Loading...
23231 HIGHWAY 99 (2).PDF1111111111 lill 14054 23231 HWY 99 ADDRESS: I TAX ACCOUNT/PARCEL NUMBER: 5'7&7 00a 018'00 BUILDING PERMIT (NEW STRUCTURE): COVENANTS (RECORDED) FOR: CRITICAL AREAS: DETERMINATION: E] Conditional Waiver E] Study Required 6raiver DISCRETIONARY PERMIT #'S: DRAINAGE PLAN DA PARKING AGREEMENTS DATED: EASEMENT(S) RECORDED FOR: PERMITS (OTHER): PLANNING DATA CHECKLIST DATED: SCALED PLOT PLAN DATED: SEWER LID FEE $: LID #: SHORT PLAT FILE: LOT: BLOCK: SIDE SEWER AS BUILT DATED: SIDE SEWER PERMIT(S) #: SOILS REPORT DATED: STREET USE / ENCROACHMENT PERNUT FOR: WATER METER TAP CARD DATED: OTHER: .(eca-01-07 16L W,44 Uhll4hr- ?CcAmemll-olne LATEMPOSTsTomiAStreet File Checklist.doc 560-018 US Postal Service Receipt for Certified Mail No Insurance Coverage Provided. uo not use tor Internabonal Mail (See reverse) Sent to -Ad&-1 A�V/7 Street & Number z 171,41Y P Off)ee, State, & ZIP e Postage $ Certified Fee Special Delivery Fee Restricted Delivery Fee c) Return Receipt Showing to Whom & Date Delivered Return Receipt gvwing to Whom, < Date, & Addressw's Address 0 0 TOTAL Postage & Fees $ Postmark or Date E LL Cn �1� j EL ca 77, LL' 06 Z 10 -0 Cn 11 7 N .0 ca C - (D . . 0 3-: C-4 .70 0" 4 0. C'4 -0 I C� 0 bfc:) E r- Lu. 'W Cn Cn Cf) W F-' F- 0 Lu z E CA FILE NO. CA— 0V C&ical Areas Checklist -------------------------------------------------------------- Site Information (soils/topography/hydrology/vegetation) I. Site Address/.Location: 2. 3. 4. Property Tax Account Number: MS-* &1,9 ppo 'I Y 4 aqs:�- ld;v Approximate Site Size (acres or square feet): Is this site currently developed? yes; _ no. "V— '17: 'e.) If yes; how is site developed? ---------- 5. Describe the general site topography. Check all that apply. Flat: less than 5-feet elevation change over entire'site. Rolling: slopes on site generally less than 15% (a vertical rise of I 0-feet over a horizontal distance of 66-feet). Hilly: slopes present on site of more than 15% and less than 30% a vertical rise of 10-feet over a horizontal distance of 33 to 66-feet). Steep: grades of greater than 3 0% present on site (a vertical rise of I 0-feet over a horizontal distance of less than 33-feet). Other (please describe): 6.. Site contains areas of year-round standing water: A/ —0/-, ; Approx. Depth: 7. Site contains areas of seasonal standing water: Approx. Depth:, What season(s) of the year? 4 hf- 8. Site is in the floodway floodplain—.dZ_ of a w ater course. 9. Site contains a creek or an area where water flows across the grounds surface? Flows are year- round? J1 &4 Flows are seasonal? (What time of year? 10. Site is primarily: foreged Meadow shrubs —&ZL; mixed urban landscaped (lawn,shrubs 4tc) 11. Obvious wetland is present on site: 'PiA 21- 0 M. ----------- P11064--n- ne A�. ��� SxLZ' FF_ _- ............ V 411AW! MAW �"J "X"I"M .... ...... ...... a hggpm 'g MI TO W& P:' C. p. �g a. W V MM I . _4 ft fq: qp%7.1-0. M 0 ft-dLdK AW 1QWW 1] City of Edmonds Development Services Department Planning Division Phone: 425.77I.OnO Fax: 425.771.0221 Critical Areas Filek ' Critical Areas Checklist Fee: $45.00 Date Received by Dev. Serv. Dept: City Receipt No:, 1(2faC19 Date Mailed to Applicant: CRITICAL AREAS CHECKLIST The Critical Areas Checklist contained on this form is to be filled out by any person preparing a Development Pern-dt Application for the City of Edmonds Prior to his/her submittal of a development pern-dt to the City. The purpose of the Checklist is to enable City staff to determine whether any potential Critical Areas are, or may be, present on the subject property. The information needed to complete the Checklist should be easily available from observations of the site or data available at City Hall (Critical areas inventories, maps, or soil surveys). An applicant, or his/her representative, must fill out the checklist, sign and date ie,**�vbmit it to the City. The City will review �e ake a precursory site visit, and make' doerni;natk�n of the subsequent steps necessary t pleie i��elopxnent permit application. Please submit a vicinity map, along with the signed copy of this form to ' assist City staff in finding and locating the specific piece of property described on this form. In addition, the applicant shall include other pertinent infortnafion (e.g., site plan, topography map, etc.) or studies in conjunction with this Checklist to assist staff in completing their preliminary assessment of the site. I have completed the attached Critical Areas Checklist and attest that the.answers provided are factual, to the best of my knowledge (fill out the appropriate column below). Owner/Applicant: Name Street Address City State Zip Telephone Signature Date 1 6 Name W/ 42. Street Address city state zip - aLSI-�'rY2, Telephone ,-2 Date d:rwepUor*nn1CACLHar#daLd00 ReOted 41102000 -8 1 R I g �I ti 0 0 a �I 41'1.di.l�:I, PM11 23729 23119 23D3I 2928 7e Z V 41 7M 2i226 23138. MI M5. 7qff 23202 2 3420 3m- Oslo 000 Rid 74 74. CD !412 j:' V, Xq ZF T�A 7z ON it CA (jE NO. CA-0�0 —A Citical Areas Checklist -------------------------------------------------------------- Site Inform Ation (soils/topography/hydrol.ogy/Vegetation) 1. Site Address/.Location: Property Tax Account Number: 00S-* ?,9 2. vo a,94 7�* 1919S4_ /,fly a1919 iyll 3. Approximate Site Size (acres or square feet): 4. Is this site currently developed? -,,V--.Yes; no. If yes; how is site developed? 5. Describe the general site topography. Check all that apply. Flat: less than 5-feet elevation change over entire'site. Rolling: slopes on site generally less than IS% (a vertical rise of 0-feet over a horizontal distance of 66-feet). Hilly: slopes present on site of more than 15% and less than 30% a vertical rise of I 0-feet over a horizontal distance of 33 to 66-feet). Steep: grades of greater than 3 0% present on site (a vertical rise of I 0-feet over a horizontal distance of less than 33-feet). Other (please describe): 6. Site contains areas of year-round standing water: Approx. Depth: 7. . Site contains areas of seasonal standing water: ;Approx. Depth: What 3.eason(s) of the year? 'd Ik 8. Site is in the'floodway J4 floodplain__Jle of a water course. 9. Site contains a creek or an area where water flows across the grounds surface? Flows are year- round? &4 - — Flows are seasonal? (What time of year? J0 10. Site is primarily: forested _ 0.//V : me shrubs ellV mixed urban landscaped (lawn,shrubs itc) IV 11. Obvious wetland is present on site: W1 X . �,t�4 0. ME -X :.4 . ... 3% . . �; t . . . . . . . . ...... Wig' va _ ONM -i"Al .. .. . ..... .. .. . ... ...... .. F V---- WIN', "M 'j.i A "M&N.-A.- 'T.4 4 414, AM. A4 P V I $y. ktt & VM MCA= ".. , A. -I: : W'% .-: . '. , � 1 1 . : $ : 4 W MY m 01 AN �y M; MV, MS Mu. J. .71 Z-51,W; A%.dLdW AW I Critical Areas File #: City of Edmonds critir-aiAreasChecklist Fee: $45.00 Development Services Department Date Received by Dev. Sery. Dept: 1� a4 I on Planning Division City Receipt No:- / (0 k7 99 1 1 Phone: 425.77 I.= Date Mailed to Applicant: Fax: 425.771.Onl CR' ITICAL AREAS CHECKLIST The Critical Areas Checklist contained on this form is to be filled out by any person preparing a Development Permit Application for the City of Edmonds Prior to his/her submittal of a development permit to the City. The purpose of the Checklist is to enable City staff to determine whether any potential CriticalAreas are, or may be, present on the subject property. The information needed to complete the Checklist should be easily available from observations of the site or data available at City Hall (Critical areas inventories, maps, or soil surveys). An applicant, or histher representative, must fill out the checklist, sign and date ie, And. pv�rnit it to the City. The City will review he-6he'-C'k'HW--- �piake a precursory site visit� and mak# � e *na�ii�� of the 9-1 . .' subsequent steps necessary t elopment, permit application. Please submit a vicinity map, along with the signed copy of this form to assist City staff in finding and locating the specific piece of property described on this form. In addition, the applicant shall include other pertinent information (e.g., site plan, topography map, etc.) or studies in conjunction with this Checklist to assist staff in completing their preliminary assessment of the site. I have completed the attached Critical Areas Checklist and attest that theanswers provided are factual, to the best of my knowledge (fill out the appropriate column below). Owner/Applicant: Name Street Address City state zip Telephone Signature Date resentative: Name /p/ 7 Street Address city State zip ;Teleohone p Pat Date d.rweptIonqan&'CACLHnndoutA= Revi"d W1 02M 12� . -1 .7; Date: 21 March, 2002 To: Duane Bowman, Development Services Director Via: Dave Gebert, City Engineerdo -312-Z- From: Lyle Chrisman, Engineering Program Manager4o,�,//- I Subject: Claim from Pacific Park Apart s at 23231 Highway 99 The building manager of the subject apartment complex submitted plans May 1, 2001, to install carports at the subject site. Part of their package included a site plan that included the carport locations. The original site plan was unreadable and we asked the applicant to resubmit a site plan and to be sure they showed all the utilities. During the review process Public Works advised us they had a public water and sewer main that ran through the site and they did not want the contractor to construct the carports over those utilities. We noted on the drawings, " posts shall not be placed over any utilities". May 25, 2001 the permit was issued. On June 4, 2001, Public Works received a call to locate utilities at the subgect site. Jim Waite of Public Works called the contractor and told him not to construct the carports because the City has utilities in the area and he had not seen the drawings. The contractor stated he had not seen the drawings either. Construction started some time after the June 4, 2001. On June 8, 2001 revised footing plans were submitted to the Building Department for a smaller spread footing. One of the posts was positioned right over the water main and the contractor could not achieve the proper depth. Since the Building Department was unaware of Engineering's requirement not to construct over the utilities, they approved the smaller footing. At no time was the contractor given a variance to construct the carports over the watermain. The contractor proceeded to construct the new footing. On June 11, 2001 Public Works and Engineering were advised the carports had been constructed. A field inspection was conducted and based on that inspection, it was determined that the contractor bad contructed carports over the public utilities at 3 different sites. City of Edmonds June 14, 2001; A stop work was issued by the Building Department. The contractor was advised to remove the carports that were built within the utility easement and over the utilities. The City Engineering Division talked to the Apartment Manager and the contractor numerous times over the phone and informed both of them why the carports had to be relocated. We pointed out to them the drawings indicated they were not to construct over the utilities. The contractor indicated they were given approval by the Building Department because they received approval of the smaller spread footer. I explained to both parties, the Building Department only approved the design and not the installation location with regard to utilities. July 25, 2001; Engineering staff and Public Works Sewer Department met with the contractor and the apartment manager on site to discuss the problem and what could be done to resolve the issue. We told the manager and contractor again the carports could not be located within the utility easement because the Public Works crews would not be able to repair/replace any of the line without damaging the carport. We restated the issue about the note on the drawing not to construct over the utilities. During our meeting I noticed that some of the electrical work had been completed since the stop work order had been issued on the specific carports. September 21, 2001; City staff met the with contractor and apartment manager to discuss the options to resolve the issue. The options were: 1. Relocate carport 2. Transfer ownership of the utilities: Installation of commerical double detector check assemblies would be required to protect the public main. Potential cost $20,000. 3. Relocate utilities away from the carports. 4. Excute written agreement that the apartments would pay for any relocation or damage to carport if the City had to work on the utilities. We advised the representatives that option 4 was not really an option to us. They stated they would get back to us on their decision. Apartment Manager decided to relocate the carports and submitted drawings that indicated the relocation of those carports in question. The resubmittal was approved. Hefterskpadfio-park dalm.doc MEMORANDUM Date: 21 March, 2002 To: Duane Bowman, Development Services Director Via: Dave Gebert, City Engineero-3/2-2- From: Lyle Chrisman, Engineering Program Manage Subject: Claim from Pacific Park Apartments at 23231 Highway 99 The building manager of the subject apartment complex submitted plans May 1, 200 1, to install carports at the subject site. Part of their package included a site plan that included the carport locations. The original site plan was unreadable and we asked the applicant to resubmit a site plan and to be sure they showed all the utilities. During the review process Public Works advised us they had a public water and sewer main that ran through the site and they did not want the contractor to construct the carports over those utilities. We noted on the drawings, " posts shall not be placed over any utilities". May 25, 2001 the permit was issued. On June 4, 2001, Public Works received a call to locate utilities at the subject site. Jim Waite of Public Works called the contractor and told him not to construct the carports because the City has utilities in the area and he had not seen the drawings. The contractor stated he had not seen the drawings either. Construction started some time after the June 4, 2001. On June 8, 2001 revised footing plans were submitted to the Building Department for a smaller spread footing. One of the posts was positioned right over the water main and the contractor could not achieve the proper depth. Since the Building Department was unaware of Engineering's requirement not to construct over the utilities, they approved the smaller footing. At no time was the contractor given a variance to construct the carports over the watermain. The contractor proceeded to construct the new footing. On June 11, 2001 Public Works and Engineering were advised the carports had been constructed. A field inspection was conducted and based on that inspection, it was determined that the contractor had contructed carports over the public utilities at 3 different sites. City of Edmonds June 14, 2001; A stop work was issued by the Building Department. The contractor was advised to remove the carports that were built within the utility easement and over the utilities. The City Engineering Division talked to the Apartment Manager and the contractor numerous times over the phone and informed both of them why the carports had to be relocated. We pointed out to them the drawings indicated they were not to construct over the utilities. The contractor indicated they were given approval by the Building Department because they received approval of the smaller spread footer. I explained to both parties, the Building Department only approved the design and not the installation location with regard to utilities. July 25, 2001; Engineering staff and Public Works Sewer Department met with the contractor and the apartment manager on site to discuss the -problem and what could be done to resolve the issue. We told the manager and contractor again the carports could not be located within the utility easement because the Public Works crews would not be able to repair/replace any of the line without damaging the carport. We restated the issue about the note on the drawing not to construct over the utilities. During our meeting I noticed that some of the electrical work bad been completed since the stop work order had been issued on the specific carports. September 21, 2001; City staff met the with contractor and apartment manager to discuss the options to resolve the issue. The options were: I . Relocate carport 2. Transfer ownership of the utilities: Installation of commerical double detector check assemblies would be required to protect the public main. Potential cost $20,000. 3. Relocate utilities away from the carports. 4. Excute written agreement that the apartments would pay for any relocation or damage to carport if the City had to work on the utilities. We advised the representatives that option 4 was not really an option to us. They stated they would get back to us on their decision. Apartment Manager decided to relocate the carports and submitted drawings that indicated the relocation of those carports in question. The resubmittal was approved. Hetters1pacific-park daindoc 1, -s i , 5� 7 E PINNACLE An American Management Services Company July 16, 2003 SENT VIA FACSIMILE AND OVERNIGHT DELIVERY (425) 672-5750 Mr. David K. Gebert, P.E. City Engineer City of Edmonds 121 5h Avenue North Edmonds, WA 98020 Pinnacle Pier 70 2801 Alaskan Way, Suite 200 Seattle, Washington 98121 Phone 206-215-9700, 'Fax 206-215-9777 W Q_ RECEIVED JUL I ? 2003 ,-NGINEERING DIVISION Re: Pacific Park Apartments at 23231 Highway 99 ("Apartment") Tax Parcel No. 0057-670-000-1806 Dear Mr. Gebert: This letter will confirm the terms of our settlement agreement regarding the current dispute with the City of Edmonds, the Pacific Park Apartments and Pinnacle Realty Management Company ("Pinnacle"). The Apartment, its ownership group and Pinnacle agree to execute a full release of all claims they may have against the City as of this date in exchange for a mutual release of all current claims the City may have against the Apartment, its ownership and Pinnacle. According to your letter of July l't and your voice mail message to me today, upon the receipt of this letter today, the City will halt all collections actions against the property and the parties will work towards entering a final settlement document within the next several days. Please contact me or have a representative from the City Attorney's Office contact me directly so we may draft the final documents. If you prefer, I can send to you a simple Mutual Release for your review. I may be reached at (206) 215-9874 or we can exchange e-mail versions of the final documents if that will facilitate the process. My e- mail address is dkrull@prmc.com. 0 Thank you for your assistance. Sincerely, David J. Krull General Counsel Pinnacle Realty Management Company. Cc: Craig Dwyer 0 0 40 C. 1 SWO CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771 -0m - FAX (425) 771-0221 Website: wwd.edmondsma.us DEVELOPMENT SERVICES DEPARTMENT Planning - Building 9 Engineering June 20, 2003 Craig Dwyer Pacific Park Apartments, LLC 2707 Colby Avenue, Suite 1201 Everett, WA 98201 RE: Civil Fines Dear Mr. Dwyer: GARY HAAKENSON MAYOR I was contacted by a Mr. Jonathan McQuade, of Pinnacle Realty, on June 13, 2003 regarding the civil fines accumulated to date regarding the carports that were constructed at 23231 Highway 99, Edmonds. I offered a proposed settlement agreement to resolve the outstanding fines by, -Which both parties walk away from any claims against each other. Mr. McQuade said he would relay the offer and subsequently called me back on June 18, 2003 and said my offer was rejected and suggested two other alternatives which were completely unacceptable to the City. Therefore the City of Edmonds intends to turn this matter over for collection on June 27, 2003. A copy of the original Notice of Violation is enclosed. Please note that since you failed to appeal the notice of violation, there is no litigation recourse available to you. Further, once the matter is turned over to collections, the amount due is collected at a rate of 150% of fines owed pursuant to RCW 19.16.500. I strongly suggest that my offer to resolve -this matter be reconsidered. I will be leaving on an extended vacation starting June 25, 2003. Dave Gebert, City Engineer has been designated to handle this matter in my absence. Sinceri ly, Duane V. Bowman Development Services Director CC: Scott Snyder, City Attorney Mark Bucklin J. Robert Smith Jeannine Graf, Building Official David Gebert, City Engineer '-', C. 18 913 CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 - FAX (425) 771-0221 Website: www.d.edmondsma.us DEVELOPMENT SERVICES DEPARTMENT Planning - Building - Engineering June 4, 2003 Mr. J. Robert Smith Stanislaw Ashbaugh, LLP 701 Fifth Avenue Seattle, Washington 98104-7012 RE: Pacific Park Apartments @ 23231 Highway 99 Dear Mr. Smith: GARY HAAKENSON MAYOR In reply to your letter dated May 30, 2003, please refer to copies of the enclosed Notice(s) of Civil Violation(s) issued on June 12, 2002 for the carport violations at the subject property. The corrective action on the Notice required that final project 4pproval be granted which as you know, occurred on April 23, 2003 (the day the carports were removed). Thus, pursuant to the Notices, fines were assessed at $100.00 for each carport for 298 days (298 days x $100 fine per day x 3 carports = $89,400.00). In response to the reference of Mr. Gebert's letters, I note that none of the letters rescind, suspend or stay the penalties imposed by the Notices of June 12, 2002. The City desires to meet with Mr. Dwyer and his representatives in this matter to reach an equitable agreement and resolution. Please contact my office to schedule for a mutually agreeable day and time to meet and discuss this matter. /I Sinct2r'ely, Duane V. Bowman Director Development Services 0 [nrnrnnrntPr4 Aiinii-zt 7 1 iRgn * STRNISLRW H�;H8HUUH jVax:2U6,�44r4uu riay Vr 0 iD-Do 7D RECEIVE-1 BUILDING DEPT. STANISLAW -ASHBAUGH, LLP mmil Yaddre" 1. Robert Sm Ith r0bS@iftisIsw-a9hb3VtftCM A7TORNEY May 30 2003 VIA FACSEWLE AND FIRST- CLASS MAIL -Ms. Jewinin c.L. Graf city of Edmonds 121 . 5th Avenue North Edmonds, WA 98020 Re: Pacific Park Apartments 23231 Highway 99 Edmondr-7 Washineon: Dear Ms. Graf-. This law firm represents Pacific: Park Apartnentsi LLC. We are in receipt of your-,lefter. 'dated May 12, 2003, to Mr. Craig Dwyer. Apparently, there is either confusion on the pall.of the City of Edmondsq or the City is attempting to unlawfully harass and extort money from Pacific Park. First, neither Mr. Dwyer or Pacific Park are.aware that civil penalties in the amount of $89,400 have accumulated against Pacific Park Apartments for enforcement action taken on the carport issue. Rather, the information pTovided to W Dwyer and Pacific Park by the City expressly stated that removal of the carports needed to occur before April 5, 2003, not July 12,. .2002 as your letter suggests. For example, in a letter from David Gebert dated January 6, 2003 to Pacific P&k Apartments (attached hereto), it was the City's position that no fines had yet accrued. Specifically, Mr. Gebert stated: uilding Division, you renewed two building According to the R permits in May, 2002, fdr. the purpose of relocating the three c nstiuctetl over City utibty easements. Based carports that were o 4400 BANK OF AMERICA TOWER ..,"I FIFTH AVENUE - SEArrLE WA 98104-7012 T 40111S, 70W www'slanislaw -ashbaugh.com 9 STRNISLRW HbHbHUbH aX: 2Ut,�4!4 (4uu I'Idg DWID i-).00 Ms..Jeanninc L. Graf Nitty 30, 2003 Page 2 on a current site visit, the three carports have not yet been removed. �q:.. P Ms letter is to inform-yoU Ihat if the three carports arc not removed from the City's utiUty easement by February 15, 2003, a Notice toCoff, ectwill be Wued and if required, a Notice of Violation to follow.. We do notwi0h to go to such lengths; however, this situation ca�nat. wn�nue. Please take appropriate action to rcmove the three:carpo m by February 15, 2003. en The letter said nothing about accumulated fines that you now in tion. In fact, this letter indicates just the opposite; that the carpotU niust be removed byFebruary 15,2003 or, a N666i: -my to yom, letter, the City admits that a No&x -of VioMoii-hais Violation will follow. Thus, conti n not even been issued and would not be in'Ued until sometime after February 15, 2003. Remarkably, you were even copied on fts letter. Apparently, an Order to Correct Violation was issued on February 19, 2003. Ho the dcadlinc for completion of the correotivt� action was extended.to April 5, 2003. This W4 AS. confumed in a letter. from Mr. Gebert to Craig Dwyer, dated March 5, 2003 (attached h Mr. Gebert's letter stated: Based upon the fact that on.March 4, 2003 you applied for your demolition permit to r=ovc the carports and provided written assurance (your e-mail to Marie Harrison on March 4, 2003) that you will complete the removal of the carports by April 5, 2003, the deadline for completion of the..corrective action required by the, Order to Correct Violation issuea on February 19, 2003 is hereby extended to 5:00 PM April 5, 2003. Agzin, there was no reference to accimulatod fines since July 1 Z, 2002. Instoad, tho only reference to a violation was the Order to:'Coffect Violation issued in February 2003. And the deadline for correction was not until Apfil S. 2003. Notably, you were also copied on thia letter. Consequently, we fail to understand your. position that fines'havc been accruing since July 2002.. It seems to us that your letter is nofl�ing-but a retaliation letter sent in response to my letter to Dave Geberrt on April 8, 2003 oWining our position that the City is liable -for the wgt-of- removing and relocation the carports. I W it hard to believe that the City would sit on actniin 9 fines for neulv a v6ar without savini? a word to the ncrson le;!edlv owine that much money. especially in light of the letters from Mr. Gebert. I am sure a jury will likewise be skeptical of - the City's position, and in fact will likely be angered by the City's conduct in this matter..:. STRNISLRW HSHbHUI,:)H 0 aX:2Ub,�44(4UU ridy 3U 0 0 ij.j,:) r. Q44 Ms. Jeannine L. Graf May 30, 2003 Page 3 'Finally, if it remains the City's intention to refer these alleged fines to collection, we will be left with no alternative but to take all necessary steps to vigorously defend agaiinst such acd66..: Please let me know the City's intention on this issue. Very truly yours, stknislaw Ashbaugh, uY J. rt Smith JRS:lr Endlosures C: Craig Dwycr Mark R. BuOdin X-.\CLIENT%57726\6656\LTR GRAFOIDOC STRNISLRW RSHHHUbH *aX:2Ub,544(4UU riay )v 0") 1 D - D'j r. V-) :1 Ali C'. 1 %4 1 Jmiary 6, 2003 CITY OF EDMONDS 121 STH AVENUE NORTH -EDMONDS. WAN= - (425)771-0220 -FAX (42S)77i-02.21 Wabsite; www.d.edmoondsma,us DEVELOPMENT SERVItES DEPARTMENT PlannIng - BuIlding - Enolneedng gusan-14arritt Pacific Park Apartments, LLC 23231 Highway 99 Eftonds, WA 98026 RE: Relocation of Carvorts — P2ciric ParkAvartments at 23231 Hiebwav 99 Dear Ms. Harri'tt, GARY HAAkIEV-0'. According to the Building Division, yca renew�d.two building penuits in May, 2002,-fbr.:..th purpose of relocating the three carports that Were constructed over City utility eas=ents. Based on a current site visit, the three carports have not yet been removed. The c'arport6 need to be removed soon to ensure access to the utilities in. the event needed.. This letter is to inform you that if the three carports are not removed from the City'sutility easemerit by February 15, 2003, a Notice to Correct will be issued and if required, a Notice of Violation * to fbllow. We do not wish to go to such lengths; howovcr, this situation cannot continue.' 1tease tAe the appropriate action to remove the three carports by February 15, 2003. If you have any questions, please call Lyle Chrisman at 425-771-0220, Ext. 1324. ;Sincer AViID YK GFD]EERT. PJEE. City Engineer DKG/ALC/mnc c: Jim Waite, Water/Sewer Division Manager Jei=ine Gra4 Building Official 11., 18 mwVW.6ft 0 9() ncor �;IHNIbLHW K)HbHU.0M 4WaX.ZU0,)414r4UU Mdq DU w IQ-vv UQ MAY-27-03 TUE 12:54 PM PINNACLE REALTY NW FAX NO, 2062330331 P. 02 I, :, GARY HWENSOW'. CITY OF EDMONDS i�i 3'rwAVENUE N011114 COMONW.VVAMM, (42S) 771.= - FAX (4,Uj 7714221 C4.formong; W4 U: ICES MPAMAGNT DEVELOPMCNT SM Bitildifig - Enginwirig Piviiing M aTC11 5, 2 003 Mr. Craig Dwyer Sunior Tnvcstment Manager 2R01 Alasktui Wuy, Suitc 200 Soralle. WA 98121 UK, Order to Correct Violation, Pselfie*Fark Apartment Carport.; Dmr*Mr. Divyer: Based upon (he ract that on March 4'j 2003 you applied for your demolition pamil to n rcirove the carports and providod wnitica-umatice (your e-mail to.Mario Harriw on. March 4, 2003) thel you wl�ll wnipleto the removal of the carporu by April 512003, tl�c. dmidlino rur compictimi of oic corrcctTvc action required by the Order to Correct Vltil:ition issued on February 19, 2003 is hereby extended 10 5-00 PM April 5, 2003. i r you havc any questions, pleasc don't hcsitale to call Lyle Chrisman or me at 42S 771 0220. Sincere!1yy 11) 9. (WINKRT, jrK City Enginccr Cc kinaine Oraf, rhffldinx Official - Lyle Chrixnw. Engineering PrognmMifuger Incory. 90 0 0 April 23, 2003 MEMO TO STREET FILE Pacific Park Apartments 23231 Highway 99 SUBJECT: Carport Demolition — Permit Ws 2003-0181, 2003-0182, 2003-0183 The Engineering Division verified removal of the carport footings and backfill with rock on 4/4/2003, 4/7/2003 and 4/8/2003. Lyle Chrisman, Engineering Program Manager, received a phone call from a lady affiliated with the Pacific Park Apartments a few days following inspection, stating that a water line had been hit during removal of the footings. No further phone calls or inspection requests were received regarding repair of a water line. A final Engineering inspection was performed April 23, 2003. At that time most of the asphalt patches were a little raised and there did not appear to be any soft spots. 410) Jeanie McConnell, Engineering Technician Date r I STANISLAW -ASHBAUGH, LLP Robert Smith ATTORNEY CERTIFIED MAIL RE -TURN RECEIPT REQUESTED Dave Gebert, City Engineer City of Edmonds 121 - 5th Avenue North Edmonds, WA 98020 April 8, 2003 Re: Parking Structures at Paciflc Park Apartments Dear Mr. Gebert: RECEIVED APR '1 0 .2003 E-NGINEERNG DIVISION email address robs@stanislaw-ashbaugh.coni cop., This law firm represents Pacific Park Apartments in connection with its dispute with the City of Edmonds over the location of certain carports at Pacific Park. As you know, Pacific Park constructed several carports on its property after receiving approval from the City. Nevertheless, despite the City's approval of the plans and despite the carports being built in accordance with the plans, the City now demands that some of these carports be torn down and relocated. The purported reason for the City's demand is that the carports were built over the City's water utility easement. It is undisputed that throughout the planning process and construction of the carports the City was well aware of the location of the carports and the utilities, yet said nothing to Pacific Park. It was only after construction of the carports was completed that the City decided to raise an objection. The City's silence regarding the location of the carports and utilities, coupled with its approval of the plans showing the locations of the carports (overthe utilities) and the various on -site inspections that allowed construction to go forward, caused Pacific Park to reasonably rely on the approved plans and the City inspectors to build the carports. Remarkably, rather than owning up to its mistakes, the City is trying to force Pacific Park to shoulder all the costs related to relocating the carports. Even more remarkable is that the City 4400 BANK OF AMERICA TOWER - 70 1 FIFTH AVENUE - SE,:17 LE WA 98104-7017, TELEPHONE 206-386-5900 - FAX 206-344-7400 - www.stanisfakv-ashbaugh.com 0 April 8, 2003 Page 2 threatened to fine Pacific Park $100 per day unless the carports were removed. Because of the City's demands and threats, Pacific Park has been forced to remove the carports at a substantial cost. Unfortunately for the City, it is the one that is responsible for these costs and all damages suffered by Pacific Park. The City's action in approving Pacific Park's construction plans was a land use decision, under the Land Use Petition Act (LUPA). Thus, if the City mistakenly approved the plans, then the City's exclusive recourse was to follow the procedures outlined in that Act. Unfortunately for the City, the time has long since elapsed for it to challenge the location of carports. See Chelan County v. Nykriem, 146 Wn.2d 904 (2002) (holding that an allegedly void building permit, if not timely challenged under LUPA, will be deemed valid). Therefore, pursuant to the decision in Nykriem, the carports Were validly constructed. The City's action in forcing Pacific Park to demolish the carports amounts to a governmental taking. We, therefore, demand compensation and other damages related to their removal. Be advised that we will take all necessary steps to vindicate Pacific Park's rights through litigation and will hold the City liable for all costs associated with the removal and relocation of the carports. We will also be seeking lost rent during the time Pacific Park was unable to charge tenants for those spaces. At this point, the City is liable to Pacific Park in excess of $70,000. Pacific Park, however, is willing to discuss an alternative resolution to this matter as such discussions may be in the best interests of all concerned. Please contact me within five (5) days of your receipt of this letter. If I do not hear from you, I will assume the City prefers to have this matter litigated and we will proceed accordingly. Very truly yours, Stanislaw Ashbaugh, LLP Sent unsigned to avoid delay J. Robert Smith JRS:Ir X:\CLIENT\57726\6656\LTRCity0l.doc 00,_. 0 0 ;f)o_jL -f- I —�— iz� PC. 189 CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 - FAX (425) 771-0221 Website: wwwci.edmondsma.us DEVELOPMENT SERVICES DEPARTMENT Planning - Building - Engineering March 5, 2003 Mr. Craig Dwyer Senior Investment Manager 2801 Alaskan Way, Suite 200 Seattle, WA 98121 RE: Order to Correct Violation, Pacific Park Apartment Carports Dear Mr. Dwyer: GARY HAAKENSON MAYOR Based upon the fact that on March 4, 2003 you applied for your demolition permit to remove the carports and provided written assurance (your e-mail to Marie Harrison on March 4, 2003) that you will complete the removal of the carports by April 5, 2003, the deadline for completion of the corrective action required by the Order to Correct Violation issued on February 19, 2003 is hereby extended to 5:00 PM April 5, 2003.. If you have any questions, please don't hesitate to call Lyle Chrisman or me at 425 771 0220. Sincerel ID K. GLEBERT, PE City Engineer Cc: ' Jeannine Graf, Building Official Lyle Chrisman, Engineering Program Manager Incorporated August 11, 1890 C;�4­ 1-;+., W-1,;­ T.— CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT 121 5th Avenue North, Edmonds, WA 98020 (425) 771-0220 ORDER TO CORRECT VIOLATION Location of Violation (Address and Tax Account Parcel No) - Pacific Park Apartment CWorts 0 23231 Highway 99, Building A,C and D, Edmonds, WA 98026 Tax Account Parcel No. 0057-670-000-1806 Issued To: Craig DMLer, Propegy Owner Address Of Person This Order Is Issued To: 401 2nd Avenue South, Suite I 10 Seattle, Washinglon 98104 Code Section Violated:. Unifonn Building Code Sections 106,108 & 109. Description of Violation: The property owner obtained building pennits to construct cnorts on the subject prope!ly (pennit reference #2001-0401, #2001,0400, 2001-0399). The owner/contractor failed to follow approved plans and constructed the cgMorts over a City utilily easement. The property owner was informed June 14, 2001 that the carports encroached over the Cijy easement but owner continued work in disregard of this notification. A letter was sent by the Cily Engineer on January 6. 2003 that reguired removal of the three cgMorts by FebruM 15, 2003. As of the date of this Order the c@Morts have not been removed and no demolition permit(s) have been obtained for removal. Corrective Action Required: Obtain the required demolition pennits for removal. of the three cnorts and remove structures from site. Correction is Required no later than: 5:00pm (time) March 5,2003 -(date) If correction is not made by the date and time specified in the Order, *a Notice of Civil Violation shall be issued. The Notice of Civil Violation shall assess fines of $100.00 per day, or portion of a day, during which the violation continues. Date Posted: Issuing Party. Signature Date Mailed: FebruM 19, 2003 Date Served Title Cily Engineer 6T" O's �1.0 C. 189 \3 January 6, 2003 CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 - FAX (425) 771-0221 Website: wwwdedmonclsma.us DEVELOPMENT SERVICES DEPARTMENT Planning - Building - Engineering Susan Harritt Pacific Park Apartments, LLC 23231 Highway 99 Edmonds, WA 98026 GARY HAAKENSON MAYOR RE: Relocation of Carports - Pacific Park Apartments at72-32-- 3-1 Highway 99 -7 Dear Ms. Harn*tt, According to the Building Division, you renewed two building permits in May, 2002, for the purpose of relocating the three carports that were constructed over City utility easements. Based on a current site visit, the three carports have not yet been removed. - The carports need to be removed soon to ensure access to the utilities in the event needed. This letter is to inform you that if the three carports are not removed from the City's utility easement by February 15, 2003, a Notice to Correct will be issued and if required, a Notice of Violation to follow. We do not wish to go to such lengths; however, this situation cannot continue. Please take the appropriate action to remove the three carports by February 15, 2003. If you have any questions, please call Lyle Chrisman at 425-771-0220, Ext. 1324. Sinceroyl., AVID IC GEBERT. P.E. City Engineer DKG/ALC/cmc c: Jim Waite, WateT/Sewer Division Manager Jeannine Graf, Building Official VAlettenWanitt-caMon removal.doc Incorporated August 11, 1890 0 �t-1 C. 1 sq" July 25, 2001 CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 - FAX (425) 771-0221 DEVELOPMENT SERVICES DEPARTMENT Planning - Building - Engineering Susan Harritt Pacific Park Apartments, LLC 23231 Highway 99 Edmonds, WA 98026 RE: Relocation of Carports — Pacific Park Apartments at 23231 Highway 99 Dear Ms. Harritt, GARY HAAKENSON MAYOR '� r, ritc We appreciate the time you took to meet with Engineering and Public Works personnel to discuss the problems and issues with the placement of carports over City -maintained utilities. As Lyle Chrisman from the Engineering Division discussed with you and your contractor, the drawings and building permit specified the carport posts were not to have been installed over the utilities. In addition, prior to start of construction, the Public Works Department representative told your contractor that the carports were not to be installed over the utilities or easement. Since our Public Works crews must have access to their utility lines for maintenance, the carports will have to be relocated to areas where no utility easements exist. Please take the appropriate action to relocate the three affected carports by August 17, 2001. In addition, a revised site plan must be submitted for approval. Be sure to show any and all utility locations around the new sites. We will expedite our review so this work can be done expeditiously. Once the resubmittals have been approved, your contractor will need to call for all required inspections. If you have any questions, please call Lyle Chrisman at 425-771-0220, Ext. 1324. Sincerely, :A� DAVID K GEBERT, P.E. City Engineer DKG/ALC/cmc c: Jim Waite, Water/Sewer Division Manager Jeannine Graf, Building Official DAMy Docutmnts\Engscc\DEVELOP\LyIeWtcrs\Harritt.dDc* Incorporated August 11, 1890 Sister City - Hekinan, Japan .1 17 C. 1 S9,11 0 CITY OF EDMONDS STREPADDRESS FILE PUBLIC WORKS DEPARTMENT - 7110 - 210TH ST. S.W. - EDMONDS, WA 98026 (425) 771-0235 - FAX (425) 744-6057 - E-MAIL: kIein@ci.edmonds.wa.us WEB SITE: wwwxi.edmondsma.us January 10, 2000 Manager, Pacific Park Apartments 23231 - Hwy 99 Edmonds, WA 98026 Re: Pollutant Discharge into Storm System Dear Manager: GARY HAAKENSON MAYOR A water quality discharge problem was brought to my attention on January 4, 2000. Storm maintenance crews observed a significant amount of an oily substance in a catch basin on 77 1h Ave. during routine maintenance. This residue was traced back through the drainage system and found to originate from a trash storage area in the east parking area of the apartments. This storm drain system flows directly into Lake Ballinger. The system is intended for storm runoff only and the water receives no treatment downstream. This means that fish and wildlife habitat are impacted by any pollutant discharges. The discharge of untreated waste into the water of the State constitutes a violation of RCW 90.48.080 of Washington State Pollution Control Law and could be subject to enforcement action which includes significant monetary fines. However, at this time we would only like to solicit your cooperation in cleaning this area up and taking appropriate actions to insure any pollutants are properly contained and disposed of. We request that this situation be corrected as soon as possible. Maintenance crews will be re -inspecting this system within two weeks. If you have any questions regarding this letter please feel free to contact me at 425-771-0235 ext. 648. Sincerely, '�Irn Kammerer Street/Storm Manager cc: Public Works Director Storm Lead Word ata\Street\PacificPark Incorporated August 11, 1890 Sister City - Hekinan, Japan 0 Date: From: MEMO FOR RECORD Feburary 15, 2000 Jim Kammerer Street/Storm Manager Subject: Storm Water Pollution at Pacific Park Apartments, 23231-SR99, Edmonds, WA During routine maintenance Storm Division crews discovered an oily substance in a catch basin on 77' Ave. which was traced to a trash storage area at the apartment complex. Attempts to contact the manager were unsucessful, so a letter was sent out on January 1 Ot' informing them of the problem. I was contacted on January 14 by the Pacific Park maintenance person (Bill) who insured me the area would be cleaned up by the 18t'. A follow-up inspection by the Storm lead on January 25 showed the area had indeed been cleaned up with no additional pollutants leaching into the storm water system. i% ,ATE RECEIVED �w E M P R IT EXPIRES USE PERMIT CITY, OFEDIVIONDS ZONE N U M B E 14: 0/ CONSTRUCTION PERMIT APPLICATION JOB SUITE/APT# ADDRESS OYIE R NAME/NAIvlE OWINESS PLAT NAME/SUBDIVISIONi NO. LOT NO. LID NO. LID FEE $ = MAILING ADDRESS L u z 3: 0 ,�o :_�14i PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP TESCP Apprwed C3 RW Permit Required 0; Street Use Permit Req'd C) CITY ZIP TELEPHONE EXISTING — PROPOSED 114 0 Insp ction Required Side.alk Required (3 15�547TZZ-;_ '5�9710)41 REQUIRED DEDICATION FT Underground Wiring required 0 NAM METER SIZE LINE SIZE NO. OF FIXTURES PRV REQUIRED YES 0 NO 0 3 0 uj uj ADDRESS REMARKS z z 0 �z OWNER/CONTRACTOR RESPONSIBLE FOR EROSION CONTROUDRAINAGE a cc 2?4:�q z CITY Zlfi EL�GONE NAME &k�� E NGINEERING IEWED/9ATE ADDRESS cc i4ey -51441 FIRE/, EQ04W DATE z CITY ZIP TELEPHONE 0 _57 VYIANCE OR CU SHORELIPE�O.FQA INSPECT "ON STATE LICENSE NUMBER EXPIRATION DATE CHECKED BY REO'D PBOND S :21T (:)YES &NO r — SEPA REVIEW SIGN' AREA ,. HEIGHT -j 'PROPERTY TAX ACCOUNT PARCEL NO. COMPLETE EXE P ALL.OWEDPROPOSED ALLOW . ED PROPOSED W _j EXP NEW RESIDENTIAL PLUMBING MECH LOT COVERAGE ALLOWED PROPOSED UIAED SETB I ACKS (FT.) ONT SIDE REAR PROPOSED SETBACKS (FT.) - FRONT URSIDE REAR Ej COMMERCIAL COMPLIANCE OR ADDITION — %1 z CHANGE OF USE f-1 REMODEL APARTMENT SIGN z 5 IL PARKINf2 VTAEA PLANNI REVIEWED . BY DATI RE E] FENCE REPAIR E] GRADING CYDS X FT) AR DEMOLISH TANK OTHER ROETAINING WALL RENEWAL R CKERY z (TYPE OF USE. BUSINESS OR ACTIVITY) EXPLAIN: P: CHECKEDBY TYPE OF QONST4CTION OCCUPANT Q. ICO GROUP (A NUMBER N�UMBEROF C IC IAL INPP�CTOR AREA OCCUPANT OF . I DWELLING I A S 17—451 o STORIES UNITS N E - ES IRED ;ky i LOAD DESCRIBE WORK TO BE DONE e,7a -1,fl;7ff 1 REMARKS PROGRESS INSPECTIONS PER UBC.108/FINAL INSPECTION REQ'D z 6 57 A Aj pt T9Z VALUATION FEE -71 sol:r 'PLAN CHECK FEE Z HEAT SY)URCE GJAZING % SLO % BUILDING q 7' PLAN CHECK NO: VESTED DATE PLUMBING MECHANICAL THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC D DOMAIN (CURBS, SIDEWALKSj DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. 2150 STATE SURCHA PERMIT APPLICATION:. 180 DAYS PERMIT LIMIT. 1 YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS -&Q�REVIEW FEES SEE BACK OF PINK PERMIT FOR MORE INFORMATION "APPLICANT, ON BEHALF OF HIS OR HER SPOUSE. HEIRS, ASSIGNS AND SUCCESORS Fwc� NSPECTION FEE W IN INTEREST. AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF j LANDSCAPING 2 EDMONDS, WASHINGTON, ITS OFFICIALS. EMPLOYEES, AND AGENTS FROM ANY AND INSPECTION FEE cc , ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY x FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE PLAN CHECK DEPOSIT DEEMEDTO MODIFY, WAIVEOR REDUCEANY REQUIREMENT OF ANY CITY ORDINANCE 0 NOR LIMIT IN ANYWAYTHE CITY'SABILITYTO ENFORCE ANYORDINARCE PROVISION.- X1 R CEIPT� TOTAL AMOUNT DUE I HEREBY ACKNOWLEDGE THAT � HAVE READ THIS APPLICATION; THAT THE INFORMATION APPLICATION APPROVAL GIVEN IS CORRECT, AND THAT AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC- CALL This application is not a permit until signedby the TION, AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED Building Otficial or 4is/her Deputy: and Fees are paid, and IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO FOR INSPECTION receipt is acknowledged in space provided. qION INSURANCE AND RCW 18.27. I WORKMEN'S ��EN� OFFIC I N DATE SIG4NATURAGENT) DATE S G ED (425) 771-0220 R&ELED BY, 15ATE ATTENT EXT 1333 T7� IT IS I INLA'i Fill TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL 771-0221 A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- ORIGINAL - FILE YELLOW - INSPECTOR CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 FAX PINK - OWNER GOLD - ASSESSOR 5/98 0 1 DATE RECEIVED -.0 �// /0 / "I PERMIT EXPIRES CITY OF EDMONDS USE PERMIT ZONE 60 NUMBER44V- c/) 4W CONSTRUCTION PERMIT APPLICATION JOB SUITE/APT# ADDRESS 0 ER NAME/NAME OF BUSINESS PLAT NAME/SUBDIVISION NO. LOT NO. LID NO. L M U MAILING ADDRESS �o r-�c WjyCC,- k,157 Ae� LID FEE $ PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP EXISTING PROPOSED REQUIRED DEDICATION— FT TESCP Approved 0 RW Permit Required 0 Street Use Permit Rsq'd E] Inspection Required 0 Sidewalk Required 0 Underground Wiring required CITY ZIP W 72z; [TELE PHONE NAME METER SIZE LINE SIZE NO. OF FIXTURES PRV REQUIRED YES 0 NO 0 LU ADDRESS �7' REMARKS OWNEWCONTRACTOR RESPONSIBLE FOR EROSION CONTROUDRAINAGE z leAwIft75 CITY ONE 7y, f I4*q 7 %,tNGINEERING VIEWED/90E/ 2 TELEPHONE STATE LICENSE NUMBER EXPIRATION DATE PROPERTY TAX ACCOUNT PARCEL NO. NEW RESIDENTIAL PLUMBING / MECH ADDITION 0 COMMERCIAL o COMPLIANCE OR CHANGE OF USE REMODEL APARTMENT SIGN REPAIR GRADING- 0 FENCE CYDS X DEMOLISH 0 TANK OTHER ICA GARArF RETAINING WALL ROCKERY 0 RENEWAL (TYPE OF USE, BUSINESS OR ACTIVITY) EXPLAIN: —I NUMBER NUMBER OF 7:;� CRITIC F ) . DWELLING 1 AREAS STORIES' UNITS NUMB -0 DESCRIBE WORK TO BE DONE . HEAT S)DURCE GLAZI,NJS % I %, — &6�he I tVvf--4� W DATE .FIR C wwj-4 VfRIA.NCE OR C SHORELINE O%gfi�.-/ INSPECTION BOND BY 200—Of REOX'D 0 YES No IPOSTED SEPA REVIEW SIGN AREA COMPLET E EXEMPT ALLOWED PROPOSED HEIGHT ALLOWED PROPOSED , EXP LOT COVERAGE REQUI ETBACKS,(FT.) PROPOSED SETBACKS (FT.) ALLOWED PROPOSED FR SIDE REAR FRONT 1 UR SIDE REAR PARKING ARE PLANNING REVIEWED BY DATE It REO-D I PROVIDED t-� r/- IL 11 f LL 0(j< , 51/pll FT) I REM5&S Al CHEAED BY TYPE r()NSTRUCTION cow OCCUPANT GROUP SPECIAL IN PVTOR JAREA OCCUPANT Q TFR E YES �LOAD 'i U' R R EMARKS P p OC ROGRESS INSPECTIONS PER UB,C 10.8/FINAL INSPECTION REWD VALUATION FEE PLAN CHECK FEE BUILDING PLAN CHECK NO: PLUMBING MECHANICAL THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC :5 DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE 5 SEPARATE PERMISSION. STATE SURCHARGE W PERMIT APPLICATION: 180 DAYS PERMIT LIMIT: 1 YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS ENG. REVIEW FEES SEE BACK OF PINK PERMIT FOR MORE INFORMATION "APPLICANT, ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESORS ENG. INSPECTION FEE W i IN INTEREST, AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF LANDSCAPING 2 cc EDMONDS, WASHINGTON, ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND INSPECTION FEE 4 ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY. x FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE PLAN CHECK DEPOSIT RECEIPT a -j DEEMED TO MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE 0 NOR LIMIT IN ANY WAYTHE CITY'SABILITY TO ENFORCE ANYORDINANCE PROVISIOW" TOTAL AMOUNT DUE 1 HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION: THAT THE INFORMATION APPLICATION APPROVAL GIVEN IS CORRECT;AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC- CALL This application is not a permit until signed by the TION: AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED Building Official or his/her Deputy: and Fees are paid, and IN VIOLATION OF THE L_AQOR CODE OF THE STATE OF WASHINGTON RELATING TO FOR INSPECTION receipt is acknowledged in space provided. WORKMEN'S AND RCW 18.27. =E=IPIIISURANCE (425 OFFICAPSIPATU DATE I SIGNATUR DATE SIG ED?/ 771-0212 0 RELEASED BY [YATE ATTENTIOK EXT 1333 IT IS UNLAWFUL TO USE.OR OCCUPY A BUILDING OR STRUCTURE UNTIL 771-0221 A FINAL. INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109- ORIGINAL - FILE YELLOW - I FAX PINK - OWNER GOLD - ASSESSOR 5/98 �PATE RECEIVED ON CITY OF EDM DS CONSTRUCTION PERMITAPPLI CATION OWNR NAME/NAME OF BUVESS ( 447 k L cc MAILING ADDRES U s /00 0 CITY ZI ELEPHONE 7 0 2. /J-- 2- eINAIVII: Uj ADDRESS, I v" A" n(-1 PERMIT EXPIRES PERMIT N U M B E R SUITEJAPTI ME/SUBDIVISION NO. LOT NO! LID NO. 6 I LID FEE $ 1IGHT OF WAY PER OFFICIAL STREET MAP TESCP Apprwed RW Permit Required 0 C] 0 Street Use Permit Req'd 0 PROPOSED Inspect on Required 0 Sidewa:k Required 0 ED DEDICATION— FT Underground Wiring required 0 31ZE LINE SIZE NO. OF FIXTURES PRV REQUIRED YES 0 NO 0 :ONTRA&O� RESPONSIBLE FOR EROSION CONTROL/DRAINAGE IJU z z ING 1, R�VIEWED/DATE 1W'5' cc ADDRESS FQE�VIE;*B D AT7 U) ZIP TEL CITY EPHO z 151 LL 0 CIA 4 L 0 A9A 4d W IfF RIANCE 0 SHORELINE OR ADB# INSPECTION BOND STATE LICENSE NUMBER EXPIRATION DATE CHE KED BY . p REQ'D POSTED ;�IU 0 YES 3-Ir-04 SERA REVIEW SIGN AREA HEIGHT PROPERTY TAX ACCOUNT PARCEL NO. b?V 000 COMPLETE I EXEMPT ALLOWED PROPOSED ALLOWED ED P"OPOS W 'mg k Vo /4? 494 EXP NEW RESIDENTIAL PLUMBING MECH LOT COVERAGE REQUIRED SETBACKS (FT.) PROPOSED SETBACKS (FT.) ALLOWED PROPOSED FR T SIDE REAR FRONT URSIDE REAR COMMERCIAL COMPLIANCE OR - ------- z ADDITION z . CHANGE OF USE z PARKING L T EA PLANNINGBEVIEWED BY DATE r 0-,-REMODEL APARTMENT 0 SIGN REO'D I PROWD GRADING FENCE L5 bl, M REPA 0 CYDS 1:1 X FT) RE KS f—] DEMOLISH 0 OTHER. TANK RETAINING WALL 0 RENEWAL ROCKERY r- (TYPE OF USE. BUSINESS OR ACTIVITY) EXPLAIN: CKED BY TYPI�O�FONSTR!JfTION cong OCCUPANT -W A GROUP (A Ui' uu NUMBE4 NUMBER OF CRIT11 a WELLING AREA W OF OCCUPANT o STORIES NITS NUM REQUIREIDINWy'ES Im -710:5yr-T- LOAD DESCRIBE WORK TO BE DONE REMARKS PROGRESS INSPECTIONS PER UBC 108/FINAL INSPECTION REQ!b _j 71-- 4b f4�4)0_� (01 7 -PA)) up V67 7 7 -2 1 N9 !VALUAT ION FEE S�? PLAN CHECK FEE H�J_ GLA41NG % LOT SLOPE )az. .2 BUILDING 0: VESTED DATE PLAN CAECK 1PLUMBi.N6 THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WOIR�'TO t E DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC B DOMAIN (CURBS. SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE GRA.DING/FILL SEPARATE PERMISSION. ILI PERMIT APPLICATION: 180 DAYS - STATE SURCHARGE PERMIT LIMIT* I YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS ENG. REVIEW FEES SEE BACK OF'PINK PERMIT FOR MORE INFORMATION "APPLICANT. ON ENG. INSPECTION FEE BEHALF OF HIS OR HER SPOUSE. HEIRS. ASSIGNS AND SUCCESORS Lu IN INTEREST, AGREES TO INDEMNIFY� DEFEND AND HOLD HARMLESS THE LANDSCAPING _j CITY OF 2 EDMONDS, WASHINGTON, ITS OFFI61ALS,:EMPLOYEES, AND AGENTS FROM ANY AND INSPECTION FEE cc ALL CLAIMS FOR DAMAGES OF-W V-gg"�ATURE, ARISING DIRECTLY OR INDIRECTLY x FROM THE ISSUANCE OF TO PiRlullt..�. ISSUANCE OF THIS PERMIT SHALL NOT BE PLAN CHECK DEPOSIT RE7T -74 01 DEEMED To MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE 74/ _j 0 NOR LIMIT IN ANY WAYTHE CITY'S ABILITY TO ENFORCE ANY ORDINANCE PROVISION.. x R CEIPT — TOTAL AMOUNT I I?K // )UE I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION GIVEN IS CORRECT, AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF APPLICATION APPROVAL THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC- CALL This application is not a permit until signed by the TION; AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED Building Official or his/her Deputy: and Fees are paid, and IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO FOR INSPECTION . receipt is acknowledged in space provided. WORKMEN'S COMPEN��N INSURANCE AND RCW 18.27. OFFIC AT DATE DATE SIG SIGNATUREA OR ENT NE (425) (L V -0220 RELEA�FD BY DATE 7 771 A17ENTIOV EXT/333 IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- 771-0221 ORIGINAL - FILE YELLOW - INSPECTOR CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 FAX PINK -OWNER GOLD - ASSESSOR 5/98 DATE RECEIVED CITY OF EDMONDS CONSTRUCTION PERMIT APPLICATION ER NAME/NAME OF WSINESS It 1= MAILING ADDRESS w z Aee Ae�7 0 CITY ZIP TELEPHONE �,19,7721,,:5- NAj ADDRESS Ix x ? &/; �; /v/ CIT) ZIP 10,'�'..TrtLE*NE NAME Cc ADDRESS 0 l'- L) Pa &7,V, 1—au CITY ZIP TELEPHONE z 0 �,�Zlzvze,,_P 46A�V 15,�WYZ STATE LICENSE NUMBER EXPIRATION DATE I CHECIKED BY PROPERTY TAX ACCOUNT PARCEL NO. NEW RESIDENTIAL ADDITION COMMERCIAL REMODEL APARTMENT REPAIR E] GRADING CYDS DEMOLISH TANK RETA NING WALL ROCKERY (TYPE OF USE, BUSINESS OR ACTIVITY) EXPLAIN: NUMBE�R NUMBER OF [—] PLUMBING / MECH oCOMPLIANCE OR CHANGE OF USE SIGN FENCE ( X FT) f--j OTHER M RENEWAL OF DWELLING AREAS CV — STORIES UNITS NUMBER 4VII_ DESCRIBE WORK TO BE DONE PERMIT EXPIRES USE PERMIT / ZONE NUMBER-W-2, JOB ADDRESS ,,- %11 SUITE/APT# 6VI PLAT NAM E/SU BDIVI SION NO. LOT NO. LID NO. LID FEE $ PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP TESCP Apprwed AW Permit Required 0 0 Street Use Permit Rsq'd 0 EXISTING — PROPOSED Inspect on Required CI SIde.a:k Required 0 REQUIRED DEDICATION— FT Underground Wiring required 0 METER SIZE LINE SIZE F FIXTURES PRV REQUIRED YES 0 NO 0 M REMARKS uj z OWNER/CONTRACTOR RESPONSIBLE FOR EROSION CONTROUDRAINAGE 77 z uj E N (JINEERING 71t;$'12 REV ,REVIE D DATE uu LL VAR CU SHORELINE CQaaWl._�' INSPECTION BOND 1000 REO'D POSTED 0 YES XNO SEPA REVIEW SIGN AREA HEIGHT COMPLETE EXEMPT ALLOWED PROPOSED ALLOWED PROPOSED EXP I , W LOT COVERAGE REQUIRED SETBACKS (FT,) OPOSED SETBACKS (FT) ALLOWED PROPOSED FRONT SIDE REAR R SIDE REAR z Z PARKING LOT AREA NNING REVIEWED BY DATE RE a IDED I —1 f//4 AI I CHECKEDBY ITYPEOF PJSTRUCTION CQjQE OCCUPANT 14, Q n GROUP I)/ _� SPEC�IAL INJ;PFCTOR AREA OCCUPANT REO IREZ YES LOAD REMARKS PROGRESS INSPECTIONS PER UBC 108/FINAL INSPECTION REO'D a " VALUATION FEE PLAN CHECK FEE -71,6 0-5 Q - . /7/ HEAT $OURCE G.LAJING % LOT SLO /\/ - % BUILDING PLAN CHECK NO: VESTED DATE PLUMBING U I I �?_10 ____ . MECHANICAL THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DFU VEWAYS, MARQUEES, ETC.) WILL REQUIRE Q&AQAEh1FILL t SEPARATE PERMISSION. 2 STATE SURCHARGE M PERMIT APPLICATION: 180 DAYS Lu IL PERMIT LIMIT. 1 YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS ENG. REVIEW FEES SEE BACK OF PINK PERMIT FOR MORE INFORMATION "APPLICANT, ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESORS ENG. INSPECTION FEE Uj IN INTEREST, AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF I LANDSCAPING 2 EDMONDS, WASHINGTON, ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND INSPECTION FEE M et ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY T- F 0 ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE PLAN CHECK DEPOSIT RECEIPT DEEMED TO MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE 0 NOR LIMIT IN ANY WAY THE CITY'S ABILITY TO ENFORCE ANY ORDINANCE PROVISION." x I R CE7T- . TOTAL AMOUNT DUE 1 HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION APPLICATION APPF(OVAL GIVEN IS CORRECT AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC- CALL This application is not a permit until signed by the TION; AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED Building Official or his/her Deputy: and Fees are paid. and IN VIOLATION OF TH R CODE OF THE STATE OF WASHINGTON RELATING TO FOR INSPECTION receipt is acknow.%dged in space provided. %NORKMEN'S C2$PEN I BANCE AND RCW 18.27. OFFICIAL UR DATE SIGNATUR OKVV 0 GENT) DATE SlGtytD (425) �), 771-0220 REL SED BY ATTENTIOW EXT 1 �333 IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL 771-0221 A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 FAX ORIGINAL - FILE YELLOW - INSPECTOR PINK - OWNER GOLD - ASSESSOR 5/98 DATE RECEIVED hi [PERMIT EXPIRES CITY OF EDMONDS USE ZONE PERMIT .6t NUMBER,,O,.�-tl�-IeS CONSTRUCTION PERMIT APPLICATION JOB S,UITE/APT# ADDRESS OF B PLAT NAME/SUBDIVISION NO. LOT NO. LID NO. _9WbLEBjAME/NAME LID FEE $ cc W z 0 MAILING ADDRESS Ab PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP EXISTING � PROPOSED REQUIRED DEDICATION— FT TESCP Appm;_d 0 RW Permit Required 0 Street Use Permit Req'd 0 Inspection Required C3 Sidewalk Required C1 Underground Wiring required 0 C Y IT ZIP 2 7 T/ & TELEPHONE I F- NAME METER SIZE LINE SIZE NO. OF FIXTURES PRV REQUIRED YES 0 NO 0 -- — 3 cc 4 ADDRESS Z�& REMARKS OWNER/CONTRACTOR RESPONSIBLE FOR EROSION CONTROLJDRAINAGE UJ z CITY ZIPLJ­C[TE�gIHONE NAME cc cc t- z 0 C INEERING REVIEWV/DATY S A ,2� ADDRESS F1 E E ATE re W LC IL CIT ZIP 5�"7w TELEPHONE P ARIA SHORELINE qkaqWI,,`i` 1-000-141 INSPECTION REO'D oyEs XNO I BOND POSTED - STATE LICENSE NUMBER EXPIRATION DATE CHECKED BY SEPA REVIEW SIGN AREA HEIGHT W .GL PROPERTY TAX ACCOUNT PARCEL NO 61V5 7 h7A COMPLETE I EXEMPT EXP ALLOWED PROPOSED ALLOWED . PROPOSED NEW �ESIDENTIAL C] PLUMBING I MECH ADDITION COMMERCIAL o COMPLIANCE OR CHANGE OF USE REMODEL APARTMENT SIGN GRADING FENCE f-1 REPAIR CYDS X FT) LOT COVE A IP3 OE ALLOWED PRO SED REQUIRED SETBACKS (FT.) FRONT SIDE REAR I I !I- PROPOSE6SETBACKS (FT.) FRONT L/R SIDE REAR / ,<-- y f I z PARKING REO'D PROVIDED LOT AREA P Nl�,p REVIEWED'BY DATE �Abl REMARKS DEMOLISH E] TANK OTHER P: 0. Ex w o ROETAIERING WALL RENEWAL R CK Y (TYPE OF USE. BUSINESS OR ACTIVITY) EXPLAIN: CHECKED BY TYPE QE-QQNARUCTION _V., IN OCCUPANT GROUP I (A NUMBER OF STORIES 1 NUMBER OF DWELLING UNITS 1 _6�— CRITICAL AREAS 1 NUMBE%,V SPECIAL IN CTOR REQUIREDX YES JAREA OCCUPANT LOAD� DESCRIBE WORK TO BE DONE REMARKS PROGRESS INSPECTIONS PER LIBC 108/FINAL INSPECTION REO'D -1j: 41 -Mr VALUATION FEE PLAN CHECK FEE HEAT S URCE G!LAPNG % LOT SLOPE % BUILDING 1yoroc- 41,70 :z PLAN CHECK NO: VESTED DATE PLUMBING S-b MECHANICAL THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC M DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE 4RA434"/FILL A 15 t SEPA RATE PERMISSION. I STATE SURCHARGE cc w PERMIT APPLICATION: 180 DAYS it. PERMIT LIMIT. 1 YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS ENG. REVIEW FEES .SEE BACK OF PINK PERMIT FOR MORE INFORMATION GO APPLICANT, ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESORS ;N ENG. INSPECTION FEE ujj INTEREST, AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF LANDSCAPING 2 EDMONDS, WASHINGTON, ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND INSPECTION FEE ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY X1 FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE PLAN CHECK DEPOSIT RECEIPT a -i DEEMED TO MODIFY, WAIVE OR REDUCE ANY REQUI REMtNT OF ANY CITY ORDINANCE 0 NOR LIMIT IN ANY WAY THE CITY'S ABILITY TO ENFORCE ANY ORDINANCE PROVISION.' x TOTAL AMOUNT DUE RECEIP� 7 1 HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION /9 APPLICATION APPROVAL GIVEN IS CORRECT; AND THAT I AM THE OWNER. OR THE DULY AUTHORIZED AGENT OF THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC- CALL This application is not a permit until signed by the I TION; AND IN DOING THEZORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED Building Official or his/her Deputy: and F eas are paid. and IN VIOLATION OF,?19 LA�OR CODE OF THE STATE OF WASHINGTON RELATING TO FOR INSPECTION receipt is acknowledged in space provided. WORKMEN'S VVPENSATE�,�ANCE AND RCW 18.27. SIGNATUR NER G NT) DATE SIG ED L= (425) �NATU DATE 2A 771-0220 RE6�A�iD BY DATE ATTE TIOW EXT 1333 Ado � IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL 771-0221 FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIF1 .A CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 IK(QPFrTrZ FAX PINK - OWNER - GOLD - ASSESSOR 5/98 ta N -egg "'N 93.6 24 A-V 9 9 0.0 2 S DQ A -J St VA 1AA & j 9 'S C A 8 AT i A-1 A10. 70,p vf'Q V4 7,'0 A; C1% it ;'Al V,,Z T VA JB& IND 3A P. ;7 IR Co.., JA I 10.9 9,7 U11LITf A5 EU1 ST06UA DRA&j4&& 1_� Aj C A Z 1 40' V- D,':;' W-4 r,�. f-'A ',' F. -1 C1.1. lr;�.'? - : DA, A.,,, S J 0 G 1'.-e 0 AcAA--' 0:AP S�74� /go' —N /A A Af I A.VO 6",ro 0.�f:50!T'.ICALAMIF 10 rAIA�r '5*7D. PjAA1 ,IP ISI jilq, , - I - 'k Oiwi:4 /0 49 V's:/'O' I AT 1 -1451 �O/v."ry A"M O,qfCr&y Cold 14.04014. 4-t-A Ik 0; 4 S*7_0 GAIII C49 C� C' A ry M PA rA 4. Oa'r11,r ?'�O'f /WiFA7 SA A4i GA, 14 4. 8 6A. rlPk A f I ;r p,12.4 10-iA,U wi.-,l 2.0 ir- 07/0 f�1^4 G 0 00. 0 5' 7 le A If QET-ft-RAL NOTEI 1'. All work mistarials. shaT4 be In with O-W OtSndArdD and spvcIf4!e*" of it -Is City of Erth 00 end "Itto. of " A~ S411119411rdil, And SpGQ1nMboM.'. except as 1,110diftod herl"I'livhin 2.,-. it shall be the awtipsot roSpOinalbilley to secure all necessary permits, P~ to searting construction. 3* All too IS O.&j t.1 Inspection Oy the City oV Ediriandli, and d.. _T cortzractor Shall notify the Ci their sctadul* in suf"clent time to Permit Inspection C PrIcle to and during dle 4 ' Th. exIntractor shall Ml#ft City of Ecinwincio-Dep.,"m of Public Wor4ta In tima to De,,mit Wispection or "*jv:xnm se-e-s Prior to Moswilling. 5. Upon 6onVt4tion of the so Itinprovomerta; Ard'wrv%,Vreur4 utilities, the cot— t trsc*or shall ruritish an iss-4buiWlitan, to " City of Edinonds "on Indicates that location or all site irnprowsmert% , fMkXRrq side se-er taterals or max,* or CAPie, pentif-6m lnllc�xiotion. 6. Th. contractioe *all *ej 'ftw�wa to finish W�diiw upon completion of finsi road and lot 9r.,dse. T. All co"uWad onatal pip. (C*AP) "It be aluminun,%,, 18 gauge. with HelicaL corrugations. 0. E3*ddjVfbrCOrruq&jedrrabsjswwer stall be CIS" 0. Mkt1v%.beddirVrn&tOrW shall rot contain stonse; tArV*r ~ 3 inch". frdZG^ rOOM, Or MOISOUre In OXCOMIN Of that par,niCting thorough compaction. 9. Bedding and backfIll contacted to W% of maximum density, except rorwp 12 inches of the dri L " &-,bsrwft v&-I! ce cwpacto qV% of m"tff—" -ratty. 1:4001ni; end bacsirill to be 001 itiasid In *muitt—um of a- line. to. Prepertyinwarvarstolsqui. of the tire jr191ge, System vA thin property if -a. 11. A ' it Mnoff to be di..a`� dr&,n&;q yetqn,. .2 The contractor shall be responisible fo the Installation of side sawer (laterals .r; .6) and thA placing of 2-** 4 rrwLrk*rs with the length and depth of laterals and teas inscribed on thii mar ra. 13. Upon completi of ths site Impraivamisnits; arid underground utilities. the. COX cf;ntractor shalt-furn h an as—uilt plan to the City of Edmonds which indicates this location or all site i IS tnicluding side sewer laterals or teas, *or other pertinent informati 04 14, All Sanitary wer pipes shall be r%A)ber gasket Concrete or PVC ASTM-D 3033 or 0 3OU sewer with AiIWA SpeCifiCati.onS, Section 60, unless olherwise noted. 0' to cafTn 15. -rho contrac shall alp, st rrenrdia frames to finish grades. upon completion of jinal road arid lot 1. . .. .: 16. All Side Se branch larAS shall be min. of 6" diameter- 17.� ClearIoutS 11 be plabid 30" f a MAy 1 2001 �TERMIT Cour 0 A C4