Loading...
23329 92ND AVE W.PDF11,1111111111 8840 23329 92ND AVE W ADDRESS: TAX ACCOUNT/PARCEL #: -1 BUILDING PERMIT (NEW STRUCTURE) COVENANTS (RECORDED) FOR: CRITICAL AREAS DETERMINATION: El Conditional Waiver Astudy Required E]Waiver CRITICAL AREAS DETERMINATION: Conditional Waiver El Study Required Waiver DISCRETIONARY PERMIT #S: DRAINAGE PLAN DATED: 10 PARKING AGREEMENTS DA�ED: EASEMENT(S) RECORD FOR! PERMITS (OTHER — list permit Vs): PLANNING DATA CHECKLIST DATED SCALED PLOT PLAN DATED: , 51uloz, SEWER LID FEE $: LID #: SHORT PLAT FILE: S - 22(a - trpsl LOT: I -FBLOCK- SIDE SEWER AS BUILT DATED: SIDE SEWER PERMIT(S) #: GEOTECH REPORT DATED: STREET USE/ENCROACHMENT PERMIT #: FOR: WATER METER TAP CARD DATED: OTHER: L:\TEMP\DST's\Forms\Jana's Street File Checklist 5-14-08.doc Ov E D'v STATUS: ISSUED 8/21/2008 Expiration Date: 8/21/2009 Parcel No: 00555300100505 RAY WEBER 24323 CEDAR WAY 0 0 CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS,WA 98020 PHONE: (425) 771-0220 - FAX: (425) 771-0221 Permit #: BLD200 �0141- Project Address: 23329 92ND AVE W, EDA6NI* RAY WEBER 24323 CEDAR WAY MOUNTLAKE TERRACE, WA 98043-5834 MOUNTLAKE TERRACE, WA 98043-5834 206-769-3860 RAY WEBER 24323 CEDAR WAY MOUNTLAKE TERRACE, WA 98043-5834 LICENSE #: WEBERS* 168DH EXP:2/20/2010 JOB DESCRIPTION SFR VALUATION: $300,935 PERMIT TYPE: Residential PERMIT GROUP: 64 - Single Family Residence New GRADING: Y CYDS: 324 TYPE OF CONSTRUCTION: VB RETAINING WALL ROCKERY: N OCCUPANT GROUP: R3 OCCUPANT LOAD: FENCE: N ( 0 X 0 Fr.) CODE: 2006 OTHER: N ------- OTHER DESC: ZONE: RS-8 INUMBER OF STORIES: 2 —JVE ED DATE: INUMBER OF DWELLING UNITS: I I EXISTING AREA IBASEMENT: 0 1 ST FLOOR: 0 2ND FLOOR: 0 PROPOSEDAREA IBASEMENT: 0 1 ST FLOOR: 1428 2ND FLOOR: 1542 13RD FLOOR: 0 GARAGE. 0 DECK: 0 OTHER: 0 13RD FLOOR� 0 GARAGE: 576 DECK: 0 OTHER: 12 FRONT S ETBACK SIDESETBACK REAR S ETBACK �EQUIRED. (W) 25' PROPOSED: 25' �REQUIRED: (N) 7.5' PROPOSED: 17--�REQU`IRED: (E) 15' PROPOSED: 15' -lEIGHT ALLOWED:25 PROPOSED:23.2 IREQUIRED: (S) 7.5' PROPOSED: 7.5'+ 1 ;ETBACK NOTES: Southern side setback is measured to the northern boundary ofthe vehicular access easement. All rockeries/retaining walls must be ess than 3' over original grade where located Within the required setbacks. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATINGTO WORKMEN'S COMPENSATION INSURANCE AND RCW 18:27. [IS APPLICATION ISNO.T—A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL 0'R7ftJSfHAR DEPUTY AND ALL FEESARE FAID. I I - P le- �- 0 0 ?�K 60 P--,D /,- ff --D % ( Yd -//95( Signature Print Name Date 'fzet6ase�!`By' Date' I ATTENTION IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPEC11ON HAS BEEN MADE AND APPROVAL ORA CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC]09/ IBC I I G/ IRC 110, ARCHIVE APPLICANT = ASSESSOR OTHER 0 E7 STATUS: ISSUED BLD20080241 CONDITIONS : REQUIRED SPECIAL INSPECTIONS FOR THIS PROJECT: 1) Excavation, grading, & general site preparation 2) Soil bearing verification 3) Placement of structural fill & compaction 4) Foundation drainage • Lot line stakes must be in place at the time of foundation/setback inspection. • All new, extended, re -built or relocated electrical utility and/or service shall be placed underground. • Installation use and maintenance of equipment and components shall be per manufacturer's specifications, installation instructions, and applicable state codes. Provide manufacture's installation instructions on site for Building Inspector. • Installer shall provide the manufacturces installation, operating instructions, and a whole house ventilation system operation description. A label shall be affixed to the whole house timer control that reads "Whole House Ventilation" (see operating instructions). • Maximum Height 25 feet. Measured from average elevation of undisturbed sod at comers of extended building rectangle. Subject to field check by building department. • Hose Bibbs (exterior faucets) are required to have a permanently affixed anti -siphon device installed. • In addition to the required pressure/relief valve, an approved listed expansion tank shall be installed on all hot water tanks. Per UPC 608. • Type B or L vent connectors required on fuel-buming appliances passing through unheated spaces. Per IMC 803.2 • Obtain Electrical Pennit from State Department of Labor & Industries. 425-290-1309 • Pursuant to UPC 605.2 a water service shutoff shall be installed on the water line as it enters the building. • Gas pipe test must be observed by City Budding Inspector, affidavits shall not be accepted. • City approved plastic piping may be used in water service piping provided that where metal water service piping is used for electrical grounding purposes, replacement piping shall be of Re materials (UPC 604.8). A state electrical permit and inspection is required if electrical grounding is altered, removed, improved, or added. Contact State Dept. of Labor & Industries Electrical Division at 425-290-1309. • Subtnit all special inspection reports to the City Building Inspector on a weekly basis. • Any request for alternate design, modification, variance or other administrative deviation (hereinafter "variance") from adopted codes, ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable. Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision of city code or state law does not approve any items not to code specification. 0 Pursuant to UPC 608 a pressure regulator valve (PRV) shall be installed near the water shutoff. 9 Sound/Noise originating firomtemporary construction sites as a result of construction activity are exempt fromthe noise limits of ECC Chapter 5.30 only during the hours of 7:00amto 6:00pm on weekdays and 10:00am and 6:00pmon Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activites must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120, 0 Applicant, on behalf ofhis or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, aris ing directly or indirectly from the issuance fo this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance not limit in any way the City's ability to enforce any ordinance provision. 9 Refer to City of Edmonds Water service line handout for approved pipe materials, inspections and other requirements. 0 48 hours notice is required when requesting your FINAL Engineering Inspection. 425-771-0220, e)d. 1326. 0 New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly visible from the street or road fronting the property. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be legible from the public way, at least 4 inches high with a V2 inch min. stroke width on a contrasting background. 0 Call for locates of underground utilities prior to any excavation. 0 Maintain erosion & sedimentation control per city standards. 0 Maintain 10'seperation between the sanitary side sewer and the water service line. Applicant shall repair/replace all damage to utilities or frontage improvements in City fight -of -way per City standards that is caused by or occurs during the perrnitted project. I 1 0 0 THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT TIME LIMIT. SEE ECDC 19.00.005(A)(6) BUILDING (425) 771-0220 EXT. 1333 ENGINEUMG (425) 771-0220 lDcr. 1326 FWX (425) 771-0215 1 PUBLIC WORKS (425) 771 -M5 PR&TREATNMST (425) 672-5755 RECYCI-JNG (425) 2754801 _j When calling for an inspection please leave the folloming information: Permit Number, Job Site Address, Type of Inspection being requested, Contact Name and Phone Number, Date Prefereed, and %hether Von prefer morning or afternoon. I E-Erosion Control/Mobilization E-Traffic Control FStorinTightline E-Ston-n Connect to Stub EStortn Detention System E-Footing Drain Connection E-Water Service Line E-Driveway Fonn & Slope Ver. E-Engineering Final B-Setbacks B-Footings B-Foundation Wall B-Isolated Footings/Piers B-Slab Insulation B-Plumb Ground Work • B-Plunib Rough In • B-Gas Test/Pipe B-EAefior Sheathing B-ShearNailing B-Height Verification B-Frarning B-Wall Insulation/Caulk B-Cciffig Insulation/Caulk B-Shectrock Nail B-Building Final c- W &,)a t (;� � x . .,57; --;'- 00'? - jtj 14f�cal A T�p �aqf 9-7-yf\ 3 97- ejec-ced 3"d 7 %/ Or,, N rl?/, - -CAJ �-Tlf �41-lc 6-� /I r III I if Y "_ e al 0, ?4, *Aa, '9',9 -2 2 9 9.1 C. Top Fro w 49 &A I)> 9w?. 9 1 nt rij;Ad. TREET FIL av I Sides Wt 4kyl so+ C) .90Q�J,�6 t;�- - 7e Front W T. p 4-10, Side S sW lot t Rear 0 1 . - 0, 0 DA!q 0&ftl4f. t e 0 N �SJA 91 Other F, Tp/b He�ight t3d7a,- 0 t p 14,1A, T To I A 3 92. ��2 0 L10 9 1 10 :0 1 a 398. op 0. sro —. J u re D,� -94 ID "I ev le 'v C-)(( Ilk a cx cl 33 af-&j C- 0 VL-VI d,� e c- io e all e- ,ow jj 10 fy; 'a A\ 11W CPO- S. A S �/�Irdly C zioms.;. D I ST -F. Li —I /SE f,�dt" our- 0 5.f Awas ") , ;CA ^1 c AT-5 r. v e- 30 TO 0,1 JA P1 eA T -,OPtA - Y 1) e-7 e A 7 "o i% c 'y 4,10 3. � 7 Nf 0 65P4 1 T 0 Dt, Ov 61 93o s-F, To AN 'A 5 er v; IS k cj 0 slop- Apg�;MJVED'IOOTED 6 To A e BY ENGINEERING a v t.,j FOR �MSPECTIGN %OL!�3 6UX66 1>,'qc APPROVED BY PLANN46 Y\U;A F) c RESUB 3 99. Rydak%7- rk - F.-o�7 ALL EXPOSED SURFACES TO MAY 2 0 2008 BE COVERED WITHIN 2 DAYS B%1pYNQ ORWCr,"6�, 0 0 PLANNING DATA STREET FILE SINGLE FAMILY RESIDENTIAL Name: Date: /0 Site Address: cla nct \J Plan Check # - I Project Description: N e-Lo e Reduced Site Plan ProvidedALES NO) Zoning: Map Page: Corner Lot: (YES Flag Lot:' YES Critical Areas Determination it: CPA-3(DQG- \Ga A Study Required — Ecarb'zbr, El Waiver SEPA Determination: 1�-xexvNc�r Exempt X Needed (for over 500 cubic yards of grading) 0 Fee El Checklist El APO List with notarized form Required cks Street: e: Rear: kl� 7:7. S' Actual Setbacks Street: Side- 61� 16 tSide:( Rear El Detached Structures: Rockeries - El Fences/Ti-ellises:';�C)'r%es\lot;o". 310,4tr AV --)-&k-e. -Vo \3p— ke---zA. J4 Bay Windows/Projecting Modulation: Upfer -01oor c,*e-41\,tvex- or-, 6-4�ltk- 15�% E- El Stairs/Deck: Alo, , SV0j,-,-, A1A\0 '% n cn-e��Cr Sncc.>,-% -k-o Datum Point: -Vo-c) CP 2)%. Cr1�"n\-e,-C41VAU-- Datum Elevation: N Maximum Height Allowed: Actual Height: 2 a -�) I ( other Parking Required: Parking Provided: Lot Area: Maximum Lot Coverage: 35% upropo�� Lot Coverage Calculations: Ree:�,Aep- 00V 0 aoree- -V�r- 6A ADU Created: (YES As Subdivision: !�:; — or.. - i L-crV J Legal Nonconforming Land Use Determination Issued: (YES Coairuents Plan Review By: fl"4iq Data form 04-11 -W, doc AT: DE PER-INTERNATIC W__ Occupancy established by this certificate: No. Stories:— 2 Owner of building: kR-t—MENT'OF BUILDIN.GS AL RESIDENTIAL CODE,SECTION R110 A" Building P , e rm it M BLD2008-0241 Dwelling Units: Basement: N/A Type of Construction: V13 RaVMeaber,,.­,!1 R3 nd-Ave,W ""beeriA' The Single Family Residence at 23329'92 has- nspected and approved complying with the requirements of the 2006 edition of the International Residential 6de as ad olpte�d"by-,_t hircit-y-f�o---r!.tzt�i-6-,,,group and division of occupancy and the use for which the proposed occupancy is classified. Issued this 6 th day of August, 2010 -Chief Building Official By: Any change of occupancy or use requires a building permit and a new Certificate of Occupancy issued by the City of Edmonds Building Official. NOTICE. _7U c No"'W''a r-r a n t� y a t'o n shown on the attached The inforM I map(s) was compiled for. use by the City Of Edmonds/ its Empl-oyees and Consultants. Th,.e City of �Edrn.onds does. not . warrant the f anything set forth on these accuracy 0 M a P ('s"). A n . y person or entity -requesting a copy should c:onduct an independent 'ation shown-o inquiry regarding the inf('Drm tFi�� map(s),, including, but not hrn'ted to, the location of any sewer stub shown, Suc -not exist and may sewer stubs may or may or may not exist at the location shown Neitheir the City of Edmonr-14 S nor its e m pt o-y e e-s o r o ff i -c e -r s -s h. b e I--,, a. Iralf-e f o r h n on this map(5), nor for information g'Ve' d entation provided base any one repres upon said. map(s). STREE FIL, �.�4 c �13 �.3 C-G TE 31900 391 Ap 7- S T4, D,5 ez"Imp 03kT1,.#\ r- qq, S.F. 7-v 15e-w- r-.%" , A CW Foe 0 /, I' V e- 9 3 D 5, P , r44TO 29 / 8 "Pi pe- (--) �qew C-B- ,j V- u at —;-- F I J)ry,f AIX ()UJY%r-O �,r;s or- Pc, 0 , T 4�64 r -of y 2'372-� jfkppl- nt hall ��repVce all damage to utillt .1 or ntage ImPrOvGments in City sed I gM#w y per City standards that is cau rjht r or oc4rs uring the pwmitt8d Pr0J9ct* v jA, (LCCS -r* ive- 10 L6 e( q,30 s-f 0 4o L F00TjjVG DF141AIS IVO-r To Bc T, D DETEIVildkE . SYIAITO <, 0, STEAf 9.2 0 4!!�Ave- id, qftAor OLVU, A�VROVFID AS NOTED 6ovev, �9�1 c "2. WA%ISWE� PIC mjEW AY XEIN EIRING �0- 31 DISMEr RESUB '* - 2 0 2008 PIAV� 111WSWAMAWqr STANDARD DETENTION SYSTEM WORKSHEET (5000 SF OR LESS) CALC. BY: OWNER- ADDRESS: 921A J CA PHONE: Z 2- E *� 3� DATE: ORIFICE IMPERVIOUS SUFACE AREA PIPE DIA. PIPE LENGTH RIM ELEV. FINIAW GRAqW TIG FOOTING DRAINS SHALL NOT DETENTION PIPE LENGTH — 0.5% TO 1.0% SLOPE . E LEV. 11A —.0 BE CONNECTED TO OCKING LID (TYP-) _ IM ELEV. I 9->1 0 0 F61, min. clearance Measured from top of Conc. box or riser. DETENTION SYSTEM ,(-/ /,/ �Tu b TO CITY CONVEYANCE INV. '� �/ ELEV. 0 yo RIM ELEV IKI%l r-1 C%J ONTROL UPPER CATCH BASIN -F 9* IN, RIFICE ROM CONTROL CB 2 2'X2'XI 2" DEEP (4'-6- QUARRY SPALLS OR EQUAL) CONTROL CATCH BASIN IN. 6" COVER FROM CONTROL C ROM CONTROL CB 12" DEEP (4 QUARRY SPALLS IN, 6"1 CONTROLCEI S R SHALL BE PERPENDICULAR H T TO SPREADER TRENCH RENCH SHALL BE LINED WITH MIRAF1 & ON TOP L PERF. PIPE SHALL BE L L E ENDS EVEL & CAPPED AT 7/8" WASHED DRAIN ROCK RIPRAP OUTLET SPREADERTRENCH NOTES 1, CALL ENGINEERING DIVISION (771-0220 EXT. 1326) 24 HOURS IN ADVANCE FOR A TIGHTLINE AND DETENTION SYSTEM INSPECTION BEFORE BACKFILLING AND FOR FINAL INSPECTIONS. 2. Responsibility for operation and maintenance of drainage systems on private property is the responsibility of the property I * owner. Material accumulated in the storage pipe must be flushed out and removed from catch basins to allow proper operation. The outlet control orifice must be kept open at all times. CITY STORM CONVEYANCE SYSTEM SPREADER TRENCH SHALL BE A MIN. OF 10'LONG AND PERPENDICULAR TO CONTROL CB. 1-1 WEBER SHORT PLAT 7. DRAINAGE CALCULATIONS Total Area of the Site 0.694 Acres As per the Soil Survey of the Snohomish County Area, the entire site is Alderwood Gravelly Sandy Loam, which corresponds to a Type C soil. For calculation purposes, a Type "C" soil was used. 10,34-MR000, MI , Impervious Area: Existing House 2,334 sf. Concrete Patio 836 sf. . Total 3,170 sf (0.073 Ac.) Pervious Area: Area = 0.694 (total) — 0.073(imp.) = 0.621 Ac. CN = 81 Tc = 16.99 minutes L = 85 feet S = 7.29% Developed Site: Impervious area: Onsite Area: Shared Driveway = 2,031 sf. 6 4 F Lot 1 house = 2,400 sf. ot I driveway 8� a7- &p Lot 2 Driveway 900 Sf. Lot 3 house = 2,400 sf. Lot 3 DriveMaA = 1.000 Sf. Total . = 9,581 sf. (0.220 Ac.) Pervious area: 0.694 (total) — 0.220 (imp.) = 0.474 Ac. *Rainf�ll 2- Year = 1.50 in.: 10- Year = 2.00 in.: 100- Year = 3.00 in. Taken from the City of Edmonds required rainfall totals WESTERN ENGINEERS, INC. PROJECT: 06-774-A NW CORNEI LOT 6 291 se rt s—, 1,00 to 130, jo. ra CY--L(-1'6-1(T-E= 337,47' WESTERLY 231.56' -------------- ------------- 0- N88'03'40"E (P)' A881041081E (WEI) 2JI.56' (WEI) 75.75' ---- ----- 11604 -J9.77' GE., a av r� sit 60 10, STORM -392 2. & UnUTY E4SEMENT 0 12,268 !:;F to (�-'282 ACkES) 10T 2 NkT ! 10,295 9,885 SF K to If k S;5.1. Co 0236 ACRES) tu---ZI AE&Lb) z %'-k .. .. . 0 LOT-:, V MET WACRES)nj DiWNAGE �X*/v fit EASOJENT ir pfA ESWr yr8,�V-- . - v-8 t )f r\ 31 It 0 j It TTIM Vt rCA-#'r 1 42.70 %n w 4o' /I FND IP CRIMPED, DOWN 1.7, 0.2N. O.11fit�i� (11106) NW04'OXE WO) 23' ACCESS NBIrOJ'401- P) - ESHT tj r% 'o cb /. tr 7:-- , 3 0( L231.56' 23' ACCESS ESUT tn 8,064 SF- (0. 185 ACRES) 6 5.5' OF LOT 5 70-03' VEI) c Fsl� c, �j c�332-7 RECEIVED JUN 19 2008 ENGINEEFUNG DIVISION SOUTI NORD FND 112- R1, 116915" ON i COR OF 36" 1 (11106) ""W —tl NOW F7VD 112 - R/I LS 116915" D (11106) IF I 9 Western e Engineers IV" Inc. SURVEYORS - PLANNERS - ENGINEERS PREPARED BY: JESSE JARRELL, E.I.T. REVIEWED BY: BARRY CONSTANT, P.E 13000 Highway 99 South * Everett, Washington 98204 (425) 356-2700 FULL STORM DRAINAGE STUDY For WEBER SHORT PLAT 23327 — 92ND AVE W. EDMONDS, WASHINGTON S-2006-152 ISSUE DATE: JUNE 28,2007 REVISION DATE: August 21, 2007 CLIENT: RAY WEBER 24323 CEDAR WAY MOUNTLAKE TERRACE, WA 98043 (206) 769-3860 FAX (425) 356-2708 )6a"O�q I REET FILE RECEIVED MAR 21 Ka3 BUILDING DEPAk CITY OF EDMom),Q WESTERN ENGINEERS, INC. Job No. 06-774-A LAND USE CONSULTANTS - CIVIL ENGINEERS - LAND SURVEYORS - ENGINEERING CORPORATION 0 1 . 0 TABLE OF CONTENTS Page Drainage Information Summary ..................... .... .................................... I ExecutiveSummary ........................................................................................... 2-4 ExistingConditions ............................................................................................ 5 OffsiteAnalysis .................................................................................................. 6 Aerial and Downstream Photographs ............................................................... 7-11 DrainageProposal .............................................................................................. 12 Drainage Calculations ........................................................................................ 13-19 Erosion/Siltation Risk Assessment ................................................................... 20 SoilsData ............................................................................................................. 21-27 Operations and Maintenance .............................................................................. 28-36 WEBER S14ORT PLAT 1. ATTACHMENT ssA99 DRAINAGE INFORMATION SUMMARY FORM Project Name: WEBER SHORT PLAT Project Engineer: WESTERN ENGINEERS, INC. Project Applicant: RAY WEBER EMOUNTLAKE TERRACE, WA Project Total Area: 0.70 Acres Project Development Area: 0.70 Acre Summary Table Number of Existing Lots: 1 Number of Proposed Lots: 3 Drainage Basin Information Individual Basin Designation TOTAL A B C On -site Development Area 0.70 ac Type of Storage Proposed PIPE Approximate Storage Volume 547 sf. Soil types ALDERWOOD Type C t-re-aeveiopea Kunorr mare Q (cfs) 10 year 0.076 100 year 0.181 i-osr-aevetopea munort mate Before / after controlling Q (cfs) 10 year 0.161F0.076 100 year 0.29710.181 WESTERN ENGINEERS, INC. PROJECT- 06-774-A WEBERSHORTPLAT 0 1 1 0 2. EXECUTIVE SUMMARY The proposed project is located at 23327 92 d Ave West in the City of Edmonds, Washington. More generally, the site is located in Section 3 1, Township 27 North, and Range 4 East of the Willamette Meridian in Snohomish County, Washington. Please refer to the Vicinity Map attached in the next section. The approximate 0.70-acre site is partially developed with a house, detached garage, an asphalt driveway and a gravel driveway. The site generally slopes towards the west towards 92 nd Ave, at slopes ranging from 2% to 50%. The majority of the site is covered by poorly maintained residential landscaping and lawn area. Small areas of the site located along the southern, northern and eastern boundaries exist as second/third growth forest. The site contains Alderwood type soils. Please refer to the soil map and descriptions attached later in this report. The planned development for the site includes the retaining the existing residence and the addition 2 new single-family lots along the eastern and western boundaries. The proposed development would include a 23-foot wide shared driveway easement which will be used by lots 2 and 3 of the short plat. Lot 1, located along the western boundary line of the site, will utilize the existing access point into the site. Both driveway entrances will gain the site access to 92 d Ave West. Storm water detention for the site will be performed through an underground detention pipe located in the center of the 15-foot drainage easement, located on the western boundary line of lot 2. The 64-foot long, 36" diameter detention pipe will detain the majority of the runoff from the site and convey it to the storm system on the eastern side of 92 d Ave. The design of the underground detention pipe is proposed to meet the detention requirements conforming to the City of Edmonds and the 1992 D.O.E. Ston-n Water Manual. Sewer service will be provided from an existing sanitary sewer main located in the right- of-way for 92 nd Ave. The development will retain the existing sewer stub for the existing house on site and lengthen the side sewer to serve lots 2 and 3. From the western boundary line of the site, the existing sewer stub will be connected with a new 6"pvc WESTERN ENGINEERS, INC. PROJECT� 06-774-A Z WEBER SHORT PLAT side sewer which will travel southeast into the shared driveway easement and then east towards lot 3. A sewer cleanouts are to be installed after each new stub out and bend in the side sewer. Water service will also be provided from Serene Way through 2 new water meters located at the northwest side of the intersection of 92 d Ave and the shared driveway. The 2 new water meters will service the existing house and lot 3 of the short plat. The existing water meter for the site is to be retained and redirected to lot 1. All other utilities (power, cable, gas ... ) will also be located along the north side of the of the 23-foot wide shared driveway easement through a I 0-foor utility easement. An additional I 0-foot utility easement is to be located along the frontage of the site to give lot I utility service. WESTERN ENGINEERS, INC. PROJECT: 06-774-A 13 0 1 . 0 VICINITY MAP PHOTO TAKEN FROM THE 1998 THOMAS BROTHERSO GUIDE CD-ROM Western ngineers -Inc. SURVEYORS PLANNERS - ENGINEERS 13000 Hwy 99 South, Everett, WA 98204 (425) 356-2700 + (425) 356-2708 (FAX) E-mail: wei.inc@gte.net WEBERSHORTPLAT EDMONDS, WA 98020 SCALE: DATE- 6/28/07 CIMCKED: BRC l" = 1,222' JOB NUMBER: FILE NAME: BY: JAJ I 06-774-A 06774NICTNITYMAPb R WEBER SHORT PLAT 3. EXISTING CONDITIONS The approximate 0.70-acre site is partially developed with an existing house, garage, gravel driveway and an asphalt driveway. Slopes on site are mild to steep. The steep slopes exist along the northern and southern boundaries of the site. These slopes range 25% to 50% and slope down towards the central area of the site. The eastern, central and western areas of the site are moderately flat and range from 2% to 25%. Drainage flows from the south, north and eastern area of the site (sheet flow) travel towards the central area of the site. From the central area of the site the flows turn west and heads towards the existing drainage system on the south side of 92 d Ave. The site contains Alderwood type soils. Please refer to the soil map and descriptions attached later in this report. WESTERN ENGINEERS, INC. PROJECT: 06-774-A 61 WEBER SHORT PLAT 0 0 4. OFFSITE ANALYSIS A site reconnaissance was done by Jesse Jarrell, E.I.T. of Western Engineers Inc. on June 28, 2007 to verify the downstream flow paths. The weather was partly rainy with a temperature around 65 degrees. The site is mostly developed with an existing single-family residence, an asphalt driveway, gravel driveway, a detached garage and a gravel driveway. residential landscaping surrounds the eastern side of the site with areas of second/third growth forest around its perimeter. The majority. of the site slopes towards the west into 92 d Avenue at slopes ranging from 2% to 50%. A: Upstream Analysis Upstream flows into the site primarily consist of minor sheet flow from the neighboring properties to the north and south. The flows travel towards the central area of the site where they eventually turn west and heads towards 92 d Ave. The upstream flows into the site, from the neighboring properties to the north and south, are minor and can be ignored. B: Downstream Analysis Please refer to the Downstream Analysis Map attached in the next page for a detailed description of the downstream drainage course. From the surrounding topography, and topographic aerial maps, it appears that all of the runoff from the site travels to the central area of the site and then west towards 92 d Ave (refer to photo I for reference). The flow then enters into the existing storm conveyance on the east side of 92 nd Ave where it turns north and continues along the east side of the road (refer to photo 2 for reference). The flow continues along the east side of the road, through numerous open and closed ditch line, where it eventually reaches the southeast side of the intersection of 92 nd Ave and 232 d Street (refer to photo 3 and 4 for reference). As the flow from 92 nd Ave reaches 232 nd Street, the flow turns east and heads down the south side of 232 nd Street. The flow continues east, for approximately 60-feet, where it turns north and heads towards the northwest side of the intersection of 232 nd Street and Edmonds Way (refer to photo 6 for reference). The flow then enters into the existing storm conveyance system, on the southwest side of Edmonds Way, and continues northwest along the road. The flow continues along this path for approximately another 200-feet where it reaches approximately 1/4of a mile away from the site. No visible drainage problems were observed at the time of field inspection. Refer to the following pages for Downstream Analysis Map, Aerial Basin Map and USGS Map. WESTERN ENGINEERS, INC. PROJECT: 06-774-A 9 WEBER SHORT PLAT 0 5. AERIAL AND DOWNSTREAM PHOTOS WESTERN ENGWEERS, fNC. PROJECT: 06-774-A 17 0 1 1 0 AERIAL AND DOWNSTREAM MAP TAKEN FROM TBE USGS TERRA SERVER WEB SITE Western Engineers 6R'4_Inc. SURVEYORS - PLANNERS - ENGINEERS 13000 Hwy 99 South, Everett, WA 98204 (425) 356-2700 + (425) 356-2708 (FAX) E-mail: wei.inc@gte.net WEBERSHORTPLAT EDMONDS, WA 98020 SCALE: None I DATE: 6/28/07 1 CHECKED: BRC BY: JAJ I JOB NUMBER: I FfLE NAME: 06-774-A Aerial Map ®R 11 DOWNSTREAM PHOTOGRAPHS PHOTO 2: Figure to the Right: Looking north at the flow down the east side of 92 d Ave entering into a culvert located approximately 100- feet north of the site. Western - Engineers 06-' Inc. SURVEYORS - PLANNERS - ENGINEERS 13000 Hwy 99 South, Everett, WA 98204 (425) 356-2700+ (425) 356-2708 (FAX) E-mail: wei.inc@gte.net PHOTO 1: Figure to the Left: Looking north along the east side of 92 rid Ave from the existing driveway entrance into the site. Weber Short Plat Edmonds, WA 98020 SCALE: None DATE: 6/2 8/07 1 SHEET: I OF/-3 BY: JAJ JOB NUMBE FILE NAME: 06-774- D.S.PHOTOSDOC N DOWNSTREAM PHOTOGRAPHS PHOTO 4: Figure to the Right: Looking east from photo 3. Western Engineers ��' Inc. SURVEYORS - PLANNERS - ENGINEERS 13000 Hwy 99 South, Everett, WA 98204 (425) 356-2700+ (425) 356-2708 (FAX) E-mail: wei.inc@gte.net PHOTO 3: Figure to the Left: Looking north at the southeast side of the intersection of 92 nd Ave and 232 "d Street. Weber Short Plat Edmonds, WA 98020 SCALE: None DATE: 6/28/07 SHEET: 2 OF/ 2 BY: JAJ J07NUMBER: FILE NAME: I 06-774-A D.S.PHOTOSDOC /0 DOWNSTREAM PHOTOGRAPHS PHOTO 6: Figure to the Right: Looking northwest at a catch basin located at the northwest side of the intersection of 232 d Street and Edmonds Way. Western Engineers &�i Inc. SURVEYORS - PLANNERS - ENGINEERS 13000 Hwy 99 South, Everett, WA 98204 (425) 356-2700+ (425) 356-2708 (FAX) E-mail: wei.ineaetexet PHOTO 5: Figure to the Left: Looking east at the catch basin located in the background of photo 4 Weber Short Plat Edmonds, WA 98020 SCALE: None DATE: 6/28/07 SHEET: 3 OF /,3 BY: JAJ JOB NUMBER: FILE NAME: I 06-774-A I D.S.PHOTOS.DOC I/ WEBER SHORT PLAT 0 0 6. DRAINAGE PROPOSAL The proposed development for the site includes retaining the existing house on site and adding 2 new lots in the eastern and western areas of the site. Access for lots 2 and 3 will be from a 23-foot shared driveway easement located along the southern boundary line of the site. Access for lot I will be from the existing driveway entrance to the site from 92 "d Ave. The undeveloped and developed runoff for this project was calculated for the 10 and 100 year design storms using the Santa Barbara Unit Hydrograph method. The computer program used to compute the undeveloped and developed runoffs is titled Waterworks by Engenious Systems, Inc. The Stream bank Erosion Control detention release standard as defined by the Washington State Department of Ecology in the " 1992 Stormwater Design Manual for the Puget Sound Basin" was utilized to size the detention facilities. The undeveloped flows for the 10 and 100 year storms correspond to values of 0.076 and 0. 181 cfs. respectfully. The developed flows from the site, prior to storm detention, correspond to values of 0. 161 and 0.297 cfs respectfully. Detention for the site will be provided through 64 linear feet of 36" diameter underground detention pipe. The underground detention pipe has been sized to include a total required storage value of 506 cubic feet. The 64-foot long detention pipe has been designed for an approximate maximum volume of 547 cubic feet. This is larger than the required volume of 506 cubic feet. The detention pipe will receive the majority of driveway and roof drain runoff from the site where it will be detained and released at the undeveloped rates. The detention pipe will be located along the western boundary line of lot 2 in the center of a 15-foot drainage easement. The runoff 'will be detained and released at appropriate undeveloped runoff rates (I 0-year and the I 00-year undeveloped basin values). The pipe will release the runoff to the west and into the storm conveyance system along the eastern side of 92 d Ave. From there the flow will travel north along the eastern side of 92"d Ave along its natural drainage path. WESTERN ENGfNEERS, INC. PROJECT: 06-774-A 0 . 1 0 WEBERSHORTPLAT 7. DRAINAGE CALCULATIONS Total Area of the Site = 0.694 Acres As per the Soil Survey of the Snohomish County Area, the entire site is Alderwood Gravelly Sandy Loam, which corresponds to a Type C soil. For calculation purposes, a Type "C" soil was used. EXISTING SITE: Impervious Area: Existing House 2,334 sf, Concrete Patio 836 sf. Total 3,170 sf. (0.073 Ac.) Pervious Area: Area = 0.694 (total) — 0.073(imp.) = 0.621 Ac. CN = 81 Tc = 16.99 minutes L = 85 feet S = 7.29% Developed Site: Impervious area: Onsite Area: Shared Driveway = 2,031 sf. Lot I house = 2,400 sf. Lot I driveway 850 sf. Lot 2 Driveway 900 Sf. Lot 3 house = 2,400 sf. Lot 3 Driveway = 1,000 Sf. Total = 9,581 sf. (0.220 Ac.) Pervious area: 0.694 (total) — 0.220 (imp.) = 0.474 Ac. *Rainfall 2- Year = 1.50 in.: 10- Year = 2.00 in.: 100- Year = 3.00 in. Taken from the City of Edmonds required rainfall totals . WESTERN ENGWEERS, INC. PROJECT: 06-774-A /Y 8/21/07 2:55:10 pm. Western Surveyors Inc page 1 WEBER SHORT PLAT UNDEVELOPED BASIN BASIN SUMMARY BASIN ID: B010 NAME: 10 YEAR UNDEVELOPED SBUH METHODOLOGY TOTAL AREA ....... : 0.69 Acres BASEFLOWS: 0.00 cfs RAINFALL TYPE .... : TYPElA PERV PRECIPITATION .... : 2.00 inches AREA..: 0.62 Acres TIME INTERVAL .... : 10.00 min CN .... 81.00 TC .... 16.99 min ABSTRACTION COEFF: 0.20 TcReach - Sheet L: 85.00 ns:0.4000 p2yr: 1.40 s:0.0729 PEAK RATE: 0.08 cfs VOL: 0.04 Ac-ft TIME: 480 min BASIN ID: B100 NAME: 100 YEAR UNDEVELOPED SBUH METHODOLOGY TOTAL AREA ....... : 0.69 Acres BASEFLOWS: 0.00 cfs RAINFALL TYPE .... : TYPElA PERV PRECIPITATION .... : 3.00 inches AREA..: 0.62 Acres TIME INTERVAL .... : 10.00 min CN .... 81.00 TC .... 16.99 min ABSTRACTION COEFF: 0.20 TcReach - Sheet L: 85.00 ns:0.4000 p2yr: 1.40 s:0.0729 PEAK RATE: 0.18 cfs VOL: 0.08 Ac-ft TIME: 480 min IMP 0.07 Acres 98.00 10.00 min IMP 0.07 Acres 98.00 10.00 min 14 8/21/07 3:7:51 pm Western Surveyors Inc page 1 WEBER SHORT PLAT DEVELOPED BASIN BASIN SUMMARY BASIN ID: BDO10 NAME: 10 YEAR DEVELOPED SBUH METHODOLOGY TOTAL AREA ....... : 0.69 Acres BASEFLOWS: 0.00 cfs RAINFALL TYPE .... : TYPElA PERV IMP PRECIPITATION .... : 2.00 inches AREA..: 0.47 Acres 0.22 Acres TIME INTERVAL .... : 10.00 min CN .... 86.00 98.00 TC .... 10.00 min 10.00 min ABSTRACTION COEFF: 0.20 TcReach - Sheet L: 85.00 ns:0.4000 p2yr: 1.40 s:0.0729 PEAK RATE: 0.16 cfs VOL: 0.07 Ac-ft TIME: 480 min BASIN ID: BD100 NAME: 100 YEAR DEVELOPED SBUH METHODOLOGY TOTAL AREA ....... : 0.69 Acres BASEFLOWS: 0.00 cfs RAINFALL TYPE .... : TYPElA PERV IMP PRECIPITATION .... : 3.00 inches AREA..: 0.47 Acres 0.22 Acres TIME INTERVAL .... : 10.00 min CN .... 86.00 98.00 TC .... 10.00 min 10.00 min ABSTRACTION COEFF: 0.20 TcReach - Sheet L: 85.00 ns:0.4000 p2yr: 1.40 s:0.0729 PEAK RATE: 0.30 cfs VOL: 0.12 Ac-ft TIME: 480 min / �5 8/21/07 3:8:19 pm Western Surveyors Inc page 2 WEBER SHORT PLAT DRAINAGE CALCULATIONS STAGE STORAGE TABLE UNDERGROUND PIPE ID No. PIPE Description: UNDERGROUND PIPE Diameter: 3.00 ft. Length: 75.00 ft. Slope ... : 0.0050 ft/ft upstr: dnstr: STAGE < ---- STORAGE---- > STAGE < ---- STORAGE ---- > STAGE < ---- STORAGE---- > STAGE < ---- STORAGE---- > (ft) --- cf--- --AC-Ft- (ft) --- cf--- --AC-Ft- (ft) --- cf --- -- Ac-Ft- (ft) --- Cf --- -- AC-Ft- 391.00 0.0000 0.0000 391.90 98.038 0.0023 392.80 290.16 0.0067 393.70 471.71 0.0108 391.10 0.7230 0.0000 392.00 117.35 0.0027 392.90 312.35 0.0072 393.80 487.04 0.0112 391.20 4.0476 0.0001 392.10 137.48 0-0032 393.00 334.31 0.0077 393.90 500.47 0.0115 391.30 11.036 0.0003 392.20 158.26 0-0036 393.10 355.94 0.0082 394.00 511.03 0.0117 391.40 21.352 0.0005 392.30 179.57 0.0041 393.20 377.14 0.0087 394.10 521.25 0.0120 391.50 32.818 0.0008 392.40 201.30 0.0046 393.30 397.77 0.0091 394.20 527.25 0.0121 391.60 46.773 0.0011 392.50 223.33 0.0051 393.40 417.70 0.0096 394.30 529.80 0.0122 391.70 62.520 0.0014 392.60 245.55 0.0056 393.50 436.79 0.0100 394.40 530.15 0.0122 391.80 79.694 0.0018 392.70 267.86 0.0061 393.60 454.86 0.0104 394.50 530.15 0.0122 8/21/07 3:8:19 pm Western Surveyors Inc page 3 WEBER SHORT PLAT DRAINAGE CALCULATIONS STAGE DISCHARGE TABLE MULTIPLE ORIFICE ID No. OR Description: CONTROL STRUCTURE Outlet Elev: 391.00 Elev: 389.00 ft Orifice Diameter: 1.4795 in. Elev: 392.70 ft Orifice 2 Diameter: 1.6113 in. STAGE <--DISCHARGE --- > STAGE <--DISCHARGE --- > STAGE <--DISCHARGE --- > STAGE <--DISCHARGE --- > (ft) --- CfS -- ------- (ft) --- CfS -- ------- (ft) --- CfS -- ------- (ft) --- CfS -- ------- 391.00 0.0000 391.80 0.0531 392.60 0.0751 393.40 0.1510 391.10 0.0188 391.90 0.0564 392.70 0.0775 393.50 0.1569 391.20 0.0266 392.00 0.0594 392.80 0.1020 393.60 0.1626 391.30 0.0325 392.10 0.0623 392.90 0.1134 393.70 0.1681 391.40 0.0376 392.20 0.0651 393.00 0.1226 393.80 0.1733 391.50 0.0420 392.30 0.0677 393.10 0.1306 393.90 0.1783 391.60 0.0460 392.40 0.0703 393.20 0.1379 394.00 0.1832 391�70 0.0497 392.50 0.0727 393.30 0.1447 0 8/21/07 3:8:20 pm Western Surveyors Inc page 4 WEBER SHORT PLAT DRAINAGE CALCULATIONS LEVEL POOL TABLE SUMMARY MATCH INFLOW -STO- -DIS- <-PEAK-> STORAGE < -------- DESCRIPTION --------- > (cfs) (cfs) --id- --id- <-STAGE> id VOL (cf) 10 YEAR STORM ................ 0.08 0.16 PIPE OR 392.65 5 256.36 cf 100 YEAR STORM ............... 0.18 0.30 PIPE OR 393.95 6 506.11 Cf 'JO C_ Lq C-F_ 2_ . - �Sq tyi c,,r\ Ot -7 (0 Cf w"i 8/21/07 3:8:19 pm Western Surveyors Inc WEBER SHORT PLAT DRAINAGE CALCULATIONS HYDROGRAPH SUMMARY page 1 PEAK TIME VOLUME HYD RUNOFF OF OF Contrib NUM RATE PEAK HYDRO Area cfs min. cf\AcFt Acres 1 0.076 480 1833 cf 0.69 loyfl V,-N 2 0,181 480 3694 cf 0. 69 icOlf- 3 0.161 480 2878 cf 0. 69 iupr. 4 0.297 480 5071 cf 0.691"f. 5 0.076 540 2878 cf 0.69 /0-1(-. ae- L9 6 0.181 510 5073 cf 0 . 6 9 1 cx:�,qr. I# /7 WEBER SHORT PLAT 8. EROSION/SILTATION RISK ASSESSMENT The f6flowing assessment has been prepared in compliance with POL-3490(2) and in response to subsequent discussions with county -staff. Slope: THE SITE SLOPES 2% TO 50% FROM THE SOUTH, NORTH AND EAST TOWARDS CENTRAL AREA OF THE SITE. SLOPES FROM 2% TO 6% WEST, FROM CENTRAL AREA, TO 92" AVE. Critical Areas: NONE. Soils: ALDERWOOD TYPE SOILS, TYPE C. Ground Movement Potential: SITE APPEARS GEOLOGICALLY STABLE. Sources Of Water For Erosion: RAINFALL. Measures Proposed To Prevent/Minimize Erosion: During construction: PLANS REQUIRE STRAW BALE BARRIERS IN DITCHES, TEMPORARY CONSTRUCTION ENTRANCE, SEEDING/MULCHING AND FILTER FABRIC FENCE. Nearest Downstream Water Body Other Than Road Ditches: LAKE BALLANGER. SEE DRAINAGE REPORT Nearest Fish -Bearing Waters: LAKE BALLANGER Conclusion: POTENTIAL FOR SIGNIFICANT EROSION/SILTATION IMPACT ON OR OFF -SITE IS MODERATE FOR THE FOLLOWING REASONS: • THE MAJORITY OF THE AREA TO BE RE -GRADED AND CONSTRUCTED IS ON MILDLY SLOPING LAND. • FILTER FABRIC FENCE IS TO BE PLACED AROUND CONSTRUCTION AREAS. PROPOSED EROSION CONTROL BMPS IN COMPLIANCE WITH SNOHOMISH COUNTY GUIDELINES HAVE BEEN ENGINEERED FOR ANTICIPATED CONDITIONS. WESTERN ENGINEERS, fNC. PROJECT: 06-774-A M h WEBER SHORT PLAT 0 9. SOILS AND RAINFALL DATA WESTERN ENGMEERS, INC. PROJECT: 06-774-A Base maps are orthophotographs prepared by the State of Washington, Department of Natural Resources from 1973 and 1974 aerial photography. Coordinate grid ticks and land division corners, if shown, are approximately positioned t 290 000 FEET (joins sheet 56) T. 27 N. M ik* !a, a,, VA�I Irk ek Ut W73%.r -A 00 4;1 -d -7 ro --il KIT. 0 ..... Alt.0 L VI, A 'mom z 6 r14 Ln V 1W -my., A .......... ... I'll Cn 0 r- U) C M n 0 Area, Washington �, seasonal perched water table is at a depth of riches from January to March. and is areas that are covered by streets,�� -parking lots, and other structures th �bscure is n lot _s sl .b e soils so that identification I e. e ainly for fi� tes awns, gardens woodland. wo 1 e-'rwood soil in this unit is us I . �d g s ns ,4 1 itati 10 of the Ald lood soil for �,:nl� eptic'tank ab ption fields are the 6r n and seasonal perched water waste s al systems often fail or do not r6r erly dur enods of high rainfall. Drainage perly du .,,.if build' s Wit asements and crawl spaces � 6 1 Pcte . Topsoi e to be stockpiled during r n and subseque used to cover the Faterial. Additions of fe N­zer and peat are �s prior to seeding grass for ns. ip unit is in capability subclas lVe. erwood-Urban land complex, 8 to 15 percent 'his map unit is on till plains. Areas are irregular and are 25 to 100 acres in size. The native h is mainly conifers and hardwoods. Elevation is ).feet. The average annual precipitation is about the average annual air temperature is about es F, and the average frost -free season is 170 ;Unit is about 60 percent Alderwood gravelly sandy about 25 percent Urban land. The components ,unit are so intricately intermingled that it was not bil'to, map them separately at the scale used. in this unit are small areas of Everett and n. toils on terraces and outwash plains, Kitsap !--terraces and terrace escarpments, and Ragnar �.,,outwash plains. Included areas make up about cmint of the total acreage. Alderwood soil is moderately deep and ife'ly well drained. It formed in glacial till. Typically, f e layer is very dark grayish brown gravelly f6a*m about 7 inches thick. The upper part of the I -:.is dark yellowish brown and dark brown very V,sandy loam about 23 inches thick. The lower olive brown very gravelly sandy loam about 5 'thick. A weakly cemented hardpan is at a depth it 35 inches. Depth to the hardpan ranges from 0 inches. ipability of the Alderwood soil is moderately rapid the hardpan and very slow through it. Available ,apacity is low. Effective rooting depth is 20 to 40 ,,Runoff is slow, and the hazard of water erosion t., A seasonal perched water table is at a depth of 16 inches from January to March. in land consists of areas that are covered by ;�buildings, parking lots, and other structures that e or alter the soils so that identification is not i)d soil in this unit is used mainly for sites, lawns, and woodland. 13 The main limitations of the Alderwood soil for homesites and septic tank absorption fields are the depth to the hardpan and wetness because of the seasonal perched water table. Drainage is needed if buildings with basements and crawl spaces are constructed. Onsite sewage disposal systems often fail or do not function properly during periods of high rainfall. Topsoil needs to be stockpiled during site preparation and subsequently used to cover the exposed underlying material. Additions of fertilizer and peat are desirable prior to seeding grass for lawns. This. map unit is in capability subclass lVe. 7—Bellingham silty clay loam. This very deep, poorly ined soil is in depressional areas. It formed in all ium and lacustrine sediment. Areas are regular in sha and are about 2 to 25 acres in size. The native veget ion is mainly grass and sedges. Elevation is 5 o 800 fe Slope is 0 to 3 percent. The average annu precipita i n is about 45 inches, the average annua ir temperatu is about 50 degrees F, and the avera e frost -free s son is 160 to 180 days. Typically, t e surface layer is very dark gray ty clay loam about 9 1 ches thick * The subsoil to a d th of 60 inches or more mottled, gray and olive sil clay. Included in thi unit are small areas of T ric Medisaprists, very oorly drained organic ils Norma soils along upland rainageways, Kitsap nd Fastik soils on terraces, and Be *ngharn soils that ve been drained. Included are s make up abo 10 percent of the total acreage. Permeability of this B Ilingham s il is slow. Available water capacity is high. E ective r ting depth is limited by a seasonal high water ble at is at a depth of 0 to about 12 inches from Nov b to June. Runoff is very slow, and the hazard of wat erosion is slight. Ponding occurs from November to J This unit is used f?r,pas, re, woodland, urban nd w, ,,d, development, a if abit This unit is suited to sture i he excess water on the surface is removed. Ti drains or pen ditches can be used if suitable outle are availab . Grazing when the s soil in this unit is w results in com action of the com surface layer ' Poo tilth, and reduced Wiltration. Use of proper stocki , ng tes, pasture rotation, and restricted grazing during et periods helps to kee the pasture in good conditio . Proper grazing practices, weed control, and fertilizer re needed for'maximum qu ity of forage. This unit suited to red alder. On the b is of a 50- year site rve, the mean site index is 83. e mean 3r annual i rement at culmination (CMAI) f( r r alder at l a ge 40 th I e 40 s 89 cubic feet per acre. Among t e t es of imite extent on this unit are Douglas -fir, bigle maple, we rn redcedar, and western hemlock. Amon the co mon forest understory plants are trailing blac erry, stern swordfern, thimbleberry, salmonberry, an uckleberry. The main limitation for the harvesting of timber is il wetness, which limits the use of equipment to dry 23 CON TOPOGRAPHIC MAP MP ple oil, w ro 67 v ell PHOTO TAKEN FROM THE USGS TERRA SERVER WEB SITE Western Engineers WEBERSHORTPLAT 1�1 -Inc. EDMONDS, WA 98020 SURVEYORS - PLANNERS - ENGINEERS SCALE- DATE: 6/28/07 CHECKED: BRC 13000 Hwy 99 South, Everett, WA 98204 NON*E (425) 356-2700 + (425) 356-2708 (FAX) JOB NUMBER: FELE NAME: E-mail: wei.inc@gte.net BY: JAJ 06-774-A 06774AJTOPOMAPb .24 I 2 YEAR 24 HOUR ISOPLUVIAL MAP Taken From NOAA ATLAS 2, Volume IX, Figure 25 Western WEBERSHORTPLAT Engineers --Inc. EDMONDS, WA SURVEYORS - PLANNERS - ENGINEERS SCALE: DATE: 6/27/07 CHECKED: BRC 13000 Hwy 99 South, Everett, WA 98204 NONE (425) 356-2700+ (425) 356-2708 (FAX) JOB NUMBER: FILE NAME: E-Mmil: wei.inc*gte.net BY: JAJ 06-774-A 06774/2YR ISOPLUVIAL '2-5 10 YEAR 24 HOUR ISOPLUVIAL MAP 0, R PORT STAN L VE A N %%i L % EVE E TT 7 Z 25 jw E AT T Taken From NOAA ATLAS 2, Volume LX, Figure 27 Western n Ineers WEBER SHORT PLAT Inc. EDMONDS, WA SURVEYORS - PLANNERS - ENGINEERS SCALE: 13000 Hwy 99 South, Everett, WA 98204 NONE DATE: 6/27/07 CHECKED: BRC (425) 356-2700 + (425) 356-2708 (FAX) JOB NUMBER: FILE NAME: E-mail: wei.inc@gte.net BY: JAJ 06-774-A 06774/10YR ISOPLUVIAL 12 � F_;.M�p �_j 100 YEAR 24 HOUR ISOPLUVIAL MAP Taken From NOAA ATLAS 2, Volume IX, Figure 30 Western Engineers 7.1 -Inc. SURVEYORS - PLANNERS - ENGINEERS 13000 Hwy 99 South, Everett, WA 98204 (425) 356-2700 + (425) 356-2708 (FAX) E-mail: wei.inc@gte.net i X. WEBERSHORTPLAT EDMONDS, WA SCALE: DATE: 6/27/07 CHECKED: BRC NONE BY: JAJ JOB NUMIBER: FILE NAME: I 06-774-A 1 06774/1 OOYR I SOPLUVIAL 27 WEBER SHORT PLAT 0 10. OPERATIONS AND MAINTENANCE WESTERN ENGINEERS, INC. PROJECT: 06-774-A 2, cl No. 3 — Closed Detention Systems (Tanks/Vaults) Maintenance Component Defect Conditions When Maintenance is Needed . — Results Expected When Maintenance is Performed Storage Area Plugged Air Vents One-half of the cross section of a vent is Vents open and blocked at any point or the vent is damaged. functioning. Debris and Sediment Accumulated sediment depth exceeds 10% All sediment and of the diameter of the storage area for 1/2 debris removed from length of storage vault or any point depth storage area. exceeds 15% of diameter. (Example: 72-inch storage tank would require cleaning when sediment reaches depth of 7 inches for more than 1/2 length of tank.) Joints Between Tank/Pipe Section Any openings or voids allowing material to be transported into facility. All joint between tank/pipe sections (Will require engineering analysis to are sealed. determine structural stability). Tank Pipe Bent Out of Shape Any part of tank/pipe is bent out of shape Tank/pipe repaired or more than 10% of its design shape. (Review required by engineer to determine structural replaced to design. stability). Vault Structure Includes Cracks in Cracks wider than 1/2-inch and any evidence of soil particles entering the Vault replaced or Wall, Bottom, Damage to Frame structure through the cracks, or repaired to design specifications and is and/or Top Slab maintenance/inspection personnel determines that the vault is not structurally structurally sound. sound. Cracks wider than 1/2-inch at the joint of any No cracks more than inlet/outlet pipe or any evidence of soil 1/4-inch wide at the particles entering the vault through the walls. joint of the inletioutlet Manhole Cover Not in Place Cover is missing or only partially in place. pipe. Manhole is closed. Any open manhole requires maintenance. Locking Mechanism Not Working Mechanism cannot be opened by one — Mechanism opens maintenance person with proper tools. Bolts into frame have less than 1/2 inch of thread with proper tools. (may not apply to self-locking lids). Cover Difficult to Remove One maintenance person cannot remove lid Cover can be after applying normal lifting pressure. Intent is to keep cover from sealing off access to removed and maintenance. reinstalled by one maintenance person. Ladder Rungs Unsafe Ladder is unsafe due to missing rungs, Ladder meets design misalignment, not securely attached to standards. Allows structure wall, rust, or cracks. maintenance person safe access., Catch Basins See "Catch Basins (No. 5) See "Catch Basins" (No. 5). See ­�atch Basins" (No. 5). 4-34 Volume V — Runoff Treatment BMPs August 2001 ') 4q 06-/ F�_I L-A 0 No. 4 — Control Structure/Flow Restrictor Maintenance Component Defect Condition When Maintenance is Needed Results Expected When Maintenance is%Performed General Trash and Debris Material exceeds 25% of sump depth or 1 Control structure (includes Sediment) foot below orifice plate. orifice is not blocked. All trash and debris removed. Structural Damage Structure is not securely attached to Structure securely manhole wall. attached to wall and outlet pipe. Structure is not in upright position (allow up Structure in correct to 10% from plumb). position. Connections to outlet pipe are not watertight Connections to outlet and show signs of rust. pipe are water tight; structure repaired or replaced and works as designed. Any holes --other than designed holes —in the Structure has no structure. holes other than designed holes. Cleanout Gate Damaged or Missing Cleanout gate is not watertight or is missing. Gate is watertight and works as designed. Gate cannot be moved up and down by one Gate moves up and maintenance person. down easily and is watertight. Chain/rod leading to gate is missing or Chain is in place and damaged. works as designed. Gate is rusted over 50% of its surface area. Gate is repaired or replaced to meet design standards. Orifice Plate Damaged or Missing Control device is not working properly due to Plate is in place and missing, out of place, or bent orifice plate. works as designed. Obstructions Any trash, debris, sediment, or vegetation Plate is free of all blocking the plate. obstructions and works as designed. Overflow Pipe Obstructions Any trash or debris blocking (or having the Pipe is free of all potential of blocking) the overflow pipe. obstructions and works as designed, Manhole See "Closed See "Closed Detention Systems" (No. 3) See "Closed Detention Systems" (No. 3). Detention Systems" (No. 3). Catch Basin See "Catch Basins" See "Catch Basins" (No. 5). See "Catch Basins" (No. 5). (No. 5). August 2001 Volume V — Runoff Treatment BMPs 4-35 SAO No. 5 — Catch Basins Maintenance Component Defect Conditions When Maintenance is Needed — Results Expected When Maintenance is performed General Trash & Trash or debris which is located immediately No Trash or debris located Debris in front of the catch basin opening or is immediately in front of blocking inletting capacity of the basin by catch basin or on grate more than 10%. opening. Trash or debris (in the basin) that exceeds 60 No trash or debris in the percent of the sump depth as measured from catch basin. the bottom of basin to invert of the lowest pipe into or out of the basin, but in no case less than a minimum of six inches clearance from the.debris surface to the invert of the lowest pipe. Trash or debris in any inlet or outlet pipe Inlet and outlet pipes free blocking more than 1/3 of its height. of trash or debris. Dead animals or vegetation that could No dead animals or generate odors that could cause complaints vegetation present within or dangerous gases (e.g., methane). the catch basin. Sediment Sediment (in the basin) that exceeds 60 No sediment in the catch percent of the sump depth as measured from basin the bottom of basin to invert of the lowest pipe into or out of the basin, but in no case less than a minimum of 6 inches clearance from the sediment surface to the invert of the lowest pipe. Structure Damage to Top slab has holes larger than 2 square inches or cracks wider than 1/4 inch Top slab is free of holes Frame and/or and cracks. Top Slab (Intent is to make sure no material is running into basin). Frame not sifting flush on top s lab, i.e., Frame is sifting flush on separation of more than 3/4 inch of the frame from the top slab. Frame not securely the riser rings or top slab firmly attached and attached. Fractures or Cracksin Maintenance person judges that structure is Basin replaced or repaired Basin Walls/ unsound. to design standards. Bottom Grout fillet has separated or cracked wider Pipe is regrouted and than 1/2 inch and longer than 1 foot at the secure at basin wall. joint of any inlettoutlet pipe or any evidence of soil particles entering catch basin through cracks. Settlement/ Misalignment If failure of basin has created a safety, function, or design Basin replaced or repaired problem. to design standards. Vegetation Vegetation growing across and blocking more No vegetation blocking than 10% of the basin opening. opening to basin. Vegetation growing in inlet/outlet pipe joints No vegetation or root that is more than six inches tall and less than growth presen=t. six inches apart. 1.1V volume V — Hunoff Treatment BMPs August 2001 '31 No. 5 — Catch Basins Maintenance Defect Conditions When Maintenance is Needed Results Expected When Component Maintenance is performed Contamination See "Detention Ponds" (No. 1). No pollution present. and Pollution Catch Basin Cover Not in Cover is missing or only partially in place. Catch basin cover is Cover Place Any open catch basin requires maintenance. closed Locking Mechanism cannot be opened by one Mechanism opens with Mechanism maintenance person with proper tools. Bolts proper tools. Not Working into frame have less than 1/2 inch of thread. Cover Difficult One maintenance person cannot remove lid Cover can be removed by to Remove after applying normal lifting pressure. one maintenance person. (intent is keep cover from sealing off access to maintenance.) Ladder Ladder Rungs Ladder is unsafe due to missing rungs, not Ladder meets design Unsafe securely attached to basin wall, standards and allows misalignment, rust, cracks, or sharp edges. maintenance person safe access. Metal Grates (If Applicable) Grate opening Unsafe Grate with opening wider than 7/8 inch. Grate openin meets 9 design standards. Trash and Trash and debris that is blocking more than Grate free of trash and Debris 20% of grate surface inletting capacity. debris. Damaged or Grate missing or broken member(s) of the Grate* is in place and Missing. grate. . meets design standards. No. 6 — Debris Barriers (e.g., Trash Racks) Maintenance Defect Condition When Maintenance is Re sults Expected.When Components Needed Maintenance --is Performed General Trash and Trash or debris that is plugging more Barrier cleared to design flow Debris -&maged/ than 20% of the openings in the barrier. capacity. Metal Missing Bars are bent out of �shapemore than 3 inches. Bars in place with no bends more Bars. than 3/4 inch. Bars are missing or entire barrier Bars in place according to design. missing. Bars are loose and rust is causing 50% Barrier replaced or repaired to deterioration to any part of barrier. design standards. Inlet/Outlet Pipe Debris barrier missing or not attached to Barrier firmly attached to pipe pipe August 2001 Volume V — Runoff Treatment BMPs 4-37 Jz No. 18 — Catchbasin Inserts Maintenance Defect Conditions When Maintenance is Results Expected When Component Needle . d Maintenance is Performed General Sediment When sediment forms a cap over the No sediment cap on the insert Accumulation insert media of the insert and/or unit. media and its unit, Trash and Trash and debris accumulates on insert Trash and debris removed Debris unit creating a blockage/restriction. from insert unit. Runoff freely Accumulation flows into catch basin. Media Insert Not Effluent water from media insert has a Effluent water from media Removing Oil visible sheen. insert is free of oils and has no visible sheen. Media Insert Catch basin insert is saturated with water Remove and replace media Water Saturated and no longer has the capacity to insert absorb. Media Insert -Oil Media oil saturated due to petroleum spill Remove and replace media Saturated that drains into catch basin. insert. Media Insert Use Media has been used beyond the typical Remove and replace media at Beyond Normal Product Life average life of media insert product. regular intervals, depending on insert product. 4-50 Volume V —Runoff Treatment BMPs August 2001 _:;�s No. 15 — Stormfilter TM (leaf compost filter) Maintenance Component Defect Condition When Maintenance is Needed Results Expected When Maintenance is Performed Below Ground Vault Sediment Accumulation on Media. Sediment depth exceeds 0.25-inches. No sediment deposits which would impede permeability of the compost media. Sediment Accumulation in Vault Sediment depth exceeds 6-inches in first chamber. No sediment deposits in vault bottom of first chamber. Trash/Debris Accumulation Trash and debris accumulated on compost filter bed. Trash and debris removed from the compost filter bed� Sediment in Drain When drain pipes, clean -outs, become full with sediment and/or debris. Sediment and debris removed. Pipes/Clean- Outs Damaged Pipes Any part of the pipes that are crushed or damaged due to corrosion and/or Pipe repaired and/or replaced. settlement. Access Cover Damaged/Not Working Cover cannot be opened; one person cannot open the cover using normal lifting pressure, corrosion/deformation of Cover repaired to proper working specifications or replaced. cover. Vault Structure Includes Cracks in Wall, Bottom, Damage to Frame and/or Top Slab Cracks wider than 1/2-inch or evidence of soil particles entering the structure through the cracks, or maintenance/inspection personnel determine that the vault is not structurally sound. Vault replaced or repairs made so that vault meets design specifications and is structurally sound. Cracks wider than 1/2-inch at the joint of any inlet/outlet pipe or evidence of soil particles entering through the cracks. Vault repaired so that no cracks exist wider than 1/4-inch at the joint of the inlet/outlet pipe. Baffles Baffles corroding, cracking warping, and/or showing signs of failure as determined by maintenance/inspection Baffles repaired or replaced to specifications. person. Access Ladder Damaged Ladder is corroded or deteriorated, not functioning properly, not securely attached to structure wall, missing rungs, cracks, and misaligned. Ladder replaced or repaired and' meets specifications, and is safe to use as determined by inspection personnel. Below Ground Cartridge Type Compost Media Drawdown of water through the media takes longer than 1 hour, and/or overflow Media cartridges replaced. occurs frequently. Short Circuiting Flows do not properly enter filter cartridges. Filter cartridges replaced. August 2001 Volume V— Runoff Treatment BMPs 4-47 _K4 5FK PSE4 332 REE TA 56 eA et's Pee ji en, oll C.,� i 'Tf' c a D) � T, 1 r;r-1, / ref% -Soe,k a5pe-o o li 5,,ro' (A Cy�Tta c--i Ty - k � -7 A A ct V--c - W, 0 0 t7k ra 0 C,X;.57 J)"; V,- v%o-4 ,P,r ojo e 61dJ -fx� lei- c c 7-e A /A ' -JA C- d A 5 k (A 7 76 b v e P S, PIA.Sr,'e- CAA7,'/ 6,o,o e, e- .T e- e, � t noss cov'r D .�i 710 T; vi e- A OWNERICONTRACTOR IS RESPONSIBLE F(If EROSION CONTROL AND DRAINAGE RE , SUBZ"-eo51'oy\ COATral MAY 2 0 2008 p L&�OFWAONNY:)rS / -2 - Booz 0 / El/- 1 9 Ilb - 5 ,, �7 V sf,)PKC"2� .1 CtI4 vx J—P 2 -49 v WZ76 b6W7 V.2 4/0 "1 vole7 0 A )0 )"S N—V vi -7 i j f %4C6 �/�VP?7 Cl if PA NO IL— P- rl bll\ — - — I tee lilt f —,,Cc — I 1 Q,,'TbC 1 tO WV-,E/ a Ills 311A 133 0 -�&� 6 C I �71 5. ? o q, 5-,6( ru 1,10,2 mol --2 J.L' I-MIU � \1121\Cg daL .Yj 1-4 . a m �j 091,6c 4NO -N--cj,740 c, 0�� cv Go 1 11 CqIC6T d, ttlt do vA-7 I W\Olj j " J�v'OLI Ot 01, -4,1 , tsc wolLfcj 1 06 allil-i g 6 f ) v V.1. �P'l .4 O.,e 6 c AL , 5� . . . ... .. ..... -&1*46C *Ole-bE 16#be ------ I?r-7 >7 TO 0 ww"P5,0? X-3 Westem Geotedmical Consultants, Inc. 4183 Salt Springs Dr., Ferndale, WA 98248 Phone/FAX (360)380-2507 March 10, 2008 Ray Weber 24323 Cedar Way Mt. Lake Terrace, WA 98043 RE: Footing Foundation Support 2332792 nd Ave. West Edmonds, WA 98020 This letter report provides recommendations for foundation preparation for a home to be built at the above referenced property. The back of the property contains up to about 5 feet of uncontrolled fill which is underlain by hard native glacial till. We recommend that where foundations will be located, the area should be over -excavated to hard native soil. The area may then be backfilled with quarry spalls compacted in maximum 10 inch horizontal lifts. Each lift of spalls should be compacted to a dense non -yielding state using a hoepac or other approved compaction methods. Note that the excavation for the quarry spalls should extend beyond the edges of the footings by an amount equal to the depth of the over -excavation below the footing (excavate by D/2 on each side of the footing where D = the depth of the over -excavation). Where the excavation is deepest the width of the over -excavation can be -reduced by'deepening the footing provided the resulting excavation is wider than the footing by an amount equal to the depth of over - excavation below the base of the footing. At foundation level 6 inches of 3/4-inch minus crushed gravel leveling course should be placed and compacted. We appreciate the opportunity to be of service to you on this project. - If you have any questions regarding the contents of this report, or if we can be of further service, please contact our office. Sincerely, Western Geotechnical Consultants, Inc. Theodore A. Hammer, P.E. Geotechnical Engineer File: 07 26 3 "ON k I STR."AEET FILE RECEIVED MAR 2. 1 2008 BUILDING DEPARTMENT ClTy� OF EDMONDS