Loading...
23424 100TH AVE W.PDF23424 1 OOTH AVE W 0 ADDRESS:,21q2� /00�� gy:6L-,6<) TAX ACCOUNTIPARCEL #: /00 BUILDING PERMIT (NEW STRUCTURE) #: COVENANTS (RECORDED) FOR: CRITICAL AREAS #:Dq-00�y DETERMINATION: E] Conditional Waiver XStudyRequired UWaiver CRITICAL AREAS #: DETERMINATION: fj Conditional Waiver E] Study Required El Waiver DISCRETIONARY PERMIT #S: DRAINAGE PLANDATED: PARKING AGREEMENTS DATED: EASEMENT(S) RECORD FOR: PERMITS (OTHER — list permit #'s): PLANNING DATA CHECKLIST DATED: SCALED PLOT PLAN DATED: SEWER LID FEE $: LID #: SHORT PLAT FILE: LOT: BLOC SIDE SEWER AS BUILT DATED: SIDE SEWER PERMIT(S) #: GEOTECH REPORT DATED: STREET USE/ENCROACHMENT PERM1fT #-1 FOR: WATER METER TAP CARD DATED: OTHER: LATEMP\DST's\FormskJana's Street File Checklist 5-14-08.doc 12c3.00' N Id OV53" E 0 14.50- 125.00' "OWNERICONSOTOR IS RESPONSIBLE FOR 1h Ah EROSIOrCONTROL AND DRAINAGE -1/ --- - ------------ Qw ----------- -------------------------------------- TOP OF SLOPE ..... - - ------ - -- - - - -------- ---------- - - ----- - ------ - - -- - - -- - - -------- a-,-- TAX ACCOUNT --- - ----------------- - - -- - - --------- - -- - ------------ - ----- \ TOI OF EXISTIW. 36- RAISED PLANTER WALL I 7-r �5� RAI.. PLAN E L*L- ------------- dx*T STMcl LOCATION OF NEW STFWCTURE IN40 EXCAvATION FOR FOOTIWGS - ------- .. U ----------- XIST G w GXISTING GUTTER DRAIN ,H, E IN :W I&I -BOTT4pH OF EXISTW. I- M7"38-0�,,O- or iW-TAINW- WALL ,3.00, A� 56 02' 23" SITEH f= SCALE : V a 20'-0' 0 0: W, 00554&00100201 A ., OVE Y PLANNING OVE Y PLANN 51TE ADD E,5 23424 100th AVE WEST d)- EDMONDS, WA c35020 LEGAL [DE5CRIFTION IRIC:HMOND FRUIT GARDEN TRAC;TS 9 BLK 001 D-01- LOT 2 CITY OF ED 5P a, 5-2-50 REC AF NO OeO5220302 BEING PTN LOT 2 BLK I OF SD PLAT/ VOL-0 - PG 44 uj AVE LINE z OWNER5 MIC-PAEL AND APRIL WEBB 23424 IOOTP AVE WEST r�-C[c:-ffEDIC) EDMONDS, WA95020 IAX -RETANW.* JUL 20 2009 )EVELOPMENT SERVICES CITY CF EMSOk GOVERAGE T LOT AREA. a,olrP 6F. L 100.00 (EXIST.) HOUSE: 1,400 S.F. (PROPOSED) ADDITION: 92 5F. TOTAL AREA- 1,4132 S.F. 1,41B2/a,015 = la.&2% 100T�4 4VF WE&T ------------------------ S/Dci��SWs I�IFERVICU& AfREA SM OT -TO yST- LOT AREA: 8,015 S.F. 10 EXIST. POUSE AREA: 1410 5F. TOTAL DRIVEWAY AREA: 1582 S.F. N G R T- H 5TAIR6/LANDING AREA: 04 5F. ApPROVED AS REAR PATIO AREA: 622 5F, '-- gyINI E TRIN (tiLq-.10 TOTAL AREA (APPROX.): 3,(01ba 5F. 4 NO NEW IMPERVIOUS AREA ADDED OE r CULATIONS Comer Fla&_ A- 112.50' h2mck jj e "r A2tual B: 112.50' Front -9a G: 105.00, Sides 4 2,6� D: 105.00, Rear 441.00/4' 110.25' AVG. GRADE 110.25' + 25' = 135.25' MAX ELEVATION Other' 123.00'MAX. PEIGPT OF ADDITION STREET RE PLANNING DATA STREET=FILE SINGLE FAMILY RESIDENTIAL Name: UJI Date: 7- Site Address: ;l- I a, Ll 100�� k-k Tax Parcel 0 0 0 N 0 Project Description: CL) Plan Check #: 'GLAD- �C'07 -OL17 0 Reduced Site Plan Provided: NO) Zoning: tzs- S Map Page: Corner Lot: (YES Flag Lot: (YES Critical Areas Determination #: vc)! -0.07,lb Study Required te-&A e LN- Waiver SEPA Determination: R Exempt El Needed (for over 500 cubic yards of grading) 0 Fee 0 Checklist 0 APO List with notarized form Required Setbacks Street: 5-- Side: -7 1 Side: -7 1 Rear: Actual Setbacks Street: D'.- Side: I � P Side: I � Rear: V El Detached Structures: J —k5 4- Rockeries: 1,A V"', Fences/Trellises: Bay Windows/Projecting Modulation: El Stairs/Deck: SuAdin Height Datum Point: Datum Elevation: Maximum Height Allowed: Actual Height: Other Parking Required: Parking Provided: Lot Area: Maximum Lot Coverage: 35% Proposed: Lot Coverage Calculations: 1!1 t9 -4- ADU Created: (YES / NO) Subdivision: Legal Nonconforming Land Use Determination Issued: (YES / NO) Comments \01A0 4\ 1 V,0 ,,V; . 0.- Plan Review BY: Planning Data Form 07-14-09.doc . A MOIN KADRI Consulting Engineering Geologist Phone: (206) 5516357 Fax: (208) 728 2956 P.O.Box: 16186, Seattle, WA 981167018,6--.E. *.. July 9, 2009 Mr. Michael Webb 23424 1 Oe Avenue West Edmonds, WA 98020 City of Edmonds Building Department APvi%PR0V,v FjwD PLAN RE: EVALUATION OF GEOLOGIC HAZARD: CRITICAL AREA SLOPE HAZARDS PARCEL 00554800100201 EDMONDS, WASHINGTON Dear Mr. Webb: This letter report presents the results of our critical area geologic reconnaissance of the site referenced above. The purposes of our work are to collect site geologic conditions with respect to the proposed development, and present our opinions and recommendations, if appropriate, for mitigating geologic impacts to the development proposed for this site. Our work was accomplished in accordance with our proposal dated July 8, 2009 and your acceptance dated July 9,2009. PROJECT UNDERSTANDING We understand that the City of Edmonds (city)- notified you to obtain a construction permit for kitchen addition at the single-family residence located at 23424 1 Wh Avenue West, Edmonds, WA 98020 (Refer to the Vicinity Map, Figure 1 and Site Map, Figure 2). The city required you to conduct a Critical Area Study because the Critical Area Reconnaissance Report identified the residence location within Geologically Hazardous Areas critical area. However, following your meeting with the city, you were informed to submit an abbreviated evaluation of critical area. This letter presents evaluation of the critical area and it's impact on the kitchen addition. We understand that no soil excavation will occur and the kitchen addition will be inline with the existing western wall of the residence (Figure 2). NFED 3UL 20 200S S%PpW& DEVELOPMEW SERVICES CTR. I HLET FILE CIV OF EI)MoNDS Mr. Michael Webb July 9, 2009 Page 2 SITE RECONNAISSANCE A reconnaissance of the subject site was conducted on July 9, 2009. The site is located on the east slope of a broad ridge. The property is located to the west of 100 the Avenue at an elevation of approximately 144 feet contour line (Figure 3, LiDar Map). Western property boundary is located at approximately 376 feet contour line. An elevation change of approximately 20 feet occurs from the top of slope to the western wall of the residence. Two measurements of slope inclination.indicated approximately 49% slope at theriorthern mid -slope portion and 37% at the southern portion of the slope. A recently published geologic map of the Snohomish -King County area (Figure 4) shows the site underlain by Advance outwash deposits (Qva). Vashon Till (Qvt) deposits are present at higher elevations above the Vashon Advance outwash sand deposits. Shallow soil exploration at the site indicates dense, gray, gravelly sand. Soil probing suggests dense soil along the slope area. No indication of drainage swales or small streams was observed during the reconnaissance. No emergent seepage was observed within or near the site. Because of the vegetative cover and good infiltration capacity of the surficial soils, little or no surface water runoff occurs within the site, and no erosion problems were observed within the site. Although minor scarps and sloughing of near surface soils occur within the steep slope area, no indication of ancient or incipient large-scale slope failures was noted on the property. SUMMARY The subject property appears to be stable at the present time, and probably has been stable during historic times. Making changes in the slope geometry, such as making cuts and placing fills, may increase the potential for instability to develop but no such activities are planned for the site. Increase in the soil moistureby storm water retention ponds, and concentrating runoff from covered surfaces (roof drains and paved areas) may also increase the potential for slope instability but no such alterations are planned for the site. Webb Letter Report Mr. Michael Webb July 9, 2009 Page 3 CONCLUSION AND RECOMMENDATIONS It is our opinion that this site can be altered (kitchen addition) without compromising the stability of this or adjacent properties provided that proper site development procedures are followed. The native soils underlying the site slope consist of glacially consolidated sand and gravel. While these soils are suitable for conventional residential foundation design and construction procedures within the area identified, no excavation is planned for the kitchen addition. It is our opinion that the existing steep slopes within the site are presently stable but are susceptible to erosion and shallow debris slides if disturbed by construction or other activities. However, no excavation is planned for the site. LIMITATIONS Our conclusions and recommendations are based on our understanding of the project as described in this report and the site conditions as interpreted from our visual observations and the references cited. Also, the conclusions, and recommendations contained in this report are based upon site conditions as they presently exist, andfurther assume that the subsurface conditions are not significantly different from those described in the references cited as being typical for this - general area. Within the limitations of the scope, schedule, and budget, the conclusions and recommendations presented in this report were prepared in accordance with generally accepted professional engineering geology principles and practice in this area at the time this report was prepared. We make no warranty, either expressed or implied. This report was prepared for the exclusive use of Mr. Michael Webb. It should be made available to prospective designers and contractors for infori-nation on the factual data only, and Webb Letter Report Mr. Michael Webb July 9, 2009 Page 4 not as a warranty of subsurface conditions such as those interpreted from visual observations or from published references cited in this report. Sincerely, r ,Di Wa ';�e'oc Engineefing Geologlsll 'no 1718 CID 0 '7 1(010 %Ved eO Moinoddin M Kadiri Moinoddin Kadri, L.E.G.; L.G. Engineering Geologist Enclosures: Figure 1. Site Vicinity Map Figure 2. Site Map Figure 3. LiDar Map of Site Vicinity Figure 4. Geologic Map of the portion of Sno-King Area REFERENCES CITED Booth, Derek B., Haugerud, Ralph A., and Troost, Kathy Goetz, 2003, The Geology of Puget Lowland Rivers in Montgomery, Bolton, Booth, and Wall, eds., 2003, Restoration of Puget Sound Rivers: Available from University of Washington Press. Booth, Derek B., Cox, Brett F., Troost, Kathy Goetz, and Shimel, Scott A., 2004, Composite Geologic Map of the Sno-King Area: Seattle -Area Geologic Mapping Project, University of Washington, United States Geological Survey. Webb Letter Report 'N.EV&.0 N.D.O.LP