Loading...
23602 105TH PL W.PDFlill lill 11 325 23602 105TH PL W PLANNINGDATA =F SINGLE FAMILY RESIDENTIAL Name: Date: Ll - 3 Site Address: 05- TaxParcel op36qo0ptq)qoo Project Description: Oe,--j �5 Plan Check #: Reduced Site Plan Provided: (G) NO) Zoning: '16 Map Page: Corner Lot: (YES Flag Lot: (YES Critical Areas Determination #! (-RA7%9qY eg tl " V,- KrStudy Required Armte"5e-) FPO El waiver .SEPA Determination: YV\VP5 El Exempt Needed (for over 500 cubic yards of grading) 0 Fee 0 Checklist 0 APO List with notarized form Required Setbachs Street: Side: -7 1 Side: Rear: Actual Setbacks Street: icle: Side: -7 "-L- El Detached structures: 11 Rockedes: El Fences/Trellises: Bay Windows/Projecting Modulation: El Stairs/Deck: Height Datum Point: I;J: F Datum Elevation: Maximum Height Allowed:* 9-5— 5-3) Actual Height: Offief Parking Required: Parking Provided: Lot Area: �3 Ma . ximum Lot Coverage: 35% Proposed: 2z) role Lot Coverage Calculations. ADU Created: (YES /R) Subdivision: T--�-00-7 -(2 P12 �i �,?-OcQ -I t2b Legal Nonconforming Land Use beterminationLIssued: (YES / NO) Comments k e, 0 11JQ_ Plan Review By: Ptanning Data Form 07-14-09.doc LANNING 0 New Horizons Landscape Design & Installation Woodvale - Lot 4 12003 184th Ave, NE For Burnst6ad Co. .10'-0" Redmond, WA 98052 9.18.2015 a 0 0 SU SET MAPLE FLOWERING PLUM FLOWERING PEAR CORALBARK MAPLE FLOWERING DOGWOOD x (PINK) VANDERWOLF PINE FOUNTAIN GRASS PIERIS RHODODENDRON PJM RHODO. OTTO LAUREL REDTWIG DOGWOOD VIBURNUM DAVIDI 0 AZALEA 0 BLUE FESCUE FERN COBBLESTONE WEST. RED CEDAR R RHODODENDRON Vo EV. HUCKLEBERRY REDTWIG DOGWOOD N 105��4 f=Z W 3,336 SF z TER FABRIC FEN x x 6 0. 00' SRA m N88037'( 25' — — — — — — — -- 63.Sl 20' WATER/SEWER EASEMENT ROC ONS CTIJN EN ANCE 5/w 2 5 OVRE51DEN 240 XREDEN 5 5 M,A4 L= 3219' �Ll I CNI- 3 7,390 SF x Iv - - -p -I- X-X-x x 6,320 SF 60.00 60.00' 321' L-i\,-,-,-h\JEERIN(� DIVISION A? -PR D S I\JOTFQ , /,gVff D 4 Date: �21 lo in NOTE5: • LOT WAS BEEN CLEARED AND GRADED PURM PLAT DEVELOFMW PROCESS MAX SLOPE ON SITE IS I N IM OR APPROX *1% ARROWS MiCATE DIRECTION OF SLOPE. NO SIGNIFICANT GRADW-v REQV. • EXCESS FILL 15 TO BE REMOVED FR011 SITE. • DCUNSPOUTS ARE TO POSITIVE PRAIN INTO PLAT STOR1 DRAN LNES. • DIRIVEWAY WAS A I MSE IN 32 own dwffi� RLIN OR 3% SLOPE. JVDIRT, "Z, ROM OR DIEBRIS SI-ALL BE C:CllZD TIME SITE TO Tw STREET T47 IS I HEET FIL W40 TO FILTER FAMC RECElVEDmA,7clE0m,N S`P0cUt`ST0T`BCT'oW"-LlNED W1 SOLID OPIPE OF APPROVED MATERIAL TO CATC14 BASIN THEN DRYWELL TO T14E STOR1 STO PROvVW 9 FRONT OF LOT ALL STORI WATER TO BE R=ED TO EXISITINGA STOF;M SYSTIRI LINE LOCATED FEB 112015 ON V5TH FL W, DEVELOPMENT SERVlGlZ=LsA= cN RN03A.0524MACDEISK231TI4 PIL W TITLE: BURNSTEAD CONSTRUCTION LLC N IIATE: 01/2645 1 DRUN BY: J HERR W001DVALE LOT 4 11980 N.E. 24th ST. (]F� 23602 105TH Ft WE5T EFR0510N CONTROL BELLEVUE, WA 98005 K:J7 SCALE: P=20' (425) 454-1900 Parcel xxxxxx of EDAf >____;kO, V City of Edmonds RECEIVEP, Site Classification Worksheet FEB 112015 WO O-C) V il� _,T��rRT SERVIC,E OUN Page 1 of 2 TER "7 IS911 The project's Site Classification will dictate the specific stormwater management requirements applicable to your site. Completing this worksheet will help determine the amount of regulated impervious surface and whether your project falls into the classification of a Small Site (Category I or Category 2), or a Minor Site. Please reference the Glossary (pp. 10- 11), Figures D and E, (pp. 8-9), and Examples (pp. 11-12), to assist with completion of this worksheet. 1) Is Permeable Pavement' Proposed For Use on this Site? [:1 Yes E] No Refer to Stormwater Supplement Chapter 5.1 If YES, the subject area is to be considered impervious for initial site classification purposes. Include total permeable pavement area in the calculation of Non -Regulated, Replaced and/or New impervious surface areas in the table below. 2) Determine the Amount and Type of Existing & Proposed Impervious Surface for the Site Refer to Storinwater Supplement Chapter 2 and Fig. C Line 1: Identify the Non -Regulated Impervious Surface Area. Line 2: Identify the Replaced Impervious Surface Area, dividing the total between Exempt and Regulated; either or both may be zero. Note: For project classification purposes, Replaced Impervious may only be considered exempt under certain conditions. Refer to the Glossary and Figure D. Line 3: Identify the New Impervious Surface Area for your project. All impervious areas created post -July 7, 1977 or after the date of annexation into the City are regulated & should be included in this total unless they can be categorized separately as a Replaced -Regulated area. Line 4: Enter the sum of the total Replaced -Regulated plus the total New impervious areas. Line 5: Identify the total area currently mitigated by an existing city -approved stormwater management system. Line 6: Enter the sum of the value in Line 4 less the value in Line 5 to identify the total Regulated area in which stormwater controls have not yet been applied. Line 7: Identify the total area proposed to be mitigated through the use of Low Impact Development Techniques. Line 8: Identify the total area proposed to be mitigated through conventional Stormwater Management Techniques. ** Provide a copy of the following table on the drainage plan sheet for the proposed project ** Line I Area (square feet) 1. Exempt Regulated 2. eplaced New (Post 1977) + 1 Total Regulated Impervious Area j Mitigation required if in excess of 2000sf 01194a 3 3. 4. 5. 6. Total Area Mitigated by Existing Stormwater Management System(s) Regulated Area Not Yet Mitigated 7. Area Proposed to be Mitigated by Low Impact Development Techniques cK_U 8. Area Proposed to be Mitigated through Conventional SWM Techniques !9 I (e.g. porous asphalt, porous concrete, paver blocks, concrete open celled paving grids, or plastic lattices filled with turf or stone) Revised on 310512012 E72-S"IAI—Ei-osioii—Coiiti-ol-03.05.12.doc Page 5 of 12 'RW,;LO15'-016,—f ROOF DOWNSPOUT 4-FOOT DlAME7*ER HOUSE /7 CA TCH HOLE FILLED NTH SIN 1. 112* -3" WASHED (YARD DRAIN ROCK DRAIN) 4" PVC OVrRFL6W 00L FLOW TO BE CONNE07ED DOWONSPOUT TO Lor-sionu DRAim CLEANOUr FLANVIEW, WAw Nor To scALE ROOF - 4" Pvc OBSERVA 77 WLL DOwspour Co NSIR Or _IMSH.To FN HEDUCRArD ROW/ - , HOUSE OVERFI:OW PROP LINE - SPLASH <0 .%bgv— V% vi 10, BL It. FLOW MIN 4 PIA. SH FINE ME L -7-- PVC PIPE 9A bi (YARD DRAIN) M TH - FX TER FABRIC rl TO LOT STORM DRAIN CLEANOUT FOOTDIAUMR SECTION -POL—MILL M TH -TA414. -I'ABOVE 1 112" -.30 WASHED NOT tO �CALE DRAIN ROCK SEASONAL HIGH GROUND KA 7ER TABLE DRY WELL'DETAIL. NOT 70 SCALE I.. DR y WELL. S yS 7Eq 15 REQUIRED To BE INS TA dED ON EA CH L 0 T 2. ROOF DRAIN LINE FROM EACH BUILDING TO BE CONNECTED TO -DRY KELL S�67EM. OvERFLOW LINE TO BE CONNECIED TO LOT STORUDRAIN CL.kANOUT J. DRY BELLS 70 BE INSTALLED A T .77ME OF BUILDING- C0N§7RUC7lON,. 2013. 114,DWIVAL. LOT RECEIVED' (wymm ww" lgw�wwiwq M-T) 2015 DEVELOPMENT SERVICES COUNTER Sto 9015- 0 Ito cj 5 5,336 SF" , b x Q ry x r-n nn, 32T FIMPERVIOU5 5URFACE GALC5 FESIDENCE WIT14 EAYES 2363 WALKS AND LANDING$ 95 DRIYEWAY 42D TOTAL. NEW IMPERVIOUS 2SS3 STRUCTURAL LOT COVERAGE FRESIDENCE/GARAGE las COVERED PORC44 191 TOTAL F/P 60 FT Im STRJCTURAL LOT COVERACIE X 31% F40M COMLAM Comista or all @WmWA covwed bg thm av4d"Is we Ord WA'dm dk"wed cn " PIK 981 "m hm IVERYOZ -w. oil =, =,.=--*d www", d*iw-% Poo oveftNo, wk w!p, .:52 Lt;" LL r)c)) 63-31' 20' WATER/SEWER EASEMENT 3 7,390 SF K IQ Q-Z -7'nO"% A/ NOTES: • LOT WAS BEEN CLEARED AND GRADED DURING PLAT DEYELOPMENT PROCESS. MAX SLOPE ON SITE IS I IN lee OR APPRoxI% AIRRom wDir-ATE DIRECrION OF SLOPE. NO SIGNIFICANT CORADING REOV. • EXCESS FILL 18 TO BE FREMOYED FROM SITE. • DOWNSPOUTS ARE TO POSITIYE DRAW INTO PLAT STORM DRAW LNES. • DRIVEWAY WAS A I FJSE IN 32 RLIN OR 3% SLOPE. • NO DIRT, MUD, ROCK OR DEBRIS 514ALL BE TRACKED FRCM TWE SITE TO TWE STREET • DIRECT ALL RIJNOW TO FILTER FAEFJC FENCE DURINGs CONSTRIJCTION • ALL DOWN SPOUTS To BE TW4T-LINEO W/ SOLID 41 PIPE OF APPROVED MATERIAL TO CATC14 BASIN THEN DRYWELL TO T14E STOR1 STUB PROVIDED * FRONT OF LOT ALL STOR1 WATER TO BE RXTED TO EXISITINGs STOF;" SYSTEM LINE LOCATED ON MT14 FL W. • BENC444W N" ON FIFE WYDRANT TOP/W *TRACT IF' ELEV 33UVI 10011 ri 7'( TITLE: BURNSTEAD CONSTRUCTION LLC N DATE: 03/16/15 ERR 11980 N.E. 24th ST. I WOOI)VALE LOT 4 BELLEVUE, WA 98005 23602 105TH FL �EF -SCALE: I"=20' (425) 454-1900 Parcel xxxxxx HEIGHT CALCULATIONS RESUB ,4=325' Zone 5=32(5' Corner Fla1_10 MAR 2 0 2015 C, = 32a' Letbacks = 320' Front 4d Actual BUILDING DEPARTMENT CITY OF eDMONDS Sides AVERAGE GRADE=325' Rear ACTUAL RIDGE HT=352.43'othel. EET FILE MAXIMUM RIDGE 1-4T= 353'112&