Loading...
23124 76TH AVE W.PDF11111111 lill 6397 23124 76TH AVE W ADDRESS: TAX ACCOUNT/PARCEL BUILDING PERMIT (NEA COVENANTS (RECORDED), FOR: CRITICAL AREAS: DETERMINATION: E] Conditional Waiver [] Study Required e<aiver DISCRETIONARY PERMIT #'S: DRAINAGE PLAN DATED: PARKING AGREEMENTS DATED: EASEMENT(S) RECORDED FOR: PERMITS (OTHER): PLANNING DATA CHECKLIST DATED: SCALED PLOT PLAN DATED: 11160 SEWER LID FEE SHORTPLAT SIDE SEWER AS BUILT DATED: &.Z� —SMA�'V SIDE SEWER PERMIT(S) #: SOILS REPORT DA STREET USE / ENCROACHMENT PERMIT LID LOT: BLOCK: LATEMP\DSrs\Fonns\Street File (�hecklist.doc FILE NO. Critical Areas Checklist ---------------------------------------------- Site Information (soils/topography/hydrology/vegetation) / I Site Address/Location: el Property Tax Account Number: Z 3. Approximate Site Size (acres or square feet): 19 4. Is this site currently developed? yes: no. A, k.�o Q 4/ If yes; how is site developed? .4. 2 5. Describe the general site topography. Check all that apply. X' Flat: less than 5-feet elevation change over entire site. Rolling: slopes on site generally less than 15% (a vertical rise of 10-feet over a horizontal distance of 66-feet). Hilly: slopes present on site of more than 15% and less than 30% ( a vertical rise of 10-feet over a horizontal distance of 33 to 66-feet). Steep: grades of greater than 30% present on site (a vertical rise of I 0-feet over a horizontal distance of less than 33-feet). Other (please describe): 6. Site contains areas of year-round standing water: /I - _ ; Approx. Depth: 7. Site contains areas of seasonal standing water' .,--c,,_; Approx. Depth: What season(s) of the year? 8. Site is in the floodway floodplain A) C"i of a water cou r . se. 9. Site contains a creek or an area where water flows across the grounds surface? Flows are year- round? / 4) Flows are seasonal? 4 `if) (What time of year? 10. Site is primarily: forested meadow ;shrubs mixed urban landscaped (lawn,shrubs etc) A-t 11. Obvious wetland is present on site: /t/c, DETERMINATION City of Edmonds CRITICAL AREAS CHECKLIST The Critical Areas Checklist contained on this form is to be filled out by any person preparing a Development Permit Application for the City of Edmonds prior to his/her submittal of a development permit to the City. The purpose of the Checklist is to enable City staff to determine whether any potential Critical Areas are, *or may be, present on the subject property. The information needed to complete the Checklist should be easily available from observations of the site or data available at City Hall (Critical Areas inventories, maps, or soil surveys). An applicant, or his/her representative, Must fill Out the checklist, sign and date it, and submit it to the City. The City will review the checklist, make a precursory site visit, and make a determination of the subsequent steps necessary to complete a development permit application. Please submit a vicinity map along with the signed copy of this form to assist City staff in finding and locating the specific piece of property described on this form. In addition, the applicant shall include other pertinent information (e.g., site plan, topography map, etc.) or studies in conjunction with this Checklist to assist staff in completing their preliminary assessment of the site I have completed the attached Critical Areas Checklist and attest that the answers provided are factual, to the best of my knowledge (fill out the appropriate column below). Owner/Applicant: Name n '53 ( ;' e. r. Street Address Ll—/ I z - city State Zip Telephone Signature,,_ Applicant Representative: Name Street Address City State Zip Telephone Signature Date c:recepfion�anakacl - doc W1 Date (over) M -t � (3 PC. JS9 ApH130,1999 0 0 CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 - FAX (425) 771-0221 DEVELOPMENT SERVICES DEPARTMENT Planning - Building - Engineering Sonoma Development 20351 Greenwood Ave. North Shoreline, WA 98133 Subject: Determination regarding Critical Areas Checklist # 99-111 BARBARA FAHEY MAYOR Dear Applicant: Enclosed please find a copy of the Critical Areas Checklist you submitted. The "DETERMINATION" reached by the City is located on the reverse side of the form (bottom of page). It is very important for you to retain a copy of this Critical Areas Checklist "DETERMINATION" for your records. IMPORTANT INFORMATION TO BE NOTED. PLEASE EXAMINE THIS" DETERMINATION" FOR ADDITIONAL REQUIREMENTS. YOU MAY NEED TO SUBMIT ADDITIONAL INFORMATION SUCH AS AN ENVIRONMENTAL CHE��S� OR CRITICAL AREAS STUDY. The 'DETERMINATION' for the Critical Areas Checklist you submitted is a site -specific determination not a project -specific determination. You must submit a copy of the CRITICAL AREAS CHECKLIST and DETERMINATION WITH ALL PERMIT APPLICATIONS or YOUR APPLICATION WILL NOT BE PROCESSED. Permit applications include the following: Building Permits Conditional Use Permits Subdivisions Variances Applications to the ADB* Land Use Applications Any other development permit applications. Enc: Critical Areas Determination * Architectural Design Board Thank you. Sharla Graham Planning Secretary C:Reception\Jana\CRLTR.doc Incorporated August 11, 1890 Sister City - Hekinan, Japan PROW ME I FILE APPLICATION CARI for The City of Edmonds SIDE SEWER FERYaT OUTSIDE INSIDE REPAIRS EASEMENT Q7.�� 0 OWNER... .... ....................................... ........... ... CONTRACTOR ........ ........................ p . ............................ PERM. "1 -311 HOUSENo. - ---------------------------- ----................................................... STREET AVENUE LOT No . ........ ......................... ...................... ...... -b".' BLOCK..-N ........ ...... NAMEADD . ............................................................ ........... ............ ........ J� ? 0 'j �'D 0s BACKFILL WORK ORDER ISSUED.: ................................. DEPOSIT, $ ---------------------------- - ............... 'e SEWER WORK ORDER ISSUED ....................... ........ ....... DATE./ NOTICE: No warranty of accuracy. The information shown on the attached map(s) was compiled for use by the City of Edmonds, its Employees and Consultants. The City of Edmonds does not warrant the accuracy of anything set forth on these map(s). Any person or entity requesting a copy should conduct an independent inquiry regarding the information shown on the map(s), including, but not limited to,� the location of any sewer stub shown. Such sewer stubs may or may not exist and may or may not exist at the location shown. Neither the City of Edmonds nor its employees or officers shall be liable for the information given on this map(s), nor for any one representation provided based upon said map(s). city -of talao- na; i rl LEPermit No: m n RIGHT-OF7-WAY,CONSTRUCTION PERMIT Issue Date: A. Address or V Vicinity of Construction: _2 2) 1 .9 4'�, -7 (AX UV- W be specific)::TN-\,5� 9,A '62 600t S B. Type of Work( r@ i3'� LIJ 0-IL, o� 7 u? 9 A c),o �4- jo-zosPP ct Contact: C k- C. dontrdcto*r: XA 0 d', Mailing Address: 1333D Phone:,­Qok L41 R - a 39 St I ate License #:. _�Kt H C_ z 10 1 1 V� Liability Insurance: 'Bond:$ D. Building Permit # (if applicable): Side Sewer Permit # (if applicable): E. Commercial EJ Subdi�ision CityProject EUC (PUD, VERIZON, PSE, , 'AT &­T, OVWD) El Multi -Family Single Family r-1 Other F. PAVEMENT CUT: El YES El NO G. SIZE OF CUT X CONCRETE CUT: Ej YES [I NO Al"I'LICANT TO 111,"Al) ANI) SIGN INDEMNITY. Applicant understands by his/her signature to'this application halshe holds the.City of Edmonds harmless ftom injuries, damdges or claims of*any kind or description whatsoever, foreseen or -unforeseen, that may be made against th .�.City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorneyfees by reason ofgranting this permit. THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOHING THE FINAL INSPECTION AND ACCEPTANCE OF THE WORK ESTIMATED RESTORATION FEES WILL BE HELD UNTIL THE FINAL STREET PATCH IS COMPLETED BY CITY FORCES, AT WHICH TIME A DEBIT OR CREDITR7LL BEPROCESSED FOR ISSUANCE TO THE APPLIC4NT. * Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by (WAC) 296-155-305 and must have certification ierifying completion of the required training in their possession. * Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City - approved material prior to the end of the workday — NO EXCEPTIONS. + Three sets of construction drawings of proposed work are required with the permit application. CALL DIAL -A -DIG (1-800424-5555) PRIOR TO BEGINNING WORK IHAVEREAD THE ABOVE STATEMENTS AND UNDERSTAND THE PERMIT REQUIREMENTS AND ACKNOWLEDGE THA TI MUSTMAKE THE PINK COPY OF THE PERMITA VAILABLE ONSITE A TALL TIMES FOR INSPECTIONS Date- Ca / 2164 (Contractor or Agent) FOR CITY USE ONLY Approved by: 477W Right-of-way Fee:;>",- a luc J127412a,0-A DisruptioxiFee/F 'd111: TimeAuthorized- oidAfter / ,zi, un e Special Conditions: Rrc,�O'or k�)\w -r0/_ / *'�c Af-4 4� ;,K,-s �,f,o ,.,gafffip Fee.,ZiQ $,-al. cvlak, .A& �6,0 ki r rrr P. 6: r. "D / r I ri ^4 f, rA 1 14 Aiir4 sxr�)-iACK Total Fee: 2 7.5. 0 raGA4 Ali ciTN or or_at4oAioc ALxar Receipt No: AKu At4h Jssued by:,. t'A AA_ Mt' I-m'#,r "I T7 A NA- I AQ Ov I fV- 1k A PA PA QF 4Q'?"fZ,1JQ N1 T 12W /0 144', X- -r-'A I �e t_ne, 'UJ 4.0ice'r-ft- 1-t4JC N1)Adt"kr1Z 8FZ / i'kA PIZ 46t Z'r& 12 'r AN I*N, r- f4A r" PAZnT*C UPON COMPLETION OF PERMITTED WORK, AN ENGINEERING FINAL INSPECTION IS REQUIRED PER CHAPTER 18.00 OF THE EDMONDS COMMUNITY DEVELOPMENT CODE (Phone 425-771-9220, Ext. 1326) FINAL APPROVAL OF PERMITTED WORK.- R?�J&L:L_ZL�_,�_CDATE: Inspector's Signature— 6�) -t t_1 .1. - �' 0 17,1,,,� For inspection requirements see Engineering Inspection Information handout. L09 DAMy Documents\Forms\Engnmg�ROWpermit_.doc F— Z_ Contidctors, Inc Job # 106131678 June 2, 2004 Sheet 1/1 Rob Inglisg MOM OVON C) WHY (13SO13 > V3(nnOHS 4 1HOI)i C) V3WAVMYM01 MH SSM GY3 HV a3SO1311VM3012 PRIVATE RD MM—PA—RK—IN-G� 1—=.=l TOWAWAYARa CHANNELIZATION DEVICE SPACING1 MPH TAPER TANGENT 50/70 80 35/45 30 60 25/30 —io— 76-- 41 50, SIDEWALK CLOSED 21' 1 21' LU Notes: 1. All signs and spacing t��,onfqrm to the MUTCD and City of Edmonds Traffic Control specs. 2. Channelizing devices are 28" traffic cones. 4. All signs are 48" x 48" B/O unless otherwise specified. 5. Alert affected residents. 3'X 6'WORK AREA IN PKG. SHOULDER OF 76th AVE W ROAD I WORK AHEAD -;;7 LEGEND a 28" TRAFFIC CONE WORK AREA TRAFFIC FLOW ARROWBOARD STANDARD GAS CONSTRUCTION NOTES: 21, INLINE TEE 469'S CL & 158'W CL --- I)s CL --- I)w CL 2"x 1 114'0 PE REDUCER 468'S CL & 158'W CL (---')S CL (---')W CL 2" INLINE TEE 469'S CL & 213'W CL (---')S CL (---')W CL 2"x 1 114" PE REDUCER 468'S CL & 213'W CL ( --- I)s CL (---')W CL 2" INLINE TEE 469'S CL & 268'W CL (---')S CL (---')W CL 2"x 1 114" PE REDUCER 468'S CL & 268'W CL (---')S CL (---')W CL S R/W 1 10, 9 EOM 2PP PE CAP 469'S CL & 326'W CL ( --- I)S CL (---')W CL PROPOSED 2" PE IP MAIN 469'S CL (---')S CL INSTALL 27' OF 1 114 " PE IP MAIN (TYPICAL) EOM 1 114 "E CAP A J.:, 434'S CL & 268'W CL --- 1)s CL --- I)w CL EOM 1 114" PE CAP 434'S CL & 213'W CL ( --- 1)S CL (---')W CL EOM 1 114" PE CAP 434'S CL & 158'W CL (---')S CL W CL 20' Q_ PROPOSED GAS 1 61 5' SEWER 10, CROSS SECTION OF 13-13 PVT RD SCALE: I" = 10' 230TH ST SW cuo� ;-144 �r�> —r— — CUW 2"x 1 114" PE REDUCER 468'S CL & 103'W CL (---')S CL W CL 00 --- CNN Ino a 0) r, in 0 2" INLINE TEE W 11- CY) to 469'S CL & 103'W CL C4 ')S CL ')W CL -4 Wl Z WZ I C'�z \)CVT ROADI :7N, UNIT UNIT! 'T I 1B UNIT' I UNIT� UJVA 1A 5B ;4B 12B UN jUNIT UNIT UNIT 4A 3A 2A A� 4A ............ .... ........ ... .............. A START OF JT PVT ROAD EOM 1 114" PE CAP 434'S CL & 103'W CL I)S` CL (---,)W CL EOM 584'S 30' 1 30' R/W R/W 2" 11E VALVE 46-O'S CL & 32'W CL (----')S CL CL TIE- Iff 2" BRANCH SADDLE 469'S CL & 28'W CL ')S CL W CL 243'N 2003 518" 243'JV 1998 'TI A PLOT PLAN NOTE: Install 12" sand at ading over gas If the final backfill contains rocks greater thir., 611 diameter. Rocks greater than 50'_ 10" In diameter are not permitted in the final backfill. W 60' E N R/W R/W R/W 30' -30' 28' EXISTING GAS I 17' WATFR CROSS SECTION OF A —A 76TH AVE W SCALE: 1 " = 10' 1. FIELD LOCATE ALL UNDERGROUND UTILITIES. CALL "ONE —CALL" TWO WORKING DAYS PRIOR TO CONSTRUCTION, IN WESTERN WASHINGTON CALL: 1-800-424-5555. IN KITTITAS COUNTY CALL: 1-800-553-4344 2. ALL CONSTRUCTION IS TO CONFORM TO PSE GAS OPERATING STANDARDS AND GAS FIELD PROCEDURES. 3. EROSION AND SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 TECHNIQUES FOR TEMPORARY EROSION AND SEDIMENT CONTROL AND ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. 4. NOTIFY PROPERTY OWNERS ADJACENT TO PROPOSED CONSTRUCTION ACTIVITIES A MINIMUM OF TWO WORKING DAYS PRIOR TO BEGINNING CONSTRUCTION. USE iSi TO DISTRIBUTE FLYERS IF JOB IS LARGE, OTHERWISE HAND DELIVER FLYERS BE SURE TO INCLUDE THE LIST OF FREQUENTLY ASKED QUESTIONS AND INFORMATION ABOUT THE OPPORTUNITY TO PURCHASE AN EXCESS FLOW VALVE WHEN THEIR SERVICE IS INSTALLED OR REPLACED PER GAS OPERATING STANDARD 2550.1600. ALLOW ADEQUATE TIME FOR CUSTOMER DECISION AND RESPONSE. 5. ANY CHANGE IN ROUTE, TIE—IN METHOD OR ADDITIONAL MAIN FOOTAGE MUST BE APPROVED BY PSE GAS ENGINEERING SERVICES. 6. COMPLETE "PIPE CONDITION REPORT" ON ALL EXPOSED EXISTING PSE FACILITIES. CHECK BOX ON REPORT FOR WIRE 9OX (TEST LEAD) INSTALLATION. 7. ACTIVE SERVICES DENOTED BY: Ex_ —xx—xl 8. PIPELINE MARKERS AND WARNING SIGNS SHALL BE INSTALLED AND RECORDED BY THE CONTRACTOR PER PSE GAS OPERATING STANDARD 2525.2500. 9. VALVE MARKERS SHALL BE INSTALLED AND RECORDED BY THE CONTRACTOR PER PSE GAS OPERATING STANDARD 2525.2600 FOR ALL HP VALVES IF THE LOCATION IS NOT REDILY ACCESSIBLE, AND FOR ALL VALVES WERE PERSISTANT SNOWFALL MAY OBSCURE THE VALVE BOX - 10. TO PREVENT ACCIDENTAL OVERPRESSURE OF ADJOINING SYSTEMS, NO TWO MAINS SHALL BE CONNECTED EXCEPT AS SHOWN ON THIS DESIGN UNLESS APPROVED BY PSE GAS ENGINEERING SERVICES. 11. SYSTEM MAOP DENOTED BY: FSYS M MAOP = _45— PSIG�l 12. RESTORE ALL DRIVEWAYS SUBJECT TO OPEN CUT TO ORIGINAL OR BETTER CONDITION. 13. GALIGE AND MONITOR USE OF ALL STOPPERS AND SQUEEZES TO ENSURE ADEQUATE FEED. (USE MANOMETER FOR LP SYSTEMS) 14. PURGE POINTS AND PRESSURE TAPS TO BE INSTALLED PER PSE GAS OPERATING STANDARDS 2525.3400, AND 2525.1200. NOTE: 4" separation If communications agree. Otherwise 12" separation are required. Gas—/ \_ Phone & Cable \— Power NTS FITTER (CHECK 13OX IF COMPLETE) Work area left in Clean & Safe ondition Complete all Pipe Tables and Gas Pressure Stamp Field changes Red —Lined on as —built Material verified and Changes oted on paperwork All Valve & Tie—in _Locations noted * on as —built Note beginning of Main, EOM & Line of Main locations Show Rope Locations & Cul—de—sac Radius Foreman's Signature Company Date JOINT TRENCH PLAT NOTES: 1 . NOTIFY APPROPRIATE PERMITTING AGENCY PRIOR TO JOB START (SEE PERMIT REQUIREMENTS). 2. ANY CHANGE IN ROUTE, PIPE SIZIE/TYPE, TIE—IN METHOD OR ADDITIONAL MAIN FOOTAGE MUST BE APPROVED BY THE APPROPRIATE ENGINEER /PROJECT MANAGER. 3. INSTALL MAIN VALVES OUT OF TRAFFFIC WHERE POSSIBLE. 4. INSTALL ONE POUND ANODE FOR EVERY 1000' OF LOCATING WIRE. INSTALL ANODE AND TEST LEAD WIRES PER PSE GAS OPERATING STANDARDS 2525.12 & 2525.23 5. MAINS AND SERVICES SHALL BE TESTED AND PURGED PER PSE GAS OPERATING STANDARDS 2525.33 & 2525.34 6. UNLESS OTHERWISE NOTED: ALL PIPES INSTALLED IN PLAT TO BE 2" PE—IP. ALL CROSSINGS TO BE YELLOW 4" PVC. ALL SERVICES TO BE 5/8" PE. DENOTES SERVICE STUB LOCATION. DENOTES FOOTAGE BETWEEN FITTINGS. 7. CUSTOMER TO DIG AND BACKFILL ON PRIVATE PROPERTY OR EASEMENT ONLY. TRENCHES MUST CONFORM TO PSE GAS OPERATING STANDARDS 2525.17, 2525.15 & 2525.16. 8. NOTE ALL RECORDABLE FOOTAGES, LOCATIONS AND MATERIAL CHANGES ON THE AS —BUILT IN RED. GAS MAIN INSTALLATIONIRETIREMENT TypelWork Pipe Size Type Estimated Length Actual Length Manufacturer INSTALLJT 21, jyE_ 302* INSTALL SCA 2" PE INSTALL _PE 108' GAS MAIN PRESSURE & TESTING TYPE TEST ��ESSURE TESTED BY DATE ON TIME ON DATE OFF TIME OFF TYPE TS RESSURE TESTED BY DATE ON TIME ON DATE OFF ITIME OFF Design Press 6�O Is S MAOp 45 1 PROJECT PHASE NOTIF# ORDER# 0 SAP Superior Service/Meter Service/Meter Service/Meter Service/Meter Ind. Service Ind. MSA Dis. Reg. / FT HP Svc/MSA Relocate Retirement X442830680 107020196 Vicinity Map WORK SITE 4 =Contractor: CONSTRUCTION COST CODES: 041-103-3 CALL (800) 424-5555 - 2 BUSINESS DAYS BEFORE YOU DIG Project Manager Contact Information: PATTI NESS THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF FACILITIES _FPERMIT CELL: 425-327-2783 REAL ESTATE/EASEMENT EMAIL: patti.ness@pse.com CSE CITY OF ED OND" REV# DATE BY DESCRIPTION FUNCTION CONTACT PHONE DATE PROJECT MGR PATTI NESS I 206-418-4237 5120104 3 ENGR-GAS 2 DRAWN BY M.JOHNSON 206-418-4257 5120104 CHECKED BY PATTINESS 206-418-4237 5/20/04 COUNTY EMER SECT GAS WK CTR APPROVED BY PATTI NESS 206-418-4237 5/20/04 SNOHOMISH 5 MCNSEG CP APPROVAL 77 1/4 SEC NW-32-27-04 OP MAP PLAT MAP 166.070 0 NE-31-27-04 164.068 166.069 MAPPING 1 ::�� I JOINT FACILITIES ARRANGEMENTS 0 UTILITIES SNOHOMISH CO. PUD VERIZON 0-MCAST 0 CONTACT CRAIG DEYOUNG BOB EMERY JEN JACOBSEN PHONE# 425-783-4488 425-308-7029 425-317-9601 — SAP Supe7ior Order PUGET S CL ENTERPRISES TOWNHOMES (10 UNITS) 107020196 Drawing Number: SOUND 21' PE 1P MAIN EXTENSION N/A ENERGY 23124 76TH AVE W EDMONDS, WA 98020 SCALE: PAGE: III= 50' 1/1 DESIGNED BY PILCHUCK CONTRACTORS INC. 0 J2 BARRIER FREE PARKING SIGN il T I �111111L "I" t", I I F�m GENERAL NOTES 1, aPNTRACTOR SHALL BE RESPONSIBLE FOR ALL SAFETY j*!REC,AUTION9 AND THE METHODS, SEOUENCES OR PROCEDURES RE�PUIRED TO PERFORM THE NORK. 2.. CeONTRACTOR SHALL BE RESPONSIBLE FOR THE ERECTION STABILITY AND TEMPORARY 5HORIN(9 AS NECE55AR*11 UNTIL PERMANENT SUPPORT AND 5TIFFENIN65 ARE INSTALLED. 5. 5AFr=T*r 6LAZIN6 SHALL BE PERMANENTLY LABELED PER U50 2406.2. TYPICAL PARTY WALL NOTES 1. PROVIDE SOUND TRANSMISSION CONTRC)L PER UBC, SEC. 1206 AND PER RECOMMENDATION OF THE CFr'P5UM ASSOC. FIRE RESISTANCE Dr=516N MANUAL (LATEST EDITION) 2. PROVIDE APPROVED FLEXIBLE SEALANT AT ALL PSALL EDC-PE5 AND PENETRATIONS. (AALL5 SHALL BE AIRTIC-jHT) 5. PROVIDE RESILIENT SLEEVES, MOUNTS, OR UNDERLA"rMENT5 AT 5UPFORT5 FOR CONDUITS, DUCTS, PIPES, AND VENTS. 4. ELECTRICAL BOXES SHALL BE OFFSET 5�r AT LEAST 2411 FROM BOXES ON OPPOSITE SIDE OF AALL AND ARAPPED INITH 2" MIN. FIBER INSULATION. TYPICAL MECHANICAL NOTES 1. PILOTS, BURNERS, HEATIN6 ELEMENT5AND 5V41TCHES OF THE FURNACE AND NATER HEATER SHALL BE A MIN. OF 15" ABOVE THE 6ARA6E FLOOR. 2. PROVIDE SEISMIC STRAPS FOR THE FURNACE AND AATER HEATER AS REWIRED 5",r CODE. 5. 6AS FIREPLACES SHALL BE FMI, MODEL D\/F5&, UL AND IC,5O APPROVED AND INSTALLED PER. MANUFACTUREW5 SPECIFICATIONS. FIREPLACES SHALL BE PROVIDED NITH T1rvHT FITTIN6 FLUE DAMPERS, OPERATED BY A MANUAL OR APPROVED AUTOMATIC., CONTROL. OUT51DE COMBUSTION AIR SHALL BE DUCTED INTO FIREBOX - MIN. & 50UARE_ INCHES I,^V DAMPER. 4. EXHAUST DUCTS SHALL TERMINATE OUTSIDE OF BUILDINS? AND SHALL BE EOUIPPED AITH BACKDRAFT DAMPERS. 5. CLOTHF5 DR,rER SHALL BE EXHAUSTED TO OUTSIDE. MAX LEN6TH OF VENT 19 14. 6. PLUMBIN6 FIXTURES SHALL HAVE MAX. FLON RATES AS FOLLOYiS: 5HOAER: 2.5 GjAL/MIN LA\/5: 2.5 6AL/MIN TOILETS. 1.6 6AL/MIN '7. HOT AND COLD INATER PIPES LOCATED IN UNCONDITIONED SPACES SHALL BE INSULATED To R-5 MIN. a. NATER HEATERS SHALL MEET THE REGUIREMENT5 Of= Icia-1 NAECA AND SHALL BE So LABELED. TYPICAL SECURITY NOTES 1. ENTRANCE DOORS: PROVIDE LOCK 1^V DEAD BOLT LATCH 1/2" MIN. THRON AND 1/4" PENETRATION INTO STRIKE. 2. SLIDIN& DOOR5 SHALL HAVE DEAD BOLTS OR OTHER APPROVED LOOKIN6 DEVICES. 5. V41NDOY49 SHALL HAVE INSIDE LATCHINC5 DEVICES. 4. EVER�r ENTRANCE DOOR SHALL HAVE A \/I 51 TOP, OBSERVATION PORT, 54" (MIN.) TO 66" (MAX.) ABOVE FLOOR. 5. PROVIDE SAFETY 6LAZIN6 PER U15C, SEC. 2406, AND NHr=R.r= SHOINN ON EXTERIOR ELEVATIONS. TYPICAL STRUCTURAL NOTES V41ND: EXPOSURE 5, L30 MPH SEISMIC, ZONE 5 SNO�N LOAD 25. LOS. SOIL BEARIN6 CAPACIT',r 2OOOP5F FOR OTHER LOAD VALUE5 SEE STRUCTURAL DRA�NIN65, 514T 51. FOR LUMBER AND PL',rVqOOD 5PECIFIOATIC)N5, 5EESHEET 51. FIRE PROTECTION SYSTEMS DEFERRED FOP, SUBMITTAL UNDER SEPAIRATE PERMIT. VIAQ CODE INFORMATION AHOLE HOUSE FAN (5 BDRM) ao cFm (MIN.), i:2o rFm (MAX.) SUPPLY VENTILATION: INTE6RAL INITH FURNACE EXHAUST FANS (INTERMITTENT EXHAUST) LOCATION CFM (MIN.) MFGR. MODEL CFM SONES KITC,HEN 100 NUTONE LL 160 *7.0 LAUNDR,r 60 NUTONE OTe)O 80 1.5 BATHROOM5* 50 NUTONE OT50 50 1.5 *INHOLP HOUSE FAN VVTIMER PER CODE 15 IN OATH. 1. LEAD DESIGN PROFESSIONAL SHAUN LEISER SOL ENTERPRISES, LLC, I'1q2I LINDEN AVENUE N SHORELINE, VqA cial55 PROPERTY OWNER: DONALD 6. 5PSEAZ"r. 1"7421 LINDEN AVENUE N, SHORELINE, ViA cIaI55 ARCHITECT: J F=RR*r JUTTI:N67 JERR-1- JUTTIN6, ARCHITF_CT 4114 PHINNE*�r AVE. N SEATTLE, AA 015105 STRUCTURAL -ENGINEER: R055 BAHARMA5T ASCON CONSULTIN6ENVNEERS 1515 5rd STREET KIRKLAND, V4A C15055 GENERAL CONTRACTOR: SHAUN LEISER 5C;L ENTERPRISES, LLO. I'7q21 LINDEN AVENUE N SHORELINE, VqA q6 [,55 SURVEYOR: LARRY DIXON EXACTA 5URVE**r'IN6�5ERVICE i:25o4 - 5ist AvENuE, NE SEATTLE, NA qaI25 206-565-0610 CIVIL ENGINEER: DEAN. HOU6H DEAN HOU6H - AND ASSOC I ATES. actia - lith STREET NE EVERETT, AA q5205-140-7 425-555-026:2 THIS DIMENSION STRIN6 SHOYiS NEV4 CONDITIONS TH15 DIMENSION 5TRINC-7 SHON5 EX15TINCS (E) CONDITIONS iu kb z 0L d6 K--'R NORW 'ODE C CODE: I cicl'T UNIFORM BUILDIN6 CODE SCALE. I"=20' -2-crt> r ,.��UNIFORM PLUMBIN6 CODE P59 C)E 6RAPHIC SCALE IcI`dI'7 UNIFORM MECHANICAL CODE Ljlr-lcl-1 UNIFORM FIRE coi;>e 2001 NASHIN67TON STATE ENER&Ir CODE INAC, 51-40 FOR BARRIER FREE ACCE551511_17Y vyA-v, Vi A-q ct:yw, 0 10 20 40 ZONING: RM-2.4 .. ......... ..... ....... ADB# 03-126. DATUM POINT: 5-75-ci-7 AT TOP OF RIM OF MANHOLE LOCATI D .,,(t0/1/03) NORTH OF NE OORNER OF 5UpJF=0T PROP;=RT-i-/ v -- 1. * A'A OCCUPANCY TYPE: R-5 (DUFLEX) NEBT OF CF----NTERLIN1r=- OF 5TREET. - LOTCOVERAGEt., U-1 (6ARACSES) ASSES R RCEL #: 00576700001604 LEGAL DESCRIPTION: LOT AREA 5F'- NORTH- a0:- F:F=aT-- OF:: So :f=EaT77.70-t=�'TRAOT 16, 51<r-LTON'5 LAf<F- NEA CONSTRUCTION dilleo 5F ,U_TH.; % LOT COVERAaE 40.2 % MeALE!F=R,.,* 5-, AcRE THE'PLAT THEREOF (45% MAXIMUM ALLONED) RECORDED— IN VOLUME� OF"PLATE5.: PA6E 21, REcopD5 OF: 5NOHOMIS.H COUNTY. ENSITY: D =,Ur;> r-ASz_!'1,-1EN7 ALON6 EAST 10 FEET. LOT AREA 24260 SF (RECORDED 5/20/141"75 REOORDIN6 # 25'7a2e)ct) AREA PER VINELLINC7 2400 5F MAXIMUM DV4I=LLINCv9 10.2 BUJ-LDJMG AREA (IN SF) SETBACK CALCS: UNIT' SARA61E FLOOR -I FLOOR 2 TOTAL (HEATED) FRONT YARD SETBACK, IA 450 451 0156 14'75 FRONT ',rARD SETBACe< 1,5-.25'r 15 5a4 461 c1cla 1465 (RECUIRED SETBACK Is). BLD6 1 a54 01"74 IcI84 24t5a REAR YARD, SETBACK: A 5a4 451 ct'74 1461 REAR YARD SETBACK = 15, 25 5a4 4a'7. C1014 14al (REOUIRED SETBACK = l5g BLDC7 2 '76e) 41"74 Idiba 26142 SIDE YARD SETBACK:, 5A 554 4a7 01-74 1461 51DE 'I'ARD SETBACK = 101 55 5a4 45-T dlct4 1461 (REouiRep SETBACK = log BLD6 5 -16a ct74 lat6a 7- PARKING: 4A Sa4 461 ctct4 14al 4B 564 4a,7 14 1461 20 SPACES PROVIDED IN 6ARACvES BLD6 4 "76a ci'74 ICI&a 2dT42 1 BARRIER FREE SPACEpRoviDeD (20 SPACES REOUIPMD) 5A 5a4 451 alcia 1465 55 5a4 451 "4 1461 5LD6 5 "768 cl-1.4 lctnsj;� ISEE REP RT D TED 20 JUL171, 2005 !A755 AC,11 101215 KENLAKE PLACE NE KENMORE, �NA atao2a 425-455-41154 BUILDING HEIGHT CALCS (FINISH 6RADE AT 5"75.5 FOR 5LD(55 2,54 AND 5) zi L (FINISH 6RADE AT,51-7.1 FOR BLD6 1) ACTUAL MAX ACTUAL M rAX 5LD6 A 5 D AVE TO PLATE TO PLATE TO RIDrvE TO RIr:>6E- L,15LD6 1 5-76.5:'5`75 51a 5"78.15 5411.4 405.15 405.4. 406.15 t �-51_=>Cv 2 515 515.5 515 516 405.15 404.2 40a.15 5LDC-7 5 511.5 51a 5"76 511"IS 511.25-5cla.2 402.25 k` 404.2 40'7.25i,-� ,-15LD67 4 5"77 575.5 576 516.50i-51q5.2 401.50v-` 404.2 406.50 t_� 5LDC7 5 5-7-7 5*71 516 575.5 516.55�-5c15.2 401.55 v-- 404.2 406.5a ZONE SETBACKS: FRONT SIDE APPROVED BY PLAN�NG REAR _J. OTHER HEIGHT APPFIOVED BY PLANNING J 2RAKN6 INDEX A I 51TE PLAN A2 FOUNDATION FLAN5 A5 FIR5T FLOOR PLAN5 A4 5EC�OND FLOOR PLAN5 A5 ROOF f`RAMIN6 PLAN5 A4 ELEVATIONS A5 ELEVATION5 Ab Dr-I"AIL5 AND 5EOTION LI LANDSCAPIN6 PLAN 5 5TRUCTURAL NOTE5 AND DETAIL5 C, 01\11L FLAN5 AND DETAIL5 00 R 1E. C CE H "if E. D 2 12604 COUNTER 81 -� z Lu % < T It G O)z x c: 0 (3 IL > < c- CL c- OL Pi It Lw uj U) -x Z w cu 0 U) fi LU C.0 < z CL W Z > < Lu M E Cy) 7(3 N tu IL %J tu Q� JUL z OL f4 r-0316 I OF 10 R E c EE aF v,;r . JAN 2 9 Z,53-14. PERIIT COUNT ER OTREET FILE _NE_ 114, NE 114 SEC TION 3 1., TO WNSHIP 2 7 NOR TH, RA NGE 4 EA S Ty W M. BARRIER TREE STALL 81 0`1/0/1 bi Ljj L,_ LA P NTS 0 C14 `4_ 0 b 00 0 z H.L. El' EL 374 EL 370 EL 366 EX. APT BLDG PAVE ASPHALT TR. CURB GRAPHIC SCALE -20 0 10 20 40 (2)DETENTION PIPE 111011 Im SEWER MAIN BENCH MARK: SSMH #103 INV=369.011--�-' I ON 0 CURB CUT EXTEND (IN FEET) 3 1 INCH= 20 FT FIRE SPRKR LINES DOMESTIC WATER LINES JOIN NEW SSMH#102A TO E W/SAD LEr", @ GAS MAIN w'7 BENCH MARK: INVERT OF EX. SSMH#103 AT >> ABOUT 200' NORTH OF SITE ON 76TH AV W; POWER/TELE. /CABLE > / 'AD STRIPING 3QZ.2�, IN 59*40'29" 03/.24 $ I 11 7 Tl� ___jZILTER/CB#4A TS[ z 7w PLANTS kANTS MAILEI X z -D VAUL S 211 D I C G T WTR AROUND P U D PED PUD PED. 3 2" METERS DID C VAS & DDCVAs El Fp Z z Ep- z LIJ Ll- z [P-111 Lj_ PI FP P] FIRE EOR EOR �IR HYDR. r UNIT 513 UNIT 5A LOL _p] UNIT 48 UNIT 4A _p] UNIT 313 UNIT 3A (0 UNIT 28 UNIT 2A' UNIT 113 UNIT 1A -z z HARD LANDSCAP 1-7 LLj 8X10 (TYP) H H. ........... H.L.] ....... ............ L. F LL H.L. _T RLE _Nq H ....... - - ­­ - . ....... 37P,,-- ............. . ............... .................. ............. . ........ S 89-40'29 w 303.26-'- 6' FEIIICE GOES TO 3' @10' FROM R/W LINE 0.45'Face of Conc. qaI1 \L @GAS METER - TYPICAL LOCATION EX. HOUSE CE r C� c) 0 r� to z L 0 C', r I on r (C) (D r + N < F- U) Lij C 0 T @ z 000 in F-3 r M L C-) :2 ry C r ad 0) C b + C� < 0 --t + :qk pr) M d FINISHED GRADE rAPTP1F)r_r P'll TPP WAI 11 T-9 FA 12" STORM MAIN EXTENSION 81 AD EX. HOUSE 232ND ST SW SCALE. 111=20�-011' 'L CB(TYPE1) FOR MAINTENANC E EX. DUPLEX EX. SEWER Al 12" STORM MAIN REALIGNED (D b INV = 369.01 3 PROPOSED IMPERVIOUS AREA 16,980 SF EXISTING IMPERV. = 2800 SF BEGIN PR Fl E 1p 0 @13.5' d/rl PFCP. LN "-w .. 4 F= io 0 �77 Orr z k Ld 9!2,PtVy 151-MAIN 6' DI MAIN —3, itElvc[ JOIN EX. CB - - - — — — — — — — — — — — — ---1 ­11 — rVIC—rikin f�r*j A nr- 3+00 2+00 1+00 r�% frqm? / VE WA "Y' PR " 0 FIL E SCA L E.- HOR.- 1 20 �-O I'- VER T- 1'!:--4' 0 0 F--: 0 UJ ro 0 11 LO :D Uj 0� al cDLO I- 0 u- C) uj:�, CD -4- * 0 Ln ry Ld -,=F- _j rn LL_ + C) nf 0 0 l__ F__ Of U) 0 < ro vm Lq b LLJ 0 < -7 j n 0 Lij 00 M 1 O"Z LU F2 V) (0 %.V :T- 30, 30' z _j ft: > < LLI M 0 2 0 00 L6 x Lij F.H. 00 L0 C� �1_ — — J i(T�7 X SSMH#102 �X. �qMH YDR LINE 0+00 LEGEND: F1 %.A_A�U EXIST SHRUBBRY, 6'HIGH PLUS —0 EVERGREEN TREE CK-4; DECIDUOUS TREE, SIZE SHO WN(DIA) PLANNED PROPERTY CORNER (UNSURVEYED CORNER) X_ 2'REFERENCE POINT TO RIW LINE 0 DOWNSPOUT NEW CONTOUR LINES CLEARING LIMITLINE NEW WATER MAIN OR SERVICE NEW SAN. SEWER MAIN OR SERVICE EX WA TER MA IN OR SER VICE EX. SAN SEWER MAIN OR SERVICE (1) INSTALL 258'—,3,3" N12 PIPE FROM CB#,3 TO' CB#4 PER PRO -FILE & 12" N12 FROM CB#2. CONNECT DOWNSPOUTS & FDN PIPE TO FILTER CBs. (2) CONSTRUCT 268' OF 8" SDR35 PIPE FOR SEWER MAIN EXTENSION FROM EXISTING MAIN TO MANHOLE #2. 6" C-O.s TO BE W/LOCKING LAMPHOLES. SADDLE NE MANHOLE INTO EX. LINE PER DETAIL ON SHT C2/3. INSTALL 3-2 $1 DIA. FIRE SERVICE LINES (BUNDLED) TO LAST 3 DUPLEX TOWNHOMES & 1" LINE TO EACH UNIT AS SHOWN IN PLAN. INSTALL IN DWY TRENCH A 2$' DI DOMESTIC WATER MAIN FROM 2$' MASTER METER & THEN 1" LINE TO EACH UNIT'S INTERNAL METER. EX METER TO BE USED FOR IRRIGATION PURPOSES. IN SEPARATE TRENCH INSTALL 2" POWER COND. FROM POLE TO TRANSF. VAULT, TO HANDHOLE VAULT AND THEN TO EA. UNIT (SECONDARY LINES NOT SHOWN BUT GO TO TYPICAL LOCATION SHOWN (9 CTRLN OF DUPLEXES; ALSO INSTALL 2" TELEPHONE CONDUIT AND TV CABLE CONDUIT TO SEPARATE STUB —UPS & PLACE TEL/TV 12" ABOVE POWER CONDUIT IN SINGLE TRENCH TO EACH UNIT PER SEC. AA SHT C2/3. WITH 1' HORIZ. CLEARANCE FROM PWR/TEL/CABLE CONDUITS INSTALL GAS SERVICE LINES (BUNDLED). GAS SERVICE IS SHOWN SEPARATE HEREON & IN SECTION A—A/C2. (2) PAVE SHADED AREA WITH 2" CLASS B ASPHALT ON 2" OF 5/8"(—) cstc & 4"OF 1 1/4"(—) csbc. ALSO LAY 6" EXTRUDED ASPHALT CURB ALONG NORTH SIDE OF DRIVEWAY (PAINTED YELLOW) AND LAY 8" WIDE CONCRETE NEAR PWR PED FOR MAILBOX INSTALL. a8 LOCATE GAS METERS IN BACK OF PORCH AS SHOWN — TYP. EA UNIT. 9 LOCATE BOXED DOUBLE ELECTRIC METERS IN FRONT AT MARRIAGE LINE — TYP. EA UNIT & FLUSH METERS OR MAKE LESS THAN 12" FROM BLDG. INSTALL TWO STORM FILTERS; A 2 CARTRIDGE C13 AND A 1 CART. CB WITH 12" PVC PIPE FROM EA VAULT TO R/D CBs. SEE SHT 3A DETAIL. WIDEN EXISTING CURB CUT AS SHOWN PER NEW CITY STD E2.26 & REPLACE SOUTHERLY CURB CUT WITH STANDARD SIDEWALK. CONSTRUCT A 4" DI WATER MAIN FROM MAIN TO 2" MASTER METER AS SHOWN AND THEN GO 2" DI DOMESTIC MAIN ALONG DRIVEWAY ALIGNMENT W/1" LINES TEED OFF TO INTERNAL METERING INSIDE UNITS. ADD 1 NEW FIRE HYDRANT & 6" DI SERVICE ACROSS STREET AS SHOWN IN SAME TRENCH ACROSS 76TH WITH 4" D.I. DOMESTIC MAIN. MAIN CONNECT MAY BE 6'$ TAP. TEE W/VALVE. S INSTALL 3 — 2" FIRE SERVICE LINES FROM DETECTOR CHECK VALVES & MINI —METER IN BOXES TO SERVE THE LAST 3 DUPLEXES AS SHOWN. EXTEND 12'$ STORM MAIN WITH 156' — 12" SDR35 PIPE AT 2' FROM CTRLN OF 12'$ PIPE TO INSIDE EDGE OF EX. CONCRETE GUTTER AND WITH 2' COVER AS SHOWN IN 76TH AV PROFILE AND ON SECTION A—A/C2. REROUTE STORM PIPE EXTENSION AROUND NE CURB RETURN AT 232ND ST SW USING A TYPE 1 CATCH BASIN AS SHOWN. 16 EXISTING 8" SEWER MAIN VARIES FROM 14' TO 15' FROM STREET CTRLN. INSTALL 1 C.B.U. MAILBOX AT ENTRANCE NEAR PUD PED PER CITY STD. 1 TRENCH BACKFILL ON 76TH AV TO BE 2 SACK MIX CDF. CDF SHALL BE PLACED BETWEEN BEDDING & BOTTOM OF ASPHALT PAVING. PAVEMENT PATCH SHALL MATCH EX. DEPTH & PLACED IN MAX. 2" LIFTS. PAINT EXTR. CURB YELLOW; ADD "FIRE LANE — NO PARKING" — 12'$ LETTERS, EVERY 50' AND SIGN THE END STALLS TO BE BARRIER FREE. USE SOLID LOCKING COVER TYPE // 54"DIA MH MARKED WRAIN"& W1 LOCKING BOLTS RIM=376.85 SETAT 12- VERTICAL TO CB INVERT 1-33 " DIA N 12 j .0 MAX WTR SURFACE EL 374.52 NOTE I S TRICTOR ELBOW 1 100 YR ORIF= 1. 63 If A T 373.90 t 1.5 DIA MIN. IPE S UPPOR Tn_�_� 2'MIN 10 YR ORIF=1.00"AT370.00 EEI NOTE 2 �_U`,72.00 late 12" CPEP SHEAR GA TE W1 CONTROL ROD FOR CLEANOUTIDRAIN - BEND AS REQ1D INV=372.00 FOR VERTICAL ALIGNMENT WICOVER 0 USE REMOV. INA IERTIGHT COUPLING V PIPE SECTIO - ELBOW VERTICAL TO BE 12" MIN. RES TRIC TOR PL W10RIF, 2. USE ONE YX0.090" GAGE PIPE SUPPORT AS SPECIFIED. A T 3'VER TICAL SPACING MAXIMUM 3. GASKETED BAND TO ALLOW REMOVAL. 4. ALL METAL TO BE CORROSION RESISTANT CB#3 RES TRIC TOR DE7—AIL I r_1 NOT TO SCALE APPROVED FOR MAILBOX LOCATION BY- DATE.- THOMAS SNYDER, POSTMASTER U S POSTAL SERVICE I WIRES: 4/5/2004 APPROVED FOR CONSTRUCTION BY, DA TE.- CITY OF -_E_Dmo]VDS General Notes RECEIVED MAR 2 6 2004 PERMIT COUNTER No. I Revision/Issue I Date rFirm Name and Address ,1A DEAN HOUGH& ASSOCIATES 8918 11THSTNE EVERETT, WA 98205-1407 PHONE 425-335-0262 rProject Name and Address SCL ENTERPRISES TOWNHOMES 23124 76TH AV W EDMONDS, WA 98020 FNTERPRISES, LLC Sheet 76A , FA V W TO INNHOMES A E Date C a NOV. 3, 2003 Scale �; 3] I IN = 20 FEET NE 114, NE 114, SEC TION 3 1, TO WNSHIP 2 7 NOR TH, RA NGE 4 EA S Ty W M General Notes NOTE. - INS TA L L 2 S TORM FIL * TER CBs B Y S TORM WA TER MA NA GEMEN T 2 (OR 1) CA R TRID GE S TEEL UNI T A T L OCA TIONS SHO WN ON SHEE T C 113, THE 2 CA R TRIDGE UNI T A T THE WES T END OF D WY A ND THE I UNI T A T THE EAST END, THE EAST UNIT SHALL BE SMI MODEL CBSFI - L AND WEST TO BE CBSF2. REINFORCING BARS WITH MINIMUM 6" OVERLAP RADAL FLOW 8* OUTLET FOR PERIMETER SLAB—\ CARTRIDGE PIPE STUB (STD) (BY CONTRACTOR) B \ A t— LIFTING EYE (TYP)-- 27-3/4* X 27-3/4*—// SOUD LID GENERAL NOTES: 1.) STORmnLTER BY STORMWATER MANAGEMENT INC.. PORTLAND. OREGON (800-548-4667). 2.) CATCH BASIN MUST BE SET LEVEL 3-) EXTERNAL PIPING AND COUPUNGS TO BE PROVIDED BY OTHERS. x 4.) FLEXIBLE COUPUNG TO BE USED AT INLET & OUTLET. FERNCO OR ENGINEER APPROVED, 5.) STORMFILTER REQUIRES REGULAR MAINTENANCE. REFER TO OPERATION AND MAINTENANCE MANUAL FOR DETAILS. 6.) CATCH BASIN STORMFILTER STRUCTURAL SPECIFICATIONS: LOAD RATING: 20,000 L.B. CONSTRUCTION: 1/4* STEEL PLATE A 950 LB. M UNIT WEIGHT. INLET GRATE. DUCTILE IRON PERIMETER SLAB: REQUIRED INLET GPATE-J B 141� '��INLET PIPE ""�27-3/4' X 27-3/4' STUB (OPTIONQ SOUD UD CATCH BASIN STORMFILTER - PLAN VIEW -ZUJL� -0 ' ..... ..... Q CATCH BASIN STORNIFILTER — SECTION VIEW A —AN RTr— k,2./ W OUTLET PIPE STUB (STD) —CLEANOUT OPENING IN OVERFLOW WEIR The ST0WATEIR MWGMRNT U.S. PATENT No. 15,M2,6U, No a M.M. No. 6.027.M. N.: 6:624,576, AND OTMM U.S. AM POMON PATENTS P=1NG CATCH MIN STORMFILTER — SECTION VIEW NOT TO SCALE co, 01, (n BENCH MARK: SSMH #103 INV-369.0 -ER LINES �/TELE./CABLE R, F- �:- I D I 6' FE JOIN NEW SSMH#102A le-� �- /-N A C-� h A A I K I TO E % ENLA ED EN TRA NCEIU TIL / T'tr'e PLA N E GE N D: 0000 EXIST. SHRUBBR Y, 6'HIGH PLUS —0 EVERGREEN TREE rrg roj DECIDUOJS TREE, SIZE SHO WAI(DIA) PLANNED PROPERTY CORNER (UNSURVE YED CORNER) X- 2'REFERENCE POINT TO R1W LINE 0 DOWNSPOUT NEWCONTOURLINES CLEARINGLIA41TLINE NEW WA TERAIAIN OR SERVICE NEW SAN. S&VER MAIN OR SERVICE — — — — — — — — EX. WATER MAIN OR SERVICE EX SAN. SEWER MAIN OR SERVICE SCALE. If? = 10' CURB CUT E/ LN z-, BENCH MARK: INVERT OF EX. SSMH#103 AT ABOUT 200' NORTH OF SITE ON 76TH AV W; INV 369.01 PROPOSED IMPERVIOUS AREA 16,980 SF EXISTING IMPERV. — 2800 SF APPROVED FOR CONSTRUCTION W-2 DA TE. � � low 9 'ReCE:Iveo WA-� 6 2 004 DERMIT CoUNTER No. I Revision/issue I Date Firm Name and Address DEAN HOUGH & ASSOCIA TES 8918 IITHSTNE EVERETT, WA 98205-1407 PHONE 425-335-0262 Project Name and Address SCL ENTERPRISES TOWNHOMES 23412 76 TH A V W EDMONDS, WA 98020 SUNNTERPRISES, LLC Ileel 76THAVWTOWNHOMES Dote March 3, 2004 Scale 3 1 IN = 40 FEET P3.-IACAD981SCL-76THIC2306bl.DWG REV3125104 ,**ft I EXPIRM CITY OF EDMONDS gEliz, Aff el E D MAR 2 6 2004 PERMIT COUNTER 611 . 191'/ CITY Copy ir:iqli 1111117771 J 5 110 16 11IFFIMM, �/, PLANNED PROPERTY CORNER (UNSURVEYED CORNER) DOWNSPOUT =STOP SIGN LOCATION STOP SIGN AHEAD SHOULDER NARROWS AHE4D FLAGGERLOCATION WARNING SIGN LOCATIONIA END ROAD WORI]K RtCi�E A < ROAD WORK AHEAD > 6d2bw WARNING SIGN: G20-2a lb 0 STANDARD BARREL LOCATION WARNING SIGN: #W20-X not WARNING SIGN: #W20-7a WARNING SIGN: #W20-1 I FEET TRAFFIC CONTROL PLAN = PHASE I SCAE.- 1'�=40'-01 APPROVED AS NOTED BY E NEERING Date: 1A0 MZ—� P, E �c— E I V C- E) JAN 2 9 2004 PERMIT COUNTER —DVTUFT�E� � CITY OF EDMONDS EXPIRES- 4/5/2DO4 N tZZ4 1 0", N No. General Notes V !-:F; aRm- !--.4 ci ca Revision/Issue ':irm Name and Address ZA DE4M HOUGH A ASSOCIA TES 8918 11THSTNE EVERE7 WA 98205-1407 PHONE 425-335-0262 Project Name and Address M: 51 -�E N iffli � � � �: l�: Date Proj *L ENTERPRISES, LL Sheet a' L E N7RI S E SE T HAV NHOME OW '6T Pr7 T 76TH AV TOWNHOMES [Date NOV. 3,2003 1 Scale - X2 I I I = 0 T IN = 50 FEE-T MACAMM-76MMOMMOM I&ZM F� jZ7 '0 LEGEND, C= EXIS T. SHRUBBR Y, O'HIGH FL US EVERGREEN TREE C r--1k Ct�y DECIDUOUS TREESIZESHOWN(DIA) * PLANNED PROPERTY CORNER (UNSURVEYED CORNER) * DOWNSPOUT 4 =STOP SIGN LOCATION S.AHE4D =STOpSIGNAHEAD 9- SH. NARO SHOULDER NARROWS AHEAD w- FLAGGERLOCATION WARNING SIGN LOCATIOAF END ROAD WOR,] WARNING SIGN: G20-2a WARNING SIGN: #W2 —5 #W2 — 5 �RIGHT LANE 0 CLOSED WARNING SIGN: �W20-4 HEAD IWARNING SIGN: W12 — 401R STANDARD CONE LOCATION WARNING SIGN: #W20-7a ROAD WORK WARNING SIGN: #W20-1 <AHEA>D F= I FEET MP Ap R ( MKIM F ROAD KA General Notes No. I Revision/Issue I Date Project Name and Address SCL ENTERPRISES TOWNHOMES 23124 76TH AV W EDMONDS, WAS0020 J AAN, 2 "1 2-39i; PF-R,i,.';T COUNJITEIFR III U roffig, llow��ffiw M-1 oll ih1JE 1/4j NE 1/4,, SECTION 31, TOWNSHIP 27 NORTH, RANGE 4 EAST, W.M. 230th ST SW FOUND REBAR w/ NO CAP--\ ��l FOUND I.P. 0.1- SOUTH N 89*40'29" E 303.24' C1 2 Heavy Br.-ush Black 196.06' Berries w/­Sr-na­ll M12" F24" r n 0 <, F26" F24 Frame C,4 '. House (a It F1 8" 0 Yv�` S c r u b Trees 1 #23124 b 00 F18" FF 380.25 0 z -s D14" M .,F18" Face of 28.6' J_ ., , M 6 10" �14 Conc. Wall Al2" D6-8� FOUND LO.45' S 89*4029" W 303.26' CHENOWETH REBAR RECORDER'S CERTIFICATE ................... filed for record this ........... day of .......... 20 ....... at ...... M. in book .......... of ........ at page .......... at the request of . .... ... ....... . M gr u pt. of ecor j s SOUTH LINE TRACI' 16---� 234th ST SW Q W 4c 30' BRASS DISK (TYP) NORTH LINE OF Bench Mark SOUTH 195 FEET - Elev=375.65 i 3*7 )(—EXISTING TK IN LEAD �-3' R.P. -tF Ex. AFN 10' ISewer Easement 2378289 10' Blacktop Driveway 101.5' U F9" �Fl F24" CP 1710" (3 U_ 09 LIT I F1 01, d 0 CL R1 2 C9 0 (D b 0 F _1 Y VV_ F24- co M 0 -4- 51 Xq: 001 0 B8- 10" jn z 3 7 Fl 196.00' 3' R. P. —SET PK NAIL SURVEYOR'S CERTIFICATE THIS MAP CORRECTLY REPRESENTS A SURVEY MADE BY ME OR UNDER MY DIRECTION IN CONFORMANCE WITH THE REQUIREMENTS OF THE SURVEYgECORDING ACT AT- THE REQUEST OF (;0-5*r0*4 r%A&P- IN tzp-r OF CERTIFICATE NO. U? a) 1-0 C� � �2 —MON IN CASE —EXISTING TK IN LEAD LEGAL -DESCRIPTION NORTH 80 FEET OF SOUTH 195 FEET OF TRACT 16, SKELTON'S LAKE McALEER 5 ACRE TRACTS, ACCORDING TO THE PLAT THEREOF, RECORDED IN VOLUME 6 OF PLATS, PAGE 21, RECORDS OF SNOHOMISH COUNTY. SITUATE IN THE COUNTY OF SNOHOMISH, STATE OF WASHINGTON. EXCEPTIONS EASEMENT AND THE TERMS AND CONDITIONS THEREOF: Purpose: Sewer Line Area Affected: East 10 Feet Recorded: March 20, 1975 Recording Number: 2378289 NOTES 1. MONS. VISITED APRIL 24, 1999 & SEPT 12, 2000. 2. THIS FIELD TRAVERSE SURVEY WAS PERFORMED WITH A 6—SECOND THEODOLITE AND ELECTRONIC MEASURING UNIT. ACCURACY STANDARD IS WAC 332-130-090. 3. THIS SURVEY BASED ON DATA FROM CITY OF EDMONDS SHORT PLAT #S92-262, REC #9305260729 & SURVEYS IN FLD 13K 116, PG 55 & FLD BK 139, PG 117 13Y A. CHENOWETH, PLS. 4. SET BENCH MARK: TACK IN LEAD w/ DISC 0 NE CORNER ELEV: 375.65 5. ELEVATION DATA: SEWER MANHOLE #103, IE 369.01 A�*N Mo MERIDIAN — CITY OF EDMONDS SP #S92-262 0 SET TK IN LEAD w/ DISC (;5' R.P.) M SET 2"xV STAKE & TACK R Birch P Apple C Cherry S Sequoia D Cedar T Hawthorne Fir A Alder H Hernlock J Japanese Mople L Holly M Maple pECEFVF.D NOV 13 2003 DEVELOPMENT SERVICES CTR. CITY OF EDMONDS SURVEY FOR: EXACTA SURVEYIN"U" SERVICE LAURENCE F. DIXON PILS Gas ton Enterprises 20351 Greenwood Ave N 12304 31ST AVENUE NE (13 Shoreline, WA 98133 SEATTLE, WA 98125 (206) 365-0670 JOB 99042 DRAWN: DATE: SCALE: Ex IRES OL HMM Sept. 20, .2000 1 30' Nwmm�v NOV 13 2003 0EVEL2PMENT SERVICES CTR. CITY OF EDMONDS S��, � . I TRE'E"I" FILE I W4,00401x, "'I'M 'A M"NIONNY, f iT1_m3WZFj =kT1_m9WZFj AEL44A !ftbAfrAIAMLON�ArAl FJ F��F�A KL-"_4b" 1FA FA y . IV/. BARRIER TREE STALL 81 OMNI 0 z LLJ LL_ PLANTS (D 0 0 00 0 �7 H. L. I 2 w n 0 0 EX. APT BLDG PAVE ASPHALT - XTR.I CURB #4 Q)DETENTION PIPE n2 SEWER MAIN )9�WA7F GRAPHIC SCALE B"'END: -20 0 10 20 40 General Notes IN ENEEM I 0000 EXIST SHRUBBRY, 6' HIGH PLUS BENCH MARK: SSMH #103 INV=369.01---' I ME ME OEM I 13 CURB CUT EXTEND (IN FEET) 0 EVERGREEN TREE I INCH= 20 FT CK FIRE SP13KR LINES -<u4Tr_- JOIN NEW SSMH#102A TO EX. W/SAD)LEr-" DECIDUOUS TREE, SIZE SHOWN(DIA) 4 DOMESTIC WATER LINESfe4VAff_11_ PLANNED PROPERTY CORNER 1_1�)5 POWER /TELE. /CABLE @ GAS MAIN L BENCH MARK: INVERT OF EX. SSMH#103 AT 0 (UNSURVEYED CORNER) (9 STRIPING 43 ABOUT 200' NORTH OF SITE ON 76TH AV W; X_ 2'REFERENCE POINT TO RIW LINE IN V ju�.0 1 0 DOWNSPOUT 0 9 910 n-Z f)A" -1 _­ - tlAkl�� 11� �� -7# 1 Ir-ml- F..p. 30 PROPOSED IMPFR inHq ARF = 1 R qRn qF NEW CONTOUR LINES 1,4 (D ZI -t U /_ Z7 - - S� - M �PUID 'p- VAULTS���� ILTER�l CB#4A 2" DI I R AROUND PUD PED. METERS!, & DDCVAs FIRE HYDR. 0 UNIT 513 UNIT 5A UNIT 4A UNIT 2 A UNIT 113 UNIT 1A A HARD LAND,,. NCAPE 8X1O (TYP) NMI 20", S 89040'29" W 303.26' 6' FIEI�IICE GOES TO 3' @10' FROM R/W LINE k EL--3-7-8--- _F_r2�� �27O.. EL 374 EL 370 _075 Fuut-1 )i C @GAS METER TYPICAL, LOCATION 12" STORM MAIN EXTENSION 8 AD EX. HOUSE z _j c� C-) 0 r- V-) z L 110 V) Ljj (14 0 n r + Lj_ 04 < W V) Ld c 0 @ z < ()00 3: 't V) (.3 r LLJ r) < ry c) 0 0 f W rry coo) 01w + N LL_ (c) c� 0 + V) C) EL 366 1 3+00 2 CARTRIDGE FILTER VA A10 w w V) w a_ to z :D 0 FINISHED GRADE ULT-2 EA. EX. HOUSE ST SW SCALE.- lrf=.20�-O" R FLR 378.1 V) V) 0 K) 06 h C14 r*z LU 0 z LU CD 3 _'L CB(TYPE1) FOR MAINTENANCE EX. DUPLEX EX. SEWER �,Al 12" STORM MAIN REALIGNED 015) EXISTING GRADE 1—.0% SLOPE elf LLj i9_1 LIJ V) LLJ 0 M C) n R W z Z) r- 0 tA JOIN EX. EXISTING IMPERV. = 2800 SF CLEARING LIMITLINE BEGIN PR6F I _E @13.5' d/11 PFCP. LN NEW WA TER MAIN OR SERVICE 0 NEW SAN. SEWER MAIN OR SERVICE F=-- z j�651L, G. EX. WA TER MAIN OR SERVICE LIJ EX. SAN SEWER MAIN OR SERVICE Wl&"5 Lrm,j. 2" P611 K. MAft- go DI MAIN 611 _j or IIDIE RKU / p, Nwjw �jl ut:Zi /F_3�� wo CR w LU @ INSTALL 258'—,33" N12 PIPE FROM CB#3 TO CB#4 PER PROFILE & 12" oc o uj CD 0 r N12 FROM CB#2. CONNECT DOWNSPOUTS & 1._DN PIPE TO FILTER CBs. < U,3 0 0-j ,d 0 "t Q CONSTRUCT 268' OF 8" SDR35 PIPE FOR -SEWER MAIN EXTENSION FROM < 00 z 0 w EXISTING MAIN TO MANHOLE #2. 6 C.O.s TO BE W/LOCKING LAMPHOLES. Mw 0 w wl V) < SADDLE NE MANHOLE INTO EX. LINE PER DETAIL ON SHT C2/3. z '31 INSTALL 3-2 to DIA. FIRE SERVICE LINES (BUNDLED) TO LAST 3 DUPLEX V) (0 1 TOWNHOMES & 1" LINE TO EACH UNIT AS -SHOWN IN PLAN. a- b INSTALL IN DWY TRENCH A 2" DI DOMEST IC WATER MAIN FROM 2" A --1 0, MASTER METER & THEN 1" LINE TO EACH UNIT'S INTERNAL METER. EX —3' 1 C 300 METER TO BE USED FOR IRRIGAT I I I ON PURPOSES. IN SEPARATE TRENCH INSTALL 2 POWER COND. FROM POLE TO TRANSF. 5 VAULT, TO HANDHOLE VAULT AND THEN TO EA. UNIT (SECONDARY LINES D z 3: NOT SHOWN BUT GO TO TYPICAL LOCATION SHOWN (9 CTRLN OF _j DUPLEXES; ALSO INSTALL 2" TELEPHONE CONDUIT AND TV CABLE > of CONDUIT TO SEPARATE STUB —UPS & PLACE TEL/TV 12 ABOVE POWER CONDUIT IN SINGLE TRENCH TO EACH UNIT PER SEC. AA SHT C2/3. In < WITH 1' HORIZ. CLEARANCE FROM PWR/TEL/CABLE CONDUITS INSTALL GAS L SERVICE LINES (BUNDLED). GAS SERVICE IS SHOWN SEPARATE HEREON & M M -7 14 f, IN SECTION A—A/C2. M LIJ of 04 V) �0 0 1 PAVE SHADED AREA WITH 2 CLASS B ASPHALT ON 2 OF 5/8"(-) cStc 0 'Do 4"OF 1 1/4"(—) csbc. ALSO LAY 6" EXTRUDED ASPHALT CURB ALONG x NORTH SIDE OF DRIVEWAY (PAINTED YELLOW) AND LAY 8" WIDE Ld CONCRETE NEAR PWR PED FOR MAILBOX INS TALL. C13 F.H. 8 LOCATE GAS METERS IN BACK OF PORCH -AS SHOWN — TYP. EA UNIT. 00 _4 CTRIC METERS...,'IN FRONT AT MARRIAGE LINE — LO 39 LOCATE BOXED DOUBLE ELE ' LJ c� TYP. EA UNIT & FLUSH METERS OR MAKE UESS THAN 12" FROM BLDG. INSTALL TWO STORM FILTERS; A 2 CARTRIDG E CB AND A 1 CART., CI3 WIT 1 V(- IPF P-PnKA FA VAHI T Tn A-, r P17 q W T ­� A F All WIDEN EXISTING CURB CUT AS SHOWN PER !,,JEW CITY STID E2.26 & X SSMH#102 REPLACE SOUTHERLY CURB CUT WITH STAND,ARD SIDEWALK. 0 fl r)) CONSTRUCT A 4" DI WATER MAIN FROM MAII�01, TO 2" MASTER METER AS SHOWN AND THEN GO 2" DI DOMESTIC MAIN 1' 'ALONG DRIVEWAY ALIGNMENT X. '3DMH W/1 it LINES TEE'D OFF TO INTERNAL METERIN',G INSIDE UNITS. ADD 1 NEW FIRE HYDRANT & 6" DI SERVICE ACROSS STREET AS SHOWN IN SAME TRENCH ACROSS 76TH WITH 4" D.I. -DOMESTIC MAIN. MAIN CONNECT MAY BE 6 It TAP. TEE W/VALVE. S INSTALL 3 — 2" FIRE SER'VICE ' LINES FROM DETECTOR CHECK VALVES & MINI —METER IN BOXES TO SERVE THE LAST 3 DUPLEXES AS SHOWN. EXTEND 12" STORM MAIN WITH 156' — 12" SDR,35 PIPE AT 2' FROM Z CTRLN OF 12" PIPE TO INSIDE EDGE OF EX. CONCRETE GUTTER AND WITH 0 r- 2' COVER AS SHOWN IN 76TH AV PROFILE AND ON SECTION A—A/C2. 1-: NO Ui 0 0 -q- M cc� if r- W,�j . REROUTE STORM PIPE EXTENSION AROUND NE CURB RETURN AT 232ND d- W 14 LLJ (0 Ld r [L Z to V) —c n 00 ST SW USING A TYPE 1 CATCH BASIN AS SHOWN. 1110 0- - 11 — $9 0 wcq IP w 6 EXISTING 8 SEWER MAIN VARIES FROM 14' TO 15' FROM STREET CTRLN. 'on :2 — (d 0- _cD - r- 11 LO r,- (60 ry r,- V) INSTALL 1 C.B.U. MAILBOX AT ENTRANCE NEAR PUD PED PER CITY STD. 0 J_ CD:2 Z 11 Ld 0 z TRENCH BACKFILL ON 76TH AV TO BE 2 SACK MIX CDF. CDF SHALL BE po b- < rl- L� L-1' r- x T"ry L 0 to PLACED BETWEEN BEDDING & BOTTOM OF ASPHALT PAVING. PAVEMENT w 11 3:t n r- 11 p W(o M > PATCH SHALL MATCH EX. DEPTH & PLACED IN MAX. 2" LIFTS. 0 Lri — 0 W -J Qf U) r, cy- < Vx rn z < PAINT EXTR. CURB YELLOW; ADD "FIRE LANE — NO PARKING" — 12" < 0 (0 0 Ln 0( LETTERS, EVERY 50' AND SIGN THE END ST'i"! LS TO BE BARRIER FREE. c t 1\ - r*- (0 c cy- :—*: 1-- c Uj , -r z -j r- Z Z_- :2 _j USE SOLID LOCKING COVER 0 Q LL- 4 rn 00 N U) 0� r4lz c * En 0 MA RKED "DRA IN to & W1 L OCKING B OL TS MM r-� M 0 TYPE /154 DIA MH + Lq 'u, 0 r- + M 0 RIM=376.85 l- C\l 0,� 0 + 0� U) + of 0 + TAT 12"VERTICAL TO CBINVERT 0 91 11 0< 1-" 1 1-33 to DIA N 12 _j 0 M 0 (n SEE NOTE I MAX WTR SURFACE EL 374. 0- U) 1 100 YR ORIF=1.63"AT373.90 'hECEIVED RESTRICTOR ELBO 00 d Ld 1. 5 DIA MIN. 10 YR ORIF=1.00"AT370.00 APR 0 - 9:.2004 3: X -1 2'MIN 0 Uj PIPESUPPORT7,:_;�_f - a_ co SEE NOTE2 r1_JNY__=,372.00 PERMIT 60UNTER x 1211 CPEP SHEAR GATE W1 CONTROL ROD FOR bi 0 CLEANOUTIDRAIN - BEND AS REQD 1 1/2" GAS SERVICE`­T0--Att-bN+T--S— SEPARATED BY 12" FROM PWR,/TEL/TV DROP I.E. 369.3 INV= 372. 00 FOR VERTICAL ALIGNMEN T WICO VER SEE NOTE 3 REMOV. WATERTIGHTCOUPLING VPIPESECTIO EL B 0 W VER TICA L TO BE 12 or MIN. M RESTRICTOR PL W10RIF 2. USE ONE 3'X0.090" GAGE PIPE SUPPORT AS SPECIFIED. AT 3'VER TICA L SPACING MAXIMUM 3. GASKETED BAND TO ALLOW REMOVAL. 4. ALL METAL TO BE CORROSION RESISTANT 6' FIRE FIYDR LINE CB#3 RES TRIC TOR DETAUL F FORE ;/�5/2004 NOT TO SCALE APPROVED FOR MAILBOX L OCA TION APPR R CONSTRUCTION 0+00 DA TE4- BY- DATE: BY 2_/0 4 THOMAS SNYDER, POSTMASTER U S POSTAL, SERVICE CITY OF EDMONDS No. I Revision/Issue I Date Firm Name and Address DEAN HOUGH& ASSOCIATES 8918 11THSTNE EVERETT, WA 98205-1407 PHONE 425-335-0262 - 10 rproject Name and Address SCL ENTERPRISES TOWNHOMES 23124 76TH AV W ' EDMONDS, WA 98020 SWgNTERPRISES, LLC "ee' 76 TH A V W TO WNHOMES Date c NOV. 3,2003 Q-1. 3 P3.-IACAD981SCL-76THIC2,106bi.DWO REV. 312& 3125104 HIP 27 NORTH, RANGE 4 EAST, W.M. NE114,NE114ySECTION31.f TOWNS . L E GEN D: General Notes M �W w z Ld LL_ PLANTS 1-0 EX. APT BLDG (2)PAVE ASPHALT - SEE WCRK DES . CRIP. - SHT C1/3 r-EXTR. CURBI 30Z.24- N L39*4(1"29" 303.24 ........... — ------ M BENCH MARK: SSMH #103 INV=369.0 NEW SSMH#10 6' FENCE w w I I POR 0 w p P w P 00 z z w P u P P P PU OR Z 2 qA U N IT JA LI ao V) P Rco� I <Z 1 1 UNI 1A W LIj P LI_ z o p U- p P UNIT 113 w to UNIT 2B UNIT 2A Mw A C) w UNIT 38 UNIT 3A': w UNIT 513 UNIT 5A UNIT 413 UNIT 4 V) z uj HARD HARD LANDKAPE W LLJ Z IL 8X1O w 8xi 0 (TYP) U- H.L. . . .... . .... U) I-_ U) 0 z 04 n 04 0 z w x z ct c v c c 4 c EL 376 EL 372 EL 368 EL 364 0.45'Face of C EX. HOUSE 00 (0 Lq CD w z cr) z (D 0 to ijt� 0!: F- 11 —c 0 z w < 0 W :) cc 0111 c 14 r- u 1: z 0 Lq (0 co it :22 :2 X — C U) (I 00 1_� C14 a-)0c w L1J z _3 z V) V) 0 V) x x Ld w + Rd 0 0c), 00 04 cy) G)cy) C14 0 �_r_ uri clic� 0 00 60 f- 0+00; !�j N S 89*40129 w 303.26" c1q co C3 LLI LO 06 I", 10% %­o co TO JOIN IS BEHIND CB#1 0 -EX. GRADE AT ROAD/R/W CTRLN OFPo 232ND ST. SW Ain, SCALE., I vr=20�-011 q V) z w x 0 0 Ln w z C) z LLI 0- 0 w 0-1 X Ld V) 0 Lri Lij 0 5; + 5 76TH AV W (y_ w V) cy_ 0 CINI CID @ 1.40% SLOPE 74' Pvc-SDR35 npnp IF= H.L. ............... 777N ............. ........... * ....................... I W FFNCF 3' FEN EX. DUPLEX EX. HOUSE 11 0 11 I'al :) 0 n z x z _j R� 0 (o uj r, n 1`0 11 w FT U- 0 N C6 r- n U- 0 EE q: LO uj z n_ __j :2 ry -i >- _�, -co i of ui 0 W_ LO r- @ z ui 03 In r-: 00 V) V) cr F- () N M 0 z J n_ z 0 Ui 0) V) V) + Lr) + , 0': 0 _ww 'Oft 1+00 2+ Of mmrLJ AV W PROFIL E_ SCALE. HOR: 1"=20�-O",' VERT, V�4' Fk� on 30' BEGIN PR I E @ @1 .5 13.5' P P. LN 0 z u Lj i Q_ (0 D 0 0 0 0M CK 0 :2 L) Do 0 Ld z Fe 30' z f-xJ 30 j_ 0 IN, > < U) 00 w 0 co Ln 0i r1_ V,kEX �SMH#102 MAVIN IMP 000b EXIST SHRUBBRY, 6'HIGH PLUS EvERGREEN TREE D . ECIDUOUS TREE, SIZE SHOWN(DIA) GRAPHIC SCALE PLANNED PROPERTY CORNER -20 0 10 20 40 (UNSURVEYED CORNER) I= 2'REFERENCE POINT TO Rj`W LINE (IN F�ET) FT. 0 DOWNSPOUT I INCH 20 NEWCONTOURLINES CLEARING LIMIT LINE —NEW W. NEW wA TER MAIN OR SERVICE —NEW S.S. NEW SAN. SEWER MAIN OR SERVICE EX W. EX. WATER MAIN OR SERVICE EX. S.S. EX. SAN. SEWER MAIN OR SERVICE 0 CHAIN LINK FENCE WOOD FENCE 13 ry U) V) LLJ 1-- 0 C) z ry I— Of Lij x Lli ry _j ry uj I-_ LLJ M LLJ _j 1-- U) V) < Z 0 :D LLJ 0 :3 (D -,7 ly- Lij I LLJ 3: a_ I— Lij V) ry Lli < 1.1i 1 z Lu (y 3: z y Y ry (Y- C) n . § Lij 0 LLJ cA U) I= n V) LL_ ry Z ry LiJ Ljj V) U) C) 0 ry Lij C) < Lii LLJ Lij 1, F--:2 > C-D Lij 0 Z C) n Ld 0 011- c) < V) V) CY C) -CA Ld < LL_ V) LLJ 0 n — (2- LL_ . . . . . . . . . . . . . . . . . . . . x n Zn C) 011 Li 0 < > 0-- Lij C14 0 Q_ 0 C) 00 C) t.- 0 cn 0 ry LU z c4 In Ln In 0000 0 0- c) c-4 r,� cd �6 o6 6 r- < 000 0 T_ I I + C3 L1_ + + + + + + + + + + TOWNHOME UNIT 3B 0 co 0) 000 0 0 00000 0 C3 . co 0 + DOI 0 + 40p 1 GAR FLR 378.1 0 ()PE___ 4% IV AX CROSS SLOPE SEC7 iON A A SCALE.'. HORIZ-7 10' JOIN MH PER ST E6.1 1. POURED 6" SLAB UNDER EX. MAIN 2. INSTALL MANHOLE OVER SLAB 3. POUR CONCR. SHELF PER STD E46APOUR SHELF PER ST E6.1 4. BREAK OUT EXPOSED TOP HALF 06F MAIN POUR '�REMOVE AFTER ) "A-4" DROP BOWL "A-6" DROP BOWL —jz.uu F—U.vu — # - I "A-6" DROP BOWL WITH OPTIONAL FORCE LINE HOOD (ATTACHES WITH 4 S.S. BOLTS, FITS A-4 & A-6) THE"A-4" BOWL WILL SERVICE UP THROUGH FULL 6" INLETS. THE"A-6" BOWL WILL SERVICE UP THROUGH RELINER I FULL 8" INLET. CAN BE USED FOR 10" AND 12" INLET 53 Mr. ARCHER ROAD, LYME, CT. 06371 MODERATE FLOWS. ALL SIZES ARE FOR RETROFIT OR poo) 508-6001 FAX. (860)434-3195 EW CONSTRUCTION. FABRICATED IN MARINE GRADE DESCRIPTION =DATESCALE I FIBERGLASS AND FINISHED IN BRIGHT WHITE GEL A-4 & A-6 08/08100 NONE COAT. U.S. PAT. # 6074130 DROPBOWLS DRAWING NUMBER ADDITIONAL PATENTS PENDING ADB NEW 8 1 _POURED'SLAB Revisio n;4ssue MANHOLE PIPE [ Flrm Name and Address ND m and Add 'es 9 DEAN HOUGH & ASSOCIATES 8918 14THSTNE EVERETT, WA 98205-1407 P P 0 HONE 425-335-0262 Date PrDject Name and Address SCL ENTERPRISES TOWNHOMES M =%_," A 23124 76THAVW AAM119 - ./TANDARD CONC. CHANNEL MAR 1I 120 EDMONDS, WA 98020 PERMIT COUI D r) /D ROP LINER TOP VIEW —SEE DETAIL AT LEFT — USE TYPE A6 LINER 00 D'DLE ur-%E, Sheet TAIL ggegNTERPRISES LLC NOT TO SCALE 76 TH A V W TO i�Vka_6/14ES Date NOV. 3,2003 UCTI N APPR FOR CONSTRUCTI 1 IN 20 FEET DATE: BY: p3.lACAD,981SCL.76THlc2306a2.DWG REV. 31VM CITY OF NDMONDS mork-11JEA-FAIIA General Notes SILT 1ENCE/CLEARANCE LINE ­ EX. APT BLDG 1 DETEN11ON PIFE 2 SEWE R MAIN STALL -7 f-CB#4 PLANTS 10 ILTES CB#4A 10 FO I P FP UNIT 59 UNIT 6A FHL I _A-7 EX. HOUSE H.L *A P%9r%A I, It J BENCH MARK:. SSMH #103 INV=369.01--- JOIN NEW SSMH#102A TO E). W, 20' x 50' CONSTRUCTION ENTRANCE rc fa PER DETAIL HEREON I P] IP Ep E di UNIT 2A UNIT 4B I UNIT 4;11 NIT B 11 UNIT 3q; I IbPUNIT 2 1 1 t 1w I b 01' 1pi5, ��Aoh H.L. I M S 890. H.L. H.L. I W 303.26 32ND ST SW EX. HOUSE GRADih�GIES SCALE: 1'=20'-O' MIN. F .v4rl Ir-ir PROVIDE FULL VADTH OF "Y EGRESSAREA CONTRACTOR SHALL MAINTAIN TEMPORARY CONSTRUCTION ENTRANCE DURING THE CONSTRUCTION PERIOD, CITY INSPECTION REQUIRED ON ALL EROSION CONTRO MEASURES BEFORE WORK CAN BEGIN, Ou;�-;- E-0 MON Nod;" STANDAFM DE M= IM11111111111111 DAM 7/24/M I gem NTS L P POIR UNIT 113 UNIt 1A H.L. EX. DUPLEX 7/8' WASHED RUCK LL I.. 3 BEGIN PR F E @13.5, 1 P 5/0 0 0 0 -t CO 0 0 Z 30, 30, > < (_0 0 C! 00 EX E SMH#1 02 0 CATCH BASIN `J� A tc)(6 V PLACE FILTER FABRIC BETWEEN FRAME -` `4 AND GRATE. PLACE 7/8' WASHED GRAVEL 3-4 INCHES HIGH AROUND CATCH BASIN TO FILTER WATER. STRAW BALES MAY BE USED IN CERTAIN CIRCUMSTANCES (SEE DETAIL E111) UPON APPROVAL OF CITY ENGINEER OR HIS REPRESENTATIVE, THIS APPLICATION SHALL BE MAINTAINED AT ALL TIMES DURING CONTRUCTION PERIOD. A. ESC Minimum Requirements. All activities necessitating a clearing or grading permit and all utilMf priolects consWng of more 13. ESC Minimum Requirement - Storm Drain Inlet Protection. All storm drain Inlets made operable during construction shall be then 500 lineal feet of trench excavation shall be required to control erosion sediment during construction and to pennanently protected so that storm water runoff shall not enter the conveyance system without first being filtered or otherwise treated to stabilize exposed soll resulting from construction. Projects Involving a crlilcaO area may also be required to comply with any remove sediment. combination of the ESC minimum requirements. Compliance will be demonstrated through the Implementation of an approved ESC plan. Guidelines for pireparing ESC plans are provided In the manual. The plan must address the following requirements: 14. ESC Minimum Requirement - Removal of Temporary BMPs. All temporary erosion and sediment control BMPs shall be removed within 30 days after final site stabilization Is achieved or after the temporary BMPs are no longer needed. Trapped 1. ESC minimum Requirement - Construction Access Routs. Construction vehicle access shall be, whenever practical, limited to sediment shall be removed or stabilized on she. Disturbed soll areas resulting from removel shall be permanently stabilized. one routs. Access points shall be stabilized with quarry spalls or crushed rock to minimize the tracking of sediment onto public reads. 9 sediment Is transported onto a road surface, the roads shall be cleaned thromughly at the end of each day. Sediment 15. Erosion and Sediment Control Requirement - Dewatedng Construction Sftss. Domtedng systems shall discharge Into a shall be removed from roads by shoveling or sweeping and be transported to a controlled sediment disposal area within 24 hours. sediment tmp or sediment pond. C P. Street washing shall be allowed only after sediment Is removed In this manner. 16. Erosion and sediment Control Requirement - Control of Pollutants other than Sediment on Ckinstruction sites. All pollutants 2. ESC Minimum Requirement - Stabilization of exposed areas. All soils exposed by land disturbing activities shall be stabilized other then sediment that occur on site during construction shall be handled and dlsposed of In a manner that does not cause by suitable application of BMPs, including, but not limited to, sod, hydroseeding, or other vegetation, plastic covering, or mulching. contamination of storm water. All BMPs shall be selected, designed and maintained In acowdence with the manual. The exposed soils shall be stabilized somirding to an approved timetable. (TypiceIV, no soils shall remain wposed Ibir more than two days from October I thirough 17. Erosion and Sediment Control Requirement - Financial Usbility. Parkffnance bonding, or other appropriate financial April 30 and no more then seven days from May I through September 30). Instruments, shall be required for all projects to ensure compliance whh the approved erosion and sediment control plan. 3. ESC Minimum REquirement - Protection of Adjacent Properties. Adjacent properties shall be protected from sediment deposition by appropriate use of vegetative buffer strips, sediment barriers or fifters, dikes or mulching, or by a combination of CONSTRUMON SEQUENCE these measures and other appropriate BMPs. 1 . This construction sequence is to be used as a guideline. Conditions may 4. ESC Minimum Requirement - Maintenance. All erosion and sediment control BMPs shall be requiady Inspected and require changes in the timing of work. Changes shall be discussed with and maintained by the owner to ensure continued perrormance of their Intended function. All maintenance and repair shall be approved by the City inspector and owner. conducted In accordance with the manual. 5. ESC Minimum Requirement - Other 8MPs. As required by the city, other appropriate BMPs to mitigate the efkKft of Increased 2. Arrange and attend pre -construction meeting with City of Edmonds . runoff shall be applied. inspector. Call the Engineering inspection line (425-771-0220, ext. 1326) 24 hours in advance to schedule inspections and to set up a preconstruction 6. Erosion and Sediment Control Requirement - Underground Why Construction. The construction of underground utility lines meeting. shall specifically address the following: a. erosion control fbr excavated and stoftIled materials; 3. Flag right -of lines, property line I s and clearing limits as indicated on the plan. b. The placement of excavated material where consistent with safety and space consIderations shall be placed an the uphill side 4. Install silt fences and construction en.trance..,,per plan. All TESC iterns are of trenches; to be checked daily during the winter construction seas�ori. Any stockpiles a re. c. Trench dowatering.systams (must discharge Into sediment traps, sediment ponds, or other acceptable means); to be covered. if left for more than 2 days and rain is expected. All site d. Trackingend spilling of materials on streets due to hauling; disturbance is to stop during rain and all TESC items are to be checked, and wat r to pass :shall be repaired m.onitored. Any items allowing silt laden e e. Dally cleanup and street maintenance. immediately. Any dusty conditions' found. during co'n.stru.ction shall be. control.led with *use* of water. 7AddMonal ESC Minimum Requirements for Larger Developments. All now development and redevelopment that Includes land disturbing activities of greater than, or equal to, one acre In addition to meeting the minimum requirements set fbrth above shell comply with ESC requirements listed below: 5. Clear & grub to clearing limits, in this case the whole site. 8. ESC Minimum Requirement - Delineate Clearing and easement limb. In the field, mark clearing limb and/or any easements, 6. Rough grade access driveway. setbacks, sensitiveldritical area and the buffem, tree and drainage courses. 9. ESC Minimum Requirement - Sediment Trapping. Prior to leaving the site, stonn water runoff shall pass through a sediment 7. Install storm drainage, detention pipe, water quality features and other pond or sediment trap, or other appropriate BMPs- Sediment ponds and traps, perimeter dikes, sediment barriers, and other utilities. BMPs Intended to trap sediment on -she shall be constructed as a first step In grading. Them BMPs shall be functional before land disturbing activities take place. Earthen sbuctures, such as dams, dikes, and diversions shall be seWed and mulched 8. Complete road construction. according to an approved timetable. 10. ESC Minimum Requirement - Cut and fill slopes. Cut and fill slopos shall be designed and constructed In a manner that will 9. Hydroseed disturbed land surfaces. Ecomat may be necessary for slopes minimize enoslon. In addition, slopes shall be stablitzed In acoordan�) with ESC Requirement No. 2. 3:1 and greater during the winter construction -3eason. 11. ESC Minumurn Requirement - Controlling Off-slto Erosion. Propsirlies and water ways downstream Ilrom development aftes 10. Clean storm drainage system and place into operation. shall be protected from erosion due to Increase In the volume, velocity, and peak flow rate of storrm water runoff from the project 11. Remove remaining T.E.S.C. structures after site has been ..stabilized and site. approved by the City Inspector. 12. ESC Minimum Requirement - Stabilization of Temporary Conveyanos Channels and Outlets. All temporary on -sits T.E.S.C. PLAN NOTES conveyance channels shall be designed, constructed and stabilized to plrevent owslon from the expected velocity of flow from a two-year, 24-hour frequency stonn for the developed condition. Stabilization adequate to prevent erosion of cuffels, adjacent stream banks, slopes and downstream machos shall be provided at the outlets of all conveyance systems. ALL SITE DISCHARGE MUST MEET WATER POLLUTION CONTROL ORDINANCE CHAPTER 7-53 SCC (5 NTU MAX). IF ANY SILT LADEN WATER IS OBSERVED AT ANY TIME, PROJECT ENGINEER SHALL BE NOTIFIED IMMEDIATELY FOR REVISED OR ADDITIONAL MEASURES. FILTER FABRIC SECURED TO r X r 14 CLk WIRE FABRIC EQUAL 25' LOCKING LID --,"WITH THE WORD *SEWER" ON IT (EAST JOR15AN IRON WORKS CO.) e OR 5" CONC RISERS (MODEL #: 00370084) rXrWOODOR EQUIVALENT �MIN.- MAX HGT- 18") �`OUT AND PROVIDE SMOOTH FINISH INSIDE AND OUT 89- 2& Li FUM Or riNtOMM ORMIN MTMFAMWFMMCINIMBLVWACF- FILTER FABRIC MATERIAL IN CONTINOUS ROLLS, USE STAPLES OR WIRE RINIS TO ATTACH FABRIC TO WIRE. P6LYPROPYLF.NE SAFETY STEP 120 O.C. (TYP) ELMOV. 4 ECCENTRIC PRECAST CONE PRECAST SECTIONS MESH SUPPORT FE4,E o` 4" MIN. THICKNESS �u VIRE To S UPPORT FILTER FAWIC. SAND COLLAR 48" *r 54* =HOLE FRAME AND S COVER Zo N 0 T E- W BURY BOTTOM OF FILT ER I LOCATE MH LID OUTSIDE MATERIAL 8' TO 12. THE WHEEL PATH OF THE 6' MAX. TRAVEL LANE. 2. BASE REINFORCING SHALL BE #4 REBAR AT 12 D.C. CONSTRUCT 21 X 2' WOOD POSTS OR BOTH WAYS. LARGER MH TO BE CHANNEL SHELF EQUIVALENT .3. REVIEWED ON A CASE BY BY CASE BASIS USING 1-01 4 CONTRACTOR/IIEVELOPER SHALL MAINTAIN AND REPLACE APWA STANDARDS. STRAW BALES TO INSURE PROPER ERDS113N CONTROL. 4. JOINTS SHALL BE RUBBER GASKETED ONLY, NSPECTION REQUIRED ON ALL EROSION CONTROL CITY INSPECTION REQUIRED ON ALL MEASURES BEFORE WORK CAN BEGIN, EROSION CONTROL METHODS JEFORE Fc -ITY I MH' PER W.S.D.O.T. APWA 6- MIN. OTHER WORK CAN BEGIN. STANDARD PLAN B-230. REBAR MIN 2* CI EAR 7671 'S LUP osWfaxNote T.Y., OF - h. 0 , ­ 0 TT Y., -OND STANDARD DETAIL UL STANDAJqD DETAJL 43TANDARD DETAIL APPWVIM W I DAM MWO TYPE I MH (SAWARY) Mimfn=fum DAN -t IqA /M ;;s PLI DAN Wi" I 7/24/M NTS E11.2 1890-1990 7/24/M I NTS 890-1990 i - I LEGEND." 0= OW. &#?UMY, CHMPEW # EWRGAMn?W P"NNEDPROPERTYCOWER AINSURVEYED COWER) X.- 2'REFERENCE POINT TO PJW LINE NEW CONTOUR UNES SILTFENCELINE I * EST. QUANTITY OF CUT: I ISO CU. YDS. 2. EST. QUANTITY OF EXCAV. & EMBANKMENTS: I 160 3. EST. QUANTITY OF SURPLUS TO EXPORT:1 160 CY 4. PROPOSED DISPOSAL SITE: TO BE DETERMINED AND SHALL BE OUTSIDE OF EDMONDS CITY LIMITS. 5 ' EST. QUANTITY OF IMPORTED MATERIALS: 221 CY 6. TOTAL AREA TO BE CLEARED: 24,200 SF 7. PROPOSED HAUL ROUTE IS 76TH AV SOUTH TO 204TH ST NE; LEFT TO BALLINGER WAY & CITY OF KENMORE AREA. APPOR FOR CONS TION BY., DA TE: 2 -10 I EXPIRES._ 4/5/2D04 I I G11 I UP M_J1V1U1V_UkD rA No. I Revision/issue I Date rProject Name and Address SCL ENTERPRISES TU R IVE 23124 76 TH AV W EDMONDS, WA 98020 MAR 11 2004 PERMIT COUNTE MINTERPRISES, LLC "set 76THAV.WT0WNH0MES___ Date NOV 3,203 Scale 3 1 IN = 20 FEET FVACA09&6a-76TH1C2M1.DMrev. 1/15W NE 114, NE 114, SEC TION 3 1., To WNSHIP 2 7 NOR TH. RA NGE 4 EA S Ts W M. General Notes NOTE.' TER mANAGEMENT2 (OR 1) CARTRIDGE STEEL UNITA T INS TA L L 2 STORM FIL TER CBs B Y.,307ORM WA LOCATIONS SHOWN ON SHEET C113; THE2 CARTRIDGE UNITAT THE WEST END OF DWYAND THE I UNITAT THE EAST END, THE EAST UNIT SHILL BE SMI MODEL CBSFI - L AND WEST TO BE CBSF2- REINFORCING BARS WrTH MINIMUM 6* OVERLAP. . FOR PERIMMCSIAB �ey CO TOR)A A t— ,RADIAL FLOW /-S' OUTLET CARMDGE PIPE STUB (STD) B .41 all GENERAL NOTES: 1.) STORmnLTER BY STORMWATER MANAGEMENT INC-- PORTLAND. OREGON (800-648-4667). 2.) CATCH BASIN MUST BE SET LEVEL 3.) OMNAL PIPING AND COUPLINGS TO BE PROVIDED BY OTHERS. 4.) FMISLE COUPLING TO BE USED AT INLET & OUTLET- FERNOO OR ENGINEER APPROVED. 5-) STORMFILTER REQUIRES REGULAR MAINTENANCE. REFER TO OPERATION AND MAINTENANCE MANUAL FOR DETAILS. S.) CATCH BASIN sToRmnLTER STRUCTURAL SPECIFICATIONS: LOAD RATING: 20,000 LB. " CONSTRUCTION I STEEL PLATE MIGHT! 9�4 A UNIT v 0 Le. INLET GpATE- DUCTILE IRON PERIMETER SLAB: REQUIRED LIFTING EYE (TyP) --I - B -O*J \\_INLET PIPE X 27-3/4' 27-3/4* X 27 3/4'—/ GRATE Slue (OPTIoN&) SOLJO LID Sat7 0 LID CATCH BASIN STORMFILTER - F.LAN VIEW CATCH BASIN STORMFILTER scum H.T.L- PMIMErER SLAB 3,000 PSI CONCRETE TO *SDE or (BY CONTRACTOR) 2'-4- um�x FILI ER CHAMBER INLET Slum BAFFLE VArdES OVERFLOW WEIR WITH CLEANOUT 7hg gToT=JTGMffNT 0 U.S. PATINT NO. SX2,M- N .5,707.527. NO- 6-027-639- N:. 6,624.578, AND OTSER U-S- AND FORZON FAIENTS PICHDING t REINFORCING BARS CONTRACTOR) 2!-3 3 1�4" (2.3 IN 1\ II.,-&OUTLEt)PIPE 9 (STO \'�CLEANOUT OPENING IN OVERFLOW WEIR CATCH MIN STORMFILTER - SECTION VIEW Ir-'sh YLE!L�i SCAM KM \IV :FIL TER -VA- UL T DE -TA IL NOT TO SCALE d; BENCH MARK: SSMH #103 INV-369-01-----' 3 JOIN NEW SSMH#102A TO EX. W/SAD,DLEC2 -ER LINES R/TELE./CABLE F(�)GAS MAIN [—(jj STRIPING 3 30 p. I wc H -HE HAJ�GE 'HT. TO 3 --RE A PLANTS MAIL X PUD VAU TS D I D 0 E T WTR AROUND PUD PED. 3 2" METERS & DDCVAs p p FIRE YDR.'g POR UNIT 1B UNIT 1A 2A HARD LANDc;CAPE Z 8XI 0 (TYP) i CBF FILL TRENOH�S H. L. Q0 H.L. I L. 6' FE CE GOES TO 3' @10) FROM R/W LINE A N 611 SI CURB CUT E/ BEGIN PRb I E @13.5) d/N PI P. LN 0 F= �7 Gy P0 11 y - IUIN 611 [1 MAIN W/611 WV C."-rAP 7-k G" S L —M E X3 - Q0 0 0 0 < 4 --I (:;d 0 n 0 I I 1 00 0 ry 0 ::D ry < U-) CD x 30' --I r-% -0-'& N-- R-ft EN TRA NCEIU TIL / TY P- LA N rJ ENLA Lx L=V - C000 EXIST. SHRUBBRY, 6'HIGH PLUS EVERGREEN TREE DECIDUOUS TREE, SIZE SHOWN(DIA) PLANNED PROPERTY CORNER 0 (UNSURVEYED CORNER) X- 2'REFERENCE POINT TO R1W LINE 0 DOWNSPOUT NEW CONTOUR LINES CLEARING LIMITLINE NEW WATER MAIN OR SERVICE NEW SAN. SEWER MAIN OR SERVICE — — — — — — — — EX. WATER 14A IN OR SERVICE EX. SAN. SEMER MAIN OR SERVICE SCALE., I If= 10' GRAPHIC SCALE E -- —1 XPIREE 4/5/2004 END BENCH MARK: INVERT OF EX. SSMH#103 AT ABOUT 2001 NORTH OF SITE ON 76TH AV W; INV 369.01 PROPOSED IMPERVIOUS AREA 16,980 SF EXISTING IMPERV. = 2800 SF RECEIVED APR 0. 9 2004 PERMIT COUNTER APPR FOR CONSTRUCTION BY. DATE., CITY OF EDMONDS No. I Revision/Issue I Date Firm Name and Address DEAN HOUGH & ASSOCIATES 8918 11THSTNE EVERETT, WA 98205-1407 PHONE 425-335-0262 Project Name and Address SCL ENTERPRISES TOWNHOMES 23412 76 TH AV IN EDMONDS, WA 98020 SWgNTERPRISES, LLC Sheet 76THAVWTOWNHOMES C42 A Date March 3, 2004 Scale 3 1 IN = 40 FEET P3.IACAD981SCL-76THIC2306bl.Z"'W'G REV31251174 %% --do PERMIT NO: 400M ity of Edmonds, PERMIT EXPIRES loc. gc)z SIDE SEWER PERMIT Address of Construction: �P-5 i,5zq -Ito' A ve- W. LI'D # Tax Account Parcej�_ 'Property 0/) Attach copies of all access and utj)ity,ea'semertts Veri ied and. Approved b Owner and/or Contractor: i .Contractor Licfise*: A,"AA Builffi-n-g-P—ermilk ly _;, q /70. invasi' WY )�inpl`e Family on in o City *Right -of Way: es No t c M In"Family (No. of 6nits R"W tonst ctio'n Permit es C� ss othe "Private Property: Y No Crmercial (No. of Units __L .0 1 Pqblic" "Attach le,,al description and copy.of recorded easement. ..Owner/Contractor C 'tr6a-ct-oq-r--signa6re-a-treackno D X on wiedgeme' fit.state'ment: By-giining for this permit I certify, that I have read,the City'.s pu I ic, handout entitled SidZ'8_`ewer 91peciftations, and shall eomply'w'ith- all City requir ments outlined therein. CA�L DIAL -A -MG -(17800-42*, 5555), B FORE ANY EXCAVATION 62 2 FOR INSPECTION. CALL 425-7 1-0220 exten'sionVj_9VA'- 24 HOUR NOTICE REQUIRED FO . R AL INSPECTION REOUESTSr . .. . .. ...... . Ly... FOR OFFICE USE 0 P . erml . t �Fee $ Repair Fee $ Issued 8 . "N \j Assessment Fee $ Rec ipt No: city Permit Surcharge Fee &5.00 Total Fees Paid $ 6-0(910 NOTE: IF JOB SITE IS NOT READ ECTION WHEN INSPECTOR ARRIVES. A $45 RE-INSPEC1 ION FEE WILL.BE- CHARGED.. Job Site Ready YES NO - Date: Initial: Partial Inspection: ftfa (1 II'Mowle (i e1 Date*��-flbs-lnitlal:vn Partial Inspection: Date: Initial: FINAL INSPECTION APPROVED: Date: As-builtto Street File: E] 11, PERMIT MUST BE POSTEO, ON JOB SITE t- White Copy: File Green Copy: Inspector M Copy: Applicant L;temp;bldg;forms;sspertnitjlg4/00 DATE RECEIVED Id PERMITEXPIRES CITY OF E;MONDS USE PERMIT ZOT N U M B E R,0&,//— ON', C CONSTRUCTION PERMIT APPLICATION 1OEr SUMAPT# ADDRESS 23/z�, 76 0 Ai4, 4). FI177fzl OWNER NAME/NAME OF BUSINESS PLAT NAME/SUBDIVISION NO. LOT NO. LID NO. LID FEE $ _Zo , 2. 1 V4 /a( C-A ot �e M MAI� AILI DRESS NG AD PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP TESCP Approv, RW Permit Req�:_ li" . Iv, EXISTING P-ROP SED street use Perm.11 Req-d Inspection Required CITY ZIP TELEPHONE Sid"alk Required [3 Y1,15 J 20 6 6 0 3 00 REQUIRED DEDICATION= FT Underground 1 wiring requiredi Ila NAME METER SIZE LINE SIZE NO. OF FIXTURE PRV REQUIRED A'I& 4b-79 I sit 42 1 YES NO 13 1 3 jj!: Iz 15 REMARKS z z 4. OWNERICONTRACTOR RESPONSIBLE FOR EROSION CONTROUDRAINAGE jP111A-Ag IV CITY ZIP TELEPHONE 6/k') Ve,4-la- Itz, kx0j00 a 014 S, 1 41." Sin, yv-k NAME CPL# 9NGINEERIN ,G REVIEW�D BY DAfq ADDRESS 4140,,4 MEN FIRE -REVIEWED BY DATE 0 CITY ZIP ',1 5y. 0", /,; - , I TELEPHONE .. I 200.!�%2 2-f nr 1 640.7 - . rL L STATE LICENSE NUMBER EXPIRATION DATE"']. . .1 �VmiANCE'61R.60,­_ SHORELINEORADBI1.0 �j INSPECTION 'REO'D BOND POSTED Sd 04� 13NO $101 1 1 b tXA14, SEPA REVIEW COMPLETE EXEMPT SIGN AREA ALLOWED PROPOS ED HEIGHT __?ALLOWED PROPOSED -j PROPERTY TAX ACCOUNT PARCEL NO. LOOS 71-160 9- 1 0(5b Q/4 C/ , EXP0/; NEW RESIDENTIAL: X-_PLUM'BING/MECH COVERAGE�, A L ED ::R EQUIRED (FT. FRONT �PROPOSED SETBACKS (FT.) F­PROPOSEO SIDE R,EAR FRONT L/R SIDE REAR COMPLIANCEOR 0 E] ADDITION C MMERCIAL El S U E 44 b5,0 - 40 �,A rb /0j Z re 1:1 REMODEL ML MULTIFAMILY 0 SIGN z PARKING RIE PROVIDED OD LOT AREA PLANNING REVIEWtO-B'Y' D4 .--/CENCE REPAIR 'dYDS X FT) 2_1 Y2 QLA REM L ARKS— DEMOLISH TANK OTHER i, E vx-, 1., 0 c- -N%L, V-k GARAGE RETAINING WALL,.' FIRE SPRINKLER d A A A_ YVJ7A__ A944-,b z CARPORT ROCKERY FIRE ALARM CrYPE OF USE, BUSINESS OR ACTWM-EXPLAIN: 1 Z),Pk 7o,,,v CHECKED 8 Y JCODE' OCCUPANT x. 14 e" 6PIPL6'. , �JONSTRUCTION C1 -7 GROUPK-;� NUM ER uj NUMBER OF CRITICAL SPECIAL INSPECTION AREAV/411-A VAI)T-B OCCUPANt '0 OF DWELLING AREAS STORIES UNITS NUMBER REQUIRED YES ,:3 lyl a W_j__ LOAD DESCRIBE WORK TO BE DONE REMARKS z PROGRES& INSPECTION& PER 1.160'.1104ifFINAL INSPECTION REO'D V. VALUATION 2AV Wrr fs &A&wAF,= --3,xa. kr-,*P)_ Description "FEE Description FEE lm, F�1= 3-7. Plan Check State Surcharge HEAT SOURCE GLAZING % ;LOT�SLOPE % 11/0 :Building,,Permit`- City Surcharge PLAN CHEC VESTED DATE M �flurnblhg.J Mechanical THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO I= BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC Grading DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. Engr. Review Lu PERMITAPPLICATION: 168DAYS PERMIT LIMIT: I YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS Engr. Inspection" �0 SEE BACK OF PINK PERMIT FOR MORE INFORMATION 'APPLICAK ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESORS Fire Review 59— Plan Chk.Deposft IN INTEREST, AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF ,99,/)7— a EDMONDS, WASHINGTON, ITS OFFICIALS. EMPLOYEES, AND AGENTS FROM ANY AND Fire Inspection IM Receipt # 50 4 ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY X FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE !3 DEEMED TO MODIFY: WAIVE Landscapelnsp. 757 OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE TotalAmt.Due 0 NOR LIMIT IN ANY WAY THE CITY`S ABILITY TO ENFORCE ANY ORDINANCE PROVISION.' x . Recording Fee — Receipt # L I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION GIVEN IS CORRECT; AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF APPLICATION APPROVAL THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC- This application is not a permit until signed by the CALL TION; AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED Building Official or his/her Deputy: and Fees are paid, and IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO FOR INSPECTION receipt Is acknowledged In space provided. WORKMEN'S COMPENSATION INSURANCE AND RCW 18.27. SIGN DATE SIGNA�T �011 ED (425 l!. —] DATE SIGN �OFFICI 771 -0220 BY /bATE �RE)LSEO I ATTENTION Off 1333 !r/7 IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL � A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 OR!GINAL - FILE YELLOW - ASPECTOR P NK - OWNER GOLD -ASSESSOR 04/02 PRESS HARD -YOU ARE MAKING 5 COPIES GREEN ACCOUNTING f )151rl 4f - (f 0,,,7 e e- 7��Oa 7- V (iot 6 APPROVED FIRWERAVIpTT 2-0 At 0-oAole(,+iorJS +D be- C10,0&-t .4.14,eb-�j 46 S.A t1p I volk A ADDR-C.5S , '7-3�3c> ,5*%ke A a Awe W. LVA qvozo 0* &- -"eciz- fl� Pjt( LiAAIJ AVC w.4 J�JS3 6�1 4. f4 e- Le- i-se - 5eL C . La /WZ1 CiAlr�j At,,e /V, 47 A jr 206- Zz (p C, .3 9, &C'e" -Z C, r, - -5,--7 3 - 603E wf-/1117 4 x APPI-0VED A-.S NOTED BY ENGINEERING Date::. 41 it AALJL fC)V- I-grzDh> 4S.5--7-)I-6Z-W V-9T- 1A4 (All^- a^ g(IAA-1 2, An 6u(,�y AbDiZES3 f 7, Pt 4,0 b R E jj - Z -7 / -2- 4 4jal ve uITY COPV T RESUB APR 05 B05 SUUWM WAMMENT WY OF EDMONDt mc, cb."ViCes fo-9. S 4 -!Pa; tkN a 4 iW rr who su->cn (D _I - ^elees ,4'f 4LS44 VIC 5 ide .,4 /,1:, ov -7&-fb Ave W. UNJ VNA i A ~Z,SS ' 231Zy KE 4 -z- 3 j 7- R' 4/,v,'k 4 2.3)30 OAI,"/ I 3 C//v "4- Arc c,,v AAL,,r-I v rQ C>ac, -3 ��j � (qto, I.Introduction to Report This T. 1. R. is submitted along with the four civil and surveyor construction plans for a 10 townhome complex in the City of Edmonds addressed as 23124 76th Av W for SCL Enterprises, LLC. This SEPA grading permit application is to comply with City of Edmonds gtading requirements and the drainage is to comply with City Development Code, Chapter 18.30 and City of Edmonds drainage ordinance requirements. Part I The Project Proposal A. Existing Conditions This project is to obtain permits for grading and providing storm drainage and utility improvements for a townhome complex at the crest of a hill on 76th AV W and south of Pacific Highway. The site is a single family residence with about 15 tall fir trees in the backyard and which is surrounded on the south by two abandoned single family homes and a new duplex; on the west by a commercial site and on the north by an old apartment complex. The existing home and all trees will be removed to make way for the development. It is situated on the west side of 76th Av W about 100' north of 232nd St SW. The site slopes from west to east in general but specifically about Zfeet from north to south at 2.5% slope. To make access into the site some minor grading will be necessary for the 24' wide driveway/sidewalk. This apartment complex will take access off 76th Av W using an asphalt driveway along the north property line. No rockeries or retaining walls will be needed, but will make use of the existing 2' concrete wall along the south property line. Generally the site is flat. A SEPA checklist for this development will be submitted by the owner. A 33" detention pipe is parallel to the north property line and will drain along a "bumped over" storm drain extension at 3' east of curb face at the front of site. The drain is moved over because an intefering sewer manhole on its alignment. See DHA sheet C1/3. The downspouts will drain into the two storm filter vaults for water quality before draining into the restrictor manhole be detained and then go south along the new storm drain extension to join the existing CB noted above. Also the foundation drains can go into the detention pipe since the pipe is about 1.5' below the foundation. 1 0 0 The access will use the full 27'wide driveway from face of duplexes to north property line for utililties and vehicle - pedestrian access. This corridor will service all utilities including storm, sewer, water for fire and domestic, power, telephone, cable and gas. The driveway will be with reverse crown so that the north side of the driveway slopes at 2% to gutter as shown in section A -A and at 13.3% maximum to the steepest approach to garage floor on the south side of driveway. The apartment configuration is this - that the first floor drops 6 inches into the garage. From the living space the hard landscaping will be accessed with steps in the back, drop about 2'to the concrete and trail off to elevation 376 at the existing 2' retaining wall at the south property line. . As can be seen in the profile the driveway will drain east and west from the crest at the east 1/3 point and drain into the two storm filter vaults for water quality. B. Offsite Analysis Seventy-sixth Av W rises going north for about 1600'to the site which is close to the crest and then drops about 40' in about another 1500'to join Pacific Highway on askew angle. The site is about 100 to 200'south of this crest. The first catch basin that drains the site basin is on the west side of 76th at the north side of 232nd St SW. See the topographic map by Emerald Land Survey. This basin drains south along 76th to the existing CB on the northwest corner of 76th/232nd St SW continues south in 76th Av and then goes east to Lake Ballinger at about 236th St and of course Lake Ballinger drains south in Macaleer Creek to Lake Washington in about 3 miles. The soils map as shown on page 2B by SCS shows that the site is mostly in type C soil and is typed as Alderwood Urban Land Complex, 2 to 8% sloping.� The soil is drainable, but is only shallow to about 24 to 36" deep before the soil consolidates into glacial till. In addition City standards map allowing infiltration does not cover this area and therefore, infiltration is not allowed in this area. Part 11 Drainage Design for the Grading Plan A. Detention Design Calculations A calculation of impervious surfaces for both existing and developed conditions to determine the detention volume for the 10 and 100 year storm for this townhome development is shown on page 2A, the Hydrograph Input Calculation Table. 2 DEAN HOUGH & ASSOCIATES 30-Oct-03 HYDROGRAPH IMPUT CALCULATION TABLE: CITY OF EDMONDS: SCL TOWNHOMES ADDRESS: 2312476th Ave W IMPERVIOUSIPERVIOUS AREA CALCULATIONS: DEVELOPED CONDITIONS ��6 --COT —NO. 1 ---L—ENGTH 46.2 %WIDTH— 43 -TOTAL A—REA 1986.6 LENGTH WIDTH -T—TAL AREA 0 LENGTH WIDTH TOTAL AREA 0— LENGTH WIDTH TOTAL AREA 0 0 0 0 0 1 46.2 — 43 — 1986.6 0 0— 0 0 0 0 0 1 46.2 43 1986.6 0— 0 0 0 0— 0 0 1 46.2 43 1986.6 0 0 0 01 01 01 43� 1986.61 1 1 uj 0 01 0 01 (PER AUTOCADI 1 1 69641 AREA DESCRIPTONIREMARKS Qu.. � � - -1- ` -1 - - ---- TOTAL IMPERV. SURFACE = 16897.0 SO FT.= 0.388 ACRES LENGTH WIDTH TOTALAREA TOTAL PERVIOUS SURFACE = PROJECT AREA - IMPERV SURFACE 0.1169 AC. PROJECT AREA ISO FT)= 303.251 60 24260 SO FT 0.557 ACRES ADD NEW RD PAVING & S/W= 0 SO FT PROJECT AREA + NEW RD= 24260 SO FT 0.557 ACRES IMPERVIOUSIPERVIOUS AREA CALCULATIONS: EXISTING CONDITIONS ....... l A. Al. KA1Qr I LOT NO. TH WIDTH TOTAL ARD I WIDTH LENGTH WIDTH i I TOTAI-An LENGTH WIDTH TOTAL ARLA,j 1 62.11 28.31 .431—LENGTH 1151.431 100.61 101TOTALAREA1 2 10.51 01 01 01 i 01 01 Qu. . . I - 11-- TOTAL IMPERV. SURFACE 3630.4 SO FT.= 0.083 ACRES TOTAL PERVIOUS SURFACE = PROJECT AREA - IMPERV SURFACE 0.474 AC. 10.5 = 1.0" 110 2.0" L100 3.00' FOR R/D DETENTION THRESHHOLD CALCS: TIME OF CONCENTRATION: USE FOLLOWING PARAMETERS FLOW TYPE LENGTH U/S ELEV. D/S ELEV SLOPE SURFACE TYPE ISHEET 180 379.1 3751 0.02!28 12nd Gr Forest Cn = I — I I ---I— I Cn = SHALLOW I I I I Hydin2306.1231 AREA DESCRIPTON/REMARKS Ex shed onc. patio idewalk COMPOSITE Cn CALCULATIONS: For developed conditions 81 FOR SURFACE TYPE: 2ND GROWTH FOREST AREA OF SURFACE: 90 FOR SURFACE TYPE: 50-75% GRASSED AREA AREA OF SURFACE: PAGE 2A 0.474 ACRES 0.083 ACRES 0.169 ACRES 0.388 ACRES 0 0 0 The above noted table shows that the proposed impervious area includes the driveway, apartment buildings and street improvement areas which is zero, and that the existing condition involves second growth forest of alders with no impervious surface even though there is a concrete driveway and the existing house. The area of the access driveway paving (shaded area) including sidewalk was determined by Autocad. Also on this table the storm intensities for the City of Edmonds is listed. The curve numbers of 98 and 81 for impervious and second growth forest were used here. After development the Cn rises to 90 for 50 to 75% grass on this type C soil. The route that water travels on site is indicated on page 1 of Appendix A as sheet flow from the north property line of the site going somewhat on a diagonal southwesterly to the south property line for 180 feet through second growth forest at 2.3% slope. The actual time for flow to go this distance using sheet flow becomes 47.6 minutes. The Waterworks software determines the peak 100 year storm peak flow on site in Basin A by creating six hydrographs See page I and 2 of Appendix A. The Waterworks calculations shows that there is about 0.23 cfs increase in the 100 year - 24 hour peak in storm flow. It should be noted that the time for flow concentration for developed flows will be faster off site than the existing conditions since developed conditions will have a higher impervious area. With the minimum standard time of 10 minutes, the hydrograph for the developed conditions is maximum and will provide the greatest possible difference and amount of storm flow to detain to protect the existing downstream structures. The calculation of detention calls for 260' of 33" diameter pipe or 1544 cu ft.; therefore, the actual 258' of 33" diameter pipe provides 1536 cu. Ft and the volume in the three type 11 manholes which is not included in the Waterworks volume calculations provides 50 cu ft needed to fulfill the total required volume of 1544 cu ft. See Page 4 for orifice sizes and location (elevation) and page 5 for peak water level for both storms. The actual volume used is 1386 cu ft and therefore the water level is below the top of pipe at 0.44' below soffit. B. Culvert Conveyance Analysis To check available capacity for the new pipe going from site that joins the existing pipe to the existing manhole, the full developed 100 year-24 hour on site storm flow of 0.34 cfs for 0.4 acres. See Appendix A - page 1. Combine this with the upstream flow coming south along 76th Av W from site and CB #2 (type 1) to test the new storm drain pipe. See page 3A for drainage basin that contributes to the nearby CB which is 1.6 acres. Even at 4 times the THE ON AND OFFSITE DRAINAGE BASIN MAP ON & OFFSITE BASIN AREA 1.61 AC.— (o E)L APT BLDG I D'VENTION PIPE BENCH'MARK: SSi4H §103,,NV-369.01,��-- 2. SEWER MAIN 7 NEW SSUH#I- 3 FE 6!,FENCE -40'?�w N /89 63.24', RAW. 10, PW. Ej SEMENT, (T 21 I ;� c� p �PII-111 5 P-11* P-j p T 4 -UN p �1 A UNIT 2F, UNI A N1 18 U 111 1 UMT 5B UNIT 5A, 0 EL2 L) z U10 HARD CA cd H.L Anyp� b .6 w EMNN CME 3' s 303.26' 6'. r 30. 1 L 0.45' IP (D I I NATUR& DISCHMME POINT: EX. CB---' PAGE 3A LN \ACAD98\SCL-76TH\C23O6PLS1.DWr3 10/31/03 (6 U: d Z W 0 FIGURE 4.2.1.F NOMOGRAPH FOR -SIZING. CIRCULAR DRAINS FLOWING FU�L 1,0C 900 800 700 600 �*Tf :1 LOR 300 120 -108 200 �88 -84 -78 -72 -66 100 -60 90 -64 80 -48 70 W X 42 60 0 50 Z -36 z. -33 40 -30 50 W 9: -27� 0- 30 U_ -24 0 -21 cc 20 W -18 W 115 8 5 12 10 -10 9 SAM 8 7 -8 24� d 6 17cfc (n=O 4 Valu Q 3 This to ot 2 form 1 .0001 -2.0 .0002 .0003 Minimum Allowable .0004 .0005 .0001 Velocity I ** ***:-3.0 .0006 (Flowing .0008 .0002 Full) "Rt CM 001 q .0003 0004 0005 -4.0 cc .0006 .00 0 3 .0008 U_ W 004 005 .001 15.0 CL 0 .006 .008 .01 .002 N z - 0 C) C; cc) 6.0 .003 .004 cc 7.0 .02 .005 0 u- W a. .006 .03 .008 1z 8.0 .04 .01 W U_ 9.0 Aco z 020 10.0 10 t .030 0 0 .040 .050 W > .060 .080 .100 PLE USE ia. CMP @ 2% slope yields @ 5.4 fps velocity .024) es per Manning's equation 1--49- ) AR2/3 SOY2 n table can be -converted her"n"values by applying ula: Q1 n2 Q2 nl 30.0 40.0 0 0 onsite flow of 0.34 cfs or 1.4 cfs it will not test the new pipe which will hold 4.8 cfs under normal uniform flow conditions and at 1.5% slope. See page 3B Nomograph to determine the normal uniform flow handled by this pipe at 1.5% slope and 12" in diameter being smooth wall inside. Since the pipe will be more than adequate to contain the projected onsite storm flow and even upstream flow, no conveyance is presented here other than the above nomograph study of capacity for the new storm drain extension along 76th Av to the site. See sheet C2/3 for the plan and profile of the storm drain extension. C. Water Quality Design for Storm Filter Vaults Two water quality storm filter vaults or catch basins are used here. Water quality standards requires that the 6 month water quality storm to be infiltrated in the water quality system if the storm filter vault(s) is used. See Appendix B - page 1 for the 6 month storm hydrograph. Since the driveway pavement is crested at the east 1/3 point in the driveway, 70% of the drainage goes west to the 2 cartridge unit and the east 30% of the flow goes to CB # 3A 1 cartridge unit. The following is the calculation of flow and calculation of number of cartridges needed to filter the 6 month storm for this site: R = rate per cartridge = 15 gal/min. Q-0.5 = 0.08 Qu Ft/sec (see Appendix B - page 1) N = # of cartridges needed for site = (0.08 x 449 gpm/cfs)/15gpm = 2.4 At 70% of the flow # of cartridges used in CB #4A = =(0.08x449)*0.7/15 = 1.7 units or 2 units rounding up. AT 30% of the flow # of cartridges used in CB #3A = =(.08x449)*0.3/15 = 0.7 units or 1 cartridge rounding up. 0-" v4t Pr L�q J o -f '0 -12 4 0 Waterworks Printouts: A. Detention Design Calculations B. Water Quality Design Hydrograph page 1-5 page 1 10/23/03 7:59:26 pm Dean Hough & As 0 iates page 1 EDMONDS: FOR SCL ENTERPRISES, LLC Address:23116 76TH AV W - 5 TOWNHOME8 APPENDIX A:DETENTION DESIGN:10/100YR 24H BASIN SUMMARY BASIN ID: A100DEV SCS METHODOLOGY TOTAL AREA ....... : RAINFALL TYPE .... : PRECIPITATION .... : TIME INTERVAL .... : NAME: BASIN A DEV. COND. 100YR-24HR 0.56 Acre� TYPElA 3'.00 inches 10.00 min ABSTRACTION COEFF: 0.20 PEAK RATE: 0.34 CfS VOL: BASIN ID: A100EX SCS METHODOLOGY TOTAL AREA ....... : RAINFALL TYPE .... : PRECIPITATION .... : TIME INTERVAL .... : BASEFLOWS: AREA. . : CN .... : TC .... : 0.00 cfs PERV 0.16 Acres 90.00 10.00 min 0.11 Ac-ft TIME: 500 min NAME: BASIN A EX. COND. 100YR-24HR 0.56 Acres TYPElA 3.00 inches 10.00 min BASEFLOWS: AREA. . : CN .... : TC .... : 0.00 cfs PERV 0.56 Acres 81.00 47.63 min ABSTRACTION COEFF: 0.20 TcReach - Sheet L: 180.00 ns:0.4000 p2yr: 1.50 S:0.0228 PEAK RATE: 0.11 cfs VOL: 0.06 Ac-ft TIME: 530 min BASIN ID: AlODEV. SCS METHODOLOGY TOTAL AREA ....... : RAINFALL TYPE .... : PRECIPITATION .... : TIME INTERVAL .... : NAME: BASIN A DEV. COND. 10YR-24HR 0.56 Acres TYPElA 2.00 inches 10.00 min ABSTRACTION COEFF: 0.20 PEAK RATE: 0.21 cfs VOL: BASIN ID: A10EX SCS METHODOLOGY TOTAL AREA ....... : RAINFALL TYPE .... : PRECIPITATION .... : TIME INTERVAL .... : BASEFLOWS: AREA. . : CN .... : TC .... : 0.00 cfs PERV 0.16 Acres 90.00 10.00 min 0.07 Ac-ft TIME: 500 min NAME: BASIN A EX. COND. 10YR-24HR 0.56 Acres TYPElA 2.00 inches 10.00 min BASEFLOWS: AREA. . : CN .... : TC .... : 0.00 cfs PERV 0.56 Acres 81.00 47.63 min ABSTRACTION COEFF: 0.20 TcReach - Sheet L: 180.00 ns:0.4000 p2yr: 1.50 s:0.0228 PEAK RATE: 0.04 cfs VOL: 0.03 Ac-ft TIME: 530 min IMP 0.40 Acres 98.00 10.00 min IMP 0.00 Acres 0.00 0.00 min IMP 0.40 Acres 98.00 10.00 min IMP 0.00 Acres 0.00 0.00 min 9 0 10/23/03 7:59:28 pm Dean Hough & Associates page EDMONDS: FOR SCL ENTERPRISESr LLC Address:23116 76TH AV W - 5 TOWNHOMES APPENDIX A:DETENTION DESIGN:10/100YR 24H HYDROGRAPH SUMMARY PEAK TIME VOLUME HYD RUNOFF OF OF Contrib NUM RATE PEAK HYDRO Area cfs min. cf\AcFt Acres 1 0.038 780 3099 cf 0.56 2 0.111 580 4992 cf 0.56 2 9 0 10/23/03 7:59:28 pm Dean Ho.ugh & Associates page 3 EDMONDS: FOR SCL ENTERPRISES, LLC Address:23116 76TH AV W - 5 TOWNHOMES APPENDIX A:DETENTION DESIGN:10-/100YR 24H STORAGE STRUCTURE LIST UNDERGROUND PIPE ID No. S1 Description: STORAGE PIPE, S1 Diameter: 2.75 ft. Length: 260.00 ft. Slope ... : 0.0000 ft/ft upstr: dnstr: 0 0 10/23/03 7:59:28 pm Dean Hough & Associates page 4 EDMONDS: FOR SCL ENTERPRISES, LLC Address:23116 76TH AV W - 5 TOWNHOMES APPENDIX A:DETENTION DESIGN:10/100YR 24H DISCHARGE STRUCTURE LIST MULTIPLE ORIFICE ID No. ORI Description: ORIFICE STR. OR1 Outlet Elev: 372.00 Elev: 370.00 ft Orifice Diameter: 1.0474 in. Elev: 373.80 ft Orifice 2 Diameter: 1.8369 in. 0 0 10/23/03 7:59:30 pm Dean Hough & Associates page 5 EDMONDS: FOR SCL ENTERPRISES1 LLC Address:23116 76TH AV W - 5 TOWNHOMES APPENDIX A:DETENTION DESIGN:10/100YR 24H LEVEL POOL TABLE SUMMARY MATCH INFLOW -STO-,-DIS- <-PEAK-> OUTFLOW STORAGE < -------- DESCRIPTION --------- > (Cfs) (cfs) --id- --id- <-STAGE> A (cfs) VOL (cf) 10 YEAR STORM DESIGN ......... 0.04 0.21 Sl OR1 373.67 1 0.04 980.58 cf 100 YR STORM DESIGN .......... 0.11 0.34 Sl OR1 374.31 2 0.11 1385.77 cf __0 -Jos 0 10/21/03 4:55:16 pM Dean Hough & Ass* iates page 1 EDMONDS: FOR SCL ENTERPRISES1 LLC Address:23116 76TH AV W - 5 TOWNHOMES APPENDIX B:WATER QUALITY:6 MON 24 HR-DEV BASIN SUMMARY BASIN ID: AO.5DEV NAME: BASIN A DEV. COND. 6 MON 24HR SCS METHODOLOGY TOTAL AREA ....... : 0.56 Acreg BASEFLOWS: 0.00 cfs RAINFALL TYPE .... : TYPElA PERV IMP PRECIPITATION .... : 1.00 inches AREA..: 0.17 Acres 0.39 Acres TIME INTERVAL ..... 10.00 min CN .... : 90.00 98.00 TC .... : 10.00 min 5.00 min ABSTRACTION COEFF: 0.20 PEAK RATE: 0.08 cfs VOL: 0.03 Ac-ft TIME: 500 min i DEAN HOUGH & ASSOCIATES 8918 11th St NE Everett WA 98205-1407 Phone & Fax: 425-335-0262 ...................................................................................................................... Technical Information Report Addendum RtCERVE] for SCL ENTERPRISES TOWNHOMES MAR I 12004: In City of Edmonds PERMIT COUNfl�, At 23124 76th Avenue West ............................................................ .................................. ... . Prepared by Dean M Hough, PE Consulting Engineer I EXPIRES: 4 For Mr Don Fiene, PE Asst. City Engineer Development Services Department City of Edmonds, WA Owner: Shaun C Leiser/SCL Enterprises, LLC At January 16, 2004/Revised March 10, 2004 STHrr"EET IRLE DEAN HOUGH & ASSOCIATES 8918 11th St NE Everett WA 98205-1407 Phone & Fax: 425-335-0262 Qu?-'N� tv Technical Information Report C,.Pj for SCL ENTERPRISES TOWNHOMES (ot � 4 4.D-0- In City of Edmonds At 23124 76th Avenue West ty .................................................................................................... ...... Ho Prepared by Dean M Hough, PE Consulting Engineer For Mr Don Fiene, PE Asst. City Engineer Development Services Department City of Edmonds, WA Owner: Shaun C Leiser/SCL Enterprises, LLC November 3, 2003 17021 NOV 13 2003 S7F4Ef571— F/LF, DEVELOPMENT SERVICES CTR. cITY OF EDMONDS i Here on January 16, 2004 AND AGAIN ON 3/10104 a T. 1. R. Addendum is submitted along with the civil and surveyor construction plans for a 10 townhome complex in the City of Edmonds addressed as 23124 76th Av W for SCL Enterprises, LLC. This SEPA grading permit application is to comply with City of Edmonds grading requirements and the drainage is to comply with City Development Code, Chapter 18.30 and City of Edmonds drainage ordinance requirements. PAGES 3 THRU 6 HAVE BEEN CHANGED TO INCLUDE INFORMATION ON THE FILTER CATCH BASINS AND TO EXPAND THE DETENTION TO PROVIDE FOR A 0.01 ACRE BYPASS OF DRAINAGE FROM SITE. Part I The Project Proposal A. Existing Conditions This project is to obtain permits for grading and providing storm drainage and utility improvements for a townhome complex at the crest of a hill on 76th AV W and south of Pacific Highway. The site is a single family residence with about 15 tall fir trees in the backyard and which is surrounded on the south by two abandoned single family homes and a new duplex; on the west by a commercial site and on the north by an old apartment complex. The existing home and all trees will be removed to make way for the development. It is situated on the west side of 76th Av W about 100' north of 232nd St SW. The site slopes from west to east in general but specifically about Zfeet from north to south at 2.5% slope. To make access into the site some minor grading will be necessary for the 24' wide driveway/sidewalk. This apartment complex will take access off 76th Av W using an asphalt driveway along the north property line. No rockeries or retaining walls will be needed, but will make use of the existing 2' concrete wall along the south property line. Generally the site is flat. A SEPA checklist for this development will be submitted by the owner. . A 33" detention pipe is parallel to the north property line and will drain along a "bumped over" storm drain extension at 3' east of curb face at the front of site. The drain is moved over because an intefering sewer manhole on its alignment. See DHA sheet C.1/3. The downspouts will drain into the two storm filter vaults for water quality before draining into the restrictor manhole be detained and then go south along the new storm drain extension to join the existing CB noted above. Also the foundation drains can go into the detention pipe since the pipe is about 1.5' below the foundation. The access will use the full 27wide driveway from face of duplexes to north property line for utililties and vehicle - pedestrian access. This corridor will service all utilities including storm, sewer, water for fire and domestic, power, telephone, cable and gas. The driveway will be with reverse crown so that the north side of the driveway slopes at 2% to gutter as shown in section A -A and at 13.3% maximum to the steepest approach to garage floor on the south side of driveway. The apartment configuration is this - that the first floor drops 6 inches into the garage. From the living space the hard landscaping will be accessed with steps in the back, drop about 2' to the concrete and trail off to elevation 376 at the existing 2' retaining wall at the south property line. . As can be seen in the profile the driveway will drain east and west from the crest at the east 1/3 point and drain into the two storm filter vaults for water quality. B. Offsite Analysis Seventy-sixth Av W rises going north for about 1600' to the site which is close to the crest and then drops about 40' in about another 1500' to join Pacific Highway on askew angle. The site is about 100 to 200'south of this crest. 'The first catch basin that drains the site basin is on the west side of 76th at the north side of 232nd St SW. See the topographic map by Emerald Land Survey. This basin drains south along 76th to the existing CB on the northwest corner of 76th/232nd St SW continues south in 76th Av and then goes east to Lake Ballinger at about 236th St and of course Lake Ballinger drains south in Macaleer Creek to Lake Washington in about 3 miles. The soils map as shown on page 213 by SCS shows that the site is mostly in type C soil and is typed as Alderwood Urban Land Complex, 2 to 8% sloping. The soil is drainable, but is only shallow to about 24 to 36" deep before the soil consolidates into glacial till. In addition City standards map allowing infiltration does not cover this area and therefore, infiltration is not allowed in this area. Part 11 Drainage Design for the Grading Plan A. Detention Design Calculations A calculation of impervious surfaces for both existing and developed - conditions to determine the detention volume for the 10 and 100 year storm for this townhome development is shown on page 2A, the Hydrograph Input Calculation Table. DEAN HOUGH & ASSOCIATES 30-OcI-03 HYDROGRAPH IMPUT CALCULATION TABLE: CITY OF EDMONDS: SCLTOWNHOMES ADDRESS: 23124 76th Ave W IMPERVIOUSIPERVIOUS AREA CALCULATIONS: DEVELOPED CONDITIONS RA1qr I LOT NO. I LENGTH WIDTH TOTAL AREA LENGTH WIDTH TOTALAREA LENGTH WIDTH TOTALAREA LENGTH WIDTH TOTALAREA 1 46.21 43 119m.t$ 0 0 0 1 0 0 0 0 1 462 43 1986.6 0 0 0 0 0 0 0 --43 462 —1986.6 0 0 0 462 43 1988.6 0 0 0 0 01 u I 462 43 1986.6 0 9 0 00 0 0 0 0 o TPER —Aumcm 6964 0 0 AREA DESCRIPTON/REMARKS bUb 1U IAL imrmmv. aum—�. TOTAL IMPERV. SURFACE = 16897.0 SQ FT.= 0.388 ACRES LENGTH WIDTH TOTAL AREA TOTAL PERVIOUS SURFACE = PROJECT AREA - IMPERV SURFACE 0.169 AC. PROJECT AREA (SO FT)= 303.251 80 24260 SO FT 0.557 ACRES ADD NEW RD PAVING & SIW= 0 SO FT PROJECT AREA + NEW RD= 24260 SO FT 0.557 ACRES IMPERVIOUSIPERVIOUS AREA CALCULATIONS: EXISTING CONDITIONS —A— RAIQ� LOT NO. LENGTH I WIDTH I TOTAL AREA LENGTH WIbfR— I TOTAL AREA LENGTH WIDTH TOTAL AREA DTH TOTAL AREA 62.11 28.31 1757.43 100.61 1!E 0061 101 105 121 480 01 31 282 TOTAL IMPERV. SURFACE 3630.4 SO FT.= 0.083 ACRES TOTAL PERVIOUS SURFACE = PROJECT AREA - IMPERV SURFACE 0.474 AC. 10.5 = 1.01 110 2.0" L1100 100" FOR R/D DETENTION THRESHHOLD CALCS: TIME OF CONCENTRATION: USE FOLLOWING PARAMETERS FLOW TYPE LENGTH U/S ELEV. D/S ELEV SLOPE SURFACE TYPE I SHEET 1801 379.11 3751 0.022812nd Gr Forest I I I I i Cn = I SHALLOW I I I Cn = Hydin2308.1231 AREA DESCRIPTONIREMARKS Ex. shed Ex conc. patio =x. sidewalk COMPOSITE Cn CALCULATIONS: For developed conditions 81 FOR SURFACE TYPE: 2ND GROWTH FOREST AREA OF SURFACE 90 FOR SURFACE TYPE: 50-75% GRASSED AREA AREA OF SURFACE PAGE 2A 0.474 ACRES 0.083 ACRES 0.169 ACRES 0.388 ACRES IN% The above noted table shows that the proposed impervious area includes the driveway, apartment buildings and street improvement areas which is zero, and that the existing condition involves second growth forest of alders with no impervious surface eventhough there is a concrete driveway and the existing house. The area of the access driveway paving (shaded area) including sidewalk was determined by Autocad. Also.on this table the storm: intensities for the City of Edmonds is listed. The curve numbers of 980nd 81 for impervious and second growth forest were used here. After development the Cn rises to 90 for 50 to 75% grass on this type C soil. The route that water travels on site is indicated on page 1 of Appendix A as sheet flow from the nort ' h property line of the site going somewhat on a diagonal southwesterly to the south property line for 180 feet through second growth forest at 2.3% slope. The actual'time for flow to go this distance using sheetflow becomes�A,7.6; minutes. TheWaterworks software determines the peak 100 year storm peak flow on site in Basin A by creating six hydrographs See page I and 2,.&�Appendiix.'.A. The Waterworkscalculations shoWs-that there is about 0.23� cls increase in the. 100 year - 24 hour peak in storm -flow. . HERE A BYPASS AREA OF 0.01 ACRES IS ALLOWED ON THE. BASIS THAT THE EXISTING RELEASE RATES ARE REDUCED BY THE AMOUNT NOT DETAINED BUT ALLOWED TO SURFACE FLOW OFF SITE. S EE PAGE 3D FOR THE DRAINAGE AREA. FOR THE BYPASS AREA THE STANDARD TIME OF CONCENTRATION OF F10 MINUTES WAS USED. SEE APPENDIX A - PAGE 2 FOR THE BYPASS FLOW. THIS WAS DEDUCTED FROM THE EXISTING RELEASE RATES AND THE FULL RELEASE RATES ARE SUMMED UP AND THESE HYDROGRAPH -RESULTS ARE SHOWN ON PAGE 3 OF APPENDIX A. THIS INCREASE THE WATER LEVELS 0.20'AND REDUCED THE ORIFICE SIZES TO THAT SHOWN ON PAGE 5. It should be noted that the time for flow concentration for developed flows will be faster off site than the existing conditions since developed I conditions will have a higher impervious area. With the minimum standard time of 10 minutes, the hydrograph for the developed conditions is maximum and will provide the greatest possible difference and amount of storm flow to detain to protect the existing downstream structures. The calculation of detention calls for 260' of 33" diameter pipe or 1544 cu ft.; therefore, the actual 258' of 33" diameter pipe provides 1536 cu'. Ft and the volume in the three type 11 manholes which is not included in the , Waterworks volume calculations provides 50 cu ft needed to fulfill the total required volume of 1544 cu ft. See Page 5 for orifice sizes and location 3 THE ON AND OFFSITE DRAINAGE BASIN MAP ON & OFFSITE BASIN AREA 1.61 AC.---, EX. APT BLDG I DEIENTION PIPE BENT/MARK: SSMH 2 SEWER MA114 NEW I > Ssm p I #4 f-C IF 10' PUDIEJ SEMEN b to P 9 p Ej p z F/ .1 1 / 9 t /Co o UNIT 58 lj IT T 4 'UN jklT 3B A UNIT/,2A UNI" 113 U N 1 0 Id HARD FCAK z 8XI 0 F JdC�L: L J S. F E�N 3- 9*44� 30' #1 'IT 41�/2A �p UlNllt/� /u E)L OUR EX 0 Am" THE > P T CO' LO, OC T,l� EX HOUSZ EX HOUSE (.0 1�71 co /232ND S/T S,,W EX NATURAL DISCHARGE PMT* EX. C8-- PAGE 3A mmfl�m K \ACAD98\SCL-76TH\C2306PLSl.DWG 10/31/03 FIGURE 4.2.1.F NOMOGRAPH FOR SIZING CIRCULAR DRAINS FLOWING FULL 1,000 900 800 700 600 411111 Hiff, 300 200 —100 --w- 90 Z- 80 =-70 ui —60 L50 40 w a cc 30 x 0 CD E5 �7 20, 10 m K 1 9 8 7 6 120 —108 —78 —72 —66 —60 —54 co —48 w — 42 Z —36 z. —33 w —30 a- —27� 0- 24 LL 0 —21 — 1 cc )1 w w 2 —180( —15 12 1-10 .0001 —2.0 .0002 .0003 Minimum AJlowable .0004 .0005 .0001 Velocity .0006 (FlovAng Z-3.0 *0008 .0002 Full) CM .001 q .0003 0004 002 0005 -4.0 Cr .0006 — 0 .00: .0008 LL w . 004 .001 5.0 a. .005 0 .006 00 uud .01 .002 .003 C1.1 Z.- 0 0 co L6. 0 .004 Er Cc .02 .005 0 w 0- -7.0 .006 LL - .03 .008 Li -8.0 .04 .01 w LL - .05 CO 9.0 .06 Z .020 10.0 10 .030 0 .040 1 .050 w > .060 .080 .100 SAMPLE USE 8 247 dia. CMP @ 2% slope yields 1 7cfs @ 5.4 fps velocity 6 (n--0.024) 4 Values per Manning's equation Q-- 1--49- ) AR2/3 S 1/2 3 n This table can be -converted to other"n"values by applying 2 formula: Q1 n2 Q2 nl 1 PAGE 3B BYPAgS AREA MAP 3' �TS -z n I (elevation) and page 6 for peak water level for both storms FOR THE - ENLARGED DETENTION VOLUME TO ALLOW BYPASS. The actual volume used OF 1484 cu ft IS FOR THE FINAL DETENTION VOLUME. The water level is below the top of pipe BY 0.23' below soffit. B. Culvert Conveyance Analysis To check available capacity for the new pipe going from site that joins the existing pipe to the existing manhole, the full developed 100 year-24 hour on site storm flow of 0.34 cfs for 0.4 acres. See Appendix A - page 1. Combine this with the upstream flow coming south along 76th Av W from site and CB #2 (type 1) to test the new storm drain pipe. See page 3A for drainage basin that contributes to the nearby CB which is 1.6 acres. Even at 4 times the onsite flow of 0.34 cls or 1.4 cls it will not test the new pipe which will hold 4.8 cfs under normal uniform flow conditions and at 1.5% slope. See page 3B Nomograph to determine the normal uniform flow handled by this pipe at 1.5% slope and 12" in diameter being smooth wall inside. Since the pipe will be more than adequate to contain the projected onsite storm flow and even upstream flow, no conveyance is presented here other than the above nomograph study of capacity for the new storm drain extension along 76th Av to the site. See sheet C2/3 for the plan and profile of the storm drain extension. C. Water Quality Design for Storm Filter Vauft Two water quality storm filter vaults or catch basins are used here. Water quality standards requires that the 6 month water quality storm to be infiltrated in the water quality system if the storm filter vault(s) is used. See Appendix B - page 1 for the 6 month storm hydrograph. Since the driveway pavement is crested at the east 1/3 point in the driveway, 70% of the drainage goes west to the 2 cartridge unit and the east 30% of the flow goes to CB # 3A 1 cartridge unit. The following is the calculation of flow and calculation of number of cartridges needed to filter the 6 month storm for this site: R = rate per cartridge = 15 gal/min. Q-0.5 = 0.08 Cu Ft/sec (see Appendix B - page 1) N = # of cartridges needed for site = (0.08 x 449 gpm/cfs)/l 5gpm = 2.4 At 70% of the flow # of cartridges used in CB #4A = =(0.08x449)*0.7/15 = 1.7 units or 2 units rounding up. AT 30% of the flow # of cartridges used in CB #3A = =(.O8x449)*0.3/15 = 0.7 units or 1 cartridge rounding up. C1 This catch basin filter system contains 3 chambers; one to distribute the incoming water through the grate over a weir system into the cartridge chambers. When the water rises to the bottom of the cartridge water flows through the media, which is perlite - an inert material which will filter out sediment and oil from crankcase droppings. Once through the media it goes to the core drains down through a piping sytem and out and in our case to the detention piping. The oil going through the cartridge will be absorbed on the perlite material and keep the water flowing through clean and without pollutants. C2 Maintenance of the cartridge is fairly simple: the covers over the cartridge chambers are removed along with the cartridge and the cartridge needs to be replaced from time to time. Storm Water Management, the manufacturer, will inspect, maintain the system catch basins after built and certify its operation and maintenance. Thereafter, the owner will of this development will be required to check to make sure that flow through the system is adequate and working on a 3 month basis. He may have to replace the cartridge on a year to 2 year basis. The above calculations show that the two Cbs are more than adequate to handle the 6 month water quality storm of 0.08 cfs. It is anticipated that the cartridges will need to be replaced more like 2 years, depending on the pollutants generated after construction. Waterworks Printouts: A. Detention Design Calculations page 1-6 B. Water Quality Design Hydrograph page 1 C. Storm Filter Catch Basin Detail: 2 Cartridge CB SEE SHEET 3A Palbackupnohjs&%wkhvofdprot.c23OBrPLhNP llrSM&3110104 3/10/04 12:49:33 am Dean Hough & Associates page 1 EDMONDS: FOR SCLENTERPRISES, LLC Address:23116 76TH AV W - 5 TOWNHOMES APPENDIX A:DETENTION DESIGN:10/100YR 24H BASIN SUMMARY BASIN ID: A100DEV SCS METHODOLOGY TOTAL AREA ....... : RAINFALL TYPE .... : PRECIPITATION .... : TIME INTERVAL .... : NAME: BASIN A DEV. COND. 100YR-24HR 0.56 Acres TYPElA 3.00 inches 10.00 min ABSTRACTION COEFF: 0.20 PEAK RATE: 0.34 cfs VOL: BASIN ID: A100EX SCS METHODOLOGY TOTAL AREA ....... RAINFALL TYPE-.': PRECIPITATION .... : TIME INTERVAL .... : BASEFLOWS: AREA. . : CN .... : TC .... : 0.00 cfs PERV 0.16 Acres 90.00 10.00 min 0.11 Ac-ft TIME: 500 min NAME: BASIN A EX. COND. 100YR-24HR 0.56-Acres TYPElA 3.00 inches 10.00 min BASEFLOWS: AREA. . : CN .... : TC .... : 0.00 cfs PERV 0.56 Acres 81.00 47.63 min ABSTRACTION COEFF: 0.20 TcReach - Sheet L: 180.00 ns:0.4000 p2yr: 1.50 s:0.0228 PEAK RATE: 0.11 cfs VOL: 0.06 Ac-ft TIME: 530 min BASIN ID: A10DEV SCS METHODOLOGY TOTAL AREA ....... : RAINFALL TYPE .... : PRECIPITATION .... : TIME INTERVAL .... : NAME: BASIN A DEV. COND. 10YR-24HR 0.56 Acres TYPElA 2.00 inches 10.00 min ABSTRACTION COEFF: 0.20 PEAK RATE: 0.21 cfs VOL: BASIN ID: A10EX SCS METHODOLOGY TOTAL AREA ....... : RAINFALL TYPE .... : PRECIPITATION .... : TIME INTERVAL .... : BASEFLOWS: AREA. . : CN .... : TC .... : 0.00 cfs PERV 0.16 Acres 90.00 10. 00 min 0.07 Ac-ft TIME: 500 min NAME: BASIN A EX. COND. 10YR-24HR 0.56 Acres TYPElA 2.00 inches 10.00 min BASEFLOWS: AREA. . : CN .... TC .... 0.00 cfs PERV 0.56 Acres 81.00 47.63 min ABSTRACTION COEFF: 0.20 TcReach - Sheet L: 180.00 ns:0.4000 p2yr: 1.50 s:0.0228 PEAK RATE: 0.04 cfs VOL: 0.03 Ac-ft TIME: 530 min IMP 0.40 Acres 98.00 10.00 min IMP 0.00 Acres 0.00 0.00 min IMP 0.40 Acres 98.00 10.00 min IMP 0.00 Acres 0.00 0.00 min 3/10/04 12:49:35 am Dean Hough & Associates page 2 EDMONDS: FOR SCL ENTERPRISES, LLC Address:23116 76TH AV W - 5 TOWNHOMES APPENDIX A:DETENTION DESIGN:10/100YR 24H BASIN SUMMARY BASIN ID: OFF100YR NAME: OFFSITE RELEASE BASIN100YR24HR SCS METHODOLOGY TOTAL AREA ....... : 0.01 Acres BASEFLOWS: 0.00 cfs RAINFALL TYPE .... : TYPElA PERV IMP PRECIPITATION .... : 3.00 inches AREA..: 0.00 Acres 0.01 Acres TIME INTERVAL .... : 10.00 min - CN .... : 0.00 98.00 TC .... : 0.00 min 10.00 min ABSTRACTION COEFF: 0.20 PEAK RATE: 0.01 cfs VOL: 0.00 Ac-ft TIME: 500 min BASIN ID: OFF10YR NAME: OFFSITE RELEASE BASIN 10YR24HR SCS METHODOLOGY TOTAL AREA ....... : 0.01 Acres BASEFLOWS: 0.00 cfs RAINFALL TYPE .... : TYPElA PERV IMP PRECIPITATION .... : 2.00 inches AREA..: 0.00 Acres 0.01 Acres TIME INTERVAL .... : 10.00 min CN .... : 0.00 98.00 TC .... : 0.00 min 10.00 min ABSTRACTION COEFF: 0.20 PEAK RATE: 0.00 cfs VOL: 0.00 Ac-ft TIME: 500 min 3/10/04 12:49:36 am Dean.Hough & Associates page EDMONDS: FOR SCL ENTERPRISES, LLC Address:23116 76TH AV W - 5 TOWNHOMES APPENDIX A:DETENTION DESIGN:10/100YR 24H HYDROGRAPH SUMMARY PEAK TIME VOLUME HYD RUNOFF OF OF Contrib NUM RATE PEAK HYDRO Area cfs min. cf\AcFt Acres 0.036 850 3099 cf 0.56 2 0.100 590 4992 cf 0.56 3 3/10/04 12:49:36 am Dean.Hough & Associates page EDMONDS: FOR SCL ENTERPRISES, LLC Address:23116 76TH AV W - 5 TOWNHOMES APPENDIX A:DETENTION DESIGN:10/100YR 24H STORAGE STRUCTURE LIST UNDERGROUND PIPE ID No. S1 Description: STORAGE PIPE, S1 Diameter: 2.75 ft. Length: 260.00 ft. Slope... : 0.0000 ft/ft upstr: dnstr: 4 3/10/04 12:49:36 am Dean,Hough & Associates page 5 EDMONDS: FOR SCL ENTERPRISES, LLC Address:23116 76TH AV W - 5 TOWNHOMES APPENDIX A:DETENTION DESIGN:10/100YR 24H DISCHARGE STRUCTURE LIST MULTIPLE ORIFICE ID No. OR1 Description: ORIFICE STR. OR1 Outlet Elev: 372.00 Elev: 370.00 ft Orifice Diameter: 0.9990 in. Elev: 373.90 ft Orifice 2 Diameter: 1.6289 in. 3/10/04 12:49:38 am Dean Hough & Associates page 6 EDMONDS: FOR SCL ENTERPRISES, LLC Address:23116 76TH AV W - 5 TOWNHOMES APPENDIX A:DETENTION DESIGN:10/100YR 24H LEVEL POOL TABLE SUMMARY MATCH INFLOW -STO- -DIS- <-PEAK-> OUTFLOW STORAGE < -------- DESCRIPTION --------- > (Cfs) (efs) --id- --id- <-STAGE> A (cfs) VOL (cf) 10 YEAR STORM DESIGN ......... 0.04 0.21 Sl OR1 373.77 1 0.04 1050.06 cf 100 YR STORM DESIGN .......... 0.10 0.34 Sl OR1 374.52 2 0.10 1483.57 Cf 10/21/03 4:55:16 pm Dean Hough & Associates page 1 EDMONDS: FOR SCL ENTERPRISES1 LLC Address:23116 76TH AV W - 5 TOWNHOMES APPENDIX B:WATER QUALITY:6 MON 24 HR-DEV BASIN SUMMARY BASIN ID: AO.5DEV NAME: BASIN A DEV. COND. 6 MON 24HR SCS METHODOLOGY TOTAL AREA ....... 0.56 Acres BA$EFLOWS: 0.00 cfs RAINFALL TYPE .... TYPElA PERV IMP PRECIPITATION .... 1.00 inches AREA..: 0.17 Acres 0.39 Acres TIME INTERVAL .... 10.00 min CN .... : 90.00 98.00 TC .... : 10.00 min 5.00 min ABSTRACTION COEFF: 0.20 PEAK RATE: 0.08 cfs VOL: 0.03 Ac-ft TIME: 500 min Aug 23 04 10:00a 0. 1 CIYIL EN611VEERING By DHA DEAN HOUGH & ASSOCIA TES August 23, 2004 To: Lyle Chrisman/Engineering Program Mgr/City of Edmonds DSD From: Dean M Hough, Pf i Re: SCL Enterprises Townhomes @ 23124 76th AV W Pipe Size Revisi6n According to a conversation with Don Fiene this date, it is OK to use the larger 36" N1 2 pipe for detention system in place of the 33" called out on the approved plan and which is not manufactured in this size. This will change the restrictor configuration to the following: Maximum water 4urface(top of restrictor pipe) is: 374.27 100 yr orifice size changes to: 1.77' dia. at New orifice elevation: 373.80 10 yr orifice size bhanges to: 1.01" dia. at same orifice elevation noted on C1/3 restrictor detail: 372.00. Everything else i 6 the detention system remains the same as approved. The actual length of R/D pipe from inside of manhole to inside of manhole will be 257,37'; therefore, use 258' of N 12 pipe and cut to fit the manhole stationing shown on sheet C 113. If there is any question, feel free to call me at 425-335-0262. I P3:bwlowsANorMwrdwak230ftemr-d-l" 8918 11 th St NE Everett, WA 98205-1407 Phone & Fax: 425-335-0262 Civil Engineer Lie# 17021 City of Edmonds Permit No4V 077 RIGHT-OF-WAY CONSTRUCTION PERMIT issue Date: A. Address or Vicinity of Construction: 12-1-N VJ B. Type of Work (be specific): UTI U Tol (t,) !%WJ.,4-rJ L-A g1f.) ftuc�og� 15� C. Contractor: Contact:— 1_all�l Maifing Address: 17,f.?l 4,,4,� 4. le 41 3;/,,, 4* P h o n e: State'License -SC Z 0-0 h< Y Liability Insurance: Bond: $ 0V D. B11111ding Pen -hit # (if applicable): Side Sewer Permit # (if applicable): E. FT - Commercial Subdivision City Project E] EUC (PUD, VERIZON, PSE, AT& T, OVWD) Multi -Family El Sil le Fa il El Other fNSPECTOR: F. PAVEMENT CUT: F-1 YES [I No G. SIZE OF CUT x CONCRETE CUT: El YES El NO AN'LICANT TO IZEAD AND SIGN INDEMNITY. . Ahplicant understands by his/her signature to t ' his application helshe holdi the City of Edmonds harmless from i . nj . uri . es, damages or claims of any kind or. description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any o f iis departments or employees, including but not limited to the defense of any legal proceedings including defense costs and-atiorneyfees by reason ofgranting thispermit. THE CONTRACTOR IS, RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOLLORING THE FINAL INSPECTION AND ACCEPTANCE OF THE WORK. ESTIMATED RESTORATION FEES KILL BE HELD UNTIL THE FINAL STREET PATCH IS COMPLETED BYCITYFORCES, AT WHICH TIMEA DEBITOR CREDITR7LL BEPROCESSED FOR ISSUANCE TO THEAPPLICANT. # traffic control and,public safety shall be in accordance with City regulations as required by the City. Engineer. Every flagger must be traifiid as required by (WAC) 296-155-305 and must have certification *verifying completion of the .required training in tfil6ir possession. # Res - toration is to be in 'accordance with City codes. All street -cut trench Work shall be patched with asphalt or City - approved material prior to the end of the workday - NO EXCEPTIONS. # Three sets of constructiondrawings of proposed work are requiredwith the permit application. CALL DIAL -A -DIG (1-800-424-5555) PRIOR TO BEGINNING WORK I HA VE READ THE ABOVE STATEMENTS AND UNDERSTAND THE PERMIT REQUIREMENTS AND ACKNOWLEDGE THA TI MUSTMAKE THE PINK COPY OF THE PERMITA PAILABLE ONSITE A TALL TIMES FOR INSPECTIONS Signature: or. Agent), Date: FOR CITY USE ONLY K Approved by: A(z Right-of-way Fee: Time Authorized: Void After 4/ Disr*uption fee/Fund I I I: W4�80 Special Conditions: JIW-Otu 4uTa,,,4 Ka?b U0 Sr 'Restoration Fee: Fwo,) AWar>)-10 A,�W. 4kW Vw, lt�VleVnnkh Total Fee-:N(655 T W-f, AAVAbp G049. Receivt No: c�2 -tl 7g:OK 9 TAW. issue' d byl:. 1�/ ,(t?rs*U W aseb 4w,- _4TCUTS :�,Yso LIM I TA"14 1�5�LL '7t0*NAVtf- TL;-15T&, �,, , P" UPON COM PLETION OF PERMITTED WORK, AN ENGINEERING FINAL INSPECTION IS REQUIRED PER CHAPTER 18.0.0 OF THE EDMONDS COMMUNITY DEVELOPMENT CODE (P ne 425�. 1-0220, Ext..1320 r 01 �7 FINAL APPROVAL OFPERMITTEDWORK. DATE:�qL� C=�__%s'je�7®r sSFiinature For inspection.requirements see Engineering Inspection Information handout. . T NO WORK SHALL 111'�GIN I'IZIOIZ TO PERMIT ISStJANCE I 4" Ji Perniit No: 01 City, of Edmonds 02!LM'F7(,o i —7-OT RIGHT-O&WAY CONSTRUCTION PERMIT Issue Date: A. Address or Vicinity of Constructi A L) c Ld B. Type of Work (be specific): �Qca S I cx, VA AV L A 5 a-5b Z)T Di�A' t�� _D�VA `)i(ie"A_)oXV' 9 C, Contractor: Contact: 5L),e31"C\1C_Y, dess MailingAddress: �413az I AL) J Phone: a6c-, - L/ I �i - 4,;)'�)-1 �OCP - H I.S - qj,�`7 P 4'.";'-1"-'StAie,License#: _P1 I V n . �1- 0 '? oe Liability Insurance: Bond: $ ;�. n -City Business License #: U D. Building Permit # (if applicable): Side Sewer Permit # (if applicable): E. F� Commercial E] Subdivision 0 City Project E] EUC (PUD, VERIZON, PSE, COMCAST, OVWSD) Multi -Family Single Family Other INSPECTOR: %A\Al K I ealy -L F. PAVEMENT CUT:. E] YES [:1 NO G. SIZE OF CUT x CONCRETE CUT: F� YES n NO G. E] Mail Approved Permit Call for Pickup APPLICANT TO READ AND SIGN INDEMNITY: Applicant understands by hislher signature to this application helshe holds the City of Edmonds harmless from injuries, damages or claims of any -kind or description whatsoever, foreseem or unfo reseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorneyfees by reason ofgranting this permit. THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL _INSPECTION �ND ACCEPTANCE OF THE WORK. ESTIMATED RESTORATION FEES WILL BE HELD UNTIL THE FINAL STREET PATCH IS COMPLETED BY CITY FORCES, AT WHICH TIMEA DEBITOR CREDIT WILL BEPROCESSED FOR ISSUANCE TO THEAPPLICANT. Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by (WAC) 296-155-305 and must have certification verifying completion of the required training in their possession. Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City - approved material prior to the end of the workday - NO EXCEPTIONS. Three sets of construction drawings'9f proposed work are required with the permit application. CALL D1,A1-',A­DIG (1��800; 424-L5555)` PMOR TO BEGINNING WORK I HA VE READ THE ABO VE STA TEMENTS AND UNDERSTAND THE PERMIT REQ UIREMENTS AND A CKNO WLEDGE THA T I MUST MA KE THE PINK COPY OF THE PERMIT A VAILABLE ON SITE A T ALL TIMES FOR INSPECTIONS Signature: Date: C) (Contractor orAgen.t)- Ri ht -Approve Y: of;*i�,.-Fee db A Time Authorized! Void After' Special Conditibns: A 0 'r?� - L� *_4 A�rs A dJ; - L-5—e- 'rLL 14 0 �0^f /_'N 0 7—/ At.t�4rAjm Q .1otarree: -4 't, N #-7A K iA r 10" kr-11i, /4u. C I r V 6ir 60'44,v Recei' J _12 u7-1 w rle!'S (WA rek. SA -\i'f - 14,4, 1"'AlLig, imlicity:'.' A 7�C A _4A" Z:&-I—r zlu ;'4'5 -6 iv. A r '1—N4F 'Sr6 tQ- A jA I j;w 13 REQUIRED INSPECTIONS: Call 425-771-0220, Ext. 1326for a 24-hour FINAL APPROVAL OF PERMITTED WORK: C- S v7) #� A 7- 1 ON n request line. DATE: 's Siinature t 0 CADocurnents and SettingsTurtisNy Documents\Fonns\Engnmi\ROWpemit_.doc Rc�ised 10/01/03 Pilchuck Contradtors, InC. � 678 Job # 106131 June 2, 2004 Sheet 1/1 Rob IngIls4 av3HY MHOM 'OVOM 03SO13 V31MONS V3W,kVMVMQL = M =� E)NIXWd MI PRIVATE RD t 41 50' —PM—K —IN G- — T--fe MWAMYAPEA E SIDEWALK CLOSED CRANNEMAXION DEACE SPACING MPH MR TANGENT 50/70 40 80 35/45 30 60 25/30 20 40 21 21, ;�PPROVED AS NOTED BY ENGINEERING Date: -f/ '7/0 Notes: 1. Ail signs and spacing to cor,!orm to the MUTCD and City of Edmonds Traffic Control specs. - z 2. Channelizing devices are 28" traffic cones. 4. All signs are 48" x 48" B/O unless otherwise specified. 5. Alert affected residents. ;71 LU %0 N 3'X 6'WORK AREA IN PKG. SHOULDER OF 76th AVE W --�HEROAD WORK AD AHEAD LEGEND 0 28" TRAFFIC CONE WORKAREA TRAFFIC FLOW ARROWBOARD 2" INLINE TEE -- 469'S CL & 158'W CL (---')S CL (---')W CL 2" x 1 114 PE REDUCER 468'S CL & 158'W CL (___')S CL (---')W CL 2" INLINE TEE 469'S CL & 213'W CL ( --- 1)S CL (---')W CL 2"x 1 114" PE REDUCER 468'S CL & 213'W CL ')S CL (---')W CL 2" INLINE TEE 469'S CL & 268'W CL ( --- I)s CL (---')W CL 2"x 1 114" PE REDUCER 468'S CL & 268'W CL (_--')S CL (---')W CL EOM 2" PE CAP 469'S CL & 326'W CL (_--')S CL (---')W CL PROPOSED 2" PE IP MAIN 469'S CL (---')S CL INSTALL 27' OF 1 114 " PE IP MA IN (T YPICA L) EOM 1 114 PE CAP 434'S CL & 268'W CL ( --- 1)S CL (---,)W CL EOM 1 114" PE CAP 434'S CL & 213'W CL ( *)S CL (---')w CL EOM 1 114 PE CAP 434'S CL & 158'W CL (___ ')S CL (---,)W CL S 20' R/W 1 10, I 10, PROPOSED GA5 1 6 5', SEWER CROSS SECTI ON OF B-B PVT RD SCALE: 1 " = 10' i r n> 230TH ST SW n--, (UO� cum 2"x 1 114" PE REDUCER 46B'S CL & 103'W CL ')S CL :9 *)W CL C14 '0 cnc rn 04 2" INLINE TEE to �2 469'S CL & 103'W CL C'i (---')S CL ')W CL --- CIA C14 Z"Z .. . . ............. VT ROAD Xi UNIT UNIT; UNIT. UNIT 1, UNIT UNIT! I .4B 3B 2B I 1B 1A 5B a -e, UNIT UNIT 'UNIT Ur 2A 3A A 4A A START OF JT 2" FE VALVE 469'S CL & 32'W CL (---')S CL (---,)W CL TIE- IN 2" BRAJVCH SADDLE 469'S CL & 28'W CL .)s CL (---,)W CL 518" 243'N T00-3 W 518" 243'N c4 1998 A STANDARD GAS CONSTRUCTION NOTES: 1. ' FIELD LOCATE ALL UNDERGROUND UTILITIES. CALL "ONE -CALL' TWO WORKING DAYS PRIOR TO CONSTRUCTION. IN INESTERN WASHINGTON CALL: 1-800-424-5555. IN KITTITAS COUNTY CALL: 1-800-553-4344 2. ALL CONSTRUCTION IS TO CONFORM TO PSE GAS OPERATING STANDARDS AND GAS FIELD PROCEDURES. 3. EROSION AND SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 TECHNIQUES FOR TEMPORARY EROSION AND SEDIMENT CONTROL AND ANY ADD11IONAL LOCAL JURISDICTION REQUIREMENTS. 4. NOTIFY PROPERTY OWNERS ADJACENT TO PROPOSED CONSTRUCTION ACTIVITIES A MINIMUM OF TWO WORKING DAYS PRIOR TO BEGINNING CONSTRUCTION. USE IS! TO DISTRIBUTE FLYERS IF JOB IS LARGE, OTHERWISE HAND DELIVER FLYERS BE SURE TO INCLUDE THE LIST OF FREQUENTLY ASKED QUESTIONS AND INFORMATION ABOUT THE OPPORTUNITY TO PURCHASE AN EXCESS FLOW VALVE WHEN THEIR SERVICE IS INSTALLED OR REPLACED PER GAS OPERATING STANDARD 2550.1600. ALLOW ADEQUATE TIME FOR CUSTOMER DECISION AND RESPONSE. 5. ANY CHANGE IN ROUTE, TIE-IN METHOD OR ADDITIONAL MAIN FOOTAGE MUST BE APPROVED BY PSE GAS ENGINEERING SERVICES. E FACILITIES. CHECK BOX ON REPORT FOR WIRE 6. COMPLETE "PIPE CONDITION REPORT" ON ALL EXPOSED EXISTING PS BOX (TEST LEAD) INSTALLATION. 7. ACTIVE SERVICES DENOTED BY: 8. PIPELINE MARKERS AND WARNING SIGNS SHALL BE INSTALLED AND RECORDED BY THE CONTRACTOR PER PSE GAS OPERATING STANDARD 2525.2500. 9. VALVE MARKERS SHALL BE INSTALLED AND RECORDED BY THE CONTRACTOR PER PSE GAS OPERATING STANDARD 2525.2600 FOR ALL HP VALVES IF THE LOCATION IS NOT REDILY ACCESSI&E, AND FOR ALL VALVES WHERE PERSISTAN T SNOWFALL MAY OBSCURE THE VALVE BOX - `10. TO PREVENT ACCIDENTAL OVERPRESSURE OF ADJOINING SYSTEMS. NO TWO MAINS SHALL BE CONNECTED EXCEPT AS SHOWN ON THIS DESIGN UNLESS APPROVED BY PSE GAS ENGINEERING SERVICES. 11. SYSTEM MAOP DENOTED BY: rSYSTEM MAEPP = -45- PSIG 12. RESTORE ALL DRIVEWAYS SUBJECT TO OPEN CUT TO ORIGINAL OR BETTER CONDITION. 13. GAUGE AND MONITOR USE OF ALL STOPPERS AND SQUEEZES TO ENSURE ADEQUATE FEED. (USE MANOMETER FOR . LP SYSTEMS) 14. PURGE POINTS AND PRESSURE TAPS TO BE INSTALLED PER PSE GAS OPERATING STANDARDS 2525-3400, AND 2525.1200. EOM 584'S 30' 30' PVT ROAD R/W R/W cum CUN 234TH ST SW TYPICAL MAINLINE JOINT TRENCH DIMENSIONS R1W or Excavated PROPERTY LINE Dirt P"a -Width varies per- 24" Min. Curb 81dewAlk Number of UtIfid" 12- Typical Final Grade 12" Min. 4" Min. EOM 114" PE CAP Inal 13ackflll..:.* Separation Separation 3V (No,ocks Cover 434 08 CL & 103'W CL overll"dla.).% Min. 48" )S CL 3" Min. Sand M a px W CL Location of roof drain 8" Min. Sand Shad... ower th Intercept (depth varies) Shading Over Gas t _3" Sand Bedding 1: NOTE: 4" separation if communications PLOT PLAN NOTE: Install 12" sandshoding over gas if the final backfill I SCALE: I" - 60T__ contains rocks greater than 611 diameter. Rocks greater than agree. Otherwise 12" separation are requirod. 10" In diameter are not permitted In the final backfill. Gas Phone a Cable Power NTS W 601 E N R/W Q R/W R/W 30' 30' 28' EXISTING GAti 15' 17' CC'%AIC'D WATPP CROSS SECTION OF A -A 76TH AVE W SCALE: 1 " _- 10' FITTER (CHECK BOX IF COMPLETE) Work area left in clean & Safe ondition Complete all Pipe Tables and Gas Pressure Stamp Field changes Red -Lined on as -built Material verified and Changes oted on paperwork All Valve & Tie-in Locations oted on as -built Note beginning of Main, EOM & Line of Main locations Show Rope Locations & Cul-de-sac Radius Foreman's Signature Company Date JOINT TRENCH PLAT NOTES: 1. NOTIFY APPROPRIATE PERMITTING AGENCY PRIOR TO JOB START (SEE PERMIT REQUIREMENTS). 2. ANY CHANGE IN ROUTE, PIPE SIZE/TYPE, TIE-IN METHOD OR ADDITIONAL MAIN FOOTAGE MUS BE APPROVED BY THE APPROPRIATE ENGINEER /PROJECT MANAGER. 3. INSTALL MAIN VALVES OUT OF TRAFFFIC WERE POSSIBLE. 4. INSTALL ONE POUND ANODE FOR EVERY 1000' OF LOCATING WIRE. INSTALL ANODE AND TEST LEAD WIRES PER PSE GAS OPERATING STANDARDS 2525.12 & 2525.23 5. MAINS AND SERVICES SHALL BE TESTED AND PURGED PER PSE GAS OPERATING STANDARDS 2525.33 & 2525.34 6. UNLESS OTHERWISE NOTED: ALL PIPES INSTALLED IN PLAT TO BE 2" PE-IP. ALL CROSSINGS TO BE YELLOW 4" PVC. ALL SERVICES TO BE 5/8" PE. DENOTES SERVICE STUB LOCATION. DENOTES FOOTAGE BETWEEN FITTINGS. 7. CUSTOMER TO DIG AND BACKFILL ON PRIVATE PROPERTY OR EASEMENT ONLY. TRENCHES MUST CONFORM TO PSE GAS OPERATING STANDARDS 2525.17. 2525.15 & 2525.16. 8. NOTE ALL RECORDABLE FOOTAGES, LOCATIONS AND MATERIAL CHANGES ON THE AS -BUILT IN RED. GAS MAIN INSTALLATIONIRETIREMENT Typefflork Pipe Size Type Estimated Length Actual Length Manufacturer TN-S-TALL JT 2" PE 302' INSTALL SCA 2" PIE 11 INSTA 111/4" PE 108- 1 GAS MAIN PRESSURE & TESTING TYPE TEST PRESSURE TESTED BY DATE ON TIME ON DATE OFF TIME OFF TYPE TEST PRESSURE TESTED BY DATE ON TIME ON DATE OFF TIME OFF [Design Press 60 SYS MAOp 45 PROJECT PHASE NOTIF# ORDER# 0 SAP Superior Service/Meter Service/Meter ServicelMeter Service/Meter Ind. Service Ind. MSA Dis. Reg. / FT HIP Svc/MSA Relocate Retirement X442830680 107020196 Contractor CONSTRUCTION COST CODES: 041-103-3 1 1 F Vicinity Map WORK SITE N! Al ."4: 2 S, .3 Th `31 r 1 Sit .3 1 T 5 Z . A V'4 OL k, "i 4 NOS 2003 WOMAA��BWS- UNS Owner / Developer Contact Info SCL ENTERPRISES TOWNHOMES 17921 LINDEN AVE N SHORELINE, WA 98188 ATTN: SHAUN LEISER 206-229-6038 office 4 CD CALL (600) 424-3555 Project Manager Contact Information: 2 BUSINESS DAYS BEFORE YOU DIG PATTI NESS THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF FACILITIES CELL: 425-327-2783 REAL ESTATE/EASEMENT PERMIT EMAIL: pattl.ness@pse.com CSE CITY OF EDMONDS REV# DATE BY DESCRIPTION FUNCTION CONTACT PHONE DATE 3 PROJECT MIGR PATTINESS 206-418-4237 5120104 2 ENGR-GAS DRAWN BY M.JOHNSON 200-418-4257 5120/04 I CHECKEDBY PATTI NESS 206-416-4237 5120/04 k, COUNTY EMER SECT GAS WK CTR APPROVED BY PATTI NESS 206-418-4237 5120104'-- CP APPROVAL SNOHOMISH 5 MCNSEG 1/4 SEC NW-32-27-04 OP MAP PLAT MAP 166.070 MAPPING NE-31-27-04 164.068 166.069 JOINT FACILITIES ARRANGEMENTS 0 0 UTILITIES SNOHOMISH CO. PUD VERIZON COMCAST CONTACTFCRAIG DEYOUNG BOB EMERY JENJACOBSEN I-] 171 PHONE#1 425.7834Q18 495% 308-7029 425-317-9601 SAP Superior Order: PUGET SCL ENTERPRISES TOWNHOMES (10 UNITS) 1070201196 - Drawling Number: SOUND 2" PE IP MAIN EXTENSION N/A ENERGY 23124 76TH "E W EDMONDS, WA 98020 SCALEt IPAGM DESIGNED BY PILCHUCK CONTRACTORS INC. r 0 5W Now� 1`141E 1/4p NE 1/4, SECTION 31, TOWNSHIP 27 NORTH, RANGE 4 EASTP___0 Womn FOUND REBAR w/ NO CAP — FOUND I.P. 0.1' SOUTH �.NIIN UWL IN REBAR RECORDER'S CERTIFICATE ................... filed for record this .... ...... day of .......... 20 ....... at ...... M. in book .......... of ........ at page .......... at the request of .............. I ........................... ........... I ......... ................... Mgr, Supt. of Records BRASS DISK (TYP) 230th ST SW NORTH LINE OF SOUTH 195 FEET SOUTH LINE TRACI' 234th ST SW SURVEYOR'S CERTIFICATE THIS MAP CORRECTLY REPRESENTS A SURVEY MADE BY ME OR UNDER MY DIRECTION IN CONFORMANCE WITH THE REQUIREMENTS OF THE SURVEY�ECORDING ACT Aj;!�EREQUEST OF (;kS*reWtA IZUP IN vtwr - OF CERTIFICATE NO, C-1 30' —EXISTING TK IN LEAD Ex. 10' ISewer Easement AFN 2378289 0 0 C� *r) 0 -4- Cal z )(—SET PK NAIL 0) 0 (IN FEET), 1 inch = 30 ft. LEGAL DES RIPTION NORTH 80 FEET OF SOUTH 195 FEET OF TRACT 16, SKELTON'S LAKE McALEER 5 ACRE TRACTS, ACCORDING TO THE PLAT THEREOF, RECORDED IN VOLUME 6 OF PLATS, PAGE 21, RECORDS OF SNOHOMISH COUNTY. SITUATE IN THE COUNTY OF SNOHOMISH, STATE OF WASHINGTON. EXCEPTIONS EASEMENT AND THE TERMS AND CONDITIONS THEREOF: Purpose: Sewer'Line Area Affected: East 10 Feet Recorded: March 20, 1975 Recording Number: 2378289 NOTES 1. MONS. VISITED APRIL 24, 1999 & SEPT 12, 2000. 2. THIS FIELD* TRAVERSE SURVEY WAS P ERFORMED WITH A 6—SECOND THEODOLITE AND ELECTRONIC MEASURING UNIT. ACCURACY STANDARD IS WAC 332-130-090. 3. THIS SURVEY BASED ON DATA FROM CITY OF EDMONDS SHORT PLAT #S92-262, REC #9305260729 & SURVEYS IN FLD BK 116, PG 55 & FLD BK 139, PG 117 BY A. CHENOWETH, PLS. 4. SET BENCH MARK: TACK IN LEAD w/ DISC 0 NE CORNER ELEV: 375.65 5. ELEVATION DATA: SEWER MANHOLE #103, IE 369.01 LE(3END MERIDIAN — CITY OF EDMONDS SP #S92-262 0 SET TK IN LEAD w/ DISC (3' R.P.) M SET 2"X2" STAKE & TACK —MON IN CASE B Birch P Apple EXISTING TK IN LEAD C Cherry S Sequoia D Cedar T Hawthorne F Fir A Alder H Hemlock i Japanese Maple L Holly M Maple RECEIVED NOV 13 2003 DEVELOPMENT SERVICES CTR. CITY OF EDMONDS SURVEY FOR: EXACTA SURVEYING SERVICE LAURENCE F. DIXON', PLS Gaston Enterprises 12304 31ST AVENUE NE 20351 Greenwood Ave N SEATTLE, WA 98125 �4'111 L I A 10 Shoreline, WA 98133 JOB 0 (206) 365-0670 #: 99042 EXPIRES DRAWN: DATE- SCALE: HMM Sept. 20, 2000 is$ 30' RECEIVE,) NOV 13 2003 DEVELop"ENT SERVICES CITY OF EDMONDS CTR. N r7 (4 N oo k[' r LL 7(o A VE 14 -o,4-- 00 3 2- 4, 2,70 4Z71 2-3132- E.D* BUILT 0 CITY OF EDMONDS, WATERLINE AS 6 ADDRESS HOMEOWNER CONTRACTOR SCALE DATE DRAWN PERMIT 90 4-2 7 BY NO. 45 A/0 8.9, cv co 'z co [7' z w a: F- 0 cy) zm F- T— Cf) -- 2 .2' F- D .5 (NI T- cf) 22.5' cq w 2 17.5' 0 c\l lz= 04 T— —21 w 0 fz� cv) L z < F-- > Ir w LLJ 17.7'-J U) -7.5* w cr > C z LL 06 cy) z 4.5 04 c/) w 23' 0 5 0. co _-1 Tl- z w m 2.8 0 Lo LL 76th AVE W CITY OF EDMONDS WATERLINE AS- BUILT ADDRESS1 76th AVE W 23124 PERMI NUMBER 2004-0268 HOMEOWNER: CONTRACTOR: SWEAZY DATE INSPECTED: - DRAWN BY: DATE DRAWN: 4/27/05 1. ABILA 4/29/05 AdAle ss 2-3132- 4m U-) 114- 7(, A VE- (IV loe, /'�w I � 9 i Eo 0 CITY OF EDMONDS WATERLINE AS- BUILT ADDRESS HOMEOWNER -74e A vtE- vv CONTRACTOR SCALE v" A DATE RAWN PERMIT y 1890 BE "311,6r-e-L NO. 45 lLfo7�4� 40 C. 1 B913 CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 - FAX (425) 771-0221 Website: wwwdedmondsma.us DEVELOPMENT SERVICES DEPARTMENT Planning - Building - Engineering March 4, 2005 SCL Enterprises, LLC 17921 Linden Ave N Shoreline, WA 98133 SUBJECT: Sweazy Duplex Development — 23124 76 th Ave W Mr. Shawn Leiser, GARY, HAAKENSON MAYOR A pre -con meeting was held on site March 3, 2005 with Jason of KR Constru C�tion and -City of Edmonds Engineering Division inspectors Jaime Hawkins and. myself, Jeanie McConnell. The civil plans approved for this project have some discrepancies which created. several questions during the pre. -con meeting. In ,order to resolve these issues I met with various Public Works,staff as well as Engineering staff that afternoon. The following will be required for the Sweazy Development at 23124 76 th Ave W and a new set of plans shall be submitted to, reflect these changes. STORM The 12" SDR 35 storm line in 76 th Avenue shall be placed so that each of the catch basins fall within the line of the gutter. SEWER • The 8" sewer main in the private road can be laid -at 2% with the elimination of the drop bowl in 76 th Avenue. However, this will create a deep trench and� potentially more difficult pipe installation for a goiod, portion of the sewer and may not be a beneficial change.. • The 6" laterals to the duplex can can be placed in between the buildings instead of to the center of each duplex. The 6" lateral.ca*n branch out to two 4" lines at the point in which it will only serve one unit. i Incorporated August 11, 1890 C.itu - Hp.kinnn lAnAn WATER • Ductile iron pipe will only be required for the 6" line from the existing maia to the new hydrant. • The domestic water line, from the main to the master meter, shall be 2" poly. • The "main water line" through the property shall be 2" poly. • The individual duplex units shall be served by a 1" poly line off of the 2" poly 19main line". • A valve cluster will be required at the connection -to the existing 6" water main in 76 th Ave. This will require: 1 - 2x6 RSGV and 3 - 6x6 RSGV 0 A foot valve will still be required on the hydrant. A map showing the properties effected by the main shut down is attached: as well as a sample shut off ri�tice. You will be required to submit the shut off notice to the City for review prior to posting at each of the effected properties. Shutdowns � are typically allowed Tuesday —Thursday. Dateandtimetobe coordinated with City of Edmonds. Please feel free to contact me with any questions these requirements may pose at 425-771-0220, ext. 1338. A revised civil plan shall be submitted for approval to the City prior to beginning construction of the storm or water systems within the City right-of-way. Thank you, 9144� - WMA-M Jeanie McConnell Engineering Technician Attachments c: Street file Jason, KR Construction RETURN ADDRESS: City of Edmonds, City Clerk 121 5th Avenue North Edmonds, WA 98020 DECLARATION OF RESTRICTIVE COVENANT MULTI -FAMILY RESIDENTIAL Reference #: r-,e- Grantor(s): (1) Zowd 6. 9weggeg (2) Additional on. pg.,— Grantee(s):, Cijy of Edmonds Legal Description (abbreviated): Sec�3 / �Twn_Z? Ea44 r v-- ioly Rng ew,% i" Qt OR Lot _jBlock________Plat Assessor's Tax Parcel ]D#(s): (1) 005-7&70cm lto V (2) Assessor's Tax Parcel E10 not yet assigned VVIUREAS, Obycilc( 16- Sweaze-% are the owners of the following described real estate in tlie City of Edmonds, to wit: Property Address: 2-3jZY 76yt2 4,, ow. ­,# XY0.2 d, Legal Description: We),,Y�X .2 4- ra -f -C ex, 1!9J- le-e- V- e>tl* 4-' 4 r- /6 , -Ske / -10,VJ I1*A e .1Wd,4 le e 11 S_ ddeA 10�26190'rl A Aeg-w�� e,-coe le e eleel e g.�. _1 oel ,d2 C-4-F soe 4 /1 ,*, 'I / 1Z e e- Assessor's Tax Parcel ED # (s): 0 0,5- ;` & 7 QQ CC / 6 0 '/ AUTHORIZED FOR RECORDING City of Edmonds By: —Dat Page of WHEREAS, the above named owners are desirous of imposing a restrictive covenant upon said premises in compliance with Section 19.00.040 of the Edmonds Community Development Code. WITNESSETH, that for and in consideration of the premises, the above named owners do hereby declare and grant to the City of Edmonds as Grantee the following restrictive covenant, to -wit: That at the time of the execution of this Covenant the Grantors have agreed to the Ordinance of the City of Edmonds provide that no building for multiple fanffly housing may be erected on subject property containing more than /0 -units. Said Covenant shall be binding upon all present and future owners of said real estate and t heir heirs, successors and assigns. "�7_ DATED this V - day ofO(/yber,.2a_-�� GRANTOR GRANTOR State of Washington ss County of I certify that I know or have satisfactory evidenc hat C4 Id 67. signed this instrument, on oath stated that'g/she was authorized to execute the - instrument and ack-awl the free and voluntary act of such party for the uses 2nd purpw m6ow I n � % instrument. Subscribed and sworn to before me this hd day o - M___4V 0, 03 n Ile 1. M f r n!1 Notary Public in and for the State of Washi" My commission expires AUTHORIZED FOR RECORDING City of Edmonds By: Dafi�_ Page of L:\TEMP\BUI]LDING\FORMS\RESTRICT �/'? C. 1 B913 CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 - FAX (425) 771-0221 Website: wwwdedmondsma.us DEVELOPMENT SERVICES DEPARTMENT Planning - Building - Engineering March 4, 2005 SCL Enterprises, LLC 17921 Linden Ave N Shoreline, WA 98133 SUBJECT: Sweazy Duplex Development — 23124 76 1h Ave W Mr. Shawn Leiser, GARY HAAKENSON MAYOR A pre -con meeting was held on site March 3, 2005 with Jason of KR Construction and City of Edmonds Engineering Division inspectors Jaime Hawkins and myself, Jeanie McConnell. The civil plans approved for this'project have some discrepancies which created several questions during the pre -con meeting. In order to resolve these issues I met with various Public Works staff as well as Engineering staff that afternoon. The following will be required for the Sweazy Development at 23124 76 th Ave W and a new set of plans shall be submitted to reflect these changes. STORM The 12" SDR 35 storm line in 76 th Avenue shall be placed so thateach of the ,catch basins fall within the line of the gutter. i SEWER The 8" sewer main in the private road can be laid at 2% with the elimination of the drop bowl in 76 th Avenue. However, this will create a deep trench and potentially more difficult pipe installation for a good portion of the sewer and may not be a,beneficial change. The 6" laterals to the duplex can can, be placed in between the buildings instead of to the center of each duplex. The 6" lateral can branch out to two 4" lines at the point in which it will only serve one unit. Incorporated August 11, 1890 .qi--,tp.r (-.itxy - Hp.kinnn JAnAn WATER • Ductile iron pipe will only be required for the 6" line from the existing main to the new hydrant. • The domestic water line, from the main to the master meter, s*hall be 2" poly. • The "main water line" through the property shall be 2" poly. • The individual duplex units shall. be served by a 1 " poly line off of the 2" poly main line". • A valve cluster will be required at the connection to the existing 6" water main in 76 th Ave. This will require: 1 -. 2A RSGV and 3 - 6x6 RSGV • A foot valve will still be required on the hydrant. A map showing the properties effected by the main shut down is attached as well as a sample shut off notice. You will be required to submit the shut o I ff notice to the City for review prior to posting at each of the effected properties. Shut downs are typically allowed Tuesday — Thursday. Date and time to be coordinated with City of Edmonds. Please feel free to contact me with any questions these requirements I may pose at 425-771-0220, ext. 1338. A revised civil plan shall be submitted for approval to the City prior to beginning construction of the storm or water systems within the City right-of-way. I Thank you, 91*L�rw-ww-m Jeanie McConnell Engineering Technician Attachments c: Street file Jason, KR Construction 7725 T/ I'I 7713 (D 23203 YIII 7624 7706 17704 00 7703 7707 ML CL 7622 7626 7629 23310 23220 3 146 z L in Cl) 7618 7621 a 7632-36 23216 31 38 23424 23204 7616 0 LA 7614 7616 7616 14. 23212 7612 7610 Its 7607 23208 23202 .......... YX . ............... 23421; 23405 9 w I 1 9 ts -4 -4 -4 -A -4 -4 In (0 -A 0 -A A -4 N to to -L 77� 0 -A . ...... ... ...... . 01) to 75TH M -A ... .. .. ......... En CD -4 -A 7426 Its u 23422 23404 - ------ 7419 742( N 7420 . ... ....... ra 1 -4 7413 7412 741: *4 -4 7406 xx.; 632-36 6 14 7616 limit 761 2 7610 P7 10 .1 r% . 12Z bow - 7 AUG 13 2003 PERMIT'COUNTER CITY OF EDIWONDS SEPA 111AFFIC IWACT ANALYSIS 1.4ame of proposed "ect: SCL ENTERPRISES Owner/Applicant: Shaun Leiser/ SCL Enterprises, LLC Nam ' 17921 Linden Av N SveeMailft Address Shoreline, WA 98133 city state zip Telephone: 206 229 6038 WORK SHUT Applicant Same Num We' I Stmet/Mailitag A&k= City state zip Telephone: Same Traffic Engineer who prepared the Traffic Impact Analysis: Dean Houqh & Associates Degn M-�nijph 425-335 0262 Contarpt Nam Telephone Firm Nam 1. PROJECT DESCPJWIION a. Stree, address qbwwn): 23124 76th Av W b. Location: On west side of '76th Av W and 115 north of 232nd St SW (See DHA drawing C1/2) (Anwis a vicinity map and skeplan.) c . . Specify exisfing land use: Residential - Single Family d. specify proposed type and size of development: Multiple Resi dential (duplex) constructing 5 dupleses - 10 units on'a lot 801 x 3001 c. When will the project begin cmstruction and when will it be completed? Iqn t-.n Jimp 2nnA f Define proposed access locations: one 20' curb cut on north side of site onto 76th Av W . I for one location only. g. Define proposed sight dis . uurce at site egress locations: Road is 44" wide and at 10 1 from travel . ed way, sight distance is limited by hill crest to left(north) to about 320' and 800' o r g sout 2. TRIP GENERAIION a. Existing Site Trip Gewntion Table: lAnd use I Dv* (ADI) PM Peak -Hour Trips 114 OUT Single family residence N/A 1 0 Code 210 b. Proposed Project Trip Generation Table: Lind Uw Daffy (AD1) PM Pcak-Hour Trips IN OUT Dup�exes Code 210 N/A 5 5 c, Net Now Project Trip Generafion Table: Land Use Daily (ADI) PM Peak -Hour Trips IN OUT Duplexes Code 210 N/A 4 5 d. Staw assumptions and mediodology for internal, link -diverted or pamby trips: n/A - 3. TRIEP DISTREBUTION prepare and attach a graphic showing project trip distribution percentages and anigunlent& N/A 4. WE ACCESS ROADWAY/DRWEWAYS AND SAMTY a. Have sight distance requirements at cpw location been met per. AASHTO rcquirernents? Yes. Street is posted 30mph and there is 3201 left and 800' right sight Fiistance per AASHTO requirements. b.' Intersection Level of Service Analysis: N/A * Existing Conditions LOS Delays a Yea of Opening Delays LOS 9 Five Years Beyond Change of Land Use LOS Delays (intersections to be evaluated shall be deWmined bY the CAY OfEdPnOnds Y'raffic Engineer) c. Describe chmmlizRtiOn warranb: N/A (Adach sft*iA9P1X8-) d. Vehicle StorageQuelling Analysis (CalcuWe 50010 and 93 % queuing lengths): N/A 950/0 • Existing Conditions • Year of Opening • -Five Years Beyond Changeof Land Use e. If appmpriate, state stop SiP and signal warrants: N/A f Suniniarize local accident history: N/A D.- I TRAMCYOLUMES a. Dwaft existing ADT and peak -hour counts, including bulking 1110MCIDOOK on stred adjacent to aDd dirwtly finpacted by the poojeft. N/A b. DwAibe the estimated ADT and Pe&-hO9r-OOuDt56 imbuft turning movemmts, the year the pxqcd 's My open (with and without project traffic). N/A c. Describe the estimated ADT and peak -hour couats, inchiding turning movements, five Years aft the project has been My open (with and without project traffic). N/A . d. State wnual backgratuid traffic growth ho" and source: N/A 6. LEVEL OF SERVICE ANALY,SIS SOMMartm LeM of Savice Anal�yms bdbw. and attach supporbag LOS MUOYMB PWVOC &c following for each afterial.stred or =tcrW idavection mwacted by ten er MMOM peak - hour trip. Odw Cityvianned, =" also, be &c1ored WD &0 LOS C"WiOW- Existiez LOS: Existing Condition: Year of Opening LOS,: With Project Without Project: N/A 0 *. 0 0 Five Years After Opening LOS: N/A With Project: Without Project: Note any assumptiondvanations to standard analysis default values and justifications: 7. MITIGATION RECOMMENDATIONS State recommended measures and fees required to nutigate p . roject specific traffic unpacts- N/A 8. bUpdWM MITIGATION REQUIREMENTS Residential developments &at generate ton PM peak -hour trips or less will be required to pay a $200 per PM peak -hour tHp fee. top& . pM peak-11our Trips -9 X S200 $1R &nd 'oe 17021 I EXPIRES: 4 / 5 / C.A9— I D-- e -16k-� AVf Z4 TH 3,; ZZ ST.0- ASTH :1.§ PL Sw V Sm T--- .. ��PL PL Sle jo Sw X 226TH 21!1. sw si PC 1 2254 4- 5T 227& 227TH ST SW 226FH sw pt Kw- 226TH S1 r -------H -Lj2i�8Ttf L2�IH Sr 6 S T f 22 Sw 6100 228TH 0 AECRFA TION K ST W ST, -SW-7� I T ST �31TH T 230TH ST. S ��6" H ST Sw w PL 230 T S 3. Z-3 TH S T 71ERR4CE SKEK TH 76 0 Sri �AW L �N PAW MAMMAL 11-111D T, 232ND ST S1 CLUO 23 2ND pt . . C:T t.3 2 ST S1 3 -- Sw z a" com "OU SW n W A�7- a-T, UPOZ - 113- PL LL I VGER A, VA 232ND PL SW Fs L 'LC Lr L 233RI) pj Lis I 234TH 2 'S PROJECT -c �w IMPARTS PARK PIUMAL a " ST S 236THIm ; i- ST TO Sk, < SITE r- A RIDE 1,4 FAK�c 35TH �LT 1 "0 T Sw p E T. a] - 6 00 S $ 237Tli T Sw Ism co ISTI 238T 238TH s T33 PAW SW WY EDMUNT 2391H ST 2:17th L 31, ir a 8 i ISIAND.- _�311 :I. k sw lei I- C Ti. ;1 240Tjj Ek P p K ------ NILE 240TIl ST 1�11 �w -- Z39TH Pt Sv , s, 240TH TIH LS T i�lsf '--TEWLE 241ST 41ST':; 242H ST SW V GOLF WURSE ST S C) L Z. p L SW 242ND 241ST sr-.' (St r) 2! DSTS ST SW rEMACE ET r-L .0 -,-.LAKE- BALI � ;.- I IN =43ROST S47 Sw PAW 24.19Q. To Z03 PL 14 203RD ST ND 05 11:7�- rfM4CE I'ST= . mmz_;�� IE (N NE 204TIl 205TH ST AGE, Uj 6 HOL YRM 04 .12; . - . . . . . . . . . 203RD ST N 200 rL Uj 1, -4- I - C4 THOL X I T �N�r- zzo-ji oSS I HE c+ 200TH KE "Ie C �, z rllPe - KC 200TH -..- - .,-. IE ZOIST PL ST LAXE N N 199TH 200 H PAW ST ca p- Cm j7REC 20(0)TH S-- TIT -%- E 2500 CT N 198 ST 197TH PL -4---- E 198TH 77 "`�RUWERS < R 191TH PL= a( I it 196TH ---PL ui ST NE HE 4 HE 1981" sr PK ------ 197T PL- 196TH 195ft PL R-1 < N 194TH 'NE ST 00 19! TH 197TH CT PIZ ST 1100 HE HE 195TH LN 196 S1 95TO FL IE I-L611 ST cj Nf, IAI RIOE ST HE 1941 WRTH Lu CD NE 195TH �E Sr 100 CITY PAR :-<1 _L194TH ST N m a ST "I 901H TO ST HE HE 19;zr St 41 1 .1 WQ " rn S HE -- 191ST ST MRD St - RE N OTH itt V - - . m I - < ST Is, 9 S11 188TH Cf1W 7.!�;-7 2 XIK �.w 4 , _�E 189TH ST ST 190 TH ST 31", ST, 'D HE 'a 09, N NE "0 187 N 187TI K 186TIf ST LLJ E Uj Orr to V 14 r ME 86TH ST kv HE 187TH DO lbou N 185 ST Cc 85TH ST sr ST N 183RD ST 2300— �i A V) 16 Ln 300 RE HE 185 ST L ­0 184 TH ND Ir Sr NE ZFF! 183R -RD-LSr 185TH, 181st M Uj ST .0 W ST en C'i U, F C' -NE PARK A RIDE NE 00 = : 180 ST' V L 4e, \15t Pit f N 179TH ST 00 E 179TMH 4e C) >- < 1� IT PL *h, 4 JA .1 C Air ''r LIU & ASSOCIATES, INC. Geotechnical Engineering - Engineering Geology - Earth Science VICINITY MAP 5-UNIT TOWNHOMES �L3124 - 76TH Avenue West EDMONDS, WASHINGTON JOB NO. 3AO87 .1 DATE 7/14/03 PLATE 1 UNIFIED SOIL CLASSIFICATION SYSTEM MAJOR DIVISIONS GROUP GROUP NAME SYMBOL GRAVEL CLEAN GW WELL -GRADED GRAVEL, FINE TO COARSE GRAVEL COARSE- MORE THAN 50% OF GRAVEL GP POORLY -GRADED GRAVEL GRAVEL WITH GM SILTY GRAVEL GRAINED COARSE FRACTION SOILS RETAINED ON NO. 4 SIEVE FINES GC CLAYEY GRAVEL SAND CLEAN SW WELL -GRADED SAND, FINE TO COARSE SAND SID POORLY -GRADED SAND SAND MORE THAN 50% MORE THAN 50% OF SAND WITH SM SILTY SAND RETAINED ON THE COARSE FRACTION NO. 200 SIEVE PASSING NO. 4 SIEVE FINES SC CLAYEY SAND FINE- SILT AND CLAY INORGANIC ML SILT CL CLAY GRAINED LIQUID LIMIT ORGANIC OL ORGANIC SILT, ORGANIC CLAY SOILS LESS THAN 50% MORE THAN 50% SILTY AND CLAY INORGANIC MH SILT OF HIGH PLASTICITY, ELASTIC SILT CH CLAY OF HIGH PLASTICITY, FAT CLAY PASSING ON THE LIQUID LIMIT FoRGANIC OH ORGANIC SILT, ORGANIC SILT NO. 200 SIEVE 50% OR MORE HIGHLY ORGANIC SOILS PT PEAT AND OTHER HIGHLY ORGANIC SOILS NOTES: SOIL MOISTURE MODIFIERS: 1. FIELD CLASSIFICATION IS BASED ON VISUAL EXAMINATION DRY - ABSENCE OF MOISTURE, DUSTY, DRY TO OF SOIL IN GENERAL ACCORDANCE WITH ASTM D2488-83. THETOUCH 2. SOIL CLASSIFICATION USING LABORATORY TESTS IS BASED SLIGHTLY MOIST - TRACE MOISTURE, NOT DUSTY ON ASTM 02487-83. MOIST - DAMP, BUT NO VISIBLE WATER 3. DESCRIPTIONS OF SOIL DENSITY OR CONSISTENCY ARE VERY MOIST - VERY DAMP, MOISTURE FELT TO THE TOUCH BASED I ON INTERPRETATION OF BLOW -COUNT DATA, VISUAL WET - VISIBLE FREE WATER OR SATURATED, APPEARANCE OF SOILS, AND/OR TEST DATA. USUALLY SOIL IS OBTAINED FROM BELOW WATER TABLE LIU & ASSOCIATES, INC. UNIFIED SOIL CLASSIFICATION SYSTEM Geotechnical Engineering - Engineering Geology - Earth Science PLATE 3 TEST PIT NO. 1 Logged By: JSL Date: 7/1/03 Ground El. Depth USCS Sample w Other ft. CLASS. Soil Description No. % Test OL Black, loose, organic, silty fine SAND, with roots, dry (TOPSOIL) SM Light -brown, loose to medium -dense, gravelly, silty fine SAND, 2 some roots, d Tan -gray, medium -dense, silty fine SAND, trace to some gravel, 3 tr;ce roots, d!y SM Light -gray, very -dense, gravelly, silty fine SAND, occasional cobble, 4 slightly moist to dry (fresh VASHON TILL) 5 6 Test pit terminated,@ 4.5 ft, groundwater not encountered. 7 8 10 TEST PIT NO. 2 Logged By: JSL Date: 7/1/03 Ground E[. Depth USCS Sample W Other ft. CLASS. Soil Description No. % Test OL Brown, loose, slightly organic, silty fine SAND, trace gravel, with abundant roots, dry (FILL) 2 3 Light -brown, medium -dense, silty fine SAND, trace to some gravel, 4 dry Light -brown to light -gray, very -dense, gravelly, silty fine SAND, SM 5 occasional cobble, slightly moist (fresh VASHON TILL) 6 Test pit terminated @ 5.0 ft, groundwater not encountered. 7 8 Test pit terminated @ 7.0 ft, groundwater not encountered. 9 10 LIU & ASSOCIATES, INC. Geotechnical Engineering - Engineering Geology - Earth Science TEST PIT LOGS 5-UNIT TOWNHOME� 23124 - 76TH AVENUE WEST EDMONDS, WASHINGTON JOB NO. 3AO87 DATE 7/14/03 PLATE MMMMMMMMim— TEST PIT NO. 3 Logged By: JSL Date: 7/1/03 Ground El. Depth USCS Sample W Other ft. CLASS. Soil Description No. % Test SM Brown, loose, silty fine SAND, trace gravel, with cobble to boulder size angular rocks and fine roots, dry (FILL) 2 3 Light -brown to brown -gray, medium -dense, silty fine SAND, trace gravel and fine roots, slightly moist to dry 4 Light -gray, very -dense, gravelly, silty fine SAND, occasional cobble. SM 5 slightly moist to dry (fresh VASHON TILL) 6 Test pit,terminated @ 5.0 ft, groundwater not encountered. 7 8 9 10 TEST PIT NO. 4 Logged By.- JSL Date: 7/1/03 Ground El. Depth USCS Sample W Other ft. CLASS. Soil Description No. % Test SM Light -brown, loose, silty fine SAND, trace to some gravel, with 1 fine roots, dry SM 2 Light -brown to light -gray, medium -dense, silty fine SAND, trace to some gravel and occasional cobble, dry 3 SM Light -gray, very -dense, gravelly, silty fine SAND, occasional cobble. 4 slightly moist to dry (fresh VASHON TILL) 5 6 Test pit terminated @ 4.5 ft, groundwater not encountered. 7 8 9 10 LIU & ASSOCIATES, INC. Geotechnical Engineering - Engineering Geology - Earth Science TEST PIT LOGS 5-UNIT TOWNHOMES 23124 - 76TH AVENUE WEST EDMONDS, WASHINGTON JOB NO. - 3AO87 DATE 7/14/23 1 PLATE 5 TEST PIT NO. 5 Logged By: JSL Date: 7/1/03 Ground El. Depth USCS Sample w Other ft. CLASS. Soil Description No. % Test OL Dark -brown, loose, organic, silty fine SAND, with abundant roots, 1 dry (TOPSOIL) Brown to light -brown, loose to medium -dense, silty fine SAND, SM 2 trace gravel, slightly moist to dry 3 4 Brown -gray, dense, slightly silty, fine to medium SAND, trace to SM 5 some gravel, top 12 to 18 inches weakly cemented, slightly moist (VASHON TILL -ADVANCE OUTWASH transition zone) 6 7 8 Test pit terminated @ 6.5 ft, groundwater not encountered. 9 10�. Logged By: TEST PIT NO. Date: Ground El. Depth ft. USCS CLASS. Soil Description Sample No. W % Other Test 1 2 3 4 5 6 7 8 9 LIU & ASSOCIATES, INC. Geotechnical Engineering - Engineering Geology - Earth Science TEST PIT LOGS 5-UNIT TOWNHOMES 23124 - 76TH AVENUE W EST EDMONDS, WASHINGTON JOB NO. 3AO87 I DATE 7/14E3 :1 PLATE 6 N 00'42'13" W (11" 80.00, rn x 0 CDMC >ZZ X00 ul V! 0 > Z 0 0 rn 0 -n 0 �4 -on —0 .0 (Z (n z z z 0 0 00 C — 0 m --4-0 > rn 03 > ;u :E 0 0 z -4 z 4h. (D .0) (A Z 61 00 C c� z m M 0 M'n > m m n > X Z u), rn — K 0 (-4 M -4 'j z m z m ----------- 80.00, BACK OF C.W.--' L4 Ci 76TH Avs w 80.00, -')K N 00*43'06" W m m x (A z LIU & ASSOCIATES,.INC. Geotechnical Engineering Engineering Geology Earth Science - -- --- ---- SITE AND EXPLORATION LOCATION PLAN 5-UNIT TOWNHOMES 3124 - 76TH AVENUE WEST EDMONDS, WASHINGTON JOB NO. 3AO87 I DATE 7/14/03 PLATE GEOTECHNICAL ENGINEERING STUDY. 5-UNIT TOWNHOMES 23124-76 TH AVENUE WEST EDMONDS, WASHINGTON. L&A Job No. 3AO87 Date: July 20, 2003 Prepared for: SCL Enterprises LLC 17921 Linden Avenue North Shoreline, Washington 98133 By: Liu & Associates, Inc. 19213 Kenlake Place NE Kenmore, Washington 98028 LIU & ASSOCIATES, INC. Geotechnical Engineering Engineering Geology Earth Science July 20, 2003 Mr. Shaun Leiser SCL Enterprises LLC 17921 Linden Avenue North �horeline, WA 98133 Dear Mr. Leiser: Subject: Geotechnical Engineering Study 5-Unit Townhomes 23124 — 76 Avenue West Edmonds, Washington L&A Job No. 3AO87 INTRODUCTION We have completed a geotechnical engineering study for the subject townhome project site, located. in Edmonds, Washington. The general location of the project site is shown on Plate I — Vicinity Map. We understand that the proposed project for the site is to develop five to.wnhome buildings. The purpose of this study is to characterize the subsurface conditions of the, site and provide geotechnical recommendations for site grading, erosion abatement, surface and ground water control, foundation design and construction, etc., for the proposed development of the site. Presented in this report are our findings and recommendations. PROACT DESCRIPTION For our use in this study, you provided us with copies of a property boundary survey plan of the site and a preliminary building layout plan of the proposed development. According to these plans, the site is a rectangular tract of land, about 0.56 acre in size. It has a frontage of 80 feet on its east along 76th Avenue West and is about 303 feet deep. The development will include five townhomes of individual, two-story, above -grade, wood -framed buildings in one row at 10 feet 19213 Kenlake Place NE - Kenmore, Washington 98028 Phone (425) 483-9134 - Fax (425) 486-2746 July 20, 2003 5-Unit Townhomes L&A Job No. 3AO87 Page 2 apart, and a long paved driveway along the north side of the site for access to the townhomes. We understand that site grading will generally conform to the existing contour of the site with minimal cut and fill. SCOPE OF SERVICES Our scope of services for this study comprises specifically the following: I Review the geologic and soil conditions at.the site based on a published geologic,map. 2. Explore the site for subsurface conditions with backhoe test pits to a firm bearing soil stratum or to the maximum depth (about 10 feet) capable of by the backhoe used for excavating the test pits, which ever occurs first. 3. Perform necessary geotechnical analyses, and provide geotechnical recommendations for site stabilization, grading, erosion abatement, surface and ground water control, and foundation design and construction, based on the subsurface conditions encountered in the test pits and results of our geotechnical analyses. 4. Prepare a written report to present our findings, conclusions, and recommendations. SITE CONDITIONS SURFACE CONDITIONS The site is bounded by 76th Avenue West on the east, and adjoined by residential developments on the north and south and west. The site is situated on a broad, gentle to moderately -steep, easterly -declining slope. The terrain within the site generally slopes down gently eastward to within a few feet of its east boundary, then drops moderately steeply down to the streef level of 76th Avenue West. LIU & ASSOCIATES, INC. July 20, 2003 5-Unit Townhomes L&A Job No. 3AO87 Page 3 Presently, the eastern half of the site is occupied by a single-family residence. The western half and the perimeter of the eastern half are dotted with scattered mature evergreen and deciduous trees, intermixed with ornamental trees and shrubs. Shallow dips and bumps have been made over the western half of the site to turn it into a dirt bike course and playground. GEOLOGIC SETTING The Geology Map of the Edmonds East and Part of the Edmonds West Quadrangle, Snohomish and King Counties, Washington, by James P. Minard, published in 1983 by U. S. Geological Survey, was referenced for the geologic and soil conditions of the site. According to this publication, the surficial soil units at and in the vicinity of the site are mapped as Vashon Till (QV0. The geology of the Puget Sound Lowland has been modified by the advance and retreat of several glaciers in the past and subsequent deposits and erosion. The latest glacier advanced to the Puget Sound Lowland is referred to as the Vashon Stade of the Fraser Glaciation, which has occurred during the later stages of the Pleistocene Epoch and retreated from the region some 14,500 years ago. The Vashon Till was deposited directly by glacial ice during the most recent glacial pe6od as it advanced over an eroded, irregular surface of older forinations and sediments. It is a very dense mixture of unsorted clay, silt, sand, gravel, and scattered cobbles and boulders, often referred to as "hard pan". The Vashon Till over the top two to four feet is normally weathered to a medium - dense state, and is moderately permeable and compressible. The underlying fresh till is very dense and, is practically impervious to stormwater infiltration. The fresh till has the strength of low-grade concrete and can stand in a steep natural or cut slope for a long period. If remains LIU & ASSOCIATES, INC. July 20, 2003 5-Unit Townhomes L&A Job No. 3AO87 Page 4 undisturbed and well -drained, the fresh till can provide excellent foundation support with little - settlement expected. SUBSURFACE CONDITIONS Subsurface conditions of the site were explored with five test pits spread throughout the site. They were excavated on July 1, 2002, with a tire -mounted backhoe to depths from 4.5 to 6.5 feet. The approximate locations of the test pits are shown on Plate 2 - Site and Exploration Location Plan. The test pits were located with either a tape measure or by visual reference to existing topographic features in the field and on the topographic survey map, and their locations should be considered only accurate to the measuring method used. A geotechnical engineer from our office was present during subsurface exploration, who examined the soil and geologic conditions encountered and completed logs of test pits. Soil samples obtained from each soil unit in the test pits were visually classified in' general accordance with United Soil Classification System, a copy of which is presented on Plate 3. Detailed descriptions of soils encountered during site exploration are presented in test pit logs on Plates 4 through 6. The site is generally mantled by a layer of topsoil of loose, organic, silty fine sand, from about 6 to 12 inches thick, except that fill up to 3.0 feet deep was encountered in Test Pits 2 and 3 in the area surrounding the existing residence. Underlying the topsoil and fill is a layer of light -brown to brown -gray, loose to medium -dense, silty fi ne sand, from 1.0 to 3.0 feet thick. Underlying this soil layer is a brown -gray to light -gray Vashon Till deposits of very -dense, gravelly, silty fine sand with occasional cobble to the depths explored, except in Test Pit 5 located at the west end of the site where the till soils are weakly -cemented and in transition to an Advance Outwash deposit of gray, dense, slightly silty, fine to medium sand with a trace to some gravel. LIU & ASSOCIATES, INC. July 20, 2003 5-Unit Townhomes L&A Job No. 3AO87 Page 5 GROUNDWATER CONDITION Groundwater was not encountered in any of the test pits. The surficial soils overlying the' Vashon Till were dry and dusty, while the underlying Vashon Till and Advance Outwash soils were slightly moist. The fresh till is practically impervious and tends to perch stormwater infiltrating into the surficial, more -permeable soil layers. The near -surface perched groundwater would flow down -gradient along the surface of the underlying fresh till. Perched groundwater may exist during.the wet winter months, and may completely dry up in the dry summer months. The depth to and the amount of perched groundwater may fluctuate seasonally, depending on precipitatio n, surface runoff, ground vegetation cover, site utilization, and other factors. DISCUSSIONS AND RECOMMENDATIONS GENERAL Based on the soil conditions encountered from our subsurface explorations, it is our opinion that the site is suitable for the proposed development from a geotechnical engineering viewpoint. The loose fill, organic topsoil and unsuitable surficial soils in the root zone should be completely stripped within the driveway, building pads of the lots, or within areas where structural fill is to be placed. The underlying fresih till are of very high shear strength and are capable of providing good foundation support to the driveway and buildings to be constructed on the site. The on -site till soils contain a high percentage of fines, and is very sensitive to moisture. It can also be saturated quickly and result in heavy runoff and soil erosion during extended periods of heavy rainstorms. Curtain drains or ditches may be installed, as required, along the upslope boundaries of the site to intercept and drain surface runoff and near -surface perched groundwater flow away from construction areas and to minimize soil erosion during construction. LIU & ASSOCIATES, INC. July 20, 2003 5-Unit Townhomes L&A Job No. 3AO87 Page 6 Conventional footing foundations placed on or into the underlying very -dense fresh till may be used for supporting the buildings to be constructed on the building lots. Structural fill, if required for site grading of the building pads and driveway, should be placed on proof -rolled, unyielding, undisturbed, dense fresh till soils following the stripping of the surficial unsuitable soils. GEOLOGIC HAZARDS Landslide Hazard The dense to very -dense, fresh till and Advance Outwash soils underlying the site at shallow depths are of very high shear strength and have excellent resistance against slope failures. The competent soils underlying the site coupled with the generally gentle terrain within - the site* should make deep-seated landslides unlikely to occur on the site. Erosion Hazard The loose fill, topsoil and the underlying loose to medium -dense silty fine sand layer are of low resistance against erosion, while the underlying till and Advance Outwash soils are of moderately high resistance against erosion. The gentle terrain over the site should significantly reduce the potential of soil erosion. To further mitigate soil erosion, curtain drains may be installed, as required, along the upslope boundaries to - intercept and safely drain away surface runoff and near -surface groundwater flow. The unpaved ground within the site should be vegetated to provide erosion protection. Stormwater over impervious surfaces, such as roofs and driveway, should be captured by underground drain line systems and catch basins, and tightlined to discharge into a suitable stormwater disposal facility. Exposed ground within the site not covered with pavement should be landscaped and re -vegetated. Discharge of concentrated stormwater should not be allow within the site unless properly collected and conveyed to I discharge to a suitable stormwater disposal facility. LIU & ASSOCIATES, INC. July 20, 2003 5-Unit Townhomes L&A Job No. 3AO87 Page 7 Seismic Hazard The Puget Sound region is classified as Seismic Zone 3 by the Uniform Building Code (UBC). The high shear strength of the fresh till and Advance Outwash soils underlying the site at shallow depths combined with the general lack of constant, extensive, continuous, static groundwater table, should make the risk nil for the occurrence of liquefaction or lateral soil spreading on the site. The buildings to be constructed on the building lots, however, should be designed for the seismic forces during strong earthquakes. Based on the soil data obtained from the testipits, the Soil Profile Type at the site underlain by dense to very -dense glacial soils should be classified as S. in accordance with the 1997 UBC code. SITE PREPARATION AND GENERAL GRADING Site preparation should include demolishing the existing building on the site, clearing and grubbing within construction limits. The foundations of the existing building should be thoroughly removed. Loose fill, topsoil and unsuitable surficial soils with excessive roots should be completely stripped within the driveway, building pads, and in areas where structural fill is to be placed. The exposed surface should be compacted to a non -yielding state using a vibratory roller compactor And proof -rolled with a fully loaded dump truck or water truck. - During construction, storm runoff should be intercepted with ditches or curtain drains, as required, and discharged into a nearby inlet of the storm sewer under the street. - The inlet should be covered with non -woven filter fabric to screen out silt in the water. The on -site soils contain a high percentage of fines and are very sensitive to moisture. A layer of clean quarry spalls. placed over excavated areas and areas of frequent traffic may be required to protect the subgrade soils from disturbance by construction traffic. Silt fences should be erected along the downslope boundaries of the site to prevent sediments being transported onto adjoining properties. LIU & ASSOCIATES, INC. July 20, 2003 5-Unit Townhomes L&A Job No. 3AO87 Page 8 EXCAVATION AND FILL SLOPES Under no circumstance should excavation slopes be greater than the limits specified by local, state and federal safety regulations if workers have to perform construction work in excavated areas. Unsupported temporary cuts greater than 4 feet in height should not be steeper than I H: IV in the surficial weaker soils overlying the fresh till soils, and not steeper than may be vertical in the very -dense, fresh till provided that the overall depth of excavation does not exceed 10 feet. Permanent cut banks should not be steeper than 2H: I V in the surficial weaker soils, and not steeper than I- I AH: IV in the underlying, very -dense, fresh till soils. Permanent fill embankments required to support structural or traffic loads should be constructed with compacted structural fill placed over proof -rolled undisturbed, very -dense fresh till after the topsoil, fill and unsuitable surficial soils in the root zone are stripped. The slope of permanent fill' embankment should not be steeper than 2H:IV. Upon completion, the sloping face of permanent fill embankments should be thoroughly compacted to a non -yielding state with a hoe - pack. The above recommended cut and fill slopes are under the assumption that groundwater. seepage will not be encountered during construction. If encountered, the construction should be immediately halted and the slope stability re-evaluated by a geotechnical engineer. The slopes may have to be flattened and other measures taken to stabilize the slopes. Surface runoff should not be allowed to flow uncontrolled over the top of cut or fill slopes. Permanent cut slopes or fill embankments should be vegetated as soon as possible for long-term stability, and should be covered with plastic sheets, as required, to protect them from stormwater until the vegetation is fully estab lished. LIU & ASSOCIATES, INC. July 20, 20.03 5-Unit Townhomes L&A Job No. 3AO87 Page 9 STRUCTURAL FILL Structural fill is the fill placed under roadway pavements, footings, slabs -on -grade, and behind retaining walls where it support loads. Structural fill should consist of clean soils with particles not larger than four inches and should be free of organic and other deleterious substances. Structural fill should have a moisture content within one percent of its optimum moisture content at the time of placement. The optimum moisture content is the water content in the soil that enable the soil to be compacted to the highest dry density for a given compaction effort. The on -site soils contain too much fines and may be used as structural fill only under fair weather condition when its moisture content can be controlled to close to its optimum moisture content. Imported material for structural fill should be clean, free -draining, granular soils containing no more than 5 percent by weight finer than the No. 200 sieve based on the fraction of the material passing No. 4 sieve, and should have individual particles not greater than four inches. Imported structural fill should be stockpiled and covered separately from the on -site soils. Structural fill should be placed in lifts no more than 10 inches thick in loose state, with each lift compacted to a minimum percentage of the maximum dry density determined by ASTM D1557 (Modified Proctor Method) as follows: Application Within building pads of the building lots Roadway/driveway subgrade Retaining wall backfill Utility trench backfill % of Maximum Dly Densi 95% 95% for top 3 feet and 90% below B179 95% for top 4 feet and 90% -below LIU & ASSOCIATES9 INC. July 20, 2003 5-Unit Townhomes L&A Job No. 3AO87 Page 10 ON -SITE INFILTRATION SYSTEMS Advance Outwash soils of gravelly, slightly silty, fine to medium sand was encountered in Test Pit 5 located at the west end of the site. This sandy soil unit are of moderately high permeability, and should be able to support on -site stormwater infiltration systems. The surface of this soil unit is at about 6.0 feet below the existing grade. For disposing stormwater through infiltration trenches, the bottom of the trenches should be excavated at least 2 feet below the surface of the Advance Outwash deposit. The soils at the bottom of vault or trenches should be verified by a geotechnical engineer during trench excavation. If fine-grained silt or clay soils are encountered at the bottom of the trenches, they should be over -excavated, thoroughly removed and replaced with free -draining sand, pea gravel or washed gravel. The perforated PVC pipes through which stormwater is to be dispersed into the ground should be enclosed in washed gravel wrapped in a layer of non -woven filter fabric to minimize silt intrusion into the pipes. Sufficient cleanouts at strategic locations should be provided for periodically cleaning the pipe to prevent clogging. For the design of the infiltration vault or trenches, we recommend an infiltration rate not exceeding .5.0 iph (inches per hour) be -used. This infiltration rate should include a factor of safety of 2.0. Higher design infiltration rate, if desired, should be verified by in -situ infiltration tests. BUILDING FOUNDATIONS Conventional footing foundations.may be used for supporting the buildings to be constructed on the building lots. The footing foundations should be placed on or into the very- dense fresh till soils, or on compacted structural fill based on the fresh till. Water should not be allowed to accumulate in excavated building footprints. Disturbed soils in footing trenches should be completely removed or thoroughly re -compacted prior to pouring concrete for the footings. LIU & ASSOCIATES, INC. I July 20, 2003 5-Unit Townhomes L&A Job No. 3AO87 Page I I If the above recommendations are followed, our recommended design criteria for footing foundations are as follows: Allowable soil bearing pressure for footing foundations, including dead and live loads, should be no greater than 2,500 psf. The footing bearing soils should be verified on -site by a geotechnical engineer after the footing trenches have been excavated and before the footings are poured. The minimum depth to bottom of perimeter footings below adjacent final exteri or grade should be no less than 18 inches. The minimum depth to bottom of the interior footings below top of floor slab should be no less than 12 inches. The widths of footing foundations should be determined based the total loads they support and the above recommended allowable soil bearing pressure. The minimum width, however, should be no less than 16 inches for continuous footings and no less than 24 inches for individual footings. A one-third increase in the above recommended allowable soil bearing pressure may be used when considering short-term, transitory, wind or seismic loads. For footing foundations designed and constructed per recommendations above, we estimate that the maximum total post - construction settlement of the buildings should be 3/8 inch or less and the differential settlement across building width should be 1/4 inch or less. Lateral loads on buildings can be resisted by the friction force between the foundations and the subgrade soils or the passive earth pressure acting on the below -grade portion of the foundations. For the latter, the foundations must be poured "neat" against undisturbed soils or backfilled with a clean, free -draining, compacted structural fill. We recommend that an equivalent fluid density (EFD) of 350 pef (pounds per cubic foot) for the passive earth pressure be used for lateral resistance. The above passive pressure assumes that the backfill is level or inclines upward LIU & ASSOCIATES, INC. July 20, 2003 5-Unit Townhomes L&A Job No. 3AO87 Page 12 behind the foundations for a horizontal distance at least twice the depth of the foundations below final grade. A coefficient of friction of 0.65 between the foundations and the subgrade soils may be used. These are unfactored values, and a p roper factor of safety should be used in calculating the resisting forces against lateral loads on the buildings. 9 SLAB -ON -GRADE FLOORS Slab -on -grade floors, if used, should be placed on firm subgrade prepared as outlined.in the SITE PREPARATION AND GENERAL EARTHWORK and the STRUCTURAL FILL sections of this report. Where moisture control is critical, the slab -on -grade floors should be placed on a capillary break which is in turn placed on the compacted subgrade. The capillary break should consist of a minimum four -inch -thick layer of free -draining gravel or crushed rock containing no more than 5% by weight passing the No. 4 sieve. We recommend that a vapor barrier, such as a 6-mil plastic membrane, be placed over the capillary break to keep moisture from migrating upwards. DRIVEWAY PAVEMENT Perfonnance of roadway pavement is critically related to the conditions of the underlying subgrade. We recommend that the subgrade soils within the roadways be treated and prepared as described in the SITE PREPARATION AND GENERAL EARTHWORK section of this report. Prior to placing base materi a*l, the subgrade soils should be compacted to a non -yielding state with a vibratory roller compactor and proof -rolled with a piece of heavy construction equipment, such as a fully -loaded dump truck. Any areas with excessive weaving or deflection should be over -excavated and re -compacted or replaced with a structural fill or crushed rock placed and compacted in accordance with the recommendations provided in the STRUCTURAL FILL section of this report. LIU & ASSOCIATES, INC. July 20, 2003 5-Unit Townhomes L&A Job No. 3AO87 Page 13 We recommend that a minimum 6-inch-thick, compacted, crushed rock base (CRB), consisting of 5/8-inch-minus crushed rock, be used for the roadways. Such crushed rock base may not be required if the roadways are based on cuts into undisturbed, native, very -dense, fresh till. The crushed rock or subgrade base should be topped with 3-inch asphalt treated base (ATBI) topped by 2-inch-thick Class B asphalt concrete (AC). SITE DRAINAGE Site and Driveway Grading The on -site surficial soils are of moderately low permeability, while the underlying fresh, till soils are practically impervious. They can be saturated quickly and heavy runoff and near -surface i groundwater may be encountered during periods of heavy rain. To minimize potential difficulties for site grading work due to storm runoff during construction, one or more lines of ditches or curtain drains should be used, as required, to intercept storm runoff and near -surface groundwater flow. Water thus collected should be discharged into a nearby storm sewer., Runoff over Impervious Surfaces Storm runoff over impervious surface, such as roofs and driveway, should be collected by underground drain line systems connected to downspouts and by catch basins. Stormwater thus collected should be tightlined to discharge into a suitable stormwater disposal facility. Building Footing Drains A subdrain should be installed around the perimeter footings of each townhome building to minimize accumulation of groundwater under the buildings. The subdrains should consist of a 4- inch-minimum-diameter, perforated, rigid, drain pipe, laid a few inches below the bottom of perimeter footings. The trenches and the drain lines should have a sufficient gradient to -generate flow by gravity. The drain lines should be embedded in washed gravel completely wrapped in LIU & ASSOCIATES, INC. July 20, 2003 5-Unit Townhomes L&A Job No. 3AO87 Page 14 non -woven filter fabric to within about 12 inches of finish grade. The remaining trench may be backfilled with on -site impervious soils. . Water collected by the perimeter footing subdrains should be tightlined, separately from the roof and surface stormwater drain systems, to discharge into a storm sewer or a suitable stormwater disposal facility. LIMITATIONS This report has been prepared for the specific application to this project for the exclusive use by SCL Enterprises LLC, and their associates, representatives, and consultants. We recommend that this report, in its entirety, be included in the project contract documents for the information of the prospective contractors for their estimating and bidding purposes. The conclusions and interpretations in this report, however, should not be construed as a warranty of the subsurface conditions. The scope of this study does not include services related to construction safety precautions and our recommendations are not intended to direct the contractor's methods, techniques , sequences or procedures, except as specifically described in this report for design considerations. Our recommendations and conclusions are based on soil conditions encountered in the test pits, our engineering analyses, and our experience and engineering judgment. The conclusions and recommendations are professional opinions derived in a manner consistent with the level of care and skill ordinarily exercised by other members of the profession currently practicing under similar conditions in this area. No warrafity, expressed or implied, is made. The site subsurface conditions encountered in the test pits. may vary from those actually encountered during construction. The nature and extent of such variations may not become evident until construction starts. If variations appear then, we should be retained to re-evaluate LIU & ASSOCIATES9 INC. July 20, 2003 5-Unit Townhomes L&A Job No. 3AO87 Page 15 the recommendations of this report, and to verify or modify them in writing prior to proceeding with the construction. CLOSURE We are pleased to be of service to you on this project. Please feel free to call us if you have any questions regarding this report or need ftirther consultation. Six plates attached Yours very truly, LIU & ASSOCIATES, INC. 'u J. S. Julian) Liu, Ph.D., P.E. Consulting Geotechnical Engineer LIU & ASSOCIATES, INC. 1�0 Av( W 22707 22703 8113 22703 22709 22710 10 - 22717 22712 LU 22711 22708 > El 8109 8231 - 7928 - < 22711 0 22716 - 22716 22720 .... 22719 - 22716 22727' 1`1 22717 22727 a22 8101 22725 22728 22730 78t9 _"M 4 W top low ate 22807 228W 0 2M7 7 n7O7 Cr b 2271M 22710 k22710 A.727, :�7JM 1 *730 J� A 77 an K-O 79720 Lumber 22815 22815 8130 8 W 8211 M- , TT �—W L.D.S. 1. 2291 M 7808 2 22904 a 22905 M4 22829 Church cc 8207 M 42219"04122903 229D9!22910 CD 22911 = �e I 1 22828 22903 ca r13 4 -b V\ 8212 22912 3: 22911 8021 Mill 2NI- M 22917 Conquest 22921 ji JW 0 Z 22917 Center Bren1wood e2ii 8107 P1 Z Plaza 22925 230TH T SIN 23007. 230=08 23D07 8222 &204 Q I v ;: a � T 2 W . . . 8 . p , ray Sp t23013 23014 23015 .9 8 23005 W 23010 23011 King c!) — 23005 g 23019 23020 > 23021 - 182301 23015 23016 If . 4 - 23M 23021 23M 23010 =17 ;- 0 23M =4 Better 23027 23D28 a: 23029 - I -+ Public Storage LU 23029 23026 23029 --4 V2 — 23o3o 23030 Homesystem 23021 2311011 1 23102 23103 23031 23104 23030 - 23108 C1 23107 231- 23107, 23108 23109 Z 23110 23122 - - 111 12 23116 North Side 23115: 23116 23117 23114 % 23115 Sunset Villa 23111 - 23116 23105 - L3130 23121 j 23122 23123 b 2M) -41 .-, #�- - �b 31 23117 A 23129' 23130 23131 23130 23125 23129 + 23204, 23205 0 00 23205 G- A 2321 23207 23211 2,2N5 232 23221 8015 23215 233r St SW m 23221 23225 23207 M17 23225 2 80117 23225 23231 23306 232 1 23304 233121,12, 80 9 7709 8 23231 7 8021 2331 -C, 0 Ur 23307 2330 23315 23315 ;71 23312 -2a2ND 23304 >1 -- 3: 23311 3:- 19 8025 7711 <: 23309 233.'! LI 21 Alpen 2331 23311 Haus 0 233:9 23316 C', 23329 00 7811 M07 77 1 23325 T S-A 23405� TIHI I 2341 23406 23405 23402 7714 7712 - 23408 23412 23411 23419� 31 - 7710 N LU 23417 - 23418 23414 8123 7708 23421 23425. 8306 23422 < 123422 23431 8121 23428 bo 23423 7706 0 23502 V, 23432 23439 Chdst Lutheras. 7727 -�-7 - Church Park Edmonds 0 791 9 23508 23"0 N 23513 2 Apartment 23515 7925 23514 23446 7725 235M Park & Ride 23525 7929 23520 23450 2351 Z 23526 7515 0ro 236TH ST SIN, :23601 23601 7918 7900 23601 1 W 7710 123602 23601 7604 23603 > 23605 23607 1316 1 5 23604 236M 23614 '23619 Safeway 23620 23621 23605 23620 23632 236M 7924 36-2 2 2 1,01 3: 1, - ---I F' a 1 2 2 23629 ;;i-A W Wy 9 0 I v m ro� Aoop-C-5501 2,31_�?- 7- APMOVIED T 2-0 At dVA6e(,4-iorjs +o av,0,4,--z do,-�Aleuic,,J ScA 410 Ai'gjtfd. L? VOIN uoA A .4OOP-e3S , 'L313c> 4aJre6.s I-L4 7�-t\ A -le —.1moAAs i WA qto zo �J 10 - LiAAtJ Avc N. vreli C,W,4 t- F.,14e-pri-se-f CLe, Ave /u. 1-4 �91'33 ,z o 1. - �o � - & 03Y 204, - -'�-(/4- O-L?y Alm, Zot, L"zf- (,PC,39, -Z 0 & - s-3 3 - 603E APPROVED AS NOTED BY ENEG�l �ERIN&�. Date: .411-5 �Z� V- C*LL fbf- 9"'D aA';re,1zc,,,erh-, 4jti�ec .4;--Ic,- �,J sgt,,)e k9i&4 A it z " s" - Alo P;P- vN4 A A00AE.s,5 - Z312-e I i A I L),5 e- MV / li v V Nlj� ,10 4D A e J-s ; z 7., 2- (. Cinny copy 1. RESUB APR 05 2005 BUILDING DEPARTMENT 4XTY OF EDMONDS 50FArlC9S s a 0; tA NTT 4 4 N IT :j lj�elecs ,4-f 6,74 OIC 5 ide W,4 /*- ov 76+6 Ave W. LJN;� VN;k A .4mvgEss " .23jzv KE 'f I * - V4 It, Oc';Idtl-17 �30 3 z Are c�-u ,*"4.,*,V 0 [-IN 0 CITY COPY -a-S\-L-A j(P,-AvcW M.T SIM BARRIER FREE )ARKING STALL WAC 1107 W Noks e a, 44%;Ft.^c Zcr��= poorcoom mom y"S unwnow S, IL a MW NIS As parlessAw UNTIL Penx"e�ff mpPMr AM on"IMNSO Am INSTALL11D. 0. SAM" OLA91HO SKALL MO P111104ANIMMY LAOILEP PM WM 2406J. TYPICAL PARTY WALL NOTES 1. PRIMP1111 60LIM TWAXOMSDION CIONTROL PM =0 MV.. 1240 AMP PIPt RO=K-�Tlow Man otc"TAI" pwom MAMALVTwg 2. pm"po IS ape" FFWN 9Wm ON op -own om 0. WIM.L AM MAPPIM my" 2* MN. "am IMLATION. TYPICAL MECHANICAL NOTES 1. PILOTS. IMMORS, M^MN* ELDCHTS AW MOT04M CW TWO FWIIN�.111 AM V"TIMM WMATM SMAL6 ft A MK OF IS- ^oVVIS THS SAVA" rLdom 2. FWI"CM 0114"o OTWW" Pon TM rumm,'" AND KhTm HISATM AWROMAKIM by clom 0. *AS PIWZFL^04191��011 T4� App"lloym 4. 11*11o"T PIXTS, OKA" TMONA79 o"Ve GO WLVINs AMP SHALL 0111 ZWPPW MTM MA40AXVPT VAMPIM- 0. OLOY140 OWYM 04AO-L WS MMC%WW TO VITIMPIL KAN LNOTH OF ~ 10 1j:4LL FILL11"Or" FIXT1.1"m KAK PLOPI MATIM AS FOLLOPW SHOMM as 0AL'"m 'Y, NO? AND C4W MATM PIPM LMATW IN 6MOVITIONIM ep^4" 6KALL W IN&LATW To " WIN. . AATM MMATERS om^LL MW TM ROWNWIIIINTS OF MV7 NAVAA AM ORA" me 00 LASOLAD. TYPICAL 8ECURrTY NOTES 1. MNT%^M= POORD. PRI"IM LOCK W VVAV SOLT LATC� V2* KK rARIM4 � V*- PONNTRATION two OTMKM 2. SLAVINO 000" SMALL NAVV PMV GMT* ON VTMR Arpwff�w LOCNA140, MvIcee. III. MINDOM 9144" HAVE INSIVE LATONINIIII, PIMVW 4. SWINT Vn*AWog POOR SK-" ";Z A Yt9frVIR 0060WATION POW, 90 (,4Mj To (-EAXJ Aboys moom 0. ~009 Sop"W" OLAZINII, Pt" 1.11k; ow, 2406, ^NO 004M ONOM ON 997mom ILWATIONS. TYPICAL STRUCTURAL NOTEIS KID. a""co"" Is, so o" 111111,9146 ZONE 9 ONO" 1.0� 25 LOS. WIL 20001W FOR A= VALIMS SIMS 61W.&MIRAL PRAMM", 91, FOR PLYMMO Smm *Hwr 61. FIRE PROTECTION SYSTIFNIS ONIMPUM PM 111,410,13"Al. 1^0111M.SWAMIATE .1 �L--r P" co" Mawr NoJ"- DIX t VPP 41 I'T -10 IT -10 VMT 5A T Z7, IT IT L . ;-T M m UNIT So UNIT SA INIT 2 LIFIT20 4 UNIT IT 113 IA c A . . ..... ....... . L 16,0 r 0 _�A I IP LEAD DESIGN PROFESSIONAL: SHO-Am r"21 LINcem ^VE"im. 6HCWISLJNS. "A "r 206-22R.60" PR 9-0-MLINC, ^A -*M 206-404-60" 41MGMEM 41"My JWTTINO 11"TrLa 206-1140-11000 STRUCTURAL 9,00,16M Isis wo KIROUINW. INA WOODS 42"22'0004 d- GENERAL CONTRA Cloft am^" $URVEYOR;, CrVIL 1�, Q6OW.QW 10210 ommmonam site plan ACWM COX: WLPINS CA= 'W).WN* t"Mow ,M�CAL Wm -27 AI �K L"WoRm Pon cme W.-ow NOTGN OT-Tv 10� "alm FMM11 ACCAD&OILIT" 10 w 40 2 �Tu-mpiln- �!:�!i�=TTM AD 80 03-128 JMM03) nl= OCCUPANCY TYPF- " cm,-w '-=SS -=ELO, =0576100�001001 . WI (OAPASMW LO rCOV WAW-� * LEGAL OPSW PTION: LOT Apw� 7 2020 Sir WIMM c4mTpmhaTWN -,Mv w MmtTw ao mw or scum mw rearcii-TwAr-T I& *KmToNs LAKe �J ft ze M&ANI'mms ^CAM TRACTS. *AMMUNWTD TW MAT T�Wpzopl meavommw IN VoLum 6 or�mowwpmme 21, wacoRps OR DENSITY: =AVAA 242*0 a, N* 2400 or "m MAIND-ew ALONs MAST, 10 RMT. (ft5C4XVW "OA-MD MOC4RPNO 4 201624M) MA,XI~ VV4LjJNo*. .02 SETBACK CALOS: !�",N S., 9.49&= FRONT YARD SETW40L 4w qb6 1415 wow 2A 401 -4 1.01 25 904 1, -4 -Y Tmc� IIA 11 -4 111 461 414 06 IRMWJIPWC� S*TbAeDK . JO-) -74 Iq4D PARKJNM� 4A 004 46, 1461 . On. M W WA 06 ?MI ANP 9) - . A4TVAL MAX. W-M I "a Div. - olo�� 4"'s 400.19 SLP* 2 970 vqo�r' 1111p Sm S.M.'s! B-012 M.'a �a 400jo 06" a DT7D S`& 402.n .404a 407-W OLM 4 S." a"& 8-Si P'* 6-10204SW2 40.00 404.2 4G*-10 06" v f'M f" STS WISJ& 94" 401" 4104a VIAQ,CODE INFOPAIATION I 044" mom PAN eb PTZ So c� MM) 120 ZONE wpny vwmLZr.:FK iwopmAL mw pitmAza KV44W FAM LOrA"04 SETBACKS: "Im.) war w epm SONM lcrrc4.m 6 wrou L14 � Mo 110 LALINDRY 60 . wr" Ono so ISATWMI so N"m ono 00 "I" MOM -AN FRON I MR PW OWN IS IN BATH. 1. SIDE- WOP G7--- --$ff-AR- OTHER HEIGHT V&b DRANIN6 INDEX ^I 51TE M-AN A2 FOAVATWN PLANS AD FIRST M,001t M-ANS A4 SEWHIP FLOOR PLANO AD ROOF MAMINS PLAJ0 o" CL9YATOMO As M�CVATIONS AS V!TAILS AND WTION LI LANCISCAPINS, PLAN OTS114TURAL NOTIM AND PETAILD VVIL PLANO AND MAILS < tf -1 z c-%1 JAN 2 8--2004 "IT" C Ow" rXEMA11T COUNTER LLJ LLJ AJU lk LY 00 rp W_d d8 '10 71 it'' VT 17 V1 oc.,%j i> 0. LUO V),Lu U.J 0 :4. d 1 0, 4; GEOTECHNICAL ENGINEERING STUDY 5-UNIT TOWNHOMES 23124-76 TH AVENUE WEST EDMONDS, WASHINGTON L&A Job No. 3AO87 Date: July 20, 2003 Prepared for: SCL Enterprises LLC 17921 Linden Avenue North Shoreline, Washington 98133 By: Liu & Associates, Inc. 19213 Kenlake Place NE Kenmore, Washington 98028 I I � I � I � I � I LIU & ASSOCIATES, INC'. Geotechnical Engineering Engineering Geology Earth Science July 20, 2003 Mr. Shaun Leiser SCL Enterprises LLC 17921 Linden Avenue North Shoreline, WA 98133 Dear Mr. Leiser: Subject: Geotechnical Engineering Study 5-Unit Townhomes 23124 — 76 Avenue West Edmonds, Washington L&A Job No. 3AO87 INTRODUCTION We have completed a geotechnical engineering study for the subject townhome project site, located in Edmonds, Washington. The general location of the project site is shown on Plate I — Vicinity Map. We understand that the proposed project for the site is to develop five townhome buildings. The purpose of this study is to characterize the subsurface conditions of the site and provide geotechnical recommendations for site grading, erosion abatement, surface and ground water control, foundation design and construction, etc., for the proposed development of the site. Presented in this report are our findings and recommendations. PROJECT DESCRIPTION For our use in this study, you provided us with copies of a property boundary survey plan of the site and a preliminary building layout plan of the proposed development. According to these plans, the site is a rectangular tract of land, about 0.56 acre in size. It has a frontage of 80 feet on its east along 76th Avenue West and is about 303 feet deep. The development will include five Itownhomes of individual, two-story, above -grade, wood -framed buildings in. one row dt 10 feet 19213 Kenlake Place NE - Kenmore, Washington 98028 Phone (425) 483-9134 - Fax (425) 486-2746 I July 20, 2003 5-Unit Townhomes L&A Job No. 3AO87 Page 2 apart, and a long paved driveway along the north side of the site for access to the townhomes. i We understand that site grading will generally conform to the existing contour of the� site with minimal cut and fill. SCOPE OF SERVICES Our scope of services for this study comprises specifically the following: I Review the geologic and soil conditions at the site based on a published geologic map. 2. Explore the site for subsurface conditions with backhoe test pits to a firm bealring soil i stratum or to the maximum depth (about 10 feet) capable of by the backhoe, used for excavating the test pits, which ever occurs first. 3. Perform necessary geotechnical analyses, and provide geotechnical recommend ations for I site stabilization, grading, erosion abatement, surface and ground water control, and foundation design and construction, based on the subsurface conditions encountered in the test pits and results of our geotechnical analyses. 4. Prepare a written report to present our findings, conclusions, and recommendatio I ns. SITE CONDITIONS SURFACE CONDITIONS The site is bounded by 76th Avenue West on the east, and adjoined by residential developments I on the north and south and west. The site is situated on a broad, gentle to moderatelly-steep, easterly -declining slope. The terrain within the site generally slopes down gently eastward to I within a few feet of its east boundary, then drops moderately steeply down to the street level of 76 1h Avenue West. LIU & ASSOCIATES, INC. � I July 20, 2003 5-Unit Townhomes L&A Job No. 3AO87 Page 3 Presently, the eastern half of the site is occupied by a single-family residence. The western half and the perimeter of the eastern half are dotted with scattered mature evergreen and �eciduous trees, intennixed with ornamental trees and shrubs. Shallow dips and bumps have been made over the western half of the site to turn it into a dirt bike course and playground. GEOLOGIC SETTING The Geology Mqp of the Edmonds East and Part of the Edmonds West Quadrangle,-Sh'ohomish and King Counties, Washingto , by James P. Minard, published in 1983 by U. S. Geological Survey, was referenced for the geologic and soil conditions of the site. According to this publication, the surficial soil units at and in the vicinity of the site are mapped as Vdshon Till (Qvt). The geology of the Puget Sound Lowland has been modified by the advance and 'retreat, of several glaciers in the past and subsequent deposits and erosion. The latest glacier advanced to the Puget Sound Lowland is referred to as the Vashon Stade of the Fraser Glaciation, which has occurred during the later stages of the Pleistocene Epoch and retreated from the reg ion some 14,500 years ago. The Vashon Till was deposited directly by glacial ice during the most recent glacial period as it advanced over an eroded, irregular surface of older formations and sediments. It is a very dense mixture of unsorted clay, silt, sand, gravel, and scattered cobbles and boulders, often referred to as "hard pan". The Vashon Till over the top two to four feet is normally weathered to a: medium - dense state, and is moderately permeable and compressible. The underlying fresh till is very dense and is practically impervious to stormwater infiltration. The fresh till has the strength of low-grade concrete and can stand in a steep natural or cut slope for a long period. If remains LIU & ASSOCIATES, INC. July 20, 2003 5-Unit Townhomes L&A Job No. 3AO87 Page 4 undisturbed and well -drained, the fresh till can provide excellent foundation support with,little settlement expected. SUBSURFACE CONDITIONS Subsurface conditions of the site were explored with five test pits spread throughout the site. They were excavated on July 1, 2002, with a tire -mounted backhoe to depths from 4.5 to 6.5 feet. The approximate locations of the test pits are shown on Plate 2 - Site and Exploratioq Location Plan. The test pits were located with either a tape measure or by visual reference to existing topographic features in the field and on the topographic survey map, and their locations 'should be considered only accurate to the measuring method used. A geotechnical engineer from our office was present during subsurface explorat ion, who examined the soil and geologic conditions encountered and completed logs of test pits. Soil samples obtained from each soil unit in the test pits were visually classified in general accordance with United Soil Classification System, a copy of which is presented on Plate 3. Detailed descriptions of soils encountered during site exploration are presented in test pit logs on Plates 4 through 6. The site is generally mantled by a layer of topsoil of loose, organic, silty fine sand, from about 6 to 12 inches thick, except that fill up to 3.0 feet deep was encountered in Test Pits 2 and, 3 in the area surrounding the existing residence. Underlying the topsoil and fill is a layer of light -brown to brown -gray, loose to medium -dense, silty fine sand, from 1.0 to 3.0 feet thick. Underlying this soil layer is a brown -gray to light -gray Vashon Till deposits of very -dense, gravelly, �silty fine sand with occasional cobble to the depths explored, except in Test Pit 5 located at the west end of the site where the till soils are weakly -cemented and in transition to an Advance Uutwash deposit of gray, dense, slightly silty, fine to medium sand with a trace to some gravel. LIU & ASSOCIATES, INC. July 20, 2003 5-Unit Townhomes L&A Job No. 3AO87 Page 5 GROUNDWATER CONDITION Groundwater- was not encountered in any of the test pits. The surficial soils oveilying the Vashon Till were dry and dusty, while the underlying Vashon Till and Advance Outwash soils were slightly moist. The fresh till is practically impervious and tends to perch st : ormwater infiltrating into the surficial, more -permeable soil layers. The near -surface perched groundwater would flow down -gradient along the surface of the underlying fresh till. Perched groundwater I may exist during the wet winter months, and may completely dry up in the dry summer months. The depth to and the amount of perched groundwater may fluctuate seasonally, depending on precipitation, surface runoff, ground vegetation cover, site utilization, and other factors. DISCUSSIONS AND RECOMMENDATIONS GENERAL Based on the soil conditions encountered from our subsurface explorations, it is our opinion that the site is suitable for the proposed development from a geotechnical engineering viewpoint. The i loose fill, organic topsoil and unsuitable surficial soils in the root zone should be completely stripped within the driveway, building pads of the lots, or within areas where structural fill is to be placed. The underlying fresh till are of very high shear strength and are capable of providing good foundation support to the driveway and buildings to be constructed on the site. The on -site till soils contain a high percentage of fines, and is very sensitive to moisture. It can also be saturated quickly and result in heavy runoff and soil erosion during extended periods of heavy rainstorms. Curtain drains or ditches may be installed, as required, along the upslope boundaries of the site to intercept and drain surface runoff and near -surface perched groundwater flow away from construction areas and to minimize soil erosion during construction. LIU & ASSOCIATES, INC. July 20, 2003 5-Unit Townhomes L&A Job No. 3AO87 Page 6 Conventional footing foundations placed on or into the underlying very -dense fresh till may be used for supporting the buildings to be constructed on the building lots. Structural fill, if required for site grading of the building pads and driveway, should be placed on proof -rolled, unyielding, undisturbed, dense fresh till soils following the stripping of the surficial unsuitable soils. GEOLOGIC HAZARDS Landslide Hazard The dense to very -dense, fresh till and Advance Outwash soils underlying the site at shallow depths are of very high shear strength and have excellent resistance against slope failures. The competent soils underlying the site coupled with the generally gen'tle terrain within the site should make deep-seated landslides unlikely to occur on the site. Erosion Hazard The loose fill, topsoil and the underlying loose to medium -dense silty fine sand layer are of low resistance against erosion, while the underlying till and Advance Outwash soils are of moderately high resistance against erosion. The gentle terrain over the site should signifi cantly reduce the potential of soil erosion. To further mitigate soil erosion, curtain drains may be ins,talled, as required, along the upslope boundaries to intercept and safely drain away surface runoff and near -surface groundwater flow. The unpaved ground within the site should be vegetated to provide erosion protection. Stormwater over impervious surfaces, such as roofs and driveway, should be captured by underground drain line systems and catch basins, and tightlined to discharge into a suitable stormwater dis posal facility. Exposed ground within the ! site not covered with pavement should be landscaped and re -vegetated. Discharge of concentrated stormwater should not be allow within the site unless properly collected and conveyed to discharge to a suitable stormwater disposal facility. LIU & ASSOCIATES, INC.- July 20, 2003 5-Unit Townhomes L&A Job No..3AO87 Page 7 Seismic Hazard The Puget Sound region is classified as Seismic Zone 3 by the Uniform Building Code (UBC). The high shear strength of the fresh till and Advance Outwash soils underlying the site at shallow depths combined with the general lack of constant, extensive, continuous, static groundwater table, should make the risk nil for the occurrence of liquefaction or lateral soil spreading on the site. The buildings to be constructed on the building lots, however, should be designed for the seismic forces during strong earthquakes. Based on the soil data obtained from the test pits, the Soil Profile Type at the site underlain by dense to very -dense glacial soils should be classified as Sc, in accordance with the 1997 UBC code. SITE PREPARATION AND GENERAL GRADING Site preparation should include demolishing the existing building on the site, clearing and grubbing within construction limits. The foundations of the existing building should be thoroughly removed. Loose fill, topsoil and unsuitable surficial soils with excessive roots should be completely stripped within the driveway, building pads, and in areas where structural fill is to be placed. The exposed surface should be compacted to a non -yielding state using a vibratory roller compactor and proof -rolled with a fully loaded dump truck or water truck., During construction, storm runoff should be intercepted with ditches or curtain drains, as required, and discharged into a nearby inlet of the storm sewer under the street. The inlet should be covered with non -woven filter fabric to screen out silt in the water. The on -site soils contain a high percentage of fines and are very sensitive to moisture. A layer of clean quarry spalls placed over excavated areas and areas of frequent traffic may be required to protect the subgrade soils from disturbance by construction traffic. Silt fences should be erected along the downslope boundaries of the site to prevent sediments being transported onto adjoining properties. LIU & ASSOCIATES, INC. July 20, 2003 5-Unit Townhomes L&A Job No. 3AO87 Page 8 EXCAVATION AND FILL SLOPES Under no circumstance should excavation. slopes be greater than the limits specified; by local, I state and federal safety regulations if workers have to perform construction work in excavated areas. Unsupported temporary cuts greater than 4 feet in height should not be ste I eper than I IH:IV in the surficial weaker soils overlying the fresh till soils, and not steeper than may be I vertical in the very -dense, fresh till provided that the overall depth of excavation does not exceed 10 feet. Permanent cut banks should not be steeper than 2H: IV in the surficial weaker soils, and not steeper than I- I/4H: IV in the underlying, very -dense, fresh till soils. Permanent fill embankments required to support structural or traffic loads should be constructed with compacted structural fill placed over proof -rolled undisturbed, very -dense fresh till after the topsoil, fill and unsuitable surficial soils in the root zone are stripped. The slope of permanent fill embankment should not be steeper than 2H:IV. Upon completion, the sloping face of permanent fill embankments should be thoroughly compacted to a non -yielding state with a hoe - pack. The above recommended cut and fill slopes are under the assumption that groundwater seepage will not be encountered during construction. If encountered, the construction should be immediately halted and the slope stability re-evaluated by a geotechnical engineer. The slopes i may have to be flattened and other measures taken to stabilize the slopes. Surface run6ff should not be allowed to flow uncontrolled over the top of cut or fill slopes. Permanent cut slopes or fill embankments should be vegetated as soon as possible for long-term stability, and should be covered with plastic sheets, as required., to protect them from stormwater until the vegetation is fully established. LIU & ASSOCIATES, INC. July 20, 2003 5-Unit Townhomes L&A Job No. 3AO87 Page 9 STRUCTURAL FILL Structural fill is the fill placed under roadway pavements, footings, slabs -on -grade, and behind retaining walls where it support loads. Structural fill should consist of clean soils with particles not larger than four inches and should be free of organic and other deleterious substances. Structural fill should have a moisture content within one percent of its optimum moisture content at the time of placement. The optimum moisture content is the water content in the soil that enable the soil to be compacted to the highest dry density for a given compaction effort. The on -site soils contain too much fines and may be used as structural fill only under fair weather condition when its moisture content can be controlled to close to its optimum moisture' content. Imported material for structural fill should be clean, free -draining, granular soils containing no more than 5 percent by weight finer than the No. 200 sieve based on the fraction of the material passing No. 4 sieve, and should have individual particles not greater than four inches. Imported structural fill should be stockpiled and covered separately from the on -site soils. Structural fill should be placed in lifts no more than 10 inches thick in loose state, with each lift compacted to a minimum percentage of the maximum dry density determined by ASTM D 1557 (Modified Proctor Method) as follows: Application Within building pads of the building lots Roadway/driveway subgrade Retaining wall backfill Utility trench backfill % of Maximum Dry Densi 95% 95% for top 3 feet and 90% below 90% 95% for top 4 feet and 90% below LIU & ASSOCIATES, INC. I July 20, 2003 5-Unit Townhomes L&A Job No. 3AO87 Page 10 ON -SITE INFILTRATION SYSTEMS Advance Outwash soils of gravelly, slightly silty, fine to medium sand was encountered in Test Pit 5 located at the west end of the site. This sandy soil unit are of moderately high per M�eability, and should be able to support on -site stormwater infiltration systems. The surface of this soil unit is at about 6.0 feet below the existing grade. For disposing stormwater through infiltration trenches, the bottom of the trenches should be excavated at least 2 feet below the surface of the Advance Outwash deposit. The soils at the bottom of vault or trenches should be verified by a geotechnical engineer during trench excavation. If fine-grained silt or clay soils are encountered at the bottom of the trenches, they should be over -excavated, thoroughly removed and replaced with free -draining sand, pea gravel or washed gravel. The perforated PVC pipes through which stormwater is to be dispersed into the ground should be enclosed in washed gravel wrapped in a layer of non -woven filte� fabric to minimize silt intrusion into the pipes. Sufficient cleanouts at strategic locations s i hould be provided for periodically cleaning the pipe to prevent clogging. For the design of the infiltration vault or trenches, we recommend an infiltration rate not exceeding 5.0 iph (inches per hour) be used. This infiltration rate should include a factor of safety of 2.0. Higher design infiltration rate, if desired, should be verified by in -situ infiltration tests. BUILDING FOUNDATIONS Conventional footing foundations may be used for supporting the buildings to be constructed on the building lots. The footing foundations should be placed on or into the very -dense, fresh till soils, or on compacted structural fill based on the fresh till. Water should not be allowed to. i accumulate in excavated building footprints. Disturbed soils in footing trenches should be completely removed or thoroughly re -compacted prior to pouring concrete for the footings. LIU & ASSOCIATES, INC. I July 20, 2003 5-Unit Townhomes L&A Job No. 3AO87 Page I I If the above recommendations are followed, our recommended design criteria f6r footing foundations are as follows: 0 Allowable soil bearing pressure for footing foundations, including dead and I I ive loads, should be no greater than 2,500 psf. The footing bearing soils should be verifi I ed on -site by a geotechnical engineer after the footing trenches have been excavated and before the footings are poured. * The minimum depth to bottom of perimeter footings below adjacent final exte I rior grade should be no less than 18 inches. The minimum depth to bottom of the inte'rio I r footings below top of floor slab should be no less than 12 inches. The widths of footing foundations should be determined based the total loads they support and the above recommended allowable soil bearing pressure. The i,minimum width, however, should be no less than 16 inches for continuous footings and no less than 24 inches for individual footings. A one-third increase in the above recommended allowable soil bearing pressure may be used when considering short-term, transitory, wind or seismic loads. For footing foundations designed and constructed per recommendations above, we estimate that the maximum total post - I construction settlement of the buildings should be 3/8 inch or less and the differential settlement across building width should be 1/4 inch or less. Lateral loads on buildings can be resisted by the friction force between the foundatioi is and the I subgrade soils or the passive earth pressure acting on the below -grade portion of the foundations. I For the latter, the foundations must be poured "neat" against undisturbed soils or backfilled with a clean, free -draining, compacted structural fill. We recommend that an equivalent fluid density (EFD) of 350 pcf (pounds per cubic foot) for the passive earth pressure be used for lateral resistance. The above passive pressure assumes that the backfill is level or inclines upward I I I LIU & ASSOCIATES, INC. July 20, 2003 5-Unit Townhomes L&A Job No. 3AO87 Page 12 behind the foundations for a horizontal distance at least twice the depth of the foundations below final grade. A coefficient of friction of 0.65 between the foundations and the subgrade ! soils may be used. These are unfactored values, and a proper factor of safety should be used in calculating the resisting forces against lateral loads on the buildings. SLAB -ON -GRADE FLOORS Slab -on -grade floors, if used, should be placed on firm subgrade prepared as outlined ia the SITE PREPARATION AND GENERAL EARTHWORK and the STRUCTURAL FILL sections of this report. Where moisture control is critical, the slab -on -grade floors should be placed on a i capillary break which is in turn placed on the compacted subgrade. The capillary break should consist of a minimum four -inch -thick layer of free -draining gravel or crushed rock containing no more than 5% by weight passing the No. 4 sieve. We recommend that a vapor barrier, �such as a 6-mil plastic membrane, be placed over the capillary break to keep moisture from migrating upwards. DRIVEWAY PAVEMENT Performance of roadway pavement is critically related to the conditions of the underlying subgrade. We recommend that the subgrade soils within the roadways be treated and pr i epared as described in the SITE PREPARATION AND GENERAL EARTHWORK section of this report. Prior to placing base material, the subgrade soils should be compacted to a non -yielding state with a vibratory roller compactor and proof -rolled with a piece of heavy construction equipment, such as a fully -loaded dump truck. Any areas with excessive weaving or deflection should be over -excavated and re -compacted or replaced with a structural fill or crushed rock pl I aced and compacted in accordance with the recommendations provided in the STRUCTURAL FILL section of this report. LIU & ASSOCIATES, INC. July 20, 2003. 5-Unit Townhomes L&A Job No. 3AO87 Page 13 We recommend that a minimum 6-inch-thick, compacted, crushed rock base (CRB), consisting I of 5/8-inch-minus crushed rock, be used for the roadways. Such crushed rock base m! ay not be required if the roadways are based on cuts into undisturbed, native, very -dense, fresh'till. The crushed rock or subgrade base should be topped with 3-inch asphalt treated base (AT13) topped by 2-inch-thick Class B asphalt concrete (AC). SITE DRAINAGE Site and Driveway Grading The on -site surficial soils are of moderately low permeability, while the underlying fresh till soils are practically impervious. They can be saturated quickly and heavy runoff and nedr-surtace groundwater may be encountered during periods of heavy rain. To minimize potential difficulties for site grading work due to storm runoff during construction, one or more lines of ditches or curtain drains should be used, as required, to intercept storm runoff and nedr-surface groundwater flow. Water thus collected should be discharged into a nearby storm sewer. Runoff over Impervious Surfaces -) Storm runoff over impervious surface, such as roofs and driveway, should be collected by underground drain line systems connected to downspouts and by catch basins. Stormwater thus collected should be tightlined to discharge into a suitable stormwater disposal facility. Building Footing Drains A subdrain should be installed around the perimeter footings of each townhome building to minimize accumulation of groundwater under the buildings. The subdrains should consist ot a 4- inch-minimurn-diameter, perforated, rigid, drain pipe, laid a few inches below the bottom of perimeter footings. The trenches and the drain lines should have a sufficient gradient to generate flow by gravity. The drain lines should be embedded in washed gravel completely wrapped in LIU & ASSOCIATES, INC. I July 20, 2003 5-Unit Townhomes L&A Job No. 3AO87 Page 14 non -woven filter fabric to within about 12 inches of finish grade. The remaining trench may be I backfilled with on -site impervious soils. Water collected by the perimeter footing subdrains ischarge should be tightlined, separately from the roof and surface stormwater drain systems, to d into a storm sewer or a suitable stormwater disposal facility. 111 Mulky.111-113MI This report has been prepared for the specific application to this project for the exclusi.�e use by SCL Enterprises LLC, and their associates, representatives, and consultants. We recommend that I this report, in its entirety, be included in the project contract documents for the information of the prospective contractors for their estimating and bidding purposes. The conclusions and interpretations in this report, however, should not be construed as a warranty of the subsurface conditions. The scope of this study does not include services related to construction safety precautions and our recommendations are not intended to direct the contractor's ;methods, techniques, sequences or procedures, except as specifically described in this report for design considerations. Our recommendations and conclusions are based on soil conditions encountered in thc, test pits, our engineering analyses, and our experience and engineering judgment. The conclus�ions and recommendations are professional opinions derived in a manner consistent with the level of care and skill ordinarily exercised by other members of the profession currently practicing under similar conditions in this area. No warranty, expressed or implied, is made. The site subsurface conditions encountered in the test pits may vary from those actually encountered during construction. The nature and extent of such variations may not become evident until construction starts. If variations appear then, we should be retained to re-evaluate LIU & ASSOCIATES, INC. July 20, 2003 5-Unit Townhomes L&A Job No. 3AO87 Page 15 the recommendations of this report, and to verify or modify them in writing prior to proceeding with the construction. CLOSURE I We are pleased to be of service to you on this project. Please feel free to call us if you have any questions regarding this report or need further consultation. Six plates attached 2 9 rWING 7/17/ Z-0-0-7- Yours very truly, Ll SSOCIATES, INC. J. S. (Julian) Liu, Ph.D., P.E. i Consulting Geotechnical Engineer LIU & ASSOCIATES, INC. f5PFROIJ Wk I W ell I PL P' Sw Sw 7.7_�4j Sw 2257H Z fi, ti i, � Kii -2 ri- 22 A TH g"F Sm L ___ 227,4 W_ 25TP 2 In 226TH I P-sw PL -1� 5T�'PL 226TH S1 x FL 227TH ST Sw 2i8TH �27M Kw ST -,,, :,. __ 228TH 7700 3C ST r - ::-. i'_ , j PARK 229TH . N 1; PL 230r Sw 3w _. .61oo 228TH m I < IF . ;-T k -ST Sw F Till 7TERR4CE si.� ;4�-) -SW-7 220TH St I Z' j. �wi- g-1 t 30TH S 2qqiH T I -,- - Z: TH ST - 23 T14 ST - §�EEK TH Z Sw - - - PARK 01" )IS w ,a FAA kd 232ND ST CLUB - _�W 232NO PL SW m _ 17; - CD 232 9-1-S, a, 2 __ 0 0 �Ipe W U /,. rw C __r I Ll GEW'�;`_. 23M 31 L 232NO Pt 13�'q T IL 233RD Pt L'of 23 S ST 1sw PROJECI PARK WMAL Sw d' W L 236Tj ST Ln .-SITE L, A RIDE -1,4 PAW�Lc 35TH CD ST--Tw' 236TH # f - * (SW (SN .. .. -1 ��J; - F 6 N �00 -2:RTH W S ISTIAN Ze _:_i_1 Y;!5 23W�� 17 238TH Twirl 23711 CREST ST3 3 PAR� :2 AL R EDHOUN 239TH ST -.3c sw 237fif-VE 238TH .44 24kjjj EL Sw CIA 4ILE w 24 — _L3qT" X 239TH'- Pt Lo ST SW ­4 ?STU ST iK -. f4TS T S TEWLE 241ST 240 �j TH ST W 41ST 241ST STQ� 24211E SW I ii6mi 7�42HD sw GOLF' COURSE CD Iwo Z42RD ST PL SW r 242ND Co ST Sw Co TERRACE ST SW j rL - �tj 43W ST SW �743 R 1) ST S�_ j J� �143. LAKE. ___BAL IN la , A - To L I , 3M. swm=!,- AGE PL 0 203F; S NO HOL 4- 4 4 AT L, .-. 'Id, � z 205TH NE 2o4TY s r N 9 c 903RD ST Fm T t�j 5 - 200 PL W 1 CATHOLICI:*'�,! 201ST ST .`V 1 m .. . -4 �C , RE Cr 1E 201SI PL K < q W 200TH"' -ST J , E00 LUC N N 199 200TH ST PAW jA Cof 200TH S pt 199L 500 rh C1 2 N 197TH 98 ST L J97TH PL 196TH .7 r, ' � V '-NE 198TH r, 1p ST 19 BRUGGERS MbPK 5� 4 HE 198!1!.s� 1971 P ME jE1 - IE 195 St 196TH N 195D PL ST 9 1971" CT 1_�, LJ S� HE �,kvj I H CD 9 E 195TH LN ST .7 N 194TH ME 12�T ST AIORTH p Uj x 19 1H PL '1951H PL NE 195TH 0 HE 194THSr W� rq CITY.1 zm 0 ME I ST 2 .9 �13M f - ST ST N 190TH N 190TH r, _E 1! -, � W_ " 2 U rm (ST 'V% 19iST ST E, m ST 189 ST N, bl. C" 7'? m,�: CTR ZC'� 190 HE 189TH HE 19DTH ST -1 ­ -1 . HIE Uj 0 ST TH M HE 16TT-M Alt . 'm I ?E T_ up, N yll — - M 187n 18 7 ST 186TM w 19 AV Uo_ a; INU bb ST H ST . LU N z 85TH 14 ME 86TH S A 4.� ST ST V ME 185TH ST 100 HE 184TH 187TH ST A;f., A FEEL-. w ST N 183RD ST' It - PL R Uwj AaNEr F ) T ME RE q.: MD' L ME I TH S HE I QMo N 103RD S jE ST ME 183RD Sr E 185TH, N' NE N I als ST 24 U,j PARK -m-R—ST RIDE 00 % 180 9 W ST w L FS CT p X CP 0:'N 179TH ST 00 ME 179 *1- NE :3C 3.. PL .4 LI_U & ASSOCIATES, INC. Geotechnical Engineering - Engineering Geology - Earth Science VICINITY MAP 5-UNIT TOWNHOMES 3124 - 76TH Avenue West EDMONDS, WASHINOTON JOB NO. 3AO87 I DATE 7/14/03 PLATE 1 = = m m m m = = m m = m = m = m m m m N 00'42'13" W (10" 80.00' ;u 0 -n m 1: 0 o L� 0 'o CD m C C C >ZZ z z z x0o 0 0 00 C.- 0 M --I -u x > m CU ul 0 -n 0 > Z 0 0 rn 0 0 n > 0 0 _9 rn Z n m z Ln OD (o IQ 0 K; 0 (A 0) (n z 0 C C c� --I T T z 01 m m 0 M -T1 --q > -1 m n>X Z (n M N 9: (A rTI —A '4 z m z rG, m M BACK OF C.W. 76-TH AV a w )K 80.00' N 00*43'06" W m x z LIU & ASSOC] ATES,.I.NC. Geotechnical Engineering Engineering Geology Earth Science SITE AND EXPLORATION LOCATION PLAN 5-UNIT TOWNHOMES 3124 - 76TH AVENUE WEST EDMONDS, WASHINGTON JOB NO. 3AO87 I DATE 7/14/03 PLATE UNIFIED SOIL CLASSIFICATION SYSTEM MAJOR DIVISIONS GROUP GROUP NAME SYMBOL GRAVEL CLEAN GW WELL -GRADED GRAVEL, FINE TO COARSE GRAVEL COARSE- MORE THAN 50% OF GRAVEL GP POORLY -GRADED GRAVEL GRAVEL WITH GM SILTY GRAVEL GRAINED COARSE FRACTION SOILS RETAINED ON NO. 4 SIEVE FINES GC CLAYEY GRAVEL SAND CLEAN sw WELL -GRADED SAND, FINE TO COARSE SAND SID POORLY -GRADED SAND MORE THAN 50% MORE THAN 50% OF SAND SAND WITH SM SILTY SAND RETAINED ON THE COARSE FRACTION NO. 200 SIEVE PASSING NO. 4 SIEVE FINES SC CLAYEY SAND FINE- SILT AND CLAY INORGANIC ML SILT CL CLAY GRAINED LIQUID LIMIT ORGANIC OL ORGANIC SILT, ORGANIC CL�Y SOILS LESS THAN 50% MORE THAN 50% SILTY AND CLAY INORGANIC MH SILT OF HIGH PLASTICITY, EL ! ASTIC SILT CH CLAY OF HIGH PLASTICITY, FAT CLAY PASSING ON THE LIQUID LIMIT ORGANIC OH ORGANIC SILT, ORGANIC SILT NO. 200 SIEVE 50% OR MORE HIGHLY ORGANIC SOILS PT _FPEATANDOTHER HIGHLY ORGANIC SOILS NOTES: SOIL MOISTURE MODIFIERS: 1. FIELD CLASSIFICATION IS BASED ON VISUAL EXAMINATION DRY - ABSENCE OF MOISTURE, DUSTY, DRYTO OF SOIL IN GENERAL ACCORDANCE WITH ASTM D2488-83. THETOUCH 2. SOIL CLASSIFICATION USING LABORATORY TESTS IS BASED SLIGHTLY MOIST - TRACE MOISTURE, NOT DUSTY ON ASTM D2487-83. MOIST - DAMP, BUT NO VISIBLE WATER 3. DESCRIPTIONS OF SOIL DENSITY OR CONSISTENCY ARE VERY MOIST - VERY DAMP, MOISTURE FELT TO THE TOUCH BASED ON INTERPRETATION OF BLOW -COUNT DATA, VISUAL WET - VISIBLE FREE WATER OR SATURATED, APPEARANCE OF SOILS, AND/OR TEST DATA. USUALLY SOIL IS OBTAINED FROM BELOW WATER TABLE LIU & ASSOCIATES, INC. UNIFIED SOIL CLASSIFICAT I ION SYSTEM Geotechnical Engineering - Engineering Geology Earth Science PLATE 3 TEST PIT NO. 1 Logged By: JSL Date: 7/1/03 AI T 0=1 0 N111 Depth LISCS Sample w Other ft. CLASS. Soil Description No. % Test OL Black, loose, organic, silty fine SAND, with roots, dry (TOPSOIL) SM Light -brown, loose to medium -dense, gravelly, silty fine SAND, 2 some r dy Tan -gray, medium -dense, silty fine SAND, trace to some gravel, 3 trace roots, d!y SM Light -gray, very -dense, gravelly, silty fine SAND, occasional cobble, 4 slightly moist to dry (fresh VASHON TILL) 5 6 Test pit terminated @ 4.5 ft, groundwater not encountered. 7 8 9 TEST PIT NO. 2 Logged By: JSL Date: 7/11/03 Ground El. Depth LISCS Sample W Other ft. CLASS. Soil Description No. % Test OL Brown, loose,- slightly organic, silty fine SAND, trace gravel, with abundant roots, dry (FILL) 2 3 SM Light -brown, medium -dense, silty fine SAND, trace to some gravel, 4 dry Light -brown to light -gray, very -dense, gravelly, silty fine SAND, SM 5 occasional cobble, slightly moist (fresh VASHON TILL) 6 Test pit terminated @ 5.0 ft, groundwater not encountered. 7 8 Test pit terminated @ 7.0 ft, groundwater not encountered. 9 10 LIU & ASSOCIATES, INC. Geotechnical Engineering - Engineering Geology - Earth Science TEST PIT LOGS 5-UNIT TOWNHOMES 1 23124 - 76TH AVENUE WEST EDMONDS, WASHINGTON JOB NO. 3AO87 DATE 7/14/63 1 PLATE 4 M TEST PIT NO. 3 Logged By: JSL Date: 7/1/03 Ground El. Depth USCS Sample W. Other ft. CLASS. Soil Description No. % Test SM Brown, loose, silty fine SAND, trace gravel, with cobble to boulder size angular rocks and fine roots, dry (FILL) 2 3 Light -brown to brown -gray, medium -dense, silty fine SAND, trace gravel and fine roots, slightly moist to dry 4 —Light-gray, very -dense, gravelly, silty fine SAND, occasional cobble. —§-M-- 5 slightly moist to dry (fresh VASHON TILL) 6 Test pit terminated @ 5.0 ft, groundwater not encountered. 7 8 9 .10 Logged By: JSL TEST PIT NO. Date: 7/1/03 2 Ground; El. Depth USCS Sample W Other ft. CLASS. Soil Description No. % Test SM Light -brown, loose, silty fine SAND, trace to some gravel, with 1 fine roots, dry SM 2 Light -brown to light -gray, medium -dense, silty fine SAND, trace to some gravel and occasional cobble, dry 3 SM Light -gray, very -dense, gravelly, silty fine SAND, occasional cobble. 4 slightly moist to dry (fresh VASHON TILL) 5 6 Test pit terminated @ 4.5 ft, groundwater not encountered. 7 8 9 .10 LIU & ASSOCIATES, INC. Geotechnical Engineering - Engineering Geology - Earth Science TEST. PIT LOGS 5-UNIT TOWNHOMES 23124 - 76TH AVENUEWEST EDMONDS, WASHINGTON JOB NO. 3AO87 I DATE 7/14/b3 I PLATE 5 TEST PIT NO. 5 Logged By: JSL Date: 7/1/03 GroundEl. Depth USCS Sample w Other ft. CLASS. Soil Description No. % Test OL Dark -brown, loose, organic, silty fine SAND, with abundant roots, dry (TOPSOIL) Brown to light -brown, Iooie_t6_medium-dense, s�ty —fine SAND, SM 2 trace gravel, slightly moist to dry 3 4. Brown-gray,'�ense, slightly silty, fine to midium SAND, trace to SM 5 some gravel, top 12 to 18 inches weakly cemented, slightly moist (VASHON TILL -ADVANCE OUTWASH transition zone) 6 7 8 Test pit terminated @ 6.5 ft, groundwater not encountered. 9 10 TEST PIT NO. Logged By: Date: Ground Depth ft. USCS CLASS. Soil Description Sample No. w % Other Test 2 3 4 5 6 7 8 9 10� LIU & ASSOCIATES, INC. Geotechnical Engineering - Engineering Geology - Earth Science TEST PIT LOGS! 5-UNIT TOWNHOMLS 1 23124 - 76TH AVENUE WEST EDMONDS, WASHIN6TON JOB NO. 3AO87 I DATE 7/14/0 1 PLATE 6