Ll of A 0 ENqiNEERiNq & PIANNiNq SEROCES 16030 52nd Avenue West. e Edmonds, WA 98026-4724 (425) 745-1766 9 Fax (425) 742-5221 Project Name: OA Al'RMkV"-L-R \J P%a I-T - No.: Q 0 - C)A N 71 ---------------- Y- �O S z J., A 7 z6,i (!,..s 1? J. J -Ar At q Ll \C. C, k iz. ('13, C-1)( Ai 110 I Lt 6) 11.4 0 UJ4 -H) +: bic; qL 6 I Ll �(O C) C) k 46C)o T�Vr� C) LO �It C-61306 I&F- Q S V T�l C lAr-7 L Y- 'T p- a + 1-6i L�� + + C, L� O's ?- 0 Miz /M k .3 L\ /Z -Tlz-y �,F-r-T4 T. Ll 0. Zq 5 12 a 0. -3 i5 le- C-Z sheet S of I D - A31rJZ2 ENqiNEERiNq & PIANNiNq SERViCES 16030 52nd Avenue West. * Edmonds, WA 98026-4724 (425) 745-1766 e Fax (425) 742-5221 ProjeCt Name: J�NVVANt�IL.1,0 PQ L-T No.: Sheet (0 of 10 AM4r2Oe&='jrlz4 ENCjiNEERiNq & PIANNiNq SEROCES 16030 52nd Avenue West -9 Edmonds, WA 98026-4724 (425) 745-1766 9 Fax (425) 742-5221 ProjeCt Name: �A\rd 7i> vA - NR&A k-D i t��g \/ k\j �--T — No.: 0c) - 0 1 )S' Sheet r7 of 1 0 MIrlimeezubmt ENqiNEERiNq & PIANNiNq SEROCES 16030 52nd Avenue West. * Edmonds, WA 98026-4724 (425) 745-1766 -P Fax (425) 742-5221 ProjeCt Name: hl W P�\T-mNml%o-o '� kOL-T - No.: CD 0 Sheet 8 of 10 ar*JR )MX'jM4e&='jrjbM* ENqiNEERiNq & PIANNiNq SERViCES 16030 52nd Avenue West * Edmonds, WA 98026-4724 (425) 745-1766 * Fax (425) 742-5221 ProjeCt Name: 1�\Pj W-DW - NZ'4k'C>ALJ-O \J A, 0 UT No.: 0 0 - 0 1 [-\ Sheet 9 of I D ENqiNEERiNq & PIANNiNq SEROCES 16030 52nd Avenue West. a Edmonds, WA 98026-4724 (425) 745-1766 * Fax (425) 742-5221 Project Name: ll�'tJ 'Povl - ��mktwao \j t�wL-7 No.: 00 -0 Sheet 10 of 10 �t'r? , . 1 S () 13 CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 - FAX (425) 771-0221 DEVELOPMENT SERVICES DEPARTMENT Planning - Building - Engineering April 10, 2000 Mr. Ray Miller, PE Group Four, Inc. 16030 Juanita -Woodinville Way NE Bothell, WA 98011 GARY HAAKENSON MAYOR SUBJECT: Proposed Grading for Shiomi Investments at 23005 SR99, (PC 00-128) Dear Mr. Miller, The Engineering Division reviewed your civil site design. The review team notes the following revisions/corrections. Please contact the review team member directly for questions regarding his comments. Storm Drainage — Don Fiene. Hydraulics Engineer at 025) 771-0220. Ext. 323 Provide sequence of construction notes on sheet 1/2. Add verbatim notes on stabilization of exposed soils. 0 Add other notes as indicated. When the revisions are complete, please return the attached redlined plans, together with three sets of revised plans, for construction approval. If you have any other questions, do not hesitate to contact me at (425) 775-7744. Sincerely, �21n� C. HYDE Development Services Engineer GCH/cmc Enclosure c: DST R:\ENGR\CiORDY\Shiomigrading.DOC Incorporated August 11, 1890 Sister Citv - Hekinan. Janan City. of Edmond* RIGHT-OF-WAY CONSTRUCTION PERMIT Permit Number. -00 Issue Date: A. Address or Vicinity of Construction: 23005 Hwy It GTE to e, and maintain a buried vice Place, operat go . 199 B. Type of Work (be specific): wire from existing pole #T261 located at corner of Hwy 99 & 230th St. SW then South east to a residence at 23005 Hwy 99. to plow 140 feet, ush no driveway, And pigh no road- R-n.W- Fnnfaqp 9n fomi-_ GTE Northwest IncorporAed C. Contractor: Marilyn Holmgren, Permit CoordinatcCoontact: Dennis Alexander 206/771-9036 mobile 388-1358 2312C W. Casino Road Mailing Address: FyArgat-4- WA 9A9n1L-1hhn Phone: Marilyn 206/710-0786 State License #: Liability Insurance: Bond: $ D. Building Permit # (if applicable): Side Sewer Permit # (if applicable): E. E] Commercial E3 Subdivision El City Project E3 Utility (PUD, GTE, WNG, CABLE, WATER) Multi -Family E] Single Family Other 2100-tPOOlDb 242310 INSPECTOR: INSPECTOR: �Q F. Pavement or Concrete Cut 0 Yes [9No G. Size of Cut: x H. � P.ljuse.aee. attached ske APPLICANT TO READ AND SIGN INDEMNITY. Applicant understands and by his signature to this application, agrees to hold the City ofEdmondg harmless from injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made ajainst the City of Edmonks, oi- any ofit# departments or employees, including or not limited to the defense ofany legalproceedings including defense cosi�, and attorney fees by reason ofgrandng thispermit. THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL INSPECTION AND ACCEPTANCE OF THE WORK ESTIMATED RESTORATION FEES WILL BE HELD UNTIL THE FINAL STREET PATCH IS COMPLETED BY CITY FORCES, AT WHICH TIMEA DEBIT OR CREDIT WILL BEPROCESSED FOR ISSUANCE TO THE APPLICANT. Construction drawing of proposed work required with permit application. A 24 hour notice is required for inspection; Please call the Engineering Division, 771-0220. Work and material is to be inspected during progress and at completion. Restoration is to be in accordance with City Codes. Street shall be kept clean at all times. '1!raffic Control and Public Safety shall be in accordance with City regulations as required by the City Engineer. All street cut ditches shall be patched with asphalt or City approved material prior to the end of the working day; NO EXCEPTIONS. Ihave read the above statements and understand thepermit requirements and thepink copyof thepermit willbe available on si 11 ' s o * spection purposes. : t John H. Stewart January 8, 1997 Signature Date: Jg1?jft6f"tor Agent) bec mgr-ACcess Design CALL DIAL -A -DIG PRIOR TO BEGINNING WORK FnR CITY I TSE ONLY APPROVED BY: TIME AUTHORIZED: VOID AFTER DAYS SPECIAL CONDITIONS: COMMENTS: DATE: RIGHT� OF -WAY DEPOSIT DISRUPTION FEE/F`UND- Ill: RESTORATION FEE: PERMIT FEE: TOTAL,FEE: RECEIPT'FEE: ISSUED BY: NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE Eng. Div. 1994 a a FIELD INSPECTION NOTES Comments: Diagram.: CONTRACTOR CALLED FOR INSPECTION Partial Work Inspection by P.W.: Work Disapproved By: FINAL APPROVAL BY: (Fund 111 - Roxite copy to Street Dept.) El YES Date: Date: 1:1 NO -1 I IR A PERMIT SUBMITTED BY GTE ----------------------------- Qlz LEGEND PEDS 0 POLES 0 ROAD BORES OVERHEAD LINES I.D.LITILITY POTHOLE CD UG TRENCHING ---UGT— I k - - - - - - - - - - - - - - - - - - - - - - - - - - - - 13 0 ST -5 UJ -------------- ------------- R.O. W - EOP A-------------- Mv t WWI qv THE FOLLOWING INFO TO BE PROVIDED m RIGHT OF WAY LINES.EOP OR FACE OF CURB, EXISTING SIDEWALK, J'OLES, ROAD CUTS AND THE UTILITY UNDER ROAD CUTS, ABOVE GROUND FACILITIES,(le:) PEDS,BDXES.CABINETS, ETC..UNDERGROUND TRENCHI.%4G AND OVERHEAD LINES. A. I 0 0 a'o I �i .14 00 M m 3 CITY OF EDMONDS 250 5th AVE. N. e EDMONDS, WASHINGTON 98020 * (206) 771-3202 COMMUNITY SERVICES January 14, 1987 J. Michael Woldman Better Homes Systems, Inc. �--23005�::Hfghway -99 Edmonds, Wa 98020 Dear Mr. Woldman, "TREET FILE 0 LARRY S. NAUGHTEN MAYOR PETER E. HAHN DIRECTOR On December 31, 1986, this office sent you a letter requesting that you obtain a fill permit for material placed on the above mentioned property without obtaining proper permits. We requested that you have your engineer come in with grading and erosion control plans to apply for the permit by Friday, January 9. No permit has been filed to date. Again, we are requesting that you have your engineer come in and apply for the fill permit. Information required for the permit is summarized in our December 31, 1986 letter, a copy of which is attached. Please have your engineer apply for the permit by Friday, January 23, 1987. If you or your engineer have any specific questions about information required for the permit, please call Jerry Hauth of the Engineering Division at 771-3202. You are hereby informed that if you fail to comply by making. application for the fill permit by January 23, this matter will be turned over to the City Attorney for legal action. Sincerely, e'Y'1 Z. Leigh Francis Code Enforcement Technician cc: Jerry Hauth Jeannine Graf Wilce Shiomi PUBLIC WORKS 0 PLANNING 0 PARKS AND RECREATION 0 ENGINEERING t. CITY OF EDMONDS D"NEW ADDITION RETIREMENT Proper ' ty of - ASSET INFORMATION SHEET CITY OF EDMONDS 04423 ASSET NO. ADDITION TO ASSET NO. DESCRIPTION SERIAL NO. ft� LOCATION nX,� "PURCHASE ORDER NO. - PURCHASE ORDER DATE COST B.A.R.S. ACCOUNT NO. ESTIMATED LIFE INITIATED BY DATE *PROJECT NUMBER PROJECT COMPLETION DATE COST -74 APPROVED BY "SUBMIT ASSET INFORMATION SHEET WITH FINAL PAYMENT REQUEST *SUBMI T ASSET INFORMATION SHEET UPON CLOSE OF PROJECT ACCOUNTING ONLY R/DEPRECIATE MONTHLY DEPRECIATION AMOUNT ANNUAL DEPRECIATION AMOUNT - G.L. ENTRY REFERENCE DATE VERIFIED BY PROCESSED BATCH NO., - INITIAL (�np DEPARTMENT FILE CITY OF EDMONDS LARRY S. NAUGHTEN MAYOR 250 - 5th AVE. N. - EDMONDS. WASHINGTON 98020 - (206) 771-3202 OFFICE OF THE CITY ENGINEER June 13, 1984 Mr. Max Meyring Meyring & Associates, Inc. 23423 Highway 99 Edmonds, WA 98020 Dear Max: SUBJECT: REQUEST FOR WAIVER OF DRAINAGE OIL SEPARATORS FOR BETTER HOMES, INC. AT 230TH & HIGHWAY 99 We have considered your reevaluation of the need for the drainage basin oil separator for Better Homes, Inc. We shall not require the system to be completed at this time, but will continue to monitor it. After six months, we shall recontact your office and at that time make a further determination of its need. Sincerely, jJA S E. ADAMS, P.E. C1 En;gilrneer DS/ml SMITH D7 CITY OF EDMONDS APPLICATION to the ARCHITECTURAL DESIGN BOARD OWNER/REPRESENTATIVE DATE A FILE., # J SITE PLAN BUILDING PLANS (3): ELEVATIONS LANDSCAPE PLAN ENVIRONMENTAL DATA RECEIPT # SIGN EXHIBITS VF'EE >-�/C,�ECPT # PLAN MODIFICATIONS TO FILE NUMBER: �rHEARING DATE 2z-)-zV-y 1-A 'Ac! 6 r- re. e7— ky 0 "-s' 2' S PHONE 3 ADDRESS- a 3o T-ff 4- 'Y-�Z f � L­A94 ZIP CODE. ARCHITECT/DESIGNER PROPERTY ADDRESS LEGAL DESCRIPTION AT 9 -4- ? 9 J5 o~i-P S PLANS SUBMITTED FOR APPROVAL: PHONE '& 0,�,95 - #1� /a Yf,/ Z 0 N I N G -1. Building Plans - Preliminary Final Site Plan Landscape Plan Elevations 2. Sign Elevations .21 Site Plan Land"scape Plan_ 3. Modification of previous approval - A ip 1�) - oPJ Lq �TA OeoL- /3,7^ it 0 1; 1- o.2 a EXISTING USE OF PROPERTY r-Ifs DESCRIPTION OF PROPOSAL /2 0-2 A /J C rL flo C'..' Ae-1 r'T t', � ry 1) 13 T-0 Fsietsre" Pel-eS :FjtoCr—Q-7— APPROXIMATE DATE WORK WILL BEGIN ON PROJECT J-LLy ESTIMATED TIME FOR COMPLETION OF WORK %7—LA Ly /S-7!4� RELF-ASE/HOLD HARMLESS AGREEMENT: The * undersigned applicant, his heirs and assigns, in consideration for the City processing the application agrees to release, indemnify, defend and hold the City of Edmonds harmless from any and all damages and/or claims for damages, . including reasonable attorneys; fees, arising from any action or inaction of the City whenever such action or inaction is based in whole or in part upon false, misleading or incomplete information furnished by the applicant, his agents or employees. PERMISSION TO ENTER SUBJECT PROPERTY: The undersigned applicant grants his, her or its per- mission for public officials and the staff of the City of Edmonds to enter the subject property for the purpose of inspection and posting attendant to this application. (Sign4Lre 6f Applicant) WHITELEY JACOBSEN AND ASSOCIATES ARCHITECTURE ENGINEERING PLANNING 2118 Third Avenue Seattle, Washington 98121 (206) 623-0331 31 July 1984 Mr. Hal Reeves Building Department Edmonds Civic Center 250 Fifth North Edmonds, WA 98020 Re: Sign Support for Addition of Second 51 x 101 Reader Board for Better Homes Achitect: Paul Z. Wu Engineer: V.L. Lindberg, P.E. Dear Mr. Reeves: 8422 We have reviewed the structural calculations on the subject sign addition and the support provided by the existing column and foundation and do not take any exception to the design as presented. - Very truly yours, W J A Architects, Engineers, Planners H Jack . Whiteley, P. President I WHITELEY JACOBSEN AND ASSOCIATES ARCHITECTURE ENGINEERING PLANNING 2118 Third Avenue Seattle, Washington 98121 (206) 623-0331 10 April 1984 Mr. Hal Reeves Building Department Edmonds Civic Center 250 Fifth North Edmonds, WA 98020 Re: City of Edmonds Sign Support - Better Hcmes Architect: Paul Z. Wu Engineer: V.L. Lindberg, P.E. Dear Mr. Reeves: Go - 8422 We have reviewed the structural calculations and analysis on the subject sign support and do not take any exception to the design as presented. * Very truly yours, W J A Architects, Engineers Planners /,..'Jack H. Whiteley, P.E. President V.L, LIN015P,'14 MANNINI&I 3 OWN 4.2-013 -* -zs'- -2 " 71�7,7` A t w 4F 'S�o r5L - 0 -Fo-L4N0&TlUtA WT = 3x tsz)yao zr_ is, 00c) I L -.4- + rz. = 71 -:�):5 b \ 6. W t4, AU-0WABLE SOIL SEAR, I -tt "tl r- v 12� Mn I rl Z-Aj LLO�-*J O-C, )� f-)( & Q ACT. 00 0 mct K AUOA SAFTY F ACIORL = A- '41 CA,LCS. CO Nt T, �MAY, TKE-5 S I N Z� C-0 i-.S I (2.A 7 -7- .,1 3 550 Z.0,— 7 10,4 --3 65 17 :i�( 3� 57 t_AN y, I F-Dwoko-5 Wi; (Zl.'S CQL_ k a t,.i 5 J=OR I C-1 N SLApPOIZ7 Ca LA em �i -5 /A N v F� N D/N-T' 10 N S AT A, "-'5 k Cn N D es 16-1 k Z, F-S I Crt N WIND MPI,-k MAX 4. Dx5 i ec-iv,� kNIND PRCLSSWRE FO)z 1-�5 -1-%A&I B(JFr, H. E ( C-t �+,7- -se-o tq e 79 AssLIMPTION L4,rr-;9,AL- SOIL- SeARJN& PRESSUIZZ 2, N. T-L coi-WMN5 C-A'5T Dlgf---CTL� INrO CoNC&F-7-lz- lrow/vDATIONs S�WF- Rk C-TOR ON -51604 C4)lLt*l1Vl5 160 5. ONLY Wr. oF- POUNDATION WIL.L 5E- L45ED P-4 CA L-cs Tb P R E V G: 0 V TQ R- N i N C-1 (Po"NONTION Sol,- Bc-Apoq 61) it SICmN AREA 1 0 -= .4 LoAc) oN N 2-5 '/�t '3- 0 9 C--T--FF-c-r(vr-- MwAeNr ARK 2- .7 ZO.2 4LI L LOAD ON COL. 'Ila EF--i�Ec-riQE MoMENT ARM Z I il� V. L r- M AN N I N Cl F. ...... . cc) 14 C L- Q -s t C) N1 ANU I'l vil-VIA 0 N S- 1. Z. C4 LCS" TvAe- 7UzllakN LAWDE-p- CON011-ION-5 k4A,;' A t6A F L---r'*y PACM'l 0 F7- MAO F. ACCL-p4a�le Iiw4 t; I N &f "IJ I LILL: 1--c' kk AJ ix-f l'oii tiOQ I 'T'I 0 N A L t5� 4�ACC A P, F, A I �. ) ApPF--D 4M -rW-C- "i�,14iN , ADDITION f--c) W K( C)A-T-Iot,4 W ILL BEE r-), E - 0 'Q C- 0 L�-\ WA5 14 k C-lv-aje have QN le: ,5 a t- e Ty- gj�o r- CE AIP LU 14- U Acr-omoPA-Y'C' AN ADDI-r(oN14-L I'NcRF-ASr:-. IN AR-IFA IF- DF-SIREP. N�O VA - TECH ENGINEERING , INC. 115 - 2nd AVENUE NORTH, EDMONDS. WASH. 98020-3101 VERNE L LINDBERG Registered Engineer Bus. (206) 775-4469 Res. (206) 337-3853 L- L w 089 5 QlSTf- ZONA CITY OF EDMONDS LARRY S. NAUGHTEN MAYOR 250 5th AVE. N. * EDMONDS, WASHINGTON 98020 - (206) 771-3202 BUILDING DIVISION May 24th, 1985 Better Home Systems, Inc. 13550 Aurora Avenue North Seattle, Washington RE: Performance Bond .23005 Highway 99 Edmonds, Washington Bond Amount $9,200.. Permit #840173 The City of Edmonds hereby releasesthe performance bond in the amount of $9,200 for work completed at 23005 Highway 99 in Edmonds. The project has been completed to the satisfaction of the City. - Z'-t� Jeannine L. G= t6 _-7 Permit Coordinat r Enclosure ja 0 0 'Better Hofaes 13550 Aurora Ave. N. Systerns, Inc. Seattle, Washington 98133 King Co. 367-7766 Snohoniish Co. 259-0555 CUSTOMER Better Homes Systems, Inc. 13550 Aurora Ave. North eattle. Washin2ton 98133 0 IN'VOICE, INVOICE NO. DAT E ACCOUNT NO. YOUR P.O. NUMBER TERMS SHIP VIA FOB SALESMAN OTY. UNIT DESCRIPTION UNIT PRICE AMOUNT 2 Pave aprons on Hwy 99 as per drawing f3 Q� 0 1 One on 230th Street as per drawing 1 Install curbs, outters, and 5' sidewalk along Hwy 99 on property line as per drawing 1 Clear and gravel site as per drawing 0 G 1 Plant shrubs and grass as per landscape plans '3,6 0 C% 0 PLEASE PAY FROM THIS INVOICE SUB TOTAL TAX TOTAL PIPF.,m- 116 BeaerH S 1 13550 Aurorma Afv 4' Seattle, Washington 98133 King Co'367-7766 Snohofftish Co. 259-0555 CUSTOMER Better Homes Systems, Inc. 13550 Aurora Ave. North Seattle, Washington 98133 INVOICE VOICE NO. DAT E ACCOUNT NO. YOUR P.0 NUMBER TERMS SHIP VIA FOB SALESMAN OTY. UNIT DESCRIPTION UNIT AMOUNT PRICE 2 Pave aprons on Hwy 99 as per drawing r3 lb C3 1 One on 230th Street as per drawing �& 1 Install curbs, gutters, and 5' sidewalk along Hwy 99 on property line as per drawing I&C I Clear and gravel site as per drawing 1 Plant shrubs and grass as per landscape plans T t)�' PLEASE PAY FROM THIS INVOICE IS* 9 0c) SUBTOTAL TAX TOTAL PIPF-e 116 D S A,,s TEYRiNq SS( SSOCIATES, INC. (206) 778-3101 23423 Highway 99 Edmonds, WA 98020 P.O. Box 32 Lynnwood, WA 98036 The following represents the property on 230th SW and Highway 99, per the attached sketch. Parcel A All that portion of Tract 14, plat of Skelton's Lake McAleer 5 Acre Tracts, per the plat as recorded in Volume 6 of Plats, page 21, records of Snohomish County, Washington, described as follows: Beginning at the intersection of the East line thereof and the Easterly margin of the Old U.S. 99 Highway; thence S 0*44'38" E along said East line, a distance of 218.01 feet; thence N 64*16' W along a course thatis perpendicular to the said Easterly margin of old U.S. 99, a distance of 97.20 feet to a point on said Easterly margin; thence along said Easterly margin N 25*44' E, a distance of 195.14 feet to the Point of Beginning. Parcel R All that portion of Tract 15, plat of Skelton's Lake McAleer 5 Acre Tracts, per the plat as recorded in Volume 6 of Plats, page 21, records of Snohomish County, Washington, described as follows: Beginning at the intersection of the North line thereof and the Easterly margin of the Old U.S. 99 Highway; thence along the North line thereof, N 89*37'38" E, a distance of 205.0 feet; thence S 0143137" E parallel with the East line thereof, a distance of 279.0 feet; thence parallel with the North line, S 89*37'38" W, a distance of 218.18 feet to an intersection with a line that is perpendicular to the said Easterly margin of Old U.S. 99; thence N 640161 W, a distance of 15.72 feet to a point of intersection with the West line of said Tract 15; thence along said West line, N 0*44'38" W, a distance of 218.01 feet to a point of intersection with the Easterly margin of Old U.S. 99; thence along said Easterly margin, N 25*44' E, a distance of 61.3 feet to the Point of Beginning. 2/20/84 0001�e�. 777? /It /-5' -31 -5-Ale CIO, 23423 Highway 99 Edmonds, WA 98020 0-1, .0. Box 3 2 Lynnwood, WA 98036- 778-3101 MEI�RINIIJ & ASSOCIATES,*. Registered Land Surveyors and Engineers 23423 HWY 99 - EDMONDS, WASH. 98020 LAND S4RV-EYS SANITATION REPORTS LAND PLANNING FOREST ENGINEERING PLATTING DRAINAGE PLANS (206) 778-3101 M.B.MEYRING P.O. BOX 32 A.CHENOWETH LYNNWOOD, WASH. 98036 TO Cindy Ringstad Edmonds Building Dept. 250 5th N. Edmonds, WA 98020 C r_ LETTER OF TRANSMITTAL OAT E 4/12/84 1"0" NO84-022 ATTENTION RE: Ur-IIJ I L IVI IN: WE ARE SENDING YOU Ck Attached 0 Under separate cover via 0 Material Submittals 0 Prints C3 Plans 0 Copy of letter 0 Change order El 0 Specifications - the following items. 0 Color Samples COPIES DATE NO. DESCRIPTION 2 4/4/84 Better Homes Systmes Inc. Drainage Control Plan THESE ARE TRANSMITTED as checked below: 0 For approval [3 Approved as noted 0 For your use 0 Returned for corrections 12 As requested 0 Approved as submitted 0 For review and comment 0 0 FOR BIDS DUE REMARKS COPY TO C3 Resubmit - copies for approval El Submit copies for distribution 0 Return corrected prints 19 - C1 PRINTS RETURNED AFTER LOAN TO US SIGNED: Rosemary Lowman If enclosures are not as noted, kindly notify us at once. For stefs EYRiNq SS()CiATES, INC. 23423 Highway 99 Edmonds, WA 980.20 (206) 778-3101 P.O. Box 32 Lynnwood, WA 98036 May 25, 1984 Jim Adams Edmonds Public Works 250 5th Avenue Edmonds, WA 98020 Re: 230th St SW & Hiway 99 Dear Jim; Reconsideration of the composition of the surfacing and the over-all operation,.it is my opinion that an oil separator will not be necesaary as shown on the original drainage plans for Better Homes. Sincerely, M. B. Meyring, P.E. MBM: rl e A I-S�2 � 7 81,�, ..... . . 44-(,k�j- 7 1018 PUBLIC UTILITY DISTRICT No I of Snoboml -Area T C REV. WO I _�un I ty q4;A Til 0 IN, 0. DATE WO. N I r-21 -ASON FOR WO REVISION J013 NO. =7=Tmmd _;.z Mae ENGINEER U.G. FILE No. DRAFTER SCALE APPROVALS ERMIT REO ype EASEMENT OREOUIRED ONOT R ED OTREE TRIM.ING " " G ODIAL DIG OWAT L'W SEWER )ATE GRANTED 0 Pua- ATCR j8;'ACK HOE 0 GAS 0 0 DATE RFLEASED ES REQUIRED YE57ft� 00__ 'PE 4uK-_,Ou FOREIGN CONTACTS G T N W NO POLE STENCILING FROM _ To ATE A___" ��� TAKE OFF POLE 3STATION ,JE WORK COMPLETED CIRCUIT NO — BY — , It ;r ( D=l Lj -1 >< T_ ic. 56 400 le�c I c� -r-, �07 'a. z e6c- 2 2 El 2 (40,vr—NN A P. %W/ 25 T H ST- —<.\AJ. ENVIRONMENAL ANALYSIS P, T � gNOT EXEMPT PARA. ITEMC.1- 0. H. U - G. CON D _K V ADD _CKT. FT_PH, REmV. - CKT FT. -PH. NET _CKT. FT. G. FOREMAN TRANSF CARDS I ICIRr POLE DEPT DATE PRINTED c 0 I tj !�_;r 3 It 42 1 SC9— C) N -z4::4 :F_;;,c50tAc" (::7,- CAN DISPATCHER POSTED MAP PAGE WO., NO. PC) L.3F, IPO L_ C___ -1-C CITY OF EDMONDS File NoW— 7— 5;;q EDMONDS, WASHINGTON DatE Fee APO's APPLICATION TO HEARING EY.VINER Rect. No.'122�3 FOR CONDITIONAL USE PERMIT HEARING PATE 311, 5 - / 5 �'4 Better Homes Xq!a550 Auror-g-'AVe'. N I APPLICANT:Sy stems Inc . ADDRESY tle,WA PHONE 367-7766 Indicate type or degree of interest in the p leasee t7(, T-, kson OWNER: Will Shiomi ADDRESS RON *1241 PHONE :3 1-3--7 3 1--) C) - =-,F 0 C, r b, Z"-.7-7 A V� -7 / I LOCATION OF PROPERTY (ADDRESS) '�Oth . W. and Hwy4p(address not issued) LEGAL DESCRIPTION OF PROPERTY North Westerly portion of Lots 14 & 15 of Skelton's Lake McAleer 5 Acr-L-s Tracts (approx. 1.69 acres). .0 Correct description of leased portion by Meyring Surveyors,Inc. to be submi-- To be completed by the Planning Division: Use Zone ted by Legal description checked and approved by: Date: 2/24/84. VICINITY SKETCH: Example: sue�.)rLcr PLEASE SHOW BELOW A.VICINITY SKETCH AS PER EM-11PLE, INDICATING NORTH. 2 -> V &J E�,T- KC)PE-V CON'�PITIONAL USE REQUESTED: uuTcioor �iTorage use DETAILS OF PROPOSED USAGE: Retail Sales Office; sales and display of manufactured homes. � � �� �,, I -Tqk C', Signature of Appri—cant, Ounier or Representative RELEASE/HOLD HARMLESS AGREEMENT The,undersigned applicant, his heirs and assigns, in consideration for the City processing.the application agrees to release, indemn.ifv, defend and hold the City of Edmonds har-mless from anv and all damages and/or claims for damages, including reasonable attorneys' fees, arising from anv action or inaction of.the City whenever such action or inaction is based in whole or in part upon false, misleading or incomolete information furnished by the applicant, his agents or employees. PERMISSION TO ENTER SUBJECT PROPERTY The undersigned applicant grants his, her or its vermission for public officials and the staff of the City of Edmonds to enter the subject propertv for the purpose of'insDection and posting attendant to this application. A I �� �Iao -�— Sigftture ot ApDlicant, Mner or Revresentative 0 ENVIRONMENTAL CHECKLIST A. BACKGROUND 1. Name Proponent of Better Homes Systems, Inc. 2. Address and Phone Number of Proponent 13550 Aurora Ave u- 1\ th Seattle, WA 98133 (206)367-77 7 3. Date Checklist Submitted 2/16/1984 4. Agency Requiring Checklist City of Edmonds, Edmonds, Washington 5. Name of Proposal, if applicable NIA 6. Nature and Brief Description of Proposal (including but not limited to its size, general design elements, and other factors that will give an accurate understanding of its scope and nature: To improve and develop the property (1.69 Acres) for use as retail sales & display center for manufactured homes. 7. Location of Proposal (describe the physical setting of the proposal, as well as the extent of the land area affected by any environmental im- pacts, including any other information needed to give an accurate under- standing of the environmental setting of the proposal): The proposed site is located on Hwy 99 and 230th St. S.W. .Edmonds, WA. The site is Presently unimproved, situated in a developed business community. The proposed site for development contains 1.69 acres; the site is relatively flat, with minimal growth of�low brush, weeds dLA I I 1P Xrj8 L)f WaZ-UL—=teLtU1:. & unauthorized 8. Estimated Date for Completion of the Proposal 4/15/1984 9. List of all PerTnits,,Licenses, or Government Approvals Required for all Proposal (federal, state, and local — including rezones): City of Edmonds Conditional Use Permit (for outdoor storage) Sign Permit, Building Permit, State of Washington Manufactured Housing Dealer's License, City of Edmonds Architectural Design Board Review & Approval. * 10. Do you have any plans for future additions, expansions, or further activi_ty related to or connected with this proposal? If yes, explain. No. Do you know of any plans by others which may affect the property covered by your proposal? If yes, explain. No. 12. Attach any other application form that has been completed regarding the proposal; if none has been completed, but is expected to be filed at some future date, describe the nature of such application form: Sign Permit. Architectural Design Board Review Application -I- 0 0 B. ENVIRONMENTAL IMPACTS (Explanations of all "yes" and "maybe" answers are required). YES MAYBE NO Earth. Will the proposal result in: a. Unstable earth conditions or in changes in geologic substructures? b. Disruptions, displacements, compaction or overcovering of the soil? V c. Change in topography or ground surface relief features? d. The destruction, covering or modifica- tion of any unique geologic or physical features? e. Any increase in wind or water erosion of soils, either on or off the site? V f. Changes in deposition or erosion of beach sands, or changes in siltation, deposition or erosion which may modify the channel or a river or stream or the bed of the ocean or any bay, inlet or lake? V Explanation: A portion of site (fronting Hwy 99) will be graded 2. and graveled. Remainder of the site will be cleared of existing unwanted vegetation and waste material (unauthorized dumping), ei The evergreen trees on the site will be protected and incorporated in the landscaping treatment. Air. Will the proposal result in: a. Air emissions or deterioration of ambient air quality? b. The creation of objectionable odors? c. Alteration of air movement, moisture or temperature, or any change in climate, either locally or regionally? Explanation: _N/A V V V 3. Water. Will the proposal result in: a. Changes in currents, or the course or direction of water movements, in either marine or fresh waters? V b. Changes in absorption rates, drainage patterns, or the rate and amount of sur- face water runoff? V -2- 0 0 YES MAYBE NO c. Alterations to the course or flow of flood waters? V d. Change in the amount of surface.water in any water body? V e. Discharge into surface waters, or in any alteration of surface water quality, including but not limited to temperature, dissolved oxygen or turbidity? V f. Alteration of the direction or rate of flow of ground waters? g. Change in the quantity of ground waters, either through direct additions or withdrawals, or through interception of an aquifer by cuts or excavations? h. Deterioration in ground water quality, either through direct injection, or through the seepage of leachate, phosphates, deter- gents, waterborne virus or bacteria, or other substances into the ground waters? V� i. Reduction in the amount of water otherwise available for public water supplies? V Explanation: N/A 4. Flora. Will the proposal result in: a. Change in the diversity of species, or numbers of any species of flora (in- cluding trees, shrubs, grass, crops, microflora and aquatic plants)? b. Reduction of the numbers of any unique, rare or endangered species of flora? c. Introduction of new species of flora into an area, or in a barrier to the norma-1 replenishment of exist- - ing species? d. Recution in acreage of any agri- cultural crop? Explanation: Existing growth of weeds and low brushes will be cleared. Landscaping treatment will be used to upgrade the site conditions. -3- 0 5. Fauna. WIll the proposal result in: W a. Changes in the diversity of species, or numbers of any species of fauna (birds, land animals including reptiles, fish and shellfish, benthic organisms, insects or microfauna)? b. Reduction of the numbers of any unique, rare or endangered species of fauna? c. Introduction of new species of fauna into an area, or result in a barrier to the migration or movement of fauna? d. Deterioration to existing fish or wildlife habitat? Explanation: N/A Noise. Will the proposal existing noise levels? Explanation: N/A increase YES MAYBE 'NO V V 7. Light and Glare. Will the proposal produce new li�ht or glare? V Explanation: Minimal amount of site security lighting will be installed, in addition to the lighted sign in conformance with the a City of Edmonds requirements (Ch.20.60). Land Use. Will the proposal result in the alteration of the present or planned land use of an area? Explanation: NIA 9. Natural Resources. Will the proposal result in: E a. Increase in the rate of use of any natural resource? V. b. Depletion of any nonrenewable natural resource? V. Explanation: N/A YES MAYBE NO 10. Risk of Upset. Does the proposal involve a risk of an explosion or release of hazard- ous substances (including, but not limited to, oil, pesticides, chemicals or radiation) in the event of an accident or upset condi- tions? V Explanation: N/A 11. Population. Will the proposal alter the location, distribution, density, or growth rate of the human population of an area? Explanation:—N/.A 12. Housinq. Will the proposal affect existing housing, or create a demand for additional housing? Expl anati on: _N/A 13. Transportation/Circulation. Will the pro- posal result in: a. Generation of additional vehicular movement? b. Effects on existing parking facili- ties, or demand for new parking? c. Impact upon existing transportation systems? V d. Alterations to present patterns of circulation or movement of people and/or goods? e. Alterations to waterborne, rail or air traffic? f. Increase in traffic hazards to motor vehicles, bicyclists or pedestrians? Explanation:- On -site parking will be provided for customers. Based on present customer counts, a total of 12 stalls will be able to accommodate the projected parking needs. No significant increase to the traffic counts on hwy 99 is anticipated. 5.11 4 14. Public Services. Will the proposal have an effect upon, or result in a need for new or altered governmental services in any of the following areas: a. Fire protection? b. Police protection? c. Schools? d. Parks or other recreational facilities? e. Maintenance of public facilities, including roads? f. Other governmental services? Explanation: N/A YES MAYBE NO V V V V V/ 15. Energy. Will the proposal result in: a. Use of substantial amounts of fuel V or energy? b. Demand upon existing sources of energy, or require the development V of new sources of energy? Explanation: N/A 16. Utilities. Will the proposal result in a need-76'r new systems or alterations to the following utilities: a. Power or natural gas? b. Communications systems? c. Water? d. Sewer or septic tanks? e. Storm water drainage? f. Solid waste and disposal? Explanation: Existing -systems will be able to accommodate all our utilities needs. -6- YES MAYBE NO 17. Human Health. Will the proposal result 3—n-the creation of any health hazard or potential health hazard (excluding mental health)? Explanation:— N/A 18. Aesthetics. Will the proposal result in the obstruction of any scenic vista or view open to the public, or will the proposal result in the creation of an aesthetically offensive site open to public view? Explanation: - The proposal will substantially improve present site conditions. 19. Recreation. Will the proposal result in an impact upon the quality or quan- tity of existing recreational oppor- tunities? Explanation: N/A 20. Archeological/Historical.. Will the proposal result in an alteration of a significant archeological or his- torical site, structure, object or building? Explanation:— NIA C. SIGNATURE I, the undersigned, state that to the best of my knowledge the above information is true and complete. It is understood that the lead agency may withdraw any declaratio: or non -significance that it might issue in reliance upon this checklist should there be any willful misrepresentation or willful lack of full disclosure on my part. %44Aec �A(.Nv_a4 S'y3-JqmS- PROPONENT: /—k "M-4- — i C -V August 20, 1975 MEMO TO: Harry Whitcutt Building Official E. Joe Wallis S r)76 City Planner FROM: Leif R. Larson City Engineer SUBJECT: Fill Permit Application Connor Sales at 23005 Highway 99 A review of the plot plan and profile drawings submitted by Meyring & Associates shows the proposed fill slope near the existing drainage system east side exceeding the maxi- mum allowed by the Building Code. All filling and sloping shall conform to Section 70 of the' . Building Code. Fill slope two horizontall to one vertical. LRL:WJN:rf cc: Board of Adjustment I October 1.2, 1967 Mrs. Josephine Hood 23005 lligyhway 0.9 Edronds, Washin7ton 98020 Dear Nrs. hood: XX Pursuant to your request by',et ,�d ��T,,,dlated September 27, 1967, 0 for an extension of tire in which t o ri ycur residence to the sewer k��-,nsi or, '1r, n system, permissiri-, fcr. an e hcb�hy i7vantee,.. fac This rlsvision i's, bcscC� on t4e, . t that the house is ever 200 feet from a sewer and the, pronerty wlj� probably be sold and utilized com-ercially. YourG very truly CITY OF EDMONDS JOHN 1% 190RAli Directo- of Fuhlic Works JUT:ek City of Edmonds Buflding Department A?PROVED PLAN O'REILLY AUTO PARTS INTERNALLY ILLUMINATED 20' POLE SIGN 6'-3" X 12'-6"0'REIUY S16N DOUBLE -EMBOSSED & DOUBLE-FACED 12'-ro'll ITY Off EDN40NDS 8 DINGIDEPARTIVIENT WORK ADDR S OWNE APPROVED BU)G OFFICIAL PER L NUM13ER �_/,l 7-9— STREET F 78.125 SQ.FT. USUD� ALUTMWUYI� ' AMP5 OP- 1.20 WA-"S rWoqc_sck,p,rT LAWI'P3 .1 The timer controlling sign illumination shall be set to turn thesigns off at 11:00 p.m. or whenever the business closes for the day. I r1u, GAS - CIO 75 & 2-ff RECEIVEI� DEC 28 2011 1 DEVELOPMENT SERVICES CTR- CITY OF EDMONDS 0 -�N �7 :7. LEGAL DESCRIPTION. LOT INFORMATION: PARKING INFORMATION App"o AS jVOTED By 11ANV; IIVG ire? 7 71 V.- SITE DEVELOPMENT PLAN OWNERICONTRACTOR IS RESPON,1311, r- FOR 1 EROSION CONTROL AND DRAINAGE OAW.J,., a, q�ow& SYMBOLS LEGEND amm . . . . . . . - - - - - — - KEY NOTESt 6v� -1*4 b 0 PALM WIM AL pf Z%nl "--�,A-s ftew SK)CC PA. .-?—"LS—ON T 'WALT. jESSAk at �m CUPAIANTS: cri r1ccIM& IM NIM-11-1 ;P't. a sc� A t;g '4H 0, s4la 711tri S.Tr o9vue"My MAN C", VATiON WEST ELF A.3 At . ............. SOUTH ELEVATION ..lvMllFlF-llV_ *r1b"MIN" FAST BLEVATION k�A ... ........... . .......... NORiiiiii4iiiON kj!.) GENERAL NOTES: KEY NOTESs cl) ®R ou MCAMMU k'__ 4- mm- VENT PIPE k #a 0-� wamms m of m9=11MAWAOMPIA" MMML, W'' M. P-ma a- 0 A wm'", IDA._ EXTERIOR FINISH SCHEDULE PAW mm'. "'Ovwu �lwal ........... wri.4 Aww-.-M__ 04 ----- — Q%"k mw. cvvpl =Mxl 2A. ps. w1r. HAM vs IOU a : 41 tk"1410- J3#-N: N �wv�lsl mp Vg x '. z a ;iltcr bitil �!rmm IKVW*bt! VIL ....... ..... .. . . .... ..... A3 _. w. �t mi. v^,^ pw A �' & 4 #A - Side View '��-rg-Relllycabinet 5'-8 114" (q-� Side View � �-Aum �PARTs" ietters 7;r ... ..... 112- MATERIALS USEZ)', ALL- AWM'Wun'� C-O'N5Tp-Qc 'Rok WAITACnF—'- i AmP op- Cob LcA-iT;S CJG M C--, 0 M -q 0 W co m 49" OR cloud and 17" Auto Parts R Scafe: 3/8"= V-0" m 0 I of 1 27'-Y2' U JI 0 ReI* I Mv@ Aline to bottom of black outlines. side View r,-\Elevation-Fmnt Part# 49/23L-CL&CL Ru v (�)—O'Reillycabinet Scale: 1/4" = V-0" 70.5f—sq.ft. friATMIAU� 03E�16 - NL k-ANMNUM Cp.wSTVJ�00 �,,Axtpku . I arnp &a. 6o wAITS !2 .2 AMPS rJL i 2—C, L,,jdTTS C--) 0 C'n, vz) M 49" OR and 23" Auto Parts 0 Co con M 0 Cn 9; !Ei 0 Side View �'AUTO �PARTS" �Iefters Q�W Scale: 1/4"= V-0" 10fl 9 . 4 , , TRIM 318"W 4* LETrl GLAS: ow Phon&42& 33 0.8160 Foic425.337.0150 SCHEDULE (�) CHANNEL LETTERS ON A RACEWAY EXISTING WOOD uSTMDMDO STRUCTURE 5.50 W/ FACE (END MEW) 711 RACEWAY r FLEX CONNE6TORS RANSFORIVIER iRACEWAY RECEIVED DEC 28 2011 DEVELOPMENT SERVICES CTR. C17Y OF EDMONDS TWS DESIGN 15 THE EMIWM PROPEM OF Localbn: Custornm Approvd: we: BUTANDISPROTeCTEID BY FEDERX COPYMW LAM. ANY REPRM=M OF A SIGN SWARTO THE Deagw. AW m Nmw. DEEM REPRESENTED HERE IS FORBIDDER. SHOULD THIS OCCLOt. BUT ts OLE 32DODA AS COMPENSATWX Prolwal REP: Date: Lcrtcgmd Approvd: Datu. FOR CREA�M OF SM DEMOM C 12'-6" 3 RINGS ON SLEEVEINTO POLE 5'x5'SQUARE Phone: 425.3 30. 8 160 Fax., 42 5 . 3 3 7. 0 15 0 RESUB FEB .16 2012 BUILDING DEPAR7MENT CITY OF EDWNDS STREET FILE- 311d 133819 Crff COPY I" "Nothing in this permit approval proem shall be. interpreted as allowing or permitting the maintenance of any currently exi" illegal, nonconforming or unpermitted building, structure or site condition which is outside the scope of the permit application, regardless of whether such building, structure or condition is shown on the site plan or drawing. Such budding, 8tru#m or condition may be the subject of a separate enforcement action." j FINAL ENG.INEERING-REPORT', (DrainAgp Calculaflons) FOR O'Reilly Auto Parts 23005 Highway 99 Edmonds, Washington September 2011 APP BY RMW j Revised 9-20-11 1."'INEERING jDate: 38508 ST Ki 1.40 Prepared by: Robert L. Long Lovell-Sauerland & Associates 1h 19217 36 . Avenue W. Suite 106 Lynnwood, Washington 98036 LSA No. 5331 RECEOVEF0,` SEP 2 12011, -DEVELOPMENT SERVICES CTR. CI1Y OF EDMONDS 6TREET FILE FINAL ENGINEERING REPORT (Drainage Calculations) ITUN O'Reilly Auto Parts 23005 Highway 99 Edmonds, Washington September 2011 Revised 9-16-11 313508 L Prepared by: Robert L. Long Lovell-Sauerland & Associates 1921736 1h Avenue W. Suite 106 Lynnwood, Washington 98036 LSA No. 5331 O'Reilly Auto Parts 23005 Highway 99 Edmonds, Washington Introduction This summary report provides site design information for the proposed development for O'Reilly Auto Parts, 23005 Highway 99. It includes storm drainage analysis to support permit review and approval. The property is located at on the east side on Highway 99 just south of 23 0 'h St SW in the northeast 1/4 of Section -3 ) 1, T 27 N, R 4 E, W.M. Site Address: Tax Parcel Number: 005767-000-014-00 2-3005 Highway 99 Edmonds, WA TABLE OF CONTENTS SECTION PAGES A. Project Summary ................................................................................................................................ 5 B. Parcel (Vicinity) Map ........................................................................................................................ I C. Site Development Plans .................................................................................................................... 10 D. Aerial Photo ........................................................................................................................................ I E. Stormwater Control System Summary and Calculations ................................................................ 13 F. Drainage Basin Description and Maps .......................................................... .................................... 3 G. Grading and Erosion Control Summary and Soils Map .................................................................... 3 H. Geotechnical Engineering Report ................................................................................................... 29 1. Operation and Maintenance Guidelines .............................................................................................. 9 Lovell-Sauertand and Associates O'Reilly Auto Parts Final Engineering and Drainage Report 23005 Highway 99 LSA No.5331 September 2011 PROJECTSUMMARY. This report provides engineering information for the proposed construction of the O'Reilly Auto Parts- 32005 Highway 99. The project is located on the east side of Highway 99 and south of 230"' St SW in the City of Edmonds. The applicant proposes to construct a 7,500 sf auto parts store oil the 0.997 acre site. Infrastructure improvernents include a existing access to Highway 99 and a new access to 230"' St SW; internal site driveway and parking; stormwater conveyance, control/infiltration and treatment; water; sewer; power; and communications. A full overview of the proposed storm drainage control facilities, offs i te/downstream analysis and grading and erosion control measures are discussed in the following sections of this report. Existing Conditions. The total site consists of about 43,429 sf (0.997 acres) and is currently occupied by two modular building (previously retail business selling pre -manufactured sheds), a paved/gravel parking lot and surrounding landscape vegetation. At the time of this report the retail business oil site appeared to be vacant for some time and tile landscape and vegetation on site has not be maintained. The site is bordered by a mini -storage facility on the east, a access driveway to the min -storage facility on the west boundary, H ighway 99 right-of-way to the west, and 230"' St SW right-of-way to the north. The access to/froin Highway 99 will be maintained and a new access point to/frorn 230"' St SW will be added. The site generally slopes from the southwest to northeast in an average grade of 4% to 6%.. The westerly portion of the site contains a slope that drops down about 6 feet to mini -storage facility to the east. Stormwater run-off from the site sheet flows in a northeasterly direction towards 230"' St SW or the adjacent mini -storage facility with no signs of a defined channel. No stream or wetlands were discovered on or immediately adjacent to the site. Additional discussion of the local drainage basin and downstream path is discussed in section F of this report. Developed Conditions. The proposed project includes the construction da 7,500 sf auto parts store with an associated parking and driveway. Frontage improvements currently exist along both of the site's frontage on Highway 99 and 23 61h St SW. The access to/frorn Highway 99 will be maintained and a new access point to/from 23 01h St SW will be added. Nearly all existing vegetation will be removed during grading activities in the development area of the site; landscaping and grass lawn around the new auto parts store building and parking lot will stabilize the site upon building construction. New infrastructure improvements include a driveway/parking area, new access to 23 01h St SW; stormwater conveyance, detention and treatment filter; water; sewer; power; and communications. Due to the existing till soils of the site no infiltration or low impact development technique are proposed. To control the stormwater runoff a detention tank will be installed in the northeast portion of the site, just east of the proposed new access to 23 01h St SW. All roof drains and runoff flows from the driveway area shall be routed to the proposed Aetention tank. Downstream of the detention tank is a stormwater filter system that will provide water quality treatment and phosphorus removal. See section E for additional evaluation of the storm drainage control system. Lovell-Saueriand and Associates O'Reilly Auto Parts Final Engineering and Drainage Report 23005 Highway 99 LSA No. 5331 September 2011 Aq Summary ofMinimum Requirenientsfor Small Site Projects: 5.1 Small Site Minimum Requirement #1 — Preparation of Stormwater Site Plan The proposed site development consists of.disturbing about 0.997 acres of land and creating about 29,100 sf of impervious surface. Thus, the project is classified as a Category 2 Small Site Project per the City's classification system. The civil site development plans have been prepared and reduced copies of the plans are included in section C of this report. 5.2 Small Site Minimum Requirement #2 — Construction Stormwater Pollution Prevention A summary of the site's grading and erosion control are included in section G. The grading quantities are estimated to be 770 CY of cut and 762 CY of fill (per CAD surface modeling by others). The total site disturbance area of the project is less than one acre, thus a formal Notice of Inient application for NPDES coverage will not be made to tile Department of Ecology. Included in the civil site development plans is a grading plan with erosion control BMPs and notes. 5.3 Small Site Minimum Requirement #3.— Source Control of Pollution No extraordinary measures are required for the proposed development (auto part's store) of the site. The site will include oil/water separator tees within the collection catchbasins onsite to control oils from vehicles visiting the site. Post detention a stormwater filter system designed to provide basic treatment and phosphorus control will be provide and are summarized in section E. Stormwater Control System Suniniary and Calculations. Additionally, O'Reilly shall post "No working on vehicle signs" oil building to reduce the illicit discharge of pollutants from vehicles in the parking lot. 5.4 Small Site Minimum Requirement #4 — Preservation of Natural Drainage Systems and Ouffalls A majority of the runoff leaves the site as sheet flow in the northeasterly direction with no well defined drainage path. The proposed detention system will discharge flows to the storrn pipe system in 23 01h St SW, thus maintaining the northeasterly flow discharge. The site is located in the Halls Creek watershed basin per the City of Edmonds maps. The proposed development will maintain the stormwater flow discharges to the Halls Creek watershed basin. 5.5 Small Site Minimum Requirement #5 — Onsite Stormwater Management. The developed site conditions include impervious surface roof top, driveway, walkways and parking areas for the proposed O'Reilly Auto Parts store. A system of catchbasins and pipes has been design to collect and convey stormwater run-off to the on -site drainage control facilities. Due to the underlying dense till soils (see attached geotechnical report) found onsite, no LID or infiltration type stormwater management systems will be used onsite. An underground detention tank system per the City's drainage manual will be provided to control stormwater quantity control. See civil site development plans for construction details. 5.6 Small Site Minimum Requirement #6 — Runoff Treatment. The project proposes to create/replace more than 5,000 sf of pollution -generation impervious surface with the installation of the driveway and parking lot area (21,600 sf). Additionally, the site is located within the Greater Lake Ballinger Watershed Lovell-Saueriand and Associates O'Reilly Auto Parts Final Engineering and Drainage Report 23005 Highway 99 LSA No. 5331 September 2011 A-2 (Halls Creek watershed drains to Lake Ballinger), thus basic water quality treatment and phosphorus removal is required for the pollution generation surfaces. A stormwater filter system downstream of the detention system will be provided. See section E for a full surnmary for storillwater quality treatment and flow control design. 5.7 Small Site Minimum Requirement #7 — Flow Control. An onsite storm detention tank will provide flow control of the site's storrnwater ru noff. Tile detention tank system has been design to meet the flow control standards of a Category 2- Small Site project in a creek or lake basin (less than an acre of disturbance with more than 5,000 sf of impervious surface). Sizing calculations are provided in section E. of this report. 5.8 Small Site Minimum Requirement #8 — Welland Protection. No wetlands.are known to exist oil or adjacent to the site. 5.9 Small Site Minimum Requirement #9 — Operation and Maintenance. An operation and maintenance summary is provided in section 1. 5.10 Small Site Minimum Requirement #10 — Offsile Analysis and Mitigation. See section F. Drainage Basin Description and Maps for a qualitative analysis. 5.11 Small Site Minimum Requirement #11 — Financial Liability. Cost estimates and,bonds will be provided by the applicant during final construction permit approval. Lovell-Saueriand and Associates O'Reilly Auto Parts Final Engineering and Drainage Report 23005 Highway 99 LSA No. 5331 September 2011 A-3 0k: 0410 City of Edmonds 4�� Site Classification Worksheet /1C. Page 1 of 2 The project's Site Classification will dictate the specific stormwater management requirements applicable to your site. Completing this worksheet will help determine the amount of ,regulated impervious surface and whether your project falls into the classification of a Small Site (Category I or Category 2), or a Minor Site. Please reference the Glossary (pp. 10- 10, Figures Q and E, (pp. 8-9), and Examples (pp. 12-13), to assist with completion of this worksheet. 1) Is Permeable Pavement' Proposed For Use on this Site? El Yes N Refer to Stormwater Supplement Chapter 5.1 X If YES, the subject area is to be considered impervious for initial site classification purposes. Include total permeable pavement area in the calculation of Non -Regulated, Replaced and/or New impervious surface areas in the table below. 2) Determine the Amount and Type of Existing & Proposed Impervious Surface for the Site Refer to Stormwater Supplement Chapter 2 and Fig. C Line 1: Identify the Non -Regulated Impervious Surface Area. Line 2: Identify the Replaced Impervious Surface Area, dividing the total between Exempt and Regulated; either or both may be zero. Note: For project classification purposes, Replaced Impervious may only be considered exempt under certain conditions. Refer to the Glossary and Figure D. Line 3: Identify the New Impervious Surface Area for your project. All impervious areas created post -July 7, 1977 or after the date of annexation into the City are regulated & should be included in this total unless they can be categorized separately as a Replaced- Rcgu I ated area. Line 4: Enter the sum of the total Replaced -Regulated plus the total New impervious areas. Line 5: Identify the total area currently mitigated by an existing city -approved stormwater management system. Line 6: Enter the sum of the value in Line 4 less the value in Line 5 to identify the total Regulated area in which stormwater controls have not yet been applied. Line 7: Identify the total area proposed to be mitigated through the use of Low Impact Development Techniques. Line 8: Identify the total area proposed to be mitigated through conventional Stormwater Management Techniques. ** Provide a copy of the following table on the drainage plan sheet for the proposed project ** Line Type Area (square feet) 1. Non -Regulated 0 Exempt Regulated 2. Replaced 0 3. 4. New (Post 1977) 44 44 444 44 Total Regulated Impervious Area Mitigation required if in excess of 2000sf + F ZC1, 00 too 5. 6. Total Area Mitigated by Existing Stormwater Management System(s) Regulated Area Not Yet Mitigated too 7. Area Proposed to be Mitigated by Low Impact Development Techniques 0 8. Area Proposed to be Mitigated through Conventional SWM Techniques I C)O I (e.g. porous asphalt, porous concrete, paver blocks, concrete open cell ed paving grids, or plastic lattices filled with turf or stone) Revised on 4121111 E72-SWM—Erosion—Control-Draft-04.21. I I -FINAL Page 5 of 13 14-4/ City of Edmonds 0V F0,41 Site Classification Worksheet Page 2 of 2 3) Determine the Total Area of Land Disturbing Activity q3AZ!L A Refer to Stormwater Supplement Chapter 8 4) Determine the Quantity of Grading, Fill and/or Excavation Ct4T= 770 CY Fit& r-142 cy 5) Will the project convert 3/4 Acre or More of Native Vegetation to Lawn or Yes No Landscaped Area? X 6) Identify the Watershed the Existing Site Runoff Discharges to Refer to Stormwater Supplement Chapter 2.3 Based on Site Location and Watershed Map — Figure-C. Check all that apply. A. F1 Direct Discharge B.XCreek or Lake Basin [3 Edmonds Way Basin o Puget Sound Basin Ei Puget Sound Piped Basin DETERMINE PROJECT CLASSIFICATION USING THE INFORMATION ABOVE AND THE PROJECT CLASSIFICATION CHART (Figure B, pg 4) 0 Small Site - Category 1 1 mall Site - Category 2 El Minor Site J >I- -4 Stormwater Supplement Stormwater Supplement Stormwater Supplement Chapter 5 Chapter 5 Chapter 6 IRevised on 412 1/11 E72-SWM—Erosion—Control-Draft-04.21. I I -FINAL Page 6 of 13 A-5 DUARTER SECTIOS I TOWNS141P N.W.B.L. RANGE E.W.M. A,�. .1 1k, offic, NE 31 27 4 'Z 04 4-044 27 'Usp 3-026 12 1, 04 15LIS 17 26J,5 m '031 of 105 ii)� -06 0710' -228TH--ST Sw--- r 2 1 03 05 02 02 02; 04 12 Q -028 ,T12 02 04 R Gkl� R 660 2. 3 ---229Tt+STSW----- 3 6 ; 04 -85) 14 3 �4 3 3: olm 06 03 Jr 06 R'W' 26 ' 25 6! 20 19 1 N a / I ! 4 I LAKJ���%. . , 8 SKELTON'S -27124 18 : 15 16 7 2 23 22 17 2 6 28 oil 05 08 ...... . 3 6 05 of o3 2-006 29 30 31 132 1 5 ISITE "1 4 00 7 230TH ST SW- - 19 1 3 1 4 2 11 -- - - 1 2 1 14 13 1 03 04 '1 01 02 20 2 14 02 2 12 3 12 21 o, , 6 5 to 00 - 3 13 CD 3 11 4 13 22 j a 4 05 SP #S 29' �,5�jq j 03 4 12 10 07 5 14 23 - 23 14 A 6 16 02 0' 1 6 15 2 24 5 01 22 - 10 i 6 6 06 12 A of :7 16 . : 25 10� 21 17 LLA AFN 200412105223 (0 04 8 03 P 03 7/ SP 01 9 07 0 'o. i 9 , is 9 12 1 14 1 20 13 iD 0S 9 13 'P6. 16J�17 9 m 02 1 � i . . . __ _ HLIt. Y UIJ (1UY ) -- 10 116/-7';7�) 10 4 1 111 le L=7iAWtf4§ SF 13 15 '�'18 , 7 04 03 17 42) A 6 C C D 6 F 16 18 BREVE 15 6 2 CONDO It f 12f 5 ...... 21 09 21 YREVE ONDO N --1134'...[ 10 4 (10412) 02 -043 4M AVENUE 2 3 g a 13 0 ' ST CON 07L 7 U3 2 2 0 04 06 01 05�. d3 06 IL 04- 6 00 01 08 0 04 Eye ----------- 7�j -234TH- -ST 0 if 04 iO3 06 '08 02'- oi 02 j -,(--04 12 09 03 02 04 2 01 05 07i 13 7 10 29 1 04 3 3 2t- 27 04 20 ...... -134 2�W4 1 06 05 03 9 09 2-049 1: ILER LANE t MOBILE PARK I 9.600-122 --2 H ST-SW- j1'KUIILAN4FAC;H�S TO KE"LLI tR—['A r 7 A 7021 ParcelAW,pini Lovell-Saueriand and Associates Final Engineering and Drainage Report LSA No.5331 LM=W-" � 2-0 -- -239'N(2 ST SW- SP AFN 831 80108 1 i ' 12 07i 08, 09 2 2 9 , ; 3 16 IUf 10' 14 2 4 19 is 20 1 17f, 18 :t 3 1 192! 5 4P &Ck-z) C3 /3 .2W.0 2 17 A 02 of; 04 01 05 11 .04 '03 2 3 5 702 02 902 1002 02 02 03 z� —4- a's 03 04 02 06 _"k jj24 02 IF 9 Mat) 20 05 03 04 20 14 i-- It --- 106 2 05�4 12 1 H 13 09 17 At'-A-- 14 >" 22 —!�— 09 J 19 io 13 f 21 01 ........ 'o. o' 07 O'Reilly Auto Parts 23005 Highway 99 September 2011 C? 01 Re i I I .^--.A.--Y/ ARCHITECT V177 BRUCE M. CARLSON CIVIL ENGINEER W f1N 46 t--..�.—mAUTO PARTS New O'Reilly Auto Parts Store GENERAL NOTES: SR 99 & 230TH ST SW IF��IATE�3���M'�UftMS�tC.���TOT���OA -- FICATION3 AND — ANIC &I OTHER � E 110E.& —S —1. ==CA. ..—. C— -I A STAHOANO MCI— —T—. PATE DEPANTNIENT (V e—OGI STO—A— IANACIEANNT A —IAA — THE — SCAM � N—.I E—) EDMONDS, WA 2 STANO—I � ANCI T— �3 �TED M T­ C—IIIAO3 ­ TO W1 CE CONION13 31— OETAK.& — NOTED v1d%111J1Tv m1kc SHEETINDEX SHEET NUMBER SHEET NWE CO COVERSHEET C, SITE CliACRN6 C SITE DEVELCIEN,IENT KM C3 SU7 DW-W � C� SITE UTUTV PLAIN CS DETAK ce DE T� C7 CIET-S CIE'- C9 T`tv IC C41,NFTRCK. PLAN 01 DEMOLITION ZONING: CONSTRUCTION SEQUENCE NOTES: XACOPT 4X — ANANCY-I—ANASTSE 1, —TECIAS — TNESE ­ � AINA—E-1 TAR —E— NECORO ANDTHE 1--T. — NE-- THE.—ONA OF —6 — -- — �— — -A .1 OF ;V.— .— — I—F— --TE —1 NE. —I IT . THE F OTZ �—= "T VENN" CI` LOCATVONS SHOT— ANO TO AN(I —T.C1 'AN C­TCA � A— LC- _—N—F ON THE. --.. E—. —1 . 4. —TOR � LOCATT AND INACInCT :1 -1 L-11 -11 - 11 -- - "IT C" ..T TCNT — COTART A COPT Of THE —­ R 7 ,==:, — — — — — OAANEIAI 11-11 — ANO — � — To I �3S=E�SCATIC�—ITTRSAAD—E IT—KhRO D ON I -- —1-1 —..T Al INI-1 RE TO — — —FE —=IT. —.I 1 0." =T1'X.T " = E-1 —.Z. E-- —1 — Of 0—.— I T— ­ —0 AN. I- -Im —I—, =,D. NETI U—AA0OTK"R-=X1=NV NBRUCEM. CARLSON 6R`NX.. -- — MCI 219 IT 2NO st S TE 3.1 =CAPOLls. E: W2 'M. 0. m—'s C�AC7.?Uwl "A. 1 o ,--- g C NSULTINTS: 1EI ENGINE RINC. INC. A31. ..0 ou. ASSOCIATES. INC I'll 11 11 — --.1 AN SE- rc I I, 0 V) < 'XI SHEET PIU: COVER SHEET I" S.ONS: NO DATE . ..... ... . ...... .... ....... -.1 . ...... ... co -11 1 0''. I EARTHWORK QUANTITIES. SYMBOLSLEGEND .46 el" c, c 1,10­1 T T1. T� c SITE BENCHMARK: GENERAL NOTES: =T= D 000—f IIONI ITN ITE ­ITEO ­­1 OILIIIOO NE. ON =T­. To. INt ­CILl ­1 TO TI W MI Il=T^=mI Z=T= CONSI—ITON. NOT I-1. KEY NOTES: 6 MRA ­ON-1- Wiftr T& T I= , Al Ll r/ Re4 Pa T­ c. ME GRADING PLAb PON 0", NOTES TO CONTRACTOR: 1.— ­1 .1 .. CONNICTION ­ --ToN II. — I —IN I uc. OONNE­­TO­­ ­OoACL­MlTEMTO5TTr ft­­,WMTO CARLSON SITE EXCAVATION REQUIREMENTS: -�D S.. SUITE MI 1... 511.1 —TO—. ­T­ I To COlIICF j[SVCA TIER ON .—To. OT —TON OE.— T. CT c0­0 IN'S CE- E-C-KEII.O. INC CONSTRUCTION EGRESS NOTES: T= —D ON —II ON ONTO ON To NE O= EROSION CONTROL & MAINTENANCE PLAN NOTES: T Sr.' TI LZJ HANDICAP PARKING DETAIL I T I CITY OF EDMONDS BMP NOTES: TI— E. Lor -ON OONT— C-1 ----Al-$ ..TlCoNT.EN­JNNNS.­­l­ INNTI ­1 ITOO­IoF­OTNrI­lATI­NITl 0 V) TI II— IT— .11 NATINN,l ­1 .-0 — ON NNON. NI 0 z NNONIE­:%4t�.:� ­ft­lj­W­NT OT —TI: 1, —11 1—. T. —11 1. —ON IT AT 1ITC.— oTtrc- SITE OUDINC/TESC PUIN .1 ZE TNEINI OF III6NN ,��D 1—— ­0 ITKINO INO ­D1. III— I— INO I IT ff E­1 1c. NIN ProvoNS Z, I. —No, "A -A" c 1 SECTION "BIB" 11 SITE DEVELOPMENT PLAN LEGAL DESCRIPTION: AS LOT — --.T 1. LOT INFORMATION: PARKING INFORMATION SYMBOLS LEGEND AAA-U,-- 1-T ­ I— KEY NOTES: C) ompim- (D MHuM, 0 WERM—MRO' s— =150A -A A= A -=p—UU,I.—AAAA GENERAL NOTES., —INO—AT—I—TION. I Z.-"" AE I 71'77,61/ BRUCE M. CARLSON l`UCE. C"II.SON. NACN,mc, 219 H. 2k3 St., SUITE 30% NINE' -1. N. $I.., ftONE; (612 - $77 Fll* (611)3M ""'S E- AU7 -1---h.— CONTACT jESSICA InRSON CO. WANTS: E. ..EE—G. INC. SEAI, Iel-* 1 N21 ") 3: 0 �) 0 c,i Z him ET T-TLE: SITE OMILOPMENT C2 G - E NERAL NOTES: KEY NOTES- E—T= c. =z. SYMBOLS LEGEND 0 MT SITE BENCHMARK: WPE�FZVJOUS AREAS CT— 11. 11 .1 1 SR CE M. Pr F CAURLSON C. .—TIEl M 661, co.11cl jEssIc, .,E.so� IC L 5 SE-, r_7_";� 6--= S-Ell TITLE STTE O—ACE .(�s 0-5: C3 0 EXISTING CONDITIONS NOTES SAWCUT NOTE 1. FNX-XAC.II­GAT1XGTO-ET­T­-­ SYMBOLS LEPEND. CONTRACTOR CALITIONHI 1 UTILITY CONTACT LIST: =.XAARXI—NNRN,.ROR­ VERIFY SEWER LINE ELEVATION .L.—INI —­L.NNN­A—NAN­A,—, W—R—MR—M'. LAREA. AND 11" t�REC I ITg I OF OF ON L TION -TFXXAA =TNAT -I- XNE X: NX.____ I -o-; LRXX RXI 1: XAC­L AND -- ; " .1 1 ITT NO _AX AR TO FINE - OX GON­'_. A .­XON OF CONGARTA A 'MA FINE ­`NG RENF. OR NAN, tn� =NA I-ORINEACCOR-ANO-­ A_ _..'NR.�­T­FNXOFI--- "AF "A"IR X. RE -.1 - FOR LOCATING 'T. = % A : ; i I.- . AAANO­. FOR AlL TRATFICCONTROL -1 1- ------ E_AARO­­ To OR 1.- -1 TOTNE -IOR -.yGN li i NE- A­-=­X"n!oARN-_ =In T ANN XR___=.GR__O,__1__­ F BORE NOTE GRER ---NOT COA*FT-XC­--j� NX­'_' NA-C.- 17 - XAX__GR__ IT ALA oll T:'ELEPHONE SERVICE REQUIREMENTS '43 'o I. A. CIO C, RGOONI C, KkkAlIT Wi661RED RE, CONT 1F-­­NAR-XA_ XX-.NF-­-1TG1-TNRN­. WATER SERVICE CROSS SECTION ._AG- 11". ::T­ G.O.,_ -INE. I-NNG -1XCN.*C-AL--­-­ INONNERL UTILITY CONTACTS: =­_..'NONEGO. _."....."ON WATER SERVICE CROSS,SECTION CONSTIiU&ION NOTE Y SEWER CONSTRUCTION NOTE 1ARAT ­ G-FOR ..==C I.FNECT" -CARNITTARENT-RE-, -RE-AARX-SAINE-1 -NAFATAX.-RO-I'll-N-I, SEWER SERVICE (��OSS SECTION; T= r! INT. -7 ITT 7 UNDERGROUND ELEC. -FLOODLIG)IT-MO.VN NO-09 - _') - - 'n, -T.AIL4 CONCRETE POLE BASE DETAIL conur N1. A SEWER CL�TOUT DETAIL FRIALTI. __' .1. -1 -TAXISMARAI.XXXXXIDIAGI __ .-. _'_ CITTOFI-A'ANN-RETAR", 7 TORA INSIAILE.-GAS .__N" - "."..."O"A OF I TO 7. WATER LINE PIPE SANITARY SEWER PIPE INSTALLATION DETAIL INSTALLATION DETAIL � Mll -7 A 91 IT, Ow - 1 17 T i XX IS N5-, �9 C. SITE UTILITY PLAN XRA­ BRUCE M. CARLSON !TF Q.,,CAOSON, WIITFCI 19 A, 0 ST., SWC 301 FAX: C..1AC1:1ESSIC. "Ellm CII ENGINEERING. INC. SLAL! f"'FIVR 0 V, Z 0 C, SKET T17LE SITE UTTUTY PLAN C 4 E CONCRETE PAVING SECTION i__q _0, ASPHALT F2 PAVING SECTION Ell F6_) STEEL BOLLARD SECTION C, HANDICAP PARKING SIGN — AN,— ll�l BE I— 1- —11 Cut. F EDMONDS STANDARD DETAIL STANDARD TYPE *A' CURSPGVTTER DUAIL FRONT ELEVATION P— VIE SCREEN FENCE GATE CONCRETE LRB,SECTION BENT., T� ;,;­E IN —AT INE ­1 [�-,�,,-Q�PEETTDN -I.-IBE. ON 11 I IEII"T c IL A 11 Euln. M-IN I'Z' C.-IIIII, 51 10 1.- SECTION \­B­ 1-1- EW IS. 1 11 QAII -TFI S" cut _E S' .'si B, 11 ENGINEER 510. .GTE I GEMERE tE S­ BE CLISS ­1 a o)I<RETE ­ BE BROCIN rINIB4[D �C 1�11 !I'LL. BE 1-11 C_ B I _ " T�',G-SIKIAL. C.. "D EUTIE. S­ BY Q:Ell I—LL 11 0 St­IEL, r, RE E SN­ K ­10 It- ELENB CU ING CW"D M I.ALL BE E­IYED 110 KEPT NEIST 'Iy, ?Z �s I— Cut NNE) In— ­ ­INE.1 . IN � I I— rl 11 ll� C—A,I" EY 'I — Gull'I UAGAIEE CITY OF EDMONDS STANDARD DETA L ­., CONCRETE SIDEWALK CONCRETE SIDEWALK SECTION R� SCREEN FENCE A — ­,_ .-2j 7 BRUCE M. CARLSON am . c.QS*N. —no "1 1 2. � I Suln MI =.NIJ0LS. .. 51Q, I C IBEI IISS.CA IYEMN c s.11-Is ol I-01EENTIG. ING. C.— OR SE. -I P E BAY v) 3:: z Ln $1111 "ILE: SITE Do.,LS .:TS10. 0-n ..... ... ... C 5 V FIRE HYDRANT ASSEMBLY IN 5E CITY OF EDMONDS 5TANDIRD DETAIL I I Ka—mmu-11 FILTER FABRIC FENCE co) W PIPE BEDDING ,TEMPORARY SEDIMENT TRAP Db..d— d.— - RNRI —.. fNNNM ryp"'ff- P� �-p �. !.I,— Y T41! I RECYCLE TRASH ENLOSURE V%— "I.: ZZ: V-.M"r :4 —1 A "L, c=l �T' gzfr. F EDMONDS —1—D DETAIL DRIVE APRON N,T, /---\ I CITY OF EDMONDS STABILIZED R:l CONSTRUCTION ENTRANCE Ls-: \4-T Y�l DETAIL A BRUCE M. CARLSON IF"Ct. EAR.— —RC, 2 , s.,E (6 1 2h�33m 7�7 16' = 2923 CONTACT jESWI KnOm C CEI EIGIIEER--G. INC SE. cc , IL C) l-- Z -d 0 S-EEI ITIC SITE CIT.'s C6 -El I I R -------------- ----------------- ---------------- .......... X .... ................ T� Z. 9". A.= AAA- -0 Ai WSDOT TYPE 2 DRIVE ARPON -AAA T= --AAA- - - - - - - - - - - - - - - - STAUNIARD P I-- WSDOTCEMEMT WSDOT CEMENT CONCRETE CURBS CONCRETE SIDEWALK --AAAA ------------------------------- --------- 1 —18 1:7 1 -.. BRUCE M. CARLSON BllUCF 4 Alli 2 g . 2-D ST.. SUITE 301 �o.( 6121 338-6677 C.."Cl vrSSIEA Wl'so. C.—II—S! CEO,(-C-MEERING. INC SEA, C) V) C3 I'l z Ell, S.t(I T.%C. SITE OETAULS D— :A FLOGRAD PERK !�l TER DETAIL 644.� t 7A OIL/WATER SEPARATOR TEE pl- I- . ... . .... A =Z, DETENTION TANK DETAIL - CE M. C-AURLSON 311 C IESSCA IVEMON CO.SU' " L S SIAL SITE ot?v" lU SO.S C8 0 I 101 =DETO.R HWY 99 TRAFFIC TRAFFIC CONTROL NOTES: SYMBOLS LEGEND E 0 r R n- '. --4 1.91 V7" +1 o DFOUR.- 230th ST TRAFFIC CONTROL 4 77- ........ . . ............. Eli - - I till FSR CEM. f CNI-SON 211 - 2ND ST-4o!"' 3510 3M-2.1 NTAC IESWA "N P— .— C"sm— CEI EN4,NEE:ING. INC+ —c— I' E C) v) vi I z 0 (A S-Ell I-nl: TRAFFIC COWROL I'UN c 9 Aerial Photo (Est. 2007) Lovell-Saueriand and Associates O'Reilly Auto Parts Final Engineering and Drainage Report 23005 Highway 99 L,=W-u September 2011 LSA No.5331 � I—IM P , 1111,�tri;l, 0-1 STORMWA TER CONTROL SYSTEM SUMMARYAND CALCULATIONS. The project proposes to create, replace and/or retain 29,1000 sf of impervious surface on -site. To mitigate the development of the site, a detention tank system will be installed to control the storm drainage runoff (flow control). The on -site impervious surfaces shall be collected and routed to the onsite detention tank located in tile northeast portion of the site. The 70 feet of 8 ft diameter tank will mitigate the allowable release rates for the 2-year, 10-year and 100-year design criteria for a Category 2 Small Site project. WWHM3 continuous runoff modeling software by Washington State Department of Ecology was used to model the detention tank system. Flow control sizing was conducted using the "Puget East 36" precipitation tirne series values in accordance with the Edmonds Municipal Code. The attached input/output data and statistical analysis demonstrates that the designed infiltration trench will infiltrate a majority of the storms. Infiltration Trench Design Summary Table: Site Area Summary: Total Site Area = 43,429 sf (0.997 ac) Proposed I in pervious = 29,100 sf (0.668 ac) Building = 7,500 sf Driveway / Parking = 21,600 sf Proposed Pervious (Lawn and landscape) = 14,329 sf (0.329 ac) Detention Tank Design (70' of 8 ft dia.) Pipe Diameter = 96" Pipe Length = 70 Ft Pipe Invert = 377.50 (0.5 ft dead storage) Pipe Slope = 0.5% (insignificant slope to include in modeling) Orifice I = 7/8" At 378.00 Orifice 2 = 7/8" At 383.05 Overflow = 385.45 Peak Stage above 8" Riser to pass I 00-Yr flow rate of 0.4578 is 385.54 Runoff Release 2-yr Allowable = 0.0468 cfs (0.07 cfs per acre of impervious) 2-yr Design = 0.0453 cfs I 0-yr Allowable = 0.0935 cfs (0. 14 cfs per acre of impervious) 10-yr Design = 0.0935 cfs 100-yr Allowable = 0.2204 cfs (0.33 cfs per acre of impervious) 100-yr Design = 0.2149 cfs Lovell-Sauerland and Associates 0'Reffly Auto Parts Final Engineering and Drainage Report 23005 Highway 99 LSA No.5331 September 2011 Stormwater Quality Control: Basic water quality treatment and phosphorus removal is required for the site due to the fact tile site is a Category 2 small site project with more than 5,000 new/replaced impervious surfaces and located in the Greater Lake Ballinger Watershed (Halls Creek watershed drains to Lake Ballinger). To satisfy tile water quality treatment requirements a two -cartridge FloGard Perk Filter System is proposed. The FloGard Perk Filter System has DOE general use approval for basic water quality treatment and phosphorus removal. The filter system shall be placed downstream of the detention tank. Sizing calculations are attached in this section and O&M recommendations are included in section 1. - In addition to water quality treatment provided by the filter system, oil/water separator tees will be provided on the discharge pipes directed into the detention and water quality treatment system to provide oil containment in the collection catchbasins prior to discharging flows to the infiltration trench system. Lovell-Saueriand and Associates O'Reilly Auto Parts Final Engineering and Drainage Report 23005 Highway 99 LSA No. 5331 September 2011 k - Storm Drainage Calculations WWHM3 Input/Output: Project Name: 5331 WWHM3 Site Address: 23005 HWY 99 City EDMONDS Report Date 9/1/2011 MGS Regoin Puget East Data Start 1939/10/1 Data End 2097/08/31 DOT Data Number: 03 WWHM3 Version: PREDEVELOPED LAND USE Name : Basin 1 Bypass: No GroundWater: No Pervious Land Use Acres C, Forest, Mod .997 Impervious Land Use Acres Element Flows To: Surface Interflow Groundwater Name : Basin 1 Bypass: No GroundWater: No Pervious Land Use Acres C, Lawn, Flat .146 C, Lawn, Mod .183 Impervious Land Use Acres ROOF TOPS FLAT 0.172 PARKING FLAT 0.378 PARKING MOD 0.118 Element Flows To: Surface Interflow Groundwater Tank 1, Tank 1, Lovell-Sauertand and Associates O'Reilly Auto Parts Final Engineering and Drainage Report 23005 Highway 99 LSA No.5331 September 2011 VIM E-3 Name Tank 1 Tank Name: Tank 1 Depth: 8ft. Tank Type Circular Diameter 8 ft. Length 70 ft. Discharge Structure Riser Height: 7.95 ft. Riser Diameter: 8 in. Orifice 1 Diameter: 0.875 in Orifice 1 Diameter: 0.875 in Elevation: 0.5 ft. Elevation: 5.55 ft. File Edit View Help D G3 61 a 7� W M"- SGENARIOS r acility Name Outlet 1 Outlet 2 Outlet 3 f- Precleveloped Downstream Connection F� Mogat-d Facility Type Precipitation Applied to Facility ITank. Quick Tank Run Scenaiio �vaporahonAppfiedloFj��o Facility Bottom Elevation (ft) 13775 FZ CZ Facility Dimensions Outlet Structure Tank Type lcacul& I Firm Height [ft) H-V D etef (ft) lam I Lerigth (ft) k77d Rim Dta-eterfml Rim Type fF—Ig Notch Type Orifice Diameter Height Wax Number Qn) (Ft) (CIS) Infiltration F- ---%4 11 fo.675 o.� .1 0.05507 2 fo-8�i— f5 5-5 ' -Ji 0.03147 3 Fa Fo J. 0 Pond Volume at Rim Head lacte-111) .081 Move Elernerb Tankinciement Show Pond Table Fcp;; T able —1 d- -7:j Lovell-Sauertand and Associates O'Reilly Auto Parts Final Engineering and Drainage Report 23005 Highway 99 LSA No. 5331 September 2011 Element Flows To: Outlet I Outlet 2 Tank Hydraulic Table I Stage(ft) Area(acr) Volume(acr-ft) Dschrg(cfs) Infilt(cfs) 377.5 0.000 0.000 0.000 0.000 381.7 0.007 0.043 0.039 0.000 377.6 0.000 0.000 0.000 0.000 381.8 0.007 0.044 0.039 0.000 377.7 0.000 0.000 0.000 0.000 381.9 0.007 0.045 0.039 0.000 377*1 0,000 0*00 1 0,000 0*000 381.9 0.007 0.046 0.040 0.000 377.9 0.001 0.001 0.000 0.000 382.0 0.007 0.047 0.040 0.000 377.9 0,001 0.002 0.000 0.000 382.1 0.007 0.048 0.041 0.000 378.0 0.001 0.002 0.004 0.000 382.2 0.008 0.049 0.041 0.000 378,1 0*00 1 0,003 0,007 0*000 382.3 0.008 0.051 0.042 0.000 378.2 0.001 0.004 0.009 0.000 382.4 0.008 0.052 0.042 0.000 378.3 0.001 0.004 0.011 0.000 382.5 0.008 0.053 0.043 0.000 378.4 0.001 0.005 0.013 0.000 382.6 0.008 0.054 0.043 0.000 371,5 0,002 0,016 0*114 0,000 382.7 0.008 0.055 0.043 0.000 378.6 0.002 0.006 0.015 0.000 382.7 0.008 0.056 0.044 0.000 378.7 0.002 0.007 0.016 0.000 382.8 0.009 0.057 0.044 0.000 378.7 0.002 0.008 0.017 0.000 382.9 0.009 0.058 0.045 0.000 378,1 (1,002 0,009 0,011 0*000 383.0 0.009 0.059 0.045 0.000 378.9 0.002 0.010 0.019 0.000 383.1 0.009 0.060 0.050 0.000 379.0 0.002 0.011 0.020 0.000 383.2 0.009 0.061 0.053 0.000 379.1 0.003 0.012 0.021 0.000 383.3 0.009 0.062 0.056 0.000 379*2 0,003 0*012 0*022 0*000 383.4 0.009 0.063 0.058 0.000 379.3 0.003 0.013 0.023 0.000 383.5 0.010 0.064 0.060 0.000 379.4 0.003 0.014 0.024 0.000 383.5 0.010 0.065 0.061 0.000 379.5 0.003 0.015 0.024 0.000 383.6 0.010 0.066 0.063 0.000 379.5 0.003 0.016 0.025 0.000 383.7 0.010 0.067 0.065 0.000 379.6 0.003 0.017 0.026 0.000 383.8 0.010 0.068 0.066 0.000 379.7 0.004 0.018 0.026 0.000 383.9 0.010 0.069 0.067 0.000 379.8 0.004 0.019 0.027 0.000 384.0 .0.010 0.070 0.069 0.000 379.9 0.004 0.020 0.028 0.000 384.1 0.011 0.071 0.070 0.000 380.0 0.004 0.021 0.028 0.000 384.2 0.011 0.072 0.071 0.000 380.1 0.004 0.022 0.029 0.000 384.3 0.011 0.073 0.072 0.000 380.2 0.004 0.024 0.030 0.000 384.3 0.011 0.074 0.074 0.000 380.3 0.004 0.025 0.030 0.000 384.4 0.011 0.074 0.075 0.000 380.3 0.005 0.026 0.031 0.000 384.5 0.011 0.075 0.076 0.000 380.4 0.005 0.027 0.031 0.000 384.6 0.011 0.076 0.077 0.000 380.5 0.005 0.028 0.032 0.000 384.7 0.012 0.077 0.078 0.000 380.6 0.005 0.029 0.032 0.000 384.8 0.012 0.077 0.079 0.000 380.7 0.005 0.030 0.033 0.000 384.9 0.012 0.078 0.080 0.000 380.8 0.005 0.031 0.034 0.000 385.0 0.012 0.078 0.081 0.000 380.9 0.005 0.032 0.034 0.000 385.1 0.012 0.079 0.082 0.000 381.0 0.006 0.034 0.035 0.000 385.1 0.012 0.080 0.083 0.000 381.1 0.006 0.035 0.035 0.000 385.2 0.012 0.080 0.084 0.000 381.1 0.006 0.036 0.036 0.000 385.3 0.013 0.080 0.085 0.000 381.2 0.006 0.037 0.036 0.000 385.4 0.013 0.081 0.086 0.000 381.3 0.006 0.038 0.037 0.000 385.5 0.013 0.081 0.159 0.000 381.4 0.006 0.039 0.037 0.000 385.6 0.000 0.000 0.424 0.000 381.5 0.006 0.040 0.038 0.000 381.6 0.007 0.042 0.038 0.000 Lovell-Sauerfand and Associates O'Reilly Auto Parts Final Engineering and Drainage Report 23005 Highway 99 LSA No. 5331 September 2011 MITIGATED LAND USE ANALYSIS RESULTS Flow Frequency Return Periods for Predeveloped POC #1 Return Period Flow(cfs) 2 year 0.018075 5 year 0.02783 10 year 0.03 )2085 25 year 0.035541 50 year 0.037158 100 year 0.038241 Flow Frequency Return Periods for Mitigated. POC #1 Return Period Flow(cfs) 2 year 0.045301 5 year 0.070406 10 year 0.093519 25 year 0.132114 50 year 0.169202 100 year 0.214926 Yearly Peaks for Predeveloped and Mitigated. POC #I Year Predeveloped Mitigated 1941 0.023 0.044 1981 0.022 0.065 2021 0.011 0.033 2061 0.008 0.036 1942 0.008 0.038 1982 0.007 0.039 2022 0.027 0.065 2062 0.018 0.041 1943 0.021 0.043 1983 0.022 0.296 2023 0.007 0.041 2063 0.072 0.064 1944 0.009 0.041 1984 0.015 0.043 2024 0.016 0.043 2064 0.014 0.038 1945 0.003 0.033 1985 0.015 0.036 2025 0.013 0.038' 2065 0.026 0.063 1946 0.026 0.075 1986 0.010 0.039 2026 0.027 0.102 2066 0.011 0.039 1947 0.016 0.039 1987 0.034 0.106 2027 0.020 0.042 2067 0.005 0.032 1948 0.018 0.042 1988 0.029 0.176 2028 0.016 0.040 2068 0.018 0.041 1949 0.031 0.063 1989 0.015 0.039 2029 0.020 0.051 2069 0.039 0.101 1950 0.015 0.038 1990 0.018 0.036 2030 0.015 0.044 2070 0.010 0.033 1951 0.064 0.072 1991 0.058 0.265 2031 0.023 0.044 2071 0.007 0.030 1952 0.025 0.044 1992 0.047 0.254 2032 0.019 0.045 2072 0.008 0.032 1953 0.006 0.043 1993 0.013 0.039 2033 0.034 0.082 2073 0.010 0.042 1954 0.008 0.039 1994 0.011 0.035 2034 0.008 0.030 2074 0.041 0.192 1955 0.014 0.040 1995 0.007 0.030 2035 0.040 0.069 2075 0.022 0.044 1956 0.006 0.040 1996 0.019 0.040 2036 0.017 0.040 2076 0.003 0.036 1957 0.016 0.042 1997 0.047 0.126 2037 0.016 0.055 2077 0.025 0.069 1958 0.012 0.035 1998 0.028 0.044 2038 0.000 0.033 2078 0.001 0.033 1959 0.015 0.040 1999 0.010 0.034 2039 0.012 0.038 2079 0.007 0.041 1960 0.015 0.038 2000 0.028 0.079 2040 0.009 0.035 2080 0.011 0.039 1961 0.018 0.055 2001 0.014 0.044 2041 0.032 0.041 2081 0.044 0.206 1962 0.016 0.043 2002 0.006 0.035 2042 0.018 0.044 2082 0.019 0.056 1963 0.008 0.036 2003 0.013 0.040 2043 0.020 0.043 .2083 0.026 0.066 1964 0.008 0.034 2004 0.034 0.077 2044 0.029 0.040 2084 0.016 0.038 1961 0,014 0,038 2005 0,006 0"036 2041 0,011 0*033 2085 0.019 0.042 1966 0.018 0.041 2006 0.013 0.034 2046 0.013 0.060 2086 0.012 0.036 1967 0.012 0.039 2007 0.017 0.052 2047 0.017 0.040 2087 0.016 0.049 1968 0.030 0.063 2008 0.012 0.040 2048 0.010 0.037 2088 0.016 0.049 1969 0.015 0.042 2009 0.021 0.046 2049 0.008 0.063 2089 0.010 0.040 1970 0.015 0.041 2010 0.036 0.083 2050 0.010 0.032 2090 0.017 0.078 1971 0.012 0.039 2011 0.023 0.072 2051 0.015 0.106 2091 0.010 0.045 1972 0.013 0.040 2012 0.027 0.073 2052 0.013 0.037 2092 0.016 0.043 1973 0.040 0.074 2013 0.018 0.042 2053 0.008 0.034 2093 0.032 0.067 1974 0.013 0.037 2014 0.042 0.119 2054 0.037 0.044 2094 0.006 0.033 1975 0.022 0.042 2015 0.017 0.053 2055 0.005 0.030 2095 0.006 0.036 1976 0.020 0.067 2016 0.010 0.033 2056 0.029 0.179 2096 0.011 0.038 1977 0.018 0.040 2017 0.032 0.078 2057 0.053 0.173 2097 0.013 0.035 1978 0,001 0,033 2018 0,009 0,037 2058 0,057 0*276 2098 0,032 0,061 1979 0.014 0.044 2019 0.016 0.035 2059 0.019 0.038 1980 0.015 0.036 2020 0.016 0.039 2060 0.022 0.058 Lovell-Sauerfand and Associates O'Reilly Auto Parts Final Engineering and Drainage Report 23005 Highway 99 LSA No. 5331 1. B R September 2011 Ranked Yearly Peaks for Predeveloped and Mitigated. POC #1 Rank Predeveloped Mitigated 1 0.0718 0.2959 54 0.0191 0.0443 107 0.0126 0.0388 2 0.0641 0.2759 55 0.0186 0.0442 108 0.0121 0.0386 3 0.0584 0.2652 56 0.0186 0.0440 109 0.0120 0.0386 4 0.0568 0.2541 57 0.0184 0.0439 110 0.0119 0.0385 5 0.0533 0.2064 58 0.0183 0.0439 111 0.0118 0.0385 6 0.0472 0.1918 59 0.0181 0.0438 112 0.0117 0.0382 7 0.0469 0.1793 60 0.0181 0.0438 113 0.0115 0.0381 8 0.0443 0.1760 61 0.0179 0.0437 114 0.0114 0.0380 9 0.0424 0.1732 62 0.0178 0.0436 115 0.0113 0.0379 10 0.0409 0.1263 63 0.0178 0.0433 116 0.0110 0.0379 11 0.0403 0.1187 64 0.0177 0.0433 117 0.0110 0.0378 12 0.0396 0.1060 65 0.0176 0.0432 118 0.0109 0.0377 13 0.0386 0.1056 66 0.0175 0.0431 119 0.0106 0.0376 14 0.0374 0.1019 67 0.0173 0.0429 120 0.0105 0.0372 15 0.0357 0.1007 68 0.0170 0.0429 121 0.0104 0.0372 16 0.0343 0.0826 69 0.0169 0.0428 122 0.0101 0.0371 17 0.0340 0.0816 70 0.0166 0.0425 123 0.0099 0.0365 18 0.0339 0.0787 71 0.0165 0.0424 124 0.0099 0.0364 19 0.0324 0.0778 72 0.0164 0.0422 125 0.0098 0.0362 20 0.0323 0.0776 73 0.0164 0.0422 126 0.0097 0.0362 21 0.0322 0.0771 74 0.0163 0.0420 127 0.0096 0.0361 22 0.0316 0.0747 75 0.0162 0.0419 128 0.0096 0.0360 23 0.0310 0.0736 76 0.0162 0.0418 129 0.0090 0.0359 24 0.0297 0.0731 77 0.0161 0.0415 130 0.0086 0.0357 25 0.0294 0.0723 78 0.0158 0.0415 131 0.0085 0.0357 26 0.0294 0.0716 79 0.0157 0.0414 132 0.0085 0.0355 27 0.0288 0.0693 80 0.0157 0.0413 133 0.0082 0.0351 28 0.0281 0.0688 81 0.0156 0.0412 134 0.0082 0.0351 29 0.0281 0.0670 82 0.0155 0.0410 135 0.0081 0.0351 30 0.0275 0.0668 83 0.0155 0.0408 136 0.0080 0.0349 31 0.0271 0.0657 84 0.0155 0.0407 137 0.0079 0.0347 32 0.0269 0.0650 85 0.0155 0.0406 138 0.0077 0.0347 33 0.0265 0.0648 86 0.0154 0.0405 139 0.0075 0.0344 34 0.0259 0.0647 87 0.0153 0.0403 140 0.0075 0.0344 35 0.0257 0.0643 88 0.0152 0.0402 141 0.0074 0.0342 36 0.0250 0.0634 89 0.0149 0.0402 142 0.0074 0.0335 37 0.0248 0.0633 90 0.0148 0.0401 143 0.0072 0.0334 38 0.0234 0.0630 91 0.0148 0.0399 144 0.0069 0.0334 39 0.0232 0.0629 92 0.0147 0.0398 145 0.0069 0.0332 40 0.0232 0.0600 93 0.0146 0.0398 146 0.0065 0.0332 41 0.0224 0.0580 94 0.0144 0.0397 147 0.0064 0.0331 42 0.0223 0.0560 95 0.0142 0.0397 148 0.0063 0.0331 43 0.0220 0.0551 96 0.0140 0.0396 149 0.0063 0.0330 44 0.0218 0.0548 97 0.0140 0.0396 150 0.0059 0.0328 45 0.0217 0.0526 98 0.0136 0.0396 151 0.0058 0.0328 46 0.0215 0.0524 99 0.0133 0.0395 152 0.0053 0.0316 47 0.0205 0.0514 100 0.0133 0.0394 153 0.0045 0.0316 48 0.0204 0.0490 101 0.0131 0.0394 154 0.0035 0.0315 49 0.0201 0.0490 102 0.0131 0.0394 155 0.0034 0.0303 50 0.0200 0.0458 103 0.0129 0.0393 156 0.0014 0.0301 51 0.0197 0.0452 104 0.0129 0.0393 157 0.0008 0.0299 52 0.0195 0.0448 105 0.0127 0.0393 158 0.0002 0.0296 53 0.0193 0.0445 106 0.0126 0.0390 Lovell-Sauerfand and Associates O'Reilly Auto Parts Final Engineering and Drainage Report 23005 Highway 99 LSA No.5331 September 2011 F- POC #1 Facility FAILED duration standard for I+ flows. Flow(CFS) Predev Dev Percentage Pass/Fail 0.0090 11526 158782 1377 Fail 0.0187 1581 70628 4467 Fail 0.0284 445 18868 4240 Fail 0.0093 10741 156151 1453 Fail 0.0190 1531 68496 4473 Fail 0.0286 431 18010 4178 Fail 0.0096 10021 153521 1531 Fail 0.0193 1459 66212 4538 Fail 0.0289 414 17152 4142 Fail 0.0099 9344 150752 1613 Fail 0.0195 1402 64066 4569 Fail 0.0292 407 16390 4027 Fail 0.0102 8760 148122 1690 I -ail 0.0198 1342 61976 4618 Fail 0.0295 386 15657 4056 Fail 0.0105 8230 145492 1767 Fail 0.0201 1285 59941 4664 Fail 0.0298 374 14923 3990 Fail 0.0107 7723 142723 1848 Fail 0.0204 1224 57961 4735 Fail 0.0301 361 14217 3938 Fail 0.0110 7282 139955 1921 Fail 0.0207 1183 55996 4733 Fail 0.0303 345 13528 3921 Fail 0.0113 6826 1373252011 Fail 0.0210 1122 54072 4819 Fail 0.0306 333 12895 3872 Fail 0.0116 6420 1345562095 Fail 0.0213 1084 52078 4804 Fail 0.0309 324 12289 3792 Fail 0,0119 6030 1311140 2181 Fail 0,0215 1140 51292 4811 Fail 0,0312 309 11675 3171 Fail 0.0122 5631 1292122294 Fail 0.0218 1000 48548 4854 Fail 0.0315 295 11120 3769 Fail 0.0124 5266 1264162400 Fail 0.0221 964 46790 4853 Fail 0.0318 290 10580 3648 Fail 0.0127 4942 1235922500 Fail 0.0224 927 45129 4868 Fail 0.0320 275 10099 3672 Fail 0.0130 4664 1209762593 Fail 0.0227 894 43385 4852 Fail 0.0323 260 9664 3716 Fail 0.0133 4402 1183042687 Fail 0.0230 867 41793 4820 Fail 0.0326 255 9181 3600 Fail 0.0136 4102 1154802815 Fail 0.0232 844 40298 4774 Fail 0.0329 241 8738 3625 Fail 0.0139 3893 1127672896 Fail 0.0235 810 38719 4780 Fail 0.0332 235 8305 3534 Fail 0.0142 3637 110081 3026 Fail 0.0238 792 37294 4708 Fail 0.0335 222 7913 3564 Fail 0,0144 3429 1071623136 I -ail 0*0241 760 35868 4719 Fail 0,0337 116 7556 3498 Fai I 0.0147 3239 1049183239 Fail 0.0244 740 34470 4658 Fail 0.0340 205 7146 3485 Fail 0.0150 3050 1023293355 Fail 0.0247 717 33071 4612 Fail 0.0343 193 6822 3534 Fail 0.0153 2879 99754 3464 Fail 0.0249 688 31742 4613 Fail 0.0346 183 6497 3550 Fail 0.0156 2728 97179 3562 Fail 0.0252 670 30469 4547 Fail 0.0349 176 6187 3515 Fail 0.0159 2596 94632 3645 Fail 0.0255 645 29195 4526 Fail 0.0352 170 5912 3477 Fail 0.0161 2461 92071 3741 Fail 0.0258 619 27977 4519 Fail 0.035� 161 5645 3506 Fail 0.0164 2340 89566 3827 Fail 0.0261 596 26814 4498 Fail 0.0357 150 5395 3596 Fail 0.0167 2204 87088 3951 Fail 0.0264 571 25679 4497 Fail 0.0360 139 5159 3711 Fail 0.0170 2092 84651 4046 Fail 0.0266 551 24627 4469 Fail 0.0363 129 4913 3808 Fail 0.0173 1993 82215 4125 Fail 0.0269 526 23547 4476 Fail 0.0366 123 4698 3819 Fail 0.0176 1901 79861 4200 Fail 0.0272 507 22578 4453 Fail 0.0369 116 4492 3872 Fail 0.0178 1818 77480 4261 Fail 0.0275 490 21582 4404 Fail 0.0372 108 4272 3955 Fail 0,0181 1735 71210 4334 Fail 0*0271 472 20626 4369 Fai 1 0.0184 1663 72871 4381 Fail 0.0281 454 19727 4345 Fail The development has an increase in flow durations from 1/2 predeveloped 2 year flow to the 2 year flow or more than a 10% increase from the 2 year to the 50 year flow. Per1nd and Imp1nd Changes No changes have been made. This program and accompanying documentation is provided 'as -is' without warranty of any kind. The entire risk regarding the performance and results of this program is assumed by the user. Clear Creek Solutions and the Washington State Department of Ecology disclaims all warranties, either expressed or implied, including but not limited to implied warranties of program and accompanying documentation. In no event shall Clear Creek Solutions and/or the Washington State Department of Ecology be liable for any damages whatsoever (including without limitation to damages for loss of business profits, loss of business information, business interruption, and the like) arising out of the use of, or inability to use this program even if Clear Creek Solutions or the Washington State Department of Ecology has been advised of the possibility of such damages. Lovell-Saueriand and Associates O'Reilly Auto Parts Final Engineering and Drainage Report 23005 Highway 99 LSA No. 5331 September 2011 E'_8 Detention Tank Buoyancy Calculations Buoyancy (Uplift Force): Assume saturation level to extend up to top of pipe (full 8 ft.). )2 Displacement volume of 8' diameter pipe= 3.14 x (4 =50.24sfperft.ofpipe Density of water = 62.4 lbs per cubic ft. Uplift Force of water = (28.26 sf per ft) x (62.4 lbs per cubic ft) = 3,135 Ibs per ft Weight of Fill above Pipe (Hold-down Force): Minimum cover over pipe 3.5 ft (385.5 to 389) Minimum volume above pipe = 3.5 ft x 8 ft = 28 sf per ft. of pipe Density of fill material = 120 lbs per cubic ft. Hold-down Force. = (28 sf per ft) x (120 lbs per cubic ft) = 3,360 Ibs per ft 3 ft wide x 3.5 6 deep (min.) Fill above pipe. Hold-down Force >> Uplift Force, thus pipe will not float. Lovell-Saueriand and Associates O'Reilly Auto Parts Final Engineering and Drainage Report 23005 Highway 99 LSA No.5331 Septernber2011 WWUM3 Water Quality Flow Output File Edit View Help D C9 Q: (a On -Line BMP Off -Line BMP 24 hour Volume (acre feet) Standard Flow Rate (cfs) Standard Flow Rate (cfs) 15 Minute Flow Rate 15 Minute Flow fate Durations, Flow Frequency -Water Quality Weiland Fluctuation Water Quality BMP Flow and Volume for POC 1. On-line facility volume: 0.0555 acre-feet On-line facility target flow: 0.01 cfs. Adjusted for 15 min: 0.0345 cfs. Off-line facility target flow: 0.0205 cfs. Adjusted for 15 min: 0.0223 cfs. On-line Peak Treatment Flow Rate = 0.0345 cfs Treatment Rate per 18" Phosphorous Treatment Cartridge= 0.0227cfs(10.2gpm) Required Cartridges 0.0345 cfs / 0.0227 cfs = 1.5 cartridges Minimum Required Standard Cartridges = 2 minimum See attached calculations from manufacture. Lovell-Sauertand and Associates O'Reilly Auto Parts Final Engineering and Drainage Report 23005 Highway 99 LSA No.5331 L. W OF"I September 2011 September Ist, 2011 LSA Engineering 1921736 Ih Ave. W., Suite 106 Lynnwood, WA 98036 Attn: Rob Long Re: O'Reilly Auto Parts, Edmonds, WA - Perk Filter Sizing Mr. Long: Please find below sizing verification for the Perk Filter System on the above referenced project. Unit #1 Perk Filter Manhole: Qtreat=0.0345 cfs (15 gpm) With a Qtreat of 0.0345 cfs (15 gpm), and using an 18" tall cartridge with media mix of ZPC (Zealite/ Perlite/ Carbon) rated at 10.2 gpm/cartridge, the unit is designed as follows: Treatment Flow Rate=0.0345 cfs=15 gpm (15 gpm)/(10.2 gpm/ca rt ridge)= 1.47 cartridges Use 2 each 18" cartridges in a 48" manhole structure Best Regards, Jeff Hardesty Engineering Technician E--// CY) C? 0 01 180* 0- 8' PVC I E: 377.65' 0 INLET 0 0 48.00 BOLTED & GASKETED ACCESS COVER. FIELD POURED CONCRETE COLLAR REQUIRED, BY OTHERS. ------------ #3 4.00, ------------- 12.65ft 10.35ft (151.79ifil 124.20in I 4.00' #2 12.60ft [143.99in] INLET IE: 377.65' # 1 4.0(Y I 1.00ft 1 2.00in ---------- I .00in P 04.00ft [ 5 .42ft d [48.00in] FILTER CARTRIDGES NOT SHOWN IN THIS VIEW TO SHOW INLET INVERT. .83ft [10.00in] 3X HOLE 0* 8* PVC IE: 375.35' Internals 048 Manhole Components SK-0566 Floor a SK-0567 Bypass - O*Ct OUTLET — 2X 18" Perk Filter r'ADTDlr'1r-j:Q MIA: 1300.UU 12.65ft 1 51.80in M. '17r 'Arl 50ft 16.00in] tor clarity. NOTE: Treatment Flow Rate 1. MAXIMUM WEIGHT 6561. (ASSEMBLED WITH CARTRIDGES). 20.4 gpm / 0.045 cfs P01 1,N/A NEW N/A W. M—" 1�0 JOB DETAIL Perk Filter"o 48" Manhole APPROVALS DATE KriStar Enterprises, Inc. with 18" Carilridges, 2 Each 360 Sutton Place, Santa Rosa, CA 95407 UIAWN Ph: 800.579.8819, Fax: 707.524.8186. �.knslar.corn Customer: CEI Engineering J.McKinley 09/01/11 SIZE I DRAfflNG NO. REV. Job Name: O'Reilly Auto Parts,- 1 A PDD-3914 Pol J. Hardesty 09/01/1 1 SCALE: NONE Edmonds,WA Palr`dF �e-sty 09/01/11 DO NOT SCALE DRAWING SHEET 1 OF I CAPACITY CALCULA TIONS.- 100-YEAR OVERFLOW: I 00-YR un-detained flow rate = 0.4578 cfs 8" Stage -Release Rates: Equation: Q = 3.782 (D)'(H)O-' Description: RISER Riser Diarneter: 8.00 in (0.6667 ft) Elev: 385.45 ft Orif Coefficient ... : 3.782 STAGE <--DISCHARGE --- > (ft) --- cfs -- ------- 385.45 0.0000 385.55 0.5315 385.65 0.7517 385.75 0.9207 385.85 1.0631 385.95 1.1886 Peak Stage above 8" Riser to pass I 00-Yr flow rate of 0.4578 is 3 )85.54 DOWNSTRAM PIPE SYSTEMS. I 00-YR undetained flow rate = 0.4578 cfs Downstream Pipe Capacities Calculations: Equation: Q = A * 1.486/n * R "' * S "2 -Mannings Equation, with a Mannings "n" of 0.0 12. 7 ft of 8" PVC at 5.0% - capacity 3.16 cfs 30 ft of 8" PVC at 1.0% - capacity 1.41 cfs 105 ft of 12" PVC at 0.6% - capacity = 3.22 cfs Thus, Downstream system has adequate capacity to convey undetained 100-yr storm event. Lovell-Saueriand and Asso'ciates O'Reilly Auto Parts Final Engineering and Drainage Report 23005 Highway 99 LSA No.5331 September 2011 E-1.3 DOWNSTREAM DRAINAGE DESCRIPTION. The site is located in the Halls Creek watershed basin. The Halls Creek basin is a large urban basin that collects storrnwater runoff from commercial and residential areas along the easterly boundary of the City Edmonds and discharges flows to Lake Ballinger (see attached watershed map). The collected siormwater runoff from the site will discharge to a pipe and catchbasin system located in 23 01h St SW along the site's north boundary. The storm pipe sys'tern within 230"' St SW directs flows easterly to 76"' Ave W about 550 feet east of the site. At ' 76"' Ave W the storm pipe systern is directed north about 650 feet to 228" St SW.. At 228"' St SW the pipe system is directed east about 850 feet and then directed southwest between private properties and along 2291h pl SW and discharging into Halls Creek, about 2,850 downstream of the site. Flows follow Halls Creek about 1,650 feet south and enter Lake Ballinger, about 4,500 feet downstream of the site. A majority of the downstream system consists of a man-made pip, and catchbasin system. lo apparent flooding or system inadequacies within a 1/4 mile downstream of the site were discovered during site visits or research of the downstream system. ISee attached watershed and downstream drainage map for the local downstream path. Lovell-Saueriand and Associates O'Reilly Auto. Parts Final Engineering and Drainage Report 23005 Highway 99 LSA No.5331 September 2011 , F. N FIGURE B-1 A CITY OF EDMONDS d Gu WATERSHEDS Deer Creek Perrinville Edmonds Marsh Puget Sound -Mead6wdale, Edmonds Way Puget Sound Piped Mep dowd ale Frultdale Shell Creek , ( I --J Good Hope Pond Shellabarger A. Halls Creek Southwest Edmonds A I HindleyCreek Southwest Edmonds B - - ------------------ `06tfallCreekStil Lake Ballinger Stilthouse Creek thouse Cree� Lund's Gulch Talbot Park A Meadowdale A Talbot Park 8 Terrace Ciee Meadowdale 13 Terrace Creek w. ,j �v. Northstream Westgate Pond -IJ. Outfall Creek Willow Creek 0 L000 z000 4.00D 6.00D 8.000 errinvi e F-t Ptjget5�r6nd, r 12, 1 2,000 ft T�lbqt Plark;A No —antv of aft sort. nclud,g ­�. frtn­, or roetciuntao4tv —pariv this Product March 30. 2010 N A a "jr6littlale rthstrearn Whale y GO od Hope Pond Vll 5 :74 �4 e Halls Creek 5 ITE, .0 22425) 22�20 22421 U WN 224�O '4 �3 22421 22420' UNKN04N 7830 7Z NKNO / 14-1584 -11' 73277321 '�--13]4514-6 j I 00 22431 22424COWNTY 3522431 14-137 1 22425 PNKNOWr, M:L4 814-136 22427 22428 04 ?14 22431 225 -238 1 7819/ 22508 fi 14-5 C194-l' 225'03 22502 22508 / V V 7328 322 22505 14-185,14-184 9 22508 22� 1 ' 22501 E). 12511 1' -4614-47 U11KNOWN 22510 13 '5 J� 3-460 2251\6,,,, 225 5 00, 509 22600 fl`14-110 114'-239 i 2'�Z :TERRACE2 13 621'3-46 22516 782 13-58 13-588 13-5171 7 22522 223 22517 22511 22602 d14-9 225 221607 3-585 3-586 22528 22529 1� 22521 22521 322604 1 22510 0-0 1 22�'33 ..295 p,4 43-464 114,240 14-241 f-*�766r* ...... ERRACE3 G--'0 1 7207 7205 7203 7201 13456 f,2604 7825 7815 261 22510 1 3;*A5 22111 -4 710SI7107 7105 94 UNI$PO.WN -38 ERRACE12 61 0 2606 13- gi, -4662245 22517 2262(or, 922619. '-�,TERRACE 14 f19-3 22605 7206 7204 7202 22 1 22618 1 )4-45�sl 3-591 2608 TERRACE13 3'504 Cb 01 4-zl 21---1- 0- 14-40 227 22607 2270 1 122 2�8 2%0 22626 13-46 4" 011, ��2,2�6�0 �4- 90 4-116 P261 0 7205 7203UNKNOWN 7110 71087106 2,708 1 -2 2263 1 22707 2- '06 1 f-41 2405 �2702 22609 0 23 1 1, -47 -500 [1/4-28 ,2' 2 15 22700 22701 711 22716 9.22712 A-42 2704 7204 22702 22703 2271 2 71 22720 1 -50 -502 - b, 4 478 22706 7206 22704 22705 728 730 22727 1 22706 22707 13-471 3-4 227 0 7819 2 725 22721 533 7503 74 74031313 22708 G4D16 0 13- 8 - 16- 13-590 14-297 7. 4 731122708 7307 22710 227112:2709 14-2 LV. -43 . I ERR6CE7 13 6;� cl 17�8�3C3 17 _85 16 --@ t7z86 TER 33@41 1 437 Ift 0,—,., � Z.9 11 22817 UNKNO NUNKN 2280 22806 UNKNO 7810 22800 1 17-T 0 28057422 7 7410 7202 :-01 -MR 6 -43,5 14 7330t.- 34 7308 1 71 8 UNKNO U OWN /* 6 34 22800 2 UNKNOW 'N�KN it 1 ' 81 22814 �Ij8722804 --YNKNOWN UN N N Y' f 11� 2281774217 15 7409 7403 7329 7327 . 22803 U K��O M 29 2282 1 22822 1 J2806 O�WN17U I NUNK 2 of 17-77 -75 , 6 22805 1 8� R 17 -UM 6. 6- 7-7q17-78 0 8 UNKNOWN - 22 29 22828 901 Y-1 2808 7107 6.42 7105 16-15 -157 .2 902 7428 22902 229 22902 22828 a -11 22 0 7420 7412 16-11 �-92 ***,, 7103 2908 22 10 22907 22 1 E RACE19 7825 i 11 22908 i 22904 7108 229 6 22915 919 i22906 6 229 1 229 74 97413 22918 . 7104 7102 3 -43 22908 23 t 120- 229 4 7427 22907 23000 2 io 1��2 2925 22925 , �7� 7105 16-272 Oth "q 7103 68 6- 16-25�a ,, 16-29, 6-158 2 30 7-73 22910 16-1 IJ3 931 1 -1 0 23003 1718922912 7101 432 4267420 7406 OWN 22911 23 05 412 2914 23010 7610 N WNU NOWN 0 7106 UNKN 2301 3 4 3011 NKNOWN 23023 22916 7109 7107 7104 7102 t291 79 ITE 23023 23025 TERRACE20 23026 2302 3 71057103 23030 0 7101 16.44 1 7 23039 23 1 -9122920 1 23031 2310 10 1 7112 7110 7108 �/*' 23122 3105 7 CE 21 J* UNK Wj UNKNOWN 7106 T'E' RA JI 7104 16-75823 11 8 23115 23117 7102 16-26 23124 231 7100 ,R1 6-2 0 16-75 1 8 760976097607 1 9 231 5 76117611 1 -6 1 6-31 . PRIVATE 5776 23129 1 VKNOW 6-181 N17-9 3201 j 16-311P at I ' 7-4 23203 2313 16- 9 23205 2320 23148 3204 U NOWN 23207 2 23211 23208 23502 21 V\ 232 2321 23216 1 23211 -j 23220 23212 23 5 23 14 , -j 3 4 it 16-141 217 1 -94 16-1 2 224 K 23Z34__ 23230 2 225 7- 32 8UN OWN 7 09 7707 23307 (UNKkbVN-,1k-1 8116 29 23 3 0 33 2 0 85 170 340 510 680 850 Feet Legend 1 in= 300 ft — Storm Pipes — DITCH - CREEK C1 Storm Catch Basins — Conlour-10ft-smoolhed accompany this product. 0 Storm Manholes Edmonds-Parcels-2010-03 No warranty of any sort, including accuracy, fitness, or merchant ability F-3 Grading and Erosion Control: This project will require grading to construct tile proposed building; driveway and parking area; and utilities (including the storrilwater detention system). Standard erosion control measures are proposed to be used during construction. The primary erosion and sediment control BMP during construction will be proper soil stabilization methods. Exposed soils shall be stabilized by application of effective BMPs that protect the soil from the erosive forces of raindrops, flowing water, and wind. Applicable practices include, but not limited to, temporary and permanent seeding, sodding, mulching, plastic covering, erosion control fabrics, matting, soil application of polyacrylamide (pam), the early application of gravel base oil areas to be paved, and dust control. The contractor shall select a soil stabilization method best suited for the particular situation. Stock piles must be stabilized and protected with sediment trapping measures. In addition, site containment of exposed soils shall be sustained by using silt fence barriers along the down -slope boundaries of the site's disturbance areas. See the site development plan for details. Soils: In accordance with the United States Department of Agriculture Soil Conservation Service,, Snohomish County Soil Survey the on -site soils consist of Alderwood-Urban land complex- 2% to 8% (soil #5). Alderwood soils are moderately well drained soil on till plains formed in glacial till and are categorized as a hydrologic group C soil (see full description attached). The Alderwood till soils are typically not suitable for infiltration of storrnwater. A full evaluation of the on -site soils is included in tile site specific geotechnical evaluation prepared by Robinson Noble, Inc (attached in section H.). Conclusion: The final site development construction plans will include specific grading and drainage improvement notes and details. With proper installation, maintenance and inspections of tile proposed construction the project should have minimal impact to the surrounding environment. Lovell-Saueriand and Associates O'Reilly Auto Parts Final Engineering and Drainage Report 23005 Highway 99 LSA No,5331 L. a R September 2011 Soils Map Lovell-Saueriand and Associates Final Engineering and Drainage Report LSA No.5331 O'Reilly Auto Parts 23005 Highway 99 September2011 SOIL SURVEY OF SNOHOMISH COUNTY AREA, WASHINGTON UNITED STATES DEPARTMENT OF AGRICULTURE, SOIL CONSERVATION SERVICE Alderwood -Urban land complex, (soil #5- 2 to 8 percent slopes) This moderately well drained soil is on till plains. It is moderately deep over a hardpan. The soil formed in glacial till. Areas are long and narrow. They are about 125 acres in size. The native vegetation is mainly conifers and hardwoods. Elevation is 50 to 550 feet. The average annual precipitation is about 40 inches, the average annual air temperature is about 50 degrees F, and the average frost -free season is 170 to 190 days. Typically, the surface layer is very dark grayish brown gravelly sandy loam about 7 inches thick. The upper part of the subsoil is dark yellowish brown and dark brown very gravelly sandy loam about 23 inches thick. The lower part is olive brown very gravelly sandy loam about 5 inches thick. A weakly cemented hardpan is at a depth of about 35 inches. Depth to the hardpan ranges from 20 to 40 inches. Included in this unit are small areas of soils that have a stony or bouldery surface layer and areas of McKenna soils, Norma soils, and Terric Medisaprists in drainageways on plains. Also included are small areas of Everett, Indianola, and Ragnar soils on terraces and outwash plains. Included areas make up about 15 percent of the total acreage. Permeability of this Alderwood soil is moderately rapid above the hardpan and very slow through it. Available water capacity is low. Effective rooting depth is 20 to 40 inches. Runoff is slow, and the hazard of water erosion is slight. A seasonal perched water table is at a depth of 18 to 36 inches from January to March. This unit is used mainly for urban development and as woodland. It is also used for hay and pasture Douglas -fir is the main woodland species on this unit. On the basis of a 100-year site curve, the mean site index is 142. On the basis of a 50-year site curve, the mean site index is 108. The mean annual increment at culmination (CMAI) for Douglas -fir at age 65 is 148 cubic feet per acre. Among the trees of limited extent are western redcedar, western hemlock, and red alder. Among the common forest under story plants are salal, evergreen huckleberry, Oregon -grape, brackenfern, and western swordfem. This unit is well suited to year-round logging. Logging roads require suitable surfacing for year-round use. Rock for road construction is not readily available on this unit, but gravel is available in areas of adjacent Everett soils. Brush competition is the main limitation for the production of timber. Reforestation can be accomplished by planting Douglas -fir seedlings. If seed trees are present, natural reforestation of cut over areas by red alder occurs periodically. When openings are made in the canopy, invading brushy plants, if not controlled, can prevent the, establishment of seedlings. Because the rooting depth is restricted by a cemented pan, trees are subject to windthrow. This unit is suited to hay and pasture. The main limitations are the low available water capacity and the weakly cemented hardpan, which limits the use of the soil in this unit for deep-rooted plants. Grazing when the soil is wet results in compaction of the surface layer, poor tilth, and excessive runoff. The main limitations for homesites and septic tank absorption fields are the depth to the weakly cemented hardpan and wetness because of seasonal high water table. Effluent from absorption fields flows laterally above the hardpan and may seep at the bottom of slopes. Drainage is needed if buildings with basements and crawl spaces are constructed. During construction, disturbed areas need to be seeded and runoff controlled to protect the soil from erosion. Temporary sediment basins can be used in construction areas to reduce the amount of sediment in runoff water. This map unit is i,n capability subclass lVe. Lovell-Sauerfand and Associates O'Reilly Auto Parts Final Engineering and Drainage Report 23005 Highway 99 LSA No. 5331 September 2011 G-3 ROBINSON NOBLE April 23, 2010 Mr. Curt McNay O'Reilly Auto Parts 233 South Patterson Springfield, MO 65802 Geotechnical Engineering Report Proposed O'Reilly Auto Parts 23005 SR99 Edmonds, WA RN File No: 2587-001A Dear Mr. McNay; This letter transmits three copies of our report for your proposed O'Reilly Auto Parts store located at 23005 State Route 99 in Edmonds, Washington. The scope of our services is outlined in our Services Agreement dated April 7, 2010. We consider the site to be compatible for the planned store. The core of the site is underlain by glacial till (hardpan) which can provide adequate support for the structure. Some loose undocumented fill was encountered along the southeast side of the building down to an approximate depth of 9 feet. The fill can be removed and replaced with structural fill to support the east side of the building. Our Geotechnical Engineering Report discusses methods to prepare the site for your planned structure in detail. We appreciate the opportunity of working with you on this project. If you have any questions regarding this report, pleasei contact us. Sincerely, Rick B. Powell Principal Engineer I<WB:RBP:am cc: Dale M. Allison, ATC-Director, National Client Management www.robinson-noble.coni -,Z'. 14 N-/ TABLE OF CONTENTS INTRODUCTION........................................................................................................................................... 1 PROJECTDESCRIPTION .............................................................................................................................. 1 SCOPE........................................................................................................................................................... 1 SITECONDITIONS ........................................................................................................................ ............... 2 SurfaceConditions ..................................................................................................................................... 2 Geology...................................................................................... ... .. I .............. I .... I .......... I ............................ 3 Explorations.................................................................. I ............................................................................. 4 SubsurfaceConditions ............................................................................................................................. 4 HydrologicConditions ............................................................................................................................... 5 LabTesting ................................................................................................................................................. 5 GEOLOGICHAZARDS .................................................................................................................................. 6 ErosionHazard .......................................................................................................................................... 6 SeismicHazard ............................................................................... ....... —'— ..... *'*'***""* 6 CONCLUSIONS AND RECOMMENDATIONS ............................................................................................. 7 General...................................................................................................................................................... 7 SitePreparation and Grading ................................................................................................................... 8 StructuralFill ............................................................................................................................................. 8 General.................................................................................................................................................... 8 Materials.............. .................................. I .............................................................................................. 9 FillPlacement ......................................................................................................................................... 9 Temporary and Permanent Slopes ......................................................................................................... 10 Foundations............................................................................................................................................. 11 Drainage................................................................................................. I ................................................. 12 Utilities..................................................................................................................................................... 13 PavementSubgrade ................................................................................................................................ 13 CONSTRUCTION OBSERVATION ............................................................................................................. 14 USEOF THIS REPORT ............................................................................................................................... 14 Robinson Noble, Inc INTRODUCTION This report presents the results of our geotechnical engineering investigation at your proposed O'Reilly Auto Parts store located at 23005 State Route 99 in Edmonds, Washington.. The project is located at the southeast corner of SR 99 and 230" Street Southwest as shown on the Vicinity Map in Figure 1. You have requested that we complete this report to evaluate subsurface conditions and provide recommendations for site development. For our use in preparing this report, we have been provided with a site plan showing the proposed building and parking lot, dated March 4, 2010 and a Land Title Survey and Topographic Survey, dated February 24, 2010, prepared by Huitt-Zoliars. PROJECT DESCRIPTION The project will consist of a single story square commercial building with dimensions of approximately 85 feet, located in the southeastern portion of the lot. A parking lot is planned on the west and north sides of the structure. We have not been provided with a grading plan, but we understand that site grading will include minor cuts and fills to create the parking lot. SCOPE The purpose of this study is to explore and characterize the subsurface conditions and present recommendations for site development. Specifically, our scope of services as outlined in our Services Agreement, dated April 7, 2010, includes the following: Review available geologic maps for the site. 2. Contact the free utility locate service to have the locations of underground utilities marked where they enter the site. Retain a utility locator to mark the on -site utilities with the exception of non-metallic pipes, which cannot be detected by this service. To reduce the likelihood of damaging on -site underground utilities during our explorations, you should inform us of the location of any of these utilities. We cannot be held responsible for any damage to unmarked utilities. 3. Explore the site subsurface soil and groundwater conditions with four borings. to a depth of approximately 15 feet. Haul the drill cuttings away and dispose of them off -site. Drilling contractor to be provided by us. Robinson Noble, Inc H-3 Geotechnical Engineering Report O'Reilly Auto Part Store 23005 State Route #99 Edmonds, Washington RN File No. 2587-001 A April 23, 2010 Page 2 4. Evaluate pertinent physical and engineering characteristics of the soils encountered in the borings based on the results of the borings and our experience. Conduct laboratory tests consisting of two grain -size distribution and about ten moisture content determinations. 5. Prepare a geotechnical report containing the results of our subsurface explorations, boring logs, site plan, and our conclusions and recommendations for geotechnical design elements of the project. Our report will include: Description of the geologic materials encountered. Description of depth to groundwater, if encountered. Discussion of seismicity at the site along with seismic design parameters including Site Class and site coefficients based on current IBC criteria. Liquefaction analyses for the subsurface soil conditions. Recommendations for foundation design. Estimate the total and differential settlements Comment on any anticipated construction difficulties identified from the results of our site studies and from our experience on projects at similar sites. SITE CONDITIONS Surface Conditions The irregular shaped project site Is 0.997 acres in size and has maximum dimensions of approximately 205 feet in the east -west direction and 280 feet in the north -South direction. Access to the site is provided by 230" Street Southwest along the north side of the site and via State Route 99 along the west side of the site. Existing commercial property borders the site to the south and east. A driveway separates the southern edge of the project from existing commercial property. The majority of the site slopes gently down to the northeast at approximately 4 percent. There are slopes at the southern edge, the east side and in the northeast corners of the property. The slopes decline down to the neighboring properties and are on the order of 3 Robinson Noble, Inc H-q Geotechnical Engineering Report O'Reilly Auto Part Store 23005 State Route #99 Edmonds, Washington RN File No. 2587-001A April 23, 2010 Page 3 to 5 feet tall. The slopes are inclined at roughly 3 Horizontal to 1 Vertical (3H:1V) to 5H: 1 V. An abandoned single story structure occupies the center of the property. Access to the structure is provided by a gravel driveway off of State Route 99. The flat area and slopes of the site are well vegetated with grass, scotch brush, blackberry bushes and various other types of vegetation Geology Most of the Puget Sound Region was affected by past intrusion of continental glaciation. The last period of glaciation, the Vashon Stade of the Fraser Glaciation, ended approximately 10,000 to 11,000 years ago. Many of the geomorphic features seen today are a result of scouring and overriding by glacial ice. During the Vashon Stade, areas of the Puget Sound region were overridden by over 3,000 feet of ice. Soil layers overridden by the ice sheet were compacted to a much greater extent than those that were not. Part of a typical glacial sequence includes glacial till. Glacial till is an unsorted mixture of sand, silt, and gravel that was deposited below the glacier, and is commonly referred to as "hardpan." The glacial till has been consolidated under the weight of the glacier and exhibits both high strength and low permeability. Our site explorations encountered glacial till overlain by fill. The geologic units for this area are mapped on the Preliminary Surficial Geologic Map of the Edmonds East and Edmonds West Quadrangles, Snohomish and King Counties, Washington, by Mackey Smith (U.S. Geological Survey, 1975). The site is mapped as being underlain by a deposit of Vashon Till. Vashon Till is described as poorly sorted, nonstratified lodgment till deposited as ground moraine. It is composed of a mixture of clay, silt, sand, pebbles, cobbles and occasional large boulders. It is extremely compact and lacks surficial cracks or joints. Robinson Noble, Inc H-5 Geotechnical Engineering Report O'Reilly Auto Part Store 23005 State Route #99 Edmonds, Washington RN File No. 2587-001A April 23, 2010 Page 4 Explorations We explored subsurface conditions within the site on April 12, 2010, by drilling four borings with a truck mounted hollow stem auger drill rig. The borings were drilled to depths of 15 feet below the ground surface. Samples were obtained from the borings at 5-foot intervals by driving a split spoon sampler with a 140-pound hammer dropping 30 inches. The number of blows required for penetration of three 6-inch intervals was recorded. If the number of blows reached 50 before the sampler was driven through any 6-inch interval, the sampler was not driven further. To determine the standard penetration number at that depth the number of blows required for the lower two intervals are summed. The borings were located in the field by an engineer from this firm who also examined the soils and geologic conditions encountered, and maintained logs of the borings. T he approximate locations of the borings are shown on the Site Plan in Figure 2. The soils were visually classified in general accordance with the Unified Soil Classification System, a copy of which is presented as Figure 3. The logs of the borings are presented in Figures 4 through 7. Subsurface Conditions A brief description of the conditions encountered in our explorations is included below. For a more detailed description of the soils encountered, review the boring logs in Figures 4 through 7. Borings 1 and 2: Our explorations on the southern and eastern corners of the planned building encountered approximately 9 feet of undocumented loose to medium dense fill. The upper 1 to 1 Y2 feet consisted of bark and wood chips. The remainder of the fill in Boring 1 consisted of dark brown to black silty sand with organics and gravel and brown fine to coarse sand with silty clay and gavel. The fill below the wood chips and bark in Boring 2 consisted of organic silt with wood debris as well as silty sand with organics and silt. Dense to very dense glacial till was observed near the 9 foot depth in both Boring 1 and 2 and was observed down to the final depth explored of 15 feet. Robinson Noble, Inc Geotechnical Engineering Report O'Reilly Auto Part Store 23005 State Route #99 Edmonds, Washington RN File No. 2587-001A April 23, 2010 Page 5 Borings 3 and 4: Significantly less fill was observed in the borings located near the center of the western side of the planned building and in the northern portion of the planned parking lot. A foot of medium dense crushed rock was encountered at the surface of Boring 3. Roughly 3 feet of wood chips was encountered at the surface of Boring 4. In both borings, very dense glacial till was encountered below the upper layer of crushed rock and wood debris. The till was observed down to the final depth of 15 feet. Hydrologic Conditions With the exception of some slight groundwater seepage near the 13 foot depth in Boring 2, groundwater was not encountered. The bark, wood chips and the organic silt at the 2.5 to 4.0 foot depth in Boring 2 were wet. The glacial till in Borings 3 and 4 had moisture contents less than 10 percent and the till in Borings 1 and 2 had moisture contents between 9 and 16 percent. The dense to very dense till int erpreted to underlie the site is considered poorly draining. During the wetter times of the year, we expect perched water conditions will occur as pockets of water on top of the till layer. Perched water does not represent a regional groundwater "table" within the upper soil horizons. Volumes of perched groundwater vary depending upon the time of year and the upslope recharge conditions. Lab Testing Moisture Content Evaluation: Samples were obtained in the field during the exploration process, properly sealed in plastic bags and then promptly taken to the lab to determine the moisture content. The moisture content for each sample was determined by firs t weighing the moist soil sample and then baking the moisture out of the sample to determine the weight of water within the sample. The moisture content is the result of dividing the weight of the water by the weight of the dry soil after baking. The results are shown on the Boring Logs in Figures 4 through 7. Wet Sieve Analyses: Wet sieve analyses were performed to determine the grain size Robinson Noble, Inc H-7 Geotechnical Engineering Report O'Reilly Auto Part Store 23005 State Route #99 Edmonds, Washington RN File No. 2587-001A April 23, 2010 Page 6 distribution of two of the soil samples. One was performed on the glacial till encountered at the bottom of Boring 4 and the other was performed on the undocumented fill which was at the 8 foot depth in Boring 1. We chose to perform the grain size analysis on the fill because it visually appeared suitable to be used as structural fill onsite and the test confirmed that. We performed the sieve analyses in general accordance with ASTM D 422 and the results are shown in Figures 8 and 9. GEOLOGIC HAZARDS Erosion Hazard The erosion hazard criteria used for determination of affected areas includes soil type, slope gradient, vegetation cover, and groundwater conditions. The erosion sensitivity is related to vegetative cover and the specific surface soil types (group classification), which are related to the underlying geologic soil units. We reviewed the Soil Survey of Snohomish County Area, Washington by the Soil Conservation Service (SCS) to determine the erosion hazard of the on -site soils. The site surface soils were classified using the SCS classification system as Alderwood-Urban Land Complex, 2 to 8 percent slopes (Unit 5). The corresponding geologic unit for these soils is till, which is in agreement with the soils encountered in our site explorations. The erosion hazard for the soil is listed as being slight for the gently sloping conditions at the site. Seismic Hazard It is our opinion based on our subsurface explorations that the Soil Profile in accordance with Table 1613.5.2 of the 2006 International Building Code (IBC) is Site Class C. As referenced in the 2006 IBC, we used the US Geological Survey program "Seismic Hazard Curves and Uniform Hazard Response Spectra." That program uses 2003 NEHRP Seismic Design Provisions to obtain values for S.,, S1, F., and F,. The seismic design parameters are: S. 119.6% g Robinson Noble, Inc H-e Geotechnical Engineering Report O'Reilly Auto Part Store 23005 State Route #99 Edmonds, Washington RN File No. 2587-001A April 23, 2010 Page 7 S, 41.8% g F. 1.0 F, 1.4 Site specific coefficients and adjusted maximum considered earthquake spectral response acceleration parameters apply as shown in Section 1613.5 of the IBC. Based on the USGS data and Tables 1613.5.60) and (2), the site has Seismic Design Category D. - Additional seismic considerations include liquefaction potential and amplification of ground motions by soft soil deposits. The liquefaction* potential is highest for loose sand with a high groundwater table. The underlying dense till is considered to have a very low potential for liquefaction and amplification of ground motion. CONCLUSIONS AND RECOMMENDATIONS General It is our opinion that the site is compatible with the planned development. The underlying dense to very dense glacial till deposits are capable of supporting the planned structure and pavements. We recommend that the loose fill be removed from the building footprint and then backfilled with structural fill. Please refer to the Structural Fill section for recommendations for fill placement. The foundations should bear on the underlying native glacial till, or on structural fill extending to these soils. Based on our site explorations, we anticipate these soils will generally be encountered at the 9 foot depth on the east side of the planned building and at typical footing depths on the west side of the planned building. The soils likely to be exposed during construction are highly moisture sensitive and will disturb easily when wet or during wet conditions. We recommend that construction take place during the drier summer months, if possible. If construction takes place during the wet season, additional expenses and delays should be expected due to the wet conditions. Additional expenses could include costs for an increased depth of site stripping, export of Robfnson Noble, Inc H - I Geotechnical Engineering Report O'Reilly Auto Part Store 23005 State Route #99 Edmonds, Washington RN File No. 2587-001A April 23, 2010 Page 8 on -site soil, the import of clean granular soil for fill, and the need to place a blanket of rock spalls in the access roads and paved areas prior to placing structural fill. Site Preparation and Grading The first step of site preparation should be to strip the vegetation, topsoil, or loose soils to expose medium dense or firmer native soils in pavement and building areas. The excavated material should be removed from the site, or stockpiled Jor later use as landscaping fill. The resulting subgrade should be compacted to a firm, non-Vielding condition. Areas observed to pump or yield should be repaired prior to placing hard surfaces. The on -site glacial till likely to be exposed during construction is considered highly moisture sensitive, and the surface will disturb easily when wet. We expect these soils would be difficult, if not impossible, to compact to structural fill specifications in wet weather. We recommend that earthwork be conducted during the drier months. Additional expenses of Wet weather or winter construction could include extra excavation and use of imported fill or rock spalls. During wet weather, alternative site preparation methods may be necessary. These methods may include utilizing a smooth -bucket trackhoe to complete site stripping and diverting construction traffic around prepared subgrades. Disturbance to the prepared subgrade may be minimized by placing a blanket of rock spalls or imported sand and gravel in traffic and roadway areas. Cutoff drains or ditches can also be helpful in reducing grading costs during the wet season. These methods can be evaluated at the time of construction. Structural Fill General: All fill placed beneath buildings, pavements or other settlement sensitive features should be placed as structural fill. Structural fill, by definition, is placed in accordance with prescribed methods and standards, and is observed by an experienced geotechnical professional or soils technician. Field observation procedures would include the Robinson Noble, Inc M-149 Geotechnical Engineering Report O'Reilly Auto Part Store 23005 State Route #99 Edmonds, Washington RN File No. 2587-001 A April 23, 2010 Page 9 performance of a representative number of in -place density tests to document the attainment of the desired degree of relative compaction. Materials: Imported structural fill should consist of a good quality, free -draining granular soil, free of organics and other deleterious material, and be well graded to a maximum size of about 3 inches. Imported, all-weather structural fill should contain no more than 5 percent fines (soil finer than a Standard U.S. No. 200 sieve), based on that fraction passing the U.S. 3/4-inch sieve. The use of on -site soil as structural fill will be dependent on moisture content control. Some drying of the native soils may be necessary in order to achieve compaction. During warm, sunny days this could be accomplished by spreading the material in thin lifts and compacting. Some aeration and/or addition of moisture may also be necessary. We expect that compaction of the native soils to structural fill specifications would be difficult, if not Impossible, during wet weather. Fill Placement: Following subgrade preparation, placement of the structural fill may proceed. Fill should be placed in 8- to 10-inch-thick uniform lifts, and each lift should be spread evenly and be thoroughly compacted prior to placement of subsequent lifts. All structural fill underlying building areas, and within a depth of 2 feet below pavement and sidewalk subgrade, should be compacted to at least 95 percent of its maximum dry density. Maximum dry density, in this report, refers to that density as determined by the ASTM D1557 compaction test procedure. Fill more than 2 feet beneath sidewalks and pavement subgrades should be compacted to at least 90 percent of the maximum dry density. The moisture content of the soil to be compacted should be within about 2 percent of optimum so that a readily compactable condition exists. It may be necessary to overexcavate and remove wet surficial soils in cases where drying to a compactable condition is not feasible. All compaction should be accomplished by equipment of a type and size sufficient to attain the desired degree of compaction. Robinson Noble, Inc ff-// Geotechnical Engineering Report O'Reilly Auto Part Store 23005 State Route #99 Edmonds, Washington RN File No. 2587-001A April 23, 2010 Page 10 Temporary and Permanent Slopes Temporary cut slope stability is a function of many factors, such as the type and consistency of soils, depth of the cut, surcharge loads adjacent to the excavation, length of time a cut remains open, and the presence of surface or groundwater. It is exceedingly difficult under these variable conditions to estimate a stable temporary cut slope geometry. Therefore, it should be the responsibility of the contractor to maintain safe slope configurations, since the contractor is continuously at the job site, able to observe the nature and condition of the cut slopes, and able to monitor the subsurface materials and groundwater conditions encountered. For planning purposes, we recommend that temporary cuts made around the eastern perimeter of the planned building footprint be no steeper than 1.5 Horizontal to 1 Vertical (1.51H:1V). Cuts in the dense to very dense till may stand at a 0.75H:1V inclination or possibly steeper. If groundwater seepage is encountered, we would expect that flatter inclinations would be necessary. We recommend that cut slopes be protected from erosion. Measures taken may include covering cut slopes with plastic sheeting and diverting surface runoff away from the top of cut slopes. We recommend that cut slope heights and inclinations conform to local and WISHA/OSHA standards. Final slope inclinations for granular structural fill and the native soils should be no steeper than 2H:1V. Lightly compacted fills, common fills, or structural fill predominately consisting of fine grained soils should be no steeper than 3H:1V. Common fills are defined as fill material with some organics that are "trackrolled" into place. They would not meet the compaction specification of structural fill. Final slopes should be vegetated and covered with straw or jute netting. The vegetation should be maintained until it is established. Robinson Noble, Inc ty- /7- Geotechnical Engineering Report O'Reilly Auto Part Store 23005 State Route #99 Edmonds, Washington RN File No. 2587-001 A April 23, 2010 Page 11 Foundations Conventional shallow spread foundations should be founded on undisturbed till or structural fill extending down to the till. If the soil at the planned bottom of footing elevation is not suitable, it should be overexcavated to expose suitable bearing soil. We recommend Ahat the overexcavation be wider than the building footprint. The amount the overexcavation should be wider depends on the depth of the overexcavation. We recommend that the width from the outer edge of the footing be at least half of the depth of the overexcavation. For example, if 8 feet of soil needs to be removed beneath a footing to reach the dense native till, then the excavation should extend at least 4 feet beyond the outer edge of the footing. The overexcavation should th en be backfilled with structural fill as described in the above sections. Footings should extend at least 18 inches below the lowest adjacent finished ground surface for frost protection. Minimum foundation widths should conform to IBC requirements. Standing water should not be allowed to accumulate In footing trenches. All loose or disturbed soil should be removed from the foundation excavation prior to placing concrete. For foundations constructed as outlined above, we recommend an allowable design bearing pressure of 2,000 pounds per square foot (psf) be used for the footing design. IBC guidelines should be followed when considering short-term transitory wind or seismic loads. Potential foundation settlement using the recommended allowable bearing pressure is estimated to be less than 1-inch total and 1/2-inch differential between footings or across a distance of about 20 feet. It is important to. compact the structural fill within the building area to a bove *project specifications to reduce differential settlement across the building. The above foundations may be resisted by friction at the base of the wall and passive resistance against the foundation. A coefficient of friction of 0.5 may be used to determine the base friction in the native glacial soils. An equivalent fluid density of 250 pcf may be used for passive resistance design. To achieve this value of passive pressure, Robinson Noble, Inc Y-13 Geotechnical Engineering Report O'Reilly Auto Part Store 23005 State Route #99 Edmonds, Washington RN File No. 2587-001A April 23, 2010 Page 12 the foundations should be poured "neat" against the native dense soils, or compacted fill should be used as backfill against the front of the footing, and the soil in front of the wall should extend a horizontal distance at least equal to three times the foundation depth. A factor of safety of 2.0 has been applied to the passive pressure to account for required movements to generate these pressures. The friction coefficient does not include a factor of safety. Slabs -On -Grade Slab -on -grade areas should be prepared as recommended in the Site Preparation and Grading subsection. Slabs should be supported on medium dense or firmer native soils, or on structural fill extending to these soils. Where moisture control is a concern, we recommend that slabs be underlain by 6 inches of pea gravel for use as a capillary break. A suitable vapor barrier, such as heavy plastic sheeting, should be placed over the capillary break. An additional 2-inch-thick damp sand blanket can be used to cover the vapor barrier to protect the membrane and to aid in curing the concrete. This will also help prevent cement paste bleeding down into the capillary break through joints or tears in the vapor barrier. The capillary break material should be connected to the footing drains to provide positive drainage. Drainage We recommend that runoff from impervious surfaces, such as roofs, driveway and access ro adways, be collected and routed to an appropriate storm water discharge system. The finished ground surface should be sloped at a gradient of 5 percent minimum for a distance of at least 10 feet away from the buildings, or to an approved method of diverting water from the foundation, per IBC Section 1803.3. Surface water should be collected by permanent catch basins and drain lines, and be discharged into a storm drain system. We recommend that footing drains be used around all of the structures where moisture control is important. It is good practice to use footing drains installed at least 1 foot below the planned finished floor slab to provide drainage. Footing drains should discharge into tightlines leading Robinson Noble, Inc H-ly Geotechnical Engineering Report O'Reilly Auto Part Store 23005 State Route #99 Edmonds, Washington RN File No. 2587-001A April 23, 2010 Page 13 to an appropriate collection and discharge point. For slabs -on -grade, a drainage path should be provided from the capillary break material to the footing drain system. Roof drains should not be connected to wall or footing drains. Our experience with gently -sloping till sites is that the volume of water collected by commercial building foundation drains and routed to the stormwater detention system is insignificant when considered in the storm drainage design. We do not expect that the foundation drain water will impact the design of the stormwater detention system. Utilities Our explorations indicate that deep dewatering will not be needed to install standard depth utilities. Anticipated groundwater is expected to be handled with pumps in the trenches. We also expect that some groundwater seepage may develop during and following the wetter times of the year. We expect this seepage to mostly occur in pockets. We do not expect significant volumes of water in these excavations. The soils likely to be exposed in utility trenches after site'stripping are considered highly moisture sensitive. We recommend that they be considered for trench backfill during the drier portions of the year, provided these soils are within 2 percent of their optimum moisture content and are suitable to meet compaction specifications. During the wet season, it may be difficult to achieve compaction specifications; therefore, soil amendment with kiln dust or cement may be needed to achieve proper compaction with the on -site materials. The amount of organics encountered will also determine if onsite soil can be used or if imported materials are needed. Additional overexcavation may be needed in areas to confirm the utilities are supported on native bearing soil or structural fill extending to these soils. Pavement Subgrade The performance of roadway pavement is critically related to the conditions of the underlying subgrade. We recommend that the subgrade soils within the roadways be IRobinson Noble, Inc H-t5* Geotechnical Engineering Report O'Reilly Auto Part Store 23005 State Route #99 Edmonds, Washington RN File No. 2587-001 A April 23, 2010 Page 14- prepared as described in the Site Preparation and Grading subsection of this report. Prior to placing base material, the subgrade soils should be compacted to a non -yielding state with a vibratory roller compactor and then proof -rolled with a piece of heavy construction equipment, such as a fully -loaded dump truck. Any areas with excessive weaving or flexing should be overexcavated and recompacted or replaced with a structural fill or crushed rock placed and compacted in accordance with recommendations provided in the Structural Fill subsection of this report. An alternative to complete removal of all the existing fill would be to remove the upper 2 feet in the pavement areas and compact the existing surface. if the existing fill can be compacted to a dense state, then 2 feet of granular import could be placed for the pavement section. If this method is used, there is some additional risk of settlement in the pavement area. Additional maintenance would be expected. The amount of fill removed and the degree of compaction will reduce the risks. CONSTRUCTION OBSERVATION We should be retained to provide observation and consultation services during construction to confirm that the conditions encountered are consistent with those indicated by the explorations, and to provide recommendations for design changes, should the conditions revealed during the work differ from those anticipated. As part of our services,'we would also evaluate whether or not earthwork and foundation installation activities comply with contract plans and specifications. USE OF THIS REPORT We have prepared this report for O'Reilly Auto Parts and its agents, for use in planning and design of this project. The data and report should be provided to prospective contractors for their bidding and estimating purposes, but our report, conclusions and interpretations should not be construed as a warranty of subsurface conditions. Robinson Noble, Inc H-16 Geotechnical Engineering Report O'Reilly Auto Part Store 23005 State Route #99 Edmonds, Washington RN File No. 2587-001A April 23, 2010 Page 15 The scope of our services does not include services related to construction safety precautions, and our recommendations are not intended to direct the contractors' methods, techniques, sequences or procedures, except as specifically described in our report, for consideration in design. There are possible variations in subsurface conditions.. We recommend that project planning include contingencies in budget and schedule, should areas be found with conditions that vary from those described in this report. Within the limitations of scope, schedule and budget for our services, we have strived to take care that our services have been completed in accordance with generally accepted practices followed in this area at the time this report was prepared. No other conditions, expressed or implied, should be understood. 000 0 Robinson Noble, Inc H-/7 N Geotechnical Engineering Report O'Reilly Auto Part Store 23005 State Route #99 Edmonds, Washington RN File No, 2587-001A April 23, 2010 Page 16 We appreciate the opportunity to be of service to you. If there are any questions concerning this report or if we can provide additional services, please call. Sincerely, Robinson Noble, Inc. 4, m Kevin Boekholt, EIT Project Engineer Rick B. Powell, PE Principal Engineer KWB:RBP:am Three Copies Submitted Nine Figures Information about this Geotechnical Engineering Report cc: Dale M. Allison, ATC - Director, National Client Management Robinson Noble, InG H-18 Vicinity Map 00 2201 H PL S14 ST 221ST PL Sjj 5NI 221SI 2�15 - �Nl 222N� 5T S14 I'L SW ST sw > �JA L Oh �;C TI,/ 2Z22lq4,,) CD Co 223RD PARK Cli 22211D� -!PL S11 ------- ST —I S1.1 SA"'Ot I 223RD 131. 511 SW pvc, 224 ST Sow& CHRWINI 225TH ST= E!", 1i I PL siv Col. I fila 56, I svi 225TH 22411 225TH 225TH �Z S11 §J fl.1-i It PL S—�Fj isq, Sul H SVI -'1226TH' pt sk, 227;,, S T SW PL ST �J, 227Tn ST 1 Al 228TH Si ?28TM ST w ST S14 I 228TH 7700 ,6100 22 < 2291H I 9TH < =::17- �?q PL Sli i�, OT/ S 11 23 < < ski 1;0 t 230TH ST 230TH Projec Sw > 7-;; 23 OTH IV Site M S111 T 7- 23214D -ST - -i- - , - -- - LID 232ND ST S1.1 i Lo 7-r sti, S14 PL C0 F�j- S 1P 3H S El fa Aff PO i SRO Si sil 2.3211D PL 5w, r1r C- N. SW �Sp @2005 Thornas Bros. MaPSI g 631PRO Address: 23005 SR 99, Edmonds, WA ROBINSON L— NOBLE 17625-130th Ave NE, C-102 - Phone: (425) 488-0599 O'Reilly Auto Parts Fax: (425) 488-2330 File Number Figure 2587-001A 1 'oodinIville, WA - 98072 1 14- 1 C1 Site Plan 0 OT IA1 Cj IW44r 41 4e LM 67 3 F3 B-2 0 13 A LEGEND B-1 Number and Approximate Location of Soil Boring 1 0 50 100 Scale 1" = 60' Reference: Based on site plan provided by O'Reilly Auto Parts, dated 03-04-2010 Phone: (425) 488-0599 O'Reilly Auto Parts - 23005 S R99 Edmonds, WA Fax: (425) 488-2330 ROBINSON File Number 2587-001A I F1,ure 2 NOBLE 17626-i3Oth Ave NE, C-102 - Woodinville, WA - 98072 H--w UNIFI . ED SOIL CLASSIFICATION SYSTEM MAJOR DIVISIONS GROUP GROUPNAME SYMBOL GRAVEL GW WELL -GRADED GRAVEL, FINE TO COARSE GRAVEL COARSE- CLEAN GRAVEL GP POORLY -GRADED GRAVEL GRAINED MORE THAN 50% OF GM SILTY GRAVEL COARSE FRACTION GRAVEL SOILS RETAINED ON NO. 4 WITH FINES SIEVE GC CLAYEY GRAVEL SAND CLEAN SAND sw WELL -GRADED SAND, FINE TO COARSE SAND MORE THAN 60% SID POORLY -GRADED SAND RETAINED ON S M SILTY SAND NO. 200 SIEVE MORE THAN 50% OF COARSE FRACTION PASSES NO. 4 SIEVE SAND . SC CLAYEY SAND WITH FINES FINE - SILT AND CLAY INORGANIC ML SILT CL CLAY GRAINED SOILS LIQUID LIMIT LESS THAN 50% ORGANIC OL ORGANIC SILT, ORGANIC CLAY SILTAND CLAY INORGANIC MH SILT OF HIGH PLASTICITY, ELASTIC SILT CH CLAY OF HIGH PLASTICITY, FAT CLAY MORETHAN50% ORGANIC OH ORGANIC CLAY. ORGANIC SILT PASSES NO. 200 SIEVE LIQUID LIMIT 50% OR MORE HIGHLY ORGANIC SOILS PT NOTES: SOIL MOISTURE MODIFIERS 1) Field classification Is based on Dry- Absence of moisture, dusty, dry visual examination or soli In general to the touch accordance with ASTM D 24 88-93. Moist- Damp, but no visible water 2) Sall classification using laboratory tests Is based on ASTM D 2487-93. Wet- Visible free water or saturated, 3) Descriptions of soil density or usually soil Is obtained from consistency are bas . ad on below water table Interpretation of blowcount data, visual appearance, of soils. and/or test data. Modifications have been applied to ASTM methods to describe sit and clay content. KEY TO BORING LOG SYMBOLS — Letter symbol for soil type Contact between soil strata — (Dashed fine Indicates approximate contact between soils) Ground water level — Letter symbol to . r soil type 0 Blows required to drive sample 12 In. using SPT MC (13) c % Moisture = riftlilbi of water) (Welgig of dry soil) DD = Dry Density NOTE: The stratification lines represent the approximate boundaries between soil types and the transition may be gradual Soil Classification and Phone: 425�488-0599 �425, Boring Log Key Fax: 488-2330 ROBINSON' NOBLE 17625-1130th Ave NE, Suite 102 - Woodinville, WA- 98072 Figure 3 H-7.1 Date 411212010 Hole diameter 8" B-1 Logged by Kw8 Hole depth is, Driller Holocene Well diameter NIA Page 1 of 1 Elevation Well depth N/A LITHOLOGY / DESCRIPTION 6 yj :3 Sample i� 0 ?0- W Static Water Level :z:z 0 Standard Penetration Resistance (140 lb. weight, 30" drop) 0 Blows per foot Moisture Content 0 10 20 30 40 50 50+ BARK and WOOD CHIPS (FILL) ... .. . .. . .. ...... .. ......... ...... .. ........ .... .... .... . . ....... Brown fine to coarse SAND with gravel (EILL) AF . .............. SW 2— 3— 4— 5— 6- 7— 8— 9— 10 . 12- 13— 14— 15— 16- 17- 18- 19— 20— 21- 22- 23- 24 25 . 67% rq q ........................................ .......... ...... .............. ...................... I ... ... ---------- : ---------- ......... -------.................... -------------------- .................. ..................... ........................................................... Dark brown to black SILTY fine to coarse SAND With organics and gravel (Loose, Moist) (FILL) Brown fine to coarse SAND with silty clay and gravel (Loose, Moist) (FILL) S M SW -SC Dense GRAVEL encountered Brown SILTY fine to coarse SAND with gravel (Dense, Moist) (TILL) Sm am Ogg Boring 2 complete at 15feet on4 12 010 Groundwater seepage was not encountered Phone: (425) 488-0599 Fax: (425) 488-2330 ROBINSON' NOBLE 17625-130 Ave NE, Suite 102 - Woodinville, WA - 98032 O'Reilly Auto Parts - 23005 SR99 Edmonds, WA File Number 2587-0=01A 1gure 4 9-2.2. Date 4/12/2010 Hole diameter 8.. B-2 Logged by KWB Hole depth 15, Driller Holocene Well diameter N/A Page 1 of I Elevation Well depth NIA LITHOLOGY / DESCRIPTION 6 (6 :5 Sample 0 U 0 Static Water Level CL Standard Penetration Resistance (140 lb. weight, 30" drop) 0 Blows per foot 0 Moisture Content 0 10 20 30 40 50 50+ BARK and WOOD CHIPS (FILL) ........................................................................................................................... Dark brown to black ORGANIC SILT with wood debris and fine to medium sand (Soft, Wet) (EILL) ........................................................................................................................... Gary SILTY fine SAND with organics and silt (Medium Dense, Moist) (FILL) AF .......... OL ........... SM 2— 3— 4— 5— 6- 7— 8— 10 12- 13— 14— 15— 16- 17- 18- 19 20 — 21 22- 23- 24 25 . ......... ------- ......... .......... ...... ......................... . ..... 62 ...... --------- ------............... ......... -------- ----------- --------- ------------------------------------------ ..... ............................... .. 7— Dense GRAVEL encountered Gray SILTY fine to medium SAND with gravel (Very Dense, Moist) (TILL) SM 77�� 777 Boring 2 complete at 15 feet on 4/12/2010 Slight groundwater seepage near 13 feet Phone: (425) 488-0599 Fax: (425) 488-2330 ROBINSON NOBLE 17625-`130 Ave NE, Suite 102 - Woodinville, WA - 08032 O'Reilly Auto Parts - 23005 SR99 Edmonds, WA File Number 2587-OOIA F gure 1 5 H- 2.3 Date 4112/2010 Hole diameter 8" B-3 Logged by I'M Hole depth 15, Driller Holocene Well diameter NIA Page 1 of 1 Elevation Well depth NIA LITHOLOGY I DESCRIPTION 6 (6 :3 Sample 2� -@ e Static Water Level W Standard Penetration Resistance (140 lb. weight, 30" drop) 0 Blows per foot w Moisture Content 0 10 20 30 40 50 50+ CRUSH ROCK (Medium Dense,,Moist) (FILL) ...................................................................................................................... .... Brown SILTY fine to coarse SAND with pulverized gravel (Very Dense, Moist) (TILL) Gray SILTY fine to coarse SANDMth gravel (Very Dense, Moist) (TILL) Gray SILTY fine to coarse SAND with gravel (Very Dense, Moist) (TILL) GW ....... SM SM Sm 2— 3— 4- 5 . 6 7— 8— 9- 10— 12- 13� 14— 15— 17- 18- 19— 20- 21- 22- 23- 24- 25— ........ --------- ......... .................. ......... 92 .............................. .... ... .5 I ......... ........... ------- ................... .......... ........ ............................. Boring 3 complete at 15 feet on 4112/2010 Groundwater seepage was not encountered Phone: (426) 488-0599 Fax: (426) 488-2330 ROBINSON NOBLE 17625-130 Ave NE., Suite 102 - Woodinville, WA - 98032 O'Reilly Auto Parts - 23005 SR99 Edmonds, WA File Number 1 2587-001A Figure I Y-2y Date 4/12/2010 Hole diameter 8" B-4 Logged by KWE3 Hole depth 15, Driller Holocene Well diameter N/A Page I of 1 Elevation Well depth N/A LITHOLOGY / DESCRIPTION 6 Sample > Static water Level Standard Penetration Resistance (140 lb. weight, 30" drop) 0 Blows per foot iii Moisture Content 0 10 20 30 40 50 50+ WOOD CHIPS (From 0.0 to 2.7 foot depth) AF AF 2— 3 4 5 . 6- 7— 8— 10- 12— .13— 4- 15— 16- 17- 18- 19- 20— 21 22- 23- 24— 25- ......... ......... ......... I .......... ..... ....... ...... 88 ............................... .... ... 57 -b .......... ......... ......... ......... .................... ------------ ................... ..................... .. ...... Gray SILTY fine to coarse SAND with gravel (Dense, Moist) (TILL) Gray SILTY fine to coarse SAND with gravel (Very Dense, Moist) (TILL) Gray SILTY fine to coarse SAND with gravel (Very Dense, Moist) (TILL) S Sm Sm c 0-m-Flete at 16 feet on 4/1212010 Groundwater seepage was not encountered --.a ... A - Phone: (425) 488-0599 Fax: (425) 488-2330 ROBINSON NOBLE 17625-130 Ave NE. Suite 102 - Woodinville, WA - 98032 O'Reilly Auto Parts - 23005 SR99 Edmonds, WA File Number 2587-OOIA Figure I H-2 5 Grain Size Analysis U.S. Standard Sieve Opening- in Inches U.S. Standard Sieve Numbers Hydrometer Results 100% 20 6 4 3 1 Y. V. Y, V. #4 10 16 . 2030 40 50 IOD . 200 0% .... ........ ....... .......................... ............... ............ .............. ....... 90% ------ .. .... ....... ------------ ............... --------- .......... 1 ... ....... 10% ............... . . . .......... 4­1 ....... .............. ...... . ............................ 117-....' ..' ............. 80% - ........ ...... ............... .............. ..................... ............. 20% .................... ------ Z( 70% ........ ........ .......... 4­1 ......... ------ 30% ............. ......... ........ --------- ...... ------- ...... ......... _­ ....... ............... 40% 60% -------- *.,.-,. -------- ------ . . .......... : ------------ ........... ------ ------------ .0 50% - ............. ------ ........... .0 50% - A ..................... .. ............ ............... ............ ------- M 40% ...... ........... 60% r .... ............... ....... ........... ............ ------------- ----------- ------- ------- 70% aj 30%- ------ ...... . . ::: ! : : ! : ........... ...... ------------ ...... ......... ...... ............ 20% - ........ ------------------- ------------- - ------- ------­------ ---------- . ......... 1 ....... 80% ............... ............... N" .' ............ 0 10 Y( I -------- I ....... . ........ ........... ........... .... .. 90% .......... -------- ------- ....... 0% t 100% 1000 100 10 1 0.1 0.01 0.001 Grain Size In Millimeters 11 Cobbles L- I Gravels I Sands Silts I Clays I 1 11 I Coarse. I Fine I Co. I M Fine Date: 04/20/16 Sample #: Sample ID: Suitable Fill Source: Project: NUD Location: Boring #: B-1 Depth: 8.25 DIO = 0.07 Djo= 0.28 D"O = 0.80 Cc= 1.35 Cu. 11.45 Uquid Limit= n/a Plastic Limit= n1a Plasticity Index= n/a USCS Classification SW -SC, Well -graded Sand wi Specifications No Specs Sample Meets Specs No Fineness Modulus 2.80 % Gravel 15.8% 5�. Silt & Clay 103% % Sand 73.5% Coar-se ctuH n(cipoluted thies rc�a=�J ter-pora-7 Section Cumulative Cumulative Section Cumulative Cumulative Sieve Size Percent Percent Pcrccnl I Percent 1 Specs us Metri Passing Passing 1" Max Min us Passing Passing F Max Min 6.00" 150.00 100.0% #4 4.750 84.2% 84.2% 4 100.00 100.0% N8 2.360 72.7% 3.00" 75.00 100.0% #10 2.000 70.9% 70.9% 2.50" 63.00 100.0% #16 1.190 64.2% 2.00" 50.00 100.0% #20 0.850 61.5% 61.5% 1.75" 45.00 100.0% #30 0.600 53.2% 1.501, 37.50 100.0% #40 0.425 47.4% 47.4%. 1.251, 3 t.50 100.0% #50 0.300 32.8% 1.00" 25.00 100.0% V60 0.250 26.9% 26.9% 7/8" 22.40 100.0% #80 0.180 20.6% 3/4" 19.00 100.0% 1.100 0.150 17.9% 17.9% 518" 16.00 100.00/0 0140 0.106 13.7% 1/2" 12.50 98.7% 98.7% #170 1 0.090 12.1% 3/8" 950 94.9% 94.9% #200 0.075 10.7% 10.7% 114" 630 87.7% #270 0.0 53 114 4.75 84.2% 84.2% Cap)Tiqlu Spem Ensim PS. 1996-2005 17625 - 130th Ave NE, Suite 102 18019 25th Ave NE Robinson Noble, Ine. Woodinville WA, 98072 Figure 8 H-2(o Grain Size Analysis U.S. Standard Sieve Opening in Inches U.S. Standard Sieve Number-, Hydrometer Results 100% 90% 80% F- 70% 60% 50% C: 40% .-,! 3 0 % 20% 10% 0% 0% 10% 20% 30% wc 40% 50% 60% wc 70% Of 80% 90% 100% 1000 10 1 0.1 0.01 0.001 Grain Size in Millimeters 20 6, 4 3 17. 7, A 7. 04 IV 10 dV IV qu 0V . .. ... ...... - --------- .............. ------ ------ :T': ...... .......... ................ .. ...... ....... ------ ... ... 444.; ............... 17" ..... ... ------ .............. ............. ............ ... ....... ...... 17, 4- �14-114- ............ . . . . .. . . . . . . . . . ........... . . . . . . . . . . . . . . . . . . . ...... ............... 4- ------ ............... 4- - - - - - - - - - - - - - - - :4 1 Y. . . . . . . . . . .. . . . . . .......... I., . . . . . . . . . . . . . . . . . . . . . . . . . . . I - - - - - - - - - - I - - - - - - . . . . . . ............ . . . . . . . . . t- - - --- - - - - - - - - - - - - - - 11 1 1. 2. . . . . . . . . . . . . . . - - - - - - - - - - - - . . . . . .. . . . . . ... . . . . . . . . . . . . . - - - - - - . . . . . . . . . . . . . . . . . I - - - - - - - - - - - - - - - - - - - - . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . - - - - - - - - - - - - - - - - - - - - - - - -- L I . . . . . . . . . . . . . . . . . . . . . . . . 112 Cobbles Gravels Sands Silts Clays Coarsc I Fine I Co. I Medium Fine Date: 04/20/10 Sample #: Sample ID: TILL Source: Project: O'Reilly Auto Location: Boring #: B-4 Depth: 14.25 feet D10- 0.04 D30 - 0.21 D60 = 1.26 Cc - 0.79 C,- 29.67 Liquid Limit= n/a Plastic limit- nfa Plasticity Index- n1a USCS Classification SM. Silly Sand with Grav Specifications No Specs Sample Meets Specs No Fineness Modulus 2.96 % Gravel 23.1% % Silt & Clay 17.6% % Sand 59.3% Coarse Actual (c1po ( Fines Aetna nterpolated Section Cumulative Cumulative Section Cumulative Cumulative - 'K1-eTC7S-1ze - Percent Percent -3-PR-S- Specs - -Sievc Ske-- Percent Percent Specs us Metric Passing Passing Max Min us Metticl Passing Passing Max Min 6.00" 150.00 100.0% #4 4.750 76.9% 76.9% 4.00" 100.00 100.0% #8 2.360 67.1% 3.00" 75.00 100.0% #10 2.000 65.7% 65.7% 2.50" 63.00 100.0% #16 1.180 59.4% 2.00" 50.00 100.0% 420 0.850 56.8% 56.8% 1.751, 45.00 100.0% H30 0.600 50.6% 1,501, 37.50 100.0% #40 0.425 46.2% 46.2% 1.25" 31.50 100.0% Y50 0.300 37.1% 1.001, 25.00 100.0% #60 0,250 33A% 33.4% 7/8" 22.40 100.0% #so 0.180 27.9% 3/4" 19.00 100.0% #100 0.150 25.5% 25.5% 5/8" 16.00 100.0% #140 0.106 20.9% 112" 112,50 92,4% 92,4% #170 0.090 19.2% 3/8" 9.50 87.50/t 87.5% #200 0.075 17.6% 17.6% 1/4" 630 80.4% #270 0.053 H4 4.75 76.9% 76.9% IRobinson Noble, Inc. 17625 - 130th Ave NE, Suite 102 18019 25th Ave NE Woodinville WA, 98072 Figure 9 H-P (-- Geolechnical EfloineePIO-9 RePOPI ---) Geolechnical Services Ape Performed fop Specific Purposes, Persons, and Projects Geotechnical engineers structure their services to meet the specific needs of their clients. A gentechnical engineering study conducted [of a civil engi- neer may not fulfill the needs of a construction contractor or even another civil engineer. Because each geotechnical engineering study is unique, each geolechnical engineering report Is unique, prepared solelyfor the client. No one except you should fely on your geolechnical engineering. repel without first conferring With the geotechnical engineer who prepared it. And no one — not evanyou —should apply the report for any purpose or project except the one originally contemplated. Read the Full Report Serious problems have occurred because those relying on a geolechnical engineering report did not read it all. Do not rely on an executive summary. Do not read selected elements only. A Geolechnical Engineering Report Is Based on A Unique Set of Ppoject-Specific Factors Geolechnical engineers consider a number of unique, project -specific fac- tors when establishing the scope of a study. Typical factors include: the client's goals, objectives, and risk management preferences; the general nature of the structure involved, its size, and configuration-, the location of the structure on the site, and other planned or existing site Improvements, such as access roads, parking lots, and underground utilities. Unless the geolechnical engineer who conducted the study specifically Indicates oth- erwise, do not fely on a geolechnical engineering report that was: * not prepared for you, not prepared for your project, not prepared for the specific site explored, or completed before important project changes were made. Typical changes that can erode the reliability of an existing geotechnical engineering report include those that affect: the function of the proposed structure, as when it's changed from a parking garage to an office building, or from a light Industrial plant to a refrigerated warehouse, elevation, configuration, location, orientation, or weight of the proposed structure, composition of the design team, or project ownership. As a general rule, always inform your geotechnical engineer of project changes --even minor ones —and request an assessment of their impact. Geolechnical engineers cannot accept responsibility or liability for problems that occur bemuse their reports do not consider developments of which They tyefe not informed. Subsurface Conditions Can Chanue A geotechnical engineering report is based on conditions that existed at the time the study was performed. Do not rely on a gootechnical engineer- ing report whose adequacy may have been affected by: the passage of time; by man-made. events, such as construction on or adjacent to the site; or by natural events, such as floods, earthquak6s, or groundwater fluctua- tions. Always contact the geotechnical engineer before applying the report to determine if It is still reliable. A minor amount of additional testing or analysis could prevent major problems. Most Geotechnical Fludinus Ape Professional Opinions Site exploration identifies subsurface conditions only at those points where subsurface tests are conducted or samples are taken. Geotechnical engi- neers review field and laboratory data and then apply their professional judgment to render an opinion about subsurface conditions throughout the site. Actual subsurface conditions may differ —sometimes significantly — from those indicated in your report. Retaining the geotechnical engineer who developed your report to provide construction observation is the most effective method of managing the risks associated with unanticipated conditions. . A Report's Recommendations Are Not Flual Do not overrely on the construction recommendations included in your report. Those recommendations are not final, because geotechnical engi- neers develop them principally from judgment and opinion. Geolechnical engineers can finalize their recommendations only by observing actual H_Z6 subsurface conditions revealed during construction. The geolechnical engineer who developedyour report cannot assume responsibifily or liabifily for the report� recommendations if that engineer does not perform construction observation. A Geotechnical Engineeping Repopt Is Subject to Misintepppetation Other design Learn members' misinterpretation of geolechnicall engineering reports has resulted in costly problems. Lower that risk by having your geo- technical engineer confer with appropriate members of the design team after submitting the report. Also retain your geolechnical engineer to review pedi- nent elements of the design team's plans and specifications, Contractors can also misinterpret a geolechnical engineering report. Reduce that risk by having your geotechnical engineer participate in prebid and preconstfuclion conferences, and by providing construction observation. Do Not Redpaw the Enuinews Lous Geolechnical engineers prepare final boring and testing logs based upon their interpreta lion of field logs and laboratory data. To prevent errors or omissions, the logs included in a geotechnical engineering report should neverbe redrawn for inclusion In architectural or other design drawings. Only photographic or electronic reproduction Is acceptable, but recognize that separating logs from the repoll can elevate risk Give Contpactops a Complete Repopt and Guidance Some owners and design professionals mistakenly believe they can make contractors liable for unanticipated subsurface conditions by limiting what [hey provide for bid preparation. To help prevent costly problerns, give con- tractors the complete geolechnical engineering report, but preface it With a clearly written letter of transmittal. In that letter, advise contractors that the report was not prepared for purposes of bid development and that the report's accuracy is limited; encourage them to confer With the geolechnical engineer who prepared the report (a modest fee may be required) andlor to conduct additional study to obtain the specific Wes of information they need or prefer. A prebld conference can also be valuable. Be sure conhac- lots haVe suff1dent time to perform additional study. Only then might you be in a position to give contractors the best information available to you, while requiring them to at least share some of lhe firrdncial responsibilities stemming from unanticipated conditions. Read Responsibility Ppovislons Closely Some clients, design professionals, and contractors do not recognize that geolechnical engineering is far less exact than other engineering disci- plines. This lack of understanding has- created unrealistic expectations that have led to disappointments. claims, and disputes. To help reduce the risk of such outcomes, geotechnical engineers commonly include a variety of explanatory provisions in their reports. Sometimes labeled "limitations" many of these provisions indicate Where geotechnical engineeis'iesponsi- bilities begin and end, to help others recognize their own responsibilities and risks. llead these provisions closely. Ask questions. Your geolechnical engineer should respond fully and frankly. Geoenviponmental Concepns Ape Not Coveped The equipment, techniques, and personnel used to perform a geoenviron- mentaistudy differ significantly from those used to perform a goolechnical study. For that reason, a geolechnical engineering report does not usually relate any gecenvironmental findings, conclusions, or recommendations; e.g., about the likelihood of encountering underground storage tanks or regulated contaminants. Unanticipated environmental problems have led to numerous project failures. If you have not yet obtained your own geoen- viionmental information, ask your geolechnical consultant for risk man- agement guidance. Do not rely on an environmental reportprepared for someone else. Obtain Ppofessional Assistance To Deal with Mold Diverse strategies can be applied during building design, construction, operation, and maintenance to prevent significant amounts of mold from growing on indoor surfaces. To be effective, all such strategies should be devised for the express purpose of mold prevention, integrated into a com- prehensive plan, and executed with diligent oversight by a professional ff iold prevention consultant. Because just a small amount of water or moisture can lead to the development of severe mold infestations, a num- bef of mold prevention strategies focus on keeping building surfaces dry. While groundwater, Water Infiltration, and similar Issues may have been addressed as part of the geolechnical engineering study whose findings are conveyed in this report, the geolechnical engineer in charge of this project is not a mold prevention consultant; none of Me services per- formed in connection with the geatechnical engineer's study were designed or conducted for the purpose of moldpreven- lion. Proper implementation of the recommendations conveyed in this report will not of itself be sufficient to prevent mold front growing in or on the structure involved. Rely, on Youp ASFE-Membep Geotechnclal Engineep top Additional Assistance Membership in ASFE/The Best People on Earth exposes geotechnical engineers to a wide array of risk management techniques that can be of genuine benefit for everyone Involved with a construction project. Confer with you ASFE-member gootechnical engineer for more information. ASFE The Best People an Eallh 8811 Colasvllle Road/Sulte G106, Silver Spring, MD 20910 Telephone: 301/565-2733 Facsimile: 301/589-2017 e-mail: info@aste.Drg www.asle.ofg 17npydght2004hyASF& Ina DuplIcaffoi% reproduction, arcopyIng of this document, In whole or In part, by any means whalsoever Is sidattyprohlbited. empt withASFft specilic written permission. Excerpling, quoUng, or otherwise extracting wording from this document Is permitted only with the &%press written permission olASFE. and only for pulposes of scholady research or book retlaw. Only members ofASFE may use this document as a complement to or as an element of a geolechrdcal engineering report, Any other firm. IndkIdual. or other enli(y that so uses this document R41hout being an AW member could be commifflng negligent or Intentional (fraudulent) misrepresentation. 11GER06045.0M #-Z.7 OPERATION AND MAINTENANCE GUIDELINES: Operation and Maintenance Requirements: These guidelines are intended to provide operation and maintenance instructions for the O'Reilly Auto Parts (23005 Highway 99) storm drainage control facilities. The owner is responsible for maintenance of storm drainage facilities within the property. The owner is not responsible for maintenance within the public right-of-way. This manual is not comprehensive. Although it explains the intended operation of the various components of the drainage system, and suggests a routine of inspection and maintenance, it cannot anticipate every problern. Once a historical record of maintenance is established, it may be prudent to alter the routine. It is recommended that maintenance records be kept, and that the records be reviewed periodically. Concept of Operation: The drainage design is shown and described in the final site development engineering plans and report. The approved site development plans and report should be retained by the owner and used as a reference to identify drainage facilities outlined in this manual. Conveyance Systems. The design objective in pipe sizing was to convey the large storm events without the water surface exceeding the ground elevation. Frequent overtopping of the pipe system in a particular area might indicate a downstream blockage. Overtopping of the drain systerns at the catch -basins is an indication that maintenance is required. Stormwater Storage Detention Tank System. The onsite detention system consists of an underground detention tank under north of the proposed building. Onsite storm water runoff is routed to the detention tank and discharged to 230"' St SW. The detention tank is a typical component of a storm water control system for new development. Standard maintenance procedures should be followed. Slormwater Filter System- FloGard Perk Filter System. The site contains a filter system that provides water quality treatment and phosphorus removal. -A complete maintenance manual provided by the manufacture is attached. Initial inspections of the filter system should occur every 6 months. Once a historical basis is developed the frequency of inspection may be modified as necessary as outlined in the manufacture's attached maintenance manual. For additional and updated maintenance information visit the Washington State Department of Ecology's web -site at: http://www.ecy.wa.gov/programs/wq/wqhome.htmi Lovell-Saueriand and Associates O'Reilly Auto Parts Final Engineering and Drainage Report 23005 Highway 99 LSA No. 5331 September 2011 No. 3 — Closed Detention Systems (Tanks/Vaults) Maintenance Defect Conditions When Maintenance is Needed Results Expected Component When Maintenance is Performed Storage Area Plugged Air Vents One-half of the cross section of a vent is Vents open and blocked at any point or the vent is damaged. functioning. Debris and Sediment Accumulated sediment depth exceeds 10% All sediment and of the diameter of the storage area for 1/2 debris removed from length of storage vault or any point depth storage area. exceeds 15% of diameter. (Example: 72-inch storage tank would require cleaning when sediment reaches depth of 7 inches for more than 1/2 length of tank.) Joints Between Any openings or voids allowing material to All joint between Tank/Pipe Section be transported into facility. tank/pipe sections are sealed. (Will require engineering analysis to determine structural stability). Tank Pipe Bent Out Any part of tank/pipe is bent out of shape Tank/pipe repaired or of Shape more than 10% of its design shape. (Review replaced to design. required by engineer to determine structural stability). Vault Structure Cracks wider than 1/2-inch and any Vault replaced or Includes Cracks in evidence of soil particles entering the repaired to design Wall, Bottom, structure through the cracks, or specifications and is Damage to Frame maintenance/inspection personnel structurally sound. and/or Top Slab determines that the vault is not structurally sound. . Cracks wider than 1/2-inch at the joint of any No cracks more than inlet/outlet pipe or any evidence of soil 1/4-inch wide at the particles entering the vault through the walls. joint of the inlet/outlet pipe. Manhole Cover Not in Place Cover is missing or only partially in place. Manhole is closed. Any open manhole requires maintenance. Locking Mechanism Mechanism cannot be opened by one Mechanism opens Not Working maintenance person with proper tools. Bolts with proper tools. into frame have less than 1/2 inch of thread (may not apply to self-locking lids). Cover Difficult to One maintenance person cannot remove lid Cover ran be Remove after applying normal lifting pressure. Intent removed and is to keep cover from sealing off access to reinstalled by one maintenance. maintenance person. Ladder Rungs Unsafe Ladder is unsafe due to missing rungs, Ladder meets design misalignment, not securely attached to standards. Allows structure wall, rust, or cracks. maintenance person safe access. Catch Basins See'Catch Basins" See "Catch Basins" (No. 5). See "Catch Basins" (No. 5) (No. 5). 4-34 Volume V —Runoff Treatment BMPs February 2005 .r- 0- No. 4 — Control Structure/Flow Restrictor Maintenance Defect Condition When Maintenance is Needed Results Expected Component When Maintenance is Performed General Trash and Debris Material exceeds 25% of sump depth or 1 Control structure (Includes Sediment) foot below orifice plate. orifice is not blocked. All trash and debris removed. Structural Damage Structure is not securely attached to Structure securely manhole wall. attached to wall and outlet pipe. Structure is not in upright position (allow up Structure in correct to 10% from plumb). position. Connections to outlet pipe are not watertight Connections to outlet and show signs of rust. pipe are water tight; structure repaired or replaced and works as designed. Any holes --other than designed hofes--in the Structure has no structure. holes other than designed holes. Cleanout Gate Damaged or Missing Cleanout gate is not watertight or is missing. Gate is watertight and works as designed. Gate cannot be moved up and down by one Gate moves up and maintenance person. down easily and is watertight. Chain/rod leading to gate is missing or Chain is in place and damaged. works as designed. Gate is rusted over 50% of its surface area. Gate is repaired or replaced to meet design standards. Orifice Plate Damaged or Missing Control device is not working properly due to Plate is in place and missing, out of place, or bent orifice plate. works as designed. Obstructions Any trash, debris, sediment, or vegetation Plate is free of all blocking the plate. obstructions and works as designed. Overflow Pipe Obstructions Any trash or debris blocking (or having the Pipe is free of all potential of blocking) the overflow pipe. obstructions and works as designed. Manhole See "Closed See "Closed Detention Systems" (No. 3). See "Closed Detention Systems" (No. 3). Detention Systems" (No. 3). Catch Basin See "Catch Basins" See "Catch Basins" (No. 5). See "Catch Basins." I (No. 5). 1 (No. 5). February 2005 Volume V —Runoff Treatment BMPs 4-35 2--3 No. 5 - Catch Basins Maintenance Defect Conditions When Maintenance is Needed Results Expected When Component Maintenance is performed General Trash & Trash or debris which is located immediately No Trash or debris located Debris in front of the catch basin opening or is immediately in front of blocking inletting capacity of the basin by catch basin or on grate more than 10%. opening. Trash or debris (in the basin) that exceeds 60 No trash or debris in the percent of the sump depth as measured from catch basin. the bottom of basin to invert of the lowest pipe into or out of the basin, but in no case less than a minimum of six inches clearance from the debris surface to the invert of the lowest pipe. Trash or debris in any inlet or outlet pipe Inlet and outlet pipes free blocking more than 1/3 of its height. of trash or debris. Dead animals or vegetation that could No dead animals or generate odors that could cause complaints vegetation present within or dangerous gases (e.g., methane). the catch basin. Sediment Sediment (in the basin) that exceeds 60 No sediment in the catch percent of the sump depth as measured from basin the bottom of basin to invert of the lowest pipe into or out of the basin, but in no case less than a minimum of 6 inches clearance from the sediment surface to the invert of the lowest pipe. Structure Top slab has holes larger than 2 square Top slab is free of holes Damage to inches or cracks wider than 1/4 inch and cracks. Frame and/or Top Slab (Intent is to make sure no material is running into basin). Frame not sitting flush on top slab, i.e., Frame is sitting flush on separation of more than 3/4 inch of the frame the riser rings or top slab from the top slab. Frame not securely and firmly attached. attached Fractures or Maintenance person judges that structure is Basin replaced or repaired Cracksin unsound. to design standards. Basin Walls/ Bottom Grout fillet has separated or cracked wider Pipe is regrouted and than 1/2 inch and longer than 1 foot at the secure at basin wall. joint of any inlet/outlet pipe or any evidence of soil particles entering catch basin through cracks. Settlement/ If failure of basin has created a safety, Basin replaced or repaired Misalignment function, or design problem. to design standards. Vegetation Vegetation growing across and blocking more No vegetation blocking than 10% of the basin opening. opening to basin. Vegetation growing in inlet/outlet pipe joints No vegetation or root that is more than six inches tall and less than growth present. six inches apart. 4-36 Volume V —Runoff Treatment BMPs February 2005 X- &/ No. 5 — Catch Basins Maintenance Defect Conditions When Maintenance is Needed Results Expected When Component Maintenance is performed Contamination See "Detention Ponds" (No. 1). No pollution present. and Pollution Catch Basin Cover Not in Cover is missing or only partially in place. Catch basin cover is Cover Place Any open catch basin requires maintenance. closed Locking Mechanism cannot be opened by one Mechanism opens with Mechanism maintenance person with proper tools. Bolts proper tools. Not Working into frame have less than 1/2 inch of thread. Cover Difficult One maintenance person cannot remove lid Cover can be removed by to Remove after applying normal lifting pressure. one maintenance person. (intent is keep cover from sealing off access to maintenance.) Ladder Ladder Rungs Ladder is unsafe due to missing rungs, not Ladder meets design Unsafe securely attached to basin wall, standards and allows misalignment, rust, cracks, or sharp edges. maintenance person safe access. Metal Grates Grate opening Grate with opening wider than 7/8 inch. Grate opening meets (If Applicable) Unsafe design standards. Trash and Trash and debris that is blocking more than Grate free of trash and Debris 20% of grate surface inletting capacity. debris. Damaged or Grate missing or broken member(s) of the Grate is in place and Missing. grate. meets design standards. No. 6 — Debris Barriers (e.g., Trash Racks) in a ,MA.� "tin' ride Defect Condition When-Maihti6a.n6e'js. Results Expected When �!Coqijponents� Needed Maintenance is Performed General Trash and Trash or debris that is plugging more Barrier cleared to design flow Debris than 20% of the openings in the barrier. capacity. Metal Damaged/ Bars are bent out of shape more than 3 Bars in place with no bends more Missing inches. than 3/4 inch. Bars. Bars are missing or entire barrier Bars in place according to design. missing. Bars are loose and rust is causing 50% Barrier replaced or repaired to deterioration to any part of barrier. design standards. Inlet/Outlet Debris barrier missing or not attached to Barrier firmly attached to pipe Pipe pipe February 2005 Volume V —Runoff Treatment BMPs 4-37 z-5 M-11 FloGard@ Perk Filter Systems Operations and Maintenance Manual Version WA DOE June 1, 2010 CA Z--(* 2 1 P a g e FloGardO Perk Filter System 0 & M Manual FloGard@ Perk Filter Systems- Radial Media Filtration Description / Basic Function The Perk Filter is a stormwater filtration device used to reduce pollutant loading in runoff from urban developments. Impervious surfaces and other urban and suburban landscapes generate a variety of contaminants that can enter stormwater, polluting downstream receiving waters. The Perk Filter captures and retains sediment, oils, metals and other target constituents close to the source and reduces the total discharge load. The Perk Filter cartridge is manufactured from durable polymeric components with a polymer-coateO steel support screen and stainless steel hardware. Its base construction allows use with a wide variety of media chosen to address site -specific pollutants of concern. Perk Filters may be installed as a retrofit to suitable existing curb inlet, drop inlet, or combination catch basins, as an integral part of a coated steel- or concrete -housed stormwater inlet system for commercial, residential, and industrial developments, or as centralized modular treatment system installed either on- line or off-line. Prefiltration Systems constructed with a catch basin inlet are equipped with a FloGard@Plus Catch Basin Insert for pre -filtration. This insert captures gross pollutants such as trash, debris, hydrocarbons, and large sediment particles. Gravity Separation Some Perk Filter systems have an inlet bay wherein the initial stormwater flows are received. This is separated from the main treatment chamber by a baffle wall with weir assembly. Medium size sediment particles are retained in the inlet bay. A drain down assembly to eliminate standing water from the inlet bay area between storm events is included in standard configurations. Media Filtration Once the stormwater enters the treatment chamber, it will pass through the filtration cartridges containing the project -specified filter media as the water level rises in the chamber. Very fine pollutant particulates will be retained in the filter cartridges as the water flows through the media to an interior perforated pipe, dropping the treated stormwater into an outlet chamber below a false floor. Peak Flow Bypass Perk Filter systems are designed with a peak flow bypass to ensure the system will not back up and cause upstream flooding during extraordinary storm events. The bypass weir is an integral part of the baffle wall assembly in the inlet bay and allows peak flow stormwater directly to the outlet chamber. KriStar Enterprises, Inc. 360 Sutton Place Santa Rosa, CA 95407 (800) 579-8819 www.kristar.com -T-7 3 1 P a g e - FloGard" Perk Filter System 0 & M Manual Maintenance Overview for FloGard@ Perk Filter Systems State and Local regulations require that stormwater management systems be maintained and serviced on a recurring basis. The purpose of maintaining a clean and obstruction free Perk Filter system is to ensure the system performs the intended function of the pri mary design. Trash and debris, floatables, gross pollutants and sediment can build up in any stormwater system. This can cause the system to function improperly by impeding flow in and out of the system and reducing the operating efficiency of the media filters. Downstream and upstream, areas could run the risk of flooding and deleterious environmental impact. Recommended Frequency of Service It is recommended that FloGard(O Perk Filter systems be serviced on a regularly occurring basis. Ultimately the frequency depends on the amount of runoff, pollutant loading, and interference from trash, debris and gross pollutants as well as proper maintenance of upstream pretreatment devices. However, it is recommended that each installation be inspected in accordance with the following guidelines: Level I Inspection Service — Six (6) months after unit is placed into service, or six (6) months after a Level 2 or Level 3 inspection. Level 2 Inspection Service- Four (4) months after a Level 1 inspection or ten (10) months after a Level 3 service. Level 3 Service — As determined by findings from Level 2 inspection service reports indicating a media filter change or system repairs are required to maintain the operating efficiency of the system. Service Procedures Inlet Bay 1. The inlet manhole cover(s) and or grate(s) shall be removed and placed to one side. 2. For systems with a FloGard Plus Catch Basin Insert, the insert will be cleaned in accordance with the general specifications for maintenance of those devices. After cleaning the filter shall be removed and set aside. 3. Any debris will be removed from the inlet bay(s) and disposed of in accordance with local regulations. 4. Check and clean the area behind and under the inlet weir/bypass assembly. Remove assembly as necessary to conduct inspection. 5. Check drain down assembly and clean if necessary. 6. Re -install catch basin insert filter. 7. Re -install grate or manhole access cover. Cartridge Bay 1. Remove and place to one side the manhole access covers above the cartridge bay. 2. A Level 1 inspection service shall consist of a visual inspection from the surface level. Observe and note the condition of the cartridge bay and the cartridges, measure sediment level, if any, and note on maintenance record. Physical entry is not required unless the depth prevents the entire cartridge bay area from being observed. KriStar Enterprises, Inc. 360 Sutton Place Santa Rosa, CA 95407 (800) 579-8819 www.kristar.com X- 8 4 1 P a g e - FloGard' Perk Filter System 0 & M Manual 3. A Level 2 inspection service shall consist of a physical, confined -space entry into the cartridge bay. The filter cartridges and filter media shall be inspected for condition and filter media life, the sediment level, if any, measured, and any trash or debris removed and disposed of in accordance with local regulations. All information and recommendations shall be noted on the maintenance record. 4. A Level 3 service shall consist of a physical, confined -space entry into the cartridge bay. The filter cartridges shall be removed and replaced with re -charged exchange filter cartridges. As an option, the filter media may be removed of on -site, the cartridges cleaned, and replacement media be installed into the cartridges. All spent filter media shall be disposed of in accordance with local regulations. 5. Upon completion of inspection/service, re -install the manhole access cover(s). 6. The manhole cover(s) and/or grate(s) shall be replaced. Inspection / Maintenance Requirements Listed below are some recommendations for equipment and training for personnel to inspect and maintain a FloGard@ Perk Filter system. Personnel — OSHA Confined Space Entry Training is a prerequisite for entrance into a system. In the state of California personnel should be CalOSHA certified. Equipment — Record Taking (pen, paper, voice recorder) Proper Clothing (appropriate footwear, gloves, hardhat, safety glasses, etc.) Flashlight Tape Measure Measuring Stick Pry Bar Traffic Control (Flagging, barricades, signage, cones, etc.) First aid materials Debris and Contaminant collectors Debris and Contaminant containers Vacuum Truck Disposal of Gross Pollutants, Hydrocarbons, Sediment, and Filter Media The collected gross pollutants, hydrocarbons, sediment, and filter media shall be disposed of in accordance with local, state and/or federal agency requirements. KriStar Enterprises, Inc. 360 Sutton Place Santa Rosa, CA 95407 (800) 579-8819 www.kristar.com 7-- c? DATE RECEIVED44, [PERMIT EX PIRES Cghs.&_ CITY OF EDMONDS PERMIT ZONE." NUMBE5a��416 CONSTRUCTION PERMIT APPLICATION J0 SUITVAPT# ADDRESS JY)OL5- A� q9 IA OWNER NAVE #4AME OF BUSINE S PLAT NAME/SUBDIVISIQN NO. LOT NO.a LID NO. LID FEE $ MAILING ADDRESS I - e2j&TESCIP VT PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP EXISTING PROPOSED REQUIRED DEDICATION— Fr AP rZ� RW PermRPR Ired Stroat Use Pamit PAO Inspecdon Required 13 Sidewalk Required 13 Undamround Wiring required 11 CITY ZIP TELEPHONE NAME METER SIZE LINE SIZE NO. OF FIXTURES PRV REQUIRED YES13 NO 13 x ADDRESS REMARKS OWNER/CONTRACTOR RESPONSIBLE FOR EROSION CONTROLIDRAINAGE CITY ZIP TELEPHONE 'I T- cc 0 8 0 NAUE Cal. ENGIN EERING REVIEWED BY ADDRESS FIRE REVIEWED By DATE Lu ML CITY ZIP TELEPHONE zz 7 V� NARIANCE OR,Cut"��,]­ OREL114E OR ADB# I.:' ewk i INSPE7111 �.D D �R m ols BOND POSTED TI tli, DATE V-CH STATE LICENSE NUMBER EXPI�A 0 ;CH � 6 A I/ "4c: C/*,O .. I , . I .* ­ , SEPA REVIEW,',�,�r_ 'COMPLETE �,E EXP� ED )1060 0 WIV T­ LLOW PROPOSED -C.*HEIGHT ALLOWED PROPOSED I PROPERTY TAX ACCOUNT, PARC EL NO. V� .0'. — V_R PLUMBING MECH NEW SIDENTIAL CC COMPLIANCE OR El ADDITION COMMERCIAL CHANGE OF USE., , 0_*SIGN �eREMODEL MULTIFAMILY LOT COVERKGE2. 'ALLOWED' Okbpds`ED7� :REQUIRED �SETBACKS (Fr.,)-_ 'FRONT SIDE :�:.AEAR �PROPOSED SETBACKS (Fr.) FRONT URSIDE REAR PARKING REOD I PROVID AREA% P NNING;R EVIEWED.8 Y DATE —7 j GRADING FENCE REPAIR CYDS X FT) REMARKS OT ER DEMOLISH TANK H z E3 GARAGE RETAINING WALL EyF RE,SPRINKLER: CARPORT EL ROCKERY, FIREALARM� (rYPE OF USE, BUSIN;Mj WIV .7jP71N: CHECKED BY TYPE, CO RU OCCUPANT GROUP NUMBER OF STORIES—,--*, NUMBER OF DWELLING'�.�,* UNITS CRITICAL AREAS NUMBER 01 0 0 SPECIAL INSPECTION REQUIRED [3 YE P JAREA OCCUPANT LOAD DESCRIBE WORK TO BE DONE'. REMARKS C jL PROGRESS'INSPECTIONS-PERIUR 08/FINAL INSPECTION REO'D 03 ?e- ":a ­7 ))ALUATIOW, FEE Description Description FEE /,^v �Plan,Chebk State Surcharge HEAT SOURCE GLAZING % -,LOT)SLOPE % Building-Perm'lj — City Surcharge PLAN CHECK NO;,V.,�� VESTED DATE -Plurribilig-) Mechanical THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO I= BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES., ETC.) WILL REQUIRE Grading SEPARATE PERMISSION. Engr. Review PERMIT APPLICATION: 180 DAYS PERMIT LIMIT: I YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS SEE BACK OF PINK PERMIT FOR MORE INFORMATION Engr. Inspection 'APPLICANT ON BEHALF OF HIS OR HER SPOUSE, HEIRS. ASSIGNS AND SUCCESORS Fire Review Plan Chk. Deposit IN INTEREST, AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF 2 EDMONDS, WASHINGTON, ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY Fire Inspection IAND Receipt # ALL CLAIMS FOR DAMAGES OF WHATEVER MATURE, ARISING DIRECTLY OR INDIRECTLY FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE 9 DEEMED TO MODIFX WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE Landscapelnsp. Total Amt. Due 0 NOR LIMIT IN ANY WAY THE CITYS ABILITY TO ENFORCE ANY ORDINANCE PROVISION., Recording Fee Receipt # I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION GIVEN IS CORRECT, AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF APPLICATION API IROVAL THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC- This application Is not a permit until signed by the TION; AND IN DOING THE WORK LITHORIZED THEREBY. NO PERSON WILL BE EMPLOYED CALL /1119 Official orhiather Deputy: and Fees are paid, and IN VIOLATION OF THE LABOR DE OF THE STATE OF WASHINGTON RELATING TO FOR INSPECTION receipt Is fpknowledged in space provided. WORKMEN'S COMPENSA3" RANCE AND RCW 18.27. kPIZICiALS SIGNj4RE DATE §W.NAUqE (OWNER A D!AUE YGINED %. 5 31/6 771-0220 R BED ­-4TTE4TION M 1333 IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- ORIGINAL-FILE YELLOW -INSPECTOR CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 PINK -OWNER GOLD -ASSESSOR 04/02 PRESS HARD -YOU ARE MAKING 5 COPIES GREEN - ACCOUNTING CITY OF FDXVICA�10's BUILDING DE�ZTPVIENT OZ - WORK ADDRES-� OWNER APPROVED DATE: BLDG. OFFICIAL. CZ— C ��7-: 7: co co C= J= C C* 'big W 3C C hams I L1 IMca on co M< M� 10 CO3 CD .4 Ca I Co U) .4 U3 Mn Mn 0 CIO tjQ fu 0. 91 M M M 2 FU 0 ZE C= --i C5 M This drawing was specifically created for: Tuff Shed 0 Proofs are property of Russell Sign Company and may not be reproduced in anyway RUF�MLL without consent from Russell Sign Company. All proofs are for representation only. SIGN a" 5629 208th St. SW Ste. H Lynnwood, WA 98036. 425.775.7010 Fax 425.673.5508 Ploneor National Title Inturance Com WASHINGTON TITLE DIVISION i'iled for Record at Request of 84042,60148 Y" ro Cp rz. r-4 11115 SPACk RESERVED FOR kfCopl)(R � USE., r C) p, n E D4�3� A P IR I G AM 13 1 0 F.!A Ii V. L 1�� t � - J - � T Y; �,;.i,A. Q.!:. DEPU'l .. ..... Quit Claim Deed -CITY CLERK Civic center Edmonds, -washinZton & � t &) bA�l �_ � K_,� Von" Los a THEGRANTOR WILCE SHIOMI, MITSUKO SHIOMI and SANDRA L. CHINN, as their interests appear of record for and in consideration of One dollar , f or road purposes convey and quit claim to City of Edmonds the following described real estate, situated In the County of Snohomish State of Washington including any interest therein which grantor may hereafter acquire: The Northerly 10 feet of the following tract of land: All that portion of Tract 15, plat of Skelton's Lake McAleer 5 Acre Tracts, per the plat as recorded in Volume 6 of Plats, page 21, records of Snohomish County, Washington, described as follows: Beginning at the intersection of the North line thereof and the Easterly margin of the Old U.S. 99 Highway; thence along the North line thereof, N89'37'.38"E, a distance of 205.0 feet; thence SO*43'37"E parallel with the East line thereof, a distance of 279.0 feet; thence parallel with the North line, S89037'38"W, a distance of 218.18 feet to an intersection with a line that is perpendicular to the said Easterly margin of Old U.S. 99; thence N64'16'W, a distance of 15.72 feet to a point of intersection with the West line of said Tract 15;' thence along said West line, NO'44'38"W, a distance of 218.01 feet to a point of intersection with the Easterly margin of Old U.S. 99; thence along said Easterly margin, N25'44'E, a distance of 61.3 feet to the Point of Beginning. together with the right to make all necessary cut or fill slope s on the land of grantor'.s adjacent to the above -described real property in connection with the construction, maintenance or improvement of .the above -described real property for Purposes of apubli roadway. Dated this ;2 0 day of ti r (SEAL)* ..... R=�nd and WifW . . .. . ........... STATE OF W.ASHINGTON, County of King SS. 49hinn On this day personally appeared before meWilce Shiomi, Mitsuko Shiomi and Sanc�ra L./ to ml �,nqwn to be the individuals described In and who executed the within and foregoing instrument, and ,,AeU(MledgoA,�at they signed the same a3 their free and voluntary act and deed, for the �.ubq-ana p�qrponktherein mentioned. `dIUN.underru band and official seal this 20th of Plarch, 1984 'Y —FAX "AL . ............. tzcn t� "I' a wasisix:1OX, Wo Puhu"­il 84 o4 4.# ­ . "'A ............ APRI G 193 -0 4 n! VOL J838PAGE2072 +Y 4b ,ON '%7 OLARTC MAC-F-�,WrM cb1XWP) F"W& bALK -rT W. or-jDRZ6C&4T wATT 6Amft) COL011, W94UNDY LV. TIE" & b0QZllA OFP *"TL bNLAb40LNP 4 "llb Wy. pRoposm ME 4b-A4AW* WON em-T. Tw� WIND 0 I- HI 99 OFFICE APJA r-f�, CrY?.) VAJUECZ L.�l OCAU.NPJ6 LT,f P. e -.TRUT bel woo SECTION THRU PROPERtY a HWY 99 'SCALE 1 30'- 0" &*ag "Tt %MLO TO Cal. - L16 L-�� 'Ve Lid SIGN ELEVATION SCALE: 1/2', 1'-0" SIDE VIEW 4 - W Cv. 1. i!j It, 0* RA F. cow - LAVEL111 0 b6AA (.�01 61N W.Low WT IN OK,&JX CTYr.) A14, 11W 1: v COLUMN BASE DE' IL SCAL.E:30-I'-O' PAUL Z. WU rywnbw - offor"n fttnut* of a 12M 1 $23 - 4873 8109,N.E.113th. Kirkland VO 98033 0 k6.q 11 4. DEVIATIONS FROM THESE PLANS MUST BE APPROVED BY THE ENGINEER OF RECORD AND THE LOCAL GOVERNING AUTHORITY. ARCHITECT 5. CONTRACTOR SHALL RECORD ALL APPROVED DEVIATIONS FROM THESE PLANS ON A SET OF "AS -BUILT" DRAWINGS AND SHALL SUMMARIZE ALL AS -BUILT opli, CONDITIONS ON ONE SET OF REPRODUCIBLE DRAWINGS FOR SUBMITTAL TO THE OWNER PRIOR PROJECT COMPLETION AND ACCEPTANCE. A SET OF WA AS -BUILT DRAWINGS SHALL BE SUBMITTED TO THE CITY OF EDMONDS PRIOR TO FINAL APPROVAL OF THE BUILDING OCCUPANCY/FINAL PROJECT 'Cal APPROVAL. 6. ELEVATIONS SHOWN ARE IN FEET. SEE SURVEY FOR BENCHMARK INFORMATION. .. ........ .. . . .. .. ....... 7. THE LOCATIONS OF EXISTING UTILITIES. AND SITE FEATURES SHOWN HEREON HAVE BEEN FURNISHED BY OTHERS BY FIELD SURVEY OR OBTAINED FROM . . .......... ........... . ........ RECORDS AND SHOULD THEREFORE BE CONSIDERED APPROXIMATE ONLY AND NOT NECESSARILY COMPLETE. IT IS THE SOLE REASONABILITY . ... .. ..... OF THE CONTRACTOR TO INDEPENDENTLY VERIFY THE ACCURACY OF ALL UTILITY LOCATIONS SHOWN AND TO FURTHER DISCOVER AND PROTECT ANY 228th ST S.W. ... .................. . . > T HOWN HEREON WHICH MAY BE AFFECTED BY THE IMPLEMENTATION OF THIS ........... ...... . .. ..................... ....... .. ..................... I . . . .. .................... . . ....................... . BRUCE M. SITE PLAN. CONTRACTOR SHALL VERIFY LOCATION, DEPTH, SIZE, TYPE AND CONDITION OF EXISTING UTILITY LINES AT CONNECTION OR CROSSING POINTS 230th ST S.W. m CARLSON BEFORE TRENCHING FOR NEW UTILITIES. ENGINEER ASSUMES NO RESPONSIBILITY FOR THE COMPLETENESS OR ACCURACY OF THE architecture - planning - interior design ON THESE DRAWINGS. ENGINEER SHALL BE 99 8. CONTRACTOR SHALL LOCATE AND PROTECT ALL UTILITIES DURING M. CHRISTOPHER ROGERS, P.E. CONSTRUCTION AND SHALL CONTACT THE UNDERGROUND UTILITILS LOCATION BRUCE M. CARLSON ARCHITECT SERVICE (1-800-424-5555) AT LEAST 48 HOURS PRIOR TO CONSTRUCTION. 219 NORTH SECOND STREET SUITE 301 9. CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AT THE P�­, DJECT SITE BEFORE STARTING WORK AND SHALL NOTIFY OWNER'S 9-1-11 MINNEAPOLIS, MN 55401-1454 236th ST S.W. REPRESENTATIVE OF ANY DISCREPANCIES. DATE ISSUff .............. . . . ..... . . . .. . ................... Phone: (612) 338-6677 38600 Fax: (612) 338-2995 10. PIPE LENGTHS WHERE SHOWN ARE APPROXIMATE AND MAY CHANGE DUE TO FIELD CONDITIONS. REG. NO. EMAIL: jiverson@cmarch.com > z 11. CONTRACTOR SHALL OBTAIN A COPY OF THE GEOTECHNICAL REPORT (WHERE APPLICABLE) AND SHALL THOROUGHLY FAMILIARIZE HIMSELF WITH THE C Contacts: 5 CONTENTS THEREOF. ALL SITE WORK SHALL BE PERFORMED IN STRICT COMPLIANCE WITH THE RECOMMENDATIONS OF THIS REPORT. JESSICA IVERSON U) 12. STRUCTURAL FILL MATERIAL AND PLACEMENT SHALL CONFORM TO THE RECOMMENDATIONS OF THE PROJECT GEOTECHNICAL REPORT. Registration: STATE OF WASHINGTON 13. MANHOLES, CATCH BASINS, UTILITIES AND PAVEMENT SHALL BEAR ON MEDIUM DENSE TO VERY DENSE NATIVE SOIL OR COMPACTED STRUCTURAL FILL. IF SOIL IS BRUCE M. CARLSON # 5449 DISTURBED, SOFT, LOOSE,WET OR IF ORGANIC MATERIAL IS PRESENT AT SUBGRAIDE ELEVATION, REMOVE AND REPLACE WITH COMPACTED STRUCTURAL FILL PER IL GEOTECHNICAL REPORT. (J") f,,,s NOTE.D. 14. SEE SURVEY AND ARCHITECTURAL DRAWINGS FOR DIMENSIONS AND LOCATIONS OF BUILDINGS, LANDSCAPED AREAS AND OTHER PROPOSED OR EXISTING SITE 1�= VICINITY MAP FEATURES. 0 15. SEE ARCHITECTURAL DRAWINGS FOR PERIMETER FOUNDATION DRAINS. FOUNDATION DRAINS SHALL BE INDEPENDENT OF OTHER SITE DRAIN LINES AND SHALL BE TIGHTLINED TO THE STORM DRAIN SYSTEM WHERE INDICATED ON THE PLANS. CIVIL ENGINEER ri all 16. ALL REQUIRED STORMWATER FACILITIES MUST BE CONSTRUCTED AND IN OPERATION PRIOR TO INSTALLATION OF ANY PAVEMENT UNLESS OTHERWISE APPROVED BY THE ENGINEER. AP ED BY 0 S RIVI, ENGINEERING 0 17. ALL ROOF DRAINS, PERIMETER FOUNDATION DRAINS, CATCH BASINS AND OTHER EXTERNAL DRAINS SHALL BE CONNECTED TO THE STORM DRAINAGE SYSTEM. UNLESS NOTED OTHERWISE. 0) Lj ate: 0 am 0') 18. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS REQUIRED FOR a INSTALLATION OF ALL SITE IMPROVEMENTS INDICATED ON THESE DRAWINGS. 99 a� SHEET INDEX m 19. AS A MINIMUM REQUIREMENT, ALL DISTURBED AREAS ON AND OFF SITE SHALL BB RETURNED TO THE EQUIVALEN THEIR PRECONSTRUCTION CONDITION IN ANUMF& 0 A CONSTRUCTIONSEQUENCE NOTESM ACCORDANCE WITH APPROPRIATE REQUIREMENTS AND STANDARDS. Ir d, I SHEET NUMBER SHEET NAME 1. SCHEDULE A PRE-CONSTRVCITON MEETING WITH CITY ENGINEERING DIVISION AT 425-771-0220, EXT. 1326.. 20. ALL DISTURBED SOIL AREAS SHALL BE SEEDED OR STABILIZED BY OTHER ACCEPTABLE METHODS FOR THE PREVENTION OF ON -SITE EROSION AFTER THE COMPLETION OF CONSTRUCTION. SEE EROSION CONTROL PLANS FOR SPECIFIC GRADING AND EROSION CONTROL REQUIREMENTS. ....................... ............ .............................................. ........... ­­ ............................................. .................................................... Co I COVER SHEET 2. REVIEW ESC NOTES. SHEET TITLE: . .... . : 21. THE CONTRACTOR SHALL KEEP OFF -SITE STREETS CLEAN AT ALL TIMES BY SWEEPING. WASHING OF T1HESE STREETS WILL NOT BE ALLOWED WITHOUT PRIOR ............................ ... C11 SITE GRADING PLAN 3. CALL FOR UTILITY LOCATES. APPROVAL. COVER SHEET .............................................................................................................................. ............................................................................................................................... 22. THIS PROJECT IS NOT A BALANCED EARTHWORK PROJECT. BOTH EXPORT AND IMPORT OF SOIL AND ROCK MATERIALS ARE REQUIRED. C2 I SITE DEVELOPMENT PLAN 4. INSTALL ESC MEASURES AND MAINTAIN DUST CONTROL. 23. SLOPE OF FINISHED GRADE SHALL BE CONSTANT BETWEEN FINISHED CONTOURS OR SPOT ELEVATIONS SHOWN. ...................................... ............................................ ..... * ................................... ................................................. CEI ENGINEERING ASSOCIATES, INC. C3 SITE DRAINAGE PLAN ....................................... 2277 WEST HIGHWAY 36 ......................... 5. HAVE EROSION CONTROL MEASURES INSPECTED BY CITY OF EDMONDS 24. FINISHED GRADE SHALL SLOPE AWAY FROM BUILDING WALLS AT MINIMUM 5% SLOPE FOR A MINIMUM DISTANCE OF 10 FEET. SUITE 200 C4 SITE UTI LITI Y PLAN CITY ENGINEERING INSPECTOR. (ALL TEMPORARY SEDIMENTATION AND EROSION CONTROL MEASURES MUST BE ............................................................................. .............................................................................................................................................................................. IN PLACE AND INSPECTED PRIOR TO ANY CONSTRUCTION OR.SITE CLEARING. EROSION AND SEDIMENTATION ROSEVILLE, MN 55113 25. CONTRACTOR SHALL BE RESPONSIBLE FOR AND SHALL INSTALL AND MAINTAIN SHORING AND BRACING AS NECESSARY TO PROTECT WORKERS, EXISTING BUILDINGS, REVISIONS: C5 DETAILS CONTROL PRACTICES AND/OR DEVICES SHALL BE MAINTAINED Phone: (651) 697-0800 .................. ...................... ......................... .......................... ................................................................................................................................................... STREETS, WALKWAYS, UTILITIES AND OTHER EXISTING AND PROPOSED IMPROVEMENTS AND EXCAVATIONS AGAINST LOSS OF GROUND OR CAVING EMBANKMENTS. 01 UNTIL PERMANENT VEGETATION IS ESTABLISHED.) NO: DATE: BY: Fax: (651) 697-0804 CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR ................................ ..... ...................... C6 DETAILS ............ ............... . .. EMAIL: acatchpool@ceieng.com REMOVAL OF SHORING AND BRACING, AS REQUIRED. 1 2-11-11 CITY 6. ROUGH GRADE SITE AS REQUIRED TO INSTALL DRAINAGE FEATURES. ............... I ............................................ ..................................... 0 C7 DETAILS .............................................................................. ....................................................................................................................................................................... ..... 2 7-15-11 CI Contact: 26. CONTRACTOR SHALL OBTAIN APPROVAL FROM THE CITY AND FOLLOW CITY PROCEDURES FOR ALL WATER SERVICE INTERRUPTIONS, HYDRANT SHUTOFFS, STREET ........... .......... ........... ................. C8 DETAILS 7. DEMOLISH EXISTING STRUCTURES CLOSURES OR OTHER ACCESS RESTRICTIONS. CONTRACTOR SHALL NOT RELOCATE OR ELIMINATE ANY HYDRANTS WITHOUT FIRST OBTAINING WRITTEN APPROVAL ALAN CATCHPOOL ............ .......................................................... ....................................................................................................................................................... . ..................... 5 9-1-11 ............... I ............................................ ......... ........... �3)4, FROM THE FIRE MARSHAL. N C9 TRAFFIC CONTROL PLAN 8. CLEAR, GRUB & ROUGH GRADE REMAINDER OF SITE. REVEGETATE .......... ........ . .. . .......... . ..... ......... . . ­­­ .......... ........ . .. ............. .............. Re -gistration: DISTURBED AREAS NOT SUBJECT TO ADDITIONAL SURFACE DISTURBANCE '0 DI DEMOLITION PLAN 27. COORDINATE AND ARRANGE FOR ALL UTILITY CONNECTIONS, UTILITY RELOCATIONS AND/OR SERVICE INTERRUPTIONS WITH THE AFFECTED OWNERS AND T STATE OF WASHINGTON IMMEDIATELY AFTER ROUGH GRADING. (OTHER EXPOSED AREAS SHALL BE I ...... . ... n APPROPRIATE UTILITY COMPANIES. CONNECTIONS TO EXISTING UTILITIES SHALL BE MADE ONLY WITH ADVANCE WRITTEN APPROVAL OF THE AUTHORITIES GOVERNING if .5 S, M. CHRISTOPHER ROGERS, CIVIL ENGINEER 38600 STABILIZED PER EROSION CONTROL NOTES BELOW) SAID UTILITIES. ............. SEP 2- -1-1 ........... 9. INSTALL UTILITIES AND OTHER SITE IMPROVEMENTS. > 28. EXISTING UTILITY LINES IN SERVICE WHICH ARE DAMAGED DUE TO tWILDING DEF ARTTAIEW ................. .... CITY OF EMMONDS 13. STABILIZE AND REVEGETATE ENTIRE SITE. CONSTRUCTION WORK SHALL BE REPAIRED AT CONTRACTOR'S EXPENSE AND ............ INSPECTED AND ACCEPTED BY CITY OF EDMONDS AND OWNER'S REPRESENTATIVE PRIOR TO BACKFILLING. PROJECT NO: 10120.007 14. ESTABLISH LANDSCAPING AND PERMANENT VEGETATION. EROSION CONTROL FEATURES CAN BE REMOVED .. . ............ 29. NEW UTILITY LOCATIONS ARE GENERALLY SHOWN BY DIMENSION, WHERE NO DIMENSIONS ARE INDICATED, LOCATIONS MAY BE SCALED FROM DRAWINGS. FIELD ZONING: CG UPON FINAL SITE STABILIZATION AND APPROVAL BY CITY INSPECTOR. DRAWN BY: RTS ADJUSTMENTS SHALL BE APPROVED BY OWNER'S REPRESENTATIVE AND CITY. . . ....... . . . ....... AREA OF PROPERTY: (REFER TO SURVEY) C� 30. WHERE NEW PIPE CLEARS AN EXISTING OR NEW UTILITY BY 6" OR LESS, PLACE POLYETHYLENE PLASTIC FOAM AS A CUSHION BETWEEN THE UTILITIES. PARKING SUMMARY AppOwnt shall mpair/replace all (JRmaga to REQUIRED RATIO: 1 PER 300 GROSS SF uI111*3 or frontage lmpmvements� �r, 01��j C 0 3 1. SEB MECHANICAL DRAWINGS (WHERE APPLICABLE) FOR CONTINUATION OF SITE UTILITIES WITHIN THE BUILDING. REQUIRED SIZE: 9'x 18'MIN ftht-of-way por City standards thrz� gpUnd SPACES PROVIDED: 34 or amum during tho permitted prwml. 2 32. SEE ELECTRICAL DRAWINGS (WHERE APPLICABLE) FOR EXTERIOR ELECTRICAL WORK. ^TRF SHEET 1 OF 10 H.C. SPACES PROVIDED: zi, _ET FILE 33. SEE LANDSCAPE DRAWINGS (WHERE APPLICABLE) FOR SITE IRRIGATION SYSTEM. COPYRIGHT BRUCE M. CARLSON, AIA 2008 RAW CUT 688 C.Y. RAW FILL 762. CY NET RAW EARTHWORK 74 C.Y. OF FILL EXCAVATION FOR FOOTINGS 82 C.Y. OF CUT . . ........ 0�1 _lk y;t. , ". -N ru 'x V.- I'' N 0� 4.. N 1 .... ....... 4:6 11?.� .. . ...... ..... ..... ... .... 1-00 1 00 in LLJ 110 cr) Cl 0 o I 0 )o �) . ...... _v TC = 397.69:'' "., " :4 "1 PVT = 397.1% ..,"TC :�_397AO PVT 396.90 . ..... .... TC = PVT = 397. iN Tc 399. PVT 398. BY. TC = 399.22 -(PWT = 398.72 ! N TC 398.1 VT 397.6 VT 3( P �VT 398. ........... .... i T 'TC 397.85 7 PVT 397.35 cl WAN I PTf_-**M �SL�4 G�E-, WDM REFER TO SURVEY FOR EXISTING CONDITION SYMBOLS LEGEND NEW BUILDING CONSTRUCTION PROPOSED SILT FENCE > I WATER FLOW ARROW c .. .... .... ... ... I EXISTING GRADE CONTOUR 1-917-1 PROPOSED GRADE CONTOUR PROPOSED INLET PROTECTION SEE DETAIL 6/C6 VIA 11 4 BASIS OF BEARING: BASIS OF BEARING IS S00033'l ALONG THE EAST LINE OF NE QUARTER OF SECTION 31, TOWNSHIP 27 NORTH, RANGE 4 EAST AND IS BASED SNOHOMISH COUNTY SURVEY CONTROL POINTS MTLK 113 AND MTLK 119. VERTICAL DATUM: WSDOT SURVEY CONTROL, BENCH MARK #HC 17-12,3" DIAMETER BRASS DISC SET IN THE NORTH SIDEWALK OF THE OVERPASS AT THE INTERSECTION OF INTERSTATE HIGHWAY 5 AND SOUTH 216TH STREET. ELEVATION OF 481.293 FEET, NAVID 88. PROJECT BENCHMARK: FIRE HYDRANT SOUTH PROPERTY LINE TOP OF FLANGE 392.40 . . ............. 361.uu TC �PVT 386.bu: 3 oij 5 ........... AA\ '20Q 7r, k 3138 25 . ... ...... . -9.1A I TC 394.19 C 39?.V PVT= 393. 2 T PVT = 393.15 ..... . . ........ ................. PVT 393.50 394.9 F 394.40 PVT 394.58 X I L; PVT e\c-) GENERAL NOTES, A. REFER TO PROJECT MANUAL FOR ADDITIONAL REQUIREMENTS. B. SITE CONDITIONS BASED UPON SURVEY SUBMITTED BY OWNER. FIELD VERIFY EXISTING CONDITIONS BY DETAILED SITE INSPECTION PRIOR TO SUBMITTING BID AND BEGINNING CONSTRUCTION. C. FIELD VERIFY SANITARY SEWER SERVICE CONNECTION INVERT PRIOR TO ESTABLISHING FINAL FINISHED FLOOR ELEVATION AND PRIOR TO ANY SEWER AND UTILITY INSTALLATIONS. D. COORDINATE WORK WITH OTHER SITE RELATED DEVELOPMENT DRAWINGS. E. ALL WORK WITHIN RIGHT-OF-WAYS OR EASEMENTS MAY NEED PERMITS OR APPROVALS. THE CONTRACTOR IS RESPONSIBLE FOR ALL PERMITS, APPROVALS AND AGREEMENTS TO WORK WITHIN RIGHT-OF-WAYS OR EASEMENTS. F. THE CONTRACTOR SHALL STRICTLY ADHERE TO THE PROPOSED LIMITS OF DISTURBANCE, AND ALL PROPOSED CONSTRUCTION LAYDOWN AND STAGING AREAS SHALL BE CONFINED WITHIN THE PROPOSED LIMITS OF DISTURBANCE. TOTAL DISTURBED AREA, DURING CONSTRUCTION, SHALL NOT EXCEED 1.0 ACRES - REFER TO STORMWATER SUMMARY BELOW. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY FILING, FEES AND ANY WORK AND APPROVALS REQUIRED, IF DISTURBANCE EXCEEDS 1.0 ACRES, OR REQUIRED BY LOCAL LAW. ANY ASSOCIATED DELAYS IN CONSTRUCTION OR PROJECT SCHEDULING SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. G. ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL CITY OF EDMONDS STANDARDS AND SPECIFICATIONS. F.F.E. 395.80 CONSTRUCTION EGRESS NOTES9 1. CONSTRUCTION EGRESS SHALL HAVE 25' MINIMUM RADIUS, BE 15' MINIMUM WIDTH OR FULL WIDTH OF INGRESS/EGRESS AND 50 MINIMUM LENGTH AND 8-12 MINIMUM THICKNESS OF QUARRY SPALLS (2" - 4"). REFER TO THE CITY OR STATE FOR ANY ADDITIONAL REQUIREMENTS. 2. THE EXIT SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOW OF MUD OR DEBRIS ONTO PUBLIC RIGHT-OF-WAY OR ADJACENT PROPERTIES. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH 1.5 - 3.5 INCH STONE, AS CONDITIONS DEMAND, AND REPAIR AND/OR CLEAN OUT OF ANY STRUCTURE USED TO TRAP SEDIMENT. ALL MATERIALS SPILLED, DROPPED, WASHED, OR TRACKED FROM VEHICLES OR SITE ONTO ROADWAYS OR INTO STORM DRAINS MUST BE REMOVED IMMEDIATELY. 3. WHEELS MUST BE CLEANED TO REMOVE MUD PRIOR TO ENTRANCE ONTO PUBLIC RIGHT-OF-WAY. WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA WITH CRUSHED STONE WHICH DRAINS INTO AN APPROVED SEDIMENT TRAP OR SEDIMENT BASIN LOCATED PER THE CITY OR STATE REQUIREMENTS. ag, 0 FACILITIES. CHECK ADJACENT AREAS DAILY AND PICK-UP CONSTRUCTION WASTE MATERIALS AND DEBRIS THAT HAVE BLOWN OR WASHED OFF SITE. FOR TH 2. PERMANENTLY STABILIZE ALL SURFACE AREA WITHIN AND ADJACENT TO THIS SITE THAT IS DISTURBED BY VEHICLES, GRADING AND OTHER CONSTRUCTION E PROPOSED FACILITY. STABILIZATION IS OBTAINED WHEN THE DISTURBED SURFACE COVERED WITH STRUCTURES, PAVING AND/OR PERENNIAL VEGETATION HAVING A UNIFORM COVERAGE DENSITY OF AT LEAST 1000%. STABILIZATION OF ALL DISTURBED AREAS IS REQUIRED BEFORE TERMINATING MAINTENANCE AND REMOVAL OF EROSION CONTROL MEASURES. ALL DISTURBED WILL BE COMPOST AMENDED CONSISTENT WITH 2005 STORMWATER MANUAL DETAIL T5.13. z 6 cb(� 4. INSTALLATION OF ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED AT ANY TIME DUE TO UNFORESEEN SITE CONDITIONS. <: D, 5. CARE SHALL BE TAKEN TO PREVENT THE ENCROACHMENT OF SEDIMENT INTO ALL STORM DRAIN APPURTENANCES, PUBLIC STREETS, AND ONTO PRIVATE PROPERTY �111% , HANDICAP AREA TO BE ADA COMPLIANT. SLOPES SHALL NOT EXCEED 2% IN ANY DIRECT ON IN TH S AREA. UNTIL IMPERVIOUS MATERIAL (ROAD/PARKING AREA SURFACE) IS APPLIED OR UNTIL PROPOSED LANDSCAPE AND PERMANENT SEEDING HAS BEEN ESTABLISHED. '2 HANDICAP PARKING DETAIL 6. REFER TO ALL TESC DETAILS. SCALE: V= 10' 7. ALL GRASS SLOPES WHICH EXCEED 3:1 (H:V) SHALL UTILIZE CONTECH CONSTRUCTION PRODUCTS PERMANENT TURF REINFORCEMENT MATS C35 OR APPROVED EQU MATS SHALL BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS AND STANDARDS. CONTRACTOR SHALL COORDINATE INSTALLATION INSPECTION WITH (CITY OF EDMONDS BMP MANUFACTURER AND GEOTECHNICAL INSPECTOR NOTES. P" , % 399.0N % "it ti ,n ,n ... .... ....... _ \ c )'Rei11yAutoPl/ 10M7 75�0- SQ. FT. = 7,500 Zl LOOR ELEVATION. 395.80 FLooRELEVATION SUCCEEDING SHEETS: I 3�TTOM OF FOoTINGaEV= IES PVT 395.80 PVT 395.60 PVT 395.60 z I -_ PVT 395.80 VT 95.80 DEA , / ffll X PVIF-= 395-. t7 TC = 395.50 PVT = 395".,90 'MW R TC 396.95 T 395.75", _r 3V6 10 .0 PVT 395. TC = 396.80 PVT ='APIAR 395- TC 395.35 PVT 'AQA AR TC 3!V. 30 - PVT 0 01 -.6 4 TC = 394.5 TC = 395.35 PVT = 394.0 �T 394.85 TC = 394.65 PVT = 394.15 TC = 394.80 PVT 394.30\ TC 395.90 PVT 1QR A6 TC 394.90 I I PVT= 394.40 % Tc = I 4.40 % ....... .......... -.1-.1 \ 1, .. /� D D . ........ . ....... 5/� PROJECTBENUHMARK TOP OF FLANGE=392.4' 1) PRESERVE VEGETATION/COVER SOILS. A) PRESERVE AS MUCH NATIVE VEGETATION AS POSSIBLE. BE SURE TO OBSERVE CLEARING AND GRADING LIMITS, AND COMPLY WITH ALL CITY VEGETATION PRESERVATION AND STREAMNVETLAND SETBACK REQUIREMENTS. TIME THE CL=ARING SO IT OCCURS NO SOONER THAN NECESSARY FOR SUBSEQUENT CONSTRUCTION ACTIVITIES. B) PROVIDE TEMPORARY VEGETATION/COVER AS NEEDED. EXAMPLES OF THIS INCLUDE; TEMPORARY SEDDING/HYDROSEEDING; MULCH, SUCH AS HAY STRAW, OR WOOD FIBER; MATS/BLANKETS. SUCH AS JUTE MAT EXCELSIOR; WOVEN STRAW BLANKET; OR NETTING; PLASTIC SHEETING WITH ANCHORS, C) PROVIDE PERMANENT VEGETATION COVER AS SOON AS EARTHWORK IS COMPLETE (SEEDING OR HYDROSEEDING OR SODDING) 11) CONTROL RUNOFF DURING C(INSTRUCTION: REDUCE RUNOFF VELOCITIES. TECHNIQUES INCLUDE; VEGETATING EXPOSED SOILS AND DITCHES; RIPRAP; CHECK DAMS INCLUDING STRAW BALES, ROCKS, PEA GRAVEL BAGS, AND SAND BAGS; TERRACING OR CONTOURING THE SITE; AND FILTER FABRIC FENCING 111) INSTALL AND MAINTAIN SEDIMENT CONTROLS. A) INSTALL SEDIMENT CONTROLS SUCH AS: 1) LOWER COST (NON -ENGINEERED), FILTER FABRIC FENCE, CHECK DAMS, ROCKBERMS, SEDIMENTTRAPS, AND CATCH BASINSAND DRAIN FILTERS. 2) MODERATE COST (ENGINEERED), INTERCEPTING DITCHES, CUT-OFF TRENCHES, LEVEL SPREADER, AND GRADIENT TERRACI NG/CONTROU RING. 3) HIGHER COST (ENGINEERED), SILTRATION/SEDIMENTATION POND, GRASS -LINED SWALE OR CONSTRUCTED WETLAND. B) MAINTAIN SEDIMENT CONTROLS BY FREQUENT INSPECTION OF CONTROL FACILITIES TO MAKE SURE THEY ARE WORKING PROPERLY (TRAPPING SEDIMENT ON -SITE, WITH WATER LEAVING SITE CLEAR), AND REMOVING COLLECTED SEDIMENTAS NEEDED FROM SEDIMENT TRAPS. IV) KEEP FRESH CONCRETE MORTAR OUT OF STORM DRAINS AND STREAMS. A) USE DESIGNATED WASH -OUT AREAS. B) TAKE CARE WHEN BUILDING CONCRETE AGGREGATE DRIVEWAYS MAKING SURE TO WASH OUTTHE FINES TO THE SIDE, NOT DOWN THE DRIVEWAY, IF THE DRIVEWAY IS SLOPED, PLACED STRAW BALES AT THE BOTTOM OR DIVER FLOW TO A SAFE SEDIMENT BASIN. C) NEVER WASH FRESH CONCRETE MORTAR INTO THE STORM DRAIN ORA STREAM. V) KEEP BUSINESS AND WORK AREAS CLEAN AND MAINTAIN CATCH BASINS. EXAMPLES INCLUDE: PICKING UP LITTER, SWEEPING SURFACES WHICH DRAIN TO STORM DRAIN, USING A TARP TO COVER THE GROUND WHEN SANDING TO CATCH CHIPS, CLEANING UP ALL WASTES AT THE WORK SITE, MAINTAINING CONSTRUCTION EQUIPMENT TO FIX ANY OIL LEAKS, INSTALLING AND MAINTAINING AN OIL/WATER SEPARATOR, COVERING ALL STOCK PILED MATERIALS, AND CLEANING CATCH BASINS. VI) COVER CONTAINERS AND MATERIALS. A) COVER ALL POTENTIALLY POLLUTING MATERIALS SUCH AS DUMPSTERS, WASTE CONTAINER DRUMS, TANKS, BOXES, CHEMICALS, PAINTS, SOLVENTS, STOCKPILES OF LUMBER, OTHER BUILDING MATERIAL, METAL PRODUCTS, TOP SOIL, AND LANDSCAPING MATERIALS. B) COVER ADEQUATELY BY DEVELOPING GOOD STORAGE AREAS THAT KEEP MATERIALS COVERED SO POLLUTANTS CAN'TWASH AWAY DURING RAIN OR SNOW. ... . ....... V11) PREPARE FOR AND CLEAN UP SPILLS. A) THERE ARE THREE OVERALL PRACTICES TO MINIMIZE POLLUTION FOR SPILLS: 1) HANDLE MATERIALS CAREFULLY TO AVOID SPILLS AND LEAKS, 2) PREPARE A CLEAN UP PLAN, AND 3) IMMEDIATELY CLEAN UP ANY SPILLS. WHEN PREPARING A CLEAN UP PLAN MAKE SURE TO: a) ESTABLISH WHO TO NOTIFY IN THE EVENT OF A SPILL, b) PROVIDE SPECIFIC CLEAN UP INSTRUCTION, C) ASSIGN A PERSON TO BE IN CHARGE OF CLEAN UP, AND d) PREPARE SPILL CONTAINMENT AND CLEAN UP KITSNHICH ARE EASY TO REACH AND USE. REMEMBER TO CLEAN UP SPILLS IMMEDIATELY, AND OBSERVE CLEAN UP PLANS AND SAFETY REQUIREMENTS. IF THERE ISN'TA PLAN, TAKE THE FOLLOWING STEPS: 1) STOP OR ISOLATE THE SOURCE OF THE SPILL, 2) IF THERE'S A CHANCE THE SPILL COULD ENTER THE STORM DRAIN OR SEWER, CLOSE DRAIN INLET AND DIVERT ANY INCOMING WATER. 3) COVER THE SPILL WITH ABSORBENT MATERIAL(S) THAT CAN BE EASILY SWEPT OR PICKED UP SUCH AS KITTY LITTER, SAWDUST, OR VERMICULITE (MAKE SURE THAT MATERIAL SUED FOR HAZARDOUS WASTE CLEAN UP ARE TREATED AS HAZARDOUS WASTE FOR DISPOSAL), AND 4) REPORT SPILLS TO CITY OF EDMONDS ENGINEERING DIVISION, HYDRAULICS ENGINEER AT 425-771-0220: OR FOR LARGE SPILLS, CONTRACT DEPARTMENT OF ECOLOGY AT 425-649-7000. Vill) DISPOSE OF WASTES PROPERLY. PROPER WASTE DISPOSAL DEPENDS OF BOTH THE PROPERTIES AND THE AMOUNT OF THE WASTE. TO DISPOSE OF WASTE: 1) IDENTIFY IF IT IS HAZARDOUS, 2) ESTIMATE THE AMOUNT IN POUNDS, 3) DETERMINE THE DISPOSAL METHOD, AND 4) IF NECESSARY, CONTACT A HAZARDOUS WASTE SERVICE. THIS IS A VERY BROAD SUBJECT AND IF YOU HAVE ANY QUESTIONS ABOUT THE WASTE DISPOSAL CONTACT THE CITY OF EDMONDS RECYCLING COORDINATOR AT 425-771-0235; OR THE SNOHOMISH COUNTY HOUSEHOLD HAZARDOUS WASTE DISPOSAL STATION AT 425-388-6050. IX) MINIMIZE WASTE. WASTES CAN BE MINIMIZED THROUGH GOOD HOUSEKEEPING, SEPARATING DIFFERENT WASTES, SUBSTITUTING NON -HAZARDOUS MATERIALS IN THE PLACE OF HAZARDOUS ONES, AND MAINTAINING PRODUCTS AND CONSTRUCTION EQUIPMENT. REDUCING WASTES REDUCES POTENTIAL SOURCES OF POLLUTANTS TO THE DRAINAGE SYSTEM AND ALSO PRESERVES NATURAL RESOURCES. THE FOLLOWING AREA FEW IDEAS: 1) USE SOLVENTS MORE THEN ONCE, 2) BUY THE LEAST TOXIC PRODUCTS AVAILABLE, 3) BUY ONLY WHAT YOU NEED AND USE ONLY WHAT IS NEEDED, 4) PURCHASE PRODUCTS THAT LAST LONGER (BETTER QUALITY), AND 5) SEE IF OTHERS CAN USE YOUR WASTE (USE THE SERVICES OF THE INDUSTRIAL MATERIALS EXCHANGE 206-296-4899), FOR MORE INFORMATION CONTACT THE CITY OF EDMONDS RECYCLING COORDINATOR AT 425-771-0235. X) RECYCLE UNWANTED MATERIALS. UNWANTED MATERIALS PRODUCED AT CONSTRUCTION SITES CAN OFTEN BE RECYCLED, AT LESS COST THAN CONVENTIONAL DISPOSAL METHODS. THE CITY HAS RECYCLING GUIDES AVAILABLE REGARDING CONSTRUCTION, DEMOLITION, AND LAND CLEARING (CDL) ACTIVITIES. THE RECYCLING GUIDE LIST SITES THAT ACCEPT CDL MATERIALS, AND OUTLINES HOW TO ST-UP WORKSITE RECYCLING. OTHER WAYS TO MAKE RECYCLING WORK ARE: 1) PURCHASE RECYCLED PRODUCTS, 2) SEPARATE WASTES, 3) AVOID PHENOL, 4) KEEP RECEIPTS, AND 5) RECYCLE WHAT YOU CAN. XI) PRESERVE/EN HANCE STREAMS, WETLAND, AND ADJACENT VEGETATION. PROTECT STREAMS AND WETLANDS, REMEMBER, STREAM AND WETLAND PROTECTION IS REQUIRED BY CITY OF EDMONDS CODES, CONTACT CITY OF EDMONDS, PLANNING DIVISION -771-0220 FOR MORE INFORMATION. AT 425 \ X11) EDUCATE EMPLOYEES AND CUSTOMERS. PARTICIPATE IN WORKSHOPS, COURSES, AND KNOWLEDGE TRANSFER. CONDUCT ANNUAL WATER QUALITY TRAINING SESSIONS FOR ALL EMPLOYEES. INCLUDE WATER QUALITY TRAINING IN NEW -EMPLOYEE ORIENTATIONS AND IN WRITTEN PROCEDURES. MAKE SURE CUSTOMERS ARE AWARE OF BMPS'AND EXPLAIN BMP'S TO PEER BUSINESSES. REMEMBER, WATER QUALITY IS THE RESPONSIBILITY OF EVERYONE. C1 PROPERTY PR(� )PERTY LINE 4 10 - LINE i ADA SIDEWALK AREA (2% MAX. S Al ADA LOADING AREA EXISTING GROUND (2% MAX. CROSS -SLOPE) '.0 [A I \\.--PROPOSED GROUND EXISTING STREET j'AQ '110TED SECTION "AwAll s �s � �Jl LS t301"j, EXISTING SIDEWALK EXISTING STREET PROPERTY LINE EXISTING GROUND r- A ----------- SCALE: NOT TO SCALE PROPERTY LINE SEAL: opff LN 4" W ix er - - ---- .......... EXPIRE,$ Y// 5 h/ M. CHRISTOPHER ROGERS, P.E. 9-1-11 38600 u) C) C) 86 Cy) LIJ 0 om ry all C() SHEET TITLE: SITE GRADING/TESC PLAN REVISIONS: NO: ......................... DATE: .................................... BY: 1 i ............... ..................................... 2-11 ...... ..................................... CITY 2 .............. ........... 7-15-11 CITY ............... 5 9-1-11 CITY ull ................ ............................. .......... ............... ............ ............. CiTy OF SIDNONDS ..................................... ..................................................... PROJECTNO: 26444 . .... - - - - - ___ JTA DRAWN BY: . ................. . .. A SHEET 2 OF 10 COPYRIGHT BRUCE M. CARLSON, AIA 2008 I�Y 0- 41 -s m "A F — F— LLJ Cn Ly Of LLj i F— W 0 0 00 — 15 P. O.B. FOR LA YOUT OF NEW S1 DEVELOPMENT IS PARALLEL & PERPENDICULAR TO S.R. 99 R1W LINE - (N 27� 00'35" E) 226.4 V 1+1 01 LEGAL DESCRIPTION,m THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE COUNTY OF SNOHOMISH, STATE OF WASHINGTON, AND IS DESCRIBED AS FOLLOWS: PARCEL B, CITY OF EDMONDS LOT LINE ADJUSTMENT FOR ARMADILLO STORAGE, RECORDED UNDER SNOHOMISH COUNTY RECORDING NUMBER 200412105223, RECORDS OF SNOHOMISH COUNTY, WASHINGTON. 5 Z4 LOT INFORMATION. PARCELM 00576700001410 ZONING: (CG) - GENERAL COMMERCIAL SETBACKS: SIDE YARD - 0' STREET SETBACK - 4' REAR SETBACK - 0' I f e, �o 15 21 21 4 0 17 w" 'D' X.- . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . x . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . x M . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15.00'. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . .. .. . .. . . ........................ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ....... . . . . . . . 14 ................................... ..................... TYP. 00'. 00� (Ty-P) ....... ........ ..... 6�) ...................... .. .... ... .................... TY ....... .... ..... ............ ... ...... .... ................. .. .............. ................ r-� =� C ....................... . .......... .... ....... . .................... . ....... . .................... ........................ .............. ........................ 4 ...... ...... ................. ................. ... .............. ....................... ....................... �Ty P ................ 3 ............... .................. X .................... ....... 30.001 ..... .............. ........ ... DTT1 3�*--- .......... .... .............. A .......... :0 .... ..... ......... 10'RefflyAuto Parts .0 ........... -011x 7 100, 75'-0" SQ. FT = 7,500 `9 .... .. Af ---- \> OOR ELEVA TION: 395 80 x FL ooR aEVA TION ON SUCCEEDING SHEETS: 100.00 1 f) Fz! .......... 7 ........... tU- ........... .............. < ..... . . ... P. A ... ........... 6 X..... ...... ... 16 ..... ................ . .......... 4 .. ........... AI EA R ... ............ .......... R D ..... ........ .............. 00 ........ .. ..... ............ .. ..... ......... .... ... ... ............ ... ... 16 .......... \ ............. .-.\C5y ... . ... ... ...... yp. . . . . . . . . . . . . . . . . . . . . . . . . N . ...... 3 ... . . . . . . . . . . . . . . . .... 9. .9.00 .......... ... 7yj .17.00'- j. 4 .......... ... .......... . ......... ............. ....... ........................... ...... ..... .... .... .... ......... . ......... ............... ...... . ......... . ... ............ ............... .............. ....................... ....... .. ........... . ........... 12 6,: FiE�Cr--�l -N-0% -201`6011 �.. " D9 ........ ........ .................. 3 . ........ -\ ........................ .... 22 .,.,q.,00 ........... U U11 ... ... ........... ................. ........ ... ... ..TY ..... . :Y%.E. ....... .... . ... ... ......... .. ...... .... ... ....... . .... .... ... .... .... ... . ............ �X\ 16 Y/\ K ,n "; X—X I \ ', \ 11 \ I \ \ \ I I /,, . " , 11 \ " , X\ - , I o5,c+ -,w "K . v .11 ) "XI"" b8-51 -1.\ I N57' 40 Ln . ...... 81.61 ITO"Pwv6l�h:��G ='B"' .... . ......... .. .......... ........ ...... ...... . ..... ..... ..... ... -w . ... . . . ................... .... ..... ..... ..... .... ...... ..... ..... ................. .... .. ...... ...... . ... ...... . . . ...... .. .... .... .. ... . ... .......... . .......... ... ...... . ...... ..... ........... . .. ...... .... N62*59'27"W '113.24' ... . ...... ...... .. ...... ...... m C2 J SCALE: 11" = 20' C-\ � 6 T x cv, \0, W, JU3, �'i g(Jv�7'I i 1�,Y �A IkAlu At STANDARD STALLS (9'xl9') 32 STALLS ACCESSIBLE STALLS (8'xl9') 2 STALLS TOTAL PARKING STALLS 34 STALLS uiv�- SYMBOLS LEGEND REFER TO SURVEY FOR EXISTING CONDITION SYMBOLS LEGEND NEW BUILDING CONSTRUCTION AREA OF CONCRETE AREA OF PAVING ..... .......... ............... ................ ............... ................ .............. PUBLIC ROADWAY REPAVE/RE 5 NEW POLE SIGN LOCATION NEW CONCRETE BUMPER BLOCK NEW LIGHT POLE LOCATION NEW FENCE CONSTRUCTION LANDSCAPE AREA DCONCRETE PAVING: REFER TO DETAIL 1/C5. ALTERNATE #1: ASPHALT PAVING REFER TO DETAIL 2/C5. REFER TO PROJECT MANUAL. CONCRETE PAVING: REFER TO DETAIL VC5. CONCRETE CURB: REFER TO DETAIL 3/C5. CONCRETE SIDEWALK: REFER TO DETAIL 4/C5. CONCRETE DOOR LANDING: REFER TO DETAIL 4/C5 AND STRUCTURAL DETAILS. RAMP PAVING AS INDICATED. LANDING CAN BE POURED MONOLITHIC IF CONCRETE PAVING IS USED. STEEL BOLLARD: REFER TO DETAIL 6/C5. PROVIDE (2) AT TRASH PAD AND OVERHEAD DOOR, PROVIDE (9) AT SIDEWALK. REFER TO STRUCTURAL PLAN FOR LOCATION. HANDICAP PARKING SIGN: REFER TO DETAIL 7/C5. NOT USED HANDICAP PARKING SYMBOL: REFER TO DETAIL 5/C5. HANDICAP ACCESS UNLOADING ZONE: SLOPE 2% MAX. EACH WAY (ADA COMPLIANT) AND STRIPE AS SHOWN. SCREEN FENCE: REFER TO DETAIL 9/C5. SCREEN FENCE GATES: REFER TO DETAIL 8/C5. CONCRETE BUMPER BLOCK: 8"w x 5"h x 6'-0" LONG CONCRETE. ANCHOR TO PAVING WITH (2) V-6" LONG #4 REBAR. REFER TO CITY OF EDMONDS STANDARD DETAIL E2.7 14 LU I Lit-'" I INU I�EFER TO —SITE- UTILITIES PLAN FOR LOCATION AND TYPE LIMITS OF NEW PAVING: MATCH EXISTING PER CITY AND OR STATE STANDARDS. ROLL DOWN CURB: —sa-w C 0 TERMINATE AND ROLL DOWN NEW CURB WHERE D WN AT 1:2. TAPER CURB TO MATCH EXISTING CURB PER CITY OF EDMONDS OR WSDOTIAPWA STANDARDS/SPECIFICATIONS. STRIPING: PROVIDE 4" WIDE PARKING LOT STRIPING AS SHOWN. USE HIGHWAY MARKING PAINT - YELLOW (2 COATS) EMENT MARKINGS SHALL CONFORM TO SECTION 8-22 PAVEMENT MARKINGS OF WSDOT/APWA STANDARD SPECIFICATIONS SIGN LOCATION: SIGN FURNISHED AND INSTALLED BY OWNER.REFER TO SITE UTILITIES PLAN FOR DETAILS. SIGN SHALL BE REVIEWED UNDER THE REQUIREMENTS OF THE BUILDING DIVISION DCONCRETE DRN 2O TO BE INSTALLED PER CITY OF EDMONDS STANDARD DETAIL. SEE 7/C6. ADA PED RAMPS: TO BE INSTALLED PER CITY OF EDMONDS DETAIL E2.1-5 SEE 8/C6 RECYCLE TRASH ENCLOSURE PER CITY OF EDMONDS DETAILS/SPECIFICATIONS SEE 3/C6 WSDOT DRIVE APRON TYPE 2: TO BE INSTALLED PER WSDOT STANDARD PLAN F-80.10-01 SEE 1/C7,2/C7,3/C7 230th STREET TO BE REPAVED/REPAIRED AND STRIPED PER CITY SPECIFICATIONS AFTER STORM SEWER SYSTEM IS INSTALLED. MATCH EXISTING PAVEMENT, THICKNESSES, MATERIALS OR PER Cl TY STANDARD. a GENERAL NOTES. A. REFER TO PROJECT MANUAL FOR ADDITIONAL REQUIREMENTS. B. ALL SITE DIMENSIONS TO THE GUTTER LINE OF CURB, CONCRETE OR PROPERTY LINE UNLESS OTHERWISE NOTED. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS BY DETAILED INSPECTION PRIOR TO SUBMITTING BID AND STARTING CONSTRUCTION. C. COORDINATE WORK WITH OTHER SITE RELATED DEVELOPMENT DRAWINGS. D. REFER TO STRUCTURAL PLANS FOR DEVELOPMENT OF SIDEWALKS ADJACENT TO FOUNDATIONS. E. ALL WORK WITHIN RIGHT-OF-WAYS OR EASEMENTS REQUIRE SEPARATE PERMITS AND APPROVALS. THE CONTRACTOR IS RESPONSIBLE FOR ALL PERMITS, APPROVALS AND AGREEMENTS TO WORK WITHIN RIGHT-OF-WAYS OR EASEMENTS. F. REFER TO PLAN C1 FOR NOTES AND REQUIREMENTS REGARDING LIMITS OF DISTURBED AREAS. G. ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL CITY OF EDMONDS STANDARDS AND SPECIFICATIONS AND CURRENT WSDOT SPECIFICATIONS. H. MAXIMUM PARKING LOT SLOPE NOT TO EXCEED 6% PER CITY OF EDMONDS STANDARDS. BRUCE M. CARLSON architecture - planning - interior design BRUCE M. CARLSON, ARCHITECT 219 N. 2ND ST., SUITE 301 MINNEAPOLIS, MN 55401 PHONE: (612) 338-6677 FAX: (612) 338-2995 E-MAIL: info@cmarch.com CONTACT: JESSICA IVERSON jiverson@cmarch.com CONSULTANTS: CEI ENGINEERING, INC. 2277 WEST HIGHWAY 36, SUITE 200 ROSEVILLE, IVIN 55113 PHONE: 651-697-0800 FAX: 651-697-0804 CONTACT: ALAN CATCHPOOL smommm SEAL: M. CHRISTOPHER ROGERS, P.E. 9-1-11 DATEISSUED 38600 REG. NO. U) 0 C) < C) 0 86 :2 CY) LLJ Y) SHEET TITLE: SITE DEVELOPMENT PLAN REVISIONS: NO: -."I"",", DATE: ............................... .... BY: 1.111-111.111-1--1 1 2-11-11 .............. ............... CITY .............. ................ ... ............ TY ................. 5 1 9-1-11 CITY 1 '--djtY OF FD� NDS ................ -, ........................ ........... PROJECT NO: 26444 ............ .. -111111-1-1 . .......... DRAWN BY: JTA .......................... . .... . ................................ . C 2 SHEET 3 OF 10 L t L c c c 0 04 T Ln 0 0 0 (D 04 I--, SITE DRAINAGE PLAN C3 I SCALE: I" = 20' IM L_ A. REFER TO PROJECT MANUAL FOR ADDITIONAL REQUIREMENTS. B. SITE CONDITIONS BASED UPON SURVEY SUBMITTED BY OWNER. FIELD VERIFY EXISTING CONDITIONS BY DETAILED SITE INSPECTION PRIOR TO SUBMITTING BID AND BEGINNING CONSTRUCTION. C. FIELD VERIFY SANITARY SEWER SERVICE CONNECTION INVERT PRIOR TO ESTABLISHING FINAL FINISHED FLOOR ELEVATION AND PRIOR TO ANY SEWER AND UTILITY INSTALLATIONS. D. COORDINATE WORK WITH OTHER SITE RELATED DEVELOPMENT DRAWINGS. E. ALL WORK WITHIN RIGHT-OF-WAYS OR EASEMENTS MAY NEED PERMITS OR APPROVALS. THE CONTRACTOR IS RESPONSIBLE FOR ALL PERMITS, APPROVALS AND AGREEMENTS TO WORK WITHIN RIGHT-OF-WAYS OR EASEMENTS. F. THE CONTRACTOR SHALL STRICTLY ADHERE TO THE PROPOSED LIMITS OF DISTURBANCE, AND ALL PROPOSED CONSTRUCTION LAYDOWN AND STAGING AREAS SHALL BE CONFINED WITHIN THE PROPOSED LIMITS OF DISTURBANCE. TOTAL DISTURBED AREA, DURING CONSTRUCTION, SHALL NOT EXCEED 1.0 ACRES - REFER TO STORMWATER SUMMARY BELOW. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY FILING, FEES AND ANY WORK AND APPROVALS REQUIRED, IF DISTURBANCE EXCEEDS 1.0 ACRES, OR REQUIRED BY LOCAL LAW. ANY ASSOCIATED DELAYS IN CONSTRUCTION OR PROJECT SCHEDULING SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. G. ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL CITY OF EDMONDS STANDARDS AND SRECIFICATIONS. H. ALL DISTURBED PERVIOUS SURFACE AREAS (LANDSCAPED AREAS) WHICH ARE TO REMAIN PERVIOUS SHALL RESTORE SOIL QUALITY AND DEPTH BY AMENDING/COMPOSTING SOILS (PER D.O.E. BMP T5.13). 00111, �' 5 A, 1. STORM DRAINAGE SYSTEM WAS DESIGNED BY LSA ENGINEERING, INC. '00 SYMBOLS LEGEND REFER TO SURVEY FOR EXISTING CONDITION SYMBOLS LEGEND NEW BUILDING CONSTRUCTION AREA OF CONCRETE NEW POLE SIGN LOCATION NEW CONCRETE PAVING BLOCK NEW LIGHT POLE LOCATION TCITSIPVTITG TOP OF CURB/TOP OF SIDEWALK/TOP OF PAVEMENT/TOP OF GRATE > WATER FLOW ARROW . .... .... f .. .... .... .... ... ..... EXISTING GRADE CONTOUR PROPOSED GRADE CONTOUR _917- =Eg = @ PROPOSED STORM SEWER, CATCH BASIN AND INLET MANHOLE IMPERVIOUS AREAS BUILDING AREA 7,500 SF DRIVEWAY AND PARKING 21,600 SF TOTAL 29,100 SF (0.668 AC) LIN� TYPE AREA (SQUARE FEET) NON -REGULATED 0 EXEMPT REGULATED 2. REPLACED 0 0 3. NEW (POST 1977) + 29,100 4. TOTAL REGULATED IMPERVIOUS AREA 29,100 5. TOTAL AREA MITIGATED BY EXISTING STORMWATER MANAGEMENT SYSTEM(S) 0 6. REGULATED AREA NOT YET MITIGATED 29,100 7. AREA PRDPOSED TO BE MITIGATED BY LOW IMPACT DEVELOPMENT TECHNIQUES 0 EA PROPOSED TO BE MITIGATED THROUGH CONVENTIONAL SWM TECHNIQUES 29,100 �t i [(ok'l if ; d INSTALL CATCH BASIN - TYPE 1, (PER DOT STANDARDS) RIM - 393.90 FL(OUT) - 391.00 (8") SUMP - 389.90 INSTALL 94 LF OF 8" PVC PIPE. SEAL WITH NON -SHRINK GROUT SLOPE - 0.70% INSTALL CATCH BASIN - TYPE 2-48", (PER DOT STANDARDS) RIM - 395.80 FL(IN) - 390.34 (8") FL(OUT) - 390.24 (8") SUMP - 388.24 INSTALL 144 LF OF 8" PVC PIPE. SEAL WITH NON -SHRINK GROUT SLOPE - 0.60% INSTALL CATCH BASIN - TYPE 1-L, (PER DOT STANDARDS) RIM - 392.90 FL(IN) - 389.50 (6") FL(IN) - 389.38 (8") FL(OUT) - 389.28 (8") SUMP - 387.28 WITH OILIWATER SEPARATOR TEE SEE DETAIL 1/C8 INSTALL 83 LF OF 8" PVC PIPE. SEAL WITH NON -SHRINK SLOPE - 2.00% INSTALL CATCH BASIN - TYPE 1-L, (PER DOT STANDARDS) RIM - 386.50 FL(IN) - 382.80 (8") SUMP - 380.80 WITH OIL/WATER SEPARATOR TEE SEE DETAIL 1/C8 INSTALL 11 LF OF 8" PVC PIPE. SEAL WITH NON -SHRINK GROUT SLOPE - 2.00% INSTALL CATCH BASIN - TYPE2 54" CONTROL STRUCTURE RIM - 389.0 FL(IN) - 382.58 (8") FL(IN) - 377.50 (36") FL(OUT) - 378.00 (8") SUMP - 374.00 SEE DETAIL 3/C8 INSTALL 70 LF OF 96" CMP DETENTION TANK SLOPE - 0.50% FL - 377.50 SEE DETAIL 3/C8 A INSTALL 7 LF OF 8" PVC PIPE. SEAL WITH NON -SHRINK GROUT SLOPE - 5.0% INSTALL FLOGARD PERK FILTER - TYPE 2-48" (2-18" CARTRIDGES) RIM - 388 00 FL(IN) - 377.65 (8") FL(OUT) - 375.35 (8") SEE DETAIL 2/C8 INSTALL 30 LF OF 8" PVC PIPE. SEAL WITH NON -SHRINK GROUT SLOPE - 1.0% INSTALL CATCH BASIN - TYPE 2 48", (PER DOT STANDARDS) RIM - 385.80 (SOLID LID) FL(IN) - 375.05 (8") FL(OUT) - 374.95(12") INSTALL 105 LF OF 12" PVC PIPE. SEAL WITH NON -SHRINK GROUT SLOPE - 0.6% CONNECT NEW 12" PVC TO EXISTING CATCH BASIN. FL - 374.32 S�n5 'SWI 1,;,e, -fooka 'A 4o re-cioca f�o_ C* pb It l4wis 4cm vekide-s tr,) lka-- V� IC-* yc" .......... BASIS OF BEARING: Ut- btAKINU 16 bUU�33'48"E ALONG THE EAST LINE OF NE QUARTER OF SECTION 31, TOWNSHIP 27 NORTH, RANGE 4 EAST AND IS BASED SNOHOMISH COUNTY SURVEY CONTROL POINTS MTLK 113 AND MTLK 119. VERTICAL DATUM: WSDOT SURVEY CONTROL, BENCH MARK #HC 17-12,3" DIAMETER BRASS DISC SET IN THE NORTH SIDEWALK OF THE OVERPASS AT THE INTERSECTION OF INTERSTATE HIGHWAY 5 AND SOUTH 216TH STREET. ELEVATION OF 481.293 FEET, NAVID 88. PROJECT BENCHMARK: FIRE HYDRANT SOUTH PROPERTY LINE TOP OF FLANGE = 392.40 CONSULTANTS: CEI ENGINEERING, INC. 2277 WEST HIGHWAY 36, SUITE 200 ROSEVILLE, MN 55113 PHONE: 651-697-0800 FAX: 651-697-0804 CONTACT: ALAN CATCHPOOL LSA ENGINEERING, INC. 19217 36TH AVE W, SUITE 106 LYNNWOOD, WA 98036 PHONE: 425-775-1591 CONTACT: ROBERT LONG, PE SEAL: M. CHRISTOPHER ROGERS, P.E. 9-20-11 ............... ..................... DATEISSUED 38600 ................................................ ' ........................ U) C) cn < F_ 0 V) C) 0 cy) LL] SHEET TITLE: SITE DRAINAGE PLAN REVISIONS: N 0: DATE: BY: .... . .. . ....................... ..... - - ---- - - - - ------- 2-11-11 : . .... . CITY 2 .............. . .......... -------- 7-15-11 . ...... . . . ........................... CITY 5 ........... ......................... 9-1-11 .................... CITY 6 9-20-11 CITY PROJECT NO: 26444 I ............................................ ...................................................... DRAWN BY: JTA SHEET 4 OF 10 a_ COPYRIGHT BRUCE M. CARLSON, AIA 2008 EXISTING CONDITIONS NOTES 1. THE CONTRACTOR IS OBLIGATED TO INSPECT FOR EXISTING CONDITIONS/INSTALLATIONS AND AVAILABLE INFORMATION PRIOR TO SUBMITTING A BID. REFER TO SPECIFICATIONS ALSO. 2. EXISTING INSTALLATIONS (SUCH AS WATER MAINS/LINES, GAS MAINS/LINES, SEWER MAINS/LINES, TELEPHONE LINES, POWER LINES, AND UTILITY STRUCTURES IN THE VICINITY OF THE WORK TO BE DONE) ARE INDICATED ON THE DRAWINGS ONLY TO THE EXTENT THAT SUCH INFORMATION HAS BEEN MADE AVAILABLE TO OR DISCOVERED BY CEI ENGINEERING. THERE IS NO GUARANTEE AS TO THE ACCURACY OR COMPLETENESS OF SUCH INFORMATION, AND ALL RESPONSIBILITY FOR THE ACCURACY AND COMPLETENESS THEREOF IS EXPRESSLY DISCLAIMED. 3. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR LOCATING ALL EXISTING INSTALLATIONS. 4. ANY DELAY, ADDITIONAL WORK, FEES OR EXTRA COST TO THE CONTRACTOR CAUSED BY OR RESULTING FROM DAMAGE TO OR MODIFICATION OF EXISTING INSTALLATIONS BY THE CONTRACTOR OR AFFECTED UTILITY COMPANY SHALL NOT CONSTITUTE A CLAIM FOR EXTRA WORK, ADDITIONAL PAYMENT OR DAMAGES. 5. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING FEATURES, UTILITIES AND FINISHED GRADES PRIOR TO SUBMITTING HIS BID. NO EXTRAS WILL BE PAID DUE TO UNANTICIPATED EXISTING CONDITIONS OR INSTALLATIONS. 0 TELEPHONE SERVICE REQUIREMENTS SPECIAL NOTE: NEW PHONE SERVICE TO BUILDING SHALL BE UNDERGROUND. CONTRACTORS TO SCHEDULE INSTALLATION OF U/G TELEPHONE SERVICE CONDUIT WITH TELEPHONE COMPANY AND OWNER. CONTACT OWNER (417) 874-7288. 2" PVC SCHEDULE 40 CONDUIT WITH RIGID GALVANIZED STEEL LONG SWEEP BENDS @ 18-24" DEPTH FOR PHONE SERVICE. PROVIDE MINIMUM 1/4" POLYPROPYLENE PULL LINE . PLACE CONDUIT A MINIMUM OF 12" FROM U/G ELECTRIC CONDUIT IN SAME TRENCH. CAP END OF CONDUIT AT PROPERTY LINE, BELOW FINISHED GRADE, AND INSTALL CABLE MARKER FOR PHONE COMPANY, IF NECESSARY. OTHERWISE, CONTINUE PHONE SERVICE CONDUIT TO A POLE AND INSTALL RIGID GALVANIZED STEEL CONDUIT A MINIMUM 10, (ft.) ABOVE FINISHED GRADE ATTACHED TO POLE. CONTRACTOR SHALL COORDINATE INSTALLATION AND VERIFY REQUIREMENTS WITH PHONE COMPANY, PLUS INCLUDE ALL FEES (IF ANY) BY PHONE COMPANY FOR INSTALLATION OF 25 PAIR CABLE, IN MENTIONED CONDUIT, TO CONTRACTOR INSTALLED 4' x 6'xi" FIRE RETARDING BACKBOARD (IF PLYWOOD, PAINT BOARD WITH FIRE RETARDING PAINT) WITHIN BUILDING. CONTRACTOR TO PROVIDE #6 AWG CU. GROUND TO TELEPHONE EQUIPMENT LOCATION FROM ELECTRICAL GROUNDING ELECTRODE SYSTEM. FINAL CONNECTIONS AND INSIDE PHONE WIRING BY OWNER. ONLY IF UNDERGROUND PHONE SERVICE IS NOT AVAILABLE, THEN CONTRACTOR MAY INSTALL APPROPRIATE OVERHEAD PHONE SERVICE RISER, WEATHER HEAD, ETC. COORDINATE WITH OWNER & PHONE CO. SANITARY SEWER CONSTRUCTION NOTE IF REUSING SIDE SEWER; PROPERTY OWNER MUST HAVE CONDITION VERIFIED AND PROVIDE A REPORT AND TC TO THE CITY'S PUBLIC WORKS DEPARTMENT FOR REVIEW. IF REUSING EXISTING SEWER LATERAL: CONDITION MUST BE VERIFIED BY THE CITY'S PUBLIC WORKS DEPARTMENT. CONTACT EDMOND'S SEWER DIVISION: 425-771-0253. SAWCUT NOTE WHERE NEW UTILITY SERVICES ARE ROUTED UNDER EXISTING PAVED AREA, ALL EXISTING PAVING SHALL BE REMOVED IN THE FOLLOWING STEPS: 1 ) SAWCUTTING PAVING, CONCRETE CURB & GUTTER. 2) REMOVAL & TRENCHING. 3) INSTALLATION OF UTILITY. 4) BACKFILL AND COMPACTION. 5) INSTALLATION OF NEW PAVING, CONCRETE CURB & GUTTER THAT MATCHES THE EXISTING SURROUNDING PAVING AND CURB & GUTTER IN BOTH MATERIAL & ELEVATION. CONTRACTOR SHALL COORDINATE, OBTAIN AND PAY FOR ALL REQUIRED PERMITS & LICENSES TO PERFORM THIS WORK & SHALL BE RESPONSIBLE FOR ALL TRAFFIC CONTROL WHILE PERFORMING SAWCUTTING OPERATIONS AS NECESSARY. BORE NOTE WHERE NEW UTILITY SERVICES ARE ROUTED UNDER EXISTING PAVED AREA, ALL PROPOSED WORK SHALL BE PERFORMED IN THE FOLLOWING STEPS: 1) EXCAVATION OF BORING AND RECEIVING PITS. 2) BORING OPERATION. 3) INSTALL CASING. 4) INSTALLATION OF UTILITY. 5) FILL CASING AND EXTEND UTILITIES. 6) BACKFILL, COMPACTION AND RESTORE EXCAVATED AREAS. 5) ALL PREVIOUS EXISTING SITE CONDITIONS SHALL BE NOTED AND SITE SHALL BE BROUGHT BACK TO THIS CONDITION IN BOTH MATERIAL AND ELEVATION. CONTRACTOR TO RE -SEED AND STRAW AS NEEDED. CAUTION: PERMIT REQUIRED CONTRACTOR SHALL COORDINATE, OBTAIN AND PAY FOR ALL REQUIRED PERMITS & LICENSES TO PERFORM THIS WORK & SHALL BE RESPONSIBLE FOR ALL TRAFFIC CONTROL WHILE PERFORMING BORE OPERATIONS AS NECESSARY. BORING CONTRACTOR SHALL COORDINATE WITH CITY AND HIGHWAY/ROAD DEPARTMENT WITH REGARD TO THE LIMITS OF EXCAVATION FOR THE BORING AND RECEIVING PITS. COORDINATE ANY TEMPORARY EASEMENTS AS NECESSARY. UTILITY CONTACTS: REFER TO SV1 & C1 FOR ALL CITY OF EDMONDS CONTACT INFORMATION. CONSTRUCTION NOTE ALL CONSTRUCTION TO BE IN ACCORDANCE WITH THE CITY OF EDMONDS STANDARDS AND SPECIFICATIONS AND WSDOT SPECIFICATIONS. CONTRACTOR CAUTIONHI VERIFY SEWER LINE ELEVATION 4441111F vomwo 1 6 q I COUNTY UTILITY SNOHOMISH COUNTY PUBLIC UTILITY DISTRICT NO.1 MARY McALLISTER PHONE: (425) 670-3214 C WATER & SEWER DISTRICT OVWSD P Y 2A STEVE DUNPHY A -7769 PHONE: (425) 774-7769 GAS PUGET SOUND ENERGY PHONE: 1-888-321-7779 . .... .. COMMUNICATIONS FRONTIER JEREMY FALLT PHONE: (425) 263-4023 COMCAST A -5363 PHONE: (425) 263 01 A\ INV=390.3 6" MIN. OR PER STORMWATER aTENTION SYSTEM PROPOSED STORMWATER DETENTION - SYSTEM. SEE STORMWATER PLAN MANUFACTURES SPECIFICATIONS. .............. ... . ...... PROPOSED 1 "WATER SERVICE.-��z EXTRA DEPTH WATER SERVICE UNDER ... ....... ... . ..... ...... STORMWATER DETENTION SYSTEM. . ... ..... ..... . ... ...... - ........... ...... ..... ........... WATER SERVICE CROSS SECTION ................. N.T.S. 'o PROPOSED UNDERGROUND MIN. SEPARATION PER ELEdTRIC TO BUILDING (UGE, T). CONTRACTOR SHALL SCHEDULE SPECIFICATIONS PROPOSED ELECTRICAL LINE. MIN. INSTALLATION WITH OWNER. SEE DETAIL 4/SU1, MEP PLAAS FOR BURY PER ELECTRIC SPECIFICATIONS. PROPOSED 1 "WATER SERVICE. REQUIREMENTS AND U1 EXTRA DEPTH WATER SERVICE UNDER PROPOSED ELECTRICAL LINE. WATER SERVICE CROSS SECTION 100ow :t7- N.T.S. �4 B 1 2 C4 C4 0, ----------- 1 o0ow MINIMUM SEPARATION PER GAS 3 --N.'�ROPOSED GAS LINE. SPECIFICATIONS B PROPOSED 6" SDR 35 OR D.I. SEWER SERVICE.7 iL PROPOSED ELECT NOTE: WHERE CROSSING OTHER UTILITIES, MAINTAIN 12" CLEARANCE MATCH MANUFACTUREFTS ANCHOR BOLT PATTERN PACK GROUT UNDER POLE To PROVIDE FULL CONTACT WITH DETECTABLE PLASTIC WARNING GROUNDLUG FOOTING TAPE (SPEC 26 05 53) LEVELING NUT AND WASHER RADIUS EDGE 343TIESAT70P U) 1 "0 x 36" HEADED ANCHOR BOLTS W U) (GRADE F1 554) WITH HARDENED < W C) LIGHT FIXTURE AS SPECIFIED STEEL WASHERS. WHEN DESIGN > < — WIND SPEED EXCEEDS I 10 MPH, of 2 >W 0 Lu — W LLJ GRADE F1554 (FY=55k$!) BOLTS a co CL co Lu FINISHED GRADE--\ MUST BE USED (n W of 'i " �, _j c, < W W ..... ..... I I, SLIPFITTER AND MOUNTING BRACKET AS SPECIFIED L) -.4 "I-, if f f i , 0 LL L) 4 .,d "I'M W Q r -?I W 00 _j ��`T -j 4- W p=ff fT i J. �jl C,4 W 2� ij—j i i ZD ELECTRICAL CONDUIT(S). SEE PLAN(S) FOR QTY. REQ'D. #3 TIES @ 16"O.G. 7� 4 #15GROUND cy) TILT ANGLE AS REQUIRED TO AIM CONDUIT J"O x 10'GROUN (8)-#5 BARS VERTICAL AT SPECIFIED POINT ON SITE. DRID��F4 I TL7f. IT 2'-0" 2" MIN. BETWEEN (ARRANGED SYMMETRICALLY CONDUITS POLE AROUND THE PERIMETER OF CONCRETE PIER) FLOODLIGHT MOUNTING DETAIL CONCRETE POLE BASE DETAIL UNDERGROUNI N.T.S. N.T.S. N.T.S. CAST IRON FRAME & COVER INSTALLED FLUSH WITH FINISHED GRADE LABEL STORM OR SANITARY SEWER C.O. AS APPLICABLE CLEAOR 3" R'ANCE LETTERING ON COVER CRUSHED STONE ASTM C33 LONG SWEEP 118 BEND 012 -1,116 SENDS LATERAL TO THE SEW INSTALL 12-GAUGE SOLID CORE TRACER WIRE WHEN USING SCREW PLUG IN POLYETHYLENE PIPE OF OTHER THREADED HUB NON TRACEABLE PIPE IS USED. —CONCRETE COLLAR OR PRECAST RING 2500 PSI MIN. 6" PVC SDR-35 RISER CRUSHED STONE LATERAL CONNECTION FROM THE BUILDING ki 11 1 �--L - I - ---�___j - I! I ) NOTE: THIS DETAIL APPLIES TO BOTH SANITARY AND STORM SEWERS SEWER CLEANOUT DETAIL N.T.S. SYMBOLS LEGEND REFER TO SURVEY FOR EXISTING CONDITION SYMBOLS LEGEND NEW POLE SIGN LOCATION G — C.O. —W NEW WATER LINE AND VALVE — — — SS--0 UGE, T NEW UNDERGROUND ELECTRIC & 4V TELEPHONE SERVICE WATER METER/RPBA BACKFLOW PREVENTOR ("I" INDICATES IRRIGATI NEW GAS LINE NEW SANITARY SEWER AND CLEANOUT NEW LIGHT POLE LOCATION BEFORE STARTING ANY BUILDING PAD GRADING AND PLUMBING WORK, THE CONTRACTOR SHALL FIELD VERIFY LOCATION, MATERIAL, CONDITION, ACCESSIBILITY (INCLUDING STATE HIGHWAY OR OTHER RIGHTS -OF -WAY) AND WORKABLE FLOW LINE ELEVATION OF THE EXISTING SANITARY SEWER SERVICE LINE OR MAIN. IF A WORKABLE FLOW LINE HAS NOT BEEN ESTABLISHED AT THE TIME OF FINAL SANITARY SEWER SERVICE CONNECTION, THEN THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL EXPENSES ASSOCIATED WITH THE INSTALLATION OF A NEW GRINDER PUMP SYSTEM TO MEET OWNER AND LOCAL REQUIREMENTS. SEWER SERVICE CROSS SECTION METER AND TELEP if 11 MIN. N.T.S. �4 )0, -.PROPOSED 1 "TYPE K COPPER SERVICE ENTRANC WATER SERVICE, MIN. 24" BURY DEPTH. SEE DETAIL 6/C4 INSTALL SEPARATE IRRIGATION HOT BOX LLI FINISHED GRADE WITH RPBA PER CITY STANDARDS AND SPECIFICATIONS. A SEPARATE IRRIGATION METER & PIT. METER TO BE INSTALLED STUB FOR FUTUR '0 O'ReNyAu BY CITY IRRIGATION 2 1001-Off x 7 B1 A /0 SELECTED BACKFILL. CLEAN 320W saFT = 7 GRAVEL UNDER PAVEMENT P W- --W OOR EL EVA Th B FLOOR ELEVA' CLEAN ROCK, SAND OR SOIL. SUCCEEDING SHE —COMPACTED 95% STANDARD ...... - - - - - - PROCTOR DENSITY W- 320 2 EXISTING METER & PIT. C4 C4 —2" MIN. BETWEEN CONDUITS CONNECT TO EXISTING WATER METE PIT AND INSTALL HOT BOX WITH RPBA PER CITY STANDARDS AND SPECIFICATIONS. CONTRACTOR TO STUB UP 1 CONDUIT 1'-0" ABOVE FINISHED GRADE AND ZIP TIE 4'-0" OF EXCESS WIRE TO THE CONDUIT. ELECTRICAL CONTRACTOR WILL 1 o0ow WIT MAKE THE FINAL ELECTRICAL CONNECTIONS INSIDE THE SIGN. SIGN DISCONNECT FURNISHEWNSTALLED BY SIGN COMTRACTOR. 1 2 CONSTRUCT 21 LF OF PROPOSED 6" DIP WATERMAIN. CONNECT TO EXISTING WITH TEE AND THRUST BLOCKING PER CITY OF EDMONDS STANDARD DETAILS & SPECIFICATIONS. SEE 2/C6 INSTALL HYDRANT ASSEMBLY 4'BEHIND BACK OF CURB. 4" STORZ ADAPTOR REQUIRED. INSTALL PER CITY OF EDMONDS STANDARD DETAIL E7.1 AND FFINISHED GRADE FINISHED GRADE STANDARD SPECIFICATIONS. SEE I/C6 CONNECTION OF PROPOSED 1.5" GAS SERVICE TO z EXISTING GAS MAIN, BY GAS COMPANY. 00 CONTRACTOR SHALL COORDINATE WITH GAS COMPANY AND PERFORM TRENCHING AND cli SELECTED BACKFILL. CLEAN -V BACKFILLING AS REQUIRED BY GAS COMPANY. GRAVEL UNDER PAVEMENT. PROPOSED GAS SERVICE TO BE INSTALLED PER GAS :z. COMPANY'S REQUIREMENTS AND SPECIFICATIONS. ............. . .... X ..... ... .. .... ...... ----,_COMPACTED SAND PER CITY OF < EDMONDS SPECIFICATIONS ... ------- -35 SEWER PIPE . ..... 6" SDR (IF INSTALLED UNDER PAVEMENT �PIPE ZONE BEDDING CONSISTING OF \�—FIRM, UNDISTURBED BASE WITH LESS THEN 2'OF COVER, PIPE 3/4" CRUSHED ROCK PER CITY OF PIPE—J THAT IS SMOOTHLY SHALL BE DUCTILE [RON) EDMONDS SPECIFICATIONS. SEE DETAIL 2/C6 GRADED AND FREE OF LARGE MATERIALS WATER LINE PIPE SANITARY SEWER PIPE INSTALLATION DETAIL INSTALLATION DETAIL r7 1 A 71�r` Ai N.T.S. N.T.S. �4 iMUI aw Vpr C4 C4 Gj C -J- k? �v V, D, ,,n ,,n C-I . . . ........... 7* oo PROPOSED GAS ME. ',,/-LOCATION RE INV. OF 4" DIA. SANITARY SEWER @ BLDG. ±388.00 48 LF 6" SDR 35 OR DUCTILE IRON I 'low N E @ 3% SLOPE AND MIN 2' BURY ............... G DEPTH. SEE 7/C4 THIS LINE 18 SHOWN PER SEWER AS -BUILT INV. ±386.56 C. P. PLANS, NOT FIELD VERIFIED. CONTRACTOR TO FIELD VERIFY ITS LOCATION AND INVERT PRIOR TO INSTALLATION. PLEASE NOTIFY ENGINEER IF DESIGN WILL NOT WORK FTRASHIRECYC4 PAD, INSTALL SANITARY SEV�ER CLEANOUT AT PROPERTY LINE PER CITY 0 EDMONq'S REQUIREMENTS. INVERT TO MATCH EXISTING. W INV. t385.12 -.00 J, b I, Ln N5 7- )40 PROJECTB 4ARjj LS . . . ......... .6 V TOP OF F GE 392.4 ... . ..... .... ..... ....... ...... . ... ........ . ..... ..... ..... ..... ...... ...... . ..... ..... ............ ..... ..... . . ..... ..... ... . ..... ... . ..... ...... ..... ..... . ... ..... VV ­*" ** -, A ... ..... ----- ...... . ............. ....... ..... ...... ..... ...... ............ . ...... ...... ..... ...... .............. . .. . ....... .... . ........... ...... . ..... .............. . . ..... ..... .... ..... .......... N62*59'27"W C) 113.2 4' ... . .. ..... ..... . r. ..... . ... ... ..... so PROPOSED 10'WIDE UTILITY EASEMENT )TU F pm so SITE UTILITY PLAN C4 SCALE' 1" 20' CONSULTANTS: CEI ENGINEERING, INC. 2277 WEST HIGHWAY 36, SUITE 200 ROSEVILLE, MN 55113 PHONE: 651-697-0800 FAX: 651-697-0804 CONTACT: ALAN CATCHPOOL SEAL: M. CHRISTOPHER ROGERS, P.E. 9-20-11 ...................................................... DATEISSUED 38600 REG. NO. SHEET TITLE: SITE UTILITY PLAN REVISIONS: Immmmm NO: ................ ............................................. DATE: ................. BY: 11, 11 ............. 1 F 2-11-11 ............... ............................................ CITY 2 ........... ............................................ 7-15-11 CITY 5 9-1-11 CITY ............... ....... 6 . . ................. . 9-20-11 CITY CITY OF PROJECT NO: 11-11,11,11111, ... . ...... —- DRAWN BY: DS C 4 SHEET 5 OF 10 26444 JTA cl c cl cl _c c LA 9 ZY) 9 zy) LO (D C14 C14 I Q) 0 0 0 V 1. SYMBOL TO BE PAINTED (HIGHWAY GRADE) 0 YELLOW PER ACCESSIBILITY STANDARDS, I`_ < UNLESS OTHERWISE REQUIRED BY ADA OR LOCAL REQUIREMENTS. U) co CD ul 04 12" 9 9 20" BOLLARD: STANDARD 4" DIAMETER STEEL PAINT O'REILLY GREEN. REFER TO EXTERIOR FINISH SCHEDULE. CONCRETE PAD OR SIDEWALK: REFER TO SITE DEVELOPMENT FOR LOCATION AND TYPE. CONCRETE FILL CONCRETE FOOTING jjll,��!��!�ljjq [cf� ITI, I I c A ri SIGNAGE: "HANDICAPPED PARKING" EQUAL TO "BEST" No. SS53. AT RIGHT HAND DISCHARGE LOCATION PROVIDE "VAN ACCESSIBLE" SIGNAGE EQUAL TO "BEST" No. SS57. ATTACH EA. SIGN TO BOLLARDS W/ GALV. MOUNTING BOLTS. 4'-0" X 1 1/2" DIAMETER GALVANIZED POLE SET INSIDE BOLLARD W/ CONCRETE. BOLLARD: REFER TO DETAIL 6/C5 9 6" HINGE: TYP. (2) STANLEY BB855 PHOSPHATE WITH NO HOLES ON ONE SIDE FOR 4" x 4" x 1/4" STEEL TUBE GROUT 'I DIAMETER'l FILLED & CAPED W/ CONCRETE, A PAINT O'REILLY GREEN. PLAN VIEW CITY INSPECTION REQUIRED ON FORM WORK PRIOR TO POUR 5-1/2' 1' R 1' BATTER 4 1'R 0.05 FT/FT 4. - < . 4 4 4 4 4, 4 18' STANDARD 24' ARTERIAL NOTES, 1, FORMS SHALL BE TRUE TO LINE AND GRADE AND SECURELY STAKED, 2. EXPANSION JOINTS SHALL BE PLACED ADJACENT TO CATCH BASINS, 3. EXPANSION JOINTS SHALL BE EVERY 10 FEET AND DUMMY (CONSTRUCTION) JOINTS EVERY 5 FEET. 4. EXPANSION JOINTS SHALL HAVE 1/2' TO 5/8' WIDE PREMOLDED JOINT FILLER. 5. CONCRETE SHALL BE CLASS 3- 300OPSI. 6. FINISH SHALL BE LIGHT BROOM, 7. CURB SHALL BE SPRAYED WITH CLEPR CURING COMPOUND OR SHALL BE COVERED AND I<EPT MOIST FOR 72 HOURS. 8. ALL SIDEWALKS POURED BEHIND CURB IN DRIVEWAY AREAS SHALL BE 6' THICK OYER 2' OF CSTC WITH SUBGRADE COMPACTED TO 95% MAXIMUM DENSITY, CL 6# 2'- 5/8' MINUS CSTC REVISIONS APPROVED BY STANDARD DETAIL DATE D. GE13ERT 4/27/05 STANDARD TYPE "A" CURMUTTER DETAIL D. GEBERT 4/2/07 1 DATE 7/24/01 SCALE NTS DWG NO. E2.8 L A ITI, 1100 1 GATE FRAME: 1-1/2"x 1-1/2"x 1/8" STEEL TUBE OR 2"x 2"y. 1/8" ANGLE W/ WELDED JOINTS. PAINT OREILLY GREEN. ATTACH HORZ. C.C.A. 2 X 4'S ON STEEL FRAME @ TOP & BOTTOM W/ 4" X 1/4" GALV. CARRIAGE BOLTS ON OUTSIDE TO RECEIVE FENCE FACE BOARD. BARREL EOLT: STANLEY HEAVY BARREL BOLT # CD1 084BB SCREW THROUGH WOOD & INTO METAL FRAME. 3/4" BENT STIL. BAR (2) V I.D. X 2" LONG STL. PIPE WELDED TO FRAME &ALIGNED FOR BENT BAR ON EACH GATE. REFER SITE DEVELOPMENT FOR TYPE AND LOCATION. GATES OPENING SHOULD BE PLACED AT CENTER LINE OF CONCRETE PAD L 1 1/2" X 1 1/2" X 1/8" X 4'-0" LONG WELDED TO GATE. 3/4" BENTSTL. BAR CITY INSPECTION REQUIRED ON FORM WORK PRIOR TO POUR ION JOINT 10, DUMMY JOINT 4 4 777-7 X 4 A4 A* V 44 A': % A.' 4 4.; .4 A 'A .4 A' ...l. A: A A .4 '. . 4A % .4 2' MIN, 10, O.C. 5' O,C SAW CUT ACP A MIN, OF 2' FROM EDGE OF PLAN GUTTER, FULL DEPTH 1/2' EXPANSION JOINT MATERIAL---\ 5' TO 10' 4 4 1 —.1123- 4 le "' - ' A 4. 4 j I—, L11--1 11-111- A' A !Tj pir, i— UNDISTURBED EARTH OR SECTION COMPACTED NATIVE MATERIAL 2' MIN, UNLESS OTHERWISE SPECIFIED SAW CUT BY ENGINEER IT 2"- 5/8" MINUS CSTC N 0 T E: 1. CONCRETE SHALL BE CLASS 3- 300OPSI 2. CONCRETE SHALL BE BROOM FINISHED 3. SIDEWALK THICKNESS SHALL BE 5-1/2#, 4. SIDEWALK THICKNESS AT DRIVEWAYS SHALL BE G'v THICK, 5. CURB AND GUTTER SHALL BE POURED SEPARATELY FROM SIDEWALK 6. CONCRETE SHALL BE SPRAYED WITH CLEAR CURING COMPOUND OR SHALL BE COVERED AND KEPT MOIST FOR 72 HOURS, 7. SAW CUT AND REMOVE ACP PAVEMENT A MIN, OF 2' FROM GUTTER FACE TO INSURE ADEQUATE COMPACTION OF ACP AND GUTTER SUBGRADE D. FC-1-TY' 0 '-T REVISIONS APPROvED 'ay DATE STANDARD DETAIL GEBERT 4/27/05 CONCRETE SIDEWALK D. GEBERT 04/2/07 DATE 7/24/01 SCALE NTS DWG NO. E2.13 N77'r NMA a I N- Inglarrolmll a CS SCALE:' 3/4" V-0" MAX - ALL FASTENERS TO BE GALVANIZE FINISHED 0 0 FRONT PROVIDE POST CAPS 1 "X6" CCA TREATED DOG EAR BOARDS ALTERNATE BOARDS ON OPPOSITE SIDES OF FENCE. 2" GALV. STEEL PIPE (SCHEDULE 40,13 GAGE) WITH SIMPSON STRONG -TIE PGT2 CONNECTORS FOR ATTACHING FENCE. MINIMUM OF 3 PGT2'S PER PIPE. 2"X4" C.C.A. HORIZONTAL RAIL (TYP.) MEMBERS THREE (3) PLACES. PROVIDE (2) 3/8" DIA. WEEP HOLES, TYP. CONCRETE FOOTING SET POLES IN DUMPSTER PAD. CONSULTANTS: CEI ENGINEERING, INC. 2277 WEST HIGHWAY 36, SUITE 200 ROSEVILLE, MIN 55113 PHONE: 651-697-0800 FAX: 651-697-0804 CONTACT: ALAN CATCHPOOL SEAL: M. CHRISTOPHER ROGERS, P.E. 9-1-11 DATEISSUED 38600 N0 - -- - - ---------- - - --- - - - U) C) < N Z 0 16 0 Cy) Lij on= 4 cy) ry co SHEET TITLE: SITE DETAILS REVISIONS: NO: DATE: BY: PROJECT NO: 26444 DRAWNBY: JTA ................ . ........ C 5 SHEET 6 OF 10 rail COPYRIGHT BRUCE M. CARLSON, AIA 2008 D N, 5 1/4' RAKE PER FOOT FROM GROUND LEVEL DOUBLE SIDED BLUE RAISED —MIN. 6' BEHIND BACK OF PAVEMENT MARKERS SIDEWALK _4' STORZ ADAPTER ALIGN VALUE BOX EARS TEE WITH FLANGED X PARALLEL WITH THE WATER CONNECTION FOR �2 W�zw "�\_LINE IT SERVES HYDRANT VALVE , TRAFFIC SAFETY FEATURE, - BREAK OFF FLANGE, NUTS - AND BOLTS, 3' x 3' x 3,5' THICK CONCRETE PAD AROUND HYDRANT 10 MIL PLASTIC BETWEEN BLOCK & HYDRANT IN INTERMEDIATE JOINTS TO BE RESTRAINED N 0 T E S 10 MIL PLASTIC BETWEEN BLOCK & TEE \CONCRETE BRICK 1. HYDRANTS AND ALL MATERIALS TO BE IN ACCORDANCE WITH CITY OF EDMONDS APPROVED MATERIAL LISTINGS. 2. HYDRANTS SET IN CONCRETE REQUIRES AN EXPANSION STRIP AROUND HYDRANT PROPERTY SHALL EQUAL OR EXCEED STANDARDS SET FORTH FOR THE INSTALLATION OF PUBLIC FIRE HYDRANTS IN THE CITY OF EDMONDS. 3. PROVIDE FOR VEHICULAR TRAFFIC PROTECTION. 4. ALL HYDRANTS SHALL BE PROVIDED WITH (2) 2-1/2' HOSE NOZZLES AND 9AR*EL�2'INSXDffi#TM, t�Lzzl�fs*LT-�A-ftbN6bPzrFffuWi(DWL-dNGpAPORTER. 5. STEAMER PORT SHALL FACE THE STREET OR ROADWAY FOR FIRE ENGINE ACCESS, 6. THREE FOOT MINIMUM CLEARANCE SHALL BE MAINTAINED AROUND HYDRANT WHEN PLACING LANDSCAPING OR ROCKERIES (ETC). 7. FIRE HYDRANTS SHALL BE PAINTED SAFETY YELLOW 8. CONSTRUCT 3' X 3' X 3.5' THICK CONCRETE PAD AROUND HYDRANT PIPE. FVIqIONS -0: TY: APPROVED BY DATE STANDARD DETAIL D. GEBERT 6/16/03 D. GEBERT 4/2/07 FIRE HYDRANT ASSEMBLY DATE SCALE DWG NO. 90 7/24/01 NTS E7.1 1890-19 FJ 4 Mn I Tj m V I UffY V!- I � P-31 F:_4 a I P 1, P;11 NM LE C6 SCALE: NOTTOSCALE FILTER FABRIC SECURED TO 2' X 2' 14 GA. WIRE FABRIC EQUAL 2' X 2' WOOD OR EQUIVALENT 8'- 12' PLACE 3/4'-1,5' WASHED GRAVEL IN THE TRENCH AND ON BOTH SIDES OF FILTER FABRIC FENCE ON THE SURFACE. C:) 0i FILTER FABRIC MATERIAL IN CONTINOUS ROLLS. USE STAPLES OR WIRE RINGS TO ATTACH FABRIC TO WIRE. WIRE MESH SUPPORT FE TO SUPPORT FILTER FA BURY BOTTOM OF FILTER MATERIAL 8' TO 12' 6' MAX, 2' X 2' WOOD POSTS OR EQUIVALENT CONTRACTOR/DEVELOPER SHALL MAINTAIN AND REPLACE STRAW BALES TO INSURE PROPER EROSION CONTROL. CITY INSPECTION REQUIRED ON ALL EROSION CONTROL METHODS BEFORE OTHER WORK CAN BEGIN. O.F N.''D .-C-1-TY. EOM''O''' REVISIONS APPROVED BY DATE STANDARD DETAIL FILTER FABRIC FENCE FILTRATION SYSTEMS 189C DATE 7/24/01 SCALE NTS DWG No' E1.1 FJI C6 SCALE: NOTTOSCALE LIMIT OF PIPE ZON- FOUNDATION LEVEL 1090-199V BEDDING MATERIAL REQUIRED PER CITY OF EDMONDS MODIFICATIONS DIVISION 9 OF WSDOT STANDARD CIFICATION FOR ROAD, BRIDGE IUNICIPAL CONSTRUCTION AND OF PIPE. iPIPE BASE N 0 T E S 1. PROVIDE UNIFORM SUPPORT UNDER BARREL 2. HAND TAMP UNDER HAUNCHES 3. COMPACT BEDDING MATERIAL TO 95% MAX. DENSITY TY" REVISIONS STANDARD DETAIL APPROVED BY DATE D. GEBERT 4/2/07 PIPE BEDDING DATE SCALE DWG NO. NTS E4.1 7/24/01 DWI C6 SCALE: 140T TO SCALE GRATE FILTER SOCK WITH OVER FLOW HOLES 4 A CATCH BASIN) 4: STRAW BALES MAY BE USED IN CERTAIN CIRCUMSTANCES (SEE DETAIL E111). THIS APPLICAITON SHALL BE MAINTAINED AT ALL TIMES DURING CONSTRUCITON PERIOD. CITY INSPECTION REQUIRED ON ALL EROSION CONTROLI MEASURES BEFORE WORK CAN BEGIN, C-ITY ..O.F REVISIONS STANDARD DETAIL APPROVED BY I - DATE D, GEBERT 10/06/03 D. GEBERT -05/19/05 TEMPORARY SEDIMENT TRAP FOR CATCH BASINS 1896 1990 D, GEBERT 05/05/06 DATE 7/24/01 SCALE NTS DWG E1.3 Dimensions shown on sample plan views are, Jkdsh ed inside dimensions. Typioal offset gate design has a minimum 3' opening. Front -load collection Typical onGlosuieshowing 2 side by side d4e.ct stab 4 ctibic yard or'greater containen ---------- -- T DCARRAGE RFCYCLE f DROP PIN METAL LINED HOLES. INSTALL AT GATES FULLY OPEN AND CLOSED POSITIONS TRUCK Overhead close-up view of gate support showing placeme in line with solid side wall -nt maximiziag clear gate opening 0 MUM"M IN M I F-4.0 VARIES PER CODE >_ RAIIUS VARIES < D�c > TYPE 2 CURB RAMP O� 6' LONG RAMP MIN. P (SEE DETAIL -2,15TI SIDEWALK u z A C3 U �PLACE I' WIDE TACTILE 0 1 1' BEHIND START OF RAMP NOTE., Offset gate deaign offers convenient. te=t aacess DP,,QPPIN CONCRETE CURB AND GUTTER OR 16' VERTICAL CURB (TO MATCH EXISTING CURBING) SHALL EXTEND TO END OF RADIUS, EXTRUDED CURB SHALL START AT END OF RADIUS TRANSITION SLOPE SHALL — BE 1112 (TYP) 3' LANDING (TYP) TYPE 2 CURB RAMP 6' LONG RAMP MIN, (SEE DETAIL E-2,14) T CONCRETE CURB AND GUTTER ZPLACE FULL DEPTH EXPANSION JOINT CONCRETE GUTTERJ BETWEEN C/G AND HIGH TRAFFIC LOAD GUTTER iT IF WING AND C/G ARE NOT POURED AS ONE LIN CURB/GUTTER AND WING FOR HIGH TRAFFIC LOAD GUTTER MAY BE POURED AS ONE UNIT, FULL DEPTH EXPANSION JOINTS SHALL BE PLACED 1' LIP IF WIDTH OF OPENING EXCEEDS 15', C NCRETE ACP zo 24' SECTION A ------ 9AAM V +6 CONCRETE SHALL BE CLASS 3- 300OPSI x NOTE, CITY ENGINEER SHALL DETERMINE APPLICABLE COMMERCIAL TYPE ENTRANCE BASED ON LOCATION & OTHER SITE CONDITIONS, CURB AND GUTTER SHALL BE PDURED SEPARATELY FRDM THE SIDEWALK, CONCRETE SURFAC CITY INSPECTIDN REQUIRED DN FDRM WERK PRIDR TE7 PDUR, 4TY E-0-1V -N C. REVISIONS STANDARD DETAIL APPROVED BY DATE MULTI -FAMILY/ COMMERCIAL HIGH TRAFFIC LOAD DRIVEWAY ACCESS D, GEDERT 10/6/03 (WITH CONCRETE DRIVEWAY APPROACH) D. GEBERT 06/27/05 DATE SCALE DWG NO. D. GERERT 04/2/07 7/24/01 NTS E2.27.1 C6 SCALE: NOT TO SCALE A MIN, RADIUS QUARRY SPALLS 2-4' MIN DIA 8'-12' MIN. DEPTH PROVIDE FULL WIDTH OF INGRESS/ EGRESS AREA CONTRACTOR SHALL MAINTAIN TEMPORARY CONSTRUCTION ENTRANCE DURING THE CONSTRUCTION PERIOD, ICITY INSPECTION REQUIRED ON ALL EROSION CONTROL MEASURES BEFORE WORK CAN BEGIN, TY E.-D REVIII IONS APPROVED BY DATE STANDARD DETAIL D. GEBERT 10/6/03 STABILIZED CONSTRUCTION ENTRANCE DATE 1890-19C30 — 7/24/01 1 SCALE NTS IDWG NO. E1.2 CLEAR SPACE BETWEEN END OF DOME TRANSITION POINT FROM SLOPE TO LANDING B-1 IT, DETECTABLE WARNING PATTERN (TRUNCATED DOMES) SEE DETAIL B 3' LANDING TYPICAL ON ALL RAMPS CURB RAM 2.5' LONG DETECTABLE WARNING PATTERN AREA ALL BE YELLOW, RAMP 4L CURB AT 1.12 AT 1,12 IN A M ST I L /2' PEIXCPAALN ATE ZILALI (TY )SIGN JOINT / TO 11�1/ Ex,,,sE!,?K SAW CUT AS REQUIRED LTPCTILE WARNING STRIP SEE DETAIL A WIDE (TYPICAL) I T Y F's. REFE Z TO DETAIL B ctoyw- R&�- v 1/2' _1A[ A 13 V 1 4' MIN. MAX. A A 1 5/8' 2 3/8' PL N NOMINAL DIMENSIONS B —5/8. _11/2' 4 11 -1 C C 7/16' 3/4' TRACTION D 7/8' 1 7/16' RID PATTERN - TACTILE WARNING TEXTURING ELEVATION 4.0 4 0,-, DETAIL A DETAIL B NOTE, MIVINV~ o� (PI 4-o ftw)vnvyq o-f 15 1. AT LOCATIONS WHERE NEW RAMPS ABUT EXISTING CURB, GUTTERS, PLANTER STRIPS, AND SIDEWALKS, PAte,�- CONSTRUCT NEW RAMPS TO MATCH ADJACENT SURFACES. 2. ALL CONCRETE SURFACES SHALL HAVE A LIGHT BROOM FINISH. s.-' 4/o smope 3. CONCRETE SHALL BE SPRAYED WITH A CLEAR CURING COMPOUND OR SHALL BE COVERED AND KEPT MOIST FOR 72 HOURS. DE CTABLE WARNING PATTERNS (TRUNCATED DOMES) SHALL BE REQUIRED ON ALL PUBLIC STREETS WITH A C RETURN AND PRIVATE STREETS SERVING FIVE OR MORE LOTS. TRACTION GRID <DIAMONDS) TO BE USED AS ICATED, N-INTERSECTION CURB RAMPS ON PRIVATE PROPERTY, THE STANDARD DIAMOND PATTERN MAY BE D INDICATED IN DETAIL A. CITY INSPECTION REQUIRED DN FDRM W17RK PRIDR TO POUR ACCESSIBLE RAMP SHALL BE PDURED SEPARATELY FRDM CURB AND GUTTER. TY OF'... REVISIONS STANDARD DETAIL APPROVED BY DATE D. GEBERT 03/24/05 CURB RAMP TYPE 2 D. GEBERT 06/27/05 DATE 1890-IC390 D. GEBERT 04/2/07 7/24/01 SCALE NTS DWG NO. E2.15 CONSULTANTS: CEI ENGINEERING, INC. 2277 WEST HIGHWAY 36, SUITE 200 ROSEVILLE, MIN 55113 PHONE: 651-697-0800 FAX: 651-697-0804 CONTACT: ALAN CATCHPOOL E X P I �Re �Sif= M. CHRISTOPHER ROGERS, P.E. 9-1-11 DATE ISSUED 38600 ........... ............... ........... 3�: V) V) < _17 I-- 0 v) 0 N Z 0 86 0� 0) 0 C== f"i't REVISIONS: DATE: BY: NO: PROJECT NO: ................ 111,11.11, ­­ _ ...................................................... 26444 ........... DRAWN BY: ................................ 1111.1111111". ......................... JTA .......... C6 SHEET 7 OF 10 COPYRIGHT BRUCE M. CARLSON, AIA 2008 Z SEE CONTRACT PLANS VARIES BROOMED SEE NOTE I FINISH MR) 3"R, (TYR) r cm.) DRIVEWAY CEMENT— CONCRE7rE CuFi� TAPER (IYP,) CEMENT CONCRETE & GUTTER (SEE NOTE M DRIVEWAY ENTRANCE PLAN VIEW J � SIDE SLOPE (TYP.) (t> CURB & GUTTER NOTES 4ii�j TYPE I (SEE NOTES) PLAN VIEW 1. When the driveway width exceeds 16 fW, con*uct a full depth IS MAX SEE NOTE 6 VARIES - SEE expansion joint with 3160 joint filler along the driveway oentarline. TYPE 2 GRADE gas Standard Plan F-30.10.0anabruct expansion joints� 1/2"MAX UP BETWEEN 13REAK GRADE BRW parallel Iwith the centerline as required at 15 feet maximum SEE CONTRACT PLANS SEE CONTRACT p ROADWAY GUTTER & CURB, .......... NOT STEEPER THAN 6.3S MM spacing when driveway widths exceed 30 ftt ................................. " . s OR SEE CONTRACT PLANS ROAD GRADE 2. See Stantlard Plan F-30.10 for sidewalk details� Itr R. (TYP,) MPRESSED CURB 2.0% MA GUTTER (SEE NOTE 3) 3. Curb and gutter shown, see the Contract Plans for the PED98TRAN RAMP PEDESTRIAN RAMP curb design Specified, See StandaW Plan F-10.12 f GRADE aV EXPANSION JOINT (TYP,) CEMENT CONCRETE BREAK SEE STANDARD PLAN P40.10 for Cuth Details. DRIVEWAY SIDDYALK (TYP.) SECTION (SEE NOTE 7) SIDFM ��OMVEWAY RAMP 4. Avoid placing drainage structures, junction boxes 30 EXPANSION JOINT VryP.).__,/ SECTION 1/2, MAX LIP BETWEEN or other obstructions in front of driveway entrances. - SEE STANDARD PLAN F-30.10 TRACT ROADWAY GUTTER 9 CURB 5, Where "GRADE BREA10 is called out ft anbre length of the SEE CON SEE CONTRACT OR SEE CONTRACT PLANS line between the two adjacent surface planes shall be flush. Irr R, PLANS PLANS r DEPRESSED CURB & GUTTER 6, The curb romp maxknurn running slope shall not require the SEE CONTRACT P,., (SEE NOTE 3) romp length to exceed 15 feet to void chasing the slope LEGEND 2,0% MAX. 6 . ; , , r � , !: ".. I'll 1, indefintt* when Connecting to staep grades, Men SLOPE IN EITHER DIRFCTION FEN applying the 16 foot max. length, the running slope DRIVEWAY RAMP t of the curb ramp shall be as flat as feasAle. WS"EXPANSION JOINT PP.) 7, Pay item does not Includa driveway. DRIVEWAY - SEE STANDARD PLAN F-"AD ,sEe NOTE 7) See Contract Plans. SECTION "CEMENT CONCRETE DRIVEWAY 'CEMENT CONCRETE DRIVEWAY ENTRANCE TYPE r PAY LIMITS ENTRANCETYPIE I" PAY LIMITS DIRNIEWAY DRIVEWAY CEMENT CONCRETE (SEE NOTE 7) (SEE NOTE 7) DRIVEWAY ENTRANCE TYPES Is 213 & 4 CL 4000 CONNORETE STANDARD PLAN F-80.10-01 PER STANDARD SPEC 9-4143 CL. 4000 CONCRETE PER STANDARD SPEC, 8-03 SHEET I OF 2 SHEETS 10� MAX Y LIMITS ,,JarOMETRIC VIEW TYPE 1 PAY LIMITS VARIES 12!'TO24IIi FACE OF CURB . ... . . ......... . ....... FACE OF CURB, VARIES 10" TO 2Z iE CONTRACT); C14 ROADMY SLOPE MATCH ROADWAY MAT E ROADWAY 1/2'R", ROAUMY SLOP Ir 1 11 . ........................... DUAL -FACED CEMENT CONCRETE TRAFFIC CURB AND GUTTER FACE OF CURB 5 IJ2' I" R- MATCH ROADWAY V2, R . ...... SLOPE ROADWAY 4, CEMENT CONCRETE TRAFFIC CURB AND GUTTER 1W R, CEMENT CONCRETE OR ASPHALT CONCRETE SIDEWALK OR PATH I., 3W PMOLDED JOINT FILLER (WIEN ADJACENT TO CEMENT CONCRETE SIDEWALK) CEMENT CONCRETE PEDESTRIAN CURB FACE OF CURB rA= Or CURB VWES 12"TO W: ................................... . i% VARIES R. I' R. .--\. 1 ROADWAY ROADWAY 13/4" DUAL -FACED CEMENT ONCRETE TRAFFIC CURB APPROVED FOR PUBLICATION Rasco filakcWch N 0&03-10 W. "", 1,­,,.j&dmETRic VIEW WaAlnwmn suft TYPE 2 PAY LIMITS FACE OF CURR 6 irx VARIES FROM W10 Cr. MAINTAIN 1H.6V SLOPE VARIES:� ON SIDE OF CURB MATCH ROADWAY SLOPE 112* R. / ROADWAY 96: W. R .. ........ W * .% 1. 6: ku <,> DEPRESSED CURB SECTION ATCURBRAMPSAND DIRNEWAY ENTRANCES CFMENT CONCRETE a, CURS RAMP, LANDING, Vr R. . .... . OR DRIVEWAY VAPJF-$ ENTRANCE FROVI To (r ... .......... 3/8* PREMOLD M JOINT rIULER. CEMENT CONCRETE PEDESTRIAN CURB AT CURB RAMPIS. LANDINGS, AND DRfMAY ENTRANCES FACE OF CURB 1W I" R. ROADWAY f LLL—S .......... CEMENT CONCRETE TRAFFIC CURB I ECK(# I FL� C7 SCALE: NOT TO SCALE w. C7 SCALE: NOTTOSCALIE NOTE 1. See Standard Plan F-30.10 for Curb Expansion and Contraction Joint spacing, -R PAN AT CURB FLUSH WTH OUTTE <1) RAMP ENTRANCE - la'VERTICAL LIP AT DRIVEWAY ENTRANCE FACE OF; CUR13 I 1Z R. 7 V41" ROADWAY f, A MOUNTABLE CEMENT CONCRETE TRAFFIC CURB ................ ­.. : X : ith'i 4 CEMENT CONCRETE CURBS -10.12-02 STANDARD PLAN IF SHEET I OF I SHEET ............. .......... APPROVED FOR PUBLICATION Pasco Bakiotich N 06-16-11: MATE VEMN VIMMER CATE. Alft .............................. ......... ........... ................ .......... VARIES EXPANSION JOINT (TYP.) BROOMFU 318 FINISH (TYP,) SEE CONTRACT' PLANS SEE STANDARD PLAN F-10.110 CEMENT 2.0% MAX. ------ - MATCH SIDEWALKWIDTH CONCRETE- 4? - (r MIN, SEE SIDEWALK MATCH SID CONTRACT PLANS 'r - IV, MIN. 7. si CONTRACT PLA'N3 .................. .................................... ----------------------------------------------------------- 7 ---------------------------------------------- -- C_ .. ..................... BUFFER STRIP (ryp.) SEE NOTE I PLAN VIEW 21 TYPE 3 9 -F Z U_ MATCH SIDEWALK WDTH TRAC SEECON T PLANS Ir7 R. (TYP.) .. . ....... . ...... SEE DRIVEWAY 4 Cr MIN, (SEE NOTE 7) .-2.D% MAX. . ........ . .... . SIDE, VALK DRIVEWAY XWEXPANSION JOINT (TYR) RAMP DEPRESSED SEE STANDARD PLAN F-MAD CURB & GUTTER ME NOTE 3 SECTION DRIVEWAY ICEMENT CONCRETE DRIVEWAY ENTRANCE TYPE T- PAY LIMIT DRIVEWAY ISOMETRIC VIEW TYPE 3 PAY LIMITS 11 W� 61 SIDEWALK- WMIN. 11. W (SEE CONTRACT) ROUNDING 12%1 1/2- R, (TYR) 2.0% MAY, 'Mot JOINT FILLER -0S SHEET DETAIL - TI Z. "" SEE RAISED EDGE _J 31tr PRI WITH RAISED EDGE Z-(r $IDEWALK - 6 - VMIN. MIR (SEE CONTRAC1) 11 a" 11 cr 1fr R, (TYP.) ROUNDING 2.0% 2APA MAX. 9 JOINT FILLER ADJACENTTO CURB (STEEP FILL SLOPES) 0. SIDEWALK- 6 - 0"MIN, All CUT . ........... $LOPESf- 1W R. (TYP,) ZMA MAX UP. �Wr W PREMOLDE JOINT FILLER ADJACENT TO CURB UJ LU J� i (M." M AX LIP BEIV&EN ROADWAY GUTTER & CURB, OR SEE CONTRACT PLAN$ ............ .................. .............. . ........ CEMENT CONCRETE CURB & GUTTER SEE NOTE 3 ORN'SNAY ENTRANCE SIDE SLOPE MP.) VARIES - a, - tr -------------- SEE CONTRACT PLANS 13ROMED 3V EXPANSION JOINT (TYR) SEE STANDARD PLAN F 0 FINISH (TYR) *CEMENT CONCRETE DRIVEWAY ENTRANCE TYPE 411 PAY LIMIT DRIVEWAY (SEE NOTE 7) CL 40M CONCRETME PER STANDARD 3PEM griNA'­ MvEWAy ENTRANCE SEE NOTE I CEMENT CONCRETE SIDE SLOPE (M.) CURB & GUTTER SEE NOTE 3 PLAN VIEW TYPE 4* *THIS ENTRANCE TYPE SHALL NOT BE USED ALONG A PEDESTRIAN ROUTE Ire R. (TYP.) - 1W MAX LIP BETWEEN ROADWAY GUTTER &CURB, OR SEE CONTRACT PLANS DRIVEWAY �Mrn NOTE 7) DRIVEWAY DEPRESSED RAMP SEMON CURB #I GUTTER SEE NOTE 3 ISOMETRIC VIEW TYPE4PAYLIMITS 0 of a Ak- OtSTI 0,14.k L CEMENT CONCRETE DRIVEWAY ENTRANCE TYPES 11121 3 & 4 STANDARD PLAN F-80.10-01 SHEET 2 OF 2 SHEET$ APPROVED FOR PUBLICATION Pasco Bakafth N 06-03-10 0 OWE MM101OW11111 11AT33 WalhinsftH SWO DWOOMMA of H(ikvja 9`1 UW �hog VU4 -5 FOR SIDE TREATMENT SIDEWALK C - U* MIN. SIM see 00 CONTRACTION 43 11W FACE OF CURB SEE OTHER SIDEWALK SECTI ON$ (SEE CONTRACT) JOINT irr R. (TYP.) CURB NOT INCLUDED IN 810 ITEM 2,09 i, MAX, SEE STANDARD PLAN F-110.12 - ----- ROADWAY SEE CURB FACE DETAIL 1 FINISHED GRADE 11' BELOW MONOLITHIC CEMENT CONCRETE --1 TOP Or- CONCRETE SURFACE C URS AND SIDEWALK NOTE NOTIE- Extend sidewalk trartmirse expansion 1. Four feet of the sidewalk width shall bathe minimum pedestrian accessible joints to include curb (full depth). CURB NOT INCLUDED IN SID ITEM mute, free of vertical and horizontal obstructions. Gratings, access covers, CURB FACE DETAIL SEE STANDARD PLAN F-110.112 F - junction boxes, cable vaults. pull boxes and other appurtenances within the sidewalk must have slip resistant surfaces and be ffush with surface and match grade of the sidewalk, WALL OR WRIER CURB NOT INCLUDED IN BID ITEM SEE STANDARD PLAN F-10.12 Irr R. 3W PREMOLDED JOINT rILLER SIDEWALK ADJACENT TO WALL DETAIL BRIDGE OR PEDESTRIAN RAILJNG SIDEWALK-6I - 0'MIN, i - --?- I I (SLa CONTRACI) BARRIER W DNTRACT lr�- R, oyp') (SEE CA PLANS) FWSH CURB NOT INCLUDED IN 810 ITEM 2MA MAX 0.12 SEE STANDARD PLAN F4 VERTICALWALL 71 PREMO�E, JOINT FILLER ��P.) SEE DETXL � F�L ADJACENT TO CURB AND RAtUNG OR WALL NOTE,. EXTEND SIDEWALK TRANSVERSE MOE JOINTS TO INCLUDE RAISED F T- XMIN. DR ME TREATMENT 51DEVMK 5- Q'MIN, BUFFER STRIP RAISED EDGE DETAIL fE CTHER SIDEWALK SEE CONTRACT) Er- CONTRAcTi NS SECTIO 112'R. (TYP.) CURB NOT INCLUDED IN BID ITEM SEESTAND O�M -10,12 AX ARD PLAN F FINISHED GRADS 11 BELOW TOP OF CONCRETE SURFACE FOR PLANTING FLUSH IF PAVED PREMOLDED JOINT FILLER ADJACENT TO BUFFER STRIP EXPANSION JOINT C7 SCALE: NOT TO SCALE IRB OWN) IV TO 114' CEMENT CONCRETE SIDEWALK -30.10-01 STANDARD PLAN IF SHEET I OF I SHEET APPROVED FOR PUBLICATION P"co filakofth 111 065-03-10 VATT. washineftff at CONTRACTION JOINT A CONSULTANTS: CEI ENGINEERING, INC. 2277 WEST HIGHWAY 36, SUITE 200 ROSEVILLE, MIN 55113 PHONE: 651-697-0800 FAX: 651-697-0804 CONTACT: ALAN CATCHPOOL SEAL: M. CHRISTOPHER ROGERS, P.E. 9-1-11 DATE ISSUED 38600 N0 ...................... V) 0 V) < F V) 0 C�3 :2 0 Now= (7) LJIJ ry 91- SHEET TITLE: SITE DETAILS REVISIONS: NO: DATE: BY: 2 . .. ...... . .... 5 9 CITY SEP Oil DUILDING DEPAnTMENT nor ws PROJECT NO: 26444 ......................... ... ...................................................................................... DRAWN BY: JTA ................................ ................ .................. ­­­ ............ 5 C 7 SHEET 8 OF 10 COPYRIGHT BRUCE M. CARLSON, AIA 2008 0) LO 0) ry 1__� .C: 0 C� .,I- 14- -It (0 N 1-11 0 0 0 rD Z_ 0- 01N CIO I 0 171 lAn I FILTER CARTRIDGES NOT SHOWN IN THIS VIEW TO SHOW INLET INVERT, InternatsO 48 Manhote components --- I ,A- Jbb Floor SK-0567 Bypass . itt NOTE, Treatment Ftow Rate 1. MAXIMUM WEIGHT = 6561, (ASSEMBLED WITH CARTRIDGES), 20.4 gpm / 0,045 cf s P01 I N/A ]IEW�_ ]I/A- Mv. IEM 0 JOB DETAIL erk Filterf 0 48' Manhote APPROVALS DATE 18' Cartridges, 2 Each 360 &A -ton Place, Santa Ro% CA 95407 WON Mv MMnM% rw M.24.WX awktim" Customer: CEI Engineerlin JMcKintey 09/01/11 SIZE DRAWIN6 NO. REV. J, Hardesty 09/01/11 PDD-39 14 POI Job Name: DRei[ly A ut o �Iarts- of= ��_F — PRIM DOW SCALE, NONE Edmonds,WA J, Hardestv 09/01/11 DO NOT SCALE DRAWING SHEET I OF I 4 It" 1001; Ili FAI I SCALE: NOT TO SCALE POLYPROPYLENE STEPS OR LADDER PER WSDOT OR APPROVED EQUAL 8" SID 'vo RESTRICTOR N. 8" PVC PLAN VIEW TOP 389.0 POLYPROPYLENE STEPS OR LAUUtN N O.F. EL. 385.45—:.-arL2�M1 5' RESTRICTOR TEE 9' REMOVABLE PLUG INV. 378.00 — TYPE 1—LCB 8�' PVC Z REMOVABLE PLUG 1" VENT HOLE-- 8" PVC FACTORY TEE 6' PVC PVC PIPE c,0 GROUT 6' PVC PIPE 136" CMP /TO/FROM / TANK 54" DIA., TYPE 2 CATCH BASIN 4 NOTES: 1 ) CALL ENGINEERING DIVISION (771-0220 EXT. 1326) 24 HOURS IN ADVANCE FOR A TIGHT —LINE AND DETENTION SYSTEM INSPECTION BEFORE BACKFILLING AND FOR FINAL INSPECTIONS. 2) RESPONSIBILITY FOR OPERATION AND MAINTENANCE OF DRAINAGE SYSTEM ON PRIVATE PROPERTY IS THE RESPONSIBILITY OF THE PROPERTY OWNER. MATERIAL ACCUMULATED IN THE STORAGE PIPE MUST BE FLUSHED OUT AND REMOVED FROM CATCH BASINS TO ALLOW PROPER OPERATION. THE OUTLET CONTROL ORIFICE MUST BE KEPT OPEN AT ALL TIMES. 3) FOOTING DRAINS SHALL NOT CONNECT TO THE DETENTION SYSTEM. . 385.45 67 ELBOW I ELEV. 383.05 7/8" ORIFICE ELEV. 378.00 CUT HOLE 7/6' DIA. HOLE TO BE SHARP —EDGED, SHOP DRILLED. RESTRICTOR TEE PRE —CAST 60" DIA. TOP SLAB 8" INTAKE PIPE INV = 387.62 POLYPROPYLENE - STEPS OR LADDER PER WSDOT OR APPROVED EQUAL TOP 391.5 ,36' CMP DESIGN: COLLECTION AREA: IMPERVIOUS = 0.688 AC PERVIOUS = 0.329 AC PIPE DIAMETER = 96" PIPE LENGTH = 70 FT ORIFICE 1 = 7/8" AT 378.00 ORIFICE 2 = 7/8" AT 383.05 OVERFLOW = 385.45 SCALE: NOT TO SCALE INV. EL. 377.86 BRUCE M. CARLSON architecture - planning - interior design CONSULTANTS: CEI ENGINEERING, INC. 2277 WEST HIGHWAY 36, SUITE 200 ROSEVILLE, IVIN 55113 PHONE: 651-697-0800 FAX: 651-697-0804 CONTACT: ALAN CATCHPOOL LSA ENGINEERING, INC. 19217 36TH AVE W, SUITE 106 LYNNWOOD, WA 98036 PHONE: 425-775-1591 CONTACT: ROBERT LONG, PE M. CHRISTOPHER ROGERS, P.E. 9-20-11 i§§G*ff6*­* """ ......................................... 38600 �ffd:­N(5_._____'__'_­__' U) V) I-- C) 0 < 0 NZ 0 8d 7_. CY) Ld aim SHEET TITLE: SITE DETAILS REVISIONS: N 0: DATE: BY: 2 __ ".., 7-15-11 . . . . . ......... . CITY ............ . . . . ............. . ....... 5 9-1-11 CITY 6 9-20-11 CITY F_ � CITY OF PROJECT NO: 26444 . . ............ . . __ ........................... . . . ...... . .. . .. . ........ DRAWN BY: SHEET 9 OF 10 a- COPYRIGHT BRUCE M. CARLSON, AIA 2008 _7 �j In A. CONTRACTOR TO UTILIZE APPROVED STATE/FEDERAL DOT + 0 N I SIGNAGE PER THE CURRENT MUTCD. C"I 52 k. B . CONTRACTOR TO COORDINATE ALL WORK WITHIN THE :-3 ROADWAY WITH APPROPRIATE STATE/COUNTY/CITY ENTITIES. LU 0 00 0: C . CONTRACTOR TO FIELD ADJUST LOCATIONS OF TRAFFIC 0 Z:� P Uj BARRELS TO ACCOMMODATE THE LOCATIONS OF DRIVEWAYS 9 W d _St_ X 0�,� 0 " CL - : -4 AND ROADS. 0 Auto Q'Rei 41 0 C) .0 0 cj� 0 100'0*X75'0' D. WORK WITHIN ROADWAY SHALL BE COMPLETED DURING LOW T sa Fr = 7,60 11z TRAFFIC TIMES BETWEEN THE HOURS OF 8:00 AM -2:00 P.M. 0 ELEVATION., FLOOR ELEVATION ON I E. FLASHING BEACONS SHALL BE UTILIZED AT EACH BARREL UCCEEDING SHEETS., 100. DELINEATING AT TAPER AND EVERY THIRD BARREL WITH IN THE WORK ZONE. 01 00 F. ALL CONSTRUCTION VEHICLES SHALL ENTER AND EXIT SITE O'k 1 1 4) 00 FROM HIGHWAY 99 ENTRANCE. 00 R D G. WORK WITHIN HIGHWAY 99 AND 230th SHOULD BE 00 ADJACENT PROPERTIES C== ARE NOT SIMULTANEOUSLY SHUT DOWN SIDEWA CLOSED 4" F7 N/ I r/z u) j NO 2.0 -.6 u jwi4 0 36" X Y [!RASWREdYCLt PAD 5-54'18 v7 -tu VV 10 TACO r rr=1 - cl t ............ W, ..... ...... ... — . . . . ................ . . . ..... .... . . .... ...... . — ...... ..... < ET. ;:: `L\ < I-V .......... P UY 1 0 N62-59'27-W 0113.24! 0 ..... ..... Ld fy- 04 SIN%iU, 0 CONC�Fd.`T_` '16N 0 0 cp _ z < U) < 0 o'. LLJ 6. Tj :D Cn 0) 0 --d- I It T 0) C� CN 0 0 (o IN Es < 0 0 0 z LO I­ 0 r') V) 3: ry 0 0 00 C� V < CL C) < �1- 0 V11 0 ,t 0 Lr) r_.� 0 P �R D EE N - I N OV' LS op N' CS� ARRE A DJACENT T N �ANCE DRIVES TYP.�7 �AFFI( (TYP.) \PLACE AT 234th ST r INTERSECTION I HUM 99 TRAF PINk.v+ -Dr:::-Mof, RNOVrE5 CS SCALE: I" = 3W WIPA&C-honal M am CL6 RAq�l� VIZA A-dO -1—. ,q O'� WORK AREA MCI I 1= TRAFFIC CONTROL SIG N TYPE 3 BARRICADE A-T tII if I vi A-7 $V 0 S,3 r ROAD CLOSED R11-2 B/W 48" X 24" UK 0 Ln r ........... e*: DAD Vr- CLOSED AHEAD W20 -3 0 6" X 36" lj�vjpj qcr i nja-5 It AX 01 &O'c2(v- 0-k ts TYPE 3 BARRICADE sit, A 0 13 T\j - fa, SIDEWALK V, CLOSED W, C\j 36" KeVT S C=== . .......... (N P 5? 100'-- J E ILU Fn i �=Tnl'lp Z; En W Ci 0 C> C� 0 . . .... 17-77 vx,/ M5­11R 0 OOR iLFET� 17 .1 00 4r_VV1111't CFLOORELEVA177i);IN ON 2 1230th ST TRAFFIC CONTROL SCALE: 1" 3& '28 -----------­---- - SIGN SPACING = X (1) RURAL ROAD$ 45 fW MPH SW RURAL ROADS & UROM ARTERIAL$ 35140 MPH 35W t ............. .............. ................................... . ................. ............................. ....... . . . ............... LONGITUDINAL BUFFER SPACE a NOTES RURAL RCIMS. URBAN ARTERIALS, �6 f $0 MPH 20V * (2) POSTED It RESIDSMAL & BUSINESS DISMIM I. A Protective Vehicle is recoMMentled regartleSs if a Track 911Wrn 0 42 as: 570 UR13AN SUMETS 25MPHORLM 101*(2) MountW Albenuator (TMA) is available; a work vehicle M BUFFER DATA TYP=LPR0T9CMWVr;HICLAWFfHTMA (SEE NOTE I) VEHICIA! T"a LCADWWrMT 4 YARD DUMPTRUCK MIMMUM MuHr Ism Lai,__ SERVICE TRUCK SHALLBE =0'200=8TIN M A N U � FLAT BED, ETC, FACTURER R9COMMENDATION) - . .................................... ........................................ q .................................. ROLLAMEAD STOPPING DISTANCE = 3D FEET MIM PRY PAVEMENT ASSUMED) be usecl. When vo TMA Is ul;ed, the Protective Vehicle ALL SIGNS ARE BLACK ON ORANM UNLESS DESIGNATED 07HERWM shall be strategically located to shield workers, with no . .................. spedflo Roll�Meacl distance. (1) ALL SIGN SPACING MAY BE AWUSTED TO ACCOMMODATE 2. Devices shall not en=ach Into atilacent lanes, AT4RADE INTERSECTIONS AND DIRWEVAYS. 0204A on ........... (2) 1HISSIGN! SPACING MAY BE REDUCED IN URBAN AREASTO FIT 0OVV!NSTREAM TAPER amended. 3, Extend device taper (U3) aaM Shoulder` - mm, ROADWAY CONDITIONS. TO SHOW END OF VWRK AREA - SEE NOTE 7 4. Portable Changeable Message Sign (PCMS) recommended. MIN 5, Use Tlrartavorse Devices In dosed term every 10W;t RECOMMEND CLOSING ADJACENT Dmol MAIN LANE TO MAINTAIN SUPPER SPACe "j. remmmanded, SEE STANDARD PLAN K-24.20 FOR ALTERNATE ENCROACHMENT 6. Traft Safay Drums for all tapers on high speed roadway M4-8 . . .......... .. ...... ..... recommended. T. ChannelIzing Device spacing for the downstrearn taper !Z� . . .......... ... ........ option shall be 2V O.C. 8. For signs size retbir to Manua) on Unffbrm Tmfflc Control Devices (MUTOD) and WWOT Sign Fabrication Manual SIGN SPACING X (1) RU RAL HIGHWAYS .. . . . ......... . . ..................... W 165 MPH . . . . ..... . . ........ W4-2L COMPLIANCE DATE 12123113 RURAL ROADS 48 t SS MPH SW t .................... ................................................................................................................................................................ RURAL ROADS A URPAN ARTE.RIALS 35140 MPH W ...................................... .......................................................... ....................................... ........................ ............ ......... RESIDENTIAL & BUSINESS DISTRICTS 25130 WH 2W 1 (2) .............................................................................................................................. x: URM STREETS 26 MPH OR LESS ....... ... . . .......... ......... ALL SIGNS ARE BLACK ON ORAME UNLESS DESIGNATED OTHEM%SE ...... .... .. ...... ........... ... (1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODA1 E INTERCHANGE i 0. RAMPS, AT -GRADE INTERS TIONS. AND ORWEMYS. RMHT SIDEWALK CLOSED _r USE OTHER SIDE I 36" X 36" a, LEGEND N SIGN LOCATION K-. C BARRICADE -TYPE 3 A X, 1111-2 SW ,�Z;i BARRICADE -TYPE 31. ROAD I W:ILLS CLOSED 3z 3z CLOSM Sz . . . . . SIM AHVW X! z flun R114 SNV MV Sz X CLOSED ............................... P9 ROAD CLOSED ROAD CLOSM AHEAD ............ xxfAl MFAD OR I M LOWRAFFIC ONLY: ......... .. ...................... . .... NK-10L . .................. ................. . .... . ........................... J TWOLIVIES NOTES (2� THIS SIGN SPACING MX( BE REWMD IN URBAN ARE" TO FIT A ROADMY CONDITION$. CLOSED ARMWO 1. Modify Regulatory Traft Control Devices, as needed, for the X duration of the detour, ... . ........ . . - v.. ... ..... CHANNELIZING DEVICE SPACING PCMS 2. 7Wo Flaahing Vftrnlng Lights (Type A per MUTCD) may be used to SAMPLE MESSAGE mark each barricade at night — --------- ........... POSTED WEED I IN TAPER IN TAN13ENT 0 IAMWO 1 2 (MPH) (FEED (FEn ....................... WORK 3. Trail elazem shall be Installed throughout the detour, as appropriate. ONE AD 2LANE MILE .......... . ........ - ........... ... ....... AHEAD 40145 CLOSED ............... AHEAD 4. Signing shown for the one direction only. ............... ................... i's SEC 1�5 $PC I 5, Coordinate wIth emergency sawlom. ... .. . .......... FIELD LOCATE IN ADVANCE LEGEND OF LANE CLOSURE SIGNING s. ror signs size refer to Manual on Uniform Traffic Control Devices (MUTCD) and WSDOT Sign Fabricatton Manual M65-05. SIGN LOCAPON ..................... .................. % . ........................................................... ................................................................................................. S7 .... ....................... .............. ......................................... H 3, DETOUR ............. .. ....... . M3.1 MAIN sT. 03-101 ­0MUR M" X............ UR .... ............. . .............................................. AHEAD X' '0-3 <ROAD CLOSr '1\MEA10) A 4�2?k, BRUCE M. 1!F CARLSON architecture - planning - interior design BRUCE M. CARLSON, ARCHITECT 219 N. 2ND ST., SUITE 301 MINNEAPOLIS , MN 55401 PHONE: (612) 338-6677 FAX: (612) 338-2995 E—MAIL: info@cmarch.com CONTACT: JESSICA IVERSON jiverson@cmarch.com CONSULTANTS: CEI ENGINEERING, INC. 2277 WEST HIGHWAY 36, SUITE 200 ROSEVILLE, IVIN 55113 PHONE: 651-697-0800 FAX: 651-697-0804 CONTACT: ALAN CATCHPOOL SEAL: - s _Kw__ M. CHRISTOPHER ROGERS, P.E. 9-1-11 6_kfff _ISSLTE5__­_______ 38600 < &M 0 _17 C4 F_ � 0 V) 77 0 Od :2 r') mln� BMW= CY) LLJ Em CY) ry (A SHEET TITLE: TRAFFIC CONTROL PLAN REVISIONS: NO: DATE: BY: PROJECTNO: 26444 DRAWN BY: JTA C AO%L ff IL 5 SHEET 10 OF 10 n COPYRIGHT BRUCE M. CARLSON, AIA 2008 0 1w U DO 1-mllf"LTIEZ11 C 0 1 v w, 91 M" N, m4b Irm'm �'3 O�'� 5* 1&0& "o IP A%a - 1\ PARKING SPACES RE0,M_ PARKING SR,10ES PROPOSEU., BARRIER FIREE PARKING SPACES:, A. REFER TO PROJECT MANUAL FOR ADDITIONAL REQUIREMENTS. B. SITE CONDITIONS BASED UPON SURVEY PROVIDED BY* OWNER. CONTRACTOR TO FIELD VERIFY MSTING CONDITIONS BY DETAILED INSPECTION PRIOR TO SUBMITTING BID AND BEGINNING CONSTRUCTION. C. REFER TO CIVIL DRAWINGS FOR ADDITIONAL REQUIREMENTS. D. ALL PLANTING TYPES SHALL COMPLY WITH LOCAL GOVERNING CODES�AND REGULATIONS, CONFORM TO REQUIREMENTS OF PLANT LIST AND TO THE AMERICAN ASSOCIATION OF NURSERYMEN "AMERICAN STANDARD OF NURSERY STOCK"AND "HORTICULTURAL STANDARDS"AS TO SPECIES, AGE, SIZE, AND PLANTING RECOMMENDATIONS. E. NO MATERIAL SUBSTITUTIONS SHALL BE MADE WITHOUT THE OWNERS'S PRIOR WRITTEN APPROVAL. ALTERNATE MATERIALS OF SIMILAR SIZE AND CHARACTER MAY BE CONSIDERED IF SPECIFIED PLANT MATERIALS CANNOT BE OBTAINED, F. PLANT LOCATIONS ARE APPROXIMATE. ADJUST AS NECESSARY TO AVOID CONFLICTS. DO NOT PLANT TREES OVER OR WITHIN 8'OF UNDERGROUND UTILITIES. G. QUANTITIES OF MATERIALS SHOWN ON LANDSCAPING PLAN TAKE PRECEDENCE OVER QUANTITIES SHOWN ON PLANTING SCHEDULE. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING ALL QUANTITIES ON LANDSCAPING PLAN. H. ROCKHOUND, GRADE AND PROME 4- TOPSOIL AT ALL SOD, SEED AND PLANTING AREAS. GRADE SHALL BE ADJUSTED FOR SOD THICKNESS. 1. WHEN CLAY SOIL IS ENCOUNTERED IN THE ESTABLISHMENT OF THE LAWN OR THE INSTALLATION OF PLANT MATERIAL IT SHALL BE IMPROVED IN ACCORDANCE WITH STANDARD TRADE PRACTICE AND THE PROJECT SPECIFICATIONS. J. RE-ESTABLISH TURF IN AREAS DISTURBED BY GRADING OR UTILITY TRENCHING IN THE RIGHT-OF-WAY. K. COORDINATE WORK WITH OTHER SITE RELATED DEVELOPMENT DRAWINGS. L. ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL HILLSDALE COUNTY STANDARDS AND SPECIFICATIONS. M. ALL DISTURBED PERVIOUS SURFACE AREAS WHICH ARE TO REMAIN PERVIOUS SHALL RESTORE SOIL QUALITY AND DEPTH BY AMMENDING/COMPOSTING SOILS (PER D.O.E. BMP T5.13). LANDSCAPE SYMBOLS LEGEND REFER TO SURVEY FOR EXISTING CONDITION SYMBOLS LEGEND NEW BUILDING CONSTRUCTION AREA OF CONCRETE NEW POLE SIGN LOCATION NEW CONCRETE PAVING BLOCK NEW LIGHT POLE LOCATION .......... .......... ............. AREA OF MULCH AREA OF SOD LAWN AREA WHICH EXCEEDS 25% . . ... . SLOPE TO BE PROVIDED WITH SOD. REFER TO GRADING PLAN NEW TREE REFER TO PLANTING SCHEDULE FOR SIZE AND TYPE NEW SHRUB REFER TO PLANTING LEGEND FOR SIZE AND TYPE 0 "T"'TET FILE N BRUCE M. CARLSON architecture - plannirg - Interiordesign BRUCE M. CARLSONs ARCHITECT 219, N. 2ND ST., SUITE 301 MINNEAPOUSe MN 55401 PHONE: (612) 3,38-6677 FAX: (612) 338-2995 E—MAILe fnfo0cmarch.com CONTACT: JESSICA IVERSON livemon0cmarch.com rl",11 I I lilt CONSULTANTS: CEI ENGINEERING, INC. 2277 WEST HIGHWAY 36, SUITE 200 ROSEVILLE, MN 55113 PHONE: 651-697-0800 FAX: 651-697-0804 ASTo INC. 5001 AMERICAN BLVD W, SUITE 800 BLOOMINGTON, MN 554,37 PHONE: 952-854-9302 FAX: 952-854-9690 DUNHAM ASSOCIATESo INC 50 SOUIH SIX-fH ST, SUITE 1100 MINNEAPOLIS, hIN 55402 PHONE: 612-465-7550 FAX: 612-465--7551 SEAL: 5449 R, iF G I S T �-_- �1` r-E D r -CT T A C H! T EC T B CEIld C, ON OF ft T%l BRUCE M. CARLSON,. ARCHITECT 6W 13-2113-110 SHEET TITLE: LANDSCAPE PLANTING PLAN ROJECT NO: 10120.007 )RAWN BY: . . . ........ . .. L I SHEET 'I OF 3. I w L2 I SCALE: 3/4" = 1'-0" --e" e" -.Sao-- LM j1A.1 Me IGO A I Q P (Ce i I I DaT I [Of I Lt hTiNal E41UPWA-VA114110m L2 I SCALE. 3/4' =I '-0' MULCH LANDSCAPE FABRId L2 I SCALE: 3/4" = I' -Om L 't - I I zr -r*.-% 1-11 -fill- SMALL SHRUB PLANTING L2 j SCALE: 3/4" = 1'-0" ui ul LL 0 LLJ Le MCI a L2 I SCALE: 3/4' = 1'.0' � u-k uo r i A. REFER TO PROJECT MANUAL FOR ADDITIONAL REQUIREMENTS. B. COORDINATE WORK WITH OTHER SITE RELATED DEVELOPMENT DRAWINGS. PLANTING: REFER TO PLANTING SCHEDULE FOR TYPE SET TREE LEVEL AND PLUM. STRAIGHTEN AFTER SETTLEMENT IF NEEDED. ENCASE WIRE AROUND TRUNK IN BLACK RUBBER. MOVE UP ABOVE OR EQUAL TO 1/2 TO 1/3 OF THE HEIGHT OF TREE. SET TREE WITH TOP 1/3 OF ROOT ABOVE FINISH GRADE. REFER TO LANDSCAPE PLAN FOR GROUND COVER TYPE AND LOCATIONS. PROVIDE 3" DEEP 5/8"CREEK GRAVEL OVER BLACK VISQUEEN VAPOR BARRIER OR 3" DEEP SHREDDED CYPRESS MULCH OVER BLACK VISQUEEN VAPOR BARRIER. LAWN PLACE THREE PINS EVERY Z-O", SPACING EQUALLY. SOD SHALL BE COMPOSED OF TWO VARIETIES MINIMUM OF FESCUE GRASS. 3" DEEP, 518' CREEK GRAVEL OVER BLACK VISQUEEN VAPOR BARRIER. 4" BLACK POLYVINYL EDGING NOT APPLICABLE COMPACTED PLANTING SUB GRADE TWO STRANDS OF WIRE TRUNK WRAP 2" X 2"X 20"WOOD STAKES BURY BELOW FINISH GRADE. STAKES MUST BE INSTALLED OUTSIDE THE OF THE PREPARED PLANTING MIXTURE&ND EXTENTS OF PLANTING BERM TO HOLD WATER PREPARED PLANTING MIXTURE. TREES GREATER THAN 6'-0" IN HEIGHT SHALL BE STAKED AS INDICATED IN��BELOW. EXTENTS OF PLANTING BERM TO HOLD WATER. TREES BETWEEN 3'-0" AND 6'-0" IN HEIGHT MUST BE TIED AND STAKED AS INDICATED IN8ABOVE OR��BELOW. 2" X 4" STAKE - OR - METAL FENCE POST (48" OR 60' STEEL U-POSTS) 1"X 4"X 1 O"WHITE WOOD FLAG. 3" DEEP SHREDDED CYPRESS MULCH OVER BLACK VISQUEEN VAPOR BARRIER. R E c F I VF_c) SEP 0 9UILDINc OF CONSULTANTS: CEI ENGINEERING, INC. 2277 WEST HIGHWAY 36, SUITE 200 ROSEVILLE, MN 55113 PHONE: 651-697-0800 FAX: 651-697-0804 AST, INC. 5001 AMERICAN BLVD W, SUITE 800 BLOOMINGTON, MN 55437 PHONE: 952-854-9302 FAX: 952-854-9690 DUNHAM ASSOCIATES, INC 50 SOUTH SIXTH ST, SUITE 1100 MINNEAPOLIS, MN 55402 PHONE: 612-465-7550 FAX: 612-465-7551 Emmmmmmmmom — SEAL: 5449 REGISTER STATE OF WASHINGTON BRUCE M. CARLSON, ARCHITECT B-26-10 ...... . .............. 5449 SHEET TITLE: LANDSCAPE DETAILS REVISIONS: NO: DATE: BY: PROJECT NO: 10120.007 I-- .................... I ........................ 1. .............................. DRAWN BY. JLI .................... ........................... I ................... L2 SHEET 2 OF 3 :2 0- P0 04 04 0 U) Q i Z4, t I a m 0 1 L3 I SCALE: I " = 20' 11 \� A\?, TO - fV. OA A. REFER TO PROJECT MANUAL FOR ADDITIONAL REQUIREMENTS. B. COORDINATE WORK WITH OTHER SITE RELATED DEVELOPMENT DRAWINGS. C. ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL LANCASTER COUNTY STANDARDS AND SPECIFICATIONS. " � $ n 1. " FA 1w, ."v! tUT _p I'll I I 19krik-11,11114! 1. IRRIGATION HEADS SHALL BE PLACED TO PROVIDE 100% OVERLAP HEAD -TO -HEAD COVERAGE, AS SHOWN. 2. A RAIN SENSOR AND ANTI -FREEZE ASSEMBLY SHALL BE INSTALLED ON THE IRRIGATION SYSTEM. 3. THE IRRIGATION CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING A COMPLETE AND OPERABLE SYSTEM FOR THE IRRIGATION OF ALL LANDSCAPE PLANTING(S) AND DESIRED COVERAGE AREAS ON SITE. THIS SHALL INCLUDE, BUT NOT BE LIMITED TO, A PROPERLY SIZED REMOTE SYSTEM IRRIGATION CONTROLLER, BACKFLOW PREVENTOR OR DOUBLE CHECK VALVE (AS REQUESTED), PROPERLY SIZED AND TIMED ZONE DESIGN, RAIN SENSOR GUAGE, VALVES, PIPING, HEADS, ETC. 4. THE IRRIGATION CONTRACTOR IS FULLY RESPONSIBLE FOR THE WORK UNTIL OWNER GIVES FINAL ACCEPTANCE. 5. NO WATER TO BE SPRAYED ON SIDEWALK, PARKING LOT, ROAD OR ADJACENT PROPERTY. ADJUST ARC AND RADIUS OF REQUIRED SPRINKLERS AS NEEDED. 6. ALL CIRCUIT PIPE IS TO BE CLASS 160 PVC OR HIGHER GRADE. 7. ALL MAIN FITTINGS SHALL BE REINFORCED WITH 2000 PSI POURED CONCRETE THRUST BLOCKS. 8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONSTRUCTING THE REQUIRED SYSTEM IN COMPLETE ACCORDANCE WITH ALL APPLICABLE CODES, ORDINANCES, AND LAWS. ANY MODIFICATION MADE AFTER INSTALLATION, TO CONFORM WITH SAID CODES, LAWS AND ORDINANCES, SHALL BE PERFORMED AT THE CONTRACTOR'S EXPENSE, AND AT NO ADDITIONAL COST TO THE OWNER. M)" I At"fl, IREFER TO SURVEY FOR EXISTING CONDITION SYMBOLS LEGEND 00 1 0 NEW BUILDING CONSTRUCTION AREA OF CONCRETE NEW POLE SIGN LOCATION NEW CONCRETE PAVING BLOCK NEW LIGHT POLE LOCATION AREA OF DESIRED IRRIGATION COVERAGE NEW TREE REFER TO PLANTING SCHEDULE FOR SIZE AND TYPE NEW SHRUB REFER TO PLANTING LEGEND FOR SIZE AND TYPE RESUR FEB 15 2011 FM m 1 ru f% I n mr=A MIMI BRUCE M. CAR SON architecture - planning - Interior design BRUCE M. CARLSON, ARCHITECT 219 N. 2ND ST., SUITE 301 MINNEAPOLIS, MN 55401 PHONE: (612 (61 ) 338-6677 FAX: 2) 338-2995 E—MAIL: info@cmarch.com CONTACT: JESSICA IVERSON jiverson@cmarch.com CONSULTANTS: CEI ENGINEERING, INC. 2277 WEST HIGHWAY 36, SUITE 200 ROSEVILLE, MN 55113 PHONE: 651-697-0800 FAX: 651-697-0804 AST, INC. 5001 AMERICAN BLVD W, SUITE 800 BLOOMINGTON, MN 55437 PHONE: 952-854-9302 FAX: 952-854-9690 DUNHAM ASSOCIATES, INC 50 SOUTH SIXTH ST, SUITE 1100 MINNEAPOLIS, MN 55402 PHONE: 612-465-7550 FAX: 612-465-7551 5449 REGISTERED RCHIT ECT 8, UCE %1. CARLSON C STATE 6OF v�iASHINIGTON BRUCE M. CARLSON, ARCHITECT 8-26-10--- DATE ISSUED 5449 REG. NO. Ma 4P I)i i SHEET TITLE: IRRIGATION PLAN 11mmommmm REVISIONS: NO: DATE: BY: PROJECT NO: 10120.007 ................................................................ ........... DRAWN BY: JU SHEET 3 OF 3 BUSINESS NAME: SEA AUTO SALES BUSINESS TYPE: CAR DEALERSHIP ADDRESS: 22908 HWY. 99, EDMONDS, WA 98026-8466 OWNER: SHELLEY 230TH, LLC PARCEL #00576700000308 ZONING: GENERAL COMMERCIAL (CG) PROPERTY IS IN UNINCORPORATED SNOHOMISH COUNTY .2 #4622 RIM=393.26 'RCP (NE)=386.01 W_ 'RCP POWER POLE (SW)=386.11 'RCP (NW)=s86.11 -CROSS BAR ELEV.=431.7 lz W OVER TV .E PUNCH. IN CASE. OVERHEAD CABLE TV LINE EAD POWER ELEV.=431.7 7OVERHEAD POWER ELEV.=431.8 GRAPHIC SCALE 0 10 20 .40 1" 20 FEET BUSINESS NAME: PUBLIC STORAGE BUSINESS TYPE: STORAGE FACILITY ADDRESS: 23010 HWY. 99, EDMONDS. WA 98026 OWNER: PUBLIC STORAGE PROP XVIII PARCEL #00576700001305 ZONING. GENERAL COMMERCIAL (CG) PROPERTY IS IN UNINCORPORATED SNOHOMISH COUNTY )EPTH OF SEWEF JNE AT THIS LOCATION= 12.81' Z eel ........... DEPTH OF SEWER LINE AT THIS LOCAT10N=1 0.14! -'%00 :t. V _R! _55, UL OF (3) "'POWER LIIS STA110NING FOR SR99 PER WSDOT SUR VEY PERFORMED JANUARY 11, 1927 HZ SURVEY CONTROL POINT #302 INDEX DA TA.' NE114, NE114, SECTION31, TOWNShIP27N., RANGE4E. WILLAMETTEMERIDIAN BASIS OF BEARING MINITY MAP BASIS OF BEARING IS SOO*33'4B"E ALONG THE EAST LINE OF NE QUARTER OF FIRE HYDRANT SECTION 31, TOWNSHIP 27 NORTH, RANGE 4 EAST AND IS. BASED SNOHOMISH COUNTY SURVEY CONTROL POINTS MTLK 113 AND MILK 119 s DISTANCE TO PROPERTY UN;r=71.e 8* DIA. HORIZONTAL DATUM BUSINESS NAME-- BRENTWOOD PLAZA WATER LINE BUSINESS TYPE, STRIP MALL SNOHOMISH COUNTY SURVEY CONTROL, WASHINGTON STATE PLANE COORDINATE ADDRESS: 22921 HWY. 99, TLK 113 & MTLK. SYSTEM, NORTH ZONE, NAD 83/91, BASED ON POINTS M EDMONDS, WA 98026-8468 OWNER: CODY & CINDY RYU MTLK 113 N: 292634.353 PARCEL #00576700000205 sw E: 1271196.033 DROP LINEONEAS T alk ZONING: GENERAL COMMERCIAL (CG) DESC.: CONC. MONUMENT W/TACK IN LEAD IN CASEAT THE INTX. OF 228 2307H SW ST. SW AND 76TH AVE. W. SIDE OF POLE 7 CL 8' WIDE A MTLK 119 N:289975.139 DRI WAY SDMH #4248 "N RIM=379.12 E. 1271169,881 T kR & CAP TB k, "I'll, I... eA t` ��`kl:,SET REB 234TH N 'OF 236 ST. SW AND TX. , jy, , 8" DI 761H AVE. W. yo, 112:ABS (N)=368.42 1­1 Av 'A 0 25' WEST OF POWER (SOLID LID) DESC.: 3" DIA. BRASS DISC IN CASE ATTHE I 238IN T. sw 31: 1121'RCP (E)=368.52 NOTE COORDINATES SHOWN ABOVE ARE GRID COORDIN�'TES. HELD LOCATION POLE ELEV.-391.55 '?"'WATER LINE "'M FACTOR -w- LAKE OVERHEAD CABLE ALLINGER OF MTLK 113 FOR APPLYING SCALE FACTOR. SCALE' 0.999958312000 (NOT CGF) OVERHEA6 V ELEV.=408 0 27- DIA. STEEL R TV ELEV.=413.4 WRAPPED VER77CAL DA TUM 4,; ''OVERHEAD POWER n 2447nu sww (MAPNOT --w I CH MARK #HC 17-12, 3"�" OVERHEAD POWER -D--- SCALE) ELEV.=427. 7 �OVERHEAD OVE GAS UNE WSDOT SURVEY CONTROL., BEN H. RHEAD POWER ELEV. DIAMETER BRASS DISC SET IN THE NORTH SIDEWALK OF 18.31 ELIEV.-,421.4 THE OVERPASSAT THE INTERSECTION OF INTERSTATE k;4 LE OVERHEAD CA TV ELEV.=,,405 HIGHWAY 5 AND SOUTH 216TH STREET. ELEVATION OF LEGAL DESCRIP77ON '0 481.293 FEET. NAVD 88. YOU 1EAD POWEI THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE COUNTY OF SNOHOMISH, 'ELEV.=420.4 CL 5' OVERHEAD I OW LL OWER ONSITE PROJECT CON7ROL STATE OF WASHINGTON, AND IS DESCRIBED AS FOLLOWS: 31 LLEV.=418.3 SWIM- H :OH—bH OH V�__ — — — SET TBM 0.25 FEET WEST OF POWER POLE W/ LIGHT PARCEL B. CITY OF EDMONDS LOT LINE ADJUSTMENT FOR ARMADILLO STORAGE, fit r OH H.2- OH -OH -OH AT THE NORTHWEST CORNER OF SITE. TBM IS A nr-vwnuQv UNULK ZNUMVMIZIN UVUN I T RECORDING NUMBER 200412105223, RECORDS OF SNOHOMISH COUNTY. WASHINGTON. REBAR AND PLASTIC HZ SURVEY CONTROL CAP SET ki OH —OH m I ICU UATU non"mn rf r%fA'nf%k1 DON wo w L -LLAWL LOT _L QIP- UNE a(JKVtT LtA=t1VLU LI:CiAL 1&Zi(;H11j11 N HZ#301 N: 291932.3366 , X, ii� , , - —.r- RIM=392.54 I D PN2-7 POWER POLE CROSS BAR 71 OVERHEAD SDI PARCEL B 39 v HIGH GATE UPPER BAR ELEV.=417.8 E. 1270605.9615 WIDE DRIVE LOWER BAR EVEV.=405.2 12"DIP (NE)=.389.90 ;9;12r"w lGi nN.. I 27.5' 6 LINE' POWER LEASE LOT ELEV.=391.59 THAT PORTION OF TRACTS 14 AND 15, SKELTON'S MC ALEER FIVE ACRE TRACTS, .... ... ... . . r REBAR W/HZ PLASTIC CONTROL CAP ACCORDING TO THE PLAT THEREOF, RECORDED IN VOLUME 6 OF PLATS. PAGE 21, gm, r ELEV.=427.6 X. OVERHEAD POWER 12-DIP (SW)=389.96 R,18 L-;31.94!A RECORDS OF SNOHOMISH COUNTY; WASHINGTON, DESCRIBED AS FOLLOWS: -2 R-44.01Y f _X ELEV.=418. HZ#302 N: 291759.1377 OVERHEAD 0=41 46 FOUND REBAR W/ NO CAP -7 1 1 - 'POWER 25 MPH SPEED COMMENCING AT THE SOUTHWEST CORNER OF SAID TRACT 15; AS SHOWN ON THAT E: 1270446.5957 LOT UNE ELEV.=399.92 WHICH '%PN4-2 LIMIT SIGN VOLUME 35 OF SURVEYS, PAGES 219-220, BEARS N86*1%3'52mE, I EA n r CERTAIN SURVEY RECORDED UNDER ELEV.=427.5 0 35' FROM PROPERTY CORNER RECORDS OF SAID COUNTY, THENCE NORTH 00' 31' 03" EAST ALONG THE WEST LINE PK NAIL W/HZ BRASS WASHER THENCE NORTH 62* 59' 27* WEST A MgEN K_ (1) POWER METER HZ SURVEY ;R1. OF SAID TRACT 15 A DISTANCE OF 335.82 FEET, NOTE: COORDINATES. SHOWN FOR ONSITE CONTROL ARE in DISTANCE OF 113.24 FEET TO THE -EAST'MARGIN OF SR 99; THENCE NORTH 27' 00' e REBAR W/ M GROUND COORDINATES LA 33" EAST ALONG SAID MARGIN A DISTANCE OF 51.14 (1) JUNCTION BOX CONTROL 41�1 x CAP POINT #301 MOUNTED ON 6'-HIGH REFE VE Ys PONT OF a RENCE. SUR FEET TO JHE ;12 L".14.39! SEGINNINC THENCE CONTINUING ALONG SAID MARGIN A DISTANCE OF 226 FE .41 ET TO R-20.01Y 1. BLA FOR THE ARMADILLO STORAGE BY DANIEL ROUPE, AFN 20041210522& STREET' -SW.- THENCE 'tOU.114`� tAbl ALON'G­ y, r1l #44,01 SAID MARGIN'A DISTANCE OF- 93.38 FEET. THENCE SOUTH 0" 54� 12" WEST A D-4113!59 m 2. ROS FOR 23031 SR99 BY ED CALLAHAN, C & C SURVEYING, AFN 910808500i. DISTANCE OF 1.72 FEET TO THE BEGINNING OF A CURVE TO THE LEFT HAVING A LEASE LOT LINE 1*487A; 3 3. ROS FOR G.R.S. DEV. SERVICES BY KENNETH LONG, AFN 8408285002. RADIUS OF 44.00 FEET, THENCE SOUTH ALONG SAID CURVE THROUGH A CENTRAL �AB H �s RAILROAD TIES \ � n. POINTAT WHIC F41 FENCE CROSSES ANGLE OF 41* 35' 46" AN ARC DISTANCE OF 31.94 FEET TO -A POINT OF REVERSE 4. ROS FOR AMERICAN DISCOUNT CORP. INC. BY MAWWELL MEYRING, AFN 8404245006. CURVATURE AND THE BEGINNING OF A CURVE TO THE RIGHT HAVING A RADIUS OF PROPERTY LINE' 41' 13! SURVEYOWS NOTES 20.00 FEET, THENCE SOUTHERLY ALONG SAID CURVE THROUGH A CENTRAL ANGLE OF I O-ER METER & 59" AN ARC DISTANCE OF 14.39 FEET TO A POINT OF TANGENCY, THENCE -r ZY 3" DIA. STEEL POST JUNC11ON BOX 1) FIELD MAPPING COMPLETED IN JANUARY/FEBRUARY, 2010. INSTRUMENT USED, TRIMBLE SOUTH Oo 32' 24" WEST A DISTANCE OF 233.65 FEET, T ENCE NORTH 89* 27' 36" H 5603 DR200+ ROBOTIC TOTAL STATION. THIS SURVEY CONTROL TRAVERSE MEETS OR WEST A DISTANCE OF 92.28 FEET; THENCE NORTH 57' 19' 40" WEST A DISTANCE OF HI ""n 2.5- HIGH W/ EXPOSED 5' HIGH ON NW WIRES AT TOP OF POST CORNER OF BLDG. EXCEEDS THE REQUIREMENTS OF WAC 332-130-090. 81.61 FEET, THENCE NORTH 55* 54' 18" WEST A DISTANCE OF 58.51 FEET TO THE 2) FULL RELIANCE HAS BEEN PLACED ON FIDELITY NATIONAL TITLE INSURANCE COMPANY POINT OF BEGINNING. (2) POWER JUNCTION BOXES 4.' UNDER ORDER NO. 201001194, DATED JANUARY 21, 2010 AT 8:00 A.M. FOR LEGAL SAID PARCEL CONTAINING 0.997 ACRES, MORE OR LESS. (1) TELEPHONE BOX -10. MOUNTED ON WOOD POST DESCRIPTION AND REVELATION OF EASEMENTS AND MATTERS OF TITLE. NO FURTHER # K"'! SEARCH OF THE RECORD HAS BEEN MADE. SCHEDULE B ITE14S HIGH ABOVE GROUND �3 3) THE SITE HAS IMPROVEMENTS ON IT CONSISTING PRIMARILY OF T 0 BUI w LDINGS, GRAVEL FIDELITY NA71ONAL TITLE INSURANCE COMPANY A.LT.A COMMITMENT, ORDER NO. PARKING LOT AND LIMITED UTILITIES.+ THE SITE SURVEYED CONTAINS 0.997 ACRES, MORE X, A: 201001194, EFFEC71VE DATE JANUARY 21, 2010 AT 8:OOA.M. OR LESS. -DRIVEWAY."'. c 4 co 4) ACCESS TO A PUBLIC STREET IS rpnm QTAir mn"Tr ao QITC UAC C0nK1TAf-_r I I EXTRUDED co k7 230TH ST. SW BUT'CURRENTLY HAS NO MEANS OF ACCESS TO SCHEDULE B EXCEPTIONS-. 12N DIA. CAST [IRON CURB Z - r- THIS STREET. PIPE WATER LINE Pcq,,--. 'nAmnomw DACT wl tTrm 3" DIA. PVC PIPE r co 0 Two, ciTr ic urrum Tur r%mv nr uniAmme twry "im TWOn"PlU 005 UA%Jr Me% ACL-Vrk-r 4-5,; 4" - DIA. STEEL WRAPPED INTERMEDIATE PRESSURE e�, GAS LINE CL 5'�WID HC RAM SDCB #4664 RIM=390.86 1 TABS (NE)=385.81 12*DIP (gW)=385.86 SDCB #4663 ,RIM-391.19 (SOLID LID) 12"DIP (NE)=387.," I -DIP (SW)=387.53 2 POWER POLE CROSS BAR ELEV.=427.8 V7 < 0 c 0 v 10 Z I Z Z 0 C14 < Q_ 0 0 0 � V) III H o 5; cn < 0 w cr < m z 0 V) V) 0 P z < %_., 0 LL_ UJ 0 0 < 01 1 C3 Z N 0 f 04 (0 (Do -LJ "t 0--% :3co n 0 0) 0 04 o x U) .r 0) co 0 04 f2 Lo 04 0 to 0 (L W V114 Mr- r 1.5' ABOVE GROUND . ..... tj @ " 3 12 5 �4 11 CAP TYPICAL (5 TOTAL) 6) NO CHANGES IN THE ALIGNMENT OR WIDTH OF STATE ROUTE 99 OR 230TH ST. SW IS PLANNED AT THE TIME OF THIS SURVEY.: SR99 CONTACT PERSON FROM WSDOT REAL EASEMENT(S) FOR THE PURPOSE(S) SHOWN BELOW AND THE RIGHTS INCIDENTAL THERETO, AS SET FORTH IN A DOCUMENT: �WATP_R, ESTATE SERVICES DEPARTMENT IS JOHN JENSON, (206) 440-416.3 AND FOR 230TH ST. SE lit 00 E3 Z3 w ......... . 49.05*- Y+ - 1 �i GRANTED -TO: PUGET SOUND ENERGY . ..... ;­ THE CONTACT PERSONS NAME IS JOANNE ZULAUF, PHONE NUMBER 427-771-0220. Lu %J w PURPOSES: ONE OR MORE UTILITY SYSTEMS, TOGETHER WITH ALL 3: 0 .4v 7) STATE ROUTE 99 (SR99) IS A 45 MPH ROAD AND CONSIDERED A PRINCIPLE ARTERIAL ;!4 PAVEMENT WIDTH ALONG SR99 IS APPROXIMATELY 83 FEET FROM' WEST FACE OF CUR "'A APPURTENANCES Z �0; z EAST FACE OF CURB. - 230TH ST. SW IS 25 MPH ROAD AND CONSIDERED A LOCAL STREET. RECORDING DATE: JANUARY 10, 2006 INFORMATION SIGN RECORDING NO.: 200601100964 cc PAVEMENT WIDTH ALONG 230TH ST. SW IS APPROXIMATELY 40 FEET (CI rY Or EDMONDS 44 19 E] D = AFFECTS: PORTION OF SAID PREMISES AND SHOWN HEREON TOP OF S . IGN ELEV.=417.7 2009 COMPREHENSIVE TRANSPORTATION PLAN FOR ROADWAY. CLASSIFICATIONS) BOTH' 0 z "ARE UNDER THEAURISDICTION OF THE CITY OF EDMONDS. M24 EASEMENT(S) FOR THE PURPOSE(S) SHOWN BELOW AND THE RIGHTS INCIDENTAL y HEAT SR99 AND 230TH ST. SW PUMPS DECK 3, 8) THISSITE APPEARS ON FEmA NA11ONAL FLOOD INSURANCE RATE -MAP (FIRM), DA-TED TO, AS SET FORTH IN A DOCUMENT' mr.Kt V NOVEMBER. 8,1999, COMMUNITY PANEL NUMBER 530,61C1315E AND. IS.LOCATED IN N �LOOD GRANTED. TO: CITY OF EDMONDS A ZONE 'X'. AREAS DETERMINED TO BE OUT' -THE OUTSIDE THE 500 YEAR FLOODPLAIN. PURPOSES: R16HTS OF THE PUBLIC TO MAKE NECESSARY sLopEs FOR CUTS 9) AY STATIONING STA710NING BASED ON WSDOT RECORD OF SURVEY DATED PA OR FILLS UPON THE LAND IN THE REASONABLE ORIGINAL ILROA, 1/11/27. RECORD OF SURVEY PROVIDED TO HUITT-ZOLLARS BY THE WSDOT GRADING OF STREETS, AVENUES, ALLEYS AND ROADS. 5 A RIGHT-OF-WAY MANAGER, STEVE PALMEN. PHONE NUMBER 360-705-7465. STATIONING RECORDING DATE: MARCH 20, 1984 --39.3 M L eXtRWED REFERENCE POINT IS THE INTERSECTION OF THE CENTERLINE OF SR99 AND -THE NORTH LINE RECORDING NO.: 8404160148 'CURB THE NORTH SIDE OF PARCEL A IR OF SEC11ON 31. AFFECTS: 'GFI�VEL 1O)MINIMUM COVER FOR CITY OF EDMONDS WATER LINES IS 24 INCHES. INFORMATION N DE ENCROACHMENT NOMS Y.* a #40 PROVIDED BY JOANNE ZULAUF NTH THE CITY OF EDMONDS. DRIVEWA 11) THERE WERE ONLY TWO POWER POLES NTH TRANSFORMERS LOCATED NEAR THE SITE. THE 1) WOOD RAILROAD TIES CROSS OVER PROPERTY LINE (OUTSIDE OF SITE) AT THE 7YPICA�) Smp FIRST ONE IS #2455 AND IS 10W NORTH OF THE INTERSECTION OF 230TH ST. SW & SR99 WHM MOST SOUTH WESTERLY CORNER OF THE PROPERTY BY 3.24 FEET. SOUTH OF THE 2) FENCE RUNNING NORTH AND SOUTH ALONG EAST PROPERTY LINE IS APPROX 4's. ILP ON THE WEST SIDE OF SR99 AND THE OTHER ONE IS.#4594 AND IS 215 79 50' n 12) GAS SERVICE FOR PROPERTY OFF OF 230TH ST. SW AND IS A 2- STEEL WRAPPED LINE. UNDERGROUND - t ' '.3 � � % L, . SITE ON THE WEST SIDE OF SR99. 1.0 FOOT INSIDE PROPERTY LINE. T, , rL,-.-L FE 'o' PAINT MARK DI �OWER el I RAILROAD SAPPiARS NO RECORDS WERE FOUND FOR THE SIZE OF THE ONSITE GAS LINES BUT ACCORDING TO IINETYPES 'n z .4p .:: : , ES SINGLE STORY M013ILL HVIAL AT TU10 OMKIT w , " - ­��'. , ­L "' �;.` � PSE 1HEY SHOULD BE A 1/. OR.1-1/2 LINE. —X—X— CHAIN LINK FENCE LINE — -D- - — STORM UNE BUILDING HEIGHT=10.1 DIM NNISHED FLOOR ELEV.=398.15 13) WHERE NO PROPERTY CORNER WAS FOUND A 2' LONG 5/8- DIA. REBAR AND PLASTIC CAP 40 BUILDING 60 p D- - STAMPED HALVORSON LS#44632 WAS SET. _07— WOOD FENCE LINE _OH OVERHEADPOWERLINE NO BASEMENT 0 CA SETBACK LINE L4 14)ALL DISTANCES SHOWN ARE GROUND DISTANCES. 'o ;s along= EDGE OF LANDSCAPE -TV OVERHEAD TELEVISION cn 0 U77LITY STATEMENT,& —274— 1 -FOOT CONTOUR LINE LINE FOUND kEBAR 0 cam N THE UNDERGROUND UTILITIES SHOWN HAVE BEEN LOCATED BASED ON FIELD INFORMA71ON BUILDING OVERHEAD _G- NATURAL GAS LINE W/ NO CAP LINESS NAME: VACANT BUSINESS PROVIDED BY UTILITY DETECTION SERVICES, LLC (UDS), MAPS PROVIDED BY MUNICIPALITIES OR LINE ADDRESS: 23005 HWY 99, EDMONDS. WA 980261 f '(A 14 Zt Z Z JUNCTION BOX U-71UTY COMPANIES, AND EXISTING DRA% NGS. E PHONE NUMBER FOR UDS IS P- - BURIED POWER LINE M TH -W- WATER UNE POINT OF BE(NNNING OWNER:_ SHIOMI INVESTMENTS LLC -829-5166 AND THE TICKET NUMBER IS 8788. THE SURVEYOR MAKES 360 PARCEL #00576700001410 cn 5' HIGH ON NW NO GUARANTEE -Z -T - - BURIED TELEPHONE LINE RAILROAD TIES CROSS OVER >j THAT TH9,UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREAp EITHER PROP LINE. AT THIS POINT PROP.ERTY AREA=43,429 SO. FT. SEWER LINE uv F.BLDG. S 1N ERVI .;'--THE* SURVEYOR.��'FURTHER -DOES -NOT -WARRANT THAT THE .ERTy :Ok­0.067_ ACRES S CE OR`A9ANDbN)E0 g ,,,g ._ROCKERY. UNDERGROUND U71UTIES SHOWN ARE IN THE EXACT LOCA71ON INDICATED ALTHOUGH HE DOE SURF, cno. -4 s co w Mfg ZONING: GENERAL COMMERCIAL (CG) FIDELITY 00 1 STATE THAT THEY ARE LOCATED AS ACCURATELY AS POSSIBLE FROM INFORMATION AVAILA OF TITLE. SOURCE Zip; -HAS NOT PHYSICALLY LOCATED THE UNDERGROUND U LI ES. A." THE SURVEYOR NATIONAL TITLE INSURANCE COMPANY J. ILI ZONING & BUILDING LIMITA77ONS 14 T 60 FEET, CONCR ZONING: (CG), GENERAL COMMERCIAL MAXIMUM BUILDING HEI ETE GRAVEL ASPHALT GHT. A FOUND REBAR AND CAP SETBACKS: SIDE YARD MINIMUM NONE 17", N I X.- HIGH 4 FEET 17 Y"r 4 STAMPED G4 INC. LS#30450 MINIMUM STREET SETBACK REAR YARD NONE LEGEND 398 ov, Z r- XZ,.-P"s" C-. TE C *INFORMATION REFLECTS THE MOST CURRENT DATA AVAILABLE AS OF THE DA HEREOF. WE 00 9' RECOMMEND THAT ALL INFORMATION BE VERIFIED TO CONFIRM THAT NO CHANGES IN ZONING 0 FO UND REBAR CAP AS NOTED io STORM DRAIN ROOF DRAIN (SDRD p- oz F- Lq 7� OR BUILDING LIMITATION HAVE OCCURRED SINCE THE DATE OF THIS SURVEY. SET REBAR AND CAP STAMPED 0 GUARD POST OR SUPPORT POST 0 -SURVEYOR"S CERMICAWN HALVORSON LS#44632 L16 IL 41 pl, (A t ft ......... . ui (A V) (A -=MB MAIL BOX w 5 Fu M T - !N11, 0 A21 HEREBY CERTIFY TO FIDELITY NATIONAL TITLE GROUP AND O'REILLY AUTOMOTIVE, INC.) THAT- LANDSCAPE LIGHT PN4-,Y 4- -aj x o fw ob U49C STREET -SIGN ....... FOUND REBAR AND CAP 1.THE PLAT OF SURVEY PREPARED BY ME ENTITLED 'VREILLY AUTOMOTIVE EDMONDS S 201 LIGHT PULL BOX STAMPED G4 INC. LS#30450 Ny / - Qs, SANITARY SEWER CLEANOUT (SSCO) . ........ 0 -PUN . ..... ITE, is z cc) z 4 ACTUALLY MADE UPON THE GROUND AND THAT IT AND THE INFORMATION. COURSES AND 1N LIGHT STANDARD W1 ARM w j M z 2.THE TITLE LINES AND LINES OF ACTUAL POSSESSION ARE THE SAME; FIRE HYDR 0 SANITARY SEWER MANHOLE (SSMH) mw m A 3.THE SIZE, LOCATION AND TYPE OF BUILDINGS AND IMPROVEMENTS ARE AS SHOWN AND ALL ANT NJ /6 '391 DISTANCES SHOWN THEREON ARE CORRECT; 4'T ...... ... . .. LIGHT STANDARD z J= VIP UP F --- el�Mp 0 4.THERE ARE NO VIOLATIONS OF ZONING ORDINANCES, RESTRICTIONS OR OTHER RULES AND POWER FLANGE=392.4 ARE WITHIN THE BOUNDARY LINES OF THE PROPERTY, POINT AT WHICH ARMAN' ES `E.�;i$ G TOR 'o � t FENCE CROSS %'TN TELEPHONE MANHOLE % YARD LIGHT X DISTANCE TO PROPERTY UNE=0.70' PROPERTY LINE TOPI, REGULATIONS NTH REFERENCE TO THE LOCA71ON OF SAID BUILDINGS AND IMPROVEMENTS; % Vt TELEPHONE RiSER/PEDISTAL 03 BOX MONUMENT IN CASE -.39 5.THERE ARE NO DISCREPANCIES, CONFLICTS, SHORTAGES IN AREA OR BOUNDARY LINE V VA R.. TV < N89*27*360W 92.2W LEM AW Z Ic %p 1P IL w CONFLICTS, EASEMENTS, ENCROACHMENTS, DRIVEWAYS, CEMETERIES, BURIAL GROUNDS OR PK NAII A.�� MM11370 TOCT' z SINGL CONCRETE BLOCK 7REE TABLE BUILDING PN1,1 1" PINE BUILDING HEIGHT=11.3" PN4,2-4 4" PINE FINISHED FLOOR PN6,5-6 6" PINE ELEV.=399.88 NOTE: NUMBER PRECEDING TREE DESCRIPTION INDICATES BUSINESS NAME: POTTERY DEPOT (CLOSED) DIAMETER OF TRUNK IN INCHES. NUMBER FOLLOWING ADDRESS: 2,3029 HWY. 99, EDMONDS, WA 98 6 1 OWNER: SHIOMI INVESTMENTS LLC, PARCEL 4005767 0001412 TREE DIAMETER IS THE INDIVIDUAL TREE NUMBER. PARCEL 'C' OF ARMADILLO STORAGE BLA kF.N.200412105223 ZONING: GENERAL COMMERCIAL -.(CG). 47 U77LITY COMPANIES ? L WATER SMRM NATURAL GAS GARBAGE -/RECYCLING CITY OF EDMONDS CITY OF EDMONDS PUGET SOUND ENERGY ALLIED WASTE R 121 5TH AVE. NORTH, 2ND FLR. 121 5TH AVE. NORTH, 2ND FLR. 10606 NE 4TH STREET COMMERCIAL lot EDMONDS, WA 98020 EDMONDS. WA 98020 BELLEVUE, WA 98009 DEVELOPMENT DEPT. A P (425) 771-0220 (425) 771-0220 (425) 806-7817 1600 127th AVE. NE a CONTACT PERSON: CONTACT PERSON: CONTACT PERSON: BELLEVUE, WA 98005 JENNIFER COLLINS JERRY SHUSTER JOHVANNA STANSBERRY (425) 646-2492 CONTACT PERSON. NO w SEER ELECTRICITY PHONE SPECIFIC CONTACT in CITY OF EDMONDS SNOHOMISH COUNTY P.U.D. VERIZON PERSON p 121 5TH AVE..NORTH, 2ND FLR. 21018 HWY. 99 18700 33RD AVE. W ;i EDMONDS, WA 98020 EDMONDS, WA 98026 LYNNWOOD, WA 98036 POINT OF COMMENCEMENT 8 P) (425) 771-0220 (425) 670-3200 (425) 771-6244 SOUTHWEST CORNER OF TRACT z CONTACT PERSON: CONTACT PERSON: NO SPECIFIC CONTACT PERSON: OF SKELTON'S MC ALEER JENNIFER COLLINS CONTACT PERSON JIMMY COLLINS FIVE ACRE TRACTS 4 4-[ SINULL WV11 WOOD FRAMED BUILDING BUILDING HEIGHT�-16.0'1 77 USES AFFECTING THIS PROPERTY APPEARING FROM A CAREFUL: PHYSICAL INSPECTION OF 'T j_9 NO CAP THE SAME, OTHER THAN THOSE SHOWN AND DEPICTED THEREON; 0 REBAR m; f 6.ALL MONUMENTS SHOWN ACTUAL Y EXIST AND N S ZE AND E OF SHRUB AP 0 �11 L THE LOCA110 11TRL REBAR AND SURVEY*CONTROL CAP TYP :s c MATERIALS ARE CORRECTLY SHOWN AND WERE LAST VISITED IN 2/2010; 7.THE DISTANCE FROM THE NEAREST INTERSECTING STREET OR ROAD IS AS SHOWN; (�6i TELEVISION MANHOLE 'v a NATURAL GAS METER TELEVISION VAULT L &THIS PROPERTY HAS DIRECT ACCESS TO SR99, A PUBLICLY DEDICATED STREET. 9.ALL UTILITY SERVICES REQUIRED FOR THE OPERA71ON OF THE PROPERTY EITHER ENTER THE U NATURAL GAS VALVE �M D1, ;URB,�gc`. PROPERTY THROUGH ADJOINING PUBLIC STREETS OR THE SURVEY SHOWS THE POINT OF IRRIGATION CONTROL BOX duli-."), ­s? ENTRY AND LOCATION OF ANY UTILITIES THAT PASS THROUGH OR ARE ON ADJO NING POWER POLE ANCHOR vs PRIVATE LAND; -c POWER GUY POLE FIRE HYDRA . . . . . . . . . . . . . CAI TO THE MAPS OF THE FEDERAL EMERGENCY MANAGEMENT AGENCY AND THE DEPARTMENT R"oET I E & �7-�O �*� ` N i:i:4 10. THE PARCELS DESCRIBED HEREON DO NOT LIE WITHIN FLOOD HAZARD AREAS ACCORDING zsT t _5 kjrTro n HOSE BIB L WO Ljr- J.0 n1%jn Vr MUDINU ANU VKESAN DEVELOPMENT, AND 'MINIMUM X ��fi 'ztONCRETE'WALL 11. THIS IS TO CERTIFY THAT THIS MAP OR PLAT AND THE SURVEY ON MICH IT IS BA SED -Cp POWER POLE ES WATER METER WERE MADE IN ACCORDANCE NTH THE STANDARD DETAIL REQUIREMENTS FOR R 12* ABS -D- - ALTA/ACSM LAND TITLE SURVEYS," JOINTLY ESTABLISHED AND ADOPTED BY ALTA AND NSPS POWER PULL BOX OR JUNCTION BOX WATER VALVE W" ......... . . . . . . Bg IN 2005, AND INCLUDES ITEMS 1-6, 7A, 13-10, 11B, 13, 17 OF TABLE A THEREOF. 4 V PURSUANT su DATE: POWER POLE NTH DROPLINE 'W" WATER VAULT A TO THE ACCURACY STANDARDS AS ADOPTED BY ALTA AND NSPS AND IN EFFECT ON THE NAME: ARMADILLO LIU ,:­,127 DATE OF THIS CERTIFICATION. UNDERSIGNED FURTHER CERTIFIES DRAWN BY. SELF STORAGE 2 0jkSS E. STORAGE FAC L URVEYOR Typ THAT IN MY PROFESSIONAL OPINION, AS A LAND S POWER POLE WITH DROPLINE, LIGHT, (0 LANDSCAPE ROCK r 2 1 I ITY HAZ AND TRANSFORMER CHECKED BY: LS LANDSCAPE AREL REGISTERED IN THE STATE OF WASHINGTON, THE RELATIVE = _�& POWER POLE WITHuGHT z z�, � P_!, e 9 WC�NG M PROJ. N ADDRESS' 2.3031 HWY. 99, S106NAL ACCURACY OF THIS SURVEY DOES NOT EXCEED PO EDMONDS, WA 98026 0. OWNER: SHIOMI INVESTMENTS LLC THAT WHICH IS SPECIFIED THEREIN. EXCEPTIONS PARCEL #00576700001406 MARCH 1. 2010 POWER POLE WITH LIGHT, AND DIP DUCTILE IRON PIPE ARC- L 'A' OF ARMADILLO STORAGE BY. HUITT­z RS, INC. TRANSFORMER RA A RN 2noA1910r,99.1 ARQ Af%.*%A nNIT011 C 0"TAMICK10 2-17-10 ERH sw 15-0964-01 SINGLE STORY - STORAGE UNI IS I -?�- POWER POLE WITH TRANSFORMER CONCRETE BLOCK BUILDING ZONING: GENERAL COMMERCIAL (CG) 448= .../ STYRENE PIPE ...... rX, STORM DRAIN CATCH BASIN (SDCB) RCP REINFORCED CONCRETE PIPE BUILDING HEIGHT=13.8" ERIK R. HALVORSON, PLS Y" SHEET: - SV I FINISHED FLOOR ELEV.=389.51 STATE OF WASHINGTON REGISTRATION NO. 44632 STORM DRAIN MANHOLE (SDMH) DRAWING REVISION NUMBER ZL It SO-W-11D �1111r) - k :2 (L 04 I--, `Zl- C*4 0 U) (D 0 d 0 U) 0 Ile L. 0 S: Ld 0 E _0 Ld 04 0 X, 51 j>:'. s", �3 A A\ A\ A\ IeP O'Re illy A U'to - P a r- ts 100'-O"X 75�0ff SQ. FT. = 7, FLOOORREELE-VATI .501 ol noomm . ...... /, SUCCEEDING SHEETS: 100.00 S"' I PA' -- �,l -?D-:N` N 1% 110 f (-;;i % It ..... ..... )5'54 w ....... ....... 5 5 T" No// V. . . ..... ....... .. " . ............. 14 .... ....... .......... ... . ....... ... I . . ....... V ys -4- SCALE- I- 2W SIC(I", LISTED ELEVATIONS ARE BASED o ON SITE SURVEY. SEE SV1 FOR Ulls? MORE INFORMATION. HEIGHT CALCULATIONSO ;,<q- I � Q� I�AU C-� C—\ C3 TOP OF PILASTER A B C D TELEV. 118'-6" j- Tr-,D r-IC DADADMT TELEV. 117'-6" ,J, EAVE HEIGHT ELEV. 115'-lm ,4,,FINISH FLOOR HEIGHT TELEV. 100--0- BOTTOM OF FOOTING RE: TO FOUNDATION PLAN lj; I w ivc �i 11 1 6m MAXIMUM BUILDING ELEVATION = 453.7" ACTUAL BUILDING ELEVATION = 416.37' AZF,R0VE--D F"O ANNING X �V- AVERAGE GRADE = 393.7' H CARLSON ...................... architecture - planning - Interlordesign BRUCE M. CARLSON, ARCHITECT 219 N. 2ND ST., SUITE 301 MINNEAPOLIS , MN 55401 PHONE: (612) 338-6677 FAX: (612) 338-2995 E—MAIL: info@cmarch.com CONTACT: JESSICA IVERSON live rson@cmarch.com CONSULTANTS: CEI ENGINEERING, INC. 2277 WEST HIGHWAY 36, SUITE 200 ROSEVILLE, MN 55113 PHONE: 651-697-0800 FAX: 651-697-0804 AST, INC. 5001 AMERICAN BLVD W, SUITE 800 BLOOMINGTON, MN 55437 PHONE: 952-854-9302 FAX: 952-854-9690 DUNHAM ASSOCIATES, INC 50 SOUTH SIXTH ST, SUITE 1100 MINNEAPOLIS, MN 55402 PHONE: 612-465-7550 FAX: 612-465-7551 SEAL: %, 544 9 R kjI RED CL,9TE ED ITE� CT CHITECT DRUCF M. CARLSON 'Ls'o �STATUECCO)-F'�l,�VAO'&A.9'iNGT�C04)N BRUCE M. CARLSON, ARCHITECT 8-26-10 DATE ISSUED 5449 REG. NO. REVISIONS: NO: DATE: BY: PROJECT NO: 10120.007 ....... 11 1 ......................................................................... DRAWN BY: Ju ................................................... T 2 SHEET 2 OF 2 y Llc�Hi-F.D cji(z%Ni W1. FLA6�Tlc, r,-NU-5;�D (50TH c-)IIDEc>) All"-ITZED tvit-T. rrvNmif— . FbAC-� LIT �V- LIJI P*,� T LAMr>e.;5 (6 WATT LANlr��'>) COLOR r6UX-UWD`( UZTTL:rs � 600,,.Dr-r-, H V/Y. 9c) -80'- C PINVI NG) LINE 4 15'-0" LAND5CAPE AREA (TYP.) EX�BT. TREPb oTkAREA LIGHTING �l (TYF'.,e 05TREET E�t-ET'PACK) VARJEE:i ECTION THR"', U""" PROPERTY a HWY.99 ...SCALE:l .-301-011�'. L t V SCALE: 1/2 1 0 SCALE: 3 1'-0"