Loading...
23405 78TH AVE W.PDF111111111111 6677 23405 78TH AVE W kekl J CWy of Edmonds Permit No,:' RIGHT-OF-WAYCONSTRUCTION PERMIT Issue Date: 121,110, A. Address or V icinity of Construction: -7 uo C)q c - \ noo . 44- 107 01 a- I Lo "t C. Contractor: MailingAddress: State Licen s e #::?I L.,_1 H 0_.:� / c) 1 111 A D. Building Permit # (if applicable): Contact: I a S/d IdL 'T'>OL"Cl U S, �&d A Phon6:Q?0(o-U/q-L Insurance: Bond: ­ Side Sewer Permit # (if applicable): E. Commercial Subdivision CityProject E] EUC (PUD, GTE, PSE, CHAMBERS, OVWD) Multi -Family Single Family Other INSPECTOR- F. PAVEMENT: E]YES NO .1-G., SIZE OF CUT x H. Chargi� $ CONCRETE CUT: []YES NO APPLICANTTO READ AND SIGN IDEMNITY. Applica . nt understands by hislher signature to.this application helshe holds'the City of-Edmonds1harmlessftom inj . uri . es, -damages or,claims of anj� kind or description whatsoever, A eseen or unforeseen, that may be made against the -City of Ed ' monds or any of.. its departments or emplo�ees,lincludink but not limited to the defense of any legal proceedings. including defense costs and attorneyfies by reason ofgranting thi§permit. THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERJALS,,FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL INSPECTION AND ACCEPTANCE OF THE WORK ESTIMATED -,RESTORATION FEES WILL BE HELD UNTIL THE FINAL STREET PATCH IS COMPLETED BY CITY FORCES, AT WHICHTIMEA DEBIT6,kibRe6I.T'W1LL BEPROCESSED FOR ISSUANCE TO THEAPPLICANT. * Traffic control and public safety shall be in'accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by (WAC) 296-155-305 and must have certification verifying- completion -of the required training in their possession. * Restoration is to be In accordance with City codes. All street -cut trench work shall be patched with asphalt or City - approved material prior to the end of the workday — NO EXCEPTIONS. # Three sets of construction drawings of proposed work are required with the permit application. I HA VE READ THE ABO VE STA TEMENTS AND UNDERSTAND THE PERMIT REQUIREMENTS! AND A CKNO WLEDGE THA T I MUST MAKE THE PINK COPY OF THE PERMIT A VAILABLE ON SITE A T ALL TIMES FOR INSPECTIONS Signature: Q-1c Date: I) --r9b - 0 / (Contractor or Agent) CALL DIAL -A -DIG (1-800-424-5555) PRIOR TO BEGINNING WORK FOR CITY USE ONLY oabfft W Approved by Right-of-wayfee:_ �:�7-6'1 me Authorized. 'Void After 11 IS 40?- Disruption Fee/Fund 111: Special Conditions:_ M 0101ftl d 5-'-fa?QM Restoration Fee:. at,,L 1A1ATkR_ -51 W-S, Total Fee:;* WATIIEU a3ffl �,D 0__�IoPNTS )�,P_vjz RecelptNo:' by-� .:-,.kg-!n0jZg D15T-V@35Qssued lj�Ngsc ig-eg, :0�' 'I'l led-' 6?_ I A. �i A10h &.0, A-2 VS, Cwin r- t t2fl- t )r--r-7 /r-n I C-TICLA If\ A-T'!o nC- UPON COMPLETION OF PERMITTED WORK., AN ENGINEERING FINAL INSPECTION IS REQUIRED PER CHAPTER 18.00 OFTHE EDMONDS COMMUNITYPEVELOPME CODE. FINAL APPROVAL OF PERMITTED, WORK, INSPECTOrR'S SIG7VA TURE DATE., for inspection requirements see Engineering Information Haw NO NNIORK SHAIA, BEGIN PRIOR TO PERNIIT ISSUANCE STANDARD NCC GAS CONSTRUCTION NOTES: 1. FIELD LOCATE ALL UNDERGROUND UTILITIES. CALL NONE- CALLN 48 HOURS PRIOR TO CONSTRUCTION, 1-800-424-5555. 234 ST SW 2. ALL CONSTRUCTION IS TO CONFORM TO PSE GAS OPERATING STANDARDS AND GAS STANDARDS PROCEDURES MANUAL. 60' 3. INSTALL MAIN VALVES OUT OF TRAFFIC WHERE POSSIBLE. R/W 4. ANY CHANGE IN ROUTE9 TIE-IN METHOD OR ADDITIONAL MAIN FOOTAGE MUST BE APPROVED BY PSE REPRESENTATIVE. 5. COMPLETE NPIPE CONDITION REPORT* ON ALL EXPOSED EXISTING PSE FACILITIES. CHECK BOX ON REPORT FOR WIRE BOX (TEST LEAD) INSTALLATION. 6. INSTALL ONE POUND ANODE FOR EVERY 1000' OF LOCATING WIRE. INSTALL 60' ANODE AND TEST LEAD WIRES PER PSE GAS OPERATING STANDARDS 14.2 AND R I/W 14-5. 7. MAINTAIN CATHODIC PROTECTION FOR STEEL MAINS BY THE USE OF CONTINUITY BONDS OR OTHER MEANS DETERMINED BY THE PSE CORROSION ENGINEER PER PSE GAS OPERATING STANDARDS 10.3 E.O.M I VE, 589'N CIL OR. 8. INSTALL ANODES AND TEST LEAD WIRES AS REQUIRED PER PSE GAS WE - ------ S C/L STANDARDS PROCEDURES P0201 AND P0303 AND PSE GAS OPERATING STANDARD 10-2. TEST LEAD WIRES ARE REQUIRED ON ALL TRANSITION FITTINGS. 9. REFER TO PSE GAS OPERATING STANDARD 6.8 FOR MAIN AND SERVICE COVER PROPOSED 2" MPE-IP MAIN REQUIREMENTS. __�L5/8" 515'N C4 11 'E CIL 10. MAINS AND SERVICES SHALL BE TESTED AND PURGED PER PSE GAS 1982 OPERATING STANDARDS 6.14 AND 6.17. < 11. EROSION AND SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 2" SHORT STOPPER Do 0.10- 0 r-_ 1 C-4 TECHNIQUES FOR TEMPORARY EROSION AND SEDIMENT CONTROL AND ANY ADDITIONAL T/L WIRE & BOX LOCAL JURISDICTION REQUIREMENTS. 518'N, WE C/L 2" TRANSITION FITTING 519'N. WE C/L VICINITY MAP NOT TO SCALE 23:6 � ST , SW - —I- — - Owner/ Developer Contact Info BRIAN KING 23405 78 AVE W EDMONDS, WA 98026 425-778-5512 FITMR (Check Box if Complete) • WORK AREA LEFT IN CLEANISAFE CONDITION. r_1 • COMPLETE ALL PIPE TABLES AND GAS PRESSURE STAMP R • FIELD CHANGES RED —LINED ON AS—BUILTS. El • MATERIAL VERIFIED AND CHANGES NOTED ON PAPERWORK. 1:1 • ALL VALVE AND TIE—IN LOCATIONS NOTED ON AS —BUILT. 0 • NOTE BEGINNING OF MAIN, EOM,& LINE OF MAIN LOCATIONS. 1:1 • SHOW ROPE LOCA77ONS & CUL—DE—SAC RADIUS. 0 Fitter's Signature Company Employee ID# ProJect Manager Contact Information: DOUGUSITALO Ofte Phone 206-418-4236 Cell Phone 425-327-3451 GAS MAIN INSTALLATION RETIREMENT I / R SIZE PROP.FT. ACTUAL FT. TYPE MANUFACTUR 1 2' 70' W? E PROJECT PHASE NOTIF # ORDER GAS MAIN X702031031 107012169 IND MTR SERVICE X817298853 106076432 RETIRE GAS MAIN PRESSURE TESTING TYPE TEST: PRESSURE; TESTED BY: DATE ON: TIME ON: DATE OFF: TIME OFF: DESIGN: 60 PSIG SYS MAOP: 45 PSIG COST CODES: .CONSTRUCTION 011-102-1 PROJECT SITE C\I T" 0 r*-. 0 T" CALL 1-800-424-5555 2 BUSINESS DAYS BEFORE YOU DIG THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF FACILITIES 5 REAL ESTATE/EASEMENT NOT REQUIRED PERMIT EDMONDS 4 3 FUNCTION CONTACT PHONE NO DATE 2 PROJECT MGR: D. USITALO (206) 418-4236 1 ENGQ POWER: REV# DATE BY DESCRIPTION ENGR GAS: COUNTY SNOHOMISH EMER SEC 5 WorK Center MCNSEG DRAWN BY: PHUONG DAD (206) 418--4218 11/20/01 CHECKED BY: C. WOOLERY (253) 476-6300 114 SEC NE-31-27-04 OP MAP 1664-0658 PLAT MAP 166-069 APPROVED BY: D. USITALO (206) 418-4236 FOREMEN 4*1: U-MAP#(POWER) C IR MAP# CIRCUIT# FOREMAN #2: I MAPPING: JOINT FACILITIES ARRANGEMENTS UTILITIES CONTACT PHONE# PUGE MAIN & SERVICE EXTENSION SAP SUPERIOR ORDER# 107012169 SOUND 23405 78 AVE W RETIREMENT# ENERGY (BRIAN KING) 106076432 DESIGNED BY PILCHUCK CONTRACTORS9 INt- 9 SCALE: iff 50 1