23525 84TH AVE W.PDF111111111111
7965
23525 84TH AVE W
L]
L]
ADDRESS:
TAX ACCOUNT/PARCEL NUMBER:
BUILDING PERMIT (NEW STRUCTURE):
COVENANTS (RECORDED) FOR:
CRITICAL AREAS:— OR DETERMINATION: [] Conditional Waiver n Study Required A<aiver
DISCRETIONARY PERMIT #'S:
DRAINAGE PLAN DATED:
PARKING AGREEMENTS DATED:
EASEMENT(S) RECORDED FOR:_
PERMITS (OTHER):
PLANNING DATA CHECKLIS'
SCALED PLOT PLAN DATED:
SEWER LID FEE $:
SHORT PLAT FILE:
SIDE SEWER AS BUILT DATED:
SIDE SEWER PERMIT(S)#:
GEOTECH REPORT DATED:
STREET USE / ENCROACHMENT PERMIT #:
WATER METER TAP CARD DATED:
LOT:
LID #:
BLOCK:
LATEMP\DST's\Forms\Street File Cliecklist.doc
PLANNING DATA 11 street=Riel
Multi -Family * Commercial
Name: Pdmovids) Lutviexan church
Review Date:
Site Address: 7.156?,5 9+'T" Ave W.
Permit Number: BLD.200 0 9 9 1-
ProjeCtDescription* Add wail,:: CAA re-friltr6ition unitep (exteriolr)
61aJ9 C.7VA0WV1 C
Zoning: P-6 —S / P-M — 1-5
Comp Plan: 6f-wipani- /corridor
Corner Lot: NO)
(0
lag Lot: (YES
1
Variance:
Shoreline:
ADB: A,
cup:
Pre-App:
LLA:
Plans Match AD13 Approved: (YES / NO)
Lot Aggregation Required: (YES NO)
Use Proposed:
Use Permitted: NO)
SUbdiviSion/Legal/Recording Number:
Legal Nonconforming Land Use Determination Issued: (YES is
Critical Areas File Number:
0 �StUdy Required Gra' 101 q q - 0 115 9 10Y Me-3
N waiver
SEPA Determination: e'xempt
El > 500 cubic yards of grading?
5 - new dwelling units?
El Parking f or 20 - vehicles?
El > 4000 square f eet of new commercial area?
RequlredSetbacks
street,
Side-
Sid&
7
R pe aw
W
A=alSetDacks
Street:
Side:
'1'?) g -M
rWtAr-
Side: RAM-
1-2121
0 Structures: ROCkeries/Retaining Walls 9 Fences/Trellises/Arbors Trash Enclosure Signage
11 Modulation: Bay Windows 9 Projecting Modulation * Chimney/Fireplace
0 EncroaChments: Covered DeCk/Porcri 9 Uncovered Unenclosed < 30" DeCk/PorCh/Patio
> 30" Stairs > 30" Eaves !�� t a 10 1 s, 2- 'F2, f Yvon F— - — o JK—V��
Parking Required:
Parking Provided:
Coverage Required:
Coverage Provided:
Lot Area: 140 6 `Y7 L ev �Vv Vf V1
Lot Coverage rp V1 ew
Calculations:
BUIldIng Height
Datum Point: -H60- Y11D +PF o r
Datum Elevation: p 4"
Maximum Height:
7EA
ct -7
ual Height:
SIgnage
Existing/Proposed:
PlanRi�vieWBY: Gina tde�ia",A�gbClate'P[6n'n�e"t'�
or
PLANNING DATA
Multi -Family 9 Commercial
LandSCaping NoteS
Landscaping Matches ADB Approved: (YES / NO) Landscaping Bid Provided: (YES NO)
Landscaping Bid Amount: S L�nclscape inspection Fee: S
strwr me
COMMeWal Parking Analysis
Business Name
Type/Use
Parking Ratio .
Tenant Area
Required Parking
1
!3ff, '\
+ s�j-
LA ct -e- ni-s
Total Parking Required.
Total PCrking Provided.
771, +-10
Witf-FaM11Y Parking Analysis
# Bedrooms per Dwelling Unit
Parking Ratio
# Units
Required Parking
Studio
1.2/D.U.
I Bedroom
1.5/D.U.
2 Bedrooms
1.8/D.U.
3 - Bedrooms
2.0/D.U.
Total Parking Required.
Total Parking Provided:
Other
* 011LArCh IOUO+.V�l ICIE57 (a66ee,.Gor)
" OLVInt'Ked to edmonC16 1741691.19q+
• CVXUkrGh./6kAyCa(-f_, Con6(de-req \AIYL,011� P-6
• da9 CAM c.;rN dtyits 7am — (o pryl M F K OT +ronr:,ferrc
PMAt MVW pmew SW be
CONWOU vftx,o Allt" Lhe ofthe
or-ast6cm is dwm on *9
At.. i
4_2w *Wft. &a* Wdlins Wm*n W"
� aw be the =k* da up&-&*
Plan Review By: Gina Coccia, Associate Planner
�iole.i.
PLANNING DATA
New Commercial / Mulffamily Proiects
SITE ADDRESS: 2-35 Z5 — M#' Avc. Ld. —ZONING:
USE(S)PROPOSED: Lk,--nn- 60,0-i��n6cmcaiL,
ALLOWED?: ZeL
LEGAL NONCONFORMING LAND USE DETERMINOION ISSUED —
CUP File: To Allow What Uses?:
ADBFILE#: 2,ot�o-its-
PARKING:
Use: -
No. Spaces Required: 14
X
(floor area, # employees, etc.) 49
Use: -
No. Spaces Required: lspaL, /4,
X 3o<y3o
(floor area, # employees, etc.) 7s-
Use:
X
No. Spaces Required:
(floor area, # employees, etc.)
j
Use: Al
p" lok oi- 49 sgaiei, No. Spaces Required:
X
(floor area, # employees, etc.)
Total Required:
Actual Provided: 78'50 -Atu.
SETBACKS:
Required Setbacks:
Front: 15', j5- Left Side: '7 13, to -Right Side: Rear:
Actual Setbacks:
Front: 4k, Left Side: Zok I Right Side: -Rear:
Street map checked for additional setback required? (Yes/No)
MAXIMUM FLOOR AREA: ?_ 5 �3% ".,Nc
Maximum Allowed: Actual-V,
49 1 .'S- ,, 6 3,5, 8rs' Z-49,
BUILDING HEIGHT:
Maximum Allowed: 2,5' Actual Height: zz.!5,
Modulation Allowed?: Modulation Height:
Datum Point: *g ,eiiiy, gnL��attF Elevation: too,
Elevator Penthouse > 3 feet 6ver height I! mailk. No If
so,VAR#
0
LANDSCAPING:
2
Matches ADB approved: W( - 10
L 1,A
Bid Provided? Bond Amounf(10&/o bid): W* Cfjz,,q,
Z
CRITICALAREAS#: i99&)0i13j
SEPA DETERMINATION:
SHORELINE REQUIRED?:
Continued ...
1Afibrary\AP1andatNewConun.doc
9
0
DATE: 41,917,., PLAN CHK#* o) - o6,3
NAME OF BUILDING PERMIT APPLICANT:- (-E.L(-
PROJECT DESCRIPTION: z 3/3
2 st*1=1 I
(COU4, �, k—, , m �-', 5b:*- 7 PAr��
4
ADB FILE #: -,�()oo - fi�- OR DATE WAIVED:
PLANS MATCH APPROVED PLAN: Mtrt Aon tj�x 6e,.,
ko" —ket^ AWA
omA 61.-v ftwv, t�� vx, fv4a.
pe-4f' /4Z oelat.,. OK—.
SUBDIVISION:
LOT AGGREGATION REQUIRED?:
Z,
o
5 L,) 6,,, 4; ok
REDUCED SITE PLAN (8.5X1 1) PROVIDED FOR ST�E�ZIL
E?
OTHER: A+-
re� -1-A st
C&O /,, m
14-s4tm-"m b�y,
.,Aeh*." 41�1z—� aA�" ckw-,,,
-MM Z-4. Ct- Ig 04 AA a-W,4 k,- oqe
m M &,,A
C44f 'j AMMUA
AfpVc� 1-j �WU �LAI IA4CS .I, *ktj
Plan Review By:
1:\fibrary\AP1andatNcwComm.doc
2nxwm Lwwe
(8 - 10 "own
�
Tn
9XISTWO wwwT wimis LOT
zz
4 a. SPA=
wal all AXISOVED
(10) THLUA
Al
PLM
AMA
--- — — ---- -----------
SENCHILARK'
0 TOP OF WUFTWIQ Ca . Is" 236TH Sr. Sw
-"Smwmwffm
SITE AREA = 186,373 SF
OCCUPANC . Y = A-3 EXISTING BUILDING AREA 13,995 GSF
lbONSTRUCTIgN =- V-N PROPOSED ADDITION = L2,3i3 GSF-
TOTAL PROPOSED AREA 16,308 GSF
NOYE:
KITCHEN IMPROVEMENTS NOTE,
WILL BE COVERED SECHMSCAL WIPC SMALL
UMEA SSAMun MW w UNDER 8EPARM PERMIT
APPROVED BY PLANNING
o6.,v— 4-112,/ Z,�q
r
J L
r
711
&ib�6iEb
LOAOM ARM
EXISTING SOUTH PAMIUNQ UYT in
II SPAM M—wol"
COMM" Un
Domm
SITE PLAN
r-W
STRE9 FILE
a
BULDNQ HUM CALCMATION
COMM A EL "T4'
COFNER a Iz- lqE:E--
COFWM C 13-
CORNER 0 EL I0r4r
TOW 4!r-ff 14 GLIG�v
ALLOWADLE BUILDING HEKW w —
IIAXWAI ALLOOMILK SURMINIQ HIMONT;
( - EL//&
PROPOSED MAJORK&I BUILDING ELEMM --�*
—I
In
eq
8"A"C'U"W'40- 78 PARSONS WPM AMM
Ila PEW SUM '4 - 49 PARKM SPACED MOGUL
TM&FGFR� is param Spam namumm.
23525 84th Ave. W
9XINTING PAPIUM - To SPACES
Edmonds, WA 980�s
Addition to Christ Ehangellcal
Lutheran Church
RECEIVED
APR 112001
PERMIT COUNTER
17-�
E D N\0 NT---,� UYTA ESAR &A 0 tL�
2.-5L5 Z5 - 9 4r* wj q- W,
F-Dh&b N'09 . Wk. C109-6
Pt,
I I WCA(� so'
vAfzvj mra
le /
PAMKI Ta.
1^fdoefetf'od J*.,Acx.
ex.'s 1.0vv
ZRO" D AS NOTED
ri(GINEERING
7Qe: tL /,,o I...
-W APPROVED BY PLANNING
Y. LgVA,?A/ 17-.
Zone P-5- SA -TA' Comer A Flag —
Setbacks Required Actuall --tD ffld 'S
Front
Sides t4 /F---2
Aeap W
Other
Height *7' cl
uv\i+ep -to matc-h
ey-terive Of RECEIVED
DEC 0 5 2008
BUILDING DEPARTMENT
CITY OF EDMONDS
'2
6T SW z— 'r 1),
City of Edmonds PERMIT NO: .� 9565
P-V.1QVHT 1R.YlP PlP.Q. qh hA1_1-,-
Qlr'nlP QVWVID PUIDX41T
" C. 1 161 - WM
Address of Construction: 21--Z_672, AY WE 5L LID #
Property Tax Account Parcel No. 67V7-c)rx)--o2�_,5-o1q-
Attach copies of all access and utility easements Verified and Approved b
Owner-anftr-Contractor: �'-VAX3>
Contractor License #: CX>0 I k-44 95 C_ CCT 1 7 �Z-_PS -i —Building Permit#: 'ZOO I - (0 Z-0 Z_
Single Family Invasion into City *Right -of Way: [:1 Yes �(No
Multi -Family (No. of Units
Commercial (No. of Units
*RW Construction Permit #
Cross other **Private Property: E] Yes 0 No
Public "Attach legal description and copy of recorded easement.
Owner/elontracto-ir
ro
N
Owne r con actor signidure�afid acknowledgement statement: Date
Illesigning for this perm y that I have read the City's public handout entitled
Siyde Sewer Specifi . cations, and shall comply with all City requirements -outlined therein.
2 CALL DIAL -A -DIG (1-800-42ilq��_5555) BEFORE ANY EXCAVATION W
V FOR INSPECTION CALL 425-771-0220 extenskonl3i6W
24 HOUR NOTICE REOUTRED FOR ALL INSPECTION REOUESTS
..................
........ ...... ... . ..... ... ... .. .
. . ......... . . . ...... . .....
. ... ......
. ........ ...... FOR OFFICE USE ONLY
............... .. . . . . ......
Permit Fee Repair Fee Issued By: 4W
Trunk Charge $ 4114 Date Issued: ///,A Z4
Assessment Fee $ Receipt No:
City Permit Surcharge Fee $5.00 Total Fees Paid $
NOTE IF JOB SITE IS NOT READY FOR INSPECTION WHEN
INSPECTOR ARRIVES A $45 RE -INSPECTION FEE WILL BE CHARGED.
Job Site Ready YES NO Date: Initial:
7 Parbal Inspection: Date: Initial:
Pa
I rtlal Inspection: Date: Initial:
FINAL INSPECTION APPROVED: Date: \21�jd— Initial: 6-1 As -built to Street File:
1,� PERMIT MUST BE POSTED ON JOB SITE t�
White Copy: File Green Copy: Inspector Buff Copy: Applicant
L;temp;bldg;forms,,ssperTniijig4/00
V ED-Af
A -"fo
CITY OF EDMONDS
COMMERCIAL TENANT IMPROVEMENT/ REMODEL COVER 9HEET
4C. 1,C)o
Directions: Applicants are to complete the Information In the WHITE BOXES ONLY (Shaded boxes are for City use only).
This cover sheet must accompany each building permit application for a commercial tenant Improvement/remodel project.
PLAN -ipRECK #z�:.':n-
ANT
APPLIC f LEI
DATE RECEFViii�..
PROJECT ADDRESS
PROPERTY TAX ACCOUNT PARCEL #
UNIT #
DESCRIPTION OF WORK
OWNER PHONE Y2-�'�--7-7g —,17
CONTACT PERSON
PHONE 745,57
FAX E-MAIL
MAILING ADDRESS
PFAX CORRECTIONS MAIL CORRECTIONS E-MAIL CORRECTIONS
BY SIGNING THIS STATEMENT I UNDERSTAND THAT I AM THE CONTACT PERSON FOR THIS PROJECT. IT IS MY RESPONSIBILITY TO
COORDINATE ALL SUBMITTALS WITH THE CITY AND ONLY I CAN MAKE INQUIRIES ON THE STATUS OF THE APPLICATION. I
UNDERSTAND IT IS MY RESPONSIBILITY TO DETERMINE IN ADVANCE OF PERMIT SUBMITTAL ANY DISCRETIONARY PERMITS THAT
MAY BE APPLICABLE TO THIS PROJECT. I ACKNOWLEDGE THAT TO THE BEST OF MY ABILITY I HAVE SUBMITTED ALL NECESSARY
DOCUMENTATION IN ORDER TO MAFEk-X-C`OM4ETE APPLICATION AND NO DISCRETIONARY APPROVALS ARE REQUIRED.
60DE -0171614� 1997'UBC, UMC, U`P`C-,-Vr!�EC, VIAO WITH AMENDMENTS (including State Barrier Free Code)
TYPE OF CONSTRUCTION_ -��-14?-OCCUPANCIES
—swaig
NUMBER OF STORIES B A S E M E N T S tj
NUMBER OF EMPLOYEES TOTAL PARKING SPACES DEDICATED TO TENANT
6A-4A00 04-01WAkINd SOAd-ES'"
EXISTING
PROPOSED -S
STRUCTURAL CALCS PROVIDED L-j LIGHTING BUDGET PROVIDED L-1- RECEIVED
EXISTING AUTOMATIC SPRINKLER SYSTEM [:] MANUAL [:] AUTO F�N 0 NJ E �11
EXISTING FIRE ALARM SYSTEM 1:1 YES aNO
biSC*R*&iOkARY APOA&A'LS'� A D B 200-11-5� C U
FEB Z a -v-1
DEVELOPMENT SERVICEZ CTF1
OTHER CITY OF EDMONDS
7
PARKING INFORMATION (City Use Only)
USE I SQ.FT. . FACTOR
TOTAL SPACE . S REQUIRED
TOTAL SPACES PROVIDED
BARRIER FREE SPACES REQUIRED
.BARRIER FREE SPACES PROVI . DED
STAFF COMMENTS 79 5 g 1&,,
,SPACES
REQUIRED
SEPARATE PERMITS (City Use Only)
MECHA:NICAL/,HVAC FIRE SPRINKLER.,'
PLUMBING(K4�16
GREASE TRAP
Any request for modification,
variance or other administrative
deviation (herinafter "variance")
must be specifically called out and
Identified. Approval of any plat or
plan containing provisions which do
not comply with the city code and for
which a variance has not been
specifically Identified, requested and
nsidered by the appropriate city
fical In accordance with the
appropriate provision of city code or
state law does not approve any
items not to code specification.
0
VIAQ CODE COMPLIANCE INFORMATION (Table 3-4)
OCC,LOAD/ TOTAL
SQ.FT FACTOR. C-ER
STAFF COMMENTS
OCCUPANT LOAD CALCULATIONS (City Use Only)
STAFF COMMENTS
PERMIT ISSUANCE APPROVALS (City Use Only)
PLANNING REVIEW & APPROVAL DATE
CONDITIONS OF APPROVAL:
FIRE REVIEW & APPROVAL DATE4b-3
CONDITIONS OF APPROVAL:
BUILDING REVIEW & APPROVAL DATE
CONDITIONS OF APPROVAL:
L:\temp\building\forms\Tl-rvw.vsd -- 7/00 W51-.)
VP
tical Areas Checklis t5,9
CA
----------------
----------------------
sy/vegetation)
"Ka leformation (soils/topography/hydrolog
'Location: 3 r R!4-"4 �V- E6 MA Ai bq�
-:.t Address, -1 WO 0 V�) Q 9
?r0perty Tax Account Number:
I
I . Approximate Site Size (acres or square feet):
4. is this site currently developed? --K- yes; no.
if ves; how is site developed? CA
.1
5. Describe the general site topography, Check all That apply.
Flat: less than 5-feet elevation change over entire site.
Roiling: slopes on site generally less than 15% (a vel-tical . rise of I 0-feet over a
horizontal distance of 66-feet).
Billy: slopes present on site of more than 15% and less than 30% ( avertical rise of
10-feet over a horizontal distance of 33 to 66-feet).
Steep: grades of greater than 30% present on site (a vertical rise of 10-feet over a
horizontal distance of less than 33-feet).
Other (please describe):
6. Site contains areas of year-round standing -water.. o &JL5' Approx. Depth:
a
7. Site contains areas of seasonal standing water: Qo�jG-__; Approx. Depth:
What season's) of the year?
8. Site is in the floodway �4 0 floodplain_ of a water course.
9, Site contains a creek or an area where water flows across the grounds surface? Flows are year-
round? Flows are. seasonal? (What time of year?
10. Site is primarily: forested meadow shrubs mixed
urban landscaped (lawn,shrubs etc)
11. obvious wetland is present on site:
For. I
-------- - -- - -----
C, aff-Use On
ty Y---7
S,CS.mapped
w and inyentor dicates
Y-:0f C.A.I ni�p- in wetlang preseat on sitel.
'-.:CritiCa*i A=s''inve tory oir.C.A; rn indicates:tri-tical Aied-on-SiLd
AP
5. site M".ithin desifgnAted tailh.subsid6tice 1�aridslide haz�xd,.:ar-'-e0-:-
6.. Site desiEna-ted drithe Ecvironrncntal1y.-Sensitiy� Arqs M41:i*�--�*�
DETERMINATION
. . . CONDITIONAL WA4V
-�TJJJDY F-EQUIREL).:
WAIVER
?
Reviewed by:
rtAY— 17-1999
15:49 CITY OF EDMONDS 4257710221 P.02/07
RECEIVED
City of Edmonds JUN 0 11999
IMBPCZN��� --.- RUA= GGLIW191a
IR�W ClUTICAL AREAS CHECKEIST
The Critical Areas Checklist contained on this form is
to be filled out by any person preparing a
Development Permit Application for the City of
Edmonds prior to his/her submittal of a development
permit to the City.
The purpose of the Checklist is to enable City staff to
dcten-nine whether any potential Critical -Areas are, 'or
may be, present on the subject property. The
information needed to complete the Checklist should
be easily available from observations of the site or
data available at City Hall (Critical Areas inventories,
maps, or soil surveys).
An applicant, or his/her representative, must fill out
th� checklist, sign and date it, and submit it to the
City. The City will review the checklist, make a
precursory site visit, and make a determination of the
subsequent steps necessary to complete a development
permit application.
Please submit a vicinity map along with the signed
copy of this form to assist City staff in finding and
locating the specific piece of property described oil
this form, In addition, the applicant shall include
other pertinent infor m-ation (e.g., site plan, topography
map, etc.) or studies in conjunction with this Checklist
to assist staff in completing their preliminary
assessment of the site
I have completed the attached Critical Areas Checklist and attest that the answers provided are factual, to the
best of my knowledge (fill out the appropriate column below).
ONN-a er/Ap p lien nt:
k 5 —% a C iA
Name
Z 3 S'!)- �- — 9- (47" AV 0 W
Street Address
City /State
I Zip
J 0/,' '747 .2 1
Telephone
Signature
Date
RECEIVED
Applicant Representative: JUN 0 11999
01V4=ERVICTS CT.r!,
F:1nw6hu1'1
Name
Street Address
1VWz UL).&.
city State Zip
&-Z J- ) 7 76, - all 9
Tel hone
Signature
IF
Date
c:rec e pti on\j anAcac Woc
; � -- 7. - .
(over)
411? C. 1 B913
June 9, 1999
Christ Lutheran Church
2352584 th Ave. West
Edmonds, WA 98026
9 0
CITY OF EDMONDS
121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 - FAX (425) 771-0221
DEVELOPMENT SERVICES DEPARTMENT
Planning - Building - Engineering
Subject: Determination regarding Critical Areas Checklist # 99-159
BARBARA FAHEY
MAYOR
Dear Applicant:
Enclosed please find a copy of the Critical Areas Checklist you submitted. The "DETERMINATION" reached by the City
is located on the reverse side of the form (bottom of page).
It is very important for you to retain a copy of this Critical Areas Checklist "DETERMINATION" for your records.
IMPORTANT INFORMATION TO BE NOTED:
PLEASE EXAMINE THIS"DETERMINATION"FOR ADDITIONAL REQUIREMENTS. YOU MAY NEED TO SUBMIT
ADDITIONAL INFORMATION SUCH AS AN ENVIRONMENTAL CHECKLIS OR CRITICAL AREAS STUDY.
The 'DETERMINATION' for the Critical Areas Checklist you submitted is a site -specific determination not a
project -specific determination.
You must submit a copy of the CRITICAL AREAS CHECKLIST and DETERMINAT10N WITH ALL 4m
PERMIT APPLICATIONS or YOUR APPLICATION WILL NOT BE PROCESSED.
Permit applications include the following:
Building Permits
Conditional Use Permits
Subdivisions
Variances
Applications to the ADB* Land Use Applications
Any other development permit applications. -
Enc: Critical Areas Determination
* Architectural Design Board
Thank you.
Sharla Graham
Planning Secretary
C:ReceptionUana\CRLTR.doc
Incorporated August 11, 1890
Sister City - Hekinan, Japan
Name of Proposed Project:
Owner/Applicant:
CITY OF EDMONDS
O�
TRAFFIC IMPACT ANALYSIS
01�4p%
WORK SHEET �9 V4tq
Ed rV, or% A, L":�-� er-ct" 0-(&tv-cA-t Leav-r%.Ik,� Ce�4er-
FEJYVIO�Ids Lwt4feal, C14't'v-J,
Name
2 3 5.2 S' 9 �� A.�e- Ld
Street/Mailing Address
t�d�,QKJ,s WA -
City State Zip
Telephone: 2 9 (o - -26 0 1
Applicant Contact Person:
A
Name
A35.-15
Street/Mailing Address
"-1^ Jkl ds L4//A- Jr-6 -a 6
city State Zip
Telephone: !Lld- r— -2 -7 & —,a (a 0 /
Traffic Engineer who prepared the Traffic Impact Analysis:
At A
Firm Name Contact Name
1. PROJECT DESCRIPTION
a. Street address (if known):
.2 _q A-ue- W
b. Location: &-,P, 4
— le� J!L AU3e Ld -It-,Z a 3 t- 110
c. Specify existing land use:
Telephone
9
0 " -=G q (Attach a vicinity map and site plan.)
NJ
d. Specify proposed type and size of development: AJ0
e. When will the project begin construction and when will it be completed?
6trpl;ed -Fe r ehanj e el kf e — m,,�4 /A w" &4mle-S A-3 0#v - /0-0- --- oo
I
f. Define proposed access locations: Exl—"f- &Z
g. Define propose�Tghtdistanl at site egress locations.
ME- - - IMMAM", 111111�11FIIV �- �111 �,
Page I
Five Years After Opening LOS:
With Project:
Without Project:
Note any assumptions/vaniations to standard analysis default values and justifications:
7. MITIGATION RECOMMENDATIONS
State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact
fee shall be calculated from the Edmonds Road Impact Fee Rate Study Table 4 (attached) and as identified
in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC 18.82.130.
419d iW-ro w Id he ca e r &n ol IqA ±uYn- Ja
m Acr--s at-e
A?�Vj()Vr , -t4oJED
_U NS
J�s porT
SAENGR\D�61\C4y Pmjecu\TLA Gutdehnw\Tmflnq)Ana1yWork 9-04.&c Paize 5
COUIM OF SNOHOMSK — BMDMG DEP
. 1w
CERTIFICATE OF OCCUrAISICY
922
NO.
23525 - 84th W., Edmonds, WA FIRE ZONE
STREET NO.
:�i ....................... . .. .................... Tn—to Existing Churc OCC. GROUP
Fe� owship 11 'a . Ad, n
OWNER Christ LuthJan Church USE ZONE
23525 - 84th W., Ell s, WA TYPE Or- BLDG. V -nne-hOUr
38279
PLAN NO.
BUILDING PERMIT NO. �
HAS BEEN INSPECTED AND THE r-OLLOWING OCCUPANCY THEREOF IS HEREBY AUTHORIZED:
I AREA UNDER
THIS CERTIF.
MAXIMUM
OCCUPANT
MAX. ALLOWAal
FLOOR LOADS
OCCUPANCIES
SQUARE FT.
LOAD
LOS. PER 50, FT.
10260
791
100# L-L-
B-2
REMARKS: POST FELLOWSHIP HALL - 338 KAXIMUM OCCUPANTS
POST FIRESIDE ROOM 68 MAXrMUK-OC NIS
....... ... .... r-,
101 jliljj'ij;iijjl,ljUM OCCUPANI S
POST EXISTTI�
PLUMBING INSPECTOR: 0 DATE. 1/13 _1975
5 19/4
BUILDING INSPECTOR: Ro DATI 5 1974
ARSH L
REAU
JFIRIT'M�ARSH I N BU
- C
FIRE �l, R� OU . y F1 N BUREAU
FIRE DIST.- SNO. COU
BY:
Mill of Building and Plumbing
POSTING: The Certificate of Occupancy shall be posted in a conspicuous place on the premises and shall not be removed
except by the Building Official.
4 X ..
Ae /�-kll Xeg".- /
J�o X101" / J-/ r`5)44`11ty
-zr) elo.,V-ZAL"'Ihow
leell4k,'q 12
�3.W441rj 6B. 0
SIR EET FILE
STANDAff DRAINAGE DETENTIOJ SYSTEM
WORKSHEET
W
. OWNER
ADDRESS Z--3 5 Z57
Xa 240
CALC BY:
PHONE: tlzf - (47z- 07& f
DATE: ZZZ
'"DESIGN DATA*****
IMPERVIOUS AREA PIPE DIA PIPE LIS ORIFICE
11y/ Z4!�V Dc 714% ly A-4
DCTENTION PIPE LENGTH
//0 0 FINISHED G
MINIMUM
2,3 0 slol- TIGHTLI E
ZY TO IX SLOPE
'7 1
5r
UPPER CATCH BASIN
ING LID
']CAL)
6 N Ep�tMNCfop
kifi URE� or
CONC BOX OR RISER
OUTLET CONTROL
TMIN.
CONTROL CATCH BASIN
SYSTEM CROSS SECTION
2'X2'X61.DEEP, 4-6' SPALLS OR EOUAL
FROM CONTROL CB 2-X 2'X 3- DEEP," 3/4' CRUSHED ROCK
FROM CONTROL
PJPJ?AP OUTLET
RECEW-ED
MAR 19 2001
DEVELOPMENT SERVICES CTR
CITY OF EDMONDS
M
LdNG.
WITH RAr
WASHEW DRAIN ROCK
RUNOFF SPREADER. TRENCH
FOOTING D"NS SMILL NOT BE CONNECTED 70 DETENTION SYSTEM
NOTES:
HU'L
Call Eu&eering Division (771-MO) for a tightline and detention system inspection
before backfilling and for final inspections.
2, Responsibility for operation and maintenance of drainage systems on private property is the,
responsibility of the property owner. Material accumulated in the -storage pipe. must be flu. -
out and removed from the catch basins to allow proper operation. The outlet control orifice
must be t oven at all times.
APPROVED BY
DA TE
Impermeable
Area Sq. Ft.
Table 1 — Detention Pipe Sizes
Required
Vol Cu Ft
,'Pipe Diameter
15u 18U 24u 30"
2000
50
40
28
16
10
2500
62
50
35
20
13
3000
75
60.
42
24
15 Bequired pipe
3500
87
70
.49
28
18 length in feet
4000
100
80
56
32
21
36
23
5000
125
100
70
40
25
Note: Allowable Pipe Materials:
Impermeable
Area Sq. Ft.
Reinforced Concrete
Aluminized Steel
Aluminum
CMP Asphalt Coated
N-1 2 ADS (Not permitted on roads)
Table 2 — Outlet Orifice Sizes
Outlet Orifice Diameter (Inches)
2000.
5/8
2500
5/8
3000
3/4
3500
3/4
4000
7/8
5000
7/8
Table 3 — Rectangular Catch Basin Requirements
Detention
Max. size
Catch Basin
pipe diameter
knockout
Type
< 18"
2011
Type 1, CB. 15
180 to 240
26u
e B 16
24�
360
14 19 19 (48' Basin)
7vo 1, C13
36" to 42"
'42u
Type 11, C13 19 19 (54' Basin)
*Source: Assoc. Sand & Gravel Co. Standards
5
Revised 3/16/95
0 0
April 11, 2001
Christ Lutheran Church
Edmonds, Washington
Attn: Korey Berg, Building Committee
Re; Landscaping New Addition
The following existing shrubs and'trees will be transplanted and stored for new plantings on the
east side of the new addition.
Quant
Botanical name
Common name
Size
4
Pieris Japonicd
Lily of the Valley shrub
61
2
Evergreen azaleas
30-36"
3
Prunus Laurocerasus Zabeliana
Zabel Laurel
30-36"
2
Charnaecyparis Pisifera Squarrosa.
Plumosa Cypress
20-25'
3*
Acer Platanoides
Norway Maple
12-15'
* Donated trees to replace Plumosa Cypress if transplanting is not successful.
Please stockpile surplus soil and the concrete sidewalk for landscaping use'. Retain the existing
large outcropping rocks adjacent to the parking lot. The labor cost for installing all materials and
plants on the east side of the new addition will be $500.00.
International
Society Ernest R. Kronq
Itz
of Arboricultule Landscape Design
Certified Arborist Consultant
CERTIFIED ARBORIST 6712 228t" St. SW
Mountlake Terrace, WA 98043
Ernest Kronquist (425) 776-0379
CertifiCate Number: P.N-0274
Expiration Date: 6 . 130/02
APPROVED BY PLANNING
L/
/Va i?*-,A
RECEIVED
APR 112001
PERMIT COUNTER
0
CqTY OF EDMONIPS
. . . . . . . . . . .
ENVIRONMENTAL CHECKLIST S.- P 2 9 21,110 0
1 WS9
PWpose of CheckW.-
The State Environmental Policy Act (SEPA), chapter 43.21C RCW, requires all governmental agencies to consider the
environmental impacts of a proposal before making decisions. An environmental impact statement (EIS) must be prepared for all
proposals with probable significant adverse impacts on the quality of the environment. The purpose of this checklist is to provide
information to help you and the agency identify impacts from your proposal (and to reduce or avoid impacts from the. proposal, if it
can be done) and to help the agency decide whether an EIS is required.
Instructionsfor Applicants
This environmental checklist asks you to describe some basic information about your proposal. Governmental agencies use this
checklist to determine whether the environmental impacts of your proposal are significant, requiring preparation of an EIS. Answer
the questions briefly, with the most precise information known, or give the best description you can.
You must answer each question accurately and carefully, to the best of your -knowledge. In most cases, you should be able to answer
the questions from your own observations or project plans without the need to hire experts. If you really do not know the answer, or
if a question does not apply to your proposal, write "do not know" or does not apply". complete answers to the questions now may
avoid unnecessary delays later.
Some questions ask about governmental regulations, such as zoning, shoreline, and landmark designations. Answer these questions
if you can. If you have problems, the governmental agencies can assist you.
The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of time or on different parcels of
land. Attach any additional information that will help describe your proposal or its environmental effects. The agency to which you
submit this checklist may ask you to explain your answers or provide additional information reasonably related to determining if
there may be significant adverse impact.
Use of checkllafor nonprojectproposals.
Complete this checklist for nonproject proposals, even though questions may be answered "does not apply." IN ADDITION,
complete the SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS (part D).
For nonproject actions, the references in the checklist to the words "project," "applicant," and "property or site" should be read as
"proposer," and "affected geographic area," respectively.
A. BACKGROUND
1. Name of proposed project, if applicable: I AeUe -A �.*o -1
2. Name of applicant: 39VI�S/'
3. Address and phone nu mber of applicant and contact person:
("Y2-0 77 3 - Z/ 95,
2-3 5'2-!5* 9 Z/
4�QA-Jpql -3 5-5 - V 0 -P -R
Page I of 24
CHUT.DC01-NOV-93
MASMSPEA
4. Date checklist prepared: 71 2-,Q / o -.0
5. Agency requesting checklist: City of Edmonds.
6. Proposed timing or schedule (including phasing, if applicable):
&V'5-7t.-C-P-7 Q,— 7-0 Ac & 1-,o!o Aq- S' oa-7->
(STAFF COMMENTS)
7. Do you have any plans for future additions, expansion, or further activity related to or connected with this
proposal? If yes, explain.
' 'Ohaj-e-
OV= A;546-1-2-- lAeM
(STAFF COMMENTS)
8. List any environmental information you know about that has been prepared, or will be prepared, directly related
to this proposal.
(STAFF COMMENTS)
9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting
the property covered by your proposal? H yes, explain.
(STAFF COMMENTS)
Page 2 of 24
CHKUDOLAI-NOV-93
MASMR%PEA
0 0
10. List any government approvals or permits that will be needed for your proposal, if known.
(STAFF COMMENTS)
11. Give brief, complete description of your proposal, including the proposed uses and size of the project and site.
There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You
do not need to repeat those answers on this page.
A C�o
/ , 1< G Z"c �T4 AVQ,� 77a J 7-0 7�z,�
sc�J-'n L'or- Oz= a 77,61—f 1—r
1W 7;Y 4 5�> jg��,o 0,�c A;��r s rl,,-1 G 0��/
Ra 0 A e'r / L' (' Aaoi r? -2'-J CJ, C,(, *-IJ W—
AM—'4"'
(STAFF COMMENTS)
12. Location of the proposal. Give sufficient information for a person to understand the precise location of your
proposed project, including a street address, if any, and section, township, and range, if known. If a proposal
would occur over a range of area, provide range or boundaries of the site(s). Provide legal description, site plan,
vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the
agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related
to this checklist.
IVZ)
,!V*pc
C O.._n e.*_ 010 7* hkje_
(STAFF COMMENTS)
Page 3 of 24
CHKLTMWI-NOV-93
MASMR%1%A
TO BE COMPLETED BY APPLICANT
B. ENVIRONMENTAL ELEMENTS
1. Earth
a. General description of the site (circle onekLat,#lling, hilly, steep slopes, mountainous, other:
(STAFF COMMENTS)
b. What is the steepest slope on the site (approximate percent slope)?
(STAFF COMMENTS)
C. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? N you
know the classification of agricultural soils, specify them and note any prime farmland.
(STAFF COMMENTS)
d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe.
(STAFF COMMENTS)
Page 4 of 24
CHXLTDOMI-NOV-93
MASMSPEA
0 1 0
e. Describe the purpose, type and approximate quantities of any filling or grading proposed. Indicate source
of fill.
AA -z—
(STAFT COMMENTS)
E Could erosion occur as a result of clearing, construction, or use? 9 so, generally describe.
Ai ILI
(STAFF COMMENTS)
g. About what percent of the site will be covered with impervious surfaces after project construction (for
example, asphalt or buildings)?
0-rrf 3—, Z-
'P/f-V-25'1E—'0
(STAFF COMMENTS)
h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any:
Elk., 4iwx-e c,4i at-�, d�, AA C4.-.) -2--3 Co A)i -A s
(STAFF COMMENTS)
2. AIR
a. What types of emissions to the air would result from the proposal (i.e., dust, automobile, odors, industrial
wood smoke) during construction and when the project is completed? If any, generally describe and give
approximate quantities if known.
(STAFF COMMENTS)
Page 5 of 24
CWLT.DMI-NOV-93
MASTEMSPEA
0 9
b. Am there any off -site sources of emissions or odor that may effect your proposal? H so, generally describe.
(STAFF COMMENTS)
C. Proposed measures to reduce or control emissions or other impacts to the, K any:
A/ A
(STAFF COMMENTS)
3. WATER
a. Surface:
(1) Is there any surface water body on or in the immediate vicinity of the site (including year-round and
seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. N
appropriate, state what stream or river it flows into.
Al-0
(STAFF COMMENTS)
(2) Will the project require any work over, in, or adjacent to (within 200 feet) the described waters? If
yes, please describe and attach available plans.
(STAFF COMMENTS)
(3) Estimate the amount of fill and dredge material that would be placed in or removed from surface
water or wetlands and indicate the area of the site that would be affected. 1ndicate the source of fill
material.
&LA
(STAFF COMMENTS)
Page 6 of 24
CHUTDC01-NOV-93
MAMRNSPEA
9 0
(4) Will the proposal require surface water withdrawals or diversions? Give general description,
purpose, and approximate quantities if known.
/%', -0
(STAFF COMMENTS)
(5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan.
A/0
(STAFF COMMENTS)
(6) Does the proposal involve any discharges of waste materials to surface waters? ff, so,- describe the
type of waste and anticipated volume of discharge.
(STAFF COMMENTS)
b. Ground:
(1) Will ground water be withdrawn, or will water be discharged to ground water? Give
general description, purpose, and approximate quantities if known.
'4/1
(STAFF COMMENTS)
Pap 7 of 24
CHMM001-NOV-93
MASMR'SPEA
0 9
(2) Describe waste material that will be discharged into the ground from septic tanks or
other sources, if any (for example: Domestic sewage; industrial, containing the
following chemicals...; agricultural; etc.). Describe the general size of the system, the
number of. such systems, the number of houses to be served (if applicable), or the
number of animals or humans the system(s) are expected to serve.
(STAFF COMMENTS)
C. Water Runoff (including storm water):
(1) Describe the source of runoff (including storm water) and method of collection and
disposal, if any (include quantities, if known). Where will this water flow? Will this
water flow into other waters? If so, describe.
A, iy
(STAFF COMMENTS)
(2) Could waste materials enter ground or surface waters? H so, generally describe.
ljo--t- ax-de,
(STAFF COMMENTS)
d. Proposed measures to reduce or control surface, ground, and runoff water impacts, if any:
(STAFF COMMENTS)
Page 8 of 24
CHKLT.DMI-NOV-93
MASMSMA
0 0
4. Plants
a. Check q - circle types of vegetation found on the site:
deciduous tree: alder, maple, aspen, other.
t7 evergreen tree: fir, cedar, pine, other:
shrubs
7'
gram
pasture
crop or grain
wet soil plants: cattail, buttercup, bulrush, skunk cabbage, other:
water plants: water lily, eelgrass, milfoil, other.
other types of vegetation:
(STAFF COMMENTS)
b. What kind and amount of vegetation will be removed or altered?
Al� **� !!�� 3'-,***� per, s j
(STAFF COMMENTS)
C. List threatened or endangered species known to be on or near the site.
(STAFF COMMENTS)
Page 9 of 24
CHKLTDMI.NOV-93
MASERNSMA
0 9
d. Proposed landscaping, use of native plants, or other materials to preserve or enhance vegetation on the
site, if any:
. i-I rf
(STAFF COMMENTS)
5. Animals
a. Check or circle any birds and animals which have been observed on or near the site or are known to be on
or near the site:
birds: hawk, heron, eagle, songbirds, other:
mammals: deer, bear, elk, beaver, other.
fish: bass, salmon, trout, herring, shellfish, other:
(STAFF COMMENTS)
b. List any threatened or endangered species known to be on or near the site.
(STAFF COMMENTS)
C. Is the site part of a migration route? If so, explain.
— A-10
(STAFF COMMENTS)
Page 10 of 24
CHXLT.D=I-NOV-93
MASMSPEA
0 0
d. Proposed measures to preserve or enhance wildlife, if any:
(STAFF COMMENTS)
6. Energy and Natural Resources
a. What kinds of energy (electric, natural gas, oil, wood stove, solar) wiH be used to meet the completed
project's energy needs? Describe whether it will be used for heating, manufacturing, etc.
Alo CY4-a 4?40C S,--VY <21-1 --,J 12W:h ;31--2
(STAFF COMMENTS)
b. Would your project affect the potential use of solar energy by adjacent properties? If soo 'generally
describe.
AJo
(STAFF COMMENTS)
C. What kinds of energy conservation features are included in the plans of this proposal? List other proposed
measures to reduce or control energy impacts, if any:
AYA
(STAFF COMMENTS)
Page I I of 24
CHUT.D001-NOV-93
MAMMSPEA
0, 0
7. Environmental Health
a. Arc there any environmental health hazards, including exposure to toxic chemicals, risk of fire and
explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so describe.
(STAFF COMMENTS)
(1) Describe special emergency services that might be required.
(STAFF COMMENTS)
(2) Proposed measures 10 reduce or control environmental health hazards, if any:
(STAFF COMMENTS)
b. Noise
(1) What types of noise ' exist in the area which may affect your project (for example: traffic,
equipment, operation, other)?
TRO-0�,c ad4edAs Rar 15=' ;57OOf7L A/07- Ar- AC,>gkX,1*
(STAFF COMMENTS)
Page 12 of 24
CHKLT.D0C%I-N0V-93
MASTFR%PEA I
0 0
(2) What types and levels of noise would be created by or associated with the project on a short-term or
a long-term basis (for example: traffic, construction, operation, other)? Indicate what hours noise
would come from the site.
ec>^s 4A '4-e 5"
100 �J4'—
(STAFF COMMENTS)
(3) Proposed measures to reduce or control noise impacts, if any:
A-1
(STAFF COMMENTS)
S. Land and Shoreline Use
a. What is the current use of the site and adjacent properties?
Z 21D
SL-X.-7-�-f z ou r"
70- /,u< 3,7
42 / -)-a /ZCJ
2�z
(STAFF COMMENTS)
b. Has the site been used for agriculture? If so, describe.
,AJO
(STAFF COMMENTS)
Page 13 of 24
CHUT.D001-NOV-93
MASMSPEA
0 0
C. Describe any structures on the site.
(STAFF COMMENTS)
d. Will any structures be demolished? If so, what?
Ald
(STAFF COMMENTS)
e. What is the current zoning cl sification of the site?
f,/7 qova,41
(STAFF COMMENTS)
E What is the current comprehensive plan designation of the site?
(STAFF COMMENTS)
g. If applicable, what is the current shoreline master plan designation of the site?
(STAFF COMMENTS)
Pap 14 of 24
CHKLT.DOC%I-NOV-93
MASMRNSPFA
h. Has any part of the site been classified as an "environmentally sensitive" area? H so, specify.
J
(STAFF COMMENTS)
L Approximately how many people would reside or work in the completed project?
(STAFF COMMENTS)
j. Approximately how many people would the completed project displace?
0
(STAFF COMMENTS)
k. Proposed measures, to avoid or reduce displacement impacts, if any:
(STAFF COMMENTS)
Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if
any:
(STAFF COMMENTS)
Page 15 of 24
CHUTDOCU-NOV-93
MASTYRNSPEA
0 . 0
9. Housing
a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low-income
housing. 4
(STAFF COMMENTS)
b. Approximately how many units, if any would be eliminated? Indicate whether high, middle, or low-
income housing.
AM
(STAFF COMMENTS)
c. Proposed measures to reduce or control housing impacts, if any:
. - 6KI-A
(STAFF COMMENTS)
10. Aesthetics
a. What is the tallest height of any proposed structure(s), not including antennas; what is the principle
exterior building material(s) proposed?
A2PY-na� 11- ri_A?-r fz- /4 A-&�Q,.nr
1--Jo-az> Fr2--� 6Cbev S 07 Z-4 C-97--"'/
(STAFF COMMENTS)
Page 16 of 24
CHKLT.DWI-NOV-93
MASTERNISMA
0 0
b. What views in the immediate vicinity would be altered or obstructed?
(STAFF COMMENTS)
C. Proposed measures to reduce or control aesthetic impacts, if any:
!nf L-;e c-o fZ
(STAFF COMMENTS)
11. Light and Glare
a. What type of light or glare will the proposal produce? What time of day would it mainly occur?
A4ZA
(STAFF COMMENTS)
b. Could light or glare from the finished project be a safety hazard or interfere with views?
Az6
(STAFF COMMENTS)
C. What existing off -site sources of light or glare may affect your proposal?
-A4&
(STAFF COMMENTS)
Par 17 of 24
CMT.D=I-NOV-93
MASMSPEA
d. Proposed measures to reduce or control light and glare impacts, if any:
I
(STAFF COMMENTS)
12. Recreation
a. What designated and informal recreational opportunities are in the immediate vicinity?
(STAFF COMMENTS)
b. Would the proposed project displace -any existing recreation uses? If so, describe.
/VJ
(STAFF COMMENTS)
C. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be
provided by the project or applicant, if any:
(STAFF COMMENTS)
Page 19 of 24
CHKLTDWI-NOV-93
MASMR%SPEA
0 0
13. Historic and Cultural Preservation .
a. Are there any places or objects listed on, or proposed for, national, state, or local preservation registers
known to be on or next to the s ite? H so, generally describe.
(STAFF COMMENTS)
b. Generally describe any landmarks or evidence of historic, archaeological, scientific, or cultural
importance known to be on or next to the site.
(STAFF COMMENTS)
C.. Proposed measures to reduce or control impacts, if any:
(STAFF COMMENTS)
14. Transportation
a. Identify public streets and highways serving the site, and describe proposed access to the existing street
system. Show on site plans, if any.
Zr5
2-3 6 `* 5-r- 5- i-of
(STAFF COMMENTS)
Page 19 of 24
CHKLTDOLU-NOV-93
MASTERWEA -
b. Is site currently served by public transit? If no, what is the approximate distance to the nearest transit
stop?
(STAFF COMMENTS)
C. How many parking spaces would the completed project have? How many would the project eliminate?
C3 e-44
(STAFF COMMENTS)
d. Will the proposal require any new roads. or streets, or improvements to existing roads or streets, not
including driveways? If so, generally describe (indicate whether public or private).
(STAFF COMMENTS)
e. Will the project use (or occur in the immediate vicinity of) water, rail, or air transportation? If so,
generally describe.
(STAFF COMMENTS)
Page 20 of 24
CHKLT.D=I-NOV-93
MAMR%PEA
How many vehicular trips per day would be generated by the completed project? If known, indicate when
peak volumes would occur.
(STAFF COMMENTS)
g. Proposed measures to reduce or control transportation impacts, if any:
(STAFF COMMENTS)
15. Public Services
a. Would the project result in an increased need for public services (for example: fire protection, police
protection, health care, schools, other)? If so, generally describe.
A10
(STAFF COMMENTS)
b. Proposed measures to reduce or cpntrol direct impacts on public services, if any:
(STAFF COMMENTS)
Page 21 of 24
CHKLT.D=I-NOV-93-
MASMRWF.A
16. Utilities
a. C' currently available at the
cn!!9-5�r, septic system, other.
(STAFF COMMENTS)
b. Describe the utilities that are proposed for the project, the utility providing the service, and the general
construction activities on the site or in the immediate vicinity which might be needed.
-& f A
(STAFF COMMENTS)
C. SIGNATURE
The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relying on them to
make its decision.
Signature of Proponent
Date Submitted
cHUTDMI-NOV-0
MAMR%HA
Page 22 of 24
D. SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS
(do not use this sheetfor project actions)
Because these questions are very general, it may be helpful to -read them in conjunction with the list of the elements of the
environment.
When answering these questions, be aware of the extent the proposal, or the types of activities likely to result from the
proposal, would affect the item at a greater intensity or at a faster rate than if the proposal were not implemented. Respond
briefly and in general terms.
1. How would the proposal be likely to increase discharge to water; emissions to air, production, storage, or release of
toxic or hazardous substances; or production of noise?
Proposal measures to avoid or reduce such increases are:
2. How would the proposal be likely to affect plants, animals, fish, or marine life?
Proposed measures to protect or conserve plants, animals, fish, or marine life are:
3. How would the proposal be likely to deplete energy or natural resources?
Proposed measures to protect or conserve energy and natural resources are:
Page 23 of 24
CHUT.DMI-NOV-93
MASMR%PEA
4. How would the proposal be likely to use or affect environmentally sensitive areas or areas designated (or eligible or
under study) for governmental protection; such as parks, wilderness, wild and scenic rivers, threatened or endangered
species habitat, historic or cultural sites, wetlands, floodplains, or prime farmlands?
Proposed measures to protect such resources or to avoid or reduce impacts are:
5. How would the proposal be likely to affect land and shoreline use, including whether it would allow or encourage land
or shoreline uses incompatible with existing plans?
Proposed measures to avoid or reduce shoreline and land use impacts are:
6. How would the proposal be likely to increase demands on transportation or public services and utilities?
Proposed measures to reduce or respond to such demand(s) are:
7. Identify, if possible, whether the proposal may conflict with local, state, or federal laws or requirements for the
protection of the environment
Page 24 of 24
CHKLT.DOC\I-NOV-93
MASTER\SPFA
.. - j�"' 0
MEMORANDUM
Date: April 8, 2002
To: File Building Permit BP-2001-0282 and
�q�*_23525 —84h.-Avenue-'-!'�
From: Meg Gruwell, Senior Planner
Subject: Parking for Christ Evangelical Lutheran Church
In the staff report for the Christ Evangelical Lutheran Church proposed addition and revisions,
constructed under building permit # 2001-0282, 1 calculated parking requirements as follows:
As stated in the earlier staff report, the parking requirement for churches is one
space per four seats or one space per 40 square feet of assembly area, whichever
is greater. The C.E.L.C. has 3000 square feet of sanctuary, which divided by 40
yields a requirement of 75 parking spaces. They also have 192 pew seats, which
divided by four, would only require 48 parking spaces.' Because the requirement
is the larger of the two, we require 75 parking spaces. According to the original
site plan submitted, the west parking lot has 49 spaces, the north parking lot has
16 spaces, and the south parking lot had 11 spaces, but four of those were being
removed for the addition. The total of all the remaining stalls is 72 spaces.
Because the proposed addition* is not changing the assembly area or adding pews,
the parking requirement will not change.
I have since been provided with a more accurate measurement of the sanctuary (attached), which
shows that the area of the sanctuary, excluding the entry is 2888.5 square feet. Because the entry
is a separate space, and although perhaps suitable for overflow viewing of the service, not
constructed for, regular use as a sanctuary, it is acceptable to exclude it from calculations. Based
on the new measurements, the requirement for parking spaces is 2888.5 divided by 40 equals
72.2 or 72 parking spaces. As noted above, they have at least 72 parking spaces at present, so no
new spaces will be required.
City of Edmonds c�R Community Services
12
23
12
59.5
29.5
23 4 92.00 11.5 29.5 339.25
59.5 47 2796.50
2888.50 2888.5 40 72.2125 parking stalls
RECEIVED
MA R 5
PERMIT COUN-T -
lei
rub
ui
.j
z
ul
0
?3
LL
15
0
I**
OCCUPANC Y AAS
CONSTRUCTION = V-N
SITE AREA 0- 1851373 SF
EXISTING BUILDING -AREA 1399,95 GSF
PROPOSED ADDITION OWN" 29313 GSF f
0
TOTA."L4MOPOSED
COMMERCIAL USE
SITE PLAN
ill = 20'
3000 SF SANCTUARY / 40 = 75 PARKING SPACES REQ'D.
192 PEW SEATS /
NORTH 4 = 48 PARKING SIPACES REQ'D.
THEREFORE: 75 PARKING SPACES REQUIRED.
EXISTING PARKING = 75 SPACES
-23525 84th Ave-. W.
Edmonds, WA 98026
I Lutneran Church
C)
00
I
c1_1
"Izt
N-.011
Z
jr
Any nquat W modgkAdont VA&Ace or Othe
,r
*dmiubtMOV6 dOviAdOn- 06reinafter "vadaacO)
must b6 SPCIS"MY CaRed out and identified.
APPrOvAl 'Of Any, -plat or plan containing
nmvialane whffth Aft
EXIST11
10,011,111 i i i W iiiiiii5 0001 1 limm
Row W"Aptly WRAI city coue PORAM,91
and for which it v.gdsjjkc6 has not been
STOM4,
SpftirlaAy identifiedi requested and considered. ILDING
� W
by the. appapriate, citr offleW in accordsine
e
C
V
with the aPPrOPriatt Provision of dty code. or *
BC
state. law does not approve any item not to code 97 1 #NJ rigg'a
specirleation.
BARRIER FREE
PAR ING SIGN 112.42-
-APPROVEDWAANNING
REA
OTHE
HEIGHT
doodadidooll
------ TE,
lip
8XISTINO NORTH PARKING LOT
PAFNNG SPA0312- a
FIRE
9XISTNO LOG BARRICADE
1 -0 hod -dill 1.4-�*- 16 SPACES
HYDRANT.
*V?
IZZ= PARKNO VAM
LEM
a
(4) -OUPRESSOCYPARIS MOM
SMAIM FM PAN
ILEYI.ANDILI (CONIFERS)
10 PTI HEIGHT) ol
�*ZYWTINQ CATCH SASN JI I
I CITY OF- EC N60NIMS
do
FPAf IKIN (S 0*026
W wwre PAINT 'AAW M MW BUILDING DEPARTIASNT
STMPI!, Typ. SARRMR FREE' WORK
PARKING SIC, N
AD S�
OWNER
kid
EXISTINQ MCH SAOIN"I'm APPROVED' DATE!-
BLDG. OFFICIAL 0.
7
PERMIT NL�ty
E=MNG RAMP
J
XISTING WEST, PARKING LOT
E
49 SPACES 47 EXISTING ONURC)i a?
00*OV*AWOWYAW SUILDING HEIGHT CALCULA710N
A i a, MM h wi0100010ww IN -4 111101004001
ov 0
J` a 'CORNER A IEL. 1031-6
CS IN l
CORNER 8 EL.
'EL. 106'-011
"Nodoolaidooloodoolood"al"
CORNER C
Jolool 0*0 Will . "M "M a" am MO No 'owe -Wow owsor, *"w 400 040 oft will iCORNER-D EL. 102'4!
ROPO -1 N
4� EXISTING SPA Cf.$ I - $VRY ADDITIO
P SED-1
ovp I
WILL ae Ram -D
to Im *TOTAL. 416'aaft", 111 +4 41.
Ila
�vpw^oamft& aw"'doo--io."
4 +
(10) - THU. JA A00.101"NTAPS 1� il pit (I rHUJA ACCIDENTAUS ALLOWABLE BUILDING HEIGHT 261
`P"AM -
IDALIV. (SW 10 LOADING AR6A Ft kMIDAUV (Id')"RUSS)
HEI4HT:
MAXIMUM ALLOWABLE BUILOINO
FENCED
dodoo,
1. 1
PLAY - 0
PROPOSED.N5%
do gxli�nwi 80#* PAMN41 J-0T PROOOSED MAXIMUM BUILDING LEVATIOM
AREA
=RMWAT9R
'C 0. ON
SPA SS
DETENTION SYS
rez-
18004 *ntton Ipe. 03 If
p
loop
Lgo
;1p
U FALL
PROPERTY -LINE- iddawailloodoodo'.0odpoom o*mwe. 4aiddloodd do;kodlvoo voldood, age dit 0 Ir
1010� " I
***Now 000*mo*p."w .
dpo;. 4--
go. ==
lood, do ftwimpoin,00000 woodivivio. "dod000". dowilovid
lopol000l,
p to
Ala IFF01 - MOM I ok
"**am
Poo W 6"000
13ENCHMARK: --il—M vk�
-fop OF WsTING 08 236TH O`TL, SW .2 Osl 4
i -a . .....
a- h
0 AS$#JMIa1>ELF.VAf ION 10 m 42.
0 MONOW
N a.
COMMERCIAL USE -------
A r-WOVED BY ENGINEERING d,
m000 sF SANCTUARY IV. it C V, I v Z 0
Owl" 4-0 75 WtKING SPAC9$ RE9�0. REC IVED
�1/70 := -I solo
NNW"
4
'E A
MCA 72 MARI 2001
sr�4w w MAP 0 2601
VVELOPMgNT-URV
CItY OF EDMO
1192 PEW SEA
1zx10 i NG SU'"IM" N -6, *REA 9 IGISF N. NO 4 48 PARKING SPACES REO'D. PER COUNTER
MIT
OA*Ae
UPA
EAVORE- 76 PAIRKIM WAOSS RMURED41
Now
Pmvrostb ADDIMON S - T - E: PL A'N, !rH
JUN — 4. 2001
%01t0N,-, VON 'A 10 2.01
Ir
0-Sr"
C ON P"w0"mOSED AREA A-W 16,308' M(MTINQ PARKING 76 SPACES 'BUIL
TOTAL DING DEPT.
tt too.
�j 7r--
ilod''.. -on.,
NOTE:
IMPROVEMENTS NOTE:
KITCHEN
MOCHANICA1. IiVAC $HALL
'WILL ran
BE-COVERSO ChrAs hg,
T SE UNDER SEPARATI� PERMIT01 Addftlo n* to Ena 0661 - L.
QNDSR SF-PARAT15 PERM
0
M
IL
30
W —1
C- 3:
2
U-1
LO OD
C\I
04 M C
4-j 0
z
co
20' 3
-4
Existing Cased Monument
1, 1
ri
N 88* 02'04 " E
6 3 5.70'
C E
i Sty. I
IF M I
L Idl, -7
41
-EE 4
W P
W P
One Story
Frame Bldg.
L
Co.1c. Wa I k .1vp ,
a ito
C-Eave Line (Typ-JI-- j
1 story Brick venl?er' New One Story Frame
Building with Basrnnt. Add i't i on +
e-vr-i yi-%hilt- I A I/ r- h A
A I r:"r:"r rp A '"i"c"
I rZ . A r- ) r - - \ 1% 1 Z)
I V I % L L7- L- 1% --) /-\ I"% i7- I 1'� /
CE
G 3 5.4 G',.A
-7
0
C\I
C%I
-0
Tx i ;t—i n F -8 1 —S a—n I Cc 7 ; —S ; 7-jr Ex. 8" San. Sewer M-i 0
G'C5-441
86*03'35" E '1'�Existing Cased Monument
0 236th. Street S. W.
4" Steel Waterline w w W W -7- W
Al
0 = INSTALLED IRON Fit -.BAR WITH PLASTIC CAP No'd. 45GI
M-i= SEWER MANHOLE
CE= CONCRETE ENTRY
WP= WOODEN PORCH
LEGAL DESCRIPTION
VACATED PLAT OF LOTUS LANEPACCORDING TO THE PLAT THEREOF
RECORDED IN VOLUME 15 OF PLATS� ON PAGE 72, RECORDS OF SNO-
HOMISH COUNTY) WASHINGTON;
TOGETHER WITH GO FT. RIGHT OF WAY KNOWN AS LOTUS LANE ON
SAID PLAT) EXCEPTING ANY PORTION OF 84TH. AVENUE WEST AS
DEDICATED ON SAID PLAT.
14
PLAT OF SURVEY
FOR
CHRIST LUTHERAN CHURCH,
EDMONDS., WASHINGTON
Added NewAddition and Relocated Small Building 12-10-74 G.W. L..
RECEIVED
ENGINEERS* SURVEYORS* PLANNERS
APR 11 2001 324 MAIN STREET. EDMONDS, WASHINGTON
PERMIT COUNTER DRAWN CHECKED - FIELD BOOK I SCALE, '50, FILE NO. 4620.
- 1 -74 357, p-25
G. W. L 7 DATE 1 .1 SHEET OF
F
llam�. -
A;%
3. V k .1
. . . . . . lcj! .11
.4
v
PSRTY IN)a
AxW requast for modilleAflon, yArbilce or other
v I A.
lip I 11111, hill.1 11,11 111110111,11 A ISO
must be spolfiony egied out and identified. EF UPTIVE
Approval 'of stay. plat or plan containing EXISTO
FFe
vrovWonx whIc4 do not ow ly wl+16 %v* A I ^
and for which
wirlstace has not been $T0 M."'wa
sPecirleWly identifiej; requested sind considered. :BUILDING
by the. appropriAte city of P.A.
ficiAl in stecordAnce
with the appropriate provision of city code. or 97 Usc ",P
state lAw does not approve gny item not tocode 1141 T
14,
IVE
speeirlication.
ETBACKS:
BARRIER FREE
PAR ING SIGN FrIONT a 411:4
SIDE. 4 -APPROVED V 0LANNIh 0
REAR
10
OTHE
HEIGH 1
iggid NIAN !01!
PWING SPAM Mkom o :2
SMSTING NORTH PARKING LOT 1111 1 boll
EXI$lr.NG- LOO BARRICADE
16 SPACES FRrz
hYDRANT-
PARIQNG SPACES 11111,11 UNION It
v MUM iw;
V
(4) -OUPRESSOOYPAR18 WRIER FREE FARM 1
ILEYLANDIV (OONIFORS)
(a 1 o FT. HEIGHT) MOSTING OATaH VIA10114 CITY OF- EC [00NDS
13UILDING DEFIARTNISN"i
'AZW j7) NeW 11ASKINS 0PA11513
40 WHITE PAINT
STRIPE, TYP. BARRISR FRE E WOrAK
PARKING SION
19UT
01 ADDRESS
OWN r: rl 1_7)tyK-,A
L
EXISTINQ MCH APPROVED' DATE::
BLDG. OFFICIAL 0
At 1;6
PERMIT
EXISTING RAMP"'i'v_..
EXISTING WEST,. PARKING LOT
49 SPACES EXISTING CHURC)i
4. 011"1110 1
BUILDING HEIGHT CALCULATION
0/
'CORNER A 11. 1OW-6
COANER 13 F.L6_105'#0',l_
W. COANER 0 -F.L. 10610-011
L WM lift iCORNER-D EL, 102!-61.1.
4� EXISTING VACE$
PROPOSED 1 STORY ADIDIT16
WILL SIF. f =I, OVED TOTAL. 4 1 V-01', + ELO J�k,%.V
---------- -A
+
lei 26t
A ALLOWABLE BUILDING HEIGHT
(10)'THI)JA ACCIOENTALM (i rHUJA ACCIDENT -US
R, NMIDA
.1PYI�AMIDAQW. (SH LOADING1,ARSA' LIW- (It HRUSS)
r MAXIMUM ALLOWABLE BUILDING HEIOHT:.
PENCED
roz 001.7/ 44,
PLAY 00AMA sm MIMM b ^6^6Mn RA A VIALA U 91"11 M it 9 1 CVA*rlf%Llb
AROA F-XI AMA vwp rTl rp^NM, 4A wl w� d
il Pill SMRMWATER
AWN* IOSS
III, SPA
0 DETENTION SYSTEM
pipe. 03 If
Is" 0 d
011 .w no C
P I On!
tlaq no OULFA,41�
F4-
7ROPERTY 'LINE- --------- 'a ditch
Iiii %W 44*P W 0*1100111111OV)P NOPOWAA" 40
.0.00
X aw w k ok, .4
--I 1 1111, 01 4 io -
1 0 - - - lwowwk 4,46" Vol SAM, 011-1i M 0
01 i i ;::illw
0100 "wowwo
13EN(DHMARK' .
TOP of: Exl$lrIl4QC8 -0 4
236TH SW - --- ---
ION 10 0144 4"111/ .0 -44 19 NAP 0
0
og*
0,4 . ON-
lb— 0 -1 h i OWN
?
M W.—dIll. 016 _FA 0 -4 NA-0 ww
poll-, UN1,11,11,
COMMERCIAL US15
Ar-MOVED By EN13INEERING
Moo SF SANCTUARY
4-o 718 PA*kKIKQ SPACES RgqD, Re IVED
OWN"
t: 1815A`73 ;Jof MA 2601 MAR 1
SIT` Av%= owow 0/ DOELOPMENT-99 Ott
kow, Mr.& amm mom F a Do
^11'riliklu 5 ~ �5 1192 PEW SEATS CITY OF
4 48 PARKING SPA,059 REO'D. PERMIT 60UNT.En
Ex NORA'
'"UILDIN -0, -AREA ad F115CEIVED!
"CuPANCY AZ 4
2 313 G SF S- I - T, E PL- A -� N tHEREFORE.- 76 PAAKM SPACM MkWAEDO
JUN - 4.2001
PROPOS=0 ADDIMOH 'S 844"t.h. AVO
00 -23 2
r `0 =-A --, I t$ r in 2.01 040 PARKING 75 SPACES DEPT.
%;0N, STRUCTtgN VN * rom A ..*"
;5= AR
TOTAL v%ROPO'*&u
E
401jondSki VA""
NOTEI
NOTE!'
KITC46 IMPROV61VIENTs
VILL Be-COVER151) T,
A4
a-
-MECHANICAL H dift"o, Cot -an C n.
Ad A .,,L. N
-jam
VAC VALL; n to Chr En .1i"
MIT DE UNDER SgpARAlr5'PEAMIT0
UNDER SEPARATE PER
PROPMTY I IMF
10 20
W-7171.1FIXT,
A P PRO" V. E D- B Y P L N I G
6020300167
Zone e� I Lg" I- S- Comer'f— Flag_
AN I)
Setbacks Required Actual
Front
Sides
Rear
Other
Ifeip �5-
,ht
JILU11W 11LIV2111 %jr%L1jvLr%11v11
ORNER A EL 103'-6-
ORNER B EL 105'-0"
DRNER C EL 105'-0"
ORNER D EL 102'-6*
)TAL 416'-0* + 4 EL 104'—
BUILDING HEIGHT + 25'
AXIMUM ALLOWABLE BUILDING HEIGHT EL 129'—
ROPOSED MAXIMUM I BUILDING ELEVATION EL 125'—
PROJECT SITE
R PRE 8 U B
. OCT 18 2013
BUILDING DEPAR7,AEN1
CITY OF EDNIONDS
1ENGINISERING
250 4TH AVE. S., SUITE 200
EDMONDS, WASHINGTON 98020
PHONE (425) 778-8500
FAX (425) 778-5536
10/11/15
<
r-
z
0
m
M
Ej
ce-
1--
LLJ
w
Q
LLJ
5
w
C)
0)
C:)
C:)
V
DESIGN:
Cmi
DRAWN:
JCS
CHECK:
CCC
JOB NO:
13120.10
DATE:
09/03/13
—j
LLJ
0
0
:m
Ld
w
r
0
V)
LLJ
to
z
<
0
cl�
LLJ
00
LLJ
>
0)
r
<
<
CK)
tn
a
Z
LO,
Z
0
N
0
Lo
LLj
04
LLj
SHEET:
PrA
01