Loading...
23334 HIGHWAY 99.PDFiiiiiiiiiiiiii 14061 23334 HWY 99 RESUB 404 [-YP/Yf orthshore Traffic Consultants JUN 2 3 2008 3610 209th Place SE I"WNQ ENT 0 VJ- Bothell, Washington 98021 F%VO%N fti (206) 909-5222 May 23, 2008 CITY copy Mr. G. Patrick Morris ME@Martin, LLC 23723 112'h Place West Woodway, Washington 98020 Ph: (206) 542-4411 Cell: (206) 841-4400 Re: Traffic Study for Edmonds Retail Center Development in Edmonds, WA NTC Project No. 08TO2 Dear Mr. Morris: This letter report summarizes the traffic impact analysis conducted for the proposed Edmonds Retail Shopping Center development. The site of the proposed development is located on the northwest quadrant of the SR-99 and 234th Street SW intersection in Edmonds, Washington. This report addresses the traffic analysis conducted for the proposed development including trip generation and distribution, and mitigation requirements in accordance with the City of Edmonds Traffic Analysis Guidelines. Proposed Site Development and Access The proposed development will include the development and construction of approximately 16,930 square feet of retail floor area. The project site is currently a vacant lot. Access to the existing street system will be provided by a single site access driveway to SR-99 located approximately 160 feet north of the 234th Street SW. The project site is located on the west side of SR-99 directly north of 234th Street SW. The intersections of SR-99 and 234th Street SW and the proposed site access, are and will be unsignalized, respectively, with stop sign control on the minor approaches. Figure 1 shows the site vicinity of the proposed development within the local arterial street network. Figure 2 shows the proposed site plan for the proposed development. The planned completion and occupation of the project development is the horizon year 2009. Mr: G. Patrick Morris May 23, 2008 Page 2 EXISTING CONDITIONS Street System Primary access to the proposed development will occur along SR-99, a north -south, seven -lane principal arterial with a posted speed limit of 40 mph, carrying approximately 40,000 vehicles per day (vpd) in the project vicinity. State Route 99 provides local and regional access to communities located to the north and south of the project site. To the south of the project site is 234th Street SW, a two-lane east -west local access street with a posted speed limit of 25 mph that carries approximately 300 Vpd in the project vicinity. 234 1h Street SW serves as the primary connection to downtown Edmonds and vicinity and resideritial communities to the east. Located south of the project site is SR-104 and North 205 1h Street. Access to communities west of the project site is provided by SR-104, a five -lane east -west principal arterial with a posted speed limit of 40 mph that carries approximately 25,000 vpd in the project vicinity. North 20501 Street is an east -west secondary arterial that merges into SR- 104 east of SR-99, and serves as the primary connection to 1-5 to the south of the project site. TRAFFIC VOLUME FORECASTS Trip Generation Trip generation estimates for the proposed Edmonds Shopping Center were derived from trip generation rates published in the Institute of Transportation Engineers (ITE) Trip Generation Manual, 7th Edition, 2003, under Land Use Code 820 (Shopping Center) and the proposed square footage (16,930 SF) of the development. The trip generation analysis indicates that the proposed shopping center development will generate 727 gross daily trips of which 63 would occur during the p.m. peak hour. A pass -by reduction factor of 65 percent was applied to the gross trip generation of the shopping center to account for trips extracted from the existing traffic traveling on the adjacent arterial street system. The pass -by factor for the proposed development is obtained by using the pass -by equation for Shopping Center (Land Use Code 820) as published in the ITE Trip Generation Handbook, March 2001 (Ref. Table 5.5, p.43). The resulting pass -by rate is consistent with the proposed square footage of the retail center, since smaller centers tend to attract higher pass -by trips as compared to larger regional centers which are primary destinations. C:\Sherm\Northshore TC\2008 Projects\08TO2 Morris Edmonds Retail\Edmonds Retail Report-060408.doc Mr: G. Patrick Morris May 23, 2008 Page 3 Applying the pass -by rate factor results in a net new trip generation of 254 average daily trips and 22 p.m. peak hour trips. The resulting trip values are also consistent with the trip generation (approx. 20 p.m. peak trips) calculated using the net new trip rate (1.21 trips per 1,000 SIT) identified in Table 4 of the Edmonds Road Impact Fee Rate Study, Henderson, Young, and Company, April 15, 2003 (see page 18, Column 5, Land Use Code 820, Shopping Center). The results of the trip generation calculations for the proposed uses along with their pass -by trip reductions are summarized in Table 1. Table 1 Trip Generation Summary Trip Description ADT PM Peak Hour Gross Trips -Shopping Center (16,930 SF) 727 63 - Pass -By Trips (Less (473) (41) -Net New Trips 254 22 Therefore, the proposed development is expected to generate a net total of 254 average daily trips (ADT) with 22 trips occurring during the p.m. peak hour. The detailed trip generation analysis and summary for the daily and p.m. peak hour is shown in the appendices of this report. Trip Distribution The trip distribution of project traffic is based on existing travel patterns in the project vicinity and the primary roadway connections to the regional arterial system from the project site. The trip distribution indicates that approximately 60 percent of the project traffic is destined to the north along SR-99, with the remaining 40 percent traveling to the south of the project. Approximately 15 percent of the traffic destined northbound will head east along 230th Street SW. Approximately 7 and 8 percent of the traffic destined south will travel east and west along 234'h Street SW, respectively. Figure 3 shows the trip distribution of development traffic used for the traffic analysis. Figure 4 depicts the p.m. peak hour trip assignment for the new and pass -by trips generated by the project. Figure 5 shows the net total project trip assignment which combines the net new trips with the pass -by trips. The tabular summaries of the trip assignments are attached in the Appendix of this report. CASherm\Northshore TC\2008 Projects\08T02 Morris Edmonds Retail\Edmonds Retail Report-060408.doc Mr: G. Patrick Morris May 23, 2008 Page 4 TRAFFIC IMPACT ANALYSIS Background Traffic Growth As requested by the City of Edmonds, current p.m. peak hour turn movement counts were obtained for the intersection of 234th Street SW with SR-99. The new p.m. peak hour counts were conducted on March 19, 2008 during the p.m. peak hours. The detailed traffic counts are attached in the Appendix of this report. Historic traffic growth trends shown for average daily traffic (ADT) volumes documented by WSDOT indicated no traffic growth projected along SR-99 between 2003 and 2006. However, for the purposes of the level of service analysis conducted for this report and to estimate future traffic volumes for the project buildout years (2009 and 2014), an annual compounding growth factor of one (1%) percent was applied to existing volumes to account for background traffic and to determine baseline future traffic volumes at the study intersection along SR-99. No additional pipeline project traffic from adjacent developments were identified as additional background traffic growth based on discussions with City of Edmonds staff. Level of Service Analysis As suggested by the City of Edmonds Traffic Engineer, level of service (LOS) analyses were conducted for the subject SR-99 intersection at 234 th Street SW and the site access driveway on SR-99. The LOS analysis was performed for the weekday p.m. peak hour under the year 2009 (buildout) and 2014-with-project conditions (five years after buildout), as required by City of Edmonds Traffic Analysis requirements. All LOS analysis calculations utilize the methodology outlined in the 2000 Highway Capacity Manual Update, Special Report 209, Transportation Research Board and Synchro, support software developed by Trafficware. Table 2 summarizes the LOS analysis conducted for the proposed -development. CASherm\Northshore TC\2008 Projects\08TO2 Morris Edmonds Retail\Edmonds Retail Report-060408.doc Mr G. Patrick Morris May 23, 2008 Page 5 Table 2 Level of Service Summary Analysis Scenario Intersection with SR 99 234 th Street SW Access Driveway 2008 Existing LOS E (41.2 sec) n/a 2009 Baseline LOS E (42.3 sec) n/a 2009 with Project LOSE (41.4 sec)* LOS C (20.6 sec) 2014 Baselle LOS E (46.8 sec) n/a 2014 with Project LOS E (46.8 sec) LOS C (21.9 sec) *Note: The minor approach delay under the 2009 with Project scenario is lower than the 2009 Baseline condition because the additional project trips entering the intersection are adding to the non -critical traffic movements through the intersection which lowers the delay per vehicle for the critical movements. The results of the level of service analysis indicate that the intersection of SR-99 and 234h Street SW currently operates at LOS E for the minor street approach and will continue to operate at LOS E under future 2009 and 2014 baseline and with -project conditions. The approach LOS grade was also analyzed and reported for the proposed access driveway intersection. The unsignalized site access driveway will operate at LOS C for the driveway approach to SR-99 upon buildout of the project in 2009 and also in 2014. The detailed LOS calculations are shown in the Appendix of this report. Mitigation Requirements In accordance with the Edmonds Community Development Code (ECDC) 18.82.120, the development is obligated to pay their fair share of mitigation costs towards the City of Edmonds transportation improvement projects as required by the City's traffic impact fee guidelines. The City of Edmonds requires a unit traffic mitigation fee contribution of $0.93 per square foot of Shopping Center floor area (ITE Code 820) as outlined in Table 4 (Traffic Impact Fees) of the Edmonds Road Impact Fee Study. Therefore, with 16,930 square feet of proposed Shopping Center floor area, the Edmonds Retail Shopping Center development is obligated to contribute a total traffic mitigation fee of $15,744.90 (16,930 square feet x $0.93 per SF) for City transportation improvement programs. Table 3 summarizes the traffic mitigation fee required for the proposed development. C:\Shenn\Northshore T02008 Projects\08TO2 Morris Edmonds Retail\Edmonds Retail Report-060408.doc Mr."G. Patrick Morris May 23, 2008 Page 6 Table 3 Traffic Mitigation Summary City of Edmonds Unit Cost Units of Measure Project Fee Shopping Center (ITE Code 820) $0.93 per SF 16,930 SF $15,744.90 We trust that the trip generation and traffic analysis conducted above for the proposed Edmonds Shopping Center Development provides you with the information necessary for the City of Edmonds to complete their review of this development. This study was prepared by a licensed Professional Engineer in the State of Washington and a Mem� ber of the Institute of Transportation Engineers. Please contact us if you have any questions or concerns regarding the infort-nation documented herein. Sincerely, NORTHSHORE TRAYYAC CONSULTANTS 4��/ Shern'tnan D. Goong, P.E. Project Principal Attachments I �XPIRES__ 12-04-01__, C:\Sherm\Northshore T02008 Projects\08TO2 Morr is Edmonds Retail\Edmonds Retail Report 060408.doc I — �77� -E� 00 J Edmonds Retail Traffic Study 00HORC Project Vicinity Map CN( Ab� TRAFFIC CONSULTANTS Figure I ILL., aim" =Wwsv�T Sir 41. a IK AC.N J COMO a 00.6 �H5 H �Oc TR-AFFIC CONSULTANTS -#EAL q I )! -11-10 6 0. AWAS 41AM26 MM SM AWA - SAM 41 M—wimusmMm- r.0 1hplanw-WIF AR�Nw�ffdwmftmw Edmonds Retail Traffic Study Site Plan Figure 2 110 35 230th Steet SW 60 Project C Site 4) Co 40 234th Street SW 8 7 --I:c 8 T 25 99 Legend Fx—] Percent Project Trips J Edmonds Retail Traffic Study ORZHORC Project Trip Distribution ILK, ANMM TRAFFIC CONSULTANTS FiRure 3 t 230th Steet SW I I IL I (-) � I t PTS] CK O�R., H 5 0 k �C' TRAFFIC CONSULTANTS 2 7107 ; �/.W 6 (14) --0, 6(9) 234th Street SVY Legend XX New Trips (XX) Passby Trips Edmonds Retail Traffic Study New and Passby Project Trips PM Peak Hour Figure 4 230th Steet SW 2/2 20 15 to I 234th Street SW t 99 Legend XX Net Total Trips I Edmonds Retail Traffic Study Net Total Project Trips PM Peak Hour TR-AFFIC CC7)NSUILTANTS Figure 5 Re: Traffic Impact Study for Proposed Trip Generation Calculations NTC Project No. Edmonds Retail Center 08TO2 Proposed Landuse Quantity ITE Land Use Code Land Use 1. Shopping Center 16,930 Square Feet 820 Retail 1. Shopping Center ITE Land Use Code 820 Land Use Quantity 16,930 Square Feet Average Daily Traffic ITE Trip Rate: 42.94 trips per 1000 Square Feet Inbound 50% Outbound 50% Average Daily Traffic 727 trips Pass -By Reduction 65% Net Average Daily Traffic 254 PIVI Peak Hour Trips ITE Trip Rate: 3.75 trips per 1000 Square Feet Inbound 44% Outbound 56% PIVI Peak Hour Trips 63 trips Inbound 28 trips Outbound 35 trips Pass -By Reduction 65% Net PIVI Peak Hour Trips 22 Inbound 10 Outbound 12 KANorthshore T02008 Projects=T02 Morris Edmonds Retail\[Trip Gen.x1s]Big 5 DAS Monday, April 04, 2005 Shopping Center (820) Average Vehicle Trip Ends vs: 1000 Sq. Feet Gross Leasable Area On a: Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 4 and 6 p.m. Number of Studies: 407 Average 1000 Sq. Feet GLA: 379 Directional Distribution: 48% entering, 52% exiting Trip Generation per 1000 Sq. Feet Gross Leasable Area Average Rate Range of Rates Standard Deviation -- 3.75 0.68 - 29.27 2.75 L)aza viot ana tquation 1 9,000 1 8,000 7,000 6,000 uJ 0. 5,000 0) 4,000 3.000 2.000 1.000 0 0 1000 2000 X = 1000 Sq. Feet Gross Leasable Area X Actual Data Points Fitted Curve Fitted Curve Equation: Ln(T) = 0.66 Ln(X) + 3.40 ------ Average Rate R 2 = 0.81 3000 Trip Generation, 7th Edition 1453 Institute of Transportation Engineers Shopping Center (820) Average Vehicle Trip Ends vs: 1000 Sq. Feet Gross Leasable Area On a: Weekday Number of Studies: 302 Average 1000 Sq. Feet GLA: 328 Directional Distribution: 50% entering, 50% exiting Trip Generation per 1000 Sq. Feet Gross Leasable Area A erage Rate Range of Rates Standard Deviation 42.94 12.50 - 270.89 21.38 ucatcz r-iwt milu r-qui-mon 1 70,000 1 60,OOC 50,000 LU 40.000 30.000 F- 20.000 10,000 0 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 X = 1000 Sq. Feet Gross Leasable Area X Actual Data Points - Fitted Curve ------ Average Rate Fitted Curve Equation: Ln(T) = 0.65 Ln(X) + 5.83 R 2 = 0.78 Trip Generation, 7th Edition 1451 Institute of Transportation Engineers nata Piat C0 CL Figure 5.5 Shopping Center (820) Average Pass -By Trip Percentage vs: 1,000 Sq. Feet Gross Leawble Area On a: Weekday, Rm. Peak Period Number of Studies: 100 Average 1,000 Sq. Feet GLA: 329, 120 110 100 go 80 70 80 50 40 30 20 10 0 .............. ...... ............. ...... ...... ...... ....... I ....... )< . . . . . . . . . . . . . . . ... . X. ...... ...... ...... ...... ............. ................. ...... ......................................... x...... ....... : ................. x .......... . . . . . . . . . . . . ... . . . . . . .......................... ............ X x x ............. ...... -)GK-: ... X .... ...... ......... x : . . x x x ............. ...... ...... ...... ...... T X��: XX x X.: X� XK 4 )f : x �x ........ X ...................................................... x x X* X Y4 :x x ............ . ...... X .......... .x X x : X X )� . : x...... ........ �( ............................. 0 100 300 400 SIX) 6011 700. aw X 1,000 Sq. Feet Gross Leasable Area X Actual Data Points Fitted Curve Fitted Curve Equation: Ln(T) -0.291 Ln(X) + 6.001 21' f> 9w low 1100 1300 I THp Generation Handbook Chapter 5 0 ITE 43 Edmonds Retail TIA Existing Year 2008 Opening Year 2009 Analysis Year 2014 OBT02 Growth Rate: 1.0% Turn Movement Count Data Northbound Southbound Eastbound Westbound Count Left Thru Right Left Thru Right Left I Thru Right Left Thru Right Intersection Total Year SR 99 @ 234th Street SW 36 1,639 18 36 11119 53 is 0 14 7 3 10 Z950 2008 SR 99 @ Site Driveway 0 1,664 0 0 1,208 0 0 0 0 0 0 0 Z872 2008 3 0 4 0 5 0 PHF HV PHIF HV PHIF HV PHIF HV SR 99 @ 234th Street SW 0.95 2% 0.91 2% 0.81 3% 0.56 0% SR 99 @ Site Driveway 3 4 Existing (2008) Northbound Southbound Eastbound Westbound Left Thru Right Left Thru Right Left I Thru I Right Left Thru I Right Intersection Total SR 99 @ 234th Street SW 36 1,639 18 36 1,119 53 Is 0 14 3 10 Z950 SR 99 @ Site Driveway 0 1,664 0 0 1,208 0 0 0 0 0 0 0 Z872 3 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 .5 0 0 0 0 1 0 0 0 0 0 0 0 0 0 Opening Year without (2009) Northbound Southbound Eastbound Westbound Left Thru Right Left Thru Right Left Thru Right Left Thru Right Intersection Total SR 99 @ 234th Street SW 36 1,655 18 36 1,130 54 15 0 14 7 3 10 Z980 SR 99 @ Site Driveway 0 1,681 0 0 1,220 0 0 0 0 0 0 0 Z901 3 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 15 1 0 0 . 0 0 . 0 0 0 0 0 0 0 0 1 0 Net Project Volumes Northbound Southbound Eastbound Westbound Intersection Left Thru Right Left Thru Right Left Thru Right Left Thru Right Total SR 99 @ 234th Street SW 2 1 1 2 1 1 8 SR 99 @ Site Driveway 11 -7 -11 17 20 is 45 3 0 4 0 0 -J Opening Year with Project (2009) Northbound Southbound Eastbound Westbound Left Thru Right Left Thru I Right Left Thru Right Left Thru Right Intersection Total SR 99 @ 234th Street SW 36 1,657 is 37 1,131 S6 16 0 14 7 3 11 Z988 SR 99 @ Site Driveway 11 1,674 0 0 1,209 17 20 0 is 0 0 0 Z946 3 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 's 0 0 0 0 0 0 0 0 0 0 0 0 0 Future with Project (2014) Northbound Southbound Eastbound Westbound Pro - Left Thru Right Left Thru Right Left I Thru I Right Left Thru Right Intersection Total Share SR 99 @ 234th Street SW 38 1,742 19 39 1,189 58 17 0 is 7 3 12 3,139 0.949 SR 99 @ Site Driveway 11 1,759 0 0 1,271 17 20 0 is 0 0 0 3,094 0.938 3 0 0 0 0 0 0 0 0 0 0 0 0 0 #### 4 0 0 0 0 0 0 0 0 0 0 0 0 0 #### L5 0 , 0 , 0 0 0 0 0 0 0 1 0 1 0 1 0 1 0 #### TTRA FFIC DATA GATHERING TURNING MOVEMENTS DIAGRAM 4:00 - 6:00 PM PEAK HOUR: 5:00 PM TO 6:00 PM E 2.872 U) 53 1 19 36 234th Street SW 234th Street SW 10 3 7 > 15 29 0 54 14 01000,11, 36 1639 18 HV PHF (y) INTERSECTION a) SB 2% 0.91 PEAK HOUR VOLUME (n NB 2% 0.95 IN 2,950 W13 IOUT L 2,8 EB 3%0 INTRS. 2% HV Heavy Vehicles PHF Peak Hour Factor SR-99 @ 234th Street SW Snohomish County, WA COUNTED BY: JH/PB DATE OF COUNT Wed. 3/19/08 REDUCED BY: CN TIME OF COUNT: 4:00 - 6:00 PM REDUCTION DATE: fri. 3/21/08 WEATHER: Sunny TTRAFFIC DATA GATHERfNG INTERSECTION TURNING MOVEMENTS REDUCTION SHEET LOCATION: SR-99 @ 234th Street SW DATE OF COUNT: Snohomish County, WA TIME OF COUNT: Wed. 3/19/08 COUNTED BY: 4:00 - 6:00 PM WEATHER: JH/PB Sunny TIME FROM NORTH ON FROM SOUTH ON FROM EAST ON FROM WEST ON INTERVAL SR-99 SR-99 234th Street SW 234th Street SW INTERVAL ENDING TOTALS Left Thru Right Lft Thru Right �-"H'W'� Left Thru Right Left Thru Right AT 02:15 PM 0 0 0 :-40:;', 0 0 0 w�zo',OL 0 0 0 0 0 0 0 02:30 PM 0 0 0 '40:11N 0 0 0 0 0 ;1 0 0 0 0 02:45 PM 0 0 0 0 0 0 0", 0 0 0 ��.O. 0 0 0 0 03:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 03:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 03:30 PM 0 0 0 0 0 0 0 0 0 0, 0 0 0 0 03:45 PM �t_ M, 0 0 0 0 0 0 lj�rll 0 0 0 -:40 4� 0 0 0 0 04:00 PM 0 0 0 0 0 0 0 0 0 0 1:40' 0 0 0 0 04:15 PM 5 247 15 12 350 1 2 0 3 07"�� 2 2 2 641 04:30 PM 9 302 15 .-1 5 388 5 W" 1 0 1 1 7 0 5 738 04:45 PM 2 270 12 9 433 3 01:1�..' 0 0 3 3 3 0 3 738 05:00 PM 6 258 16 :Z!54�0 8 375 4 0 10 1 1 4 684 05:15 PM 12 305 15 13 430 1 0 0 1 0 0 3 780 05:30 PM 5 10 270 11 10 418 3 0..'1_?w 1 0 4 0 5 0 4 736 05:45 PM 4 .4�-X 13 279 23 4 377 10 oli-11 3 0 2 0��,:!-z 2 0 6 1 719 06:00 PM 1 265 4 11-, 9 414 4 0,"�'_'- 3 3 3 0 8 0 1 715 PEAK HOUR J. TOTALS 53 C!,31' 36 1639 18 �_"'o 7 3 10 15 0 14 INTERSECTION ALL MOVEMENTS 1208 1693 20 29 2950 HV 1 2% 1 2% 0% 3% 1 2% P :HOUR TOR I 0.91 0.95 0.56 0.81 0.95 HV =Heavy Vehicles PHF = Peak Hour Factor 4:00 - 6:00 PM PEAK HOUR: 1 5:00 PM TO 6:00 PM —] REDUCED BY: ' CN DATE OF REDUCTION: 3/21/2008 STATE OF WASHINGTON - DEPARTMENT OF TRANSPORTATION T R I P S S Y S T E M ANNUAL TRAFFIC REPORT STATE ROUTE FUNCT TRUCK PERCENTAGES STATE ROUTE MILEPOST LOCATION COUPLET CLASS SNGL DBL TRIPLE TOTAL 099 026.01 BEFORE JCT HOLDEN ST WYE CONN 1 099 028.54 BEFORE RAMP E MARGINAL WAY 1 099 028.86 BEFORE RAMP SPOKANE ST EB 1 099 029.37 AT ADC LOCATION R101 1 04 01 05 099 030.65 BEFORE RAMP 1ST AVE S C 1 099 031.30 AFTER RAMP SENECA ST C 1 099 031.79 BEFORE RAMP ELLIOT AVE 1 099 032.02 AT ALASKAN WAY VIADUCT 1 099 032.03 AFTER RAMP WESTERN AVE*WESTERN AVE 1 099 034.73 BEFORE RAMP N 38TH ST 099 034.85 AFTER JCT N 38TH ST 099 035.67 AFTER JCT N 50TH ST 1 099 036.45 BEFORE JCT W GREEN LAKE WAY N 1 099 037.46 BEFORE JCT N 85TH ST 1 099 037.46 AFTER JCT N 85TH ST 1 099 038.47 BEFORE JCT N NORTHGATE WAY*105TH ST 1 099 038.47 AFTER JCT N NORTHGATE WAY*105TH ST 1 099 040.47 BEFORE JCT SR 523*N 145TH ST 1 099 040.98 AFTER JCT N 155TH ST WYE CONN 1 099 041.74 AFTER JCT N 170TH ST 1 099 043.24 BEFORE JCT N 200TH ST 1 099 043.24 AFTER JCT N 200TH ST 1 099 043.52 AFTER JCT N 205TH ST WYE CONN 1 099 043.67 AFTER RAMP SR 104 1 099 046.83 BEFORE JCT SR 524 WYE CONN 1 099 046.94 AFTER JCT 60TH AVE W 1 099 048.85 AFTER JCT 168TH ST SW WYE CONN 1 099 049.11 BEFORE JCT 164TH ST SW 1 ** COUPLET SKETCH IN BACK OF BOOK 123 AVERAGE DAILY TRAFFIC VOLUME ---------------------------------- 2003 2004 2005 2006 UNITS UNITS UNITS UNITS 32000 30000* 31000 31000 57000* 48000* 75000* 75000+ 39000 39000 39000* 39000 39000* 79000* 50000* 55000* 71000* 71000 71000 54000* 54000 54000 47000 43000* 44000 44000 40000* 41000 41000 38000 37000* 37000 37000 38000 39000* 40000 40000 35000 36000* 36000 36000 36000 33000* 34000 34000 34000 34000* 34000 34000 37000 39000* 39000 39000 38000 38000* 39000 39000 31000 33000* 33000 33000 31000 34000* 35000 35000 33000 36000* 36000 36000 34000* 34000 34000 .4,4 mc> 33000* 33000 33000 34000* 35000 35000 31000* 32000 32000 33000* 31000 32000 32000 * BASED ON ACTUAL COUNT + SOURCE OF TRUCK PERCENTAGES H:\2008\SGoong Development LOS\Synchro\2008 Exising PM.sy7 1: 234th Street SW & SR-99 Edmonds Retail --* --* --* \,r *-- t 4/ Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 4� 4* 1 ++T# I ++T* Sign Control Stop Stop Free Free Grade 0% 0% 0% 0% Volume (veh/h) 15 0 14 7 3 10 36 1639 18 36 1119 53 Peak Hour Factor 0.81 0.81 0.81 0.56 0.56 0.56 0.95 0.95 0.95 0.91 0.91 0.91 Hourly flow rate (vph) 19 0 17 12 5 18 38 1725 19 40 1230 58 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type TWLTL TWLTL Median storage veh) 2 2 Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 2009 3158 439 2317 3178 585 1288 1744 vC1, stage 1 conf vol 1338 1338 1811 1811 vC2, stage 2 conf vol 671 1820 506 1367 vCu, unblocked vol 2009 3158 439 2317 3178 585 1288 1744 tC, single (s) 7.6 6.6 7.0 7.5 6.5 6.9 4.1 4.1 tC, 2 stage (s) 6.6 5.6 6.5 5.5 tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2 pO queue free % 85 100 97 83 94 96 93 89 cM capacity (veh/h) 127 69 563 74 91 460 534 356 Direction, Lane # EB 1 WB 1 NB 1 NB 2 NB3 NB 4 SB 1 SB 2 SB 3 SB 4 Volume Total 36 36 38 690 690 364 40 492 492 304 Volume Left 19 12 38 0 0 0 40 0 0 0 Volume Right 17 18 0 0 0 19 0 0 0 58 cSH 203 134 534 1700 1700 1700 356 1700 1700 1700 Volume to Capacity 0.18 0.27 0.07 0.41 0.41 0.21 0.11 0.29 0.29 0.18 Queue Length 95th (ft) 16 25 6 0 0 0 9 0 0 0 Control Delay (s) 26.5 41.2 12.3 0.0 0.0 0.0 16.4 0.0 0.0 0.0 Lane LOS D E B C Approach Delay (s) 26.5 41.2 0.3 0.5 Approach LOS D E Intersection Summary Average Delay 1.1 Intersection Capacity Utilization 42.1% ICU Level of Service A Analysis Period (min) 15 Gibson Traffic Consultants, Inc. for Northshore Traffic Consultants 2008 Existing Conditions Gibson Traffic Consultants, Inc. H:\2008\SGoong Development LOS\Synchro\2009 Baseline PM-sy7 1: 234th Street SW & SR-99 Edmonds Retail --* --* --* 4e *- ',- 4\ t 1* "W 4 4/ Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 4# 4* ++1� ) +0 Sign Control Stop Stop Free Free Grade 0% 0% 0% 0% Volume (veh/h) 15 0 14 7 3 10 36 1655 18 36 1130 54 Peak Hour Factor 0.81 0.81 0.81 0.56 0.56 0.56 0.95 0.95 0.95 0.91 0.91 0.91 Hourly flow rate (vph) 19 0 17 12 5 18 38 1742 19 40 1242 59 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type TWLTL TWLTL Median storage veh) 2 2 Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 2028 3187 444 2338 3208 590 1301 1761 vC1, stage 1 conf vol 1351 1351 1827 1827 vC2, stage 2 conf vol 677 1837 510 1380 vCu, unblocked vol 2028 3187 444 2338 3208 590 1301 1761 tC, single (s) 7.6 6.6 7.0 7.5 6.5 6.9 4.1 4.1 tC, 2 stage (s) 6.6 5.6 6.5 5.5 tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2 pO queue free % 85 100 97 83 94 96 93 89 cM capacity (veh/h) 125 67 559 72 89 456 528 351 Direction, Lane # EB 1 WI3 1 NB 1 NB 2 N133 N134 SB 1 S13 2 SB 3 S13 4 Volume Total 36 36 38 697 697 367 40 497 497 308 Volume Left 19 12 38 0 0 0 40 0 0 0 Volume Right 17 18 0 0 0 19 0 0 0 59 cSH 199 131 528 1700 1700 1700 351 1700 1700 1700 Volume to Capacity 0.18 0.27 0.07 0.41 0.41 0.22 0.11 0.29 0.29 0.18 Queue Length 95th (ft) 16 26 6 0 0 0 9 0 0 0 Control Delay (s) 27.0 42.3 12.3 0.0 0.0 0.0 16.6 0.0 0.0 0.0 Lane LOS D E B C Approach Delay (s) 27.0 42.3 0.3 0.5 Approach LOS D E Intersection Summary Average Delay 1.1 Intersection Capacity Utilization 42.4% ICU Level of Service A Analysis Period (min) 15 Gibson Traffic Consultants, Inc. for Northshore Traffic Consultants 2009 Opening Year without Development Gibson7raffic Consultants, Inc. H:\2008\SGoong Development LOS\Synchro\2009 Future w Dev PM.sy7 1: 234th Street SW & SR-99 Edmonds Retail Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 4# 40 1 +0 ++T* Sign Control Stop Stop Free Free Grade 0% 0% 0% 0% Volume (veh/h) 16 0 14 7 3 11 36 1657 18 37 1131 56 Peak Hour Factor 0.81 0.81 0.81 0.56 0.56 0.56 0.95 0.95 0.95 0.91 0.91 0.91 Hourly flow rate (vph) 20 0 17 12 5 20 38 1744 19 41 1243 62 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type TWLTL TWLTL Median storage veh) 2 2 Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 2034 3194 445 2342 3215 591 1304 1763 vC1, stage 1 conf vol 1355 1355 1829 1829 vC2, stage 2 conf vol 680 1839 513 1386 vCu, unblocked vol 2034 3194 445 2342 3215 591 1304 1763 tC, single (s) 7.6 6.6 7.0 7.5 6.5 6.9 4.1 4.1 tC, 2 stage (s) 6.6 5.6 6.5 5.5 tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2 pO queue free % 84 100 97 83 94 96 93 88 cM capacity (veh/h) 123 66 558 72 89 455 527 350 Direction, Lane # EB 1 WB 1 NB 1 NB 2 NB3 NB 4 SB 1 SB 2 SB 3 SB4 Volume Total 37 38 38 698 698 368 41 497 497 310 Volume Left 20 12 38 0 0 0 41 0 0 0 Volume Right 17 20 0 0 0 19 0 0 0 62 cSH 194 136 527 1700 1700 1700 350 1700 1700 1700 Volume to Capacity 0.19 0.28 0.07 0.41 0.41 0.22 0.12 0.29 0.29 0.18 Queue Length 95th (ft) 17 26 6 0 0 0 10 0 0 0 Control Delay (s) 27.9 41.4 12.4 0.0 0.0 0.0 16.6 0.0 0.0 0.0 Lane LOS D E B C Approach Delay (s) 27.9 41.4 0.3 0.5 Approach LOS D E Intersection Summary Average Delay 1.2 Intersection Capacity Utilization 42.4% ICU Level of Service A I Analysis Period (min) 15 Gibson Traffic Consultants, Inc. for Northshore Traffic Consultants 2009 Opening Year with Development Gibson Traffic Consultants, Inc. HA2008\SGoong Development LOS\Synchro\2014 Future w Dev PM.sy7 1: 234th Street SW & SR-99 Edmonds Retail Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 4� 4* 1 +0 ++To Sign Control Stop Stop Free Free Grade , 0% 0% 0% 0% Volume (veh/h) 17 0 15 7 3 12 38 1742 19 39 1189 19 Peak Hour Factor 0.81 0.81 0.81 0.56 0.56 0.56 0.95 0.95 0.95 0.91 0.91 0.91 Hourly flow rate (vph) 21 0 19 12 5 21 40 1834 20 43 1307 21 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median'type TWLTL TWLTL Median: storage veh) 2 2 Upstream signal (ft) pX, platoon unblocked VC, conflicting volume 2118 3336 446 2463 3337 621 1327 1854 vC1, stage 1 conf vol 1403 1403 1924 1924 vC2, stage 2 conf vol 715 1934 540 1413 vCu, unblocked vol 2118 3336 446 2463 3337 621 1327 1854 tC, single (s) 7.6 6.6 7.0 7.5 6.5 6.9 4.1 4.1 tC, 2 stage (s) 6.6 5.6 6.5 5.5 tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2 pO queue free % 81 100 97 80 93 95 92 87 cM capacity (veh/h) 113 54 557 63 80 435 516 323 Direction, Lane # EB 1 WB 1 NB 1 NB 2 NB 3 NB 4 SB 1 SB 2 SB 3 SB 4 Volume Total 40 39 40 733 733 387 43 523 523 282 Volume Left 21 12 40 0 0 0 43 0 0 0 Volume Right 19 21 0 0 0 20 0 0 0 21 cSH 1 180 124 516 1700 1700 1700 323 1700 1700 1700 Volume to Capacity 0.22 0.32 0.08 0.43 0.43 0.23 0.13 0.31 0.31 0.17 Queue Length 95th (ft) 20 31 6 0 0 0 11 0 0 0 Controt Delay (s) 30.6 46.8 12.6 0.0 0.0 0.0 17.9 0.0 0.0 0.0 Lane LOS D E B C Approach Delay (s) 30.6 46.8 0.3 0.6 Approach LOS D E Intersection Summary Average Delay 1.3 Intersection Capacity Utilization 44.1% ICU Level of Service A Analysi I s Period (min) 15 Gibson, Traffic Consultants, Inc. for Northshore Traffic Consultants 2014 Future with Development Gibson Traffic Consultants, Inc. H:\2008\SGoong Development LOS\Synchro\2009 Future w Dev PM.sy7 2: Site Access & SR-99 Edmonds Retail 4% t 4 Movement EBL EBR NBL NBT SBT SBR Lane Configurations y +++ tO Sign Control Stop Free Free Grade 0% 0% 0% Volume (veh/h) 20 15 11 1674 1209 17 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 22 16 12 1820 1314 18 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type TWLTL Median storage veh) 2 Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 1954 447 1333 vC1, stpge 1 conf vol 1323 vC2, stage 2 conf vol 630 vCu, unblocked vol 1954 447 1333 tC, single (s) 6.8 6.9 4.1 tC, 2 stage (s) 5.8 tF (s) � 3.5 3.3 2.2 pO que6e free % 89 97 98 cM capacity (veh/h) 194 559 514 Direction, Lane # EB 1 NB 1 NB 2 N133 N134 S13 1 SB 2 SB 3 Volume Total 38 12 607 607 607 526 526 281 Volume Left 22 12 0 0 0 0 0 0 Volume Right 16 0 0 0 0 0 0 18 cSH 269 514 1700 1700 1700 1700 1700 1700 Volume to Capacity 0.14 0.02 0.36 0.36 0.36 0.31 0.31 0.17 Queue Length 95th (ft) 12 2 0 0 0 0 0 0 Control Delay (s) 20.6 12.2 0.0 0.0 0.0 0.0 0.0 0.0 Lane LOS C B Approach Delay (s) 20.6 0.1 0.0 Approach LOS C I Intersection Summary Average Delay 0.3 Intersection Capacity Utilization 42.3% ICU Level of Service A Analysis Period (min) 15 Gibson Traffic Consultants, Inc. for Northshore Traffic Consultants 2009 Opening Year with Development Gibson'Traffic Consultants, Inc. H:\2008\SGoong Development LOS\Synchro\2014 Future w Dev PM.sy7 2: Site Access & SR-99 Edmonds Retail --* N 4\ Movement EBL EBR NBL NBT SBT SBR Lane Configurations Y ) ttt ++T* Sign Control Stop Free Free Grade 0% 0% 0% Volume (veh/h) 20 15 11 1759 1271 17 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 22 16 12 1912 1382 18 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median, type TWLTL Median storage veh) 2 Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 2052 470 1400 vC1, stage 1 conf vol 1391 vC2, stage 2 conf vol 661 vCu, unblocked vol 2052 470 1400 tC, single (s) 6.8 6.9 4.1 tC, 2 stage (s) 5.8 tF (s) 3.5 3.3 2.2 pO queue free % 88 97 98 cM capacity (veh/h) 179 540 484 Direction, Lane # EB 1 NB 1 NB 2 NB 3 N134 SB 1 SB 2 SB 3 Volume Total 38 12 637 637 637 553 553 295 Volume Left 22 12 0 0 0 0 0 0 Volume Right 16 0 0 0 0 0 0 18 cSH 251 484 1700 1700 1700 1700 1700 1700 Volume to Capacity 0.15 0.02 0.37 0.37 0.37 0.33 0.33 0.17 Queue Length 95th (ft) 13 2 0 0 0 0 0 0 Control Delay (s) 21.9 12.6 0.0 0.0 0.0 0.0 0.0 0.0 Lane LOS C B Approach Delay (s) 21.9 0.1 0.0 Approach LOS C Intersection Summary Average Delay 0.3 Intersection Capacity Utilization 44.0% ICU Level of Service A Analysis Period (min) 15 Gibson Traffic Consultants, Inc. for Northshore Traffic Consultants 2014 Future with Development Gibson Traffic Consultants, Inc. I Edmonds Road Impact Fee Rate Study TABLE 4 IMPACT FEE RATES (1) (2) (3) (4) (5) (6) Trip ITE rrE Land Use Trip % New Length Net New Trips per Impact Fee Per Unit @ $ Code Category Rate' Trips' Factor4l Unit of Measure 763.66 per Trip 110 Light Industrial 0.98 100% 1.59 1 1.56 1,000 sq ft 1.19 per square foot 140 Manufacturing 0.74 100% 1.59 1.18 1,000 sq ft 0.90 per square foot 151 Mini -warehouse 0.26 100% 1.59 0.41 1,000 sq ft 0.32 per square foot 210 Single family 1.01 100% 1.09 1.10 dwelling 840.72 per dwelling unit House 220 Apartment 0.62 100% 1.15 0.71 dwelling 544.49 per dwelling unit 230 Condominium 0.54 100% 1.15 1 0.62 dwelling 474.24 per dwelling unit 240 Mobile Home 0.56 100% 1.09 0.61 dwelling 466.14 per dwelling unit 310 Hotel 0.61 100% 1.25 0.76 room 1 582.29 per room 320 Motel 0.47 100% 1.25 0.59 room 448.65 per room 420 Marina 0.19 100% 0.97 0.18 berth 140.74 per boat berth 430 Golf course 0.30 100% 1.00 0.30 acre 229.10 per acre 444 Movie Theater 3.80 100% 0.72 2.74 1,000 sq ft 1.36 per square foot 492 Racquet club 1.83 100% 0.97 1.78 1,000 sq ft 3.58 per square foot 530 High School 1.02 100% 0.62 0.63 1,000 sq ft 0.48 per square foot 560 Church 0.66 100% 1.1S 1 0.76 1,000 sq ft 0.58 per square foot 610 Hospital 0.92 100% 1.56 1.44 1,000 sq ft 1. 10 per square foot 620 Nursing home 0.20 100% 0.87 1 0.17 bed 132.88 per bed 710 General Office 1.49 100% 1.59 2.37 1,000 sq ft 1.81 per square foot 720 Medical office 3.66 100% 1.50 5.49 1,000 sq ft 4.19 per square foot -820 Shopping Center 3.74 81% 0.40 j 1,000 sq ft 0.93 per square foot -z 832 Restaurant: sit- 10.86 56% 11.96 ,zLl 6.45 1,000 sq ft 4.92 per square foot down . I 833 Fast food, no 26.15 52% 0.62 B.-,j 1,000 sq ft 6.44 per square foot drive -up 834 Fast food, w/ 33.48 51% 0.62 1O.S9 1,000 sq ft 8.08 per square foot drive -up 844 Gas station 14.56 60% 0.53 4.63 pump 3,535.82 per yfp 845 Gas station 13.38 47% 0.53 3.33 pump 2,545.26 per vfp' w/convenience 850 Supermarket 11-51 55% 0.65 4.11 1,000 sq ft 3.14 per square foot 851 Convenience 53.73. 39% 0.40 8.38 1,000 sq ft 6.40 per square foot market-24 hr 912 Drive-in Bank 1 54.771 51%1 0.47 1 13.13 1,000 sq ft 1 10.03 per square fooi-i ' ITE Trip Generation (6th Edition): 4-6 PM Peak Hour Trip Ends 3 Excludes pass -by trips: see OTrIp Generation Handbook: An ITE Proposed Recommended Practice' (1988) 4 Ratio to average trip length. 5 vfp: vehicle fueling position Henderson, Young & Company City of Edmonds, Washington April 15, 2003 Page 18 CITY OF EDMONDS TRAFFIC IMPACT ANALYSIS WORK SHEET Name of Proposed Project: Owner/Applicant: M e=— 0, , A A-P---T (P--� Name Street/Mailing Address 0 -2-0 city State zip Telephone: ( — Applicant Contact Person: Mr.,,- , Name Street/Mailing Address city Telephone: Traffic Engineer who prepared the Traffic Impact Analysis: State zip K�,o--rK&�,oa-e--Toe� 0 FirrnNwne Contact Name Telephone 1. PROJECT DESCRIPTION a. Street address (iftnown): b. Location: V\1 9 1)-- Ac-P O—P,-rj� 0 F-- A-e,,S C> L -T, o C7 5RCE E(Cs, LA- A-,\.)-r> 2-- --rKAFEC- S-rIA (��Y (A itach a vicinity map and site plan.) c. Specify existing land use: V,4e-A-Nx-r d. Specify proposed type and size of development 4S.J-Lf)(> P'L t,.� < CE-fy�� Pe-T�(L- 1( 1 �, I ot'?. 0 -5 6L . *==�- �� e. When will the project begin construction and when will it be completed? -,,> 0 C 51,1 f. Define proposed access locations: 0N-G7 C��P-tvj -ro ��e-ctq g. Define' osed sight distance at site egress locations: prop -QW-WC3�AL-1 (5Z -T&e- -13�0-cw PIS C, LL (,D S—ro Fr r-r-�LA-10-t-IrN Page I F:T 2. TRIP GENERATION a. Existing Site Trip Generation Table: r.1 Land Use Daily (ADT) Z— PM Peak -Hour Trips zZ IN b. Proposed Project Trip Generation Table: Land Use Daily (ADT) PM Peak -Hour Trips IN OUT -7 c. Net New Project Trip Generation Table: Land Use Daily (ADT) PM Peak -Hour Trips IN OUT ko d. State asswnptions and methodology for internal, link -diverted orpassby trips: kA-t-�,>a,ocV—, CkAf>, 4 - ;T I Kzt, 4,2, Trcc,,Lj,� S-,<37, _S KONN f,� C,�� F CT-Ct;;�N Qu,�Ulzi- , L-A f -T-) —C), Z-q k L--f-, (Y_,� -.t- S. 00 1 - Page 2 3. TRIP DISTRI19UTION Prepare and attach a graphic showing project trip distribution percentages and assignments. SEZ�- I -�!� 4. 91TE ACCESS ROADWAY/DRIVEWAYS AND SAFETY a. Have sight distance requirements at egress location been met per AASHTO requirements? 1 -700 -TJ --Clor, b. Intersection Level of Service Analysis ;A -ND. • Existing Conditions LOS - Delays 14-( - Z 5�. • Year of Opening LOS 1E Delays 4(-4- 5��C • Five Years Beyond Change of Land Use LOS Delays -4(,o 5e-c— (Intersections to be evaluated shall be determined by the City of Edmonds Traffic Engineer.) c. Describe channelization warrants: p (Attach stripingplan.) d. Vehicle Storage/Queuing Analysis (calculate 50% and 95 % queuing lengths): 50% 95% * Existing Conditions - r'� / t--- 7— t5-' FT- (F—B) Year of Opening wlt� 2�6 F-F Five Years Beyond Change of Land Use ET e. If appropriate, state stop sign and signal warrants: f Summarize local accident history: N 0--r AAJ-111A L-A�� LG�- X-7r -r-t w-t rg- df-- Page 3 5. TRAFFIC VOLUMES a. Describe existing ADT and peak -hour counts, including turning movements, on street adjacent to and directly impacted by the project. 154a I - 7Z.Ib�-770 N(>-T- "Z 0(00 9tv-, P(4- 2-10 pro--F L -Z- C) P v�, P K, b. Describe the estimated ADT and peak -hour counts, including turning movements, the year the project is fully open (with and without project traffic). cv:4t 2-at P-v'T Prv" PK_ A- t>—r c. Describe the estimated ADT and peak -hour counts, including turning movements, five years after the project has been ftilly open (with and *ithout project traffic). --'1Z_ �5� ic? ALT - rbe S-r 5VJ A-D-T PV- d. State annual background traffic growth factor and source: A-Nr,� LL4,(__C=f?-0V� E]6-C--CCb4L6r-- �0114t� 6. LEVEL OF SERVICE ANALYSIS Summarize Level of Service Analysis below and attach supporting LOS analysis documentation. Provide the following documentation for each arterial street or arterial intersection impacted by ten or more peak - hour trips. Other C*ty-planned developments must also be factored into the LOS calculations. Existine LOS: 5-t-'51,J A-"C> Existing Condition: L_0_'- E_ (4t.2- F-ep- ct-r-1--t S-r. �a Year of Openine LOS: With Project: Q&C:) 14 Without Project: er_� Page 4 Five Years After Ovenine LOS: With Project: L-b S 44o - C-) Without Project: A-G�00 ss-e-.' Note any assumptions/variations to standard analysis default values and justifications: r-ZbN c;;,7- N G�D - 7. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the Edmonds Road Impact Fee Rate Study Table 4 (attached) and as identified in ECDC 18.82.120, except as otherwise pro*vided for independent fee calculations in ECDC 18.82.130. PtFrz, C—(—CV " us,,ci7- 1-nP7 c:oix7-�, SAENGR\Darre1ACity ProjecukTIA Guide1inez\Traf1nq)Ana1yWork 9-04.cbe Page 5 h11 4A e,'§ '2; STORMWATER SITE PLAN For A 2 at Edmonds Commercial in Edmonds, WA. IECO Project: 07-0443 J Tax ID# 00576700002002 November 19,2007 Revised on: March 28, 2008 6� PREPARED FOR: A-Z @ Edmonds LLC. 23 723 112" PL W Shoreline, WA 98020 (206)542-4411 PREPARED BY: Andrew L. Dawson REVIEWED BY: Brian R. Kalab, P.E. L LXHIHES 1 1/30/2008 514 C'"ITY COPY RESUB jUN 23 2008 3630 Colby Avenue * Everett, WA 98201 # Phone: (425) 303-9363 Fax: (425) 303-9362 * Email: info@insightengineering.net TABLEofCONTENTS I. PROJECT OVERVIEW '11. PLOT PLAN Ill. PRELIMINARY CONDITIONS SUMMARY IV. OFF -SITE ANALYSIS i V. ANALYSIS AND DESIGN VI. SPECIAL REPORTS AND STUDIES VII. BASIN AND COMMUNITY PLANNING AREAS VIII. OTHER PERMITS IX. EROSION AND SEDIMENT CONTOL PLAN X. BOND QUANTITIES WORKSHEET/DETENTION SUMMARY: SHEET/DECLARATION OF COVENANT XI. MANTENANCE AND OPERATIONS MANUAL PROJECT OVERVIEW The . proposed project A-2 at Edmonds Commercial is located at 234th St. SW & HWY. 99 in the city I of Edmonds, Washington. More generally, the site is located in Section 3 1, Township 27 North, and Range 4 East of the Willamette Meridian in Snohomish County, Washington. Please I refer to the Vicinity Map attached later in this section for more details. The project contains approximately 1.37 acres. There are no critical areas located within the project site. The site is currently undeveloped and exists as cleared land. The proposal is to construct 3 new commercial buildings, the required parking spaces, and associated utilities. Access to the site will be from 234 1h ST. SW and HWY. 99. The proposal also includes frontage improvements along 234 th St. SW. The property slopes to the east towards HWY. 99. Please refer to the downstream analysis map for more details. Per SCC survey of Snohomish County, the project site contains Alderwood soils that have a hydrologic classification of Type "C". Please refer to the soils map and descri I ptions attached later in this report for more details. This report will follow the Stormwater Site Plan requirements, per Page 1-3-13 of the 1992 Stormwater Management Manual for the Puget Sound Basin, Washington State Department of Ecolo y (DOE). The project will provide an on -site Stormwater Detention/Water Quality facility 9 using the DOE recommendations. DOE Minimum Requirements Summary MR = Minimum Requirement MR# 1 Erosion and sediment Control: See Section IX MR#2 Preservation of Natural Drainage Systems: The proposed detention facilitates will discharge to the existing storm system along HWY. 99 to follow its natural drainage path. MR43 — Source Control of Pollution: Source control BMP's will be included in the SWWPP for construction of the site. Please refer to the SWPPP for more details. MR#4 — Runoff Treatment BMP's: A wet vault has been proposed for water quality conforming to the DOE Manual. Please see Section V, 'Water Quality Analysis' for more details. MR#15 — Stream Bank Erosion Control: The proposed Detention/Water Quality vault has been desig : hed to meet the DOE release rate requirements. Please see Section V for more details. MR#6 — Wetlands: There are no wetlands or critical areas located within the project site. MR#7 — Water Quality Sensitive Areas: Does not apply. MR#8 — Off -site Analysis and Mitigation: Please see Section IV for off -site analysis. The proposed detention vault will store water that is currently flowing in an unrestrained manner and will m eter a restricted flow into the downstream channel at smaller flow rates, which theoretically existed in the pre -historical condition of dense woodland. Potential violations of Water jQuality Standards are mitigated by the use of a wet vault. Potential im acts due to spills p and discharges of pollutants will be mitigated with appropriate spill control guidelines and good housekeeping of the developed site. MR49'_ Basin Planning: To date, no basin plans have been prepared for this site that would require�more stringent controls. MR# 10 — Operation and Maintenance: See Section XI. MR# I I Financial Liability: This will be determined on permit phases. VICINITY MAP PHOTO TAKEN FROM THE 2002 THOMAS BROTHERS'GUIDE CD-ROM n44 Q,- s, t n fg 3630 Colby Ave Everett, WA 98201 425-303-9363, 425-303-9362 f. Info@lnsightengineering.net FIGURE I - VICINITY MAP A-2 at Edmonds Edmonds, WA 98026 SCALE: V= 1,222' DATE: 11/19/07 1 JOB il: 07-0443 BY: KIH FILE NAME: I 07-0443/doc/VICIMTYMAP PLOT PLAN Refer to the construction plans. III. PRELIMINARY CONDITIONS SUMMARY Per Soils Survey, the majority of the project site contains Alderwood Urban Land Complex; slopes vary from 0 to 9 — percent. Please, refer to the Soils Map within this report for more details. The proposed storm drainage system shall conform to the requirements for runoff control and water quality per the 1992 Stormwater Management Manual for the Puget Sound Basin, prepared by the Washington State Department of Ecology (DOE). Per City of Edmonds, the precipitation is as follows: 2 yr/24-hr = 1.5 inches 10 yr/24-hr = 2.0 inches 100 yr/24-hr= 3.0 inches IV. OFFSITE ANALYSIS A site reconnaissance was performed by Andrew L. Dawson of Insight Engineering Company on November 8, 2007, to verify the downstream flow path and observe any drainage problems downstream of the site. The 'weather was clear and sunny. The s i ite is currently undeveloped and exists as- a cleared land. No visible on -site drainage problems were observed at the time of field investigations. Upstream Analysis Based on the site reconnaissance and the topographic survey of the area, there ar I e upstream drainage flowing into the site from the north as well as from the west. These are closed conveyance systems and we are proposing to bypass the flows to the downstream course. Downstream Analysis Please refer to the Downstream Analysis Map on the next pages for a visual description of the downstream flow. i The drainage from the property sheet flows towards the east for approximately 200 ft into the existing storm -system on HWY. 99. From there, the runoff enters into the existing Type -I catch basins ah,d flows north along HWY. 99 via 12 " pipe for over !/4mile. The visual downstream was concluded at this point. There does not appear to be any restrictions or erosion problems within %4mile of the site. STORMWATER MANAGEMENT MANUAL FOR THE pUGET SOUND BASIN IQ Tne Hydniogic 'IkQ B SP—WAY AM Niw"Oy B %whWdak B Nbokwck C suhavw B CrD sahm C Osafty C subfin B Olew ND su� C Okow= C sw6wws ND OIYM&' a Tac� D on" D TSOWIM ND OrWe D Tcdwbk ND orting ND Tcnipo C 020 C Tmcb ovall C TOW D Phoft C TOWM=d ND Pb—" C Twill= C .". M ND TWO& ND Pgcbw,k C D P -,16 � Takey ND Pbobbo C Vibm Vwi" C Whom R C VCdat C Pas" D WaPND ND pbyau-p a wanks a I Quem ND V)bWbcy ND Quaceft ND WMMIM R --,% RaSaw 8 VrWA= A Rainier C WCO&WWWC RIN& a YCIM Reed ND C Zynbw Hydrologic SoLl Group Classifications (Low runoff potential). Sails having high infiltration rates, even when thoroughly wetted, and consisting chiefly of deep, well-t�cess-ively drained sands Or gravels. These soils have a high rate Of water transmission. 13-' (Moderately low rum ' when thoroughly wette f potent'aj Soils having moderate infiltration rates d, and ame ing chiefly of moderately fine to moderately c0aX90 textures. These soils have a moderate rate of w&ter transmins- C. (Moderately high runoff potential). Lon. SOL16 having slow infiltration rates when thoroughly wetted' and consisting chiefly Of soils with a layer that impedes downward movement Of water, or soils with moderately f ine to fine textures. D. These soils*have a slow rate of water transmission. (High runoff potential)' Soils having very Blow infiltration rates. when thoroughly wetted and consisting chiefly Of clay soils with a high swelling Onti&l, soils with a permanent high water table, soils with a hnrd 2 pan or lay layer at or near the surface, and shallow soils over nearly impervious material, These soils have a very Blow rate of water transmission. ND Data not currently avaijole for this goil type. Second ion, June 1986, NIMat -A-.1. Revisions made from SCS, Soil Interpretation Record, Form IS, September 1988 and various county soj' surveys. III-1-10 FEBRUARY, 1992 PM '57 Table ZXr-1.3 SM western (Publinbed by sag ff curve Rumbezz Ln 1982) Runoff curve for ftlectW agricultural, land use suburban and urban ' f0c 2%nm 1A rainfall Stributlan, 24-hmm dL - StOM dUratIO31- T.x a= MBSCRXPTIM NUMBnS By OLOGXC SOZL GRWP ;:77 Lawnd (1): 8 C D xtaLn Opm areas: 1016 growing brush r. gressLulds 86; 91 94 95 Meadow or pasture. 74 82 ag Wood or fOV08t Land: Undisturbed 65 78 as 89 Wbod or forest 42 64 76 81 YCUU9 Becond growth or br-.h SS 72 0"% Ozcbardl 86 with cover C—rov Cpen zPaces, ImInS. parks, LwAffcaping- 902f ccmLxves, cemeteries, gal 88 -9-2 94 Good conditiem: grass cover on 2:75% of t1u. axle& 68 so FAIr conditim.- - go gra cover On SO-7S% of the area 77 as 90 92 G"'ve, zoacft a Parking 10ta-z Di ft- parkina lots-. 76 as 89 91 MqxWv'Ou8 surfaces, 72 82 87 -8-9 pave=ent, Water bodies: XOOfJ3 ate. 11-kes., 98 98 9i 98 Single family ldentlalj2)z ,-I-w&janft Pomis etc. 100 100 IGO ]LOCO DR6111=9 OhLt/arcum Acre 1-0 DVIGA is COM 1-5 VU/GA 2.0 DU/Ga 20 nunber shall be selected for 2. 5 mule& 25 30 VIOUS & "Werviolls Portlon- of the site 3-0 MU/Ga 3.5 zV/GA 34 or basin 4. 0 j)V/GA 38 42 4-5 13u/CA 46 5.0 DV/GA 48 5.S to/GA so 6.0 VVIGA 52 6.5 DU/G& S4 7.0 ng/Gh S6 PW 9, condos, apartments, cO=22=dAa busineems cue inthurtrial axnas Must be c0=0uted (1). F'or &-0=9 d8tAiled description of latrad (2) MxJlne=jmg Handbook, Sew. 4, use curve r=&e= refer and driveway runcff is ar:�=Icvyr Chapter 9, AugwM 1972. (3) '7he remaining Perw,=W areas lawn) are into-street/sto= system. 4:1002ditIon for 1the" cj2jC.M 231,12C11.4e c widered to be.Ln good - -jm- I )Event Summary —i MCI I.V, Auu FE—vent [Peak Q WS) [Peak T (hrs)) [Hy—d p­e Vol (acfftt) [Area (ac) J�Wethod liainty F6 mo—nthF—o .2iog F —800 I r '0-0729 F, .37-0 o FsB —UH `-TYPEJA 0. -' 8� 1.3700 FSBUH k'TYPEIA --�-3753 2 year F .5945 — F1 0 yearF o 8—.00F 0.2-034 —BUW, F—T -- --.Fl.37oo F�sFTYPEIA 1 00 year —1 - —6691 8.00 0.3466 - Wo .3700 Record Id FsBUH ['IT i1A -;ignthod FD SBUH FR�infall type FHyd Intv r 10-00 min Ireaking Factor F traction Coeff Pervious Area (AMC 2) --- — --------- r 0.27 ac —FDCIA FPervious CN Fp�ry i �ou s T 86-00 JDC CN 6.00 min [DC TC Pervious CN Cale 7", > 4-9 Description Open spaces, lawns,park F—sub�—rea w, s (>75% grass) IF Pervious C 0.27 ac Omposited CN (AMC 2) Pervious TC Cale F—TY—Pe Description -F 'Length —Slope FFixe—d* F C—oeff Pervious TC TYPEIA �,4�O 0.2 A ac 98.00 6:00 min Sub —cp 7 0 —0 86.00 TT min 6.00 min Direc4 COnni�ccted CN Cale Description F SubArea F —Subcn Impe'r"Vious surfaces (pavements, roofs, -e�c—)---- F—TI 6—a—c-7 980-0 DQ CoMpoSited CN (AMC 2) Directly Connected TC Cale FType Description Length Slope IF —coefP—F —misc F —TT 6.00 min Directl (;v1wVWq TQ 0 11 I AITY PLANNING AREAS is not located within a particular basin plan and/or community planning ire stricter storm drainage requirements. I VIII. OTHER PERMITS The following permits are anticipated: L N.P.D.E.S. from DOE. 12. Right -of -Way from the City of Edmonds and possibly Snohomish County. IX EROSION AND SEDIMENT CONTROL PLAN The general strategy for protection of the downstream properties is: I - Cover disturbed areas by mulching, seeding, and/or plastic covering. 2. Route off -site cl . ean r . unoff away from the disturbed areas and discharge into natural vegetation. 3. Where feasible install a sediment pond for sediment trapping. TESC is to be accomplished utilizing the following B.M.P.'s: 1. Conformance to DOE and City of Edmonds. 2. Stabilized Construction Entrance A stabilized construction entrance is located at the existing entrances along HWY. 99 and -234' St. SW. 3. Filter Fabric Fence Filter fabric fencing is to be placed along the do w*nstream clearing limit perimeters to protect adjacent properties. Fence lengths locations are shown on the TESC plans, along with necessary detai I Is and notes in conformance with the DOE requirements. 4. Catch Basin Inlet Protection On -site CBs are to receive gravel and wire mesh protection. Any off -site existing CBs affected by sediment from construction would have a minimum'filter fabric covering. The contractor shall be instructed that further measures for existing CBs may be necessary if conditions warrant. 5. Sediment Pond A sediment pond is proposed for this project. 6., Cover Measures Notes for temporary cover measures are in compliance with the City of Edmonds standards are on the construction plans. Hydroseeding and mulch are to be used to cover disturbed areas. Stockpiles are to be plastic covered. TESC Pond sizing calculations The total contributing area to the proposed sediment pond is approximately 1.37 acres. Per 1992 DOE section 11-5.8.7, the sediment pond is sized for the developed I 0-year / 24-hour design storm. I Discharge rate Q I Oyr/24fir 0. 5 3 cfs Surface Area (SA) S 'A = I.2XQIOyr/24hr/Vsed SA = 1.2 X 0.53 / 0.00096 Where Vsed is the settling velocity. = 663 Sqft 2. Sizing the De -watering Mechanism:. Principal Spillway (Riser pipe) The diameter shall be the minimum necessary to pass the pre -developed I 0-yr/24-hr �sign storm. Use Figure 111.2.38 Riser inflow curves (DOE) to determine this diameter I foot) Oyr�24hr predev) = 0.09 cfs �igure 111.2.38 of the DOE manual, the minimum riser diameter is 12 inches to ey this flow rate. gency Overflow Spillway meirgency overflow spillway shall convey the 100yr/24hr developed design storm. ,yr/24hr = 0.85 cfs )A Q I 00Yd/24hr 2.4 (H 2 )A 3.21 (H 3/2 0.85 -2.4(0.5)A 2 3.21 (0.5)A 3/2 0.15 feet. Use the minimum length of 6.0 feet. ,mum &amexa) Pea kve i0xI0NN*In% pnpa�xcjyv. J2 JO TgAJ/2 Ao Orifice area in square feet As Pond surface area in square feet H Head above the Orifice (height of riser in pipe) T De -watering Time (T = 24 hours) g Acceleration due to gravity 663 (2 x 3.5)A 1/2 10.6 x 3600 (24) (32.2)A 1/2 Ao 0.00034 Sqft Convert Ao to Diameter (D) in inches D = 24 x (Ao / 3.14)A 1/2 D = 0.25 inches. (Use I" minimum) Per the DOE design standards; the perforated pipe shall be a minimum of two inches larger than the Orifice sizes. Use 3-inch diameter for the perforated pipe. ,�diment pond shall be a minimum of 5-ft deep, which includes I -ft towards free d, 2-ft towards settling depth and I -ft towards sediment storage. Refer to the Iruction plans for more detail. A OV CONEN&NA iy be required and would be submitted at the time of construction 0 No. 4 - Control Structure/Flow Restrictor Wi n1tenaiwe- Q­ ...efeot Componi rit Wher tert�jice.ls N66ded [��4ill � Results Exo cted When Miih' nance General Trash and Debris (includes Sediment) Material exceeds 25% of sump depth or I foot below orifice plate. Control structure orifice Is not blocked. All trash and debris removed. Structural Damage Structure Is not securely attached to Structure securely manhole wall. attached to wall and outlet pipe. Structure is not in upright position (allow up to 10% from plumb). Structure In corre- ct position. Connections to outlet pipe are not watertight and show signs of rust. Connections to outlet pipe are water tight; structure repaired or replaced and works as designed. Any holes --other than designed holes —in the structure. Structure has no holes other than Cleano ! ut Gate Damaged or Missing Cleanout gate Is not watertight or is missing. designed holes. Gate is watertight and works as designed. Gate cannot be moved up and down by one Gate moves up and maintenance person. down easily and is watertight. Chain/rod leading to gate Is missing or damaged. Chain is In place and works as designed. Gate is rusted over 50%. of its surface area. Gate is repaired or replaced to meet design. standards. Plate Damaged or Missing control device is not working properly due to Plate Is in place and missing, out of place, or bent 0 e plate. rific plate. works as desigr Obstructions Any trash, debris, sediment, or vegetation. Plate is free of ail blocking the plate. obstructions and works as designed. Pipe Obstructions Any trash or debris blocking (or having . the Pipe is free of all potential of blocking) the overflow pipe. obstructions and works as designed. See " osed D4tention Systems" See *Closed Detention Systems" (No. 3). See "Closed (No. 3). Detention Systems" (No. 3). See "Catch Basins" (No. 5). 1 See "Catch Basins" (No. 5). I See "Catch Basins" — (No. 5). Volume V —Runoff Treatment BMPs 4-35 No. 5 — Catch Basins Maintenance [Wect Cdmponent OQF*04is When Maintenance W Need d EX e suits . PectedWhen Maintenance is.. General Trash & Trash or debris which Is located Immediately P rfo 6d. Debris in front of the catch basin opening or is blocking inletting capacity of the basin -by No Trash or debris located Immediately in front of More than 10%. catch basin or on grate opening. Trash or debris (in the basin) that exceeds 60 No trash or debris in the percent of the sump depth as measured from the bottom of basin to Invert of the lowest catch basin. lelpe into or out of the basin but In no case ss than a minimum Of six inches clearance from the debris surface to the invert of the lowest pipe. Trash or debris In any inlet or outlet pipe blocking more than 1/3 of its height. - Inlet and outlet pipes free of trash or debris. Dead animals or vegetation that could generate odors that could cause co 2 No dead animals or plaints or dangerous gases (e.g., methaneT vegetation p:resent within the catch Lbasin. Sediment Sediment (in the basin) that exceeds 60 percent of the sump depth as measured from No sediment in the catch the bottom of basin to Invert of the lowest basin pipe into or out of the basin, but in no case less than a minimum of 6 inches clearance from the sediment surface to the invert of the lowest pipe. Structure Damage to Top slab has holes larger than 2 square inches or cracks wider than 1/4 inch Top slab Is free of holes Frame and/or and cracks. Top Slab (intent is to make sure no material is running - Into basin). Frame not sitting flush on top slab, i.e., separation of more than 3/4 inch of the frame Frame is sifting flush on from the top slab. Frame not securely the riser rings or top slab and firmly attached. attached Fractures or Cracksin Maintenance person judges that strudture Is unsound. re Basin placed or . repaired Basin Walls/ to design standards. Bottom Grout fillat has separated or cracked wider than 112 Inch and longer than I foot at the Pipe is regrouted and joint of any Inlettoutlet pipe or any evidence of secure at basin wall. soil particles entering catch basin through cracks. Settlement/ Misalignment If failure of basin has created a safety, I function, or design problem. Basin replaced or repaired to design standards. Vegetation Vegetation growing across and blocking more than 10% of the basin No vegetation blocking opening. opening to basin. Vegetation growing In inlettoutlet pipe joints that is more than six Inches tall and less than No vegetation or ro Ot six inches apart. growth present. VolumeV—Runoff reatmentBws August 2001 No. 5 Catch Basins ent C C r= Is Needed Res Ults AXPected When 114intpnai.i.ce is performed' 7 Contamination and Pollution jNot Se See "Detention Ponds" (No. 1). No Pollution present. Catch Basin Cover Cover Not in Place 01 Cover is missing or only partially in place. Any open catch basin requires Catch basin cover is maintenance. closed Locking Me anis Mechanism Mechanism cannot be opened by one maj maintenance personwith proper tools. Bolts Mechanism opens with ot Wor Workimng !to into frame have less than 1/2 inch of thread. proper tools. Cover Difficult to Remove One maintenance person cannot remove lid after applying norm'al lifting pressure. Cover can be removed I by one maintenance person. (Intent is keep cover from sealing off access to maintenance.) Ladder� Ladd . er Rungs Unsafe Ladder Is unsafe due to missing rungs, not securely attached to basin wall, Ladder meets design misalignment, rust, cracks, or sharp edges. standards and allows maintenance person safe Metal Grates (If Applicable) Grate opening Unsafe I Grate with opening wider than 7/8 inch. access. Grate opening meets design standards. Trash and Debris Trash and debris that Is blocking more than 20% of grate surface inletting Grate free of trash and capacity. debris. Damaged or Missing. I Grate missing or broken member(s) of the grate. Grate is In place and meets design standards. - Debris Barriers (e.g., Tr ash Racks) mance Defect �nents Concittlon When Maintenance I's Needed Results Expected When Maintenance is Performed Tiash and Debris k8ars Trash or debris that Is plugging more than 20% of the openings In the barrier. Barrier cleared to design flow capacity. Damaged/ Missing Bars are bent out of shape more than 3 inches. 5 Bars in place with no bends more inch. than 3/4 I a / c Inlet/Outlet Pipe Bars are missing or entire barrier missing. Bars are loose and rust is causing 50% deterioration to any part of barrier. Debris barrier missing or not attached to pipe Bars in place according to design. Barrier replaced or repaired to design standards. Barrier firmly attached to pipe Volume V —Runoff Treatment BAP—s 4-37 No. 12 — Wetvaults Wintehance Mfect comporient General Trash/Debris Accumulation Sediment Accumulation in Vault Damaged Pipes Ac6ass Cover Damaged/Not Working Ventilation Vault Structure Damage - Includes Cracks in Walls Bottom, Damage to Frame and/or Top Slab Baffles Access Ladder Damage Copfton When Mahitenance is Needed Trash and debris accumulated In vault, pipe or inlettoutiet (includes floatables and non- floatables). Sediment accumulation in vault bottom exceeds the depth of the sediment zone plus 6-inches. Inlettoutlet piping damaged or broken and in need of repair._ Cover cannot be opened or removed, especially by one person. Ventilation area blocked or plugged. Maintenancefinspection personnel determine that the vault is not structurally sound. Cracks wider than 1/2-inch at the joint of any Inlettoutlet pipe or, evidence of soil particles entering through the cracks. Baffles corroding, cracking, warping and/or showing signs of failure as determined by mainteriancerinspection staff. er is corroded or deteriorated, not functioning properly, not attached to structure wall, missing rungs, has cracks and/or misaligned. Confined space warning sign missing. Results ExpectedVIlhen -MaInterianceis Performed Remove trash and debris from vault. Remove sediment from vault. Pipe repaired and/or replaced. Pipe repaired or replaced to proper working specifications. Bloc king material removed or cleared from ventilation area. A specified % of the vault surface area must provide ventilation to the vault Interior (see design specifications). Vault replaced or repairs made so that vault meets design specifications and is structurally sound. Vault repaired so that no cracks exist wider than 1/4-inch at the joint of the inlet/outlet pipe. Baffles repaired or replaced to specifications. 4adder replaced or repaired to specifications, and is safe to use as determined by inspection personnel. Replace sign warning of confined space entry requirements. Ladder and entry notification complies with OSHA standards. Volume V — Runoff Treatment BMPs 4-43 No. 18 — C2tchbasin Inserts IR Pefi6 Conditiom when -makdenanc0s Reiults'-Expected ften k3k"nan-ce -is Nil6rmed General Sediment Accumulation When sediment forms a cap over the insert media of the Insert and/or unit No sediment cap on the insert media and its unit. Trash and Debris Accumulation Trash and debris accumulates on insert unit creating a blockage/restriction. Trash and debri's removed from insert unit. Runoff freely flows into catch basin. Media Insert Not Removing Oil -Effluent water from media insert has a visible sheen. Effluent water from media insert Is free of oils and has no visible sheen. Media Insert Water Saturated Catch basin insert I's saturated with water and no longer has the capacity to absorb. Remove and replace media Insert. Media Ins ert-Oil Saturated Media oil saturated due to petroleum sp ill that drains into catch basin. Remove and replace media insert. Media Insert Use Beyond Normal Product Life Media has been used beyond the typical average life of media Insert product. Remove and replace media at regular InteNals, depending on insert product. Volume V —Runoff Treatment BMPs August 2001 , 4. zl� City of Edmonds Permit Application Form Form A Permit� Application for: E].1,NeW­Sin1gje Family Fj Interior Remodel El 6-arage/Carpott F] Pence n'Gra"ding cvds F] Tenant I m provement/Chainge'- of U.se' Rockery/Retaining WAR: Other (Specify). Brief Description: A6 Site Address: Sno County Tax AccCu -77'21 -3 4- Business/Tenant Name (if applicable): "�j s9z ew. Com/Apt E] Addition,.. epair Sion. E] Stdrage/Shed, Fl- Fire System, (Specify.:) DATE: GO-4 IA-L 6G)tLj>1^f(g (9U/L_D1/jC0 0()7__00?_ PROPERTY OWNER: A z1_ (--a- (S7; )m &,JD S L �L Suite # Mailing Address: -2-37?--:�;, 1 /2,� IL_ 1-i City:_ 6jo opti"-'ry State: tAJ14r Zip: I go 0-,(D Phone: (206) 542- -4-4-11 FAX: ( Z06 ) 5-4 ?-- (16 9-4-- E-Mail: 1&t(0_ 40JIMI- 60f, 43) 7Se a:s: ;P r /13 CONTRAC Mailing Address:_/"O� city Phone: (_) ,State: -Zip: FAX: (_) E-Mail: StjgF Fu n7be r, Exp: Date: n r -L- - THE RLy 1 11 S E7 APPLICANT/CONTACT: ElSame as Property Owner DSarne as Contrac Fill out the following information if "Other". Name & Mailing Address: 7m_^-nA-e;, A16 City:_ 5'7A7J0J0CD State: Phone: ( 6 2-1 — _27y 91�5_ M FAX: ( :56-0 ) 6 Zq — 5-*3 57' —Zip: 21 E-Mail: M4,t I-, Cov" L:\TEMP\BUILDING\WEBchecklists\SFR.COMM.APP.doc5/24/2007 J (),C ED Af C.d Kun CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS,WA 98020 PHONE: (425) 771-0220 - FAX: (425) 771-0221 C. C) BUILDING APPLICATION ACCEPTANCE Monday, December 17,2007 This Application has been accepted by the City of Edmonds for review. More information and changes may be required during this process. The review target date is: Monday, February 04, 2008 Your City Contact is: THERESAUMBAUGH Application Number: BLD20071258 Project Address: 23334 HIGHWAY 99, EDMONDS PROPEWINONNINER APPLICANT AZ @ EDMONDS LLC THOMAS THOMPSON AIA 23723 112TH PL W 29619 15TH AVE NE WOODWAY, WA 98020 STANWOOD, WA 98292 206-542-4411 360-629-3985 Vork Description: VEWCOMMERCL4L BUILDINGA )utstanding hems at Time of SubFWftal: I HEREBY ACKNOWLEDGETUATI HAVE READ THIS APPLICATION THATTHE INFORMATION GIVEN IS CORRECT M THE PROPERTY OWNER, OR THE DULY AUTHORIZED AGENTO F THEPROPERTY OWNER TO SIr ,KATURP(OWNER 0 R AGENT) PR[NTNAME DATESIGNED To view up to date information about your application please visit the City ofEdmonds Development Services website at ht1p.-11www.ci.edmonds.wa.us. ,21y7 g City of Edmonds Permit Application Form Form A Permit Ap plication-for: [],New,8ingle Family New Com/Apt: Ej Addition. Fl. Int6rior' Remodel EJ, parag6lCarport �,Repair Rsigm F-1 Fence E] Grading, cvds, F1 StbrageiShed Tenant 1-mprovement/Change,-.of.Use'' E] Fire Systbm'(Specify) F] Rbckery/Retaining Wall. tZ­17-07 n Other (Specify) DATE. Brief Description: 60 (L-%> f,,-J(a Site Address: 27-5-5 5 S- Suite # Sno County Tax Account Parcel #: e6 5-7G 7 0 0 c)o 2_0 0 12, Business/Tenant Name (if applicable): PROPERTY OWNER: A 9- 0- 1 fz,-- P m c � � 5, L L C Mailing Address: Z_ r3 TZ-5 /f Z , k1 City:_ (4joob e,� State: AM- zip: ft, zz . t FAX: 54-?- - T9 5-4— E-Mail: A�C 1<,404W Phone. CONTRACTOR: DSame as Property Owner 00ther (Name) Mailing Address: City: State: Zip: Phone: FAX: E-Mail: State License Number: Exp: Date: City Business License No: APPLICANUCONTACT. DSame as,Prooerty Owner � 0SameasContractor___,*Lher Fill out the following information if "Other". Name & Mailing Address: 7&_kvs1,A5 Tbwt.4,,,v5a-4 A-(4 Ole r? / 5-m- Ave- ^/�F City: Phone: !?7?4-^fW0&17D State: 144 Zip: Je2_q?_ FAX: (366 ) 4 E-Mail:- -6��(J^40e) (W 3 Ivi A-1 L', L:\TEMP\BUILDING\WEBchecklists\SFR.COMM.APP.doc5/24/2007 OV FD4 A�y CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS,WA 98020 PHONE: (425) 771-0220 - FAX: (425) 771-0221 Monday, December 17,2007 This Application has been accepted by the City of Edmonds for review. More information and changes may be required during this process. The review target date is: Monday, February 04, 2008 Your City Contact is: THERESAUMBAUCH Application Number: BLD20071259 Project Address: 23332 HIGHWAY 99, EDMONDS AZ @ EDMONDS LL.0 23723 112TH PL W WOODWAY, WA 98020 206-5424411 Work Descripfion: NEWCOMMERCL4L BUILDING B Outstanding Items at Time of Submittal: THOMAS THOMPSON A IA 29619 15TH AVE NE STANWOOD, WA 98292 360-629-3985 I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATIONTHATINE INFORMATION GIVEN IS CORRECT AND_ M THE PROPERTY OWNER, OR ]ME DULY AUTHORIZED AGENT OF THE PROPERTY OWNER TO SUBMITA BUILDING PERMIT APPLICATIO N TO THECITY. YJ A(A -S<NATU&Le( '0 WNER 0 R PRINTNAME DATESIGNED To view up to date infornwtion about your application please visit the City ofEdnionds Developtnent Services website at http.1Avww.ci.ednwnds.wa.us. City of Edmonds Permit Application Form Form A Permit Application for: E] New. Single Family lntdrioe,�Remodel' E] Gariag'e/'Carport Q Fence - - n Grad, i n,g , cvds E] Tenantlmptovement/Changd�oif Use�- Rockery/Retaining Wall Other (Specify) Brief Description: &14-- t OV 1) / Oc. 194 X New Co'm/Apt El Addition E] Repair F1 Sign n Storage/Shed El Fire System (Specify) 4-- 5 DATE: 12-W-6 ot L. OtU&S Site Address: 72 12 A 6 Suite # Sno County Tax Account Parcel M-00 5 7 G 70 ooO 000Z, Business/Tenant Name (if applicable): PROPERTY OWNER: L L, Mailing Address: 'Z-`3 7 Z3 7H City: W60 D &-PAIr State: 4J74 Zip: Phone: ( 706).54-2--4111 FAX: ( to (1 54 Z- CONTRACTOR: Mailing Address:_ City: Phone: E]Same,as Property Owner 00ther (Name) A07- I,C--r State Ucense Number: State: FAX: (_) No= E-Mail:-,P&Zd Cam ,Zip: E-Mail: Exp: Date: City Business License No: APPLICANT/CONTACT: DSame,as PropertV Owner OSame as.Contractor ____xother Fill out the following information if "Other". Name & Mailing Address: -7W61P5�011 A14- ;7,16 N ("Tt"t City:- S-72�WC)61�� State: . 6VA-. zip, YJPZ ?Z- Phone: _6 1-7 �'5 Ig!;;7 FAX: 54-5:5-- E-Mail: 6tSIVAA.&O (�"- eM4(L, Ca4l v L:\TEMP\BUILDING\WEBchecklists\SFR.COMM.APP.doc5/24/2007 CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS,WA 98020 PHONE: (425.) 771-0220 - FAX: (425) 771-0221 Monday, December 17,2007 This Application has been accepted by the City of Edmonds for review. More information and changes may be required during this process. The review target date is: Monday, February 04, 2008 Your City Contact is: THERESAUMBAUGH Application Number: BLD20071260 Project Address: 23-3 )3 )0 HIGHWAY 99, EDMONDS AZ @ EDMONDS LLC 23723 112TH PL W WOODWAY, WA 98020 206-542-4411 Work Description: NEWCOMMERCL4L BUILDING C Outs tanding hems at Time of S ubinittal: THOMAS THOMPSON AIA 29619 15TH AVE NE STANWOOD, WA 98292 360-629-3985 I HEREBY ACKNOWLEDGETHAT I HAVE READ IMIS APPLICATION'MATIME INFO RMATION GIVEN IS CORRECT AND THAT I AM THEPROPERTY OWNER, OR THE DULY AUTHORIZED AGENTO FTHE PROPERTY OWNER TO BUILDING PERMIT APPLICA'nO N TO THECITY. -7- -tfLi.. - A-i , , , , i Aj.A 9 r7—,n-7 (OWNER OR AGE" To view up to date information about your application please visit the City ofEdmonds Development Services website at http://www.ci.ednwnds.wa.us. RISIESUR JUN 23 2008 �tE ,�T �jr 22703 8113 227091 22710 22710 22717 22712 W 0 22708 22711 > 22715" 1 < .7 ' 6 72 22716 8109 7928 1 22711 07 8231 22716 22720 .71�7 22716 2272V 2727 6227 22730 ;7 22728 76,9 21711 �7, 7619 > PA H ST sW-- T T�. CP -1 1W 4 17- o 9 o 0' - -4 22807 -77 228W 22.7 ate T 8,5 22815 an 79207----- 7 Lumber 1 8130 22815 8211 22821 L. D. S. 22908 22910 22M� 22904 2 22905 8224 1 22829 Church a207 22904 22903 412! �9LTMST : �22910 cO 22911 v) 22903 _91 22a28 W12 22912 8021 22911 1 0 '0 229W/ :: 0- Ar 22911 ::n9l: 22918 IL 22917 Conquest 4F 22921 1 22917 Z a2ll U) — Center 8W5 � '. '. 1. N . 8127 8107 Brentwood Plaza 22925 23)TH ST SW 23007 23008 W 23007 8M 8204 > — T 8 2 R Spray' o o .5 23013 23014 .3: 23015 23010 23011 King 23005 — LU — 23019' 23020 > 23021 — — 23022 1823014 15 230 L 4 :L- —1 < 23020 2302t — — I . . ZD 23017 23023 23024 '6 23010 A,4, 23027' 23028 Er: 23m 6 9 2303 �-4 23030 - Public Storage 2W21 Lu 23029 2. 2.1, 23101 23102 23103 32 3030 231 23104 23107 23108 23109 b 23107 23122 23103 Z — 23110 23116 23114 North Side 23115; 23116 23117 23115 - Sunset Villa 24+" 23116 2310 23121 23122 23123 23300 23117 23129 5 15Y 23130 231 23131 .1 23201 2321 4,2%s 21 23221 23221 23225 M.11 st s --H-H9 80 23231' 23305 '5 — 2W25 :�323 =3 23304 3 23231 23307 23315 233t2 23315 8129 23319 80 23311 — 23323 233.-1 23320 8121 23U7 Alp 233�.S 23316 �Z Ha 1 a 8117 0034_4044 a 8230 2UI91 8300 2342 8123 W06 8121 Christ Lutheran 0 Church Park Edmonds Apartments 23525 23515 PEA &Ride 0 �23 1 23rOl 60 23603 ,236 5 0 23607 :-:23619 Safeway 23632 236. 41 23129 I bvv 23205 23215 23215 23207 23217 23225 T709 A,. 233D5 23307 D Plj�- 233(Y 7711 > 23311 Uj 23329 7811 31 ej. 2=5 TS 23329 23406 23406 7712 23402 234M 2U12 23411 — T710 23418 Uj 23417 23414 7708 23422 23421 23431 23428 7706 22 23432 23439 — 7727 235M 23440 7919 — T725 23513 7925 23514 23"6 1. 23530 7929 23450 2351 23456 7515 236TH ST SW 7918 3: 1,% 7710 23602 23601 7604 — ui 236D, > < 23614 46 M: 361 23604 23603 236 23606 23605 23620 20 23621 — \D6 3 F6 2 3626\ 02 23628 3628 TREET FILE] PLANNING DATA F15� New Commercial / Multi -Family Projects ,�V Name: Date: Site Address: :?,,--7 Plan Check It: BLD 2 2-3 -7- Project Description: Mew ;P_R,4A,4,f -,e- > r, > Use(s) Proposed.- Allowed Us rT�O) CUP File Number- To Allow What Uses: Legal Nonconforming Land Use Determination Issued y(YES�NO) Reduced Site Plan Provided: (YES NO) OF Anation: Map Page: p Plan De Corner Lor- (Y�ES) NO) lafj LoVA(A) 14,, 6,69. a ADB FiI6 Number (date waived):. A Plans Match ADB Approved Critical Areas Determi �<Study Re ' e El Waiver SEPA Determinati El Exempt ><! Needed (for sites with 500 cubic yards of grad with 2 0 feet of Puget Sound or Lake Ballinger. Requires: (1) Fee, (2) Environmenta%l JOcklist, (3).APO List with notarized form). lo? 14"ASeAfae4 Require cks t e ide- 0 i : r (1:7- 9.1) +0P P-WM %.- qqxv� tbacks :;��44A 54-r4j Street: V I Side: e: Lot Coverage/FAR Required: overage/FAR Provided: W .0-- Lot Coverage/FAR Calculations: Building Height Datum Point: Datum Elevation: Maximum Height: I Actual Height - Subdivision: Lot Aggregation Required: 4x ace-+ *�, k4t+ te.'J'Q F Ace st Landscaping Landscaping Matches ADO Approved: Land caping Bid Provided: (YES I NO) Bond Amount (100% Bid): Plan Review By: V, f PLANNING DATA New Commercial I Multi -Family Projects T FILE I E�� Commercial Parking Analysis Business Name �1 Type/Use — Parking Ratio Tenant Area Required Parking r&-b4 I '. t qOX rot, a I �jr,�inj d.- R,�Wulr'e 7�7 -V Pa rk ILng;Prf �,Vid:e! �.'. P I '. V 41 * ? , � - V -- 01, - I 1.&, .16 g 'A '? ,.-,sfiYltiiFairyilyPa',-kingA�7dI /*S Required # Bedrooms per Dwelling Unit �V,!, Park'Ing Ratio # Units Parking Studio 1.2/D.U- _�5/1).0 ol 1 Bedroom i .� 2 Bedrooms 1.8 4. 3 + Bedrooms _.,,�2. 0 D. U. Total Parking Re�red.- /00_� TOIJI,Parking Provided.' Plan Review By: ��h leeO�� J, ;v" .10, RESUB JUN 2 3 2008 May 1, 2008 Blaine Chesterfield, Engineering Division City of Edmonds RE: I st Review Responses for A2@EDMONDS (#20071258, 1259 and 1260) dated January 09, 2008. Dear Blaine, I have revised the attached plans based on your review comments. The review comments are numbered on the letter and have been addressed as follows: I We have added NPDES from DOE under Other Permits. We will obtain the permit during the review process. 2. Sizing calculations has been added to the report and shown on the TESC plans too. 3. Updated the design per the rainfall data from City of Edmonds. 4. Will inquire and apply from ISGP if needed. Please call if you have questions. Sincerely, Brian Kalab, PE 3630ColbyAve * Everett,WA 98201 * Phone:. (425) 303-9363 Fax: (425) 303-9362 # Email:info@insightengineering.net CITY C T h o rn a s T h o rn p s o n A I A May 30, 2008 Theresa Umbaugh Senior Permit Coordinator City of Edmonds 1. 21 5th Ave North Edmonds, WA 98020 RE: Plan Check BLD2007-1258-1259 & 1260 RETAIL BLDGS Dear Ms. Umbaugh: B jUN 2 3 2008 "W&V00'TUr We herewith present our re -submittal of drawings and related matters to address the comments raised by the city most recently on April 30, 2008, some of which had not previously been shared with us. The documents have been or will be delivered under separate cover by the Owner. In any event, please accept this as our written response, as well. Jan 4/08 letter from John Westfall, Fire Marshall: 1 . To be responded to by Civil. 2. Loading areas are not required for each individual building. 3. Site plans have been updated accordingly. 4. Title Sheet has been updated accordingly. 5. Title Sheet has been updated accordingly. 6. Title Sheet has been updated accordingly. 7. Title Sheet has been updated accordingly. 8. Title Sheet has been updated accordingly. 9. Elevation Sheets have been updated accordingly- 10. Floor Plans have been updated accordingly. - - Jan 2/08 transmittal of plan review from Linda McMurphy, Public Works: To be responded to by Civil. Jan 9/08 transmittal of plan review from Blaine Chesterfield, Engin To be responded to by Civil. Jan 22/08 plan review from Jon Lein of Wastewater Treatment: To be responded to by Civil 29619 15 1 h Avenue NE, Stanwood, WA tsci(cDatt.net cell: 206-409-0755 phone: 360-629-3985 fax 98292 qcEgUED JUL 0 3 2008 EECE 360-629-5435 Feb 20/08 plan review letters (both) from Jeanie McConnell, Engineering: To be responded to by Civil. Feb 4/08 plan review comments for Building A from Ann Bullis, Building: I bldg code classifications have been changed so that all buildings are categofted as Groups M and B allowing for some leasing flexibility. Given parking needs it's unlikely that a food use would need to be more than Group B. In any case, the Tenant Improvement Permit review will cover tenant specifics of restrooms, etc and other code related items. This is the industry standard approach for multi -tenanted commercial bldgs of this nature. 2. All requisite notations have been made throughout 3. Only Building B is sprinkled. 4. Floor areas corrected on TO.]. 5. Addresses modified on all sheets. 6. As these are multi -tenant buildings, the convention is to designate the possible suite breakup, documents show this. 7. Shown on the plans. 8. Shown on the plans. 9. Deferred to tenant improvement permits, however no tenant space proposed requires a drinking fountain unless floor areas increase. 10. Not on plan for electrical design build to provide to code. 11. To be provided by the Owner. 12. Corrections made. 13. Forms for all three buildings provided., 14. Window and Door information to code provided. 15. On the plans. 16. Details correctly flagged. 17. Correct, as is. 18. Done 19. Done. 20. More info added. 21. By Owner. 22. By Owner. 23. By Owner. 24. See details on plans. 25. See details on plans. 26. See details on plans. 27. See details on plans. 28. See details on plans. 29. Sheet revised. 30. Notes made on the plans. 31. See structural and sheet TO. 1, Form by Owner. 32. By Owner. from City Consultant: 1. omit 2. Only Bldg B requires Spinklers. 3. Done. 4. Critical Occ Load not reached. 5. Omit 6. Done. 7. Shown. 8. Done. 9. Done. 10. Done. 11. Done. 12. Done. 13.' Done. See Structural Engineer's Response Letter. Feb 5/08 plan review comments for Building B from Ann Bullis, Building: 1 . A2 use deleted, Bldg designed for Groups M and B. 2. Done. 3. Sprinkled. 4. Done. 5. Done. 6. Done. 7. Corrected. 8. Done. 9. See Response Bldg A. 10. Done. 11. Done 12. Done 13. Not required unless T.I. exceeds Occ. Load. 14. Reference to Elect Design Build. 15. By Owner. 16. Done 17. Done. 18. Done. 19. Done 20. Done. 21. Done 22. Done 23. Done. 24. Done. 25. By Owner. 26. By Owner. 27. By Owner. 28. Done. 29. Done 30. Done. 31. Done. 32. Done. 33. Done. 34. Form by Owner. Notes on Arch and Structural plans. 35. By Owner. A a from City Consultant: 1. omit 2. Only Bldg B requires Spinklers. 3. Done. 4. Critical Occ Load not reached. 5. Omit 6. Done. 7. Shown. 8. Done. 9. Done. 10. Done. 11. Done. 12. Done. 13. Done. See Structural Engineer's Response Letter. Feb 5/08 plan review comments for Building C from Ann Bullis, Building: 36. A2 use deleted, Bldg designed for Groups M and B. 37. Done. 38. Sprinkled. 39. Done. 40. Done. 41. Done. 42. Corrected. 43. Done. 44. See Response Bldg A. 45. Done. 46. Done 47. Done 48. Not required unless T.I. exceeds Occ. Load. 49. Reference to Elect Design Build. 50. By Owner. 51. Done 52. Done. 53. Done. 54. Done 55. Done. 56. Done 57. Done 58. Done. 59. Done. 60. By Owner. 61. By Owner. 62. By Owner. 63. Done. 64. Done 65. Done. 66. Done. I A 67. Done. 68. Done. 69. Form by Owner. Notes on Arch and Structural plans. 70. By Owner. from City Consultant: 14. omit 15. Only Bldg B requires Spinklers. 16. Done. 17. Critical Occ Load not reached. 18. Omit 19. Done. 20. Shown. 21. Done. 22. Done. 23. Done. 24. Done. 25. Done. 26. Done. I See Structural Engineer's Response Letter. Jan 31, 08lplan review from Kathleen Taylor, Planning: 1. Sheet revised. 2. See plans 3. Design Review: a. Color elevations provided., b. Site Lighting to be provided by Owner. c. Fee by Owner. d. C-1: 1. Building massing and unit layouts are different between all three bldgs. 2. Building's are sited differently relative to setbacks, and property line orientations. 3. Building's are sited differently relative to adjacent buildings. 4. Open spaces (landscaped spaces) are varied throughout the site. 5. Exterior materials are uniform to unify visual scheme. C-2: 1 . Bldgs have individual entries as each has different floor plans. 2. Building Forms are different, with similar vocabulary. 3. Building plans are different to create variety. 4. Buildings are of different sizes and orientations. Trash enclosure: Plans show 6ft high screen walls to city dimensions c/w gates. Kroof is not provided, nor necessary. 4. Landscaping: Landscaping changes have been made. 5. Pedestrian Walkways are shown on the Plans. Painted linework complies with City code. t 6. Height calculations show on the site plan. 7. owner to provide SEPA. 8. Owner to provide Critical Area Determination form. 9. Owner to combine parcels. 10. No response needed. This package contains the correct. Energy Compliance forms. The Owner will process the Special Inspection form at time of permit pickup. The Owner will coordinate the General Contractor information requested when that decision has been reached. The structural and civil revisions are also included and sets of documents attached. The structural engineer's response letter is also included. The Owner, whose name this permit is under, has been advised to apply for an extension, however it is unclear if that is essential if we are still under review. If we are in error and some formal method of request is needed and not being supplied by the Owner, please notify the undersigned. We consider the submission of these revised plans constitute our re -submittal. All comments we believe have been addressed on the plans. I Should there be anything further please advise accordingly Sincerely, Thomas Thompson AIA c/c Pat Morris RESUB JUN � 3 2008 r t 1-i- nr -le M M May 1, 2008 Linda McMurphy, Public Works Department City of Edmonds RE: I st Review Responses for A2@EDMONDS (#2007125 8, 1259 and 1260) dated January 02, 2008. Dear Linda, I have revised the attached plans based on your review comment. The review comment has been addressed as follows: I Premize isolation with a (RPBA) Reduced Pressure Backflow Prevention Assembly has been provided at meter in hot box. Please call if you have questions. Sincerely, z" ��Z/ Brian Kalab, PE 3630 Colby Ave * Everett, WA 98201 * Phone: (425) 303-9363 Fax: (425) 303-9362 * Email:info@insightengineering.net RESUB CITY COPY JUN 23 2008 Bl� t" 1, S' I*" C)FS%�N May 1, 2008 John Westfall, Fire Marshall City of Edmonds RE: I st Review Responses for A2@EDMONDS (#20071258, 1259 and 1260) dated January 04, 2008. Dear John, I have revised the attached plans based on your review comment. The review comments have been addressed as follows: I CIVILS: OVWD detail has been provided on water and sewer plan. A note to upgrade FH steamer ports as required has been provided. 2. Architect to address. 3. Architect to address. 4. Architect to address. 5. Architect to address. 6. Architect to address. 7. Architect to address. 8. Architect to address. 9. Architect to address. 10. Architect to address. Please call if you have questions. Sincerely, ;V"— ��4z Brian Kalab, PE 0 3630 Colby Ave * Everett, WA 98201 * Phone: (425) 303-9363 Fax: (425) 303-9362 * Email:info@insightengineering.net 4 A 4 t (1, S, Ii nm May 1, 2008 Jeanie McConnell, Engineering Program Manager City of Edmonds jp JUNI 23 2008 E%R� &_Vjj�SA'�rr MONWff RE: I st Review Responses for A2@EDMONDS (#2007125 8, 1259 and 1260) dated February 20,2008. Three sets of revised plans or documents have been submitted with a written response to each of the items below. Since there are too many changes on the plans, clouds were not provided. One set of all plans are wet -signed. Dear Jeanie, I have revised theattached plans based on your review comments. The review comments are numbered on the letter and have been addressed as follows: General: I . Tom to address 2. Tom to address 3. Tom to address 4. Tom to address 5. Tom to address C2 - TESC and GradinE Plan: I . Details have been added to Sheet C3. 2. Construction entrance has been terminated at the private property. 3. We are proposing a one-way access for the vehicles during construction with a rock construction loop. 4. The outfall is tight lined. 5. Done. See plans. 6. See Sheet C2 for a demo plan. 7. Done. 8. Notes have been revised. 9. TESC notes added. C3 - Road and Drainne Plan: I We have re -surveyed the storm system and found that there is drainage flowing onto the site from the north as well as from the west. These are closed conveyance systems and we are proposing to bypass the flows to the downstream course. 2. See revised plans. 3. See revised plans. 3630 Colby Ave * Everett, WA 98201 # Phone: (425) 303-9363 Fax: (425) 303-9362' # Email:info@insightengineering.net -Z� t It S T b 4. We have revised the invert elevations to address this comment. See revised plan. 5. The pipe is RCP and shall not be replaced. 6. There are two accesses proposed. One is a 5'x 10' grated access door at the outlet and a 24-inch opening at the inlet. 7. It meets water quality requirements for EMS 18.30.060.13 and 1992 DOE. 8. See revised plans for Driveway access and curb ramps. 9. See revised plans for the curb ramp. 10. See revised plans. 11. See revised plans. 12. Done. 13. Added note to relocate power pole. 14. Added note to repaint the fog line. 15. See attached retaining wall design. 16. Done. 17. Wall drain is shown on the plans. C4 - Detention Plan: 1. The detention Vault plan has been revised. C5 - Water and Sewer Plan: 1. The sewer/water plan has been submitted to OVWSD for review. We will submit copies upon approval. Please call if you have questions. Sincerely, /Irian KZaIab, �PE 3630 Colby Ave # Everett, WA 98201 # Phone: (425) 303-9363 Fax: (425) 303-9362 # Email:info@insightengineering.net 4 n � May 1, 2008 Blaine Chesterfield, Engineering Division City of Edmonds RE: 1 st Review Responses for A2@EDMONDS (#20071258, 1259 and 1260) dated January 09, 2008. Dear Blaine, I have revised the attached plans based on your review comments. The review commen'ts are numbered on the letter and. have been addressed as follows: I We have added NPDES from DOE under Other Permits. We will obtain the permit during the review process. 2. Sizing calculations has been added to the report and shown on the TESC plans too. 3. Updated the design per the rainfall data from City of Edmonds. 4. Will inquire and -apply from ISGP if needed. Please call if you have questions. Sincerely, J, � 4/� Brian Kalab, PE 3630 Colby Ave # Everett, WA 98201 * Phone: (425) 303-9363 Fax: (425) 303-9362 # Email:info@insightengineering.net May 1, 2008 Linda McMurphy, Public Works Department City of Edmonds RE: I st Review Responses for A2@EDMONDS (#20071258, 1259 and 1260) dated January 02, 2008. Dear Linda, I have revised the attached plans based on your review comment. The review comment has been addressed as follows: 1. Premize isolation with a (RPBA) Reduced Pressure Backflow Prevention Assembly has been provided at meter in hot box. , Please call if you have questions. Sincerely, Brian Kalab, PE 3630 Colby Ave * Everett, WA 98201 # Phone: (425) 303-9363 Fax: (425) 303-9362 # Email:info@insightengineering.net T- May 1, 2008 John Westfall, Fire Marshall City of Edmonds RE: I st Review Responses for A2@EDMONDS (#2007125 8, 125 9 and 1260) dated January 04, 2008. Dear John, I have revised the attached plans based on your review comment. The review comments have been addressed as follows: I CIVILS: OVWD detail has been provided on water and sewer plan. A note to upgrade FH steamer ports as required has been provided. 2. Architect to address. 3. Architect to address. 4. Architect to address. 5. Architect to address. 6. Architect to address. 7. Architect to address. 8. Architect to address. 9. Architect to address. 10. Architect to address. Please call if you have questions. Sincerely, 10'A// - Brian Kalab, PE 3630 Colby Ave * Everett, WA 98201 * Phone: (425) 303-9363 Fax: (425) 303-9362 # Email:info@insightengineering.net rry T h o rn a s T h o rn p s o n May 30, 2008 Theresa Umbaugh Senior Permit Coordinator City of Edmonds 121 5th Ave North Edmonds, WA 98020 RE: Plan Check BLD2007-1258-1259 L 1260 RETAIL BLDGS Dear Ms. Umbaugh: RESUR 4"Opy jUN 28 2008 A I A We herewith present our re -submittal of drawings and related. matters to address the comments.raised by the city most recently on April 30, 2008, some of which had not previously been shared with us. The documents have been or will be delivered under separate cover by the Owner. In any event, please accept this as our written response, as well. Jan 4/08 letter from John Westfall, Fire Marshall: I . To be responded to by Civil. 2. Loading areas are not required for each individual building. 3. Site plans have been updated accordingly. 4. Title Sheet has been updated accordingly. 5. Title Sheet has been updated accordingly. 6. Title Sheet has been updated accordingly. 7. Title Sheet has been updated accordingly. 8. Title Sheet has been updated accordingly. 9. Elevation Sheets have been updated accordingly. 10. Floor Plans have been updated accordingly. Jan 2/08 transmittal of plan review from Linda McMurphy, Public Works: To be responded to by Civil. Jan 9/08 transmittal of plan review from Blaine Chesterfield, Engineering: To be responded to by Civil. Jan 22/08 plan review from Jon Lein of Wastewater Treatment: To be responded to by Civil 29619 15 t h Avenue NE, Stanwood, WA 98292 tsq(cDatt.net cell: 206-409-0755 phone: 360-629-3985 fax: 360-629-5435 �eb 20/08 plan review letters (both) from Jeanie McConnell, Engineering: To be responded to by Civil. Feb 4/08 plan review comments for Building A from Ann Bullis, Building: 1 . bIdg code classifications have been changed so that all buildings are categorized as Groups M and B allowing for some leasing flexibility. Given parking needs it's unlikely that a food use would need to be more than Group B. In any case, the Tenant Improvement Permit review will cover tenant specifics of restrooms, etc and other code related items. This is the industry standard approach for m.ulti-tenanted commercial bldgs of this nature. 2. All requisite notations have been made throughout 3. Only Building B is sprinkled. 4. Floor areas corrected on TO. 1. 5. Addresses modified on all sheets. 6. As these are multi -tenant buildings, the convention is to designate the possible suite breakup, documents show this. 7. Shown on the plans. 8. Shown on the plans. 9. Deferred to tenant improvement permits, however no tenant space proposed requires a drinking fountain unless floor areas increase. 10. Not on plan for electrical design build to provide to code. 11. To be provided by the Owner. 12. Corrections made. 13. Forms for all three buildings provided., 14. Window and Door information to code provided. 15. On the plans. 16. Details correctly flagged. 17. Correct, as is. 18. Done 19. Done. 20. More info added. 21. By Owner. 22. By Owner. 23. By Owner. 24. See details on plans. 25. See details on plans. 26. See details on plans. 27. See details on plans. 28. See details on plans. 29. Sheet revised. 30. Notes made on the plans. 31. See structural and sheet TO. 1, Form by Owner. 32. By Owner. from City Consultant: I . omit 2. Only Bldg B requires Spinklers. 3. Done. 4. Critical Occ Load not reached. 5. Omit 6. Done. 7. Shown. 8. Done. 9. Done. 10. Done. 11. Done. 12. Done. 13. Done. See Structural Engineer's Response Letter. Feb 5/08 plan review comments for Building B from Ann Bullis, Building: 1 . A2 use deleted, Bldg designed for Groups M and B. 2. Done. 3. Sprinkled. 4. Done. 5. Done. 6. Done. 7. Corrected. 8. Done. 9. See Response Bldg A. 10. Done. 11. Done 12. Done 13. Not required unless T.I. exceeds Occ. Load. 14. Reference to Elect Design Build. 15. By Owner. 16. Done 17. Done. 18. Done. 19. Done 20. Done. 21. Done 22. Done 23. Done. 24. Done. 25. By Owner. 26. By Owner. 27. By Owner. 28. Done. 29. Done 30. Done. 31. Done. 32. Done. 33. Done. 34. Form by Owner. Notes on Arch and Structural plans. 35. By Owner. from City Consultant: 1. omit 2. Only Bldg B requires Spinklers. 3. Done. 4. Critical Occ Load not reached. 5. Omit 6. Done. 7. Shown. 8. Done. 9. Done. 10. Done. 11. Done. 12. Done. 13. Done. See Structural Engineer's Response Letter. Feb 5/08 plan review comments for Building C from Ann Builis, Building: 36. A2 use deleted, Bldg designed for Groups M and B. 37. Done. 38. Sprinkled. 39. Done. 40. Done. 41. Done. 42. Corrected. 43. Done. 44. See Response Bldg A. 45. Done. 46. Done 47. Done 48. Not required unless T.I. exceeds Occ. Load. 49. Reference to Elect Design Build. 50. By Owner. 51. Done 52. Done. 53. Done. 54. Done 55. Done. 56. Done 57. Done 58. Done. 59. Done. 60. By Owner. 61. By Owner. 62. By Owner. 63. Done. 64. Done 65. Done. 66. Done. I . r . 67. Done. 68. Done. 69. Form by Owner. Notes on Arch and Structural plans. 70. By Owner. from City Consultant: 14. omit 15. Only Bldg B requires Spinklers. 16. Done. 17. Critical Occ Load not reached. 18. Omit 19. Done. 20. Shown. 21. Done. 22. Done. 23. Done. 24. Done. 25-Done. 26. Done. See Structural Engineer's Response Letter. i Jan 31, 08 plan review from Kathleen Taylor, Planning: 1. Sheet revised. 2. See plans 3. Design Review: a. Color elevations provided., b. Site Lighting to be provided by Owner. c. Fee by Owner. d. C-1: 1. Building massing and unit layouts are different between all three bldgs. 2. Building's are sited differently relative to setbacks, and property line orientations. 3. Building's are sited differently relative to adjacent buildings. 4. Open spaces (landscaped spaces) are varied throughout the site. 5. Exterior materials are uniform to unify visual scheme. C-2: 1 . Bldgs have individual entries as each has different floor plans. 2. Building Forms are different, with similar vocabulary. 3. Building plans are different to create variety. 4. Buildings are of different sizes and orientations. Trash enclosure: Plans show 6ft high screen walls to city dimensions c/w gates. A roof is not provided, nor necessary. 4. Landscaping: Landscaping changes have been made. 5. Pedestrian Walkways are shown on the Plans. Painted linework complies with City code. 6. Height calculations show on the site plan. 7. Owner to provide SEPA. 8. Owner to provide Critical Area Determination form. 9. Owner to combine parcels. 10. No response needed. This package contains the correct Energy Compliance forms. The Owner will process the Special Inspection form at time of permit pickup. The Owner will coordinate the General Contractor information requested when that decision has been reached. The structural and civil revisions are also included and sets of documents attached. The structural engineer's response letter is also included. The Owner, whose name this permit is under, has been advised to apply for an extension, however it is unclear if that is essential if we are still under review. If we are in error and some formal method of request is needed and not being supplied by the Owner, please I hotify the undersigned. We consider the submission of these revised plans constitute our re -submittal. All comments we believe have been addressed on the plans. Should there be anything further please advise accordingly Sincerely, Thomas Thompson AIA �/c Pat Morris sr!'11- IF XOV."IrA KOSNIK ENGINEERING, PC A P r o F e s s i o ti 3 1 S c �j i ce s C o r p o r a t i o ?i May 29, 2008 Mr. ' Thomas Thompson AIA 296 19 15TH Ave NE Stanwood, WA 98292 Ref. Edmonds Commercial Development; KE project no K-07-034 Dear Tom: RESUB JUN 2 3 2008 "LW'9WdORTNWW The following is our response to the City of Edmonds' plan review comments relayed in your email dated May 13, 2008. All significant revisions/additions to our drawings have been clouded. General 15. The calculation on sheet C-2 applies to the walls at the roof features where they are platform framed. The top of wall was taken as 15% 1 1'minus the depth of the truss at 1'-4" giving us a height of 14.58ft. Also the calc uses a stud spacing of 16", which we revised to 12" for the construction documents. Building A & B already call for a 12" stud spacing. Building C has been revised from a 16" spacing to a 12" spacing. I have attached a sheet C-2A for the condition where the wall is balloon framed and the height is 16ft and the wall load above reduced to 40plf. The wall studs stud spacing of 12"o/c is ok. See response under sheet S3.3 for intermediate studs. Sheet S2.1: Foundation & Roof Plans 16. Plan keynotes have been revised to correctly reference detail I O/S3.2. as follows: Building A &C sheet S2.1 keynote 22 Building B sheet S2.1 keynote 21 18. This comment applies only to building A as the roof framing plan for buildings B and C are correct. The keynotes and roof framing plan have been revised to clarify the locations of the 12"o/c roofjoist spacing below the wall framing for the roof feature above. Sheet 3.2: Details 18. A review' of the parapet stud capacity and anchorage is attached on sheet C-6. Details 10 and 11/§3.2 have been clarified to reflect the use of the LSTA24 strap tie at 48"o/c for both details. 19. This detail applies to the high roof attachment to the perimeter walls. at the high roof feature. I have attached a calculation sheet D- 19, which addresses this shear transfer. The actual shear transfer force is 11 9plf on the short end walls. The exception to this is the center wall on building C where we have added a detail 6A/S3.2 to call for A34 @ 12"o/c. 1051, 19TH Ave SE, Suite C, Everett, WA 98208 * (425) 357-9600 (phone) * (425) 357-9622 (fax) ANNIFLE] 30riw] KOSNIK ENG I NEER ING, PC Sheet S3.3: Details 20. intermediate studs have been clarified in detail A/S3.3 for buildings A, B and C. Sheet C4: Detention Plan 21 & 22. The vault design was completed and issued on 04-28-08 and were to have been submitted at that! time. We are providing a copy of these plans and calculations in response to your review comments requesting our design and construction drawings. We itrust this information adequately addresses the comments. If you should have any questions, or require additional information, please give us a call. Sincerely, Daniel Kosnik, PE President Enclosures; 3 pages of structural calculations I 10511 19TH Ave SE, Suite C, Eyereft, WA 98208 * (425) 357-9600 (phone) * (425) 357-9622 (fax) KOSNIK ENGINEERING Project: Edmonds Commercial sheet: 10511 19th Ave SE, Suite C date: Everett, WA, (425)-357-9600 prj. no. K-07-034' STUD WALL DESIGN PERIMETER WALLS WALL HEIGHT & LOADS STUD DATA MATERIALS clear height L= 16.00 ft stud size 2x6 species= doug fir (clear height inches) 192 in breadth b= 1.5 grade= No. 2 wall DL = 20 psf depth d= 5.5 in E= 1.60E+06 psi roof tributary width 20 ft Area A= 8.25 in2 Fb= 850 psi roof TL 32 psf Section modulus S= 7.563 in3 Fc= 1400 psi Wall load above 40 plf Mom of Inertia I= 20.8 in4 Emin= 5.80E+05 psi Wall vertical load W= 1000 plf Wall lateral load P= 16 psf ADJUSTMENT FACTORS Stud Spacing S= 12 i n Fb Fc E Size CF = 1.30 1.10 na Stud vertical load P= 1000 lbs/stud Repetitive Use Cr = 1.15 na na Stud lateral load W= 16 plf Load Duration CD= 1.60 1.15 na Wet Service CM 1.00 1.00 1.00 buck length coeff Ke= 1.00 eff col length le= Ke(L)= 192 in, slender ratio le/d= 34.9 < 50 ALLOWABLE STRESSES Allow Bending Stress F'b = Fb(CO(Cr)(Cd)(Cm) 2033 psi Fce= 391 coeff c 0.8 sawn lumber E'min = Emin(Cm) 5.80E+05 adjusted comp Fc* Fc(Cq(Cd)(Cm) (psi) 1771 ratio Fce/Fc* 0.22 C1= 0.76 column stability factor Cp = 0.21 Allow Comp Stress F'c=CpFe (psi) 371 psi Pallow 3065 lbs/stud Axial Load is O.K. ALLOWABLE COMPRESSIVE STRESSES 0 1 HR FIRE WALL Allowable stress not to exceed 0.78(F'c) w/ le/d = 33: Fce= 438 adjusted comp Fc* = Fc(CO(Cd)(Cm) (psi)= 1771 ratio Fce/Fc* 0.25 C1= 0.78 CP= 0.23 Allow comp F'c=CpFc* = 413 psi Allowable comp stress = 290 psi Pallow =' 2391 lbs/stud Axial Load is O.K. WALL PLATE BEARING CAPACITY Comp perp to grain Fc = 625 psi Bearing Area Factor Cb 1.00 Allow Comp F'c = 625 psi Plate Bearing Capacity is O.K. BEAM -COLUMN INTERACTION CHECK Compressive Stress fc 121 psi Bending Stress fbx = 812 psi Amplification Factor = 1.45 Interaction for Non -Rated W 1: (fc/F'c)2 + Amp(fbx/F'bx) = 0.69 Interaction for I hr Wall: (fc/F'c)2 + Amp(fbx/F'bx) = 0775 -4- REcEIVEL) JUN - 9 2008 DEVELOMUE: RVICES VR bt I I � t, /I) C. 1 sq�3 0 CITY OF EDMONDS 0, 'W V/ 121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 - FAX (425) 771-0221 Website: www6edmondsma.us DEVELOPMENT SERVICES DEPARTMENT Planning - Building - Engineering May 1.9, 2008 Thomas Thompson, AIA 29619 15th Ave NE Stanwood, WA 98292 BWM, LLC 3425 24"' Ave W Seattle, WA 98199 GARY HAAKENSON MAYOR Re: Building, Permit Application: BLD2007-1258, 1259 & 1260 / AZ @ Edmonds Site Address: 23330, 23332, & 23334 Highway 99 Expiration Date: 6/17/08 Dear Thomas Thompson, AIA: The purpose of this letter is to infonn you that the above referenced permit application will expire on 6/17/08. According to Edmonds Community Development Code Chapter 19.00.005(A)(5), applications are only valid for a period of 180 days unless a written request for extension is submitted to the Building Official. If an application extension is granted it may only be extended for an additional 180 days for a total period of one year. If you need an extension on the Subject permit application You must submit a request in writing to the Building Official prior to plan review expiration. Please be advised, once the permit application expires, the application materials and plans will be destroyed within ten working days. Also, if the project is pursued in the future a new perrnit application and new fees will be required. If you have any questions, please feel free to call our offices at 425-771-0220. Sinc.,.Iely, Theresa b din o Senior Permit Coor (5 L\Temp\DST's\M aster LetterMpp Due to expire 10/21/00 Incorporated August 11, 1890 Sister City - Hekinan, Japan I 4 eVM 0q_9o,qI,q(dP'.) October 11, 2007 Revised March, 18, 2007 Project No. 07-076 Mr. Patrick Morris MorDevCo, LLC P * 0. Box 60152 Seattle, Washington 98160-0152 Gary A. Floweri, PLLC Geological & Geotelchnicall Cons.ulting 19532 12"' Avenue NE Shoreline, WA "155-1106 CIT Y. C OPY Subject: Subsurface Exploration and Geotechnical Engineenng Report Edmonds Commercial Development NW Quadrant of 230 St SW & Hwy 99 Edmonds, Washington Dear Mr. Morris: We have completed subsurface explorations and geologic/geotechnical engineering evaluations at the "Edmonds Commercial Development" project site at -the above noted location in Edmonds, Washington. This report summari7ts our findings, and presents information regarding subsurface conditions and geotechnical engineering design recommendations for planning and design of this,project- The project site is located on the west side of Hwy 99 (Aurora Ave N) j ust north of 234h Street SW in the southeast portion of the town of Edmonds. Development plans indicate that three retail buildings will be constructed on the site in the approximate locations shown on Figure, 1, Site and Exploration Plan. Associated parking lots and driveway will also be constructed as shown. We understand that, at present, site grading details havenot been finalized. However, preliminary plans indicate that only minor grading mill be required to accommodate building sites, roads,. and ston-n detention and utility construction. The purpose of our site evaluation was to characterize shallow soil and ground water conditions on the property, and to provide geotecbnical engineering design recommendations for planning and construction of the proposed development. The scope of our work included; 1) a review of provided development plans, 2) research of geologic and soils mapping information in ourfiles, 3) exploration of'site soils conditions using small, client provided.. ba0khoe, 4) perform geologic and geotechnical engineering evaluations. and 4) preparation of this report. Our field explorations'were conducted on July 3 0, 2007. 1 Cary A. Flowenw, F - 19M 120 Am= NE Shorclim, Wi0tington W 55-1106 D E C E �'S E JUL 0 3 2008 7-7640 I EEK EE -1 Proposed Edmonds Retail Development GeologicallGeo(echnical SerVices Report 234'h St. SW @T NIVY99,, Edmonds, Wastinj#on EXISTING SITE CONDITONS 1,he sub.eet property is shaped like a truncated triangle with the base to the north and the apex to 9 the south. It is bounded on the south by 234h Street SW, on the east by Hwy 99, on the north by a storage yard and on the west by an apartment complex. The site slopes gently downward to the east, Most of the grade change occurs on the westem two-thirds of the site while the area along Hwy 99 is relatively level. Based on hand measurements only, total elevation change across the site is on the order of 18 feet. The site is about 2 to 3 feet higher in elevation than the sidewalk along the cast side, No steep slopes exist within or adjacent to the property other than a 4 to 6 foot berm or slope along the west property line on the southern portion of the site. Due to very heavy vegetative cover in this area the actual slope was difficult to observe. Vegetation on the property consists of a stand of evergreen trees in the northwest portion of the site, a tow of tall bushes and deciduous trees along the western property line, blackberry bushes in the northeast portion of the site and field grass with some bramble bushes over the remainder of the parcel. The lower, eastern portion of the site had been recently mowed. There was no indication of standing or flowing water on the site at the time of our field work. No areas of erosion were observed anywhere on the site, SUBSURFACE CONDITIONS Explorations Our field explorations were performed on July 30, 2007. A total of six (0) exploration pits were excavated to determine subsurface conditions within the property. Due to the small size of the backhoe provided for the exploration work each of the pits was advanced to depth of 4 to 6 feet below existing grade. Exploration locations. are shown on the accompanying Site and Exploration Plan, Figure L Exploration locations were established by tape measurement and pacing, using available reference points, and should. be considered accurate only to the degree of the methods employed. 'Records of encountered soil types and conditions were maintained in the field by a licensed engineering geologist from this office, and are summarized in the accompanying boring logs. Soil samples obtained in the explorations were visually described by the geologist in the field. Gary A. Flotvers, PLLC. 19537 IP Avmuc NE Shorcl �ftc, Washington 9815 5-1106 206417-7640 N Propaved Umonds, Relad Awlopment GeologivallGeotechnical Ser0ces Repdrt 23e.Vt SW @ Hwy99, Edmonds, Washlngjon Geologic and Soils Mapping The following geologic and soils mappings were reviewed in our study-, 1) Geologic Map of the Edmonds Fast and Part of the Edmonds West Quadrangles, WashinSj2.n,_by J.P. Nfinard, 1983, U.S. Geologic Survey Miscellaneous Field Studies, Map MF- 1541 The Soil SgUe , ish Counly Area, 1983, U.S. Department of y of Snobom Agriculture, Soil Conservation Service, Sheet 5 1. The USGS mapping shows the terrain in the vicinity of the site to be formed over deposits of Vashon age glacial Vashon age glacial till (Qvt). The SCS mapping shows the vicinity of the site to fall within the Alderwood—Urban land complex, 8 to 15 percent slopes (soil unit 6) classification. Alderwood series soils form over glacial till parent materials. Soils encountered in our explorations are generally consistent with the USGS and SCS mappings. The development site was found to be underlain by dense, poorly stratified glacial drift soils. We interpret these materials as being the mapped Vashon till. The fill. consists of a poorly sorted asserrtblage of sands, gravels and cobbles in a dense, grey, fine sand/silt matrix. In native or slightly modified areas, generally on the lower or eastern portion of the site, our explorations encountered less weathered, dense or better parent materials at depths of about 2.5 to 3.5 feet. A zone of weathering has developed in the parent fill materials. The weathered soils take on a reddish brown color, and are in a loose to medium dense condition. The ave rage thickness of the looser weathered soils is estimated at about 2.5 feet. 'Filling and/or ground modification were encountered in the northern portion of the site and along the west boundary area. Indications of filling were recorded in exploration pits EP-3, EP-4, EP-5 and EP-6. Encountered fill depths were relatively minor, ranging from about 1.5 to 4.0 feet. We also observed an area of very recent filling where a Vactor Truck had recently dumped its load of fine grained sediment along the nordi property line. Other areas of deeper fills may be encountered during development of the site. Accurate details of the extent of ground modification wUl only become apparent at the time of construction of the new development. Ground Water No ground water seepage was observed in any of the exploration pits excavated for this. study. In addition, no indications of standing or flowing water or hydrophilic (water loving) -vegetation was observed on the site. During the wetter months of the year it may be possible for an interflow water to accumulate atop the wiweathered till sediments. Ground water interflow occurs as surface water migrates through the looser, More permeable weathered zone in the till and perches atop the relatively Gary A. Flowers, PLLC. 19532 1 P Avcnuc Kr Shoreline, Washington 98155-1106 206417-7640 PrqposedE&nomds Retail Developluent qeologicallGeolechnical,5ereice�v Report 234'4 St. SW @ Hi4y99. Edmondv, ftshivton impermeable dense parent material. Depending on the slope of the ground surface (and interface contact) within an area, the collected ground water may rernain stationary, or migrate down gradient along the top of the dense parent till surface. Interflow is most active in the winter months or during periods of prolonged, rainfall. During these times, infiltration of perched ground water into sandy seams orpockets, in. the dense parent material may also occur. This type of activity is considered to belocalized and is not an indication of a larger (regional) recharge condition. Interflow tends to be seasonal and the level of activity generally decreases significantly (or disappears) during the dry summer months. CRIMICAL AREAS Geologicafly Hazardous Areas Erosion Hazards As per EMC 23.80.020 erosion hazard are&s are at least those areas identified by the U.S. Department of Agriculture's Natural Resources Conservation Service as having a "moderate to severe," "severe," or "very severe" rill and inter -rill erosion hazard. Erosion hazard areas are also those areas impacted by shore land and/or stream bank erosion.Within the city of Edmonds erosion hazard areas include: 1. Those areas of the city of Edmonds containing soils that may experience severe to very severe erosion hazard. Ws group of soils includes, but is not limited to, the following when they occur on slopes of 15 percent or greater: a, Alderwood soils (15 to 25 percent slopes); b. Alderwood/Everett series (25 to 70 percent slopes); c. Everett series (15 to 25 percent slopes); 2. Any area with. slopes of 15 percent or greater and impermeable soils interbedded with granular soils and springs or groundwater seepage; and 3. Arm with significant visible evidence of ground water seepage, and which also include existing landslide deposits regardless of slope. As discussed in the Geologic and Soils.Mapping section above, the site is mapped as Aldcrwood —Urban land complex, 8 to 15 percent slopes. Based on our exploration findings, observation of open excavations on the adjacent property and site topography, we are of the opinion that this classification is appropriate. Water erosion hazard.for these soils is listed as moderate in the, SCS unit definitions. Therefore, the site does not meet the definition provided in the EMC for an Gary A. Flowers, PLLC. 195j21P Avaue NE shorefilic washI1101011 981 Si- 11% 2D6417-7640 Proposed. Edmonds Retail Development GeologicallGeotechnicat &ivicw Repbrt BeSt. SW(4oj Hwy99, Edmonds, Washington erosion hazard area. As such, and with the limited area of sloping ground andthe level area along l4my 99, standard erosion control practices will be suitable for this site. Landsfi* Hazard Areas7 Landslide hazard areas in Snohomish. County are typically defined as; 1.) areas of historic landsliding, and areas subject to undercutting by streams, rivers or waves, 2) areas with slopes steeper than 15% which intersect geologic contacts with a relatively penneable sediment overlying a relatively impermeable sediment, and which contain springs or ground water seeps, and 3) areas located in canyon or an active alluvial fan, susceptible to inundation by debris flows or catastrophic flooding. Our field measurements indicate that surface grades on this parcel are generally less than 15%. No ground water seepage or geologic contacts were observed with the exploration pits or during reconnaissance of the site. Considering the gentle site grades and dense or better glacial till underlying the development area, it is our opinion that this property is not at risk from landsliding. &isnlic Bazar& Earthquakes occur in the Puget Lowland with great regularity. The vast majorities of these events are small and are usually not felt by people. l4owever, large earthquakes do occur as evidenced by the 1949, 7.2-magnitude event, the 1965, 6.5-magnitude event, and the February 2001 magnitude 6.8 Nis-qually earthquake. The '1949 earthquake appears to have been the largest in this region during recorded history and was centered in the Olympia area. Generally, there are -four types of potential geologic hazards associated with large seismic events. These include: 1) surficial ground rupture; 2) scismically induced landslides; 3) liquefaction; and 4) ground motion. The potential for each of these to impact the site is discussed below. The nearest known fault is the Sound Whidbey Island Fault Zone. This fault zone consists of rriultiple splays located to the north of the site. The exact locations of the fault s lays are p 3 unknown but are likely several miles to the north. The South Whidbey Island Fault Zone and other nearby faults are being currently studied by the United States Geological Service (USGS) and have been determined to be active and capable of producing large earthquakes. Much is still to be learned about these fault systems but it is generally hypothesized that their recurrence interval is several thousand years. Due to the suspected long recurrence interval, the potential for surficial ground rupture is considered to be low during the expected life of the proposed development. Gary A. FloweM PLLC. 19532 1 P Avenue NE Shordine� Washington 98155-1106 206-417-7640 5 Proposed Edmonds Retail Development GeologictillGeotechniccil.Tervices Report �3e St. SW @,,M09, Edmonds, Wavhiaghon Due to the lack of slopes and the dense nature of the underlying glacial till materials, it is our opinion that there is no risk of darnage to the proposed development, by seismically induced landsliding on this site. Based on the sediments encountered in our explorations, it is our opinion that the risk of J�quefaction is negligible. In accordance with the 2003 International Building Code, Table 1615. 1. 1, the site soils within the development area fall within the "Site Class C" designation. CONCLUSIONS AND RECOMMENDATIONS On the basis of out geologic research and field explorations, the existing glacial deposits will provide excellent support for the proposed retail structures and associated driveways and parking areas. For foundations or paved areas to be placed on the weathered portion of the glacial till sedimenM the soils must be recompacted to a dense, nonyielding condition prior to concrete or roadway fill placement. For foundations placed on the unweathered, very dense, glacial till, the soils must be undisturbed. No structures should be placed on the encountered fill soils. The on - site soils are very moisture. sensitive and should not be worked during inclement weather. If these soils become over optimum in their moisture content, they will be easily disturbed and additional excavation may be necessary to teach bearing soils. If the soils are too dry at the time of construction, it will be difficult to add water and obtain consistent moisture content throughout. Therefore, the owner/contractor should be prepared to provide import granular material, as needed, for structural backfill on the project during wet weather construction or following extended periods of dry weather. A perched interflow water zone may occur on the site during extended periods of inclement weather. Although no ground water was observed in our exploration pits, interflow is typically seasonal and will likely reduce significantly, or dry up, during the drier seasons of the year. During wet weather periods the contractor should be prepared to deal with the interflow, as necessary. Site Grading Site grading plans were not provided prior to completion of this report. However, due to the relative gentle grade on the site, and the intention on the part of the client to work with the existing grade, we anticipate that grading will be limited. The site should be cleared of all vegetation, topsoil and existing fill soils that are not required as part of the landscape plan. These materials should be removed from. the site or stored for future landscape use. Gary A. FloweM PLLC 19532 12" Amue NP Shorclirw, Washington 98155-) 1 D6 206417-7640 6 �Psed Ednionds Retail Development GeologicallGeorechnical Services Report St. SW ge /Avy99, Edmonds, Washington If structural fill is necessary for site development it must be compacted to a dense, nonyielding condition. Structural fill. is defined as non -organic soil, placed in maximum 8-inch loose lifts with each lift being compacted to at least 95 percent of the modified Proctor maximum density using ASTM:D 15 57 as the standard. In the case of roadway and utility tTench backfill, the structural fill should be placed and compacted in accordance with, current local or county codes and standards. ne top of all compacted fill should extend horizontally outward a minimum distance of 3 feet beyond the, location of perimeter footings or pavement edges before sloping down at a maximum angle of 2H:IV. Structural fill placed in foundation excavations must extend a minimum distance of 2 feet beyond the edges of the footings. Depending upon final grading design, it appears that the pavements for this project will be supported by loose to medium dense, silty sand with some gravel (weathered glacial till) or structural fill soils atop these soils. These soils will require recompaction to a, dense, unyielding condition prior to placement of any concrete, pavement orstructural fill. Due to the fine grained nature of the on -site soils, they will be subject to disturbance when above optimum moisture content If the subgrade soils become unstable they will require further excavation to competent soils or moisture conditioning and compaction prior to installation of the pavement section. All structural fill less than 4 feet below finished grade for the planned driveways and parking areas should be compacted to 95 percent of the modified Proctor maximum dry density as determined by ASTM:D 1557. Prior to placement of pavement base course materials over natural subgrades, the area should be proof -rolled under the observation of a representative of this firm with a loaded dump truck or other suitable equipment to identify any soft, or yielding areas. Any soft or yielding areas should be removed and replaced with granular structural fill prior to continuing work. All areas to be paved should be crowned to direct storm water flow to the outside edge of the roadway. Temporary Excavations The appropriate slope configuration for excavation of soils depends on many factors including the presence and abundance of ground water, the type and density or consistency of the soils, the depth of cut, surcharge loadings (eg., from adJjacent structures, stock piles. construction equipment, etc.), and the length of time over which the excavation is left open. Construction slope angles.required for stability and safety depend on a careful evaluation of all of the above factors. Because of the many variables involved, the actual slope values required for stability in open cuts can only be approximated prior to construction. At this site, we anticipate that excavation cuts will encounter loose to medium dense modified ground and weathered native soils, and underlying dense or better glacially consolidated parent soils. In our opin ion, t I emporary cuts of 0.5H to I V (horizontal to vertical), of up to 6 to 8 feet in the dense or better Gary A. Flowers, PLLC 19532 1? Avenue NE Shonline. Washington 98133-1106 206-417-7640 Propmed Edmonds Retail Development GeologicallGeolechnicalVervices RVOIrt 2340 SL SW @ HuYK FdM glacial soils, and IH to IV cuts in, the overlying medium dense weathered glacial soils could be used for planning purposes. Any loose materials should be laid back to a 1.5B to IV slope. Some adjustments to these values are possible, but should be based on site observations by this office during construction. Actual sloping and maintenance of excavations during construction should be made the responsibility of the contractor, as he is continuously present at the site to observe the nature and condition of the excavation soils. Regardless of the construction method used for excavations, the contractor should be aware and becorne familiar with applicable local, �tate and federal safety regulations, including O.S.H.A. excavation and trench safety standards. Construction site safety and code compliance is generally the sole responsibility of the contractor. As is typical with earthwork operations, some sloughing and raveling may occur and cut slopes may have to be adjusted in the field. It may be necessary to cover the sides of temporary slopes with plastic or otherwise protect them from the elements to minimize sloughing and erosion. As ground water is encountered, the temporary slopes should be adjusted to a shallower gradient. Permanent, unsupported cut or structural fill slopes should not exceed a gradient of 2B:IV. Permanent, non-structural fill slopes should not exceed a gradient of 41+1V. Foundation Recommendations We are of the opinion that the medium dense or better native glacial till and/or glacial drift soils, or structural fill placed over these materials, will provide a commonly acceptable level of support for building and wall foundations. A net allowable design soil bearing pressure of 2,500 psf may be used in design for footings set into appropriately compacted, weathered native site soils, unweathered and undisturbed glacial till soils or approved structural fill placed over these materials. For short term dynamic loads, a reduction orf the factor of safety would be appropriate at this site, and a resultant increase of one-third for the above bearing pressures may be used. Higher allowable bearing pressures will be appropriate for any foundation that is set to bear entirely upon undisturbed glacial till soils. Should there be a need for higher bearing pressures, such as for certain column loads, we should be contacted to discuss options with the struct=1 engineer. Perimeter footings for the proposed structures should be buried a minimum of 18 inches into the surrounding soil for ftost protection. Settlement of footings placed as detailed herein should be less than I" total, and Vz" differential over a 20 foot span between comparably loaded footings. However, foundations placed on unapproved fill or disturbed soil may result in increased settlement. All foundation excavations should be inspected by a representative of this firm, prior to re -steel and concrete placement, to verify that, the design bearing capacity of the soils has been attained and that construction conforms to the recommendations contained in this report. Gury A. Flowers, PLLC 19532 IP Avenuc NE Shwlinc, Wfishingtim 98155-1106 206417-7640 Retail Developmetil GeologicallGeatechnicalVervices RePOrt ts, Washington LaterM loads may be resisted by friction at the base of the footings andfloor slab mid as passive pressure on the sides of f6otings. We recommend that an allowable coefficient of friction of 0.40 be used to calculate friction between the concrete and the underlying soil. Passive pressure. may be determined using an allowable equivalent fluid density of 250 pef. These values are allowable and include a factor of safety of at least 1.5. It should be noted that the area bounded by lines "tending downward at 1H: IV from any footing must not intersect another footing or wall, or intersect a filled area which has not been compacted to at least 95 percent of ASTM:D 1557. In addition, a 1.51-1:1 V line extending down. and away from ianyfooling must not daylight because sloughing or raveling may eventually undermine the footing. Thus, footings should not be placed near the edge of steps or cuts in the bearing soils or close to retaining walls unless the walls are designed for the additional surcharge load. Retaining Walls Retaining walls that are free to rotate may be designed.fbr an active equivalent fluid pressure of 35 pef with level backfill or 55 pcf with sloping backfill. If the walls arc restrained and unable to rotate they should be designed for an at rest pressure of 50 pcf for level. backfill and 70 pef with sloping backfill. Loads from traffic, equipment or surcharges from adjacent structures should be added to these values by the design engineer. Resistance to lateral loads will be as provided in the Foundations Recommendations section of this report. All structural retaining walls or landscape walls taller than 3 feet must be lined with a minimum of 12 inches of washed rock along their back sides to within I foot of finish grade, or by . an approved drainage mat such a MiraDrain or IncaDrain. The washed rock or drainage mat must hydraulically connect to the footing drain. We are unaware at this time of any mechanically stdbili7xd earth retaining walls planned- for the site. If arty such walls are planned that are over 4 feet in height� we should be contacted to evaluate the walls and provide a suitable design. Floor Support Recommendations Slab -on -grade concrete floors, may be placed over firm non -yielding native subgrades or atop structural fill. Any material that has been disturbed and is not dense and unyielding should either be recompacted or removed and replaced with structural fill. A capillary break layer consisting of 4 inches of washed pea gravel or other clean, washed, granular material, aiid a heavy duty (minimum 10 mil), polyethylene plastic vapor barrier should be provided under any floor slabs where moisture intrusion is a concern. If the vapor barnier becomes compromised in. arly way during construction it should be replaced or an additional layer added, Penetrations through the vapor barrier should be wrapped and taped. Gary A. Flowers, PLLC. 19532 1 P Avenue NE Shoreline, Washington 98155-1106 206417-7640 9 PmposedEdmon& Retail Devel9pment GeologicallGeatechnical Services Report 234'* St SW @ H-�09,_ -Edmondy, !Eashington Site Drainage. All storm water runoff from impervious surfaces should be collected and piped into an approved storm water drainage system. All perimeter footing walls and retaining walls should beprovided with a drain at the footing level. Drains should consist of rigid, perforated, PVC pipe surrounded by washed pea gravel. The pipes should always be placed such that the perforations are located on the lower one-third of the pipe section. The level of the perforations in the pipe should be set no higher than the bottom of the footing and the drains should be constructed with sufficient gradient to allow gravity discharge away from the buildings. Roof and surface runoff should not discharge into the footing drain system, but should be handled by a separate, rigid, tightfirle drain that discharges into an approved %torm water conveyance system. In planning, exterior grades adjacent to walls should be sloped downward away from the structure to achieve surface drainage. Erosion Protection The natural on�site soils contain a significant amount of fines and are considered to be moisture sensitive. We anticipate That these materials, when disturbed, will be vulnerable to erosion from both sheet flow and channelized flow. However, due to the gentle site. gradient the erosion potential should be addressed by standard erosion control methodology. The plan should include, at a minimum, placement of silt fences along the lower reaches of the property. The silt -fences should be placed as per local muriicipal specifications, and be properly maintained. Soil stockpiles should be covered with plastic sheeting during periods of inclement weather. During rainy weather, areas stripped of vegetation and exposed backfill should be covered with plastic or a minimum of 2 inches of straw mulch when not being worked. The construction entrance should be rocked to minim�ize off -site Soil transport. SUMMARY Based on our site reconnaissance and subsurface explorations, we are of the opinion that the subject site is suitable for the. proposed development provided the recommendations presented herein are properly implemented. We recommend that we be retained to provide construction monitoring and consultation services to verify that subsurface conditions are as expected and that construction conforms to the recommendations in this report and the project plans and specifications. Should conditions be revealed during construction that differs from the anticipated subsurface profile, �ve would be able to evaluate those changed conditions, and provide alternative recommendations where appropriaie. (.7ary A. Flowers, PLLC_ 19532 121b Avenue NE Shoreline, Washington 9815$-1106 206417-7640 10 Proposed on& Retail Development GeologicallGeotechnical Semices Report 234"' A SW , Hwy99, Edmonds, Washinglon Our findings and recommendations provided in this report were prepared in accordance with generally accepted principles of engineering geology and geotechnical engineering as practiced in the Puget Sound area at the time this report was submitted. We make no other warranty, either express or implied. Sincerely, Gary A. Flowers, P.G., P.E.G. Engineering Geologist Attachments: Figure 1: Site and Exploration Plan Appendix A —Exploration Pit Logs Robert M. Pride, P.E. Geotechnical Engineer Gary A. Flower& PLLC. 19532 126 Avenue NE shmline, wwhington 98155-1106 206417-7640 vl�� .4 14- 'P6 tow A, ME Lay Z:� LUALANG 51, EP-4 FFF', 412 RETAIL 8 4,177S,f, HE 413 U JzLi 1. AutoZone 7n? 7,369 sli f EP-3 ul EP-2 EP-5 LEGEND EP-1 a Appro)dmate lor-ition of expitomfion pR KtMKk:ftlUt: f MIMS I nOMPSOn. AL-- alzqful FGARY A. FLOWERS, PLLC Ott J RETAK A 4,970 Sf FE 4-- EP I N 0 A 30 . SCALE IN FEET SITE AND EXPLORATION PLAN FIGURE 1 COMMERCIAL DEVELOPMENT DATE 9/07 HIGHWAY 99 AT 234TH STREET SW EDMONDS, WASHINGTON PROJECT NO. 07-016 Edm Retail Development GeologkatlGeofechnical Services Repart 23 'St. SW @ 9, Ethnondvi Washington A EP-1 0.0'— 0.3' sod/topsoil OX-3.5' medium dense, damp, brown, silty SAND with gravel to 6" diameter (weathered native) 3.5'-4.0' dense, damp, gray, silty SAND with gravel (glacial till) BIOH @ 4.0' No caving No ground water EP-2 0.0'— OR sodAopsoiI 0.6'-2.6' medium dense, damp, brown, silty SAND with gravel to 6" diameter (weathered native) 3.5'4.0' dense, damp, gray, silty SAND with gravel (glacial till) BOH @, 4.0' No caving No ground water EP-3 0.01-1.51 loose, brown, silty SAND with gravel and minor debris (fill) 1.5'-2.6' medium dense,, damp, brown, silty SAND with gravel. to 6" diameter (weathered native) 2.6'-4.0' dense, darnp, gray, silty SAND with gravel (glacial till) BOH @ 4.0' No caving No ground water EP-4 O.W— 0.7' forrest duff 0.7'- IT medium dense, dry to damp, brown, silty SAND with gravel to 8" diameter and minor debris (fill) 3.7'-4.0' medium dense, black, fine, sandy SILT with organic$ (telic topsoil layer) 4.01-6.01 medium dense, damp, brown, silty SAND with gravel to 6" diameter (weathered native) BOH, @ 6.0' No caving No groundwater Gary A. Flowers, PLLC. 19532 120 Avenue NE Shomlinc, Washington 9X15S-1106 206-417-7640 12 Proposed Unrondi Retail Developmetit GeologicallGeotechisical Services Rep&rt 234'h St. SW (a) lhvy9�, Edmond% Washinglon EM 0.0"— 3.0' loose, brown, silty SAND with gravel to 8 inch diameter and minor debris (fill) 3.0'-5.0' mediurn dense, damp, brown, silty SAND with gravel to 6" diameter (weathered native) BOH @ 5.0' No caving No ground water EP-6 0.0'— 3.0' loose, brown, silty SAND with gravel. and minor debris (fill) 3.0'-5.0' medium dense, damp, brown, silty SAND with gravel to 6" diameter (weathered native) BOH @ 5.0' No caving No ground water Gary A. Ftowers, PLIk. 19532 121h Me= NE S11wdinc, wasbington 98155-1106 206-417-7640 13 ED M 07-91 EDM 7-92 FM October 1111 2007 Project No.. 07-076 Mr. Patiick , Morris MoiDevCo, LLC P.O' * Box 60152 Seattle, Washington 98160-0152 WAry A. Flowers, PLLC Geological & Geotechnical Consulting '19532,120 �kvenue NIE. fShoreline, WA 98155-1106 RIECE H ED 5iH I EECE S, ubj ect: Subsurface Explorationand Geotei,76ical',En gineeringReport Edmondi Commercial Development NW Quadrant of 234h StSW & Hwy 99 Edmonds, Washington Dear Mr. Morris: We; have completed subsurface explorations and geologic/geotechnical engineering evaluations at the "Edmonds Commercial Developmenf'-project site at the above noted location in Edmonds, Washington. This report, summarizes our 'findings, and presents information regarding - subsurface conditions and geotechnical' engineering design recommendations for planning"and design of this project. The project site is located on the west side of Hwy,99 (Aurora Ave N) just north of 2134h Street SW in the southeast portion of the town of Edmonds. Development plans indicate that,three, retail buildings will be constructed on, the site in the approximate locations shown on figure 1, Si I te and,Exploration Plan. Associated: parking lots :and drive,,Aay will also be constructed as shown. We understand that, at, present-, site grading details have not been finalized. However, preliminary' plans indicate that only, minor grading will be required to accommodate building sites, roads, and storm detention and, utility construction. The purpose of out site evaluation was to characterize shallow soil and ground water conditions on. the property,, and to, provide geotechnical. engineering design recommendations for planning and construction of the pro' sed development. The scope of our workincluded; po ,,j LW . I f 0' ""'e4;e provided development plans, 2) research of geologic and il ation .1 o "r fi -s� 3) exploration of site soils conditions using small, client P:ov ed, baC ologic a 0 and geotechnical engineering evaluations, and 4) prepawn i n of thi 0 field explorations were conducted on July 30, 2007. LODEN rm Gary A. Rowers, PLLC. 19532 1 P Avenue NE Shoreline, Washington 99155-1106 206-417-7640 RECENVE DEC 17 2007 BUILDING DEPARTMENT CITY OF EDMONDS Pr, up, osed Edmonds.Relail Development GeologicallGeotechnical Services Report 23,0; St 4'@ Mt, y99, Edmonds, Washington EXISTING SITE CONMITONS The � subject property is shaped like a truncated triangle with the base to the north and the apex to the §outh..-It is bounded on the south by 2346'Street SW, on the east by Hwy 99, on the north by a storage yard�and on the west by an apartment complex. The, site slope& gently downward to the east. Most of the grade changeoccurs o I n the western two-thirds of the site while the area along Hwy .99 is relatively level. Based on - han,d measurements, only, total elevation change across the site is on the. order of 18 feet. 'The site, is about 2 to 3 feet higher in- elevation than the sidewalk along the east side. No steep slopes exist within or adjacent to the property other than. a. 4 to 6 foot berm or slope along the west property line -on the southern portion of the site. Due to very heavy vegetative cover in this area the actual slope was difficult to observe. Vegetation, on the proper . ty consists of a stand ofevermen trees in the northwest portion of the, site,! a.row of tall bushes and deciduous -trees alon g- the we;;stern property line, blackberry bushe& in the northeast, portion of the site and field grass with some bramble bushes over the remainder of the parcel. The lower, eastern portion of the site had been recently mowed. There was no indication of 'standing or flowing water on the site at -the time of our field work. No areas of erosion, were observed anywhere, on the site. SUBSURFACE CONDITIONS Explorations Our field explorations were performed on July �O., 2007, A total of six (6) exploration pits were, excavated to determine subsurface conditions within the property. Due to the small size -of the backhoe provided for the exploration work each of the pits was advanced to d epth of 4 to 6 feet below existing grade. Exploration locations are shown on 'the accompanying Site and Exploration Plan, Figure 1. Exploration locations were established, by tape measurement and pacing, using available. reference points, and should be considered accurate only to the degree of the methods employed. Records of encountered. soil types and conditions were maintained in the field by a licensed engineering geologist from this office, and, are summarized in the accompanying�boring logs. Soil samples obtained in the explorations we'revisually described by the geologist in the field.. Geologic and Soils Mapping T ' f he ollowingge-ologic and soils mappings were reviewed in out study; Gary,�_ Flowerms, PL 19532, IP,Avcnuc NE Shomfinc. Washington 98155A 106 .206A 17-7,640 2 Proposed Umonds Retail Duvelopment GcologicallGeotechnical Services Report 23e,Sf. SWfaD HuyO, Edmonds, ff"ayhington gum 1) 2) washinjgon, by J.-P. Minard, 1983, U.S. Geologic Survey Miscellaneous Field Studies, Map MF-I 541 The. Soil SMLM of, Snohomish County Area bj� 1, 983, U.S. Department of' Wg�L Agriculture, Soil Conservation Service, Sheet 5 1. The USGS mapping shows the terrain in the vi cinity of the site, to befornied over. deposits of Vashon age glacial Vashon age glacial fill (Qvt). The SCS mapping shows the vicinity of the site to fall within the Alderwood—Urban land complex, 8 to 15 percent slopes (soil unit 6) classification. Alderwo.o.d series soils form overglacial till parent materials. Soils encountered in our explorations are generally consistent with the'USGS and, SCS mappings. The'development site was found to be underlain by dense, poorly stratified glacial drift soils. We interpret these materials as being, the mapped Vashon till. The till consists of a poorly sorted asseniblage of sands, gravels and cobbles. in a dense, grey, fine sand/silt matrix.. In native or slightly -modified areas, generally on the lower or eastern portion of the site,. our. explorations encountered less weathered, dense ' or better parent materials at depths of about 21.5 to 3.5 feet. A zone of weathering has 'developed in the, parent till materials. 'Me weathered soils take,',on.a reddish brown color, and are in� a loose to medium dense condition. The avera'ge'thickness of the looser weathered soils is estimated at about, 25 feet. Filling and/or ground, modification were encounteredin the, northern portion of the site and along the west boundary area, Indications of fillm*gwere recorded in exploration pits EP-3, EP4, EM and EP-6. Encountered fill depths were relatively minor, ranging f5rom. about 1 .5 to 4.0 feet We also observed an area of very recent filling where a Vactor Truck had recently dumped its- load of fine grained sediment along the�north property line. Other areas of deeper fills may be encountered during development of the site. Accurate details of the extent' of . ground modification will only become apparent at the time of construction of the new development. Grottnd Water No ground water seepage was observed in any of the exploration pits excavated for this study. In addition, no indications of standing or flowing water or hydrophilic (waterloving) vegetation was:observed on the site. During the wetter months of the year it may be possible for an interflow water to accumulate atop the unweathered till sediments. Ground water interflow occurs as surface water migrates through the : looser, more permeable weathered I zone in the till and perches atop the relatively impermeable dense parent material., Depending onthe slope of the ground surfke (and interface contact) within an area, the -collected ground water may remain stationary, or migrate down gradient along the top of the den�e parent till surface. Interflow is most active in the winter Gary.A. Ftowers, PLLC 19532 12" Awnue NE Sbordinc,'WaAington 98155-1106 2,06-417-7640 Proposed E&nonds Retail Deveiopment GeologicallGeotechnical Services Report 23e�StSW@HuT99,,�dmonds, lVashingtOn moriths or during periods of prolonged rainfall. 'During these times., infiltration of perched groundvNzter into sandy seams or pockets in the dense parent material may also occur. This type of activity is considered to be localized and, is not an indicafion of a larger (regional) recharge, condition. Interflow tends to be. seasonal and the level of activity generally decreases sign . ificantly (or disappears) during the dry.summer months. CRITICAL AREAS Ge�logically Hazardous Areas Erosion Hazards As,discussed above'..,the site is mapped as Alderwood —Urban land complex., 8 to 15 percent slopes. Based on our , explorat ion findings and observatio . nof open excavations on the adjacent property, we are of the opiniori that this classification I is appropriate. Water erosion'hazard for these soils is listed as moderat6 in the SCS- unit definitions. When disturbed during construction. the.hazard of erosion for these soils will. be severe. However, due to the limited area of slope and the level area along,Hwy 99, standard erosion controlpr6ctices will be suitable for this site. Landslide Hazard Areas Landslide hazard: areas in Snohomish County are typically defined as,; 1) areas, of historic landsliding, and areas subject to undercutting by streams, rivers or waves, 2),areas with slopes steeper than 15% which intersect geologic contacts with a relatively permeable sediment overlying a relatively impermeable sediment,- and whichcontain springs or ground. water seeps, and 3) areas located in canyon or an active alluvial fan, susceptible to inundation by debris flows or catastrophic flooding. Our field measurements indicate that surface grades on this parcel are generally less than -15%. No ground water seepage or geologic contacts were observed with the exploration pits or during r econnaissance of the site. Considering the gentle, site grades and dense or better glacial,till underlying the.: developtnent area, it is, our opinion 'that this property is not at risk- from landsliding. Seismic Hazards Eart I hquakes occur in -the Puget Lowland with, great regularity. The vast majorities of these events are 1 small andare usually not felt, by people. However, large earthquakes do occur. as evidenced by the 1949, 7,.2-magnitude, � event, the 1965, 6.5-magnitude event, and the February 2001 magnitude 6.8 Nisqually earthquake, The 1949 earthquake appears to have been the largest. in this region during recorded histo�y and was centered in the Olympia area. Giry A. Flowers, PL(.C— - 1,9113�7'le Avenuc NE s: lin" , W%hingwn 98 1155-.1106 2D6-417-7640 P�.oposrv4.&dmonds Retail Dc�velqpmenf GeologicdIlGeoiechnical Smices Report I . I I I I 23e&,��w 99, Edmonds, Washington :Generally, there'are four type's of potential geologic hazards associatedwith large seismic events These includc- 1) surficial groundrupture- 2) seismically induced landslides; 3) liquefaction;"and 4) ground motion. The potential forekh of these to imp I act thc,lsite is, discussed below. . -The, neafest'known, fault is,the, Sound, Whidbey Island Fault Zone. This, fault zone consists of a ons- of the, fault 'lay multiple Ways located, -to,,,the north of the'site. nm& exact, lo ti sp s are, unknown but,are likely se I veral'miles, to1he north. The, South Whidbey Island, Fault, Zone and. other nearby faults arebeing currently studied by the'United States Geological Service (USGS)� and have been determined -to be. active'and cavable of producing large earthquakes. Much is stiff, to be learned about these "fiultl sysiemsbut �,it is generally hypothesized that their recurrence.. interval ,is several I thousand'yea,rs. Due to the suspected long recurrence interval, the potential for' Iciat �ground rupture i s, considered to be low during the expecte.d.jife of Ahe proposed Aevelopment IJ to the lack of s0opes �and the dense'. nature of the underlying glacialfill materials, itis 011r" that there is no risk of damage, to the proposed development� by seismically induced landsliding on thissiW. Based on the" s6dih I ients encounte I red -in our explorations, it is, our o . p . inion'thid., the, risk 6f liquefaction is negligible. In accordance with1he 2003 International guildin th g Code, Table 1615.1.1, the site soi s wi in e .development area,fall within the "� Site, Class C" designation. CONCLUSIONS AND RECOMMENDATIONS On the basisof 'our, . 'geologic research, Afid'field explorations, the existing glacial deposits'Will.' provide expelleptsu o ' for the proposed, retail, structures and associated driveways and parkin& Pp rt '''be placed on the weathered'portion-,of the glacial, till, areas. Foifibundations or paved areas to- sediments,,the'soils mu§t'be reeompactedt6,a dense,,' nonyielding condition prior to concrete or-, r6admiay fill placement. For foundati.ons'plalced on the unweathered, very dense, glacial till, the soils must be undisturbe& No structures should be placed on the encountered fill soil& The on- site;soils are yery moisture'sensitive'a,nd; should not1be worked during inclement weather. If thes : e soils become over, optimum in their moisturecon I t I ent, they willbe easily d'isiurbe&and additional excavation may be necessary'.to,reach beating soils., If the soils are too dry at the, -time, of construction, it will- be difficult to. add water I and obtain I 'consistent moisture content throughout. . Therefore the owner/contractor should, be prepared to provide � import granular material, as needed, for structural. backfill � on, the i ject during wei� weather construction -or proi following extended periods of dr�,r weather. Giry A. Flowers" PLLC 19532 1PAVenueNE shwtjine,'Woswngton�98155-1106: 2064174640 5 Proposed..F-dm�7ndsRelo.ilDevelopmenI GeologicallGeotechnkal Servica Report 234(h,S1. SWO) H%yW, I E&no."A Washingjon A perched interflow water zone may occur on.the site.during extended periods of inclement weather. Although no ground water was observed in our exploration pits, interflow is. typically seasonal and will likely reduce significantly, or dry up, during the drier seasons of the year. During wet weather periods the contractor should be prepared to deal with. the interflow.'as necessary. Site Grading Site, grading plansmere not provided prior to completion of this reporL 'How -ever, due to the relaiive gentle grade on the site, and the� intention on the, part of the client to work with the existing grade, we anticipate that grading will be limited. The site sho r uld be cleared of all vege.tation topsoil and existing fill soils that are, not required as part, of the landscape plan. Thesematerial s should be removed from the site or, stored for future landscape, use. If structural fill is necessary farsite development it must be compacted to a dense, nonyielding condition. . Structural fill is defined as non -organic. soil, placed in maximum 8-inch loose lifts with each lift being compacted to at least 95 . percent of th6.modified, Proctor maximum density ,!using ASTM.:D. 1557 as the standard, In the case of roadway and 'utility trench backfilll the structural fill should be placed and com, pacted in . accordance with current,local or county codes and standards. The top of alL compacted fill should extend 'horizontally outward a minimum distance of * 3 feet beyond the lookion of perimeter footings or,pavemerit edges before sloping down at� amaximurn angle of 2H: ' IV. Structural fill placed in foundation excavations must extend a minimum distance of'2 feet beyond the edges of the f6otings. Depending upon final grading design, it appears -that the pavements for this project Will be supported by loose to medium dense,,silty sand with sorne.gravel (weathered glacial till) or structural fill soils atop these soils. These soils will require recompaction to a dense, unyielding condition prior to placementof any concrete, pavement or structural fill. Due to the fine grained nature of the on -site soils, they will, be. subject to disturbance when above optimum moisture content. If the -subgrade soils become unstable they will require further excavation to competent soils or moisture conditioning and compaction prior to installation of the pavement section. All structural fill less than 4 feet below finished grade for the planned driveways and parking areas should be compacted to 95 percent of,the modified Proctor maximum, dry density as determined by ASTAD 1557. Prior to placement of pavement base course materials over natural subgrades, the area should. be proof -rolled under, the observation of a representative of this� firm, with a loaded dump truck or other' suitable'equipriient to identify any soft or yielding areas. Any soft or yielding areas should be removed -and replaced with granular structural fill prior to continuing work. All areas'to be paved,sbould'be crowned to direct storm water flow to the outside:edge of the roadway., CM A. F1Qwers,.PLLC. 19532 126 Awnut NE Shoirfine, Washinjt6n 98155-11106 206-417-7640 6 �, Proposed F datonds Retail Development deologicallGeatechnicat Services Report 23,�'M. SW@ H%y99, Edmonds, Washington Temporary Excavations The appropriate slope configuration for excavation of soils depends on many factors including the presence and abundance of ground water, the type and density or consistency of the soils, the depth of cut, surcharge loadings (e.g., from adjacent structures, stock piles, construction equipment, etc.),.and the length of time over which the excavation is left open. Constructionslope ahgli:s requircd,for . stability and safety depend on a careful evaluation of a of the above factors. Because of the manyvariables involved, the actual slope values required for stability in open cuts can only be approximated prior to construction. At this site, we anticipate, that excavation cuts will encounter I look to medium dense modified ground and weathered native soils, and underlying dense or better glacially consolidated parent soils. In our opinion, temporary cuts of 0.5H to IN (horizontal to -vertical), of up. to 6 to 8 feet in the de#se'or better glacial soils, and IH to IV cuts in the overlying medium -dense weatheredglaciiI soils, could be used for planning purposes. Any1oo'se materials should be laid back to a 1.5kip IV slope. Some adjustments to these values are possible, but should be based on site observations by this office during construction. Actual sloping and maintenance of excavations during construction should be made the responsibility of the contractor, as he is continuously present at the site to .o.bserve the nature and condition of the -excavation soils. Regardlessof the construction method used for excavations, the contractor should be aware and become familiar with applicable local, state and federal safety regulations,'including O.S.H.k excavation and trench safety standards. Construction site safety and code compliance is generally the sole responsibility of the contractor. As is typical with earthwork -operations, some.sloughing and raveling may occur and cut, slopes may have to be adjusted in the field. It may be necessary to cover the sides of temporary slopes with plastic or otherwise, protect them froin'the ' elements to minimize sloughing and erosion. As, ground water is encountered, the temporary slopes should be adjusted to a shallower gradient. Permanent, unsupported cut or structural fill slopes should not exceed. a gradient of 2H. IV. Permanent, non-structural fil I slopes,should not exceed a gradient of 4H: IV. Foundation Recommendations We are of the opinion that the me.chum dense or better native glacial till and/or glacial drift, soils, or structural fill placed over these materials, will provide a commonly acceptable level of support for building and wall foundations. A net allowable design soil bearing pressure of 1,500 psf may be used in design for footings set into appropriately compacted, weathered native site soils, unweathered and undisturbed glacial till soils or approved structural fill placed over these materials. For short term dynamic loads, a reduction of the factor of safety would be appropriate at this site, and a resultant increase of one-third,for the above bearing pressures may be use& Gary A. Flowers, PLLC 19532 12'h Awnuo NE ShoreJ*� Washitigton 09155-1106 20"17-7640 7 Proposed FAtonds Retail Developpient GeologicakGeotechnicaI Services Report 234'6 St. SW @ ffisyO, Edmonds, Washington Higher allo-w-able bearing pressures will 'be appropriate for any foundation that is set, to bear entirelyupon undisturbed glacial till soils. Should there be a need for higher bearing pressures, such as for certain column loads, we should be contacted to discuss options with the structural engineer. Perimeter footings for the proposed structures should be buried a minimum of 18 inches into the surrounding soil for frost protection. Settlement of footingsplaced as detailed herein �hould'bi less- than I" total and 1/2" differential over a 20,foot span between comparably loaded footings. However. foundations placed on unapproved fill or disturbed soil may result in increased settlement. All foundation excavations should be inspected by a representative of this firm, prior to re -steel and concrete- placement to verify that the design bearing capacity of the soils has been attained and that construction conforms to the recommendations contained in this report. Lateral loads may be resisted by ffiction at the' base of the footings and floor slab andas passive pressure on the sides of footings. Wercoommend that an allowable,coefficient of friction of 0.40 be used to calculate friction between the concrete -and the underlying soil. Passive pressure may be determined using an allowable equivalent fluid density of 250 pef These values are allowable and; include a factor of safety of at least 1.5. It should be noted that the area bounded by lines extending downward at I H: IV fi-om any.footing must not intersect another footing or wall, or intersect a filled area which has not been compacted to at least 95 percent of ASTM:D 1557. In addition, a 1.514: IV line extending down and away from any footing must not daylight because sloughing or raveling may eyentually undermine the footing. Thus, footings should not be placed 'near the edge of steps or cutsin the bearing soils or, close to retaining walls unless the walls.are designed for the Additional surcharge load. Retamimig Walls Retaining walls that are fi-ee to rotate may be designed for an active equivalent fluid pressure of 35 pcf with level backfill or 55 pef with sloping backfill. If the walls are restrained and unable to rotate they should be designed for an atrest pressure of 50 pcf for level backfill. and 70 pcf with sloping backfill. Loads from traffic, equipment or. surcharges from adjacent structures should be added to these values by the design engineer'. Resistance to lateral loads will be. as provided in the Foundations! Recommendations' section of this: report. All structural retaining walls,or landscape walls taller than 3 feet must be lined with a minimum of 12 inches of washed ro ' ck along their back sides to within I foot of finish grade, or by an approved drainage mat such a Mira.Drain orincaDrain. The washed rock or drainage mat must hydraulically connect to the footing drain. AF Gary A. loiveM PLLC_ 1953� 12" AvemeW Shomlim Washin" 98155-1106 206417-7640 Proposed &dmond�- Retail Deyelopment OvologicallGeotechnical Serviewn Report 2341h.S1. SW @,H14yqq, � Edmonds, Washington We are unaware at this time of any mechanically.stabilized earth retaining walls planned for the site. I If any such walls are planned that are over 4 feet in height, we should be contacted to evaluate the walls and provide a suitable design. - Floor Support Recommendations Slab -on -grade concrete floors may be, placed over firm non -yielding, native s6giides or atop structural -fill. Any material that ha�s been disturbed and is not dense and unyielding should either be recompacted or removed and replaced with structural fill. A capillary break layer consisting of 4 inches I of washed. pea. gmvel or other clean, washed, granular material, and �a heavy duty (minimum 10 mil), polyethylene plastic vapor barrier should be providedunder any floor slabs where. moisture intrusion is a concern. If the vapor barrier becomes compromised in any way during construction it. should b e replaced or -an additional layer added. Penetrations through the vapor barrier should bewrapped and taped. Site, Drainage All, ! storm water runoff from � impervious surfaces,should be collected and piped into an, approved storm water drainage system. All perimeter fboting walls . and retaining walls should be provided with a drain at the footing level. Drains should'consist of rigid,, perforated, PVC pipe surrounded' by washed pea gravel. The pipes should always be placed such th . at the perforations are located on the lower one-third of the pipe section. The level of the perforations in the pipe should be set no higher than the bottom of the footing., and the drains should be constructed with sufficient gradi . ent to allow gravity discharge away from the'buildings. Roof and suriace runoff should not -discharge into the footing drain system, but should be handled by a separate, rigid, tightline drain that discharges into an approved, storm water conveyance system. In planning, exterior grades adjacent to walls should be sloped 'downward away from the structure to achieve surface drainage. Erosion Protection The natural on -site soils contain a significant,amount of fines and are considered tobe moisture sensitive. We anticipate that these materials, when disturbed, will be vulnerable to erosion from botfi sheet flow and cbannelized flow. However, due to the gentle site gradient the erosion potential should be addressed by standard erosion control methodology. The plan should include, at a minimum, placement of silt fences along the lower reaches,of the property. The silt fences should be placed as per local municipal specifications, and be properly maintained. Soil stock -piles should be,colvered with plastic sheeting during periods of inclement weather. During ramy weather, areas stripped of vegetation and exposed backfill should be covered with plastic or a mimmurn of 21nches of straw mulch wheniot being worked. The constructioh'entrance should be rocked to Minimize off -site soil transport. Gary A. Ftowem PLLC. 19532 121b Avenue NE Shmlinc. Washington 9915571106 206-417-7640 9 Piwpqsed Mmonds Retail Development GiologicallGeolechnical Services Report 234'* �;St. SW @ . 99,-Edmands, Washington _6 SUNUMLARY Based on our site reconnaissance and subsurface explorations, we are of the opinion that the subject site -is suitable for the proposed development provided the recommendations presented' herein are properly implemented. We recommend that we be retained toprovide'construction monitoring and consul ' tation services to verify that subsurface conditions are as expected and that construction conforms to the ,recommendations in this report and the project plans and specifications. Should conditions be. revealed during construction that differs from the anticipated subsurface profile, we would be. able to evaluate those changed conditions, and provide alternative recommendations .,where appropriate. Our findings and recommendations p r-ovided in this report "were prepared in � accordance with generally accepted principles of engineering geol 'and geotechnical engineering as practiced in NY . - the Puget Sound area at the time, thi , s report was submitted. 'We make no other warranty, either express or.implied. &A60.66*_ Sincerely, Gary A. Flowers, P.G., P.E.G. Eng ineering Geologist Attachments: Figure 1: Site and Exploration Plan Appendix A - Exploration Pit Logs Robert M. Pride, P.E. Geotechnical Engineer GaTy A. Flowem PLLC 19532 12" Aymuc NE Shominic, Washington 9 8155'-11.06 20&-417-7640 10 il 0 '6'.' V. w­ RETAIL 8 Frf, 4 2 (7-11 EP-4 FFE 4 1.1 Autolone TA W 7,369 sl E P ­3 J, F-1 S" it 41 EP4 EP-6 EP RETAIL A 4,970 S.F. FFE 4 1 W EP-1 Ak- LEGEND EP4 Approxhate locatlon of exploration 0 KI:HzKk:NGh' . I nOMUS I nOMPS00, MA, W14M I GARY A. FLOWERS, PLLC N 0 A 30 SCALE IN FEET SITE AND EXPLORATION PLAN FIGURE I COMMERCIAL DEVELOPMENT DATE 9107 HIGHWAY'99 AT234TH STREET SW EDMONDS, WASHINGTON PROJECT NO, .07-076 Prootn d f pment 0109 e , dmon& &?Iad Dt"'l-do Qe icallGeolechnical Servied Reporl HUYOJE 2,34K'St, SW� Ed.�ondv, lifarhingf n 0'0'�' OY O.k_3.51' 15'4.0 3.5'4.0$ EP-;3 2.0' L4.0- ,EP4 0.9'�'03' 7 , 3.7' .3.7'4.0' 4.0%6-0' APPENDIX A sod/top I soil medium,dense, dampibrown,' silty SAND with gravel to V diameter, (weathered native) dense, damp, gray, silty, S'o&b with I gravel. (glacial till) 9��� sod/topsoil, meAjum dense, damp, brown silty SAND withgravel to 6" diameter,(weathered native) dense, damp.' gray, silty SAND with gravel Wacial iilly. loose, -brown, silty $AND with, gravel and mino deb s' 11) i r ri H (f medium dense, dAmp,: b�p silty SAI�D with �gravdl to 6," diameter (�Aieathered', nativ,P), dense, damp, gray, silty SAND with gravel (glacial till) 2. H,, 2@ 4.OW' No caa'W,,, �No gound watel forrest'duff medium . dense, dryto dAmp,brown, silty.SANDwith gravel to 811, diameter and, rninor,dehri� (fill) medium dense. black, fine, sandy SILTwith, organics (relictopsoil layer) mediiili6'd�n�e,"d4mp,,br,6,wn, silty SAND with gravel to V diameter (weathered native) BOH.'@,6.0"'No caving, No ground water 19532 126 A�c�uc NE Gair'y'A.Fi�w'ersiVLLC ��81554 106. 206-417-'7640: Pro -icei Re [,4,sedfdmonds Retait bel,�Iqpnlenl Ge�lpgicallGcotechnical Sery port, 234� St, SW i� Hv-�N9, Edmandt Waghifigi�n EP-�5 Off— 1W loose, brown,.siltv SAND wiffi gravel to 8 incb'diameter,and minordebris (fill)" 3-W-5.0' medium dense, damo, brown, si4 SAND with gravel to, 67 diameter (weathered native BOH @ 5,.O'-'No caving: No und-wAter gro EP4 0.0�3-0` lqose,,�Fqwn� silty I SAND with gravel and'minor debris.(filt) m I diameter (weathered 3.07:-5.0 ro,%%, SlIty'SAND vd'ith'f grave' to 6 4ative) BOH Q 5.0' No, ca*ng-1,No ground water Gary. A. FIGwem PLLC- 19531 120�.A'vcnue NIR, Wa'qhk gim�qlt I ss- 1106 206,417-764'q", -7� e, CITY OF EDMONDS 1h 121 5 Avenue North Edmonds, WA 98020 Phone: 425.771.0220 Fax: 425.771.0221 - Web: www.ci.edmonds.wa.us S4"PLF_- DEVELOPMENT SERVICES DEPARTMENT: PLANNING DIVISION ADMINISTRATIVE DESIGN REVIEW -STAFFDECISION- ADB-2007-72: Application by Mike Adams of Taylor Gregory Butterfield Architects, representing Terrence Conway of CRE Properties, for design review of a new office/warehouse building on a currently undeveloped parcel, located at 21020 701h Avenue West in the General Commercial (CG2) zone. Property Owner: Terrence Conway CRE Properties 210207 01h Avenue West Edmonds WA 98026 Site Location: Applicant. Mike Adams Taylor Gregory Butterfield Architects 21911 76h Avenue West — Suite 2 10 Edmonds WA 98026 21020 701h Avenue West in the General Commercial (CG2) zone (see map below) Project Proposal: The proposal is for a new 9,000 square foot wood - framed single story building with a two-story wing on a currently undeveloped parcel. 7,500 square feet will be used for manufacturing (a screen print shop) and 1,500 square feet will be used for office space. A SEPA Determination (DNS) was issued on November 8, 2007 and no comments or appeals were received. Design Review Process: ii TH S I SW 111 memo Gc TH T SW t �t C/ yl V The subject site is in the General Commercial (CG2) zone, and this project requires District -Based Design Review by staff. Projects that remain under the height limit are reviewed by staff with the building permit process, and the design review is considered an administrative Staff Decision subject to the requirements of ECDC 20.12 (District -Based Design Review), 20.95 (Staff Decision), 16.60 (General Commercial), and the Comprehensive Plan. Page I of 6 ) 0 Staff Report for ADB-2007-72 CRE Properties: Officj;!Wareh-pse 1�0 Analysis: A. Facts: 1. The improvements are proposed on property with a General Commercial zoning designation (CG2). t 2. ECDC 16.60.030 states that design review by the Architectural Design Board is required for any project that includes buildings exceeding 75 feet in height in the CG2 zone. Projects not exceeding these heights may be reviewed by staff as a staff de ' cision. Regardless of what review process is required, all projects proposed in the CG2 zone must meet the design standards contained in ECDC 16.60. 3. The building is well under the 75-foot height limit; it is approximately 26 feet tall (Attachment 6). 4. The commercial warehouse (a screen print shop) is the primary use of the site, accompanied with an office use. 5. The immediate proposal is to construct a new 9,000 square foot wood -framed single story building with a two-story wing on a currently undeveloped parcel. 6. The applicant has recently obtained approval for a lot line adjustment (LLA) between this site and the parcel to the east (File LL-2007-78). This map has been recorded under file #200711155002. 7. A Critical Areas Deten-nination was made for the property under file #CRA-2007-126. It was determined that there are no critical areas on or adjacent to the property; therefore, no critical areas reports will be required. 8! A SEPA Determination (DNS) was issued on November 8, 2007. No comments or appeals were received (Attachment 2). % The table below shows the required (and proposed) setbacks for structures in the CG2 zone. CG2 Side Side Side Side Zone (North) (South) (East) (West) Required 0 0 0 0 Setbacks Proposed 7' 2' 9 1/4 91 5' 9" Setbacks 10. The Comprehensive Plan designation for this site is "Highway 99 Corridor," and it is also located both within the "Medical/Highway 99 Activity Center" and the "Hi -Rise Node." 11. For this project, the grading will require approximately I 10 cubic yards of excavation and approximately 65 cubic yards of fill — the DNS has allowed up to 1,000 cubic yards of cut or fill (Attachment 2). * ECDC 16.60.030.A.2.a states that "Type W landscaping, minimum four feet wide, is required along all street frontages." The property has twelve feet of street frontage and contains parking, and the site plan shows approximately 136 square feet of landscaping (approximately 8 feet wide by 17 feet deep). Page 2 of 6 I 'I , 4 Staff Report for ADB-2007-72 CRE Properties: 0ffi(&War*Pse 12. The applicant has stated that there will be 10 employees on the largest warehouse shift, which requires 5 parking spaces pursuant to ECDC 17.50.020.B. 15. There will be approximately 1500 square feet of new office space, which some of the warehouse employees will use. The parking ratio for office space requires 3.75 parking spaces pursuant to ECDC I 7.50.020.B.5. Total on -site parking required by code is nine (8.75) parking spaces. The site plan shows that 10 parking spaces are provided (Attachment 3). 13. There are no adjacent residential ly-zoned properties. 14. There are several Comprehensive Plan goals and policies for commercial development (some are specific to the Medical/Highway 99 Activity Center). These include: "The City will encourage the retention of commercial uses which provide high economic benefit to the city, such as new auto dealerships, and encourage these types of uses to locate within the Highway 99 Corridor. " (Page 48) Design Objectives for Building Form: "Building height and modulation guidelines are essential to create diversity in buildingforms, minimize shadows cast by taller buildings upon the pedestrian areas and to ensure compliance with policies in the city's Comprehensive Plan. Protecting viewsftom public parks and building entries as well as street views to the mountains and Puget Sound are an important part ofEdmonds character and urbanform. (Page 77) Highway 99 — General Appearance: "Creation of a new identity. Development of high intensiry nodes. Better identification of businesses by numbering. Encouragement ofplanned business centers and design coordination among neighbors. Buildingforms compatible with adjacent uses. Parking areas more clearly defined to eliminate confusion of driveways, street andparking areas. Unsightly uses and storage screened by landscaping andJencing. " (Page 79) 15. The office/warehouse is the proposed commercial land use, which is encouraged by the above Comprehensive Plan policy. 16. The parking area is clearly defined. 17. There are no known local views in the vicinity. 18. The height of the proposed new building is relatively small at approximately 26 feet. 19. ECDC 20.13.030.0 defines "Type III Landscaping" as follows: "Type IIIlandscaping is intended to provide visual separation of usesftom streets, andvisual separation of compatible uses so as to soften the appearance of streets, parking areas and building elevations. " 20. Type III landscaping is not shown along the North, South, East, and West sides on the landscape plan (Attachment 4). 21. Pursuant to ECDC 20.13.030.C. I and 2, the following two ways of providing Type III landscaping are applicable to this project: " 1. Evergreen and deciduous trees, with no more than 50 percent being deciduous, a minimum of sixfeet in height, andplanted at intervals no greater than 30feet on center; and 2. Ifplanted to buffer a building elevation, shrubs, a minimum of three and one-halffeet in height, and living ground cover planted so that the ground will be covered within three years. Page 3 of 6 f �,;. 0 Staff Report for ADB-2007-72 CRE Properties: Officv,/Warelwse 22. ECDC 16.30.030.A. Lk states, "when no setback is otherwise required, Type III landscaping threefeet in width and continuous in length is required between uses in the same zone. " There is no setback otherwise required for this property. 23. The site plan shows an "existing retaining wall" along the south property line. 24. ECDC 17.30.00013 states, "When a retaining wall three feet in height or greater is contiguous to and below a proposed fence, the proposed fence may be constructed for the purposes of safety not greater than four feet above the top of the retaining wall or the finished grade, whichever is less, without the necessity for a variance." 25. The site plans shows that there is less than three feet between the south elevation and the south . property line. 26. The site fronts is tucked behind a property that fronts on 70th Avenue West. 701h Avenue West is considered a "Local Street." 27. No street trees are required for properties fronting on 70th Avenue West. 28. The project proposes a 30-year composition shingle roof in the color "weathered wood" (Attachment 7). 29. The project proposes hardiplank lap siding in a "pebblestone beige" color on the bottom half of the building. Alternatively, the upper portion of the building proposes board and battens applied vertically and painted in the same color. The wood exterior door will be painted "copper mine." The window, belly band, and comer trim are shown painted "tudor brown." B. Conclusions: 1. The colors chosen are of a neutral color palate and are an appropriate fit for the building and neighborhood, 2. The project appears to meet the design standards in the code (ECDC 16.60), however all development standards will be reviewed with the building permit. 3. The project appears to meet the parking requirements for off-street parking (Attachment 3). 4. This project meets the design guidelines found in the Comprehensive Plan and the design review chapter of the Edmonds Community Development Code (ECDC) 20.12. 5. A building permit for the proposed improvements will need to be approved prior to construction. 6. The Landscape Plan will need to show additional landscaping in order to meet ECDC 20.13. Specifically, the plan will need to be revised to show "Type 111" landscaping along the west property line, along the north property line, along the northern portion of the east property line (where it borders the building). Planning staff would consider approving a landscape plan that "clustered" the landscaping more along the north and west elevations, as long as the overall planting density is met. 7. 1 If the existing retaining wall along the south property line is less than 3.5 feet in height (as measured from top of wall to original grade), one way to meet intent of "Type 111" landscaping along the south property line is to have a 3.5 foot opaque fence along this property line. Page 4 of 6 Staff Report for ADB-2007-72 CRE Properties: Offiqe/Ware!iause Technical Review: The Engineering Division, Building Division, Fire Department, Public Works Department, and the Parks & Recreation Department have reviewed this design review application. The Engineering Division requested a Traffic Impact Analysis from the applicant. Said analysis was submitted and reviewed by the Engineering Division. Public Comments: The City has not received any comment letters for this project. Decision: Based on the facts, conclusions, and attachments to this report, staff finds that the design review for this project (file number ADB-2007-72) is APPROVED with the following conditions: 1. The applicant must obtain a building permit for the proposed work, and individual elements of this project are required to meet all applicable city codes. 2. The Landscape Plan shall be revised to show "Type 111" landscaping around the north, south, east, and west sides of the property per ECDC 20.13. Planning will consider an approach that would cluster the landscaping along the north and west property lines. An opaque fence 3.5 feet in height along the southern property line would satisfy the "Type 111" requirement. I have reviewed the application for compliance with the Edmonds Community Development Code. Gina Coccia, Planning Division Attachments: 1. Land Use Application 2. SEPA Determination 3. Site Plan (A 1.00, SV 1.00) 4. Landscape Plan (LI.00) 5. Floor Plans (A2. 10) 6. Elevations (A3.00, A4.00) 7. Color Samples Date Page 5 of 6 Staff Report for ADB-2007-72 CRE Properties: Officq4WarehWse Appeals and Expiration: The following is a summary of the deadlines and procedures for filing appeals and extensions. Any person wishing to file an appeal or extension should contact the Planning Division at 425.771.0220 for further procedural information. Appeals — Section 20.12.080 describes how appeals of administrative design review shall be made. ECDC 20.12.080.C: Design review decisions by staff under the provisions of ECDC 20.12.030 are only appealable to the extent that the applicable building permit or development approval is an appealable decision under the provisions of the ECDC. Design review by staff is not in itself an appealable decision. ECDC 20.12.080.D: Persons entitled to appeal are (1) the applicant; (2) anyone who has submitted a written document to the city of Edmonds concerning the application prior to or at the hearing identified in ECDC 20.12.020(B); or (3) anyone testifying on the application at the hearing identified in ECDC 20.12.020(B). Lxpiralion — Section 20.12.90 describes the time limitsfor design review approval. ECDC 20.12.090.A: Unless the owner submits a fully completed building permit application necessary to bring about the approved alterations, or, if no building permit application is required, substantially commences the use allowed within 18 months from the date of approval, ADB or hearing examiner approval shall expire and be null and void, unless the owner files a fully completed application for an extension of time prior to the expiration date. Page 6 of 6 CONSTRUCT CB OVER EXISTING PIPE CONTR4CTOR T6 VERIFY LOCATIONS\ tIVITH NO CAP AND DEPTH. -NOTIFY ENGINEER FOR NORTH, DISCREPANCIES AND CAP, Ty �T FF=413.56 OF /RETAIL," 12" SO 00.5% C 3,330 S.F. REAR SIDEWALK cl "A ICE R1110 ADS "7 Z' 1"' PCP (Ep. /I V. 'S� TO BE 6 SO 58LF 12" SO 4.31% 97 Cm 2 ?M=412.75-+ �IE=409.50 53 / 4 4� Cm so, FF=415.60 RIMz�111.00 10 IL=408.00 t 4 0 C6 Z' RETAIL B 2' SD 00.5% v REFAINING -11000 S.F.// 10' UTILITY EASEMENT BE ANDONED 7.1- vv 411. 54 E, EFIL =41-71 34 JOLF 12- SO 0 0.56% :7 CB#1 RIM=409.50 0. IE=404.65 ------------ a It CB RiAli 4;, 5, 0, If 8 40%- -4 T - r—. - — PIPE L TRASH ENCLOSURF 5111 F 112" Rcp (s) ONS W44 DRAIN INTO C Y1 FOR N D 00.5% 144L 12" �D'OiO-91% 00 0#3 R) S&- I � 73.871 11�� 101 SIA: 2+83.60 RIM=41J.98 A 4?9. _j! +62.72 SIA: 2+31.82 S 'NS RIM=408.00 7OR RIM=409.47 IE=405.65 IF=404.90 CONSTRUCT CB L,1 IOVER EX, PIPE _4 Y FF=414.00 �E + _7 It i;� /R TAII A KON B RIM 407.52' 1 13 4,600,'S.F. RCP N = 404.72' /9 12 RCP (E) = 404.61 7RELO&W EX. R AND POWER POLE P. CAP -io 81 �581 ON LP Wr AT j0 07, 42.3111 RUNE OF STA: 18+55. 7T 24' 1: 12 MWAX SWPE�' MATCH TO EX. CURB & SIDEWALK ACP R4MP_ d 65 'L. DEVELOPED BASIN BOUNDARY 7/T AREA 1.37 AC S PROPOSED IA: 0+ 18 0� (:)� + FOG LINE ZE t 457.34' N 8T 71- 1­41 MATCH EXIST_.� _5�:21 10�92.146 �'V -10 oj'V W - - h - 10 5-10 '234 TREE .55 W T SITE ADDRESS- 234th ST. SW & HWY. 99 EDMONDS, WA 98020 TAX ACCOUNT NO.'S: 00576700002002 sw 114, M 1A SEC-31, T.22N., R.4E., IF.M. A-2 at EDMONDS REV. BY DA IE PRaECT MANAGER SCALE ALD 11121107 1 BRK 1.�_ I UMA YANG FILENAME 1EC NO. 07-04431bwclbEscNlbv-BASKMAP.dwg 07-0443 SHEE'T B2 DEVELOPED BASIN MAP Of 2 LEGEND BASN BOUNDARY GRAPHIC SCALE 3 0 0 15 30 60 ( IN FEET ) - 1 inch 30 ft. 3630 COLBY AVE., (425) 303 EVERETT, WA 98201 m93 6S3 4G2 30 -9362 FAX IN 16ML &WGI� REV ma mnas DA 1E '-p 759 mw 7 L, FIM 404,3?� 4 0"'/ 0-'. T6 225LF SHEET FLOW 08.88X , 7- 1 4i Qi cb' 5 EX. FH :70.:7- -1.7 C I v C AA, C OF ss 14, f EX. SD (TBR) CE? RIM 410.51 § 12 RCP (W = 406.91 I RCP (5) = 406.81' h A /01 b, A, 21 i 'y .1 h T U. FH — — — mw - I -'- . N Q:) EXIs-nNG BASIN BOUNDARY— N 8;r5g'21 E 457-34' #/ AREA 1.37 AC ov sTREETSW 234 TH WE ADDRESS. 234th ST. SW & HWY. 99 EDMONDS, WA 98020 TAX ACCOUNT NO.'S.- 00576700002002 sw 114, 19 A STC-31, T.27N., R.4R., W.M. A-2 at EDMONDS REV. BY DAIE I PR&JECT MANAGER SCALEJO, ALD 11121107 BRK 1*= 10RAWNG RLENAME I IEC " NO. I LEGEND m m m m 0 BASN BOUNDARY 50 GRAPHIC SCALE 30 0 15 30 60 IN FEET 1 inch = 30 f t. SqEET Bl EXISTING BASIN MAP Of 1 2 3630 COLBY AVE., (425) 303 EVERETT, WA 98201 ,;m9363GwL4gWm3'03 9362 FAX Am An I amow" ofinvs I DAM kj FOUND CONCRETE MONUMENT WITH 1.75" BRASS DISC AND PUNCH, 0.3' DEEP IN MONUMENT CASE 2­90'91' E FOUND REBAR WITH NO CAP x 1.0' EAST AND 1.2' NORTH OF CORNER. FOUND REBAR AND CAP, LS#37527 ON PROPERTY LINE, 2.0' E4ST OF CORNER. a t 11 --AM I REAR SIDEWALK INV. 3" ADS = 427.2'— RETAINING XALL--�` 10' SEWER EASEMENT 61) \%T 0, 1011, @ as . ruvvr-n rt FOUND REBAR AND CAP 'EMERALD LSJO581' ON PROPERTY LINE AT 30' FROM CENTERLINE OF 234TH STREET SW. 1: 12 MAX. SL ACP RAMP�- STA:9+ 6.50,13.651 A� 00 MATCH TO I _,PP EX. CURB 7 7 vv / , PROPOSED FOG LINE MATCH EXIS .29 - ------- _J� �4 — — SD \SSMH RIM = 445.80' 8" PVC N, E, & W CTR CHANNEL -- 437.90' FOUND CONCRETE MONUMENT WITH 1.75" BRASS DISC AND PUNCH, 0.5' DEEP IN MONUMENT CASE. ELEVATION = 461.63' b71LflTC0)VFL1CTN0TE.- CA MON. - THE CONTRACTOR SHAIJ BE RESPONSIBLE FOR VERIF)ING THE LOCARON, DIMENSION, AND DEPTH OF ALL LXIS77NG UTILITIES WHETHER SHOWN ON THESE PLANS OR NOT, BY POTHOLING IHE UTILITIES AND SURVEYING THE HORIZONTAL AND VERTICAL LOCATION PRIOR TO CONSTRUCTION. THIS AND THEN SHALL INCLUDE CALLING UTILITY LOCATE @ 1-800-424-5555 POTHOLING ALL OF THE EXIS71NG UTILITIES AT LOCA77ONS OF NEW UTILITY CROSSINGS TO PHMCAII Y VERIFY WHETHER OR NOT CONFLICTS EXIST. LOCATIONS OF SAID U71UTIES AS SHOWN ON THESE PLANS ARE BASED UPON THE UNVERIFIED PUBLIC INFORMATION AND ARE SUBJECT TO VARIATION. F CONFLICTS SHOULD OCCUR, THE CONTRACTOR SHALL CONSULT WITH INSIGHT ENGINEERING COMPANY TO RESOLVE ALL PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION. CALL TWO (2) BUSINESS DA YS BEFOREYOU DIG 1-800-424-5555 Amw cs, I N�N 8.75921" k 457.34'� — f_� W I W T7_ � 2ArU 4Z S _7� SIG -7 'PP wM N S W 114, AE 114, SEC. 31 9 T. 2 7 N. 9 R. 4 E. � W.M. SNOHOWSHCOLMY, WASMVGTON w E S 30 29 1,209'.* L__+3132 EAST t / vl� c 41 c) cl:� ul, SO, 231 H ON, PR - --- ---- ---- /N 87*59,'21" E ?60.61 E242ND SCA-LE: 1 30' 4 OEM 30 15 0 30 60 3,330 S.F. C1 '77 J_ 177 404.32' CB RIM 12 RCP (E, . . . . . . . . . . . j Cb A5 IA� wv 0 !41;­;'1 F CO J, 4. W STA: 2+83.60 L IG 8 RIM 407. 2' 12 RCP N = 404.72' 12" RCP (E) = 404.162' STA: 18+55.07, 42.31,v .�-MATCH TO D(. CURB & SIDEWALK I RIM = 411.54' VC N,' S,. k W CHANNEL 401.001 .SBEETINDEX C1 COVER SHEET C2 DEMOLITION PLAN CJ TESC & GRADING PLAN C4 ROAD & DRAINAGE PLAN C5 DETENTION PLAN SWI SEWER AND WATER PLAN LVVE TABLE LNE LENGTH BEARING L1 128.27 NO2J442"W L2 42.28 N87*25'18"E L3 66.44 S66'00'23"E CURVE TABLE CUR VE LENGTH RADHJS DELTA C1 72.26 46.00 90,00,00" C2 16.23 35.00 26*34'19" CffYOFEDMOI)IDS APPROVED FOR CONSM UCTION C.- .LEGEND EXISTING MONUMENT (AS SHOWN) PROPOSED MONUMENT + SECTION CORNER a FOUND REBARICAP OR I.P. (IRON PIPE) TOR TO BE REMOVED P.O.B. POINT OF BEGINNING EOP EDGE OF PAVEMENT ff�] CB STORM DRAIN CATCH BASIN (55DMH STORM DRAIN MANHOLE @SSMH SANITARY SEWER MANHOLE 0 co SANITARY SEWER CLF_4N OUT 1(:�PP POWER POLE E UTILITY POLE ANCHOR 03 WM WATER METER >< wv WATE9 VALVE PMB MAILBOX '0 FH FIRE HYDR4NT (2 NOZZLE) TYPE I NGPA SIGN NO PARKING SIGN R.O.W.- RIGHT-OF-WAY CENTERLINE EXISTING DITCH — — — — — — — — BUILDING SETBACK LJNE (BSBL) PROPERTY LINE —X—X— EXISTING FENCE LINE EDGE OF EXISTING PAVEMENT XXX - - - - - - - - - - - EXISTING CONTOURS rx—_xxl PROPOSED CONTOURS PRE­fX1S77NG DPAINAGE FA, PROPOSED PWPOSED NOTES: 1. THIS SURVEY HAS BEEN PREFA THE EXCLUSIVE USE OF PARTIES WHOSE NAMES APPEAR ONLYAND DOES NOT EXTEND TO ANY UNNAMED THIRD PAR THOUT EXPRESS RECERTIFICATION BY 774E LAND SUR Z BOUNDARY LINES SHOWN AND CORNERS SET T DEED LOCATIONS, OWNERSHIP LINES MAY VARY. NO 0 OF OWNERSHIP IS EXPRESSED OR IMPLIED THIS SURVEY FORMED WITHOUT THE BENEFIT OF A TITLE REPORT A D DO URPORT TO SHOW ALL EASEMENTS, RESTRIC77ONS, R OCCUPA77ON WHICH MAY ENCUMBER 777LE TO OR OF PROPERTY. 3. FOR LANDSCAPING SEE SEPAR47E LANDSCAPE PLAN. 4. MONUMENTS SHALL BE FOUND ANDIOR SET ACCORDING TO EDDS 4-03. SEE SHEET C3. 5. PROPOSED FIRE HYDRANTS SHALL BE IN SERVICE PRIOR TO ANY COMBUSTIBLE CONSTRUCTION. 6. SIGNAGE OR PAVEMENT STRIPING SHALL BE PROWDED ALONG THE DRIVE AISLE FOR INO PARKING —FIRE LANE,- AT 77ME or COMPLETfON. Z ALL HOMES WILL BE PROVIDED WITH NFPA 13—D FIRE SUPPRESSION 2 REVISIONS PER ARCH17ECT SJR 105-13-2 1 REVISIONS PER CITY OF EDMONDS SJR 03;pQ REV. NO. DESCRIPTION INMALS , rDATE W I f—fc F—EXPIRES 11 /30/2008 j I i� , CO Lake Ballinger, _cvVi7y" SCALE. 1"4000' EQ UIPMEA T A MD PR 0 CED URE METHOD OF SURVa- SURVEY PERFORMED BY FIELD TRAVERSE INSTRUMENTATION. LEICA TCR4 1105 ROBOTIC ELECTRONIC TOTAL STATION PRECISION. - MEETS OR EXCEEDS STATE STANDARDS WAC 332-130-090 BASIS OF BEARING. THE MONUMENTED CENTERLINE OF 234TH STREET NE, AS THE BEARING OF N 875921" E CONCRETE MONUMENT WITH 1.75' BRASS DISC AND PUNCH, 0.5' DEEP IN MONUMENT CASE, ("ch BM IN CENTERLINE OF Z34TH, J20' WEST OF sim 19V ELEVATION 461.63' DA NAVD 68 .ENGNEER SURVErOR INSIGHT ENGINEERING COMPANY FACIRC COAST SURVEYS, INC. 3630 COLBY AVENUE P.O. BOX 3286 EVERETT, WA 98201 EVERETT, WA 98213 CONTACT. BRIAN R. KALAB (425) 508-4951 (425) 303-9363 FAX (425) 357-3577 FAX (425) 303-9362 ARCHMECT OWNER THOMAS 7HOMPSON M 29619 15th AVENUE NE STMWOOD, WA 98292 (360) 629-3985 FAX (360) 629-5435 Af ��Aff A—Z 0 NDS LLC. 23723 1 th PL W ELPSHOR WA 98020 9 0 6) 5 —4411 A AX X (2 ) 542-9654 A CLAY EMPRISES LLC. 2002 196th ST SW LYNNWOOD, WA 98036 SOUTH 224FEEF OF' THE F LYING WESTERLY OF S ROAD THE SOU BEING THE INTERSECTIO 0 THE WESTERLY OF THE WES LINE OF SAID A ACCORDING CT 20, SKELTON' E A�,11 PLAT THEREOF P PAGE RECORDS OFSNOHO CO TON. PARCEL B ALL SITUATED IN THE COUNTY OF SNOHOMISH, STATE OF WASHINGTON. FOR: , PUBLIC WORKS DIRECTOR DATE SW 1149 AE 114, SEC. 31, T. 27 Xq R. 4 E.9 W.M. SNOHOMISH COUNTY, WASHWGTON FOUND CONCRETE MONUMENT WITH 1.75" BRASS DISC AND PUNCH, 0.3' DEEP IN MONUMENT CASE. N 875921" E _J!;�4�.2 8" PVC N, E, & W CTR CHANNEL = 437.90' FOUND CONCRETE MONUMENT WITH 1.75" BRASS DISC AND PUNCH, 0.5' DEEP IN MONUMENT CASE. ELEVATION = 461.63' FOUND REBAR WITH NO CA 1.0' EAST AND 1.2' NORTH OF CORNER. FOUND REBAR AND CAP,- LSJJ7527 ON PROPERTY LINE, 2.0' EAST OF CORNER. INV. 3" ADS = 427.2' TO BE MUNDONED @ SSMH RIM=411.54'(MR) 4 8" PVC N, S, E, & W @00 CTR CHANNEL =413.84' (rs FOUND REBAR AND CAP 'EMERALD LS30581' ON PROPERTY LINE AT 30' FROM CENTERLINE OF 234TH STREET SW. t t t �v goo SO, RD E 60.6 1'� IN 87*59 1 T7T, rp $7 f -Opp (2) WV PROPOSED c)� FOG LINE Trn INE MATCH EXIST.-' N A7*5��21_1 451-,) jr/ifiv W I - ENTER I —OF R w I A9. t 234 TH 5 sT ss 'I-- _� I I SIG�N 3 ,B RIM = 434.48' 12" DI (E) = 431.58' 12" DI (W) = 431.48' \/ N �n ni. J — A 4 7 0 -7' . 4 CB RIM 404.32' SCALE: 1" 30' 12 R C P (E) = 462. t 02' MEM OEM is 0 30 60 CB RIM 410.51 12 RCP W 12 RCP 406.81' 407. N = 04.72 (E) = 4.62' UTIL[7]7 CONFLICTNOTE.- CA UTION. - THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, DIMENSION, AND DEPTH OF ALL D(ISTING 077LITIES WHETHER SHOWN ON THESE PLANS OR NOT, BY POTHOLING THE UTILITIES AND SURVEYING THE HORIZONTAL AND VERTICAL LOCATION PRIOR TO CONSTRUCTION. THIS AND THEN SHALL INCLUDE CALLING UTILITY LOCATE 0 1-800-424-5555 POTHOLING ALL OF 7HE EXISTING UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY VERIFY WHETHER OR NOT CONFLICTS EXIST. LOCA77ONS OF SAID UTILITIES AS SHOWN ON THESE PLANS ARE BASED UPON THE UNVERIFIED PUBLIC INFORMATION AND ARE SUBJECT TO VARIATION. IF CONFLICTS SHOULD OCCUR, THE CONTRACTOR SHAI I CONSULT WITH INSIGHT ENGINEERING COMPANY TO RESOLVE ALL PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION. k c. 6 cd N FOUND RERAR WITH NO CA 1.0' EAST AND 1.2' NORTH OF CORNER. FOUND REBAR AND CAR- LS#37527 ON PROPERTY LINE, 2.0- EAST OF CORNER. SCALE: I"= 30' lomm Elm ommmmam I mm om EMEMEEM I REAR SIDEWALK 30 15 0 30 60 INV. 3" ADS = 427.2'- RETAINING WALL--` 10' SEWER 428� EASEMENT as Z_ PROPOSED MATERMLS SrOPA JOB IMLER ErC. LOCATION. FOUND REBAR AND CAP 'EMER4LD LSJ0581' ON PROPERTY LINE AT 30' ci.- FROM CENTERLINE OF 234TH STREET SW. 1:12 SL ACP P­ FOUND CONCRETE IA�9 +,�6�.Q, 13. 651 MATCH TO MONUMENT WITH 1.75 1 _,,PP EX. CURB BRASS DISC AND PUNCH, 0.3' DEEP IN T, PROPOSED MONUMENT CASE. FOG LINE MATCH EXIST.-, N 8;r5g'21" E )PAINTED ENTERLINE 394.29 - ------- TER INE70F ROJT, W vv Itu `��S­SMH IrIM =445.80' 8" PVC N, E, & W CTR CHANNEL = 4.37.90' FOUND CONCRETE MONUMENT WITH 1.75" BRASS DISC AND PUNCH, 0.5' DEEP IN MONUMENT CASE ELEVATION = 461.63' FILTER FABRIC - SECURED TO 2' X 2' 14 GA, WIRE FABRIC EQUAL 2' X 2' WOOD OR EQUIVALENT N -PP CB RIM = 434.48' 12 " DI (E) 431.58' 12 " DI (W) 431.48' FILTER FABRIC MATERIAL IN CONTINOUS ROLLS. USE STAPLES OR WIRE RINGS TO ATTACH FABRIC TO WIRE. WIRE MESH SUPPORT TO SUPPORT FILTER I = , *1� =fp 11;4 1" IFJ 8'- 12' jj! zo - -I Fc -- - - - - - - - - - - Cu URY BOTTOM OF FILTER MATERIAL 8' TO 12- 8# 6' MAX. PLACE 3/4'-1.5' WASHED GRAVEL IN Li THE TRENCH AND ON BOTH SIDES OF 2' X 2' WOOD POSTS OR FILTER FABRIC FENCE ON THE SURFACE. EQUIVALENT CONTRACTOR/DEVELOPER SHALL MAINTAIN AND REPLACE STRAW BALES TO INSURE PROPER EROSION CONTROL. 234TH 5 SIGNIP4 ol CIN CN sb "s 117Sj c NOTES (ECDC 18.30.050) S W 1149 ArE 114, SEC. 319 T 2 7 X, R. 4 E. 9 W. M, SNoHoqVffSH COL)7VTy A, ESC MINIMUM REQUIREMENTS ALL AC71VMES NECESSITATING A CLEARING OR GRADING PERMIT AND ALL UTILITY WASHUTGTON PROJECTS CONSIS77NG OF MORE THAN 500 LINEAL FEET OF TRENCH EXCAVATION SHALL BE REQUIRED TO CONTROL EROSION AND SEDIMENT DURING CONSTRUCTION AND TO PERMANENTLY STABILIZE EXPOSED SOIL RESULTING FROM CONSTRUCTION. PROJECTS INVOLVING A CRITICAL AREA MAY ALSO BE REQUIRED TO COMPLY WITH ANY COMBINA77ON OF THE ESC MINIMUM REQUIREMENTS. COMPLIANCE WILL BE DEMONSTRATED THROUGH THE IMPLEMENTA71ON OF AN APPROVED ESC PLAN. GUIDELINES FOR PREPARING ESC PLANS ARE PROVIDED IN THE MANUAL. THE PLAN MUST ADDRESS THE FOLLOWING REQUIREMENTS. 0 c) C., CL c� (6 SO, 1. ESC MINIMUM REQUIREMENT - CONS7RUCTION ACCESS ROUTE. CONSTRUCTION VEHICLE ACCESS SHALL BE, WHENEVER 11 iBILLBOARD PRACTICAL, LIMITED TO ONE ROUTE. ACCESS POINTS SHALL BE STABILIZED WITH QUARRY SPALLS OR CRUSHED ROCK --- - ---- ---- TO MINIMIZE THE TRACKING OF SEDIMENT ONTO PUBLIC ROADS. IF SEDIMENT IS TRANSPORTED ONTO A ROAD SURFACE, ,N qr5g.21" E 260.61' THE ROADS SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM ROADS BY SHOVELING OR SWEEPING AND BE TRANSPORTED TO A CONTROLLED SEDIMENT DISPOSAL AREA WITHIN 24 HOURS. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS, MANNER. 2 ESC MINIMUM REQUIREMENT - STABILIZATION OF EXPOSED AREAS ALL SOILS EXPOSED BY LAND DISTURBING AC71VITIES SHAH BE STABILIZED BY SUITABLE APPLICA77ON OF BMPS, INCLUDING, BUT NOT LIM17ED TO, SOD, HYDROSEEDING, OR CC;;/_T OTHER VEGEIATION, PLASTIC COVERING, OR MULCHING. ALL BMPS SHALL BE SELECTED, DESIGNED, AND MAINTAINED IN /mcp�o :ESC ACCORDANCE WITH THE MANUAL THE EXPOSED SOILS SHALL BE STABILIZED ACCORDING TO AN APPROVED TIMETABLE. (TYPICALLY, NO SOILS SHALL REMAIN EXPOSED FOR MORE THAN TWO. DAYS FROM OCTOBER I THROUGH APRIL 30 AND EMERGENCY NO MORE THAN SEVEN DAYS FROM MAY 1 THROUGH SEPTEMBER 30). SPIUNAY 3. ESC MINIMUM REQUIREMENT - PROTECTION OF ADJACENT PROPERTIES. ADJACENT PROPERTIES SHALL BE PR07ECTED FROM SEDIMENT DEPOSITION BY APPROPRI47E USE OF VEGETATIVE BUFFER STRIPS, SEDIMENT BARRIERS OR FILTERS, DIKES OR MULCHING, OR BY A COMBINAIION OF THESE MEASURES AND OTHER APPROPRIATE BMPS. CB RIM = 404.32' 4. ESC MINIMUM REQUIREMENT - MAINTENANCE. ALL EROSION AND SEDIMENT CONTROL LIMPS SHALL BE REGULARLY 12 " RCP (E) = 402.027 INSPECTED AND MAINTAINED BY THE OWNER TO ENSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNC770N. ALL MAINTENANCE AND REPAIR SHALL BE CONDUCTED IN ACCORDANCE WITH THE MANUAL. Al 5. ESC MINIMUM REQUIREMENT - 07HER LIMPS. AS REQUIRED BY THE CITY, OTHER APPROPR14TE` BUPS TO MITIGATE THE EFFECTS OF INCREASED RUNOFF SHALL BE APPLIED. 4� 6. EROSION AND SEDIMENT CONTROL REQUIREMENT - UNDERGROUND UTILITY CONSTRUCRON. 7HE CONSTRUC71ON OF I 11Q i 44 UNDERGROUND OTIL17Y LINES SHALL SPECIFICALLY ADDRESS THE FOLLOWING - A. EROSION CONTROL FOR EXCAVATED AND STOCKPILED MATERIALS, U s" DC B. THE PLACEMENT OF EXCAVATED MATERIAL WHERE CONSISTENT WITH SAFETY AND SPACE CONSIDER47IONS SHALL BE A. wv PLACED ON THE UPHILL SIDE OF TRENCHES, C TRENCH DEWATERING SYSTEMS (MUST DISCHARGE INTO SEDIMENT TRAPS, SEDIMENT PONDS, OR OTHER ACCEPTABLE MEANS), 00- D. TRACKING AND SPILLING OF MATERIALS ON STREETS DUE TO HAULING, E DAILY CLEANUP AND STREET MAINTENANCE. Z ADDITfONAL ESC MINIMUM REQUIREMENTS FOR LARGER DEVELOPMENTS. ALL NEW DEVELOPMENT AND: REDEVELOPMENT THAT INCLUDES LAND DISTURBING AC77VMES OF GREATER THAN, OR EQUAL TO, ONE ACRE IN ADDITION TO MEE77NG THE MINIMUM REQUIREMENTS SET FORTH ABOVE SHALL COMPLY Wf7H ESC REQUIREMENTS LISTEDI BELOW. _1P 8. ESC MINIMUM REQUIREMENT - Damw CLEARING AND EASEMENT LIMITS. IN THE FIELD, MARK CLEARING LIMITS ANDIOR ANY EASEMENTS, SETBACKS, SENSIRVEICRITICAL AREAS AND THE BUFFERS, TREES AND DRAINAGE COURSES. 9. ESC MINIMUM REQUIREMENT - SEDIMENT TRAPPING. PRIOR TO LEAWNG THE SITE, STORM WATER RUNOFF SHALL PASS THROUGH A SEDIMENT POND OR SEDIMENT TRAR OR OTHER APPROPR14TE BMPS. SEDIMENT PONDS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS, AND OTHER BMPS INTENDED TO TRAP SEDIMENT ON -SITE SHALL BE CONSTRUCTED AS A FIRST STEP IN GRADING. THESE BMPS SHALL BE FUNC77ONAL BEFORE LAND DISTURBING AC71VI77ES TAKE PLACE. EARTHEN STRUCTURES; SUCH AS DAMS, DIKES, AND DIVERSIONS SHALL BE SEEDED AND MULCHED ACCORDING TO AN APPROVED TIMETABLE 10. ESC MINIMUM REQUIREMENT - CUT AND FILL SLOPES. CUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTED IN A MANNER THAT WILL MINIMIZE EROSION. IN ADDMON, SLOPES SHALL BE STABILIZED IN ACCORDANCE WITH ESC + REQUIREMENT NO. 2. PO UC71ON 11. ESC MINIMUM REQUIREMENT - CONTROLLING OFF -SITE EROSION. PROPER77ES AND WATER WAYS DOWNSTREAM FROM D�MCE DEVELOPMENT SITES SHALL BE PROTECTED FROM EROSION DUE TO INCREASES IN THE VOLUME, VELOCITY, AND PEAK FLOW RATE OF STORM WATER RUNOFF FROM THE PROJECT SITE. 12. ESC MINIMUM REQUIREMENT - STABILIZ47ION OF TEMPORARY CONVEYANCE CHANNELS AND OUTLETS. ALL TEMPORARY If ON -SITE CONVEYANCE CHANNELS SHALL BE DESIGNED, CONSTRUCTED AND STABILIZED TO PREVENT EROSION FROM THE EXPECTED VELOCITY OF FLOW FROM A TWO-YEAR, 24-HOUR FREQUENCY STORM FOR THE DEVELOPED COND17ION STABILOTION ADEQUATE TO PREVENT EROSION OF OUTLETS, ADJACENT STREAM BANKS, SLOPES AND DOWNSTREAM REACHES SHALL BE PROWDED AT 7HE OU71E7S OF ALL CONVEYANCE SYSTEMS. 13. ESC MINIMUM REQUIREMENT - STORM DRAIN INLET PROTECTION. ALL STORM DRAIN INLETS MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED SO THAT STORM WATER RUNOFF SHALL NOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR OTHERWISE TREATED TO REMOVE SEDIMENT �B RIM 407.52' 14. ESC REQUIREMENT - REMOVAL OF TEMPORARY BMPS. ALL TEMPORARY EROSION AND SEDIMENT CONTROL BMPS SHALL 12 RCP N = 4N.777 BE REmovEo wITHIN 3o oAys AF7ER nNAL S17E STABILJZA71ON IS ACHIEVED OR AFTER THE TEMPORARY BMPS ARE NO 12" RCP (E) = 404.162' LONGER NEEDED. TRAPPED SEDIMENT SHALL BE REMOVED OR STABILIZED ON SITE. DISTURBED SOIL AREAS RESUL71NG FROM REMOVAL SHALL BE PERMANENTLY STABILIZED. 15. EROSION AND SEDIMENT CONTROL REQUIREMENT - DEWATERING CONSTRUC71ON SITES. DEWATERING SYSTEMS SHALL DISCHARGE INTO A SEDIMENT TRAP OR SEDIMENT POND. 16. EROSION AND SEDIMENT CONTROL REQUIREMENT - CONTROL OF POLLUTANTS OTHER THAN SEDIMENT ON CONSTRUCTION SITES ALL POLLUTANTS OTHER THAN SEDIMENT THAT OCCUR ON SITE DURING CONSIRUCTION SHALL BE HANDLED AND DISPOSED OF IN A MANNER THAT DOES NOT CAUSE CONTAMIN47ION OF STORM WAITER. .07, 42.3111 1Z EROSION AND SEDIMENT CONTROL REQUIREMENT - FIA14NC14L L14BIL17Y PERFORMANCE BONDING, OR 0771ER D(. CURB & APPROPR14TE FIAb4NC/AL INSTRUMENTS, SHALL BE REQUIRED FOR ALL PROJECTS TO ENSURE COMPLIANCE WITH 7HE __�_ �1\ APPROVED EROSION AND SEDIMENT CONTTOL PLAN, [ORD. 3013 § 1, 19951. f MIN, RADIUS QUARRY SPALLS 2-4' MIN DIA 8'-12' MIN. DEPTH PROVIDE FULL WIDTH OF INGRESS/ EGRESS AREA CONTRACTOR SHALL MAINTAIN TEMPORARY CONSTRUCTION ENTRANCE DURING THE CONSTRUCTION PERIOD. STRAW BALES MAY BE USED IN CERTAIN CIRCUMSTANCES (SEE DETAIL E1.1.1), THIS APPLICAITON SHALL BE MAINTAINED AT ALL TIMES DURING CONSTRUCITON PERIOD, CITY INSPECTION REQUIRED ON ALL EROSION CONTRO CITY INSPECTION REQUIRED ON ALL EROSION CONTROL MEASURES BEFORE WORK CAN BEGIN, MEASURES BEFORE WORK CAN BEGIN. IRTER FABPJC FENCE F&M77ON SYSTEMS STABILLZED CONSTRUCTIONENTRANCE -TEAVORAR Y SEDMNT TRAP FOR CA TCH BASEVS NOT TO SCALE STD OTL El. I NOT TO SCALE SID DTL E1.2 NOT TO SCALE STO DTL. E1.3 SEDMIUM INFLOW (IOYR124HR) SURFACE REQUIRED POND TOP ELEV. POND BOTIUM ELEV EMERGENCY OVERFLOW spiLLwAyaEv. ISURFACE AREA PROWDED &TIL17Y CONFLICTNOTE.- CA UTI01 V - -GENERAL NOTES. 1. LOCA77ON OF EXISTING UTILMES AND IMPROVEMENTS SHOWN ARE APPROXIMATE ONLY. IT SHALL BE THE RESPONSIBIL17Y OF THE CONTRACTOR To DETERMINE THE EXACT LOCATION(S) OF ALL THE UTIL177ES AND IMPROVEMENTS TO AVOID DAMAGE AND DISTURBANCE. Z ALL CONSTRUCTION SHALL CONFIRM TO THE CURRENT EDITION OF WSDOT STANDARD SPECIFICA77ONS FOR MUNICIPAL PUBLIC WORKS CONSTRUCTION AND TO CITY OF EDMONDS COMMUNITY DEVELOPMENT CODE AND STANDARD PLANS AND ANY REQUIREMENTS ESTABLISHED AT CITY HEARINGS ON THIS SITE. 3. ALL CONSTRUC77ON IS. SUBJECT TO INSPECTION BY THE CITY OF EDMONDS. THE CONTRACTOR SHALL N07IFY THE CITY OF HIS SCHEDULE IN SUFFICIENT TIME TO PERMIT INSPEC77ON PRIOR TO AND DURING THE WORK. 4. Al I WORK WITHIN THE SITE AND CITY RIGHT-OF-WAY SHALL BE SUBJECT TO THE INSPEC77ON OF THE CITY ENGINEER. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL PERMITS FOR ROAD AND UTILITY CONS7RUC77ON. 6. PROWDE AND MAINTAIN TEMPORARY SEDIMENTATION AND COLLECTION FACILITIES TO INSURE THAT SEDIMENT -LADEN WATER DOES NOT ENTER THE NATURAL DRAINAGE SYSTEM. THESE FACILITIES MUST BE IN OPERATION PRIOR TO CLEARING AND GRADING, AND SAIISFACTORILY MAINTAINED UNTIL CONSTRUCTION IS COMPLETE AND THE POIENTAL FOR SITE EROSION HAS PASSED. 7. ALL STORM SEWER PIPE SHALL BE CONCRETE (CP), NON -REINFORCED, ASTM C-14, CORRUGATED METAL 14 GA GALVANIZED, ASPHALT COATED IREATMENT I OR BETTER, MEETING MSHTO M036- CORRUGATED ALUMINUM, 12 GA., 3"xl' CORR. (OR PVC ASTM D-3034) EXCEPT AS NOTED. 8. ROAD RESTORA71ON SHALL BE PER CITY OF EDMONDS STANDARDS. 314 SACK CDF TRENCH BACKFILL REQUIRED IN HIGHWAY 99 9. ALL ROOF DRAINS SHALL BE CONNECTED TO THE STORM DR41NAGE DETENTION SYSTEM. 10. ALL ROOF DR41N STUDS SHALL BE MARKED WITH A 2"x4" POST SHOWING DEPTH AND MARKED IDRAIN' 11. ALL CATCH BASINS SHALL HAVE LOCKING LIDS OR GRATED. 12. ALL TYPE 11 CATCH BASIN MANHOLES AND ALL INLETS, CATCH BASINS OUTSIDE OF THE PUBLIC RIW SHALL HAVE LOCKING LIDS OR GRATES. 13. STANDARD LADDER STEPS SHALL BE POLYPROPYLENE. 14. ALL STRUCTURAL FILLS SHALL BE COMPACTED TO A MINIMUM DENSITY OF 957. OF MAXIMUM DENSITY BY MODIFIED PROCTOR TEST 15. UTILITY TRENCH BACKFILLS SHALL BE COMPACTED TO 951". RELATIVE COMPACTION UNDER ROADWAYS AND 907. OUTSIDE ROADWAYS. 16. STORMWATER DETEN770NIRETENTION FACILITIES MUST BR FLUSHED AND CLEANED PRIOR TO ACCEPTANCE. 1Z TEMPORARY SEDIMENTATION AND EROSION CONTROLS SHALL BE MAINTAINED FOR THE DURATION OF THE CONSTRUCTION. TYPICAL METHODS SHALL INCLUDE A TEMP. ROCK CONSTRUC77ON ENTRANCE, CHANNELS FOR SURFACE RUNOFF, HAY BALES, SILT FENCE OR OTHER COWEN77ONAL METHODS. 18. ALL DISTURBED AREAS SHALL BE SEEDED WITH PERENN14L GRASSES PROMPTLY UPON COMPLETION OF GRADING. 19. CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTED ALL MANHOLE, INLET AND CATCH BASIN FRAMES AND MTE JUST PRIOR TO PAVING. 20 IN THE EVENT THAT FIELD CONDITIONS DIFFER FROM INFORMA77ON PRESENTED IN THESE PLANS, THE CONTRACTOR SHALL BE RESPONSIBLE TO CONTRACT THE ENGINEER FOR A FIELD CHANGE PRIOR TO CONSTRUC77ON OF THE CONTESTED ITEM. CONSTRUCHON SEQUENCE I. PRIOR TO CONSTRUC77ON ACTWMES, THE CONTRACTOR SHALL SCHEDULE AND ATTEND PRE -CONSTRUCTION CONFERENCE WITH THE CITY OF EDMONDS INSPEC71ON UNIT GWIIVG Q U, 4 A TITIES. AND EROSION CONTROL SPECIALIST CALL TO SCHEDULE - PRE -CON AND ALL 07HER INSPECT!ONS 24 HOURS IN CUT. 1000 Cu. Yds. ADVANCE AT 425-771-0220, ECT. 1326. P 2. FLAG CLEARING LIM17S AND INSTALL SILT FENCE AS SHOWN. FILL: 8,500 Cu. Yds. (GRADING QUAN77TIES WERE CALCULATED USING THE LAND 3. INSTALL ROCK CONS7RUC71ON ENTRANCE. DEVELOPMENT DESKTOP COMPOSITE METHOD. CALCULATIONS DO NOT ACCOUNT FOR SOIL SWELUNG AND SHRINKAGE.) 4. CLEAR AND GRUB ROAD AREAS, AND STOCKPILE AREAS. CONSTRUCT SEDIMENT POND INSTALL TEMPORARY EROSION IVOTE - CONTROL BUP's SUCH AS INTERCEPTOR 7RENCHES, CHECK DAMS, ETC. AND DIRECT RUNOFF TO THE SEDIMENT POND. 1. EXCESS CUT MAY BE SPREAD ON SITE. 5. GR40E AND STABILIZE PARKING AREA WfIH GRAVEL BASE. Z ANY SOIL REMOVED FROM THE SITE MUST BE HAULED TO A CITY COVER EXPOSED SOILS WITH MULCH, HOG FUEL OR APPROVED SITE. HYDROSEED. J. BEFORE CONSTRUC77ON ACCEPTANCE BY THE CrTY, THE APPUCANT 6. CONSTRUCT DETEN77ON VAULT SHALL ESTABLISHED A PERMANENT VEGETA71VE GROUND COVER. Z CONSTRUCT WATER AND STORM UTILITIES. INSTALL GAS, POWER, TELEPHONE AND CABLE UTILITIES, AS REQUIRED. TES C. LEGE0 8. PLACE AND POUR CURBS AND GUTTERS. co 9. PAVE PARKING AREAS WITH AT6 AND PLACE DETENTION m - - ... _ INTERCEPTOR TRENCH W/ SYSTEM INTO FULL OPERATION. --ss- ROCK CHECK DAM 10 HYDROSEED REMAINING EXPOSED SOILS AND STABILIZE PROJECT. SF- SF- SILT FENCE 12. FLUSH STORM DRAINAGE SYSTEM AND REMOVED SEDIMENTA77ON IN ALL CATCH BASINS AND THE VAULT. TEMPORARY CONSTRUCTION 13. STABILIZE ALL DISTURBED AREAS AND REMOVE ALL TE.S.C. ENTRANCE MEASURES. CATCH BASIN INSERT 0 PROTECTION (TYP.) CLEARING LIM17S 0.53 CFS 633 SF EL=412.00 EL=40ZOO EL=41 1.00 (L=6') 700 SF (ELEV, 411) THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, DIMENSION, AND DEPTH OF ALL EXISUNG U77LJTIES WHETHER SHOWN ON IHESE PLANS OR NOT, BY POTHOLING THE UTIL177ES AND SURVEY7NG THE HORIZONTAL AND VERTICAL LOCA710M PRIOR TO CONSTRUCTION. THIS AND THEN SHALL INCLUDE CALLING UTILITY LOCATE @ 1-800-424-5555 POTHOLING ALL OF THE EXISTING UTIL171ES AT LOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY VERIFY WHETHER OR NOT CONFLICTS EXIST. LOCA77ONS OF SAID UTIU77ES AS SHOWN ON THESE PLANS ARE BASED UPON THE UNVERIFIED PUBLIC INFORMATION AND ARE SUBJECT TO VARIATION. IF CONFLICTS SHOULD OCCUR, THE CONTRACTOR SHALL CONSULT WffH INSIGHT ENGINEERING COMPANY TO RESOLVE ALL PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION. FOR: Crff OF EDMONDS APPROVED FOR CONSTRUCHON ,PUBLIC WORKS DIRECTOR - DATE CALL TWO (2) B USEVESS DA YS BEFORE YOUDIG 1-800-424-5555 2 REVISIONS PER ARCHITECT SJR 105-13-2008 1 REVISIONS PER CITY OF EDMONDS SJR 03-14-2008 REV, NO. DESCRIPTION INITMLS DATE I EXPIRES 11/30/2008 1 MULCH &IOR STRAW MATTING PLASTIC COVER FLOW ARROW (EX.) ..... ..... insts 3630 COLBY AVE., EVERETT, WA 98201 (425) 303-9363 (425) 303-9362 FAX MF0@1NS1GffMNGHiEERWG.NET SITE ADDRESS, 234th ST. SW & HWY. 99 EDMONDS, KA RESU TAX ACCOUNT NO.'S. 00576700002002 JUN 23 201 S W 114, NE 114, SEC. 3 1, T. 2 7 X, R. 4 R, W. M. A -2 @ EDMONDS COMMERCIAL DWG FILENAME DESIGNED BY: DATE. SCALE. JOB NO.: 070443-COMM.DWG I MNF 8-30-2007 1`_-30' 1 07-0443 SHEET TESC & GRAD17VG PLAN C3 Of 5 CBh9 TYPE248"O RIM=428.00.* IE=422.36 FOUND RER4R WITH NO CAP-\ 1.0' E4ST AND 1.2' NORTH OF CORNER. FOUND REBAR AND CAP,- LS137527 ON PROPERTY LINE, 2.0' EAST OF CORNER. 28LF 12* SD @O-5Z REAR SIDEWALK INV. 3" ADS = 427.2'- (TO BE CONNECTED TO THE F007ING DRAIN) 2" MIN AC PAVEMENT i Am r iol cn L__t- 2'�-518- CSTC 4'�- 1- 114" CSBC APPROVED SUBGRADE REFA PA VEAENT SECTION NIS ... ... .... .. . . CB#8 71YPE 248"0 RIM=429.00.* IE=421.62 CONSTRUCT CB OVER E)0S7ING PIPE CONTRACTOR TO VERIFY LOCATIONS AND DEPTH. N077FY ENGINEER FOR DISCREPANCIES 53LF 120 SD @12 CB#7 TYPE 248"0 SIA: 31+45.36 RIM=431.00.+ IE=414.90 00.5%-1 INING NALL-:-� 10' SEWER EASEMENT I as FOUND REW AND Ap 'EMERALD LSJO581' CON PROPERTY LINE AT 30' FROM CENTERLINE OF 2J47H STREET SW. 1: 12 MAX. SLO ACP RAMP- STA:946.�O, 13.651 LK" FOUND CONCRETE ;,olu Cal MA TCH TO MONUMENT WITH 1.75" EX. CURB BRASS DISC AND -JpP M PUNCH, 0.3' DEEP IN POSED - C. D STA: 0+ 18 I PRO I MONUMENT CASE FOG L E 45Z MATC T. N 8.759'2 ?LINE N 875921" E PAINTED CENTEI i = - W 1 J�/ ofl W J�4.29' 234TH 51 SS SIGN S L SD wM SSMH kil 445.80' 8" PVC N, E, & W Q) CTR CHANNEL = 437.90' �CB RIM 434.48' I:p FOUND CONCRETE MONUMENT WITH 12 " DI (E) = 431.58' CB RIM 413.67' 1.75" BRASS DISC AND PUNCH, 12 " DI (W) = 431.48' 0.5' DEEP IN MONUMENT CASE ELEVATION = 461.63' VARIES PER CONCRETE CURB AND GUTTER OR 16" VER77CAL CODE CURB (To MATCH EXISTING CURBING) SHALL a -TEND TO END OF RADIUS. EXTRUDED CURB RADIUS VARIES SHALL START AT END OF RADIUS TYPE 2 CURB RAMP TRANSITION SLOPE LL TYPE 2 CURB RAMP 5' LONG RAMP MIN. BE 1: 12 (TYP) SHA �Z5' LONG RAMP MIN. (SEE DEFAIL E-2.15) .,Z (SEE DETAIL E-2.15) 0�0 0 0 000.0 000 0 SIDEWALK 000 00 0 0 A( 00.0 A,�J \CONCRETE CURB AND GUTTER \PLACE 1' WIDE TACTILE PLACE FULL DEPTH EXPANSION JOINT BETWEEN I* BEHIND START OF RAMP CIG AND HIGH TRAFFIC LOAD GUTTER, IF WING AND CIG ARE NOT POURED AS ONE UNIT CURSIGUTTER AND WING FOR HIGH TRAFFIC LOAD GUTTER MAY BE POURED AS ONE UNIT FULL DEPTH EXPANSION JOINTS SHALL BE PLACED IF WIDTH ACP ACP OF OPENING EXCEEDS 15' 24" CONCRETE SHALL BE CLASS J- JOOOPS1 SECTION A -A NOTE. CITY ENGINEER SHALL DETERMINE ---------- APPLICABLE COMMERCIAL TYPE ENTRANCE BASED ON LOCATION & OTHER SITE CONDITIONS. 0 0 0 0 00 00 0 CURB AND GUTTER SHALL BE POURED 0000000G SEPARATELY FROM THE SIDEWALK. CITY INSPECTION REQUIRED ON FORM WORK PRIOR TO POUR.- -.a- ASPHALT SURFACE MUTI-FAMLY1COAOffiRCIAL HIGH TFAMCLOAD DRIVEWAYACCESS 4) (WIMASPHALTDRIVEWAYAPPROA NOT TO SCALE STD OIL. E2.27 n 0 .�nn 00 DETECTABLE WARNING PATTERN AREA A SHALL BE YELLOW. AAMP I t� q r MIN. UAX. 6', PLAN A 1 518' 2 3Ar c B W 1 112- C 71le 314- t D 0 71e .1 7/le, EUVA77ON FZM AW rdPIAM DETAIL B CUM AW CVM -- SW 1143, INE 114, SEC. 31, T 27 X, R. 4 E, W.M. SNOHOM1SH COUNTY, WASHWGTON , C) 5 ""�11-81LLBQARD co V zo/ n Ar\ ' '4 CV CB RIM 404.32' 12 RCP (E) 402.02 Ro =41 1.0 c-b" N .00 30 12* SD 0 V-50% I SCALE: I"= 30' AR =409.50 KEEN IBM mommumm, =404.65 I FROM Elm olimmum 30 15 0 30 60 thirn r - WALL DRAIN INTO C 7 'LF 1 SO 0.5oz 0 STA: 2+83.60 )0 '00 5 CT Co PIPE 407. 2' (N) = 404.72' = 404.162' 420 410 ACCESSROAD PROFILE SCALE. 1�--30' HORIZ 17=3' VERT CITY INSPECTION REQUIRED ON FORM WORK PRIOR TO POUR ACCESSIBLE RAMP SMU BE POURED SEPAR4TELY FROM CURB AND GUTTER. 6.0' 3.5'- 6. Ol MIN MIN C.) Rw 112' '6 6" mmo L B-1 0 0 1 1/4 0 0 oul 0 0 0 0 NOMINAL DIMENSIONS I SWFE .12 AM 3r 7RAC77ON GRID PATTERN to TAC17LE WARNING TEXTURING r Fr rrrrFF r DETAIL A (TYPICAL) rrrrrrrrrrrr wil-Al INSTALL 112- EXIANSION VOINT MATERAL (TYPICAL) L- Emm L L SMAW L L L SAW CUT AS REQUIRED I' WIDE TAC71LE WARNING STRIP (TYPICAL) SEE DETAIL A CTARLE WARNING PATTERNS VCATED DOMES) DETAIL 8 NOTE. Sw CUT As rxoum 1. AT LOC477ONS WHERE NEW RAMPS ABUT EXISTING CURB, GUTTERS, PLANTER STRIPS, AND SIDEWALKS, CONSTRUCT NEW RAMPS TO MATCH ADJACENT SURFACES. 2. ALL CONCRETE SURFACES SHALL HAVE A LIGHT BROOM RNISH. 3 CONCRETE SHALL BE SPR4YED Wr[H A CLEAR CURING COMPOUND OR SHALL BE COVERED AND KEPT MOIST FOR 72 HOURS 4. DETECTABLE WARNING. pA77ERNs (IRuNcATFD DOMES) SMLL BE REQUIRED ON ALL PUBLIC STREETS WMI A CURB RETURN AND PRIVATE SIREErS SERVING FIVE OR MORE L07S 7RAC71ON GRID (OW40NDS) TO BE USED AS INDIC47ED. 5. FOR NON-INTERSEC71ON CURB RAMPS ON PRIVATE PROPERTY THE STANDARD DIAMOND PATTERN AMY BE USED AS INDICATED IN DETAIL A IN E 2.22 CURB RAW TYPE 3 NOT TO SCALE STD DTL E2.16 40( log-) : L : V :2 Lg+-�Ck- 0) CL i ckc EXISTING RADE 0 CIL OF RIW R cl cs Q1 zc (f) PROPOSED FLOW LINE (6 w v) Ql) �6 0� '4 (6 4JO 420 410 400 9+00 10+00 11+00 234th STSWFROATAGEPROFILE SCALE. l--io' HORIZ 1�=3' VERT 30, 'tit 18, 4,50' 0*5' EX. PAVED LANE EX. PAVED LANE SAWCUT - HEAT AND TACK SIDEWALK CURB EDGES WITH SE4LER SS-1 (TYP-) 2Z 40 CONCRETEJ 3- COMPACTED DEPTH CLASS B ASPHALT (2 LIFTS REQUIRED) 4" COMPACTED DEPTHA 4- COMPACTED DEPTH ATB (2 LIFTS REQUIRED) GRAVEL BORROW (TYP.) 3" CRUSHED SURFACING TOP COURSE 12' COMPACTED SUBGR4DE 95% MOO 234TH STREET SWFRONTAGE SECTION om 1. CURB AND GU77ER SHALL NOTBE PLACED OVER THE TOP OF WATER VALVES. 2. THE FOG LINE SHALL BE REPANTED.AND MATCH EXISTING. w 5: 1. C14 420 410 PVf STA = 1+76.60 P/l. L PVf ELEV = 414.96 'cS, 04 c� W) 1+ A.D. = -8.99 + C6 C5 K = 11.12 100' vc cs 0 + CL cf) ,,-EXISIING GRADE 0 CL co C14 CN + /Z PW STA 2+51.60 Lj Q j�s PV( ELB 407.46 A.D. 8.99 K 5.56 2 5(' VC SED GRADE @ CL- -1.007. c� C,4 A cli co co + C14 LL + LN E5 Z 0) CN4 -00 co ll� C14 cy) N Lci ll� C'i Q) Q) TOP OF WALL EL=430.70 EXISTING GRADE BOTTOM OF WALL EL=41 .30 CB#7 TYPE 2-48"0 STA- 31+45.36 RIM=431.00-+ IE=414.90 cm STA-jO+0O RIM=408.00 IE=405.65 Lo 31+00 C& #6 - #7 PROFILE SCALE. l--io' HORIZ VERT 4JO 420 410 30+00 DRMENSLEPROFILE SCALE.- l--io' HORIZ l--3' VERT EXPIRES 11/30/2008 UTILHYCONFLICTNOTE.- CA OTION. - 41 THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, DIMENSION, AND DEPTH OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE PLANS OR NOT, BY POTHOLING THE UTIL177ES AND SURVEYING THE HORIZONTAL AND VERTICAL LOCA71ON PRIOR TO CONSTRUCTION. THIS AND THEN SHALL INCLUDE CALLING U77LITY LOCATE 0 1-800-424-5555 POTHOLING ALL OF THE EXIS77NG U77LITIES AT LOCA77ONS OF NEW UTILITY CROSSINGS TO PHYSICALLY VERIFY WHETHER OR NOT CONFLICTS EXIST LOCA77ONS OF SAID U71LITIES AS SHOWN ON THESE PLANS ARE BASED UPON THE UNVERIFIED PUBLIC INFORMATION AND ARE SUBJECT TO VARIATION. IF CONFLICTS SHOULD OCCUR, THE CONTRACTOR SHALL CONSULT WITH INSIGHT ENGINEERING COMPANY TO RESOLVE ALL PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION. FOR: , PUBLIC WORKS DDZECTOR DATE 2 REVISIONS PER ARCHITECT SUR 105-13-20 1 REVISIONS PER CITY OF EDMONDS SUR 03-14-2008 REV. NO. DESCRIPTION IN177ALS DATE ins I 3630 COLBY AVE., EVERETT, WA 98201 (425) 303-9363 (425) 303-9362 FAX lNF0@lNSlGHTENGH4EEMG.NET SITE ADDRESS. 2J4th ST. SW & HWY. 99 EDMONDS, WA RESUB TAX ACCOUN . T NO.'S. 00576700002002 jUN 23 2008 ON SW 114, NE 114, SEC. 31, T. 27 N., R. 4 E., W.M. A-2 @ EDMONDS COMMERCIAL BWG FILENAME DESIGNED BY: DATE. SCALE. JOB NO.: 97044J-COMM.0 MNF 8-J 1'"�=Jol 07-0443 SHEET C4 ROAD& DRA17VAGE PLAN. of 5 SW 114, AE 114, SEC. 319 T 27 Xq R. 4 E, W.M. SNOHOMISH COUNTY, WASHINGTON C' ITI=COMFLETNOTE: CA MON. - ME CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, DIMENSION, AND DEPTH OF ALL EXISTING U77LITIES WHETHER SHOWN ON THESE PLANS OR NOT, BY POTHOLING THE U77LMES AND SURVEYING THE HORIZONTAL AND VER77CAL LOCATION PRIOR TO CONSTRUCTION. THIS AND THEN SHALL INCLUDE CALLING U17LITY LOCATE @ 1-800-424-5555 POTHOLING ALL OF THE EXISTING URLITIES AT LOCA77ONS OF NEW UTILITY CROSSINGS TO PHYSICALLY VERIFY WHErHER OR NOT CONFLICTS EXIST. LOCATIONS OF SAID UTILITIES AS SHOWN ON THESE PLANS ARE BASED UPON 7HE UNVERIFIED PUBLIC INFORMATION AND ARE SUBJECT TO VARIATION. IF CONFLICTS SHOULD OCCUR, THE CONTRACTOR SHALL CONSULT WITH INSIGHT ENGINEERING COMPANY TO RESOLVE ALL PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION. 10' MIN. z24' 0 SOLID LOCKING LID W14- TOP ELEV=412.0 FRAME & LEVELING BRICKS (TYP.) 5'xlO' GRATED ACCESS DOOR OR. UNLESS OTHERWISE NOTED 0.50' MIN. COVER PANEL USE P.I.P.E., INC. GRATE 5496 OR EQUIVALENT 4 .4 4 —0 0 ) 0 D ( * —000 0 OVERFLOW EL=409.56 00\ 17 _\�, 0 - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 100 YR. EL=409.56 — 0 0 0 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 10 YR. EL=409.37 - - - - - - - - - - - 0 0 0 - - - - - - - - - - - - - - - - - - - - - - - - - - - 2 YR. EL=409.27 - - - - - - - - - - - o —0 - 0 Nz -0 0 0 c D64D STORAGE EL=406.00 -0 0 N __o LEVEL 04 EL= 403.00 .4 4 4 YA LILT SECTION B-B N.T.S. W4 24- 0 SOLID LOCKING LID W14- FRAME & LEVELING BRICKS (TYP) UNLESS OTHERWISE NOTED HANDLE WITH LOCK PIN ADJUSTABLE LOCK HOOK W1 LOCK SCREW Q 0 0 0 LEVEL LINE 0 0 09 0 0 FRONT SIDE LIFT HANDLE SHALL BE ATTACHED PER MANUFACTURER'S RECOMMENDATIONS. ALTERNATES ARE ACCEPTABLE PROVIDED MATERIAL SPECIFICATIONS ARE MET AND FLANGE BOLT PATTERN MATCHES CLEWOUTISHEARGAM ALM" OPENNG OF GA TE SIX EVENLY SPACED HOLES ON 10 318- BOLT CIRCLE FOR BOLTING TO FLANGE CONNECTION. 0.50' MIN. COVER 0 0 0 0 0 0 0 0 0 0 0 5'XIO' GRATED ACCESS DOOR TOP ELEV=412.0 10' MIN. 0,0, 0 0 0 0 0 0 24' 0 > 0 0 c 0 0 C C7---- 4 'IE (/N)=40ZOO 0 0 _/o( MIRA = 0 <_ OR EQUIVALENT c 0<)- Ch i 7E )o 0- 0- 0 0 0 c 0 0 c D.S. EL=406.00 0 6" PERFORATED -14 (D 0 WALL DRAIN 0 LEVEL 0 c EL=403.00 --r- 8. 1 VAULTSECTIONA-A N.T.S. - 9"xl"xl2ga GALV. STRAPS TACK 'D TO WIRE MESH SECURE STRAINER F.T.O.P. TEE W1 GALV. I 6xl- EEr METAL SCREWS, 2 PER STRAP. - ------ — 112" x 112" x 16go. CALV. WIRE MESH SOLID 12ga GALV. BOTTOM PLATE TACK WELDED TO BOTTOM OF MESH. NOTE. STRAINER MATERIAL TO BE SAME AS CONTROL STRUCTURE r3 _'� S TRNMR DETA IL ',,,,j4 EL=411.50 EL=410.50 12- 1E (IN)=404.50 I I — EL=411.50 \D c U ( EL=410.50 000, oc> 00 0 0 0 0 C 0 0 POLYPROPYLENE STEPS C (TYP.) - ALL ACCESSES 0 0 0 0 MIRA DRAIN 'o OR EQUIVALENT '00 c 12" OUTLET ]E=406.00 6" PERFORATED WALL DR41N 4' MIN. 48" SQUARE 04ST IN PLACE SUMP rnz% " T YTTITV r N.T.S. ___�7 - - - - - - - - - - ORIFICE 12 4.63- OR 4-518- EL=409.37 (ORIFICE TO SHARP -EDGED, SHOP -DRILLED) CLEANOUT GATE cl, CN POLYPROPYLENE SAFETY STEPS AND LADDER FROP LIFT HANDLE POLYPROPYLENE SAFETY _—STEPS AND LADDER OVERFLOW EL = 409.56 RISER PIPE -- PIPE SUPPORT 31014- STEEL 12" SD OUTLET PIPE EL. = 406.00 ORIFICE il: Db4.=0.59" OR 9116" (ORIFICE TO BE SHARP -EDGED, ,______SHOP-DRlLLE0) EL.=404.00 STRAINER FLOW RESTRICTOR 4 N.TS. TYPE 1 48" MH SUMP CL N 1w L T If ALA 4 ".4. 'A. X, %A it W -fE .41 f WE ,-,o al. wit" 41 mm. mm-'T tmv IR, MY Y. DETAI MLITYCONFLICTNOEE: CA MOA I - THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, DIMENSION, AND DEPTH OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE PLANS OR NOT, BY POTHOLING THE UTILITIES AND SURVEYING THE HORIZONTAL AND VER77CAL LOCATION PRIOR TO CONSTRUCTION. THIS AND THEN SHALL INCLUDE CALLING UTIL17Y LOCATE @ 1-800-424-5555 P07HOLING ALL OF THE EXISTING U77LITIES AT LOCATIONS OF NEW U17LJTY CROSSINGS TO PHYSICALLY VERIFY WHETHER OR NOT CONFLICTS EXIST LOCATIONS OF SAID U71LIlIES AS SHOWN ON THESE PLANS ARE BASED UPON 714E LIWERIFIED PUBLIC INFORMATION AND ARE SUBJECT TO VARIATION. F CONFLICTS SHOULD OCCUR, THE CONTRACTOR SHALL CONSULT WITH INSIGHT ENGINEERING COMPANY TO RESOLVE ALL PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION. CUL 7WO (2) B USEVESS DA YS 3EFORE YOUDIG 1-800-424-5555 SW 114, AE 114, SEC. 31, T. 27 Np R. 4 R, W.M. SNOHOAHSH COUNTY, WASHINGTON t 41 SO, RD FOUND REBAR WITH NO CAP 1.0' EAST AND 1.2' NORTH 8759,21 E 260.61� Or CORNER. IN SO - FOUND REBAR AND CAP, LS#37527 ON PROPERTY LINE, 2.0 E4ST OF CORNER. //DCTA r REAR SIDEWALK - INV. 3" ADS = 427.2'— H. RETAINING NAtL i o' SEWER EASEMENT as PROPOSED 44*1' SIDE SEWER 0 2% MIN. (lyp.) STA: 1+78.73, 6.13 R RVSTALL. 1-8"D.L45'BEND(MJ) wATIRUSTBLOCKING1 7\ 3,3310 S.F. rh 4) CB RIM 4 04.32' 12" RCP (E) = 40 0 L4— 4� vicvvff Y MAP SCALE. 1�=2000' C) )B Lake allinger A. E Al Q UIPMEA T A 10 PR 0 CED URE METHOD OF SURVEY: If cb* SURVEY PERFORMED BY FIELD TRAVERSE INSTRUMENTATION. LEICA TCR4 1105 ROB077C ELECTRONIC TOTAL STATION If FF=415.PO RETAIL B I A/ PRECISION. mo i;� o Wv MEETS OR EXCEEDS STATE STANDARDS WAC 332-130-090 9,OODS.F.// '4 SCAILE: 1 30' BASIS OF BEARING - THE MONUMENTED CENTERLINE OF 234TH STREEr NE, AS THE BEARING OF N 875921" E LEM ROM ommimmm 30 15 0 30 60 AND PUNCH, 0.5' DEEP IN MONUMENT CASE, RM IN CENTERLINE OF 234TIt 320' WEST OF SITE. CONCRETE MONUMENT W17H 1.75' BRASS DISC ELEVATION 461.63' WATER LEGEND ql� METERS DA EXIS71NG MONUMENT (AS SHOWN) N4VD 88 1-1, _'N PROPOSED MONUMENT EXUVEER SURVEYOR -fir �E=(IN)400.43 INSIGHT ENGINEERING COMPANY PACIRC coAsT SURVEYS, INC. I I ii/LF 8 IE=(OUT)400.J3 SEC77ON CORNER 3630 COLBY AVENUE P.O. BOX 3286 I I I L.NCLOSUR)E CONSTRUCT SSMH FOR EXIST + EVERETT, WA 98201 EVERETT, WA 98213 8"DI PIPECONTRACTOR TO VERIFY LOC47ION 0 FOUND REBARICAP OR I.P. (IRON PIPE) CONTACT. BRIAN R. KALAB (425) 508-4951 myu ur-rin. ivulirl tivbl1vrzK rurc TOR TO BE REMOVED (-tzz)j oui—aam? rAA (IZDJ JW—,70// n STA: 1+39.48,3.77R D ClES_ FAX (425) JOJ-9362 INSTALL: P.O.B. POINT OF BEGINNING 1-8"DJ. 45' BEND (MJ) wlFBRUSTBLOCKlNG W STA; 2+83.60 EOP EDGE OF PAVEMENT ARCHITECT OWNER THOMAS THOMPSON M CLAY alTERPRISES LLC. 4 29619 15th AVENUE NE 2002 196th ST SW IQ CB STORM DRAIN CATCH BASIN STANWOOD, WA 98292 LYNNWOOD, WA 98036 SDMH STORM DRAIN MANHOLE (J60) 629-J985 FAX (360) 629-54J5 QSSMH SANITARY SEWER MANHOLE L If 0 CO SANITARY SEWER CLEAN OUT APPLICAAT 4- dPP POWER POLE A-Z 0 EDMONDS LLC. 2J72J 112th PL W If FF=�14.00 E— UTIL17Y POLE ANCHOR SHORELINE, WA 98020 4 (206) 542-4411 m wM WATER METER FAX (206) 542-9654 �U RETAIL/ A .t.d If >< wv WATER VALVE B RIM 407.52' LEGAL DESCRIPTION Iz 4,60071S.Fe STA:2+4a3l,9.40W FMB MAILBOX 12" RCP (E) 404 62' If JIVSTALL. PARCEL A 1-5114"EH.ASSY. Vi7TI18'�x6"FLTEE t� FH FIRE HYDRANT (2 NOZZLE) THE SOUTH 220 FEET OF THE PART OF TRACT 20 LYING WESTERLY OF 14"STORZ.FM. TYPE I NGFA SIGN STATE ROAD THE SOUTHERLY POINT THEREOF BEING THE INTERSECTION OF THE WESTERLY LINE OF S41D ROAD AND THE WEST UNE OF S410 J. I-espooL ELOCATE EX. 2-8" GATE VALVES (F!Lx&M NO PARKING SIGN TRACT 20, SKELTON'S LAKE MCALEER 5 ACRE TRACTS, ACCORDING TO POWER wIIMUSTBLOCKING -------- THE PLAT THEREOF RECORDED IN VOLUME 6 OF PLATS, PAGE 21, FOUND RERAR AND CAP R.O.W.- RIGHT-OF-WAY 'EMERALD LS30581' ON Q;8/ L RECORDS OF SNOHOMISH COUNTY, WASHINGTON. ROPERTY LINE AT JO' CENTERLINE P R -:.o FROM CENTERLINE OF STA: 18+55.07, 42.Jl EXISTING DffCH PARCEL B 234TH STREET SW. z MATCH TO EX. CURB & 1: 12 MAX, SLO SIDEWALK ACP RAMP, 4 — — — — — — — — BUILDING SETBACK LINE (BSBL) THE SOUTH JJ8.16 FEET OF THAT PORTION OF TRACT 21, SKELTON'S LAKE MCALEER 5 ACRE TRACTS, ACCORDING TO THE PLAT THEREOF 9T 6.50, 1J 651 PROPERTY UNE RECORDED IN VOLUME 6 OF PLATS, PAGE 21, RECORDS OF FOUND CONCRETE A �9_+ 4 cz, MONUMENT WITH 1. 75 MATCH TO SNOHOMISH COUNTY, WASHINGTON, LYING EAST OF THE WEST 183.00 pp EX. CURB I �Aln� 110 BRASS DISC AND _0� X—X— EXIST7NG FENCE LINE FEET OF SAID TRACT. PUNCH, 0.3' DEEP IN 7 7 mm (2) Wv 2zl-z--41111- PROPOSED 0 W STA: 0+18 =!�Z�EDGE OF EXIS77NG PAVEMENT MONUMENT CASE t ALL SITUATED IN THE COUNTY OF SNOHOMISH, STATE OF WASHINGTON. FOG LINE 7 XXX - - - - - - - - - - - 1XISTING CONTOURS N 87-59'21 E ENTERUNE MATCH EXIST. N _�75 ;2�� �_±5 -34 IPAINTED W I w j!�4.29 - ------- Fxx_x� PROPOSED CONTOURS TER INE OF ROW w i —, YV ?34TH EETSW S PRE-EXISTING DR41NAGE PA77ERN OLYWIC VIEW WATER AND SEWER DISTRICT SS S'� I SIGN SSMH RIM 411.54' APPROVED FOR WATER AAD SEWER CONSTRUCTION SD P Wm 7 t 8- PVC N,'S,.,� PROPOSED STORM SSMH = �445.80 CTR C NNEL 401.0�1 PROPOSED SEWER 8 " PVC N, E, & W Q3 CTR CHANNEL = 4J7,90' PROPOSED WATER CB RIM 4J4.48' V'v FOUND CONCRETE MONUMENT WITH 12 DI (E) = 431.58' CB RIM 413.67' DISTRICT ENGINEER OR ASSIGNEE DATE 1.75" BRASS DISC AND PUNCH, 12" DI (W) = 431.48' 0.5' DEEP IN MONUMENT CASE. ELEVATION = 461.6J' '0MYECTTOMST[NG 8" Cl WATER AlAW - 8 7x8 " DI TEE (MfxFL) - 8 " GA TE VALVES (,FLxM -8"DlNZPPLECUTT0FlT - 8 " D. L SLEE VES SANHAR Y SEWER NOTES: 1. CONTRACTOR SHALL N07IFY OWNERS OF ALL AFFECTED UNDERGROUND UTILITIES FOR FIELD LOCA71ONS THEIR FACILITIES. 2. SIDE SEWERS SHALL BE PLACED ON UNDISTURBED SOIL. NA71VE MATERML CAN BE USED FOR BACKFILL PROVIDED SHARP ROCKS ARE KEPT OFF THE PIPE DURING RACKFILL PLACEMENT. J. SIDE SEWERS SHALL BE INSTALLED ACCORDING TO CITY OF EDMONDS STANDARDS FOR SUCH INSTALLATION. 4. SIDE SEWER STUBS ON EACH LOT SHALL BE MARKED WITH A 2"x4" LOCA77ON AT THE END WITH POR77ON ABOVE GROUND PAINTED WHITE WITH BLACK LETTERS LABELED "SEWER" WITH DEPTH. TV. AND PRESS TEST. 5. ALL 4" DL4. CLEANOUTS TO BE RAISED TO GRADE WITH CAST IRON FRAME AND GRATE (LOCKING TYPE). MOTES: UPGRADE PUBLIC FH STEAMER PORTS TO 114 TURN (STORZ) UNIVERSAL FITTINGS AS REQUIRED. 3630 COLBY AVE., EVERETT, WA 98201 (425) 303-9363 (425) 303-9362 FAX R%TF0@lNSlGffMNGWEEPJNG.NET SITE ADDRESS. 234th ST. SW & HWY. 99 2 REVISIONS PER ARCH17ECT SUR 05-13-2008 EDMONDS, WA 1 REWSIONS PER CITY OF EDMONDS SJR 03-14-2008 RESUB REV. NO. DESCRIP77ON INITIALS DATE TAX ACCOUNT NO.'S.- 00576700002002 JUN 23 2008 BLWGEff OF 6MW'a 0 WA SW 114, NE 114, SEC. 3 1, T. 27 X, R. 4 E., W.M. A-2 @ EDMONDS COM4ERCIAL DWG FILENAME DESIGNED BY. DATE,* I SCALE' JOB NO.: %'AA 03649 A 070443-COMM.D MNF B-30-2007 l--30' 07-0443 0 S Tr, '101VAL SHEEF swi EXPIRES 11/30/2008 WATER & SEWER PLAN Of 1