Loading...
23109 94TH AVE W.PDFiiiiiiiiiiii 9204 23109 94TH AVE W Permit No: City 'of Edmond,s 4. TION P'EIMIT IssueDate: �0110162_ RIGHT-OF-WAY CONSTRUO A. Address or Vicinity of Construction: z� i b 4� B. Type of Work (be specific): �e 0 9 0 a Q LU C. Contractor: Pi I C-4 L�6 'A Mailin2Address: State License #: A k S D. Building Permit # (if applicable): Contact: Phone:, L/ ��Uiabiiiiy Insurance: Bond: $ Side Sewer Permit # (if applicable): E. F1 Commercial E] Subdivision 0 City Project EUC (PUD, GTE, PSE, CHAMBERS, OVVvD) El Multi -Family Single Family F] Other INSPECTOR- F. PAVEMENT: YES f-1 NO G. SIZE OF CUT x H. Charge: CONCRETE CUT: YES E] NO ]DEMNITY.. Applicant understands by hislher sig"n'ature to this application helshe holds the City 6f.Ediiz6fids harm.lessfrom.injuries, damages'or claims of any kind or description whatsoever, foreseen or unforeseen, that maybe made against the City of Edmonds or, any of its departments or employees, including but not limited to the"defense of any legal proceedings including defelise"costs and attorney'fees by reason ofgranting this permit. THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL INSPECTION AND ACCEPTANCE OF THE WORK ESTIMATED RESTORATION FEES WILL BE HELD UNTIL THE FINAL,STREET PATC[i IS COMPLETED BY CITY FORCES, AT WHICH T1MEA_DEBITOR CREDIT WILL BEPROCESSED FOR ISSUANCE TO THEAPPLICANT. * Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer.. Every fligger must be trained as required by (WAQ 296-155-305'and must have' certification verifying, completion of the required training in theirpossession. * Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City - approved material priorto the end of the workday — NO EXCEPTIONS. Three sets of construction drawings of proposed work are required with the permit application. IHAVEREAD THE ABOVE STATEMENTS AND UNDERSTAND THE PERMIT REQUIREMENTS ANDACKNOWLEDGE THATIMUSTMAKE THEPINKCOPYOF THE PERMITA VAILABLE ON SITE AT ALL TIMES FOR INSPECTIONS UPON COMPLETION OF PERMITTEDVOAk,ANINGINEERING FINAU.­- INSPECTION IS REQUIRED PER CHAPTER 18.00 OF THE EDMONDS COMMUNITY DEVELOPMENT CODE. FINAL APPROVAL OF PERMITTED WORK. INSPECTWS S ATURE DATE: /)J!2:25 119E Forinspe etion requirements see Engineering'Information Ifindout. NO WORK SHAIA, BEGIN PRIOR TO PERMIT ISSUANCE EOM 5'E-WPL, 255W LOQ— 5W-WPL, 157W--'_______0)_J1 PROP 1- 114 PE 1P MAN LOC- 5Z-WPL 1 0 4 =120 LOC- 1-114".X 1 " WELD REDUCER 1 —1 !_s- — 9329 1 1 1970 �D 'E- W FLO I awv LOC- TIE-RV 1 " SERV 5T­WPL, 155W EX EOM 156W LOC- JOB SITE I ail 1/?7 86-N F_ &0--' 1970 9327 CLI LLJ co 232_ST I SW AV 2"STW IP 17-S 20' T= W _Uj I Q zo 11-100 I- Ica 00 1 co co 10) 0) CD :CI-j V_ T_ �io5l V_ 9CE6 OM VICINITY MAP I FITTER (CHECK BOX IF COMPLErE) Work area left in Clean & Safe condition Complete all Pipe Tables —and Gas Pressure Stomp Field changes Red —Lined on as —built Material verified and Changes oted on paperwork All Volvo & Tie—in Locations oted on as —built Note beginning of Main, EOM & Line of Main locations Show Rope Locations & Cul—de—sac Radius Foreman's Signature Company Employee ID# STANDARD NCC CONSTRUCTION NOTES: 1. FIELD LOCATE ALL UNDERGROUND UTILITIES. CALL "ONE— CALL" 48 HOURS PRIOR TO CONSTRUCTION, 1-800-424-5555. 2. ALL CONSTRUCTION IS TO CONFORM TO PSE GAS OPERATING STANDARDS AND GAS STANDARDS PROCEDURES MANUAL. 3. INSTALL MAIN VALVES OUT OF TRAFFIC WHERE POSSIBLE. 4. ANY CHANGE IN ROUTE, TIE—IN METHOD OR ADDITIONAL MAIN FOOTAGE MUST BE APPROVED BY PSE REPRESENTATIVE. 5. COMPLETE *PIPE CONDITION REPORT" ON ALL EXPOSED EXISTING PSE FACILITIES. CHECK BOX ON REPORT FOR WIRE BOX (TEST LEAD) INSTALLATION. 6. INSTALL ONE POUND ANODE FOR EVERY 1000' OF LOCATING WIRE. INSTALL ANODE AND TEST LEAD WIRES PER PSE GAS OPERATING STANDARDS 14.2 AND 14.5. 7. MAINTAIN CATHODIC P ROTECTION FOR STEEL MAINS BY THE USE OF CONTINUITY BONDS OR OTHER MEANS DETERMINED BY THE PSE CORROSION ENGINEER PER PSE GAS OPERATING STANDARDS 10.3 8. INSTALL ANODES AND TEST LEAD WIRES AS REQUIRED PER PSE GAS STANDARDS PROCEDURES P0201 AND P0303 AND PSE GAS OPERATING STANDARD 10.2. TEST LEAD WIRES ARE REQUIRED ON ALL TRANSITION FITTINGS. 9. REFER TO PSE GAS OPERATING STANDARD 6.8 FOR MAIN AND SERVICE COVER REQUIREMENTS. 10. MAINS AND SERVICES SHALL BE TESTED AND PURGED PER PSE GAS OPERATING STANDARDS 6.14 AND 6.17. 11. COORDINATE INSTALLATION WITH CORROSION CONTROL. AND ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. 12. EROSION AND SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 TECHNIQUES FOR TEMPORARY EROSION AND SEDIMENT CONTROL GAS MAIN INSTALLATION / RETIREMENT I R SIZE PROP. LENGTH I xerm 1'n?E I MANUFACTUR ER P, PROJECT PHAqF ORDER # NOTIF # GAS MAIN 107012218 X942680602 SERVICE 1060766788 GAS MAIN PRESSURE & TESTING TYPE TEST. PRESSURE; TESTED BY: DATE ON: TIME ON: DATE OFF- TIME OFF. DESIGN: 60 PSIG MAOP 45 CONSTRUCTION COST CODES 011-103-1 CHAD ROTHSCHILLER 23109 94 AV W EDMONDS, WA 98020 425-705-3668 CALL 1-800-424-5555 2 BUSINESS DAYS BEFORE YOU DIG THIS SKETCH NOT TO BE REUED UPON FOR EXACT UXATION OF FACILITIES REAL ESTATE/EASDAENT FtEO'D PERMIT N/A FUNCTION CONTACT PHONE NO DATE PROJECT MGR: DOUG USITALO (206) 418-4236 12/17/01 ENGR — GAS- ( ) — / / DRAWN BY: PEGGY SHULL (206) 418-4253 12/17/01 DATE Ery CHECKED ErY: DOUG USITALO (206) 418-4236 C"ft SNO EMER 5 Work Centw MCNSEG APPROVED 13Y' DOUG UMSFTALO (206) 418-4236 FOREMEN #I: NE 36- 27-03 OP MAP ie*n" I PIAT Wr 166.067 FORD" #12. JOINT FAciLM ARRANGEMENTS UMMEs I I I CHAD ROTHSCHILLER 1-1/4- PE IP MAIN EXTN new 23109 94 AV W )RS, INC. EDMONDS 1070122181 SCAM, I' - 50