Loading...
23112 102ND PL W (2).PDF1111111111 215 23112 102ND PL W STREET FILE may 11, 1988 f Le MAY 2.3 1988 EA'G"1VEE-R11VG Tom Whalen 23112 102nd Place West Edmonds, WA 98020 Edmonds School District #15 Administrative Offices 3800 196th SW Lynnwood, WA 98036 Dear Sir or Madam: Over the past ten years during times of heavy rainfall, my property has been subject to damage by run-off water from the Woodway High School property. In the past, although the damage has.been minimal, the run-off has periodically made property use inconvenient. It is also very frustrating. I had a paved circular driveway installed this past spring. I now fear another rush of water would cause major damage. I believe the reason for the excessive water flow is an inadequate or poorly functioning surface water retention system. I would like to see the School District and/or the City of Edmonds take necessary action to eliminate the problem. I have taken photographs of the water run-off problem and I would be happy to make them available for your review. I consider this an urgent and important..matter�.­ Please let me hear your thoughts and plan promptly. Sincerely, Tom Whalen 747-2191 (Business) 776-2248 (Residence) cc: City of Edmonds C) 0 C) C3 Z W W x �- w C3 E3 0 L'i w Z > r w 0 lx m -4 Ir in a. w w W bg o 0 0 Ld 0 z 8 L 0 C K T r .GENERAL NOTES 1. LOCATIONS OF EXISTING UTILITIES AND IMPROVEMENTS SHOWN ARE APPROXI- MATE ONLY AND IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE EXACT LOCATION(S) OF ALL UTILITIES AND IMPROVEMENTS TO AVOID DAMAGE OR DISTURBANCE. 2. ALL CONSTRUCTION SHALL CONFORM TO THE "STANDARD SPECIFICATIONS FOR MUNICIPAL PUBLIC WORKS CONSTRUCTION" AND STANDARD PLANS AS ADOPTED BY THE CITY OF EDMONDS, AND ANY REQUIREMENTS ESTABLISHED AT CITY HEARINGS ON THIS PLAT. 3. ALL CONSTRUCTION IS SUBJECT TO THE INSPECTIO N BY THE CITY OF EDMONDS AND THE CONTRACTOR SHALL NOTIFY THE CITY OF HIS SCHEDULE IN SUFFIC- IENT TIME TO PERMIT INSPECTION PRIOR TO AND DURING THE WORK. 4. ALL WORK WITHIN THE PLAT AND CITY RIGHT OF WAY SHALL BE SUBJECT TO THE INSPECTION OF THE ENGINEER. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL PERMITS FOR ROAD AND UTILITY CONSTRUCTION. 6. ALL SEDIMENTATION/EROSION FACILITIES MUST BE IN OPERATION PRIOR TO CLEARING AND BUILDING CONSTRUCTION, AND THEY MUST BE SATISFACTORILY MAINTAINED UNTIL CONSTRUCTION IS COMPLETED AND THE POTENTIAL FOR ONSITE EROSION*HAS PASSED. 7. THE STORM DRAINAGE SYSTEM SHALL BE CONSTRUCTED ACCORDING TO THE APPROVED PLANS WHICH ARE ON FILE AT --THE Cl-..TY­�.O�,DMONDS. ANY DEVI- ATION FROM THE APPROVED PLANS WILL PEQUIR�E� 00ROWL" FROM THE PROPER AGENCY, CURRENTLY THE CITY OF EMONDS ENGINE(9_-�A DEPARTMENT, 8. A COPY OF THESE APPROVED PLANS MUST BE ON THE�J*—SITE WHENEVER CON- STRUCTION IS IN PROGRESS. 9. THE STORM WATER INFILTRATIONSYSTEM SHOWN HEREMtI.S FOR THE ROADWAY ONLY. LOTS 2 THROUGH 4, INCLUSIVE, SHALL PROVIE�g--INDIVIDUAL ON -SITE DRAINAGE SYSTEMS IN ACCORDANCE WITH CITY STANDARD PLANS, AND SHALL BE SUBMITTED WITH THE BUILDING PERMIT APPLICATION FOR EACH LOT. ic 0 �011 1p� Ae F LOT 112 rATMOWA EX. MLl �36 n Qf 30, ELEV - 369.1,5 CA P __k�-6"FVC FEE ELEV 3G715 kD 6CREEN W17-11 F1L7_E;c? —ASSOCIAFED 00