23326 74TH AVE W.PDF11111111 lill
5897
23326 74TH AVE W
0-1
,.City of Edmonds
RIGHT-OF-WAY CONSTRUCTION
PERMIT
A. Address or Vicinity of Construction:
Permit Number- q 7 7�a�/
f
Usue Date: 5,/7-17
.2,3 3.0,6 - -) A -it fV - w -
B. Type of Work (be specific):
890 loo
C. Contractor: S'0 a q_ 0 Contact: y zi,
Mailing Address: 0 1 Tf Vl*"4\/ "161 Phone: U) o 3
-7jZy---
State License #: . W,� !S . Liability Insurance: Bond: $
D. Building Permit # (if applicable):
E. 0 Commercial 0 Subdivision-
E] Multi -Family Single Family
INSPECTOR-
F. Pavement or Concrete Cut :
Side Sewer Permit # (if applicable):
El City Project 0 Utility (PUD, GTE, WNG, CABLE, WATER)
0 Other
INSPECTOR:
b(Yes 0No G. Size of Cut:
APPLICANT TO READ A.
x 11V. H. Charg,��_$_
. F4
SIGN
INDEMNITY. Applicant understands and by his signature to this'application, agrees to hold the City ofEdmondg harmless from injuries, damages, or
claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmond8, or any of its departments or
employees, including or not limited to the defense ofany legal proceedings including defense costs, and attorney fees by reason ofgranting thispermit.
THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL
I
INSPECTION AND ACCEPTANCE OF THE WORK ESTIMATED RESTORATION FEES WILL BE HELD UNTIL THE FINAL STREET PATCH
IS COMPLETED BY CITY FORCES, AT WHICH TIME A DEBIT OR CREDIT WILL BE PROCESSED FOR ISSUANCE TO THE APPLICANT.
Construction drawing of proposed work required with permit application.
A 24 hour notice is required for inspection; Please call the Engineering Division, 771-0220.
Work and material is to be inspected during progress and at completion.
Restoration is to be in accordance with City Codes.
Street shall be kept clearr at all times.
Tfaffic Control and Public Safety shall be in accordance with City regulations as required by the City Engineer.
All street cut ditches shall be patched with asphalt or City approved material prior to the end of the4orking day;
NO EXCEPTIONS.
Ihaue read the above statements and understand thepermit requirements and thepink copyof the�oerm4it willbe
available on site at all1imes for inspection purposes.
Signature: Date: 3)-)l
(CAtractor or Agent)
CALL DIAL -A -DIG PRIOR TO BEGINNING WORK
FOR'CITY USE'ONLY
APPROVED BY:
TIME AUTHORIZE,D: VOID AFTER, A,
SPECIAL CONDITIONS: Fc-t
RIGHT OF WAY DEPOSIT
DISRUPTION FEE/FLJND.tl I:
RESTORATION FEE:
PERMIT FE, 5n no
TOTAL FEE:
COMMENTS: RECEWT. FEE:
-DATE: ISSUED',BY:
NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE
Eng. Div. 1994
FIELD INSPECTION NOTES
I Comments:
I Diagram.:
(Fund 111 - Route copy to Street Dept.)
I
X
e
CONTRACTOR CALLED FOR INSPECTION El YES El NO
Partial Work Inspection by P.W.:
Work Disapproved By: Date:
FINAL APPROVAL BY: Date:
I j
SUBSTATION
CIRCUIT NO. a-- PHASE 3
c- 2— P
x Pvq
-T%Al
3218
32"
x-
3 42
a -cc- ftok,-Xvv"
as� 2-5 P-13040
F Im
c—
14- q_'L
4�_ 4�
SNOHO t6 V-z A�
mi�i uNTYTUBIlC UTILXrY DIS'MCT NO. -I
u"i 27 M,70
A:,; ck
t
-4
JET
c� A
-1476�
kov. 12/94
Ap �L' 331 _�L� SO
LOCANTION: .2--3-S 2-(- 6,y ev c-
'POLEI�-g 1/4 SL�,TT_) R Z4 DATE W.O. #
eltql\\ _3 W ENGINEEl'i-T-Or'6�< DWG. # 19 _S1
REASON FOR WORK
DRAFTER U.G. #
Th.,
SCALE. it
DATE WORK COMPLETED FOREMAN
ADDonvpn DATE PRINTED
FEES REOUIRED:
0 YES 0 NO
ENVIRONMENTAL ANALYSIS
0 EXEMPT 0 NOT EXEMPT
PARA. 181 ITEM C
PRIMARY OVERHEAD
O.H. U.G. COND. KV
URESIDENTIAL U COMMERCIAL
ADD _CKT. FT. PH
LEO
REM _�CKT. Fr. PH
$
NET —CKT. Fr
SECONDARYOVERHEAD
O.H U.G. COND. KV
BASIC FEE.
$
ADD CKT. FT. PH
/@$_/ =
$
REM — CKT. FT. —PH
NET _CKT. FT.
METER/CONV. POLE
s
PERMITS (DATE GRANTED)
U TREE TRIM
PRIMARY UNDERGROUND
U RESIDENTIAL U COMMERCIAL
BASIC . FEE
$
0 STATE
LEU #
$
U COUNTY
Is CITY
$
u
EASEMENTS
$
Cl REQUIRED U NOT REQUIRED
SECONDARYUNDERGROUND
BASIC FEE.
$
$
UNDERGROUND PLAT
DATE RELEASED —
BASIC FEE
$
$
FOREIGN CONTACTS
U GTNW JPN #_
STREET LIGHTING
U CATV JPN #
$
*JOINT TRENCH GTNW & CATV
*JOINT BORE GTNW & CATV
WORK IN RIGHT-OF-WAY
U PRIMARY
0
POLE STENCILING
USECONDARY
ofit 0
$
FROM —TO
TAKE OFF POLE
MISCELLANEOUS FEES
PRE-CONSTR. REOUIREMENTS
VAULT $
PERMIT
$
13 TREE TRIM 0 PUD LOCATOR
$_
UBACKHOE U FLAGGING
$
0 ONE CALL DATE
TOTAL DUE:
$
INDEX
1POLES1
I PLAT
DATE PAID
LOGS
U-MAP
I
-R-F—MR
C-MAP
RECEIPT #
LOCATION MAP PAGE
NEW SVC APPLIC. #
2-10
d\-
3321
3319 3322
//z/
4.
)o
cr
W5 13, 3L2 6�
2
��3407 m
fA
pol it -
v)
2-68
Z404
CA FILE NO. 9 q-_1 1--" -,
STREET FILE
Critical Areas Checklist
Site Informat,ion (soils/topography/hydrology/vegetation)
1. Site Address/Location:
2. Property Tax Account Number: /7(9#e -0-)"
3. Approximate Site Size (acres or square feet): 41Y -
RECEIVED
4. Is this site currently developed? X yes; no. APR 1 2 1994
If yes; how is site developed? PERMIT COUNTER
5. Describe the general site topography. Check all that apply.
Flat: less than 5-feet elevation change over entire site.
Rolling: slopes on site generally less than 15% (a vertical rise of 10-feet over a
horizontal distance of 66-feet). .;�e
Hilly: slopes present on site of more than 15% and less than 30% ( a vertical rise
of 10-feet over a horizontal distance of 33 to 66-feet).
Steep: grades of greater than 30% present on site (a vertical rise of 10-feet over a
horizontal distance of less than 33-feet).
Other (please describe):
6. Site contains areas of year-round standing water:. _�ao Approx. Depth:
7. Site contains areas of seasonal standing water: NtO Approx. Depth:
What season(s) of the year?
8. Site is in the floodway )gJ2 floodplain of a water course.
9. Site contains a crpek or an area where water flows acrgss the grounds surface? Flows are year-
round? Flows are seasonal? (What time of year?
I ; meadow
10. Site is primarily: forested shrubs mixed
urban landscaped (lawn,shrubs etc)
11. Obvious wetland is present on site:
DETERMINATI
-STUDY REQUIRED.; CONDITIONAL WAIVER:
:WAIVER
4-
Reviewed
Rev 01A)V94
&-00 . 199 -
City of Efton&
Critical Areas Checklist
The Critical Areas Checklist contained on
this form is to be filled out by any person
preparing a Development Permit
Application for the City of Edmondsprior
to his/her submittal of a development
permit to the City.
The purpose of the Checklist is to enable
City staff to determine whether any
potential Critical Areas are or may be
present on the subject property. The
information needed to complete the
Checklist should be easily available from
observations of the site or data available at
City Hall (Critical Areas inventories, maps,
or soil surveys).
An applicant, or his/her representative,
must fill out the checklist, sign and date it,
RECEIVED
APR 1 2 1994
PERMIT COUNTER
and submit it to the City. The City will
review the checklist, make a precursory site
visit, and make a determination of the
subsequent steps necessary to complete a
development permit application.
With a signed copy of this form, the
applicant should also submit a vicinity map
or plot plan for individual lots of the parcel
with enough detail that City staff can find
and identify the subject parcel(s). In'
addition, the applicant shall include
other pertinent information (e.g. site
plan, topography map, etc.) or studies in
conjunction with this Checklist to assist
staff in completing their preliminary
assessment of the site.
I have completed the attached Critical Area Checklist and attest that the answers provided are
factual, to the best of my knowledge (fill out the appropriate column below).
Owner / Apolicant:
/_ Y L L E, iaXA Zl,�
Naxne
23 33 -7!Z 7-4 Z, 0
Street Address
Appficant Representative:
Nam
Street Address
, e4 & (tJd 7X- -� K_ � F - ;,
City, State, ZIP - Phone City, State, -ZIP
,<,av
Sffnapfe
Signature
Phone
Date
1
\t)f-7 STREET FILE
ril
0
M
W
N
0
76- t?
U
0
1-3
1)t� I U C
0
0
M-
ZI,
ro
JO
M 0
0
:LAI
rn
0
0
M
P
P
(A
CA
0
MITE, NOWARRAMYOFACCURCY Th ir
attached MaP Was COMPRed b Use by the Cit 8 Information shown on' *9�� IA!4 (A
yofEdmond�,J-,--,
40m; consultants. The MY 01 Eftends &-es neh
-M4MiMset-jorth-j)n-jhe-fiVg- - -931OU UlQc' ,
- —my POrso ore fity requ-,.
L"'; Eon duct an Independeid k*lry r@ n
9ardlngthelnfurtii,-j--,�.,,,-
Includipg, but not ImIted to, the location of an-
Clc.,J Such sevier stubs may Or may not Me and mayor ir, J
zt,
shr,';In, Neither the CRY of Edmonds nor its C'_,-,�
-3 O'� t-3 hble foi the InformaIon given on this map ncr fc;
Pr�vlded based ur,(,,
r.,
T ?�-
L C%
ff
"M
F,
FA
4
0
�U
M
0
0
0
U1
M C
0
z
0 0
%
C.
City of dmonds
RIGHT-OF-WAY CONSTRUCTION.
PERMIT
Permit Number. qq (A
Lssue Date:
A. Address or Vicinity of Construction: 23326 74th Ave W (107006750)
D f W-Ar ft- Install a 2" PE Plastic Pipe gas main in 73rd
/I? c_1 S AW-W; tie rrito—�Rottnq main @ 218IS U/1 -65f Elr&Mie-y- M a7z,'W of tkO
edge of paving in 73vd Ave.W; extend main M'S to reeve target..
Contractor: PUGET SOUND ENERGY Contact: DOUG USITAEA)
1122.75th St SW Everett, 982%one: (425) 356-7520
Mailing Address: .. 11
4
State License #: F t - Liability Insurance: Bond:$
D. Building Permit # (if applicable):
Side Sewer Permit # (if applicable):
E. Commercial Subdivision El ;eity"*rbject F Utility (PUD, GTE, W&G,`�'CXB�E, WATER)
Multi -Family E] Single Family FJ O�h*
er,
INSPECTOR:' 114SPECTOR:
F. Pavement or Concrete Cut: 0 Yes [NNo G. Size of Cut: — x H. Chargq_$
APPLICANT TO READ AND SIGN
INDEMNITY: Applicant understands and by his signature to this application to hold the City ofEdmonds harmlessftom injuries, damages, or claims ofany
kind or. description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds, 'or any of its departments or
employees, including or not limited to the defense of any legal proceedings including. defense costs and allorneyfees by reason of granting this permit.
THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL INSPEC-
TION AND ACCEPTANCE OF THE WORK. ESTIMATED RESTORATION FEES WILL BE HELD UNTIL THE FINAL STREETPATCHIS COMPLETED
BY CITY FORCES, AT WHICH TIME A DEBIT OR CREDIT WILL BE PROCESSED FOR ISSUANCE TO THE APPLICANT
Two gets of construction drawings of proposed w ork required with permit application.
A 24 hour notice is requiredfor inspection. Please call the Engineering Division, 771-0220.
Work and material is to be inspected during progress and at completion..
Restoration is to be in accordance with City Codes,
Street shall be kept clean at all times.
Traffic Control and Public Safety shall be in accordance with City -regulations as required by the City Engineer.
All street cut trench work shall be patched with asphalt or City approved material prior to the end of the 'working day;
NO EXCEPTIONS.
I have read the above statements and understand the permit requirements'�md . the pink copy of the permit will be
available on site at all times for inspection purposes.
Signature:.
d4" 14, 14�-IV I Date: 3/z4/V!0
(Contractor br Agent) PEEM El - LCEM-FUUG1W
CALL DIAL -A -DIG PRIOR TO BEGINNING WORK
FOR CITY USE ONLY
APPROVED BY�. RIGHT OF WAY FEE: //0.00
TIME AUTHORIZED: VOID AFTER 1 '10 DAYS DISRUPTION FEE/FUND I 11:
SPECIAL CONDITIONS: M A. -
RESTORATION FEE:
T OTAL FEE: 00
RECEIPT NO.:
ISSUED B)�'--
NO. WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE Eng. Div 1997
FIELD INSPECTION NOTES
I Comments:
I Diagram
(Fund 111 - Route copy to Street Dept.)
CONTRACTOR CALLED FOR INSPECTION El YES El NO
PartW Work Inspection by P.W.:
Work Disapproved By: Date:
FINAL APPROVAL BY: Date:
NOTES:
c 1--[— ;2 ID 13 -0 T
-EF'O 7Z _Y ID 110-
2. CITY OF EDMONDS:
Maintain a minimum of 5' horizontal
and 3' vertical clearance from all
city utilities and appurtenances.
Cuts in paving are shown as L 4:�A
I
_T1_ ----- cuts in paving anticipated.
Notify Engineering Division 24 hrs
i 1 11 1 1 prior to construction - 425-771-0220
1 331 3 1
3. PROJECT MANAGER: DOUG USITALO - 425-356-7520
SCALE: I"=50'
�?t4
ROPES AT EDGE OF PAVING
4
!241
0 [402
C1.1
C'J
0
C\?
co 216's-
00 1979
C12
TIE-IN 0 218'S 2'W EDGE PAV.
2" PE IP MAIN 2'W EDGE PAVING"�'
END MAIN 369'S
2' W EDGE PAV.—,".,�
1 —B 0 0 —.4 P_ 4� --f5 5 G cD_
DESCRIPTION DATE I BY I APF
REVISIONS
AS -MILT IWORMATION
FITTER OR CONTRACTOR I COMIMTOR
DATE COMPLETED % COMPLETED
INSTALLAWIMM
TYPE (IF 7M
"TE am TIME ON MAIN six MATERIAL TOTAL FOOTA
DATE OFF THE OFF
TYPE OF PIPE
PIPE HAWFACTIM
WTED BT
op wp 164.68
PUGET nAT mAP 166.70
SOUND
ENERGY ,.=NW-32-27N-0,
EMER160 SEC 0
PROPOSED mAiN FOOTAGE CUTS" rRESWRE
aw sizE I mmut. I TOTAL rwAK sum uw
2" 1 PE I 15U' I Pmas rnK4nNT)q
2" PE IP MAIN EXTENSION TO
SERVE: 23326 74 TH AVE W.