23112 102ND PL W (3).PDF1111111111
215
23112 102ND PL W
STREET FILE
may 11, 1988
f Le
MAY 2.3 1988
EA'G"1VEE-R11VG
Tom Whalen
23112 102nd Place West
Edmonds, WA 98020
Edmonds School District #15
Administrative Offices
3800 196th SW
Lynnwood, WA 98036
Dear Sir or Madam:
Over the past ten years during times of heavy rainfall,
my property has been subject to damage by run-off water
from the Woodway High School property.
In the past, although the damage has.been minimal, the
run-off has periodically made property use inconvenient.
It is also very frustrating.
I had a paved circular driveway installed this past
spring. I now fear another rush of water would cause
major damage.
I believe the reason for the excessive water flow is an
inadequate or poorly functioning surface water retention
system. I would like to see the School District and/or
the City of Edmonds take necessary action to eliminate
the problem.
I have taken photographs of the water run-off problem
and I would be happy to make them available for your review.
I consider this an urgent and important..matter�. Please
let me hear your thoughts and plan promptly.
Sincerely,
Tom Whalen
747-2191 (Business)
776-2248 (Residence)
cc: City of Edmonds
C)
0
C)
C3 Z
W W
x �- w
C3
E3 0
L'i
w Z
> r
w
0
lx
m -4
Ir
in a.
w w
W
bg
o
0
0
Ld
0
z
8 L 0 C K
T
r
.GENERAL NOTES
1. LOCATIONS OF EXISTING UTILITIES AND IMPROVEMENTS SHOWN ARE APPROXI-
MATE ONLY AND IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO
DETERMINE THE EXACT LOCATION(S) OF ALL UTILITIES AND IMPROVEMENTS
TO AVOID DAMAGE OR DISTURBANCE.
2. ALL CONSTRUCTION SHALL CONFORM TO THE "STANDARD SPECIFICATIONS FOR
MUNICIPAL PUBLIC WORKS CONSTRUCTION" AND STANDARD PLANS AS ADOPTED
BY THE CITY OF EDMONDS, AND ANY REQUIREMENTS ESTABLISHED AT CITY
HEARINGS ON THIS PLAT.
3. ALL CONSTRUCTION IS SUBJECT TO THE INSPECTIO N BY THE CITY OF EDMONDS
AND THE CONTRACTOR SHALL NOTIFY THE CITY OF HIS SCHEDULE IN SUFFIC-
IENT TIME TO PERMIT INSPECTION PRIOR TO AND DURING THE WORK.
4. ALL WORK WITHIN THE PLAT AND CITY RIGHT OF WAY SHALL BE SUBJECT TO
THE INSPECTION OF THE ENGINEER.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL PERMITS FOR
ROAD AND UTILITY CONSTRUCTION.
6. ALL SEDIMENTATION/EROSION FACILITIES MUST BE IN OPERATION PRIOR TO
CLEARING AND BUILDING CONSTRUCTION, AND THEY MUST BE SATISFACTORILY
MAINTAINED UNTIL CONSTRUCTION IS COMPLETED AND THE POTENTIAL FOR
ONSITE EROSION*HAS PASSED.
7. THE STORM DRAINAGE SYSTEM SHALL BE CONSTRUCTED ACCORDING TO THE
APPROVED PLANS WHICH ARE ON FILE AT --THE Cl-..TY�.O�,DMONDS. ANY DEVI-
ATION FROM THE APPROVED PLANS WILL PEQUIR�E� 00ROWL" FROM THE PROPER
AGENCY, CURRENTLY THE CITY OF EMONDS ENGINE(9_-�A DEPARTMENT,
8. A COPY OF THESE APPROVED PLANS MUST BE ON THE�J*—SITE WHENEVER CON-
STRUCTION IS IN PROGRESS.
9. THE STORM WATER INFILTRATIONSYSTEM SHOWN HEREMtI.S FOR THE ROADWAY
ONLY. LOTS 2 THROUGH 4, INCLUSIVE, SHALL PROVIE�g--INDIVIDUAL ON -SITE
DRAINAGE SYSTEMS IN ACCORDANCE WITH CITY STANDARD PLANS, AND SHALL
BE SUBMITTED WITH THE BUILDING PERMIT APPLICATION FOR EACH LOT.
ic
0
�011
1p�
Ae
F
LOT 112
rATMOWA
EX. MLl �36
n
Qf
30,
ELEV - 369.1,5
CA P
__k�-6"FVC FEE
ELEV 3G715
kD
6CREEN W17-11 F1L7_E;c?
—ASSOCIAFED 00